HomeMy WebLinkAbout4407 Teller StreetINSPECTION RECORD Inspection online form: http://www.cl.wheatridge.co.us/inspection Cancellations must be submitted via the online form before 8 a.m. the day of the inspection Inspections will not be performed unless this card is posted on the project site RequesA an inspection before MIDNIGHT (11:59 PM) to receive an inspection the following business day PERMIT�� ,� ADDRESS. T ,�� JAS CODE. Foundation Inspections Date Inspector Initials Comments 102 Caissons / Piers 103 Footing / P.E. Letter 104 Foundation Setback Cert. 105 Stem Walls 106 Foundation wall Insulation Do Not Pour Concrete Prior To Approval Of The Above Inspections Underground / Slab Inspections Date Inspector Initials Comments 201 Electrical / Cable/ Conduit 202 Sewer Underground Int. 203 Sewer Underground Ext. 204 Plumbing Underground Int. 205 Plumbing Underground Ext. 206 Water Underground -3/12V bL Do Not Cover Underground or Below / In -Slab Work Prior To Approval Of The Above Inspections Rough Inspection Date Inspector Initials Comments 301 Rough Framing 302 Wall Sheathing 303 Roof Sheathing 304 Sheer Inspection 305 Insulation 306 Mid -Roof -3/12V bL 307 Metal / Lath / Stucco 308 Rough Electrical Residential 309 Rough Electrical Commercial 310 Electrical Meter Residential 311 Electrical Meter Commercial 312 Temp. Const. Meter 313 Rough Plumbing Residential 314 Rough Plumbing Commercial 315 Shower Pan SEE OVER FOR ADDITIONAL INSPECTIONS PERMIT:- M12�ADDRESS:�10� SIAD,Y---S* JOB CODE: Rough Inspection (continued) Date Inspector Initials Comments 316 Rough Mechanical Residential 317 Rough Mechanical Commercial 318 Boiler / Furnace 319 Hot water tank 320 Drywall screw and Nail 321 Moisture board / shower walls 322 Rough Grading 323 Miscellaneous Final Inspections Date Inspector Initials Comments 402 Gas Meter Release 403 Final Electrical Residential 404 Final Electrical Commercial 405 Final Mechanical Residential 406 Final Mechanical Commercial 407 Final Plumbing Residential 408 Final Plumbing Commercial 409 Final Roof 410 Final Window/Door 411 Landscape/Park/Planning* Inspections from these entities shall be requested one week in advance. *For landscaping and parking inspections please call 303-235-2846 **For ROW and drainage inspections please call 303-235-2861 ***For fire inspections please contact the Fire Protection District for your project. 412 Row/Drainage/Public Works** 413 Flood plain Inspection** 414 Fire Insp. / Fire Protection*** 415 Public Works Final** 416 Storm Water Mgmt.** 417 Zoning Final Inspection* 418 Building Final Inspection Note: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not constitute authorization of occupancy. For Low Voltage permits please be sure that rough inspections are completed by the Fire District and Electrical low voltage by the Building Division. i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: t-� ' 2� e "j � Job Address: -7 Permit Number:45 O4 LJ No one available for inspection: Time S� &VIS/PM Re -Inspection required: Yes (� When corrections have been made, call for re -inspection at 303-234-5933 Date: ) q Inspect_ all - DO NOT REMOVE THIS NOTICE I* � 4 i CITY OF WHEAT RIDGE _1�9�Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 306-It11d l-oof Job Address: �qy7 Permit Number: 2010 0050`f drawtl�� ry ❑ No one available for inspection: Time �' AMP Re -Inspection required: Yes No When corrections have been made, call for re -inspection at 303-234-5933 Date: Inspector: bgre Lov(P t DO NOT REMOVE THIS NOTICE City of Wheat Ridge M. Residential Roofing PERMIT - 201800504 PERMIT NO: 201800504 ISSUED: 02/22/2018 JOB ADDRESS: 4407 Teller ST EXPIRES: 02/22/2019 JOB DESCRIPTION: Reroof with GAF Timberline HD asphalt shingles, 5/12 pitch, 26.7 squares total *** CONTACTS *** OWNER 303-341-1392 API WG, LLC SUB (303)484-9854 Dylan Lucas, Ryan Nichols 120088 Eco Roof and Solar *** PARCEL INFO ZONE CODE: SUBDIVISION CODE: *** UA / Unassigned UA / Unassigned USE: UA / Unassigned BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 9,120.00 FEES Total Valuation 0.00 Use Tax 191.52 Permit Fee 204.30 ** TOTAL ** 395.82 *** COMMENTS *** *** CONDITIONS *** Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be required for both the midroof and final inspections. The 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec. R806. The installation of ridge venting requires the installation or existence of soffit venting. For calculation purposes, one hat or turtle vent equal to one-half of one square foot of opening. Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. 1, 41 City of Wheat Ridge Residential Roofing PERMIT - 201800504 PERMIT NO: 201800504 ISSUED: 02/22/2018 JOB ADDRESS: 4407 Teller ST EXPIRES: 02/22/2019 JOB DESCRIPTION: Reroof with GAF Timberline HD asphalt shingles, 5/12 pitch, 26.7 squares total I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications; applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am leggally authorized to include all entities named within this document as parties to the work to be performed and at all work to be per rmed is disclosed in this document and/or its' accompanying approved plans and specifications. Signaturel9fOWNER or CONTRACTOR (Circle one) Date 1. Thisrmit was issued based on the information provided in the permit application and accompanying plans and specifications and is subje to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2, This ermit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original_permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4, No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any applicable code or any ordinanceegulation of this jurisdiction. Approval of work is subject to field inspection. a or A Signature of Chi a ing 0 ficial Date REQUESTS MUST BE MADE BY 11:59P ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Kimberly Cook From: no-reply@c i.wheatridge.co.us Sent: Thursday, February 22, 2018 12:16 PM To: CommDev Permits Subject: Online Form Submittal: Residential Roofing Permit Application Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in \ person at City Hall. The Building Division will be open from 7:30-10:30 a.m., J Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units 3- or 4- Units are on the property? PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number (enter WITH dashes, eg 303-123-4567) Property Owner Email Address 4407 Teller St API WG, LLC 303-341-1392 $ 3qS, K3, - - tracy@hudsongrovepm.com A Do you have a signed Yes contract to reroof this property? Applications cannot be submitted without an executed contract attached below. Attach Copy of Executed SKM C65818022121582.pdf Contract CONTRACTOR INFORMATION Contractor Business ECO Roof and Solar Name Contractor's License 120088 Number (This is a 5 or 6 digit number for the City of Wheat Ridge) Contractor Phone 303-484-9854 Number (enter WITH dashes, eg 303-123-4567) Contractor Address 610 S Lipan St (Primary address of your business) Contractor Email Address zmaiers@ecoroofandsolar.com Retype Contractor Email zmaiers@ecoroofandsolar.com Address DESCRIPTION OF WORK TOTAL SQUARES of 26.7 the entire scope of work: Project Value (contract 9120 value or cost of ALL materials and labor) Are you re-decking the No roof? Is the permit for a flat Pitched roof (2:12 pitch or greater) roof, pitched roof, or both? (check all that apply) 4 What is the specific pitch 5/12 of the PITCHED roof? How many squares are 26.7 part of the PITCHED roof? Describe the roofing GAF Timberline HD Shingles materials for the PITCHED roof. Type of material for the Asphalt PITCHED roof: Provide any additional remove existing materials to deck, install new shingles detail here on the description of work. (Is this for a house or garage? Etc) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application 3 A and to perform the work described above. I attest that everything Yes stated in this application s is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Name of Applicant Zachary Maiers Email not displaying correctly? View it in your browser. ROVE 3593 5. Tetter Street p3.431.t3gz 5uit,c 301 info@hudsongrovepm_om hudsongrovepli n.com q qG-7 -T,4, 5t Thk Agreement el Into on the _¢L day of JANUARY 20„U by and between _A ff W �' Coifs limited liabldty Paraey I, and wm LLC acting as the General Contractor (0contractor"). Whereas, the Owner has tide to land and imPffivenwnts located at UWffATDDqE CO MMI'leas the Owner desires t® hei rertaln ImPrMWMRM made to the ProPM; and Whereat, than CaMactor is in the businus of making Impirmernents to real Property, and repFMntS that it Pwftsm the requbft skiHS, expertise and eMulenm W, fteiv make drrep inner; and to the PromrtV on behalf of the Whereat-, the Ownel of said .. -ir based upon promism, coven&nts and conditions set foft In this Agreemellit; the part," agree as .:. GerMv1SCM2dftWM*- GROVE the Contractor shall be to the satisfaction of both the Owner (and Owner's Lender, if applicable), and payment shall be made only for such work and materials as are accepted by the Owner (and the Lender, if applicable): provided, how@w, that the Owner (and the Lender, 9 applicable) shall not arbltra* withhold acceptance of such wait and materials or payment so Icingas the Contractor makes satisfactory progress acid performs all of its obligations in accordance with and pursuant to all the terrns and conditions of this Agreement 4. Carr&Wprice. (a) The total contract price for all work, materials, and labor to be fumished and performed by the Contractor shall be In the fixed or 'MI price' amount of $ =34 8136 provided. (b) in the event that a change in design arwt/or deletion of materials result in a cost savings to the Contractor, then and In that event said cost savings, in its entirety, shall be passed on to the Owner as a deduction from the total price. included In the cost savings shall be any overhead or profit attributable to the change In design or deletion of materials resulting in less oWnditure of labor and/or materials on the part of the Contractor, arty subcontractor, or any material supplier. S. Medhod q f poymem. The Owner shall make the foliovving payments to the Contractor. a) $ 32553.76 Deposit b) upon substantial completion (as defined in 6a below], and acceptance of all work by the Owner, SO% of the total contract price S RAW will be peld once the following conditions are meat: 1. Contractor must also furnish to the Owner a complete release of all Pon% in form satisfactory to the Owner, from all persons, firms, and corporations who have performed work or supplied materials for or in connection with this agreement as well as an affidavit by the Contractor that the releases include all the labor and materials for which any Yen could be filed. 2. All work requiring inspection by any governmwctal authorities having juri9diMon has been duly Inspected and approvers by such authorities and by the applicable Fire Protection District, and all requisite certificates of occupancy and other governmental approvals, licenses, and permits have been duly issued. 3. If the Owner does not accept the work done by the Contractor, any reserves necessary to correct faulty work or to replace unsuitable materials will be withheld. 4. If applicable, Actual Cash Value (ACV from Statement of toss for this insurance claim must be received from the insurance company, and subsequently, released to the Owner by the Lender of the community. c) After completion and acceptance of all work by the Owner, the remainder of the contract price _$ 34.411.92 will be paid once the following conditions are met 1. Contractor must also furnish to the Owner a complete release of all liens, in form satWwwry to the Oww, from all person, firms, and corporations who have parforrnmi work or supplied materials for or in connection with this agreement as well as an affidavit by the Contractor that the releases include all the labor and materials for which any lien could be flied. 2. All work requiring inspection by any governmental authorities having jurisdiction has been duly inspected and approved by such authorities and by the applicable Fire Protection District; and all requisite certificate's of occupancy and other governmental approvals, licenses, and permits have been duly issued. :1:7.4:'sir's'!' 