Loading...
HomeMy WebLinkAbout4190 Dudley Streetapplicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have Yes been authorized by the legal owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Person Applying for Lisa Wilkie Permit Email not displaying correctly? View it in your browser. From: no-reolv(alci.wheatridae.m. us To: CommDev Perm is Subject: Online Form Submittal: Residential Egress Window Pennit Application Date: Monday, October 25, 2021 11:34:05 AM Residential Egress Window Permit Application This application is exclusively for RESIDENTIAL EGRESS WINDOWS ONLY. YOU MUST ATTACH A VALID CREDIT CARD AUTHORIZATION FORMAN D ENGINEER LETTER STAMPED DETAIL SHOWING THE U -VALUE OF THE WINDOWCUT IN ORDER FOR THE PERMIT TO BE PROCESSED. Your Permit will be emailed to the email address provided below once it is processed. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN WORK UNTIL PERMIT HAS BEEN ISSUED. Is this application for Yes existing EGRESS window(s) needing vertical cuts only? PROPERTY INFORMATION Property Address 4190 Dudley St, Wheat Ridge, CO 80033 Property Owner Name Larry O'Hayre Property Owner Phone Number (enter WITH dashes, eg 303-123- 4567) Property Owner Email Address - Do not enter a contractor email address Attach City of Wheat Ridge Electronic Payment Form - "DO NOT ATTACH A PICTURE OF A CREDIT CARD" 191819m, PA I016YE! Field not completed. WR EPF- 10-25-21.Ddf CONTRACTOR INFORMATION Contractor Business Brighter Basements Inc. Name Contractor's License 120254 Number (This is a 5 or 6 digit number for the City of Wheat Ridge) Contractor Phone 303-777-7130 Number (enter WITH dashes, eg 303-123- 4567) Contractor Email permits@brighterbasements.com Address Retype Contractor permits@brighterbasements.com Email Address 01 :K161 Ci 191 [*] 0 N] avOLe] N :/ Number of EGRESS 1 windows being replaced Location of EGRESS Bedroom window(s) being replaced (for example, master bedroom, kitchen, bathroom, etc): What is the u -value of .28 the EGRESS window(s)? City of Wheat Ridge requires the u -value to be .30 or better on windows. Attach copy of 4190 Dudley St WR 80033 ndf Engineer stamped letter showing vertical cuts detail and u -value Project Value (contract 3850.00 value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with JIJ A0 PERMIT:W�j� ADDRESS: qmoDuAltols JOB CODE: INSPECTION RECORD Inspection online form: http://www.ci.wheatridge.co.us/inspection Cancellations must be submitted via the online form before 8 a.m. the day of the inspection Inspections will not be performed unless this card is posted on the project site Request an inspection before MIDNIGHT (11:59 PM) to receive an inspection the following business Foundation Inspections Date Inspector Initials Comments 102 Caissons / Piers I 'J r1J 103 Footing / P.E. Letter 203 Sewer Underground Ext. 104 Foundation Setback Cert. 204 Plumbing Underground Int. 105 Stem Walls 205 Plumbing Underground Ext. 106 Foundation wall Insulation d 206 Water Underground Do Not Pour Concrete Prior To Approval Of The Above Inspections Underground / Slab Inspections Date Inspector Initials Comments x %,"t 201 Electrical/ Cable/ Conduit I 'J r1J 202 Sewer Underground Int. 203 Sewer Underground Ext. 303 Roof Sheathing 204 Plumbing Underground Int. 304 Sheer Inspection 205 Plumbing Underground Ext. 305 Insulation 306 Mid -Roof 307 Metal / Lath / Stucco d 206 Water Underground 308 Rough Electrical Residential Do Not Cover Underground or Below / In -Slab Work Prior To Approval Of The I sp Miions I all Rough Inspection Date Inspector Initials C me P %I 301 Rough Framing I 'J r1J 302 Wall Sheathing ft 11 J 303 Roof Sheathing 304 Sheer Inspection 305 Insulation 306 Mid -Roof 307 Metal / Lath / Stucco d 308 Rough Electrical Residential 309 Rough Electrical Commercial 310 Electrical Meter Residential 311 Electrical Meter Commercial 312 Temp. Const. Meter 313 Rough Plumbing Residential 314 Rough Plumbing Commercial 315 Shower Pan SEE OVER FOR ADDITIONAL INSPECTIONS or Rough Inspection (continued) Date Inspector Initials omments 316 Rough Mechanical Residential 317 Rough Mechanical Commercial 318 Boiler / Furnace 319 Hot water tank 320 Drywall screw and Nail 321 Moisture board / shower walls F322 Rough Grading -41 323 Miscellaneous Final Inspections Date Inspector Initials Comments 402 Gas Meter Release 403 Final Electrical Residential 404 Final Electrical Commercial 405 Final Mechanical Residential 406 Final Mechanical Commercial 407 Final Plumbing Residential 408 Final Plumbing Commercial -41 409 Final Roof 410 Final Window/Door 411 Landscape/Park/Planning Inspections from these entities shall be requested one week in advance. For landscaping and parking inspections please call 303-235-2846 For ROW and drainage inspections please call 303-235-2861 For fire inspections please contact the Fire Protection District for your project. 