HomeMy WebLinkAbout3215 Iris CourtFrom: no-reolvCalci.wheatridae.co.us
To: CommDev Permits
Subject: Online Form Submittal: PERMIT APPLICATION Water Heater Replacement
Date: Friday, January 28, 2022 10:14:12 AM
CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe. Report any suspicious activities to the IT Division.
PERMIT APPLICATION Water Heater Replacement
This application is exclusively for RESIDENTIAL REPLACEMENT WATER
HEATERS - LIKE FOR LIKE ONLY.
YOU MUST ATTACH A VALID CREDIT CARD AUTHORIZATION FORM IN
ORDER FOR THE PERMIT TO BE PROCESSED.
Your Permit will be emailed to the email address provided below once it is
processed.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
WORK UNTIL PERMIT HAS BEEN ISSUED.
Do Not use this form if the Water Heater is changing locations or if this is a
conversion to a Tankless Water Heater. Please use the General Permit
Application for a more comprehensive review.
Is this application for a Yes
replacement water
heater like for like?
PROPERTY INFORMATION
Property Address 3215 Iris Court, Wheat Ridge, CO 80033
Property Owner Name Carl & Susan Dahl
Property Owner Phone
Number (enter WITH
dashes, eg 303-123-
4567)
Property Owner Email
Address (Leave blank if
not known)
Attach City of Wheat
Ridge Electronic
Payment Form - "DO
NOT ATTACH A
303-526-1739
permits@applewoodfixit.com
PICTURE OF A
CREDIT CARD"
CONTRACTOR INFORMATION
Contractor Business
Applewood Plumbing, Heating & Electric
Name
Contractor's License
18236
Number (This is a 5 or
6 digit number for the
City of Wheat Ridge)
Contractor Phone
303-458-5988
Number (enter WITH
dashes, eg 303-123-
4567)
Contractor Email
permits@applewoodfixit.com
Address
Retype Contractor
permits@applewoodfixit.com
Email Address
DESCRIPTION OF WORK
Number of gallons
75
Is the water heater
GAS
GAS or ELECTRIC?
If GAS, enter # of
80
BTUs. If electric, enter
n/a
Where is the water basement
heater located (for
example, basement,
crawlspace, etc)?
Project Value (contract 14079.00
value or cost of ALL
materials and labor)
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of
Wheat Ridge codes
and ordinances for
work under any permit
issued based on this
application.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have Yes
been authorized by the
legal owner of the
property to submit this
application and to
perform the work
described above.
I attest that everything Yes
stated in this
application is true and
correct and that
falsifying information in
this application is an
act of fraud and may
be punishable by fine,
imprisonment, or both.
Person Applying for Tracey L Johnson
Pe rm it
Email not displaying correctly? View it in your browser.
INSPECTION RECORD
Inspection online form: http://www.cl.wheatridge.co.us/inspection
Cancellations must be submitted via the online form before 8 a.m. the day of the inspection
Inspections will not be performed unless this card is posted on the project site
Request an inspection before MIDNIGHT (11:59 PM) to receive an inspection the following business day
PERMIT:,;�,p]-pCJj ��Z ADDRESS: �����r; s JOB CODE: ���
Foundation Inspections
Date
Inspector
Initials
Comments
102 Caissons / Piers
103 Footing / P.E. Letter
104 Foundation Setback Cert.
105 Stem Walls
106 Foundation wall Insulation
Do Not Pour Concrete Prior To Approval Of The Above Inspections
Underground / Slab Inspections
Date
Inspector
Initials
Comments
201 Electrical / Cable/ Conduit
202 Sewer Underground Int.
203 Sewer Underground Ext.
204 Plumbing Underground Int.
205 Plumbing Underground Ext.
206 Water Underground
Do Not Cover Underground or Below / In -Slab Work Prior To Approval Of The Above Inspections
Rough Inspection
Date
Inspector
Initials
Comments
301 Rough Framing
302 Wall Sheathing
303 Roof Sheathing
304 Sheer Inspection
305 Insulation
306 Mid -Roof
307 Metal / Lath / Stucco
308 Rough Electrical Residential
309 Rough Electrical Commercial
310 Electrical Meter Residential
311 Electrical Meter Commercial
312 Temp. Const. Meter
313 Rough Plumbing Residential
314 Rough Plumbing Commercial
315 Shower Pan
SEE OVER FOR ADDITIONAL INSPECTIONS
c
PERMIT: ,2p f ADDRESS: 32L- - r'JOB CODE:
Rough Inspection (continued)
Date
Inspector
Initials
Comments
316 Rough Mechanical Residential
317 Rough Mechanical Commercial
318 Boiler / Furnace
319 Hot water tank
320 Drywall screw and Nail
321 Moisture board / shower walls
322 Rough Grading
323 Miscellaneous
Final Inspections
Date
Inspector
Initials
Comments
401 Gasline
402 Gas Meter Release
403 Final Electrical Residential
404 Final Electrical Commercial
405 Final Mechanical Residential
406 Final Mechanical Commercial
407 Final Plumbing Residential
4 TrfaTPTiim'bi Commercial
409 Final Roof
i Tndow/Door
411 Landscape/Park/Planning*
Inspections from these entities shall be requested
one week in advance.
*For landscaping and parking inspections please
call 303-235-2846
**For ROW and drainage inspections please call
303-235-2861
***For fire inspections please contact the Fire
Protection District for your project.
412 Row/Drainage/Public Works**
413 Flood plain Inspection**
414 Fire Insp. / Fire Protection***
415 Public Works Final**
416 Storm Water Mgmt.**
417 Zoning Final Inspection*
418 Building Final Inspection
Note: All items must be completed and approved by Planning, Public Works, Fire and Building
before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not
constitute authorization of occupancy.
For Low Voltage permits please be sure that rough inspections are completed by the Fire District and
Electrical low voltage by the Building Division.
Page 1 of 2
The City of Wheat Ridge
Third Party Form Check List
Property Address �� _
Permit Number l"D4 J Z
Permit Issued Date :;2— 2_1 ?�--
Owner Information ��L �,
Property Owner Information
Property Owner Address Ce- 1
Insoector Information
Inspection Company
Inspector Dame Gary Manlove
Ins ector Contact infoJBA, °Oaox28.
P � ��� �a.�puF.�c®�1,8
Cell ?2D 443.8280
Email.- gary maniose�mail com
Insvector Statement and Acknowledgement
nearby acknowledge the roof I am inspecting is 6112 or over. All roofs
that are under 6112 must be inspected by the City of Wheat Ridge Buiding Dept.
I hearty acknowledge the roofing system for the referenced building has been inspected
and found to be in compliance with the minimum requirements of the 20 -and. 0112
IBC as well as a!I of Wnd spheat Ridg Policies and Procedure lanufacturer's
recommendation ecif
Inspector: Date:
Property Owner Statement of Acknowledcement
*I hearby acknowledge that I am the owner of the building referenced above and
r y consent for the listed third -party inspection company to perform my roof inspection
in lieu of the City of Wheat Ri e Building Dive - n inspection. �>
Propery Owner/Agent: Date: C?
This original document and permit card, as well as the roofing check list, must be submitted tc
the Chief Building Officialwithin seven days of the final inspection.
Drop off in person
Permit counter 2nd floor
7500 W. 29th Ave
Wheat Ridge CO 80033
Draft Date: 7126/17
The City of I . 9
Inspe n Checklist N
MID -ROOF
C�Page 2 of 2
The City of Wheat Ridge
Inspection Checklist Notes
FINAL
F -I WA EI r Metal roof shingles shall not be installed on slope less
3-12
El Fay Metal valley flashing shall be the same material as roof
L-1 rdii Metal valley flashing shall extend a min of 8" from the
dil
centerline with a min- of 314 " high splash diverter
rib buift-in at the flow, line with sections overlapping a
a min_ of 4"
Roofs Re uirements
LA
�d concrete tile shall have a min. 2-1.1'2,12 slope
WA Slopes 4:12 and under require double underlayment
Company Name: JBA CONSULTI
Inspector Signature:
Date of MID -ROOF Inspection:
Company Name: JBA;SULT
Inspector Signature:
lory
A
Date of FINAL Inspection:
Roof Insvection
E4.. Fall
Ljrfir
E
Ej Fail
Structural roof components
1e10 A
FW--, vi.
F71 Fail
L.J r.ii
Verify that no more than 2 layers of shingles exist
Flashing for roof and walls
ass
El Fail
If new sheathing is installed verify that it is listed in the
permit description (Valuation must be adjusted)
El pams
0 Fail
Verify sheathing nail pattern (See Policy & Procedures)
171 tVA
Lj Fail
Crickets and saddles where needed
1771 tvA
E211-0,
171 Fail
Verify B vent must have boot same gauge as pipe
E-] UJA
0 r -ail
Verify vent caps
MIA
P
El Fail
Verify no flashings are damaged or rusted
U,,,'A
El Fail
Step flashing shall be min. of 4x4 piece per shingle
�wl
El Fail
Verify scuppers allow for proper drainage
LA tvA'C
El Fail
Ice and water shield 2' in heated wall spaces
El N!A
;Ilp mv.
0 Fall
Undedayments must follow 2012 [RC 12012 IBC,
E] U'A
Vi-_
E-1 Fail
Verify roof slope for proper drainage Z__
NjA
-1"<
Li ra
Dripedge shall have min of 2" overlap
K;A
P Ks
E Fail
Dripedge should extend crown min 2" past roof deck
E] K�
Vi-.
E] Fail
Ddpedge shall be mechanicaly fastened 12" OC
Co .;,a
17i Pas%
- Fail
90 LB roll roofing shall not be applied to roof slopes
less than 2:12 slope: Exception, detached garages,
pabos, carports. open on three sides vMh min. slope of
1:12
Fpas-.
171 raii
Modified Bitumen, EPDM, TPO min slope 11'4:12 slope
Ea!rA
E pav,
Ll Fail
Above: roof insulation R-25
El Fail
Bellow roof residential R-38
0 Fail
Bialroxv roof commercial R-32
-1 Fail
Modified Bitumen, EPDM, TECH min slope 1f4:12 slope
must be installed in accordance vMh the manufacturers
specifications- Must have manufactures letter of
warranty vAlh the address on the letter for final inspection
F -I WA EI r Metal roof shingles shall not be installed on slope less
3-12
El Fay Metal valley flashing shall be the same material as roof
L-1 rdii Metal valley flashing shall extend a min of 8" from the
dil
centerline with a min- of 314 " high splash diverter
rib buift-in at the flow, line with sections overlapping a
a min_ of 4"
Roofs Re uirements
LA
�d concrete tile shall have a min. 2-1.1'2,12 slope
WA Slopes 4:12 and under require double underlayment
Company Name: JBA CONSULTI
Inspector Signature:
Date of MID -ROOF Inspection:
Company Name: JBA;SULT
Inspector Signature:
lory
A
Date of FINAL Inspection:
City of Wheat Ridge
Residential Roofing PERMIT - 201704552
PERMIT NO: 201704552 ISSUED: 07/21/2017
JOB ADDRESS: 3215 Iris CT EXPIRES: 07/21/2018
JOB DESCRIPTION: Residential Re -roof to install Certainteeed Presidential Shake shingles
with 31sq.
House
*** CONTACTS ***
OWNER (130)641-9063 DAHL BOB
SUB (303)466-7386 Bob Bellitt 018626 Arapahoe Roofing & S/M
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 22,322.00
FEES
Total Valuation 0.00
Use Tax 468.76
Permit Fee 410.35'
** TOTAL ** 879.11
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) requires an approved inspection
prior to installation of ANY roof coverings and is require on the entire roof when spaced
or board sheathing with ANY gap exceeding one half inch exists. Asphalt shingles are
required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and
water shield is required. Eave and rake metal is required. A ladder extending 3 feet above
the roof eave and secured in place is required to be provided for all roof inspections.
Roof ventilation is required to comply with applicable codes and/or manufacturer
installation instructions, whichever is more stringent. In order to pass a final inspection
of elastomeric or similar type roof coverings, a letter of inspection and approval from the
manufacturer technical representative stating that "the application of the roof at (project
address) has been applied in accordance with the installation instruction for (roof
material brand name) roof covering" is required to be on site at the time of final
inspection.
Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd
party inspection report will be collected at final roof inspection performed by City of
Wheat Ridge. If report is not available the final inspection will not be completed.
City of Wheat Ridge
10,
Residential Roofing PERMIT - 201704552
PERMIT NO: 201704552 ISSUED: 07/21/2017
JOB ADDRESS: 3215 Iris CT EXPIRES: 07/21/2018
JOB DESCRIPTION: Residential Re -roof to install Certainteeed Presidential Shake shingles
with 31sq.
House
I, by my is
do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this ermit. I further att t that I am le ally authorized to include all entities named within this document as parties to the work to be
per
and that all w rk to b rformed is disclosed in this document a�/or it ' accompanying approved plans and specifications.�-
Signature of OWNED or COLOR (Circle one) Date
I. This permit was issued based on the information provided in the permit application and accompanying )tans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Offipial and is not guaranteed.
4_ No work of an manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or graniiri ' f a permit shall not be construed to be a permit for or an approval of, any violation of any provision of any
applicable code or an nce ori ono tb�i 'urisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Dan Schultz
From: no-reply@ci.wheatridge.co.us
Sent: Wednesday, July 12, 2017 7:59 AM
To: Permits CommDev
Subject: Online Form Submittal: Residential Roofing Permit Application
Categories: Gina
Residential Roofing Permit Application
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
your contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a Yes
residential roof?
How many dwelling units Single Family Home
are on the property?
PROPERTY INFORMATION
Property Address
Property Owner Name
Property Owner Phone
Number
3215 IRIS COURT
BOB DAHL
130-641-9063
Property Owner Email CROBDAHL@AOL.COM f
Address ( r ' ( (
Do you have a signed
Yes
contract to reroof this
property?
It will need to be
provided at the time of
permit pick-up.
CONTRACTOR INFORMATION
Contractor Name
Arapahoe Roofing and Sheet Metal, Inc.
Contractor's License
018626
Number (for the City of
Wheat Ridge)
Contractor Phone
3034667386
Number
Contractor Email Address
CAMI@ARAPAHOEROOFING.COM
Retype Contractor Email
CAMI@ARAPAHOEROOFING.COM
Address
DESCRIPTION OF WORK
Are you re -decking the
No
roof?
Description of Roofing
CERTAINTEED PRESIDENTIAL SHAKE
Material
Select Type of Material:
Asphalt
If "Other" is selected
Field not completed.
above, describe here:
How many squares of the
31
material selected above?
Does any portion of the
No
property include a flat
roof?
If yes, how many squares
Field not completed.
on the flat roof?
TOTAL SQUARES of all
31
roofing material for this
project
Provide additional detail
House
here on the description of
2
work. (Is this for a house
or garage? What is the
roof pitch? Etc)
Project Value (contract 22322.00
value or cost of ALL
materials and labor)
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this Yes
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
Name of Applicant arapahoe roofing
Email not displaying correctly? View it in your browser.
3
06124/2017 20:09 3035261739 C.R.DAHL SUSAN DAHL PAGE 02:''03
ARAPAH E
ROOFING & SKEET METAL, INC.
1504 South Arthur Avenue
Louisville, CO 80027
Ph. (303) 466-7386 l=ax (3031466-7386
www,arepahootoofing.com
Jane 16, 2017
Bob Dahl
3215 Iris Ct.
Wheat Ridge, CO. 8€1033
!near Sir:
Arapahoe Roofing and Sheet Imetal, Inc, has em
following options for your review and considers
Remove the existing shingles to the roof dec
➢ Install Ice and Water Shield on all eaves per
Install new 30# UL approved base felt.
);- Install pre -finished metal in all valleys per Ic
➢ Install all necessary roof related metal flashi.
specifications.
➢ Install new pipe flashings and roof vents.
➢ Install new Certainteed Presidential Shalee G
building codes.
TOTAL SHINGLE. PRICE: $22,322.00
The following items are included in this prop
1, All material required to do a complete job.
2. All labor to perforin the work clone by Arapt
3. Removal of all trash and debris created by o
4. All necessary building permits and inspectio
5. All necessary licenses, taxes and insurance.
6. Two year warranty on materials and workma
I, th roof at the above',address and p
bui ding codes.
per
work.
codes,
ll building codes and manufactu
starter strip and hip &
employees (no
s pe
)�es the
06/'24112017 20:09 3035261739 C.P.DAHL SUSAN DAHL PAGE 031'03
Page Two
Jane 16, 2017
Dahl -- 3215 Iris Ct.
This price is good for 30 days.
If this proposal is acceptable to you, please si
If you have any further questions, please cont
CoIV
�rucbvely yours,
-- �s
Jtirerp Y
Estimator / Project Manager
I wish to schedule the above work and agree 1
his letter and xPhrn i1 4n rrc
I
us at 30-466,
terms find c
Landscape Escrow A~reement
.l..~~ WHE~t 1'..-
" cJ
- C>
u '"
cOLORf'"P
City of Wheat Ridge Planning and Development
Department
This agreement made this ~ day ~f ~v.--e , 20 i1J"by and between the City of
Wheat Ridge and ~ h (. <' () (G-; v - yt4~lactor/developer/owner).
. \ \ l YCL'
Escrow III the amount of -+"1 r-E:( ~ VI iA ,} ,'eLf ~--<..- q /I D~ --- DOLLARS
($~OC' eo ) is being hetd until all landscaping improvements are completed at,
'{l~,--,-- ~4~~--'--- r I/'~l ~--
3z..lS- ~~? Cf--
In the event that landscaping required by Wheat Ridge Code of Laws, Section 26-502
and/or as shown on an approved landscape plan is not installed
by ~ {3 O'U-1Q Y ,(date) the City of Wheat Ridge or its designee shall
have e right to enter upon said property to construct and/or install such improvements
or do other such work to accomplish that purpose as may be necessary, provided that the
City of Wheat Ridge shall first give notice in writing to the contractor, developer or
owner of its intent to do so.
If the City of Wheat Ridge exercises its right to perform work of any nature, including
labor, materials and use of equipment either by force account or contract, the City shall
have the absolute right to withdraw the escrow funds to complete said landscape
improvements. The only precondition to the City's right to withdraw the escrow funds
for this purpose shall be a letter from the Planning and Development Director, stating that
the l~dscape impr~ents have not been ~omplete~ or provided and that the
compliance date of L-- d'f: -3 () 22) c ~-has expued.
,
/
Approved and Agreed:
--
It} f-I t-R
..co~)'
C7 Cf-()/f
Date
Business Address ~
"Ai2vt x-F'
Title
City of Wheat Ridge. Colorado
By: ~_6~'--- I~
/ (' ~ 0 P /?~
Title: ,~ r~
Date: r'-.Q. 9 CZ-(jCJ;5
I
ilJ"-'i-" t,,!!,-- ..,.----....--~..-., .-...;.,~''''. ,..-_"":'I~".,.,...'~..':"\lI!""'" ""'"""'~"..,~';"'-'~-'. .'-F """"'~"'~"'~.'l"
""-,=:.,,. '17. ~'T ~"""""'.J""Ifl.;c;...:.',.-'~'""!I!:-",,
;t:..""....N.""...~ _..~-'""I'f.
B
Elevator/Escalator Safety Inspection Program
Date I
(j'>'
,
(,
tly
Correction Notice
I",^
L-",
,) l.'
[..
To view details of this correction notice go to
htto://www.drcoa.ora/elevatororogram/correctionnotices/
and enter the following code:
"
.] f ,-- J
'-oJ 2. ,(. 1/--- ,
, I.
I. i
t._''-'' t..,
j
ti/" 'I -"" (,.
,'? j'1
Notes:
/1(" 'i /
I
( ~.., /
/.1- 2
r ;0
-r J,
/~/ ./
-t4
J.)
,) ./ .
1/1 f
. v (
~ -
I
, '
_..-J
-r"
Bill Gardner
Elevator Inspector
! -~ 'J"f" " " -r
V .
I.
j)
(' -,
I
,-;)
I
'.J
LJ\
, )
,
I
.f '.
...?" ~ '
I {
,'I
'-'
J. l_
/
Tel: 303480-6730
1290 Broadway
Suite 700
Denver CO 80203-5606
CelllVoicemail: 303-888-7693
Fax: 303-480-6790
E~ail: bgardne<@drcog.Of!l
Web: WWN.drcog.org
,v
I
I
\i,
I
1.1.
't~
Va 017
"13.
BUILDING
--~~-------------
ADRE",:'3
'J 2. n- / Y I ~ C ,.
-----------rr--:;t;- c u
__W~..L--h=.L~-#,
SUBJECT
RESIDENTIAL ELEVATORS
TOPIC
CODE REQUIREMENTS
HOISTWAY SOLIDLY ENCLOSED THROUGHOUT ITS HEIGHT. ~)f
RULE 100.1b ALLOWS LAMINATED GLAss.
TOP CAR CLEARANCE SHALL BE NOT LESS THAN 6 IN. PLUS 1 LJ~
IN. FDR EACH 3-]/3 FT/MIN IN EXCESS OF 30 FPM.
HoISTWAY DOOR'::' '3HALL BE SOLID SWINGING ~R ",'LIDING DOORS. of
HoISTWAY DOOR TO HOISTWAY SILL SHALL NOT EXCEED 3 IN. !(
DISTANCE BETWEEN HOISTWAY DOOR AND CAR ODOR SHALL NOT 0
EXCEED 5 IN.
HOISTWAY DOOR UNLOCKING DEVICES SHALL BE PROVIDED FO.!3 ALLO/,!
DOORS., VI
6. PIPES CON',jEYING STEAM, GAS OR LIQUID '3HALL NOT BE ,rJjl
INSTALLED IN HoISTWAY. ~
1.
2'.
..:0.
4.
5
7.
HOfUZoNTAL CAR CLEARANCES SHALL NOT BE LE",'S THAN 3/4 INQ'./'
8ETWEEr~ CAR AND HoI::::TWAY ENCLOSURE. f""1
8.
CLEAf~ANCE BETWEEN CAR ::::ILL At~D LANDING ,:::ILL '::'HALL NOT BE {)J)1
LESS THAN 1/2 IN. NOR MORE THAN 1-]/2 IN. I !
GLAS",' IN CAR'::: GREATER THAN 1 S(~. FT. SHALL BE LAMINATEDP,4--
CAR DOOR OR GATE '3HALL BE MIN. 66 IN. HIGH AND RE.JECT A all
BALL 3 IN. IN DIAMETER_ ~
CAR LIGHT SHALL BE PROVIDED AND EMIT MIN. 5 FTC. LIGHT~~
IF THE DRIVING MACHINE IS WINDING DRUM OR SPROCKET AND O/-f
CHAIN SU::::PEN""ION TYPE A FINAL TERMINAL STOPPING 'DEVICE 1'(
OPERATED BY THE MACHINE SHALL BE PROVIDED.
UPPER AND LOWER FINAL TERMINAL STOPPING DEVICES OPERATED (J,;,/
BY THE CAR TO REt10VE POWER FROM THE MOTOR AND THE BRAKE /I(
SHALL BE PROVIDED.
n
='.
10.
1] .
1.";;
~.
14.
A TELEPHONE SHALL BE INSTALLED IN THE CAR.
BELL :::'HALL BE INSTALLED. ~. -',
MAX. LOAD, ~ MAX. SPEED, 40FPM;) MAX
50 FEET. t;J'O ~
AN ALARM
OJ/f
15.
TRAVEL,
'] k~/
16.
CAPACITY PLATE :=;HALL BE PLACED INSIDE THE CAR. DATA all
PLATE HHALL BE FURNISHED IN THE MACHIt~ERY HPACE AND t/' ~
INDICATE :=:PEED, :3USPEN:=:ION MEANS, MANUFACTURER AND DATE
OF INSTALLATION.
17.
CARS RATED 500 LBS. OR LESS AND SPEED 30FPM OR LESS K
SUSPENS I ON ROPES SHALL BE NOT LESS THAN 1 /4 INCHES. Q {
WHEN RATED LOAD EXCEEDS 500 LB~. D SPEED EX. EDS 30FPM "-
THE ROPES SHALL NOT BE LESS AN 3/8 INCHES.
A PRESSURE SWIT~H SHALL BE PR.< DED TO ~~VE POWER FROM~~
Pl.Jt1P t10TOR AND CONTRDL VALVE, IF HYDRAULIC.
18.
-------------------------------------------------------------
-------------------------------------------------------------
-------------------------------------------------------------
------------------------------------------------------------
-------------------------------------------------------------
------------------------------------------------------------
SUBt1 I TTED TO:
tvl "",-jf?<I/~
-----------------------
----------G------------
DATE: ___~=~~L______
SUBMITTED 8Y:_~~~
.
Date:
roll%s
.4 Certificate of Occupancy or Completion has been requested for:
AoDlU:88: 3215 Iv-is Ct
PURP08r: or 5TRUCTURr:: ~ r K
Remarks:
Building Department Approval:
Zoning Approval: /Vi K .
c'--9 -025 /1..? {},jJ 8:50-0
~F S<~,
PublicWorksApproval:DF'"6. OIL wJL..~ :J;;:t/:J G./ct/08
oK- - /IJ~ /t- Ll:II~ p~Vr"bIN6s rr
Remarks: !>.-7'R. W~rY ~~ 71fG 2. SI"l>~t-</..-1LK-
Sn>I'JES ~ WElC-E. ~~46.s-6.
.( /J.-.;;,/".a j-<l_ ct-:',,~--n {of} c;..>>-TC~
iA.f~,A_
Remarks:
Fire Marshall Approval:
(If Applicable)
Remarks:
Sanitation District Approval:
(If Applicable)
Remarks:
Water District Approval:
(If Applicable)
Remarks:
INSPECTION RECORD
J -
I (. /
r: d -'
7500 W. 29th Avenue
Wheat Ridge, Colorado 80033
(303) 235-3855
crlnSRection Line (303) 2J4-5933
Inspections will not be made unless this card is posted on the building site
24 Hours notice required for inspections
Job Address
Building Penn it No. " ..
Owner I (
g::::~~~ AJd~~~S ~,to', i, ~ <'.,~ .
, I
,<", ~~.( .
Date Issued
Type Occupancy
INSPECTOR MUST SIGN ALL SPACES PERTAINING To THIS JOB
FOUNDATION INSPECTIONS DATE APPROVAl DISAPPROVAL INSPECTOR COMMENTS:
INmALS
Footings/Caissons
Stemwall
Reinforcing or Monolithic
Weatherproof / French Drain
Water/Sewer Service Lines "f IIJ/d) r /:lJ ;7
P6UR No CONCRETE UNTIL ABOVE HAS BEEN SIGNED
CONCRETE SLAB FLOOR
Bectrical (Underground)
Plumbing (Underground)
Heating (Underground)
Electrical Service
Rough EJectric
Rough Plumbing
Air Test Gas Piping
Rough Mechanical
Framing
Roofing
Insulation
Drywall Screw
Do NOT POUR FLOOR UNTIL ABOVE HAS BEE IGNED
/ i._
,k
ICL
/-L-
FINALS
Electrical
Plumbing
Mechanical
Frame /lnterior Finish.
R.OW & Drainage
Fire Department
Parking & Landscaping
**NOTE: ADDITIONAL INSPECTIONS / COMMENTS ON BACK
OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF
OCCUPANCY IS ISSUED
PROTECT THIS CARD FROM THE WEATHER
\-
I
i
,
Place in Visible
Location for Inspector
r-
ADDITIONAL COMMENTS & INSPECTIONS:
/
/,
) >, ..;"."i 'r ;"
")
"J ~'
/
'--
:. ,;,-I..,(],
/";fj.' ",,'4' r,"L /,,".5, ,),' , t. ~,. 0, n:. ,;; "( / f, >t of 7Tr ,=/.-/"". U>d!1 --<:>t/ /~<<;~',7 jC.C"
',.-rj>i ,./4,.17//:' :...;. ,fF p.'l-n... jV<.,,~E ''1/'l~/~r 4
I.,.'w~.,~ /'._7'-(. {,.,:'.,/(.", ;,~, __ /:,.'7. i"'7/_ _I .../~;I-.'C r!f'.J;{' Vl-c'lt' ...-I/<!E-''/ /1j;l'7/~'? Ki.
. -,f /-H I~"/!r. />:'AtI.:" -.; ,If.">:7:' ~ .--.../Ii:',....,j.~ /4,> ~- KC- 1~/lcfS' ~t? ~>~1L, '/'N:~:l"'f4
, < c'' f _ ~'<'. I f,' .../<:>l?
. /{.-rJL.'<f::.f{./;"//""U.? ~ r'
/.k1h r~,-T, .... <. .
, ',- _ //C _ //(" X/Y/$-S'
dll/~,r "
, .
-,
Lou Ficco
Page 1 of 1
From:
To:
Cc:
Sent:
Subject:
"Gene Beyers" <gene@beyerswindows.com>
<Iouficco@qwestoffice.net>
"Greg King" <greg@beyerswindows.com>
Wednesday, June 04, 2008 9:15 AM
Temp. glass at Iris Ct.
To: Mr. Lou Ficco
Lou Mar Construction Co
From: Mr. Gene Beyers
Beyers Window & Door, Inc.
7310 S. Alton Way. Ste H
Centennial, Co 80012
303-220-5990
To whom it may concern.
Please be advised per this letter by me that a new TEMPERED, INSULA TED GLASS
UNIT WITH LOW-E. Has been ordered. for the Master Bath window at 3215 Iris
Ct. Wheatridge, CO 80033. The new unit will be original Weather Shield
Glass with the "tempered glass bug on the glass" per building code.
It will be installed into the existing vinyl window frame as soon as it
arrives here in the Denver area, by Beyers Window and Door, Inc. To factory
specifications.
I apologize for any inconvenience.
Sincerely
Gene W. Beyers
Beyers Window & Door, Inc
6/5/2008
f-
a
:>
:>
""
N
"
>->-
>-Z
::::;w :>-
-::;; :>-
f-w N
=>(/) """
. <{ ~,
Ow "
OJ
o
o
N
"-
m
N
"-
U)
0'
~
-0
W
'"
~
V1
I
N
I
f-
a
-'
./
0'
~
-0
./
N
45.75
45.67
E
,'. [lJQ)lr ~ .' . '., ..' . ~, /. ;'43 '4
. ..:. :: ~...' 44:<4'. ". .,.." 4;1.8"4" 43.4-S~ .... .,. .....
_ ----=- T:;_~~,:~~,~_,~40 1C:....~.~.~.~..~~>_~~--. :_~_.~.~. .. . ....i.:'./;
89 36...W......'.1",S.Q.7. .....'.>...4..4.0"'.. .4.0
,. ." ."", ." ..' '.. . . . .., ...., '4 ., 6
44.74 ?~4.34 3 ~" 43.76 ','.. '
. "44 0
--=-45.57 x . '/:>0/- - ;9% ~!'. tt% - - l" 43.8/"
45.50 Y I
35.1' ~ "~5.44 ~ "44.90
:-" " 46.78
c.n.
'0
o
c:i
o
, . .
~
(J1
o
6.0' 47:65
--->. ';"" ~.'
;..j
I
...r
4:' 2
10' UTILITY
EASEMENT
......
..........
n'
g.';
g:'l;
~ :'(.
.~> .:.,\;
-:."'
. .
. :... , "~4'.
N
<D
2-STORY
BRICK HOUSE
;', f:
w 4;68
""" -
""":
", ..-. ~ '. ..:
~
b
o
z
.,. '. 48.11
~",.".'d"/y- f7.18
2.0' - ;V
30.21'
48. 8. I
<D
". ."
53.8' O~;; 44 l;;; 1
48.61 1.5% 48.86 ~8.6S... ,.;4 '0..... 48. 5> 47.80 . I
"49.13 .' . ~...... .:. 481 .
x . ~. .. :J!>. . ~ '" .
t ' ',.- '.' .': 'x 48 3~ . .'. 48. J 1
4871 '.' .0.8% '. x N" . .. '. " 1) 7.~ . .'.
L "" _ ~n ',:,~ ~~~~:!;': ~:'.:.~]f,:,'..A',".; ..... :
89'2936 W 125,04 48.76'" .
....
lOlr1 ~
"
4"15
'\;.
.' .";; 4.3'
3.5% 49.18
N
"
39.1'
48.01
L5' UTILITY
EASEMENT
SCALE 1"= 20'
~--------
20 0
V1
,
30
LEGEND
10
20
f-
a
-'
~ ~'.":'.:'/"<;<:1
;. I'--~'--...-....-.".'''.''I
(f) _...____-"____m_____n___'_"".....""'...'.n.._.._'_C____n----
1---------------- -i
U
W
--,
a-x
(t'
Q.
INDICATES CONCRETE IMPROVEMENTS
)(50.44
2.1%
..
INDICATES SPOT ELEVATION
INDICATES GROUND SLOPE
INDICATES WOOD DECK
x- INDICATES FENCELlNE
I-
0:::
:::J
o
o
(f)
0:::
1t
IMPROVEMENT LOCATION CERTIFICATE
LOT 2, APPLEWOOD PRESERVE SUBDIVISION
JEFFERSON COUNTY, COLORADO
DESCRIPTION
LOT 2, APPLEWOOD PRESERVE SUBDIVISION, CITY OF WHEAT RIDGE,
JEFFERSON COUNTY, COLORADO,
IMPROVEMENT LOCATION CERTIFICATE
I HEREBY CERTIFY THAT THIS IMPROVEMENT LOCATION CERTIFICATE WAS
PREPARED FOR LOU-MAR ENTITIES, THAT IT IS NOT
A LAND SURVEY PLAT OR IMPROVEMENT SURVEY PLAT AND THAT IT IS NOT
TO BE RELIED UPON FOR THE ESTABLISHMENT OF FENCE, BUILDING OR
OTHER FUTURE IMPROVEMENT LINES.
I FURTHER CERTIFY THAT THE IMPROVEMENTS ON THE ABOVE DESCRIBED
PARCEL, ON THIS DATE, MAY 28, 2008, EXCEPT UTILITY CONNECTIONS,
ARE ENTIRELY WITHIN THE BOUNDARIES OF THE PARCEL, EXCEPT AS SHOWN;
THAT THERE ARE NO ENCROACHMENTS UPON THE DESCRIBED PREMISES BY
IMPROVEMENTS ON ANY ADJOINING PREMISES, EXCEPT AS INDICATED, AND
THAT THERE IS NO APPARENT EVIDENCE OR SIGN OF ANY EASEMENT
CROSSING OR BURDENING ANY PART OF SAID PARCEL, EXCEPT AS NOTED.
~'"
. ('\ "'r:
<2I\\\)0Iid?/r
\:j\' ..C.~t~6~.~ ~
v.o\)O"-".:.L-'i.:'...f'.<-
'-.:l 6~~ ,j ." \:::J
.e!;} C..
.. rfl.
'" '<.W 16837 --<, =
~:'d: !;}:o
-<' ee .. ~
~n', ,'~
U.n .... .. ~,....._
u/O -..D... S"V
:tAL LA\\'\)
NOTICE: ACCORDING TO COLORADO LAW, YOU MUST COMMENCE ANY
LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE
YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT, IN NO EVENT, MAY ANY
ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE
THAN TEN YEARS FROM THE DATE OF THE CERTIFICATION SHOWN HEREON.
NOTES:
1. THIS SURVEY DOES NOT INCLUDE A TITLE SEARCH BY THIS SURVEYOR TO
DETERMINE:
A. OWNERSHIP OF THIS TRACT OR VERIFICATION OF THE DESCRIPTION
SHOWN;
B. THE COMPATIBILITY OF THIS DESCRIPTION WITH THAT OF ADJACENT
TRACTS;
C. EASEMENTS OR RIGHT-OF-WAYS OF RECORD;
BUT RELIED ON INFORMATION SUPPLIED BY THE OWNER.
2. ELEVATIONS ARE BASED UPON FIELD WORK PERFORMED ON MAY 28, 2008,
PREPARED BY: LANE ENGINEERING SERVICE, INC.
9500 WEST 14TH AVENUE, LAKEWOOD, CO 80215
TEL: (303) 233-4042 FAX: (303) 233-0796
PREPARED: OS/29/08
PROJECT: F48-34
f-
o
:2
:2
""
N
"
I
I
I
b I
0
d I
0
~
>-f-
f-Z
::;w :;::
-:::;; ,
f-w N
=>(/) ....
. <{ N
Sw ~
b
0
z
I
L
<Xl
o
o
N
.......
rn
N
.......
"'
.
-0
W
"
""
f-
(fJ
I
N
[
f-
o
--'
,/
'"
.
-0
,/
N
SCALE 1"= 20'
~--------
20
o
f-
o
--'
,/
f l'':"'.:':':..>:1
"
& l____:_~_:n:__.l-:-'.:.':r..m.....-...l...,."..::m.'1
o
W
-0
o~x
Ir
D-
,/
(fJ
!L(Qlu 35 I....
8902 '''~~:i.~'...'.'::'\.:~~:...~O';.;:'':',,::,;:'~,:,:.::,.:,~,.~'.,;:.,,~':'..:,"?'/!c1-:;'.:", ';. .'i ;
':". .~
x
~
Y'
~
l
I
:'-.,.:
4.3'
N
~
-..j
x
x
,
30
INDICATES WOOD DECK
,.1
I
..'.1:
10' UTILITY
EASEMENT
35.1'
~
~
~
(J1
o.
u:
6.0',
'1'
. : .
. .
o. "
~
N
<.0
d~::r
:J:t:
~ <;.-,:>: ~:-.~~~ ~',:~'
<;.:.~'~:.'~./::::<~':.:~':. ~ 4.6'
. ."..
. ~:...:-.., : ~
. :.
. :... , :':"~'.:
... A~: :.:' ""::
, .
39.1'
5' UTILITY
EASEMENT
10
20
INDICATES CONCRETE IMPROVEMENTS
x- INDICATES FENCELlNE
..
.;:-
I
I
~- ."..' I
,,;. .... ',.
.... '.
2.0' . ~
<.0;. 30.~' ~':,:
.?3.8' . .~';, I': 1
'., 1 ~ i
, ,: :.. ::", ~'" ':1 ,'.: ;..... . . . :<.,
.:........ '.: -:'>,,<,~".:'..'>':."'.:: "':: '. .:" .
:.... . .' '.... . ~ . . ,.:1. ..',."
.:.:....,.- ~:.....~ .":,:);:~": ,'.:. :....,;... __~~.... ~.~.~.'~>4.:~.~.~... . ~:. ~'. ;J '.~.'~: :" _ "
"'::',- . . ....." ,:,.;,-.," ......:.../~-..:;.~.~:.~ ~
. ~ .... . ~: ..' :-"..... . ,;.,. ,. -
..-... .
7.4'
" :;. :~:.
89029 36 W 125.04
!L(Qlu ~
....
LEGEND
)(50.44
2.1%
..
INDICATES SPOT ELEVATION
INDICATES GROUND SLOPE
I-
0::
:::>
o
o
(f)
0::
1t
IMPROVEMENT LOCATION CERTIFICATE
LOT 2, APPLEWOOD PRESERVE SUBDIVISION
JEFFERSON COUNTY, COLORADO
DESCRIPTION
LOT 2. APPLEWOOD PRESERVE SUBDIVISION, CITY OF WHEAT RIDGE,
JEFFERSON COUNTY. COLORADO.
IMPROVEMENT LOCATION CERTIFICATE
I HEREBY CERTIFY THAT THIS IMPROVEMENT LOCATION CERTIFICATE WAS
PREPARED FOR LOU-MAR ENTITIES, THAT IT IS NOT
A LAND SURVEY PLAT OR IMPROVEMENT SURVEY PLAT AND THAT IT IS NOT
TO BE RELIED UPON FOR THE ESTABLISHMENT OF FENCE. BUILDING OR
OTHER FUTURE IMPROVEMENT LINES,
I FURTHER CERTIFY THAT THE IMPROVEMENTS ON THE ABOVE DESCRIBED
PARCEL, ON THIS DATE, MAY 28, 2008, EXCEPT UTILITY CONNECTIONS.
ARE ENTIRELY WITHIN THE BOUNDARIES OF THE PARCEL, EXCEPT AS SHOWN;
THAT THERE ARE NO ENCROACHMENTS UPON THE DESCRIBED PREMISES BY
IMPROVEMENTS ON ANY ADJOINING PREMISES, EXCEPT AS INDICATED, AND
THAT THERE IS NO APPARENT EVIDENCE OR SIGN OF ANY EASEMENT
CROSSING OR BURDENING ANY PART OF SAID P ,CEPT AS NOTED.
"",\)0 KEG!e
\:::,'" .."......<; v~
~ ...."~UJGL1,...... ~
'-.:l ..~ oS'.. \::?
.e!:;j C,'''.
\:l:W (f):
~ . \- 1 lC:l>37 -l. n::
o "if) ~/2'
-::-.\ t..O:~
NOTICE: ACCORDING TO COLORADO LAW, YOU MUST COMMENCE ANY
LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE
YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT. MAY ANY
ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE
THAN TEN YEARS FROM THE DATE OF THE CERTIFICATION SHOWN HEREON.
NOTES:
1. THIS SURVEY DOES NOT INCLUDE A TITLE SEARCH BY THIS SURVEYOR TO
DETERMINE:
A. OWNERSHIP OF THIS TRACT OR VERIFICATION OF THE DESCRIPTION
SHOWN;
B. THE COMPATIBILITY OF THIS DESCRIPTION WITH THAT OF ADJACENT
TRACTS;
C. EASEMENTS OR RIGHT-OF-WAYS OF RECORD;
BUT RELIED ON INFORMATION SUPPLIED BY THE OWNER.
PREPARED BY: LANE ENGINEERING SERVICE, INC.
9500 WEST 14TH AVENUE. LAKEWOOD, CO 80215
TEL: (303) 233-4042 FAX: (303) 233-0796
PREPARED: OS/29/08
PROJECT: F48-34
[I[I]~~1Kl Components.
a WOlSELEYcompany
TRUSS DRAWINGS
PROJECT:
1 Lou- Mar Construction... Applewood Lot
FILE NAME: D-APPLWD-2007-(S)-(CO)
The attached truss drawings are for the above referenced project.
The seal on these drawings indicate acceptance of professional engineering responsibility
solely for the attached truss components as they are drawn. The suitability and use of
each individual component for any particular building is the responsibility of the building
designer, per ANSIITPI 1-2002 Chapter 2.
My license renewal date for Colorado is January 31,2009.
Andrew J. Herseth, PE
Stock Components
The file name and page numbering below indicate the total number of pages included in
this document.
D-APPLWD-2007 -(S)-(CO)
Page 1 of 81
APPLEWOOD
T20
MONO HIP
Lou.Mar Construdion..Applewood Lot 2
Job
Truss
Truss Type
St:oc:k Bllilding SLlpply, Denver, CO. 80229, Scott Th~on
Job Reference onal
6.500 Ii Feb 52007 MiTek ndusmeli, nc. Mon oct 1512:02:35 2007 Page 1
.,....
,....
..."
..."
....
3-11-fi
4xB =
13-2-t1
~H
Scale = 1:45.7
4
6xB =
5
1
I
I
I
,
1
0>
B.OO !12
1.5x4 0-
~
9-
~
3
2
....
....
7
3x8 =
I
13-2-8
.,~
6
4x4
I
4xB il
PlateOffsets(x.n r2'o-J..8Edael f4'().4..0o-1-91 r6'Edoeo-3-81
. ,
LOADING (psf) SPACING 2-0-. eS! i OEFL ,. (Ice) l/defl Ud I PLATES GRIP
TeLL 30.. Plates Inaease 1.15 Te ..99 I Vert(LL) .0,08 2-7 >999 240 MT20 1691123
(Roof Snow--30.0) I
TCDL 10.0 Lllmber Increase 1.15 Be 0.35 Vert(TL) .0.21 2.7 >740 18.
BCLL ... RepStress Incr NO we 0.28 Horz(TL) 0.01 6 01. 01. I
BCDL 10.0 Code IRC2003fTP12002 (Matrix) I Weight; 58 tb
LUMBER
TOP CHORD 2X4SPF1450F1.JE
BOTCHORD 2X4SPF 1450F 1.JE
WEBS 2 X 4 HF StudlStd *Excepto
WJ 2 X 4 WW Stud/Std, W1 2 X 4 WW StudJStd
BRACING
TOP CHORD
WEDGE
Left 2 X 4 WW StudlStd
BOT CHORD
WEBS
JOINTS
Structural wood sheathing directly applied or 6-0-0 oc purlins, except end
verticals, and 2.0-0 oc purlins (6-0-0 max.): 4-5.
Rigid ceiling directly applied or l0-0-0oc bracing.
1 Row at midpt 5-6
1 Brace at Jt(s): 5
REACTIONS (Ib/size) 6=6J4IMechanical,2=7741O-5-8
Max Harz 2=8O(LC 5)
Max Uplift6=-2n(LC 5), 2=-378(LC 5)
Max Grav 6=634{LC 1), 2=927(LC 2)
FORCES (Ib). Maximum CompressionIMaxlmum Tension
TOP CHORD 1-2=0165,2-3=-9281332, 3-4=-5691289, 4-5=-4041317, 5-6=-5891315
BOT CHORD 2-7=-1761648,6-7=01141
WEBS 3-7=-3471218, 4-7=-15J194, 5-7=-2081545
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.0pst; BCDL=6.Opst; Category II; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed;
end vertical left and right exposed; Lumber DOL=1.00 plate grip DOL=l.00.
2) TCLL: ASCE 7"'()2; Pf=3O.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; ct= 1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater ofmin roof live load of 20.0 pst or 1.00 times flat roof load of 30.0 pst on overhangs non-concurrent with
other live loads.
5) Provide adequate drainage to prevent water panding.
6) This truss has been designed for a 10.0 pst bottom chord live load nonCOrK;urrent with any other live loads.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 277lb uplift at joint 6 and 3781b uplift at joint 2.
9) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlfTPI1.
10) Design assumes 4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/2.1Od nails.
LOAD CASE(S) Standard
""WAR!\I~G READ ALL ~OTES O:'\' THIS PAGE A"\D THE ATTACHED GE'\"ERAL TRl'SS )'I;OTESPAGE BEFORE HA"\DLI)'I;G TRtlSSES
This design is based solely on parameters shown, and is for an individual building component not a truss system. Applicability of design parameters and sllitabiJi~
for this individual component and its loads are the responsibility of the building designer This truss must be installed and loaded "ertica1ly. Bracing shown is for
the lateral support of individual web members only. The top and bottom chords are laterally braced by rigid sheathing unless noted othenvise. Additional permanent
bracing orche overall structure is the responsibility ofthc building designer. 'l1ie erector is responsible for temporary bracinc to insure stability durinS construction
For general guidance regarding storage. handling. erection and bracing consult the following documents ANSlrrPll-2002 and DSB-89 available from
Truss Plate Institute, 218?'J. Lee Street, Slli!e 312, Alexandria VA 22314,/ wwvdpinsl.org'/ PH 703-683-]010 also consult the BCSlt-03 availabJefrom
Wood Truss Council of America. 6300 Enterprise Lane. MadisOlL W153719 iWW\\'.woodtrusscom/ PH 608_274_4849
~g~Kr
Components
.-
D-APPLWD-2007 -(S)-(CO)
Page 65 of 81
APPLEWOOO
T21
MONO HiP
Lou-Mar Construction...Applewood Lot 2
Job
Truss
TruS$Type
Stock Building Supply, Denver, CO. 80229, Scott TholTllson
Job RefBrence emal
6.SOO5Feb 52007 MiTek rtdustries, Ine. MonOct1512:02:372007 Paget
1-1-4-0
,....
..."
..."
,.....
4-11-6
13-2-8
~2~
4x8 =
Scale'" 1:55.7
4
ax8 :::;
5
~
j~1
o
,
"
Sx8 \\
7
6
4xB = 3x8 II
1ll-().() 13-2-.8
11l-O-(1 3-2-8
Plate Offsets ex. VI' r2-CI-4-O Edael [4'0-4-00..1 91 rS'o..3-8 Edael
. , , , .
LOADING (pst) i SPACING ,.... I eSI OEFL " (Ioc) IJdefl Ud PLATES GRIP
TeLL 30.0
(Roof Snow:3Q.O) Plates Increase 1.15 Te 0.51 Vert(LL) -0.20 '.7 >755 240 MT20 169/123
Lumber Increase 1.15 Be 0.55 Vert(TL) -0.52 '-7 >29' 180
reDL 10.0 Rep Stress Incr NO 1 we 0.49 Horz(TL) 0.01 6 of' of, ,
BelL 0,0 I
BCDl 10.0 Code IRC2OO3ITP12002 (Matrix) Weight: 64 Ib
LUMBER
TOP CHORD 2X45PF1450F1.3E
BOTCHORD 2X4SPF1450F1.3E
WEBS 2 X 4 WW StudlStd *Except*
W42X4 SPF 1450F 1.3E, W22X4HF Stud/Std
BRACING
TOP CHORD
BOT CHORD
WEBS
JOINTS
Structural wood sl1eat:hing directly applied or 6-0..0 oc purlins, except end
verticals, and 2-0-0 oc purlins (6-0-0 max.): 4-5.
Rigid ceiling directly applied or 6-0-0 oc bracing.
1 Row at midpt 5-6
1 Brace at Jt(s): 5
WEDGE
Left: 2 X 6 SPF 2100F 1.8E
REACTIONS (Ib/size) 6=634IMechanical,2=77410-5-8
Max Horz 2--86(LC 5)
Max Upliftfi=..2fi5(LC 5), 2=-369(LC 5)
Max Grav 6=634(LC 1), 2=984(LC 2)
FORCES (Ib) - Maximum Compression/Maximum Tension
TOP CHORD 1-2=0165,2-3=-9441322, 3-4=-5041249, 4-5=-2861290, 5-6=-6461313
BOT CHORD 2_7=-1591678,6-7=-41190
WEBS 3-7:461320,4-7=-174150,5-7=-2091680
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.0psf; BCDL=6.0psf; Category II; Exp C; enclosed; COC Exterior(2); cantilever left and right exposed ;
end vertical left and right exposed; Lumber OOL=1.00 plate grip DOL=1.oo.
2) TCLL: ASCE 7-02; Pf--30.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greaier of min roof live load of 20.0 pst or 1.00 times flat roof load of 30.0 psfon overhangs non-concurrent with
other live loads.
5) Provide adequate drainage to prevent water pending.
6) This truss has been designed fora 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 2651b uplift at joint 6 and 369lb uplift at joint 2.
9) This truss is designed in accordance with the 2003lntemational Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlrrPI1.
10) Design assumes 4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/2.1Od nails.
LOAD CASE(S) Standard
... \\'ARl'OI~G READ ALL NOTES O!\j THIS PAGE A'\"D THE ATTACHED GEJ\ER4.L TRt~SS ~OTES PAGE BEFORE HA!\DLI~G TRt:SSES
This design is based solely on parameters shown. and is for an individual building component not a truss system. Applicability of design parameters and suitability
for this individual component and its load, are the responsibility of the building designer. This truss must be installed and loaded venicaJly Bracing shown is for
the lateral support of individual web members only The top and bonom chords are laterally braced by rigid sheathing unless noted othef\\-'ise. Additional pennanent
bracing of the overall structure is the responsibility of the building designer. The erector is responsible for temporary bracing to insure stability during construction
For general guidance regarding storage, handling. erection and bracing consult the following documents A!'IlSlfTPI 1~2002 and DSB-89 available fTOm
Truss Plate Institute. 218 N. Lee Street. Suite 312. A]exandria VA 22314 /v.'Ww.tpinst.org./ PH 703-683-]0]0 also consult the BCSII-03 available from
Wood Truss Council of America. 6300 Enterprise Lane. Madisoll. Vi] 53719/w\vw.woodrruSS,com 'PH 608-274-4849
lIIm]~HI
Compon_
&'MJUlfI..O'eon'lCl8"Y
D-APPL WD-2007 -(S)-(CO)
Page 66 of 81
iAPPLEWOOO
MONO HIP
Lou-Mar Construction...Applewood Lot 2
Job
ITruss
T22
Truss Type
Stoc:k Building Supply, Denver, CO. 80229. Scott Tho~son
JobRefetenee 0 lonal
6.500 s Feb 52007 Mirek ~dustrie$.lne. Man Oct 15 12:02:38 2007 Page 1
-1-4-<11 ~10
1-4-<1 fi..O-10
12... 113-2~
~11-6 10x~
8.00 112 4x8
5 6
3x6 'l
\!
I ;;;;
! ice
Scale = 1:71.1
Jj
....
3x8 II
9
1.5x4
8 7
8x8 =
...."
...."
12...
5-11-6
3x~",~
1-2-8
Plate Offsets lx'Y}' r2,0-3-8 Edae1 r5,0-5-40-1.o1 r6,0-3-8 Edael 17' Edge 0-3-81
. , . . ,
LOADING (psf) SPACING '-0-0 I eSI DEFL ;n (Ioc) lldefl Ud PLATES GRIP
TCLL 30.0
(Roof Snow--30.0) Plates Increase 1.15 Te 0.71 Vert(LL) -0.04 ,., >999 240 MT20 169/123
Lumber Increase 1.15 Be 0.71 VertrrL) -0.10 ,., >999 180
TCDL 10.0 Rep Stress Incr NO we 1.00 Horz(TL) 0.02 7 nl. n].
BCLL 0.0
BCDL 10.0 Code IRC2003ITPI2002 (Matrix) Weight: 73 Ib
LUMBER
TOP CHORD 2X4SPF145Of1.3E
BOT CHORD 2X4SPF145Of1.3E
WEBS 2 X 4 WW StIJdlStd "Except"
W42X4SPF 1450F 1.3E, W12X4HFStud/Std, W22X4 HF StudlStd
BRACING
TOP CHORD
WEDGE
Left: 2 X 4 WW Stud/Std
BOT CHORD
WEBS
JOINTS
Structural wood sheathing directly applied or 5-9-1 OC purlins, except end
verticals, and 2-0-0 oc purl ins (6-0-0 ma): 5-6.
Rigid ceiling directly applied or 10-0-0 oc bracing.
1 Row at midpt 6-7,5-7
1 Brace at Jt(s): 6
REACTIONS (lbJsize) 7=6341Mechanical,2=77410-5-8
Max Horz 2=92(LC 5)
Max Uplift7=-250(LC 5), 2--362(LC 5)
Max Grav 7=732{LC 2), 2=1013(LC 2)
FORCES (Ib). Maximum CompresslonIMaximum Tension
TOP CHORD 1.2=0165,2_3=-10431262,3-4=-3481190,4-5=-1561224,5-6=-7/234,6-7=-291199
BOT CHORD 2-9=-1011700,8-9=-1011700,7-8=01189
WEBS 3-9=01263,3-8=-7061352,5-8=-3751451,5-7=-9031306
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.0pst; BCDL=6.0pst; Category it; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed ;
end vertical left and right exposed; Lumber DOL=1.00 plate grip DOL=1.00.
2) TCLL: ASCE 7-02; Pf--30.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 20.0 pst or 1.ootimesflat roof load of 30.0 pst on overhangs non-concurrent with
other live loads.
5) Provide adequate drainage to prevent water pending.
6) This truss has been designed fora 10.0 pst bottom chord live load nonconcurrent with any other live loads.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 250 Ib uplift at joint 7 and 362lb uplift at joint 2.
9) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referellCect standard
ANSIlTPl1.
10) Design assumes 4x2 (flat orientation) purlins at DC spacing indicated, fastened to truss TC w/2.1Od nails.
LOAD CASE(S) Standard
.... V."ARJ,'I~G READ ALL ~OTES 0,," THIS PAGE A"O THE ATTACHED GE!"ERAL TRI'SS NOTES PAGE BEFORE HA.!\DU'IrrlG TRI:SSES
This design is based solely on parameters shown, and is for an individual building component not a truss system. Applicability of design parameters and suitabilil)
for this individual component and its loads are the responsibility of the building designer. This truss must be installed and loaded venically. Bracing sho..."t is for
the lateral support of individual web members only. The top and bottom chords are ]aterally braced by rigid sheathing unless noted otherwise. Additiona] permanent
bracing of the overall structure is the responsibility oflbe building designer. The erector is responsible for temporlll)' bracing to insure stability during construction
for general guidance regarding storage, handling. erection and bracing consult the following documents ANSIrrPI 1~2002 and DSB-89 available from
Truss Plale lnstitute. 218 N. Lee Street. Suite 312. Alexandria V A 223]4 " wv,'v.-tpinsl.org i PH 703-683-10 I 0 also consult the BCS] 1-03 available from
\\'ood Truss Council of America 6300 Enterprise Lane. Madison. Wl 53719 i wv,'w.woodtruSS.com"" PH 608-274-4849
~~lKT
Compo__
.WOLIl!iI.11'~ny
D-APPL WD-2007 -(S)-(CO)
Page 67 of 81
APPLEWOOO
MONO TRUSS
Lou-Mar Construction. Applewood Lot 2
Job
Truss
Truss Type
T23
"
Job Reference 1Ional
6.500 s Feb 52007 MITek ndustr1es, Inc. Man Oct 1512:02:39 2007 Page 1
Stock Building Supply, Denver, CO. 80229, Scott ThOll1}Son
T
J
t
1#'
o
44<l 8-7-12 13-2-8
44<l ~,. ..."
8.00 [12 3x' II
8
5xB -:/
i
1.5x4 ,,\ ~
Scale::c 1:68.7
1-1-4-01
,....
3xB :1
SPACING Z.O-O
Plates Increase 1.15
Lumberlncrease 1.15
Rep Stress Iocr NO
Code IRC2OO3/TPI2002
I
8 7
3x4 = 3x6 =
I 13-2-8
....
DEFL In (Ioe) I/defl LJd PLATES GRIP
Vert(Ll) -0.05 7-8 >999 "" MT20 169/123
Vort(TL) -0.12 7-' >999 '88
HorzrrL) 0.02 7 01. 01.
Weight: 64lb
....
....
Plate Offsets ex.. V): r2:0-3-8.EdQel. [4'0-1.12.0-3--01
LOADING (psf)
TelL 30.0
(Roof Snow=30.0)
TeDL 10.0
BeLL 0.0
BCDL 10.0
LUMBER
TOP CHORD 2X45PF145OF1.3E
BOTCHQRD 2X4SPF145OF1.3E
WEBS 2 X 4 HF Stud/Std *Except*
W4 2 X 4 WW Stud/Std, W3 2 X 4 WW StudlStd
cs
Te 0.48
Be 0.34
WB 0.79
(Matrix)
BRACING
TOP CHORD
Structural wood sheathing directly applied or 6-(1..0 De purlins. except end
verticals.
Rigid ceiling directly applied or 1()..()..0 DC bracing.
1 Row at midpt 6-7
BOT CHORD
WEBS
WEDGE
Left: 2 X 4 V'M StudlStd
REACTIONS (Ib/size) 7=6341Mechanical, :Z=TI4ID-5-8
Max Horz 2=606(LC 5)
Max Uplift7=-420(LC 5), 2=-181(LC 5)
Max Grav 7=824{LC 2), 2=1017(LC 2)
FORCES (Ib) - Maximum CompressionIMaximum Tension
TOP CHORD 1_2=0165,2_3=-1078/0,3-4=-807113,4-5=-541115, 5-6=-168/101, 6-7=-2041141
BOT CHORD 2.S:-426I753,7-8=-231/424
WEBS 3-8=-3221261, !MJ=-1281426, 5-7=-692/384
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.0psf; BCDL=6.0psf; Category II; Exp C; enclosed; C.C Exterior(2); cantilever left exposed; end vertical
left exposed; Lumber DOL""1.00 plate grip DOL=1.00.
2) TClL: ASCE 7-02; Pf--3Q,0 pst (flat roof snow); Category II; Exp C; Partially Exp,; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of mln roof live load of 16.0 pst or 1.00 times flat roof load of 30.0 psf on overhangs non.concurrent with
other live loads.
5) This tnJSS has been desigllOd fora 10.0 pst bottom chord live load nonconcurrent with any other live loads,
6) Refer to glrder(s) for truss to truss connections,
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 420 Ib uplift at joint 7 and 1811b uplift at joint 2.
8) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlrrPI1.
LOAD CASE(S) Standard
... 'WARJIr\I~G _ READ ALL NOTES O~ THIS PAGE A:\"D THE ATTACHED GE1'\ERA.L TRUSS "iQTES PAGE BEFORE HA"\DLI:'\"G TRl!SSES
This design is based solely on pMameters sho'WIl. and is for an individual building component not a truss system, Applicability of design parameters and suitability
for this individual component and its loads are the responsibility of the building designer This truss must be installed and loaded vertically, Bracing shown is for
the lateral support of individual web members only. The top and bottom chords are laterally braced by rigid sheathing unless noted otherwise, Additional permanent
bracing of the overall structure is the responsibility of the building designer. The erector is responsible for temporary bracing to insure stability during construction
For general guidance regarding storage. handling, erection and bracing consult the following documents ANSlrrPI 1.2002 and DSB--89 available from
Truss Plate Institute, 218 N. Lee Street. Suite::;] 2. Alexandria VA 223]4 ,I www.tpinsl.org PH 703--683.1010 also consult the DeSl 1.03 available from
Wood Truss Council of J\merica 6300 Enterprise Lane. \1adison. \\-1 537]9,1 www.woodtruss.com;.PH 608-274-4849
ml~tc;J~
Compo--
IlWOlE.n~"Y
D-APPLWD-2007 -(S)-(CQ)
Page 68 of 81
Job
Trulls
Truss Type
""
Ply
I Lou-Mar Construction..Applewood Lot 2
1
APPLEWOOO
,
T24
SPECIAL
Stock Building Supply, Denver, CO. 80229, Sc:ott ThOl'Jl)son
Job ReferenclI tlenal
6.500 s Feb 52007 MiTek ndustris$, Inc. Mon Oct 1512:02:412007 Pilge 1
.,,,,
,...