't:'_l:��i:i3:'•�, I GROVE 3. If the Owner does not accept the work done by the Contractor, any reserves necessary to correct faulty worst or to replace unsuitable materials will be withhel(L 4. If applicalde, Contractor must cooperate with our Insurance company and provide there with all requested items to support any additional work needed not initially approved by the insurance Company so that all Depredation funds are released as part of this Balm. S. if applicable, Depredation from the Statement of Los for this insurance claim musk be received from the insurance company and subsequently, released to the Owner by the Lender of the community. d) if applicable, Contractor.shalf cooperate with owner's insurance Company to provide, in a timely manner, any documentation as requested to support any insurance claim or related supplements. 6. T'Me jor comp/edon. Unless otherwise set forth below, the data of commencement shell be -the date of this Agreement. The Contractor shall commence performance of its obligations under this agreement MM p OF nEGE� DEPT and complete all work by no later than WITHIN 30 DAYS Qf START DATE . If i,or any reason al oorlstrtlCtltm is not wn�li�red In full upon the n of _RAYSDFROMU� then and in that event there shall be deducted from the contract price an amount equal to $200.0 per day (Liquidated Damages). For each day that construction Is not completed beyond 44 DAYS MW START VATIE _, then and in that evert, there shall be deducted from the contract price an amount egos! to $500.00 per day (Liquidated DamaW). The exception to the Imposition of such liquidated damages shall be as the result of some act of God affecting the Property and project site Itself. In the, event of such labor difficulty, above described or act of God, above deserlbed, then and in that event the completion ate shall be extended by a reasonable amount given a chh circumstances. The imposition of liquidated damages Is not the exclusive remedy available to the Owner, and Owner reserves the right to pursue additional damages and/or to terminate this Agreement on account of Contractor's breach, and or other non-performancL a. Substantial Completion is defined as acceptanoe by dty oMdals (permit $kpt-offi), comp<etfon of sowpe per manufacturers Installation recommendations with reasonable remaining punch lust items (finishes), and once an agreeable punch list has been Identftd and agreed upon by contractor and client 7. Ddault by wn&vcw. N the Contractor falls to perform the work diligently, or to make the progress . required by this Agreement, or abandons or ceases work for a period of Three or more days, not necessarily consecutive, or falls in any way to perform the conditions hereof, or falls to pay laborers, mechanics, materfalmen, and supphers when due (provided the failure to pay is not caused by the Owner's failure to make payments to the Contractor in accordance with paragraph 51, or shall become Inx4vv% pf linable to mat Its Obilgat vis as thw become dile, or fto make an assignment for the benefit of creditors, or shall commence any proceeding in bankruptcy, or it any such proceedings are commenced agakhst It (and are not discharged within teen days), the Owner may, and without prejudice to arty other rights it may have, by giving 48 hours' written rmtlee of its election to the Contactor, take over all work. or any part thereof, and all tools, equipment, and supplies and flnishh the work by whatever method It deems expedient, In such event, the Contractor shall not be entitled to receive any further payment and the work is finished, if the Owner's expense to complete exceeds the unpaid balance on this Agreement, the Contractor shall promptly pay the difference to the Owner on demand. The Owner`s expense of completion shalt be established as the actual cost of construction plus 10 percent additional for overitmad and supervision (and In the event the construction Is not completed until after _M MAYS OF STAR( RM there shall be added to such "expense of completion" the Liquidated Damage amount referred to In such paragraph 6. The Liquidated Damages provision is not the Owner's exclusive remedy as a result of Contractor's breach of this Agreement. �1j� �;. it GROVE & OWn-up. Contractor shall keep the premises free from accumulation of waste maWrW and rubbish. Before the Contractor is entitled to the payment provided for in subparagraph S{b), the improvements on the entire property, as well as all parking areas and appurtenances, shall be In "broom dean" eonditon, completely free of all trash, rubbish, debris, boxes, wraPping3, etc., and ail of the Contractor's equipment as well as any leftover materials and Inventory. In the event the Contractor does not perform this dean -up operation to the Owner's satisfaction, the Owner may, after 48 hours' written notice to the Contractor, perform the dean -up operations with owner's own contractor or agents, charging the Contractor with the cost thereof, plus 10 percent, and deducting the some from the payments provided for in paragraph S. 9. Permits mord licenses. The Contractor shall at its own cost and expense apply for and obtain all necessary building, occupancy, and other governmental permits and licenses required in connection with the construction and for the use and occupancy of the improvements with the appurtenances, The price for the saline is part of the "total price Identified above, and shall not be in addition to the total price. The Contractor shag at all times strictly comply with and conform to all riles and regulations of the applicable fire Department or Fire Protection District, any outer special districts, and to all laws, ordinances, and regulations (Including but without limitation all applicable building codes and requirements) of ail governmental authorities relating to the manner of doing the work to be performed under this agreement. 1D. Temporaty cons. The Contractor shall provide and furnish at its own -cost all necessary sanitary ffedtities during the period of work on this scope. 11. Indernalty. The Contractor shall indemnify the Owner and hold It harmless against all liabilities, claims, and demands for personal Injury or Property damage arising out of or caused by any act or omission of contractor, its subcontractors, agents, or employees, or arising In or about the Property at any time from the date of" agreement until final completion of the scope The Contractor shall use proper care In the performance of Its work so as not to cause damage to any adjacent property, or injury to a third party, and the Contractor shall indemnify and hold the Owner harmless from any liabilities, dalms, or demands for damage to such adjoining or adjacent property, or injury to a third party. 12. /Awrareee. The Contractor shall at all times, commencing with the date upon which this Contract begins, carry the f0lidwing types of insurance with an insurance carrier or carriers acceptable to the Owner and the lender and In policies approved by tate Owner and the lender (a) Workers' compensation Insurance fully covering all persons engaged in the performance of this agreement in accordance with Colorado law. (b) Public liability insurance covering death or bodily injury with limits of not less than $IX%000 fOr one PMM 21111 S2=0W for any one accident or disaster and property damage coverage with limits of not less than $Z000AM which insurance shah name the Owner as an additional insured. W "Builder's rlsk" Insurarroe against damap or destrt cUoon by fire and fill extended coverage Including vandalism and malicious mischief, covering all improvements to be erected and all matertais thr the some which are on or about the property, in an amount equal to the full insurable value of the Improvements and materials, such Insurance to be made payable to the Owner and the Contractor, as their interests may appear, with standard mortgagee endorsement in favor of the lender, If applicable. Contractor shall also have in effect, "completed operations" or similar coverage, in a form acceptable to Owner, which shall afford coverage not on a dims -made basis, but on an event -of -construction basis. =:oras*.- ..... _a21V 51* GROVE 13. Uens. The Contractor shall Indemn7y and hold the Owner harmless from all Hens, or claims of res to enforce liens, against the Property or the Improvements arising out of any work to be perfrmned or labor or materials to be furnished under this agreement. Neither final payment by the Owner nor acceptance of the Improvements shall constitute a wahrer of this indemnity, and d arty lien or claim for pen shall at any time be filed the Contractor shall refund to the Owner all moneys the Owner may be compelled to pay in discharg" the lien Including ab costs and a reasonable attorney's flee. 14. Assignment. The ContracWr shall not assign this agreement or any amount payable hereunder without the prior written consent of the Owner. The Convector shall, upon request of the owner, disclose to the Owner the names of all subcontractors or other persons with whorn It contracts or Intends to contract with or hereafter contracts with in connection with the performance of this agreement, 15. Correction of defoults. AN Contractor's work shall be completed in a good workmanlike manner. The Contractor will, for a period not to be less than one (1) year after completion of the build, at the request of the Owner correct arty defaults due to faulty materials or wortananshiA without cost to the Owner, ,and neither the final payment by the Owner nor the final acceptance by the Owner of the Improvements shall relieve the C:ontractw from responsibility for any defect In materials or worbrranship. Any warranties offer by Contractor, suppliers, or other vendors will not be diminished by this section. 16. Pn*ctian. During the conduct of Contractor's worst, Contractor shall protect the building preeirses, aclacent property and the public from damage, and be responsible for any damage or injury due to Contractors acdons or neglect. 17. Dhpute RerWu(fan. In the event of a dispute over the enforcement or interpretation of this contract, which results In arbitration or litigation over the tem and conditions of this contract, orthe rights, duties and obligations of the respectim parties under this contract, the prevailing party shall be awarded tft reasonable costs and attorney fees related to resolving any such arbitration or litaigation 18. Banos. No claim for payment (in excess of the amount set firth In paragraph 4) for extra labor or materials of any Mnd shall be made by the Contractor or shall be payable by the Owner unless the some is performed or furnished pursuant to a written agreement executed by both the Owner and the Contractor. 19. Unempfeyment inmmnoe and tronm. The Contractor shall pay, at tate Contractor's own cost, all taxes and imposidons in connection with the work or materials to be performed or furnished, includhtg, but not limited tic, state and federal unemployment and old age beneftt goes, inoame tax; sales taxes, use taxes, and adse tames. 20. Modem. All notices to the parties shall be in writing and shall be sent by registered or certified mail to the addressees and address specified below. mnadml0ftQwwswOtt w*u9 . GROVE Hum= so - a, Pmww Aftn"Nown I fig is of *&ConbacW bomumW*mn onto dual pwm*ww"cmp"m*t*&WwL M wftmwlmn&oe pmjwhaws cmmdtit mWevromto Wmm"d %*W&tmmwft M -,k**&vbw&v*"4wftWL AGW FM OWUM hu C-emwg Paler e CA #tw 0 C 4 -X 5A-vo- COMMUNITY DEVELOPMENT DEPARTMENT BUILDING INSPECTION LINE - (305-234-5933) CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80033 - (303-235-2855) Building Permit Number Date 17262 6/23/2004 Property Owner: fuller management Property Address : 4407 teller st. Contractor License No. : 19621 Company : Kilpatrick Plumbing & Heating Phone: 303-312-4240 Phone: 2340835 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby cedify that the setback distances proposed by lhis permit application are acwrate, and do not violate applicable ordinances, rules or regulations of the Ciry of W heat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application, and that I assume full responsibility for compliance with the Wheat Ridge Building Code (U.B.C.) and all other applicable W heat RiAe ofdinances, for work under this permit. (OWNER)(CONTRACTOR)SIGNE ~ + - DATEJ~,4-Df/ Description : replace hotwater heater Construction Value Permit Fee Use Tax Total Use: BUILDING DEPARTMENT USE ONLY Zoning Comments;; Approval: Zoning : Btilidfng Cominants:; Approval: Publtc WorksComments:. Approval: Occupancy: Walls Roof Electrical License No : Company: Expiration Date : Approval: Plumbing License No : Company: Expiration Date : Approval: SIC l, . $800.00 $42.46 L -O 1065q Sq. Ft. : Stories : Residential Units : Mechanical License No : Company: Expiration Date : Approval : (1) This parmit was issued in accordance with the provisions sel foAh in yopur application and is subject to the laws of the Stale of Colorado and to the Zoning Regulations and Building Coda of Wheat Ridge, Coloredo or any other applicable ordinances of the City. (2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building authorized is suspended or abandoned for a periotl of 120 days. (3) If ihis permil ex0ires, a new permit may be acquiretl for a(ee of one-half the amounl normally required, provided no changes have been or wiil be made in the original plans and specifcations and any suspension or abandonment has not exceeded one (1) year. If changes are made or if suspension or abandonmem exceetls one (1) year, full fees shall be paid for a new pertnit. (4) No work of any manner shall be done thal will change the naturel Flow of waler causing a drdinage problem. (5) Coniractor shall notify the Building Inspector hventy-four (24) hours in advance for all inspections and shall receive writlen approval on inspection card before proceediing with successive phases of the job. (8) Phe issuance o( a perm' r pproval o( ' and speci(cations shall not be construed to be a permit for, nor an approval of, any violation of the rovisions o! the es or an rtlinance, taw, rule or re9ulalion. Chief Buil5wnspeefor Please sign Terms and Conditions on reverse side of page i~ DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number: BUILDING INSPECTION LINE - 303-234-5933 Date: CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE R'HEAT RIDGE, CO 50215 - (303-235-2855) "PUCAT1ON '~r~X -KPrh~ C ~(d95-t Property Owner: r V l-~ECL- CnKlt~`~ ~VE4Y~ tv \ PropertyAddress: 4~AC:54 I F~ULE'Q-ST Phone:~z->~ Contractor License No.: t() Zl Company: Phone:~..13-23y-~~35 O WNER/CONTRACTOR SIGNATURE OF TINDERSTANDING AND AGREEMENT I heazby cerUfy that the se[back distances ptoposed by this peimit applicafion aze accurate, and do not violate applicable ordinances, rules or regulations of the CiTy of Wheat Ridge or covenanis, ensemerts or reshictions of record; lhat all measuremenfs shown, and allegations made aze accivate; that I have read and agree to abide by atl conditions printed on this applicalions and that I assume tull responsibiliTy for compliance with ihe Wheat Ridge Building Code (U.B.C) and all other applicable Wheat Ridge Ordinances, for work under lltis pemut. Construcrion Value: Permit Fee: Plan Review Fee: TicP Tax TOt31: (OWNBRxCON1RACTOR):SIGNE DATH~~Q~ L Description: ~8a~ .o c7 "as~ti~#itS: Apprwal: Zoning: .'f131iMtt6nGS: Approval: Z#U~S'~`AIC~1t~1EkIt;S Approval: Occupancy: Electrical License No: Company: Walls: BUILDING DEPARTMENT USE ONLY SIC: Sq.Ft.: Roof. Stories: Residential Units: Plumbing License No: Mechanical License No: Company: Company: Expiration Date: Espiration Date: E7cpirafion Date: Approval: Apprwal: Apprwal: (1) This pumit was issued m accordance with the prwisions set foRh in your applica4on and is su6ject to the laurs of Ne SGte of Colorndo and ro the Zoving Regula4ons anA Huilding Code af Wheat RiAge, Colorado or any othrs applicable o[dinanecs of Ne City . (2) This pe.it shall wpue if (A) the work autlwnzed is not commenaA within sixty (60) days from issue Mro or (B) the buildmg authonzed is suspended or abandoneA fo[ a period of 720 days. (3) H[his pemut exprtes, a new pemu[ may 6e uquired for a fee of ono-haff the amoont nonnalty mquimd, prwideA no changes hzve 6een or wiR 6e maAe in the onginal plans and specificatioas and azry susyension oc abandovment has not azceeded ove (1) year. If changes have been or if suspeavon or abandonment ezceecls one (1) yeaz, fiill fees shall be paid for a new pevnit. (4) No work of any uunner slull be done that will change lhe neNrel flow of wat¢ causing a drainage pmblent. (5) Conhactor shall notify the Building In.vpecmr twenty-foar (24) houcs m advanre fw all ivspections and shall receive urzitten appmval on mpw4on card beforo pmceedingvnthsuccessivephazes ofthejob. (6) The issuance oF a pemut or the approval of drawivgs anA specifiw4ore shall not be ronsWeA to be a pemtit for, nor an approval of, anyviolation of Ne provisions ofthe b#Aivg roAes or arry oJh*ordinawcq law, rule or regulation. Chief $uiYding Inspector '