412 Row/Drainage/Public Works 413 Flood plain Inspection 414 Fire Insp. / Fire Protection 415 Public Works Final 416 Storm Water Mgmt. 417 Zoning Final Inspection 418 Building Final Inspection Note: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not constitute authorization of occupancy. For Low Voltage permits please be sure that rough inspections are completed by the Fire District and Electrical low voltage by the Building Division. A City of Wheat Ridge Residential Roofing PERMIT - 201706661 PERMIT NO: 201706661 ISSUED: 08/28/2017 JOB ADDRESS: 4190 Dudley ST EXPIRES: 08/28/2018 JOB DESCRIPTION: Residential Re -roof to remove cedar shakes and install Gerard stone coated metal with 50 sq house pitch 4/12 *** CONTACTS *** OWNER (303)421-9974 O HAYRE LARRY T SUB (303)274-1111 Manuel Rocha 021129 Horn Brothers Roofing *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 28,612.00 FEES Total Valuation 0.00 Use Tax 600.85 C �a Permit Fee Misc. Fee C 25.00 `[ f * * TOTAL * * 17T77-70 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to fi approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Midroof & Final Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. City of Wheat Ridge T Residential Roofing PERMIT - 201706661 PERMIT NO: 201706661 ISSUED: 08/28/2017 JOB ADDRESS: 4190 Dudley ST EXPIRES: 08/28/2018 JOB DESCRIPTION: Residential Re -roof to remove cedar shakes and install Gerard stone coated metal with 50 sq house pitch 4/12 I, by n signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications: applicable building codes, and all applicable municipal codes, policies and procedures, and that f am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that 1 am le ally authorized to include all entities named within this document as partes to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of an manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official DaterM REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS ✓ City of Wheat Ridge Residential Roofing PERMIT - 201706661 PERMIT NO: 201706661 ISSUED: 08/28/2017 JOB ADDRESS: 4190 Dudley ST EXPIRES: 08/28/2018 JOB DESCRIPTION: Residential Re -roof to remove cedar shakes and install Gerard stone coated metal with 50 sq house pitch 4/12 *** CONTACTS *** OWNER (303)421-9974 0 HAYRE LARRY T SUB (303)274-1111 Manuel Rocha 021129 Horn Brothers Roofing *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 28,612.00 FEES Total Valuation 0.00 Use Tax 600.85 Permit Fee 488.05 ** TOTAL ** 1,088.90 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Midroof & Final Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. r� City of Wheat Ridge k Residential Roofing PERMIT - 201706661 PERMIT NO: 201706661 ISSUED: 08/28/2017 JOB ADDRESS: 4190 Dudley ST EXPIRES: 08/28/2018 JOB DESCRIPTION: Residential Re -roof to remove cedar shakes and install Gerard stone coated metal with 50 sq house pitch 4/12 I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the roperty and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attes that I am legally authorized to include all entities named within this document as parties to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in thepermit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable cod ordinanee-ep-mgul w f this jurisdiction. Approval of work is subject to field inspection. J &;R Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Dan Schultz )Ig V�(D From: no-reply@ci.wheatridge.co.us Sent: Thursday, August 24, 2017 11:51 AM To: CommDev Permits Subject: Online Form Submittal: Residential Roofing Permit Application tt Categories: Danny Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? ma How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address 4190 Dudley St Property Owner Name Larry Ohayre Property Owner Phone 303-421-9974 Number (enter WITH dashes, eg 303-123-4567) (� q- c)\ 93 Property Owner Email Address Do you have a signed contract to reroof this property? Applications cannot be submitted without an executed contract attached below. humberto@hornbrothersroofing.com Yes Attach Copy of Executed Larry O.pdf Contract CONTRACTOR INFORMATION Contractor Business Horn Brothers Roofing V/ Name Contractor's License 021129,,/ Number (This is a 5 or 6 digit number for the City of Wheat Ridge) Contractor Phone 7203912444 Number (enter WITH dashes, eg 303-123-4567) Contractor Address 2325 S JASON ST (Primary address of your business) Contractor Email Address humberto@hornbrothersroofing.com Retype Contractor Email humberto@hornbrothersroofing.com Address DESCRIPTION OF WORK 94 TOTAL SQUARES of 50 the entire scope of work: Project Value (contract 28612 value or cost of ALL materials and labor) Are you re -decking the No roof? 94 Does the scope of the project include a flat roof (less than 2:12 pitch)? Does the scope of the project include a pitched roof (2:12 or greater pitch)? Provide any additional detail here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) No _,r' No Remove Cedar Shkes and install Gerard stone Coated Metal pith 4:12 House. SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and 95 that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Name of Applicant Humberto Cruz Email not displaying correctly? View it in your browser. 