Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
4761 Carr Street
A i CITY OF WHEAT RIDGE _��9rBuilding Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: LAA 'E44— Job Address: �-'- Permit Number: <", ❑ No one available for inspection: Time 4 AM/P Re -Inspection required: Yes- k11,40 When corrections have been made, call for re -inspection at 303 -234 - Date: jam_ Inspector: DO NOT REMOVE THIS NOTICE A City of Wheat Ridge Residential Sewer Repair PERMIT - 201900927 PERMIT NO: 201900927 ISSUED: 05/08/2019 JOB ADDRESS: 4761 Carr St EXPIRES: 05/07/2020 JOB DESCRIPTION: Residential sewer line, 8 feet in front yard, SDR 35 strongback coupling squeegee. *** CONTACTS *** OWNER (720)885-7735 MASSEY JOHN C III SUB (303)287-9009 BRAD WAKEHAM 130022 TRENCH RIGHT LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2002 / KIPLING, I-70 & CLEARCREEK ARE BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 5,800.00 FEES Total Valuation 0.00 Use Tax 121.80 Permit Fee 140.90 ** TOTAL ** 262.70 *** COMMENTS *** *** CONDITIONS *** ALL sewer repair/replacements for which a permit is issued MUST be inspected by and receive written approval from the City of Wheat Ridge BUILDING DIVISION, regardless of inspection by any Sanitation District representative. Inspection and approval of work by any Sanitation District representative DOES NOT grant authority to cover work without the approval of the Building Division. **For trenchless sewer replacements - The contractor will verify proper slope of new sewer piping in conformance with the IRC and IPC of 1/4 inch per foot unless otherwise allowed specifically by the applicable code. The plumbing contractor will provide verification of proper slope and drainage in writing as a condition of approval of the permitted work.** PERMIT NO: JOB ADDRESS: JOB DESCRIPTION City of Wheat Ridge Residential Sewer Repair PERMIT - 201900927 201900927 4761 Carr St ISSUED: 05/08/2019 EXPIRES: 05/07/2020 Residential sewer line, 8 feet in front yard, SDR 35 strongback coupling squeegee. I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with thispermrt. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed and that al work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Sign e o OVNER or CONTRACTOR (Circle one) Date 1, Ahis permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder s all notify the Building and Inspection Services Division in accordance with established policy of all required in tons and shal t proceed or conceal work without written approval of such work from the Building and Inspection Services D'. is' n. 6. ssua a or gr of permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any de ce or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City of �W heat R.,jgE MUNiTy DEVELOPMENT Building & Inspection Services 7500 W. 29th Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permits(@ci.wheatridge.co.us FOR OFFICE USE ONLY Date: D /6�5 Plan/Permit # l l6C�9��- Plan Review Fee: Building Permit Application *** Complete all applicable highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: 5r'7y/l 1'_'f�4" --57- Property -5i Property Owner (please print):y� !f � 55'k- Phone:' Property Owner Email: Tenant Name (Commercial Projects Only) Property Owner Mailing Address: (if different than property address) Address: City, State, Zip: Architect/Engineer E-mail: Contractor Name: Phone: City of Wheat Ridge License M Phone: tis ss 7 nira�; Contractor E-mail Address: `37ae�' For Plan Review Questions & Com me is (please print): CONTACT NAME (please print): Phone: :Z�ej;,R CONTACT EMAIL(p/ease print): Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form): Electrical: Plumbing: Mechanical: W.R. City License # W.R. City License # W.R. City License # Other City Licensed Sub: Other City Licensed Sub: City License # City License # Complete all highlighted fields, if applicable. ❑COMMERCIAL ESIDENTIAL Provide description of work: For ALL projects, provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc. h Sq. FULF BTUs Gallons Amps Squares For Solar: KW # of Panels Requires Structural For Commercial Projects Only: Occupancy Type: Construction Type: Occupancy Load: Square Footage: Project Value: (Contract value or the cost of all materials and labor included in the entire project) OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record: that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. 1, the applicant for this building permit application. warrant the truthfulness of the information provided on the application. CIRCLE ONE: (0WNER) (C NTR�;W Signature (first and last name): Printed Name: ZONING COMMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer: PUBLIC WORKS COMMENTS: Reviewer: REPRESENTATIVE) of (OWNER) (CONTRACTOR) U DEPARTMENT USE ONLY DATE: 5 OCCUPANCY CLASSIFICATION: CONSTRUCTION TYPE: Building Division Valuation: Permit #:201300319 Issued: 08/08/2013 Stipulations: Replace Roof, Insulation, Electrical, Plumbing Fixtures and Drywall Due to Fire. This certificate verifies that the building constructed and/or the use proposed of the building and/or premises, under the above permit number and ♦ property described below, does comply with the Wheat Ridge Building Code and development standards of the zone district in which it is located and may be occupied. All other licensing requirements for the City must be met. Owner: MASSEY JOHN C III 04761 CARR ST WHEAT RIDGE CO 80033-3124 Contractor: Belfor USA 185 OAKLAND AVE STE 150 BIRMINGHAM MI 48009-3430 • C, Contractor License M o : Sub Contractors: q_ ____ License #L.___ Expiration Date: .. • — App r o val. iew (due at tirne of submittal): 4k Save these instructions for future reference # Hearth-Stove Approved HOT GLASS WILL.. Ct',IJGE BURNS DO NOT TOUCH (.,LAS'S UNT�L. 000LED NEVER ALLOW CHILDREN T'0 (1"')L1_"kSS SAFLE W N0710E: If this appliance Is not properly installed, a house fire rnay resuft. For your safety, follow the installabon directions. Contact local building or fire officials about restdctions and installation inspection requirements in your area. Travis Industries, Inc. 4800 Harbour Pointe Blvd. SVV Mukilteo, VVA 98275 mmtravisproducts.com Copytight ' O, Travis InclUstries, Inc. $10.00 100-01178 000 4101006 Important Information No other 1 appliance has the sarne serial number as yours, The serial number is stamped onto the label on the back of the appliance, This serial number \Mll be needed in case you require service of any type. Model: 1250 (P Travis I nclustries 100-01178 40810219 General Information Introduction &Important Information....--__.~.~'2 Safety Precautions -.-..-_-_............. ----'4 Planning the Installation. --.-------.,.-..-7 PeparatimnMx 7 Stove Installation Considerations 7 Floor Pn*eotimnRequkements -- 8 Stove Placement Requirements ...... ---'_.'.-..8 Clearancem...- ... _._~_~___.~_.~..__.-8 TmpView - Straigb Installation.. -.. 9 TopView - Corne/ 9 Chimney Connector Requirmants .-_._-_ ...... -....10 Chimney Requirements -_..-_.-.__....... .---M Chimney Termination Requhements- ...... -_..--.12 Outside Air Requkemmnts— ... ........ --'__.__-i2 Alcove Installation Requirements .... ...._.~.-.~.-1l Mobile Home Requhementm.. ... ..-....... ...... -...... 14 INSTALLATION DIAGRAMS Standard Coiling with m Factory Built Cbbnmey._.o5 Cathedral Ceiling with a Factory Buil ChAnnmy._|5 Hearth Stove Positive Connection- ... -----16 Hearth Stove Direct Connection 17 Interior or Exterior Masonry 17 Safety Is Operating theStovewhenKis�o- --_---- Before Your First Fke_~_~ ...... _-----_—_-�1� Curing t Pain ............ ............... --_~_-_IS Over-Firing t Stove ...._.__-__.__....-..,1@ Opening the ......... ----......... '18 Starting a Fire_ ... .......... 20 Adjusting the Burn Rate --------------_21 Approximate Air Control Settings ... �211 Ash Remave-----__.-----.__~_--21 34 BloweOperation---._--_._--.-------22 25 Re-Loading the Stove., 2� Overnight Bum ... --_-------...... --.--.22 34 Normal Operating 22 Hi nts for Burning ._._..-._~—....... ~._.......... 21J Selecting Wood ...... __.~~-_........ .--_-....... '23 Why Dry Wood isK*y.'.— ... .~__-__.2D 27 Wood Cutting and S tonaye.,~~ ... ------23 27 Troubleshooting ........... ...... .-----_--...... 24 Daily Maintenance awhile, stove IsAn use) ..... ---_. 34 Remove Ash (if necessary) ......... 25 Clean the Glass tit necessary) ... ....... 25 Monthly Maintenance (while appliance bIn use) --,26 34 Dom and Glass Inspection 26 Creosote ~ Formation and Need for Remova _..26 Yearly Maintenance ..... _. ... .... ........ _--.----'27 T*umhOp Pain ...... ....... — ... -....... 27 Cleaning the Air Duct and Blower (if applicable 27 Door Partm- ... ....... .-_---.------__..-28 Replacing the Glass --------_....._.-._...2G Replacing the Door Gasket . ....... -._.-.-~-..Zg Replacing the Door Handle 28 Firebox Paris ... ._._.-..--_----'__-^-_-'2g SdckRemoval& RepbcememN.__.-. ...... _-'.Q8 Air Tube Removal & Replacement ......... 30 Baffle Removal & Warranty Stove Leg |nm#mlladion__.... 34 Pedestal Installation .._.._...__.......... .__.-...34 Rear Slower |mstadlaUmn.-. ..... ....-.....~__-._~35 Outside Air Connector ...... 