HomeMy WebLinkAbout4190 Dudley Streetapplicable City of
Wheat Ridge codes
and ordinances for
work under any permit
issued based on this
application.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have Yes
been authorized by the
legal owner of the
property to submit this
application and to
perform the work
described above.
I attest that everything Yes
stated in this
application is true and
correct and that
falsifying information in
this application is an
act of fraud and may
be punishable by fine,
imprisonment, or both.
Person Applying for Lisa Wilkie
Permit
Email not displaying correctly? View it in your browser.
From: no-reolv(alci.wheatridae.m. us
To: CommDev Perm is
Subject: Online Form Submittal: Residential Egress Window Pennit Application
Date: Monday, October 25, 2021 11:34:05 AM
Residential Egress Window Permit Application
This application is exclusively for RESIDENTIAL EGRESS WINDOWS ONLY.
YOU MUST ATTACH A VALID CREDIT CARD AUTHORIZATION FORMAN D
ENGINEER LETTER STAMPED DETAIL SHOWING THE U -VALUE OF THE
WINDOWCUT IN ORDER FOR THE PERMIT TO BE PROCESSED. Your Permit
will be emailed to the email address provided below once it is processed.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
WORK UNTIL PERMIT HAS BEEN ISSUED.
Is this application for Yes
existing EGRESS
window(s) needing
vertical cuts only?
PROPERTY INFORMATION
Property Address 4190 Dudley St, Wheat Ridge, CO 80033
Property Owner Name Larry O'Hayre
Property Owner Phone
Number (enter WITH
dashes, eg 303-123-
4567)
Property Owner Email
Address - Do not enter
a contractor email
address
Attach City of Wheat
Ridge Electronic
Payment Form - "DO
NOT ATTACH A
PICTURE OF A
CREDIT CARD"
191819m, PA I016YE!
Field not completed.
WR EPF- 10-25-21.Ddf
CONTRACTOR INFORMATION
Contractor Business Brighter Basements Inc.
Name
Contractor's License
120254
Number (This is a 5 or
6 digit number for the
City of Wheat Ridge)
Contractor Phone
303-777-7130
Number (enter WITH
dashes, eg 303-123-
4567)
Contractor Email
permits@brighterbasements.com
Address
Retype Contractor
permits@brighterbasements.com
Email Address
01 :K161 Ci 191 [*] 0 N] avOLe] N :/
Number of EGRESS 1
windows being
replaced
Location of EGRESS Bedroom
window(s) being
replaced (for example,
master bedroom,
kitchen, bathroom, etc):
What is the u -value of .28
the EGRESS
window(s)? City of
Wheat Ridge requires
the u -value to be .30 or
better on windows.
Attach copy of 4190 Dudley St WR 80033 ndf
Engineer stamped
letter showing vertical
cuts detail and u -value
Project Value (contract 3850.00
value or cost of ALL
materials and labor)
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
JIJ A0
PERMIT:W�j� ADDRESS: qmoDuAltols JOB CODE:
INSPECTION RECORD
Inspection online form: http://www.ci.wheatridge.co.us/inspection
Cancellations must be submitted via the online form before 8 a.m. the day of the inspection
Inspections will not be performed unless this card is posted on the project site
Request an inspection before MIDNIGHT (11:59 PM) to receive an inspection the following business
Foundation Inspections
Date
Inspector
Initials
Comments
102 Caissons / Piers
I 'J r1J
103 Footing / P.E. Letter
203 Sewer Underground Ext.
104 Foundation Setback Cert.
204 Plumbing Underground Int.
105 Stem Walls
205 Plumbing Underground Ext.
106 Foundation wall Insulation
d
206 Water Underground
Do Not Pour Concrete Prior To Approval Of The Above Inspections
Underground / Slab Inspections
Date
Inspector
Initials
Comments
x %,"t
201 Electrical/ Cable/ Conduit
I 'J r1J
202 Sewer Underground Int.
203 Sewer Underground Ext.
303 Roof Sheathing
204 Plumbing Underground Int.
304 Sheer Inspection
205 Plumbing Underground Ext.
305 Insulation
306 Mid -Roof
307 Metal / Lath / Stucco
d
206 Water Underground
308 Rough Electrical Residential
Do Not Cover Underground or Below / In -Slab Work Prior To Approval Of The I sp Miions I all
Rough Inspection
Date
Inspector
Initials
C me
P %I
301 Rough Framing
I 'J r1J
302 Wall Sheathing
ft 11
J
303 Roof Sheathing
304 Sheer Inspection
305 Insulation
306 Mid -Roof
307 Metal / Lath / Stucco
d
308 Rough Electrical Residential
309 Rough Electrical Commercial
310 Electrical Meter Residential
311 Electrical Meter Commercial
312 Temp. Const. Meter
313 Rough Plumbing Residential
314 Rough Plumbing Commercial
315 Shower Pan
SEE OVER FOR ADDITIONAL INSPECTIONS
or
Rough Inspection (continued)
Date
Inspector
Initials
omments
316 Rough Mechanical Residential
317 Rough Mechanical Commercial
318 Boiler / Furnace
319 Hot water tank
320 Drywall screw and Nail
321 Moisture board / shower walls
F322 Rough Grading
-41
323 Miscellaneous
Final Inspections
Date
Inspector
Initials
Comments
402 Gas Meter Release
403 Final Electrical Residential
404 Final Electrical Commercial
405 Final Mechanical Residential
406 Final Mechanical Commercial
407 Final Plumbing Residential
408 Final Plumbing Commercial
-41
409 Final Roof
410 Final Window/Door
411 Landscape/Park/Planning
Inspections from these entities shall be requested
one week in advance.
