Loading...
HomeMy WebLinkAbout3841 Tabor Court'2""J/'p05�7-7 Thr (fi INSPECTION ONLINE FORM. INSPEu )N RLCORU .rneatridge.co.us/forms.aspx?fid=79 JUEST LINE: (303) 234-5933 07 Occu c T",/ne Inspections will not be performed unless this card is posted on the project site. **Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Comments Initials Pier Concrete Encased Ground (CEG) Foundation / P.E. Letter Do Not Pour Concrete Prior To Annroval Of Thp Ahnvd% llnenorr+innc Do Not Cover Hndprnrnund nr RaJnw/In_Clnh U/o%rir Ov.— Y_ A............1 nr -r1__ w __ __ 0___ __ Rough Inspections Date - Inspector - - - r....... .. ........v.` n��r W%,LIWIlat Comments omments Wall Sheathing Mid -Roof L' Lath / Wall Tie Rough Electric " Rough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw/ Nail Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing Final Mechanical Roof Final Window/Doors Final Building NOTE. All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. *Pnr 1—, • X14 - .. .r.i4- MI,.....,. ZJ 11-H lul- 01c w1I1PIU U I1U111 Ll 1U rile vlslnci ano electrical low voltage by the Buildinngg DivivisionsionD. . Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather City of Whew Residential Roofing PERivi t 1 PERMIT NO: 201702877 'JED: 06/29/2017 JOB ADDRESS: 3841 Tabor CT EXPIRES: 06/29/2018 JOB DESCRIPTION: Residential Re -roof to install Owens Corning asphalt shingles - 38 sq. *** CONTACTS *** OWNER (714)366-6098 PHAM, HANH SUB (303)332-6224 Chuck Gardner 021423 GARDNER CONTRACTING, LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 11,970.00 FEES Total Valuation 0.00 Use Tax 251.37 Permit Fee 236.00 ** TOTAL ** 487.37 *,* COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding Al -z -inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturers€"s installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer&#39;s technical representative stating that "the application of the roof_ at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. F 111DWA i CITY OF WHEAT RIDGE _1�9�Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: M/0 Job Address: 3 ail Ty j' Permit Number: 'L f i 7 7 d✓ ❑ No one available for inspection: Time AM/PM Re -Inspection required: Yes No When corrections have been made, call for re -inspection at 303-234-5933 Date: b // 7 Inspector: M-rA DO NOT REMOVE THIS NOTICE City of Wheat Ridge Residential Roofing PERMIT - 201702877 PERMIT NO: 201702877 ISSUED: 06/29/2017 JOB ADDRESS: 3841 Tabor CT EXPIRES: 06/29/2018 JOB DESCRIPTION: Residential Re -roof to install Owens Corning asphalt shingles - 38 sq. *** CONTACTS *** OWNER (714)366-6098 PHAM, HANH SUB (303)332-6224 Chuck Gardner 021423 GARDNER CONTRACTING, LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 11,970.00 FEES Total Valuation 0.00 Use Tax 251.37 Permit Fee 236.00 ** TOTAL ** 487.37 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding A'-�-inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer&€TMs installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer&439;s technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201702877 PERMIT NO: 201702877 ISSUED: 06/29/2017 JOB ADDRESS: 3841 Tabor CT EXPIRES: 06/29/2018 JOB DESCRIPTION: Residential Re -roof to install Owens Corning asphalt shingles - 38 sq. 1, by my signature, do hereby attest that the work to be performed shall comply with all accompanyini approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and thaf I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. 1 further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. if this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for or an approval of, any violation of any provision of any applicable code or any-oAinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line. Antoinette Kulick 2 01 702 qV From: no-reply@ci.wheatridge.co.us Sent: Monday, June 19, 2017 10:44 AM To: Permits CommDev Subject: Online Form Submittal: Residential Roofing Permit Application Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. Permits are currently being processed within 3-5 business days, subject to change based on volume. CW For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN � O REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes l residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email Address 3841 Tabor Ct Hanh Pham 7143666098 Field not completed. 7V- Do you have a signed Yes contract to reroof this property? It will need to be provided at the time of permit pick-up. CONTRACTOR INFORMATION Contractor Name Gardner Roofing Contractor's License 021423 Number (for the City of Wheat Ridge) Contractor Phone 3033326224 Number Contractor Email Address NickM@gardner-contracting.com (permit pick-up instructions will be sent to this email) Retype Contractor Email NickM@garnder-contracting.com Address DESCRIPTION OF WORK Are you re -decking the No f roof? Description of Roofing OC Duration Material Select Type of Material: Asphalt If "Other" is selected Field not completed. above, describe here: How many squares of the 38 material selected above? Does any portion of the property include a flat roof? If yes, how many squares on the flat roof? No Field not completed. 2 TOTAL SQUARES of all 38 roofing material for this project Provide additional detail House 5/12 2 Story here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract 11970 value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant Nick Martens Email not displaying correctly? View it in your browser. 3 ' 1 1 909 Telluride St, Aurora, CO 80011 303-332-6224 Phone -866-524-1369 Fax To: Hanh Pham 3841 Tabor Ct Wheat Ridge CO 80033-5352 623-606-5415 / 714-366- 6098 hanhda(a),yahoo.com June 5, 2017 Roof Proposal Job Address: SAME Gardner Contracting, LLC hereby submits specifications and estimates for Nationwide Claim#195493-GF: Tear off haul and dispose of existing roofing material on house. Install new synthetic underlayment, perimeter drip metal, ice and water shield in valleys and around penetrations. Replace pipe jacks, flashings and roof vents. Install Owens Corning Tru Def Duration roof system. Color Driftwood Provide "FREE" non -prorated, transferrable roofing warranty. Replace 2 coach lights on front of garage, Replace large downspout on right elevation. Paint rear and small left elevation damaged by hail. Pressure wash and stain fence. Remove and replace 2 windows on rear elevation. Repair and replacement items will be color matched in order to comply with HOA guidelines. Permit fee to be added to final invoice and reimbursed by insurance carrier. We hereby propose to furnish labor and materials - complete in accordance with the above specifications, for the sum of $ 23,903.58 (Plus Permit) with payments as follows: $ zero down and balance in full upon completion. Gardner Roofing, LLC shall hold in trust any payment received from you until Gardner Roofing, LLC has delivered roofing materials at the site or has performed a majority of the roofing work on your property. Gardner Roofing, LLC's workers' compensation and liability coverage insurer is Colorado Insurance Professionals, 303-755-8600. Property Owner is—X– / is not _ intending to make payment from the proceeds of a property and casualty insurance policy. All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon accident, or delays beyond our control. This proposal subject to acceptance within thirty days and is void thereafter at the option of the undersigned. This price does not include any supplements approved by Insurance Company including but not limited to Permit Fee Authorized Signature: M.ediita _6�J��2017 Acceptance ofproposal - The above prices, specifications and conditions are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Failure to pay will result in a property lien and an interest charge of 1 M2% per month will be made on balance unpaid. Date of Acceptance: June 5, 2017 Signature You have the right to rescind this contract and obtain a full refund of any deposit within 72 hours after entering the contract. If you plan to use the proceeds of a property and casualty insurance policy to pay for the roofing work, you may rescind this contract within 72 hours after you receive written notice from the property and casualty insurer that your claim has been denied in whole or roofing work actually performed in a workmanlike manner consistent with standard roofing industry practices. Gardner Contracting, LLC cannot pay, waive, rebate, or promise to pay, waive or rebate all or part of any insurance deductible applicable to the insurance claim for payment for roofing work on your property. i CITY OF WHEAT RIDGE _:�9�Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: iRO F Job Address: 3 9 g l -rc hol" C t Permit Number: X170 a97 7 ❑ No one available for inspection: Time UO,2LI AM/PM Re -Inspection required: Yes No When corrections have been made, call for re -inspection at 303-234-5933 Date: % q11 7 Inspector: DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE _:�9�Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 90 F Job Address: 313y/ -r how G( - Permit Number: tol70 a97 % ❑ No one available for inspection: Time AM/PM Re -Inspection required: YesNo When corrections have been made, call for re -inspection at 303-234- Date:- % q11 7 Inspector: DO NOT REMOVE THIS NOTICE City of Wheat Ridge Municipal Building 7500 W. 29' Ave. Wheat Ridge, CO 80033-8001 P: 301235-2855 F: 303.237,8929 January 2 1 ", 2015 Standard Pacific 7800 E. Dorado PI., #220 Greenwood Village, CO 80111 RE: Previously Permitted project plans available for retrieval — Permit 0201400198 (New Single Family for 3841 Tabor Ct., Wheat Ridge) Standard Pacific, This letter is being sent to you because a project for which a permit was issued by the City of Wheat Ridge Building Division and plans and/or other documents were required was recently completed and approved. In accordance with the Building Divisions docurnent retention policy, the associated plans and/or other documents are scheduled for disposal. You may retrieve plans and/or documents between the hours of 7:30 am. and 3:30 pm., Monday through Friday, at the Building Division offices located at 7500 W. 29 Avenue in Wheat Ridge. am= City of ],�e'�Wft6atR ie COMMUN17Y DEVROPMENT wwwA.wheatridge.coms Geotechnical and Environmental Consultants Standard Pacific Homes Greenwood Village, CO 80111 Attention Ms. Ann McHugh Subject 3841 Tabor Court Lot 15, Block 2 Do Overlook Project Number 135307 2180 South Ivanhoe Street, Suite 5 Deriver, Colorado 80222-5710 303-759-8100 Fax 303-756-2920 www.agwassenaar coal i March 04, 2014 Reference: A.G. Wassenaar Report Project Number 135307, Dated 12/10/2013 Statement of Services Melissa Make y....-I I I I WIN III MINOR I From: Kathy Field Sent: Friday, June 20, 2014 10:04 AM To: Melissa Mackey Cc: Dave Brossman Subject: FW: Pond As-Built Attachments: JPEG imagejpg ME= <2 : : 2f, Admtrative Assistant Office Phone: 303-235-286 ■ I I m Hey Dave, • Tyler Robinson, EIT" • Staff Engineer • Direct: (303)-531-3218 3 �F 7 ?" ;� � - fru*4 MUM , A 1 T�72ar� Ajkl 2x4 PLAITOM FOR 25 LB. A L OAD. t w 7-7 y 30 4,13 TEL 115 T LLt -0,38 MIS � M 2403 MT20 19711" TCfX 210 Lu 1.16 9C c d VVIM -063 15-17 >494 100 OCL 0,0 Rop sbw )"a ! 0.2 2M? 0,24 11 We MA VVWpt, 9274 9d F a p StUtUa lwood s 4t 4 »11 at P pod or 2 b 1 Raw 43 mwpt 1-16s-15 ��6tx y i March 1 ,2014 Im m om" a 14 g-j 'mycim v, &-ig 0 ADDRESS: 3841 Tabor Court CITY. Wheatridge COMMUNITY: Fireside/ Doud Overlook BUILDER: Standard Pacific-Colorado SCCI REP: Robert Hutchinson 303-598-38* !TEMS NOT COMPLETED: 0 DATE: 4/9/2014 PO #: JOB #: PLAN #: 5060 A INSPECTION #: 1 STATUS: Passed J ye>e' ENERGY 0 Inspection Notes: 1 Unit I Duct Lkg Total, Passed @.77 cfms , Target: 128 cfms at 4% 2 Unit 2 Duct Lkg Total, Passed @:45 cfms , Target: 74 cfms at 4% (92014 Burgess Construction Consultants, Inc. Page I Inspection #901590 - Robert Hutchinson City of I1F City of Wheat Judge Municipal Building 7500 W� 29e" Am Wheal Ridge, CO $0033-8001 9l I'. 303.235,2846 F: 301235.2957 FOUNDATION SETBACK AND ELEVATION CERTIFICATION This form, including the Exhibit on the reverse side, must be fully completed by a Professional d re •Colora& and approval prior } construction.MING INSPEC711ON and before proceeding with anyfurther D * FEB 24,2014 PERMIT# ADDRESS.. 3641 TABOR COURT 1 DOUD OVERLOOK SUBDIVISIONSUBDIVISION I hereby certify that the elevation and location of the structural foundation for the above property described above has been treasured by me or directly under my supervision. The foundation setbacks and elevations for all building corners as stated hercin have been found by me to be in compliance with all municipal setback and elevation requirements, and all civil engineering and Building Permit construction plans as approved by the City of Wheat Ridge The MINIMUM . SETBACK Di TA C from the property lines have been determined to RC7%i°i. 6' REAR �u_ 6�° ^ _ � 511��. `.6' SIDE; � V- F The MINIMUM ELEVATION has been determined to : 6466.60` (NA g ). The above measurements have been determined on the following location: Check only one): Top of foundation prior to placement of concrete . Top of proposed foundation subsequent to placement of concrete �� iimt��e The setback and elevation measure g �m identified on the attached exhibit. iswnyws seal) Date FOR OFFICE VSE ONI,V AWWeAwl", inspector wwwAwh"trld&#.e0*#*RevOWU !. ... ! w;00,fi �► M M M fi W M k a > gfifi 0 rn- M IM # • fiP M M ri tlRfi ii M 0 *.,,. M M 122 Mwfi i fi M • • fi aM • fiM ♦ M • • M s W • M i M k M N M •P M fi • ♦ • w •♦ fi i fir fi ul P i fi A(A 2zm oM P TP fi P # P ~ � • •Po • f0z ji M... x Y M M • • fiPXZ> OwPt P , fiM P. rn ,, ._ M M 0 ¥P 8 L2 t * i i M * =f MMM fi r# Y •. Mu zf M M.. M.w ID ,. FP fi + no M-zqfi wr • a, v r • 5; 2-0 5; rrrNr mi CZE I 1 "28,0' .t rn 11 rr c c --r r rnr rn cy t 0 1,,. >tl {It Bey d1 .�,. X yV i Uf (A 0 La IIS rn ;u ca ry r7 r cs M rn ...r rr+°r N rrrNr mi CZE I 1 "28,0' .t rn 11 rr c c --r r rnr rn cy t 0 1,,. >tl {It Bey d1 .�,. X yV i Uf rn rn MO>4 Z 4>> rn ;u r7 r M rn ...r rr+°r rrt yy 5' UE/DE :5M �z . k .0' -r X "* 167 f ! .0' r i t�«a ` 51.0' 5.' ar 5' UE/DE N 9fi '4 " 42.00' i rn 2 ew flI7� 5040 4 0 pe-L- ry w t 3114- Permu #r 38 GENERAL INFORMATION Schedule: 461207 Parcel ID: 39-204-05-005 EbaLftla Status: Active Property Type: Agricultural M M M -11 4 01 I i11 !I A PROPEM DESCRIPTION Subdivision Name: 210700 - DOUD • VERLOQK allB RN�W— R � w t f � � IMAM � ���I�������NA�� ��.� y RN�W— R ATUDBUM''"'''w JIM= I Maximum Building Coverage (40%): a' / q � sq. ft. Total Proposed Building Coverage: 1, 3 'S' 13 _ sq, ft. -il 2112 % Is the structure within 2 feet of minimum setbacks? —4L _�— (If yes, add surveying condition FND.) 5175MR311 / ..: \f . ..�....... . .��.. . ..... :\ i f ¥& ?= = J /: \i# 4 » £' of Author % ±«!< Date his app < « a* mu be signed y each sw »+yam « « .+y # & }lim same Proof of Submission for Permitting/Plan Review A copy of this foral must be completed by each agency indicated on the Permit Submittal Checklist for the project type and be attached to the Building Permit Application at the time of submission, Applications preselited for Submission without a completed Proof of Submission forin from a required -39enCY will not be accepted or processed, Date No_Vefter 26 2013 ProjectAddress: 11885 Wost 3810 Avenue, Wheat Ridge, Colorado Narne of FirmAndivAlAl submitting docuimms: ILwan Haldesly, Standad Pmjlo of Coloralo, lq�L M-MARIMMIM. allm= i lmz#.; M. KMI 9XVMU 91N� AgencyNoteS.- The property is currently in the . ess of being includad - in t --------------- C ty of w at Ri dgc ('11 Y 01'WHEAT ItIME tIVILDING AND IMPECTION SHWICES DIVISION 1500 W 29th Ave Wheil Up, CO 80033-8001 p, 303.235,2855.f 3012ASQ9 qip ill I I 1� I I I MMIIIIMMMIIMIIIM�� A copy of this f6hir must 46 toqipleted by each agency Inditate on the Permit Submittal Checklist for the project I ty0e and be nt(pchod to the Building Pormit Application at the time of submiss Applications presented for submissioti witbout a completed Proof of Submission form febm a re4ifire, Agency will not be aooepted or processed. Date: 26,2013 Project Add S$: IW$ West 38(� Avenue, Name of FirmAndividual sUbmitting docurnents: Kieran Hardesty, Standard Pacific of Colorado, Inc. WMEMM Signat Date: Llre* 7 A-I� W- (Agency Representative) City of ,. INSPECTI CITY Or WIIFAT RIDGE BUILDING AND O 75 W 29th Ave Wheal Ridge, CO $0033-8001 p. 303.2351855f 301237.8929 z : . Name of flrrnfindivrcitt tt �Ittlne dractarrtents. Ktersn Ftsrd sty, Sunda(, Pacific cat Colorado, Inc. i �,q1 6bre�,k ;"SY arpyi Project Type/Description: Construction of 48 Now fn 1q,Famil F Doud 0vc3dpgkq 0diylslon. S of Firm Indicated below and do, by rn n duly authorized representative of the agency tfre laelew, hereby acknowledge receipt of documents necessary Indicated suave. • Wheat Ridge Sanitati • Clear Creek Sanitation Distric It • Fruitclate Sanitation District It Westridge Sanitation District • Other 4" 2180 South lVanhoo Strt�ot, S"fte- 5 A*%-wo W assenaar Oonvar. Colorado 80222-5710 303-759-8100 Fax 303-756-2920 www.agwassenaar.com MOV'r4lIX "00 01 1MT11K1#LZJJLW M= As requested, we have performed a soil and foundation study at the subject site. The purpose of our study was to observe subsurface conditions encountered and to recommend geotechnical design criteria for the design and construction of the foundation for the proposed residence. This letter presents a summary of our findings and recommendations. The field exploration included drilling a 4-inch diameter auger boring near the center of the lot to a depth of approximately 24Y2feet. The subsurface materials encountered consisted of 0' to 2' Fill, sand, medium dense, silty, slightly clayey, slightly gravelly, moist, mottled brown zl # - . # EMMM MMIMi � Depth to water: 13 feet at the time of drilling 12% feet 2 days after drilling Standard Pacific of Colorado, Inc. Project Number 135307 December 10, 2013 Page 2 P!roject Number 135307 #ecember 10, 2013 *age 3 Based upon our evaluation of the subsurface conditions at this site, it is our opinion that the slab performance risk for this site is low. If this risk of movement is not acceptable, engineered interior floors should be constructed. W NW ' I *A • following criteria: IF-11 NO I We are available to provide further consultation regarding basement slab performance risk assessments. During construction, the crawl space area should be checked for standing water or very moist conditions, construction debris, and other deleterious materials. If these conditions exist, the area q,hould be evaluated and mitigated, as necessary. Standard Pacific of Colorado, Inc. Project Number 135307 December 10, 2013 Page 4 99 as much as practical during construction. 2. The ground surface surrounding the exterior of the foundation should be maintained in such a manner as to provide for positive surface drainage away from the foundation. At completion of construction, we recommend a minimum fall away from the foundation of 6 inches in the first 5 feet. This slope should be continuous across the backfill zone. Standard Pacific of Colorado, Inc. Project Number 135307 December 10, 2013 Page 5 71MIM- ;-V�nT?Um Project Number 135307 December 10, 2013 Page • If we can be • further service in discussing the contents • this letter • in analysis of the proposed structure from the soil and foundation viewpoint, please call our office. Sincerely, '45��' 1 0 Re A. G. WAS EN R,,� to Of I 731 xio IN MMEEM PA rMo9d L. TayO�r,L�07 President BACKFILL CREATE MINIMUM 4" PATHWAYS THROUGH EDGE OF FOOTING OR UNDER THE FOOTING WITH SOLID PCV PIPE (NOTE 3) 08 FOUNDATION VOID MATERIAL. THE PATHWAYS SHOULD BE BENEATH EACH WINDOW WELL AND AT APPROXIMATE 15 FOOT INTERVALS AROUND THE FOUNDATION, DR k FTG I INT-SOG MTF JULY 2010 A.G. GeotechnicAl and Environmental Consultants FOOTING FOUNDATION TYPICAL INTERIOR DRAIN DETAIL City cif` W hcat R�i�c t Ct I WOR City of Wheat Ridge Municipal Building 7500 W. 29 Ave. Wheat Ridge, CO 80033- 8001 1'. 303.2351801 T 303.2351857 Dear Contractor: CC: File wwwA.wheatridge.co.us Rev 2(08 -8 0 C LO 0 - 0 7 0 irmence reRuirements. i , I - --SR390,6',67CFM,Reg1N4 A c Rom 7" J CFM,RagAW 2OXI(r \ SR 43OX,6 CFMA.9� 10.4 [AM191W, *;Y 1 1 0MM M OMM79 PWOP Install all other supplies ff I ry Pagel I x1 7" Drawn: Approved: Date: Job Number: SR 190,7 " „7rM,R":I0.4 SR-180,7 *:7$ CFM,RegAGxa j � j SR -'M "7 Q.7 ", 76 CFM,R9g:10x3 P r 7' 4 7` SR 110,6 ,48 CFIV,90910f,4 SR 200,'r,91 CFEA,Rpg 100 Gfei1 Room R 100,6',48 Cf`M,Reg l OX4 t y SR 210,7 ',91 CF ,F? gJOx4 �. -... . ...... 7'{ p! £ Mchen g q rpj gC.t;t7pt set 8 - ° "SR16t},7 ",6 #CFSki.R6g1.f47xA d fdtaC!4( fi {e 7yyy T yy yt iii t kt r Mad Rte tI,.mWsa zsi cam F 2- 2ox2O" CdOIes ! 4' ; s } ` Ca niri{t OM SWdW 7 {f 3 SR- 130 :36x+d ; { j Faye, i 7 ii �' � E f E 6„ ��, �6 �� .. Tr�nslst Grattes f#derr. present. 3 f ! Move above dear R bed 7 opt s 7" r c 7 SA x20.3 ",19CFM.Re9A0+1 j ti SR- 150,7 - ,80 CFM,RegIOx4 i t iii t i duet in space --Wed with R8 .. .. Main Floor Standard Pacific Fireside Plan 5060 Scat+ 1 /8 " = 1 ' Page91 xi?" Drawn: / Approved: Date: Job Number: I SR.330,7 ",65 CFMi,Reg.M11x4 SR448,7 ° „65 CFM.Reg:iox4 } rl 1 CPM,R4g:Y0z4. t Master Bed oom SR 220, C:FM4:Etcsg: OW4 ! SR-230,7',54 GFhi,F 0919x4 MsVCei§nV,12'.779 GFM,G,,Re:10 4 � Kati Cana` kr gl4 °rW OF ,G:d10 2t7x7C7 a # # 1 I � -3ats 4 °,41 f,FM.9cy7:MQx4 4 t t n # � 14X6 dCOr a mswu rcasert# S ..ad l S elow I” f 3 I s9 -24a.a GFM,€ g iQxi4,._, 44x10 , � o , ,,..� SR 310,6 °,36 CFM -1¢7x4 Ffath 2 =ram the ' "1 bsa t i 77 M L " CdU ! y wty* XT _ 2 f l _# 84 fewn 4 5,9 320,5 ",35 CFMG,Regl0.4 T Salh 3 z 4, Beea1412,� ;} arm P 593@0.6 °,4i CFM,f#Qd'10x4 ,✓ f+fx6" Tranver G"De 8R- 2,5£!,6',41 CFM,Pte6lOX4 d` I / ,r 3 {} SRA40,6 ®,37 CFMj46 111x4 SR26'0.6 ',37CFM,FR&g AOx4 ' SF<- 2Btd.7 ",5G GFM,6?es };14x4 s SR 290,4 %6 (' M,P3OQIOx4 $$ SR§ 70,5 °.21 CFM,RW10x4 __6 117 ('FM, wBfgza i house axhausl Fxhausl �Cxey VonC3;ahan SNat+lgy� ._...,,._.._.:._._..., _ .., n .. y .. _.p � . _+-tm------ .,. ..�.:,.n.:._....... Pagel I xl 7 Drawn: Approved: [late: .lob Number: Report Units, pressure. in.wg, Duct lengths. feet, duct sizes. inch, Arflow. CFM. Velocity . n n, Temperature. t° Number of active trunks. Number of active runouts7 3 Total runeut outlet airflow, 1,658 Main trunk airflow, 1,418 Largest trunk diameter. W6 SMT-610 Largest runnut diameter 7 SR-160 Smallest trunk diameter. 