Loading...
HomeMy WebLinkAbout8505 W. 38th AvenueCITY OF WHEAT RIDGE' ��(30Building Inspection Division (303) 234-5933 Inspection line 235-2855 Office • 303 237- f/ 3) ( ) 8929 Fax INSPECTION NOTICE Inspection Type: .76V A�0 Job Address: Permit Number: ❑ No one available for inspection: Time �1 - A,I I`/PM Re -Inspection require: Ybs 4w When corrections have been made, call for re -inspection at 303-234-5933 Date: f /Inspector: { C DO NOT REMOVE THIS NOTICE 2017032 -2E - o INSPECTION RECORD Occupancy/Type INSPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/inspection INSPECTION REQUEST LINE: (303) 234-5933 Inspections will not be performed unless this card is posted on the project site. **Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Comments Initials Pier Concrete Encased Ground (CEG) Foundation / P.E. Letter Do Not Pour Concrete Prior To Approval UT I ne ADove Inspections Underground/Slab Inspections Date Inspector Comments Initials Electrical Sewer Service Plumbing / nn Ain+ rr%var I Indarnrniinrl nr RPlow/In-Slab Work Prior To Anaroval Of The Above Inspections Rough Inspections _ Date Inspector Initials Comments Wall Sheathing Mid -Roof / Lath / Wall Tie Rough Electric Rough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw/ Nail Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing Final Mechanical Roof Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. *For low voltage permits — Please be sure that rough inspections are completed from the Fire District and electrical low voltage by the Building Division. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather n 1'DDS3 W'S�+��INSOAEJCTION,-�)RCORD yoccupancy/Te SPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/inspection INSPECTION REQUEST LINE: (303) 234-5933 ancellations must be submitted via the online form before 8 a.m. the day of the inspection Inspections will not be performed unless this card is posted on the project site. **Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Comments Initials Pier Concrete Encased Ground (CEG) Foundation / P.E. Letter Do Not Pour Concrete Prior To Aooroval Of The Above Insnections Underground/Slab Inspections Date Inspector Initials Comments Electrical Comments Sewer Service Plumbing Do Not Cover Underground or Below/In-Slab Work Prior To Approval Of The Above Inspections Rough Inspections Date Inspector Initials Comments Wall Sheathing Mid -Roof Lath / Wall Tie Qough Electric Rough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw/ Nail Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing Final Mechanical Roof Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. -For iow voltage permits — Nlease be sure that rough inspections are completed from the Fire District and electrical low voltage by the Building Division. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather City of Wheat Ridge Residential Mechanic PERMIT - 201702596 PERMIT NO: 201702596 ISSUED: 06/27/2017 JOB ADDRESS: 8505 W 38th AVE EXPIRES: 06/27/2018 JOB DESCRIPTION: Residential HVAC: Install 4 ton A/C unit 16 seer and 48K BTU FAU. Remove and replace in same location *** CONTACTS *** OWNER (303)467-0509 HUGHES DANIEL SUB (720)746-1661 Don Bowman 017696 Cory Heating & A/C *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 7,000.00 FEES A/C Replacement 60.00 Furnace Replacement 40.00 Total Valuation 0.00 Use Tax 147.00 ** TOTAL ** 247.00 *** COMMENTS *** *** CONDITIONS *** Work shall comply with 2012 IRC & 2014 NEC. Per IRC Sec. R314, smoke detectors are required to be installed in every sleeping room, in hallways outside of sleeping rooms, and on every level of the structure. 1, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the Iegal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include alt entities named within this document as parties to the work to be performed and that all work to be performed ,s disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanying )Tans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building - Official and maybe subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection_ Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provis of any applicable code or any ordinance or regulation of this jurisdiction. Approval o is subject to field`inspection.. X .l Signature of Chief Building Official Date %j REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line. wvCitof 500 Ing 4 i p� W 29th Ave pe�tion ery Insp��'ti303-2 S 28SS hea R arceS D,t�isio Email. e rnitsLine .03-2,3 ax_ 303-23 _ 8p033 Cf. weatnd e3Cn US 8829 RESIDENTIAL --VICE UPGRADE ®g OFFICE SSE O NL y pla�E'nfi;t# . 1'l +.4 piease cel pro i�ty,�ddr�SAlefe all h;9htig��eas g Pe ar rM t pro Ae' _ on beth sees of this p�,%��t%® pro �"y Owner `SSE 1.i_ f �►n /ocoftlete epi Aer4r owner F� Arirl�_ 0 1 cau'ns MO.Y not be r 'wailing Addr iai�%er� ss nt tha17 props oY ad es Sfafe. Zin. p'r s) Archit, ,qjneer Conte.Otorseitj� Gig" '°pact,,. - cense#: Esub ccn�actors: ectj,--,/. w R• City License* her C V License sea Sub' Phone. one. PluMbing_ vv. R. City License # ph' ° 0:3 Mechanical. -t%i^ ll Other W.R. City License # �ti Ci Y Ci C°�pl�te all • City Ci�nse # nsea Sub. l�fo�ation on $ OT$ Sides °f this f0� �s -7,3-� jilding piVlsion Valuation: $---- i CITY OF WHEAT RIDGE _1�9rBuilding Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 301 R F L Job Address: 96fL '30f"' '41(? Permit Number: _201705-337 ❑ No one available for inspectio : Time AM/PM Re -Inspection required: YesNo When corrections have been, made, ca or re -inspection at 303 -234 - Date: JO) 7 Inspector: m T DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 3 R f Job Address: r Permit Number: ( % �0 5 13 <7 00, BIOS fp A ❑ No one available for inspection: Time AM/PM Re -Inspection required: 9 No When corrections have been made, call for re -inspection at 303-234-5933 Date: / 7 Inspector: DO NOT REMOVE THIS NOTICE P A i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type:, v Job Address: ' '~ 7 tj i t Permit Number: _2G l 3 ❑ No one available for inspection: Time .-' _ j�mwpM Re -Inspection required: Yes (-No When correctio have been made, call for re -inspection at 303-234-5933 Date: 7 :f Inspector: a ,l DO NOT REMOVE THIS NOTICE A i CITY OF WHEAT RIDGE -� - Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: _-- �`�t Job Address: G �%T' ��) l r /Iyc Permit Number: IL ❑ No one available for inspection: Time '' " AM/PM Re -Inspection required: Yep o When corrections have been made, call for re -inspection at 303-234-5933 Date: ''/'� !' Inspector: / r f DO NOT REMOVE THIS NOTICE City of Wheat Ridge Residential Solar PERMIT - 201705339 PERMIT NO: 201705339 ISSUED: 08/21/2017 JOB ADDRESS: 8505 W 38th AVE EXPIRES: 08/21/2018 JOB DESCRIPTION: Rooftop solar pv install 6.6 kw *** CONTACTS *** OWNER (303)979-5737 HUGHES DANIEL SUB (720)746-1661 Jerry Hughes 090190 Stellar Energy Contractors SUB (720)435-3031 Slawomir Golabev 080111 SG Electric *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA Unassigned SUBDIVISION CODE: 2406 BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 FEE SUMMARY ESTIMATED PROJECT VALUATION: 16,734.25 FEES Total Valuation 0.00 Residential Solar 500.00 TOTAL 500.00 COMMENTS CONDITIONS Approved per plans and red -line notes on plans. must comply with 2012 IRC, 2014 NEC and all applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections. 1, b tu do hereby attest that the work to be performed shall comply withal] accompanyin r approved plans and specifications, m I rej codes, and all applicable municipal codes, policies and procedures, and tha t%e legal owner or have been authorized '�ic app 1e'Caildin by the legal owner of the property and am authorized to obtain this permit and erform the work described and approved In conjunction with thisyermit. I further attest that I am legally authorized to include all entities na ed within this document as parties to the work to be pertormed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. 7;� D72?41� Siina/ture of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing, and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If thi.s permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subjeq to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspeytions and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The !issuance or granfgi�Vf a permit shall pot be co- strued to be a permit for, or an approval of, any violation of any provision of any applicable code or an ce r �reg n Thi jurisdiction. Approval of work is subject to field inspection. MMW- wuq Signature of Chief Building Official Date REQUESTS 14UST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. - 10 r City of r40000rWheatR,.d c(.1kA1 , j ge COMMUNITY DEVELOPMENT Building & Inspection Services Division 7500 W. 291h Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: Perm its(c)ci.wheatridge.co. us I FOR OFFICE USE ONLY I Date: �y �3 Plan/Pennit #ao V00533 Plan Review Fee: $ 5vo 06 Building Permit Application *** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: R750�s � 1) A& � Owner Property Owner Email: �'e' 6� L-Q�) -� L�m Mailing Address: (if different than property address) Address: City, State, Zip: Architect/Engineer-, Arch itect/Engi neer E-mail: Contractor: Phone: Phone: Contractors City License #: - C\n q6 Phone: --Im --Vu - � I (I () � Contractor E-mail Address: I Sub Contractors: E��&�L, Electrical: Plumbing: Mechanical: W.R. City License # W.R. City License # W.R. City License # Other City Licensed Sub: Other City Licensed Sub: City License # City License # Complete all information on BOTH sides of this form COMMERCIAL RESIDENTIAL Description of work: (Check all that apply) [I NEW COMMERCIAL STRUCTURE El ELECTRICAL SERVICE UPGRADE El NEW RESIDENTIAL STRUCTURE El COMMERCIAL ROOFING n COMMERCIAL ADDITION El RESIDENTIAL ROOFING F] RESDENTIAL ADDITION F1 WINDOW REPLACEMENT F1 COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) F] RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) F1 MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT F1 PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT F1 ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPI-6CEMENT ROTHER (Describe) j�LN�-� (For ALL projects, please provide 6 il-etailled descripfi6iri of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc.) Sq. Ft./LF Amps Btu's Squares Gallons Other Project Value: (Contract value or the cost of all materials and labor included in the entire project) OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. 1, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLEOAE: (OWNER) (CONTRACTOR) or�UTHORIZEDREPRESENTAT[ of (OWNER) (CONTRACTOR) Electronic Signature (first and last name): DATE: DEPARTMENT USE ONLY ZONING COMMENTS: OCCUPANCY CLASSIFICATION: Reviewer. BUILDING D ZMENTS: Reviewer: Building Division Valuation: $ E T E n G i n E E R S VSE Project Number: U1878-1147-171 August 18, 2017 DBM Design and Consulting Company, LLC ATTENTION: Chase Daily 707 24th Street, Suite B North Ogden, UT 84401 REFERENCE: Daniel Hughes Residence: 8505 West 38th Avenue, Wheat Ridge, CO 80033 Solar Array Installation To Whom It May Concern: We have reviewed the documents and photographs provided by STELLAR Energy Contractors relating to the installation of the solar array at the above -referenced site. Based upon our review, it is our conclusion that the installation of the solar array on this existing roof will not adversely affect this structure. It is our understanding that the structural components of the existing roof framing are in good condition and free of damage. The design of the solar panel racking (mounts, rails, etc.) is by the manufacturer or contractor. Design Parameters Code: International Building Code, 2012 Edition Risk Category: II Design wind speed: 135 mph (3 -sec gust) per ASCE 7-10 Wind exposure category: C Ground snow load: 30 psf Design snow load on roof: 30 psf Existing Roof Structure Roof structure: 2x4 manufactured trusses @ 24" O.C. Roofing material: composite shingles City of -rj��OrWheat-_P%'d LormEN k Conclusions __.,—commvNrrY Dm T _ge APPROVED Our conclusion regarding the adequacy of the existing roof is based ou the f ct th na weig o f, the add't' I ht f the solar array is A"Mad lor - C _pm e 3 psf or less. In the area of the solar array, other live loads bc; U IN y reduced. The member forces in the area of the solar panels are not increased by more than 5%; thus, the stresses of the structural elements are not increased by more than 5%. Therefore, the requirements of ctio 340 .3 of the 2012 IBC are met and the structure is permitted to remain unaltered. .am. Mans E aminer Date V.Jw�y Lper 11"", ni! The issuwxtofopemitofopprowOfpioftsw6f and oo,nputolios shall not be a pe—if 10f, Of On WFOwl Of 4"Y"i"tatiOnto any of the provisions of th, building code or of any City ordinances. PennitS presu-bv to give authority to violate of cancel the provisiom of the Dulbft ,ade, V othef ordinances of the City shall W be Valid. 