For landscaping and parking inspections please
call 303-235-2846
For ROW and drainage inspections please call
303-235-2861
For fire inspections please contact the Fire
Protection District for your project.
412 Row/Drainage/Public Works
413 Flood plain Inspection
414 Fire Insp. / Fire Protection
415 Public Works Final
416 Storm Water Mgmt.
417 Zoning Final Inspection
418 Building Final Inspection
Note: All items must be completed and approved by Planning, Public Works, Fire and Building
before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not
constitute authorization of occupancy.
For Low Voltage permits please be sure that rough inspections are completed by the Fire District and
Electrical low voltage by the Building Division.
A City of Wheat Ridge
Residential Roofing PERMIT - 201706661
PERMIT NO: 201706661 ISSUED: 08/28/2017
JOB ADDRESS: 4190 Dudley ST EXPIRES: 08/28/2018
JOB DESCRIPTION: Residential Re -roof to remove cedar shakes and install Gerard stone coated
metal with 50 sq
house pitch 4/12
*** CONTACTS ***
OWNER (303)421-9974 O HAYRE LARRY T
SUB (303)274-1111 Manuel Rocha 021129 Horn Brothers Roofing
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 28,612.00
FEES
Total Valuation 0.00
Use Tax 600.85 C �a
Permit Fee
Misc. Fee C 25.00 `[ f
* * TOTAL * * 17T77-70
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to fi
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name)
roof covering" is required to be on site at the time of final inspection.
Midroof & Final Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be
required, the 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped
off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the
Homeowner.
City of Wheat Ridge
T Residential Roofing PERMIT - 201706661
PERMIT NO: 201706661 ISSUED: 08/28/2017
JOB ADDRESS: 4190 Dudley ST EXPIRES: 08/28/2018
JOB DESCRIPTION: Residential Re -roof to remove cedar shakes and install Gerard stone coated
metal with 50 sq
house pitch 4/12
I, by n signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications:
applicable building codes, and all applicable municipal codes, policies and procedures, and that f am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this permit. I further attest that 1 am le ally authorized to include all entities named within this document as partes to the work to be
performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signature of OWNER or CONTRACTOR (Circle one) Date
1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of an manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official DaterM
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS
✓ City of Wheat Ridge
Residential Roofing PERMIT - 201706661
PERMIT NO: 201706661 ISSUED: 08/28/2017
JOB ADDRESS: 4190 Dudley ST EXPIRES: 08/28/2018
JOB DESCRIPTION: Residential Re -roof to remove cedar shakes and install Gerard stone coated
metal with 50 sq
house pitch 4/12
*** CONTACTS ***
OWNER (303)421-9974 0 HAYRE LARRY T
SUB (303)274-1111 Manuel Rocha 021129 Horn Brothers Roofing
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 28,612.00
FEES
Total Valuation 0.00
Use Tax 600.85
Permit Fee 488.05
** TOTAL ** 1,088.90
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name)
roof covering" is required to be on site at the time of final inspection.
Midroof & Final Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be
required, the 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped
off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the
Homeowner.
r� City of Wheat Ridge
k
Residential Roofing PERMIT -
201706661
PERMIT NO:
201706661
ISSUED:
08/28/2017
JOB ADDRESS:
4190 Dudley ST
EXPIRES:
08/28/2018
JOB DESCRIPTION:
Residential Re -roof to remove cedar shakes and
install Gerard stone coated
metal with 50 sq
house pitch 4/12
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the roperty and am authorized to obtain this permit and perform the work described and approved in conjunction with
this permit. I further attes that I am legally authorized to include all entities named within this document as parties to the work to be
performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signature of OWNER or CONTRACTOR (Circle one) Date
1. This permit was issued based on the information provided in thepermit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the originalpermit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applicable cod ordinanee-ep-mgul w f this jurisdiction. Approval of work is subject to field inspection.
J &;R
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Dan Schultz )Ig
V�(D
From: no-reply@ci.wheatridge.co.us
Sent: Thursday, August 24, 2017 11:51 AM
To: CommDev Permits
Subject: Online Form Submittal: Residential Roofing Permit Application tt
Categories: Danny
Residential Roofing Permit Application
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
your contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a Yes
residential roof? ma
How many dwelling units Single Family Home
are on the property?
PROPERTY INFORMATION
Property Address 4190 Dudley St
Property Owner Name Larry Ohayre
Property Owner Phone 303-421-9974
Number (enter WITH
dashes, eg 303-123-4567) (� q- c)\
93
Property Owner Email
Address
Do you have a signed
contract to reroof this
property?
Applications cannot be
submitted without an
executed contract
attached below.
humberto@hornbrothersroofing.com
Yes
Attach Copy of Executed Larry O.pdf
Contract
CONTRACTOR INFORMATION
Contractor Business Horn Brothers Roofing V/
Name
Contractor's License 021129,,/
Number (This is a 5 or 6
digit number for the City
of Wheat Ridge)
Contractor Phone 7203912444
Number (enter WITH
dashes, eg 303-123-4567)
Contractor Address 2325 S JASON ST
(Primary address of your
business)
Contractor Email Address humberto@hornbrothersroofing.com
Retype Contractor Email humberto@hornbrothersroofing.com
Address
DESCRIPTION OF WORK
94
TOTAL SQUARES of
50
the entire scope of work:
Project Value (contract
28612
value or cost of ALL
materials and labor)
Are you re -decking the
No
roof?
94
Does the scope of the
project include a flat roof
(less than 2:12 pitch)?
Does the scope of the
project include a pitched
roof (2:12 or greater
pitch)?
Provide any additional
detail here on the
description of work. (Is
this for a house or
garage? What is the roof
pitch? Etc)
No _,r'
No
Remove Cedar Shkes and install Gerard stone Coated Metal
pith 4:12 House.
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this Yes
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
I attest that everything Yes
stated in this application
is true and correct and
95
that falsifying
information in this
application is an act of
fraud and may be
punishable by fine,
imprisonment, or both.
Name of Applicant Humberto Cruz
Email not displaying correctly? View it in your browser.
96
Phone 303-274-1111
In Business Since 1984
NORM BROTHERS ROOFING
A COLORODO COMPoRNY
2325 S. Jason Street • Denver, Colorado 80223
Fax 303-462-1176
sq S
OWNER n REPRESENTATIVE DATE 7
STREET � I`1( 7����(% }��J'`1y'ce BILLING ADDRESS
CITY /�� .. ] /j"Z`IIP rl �.P J MAPSCO
'?��_Z 7` t CITY STATE ZIP
TEL • TR
SPE 1FICATIN
REPAIR OR REPLACE WITH Q %
TYLE OF SHINGLE �a,�r
❑ COLOR OF SHINGLE
EAR OFF LR/YESNO LAYER(S)
L3/MANUFACTURERS LIMITED WARRANTY
YEAR(S)
(COMPANY'S LIMITED WARRANTY V YEAR(S)
(VALLEYCOSED❑ OPEN TYPE
RIDGE MATERIALCi k1 -[ TYPE ��/h
GING ('. R COLOR V
(2f/SIZE �//
REPLACE PIPE JACKS 211REPLACE LP VENTS
INSTALL #30 FELT
I&W 3 -CAVES 21VZALLEY ENETRATIONS
EXTRA WORK
ZCLEAN-UP & HAUL OFF ROOFING TRASH A
ZTECT
AN OUT GUTTERS & ROOFING TRASH T
LANDSCAPE WHERE NEEDED R
COVER POOL AND/OR DECK IF NEEDED V
PAI T ROOF STACKS COLOR F
ROLL MAGNET
SPECIAL INSTRUCTIONS C4
Wit,, r {t' •� , '/ L� j
2. f --L' r., -4- V7 L, \ '
3.
SPECIAL ATTENTION AREAS
El SOLAR PANELS .................................. ❑ YES NO
❑ GUTTERS (ANY OLD DAMAGE) ..................... t rtS ❑ NO
(SKYLIGHTS: HOW MANY L r1� SIZE
PITCH: ANY AREAS UNDER 4/12 .................... v YES ,;gW0
FLAT AREAS: Lc 7, 7S SOFFIT Q OPEN OR ❑ BOXED
Ci -LEAKS: WHERE
❑ INTERIOR DAMAGE: WHERE
Q DOES DRIVEWAY HAVE CRACKS ................... ❑ YES ❑ NO
DIAGRAM or NOTES
EXISTING TYPE ROOF K A�GEE �/
PITCH ACCESS --�—"� 1=L-
NO(ICt pr fai Ii-vkSIE
- I � '�
TO(
�E , - pfd
- I- (M Y a.
Ir JM I IM)Nn 0 n 1, a H(rs6v IdNi
STEEP? ICS 2 -STORY o
TERMS /^
WE HEREBY PROPOSE to furnish labor and materials in accordance with the specifications, set out herein, for the sum of $ t �(,,.�• &e
When accepted by Company, this becomes
becomes a binding contract subject to the specifications and all terms as set out herein. "Contract Price".
BILLING AGREEMENT: l(�°f, A I)(VVI (Yin,G'i'in� i-lC)�tao✓1 / t�a�ti�ri�. �ia, , , ,_ _ n, i i _
ACCEPTED BV"��F
WITNESS
INSURANCE CO.
MORTGAGE CO.
' ACCEPTED BY
DATE
SALESMAN kAn")el yo a'al3r (� a')�r
CLAIM NO.
ACCOUNT NO.
ADDRESS
CITY _ STATE
ZIP
Asaw
04
e ice=
k view
r
www.GerardUSA.com
Canyon Shake Counter Batten & Batten
�rs
INSTALLATION NOTIFICATION
The installation procedures demonstrated in this manual are recommended methods for the installation of
the Gerard Canyon Shake counter batten and batten roofing system. They are not the only ways to install a
Gerard system but are acceptable methods for the standard installation of the Gerard product Contractors
and installers should at all times use their professional judgment, and modify and tailor details to fit their
specific installation and to meet local codes and ordinances. Due to the fact that Gerard has no control
over the actual installation of the product, Gerard assumes no liability for incorrect installation of its
product or any personal injury that may occur while installing such product. Nor does Gerard express nor
imply any warranty related to the installation of the product. Gerard's liability with regards to the Gerard
product is limited exclusively to its standard written lifetime limited warranty. Therefore, Gerard
recommends that only professional roofing contractors, who have completed the Gerard Factory Training
Program, should install the Gerard roofing system. Although a contractor has completed the factory
training course, Gerard does not guarantee the success of the installation.
W
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A HEADWATERS Product January 2016
I P F10 -03h,
I
RKAKU��
Canyon Shake Counter Batten & Batten
Gerard Canyon Shake
Actual Size=
45"x 16.5"
Exposure=
42 3/8"x 13 7/8"
Weight=
5.83lbs. per panel
Panels per square (100 sq. ft.) _
24.5 pcs
Weight per square=
140 lbs.
Gerard Shake Cap
Actual Size=
15 1/4"x 6"
Exposure=
14 1/2"x 6"
Weight per cap=
11b.
Canyon Shake
unul1unmmNuani2111inti
1111illim"111 I
The Canyon Shake is designed to emulate the traditional hand -split wood shake. The profile
gives a rugged wood shake appearance and adds strength making it a very walkable stone
coated steel roof.
Viel
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies ( A =HEADWATERS Product January 2016
GERARD"
Canyon Shake Counter Batten & Batten
Parts and Accessories
Stone Coated Valley (6")
Used for both open and closed valley details
Fascia/Drip Metal (3 %" or 5")
Used at the eave and also as a counter flashing
where desired
Z -bar (3" or 5")
Used for surface mount counter flashing and
as a reglet/receiver at sidewalls
Flat Sheet
Used for custom fabrication of flashings
16"x 120"
Granule coated on one side
Ridge Vent
Many styles are compatible with the
As provided by Gerard (or similar to Python)
installation of the detail
3" Python
As provided by Gerard
Fasteners
%" Stitch Screw
2" Panel Screws (non -washer)
2 3/8" (for panels and battens) and 3 %" Ring
Shank Nails (for battens)
EZ Vent
�r
l�i5/3i- inlCa)
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies i A = HEADWATERS Product January 2016
eag
I UEHAHU
Canyon Shake Counter
General Safety Notes:
Batten & Batten
Tile Cutter
This tool is used to cut the panels
both in length and width. The legs
are removable for ease of handling;
the cutter adjusts for left or right
handed use. The blade is reversible
and able to be sharpened.
Shake Brake
The brake can perform multiple
tasks:
5. Make half panel bends up
and down.
6. Bend full panels across the
width
7. Bend flat stock and modify
existing flashing.
8. Complete taper bends for
trimless details.
The safety tips provided here are for general awareness of the user. Gerard Roofing Technologies
assumes no liability or responsibility for incorrect use of the products or any personal injury that may be
caused as a result of use.
• Select an open area and establish a safe working perimeter to set up tools. Instruct
anyone in the vicinity of the safe working area.
• Inspect each tool before each use. Do not use a tool that is not in good working
condition. Regularly maintain tools for best performance.
• Wear personal protective equipment.
• Be aware of "pinch points" and keep hands and clothing away from such.
• Use the correct tool for the job.
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A = HEADWATERS Product January 2016
T
Canyon Shake Counter Batten & Batten
General Information
Batten Only Install
When installing a batten only project, all details are the same as
developed herein, save the use of the counter battens and 1"x4"
framing at the hips, rakes, valleys and ridge are omitted.
Storage
Product must be kept covered, well ventilated and dry until
installed. If the stacked tiles become wet, they should be
immediately separated and dried. Refer to MCA minimum
performance guidelines for more detailed standard practice
information relating to site storage of metal roofing.
Roof Traffic
The Batten tiles by Gerard are installed from the ridge down.
When walking on the installed tiles, walk on the front edge of the
low sections where the two rows come together and are attached
to the battens. Avoid stepping on side laps.
Footwear
When it is required to walk on the Gerard tiles, rubber soled
athletic type shoes or similar soft soled footwear is recommended
to avoid damage to the finished product and to provide grip for
safety.
Roof Pitch
The Gerard tile is designed to be installed from a minimum of 4:12
pitch up to a vertical face in all climates and down to 3:12 pitch in
warm weather climates. For slopes under 3:12, the tiles act only
as a decorative roof covering. In this type of installation please
consult our technical department (1-800-237-6637) and the local
building officials.
Underlayment
Underlayment is generally required by most building codes. When
allowed by the building code, underlayment is not required in re-
roofing over existing composition roofs when the existing roof is
in acceptable condition to act as the roofs underlayment. The
exception to this condition will be in areas of extreme weather
conditions where the underlayment should be of a type required
by the local building code and official.
Galvalume
The Gerard Stone Coated Steel Roof System is produced
exclusively from long lasting Galvalume Steel. The Galvalume
coating will react unfavorably if in direct contact with lead or
copper in a wet environment. Rain water run-off from copper
roofs onto a Gerard Roof should be avoided as the run-off can be
aggressive in nature and may attack the finishes. Only approved
fasteners should be used. Please consult the technical department
for recommendations.
Pressure Treated Battens
The use of copper based pressure treated lumber should NOT be
used when installing Gerard roofing products. The use of such will
void the lifetime limited warranty offered by Gerard. Any
questions call our technical department at 1-800-237-6637.
Use of Fasteners in Saltwater Areas
All exposed fasteners used for the installation of Gerard Roofing
products within one mile of non -freshwater properties must be
stainless steel.
Severe Weather Conditions
If the area to which the Gerard panels are to be installed is prone
to severe ice, snow, water or wind, additional measures may be
required. Please contact the Gerard technical department for
more detailed procedures 1-800-237-6637.
Installation Labor
A minimum two-man crew is recommended from start to finish.
This will provide a cost effective, quality installation. A qualified
two-man crew is generally able to install a minimum of one
square (100 sq. ft.) per hour under normal circumstances.
LM
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A =HEADWATERS Product January 2016
I�
UMAKU
Canyon
Shake Counter Batten & Batten
Best Installation Sequence
When installing on a counter batten and batten system:
1. Begin with code compliant underlayment (minimum #30 felt)
2. Install 1"x4" framing and counter battens fastened from the bottom up
3. Install panel battens from the bottom up
4. Begin laying panels from the top and work down (Install the first full course of panels
below the short course at the ridge first)
5. Lay field panels with the correct offset/stagger to cover major areas of the structure
quickly (including sub -panel for pipe flashings)
6. Install the detail panels at hips, rakes, valleys and ridge
7. Install trim and flashing
8. Caulk and seal all flashings
9. Touch-up any areas that may be required
70
Cz
a
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A 'Y HEADWATERS Product January 2016
Fascia
P f ^3
I eaE.
UL
Canyon
Shake Counter Batten & Batten
Roof Preparation
*Gerard Canyon Shake can be installed over composition shingle or over solid sheathing (solid
sheathing will require code approved underlayment).
1. Re -roof over composition shingles, the procedures are as follows:
1. Cut back existing shingles flush with the perimeter of the roof.
2. Remove existing drip edge.
3. Remove hip and ridge cap.
4. Dry -in with a minimum #30 felt underlayment in proper "shingle" method as per
manufacturer.
2. New Construction or full Removal of existing roof, procedures as follows:
1. Remove all existing roofing materials to deck. Ensure deck is to local code.
2. Install new minimum #30 felt underlayment according to local code
requirements and manufacturer specifications.
3. Install valley materials including water barrier underlayment.
4. Install ice and water shield at all valleys, rakes and eaves.
Trim
Lake (Loot to WaA
Iley
Notes:
1. Make sure deck attachment is to code but at a minimum
8d x 2 3/8" Ring Shank Nails spaced 6" O.C.
2. Minimum underlayment should be ASTM D226 Type II
#30 felt fastened according to code.
3. Where fire barrier is required UL listed fire barrier with
valid evaluation report is approved when installed
according to code and ICC report.
4. Local building codes govern.
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A = HEADWATERS Product January 2016
-0
�
aU
b4
a,
GERARD
Canyon Shake Counter Batten & Batten
Counter Batten and Batten Install Detail
{ieYy: bb epryl i�7' Spi � d
I n1�rr rvrd, Wr^0 eM urs M
nTesrrC eX
rs 1-9 PP?Lr MY��CY.tr
9--V N-9a�)r /
NstYlwb rOrm.r+s �isrN RaWV � /
T�rNmpw' 9s�n. Sorin'
n ww rwwr a Isr4 r r.v
lbrjrl Yti! � yp mn 1'qw Nra� ��
erlww b W W d 1an1
taeosbbp �
CMrnM IRMr: b M Mrrr.Y 1's4'
1pLcpry N ff tl 4e'Y blbrra b
w.rtvrs...q N'OC mu
l erevr rve4er. 1pennY rHY» DM
n-
poen +oouob vopx s.s.sosn
wr> � bul eo�ryp t'r+�W moss.
tls Wdh1 sYSC i'
b wM �y /
rnYYW.
S—fwenrq:
T. 1.1w��—
"TY111W Mr IM 1' o.ef frNsn
GnPer1 Mess: 1}741's
4nM Vw4 W
Counter Battens: Nominal 1"x4" SPF 42
or better fastened to truss structure @ 24'
o.c. max. Fastener number, spacing and
size per curreports a app cat go product uad-
nation reports and focal governing buBd-
i1g codes.
I
Counter Battens and Battens:
1. Lay 1"x4" counter battens over roof trussing (Maximum 24" O.C.) bottom of counter
batten is to be in line with eave fascia
2. Fasten counter batten with fastener of sufficient length to penetrate truss by min. 1"
twelve inches on center
3. Install first row of battens even with eave and counter batten
4. Fasten battens with fastener of sufficient length to penetrate counter batten by min. 1"
5. If no counter battens are used, battens must be fastened into the roof trussing with
penetration of fastener a 1" min
6. Install second row of battens at 13-3/8" (this measurement may change depending
upon the eave line.
7. If eave line is irregular, second row of battens can be adjusted to allow an average of W
overhang of bottom panel
8. All successive battens spaced at 13-7/8" as spaced by the Gerard Batten Spacers
9. Batten ends must end over a counter batten
a.1
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A =HEADWATERS Product January 2016
. Pro!:Maq,
e 9.
IGEAR
Canyon
Shake Counter Batten & Batten
Eave Detail
Battens: to be nominal 21K2" spruce pine
fir #2 or better fastened to counter battens.
Fastener number, spacrng and size as per
Fastener chart.
Install using appropriate Gerard Roofing
Technologes' "Batten Spacers'. Spacing
between first two battens will vary to
insure panel layout t.._
Gerard Fascia Metal:
tight to structure_
At the rake edge:
Panels: Install bottom panel to extend past
fastxa +• J". Seat and chip screws at top
surface of panel.
Roofing tlnderlayment
Wrap min. 1' over finish
edges.
Counter Battens: to be nominal 1'x4"
spruce pine rrr #2 or better fastened to
truss structure. 24" C -C. Max.
Fastener number, spacing and size as per
fastener chart.
Rake Trim Detail
*shake Rake Trim: Fasten at sides into 1 "x3", Panels: Cut and bend panel
2"x2" or 2"x4" batten depending on need.
(For use with Canyon Shake only) and turn up 1" at rake batten.
Roofing Underlayfw3nt
Wrap min 1" o\'ctr j rrish edges
1. Inside edge of rake batten should measure 3" from the rake fascia
2. Fasten rake batten into battens with nails or screws
3. Cut Canyon Shake panel to the correct length. DO NOT CUT PANEL WITH SAW OR GRINDER
4. Fold Canyon Shake up at the rake batten minimum 1 %"
5. Install Shake Cap tight to the Canyon Shake turn up (for a tighter fit the Shake Cap may
be formed at the "hugger" bend to square the cap)
6. Fasten caps with two fasteners in the rake and one into the rake batten on the top of
the cap. Fasten panels as required
a.
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A =HEADWATERS Product January 2016
I UEKAKU
Canyon
Shake Counter Batten & Batten
Stone Coated Valley Trim Detail
B*ftns: to ft npnf110121fY wrote Arne
�f Q7 D' Deter'AM1m x cal rfer "Leri.
P'MY^RI ftnite/. &r*VV ord sae is per
4-swer Chet'.
IRS134 org 0r,"WWt Qet*e0 ROOM
11ih"02ei 'B"V- 9MC-1- f uttp
t s e tettey Kftn 2'Yi''Oaftens.
8*thin aDDatnp ---.
NS Tie 14i
eantrn slake •: _ ose*fc Vfa►r: rmtrntath
"-er, D.t9 14' skies as 2r 0 mr.
Emma ±' 4n teT,rd ICBG*
At the valley intersection:
ecur4w B*Crnc x be !'arrel t'YJ'
solute v"t "*2 e' pfnrt test@Rea %
mZu+n ler rg. 2a' CC Met.
f &Wfw n.0-ftf, SC40M *1#f Vn Is ret
"Wene' t -an �-
Psnr:i: C3 tt*li t"I pvet x *r:? r, Dh1
tr acorn nb .e.at.�
!Ia flrkauna"I'Menl:
•.twetrett
2 cha nta csnMuss xasn
ZY
1. Frame valley with two (2) 1"x4" counter battens
2. Place 2"x 2" nominal battens spaced 6" O.C. centered in valley trough
3. Install 6" stone coated valley fastened 24" O.C. on both sides
4. Measure, cut and form panels to fit valley angle DO NOT CUT PANEL WITH SAW OR
GRINDER
5. Turn 1 t/<" of panel into the valley pan
6. Fasten panels as required (DO NOT fasten in valley trough)
NOTE: valley can be formed with a closed detail
7. The same technique is used but with the panel turn downs meeting in the center of the
valley pan
NOTE: other valley material is available (see full install manual for details)
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A =HEADWATERS Product January 2016
MMM
Canyon
Shake Counter Batten & Batten
Hip Trim Detail
At the hip intersection:
: Fasten at sides.
anyon Shake only)
3anels: Cut and bend panel on
angle and tum up l } at hip battens.
1. Position a nominal 2"x2" batten centered on the sheeting joint
2. Fasten batten into every panel batten
3. Place second batten directly on top of previous batten and fasten 12" O.C.
4. Cut Canyon Shake panel to match hip angle. DO NOT CUT PANEL WITH saw OR GRINDER
5. Bend Canyon Shake panel up against stacked battens (minimum 1 %")
6. Shape and install Shake Trim with two panel screws, one on each side, into the 2"x2"
7. Fasten panels as required
8. Optional: the hip battens may be set 5" apart to have panels finish to the battens
Panels: Cut and bend panel on
angle and tum up 11" at hip battens_
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A = HEADWATERS Product January 2016
Canyon Shake Counter Batten & Batten
Wall Trim Details
Battens: Nominal 2"x2" SPF 42 or better
'a;tened to counter battens or structural
taming
Gerard "Z" Bar: Fasten to structure with
appropriate fasteners 12" o.c. max Seal
top with approved sealant. Panels: Cut and bend panel
,, - to length and tum up at sidewail.
Roofing Underlayment:
Turn up min. of 3" at sidewail.
Counter Battens: Nominal 1"x4" SPF #2
or better fastened to structural framing @
24" o.c. max.
At the wall intersection:
1. Measure, cut and form Canyon Shake panel to the correct length. Panel turn -up
minimum 1 %" DO NOT CUT PANEL WITH SAW OR GRINDER
2. Fasten panels as required
3. Flash panel turn up with Z -bar
4. Fasten Z -bar with appropriate fasteners maximum 16" O.C.
5. Caulk Z -bar with gun grade polyurethane sealant
Head! Vertical Wall
Battens: Nominal 2"x 2' SPF #2 or better
fastened to counter battens or framing st-
ructure under.
Fastener number. spacing and size per
current applicable product evaluaiton
reports and local governing building
codes. go
Gerard "Z" Bar:Fasten with appro-
priate fastener 12" O.C. max. Seal
top with approved sealant.
Roofing Underlayment:
Turn up 3' min at headwall.
Panels: Bend and cut "Short Course'
as needed to fit panel and batten fay
out. Use 1"x 4" SPF #2 or better to st
pport cut panel.
Counter Battens: to be nominal 1"x 4" SPF #2 or
better fastened to structural framing @ 24" o.c.
max.
Fastener number, spacing and size per current
applicable product evaluaiton reports and focal
governing building codes.
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A Z HEADWATERS Product January 2016
k
Canyon Shake Counter Batten & Batten
Flashing Detail - Backside Chimney, Skylight etc,
Battens: Nominal 2"x2' SPF 42 or better
fastened to counter battens or structural
framing. --1
Panels: Bend and cut bottom
edge to fit. Top saddle to be
tent short to create diverter.
Fasten and seat with approved
sealant.
Note This must be done as to
not leave a joint behind wall (<36).