96 Phone 303-274-1111 In Business Since 1984 NORM BROTHERS ROOFING A COLORODO COMPoRNY 2325 S. Jason Street • Denver, Colorado 80223 Fax 303-462-1176 sq S OWNER n REPRESENTATIVE DATE 7 STREET � I`1( 7����(% }��J'`1y'ce BILLING ADDRESS CITY /�� .. ] /j"Z`IIP rl �.P J MAPSCO '?��_Z 7` t CITY STATE ZIP TEL • TR SPE 1FICATIN REPAIR OR REPLACE WITH Q % TYLE OF SHINGLE �a,�r ❑ COLOR OF SHINGLE EAR OFF LR/YESNO LAYER(S) L3/MANUFACTURERS LIMITED WARRANTY YEAR(S) (COMPANY'S LIMITED WARRANTY V YEAR(S) (VALLEYCOSED❑ OPEN TYPE RIDGE MATERIALCi k1 -[ TYPE ��/h GING ('. R COLOR V (2f/SIZE �// REPLACE PIPE JACKS 211REPLACE LP VENTS INSTALL #30 FELT I&W 3 -CAVES 21VZALLEY ENETRATIONS EXTRA WORK ZCLEAN-UP & HAUL OFF ROOFING TRASH A ZTECT AN OUT GUTTERS & ROOFING TRASH T LANDSCAPE WHERE NEEDED R COVER POOL AND/OR DECK IF NEEDED V PAI T ROOF STACKS COLOR F ROLL MAGNET SPECIAL INSTRUCTIONS C4 Wit,, r {t' •� , '/ L� j 2. f --L' r., -4- V7 L, \ ' 3. SPECIAL ATTENTION AREAS El SOLAR PANELS .................................. ❑ YES NO ❑ GUTTERS (ANY OLD DAMAGE) ..................... t rtS ❑ NO (SKYLIGHTS: HOW MANY L r1� SIZE PITCH: ANY AREAS UNDER 4/12 .................... v YES ,;gW0 FLAT AREAS: Lc 7, 7S SOFFIT Q OPEN OR ❑ BOXED Ci -LEAKS: WHERE ❑ INTERIOR DAMAGE: WHERE Q DOES DRIVEWAY HAVE CRACKS ................... ❑ YES ❑ NO DIAGRAM or NOTES EXISTING TYPE ROOF K A�GEE �/ PITCH ACCESS --�—"� 1=L- NO(ICt pr fai Ii-vkSIE - I � '� TO( �E , - pfd - I- (M Y a. Ir JM I IM)Nn 0 n 1, a H(rs6v IdNi STEEP? ICS 2 -STORY o TERMS /^ WE HEREBY PROPOSE to furnish labor and materials in accordance with the specifications, set out herein, for the sum of $ t �(,,.�• &e When accepted by Company, this becomes becomes a binding contract subject to the specifications and all terms as set out herein. "Contract Price". BILLING AGREEMENT: l(�°f, A I)(VVI (Yin,G'i'in� i-lC)�tao✓1 / t�a�ti�ri�. �ia, , , ,_ _ n, i i _ ACCEPTED BV"��F WITNESS INSURANCE CO. MORTGAGE CO. ' ACCEPTED BY DATE SALESMAN kAn")el yo a'al3r (� a')�r CLAIM NO. ACCOUNT NO. ADDRESS CITY _ STATE ZIP Asaw 04 e ice= k view r www.GerardUSA.com Canyon Shake Counter Batten & Batten �rs INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation of the Gerard Canyon Shake counter batten and batten roofing system. They are not the only ways to install a Gerard system but are acceptable methods for the standard installation of the Gerard product Contractors and installers should at all times use their professional judgment, and modify and tailor details to fit their specific installation and to meet local codes and ordinances. Due to the fact that Gerard has no control over the actual installation of the product, Gerard assumes no liability for incorrect installation of its product or any personal injury that may occur while installing such product. Nor does Gerard express nor imply any warranty related to the installation of the product. Gerard's liability with regards to the Gerard product is limited exclusively to its standard written lifetime limited warranty. Therefore, Gerard recommends that only professional roofing contractors, who have completed the Gerard Factory Training Program, should install the Gerard roofing system. Although a contractor has completed the factory training course, Gerard does not guarantee the success of the installation. W Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A HEADWATERS Product January 2016 I P F10 -03h, I RKAKU�� Canyon Shake Counter Batten & Batten Gerard Canyon Shake Actual Size= 45"x 16.5" Exposure= 42 3/8"x 13 7/8" Weight= 5.83lbs. per panel Panels per square (100 sq. ft.) _ 24.5 pcs Weight per square= 140 lbs. Gerard Shake Cap Actual Size= 15 1/4"x 6" Exposure= 14 1/2"x 6" Weight per cap= 11b. Canyon Shake unul1unmmNuani2111inti 1111illim"111 I The Canyon Shake is designed to emulate the traditional hand -split wood shake. The profile gives a rugged wood shake appearance and adds strength making it a very walkable stone coated steel roof. Viel Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies ( A =HEADWATERS Product January 2016 GERARD" Canyon Shake Counter Batten & Batten Parts and Accessories Stone Coated Valley (6") Used for both open and closed valley details Fascia/Drip Metal (3 %" or 5") Used at the eave and also as a counter flashing where desired Z -bar (3" or 5") Used for surface mount counter flashing and as a reglet/receiver at sidewalls Flat Sheet Used for custom fabrication of flashings 16"x 120" Granule coated on one side Ridge Vent Many styles are compatible with