.'-12
4-1-12
..,.
~,..
I
5x8 ::::
13-2-8
~,.
Scale'" 1 :45.5
5
3x8 Ii
6
8.00 [12
1.5x4.::::.-
q>
~
4
i..
1';1
,'\11
Q
2
8
6x8 =
~
Q
N
4x8 -::::
4.00[12
7
6x6 .:::::-
....
....
1:>2..s
....
PlateOffsets(Xn [2'0-0-106-2-41 [5'0-4-00-1.91 f7'D-2-11 Edael
. .
LOADING (pst) SPACING 2-0..0 C5I OEFL in (Ioc) I/defl Ud PLATES GRIP
TCLL 30.0
(Roof Snow--30.0) Plates Increase 1.15 TC 0.92 Vert(LL) 0.06 7-8 >999 240 MT20 169/123
Lumber Increase 1.15 BC 0.38 Vert(TL) -0.12 ,-8 >999 180
reDL 10.0 Rep Stress Incr NO WB 0." Horz(TL) 0.08 , nla nla
BelL 0.0
BCDL 10.0 Code IRC200JJTPI2002 (Matrix) Weight: 58 Ib
LUMBER
TOP CHORD 2X4SPF 1450F 1.3E
BOrCHORD 2X45PF145OF1.3E
WEBS 2 X 4 Hf StIJd/Std *Except.
W3 2 X 4 WW Stud/Std, W1 2 X 4 WW StudlStd
SUDER Left2X4WWStlJdlStd2.5-3
BRACING
TOP CHORD Structural wood sheathing directly applied or 5-4-10 oc purllns, except end
verticals, and 2-0-0 oc purlins (6-0-0 max..): 5-6.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
JOINTS 1 Brace at Jt(s): 6
REACTIONS (Ib/size) 2=769/0-5-8, 7=641JMechanlcal
Max Horz 2=74(LC 5)
Max Uplift2=-368(LC 5), 7=-282(LC 5)
Max Grav 2::Q2O(LC 2), 7=642(LC 1)
FORCES (Ib) - Maximum Compression/Maximum Tension
TOP CHORD 1-2=0154,2-3=-15281460,3-4=-13941483, 4-5=-1058/J48, 5-6=-431172, 6-7=-2741161
BOT CHORD 2-8=-31811182, 7-8=-261598
WEBS 4-8=-32fi1251, 5-8=-1091805, 5-7=-n11231
NOTES
1) Wind: ASCE 7..()2; 11Omph; h=25ft; TCDL=6.Opsf; BCDL=6.Opsf; Category II; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed;
end vertical left arKI right exposed; Lumber DOL=1.oo plate grip DOL=1.oo.
2) TeLL: ASCE 7-02; Pf=30.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; Ct:: 1
3) Unbalancecl snow loads have been considered for this destgn.
4) This truss has been desigrled for greater ofmin roof live load of 20.0 psf or 1.00 times flat roof load of 30.0 psf on overhangs non-concurrent with
other live loads.
5) Provide adequate drainage to prevent water pending.
6) This truss has been designed fora 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Refer to girder(s) for truss to truss connections.
8) Bearing atjoint(s) 2 considers parallel to grain value using ANSlrrPI1 angle to grain formula. Building designer should verify capacity of bearing
surface.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 368lb uplift at joint 2 and 282lb uplift at joint 7.
10) This truss is designed In accordance with the 2003 International Residential Code sections R50211.1 and R802.10.2 and referenced standard
ANSIITP11.
11) Design assumes4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/2-1Od nails.
LOAD CASE(S) Standard
~.~!1'8~~
~,~,~
~!to_(~_o~\
".. -
. .
. .
. .
-.. ."
. '.A~~
.WARNI'IrrlG READ ALL NOTES ON THIS PAGE A:\'D THE ATTACHED GENER-\L TRt'SS ~OTES PAGE BEFORE fl-\NDU....G TRrSSES
This design is based solely on parameters shown. and is for an individual building component not a truss system_ Applicability of design parameters and suitability
for this individual component and its loads are the responsibility of me building designer, This truss mllst be installed and loaded vertically_ Bracing shown is for
the lateral support of individual web members only_ The top and bottom chords are laterally braced by rigid sheathing unless nOled otherwise_ Additional pennanent
bracing of the overall structure i5 the responsibilil) oflhe building designer. The erector is responsibk for temporal)' bracing 10 insure stability during construction
For general guidance regarding storage, handling, erection and bracing consult the following documents ANSlrrPll~2002 and DSB-89 available from
Truss Plate Institute, 218 N. Lee Street. Suite 312. Alexandria V A 22314 "",,,",,,,,' ,tpinstorg i PH 703-68::-] 01 0 also consult the BCSI 1-03 available from
Wood Truss Council of America 6300 Enterprise Lane. Madison_ "VI 53719 ww,,",'woodtrusscom'/ PH 608-174-4849
~~lKl
eDIDpO__
aWOUB:n'ccmpanv
D-APPLWD.2007 -(S)-(CO)
Page 69 of 81
Job
Truss
Truss Type
Lou-Mar Construction ..Applewood Lot 2
APPLEWOOD
T25
I SPECIAL
I
.Job Raference 0 "onal
6.500 s Feb 52007 MITek r.dUstriSll, Inc. Man Oct 1S 12:02:42 2007 Page 1
Stock Building Supply, Denver, CO. 80229, Scott ThO"l'$On
1-14(11
,...
5-1-12
5-1.12
'"""
..,...
I
5xB =
'''~
~2~
Scale = 1:55.3
3x8
5
8
j
:;I
"
,.:.
8
6x8 =
~
~
'T
N
4.00[12
H4
H4
13-2-8
H4
7
ax8.;:;:,-
I
PlateOffsetslX.Yl- rZ'o-o-10Q..2-41 rS-0-4-0M.91 17'0-2.1 Edgel
. . ,
LOADING (pst) SPACING 2.... CS! DEFL In (Ioe) lldefl Wd I PLATES GRIP
TelL 30.0
(Roof Snow=30.0) Plates Increase 1.15 TC 0.50 Vert(LL) 0.09 7-' >999 240 MT20 1691123
Lumber Increase 1.15 BC 0.38 Vert{Tl) -0.13 7-' >999 180
reDL 10.0 Rep Stress Incr NO WB 0.89 Horz(TL) 0.09 7 nI. nI. I
BelL 0.0
aCDl 10.0 Code IRC2OO3fTPI2002 (Matrix) ! Weight: 62lb
LUMBER
TOP CHORD 2 X 4 SPF 1450f 1.3E
BOrCHORD 2X4SPF145OF1.3E
WEBS 2 X 4 WVV StudlStd "Except"
W32X4SPF 1450F 1.3E, W22X4 HF StudlStd
SLIDER Left 2X4WWStudlStd 3-0-10
BRACING
TOP CHORD
BOT CHORD
WEBS
JOINTS
Structural wood sheathing directly applied or 5-4-10 oc purlins, except end
verticals, and 2-0-0 oc purtins (6-0-0 max.); 5-5.
Rigid ceiling directly applied or 1o..Q-() oc bracing.
1 Row at midpt 6-7
1 Brace at Jt(s): 5
REACTIONS (Ib/size) 2:769/0.5-8,7=6421Mechanical
Max Harz 2--80(LC 5)
Max Uplift2=..358(LC 5), 7=-270(LC 5)
Max Grav 2=975(LC 2), 7=642(LC 1)
FORCES (Ib). Maximum Compression/Maximum Tension
TOP CHORD 1-2=0154, 2-3=-1555i413, 3-4=-13531445, 4-5=-12361402, 5-5=-171204,5-7=-1601125
BOT CHORD 2-8=-28011280,7-8=01333
WEBS 4-8=-387/309,5-8=-24511078,5-7=-7161180
NOTES
1) Wind: ASCE 7-02: 11Omph; h:25ft; TCDL:6.0psf; BCDL:6.Opsf; Category II; Exp C: endosed; C-C Exterior(2); cantilever left and right exposed:
end vertical left and right exposed; Lumber DOL:1.00 plate grip DOL:1.00.
2) TCLL: ASCE 7...(l2; Pf"'"-3Q.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; Ct: 1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 20.0 pst or 1.00 times flat roof load of 30.0 pst on overhangs non-concurrent with
other live loads.
5) Provide adequate drainage to prevent water ponding.
5) This truss has been designed fora 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Refer to glrder(s) for truss to truss connections.
8) Bearing at joint(s) 2 considers parallel to grain value using ANSlfTPI1 angle to grain fonnula Building designer should verify capacity of bearing
surface.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 358lb uplift at joint 2 and 270 Ib uplift at joint 7.
10) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlfTPI1.
11) Design assumes 4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/2-1Od nails.
LOAD eASE(S) Standard
.. WARNI~G READ ALL NOTES ON THIS PAGE A~D THE ATTACHED GEJ\ER4.L TRl'SS NOTES PAGE BEFORE HA'DLlNG TRl!SSES
This design is based solely on parameters sho~, and is for an individual building component not a truss system. Applicability of design parameters and suitabilit)
for this individual component and its loads are the responsibility of the building designer This truss must be installed and loaded vertically. Bracing shown IS for
the lateral suppOI1 of individual web members only. The top and bottom chords are ]aterally braced by rigid sheathing unless noted othen...ise Additional permanent
bracing of the overall structure is the responsibilil) ofthe building designer. The erector is responsible for temporary bracing to insW'e stability during construction
For general guidance regarding storage. handling. erection and bracing consult the following documents ANSlrrPI 1-2002 and DSB-89 available from
Truss Plate Institute, 218 N Lce Street. Suite 3]2. Alexandria. VA 223]4 iwwwtpinst.orgiPH703-683-]010alsoconsulttheBCSI 1-03 available from
Wood Truss Council of America. 6300 Enterprise Lane. Madison. \\1 537]9 iW',\'w.woodtrus5.com/ PH 608-274-4849
~~MJ
CoaLponelda
aWOtJilllt\'ODmf*'IY
D-APPLWD-2007 -(S)-(CQ)
Page 70 of 81
APPLEWOQD
126
SPECIAL
Lou-Mar ConstructionnApplewood Lot 2
iJob
Tross
TroIiST~
Stock Building Supply. Denver. CO. 80229, Scott Tho"ll5On
'JobReferenee 0 onal
6.500 s Feb 52007 MlTek ndustries, ne. Mon Oc:t 1512:02:43 2007 PlIge 1
4x8 ::::-
3x4 'i
4.00[12
"... 113--2-81
>~12 8-2~
5x == Scale = 1:65.2
8.00 [12 5x12
6
3x4 'i ;
3x' I
I
I
::;i;
I";
;
2 ,~
!";"
9 ,0
IN
6x8 == ;
8
8x8 :::::-
1~2-8 I
-
DEFL '" (Ioc) Ildefl Ud PLATES GRlP
Vert(LL) 0.10 ..9 >999 240 MT20 1691123
Vert(TL) -0.16 2.9 >97' 180
Horz(TL) 0.09 . oJ" oJ"
1.1-+0
,....
.....
.....
I" 2
j~l
o
; 1
J1
.....
.....
LOADING (psf)
TelL 30.0
(Roof Sn0w=30.0)
TCDL 10.0
BCLL 0.0
BCDL 10.0
LUMBER
TOP CHORD 2X4SPF145OF1.3E
BOTCHORD 2X4SPF1450F1.3E
WEBS 2 X 4 HF StlKllStd "Except"
W3 2 X4SPF 1450F 1.3E, W4 2 X4 WW StudlStd
Left 2X4WNStudlStd3-11-10
Plate Offsets ex Y): [2:0-0-10.0...2..41. [6:0-4-0,0...1-91. l7:o...3-8.EdQel r8:0-2-1 Edael
CSI
TC 0.84
BC 0.54
we 0.79
(Matrix)
SPACING 2-0-0
Plateslna-ease 1.15
Lumberlncrease 1.15
Rap Stress Incr NO
Code IRC2OO3/TPI2002
Weight: 69 Ib
SUDER
BRACING
TOP CHORD
BOT CHORD
WEBS
JOINTS
Structural wood sheathing directly applied or 5-0-1 DC purlins, except end
verticals, and 2..o-ooc purl ins (6-0-0 max..): 6-7.
Rigid ceiling directly applied or 10...0...0 oc bracing.
1 Row at midpt 7-8,6-8
1 Brace at Jt(s): 7
REACTIONS (Ib/size) 2:=76910-5-8, 8=642IMechanical
Max Horz 2--89(LC 5)
Max Uplift2=-351(LC 5), 8=-255(LC 5)
Max Grav 2:=1005(LC 2), 8=743(LC 2)
FORCES (Ib) _ Maximum CompressionIMaximum Tension
TOP CHORD 1_2:=0154,2_3==--16231326,3-4=-1369/350,4-5=-15261606,5-6:=-13471635,6-7=-131246,7-8=..461234
BOT CHORD 2-9==-17711225,6-9==01225
WEBS 4-9==-593/455, 6-9=-55111544, 6-8=-359124
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL::6.0psf; BCDL=6.0psf; Category II; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed;
end vertical left and right exposed; Lumber DOL=1.00 plate grip DOL=1.00.
2) TCLL: ASCE 7-02; Pf::30.0 psf (flat roof snow); Category II; Exp C; PartIally Exp.; Ct= 1
3) Unbalanced SIlOW loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat rocf load of 30.0 psf on overhangs IlOn-concurrent with
other live loads.
5) Provide adequate drainage to prevent water pending.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Refer to girder(s) for truss to truss connections.
8) Bearing at joint(s) 2 considers parallel to grain value using ANSIITPI1 angle to grain fonnula. Building designer should verify capacity of bearing
surface.
9) Provide mechanical connection (by others) of truss to bearing plate capable of with standing 3511b uplift at joint 2 and 255lb uplift at joint 8.
10) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.102 and referenced standard
ANSIITPI1.
11) Design assumes4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/2-1Od nails.
LOAD CASE(S) Standard
.WAR"..Il"G READ ALL ~OTES 0",", THIS PAGEA""D THE ATTACHED GE""ERAL TRVSS !\OTES PAGE BEFORE H.4.""DLI""G TRt~SSES
This design is based solely on parameters shown. and is for an individual building component not a truss system. Applicability of design parameters and suitabilit)
for this individual component and its loads are the responsibility of the building designer TIus truss must be installed and loaded venical]y Bracing shov.'D is for
the lateral support of individual web members only. The top and bottom chords lITe ]aterally braced hy rigid sheathing unless noted otherwise Additional permanent
bracing of the overall structure is the responsibility of the building designer The erector is responsible for temporary bracing to insure stability during construction
For general guidance regarding storage. handling, erection and bracing consult the following documents A!'ISlfTPI1.2002 and DSB-89 available from
Truss Plate Instimte, 218 K Lee Street. Suite 312. Alexandria V A 223] 4 wW'\\.tpinst,org I PH 703-683. I 0] 0 also consult the BCSI 1-03 available from
Wood Truss Council of America 6300 Enterprise Lane. Madison. \\-1 53719:wwwwoodtrusscom'/ PH 608.274-4849
~~fKJ
Componente
. WOlS8.n"corroplIll~
D-APPLWD-2007 -(S)-(CO)
Page 71 of 81
APPLEWOOD
TV
iTrussTyPl!
SPECIAL
lou-Mar Construction ..Applewood lot 2
Jo'
Truss
Stock Building Supply, Denv..r, CO. 80229, Scott Th~on
JobR.ference 0 Uonel
6.500 s Feb 52007 MITek ndusmes. k'lc. Mon Oct 1512:02:442007 Page 1
1_1-4-01
,....
4-<><>
4-<><>
....
4-2.
13-2..a
4-<><>
8.00 [12
3x4 I!
7
Scale = 1 :68.5
..
1.
1:ij1
, ,
o
6x8 'i
1.5x4 .:::::-
3
9
6x8 =
I~
]~
4x8 :::::-
3x6 'l
4.00 [12
......
......
8
4x4.:::::
13-2..a
......
Plate Offsets (X,YI: r2:G-O-10 0-2-41. rS:0-0-12.0-3-01
lOADING (pst)
TCll 30.0
(Roof Snow=3ll.0)
TCDL 10.0
BCLL 0.0
BCDL 10.0
LUMBER
TOP CHORD 2X4SPF145OF1.3E
BOTCHORD 2X4SPF145OF1.3E
WEBS 2 X 4 HF StudlStd "Except"
W4 2 X 4 WN StuQ'Std, W3 2 X 4 WN StudlStd
Left2X4WW StudlStd 2-7-13
SPACING 2-0-0
Plates Increase 1.15
Lumber Increase 1.15
Rep Stress Incr NO
Code IRC2OO3ITPI2002
CSI
TC 0.45
BC 0.41
WB 0.80
(Matrix)
DEFL
Vert(LL)
Vert(TL)
Horz(TL)
In
-0.06
-0.13
0.10
(toe)
"
8-"
8
Ildefl
>999
>999
nla
Ud
240
180
nla
PLATES
MT20
GRIP
169/123
Weight: 64 Ib
BRACING
TOP CHORD
BOT CHORD
WEBS
Structural wood sheathing 6&ctly applied or 5-0-4 oc pur1ins, except end
verticals.
Rigid ceiling directly applied or 7-4-7 oc bracing.
1 Row at midpt 7-8,6-8
SLIDER
REACTIONS (Ib/size) 2=769/1).5-8, 8=642/Mechanlcal
Max. Horz 2=602(LC 5)
Max. Uplift2=-168(LC 5), 8=-427(LC 5)
Max. Grav 2=1008(LC 2), 8=834(LC 2)
FORCES (lb) - Maximum CompressionlMaximum Tension
TOP CHORD 1_2=0154,2_3=-1756/367,3-4=-16101394,4-5=-13071273,5-6=-1040/276,6-7=-169/97,7-8=-1961138
BOT CHORD 2-9=-79411366,8-9=-3261605
WEBS 4-9=-313/276,6-9=-4151965,6-8=-932/514
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.0psfj BCDL=6.0psf; Category 11; Eli;p C; enclosed; C-C Exterior(2); cantilever left exposed; end vertical
left exposed; Lumber DOI..=1.00 plate grip DOL=1.00.
2) TCLL: ASCE 7-02; Pt--30.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) UnbalallC8d snow loads have been considered for this design.
4) This truss has been designed for greater ofmin roof live load of 16.0 psf or 1.00 times flat roof load of 30.0 psf on overhangs non-concurrent with
otherliveloacls.
5) This truss has been designed for a 10.0 psf bottom chord live load Ilonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Bearing at jolnt(s) 2 considers parallel to grain value using ANSlfTPl1 angle to grain fOnTlula. Building designer should verify capacity of bearing
surface.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 168lb uplift at joint 2 and 427lb uplift at joint 8.
9) This truss is designed In accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlfTPI1.
LOAD CASE(S) Standard
.&.WAR"!'.lIlriG READ AL.L ~on:s 01\ THIS PAGE A....D THE ATTACHED GE"I\ERAL TRl'SS 1lri0TES PAGE BEFORE HA....DLll\G TRl!SSES
This design is based solely on parameters shown. and is for an individual building component not a truss system Applicability of design parameters and suitability
for this individual component and its loads are the responsibility of the building designer This truss must be installed and loaded ".ertically. Bracing shown is for
the lateral support of individual web members only. The top and bottom chords are laterally braced by rigid sheathing unless noted othenvise. Additional pennanent
bracing of the overall structure is the responsibility of the building designer The erector is responsible for temporary bracing to insure stability during construction
For general guidance regarding storage. handling, erection and bracing consult the following documents Al'\SlffPI1-2002 and DSB-89 available from
Truss Plate Institute. 218 N. Lee Street. Suite 312. Alexandria VA 22314 iwwv..tpinSl.orgi PH 703-683-1010 also consult the BCSII-03 available from
Wood Truss Council of America, 6300 Enterprise Lane. Madison. \VI 53719 www.woodtruSS.comiPH 608_274-4849
~lClIKI
Cv.. .- DRents
.--
D-APPLWD-2007 -(S)-(CQ)
Page 72 of 81
APPLEWOOO
V01
VALlEY
Lou-Mar Construction...Applewood Lot 2
Job
Truss
TrussTyplI
2-8-15
2-&-15
Job Rllference 0 ionBI
6.S00sFllb 52007MiTek r.dustries, lnc. MonOct1S12:02:462007 Pagll1
3x4 II
I
Stock Building SUpply, Denver, CO. 80229, SCOtt TholTllliOll
Scale: 1:16.2
-
l
12.00 112
.,
3
~...A //
2-$-15
2-&-15
1....4 II!
LOADING (psf) SPACING 2-0-0 I OSI OEFL ;n (Ioc) Ildefl i PLATES
TelL 30.0 Ud GRIP
(Roof Snow--30.0) Plates Increase 1.15 TC 0.39 Vert(LL) nlo nla ... MT20 1691123
TCDl 10.0 Lumber Increase 1.15 BC 0.04 Vert(TL) nla nla ...
BelL 0.0 Rep Stress Incr NO WB 0.00 Horz(TL) 0.00 3 nla nla
BCDL 10.0 , Code IRC2003ITPI2002 (Matrix) Weight:9lb
LUMBER
TOP CHORD 2X4SPF145OF1.3E
BOT CHORD 2 X 4 SPF 1450F 1.3E
WEBS 2 X 4 VIMI StudlStd
BRACING
TOP CHORD
BOT CHORD
Structural wood sheathing directly applied or 2-8-15 oc purlins, except end
verticals.
Rigid ceiling directly applied or 10-0-0oc bracing.
REACTIONS (lbJsi;Ee) 1=102/2.8-15,3=10212-8-15
Max Harz 1=11(LC 5)
Max Uplift1=-J9(LC 5), J=..52(LC 5)
Max Gray 1=133(LC 2), 3=133(LC 2)
FORCES (Ib) - Maximum CompressionIMaximum Tension
TOP CHORD 1-2=-66166,2-3=-112f64
BOT CHORD 1-3=0172
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.Opsf; BCDL=6.0psf; Category II; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed;
end vertical left and right exposed; Lumber DOL=1.00 plate grip DOL=1.00.
2) TCLL: ASCE 7-02; Pf=30.0 pst lflat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) this truss has been designed fora 10.0 pst bottom chord live load nonconcurrent with any other live loads.
5) Gable requires continLKJus bottom chord bearing.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 39lb uplift at joint 1 and 52lb uplift at joint 3.
7) This truss Is designed in accordance with the 2003lntemational Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlrrPI1.
LOAD CASE(S) Standard
"''''ARl\l~G READ ALL J\OTES Ol\ THIS PAGE Al\D THE ATTACHEDGE!Iri'ERU TRllSS )'o;OTES PAGE BEFORE HA;'oiDLI;\1G TRrSSES
This design is based solely on pw-ameler, shown, and is for an individual building component not a truss system Applicability of design parameters and suitability
for this individual component and its loads are the responsibility of the building designer This truss must be installed and loaded vertically Bracing shown is for
the ]ateral support of individual web members only The top and bottom chords are laterally braced by rigid sheathing unless noted otherwise. Additional permanent
bracing of the overall structUre is the responsibility of the building designer. The erector is responsible for temporar)' bracing to insure stabili'l)-' during construction
For general guidance regarding storage, handling, erection and bracing consult the following documents A/'IiSlffPll-2002 and DSB-89 available from
Truss Plate Institute. 2]8)\. Lee So-eet. Suite3J2. Alexandria. VA 223]4 i wwwtpinsLorgiPH703-683-]0]Oalsoconsultthe BCST T-0311vailab1e from
Wood Truss Council of America. 6300 Enterprise Lane. \111disoll. \V] 53719 www.woodtrusscom,/PH608-174-4849
lmI[j]~MI
Components
.WOtSEI.n'~"Y
D-APPLWD-Z007 -(S)-(CQ)
Page 73 of 81
APPLEWOOD
Y02
Truss Type
'VALlEY
"'"
Ply
Lou-Mar Construction...Applewood Lot 2
Job
Truss
Stoek Building Supply, Denver, CO. 80229, Sc:ott Thol1llson
JobRBference 0 onal
6.500 s Feb S 2007 MITBlI ndustrles, ne. Moo Oct 1S 12:02:47 2007 Page 1
3x4 II
~
4-10-15
4-10-15
3
Scale = 1:27.0
12.00 112
3x4
3x4'l
4-10-15
tM511
.sx4 II
LOADING (pst) SPACING 2-0-0 I CSI DEFL In (Ioc) Ildefl Ud ] PLATES GRIP
TCLL 30.0
(Roof Snow--30.0) Plates Increase 1.15 TC 0.43 Vert(LL) nI. nI. 90S MT20 1691123
TCDL 10.0 Lumber IrtereaSe 1.15 i BC 0." Vert(TL) nI. nI. 90S
BCLL 0.0 Rep Stress Incr NO WB 0.33 Horz(TL) 0.00 4 nI. nI.
BCDL 10.0 Code IRC2003ITPI2002 (Matrix) Weight: 20lb
LUMBER
TOP CHORD 2X4 SPF 1450F 1.3E
BOT CHORD 2X4SPF145QF1.3E
WEBS 2X4SPF 1450F 1.3E
OTHERS 2 X 4 WW StutVstd
BRACING
TOP CHORD
BOT CHORD
Structural wood sheathing directly applied or 4-10-15 DC purlins, except end
verticals.
Rigid ceiling directly applied or 10-0-0 oc bracing.
REACTIONS (Ib/size) 1=7714-10-15,4-""'9014-10-15,5=275/4-10-15
Max Horz 1=22(LC 5)
Max Upllft5=-309(LC 5)
Max Grav 1=1OQ(LC 2), 4=117(LC 2), 5=357{LC 2)
FORCES (Ib) - Maximum CompressionlMaximum Tension
TOP CHORD 1-2=-1591104,2-3=-1101117,3-4=-9910
BOT CHORD 1.5=01141,4-5=01141
WEBS 2-5=-302/342
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=G.Opsf; BCDL=6.0psf; Category II; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed;
end vertical left and right exposed; Lumber DOL=1.00 plate grip DOL=1.00.
2) TCLL: ASCE 7-02; Pf=30.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads nave been considered for this design.
4) This truss has been designed fora 10.0 pst bottom chord live load nonconcurrent with any other live loads.
5) Gable requires continuous bottom chord bearill9.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 3091b uplift at joint 5.
7) This truss is designed in accordance with the 2003lntematlonal Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlrrPI1.
LOAD CASE(S) Standard
.... 'WAR;"tII'\G READ ALL NOTES O"l THIS PAGE A!\ro.O THE ATTACHED GE"\ERAL TRUSS '\OTES PAGE BEFORE HA"'DLlNG TRl:$SES
This design is based solely on parameters shown, and is for an individual building component not a truss system, Applicability of design parameters and suitabilit)
for this individual component and its loads are the responsibility of the building designer This truss must be installed and loaded venically. Bracing shown is for
the lateral support of individual web members only. The lOp and bottom chords are laterally braced by rigid sheathing unless noted otherwise Additional permanent
bracing oftbe overall structure is the responsibility of the building designer, The erector is responsible for temporary bracing to insure stability during construction
For general guidance regarding storage. handling. erection and bracing consult the following documents ANSlrrPI 1-2002 and DSB-89 available from
Truss Plate Institute. 218 N. Lee Street Suite ::12. Alexandria VA 22314 /wwwtpinsLorg"-PH703-683-1010alsoconsultthe BCS11-03 available from
Wood Truss Council of America. 6300 Enterprise Lane_ Madison. WI 53719 i www,woodtrusscom,"-PH608-274-4849
~~~
Components
a~company
D-APPLWD-2007 -(S)-(CO)
Page 74 of 81
APPLEWOOD
V03
VAllEY
Lou-Mar Censtructien...Applewood let 2
Job
Truss
Tru$&Type
Stock Building Supply, Denyer, CO. B0229, Sc:ott Tho~son
Job R.~renee 0 .anal
6.500 s Feb 52007 MlTek ~dustries,lnc. Mon Oct 1512:02:48 2007 Paga1
~
~
18-2-15
4x4~14
Scalec:1:51.3
3
j
12.00 If2
3x4 Ii
'"I
~
..
3x4 'l
7
3x4 II
~2-1S
8-215
3x4 Ii 3x4
I
6
5
LOADING (pst) SPACING 2-0-0 CS! DEFL ;" (lac) lldefl Ud PLATES GRIP
TCll 30.0
(Roof Snow--30.0) Plates Increase 1.15 TC 0.48 Vert{Ll) <>I. <>I. 099 MT20 1691123
TCDL 10.0 Lumber Increase 1.15 BC 0.10 Vert(TL) <>I. <>I. 099
BCLL 0.0 RepStress Incr NO we 0.45 Herz(Tl) 0.00 5 <>I. <>I.
BCDL 10.0 Code IRC2003ITPI2002 (Matrix) Weight: 371b
LUMBER
TOP CHORD 2X4SPF145OF1.3E
BOTCHORD 2X4SPF145OF1.3E
WEBS 2 X4 SPF 1450F 1.3E ~Except~
W12X4WNStud!Std
OTHERS 2X4WWStud!std
BRACING
TOP CHORD
BOT CHORD
Structural wood sheathing directly applied er 6-0-0 oc pur1ins, except end
verticals.
Rigid ceiling directly applied or 10-0-0 DC bracing.
REACTIONS (Ib/size) 1=15318-2-15,5:7818-2-15,7=39818-2-15,6=14618-2-15
Max Horz 1=21(LC 5)
Max Uplift1=-5(LC 5), 5=-224{LC 5), 7=-422(LC 5)
Max Grav 1=199(lC 2), 5=102(lC 3), 7=517(lC 2), 6=332(lC 5)
FORCES (lb) - Maximum CompressionIMaximum Tension
TOP CHORD 1-2=-921174,2-3=-1351286,3-4=-501274,4-5=-881232
BOT CHORD 1-7;()/13S, 6-7;()/138, 5-6=01138
WEBS 2-7=-439/469,3-6=-31310
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.0psf; BCDL=6.0pst; Category II; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed ;
end vertical left and right exposed; Lumber DOL=1.00 plate grip DOL=1.00.