Custom pan must be used if solid
mill not suffice.
Behind Chimney, Skylight, etc.:
Counter Battens: Nominal 1"x4 SPF #2
or better fastened to structural framing @
24" o.c. max. -,
Roofing Underlayment:
Turn up wall min. 6"
1. Measure, cut and form Canyon Shake panel to the correct length. DO NOT CUT PANEL
WITH SAW OR GRINDER
2. Fasten panels as required
3. Flash panel turn up with Z -bar
4. Fasten Z -bar with appropriate fasteners
5. Caulk Z -bar with gun grade polyurethane sealant
6. An overlay of a diverter maybe installed to move water farther from corner detail
NOTE: Make certain that NO panel side lap joints are installed behind the curb or wal I
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A _-!,:', HEADWATERS Product January 2016
Canyon Shake Counter Batten & Batten
Non -Vented Ridge Detail
Shake Ridge Trim: Fasten at sides. Seal
and chip exposed screw,
jFor use with Canyon Shake only)
At the ridge:
1. Stack two (2) nominal 2"x2" on the ridge and fasten to the structure
2. Cut and bend Canyon Shake panel to size needed. DO NOT CUT PANEL WITH SAW OR GRINDER
3. Install Shake Cap, fastening into the 2"x2" on each side
4. Fasten panels as required
Vented Ridge Detail
o:.,..,. Frim. a. ..r-
Canyon Shake only]
At the ridge:
1. Make certain that appropriate opening is provided in roof decking (equal to soffit venting)
2. Stack three (3) nominal 2"x2" on the ridge and fasten to the structure. Number of
battens varies with roof pitch
3. Install vent material to stacked 2"x2"'s
4. Cut and bend Canyon Shake panel to size needed. DO NOT CUT PANEL WITH SAW OR GRINDER
5. Install Wind Soffit to bent panel
6. Install Shake Cap, fastening toward the bend of the cap, into the 2"x2" on each side (2) L.f)
maintaining air space r --q
CU
7. Fasten panels as required
a
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A = HEADWATERS Product January 2016
Canyon Shake Counter Batten & Batten
Roof Traffic Locations
For roof areas that will receive frequent traffic (around roof -top mechanical units, TV antennas,
chimney areas, etc.) install a 1"x 4" batten four to five feet in length between each regular
batten row up to and around where the foot traffic pattern will be. Fasten the traffic batten
into the decking to maintain its position.
This technique can be used in areas that may have addition impact from snow loads or snow fall
from higher roof elevations to prevent excessive denting of the panel.
Traffic Batten
Standard Panel Fastener Locations
High Wind Panel Fastener Locations
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A =HEADWATERS Product January 2016
V
Cz
a
Shake Counter Batten & Batten
Double Pan (Sandwich) Pipe Penetrations
1. If dry -in state is required, a sub -pipe jack may be installed with dry -in material
2. Install minimum #30 felt under batten system
3. Install one Canyon Shake panel with a hole of sufficient size to fit easily around pipe
4. Size and form granule coated steel pipe boot and seal it to under -panel
5. Cut the second panel tightly to the boot
6. Set the panel over the boot
7. Caulk and chip the hole and the top of boot
NOTE: other flashing methods are available. Contact technical support or review full Installation
Manual
a
Canyon Shake Counter Batten and Batten Installation
Gerard Roofing Technologies I A =HEADWATERS Product January 2016
�. CITY OF WHEAT RIDGE
_1�9�Building Inspection Division
(303) 234-5933 Inspection line
'(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: t2ofz;
Job Address:
Permit Number:
Ooh
a4 -
P_ -
P_ o one available for inspect io Time 1II) AZ/ M
Re -Inspection required: Yes No
*When corrections have been made, call for re -•h' pection 30 234- 3
Date: 1 v 12. 1 _�- Inspector:
DO NOT REMOVE THIS NOTICE
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: -3 O
Job Address: Y06 0 y l& 1/ S/'
Permit Number: '9017lJ 661
❑ No one available for inspectionjime2akJ AM/PM
Re -Inspection required: Yes (Do'
When corrections have been made, cae-inspection at 303-234-5933
Date: 9 l 7 Inspector: A7
DO NOT REMOVE THIS NOTICE
DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number:
BUILDING INSPECTION LINE - 303-234-5933
CITY OF WHEAT RIDGE Date:
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215 - (303-235-2855)
12572
8/6/01
Property Owner:
Property Address: 4190 DUDLEY ST
Contractor License No.: 18068
Company: Metropolis Heating
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
Phone: 421-9974
Phone: 233 1307
Construction Value:
Permit Fee:
Plan Review Fee:
Use Tax:
I hereby certify that the setback distances proposed by this permit application are accurate, and
do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or
covenants, easements or restrictions of record; that all measurements shown, and allegations
made are accurate; that I have read and agree to abide by all conditions printed on this
application, and that I assume full responsibility for compliance with the Wheat Ridge Building
Code (U.B.C.) and all other applicable Wheat Ri ordi ces, r work under this permit.
(OWNEIR)(CONTRACTOR) SIGNED
Use:
lli ~&iilJ
DATE ~-<O -of
Total:
Description:
GAS FIREPLACE INSERT AND GAS LINE
$2,486.00
$83.25
$0.00
$37.29
$120.54
--
Approval:
Zoning:
........