the As provided by Gerard (or similar to Python) installation of the detail 3" Python As provided by Gerard Fasteners %" Stitch Screw 2" Panel Screws (non -washer) 2 3/8" (for panels and battens) and 3 %" Ring Shank Nails (for battens) EZ Vent �r l�i5/3i- inlCa) Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies i A = HEADWATERS Product January 2016 eag I UEHAHU Canyon Shake Counter General Safety Notes: Batten & Batten Tile Cutter This tool is used to cut the panels both in length and width. The legs are removable for ease of handling; the cutter adjusts for left or right handed use. The blade is reversible and able to be sharpened. Shake Brake The brake can perform multiple tasks: 5. Make half panel bends up and down. 6. Bend full panels across the width 7. Bend flat stock and modify existing flashing. 8. Complete taper bends for trimless details. The safety tips provided here are for general awareness of the user. Gerard Roofing Technologies assumes no liability or responsibility for incorrect use of the products or any personal injury that may be caused as a result of use. • Select an open area and establish a safe working perimeter to set up tools. Instruct anyone in the vicinity of the safe working area. • Inspect each tool before each use. Do not use a tool that is not in good working condition. Regularly maintain tools for best performance. • Wear personal protective equipment. • Be aware of "pinch points" and keep hands and clothing away from such. • Use the correct tool for the job. Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A = HEADWATERS Product January 2016 T Canyon Shake Counter Batten & Batten General Information Batten Only Install When installing a batten only project, all details are the same as developed herein, save the use of the counter battens and 1"x4" framing at the hips, rakes, valleys and ridge are omitted. Storage Product must be kept covered, well ventilated and dry until installed. If the stacked tiles become wet, they should be immediately separated and dried. Refer to MCA minimum performance guidelines for more detailed standard practice information relating to site storage of metal roofing. Roof Traffic The Batten tiles by Gerard are installed from the ridge down. When walking on the installed tiles, walk on the front edge of the low sections where the two rows come together and are attached to the battens. Avoid stepping on side laps. Footwear When it is required to walk on the Gerard tiles, rubber soled athletic type shoes or similar soft soled footwear is recommended to avoid damage to the finished product and to provide grip for safety. Roof Pitch The Gerard tile is designed to be installed from a minimum of 4:12 pitch up to a vertical face in all climates and down to 3:12 pitch in warm weather climates. For slopes under 3:12, the tiles act only as a decorative roof covering. In this type of installation please consult our technical department (1-800-237-6637) and the local building officials. Underlayment Underlayment is generally required by most building codes. When allowed by the building code, underlayment is not required in re- roofing over existing composition roofs when the existing roof is in acceptable condition to act as the roofs underlayment. The exception to this condition will be in areas of extreme weather conditions where the underlayment should be of a type required by the local building code and official. Galvalume The Gerard Stone Coated Steel Roof System is produced exclusively from long lasting Galvalume Steel. The Galvalume coating will react unfavorably if in direct contact with lead or copper in a wet environment. Rain water run-off from copper roofs onto a Gerard Roof should be avoided as the run-off can be aggressive in nature and may attack the finishes. Only approved fasteners should be used. Please consult the technical department for recommendations. Pressure Treated Battens The use of copper based pressure treated lumber should NOT be used when installing Gerard roofing products. The use of such will void the lifetime limited warranty offered by Gerard. Any questions call our technical department at 1-800-237-6637. Use of Fasteners in Saltwater Areas All exposed fasteners used for the installation of Gerard Roofing products within one mile of non -freshwater properties must be stainless steel. Severe Weather Conditions If the area to which the Gerard panels are to be installed is prone to severe ice, snow, water or wind, additional measures may be required. Please contact the Gerard technical department for more detailed procedures 1-800-237-6637. Installation Labor A minimum two-man crew is recommended from start to finish. This will provide a cost effective, quality installation. A qualified two-man crew is generally able to install a minimum of one square (100 sq. ft.) per hour under normal