34 Index Index ................ _......~—........... _---...... 36 7 ; The viewing clog must be closed and latched during operation . a • � s r r � w and placed on a non- Keep furniture, drapes, curtains. wood, paper, and other combustibles a minimurn of 36" (14mm) awa from the front of the appliance, Do not store fuel under or around the appliance. • Q Travis IndUst €°i s 100-01178 4 081021 Never hy to repair or replace Maintain the door and glass seal and keep them in good condition. Avoid placing wood against th glass when loading. Do not Do not throw this manual away. This manual has important operating and maintenance instructions that you will need at a later time. Always follow the instructions in this manual. Do not make any changes or modifications to an existing masonry fireplace or chimney to install this appliance. Do not make any changes to the appliance to increase combustion air, Overfiring the appliance may cause a house fire. If a unit or chimney connector glows, you are overfiring. Do not use a grate or other the firebox floor. Burn the lire directly on the brii*s, Travis Industries. Inc. grants 0 Travis Industries 100-01178 4081 Heating ,Specifications Approximate MaXinlUm Heating Capacity (in sgUare feet)' 600 to 1,200 Figure I Emissions 4.4 Grams Per Haar (EPA Phase II Approved) —Tests conducted by E.E. .P.C. Q Travis Industries 100-01178 40810"9 bef 0 1101 Please read this entire manual • use y our new room • buil follow instructions may result in property damage, bodily injury, or even death. Contact local . offi o d i i your area. Always use gloves when operating a hot stove. The door handle and other components become very hot during normal use. Prepara for Installation AM The stove can be lightened by removing the firebricks and baffle (pg. 29) - replace before operation. Check for damage to the exterior of the storve, Check the interior of the firebox (replace Cracked firebrick and make sure baffle is in a w place), The pipe heat • The stove must be installed with the legs { see shield is slipped d inside the stove. page 4) or pedestal (see page ). .wv :w 'J. " slide itsnto the • Install the pipe heat shield following the ,, � � n convection directions in Figure 2, ` charnber and secure it with the three s crews included in the Stove In sta ll at ion Conside W r' owner's pacR 4 4 Figure 2 The table below details the six most common types of installations and the considerations for each type. Alternative methods of installation are available if they comply with local building codes. Installation T + P Considerations .w_ __._,r,-- ......_._.. Standard Cei ling with a Factory Built C himney I + Requires ceiling and rant penetration (Wage 15) Provides ('rest draft Cathedral Ceiling with a Factory wilt Chimney • Cathedral style chimney support required (Page 1) # Provides best draft s dearth Move Positive Connection • utilizes existing masonry fireplace Snot approved for zero de art<<e (Pape 16) (metal) fireplaces) Provides good draft due to full refine .. ... .. ..,. • _Ea to clears th at direc or h oriz o nta l hearth stove * r Hearth tClYe C` sect Connection i71i eS eXESting masonry ffr'e aCe (riot aPptoved for' zeP 4 clew anr.e._,_,�: (Page 17) f i r e p laces) : Requires construction of a "Mock -off plate Draft reduced due to elbows & c ss section [ Interior Masonry Chrrrrney 1 ' Utilizes existing masonry chimney (riot approved for zero clearance f (Page 17) (metal) fireplaces) (9 Travis industries 100 -0117 408 102-9 Stove Placement Requirements Clearances may be reduced by methods specified in ra 211, listed wall shields, pipe shields, or other means approved by local building or fire officials, • Stove must be placed so that no combustibles are within, or can swing within (e.g., drapes, doors), 36" (914mm) of the front of the stove. • If the stove is placed in a location where the ceiling height is less than T )3134mrn), it must follow the requirements in the section "Alcove Installation Requirements", • Must maintain the clearances to combustibles listed below (drywall, furniture, etc.): Clearances The following clearances must be met (see Figure 3 and Figure 4) Clearance Requirements inglewall Connector i Reduced Clearance* A Sidewall to stove 16" 457mm 16 457mm 13 Eackv ll to stove 16" 457mm '10 -112'" 267mm r Comerwall to stove 10" 254mm 16 " 2 4mm D Connector to side 11 7° 656mm 26 -1C3' 673mm Connector to back wall '15 -1t4" 489nim 11 -1/4" 366mm F Connector to cornerwall 17 -3/4" 451 mm 17-1/4" 436mm Side & Rear Floor Protector 1 6" 152mm (US) ? 6" 15mm (US) 6" 260mm (Canada) 6 "° 200mm (Canada) H Front Floor protector 16 " 406mm (US) 16 "446mm (US) 16 45 MIVI (Canada) 16" 45t?Ita1M (Canada) 0 Travis I ndustries 100-01178 408 10129 ,373 mm, - r and side Measure i ea clearances from the nearest edge of the stove top. NOT vent diameter varies H depending on brand and model. Floor Protection Measure front clearances from the race of the stove (untbody) Figure 3 Top View - Corner Installation Measure rear and side clearances from the nearest edge of the stove top, sO TE: vent diameter varies lepending on brand and model leasure front clearances firm re race of Vie stove (unitiody). Figure 4 Q Travis Industries 100-01178 40 8 1029 IM . :C on nector Requirement Chimney ter. is required collar of the Figure 6'Y or masonry chimney (see Figures 13, 14, and'i 5). L On s, gl # e ƒ S \> : the crimped end poi nts downward. MM - The t%A,ey connector must e fastened to the stove andl each adjoining mA (and chimney). U Travis !§dum,`@S 100-01178 �408}0}9 Chimney Cali .. (See the section "Chimney Termination Requirements for more details) Factory l3udlt Chimney Sections Floor Penetration Equipment (Attic Radiation Shield with Chimney Support) Reduced Clearance Chi nev ORMEORUM Floor Protection Minimum System 15'(4 57M) Maximum System 33'(10.05M) Roof Penetration Equipment (Roof Radiation Shield, Flashing, Storm Collar) Minimum Air Space to Combustibles (See Chimney Manufacturers Standard residential Installations with reduced clearance connector may use the clearance determined by the manufacturer of the connector for the connector to wall clearance or the clearance listed in this manual Mobile horne installations must use the the reduced clearance connector clearances listed in this manual under 'Additional Requirements for Mobile Home Installations ". Stove Clearance (as outlined in this manual) r A *Travis vis 1ndustrw s 100-011 4081029 k Min 2'(610mm) Min.. 3'(914nim) 10r (3 04M) ... .... ........ Min 3'(914mm) Pedestal or outside ar boot may be used to drect air from below the stove. See the pedestal crawl space or use an air duct Min. 2'(610mm) 1O (3,04M) The pedestal has an open in g for use with outside air connectia This all ovys air to be drawn from behind th pedestal, Outside Air Ccnnector 06tside air entrance must be placed so it does not become blocked by snow. W= *Travis I ndustries 100-01178 40810 9 Minimum Clearance {See the Figure 5 below) Combustible Alcove Non - Combustible Alcove Aieall tr, stave l"__.___.m 57n1 .w__. 203mm _...__ B Backwall to stove '10-1/2' 267mm " 51mm Connector to sidewall 26 -112" 673mm 16 -11 " 419mm x Connector to back wall 11 -114" 286mm 3 -11 "" 64mm Maximum depth of alcove 12 19 mm 48 12 9mm H Minimum vAdth of alcove 59-5/8" 1514mm i 39-5/8' 1006mm J Minimum height of alcove 84" 2134mm 6" (1 2mm) above Am 100-01178 0 9 M ob il e Home R 0 Outside air must be installed -see "Outside Air STRAIGHT INSTALLATION 'R 4 D . F v f.. , 4 . A . A r» Connector A Sidewall to stove 18 °" 457mm h w 10 -1d2" 2 7mm C Corner all to stove 10" 54n rn v f.. , Measure tear clearances from the edge of the stove top.. not the rear heat shield. Minimum Clearance Reduced Clearance (See the illustration above) Connector A Sidewall to stove 18 °" 457mm 13 Back wall to stove 10 -1d2" 2 7mm C Corner all to stove 10" 54n rn D Connector to side wall 26-1/2" 7 rnm E Connector to backwall 11 -1/4" 2 F Connector to corner ll 17-1/4" 438m 2' Min MMM) Connector Clearance (as outlined above) Stove Clearance (as outlined above) Figure 11 Travis Inclustri s 100 -01178 40810"0 Standard Ce iling Chimney Cap _ _.. _ - , "Chimney tSee the section .... wit a Factory Termination Requirements" Follow the chimney Built Chimney for more details) ,v manufacturers instructions anti clearances for roof penetrations. A storm collar Chimney Sections �. ,,. and flashing are required (some require a radiation Insulation . *• n `"' shield). Follow the chimney m y manufacturer's instructions ` Minimum Air Space to and clearances for door w . � �" Combustibles (See penetrations. A ceiling Chimney Manufacturers support is requited, an attic Instructions) insulation shield Is required w Vullere insulation is present. Minimum 15' Chimney Connector Sections (4.57M) Maximum 33' (10.05m) Floor Protection "Floor Move Clearances (See the section )See the section "Stave Protection Requirements" Placement Requirements" for more details) for more details) Figure 1 Cathedral Ceiling Chimney Cap ....... .. .. ; . With a Factory (See the section "Chimney Built Chimney � ermination Requirements "' Follow the chimney far Wrote details) ,�.