Approval:
-.-1.-
Approval:
Occupancy:
SIC:
BUILDING DEPARTMENT USE ONLY
Sq. Ft.:
Roof:
Stories:
Residential Units:
Walls:
Electrical License No :
Company:
Plumbing License No :
Company:
Mechanical License No :
Company:
Expiration Date:
Approval:
Expiration Date:
Approval:
Expiration Date:
Approval:
(1) This pennit was issued in accordance with the provisions set forth in yopur application and is subject 10 the laws of the State of Colorado and to the Zoning
Regulations and Building Code of Wheat Ridge, Colorado or any other applicable ordinances of , the City.
(2) This permit shall expire if (A) the work authOrized is not commenced within sixty (60) days from Issue date or (B) the building authorized is suspended or
abandoned for a period of 120 days.
(3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be made in the
original plans and specifications and any suspension or abandonment has not exceeded one (1) year, If changes are made or if suspension or abandonment
exceeds one (1) year, full fees shall be paid for a new permit.
(4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
(5) Contractor shall notify the Building Insfector twenty-four (24) hours in advance for all inspectIons and shall receive written approval on inspection card before
proceed"" g with successive phases 0 the/'ob.
(6) The ce of a permit or the approval 0 draWings and specifications shall not be construed to be a permit for, nor an approval of, any VIolation of the provIsions
f. b d~ any other ordmance, law, rule or regulation
, //IA4'--.
Chief Buildi~nspector '
DEP~\RT:vrE'IT OF PL\:"!:"!!"!\' .\'iD DEVF.LOPvlE'IT
BUILDL'lG L'lSPECTION LL'lE - 3113-234-5933
CITY OF WHEAT RIDGE
751111 WEST 29TH A VE:'iuE
WHEAT RIDGE, CO 8112]5 - (3113-235-2855)
APPLICA T/ON
f31J1lriin~ .[J,~...",iT '<''!'If-,,~..
Date
o 11 /1ylZ..E:..
~/9o bv t)LeY
li'o6g'
//? f 7'1UJ JOI1L I ,
ST
Phone:
'/;(1- 997~
Property Owner:
Property Address:
Contractor License ~o..
Company'
Phone:
-::l33-130?
OWNERlCO;....TR.-\CTOR SIGN,..I.TFRE OF U:"-TIERST.-L'mL'iG '-\'.'m "\GREE;-"IE~I
Construction Value:
Pennit Fee
Plan Revie\v Fee"
T;.;:p T::pc
;I, 'fU'. vv
r n",arb~ ;;enit\' that the setback dist.J.nces proposed by this permit application Me
accurate, and UO not violate appJicabk ordinances. rules or regulations of the City
{)f \Vhe:J.t Ridge or c:ovenanLs. easemer;L~ or restrictions of record: that all
measur<C'ments shown. J.nJ :ll1e!;~l.tjor1.'i made Me ,to.:;:;uratc::: thJ.1 I have ,<::td and
:tgree (0 abide b:"aII ..::onditions printed on :;us ;Lpplic.1lions and that [ J..Ssume tiJiJ
r,:sponsibility tor ;;ompliance with the Wheat Ridge Building Code (L.B.C) and
a.ll other applicable Whea.t Ridge Ordinanc ,for work under this permit.
Total:
(C\N:\"E~Y':D0.7R.~.C,";,"CR> SrG~";ED
Dxr" 8-6-01
DeSCrIption:
6lfs
~E:PLJ4c.e
INS,S::K--r
Avo
&415
(j /VI:
BUILDL'IG DEPARTMENT USE ONLY
ZB~wgi.':G8@n~~_~:
Approval:
Zoning:
SIC
Sq.Ft.
...-.-.......--.....-..........-...
Building Comments:
Approval:
Public WOrks. Colll1l1ents:
Approval:
Occupancy:
Walls:
Roof:
Stories:
Residential Units:
Electrical License No:
Ccmpany:
Plumbing License No:
Company:
Mechanical License No:
Company:
Expiration Date:
Aj:proval:
Expiration Date:
Approval:
Expiration Date:
Approval:
(1) Th1S permit I),'a,s issued In accordance With the provisions set forth in your applicatIon and is subject to the laws or the St.l!:: ot" Color~do :!J1d to the ZOnln~
Re~.llations and Building Code ol\.Vheat RIdge, Colorado or any other applicable ordinances Olthe CIty
(1', This permIt shall expire 1f(.'\) the work authorized IS not commenced wilhin si:<ty (60) days trom issue date or (8) the bUilding .1uthorized IS su.spended or
abandonc:d:"ora period of [:0 days.
(3; If this permit expires. a new permit may be acquired lor .11"<:e of One-haJf the ,1mount normally required, ?rovided no chanbes h,we been or will be made in
the on~al plans md specilications md my suspension or Jbandonrnent has net ~xc~eded one (1) year. If changes have been or if Suspension or ,1bandonrnent
exceeds one (I)yenr, iulIf<:es shall be paid lor a newperrrnt.
(4) No work 01 ,mY mannersh.~jl be done that will change t."e naturall10w ofwater causing a drainage problem.
(5) C'>r1trac:cr shall notIfy the Budding Inspector twcmY-(our (:24) hours in advar.ce lor all inspections and ~hall r::c::lve '.lITitten .1pproval on inspectIOn C.1fd before
proc<:edlng with succeSSlV" pnasesolt,""Job
(6) The issuance 01 a permit or the apprOVal of draWings and specilicatlons shall not oe construed to be J permlt for. nor ,1n approval of. .myviol.ltlon o(the
ProVtSlOns of the bUIlding codes or any other ordinance. law. rule or regulation.
Chief Bll1lding Inspector