Loading...
HomeMy WebLinkAbout6145 W 46th Avenue0 INSPECTIO� RECORD 0ccgpancy/7'Yx ID JIJKS INSPECTION REQUEST LINE: (303) 234-5933 inspections will not be performed unless this card is posted on the project site. Call the inspection request line before 11:59 P.M. to receive an inspection the following business day.** Inspector Must Sign ALL Inspector Spaces pertinent to this project Foundation - Inspections Date 7 initials Comments Pier Concrete Encased Ground (CEG) [:F:o:u:nd:�ation , Foundation Letter 60 [ Not Pour Concrete ' e Pr - ior To Appi&ja_ bfTk7e­A�yeInspections U Underground/Slab Inspections Date inspector _ Initials Comments Electrical Sewer Service Plumbing Do Not Cover Under round or Below/In-§IabWork Prior TO Approval Of The Above Inspections ---------- Rough Inspections Date Inspector Wall Sheathing Initials Comments Mid -Roof I Lath / Wall Tie LRough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw / Nail Final Inspections Date Inspector Landscaping & Parking / Planning Dept. Initials ROW & Drainage / Public Works Dept. Inspections fron Floodplain Inspection (if applicable) one week in adv inspections call 31 Fire Inspection I Fire Protection -Dist inspections call 31 Final Electrical contact the Fire P ..Final Plumbing Final Mechanical Final Window/Doors I_ Final Building NOTE. All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate Of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. -an e Ow Voltage permits- Please -b -e- surethat I by the Building Division. completed from the J Fre_District and electrical -low voltage inspection "For Inspection Time Window -Please email dge.8:00 A.M. the with the property address in the subject line of the email. Time window is based on the inspector's route.moming of the Occupancy Is Not Permitted Until A Certificate Of Occupancy Is Issued Protect This Card From The Weather 03(764734:� &(4,e5 WA6��INSPECTION RECORD INSPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/inspection INSPECTION REQUEST LINE: (303) 234-5933 Occunancv/Tvoee 1(?-, Inspections will not be performed unless this card is posted on the project site. **Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Comments Initials Pier Concrete Encased Ground (CEG) Foundation / P.E. Letter Do Not Pour Concrete Prior To Approval Of The Above Inspections Underground/Slab Inspections Date Inspector Comments Initials Electrical Sewer Service Plumbing Do Not Cover Underground or Below/In-Slab Work Prior To Approval Of The Above Inspections Rough Inspections Date Inspector Initials Comments Wall Sheathing Mid -Roof Lath /Wall Tie Rough Electric Rough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw / Nail Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing C Final Mechanical Rooflohwh Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. For low voltage permits — Please be sure that rough inspections are completed from the Fire District and electrical low voltage by the Building Division. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather City of Wheat Ridge Residential Roofing PERMIT - 201704736 PERMIT NO: 201704736 ISSUED: 07/25/2017 JOB ADDRESS: 6145 W 46th AVE EXPIRES: 07/25/2018 JOB DESCRIPTION: Residential Re -roof to install GAF Timberline asphalt shingles with 21 sq. *** CONTACTS *** OWNER (303)763-9114 MAUPIN ROGER SUB (303)763-9114 Scott Riopelle 019938 Interstate Roofing Incorporate *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 5,520.00 FEES Total Valuation 0.00 Use Tax 115.92 Permit Fee 140.90 ** TOTAL ** 256.82 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed.