Loading...
HomeMy WebLinkAbout3812 Taft Court3�a mgr csr: INSPECTION RECORD INSPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/forms.aspx?fid=79 INSPECTION REQUEST LINE: (303) 234-5933 Occupancy/Type 9 RE Inspections will not be performed unless this card is posted on the project site. Call the inspection request line before 11:59 p.m. to receive an inspection the following business day.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Comments Initials Pier Concrete Encased Ground (CEG) Foundation / P.E. Letter Do Not Pour Concrete Prior To ADDroval Of The Above Insnections Underground/Slab Inspections Date Inspector Comments Initials Electrical Sewer Service Plumbing Do Not Cover Underground or Below/In-Slab Work Prior To ADDroval Of The Above Inspections Rough Inspections Date Inspector Initials Comments Wall Sheathing Mid -Roof Lath / Wall Tie Rough Electric Rough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw / Nail Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing Final Mechanical Roof Q Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. -For low voltage permits — Please be sure that rough inspections are completed from the Fire District and electrical low voltage by the Building Division. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather City of Wheat Ridge Residential Roofing PERMIT - 201702392 PERMIT NO: 201702392 ISSUED: 06/22/2017 JOB ADDRESS: 3812 Taft CT EXPIRES: 06/22/2018 JOB DESCRIPTION: Residential Re -roof to install Duration asphalt shingles 45 Sq. *** CONTACTS *** OWNER (314)359-1810 HADASS MONICA SUB (303)981-1265 Jon Lowrie 100243 Monarch Construction & Roofing *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 25,000.00 FEES Total Valuation 0.00 Use Tax 525.00 Permit Fee 442.05 ** TOTAL ** 967.05 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding Af-inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturera€"s installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer&#39;s technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. C r' heat Ridge P F :m Check List _ Property Address &Jje' to V0063 Permit Number p,0r-,j-)it Issued Date Owner Informatiou p-Mpe.rty Owner Information Property Owner Address Taft Court __1 I Ins actor Information Lill, inspection Company Inspector Name Inspector Contact info. Inspector xknowleduement I hearty acknowledge the roof I am inspecting is 6/12 or over. All roofs that are under 6/12 must be inspected by the City of Wheat Ridge Bulding Dept. * I Nearby acknowledge the roofing system for the referenced building has been inspected and found to be in compliance with the minimum requirements of the 2012 IRC and 2012 IBC as well as all City of Wheat Ridge Policies and Procedure and Manufacturers recommendations and specifications, Date: ---------------- inspector, ft.4oviaman Pro rt Owner State mentM Acknow',f­4Q--'--_ *1 hearby acknowledge that I am the owner of the building referenced above and I give my consent for the listed third -party inspection company to perform my roof i . nspection in itieu of the City of WheatC?'vi ton ection. Propery Owner/Agent: Z�z Gate: original document and permit card, as well as the roofing check list, must be submitted tc This oI I th4-, Chief Building Official within seven days of the final inspection. Drop off in person perr-lit counter 2nd floor 7500 W. 29th Ave L1 Wheat Ridge CO 80033 Q) w3`0 Draft Date-. 7/26/17 Please add note to reverse side Monica Hvdass (Jan 314 - "i,7 - 181D The City of Wheat Ridge Inspection Check List notes Final Roof c1 Roof Inspection ❑ N/A ❑ Pass ❑ Fail ❑ N/A [ Pass ❑ Fail Structural roof components ❑ N/A IX Pass ❑ Fail Verify that no more than 2 layers of shingles exist ❑ N/A P� Pass ❑ Fail Flashing for roof and walls N1 Pass ❑ Fail If new sheathing is installed verify that it is listed in the permit description (Valuation must be adjusted) ❑ N/A 4 Pass ❑ Fail Verify sheathing nail pattern (See Policy & Procedures) t N/A ❑ Pass ❑ Fail Crickets and saddles where needed ❑ N/A Pass ❑ Fail Verify B vent must have boot same gauge as pipe ❑ N/A Pass ❑ Fail Verify vent caps ❑ N/A ® Pass ❑ Fail Verify no flashings are damaged or rusted ❑ N/A N Pass ❑ Fail Step flashing shall be min. of 4x4 piece per shingle N/A ❑ Pass ❑ Fail Verify scuppers allow for proper drainage ❑ N/A 71 Pass ❑ Fail Ice and water shield 2' in heated wall spaces ❑ N/A I Pass ElFail Underlayments must follow 2012 IRC / 2012 IBC ❑ N/A Pass ❑ Fail Verify roof slope for proper drainage ❑ N/A Pass ❑ Fail Dripedge shall have min of 2" overlap ❑ N/A �d Pass ❑ Fail Dripedge should extend down min 2" past roof deck ❑ N/A 1� Pass ❑ Fail Dripedge shall be mechanicaly fastened 12" OC N/A ❑ Pass ❑ Fail 90 LB roll roofing shall not be applied to roof slopes less than 2:12 slope; Exception: detached garages, patios, carports, open on three sides with min. slope of 1:12 N/A ❑ Pass ❑ Fail Modified Bitumen, EPDM, TPO min slope 1/4:12 slope N/A ❑ Pass ❑ Fail Above roof insulation R-25 N/A ❑ Pass ❑ Fail Below roof residential R-38 N/A ❑ Pass ❑ Fail Below roof commercial R-32 N/A ❑ Pass ❑ Fail Modified Bitumen, EPDM, TPO min slope 1/4:12 slope must be installed in accordance with the manufacturer's specifications - Must have manufacturer's letter of warranty with the address on the letter for final inspection Metal Roof Shingles Requirements ❑ N/A ❑ Pass ❑ Fail Metal roof shingles shall not be installed on slope less 3:12 ❑ N/A ❑ Pass ❑ Fail Metal valley flashing shall be the same material as roof ❑ N/A ❑ Pass ❑ Fail Metal valley flashing shall extend a min of 8" from the centerline with a min. of 3/4 " high splash diverter rib built-in at the flow line with sections overlapping a a min. of 4" Tile Roofs Requirements ❑ N/A ❑ Pass ❑ Fail Clay and concrete tile shall have a min. 2-1/2:12 slope Slopes 4:12 and under require double underlayment Company Name: Inspector signature: Date of Inspection: The City of Wheat Ridge Inspection Check List notes Final Roof Notes Mark Benjamin PE PHI -D&E Inc. dba Crown Jade (-com) Design and Engineering PO 17, Ft. Collins CO 80522 970-472-2394 PDO LI�F��. Oeseoa®ee �U Vie P� g`N✓,9�e�0 SP Z 383 0 r The City of Wheat Ridge Inspection Check List notes �� k�A Mid -Roof zwl Roof Inspection ❑ N/A ❑ Pass ❑ Fail ❑ N/A In Pass ❑ Fail Structural roof components ❑ N/A Pass ❑ Fail Verify that no more than 2 layers of shingles exist ❑ N/A Pass ❑ Fail Flashing for roof and walls Pass ❑ Fail If new sheathing is installed verify that it is listed in the permit description (Valuation must be adjusted) ❑ N/A Pass ❑ Fail Verify sheathing nail pattern (See Policy & Procedures) N/A Pass ❑ Fail Crickets and saddles where needed ❑ N/A I❑ Pass ❑ Fail Verify B vent must have boot same gauge as pipe ❑ N/A Pass ❑ Fail Verify vent caps ❑ N/A Pass ❑ Fail Verify no flashings are damaged or rusted ❑ N/A Pass ❑ Fail Step flashing shall be min. of 4x4 piece per shingle ❑ N/A ❑ Pass ❑ Fail Verify scuppers allow for proper drainage ❑ N/A Pass ❑ Fail Ice and water shield 2' in heated wall spaces ❑ N/A Pass ❑ Fail Underlayments must follow 2012 IRC / 2012 IBC ❑ N/A Pass ❑ Fail Verify roof slope for proper drainage ❑ N/A I Pass ❑ Fail Dripedge shall have min of 2" overlap ❑ N/A z Pass E]Fail Dripedge should extend down min 2" past roof deck ❑ N/A 1 M Pass ❑ Fail Dripedge shall be mechanicaly fastened 12" OC L1J N/A ❑ Pass ❑ Fail 90 LB roll roofing shall not be applied to roof slopes less than 2:12 slope: Exception, detached garages, patios, carports, open on three sides with min. slope of 1:12 N/A ❑ Pass ❑ Fail Modified Bitumen, EPDM, TPO min slope 1/4:12 slope N/A ❑ Pass ❑ Fail Above roof insulation R-25 N/A ❑ Pass ❑ Fail Below roof residential R-38 N/A ❑ Pass ❑ Fail Below roof commercial R-32 N/A ❑ Pass ❑ Fail Modified Bitumen, EPDM, TPO min slope 1/4:12 slope must be installed in accordance with the manufacturers specifications- Must have manufactures letter of warranty with the address on the letter for final inspection Metal Roof Shingles Requirements ❑ N/A ❑ Pass ❑ Fail Metal roof shingles shall not be installed on slope less 3:12 ❑ N/A ❑ Pass ❑ Fail Metal valley flashing shall be the same material as roof ❑ N/A ❑ Pass ❑ Fail Metal valley flashing shall extend a min of 8" from the centerline with a min. of 3/4 " high splash diverter rib built-in at the flow line with sections overlapping a a min. of 4" Tile Roofs Requirements ❑ N/A ❑ Pass ❑ Fail Clay and concrete tile shall have a min. 2-1/2:12 slope Slopes 4:12 and under require double underlayment The City of Wheat Ridge Inspection Check List notes Mid -Roof Notes Company Name: Inspector signature: Date of Inspection: G `? Mark Benjamin PE PHI -D&E Inc. dba Crown Jade (com) Design and Engineering PO 17, Ft. Collins CO 80522 970-472-2394 City of Wheat Ridge Residential Roofing PERMIT - 201702392 PERMIT NO: 201702392 ISSUED: 06/22/2017 JOB ADDRESS: 3812 Taft CT EXPIRES: 06/22/2018 JOB DESCRIPTION: Residential Re -roof to install Duration asphalt shingles 45 Sq. *** CONTACTS *** OWNER (314)359-1810 HADASS MONICA SUB (303)981-1265 Jon Lowrie 100243 Monarch Construction & Roofing *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 25,000.00 FEES Total Valuation 0.00 Use Tax 525.00 Permit Fee 442.05 ** TOTAL ** 967.05 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding A;�-inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturera€"s installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer&#39;s technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201702392 PERMIT NO: 201702392 ISSUED: 06/22/2017 JOB ADDRESS: 3812 Taft CT EXPIRES: 06/22/2018 JOB DESCRIPTION: Residential Re -roof to install Duration asphalt shingles 45 Sq. I, by m signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed and that all work to be pert6rmed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date I. This permit was issued based on the information provided in the permit application and accompanyingdans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original perinit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a pennit for or an approval of, any violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief '1i d t s VL al __7n Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line. Antoinette Kulick X I l G -L - From: no-reply@ci.wheatridge.co.us Sent: Tuesday, June 13, 2017 11:03 AM To: Permits CommDev Subject: Online Form Submittal: Residential Roofing Permit Application Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. Permits are currently being processed within 3-5 business days, subject to change based on volume. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email Address Do you have a signed contract to reroof this property? It will need to be provided at the time of permit pick-up. 3812 taft ct monica hadass 3143591810 edfleegler@gmail.com Yes CONTRACTOR INFORMATION Contractor Name Contractor's License Number (for the City of Wheat Ridge) Contractor Phone Number monarch construction and roofing 100243 3039811265 Contractor Email Address blowrie@monarchroofs.com (permit pick-up instructions will be sent to this email) Retype Contractor Email blowrie@monarchroofs.com Address DESCRIPTION OF WORK Is this application for a Yes new permit for a residential roof? Are you re -decking the No roof? Description of Roofing duration Material Select Type of Material: Asphalt If "Other" is selected Field not completed. above, describe here: How many squares of the 45 material selected above? Does any portion of the property include a flat roof? If yes, how many squares on the flat roof? No Field not completed. TOTAL SQUARES of all 45 roofing material for this project z Provide additional detail house pitch is 6/12 here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract 25000 value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant brie lowrie Email not displaying correctly? View it in your browser. 3 i:'011 I RI -i'110" & W(Z I'1VC,' 11C. Customer Narne /t / % / ~ fi 1 J�, ��► t *�' E. _ 1 - � � Address 3 1. / C7- s�� .% 4ialfe tits Phone, 311/ 57 '" `% j Alt. Phone Email s ' lIee j lel— t-: Insurance Company r�* /r/�1�/r� ��✓'� Claim # �% ins.poticy # Monarch Construction & Roofing, LLC will be referred to in this contract as Monarch. The scope of work and materials identified below are the scope of worts recommended by Monarch: Construction & Roofing; Monarch is not obligated to perform any part of the scope of work that is not approved by the insurance company unless you authorize the work and agree to pay for this additional work. ��,, //tr1 ,; ry1��. f Shin le Manufactur r: 6�'4/G /t/ Tv e: 1t l Calor °`� Int. r 1/ ear off all existing layers (, L tayers) Tear off one layer of wood; shake shingles Install Decking (7,116" OSB) .0,_ sheets of OSB are included, each additional sheet will be $65 per sheet install New idnderla ^_151b. ^ 301b. Synth �_ nstall Pre -Painted metals to code Brown Charcoal Tan Gray White Other 1nta�__. 3� __ Valley(s) will be closed with ice & water shield 0 Valiey(s),will be open Ridge (s) to be color -coordinated with shingle _ Ridge(s) to be High -Profile and color -coordinated with shingle kk stall new pipe jacks „place vents as needed Re -flash chimney(s) and all wall abutment as needed _... install Ridge Vent __............ LF to AA4 ir`est stall Ice & Water shield per code, as well as all vents and skylights Install'# -6 nails per shingle as required by city/county codes. atPiti#el piste Alignment (eachcustomer will need to contact the provider to rd align dish alter roof installation) int. __.......... Final inspections will be completed as city/counties allows, i have read the back of contract-# 23 int. l_� _;� 5 -year workmanship warranty on roofing, all other construction trades will receive a 1 yr. workmanship warranty _ Extended Warranty Per Sq. $—,—_ Circle: Owens Corning Platinum CAF Other: onarch Construction & Roofing will provide general liability insurance coverage of $2,000,000 general aggregate rform magnetic sweep of driveway and yard for removal of any nails -,�move all trash and debris from work listed ' Gutters .5 LF Size: 5 -inch or 6 -inch Color: ~_ Replace utter Screens Type- `Insurance funds ins ude Mortgage Company !Yes No If yes please complete the third party authorization form) Int. Special lnstruetionslt_? The approximate cost of the services based on damages known at the time this contract is entered is r� determined by ice! �1—. !` " 1 insurance. Monarch will perform the scope of work approved by the insurance company. Monarch will suppiememrd forritems priced low, not included or items needed to pass c tycounty codes, which may increase initial dollar amount that insurance is paying out Supplemental claims billed] by Monarch that are approved by the insurance company for additional wcr., or ncreases in costs become a part of this contract. The final scope and price agreed on between the insurance company and Monarch shall become the finacontract price for the nsurance approved scope. Customer will be responsible to pay for any upgrades; deductible, non-recoverable deprecation or additional work authorized by the customer that the insurance company determines is not covered within the scope of coverage provided by your insurance policy. Approximate pates of Service:6Ax___a * tai_ _........__.._ ....__._ these dates of service are subject to change due to unusual delays in transportation of materials, payment delays, insurance approval, ordinary weather delays, or by any other causes beyond reasonable control of Monarch. Monarch will provide communication to customer to show tentative dates, Notice: If the property owner pians to use proceeds of a property and casualty insurance policy issued.pursuant to part 1 of article 4:10, C,R.S., to pay for the roofing work, pursuant to section 6-22-105, the roofing contractor cannot pay. waive, rebate, or promise to pay, waive, or rebate all or part of any insurance deductible applicable to the insurance claim for payment on the covered residential property. 1(we) hereby authorize & instruct the insurance company & lien holders to include the narne of Monarch Constniction & Roofing LLC as co -payee on any subsequent loss draft or checks after today's date as indicated above. t (we) authorize any legal representative andlor agent of Monarch Construction to obtain information necessary to complete any funding process relative to the claim number referenced above. I (we) further authorize Monarch to yick upin pers any loss drafts or checks on mylour behalf and behalf of Monarch, Deposit Amount: $ 045Z9 f c" 0 Date: ,.� / Rec, Initials Monarch ionstwetion &Roofing LLC sha!I hold in trust any payment from the property owrer until Monarch Construction & Roofing IUC has delivered roofing rratenals at the res ciential uwpe.ly ..ile cr hay L.rform©d a rro,o,ny of the roofing work on the property. I (we) agree, by signing below, to all the contract conditions, both front and back of this agreement. Date of Acceptance, n 17 i CITY OF WHEAT RIDGE Building Inspection Division �9�(303) (303) 234-5933 Inspection line_: 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Job Address: 7t, �l�L C� Permit Number:3�2- r( ❑ No one available for inspection: Time ,Q r_J /PM - "#fie=Inspection required:Yes No When corrections have been tle, call for re -inspection at 303-234-5933 Date:21310 Inspector: DO NOT REMOVE THIS NOTICE 1 / �W City of O Wheat -Midge COMMUNITY DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033 -8001 P: 303.235.2846 F: 303.235.2857 March 3, 2015 OFFICIAL ADDRESS VERIFICATION NOTIFICATION is hereby given that the following address has been assigned to the property /properties as indicated below: PROPERTY OWNER(S): Standard Pacific of Colorado. Inc. A Delaware Corporation NEW ADDRESS: (Block 2 — Lot 1) 3812 Taft Ct., Wheat Ridge CO 80033 SUBDIVISION: Doud Overlook Subdivision aka Fireside at Youngfield Subdivision LOT(s): KEY:_ SECTION: JEFFERSON COUNTY RECEPTION #: 2013143668 PARCEL NO: 39- 204 -05 -020 NOTES: This is a courtesy notification. AUTHORIZED BY: DATE: 3 — `� 1 �✓ DISTRIBUTION: 1. Property Owner 2. Jefferson County Assessor, ATTN: Data Control, 100 Jefferson County Parkway, Golden, 80419 3. Jefferson County Mapping, ATTN: Addressing, 100 Jefferson County Parkway, Golden, 80419 4. U.S. Post Office, 4210 Wadsworth Blvd., CO 882}2 -9938 X003 5. Xcel Energy, ATTN: Correspondence, 1123 W. 3' Ave., Denver, CO 80223 6. Century Link, Capacity Provisioning Specialist, 5325 Zuni St., Room 728, Denver, CO 80221 7. Comcast, Attn: Scott Moore, 6850 S. Tucson Way, Englewood, CO 80112 8. Consolidated Mutual Water 9. Westridge Sanitation District 10. Wheat Ridge Fire Department #2 1 l . Wheat Ridge Planning Division 12. Wheat Ridge Building Division 13. Wheat Ridge Police Department 14. GIS Specialist 15. Log File 16. Other: NOTE: Please notify all other parties concerned. ADDRESS MAP UPDATED BY: DATE: www.d.wheatridge.co.us N Site [ I...,:. : a.. A A A, Ci ty of �COMMIJNI DEVELOPMEN ..��g h6 jijd * �* ♦ F R OFFICE USE 0 iLY x F F x .. s. P acific s F....,. 303 a # F 0 WIling ddmsi! f"if different than property address) Address: 7800 East Dorado Place, Suite 2201 C!! y, tete, f Centennial, CO 80111 9 F i Il l 1 1 1 1 11 1, r located at the above referenced address. Please note the comments checked below For items not constructed, the amount of funds taken in lieu of construction: 3. v Does all existing roadway/alley R.O.W. meet the standards of the City: _.!��Yes No If not, what is required? If R.O.W. is required, has the deed been received. Yes No (see Note below) NOTE: All deeds must be reviewed and anni-oved rttr-16L M 4, APPROVED: The Public Works Department has reviewed the submitted material and hereby approves this Permit Application, subject to the stated requirements and/or attached stipulations. Signature David F. Brossman, P.LS, Date 5. -NOT APPROVED: The Public Works Department has reviewed the submitted material and does not approve this Permit Application for the stated reason(s): Signature David F. Brossman, .P. .S. Date 6. Stipulations: 7, A Drainage Certification Letter accompanied by-4,+4::�� �rom the Engineer-of-Record shall be required prior to the issuance of the Certificate of Occupancy. 8. -�_ NOTE- ANY DAMAGE TO EXISTING PUBLIC IMPROVEMENTS ASA, RESULT OF PROJECT CONSTRUCTION SHALL BE REPAIRED PER ROW CONSTRUCTION PERMIT PRIORTOTHE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. Rev 06/2013 City of g , LIC WORKS Purpose of Construction: .� Single Family Commercial Multi - Family (Requi,red of all projects for document processing) Single Family a #, 1 IF ^ A «» Co mereia ulti- FaLnilLE ig Fees: TOT R EVIEW k PLEASE NOTE THAT IN ADDITION TO TIM ABOVE FEES, THERE WILL BE ADDITIONAL IjCENSING AND PERMITTING FEES REQUIRED FOR CONSTRUCTION OF IMPROVEMENTS WITHIN PUBLIC wwwA.wheatridge.co.us Rev 1212 ALIRIewood at Fireside (Doud) — Plan Review Worksheet Address: Doud Subdivision, Filing 2, Lot #: Applicable survey conditions: FND (survey at foundation) NR S (survey prior to CO, a fwithin 2 feet of setback) ,.DOUDI (landscaping) ,DOUD2 (setbacks) Lot Size: sq. ft. Maximum Building Coverage (40%): 'y' 6 / sq. ft. 5411 . -3 % Is the structure within 2 feet of minimum setbacks? e (If yes, add surveying condition FND) 7500 West 29th Avenue City of Wheat Ridge, Colorado $0033 Wh6qat -,I. 303.235.2846 Fax: 303.235.2857 "I Me — Property locate N I 21'alt Ct. referenced as Case No. WA- 1 4-17 / Standard Pacific of CO; and WHEREAS, City staff found basis for approval of the variance, relying on criteria listed in Section 26-115 of the Wheat Ridge Code of Laws and on information submitted in the case file; and WHEREAS, the Community Development Department has properly notified pursuant to Section 26-109 of the Wheat Ridge Code of Laws; and With the following conditions: 1. Construction of the home be generally consistent with Exhibits 3, 4 and 5, subject to staff review and approval through review of a building permit. —j- � — Dat MIMM x ! y • s Pe ' #. ofAuthofized Agent 1 Date application must be Aped by S ch sub-coutractor # # # itl ti ? the ::ii ulll City of _]�,,�Wh6atFkjogie M allapp ocatea at .3 6 T 7 7 att referenced as Case No. WA- 14-17 / Standard Pacific of CO; and WHEREAS, the Community Development Department has properly notified pursuant to Section 26-109 of the Wheat Ridge Code of Laws; and NOW THEREFORE, be it hereby resolved that a I -foot variance ftorn the 17.5-foot side setback, requirement, resulting in a 16.5-foot side setback for the purpose of constructing a single family home on property in the Planned Residential District (PRD) zone district (Case No. WA-14-17 / Standard Pacific of CO), is granted for property located at 3812 Taft Court (Lot 1, Block 2 Doud Resubdivision), based on the following findings of fact: With the following conditions: 1. Construction of the home be generally consistent with Exhibits 3, 4 and 5, subject to staff review and approval through review of a building pen _ Community DeveI anent Director Administrative P "arietnce 14 Slandard Pacifir o1``CO W' KIIKMMOILI. # , V W , City of h6atRiji�dgc WHEREAS, an application for a variance was submitted for the property located at 3812 Taft Ct. referenced as Case No. WA- 1 4-17 / Standard Pacific of CO; and WHEREAS, City staff found basis for approval of the variance, relying on criteria listed in Section 26-115 of the Wbeat Ridge Code of Laws and on information submitted in the case file; and WHEREAS, the Community Development Department has properly notified pursuant to Section 26-109 of the Wheat Ridge Code of Laws; and NOW THEREFORE, be it hereby resolved that a 1 -foot variance from the 17.5-foot side setback requirement, resulting in a 16,5-foot side setback for the purpose of constructing a single family home on property in the Planned Residential District (PRD) zone district (Case No. WA- 1 4-17 / Standard Pacific of CO), is granted for property located at 3812 Taft Court (Lot 1, Block 2 Doud Resubdivision), based on the following findings of fact: With the following conditions: 1. Construction of the home be generally consistent with Exhibits 3, 4 and 5, subject to staff review and approval through review of a building permit. 3 Dat Community Develoment Director 2180 South Ivanhoo Strcae't Suite� 5 W ws lk i s!e� � .n a a r , Oanvfar, Colorado 80222-5710 303-759-8100 Fax 303-756-2920 wwwagwassenaancom TORN L�I� brown Sand, medium dense, silty, slightly clayey, moist, brown Sand and Gravel, dense, silty, wet, brown Su4ject December 3, 2013 1 �aned, Standard Pacific of Colorado, Inc. Project Number 135293 January 31, 2014 Page 2 For sites with a risk assessment of high or very high, we recommend an interior floor system engineered for expansive soils be constructed. An alternative to the use of an engineered floor system, such as soil modification to reduce the risk assessment, may also be considered. In addition, an engineered interior floor system is recommended for all finished areas or any other areas where floor movements cannot be tolerated, Standard Pacific of Colorado, Inc. Project Number 135293 January 31, 2014 Page 3 uIsTow - ImA101111LOMMLUO mun If the Builder and/or Owner desires to construct a concrete slab-on-grade and accepts the risk of slab movement, slabs supported by the expansive subsurface materials should be constructed using the following criteria 1 Slabs should be separated from exterior walls and interior bearing members with a joint which allows free vertical movement of the slab. 2. Slab bearing partitions should be constructed with a minimum 2-inch void space. Stairways bearing upon the slab should be constructed in such a way as to allow at least 2 inches of slab heave, In the event of slab heave, the movement should not be transmitted directly through the partitions to the remainder of the residence, 1131TIMP M- isk assessments. wlwwwll�% �f �M *_ ©< Project Number 135293 January 31, 2014 age! \ � / Standard Pacific of Colorado, Inc. Project Number 135293 January 31, 2014 Page 5 & Plastic membranes should not be used to cover the ground surface immediately surrounding the foundation. These membranes tend to trap moisture and prevent normal evaporation from occurring. We recommend the use of a weed suppressant geotextile fabric. This report was prepared for the exclusive use of our Client for the sole purpose of providing geotechnical design criteria for the subject structure based upon the existing site cond tions as encountered. The conclusions and recommendations contained in this report shall not be Standard Pacific of Colorado, Inc. Project Number 135293 January 31, 2014 Page 6 considered valid for use by Others without written authorization from A. G. Wassenaar, Inc. In addition, the state of practice in geotechnical engineering is constantly evolving. Therefore, findings presented in this report should be reviewed and revised, if necessary, prior to actual construction. Sincerely, s e S ;35- 0 Michael R. Corink, P� Senior Engineer D on ld L L. Ta E identi T' BKFILL /- SLIP JOINT WIDTH i} IN k } 0 1PE AT HIGH POINT. ♦ i } lifflivillIMEMM21'. ! f • ft •" ! " Mir • y} } fill k THE FOUNDATION. # + k Geotechnicat and En*onmentat Consultants r FOOTING FOUNDATION TYPICAL INTERIOR DRAIN Manual S, D, Standard Pacific, Fireside Plan 5662 Equipment: Furnace = Carrier Model 59SC2BO8OS21 - -20 ( 0000 BTU) Air Conditioner = Carrier Model CAI3NA035 * * * *(A,B )} (3 Ton) Evaporator Coil = Carrier Model CNPV *4221AL * +TDR (3.5 Ton) Duct Summary -:, .� Num ber O *C tr unk$.: 3 1 Number of active aura . . 30 Total run out oug rai w: 1,2811 Wheat Rid ge I Main trunk air8o r: 1, Largest trunk diamete 18,6 100 Largest runout dia a a iding Department ' o ved I — 4DTi I WOO , of aww"i • xr+r °• a sw 1 s + t • a s .a; ts.. ! • + A P R 4 W— Wheat Ridge [301d'Mg Signed..... Detailed Coaling Capacities d Detailed Coaling Capacities Y:\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM � Main Trunk Runouts Calculate: lies Yes Use Schedule: Yes Yes � Roughness Factor: 0.00300 0.01000 Pressure Drop: 0.1000 in.wg. /100 ft. 0.1000 inwg. /100 ft. Minimum Velocity: 650 ft. /min 450 ft. /min Maximum Velocity: 900 ft. /min 750 ft. /min Minimum Height: 0 in. 0 in. Maximum Height: 0 in. 0 in. I Winter Summer f Infiltration Specified: 0.200 AC /hr 0.200 AC /hr 95 CFM 95 CFM Infiltration Actual: 0.279 AC/hr 0.279 AC /hr Alcove Gracie Volume: X 23.403 C.ft. X 28, Cu.ft. 7,921 Cu:ft. /hr 7,921 Cuft. /hr X 0.0167 X 0.0187 Total Building Infiltration: 132 CFM 132 CFM Total Building Ventilation: 0 CFM 0 CFM --- System 1 n= Infiltration & Ventilation Sensible Gain Multiplier: 14.39 = (1.10 X 0.317 X 16.00 Summer Temp. Difference) Infiltration & Ventilation Latent Gain Multiplier: -21.70 = (0.68 X 0.817 X -39.04 Grains Difference) Infiltration & Ventilation Sensible Loss multiplier: 62,04 '= (1.10 X 0.817 X 69.00 Winter Temp. Difference) l Winter Infiltration Specified: 0.200 AC /hr (95 CFM) Summer Infiltration Specified: 0.200 AC /hr (95, CFM) t l i 3 `s I Y :\ ...\Plan 5062.rhv Tuesday, February 18, 2014, 3 :19 PM FORMIERM Load Preview R SYSI Sys Sys Nall Stec 2� Sen La N e( den " Htg Cl 9 Act L.��tnvll Duct Scope 01 Area' Gain Gain Gain Loss CFM i CFM CFM Size Bu ldrng Z05 2.05 2,688 5,507 24,583 -1,865 24,583 48,227 925 1,100 1,100 System 1 2.05 2.05 2,688 5,507 24,583 -1,865 24,583 48,227 925 1,106 1,100 25x1 2 Humidification 1,797 Zone 1 5,507 24,583 -1,865 24,583 46,430 925 1,100 1,100 12x15 1 -Rec Room 839 1,104 -90 1,104 4,582 91 49 91 7,7 2-Bath 4 52 9 -7 9 284 6 0 6 3 3-BR 4 196 469 -18 469 1,100 22 21 22 6 4-Unf basement 1,664 1,903 -225 1,903 10,606 211 85 211 6,6,6 5-Great Room 246 2,893 -216 2,893 4,342 87 129 129 7,7 6-Kitchen/Nook 484 5,067 -275 5,067 4,244 85 227 227 8,8 7-Dining 173 955 -112 955 1,470 29 43 43 7 8-Master BR 306 3,702 -223 3,702 4,926 98 166 166 7,7,7 9-WC 19 74 -32 74 269 5 3 5 3 10-Master Bath 291 1,102 -118 1,102 1,659 33 49 49 5,5 11-W1 C 93 226 -67 226 656 13 10 13 4 12-BR 2 196 1,575 -54 1,575 2,556 51 70 70 6,6 13-Bath 2 44 59 0 59 80 2 3 3 3 14-Laundry 94 470 -113 470 1,431 29 21 29 4 15-BR 3 179 1,208 94 1,302 1,439 29 54, 54 7 16-Bath 3 60 430 -83 430 855 17 19 19 4 17- DR 52 69 0 69 93 2 3 3 3 18-Study 150 1,973 -68 1,973 2,914 58 88 88 6,6 19-Entry 93 815 -184 815 1,885 38 36 38 5 20-Hall 276 481 -74 481 1,039 21 22 22 5 Sum of room airflows may be greater than system airflow because ' sy tern room airflow op Lion uses the rester of heating , or coo lie j Y:\.,,\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM , " ,-,- � �' i 11) -- -Duct Name: S T -100, Feeds Into: Unt basement, Fitting: 1 -01, Effective Length: 147.6 Trunk 0.0003 18.6 527 0.000 k Up. Fan 55 25 0.022 0.033 Rect 0.8 12 146.7 0.333 Presize , 1,098 5.1 0354 0.446 i -- -Duct Name: STA 10, Deeds Into: Unf basement, Effective Length:. 