Loading...
HomeMy WebLinkAbout3260 Fenton StreetO PERM IT:�XIK W��KAD DRESS: ,% 1 �_- JOB CODE:d/ Rough Inspection (continued) Date Inspector Initials Comments 316 Rough Mechanical Residential 317 Rough Mechanical Commercial 318 Boiler / Furnace 319 Hot water tank 320 Drywall screw and Nail 321 Moisture board / shower walls 322 Rough Grading 323 Miscellaneous _ j - 9 `7 Final Inspections Date Inspector Initials Comments 402 Gas Meter Release 403 Final Electrical Residential 404 Final Electrical Commercial 405 Final Mechanical Residential 406 Final Mechanical Commercial 407 Final Plumbing Residential 408 Final Plumbing Commercial 409 Final Roof _ j - 9 `7 410 Final Window/Door 411 Landscape/Park/Planning* Inspections from these entities shall be requested one week in advance. *For landscaping and parking inspections please call 303-235-2846 **For ROW and drainage inspections please call 303-235-2861 ***For fire inspections please contact the Fire Protection District for your project. 412 Row/Drainage/Public Works** 413 Flood plain Inspection** 414 Fire Insp. / Fire Protection*** 415 Public Works Final** 416 Storm Water Mgmt.** 417 Zoning Final Inspection* 418 Building Final Inspection Note: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not constitute authorization of occupancy. For Low Voltage permits please be sure that rough inspections are completed by the Fire District and Electrical low voltage by the Building Division. INSPECTION RECORD Inspection online form: http://www.ci.wheatridge.co.us/inspection Cancellations must be submitted via the online form before 8 a.m. the day of the inspection Inspections will not be performed unless this card is posted on the project site Request an inspection before MIDNIGHT (11:59 PM) to receive an inspection the following business day, PERMIT: ADDRESS: JOB CODE: Foundation Inspections Date Inspector Initials Comments 102 Caissons / Piers 103 Footing / P.E. Letter 104 Foundation Setback Cert. 105 Stem Walls 106 Foundation wall Insulation Do Not Pour Concrete Prior To Approval Of The Above Inspections Underground / Slab Inspections Date Inspector Initials Comments 201 Electrical / Cable/ Conduit 202 Sewer Underground Int. 203 Sewer Underground Ext. 204 Plumbing Underground Int. 205 Plumbing Underground Ext. 206 Water Underground Do Not Cover Underground or Below / In -Slab Work Prior To Approval Of The Above Inspections Rough Inspection Date Inspector Initials Comments 301 Rough Framing 302 Wall Sheathing 303 Roof Sheathing 304 Sheer Inspection 305 Insulation 306 Mid -Roof 307 Metal / Lath / Stucco ' 308 Rough Electrical Residential 309 Rough Electrical Commercial 310 Electrical Meter Residential 311 Electrical Meter Commercial 312 Temp. Const. Meter 313 Rough Plumbing Residential 314 Rough Plumbing Commercial 315 Shower Pan SEE OVER FOR ADDITIONAL INSPECTIONS i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: L/ C11 - 1, -, a 1 Job Address: - " -�-, n C -)-- Permit Number: =} o o C� --/ -;;� / � "n 'r, I A ❑ No one available for inspection: Time c�= o 16AV/PM Re -Inspection required: Yes I *When corrections have been made, call for re -inspection at 303 -234 - Date: l Za //,p ,p / Inspector: -7— DO NOT REMOVE THIS NOTICE /S_ i CITY OF WHEAT RIDGE _:�9�Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 4-/ 031 - r • , a 1 Job Address: 3 a (1G - Permit Number: C 1 7 G 9 Ll -0 a Nil ❑ No one available for inspection: Time q= s-"'-0/PM Re -Inspection required: Yes No When corrections have been made, call for re -inspection at 303 -234 - Date: a4 8 1 Inspector: _7.11 ) DO NOT REMOVE THIS NOTICE City of Wheat Ridge Residential Roofing PERMIT - 201709422 PERMIT NO: 201709422 ISSUED: 12/04/2017 JOB ADDRESS: 3260 Fenton ST EXPIRES: 12/04/2018 JOB DESCRIPTION: Residential re -roofing permit remove and install 30yr Dimensional Asphalt Shingles with 21sq pitch=4/12. East(Back) House *** CONTACTS *** OWNER (720)841-4719 STEVENS JEFFREY SUB (303)437-5568 Garth Stevens 170649 North Tech Contracting LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: UA / Unassigned BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 8,990.00 FEES Total Valuation 0.00 Use Tax 188.79 Permit Fee 188.45 ** TOTAL ** 377.24 *** COMMENTS *** *** CONDITIONS *** Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be required for both the midroof and final inspections. The 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec. R806. The installation of ridge venting requires the installation or existence of soffit venting. For calculation purposes, one hat or turtle vent equal to one-half of one square foot of opening. Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. I* < i s City of Wheat Ridge r "r Residential Roofing PERMIT - 201709422 i PERMIT NO: 201709422 ISSUED: 12/04/2017 JOB ADDRESS: 3260 Fenton ST EXPIRES: 12/04/2018 JOB DESCRIPTION: Residential re -roofing permit remove and install 30yr Dimensional Asphalt Shingles with 21sq pitch=4/12. East(Back) House I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed anJ that all work to be formed is disclosed in this document and/or its' accompanying approved plans and specifications. �C�� Signature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in thepermit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4_ No work of any manner shall be performed that shall results in a change, of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any applicable code or�any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. 1_1�_ a�a4 Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City of Wheat Ridge Residential Roofing PERMIT - 201709421 PERMIT NO: 201709421 ISSUED: 12/04/2017 JOB ADDRESS: 3260 Fenton ST EXPIRES: 12/04/2018 JOB DESCRIPTION: Residential re -roofing permit remove and install 30year Dimensional Asphalt Shingles with 23sq pitch=4/12. 3260 Fenton St -West House *** CONTACTS *** OWNER (720)495-3535 CHARLOTTE M TAYLOR REVOCABLE T SUB (303)437-5568 Garth Stevens 170649 North Tech Contracting LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned SUBDIVISION CODE: UA / Unassigned USE: UA / Unassigned BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 6,900.00 FEES Total Valuation 0.00 Use Tax 144.90 Permit Fee 156.75 ** TOTAL ** 301.65 *** COMMENTS *** J)�, oitavw14 a, (�, 4 0,�J A 4r) QrW7_��, IT't * * * CONDITIONS * * * ti \yj'� 'cnly _' V, —� Midroof L Final Roof inspections for ROOFS 6/12 PITCH L OVER: 3rd par inspection will be required for both the midroof and final inspections. The 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec. R806. The installation of ridge venting requires the installation or existence of soffit venting. For calculation purposes, one hat or turtle vent equal to one-half of one square foot of opening. Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. A City of Wheat Ridge Residential Roofing PERMIT - 201709421 PERMIT NO: 201709421 ISSUED: 12/04/2017 JOB ADDRESS: 3260 Fenton ST EXPIRES: 12/04/2018 JOB DESCRIPTION: Residential re -roofing permit remove and install 30year Dimensional Asphalt Shingles with 23sq pitch=4/12. 3260 Fenton St -West House I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this ermrt. I further attest that I am leggally authorized to include all entities named within this document as parties to the work to be performed and that all work to Wperrmeisdisclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4, No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. -,) --iz. i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: L/ C - � r ' a Job Address: 3 a G o ar „ e -k S -- Permit Number: -0 o 17 0 9 t-/ -Q ) rte►',, C( ) /1/ o -� Q P '�s C-0 „-C Cl P IeGdc.& r -e 9C,e CIL/� p�GGG,e nod% rco c- o..,- 01)�Sr�e ❑ No one available for inspection: Time 9 - -3) �pm Re -Inspection required: es No When corrections have been made, call for re -inspection at 303-234-5933 Date: J'2 114 1-7 Inspector: _71b DO NOT REMOVE THIS NOTICE e A s_ CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: t-% e '9- ,-," Job Address: 3 a I- C Fen o /I S -IL Permit Number: � o 1 7 0 9 L-1 a s +�- nai f�o A iUr-ot.ed _+- CO) ICl4,C%�- i .I Saa C,+f vn P t e a s e r -e S C Ae W. ze_ ❑ No one available for inspection: Time Re -Inspection required: e No When corrections have been made, call for re -inspection at 303-234-5933 Date: li N )/-7 Inspector: Tb DO NOT REMOVE THIS NOTICE