Loading...
HomeMy WebLinkAbout9734 W. 32nd Avenue7500 West 29th Avenue The Cily of Wheat Ridge, Colorado 80215 Wheat Telephone 303/ 235-2868 Ridge FAX 303/235-2857 June 19, 2001 Mr. Dennis Beamis, P.E. Ascent Engineering Services 12191 Ralston Road, Suite 200 Arvada, Colorado 80004 Re: Applewood Minor Subdivision -9th Review Commen s o rainage Study, Grading & Erosion Control Plan, Subdivision Plat & Iris Court Street Construction Plans Dear Mr. Beamis, I have completed the tenth review of the above referenced documents for the Applewood Preserve Subdivision received on June 7, 2001, and have the following comments: Subdivision Plat 1. Building envelopes need to be located with distances (and bearings where appropriate) from envelope corner(s) to Lot boundaries. 2. Some existing (easement) text may need to be moved for better readability. 3. Per Planning Commission request, please locate the storm sewer pipe on Lot 7. Any questions related to these issues can be addressed to Mr. Dave Brossman, P.L.S. at 303-235-2864. Subdivision Improvement Agreement Upon City Council approval of the Final Plat, a Subdivision Improvement Agreement will need to be executed by the project owner/developer. For the developer/owner's information and review, a sample copy of this agreement is provided. Application for Minor Dumping/Landfill Permit Prior to the commencement of any onsite grading, an Application for Dumping/Landfill Permit, along with fees due will need to be submitted for review and approval. Traffic Engineering A copy of the construction plans has been forwarded to the City's Traffic Engineer, Mr. Steve Nguyen, P.E., 303-235-2862 for review with the following comments: 1. The Public Works Department has reviewed the proposed luminaire plan. The City is requesting that an additional luminaire be placed at the intersection of W. 32"d Ave. and Iris Court. Please contact Xcel Energy with this request. Public Improvements Cost Estimate & Guarantee Prior to any construction commencing for the required public improvements within the Iris Court right-of-way, an itemized engineer's cost estimate will need to be submitted for review and approval. Upon acceptance of this estimate, a letter of credit reflecting total costs of the approved cost estimate plus 25%, will need to be submitted by the owner/developer for review and approval. Right-of-Way Construction Permit(s)/Licensing Prior to any construction of the public improvements, the necessary right-of-way construction permit(s) and respective licensing will need to be submitted for processing by the City. Please return all red-lined prints with the next submittal. If you have any questions, please contact me at 303-235-2868. Sincerely, Michael Garcia Development Review Engineer cc: Bob Goebel, Public Works Director Greg Knudson, City Engineer Steve Nguyen, Traffic Engineer Dave Brossman, City Surveyor Alan White, Director of Planning and Development Darin Morgan, Chief Building Official Meredith Reckert, Sr. Planner File (3) 9737w32nd review7.ltr