�!"" manufacturer's Instructions and clearances for roof Chimney Sections °� "� �* penetrations. A storm collar, flashing. and Minimum Air Space to cathedral style chimney Combustibles (See Chimney support are required Manufacturer's Instructions) isome require a radiation shield). Minimum 15' Chimney (4,57M) Connector Maximum 33' Sections t 10 .05m) Floor Protection tSee the section "Floor Stave Clearances Protection Requirements " (See the Section "Stave for more details) Placement Requirements" for mote details) t h 4 Figure 13 Travis Industries 100-01178 40810 0 Exterior F actory __.. 4 Follow the chimney isee the section Whitt Chimney Chimney C cti on "Chimney manufacturer's ,. Termina RegtRequirements" insttttctios and clearances for roof NOTE: for more details) P enetrations. A storm u° Sections collar and Hashing are Ex terior chimneys are Chimney ` required (some subject to greater Minimum Alt pace to _ _ w _ . - -«� requite a radiation moisture and creosote Combustibles (See shield). accumulation titre to the Chirriney Manufacturer's Wall Sands lower temperatures. An )Minimum 15" t4.5{f�ti insulated chase will Instructions) and Maximum 33'(10,06M) reduce these supports accumulations +tlte Min. 18" , Insulated Tee 457mmp #with cleanout proper er clearances to the � + t clearance to chimney must be ceilin Follow the chimney maintained). ranufacturer "s instructions and Chimney Connector clearances for wall Se ction s imne }penetrations. A „ wall radiation shield Floor Protection ' ` (thimble) is )See "Floor required. Ptotec #lon Move Clearances Requirements" )See the section ' "Move Optional for detallsi Placement Requitements"" insulated for more details) chase ��rr Figure 1 Hearth Stove � �. � w..w. .__ Cap and flashing pr @ vents mater from Positive e rltering NOTE The entire fireplace and Connection chimney must be clean, undamaged, an meet all 1 cai building codes NOTE (U C, etc.). am ado m stbe repaired phorto insialiation The Most factory -built chimney roust be 15' (4,57M) to 33' chimney manufacturers (10,05m) tall, make stainless steel � . The inner must be stainless steel connector chimney liners, either r flexible vent Follow flexible or rigid. This tte Inner manufacturer's provides a wide variety i st ctinns for installation _..... of installation options. Make sure to follow the Combustible manufacturer's Mantle �s instructions for Ivlirr (457rnm) w Arrti ht Vulated Cle re- installation and support. Remove darn er or wire it open F oot Protection See the section Floor Protection s Requirements'° _ `gee the section for more details) �� _ ....... - Move Bracer ent Requirements" for ininrrnurn clearances required. Figure 15 Travis I 100-01178 40 8 10 9 0 IIESit, installation of an airtight, See the section "Stove Placement Requirements" for minimum clearances required Chimney connector sections Clay Liner Stainless steel chime .y connector must xtend 1'past the block--off plate or to the fine finer 'Airti 4 Il?su at�d Clea ' ut Block-off plate or damper adapter See the section j4! ove Placement quirements" for mintrrium clearances required Figure 16 May Liner Min. 18" (457mm) clearance to ceiling 1 This type. of ... , � ;, . .. 7 ins a a ton regattas a USC approved masonry connector or a factory built (U ,L Listed) wall thimble Make sure the Mean -out seals in place WEMM Safety Notice If this appliance is not properly installed, a house fire may result. For your safety, follow the installation directions. Contact local building or fire officials about restrictions and installation inspection requirements in your area. Read and follow all of the warnings on pages 4 and 5 of this manual. MMBZM3M2E= Before starting the stove, verify that the stove is properly installed and all of the requirements in this manual have been followed. Keep all flammable materials 36" away from the front of the stove (drapes, furniture, clothing, etc.}. 7 1'his stove was designed to operate at a high temperature. But due to differences in vent configuration, fuel. and draft. this appliance can be operated at an excessive temperature, If the stovetop or other area starts to glow red, you are over-firing the stove, Shut the air control do" to low and allow the stove to coot before proceeding, rza I I I gu y. I I I 1 2 3 Is i M ZZ11 'Am [dim V, I I jTMOj I in LO V-4 raq wyva it I MV-1 tit WA I I Wel a a I Irmw I a r 111 0 Travis Industries 100-01178 40810" Opening the Door The door becomes hot during use. Use a glove to open the door if the handle is hot, W���M Rotate the door handle, Em Sm C Travis I nclUstries 100-01178 40810219 Llmlimnmr-momm Q Travis I ndustries 100-01178 40810 -2 W 0 he Sum Rate ORM _tl Use the air control slider to control the burn rate of the stove. See the illustration below for details, 11=111MEMOMMA The air control becomes hot during operation - use gloves or a tool to prevent burns. The air control may take several minutes to influence the burn rate. When making adjUstrrients, you may wish to let the stove bum for 10 minutes to gauge performance. C► Ashes should be placed in a metal container with a tight fitting lid. Other waste is not placed in this container, The closed container • ashes should be placed on a non-combustible floor or on the grund, away tom all combustible materials, pending final dispo • o o sal. If the ashes are o dispsed of by burial in sil or otherwise lcally dispersed, they should be retained in the clsed 77 o container until all cinders have thoroughly cooled. Q Travis I ridustries 100-01178 40810 Optional • Operation ., 'nie blower is available to assist the convection your below detail the options you have with the blower and the best method for operation. OFF HIGH LOW Tcrn the dial aff the way counter- The high postlon is al the way courtier- Turn the dal sit Me clockv4se ur&tl it clicks oft clockwise, #"otq_ clicking oft. WW cioc 3 tT s AM The blower may be used to affect heat output (i.e., to reduce heat output, turn the blower down).. R oute the pcivter coat in a location where if will not come in contact wM the appliance or become ducat. Re- Loading the Stave Follow the directions below to minimize smoke o spillage while re- loading the stove. I Open the air control all the way (push it in). Open the door slightly. Let the airflow inside the firebox to stabilize before opening the doors fully. 3 load wood onto the fire. Overnight Sure This stove is large enough to accommodate burn times up to eight hours. Follow tile steps belowto achieve an overnight burn. N ormal a « So unds Creaks and Cricks The steel may creak or click when the stove heats up and cools down - this is normal. loyver c ls: The blower will make a slight "hum m" as it pushes air through the stove Hint:. Make sure the leveling efts on leas are extended - preventing the hearth from amplifying any vibrations, p f CT'ravis It1 lustries 100-01178 0 4 29 Hints for Burning • Get the appliance hot before adjusting to low bum * Use smaller pieces of wood during start-up and high burns to increase temperature 0 Use larger pieces of wood for overnight or sustained burns 0 Stack the wood tightly together to establish a longer burn • Leave a bed of ashes (1 /2" deep) to allow for longer burns • Be considerate of neighbors & the environment: burn dry wood only • Burn small, intense fires instead of large, slow burning fires when possible • Learn your appliance's operating characteristics to obtain optirnum perforniance MMMWK��� IIIIIIIIII'llill!IIII'lill 11lilliIIIIII !!Ie!IjlII!lI!lll It 11 a nampers a COMPIele PUVFI� A5K any experfenceq Wocia Durner ano Re or sne VAR agr" wood is crucial to good performance. ?d to 1? ,n a e yth and R o'p"Ion O qu S, Store the wood off th ? n a o covered area, Ahow ai w aroun the wood to dry the wood. i IPAPW W *4AWA- , ;M 0 Travis I nclustries 100-01178 408 10120 Q Travis Industries 100-01178 40810'2 Tr ou bblesiroo ling ? Problem Possible Cause Smoke Enters Room During Open fire air control (pg, 1). I Start -Up Cold Air Blockage - burn a piece of newspaper to establish a draft. + If the flarne is not getting enough air, a small crack in the door is all that is needed. Kindling Does Not tit - lire Open the air control (pg. f ), Smolders Not enough starter paper - use additional newspaper if necessary. • If the flarne is not getting enough air, . a small crack in Smoke ~ Enters Room While R the door is all that is needed. w� Open the air control before opening the door (pg, 21 r. -n� Loading I • Let the air stabilize before fully opening the door. Then open the door approximately 'I inch, Let air go I into the firebox for a few seconds, Once the smoke k appears to be `lowing up the chimney consistently, open the door. * Insufficient Graft - Chimney height and outside conditions can negatively affect draft„ In these cases a ? I small amount of smoke may enter the home. Adding more pipe or a draft - inducing cap may help, Stave Does Not Burn Hot Enough 3 " Wood is Wet - see the section "Selecting Wood" on i page ' for details on wood. ? Make sure the air control is all the way open. Aide the control hack and forth to insure the control is not stuck. Insufficient Graft - Chimney height and outside conditions can negatively affect draft. In these cases the fire may burn slowly, Adding more pipe or a draft- z m �.... _ ! inducing cap may help Blower Goes Not Runt g 0 Stove is Not Up to Temperature - This is normal. The blower Wit come on when the stove is hot - usually 1 to 30 minutes. Electricity is Cut to the Blower - Check the household breaker or fuse to make sure it is operable. Stove Does Not Burn Long Depending upon wood, draft, and other factors, the Enough g I burn time maybe shorter then stated. Make sure the i doors are Sealing and not allowing air into the firebox See the Section "Door and Glass Inspection" on page 26 for details. Check the ash bed for coals, Often. . coals are still i a glowing under a slight bed of flyash, By raking these s into a can re stave pile you -start your quickly. Q Travis Industries 100-01178 40810'2 Failure to properly maintain and inspect your appliance may reduce the performance and life of the appliance, void your warranty, and create a fire hazard. Establish a routine for the fuel. wood burner and firing technique. Check daily for creosote build-Lip untr) experience shows how often you need to clean to be safe. Be aware that the hotter tile fire the less creosote is deposited, and weekly cleaning may be necessary in mild weather even though monthly cleaning may be enough in the coldest months. Contact your local municipal or provincial fire authority for information on how to handle a chimney Ire, Have a clearly understood plan to handle a chimney fire, Daily Maintenance (while stove is in use' d is "ot required once it builds tip, 1 to I" of ash may be desirable because it slows the burnrate. Generally, remove ash once it has builtup over I". Follow the directions below to remove ash Clean the Glass (if necessary) This appliance has an ahNvash to keep the glass clean. However, burning tin-seasoned wood or burning on lower burn rates leads to dirtier glass (especially on the sides). Clean the glass by following the directions below. Do not use abrasive cleaners. lk the sto`# to fWy cool, AppV qW cleaner b t _PY aeAV It the ingk$e of the glass. Wil. .4h hO.SP.P., ors Pape, tw t For 9qbbom CreoscW D-P Paper W a Pape, t t. coo Th.n sets X a OOM aWslue. JU The glass will develop a very slight haze over time. This is normal and M not affect viewing of the Ire. 0 Travis It dustries 100-01178 40810129 Monthly Maintenance (while appliance is in use) �& Make sure the appliance has fully cooled prior to conducting service. The door must form an air-tight seat to the firebox for the stove to work correctly. Inspect the door gasket to make sure it forms an air-tight seal to the firebox. AM V The door can be lifted off the hinges if extensive repairs are conducted. High-Temperature anti- sieze may be used on the door hinges to eliminate squeak's If the jass is damages it - see'Replacement I details, Use wood stove gasket cement to re-adhere loose gasket Severely frayed or thre, gasket should be relsla( The door latch should pull the door against the face • the stove (but not so tight as to not allow full handle rotation). If the latch requires adjustment, follow the directions below. Cam it woor tam Aqustment: Door Frame ((with gasket) To tighten the door cam, remove the door handle and discard orie of the washers betwen the door frame and cam, To loosen the door cam, add a washer between the door frame and cam, Yearly Maintenance \_ I Replacing the Door Handle See the illustration above for a component list (see pg, - for details on adjusting the door). Q Travis Industries 100-01178 408 102-9 IIIW KNEM� Pil Q Jill • If Do inot pry firebrick -th!ty chip and crac� easily. Remove the floor frebricks first, The side firebricks are removed later because they are pinned in place by the floor frebrick, Clean the Orebox prior to replacing the firebrick. Q Travis I nclustries 100-01178 408 10*2'9 ID # Descrip on ON Part # Air Tube with $1eeve 3 98900232 Air Tube Removal & Replacement AM 11 Allthreeairtubesareidentic Remove the left pin on the air tube collar Ua Roll Pin N ku N G Slide the air tube to the left, swing it down and remove from the firebox, Baffle Removal & Replacement 0 The baffle is held up by the front air tube. Make sure to support the baffle alter removing the air tubes, • Lift the four baffle firebricks then lift the baffle defleotor up and over its resting position, • Slide the bricks fotward and tilt thern downwards to remove. (D Travis Industries 100-01178 4 0 8 10'2`9 Air Tube Collar Years 1 & 2 - COVERAGE: PARTS & LABOR Firebox Assembly: Firebox. Baffle Supports. Alt Tubes. Air Channels. Convection Chamber Door Assembly: Cast Door, Latch Assembly, Glass Retainers # Re-Installation Allowance In cases where beater must be removed from home for repairs, a partial cost of re-Installation Is covered (pre-authorization required) One-Way Freight Allowance One-way freight allowame on pre-authorized repair done at factory Is covered, r . __ - . _"__" . ................. Exclusloris: Paint, Gasketing 7 .. .......... ------ Years 3 THROUGH 5 - COVERAGE: PARTS & LABOR One-Way FreightAllowance One-way freight allowance on pro-authorized repair done at factory is covered. Exclusibirs: Paint, Gasketing. Accessories (Legs, Pedestal. Panels, Blower), Glass, Firebrick, Re- Installation Allmance AE3= 0 Travis I ndustries 100-01178 4081019 t � CON i. EXCLUSIONS Page 2 of 2 Travis Inclustri s 100-01178 40810 3MM�M RQcPprqXKT P rk'q tuAwtal I'Arl, 1* "I"wminol to #01 MAL !**ft AXI I*Wf, X'i 00(44A '5k, (44"',5 11 RX "At *t" 4 wsw4l) Mn F. - -- � & �— 8(aMk• kviq I rk W HL M A414f, bl'114"It3a fAl by, (1,40t,l WOME I'A TPAM% 1110 NTRIE" 14 tka Ifolt o' oW4 C fmt Jr44 fiw# of �444'wts 110 KOT qgl Nwo BKA RelAxe'SIS o TRAVIS MOUSTRIVS fywikikNt,VA %275 camic +'cs' House Of FIRE I'& EfURNMR. UT4, Mil E CIP, 0 AJA W ME OF MCW: R PE 2010 Mt 2'*Q M) 104 Ud, M, All W AN, At Awt ;*q) d td lim Dft NbcleinUSA, m a m n 8 8 a a a a a a a a a a OW 0 Travis I ndustries 100-01178 40 8 10'129 Stove Leg Installation Attach each log to tie stove by hole or slot in the leg and Into the threaded hole on the stove. ^ . . . ' . These rubbet-tipped bolts are for leveling the stove, Make sure they contact the floor, Do not adjust with weight on the logs. the rubber tips may tear. Seethe bmstnuoUoms included with the pedestal. Outside Air Connector fpantminbet 99200139) See the instructions included with the kit � (D Travis IndUstries 100-01178 40810,29 Rea Slower Installation (Part # 9 900 'nie rear blower improves heat transfer by pushing heated air through the convection channel. Operating in structions are described in the section "Blower Operation", Snap Disk Assembly .-k W Bend th6 se legs on the snap disk tit aloes not fit tightly (D Attach the blower to the stove with tile three screws included with the blower. 318 " trench x. Attach the wites front tile thermodsk to tile Lim, Position the blower near the tear of the stove. Tuck all excess wire into the blower box. making sure it does not contact any moving harts. Make sure when installing the blower, these wires do not become loose. Plug the blower In, Do not route the power cord under or . location where It may become U Remove all slack from the wire and secure with the included wte clip. Snap risk Wires Wire Clip Q Travis Industries 100-01178 08102 Wedge the snap disk directly in front of the stiffener on the left side. Ali Control (Adjusting the Burn Rate( ............. ..........21 Alcove Installation Requirements..........- ....... ...,..,,...`I3 AshRemoval ..................... ......» .,.,,.,.., <..............,...21 17 Ash Removal,,..,...... 25 Blower Cleaning tif applicable)— ..... - ...... ....,..27 Blower Installation .,., ...,..34 22 Blower Operation ............................ ................ »........,...22 14 Brick Removal 8, Replacement ....... .............................29 Barn Rate ................... 19 Cathedral Ceiling with a Factory Built Chimney ... ».,...,.1 12 Chimney Connector Requrements ... .............................10 Chimney Requirements............. ... ........ I I Chimney Termination Requirements.......,. .... 2 Clearances...................... ............... ».....,.,.,.,,.. ..,..,..,,8 Corner Installation (Top Vlewi ..... ..............................9 Creosote - F'or'mation and Need for Removal ..,,,...26 7 Curing the Paint .............. ............................... ..18 Daily Maintenance )while stove is In use) ...:................25 Moor and Mass Inspection.... .........26 Door Gasket Replacement ... .,.,,. »,,......,. 6 Moor Handle Replacement .............. .............................28 Door Parts ................ .......... 8 Doors it penmq the Doors) ................ .......................19 Features & Specifications ...., .......6 Firebox Paris .....,, » .............. ...............,. ...,.,,,..29 FirstFire . ............................... ......... .......................18 Floor` Protection Requirements ...................... ..........8 # Glass Cleaning........ ... --- .... Mass Replacement ............................ .........28 Hearth (Floor Protection Requiremontsl ......................8 Hearth Stove Direct Connection.,...,... ...17 Hearth Stove Positive Connection--- ........ 16 Hints for Burning .................2 Interior or Exterior Masonry Chimney,. .... 17 Introduction & Important Information ............................2 Listing Information,...... ..... -- ..... ---- ...... Loading (Re- loading the Stove{ 22 Mobile Home Requirem ant s .. < .................. 14 Monthly Maintenance twhile appliance is in rrse) .. »......26 Opening the Doors .... ............................... 19 Outside Air Requirements ..,,.,,.... 12 Over-Firing the Stove ...... ............. .............................18 Overnight Burn .......... ............................... .. ..............22 Paint (Touch Up P intt,......,<„ ......... .............................27 Paint Smell (Curing the Paint} .................. ....... .,....18 Planning the Installation... ............ ..............................7 Preparation for Installation ..,...,... 7 SafetyLabel----- ..... ............. ................:............33 Safety Precautions ....,.,.. -4 Sounds............................ ........ ,..,,22 Specifications ..... 6 Standard Ceiling with a Factory Built Chimney ............15 Starting a Fire-- .... -- ........... --- ..,,..,,. ..,,....»...,..,2i? Stove Installation Considerations ... ..............................7 Stove Placement Requirements ................ ................8 Tap View- Corner Installation., ......9 Top View - Straight Irstallat ion ....... ..............................9 Troubleshooting--. .... ......... # Warnings {Safety Precautions) .................. ................ Warranty ......................... .....,,,...,.34 Wood ( Selecting Mood) .................. .............................23 Yearly Maintenance ,....... ..............27 Q Travis !ndLIStri s 100- 01178 4081019 TRII== R P 11 111 1111111111111111111111111111111111 � I I I I I M=ii" IZM= Date: Plan # kij P+ it Address: City, State, Zip: YlY Mechanical: City License # City License # City License # Date APPROVED , to Field Inspections zt Ridge Building Dept, Plan checker I 01 R 0 2XI0 RAFTERS 0 24* Ot. t f 8d NAILS 0 6* O.Q SPAONG AT EDGES AT INTERMEDIATE MEMBERS (FWED� I I W-0 TYP A, NEW (2) 2X8 NEW (2) V8 NOTE: ROOF SYSTEM AND ATTIC ARE NOTWENDED TO HAVE 'two ow'Ammoffam ml ROL ALL INTERIOR AND EXTERIOR WALLS TO REMAIN IN PLACE DURING REPAIR, LEGEND FLAT BOTTOM ROOF TRUSSES. NEW FOUNDATION AT REAR PATIO I 0-6' ROOF REPAIR, DIAGRAM RP-11 r- Scale: N.T.S. ME10m MEW= ra ROOF OUTLINE I 0 W U, 0 t 8 Z 5 w U 0 W R 0. :R w 0- W W LL w (0 o 0(0 2 8 • F cce( 1.0 wr • PUBLIC FIRE DE r r 1 Review Fee (due at time of submittal): .. - pill . ,. s ,x PUBLIC FIRE DE BELFOR (0) BE Work shall comply with the 1"oflowing codes: 2006 IRC, 2006 JECC& 2005 NEC µv.�,$ PROPERTYRESTORAUUM -- 50185 TCalaniatlr St, Denver, CO 803221 303-425-9700 Tax ID #84.1309171 MASSEY Main Level E Living Roorxr Height: 7' 6" pt j [ pg( 3x *9E I � !.' &Y t�Ntt..�4 .... ....,..,......_._..,.,_...e.a. .__ °__., ..., 5 80.2 8 y,�� Walls ___ °`___ w„_. �t.7.k .'^F� e�d a_.,.».«.„.,.,...... »..,..w,.,.»,- .,.,__.,.»....,., ('�'} ,y 7'^ Ceili w 1382.69 SF Walls :. Ceiling 30142 SF Floor - 33.60 SY Flooring 77.038 LF Floor Perimeter a 79.67 LF Cell, Perimeter Missing Wall - Goes to Floor 2f 7" 61 " E Opens into KITCHE ( m_ ^} fi ubroorrr Coat Closet. (1) Height: 7' 6" 75.00 SF malls 6.0301 SF Ceiling S 111.0}01 SF Walls & Ceilin 6.0101 SF Floor O) 67 SY Flooring I O,00 LF Floor Perimeter `.. 4 " 1.t) 00 LF. C.eil. Perimeter g �`�a`"` ~ ,�,g.g+=`F �„`d' �'"` �"'�w� ,,., Ss,a'ds..'.a�"��� �" ,3 ;y,..wP �� +v"5, � ^ "',a'�pTM ^ S+"'��m� •. � S` b" 8,.,w�'d "S `�" ":' � y i+u;^ k u^" �`S«:,. d DESCRIPTION _... �... QNTY Carpet 292.42 S r 1 2. Carpet pad 29142 SF 3. Vinyl the 16 00 SF 4. Underlrayrnent - 1/4" 5 ply 16.00 SF Two line r tents above for entry the at front door 5. Paint plywood sheathing 305.42 SF Above is to seal floor for sowke odor 6. Baseb oard - a 1t4" 8T08 LF 7. Paint baseboard - two coats 87,08 F_.F 8. Base shoe 87.08 T.,F 9. Seal & paint base shoe or quarter round 87,08 LF{ 10. Clean masonry 32T64 SF Above; is to Clean CMU Block wall behind drywall 11. Rigid foam insulation board - 1 ", s%e r von- A Rev : 327.64 SF 12. 1/2" drywall - hung, taped, ready for texture 96169 SF 13, Texture drywall - light hand texture 655.28 SF 14. Acoustic Ceiling (popcorn) texture 308A2 S ASST Y 314120113 Page: 2 TELFOR (0) BELFOR CONTINUED - Living Roorn DESCRIPTION 15. Seal/prime then paint the walls and ceiling (2 coats) 16, Clean floor or roof joist systems 17. Seal floor or ceiling joist system Note: engineer has specified to leave ceiling joists to keep walls tied together when the rool'structure is removed 18. Blown-in insulation - 12" depth -44-0 R-35"" 19. Rewire - average residence - copper wiring 20. Switch 21, Dinnner switch 22. Outlet 21 Phone, TV, or speaker outlet 24, Phone/low voltage outlet rough-in 25, Ceiling fan & light 26. Door chime 27. Thermostat - High grade Includes: Thermostat, thermostat cable, and installation labor, Quality: High grade with auto change over for heat/cool. 28, Light fixture 29, Attic entrance cover and trim 30. Interior door unit 3L Door knob - interior 32. Paint door slab only - 2 coats (Pat- side) 33. Paint doorAvindow trine & jamb- 2 coats (per side) Al 34, R&R Vinyl window, horizontal sliding, 33-40 sf - High grade 35. Additional charge for a retrofit window, 24-40 sf 36. Sill - cultured marble on 2" x 4" wall 3T Closet shelf and rod package 38. Seal & paint wood shelving, 12% 24" width 39. Heat/AC register - Mechanically attached 40. Window drapery - hardware - Extra large 4l. Exterior door - metal - insulated - flush or panel style 41 Door lockset & deadbolt, - exterior 41 Storm door assembly 44. Prime & paint door slab only - exterior (per side) MASSEY 3/4/2013 QNTY 963,69 SF 308,42 SF 308,42 SF 308,42 SF 308,42 SF 100 EA 1.00 EA 6.00 EA 2.00 EA 100 EA 1,00 EA 1,00 EA 100 EA Page: 3 BELFOR (0) BELFOR DESCRIPTION 45, paint door/window trim & jamb - 2 coats (per side) 46, Fireplace hearth - brick 47. Wood stove - Large size 48, Triple wall or insulated frigh temperature flue 49. Triple wall flue roof installation kit NOTES.- QNTY Gas fireplaces must comply with lFGC and manufacturer's installation specifications. 100 EA 9,00 SF 1,00 EA 9.00 LF I M EA BELFOR t0j BELFOR FROPERTYRESTORATWN 5085 Kalarnath St. Denver, CO 80221 303-425-9700 Tax ID #84-1309171 CONTINUED - Kitchen DESCRIPTION QNTY 59, Clean floor or roof joist system 126,88 SF 60, Seal floor or ceiling joist system 126 88 SF Note: engineer has specified to leave ceilingJoists to keep walls tied together when the roof structure is removed C� 6L B lown-in insulation - 12" depth - R-4+ 61 Rewire - average residence - copper wiring 61 Switch 64. Outlet 65, 220 volt outlet - Heavy duty 66. Ceiling fan & light 67. Light fixture 68. R&R Breaker panel - 125 amp w/arc fault breakers K Cabinetry - upper (wall) units - High grade 70 Cabinetry - lower (base) units - High grade Cabinets were job built - wood 71. Cabinet valance 72. Countertop - post formed plastic larninate MASSEY 3/4/2013 12&89 SF 126 88 SF 2,00 EA 6,00 EA I .00 EA 1.00 EA 1,00 EA I.00 FA 14,17 LF 7,58 LF 4,50 LF 10,58 LF 1,00 EA I e00 EA I.00 EA 1.00 EA 100 EA 14J7 LF I.00 EA 2.00 EA 1.00 EA 1,00 EA 1,00 EA I ,00 EA 1,00 EA 1, .00 EA 1,00 EA I.00 EA PROPERTYRESTORAUON 5085 Kalarnath St, Denver, CO 80221 303 - 425 -9700 'r ax III #114 - 1309171 CONTINUED - Kitchen DESCRIPTION II TIO QNTY 89. Prime & paint door slab only - exterior (per side) 111 0 EA 90. Paint door /window trine & jamb 2 coats (per- side) 2,00 L3 91. R R Vinyl window, horizontal sliding, 12-23 st -High grade lo � � K J'. ` ,00 EA 92. R : R Sill cultured marble on 2" x 4" wall 6,00 LF N OTES: 1 , 12' acs 1, Bathroom Height: ' 197.33 SF Walls 36.25 SL Ceiling at 233.58 SF Walls fir: Ceiling 36.25 SP Floor M CI 4.03 SY Flooring 24,67 L,F Floor Perimeter 24.67 L,F Ceil. Perimeter DESCRIPTION QNTY 93, R id. Tile floor covering 26.25 SF 94, R&R Mortar bed for tile, floors 2625 SF 95, Cove base: molding - nmber or vinyl, 4" high 19.67 LF 96. Clean masonry 4933 SF Above is to clean CMU Block wall behind drywall 9'7, Rigid foam insulation board - I" — " 49.33 SF 98. 1/2" drywall - hung, taped, ready for texture 23155 SF 99, 'Texture drywall - light hated texture;. 23153 SF 100. Seal/prime then paint the walls and ceiling (2 coats) 233.58 SF 101. Clean floor or root" joist systerxt :36.25 SF 102. Seal floor or ceiling joist systerra 3625 SF 103. Blown -in insulation - 12" depth - R i z 36.2.5 SF MASSEY 3/4/2013 Paage :6 PROPERMESTORAVOR --- --- -- 5085 Kalamath St. Denver, CO 80221 303-425-9700 Tax ID #84-1309171 CONTINUED - Bathroom DESCRIPTION 104, Rewire - average residence - copper witing Note: engineer has specified to leave ceiling joists to keep walls tied together when the root'structure is removed 105, Switch .... . . . ....... Shutoff val� i re on lavatories 106. Ground fault interrupter (GFI) outlet and water closets, 107, Outlet 108, Light bar - 3 lights A minimum of 2 1 of clear space is 109, Interior door unit required in front of lavatories. 11C}, Door knob - interior III. Paint door slab only - 2 coats (per side) Minimum 30" clear area for toilet is 112. Paint door/window trim &,jarub - 2 coats (per side) required with minimum 15" from 113. Clean window unit (per side) 3-- 9 SF center to sidewall on each side. 11 4, Sill - cultured marble on 2" x 4" wall ninnan 50 CFM exhaust flu'l 115. Bathtub - Detach & reset vented to exterior shall be provided Detach tub to seal behind i toilet rooms and bathrooftis, 116, Clean tub 117. R&R Tub/shower faucet II& Bathroom ventilation fan Glass less than 60" above tub floor 11(.1. R&R Ductwork - flexible - non-insulated - 3" round is required to be safety glazed. 1203, Tile tub surround - up to 60 SF 121 Medicine cabinet Walls in shower shall have non- 122, Shower curtain rod absorbent finish to 6' above floor. 123, Heat/AC register - Mechanically attached 124, Miffor - 1/4" plate glass 125. Bath accessory 126. Clean toilet 12T Toilet seat 125. Toilet - Detach & reset 129. Clean sink - pedestal 130, Detach & Reset Pedestal sink 131. Sink faucet - Bathroom 132, P-trap assembly - ABS (plastic) 133, Angle stop QNTY 1—()0 EA 1.00 EA 1,00 EA 1.00 EA I .00 EA 1.00 EA 2,00 EA 2.00 EA 1.00 EA 100 LF 1,00 EA I ,00 EA 1,00 EA I ,00 EA 6,00 LF I .00 EA 1,00 EA I .00 EA 1.00 EA 6,00 SF 3.00 EA 1.()(1 EA 1.00 EA I.00 EA 1.00 EA 1,00 EA LOO EA 1.00 EA 3,00 EA MASSEY 3/4/2013 Page: 7 7 BELFOR W BELFOR DESCRIPTION QNTY NOT --4 4 Garage Height. 8' 516,00 SF Walls 218.31 SF Ceiling 734.31 SF falls & Ceiling 21831 SF Floor 2426 SY Flooring 64.50 LF Floor perimeter 64.50 LF Ceil. Perimeter DESCRIPTION QNTY 134. Clean concrete on the floor 218.31 SF 135, Rewire - average residence - copper wiring 21831 SF 136, Fluorescent, light fixture I.00 EA 137, Switch I.00 EA B& Outlet 100 EA 139, 5/8" drywall - hung, taped, ready for texture l�x 4 7 el"" 476.31 SF 140. Seal/prirne then paint the surface area (2 coats) 47631 SF 141. Shelving - 24" - in place 61.67 LF 142, Seal & paint wood shelving, 12% 24" width 9.67 LF 143, Overhead door & hardware - 8'x 7' 1.636) EA 144, Overhead (garage) door opener 1,00 EA 145, Jamb and trim for overhead door unit 2100 LF 146. Paint overhead door - 2 coats (per side) I.00 EA 147. Paint door or window opening - 2 coats (per side) 100 EA 148. it door - metal - insulated - flush or panel style 1.00 EA 149, Door loch et & deadbolt - exterior 1.00 EA I% Prime & paint door slab only - exterior (per side) 2.00 EA MASSE Y 3/412013 Page: 8 CONTINUED - Garage DESCRIPTION 15 1. Paint door /window trim & jarra[s - 2 coati (per side) NOTES: TY 2,00 E Hall Closet Height: TV 66,5 SF Walls 4,67 SF Ceiling . r r 70.92 SF Falls & Ceiling 4.67 SF Floor 0.52 SY Flooring 8.83 LF Floor perimeter / 8,83 LF C eil. Per-itn ter ES 'I IPTIO ?TY 152. Carpet 4.67 SF 1533. Carpet pad 4,67 SF 154. Faint plywood sheathing 4.67 SF Above is to sea] floor for smoke odor 155. Baseboard - 2 1/4" 8.83 LF 1561 Paint baseboard - two carats 8.8:3 LF 157. Base shoe 8.8:3 LF 1.58. Seal & paint base shoe or quarter round 8.83 LF 159. Sea] stud wall for odor control 6615 SF 160. 1/2" drywall - hung, taped, ready for texture X92 SF 161. Texture drywall _, light hand texture X92 SF 161 Seal /prime their paint the walls and ceiling (2 coat) 70,92 SF 163. Clean floor or roof joist systerrr 4,67 SF 164. Seal floor or ceiling joist system 4,67 SF Note: engineer has specified to leave ceiling joists to keep walls tied together when the roof structure is removed MASSF Y 3/4/2()13 Page :9 BELFOR (0) BELFOR PROPERTYRESTORATON .50851 alaarrath St. Denver, CO 80221 303- 425 -9700 Tax III #134 - 13119171 311,25 SF Walls CONTINUED - Hall Closet DESCRIPTION QQTY 165. Blown-in insulation - 12" depth _ � 4.67 SF 166. Interior door unit 1,00 E 167. Door knob - interior 1.00 E 165. faint door slab only ° 2 coats (per" side) 2,00 &. 169. Paint door /window= trans & jamb - 2 coats (per side) 2.00 Est 170. Closet trackage - hall7hnen (4 shelves Y wide) 1,00 EA 371. Seal & paint wood shelving, 12 "- 24" width 10.67 L,F NOTES: Height: 7' 6" 107.43 SF Ceiling 10T43 SF Floor 41.511 L,F Floor Perimeter 14,44 SF Ceiling 14.44 SF Floor 1.6.17 LF? Floor Perimeter NTY 121.88 S1" 314!201 Page: 10 _ l' 311,25 SF Walls q4 A. 418.68 F Walls . Ceilin . 11.94 SY Floorin 41.50 LF C "eal, Perimeter _ Stabt*taom: Closet (I) 121.25 SF Walls 1 135.69 SF Walls : Ceiling 1,60 SY Floorin OEM 16.17 Lal~ C:eil. Perimeter D ESCRIPTIO N 172, Carpet MA , 'PVY Height: 7' 6" 107.43 SF Ceiling 10T43 SF Floor 41.511 L,F Floor Perimeter 14,44 SF Ceiling 14.44 SF Floor 1.6.17 LF? Floor Perimeter NTY 121.88 S1" 314!201 Page: 10 13ELFOR (0) BELFOR PROPERTYRESTORAVON 5085 Kalarnath St. Denver, CO 80221 303-425-9700 Tax ID #84-1309171 CONTINUED -Offiwt F�"OP0, MWW"M 173. Carpet pad 174. Paint plywood sheathing Above is to seal floor for smoke odor 175. Baseboard - 2 1/4" 176. Paint baseboard - two coats 177. Base shoe 178, Seal & paint base shoe or quarter round 179. Clean masonry Above is to clean CMU Block wall behind drywall 180. Seal stud wall for odor control 181. Rigid foam insulation board - I i,-f o � " 182. 1/2" drywall - bring, taped, ready for texture 15:3, Texture drywall - light hand texture, 184, Acoustic ceiling (popcorn) texture 185. Seal/prime then paint the walls and ceiling (2 coats) 186. Clean floor or roof joist systern 187. Seal floor or ceiling joist system Note: engineer has specified to leave ceiling joists to keep walls tied together when the roof structure is removed 18& Blown-in insulation - 12" depth - R10' P - PS" 189, Rewire - average residence - copper wiring 190. Switch 191. Outlet 192. Phone, TV, or speaker outlet 193, Phone/low voltage outlet rough-in 194. Ceiling fan & light 195. Bypass (sliding) door set - birch 196. Door opening (jamb & casing) - 36"to6O"wide - paint grade 197.. Paint door or window opening - 2 coats (per side) 19& Paint bypass door set- slab only - 2 coats (per side) 199. Interior door unit 200. Door knob - interior 201. Paint door slab only - 2 coats (per side) MASSEY 3/4/2013 QNTY 121.88 SF 121 .85 SF 5T67 LF 5T67 LF 57.67 LF 57,67 LF 216.25 SF 216,25 SF 216,25 SF 554,38 SF 43150 SF 121,88 SF 55438 SF l2L88SF 121,88 SF 121.88 SF 121.88 SF 1.00 EA 4.00 EA 2,00 EA 2.00 EA 1.00 EA I .00 EA 1,00 EA 100 EA 4.00 EA 1.00 EA 1,00 EA 100 EA Page: 11. PROPERTYRESTORMON 5085 1Calamaath St. Denver, CO 80221 303-425-9700 Tax ID #84-1309171 CONTINUED - Office, DESC RIPTION QNTY 202. Paint door/window trine & j<araab - 2 coats (per side) 2,00 EA 203. Clean window unit (leer side) 3 - 9 SF 2,00 FA 204, Sill - cultured marble on 2" x 4" mall 7. 0 LF 205. Closet shell' and raid package 5. 42 LF 2016. Seal & paint wood shelving, 12 "- 24" width 5.42 L 2017, Chair rail _ 2 1/2" 57,67 LF 208. Paint chair rail - two coats 5T67 LF 09 F4eattl. C" register - Mechanically attached 2,00 EA 210, Window drapery - hardware 2,00 EA NOTES: e�e� }n Bed sr5��,�ee M aste r $ +y .eight. TV T 37125 SF Walls 152.22 SF Ceiling 6 t 523.47 SF Walls & Ceiling 15122 SF Floor T T 16.91 SY Flooring 49.50 LF Ceil, Perimeter 49.50 LF Floor Perimeter 1 1 Subrcaom: Minster Bedr1 (1) Height: TV �__.�...�_.�...�._�.1235 SF Walls N�Nwry .�_ 1117 SF Ceiling 141.92 SF Walls &Ceiling 1117 SF Floor l 1.46 SY Flooring 17.17 LF Floor Perimeter 3 17.1:7 LF C.`ea1. Perimeter MASSEY 3/4/2013 Page: 12 BELFOR (0) BELFOR PROPERTYRESTORA"ON -- 5085 Kalanaath St. Denver, r, CO 02 1 303 - 425 -0700 Tax EEC 84- 1309171 DESCRIPTION O 211. Carpet 212. Carpet pad 213. Paint plywood sheathing Above is to seal floor for smoke odor 214. Baseboard - 2 1/4 " 215. Paint baseboard - two coats 216. Base shoe 217. Seat & paint lease; shoe or quarter round 218. Clean masonry Above is to clean CMU Block wall behind drywall 2M deal stud wall for odor control 220, Rigid foarn insulation board - 1 ", Al," tea 221. 1/2`° drywall - hung, taped, ready for texture 222. Texture drywall - light hand texture 221 Acoustic ceiling (popcorn) texture 224. Seal /prince then paint the walls and ceiling (2 coats) 225. Clean floor or roof joist system 226. Seal floor or ceiling joist system Note: engineer has specified to leave ceiling joists to keep walls tied together when the roof` struct re is removed 227, Blown -in insulation - 12" depth - - 228. Rewire - average residence - capper wiring 229. Switch 230. Cutlet - Amo F#v/" 2:31, Phone, TV, or speaker outlet 2'3'2. Phone /lour voltage outlet rough -in 231 Ceiling tart & light 234, Bypass (sliding) door set - birch 235. Door opening Oarnb & casing) - 36 "to6O "wide - paint grade de 236, Paint door or window opening - 2 coats (per side) 2:37. Paint bypass door set - slab only - 2 coats (per side) 2:38, Interior door unit 237. Door knob - interior 240. Paint door slab only - 2 coats (per side) 241. Paint door /window trim & jamb - 2 coats (per side) 242. Clean window unit (per side) 3 - 9 SF" 243. Sill - cultured marble on 2" x 4 °" wall 244. Closet: shelf and read package 245. Seal & paint wood shelving, 12% 24" width iMASSE Y 165.39 SF 165,39 SF 165,39 SF 66,67 LF$ 66.67 I F 66.67 L1~ 66.67 L 250.00 SF 250.00 SF 250,00 SF 665,39 SF 500.00 SE' 165.39 SF 665.33 S1^ 165,37 S1 165.39 SF" 165.30 SF 165.317 SF 1.0(7 EA 4.0(') EA 2.00 EA 2.00 EA 1.00 EA 1.00 EA I ESA 2..00 EA 4.00 EA 1.00 EA I EA 2.00 EA 2.00 EA 100 ESA TOO LE 6.58 LL 6.58 LF Page. 13 1 3 1 BELFOR (*j BELFOR PROPERTYRESTORATM14 5085 Kalarnath St, Denver, CO 80221 303-425-9700 Tax ID #84-1309171 CONTINUED - Master Bedroom DESCRIPTION QNTY 246. Heat/AC register - Mechanically attached 2.00 EA 247. Window drapery - hardware, 100 EA DESCRIPTION 248, General Demolition - per hour - remove exisung roof framing - main house and back patio 249. Truss - 4/12 slope - heavy loading 250, R&R 2" x 8" lumber (1,33 BF per LF) Above is for top plate 251. Crane and operator - 14 ton capacity - 65' extension boom 252, R&R Sheathing - plywood - 1/2" CDX 253, R&R Soffit -box framing - I' overhang 254. R&R Soffit - wood 255, Prime & paint exterior soffit - wood 256. R&R Fascia - V x 6" - #I pine 257. Prime & paint exterior fascia - wood, 4% 6" wide 258. Rafters - 2x10 - stick frame roof (using rafter length) 259, Header - double 2" x 8" 2W Header - triple 2'" x 10" Rafters shall bear fully at heel cut and shall have one H2.5 clip per rafter at bearing point. All shingles shall be nailed with rninimurn of 6 nails per shingle and mid rool'inspection required on the concrete, or metal root's. lee and water shield underlaymeg extending 2 feet inside exterior walls is required at eaves. 261.. Framing hanger 262. Remove 3 tab - 25 yr. - composition shingle roofing - incl. felt 263. Remove Add. layer of comp. shingles, remove & lisp. - 3 tab 264. 3 tab - 25 y =r. - composition shingle roofing - incl. felt 265, Remove Modified bitumen roof MASSEY 3/4/2013 QNTY 26.00 FIR 605.11() LF 13K67 LF 4.00 HR 1791 00 SF 230.00 LF 674.00 SF 674DO SF 230,00 LF 230,00 LF 264,00 LF 3&00 LF 8.00 LF 86.00 EA 1433 SQ 14,33 SQ 15.33 SQ 3,66 SQ Page: 14 ............... BELFOR 4001 BELFOR PROPERTYRESTORAUON 5085 Kalaniath St. Denver, CO 80221 303-425-9700 Tax ID #84-1309171 CONTINUED - Roof Structure DESCRIPTION QNTY 266, Modified biturnen roof 4,03 SQ 267. Drip edge 230,00 LF 2138. Step flashing 15.00 LF 213 , Flashing - pipe jack 3,00 FA 270. Gutter / downspout - aluminum - up to 5" 148.00 LF 27 Prime & paint gutter / downspout 14&00 LF 22. R&R Furnace vent - double wall, 8" 1400 LF Above is furnace venting No'rES: West Elevation Formula Elevation 50' x 8' x 0" 400,00 SF Walls 50.00 I-F Floor Perimeter 400.00 SF Long Wall 400,00 SF Short Wall 50.00 LF Ced. Perimeter DESCRIPTION QNTY 273. Trim board - I" x 8" - installed (pine) 50.001,1' 274. Seal & paint trini - two coats 5C 00 LF Above line item is for freeze board 275, 12 Exterior light fixture 3,00 EA 276. R&RMeter mast for overhead power - 2 1/2" conduit 1.00 EA 277. Detach & Reset Ornamental iron - security grill - window 30.00 SF Above line item is to gain access to replace windows 278, Clean with pressure/chemical spray 366.00 SF MASSE 3/4/2013 Page: 15 CONTINUED - West Elevation North Elevation 227.50 SF Walls 227,50 SF Long Wall - 1 4.36 1,F Ceil. Perimeter DESCRIPTION 279. Detach & Reset Ornamental iron - security grill - window 21311. 11 Slac.atlaing -• plywood - 1/2" CIS 28 1. Its Siding - beveled - pine or equal (clapboard) 282. Exterior - paint two coats 253, attic; vent - gable end - wood NOTES: , NT Formula Elevation 23' 4" x 8' x 3' 6" 23.:33 LF Floor Perimeter 227.50 S F Short Wall Q NTV 1100 Sly 93.33 Sly 93.33 SF 93.33 SF 1.00 EA ItF ASS Y 3/4/2013 age: 16 50,00 LF^ C eil. Perimeter DESCRIPTION QNTY 254. Trim board - V x 8" - installed (pine) 50.00 L 255. Seal & paint triter ., two coats 50.00 LF~ Above line item is for freeze board 286. Detach & Reset Ornamental iron - security grill. - window :31.00 S 287. Clean with pressurefchernical spray 120,00 SF NOTES: South Elevation 227.511 SF Walls 227.50 SF Long Wall 24 36 LF C:.eil. perimeter 28S. R&R Sheathing - plywood - 1.12" CDX 9333 SF _ 2159, R&R Siding - beveled - pine or equal (clapboard) 933:3 SF 2901. Exterior - paint two coats 93.33 SF~ 291, Attic vent - gable end wood 1.00 EA MAS EY 3/4/2013 Page: 17 CONTINUED - South Elevation '` General DESCRIPTION QNTY 292. Plumber - per hour 5.(1(1 FIR Above is labor to air test gas line - required by city'` 293. Temporary toilet (per rrionth) 4.00 MO 294. D1 nipstet' load - Approx, 30 yards, -7 tons of debris 3,00 E Dwri seers for roof structure - remaining debris that abatement company doesn't remove - exterior doors - windows etc - one for use during rebuild 295. final cleaning - construction _ Residential 981,78 SF 296. Clean ductwork - Interior (PER REGISTER) 9.00 EA 297. Furnace - heavy clean, replace filters and service - w1 AC 1.00 EA Furnace will need to he check as its in the crawl. space 295. Residential supervision -tier hour 16.00 HR Supervision - meeting PIE - city - owner etc during repairs 299, Taxes, insurance, permits c' tees (Bid item) - time to obtain inspections 1,00 E NOTES: M SS Y 3/4/2013 Page: 18 C 15 5 0 85 Kalarnath S t. Denver, CO 80221 3013.425 - 97001 'Fax ID #I44- 1309171 Gra n ' , otal Areas 3,971.33 SF Walls ally 941,74 ST- Ceiling 4 „95117 SF Walls and Ceilin 041.74 SF Floor 109,09 SY Flooring 50233 LF Floor Perimeter 1,255,00 SF Long Wall 1,255.00 S F Short Wall 509,55 LF C."ei1. Perurieter 941.74 Floor Area 1,1367,17 Total Area 3,71 639 Interior mall Area 1,25546 Exterior Wall area 144.43 Exterior Perimeter of Walls 0.00 Surface rat "eia 0,00 Number of Squares 0,00 Total Perimeter Length CI 00 Total Madge Length 01,00 Total Flip Length Carbon monoxide detector(s) repaired within 15 ft of all sleeping areas. Smoke Alarms shall be required an each sleeping room and outside each sleeping area per 2006 IRC, Section 3 Direct connect srmoke alarms are required. Outlets in bedrooms shall be arc- fault protected. Outlet spacing shall comply wit], � j { : 2005 N EC. J MASSE 374171113 Page. 19 0 era i :5; January 9, 2013 Observation (depart Massey 4761 parr treet Pie Consulting & Engineering Page 2 of 5 C0713005,00 (000) Observation Report Massey @ 4761 Carr Street a. In the living room, there was a hole in the roof where the fire completely RIMME ENEEMEEMM ObservaVon Report Massey @ 4761 Carr Street Pie Consulting & Engirreeting Fags 4 of 5 C0743005,00 (000) Observation Report Ma @ 4761 Carr Street Sincerely, Pie Consulting & Engineering Observed by, Nicole Ellison, P.E. Senior Forensic Engineer NE:MTB:lc Attachments: Picture Pages Fire Damage Repair Plans, Sheets C-1, DMG-1, RP-1 and DT-1, kA2013kco\co71300500ktssk 000-generai\05 reports attachments stibmittais\2013-01-02-000-mossey@4761carrstreet-rpt,docx Pie Consulting & Engineering Page 5 of 5 00713005,00 (000) East (front) elevations View of roof on saute side. Note hole in oo . M assey @ 4761 Carr Street Interior view of living room. Exterior Sri of porch roof where it meets the main roof. Massey @ 4761 Carr Street I .f} �� � \/� � . �\ / \ \ \� \\� \\ :� : m � /\ � / / \/� /�\ ;\ � \� : : . ©). \ � \./ �/ Cr 00 - W 3 i 133WIS dNV3 MOO (03wsm) - AaSSN" mmor WHOVIC 3VV)WO q4yld WvdRuioou 30NMS36 A3SSVYI m I ly T .� � i I= m m ����\ I � �,w March 11,2013 TRUSS DMGN(S) FOR THIS JOB ARE NOT CHECKED FOR UNBALANCED SNOW LOADS, I 4X6 7 i 42 )�WARXXO VoIfy tifttym pitramefena and RUPW)TV; ON IMSAW JAMOVED WrEXREFER PAGS JUL 7473 SEFORF fmm Des gn vo4d for vie onfv wRh Nalek conneclom This design is based mfy upon poi ameten shown, and a for on indf'iduof Invad4ig comconent, App ,eawuty of design patometeu and fxope' im"olpacton of com M'cent is remparabifity of koolding depignes -mt lens designer. Bmionq sfuswn e for fate of suppod of individvof web membm O p anty. Addifionat Nsmp(xay bracing fo insvie oL de ing comipixtion is the of the weClo, Addtiofial Pefft`KtoeM kX0CZQ dl the ovvotlilivnkeen 0d, mpanObRity of the buddmig designes- For gene otguid once fegaiding fab4catio"', qu'ulny C�inot' sloroge, eaection end bracf�A, corc.R ANSf/TP" Qvdfity Offeria, DSO-8? and IfCSI Sulkli.g Ciempone,fif 7777 Greenback Lane, SaAe 104 5 Ingemation CAms Heights, CA, 95610 - -------- -------- --- - 00 . " " ° - * -__. -00 11-11-0 11-1110 Scale 1,45,7 3x4 22 21 20 19 is 17 16 is 14 U4, March 11,2013 4f 6 4X6 4 00 i5 i- 7 8 9 LOADING (psf) SPACING 2-0-0 CS) TCLL 3t3.0 Plates Increase 115 i rc 0.23 TCDL 7.5 Lumber Increase 115 BC 006 SCLL 0,0 Rep Stress Incir YES W8 0,07 BCDL TS Code IRC2009fTP12007 (Matrix) LUMBER Structural wood sheathing directly applied or 6-0-0 oc purfins, ROT CHORD TOP CHORD 2s:4 SPF 165OF 1,5E recommends that Stabilizers and required cross Bracing BOT CHORD 2x4 SAP 1650F 1,5E be installed during truss erection, in accordance with Slabifizer OTHERS 2x4 WW Stud i's 16 -A6 � Design voW rof arse on8/ with Miter connecross, This design is based only vpon potametem shown, and is for can undiidvssl butichg cornpoment. Ar,p5cocHirr deNiqn pan nnetess and prapmvmvporw on of ca, ,ponent emnsombitity0 begin ng designer- not truss dehffner , &or.rnitshown rec. tor. AddiUonoritsemanew tsocitYch the cowcrl 0mcVe is the yes esmstbetyO the bufidinQ designef, Fir genisrotgwdonce nsgaiding kAxIcatron, quafity confroi, shsasge, defivery, ehsctkat or braciriq, conwfl ANVIINI Quality COleda, DS9 and OCIr Whited Compsotent ;.f.hr inform- fi*A OvWoue frorv, Inns Marr h0ifuie, 7W N. Lee Stmef, Sufte 312, Akxondna, VA 22314, 7777 Greenback Larni, Suile 1 09 Crhus Heights, CA, 4W 10 '2-0-0 11-11-0 .... ......... ... .......... M111-0 i3 -11-0 2-0-0 Stoge n 1 47 3 3X4 24 23 22 21 20 19 18 17 16 3x4 5 =- March 11,2013 DEFL in (loc) Vdefi Ltd PLATES GRIP VerbLQ -0,03 15 n/r 120 MT20 169923 Verr(TL) -003 15 n/r 120 Horz(TL) 0,00 14 old We Weight° 80 In FT = 20% BRAC3NG TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purfins, ROT CHORD Rigid ceiling directly applied or 640-0 oc bracing. recommends that Stabilizers and required cross Bracing be installed during truss erection, in accordance with Slabifizer benign tnsgoila- - -jMe— . .. ... ..... . . . ......... .. � Design voW rof arse on8/ with Miter connecross, This design is based only vpon potametem shown, and is for can undiidvssl butichg cornpoment. Ar,p5cocHirr deNiqn pan nnetess and prapmvmvporw on of ca, ,ponent emnsombitity0 begin ng designer- not truss dehffner , &or.rnitshown rec. tor. AddiUonoritsemanew tsocitYch the cowcrl 0mcVe is the yes esmstbetyO the bufidinQ designef, Fir genisrotgwdonce nsgaiding kAxIcatron, quafity confroi, shsasge, defivery, ehsctkat or braciriq, conwfl ANVIINI Quality COleda, DS9 and OCIr Whited Compsotent ;.f.hr inform- fi*A OvWoue frorv, Inns Marr h0ifuie, 7W N. Lee Stmef, Sufte 312, Akxondna, VA 22314, 7777 Greenback Larni, Suile 1 09 Crhus Heights, CA, 4W 10 '2-0-0 11-11-0 .... ......... ... .......... M111-0 i3 -11-0 2-0-0 Stoge n 1 47 3 3X4 24 23 22 21 20 19 18 17 16 3x4 5 =- March 11,2013 *1x6 ='= 4 rx { LOADING (psf) SPACING 2 -0-0 CSI DEFL in hoc) Well Ud PLATES GRIP TGLL 30.0 Plates Increase 9 15 f TO 0.36 Vert(LL) _018 8-9 >999 240 i MT20 169/123 TCDL 7.5 Lumber increase 1.95 BC, 0,49 Vert(TL) -0,34 8 -9 >834 180 BOLL 0.0 * 1 Rep Stress Iner YES WB 0.46 Horx(TL) 0,08 6 We me BCDL 7.5 i Cade IRC2009 TPI2007 (Matrix) Weight 76 in FT = 20% LUMBER BRACING TOP CHORD 2x4 SPF 165OF 1,5E TOP CHORD Structural wood sheathing directly applied or 4-1-10 oa pur9ins, BOT CHORD 2x4 SPF 165OF 9.5E BOT CHORD Rigid ceiling directly applied or 7 -11 -15 oc bracing. BS 2x4 Stud o �M.i. _.w. _.., Tek recommends ihat Stabilizers and seguired cress bracing , be installed during truss erection, in accordance with Stabilizer REACTIONS (lb/size) 2=122010-3-8 (rain. 0-1-15),6=1220/0-3-8 (rain. 0 -1.15) Max Harz 2 =103(LC 3) Max Llplitt2 = -55 (LC 5), 6=- 555(LC 6) FORCES (lb) - Max. Comp./Max. Ten. - Ali forces 250 (lb) or less except when shown. TOP CHORD 2 -3 =_2482/872, 3 -4==- 21731774, 4-5=-2173/774, 5 -6- -24821872 BOT CHORD 2-9--80312277,8- 6 -8 =- 70312277 WEBS 4-8=-2411681, 5-8=-4691324,4-9=-24I/681, 3 -9 =- 4691324 NOTES 1) Unbalanced roof live loads have been considered for this design. 2) Wind ASCE 7 -05„ 105mph: TCDI, =4,5psf; BCDL =4.5psf; h =25ft; Cat. it; Exp C; enclosed, MkAFRS (lown -rise) gable end zone, cantilever left and right exposed end vertical left and right exposed; Lumber f1OL= 1,33 plate grip DOL =1,33 3) This truss has been designed for a 1 Q.0 psf bottom chord live load nonconcurrent with any other live Goads. 4) ' This truss has been designed for a live load of 20,Opsf on the bottom chord in all areas where a rectangle 3 -6 -0 tali by -0-0 wide will fit between the bottom chard and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except Ot=lb) 2 =555, 6 =555. 6) "Semi -rigid pttchbreaks including heels" Member end fixity model was used in the analysis and design of this truss, L s � . .. .... ....... .. ............ §� ti',r� ...._,... ,.,...._. _...... , . _ .s. „ .... .. _ .,....,,... ... vas r��3. ..,... ...,.. . ., ........... �`Y 'a f� 'F ... 6_c,o 7 -1no e -u- March 11, 013 7777 G3 Oenlwck Lane, SoO 10 citrus Heigh%, CA, q5610 Swale 1:451 ,$Xd Us 3X5 :3X6 ;:,;,: DEPARTM' 'T OF PLANNING AND DEVELOPMENT Building Permit Number: 95-1049 BUILDh,,~ INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE Date: 5/23/95 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Property Owner: ATTWOOD HANNAH L Property Address: 4761 CARR ST Contractor License No. . 18266 Company: Triple 0 Plumbing Co. Phone: Phone: 457 0098 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value: Permit Fee: Description: Total: $1,500.00 $35.00 $22.50 $57.50 I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that t have read and agree to abide by all conditions printed on this application, and that I assume full responsibility for compliance with the Wheat Ridge Building Code (U.B.C.) and all other applicable W at Ridge ordinances under this perm"t. ~~ 9BI7S- Use Tax: (OWNER)(CONTRACTOR) SIGNE SPRINK. BUILDING DEPARTMENT USE ONLY Approval: - ..- 1 ].1111111111 Approval: Occupancy: Walls: Roof: Stories: Residential Units: Electrical License No : Company: Plumbing License No : Company: Mechanical License No : Company: Expiration Date: Approval: ..~_Jl_ Expiration Date: Approval: ._.~'"' Expiration Date: Approval: . (1) (2) (3) This permit was issued in accordance with the provisions set forth in yopur application and is subject to the laws of the State of Colorado and to the Zoning Regulations and Building Code of lNheat Ridj;1e, Colorado or any other applicable ordinances of the City. This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building authorized is suspended or abandoned for a period of 120 days. If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required; provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes are made or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit. No work of any manner shall be done that witl change the natural flow of water causing a drainage problem. Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card before proceediing with successive phases ofthel.ob. The issuance of a permit or the approval 0 drawings and specifications shall not be construed to be a permit for, nor an approval of, any violation of the provisions of bUiCd~ ~ othe o'dina/~:{'Ule m <egulation. ef Building Inspector THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION (4) (5) (6) 1PJ~}] DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number: BUILD'''' ~ INSPECTION DIVISION. 235-2855 CITY OF WHEAT RIDGE Date: 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Property Owner: /f/7 .vA/A Property Address: 'i? &:, ( Contractor License No. : Company :7/2 tP L t! !trwooD ("A F!./Z. Sj-- Phone: o PO) m (-] I "J <> Phone!/.s?-ou '7 J' OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value: IS DO. 0 U Permit Fee : ~ d G'e~ Use Tax: ~c9. 60 Total: ;:;, II ;)ty I hereby certify that the setback distances proposed by this permrt application are accurate. and do not vIolate applicable ordinances. rutes or regulations of the City of Wheat Ridge or covenants. easements or restnctions of record; that all measurements shown. ana allegations made are accurate: that I have read and agree to abide by all conditions pnnted on this application, and that I assume full responSibility for compliance with the Wheat Ridge Building Code (UB.C.) and all other applicable Wheat Ridge ordinances. forworl< under thls~er'.~ I~ (OWNER)(CONTRACTOR) SIGNED ~1-h ~A~DATE.#21jJ.I Description. SrP,fZ/V):: -/? 5 Y S / LJ-Y/ BUILDING DEPARTMENT USE ONLY Z.jfriifl;f"'....~.ftt:ie Approval : Zoning: Rlldlhll'~ro!!!mg Approval: PJlbIl~rIdr...'tiuJII"Qiifta~ Approval: Occupancy. Walls: Roof. Stories: Residential Units: Plumbing License No : Company. Mechanical License No : Company: Electrrcal License No . Company. Expiration Date: Approval: ..l ",P"ns~ulriida Expiration Date: Approval: !J ,P~sRlRIulrece ~1 Expiration Date: Approval : II ~ulrlRl.a (1) (2) (3) This permit was ISSUed In accordance With the prOVIsIons set forth In yopur application and IS Subject to the laws of the State of Colorado and to the Zoning Regulations ana Building Code of VVheat Ridge, Colorado or any otner applicable orClnanees of the City This permit snail expire If (A) the WOf1( authonzed IS not commencea within SIXty (60) days from Issue date or (B) the building authonzed is suspended or abandonea for a penoo of 120 days. If lhis permit eXPlres. a newpermtt may be acquired for a fee ot one-half the amount normally requtred. proVided no changes have been or will be made in the anginal plans and speedicabons and any suspension or abandonment has not exceeoed one (1) year. If changes are made or If suspensIon or abandonment exceeds one t 1) year. full fees shall be paid for a new permit. No work 01 any manner shall be done that WIll change the natural flow of water causing a dratnage problem. Contractor snail notIfy the Building Inspector twenty-four (24) hou~ In advance for all Inspections and shaH receive wntten approval on inspection caro before proceedtmg Wltn successive phases of the Job. The issuance of a permrt or the approval of draWings and speCIficatlons shall not be construed to be a permit for, nor an approval of. any VIOlation of the provisions of the bUIlding coces or any other orQmance. law. rule or regulatlOn (4) (5) (6) Chief Building Inspector For Mayor THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION