Loading...
HomeMy WebLinkAbout3955 Marshall StreetINSPECTION RECORD Inspection onlin orm: http://www.ci.wheatridge.co.us/inspection tnspection Cancellation must be submit the online form° he project site Inspections will not be performed unfess this ca posted tion the following business day Request an inspection before MIDNIGHT (11:59 PM) to receive an inspecN - ' JOB CODE: PERMIT: ADDRESS: , ? `, S `'� ,� ` : 4,L"( � Inspector Foundation Inspections Date Initials 102 Caissons / Piers 103 Footing / P.E. Letter 104 Foundation Setback Cert. 105 Stem Walls 106 Foundation wall Insulation Do Not Pour Concrete Prior To Approval Of The Above Inspections Inspector Underground I Slab Inspections Date Initials Comments Comments 201 Electrical I Cable/ Conduit 202 Sewer Underground Int. 203 Sewer Underground Ext. 204 Plumbing Underground Int. 205 Plumbing Underground Ext. 206 Water Underground roval Of The Above Inspections Do Not Cover Underground or Below I In -Slab Work Prior To App Rough Inspection 301 Rough Framing 302 Wall Sheathing 303 Roof Sheathing 304 Sheer Inspectie 306 Mid -Roof ucco 308 Rough Electrical Residential 309 Rough Electrical Commercial 310 Electrical Meter Residential 311 Electrical Meter Commercial 312 Temp. Const. Meter 313 Rough Plumbing Residential 314 Rough Plumbing Commercial 315 Shower Pan I Inspector Date Initials Comments SEE OVER FOR ADDITIONAL INSPECTIONS M Y PERMIT: ADDRESS: JOB CODE: G Rou h I g nspection - (continued) 316 Rough Mechanical Residential 317 Rough Mechanical Commercial 318 Boiler/ Furnace 319 Hot water tank 320 Drywall screw and Nail 321 Moisture board / shower walls 322 Rough Grading 323 Miscellaneous Final Inspections 402 Gas Meter Release 403 Final Electrical Residential 404 Final Electrical Commercial 405 Final Mechanical Residential 406 Final Mechanical Commercial 407 Final Plumbing Residential 408 Final Plumbing Commercial 409 Final Roof 410 Final Window/Door 411 Landscape/Park/Planning' 412 Row/Drainage/Public Works** 413 Flood plain Inspection** 414 Fire Insp. / Fire Protection*** 415 Public Works Final** 416 Storm Water Mgmt.** 417 Zoning Final Inspection* 418 Building Final Inspection Date Date Inspector Initials Inspector Initials Comments Comments Inspections from these entities shall be requested one week in advance. *For landscaping and parking inspections please call 303-235-2846 **For ROW and drainage inspections please call 303-235-2861 'For fire inspections please contact the Fire Protection District for your project. Note: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not constitute authorization of occupancy. of For Low Voltage permits please be sure that rough inspections are completed by the Fire D Electrical low voltage by the Building Division. District and i CITY OF WHEAT RIDGE 1�9�Building Inspection Division (303) 234-5933 Inspection line 1(303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 4-- Job Address: 5 Permit Number: sic:)k1 0 bg k9 ❑ No one available for inspection- Time M Re -Inspection required: Yes No When corrections have been made, call f r re -inspection at -303-234- i 3 -234 - Date: /2- 4/Inspector: DO NOT REMOVE THIS NOTICE 1* � 4 i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 1069 (41 D Job Address: 9L3- �� A t--1— '57, Permit Number: 2D 1-)() 41 ❑ No one available for inspectio : Time OM/M Re -Inspection required: Ye No When corrections have been made, call for re-inspe ion at 303-23 933 Date: I I 2 2 1 ?- Inspector: �t DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Buildirg Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: -3 0 & - fil , Job Address: 3qs7s- %Y`)�, r,- T, t,4- Permit Number: -D 0 1-7 ®mss C7 i 9 ,d - Rooms 4)C-� J �3 V O ct c r rS-2 ❑ No one available for inspection: Time AM Re -Inspection required: Q No When corrections have been made, call for re -inspection at 303-234-5933 Date: 1 i 14-7 Inspector —T -D DO NOT REMOVE THIS NOTICE City of Wheat Ridge Residential Roofing PERMIT - 201708919 PERMIT NO: 201708919 ISSUED: 11/07/2017 JOB ADDRESS: 3955 Marshall ST EXPIRES: 11/07/2018 JOB DESCRIPTION: Permit for reroof: Install 32 squares asphalt laminate shingles GAF Timberline. *** CONTACTS *** OWNER (720)579-5194 MILOW BRADLEY B SUB (303)422-2725 Gary Theriaque 021170 Bear Brothers Roofing *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 8,000.00 FEES Total Valuation 0.00 Use Tax 168.00 Permit Fee 172.60 ** TOTAL ** 340.60 *** COMMENTS *** *** CONDITIONS *** Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be required for both the midroof and final inspections. The 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec. R806. The installation of ridge venting requires the installation or existence of soffit venting. For calculation purposes, one hat or turtle vent equal to one-half of one square foot of opening. Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201708919 PERMIT NO: 201708919 ISSUED: 11/07/2017 JOB ADDRESS: 3955 Marshall ST EXPIRES: 11/07/2018 JOB DESCRIPTION: Permit for reroof: Install 32 squares asphalt laminate shingles GAF Timberline. I, by my signature, do hereby attest that the work to be performed shall comply with all accompanyingg approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this ermrt. I further attest that I am le ally authorized to include al entities named within this document as parties to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, po plans and procedures. 2, This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing, and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and�procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4, No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. (. The issua a or ranting of a e it shall n t be construed to be a permit for, or an approval of, any violation of any provision of any applic*le X§Wman r &1ht>JFn of this jurisdiction. Approval of work is subject to Yield inspection. Chief Building Offlb'idl Date rST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Antoinette Kulick Z -o n 0891` From: no-reply@ci.wheatridge.co.us Sent: Tuesday, November 7, 2017 9:22 AM To: CommDev Permits Subject: Online Form Submittal: Residential Roofing Permit Application Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE ,� AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number (enter WITH dashes, eg 303-123-4567) Property Owner Email Address 3955 Marshall St. Brad Milow 720-579-5194 Field not completed. W/3110. (oma Do you have a signed Yes contract to reroof this property? Applications cannot be submitted without an executed contract attached below. Attach Copy of Executed Brad Milow Contract.pdf Contract CONTRACTOR INFORMATION Contractor Business Name Contractor's License Number (This is a 5 or 6 digit number for the City of Wheat Ridge) Contractor Phone Number (enter WITH dashes, eg 303-123-4567) Contractor Address (Primary address of your business) Bear Brothers Roofing 021170 303-422-2725 7245 Gilpin Way #280 Denver, CO 80229 Contractor Email Address ap@bearbrothersroofing.com Retype Contractor Email ap@bearbrothersroofing.com Address DESCRIPTION OF WORK TOTAL SQUARES of the entire scope of work: Project Value (contract value or cost of ALL materials and labor) Are you re -decking the roof? Is the permit for a flat roof, pitched roof, or both? (check all that apply) 32 No Pitched roof (2:12 pitch or greater) N What is the specific pitch of the PITCHED roof? How many squares are part of the PITCHED roof? Describe the roofing materials for the PITCHED roof: Type of material for the PITCHED roof: Provide any additional detail here on the description of work. (Is this for a house or garage? Etc) 4 32 Laminate Shingles - GAF Timberline Asphalt House SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work may not begin on this property until a permit has been issued and posted on the property. I certify that I have been authorized by the legal owner of the property to submit this application Yes Yes Yes Yes 3 and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Name of Applicant Lauren Wright Email not displaying correctly? View it in your browser. F107"it - 7 k�VU�n �Zf k lei ZA""Ply "We. 7246 Gilpin Way Unit 280 Denver, CO 80229 303-422-2725 Fax 303-274-2151 I . SCOPE OF VVORK — ROOF Bear Brothers Roofing, LLC shall furnish all labor and equipment required completing the following 'Schedule of Work.' The Home Owner is responsible for furnishing all materials needed to replace the roof to comply with the Wheat Ridge city building code. 2. SCHEDULE OF WORK 2-1 Apply for building permil: 2-2 Tear off old roofing system down to the decking and haul away. 23 Call in mkktet f inspection 2A Install new roof per Wheat Ridge building code IS Remove all trash pertaining to the project from the property, ze Call in final inzVection. Home owner must provide and set up tha ladder for the final cdy inspeclion. Bear Brothers will notify the homeowner of the trispection date. 3. GENERAL REQUIREMENTS 3.1 Clean up all debris from the site. 3.2 Project to start Wthin 2 weeks from the date the permit gets approved and be completed within 2 days of start dale or sooner weather perm". 31 Custonw has the right to cancel this conbract with full mfund wlthin ow &at 72 twurs of slank*. 4. WORKMANSHIP 4.1 Bear Brothers Rooling, LLC shall complete Vve project in a vAxkman like manner. 4.2 Bear Brothers Roofing, LLC shag make every effort to proled the property dunng the wo(kprocess, 5. GUARANTEE 5.1 Bear Brothers Roo", s: all work to be perliormed in accordance with the Manul.rt urefe requirements and/or specifications. 52 Guarantee shall be as killows Sow Snoithem Two Yew Workinanship Wananty 613 Guarantee shall commence upon receipt of payment in full, effectim as of date of oomplebort of project 6. FINAL Scanned by CamScanner Otto ber27,20i7 7. PAYMENT TERMS 7.1 Paynient shaft be due as follows: Payment due In fuff on the day the rcof is irmUlled and campA S. GENERAL CONDITIONS 8.1 This Contract shall become binding only upon witen acceptance hereof by CoritrWor or an authorized Agent of the Contractor or upai commencement of Work. 8.2 This Cont -ad consl�itutes the entire understanding of the parties and no understanding, collateral or otherwise, shall be binding unless in writing and signed' both pattes- U Bear Brotheis Roofing cannot pay for or cover any insurartce deductibles - 8 -3.1 Replacement of rotten and/or deteriorated fascia boards, shingle mold, ventlato siding or other materials, unless otherwise stated in this sr-acL am not included the total cost and vAll be charged additionaNy on time andmaterial basis. 8.5 Any representation or other communication, not writtw in this Contract; is agreed be immaterial and not to be relied upon by either party, and do not survive exocuton of this Contract 9.6 Bear Brotiters PoofirQ, LLC wo*:men shall have access to all building water and 11 vok e4ecbicity du mig the entire wo* projecL 8.7 Owner vAll provide access to gates and the perimeter of all buildings on the propeq frx sbddng delivery of matEnial. 8.8 Bear Brothers Rooling, LLC vAll not be held liable for any interior damage incu during the roofing process. Or damage to driveway-. or vialkways arid mechan-, unts or air cononers, spas, etc. during the project White we exercise the up m care and use current industry piactices, the re -roofing process is inhermently and potentially damaging to ft already compromised existing roof systern- The reafing primess urjude-s increased roof top traffic and loads, which can damage systems- Therefore we cannot be responsible for the watertight performance of existing noofing systems during the m400ling pmcesss- 8.9 A SMIME CHARGE(administration fee of 21% per month vAll be charged on overdue a=unts, which shall be defined as all aocounts remaining unpaid afthea-r th due date, unless othenMse specified. In the event Sellers drects the use of leg remedles to colled payment the Buyers agrees to pay to Sellers all costsrf a*enses, including legal fees, hourTed in the course of collection or pendency of th action. ACCEPTED BY; z =- P C) -_ � Data • kip Building Permit Application (Complete a highlighted areas) 3 2 (please print): AW Date: Plan # Permit # L__ U Phone: , 19V 3 Address: Ifllfl? 6 MRSOM= W= Electrical: Plumbing: City License # City License # City License #