651 W. Galena Park Blvd., Ste. 101 Draper, UT 84020 / T (801) 990-1775 / F (801) 990-1776 / www.vectorse.com VSE Project Number: U 1878-1147-171 Daniel Hughes Residence T8/18/2017 E Y n r= i n F= E R 3 The solar array will be flush -mounted (no more than 6" above the roof surface) and parallel to the roof surface. Thus, we conclude that any additional wind loading on the structure related to the addition of the proposed solar array is negligible. The attached calculations verify the capacity of the connections of the solar array to the existing roof against wind (uplift), the governing load case. The connections to the existing roof shall be spaced at 48" maximum. Regarding seismic loads, we conclude that any additional forces will be small. With an assumed roof dead load of 10 psf, solar array dead load of 3 psf, and affected roof area of 33% (maximum), the additional dead load (and consequential seismic load) will be 9.4% Xhis calculation conservatively neglects wall weight. Because lateral loads are increasing by less than 10%, the installation of the solar panels meets the requirements in Section 3403.4 of the 2012 IBC and the structure is permitted to remain unaltered. Limitations Installation of the solar panels must be performed in accordance with manufacturer recommendations. All work performed must be in accordance with accepted industry -wide methods and applicable safety standards. The contractor shall notify Vector Structural Engineering, LLC should any damage, deterioration or discrepancies between the as -built condition of the structure and the condition described in this letter be found. Particular attention must be paid to the maximum allowable spacing of connections and the location of solar panels relative to roof edges. Connections to existing roof framing must be staggered so as not to overload any existing structural member, except at array ends. The use of solar panel support span tables provided by others is allowed only where the building type, site conditions, site-specific design parameters, and solar panel configuration match the description of the span tables. Electrical engineering is the responsibility of others. Waterproofing around the roof penetrations is the responsibility of others. Vector Structural Engineering assumes no responsibility for improper installation of the solar array. VECTOR STRUCTURAL ENGINEERING, LLC Clifton Palmer, P.E. CO License: 0051669 - Expires: 10/31/2017 Project Engineer Enclosures CMP/rsl city of VVheat Ridg, 651 W. Galena Park Blvd., Ste. 101 / Draper, UT 84020 11 T (801) 990-1775 1/ F (801) 990-1776 / \*Wrdqf,;(Khj�.qo 17 T n s i n E E R S PROJECT: Daniel Hughes Residence JOB NO.: U1878-1147-171 SUBJECT: WIND PRESSURE 1components and Cladding Wind Calcui�i� Label: ISolar Panel Array I Note: Calculations per ASCE 7-10 SITE-SPECIFIC WIND PARAMETERS: Basic Wind Speed [mph]: 135 Notes: Exposure Category: C Risk Category: 11 ADDITIONAL INPUT & CALCULATIONS: Height of Roof, h [ft]: 25 (Approximate) Comp/Cladding Location: Gable Roofs 27* < 0:5 45* Enclosure Classification: Enclosed Buildings Zone 1 GCP: 1.0 Figure 30.4-2C (enter largest abs. value) Zone 2 GCP: 1.2 (enter largest abs. value) Zone 3 GCP: 1.2 (enter largest abs. value) a: 9.5 Table 26.9-1 zg M: 900 Table 26.9-1 Kh: 0.95 Table 30.3-1 K�t: 1 Equation 26.8-1 Kd: 0.85 Table 26.6-1 Velocity Pressure, qh [Psfl: 37.5 Equation 30.3-1 GCpi: 0 Table 26.11-1 (largest abs. value) OUTPUT: I p=qh[(GCj—(GCj1j Equation30.9-1 Zone 1 Pressure, p [psfl: 37.5 psf (1.0 W, Interior Zones*) Zone 2 Pressure, p [psfl: 45.0 psf (1.0 W, End Zones*) Zone 3 Pressure, p [psq: 45.0 psf (1.0 W, Corner Zones* within a) (a= 3 ft) I cityof , Wheat Ridge T n s i n E E R S PROJECT: Daniel Hughes Residence .ag Screw Connection Capacity: Max Lag Screw Size [in]: 5/16 Cd: 1.6 NDS Table 2.3.2 Embedment [in]: 2.5 (psf) Grade: SPF (G = 0.42) Capacity [lbs/in]: 205 NDS Table 12.2A Number of Screws: 1 Prying Coefficient: 1.4 4.0 Total Capacity [lbs]: 586 2 JOB NO.: U1878-1147-171 SUBJECT: CONNECTION Demand: Dernand< Capacity: CONNECTION OKAY I City of , VV'eat Ridge Pressure Max Max. Trib. (0.6 Wind) Tributary Area Max. Uplift (psf) Width (ft) (ft) Force (Ibs) Zone 1 22.5 4.0 11.0 247 2 27.0 4.0 11.0 297 3 27.0 3.0 8.3 223 Dernand< Capacity: CONNECTION OKAY I City of , VV'eat Ridge T R n rm I n I=- E=- R S PROJECT: Daniel Hughes Residence CALCULATE ESTIMATED GRAVITY LOADS ROOF DEAD LOAD I Roof Pitch/12 7.2 Composite Shingles 2.3 1/2" Plywood 1.2 Framing 3.0 Insulation 0.5 1/2" Gypsum CIg. 2.0 M, E & Misc 1.5 DIL 10 PV Array DL 3 ROOF LIVE LOAD (Lr Existing Design Roof Live Load [psfl Roof Live Load With PV Array [psfl SNOW LOAD (S): Roof Slope [x:121: Roof Slope [']: Snow Ground Load, pg [psfl: Terrain Category: Exposure of Roof: Exposure Factor, C,,,: Thermal Factor, Ct: Risk Category: Importance Factor, 1,: Flat Roof Snow Load, pf [psfl: Minimum Roof Snow Load, pm [psfl: Unobstructed Slippery Surface? Slope Factor Figure: Roof Slope Factor, C,: Sloped Roof Snow Load, ps [psfl-. Design Snow Load, S [psq: JOB NO.: U1878-1147-171 SUBJECT: GRAVITY LOADS Increase due to Original pitch loading 1.17 2.0 psf 1.17 1.0 psf psf psf psf psf psf psf P�o ASC E 7-10, Table 4-1 w/ Solar Panel Existing Array 7.2 7.2 31 31 30 30 C C Fully Exposed Fully Exposed 0.9 0.9 1.1 1.1 11 11 1.0 1.0 21 21 30 30 No Yes Figure 7-2b Figure 7-2b 1.00 0.65 21 14 30 30 ASCE 7-10, Section 7.2 ASCE 7-10, Table 7-2 ASCE 7-10, Table 7-2 ASCE 7-10, Table 7-2 ASCE 7-10, Table 7-3 ASCE 7-10, Table 1.5-1 ASCE 7-10, Table 1.5-2 ASCE 7-10, Equation 7.3-1 ASCE 7-10, Section 7.3.4 ASCE 7-10, Section 7.4 ASCE 7-10, Section 7.4 ASCE 7-10, Figure 7-2 ASCE 7-10, EquaticW7-44, ��ity of Ridge I YE n a i n E E R S PROJECT: Daniel Hughes Residence Summary of Loads Maximum Gravity Loads: JOB NO.: U1878-1147-171 SUBJECT: LOAD COMPARISON Existing With PV Array D (psfl 10 13 Lr [psfl 20 0 S 1pfsq 30 30 Existing With PV Array D + Lr IPSfl 30 13 ASCE 7-10, Section 2.4.1 D + S [psf] 40 43 1ASCE 7-10, Section 2.4.1 Maximum Gravity Load [psfl:1 40 43 1 Maximum Member Forces: LOCATION r- House (-,1:r)NAPTPV Span(ft) 36.4 (Approximate) Solar Panel Array Start, a (ft) 1.0 (Approximate) Solar Panel Array Length, b (ft) 12.7 (Approximate) Truss/Rafter Spacing (ft) 2.0 MEMBER FORCES Vertical Reaction, V, (lbs) Vertical Reaction, V, (lbs) Moment @ Center, M (lbs -ft) Existinq With PV Arrav Ratio 1475 1536 104% 1475 1490 101% 13427 13706 102% The member forces in the area of the solar array are not increased by more than 5%; thus, the stresses of the structural elements are not increased by more than 5%. Therefore, the requirements of Section 3403.3 of the 2012 113C are met and the structure is permitted to remain unaltered. M ion, DK I citv ')f I Wheat Ridge MAP VIEW 9505 West 38th Avenue Wlle'-It pidyE Rocky Mountam C,astroertercIogy APPLICABLE CODES 2014 NA TIONAL EL EC TP/C CODE (NEC) 2012 INTERNATIONAL FIRE CODE 2012 INTERNATIONAL BUILDING CODE (IBC) 2012 INTERNATIONAL EXISTING BUILD CODE (IEBC 2012 INTERNATIONAL RESIDENTIAL CODE (IRC) 2012 INTERNATIONAL MECHANICAL CODE 2012 INTERNATIONAL FUEL GAS CODE 2012 INTERNATIONAL PLUMBING CODE 2012 INTERNATIONAL ENERGY CONSER V. CODE OSHA 29 CFR 1910.269 UNDERWRITERS LABORATORIES (OL) STANDARDS OCCUPANCY& CONSTRUCTION TYPE OCCUPANCY -R3 CONSTPUCTION - V -B k 0 -atheran Medical Center ��rnerqel�cy Room 4' - , ) Hale'*'. Vavis GENERAL NOTES 1) CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO INITIATING CONSTRUCTION. 2) CONTRACTOR SHALL REVIEW ALL MANUFACTURER INSTALLATION DOCUMENTS PRIOR TO INITIATING CONSTRUCTION. 3) ALL EQUIPMENTSHALL BE LISTED BY THE U.L. (OR EQUAL) AND LISTED FOR ITS SPECIFIC APPLICATION. 4) ALL EQUIPMENTSHALL BE RATED FOR THE ENVIRONMENTIN WHICH IT IS INSTALLED. 5) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 6) ACCESS TO ELECTRICAL COMPONENTS OVER 150 VOLTS TO GROUND SHALL BE RESTRICTED TO QUALIFIED PERSONNEL. 7) ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 VOLTS AND 90'C WET ENVIRONMENT, UNLESS OTHERWISE NOTED. 8) WHERE SIZES OFJUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, CONTRACTOR SHALL SIZE THEM ACCORDING TO APPLICABLE CODES. 9) PV MODULES FRAMES SHALL BE BONDED TO RACKING RAIL OR BARE COPPER G.E.C. PER THE MODULE MANUFACTURER'S LISTED INSTRUCTION SHEET. 10) PV MODULES RACKING RAIL SHALL BE BONDED TO BARE COPPER G.E.0 VIA WEEB LUG, ILSCO GBL-4DBT LA Y -IN LUG, OR EQUIVALENT LISTED LUG. 11) GROUNDING ELECTRODE CONDUCTOR (G.E.C) SHALL BE CONTINUOUS ANDIOR IRREVERSIBLY SPLICED 12) ALL JUNCTION BOXES, COMBINER BOXES, AND DISCONNECTS SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION. 13) WORKING SPACE AROUND ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC SECTION 110.26. AERIAL VIEW SCOPE OF WORK DC System Size: 6.60kW AsphaltlComp shingle roof pitch: 7112 Anchored on 72 inch centers using UL listed racking system UV resistant cable ties (not zip ties) used for permanent wire management off the roof surface in accordance with (NEC 110.2,1110.3(A -B), 300.4) Junction boxes mounted flush w1roof surface '%� At Of IL I 12-y em P idgt jormEw DESIGN CRITERIA ��ZrZrrv'D' WIND SPEED: 135 MPH APPROVE[) EXPOSURE CATEGORY. C = liance �40' j r 0 SEISMIC DESIGN CATEGORY. D n a i n r= r= R s GROUND SNOW LOAD: 30 Ibs1ft2 65 1 W. GALENA PARK BLVD, STE 10? PH NE (SC 1) 990-1 775 INTERACTIVE PV SYSTEM DRAPER, UTAH G4C20 WWW.VECTORSE.CC� UTILITY SERVICE: 120124OV SPLIT PHASE vi., MAIN SERVICE PANEL: 150A RATED BUSBAR 4pla c aminer Date ASHRAE EXTREME ANNUAL MEAN MIN DENSITY DRY BUL ,z.WA-woroPPro-'0IP'0 v.1 ,I UAW a, a. approwl of DA�� ASHRAE 2% ANNUAL DRY DENSITY BULB TEMP: ordim rldmgwdeo'OfQ�Y"y qjv,.,hojrytovwaeojc--1-- SYSTEM SUMMAj?rfu'niAqto' v i ar athe d--- of he Cgy,h�jjwrbevofid, MODULE: (24) Canadian Solar CS6K-275M-SD 275W PV Module OPTIMIZER: (24) SOLAREDGE P300 DC Optimizers (Built into Module) INVERTER: (1) SOLAREDGE SE600OA-US 240VAC W1 RSD Compliance Configuration RACKING: Ironridge Roof Mounted PV System g7STELLAR IN-N1---1-'�'�!4'RA"1-;- 4020 Youngfied St., Wheat Ridge, GO 80033 P� (303) 729-4354 WWW.ENERGY-CONTRACTORS,COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT , WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC STRUCTURAL ONL 8/18/2017 SHEETINDEX PAGE NUMBER PAGE TITLE PV01 TITLE PAGE PV02 PROPERTYLINE PV03 SITE PLAN PV04 SINGLE LINE& ELECTRICAL PV05 APRA Y & STRINGING DETAIL PV06 ATTACHMENT DETAILS PV07 LABEL PLAN P/CS PICTURE PAGE SE RSD SOLAR EDGE RAPID SHUT DOWN DOCS' SPECS ASSORTED SPEC SHEET PAGES I APPLICABLE CODES 2014 NA TIONAL EL EC TP/C CODE (NEC) 2012 INTERNATIONAL FIRE CODE 2012 INTERNATIONAL BUILDING CODE (IBC) 2012 INTERNATIONAL EXISTING BUILD CODE (IEBC 2012 INTERNATIONAL RESIDENTIAL CODE (IRC) 2012 INTERNATIONAL MECHANICAL CODE 2012 INTERNATIONAL FUEL GAS CODE 2012 INTERNATIONAL PLUMBING CODE 2012 INTERNATIONAL ENERGY CONSER V. CODE OSHA 29 CFR 1910.269 UNDERWRITERS LABORATORIES (OL) STANDARDS OCCUPANCY& CONSTRUCTION TYPE OCCUPANCY -R3 CONSTPUCTION - V -B k 0 -atheran Medical Center ��rnerqel�cy Room 4' - , ) Hale'*'. Vavis GENERAL NOTES 1) CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO INITIATING CONSTRUCTION. 