circumstances. LM Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A =HEADWATERS Product January 2016 I� UMAKU Canyon Shake Counter Batten & Batten Best Installation Sequence When installing on a counter batten and batten system: 1. Begin with code compliant underlayment (minimum #30 felt) 2. Install 1"x4" framing and counter battens fastened from the bottom up 3. Install panel battens from the bottom up 4. Begin laying panels from the top and work down (Install the first full course of panels below the short course at the ridge first) 5. Lay field panels with the correct offset/stagger to cover major areas of the structure quickly (including sub -panel for pipe flashings) 6. Install the detail panels at hips, rakes, valleys and ridge 7. Install trim and flashing 8. Caulk and seal all flashings 9. Touch-up any areas that may be required 70 Cz a Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A 'Y HEADWATERS Product January 2016 Fascia P f ^3 I eaE. UL Canyon Shake Counter Batten & Batten Roof Preparation *Gerard Canyon Shake can be installed over composition shingle or over solid sheathing (solid sheathing will require code approved underlayment). 1. Re -roof over composition shingles, the procedures are as follows: 1. Cut back existing shingles flush with the perimeter of the roof. 2. Remove existing drip edge. 3. Remove hip and ridge cap. 4. Dry -in with a minimum #30 felt underlayment in proper "shingle" method as per manufacturer. 2. New Construction or full Removal of existing roof, procedures as follows: 1. Remove all existing roofing materials to deck. Ensure deck is to local code. 2. Install new minimum #30 felt underlayment according to local code requirements and manufacturer specifications. 3. Install valley materials including water barrier underlayment. 4. Install ice and water shield at all valleys, rakes and eaves. Trim Lake (Loot to WaA Iley Notes: 1. Make sure deck attachment is to code but at a minimum 8d x 2 3/8" Ring Shank Nails spaced 6" O.C. 2. Minimum underlayment should be ASTM D226 Type II #30 felt fastened according to code. 3. Where fire barrier is required UL listed fire barrier with valid evaluation report is approved when installed according to code and ICC report. 4. Local building codes govern. Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A = HEADWATERS Product January 2016 -0 � aU b4 a, GERARD Canyon Shake Counter Batten & Batten Counter Batten and Batten Install Detail {ieYy: bb epryl i�7' Spi � d I n1�rr rvrd, Wr^0 eM urs M nTesrrC eX rs 1-9 PP?Lr MY��CY.tr 9--V N-9a�)r / NstYlwb rOrm.r+s �isrN RaWV � / T�rNmpw' 9s�n. Sorin' n ww rwwr a Isr4 r r.v lbrjrl Yti! � yp mn 1'qw Nra� �� erlww b W W d 1an1 taeosbbp � CMrnM IRMr: b M Mrrr.Y 1's4' 1pLcpry N ff tl 4e'Y blbrra b w.rtvrs...q N'OC mu l erevr rve4er. 1pennY rHY» DM n- poen +oouob vopx s.s.sosn wr> � bul eo�ryp t'r+�W moss. tls Wdh1 sYSC i' b wM �y / rnYYW. S—fwenrq: T. 1.1w��— "TY111W Mr IM 1' o.ef frNsn GnPer1 Mess: 1}741's 4nM Vw4 W Counter Battens: Nominal 1"x4" SPF 42 or better fastened to truss structure @ 24' o.c. max. Fastener number, spacing and size per curreports a app cat go product uad- nation reports and focal governing buBd- i1g codes. I Counter Battens and Battens: 1. Lay 1"x4" counter battens over roof trussing (Maximum 24" O.C.) bottom of counter batten is to be in line with eave fascia 2. Fasten counter batten with fastener of sufficient length to penetrate truss by min. 1" twelve inches on center 3. Install first row of battens even with eave and counter batten 4. Fasten battens with fastener of sufficient length to penetrate counter batten by min. 1" 5. If no counter battens are used, battens must be fastened into the roof trussing with penetration of fastener a 1" min 6. Install second row of battens at 13-3/8" (this measurement may change depending upon the eave line. 7. If eave line is irregular, second row of battens can be adjusted to allow an average of W overhang of bottom panel 8. All successive battens spaced at 13-7/8" as spaced by the Gerard Batten Spacers 9. Batten ends must end over a counter batten a.1 Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A =HEADWATERS Product January 2016 . Pro!:Maq, e 9. IGEAR Canyon Shake Counter Batten & Batten Eave Detail Battens: to be nominal 21K2" spruce pine fir #2 or better fastened to counter battens. Fastener number, spacrng and size as per Fastener chart. Install using appropriate Gerard Roofing Technologes' "Batten Spacers'. Spacing between first two battens will vary to insure panel layout t.._ Gerard Fascia Metal: tight to structure_ At the rake edge: Panels: Install bottom panel to extend past fastxa +• J". Seat and chip screws at top surface of panel. Roofing tlnderlayment Wrap min. 1' over finish edges. Counter Battens: to be nominal 1'x4" spruce pine rrr #2 or better fastened to truss structure. 