13.E ST -370 Smallest runeut diameter: 3 SR-1 m um M � I M�II���IMII�A���I�11NI1NII�C�M�� #INS R ' man w1 m�� � 1" amsUK i4! �M ! w �`� ,q «! • . skum m um i m���� wan mmmaNW&I'lim suallumaSkm w !" n WI QA a" , ;w a Y +»u� BE Y� f mum t Bl um R � ou SMA i law mum BOTTOM or KQXWIA souvwx nag= TWO.SM 3A NU * AN= Ty . mu ° mum MUM °m aw A a1pi Aw IBM NUMIMMEM NOWINUUMIA I man m Evaporator Coil Static Pressure PERFORMANCE DATA nt t a Y:\ ... \Standard Pacific- Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM Summer: 91 59 15% 50% 7 -39.04 Mein Trunk Runouts ;. Calculate: Yes Yes Use Schedule: Yes Yes Roughness Factor: 0.00300 0.01000 Pressure Chop: 0,1000 n.wg. /100 ft. 0.1000 in.wg. /100 ft. Minimum Velocity: 650 ft. /rain 450 ft.lmin Maximum Velocity: 000 ft. /min 750 ft. /min Minimum Height: 0 in. 0 in. I Maximum Height: 0 in, 0 in. � Winter Summer Infiltration Specified: 0271 AC /hr 0250 AC /hr 168 CFM 155 CFM Infiltration Actual: 0.326 AC /hr 0.308 AC /hr I Above Grade Volume: X 200 Cu.ft, X 37 200 Cu.ft. 12,115 Cu.ft. /hr 11,474 Cu,ft, /hr 0.0167 X 0.0167 Total Building Infiltration, 202 CFM 191 CFM Total Building Ventilation. 0 CFM 0 CFM I i __ ® System I -- - Infiltration & Ventilation Sensible Gain Multiplier. 14,39 = (1.10 X 0.817 X 16.00 Summer Temp. Difference) s Infiltration & Ventilation Latent Gain Multiplier. -21.70 = (0.68 X 0.817 X -39.04 Grams Difference) j Infiltration & Ventilation Sensible Coss Multiplier: 62,04 = (1.10 X 0.817 X 69.00 Winter Temp. Difference) Winter Infiltration Specified: 0.250 AC /hr (155 CFM) 4 summer Infiltration Specified. 0.250 AC /hr (155 CFM) Y :! .... \Standard Pacific - Fireside -Plan 5060,rhv Tuesday, February 18, 2014, 7 :51 AM Preview a� . Lat ._..�_. .�.� .m._ � _ Sys � �Sys� She t Ton its t1 Ares � Dint on } { an G aica Loss i�� A size Bua9c r 2.68 2 5,225 32,219 - 2,9€70 32,219 62,074 1,190 1420 1,420 system 1 2,68 2,139 6,225 32,219 -2,900 32 62,074 1,190 5,420 1,420 26x12 Duct Latent -549 0 Humidification 5 Zone 1 5225 32,219 - 2,:3..51 32,219 56,367 1,190 1,420 1,420 16x16 1 I-Rec Room I 1,107 1,007 -107 1,007 6,393 135 44 135 6,6 2- Sedroom 8 170 496 177 673 1,078 23 22 23 5 .Bath 6 56 7 " 7 288 6 0 6 3 i 4-Bed 8 Wic 38 17 -12 17 537 11 1 11 5-Mech 274 61 -46 61 2277 48 3 48 4 6- utility Closet 62 24 -18 24 836 18 1 18 3 7 -Dina A0pt Study /Bed 7 174 1,817 -87 1,817 3,004 63 80 80 7 8- Foyer 94 835 368 1 36 37 37 6 9-Pwdr 54 185 `116 ... 835 185 909 19 8 19 3 ; 10-Kitchen 457 1,837 -224 1937 1,897 40 81 81 7 11 -Great Room 318 5,183 -326 5,183 5,717; 121 228 228 7,77 12 - Nook 247 4,116 - 331 4,116 4,152 88 181 181 7,7 13- Project /Opt Bed 6 179 2,194 -70 2,194 2,986 63 97 97 6,6 14 - Mud Room 178 630 -301 63D 2,740 68 28 68 6 15-Loll/Opt Beds 349 2,461 %46 2,461 3,337 _504 70 108 108 7,7' r 16-Bath 2 65 168 -49 168 111 7 11 4 17- Bedroom 3 162 1,847 -34 1„847 3,036 64 81 81 6;6 I 18-Bedroom 2 181 1,680 7 1,687 2,657 56 "74 74 6,6 19- Laundry 94 133 0 133 212 4 6 6 4 0 -Bath 3 48 474 -46 474 694 15 21 21 5 1 -Bedroom 4 157 1,279 109 1,388 1,293 27 66 56 7 f 22 - Wic 2 97 434 -186 434 1,645 36 19 35 6 t 23 -Master Bath 210 716 -145 716 1,813 38 32 38 6 24.Wic 1 65 168 -49 168 503 51 7 11 4 25-Master Bedrooms 389 4 -278 4,448 6,161 130 196 196 7,7,7 Serra of room airflows may be greater than system airflow because 1 system room airflow option uses the greater of heatinq or coo inq. Y:\. .\Standard Pacific- Fireside -flan 5060.rhv Tuesday, February 18, 2014, 7;51 AM ,I 0,000 T I -t 69 fo Ana w m M 0 0 0 0 0 0 , T CD 0 0 M 0 3 0 0 CL CL CD 0 C9 Ul w 0 • 0 41 W -4 00 0 ww • • • Al 69 fo Ana w m M 0 0 0 0 0 0 , T CD 0 0 M 0 3 0 0 CL CL CD 0 C9 Ul w 0 Q 0 41 W -4 00 0 Ratem 1"000" ei unfinished basement-same size ----- --------- --------- ------ 7 7" 6" 390,6',6? CFM,Reg:IOX4 R R 7, ';M? 1 1 Mech Basement Standard Pacific Fireside Plan 5060 Page:1Ix17" North Drawn Approved: Date: Job Number: l i i SR 190 7 °,76 CFM,Req :10x4 f i SR 180.7 ".7 GFM,Rep:i¢rxa 4 SR 1707,76 Ci<M,8091 OX4 7 ,..,... SR - 200,7 ",61 C�FM, OA SR- t1 &3,9 :43{ CErdv�,£ieg;fgxai 5R 14ti,6',.48 CF ,Rag_1 ibx+F E ' ' A � � s KNa4sen 3 rc+M&OPI 60C 6 _.Sf2164,7 °,Hr Ca"AA,daeq.tN9 Tea?~,wer GrWe it ftor prowE:.,,„ .,. : a j V � i 1111 Roams i I� j 6 Pwdr ._..:..:_- r 4i €9¢ninWDpi Study +Bed 7 1 y I ' SRI 1:36,6 %5� C t R,Reg.10a. i l=ayer Transfer C;eMe H dray, pment.. Move above tilsw if bed 7 oV x (E SR S2A,3','#9 CFM,RegI0.4 2i j 3' SR4507 %80 CFM,A"AQx+t } SR 4407,6 ",37 C�M,ReglW # 3 i j lii duct 6n .....ditiosred space irssuided with H8 .µ. . 7 E t f ._..._.. .._.__._, r tale :1 f8 "�.1 __... Main FIc-ar Page:11x17" Standard Pacific Drawn. Approved: Fireside Date: Plan 5060 Job Number: y F r Q / P sR 2, CFM„Reg:10.4 $53 2:3G,! " „S4 CFAS.P,eg= tp.R+i � Mst, Ce&pg,12':,279 G.FM,CiG6ftA4x# i 1 t \\ } Nate Cei rrg „14'r8 CFhA,GMIe:2N24 t 14x6'° Tral*ol Geiide.7i,. SH 240,4 ",11 CFM,.ROg:1 14W Transfer SR 366. & ",41 CFM,Reg":.i6,4 F 1!dXH" Tramfer G,9te SR- 250,6 °,41 CFM,96610x4 d , SR 440,6 ^,3 "X CC�h €,t3;!g iUa4 SN- 260,6`,17 CFM,Rep':i0x4 t SR - ,,5 CFM,RegI0.4 f � ,? R 5k2- 1 90.4 - ,9 (4M,R0910.4 SR � ?0,5+ ".2t CFhI,RegAOx4 6 112 CFM, xrhete house exhaust- 5:xha,M p Cn l _„5R- ;300,9 ",1'1 CFM,RegAN4 1,S,9 310,0`,38 CFM,RWlOx4 C,FM,RegAN4 vdy VenlEiaSrutl SUd7egy� 2nd Floor Standard Pacific Fireside Plan 55060 Scale.118 "-1' Pagel Ix17" f Drawn: Approved: Date: Job Number: Manual D Standard Pacific-Fireside-Plan 5060 NOTE: Manual D Data from Elite Software Duct Sizing Program. EQUIPMENT*- Furnace = Carrier Model 9SC2B I.00S21. - -22 (100000 BTU) Evaporator Coil Carrier Model C PV 4821AL*+TDR (4 Ton) Asir Conditioner Carrier Model A I3NA.042 * ** (A.,B ) (3.5 Ton) Friction Rate, Total Effective Length, Static Pressure (from Duet Sizing Program) Report units: Pressure: in. g, Duct lengths: feet. Duct sizes: inch, ,lrflow. "M,Veloc : . /rain, Temperature: Motes. Static pressure available values for return dine are at the entrance of the duct. For supply, they are at the exit. The cumulative static pressure loss value for a return trunk is with respect to the entry point of the return runout upstrea with the highest static pressure available. Total and cumulative static pressure loss values for the supply main trunk include any device pressure lasses entered, and the cumulative may also include the total static pressure loss of the return side. Number of active trunks: Number of active runouts; 35 Total runout outlet airflow. I Main trunk airflow: 1,418 Largest trunk diameter: 113.E SIVIT-5 10 Largest runout diameter: 7 SR-150 Smallest trunlr diameter :: 13.7 ST-370 Smallest runout diameter: 3 -10 Fan Performance .. w w . BMW OMAN= P.�' . . ", R. 4 A4W I Y sum M IS IM .�`"'9 M w R I �r�� F + U , .. � � aw ..�,. AW �� # �smou a _ "�. trig: � Emm Lag was wR wo�,y,���� p ^ N ♦ � k. .. � ., N ° �# :. R tltlkk w �p.Y i um � �, # ��� R am R�Np. I M1n M �; A��� �FYnI�Y. Y� 1111111 an mf man ounwam i BOTTOM or TWO-SIDES 3A w.f s� R N wlAf�b I�IIII a 1 a 1 _ . .._...,. . , .... � R . N ice IM M Y 4�` ,gip BOTTO +W b ]� �W w r °' • � f s ������� w'�'��r��"�w�R � � ��' ��'�� �^ �, BOTTOM or m1g. "Iffloluix low= INUR mum TWO-SIDES 3A NOUN a MI NIMU M M F w a Detailed cooling capacity DETAILED COOLING CAPACITIES# CONTINUED AHRI Used w® =j"Standard Air Conditioner model "Urnber CAI * * * * B 10 v* 21AL * + In* CARMER AIR CONWTIORM Mmuffecturer CAMER AIR CONDIMMUG 140~twer Ion 416 t wady LO 13.2 eSpeed ii arente luffobor "112 41600 war wOrranly 6yeare . 'WAY 6 years rtanv 6 years wranly 6 year r Y:\..,\Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February 1 8, 2014, 7:51 AM Summer: 91 59 15% 50 75 -39,04 Maim Trunk Runouts Calculate: Yes Yes Use Schedule: Yes Yes Roughness Factor: 0.00300 0,24 0.01000 Pressure Drop: 0.1000 in.wg. /100 ft. 0.1000 in.wg. /100 ft. Minimum Velocity: 550 ft. /min 450 ft. /min Maximum Velocity: 900 ft. /min 750 ft. /min Minimum Height: 0 in. 0 in Maximum Height: 0 in. 0 in. 8 X9 Yes 4 I i t i I I I Winter Summer Infiltration Specified: 0.271 AC /hr 0.250 AC /hr 165 CFM 155 CFM Infiltration Actual: 0.326 AC /hr 0.308 AC /hr Above Grade Volume: X__37 200 Cu.ft. X 37 200 Cut. ! 12,115 Cu.ft. /hr 11,474 u.ft./hr X 0.0167 X 0.0167 Total Building Infiltration: 202 CFM 191 CFM Total Building Ventilation: 0 CFM 0 CFM -__System 1. __ Infiltration & Ventilation Sensible Gain Multiplier: 14.39 = (1.10 X 0.817 X 16.00 Summer Temp. Difference) Infiltration & Ventilation Latent Gain Multiplier: -2130 = (0.68 X O3 817 X -39.04 Grains Difference) Infiltration &. Ventilation Sensible Loss Multiplier: 6Z04 = (1.10 X 0.817 X 69.00 Winter Temp, Difference) Winter Infiltration Specified: 0.250 AC /hr (155 CFM) Summer Infiltration Specified: 0.250 AC /hr (155 CFM) 1 Supply Main Cond. Space 0.12 8 1449.5 Yes 1 Return Main Cond. Space - 0,24 8 391.8 Yes 2 Return Attic Attic 16B 0.24 8 1253 Yes 3 Supply Garage Open Crawl 0,12 8 X9 Yes 4 I i t i I I I r:\...\Standard Pacific- Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7 :51 AM Load Preview Y,\ ,,\Standard Pacific-Fireside-Plan 5060,rhv Tuesday, February 18, 2014, 7:51 AM m f Son I L t t I Bon i s Hg (g' S SS A Duct Scope . are a, e a 'al" Corm am G � CFM 7k_ CFM Size 2,68 2,139 5226 32 „219 -2,900 32,219 63,074 1,190 1,420 1,420 System 1 2,68 2,139 5R25 32,219 -2,900 32,219 6Z074 1,190 1,420 1,420 25x12 Duct Latent -549 0 Humidification 5,708 Zone 1 5,225 32,219 -2,351 32,219 56,367 1,190 1,420 1,420 1606 1 -Rec Room 1,107 1,007 -107 1,007 6,393 135 44 135 6,6 -Bed m 8 170 496 177 673 1,078 23 22 23 5 3-Bath 6 56 7 -5 7 288 6 0 6 3 4-Bed 8 Wic 38 17 -12 17 537 11 1 11 3 5-Mech 274 61 -46 61 2,277 48 3 48 4 6-Utility Closet 62 24 -18 24 836 18 1 18 3 7-Dining/Opt Study/Bed 7 174 1,817 -87 1,817 3,004 63 so 80 7 8-Foyer 94 835 -168 835 1,697 36 37 37 6 9-Pwdr 54 185 -116 185 909 19 8 19 3 10-Kitchen 457 1637 -224 1,837 1,897 40 W 81 7 11 -Great Room 318 5,183 -326 5,183 5,717 121 228 228 7,7,7 12-Nook 247 4,116 -331 4,116 4,152 88 184 181 7,7 13-Project/Opt Bed 6 179 2,194 -70 2,194 2,986 63 97 97 6,15 14-Mud Room 178 630 -301 630 2,740 so 28 58 6 15-Loft/Opt Bed 349 2,461 -46 2,461 3,337 70 108 108 7,7 16-Bath 2 65 168 -49 168 504 11 7 11 4i 17-Bedroom 3 162 1,847 -34 1,847 3,036 64 81 81 6,61 18- Bedroom 2 181 1,680 7 1,687 2,657 56 74 74 i 66! 19-Laundry 94 133 0 133 212 4 6 6 4i� 20-Bath 3 48 474 -46 474 694 15 21 21 5 21 -Bedroorn 4 157 1 R79 109 1 388 1,293 27 66 56 7 22-Wic 2 97 434 -186 434 1645 36 19 35 5 23-Master Bath 210 716 -145 716 1,813 38 32 38 6 24-Wic 1 65 168 -49 168 503 11 7 11 4 25-Master Bedroom 389 4,448 -278 4,448 6,161 130 496 196 7,7,7 Sum of room airflows may be greater than system airflow because system room airflow option uses the qreater of heating or cooling, Y,\ ,,\Standard Pacific-Fireside-Plan 5060,rhv Tuesday, February 18, 2014, 7:51 AM -- -D N ame. SR -100, Supplies: Project/Opt B 6, Fittings: 2 -1, 4 =G, Eff ective Length: 61.5 Runout 0.0003 6 245 0.004 r Up. ST -530 55 4.7 0.020 0.009 Rnd 13.1 6.6 43.4 0.012 E Presize 48 25.4 0.322 0478 -- -Duct Name: R -110, Suppl Project /Opt Bed 6, Fittings. 2 -1, 4 -G, Eff ective L +61.4 Runout 0.0003 6 245 0.004 Up. ST -230 55 4.7 0.020 0.009 Find 18.0 6.6 414 0.012 Presize 48 28.3 0.319 0.48 , --- N ame. SR -120, Suppl Pwdr, F itti ng s: 2 -1, 4-G, Eff ective Length: 28.2 Runout 0.0003 3 387 0.006 Up. ST -150 128 2.4 0.097 0.021 Find 6.0 13 22.2 0.027 f Presize 19 4.7 0.292 0,508 -- -Du N ame: SR -130, Supplies Room, Fittings. 2-1,4-G, Eff ective Length: 57.5 t Runout 0:0003 6 295 0.001 Up: S -140 128 4.7 0.025 0.013 Rnd 18 6.6 53.7 0.014 Presize 58 5.9 0.311 0.489 _e -Duct Nerve: SR -150, Supplies: Dining /Opt Study /tied 7, Fittings: 2 -1, 4 -G, Effective Length: 89.3 Runout 0.0003 7 299 0.004 Up: ST -190 55 5.4 0.023 0.017 Rnd 16.8 7.7 72.6 0.021 Presize 80 30.7 0.288 0.512 ... Duct N ame: SR -160, Supplies: Kitchen, Fittings: 2-1,4-H, Eff Length: 70.3 fi � Runout 0.0003 7 303 0.003 Up. ST -310 55 5 .4 0.024 0.014 Find 12.8 71 57.5 0.017 Presize 81 23.5 0.292 0.508 4 -A -Duct Name: R -170, Supplies: Great Room, Fitting 2-1,4-G, Effective Length: 106.2 Runout 0.0003 7 284 0.007 Up. ST -450 55 5,4 0.021 0.015 Rnd 34.4 7.7 71.7 0.022 Presize 76 63.1 0286 0.514 -- -Duct Name: SR-180, Supplies. Great Roam, Fittings: 2 -1, 4 - G, Effective Length: 100.6 Runout 0.0003 7 284 0.007 Up: ST -300 55 5.4 0.021 0.014 Rnd 34.5 7.7 66.1 0.021 Presize 76 612 0288 0.512 - -_Duct Name: SR -190, Supplie Great Room, Fittings ": 2-1,4-H, Effe Length: 81..9 Runout 0.0003 7 284 0.007 3 Up: ST -180 55 5.4 0.021 0.010 Rnd 341 7.7 47.2 0.017 Presize 76 615 0.298 0.502 Y:\ ... \Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February 18,2014, 7:51 AM ... Duct Name: SR -200, Supplies: Nook, Fittings: -1 4-G, Effective Length: the .0 Runout 0.0003 7 341 0,005 Up: ST -400 55 5,4 0.029 0.017 Rnd 13.0 7.7 57.0 0.0122 Presize 91 33 0.294 0.506 ...Duct Name: SR -210, Supplies: Nock, Fittings: 2 -1, 4•G, Effective Length: 78.9 Runcut 0,0003 7 341 13.005 Up: ST -280 55 5.4 13,029 0.013 Rnd 17.9 7.7 61.0 0.023 Presize 91 32.8 0.300 0.500 -- -Duct Name: SR -140, Supplies: Foyer, Fittings: 2 -1, -11, Effective Length: 46.2 Runaut 0.0003 6 188 0.002 Up: ST -290 55 4.7 0.012 0.004 Rnd 13.8 6.6 324 0.006 Presize 37 21,6 0311 0.489 -- -Duct Name: -510, Feeds Into: Meth, Fitting: 1 -1, Effective Length: 26.5 Trunk 0.0003 18.6 681 0.000 Up: Fan 55 25 O »036 0.009 Rect 0.9 12 25.6 0329 Pre 1,418 5.7 0.334 0.466 --- Duct Name: ST -:540, Feeds Into: Mech, Effective Length: 1.0 Trunk 0.0003 15.6 900 0.001 Up. ST -520 55 12 0.071 0.000 Rect 1.0 17 0.0 0.001 Nearest Inch 1,275 4.8 0333 0.467 -- -Duct Name: ST -:530, Feeds Into: Mech, Effective Length: 0.7 Trunk 0.0003 16.7 847 0.000 Up: SNIT -510 55 13 0,058 0.000 Rect 0.7 18 0.0 0.000 Nearest Inch 1,377 14 0.334 0.466 -- -Duct Name: ST -520, Feeds Into: Lech, Effective Length: 0.E3 Trunk 0.0003 16 886 0.001 Up: T -530 55 12 0.067 0.000 Rect 0.8 18 0.0 0,001 Nearest Inch 1,329 4.2 0334 0.466 -- -Duct Name: ST-490, Feeds Into: Rec Room, Effective Length: 44.0 Trunk 0.0003 16,9 609 0;001 Up: ST -120 55 25 0.034 0.0100 Rect 4.0 10 0.0 0.001 Presize 1,057 23,3 0,324 0.476 ... Duct Name: ST -410, Feeds Into: Lech, Effective Length: 1.4 Trunk 0.0003 18.6 588 0.000 Up: T -250 55 25 0.027 0.000 Rect 1.4 12 0.0 0.000 Presize 1,224 8.7 0331 0.469 Y:\ ... \Standard Pacific- Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM t � n &tii Nt - DotSll!m� I -,S a,( , d, -- -Duct N ame: S T-400, s� Into: R Room, Effective Length: 1.4 Trunk 0.0003 15.2 617 0:001 Up: T -290 55 20 0.038 0.000 Rect 1.4 10 0.0 0.001 Presize 557 7.1 0316 0.484 -- -Duct Name: T -390, Feeds Into: Rec Room, Effective Length: 1. Trunk 0.0003 15,2 552 0.000 Up: ST -400 55 20 0.031 0.000 Rect 1,6 10 0.0 0:000 Presize 766 7.9 0.3 0,484 -- - Name: ST -380, Feeds Into: Bedr 8, Fitting: 12-01, Eff Length: 11.8 Trunk 0.0003 152 394 0.000 U p: ST -480 55 20 0.017 0.002 Rect 2.8 10 9.1 0.002 Presize 547 118 0310 0.490 ...Duct Name: ST -370, Feeds into: Bedroom 8, Effective Length: 0.7 Trunk 0.0003 117 120 0.000 Up: ST -200 128 16 0.002 0.000 Rect 0.7 10 0.0 0.000 Presize 133 2.9 0309 0,491 -- -Duct Name: T -360, Feeds Into: B e droom 8, E ffe ctive Length: 0.8 Trunk 0.0003 13.7 329 0.000 Up: ST -460 55 16 0.014 0.000 Rect 0.8 10 0,0 0.000 Presize 366 16 0.309 0.491 M- «.Duct Name: ST -350, Feeds Into: Bedroom 8, Effective L ength: 0.3 Trunk 0.0003 13.7 359 0.000 Up: ST -320 55 16 0.016 0.000 Rect 03 10 0.0 0.000 Presize 399 1.1 0.309 0491 - -Duct Name: ST -330, Feeds Into: Rec Room, Effective Length: 2.4 Trunk 0,0003 15.2 450 0.001 Up: ST -180 55 20 0.021 0.000 Rect 24 10 0.0 0.001 Presize 625 12.1 0314 0.486 -- -Duct Name: T -320, Feeds Into: Bedroom 8, Effective Length: 0:8 Trunk 0.0003 13.7 365 0.000 Up: ST -300 55 16 0.016 0,000 Rect 0.8 10 0.0 0.000 Presize 406 16 0309 0.491 -- -Duct Name: T -310, Feeds Into: Bedroom 8, Effective Length: 1.0 Trunk 0.0003 13.7 188 0.000 Up: T -450 55 16 0.005 0.000 Rect 1.0 10 0.0 0.000 Presize 209 43 0309 0,491 `(:\ ...!Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February 18, 2014, 7 :51 AM m n ITRIVIOMMM ...Duct Name: ST -300, Feeds Into: Bedroom 8, Effective Length: 0.4 Trunk 0.0003 131 434 0.000 Up: ST -380 55 16 0.022 0.000 Rect 04 10 0.0 OMO Presize 482 1.8 0.309 0.491 -- -Duct Nerve; ST -290, Feeds into: Rec Room, Effective Length: 1.9 Trunk 0.0003 15.2 644 0.001 Up: T -170 55 20 0.041 OMO Rect 1.9 10 0.0 0.001 Presize 894 9.6 0.317 0.483 - :.Duct Name: T -280, Feeds into: Rec Room, Effective Length: 0.8 Trunk 0,0003 16.9 605 0.000 Up: ST -270 55 25 0.034 0.000 Rect 0.8 10 0.0 OMO Presize 1,051 4.9 0323 0.477 -- -Duct Name: ST -270, needs into: Rec Room, Effective Length: 1.8 Trunk 0.0003 16.9 609 0.001 Up: ST -490 55 25 0.034 0.000 Rect 1.6 10 0.0 0.001 Presize 1,057 9.2 0.323 0;477 _ --Duct Name: ST -260, Feeds into: Mech Effective Length: 1.0 Trunk 0.0003 18.6 607 0.000 Up: ST -420 55 25 0.029 OMO Rect 1,0 12 0.0 0.000 Presize 1,265 62 0.332 0.468 ...Duct Name: ST -250, Feeds into, Mach, Effective Length: 2.0 Trunk 0.0003 18.6 607 0.001 Up. ST -260 55 25 0.029 0.000 Rect 2.0 12 0.0 0.001 Presize 1,265 123 0332 0.468 -.-Duct dame: T -230, Feeds into. Mech, Effective Length: 0.8 Trunk 0.0003 18.6 562 OMO Up: ST -410 55 25 0.025 0.000 Rect 0,8 12 0.0 0.000 Presize 1,170 5.1 0.331 0.469 -- -Duct Name: ST -2217, Feeds into: Bedroom 8, Effective Length: 1.4 Trunk 0.0003 117 ; 257 OMO Up: ST -190 55 16 0.009 OMO Rect 1.4 10 0.0 07:000 Presize 286 6.1 0.309 0:491 -- -Duct Name:. ST -210, Feeds into: Bedroom 8, Fitting: 12-01, Effective Length: 11.2 Trunk 0.0003 15.2 450 0.000 Up: T -470 55 20 0.021 0.002 Rect 1.9 10 93 0.002 Presize 625 9.6 0.312 0:488 Y:\ ... \Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February 18, 2014, 7:51 Ail r .r ♦ N --Duct Name: ST -200, Feeds Irmo: Bedroom 8, Effective Length: 0.8 Trunk 0.0003 13.7 151 0.000 Up: ST -310 128 16 0.003 0.000 Rect 0.8 10 0.0 0.000 Presize 168 3,2 0309 0.491 -- -Duct Name: ST -190, Feeds Into: Bedroom 8 Effective Length: 0.3 Trunk 0.0003 117 329 0.000 Up: ST -360 55 16 0.014 0.000 Rect 03 10 0.0 0.000 Presize 366 1.1 0.309 0.491 -- -Duct Name: T -180, Feeds Into. Rec Room, Effective Length: 2.8 Trunk 0.0003 15.2 505 0,001 Up: T -390 55 20 0.026 0.000 Rect 2,8 10 0.0 0:001 Presize 701 13.8 0315 0.485 «- -Duct Name: ST -170, Feeds Into: Rec Room, Effective Length: 3;1 Trunk 0.0003 152 659 0.001 Up: ST -150 55 20 0.043 0.000 Rect 3.1 10 0.0 0.001 Presize 915 15.4 0,317 0.483 -- -Duct Name: T -150, Feeds Into: Rec Room, Fitting: 12 -41, Effective Length: 15.6 Trunk 0.0003 16.9 532 0,001 Up: ST -280 55 25 0.027 0.003 Rect 5.1 10 10.5 0.004 Presize 923 29.7 0319 0.481 --.Duct Name: ST -140, Feeds Into: Rec Room, Fitting: 12 -01, Effective Length: 14.1 Trunk 0,0003 16.9 646 0,001 Up: ST -230 55 25 0.038 0,004 Rect 33 10 10.9 0.005 Presize 1,122 19 0326 0.474 -a -Duct Name. ST -120, Feeds Into: Rec Room, Effective Length: 1.3 Trunk 0.0003 16.9 630 0.000 Up. ST -140 55 25 0,036 0.000 Rect 13 10 0.0 0.000 Presize 1,094 7.3 0325 0.475 -- -Duct Name: ST -420, Feeds Into: Mech, Effective Length: 0.6 Trunk 0.0003 15.6 898 0:000 Up: ST -540 55 12 0,071 0.000 Rect 0.6 17 0.0 0;000 Nearest Inch 1,272 2.8 0,332 0.468 -- -Duct Name: R -380, Supplies: Rec Room, Fittings: 2 -1, 4 -AD, Effective Length: 77.8 Runout 0.0003 6 341 0.011 Up: ST-210 128 4.7 0.032 0.014 Rnd 32.9 6.6 44.9 0.025 Presize 67 51.7 0287 0.513 Y.\ ... \Standard Pacific- Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM -- -Duct Name- SR -390, Supplies: Rec Room, Fittings. 2-1,4-AD, Effective Length: 65.3 0.0003 Runtout 0.0003 6 341 0.004 Up: T -370 128 4.7 0.032 0.017 Rnd 13.:3 6.6 52.0 0.021 Presize 67 20.8 0288 0.512 --- Duct Name: SR -400, Supplies: Bedroom 8, Fittings. 2 -1, 4 -AD, Effective Length: 35.0 0.000 Runout 0.0003 5 160 0.000 Up: ST -430 128 3.9 0.012 0.004 Rnd 17 5.5 32.3 0.004 Presize 23 4.8 0.304 0.496 Runout 0.0003 3 224 Up: ST -220 128 2.4 0.037 Rnd 12.3 3.3 22.6 Presize 11 93 0.296 Runout 0.0003 3 367 Up: T -350 128 24 0.088 Rnd 12.4 13 20.4 Presize 18 9.8 0280 t i1 1 0.011 0.018 0.029 0.520 ___Duct Name: ST-430, Feeds Into: Bedroom 8, Effective Length: 0.6 Trunk 0.0003 13.7 78 0:000 Up: ST -370 55 16 0.001 0,000 Rect 0.5 10 0.0 0:000 Presize 87 2.2 0.309 0.491 -- -Duct Name: ST -440, Feeds Into: Bedroom 8, Effective Length: 0.3 Trunk 0.0003 117 59 0.000 Up 55 16 0.001 0.000 Rect 03 10 0.0 0.000 Presize 65 1.4 0.309 0.491 -- -Duct Name: ST -450, Feeds Into. Bedroom 8, Effective Length: 1.1 Trunk 0.0003 13.7 257 0.000 Up. ST -220 55 16 0.009 0.000 Rect 1.1 10 0.0 0.000 Presize 285 41 0309 0.491 -- -Duct Name: ST -460; Feeds Into: Bedroom 8, Effective Length. 1.0 Trunk 0.0003 13.7 358 0.000 Up: ST -350 55 16 0.016 0 000 Rect 1.0 10 0.0 0.000 Presize 398 43 0.309 0.491 ...Duct Name. ST -470, Feeds Into: Rec Room, Effective Length. 0.5 Trunk 0.0003 15.2 450 0.000 Up: T -330 55 20 0.021 0.000 Rect 0.5 10 0.0 0.000 Presize 625 2.5 0.314 0.486 Y:1 ...\Standard Pacific - Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7 :51 AM --- Duct Name: ST-480, Feeds Into: Bedroom 8, Effective Length: 1.6 Trunk 0.0003 152 434 0.000 Up: ST -210 55 20 0,020 0.000 Rect 1.6 10 0.0 0,000 Presize 603 7.9 0.312 0,488 _. -Duct Name: SR-370, Supplies: Mech, Effective Length: 0.1 Runout 0.0003 4 550 0.000 Up: ST-540 128 3.1 0.125 0.000 Rnd 0.1 44 0.0 0,000 Nearest Inch 48 0.1 0.333 0.467 --- Duct Name: SR-430, Supplies: Bath 6, Fittings: 2-1, 4-AD, Effective Length: 18.3 Runout 0.0003 3 122 0.001 Up: ST-330 128 2.4 0.013 0,002 Rnd 43 33 14.0 0.002 Presize 6 3.4 0.312 0488 .. -Duct Name: SR-220, Supplies: Loft /Opt Bed 5, Fittings: 2-1, 4-G, 12-S, 12-S, Effective Length: 110.0 Runout 0.0003 7 202 0.004 Up: ST-410 55 5.4 0.012 0,009 Rnd 35.3 7,7 74.8 0V3 Presize 54 64.6 0.318 0.482 . -.Duct Name: SR-230, Supplies: Loft /Opt Bed 5, Fittings: 2-1, 4-G, 12-S, 12-S, Effective Length: 106.5 Runout 0.0003 7 202 0.004 Up: ST-520 55 5.4 0.012 0,008 Rnd 35.3 7.7 71.3 0,012 Presize 54 64,6 0.321 0,479 ---Duct Name: SR-240, Supplies: Bath 2, Fittings: 2-1,4-G, 8-A2, 8-A2, Effective Length: 51.1 Runout 0,0003 4 126 0,002 Up ST-420 128 3.1 0,010 0.003 Rnd 20.6 4.4 30,5 0.005 Presize 11 21.6 0.328 0.472 --Duct Name: SR-250, Supplies: Bedroom 3, Fittings: 2-1,4-G, 12-S, 12-S, Effective Length: $9.6 Runout 0.0003 6 209 0.004 Up: ST-250 55 4.7 0.015 0.010 Find 24.8 6.6 64.8 0,013 Presize 41 38.9 0.318 0.482 --Duct Name: SR-260, Supplies: Bedroom 2, Fittings: 2-1, 4- G,12 -S, 12-S, Effective Length: 88.8 Runout 0,0003 6 188 0.004 1 Up* ST-280 55 4,7 0.012 0.008 Rnd 28.2 6.6 60.6 0.011 1 Presize 37 44.2 0.312 0.488 -- -Duct Name: SR-270, Supplies: Bath 3, Fittings: 2-1, 4-G, 8-A2, 8-A2, Effective Length: 68.2 Runout 0.0003 5 154 0.003 Up: ST -170 55 3,9 0.011 0.005 1 Rnd 24.8 5.5 43.4 0.008 Presize 21 32.5 0.310 0,490 Y:\ ...\Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February 18, 2014, 7 AM -- -Duct Name: SR -280, Supplies: Bedroom 4, Fittings. 2-1,4-G, 12-S, 12-S, Effective Length. 96.9 Runout 0.0003 7 210 0.003 Up. ST -480 55 5.4 0.012 0.009 Rnd 25,0 7.7 71.9 0.012 Presize 56 45.8 0.300 0.500 ...Duct Name: SR -290, Supplies: Laundry, Fittings. 2 -1, 4 -G, -A2, 8-A2, Effective Length: 42.4 Runout 0.0003 4 69 0.001 Up: ST -270 55 3.1 0.004 0,001 Find 15.5 4.4 26.9 0.002 Presize 6 16.2 0,322 0,478 --Duct Name: S -300, Supplies: Wic 1, Fittings. 2 -1, -, 8 -A, 8•A2, Effective Length, 57.4 Runout 0.0003 4 126 0.002 Up: ST -320 128 3.1 0.010 0.003 Find 23.6 4.4 33.8 0.005 Presize 11 241 0.304 0.496 -- -Duct Name: SR -310, Supplies: Blaster Bath, Fittings: 2 -1, 4 -G, 12 -S, 12-S, Effective Length; 79.2 I Runout 0.0003 6 194 0;002 Up: ST -460 128 4.7 0.012 0.008 Rnd 15.0 6,6 64.2 0.009 Presize 3 8 216 0300 0.500 -- -Duct Name: SR -320, Supplies: Wic 2, Fittings: 21, 4 -G, 8-A2, 8-A2, Effective Length: 71.6 Runout 0.0003 5 257 0.004 Up: T -200 128 3.9 0.024 0.014 1 Rnd 143 5.5 573 0.017 Presize 35 18.8 0.291 0.509 -- -Duct Name; SR -330, Supplies: Master Bedroom, Fittings: 2 -1, 4 -H, 12- S,12 -S, Effective Length: 109.7 I Runout 0.0003 7 243 0.006 Up: T -390 55 5.4 0,016 0.011 Rnd 38.8 7.7 71.0 0.018 Presize 65 71 0.298 0.502 -- -Duct Nacre: SR -340, Supplies: Blaster Bedroom Fittings: 2 -1, 4- G,12- S,12 -S, Effective Length: 119.2 !! 2 Runout 0.0003 7 243 0.007 Up: ST -380 55 5.4 0.016 0.012 € Rnd 44.6 7.7 74.6 0.019 Presize 65 81.7 0.290 0.510 --- Duct Name: SR -350, Supplies. Master Bedroom, Fittings: 2 -1, 4 -G, 12- S,12 -S, Effective Length: 113.8 Runout 0.0003 7 243 0.006 Up: ST -440 55 5.4 0.016 0.012 Rnd 39.3 7.7 74.6 0.018 Presize 65 71.9 0,.290 0.510 - -.Duct Name: SR-360, Supplies: Bedroom 3, Fittings. 2-1,4-G, 12-S, 12-S, Effective Length: 83.7 Runout 0,0003 6 209 0.004 Up. SKIT -510 55 4.7 0.015 0.009 Rnd 24.7 6,6 59.0 0.013 Presize 41 38.7 0.322 0.478 YA ..,\Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February 18, 2014 7:51 AM --- Duct Name: SR-440, au plies: Bedroom 2, Fittings: 2-1,4-G, 1 - 12-S, Effective Length: 85.7" Runout 0.0003 6 188 0.003 Up: ST -120 55 41 0.012 0.007 Find 27.9 6.6 57.8 0.011 Presie 37 419 0.314 0.486 Report Units: Pressure: in.wg, Duct lengths: feet, Duct sizes: inch, Airflow: CFM, Velocity: ft,/min, Temperature: F Notes: Static pressure available values for return ducts are at the entrance of the duct. For supply, they are at the exit. The cumulative static pressure loss value for a return trunk is with respect to the entry point of the return runout upstream with the highest static pressure available. Total and cumulative static pressure loss values for the supply main trunk include any device pressure losses entered, and the cumulative may also include the total static pressure loss of the return side. Dumber of active trunks: 38 Number of active runouts: 35 Total runout outlet airflow. 1,658 Main trunk airflow. 1,418 Largest trunk diameter. 18.6 MT -510 Largest runout diameter. 7 SR -150 Smallest trunk diameter. 117 ST -370 Smallest runout diameter. 3 SR -120 Supply fan external stage pressure. 0.800 Supply fan device pressure lasses. 0.320 Supply fan static pressure available. 0x480 Runout maximum cumulative static pressure loss. 0,520 SR -420 Return loss added to supply. 0.136 Total effective length of return ( ft.). 493.1 High, low Total effective length of supply ( ft.): 144.9 SR -420 Overall total effective length (ft.): 638.0 High, lows to SR -420 Design overall friction rate per 100 ft.: 0.075 (Available SP x 1001 TEL) System duct surface area (Scenario 1): 1449.5 Main (linked to duct load) System duct surface area (Scenario 3); 38.9 garage (linked to duct load) Total system duct surface area: 14883 Tuesday, February 18, 2014, 7:51 AM IfigI ..Duct Name: High, Low, Returns From: Kitchen, Fittings: 6-B, 6-F, 6-F, Effective Length: 285.6 Runout 0.0003 16.9 450 0.002 Up: RT-160 75 25 0.019 0,053 Rect 8.9 10 2763 0.055 Presize 781 51, 5 0.000 0,055 --- Duct Name: RT-170, Feeds From: Rec Room, Effective Length: 0.3 Trunk 0,0003 18.6 375 0.000 Up: RT-130 75 25 0.012 0.000 Rect O.3 12 0.0 0.000 Presize 781 1.5 4059 0,127 ---Duct Name: RT-130, Feeds From: Rec Room, Fitting: 12-Fl, Effective Length: 26.4 Trunk 0.0003 18,6 490 0.000 Up: RT-1 10 75 25 0.019 0.005 Rect 1.5 12 24,9 0.005 Presize 1,021 9,2 -0.059 0.127 ..Duct Name: RMT-100, Feeds From: Mech, Fittings: 5-K, 5-N, Effective Length: 146.7 Trunk 0.0003 10.6 796 0.000 Up: Fan 75 25 0.046 0.067 Rect 0.7 12 146.0 0;068 Presize 1,658 41 -0.069 0A36 --Duct Name: RT-1 10, Feeds From: Mach, Effective Length: 8.8 Trunk 0.0003 18.6 796 0,004 Up: RMT-100 75 25 0.046 0.000 Rect 8.8 12 0.0 0.004 Presize 1,658 54.5 -0.064 0.132 -- -Duct Name: RT-160, Feeds From: Bedroom 8, Effective Length: 25.4 Trunk 0.0003 16,9 450 0,005 Up: RT- 170 75 25 0,019 0.000 Rect 25,4 10 0.0 0.005 Presize 781 1483 -0,055 0.122 -- -Duct Name: Low, Returns From: Rec Room, Fittings: 6-C, 6-G, Effective Length: 44.9 Runout 0.0003 8 688 0.007 Up: RT-130 75 62 0,084 0.031 Rnd 8.3 83 36.6 0.038 Presize 240 17.3 -0,022 0:038 .D ct Name: RT-120, Feeds From: Bedroom 3, Effective Length: 21.0 Trunk 0.0003 15.2 459 0.005 Up: RT-1 10 75 20 0.022 0.000 Rect 21:0 10 0.0 0.005 Presize 637 105 -0.060 0,041 -- -Duct Name: RT-140, Feeds From: Loft /Opt Bed 5, Fitting: 8-B1C, Effective Length: 24.1 Trunk 0,0003 15.2 459 0.001 Up: RT-120 75 20 0.022 0.004 Rect 4.8 10 19.3 0.005 Presize 637 24.2 -0.055 0.036 ---- - ------- Y:\...\Standard Pacific-Fireside-Plan 5060,rhv Tuesday, February 18,2014, 7:51 AM --- Duct Name: Mstr Ceiling, Returns From: Master Bedroom, Fittings: 6-C, 6-L, Effective Length: 198.5 1,658 Runout 0.0003 12 355 0.003 Up: RT- 150 75 9.3 0.016 0.028 Rnd 19.3 13.1 179,2 0.031 Presize 279 60.5 -0.024 0,031 --- Duct Name: Hall Ceiling, Returns From: Loft/Opt Bed 5, Fittings: 6-C, 6-L, Effective Length: 116.6 Total effective length of return ( ft.): Runout 0.0003 14 335 0.001 Up: RT-140 75 10.8 0.012 0.013 Rnd 5.5 15.3 111,1 0,013 Presize 358 20,2 -0.041 0.013 -- -Duct Name: RT-150, Feeds From: Laundry, Effective Length 4.2 Trunk 0.0003 15,2 201 0.000 Up: RT-140 75 20 0.005 0.000 Rect 4.2 10 0.0 0.000 Presize 279 20.8 -0.055 0.035 4 Total runout outlet airflow: 1,658 Main trunk airflow: 1,658 Largest trunk diameter: 18.6 EST -170 Largest runout diameter'. 16.9 High, Low Smallest trunk diameter: 15.2 RT-120 Smallest runout diameter. 8 LOW Runout maximum cumulative static pressure loss: 0.055 High, Low Return loss added to supply: 0.136 Total effective length of return ( ft.): 493,1 High, Low Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturers performance data at your design conditions. ------------ Y:\.,.\Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM iry Loads Atrium: Glazing- 561 12,001 0 16,027 16,027 Standard Front Door: Door- 24 267 0 85 85 Standard Garage Door: Door- 17.8 442 0 141 141 R15 Framed-8,75: Wall- 1205 4,166 0 54 54 R15 Framed-8: Wall- 111.5 381 0 4 4 Draped R11 -8,75: Wall- 636.6 2,310 0 31 31 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud 3358.6 15,063 0 2,468 2,468 cavity, no board insulation, siding finish, wood studs 1613-38: Roof/Ceiling-Under Attic with Insulation on Attic 1840.7 3,303 0 2,203 2,203 Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-38 insulation 21 A-32: Floor-Basement, Concrete stab, any thickness, 2 1706.4 2,355 0 0 0 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor stab is 32' wide 20P-30: Floor-Over open crawl space or garage, Passive, 387.5 935 0 82 82 R -30 blanket insulation any cover Subtotals for structure 41,223 0 21,095 21,095 People: 9 1,800 2,070 3,870 Equipment: 0 2,100 2,100 Lighting: 0 0 0 Ductwork: 2,616 -549 1,821 1,272 Infiltration: Winter CFM: 202, Summer CFM: 191 12,528 -4,151 2,750 -1,401 Ventilation: Winter CFM: 0, Summer CFM 0 0 0 0 0 Humidification (Winter) 15.56 gal/day: 5,708 0 0 0 AED Excursion: 0 0 2,383 2,383 Total Building Load Totals: 62,074 -2,900 32,219 29,319 Total Building Supply CFM: 1,420 CFM Per Square ft.: 0.272 Square ft. of Room Area 5,225 Square ft. Per Ton: 2,139 Volume (ft of Cond. Space: 52,041 Total Heating Required Including Ventilation Air: 62,074 Btuh 62.074 MBH Total Sensible Gain: 32,219 Btuh 100 % Total Latent Gain: -2,900 Btuh 0 % Total Cooling Required Including Ventilation Air: 32,219 Btuh 2.68 Tons (Based On Sensible + Latent) Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary, Be sure to select a unit that meets both sensible and latent loads according to the manufacturers performance data at your design conditions. Y. ... \Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February, 18, 2014 7:51 AM Standard Front Door: Door- 24 267 0 85 85 Standard Garage Door: Door_ 17.8 442 0 141 141 R15 Framed- 8.75: Wall- 1205 4,166 0 54 54 R15 Framed -8: Wall- 111.5 381 0 4 4 Draped R11 -8.75: Wall 638.6 2,310 0 31 31 12F -Osw: Wall - Frame, R -21 insulation in 2 x 6 stud 3358.6 15,063 0 2,468 2,468 cavity, no beard insulation, siding finish, wood studs 165 -38: Roof /Ceiling -Under Attic with Insulation on Attic 18401 3,303 0 2,203 2,203 j Floor (also use for Knee Walls and Partition # Ceilings), Vented Attic, No Radiant Barrier, Dark i Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R -8 insulation 21 A -32: Floor - Basement, Concrete slab, any thickness, 2 17064 2,355 0 0 0 or more feet below grade, no insulation below floor, any floor cover, Shortest side of floor slab is 32' wide 20P -30: Floor -{fiver open crawl space or garage, Passive, 387.5 935 0 82 82 R -0 blanket insulation, any cover Subtotals for structure: 41,223 0 21,095 21,095 People: 9 1,800 2,070 3,870 4 Equipment: 0 2 „100 2,100 Lighting: 0 0 0 Ductwork. 2,6116 -549 1,821 1,272 E Infiltration. Winter CFM: 202, .Summer CFM: 191 12,528 - 4,151 2,750 - 1;401 Ventilation. Winter CFM: 0, Summer CFM. 0 0 0 0 0 Humidification (Winter) 15.56 gal /day : 5,708 0 0 0 AED Excursion: 11 0 0 2,383 2,383 € System 1 System 1 Load Totals. 62,074 - 2,900 32,219 29,319 I Supply CFM. 1,420 CFM Per Square ft.: 0.272 Square ft. of Room Area Square ft. Per Ton Volume (W) of Cond. Space. 52,041 a Manual and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed building Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. R Pacific 56 _ February i 2014, A Total Sensible Gain: 32,219 Btuh 100 % Total Gain: Total Coolinq Reauired Includinq Ventilation Air: 32,219 Btuh 2.68 Tons (Based On Sensible + Latent) a Manual and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed building Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. R Pacific 56 _ February i 2014, A Cooling System Type: Standard Air Conditioner Outdoor Model; CAI3NA0 2 "'(A,B Indoor Model: CNPV *4821AL * +TCR Tradena e: CARRIER AIR CONDITIONING Outdoor Manufacturer; CARRIER AID CONDITIONING ARI Deference No.: 6395921 Nominal Capacity: 41500 Efficiency: 13.2 SEER i Heating System Type; Natural Gas Furnace Model: 59SC2R1(}t1S21 - -22 Traden rne: Carrier Manufacturer; CARRIER CORPORATION Description: Natural Gas or Propane Furnace Capacity: 93000 Efficiency: E l Z 92.1 AFUE i 1 t I r f 3 s l r i Y:\ ...