3. Trunk 0.0003 15,2 307 0.000 Up: SM' -100 128 20 0.010 0.000 Rect 3.7 10 0.0 0.000 Presize 427 18.3 0354 0.446 -- -Duct Name. ST-120, Feeds Into: Unf basement, Effective Length. 2.5 Trunk 0.0003 18.6 322 0.000 Up. M "-100 55 25 0.000 0w000 ! Rect 2:5 12 0.0 0.000 Presize 670 15.4 0354 0.446 } i -- -Duct Name: SR -100, Supplies: faster RR, Fittings. 2 -1, 4 -H, Effective Length. 42 »8 Runout 0.0003 7 206 0.000 i Up. ST -130 55 5.4 0.012 0.005 } Rnd 2.7 7.7 40.2 0.005 t Presize 55 4.9 0345 0.455 -- -Duct Name: SR ^118, Supplies: Faster RR, Fittings: -1, 4-G, 8 -A2, 8-A2, Effective Length: 78.8 Runut 0.0003 7 206 0 =002 Up: T -390 55 5A 0.012 0.008 Rnd 14.2 7.7 64.6 0.009 Presize 55 26 0.340 0.460 1 -- -Duct Name: ST -130, Feeds Into: Unf basement, Effective Length: 0.8 Trunk 0.0003 6.7 198 0.000 Up. ST -390 55 4 0.014 0.000 ! Rect 0.8 10 0.0 0.000 Presize 55 1.9 0350 0.450 -- -Duct Name: SR -120, Supplies: Master RR, Fittings: 2 -I, 4 -G, Effective Length: 73.6 Runot 0.0003 7 206 0.002 Up. ST -270 55 5.4 0.012 0.007 Rnd 16,0 7.7 57.6 0.009 Presize 55 29.3 0341 0.459 -- -Duct Name: ST -148, Feeds Into: Unf basement, Effective Length: 4.8 Trunk 0.0003 12.9 142 0.000 Up: ST -270 55 14 0.003 0.000 Rect 4.8 10 0.0 0.000 Presize 138 19.3 0.350 0.450 S Y :\ .,. \Plan 506 .rhv Tuesday, February 18, 2014, 3:19 PM -- -Duct Name. SR-1 Supplies. WC, Fittings. 2 -1, 4 -G, Effective Length. 27.2 I Runout 0,0003 3 102 0.001 Up: ST-290 120 2.4 0.010 0.001 i Rnd 11.8 33 10.3 0.003 Presize 5 9.3 0348 0.452 _- -.Duct Name: ST -150, Feeds Into: Unf basement, Effective Length: 1.5 € Trunk 0.0003 15.2 285 0.000 Up: ST -200 55 20 0.009 0.000 I Rect 1.5 10 0.0 0,000 Presize 395 7m5 0351 0.449 --- Duct Name: SR -140, Supplies: Master Bath, Fittings. 2 -1, -H, Effective Length: 40.5 Runout 0.0003 5 183 0.002 Up. SMT -100 55 19 0.015 0.004 Rnd 15.0 5.5 25.5 0.006 Presize 25 19.6 0348 0.452 --- Duct Name: SR -150, Supplies: Master Bath, Fittings: 2 -1, 4 -1°l, Effective Length: 40.5 Runout 0.0003 5 183 0.002 Up: T -350 55 3.9 0.015 0.004 Rnd 15.0 5.5 25.5 0.006 Presize 25 10.6 0.346 0.454 --- Duct Name: ST -160, Feeds Into: Unf basement, Effective Length: 3.3 Trunk 0.0003 15.2 415 0.001 I Up: ST -350 55 20 0.019 0.000 I Rect 3.3 10 0.0 0.001 Presize 577 16.7 0.351 0.440 i --- Duct Name: SR -160, Supplies: WIC, Fittings: 2-1,4-G, Effective Length: 47.3 Runout 0.0003 4 140 0.002 i Up: ST -110 128 3.1 0.013 0.004 Rnd 16.2 4.4 31.1 0.006 i Presize 13 16.9 0.348 0.452 -- -Duct Name:: ST -170, Feeds Into; Unf basement Effective Length. 2.0 Trunk 0.0003 15.2 298 0.000 Up: ST -110 128 20 0,000 0.000 Rect 2;0 10 0,0 0.000 Presize 414 10 0354 0.446 -- -Duct :Name. SR -170, Supplies: SR 2, Fittings. 2-1,4-G, Effective Length. 56.5 Runout 0.0003 6 178 0.002 Up: ST -400 55 4.7 0.011 0.005 Rnd 16.2 6.6 40.3 0.006 Presize 35 25.4 0347 0.453 Y:\ ...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM _ w O W - --Duct Name: ST -180, Feeds Into: Unf basement; Effective Length: 2.0 Trunk 0.0003 15.2 235 0:000 Up: ST -190 55 20 0.007 0.000 Rect 2.0 10 0.0 0.000 Presize 327 10 0.353 0.447 -w -Duct Name: ST -190, needs Into: Unf basement, Effective Length. 0.7 Tank 0.0003 15.2 235 OMO Up: ST -100 55 20 0.007 0.000 Rect 0.7 10 0.0 0.000 Presize 327 3.3 0.354 0,446 -- -Duct Name: ST -200, Feeds Into: Unf basement, Effective Length. 9.3 Trunk 0.0003 15.2 210 0.001 Up: ST -180 55 20 0.006 0.000 Rect 9.3 10 0.0 0.001 Presize 292 46.7 0353 0.447 -Duct Name: SR -180, Supplies: BR 2, Fittings: 2-1,4-H, 8-A2,8-A2, Effective Length: 69.0 Runout 0.0003 6 178 0.003 Up: ST -180 55 4.7 0.011 0.005 Rnd 23.2 6.6 45.9 0.008 Presize 35 36.4 0.346 0.454 -- -Duct Name: SR -190, Supplies: Study, Fittings. 2 -1, 4 -G, 8 -A2, 8-A2, Effective Length: 72.6 Runout 0.0003 6 224 0.003 Up: ST -220 55 4.7 0.017 0.009 Rnd 18.3 6.6 54.2 0.012 Presize 44 28.8 0337 0.463 --- Duct Name: SR -200; Supplies: Study, Fittings. -1, 4 -G, Effective Length: 67.9 Runout 0.0003 6 224 0.003 Up: ST-380 55 4.7 0.017 0.008 Rnd 19.5 6.6 48.4 0.011 Presize 44 30.6 0,338 0.462 -- -Duct Name: ST -210, Feeds Into: Unf basement, Effective Length: 1.2 Trunk 0.0003 9.8 144 0.000 Up: ST -380 55 8 0,005 0.000 Rect 1,2 10 0.0 0.000 Presize 80 3.5 0.350 0.450 --- Duct Name: SR -210, Supplies: Entry, Fittings: 2-1,41-1, Effective Length: 23.0 Runout 0.0003 5 279 0.000 Up: ST -210 128 3.9 0.028 0:007 Rnd 0.0 5.5 23.0 0.007 Presize 38 0 0.343 0.457 Y :1... \Plan 5062.rhv t. '• s ° -- -Duct Name: ST -220, Feeds Into: Unf basement, Effective length: 1.0 Trunk 0.0003 9.8 79 0.000 i Up: ST -210 55 8 0.002 0.000 Rect 1.0 10 0.0 0.000 Presize 44 3 0.380 0.450 r -- -Duct Name: SR -220, Supplies: Bath 3, Fittings: 2 -1, 4 -, Effective Length: 44.7 Runout 0.0003 4 218 0.005 i Up: ST -370 55 3,1 0.027 0.007 Rnd 10.5 4.4 252 0.012 Presize 19 20.4 0.330 0.461 -- -Duct Name: ST -230, Feeds Into: Unf basement, Effective Length: 1.3 Trunk 0.0003 9.8 302 0.000 Up: ST -370 128 8 0.016 0.000 Rect 1.3 10 0.0 0.000 Presize 168 4 0.351 0.419 -- -Duct Name: SR -230 Supplies: RR 3, Fittings: 2-1,4-G, Effective Length: 77.0 Runout 0.0003 7 202 0.002 Up: ST -360 55 5.4 0.012 x 0.007 Rnd 19.7 71 57.4 0.009 Presize 54 36 0343 0.457 -- -Duct Name: ST -240, Feeds Into: Unf basement, Effective Length: 7.2 ! Trunk 0.0003 12.9 213 0.000 Up: ST -360 128 14 0.006 0.000 Rect 7.2 10 0.0 0.000 r Presize 207 28.7 0.351 0.449 --- Duct Name: SR -240, Supplies: Halt, Fittings: 2.1, 4 -G, Effective Length: 44.1 Runout 0.0003 5 161 0.001 Up: ST -310 55 3.9 0.012 0.005 Rnd 5.5 5.5 38.6 0.005 i Presize 22 7.2 0.347 0.453 -$ -Duct Name: ST -250, Feeds Into- basement, Effective Length: 1.8 Trunk 0.0003 12.9 256 0.000 ! Up. ST -310 55 14 0.009 0.000 Rect 1.8 10 0.0 0.000 , Presize 249 7.3 0.352 0.448 - -Duct Name: SR -250, Supplies: Dieting, Fittings: 2-1,4-H, 8-A2,8-A2, Effective Length: 91.3 Runout 0.0003 7 161 0.003 Up: ST -120 55 5.4 0.008 0.004 Rnd 40.2 7.7 51.1 0.007 Presize 43 73.6 0.347 0.453 Y:\...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 Pl -- -Duct Name. ST -260, Feeds Into. Unf basement, Effective Length* 3.5 0.0003 7 Trunk 0.0003 15,2 451 0.001 Up; ST -120 55 20 0.022 0.000 Rect 3.5 10 0.0 0,061 Presize 627 17.5 0.353 0.447 } -- -Duct Name. SR -260, Supplies. Kitchen/Nook, Fittings: 2-1,4-H, Effective Length: 60.6 Runout 0.0003 8 324 0.002 ? Up: ST -300 55 62 0.022 0.012 Rnd 7.7 8.7 52.9 0.014 Presize 113 16.1 0.337 0.463 -w -Duct acne: ST -270, Feeds Into: Unf basement, Effective Length: 6.8 ? Trunk 0.0003 12.9 199 O.00O Up: ST -300 55 14 0.006 0.000 Rect 6.8 10 0,0 0.000 Presize 193 27.3 0350 0.450 -- -Duct dame: SR -270, Supplies: Kitchen/Nook, Fittings: 2-1,4-G, Effective Length: 94.1 Runout 0.0003 8 324 0.006 Ups ST -160 55 6.2 0.022 0.015 z Rnd 27.3 8.7 66.7 0.021 Presize 113 57.2 0.330 0.470 t -- -Duct Name. ST -280, Feeds Into* Unf basement, Effective Length. 4.8 Trunk 0.0003 15.2 334 0.001 Up. ST -160 55 20 0.013 0.000 Rect 4.8 10 0.0 0.001 Presize 464 24x2 0.351 0.449 -- -Duct Name. SR -280, Supplies. Great Room, Fittings. 2 -1, 4 -tom, 8-A2, 8 -A2, Effective Length. 110.4 Runout 0.0003 7 243 0.006 Up. ST -280 55 5.4 0.016 0,012 Rnd 35.8 7.7 74.6 0.018 ' Presize 65 65.7 0.333 0.467 F -- -Duct Name. ST -290, Feeds Into* Unf basement, Effective Length, 0.8 Trunk 0.0003 15.2 287 0.000 Up. ST -280 55 20 0.010 O.00O Rect 0.8 10 0.0 0.0 0- Presize 399 4.2 0.351 0.449 Runout 0.0003 7 243 0.007 Up. ST -340 55 5.4 0.016 0.011 Rnd 45.8 7.7 673 0.018 Presize 65 84 0.332 0468 Y.t .... \Plan 5062,rhv Tuesday, February 18, 2014, 3.19 PM --- Duct Name: SR -300, Supplies. Laundry, Fittings. 2- 1, >4 -G, Effective Length: 36.7 I Runout 0.0003 4 332 0.003 Up: ST -200 128 3.1 0.051 0.016 Rnd 5.8 4.4 30.8 0.019 Presize 29 6.1 0334 0.466 -- -Duct Name: ST -310, Feeds Inter: L1nf basement, Effective Length: 7.2 Runout Trunk OM03 12.9 279 0.001 Up: ST -200 55 14 0.011 OMO Rect 7.2 10 0.0 0.001 Presize 271 28.7 0352 0.446 -- -Duct Name: SR -310, Supplies: Seth 2, Fitting. 4 -G, Effective Length: 10.2 Runout OM 03 3 61 0.000 Up: ST -170 55 2.4 0.005 OMO Rnd 3.7 3.3 6. 5 0.000 Presize 3 2.9 0..353 0.347 -- -Duct Name: ST -320, Feeds Inter: llnf basement, Effective length. 1. Effective Length: 5.8 Trunk 0.0003 15.2 297 0.000 Up: T -170 128 20 0.009 0.000 Rect 1.3 10 0.0 0.000 Presize 412 6.7 0.354 0.446 - _.Duct Name: SR -320, Supplies: PDR, Fittings: 2-1,4-G, Effective Length: 21.2 Runout 0.0003 3 61 OMO Up: ST -230 55 2.4 0.005 0.001 Rnd 6.5 3.3 14.7 0.011 Presize 3 5.1 0.350 0.450 €, -- -Duct Name: ST -330, Feeds Inter: Llnf basement, Effective Length: 5.8 Trunk 0.0003 9.8 299 0.001 Up: ST -230 128 8 0.015 0.000 Rect 5.8 10 0.0 0.0+1 Presize 166 17.5 0.350 0.450 E ___Duct Name* SR -330, Supplies, Rec Roam, Fittings: 2-1,4-AD, 8-A2,8-A2, Effective Length: 109.5 Runout 0.0003 7 172 0.003 Up: ST -150 128 5.4 0.008 0.005 I Rnd 41.0 7.7 68.5 0.009 Presize 46 75.1 0.342 0.458 YA ...\Plan 5062.rhv Tuesday, February 18, 2014,3:19 PM g --duct Name: ST -300, Feeds Inter: Unf basement, Effective Length. 3.2 1 Trunk 0.0003 15,2 220 0.0oo Up: ST -340 55 20 0.006 0.000 Rect 3.2 10 0.0 OMO ! Presize 306 15.8 0.350 OA50 1 -- -Duct Name: ST -340, Feeds Into: Unt basement, Effective Length: 0.8 Trunk 00003 15.2 267 0.000 Up: ST -150 55 20 0.003 0.000 Rest 0.8 10 0.0 0.000 Presize 371 42 0.351 0.449 -- -Duct Name: SR-340, Supplies: Rec Room, Fittings. 2-1,4-AD, Effective Length: 85.3 RUnout 0.0003 7 172 0,003 Up: ST -260 126 5.4 0.003 0.004 f Fend 31.7 7.7 517 0.007 Presize 46 58 0.347 0.453 -- -Duct e: ST -350, Feeds Into* Unf basement, Effective Length: 6.3 Trunk 0.0003 15.2 433 0.001 U p: ST -260 55 20 0.020 0.000 Rect 6.3 10 0.0 0.001 Presize 602 31.7 0.352 0.448 -- -Duct N ame: SR - 350, Supplies: Rath 4, Fittings: 2 -1, 4 -AD, Effective Length: 28 Runout 0.0003 3 122 0.001 Up. ST -250 126 2.4 0.013 0.002 Find 112 3.3 17,3 0.004 Presize 6 8.8 0.346 0.452 - -Duct Name: ST -360, Feeds Into: Unt basement, Effective Length: 3.3 � Trunk 0,0003 12.0 256 0.000 Up. ST -250 55 14 0.009 0.000 I Rect 33 10 0.0 0.000 Presize 249 13.3 0.352 0.448 --- Duct Name: SR -360, Supplies: BR 4, Fittings: 2-1,4-AD, Effective Length: 55.7 Runout 0.0003 6 112 0,001 Up: ST -240 126 41 0,0M5 0.002 s Rnd 192 6.6 36.5 0.003 l Presize 22 30.1 0.349 0.451 { --Duct Name: ST -370, Feeds Into: Unf basement, Effective Length: 1.5 f Trunk 0.0003 12.9 190 0.000 Up: ST -240 128 14 0.005 0.000 Rect 1.5 10 0.0 0.000 1 Presize 185 _ 6 0.351 _ 0.449 1 -- -Duct Name: SR -370, Supplies: Unf basement, Fittings: 2-1,4-AD, Effective Length: 72.4 Runout 0.0003 6 357 O M6 Up: ST -330 128 4.7 0.035 0.019 Rnd 162 6.6 56.2 0.025 Presize 70 25.4 0325 0.475 i 3 YA ... \Plan 5062.rhv 1 Tuesday, February 18, 2014, 3 :19 P I Y \ ... \Plan 506 ,rhv Tuesday, February 16, 2014, 3:19 PM `Smallest [runK tame er: 011 Z) I - I ou Smallest runout diameter: 3 ' SR -130 Supply fan external static p ressure: 0.800 Supply fan device pressure losses: 0.300 Supply fan static pressure available: 0.500 Runout maximum cumulative static pressure loss: 0.475 SR -370 Return loss added to supply: 0.113 Total effective length of return ft.): 472.7 Low Total effective length of supply { ft.): 258.9 SR -370 Overall total effective length ( ft.): 741.E Low to SR -370 Design overall friction rate per 100 ft.. 0.087 (Available S" x 100 l TEL) 4 System duct surface area (No Scenario). 1379x1 Total system duct surface area: 1279.1 € t Y 1 Y.\ ...1 'l n 5052.thv Tuesday, February 15, 2014, :19 PM -- -Du N ame: R T -100, Feeds From: Unf basement, Fitting 5 -H1 5 -L, Effective Length: 258.2 Trunk 0,0003 18.6 615 0.000 U: Fan 75 25 0.029 0.075 Rect 0.5 12 257.7 0.075 Presize 1,266 3,1 -0.038 0.113 -- -Duct N T -110, Feeds From: Unf basement, Effective Length: 0.5 0.429 � Trunk 0.0003 18.6 345 4.004 Up: RMT -140 75 25 0.010 0.000 Rect 0.5 12 0.0 4.444 Presize 718 3.1 -0.037 0.434 - - -Duct Nerve: RT -120, Feeds From: Unf basement, Effective Length: 2.7 Trunk 4.4443 12.9 369 0.000 Up: RT -140 75 14 4.417 0.000 Rect 2.7 10 4x4 4.444 Presize 359 10,7 -4.437 0.429 -- -Du Name: RT -130, Feeds From: Unf basement, Effective Length: 2.7 Trunk 4.4443 12.9 369 4.040 Up: RT -110 75 14 4.417 4.004 Rect 2.7 10 0.0 4.044 Presize 359 14.7 -0.437 4.034 -- -tw Name: RT -140, Feed F rom: Unf basement, Effe Length: 1.2 i Trunk 4.4443 18.6 172 0.000 Up: RT -110 75 25 4:443 0.000 Rect 1.2 12 0.0 4.400 Presize 359 72 4437 4:430 -- -Duct Name: RT -150, Feeds From: Unf basement, Effe ctive Length: 1.0 Trunk 0.0003 18.6 274 0.000 U p: RMT -144 75 25 4.447 4.404 Rect 1.0 12 0.0 4.040 Presize 574 6.2 -4.437 4.112 -- -Duct Name- RT - 160, Fe e ds From: Unf basement, Effective Length: 12.8 Trunk 4.4443 10 616 4.447 Up. RT -150 75 7.8 4.452 4,444 Rnd 12:8 14.9 0.0 4.447 Presize 336 33.6 -4.031 0.106 Runout 4.0003 12.9 369 0,.004 U: RT -120 75 14 4.017 0,029 Rect 0.5 10 169.4 0.429 Presize 359 ' 2 -0.008 0.420 YA ...1Plan 5062,rbv Tuesday, February 18, 2014, :19 PM -- -Duct Name: Low, Returns From: Kitchen /Nook, Fittings: 6 -B, 6 -H, 8 -133C, Effective Length: 170.0 Runout 0.0003 12.9 369 0.000 Up: RT -130 75 14 0.017 0.029 Rect O.6 10 159.4 0.029 Presize 359 2.4 _0.003 0.029 1 Trunk 0.0003 9.8 --- Duct Name. RT -170, Feeds From: Unf basement, Effective Length; 5.7 0.000 Up: RT -180 Trunk 0.0003 9.8 421 0.002 Up: RT -150 75 8 0.031 0.000 Rect 5.7 10 0.0 0.002 Presize 234 17 4036 0.027 - --Duct Name: RT-180, Feeds rem of basement, Effective Length: 6.7 75 f Trunk 0.0003 9.8 421 0.002 Up: RT -170 75 8 0.031 0.000 Rect 6.7 10 0.0 0.002 Presize 234 20 µ0.034 0.025 P -- -Duct Name: Low, Returns From: Rec Room, Fittings: 6 -C, 6 -G, 8-A2, Effective Length: 200.7 8 Runout 0.0003 12.9 346 0.000 Up: RT -160 75 14 0.015 0.031 Rect 0.5 10 200.2 0.031 Presize 336 2 0.000 0.031 Runout 0.0003 7 292 0.000 € Up: RT -180 75 5.4 0.022 0.008 Rnd 0.3 7.7 37.6 0.008 Presize 78 O.6 _0.026 0.005 -- -Duct Name: RT -190, Feeds From: Unf basement, Effective Length: 1.5 Trunk 0.0003 9.8 281 0.000 Up: RT -180 75 8 0.015 0.000 Rect 1.5 10 0.0 0.000 Presize 156 4.5 -0,033 0.025 -- -Duct Name. Mstr Nigh, Returns From: Master RR, Fittings. 6 -C, 6 -G, 12 -R, Effective Length. 50.9 Runout 0.0003 7 292 0.000 Up: RT -190 75 5.4 0.022 0.011 Rnd 03 7.7 50.5 0.011 Presize 78 0.6 -0.023 0.011 - --Duct Name: RT -200; Feeds From. Unf basement, Effective Length: 1.0 s Trunk 0.0003 9.8 140 0.000 Up: RT -190 75 8 0,004 0.000 Rect 1.0 10 0.0 0.000 I Presize 78 3 -0.033 0.025 YA ...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Y.\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM .,, Rear Entry Door: Door-R=2.8 21.4 526 6 168 1 68 R6.2 Moor: Door -U =.161 24 267 0 85 85 I 151315 -Ow -9: Wall- 903.2 3,115 6 39 39 Basement R11 - 9. Wall - Basement, Custom, R - 11 1828.3 6,641 0 89 89 Basement wall s 12F -Osw. Wall -game, R -21 insulation in 2 x 6 stud cavity„ 2140.9 9,604 0 1,574 1,574 no board insulation, siding finish, wood studs 16BP38. Roof /Ceiling -Under Attic with Insulation on Attic 2757.5 4,947 0 3,295 3,295 Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt 3 Shingles or Bark Metal, Tar and Gravel or Membrane, R -38 insulation 21 A -32. Floor - Basement, Concrete slab, any thickness, 2 2749.9 3,795 0 0 0 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 32' wide 11 .... . , e._ , ... ..... .. .. _ ,,. . .... ._ .. .... ..._ ........... j .. »... ,.. Subtotals for structure. 38,242 0 17,895 17,895 People. 5 1,000 1,150 2,150 Equipment. 0 1,200 1,200 Lighting. 0 0 0 Ductwork, 0 0 0 0 Infiltration. Winter CFM. 132, Summer CFM. 132 8,188 2,865 1,897 -968 Ventilation. Winter CFM. 0, Summer CFM: 0 0 0 0 0 Humidification (Winter) 4..90 gal/day : 1,797 0 0 0 AFC} Excursion: _.. ...,�..�_ ,..._,n.., __._.. _.�. .n_._ _.� w......�........ ...... ....... _.. . 0 �. ...,..,. _ 0 ..... e .. e._....._....... 2,441 _ _.... 2,441 ... ..._.._._ Total Building Load Totals. 48,227 -1,865 24,583 22,718 f Total Building Supply CFM: 1,100 CFM Per Square ft.: 0.200 Square ff. of Room Area: 5,507 Square ft. Per Ton: 2,909 x Volume (ft of Cond. Space: 53,005 Total Heating Required Including Ventilation Air: 48,227 Btuh 48.227 MBH Total Sensible Gain: 24,583 Btuh 100 % Total Latent Gain: -1,865 Btuh 0 % Total Cooling Required Including Ventilation Air: 24,583 Btuh 2.05 Tors (Based On Sensible + Latent + ' • N HOME a T. s . • w # t •• Y:1...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 P �� i "• q >ve 1 � .. m^ 1 .+.ylm^ tt. " ltl 1. *' 1j " t �.� t'.'itl' ,.. P����" '�,t`...?�i h'�`"' 4i` � �1 �^.t\ � � ...r .. � �. E 1 ..0 i �r.i c ..l �ttl >i �., r -o t. a1 1 ....,,,~• t 1 1 ., ll l�!, t 1�.. � 1',a �t a,�Y�l,. 1� 1 t,..tx11 Ya . \.,1. `1 s �, l.. ` y*' l �''�:,,'rliul�l'yx „ . . n. W'- �' aatuw. 5. �; S, �il, 1aaa„ U„ iaa,.. 1�watA, aaw" 1S11Viaava' .alit»'11uuSx1"'r�x'�'1'�`U�'", a. . ur; aww30�; axi�a� .r'�:.at�S:,",�'m#ws,a>?.:utt,�, Wvlul uii „"b,- ,a�v acs- 53�U. a�\ U v��a�l3u ;�":ua1: ,, xisyraa>�`�at Cooling E E System Type. Standard Air Conditioner Outdoor Model: CA13NA036 * * * {A,R} Indoor Model. CNPV *4221 At. *-rTDR Tradename. 13 SEER PURON AC Outdoor Manufacturer. CARRIER AIR CONDITIONING r ANRI Reference No.: 6395468 Nominal Capacity. 33000 Y Efficiency. 13 SEER Heating System Type. Natural Gas Furnace ` Model. 55SC13080S1 - -0 ` Tradename. Carrier Manufacturer: CARRIER CORPORATION Description: Natural Gas or Propane Furnace 1 Capacity. 75000 Efficiency. 1 I 52..1 AFUF { 2 3 k 1 2 P 3 i 1 4 #} E i 1 I I i 3 I p i F � 1 f } s 3 Y:\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3.19 PM Room Length: 839.1 ft. System Number: 1 Room Width: 1.0 ft. Zone Number: 1 3.6 Area: 339.9 sq.ft. Supply Air: 91 CFM Meiling Freight: 10.2 -ft. Supply Air Changes. 0.6 AC/hr Volume: 8,530.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers :? 3 NW-GIs-Atrium shgc -0.33 O %S Actual Winter Vent.: 0 CM 342 25.6 0 Percent of Supply.: 0 % 0.310 21.4 342 Actual Summer Vent.:: 0 CFM Floor-21 A -2 1 X 839.1 839.1 0,020 Percent of Supply: 0 % 0 0 Subtotals for Structure. Actual Winter Infil.: 4 CM 4,326 0 Actual Summer Infil.: 4 CFM 10.2 S- Wall - 15815 -Ow -9 14.41 X 146 0.047 3.6 523 0.1 0 10 10.2 W- Wall - 15815 -0w -9 17 X 10.2 158.9 0.047 3.3 522 0.0 0 3 NW-GIs-Atrium shgc -0.33 O %S 16 0 310 21.4 342 25.6 0 409 S -Cls- Atrium shgc -0.33 0 %S 16 0.310 21.4 342 30.8 0 492 Floor-21 A -2 1 X 839.1 839.1 0,020 1.4 1,158 0.0 0 0 Subtotals for Structure. 4,326 0 935 Infil.. Wan.. 4.1, Sum.: 4.1 90 2.853 256 0.657 -90 59 A D Excursion 110 Room Totals. 4,582 -90 1,104 ; Y:\ ...\Plan 5062.rhv Tuesday, February 18, 2014, 3 :19 P Room Length: 5.3 'tt. System Number: 1 . _ �.��.. ..._ .. 265 Room Width: 9.7 ft. Zone Number: 1 4 Area: 52.0 sq.ft. Supply Air: 6 CFM Ceiling Height: 10.2 ft. Supply Air Changes: 0.6 AG/hr ! Volume: 524.0 cuft Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.. 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % € Actual Winter lnfil.: 0 CFM I Actual Summer lnfil.: 0 CFM Floor-21A-32 1 X 51.6 0.020 1.4 71 0 0 _. �_...,_ ....... _._.e�...... 0 _ .�" 0 --.,._ ..,,._ _._. . Subtotals for Structure: . _ �.��.. ..._ .. 265 0 , 4 infil . Win.: 0.3, Sure.. 0.3 7 2.021 19 0 615 7 4 AEC► Excursion: Room Totals: 264 _7 9 I I a f i 5 i I i s E y i E 3 2 1 I (:\ ...\Plan 5062.rhv Tuesday, February 16, 2014, 3:19 PM Rohm Length: 14.7 ft. System Number: 1 16 0.310 21.4 342 25.6 Room Width: 133 ft. Zone Number: 1 # Area: 196.0 sg.ft. Supply Air: 22 CFM Ceiling Height: 10.2 ft. Supply Air Changes: 0.7 AC/hr Volume : 1,988.0 cu.ft. Reef. Vent. CIg: 0 CM Number of Registers: 1 Actual Winter Vent.: 0 CFM # Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM f, Percent of Supply: 0 % Actual Winter Infil.: 1 CFM Actual Summer Infil.: 1 CFM 10.2 NW- GIs - Atrium shgc- 0.330 %S 16 0.310 21.4 342 25.6 0 409 Floor 1 X 195.6 1 111111-1 . 195.6 0.020 1.4 270 0.0 0 f? Subtotals for Structure: 1,049 0 410 Infil.: Win.: 0.8, Sum.: 0.8 18 2.849 51 0.670 -18 12 , AEC} Excursion: r _ _ .. �... ` I Room Totals: 1,100 -18 469 i i i i r 3 i 1 J l E 1 i EE E y 1 f 1 3 e.\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3 :19 PM Room Length: 1,663.8 ft. System Number: 1 Room Width: 1.0 ft. Zone Number: 1 3.7 Area: 1,664.0 sq.ft. Supply Air: 211 CFM Ceiling Haight: 102 ft. Supply Air Changes: 0.7 AC/hr Volume: ` 16,915.0 cu.ft. Reef. Vent. Clg: 0 CFM Number of Registers: 3 10.2 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % 0.051 17 310 Actual Summer Vent.: 0 CFM 10.2 Percent of Supply: 0 % SE- Wall - Basement R11 -9 20 X Actual Winter Infil.: 10 CFM 744 0.1 0 Actual Summer Infil.: 10 CFM X 10.2 NE- Wall - Basement R11 -9 12.5 127A 0.051 3.7 465 OA 0 8 } 10.2 SE- Wall - Basement R11 -9 5 X 50.3 0.051 3.7 136 0.1 0 3 F 10.2 NE -Wall- Basement R11 -9 8.3 X 84.7 0.051 17 310 0.1 0 10.2 SE- Wall - Basement R11 -9 20 X 2014 0.051 3.7 744 0.1 0 12 ! 10.2 NE -WalI- Basement R1 1-9 29 X 204.0 0,051 3.7 1,079 0.1 0 18 10.2 ; SE- Wall - Basement R11 -949.8 474.8 0.051 3.6 1,705 0.0 0 14 g X 10.2 SW-Wall-Basement R11 -9 18 X 167.1 0.051 3.6 595 0.0 0 3 10.2 NW- Wall - Basement R11 -9 14.3 1451 0.051 3.7 533 0.1 0 9 X 10.2 SW- Wall - Basement R11 -9 14.8 150.8 0.051 3.7 552 0.1 0 9 X 10.2 SE- GIs- Atrium shgc -0.33 0 %S 16 0.310 21,4 342 30.8 0 492 I SE- Cis - Atrium shgc °0.33 O %S 16 0.310 21.4 342 30.8 0 492 SW -CIs- Atrium hgc -0.33 O %S 16 0.310 21,4 342 30,8 0 492 Floor -21A -2 1 X 1663.8 _ 1663.8 0.020 1.4 2,296 0,0 0 0 Subtotals for Structure: 9,963 0 1,565 Infil.: Win.: 10.4, Sum.: 10.4 225 2.856 643 0.662 -225 149 AEf.7 Excursion. _ 11 11 _ 1 111 1 Room Totals: 10,606 -225 1,903 Y:1 ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Room Length: 14.3 ft. System Number: , 1 0.7- Room Width: 17.2- ft, Zone Number: 1 4.5 Area: 246.0 sg.ft. Supply Air: 129 CFM Ceiling Height. 9.1 ft. Supply Air Changes: 3.5 AC /hr { Volume: 2,235.O cuff. Rea{. Vent, Cig: 0 CFM Number of Registers: 2 ; Actual Winter Vent.: 0 CFM 535 30.7 0 Percent of Supply.: 0 % 0.0 6 1.8 441 Actual Sumner Vent.: 0 CFM Subtotals for Structure: Percent of Supply: 0 % 0 2,100 Infil.: Win.: 19.2, Sum.: 19.2 Actual Winter Infil.: 19 CFM 1,189 0.663 -416 Actual Summer Infil.: 19 CFM S - Wall- 12F -Osw 14.3'X 9.1 130.1 0.065 4.5 584 0.7- 0 96 SW -WaU-1 2F-Osw 17.2 X 9.1 105.9 0.065 4.5 475 0.7 0 7 8 SW -Gals- Atrium hg •.0 33 O%S 12.5 0.310 21.4 267 30.7 0 384 SW-GIs-Atrium shgc -0.33 O %S 12.5 0.310 21.4 267 30.7 0 384 SW-GIs-Atrium shgc -0.33 O °IBS 25 0.310 21.4 535 30.7 0 768 UP - C . _ . e l . 1613 - 33 246.1 C 1 __...., . . 246.1 0.0 6 1.8 441 1.2 0 294 Subtotals for Structure: 3,153 0 2,100 Infil.: Win.: 19.2, Sum.: 19.2 416 2:857 1,189 0.663 -416 276 j AEC} Excursion 287 People: 2(3O Ialper, 230 ndm _ ._ ._ .. ._ ��_ w.. ..,_._ .. _ . A.wv _.. _ _ 234 Room Totals: 4,342 -216 2,893 i i E i J i Y :\ ... \Plan 5062.rhv Tuesday, February 18, 2014, :19 PM- ,, Room Length: 484.3 ft. System Number: 1 0 Roam Width: 1.0 ft. ;done !Number: 1 301 Area: 484.0 sq,ft. Supply Air: 227 CFM Ceiling Height: 9.1 ft Supply Air Changes: 3.1 AC/hr Volume. 4,399.0 cu t, Req. Vent. Clg. 0 CFM l Number of Registers. 2 0.664 Actual Winter Vents 0 CFM Percent of Supply.. 0 % Ft ipm nt _._.. w. _.; .__._ _ Actual Summer Vent. r_.. CFM 1,200 � Room Totals. Percent of Supply: 0 % r -275 5,067 2 l 3 f Z I lI 3 y 1 Actual Winter Infil.. 13 CFM Actual Summer Infil.. 13 CFM SW- Wall- 12F -Osw 14.9 X 9.1 54.8 0.065 4.5 246 0.7 0 40 € SW -CPIs- ,Atrium shcgc -0;33 O ASS 80 0.310 21.4 1,711 301 8 2,459 l UP- Cell- 1613-38 484.3 X 1 .. � . 484.3 0.026 1.8 869 1 . 2 _: _ .. 0 .. Vii' 1 Subtotals for Structure: 3,457 0 3,131 Infil.: Win.: 12.7, Sure.: 12.7 275 2.856 787 0.664 -275 183 AED Excursion: 503 Ft ipm nt _._.. w. _.; .__._ _ ._.. r_.. ._ 0 1,200 � Room Totals. 4,244" -275 5,067 2 l 3 f Z I lI 3 y 1 Y:\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3 :19 PM Room length: 12.3 ft, System Number: 1 172.7 C1.C126 1.6 310 1.2 Room Width: 14.13 ft. Zone Number: 1 786 Area: 173.0 sq.ft. Supply Air: 43 CF Ceiling Height: 9.1 ft. Supply Air Changes: 1.6 AC/hr Volume: 1,56&0 cuft Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 5 CFM Actual Summer Infil.: 5 CFM Nil -CPIs- Atrium s gc -0.33 O%S 20 01.310 21.4 428 25.5 , 0 511 U ' -Cei1- 1613-33 172.7 X 1 172.7 C1.C126 1.6 310 1.2 6 207 Subtotals for Structure: 1,156 0 786 Infil.: Win.: 5. 2, Sum.: 5.2 112 2.353 3213 6.661 -112 74 AED Excursion: 5 Room Totals: 1,476 112 955 Y:\ ... \Plan 5062.rhv Tuesday, February 18, 2614, 3:19 PM ,: Room Length: 3064 ft, System Number: 1 Room Width: 1.0 ft. Zone Number. 1 Area: 306,0 sq.ft. Supply Air: 166 CFM Ceiling sleight 9.1 ft. Supply Air Changes: 16 AC/hr Volume: 2,7810 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 3 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM r P Percent of Supply: 0 % Actual Winter lnfl.: 19 CFM Actual Summer lnfil.: 19 CFM 7 NW-Wall- 1 2F-Osw 14.3 X 9.1 109.8 0.066 4.5 492 01 0 81 € SF- Wall- 12F -Osw 14.3 X 9.1 130.1 0.065 ' 4.5 584 0.7 0 96 SW- Wall- 12F -sw 18 X 9.1 108.4 03.965 4.5 486 0.7 0 80 NW- Gis- Atrium shgc -0:33 O %S 20 0310 21.4 428 25.6 0 511 SW- GIs - Atrium shgc -0.33 O %S 15 0.:310 21.4 321 30.7 0 461 r SW- Gis- Atrium shgc -0.33 O %S 15 0.310 21.4 321 30.7 0 461 SW -GIs- Atrium shgc -0:33 O %S 25 0.310 21.4 535 30.7 0 768 UP -Ceil- 1613 -38 306.4 X 1 306.4 0.026 1.8 550 1.2 0 366 Subtotals for Structure. 3,717 0 2,824 lnfil.: Win.: 19.5, Sum.: 19.5 423 2.856 1,209 0.661 -423 280 AFD Excursion: 368 People: 200 latter, 230 sen /per: _ _ 1 _ _ _ _... _ 200 . 2301 Room Totals: 4,926 -223 3,702 3 k 3 1 1 i Y :\ ... \Plan 5O62.rhv Tuesday, February 18, 2014, 3:19 PM 3 .5 ft. System Number: ; 5.5 fit. Zone Number: 15.0 sq.ft. , Supply Air: .1 ft. Supply Air Changes: 175.0 cuft Req. Vent. Clq: 1 0 Actual Winter Vent.: 1 CFM Percent of Supply.: CFM Actual Summer Vent.: Percent of Supply: Actual W inter Infil.: Actual Summer Infil.: 1 l _ _ .. Subtotals for Structure: CFM 1.6 AC/hr 0 CFM ! 0 CFM 0 % 0 CFM 0 °lam 1 CFM 1 CFM U -C il- 1613 - 1 1 1 � . _ _ 0.026 _ ._ __ �_ 1.8 _� 1. M _ _ .. Subtotals for Structure: 173 0 4 Infil.: Win.: 1.5, Sure.: 1.5 32 2.363 91 0.661 -32 21 AED Excursion: _ �. _ _ : _ ._ _ ? Room Totals: 269 -32 74 i c i I i l i l l i I 1 i i Y :\...\Plan 5062.rhv Tuesday, February 1, 2014, 3 :19 PM Room Length: 291.2 'ft. System Number: Room Width: 1.0 ft. Zone Number: - Area: 291.0 sq.ft. Supply Air: Ceiling Height: 9,1 ft, Supply Air Changes: Volume: 2,645.0 cu.ft. Req. Vent. Clg: Number of Registers: 2 Actual Winter Vent,: 1,322 0 Percent of Supply.: lnfil.. Win.. 5.4, Sum.. 5.4 118 2.855 Actual Summer Vent.: 0.661 -118 78 Percent of Supply: ryu . , . _ Actual Winter lnfil.: -11 1 Room Totals, F t 1 V Actual Summer lnfil.: SF- CPIs - Atrium shgc -0.33 O %S 8 0.310 21.4 171 49 CFM 1.1 AC/hr i 0 CFM 0 CFM 0 ta f " 0 CFM i 0 �'�ce 1 5 CFM 5 CFM SF- CPIs - Atrium shgc -0.33 O %S 8 0.310 21.4 171 30.8 0 246 I SF #Cl °Atrium shgc -0.33 O %S 8 0.310 21.4 171 36.6 0 246 UP -Ceil- 1613 -38 291.2 X 1 291.2 ............ 0.026 1.8 ...... 522 1.2 0 348 Subtotals for Structure. 1,322 0 915 lnfil.. Win.. 5.4, Sum.. 5.4 118 2.855 337 0.661 -118 78 AFC} Excursion. ryu . , . _ _ . -11 1 Room Totals, F t 1 V : 1,659 -118 1 3 i : i r Y:\- .\Plan 5062.rhv Tuesday, February 18, 2014, 3.19 PM Room Length: 7.3 ft. System Number; 1 466 Room Width: 127 ft. Zone Number: 1 44 Area: 93.0 sq.ft. Supply Air: 13 CFM Ceiling Height. 9.1 ft. Supply Air Changes. 0.9 AC/hr Volume. 844.0 cu.ft. Req. Vent. Clg. 6 CFM Number of Registers. 1 Actual Winter Vent., 3 i CFM Percent of Supply.. 0 % Actual Summer Vent.. 0 CFM Percent of Supply, 6 % Actual Winter Infil.. 3 CFM Actual Summer Infil.. 3 CFM UP- Ceil -161 38 92.9 X 1 r _92.9. _._. , 1.8 167 a 1 2 s C} 111 Subtotals for Structure. 466 6 169 I Infil.. Win.; 3.1, Sum.; 3.1 67 2.855 199 0.661 -67 44 A D Excursion; _ �r . Room Totals: 656 -67 226 1 Z q v y i f EE t 1 e:\ ...\Plan 5062.rhv Tuesday, February 18 2014, 3.19 PM,-,- Room Length: 105.8 ft. System Number: 1 � Room Width: 1.0 ft. Zane Number: i � Area: 106.0 sq.ft. Supply Airy 70 CFM Ceiling Height: 0.1 ft. Supply Air Changes: 2.4 AC/hr Volume: 1,778.0 bu.ft. Req. Vent. Clg: 0 CFI Number of Registers: 2 0,661 Actual Winter Vent.: 0 CF Percent of Supply.: 0 % Pegple: 2 00 f t/per� _ 2 30 _ en /per . ��.,,._� _ _.� . _ .. _ . Actual Summer Vent.: 0 CFI 230 �,_�.� .. , Room Totals: Percent of Supply: 0 % -54 1,575 Actual Winter Infil.: 12 CFI i f i l r I x s Actual Summer Infil.: 12 CFM SF- Wall- 12FA0sw 11.5`X 0.1 84.4 0.065 4.5 370 0.7 0 62 I SF GIs - Atrium shgc - 0.33 OBI S 20 0.31 21.4 428 30.8 0 615 UP Ceil 1613 195.8 1 _ 105.8 0.026 1.8 . 351 1 . 2 .. _._ 0 234 Subtotals for Structure: 1,830 0 1,021 � Infil.: Win.: 11.7, Sum.: 11.7 254 2.856 726 0,661 -254 168 AED Excursion: 156 Pegple: 2 00 f t/per� _ 2 30 _ en /per . ��.,,._� _ _.� . _ .. _ . _ . _ _ . ..... _ 200 u.e_._� _ _ _� 230 �,_�.� .. , Room Totals: 2,556 -54 1,575 i f i l r I x s Y :\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3 :19 PM 83 ft. System Number: 1 6.3 ft. Zone Number; 1 44.0 sq.ft. Supply Air. 3 CFM .1 tt. Supply Air Changes: 0.4 AC/hr 403.0 cu.ft. Re.. Vent. 10: 0 CFM 1 Actual Winter Vent,: 0 CF Percent of Supply.: 0 % Actual Summer Vent.: 0 CF Percent of Supply: 0 % Actual Winter Infil.. 0 CFM Actual Summer Infil.: 0 CFM Subtotals for Structure; 80 0 53 Infil.: Win.: 0.0, Sum.: 0.0 0 0 0 0 0 0 E AFD Excursion: Room Totals: 80 0 69 i i k _ I E I i i l E E s E F Y;1 ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PI IMn Room Length: 7.5 ft. System Number: 1 Room Width: 12.5 -ft. ?one Number: 1 11 _ Area: 94.0 sq.ft. Supply Air. 29 CFM Ceiling Height: 9,1 ft. Supply Air Changes: 2.0 AC/hr Volume: 552.0 cu.ft. Reg. Vent, Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.. 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter lnfil.: 5 CFM Actual Summer lnfil.: 5 CFM NF- boor - Rear Entry Door 2 .7 X 21.4 0.357 24.6 525 7.9 0 168 3 UP - Cell - 1613 - 38.93,8 X 1 . r _ _ 9 6. _ 1 . 8 _ _ 168 � 1.2_ . 0 _ 11 _ Subtotals for Structure. 1,107 0 348 lnfil.: Win.: 5.2, Sum.: 5.2 114 2.855 324 0.661 -113 75 AFlO Excursion: .... ... . . ...... ...e.._.. .... ..... ,.. r ,_ . ___ _ _ �w _ _ _ .. „ �_ _ . _ _ ti ? Room Totals: 1,431 -113 470 �:\ ...`Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM 179.3 fit. System Number: 1 511 1 1.0 ft. Zone Number; 1 f 179.0 sq.ft, Supply Air: 64 CFM 9.1 ft. Supply Air Changes; 2.0 AC/hr 1,628.0 cu.ft. Req. Vent. Clg. 0 CFM 1 n. 1 Actual Winter Vent.. 0 CFM Room Totals: Percent of Supply.. 0 % Actual Summer Vent.. 0 CFM l Percent of Supply. 0 t % Actual Winter Infil.. 6 CFM Actual Summer Infil.. 6 CFM NW -GIs- Atrium shgc- 033`0 %S 20 0.310 21.4 428 26,6 0 511 1 UP- Ceil- 16R- 38179.3 X 1 1793 0.026 1.8 322 1.2 0 214 1 Subtotals for Structure: 1,136 0 788 Infil.: Whin: 4.9, Sum.; 4.9 106 2.869 303 0.661 -106 70 AED Excursion; 126 People. 200 latlper, 236 sen /per. n. 1 200 _. 230 I Room Totals: 1,439 94 1,208 d i j 7 i 1 { S � i 3 i Y:\ ...\Plan 6062.rhv Tuesday, February 18, 2014, 3:19 PM Room Length: 60.4 ft. System Number: 1 60.4 0.026 1.8 108 1.2 Room Width: 1.0 ft. .Zone Number: 1 332 Area: 60.0 sq.ft. Supply Air: 19 CFM Ceiling Haight: 9.1 ft. Supply Air Changes: 2.1 AC/hr Volume: ` 643.0 cu.ft. Req. Vent. Clg: 0 CFM j Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 °lam Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 4 CM Actual Summer Infil.: 4 CF NW-GIs-Atrium shgcm0 33 O IBS 8 0.310 21.4 171 25.6 0 205' UP-Ceil- 1613-38 60.4 X 1 60.4 0.026 1.8 108 1.2 0 72 Subtotals for Structurew. 617 0 332 Infil.: Win.: 3.8, Su.: 3.8 83 2.858 288 0.661 -83 55 AED Excursion: Room Totals: 855 -83 430 s i 1 ( :\ ...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Calculation Made: Htcg. & c1g. Occurrences: 1 Room Length: 9.2 ft. System Number: 1 Room Width: 5.7 -ft. Zone Number: 1 I Area: 52.0 sq.ft. Supply Air: 3 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 0.4 AC/hr Volume: 42.0 cuft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 0 CFM Actual Summer Infil.: 0 CFM Y :\ ...!Plan 5082.rhv Tuesday, February 18, 2014, 3:19 PM e Room Length : 149.9 ft. System Number: 1 Room Width: 1.0 ft. Zone Number: 1 k Area: 150.0 sq.ft. Supply Air: 88 CFM Ceiling Height :. 9.1 ft. Supply Air Changes: 3,9 AC/hr Volume :' 1,362.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 2 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 12 CFM Actual Summer Infil.: 12 CFM NW Wall- 12F -Osw 11:8 9:1 97.4 0.065 4.5 X92' 0.7' 0 54 NE- Wall- 12F -Osw 12.7 X 9.1 95 O.O65 4.5 426 03 0 70 SE- Wall- 12F -Osw 5 X 9.1 45.8 0.065 4.5 205 0.' 0 34 W -Oafs- Atrium shgc -0.33 0 %S 20 0.310 21.4 428 25.5 0 511 NE -GIs- Atrium shgc -9.33 0 %S 20 01.310 21.4 428 25.5 0 511 P- Cell- 1513 -38 149.9 X 1 149.9 0.026 1.8 269 1.2 0 179 � a . ... _. _ . .. ..a Subtotals for Structure: _ ._ _ .. . _ . __ ._ . r ...... _e - 2,143 _ - _e_. �. . _ � . . "" 0 _ .e. . 1,369 Infil.: Win.. 12.4, Sum.: 12.4 263 2.356 766 0.664 -266 176 AEU Excursion. 196 People. 2001 l tip r, 230,s en /err a1 ... -- �20' __ - � Room Totals: 2,914 -68 1,973 I I I i I i i : i �:\ — \Plan 5O62.rhv Tuesday, February 18, 2014, 3 :19 PM Room Length: 93.1 ft. System Number: 1 } Room Width: 1.0 ft. Zone Number: 1 11.1 Area: 93.0 sq,ft. Supply Air: 38 CFM Ceiling Height: 9A ft. Supply Air Changes: 2.7 AC/hr Volume: 846.0 cu.ft. Req. Vent.;Clg: 0 CFM Number of Registers`. 1 Subtotals for Structure: Actual Winter Vent.: 0 CFM 1,:358 0 Percent of Supply.: 0 % 2.855 527 Actual Summer Vent.: 0 CFI AEC Excursion: �.,.__.. ...�....�_ ,. ... ,.... � .. � _,,.. ...�.�_ . ,.�...�.. _ . Percent of Supply: 0 % I � .....:. _... �.._.. 81 � , ....�,. , Room Totals: Actual Winter Infil.: 9 CFM 1,885 -184 Actual Summer Infil.: 9 CFM SE- Wall- 12F -Osw 12 X 9. 1 109 0.065 4.5 489 0.7 0 80 NE- Door -R6.2 Door 3 X 8 24 0.161 11.1 267 3.5 0 85 I NE- C31s- Atrium shgc -0.33 O %S 12 0.310 21.4 257 25.6 0 307 - Cell - 165 -86 93.1 X 1 _.. ,..__. _ ...... , .,._ ...... ...... 93.1 ......._ . , , 0.026 1.8 167 ....., ..., . 1:2 0 ill � Subtotals for Structure: 1,:358 0 612 Infil.: Win.: 8.5, Sum.: 8. 185 2.855 527 0.661 -184 122 AEC Excursion: �.,.__.. ...�....�_ ,. ... ,.... � .. � _,,.. ...�.�_ . ,.�...�.. _ . � , ,..�......., ..._ � .....:. _... �.._.. 81 � , ....�,. , Room Totals: 1,885 -184 815 Y :\ ...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Calculation Made: Htg. & clg. " Occurrences: 1 327 Room Length: 2762 ft. System Number : 1 49 Ream Width: 1 .0 ft. Zone Number: 1 _ w. _ 1,039 Area: 276.0 sq.ft. Supply Air: 22 CFM Ceiling Height. 9.1 ft. Supply Air Changes: 0.5 AC /hr Volume: 2,569.6 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 Ala € Actual Winter Infil.: 3 CFM j Actual Summer Infil.: 3 CFM LIP - Ceil- 1613 -35 276.2 '1 n.. ,.� _ _ .. .......... _ 276.2 0.026 1.6 495 12 _ _ , .,_ _ ...., _ , . „v. . e ,,.. �. ,,..... _, _ ._.....m._ , . .... �.�..__.....,�.._ 0 ._._ 333 ... Subtotals for Structure:: 327 0 334 Infil.: Win.. 3.4, Sum.. 3.4 74 2x361 212 0.661 -74 49 AFD Excursion. I _ _ Room Totals. f { i i _ w. _ 1,039 e _ -74 ., _ . 431 E S 9 i { }}{ t { t j i 1 3 i i i p 3 ► :! ... \Plan 5062.rhv Tuesday, February 16, 2014, 3:19 P I Rec Room 839 4,582 91 7,7 1,104, _0 61 91 Bath 4 52 284 6 3 9 - 7 0 3 BR ,4 196 1,100 22 6 469 -18 26 22 2 4 Unf basement 1,664 10,606 211 6,6,6 1,903 -225 196 211 5 Great Room 246 4,342 86 7,7 2,893 -216 161 129 6 Kitchen /Nook 434 4,244 85 8,8 5,067 -275 232 227 7 Dining 173 1,470 29 7 - 955 - 112 53 43 8 Master BR 306 4,926 98 7,7,7 - 3,702 -223 206 166 9 WC 19 269 5 3 _ 74 -32 4 5 10 Master Bath 291 1,659 33 5,5 - 1,102 -118 61 4 11 WIC 93 656 13 4 226 -67 13 13 12 BR 2 196 2,556 51 6,6 _ 1,575 -54 88 70 13 Bath 2 44 80 2 3 59 0 3 3 14 Laundry 9 4 1,431 29 4 _ 470 -113 26 29 I 15 BR 3 179 1,439 29 7 - 1,208 94 67 54 16 Bath 3 60 855 17 4 - 430 -83 24 19 17 PDR 52 93 2 3 ., 69 0 4'' 18 Study 150 2,914 58 6,6 - 1,973 - 68 110 88 19 Entry 93 1,885 38 5 - 815 - 184 45 38 �20 Hal.!, _. .. �n .: 1,039 21 w_...� _ -_- . �, 5 .. . . Il .__ -. _.. _ 481 .,. ._ .. _ , w_ -74_ r ._ 37 .: . .2 Humidification 1,797 .. z e._ Sy t m 1 total .. 5,507 ... 925 .. . . . 2 4,583 4,583,. . 1,865 , ._.1, 1,100 Systems I Main Trunk Size: 25x12 in. Velocity. 527 ft. /min Loss per 100 ft.. 0.022 ih w Duct size results above are from Manual D Ductsize. Runout duct velocities are not printed with duct size results from Manual D Ductsize since they can vary within the room. See the Manual D Ductsize report for duct velocities and other data. r Carrier 92 A FUE 75000 n/a n/a n/a a a f a. r ■ r Y.\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3.19 PM I 1 • 1 • �• ° • • o original ori N ged th�Auto during the building a of Repo ep System 1 Northeast *1,367 *24,583 * -1,865 *2.05 I 45 East 1,330 23,949 Zone 1 1.99 90 0 Southeast 1,259 22,646 -1,865 1.89 135 South 1 Rec Room *91 91 91 91 91 91 91 91 7, Bath 4 *6 6 6 6 6 6 6 6 22,413 BR 4 26 22 25 33 28 22 28 *33 6 4 Unf basement *211 211 211 211 211 211 211 211 6,6,6 5 Great Room 161 *181 140 91 131 169 145 110 - 7,7 6 Kitchen /Nook 282 *315 247 163 231 278 254 198 8,8 7 Dining 53 36 51 60 54 40 54 *60 7 I 8 Meter BR 206 *211 181 138 175 194 191 159 7,7,7 10 Master Bath *61 50 59 60 51 38 51 60 5,5 11 WI *13 13 13 13 13 13 13 13 4 12 BR 2 *88 73 84 85 73 57 73 85 6,6 13 Bath 2 3 *3 3 3 3 3 3 3 3 1 14 laundry *29 29 29 29 29 29 29 29 4 z 15 BR 3 67 51 65 72 66 52 66 *72 7 16 Bath 3 24 17 23 26 24 18 24 *26 4 17 PDR 4 *4 4 3 3 3 3 3 18 Study 110 108 *112 102 110 102 105 95 6,6 19 Entry 4 *54 47 38 44 48 41 3 8 5 20 Hall 27 *27 26 24 24 24 24 24 5 * Indicates highest CFM of all rotations. CAMMM YA ....\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Northeast *1,367 *24,583 * -1,865 *2.05 I 45 East 1,330 23,949 -1,865 1.99 90 0 Southeast 1,259 22,646 -1,865 1.89 135 South 1,076 19,345 -1,865 1.61 180 Southwest 1,193 21,460 -1,865 1.79 225 West 1,193 21,448 -1,865 1.79 2701 Northwest 1,246 22,413 -1,865 1.87 3151 North 1,147 20,631 -1,865 112 CAMMM YA ....\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM YA ... \Plan 506 .rhv Tuesday, February 18, 2014, 3:19 PM Building Rotation Tonnage x 2.0 .e ................... ...................:........... a ........................ ...... ; E _... I 1. 81 ............ ............................... I ........................ .................. ................... ................ 1 ,7 .......................................... ................................... ................. ............. ....... .... { Northeast East Southeast South Southwest West Northwest North Direction Front door Fees k i BuiiCtlrlGt. Net'rOnrPa' C, E` i 3 I i F i f 3 { t .... ..,,.. ..,........,.. ,. __:...,�, ._...w.a, „. ......._.. i f .,...,.,�_.,. ... ..... ........ .,,..,.., ,:._. .._...,w... YA ... \Plan 506 .rhv Tuesday, February 18, 2014, 3:19 PM . •. 30. ............................... ............................... 2900 l .................................................. ................. «,,..,....,... , 28,000 .............. . .......................... ............................... ........ 1 >�"µ 27, S ... .. .... ... ... i 25 Mott :. ... . « ........................ ........ .,...,..,, . 24, OMM1....,.... ............... ........,.:.....e.... «,.,..,,,, � s ....,.,..e ,.,,........ a :...:.... :........ 21,000.. .,. ..,....,, ., ................ ................ ....: ....... 20,000 ��,. «. �� .............. ....... 19,000 .. . . ......... . ��. r 18,000. ... ....,.., s ..................... f ( c 17,000 {... ... , ..... ............. .. «,...,.,.,..,.,,.,......,.... .,,,,,,,..,.......,. ,.,...,.....,. . 16,000 ............ ..,.,...........,., 14,000 .. _..__.�_ �- _ -__,. . --- _,__, «__ __. Sam gam 10am 11 am 12 pm 1 pm 2pm 3pm 4pm 5prn 6pm 7pm { i Time of Clay Front door faces Northeast Frontdoorfaces East Front door faces Southeast Frontdoorfaces South ; F.nt door faces Southwest Frontdoorfaces Test Front door faces Northwest Frontdoorfaces North i (A ... \Flan 50 2.rhu Tuesday, February 18, 2014, 3:19 PM • • , rw Evaporator Coil = Carrier Model CNPV *4221AL +TD (.S "ors) l t ` it. The isi Duct Summary O W cOmPtdations stalk y of the p rovisiorr Report Units: Pressure. Irr.w , Duct lengths: Wit„ Duct sizes: Inch. Irlltaer F Number of active trunks, 3 Number of active rurrout . Total run out ou tlet airflow: 1,288 Main trunk alrftow. 1, Largest trunk diameter 18,6 T:100 Largest run out diameter 9 SR- k A ; Wl "$R t Ri- igne ..,�. ST-1 61 Sly -: saute. 0. . all e: 3. static pressure 047 - 3e0 OA 1 1 ( tt.Y 4721 Lour ' Y ( ft 268 R -370 k A ; Wl "$R t Ri- igne ..,�. SPECMCATION Evaporator Coil static Pressure * a x Evaporator Coil static Pressure a x r,§sa, �� "t CO {(`y}am�. .fi WX eGsi�r� w "r� 4 Ida s c s p� m'a c NY k.. tJ 4 Evaporator Coil static Pressure PERFORMANCE D (coot) Detailed Cooling Capacities M' g,. N a. rwrwn..... rururu.. r. w ��,.. isr.. uw. w�.., w aa`..... rw. nw... w, .w,w+rcM.rrwo-r.r•.�.Ww�sw..w rwrrrw.r w.. wwe... u., Wo ww. we... ..r.�...u.wuu.".�..�...�....: .. ......W... Detailed Cooling Capacities • , Sensible beat Gain = 24583 BTUs AC Delivers 27190 BTUs with sensible plus Y2 latent 24583/27190 = ,904 or 9.6/ over EVAPORATOR AIR I ** *A,0 .'A13 AWtt 0* , t+s fion With CAP** r k F. µ t Sensible beat Gain = 24583 BTUs AC Delivers 27190 BTUs with sensible plus Y2 latent 24583/27190 = ,904 or 9.6/ over Y.\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM . k Isce • .p «gar KK ! i`, 70 Summer: 50% 75 -39�04 • r • • t !! ! r 1 2 1i N� r i 1!1 • i! ! I • i • "11 � s r • • r i i • s • i i. is "1= M a r � ! �� �'. • i 1 F 1 i { i f i j i { i YA ...\Plan 5062.rhv Tuesday, February 10, 2014, 3:19 P MR YA \PIan 5662.rhv Tuesday, February 16, 2014, 3:19 P M Islet Ie c ft. � Sen a Nett Sen ys s' Duct Scope To To fTo Area Gan Gln Caesr� # g I oss l�l Act S►e Building 2.05 2.05 2,688 5,507 24,583 -1,865 24,583 48,227 925 1,100 1,100 System 1 2.05 2.05 2,688 5,507 24,553 -1,865 24,583 48,227 925 1 1,100 1,100 25x12 Humidification 1,797 Zone 1 5,507 24,583 -1,865 24,583 46 925 '1 1,100 12x1 I-Rec Boom 839 1,104 -90 1,104 4,582 91 49 91 7,7 2 -Bath 4 52 9 -7 9 284 6 0 6 3 3-BR 4 196 469 -18 469 1,1007 2 2 2 1 22 6 9 4 -unf basement 1,664 1,903 "225 1,903 10,606 211 85 211 6,6,6 5 -Great Doom 246 2,893 -216 2,893 4,342 87 129 129 7, 6- Krtchen/Nook 484 5,067 -275 5,067 4,244 85 227 227 8,8 7- Dining 173 955 -112 955 1,470 29 4 3 4 3 7 8- Master BR 346 3,702 -223 3,702 4,926 98 166 166 7,7,7 9-WC 19 74 -2 74 269 5 3 5 3{ 10- Master Bath 291 1,142 -118 1,102 1,659 33 49 49 5,5 11-WIC 93 226 -67 226 656 13 10 13 4 12-BR 2 196 1,575 -54 1,575 2,556 51 70 70 6,6 1 13 -Bath 2 44 59 0 59 80 2 3 3 3 14- Laundry 94 474 -113 474 1,431 29 21 29 4 15 -i 3 179 1,248 94 1,342 1,439 29 64 54 7 16 -Bath 3 60 434 -83 434 855 17 19 19 4 17 -PDR 52 69 0 69 93 2 3 3 3 18- Study 154 1,973 -68 1,973 2,914 58 88 88 6,6 19 -Entry 93 815 -184 815 1,885 38 36 38 5 20- ball 276 481 -74 481 1,039 21 22 22 5 Sum of room airflows maybe greater than system airflow because I s stem room airflow optton uses thegreater of heatin ear cooltn 1 t 3 YA \PIan 5662.rhv Tuesday, February 16, 2014, 3:19 P M -- -Duct Name: SMT -100; Feeds Into: Unf basement, Fitting: 1 -01, Effective Length: 147.6 Trunk 0.0003 18.6 527 0.000 Up: Fan 55 25 0.022 0.033 Rect 0:8 12 145.7 0.033 Presize 1,098 51 0.354 0.446 -- -Duct Name: STA 10, Feeds Into: Unf basement, Effective Length:. 3.7 Trunk 0.0003 152 307 0.000 Up: S.T -100 128 20 0.010 0.000 Rect 3.7 10 0.0 0.000 Presize 427 18.3 0.354 0.446 -- -Duct Name. STA 20, Feeds Into Unf basement, Effective Length. 2.5 Trunk 0.0003 18.6 322 0.000 Up: SMT -100 55 25 0.009 0.000 , Rect 2.5 12 0.0 0.000 + Presize 670 15.4 0.354 0.446 -- -Duct Name: Iii -100, Supplies: Master BR, Fittings. 2-1,4-H, Effective Length. 42.8 Runout 0.0003 7 206 0.000 Up. ST -130 55 5.4 0.012 0.005 Rnd 27 7.7 40.2 0.005 x Presize 55 4,9 0.345 0.455 -- -Duct Dame, SRA 10, Supplies: Faster BFI, Fittings: 2 -I, 4 -G, 8-A2, 8 -A2, Effective Length: 78.8 Runout 0.0003 7 206 0.002 Up: ST -390 55 5.4 0.012 0.008 Rnd 14.2 7.7 64.6 0.009 Presize 55 26 0.340 0.460 r a- -Duct Name: ST -130, Feeds Into: Unf basement, Effective Length. 0.8 i Trunk 0.0003 6.7 198 0.000 Up: T -390 55 4 0.014 0.000 Rect 0.8 10 0.0 0.000 Presize 55 1.9 0.350 0.450 k a -- -Duct Name. SRA20, Supplies: Master BR, Fittings: 2 -I, 4 -G, Effective Length: 73.6 1 1 Runout 0.0003 7 206 0.002 Up: ST -270 55 5.4 0.012 0.007 Rnd 16.0 7.7 57.6 0.009 Presize 55 293 0.341 0459 -- -Duct Name: ST -140, Feeds Inter: Unf basement, Effective Length. 4.8 Trunk 0.0003 12.9 142 0.000 Up: ST -270 55 14 0.003 0.000 Rect 4.8 10 0.0 0.000 Presize 138 19.3 0.350 0.450 "YA ..APlan 5062.rhv Tuesday, February 18, 2014, 3:19 PM -- -Duct Name: SR -130, Supplies: WC, Fittings: 2 -1, 4-G, Effective Length: 27.2 Runout 0.0003 3 102 0.001 Up. ST -290 128 2.4 0.010 0.001 Rnd 11.8 3.3 15.3 0.003 Presize 5 9.3 0.348 0.452 - --Duct Name: ST -150, Feeds Into: Unf basement, Effective Length. 1.5 Trunk 0.0003 15.2 285 0.000 Up. ST -200 55 20 0.009 0.000 Rent 1.5 10 0.0 0.000 Presize 396 7.5 0.351 0.449 --- Duct Name: SR -140, Supplies. Master Rath, Fittings: 2 -1, -H, Effective Length: 40.5 gg Runout 0.0003 5 183 0;002 Up. SMT -100 55 19 0.015 0,004 Rnd 15.0 5.5 25.5 0.006 Presize 25 19.6 0.348 0.452 --- Duct Nemec SR -150, Supplies: Master Rath, Fittings. 