2) TClL: ASCE 7-02; Pf--30.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for a 10.0 pst bottom chord live load nonconcurrent with any other live loads.
5) Gable requires continuous bottom chord bearing.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding Sib uplift at joint 1, 224lb uplift at joint 5 and 422lb
uplift at joint 7.
7) This truss is designed in accordance with the 2003 I ntemational Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlfTPl 1.
LOAD CASE(S) Standard
~.~~~~
,#:#"J.~\.~
i~O-(~-O ....~
~. :
. .
.. .
. .
. .
. .
. .
. .
. "A/~
... WAR'\ING READ ALL "'IOTES 0' THIS PAGE A'D THE ATTACHED GENER.\L TRl$S NOTES PAGE BEFORE HA!'DLlNG TRrSSES
This design is based solely on parameters shown, and is for an individual building component not a truss system. Applicability of design parameters and suitability
for this individual component and its loads are the responsibility of the building designer. This truss must be installed and loaded vertically_ Bracing shown is for
the lateral support of individual web members only The top and bottom chords are laterally braced by rigid sheathing unless noted otherwise, Additional permanent
bracing of the oVl.':ralJ structure is the responsibility of the building designer, The erector is responsible for lemporary bracin8 10 insure stability during construction
For general guidance regarding storage, handling, erection and bracing consult the following documents ANSlrrP11-2001 and DSB-89 available from
Truss Plate Institute, 218:---J, Lee Street. Suite 312. Alexandria VA 22314 / www_tpinst,org/PH 703-683-1010 also consult the BCSII-03 available from
Wood Truss Council of America. 6300 Enterprise Lane. Madison. 'VI 53719 / www,woodtruss_com/PH 608-274-4849
~~Kl
Components
.-.an_
D-APPLWD-2007 -(S)-(CO)
Page 75 of 81
APPLEWOOD
V04
GABLE
Lou-Mar Construct.ion...Applewood Lot 2
Job
Truss
Truss Type
Stock Building Supply, Denver. CO. 80229. Scott Tho~son
JobReferenC6 0 10m"
6.SOOsFeb 52007MiTek r.dustrles, Inc. MonOct1512:02:492007 Pagel
7-10-0
7-10-6
9-6-15.1().&.;
4x41*14 1-1-2
Scale = 1 :65.5
1,2.00 [i2
~
I
1.5x4 II
1.5x4 II
Q
.;
,;,
12
3x4 ij
1.5x4 II
11
1.5x4
109
3x4 !I
1.5x~1~;
1-1-2
"'15
"'15
Plate Offsets (X,V): r4:0-2-O,EdAel
LOADING (pst)
TCLL 30.0
(Roof Sn0w:30.0)
TCDL 10.0
BeLL 0.0
BCDL 10.0
LUMBER
TOP CHORD 2X4SPF1450F1.3E
BOT CHORD 2 X 4 SPF 1450F 1.3E -Except"
B22X4 WWStudJStd
2X4WWStudJStd
SPACING 2-0-0
Plates Increase 1.15
Lumberlncrease 1.15
Rep Stress Iner NO
Code IRC2OQ3fTPI2002
CSI
TC 027
BC 0.19
WB 0.37
(Matrix)
DEFL
Vert(LL)
Vort(TI.)
Horz(TL)
in (Ioc)
oJ.
oJ.
0.04 8
I/defl
oJ.
oJ.
oJ.
Ud
999
999
oJ.
PLATES
MT20
GRIP
169/123
Weight: 46 Ib
BRACING
TOP CHORD
BOT CHORD
Structural wood sheathing directly applied or 6-0-0 oc purlins.
Rigid ceiling directly applied or 10-0-0 oc bracing, Except:
6-0-0 ocbracirtg: 7-8.
&-0-0 oc bracing: ~
OTHERS
REACTIONS (Ib/size) 1=10/10-8-1,7::24110-8-1,9=8110-8-1, 8=6BJ1Q.8.1, 11=387/10-8-1, 12=302I1Q.8.1,1O=198110-8-1
Max Horz 1=315(LC 5)
Max Uplift7=-48(LC 5), 9=-72(LC 4), 8=-116(LC 5), 11=-304(LC 5), 12=-339(LC 5)
MaxGrav 1=33O(LC 5), 7=34(LC 3), 9=8(LC 1), 8=114(LC 3), 11=4B9(LC 2), 12--398(LC 2), 10=2OO(LC 4)
FORCES (lb) - Maximum Compression/Maximum Tension
TOP CHORD 1_2--467198,2_3=-181/138,34=-153/118,4-5=-99/97,5-6=-27/132, 6-7=-0/69
BOT CHORD 1-12=0/8,11-12=018, 10-11=0f8, 9-10=018, 8-9=0/0, 6-8=-117195, 7-8=-810
WEBS 3-11"'-411/349,2-12=-3471388,5-10=-16310
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCOL=6.0psf; BCDL=6.0psf; Category II; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed;
end vertical left and right exposed; Lumber DOL=1.00 plate grip DOL=1.00.
2) TCLL: ASCE 7-02; Pf=30.0 psf (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed fora 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5) Gable requires continuous bottom chord bearing.
6) Bearing atjoint(s) 8 considers parallel to grain value using ANSlrrPI1 angle to grain fonnula. Building designer should verify capacity of bearing
suriace.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 48lb uplift at joint 7, 721b uplift at joint 9, 1161b uplift
at joint 8, 304lb uplift at joint 11 and 339lb uplift at joint 12.
8) Beveled plate or shim required to provide full bearing suriacewith truss chord atjolnt(s) 7.
9) This 1russ is designed In accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard
AN$lrrPI1.
LOAD CASE(S) Standard
... \\"ARl'\I~G READ ALL NOTES ON THIS PAGE AlIri'D THE ATTACHED GE1\ERAL TRt:SS ~OTES PAGE BEFORE HAl\DLI!\lG TRt:SSES
This design is based soleI) on parameters shown, and is for an individual building componelll no! a truss system. Applicability of design parameters and sujtabili~
for this individual component and its loads are the responsibility of the building designer This truss must be installed and loaded vertically Bracing shown is for
the lateral suppon of individual web members only, The top and bonom chords are laterally braced by rigid sheathing unless noted otherv.'ise. Additional pennanent
bracing of the overall structure is the responsibility of the building designer The erector is responsible for temporary bracing to insure stability during construction
For general guidance regarding storage. handling, erection and bracing consult the following documents A!\lSlffPI1-2002 and DSB-89 available from
Truss Plate Institute, 218 K Lee Street, Suite 312. Alexandria VA 22314 ww'wtpinsl.org i PH 703-683-1010 also consult the BCSI 1-03 available from
Wood Truss Council of America 6300 Enterprise Lane. Madison, \\'1 53719'" wwwwoodrruss,comiPH608-274.4849
~lCllKJ
Components
.-.an_
D-APPLWD-2007 -(S)-(CO)
Page 76 of 81
Job
Truss
iTrussType
GABLE
Lou-Mar Construction..,Applewood Lot 2
APPLEWOOO
vos
JobReferencll 0 'onel
6.500 5 Feb 52007 Milek ndustri86, Inc. Mem Oct 1512:02:50 2007 Peg. 1
stock Building Supply, Denver, CO. 80229, Scott ThoJ11:lson
9-2-1
>-2-'
~o-lo-1~ 1).4.1
6xB-&.14 2_5-2
Scale'" 1:76.4
4 3.4
1.5x4 II
12.00 [12
~ 1.5x4 II 3 7
I~
i~
,
I
4x6 ,y 12 11 10 9
1.5x4 II 1.5x4 3.4 II
10-10-15 1.5x4 II ,...,
10-10-15 2-5-2
PlateOffsetslx-n r1'o-5-1 Edoel f7"0-()"9o-1-81
.
LOADING (pst) SPACING '-0-0 eS! DEFL i. (Ioe) l/defl Ud I PLATES GRIP
TeLL 30.0
(Roof Snow--30.0) Plates Increase 1.15 Te 0.26 Vert(LL) oJ, oJ, 999 I MT20 1691123
TCDL 10.0 Lumber Increase 1.15 Be 0.25 Vert(TL) oJ, oJ, 999
BeLL 0.0 Rep Stress Incr NO WB 0.36 Horz(TL) 0.01 7 oJ, oJ,
BCDL 10.0 , Code IRC2003ITPt2002 (Matrix) Weight: 63 Ib
LUMBER
TOP CHORD 2X4SPF145OF1.3E
BOT CHORD 2 X 4 SPF 1450f 1.3E .Except.
82 2X 4 HF Stud/Std
OTHERS 2 X 4 WW Stud/Std .Except.
ST3 2 X 4 HF stud/Std
BRACING
TOP CHORD
BOT CHORD
WEBS
Structural wood sheatning directly applied or 6-0-0 oc purlins.
Rigid ceiling directly applied or 6-0-0 oc bracing. Except:
6-0-0 oc bracing: 6-8
1 Rowatmidpt >10
REACTIONS (lbJsize) 1=150113-4-1,7=104113-4-1,9=9113-4-1,8=168/13-4-1,11=239113-4-1.10=217/13-4-1,12'--378113-4-1
Max Horz 1=305(LC 5)
Max Uplift7=-98(LC 5), 8=-19O(LC 5), 11=-197(LC 5), 12=-380(LC 5)
Max Grav 1=195(LC 2), 7=129(LC 3), 9=14(LC 4), 8=254(LC 3), 11=311(LC 2), 10=225(LC 5), 12=492(LC 2)
FORCES (Ib). Maximum CompressionIMaximum Tension
TOP CHORD 1_2=-297/148,2_3=-121187,3-4=-1091219,4-5=-901108,5-6=-661252, 6-7=-991120
BOT CHORD 1-12=-1/2,11-12=-1/2,10-11=-1/2,9-10=-1/2, 8-9=OKl, 6-8=-2131182, 7-8=-11/15
WEBS 3-11=-2n1242, 5-10=-20610, 2-12=-380/381
NOTES
1) Wind: ASCE 7-02; 11Omph; h=2Sft; TCDL=6.0psf; BCDL=6.Opsf; Category II; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed;
end vertical left and right exposed; Lumber DOL=1.00 plate grip DOL=1.00.
2) TCLL: ASCE 7-02; Pf=30.0 psf (flat roof snow); Category 11; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for a 10.0 psf bottom coord live load nonconcurrent with any other live loads.
5) Gable requires continuous bottom chord bearing.
6) Bearing at joint(s) 8 considers parallel to grain value using ANSlfTP11 angle to grain fonnula. Buildill9 designer should verify capacity of bearing
surface.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 98 lb uplift at joint 7, 190 Ib uplift at joint 8, 1971b
uplift at joint 11 and 380 lb uplift at joint 12.
8) Beveled plate or shim required to provide full bearing surface with truss chord atjolnt(s) 7.
9) This truss is designed in accordance with the 2003lntemational Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlfTPI1.
LOAD CASE(S) Standard
... WARNI:'\'G READ ALL NOTES O;\l THIS PAGE A;\lD THE ATTACHED GESER4.L TRI!SS ;\lOTES PAGE BEFORE HA"'DLlNG TRI1SSES
This design is based so]e1y on parameters shov.'II. and is for an individual building component not a truss system Applicability of design parameters and suitability
for this individual component and its loads are the responsibility of the building designer This truss must be installed and loaded \'errically. Bracing shown is for
the ]ateral support of individual web members only, The top and bottom chords are laterally braced by rigid sheathing unless noted otherwise. Additional pennanent
bracing of the overall structure is the responsibility ofthe building designer The erector is responsible for temporary bracing to insure stability during construction.
For general guidance regarding storage. handling, erection and bracing consult the following documents ANSlffPII-2002 and DSB-89 avai]abk from
Truss Plate Institute, 2]8:"oJ, Lee Street Suite 312. A]exandria. VA 223]4 / www.tpinst,org"'PH703-683-1010alsoconsulttheDeS] 1-03 available from
Wood Truss Council of America. 6300 Enterprise Lane. Madison. \\'1 53719 i www,woodrrusscomiPH 608-174-4849
~~KI
Components
a'M)t.B.(YeotnpIInv
D-APPLWD-2QQ7 -(S)-(CO)
Page 77 of 81
APPL.EWOQD
V06
GABLE
Lou-Mar Construction...Applewood Lot 2
Job
Truss
Truss Type
Stock Building Supply, Denver, CO. 80229, Scott. ThOl1llson
Job Reference 0 lonal
6.500 s Feb 52007 MiTelI.lndulltries, Inc. Men Oct 1512:02:51 2007 Page 1
,0-<;<>
,0-<;<>
112-2-1;
8x~4
,....,
~~,
Scale = 1:82.0
4
12.00 i12
1.5x4 II
I
~
I
3x4
6
3x8 'l 10 9 8
3x4 II 1.5x4 3x4 "
12-2-15 ,....,
12-2-15 3+2
Plate Offsets ()ty): r1'O-M,Edoe1. f4'Edae 0-3-81, r6'0-3-2 Edael
LOADING (psf)
TCLL 30.0
(Roof Snow--30.0)
TCDL 10.0
BCLL 0.0
BCDL 10.0
LUMBER
TOP CHORD 2X4SPF 1450F 1.3E
BOT CHORD 2 X 4 SPF 1450F 1.3E *Except*
B22X4HF Stud/Std
2 X 4 HF StudlStd *Except"
ST1 2 X 4 WW Stud/Std
SPACING 2-0-0
Plates Increase 1.15
Lumber Increase 1.15
Rep Stress lncr NO
Code IRC2003ITPI2002
CSI
TC 0.65
BC 1.00
WB 0.51
(Matrb:)
i
DEFL
Vert(LL)
Vert(TL)
Horz(TL)
in (loe)
nI.
nla
0.16 7
I!defl
nI.
nI.
nla
Ud
999
999
nla
PLATES
MT20
GRIP
1691123
Weight: 65lb
BRACING
TOP CHORD
BOT CHORD
Structural wood sheath.ing directly applied or 6-0-0 oc pur1ins.
Rigid ceiling directly applied or 10-0-0 oc bracing. Except:
5-1-0 oc bracing: 5-7
OTHERS
REACTIONS (lb/size) 1=149116-0-1,6=161/16-0-1,8=42/16-0-1,7=35&'16-0-1,9=394116-0.1,10=429/16-0.1
Max Harz 1=297(LC 5)
Max Uplift6=-157(LC 5), 9=-181(LC 5), 1~LC 5)
Max Grav 1=199(LC 5), 6=209{LC 3), 8=73(LC 4), 7=426(LC 3), 9=499(LC 2), 10=56O(LC 2)
FORCES (lb)- Maximum CompressiontMaximum Tension
TOP CHORD 1-2=-3441147, 2-~171!140, 3-4=-1601231, 4-5=-125/161,5-6=-159/208
BOT CHORD 1-1Q::()f28, 9-10=0128, 8-9=0128, 7-8=010, 5-7=-363/0, 6-7=-17/26
WEBS 3-9=-425/214,2-10=-4491478
NOTES
1) Wind: ASCE 7-02; 11Omph; h:c25ft; TCDL=6.0psf; BCDL=6.0psf; Category II; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed ;
end vertical left and right exposed; Lumber DOL:c1.00 plate grip DOL:c1.00.
2) TeLL: ASCE 7-02; Pf=30.0 psf (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for a 10.0 psf bottom chord live load oonconcurrent with any other live loads.
5) Gable requires continuous bottom chord bearing.
6) Bearing atjoint{s) 7 considers parallel to grain value usll1Q ANSIlTP11 angle to grain formula. Building designer should verify capacity of bearing
surface.
n Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 1571b uplift at joint 6, 1811b uplift at joint 9 and 448lb
uplift at joint 10.
8) Beveled plate or shim required to provide full bearing surface with truss chord at jolnt(s) 6.
9) This truss is designed in accordance with the 2OQ3lntemational Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSllTPI1.
LOAD CASE(S) Standard
... WAR!\I!\lG _ READ ALL ~OTES 0::" THIS PAGE A!\:D THE ATTACHED GE!\:ER..U TRrSS !\OTES PAGE BEFORE HA....DLI!\:G TRl:SSES
This design is based solely on parameters shown. and is for an individual building component not a trUss system Applicability of design parameters and suitabili~
for this individual component and iTS loads are the responsibility of the building designer. This truss must be installed and loaded vertically Bracing shown is for
the lateral support ofindi"idual web members only The top and bonom chords are laternlly brnced by rigid sheathing unless noted otherwise, Additional pennanent
bracing of the overall sttucturc is the responsibility ofthc building designer. The erector is responsible for temporary bracing to insure stability during construction
For general guidance regarding storage, handling, erection and bracing consult the following documents ANSIffPl 1-2002 and DSB-89 available from
Truss Plate lnstimte. 2]8 N. Lee Street. Suite 312. Alexandria, VA 223]4 / www.tpinsl.org...PH 703-683-1010 also consult the BCSI 1-03 a\'ailable from
lJ.,'ood Truss Council of ;l.,merica, 6300 Enterprise Lane. Madison. WI 53719 / www.woodtruSS.comiPH 608-274-4849
~~Kl
Components
.-.an_
D-APPLWD-2007 -(S)-(CQ)
Page 78 of 81
APPLEWOOD
V07
GABLE
Lou-Mar Construction..Applewood Lot 2
"
Job
TruS5
Truss Type
Stock Building Supply, Denver, CO. 80229, Scott Tho~50n
Job Reference onal
6.500 s Feb 52007 MlTek tldustries, Inc. Mon Oct 1S 12:0.2:53 2007 Page 1
11-1l).(1
11.1l).(1
13+15
1.5x4~14
8x8 ""
,""-,
.,~
Scale = 1:102.7
12.00 !12
3x6 ,;.
6
1.5x4
3x4 II
;
,
I
~ 1.5x4 II 9
"
~.
'"'
"0 'T
I! 3x4 = 'T
~
3x8 ,;. 15 14 13 12
1.5x4 Ii 1.5x4 II 3x4 II
13+15 1.5x4 II 1.5x4s-W.1
13-6-15 .,~
Plate Offsets ex'YI: r1:0-6-1,Edael. r6:EdQe,0-3-81 [9:0-2-9 EdQel
LOADING (psf)
TCLL 30.0
(Roof Snow=30.0)
TCDL 10.0
BCLL 0.0
BCDL 10.0
LUMBER
TOP CHORD 2X45PF 1450F 1.3E
BOT CHORD 2 X4 SPF 1450F 1.3E *Except*
B22X4 HF StudlStd
2 X 4 HF StudlStd *Except*
ST1 2 X 4 WW StudlStd, ST1 2 X 4 WW StudJStd
SPACING 2-0-0
Plates Increase 1.15
Lumber Increase 1.15
Rep Stress Incr NO
Code IRC200JlTPI2002
051
TC 0.70
BC 0.34
WB 0.46
(Matrix)
DEFl
Vert(LL)
Vert(TL)
Horz(TL)
In (Ioc)
nI.
nI.
0.09 9
I/defl
nI.
nI.
nI.
LJd
999
999
nI.
PLATCS
MT20
GRIP
1691123
Weight: 89 Ib
BRACING
TOP CHORD
BOT CHORD
OTHERS
WEBS
Structural wood sheathing directly applied or 6-0-0 DC purlins.
Rigid ceiling directly applied or 10-0-0 oc bracing. Except:
6-D-O oc bracing: 7-11
1 Rowatmidpt 5-13
REACTIONS (Ib/size) 9=14911s..s.1, 1=145118-8-1, 12=29118-8-1, 11=69/18-8-1, 10=381/18-8-1, 13=247/1s..s.1,15=441/18-8-1, 14=336118-8-1
Max Horz 1=294(LC 5)
Max Uplift9=-127(LC 5), 11::...8(LC 4), 10=-398(LC 5), 1S=-403(LC 5), 14=-376(LC 5)
Max Grav 9=193(LC 3), 1=18S(LC 2), 12=51(LC 4), 11=271(LC 5), 10=495(LC 3). 13=285(LC 2), 15=572(LC 2), 14=444(LC 2)
FORCES (Ib) - Maximum Compression/Maximum Tension
TOP CHORD 1-.2=-321f155, 2-3=-1691142, J..4=.1301364, 4-5=01369, ~861248, 6-7....10112ti2, 7-8=-97/467, 8-9=-136/147
BOT CHORD 1_15=0120,14-15=0120,13-14=0120,12_13=0120,11.12=0/0,7_11....30010, 10-11=0112, 9-1lFOf12
WEBS 8-10=-34&'439,5-13=-232/0, 2-15=-45BJ424, 3-14=-3841431
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.0psf; BCDL=6.Opsf; Category II; Exp C; endosed; C-C Exterior(2); cantilever left and right exposed;
end vertical left and right exposed; Lumber DOL=1.00 plate grip DOL=1.00.
2) TCLL: ASCE 7-02; Pf=30.0 psf (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for a 10.0 pst bottom chord live load nonconcurrent with any other live loads.
5) Gable requires continuous bottom chord bearing.
6) Bearing atjolnt(s) 11 considers parallel to grain value using ANSlfTPI1 angle to grain fonnula. Building designer should verify capacity of
bearing surface.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 127lb uplift at joint 9, Bib uplift at joint 11, 398lb
uplift at joint 10, 4031b uplift at joint 15 and 3761b uplift at joint 14.
B) Beveled plate or shim required to provide full bearing surface with truss chord at joint(s) 9, 10.
9) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlfTPI1.
LOAD CASE(S) Standard
AWAR."IrlI!\G READ ALL "lOTES O~ THIS PAGE A:"D THE ATTACHED GE:"oiERAL TRl1SS ~OTES PAGE BEFORE HA"lDLlJ'\G TRl1SSES
This design is based solely on parameters shown, and is for an individual building component not a O1.lSS system Applicability of design parameters and suitability
for this individual component and its loads are the responsibility of the building designer. This truss must be installed and loaded vertically Bracing shown is for
the lateral support of individual web members only_ The top and bottom chords are laterally braced by rigid sheathing unless noted othenvise_ Additional pennanent
bracing afthe overall structure is the responsibility oftbe building designer The erector is responsible for temporary bracing to insure stability during construction
For general guidance regarding storage_ handling. erection and bracing consult the following documents ANSlrrPII-2002 and DSB-89 available from
Truss Plate Institute, 218 !\, Lee Street. Suite 312, Alexandria, \' A 21314 i wW\\-._tpinst,org" PH 703-683-1010 also consult the DCSI 1-03 available from
Wood Truss Council of America. 6300 Enterprise Lane. Madison. WI 53719,' www.woodtTUss_com,lPH 608-274-4849
~~Hl
Compo--
lI'WOl..SfUYoompIIny
D-APPLWD-2007 -(S)-(CO)
Page 79 of 81
Job
Truss
Truss Type
Lou-Mar Construction..Applewood Lot 2
APPLEWOOO
I
V08
VALLEY
Stock Building Supply, Denver, CO. 80229, Scott ThOlJll$Dn
Job Reference 'onal
6.500 s Feb 52007 MITek hdustries, ....c. Mon Oct 1512:02:542007 Page 1
13-2-1
13-2.1
1~1o-"r
10x~1~
21-4-'
...
Scale::;: 1:104.7
12.00 112 1.5x4 II 6
3x6 I:
9
'i'
o
,;,
3x4 ij 15 3x4
14 13 12
1.5x4 II 3x4 Ii 1.5x4 4x4 II
14-10-15 I 21-4-1
14-10-15 ...
Plate Offsets (X Yl" [6-0-3-8 Edael r12'Edoe 0...3-81
, . .
LOADING (pst) SPACING ,.0-0 I eSI DEFL ;n (Ioc) ./defl Ud PLATES GRIP
TeLL 30.0
(Roof Snow--30.0) Plates Increase 1.15 Te 0.81 Vert{LL) nla nla 999 MT20 1691123
TCDl 10.0 Lumber Increase 1.15 Be 0.39 Vert(TL) nla nla 999
Rep Stress Incr NO WB 0." Horz(TL) 0.26 9 nla nla
BelL ... j
BCDL 10.0 Code IRC2003fTPl2002 (Matrix) Weight: 921b
LUMBER
TOP CHORD 2X4SPFM19*Except*
T1 2 X 4 SPF 1450F 1.3E
BOT CHORD 2X4SPF145Of1.3E
OTHERS 2 X 4 WW StudfStd *EJr;cept*
STI2X4HF StudlStd
BRACING
TOP CHORD
BOT CHORD
Structural wood sheatning directly applied or 6-0-0 oe purlins.
Rigid ceiling directly applied or 10-0-0 oc bracing. Except:
6-0-0 oc bracing: 7-11
1 Row at midpt 5-13
WEBS
REACTIONS (Ib/size) 9=82121-4-1,1=78121-4-1, 12'--41f21-4-1, 11=347/21-4-1, 13=398f21-4-1, 14=409/21-4-1, 15=354f21-4-1, 10=355121-4-1
Max Horz 1=294(LC 5)
Max Uplift9=-39(LC 5), 13=-66(LC 5), 1~LC 5), 15=-313(LC 5), 10=-367(LC 5)
Max Grav 9=102(LC 3), 1=264(LC 5), 12=73(LC 4), 11=416{LC 3). 13=508(LC 2), 14=534(LC 2). 15=46O(LC 2), 10=464{LC 3)
FORCES (Ib) - Maximwn CompressionIMaximum Tension
TOP CHORD 1-2=-41Of111, 2-3=-1601151, 3-4=-1701265, 4-5=-1/Z75, 5-6=-1611355, 6-7=-127/236, 7-8=-1671389, 8-9=-771104
BOT CHORD 1-15=0141, 14-15=0141, 13-1~41, 12-13=0141, 11-12=010, 7-11"'-381/0, 10-11=0117, 9-10=0117
WEBS 5-13=-427178,3-14=-4531509,2-15=-3831341,8-10=-3821473
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.0psf; BCDL=6.0psf; Category II; Exp C; enclosed; c;..C Exterior(2); cantilever left and right exposed;
end vertical left and right exposed; Lumber DOL=1.00 plate grip DOL=1.00,
2) TeLL: ASCE 7-02; Pf=30.0 psf (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5) Gable requires continuous bottom chord bearing.
6) Bearing atjoint(s) 11 considers parallel to grain value using ANSlrrPI1 allQle to grain fonnula. Building designer should verify capacity of
bearing surface.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 391b uplift at joint 9, 66lb uplift at joint 13, 448lb
uplift at joint 14, 3131b uplift at joint 15 and 3671b uplift at joint 10.
8) Beveled plate or shim required to provide full bearing surface with truss chord atjoint(s) 9, 10.
9) This truss is designed In accordance with the 2003lntemational Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlfTPI1.
LOAD CASE(S) Standard
... \\'ARNI~G READ ALL )'\OOTES 0)\' THIS PAGE A....D THE ATTACHED GE~ER.4.L TRI:SS ,,<OTES PAGE BEFORE HA~DLI""'G TRI:SS[S
This design is based solely on parameters shown, and is for an indi\idual building component not a truss system Applicability of design parameters and suitabilit)
for this individual component and its loads are the responsibilit), of the building designer, This truss must be installed and loaded vertically Bracing shoWTI is for
the lateral support of individual web members only. The top and bottom chords are laterally braced by rigid sheathing unless noted otherv.'ise Additional permanent
bracing of the overall structure is the responsibility of the building designer, The erector is responsible for temporary bracing to insure stabilit), during construction
For general h'llidance regarding storage. handling, erection and bracing consult the following documents A:"ISJffPI1-2002 and DSB-89 available from
Truss Plate Institute, 2 I 8 K Lee Street, Suite 3 I 2, Alexandria. V A 223 J 4 www.tpinstorg..PH 703-683-] 0] 0 also consult the RCSI 1-03 available from
Wood Truss Council of America 6300 Enterprise Lane. Madison, W] 53719 www.woodtruss.com...PH 608.274-4849
~.
Components
'-''''''''"n_
D-APPLWD-2007 -(S)-(CO)
Page 80 of 81
[I][l:]glC][KJ Components"
aWOt.SElEYcompany
GENERAL TRUSS NOTES
Failure to read and follow these notes could cause
property damage or personal injury.
1. Do not cut or alter trusses without prior written approval from a
Licensed Professional Engineer.
2. Do not place or install trusses in any location that will cause the
moisture content of the wood to exceed 19% and/or cause corrosion
of the connector plates.
3. Do not load trusses with stacks of construction materials.
4. Use extreme care while handling and installing trusses.
5. The attached truss designs are not applicable for use with fire
retardant lumber or preservative treated lumber.
6. Provide copies of all pages to the building designer, erection
supervisor, property owner, building official and all other interested
parties.
7. Load transfer connections including truss anchors are to be
specified by others unless otherwise noted on the truss designs.
TRUSS DRAWING SYMBOLS
Indicates location of required
continuous lateral bracing
Lateral Bracing Location Bearing Location
D-APPLWD-2007-(S)-(CO) Page 81 of 81
APPLEWOOD
TOO
SPECIAL
Lou-Mar Construction...Applewood Lot 2
Job
Truss
Truss Type
Stoc:k Building Supply, Denver, CO. 80229, Scott Tho""son
Job Reference 0 lonal
6.500 $ Feb 52007 MITek rtdustrill$, Inc. Man Oct 1512:02:18 2007 Page 1
~...
....,
11-5-5 17-1-6 "'..
..., ..., 6x6 'l 6-1-14
B.OO [12
5
3x6 'l
2U<
~>2
...."
,....
33-"
,....
Scale = 1:90.6
J
:;;
::i
,
3x6 .:.:.--
3x4~
1.5x4 '\'\
6x8 -::::
12
5x12 =
11
5x8 =
4x6.::::
3x8 II
M 19
'cb eej"
'or.,. N
C>
"
ldi
.;
Plate Offsets (XYl:
LOADING (pst)
TCLL 30.0
(Roof Sn0w=30.0)
TCDL 10.0
BCLL 0.0
SCDL 10.0
LUMBER
TOP CHORD 2X4SPF1450F1.3E
BOT CHORD 2X4SPF1450F1.3E
WEBS 2 X 4 WN StudlStd *Except*
W4 2 X 4 HF Stud/Std, W2 2 X 4 HF Stud/Std, W1 2 X 4 HF StudlStd
W32X4HFStudlStd
14 13
5x8 = 6x14MT2OH= 4.00112
8-S-4 I 17-1..a 171?"" 23-3-4 126-6-6
8-S-4 8-5-4 0-1-12 6-0-(1 3-3-2
[1:EdQeO-3-S1 rS'0-5-4.0-2-81. (10'0-0-13.0-0-141. r10'0-2.12.Edae1. [13'0-7-0,0-2-61, r14:0-3-SO-3-01
2.B3[R
33-..