\Standard Pacific - Fireside -Plan 5060.rhv Tuesday, February 18, 2014,7:51 AM Calculation Mode: Htg. & clg.. Occurrences: 1 Room Length: 1,106.5 ft. System Number: 1 15 Roam Width: 1.0 fit. Zone Number: 1 Area: 1,107.0 sq.ft. Supply Air: 135 CFM Ceiling Height: 93 ft. Supply Air Changes: 0.8 AC/hr Volume: 10,739.0 cu.ft. Reel: Vent. Cl 0 CFM Number of Registers: 2 Actual Winter Vent.: 0 CFM x 0.047 1 1,069 Percent of Supply.: 0 % 9.8 Actual Summer Vent.: 0 CFM E - Wall -R15 Framed -8.75 8.4 X 9.8 Percent of Supply: 0 % 289 0.1 0 Actual Winter Infil.: 5 CFM 0.047 3,5 106 Actual Summer lnfil.: 5 CFM 3 x 9.8 i S - Wall -R15 Framed -3.75 16.5 X 130.9 0.047 15 567 0.1 0 9 9.8 W - Wall -R15 Framed -8.75 192 X 170.9 0.047 3.3 562 0.0 0 2 9.3 N - Wall -R15 Framed -8.75 33.9 X 314.7 0.047 1 1,069 0.0 0 10 9.8 E - Wall -R15 Framed -8.75 8.4 X 9.8 82.1 0.047 3.5 289 0.1 0 5 S - Wall -R15 Framed -8.75 3.1 X 9.8 30 0.047 3,5 106 0.1 0 2 E - Wall -R1 Framed -8.75 9.8 X 9.8 35.8 0.047 3.5 338 0.1 0 6 W -GIs- Atrium shgc -0.33 0 %S 16 0310 21.4 342 36.2 0 579 f N -GIs- Atrium shgc -0.33 100%S 16 0.310 21.4 342 114 0 182 l Floor-21A-32 1 X 1106.5 1106.5 0.020 14 1,527 0.0 0 0 Subtotals for Structure. 5 „772 0 805 Infil.: Win.: 5.2, Sum.: 4.9 107 1042 324 0.667 -107 71 Ductwork: 297 57 AED Excursion: __ ....................... ... ........ 7 5 i Room 'totals. 6,393 -107 1,007 1 Y:\ ...\Standard Pacific -Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM Room Length 110 ft. System Number: ' 1 Room Width: 13.1 ft. Zone Number :. 1 Area: 170.0 sq.ft. Supply Air: 23 CFM Ceiling Height: 9,8 ft. Supply Air Changes: 0,8 AC/hr , Volume: 1,658.0 cu.ft. Req.. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter lnfil.: 1 CFM Actual Summer lnfil., 1 CFM I N -Wall-RI 5 Framed -8 13.1 X 9.8 111.5 0.047 34 381 0:0 0 4 N -GIs-Atrium shgc -0.33 100 °IBS 16 0310 21.4 342 11.4 0 182 Floor-21A-32 1 X 170,1 170.1 0.020 1.4 235 0.0 0 0 f Subtotals for Structure: 958 0 186 lnfil.: Wirt. :1.1, Sum. :1.1 23 1049 70 0.653 -23 1 Ductwork: 50 28 AEA? Excursion: 37 People: 200 latlp r, 230 senlper: 1 200 230 Room Totals: 1,078 177 496 7 :1 ... \Standard Pacific - Fireside -Plan 5060.rhv Tuesday, February 18, 2014„ 7 :51 AM i 1 1� u 1 Calculation Made: Htg. & clg. Occurrences. 1 Room Length: 551 ft. Room Width: 1.4 ft. System Number: Zone Number 1 1 t Area: 55.4 s -ft. Supply Air: 6 CFM # Ceiling Height: 9.8 ft. Supply Air Changes: 43 AC /hr i Volume: 543.4 cu,ft: Req. Vent. Clg: 4 CFM Dumber of Registers: 1 Actual Winter Vent.: 4 CFM Percent of Supply.: 4 % Actual Summer Vent.. 4 CFM Percent of Supply: 4 % Actual Winter Infil.. 4 CFM Actual Summer Infil.. 4 CFM { } S - Wall -R15 Framed -8.75 5.3 X 9.8 51.6 4.447 3.5 182 4.1 4 3 F Floor-21A-32 1 X 55.7 55.7 4.424 1.4 77 4.4 4 4 Subtotals for Structure: 259 4 i Infil,. Win.. 4.3, Sum.. 4.2 5 3.142 16 4.582 -5 Ductwork. 13 4 AED Excursion: 1 Room "Totals: i } E _ 288 _ 7 r s f E r 3 i 1 3 t � 111 1 I Y:\ ... \Standard Pacific - Fireside -Plan 5464.rhv "Tuesday, February 18, 2414, 7 :51 AM Y:\ ,.\Standard Pacific- Fireside -Flan 5060.rhv Tuesday, February 18, 2014, 7. AM pp L W1. in Calculation Mode: Htg. & c1g. Occurrences: Room Length: 6.5 ft. System Number: Room Width: 5,8 ft. Zone Number: Area: 38.0 sqJt. Supply Air: 11 CFM Ceiling Height: 9.8 ft. Supply Air Changes: 1.8 AC/hr Volume: 369.0 cu.ft, Req. Vent. Cig: 0 CFM Number of Registers: I Actual Winter Vent.: Percent of Supply.: 0 CFM 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 1 CFM f Actual Summer Infil.: I CFM N WWalIFR15 Fr�amed-8.75 56:6 0;047 3. �200 0 E -Wall-R15 Framed-8,75 6.5 X 9,8 614 0,047 15 223 0.1 0 4 Floor-21 A-32 1 X 37.9 37.9 0.020 1.4 52 0.0 0 Subtotals for Structure. 475 0 7 Infil.: Win.: 0.6, Sum.: 0.6 12 3.078 37 0.665 -12 8 Ductwork: 25 1 AFC? Excursion: ..... . . ...... .. .. ...... ..... . . . . ... . ............. ......... .. . ................ ............ ...... ... ....... ...... . ............... 1 Room Totals: 537 412 3 7 qg i L ------- - ---- ----- ---- Y:\ ,.\Standard Pacific- Fireside -Flan 5060.rhv Tuesday, February 18, 2014, 7. AM : . .zaw ..a :� © :a> \,=y «�}< ��� ©.:a y.a4 ^ � ? 2� : w � %�\ « e :§ »f §>\%�� # #2 > \ #7 #2� «� .» < *§#7y f °� 2f� 2 *� /�. ./� », «� ;< _ «, #w� ® <x f �..��. �.: .�.� «�� -,�: :�. : « . <�� w 4! « «, ,« «: � if »E �_ �© �. :.,� . -■ < ^ ..z �.,.. ,.. \� »\ «,c■ «: f��2. »!^ ,:.> © <� � f . a. « z . ° © ,° ■ < • ©% :� \.! /. , w «, 2 <\ / © a ., ! : « '!� : «� :4� , a � ©� , ,« «, °© < a � z »r� #«w >w *: #�*�< �� f� ;t� «•° a »- ,<. ■ \: \ -- �! »� � ? , c, , , : : ■ _,� <� ;.; « 2 • �»; »,� ,� � �� d ; <� � , » »« ■�,l,f *«<., <!; »» „- <« <4 ■« , :, »,�<:�2�z <7< <,< ,«, • <4 ,■ « # » °iw :4�» :w . < <. , .: . .. w� ��! � - ,:4 w � ..� < ,, : w ■ ?» :� < ! „�<�,: � d �� :. r x ,n r Loy r; 4 ........: .,.,._ w.:. .. -____. .__,.....,_..�.. .....�...�, ._.., .. _o- .: Calculation Mode. Htg. & clg. Occurrences: Room Length: 62.O ft. System Number: 1 Room Width. 1.0 fit. Zone Number:. 1 Area: 62.0 sq.ft. Supply Air: 18 CFM Ceiling Height: 9,8 fit. Supply Air Changes. 1.8 AC/hr Volume. 604.0 cu.ft. req. Vent. l: 0 CFM Number of registers: 1 Actual Winter Vent.; 0 CFM Percent of Supply.. 0 % Actual Summer Vent.: 0 CFM Percent of Supply. 0 % Actual Winter Infil.. 1 CFM Actual Summer Infil.: 1 CFM l - Wall - Draped r11- 8.75 6.6 X 9.8 63:9 0.051 3.6 231 0.0 0 3 # -Wall- Draped r11 -8.75 2 X 9,8 19.5 0.051 ' 16 71 0.0 0 1 - Wall - Draped r11 -8,75 6.2 X 9.8 60.4 0.051 3.6 219 0,0 0 3 { -Wall- .gaped F111- 8.753.8 X 9.8 37.3 0.051 16 135 0:0 0 2 I Floor-21 A-32 1 X 62 62 ., _.,..._. 020 ..r . .. -._ _.__, ,_ _ �_. ..__.. ?... �.....��?�. __. ..�..... I Subtotals for Structure. 742 0 9 Infil.. Win.: 0.9, Sum.. 0.8 18 3.036 55 0.662 -18 1 i Ductwork. 39 1 AFD Excursion. Room Totals: 836 18 24 l t i i i s f I x i ............._.., ._,.,,, .»., ..e ». e.,., ......,..:.,.,....,.... .mow. ., _, .,....e.,.,....,,e....,.r.. :,.. ... .»,..a.. . „.. Y.\ ...\Standard Pacific - Fireside -Plan 5060.rhv .,,.....,..,. ,..........,...... ._.. .«,.....,..e ., a. ._,,,... ,......,..,... »,. ......,e. .. «.,..m Tuesday, February 18, ,.........,,.,,.., 2014, 7:51 i I i F .....„..,....:..,_..,:..,.� AM uaicuwion mope: i•i1q. & c1g. v(;QU(IUii{:CS: i Room Length: 174.3 ft. System Number: 1 Room Width: 1.0 fit. Zone Number: 1 Area: 174.0 sq.ft. Supply Air: 80 CFM Ceiling Height: 10.0 ft. Supply Air Change: 2.8 AC /hr Volume: 1,743.0 cu.ft. Req. Vent. Ci : 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM t Percent of Supply: 0 % Actual Winter Infil.: 14 CF Actual Summer Infil.: ; 13 CFM c N - Wall- 12F -0sw 13.7 X 10 116.7 0.065 4 «5 523 0 +7 0 f 86 E - Wall- 12F -Osw 12.8 X 10 107.5 0.065 4.5 482 0.7 0 79 I S -Wall - 12F -Osw 2.1 X 10 20.9 0.065 4.5 94 01 0 15 N -GIs-Atrium shgc -0.33 100 %S 10 0 310 21.4 214 11.4 0 114 i N - GIs - Atrium shgc -0.33 100 %S 10 0310 21.4 214 11.4 0 114 [ E -GIs-Atrium hgc -0.3 O %S 20 0.310 21.4 428 36.2 0 723 U P-Ceil- 1613-38 24.4 X 1 24.4 0.026 1.8 44 1,2 0 2 Subtotals for Structure: 1,999 0 1,160 Infil.: Win.: 14.0, Sum.: 13.2 285 3.038 866 0.666 -287 190 Ductwork: 139 103 3 AED Excursion: 134 I People: 200 lat/per, 230 sen /per: 1 200 230 Roam Totals: 3,004 -87 1,817 j 1 i i i i (.ft ...\Standard Pacific - Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM Room length: 917 ft= System Number: 1 } Room Width: 1.0 ft. Zone Number: 1 ! Area: 94.0 sq.% Supply Air: 37 CFM Ceiling height: 11.0 ft. Supply Air Changes: 2.1 AC/hr } Volume: 1,031.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.; 0 CFM Percent of Supply: 0 % Actual Winter lnfil.: 8 CFM k Actual Summer lnfil.: 8 CFM 3 i } ! E - Wall- 12F -Osw 6.5 X 11 35.5 0.065 4.5 159 0.7 0 26 S - Wall- 12F -Osw 8.7 X 11 95.4 0.065 4.5 428 0.7 0 70 E - Moor - Standard Front boor 3 X 8 24 0.161 11.1 267 3,5 0 85 E - tats - Atrium 12 0.31.6... 21 4 257 434._ . Subtotals for Structure: _ . n.. w_ ..... _ ._.__.._ ...,., ___.., 1,111 ._ �....__�_ .0 ,._ 0 615 lnfil.: Win.: 8.2, Sum.: 7.7 167 1038 507 0.665 -168 111 I [ductwork: 79 47 I I AEI Excursion: 62 Room Totals: s I I I } f 1,697 168 835 i 1 i } s 1 { Y-.\ ...\Standard Pacific - Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM I IS Room.: pads Room 9 'w r loa room, I Calculation Mode. Ht g. & c1g. Occurrences. F 1 Room Length. 518 ft. System Number. 1 Room Width. 1.0 ft. Zone Number. Area. 54.0 sq.ft. Supply Air. 19 CFM Ceiling Height: 10.0 f1. Supply Air Changes. 2.1 AC/hr } Volume. 538.0 cu.ft. Req. Vent, CIg. 0 CFM k Number of Registers. 1 Actual Winter Vent.. 0 CFM Percent of Supply.: 0 % } Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 6 CFM ( F Actual Summer Infil.: 5 CFM f E - Wall- 12F -0sw 8.5 X 10 85 0.065 4.5 381 01 i 0 62 S - Wall- 1F -0sw 3 X 10 86.3 0.065 4.5 136 0.7 0 22 { Subtotals for Structure: 517 0 84 Infil.: Win.: 5.6, Sum.: 5.3 115 3.036 350 0.668 -116 77 i Ductwork: 42 10 1 AED Excursion: y Room Totals: i 909 -116 185 i i a i I j 1 Y:\...\Standard Pacific - Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7 :51 AM Room Length: 457,0 ft. System Number: 1 I Room Width: 1.0 ft. Zone Number: 1 Area: 457.0 sq.ft: Supply Air: 81 CFM Ceiling Height: 10.0 ft. Supply Air Changes: 1.1 AC/hr Volume: 4,570.0 cu,ft. Req. Vent. Clg: 0 CF I Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 11 CFM Actual Summer Infil.: 10 CFM N - Wall- 12F -Osw 22.2 X 10 214.5 0.065 4,5 952 0.7 0 158 N -Cls- Atrium shgc -0.33 100 %S 8 0.310 21.4 171 4 111111 0 91 Subtotals for Structure: 1,133 0 249 Infil.: Win.: 10.9, Sum.: 10.3 223 3.038 676 0.665 -224 148 4 Ductwork: 88 104 AED Excursion 136 Equipment : ... ..,__ ., ..... .. ........ .. .. . _..., „. ,...., .. .., ,. .. , _....,.. , . ., ..... .. _ .. , ....... _... �. .. ...__.. _. ...,_ , ....... ... .... ... �........�.. � ,._ .O 1, 00 .. Roam Totals: 1,897 -224 1,837 $ s i i i l i i Y:1... \Standard Pacific - Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 19.3 ft. System Number: 1 Room Width: 16.5 ft. Zone Number: 1 Area: 313.3 s.ft. Supply Air. 228 CFM Ceiling Height. 10,0 ft. Supply Air Changes: 43 AG/hr Volume: 3,176.0 cu.ft. Req. Vent. Gig: 0 CFM Number of Registers: 3 Actual Winter Vent,: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM 1 Percent of Supply: 0 % Actual Winter Infil.: 26 CFM Actual Summer Infil.: 24 CFM l W - Wall- 12F -0s 19.2 X 10 132.5 0.066... 4.5 594 0:7 O 97 { N - Wall- 12F -Osw 16.5 X 10 165 0.065 4.5 740 0.7 0 121 S -Wall-1 2F-Osw 16.5 X 10 135 0.065 4.5 605 0.7 0 99 W -GIs-Atrium shgc -0.33 O %S 15 0310 21.4 321 36.1 0 542 ` W - Is- Atrium shg -0.33 O%S 15 0.310 21 A 321 36.1 0 542 W -GIs-Atrium hgc -0.33 O %S 30 0.310 21.4 642 362 0 1,085 S -GIs-Atrium shgc -0.33 O %S 15 0.310 21 A 321 18.1 0 271 -GIs-Atrium shgc 0 3 C2 °IBS ...:w:.. _ 15 0.310 _. . .. .. .. 321 _ ... e _.1 . ... , _._ ......_�. �. _271 I Subtotals for Structure: 3,865 0 3,028 , Infil.: Win.: 25.6, Sum.: 24.2 523 3.037 1,587 0.668 -526 349 Ductwork: 265 293 ; AEC\ Excursion: 383 i People: 200 tat/per, 230 senlper: 1 200 230 Equipment: _ O 900 Roam Totals: 5,717 -326 5,183 e:\ ...\Standard Pacific- Fireside -Plan 5060.rhu Tuesday, February 18, -2014, 7:51 AM Roam Length: 247.1 ft. System plumber: 1 t Room Width: 1.0 ft. Zone lumber: 1 j Area: 247.0 sq.ft. Supply Air: 181 CFM s Ceiling Height: 18.0 ft. Supply Air Changes. 24 AC/hr € Volume. ; 4,448.0 cu.ft. Req. pent. Clg; 0 CFM Number of Registers: 2 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 °lam Actual Summer Vent.. 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 16 CF Actual Summer Infil.: 15 CFM W -Wall- 12F -Osw 10.2 X 18 W - GIs - Atrium shgc -0.33 0 °IBS 240.5 64 0.055 4.5 1,070 0.310 21.4 1,369 0.7 36.2 0 0 177 J 2,315 I W - GIs -Atrium shgc -0.33 O %S 24 0.310 21.4 513 36.2 0 668 Subtotals for Structure. 2,961 0 3,360 Infit.. Win.. 16.1, Sum., 15.2 329 3.038 998 0.667 -331 219 Ductwork; 193 233 ` AFD . Fxcurs :on: _. _..._..... . _.,..�.�� ..... _... _. �; . ��., ,w ._. _30 Room "Totals: 4,152 -331 4,116 I I i I i Y:\ ...\Standard Pacific - Fireside -Plan 5060.rhv 'Tuesday, February 18, 2014, 7:51 AM Room Length: 12.4 ft. System Number: 1 Room Width: 14.4 ft. Zone Number: 1 Area: 179,0 sq,ft. Supply Air: 97 CFM 's Ceiling Height: 10,0 ft. Supply Air Changes:: 12 AC/ hr f Volume: 1,'791,01 cu.ft. Req. Vent. Clg: 0 CFM Number of registers: 2 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil,: 13 CFM Actual Summer Infil.: 12 CFM W -Wall-I 2F-Osw 12,4 X 101 992 0.065 4.5 445 03 0 I 73 � - Wall -1 F -Osw 14.4 X 10 1202 0.065 4.5 539 0.7 0 88 W -GIs- Atrium shgc -0.33 O%S 25 0.310 21,4 535 36.2 0 904 -GIs-Atrium shgc -0.33 O % .....,., , .,.. 24 .. 0.310 21.4 513 .. _ ..... ..... 18 1 . ._., . 0 x.34 Subtotals for Structure: 2,032 0 1,499 Infil.: Win.: 13.1, Sum.: 124 266 1037 815 0,667 -270 179 Ductwork: 139 124 , AED Excursion: 162 i People: 200 lat/per, 230 sen /per 200 230 Room "fouls: 2,986 -70 2,194 r' :\ .., \Standard Pacific- Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7 :51 AM Room Length: 178.2 ft. System Number: 1 Room Width: 1.0 ft. Zone Number: 1 Area: 178.0 s% t. Supply Air: 58 CFM Ceiling Height: 10.0 ft, Supply Air Changes: 1.9 AC/hr Volume: 1,782.0 cu,ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply,: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 15 CFM Actual Summer Infil.: 14 CFM E -Wall-I 2F-Osw 22,2 X 10 203.9 0.065 4.5 914 0.7 0 150 S -Wall-I 2F-Osw 7,8 X 1 0 77.5 0.065 4.5 348 0.7 0 57 E -Door-Standard Garage Door 2.7 17.8 0.360 24.8 442 7 9 0 141 X 63 ------ ---- ......... .... ... Subtotals for Structure: 1,704 0 348 Infil.: Win.: 14,6, Sum.: 13.9 299 3.038 909 0.668 -301 200 Ductwork: 127 36 AED Excursion: 47 Room Totals: 2,740 -301 630 Y:\,.,\Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February 18, 2014; 7:51 AM Room length: 349.2 ft. System Number: ' 1 Room Width: 1.0 ft. Zone Number: 1 I Area: 349.0 sq.ft. Supply Air: 108 CFM Ceiling Height: 9.1 ft. Supply Ayr Changes: 2.1 AC /hr Volume: 3,172.0 cu.ft: Req. Vent. Clg: 0 CFM Number of registers: 2 Actual Winter Vent.: 0 CFM 4 Percent of Supply.: 0 % Actual Summer Vent,: 0 CFM Percent of Supply: 0 °lam 4 4 Actual Winter Infil : 12 CFM Actual Summer Infil.: 11 CFM t W - Wail- 12F�t�sw 12.3 X 91 87 0,65 4.5 Ct 0: 0 64 S - Wall- 12F -sw 14,6 X 9.1 117.4 0.065 4.5 526 0.7 0 86 W -GIs- Atrium shgc -0.33 0% a 25 0.310 214 535 362 0 904 S -Cis- Atrium shgc -0.33 O %S 15 0310 21.4 321 16.1 0 271 I UP- Ceil- 1603. 349.2 X 1 3492 0.026 1.8 627 12 0 418 Floor- 20P -30 1 X 16 9 .. _. ... 16.9 0 035 2 4 41 _.;..._ ......... _ _ .. _ ... 0 . �. . 0 .,w . _,... , 4 Subtotals for Structure: 2,440 0 1,747 Infil.. Win.: 12.0, Sum.: 113 244 3.037 742 0.667 -246 163 Ductwork: 155 139 AED Excursion: 182 , People: 20014 per, 230 sen /per: 200 230 Room Totals -46 2,461 XX Y Y:1 .., \Standard Pacific- Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7 :51 AM I Calculation Mode: Htg. & c1g. Occurrences; 1 Room Length: 65.0 ft. System Number, 1 Room Width: 1.0 ft. Zone Number: 1 Area; 65.0 s.ft. Supply Air; 11 CFM Gelling Height. 9,1 ft. Supply Air Changes: 1.1 AG /hr i Volume; 590.0 cu.ft. Rest, Vent. Glg: 0 CFM Number of Registers; 1 Actual Winter Vent.: 0 CFM Percent of Supply.; 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter lnfil.: 2 CFM Actual Summer lnfil.: 2 CFM j -Wall-1 2F-Osw 5.3 X 9.1 48.4 0.065 4.5 217 0.7 0 36 UP -Cell- 1613-38 65 X 1 65 0.026 1.8 117 1.2 0 78 rt Subtotals for Structure; 334 0 114 lnfil.: Win.: 2.4, Sum.: 2.2 48 3.037 147 0.661 -49 32 Ductwork; 23 9 i AED Excursion: 1 Room Totals: 504 49 168 f r i i 3 I i i i I I e:\...\Standard Pacific - Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM ....... . . . ... . ....... .. ... l �'�� t i ` �� ww,......a.w.,a.,.u.. �1,.., ,,,.a„,w„�,a a,„ ,wr,v. .., .,L,u.a.:. k.�. ,.a...u.,..w«� Load Proced.u Calculation Mode. Htg. & c1g. Occurrences: Room Length: 11.5 % System Number: Room Width 14.1 ft. Zone Number: Area: 162.0 sq.ft. Supply Air: 81 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 3.3 AC/hr Volume: 1,471,0 cu.ft, Req. Vent. Cig: 0 CFM Number of Registers: 2 Actual Winter Vent.: 0 GFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 11 CFM Actual Summer Infil.: 11 CFM S -Wall-12F-Osw 14.1 X 9.1 112.8 0.065 4.5 506 0.7 0 83 E -GIs-Atrium shgc-0.33 O%S 16 0.310 21,4 342 362 0 579 S -GIs-Atrium shgc-0,33 0 15 0.310 21.4 321 18.1 0 271 UP -Cell- 1613 -38 162 X 1 162 0.026 1.8 291 12 0 194 Floor-20P-30 I X 138 -_. 138 - U35 2.4 333 0.2 0 29 -- - --------- ,11-11-11 1 - -1 - - ------ -- ---- _, _ _ Subtotals for Structure: 2,190 0 1,221 Infil.: Win.: 11 .4, Sum.: 10.8 232 3.035 705 0.667 -234 155 Ductwork: 141 104 AED Excursion: 137 People: 200 Iat/ pe r, 230 sen/per: 1 200 230 Room Totals: 3,036 -34 1,847 ----------- ........ ... Y:\ ... \Standard Pacific- Fireside -Plan 5060,rhv ------ - --- — - ------------ Tuesday, February 18, 2014, 7:51 AM Y:\ ...\Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM Calculation Mode: Htg. & c1g, Occurrences: 1 Room Length: 180.9 ft. System Number: I Room Wid 0 It Zone Number: I Area: 181,0 sqft Supply Air: 74 CFM Ceiling Height: 9A t Supply Air Changes: 2.7 AC/hr Volume: 1,643.0 cu.ft. Req. Vent. CIg: 0 CFM Number of Registers: 2 Actual Winter Vent.: 0 CFM Percent of Supply.: • % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter InfjI 9 CFM Actual Summer Infil.: 9 CFM sw 3.4 X 9.1 30.8 0.065 45 138 0.7 0 3 sw 14 5 X 9.1 111.7 0.065 45 501 O7 0 82 S -Wall- I 2F-Osw 3,2 X • 1 294 0.065 4.5 132 07 0 22 E -GIs-Atrium shgc-0.33 O%S 20 0310 21.4 428 36.2 0 723 UP-Ceii-16B-38 180.9 X 1 IM9 0.026 1.8 324 12 0 216 Floor-20P-30 1 X 177.4 177.4 O035 ... .... . . ...... 24 428 0,2 0 37 Subtotals for Structure: 1,951 0 1,103 InfiI.1 Win.: 94, Sum,: 8,9 192 3.039 583 0.667 -193 128 Ductwork: 123 95 AED Excursion: 124 Peo I - 2 2 sen/per, 1 p e, 00 30 20 0 ... .. .. ... . .... 230 Room Totals: 2,657 7 1,680 Y:\ ...\Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM Calculation Made: Htg. & clg. Occurrences: 1 Room length: 141 ft. System lumber: 1 Room Width: 6.4 tt. Zone Number: 1 Area: 94.0 sq.tt. Supply Air: 6 CFM l Ceiling Height: 9.1 tt. Supply Air Changes: 0.4 AC/hr Volume: 855.6 cu.tt. Re q. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 0 CFM i Actual Summer Infil.: 0 CFM I P - Ce�I- 16R ®38 94.1 X 1 94.1 0.026 i.8 169 1,2 0 113 } Floor- 20P -30 1 X 13.6 18.6 0.035 2.4 33 0.2 0 3 I Subtotals for Structure: 202 0 116 Infil.: Win.: 0.0, Sum.. 0.0 0 0 0 0 0 0 3 Ductwork: 10 8 AED Excursion: _ 1 0 Room Totals: 212 0 133 I I i i 3 i � I e:\ —\Standard Pacific- Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM Calculation Mode: Room Length: Htg & c1g. 5.0 t Occurrences: System Number: Room Width: , Number Area* 48.0 q Supply Ceiling Height: 9 .1 ft Su A g r A C/hr V o l ume - , 4 31. 0 ._ * ! CFM Number of Registers: I Actual Winter Vent.: 0 CFM Percent Actual Summer Vent.: Percent pp yy 1 Actual . ..... ........ ---- ------- . ....... . .... - - - --- --------- -------------- ------- ---- w, _7 g ve Load Proce Calculation Mode: Htg, & c1g. Occurrences: 1 Room Length: 156.8 ft. Room Width: 1.0 ft. System Number: Zone Number: 1 1 Area: 157.0 sq.ft. Supply Air: 56 CFM Ceiling Height: 8.0 k Supply Air Changes: 2.7 AC/hr Volume: 1,254,0 cu.ft. Req. Vent. Cig: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 4 CFM Actual Summer Infil.: 4 CFM E -GIs-Atrium shgc-0.33 O%S 16 0.310 21.4 342 362 0 579 UP -Cell- 1613 -38 156.8 X 1 156.8 0,026 1.8 281 12 0 188 Subtotals for Structure: 958 0 822 Infil.: Win.: 4.4, Sum.. 4.2 91 3,034 275 0.662 -91 60 Ductwork: 60 72 AEU Excursion: People: 200 [a Vp er, 230 en/per: 1 2 23t7 i Room Totals: 1,293 109 1,279 Y:\ .,.\Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM C'4 "I Y :\ ,..\Standard Pacific - Fireside -Plan 5060.rhv Tuesday; February 18, 2014, 7:51 AM ��- Room 2 r f/ c� i.„_..�...a _,_....»,a.......,..<�., ..�..�__.�., .._n�._.n._..w.., .�..r.._.,..;: u,�N�„.......m.�,._,. i.... .�....,.,.�.,... ..�....,,�.a, ..n_,.._. .,...,_,....,...�. .....�......,.,d..w ,....w... .._m..;.�__.�....w..,.,.,,.m... _.. Calculation Mode: Htg. 8 c1g. Occurrences: 1 Room Length: 7.6 ft. System Number: 1 Room Width: 12.8 ft. Zone Number: 1 ° Area: 97.0 sq.ft. Ceiling Height 9.1 ft. Supply Air: Supply Air Changes: 35 CFM 2.4 AC/hr 1 Volume: 8810 ;cu.ft. Req. Vent, Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 9 CFM f Actual Summer Infil.: 9 CFM N - Wall- I 2F -Osw 12.8 X 9, 1 116.5 0.065 4.5 522 03 0 86 F - Wall- 12F -0sw 7.6 X 9.1 68.8 0,065 4.5 309 0.7 0 51 UP- Ceil- 1613 -38 97.3 X 1 97.3 6.026 1,8 175 1.2 0 116 Subtotals for Structure: .. 1,006 0 253 I Infil.: Win.: 9.1, Sum.: 8.6 185 1038 563 0.669 -186 124 Ductwork: 76 25 AED Excursion: _. _.,.. _. ,. __. _......_ .. ... w._ , _.... _..._ ........�..... _ _ ... _ �_ .a...... ... . _.. .. 32 .. w . ._.... _ _ .� �,. ,.,...,� Boom Totals: 1,645 -186 434 I 1 1 : t f € z 4 1 i I C'4 "I Y :\ ,..\Standard Pacific - Fireside -Plan 5060.rhv Tuesday; February 18, 2014, 7:51 AM Room Length: 21 0.0 ft. System Number: 1 Room Width: 1.0 ft. Zone Number: 1 Area: 210.0 sq.ft, Supply Air: 38 CFM Ceiling Height: 9.1 ft. Supply Air Changes:. 12 AC/hr Volume: 1,907.0 cu.ft, Req. Vent; Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.; 0 CFM Percent of Supply.: 0 °lam Actual Summer Vent.: 0 CFM 1 Percent of Supply: 0 % Actual Winter lnfil.: 7 CFM Actual Summer lnfil.: 7 CFM [ �4 - Wall- 12FOsw 15.8 X 9,1 127.7 0.(}65 4.5 573 0.7 0 I 94 N -GIs- Atrium sh -0.33 100 %S 16 03310 21.4 342 11.4 0 182 UP- eil- 1613-38 210 X 1 210 0.026 1.8 377 _. _ _ . 1,2 0 251 Subtotals for Structure: ubt f 1,292 0 527 l W als 7.0, Sum,: 144 1040 437 0.668 -145 96 Ductwork: 84 40 AEU Excursion. 53 Room Totals, 1,813 -145 716 tl i P l I FF� 1 I i Y \ ... \Standard Pacific - Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7 :51 AM Room Length: 12.2 ft. System Number: 1 Room Width: 5.3 ft, Zone Number: 1 Area: 65.0 sq.ft, Supply Air: 11 CFM Ceiling Height: 9.1 , ft. Supply Air Changes: 1.1 AC/hr Volume: 589.(7 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.. 0 CF Percent of Supply,: 0 % Actual Summer Vent.: 0 CFM ! Percent of Supply: 0 % f Actual Winter Infil.: 2 CFM Actual Summer Infil.: 2 CFM - Wall- 12F -Osw 5.3 X 9. 