2 -1, 4 -H, Effective Length: 40.5 Runout 0.0003 5 183 0.002 Up. ST -350 55 3.9 0.015 0.004 ; Rnd 15,0 5.5 25.5 0.006 Presize 25 19.6 0..346 0.454 6- -Duct Name: ST -160, Feeds Into: Unf basement, Effective Length. 3.3 , Trunk 0.0003 15.2 415 0.001 Up: ST -350 55 20 0.019 0.000 Rect 13 10 0.0 0.001 I Presize 577 16.7 0.351 0.449 -- -Duct Name: SR -160, Supplies: WIC, Fittings, 2-1,4-G, Effective Length: 47.3 Runout 0.0003 4 149 0.002 i Up: ST -110 128 3.1 0,013 0.004 Rnd 16.2 4,4 31.1 0.006 Presize 13 16.9 0348 0.452 --- Duct Name: T -170, Feeds Into: Unf basement, Effective Length. 2.0 Trunk 0.0003 15.2 298 0.000 Up: ST -110 128 20 0.009 0.000 Rsct 2,0 10 0.0 0.000 Presize 414 10 0.354 0,446 = -- -Duct Name* SR -170, Supplies: BR 2, Fittings: 2-1,4-G, Effective Length: 56.5 Runout 0,0003 6 178 0.002 Up: ST -400 55 4.7 0.011 0.005 Rnd 162 6.6 40.3 0.006 Presize 35 25.4 0.347 0.453 ! €( YA ... \Plan 5062.rhv E Tuesday, February 18, 2014, 3:19 PM -- -Duct Name: ST -180, Feeds Into: Unt basement, Effective Length: 2.0 Trunk 0.0003 15.2 235 0.000 Up. ST -1'90 55 20 0.007 0.000 Rect 2.0 10 0.0 OMO Presize 327 10 0353 0.447 --- Duct Name: ST -190, Feeds Into: Unt basement, Effective Length: 0.7 4 Trunk 0.0003 15.2 235 0.000 Up. ST -400 55 20 0,007 0.000 r Rent 07 10 0.0 0.000 Presize 327 3.3 0.354 0.440 -- -Duct Name: ST -200 Feeds Into: Unt basement, Effective Length: 9.3 Trunk 0.0003 15.2 210 0.001 Up: ST -130 55 20 0.006 0.000 Rect 9.3 10 0.0 0.001 Presize 292 45.7 0.353 0.44, --- Duct Name: SRA80, Supplies: SR 2, Fittings: 2 -1, 4 -N, 8 -A2, 8•A2, Effective Length: 69.0 Runout 0.0003 6 173 0.003 Up: T -160 55 4.7 0.011 0.005 Rnd 23.2 6.6 45.9 0.008 s Presize 35 36A 0.346 0.454 -- -Duct Name: SR -190, Supplies: Study, Fittings: 2-1,4-G, 8-A2,8-A2, Effective Length: 72.6 Runout 0.0003 6 224 0 »µ003 Up: ST -220 55 41 0.017 0.009 Rnd 18.3 6.6 54.2 0.012 Presize 44 28.8 0.337 0.463 -- -Duct Naive: SR -200, Supplies: Study, Fittings. -1, -G, Effective Length: 67.9 Runout 0.0003 6 224 0.003 Up; ST -380 55 4.7 0.017 0,008 Rnd 19.5 6.6 48.4 0.011 Presize 44 30.6 0338 0.462 -- -Duct Name: ST -210, Feeds Into: Unt basement, Effective Length: 1.2 Trunk 0.0003 9.8 144 0.000 Up: ST -380 55 8 0.005 0.000 Rect 1.2 10 0.0 O.00O Presize 80 3.5 0.350 0.450 -- -Duct Name: SR -210, Supplies: Entry, Fittings: -1, 4 -1, Effective Length: 23.0 Runout 0.0003 5 279 0:000 Up: ST -210 128 19 0.028 0.007 Rnd 0.0 5.5 23.0 0.007 Presize 8 0 0.343 0.457 1 Y.0 ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 P - --Duct Name: ST -220, Feeds Into: Unf basement, Effective Length: 1.0 Trunk 0.0003 9.8 79 OMO Up: ST -2,10 55 8 0.002 0.000 Rect 1.0 10 0.0 0.000 Presize 44 3 0.350 0.450 -- -Duct Name: SR -220, Supplies: Rath 3, Fittings: 2 -1, 4-G, Effective Length: 44.7 Runout 0.0003 4 210 0.005 Up: ST -370 55 3.1 0.027 0.007 Rnd 19.5 4,4 25.2 0.012 Presize 19 20.4 0339 0.461 1 -- -Duct Name: ST -230, Feeds Into: Unf basement, Effective Length: 1.3 Trunk 0.0003 9.8 302 0.000 Up: ST -370 128 8 0.016 0.000 Rect 1.3 10 0.0 0.000 Presize 168 4 0.351 0.449 --- Duct Name: SR -230, Supplies: BR 3, Fittings: 2-1,4-G, Effective Length: 77.0 Runout 0.0003 7 202 0.002 Up: ST -360 55 5.4 0.012 0.007 Rnd 19.7 7.7 57.4 0.009 Presize 54 36 0.343 0.457 -- -Duct Name: ST -240, Feeds Into: Unf basement, Effective Length: 7.2 Trunk 0.0003 12.9 213 0.000 Up: ST -:360 128 14 0.006 OMO Rest 7.2 10 0.0 0.000 Presize 207 28.7 0.351 0.449 -- -Duct Name: SR -240, Supplies. Hall, Fittings. 2-1,4-G, Effective Length: 44.1 Runout 0.0003 5 161 0.001 Up: ST -310 55 3.9 0.012 0,005 Rnd 5.5 5.5 38.6 0.005 Presize 22 72 0.347 0.453 -- -Duct Name: ST -250, Feeds Into: Unf basement Effective Length. 1.8 Trunk 0.0003 12.9 255 0,000 Up: T -310 55 14 0.009 0.000 Rect 1.8 10 0.0 0.000 Presize 249 7.3 0.352 0.448 -- -Duct Name: SR -250, Supplies. Dining, Fittings. 2 -1, 4 -H, 8-A2, 8 -A2, Effective Length: 91.3 Runout 0.0003 < 7 161 0.003 Up: ST -120 55 5.4 0.008 0.004 Rnd 40.2 71 51.1 0.007 Presize 43 73.6 0.347 0.453 Y :i ..,\Plan 5062.rhv Tuesday, February 18, 2014, 3 :19 PM -- -Duct Name: ST -260, Feeds Into: Unf basement, Effective Lengths 3.5 Trunk 0.0003 15.2 451 0,001 Up: ST -120 55 20 0.022 0.000 Rect 3.5 10 0.0 0.001 Presize 627 17.5 0353 0.447 -- -Duct Name. SR -260, Supplies: Kitchen /Nook, Fittings: 2 -1, 4 -H, Effective Length: 601:6 Runout 0.0003 8 324 0.002 ` Up: ST -300 55 6.2 0.022 0.012 { Find 7.7 81 52.0 0.014 Presize 113 16.1 0337 0,463 -- -Duct Name: ST -276, Feeds Into: Unf basement, Effective Length. 6.8 Trunk 0.0003 12.9 199 0.000 Up; ST -300 55 14 0.006 0.0010 Rect 6.8 10 0.0 0.000 Presize 193 273 0.350 0.450 - - -Duct Name. SR -270, Supplies. Kitchen /Nook, Fittings. 2-1,4-G, Effective Length: 94.1 k Runout 0x0003 8 324 0.006 Up. T -160 55 6.2 0.022 0 «015 Rnd 273 8.7 667 0.021 i Presize 113 57.2 0.330 0.470 -- -Duct Name. ST -280, Feeds Into: Unf basement, Effective Length. 4.8 Trunk 0.0003 152 334 0.001 Up; ST -160 55 20 0.013 0.000 Rect 4.8 10 0.0 0;001 Presize 464 24.2 0351 0.449 --- Duct Name: SR -28O, Supplies: Great Roam, Fittings: 2-1,4-G, 8-A2,8-A2, Effective Length. 110.4 Runout 0.0003 7 243 0.006 r Up: T -280 55 5.4 0.016 0.012 Fend 35.8 7.7 74.6 OM 8 Presize 65 65.7 0333 0.467 -- -Duct Name: ST -29O, Feeds Into: Unf basement, Effective Length: 0.8 1 Trunk 0.0003 15.2 287 0.000 3 Up: ST -280 55 20 0.010 0.000 Rect 0.8 10 0.0 0.000 Presize 399 42 0.351 _ 0.449 -- -Duct Dame: SR -290, Supplies: Great Room, Fittings. 2-1,4-G, 8-A2,8-A2, Effective Length: 113.1 j Runout 0.0003 7 243 0.007 Up: ST -340 55 5.4 0 „016 0.011 Rnd 45.8 7.7 673 0.018 Presize 65 84 0.332 0.468 Y:\...\Pian 5O62.rhv Tuesday, February 18, 2014, 3 °.19 PM -- -Duct Name: ST-300, Feeds Into: Unf basement, Effective Length: 3.2 0.0003 7 Trunk 0.0003 15.2 220 0.000 Up: ST-340 55 20 0.006 OMO Rect 3.2 10 0.0 Omo Presize 306 15.8 0.350 0,450 -- -Duct Name: SR-300, Supplies: Laundry, Fittings: 2-1,4-G, Effective Length, 36.7 46 Runout 0M03 4 332 01,003 Up: ST-200 128 3.1 0.051 0.016 1 Rnd 5.8 4.4 30.8 0.019 Presize 29 6.1 OM4 0.466 ---Duct Name: ST-310, Feeds Into: Unf basement, Effective Length: 7.2 Trunk 0,0003 12.9 279 0.001 Up: ST-200 55 14 0.011 0.000 Rect 7.2 10 0.0 0M1 Presize 271 28.7 0.352 0.448 --- Duct Name: SR-310, Supplies: Bath 2, Fitting: 4-G, Effective Length: 10.2 Runout 0.0003 3 61 OMO Up: ST -17"0 55 2.4 0.005 O'OoO Rnd 3.7 3.3 6.5 OMO Presize 3 2.9 0.353 0.447 -- -.Duct Name: ST-320, Feeds Into: Unf basement, Effective Length: 1.3 Trunk 0.0003 15.2 297 0.000 Up. T -170 128 20 0.009 OMO Rect 1.3 10 0.0 0.000 Presize 412 63 0.354 0.446 -- -Duct Name: SR-320, Supplies: PDR, Fittings: 2-1,4-G, Effective Length: 21.2 Runout 0.0003 3 61 0.000 Up: ST-230 55 2.4 0M5 0.001 Rnd 6.5 3.3 14.7 0.001 Presize 3 5.1 0.350 4A50 -- -Duct Name: ST-330, Feeds Into: U basement, Effective Length: 5.8 Trunk 0.0003 9.8 299 0.001 Up: ST-230 128 8 0.015 0.000 Rect 5.8 10 0.0 0.061 Presize 166 17.5 0,350 0.450 Runout 0.0003 7 172 0.003 Up: ST -150 128 5.4 0.008 0.005 Rnd 41.0 7.7 68.5 4M9 Presize 46 75.1 0.342 0.458 YA ... \Plan 5062.rhv Tuesday, February 18 , 2014, 3:19 PM,,- - --Duct Name; T -340, Feeds Into: Unf basement, Effective Length: 0.8 Trunk 0.0003 152 267 0.000 Up. ST -150 55 20 0.008 0.000 Rect 0.8 10 0.0 0.000 3 Presize 371 4.2 0351 0.449 -- -Duct Name: R -340, Supplies. Rec Room, Fitting 2 -1,4-AD, Effective Length: 85.3 Runout 0.0003 7 172 0.003 Up. ST -260 128 5.4 0.008 0.004 Rnd 31.7 7.7 53.7 0.007 Presize 46 58 0.347 0.453 -- -Duct Name. ST -350, Feeds Into. Unf b asement, Effective Length. 6.3 Trunk 0.0003 15.2 433 0.001 Up. ST -260 55 20 0.020 0.000 } Meet 63 10 0.0 0,001 Presize 602 31.7 01.352 0.448 -- - Name. SR -350, Supplies. Bath 4, Fittings. 2 -I, 4 -AD, Effective Length. 28.5 y � i Runout 01.0003 3 122 0.001 Up. T -250 128 2.4 0.013 0.002 j Rnd 112 3.3 173 0.004 Presize 6 8.8 0.348 0.452 -- -D uct Name.. T - 360, Feeds Into. Unt basement, Effective Length: 3.3 Trunk 0.0003 12x0 256 0.000 Up, ST -250 55 14 0.009 0.000 Rect 3.3 10 0x0 0000 Presize 249 13.3 0.352 0.448 - - -Duct Name. •36 , Supplies. ER 4, Fittings. 2 -I, 4 -AID, Effective Length. 55.7 Runout 0.0003 6 112 0.001 I Up. ST -240 128 4.7 0.005 0.002 { Rnd 192 6.6 36.5 0.003 s Presize 22 30.1 0.349 0.451 -- -Duct Name. T -370, Feeds Into: Unf basement, Effective Length. 1.5 I Trunk 0.0003 12.9 190 0.000 Up. T -240 128 14 0.005 0.000 Rect 1.5 10 0.0 0.000 Presize 185 6 0.351 0.449 -- -Du Name. SR -370, Supplies. Unf basement, Fittings. 2 -I,,4 -Ali, Effective Length. 72.4 Runout 0.0003 6 357 0.006 Up. ST -330 128 4.7 0.035 0.019 Rnd 16.2 6.6 562 0.025 Presize 70 25.4 0325 0.475 YA .,APlan 5062.rhv Tuesday, February 18, 2014, 3:19 PM -- -Duct Name: ST-380, Feeds Into: Unf basement, Effective Length: 1.7 Trunk 0.0003 9.8 223 OMO Up: ST-330 55 8 0.010 0.000 Rect 13 10 0.0 0.000 Presize 124 5 0.350 0.450 --- Duct Name: SR-380, Supplies: Lint basement, Fittings: 2-1, 4-AD, Effective Length: 60.6 Runout 0.0003 6 357 0M4 Up: 3T-140 128 4.7 0.035 0.017 Rnd 11.7 6.6 48:9 0.021 Presize 70 18.3 0.329 0,471 --- Duct Name: ST-390, Feeds Into: Unf basement, Effective Length: 1.8 Trunk 0.0003 12.9 113 OMO Up: ST-140 55 14 0M2 0.000 Rect 1,8 10 0.0 OMO Presize 110 73 0,350 0.450 -- -Duct Name: SR-390, Supplies: Unf basement, Fittings: 2-1, 4-AD, Effective Length: 67.1 Runout 0M03 6 357 0.005 Up: ST-320 128 4.7 0.035 0,018 Rnd 14.5 6.6 52.6 0.023 Presize 70 22.8 0,330 0,470 -- -Duct Name: ST-400, Feeds Into: Unf basement, Effective Length: 1.8 Trunk 0.0003 15.2 261 0.000 Up: ST-320 55 20 0.008 0.000 Rect 1.8 10 0.0 0.000 Presize 362 9.2 0.354 0A46 Report Units: Pressure: inwg, Duct lengths: feet, Duct sizes: inch, Airflow: CFM, Velocity: ft./min, Temperature: F Notes: Static pressure available values for return ducts are at the entrance • the duct. For supply, they are at the exit, The cumulative static pressure loss value for a return trunk is with respect to the entry point of the return runout upstream with the highest static pressure available. Total and cumulative static pressure loss values for the supply main trunk include any device pressure losses entered, and the cumulative may also include the total static pressure loss of the return side, IONG I I 101111MM&OHM MIN-11121111111W4 • Largest trunk diameter: Largest runout diameter: YA..AP1an 5062.rhv Tuesday, February 18, 2014, 3:19 PM Cq- Smallest trunk diameter: 6.7 ST - 130 Smallest runout diameter: 3 SR - i Supply fan external static pressure: 0.333 � Supply fan device pressure losses: 0.300 Supply fan static pressure available: 0.500 i Runout Maximum cumulative static pressure loss: 13.475 ` Sit -3703 Return loss added to supply: 11.113 Total effective length of return ( ft.): 472.7 Lo Total effective length of supply ( ft.): 266.9 SR -370 Overall total effective length ( ft.): 741.7 Low to SR -370 1 Design overall friction rate per 100 ft.: 0.06. (Available SP x 100 TEL) System duct surface area (No Scenario). 1279.1 Total system duct surface area: 1279.1 i i l i 9 3 1 } f } i i j 1 `i. } j i (:0 ...\Plan 50 2.rhv Tuesday, February 18, 2014, 3:19 PM - - -Duct Name: RMT -100, Feeds From: Unf :basement, Fittings: 5 -H1 5 -L, Effective Length: 258.2 Trunk 0.003 18.6 518 O;OOO Up: Fan 75 25 OM9 0.075 Rect 0,5 12 257.7 0.075 Presize 1,288 3.1 -O.0 8 0.113 w - - Duct Name: RT -110, Feeds From: Unt basement, Effective Length: 0.5 Trunk 0.0003 18.6 345 0.000 Up: RMT -100 75 25 0.810 0.000 Rect 0.5 12 0.0 O.00O Presize 718 3.1 -0.037 4 0.030 - --Duct Name: RT•120, Feeds From: Unf basement, Effective Length: 2.7 Trunk 0.0033 12.0 369 0;000 Up. RT-140 75 14 0.017 0.000 Rect 2.7 10 0.0 0.000 Presize 359 10.7 - 0.037 0.029 = - -Duct Name: RT -130, Feeds From: Unf basement, Effective Length: 2.7 Trunk 0.0003 12.9 369 0.000 Up. RT -110 75 14 0.017 0.000 Rect 2.7 10 0.0 0.000 Presize 359 10.7 -0.037 0.030 i -- -duct Name: RT -140, Feeds From. Unf basement, Effective Length: 1.2 Trunk 0.0003 18.6 172 0.000 Up. RTR110 75 25 0.003 0.000 Rect 1.2 12 0.0 0.000 Presize 359 72 -0.037 0.030 -- -Duct Name: RT -150, Feeds From: Unf basement, Effective Length: 1.0 Trunk 0.0003 18.6 274 0.000 Up. RMT -100 75 25 0.007 0.000 Rect 1.0 12 0.0 0.000 Presize 570 62 - 0.037 0.112 -r -Duct Name: RT -160, Feeds From: Unf basement, Effective Length: 12.8 r Trunk 0.0003 10 616 0.007 Up. RT -150 75 7.8 0.452 O.00O Rnd 12.8 10.9 0.0 0.007 Presize 336 33.6 -0.031 0.106 -- -Duct Name: High, Returns From: Kitchen /Nook, Fittings: 6 -B, -H, 8 -1133C, Effective Length: 169.9 Runout 0.0003 12.9 369 0.000 Up. RT -120 75 14 0.017 0.029 Rect 0.5 10 169.4 0.029 Presize 359 2 -0.008 0.029 ( } }£ YA ... \Plan 5062.rhv _..._ . m__ .Tuesday, February 18, 2014, 3 :19 PM"" h -- -Duct Name: Low, Returns From: Kitchen /Nook, Fittings: 6 -R, 6 -H 8-B3C, Effective Length: 170.0 Runout 0.0003 12.9 369 0.000 Up: RT -130 75 14 0.017 0.029 l Rect 0.6 10 169.4 0.029 Presize 359 2.4 -0.008 0n029 W - - Duct Name: RT -170, Feeds From: Unf basement, Effective Length: 5.7 Trunk 9.0943 9.8 421 0.002 Up: RT -150 75 8 0.031 0.000 Rect 5.7 10 0.0 0.002 Presize 234 17 -0.036 0.027 ? -- -Duct Name: RT -180, Feeds From: Unf basement, Effective Length: 6. Runout 4 ? Trunk. 0.0003 9.8 421 0.002 Up: RT-170 75 8 0.031 0.000 j Rect 6.7 10 0.0 0.002 Presize 234 20 -0.034 0.025 _f __Duct Name: Low, Returns From: Rec Room, Fittings: 6 -try 6-G, 8 -A2, Effective Length: 200.7 Trunk Runout 0.0003 12.9 346 0.000 Up: RT -160 75 14 0.015 0.031 Rent 0.5 10 200.2 0.031 Presize 336 2 0.000 0.031 SO Runout 0.0003 7 292 0.000 Up: RT -180 75 5.4 0.022 0.008 Rnd 03 7.7 37.6 0.008 Presize 78 0.6 `0.026 0.008 --- Duct Name: RT -190, Feeds From: Unt basement, Effective Length: 1;5 Trunk 0.0003 9.8 281 0.000 Lap: T -180 75 8 ` 0.015 0.000 ' Rect 1.5 10 0.0 0.000 Presize 156 4. -0,033 0.025 --Duct Name: Mstr High, Returns From: Master 3R, Fittings: 6-C, 6 -t3, 12-S, Effective Length: 50.9 Runout 0.0003 7 292 0.400 Up: RT -190 75 5.4 "" 0.022 0.011 Rnd 0:3 73 ' ' 54.5 0.411 Presize 78 0.6 -0.423 0.011 -- -Duct Name: RT -200, Feeds From: lint basement, Effective Length: 1.0 Trunk 0.0003 9.8 140 0.004 Up: RT -190 75 8 0.004 0.000 Rect 1.0 10 0.0 0.000 Presize 78 3 -0.033 0.025 YA .,APlan 5062.rhv Tuesday, February 14, 2014, 3:19 PM YA ..APlan 506 .rhv Tuesday, February 18, 2014, 3:19 ISM ""° clb Rear Entry Door: Door -R =2.8 21.4 526 0 1618 168 R6.2 Door: Door -U =.161 24 267 0 85 85 F 15815 - 0w -9: Wall- 903.2 3,115 0 39 39 Basement R11 -9: Wall - Basement, Custom, R -11 1828.8 6,641 0 89 89 Basement wall 12F -Osw: Wall - Frame, -21 insulation in 2 x 6 stud cavity, 2140.9 9,604 0 1,574 1,574 no board insulation, siding finish, wood studs 168 -38: Roof /Ceiling -Under Attic with Insulation on Attic 2757.5 4,947 0 8,295 3,295 r . Floor (also use for Knee Walls and Partition Ceilings ), f Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R -38 insulation 21 A -32. door- Basement, Concrete slab, any thickness, 2 2749.9 3,795 0 0 0 or more feet below grade, no insulation below floor, I any floor cover, shortest slue of floor slab is 2' wide { Subtotals for structure. 38,242 0 17,895 17,895 People. 5 1,000 1,150 2,150 1 Equipment. 0 1,200 1,200 Lighting: 0 0 0 F Ductwork: 0 0 0 0 Infiltration: Winter CFM: 132, Summer CFM: 132 8,188 -2,865 1,897 -968 Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0 1 Humidification (Winter) 4.90 gal /day : 1,797 0 0 0 g AFD Excursion: ___ _. _. , _ w..w _ 0 _ 0 441 441 Total Building Load Totals. 48,227 -1,865 24,583 22,718 5 Total Building Supply CFM: 1,100 CFM Per Square ft.: 0.200 Square ft, of Room Area: 5,507 Square ft, Per Ton: 2,909 S Volume (11: of Cod. Space: 53,005 Total N afincg Required Including Ventilation Air: 48,227 Btuh 48.227 MBH Total Sensible Gain: 24,583 Btuh 100 °! Total Latent Gain: -1,865 Btuh 0 % Total Cooling Required Including Ventilation Air: 24,583 Btuh 2.05 Tons (Based On Sensible + Latent) data • ur design conditions. Y:\ ...!Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM System Type: Standard Air Conditioner Outdoor Model: CA13NA036 * * * *(A Indoor Model: CNPV *4 1AL * +TDR i Tradename: 13 SEER PURON A Outdoor Manufacturer: CARRIER AIR CONDITIONING y ANRI Reference No.. 6305466 Nominal Capacity: 33033 Efficiency: 13 SEER Heating System Type: Natural teas Furnace Model: 5 SC B030S 1 -- 0 Trade name: Carrier Manufacturer: N CARRIER CORPORATION Description: Natural teas or Propane Furnace Capacity: 75000 Efficiency: 92,1 AFIRE } t I 1 i 1 f I s l i i l I v „ Rec Room r } Calculation Mode: Ntg. & c1g. Occurrences: i 1 j Boom Length. 839.1 ft. System Number: 1 3 Room Width: 1.0 ft. Zone Number. 1 i Area. 839.0 sg.ft. Supply Air: - 91 CFM Ceiling Height; 10.2 ft, Supply Air Changes: 0.6 AC hr (€ Volume. 8,8301,0 cu.ft. Req. Vent. Clg. 0 CFM Y Number of Registers: 2 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CM Percent of Supply: 0 % Actual Winter Infil.: 4 CM Actual Summer Infil.: 4 CFM N- Wall - 151315 -Ow -9 42.2 X 412.9 0.047 &5 1,439 0.0 0 21 10).2 y SF- Wall - 151315 -0w -9 14.4 X 146 Ot 047 3.6 523 0.1 0 10 } 10.2 SW Wall - 151315 - 0w - 17 X 10.2 156.9 0.047 3 .3 522 0.0 0 3 I NW®Ols- Atrium shgc -0.33 O %S 16 0.310 21.4 342 25.6 0 409 r W -CPIs- Atrium shgc -0,33 O %S 16 0.310 31.4 342 30.8 0 492 Floor- 21A -32 1 X 839.1 839A 0.020 ... 1.4 1,158 0,0 0 0 Subtotals for Structure: 4,326 0 935 f lnfil,: Win.: 4,1, Sum.; 4.1 90 2.853 256 0.657 -90 59 AFD Excursion �_ _��.. _._ e_ ., _ . ,.._ . ........... _.�,_ __, - ..� _,,.....,_.,m ., ._ _� ��.. __ ..._ ��_,���. �. - _ __. _..e� _. 1 . 1 0_. 1 room Totals. 4,582 -90 1,104 3 1 i i f I z I E i :0 ...lPlan 5062.rhu Tuesday, February 18, 2014, 3:19 P (A ... \Plan 5062,rhv Tuesday, February 13, 2014, 3:19 P - ----- ----- ------ ----------- �� ---------------- ---- --------------------- -- - ---- -- ............. .... . . - ------ - -------- ---1 .......... �k� t �w.. ��3a♦ 1,« a�i1:,.. a •.a��?.a�.,�aw,uz,wa,wsaw,.,� �l i t t\ Vl ii t, tt u.��l� } t � i i\ , ti� �.1 lUl itlt t} ;�t}li - F , --- y - e - L - - q - q --- d - P - r q - 6 e - d - - ------------ Calculation Mode: Htg. & c1g. Occurrences: Room Length: 14.7 ft, System Number: Room Width: 13.3 ft. Zone Number: Area: 196.0 sq.tt. Supply Air: 22 CFM Ceiling Height: 10.2 ft. Supply Air Changes: 0.7 AC/hr Volume: 1,986.0 cu,ft. Req. Vent. Clg. 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 1 CFM Actual Summer Infil.: I CFM NW-WaIl-1 51315 -Ow -9 14.7 X 133.2 0.047 3.3 437 0.0 0 1 10.2 INW -Gls-Atrium shgc-0.33 O%S 16 0310 21.4 342 25.6 0 409 1 Floor-21A-32 I X 195.6 195.6 0.020 . .. . . ......... .... . . . . .... .... .. . . .... 1,4 270 U 0 0 Subtotals for Structure: 1,049 0 410 Infil.: Win.: 0.8, Sum.: 0.8 18 2.849 51 0.670 -18 12 AEC Excursion: 47 Room Totals: 1,100 -18 469 Y:\ ..\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Calculation Mode. Ht g. & clg, ' Occurrences: t Room Length: 1,6618 ft. System Number: 1 t Room Width: 1.0 ft. Zone Number:. , 1 r Area: 1,664.0 sq.ft. Supply Air: 211 CM s Ceiling Height. 10.2 ft, Supply Air Changes: 0.7 AC /hr Volume:` 16,915.0 cu,ft. Req. Vent. Clg, 0 CFM Number of Registers: 3 Actual Winter Vent.: 0 CF 0.051 3.7 310 Percent of Supply.: 0 % 10.2 Actual Summer Vent.: 0 CFM 6 SE- Wall - Basement R11 -9 20 X Percent of Supply: 0 % 744 0,1 0 Actual Winter lnfil.: 10 CFM Actual Summer lnfil.: 10 CFM 10.E NE- Wall - Basement R1 -9 12.5 127.1, 0.051 3.7 465 0.1 O 8 r X 10.2 SE- Wall - Basement R11 -9 5 X 50.8 0,051 3.7 186 0,1 0 10.2 3 NE- Wall - Basement R1 1 -9 8.3 X 84.7 0.051 3.7 310 0.1 0 5 I 10.2 6 SE- Wall - Basement R11 -9 20 X 203.4 0.051 3.7 744 0,1 0 12 10.2 NE-Wall-Basement R11 -9 29 X 204.0 0.051 3.7 1,070 0.1 0 18 10.2 SE- Wall - Basement R11 -9 49.8 474.8 0.051 3.6 1,705 0.0 0 14 X 10,2 SW-Wall-Basement R11 -9 18 X 167.1 0.051 3.6 595 0.0 0 3 10.2 i NW- Wall- Basement RI 1-9 14.3 145.7 0.051 3.7 533 0,1 0 9 j X 10.2 S- Wall - Basement R11 -9 14.8 150.8 0.051 3.7 552 0.1 0 9 X 10.2 SE -C l - Atrium shgc -0.33 O JAS 16 0.310 21.4 342 30.8 0 492 S -Gls- Atrium shgc -0.33 O %S 16 0.310 21..4 342 30.8 0 492 SW- Gls- Atrium shgc -0.33 O %S 16 0,310 21.4 342 30.8 0 492 Floor-21A-32 1 X 16618 1663.8 0.020 1.4 2,296 0.0 0 0 Subtotals for Structure: 9,963 0 1,565 lnfil.. Win. Sum.. 10.4 225 2.856 643 0.662 -225 149 i AED Excursion. 189 Room Totals; 10,606 -225 1,903 y V Z ... _ _ ._ ...... _ .... _. .. _. �_ w... __ _.... _ i Y.l ... \Plan 5062.rhv Tuesday, February 18, 2014, 3.19 PM f Calculation Mode: Htg: & c1g. 0.065 Occurrences: 1 O.7 Roam Length: 143 ft. System Number: 1 4.5 Room Width: 17.2 ft. Zone Number: 1 12.5 Area: 246.0 sq.ft. Supply Air: 129 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 3.5 AC /hr Volume: 2,235.0 cu.ft. Req. Vent. Clg: 0 CF r Number of Registers: 2 0 Actual Winter Vent.: 0 CFM 0.026 _ ..... 1.8 441 Percent of Supply.: 0 % Subtotals for Structure: Actual Summer Vent.: 0 CM 0 2,100 Infil.. Win.: 19.2, Sum.: 19.2 Percent of Supply: 0 % 1,189 0.663 -416 Actual Winter Infil.: 19 CFM Actual Summer Infil.: 19 CFM SE-Wall- I 2F-Osw 14.3'X 9.1 130.1 0.065 4.5 534 O.7 0 96 SW- Wall- 12F -Osw 17.2 X 9.1 105.9 0.065 4.5 475 0,7 0 78 SW -GIs- Atrium shgc -0.33 O %S 12.5 0.310 21.4 267 30.7 O , 384 SW -Cls- Atrium shgc -0.33 O %S 12.5 0.310 21.4 267 30.7 0 384 SW -CIs- Atrium shgc -0.33 O %S 25 0310 21.4 535 30.7 0 768 UP -Cell- 168 -8 246.1 X 1 _. _ 246.1 0.026 _ ..... 1.8 441 1.2 0 294 _... _rr.... Subtotals for Structure: 3,153 0 2,100 Infil.. Win.: 19.2, Sum.: 19.2 416 2.857 1,189 0.663 -416 276 AEC? Excursion: 287 Peoplp_ l t/per, 230 seQ p . , ._ 1 , _ _ _w_ . , _ ... 200 230 Room Totals: 4,342 -216 2,893 t i i t i 1 4 i Y:\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PIS I Room Length: 484.3 ft. System Number: 1 0 Room Width: 1.0 ft. Zone Number: 1 30.7 Area: 484.(3 sq.ft. Supply Air: 227 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 3.1 AC /hr Volume. 4,399.0 cu.ft. Req. Vent. Clg. 0 CFM I Number of Registers: 2 0.664 Actual Winter Vent.. 0 CFM Percent of Supply.. 0 % I E clui men( Actual Summer Vent.. 0 CFM 1 200 Room Totals: de. m. _ �_.. �.:.,�� Percent of Supply.. 0 % I -275 ,w . 5,067 Actual Winter lnfil.. 13 CFM Actual Summer lnfil.. 13 CFM SW®Wall -1 2F-Osw 14.9 X 9.1 4w8 0,065 4x5 246 0.7 0 40 i SW -GIs- Atrium shgc -0.33 O %S 80 0.310 21.4 1,711 30.7 0 2,459 UP- Ceil -16R- 38 8 484.3 1 . _._ r_ 484.3 _0.026 1.8 869 1.2 0 _w _ 579 Subtotals for Structure: 3,457 0 3,181 lnfil.: Win„ 12.7, Sum.. 12.7 276 x.856 787 0.664 -275 183 Ali Excursion: 513 E clui men( 0 1 200 Room Totals: de. m. _ �_.. �.:.,�� ._ . . ._ , . _ 4,244 .. w_ _ .. . _ ,e_ -275 ,w . 5,067 e:\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Room Length: 123 ft. System Number: { Room Width: 14.0 ; ft. Zone Number: Area: 173.0 sq.ft. Supply Air: Ceiling Height: 0.1 ft. Supply Air Changes: Volume: 1,568.0 cu.ft. Req. Vent, Clg: Number of registers: 1 -112 Actual Winter Vent.: Percent of Supply.:. Actual Summer Vent.: Percent of Supply: Actual Winter Infil.: Actual Summer Infil.:: 1 20 0.310 21.4 428 25.6 1 511 j 43 of 3 1.6 AC/hr 0 OFM 0 CFM 0 % 0 CFM 0 % 5 CM 5 C.� � NW- CIS - Atrium shgc- 0.33 O %S 20 0.310 21.4 428 25.6 0 511 j UP -Ceil- 1613- 38172.7 X 1 172.7 0.026 1.8 313 1.2 0 207 Subtotals for Structure; 1,150 0 766 Infil.. Win.. 5.2, Sum.. 5.2 112 2.858 320 0.661 -112 74 E A ft Excursion: m _ 5 Roam Totals: 1,470 -112 955 k 4 i i t Y:\...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 Pl� Room Length: 306.4 t. System Number: 1 0.7 Ream Width: 1.0 ft. Zone Number: 1 4.5 Area: 306.0 s%ft. Supply Air: 166 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 3.6 AC/hr Volume: 2,783.0 cuft Re, Vent. Clg: 0 CFM Dumber of Registers: 3 SW- GIs - Atrium shgc -0:33 O %S Actual Winter Vent.: 0 CFM 321 307 0 Percent of Supply.: 0 % 0.310 21.4 535 Actual Summer Vent.: 0 CFM t UP- Ceil- 16R -38 306.4 X 1 306.4 0.026 Percent of Supply: 0 % 0 366 Subtotals for Structure. Actual Winter Infil.: 19 CF 3,717 0 Actual Summer Infil.: 19 CFM SE- Wall -1 F -Osw 14.3'X 9.1 130.1 0.065 4.5 584 0.7 O 96 SW- Wall- 12F -Os r 18 X 9.1 1054 0.055 4.5 486 0.7 0 80 #W- Gls -Atrium shgc -0.33 O %S 20 0.310 21.4 428 25.6 0 511 SW- GIs - Atrium shgcw0.33 O %S 15 0.310 21.4 321 30.7 0 461 SW- GIs - Atrium shgc -0:33 O %S 15 0.310 21.4 321 307 0 461 SW- Gls- Atriurn hgc -0.33 O °JAS 25 0.310 21.4 535 30.7 0 768 UP- Ceil- 16R -38 306.4 X 1 306.4 0.026 550 1.2 0 366 Subtotals for Structure. 3,717 0 2,824 Infil.. Win.. 19.5, Sum.. 19.5 423 2.856 1,209 0.661 -423 280 AED Excursion. 368 People. 200 lat/per, 230 senler. 1 . _ _ _ 200 _._ 230 Roam Totals. 4,926 -223 3,702 f :\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Room Length: 3.5 ft. System Number: 1 178 .doom Width: 5.5 ft. Zone Number: 1 21 Area: 19.0 sq.ft. Supply Air: 5 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 1.6 AC/hr Volume: 175.0 cu.ft. Req. Vent. Clg: 0 CEM Number of Registers: rs: 1 Actual Winter Vent.: 0 C M ! Percent of Supply.: 0 % Actual Summer Vent.. 0 CPM Percent of Supply: 0 % I Actual Winter Infil.: 1 CEM Actual Summer Infil.: 1 C. =M t P -Ceil- 155 -: 3 19.2 } 1 19.2 0.0 6 1.3 35 1. Cl 3 Subtotals for Structure: 178 0 46 Infil.: Win.: 1:5, Sum.: 1.5 32 2.363 91 0.661 -32 21 AED Excursion: . , . .. . . ....- ....... . . ..... ... . 7 Room Totals: 269 -32 74 1 s i d i x F r E i `' :1... \Plan 5062.rhv Tuesday, February 13 2014, 3 :19 PM Room Length: 291.2 f1. System Number: 1 s Room Width: 1.0 ft, Zane Number: 1 30.6 Area: 291.0 %ft, Supply Air: 49 CFM Ceiling height: 9.1 ft. Supply Air Changes: 1.1 AC /hr Volume: 2,645,0 cu,ft. Re. Vent. Clg: 0 CFM I Number of Registers: 2 0.661 Actual Winter Vent.: 0 CFM Percent of Supply.; 0 °lam i Room Totals: Actual Summer Vent.: 0 CFM 1,102 f I Percent of Supply: 0 % y Actual Winter lnfil.: 5 CF tt t r P i i i j 7 Actual Summer lnfil.: 5 CFM SF - GIs - Atrium shgc - 0.33 0 %S 8 0.310 21.4 171 30.8 0 246 SF is Atrium shgc - 0.33 O %S 8 0.310 21.4 1 71 30.6 0 246 P -Ceil- 1613 -3 201,2 X 1 ... ... ......... ._........._., 291.2 0.026 1.3 22 1. 0 346 _... ..., Subtotals for Structure: 1,322 0 915 lnfil.: Win.: 5.4, Sum.: 5.4 118 2.855 3:37 0.661 -118 78 AFC3 Fxcursion: 1 C�9 3 Room Totals: 1,659 -11€3 1,102 f I y tt t r P i i i j 7 t E Y:\ :,.\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM 73 ft. System Number: 1 t 121 ft. Zone Number: 1 67 2.865 190 0.661 93.0 sq.ft. Supply Air: 13 CFM 9.1 ft. Supply Air Changes: 0.9 AC/hr k 844.0 cu.ft.. Reef. Vent. -C10: 0 CFM 1 Actual Winter Vent.. 0 CFM F F Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % P Actual Winter lnfil.: 3 CFM Actual Summer lnfil.: 3 CF UP -Cell- 1613-38 92.9 X 1 92.9 0,026 1.8 167 1.2 0 111 Subtotals for Structure: 466 0 160 lnfil.: Win.: 3.1, Sum.: 3.1 67 2.865 190 0.661 -67 ` 44 AE13 Excursion: i Room Totals: 656 -67 226 `t E F t k I P i 7 l S Y:\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 P a Calculation Mode: Htg. & c1g. U65 4.5 Occurrences: I 0 Room Length: 195.8 ft. System Number: I 00.8 Room Width: 1.0 ft. Zone Number: I 351 11 1- -1 Area: 196.0 sq.ft. Supply Air: 70 CFM Ceiling Height: 9.1 ft, Supply Air Changes: 2.4 AC/hr Volume: 1,778.0 cuft Req, Vent. Clg: 0 CFM Number of Registers: 2 Actual Winter Vent.: 0 CFM People: 2001aVpqr, 230 enlpei 1 Percent of Supply.: 0 % 230 Room Totals: Actual Summer Vent.: 0 CFM -54 1,575 Percent of Supply: 0 % Actual Winter Infil.: 12 CFM Actual Summer Infil.: 12 CFM SE -Wa I 1 -1 2 F-Osw 11.5 X 9.1 84.4 U65 4.5 379 0.7 0 62 SE-GIs-Atrium shgc-0.33 O%S 20 0.310 21.4 428 00.8 0 615 UP-Ceil-1613-38 195.8 X 1 . ..... .... 1-1.11 1111111-11111- - 11-11,11,11-11, ---, 195�8 11 "1 11 -1111111111-1 0.026 1.8 - I - 11 111-11111111- I'll- 351 11 1- -1 1.2 I'll 1- -1111.111111.1-1-1111-11111111 0 "" 234 "I'l- - Subtotals for Structure: 1,830 0 I 1,021 Infil.: Win.: 11.7, Sum.: 113 254 2.856 726 0,661 -254 168 AED Excursion: 156 People: 2001aVpqr, 230 enlpei 1 m. 200 230 Room Totals: 2,556 -54 1,575 (:\.,.\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Room Length: 33 ft. System Number: 1 Room Width: 5.3 fit. Zone Number: 1 Area: 44.0 sq.ft. Supply Air: 3 CFM Ceiling Height: 9.1 :ft, Supply Air Changes: 0,4 AC/hr Volume; 403.0 cu,ft. , Req. Vent. Clg: 0 CFM x Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 0 CFM i Actual Summer Infil.: 0 CFM Subtotals for Structure: 80 0 Infil,: Win.: 0.0, Sum.: 0.0 0 0 0 0 0 0 AFC} Excursion: 5 Room Totals. 30 0 59 } i t f E } 1 f pp 1 } I P P i i l I ... \Plan 5052.rhv Tuesday, February 13, 2014, 3:19 P t -. Room Length; 7.5 ft. System Number: 1 Room Width: 12.5 ft. ?one Number: 1 '. Area: 94.0 s.ft. Supply Air: 29 CFM I Ceiling Height. 9.1 ft. Supply Air Changes. 2.0 AC/hr Volume. 852.0 cu.ft. Reel. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.. 0 CFM Percent of Supply. 0 % 1 Actual Summer Vent.: 0 CFM Percent of Supply~ 0 % I Actual Winter lnfil,: 5 CFM Actual Summer Infil. 5 CFM NE -Moor -Rear Entry Door 2.7 X 21.4 0.357 24.6 526 7.9 0 168 8 UP_Ceil- 1613 -38 93.8 X 1 93.8 0.026 . 1.8 166 1.2 0 u '. Subtotals for Structure: 1,107 0 348 Infil.; Win.. 5.2, Sum.. 5.2 114 2.855 324 0.661 -113 7 r AED Excursion: 1111-1111-1-1 . . . _ Room Totals: 1,431 4113 476 Y':\ ... \Plan 5062,rhv Tuesday, February 18, 2014, 3.19 PM Room Length: 179.3 ft. System Number; 1 Room Width: _ 1.0 fit. Zone Number: 1 Area'. 179.0 sq.ft. Supply Air: 54 CFM Coiling Height: 9.1 ft. Supply Air Changes: .0 AC/hr Volume. 1,628.0 cu.ft. . Req. Vent. Clg: 0 CFM t Number of Registers: 1 Actual W inter Vent... 0 CFM Percent of Supply.: 0 % ? Actual Summer Vent. 0 CFM Percent of Supply. 0 % Actual Winter Infil.; 5 CFM Actual Summer Infil.: 5 CFM NW-Wall- I 2F-Osw 11.7 X 9.1 86 0.065 4.5 360 03 0 63 N -(GIs- Atrium shgc- 0,33 0 %S 20 0.310 21.4 428 25.6 0 511 UP-Ceil-1 613-38 1793 X 1 1793 0.026 1.8 322 1.2 0 214 Subtotals for Structure. 1,136 0 733 Infil.. Win.. 4.9, Sum.. 4.9 106 2.859 303 0.661 -106 70 E AED Excursion. 120 x Peo.,... ple. 200 laVper, 230 senlper. , _ _ 1 __ . _ _ _ Wy 200 _ _230 i Room Totals. 1,439 94 1,208 Y: \ -... \Plan 5062.rhv Tuesday, February 18, 2014, 3.19 PM Room Length: 60.4 'ft. System Number: 1 60.4 0.626 - _ 1.8 108 1.2 Room Width:. 1.9 % Zone Plumber: 1 332 Area: 60.0 sg.ft. Supply Air: < 19 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 2.1 AC/hr Volume: 549.0 cu.ft. Reg. Vent. Clg: 6 CFM Number of Registers: 1 Actual Winter Vent.: 6 CFM � Percent of Supply.: 4 % Actual Summer Vent.: 9 CFM Percent of supply: 0 % I Actual Winter Infil.: 4 CFM Actual Summer Inil.: 4 CFM I NW -GIs- Atrium s c -0 33 %S 8 0310 21.4 171 25.6 6 205 � UP -Cell- 1613-36 66.4 1 11 60.4 0.626 - _ 1.8 108 1.2 6 72 Subtotals for Structure: 617 9 332 Infil.: Win.: 3. 8, Sum.: 3.8 83 2.858 338 0.661 -83 55 AED Excursion: 4 Room Totals: 855 -83 436 x : l I I l S t S l E x S g I { 1 y 1 1 ------- -- i � l I I �:1... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Room length. 92 ft. System Number. 1 0 .doom Width. 5,7 ft. Zone Number. 1 i Area. 52.0 si.ft. Supply Air. 3 CF Ceiling Height: 9.1 ft. supply Air Changes: 0,4 AC/hr Volume: 472.0 cu.ft. Req. Vent._Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 r Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 0 CFM Actual Summer Infil.: 0 CFM ':\ ...\Plan 5062.rhv Tuesday, February 16; 2014, 3:19 PM 93 0 0 0 0 0 0 k 93 0 69 1 i i P 3 6 ':\ ...\Plan 5062.rhv Tuesday, February 16; 2014, 3:19 PM Room Length: 149,9 ft. System Number: 1 01 Room Width: 1.0 % Zone Number: 1 4.5 Area: 150.0 sq.ft. Supply Air: 88 CFM Ceiling Height; 9.1 ft. Supply Air Changes: 3.9 AC/hr Volume: 1,362.0 cu.ft. Re q. Vent. Clg: 0 CFM Number of Registers: 2 UP- Ceil- 16B -38 149.9 X 1 _.... .....__. _ . .... . . ... _.. "I._»._ .__ Actual Winter Vent.: 0 CFM 269 _. .,. 1.2 _�..._.. ..._. �.._ 0 . __.. _ _... Percent of Supply.: 0 % i 2,148 Actual Summer Vent.: 0 CFM ' lnfil.: Wirt.: 12.4, Sum.: 12.4 268 Percent of Supply: 0 % -268 178 AFC) Excursion: Actual Winter lnfil.: 12 CFM Actual Summer lnf l.: 12 CFM NF- Well- 12F -0sw 12.7 X 9.1 95 0.065 4.5 426 01 0 70 { SEµWall- 12F-Osw 5 X 9.1 45.8 0.065 4.5 205 0.7 0 3 NW -(pis- Atrium shgc -17.33 O %S 20 9310 21.4 428 25.6 0 511 j F- Cis - Atrium shgc -0.33 O %S 20 0.310 21.4 428 25.6 0 511 UP- Ceil- 16B -38 149.9 X 1 _.... .....__. _ . .... . . ... _.. "I._»._ .__ 149.9 ._.. �.. 0.926 __...._. ....1�., -. 1.8 269 _. .,. 1.2 _�..._.. ..._. �.._ 0 . __.. _ _... 179 _- .. Subtotals for Structure: 2,148 0 1,369 lnfil.: Wirt.: 12.4, Sum.: 12.4 268 2.856 766 0.664 -268 178 AFC) Excursion: 196 People. 200 latlper, 230 sen /per. ..__ .. ...... 1 .......... .. .... ,..... ... .... ....... .. ....... .. ... .. ...... 200 230 Room Totals. 2,914 -68 1,973 k r :\—\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Room Length. 93.1 ft. System Number. 1 0.7 Room Width. 1.0 ft. Zone Number. 1 11.1 Area. 93.0 sq.ft, Supply Air. 38 CEM Ceiling sleight. 9.1 ft. Supply Air Changes. 21 AC/hr r Volume. 846.0 cuft Req. Vent. lg. 0 CI =M Number of Registers. 1 Subtotals for Structure: Actual Winter Vent.. 0 CM 1,358 _.._ ew 0 Percent of Supply.. 0 % I 2.855 527 Actual Summer Vent.. 0 CI =M I AEC? Excursion: _., ...... _ _ _...... Percent of Supply. 0 % ... _ ... 81 Room Totals: Actual Winter Infil.. 9 GPM 1 - 184 Actual Summer Infil.: 9 CEM I SE-Wall-12F-Osw 12 X 9.1 109 0.065 4.5 489 0.7 0 80 = NE- Door -R6.2 Door 3 X 8 24 0.151 11.1 267 3,5 0 85 r NE -pis- Atrium shgc -0.33 O %S 12 0.310 21.4 257 25.6 0 307 UP- Ceil- 16R- 38 X 1 _.. _.d .. e ... _ 03 .1 0.026 _. 1.8 167 _. 1.2 _ .. _ 0 111 � Subtotals for Structure: 1,358 _.._ ew 0 612 ' Infil.: Win.: 8., Sum.: 8.5 185 2.855 527 0.661 -184 122 AEC? Excursion: _., ...... _ _ _...... p _... .. ,..,_ „_ ._ ... _ ... 81 Room Totals: 1 - 184 815 Y : \ ... \Plan 5062.rhv Tuesday, February 18, 2014, :19 PM Room Length: 275.2 ft. System Number: 1 327 Room Width. 1.0 ft. Zone Number. 1 49 Area: 275.0 sq.ft. Supply Air: 22 CFM Ceiling height. 9.1 ft, Supply Air Changes. 0.5 AC/hr Volume. 2,500.0 cu.ft. Req. Vent. Clg. 0 CFM Number of Registers. 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 3 CM Actual Summer Infil.: 3 CFM UP- veil - -3 27.2 X 1 ...m. .�,,...� _ _76.2 �. , .._.... _ , e, e. _. 495 .. w::v ..... ..,, ..,... .� t}„ Subtotals for Structure: 327 0 334 Infil.: Win.: 3.4, Sum.: 3.4 74 2.351 212 0.661 -74 49 AED Excursion: ., , ., _ 43 Room Totals: 1,039 74 431 4 I i i z t `C:t ... \flan 5052.rh r Tuesday, February 13, 2014, 3 :19 PM 1 Rec Room 839 4,582 91 7,7 1,104 -90 61 ; 91 2 Bath 4 52 284 6 3 9 -7 0 6 BR 4 196 1,100 22 6 469 -18 26 22 4 Lint basement 1,664 16,666 211 6,6,6 - 1,903 -225 106 211 5 Great Room 246 4,342 86 7,7, 2,893 -216 161 129 6 Kitchen /Nook 484 4,244 85 8,8 - 5,067, -275 282 227 7 Dining 173 1,470 29 7 - 955 -112 53 4 8 Master BR 306 4,926 98 7,7,7 - 3,742 `223 206 166 9 BUG 19 269 5 3 - 74 -32 4 5 10 Master Bath 291 1,659 33 5,5 1,102 -118 61 49 11 WIC 93 656 13 4 - 226 -67 13 13 { 12 BR 2 196 2,556 51 6,6 1,575 -54 88 70 13 Bath 2 44 80 2 3 _ 59 0 3 3 14 Laundry 94 1,431 29 4 470 -113 26 29 15 BR 3 179 1,439 29 7 1,248 94 67 54 16 Bath 3 60 855 17 4 - 430 -83 24 19 17 PDR 52 93 2 3 - 69 0 4 3 18 Study 150 2,914 58 6,6 - 1,973 -68 114 88 19 Entry 93 1,885 38 5 815 -184 45 38 20 Nall , ... .... .. 276 _ 1,439 .......... ..... 2 . 5 .... ..... ..,..,.. 481 ,.. ..,....,..,,... .,, ,...._. ... -74 .. ,...,...... _. 27 ......_ ... ,. .,..... 22 , ..,.... ,,...,,. , Humidification ., 1,797 ._._System 1 total 5,547 48,227 925 _._ .. , 24,583 1,865 _ __ 1,367 w 1,104 System 1 Main Trunk Size: 25x12 in. Velocity: 527 ft. /rain Loss Per 144 ft.: 0.422 in Duct size results above are from Manual D Ductsize Runout duct velocities are not printed with duct size results from Manual D Ductsize since they can vary within the room. See the Manual D Ductize report for duct velocities and other data. 75444 33444 ` n/a 33,444 Btu n/a 0 Btuh n/a 6395468 YA ...\Plan 5062, rhv Tuesday, February 18, 2414, 3:19 PM - ? aton. _t building ct Reports System 1 Northeast "1,367 - 24, b;3 - -1, Rio 45 0 Bast 1,330 23,969 -1,865 Zone 1:, Southeast 1,259 22,646 - 1,865` 135 South 1,076 19,345 -1,865 1 Rec Room *91 91 91 91 91 91 91 91 7,7 Bath 4 *6 6 6 6 6 6 6 6 3 's BR 4 26 22 25 33 28 22 28 *33 6 4 Unf basement *211 211 211 211 211 211 211 211 6,6,6 5 Great Room 161 *181 140 91 131 160 145 110 7,7 6 Kitchen /Nook 2€32 *315 247 168 231 278 254 196 8,8 i 7 Dining 53 36 51 60 54 40 54 *60 7 1 1 Master BR 206 *211 181 138 175 194 191 159 7,7,7 9 WC *5 5 5 5 5 5 5 5 3 i 10 Master Bath *61 50 59 60 51 38 51 60 5,5 11 WIC *13 13 13 13 13 13 13 13 4 12 BR 2 *88 73 84 85 73 57 73 85 6,6 13 Batts 2 3 *3 3 3 3 3 3 3 14 Laundry *29 29 29 29 29 29 29 29 4 15 Bt 3 67 51 65 72 66 52 66 *72 7 16 Bath 3 24 17 23 26 24 18 24 *26 4 17 PDR 4 *4 4 3 3 3 3 3 3 18 Study 110 108 *112 102 110 102 105 95 6,6 19 Entry 4 *54 47 38 44 48 41 38 5 t 20 Hall 27 *27 26 24 24 24 24 24 * Indicates highest CFM of all rotations. 0" Northeast "1,367 - 24, b;3 - -1, Rio 45 0 Bast 1,330 23,969 -1,865 90 0 Southeast 1,259 22,646 - 1,865` 135 South 1,076 19,345 -1,865 180 Southwest 1,193 21,460 -1,865 225 West 1,193 21,448 -1,865 270 Northwest 1,246 22,413 -1,865 315 North 1,147 20,631 -1,865 !► # # r. #. ` A ...!Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM YA ::. \Plant 506 ,rhv Tuesday, February 16, 2014, 3;19 PM Time of Day Fromdoor faces Northeast Frontdoorfaces past Front door faces Southeast Front door faces South Front doorfaces Southwest Front door faces West Front door faces Northwest Front door faces North YA ... \Plan 506 .rhv Tuesday, February 18, 2014, 3:10 PM Building Flotation Hourly Net Gain i 30,003 ........................................................:................................... i ............................... I �.., . . ...... ..... ............................... .... ...... � .......,., ... 28,000� .. ................... ........ .... ....... ...... ..... ......... ........... { fi P „ t 27, 000 ....................................... ............................... ..� '.... ......, ..,...,..,.,....,....,..:...... . .......... r 23,000 } .......... ... .................. �., 20,000 ..... ... ............,.,.,. ...,..,. ....... � 19,000 ....: .................. ......,... ..,.....,....._....;..... �.,.,. .. . ..... ........:.......... ...... ............................... ......... 17,000 d „..... .... ............. .....:............. .......... ................. ... 16,000 {... .... ....... . ......... ......... ..:...................... .... .................. ......... ........... „ .,... E Sam gam lo 33am 12 pm 1 p 2pm 3pro 4prn 5prn 6pm ?pm Time of Day Fromdoor faces Northeast Frontdoorfaces past Front door faces Southeast Front door faces South Front doorfaces Southwest Front door faces West Front door faces Northwest Front door faces North YA ... \Plan 506 .rhv Tuesday, February 18, 2014, 3:10 PM 'v1 vy .. �� la „ .gym „�, »„„k„.,..,.,„. «,.•�:,.�,..�,�.,, sir , r NOTES i 0 1 CONCERN: • i r.. J }i �yl .LS VV k �1�ryry s• R.rxY V P r 40 •• ° • r r • 4t w � # �f( VI j5 0 SETB 0 #Y"'R F 0 co 4+'r » 0 M M # c M # f 01 io 0 § ;o � _q � > ;u M YY Ri 1 ♦r r zq- WC Y ♦ rY � r 4 r# • • y M � yr Wk 'v1 vy .. �� la „ .gym „�, »„„k„.,..,.,„. «,.•�:,.�,..�,�.,, sir , r 0 • i r.. J }i �yl .LS VV �1�ryry s• R.rxY V r 40 � # �f( VI j5 0 w 0 #Y"'R F 0 co 4+'r » 0 c 0. 01 io 0 § ;o � _q � > ;u M r w M rri zq- . r 4 r# C 6 J 0 yr 0 a+r r • • M Ha rr r 8 LA • r M w # 'v1 vy .. �� la „ .gym „�, »„„k„.,..,.,„. «,.•�:,.�,..�,�.,, sir , r 0 i r.. J �yl .LS VV �1�ryry s• R.rxY V r 40 �f( j5 0 0 #Y"'R F 0 co 4+'r » 0 c 0. 01 io 0 § ;o � _q � > ;u M r w M rri zq- r 4 C 6 J 0 yr 0 • • 4 0 5cr* S130 MAWR • m > c: 4 0 z • PC 0" ♦ n -4 0 0 r 0 0 NOTES OF CONCERN: er 60 • ii 8 A • 9, • •ci • .;n SETBACK • DIMENSI > • • 4 0 5cr* S130 MAWR • m > c: 4 0 z • PC 0" ♦ n -4 0 0 r 0 0 er 60 • ii 8 A • 9, • •ci .;n Z. > wr i r . 11 • > 0 p A 54 1 - 4 , 0 ! 2c: m • OM M Z' > OZ =1 0 F- 0 • • 4 0 5cr* S130 MAWR • m > c: 4 0 z • PC 0" ♦ n -4 0 0 r 0 0 r 0 i • } Jl ER NOTES OF t � ml [�i l SETBAC w ��i Il , O �i I S a w r r • `tF •.`.- IISI 14 *IIAI MI µ II - }` I� Mn :xti X gzl# ' :.. M +! ► IIA w w 16t ie � w ; w w O w w w 14 • * op • t • • � 1 w Y w � ^' M ig ♦4 {Y Yi 0V ♦ w w 4 • w w *re .... • r 0 i • } Jl ER r s rr feet rom water heater i riw 1ayln* ° ('_r-AA f'rillp -14YU SR-36Q,6",22 CFM,Reg :lO 4 SR -1201 } 7",55 FM,Reg.10lx4 SR - 1501, a' ",25 FM,R g 1601,4 ",13 FM,Req :1Ox4 SR- 1801,6 "',35 cFM,ReR.101x4 SR- 1301 } 3 ",5 cFM }ReR.101x4 SR- 170} } 6 °',35 FM }Re.101x4 * CFM VEN IRE 'M L^ RGEST Install Balancing Dampers on All Supplies SR- 1401,5",25 CFM,R { A ll x •• Zi rnw. .. jai ..tl.'.Sty a.. �1 YeiL ...S,.ui } .SS..ui. Li. 1.u'u 1,.,sn ..Luau, u.._ v�SS:u5,s5. ax ,....Y.ud:b +S V_..v�..5.t�� .r �• � , �, _, x ,u :t. x .�ss;...> - � iw.. .v. -. sv � i , ae�.. ,�, `i'i".# 20,7 :1 OXF R- 15005 Aai'"'1Y,Reg:1Vx 3R #60,4 .g:tOx4 R 4+FdY1E7Reg: Ox4 SR•130,3 ",5 CFM,Recg:10x4 SR-170,6",35 CFM,Reg: ` P GIVEN HERE ARE THE WG R- 140,5 "', 5 CFM,R cg:10x4 11 '� n mnu m IA ArMIA r rM Install Balancing Dampers on All Supplies I City of W3.6atR I d C ,,,�g COMMUNny DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033-8001 P: 303,235.2846 F: 301235,2857 March 20, 2014 OFFICIAL ADDRESS NOTIFICA Z2IR!EAjMNMP CODE CORRECTION NOTIFICATION is hereby given that the following address has been assigned to the property/properties as indicated below: PROPERTY OWNER(S): Standard PaciFic of Colorado Inc. A Delaware Ca ration OLD ADDRESS: None '90 abor Cr. Wheat Ri d e Co '0033 '0 NEW ADDRESS: 3 "0 't'ab � or Ct. 80033 Block 1_ Lo t25 3870 ab I or Ct. 80033 033 3 60 1, ab 8 or Ct Ile t Ri e C W 0�810033 80033 3 5 Ta b or 8 0 T or Cr. Ct W heat R i C e 081 Blac o 'oc t 2 8 Block 1 -Lor 6 3801 Taft Ct. Wheat Rtd e C{ 3 3830 T abor Ct. Tab block l _ I of 3819 `Taft Ct, Wheat I2id e CC) 3 Black 1 Lor 9 3829 Taff Ct. Wheat Rzd CC 3 Black t -Lot 10 3839 "Taft Ct. Wear Rid e CC? 33 Stock l _Lot 11 384 Tafr Ct. Wheat Rid e C) 33 Black 1 -Lor 12 38E9 Tafil Ct. Wheat laid >e C( 33 33 Block I Lot t4 3889 Taft Ct. Wheat Rid e CCU 33 'oc "o' '90 abor Cr. Wheat Ri d e Co '0033 '0 Block I - Lot 4 3 "0 't'ab � or Ct. W heat: e R id 80033 Block 1_ Lo t25 3870 ab I or Ct. Wheat Ri e 0 80033 C B l ack 1 Lot 26 3 60 1, ab 8 or Ct Ile t Ri e C W 0�810033 S to c k Lot .1 1 7 3 5 Ta b or 8 0 T or Cr. Ct W heat R i C e 081 Blac o 'oc t 2 8 384 Ta b 0 or Ct' t R ea 80 0 0033 d e �Q� : Mac k 2 I -ot 9 3830 T abor Ct. Tab i Co hea R �e 33 �( 8 � �ock I Lot 30 38 0 or Ct Wheat Co e R id 80�033 3 Black 2 - Ilot 3 383E `Taft Ct. Wheat. Rid e CCU 80033 Black 2 - Lat 4 3848 Taft Ct. Wheat Rid e fC} 3 3 33 WWWA-Wheatridgexo.us I 1] IM1 4 JIM I I I 101 (Block l,ot 1 2 3871 Tabor Q. Wheat Rid (Block 2 – Lot 13) 3861 Tabor Ct.,Wheat Ridge, co 8o033 Block 2 -• -Lot 14 3851 Taber Ct. Wheat Rid e CC) 80033 (Block 2 -.- Lot 15113841 Tabor Ct,,Wheat Ridg cO 80033 fRIA01- I – T tit I Al 'A R I I 'rnl nr Of 1X71-4 DA,.- f^t onlill SUIRDIVISION: Doud Overlook Subdivision aka Fireside at Youn field Subdivision LOT(S): KEY: SECTION: — JEFFERSON COUNTY RECEPTION #: 2013143668 9mmmusm NOTES: This is a courtesy notification, AUTHORIZED BY. DATE: JUL-11timu NOTE: Please notify all other parties concerned. ADDRESS MAP UPDATED BY: DATE: R69W 601 ALUM. PPE W/ 3 -1/4 GRASS CAR EO STAMP LS 13212' N RANK 8O% PONT 14109 N-708326.7466 E- 1025512566 T35, P.2' I I I I 1 I i I I I I I� i� 1 I, M la IY� IW I I LOT 11 3819 0710 38M P p TV s s O 11858 11842 11828 NEST 39TH PLACE 0 2 1871 11851 RP 11831 G 2 11811 • 0 0 o s 398 H.O.A. C 3881 LOT 7 LOT 12 3884 3871 LOT 6 LANDSCAPING 3872 LOT 13 3881 LOT 5 C 3550 LOT 14 I 3851 3821 LOT 4 3848 LOT 15 3841 LOT 3 3836 1 <\ 1 0 LOT 22 11810 TRACT 8 E. 1/4 CORO" SEC. 20 T35, R69W 6TH P.Y. S AIW. i'Pf W/ 3 !BASS CAP l STAIIREEI ,313=13- N RAHOE E01 05310 ADDRESS PLAT PONT 14209 11212' N 9 RA" 0.1 a•0 DOUD OVERLOOK SUBDIVISION FILING NO. 2 BEING A REPLAT OF A PORTION OF DOUD OVERLOOK SUBDIVISION, --� LOCATED IN THE WEST HALF OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 20 AND THE WEST HALF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 29, `s TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN, I CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO 48 LOTS, 5 TRACTS & PUBLIC R.O.W. — 14.872 ACRES I 1 r 1 LOT 23 3890 1 rI �1 I TRACT USE I A 1 HO.A LOT 16 3831 1 H.O.A. C t UTUTE3 LOT if D UTRITES DRAINAGE k EYEROENCY ACCESS LOT 2 E LANDSCAPING N.O.A. TRACT C 3889.5 LOT 14 C 3m I 3824 3821 LOT 24 3880 h LOT 25 3870 M I LOT 26 3880 LOT 27 3850 LOT 28 3840 LOT 29 3830 1 * I LOT 17 - - - - * I j I 1 3812 11831 O M LOT 8 LOT 1 _ LOT 30 MI 3819 O 11871 3820 1 C I y8T11 PU►_�� POINT a T LS ,ea7 _r LOT 7 w -' TW •1RACT 0 LOT 31 + Lr 11820 t — 'a UN v K I? 3610 BRASS CAP y1p 11880 c r�oR7risioo 1331:• N RANK NI2 I 11890 11880 1 N- 7056727126 E- 1025618715 I 3801 W N O 3800.5 1RACT SE 1/4 SEC. 20� CAP 1 0 of ��` `� 1M►Tf �— _—J DD05TM0 \ I I2' LIB I N I I 1 I I IR TRACT USE TABLE TRACT USE OWNER A LANDSCAPING HO.A 8 DETEMI110H POND k VTMUTES H.O.A. C t UTUTE3 H.O.A. D UTRITES DRAINAGE k EYEROENCY ACCESS H.O.A. E LANDSCAPING N.O.A. 1 N N.O.A. -HOME OWNERS ASSOCIATION 1� I I I IEOE10 1 Nlocx ,RrLR SICWaR COINER R4W. RMT -OF -MY "ammy Lm LOT LINE 0057N0 PLATS rz:71cm uw ROAD O911ER Lm I x I 1 -4 POINT Of OMSV ICDIENT BE CORRNf SEC 20 TM. RRf 6TH P.Y. AWL PPE W/ 3-1/4 BRASS CAP STATED. %S 13512' N RANK BOX PONT ism — — N-705701.5458 E.1052301675 I I— 'SCALE: 1" - 60' CPI Vry.AL tPAOM: _:..LI DEVELOPER ENGINEER \SURVEYOR rlr`■rsn.�6 *"DAIQDPACtfjcHomjs CA RROLL& LA NGE- MA N HARD •/•RV6,Nro anLelA1►a aoYRWPn V A .P. a •et1`..- ��ira: �WriWR.i...�ow1• LOT 16 i LOT 17 11874 ' 1182'0 LOT 16 { I 3901 I 11900 I I LOT 15 V 3899 1 1 I TRACT C 3889.5 LOT 14 1 I 3WO I f LOT 13 j 3879 LOT 12 i � � "� d 3889 I