2) CONTRACTOR SHALL REVIEW ALL MANUFACTURER INSTALLATION DOCUMENTS PRIOR TO INITIATING CONSTRUCTION. 3) ALL EQUIPMENTSHALL BE LISTED BY THE U.L. (OR EQUAL) AND LISTED FOR ITS SPECIFIC APPLICATION. 4) ALL EQUIPMENTSHALL BE RATED FOR THE ENVIRONMENTIN WHICH IT IS INSTALLED. 5) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 6) ACCESS TO ELECTRICAL COMPONENTS OVER 150 VOLTS TO GROUND SHALL BE RESTRICTED TO QUALIFIED PERSONNEL. 7) ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 VOLTS AND 90'C WET ENVIRONMENT, UNLESS OTHERWISE NOTED. 8) WHERE SIZES OFJUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, CONTRACTOR SHALL SIZE THEM ACCORDING TO APPLICABLE CODES. 9) PV MODULES FRAMES SHALL BE BONDED TO RACKING RAIL OR BARE COPPER G.E.C. PER THE MODULE MANUFACTURER'S LISTED INSTRUCTION SHEET. 10) PV MODULES RACKING RAIL SHALL BE BONDED TO BARE COPPER G.E.0 VIA WEEB LUG, ILSCO GBL-4DBT LA Y -IN LUG, OR EQUIVALENT LISTED LUG. 11) GROUNDING ELECTRODE CONDUCTOR (G.E.C) SHALL BE CONTINUOUS ANDIOR IRREVERSIBLY SPLICED 12) ALL JUNCTION BOXES, COMBINER BOXES, AND DISCONNECTS SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION. 13) WORKING SPACE AROUND ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC SECTION 110.26. AERIAL VIEW SCOPE OF WORK DC System Size: 6.60kW AsphaltlComp shingle roof pitch: 7112 Anchored on 72 inch centers using UL listed racking system UV resistant cable ties (not zip ties) used for permanent wire management off the roof surface in accordance with (NEC 110.2,1110.3(A -B), 300.4) Junction boxes mounted flush w1roof surface '%� At Of IL I 12-y em P idgt jormEw DESIGN CRITERIA ��ZrZrrv'D' WIND SPEED: 135 MPH APPROVE[) EXPOSURE CATEGORY. C = liance �40' j r 0 SEISMIC DESIGN CATEGORY. D n a i n r= r= R s GROUND SNOW LOAD: 30 Ibs1ft2 65 1 W. GALENA PARK BLVD, STE 10? PH NE (SC 1) 990-1 775 INTERACTIVE PV SYSTEM DRAPER, UTAH G4C20 WWW.VECTORSE.CC� UTILITY SERVICE: 120124OV SPLIT PHASE vi., MAIN SERVICE PANEL: 150A RATED BUSBAR 4pla c aminer Date ASHRAE EXTREME ANNUAL MEAN MIN DENSITY DRY BUL ,z.WA-woroPPro-'0IP'0 v.1 ,I UAW a, a. approwl of DA�� ASHRAE 2% ANNUAL DRY DENSITY BULB TEMP: ordim rldmgwdeo'OfQ�Y"y qjv,.,hojrytovwaeojc--1-- SYSTEM SUMMAj?rfu'niAqto' v i ar athe d--- of he Cgy,h�jjwrbevofid, MODULE: (24) Canadian Solar CS6K-275M-SD 275W PV Module OPTIMIZER: (24) SOLAREDGE P300 DC Optimizers (Built into Module) INVERTER: (1) SOLAREDGE SE600OA-US 240VAC W1 RSD Compliance Configuration RACKING: Ironridge Roof Mounted PV System g7STELLAR IN-N1---1-'�'�!4'RA"1-;- 4020 Youngfied St., Wheat Ridge, GO 80033 P� (303) 729-4354 WWW.ENERGY-CONTRACTORS,COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT , WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC STRUCTURAL ONL 8/18/2017 DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECTS@DBMSOLAR.COM WWW.DBMSOLAR.COM J. Perry q the w DATE 07/17/2017 PROJECT# 2017 -STELLAR SHEET NAME COVER PAGE PAGE � PV01 � REVISION 0 M co Z C) C) 0 00 > 0 < (n 0 0 cy) 00 Lu LL = Z -17 U) LU C) C: M 0 U-) 0 (q 0 0 00 0(0 DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECTS@DBMSOLAR.COM WWW.DBMSOLAR.COM J. Perry q the w DATE 07/17/2017 PROJECT# 2017 -STELLAR SHEET NAME COVER PAGE PAGE � PV01 � REVISION 0 **PV Modules cannot be installed over vents F ,24 PROPERTY LINE 127' ASPER NEC 110.26, ALL EQUIPMENT SHALL HAVE A 30 INCH MINIMUM WIDE CLEARANCE AND A 36 INCH INIMUM DEPTH CLEARANCE I IAM 38th AVU 73f -7775 iE. com LEGEND ,�— 65 Photovoltaic Modules 40" METER WALL EQUIPMENT= Junction Box L TURTLE VENT (ON ROOF) = F1 DISTANCE FROM PROPERTY LINE TO CLOSEST EDGE= AZIMUTH COMPASS N 3 11350 10 20 0 3 40 31 0 30 33 0 30 20 0 0 29 7J 28 AZIMUTH W27 E 180 E2 )2 06 2 _0 2 0200 1�180"_0,151 s EQUIPMENT LOCATION NOTE.'�. 1) CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT PER NEC 319. O(D) 2) CONDUCTORS EXPOSED TO WET LOCATIONS SHALL BE SUITABLE FOR USE WET LOCATIONS PER NEC 3 10. B(C) 3) CONDUIT NOT TO BE INSTALLED CLOSER THAN 112" TO SURFACE OF ANY ROOF 4) DC CONDUCTORS EITHER DO NOT ENTER BUILDING OR ARE RUN IN METALLIC RACEWAYS OR ENCLOSURES TO THE FIRST ACCESSIBLE DC DISCONNECTING MEANS PER NEC ARTICLE 690. 1 (E) 5) ARRAYS SHALL BE INSTALLED IN A WA', THA T ENSURES THA T P V SOURCE CONDUCTORS SHALL NOT BE REDIL Y ACCESSIBLE. TELLAR 4020 Youngfield St., Wheat Ridge, CO 80033 P: (303) 729-4354 WWW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HERE N CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC 1* '.11 "Mul IrA DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E:PROJECTS 0 MSOLAR. DESIGNED( City 01 J. Perry DATE Wheat 1 07/17/2017 PROJECT a \13oilding DIvIS0n f 20XZ��TE(5W SHEET NAME PROPERTY DETAIL PAGE # PV02 � REV111ON 0 m (70 C:) C:) 0 00 a) 0 6i N < 0 0) 65 w LL 73 z LU L0 U) CD tz co C:) Lr) U) 0 00 0(0 DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E:PROJECTS 0 MSOLAR. DESIGNED( City 01 J. Perry DATE Wheat 1 07/17/2017 PROJECT a \13oilding DIvIS0n f 20XZ��TE(5W SHEET NAME PROPERTY DETAIL PAGE # PV02 � REV111ON 0 1/93 38th A V FZf- **A C DISCONNECT LOCATED 5' AS PER NEC 110.26, ALL EQUIPMENT SHALL HAVE A 30 OR LESS FROM MAIN SERVICE INCH MINIMUM WIDE CLEARANCE AND A 36 INCH PANEL MINIMUM DEPTH CLEARANCE 173 7C. SITE INDEX (D MAIN SERVICE PANEL 0 UTILITY METER 0 PRODUCTION METER 0 AC DISCONNECT (D DC DISCONNECT G) INVERTER JUNCTION BOX PV MODULES CONDUIT RUN (ACTUAL CONDUIT RUN DETERMINED IN FIELD) AZIMUTH COMPASS N 3 O�0350 " 20 3 32 30340350 3' 30 '0 20 0'0 0 0 0 70 21 AZIMUTH a, w 27 0 E 26 0 25 10 2 24 20 30 22 30 23 221 140 0 770 01 210200,9010 1 0, 770 '60 15 S FIRE CODE SETBACKS 3' 24 'r - ROOF DETAIL m co A B C D AZIMUTH 180' 6i N < U) < TILTANGLE 31' 8-0 Cm Uj Ll— z T— MODULE COUNT 24 LU .22 C: In Cn CD ROOF SUPPORT DETAIL Truss = 2X4 0 24 " 0. C. **PV Modules cannot be itistallea over vents ROOF DETAIL & ELECTRICAL SERVICE TEILLAR Wheat Ridge, CO 80033 P: (303) 729-4354 WWW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY. LLC STRUCTURAL ONL 8/18/2017 DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, ILLC E: PROJECTSOIW-MSOLAR.COM DES . Perry 178y:- i'll'ot DATEtvvneat Rid, 07/17/2-OYf PROJE lillcimr, CY n I 2Q,17-STECCAR SHEET NAME SITE PLAN PAGE 0 PV03 m co CD CD 0 F— 00 a) 0 6i N < U) < 0 8-0 Cm Uj Ll— z T— co :2 CO 3: LU .22 C: In Cn CD m C) U-) cf) 0 00 (D DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, ILLC E: PROJECTSOIW-MSOLAR.COM DES . Perry 178y:- i'll'ot DATEtvvneat Rid, 07/17/2-OYf PROJE lillcimr, CY n I 2Q,17-STECCAR SHEET NAME SITE PLAN PAGE 0 PV03 PV MODULE SPECIFICATIONS MANUFACTURER Canadian Solar MODEL CS6K 275M -SD STC POWER 275W NOCTPOWER 199W MAX OUTPUT POWER 600OW OPEN CIRCUIT VOLTAGE 8.3 V I _,tium I Ultfuul I LUr1r1=iV 1� (ISC) 15A I MAX SEHILS I­U�;L (C)GHL)) 1 gQA MAXVUL1AUL(VdC) 0 V MODULE EFFICIENCY 97.5% **SOLAP M'-'-IDULES** '4 CANADIAN SOLAR CS6K275M-SD *DC OPTIMIZERS OUTPUT 1 Voc PER MODULE & KEEPS VOLTAGE AT 350VMP*OPTIMIZERS BUILT INTO PANEL, NUNN HHORMIS UUMN: 0:::::: z O"MM: 'GEMENNOMM: PV WIRE INVERTER SPECIFICATIONS MANUFACTURER SolarEdge MODEL SE600OA-US (24OV) GROUND UNGROUNDED A C OUTPUT VOLTAGE 240V MAX OUTPUT POWER 600OW CEC RATED OUTPUT POWER 600OW RATED OUTPUT CURRENT 25A MAX INPUT CURRENT 18A MAX DC INPUT VOL TA5E 500V CEC WEIGHTED EFFICIENCY 97.5% MAX FUSE (OCPD) 35A #6 BARE COPPER EGC **INVERTER** SOLAREDGE SE600OA-US 600OW INVERTER UL1741 COMPLIANT RAPID SHUTDOWN COMPLIANT NEC 2014 690.12 1-4� 2 RAPID SHUTDOWN DEVICE SYSTEM SUMMARY (y) CY) ARRAYSTICPOWER 660OW ARRAYNOCTPOWER 4776W ARRAYCIRCUITS 1X14, 1X10 DC STRING MAX OUTPUT CURRENT 15A MAX AC OUTPUT CURRENT 25A MAX A C POWER OUTPUT 600OW CEC AC POWER OUTPUT 600OW 6GA 1201240V NON-FUSED AC DISCONNECT Lockable, with visible open Knife Blade Disconnect SE6GOOA-US Cl 1 A visible. accessible and wit in I O'of billing meter XC L Production Meter I F El 1(9 DC DISCONNECT -J 73 CONDUCTOR SCHEDULE WITH NEC ELECTRICAL CALCULATIONS (y) CY) C:) C:) NO. OF CNDRS. RATED 00 0 TEMP. CORR. FILL ADJ. CONT MAX BASE DERATED WIRERUN ID DESCRIPTION CONDUCTOR CONDUIT IN CNDT AMPS EGC FACTOR FACTOR CURRENT CURRENT AMPACITY AMPACITY DISTANCE 1 DC CIRCUIT. SERIES STRING 10AWG PV WIRE FREE AIR NIA 15A 6 A WAS BARE 0.96(34�C) NIA 15A 23.4A 35A 33SA 20ft OUTPUT TO JUNCTION BOX COPPER COPPER 2 DC CIRCUIT (TRANSITIONED): 10 A WG THWN-2 314" DIA EMT 4 15A 10 A WG THWN-2 0.96(34�C) 1 15A 23.4A 35A 33SA 2oft JUNCTION BOX 7-0 INVERTER COPPER or EQUIVALENT COPPER 3 INVERTER OUTPUT: INVERTER 8 AWG THWN-2 314" DIA EMT 3 25A 10 A WG THWN-2 0.96(34�C) 1.0 25A 31,25A 50A 48A Sft TO AC DISCONNECT COPPER r EQUIVALENT COPPER 4 AC DISCONNECT OUTPUT. AC DISCONNECT TO PRODUCTION 6 AWG THWAI-2 314" DIA EMT 3 25A 10 A WG THWN-2 0.96(34-C) 1.0 25A 31.25A 50A 48A 5ft METER COPPER or EQUIVALENT COPPER 5 PRODUCTION METER OUTPUT. PRODU TIONMETEPT02NOAC 8 AWG THWN-2 314"DIA EMT 3 25A 10 A AG THWN-2 0.96(34-C) 1.0 25A 31 25A 50A 48A 5ft DISCONNECT COPPER or EQUIVALENT COPPER 2ND AC DISCONNECT OUTPUT. 2ND AC TO POINT 8 A WG THWN-2 114" EMT DA 3 '5A WN 10AWGTH -2 0.96(34�C) 1.0 25A 31.25A ScA 1 4. 6 DISCONNECT COPPER rEQUIVALENT COPPER OFINTERCONNECTION *ROMEX AMPACITY LIMITED TO 60� VALUES. IF USED, SIZE ACCORDING TO NEC TABLE 310.15 *DC Conduit must be marked in accordance with NEC 690.31, Labeling must be every 10'and comply with NEC 690,31. SeePV06forlabelplan, 'All DC Conductors Must Be Protected With Metal Conduit ELECTRICAL NOTES SPECIFICATIONS 1) INSTALLATION SHALL COMPLY WITHALL REQUIREMENTS OFNEC2014 AND ANY APPLICABLE LOCAL AMENDMENTS. 2) MODULE INTERCONNECTION CONNECTORS SHALL BE IN COMPLIANCE WITH NEC 690.33(A) AND SHALL BE POLARIZED AND NON INTERCHANGEABLE WITH RECEPTACLES IN OTHER ELECTRICAL SYSTEMS ON THE PREMISES. 3) MODULE INTERCONNECTION CONNECTORS SHALL BE OF THE LOCKING TYPE REQUIRING A TOOL FOR OPENING IN ACCORDANCE WITH NEC 690.33(C). 4) MODULE INTERCONNECTION CONNECTORS SHALL BE MARKED "DO NOT OPEN UNDER LOAD" IN ACCORDANCE WITH NEC 690.33(E). 5) THE CONNECTION OFALL MODULES SHALL BE ARRANGED SO THA T THE REMOVAL OF ANY PANEL OR MODULE SHALL NOT INTERRUPT A GROUNDED CONDUCTOR TO ANOTHER PHOTOVOLTAIC SOURCE CIRCUIT IN ACCORDANCE WITH NEC 690.4(C). 6) ALL EQUIPMENT IN PHOTOVOLTAIC SYSTEM SHALL BE LISTED BYAN INDEPENDENT TESTING AGENCY. 7) THE GROUNDING ELECTRODE CONDUCTORS SHALL BE CONTINUOUS IN COMPLIANCE WITH NEC 250.64(C) AND 250.160. 8) THIS SYSTEM CONFORMS TO NEC 2014, CODE 690. 11, WHICH REQUIRES THAT PV SYSTEMS WITH DC SOURCE CIRCUITS, DC OUTPUT CIRCUITS, OR BOTH, OPERATING ATA PV SYSTEM MAXIMUM SYSTEM VOLTAGE OF 80 VOLTS OR GREATER, SHALL BE PROTECTED BYLISTED (DC) ARC -FAULT CIRCUIT INTERRUPTER, OR OTHER LISTED COMPONENTS TO PROVIDE EQUIVALENT 4 \ / 5 10'OR LESS - IV F PVAC DISCONNECT 60A 1201240V FUSED A C DISCONNECT 35-1 FUSES Lockable, with visible open Knife Blade Disconnect Cleartnvisible, accessible and wit O'of billing meter I F - I I PV LOAD CALCULATIONS: SUPPLY SIDE TIE-IN I 150A RATED MAIN PANEL 150A * 100% = 200 150A (MAIN BUS ALLOWABLE SOLAR) 150A AVAILABLE FOR PV 705.12(A) & 690.64 ICAL SUPPLY SIDE CONNECTION USING KUP-L TAP INSULATION PIERCING CONNECTORS (TAPPED) NEC 705.12 (A) 150A-2FT" TO EXISTING LOADS #6 GEC SCHEMATIC NOTES 1) INTEGRATED DC DISCONNECT IS PROVIDED WITH INVERTER. DISCONNECT IS LISTED FOR USE WITH SOLAR EDGE UL 1741 LISTED STRING INVERTERS. 2) PV PRODUCTION METER SOCKET SHALL BE IN COMPLIANCE WITH SECTION 4.13 OF THE AC;t:L ENERGYSTANDARD. 3) PV PRODUCTION METER SHALL HA VE THE PV GENERATION WIRED TO IT'S LINESIDE TERMINALS (TOP OF METER BLOCK). 4) PV PRODUCTION METER SHALL HAVE A STAMPED BRASS, ALUMINUM, OR STAINLESS STEEL TAG INDICATING THE ADDRESS INCLUDING UNIT, AND "PV PROD" IN ACCORDANCE WITH THE REQUIREMENTS FOR METER IDENTIFICATION IN SECTION 4.14.4 OF THE XCEL ENERGY STANDARD. 5) PV PRODUCTION METER SHALL BE LOCATED WITHIN 10 FEET IF THE MAIN BILLING METER. 6) PV PRODUCTION METER SHALL BE RATED TO HANDLE A T LEAST 35A OFAC CURRENT. PANEL. MAIN SERVICE PANEL 4W STE,LLAR Wheat Ridge, CO 80033 P: (303) 729-4354 VAVW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBIVI SOLAR DESIGN AND CONSULTING COMPANY. LLC DBM DESIGN 11T �,Rvk DBM SOLAR DESIGN AND PV PRODUCTION METER NOTES CONSULTING COMPANY, LLC E: PROJEQ;9@!`D8MSQLAR.COh 1.) The self-contained metering will be in compliance with the current revision of the Xcel Energy Standard; specifically W DBMSOLAR.CQM 9W Section 4. 11, or as may be amended. t I DESIGNMAY J. Perry 1A11- 2.) The PV production meter will be required to have the PV generation wired to the lineside terminals (top of meter block). DATE. zo 07/17/2017 3.) The meter socket for the PV production meter shall be marked with a stamped brass, aluminum, or stainless steel tag, PROJECTN I indicating the address including the unit, typically "PV PROD" in accordance with the requirements for "meter Identification" 0 7 EUAR in Section 4.14.4 of the Xcel Energy Standard, or as may be amended. SHEET NAME SLDI ELECTRICAL DET 4.) The PV production meter shall be located within ten (10) feet of the existing utility meter. If there is any reason this PAGE # REVISION cannot be accomplished, the approval of the proposed P V production metering will need to be obtained by the local electric PV04 0 (y) CY) C:) C:) 0 00 0 Ed N < U) > < C) U) 0 a 6 C 1) 2i LIJ LL z cy) F– C/) W CU (2) 0 F- C CU 0 U') C/) 0 00 DBM DESIGN 11T �,Rvk DBM SOLAR DESIGN AND PV PRODUCTION METER NOTES CONSULTING COMPANY, LLC E: PROJEQ;9@!`D8MSQLAR.COh 1.) The self-contained metering will be in compliance with the current revision of the Xcel Energy Standard; specifically W DBMSOLAR.CQM 9W Section 4. 11, or as may be amended. t I DESIGNMAY J. Perry 1A11- 2.) The PV production meter will be required to have the PV generation wired to the lineside terminals (top of meter block). DATE. zo 07/17/2017 3.) The meter socket for the PV production meter shall be marked with a stamped brass, aluminum, or stainless steel tag, PROJECTN I indicating the address including the unit, typically "PV PROD" in accordance with the requirements for "meter Identification" 0 7 EUAR in Section 4.14.4 of the Xcel Energy Standard, or as may be amended. SHEET NAME SLDI ELECTRICAL DET 4.) The PV production meter shall be located within ten (10) feet of the existing utility meter. If there is any reason this PAGE # REVISION cannot be accomplished, the approval of the proposed P V production metering will need to be obtained by the local electric PV04 0 ARRA Y DETAIL P300 P320 P370 P400 P405 (for 60-ce I[ nwd- Ito, hagh-Po'A.'- (for?,..gher-powe, Itot 72 & 96 -cell (for th, n Mir, 41 60 and 7 2- -.t ules) 60 -tell rnod&Acs�) P-toduhisl modules) mcculesi INPUT R.iled 111pul, CC -100 4 0 At'�olwr krammur, ELI I - IVUL dt lvwu-'� tein4cIdLurf2� -q X i0 I , -JL U17 cu'rem 13 FAIMMUM UT �M:L� �*z� 0 1, L" OUTPUI DURIN5 OPERATION JPDWER OP71MIZER COMNECTED TO OPERATING SGIAREDGE INVERTER) OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF1 Safety juiput ;13eiur ") L'ItITTA `-`, Operat7ng Temperature Range STANDARD COMPLIANCE F-3 5- 07V POINT VOLTAGE (Vmp) P-6 tvc! " V"�T'nd S'Afetv lkld�s It S.Vwy�. US I i" i VOLTAGE I'Voc) yc� INSTALLATION SPECIFICATIONS N MaAryium Allovjc,� !q -Ii m �cftagc < CC, 211 S0141 ��k SIfIgI--' IF) Jle P 1C I �-'t 00 PV SYSTEM DESIGN USING SINGLE PF4ASE W"w' 4 128 x 1!,,2 x 2i 1� 97 Ob "'e -chi ."J'joing L"U!e�� A SOLAREDGE tNVERTERLK" HD-WAVL MC 4 Lij E co ic Anuhur ulA;i; U) C) 0 Q� Dout.,Ie vmAdtao: `J'�Pat 'AtC IYPU!'CC� .'L'.L- Dwjule TAC -1 co'nuatibit: MC." / V'-UbIV ifl!�LIJWJ: MCI CUMPX.iDil AT,iuf,#-,, A A�4-i .1LIL O.I.Put '.'hle Lent.!", is i 3-C. I A-9 POINT CURRENT (imp) Operat7ng Temperature Range -40- -,'651-40 --185 F-3 5- 07V POINT VOLTAGE (Vmp) P-6 tvc! " V"�T'nd f NLV.AL-P F-5-0-0V� VOLTAGE I'Voc) ReIjtw,z Awnl�d,', 0 - 1yj N CURRENT(Isc) < C/) 00 PV SYSTEM DESIGN USING SINGLE PF4ASE SINCLt PHASE TIAREE PHASI 208V THREE PHASE 480V Uj A SOLAREDGE tNVERTERLK" HD-WAVL U) Lij E co N!, St—ld Le'19A S U) C) 0 Q� it, Lf') .0 (Kwui Qptir,.ue,�� 511'r% ":;gth 0 (Kwel Nljxurfum Pc-wvr p--, Svwd (LLXJJ �th Pivallel �trwe2� 0 Cli'left,rit Lcagtil� or Iv "T Basic String Diagram of Grid- Tied System with 0-,D-tl'ml'zers Solar Ec�qe DC Optimize + + #10 PV Wire Junction Box PV Source Circuit Equipment Grounding C)nducto� To Inverter PHOTOVOLTAIC AC OUTPUT LABEL AC OUTP JT CURRENT 25A NOMINAL AC VOLTAGE 240V DC DISCONNECT CALCS RATEDMAXPOWER POINT CURRENT (imp) (70 MAXIMUM POWER F-3 5- 07V POINT VOLTAGE (Vmp) MAXIMUM SYSTEM F-5-0-0V� VOLTAGE I'Voc) SHORT-CIRCUIT N CURRENT(Isc) < Photovoltaic Array String Detail (14) Modules String A (10) Modules String B Attachment Diagram Module Overhang Cantilever = 33% of MAX rail spar 25% jf--,\ (9 I k—J E) 50% E) e--. 25% PV Module ail 72" MAX rail span with staggered attachments to distribute weight across support trusses *See Attached Data Sheets for More Information W rSTELLAR1 1 1-71, "i'l �: 401-1 1 1 4020 Youngfield St., Wheat Ridge, CO 80033 P. (303) 729-4354 WWW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC tot ni* DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECrS4DBMS0LAR.COM DATE: 17 IRIIEITI 201 -STELLAR SHEE NAME� 4RRAYISTRINGING DETAIL PAGE # REMSiON PV05 0 co (70 C) CD 00 Lij 0 N < < C/) 00 0 Fy Uj z U) Lij E co Lo a) CD = U) C) 0 Q� U) 0 Lf') .0 6 (0 tot ni* DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECrS4DBMS0LAR.COM DATE: 17 IRIIEITI 201 -STELLAR SHEE NAME� 4RRAYISTRINGING DETAIL PAGE # REMSiON PV05 0 A TTA CHMENT DETAILS . . I . 11 . I � ATTACHMENT NOTES 1 ROOF MEMBERS AND PENETRATIONS TO BE DETERMINED IN THE FIELD 2 LAG SCREWS SHALL BE 5116" X 3.5" WITH A 2.5" MINIMUM EMBEDMENT 3 THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY RAFTER DIMENSIONS PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 4 C5 SHALL t5L AFPLIED IN AGGUHDANGL- WIIH MANU�-AC; I UHL:H5' i�� 5 If- I-HEHE IS ANY GC)Nh"W//kR ULPIC; I L -D HL-HF-A7VU-- INSTRUCTIONS PROVIDED BY THE MANUFACTURER, MANUFACTURERS' 1NSTRUcTjnNSSHAI I .13UPFRCFDF ROOF INFORMATION ROOF TYPE COMPOSITE SHINGLE PITCH 7:12 RAFTER SPACING 24 " 0. C. RAFTER DIMENSIONS 2"X4" LA YERS OF ROOFING 1 STRUCTURAL CALCULATIONS WIND EXPOSURE CATEGORY C DESIGN WIND SPEED 105 MPH -SECOND GUST) DESIGN GROUND SNOW LOAD 30 PSF TOTAL WEIGHT OF ARRAY 1020 LBS POINT LOAD (NO SNOW LOAD) 22 LBS DEAD LOAD (NO SNOW LOAD) 2.4 PFS IDEAD LOAD (30 PSF SNOW LOAD), 32.4 PFS LAYOUT SPECIFICATIONS NUMBER OF MODULES 24 NUMBER OF ATTACHMENTS 46 AREA 422.5 ft2 AZIMUTH 180- YECTOR n a I I E! rz R 5 65? W. GALENA PAQK BLVD. STE. � 01 PHcNE (SC 7) 99C- 1 775 DRAPER, L17A� 04D20 w- VECTORSE. co� CNTELLAR Wheat Ridge, CO 80033 P: (303) 729-4354 WWW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT , WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC STRUCTURAL ONL m; EO 8/18/2017 co m c:) c:) 0 00 6i 0 N < 0 uj LL z U) LIJ V) c:) ti c: CD m to U) 0 00 o co DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECTSCDDBMSYLAR.COM WWW.DBMSOLA -11y of DESIGT BY: /,�. Perry DATE: � IA - "-a j(lo BIRT/17/0f PROJECT1, --9 l)lVjS,),. 2017-STE.k,LAR SHEET NA E ATTACHMENT DETAIL PAGE 0 P V06 I 1EVISOM 0 WARNING ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH LINE AND LOAD SIDE MA Y BE ENERGIZED IN THE OPEN POSITION LOCATION: (1) COMBINER BOX (2) JUNCTION BOX (3) BREAKER PANEL (4) DISCONNECT SWITCH (5) INVERTER (IF USED) lk 4.5" —41 WARNING DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM L OCA TION.- MAIN SERVICE LABEL NOTES A. RED BACKGROUND B. WHITE LETTERING C. MINIMUM 318 LETTER HEIGHT D. ALL CAPITAL LETTERS E. NON BOLD F. MATERIAL SUITABLE FOR ENVIRONMENT G. SIGNS MUST BE REFLECTIVE lk 4.5" WARNING: PHOTOVOLTAIC POWER SOURCE LOCATION: DC CONDUIT (REFLECTIVE CONDUIT LABEL) PER NEC 690.31(B)(1-4) ic 4.5" PHO TO VOL TA IC A C DISCONNEC T MAXIMUM AC OPERATING CURRENT, F -25-A7 NOMINAL AC OPERATING VOLTAGE: = (�) I MA IN SER VICE & A L L BA CK FED PA NEL BOA RDS 0 "PHO TO VOL TA IC S YS TEM EQUIPPED WITH RAPID SHUTDOWN" (D "PHO TO VOL TA IC S YS TEM CONNECTED" "MUST BE YELL,., N WITH BLACK LETTERING— @ "PVAC DISCONNECT" **MUST BE YELLOW WITH BLACK I F-r-ER/N'-3, - (�) JUNCTION BOX STRING INVERTER DC DISCONNECT CAL CS RATEDMAXPOWER POINT CURRENT (Imp) MAMMUMPOWER F3-5--� POINT VOLTAGE (Vmp) OV MAXIMUM SYSTEM F-5-0C-,V� VOLTAGE (Voc) SHORT-CIRCUIT CURRENT (Isc) L OCA TION: S TPING IN VER TER (IF USED) 4.5" WARNING DO NOT ADD ADDITIONAL CIRCUITS TO PANEL L OCA TION: (1) MA IN SER VICE (2) A C COMBINER PANEL A C DISCONNECT I OA 8 4.5" CAUTION PHO TO VOL TA IC S YS TEM CIRCUIT IS BA CKFED cl L OCA TION: (1) MA IN SER VICE lk 4.5" WARNING: INVERTER OUTPUT CONNECTION DO NOT RELOCATE SOLAR BREAKER L OCA TION: (1) MA IN SER VICE (2) AC COMBINER PANEL (3) ALL BACKFED PANELS "RAPID SHUTDOWN DISCONNECT" DO NO T DISCONNEC T UNDER L OA D 0 FOR ILLUSTRATION ONL Y (NOTACTUAL MSP) PV SUB PANEL MAIN SERVICE PANEL A 11 [] El D E H F FOR MICRO INVERTERS ONLY (NO KNIFE SWITCH DISCONNECT) OTELLAR 4020 Youngfield St., Wheat Ridge, CO 80033 P: (303) 729-4354 MAIW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECTS@D6MSOLAR.COM /9�WW D %SOLAR.COM DESIrED BY vvi: v4� EL9 9CII07/1 /2,017 2017-STE-CLAR 11EIT IAME LABEL PLAN PAGE 11 PV07 REV1101 0 c:) c:) 0 00 'o N < < 0 cf) Of 0 w ILL. Z3 z T- U) w -2 W c:) Lr) 00 C) Q (D DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECTS@D6MSOLAR.COM /9�WW D %SOLAR.COM DESIrED BY vvi: v4� EL9 9CII07/1 /2,017 2017-STE-CLAR 11EIT IAME LABEL PLAN PAGE 11 PV07 REV1101 0 PICTURES ELECTRICAL \1 �IYECTOR n G i In C- IME R 8 651 W. GALENA PARK BLVD. STE. 10 1 PH'NE '80 ) 99C-7 775 DRAPER, UTA� 84020 WWW.VE`CTDRSE.00M STRUCTURAL ,o'TELLAR Wheat Ridge, CO 80033 P: (303) 729-4354 WWW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC 8/18/2017 DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECT,5940ahLSOLAR.CO DESIG . Perry Ty: i "ty OT vvneat Rid 07/17/2017 PROJECTVullaing Divisc 2N.,7 -STELLAR SHEET NAME PICTURE PAGE PAGE A � PEVIS1111 PICTURES 0 0 co 0 �' 0 < < cm 0 cm u— :D -0 2 ui z T— uj c: cn co 0 00 o (D DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECT,5940ahLSOLAR.CO DESIG . Perry Ty: i "ty OT vvneat Rid 07/17/2017 PROJECTVullaing Divisc 2N.,7 -STELLAR SHEET NAME PICTURE PAGE PAGE A � PEVIS1111 PICTURES SOLAREDGE RAPID SHUTDOWN sula Rapid Shutdown Kit - Installation and Configuration (Single Phase Inverters) This document desusbes how to instal the rapid shutdown kh in the SolarLdge SafeN Switch, and how to enable the rapid shutdown feature in he inverter in orderto pro�vide the functionality described In the Rapid Shuidoo& n clause of NEC2014 6W. 12 [11 th rough, (4) � Kit Contents Rapid shutdown cables )Aicfo-SD card and 5D card adapiterAith firmwafe flies (Note. 00 NOT THROWAWAY lH E CARDAND THL ADAPILR; keep for PristallaTion of other rapid shutdown kits) Cable Installation Perform this procedure before conneriniC the strings to the Safe*v Switch (Chapter 4: Connecting the AC and the Strings to the Safety Switch in the 3earEdge InsioNwicia 6utdel- I I urn the inverter ONIOFF switch to OFF. if Installing the kit in an inverter thaz Is already operating, vialt until the LCD ndicates that I he DC voltage is safe IcSUV), of wait five minoes before contintiing to The next step. 2 Turn the Safetv SwItO and the At switch on the main circuit board to CIFF. W 0 Ifyou cainincit see the inverter panel. or if a maffur42m Is IndoMed an " LCO painel. wMit five niuMeslor V* input capacton of the inverharto cits Marge. 3 Loosen the four Allen 5crews ion the front cover of z:he Safetv Switch. and open �he covei. 4 Cafefutly disconnect the two UC cables from the left side Ofthe SWItLh and from the DL connection spring clamp terminals, as illustrated below', Use a standard straight -bladed screwdriver io disconnev the tables from the terminals. Sr.fth tarmnal d4xk -4ft AIL Dketimmacl owe oc carinwan 1cminall, Diocennect item Filgium 1: Irmkft the ACM SaWr WIX It 17m -mermal mmpanent P%&* v40 depeaea* er, the Sallerp SAVChmn"; the d�nW1MACfDCSz10tq 5.Vff&1flr tlnille;ninace .T_S-.':.4 MV bn�,fftl?M RajWd Shutdomm Kit Instakadan - MAN -02 -Ml &5-1.6 W. solar =11 7 ficipid Shutdown Kit - Instollarion and -Coq(tguration .15migle Phase Inverters) 5 The rapid shutdown cables have a resistor cor; nected to one end Ion the red cablel. Can nect these erKls- to the s�ivltch, ritaking sure that the red and black cables are fever sed relatrve to zhe cablees connected at the top of thoe_ switch (going Into the DC side -conduit bet-oveen the inverter and the Safety Switch), as detalled bebw. Apply a tot a ue of 2 N*M (18 11641n); it -,he cables at �he top are red and black from left to right, conaw as shown t�elow_ R01-1 Egack(-j SINk 4.) Red I-) vmh rapid OV -W~ Wis. Of Figure 2. Rapid shAdown cattle canawmad - aptkin I Ifihe cables at the top are black and red from left to right, connect as shipown below- EM91i 0 Radii-) ry— ftJ T-5 vMh rapid 131ack sh.ddoon resiwar Figure 3; Rapid shindiiwn cable cannoand - apotian 2 9 Use a standard stfaight-bladed screw-cim-er to connect theoth-ar erdofthe rapid shutdown cables toThe IDC connection sprimg-clamp terminAs: Connect the black cablefromthe switch tothe DC- tei minA black, andconnext the read cable from the switch tothe DC- ierminalblock. 7 Checkthai the cables aire locatedaro connectedin thecorrect positions toensurethe rapid shutdown functionality. 13 Close the cover. Attach theswitchcover and secure it bv tigh-,ening the fourscrewswith a toFqueof0.9f`t.*Ib 12.2 N*rn. Rood vtutdown Kit 11115tadatlan - MAN-01-WISFP-1.6 5 OTELLAR Wheat Ridge, GO 80033 P: (303) 729-4354 CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY. LLC DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECT_100BMSOLAR.CO J. Perry DATE i - - - � I- I � 0 7 /17/2017 PROJECT N 26i77STELLAF SHEET NAME SolarEdge RSD PAGE ft SE RSD I REVISION: 0 cy) ce) 0 0 0 00 > 0 L]Ij N < < 0 0 ch 00 -M Uj LL :3 z T_ or) U) LLJ LO a) U) 0 0 -C L0 0 (P U) 0 00 3: 0 co DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECT_100BMSOLAR.CO J. Perry DATE i - - - � I- I � 0 7 /17/2017 PROJECT N 26i77STELLAF SHEET NAME SolarEdge RSD PAGE ft SE RSD I REVISION: 0 SOLAR MODULE SPECSHEET ENGINEERING DRAWING (MM) Rear VieW FrOMC CTU�.S SC(Elen A -A ..000a- CanadianSolar i Mountino 1-1011-- Opoor?),zed by CS6K-2701275128OM-SD solar=,/ Carradiar) Solar's SmaraX module fcatuF es an innovative integration of Canadian Solar's friodule technology and SolarLdtje's pmver ciplimization for grid -tied PV applications. By ireplacing the traditional junction -box with a power optirritueor, the Sm-anDC i -nodule opUmues power output at modult-levell. With this feature, the SmartDC module can eliminate module - level mismatch and decrease shading losses. Fur ther Moore, the Sinaru)( goodule provides rnodulle-levelmonstorinq that allows effective systom Management arld Minlinizes opefationa I costs. KEY FEATURES frOln CaLh ITIOdUIC Maximizes power ficifn ead) individual module against poteintiall rnismatch risk Decirearses shading losses Htegoated smart solution. no need to add other accessories Enhances thee shading tolerance Rcdiuces BoS Cost� Up to 11.25 kw - 12-75 kW per striiiq allows for more.modules to be based on differ'LKA inverters Fr,:,� rinfidule-level minnitaring ny:,-�em Full visibility of system perfotmance %vith a free smartphone app Saft�ty Automatic drop of DC current and voltage when inverter or grid power is shut down CANADIAN SOLAR (USA) INC. 25 linear power output warranty yr— i 10 product warranty on materials years and workmanship MANAGEMENT SYSTEM CERTIFICATES* ESO 9M1.2006; Quality inanagemenE S�Stellh LSOITS 16949-20M f The autaniotive industry quality managen*m system ISO 14WI.20041 Stai*dafd1#ai erwifotirr.enraf marag#rnenlsysu!� OKSAS 180012007 1 Internavonal standardi for COCCUPALlonal health &!Lately PRODUCT CERTIFICATES* EEC 61 Z' , 5 1 JEC 63730! VDUCE UL 1703,1 IEC 61215 peffoi mance- CEC list ed (US) UL 1703. CSA 'As there am ciftrem tcrtificmloi mqui.-vrem.sal diflerent ;narkc--%,jl caw corr.jr, yc� Eanad,an �*Iar sales reammnwa�v Itor ttr saacft rc�.lficatcs appkah�c to tMe products. CANADIAN SOLAR INC. is COMMittedLO providing high quality solar products, solar System solutions and services to customers arourd the world. As a leadlN� manufacti.ver of solar mod ules and PV project developer with over 14 GW of pie tiniturn quality modules deployed around the world since 2001, Canadian Solar Inc. (NASDAQ: CS1Q) is one of the most bankable solar cofnpanle�, wotidwide. ELECTRICAL DATA I STC Fliiwer Optimizer j.unnerLLd to a %,ularEdgu 1nvcr1E:r CS6K 271)M�51�� -SD Nam. Max. PWR (Prnax S1 C) 27OW 2 7-1) W _j �WW Nam. Max. PWR (Pmax NOC-t) 195W I%W 202W Open Circuit Voltage (Voc STC) 38.2V A3V 38.5v Output Voltage Range (Viout) 5 -WV 5�FJ) V 5av Max. Output Curtent 41max) 15A 15A 15A Max. Series Fuse Rating 20A 20A 20A Module L 1650% ILW% 17.11% Output During Standby is EU& (power optiomizei disconnected 1 V 41 from inverter at inverter off) 4D 'Aa� String APAC PV SYSTEM DESIGN ph 1650 o; 992 x 40 nrino (65-0 x 39.1 x 57 ir,i weight 19- K9 ru& 3 ph 3-2 rAm te mpeted glass 16 Anodi2ed aloutainiturn alloy Ni.a.-Siring APAC bj Cable PVl-F 116.0rTffn1/952 mrn 3 ph - V.V 4 4 18 26 pieces, 548 kq (1208 lbs) Length ---- - --- . . .... ... -- 728 pieces (40' HQ) US & � ph— 8 Canada 3 ph 4208 A 10 1� V ,!b 10 40 , ph 19 is EU& 3pn 41 40 4D 'Aa� String APAC 3ph--MV 47___ 46____45 Length US& I ph 39 19 is Canada 37p�(: 22 21 211 pro 52so ELI& -, 3ph 11250 Max. Power APAC 3 ph - Mv 12750 per Stfin rvd) US& , pro 5250 Canada 3 ph C-08 V) 6wo Parallel Se irgs of D01. Lengths Yes Patallleq Svirgs of Diff. Choarmations Yes Cipeialirsg Temperature -401C - 4F -'C M a ot- Sy-sif fr Vot wit I COO V (1EQ 1600 V NO Appitaltion ClasSif*Cation Class A -Ty0e I (UL 1703) 1 rii e Raton; Class C (3EC61730) 15cmet Toleiarice 0 - 4 SAi CS6K-230M Y IN CURVES A .4, 1 A To - E 'ODU W., ow W., V t 10 IS ID �S At is 46 MECHANICAL DATA OF PV MODULE SPCLJlLJt1ort D jtj Call I ype Mono-aystalline. 6ifth Cell Allaq9tMent 60 (6m 10) Dimensions 1650 o; 992 x 40 nrino (65-0 x 39.1 x 57 ir,i weight 19- K9 Front Cover 3-2 rAm te mpeted glass Frame Material Anodi2ed aloutainiturn alloy 6 bj Cable PVl-F 116.0rTffn1/952 mrn Connectors 4 4 Standard 26 pieces, 548 kq (1208 lbs) Packaging (quantity & weig it per pallet) Module Pieces 728 pieces (40' HQ) per Co�ntakni�r I to 1� V ,!b 10 40 E 'ODU W., ow W., V t 10 IS ID �S At is 46 MECHANICAL DATA OF PV MODULE SPCLJlLJt1ort D jtj Call I ype Mono-aystalline. 6ifth Cell Allaq9tMent 60 (6m 10) Dimensions 1650 o; 992 x 40 nrino (65-0 x 39.1 x 57 ir,i weight 19- K9 Front Cover 3-2 rAm te mpeted glass Frame Material Anodi2ed aloutainiturn alloy J-BQx IP6S Cable PVl-F 116.0rTffn1/952 mrn Connectors MC4 Standard 26 pieces, 548 kq (1208 lbs) Packaging (quantity & weig it per pallet) Module Pieces 728 pieces (40' HQ) per Co�ntakni�r TEMPERATURE CHARACIrERISTICS D11 L Temperature Coefficient (Pmax) -0-41 % /oC Temperature Coefficient (Voo -0.319h jr., 'temperature Coefficient (tso 0,053 % /1C Nominal Operating �01 Tem�orature 45±2*C STANDARD COMPLIANCE Specification--.-- st"llidard EMC FCC Partl5 Class 8, IECbI000-6-21. JEC61000-6-3 PV Module [EC6121 5, lEC61730, LIL 1703, CEC hStj PV Optimizerji-Box ENS0548. LIL3730, 1EC2109-1 iclass 13 safet V). UL 17-11 Fire Safety VDL-AR-L 2100-712:2013-05 PARTNER SECT[ON CANADIAN SOLAR (USA) INC. March- 20116. All rights reserved. PV Module Product DaLasbeet VS.4-NA -j "TELLAR 402' Younge" S',.33 11e.1 Rlg,, CO 80 P: (303) 729-4354 WWW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, 1-1-C 0 F- < 0 LL z Uj .0 cl) 0 I = (1) 00 L0 C:) Lr) 00 W N W F -- U) Se U) CD 0 (�p 0 C-0 49 DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECTS(d),DBMSOtAR.COM I DESIGrD BY. VVURiPrr,y',', � I DATE. `007/1,71,17 201�--STELLAR SHEETNAME MODULE SPEC SHEETS PAGE# SPECS I R-ISIGN: 0 solar =ee:- SolarEdge Single Phas For North America SE300OA-US SE38,j0A-U,--,f SE5000A SE760DA-IJS SE10000A-US." SE1140C INVERTER SPECSHEET The best choice for SolrarEdge enabled systems ;,vtag ,rated arc hut prateLtion fbr WC 2011 6W.11 COMPUTIce 1;Iap,d shutdown for REC ZOL4 6W. 12 Superior 4-ftienc4 (934) small fie I., ghumight m -ed e&'Syto qirtairl an proaded bracket Emilt-in module-levv� mootitoring !Titerrret. connecticin through Ethernet or viirelm Wdoo- and inrjocir insta llabon 9jxed vctage toverter, IDC. -AC canviimon an -y ?re-assmbled 5a-etv Shvitch forfas.ler inf--aliation optiorial - revenue graide daU. 4451 C12.1 P I- F P A �- E Lt H. J— 1` L 1.1 E E-� F --A C 1 11 j _ S` ',EL L —pp.— -- smulf-lip -Pp— �jb Ngu- ;j— li� "#1 11:0 Iii—irt—i i Will: n rr—rrw— VMIAN M"t ?6:,W V.., It".2407 40�!, 06h: nw - US=K%L4i nTELLAR 401� I � ( 4020 Youngfield St., Wheat Ridge, CO 80033 P: (303) 729-4354 WWW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC To-. Single Phase Inv erters for North Ame-rica so a rM $ E "4(00 QA-U%3,� SE 38(10A -U S J, A.1500 OA- US 14 S[f.01I - 1.1 0 S E �� f, �j 13 A- U:�, S E 1 ricioutA.- Ll S �-3 E 114 0 OA -LF, . . W N U Eiii6i�us ffiiiwi7iss mito"-1641 C) 0) cy) -0 W LL z — — CY) § -�6 >- -2 to a) U) C) AC F3w-r OL".1t 11:1 F0 Ccc, Izc U) 0 00 3: 1)>30 f JED ty, 201: �n.yj ;- FAm Ac P7Aer0Lt:)Jt 3iDl :�-"o E3fC I)nyj 24cv ACCAp.- vcnje: 'Ar.-Nerr M!- 123 - 1�3- A-- Fr!:.; -n:-; rf) i zc tc J=-7 -Lr-!*.7 �4 kA zos-,� L3 A !x nim D" �"v.nfls-cl T, 3 cf: 3 0 14crr. D'-- 75;! 2 W.':x %:,AC�rmn- 34.5 AC: K; 5 :Ct !-nt A!C77- _j n 3 2 7 ?-1 CEC' INTZ-el - F 10DIT Nal FE-7L,FES I -t -fn -e: -7.21 32 E:-- 5 It A K D A -R- I D -C-0 1, L I L 4 Gr VYS-,' -AT QN -PEC FIE.u'lONS 4.iAZ r,r 'nL-- r - :f D, it') -eirerr Lwi-c- -�2 4 3) 12 f "77 v x -:4 1z x 26C vn I r t �it-, ZzIr --W,-Xr L -L!, 3.: 4 CrV;r; -ttmb Far re., am0el ti F1 a ris -13 TC, +1-4. --�5 IC 45,- -4C t:. -ojC Frotec-tom Rbt�r; h Z7. 1A 3-. —pp.— -- smulf-lip -Pp— �jb Ngu- ;j— li� "#1 11:0 Iii—irt—i i Will: n rr—rrw— VMIAN M"t ?6:,W V.., It".2407 40�!, 06h: nw - US=K%L4i nTELLAR 401� I � ( 4020 Youngfield St., Wheat Ridge, CO 80033 P: (303) 729-4354 WWW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC DBM DESIGN DBM SOLAR DESIGN AND CONSULTINQ-QQMPANY, LLC E: PROJECTSCcD.DBMSOLAR.COM DATE V0,7 IR. ,J,17 017 PRCJrCT# 2017 -STELLAR SHEET NAME INVERTER SPEC SHEETS PArEt SPECS I 11V1110N 0 co co CD CD 0 00 0) 0 > . . W N < C) 0) cy) -0 W LL z — — CY) § -�6 >- LIJ to a) U) C) F- M C:) Lr) -C (-) (q U) 0 00 3: C) co DBM DESIGN DBM SOLAR DESIGN AND CONSULTINQ-QQMPANY, LLC E: PROJECTSCcD.DBMSOLAR.COM DATE V0,7 IR. ,J,17 017 PRCJrCT# 2017 -STELLAR SHEET NAME INVERTER SPEC SHEETS PArEt SPECS I 11V1110N 0 OPTIMIZER SPECSHEET solar =o*:. SolarEdge Power Optimizer Module Add -On For North America P300/ P320,'P370/ F400/ P405 PV power optimization at the module -level Up to 25% more tDrlegy Supe�ior efficicmv (99.5%) NJIVgates all types of module rnismitch lossu-s, froa�, manufacturing tolerance lo s)aMal shading Flexible s�stern de�ign for rnaximurn space -tiluation F:�st ins!aIlation l,%-th a Single bolt No.1 gerturar�on mainteriance with moduk -level morido! kig %ladule-level volt�ige shtitacwn for installem and fitt2fightet safetV STELLAR liar, ;� (- � 4020 Youngfield St., Wheat Ridge, CO 80033 P: (303) 729-4354 solar =se SolarEdge Power Optimizer WWW.ENERGY-CONTRACTORS.COM Module Add -On for North America CONFIDENTIAL - THESINFORMATION HEREIN CONTAINED HALL NOT BE P30C, / F`32(� I P370 P400 /P405- USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE P300 P3 0 P370 P400 P405 DISCLOSED IN WHOLE OR IN PART Ifor 60,tll �d- Jim hirh_P�er (tat highe�povf (fa, 72 & 96-mlt 11cr tnin 0it­ TO OTHERS OUTSIDE RECIPIENTS 60—rd 72-11 ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND INPUT USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN 613 s, �:5 AND CONSULTING COMPANY, LLC dt j ­'.'e' NIP,'T R- 8 NO kla�ilr�" shu-t Cl '_�a Crx!L., fl'o .13 1 i 0 i 1 Of I per -I % OUTPUT DURING CPERA-tON IPOWER OPTIMIZER CONINE[TELI TC OPIERATING SOLAKDGE INVUITEFIJ M-111 L' DLIjUl. 4;-: rll� j '�Lk M6-VLP 30.!U". AR6,ZO 0 0 UTPUT 0 UPI ING SrA NORY I POWE R OPT IM 9ZER 01 SCO N,4ECTE D FIR, 01A 5 Ot AP E DC; F I N V F RTE R 0 P SOLA R EDG E I NVE R7 E R Of F JL STANDARD COMPLiANCE Fl"C r rC F', I 11i cu-Xia-6-2. E Cz 1000 t 3 SLfv? � idi�,! I -IL17,: I fov's - 1"s-1- - - - -1.1 - I — INS7ALLF,7104 SPECIFICATIONS ------- JL CLI pl*�­ 'lld -ke' CD 0 2 A 35.� 1� .0/ 00 126, 152 7,5 IS 5.9 1 C� 6j (D 0 5, N 630 1 a.� 750 '.7 m.� 19 > %�C� � L� (1) < IM;,1 011 "eL(Ul roc,: i 2i 0) = 6 ��, ph�t �ul AH4 NK41 C -,.iv wtiLi of 8-0 0) Double I "lulited; 0 CY) C�) -0 W T,�,� V0, [:�>Ublt, h�lu: Jt"J; Mc'l cov wdnbl� ILL =3 2 F— Z _T_ U) A -0—M AH4 § -�6 >- 1�; � 39 LLJ L0 — U) CD Oor­,rrg Trmporaturp RnrgP 10 - SS 40 - E C: C:) Lr) IP68� Cl) 0 0c) 0 (0 PV SYSTEM DESIG N USfftG S114CLE PHASE A SOLAREDGE INVERTER""! HD -WAVE SINGLE PHASE THREE PHASE 208V TflREE PHASE 4180V 15 25 50 DBM DESIGN %1j'-lr.'U Puk%,l pef Sti, 57v2 15000,4-,!� 5 0 6wo 715 S1 .Ix j lie i S;Arle, of [101�,vn! DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECTS@DBMSOLAR.COM :2. WWW.DBMSOLAR.COM DESIGNE Vi. Perry DATE 07/17/2017 PlI.JECTOl 2017 -STELLAR SHEET NAME INVERTER SPEC SHEETS PAGE # SPECS � REVIIIIIN: 0 F- IRONRIDGE RACKING SPECSHEET FlUsh Mount System Su �t fr� z'ni:- '�' lei. qh;'- - r�-' lronRidge builds, thestil mounting symem for pitched r00f3 in 50111T. Every carnponent has been tested to 1he limil't and proven in extreme emriFonments. Our toorous approach has led to unique structural fentil such as curved iailsand reinforced flashings, and is also why our products are fully certified, ciDde comphant and backed by a 22AD-year warranty. Strength Tested All c*rnponents- evaluated im superior -structural porforrmnoe. Class A Fire Rating ance Certified to maintain the fire tesist, rating of the existing T0011. UL 2703 Listed Systern Entire system and comporients mr-at newest effective UL 2703 standard. L PE Certified Pre -stamp, -,d engine-efing lletters available in most states. Design Assistant Online software makez it simple to create, share, and price piojWs. 20- Year Warranty TvAce the protection off ef ed by competitars- X1Ft10 Rail A llow-profile m"ming rW for regiona with light snow. B'spanning C�*fibili?y Moderate load anpabifty Gis2r, & black anod. finish XR100 Rail XR1000 Rail The ullinivide resiclanfia] solar mourming rwl. 8- spanning capability Heavy �oad capability Clear & black. anod. finish UF03 Stopper Sleeves Univernall Famening Objemms Snan cm ft ILIFO to turm bond mr4cLiest to, rails. into a bonded end clump. Fully awernJ:i49d&k;bqd Sorm:lla nvDdules io, rails Single. universW size 6 diffe rem sizee Clew & black fnish Cow & black anod.fln4h FlashFoot2 Flash m-�d mount XA Pals with superior waterproofing. Twir-on Cap eases install Wind -driven rain iesied Mill &black firish Slotbod L -Feet :)zop�in design for rapid Tail attachment. Secure rail corefectiDna S�m for venical adjusting Clear & black anod. finiah Deagn Asaiistart Go from rough I%ADLa bo fully engineefed symarn. For free. A heavyweight mounting tail f*z oommwciw pirojews, 12'soanning capiabilily Extteme load capability Clear anodized finish Grounding Lugs qwipimen: ground Low profile Single wol insiall lation Mounts in any direction Bonding Hardware BaM and arzach XR Paili3 to certified atwhmerrtz. T & Square Boft optona 1*A uses 7.116' sockiei A3*en-d)W & itAxicated Bonded Sooes 't-� AN rails use internal splices for searnlese connections. Seff-drilling wtewa Varying versions for rails Foirre asoure bonding Mlicro,iinverter 10% - 4ft 7 Mount MIS or pos tD XP Rails. Boodis devices 10 rai "s Kit coffwz weembled UstedioUL2703 Flush Standoffs Paiee Flush Moum Symern Woika with vent flashing 4* and 7' lengths Ships assembled NABCEP Certified Training Earn ftee conlinuiN edu=ion crewdits, while learniqg more about our systems. 'V� Ir 1* -Ir;, ift. - , *'rvi " OTELLAR Wheat Ridge, CO 80033 P: (303) 729-4354 WWW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC 0 F- < U) 2 a) elf 0 LL z T- W F - (U) 0 C) .r- (1) C;5 0) CY) to M C:) a) .C -- Lr) 3: 00 6J N U) 2 W _2 U) 0 L) (D 0 C�6 DBM DESIGN DBM SOLAR DESIGN AND CONSU LLC E PROJ C01 BY DATE N,r3p7d,j 7 PROJECT 2017 -STELLAR SHEET NAME RACKING SPEC SHEETS PAGE* SPECS 71,110N: 0 RACKING SPECSHEET F - XR Rail Family The XR Rail Family otters the strength of a curved rail in three targeted sizes. Each size supports specific design loads, while minimizing material costs. Depending on your location, there is an XR Rail to match. XR10 XR100 XR10W XA 10 is a sleek. lowproffle mou" XR 100 is the ultimate residential XR I ODO is a heavyweight among rail. designed for regions with lighl or mounting rail. h supports a range of solar mounting rails. It's built to handle no snow. 11 achieves 6 foot spans. vAlle wind and snow conditions. %%tile also extreme climates and spans 12 feel or remaining light and economical- maximizing spans up to 8 feet. mire for commercial applications. 6' spanning capability 8'spanning capability 12* spanning capability Moderate load capability Heavy load capability Extreme load capability Clear anodized finish Clear & btwk anodized finish Clear aroodized finish Irriernal spilices available Inlemal splices available Irilemal splices avaab4e Rail Selection The following table was prepared in compliance with applicable engineering codes and standards. Values are based on the following cfneria: ASCE 7- 10, Root Zone 1, Exposure B, Root Slope of 7 to 27 degrees and Mean Building Height of 30 ft. Visit lronRidge.com for detailed span tables and certifications. T#71 50-70 160 80-90 160 L XR10 XA100 XR1000 Hughes, Daniel PIITCHED� F'OOF Grounding Diagram IRONRIDGE "TELLAR Wheat Ridge, CC 80033 P: (303) 729-4354 WWW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC 0 0 -- 120 None 140 160 100 120 10-20 140 160 CY) (70 100 30 160 100 40 0 P 00 a) 0 > 160 50-70 160 80-90 160 L XR10 XA100 XR1000 Hughes, Daniel PIITCHED� F'OOF Grounding Diagram IRONRIDGE "TELLAR Wheat Ridge, CC 80033 P: (303) 729-4354 WWW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC 0 0 -- 0 0 0 r--T IG 0 CY) (70 0 0 UFO Clamp Grounding Lug 0 P 00 a) 0 > N < < U) Fault Cu:*T-ent Ground Path Min 10 AWG Copper Wire 0 0) 00 W z U) >- Bonded Splice (Rail Conr,ectionj j W C CU to (D 52 0 M U) 0 C:) to 00 W Last updated by Chase Daily on 2017-07-17 14.32:17 -0700 Page 6 of 7 L4 DBM DESIGN DBM SOLAR DESIGN AND CONSULTING,COMPAINY, LLC E: PR=DBMSOLAR.COM SQLAR.COM , I 14;,Perry DATE: �07/17/2017 PROJECT 9 1,- 2017 -STELLAR SHEET NAME� RACKING SPEC SHEETS _j PAOE I SPECS I REV1111M 0 Hughes, Daniel -IT IL I i[L� P.00'r_ Side View (Portrait) RACKING SPECSHEET Front View (Portrait) �'; �,'ODULF RAIL FLASH�001`2 ROOF sul-EINC S's RLCTJF PV k �C EWLZ ItAk IRONRIDGE Side View f Landscape) .. 51e. '! � ! .8- e N*, ed " Al "3 epe . e '_ 0, in ep e5e 1 0"e me 4mb ei 0 e d -rd'. T w WW e'; a 1, e.f. h � 4 mtE5 N%at vow a d� mfl� e a ��Yft lei Last updated by Chase Daily on 2017-07-17 14:32:17 -07H Page 4 of 7 Hughes, Daniel co Cn IRONRIDGE ,ATCHEDIRCIC)� CD CD Splice Detail Co a) 0 L�j N < En < U) 0 CM 85 W z co LU 0 0 0 0 U) CD t CD In L) (P U) 0 Splice Connectior 0 co Vector Structural Engineering has reviewed the existing structure with I ading from the solar array and lag screw connections to the 0 existing framing. The design of the racking system, connections, and all other structure is by others. i:R'00 �YECTOR Clamp Detail n e I n E E R 8 65 7 W. GALENA PARK BLVD. S7C. I C 7 ­o,r (80 1) 990-1 775 OPAFER, LITAH 84020 vEcI.R.E. — L" "OVULL U"'rvc "s �A��TC41 OL 'JEC, C. , �'_ .' PY IJOC �` X LL F-LArdlz L J,'_�­ -------- --------- -- -------- PML �110 clal lip, P'atl I a C la r 7 1 p, F F of i -Id Clafl!p. Plat) Irldclarlip, Ftura FlashFocit2 Detail Last updated by Chase Daily on 2017-07-17 143217 -0700 Page 5 cf 7 STELLAR Wheat Ridge, CO 80033 P: (303) 729-4354 WWW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC N k-- r-% 1 1 11% -r- I I r-% A I t-1 k I I 8/18/2017 DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECTS@DBMSOLAR.COM WWW.DBMSOLAR.COM I DATE: PROJECT# I . -0, 2017-STF.LLAR SHEET NAME RACKING SPEC SHEETS PAGE # SPECS I REV111011: 0 co Cn CD CD 0 1-- Co a) 0 L�j N < En < U) 0 CM 85 W z co LU to U) CD t CD In L) (P U) 0 00 0 co DBM DESIGN DBM SOLAR DESIGN AND CONSULTING COMPANY, LLC E: PROJECTS@DBMSOLAR.COM WWW.DBMSOLAR.COM I DATE: PROJECT# I . -0, 2017-STF.LLAR SHEET NAME RACKING SPEC SHEETS PAGE # SPECS I REV111011: 0 RACKING SPECSHEET 11 "TELLAR lar, -1. (:1114TRAJORS lr�onRidg ,e kfarch [4, 20,16 Mr. David F'. Taiwan Page 20 of 20 4020 Youngfield St., fronRid i Wheat Ridge, CO 80033 X11106 Rail, R(.vf Flush Moundrig System - StrUettiral Analysis Starling Mudi:5on Lofquist, Inc. i P: (303) 729-4354 sm_ WWW.ENERGY-CONTRACTORS.COM CONFIDENTIAL - THE INFORMATION 5224 South 39* Street, Phoenix, Arizona 85040 Notes - -tabulated values are basoc! on [he fol I owing criteria: HEREIN CONTAINED SHALL NOT BE tel: (602) 438-2500 tax: (602) A38-2505 RCC*291316 www-soviler"g-com I Building mmi roof hei ht - 30 ft i USED FOR THE BENEFIT OF ANYONE EXCEPT STELLER ENERGY Category i Risk CONTRACTORS NOR SHALL IT BE DISCLOSED IN WHOLE OR �N PART -3. SoLar maximuni module long dimension is 67.5 inches, for Tables t A -9A. and 78 �5 inchts for TO OTHERS OUTSIDE REC PIENTS lronRidpe March 14, 2016 Tables. I B -91B. ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND 1495 Zepfivr Ave Paee I of 20 4. Provide 2 in- c I car ktwcen roof and rail USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN I laN %ard, CA 94,544 5- End cantilever 5pn (max) = 0.40 x mnximurn span (Ln.) fh)m above tabies. Sec'Figure A PERMISSION OF DBM SOLAR DESIGN 6. No rail splice,,. in outer'_113 of cnd spains. or the middle P3 of interior spami based on the AND CONSULTING COMPANY, LLC - installed actachment spacing See Figure A Attn_ Mr. Da% id F.1 algpa, VJLC President Products 7. Singk simple span(s). Spans IiI.Led in the ishles above may be multipliedby 1-09 for continuous rails of3 or more spans. Subject: It orillidge XR 100 Rai I. RoofFlush Mount I tip- System - Stfuctural Aivaiv sis N. Module Mounting Mid Clamps shall not t*. iiisialled lc%.% than 20 inchcs from Roof Zone 3 where %ind slwcds am marked with an 0 in -tables 313 and 613. Deat Sic find Sven Interior splin F -MI Span We have analvzed the fronRidge XR100 Rail for t1w -wbject -iolar module sulnu"t sysitem avid determcned that, for the conrigurationi and criteria described helow, it is if) Compliance vi.Ith tile applicable sections oi'the follovk ing Red&enee Ek-wunients". 0.4 L, L_. TYP 113 L..., TYP Codes: ASCEISE11 7-10 Min. lkskgn Loads t4r Buildings & (Mber Structures TI'Wkirc A L_ Maximum attachment spacing provided in the tables above fbr the project deiign criteria International Building Code 2015 Edition co C:) Internatimial Residential Code 2015 Edition L_. Actual installed attachment spacing C:) Otlief: AC418, Accepunce Criteria fig, Modular Harning S% stein i I J_wd it) Suppxwt I1,V 0 00 6i W a) 0 Indic.atcs region of the rad Aliere splice inay Lv insml!ed P: > N Modules� dated 1:11ective November 1. 201-1 1)) 1�611S < :E U) < Alurruntun Desiv gn Manual. 210 15 Edition Our analysis asswries fliat the rails, including the. connections and aswctated hardware, are ijisWled 0� 0 0) 1)0 W in a workmarilike, niannei in accordance with the "lr4ynRidgc Flush Mount Installation Manuc-d" by LL = F - The lronRidgze XR100 Rail is an extruded alwninum section �%jth an oveyall delAh of -2,43H in- and a Z Z: U) :-�. net area of 0.583 sq.in. Tlw rails are used to suppcin solai nuuJules, typicalk, oti the rix)rof a TronRidge and gencralk accepted stwidards of construction praciiec, Additional information is — — CU >- Se LLj A) L0 (1) C0 buildike. &ee F�­.hibfl (X)l I- all-aclied. T1w mMules are clamped to Iiie rail,'; In the IfonRidpe available al the 11170nRidge web site, lion.12,idge-coin. Verification of PV Module capacity to support F- C:) 0 the loads as.,4mmiled with the given am, y shall be the respoijsibjlit,�, of the Contra-vtorCIT OW-nCr and L0 L) (9 Module Mowiting Clamps. as shown in the ailaefted L.dubit. lilte tails are attached io the L-FIL1101 _& 0c) CD alwiiiinurn akale hrackets'diat afe either attaclied d.trecily to the toof frainkap of attached to a stand not lronRl e or Sturling Madison Lofquist, that is stro%ed to tlw roof framing -the fails are mounted aLross. the ilope wjth a sinall clearance C, The adequacy of the supporting rool-framing is to K� determined by others. iflus;h inourmng,� to the underb, ing roof structure- The insialled -,A)Iar modules we at the s&tne slope 0-* as the urider1% ingroof su'ucture. Plea%e feet free to contactme at your convenience ifvL)u have any questions. 4 Alt k3ads are tratNlfeired to the rot-iffiarning, thfough the ample brackets bv simple hii-amal flexure of 40 81 DBM DESIGN the rails. The rnaxiinuni span of the tails I--. Lo% erned by either tile nud-span flexural stre.,Lses Or the Respectful1v yours, 3 J I deflection requiferrient that the rail riot come i4jjo cukiitacj�ujth the joac. DBM SOLAR DESIGN AND CONSULTIP�C,,OMPANY, LLC E: PR @_8Mk0LAR.COM -the effect of seisinic Ithads; (foi all deiip ,ni cateportei A -F 0 have been deterinined (to tk- less than the ;4W.DETOLA �.OM elli2ct due to wirid Immis in all koad conditiorts and corribinations. Thererore, the inaxinium allowable Tres Warner. P.F, DEStED BY: - in the tables helo". Table.; IA -9A are for modules with a Whej IL — spans t6r coninton load cases are shc , Perry rni%imurn lone dirrienston of'67.5 inches and Tables I R -9B are fim modules %kith a nimornum lon2 Design Division Manager DA Ila dimension of 78.5 inches- 1147d I - 201 IJ Stasling Nfiedison LofiluisE, Inc, Gansulting Stirticitaral and F4irrn-.9i(.- Fnginer.rS PRojEc 2D4Z-.S_TZ-tLAR Surling NtAdiiaoA 11-Aliquist, Inc. Cnmultin,� StructurAl and Fairemic Edginctra -20- SHEET WME: RACKING SPEC SHEETS PAGE # SPECS I III 11110N. 0 i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: M ) D Job Address: 25C6, W -?6177Y A VK Permit Number: 2�) "]o Z� S ❑ No one available for inspection: Time ` AM/ I�V Re -Inspection required: Yes (V_ *When correction have been made, call for re -inspection at 303-234-5933 Via! e; ; Ins ecto�� DO NOT REMOVE THIS NOTICE City of Wheat Ridge �r Residential Roofing PERMIT - 201703275 PERMIT NO: 201703275 ISSUED: 07/05/2017 JOB ADDRESS: 8505 W 38th AVE EXPIRES: 07/05/2018 JOB DESCRIPTION: Residential Re -roof to install asphalt composition shingles - 27 sq. *** CONTACTS *** OWNER (303)979-5737 HUGHES DANIEL SUB (720)746-1661 Jerry Hughes 090190 Stellar Energy Contractors *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 11,000.00 FEES Total Valuation 0.00 Use Tax 231.00 Permit Fee 220.15 ** TOTAL ** 451.15 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201703275 PERMIT NO: 201703275 ISSUED: 07/05/2017 JOB ADDRESS: 8505 W 38th AVE EXPIRES: 07/05/2018 JOB DESCRIPTION: Residential Re -roof to install asphalt composition shingles - 27 sq. I, b myy signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perforin the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or('CONTRACTOR (Circle one) Date I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2• This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4, No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any applicable cog any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line. Kimberly Cook Zo(70 3 2 From: no-reply@ci.wheatridge.co.us c — Sent: Thursday, June 22, 2017 11:32 AM To: Permits CommDev c -q Subject: Online Form Submittal: Residential Roofing Permit Application 1 For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. 1 Is this application for a Yes VlG e`Y�°'r�'d 711117 residential roof?`I ti ns tv " 71V17,,, -,- How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email Address 8505 W. 38th Ave Daniel Hughes 303-979-5737 aysfaninside@msn.com Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed C� contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received. YOU WILL BE CONTACTED WHEN YOUR PERMIT J IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. Permits are currently being O processed within 5 business days, subject to change based on volume. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. 1 Is this application for a Yes VlG e`Y�°'r�'d 711117 residential roof?`I ti ns tv " 71V17,,, -,- How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email Address 8505 W. 38th Ave Daniel Hughes 303-979-5737 aysfaninside@msn.com Do you have a signed Yes contract to reroof this property? It will need to be provided at the time of permit pick-up. CONTRACTOR INFORMATION Contractor Name Contractor's License Number (for the City of Wheat Ridge) Contractor Phone Number Stellar Energy Contractors 090190 720-746-1661 Contractor Email Address office@energycontractors.com Retype Contractor Email office@energycontractors.com Address DESCRIPTION OF WORK Are you re -decking the No roof? Description of Roofing Composition shingles Material Select Type of Material: Asphalt If "Other" is selected Field not completed. above, describe here: How many squares of the 27 material selected above? Does any portion of the No property include a flat roof? If yes, how many squares Field not completed. on the flat roof? TOTAL SQUARES of all 27 / roofing material for this project 2 Provide additional detail 5/12 pitch here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract (1!1000 value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant Dawn Bargas Email not displaying correctly? View it in your browser. 3 www.energycontractors.com 4020 Youngfield St, Wheat Ridge, CO 80033 Office: 720-746-3.66:L Fax: 720-897-2832 Agreement Client Name: Daniel Hughes Phone: 303-979-5737 Project Address: 85oS W 381h Ave Other Phone: City, State, Zip: Wheat Ridge, CO 80033 Client Email: aysfansinside@msn.com Specialist: Micah Maberry Preferred Communication Method: Specialist Phone: 303-495-4312 Referred By: Specialist Email: mica hmaberry@ener contractors.com Date: 5/18/2017 THIS PROPOSAL ("Proposal") is by and between Stellar Energy Contractors, Inc. ("Contractor") and the above client ("Client"). These provisions have been designed to facilitate proper communication between the Contractor and the Client. If you have any questions, please ask your energy specialist to explain. This Proposal (including appendices), along with the installation agreement ("Agreement") constitutes the entire contract between the parties regarding the Work ("Work"). Proposal pricing is valid for thirty (3o) days. i. Specifications (Roofing): We will always provide new colored flashing/rake edge, use upgraded underlayment, starter strip on all rake/drip edges, apply ice/water shield to all eaves/ valleys/ rakes, and apply 6 nails per shingle. These "upgrades" will extend your roof life, reduce damage to your wood trim, prevent wind damage and look better. We think that they should be required in the code and we would do them on our houses. WE DO ROOFS RIGHT! Measurements Field Area: 2407' Ridge: 76' tarter/ Eaves: 133' Pitch: S/22 Hip: o' Valley: 44' Rake:182' Stories: z Flashing: 39' Step Flashing: 65' REMOVE ❑ i Layer of Composition Shingles ❑ 2 Layers of Composition Shingles ❑ 3 Layers of Composition Shingles ❑ Wood Shingles ❑ Wood Shingles + 1 Layer of Comp. Shingles INSTALL ❑ 1/2" CDX Plywood ❑ 7/16" O.S.B. ❑ Underlayment_3olb ❑ Ice & Water Shield ❑ 2" x 2" drip edge/rake metal ❑ 2" x 4" drip edge for eaves ❑ 2-1/2" x 2" D/L style drip edge baked enamel ❑ Open Valley System ❑ Closed Valley System ❑ 2" w/ Valley Flashing ❑ Matching Ridge Caps ❑ Chimney Flashing (seal and paint to match roof.) ❑ Roof to Wall Flashing (seal and paint to match roof) ❑ Skylights Step Flashing ❑ Cricket behind chimney to divert water ❑ Ridge vent 4o L. F. ❑ Aluminum Turbine (baked enamel) ❑ Roof Vents # 4 ❑ Soffit Vents # (for proper attic ventilation) ❑ 3 in 1 pipe jacks ❑ 4" heater vent caps ❑ _s _6" heater vent caps C)8" heater vent caps ❑ 6" roof jacks MEMO ❑ Promptly remove debris from job daily ❑ Sweep yard with magnet ❑ Utilize house protection package ❑ Protect landscaping as much as possible ❑ Roof deck replacement is not included and will only be added if required and with Client approval at s1.56 sq. ft. (approx. s5o per 4x8 sheet Proposed Selected Roof Type Color Price Option:L 1 Owens Corning Driftwood $3.1,475 5" Gutters/Gutter Covers Aluminum $1,394 2. Specifications (Solar): Panel Mfg; Canadian Solar Size: 6.6 KW Number of Panels: 24 Service upgrade: No Inverter Qty:1 Monitorin : YES Inverter Mfg: Solar Ede Total: $27,89o.43 Rackin Mfq: Iron -Ridge www.energycontractors.com 4020 Youngfield St, Wheat Ridge, CO 8o033 Office: 720-746-1661 Fax: 720-897-2832 The system includes all miscellaneous labor and material, including racking/ racking hardware, conduit, wire, collector boxes, hangers, etc. Delivery, Inspections, and utility processing is included. Building, lot documentation, and electrical documentation as required byjurisdiction is included. Structural engineering to satisfy Municipality Building Department requirements is included. Unless otherwise stated, the terms of this proposal does not include modification, reinforcement, or alteration of structural members or system. Should it be determined that modification, reinforcement, or alterations are required by a structural engineer, Contractor will inform Client of the cost of these requirements prior to commencing work. As every jurisdiction is different, permit cost is not included and will be added to proposal when known. Anticipated completion time is 8-12 weeks, but is dependent upon utility, weather, material availability, client availability, engineering, permitting, and building department/ utility inspections. 3. Notes/ Special Instructions. HVAC *Replace A/C, Coil, and Furnace with 16 SEER Carrier Unit with matching Coil, and replace Furnace with Variable Speed, Infinity Carrier Furnace. Touch Screen infinity t -stat included, along with all labor, materials, and permits. A MERV 4 Filter is Included as well. Total: $11,429 *Add AirScape3.2 Whole House Fan, along with added ridge vent for ventilation to the attic. Total: $3,375 Attic: * Attic Air seating & Insulation Prep: Seal all those leaks hidden under your insulation to make your home more comfortable and energy efficient - including wall top plates, electrical and plumbing penetrations, and any bypasses and chases. This is an important step as it stops a significant amount of air leaking out of your home that insulation alone will not stop! Additionally, prep the attic space before adding insulation: install air channels forsoffit vents, insulate fan ductwork, install plywood dam around hatch, weather-strip and insulate hatch. * R -6o Attic insulation: After air sealing and prep is complete, insulate any vertical walls with additional blanket of R-19 air barrier insulation, and insulate all flat portions to R -6o with high quality formaldehyde free Owens Corning short fiberfiberglass (performs much better than traditional long fiber insulation) insulation. Total: $2,805 4. Payment Terms and Loan Information. Contractor proposes to complete project in accordance with above specifications, for the sum of: $59,585.43 Cash Down Payment...............................$g,000 12 years Qa 2.99% Sum and Payment ...... $38,705.43 @ $321/month 12 Month Deferred Interest .....................$11,880 These payment terms reference payment due dates, in addition Client should review "Terms" section of Installation Agreement. 