Loading...
HomeMy WebLinkAbout5904 W. 37th Place5904 w 37th pl. T2&ructurai Engineering Post Office Box 7821, Loveland, Colorado 80537 Office: (970) 663-6016 January 11, 2021 BTM 37th, LLC 4134 Fenton Street Denver, CO 80212 Foundation Reinforcement Observation The 37th Place SFR 5904 West 37th Place Lot 2, Metz Estates Subdivision Wheat Ridge, CO Project Number: 20-250-32 Dear Mr. Metz: On January 8, 2021 a representative of this office visited the site referenced above to observe the foundation wall reinforcement size, and location and to confirm the vertical reinforcement spacing in foundation forms. The reinforcement appeared to be in general compliance with the foundation drawing and details by T2 Structural Engineering, project number: 20-250, dated December 18, 2020. The #4 Ufer bar is 20 -feet long (min.) and is connected to the bottom row of continuous rebar in the foundation. The Ufer bar is located in the east garage/basement foundation wall approximately 3 -feet 6 inches back from the south (rear) garage/basement foundation wall. Protect freshly placed concrete from temperatures that will compromise the design strength of the concrete. Concrete placement and reinforcement is to be installed in accordance with ACI 318 and IRC. Please contact this office if there are questions or if additional information is required. Thank you for the opportunity to work with you on this project. Sincerely, Russell T Russell T. Zoetewey, P.E. Enclosures dg, am OQ`P� C ussell T Date:�',)byll. 15:30 -0 7'00' 46611 '�L�ONAL ENS Trrfr „�—a� egm7"nn�,.. t£