24" C -C. Max. Fastener number, spacing and size as per fastener chart. Rake Trim Detail *shake Rake Trim: Fasten at sides into 1 "x3", Panels: Cut and bend panel 2"x2" or 2"x4" batten depending on need. (For use with Canyon Shake only) and turn up 1" at rake batten. Roofing Underlayfw3nt Wrap min 1" o\'ctr j rrish edges 1. Inside edge of rake batten should measure 3" from the rake fascia 2. Fasten rake batten into battens with nails or screws 3. Cut Canyon Shake panel to the correct length. DO NOT CUT PANEL WITH SAW OR GRINDER 4. Fold Canyon Shake up at the rake batten minimum 1 %" 5. Install Shake Cap tight to the Canyon Shake turn up (for a tighter fit the Shake Cap may be formed at the "hugger" bend to square the cap) 6. Fasten caps with two fasteners in the rake and one into the rake batten on the top of the cap. Fasten panels as required a. Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A =HEADWATERS Product January 2016 I UEKAKU Canyon Shake Counter Batten & Batten Stone Coated Valley Trim Detail B*ftns: to ft npnf110121fY wrote Arne �f Q7 D' Deter'AM1m x cal rfer "Leri. P'MY^RI ftnite/. &r*VV ord sae is per 4-swer Chet'. IRS134 org 0r,"WWt Qet*e0 ROOM 11ih"02ei 'B"V- 9MC-1- f uttp t s e tettey Kftn 2'Yi''Oaftens. 8*thin aDDatnp ---. NS Tie 14i eantrn slake •: _ ose*fc Vfa►r: rmtrntath "-er, D.t9 14' skies as 2r 0 mr. Emma ±' 4n teT,rd ICBG* At the valley intersection: ecur4w B*Crnc x be !'arrel t'YJ' solute v"t "*2 e' pfnrt test@Rea % mZu+n ler rg. 2a' CC Met. f &Wfw n.0-ftf, SC40M *1#f Vn Is ret "Wene' t -an �- Psnr:i: C3 tt*li t"I pvet x *r:? r, Dh1 tr acorn nb .e.at.� !Ia flrkauna"I'Menl: •.twetrett 2 cha nta csnMuss xasn ZY 1. Frame valley with two (2) 1"x4" counter battens 2. Place 2"x 2" nominal battens spaced 6" O.C. centered in valley trough 3. Install 6" stone coated valley fastened 24" O.C. on both sides 4. Measure, cut and form panels to fit valley angle DO NOT CUT PANEL WITH SAW OR GRINDER 5. Turn 1 t/<" of panel into the valley pan 6. Fasten panels as required (DO NOT fasten in valley trough) NOTE: valley can be formed with a closed detail 7. The same technique is used but with the panel turn downs meeting in the center of the valley pan NOTE: other valley material is available (see full install manual for details) Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A =HEADWATERS Product January 2016 MMM Canyon Shake Counter Batten & Batten Hip Trim Detail At the hip intersection: : Fasten at sides. anyon Shake only) 3anels: Cut and bend panel on angle and tum up l } at hip battens. 1. Position a nominal 2"x2" batten centered on the sheeting joint 2. Fasten batten into every panel batten 3. Place second batten directly on top of previous batten and fasten 12" O.C. 4. Cut Canyon Shake panel to match hip angle. DO NOT CUT PANEL WITH saw OR GRINDER 5. Bend Canyon Shake panel up against stacked battens (minimum 1 %") 6. Shape and install Shake Trim with two panel screws, one on each side, into the 2"x2" 7. Fasten panels as required 8. Optional: the hip battens may be set 5" apart to have panels finish to the battens Panels: Cut and bend panel on angle and tum up 11" at hip battens_ Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A = HEADWATERS Product January 2016 Canyon Shake Counter Batten & Batten Wall Trim Details Battens: Nominal 2"x2" SPF 42 or better 'a;tened to counter battens or structural taming Gerard "Z" Bar: Fasten to structure with appropriate fasteners 12" o.c. max Seal top with approved sealant. Panels: Cut and bend panel ,, - to length and tum up at sidewail. Roofing Underlayment: Turn up min. of 3" at sidewail. Counter Battens: Nominal 1"x4" SPF #2 or better fastened to structural framing @ 24" o.c. max. At the wall intersection: 1. Measure, cut and form Canyon Shake panel to the correct length. Panel turn -up minimum 1 %" DO NOT CUT PANEL WITH SAW OR GRINDER 2. Fasten panels as required 3. Flash panel turn up with Z -bar 4. Fasten Z -bar with appropriate fasteners maximum 16" O.C. 5. Caulk Z -bar with gun grade polyurethane sealant Head! Vertical Wall Battens: Nominal 2"x 2' SPF #2 or better fastened to counter battens or framing st- ructure under. Fastener number. spacing and size per current applicable product evaluaiton reports and local governing building codes. go Gerard "Z" Bar:Fasten with appro- priate fastener 12" O.C. max. Seal top with approved sealant. Roofing Underlayment: Turn up 3' min at headwall. Panels: Bend and cut "Short Course' as needed to fit panel and batten fay out. Use 1"x 4" SPF #2 or better to st pport cut panel. Counter Battens: to be nominal 1"x 4" SPF #2 or better fastened to structural framing @ 24" o.c. max. Fastener number, spacing and size per current applicable product evaluaiton reports and focal governing building codes. Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A Z HEADWATERS Product January 2016 k Canyon Shake Counter Batten & Batten Flashing Detail - Backside Chimney, Skylight etc, Battens: Nominal 2"x2' SPF 42 or better fastened to counter battens or structural framing. --1 Panels: Bend and cut bottom edge to fit. Top saddle to be tent short to create diverter. Fasten and seat with approved sealant. Note This must be done as to not leave a joint behind wall (<36). Custom pan must be used if solid mill not suffice. Behind Chimney, Skylight, etc.: Counter Battens: Nominal 1"x4 SPF #2 or better fastened to structural framing @ 24" o.c. max. -, Roofing Underlayment: Turn up wall min. 6" 1. Measure, cut and form Canyon Shake panel to the correct length. DO NOT CUT PANEL WITH SAW OR GRINDER 2. Fasten panels as required 3. Flash panel turn up with Z -bar 4. Fasten Z -bar with appropriate fasteners 5. Caulk Z -bar with gun grade polyurethane sealant 6. An overlay of a diverter maybe installed to move water farther from corner detail NOTE: Make certain that NO panel side lap joints are installed behind the curb or wal I Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A _-!,:', HEADWATERS Product January 2016 Canyon Shake Counter Batten & Batten Non -Vented Ridge Detail Shake Ridge Trim: Fasten at sides. Seal and chip exposed screw, jFor use with Canyon Shake only) At the ridge: 1. Stack two (2) nominal 2"x2" on the ridge and fasten to the structure 2. Cut and bend Canyon Shake panel to size needed. DO NOT CUT PANEL WITH SAW OR GRINDER 3. Install Shake Cap, fastening into the 2"x2" on each side 4. Fasten panels as required Vented Ridge Detail o:.,..,. Frim. a. ..r- Canyon Shake only] At the ridge: 1. Make certain that appropriate opening is provided in roof decking (equal to soffit venting) 2. Stack three (3) nominal 2"x2" on the ridge and fasten to the structure. Number of battens varies with roof pitch 3. Install vent material to stacked 2"x2"'s 4. Cut and bend Canyon Shake panel to size needed. DO NOT CUT PANEL WITH SAW OR GRINDER 5. Install Wind Soffit to bent panel 6. Install Shake Cap, fastening toward the bend of the cap, into the 2"x2" on each side (2) L.f) maintaining air space r --q CU 7. Fasten panels as required a Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A = HEADWATERS Product January 2016 Canyon Shake Counter Batten & Batten Roof Traffic Locations For roof areas that will receive frequent traffic (around roof -top mechanical units, TV antennas, chimney areas, etc.) install a 1"x 4" batten four to five feet in length between each regular batten row up to and around where the foot traffic pattern will be. Fasten the traffic batten into the decking to maintain its position. This technique can be used in areas that may have addition impact from snow loads or snow fall from higher roof elevations to prevent excessive denting of the panel. Traffic Batten Standard Panel Fastener Locations High Wind Panel Fastener Locations Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A =HEADWATERS Product January 2016 V Cz a Shake Counter Batten & Batten Double Pan (Sandwich) Pipe Penetrations 1. If dry -in state is required, a sub -pipe jack may be installed with dry -in material 2. Install minimum #30 felt under batten system 3. Install one Canyon Shake panel with a hole of sufficient size to fit easily around pipe 4. Size and form granule coated steel pipe boot and seal it to under -panel 5. Cut the second panel tightly to the boot 6. Set the panel over the boot 7. Caulk and chip the hole and the top of boot NOTE: other flashing methods are available. Contact technical support or review full Installation Manual a Canyon Shake Counter Batten and Batten Installation Gerard Roofing Technologies I A =HEADWATERS Product January 2016 �. CITY OF WHEAT RIDGE _1�9�Building Inspection Division (303) 234-5933 Inspection line '(303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: t2ofz; Job Address: Permit Number: Ooh a4 - P_ - P_ o one available for inspect io Time 1II) AZ/ M Re -Inspection required: Yes No *When corrections have been made, call for re -•h' pection 30 234- 3 Date: 1 v 12. 1 _�- Inspector: DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: -3 O Job Address: Y06 0 y l& 1/ S/' Permit Number: '9017lJ 661 ❑ No one available for inspectionjime2akJ AM/PM Re -Inspection required: Yes (Do' When corrections have been made, cae-inspection at 303-234-5933 Date: 9 l 7 Inspector: A7 DO NOT REMOVE THIS NOTICE DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number: BUILDING INSPECTION LINE - 303-234-5933 CITY OF WHEAT RIDGE Date: 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 - (303-235-2855) 12572 8/6/01 Property Owner: Property Address: 4190 DUDLEY ST Contractor License No.: 18068 Company: Metropolis Heating OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Phone: 421-9974 Phone: 233 1307 Construction Value: Permit Fee: Plan Review Fee: Use Tax: I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application, and that I assume full responsibility for compliance with the Wheat Ridge Building Code (U.B.C.) and all other applicable Wheat Ri ordi ces, r work under this permit. (OWNEIR)(CONTRACTOR) SIGNED Use: lli ~&iilJ DATE ~-<O -of Total: Description: GAS FIREPLACE INSERT AND GAS LINE $2,486.00 $83.25 $0.00 $37.29 $120.54 -- Approval: Zoning: ........ Approval: -.-1.- Approval: Occupancy: SIC: BUILDING DEPARTMENT USE ONLY Sq. Ft.: Roof: Stories: Residential Units: Walls: Electrical License No : Company: Plumbing License No : Company: Mechanical License No : Company: Expiration Date: Approval: Expiration Date: Approval: Expiration Date: Approval: (1) This pennit was issued in accordance with the provisions set forth in yopur application and is subject 10 the laws of the State of Colorado and to the Zoning Regulations and Building Code of Wheat Ridge, Colorado or any other applicable ordinances of , the City. (2) This permit shall expire if (A) the work authOrized is not commenced within sixty (60) days from Issue date or (B) the building authorized is suspended or abandoned for a period of 120 days. (3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year, If changes are made or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit. (4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem. (5) Contractor shall notify the Building Insfector twenty-four (24) hours in advance for all inspectIons and shall receive written approval on inspection card before proceed"" g with successive phases 0 the/'ob. (6) The ce of a permit or the approval 0 draWings and specifications shall not be construed to be a permit for, nor an approval of, any VIolation of the provIsions f. b d~ any other ordmance, law, rule or regulation , //IA4'--. Chief Buildi~nspector ' DEP~\RT:vrE'IT OF PL\:"!:"!!"!\' .\'iD DEVF.LOPvlE'IT BUILDL'lG L'lSPECTION LL'lE - 3113-234-5933 CITY OF WHEAT RIDGE 751111 WEST 29TH A VE:'iuE WHEAT RIDGE, CO 8112]5 - (3113-235-2855) APPLICA T/ON f31J1lriin~ .[J,~...",iT '<''!'If-,,~.. Date o 11 /1ylZ..E:.. ~/9o bv t)LeY li'o6g' //? f 7'1UJ JOI1L I , ST Phone: '/;(1- 997~ Property Owner: Property Address: Contractor License ~o.. Company' Phone: -::l33-130? OWNERlCO;....TR.-\CTOR SIGN,..I.TFRE OF U:"-TIERST.-L'mL'iG '-\'.'m "\GREE;-"IE~I Construction Value: Pennit Fee Plan Revie\v Fee" T;.;:p T::pc ;I, 'fU'. vv r n",arb~ ;;enit\' that the setback dist.J.nces proposed by this permit application Me accurate, and UO not violate appJicabk ordinances. rules or regulations of the City {)f \Vhe:J.t Ridge or c:ovenanLs. easemer;L~ or restrictions of record: that all measur<C'ments shown. J.nJ :ll1e!;~l.tjor1.'i made Me ,to.:;:;uratc::: thJ.1 I have ,<::td and :tgree (0 abide b:"aII ..::onditions printed on :;us ;Lpplic.1lions and that [ J..Ssume tiJiJ r,:sponsibility tor ;;ompliance with the Wheat Ridge Building Code (L.B.C) and a.ll other applicable Whea.t Ridge Ordinanc ,for work under this permit. Total: (C\N:\"E~Y':D0.7R.~.C,";,"CR> SrG~";ED Dxr" 8-6-01 DeSCrIption: 6lfs ~E:PLJ4c.e INS,S::K--r Avo &415 (j /VI: BUILDL'IG DEPARTMENT USE ONLY ZB~wgi.':G8@n~~_~: Approval: Zoning: SIC Sq.Ft. ...-.-.......--.....-..........-... Building Comments: Approval: Public WOrks. Colll1l1ents: Approval: Occupancy: Walls: Roof: Stories: Residential Units: Electrical License No: Ccmpany: Plumbing License No: Company: Mechanical License No: Company: Expiration Date: Aj:proval: Expiration Date: Approval: Expiration Date: Approval: (1) Th1S permit I),'a,s issued In accordance With the provisions set forth in your applicatIon and is subject to the laws or the St.l!:: ot" Color~do :!J1d to the ZOnln~ Re~.llations and Building Code ol\.Vheat RIdge, Colorado or any other applicable ordinances Olthe CIty (1', This permIt shall expire 1f(.'\) the work authorized IS not commenced wilhin si:<ty (60) days trom issue date or (8) the bUilding .1uthorized IS su.spended or abandonc:d:"ora period of [:0 days. (3; If this permit expires. a new permit may be acquired lor .11"<:e of One-haJf the ,1mount normally required, ?rovided no chanbes h,we been or will be made in the on~al plans md specilications md my suspension or Jbandonrnent has net ~xc~eded one (1) year. If changes have been or if Suspension or ,1bandonrnent exceeds one (I)yenr, iulIf<:es shall be paid lor a newperrrnt. (4) No work 01 ,mY mannersh.~jl be done that will change t."e naturall10w ofwater causing a drainage problem. (5) C'>r1trac:cr shall notIfy the Budding Inspector twcmY-(our (:24) hours in advar.ce lor all inspections and ~hall r::c::lve '.lITitten .1pproval on inspectIOn C.1fd before proc<:edlng with succeSSlV" pnasesolt,""Job (6) The issuance 01 a permit or the apprOVal of draWings and specilicatlons shall not oe construed to be J permlt for. nor ,1n approval of. .myviol.ltlon o(the ProVtSlOns of the bUIlding codes or any other ordinance. law. rule or regulation. Chief Bll1lding Inspector