5. Roofing Project Declarations (also stated in Installation Agreement). Pursuant to Colorado Statute S1338- Colorado's Consumer Protection/ Residential Roofing Bill, Contractor cannot pay, waive, rebate, or promise to pay, waive, or rebate all or part of any insurance deductible applicable to the insurance claim for payment for roofing work on your property. Contractor shall hold intrust any roofing payment/ deposit received until roofing materials have been delivered to the jobsite. Certificate of Insurance identifying Contractor's insurance carrier and the types and amounts of coverage and our insurance contact information is attached or will be provided to Client and is incorporated herein by reference and should be considered part of this Agreement. Client may cancel this Agreement/ Proposal at any time prior to midnight of the third business day (Sundays and Holidays excluded) after the date of this transaction by sending a signed and dated written Notice of Cancellation by registered or certified mail, return receipt requested to 4020 Youngfield St. Wheat Ridge, CO 80033. Upon receipt of such Notice of Cancellation, Client is entitled to a full refund of a ny Pre -Payment (subject to custom and special orders) that was made under this Agreement and Proposal. If Client plans to use the proceeds from a property and casualty insurance policy to pay forthe roofing work, client may cancel this Agreement/ Proposal after receiving written notice from the property and casualty insurer that the claim has been denied in whole or in part (subject to the same conditions and timeline above). www.energycontractors.com 4020 Youngfield St, Wheat Ridge, CO 80033 Office: 720-746-1661 Fax: 72o-897-2832 6. Acceptance of Proposal. The prices, specifications, and conditions are satisfactory and are hereby accepted. Signatures Client: Name Daniel Hughes Date of Acceptance: 06/05/17 Signature ARIW yuyhet Stellar Energy Contractors: Name Micah Maberry Date: 1 5/31/2017 Signature 7n�� COMMUNITY DEVELOPMENT DEPARTMENT Building Permit Number : 77116 BUILDING INSPECTION LINE -(303-234-5933) Date : 5/21/2004 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80033 - (303-235-2855) Property Owner: MRS. AUDREY CARNEGIE Property Address : 8505 W 38TH AVE Contractor License No. : 21964 Phone : 467-0509 Company : THD At-Home Services, Inc. Phone :(770) 779-1423 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agreedo abide by all conditions printed on this application, and that I assumefull responsibility for compliance with the Wheat Ridge Building Code (U.B.C.) and all other applicable heat Ridge ordinanc for work under this ermit (OWNER)(CONTRACTOR)SIGNE~~ DAT~ Description : VINYL REPLACEMENT SIDING Construction Value : $15,597.00 Permit Fee : $344.90 Plan Review Fee : $0.00 Use Tax : $187.16 Total: $532.06 Use : BUILDING DEPARTMENT USE ONLY SIC : Sq. Ft. : 2oni ng,Corrmme~r~ts; j Approval : Zoning : Bu~Idin,g,Comments i Approval : Puti il c, o~s~',~Gor~ments,;;3 Approval : Occupancy : Walls : Roof : Stories : Residential Units : Electrical License No : Company: Plumbing License No : Company : Mechanical License No : Company : Expiration Date : Approval : Expiration Date : Approval: Expiration Date : Approval : (7) This permit was issued in accordance with the provisions set foM1h in yopur application and is subject to the laws of the State of Colorado and to the Zoning Regulations and Building Code of Wheat Ridge, Colorado or any olher applicable ordinances of the Ciry. (2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building authorized is suspended or . abandoned for a period of 120 days. (3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be made in the original plans and specifcations and any suspension or abandonment has not exceeded one (1) year. if changes are made or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit. (4) No work of any manner shall be done lhat will change the natural flow of water causing a drainage problem. . (5) Contractor shall notify the Building Inspector lwenty-four (24) hours in advance for all inspections and shali receive written approval on inspection card before proceediing with successive phases of the job. (6) The issuance of a permit or ihe approval of drawings and specifcations shall nol be constmed to be a permit for, nor an approval of, any violation of the provisions of in g cod any othe ~ ance, law, rule or regulation. MIN f uil g Insp cto C Please sign Terms and Conditions on reverse side of page. ~ N E o Z E a ~ a m O 9z W m ~ Cy N ~ Q N M ~ o°Luz"' ~ O = W 0: Q - z ~JQHo azwrno OOxN.co jULLyU ~aO~ui N~o(D Z~U~K Z ~ W Um ~pGE e ~ o W Q ~ o 3 ~o 0 ~11 J ~ N Sz~ 4 m a ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ U 0 z F ~ ~ 0 ~ O V O ~ Ln 69 69 69 ~ ~ wwHF ~ 0 . 0 a U ~OC~pO~ T o V ~ d - a m~aaa ~ ra ~ m c m - n`omooy Edm°~s €o~~v2 o NrD(6N10 r oaE.. TNN~yU 1] Nw NRJ 2 owm a°i~'- =F ~ N . L r N n~U'_L°oa ocsA•-Vy N " N " C Ms ` w ~c c° c 9 a O U E N U m Y N 2-NN0~O d ~ N lO ' 10cE~c~ yO~py $>cco o>.°- dc AC O`~D.L.~- ~0 UmyLO ~.v o m c =0 ~ ~ rn~ a 3 rn v~ a m U ~ C N UD ~ o m ~ ~mKmc«=~p ~m3'v°m d U L O C E L L U t O O> - 10 ~ N U U > ~ Vo ~F-- W ~ ~ ~ r C 9O a a o `v u d ~ N LL Q ~ r C = U ~ U) C U1 ~ ~ F~ ~ z o ~ a _ Q o 0 z Q ~ N ~ ~ H w y . r = ~ _ U Z > ~ W O G w > 2 O > vi O ~aN 0a ffa ~ c°~a 3a m U' ? U C- 2 ~ m V U O m a O O Z N N C V J U C C cc N d ~U O Z N' h (D U J m~ C E n D Q a O Z d N C (D J T U lcp ~ n U ~ q? O WU N m 0 O 'n W N N ~ 0 a W N m ~ c O m .a W O O ~ N N..: C C C 0 C"- N N y N :p OI O € ~ ~ U J ~ N n 3 C C L N C r O N d > ~ 5'o c oc ~ o° m y ~ d € c 3 0 9 O~ - N 0 ~ ° > c-oEm aA ~ y O N~ y y W_ dd ry 6L6~~ ypi sa ~ 9_doc a~ p O y L N U C y N O N- :o o ~E ~OO w 5° ~2 2 N C O T C d~ N y 3 N(0 N ~ w O y 0~ v`o i. € m- m c ~ c o m ma ° v~ d~ O p ~ j.0 jm O O C m ~ ~u~ d C'_ ON`. U ~ 'QU T 0 C N r O N m C ~ N O~i N= O rJ O N« N p C O T~ ; L m m; ~ d ~ c L a ~ o S ? L~ m 00 E A0 0 0 N O N N'O a w N E o y U N mo UN~'c-oo$~~ma o U Z p o a~ d° y m? p C .oa ovamm rw'3n ~ O N 6 7 N C o10m ~ ~v c3T a 9i00 i 3 m ~ n d m d m u c Q L p ~ > O N o ~ N N c~ N C a d 0 a ooEo) 0 c- np m1° 3a;..o'_v°cvmn E rn d m€ v° m v~ d y $ M a5 y-'3a=f. E,E cadh$~€o ~ N X N y 0~n ~ O~j d O a$ d y.aam~ c & °T m° 10vix3m~`~c°~ N N.C ~ N 3 C N 2-00 ~ O ~ 6 0 O~ O ~ ro ~ 75 ~ UL TJ' N> T 3 C d W6 c o m t~~ m ~ o o n c a FU~F-N=L...ZU NF m 5 ~U 0 m c a m r ~ K a Z r u 8 u ° $ u = = LL i o S ~ °o N °c ° o~ ah ~ z e ~ a o a o ~ E ~ ~n y a ~Q " W U < o Y e < g o ~ ~ a o r°w N o = N ~ 0 ~n U m ¢ w w a ❑ ❑ T ❑ w ~ 0 ~ Z Z ~ W o ` ` a ~ O 3 ~ - 3 O 2 O Q u = O Q a U ❑ o LL ❑ . J I❑ I I I I W w la ~ 0 z ~ o - N U ~ W N ~ ❑ ~ 0 0 [ . w u Y ' _ C w 7 Y r U o I❑ G r z ~ = Z J p r „ a' El > O L a ~ = O a O w N ! Q Y % 2 Q ~ J W . N U) C_Z7 N 0 ❑ I~ ~ O N \ I 0 m ❑ c t z ~ o , ~ z ~ i o W V a t Q ~ N O o ~ o LL N Q U ~ m C a ~ r > a W f ~ N = lo MI W Z W w rn = N M m W 0 W ~ Y p~ U ~ ~ Z 3 0 U ~ W ~ a 2 UC N W ¢ m ~ O OQ ~ u J ~ N 5 y D ~ z m w =w ~ j W J r=- z oQ w O ~ I O N ~ ¢a 00 = N F Y W Q N ~ W K y 0 lk 'h ~ 0 ~ U F Q w a ~ O m ~ lll a ~ \ W ai ¢ H z U ~ ❑ m w a ¢ y a ? y LL ? O W W o F- W j W Z ~a N r N N ~ Q W 2 Q 2 00 O ~ Q 6f I Z z x t- ~ , f ~ m= N N ? a z ~ J S Y r ~ aa O p LL a 0 a N Z 0 F N S ~ N Z I O Y F ¢ W Q a ~ N Z W ¢ 2L ° r ~ N U ! S' W LL J o ~ W Z Q (S w ~ Z F 2 m Q ~ ~ p O ¢ J a i aoQ 0~~ m LL w Z~a a x Lw w r ~ J a~ J U~ m H a a3w aoa a U J a ~ 0 0 f H ~ w J ~ Z \ 7 l ~ N ~ t ~ ~ g v ~ ~ a o C R' ~ Q W rn lb O 3 a y l Z ci ~ m w I m J z d ~ r u w ¢ (n ¢ J ~ J 0 Q = W ? F f ~ ~ 2 ~ Q U m 1-- K V' 3 Q N LL N Q Q Q W Y Z Q O 3 = ~ Q W W W F J J LL ~i Q 3 m S N N Q t~ '2 Q n t ¢ O O M- J a " ~ ¢ H w w <n cr LyJ. m t/1 2 N d W N R H ~ a w N w 2 a f ? N 8 a' = 0u w ~ J y F ~ U O co RS 3 ~ a S U Z U ~ V w c~ N ~ ~ w J o _ ¢ K W Z } V Z 0 ~ W U Z W ~ Q > N y 2 y O ¢ O J V ~ O tWli WU' ? Z ¢ ~ R 'u N 0 R W J ~ 3 a = 0 a 3 J ~ ~ x ¢ = a o ° o F w ~ w 2 = U J w = g ~ I~ 3 N o Q f Q z N ~ 3 Q g ~ ` D "D d c ~ P ~ ~ - ~ IF, 3 W ~ W W X ~ Q I Q w cwn O LLI a 7 F- U n NU Z y Xj0 W O f- Q U vZLLJ ~ N w n ¢ ? N Q O J=O U ~ n o ° ; o ` a °u E n' m~, o a o- m~^ E o m o 3 n c p - o ¢ .o ~ ~ ~ a c« Ef O m ~ 0 o m o f O ~ y O~'+ L~ O m c° o a° o O r L> O O, m O C u~ ~ t c CJ Y 4 ~ _ o 000000~~0 Y+ w p 3'C-C O C0 O m_ o c o N 0 0 o r L~ c' o e a o E ~ o°o U'> E 0 ~ ~ ~ ~ ~ ~ 0 ~ M N m 0 V N u m a 0 d a° n ~ w ~ w~ 'ao = U m W N ~o w~ 3a o W O > m ° a m c E C T U v vro U N .G G N bl N C N u .u CO A ~ ~j E r a - ~ u 'O 'o N r-i E o v ~ ~ o s+ G w o H m v w H o w CO as o 44 (0 • o N (0 r-i ~A o w ~ O O w tn C ,.C G w r.4 4J r6 ~ a row o m o a 4-) Co Cn Q) s4 a~ u W r v~, a) u u H o ro v u s4 rt> ,j a ro u u u • ~ ::1 1-+ o u, u ro ~-_i Fi u o -,-j Q) ro ro w r rn s4 m o4 E ~ ::5 ~ rt ~ ~5 v o 0 . 4-) Oi R, N ~ u) N A G U (1) ~ ~ >r N (d - -i Ri 1.1 . 1.~ U) 10. G' .U - S4 v > N ~4 ~ ~ ~ ~ oro H cn li v ra m (1 o a rn ro u o a u a u G a) ,j < v r ~l u v ro ,1 rorn o o ro a o u u rn ~ H >1 s+ N C~G u 41 ~ u u • ro u ~ ro o ro -H a r-i s-A co 'i .c m o~ u a v o w ~l ro 41 li ~ G ro Ij ~ ~ N ~ 'd O A° O N N O i~ r-I C m -rl 41 O . ~ ~a . N C Nr-i ~ A ul R, O .u G ~ u ~ ~ .u C O 3~l ~H G N G u X cn U -H ~ v rn + -,-1 (1) o a ~ o m o •o v a) ro ~ E > w Cn -H w (0 r~ u S~ u C a) 3: w E ~ o FC - o> .11. N • rt ~j N C v w 3A N N N vi b> ~Sll C O N .u -C! F+ N Sa N w N N.&,' 'd U uJ O U A 41 +-J O S+ O 'H 00 0 rl 41 41 U] ri ri ~4 4-1 \ Ji co C 31 . . M Pa W Nr, N P'. N 41 [q N ri O O O 'd ro r N 1J S. N w ri R, U O ~ cL ~ C C N A 'H .U P.' rl r6 ~ N O a~ ~ 7 N }a .t-) r0 N b O r-i ,S," U) O A ~ c6 U 'n N S'-. 4-4 t~ N -rl fl U N N ~4 J-j N U r'1 N U O \ trl Ip 'r1 CJl 1-3 Aj "ri ~ f0 ~ b1 JJ ~ N~4 N 'r1 'cl 0 }i N N r1 t0 N U UJ ro r, ~l ro> ro r, u a rn ~ m rn H e v ~3 r ~ O O (6 3 O co w (6 ?4 _0 r6 A N N N 0 b~ U 7+ ~.ci ~a w w O a) G ~ C G -H - 'd CL v 'd W 5 O rt3 m 04 O .C .,1 10 N m u] ul u7 C ,-i -H sj ~ E G u v v v u ro E ro G ~ a~ rt w w m Q O rou~Q v rn o v s+ 0 G 0 s4 ro o -rl .11 O rl N -C~ rt 1j N 4 '0 N 10 R, C0 'LS U tn • . m 5. H m . w 04 'r, N +j C -H U 0 '0 O ul O a7 r, *H N N N 1) c~ -,1 N O r O U~ .1i U -li w rO N N 'O N S+ V rd A 0 _0 - O .u -.i o -ri G N110 w N w N N R, N S~ H N A ~ q c6 Ul m 0 CL N O N ~ ,-a > C E > N C ~ -i N N m ul -11 S-i O •H H 27 1j O O -a 0 Ol Q, O (d ~ ~ TS - ul U N O ul 'd O -W '-d LL C 4J S-i S-i- ~4 t11 ~A .L,' N rl -H G N a~ o > ro w ~ ~ u (1) o ro (1) a ro v u, ~ m ~ ro o ro m u, ~:jo (D u ~ a rn a > o ,j w . U Ul C O ul H N C • ~ ul A O r6 'O r6 r0 . N O C N rC .1i rn IC4 p o a ~i m (D 41 v G u o u v q Q ~ v w o IJ rn rn H .-i ~ m rn .ci M 0 ~:5 a ro s4 v a H (1) E 0 ,0 L o r ~ v x .Ci o w > 5-1 u (1) a v-li u o a) ro ~ .Q -H 115 ~111 v u m ~ -H ro ,W M v o ~ 4J ow,J s4 > o u ro ~ u > ~j ro m sA (a N ~j o . N 3- • U N U m C14 O O -H +1 '(i ~ N O ~ .u m N U O O N ~ 'd LL N k N ~4 ~J C- N fl, ul .111 G }-l a~ ul N. r~ u) i-i O 04 S-t }-i 0 N R, E O ~ -li r--i .U O il4 a~ C M C .U .V ~ m N N U FC N 0 41 U S'-, R, 47 44 ri N S-i E N O N O U U u1 0 4-) ~ N m N > m H ~ H W 3 E FC 3 r-i R, N U . 3 U r6 S-i • UJ ri -li C • ~tl ~ l4 O C N . ~tl Sj ~ ~J N A 0 r~, ~ ~ U N U1 U1 N U J-j ~-I N M a' e c 0 U > s CJ Mr. Michael Chessnoe, P.E. Chessnoe & Assoc. Page 2 5. Upon completion of the drainage improvements the engineer, Mr. Michael Chessnoe, P.E. shall provide to the City of Wheat Ridge a letter of certification stating that the various improvements, as defined in the drainage report and plan, have been accurately surveyed to confirm that their construction is in accordance with these documents. The certification letter shall be written and stamped by the engineer who prepared the drainage report, and shall be submitted for review and approval by the City prior to issuance of the Temporary Certificate of Occupancy, or Certificate of Occupancy. f ve any questions, please contact me at 235-2868. , FIl-y on, M.P.A. Greg Knuds Development Review Engineer GWK cc: Bob Goebel, Public Works Director Alan White, Planning & Development Director Dave Kotecki, Sr. Project Engineer Steve Nguyen, Traffic Engineer John Eckert, Chief Building Inspector Meredith Reckert, Senior Planner John McGuire, City Surveyor File