7-2-14
SPACING 2-0-0
Plates Increase 1.15
Lumberlnerease 1.15
RepStress Iner NO
Code IRC2003ITPI2002
C5I
TC 0.66
BC 0.52
we 0.84
(Matrix)
DEFL
Vert(LL)
Vort(TL)
Horz(TL)
;"
-0.12
-ll.34
0.05
(Ioe)
1-14
1-14
10
IJdefl
>999
>615
01,
Lid
240
180
01,
PLATES
MT20
MT20H
GRIP
169/123
1391108
Weight: 152lb
BRACING
TOP CHORD
BOT CHORD
Structural wood sheathing directly applied or 5-3-6 oe purlins.
Rigid ceiling directly applied or 6-0-0 oe bracing, Except:
10-0-0 oe bracing: 10-11.
1 Row at midpt
3-13,5-13,7-13
WEBS
WEDGE
Left: 2 X 4 WN Stud/Std, Right: 2 X 4 WN StOOiStd
REACTIONS (lbJsize) 1=523IMechanical, 1tF46BIMeehanical. 13=237410-3-12 (Input: 0-3-8)
Max Horz 1=18(LC 5)
Max Uplift1=-165(LC 5), 10=-146(LC 5), 1J=.-S58(LC 5)
Max Grav 1=899(LC 2), 10:=695(LC 3), 1J:=2374(LC 1)
FORCES (Ib) - Maximum Compression/Maximum Tension
TOP CHORD 1_2=-11091251,2-3=-7671313,3-4=0/590,4-5=01685,5-6=0/793,6-7:::01464, 7-8=-157/255, 8-~7501102, 9-10=-1257/259
BOT CHORD 1_14=-1651806,13-14=-3501268,12_13=-2281335,11_12=-77/493,10-11=-14011002
WEBS 2_14==-5301363,3_14==-2071671,3-13=-9461458, 5-13=-11211241, 7.13=-97~312, 7-12==0/538, 8-12=-591/191, 8-11=-37/460, 9-11=-4581315
NOTES
1) Wind: ASCE 7-02; 11Omph: h--25ft; TCDL=ti.Opsf; BCDL=ti.Opsf; Category II; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed;
end vertical left ami right exposed; Lumber DOL=1.oo plate grip DOL=1.oo.
2) TCLL: ASCE 7-02; Pf=3O.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for a 10.0 psf bottom chord live load noncor\CUlTent with any other live loads.
5) All plates are MT20 plates unless otherwise irldieated.
6) WARNING: Required bearing size at jolnt(s) 13 greater than input bearing size.
7) Refer to glrder(s) for truss to truss connections.
S) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 165lb uplift at joint 1, 146lb uplift at joint 10 and 858
Ib uplift at joint 13.
9) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and RS02.10.2 and referenced standard
ANSIITPI1.
LOAD CASE(S) Standard
... WARNI:'\"G READ ALL NOTES O"lrrl THIS PAGE A:oiD THE ATTACHED GE!\ER4..L TRl~SS "IrrlOTES PAGE BEFORE HA!\DLl"lrrlG TRl:SSES
This design is based solely on parameters shown, and is for an individual building component not a truss system. Applicability of design parameters and suitability
for this individual component and its loads are the responsibility of the building designer This truss must be installed and loaded vertically. Bracing shown is for
the lateral suppon of individual web members only. The top and bottom chords are laterally braced by rigid sheathing unless noted otherwise. Additional pennanent
bracing of the overall structure is the responsibility of the building designer The erector is responsible for temporary bracing to insure stability during construction
For general guidance regarding storage, handling. erection and bracing consult the following documents A;"iSlffPII-2002 and DSB-89 available from
Truss Plate Institute, 218 N. Lee Street. Suite 312, Alexandria. VA 22314 ...- wvo"w.tpinsl.org"- PH 703-683-1010 also consult the BCSI 1-03 available from
\\'ood Truss Council of America. 6300 Enterprise Lane. Madison. WI 53719 "-www.woodtruss com"-PH 608-274-4849
~~Hl
Components
.-.an""""""
D~APPL WD~2007 ~(S)~(CO)
Page 54 of 81
T11
HIP
Lou-Mar Construction..Applewood Lot 2
~
.APPLEWOOD
Truss
.TnlssType
Stock Building Supply, Denver, CO. 80229, Scott Th~on
JobRefe,-.nce 0 onal
6.500 5 FBb 52007 MITek ~dustrles, Inc. Man Oct 1S 12:02:22 2007 Page 1
~2~
~2.
8-1." 13-4-6
3-11.1 4x8'l 5-2-11
18-7-'
5-2.11
23->0
5-2-2
28-11-6
5-2-2
34-2-12
...
35-6-1f
,....
8.00 f12
L
17
5x5 :::::
8-1-11
8-'-11
3
3x4 =
.
6x8 -:::..
Scale = 1:90.4
.
o
~
'-
16 1. ,. 13 12 11 ax8 :::-
4x8 ::::: 3x4 ::::: 3x4 ::::: 3x6 ::::: 3x4 :::::
,.... 3x4 ='8-7-' ,.... 34-2-12
5-2-11 5-2-11 ,.... 7-16-7
Plate Offsets ex Y): [3:0-4-0.0-1-91. TS:G-4-8.0-1-121. r9:0-0-15,EdQel
LOADING (pst)
Tell 30.0
(Roof Snow=JO.O)
reDL 10.0
BelL 0.0
aCDl 10.0
LUMBER
TOP CHORD 2X4SPF145OF1.3E
BOT CHORD 2 X 4 SPF 1450F 1.3E
WEBS 2 X 4 HF StudlStd .Except*
W72X4WWStudlStd
SPACING 2-0-0
Plates Increase 1.15
Lumberlncrease 1.15
Rep Stress Incr NO
Code IRC2003ITPI2002
C5I
TC 0.89
Be 0.74
WB 0.80
(Matrix)
DEFL
Vert(LL)
Vert(TL)
Horz(TL)
in (Ioc)
-0.1411-13
-0.3511-13
0.12 9
lIdefl
>999
>999
01,
Lid
240
180
01,
PLATES
MT20
GRIP
169/123
Weight: 200 Ib
WEDGE
Right: 2 X B OF 1950F 1.7E
REACTIONS (Ib/size) 17=16901Mechanical,9=1821/O..>8
Max Horz 17=-105(LC 5)
Max Uplift17=-620(LC 5), 9=-729(LC 5)
Max Grav 17=1884(LC 2), 9=2291(LC 3)
BRACING
TOP CHORD
BOT CHORD
WEBS
Structural wood sheathing directly applied or 3-3-4 DC purlins, except end
verticals, and 2-0-0 oc purlins (5-0-9 max.l: 3-5.
Rigid ceiling directly applied or 10-0-0 oc bracing, Except:
8-11-0 oc bracing: 9-11.
1 Row at midpt 4-16,4-14,5-14,7-13,2-17
FORCES (Ib) _ Maximum Compression/Maximum Tension
TOP CHORD 1_2=-1671279,2_3=-13791720,3-4=-10861672,4-5=-1514/787,5-6=-20901859, &.7=-2106J824, 7-8=-28361942, 8-9=-3166/910, 9-10=01ti5,
1-17=-242/248
BOT CHORD 16-17=0/818,15-16=-10111514,14-15=-10111514,13-14=-117/1629, 12-13=-35012069, 11-12=-35012069, 9-11=-547/2416
WEBS 2_16=-81768,3-16=-156/370.4-16=-1001/268,4-14=-1081311,5-14=-2631204, 5-13=-239/748, 7-13=-7591399, 7-11=-1241464, 8-11=-325/265,
2-17=-1743/477
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.0psf; BCDL=6.0pst; Category II; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed ;
end vertical left and right exposed; Lumber DOL=1.oo plate grip OQL=1.oo.
2) TCLL: ASCE 7-02; Pf--30.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 16.0 pst or 1.00 times flat roof load of 30.0 pst on ovemangs non-concurrent with
other live loads.
5) Provide adequate drainage to prevent water pondlng.
6) This truss has been designed fora 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Refer to glrder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to bearing plate capable ofwithstandlng 620 Ib uplift at joint 17 and 729lb uplift at joint 9.
9) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and RB02.10.2 and referenced standard
ANSlfTPI1.
10) Design assumes 4x2 (flat orientation) pUrlins at oc spacing indicated, fastened to truss TC w/2-1Od nails.
LOAD CASE(S) Standard
... WARlIro,lNG READ ALL ~OTES 0,," THIS PAGE AND THE ATTACHED GE"'ERAL TRlSS NOTES PAGE BEFORE HA!'\DLI""lG TRlSSES
This design is based solely on parameters shol'>'Il, and is for an individual building component not II truss system. Applicability of design parameters and suitabilil)
for this individual component and its loads are the responsibility of the building designer This truss must be installed and loaded vertically Bra<;:ing shown is for
the lateral support ofindividual web members only. The top and bottom chords are ]aterally braced by rigid sheathing uniess noted otherwise. Additional permanent
bracing of the o,'erall structUre is the responsibilil)' of the building designer. The erector is responsible for temporlll)' bracing to insure stability during construction
For general guidance regarding storage. handling, erection and bracing consult the following documents ANSlfTPI 1-2002 and DSB-89 available from
Tmss Plate Institute. 218 N. Lee Street. Suite 312. Alexandria V A 223]4 i W"iW ,tpinsl.org i PH 703-683-] 0 I 0 also consult the BCSI 1-03 available from
\\'ood Truss Council of America, 6300 Enterprise Lane. Madison. \\,1 537]9/ v.'w"",woodtruss.com / PH 608_274-4849
~1CI1KJ
Components
aVll'OlJB.ncompan~
D-APPLWD-2007 -(8)-(CO)
Page 56 of 81
Job
Truss
Truss Type
IQly
Lou-Mar Construction .Applewood Lot 2
APPlEWOOD
T12
MONO HIP
l'
Job Reference 0 . onal
6.500 sFeb 52007MITek ndustries, nc. Mon Oct 1512:02:232007 Page 1
Stock Building Supply, Denver, CO. B0229, Scott Tho""son
1-8-12
1-8-12
8-2-1
...
14-1-6
&>5
21..{l.10
&>5
27.5-15
&>5
34-2-12
...13
Scale = 1 :60.5
B.OO I'f2
6x10 =
8x8 = 2
Bd=
3
4x4 =
3x6 =
4 5
3x4 =
4x4 =
6 7
8x8 =
B
3x8 Ii
9
11,
~~~
11l
~
..;
17
3x4 I:
10x10 =
16
15
14
13
4x4 =
12
11
10
4x8 =
5x5 = 5x12 WB=
6x14 MT20H WB:;;::;: ax8 =
11-8-12
1-8-12
....
0<>-"
17-1D-O
0<>-"
25-10-10 34-2.12
0<>-" ....,
DEFL in (Ioc) I/defl Ud PLATES GRIP
Vert(LL) -0.41 13 >999 2'" MT20 169/123
Vert(TL) -0.7313-15 >557 180 MT20H 1481108
Horz(TL) 0.22 10 nI. nI.
Weight: 1411b
Plate Offsets IX. Yl: r1'Edae.o-1.141. r2:D-6-0,o-1-81
LOADING (pst)
TelL 30.0
(Roof Snow=30.0)
reDL 10.0
BeLL 0.0
aCDl 10.0
LUMBER
TOP CHORD 2X4SPF1450F1.3E
BOT CHORD 2 X 4 SPF M 19 *Except*
822 X4 SPF 1450F 1.3E
2 X 4 WW StudlStd *Except*
W8 2 X4SPF 1450F 1.3E, W2 2 X4 SPF 1450F 1.3E, W2 2 X 4 SPF 1450F 1.3E
W3 2 X 4 HF StudfStd
SPACING 2-0-0
Plates Increase 1.15
Lumber Increase 1.15
Rep Stress Incr NO
Code IRC2003ITPI2002
I
I
I
CSI
TC 0.88
BC 1.00
WB 0.99
(Matrix)
WEBS
BRACING
TOP CHORD
BOT CHORD
WEBS
JOINTS
Structural wood sheathing directly applied or 5-8-3 oc purlins, except end
verticals, and 2-0-0 oc purlins (2-2-0 max.): 2-9.
Rigid ceiling directly applied or 1-4-12 oc bracing.
1 Row atmidpt 3-16,5-15,6-11.8-10,1-17
1 Brace at Jt(s): 9
REACTIONS (Ib/size) 1lF1697/Mechanlcal,17=1697/Mechanical
Max Harz 17=8(LC 5)
Max Uplift10=-675(LC 5), 17=-665(LC 5)
Max Grav 10=2203(LC 3), 17=2067(LC 3)
FORCES (Ib). Maximum Compression/Maximum Tension
TOP CHORD 1-2=-845/352,2-3=.8041355,3-4=-367711209,4-5=-3677/1209,5-6=4478/1447, 6-7=-3325r'109S, 7-~332511095, 8-9=-1031128, 9-10=-3441165,
1-17=-20841648
BOT CHORD 16-17=0169,15-16=-94313342,14-15=-1301/4488,13-14=-130114488, 12-13=-1255.14344, 11.12=-125514344, 10-11=-80812925
WEBS 2_16=-48/138,3-16=-2999/940,3-15=-165/923,5-15=-1067/392,5-13=-151144, 6-13=0/252, 6-11=-13411481, 8-11=-22511101, 8-10=-333111045,
1-16=-52211934
NOTES
1) Wind: ASCE 7"'()2; 11Omph; h--25fl; TCDl=6.Opsf; BCDl=6.Opsf; Category II; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed;
end vertical left and right exposed; lumber DOl=1.oo plate grip DOl=1.oo.
2) TCll: AscE 7-02; Pf=30.0 psf (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) Provide adequate drainage to prevent water pending.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) All plates are MT20 plates unless otherwise indicated.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 6751b uplift at joint 10 and 665 Ib uplift at joint 17.
9) This truss is designed in ac{;()rdance with the 2003lntemational Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlfTPI1.
10) Design assumes 4x2 {flat orientation) purlins at oc spacing indicated, fastened to truss TC wi 2-1Od nails.
lOAD CA5E(S) standard
.A. WAR~I'\G READ ALL "IlOTES 0'\ THIS PAGE Al'o'O THE ATTACHED GE;'I.:ERA.L TReSS "iOTES PAGE BEFORE HA!'\DLI;'I.:G TRl"SSES
This design is based solely on parameters shown. and is for an individual building component not a truss system. Applicability of design parameters and suitabilit)
for this individual component and its loads are the responsibility of the building designer, This truss must be installed and loaded vertically, Bracing shown is for
the lateral support of individual web members only, The top and bottom chords are laterally braced by rigid sheathing unless noted othen'..ise_ Additional permanent
bracing afthe overall structure is the responsibility ofthe building designer, The erector i~ n;~ponsible for temporary bracing to insure stabilit), during construction
For general guidance regarding storage_ handling. erection and bracing consult the following documents ANSlrrPII-2002 and DSft..89 available rrom
Truss Plale Institute, 218 N, Lee Street, Suite 3] 2. Alexandria. VA 223]4 i www.rpinst.org;.PH 703-683-10 I 0 also consult the BeST 1-03 available from
Wood Truss Council of America. 6300 Enterprise Lane, Madison. WI 53719 i www,woodtn/ss_com/PH 608-174-4849
m1gfCIKT
Components
.-..nn_
D-APPL WD-2007 -(S)-(CO)
Page 57 of 81
Tl1.lllS Tl1.lssType
713 HIP
11-2-12 18-&-12
,..- ,..-
5x8 =
.;, 8.00 112 5x8 =
'1 2
3
1
i
I
~ ~ T W2 W6
lH
j
15 14 1312
3x4 il 6x8 = 4x8 =
1.5x4 II
,..12 11-2-12 18-&-12
,..12 ,..- ,..-
Lou-Mar Construction..Applewood Lot 2
l'
Job Referenee lional
6.500 5 Feb 52007 MITek kldustries, Ine. Mon Oct 1512:02;25 2007 Page 1
2&-2-12 =12
,..- ,..-
3x4 I'
4x6 = 3x8 =
4 5 6
W6
Jt2l12
"""
Scale = 1 :65.5
8x8 =
7
."
, .,
::\..1
11 10 9 8
5x8 = 3x8 = 6x8 = 4x4
2&-2-12 34-2_12
,..- ...
DEFL in (Ioc) I/defl Ud PLATES GRlP
Vert(LL) -0.2311-13 >999 240 MT2ll 1691123
Vert(TL) -0.4511-13 >907 180
Horz(TL) 0.14 8 nia nia
Plate Offsets (X,Y): [2:0-4-0,0-1-91. [6:0-3-8,0-1-81. f7;0-3-8,Ecklel. [8: EdQe,o-3-81, r9:0-3-8,o-3-01
LOADING (psf)
TCLL 30.0
(Roof Snow=30.0)
TCDL 10.0
BCLL 0.0
BCDL 10.0
LUMBER
TOP CHORD 2X6SPF 2100F 1.8E*Except*
T1 2 X 4 SPF 1450F DE
BOTCHORD 2X4SPF145OF1.3E
WEBS 2 X 4 WW Stud/Std *Except*
W2 2 X 4 HF Stud/Std, W6 2 X 4 HF Stud/Std, W6 2 X 4 HF StudlStd
W7 2X4SPF 1450F 1.3E, W32X4HF Stud/Std, W82X4SPF 1450F 1.3E
SPACING 2-0-0
Plateslnaease 1.15
Lumberlncrease 1.15
Rep Stress Incr NO
Code IRC2OO3ITPI2002
cso
TC 0.91
BC 0.74
WB 0.89
(Matrix)
REACTIONS (Ib/size) 15=1697/Mechanical,8=1697/Mechanical
Max Horz 15=19(LC 5)
Max Uplift15=-655(LC 5), 8=-675(LC 5)
Max Grav 15=19OD(LC 3), 8=2189(LC 3)
Weight: 1741b
BRACING
TOP CHORO
BOT CHORD
WEBS
Structural wood sheathing directly applied or 5--1-1 oc pUrlins, except end
verticals, and 2-0-0 oc purlins (5-0-7 max.): 2-7.
Rigid ceiling directly applied or ~oc bracing.
1 Row at midpt 6-9,7-9,1-15, 7-a
2 Rows at 113 pts 3-14
1 Brace at Jt(s):7
JOINTS
FORCES (Ib) - Maximum CompressionIMaximum Tension
TOP CHORD 1_2=-1428/569,2_3=-12091543,3-4=-3492/1219,4-5=-349211219,5--6=-349211219, 6-7=-25741929, 1.15=-18861667, 7-8=-2106/724
BOT CHORD 14-15=-4148,13-14=-84213102,12.13=-84213102,11.12=-84213102, 10-11=-66212574, 9-10=-66212574, 8-9=01113
WEBS 2_14=-331337,3-14=-23231698,3-13=01312,3-11=-134/480,4-11=-7881374, 6-11;:;..35611129, 6-9=-1575/622, 7-9=-94013051, 1-14=-43611659
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.0pst; BCDL=6.0pst; Category 11; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed ;
end vertical left and right exposed; Lumber 001..=1.00 plate grip 001..=1.00.
2) TCLL: ASCE 7-02; Pf--30.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) Provide adequate drainage to prevent water pending.
5) this truss has been designed for a 10.0 pst bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable ofwithstanding 655lb uplift at joint 15 and 6751b uplift at joint 8.
8) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlfTPI1.
9) Design assumes 4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/2-1Od nails.
LOAD CASE(S) Standard
~!CIKI
Components
aWIJUiifUYOOIl'lPlIrIY
... WAR~I]\G READ ALL ~OTES 0," THIS PAGE A"D THE ATTACHED GE!\ERAL TRtlSS ,"OTES PAGE BEFORE HA~DLlNG TRt:SSES
This design is based solely on parameters shOl>m, and is for an individual building component not a truss system. Applicability of design parameters and suilabilit)
for this individual component and its loads are the responsibiht}' of the building designer. This truss must be installed and loaded vertically Bracing shown is for
the lateral support of individual web members only. The top and bottom chords are laterally braced by rigid sheathing unless noted othervdse, Additional permanent
bracing of the overall structure is the responsibility of the building designer. The erector is responsible for temporary bracing to insure stability during construction
For general guidance regarding storage. handling. erection and bracing consult the following documents ANSIfTPI 1-2002 and DSB-89 available from
Truss Plate lnstitute. 218 N. Lee Street. Suite 312. Alexandria. VA 22314 iwww.tpins1.orgi PH 70_3~683-101O also consult the BCSII-03 available from
Wood Truss Councll of America, 6300 Enterpnse Lane. MadIson, \1-,1 53719,' W\\'w.woodtruss.com i PH 608-274-4849
D~APPL WD~2007 ~(S)~(CO)
Page 58 of 81
APPLEWOOD
T14
HIP
lou-Mar ConstructionnApplewood lot 2
Job
Truss
Truss Type
Stock Building Supply, Denver, CO. 80229, Scott ThorTllson
Job Reference 0 'om"
6.5DOsFeb 52007MrTek ttdustries, Inc. Mon0ct1512:02:262D07 Paget
3-0-,
3-0-,
8.00 [f2
J
"i~
I : l
I ,
17
5x5 =
,..."
,..."
,..."
2-8-10
12-2-12
...
18-8-12
...
25-2-12
...
31-8-12
...
34-2.12
,-&<I
6x10 =
Scale = 1:72.1
5x8 =
3
4x4 =
4
3x4 =
5
3x8 =
.
4x6 =
7
8
8x8 =
4 9
..~
;j;~
,;,
,.
5x8 =
15
14
1312
4x6 =
4x8 =
11
10
3x8 = 4x4 =
8x8 = 3x6
14-4-12
.....
Plate Offsets (X Y\' r3'0-6-0 0-1-81 r8'0-4-120-2-01 r9'0-3-8 Edoel
="
.....
31-8-12
.....
34-2-12
,-&<I
, . .
LOADING (pst) SPACING 2-0-0 CSI OEFL in (Ice) l/defl Ud PLATES GRIP
TCLL 30.0
(Roof Snow--30.0) Plates Increase 1.15 TC 0.87 Vert(LL) -0.1912-14 >999 240 MT20 1691123
rCDL 10.0 Lumber Increase 1.15 BC 0.75 Vert(TI.1 -0.4314-16 >945 180
BCLL 0.0 Rep Stress Incr NO WB 0.94 Horz(TL) 0.14 10 nI. nI.
BCDL 10.0 Code IRC2003/TPI2002 (Matrix) Weight: 172 Ib
LUMBER
TOP CHORD 2X4SPF 1450F 1.3E
BOT CHORD 2X4SPF1450F1.3E
WEBS 2 X 4 WW StuQ'Std *Except*
W3 2 X 4 HF Stud/Std, W1 2 X 4 HF Stud/Std, W1 2 X 4 HF StudlStd
W3 2 X 4 HF Stud/Std, WT 2 X 4 HF Stud/Std, W6 2 X 4 HF $tudlStd
REACTIONS (Ib/slze) 17=16Q7/Mechanical,10=1697/Mechanical
Max Horz 17=19(LC 5)
Max Uplift17=-646(LC 5), 10=-663(LC 5)
Max Grav 17=2199(lC 2), 10=2165(LC 3)
BRACING
TOP CHORD
BOT CHORD
WEBS
Structural wood sheathing directly applied or 4-0-10 oc purlins, except end
verticals, and 2-0-0oc purllns (3-4-15 max.): 3-8.
Rigid ceiling directly applied or 6-0-0 oc bracing.
1 Row at midpt 4-16,2-17,9-10
2 Rows at 1/3 pts 7-11
FORCES (Ib) - Maximum CompressionlMaximum Tension
TOP CHORD 1_2=-1631199,2_3=-1833/693,3-4=-1529/645,4-5=-2667/979,5-6=-23911897, 6-7=-2391/897, 7-8=-7161395, 8--9=-8431419, 1-17=-224/184,
9-10=-2174/587
BOT CHORD 16-17=-224/1112, 15-16=-630r'2567, 14-15=--63012567, 13-14=-69212752, 12.13=-69212752, 11-12=-50712153, 10-11=-21131
WEBS 2-16=-153/973,3.16=-119/401,4-16=-15601484,4-14=01378,5-14=-2161119, 5-12=-673/272, 7-12=-1281783, 7-11=-20931665, 8-11=-1271117,
2-17=-2201/556,9-11=-45411851
NOTES
1) Wind: A$CE 7-02; 11Omph; h=25ft; TCDL=6.0psf; BCDL=6.0psf: Category II; Exp C; enclosed; C-C Exterior(2); cantllever left and right exposed;
end vertical left and right exposed; Lumber DOL=1.00 plate grip DOL=1.00.
2) TCLl: ASCE 7-02; pf--30.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced SI'tOW loads have been considered for this design.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 pst bottom chord live load noncorlCurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by otoors) of truss to bearing plate capable of withstanding 646lb uplift at joint 17 and 663lb uplift at joint 10.
8) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 al\d referenced standard
ANSlfTPI1.
9) Design assumes 4x2 (flat orientation) purlins at oc spacing Indicated, fastened to trussTC wf 2-1Od nails.
LOAD CA$E(S) Standard
... WARNIlIrlG READ ALL !\lOTES 0,," THIS PAGE A:"riD THE ATTACHED GE:"riER4.L TRl:SS NOTES PAGE BEFORE HA~DLl1\'G TRl:SSES
This design is based soleiy on parameters shown. and is for an individual building component not a truss system Applicability of design parameters and suitability
for this individual component and its loads are the responsibility of the building designer, This truss must be installed and loaded vertically. Bracing shown is for
the lateral support of individual web members only. The top and bottom chords are laterallv braced by rigid sheathing unless noted otherwise Additional pennanent
bracing of tile overall structure is the responsibiHty of the building designer. 'The ere(;tor is responsible for temporary bracing to insure stability during construction
For general guidance regarding storage. handling, erection and bracing consult the following documents ANSIrrPII-2002 and DSB-89 available from
Truss Plate lnstitute, 218 N. Lee Street, Suite 312. Alexandria, VA 223 I 4 i v.ww,tpinsl.org;' PH 703-683~ 10 I 0 aha consult the BCSI I-tl3 a\ailable from
Wood Truss Council of America. 6300 Enterprise Lane. Madison. WI 53719 i WWv.'.woodtruss,com;' PH 608-274-4849
~~[KJ
CD_POnents
.........-
D-APPL WD-2007 -(S)-(CO)
Page 59 of 81
APPLEWOOD
SPECIAL
Lou-Mar Construction...Applewood Lot 2
Job
,Truss
I
T15
Truss Type
Job Referent:e onal
Stock Building Supply. Denver, CO. 80229, Sl:ottTholTl'son 6.500 s Feb 52007 MlTek ndustries, ne. Man Oct 1512:02:28 2007 Page 1
~ .....
~ .....
12... 17-10-15 23+13 _12 34-2-12
.,~ 5-10-15 5-10-15 5-10-15 ~
8x8 = 4x4 =
5x8 =
3x4 = 4x4 =
. 5 . 7 .
6x6 -
Scale = 1:79.2
4x8 =
..
~.
~
..
roo '12
>Ii
.Ii
I ,
11
2
~
~
,~ cb
i~
r
,.
3x4 !I
15
5x12 =
"
5x12 =
13 12
4x4 =
3x6 =
11
6x8 =
10
4x4 II
Plate Offsets (X.Y):
LOADING (psf)
TCLL 30.0
(Roof Snow=30.0)
TCDL 10.0
BCLL 0.0
BCDL 10.0
LUMBER
TOP CHORD 2 X4 SPF 1450F 1.3E *Except*
T3 2 X 6 SPF 210DF 1.8E
BOTCHORD 2X4SPF145OF1.3E
WEBS 2 X 4 HF StudlStd *Except"
W92X4WWStudlStd, W52X4WWStudfStd, W112X4SPF 1450F 1.3E
W8 2 X 4 SPF 1450F 1.3E
4-6-4 12-0-0 20-10-6 29--8-12
4-6-4 7.5-12 S-10-6 S-1D-6
r2'0-4-8,M-121, r4:0.s.5.Edoel. r6'0.2-0.Edclel. r8:0-4-12 0.2-01. r9'0.3-8.Edael f10'Edoe,o.3-81. r14'0.6-0,0.3-01
34-2-12
~
SPACING 2-0-0
Plates Ina-ease 1.15
Lwnberlncrease 1.15
Rep Stress Ina- NO
Code IRC2003ITP12002
CSI
TC 0.68
BC 0.68
WB 0.93
(Matrix)
DEFL
Vert(LL)
Vert(TL)
Horz(TL)
in (Ioc)
-0.1513-14
-0.39 11-13
0.11 10
l/defl
>999
>999
nI.
Ud
240
180
nI.
PLATES
MT20
GRIP
169/123
Weight: 188lb
BRACING
TOP CHORD
Structural wood sheathing directly applied or 4-8-10 DC purl ins, except end
verticals, and 2-0-0 DC purlins(4-().12 mal: 2.3,4-8.
Rigid ceiling directly applied or 6-0-0 oc bracing.
1 Row at midpt 3-15,5-14,5-13,7-11,9-10
BOT CHORD
WEBS
REACTIONS (lb/size) 16=1697/Mechanical,10=1697/Mechanical
Max Horz 16=19(LC 5)
Max Uplift16=-639(LC 5), 10=>-65O(LC 5)
Max Grav 16=2181(LC 2), 10=202O(LC 3)
FORCES (lb) - Maximum Compression/Maximum Tension
TOP CHORD 1-2=-1780/606,2-3=-13851578,3-4=-25871948,4-5=-2107/858,5-6=-21231861, 6-7=-21231861, 7-8=-9511532, 8-~12381552, 1-16=-21391654,
9-10=>-19921677
BOT CHORD 15-16=0150,14-15:-57012334,13-14=-50512273,12-13=-40111905,11-12--40111905,10.11=-21120
WEBS 2-15"'-97/481,3-15:-16061504,3-14=-4831300,4-14"'-2691827,5-14=-5501129, 5-1J=.4401213, 7-13=-93/638, 7-11=-16121503, 8-11=-491237,
1-15"'-38411681,9-11=-35811535
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.0psf; BCDL=6.0psf; Category II; Exp C; enclosed; C-C Exterlor(2); cantilever left and right exposed ;
end vertical left and right exposed; Lumber DOL=1.00 plate grip DOL=1.00.
2) TCLL: ASCE 7-02; Pf--30.0 psf (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) Provide adequate drainage to prevent water pending.
5) This truss has been designed for a 10.0 psf bottom cnord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mecnanlcal connection (by others) of truss to bearing plate capable of withstanding 6391b uplift at joint 16 and 650 Ib uplift at joint 10.
8) This truss Is designed in accordance with the 2003lntemational Residential Code sections R502.11.1 and R802.10.2 aOO referenced standard
ANSllTPI1.
9) Design assumes 4x2 (flat orientation) purl ins at oc spacing indicated, fastened to truss TC w/2-1Od nails.
LOAD CASE(S) Standard
":WARNI~G READ ALL NOTES O~ THIS PAGE A:\"D THE ATTACHED GE)'o;ER~L TRt-SS NOTES PAGE BEFORE HAl\DLI"lG TRt:SSES
This design is based solely on parameters shown, and is for an indi\~dual building component not a truss system, Applicability of design parameters and suitability
for this individual component and its loads are the reSJXlnsibility of the building designer, This truss must be installed and loaded vertically Bracing shov,Tl is for
the lateral support of individual web members only. The top and bottom chords are laterally braced by rigid sheathing unless noted othef\\'ise Additional permanent
bracing ufthe overall structure is the responsibility of the building designer. The erector is responsible for temporaJ}' bracing 10 insure stability during construction
For general guidance regarding storage. handling, erection and bracing consult the following document, A)'o;SIffP11-2002 and DSB-!I9 available from
Truss Plate Institute, 2 I 8 N, Lee Street. Suite:3] 2. Alexandria, V A 223] 4 i www.tpinSl-org i PH 703-683-] OJ 0 also consult the BCSI 1-03 available from
Wood Truss Council of America, 6300 Enterprise Lane. Madison. W] 537]9 i www.woodtruss.com.PH 608-274-4849
M1~lCIBl
Components
alJM)Ulll.n'company
D-APPL WD-2007 -(S)-(CO)
Page 60 of 81
Job
TN"
APPLEWOOD
T16
Stock Building SupPly, Denver, CO. 80229, Scott Th~BDn
2-6-4 &9-8
2-6-4 4-3-4
Truss Type
Lou-Mar Construction .Applewood Lot 2
SPECIAL
Job Reference D 'onal
6.500 s Feb 52001 MiTek ndustriBs, Inc. Moll Oct 1S 12:02:29 2007 Page 1
,_ I 18-6-15 23-1-13 27.a.12 30-,,, 34-2.12
T-NI ...15 "'15 ...15 ~'4 >+12
8x8 = Scale = 1 :85.8
3x4 = 3x4 = 5x5 =
. 5 6 7
Jl .+[12 2
~ 6)(6=
~r
11j~
6x8 ::::
,.
3x4 II
17
6x6 =
12-6-4 I 6-9-8
,... ....
5x12 =
~
'l'
'"
:c
~,
.n:
16 15 ,. 13 12 11
6xll = 3x6 = 3)(4 = 5x8 =
3x8 = 3x4 =
,- 20-,,, 27-&-12
7.2-8 M" M"
1.
6x6 =
34-2-12
0.0<>
PLATES
MT20
GRIP
169/123
Plate Offsets ex.Y); r2:o-5-S,EdQel [3:0-7-8.0..2-41, r4:o-5-5.Ed!:lel
LOADING (pst)
TelL 30.0
(Roof Snow:30.0)
TCDL 10.0
Bell 0.0
SCOt 10.0
LUMBER
TOP CHORD 2 X 4 SPF 1450F 1.3E *Except'
T3 2 X 6 SPF 2100F 1.8E
BOT CHORD 2 X 4 SPF 1450f 1.3E
WEBS 2 X 4 HF Stud/Std *Except"
W112X4WWStudlStd, W102X4SPF 1450F 1.3E, W92X4WWStudlStd
W13 2 X 4 WW Stud/Std, W8 2 X 4 WW StudlStd
SPACING 2-0-0
Plates Increase 1.15
Lumber Increase 1.15
Rep Stress Incr NO
Code IRC2003fTPI2002
REACTIONS (lbJslze) 18=1697lMechanlcal,10=1697lMechanlcal
Max Horz 18=19(LC 5)
Max Uplift18=-632(LC 5), 10=-636(LC 5)
Max Grav 1B=2152(LC 2), 10=1951(LC 3)
C5I
TC 1.00
BC 0.63
W8 0.96
(Matrix)
DEFL
Vert(LL)
Vert(TL)
Horz(TL)
In (Ioc)
-0.1514-16
-0.3114-16
0.10 10
Ud
240
180
nJ.
Ildefl
>999
>999
nJ.
Weight: 2111b
BRACING
TOP CHORD
Structural wood sheathing directly applied or 5-6-0 oc puriins, except end
verticals, and 2-()"0 oc pUl1ins (3-1(1..0 max.): 2-3,4-7.
Rigid ceiling directly applied or 10-(1..0 oc bracing, Except:
8-3-2 oc bracing: 14-16.
1 Row at midpt 3-14,5-14,5-13, &-11, 1-18, 8-10
BOT CHORD
WEBS
BOT CHORD
WEBS
FORCES (Ib). Maximum CompressionfMaximum Tension
TOP CHORD 1.2=-1231/459,2.3=-25611895,3-4=-24741863,4-5=-18731838,5-6=-17601808, 6-7=-1047/616, 7-8==-13191670, 8-9=-124/267, 1.18=-21181652,
9-10=-1891235
17_18=0151,16-17=-20411030,15-16=-64912510,14-15=-649/2510, 13-14=-34411870, 12-13=-27911616, 11-12=-27911616, 1D-11=-641750
2_17=-13301374,2_16=-677/2235,3-16=-1519/573,3-14=-7541379, 4-14=-153/585,5-14=-381/30,5-13=-470/184.6-13=-931612,6-11=-1282/386,
7-11=-167f381. 8-11=-119/975, 1-17=-425/1683, 8-10=-1852/486
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.0psf; BCOL=6.0psf; Category II; Exp C; enclosed; C-C Exlerior(2); cantilever left and right exposed;
end vertical left and right exposed; Lumber 001..=1.00 plate grip DOL=1.oo.
2) TCLL: ASCE 7-02; Pf--30.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) Provide adequate drainage to prevent water pondlng.
5) This truss has been designed for a 10.0 pst bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 632 Ib uplift at joint 18 and 636lb uplift at joint 10.
8) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlfTPI1.
9) Design assumes4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/2.1Od nails.
LOAD CASE(S) Standard
~.
Components
.-...n_
& WARM~G READ ALL NOTES O;\l THIS PAGE A:\D THE ATTACHED GE'\"ERU TRl:SS NOTES PAGE BEFORE HA'\"DLI:\G TRl!SSES
This design is based solely on parameters sho"Wtl, and is for an individual building component not a truss system. Applicability of design parameters and suitabiliT)
for this individual component and its loads are the responsibility of the building designer. This truss must be installed and loaded vertically. Bracing shov.-rl is for
the lateral support of individual web members only. The top and bottom chords are laterally braced by rigid sheathing unless noted otherv,ise. Additional permanent
bracing of the overall structure is the responsibiliT)' of the building designer, The ereClor is responsible for temporary bracing to insure stability during construction
For general guidance regarding storage, handling, erection and bracing consult the following documents ANSlffPI 1-2002 and DSB-89 available ITom
Truss Plate Institute. 218 '1, Lee Street. Suite 312. Alexandria, VA 223]4 ..'wv.w.tpinst,org..' PH 703-683-1010 also consult the BCSI 1-03 available from
Wood Truss Council of America, 6300 Enterprise Lane, ~adison. WI 53719 i www.woodtruss.com...PH 608-274-4849
Page 61 of 81
D-APPLWD-2007 -(S)-(CO)
APPLEWOOO
T17
SPECIAL
Lou-Mar Construction..Applewood Lot 2
Job
Truss
Truss Type
Stock Building Supply, o.nvlr, CO. 80229, Seott Th~on
Job Refetence 0 'onal
6.500 5 FItb 52007 MIT,k ~du$trl'$, Inc. Men Oct 1512:02:312007 Page 1
ow
.....
....
..,..
10-4-12
~7~
,&<>0
~7~
I
BxB~10.6
...,..
2~12 29--1(Kl
4-10.6 4-1-4
34-2-12
....12
3x4 = 4xB =
Scale = 1:92.5
~
8.00 [12
II
~
~
~
;!
.b
"'
OJ>
'1
o
1.
3x4 II
15
6xB =
14 13
3x6 =
12
3xB =
11
3xti =
10
4xB =
9
4x8 =
4-9-Il 1(1..4.12
4-s.8 5-7-4
Plate Offsets IX Yl' r2'1)..2 12 D-4-01 r4-0-5-5 Edael r6'Q..4..0 0-1 91 f15'0-3-80-3-01
4x4=
1&<>0
~7~
25-M2
....12
34-2-12
....
. . . .
LOADING (pst) I SPACING 2-0-0 eSI DEFL in (lac) I/defl Ud I PLATES GRIP
TeLL 30.0
(Roof Sn0w=30.0) Plates Increase 1.15 Te 0.80 Vert(LL) -0.22 10-12 >999 24D MT20 169/123
TCDL 10.0 Lumber Increase 1.15 Be 0.69 Vort(TL) -0.59 10-12 - 180
BClL 0.0 I RepStress Incr NO WB D.n Horz(TL) 0.10 9 nI. nI.
BCDL 10.0 Code IRC2003ITPI2002 (Matrix) I Weight: 2071b
LUMBER
TOP CHORD 2X6SPF2100f1.8E*Except*
T3 2X4 SPF 1450F 1.3E, T4 2 X 4 SPF 1450F 1.3E
BOT CHORD 2X4SPF145OF1.3E
WEBS 2 X 4 HF StudlStd *Except*
W11 2 X 4 SPF 1450F 1.3E, W10 2 X4 WN Stud/Std, W8 2X4 WW Stud/Std
W7 2 X 4 WW Stud/Std, W12 2 X 4 WW StudJStd
REACTIONS (Ib/slze) 16=1697IMechanical,9=1697/Mechanical
Max Horz 16=-142(LC 5)
Max Upllft16=-635(LC 5), 9=-615(LC 5)
Max Grav 16=2113(LC 2), 9=1697(LC 1)
BRACING
TOP CHORD
BOT CHORD
WEBS
JOINTS
Structural wood sheathing directly applied or 5-6-0 DC purtins, except end
verticals, and 2.0-0 DC purllns(4-11-2 mal: 1-2,4-6.
Rigid ceiling directly applied or 8-3-10oc bracing.
1 Row at midpt 3-12,5-10,7-9
1 Brace at Jt(s): 1
FORCES (Ib) - Maximum CompressionIMaximum Tension
TOP CHORD 1-2=-2675/813,2-3=-2737/873,3-4=-21381851, 4-5=-162!i{792, 5-6=-10791667, 6-7=-1290/716, 7-8=-159/288, 8-9=-2361255
BOT CHORD 15-16=-01142, 14-15=-64212598, 13-1~141, 12_13=-46012141,11_12=-20011482, 10-11=-20011482, 9-1()=..86/772
WEBS 1-15=-98013227,2-15=-17011626,2-14=-5301211,3-14=-581357,3-12=-8341411, 4-12=-2091524, 5-12=-14/340, 5-10=-9651289, 6-10=-1621390,
7-10=0n"60, 7-9=-1618/459, 1-16=-20711654
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDL=6.Opsf; BCDLoo6.Opsf; Category 11; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed:
eMJ vertical left and right exposed; Lumber DOL=1.00 plate grip DOl"'1.00.
2) TCLL: ASCE 7-02; Pf=30.0 psf (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalarteed snow loads have been considered for this design.
4) Provide adequate drainage to prevent water pending.
5) This truss has been designed fora 10.0 pst bottom chord live load nonconcUlTent with any other live loads.
6) Refer to glrder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 6351b uplift at joint 16 and 6151b uplift at joint 9.
8) this truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlfTPl1.
9) Design assumes 4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/2-1Od nails.
LOAD CASE(S) Startdard
"'WAR)~]NG READ ALL ~OTE:S 0:\ THIS PAGE A:'OD THE ATTACHEDGE:NERAL TRl:SS l\OTES PAGE: BEFORE: HAl\DLI~G TRl:SSE:S
lbis design is based solely on parameters shown, and is for an individual building component not a truss system. Applicability of design parameters and suitability
for this indi,'iduaJ component and its loads are the responsibility of the building designer, This truss must be installed and loaded vertically_ Bracing shown is fOT
the lateral support of individual web members only. The top and bottom chords are laterally braced by rigid sheathing unless noted otherwise, Additional pennanent
bracing ofthe overall structure is the responsibility of the building designer. The em:tor is responsible for temporary bracing to insw-e stability during construction.
For general guidance regarding storage, handling, erection and bracing consult the following documents A~SurPll-2002 and DSB-89 available from
Truss Plate Institute, 2]8 ~_ Lee Street, Suite 312. Alexandria, VA 22314 /WW\.\',tpinstorg/ PH 703-683-1010 also consult the BCSII-0311vailable from
Wood Truss Council of America, 6300 Enterprise Lane, Madison. WI 53719/ www.woodtruss.com/PH 608-274-4849
~lCIIK1'
CO_pDne..b.
.--
D-APPLWD-2QQ7 -(S)-(CO)
Page 62 of 81
APPLEWOOO
T18
HIP
Lou-Mar Construction...Applewood Lot 2
Job
TroM
TN$$Type
Stock Building Supply, Denver, CO. B0229, $4;:otl Tholqlson
JobRefe~ee llanal
6.500 5 Fsb 52001 MlTek ndustrislio, ne:. Man Oct 1512:02:32 2007 Page 1
...."
...."
12-0-7 ,..... 2><-" 2&-,,, 34-2.12
5-11-9 5--11-9 6x8 = 5-8-12 'H ...."
..00 If2 .d~ Scale = 1:101.3
5 6
3x4 ~
+
N
;
Of
~
hS== 15 ,. 13 12 11 10 9
10x10 ::::; 3x4 = 4x4 = 4x4 :::: 3x8 = 4x6 = 3x4 =
..." ,..... 2><-rl'<'~ 28-10-0 34-2-12
I
..." 8-11-6 ...." .,~ ...."
Plate Offsets ex.n [1-0-4-12 Edael rS'()..4..0o-1-81 r6'Q-3-5 Edael r8'O-3-8 Edael rg-EdQe 0-1 81
. , . ,
LOADING (pst) SPACING 2-0-0 C5I OEFL '" (Ioc) IIdefl Ud PLATES GRIP
TelL 30.0
(Roof Soow--30.0) Plates Increase 1.15 TC 0.73 Vert(LL) -0.19 '-15 >999 240 MT20 169/123
reDL 10.0 Lumber Increase 1.15 BC 0.83 Vert(TL) -0.50 '-15 >814 180
BelL 0.0 Rep Stress Iocr NO we 0.91 Hon(TL) 0.10 9 oJ. oJ.
BCDL 10.0 Code IRC2003ITPI2002 (Matrix) Weight: 1941b
LUMBER
TOP CHORD 2X4SPF145OF1.3E
BOT CHORD 2X4SPF145QF1.3E
WEBS 2 X 4 HF Stud/Std *Except*
W82X4WWStudIStd, W12X4SPF 1450F1.3E, W92X4$PF 1450F 1.3E
BRACING
TOP CHORD
BOT CHORD
StnJctural wood sheatning directly applied or 2-~14 oc purlins, except end
verticals, and 2-0-0 oc pur1ins (5-9-2 max.): 5-6.
Rigid ceiling directJy applied or 10-G-O oc bracing. Except:
7-6-12 oc bracing; 1-15.
1 Row at midpt 3-13,5-11,7-10,8-9
WEDGE
Left 2 X 10 OF 1950F 1.7E
WEBS
REACTIONS (Ib/size) 1=1701/MecI1anicaJ,9=1701/Mechanical
Max Horz 1=48(LC 5)
Mill( Uplift1"'-598(LC 5), 9"'-612(LC 5)
Max Grav 1=2070(LC 2), 9=1786(LC 3)
FORCES (Ib). Maxlmum Compression/Maximum Tension
TOP CHORD 1-2=-31371935,2-3=-27471968, J..4=..1822/BOO, 4-5=-1496/834, 5-6"'-10401723, 6-7=-1333/768, 7-8=-12191579, &.9=-1725/652
BOT CHORD 1-15=-67412420,14-15=-40011901,13-14=-400/1901,12-13=-12211364,11-12=-122/1364, 10-11=-99/889, 9-10=01115
WEBS 2-15=-5021353,3-15=-198/662,3-13=-9161478,5-13=-295/892,5-11=-745/154, 6-11=-1551316, 7-11=0/527, 7-10=-769/270, &.10=-30511206
NOTES
1) Wind: ASCE 7-02; 11Omph; h"'25ft; TCDL=6.0psf; BCDL=6.0psf; Category II; Exp C; enclosed; C-C Exterior(2); cantilever left and right exposed ;
end vertical left and right exposed; Lumber DOL=1.00 plate grip DOL=1.00.
2) TCLL: ASCE 7-02; Pf--30.0 pst (flat roof snow); Category II; Exp C: Partially Exp.; Ct= 1
3) Unbalanced snow loads have been considered for this design.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 pst bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for tnJss to tnJSS connections.
7) Provide mechanical connection (by others) of tnJSS to bearing plate capable of withstanding 598lb uplift at joint 1 and 6121b uplift at joint 9.
B) This truss is designed in accordance with the 2003lntematlonal Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSIITP11.
9) Design assumes 4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/ 2-1Od nails.
LOAD CASE(S) Standard
... WARJ'i'JNG READ ALL 'OTES O!'ri THIS PAGE A~D THE ATTACHED GE'ER~L TRrSS J\OTES PAGE BEFORE HA'DLI~G TRl~SSES
This design is based solely on parameters shown, and is for an individual building component not a truss system, Applicability of design parameters and suitability
for this individual component and its loads are the responsibility of me building designer. This truss must be installed and loaded vertically. Bracing shown is for
the lateral support ofindividuaJ web members only, The top and bottom chords are laterally braced by rigid sheathing unless noted other....ise. Additional pennanenl
bracing of the overall structure is the responsibility of the building designer. The ere>:tor is responsible for temporllI) bracing to insure stabilil)' during construction
For general guidance regarding storage. handling, erection and bracing consult the following documents ANSlfTPJ 1-2002 and DSB-89 available from
Truss Plate Institute, 2]8;-..J, Lee Street, Suite 312, A]exandria, VA 223]4 /",,",wtpinSlorg,/ PH 703-683-1010 also consult the BCSI 1-03 available frOln
Wood Truss Council of America. 6300 Enterprise Lane, Madison, WI 53719 'WWv.',woodtruss,com'/ PH 608-274-4849
~~K1
COIIIpOnedt6
. WDl.SB.Rcornpanv
D-APPLWD-2007.(S)-(CQ)
Page 63 of 81
APPlEWOOD
n9
HIP
Lou.Mar Construction...Applewood Lot 2
Job
Truss
Truss Type
Stock Building Supply, Denver, CO. 80229, SCott Tho~son
Job Reference onal
6.500 s Feb 52007 MlTek .,dustr1es. "c. Man oct 1512:02:342007 Page 1
....
....
1.5x4 \\
,~.. 15-7-11 I ,..,.. 26-1-1 '""" 34-2-12
~~2 ~2~ 6x8'l5-2-11 5-2-11 3-11-1 ~2~
8.00 R2 3x4 = 4x8 .::::- Scale = 1 :89.1
5 7
3x6 'l
3x4 'l
II
'1
1 :1
I ~
I~
I
,
,. " ,. 13 12 11 10
3x4 = 3x6 = 3x4 = 3x4 = 4x8 = SxS =
15-7-11 ,..,.. 3x4~_1 34-2-12
7-9-4 5-2-11 5-2-11 8-1-11
..
;H
do
5x5=
8x8 =
7-10-7
7-10-7
Plate Offsets (XY\' '1'0-3-120-2..(11 [5'0-4-80-1121 17'0-4-00-191
, . , ,
LOADING (psf) I SPACING 2-0-0 C5I DEFL In (loe) IIdefl Ud PLATES GRIP
TCll 30.0
(Roof Snow=30.0) Plates Increase 1.15 TC D." Vert(Ll) -0.15 1-16 >999 '4Il MT20 1691123
TCDl 10.0 lumber Increase 1.15 BC 0.75 Vert(Tl) -0.35 1.16 >999 1SO
BCll 0_0 I RepStresslncr ND WB D.SO Horz(TL) 0.12 10 nI. nI.
BCDl 10.0 Code IRC2003!TPI2002 (Matrix) Weight: 200 Ib
LUMBER
TOP CHORD 2X4$PF 1450F 1.3E
BOT CHORD 2X4SPF 1450F 1.3E
WEBS 2 X 4 HF Stud/Std *Except*
W72X4WWStudlStd
BRACING
TOP CHORD
BOT CHORD
WEBS
Structural wood sheathing directly applied or 3-0-2 oe purlins, except end
verticals, and 2-0-0 oe purlins (5-0-4 max.): 5-7.
Rigid ceiling directly applied or 7-M5 oc bracing.
1 Row at midpt 3-14, S-13, 6-13, 6-11, 8-10
WEDGE
Left: 2X 10 DF 1950F 1.7E
REACTIONS (Ib/size) 1=1701/Mechanical,10=1701/Mechanical
Max Horz 1=48(LC 5)
Max Uplift1=-607(lC 5), 10=--626(LC 5)
Max Grav 1=2127(LC 2), 10=189O(lC 3)
FORCE$ (lb). Maximum Compression/Maximum Tension
TOP CHORD 1-2=-32S61955, 2-3=-29291985, 3-4=-2134/836, 4-5=-21181871, S-6=-15321794, 6-7=-1097/671, 7-8=-13851725, 8-9=-167/279, 9-10=-242/248
BOT CHORD 1-16=-70412532, 15-16=-476'2117, 14-15=-47612117, 13-14=-23311654, 12-13=-21411532, 11-12=-21411532, 10-11=-891821
WEBS 2-16=-3971296,3-16=-162/543,3-14=-798/416, S-14=-250177S, 5-13=-2781197, 6-13=-1021326, 6-11=-1017/275, 7-11....1591377, 8-11....11m6,
3-10=--17501484
NOTES
1) Wind: ASCE 7-02; 11Omph; h=25ft; TCDl=6.0pst; BCDl=6.Opst; Category II; Exp C; endosed; C-C Exterior(2); cantilever left and right exposed;
end vert,calleft al'Kl right exposed; Lumber DOL=1.00 plate grip DOL=1.00.
2) TCll: ASCE 7-02; Pf=30.0 pst (flat roof snow); Category II; Exp C; Partially Exp.; Ct= 1
3) Unbalanced snow toads nave been considered for tnis design.
4) Provide adequate drainage to prevent water pending.
5) This truss has been designed for a 10.0 pst bottom chord live load nonconcurrent witn any other Bve loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by otners) of truss to bearing plate capable ofwithstanding 6071b uplift at joint 1 and 626lb uplift at joint 10.
8) This truss is designed in accordance with tne 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard
ANSlfTPI1.
9) Design assumes 4x2 (flat orientation) purlins at oc spacing indicated, fastened to truss TC w/2-1Od nails.
lOAD CASE(S) Standard
""'ARNI~G READ ALL !"OTES 01\ THIS PAGE AND THE .4.TTACHEOGE"'ERAL TRl:SS !"OTES P.4.GE BEFORE HA!"DLING TRl'SSES
This design is based solely on parameters shown, and is for an individual building component not a truss system. Applicability of design parameters and suitability
for this individual component and its loads are the responsibility of the building designer This truss must be installed and loaded vertically, Bracing shown is for
the lateral support of individual web members only, The top and bottom chords are laterally braced by rigid sheathing unless noted otherwise Additional pennanent
bracing of the overall structure is the responsibility of the building designer, The erector is responsible for temporary bracing to insure stability during construction
For general guidance regarding storage, handling, erection and bracing consult the following documents ANSlrrPI 1-2002 and DSB-89 available from
Truss PlaTe Institute, 218 N, Lee Street, SuiTe 312, Alexandria VA 22314;' ""'W\\'.tpinsLorg;, PH 703-683-1010 also consult the BCSI 1-03 available from
Wood Truss Council of America 6300 Enterprise Lane. Madison. \Vl 53719! www,woodtrusscom " PH 608-274-4849
~[j;]~
Componenta
.--.
D-APPLWD-2007 -(S)-(CO)
Page 64 of 81
HEAVENER ENGINEERING, INC.
1963 S. PEARL ST.
DENVER, CO 80210
phone: 303-733-1962
fax: 800-783-7438
e-mail: heistructures@msn.com
February 5, 2008
LouMar Entities
3650 Vance St., #1
Wheat Ridge, CO 80033
Re: Lot 2, Filing 1, Applewood Preserve Subdivision, Wheat Ridge, CO
Tiedowns for the girder truss at the front of the building are in place and are adequate to resist
the uplift forces shown on the truss shop and erection drawings.
Heavener Engineeri
~~ener, PE
\\~;\\ \',',', \ ~.i:: i , ~.~ .~. . ,', .
;' ...~5~., .cl.""
,:,\.~~'t.'"""fl'1JC"'~""/'2r^ .
~,'. ~'v~~.,,,> i(. 1:1 EA l<,;".; .(' "
;,,"~ ."0<;;: , ~1;',,:',;~~.
.:: ',..,J.B ""') '1J ~~ \:;:::.
- .. .
.::: . ..
J ';i,~ 19267 :I:"::c
:t ~e..i\~':.~-
-:::;.~",Cl. ...~,.<,--
,,"?-("{l .... .~..!""~ ,::--
'l,.(".V, ....... {:~:\'\.).'~'
";.' IO!.,.. c,...,"
Iii/ ~ h I.- \,'
1,1 i ! if /I II I : ' ~ \I \ \ \ '
In TEe I Integrated Testing and Engineering Company of Denver Metro, LLC
Geotechnical, Environmental & Geological Engineering . Construction Services . CIVil Site Development
October 18, 2007
Lou-Mar Construction
3650 Vance Street, Suite 100
Wheat Ridge, CO 80033
Attention: Mr. Lou Ficco
Re: Foundation Drain Observation
Proposed Residence
3215 Iris Court
Wheat Ridge, CO 80205
InTEC Project No. C071048
Mr. Ficco,
As requested, InTEC of Denver Metro, LLC traveled to the above-referenced site on
September 9' 2007 for the purpose of observing the foundation drain and damp
proofing. Appropriate damp proofing had been applied to all living areas subject to
backfill operations. The drain consisted of a 4 inch PVC pipe, covered with rock, and
protected with geofabric. Elevation checks appeared to show appropriate flow in all
areas of the drain.
We at InTEC appreciate the opportunity to be of service to you on this project, and we
wish to thank you for your business. If we can be of further assistance on this or other
projects, please call us at 303-463-9317.
Respectfully submitted:
InTEC of Denver Metro
David Beasley, P.E.
Branch Manager
Copies: Addressee (3)
15403 E. 17th Avenue, Ste. E . Aurora, CO 80011 . (303) 463-9317 . fax (303) 463-9321 . www.intec-geotech.com
Austin
(512) 252-1218
fax (512) 252-1219
DFW Metro
(817) 858-0870
fax (817) 858-0036
Houston
(281) 371-3330
fax (28]) 371-3334
San Antonio
(210) 525-9033
fax (210) 525-9032
In TEe I Integrated Testing and Engineering Company of Denver.Metro, LLC
Geotechnical, Environmental & Geological Englneenng . Construction Services . CIvil Sile Development
September 17, 2007
Lou-Mar Construction
3650 Vance Street, Suite 100
Wheat Ridge, CO 80033
Attention: Mr. Lou Ficco
Re: Foundation Drain Observation
Proposed Residence
3215 Iris Court
Wheat Ridge, CO 80205
InTEC Project No. C071048
Mr. Ficco,
As requested, InTEC of Denver Metro, LLC traveled to the above-referenced site on
September 9' 2007 for the purpose of observing the foundation drain. The drain
consisted of a 4 inch PVC pipe, covered with rock, and protected with geofabric.
Elevation checks appeared to show appropriate flow in all areas of the drain.
We at InTEC appreciate the opportunity to be of service to you on this project, and we
wish to thank you for your business. If we can be of further assistance on this or other
projects, please call us at 303-463-9317.
Respectfully submitted:
InTEC of Denver Metro ~~.~~~oS'~
t r J,..~~. e~~,.~\
'\, ~~(iJ)25552~' 'c /
""....... )
~o", _ i
U .' '\..... _,,~
Copies: Addressee (3)"'''.:~_:>~~
David Beasley, P.E.
Branch Manager
15403 E. 17th Avenue, Ste. E . Aurora, CO 80011 . (303) 463-9317 . fax (303) 463-9321 . www.intec-geotech.com
Austin
(512) 252-1218
fax (512) 252-1219
DFW Metro
(817) 858-0870
fax (817) 858-0036
Houston
(281) 371-3330
fax (281\ 371-3334
San Antonio
(210) 525-9033
fax (210) 525-9032
HEAVENER ENGINEERING. INC.
1963 S. PEARL ST.
DENVER, CO 80210
phone: 303-733-1962
fax: 800-783-7438
e-mail: heistructures@msn.com
November 27, 2007
LouMar Entities
3650 Vance 51, #1
Wheat Ridge, CO 80033
Re: Lot 2, Filing 1, Applewood Preserve Subdivision, Wheat Ridge, CO
The loose lintels over window and door openings that have been installed with bolts on each end
into the king studs is an acceptable installation. A minimum of 4" of bearing each end onto the
adjacent masonry veneer is still a necessary part of the installation.
The sloping angle lintels over the one story hipped roof in the southeast corner of the garage will
need 1/2" diam. x 31/2" lag bolts installed into the vertical leg of the angle at every stud (16"
spacing).
>'_i-"\.,,i:t1ii,'ji_
>",''''~:'(~,a Ii EGJ.;~/.'//
",'Q_~"('L~""'''<l'.",!:> t) .,.. '~?
, ~~;~...~ \-\EAv/'<~ ~.~,
~(~~,~tif tV~6~~Ji
"'", '''\ '.1"'", '::'
. =
~\O~ 19267 io:~
~e.~.. .. ~'4J ~
._.~ "It 0,"4",-,_
,.f'.y,," ....."f/;;...::-
{~-o... "oil ("."- ,~:::
"" v,{'~~h""..!.~<>:\,~
";:'f,c.;,!'(.'i~j A\. \.-','"","
"'i:'iJili;r:'Ij\\I.i\\\"
HEAVENER ENGINEERING, INC.
1963 S. PEARL ST.
DENVER, CO 80210
phone: 303-733-1962
fax 800-783-7438
e-mail: heistructures@msn.com
September 5, 2007
LouMar Entities
3650 Vance St., #1
Wheat Ridge, CO 80033
Re Lot 2, Filing 1, Applewood Preserve Subdivision, Wheat Ridge, CO
FIELD REPORT NO.1
Date of inspection: September 4, 2007
Present at site: Jere Heavener
Work observed: Grounding rod in the foundation walls.
Comments: A #4 grounding rod was tied to the bottom reinforcing and extended above the
intended foundation pour in the southwest comer of the main house.
Heavener Engineering, Inc.
~P-4~~-
JL_~eavener, P.E.
i";~""".,,;,,.!
,",\t,\'~ tC/'''' "',
,>,\:,,~ ":"~ _" '1L'~,<>'::,- ,,,:...~:.
" {, 'r\E.Av,::'" ,),,"'-"')~::.
";;...."" -'v...'.oi'~:':
,,' (<':"t.:"",,;
" .,::>~.~-;;
~ ~
19267 ; ,~: ~.
;'::,\ ...~:;;:J'
:',,;''''_ ... r;'::"$
''-' .....o..c,\"J-'~
\ ION A \. ~,>"'"
"-""1'1"."\'.'
In TEe I Integrated Testing and Engineering Company of Denver Metro, LLC
Geotechnical, Environmental & Geological Engineering . Construction Services . CIvil Site Development
August 31, 2007
,
Lou-Mar Construction
3650 Vance Street
Wheat Ridge, CO 80033
Attn: Mr. Lou Ficco
RE: Drilled Pier Installation Observation
Proposed Residence
3215 Iris Court
Wheat Ridge, CO 80033
InTEC Job No. C071048
Mr. Ficco,
As requested, InTEC of Metro Denver, LLC observed the installation of drilled piers for the
proposed residence at the subject site on August 23, 2007.
The installation of the drilled piers for the proposed residence was observed. The observed
piers obtained the minimum specified length and penetration as specified by plans onsite.
Steel met with plan specifications. Groundwater was not encountered in holes observed.
Casing was not required during drilling operations. Concrete was observed at the time of
our site visits. Piers 10-16 & 27-31 were unobserved.
If you have questions concerning this project, or if we can be of further service, please
call.
Respectfully submitted,
~C?.!!~~8~
. 9"" ~. 8q,.~
o/p ~\(\\
.'J/<C. iJ5554 rn.....,
Ie -' ...1
-;1' ,
.:,\
, '~""\" ./
" ",' '.
,"'''' . .J
'\,:, , v / .. ',' ,,',
.... :~~'" .1,., ,_ .'
David Beasley, P.E.
Branch Manager
InTEC of Denver Metro, LLC
Matthew Behrens, E.I.
Staff Engineer
Copies: Addressee (3)
Attachment: Pier Observation Log
15403 E. 17tb Avenue, Ste. E . Aurora, CO 800n . (303) 463-9317 . fax (303) 463-9321 . www.intec-geotecb.com
Austin
(512) 252-1218
fax (512) 252-1219
DFW Metro
(817) 858-0870
fax (817) 858-0036
Houston
(281) 371-3330
fax (281) 371-3334
San Antonio
(210) 525-9033
fax (210) 525-9032
o
UI
'1:
UJ ,., III
~ ~ N
::J ~ l')
en c? iD
~:::. E
c(o_cu
.c 0 C'J Z
~co~n
~ - CD
()~",U'['
UJS!5Wa.
~LAI...'"
..5....<(.5
Q
DC:
o
U
W
DC:
o
z
:J
....
ii2
Q
DC:
W
it
;.;
11
E
'"
Z
1::
8.
Gl
IX:
1ii
.;;:
.Sl
'"
:::!:
C>
C
'C
,., m
e ~ ~ ~ ~ ~ ~ '0 ~
l') al ~ CI.I CI.I CI.I CI.I 2! CI.I CI.I CI.I ~ CI.I CI.I CI.I CI.I 2! CI.I CI.I CI.I CI.I CI.I
~ I: c: c: c: c: c: c: c: c: c: c: c: c: c: c: c:
6l B 6l 6l 6l 6l B 0 6l B 6l 6l 0 B B 6l B 6l 6l
<Xl Vl ~ ~ ~ 3: ~ 3: 3: Vl CI.I
VI VI VI VI VI VI '"
~ ~ ~ ~ ~ ~ ~ ~ ~ I~ .Q .Q .Q ~ ~ ~ ~ ~ I~ I~ I~ !~ ~ .Q
0 0 0 0 0 0 0 0
c: c: c: c: c: c: c: c:
0 0 0 0 U 0 0 0 0 U ::l ::l ::l ::l ::l ::l ::l 0 0 U 0 0 U 0 U 0 0 ::l
<Xl ,.... .,. \0 ..... <Xl .,. \0 .,. \0 .,. \0 ,.... .,. ,.... \0 .,. <Xl Ltl
-,sa: ~ -i Lri Lri ..... Lri ~ Lri Lri -i Lri Lri ~ ~ -i Lri Lri ~ N
~ 0.- N N N ~ N N N N N N N N N
Q)1:
1-00
,s-~ <Xl ,.... .,. \0 ..... <Xl .,. \0 .,. \0 .,. \0 ,.... .,. ,.... \0 .,. <Xl 10
oi a) ~ c:i ..... c:i c:i ~ c:i oi c:i c:i oi oi oi c:i c:i oi N
Q.IIl~ ..... ..... N oi N N N ..... N N ..... ..... ..... N N .....
Q)"'''' .....
OD..Q)
al
3~
,s ~
~a:
Oal Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln
.... -
o .-
E~
to=E . b . . . . . . . . . . . . . . . b . . . . b . . . .
CO 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... .....
.Q
E ~ ~ ~ 1Il ~ ~ 1Il ~ ~ ~ ~ ~ ~ ~ 1Il ~ ~ ~ '" ~ ~ '" ~ '" ~ '" '"
::J
a: >- >- >- ~ ~ ~ ~ ~
.....
""
...
CI.I
a::
<Xl c '5
~ 0
"" l!! ~
... g
,., ~ m
0 ...J
(.) N Ltl en ..... M ~ ...;
;.; Vl M N \0 <Xl r-. ..... ..... N Ltl ..... <Xl ..... N N N N
M N
11 N N "" "" "" "" ,.... "" "" 10 ..... "" ..... .,. ..... "" ..... <Xl "" 10 "" "" "" ~ "" ""
"" '5 ..... "" "" "" "" N
"" ... ... ... "" ... ... ... ..... ... ..... ... "" ... ... ... ...
E ... CI.I CI.I CI.I CI.I CI.I "" CI.I "" CI.I "" CI.I CI.I ... CI.I "" CI.I CI.I
... CI.I ... ... ... ... CI.I
::J CI.I ... ... a:: a:: a:: ... a:: a:: CI.I a:: CI.I CI.I a:: CI.I a:: ... a:: a:: a:: a::
CI.I CI.I a:: CI.I ... ... ... CI.I a:: ...
Z a:: E a:: '5 ..... '5 a:: ..... '5 CI.I a:: '5 a:: CI.I a:: ..... a:: CI.I ..... a:: '5 '5 CI.I ..... '5
..... 0 0 a:: a:: 0 a:: 0 '5 a:: 0
tl ..... 0 ..... '5 '5 '5
0 8 '5 '5 0 .....
l!1 II € € € € .c '5 € '5 fj '5 ~ 0 I~ ~ .c ..... ~ .c
~ ~ ~ ~ ~ ~ ..... 0 .....
2 ~ == == ::l ~ CI.I '" '"
Itl == 0 0 0 0 0 w m 0 w Itl tJl m w tJl == tJl w tJl tJl
a. w z z z z z z z z z w VI w VI Z VI
"" ..... N M .,. Ltl \0 r-. <Xl en 10 ..... N M .,. Ltl \0 r-. <Xl 0\ 10 ..... N M ~ Ltl \0 r-.
..... ..... ..... ..... ..... ..... ..... ..... ..... ..... N N N N N N N
~~~~~~
~~~6l6l6l
OOO~~~
c:c:c:_,..,._
:::l:::l:::lU,-,U
VIO
0000
NN
VIO
rr)rr)
NN
LnLnLnLnLnLn
= c = = = =
000000
~ ~ 'I""""l 'I""""l 'I""""l.....
ui
(,)(')
UJO
f-;jI;
E....
i1i
:c
B
~
Q.
11l
!to
11l
.J::. i 00
c, 'S Z ell
c: i ",0
Gl.iia:: '-z
~~'" ~i
lil"O~ 'c;,.!!l
.~~ii: c:~
(,) .... W a::
UJ Ull1l "0_
El1lGl;.:.c:c
~,...~ g ::Ia.ffi.cl1ll1l
C/J N,,*,0\,,*,ct)S.5~l5"2 ~~
Q)~::tt:-I-Nr-:t:t:::t:t::C:Q) ~"'OUJ
3~""'!!!,,*, Q).... ....:io al[ Gl 0
.... .!!!a. ....a::.!!!.!!! .5 Gl c: ell
~gCOe:'O~'Oe:e:i"O~ 5id: ~O
.... o-6.....~oo. !!ii-s,,,, ",Z
ts:;Ot::1iSts ~::IC:C:C:
OlItlOUJOItlItl Q.0.!'!!.!'!!11l
aUJVlZZUJUJcncna::a. a. a.
5coO\o........NM
<(NNMMMM
~~~~~~
I I TEe I Integrated Testing and Engineering Company of Denver Metro, LLC
n Geotechnical, Environmental & Geological Engineering . Construction Services . Civil Site Development
September 6, 2007
Lou-Mar Construction
3650 Vance Street, Suite 1
Wheat Ridge, CO 80033
Attn: Mr. Lou Ficco
RE: Drilled Pier Installation ObseNation
Proposed Residence
3215 Iris Court
Wheat Ridge, CO 80205
InTEC Job No. C071048
Mr. Ficco,
As requested, InTEC of Metro Denver, LLC observed the installation of drilled piers for the
proposed residence at the subject site on August 23,2007.
The installation of the drilled piers for the proposed residence was observed. The observed
piers obtained the minimum specified length and penetration as specified by plans onsite.
Steel met with plan specifications. Groundwater was encountered in holes observed.
Casing was not required during drilling operations. Concrete was observed at the time of
our site visits. Piers 10-16 & 27-31 were unobserved.
If you have questions concerning this project, or if we can be of further service, please
call.
Respectfully submitted,
InTEC of Denver Metro, LLC
Matthew Behrens, E.!.
Staff Engineer
David Beasley, P.E.
Branch Manager
Copies: Addressee (3)
Attachment: Pier Observation Log
15403 E. 17tb Avenue, Ste. E . Aurora, CO 80011 . (303) 463-9317 . fax (303) 463-9321 . www.intec-geotecb.com
Austin
(512) 252-1218
fax (512) 252-1219
DFW Metro
(817) 858-0870
fax (817) 858-0036
Houston
(281) 371-3330
fax (2K\) 371-3334
San Antonio
(210) 525-9033
fax (210) 525-9032
Q
II::
o
U
w
II::
C)
z
:J
..I
ii2
Q
II::
w
ii:
L.:
B
E
:J
Z
t
8.
Q)
c::
'"
.<::
.Sl
01
~
'"
l:
.<::
I"- 01
0 Q) ~ ~ ~ al ~ "'C ~ ~
M lD 2! QJ QJ 2! QJ QJ QJ QJ QJ ~ QJ QJ QJ QJ QJ QJ QJ QJ QJ QJ
!:::! <:: <:: <:: <:: <:: <:: <:: ~ <:: <:: <:: <:: <:: <:: <:: <:: <:: <::
&l .8 &l &l 0 0 &l 0 0 .8 &l &l &l &l &l 0 &l &l &l
ClO i7S i7S i7S i7S ~ 5l ~ ~ ~ ~ ~ i7S ~
Ul Ul
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ .c ~ ~ ~ ~ ~ ~ ~ I~ I~ ~
0 0 0 0 0 0 0 0
<:: <:: <:: <:: <:: <:: <:: <::
Cl U U U 0 U 0 0 0 0 :::> :::> :::> :::> :::> :::> :::> u 0 0 U U U U U 0 0 :::>
00 '" V \0 .... 00 V \0 V \0 V \0 l"- V '" \0 V 00 U"l
_.<::'0 ~ ~ Lri Lri .... Lri Lri Lri Lri ~ Lri Lri ~ ~ ~ Lri Lri ~ N
01- CD N N ~ N N N N N N N N
_ 0.-
o CD 0=
f-cCi
.<::_g 00 '" V \0 .... 00 V \0 V \0 V \0 '" V '" \0 V 00 ~
ai oci ci ci .... ci ci ci ci ai ci ci ai ai ai ci ci ai
aU)~ .... .... N N ai N N N N .... N N .... .... .... N N ....
CD 01'0 ....
CD-CD
lD
Bg
:; ~
0.'0
CD CD
CeD i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o i:o
o:!:
E~
01'-: . . . . . . . . . . . . . . . . .
.- ~ 0 0 0 0 0 0 0 0 0 0
cC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
.... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... ....
.c
E III III III III III III III III III III III III ~ ~ ~ llJ ~ llJ llJ III III llJ III III III III III
:J
ii: ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ >- >- >- ~ ~ >- ~ ~ ~ ~ ~
....
"*'
~
QJ
0:
ClO l: ....
~ ~ 0
..... \!! "jg
I"- ::l III
0 ...J "tj LU
2 N In 0> .... N C"'"l V ....;
L.: i7S C"'"l C"'"l N \0 00 '" .... .... N U"l .... 00 .... N N N N N
Q) N N "*' "*' "*' "*' '" "*' "*' 0 .... "*' .... V .... "*' .... 00 "*' 0 "*' "*' "*' ~ "*' "*'
"*' '0 .... "*' "*' "*' "*' N
E "*' ... ... ... ... "*' ... ... ... .... ... .... ... "*' ... ... ... ... ~
... .~ QJ QJ QJ QJ QJ "*' ... QJ ... "*' ~ QJ ... "*' QJ QJ QJ QJ "*' QJ QJ
:J QJ ... ... 0: 0: 0: ... 0: 0: QJ 0: QJ QJ 0: QJ 0: ... 0: 0: 0: 0:
QJ QJ Q. QJ ... ... ... QJ 0: ~
0: <:: 0: '0 '0 '0 0: '0 '0 QJ 0: '0 0: QJ 0: '0 0: QJ '0 0: .... ..... QJ .... ....
... '0 0: 0: 0: 0 .... 0 0: 0 0
ti '0 '0 '0 '0 .... 0
g 8 '0 II .r= -€ -€ '0 .r= .r= .... .r= '0 fi 0 '0 ~ '0 ~ II .r= '0 .r= .r=
~ ~ ~ ~ 0 "jg ~ ~ "jg "jg ~ ~ ~
e ~ 3= 3= ::l ~
0 0 0 0 0 LU III 0 LU III ~ III LU ~ ~ LU ~ ~
LU Z 3= z z z z z z Z LU Z LU Ul LU LU Ul z 3= Ul
=It .... N C"'"l V In \0 '" 00 0> 0 .... N C"'"l V U"l \0 '" 00 0> 0 .... N C"'"l V In \0 I"-
.... .... .... .... .... .... .... .... .... .... N N N N N N N N
-
(,)
1Il
"C::
LU .... II)
.! :;)C\iU
"S OJ ('I')
~ ;3 i1i.c
.3::.,. E
...... 0 _ cu
.<:: S! '" Z Z
--0
~o!:!.1l
u..i u 'e-"
08l!!wa.a.
wvel-
f-1O:JC
.5-r-<:(-
uj
c..><'l
WO
I-~
..5~
w
.!!
'S
rn
Q)
~
.c;
;:::
~
al a:l "0
QJ IV IV QJ
~ ~ ~ c c c
1l 51 1l ~ .8 ~
Vl
.c ~ ~ ~
0 0 0
C C c
::J ::J ::J U U U
"" \0
cxi cxi
N N
"" \0
l'i l'i
N N
Ln Ln Ln Ln Ln Ln
= = b b b =
0 0 0
.... .... .... .... .... ....
Gi
J5
III III ~ ~ III lG .~
~ ~ ~
>- C.
a.
(II
""
"0 fa
.i:: l!! ci Cl
- ':; z ell
Cl
c i III 0
Gl .i.! "\.. Z
...J 0 0:: Gl ~
c e III Gl
0 Cl C III
III "0 c '0. 'S;
III ~ if c Gl
'iij ... W 0::
U -
III (II "0
E 8!. Gl ~ C "0
0 .<: (II c
0 :> en (II
r-. N M 0 E .<: >-
N '*" 0\ '*" co .... a ... "0 .c ~
'*" ... N '*" '*" "2 0 l!! ~
~ ... ~
~ ... IV '*" IV ... ... :i Cl l!.
0 IV 0: 0: IV IV C C
... '2 l!! ell
0 0: '5 IV '5 0: 0: "0 I Cl
8 '5 0: - '5 i Gl Q. Ci5 0
~ - 0 .c; III III Z
€ Cl
~ 0 ~ ~ :> c c c
~ ltI 6l UJ 0 ltI ltI 0 (II (II (II
UJ Z Z UJ UJ en en 0:: 1[ 1[ 1[
e co 0\ 0 .... N M
~ N N M M M M
~ A
....~ ~ ~' CITY OF WHEAT RIDGE
r.,n Building Inspection Division
~ (303) 234-5933 Inspection line
(303) 235-2855 Office' (303) 235-2857 Fax
INSPECTION NOTICE
Inspection Type: ~CT7?/C.4/, :?'-d/,,:;:?tt 51
Job Address/Permit Number: >2;/::- --G> <; rr
-
;:::P4L E/Je:c.:77Z/c H-f
/
[J No one available for inspectioni"\~ime AM/PM
Re-Inspection required: Yes i No )
. "'M =,~- ~~ _...J., "',,' .:fIli~ · "'~,.....
.-/ /_ / I, . /.
Date: 5/-z:JI/O/ Inspector: . i
/ ~ /
DO NOT REMOVE THI
COMMUNITY DEVELOPMENT DEPARTMENT
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office * (303) 235-2857 Fax
INSPECTION NOTICE
Inspection Type:
Job Address/Permit Number:
.t1I,L
"3Ji5 Th~
/"r
07~ b <; ;,
o q jl iJ 1M 1'''-7, ,.IN' 5, b F ,c~ 1. Oce.,'
" ,I ;Jr. {,nf ,r ,c.,~'E /Y;I<"t.
" ~f p~ tI :' rJ.il' ~/v r?lv T..J-i/ [/€/j~'/~tlt.
,I ~/l,H .H/Hff,.! (I:'V ?,':tt,/c
t01' ,1.,,"""7 ';",/,,7" g'r:;/c. /-" n?,rf"K /j!/f.-1'1i-l e."ohL)JW,
C;~"'/v /?/h/!7 f?I ",/c - ",/'.nll'
M [J 6 /1/, .>c-,Jfw': 0/1 ~,fl,," ,..) ,F ,,1/, /j <; ,,"Ot!. It!)
fr" t.){:' UlAII.? Fd -1/$/1',2 Hhwfi'
.,'\ .J /.o'l I /.,/ /
OJ L/A/~ b""'" /.';7 v LJ/C.
,/
.t
o No one available for inspection: Time /c,'d AM/PM
Re-Inspection required: ~' No
'When corrections have been made, call for re-inspection at 303-234.5933
Date: J/I.;/pq
Inspector: ;::,.-c,:
DO NOT REMOVE THIS NOTICE
,
t
I
I
I
t
r
i
COMMUNITY DEVELOPMENT DEPARTMENT
Building Inspection Division
(303) 234-5933 Inspection fine
(303) 235-2855 Office * (303) 235-2857 Fax
~ VlH€-'ll"
~_... _\_..'.~..'6
!::: -".\!I. (;)
() '," I'f\
- -.. --
C'O(OR/'OO
INSPECTION NOTICE
Inspection Type: M/.$'V).AJT7z; ,v
Job Address/Permit Number: .3.2/5 t /J I ( f':r ,-77/)(," =I
"0 M/-'O Ht'nU, /""'/~.4.P4-It/'i.'! Mi'Ju,"""c:> I?'r/uf
AT /1M-HI/ l'i. j:,d~ jl/",,~
/'/",,/2:<("'''- + f?l}.Q,"..-,(o
o No one available for inspection: Time /1.: vi AM/PM
Re-Inspection required:
^--'---'\
Yes ~...J
"When corrections have been made, call for re-inspection at 303-234-5933
Date:
I ,/
fI",;/'-''V Inspector: A::>.J
/
DO NOT REMOVE THIS NOTICE
.'--~"--'-'--'~....._-_._~" - '- - -- - ---' ~'- ._,_..~ - -.-- ...~ _.~ -~-
D Elec. D Plumb. r:;a Mech.
o 1 st 0 2nd
Job Address:.1'..t/cs" 7"15..'1
j) G01 7"'Li:r~. #.1<<;', n,. .~'d,.v" re' /1.,,.,-, "'/)/")'7.;;.<.,:;" .
}) J/.#I/ /!lAlu,(.II"'~";'I./-(...' /y.. J5l? .ijC)'/)",J h'Ji t=Ji' rl/.t_~
t21 Structural
o 3rd
D Other
i
,
,
,
I
I
I
l
,
i
,
t
I
I
if'
'1 ;J I;: A',4//~
Iii) 4thl /,/ /JJi:"( //1/ TR"",'(' <'/'iJ,"
'f" ./. ...-\,'! ".--- J)rA -' ~~_,)" '_'? /1. .---...:
~ i 7U"'''";,,.I, .-1',-,/(" ",..L/.....'.t_~f.{.' -po' -c-
OJ)' . dr' '~'IIr;~
y~~,.,..,{ /1 j1.~r.? $v ~ .r" ~ >~',;
J0 11/.';-' oJIjI .>Fht'<: IA..;./~-/t'~r-;)/'"",;,~/;..' <1;'/
h! ff'1I. J' '" r.7 J:;< .- b'k'
ORe-inspection fee of $ must be paid prior to re-inspection.
o Blocked Access
o No one available for inspection: Time Yo' /,:' AM/PM
.When corrections have been made, call for re-inspection at 303-234-5933
Date: //;'7/0';;
,
Inspector:
/
/
,#'i--...e
DO NOT REMOVE THIS NOTICE
-- _.._._....._~-- -I__.~- .___ ..__~__.~_.,_.~_..._,~_.______ _, _,~~__~,~_._ __._,.~_._....__..__
COMMUNITY DEVELOPMENT DEPARTMENT
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office' (303) 235-2857 Fax
INSPECTION NOTICE
Inspection Type: M5 ,.JII'~ /17''; I.J- ,k;/#.
Job Address/Permit Number: 3';1/5..rRf-" <'I C77?'.:f~3
Aj1jJ~rA I)
/UkPJ7!:',' 57/// A'/5.0k// /v~/L /://f-rz'" /h/ /.?#f?/Y'<:wT~
Uhf! ;,1" Ci! n~
o No one available for inspection: Time //3> AM/PM
Re-Inspection required: Yes ~J
'When corrections have been made, call for re-inspection at 303-234-5933
Date: /J/;!ki Inspector: z;::.
. /
DO NOT REMOVE THIS NOTICE
COMMUNITY DEVELOPMENT DEPT.
~ Inspection Se",;ces Dlv;s;on
ti w. (303) 234-5933 Inspection line
(303) 235-2855 Office
"OLOR.OO CORRECTION NOTICE
o Elec. ~ Plumb. 0 Mech. 0 Structural
o 1st D2nd 0 3rd
Job Address: ;(/ /.7' ..T'€ d er 67tc?5.?
,) ,;~< ~;r- :r-z-> a,c __W/I /Lr/,rv, 2.--j .J;r<;
.2" nu/1/ -;-y::r<7 7-:D /<> ,.., ~_..",v ~.I) -#~
':i') i)~V -f-...,.)f ,)/..Jf TV A~ <~ II.-X,en ~u.cy'./ :s;;:: '/
, / .' /
sUjJ,)~/ ,/ /n/E /~'/T aIL- '#/..L 0 (..- ':i'5.1i ~ ~ C,K
+~r
/-15
I2r Other
'I) Atllf/IV' A/.t II ,J/..?T~ ,.if... /1/l.-?<F~F'""" r
ORe-inspection fee of $ must be paid prior to re-inspection.
o Blocked Access
o No one available for inspection: Time /: {" AM/P~
'When corrections have been made, call.for re-inspection at 303-234-5933 I
Date: /7./"7/"7
f '
/
Inspector: ~,
/
DO NOT REMOVE THIS NOTICE
_"'-'-'-~"~_~~._ __ _ ..__~C____' __.___'~,___.~___ .'.'~'"-'~"""__"'~_'___" _ ,~_..~__._____,_ _.._
COMMUNITY DEVELOPMENT DEPARTMENT
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office. (303) 235-2857 Fax
INSPECTION NOTICE
Inspection Type: EKI"';/ =1/ ,.,-1 f
Job Address/Permit Number: ?;'/> 1/P.'5 ,"7- nce"';
.~
< ,
1)/J4t15'f;<'V~ //..~- T/;:~( ~J!j~:/,,< lv-';,,..,..". f !-:::;r-.;:.c.~~{
1,,1....."!irA-/1 /.,;....:.-7,.c'{. I'll R7,cQ,,7.;'.! ...l -r41?//~ ,,;.:. -),:_3.7,7
j) PAti!",,'./. r-d:' ....vf:.;T ~:07Ni"i(:,.;r::/.,,-~ //t/~,c,4,? ,.i-~?0/Y' t? po,. .n:,
~,vlJ ..~ f /)/l""j{' ;:~Cr'lr~ l-'C t'J(: ....>' ,J
?') r.4,J,f:;") -1 ;'/,<:'< /l<~..,..,T /i'r.:7n~)#I,,-:~,_> IA;' r~;k_.-.J -r ~'/J tt-.r:l~L/,(
J- A/~fA Al5,;lJf ~Jit>.i7 ()C'L.,-<.'
Ii) .1 /}t;;__7 )c.r A,'J/.:" :c/.45lf/~'1'(:-- r /)f--< r,6..,..< ;-i 7.:3'. '"':~
o No one available for inspection: Time
AM/PM
Re-Inspection required: Yes No
'When co"ections have been made, call for re-inspection at 303-234-5933
Date:
Inspector:
DO NOT REMOVE THIS NOTICE
r-
I
l
I
i
f
I
t
I
I
I
I
I
!
I
i
I
;
-
~-.~
""', ..",._,."_.r._,,_,,
COMMUNITY DEVELOPMENT DEPARTMENT
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office * (303) 235-2857 Fax
INSPECTION NOTICE
Inspection Type: /A--nI - ?4i2TJ.4l
Job Address/Permit Number: 3;7/5 IklS eJr. ,<111-070&..:"-:;
,If/~l?/ $/oE /:Q. ,;-,//1" T7C> /ill;, ,<C. S:,;;>,c = r..l,'. A;?,,'
,. ,
o No one available for inspection: Time /0: IS: fi ~PM
Re-Inspection required: Yes No
*When corrections have been made, call for re-inspection at 303-234-5933
Date: .'//'1, /07'
/
....,,/
Inspector: /:;.., c
DO NOT REMOVE THIS NOTICE
1O'~- ~
.
r
COMMUNITY DEVELOPMENT DEPARTMENT
Building Inspection Division
(303) 234.5933 Inspection line
(303) 235-2855 Office' (303) 235-2857 Fax
INSPECTION NOTICE
Inspection Type: AtlhN7 ~A{J7/-4i
Job Address/Permit Number: ::t?/5 :rl<,> L'"T / /?7CZ~
l/J.,'T /~,:-~ /~A'./A/r-l""""';/}-,.v'{.
.!... Jk'
/)~ . .;V./-,';;,')../ }-,;=,'k- - 0
o No one available for inspection: Time
AM/PM
Re-Inspection required: Yes No
'When corrections have been made, call for re-inspection at 303-234-5933
Date: /II, //~7
",
Inspector: ~-:'I-:
/
DO NOT REMOVE THIS NOTICE
I
!
~
i
,
,
,
f
I
f
,
f
I
r
,
,
I
r
I
I
I
I
I
I
,
~
I
I
f
I
o Elec. 0 Plumb. 0 Mech. 0 Structural 0 Other
o 1 st 0 2nd 0 3rd
Job Address: ?2/S ,L,I(/< (""'1, I'.d ?"J'/t/;',,~
""~A-1 ,Lid! I3Mt'.&",t"f ME-fv .~A/ .AC'{'F5"f' A&;.vE
/0 / F.//? ,IV /.?</<;?'<('7" ,c/A ,... rFI.lM.&. /~,",FL
ORe-inspection fee of $ must be paid prior to re-inspection.
o Blocked Access
o No one available for inspection: Time AM/PM
'When corrections have been made, call for re-inspection at 303-234-5933
Date: /O/;'~7 Inspector: /~
I ,
DO NOT REMOVE THIS NOTICE
--'-~ _.c.,-"_~_......c."".~~_'.'-"._'_._"'_~'__ ..~",__._______._~.'"-_~ __,__~~__,__._,_, .m_'___.___~~___~~~__.,_~.._
I
1
o Elec. 0 Plumb. 0 Mech. 0 Structural 0 Other
o 1 st 0 2nd 0 3rd
Job Address: 1J/5 T~/( ~T. {J..t:P 070C53
;) ~EoF !'":hI:> ovtt<. ShtA./A/~,;> <-'" 0/5 /-.'#I</E.::'>
t) IV'~F(;> rv F,;Jf R/H.K PU<t!.tI {0/"h<A/' '" 7<>~ +.. /& '
//J! 71/' fET WhA//Jr;~/\.+ ./VK;JI' ,:;/<
/.B71!': ~AA. #""'/'"" ;f j. ( S DA/~' '>I"E
"'1/#/,, oJ! - jJ~cll &/...",,,,,>
0","
0/< - 0)1
,
i
I
!
I
.f
i
I
I
i
,
i
ORe-inspection fee of $ must be paid prior to re-inspection.
o Blocked Access
o No one available for inspection: Time AM/PM
'When corrections have been made, call for re-inspection at 303-234-5933
Date: /0 j~'o-r
Inspector: /e-
DO NOT REMOVE THIS NOTICE
_.~~"--~._._~~.,--_.~-_._----,.,-~----~ ~__------.c..___._~__ ___ _~_~___i__".-'-._,___._,_.~_________
......".....
o Other -
,
'-f
("'7<::::')'1 ~--
-
.
l/tAf~J/ /) r (~~
'tt
oRe-inspection fee of $ must be paid prior to re-inspection.
o Blocked Access
o No one available for inspection: Time AM/PM
.When corrections have been made, call for re-inspection at 303-234-5933
Date:q-/l~ D' Inspector: _Jrf:,
DO NOT REMOVE THIS NOTICE
"!I!'j.,,,,~, lk""''''''''''''-'' ~, "',..,~"'",..., lJ.l,.,1 !JIll",,", ,l_l!l'~ J,!LJ.,41!"""".",4J\l1',J,llIJ,.Jl..;~IIUI! 1\1 m.,IlI~,..,,,.,, .w"w~ " !lJJ 'W_' ''" j111,;"'ll~\\'~
.~~A.(
~
City of Wheat Ridge
Residential Fence PERMIT - 080497
PERMIT NO:
JOB ADDRESS:
DESCRIPTION:
080497
3215 IRIS CT
177 Lineal feet of 6' privacy cedar
ISSUED:
EXPIRES:
fence wih 112"
OS/20/2008
ea gates
** * CONTACTS * **
owner 303/423-2561
gc 303/289"4388
Lou Mar Entities
08-0097 AJI Fence Ltd.
** PARCEL INFO
ZONE CpDE:
SUBDIVISION:
**
UA
0628
USE:
BLOCK/LOT#:
UA
0/
Permit Fee
Plan Review Fee
Total Valuation
Use Tax
** TOTAL **
ESTIMATED
FEES
126.50
82.23
.00
59.69
268.42
PROJECT VALUATION:
3,316.00
** FEE SUMMARY **
~
Signature of contractor/owner
date
1. Thlsp~rmit was issued in accordance with the provisions set forth in yo~r application and is subject to the laws of the
State of Colorado and to the zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable
ordinances of the City.
2. This permit shall expire 180 days from the issue date. Requests for an extension must be received prior to expiration
date. An extension-may be granted at the discretion of the Building Official.
3. If this permit eXpires, a new permit may be acquired for a fee of one-half the amount normally required, provided no
changes have been or will be made in the original plans and specifications and any suspension or abandonment has not
exceeded one (1) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall
be paid tor a new permit.
4. No'workof any manner shall be done that will change the natural flow of water causing a drainage problem.
5. Contractor shall notify the B~ildin9 Inspector twenty-four (24) hours in advance for all inspections and shall receive
written approval on i~pection card before proceeding with successive phases of the job.
6. The issuance of ape i the approval of drawings and specifications shall not be construed to be a permit for,nor
an approval of, Yo tion of the provisions of the building codes or any other ordinance, law, rule or regUlation.
All plan review eet'to field inspections.
Signature of Chie
date
INSPB~TI~ RKQUBSTLINB.
REQUESTS MUST BE MADE BY
(303) 234-5933 BUILDING OFFICE: (303) 235-2855
3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
City of Wheat Ridge Building Division
7500 W. 29th Ave., Wheat Ridge, CO 80033
Office: 303-235-2855 . Fax: 303-235-2857
Inspection Line: 303-234-5933
Date:
Plan #: () f -Plr;J
Permit #:
Building Permit Application
Property Address 3 ~ I ') I R I' 5
Property Owner (please print): L(J u. . MV<. ('
Mailing Address: (if different than property address)
CJ.
E t) r-/ f-/e ')
Phone 301- <../J.5/)Jeol
Address:
City, State, Zip:
Contractor:
I{JI. N/IJ(f? lfd
Contractor License #:
Phone:
103 - ;2 '61~4j<(fg
Sub Contractors:
Electrical City License #:
Company:
Plumbing City License #
Company
Mechanical City License #:
Company:
Exp. Date:
Approval:
Exp. Date:
Approval:
Exp. Date:
Approval:
Construction Value: $,1~ I (q.()()
(as calculated oer the Buildina Valuation Data sheet)
Plan Review (due at time of submittal): $ !~ .
Use of space (description):
Description of work:
117 LiNE'^-1 f=c.-e.+ () F ~ ( ?~;,VUL'i
c..u:l\XR (-eJ\j(t( LJrth '\~ t~ G~fe!s
Sq. Ft./L.Ft added: Squares
BTU's
Gallons
Amps
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances,
rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and
allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full
responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for work
under this pennit. Plans subject to fi~_~~ inspection. \
D:te.OS}fM
CIRLCE ONE. (OWNER) (CONTRACTOR) or P RSONAL REPRES
PRINT NAME SIGNATURE.
DEPARTMENT USE ONLY
ZONING COMMENTS:
Zoning: 1-'
Reviewer JIf ') (11 f 0'0 J!=--
PUBLIC WORKS COMMENTS:
Reviewer:
BUILDING DEPARTMENT COMMENTS:
Reviewer:
OCCUPANCY:
FIRE DEPARTMENT:: 0 approved wI comments 0 disapproved 0 no review required I Bldg Valuation: $
'''', j, /1'11
~/ I II i
I I' I
,." 0 1 ,~I--''''----'
""I ,1/ I,. ,---__~i I
t fl.1 i:i
" .1- ""
~ I, i
~ ..": III
, HH_ /,f-"
l -~Il'. ......
".. ,~+,,~~HT--.l
",,_ J/lll~ 1
~ III"..
'''vf//ii...i .'.
,11-4
I III ii',
I ....]
~, ,o..~
-,-~'-,~!
""'0..0'.'
o~.
o
,
------------
M ,,9~.e~oi'9 <;;
,~o~n
IdA.L1 ,m ,~
Id;'l.l;on.<;
--.,--
[~
~ .~.?"....,J...;O,;;.
: "o.,~.-
'~o'\'.':"
I
'0""'"
....... I
-::;','
... .il-J' ~l-T . ~
"'I .J][];r:t ~",;,:~ JI . n ~
.._... .,,'" I '~ - i:i
'"
z
o
rttfj:'
:\~:
: d S ;O~'~,)
ZLO'1
,...
'./j
M ,,9~,6L69 S
,1O';U
f1.O'l
"
. .
aJI
>>>
BILL TO: SHIP TO:
JOB SKETCH
Lou Mar Entities Lou Mar Entities
3215 Iris Street 3215 Iris Street
Wheatridge, Colorado
166' 6' high lx4x6de Bloc Fencing
Iris Ct.
AJI FENCE, LTD
909 E. 68th Ave
Denver, Co1orado 80229
(303) 289-4388
+N
3215 Iris Ct
6.5'3.5'
4'
22'
~
4
40'
40'
100'
05/19/2008
COMMUNITY DEVELOPMENT DEPT.
~ Inspect;on S.",;ces Dlvls;on
1J ~ (303) 234-5933 Inspection line
(303) 235-2855 Office
"O'OR~QO CORRECTION NOTICE
o Elec. 0 Plumb. 0 Mech.
o 1 st 0 2nd
Job Address: 321 S T,J /( "7 '
o Structural ~. Other
o 3rd
C,-7"", 6 ( ::;
.;:::~('Tt:/''''; /.J-"';/ /,..c,/,,/ //.~~--)'-..t'//A--T--/-);V ;!.; /l)/N,,,'.C:d/?- -;-~-
/ (. -- uk b;.!Ir>~
oRe-inspection fee of $ must be paid prior to re-inspection.
o Blocked Access
o No one available for inspection: Time JAM/PM
'When corrections have been made, call for re-inspection at 303-234-5933
Date: l In / ,;.' P
Inspector:~-.-
DO NOT REMOVE THIS NOTICE
:...c-.-.._.o....-o-..~~__-'---~_._......_-------'----"-..----~. -,-.----.~~-~-.~---'-..~-.~'---~---. -~---.~---.-_....:.. -. -_.'- .__.~.
ru
I
I
,
,
i
I
,
I
I
I
I
I
,
COMMUNITY DEVELOPMENT DEPARTMENT
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office' (303) 235-2857 Fax
INSPECTION NOTICE
Inspection Type: k<n( rd ~~
Job Address/Permit Number: "3.#15 IA/~ (Or //770lj~
;1#-47">.>11.. - kif ;;=xt'I'.I'T Pr. r.:ASJ/5 y.>lllL>VE ,K. 0.4',,' A-ti'CH
o No one available for inspection: Time /0:1"0 AM/PM
Re-Inspection required: Yes No
'When corrections have been made, call for re-inspection at 303-234-5933
Date: 11,h7ft,7
Inspector~",
DO NOT REMOVE THIS NOTICE
" k
"i,~",t'
~"
s:~ .
070653 ~~~". '
"" ".~~~~~-
I$$UlW, 0~/2i/2()(l"l' r-~ C~ .' ~
mc~IRlIlS: i2/26/20~7::'. I '.'~ ~ .t
. .. 6t.
""., " ,,'.: ' ,
'0'" ",. , "
H ' I '"
':i::.' ;"";'Ri'.
CltY~;hWheat: die
,', ", 'I,; , "", ,:,
; Re.. ..SFR P
. ., ' .
07065~. <j, "I',",
3215 :Iria ct.:
New singlepl~ly Resident.
.: ' . , . , '.,' ":" ,.-",:. ;;~: if:: , '
~ .: ,{_ ,':1; ':~.i~:~ :'
,LoU-Ma:z: _id. ~ .
01';9638 IoOU+Mar eo6..l:~ion
01-8637 whards of' Wet~$,j
02-0636 P &,M P1~i~i:r.n(,.
,,' "
') ,...]\~*,> '.~:i:~:" ~~' ~t:-,~";:;~: :l~;:;. ,,:,:, j
~03),lU;3-0~,91,:.~ Ficco :,'
~03/11l63-0.i,l:r '~1liladoFiccci
~o3/797-6!;76
,~03/ho-90s4 ~li\'!.ti Trudell
,:,lji"
;~, ; ,"
"J
:,"
",'i'
USE: ,.--3
aWcKtLO':L'#: ~/'
j;:s:r.t~$: ~T.~I,6N:
,mS
1&0.00
" , niL 9$
2'~3~:~~ ..:.~,I, ~~.~~. .
. 9,~OO.OO. ~~
17A~~,37;
,ll~
',,'
,."
,.'
;"-
, '..'
, .', ','!'
,''',:, , ,"--,.t- ',: i "t, ,-'." ,", ',' , , ;
GJ:1llE\d ,& ;t'OQ;f'.,aiain' direct.d in IlU~ a
acient prop.!!:t:ii;~~: $ej!! fttachEod she.es.
- """,'" .
.
",':,',;"}',.
m~el:"'Q
-c': '1':',
;, '-," : ,': :.,::,: -..:
, . ...... al'Jill~<:abl.
': '.' 1, ,.;~t ~ipt ,: ','
., :PfJ;at~ 'In ehi. .
ri~ 011 ';""he< .
.1:" ,,-- .
,:,'
,. ;1. '
. v .
,,1','"
'i~l: .
~'i :"- '
;':~':;',," ,,"." ' ':, if"" : ';,: ",' . ,';,:'::~:>;:~::r:.,pi,<:;,,:,',::'.,.:;.::'
:.~~'''~',~~~'' 'i..ued, lin, ,::"t1~~ei,with the' prc;!v1s~ .'~: fprth i~ .yoUX': applicatior/., ,&tld ~8 st,tijj'e~~ ~~'t~~"l~.,:,pf :~~'
.;'*iirbf~ ~r ~'r~~~119 ~ogulation. '1"d llui1-~~ ~ o~ ""e.~ Ri<1g', co~~r_ o~~ pFt'awJ.i~l"
., '~.~.. a&ll'_ir,,:~.' 010 the 'tooue :<lat.:.."....t. for "'" ext_ton,_t:he ""oe;......~o~ to' .-q>ir.t:ion
; f :i~~:~~.i,(ln, ~J>e':: ., ':" A~' the, Qisere~1cm,~t~"J:,~ BUf~~fig'.,offictal. : , ,:;,,::','::' ',;., ',:'\:,.j. ,.:' :~: , '"
:;~+lifj ~~I:l:, ~.:I.re8", "a ',' "t" ~y be aC<I4;iired.,~~.,.; :fe.: of Qne.tlalf. the' ~t', nottllally ~~+ ;.~+~~~: ~':, ,
.1,~:fe.":been 'Or ,\rIi+l '~:,.b'1.: the ori.gina~ llltri.~,~ ~~it1C1t.on8';'apd. ~y' .U8peXia1on,Oit':~!fin":(~',~~~ :tH~'.q~t
, ,ll!le. ;(it Y""r."l: " ",have been ot U ou.~"n pr. 4ban4Onment exce_ Q~e (11 _.... .f""..Ijo'l
'it!(~ie.'. rniit . " '.',. " " , .' "
, ~1ii:'f' ~xw":"::r ~l b<>. t""t will clWuig.. tbjo''''t~ holl ~f ...ter Q.""i~ a dr"in.~ iP ' } , '
,:tt~f',:~~U: ~ttty; , , : Inspe~tor twenty-~, U~4;~:: ~Ui:~ .~n a~v~'c~__ tor ~11 :in~l~, . '," :,::,~lil. tr~1V~ ~ i
t,.,.i)pNv41.Qtl 1, .,betore proce,E1d1ng'w4.;,th":$~."i9:pha",."Of ~'jco.: . ..j"";." '~">.';' .:.:' ::, .
" ,,"', __~f'." .'Ovll' of 'clt:.w~ng.'~{~r:.t~*~bi~~,.,:tiln+i.i,'not: ,bi 'cl:on.t~e4:'~:;114t:al~ff,9~~: UOf'
dt", ,p~O*l'1sioPB ot' the' ,~~:):d.,itij~... ~ ~~', othe~ oz::d.inance, ',l~.: '!(1J18 ,or' ~.t:':10tl,;
"':~ "lnepeetions. , . i ' " ',' ;;y;' ,:',',
~" '0' '
'aa'te:
, .
~l~~i,i!i~
;'..'" .:
,,;J!"!i.. '
.,k
;",'~t~~:'
"".. , ,
to'l'ett)'
~ote: \Ocat\!\~ 'i' to Ihe
l'lel'se "b\e lOt ,cCOt,,'I\r,'otdS.
nOnS\ n\~ .- ct:'Si-\'\' . n
\s tesr" O".e"'. roet'.t, r ",,1'\\0
jfa.Ctot. \"''i't ,~e\o'i" \1\,0 . 0:\
1 con: lrUcti,t\\!, . ted uc" ,ccotute s1roetk
(l'IIt'etalld coliS alId tCll~~\e lOt ,n:~ d all'! CO!'> "\011.
\\lIes to'ied 'i'\~ tes'i'OIlS' \alI sct ~"tc \r"J"~"
e'i"i' OW \s IIO.Ih\\\ Ille 'i' '" \1I"cca
"\'he b",\tted 'i>'~o\t\lIl1 {to
s'U tS te
ettO
'fY
lliCll spa?' to
uf8CWf9/", 'Ii instal~l b8
t\1B I11snllSve ~ gllst. s
nts frol11 ~'.:....d wi C
DoCII~ng 111~1lree-~n. .16
tI1St t 1 00 ~ roof inSP""'"
111e6 tor flnS
onslte
PRESCRIPTIVE ENERGY CODE
Replacement bollerS/fumaces - Minimum of 80% AFUE
Boilerstfumaces in new conslruction . M,olmum of 90% AFUE
Setback Thermoslat required (Excepi 'or Hydroruc Heat)
Gas Water Heaters. Minimum of 60 Energy Factor
Electric Water Heaters. Minimum of .93 Energy Factor
Insulation reauirements. _ R-21 Walls _ R-38 Ceilings
- R.19 Crawl Spaces _ R-19 Basement walls
DRTVF.WA y REOTTIREMF.NT~
Section -26-501 (0, I)
For One..[)r two--family dwellings. the first twenty-jive
/eet (25' of driveway area from Ihe existing .dge of
pavement into the site shall he suifaced with COIIt:nt-.
asphalt, hf-ick pavers Or simi/Q1" materials.
. ~: mcjfR/
City of Wheat. Ridge Building Permit NU~be(tr.1C kh3l
Community Development Department Date: -~
SINGLE AND TWO-FAMILY----
BUILDING PERMIT APPUCATION
Property Owner: Lov - M.u ,!' /1 .f., f; """ J
Property Address: 30115 {~ d-
Contractor License No.:
Company' / " .".
. ~ u......-- Lv,'-t!,),fro.-cA!-eJ,
"-~~ WHr"r 1',
~ 0
- ~
u ~
, C'OLORI'-'\:P
Phone: ?OJ- ~G 3-u'i&-jf
~
Phone: 303 .. ~'-<I-(,C. 7/
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEME
Buildmq Dept. Valuation Figure: $
I hereby certify that the setback distances proposed by this permit application are
accurate, and do not violate applicable ordinances, rules or regulations of the City of
Wheat Ridge or covenants, easements or restrictions of record; that all measurements
shown, and allegations made are accurate; that I have read and agree to abide by all
conditions printed on this application and that I assume full responsibility for
compliance with the Wheat Ridge Building Code (I.B,C) and all other applicable Wheat
Ridge Ordinances, for work under this permit. Plans subject to field inspection,
(OWNER)(CONTRACTOR): SIGNED
DATE
Value:$S50rOoo
Permit Fee:$
Plan Review Fee:$
Use Tax:$
Total:$
(OWNER)(CONTRACTOR);PRINTED
Use of Space (description): New
Description of work:
DATE
S;,,,I;- r;~i~ Rc:..s
fiECEU~\E.\lJ)
JUN \ 2 2007
-----
Sq. Ft. "added
BUILDING DEPARTMENT USE ONLY
S
q.Ft.:
~ /\ :I:
\-~1/0
,1.-
Ii>
BUILDING COMMENTS:
Approval: ' c.5b8/Ecr ?B ,c;~D /~~C7-<.J:S
"ZOO?~po
PUBLIC WORKS COMMENT '. ,
Approval:
ONING COMMENTS:
Approval:
Zoning:
IRE DEPARTMENT COMMENTS:
Approval:
Occupancy:
Walls:
Roof:
Stories:
Residenllal Units:
Electrical License No: r" ,J:)<,.
Company: VIlI1(!"# c:..'~ v.'
Expiration Date:
A roval:
Plumbing License No:
Company: ?'" y1/1 ?t..,.,,,, l,;, ')
(1) This permit was issued in accordance with the provisions set forth in your application and is subject to the laws of the State of
Colorado and to the Zoning Regutations and Building Codes of Wheat Ridge, Colorado Of any other applicable ordinances of
the City.
(2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building
authorized is suspended or abandoned for a period of 180 days
(3) If this permit expires, a new permit may be acquired for a fee of on~-halfthe amount normally required, provided no changes
have been or will be made in-the original plans and specifications and any suspension or abandonment has not exceeded one
(1) year. If changes have been or ifsuspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit.
(4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
(5) Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written
approval on Inspection card before proceeding with successive phases of the job,
(6) The issuance of a p.ermlt or the approval of drawings and specifications shall not be construed to be a permit f.or, nor an
approval of, any violation of the provisions of1he building codes or any other ordinance, law, rule or regulation. All plan review
is subjectto.fjeld inspections.
Chief Building Official
rib: vt~D)U/
City of Wheat Ridge
Community Development Department
SINGLE AND TWQ...FAMILY
BUILDING PERMIT APPliCATION.
Building Permit Number:
Date:
Property Owner: kv - Mc.r e/1 ./-J; ~J
Property Address: 3'115 ..::Lr.S c..-i-
Contractor License No.: ~.
Company: L"'-"-Wlc.r C;:"/1 sf,~c_./--(J~
Phone: 303-~' )-cIf frY
Phone: ~D3- !,"(.<j-<<. 71'
Buildina Dept. Valuation Figure: $
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are
accurate, and dO not violate applicable ordinances, rules or regulations of the City of
Wheat Ridge or covenants, easements Of restrictions of record; that all measurements
shown, and allegations made are accurate; that I have read and agree to abide by all
conditions printed on this application and that. 1 assume full responsibility for
compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat
Ridge Ordinances, for work under this permit. Plans subject to field inspection.
(OWNER)(CONTRACTOR): SIGNED
(OWNER)(CONTRACTOR):PRINTED 'I
Use of Space (deScriPtiO~): IV e.w
Description of work:
DATE
Value:$S50(Ooo
Permit Fee:$
Plan Review Fee:$
Use Tax:$
Total:$
DATE
s; n~ (,. ~/~ ((c:s.
fiI.CEU\?ED
jUN , 2 2007
-----
Sq. Ft. added
BUILDING DEPARTMENT USE ONLY
S
q.Ft:
ONING COMMENTS:
Apprwal:
Zoning:
BUILDING COMMENTS: .
Approval:
\
- t..,,61tA-'b,AJ6r s:1-I1!-U.- BE P~~Q ~ k!.6oF bR.+-uus
OIIeECrti:'7> /41 Suc.H ,., ""/hVHc~ -+-:s ilf N.4VZ;;: NO Ng';,. /""
PUBLIC WORKS COMMENTS: ,\...,. ' . I. e>N -"flhr~T ~t>~E3 .
Approval: e>1t!. ~6 r,j/lfID"7
- I / - SEE: .rfTi~~ s/IcL......J-S-
IRE DEPARTMENT COMMENTS:
Approval:
Occupancy:
Walls:
Roof:
Stories:
Residentiai Units:
Electrical License No:
Company:
Plumbing License No:
Company:
Mechanical License No:
Company:
Expiration Date:
Approval:
Expiration Date:
Approval:
Expiration Date:
Approval:
(1) This permit was issued in accordance with the provisions set forth in your application and is subject to the laws of the State of
Colorado and to the Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable ordinances of
the City.
(2) This permit shall expire ff (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building
authorized is suspended or abandoned for a period of 180 days.
(3) If this permit expires, a new permit may be acquired for a fee of on~-half the amount normally required, provided no changes
have been or will be made in-the original plans and specifications and any suspension or abandonment has not exceeded one
(1)year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall be paid fora new permit.
(4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
(5)' Contractor sh.all notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written
approval on inspection card before proceeding with successive phases of the job.
(6) The issuance of a permit or the approval of drawings and specifications shall not be construed to be a permit tor, nor an
approval of, any violation of the provisions of the building codes or any other ordinance, law, rule or regulation. All plan review
is subject to'field inspections.
Chief Building Official
Residential Worksheet
Address: 3z IS I y', 'S c+
Zoning: R -I Property in the flood plain? fJo
Lot Size: \1. ,9:)", sq. ft. Lot Width: 100 ft.
Maximum Lot Coverage:
2s
% "'-------
~11 G
sq. ft.
sq. ft.
sq, ft.
sq. ft.
sq. ft.
& -t,o"I, ,,(d, -:: )'-l~\i
Existing Improvement(s):
House: sq. ft.
Shed: sq. ft.
Detached Garage:
Other: sq. ft.
sq. ft.
Proposed Improvements:
House:
Addition to House:
Shed:
Detached Garage:
Proposed Lot Coverage: (Total) z'~ .:)
%
"$ '-I '-. Z Z-sq. ft.
Required Setbacks: FR :SO S I ') , S IS , R I') ,
Provided Setbacks: FR 'SO' S IS' S "2-"2-' R Lfo I
Maximum Height: 7)< ft. Maximum Size: sq. ft.
Proposed Height: 3$ ft. Proposed Size: sq. ft.
--\; 'j ,-, J ~
Access Notes
For one and two-family dwellings, the fIrst 25' of driveway area from the existing edge of pavement into the site
shall be surfaced with concrete, asphalt, brick pavers or similar materials.
For all uses other than one and two family dwellings, no vehicle entrances or exits may be closer than 25' to any
property line, except when used as joint access for two or more lots.
In residential zone districts, curb cuts shall be at least 10 feet and not more than 24 feet in width.
One and two-family dwellings may have horseshoe driveways, provided that the street accesses are at least 30 feet
apart, measured from the interior edges.
For all uses, one access point per property is permitted.
LandscaDinl! Notes
For one-and two-family dwellings, one tree for every 70 feet of street frontage is required.
100% of the front yard and 25% of the entire lot must be landscaped prior to issuance of e.o.
Street trees required: __
Street trees provided:
DEPARTMENT OF PUBLIC WORKS
DEVELOPMENT REVIEW FEE STRUCTURE
FOR BUILDING PERMIT APPLICATION
".J
, ~\
~\ '-II
~
._:>-- '..., l~ .-
_"'
Olyol_t_
Department of PubIc Works
Date:
Applicant:
6u
/
hl~,'
Phone #
12h5 - c4'lcl
Purpose of Construction:
321 S r.e-ts C?r.
SF~
Location of Construction:
Single Family
x::
-
Commercial
Multi-Family
DeveloDment Review Processine: Fee:................................................ S100.00
(For document processing)
$ 100.00
Sinele Familv Residence/Duplex Review Fee:..................................... $50.00
$ 50.00
Commercial/Multi-Familv Review Fees:
. Review of existing technical documents: .......................................... $100.00
$
. Initial review' of technical civil engineering documents
(Fee includes reviews of the I" and 2" submittals):.......................... $500,00
. Traffic Impact Study Review Fee:
(Fee includes reviews of the I" and 2" submittals): .......................... $200.00
$
$
I Each Application will be reviewed by staff once and returned for changes. If after review of the second submittal changes have not been
made to the civil documents or the Traffic Study as requested by staff, further reviews of the Application will be subject to the following
Resubmittal Fees:
. Resubmittal Fees:
3"' submittal (1, initial review fee):.................................................... $250.00
$
4" submittal (full initial review fee): ................................................. $500.00
$
All subsequent submittals: ................................................................. $500.00
(Full initial review fee)
$
TOTAL REVIEW FEES (due at time of Building Permit issuance):
~ /50.00
PLEASE NOTE THAT IN ADDITION TO THE ABOVE FEES, TIffiRE WILL BE ADDITIONAL LICENSING AND
PERMITIING FEES REQUIRED FOR CONSTRUCTION OF IMPROVEMENTS WITHIN PUBLIC RIGHT-OF-WAY.
S~~t'R" Applla" 7? I-
0--/
Date 7/q/()7
Rev 5/07
DEPARTMENT OF PUBLIC WORKS
SINGLE-F AMILYIDUPLEX
BUILDING PERMIT APPLICATION REVIEW
.~-..
City of Wheat Ridge
Department of Public Works
Date: Go- /ta/07
.
Location: 32/5 :r~S e:r-.
ATTENTION: BUILDING DEPARTMENT
I have reviewed the submitted application documents to construct a .s Fi2...
to be located at the above referenced address. Please note the summary comments below.
I. / Drainage:
a. Proposed Grading/Drainage Letter & Plan required: Yes v'No
b. Lot drainage/grading to be reviewed by Building Division: ,../
c. Site drainage/grading plan have been reviewed and are: -l,LOK _ NOT OK; refer to
stipulations.
2. ~ Public Improvements to be completed:
a. street paving/patching:
b. curb & gutter:
c. sidewalk:
If not, the amount of escrow taken: $
Items escrowed for: IU l;r
The Planner informed of the Escrow Agreement:
Yes
Yes
Yes
vNo
.,./ No
~No
AIM
iV/A-
3. ,../ Does all existing roadway/alley R.O.W. meet the standards of the City: """"'-Yes
If not, what is required? IV 1Ft
IfR.O.W. is required, has the deed been received: Yes No
No
4. .......- APPROVED: The Public Works Department has reviewed the submitted material and hereby approves
this Permit Application, subject to the above and/or attached stipulations.
;}~-4~
Signature
David F. Brossman. P.LS.
(,./18,/07
Date
5. IIJj.t{ NOT APPROVED: The Public Works Department has reviewed the submitted material and does not
approve this Permit Application for the rcason(s) stated:
---
Signature
David F. Brossman. P.LS.
Date
6. ./' Stipulations: I!-F bE.AI-vS Sl-f-tf-U.- GtE :J>1R.ec.,~ 'f-' 4:>T ~ /~ S~ 13~
P~t;;?) /"" Sc.v:H fl 1"f/hv-..:ti3C.. /t:s 70 NeT N,&7...-, 1..-t1'Ae:T
~tY;:rl:> 0..'0'-'6.- tJ kfJt31A7 8S .
7. V'"' A Drainage Certification Letter is required prior to the issuance of the Certificate of Occupancy (e.O.)
8. ~ NOTE: ANY DAMAGE TO THE EXISTING PUBLIC IMPROVEMENTS AS A RESULT OF THIS
CONSTRUCTION IS TO BE REPAIRED TO MEET CITY STANDARDS BY THE PERMIT
APPLICANT PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY.
DEPARTMENT OF PUBLIC WORKS
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80033
(303) 235-2861
FAX (303) 235-2857
LETTER OF NOTIFICATION FOR PUBLIC IMPROVEMENTS RESTORATION
DATED
(,/1~/()7
ADDRESS 3'2.105 rR-ls Cr:
Dear Contractor:
In conjunction with the approval of the building permit application for the above referenced address, this
letter is to inform you that all existing public improvements located along the frontage of said address
shall be restored, (if damaged from related construction) to an acceptable condition, as determined by
City of Wheat Ridge Public Works Department, and prior to the issuance of a Certificate of Occupancy.
Prior to any construction commencing, the City's representative will conduct an onsite inspection to
determine the existing condition(s) of the public improvements at this address.
If you have any questions, please contact me at 303-235-2864.
Sincerely,
:2., ~ '7.d
fl. --
David P, Brossman, P.L.S.
Development Review Engineer
Cc:File
Rev 4/03
City of Wheat Ridge
Community Development Department
Memorandum
....~~ "'HE~r 1'/
... '"
- '"
U '"
CO( OR~1l9
TO: Building Contractors
FROM: Planning Division
SUBJECT: Items to be completedlNew Single- or Two-Family Structures
DATE: 13 April 2005
Listed below are a few items to consider while finalizing construction of a single-or two-family
structure. Before a certificate of occupancy can be issued for a new single-family or two-family
structure, the following items must be complied with.
1. If a driveway is proposed, the first 25 feet of drive surlace area must be paved. The
driveway may be surlaced with asphalt, concrete, brick pavers or similar materials. The
driveway must abut the existing edge of asphalt on the street, which may require paving
within the right-of-way. If paving occurs within the right-of-way, a right-of-way permit is
required from the Public Works Department.
2. One street tree must be installed for every 70 feet of street frontage. If the structure is a
corner lot with frontage on two streets, each frontage is subject to this provision. These
street trees must be at least 2 inch caliper specimens.
3. One hundred percent of the front yard must be landscaped, excluding driveways and
sidewalks. The front yard is defined as the first 30 feet from the front property line
adjacent to the street.
4. At least 25 percent of the entire lot must be landscaped. The front yard landscaping may
be counted when calculating this figure.
5. No more than 50 percent of the landscaped area may be comprised ofturl. Low water turl
(such as buffalo grass, blue grama grass and tall fescue) is encouraged.
6. No more than 35 percent of the landscaped area may be non-living material, such as rock
or bark. Living materials planted within rock or bark beds may be excluded from the non-
living calculations.
7. If the landscaping cannot be completed due to inclimate weather, an escrow must be
submitted for the estimated cost of landscaping installation and quantities. The escrow
shall be in the form of 125% of the value of the required landscaped area.
8. It is possible that the Public Works Department may require either construction of curb,
gutter and/or sidewalk or that an escrow be submitted for the full amount of these public
improvements. It would be beneficial to contact the Public Works Department to discuss
the potential for public improvements.
9. Any fence, outbuilding, shed or detached garage will require a separate building permit.
If you have any questions regarding these or any other requirements, please contact the Planning
Division at 303.235.2846, or go online at www.ci.wheatridge.co.us