1 48.4 0.065 4.5 217 0.7 0 36 UP- Ceil -16 - 8 64.9 X 1 64,9 0.026 1.8 116 12 0 78 Subtotals for Structure. 333 0 114 Infil.: Win.: 2.4, Sum.: 2.2 48 3.037 147 0.661 -49 3 Ductwork: 23 9 , AED Excursion: 12 Room Totals. 503 -49 168 f 1 i i I 3 3 s 3 I I I I I I Y:\ .., \Standard Pacific - Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7:51 A Room Length: 388.6 ft. System Number: Room Width: 1.0 ft. ;done Number: Area: 389.0 sq.ft. Supply Air: Ceiling height: 9.1 ft. Supply Air Changes: Volume: 3,530.0 cu.ft. Req. Vent. Clg: Number of Registers: 3 0 Actual Winter Vent,. W -GIs- Atrium shgc -0.33 O °IBS 15 0310 Percent of Supply.: 321 36.1 0 Actual Summer Vent.: W -GIs- Atrium shgc -0.33 O %S 25 0310 Percent of Supply: 535 36,2 0 Actual Winter lnfil.: -tats- Atrium shgc -0.33 100 °IBS 10 0.310 Actual Summer lnfil.: 1 129.8 1 4.5 196 CFM 3.3 AC /hr 0 CFM 0 CFM 0 % 0 CFM 0 % 23 CFM 321 CFM N - Wall- 12F -Osw 16.5 X 9.1 129.8 0,065 4.5 582 0.7 0 95 S - Wall- 12F -Osw 16.6 X 9.1 130.8 0.065 4.5 587 01 0 96 W - GIs - Atrium shgc -0,33 O %S 15 0,310 21.4 321 36.1 0 542 1 W -GIs- Atrium shgc -0.33 O °IBS 15 0310 21.4 321 36.1 0 542 W -GIs- Atrium shgc -0.33 O %S 25 0310 21.4 535 36,2 0 904 -tats- Atrium shgc -0.33 100 °IBS 10 0.310 21.4 214 11.4 0 114 N -GIs- Atrium h e -0.33 100 %S 10 0310 21,4 214 11.4 0 114 -GIs- Atrium hgc -0.33 O %S 10 0.310 21.4 214 18.1 0 181 -GIs- Atrium shgc -0.33 O %S 10 0310 21.4 214 18.1 0 181 UP- Ceil -16B 38 388.6 X 1 388.6 . 0.026 , 1.8 697 1.2 0 465 Subtotals for Structure. 4,433 0 3,321 i lnfil.: Win.: 23.2, Sum.: 22.0 475 1038 1,442 0.668 -478 317 Ductwork: 286 251 I AED Excursion: 329 ' People: 200 lat/per, 230 sen /per: 1 200 230 Room Totals; 6,161 -278 4,448 t i i 3 7 { i i e\ ... \Standard Pacific- Fireside -Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM I Rec Room 1,107 6,393 135 6,6 - 1,007 -107 56 135 Bedroom 8 170 1,078 23 5 - 496 177 28 23 3 Bath 6 56 288 6 3 - 7 -5 0 6 4 Bed 8 Wic 38 537 11 3 17 -12 1 11 5 Mech 274 2,277 48 4 61 -46 3 48 6 Utility Closet 62 836 18 3 24 -18 1 18 7 Dining /OJpt 174 3,004 63 7 1,817 -87 101 80 Study /Bed 7 8 Foyer 94 1 36 6 - 835 -168 46 37 9 Pwdr 54 909 19 3 185 -116 10 19 10 Kitchen 457 1,897 40 7 1,837 -224 102 81 11 Great Room 318 5,717 121 7,7,7 - 5,183 -326 288 228 12 Nook 247 4,152 88 7,7 - 4,116 -331 229 181 13 Project/Opt Bed 6 179 2,986 63 6,6 - 2,194 -70 122 97 14 Mud Room 178 2,740 58 6 - 630 -301 35 58 15 Loft/Opt Bed 5 349 3,337 70 7,7 2,461 - 46 137 108 16 Bath 2 65 504 11 4 - 168 -49 9 11 17 Bedroom 3 162 3,036 64 6,6 - 1,847 -34 103 81 l 18 Bedroom 2 181 2,657 56 6,6 - 1,680 7 93 74 19 Laundry 94 212 4 4 - 133 0 7 20 Bath 3 48 694 15 5 - 474 -46 26 2 1 21 Bedroom 4 157 1,293 27 7 - 1,279 109 71 56 22 Wic 2 97 1,645 35 5 434 -186 24 23 Master Bath 210 1,813 38 6 - 716 -145 40 38 24 Wic 1 65 503 11 4 - 168 -49 9 11 25 Master Bedroom 389 6,161 130 7,7,7 4448 278 247 196 Humidification 5,708 Duct Latent -549 System 1 total 5, 225 62,074 ....... „190 a . 32 , 21 , 9 _..,. x,900 _ ,.,r 1 792 - . 1,420 System 1 Main "Trunk Size: 25x12 in. Velocity. 681 ft. /min @ Loss per 100 ft.,. 0.036 in..w Duct size results above are from Manual D Ductsize. Runout duct velocities are not printed with duct size results from Manual D Ductsize since they can vary within the room. See the Manual D Ductsize report for duct velocities and other data. r ran �;M i u *I r 1 iia Carrier Natural Gas or Propane Furnace 92.1 AFU C AI c f i *' R i CA RR IE R AIR C ONDITIO NING 93000 41500 n/a 41,500 Btuh n/a 0 Btuh Y:\...\Standard Pacific - Fireside -Plan 5O6O.rhv Tuesday, February 18, 2014, 7:51 AM Actual. 146 100% 41,500 0 41,500 andard Pacif io-Fireside- Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AS Y, Pacific-Fireside-Plan 5060,rhv Tuesday, February 18, 2014, 7:51 AM F System Zonel-� 1 Rec Room *135 135 135 135 135 0 135 135 6,6 2 Bedroom 8 28 41 *50 44 32 0 49 41 5 3 Bath 6 *6 6 6 • ♦ 0 6 6 3 4 Bed 8 Wic *it I I 11 11 11 0 11 11 3 5 Mech *48 48 48 48 48 0 48 48 4 • Utility Closet *18 18 18 18 18 0 18 18 3 7 Dining/Opt 101 1710 103 *110 101 0 94 103 7 Study/Bed 7 8 Foyer *46 41 36 39 43 0 36 37 6 9 Pwdr *19 19 19 19 19 0 19 19 3 10 Kitchen 102 107 *107 104 •8 0 107 107 7 11 Great Room *288 2•• 213 243 255 0 236 285 12 Nook *229 165 88 157 212 0 118 19• 7,7 13 Project/Opt Bed 6 122 122 103 108 103 0 113 *130 6,6 14 Mud Room *58 58 58 58 58 0 58 58 6 15 Loft/Opt Bed 5 137 129 107 118 121 0 117 *137 7,7 16 Bath 2 *11 11 11 11 11 0 11 11 4 17 Bedroom 3 103 *107 95 97 89 0 88 102 6,6 18 Bedroom 2 *93 84 66 80 86 0 58 78 6,6 • Laundry *7 7 7 7 7 0 7 7 4 20 Bath 3 *26 23 16 22 24 0 15 21 5 21 Bedroom 4 *71 64 49 61 66 0 43 59 7 22 Wic 2 *35 35 35 35 35 0 35 35 5 23 Master Bath 40 *61 55 43 •53 0 61 53 6 24 Wic 1 *11 11 11 11 11 0 11 11 4 25 Master Bedroom 247 239 201 227 229 0 222 *257 7,7,7 ghest CFM of all rotations. 00 East *1,791 *32,209 *-2,896 *2.68 45 Southeast 1,707 30,703 -2,897 2.56 90 South 1,432 25,757 -2,897 2.15 135' Southwest 1,619 29,114 -2,896 2.43 180 West 1,656 29,772 -2,896 2.48 225 Northwest 0 0 ♦ 0.•0 270 North 1,498 26,938 -2,896 2.24 315 Northeast 1,768 31,785 -2,896 Z65 Indicates highest value of all rotations. ........ ---- -- Y, Pacific-Fireside-Plan 5060,rhv Tuesday, February 18, 2014, 7:51 AM Y .,\Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM 30,0001 I E e.\..,\Standard Pacific-Fireside-Plan 5060.rhv Tuesday, February 18, 2014, 7:51 AM ?2 R-4,75 U=�21 R-21 WALLS IOX6 R38 CEILINGS R-30 FLOORS R-11 BASEMENTS R-15 FINISHED BASE U4 I SRJ7oOCF#A,A7 ( . � SR-160,0 �Fk�*,Af � . . � . . � �. . ; .- ; . . �� m� � � � �.�� � .» ! , \ •. .� », + � � . . � . . �. . ..� . � . . SR- 24(},103 CFNi,4Xi0X7 SR- 250,103 CFM,4X90X7 I a .. I $tkfi r $ 46 I i .L DUCTS,REGtSTS, AND GRILLS Y VARY IN LOCATION DUE TO AL ER CONSTUCTION CONSTRAINTS BUT CRUST ORIGINATE FROM THE NOTED SR 344?,44 CFlU1,4XiCIX R 3rocDrn 3 L J , s d e i T.G, x DUCT SIZE S cfr m 4 ALL OPEN TO BELOW ROOM CFLRS TO BE INCLUDED IN THE ROOM BELOW O R Y STE6 S V ^ 4 T I Y S P RES E NT T TH CF Y BE CFMS UNLESS A 2F a_ ��^yy. , �y y 3 cd ( FR p ldC: P x PEEN THE A BO V E &'.:. lfl' S P LIT S YSTEMS t3r}(IRR 2 A.�A0.1 f co r aa ALE. OPEN CONNECTING ROOMS Y SHARE CFM LOAD FOR TOTAL CFM M'tr Vii 2 IN CD COMMON AREA T.O.(X) DENOTES A TRANSFER GRILL ( BEING PIPE Si7E OR GRILL SIZE BETWEEN 1,G, ENDS) W.S. DEOTES A WALL RISER SR- 3213,0 CFM,4X1QX7 SR 290,74 CFM,4X90 6 ALL, RETURN t4z20 OR 5TC}N EQU V 3,4 I LO DRI SR- 250,103 CFM,4X90X7 R69W 601 ALUM. PPE W/ 3 -1/4 GRASS CAR EO STAMP LS 13212' N RANK 8O% PONT 14109 N-708326.7466 E- 1025512566 T35, P.2' I I I I 1 I i I I I I I� i� 1 I, M la IY� IW I I LOT 11 3819 0710 38M P p TV s s O 11858 11842 11828 NEST 39TH PLACE 0 2 1871 11851 RP 11831 G 2 11811 • 0 0 o s 398 H.O.A. C 3881 LOT 7 LOT 12 3884 3871 LOT 6 LANDSCAPING 3872 LOT 13 3881 LOT 5 C 3550 LOT 14 I 3851 3821 LOT 4 3848 LOT 15 3841 LOT 3 3836 1 <\ 1 0 LOT 22 11810 TRACT 8 E. 1/4 CORO" SEC. 20 T35, R69W 6TH P.Y. S AIW. i'Pf W/ 3 !BASS CAP l STAIIREEI ,313=13- N RAHOE E01 05310 ADDRESS PLAT PONT 14209 11212' N 9 RA" 0.1 a•0 DOUD OVERLOOK SUBDIVISION FILING NO. 2 BEING A REPLAT OF A PORTION OF DOUD OVERLOOK SUBDIVISION, --� LOCATED IN THE WEST HALF OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 20 AND THE WEST HALF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 29, `s TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN, I CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO 48 LOTS, 5 TRACTS & PUBLIC R.O.W. — 14.872 ACRES I 1 r 1 LOT 23 3890 1 rI �1 I TRACT USE I A 1 HO.A LOT 16 3831 1 H.O.A. C t UTUTE3 LOT if D UTRITES DRAINAGE k EYEROENCY ACCESS LOT 2 E LANDSCAPING N.O.A. TRACT C 3889.5 LOT 14 C 3m I 3824 3821 LOT 24 3880 h LOT 25 3870 M I LOT 26 3880 LOT 27 3850 LOT 28 3840 LOT 29 3830 1 * I LOT 17 - - - - * I j I 1 3812 11831 O M LOT 8 LOT 1 _ LOT 30 MI 3819 O 11871 3820 1 C I y8T11 PU►_�� POINT a T LS ,ea7 _r LOT 7 w -' TW •1RACT 0 LOT 31 + Lr 11820 t — 'a UN v K I? 3610 BRASS CAP y1p 11880 c r�oR7risioo 1331:• N RANK NI2 I 11890 11880 1 N- 7056727126 E- 1025618715 I 3801 W N O 3800.5 1RACT SE 1/4 SEC. 20� CAP 1 0 of ��` `� 1M►Tf �— _—J DD05TM0 \ I I2' LIB I N I I 1 I I IR TRACT USE TABLE TRACT USE OWNER A LANDSCAPING HO.A 8 DETEMI110H POND k VTMUTES H.O.A. C t UTUTE3 H.O.A. D UTRITES DRAINAGE k EYEROENCY ACCESS H.O.A. E LANDSCAPING N.O.A. 1 N N.O.A. -HOME OWNERS ASSOCIATION 1� I I I IEOE10 1 Nlocx ,RrLR SICWaR COINER R4W. RMT -OF -MY "ammy Lm LOT LINE 0057N0 PLATS rz:71cm uw ROAD O911ER Lm I x I 1 -4 POINT Of OMSV ICDIENT BE CORRNf SEC 20 TM. RRf 6TH P.Y. AWL PPE W/ 3-1/4 BRASS CAP STATED. %S 13512' N RANK BOX PONT ism — — N-705701.5458 E.1052301675 I I— 'SCALE: 1" - 60' CPI Vry.AL tPAOM: _:..LI DEVELOPER ENGINEER \SURVEYOR rlr`■rsn.�6 *"DAIQDPACtfjcHomjs CA RROLL& LA NGE- MA N HARD •/•RV6,Nro anLelA1►a aoYRWPn V A .P. a •et1`..- ��ira: �WriWR.i...�ow1• LOT 16 i LOT 17 11874 ' 1182'0 LOT 16 { I 3901 I 11900 I I LOT 15 V 3899 1 1 I TRACT C 3889.5 LOT 14 1 I 3WO I f LOT 13 j 3879 LOT 12 i � � "� d 3889 I City of W3.6atR I d C ,,,�g COMMUNny DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033-8001 P: 303,235.2846 F: 301235,2857 March 20, 2014 OFFICIAL ADDRESS NOTIFICA Z2IR!EAjMNMP CODE CORRECTION NOTIFICATION is hereby given that the following address has been assigned to the property/properties as indicated below: PROPERTY OWNER(S): Standard PaciFic of Colorado Inc. A Delaware Ca ration OLD ADDRESS: None '90 abor Cr. Wheat Ri d e Co '0033 '0 NEW ADDRESS: 3 "0 't'ab � or Ct. 80033 Block 1_ Lo t25 3870 ab I or Ct. 80033 033 3 60 1, ab 8 or Ct Ile t Ri e C W 0�810033 80033 3 5 Ta b or 8 0 T or Cr. Ct W heat R i C e 081 Blac o 'oc t 2 8 Block 1 -Lor 6 3801 Taft Ct. Wheat Rtd e C{ 3 3830 T abor Ct. Tab block l _ I of 3819 `Taft Ct, Wheat I2id e CC) 3 Black 1 Lor 9 3829 Taff Ct. Wheat Rzd CC 3 Black t -Lot 10 3839 "Taft Ct. Wear Rid e CC? 33 Stock l _Lot 11 384 Tafr Ct. Wheat Rid e C) 33 Black 1 -Lor 12 38E9 Tafil Ct. Wheat laid >e C( 33 33 Block I Lot t4 3889 Taft Ct. Wheat Rid e CCU 33 'oc "o' '90 abor Cr. Wheat Ri d e Co '0033 '0 Block I - Lot 4 3 "0 't'ab � or Ct. W heat: e R id 80033 Block 1_ Lo t25 3870 ab I or Ct. Wheat Ri e 0 80033 C B l ack 1 Lot 26 3 60 1, ab 8 or Ct Ile t Ri e C W 0�810033 S to c k Lot .1 1 7 3 5 Ta b or 8 0 T or Cr. Ct W heat R i C e 081 Blac o 'oc t 2 8 384 Ta b 0 or Ct' t R ea 80 0 0033 d e �Q� : Mac k 2 I -ot 9 3830 T abor Ct. Tab i Co hea R �e 33 �( 8 � �ock I Lot 30 38 0 or Ct Wheat Co e R id 80�033 3 Black 2 - Ilot 3 383E `Taft Ct. Wheat. Rid e CCU 80033 Black 2 - Lat 4 3848 Taft Ct. Wheat Rid e fC} 3 3 33 WWWA-Wheatridgexo.us I 1] IM1 4 JIM I I I 101 (Block l,ot 1 2 3871 Tabor Q. Wheat Rid (Block 2 – Lot 13) 3861 Tabor Ct.,Wheat Ridge, co 8o033 Block 2 -• -Lot 14 3851 Taber Ct. Wheat Rid e CC) 80033 (Block 2 -.- Lot 15113841 Tabor Ct,,Wheat Ridg cO 80033 fRIA01- I – T tit I Al 'A R I I 'rnl nr Of 1X71-4 DA,.- f^t onlill SUIRDIVISION: Doud Overlook Subdivision aka Fireside at Youn field Subdivision LOT(S): KEY: SECTION: — JEFFERSON COUNTY RECEPTION #: 2013143668 9mmmusm NOTES: This is a courtesy notification, AUTHORIZED BY. DATE: JUL-11timu NOTE: Please notify all other parties concerned. ADDRESS MAP UPDATED BY: DATE: