June 30, 1995
Mr. Lawrence De2man, P.E.
Futura Engineering, Inc.
12741 East Caley Avenue, Suite 126
Englewood, Colorado 80111
~'l v
Re: Batug Subdivision (Quail Cove) - Approval of Construction
Plan
Dear Mr. Wyatt,
This letter is to inform you that the construction plan for the
above referenced project has been reviewed and approved for
construction. The drainage study/erosion control plan has been
previously approved as a result of the Class II Special Exception
permit for this site. Please be aware of the following items
regarding the construction of the project:
1. The proposed drainage facilities shall be constructed and
approved by the City of Wheat Ridge prior to issuance of the
Temporary Certificate of Occupancy.
2. Erosion control for the project shall be placed in conformance
with the approved drainaqe/erosion control plan and shall be
maintained as needed during the course of construction.
3. All drainaqe improvements shall be constructed in conformance
with the approved drainage report and plan.
4. It will be the responsibility of the contractor for the
project to repair any damage to the existing public
improvements on Quail Street and/or West 38th Avenue as a
result of related construction traffic in the area. Also, the
contractor will be responsible for maintaining Quail Street
and West 38th Avenue on a regular basis such that it is free
of construction debris and tracking from construction traffic
accessing the site.
5. Upon completion of the drainage improvements, the engineer
shall provide to the City of Wheat Ridge a letter of
certification stating that the various improvements, as
defined in the drainaqe report and plan, have been accurately
surveyed to confirm that their construction is in accordance
with these documents. The certification letter shall be
c,
June 30, 1995
Mr. Lawrence Dezman, P.E.
Futura Eng., Inc.
Page 2
written and stamped by the engineer who prepared the drainage
report, and shall be submitted for review and approval by the
City prior to issuance of the Certificate of Occupancy.
6. All contractor licensing and permit requirements to work in
the public right-of-way shall be completed by the contractor
for approval by the City of Wheat Ridge at least 24 hours
prior to commencing work.
If you have any questions, please contact me at 235-2868.
Sin er ,
Development Review Engineer