Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
9271 W. 48th Avenue
111220-2 Q MobileEyes Arvada Fire Protection District T, Fire Marshal's Office 7903 Allison Way - Arvada, CO 80005 Main 303-424-3012 - Fax 303-432-7995 www.arvadafire.com Address 9271 West 48TH Avenue Job Number: 200319001 KK Wheat Ridge, CO 80033 Occupar t Name: Clubhouse Permit Number: 200319001 -KK Contract r: TJ Cavarra Permit Issued On: 11112/2020 Taylor Kohrs, LLC 303-928-1851 Permit Expires On: 11!1212021 Inspections Required: Construction Fire Safety. Site, New Permit Contacts: None Building Job Desi ription: The property owner is planning to build a new community center in the existing Caesar Square Apartment community. The new building will have space for community gathering, educational functions, workshop for maintenance, and teasing offices for management. The building is not a sprinkered building. and is type VB construction, ARVADA FIRE PERMHT NEW BUILDING TO REQUEST INSPECTIONS, LOG ON TO THE CONTRACTOR PERMIT PORTAL AND REQUEST THE INSPECTION FOR THIS PERMIT- YOU CAN ACCESS THE CONTRACTOR PERMIT PORTAL AT http://www.mobile-eyes.com/PA—index.asp Inspection Description Date PASS FAIL PERMI COMPLETE (AFPD INSPECTOR SIGNATURE): DATE: w 2-- W? -f NOTICEWNTRACTORS • ins)ection _Z requests must be requested through Mobile Eyes 24-48 hours before the desire rdt date. The request does not guarantee that date/time is av ilable_ Inspections will be scheduled based on individual inspector availability. You will receive a confirmation email with the actual date/time of the inspection. • NO inspections will occur without Fire District approved plans or comments available on-site. • Additional • Wo-k-skall • Failed requirements not indicated on this -card may. be necessary -refer to approved plans and comment letter. be in compliance with approved plans. Work not in compliance or that does not meet minimum standards may require additional inspections. inspections may require additional fees for re -inspection. • Failed inspections will result in a 24 hour waiting period until a re -inspection can be requested. • Ins)ections • Bui • Post may reveal corrections necessary to bring work into compliance with applicable codes and standards. ding FINAL inspection and approval is necessary prior to occupancy. this record in a conspicuous place. • Loss or destruction of this card will require replacement and may require additional fees. ittps:/ww,v.mobile-eyes.com/MobileEyes3/TrackPermits—BasicPermit.asp?PID=4915&PPID=4945 1/1 c7%2/ W �lS �� 1-" 2nz 0 � `J 6/ ( [4" " onro° a(*] Il July 21, 2021 Foothills Regional Housing 7490 West 45th Avenue Wheat Ridge, 80033 Attn: Mr. Howard Wright RE: Construction Materials Testing and Inspections - Foundation Caesar Square - Community Building 9271 W 481" Ave. Wheat Ridge, Colorado Permit No. 202000616 Terracon Project No. 25201154 Dear Mr.: Wright Terracon Consultants, Inc. (Terracon) provided testing and observation services for the foundations for the community building construction at the above referenced project from September 10, 2020 to October 23, 2020. To the best of our knowledge and available information, the soils, concrete, reinforcing steel elements that were tested and/or observed by Terracon for the building foundation are in general accordance with the project plans, specifications, and approved RFI's by the Engineer Of Record provided to Terracon. It should be noted that our testing and observation services were performed on an as -requested basis, and only when requested by our client or their designated representative. We offer no opinion regarding materials not tested or observed by Terracon representatives. This letter is provided solely for the benefit for the above -listed and does not impact in any way the rights and obligations of third parties, including contractors and subcontractors who may have provided the materials and/or construction services tested or observed. Respectfully Submitted; Terracon Consultants, Inc. Redman , DN:icn=signed byRedman,, D ndE, —Legal Hold Users, D a n E email=Dan Redman@terracon com Date: 2021.07.21 09:13.32 -06'00' Daniel E Redman Senior Project Manager F. Stewart Ward, F Senior Project Enc Terracon Consultants, Ina 10625 W. 1-70 Frontage Rd N, Ste 3 Wheat Ridge, Colorado 80033 P [303] 423-3300 F [303] 423-3353 vmmterracon.com Lawrence H. Finn & Associates, Inc. 55 S. Elm Ave., Suite 220 —Eaton CO 80615 ® Phone (970) 454-5351—Fax (970) 454-5391 2389 CERTIFIED TEST, ADJUST, AND BALANCE REPORT 9271 w 48th ave 202000616 DATE 7/14/2021 PROJECT Caesar's Square — Community Building 9271 W. 48' Ave. Wheat Ridge, CO 80033 * * * Final Report — Revision 41 * * * ARCHITECT $ 4xyo Studio 646 Architecture, LLC 15940 S. Golden Road Golden, CO 80401 REICHEL 2369 Exp. 313122 ENGINEER Belfay Engineering 2811 W. 9' Ave. Denver, CO 80204 CONTRACTOR Air Comfort, Inc. 150 Rome Court Fort Collins, CO 80524 Lawrence H. Finn & Associates, Inc. N*t® 55 S. Elm Ave, Suite 220 - Eaton, CO 80615 2389 Phone (970) 454-5351- Fax (970) 454-5391 PROJECT: Caesar's Square — Community Building ADDRESS: 9271 W. 48th Ave. Wheat Ridge, CO 80033 The data presented in this report is an exact record of the system performance and was obtained in accordance with NEBB Standard Procedures. Any variances from design quantities which exceed NEBB tolerances are noted throughout the report. The air distribution systems have been tested & balanced and final adjustments have been made in accordance with NEBB "Procedural Standards for Testing, Adjusting & Balancing of Environmental Systems" and the project specifications. NEBB TAB FIRM: Lawrence H. Finn & Associates, Inc. REG. NO.: 2389 CERTIFIED BY: David C. Reichel DATE -7/14/2021 The hydronic distribution systems have been tested & balanced and final adjustments have been made in accordance with NEBB "Procedural Standards for Testing, Adjusting & Balancing of Environmental Systems" and the project specifications. NEBB TAB FIRM: Lawrence H. Finn & Associates, Inc. REG. NO.: 2389 CERTIFIED BY: David C. Reichel DATE -7/14/2021 SUBMITTED & CERTIFIED BY NEBB TAB FIRM: Lawrence H. Finn & Associates, Inc. TAB SUPERVISOR: David C. Reichel REG. NO.: 2389 SIGNATURE: DATE: 7/14/2021 CERTIFICATION EXPIRATION DATE: 3/31/2022 Lawrence H. Finn & Associates, Inc. Ne rBl6 2389 Table Of Contents PROJECT: CaestanSiouare Community Building DATE 7A DA021LOCATION: Wheat Ridge Cry CONTACT Joe CaganonAUTHOR Table OF Contents 1 Instrument Calibration Report Fell 1 2Abbreviation Report par 2 3 Fan Cue 3 31FUR 01 3 4 Fan UniL........... A.1 EF 01............ 5 Scheduled Prints ptl! 51 Site Improvements 511 C1 PRELIMINARY GRADING 5.12 DM DEMOLITION PLA 513 C1 SITE PLAN 514 C2 GRADING PIAN 515 C3 UTILITY PLAN 515 C4 EROSION CONTROL PIAN 5v CD -CONSTRUCTION DETAILS 518 Co 2, CONSTRUCTION DETAILS 519 CD 3 CONSTRUCTION DETAILS 5110 CD 4 CONSTRUCTION DETAILS 5111 CD 5 CONSTRUCTION DETAILS 5112 TTAFI RE TRUCK ANALYSIA 5113A l01 51 15 F 100 51 16 F 101 51 17 F 200 51 18 F 201 51 19 FALCO 5.120 E5100 5.121 E5101 5122 E3200 521 522 523 524 525 525 52] LH. Finn endAerocass Final Report Godson Lawrence H. Finn & Associates, Inc. Ne BB 2389 Table Of Contents PROJECT: Caesi Community Building DATE 7A 4,2021 LOCATION: Wheat Ridge CO CONTACT Joe Caganon AUTHOR oeCasanon 528 Al 105 529 Al 301 5210 Al 302 5211 Al 401 5212A1 402 5213 Al 403 5214 Al 404 5215 Al 601 5216A1 602 521] Al 603 5218 Al 701 5219 Al 800 5220 Al 801 5221 81 000 5222 81 001 5223 81 101 5224 81 mm 5225 9000 5226 9100 5227 P1 000 5228 P1 100 5229 E1 000 5230 E1 100 5231 El 200 5232 El 300 531, 532, 533, 534, 535, 535, 53], 530, 539, 5310 5311 5312 5313 5314 5315 5316 LH. Finn endylid ee Final Report FannonM Lawrence H. Finn & Associates, Inc. Ne BB 2389 Table Of Contents PROJECT: Caesi Community Building DATE 7A 4,2021 LOCATION: Wheat Ridge CO CONTACT Joe Caganon AUTHOR oeCasanon 5317 P2 601 5318 P2 602 5319 P2 603 5320 P2 701 5321 P2 800 5322 P2 801 5323 M 000 5324 M 001 5325 52 101 5320 52 mm 532] 9000 53209100 5329 P2 000 5330 `2100 5331 `22210 5332 F2 000 5333 F2100 5334 F22210 5335 F22211 5336 F2300 54 Building 8 541 A3001 542 A3 002 543 A3 003 544,3100 545,3101 540,3102 54],3103 548,3104 549,3105 5410,3106 5411 ,3301 5412,3302 5413,3303 5414,3304 5415,3305 5416,3306 541],3307 5418,3308 5419,3309 5 420 ,3 401 5421 ,3 402 LH. Finn endylia ee Final Report FannonM Lawrence H. Finn & Associates, Inc. Ne BB 2389 Table Of Contents PROJECT: Caesi Community Building DATE 7A 4,2021 LOCATION: Wheat Ridge CO CONTACT Joe Caganon AUTHOR oeCasanon 5422 A3 601 5423 A3 602 5424 A3 603 5425 A3 701 5426 A3 800 5427 A3 801 5428 A3 802 5429 A3 803 5430 A3 804 5431 A3 805 5432 A3 806 5433 A3 807 5 434 53 100 543553101 5436 S3 101D 5437M 00 5438M 100 5439 P3-000 5440 P3 100 5441 P3 200 5442 © 000 5443 ©100 5444 ©101 5445 ©102 5446 © 200 544] © 201 5448 © 300 5449 © 301 55 Buildings and 5 8 551/16 001 552 All 002 553 All 003 554/16100 555/16101 555/16102 59/16103 558/16104 559/16105 5510/16106 5511 /16301 5512/16302 5513/16303 LH. Finn andAerocass Final Report FannonM Lawrence H. Finn & Associates, Inc. Ne BB 2389 Table Of Contents PROJECT: Caesi Community Building DATE 7A 4,2021 LOCATION: Wheat Ridge CO CONTACT Joe Caganon AUTHOR oeCasanon 55 14 All 304 55 15 All 305 55 16 All 306 551]/K307 5518 All 401 5519 All 402 5520 All 601 5521 All 602 5522 All 701 5523 All 800 5524 All 801 5525 All 802 5526 All 803 5527 All 804 5528 All 805 5529 a 100 5530 a 101 5531 a mm 5532 M 00 5533 M 100 5534 F' 000 5535 F 100 5536 E5 000 553] E5100 5538E5101 5539 E5102 5540 E5200 5541 E5201 5542 E5300 5543 E5301 56 Community Building 8 561 4001 5624002 563 4C 102 56440101 5654101 5664102 56]4103 5684104 5694201 56104202 5611 4201 LH. Finn endylia ee Final Report FannonM Lawrence H. Finn & Associates, Inc. Ne BB 2389 Table Of Contents PROJECT: Caesi Community Building DATE 7A 4,2021 LOCATION: Wheat Ridge CO CONTACT Joe Caganon AUTHOR oeCasanon 56124301 5613 4402 5614 4403 5615 4404 56164405 561] 4406 5618 4800 5619 5100 5620 5101 5621 5102 5622 5200 5623 MC -000 8 5624 MC 100 9 5625 MC 2f10 10 5626 MC 2f11 11 562] PC 000 5620 PC 100 5629 PC 200 5630 E0000 5631 EC 100 5632 EC 200 5633 EC 300 5634 EC 301 LH. Finn endylid ee Final Report FannonM Lawrence H. Finn & Associates, Inc. 55 S. Elm Ave, Suite 220 - Eaton, CO 80615 ® Phone (970) 454-5351 - Fax (970) 454-5391 2389 INSTRUMENT CALIBRATION REPORT Project: Caesar's Square - Community Building Manufacturer Model Serial Application Cal. Date Alnor HM -675 72032022 Hydronic Press. & Diff. Press. 8/18/2020 Extech 461895 Q477125 Rotation Measurement 1/4/2020 Fluke 336 97110538R Electrical Measurement 1/6/2020 Evergreen Telemetry S -PVF -1 1600314 Pressure Velocity Module 5/4/2021 Evergreen Telemetry MS-T&H-101 2000111 Module Sensor T&H 6/11/2020 Evergreen Telemetry PR -T-4-6 2000138 Temperature Probe (Insertion) 6/12/2020 Evergreen Telemetry PR -T-5 2000300 Temperature Sensor 10/8/2020 Evergreen Telemetry S -H-3-5' 2000345A Humidity Sensor 10/3/2020 Evergreen Telemetry S -DP -250 1 2000190 lWater Press. Sensing Module 12/14/2020 REMARKS: Not all equipment shown was used on this project. 1 of 11 Lawrence H. Finn & Associates, Inc. 55 S. Elm Ave, Suite 220 - Eaton, CO 80615 ® Phone (970) 454-5351 - Fax (970) 454-5391 2389 ABBREVIATION REPORT Project: Caesar's Square - Community Building Symbol Description Symbol Description A Airflow (L/S) NA Not Applicable AF Air Foil NI Not Installed ANA Access Not Available NIC Not In Contract BI Backward Incline NM Not Measurable CD Ceiling Diffuser NPT No Pressure Tap CFM Airflow (Cubic Feet / Minute) NR Not Readable DD Direct Drive NS Not Shown DWDI Double Width Double Inlet NT No Information Tag EAT Entering Air Temperature OD Outside Diameter EF Exhaust Fan RPM Revolution Per Minute EG Exhaust Grille SD Supply Diffuser ER Exhaust Register SNKL Snorkel ESP External Static Pressure SP Static Pressure EWT Entering Water Temperature SPD Static Pressure Drop FC Forward Curve SR Supply Register GPM Waterflow (Gallons / Minute) SWSI Single Width Single Inlet HC Heat Coil T Temperature ( F ) HEX Heat Exchanger TSP Total Static Pressure HRC Heat Recovery Coil VFD Variable Frequency Drive Hz Hertz VS Variable Speed ID Inside Diameter W Waterflow (US) In. WC Inches of Water Column LAT Leaving Air Temperature LWT Leaving Water Temperature REMARKS: 2of11 Lawrence H. Finn & Associates, Inc. Ne BB 2389 Fan Coil PROJECT: CaesanAquare Community Building DATE 7A D2021 LOCATION: Wheat Ridge CO CONTACT Joe Caganon AUTHOR Joe Caganon SYSFEMNrvIF: RURAL FURAl Supply Umlel Summary Tested 6y: Joe cxsxnon Dale: TJF2021 Unit Code MA UP Meter Hedso Meter R.Ad Vale MI FrAmps AD IT. 115 US Amps M:�iNi As Kai rumum FAI r in Per on Fifter Type Do 101 So 1 Filter Rise Aundmil 305 359 87 103 DMI C Me Design Anne CFM DMI CHMARTRA nor CFM Outode Ar CFM Design 0 CFM Outside Ar CFM Roger 0 CFM Return Air CF M Denign Anne CFM ReturnAr CFMApA3I nor CFM MI Tl Up 121 Vale Anne Tl 18 Amps AT do E S P In 031 In Up 11 FURAl Supply Umlel Summary Tested 6y: Joe cxsxnon Dale: TJF2021 Systerni eager Dole MA UP Meter Hedso Meter R.Ad Vale MI FrAmps AD IT. 115 US Amps or rumum Di Am Reed no rumum FAI r in Per on Moor neing Mine I, pro J�r�e Systerni My IRA or rumum Di Am Reed no rumum FAI r in Per on in Dei OU19 01 101 So 1 go pre 305 359 87 103 2 02 1011 So 11 An pe R7 1 370 125 106 O��g 031 ; 101 So 11 yen W PU i OR AT do 101 11 0904 Ase 05 102 So 1 0 Too AT I I Too on do U19 06 102 So 1 0 Too J, I I Too run do I eyes LH. Finn endAerodetee Final Report Fannon M 3of11 Lawrence H. Finn & Associates, Inc. Ne BB 2389 Fan Coil PROJECT: CaesanAquare Community Building DATE So D2021 LOCATION: Wheat Ridge CO CONTACT Joe Caganon AUTHOR Joe Caganon svnEwurvR: Fuam 'It Supply Omlel Summary Tested 6y: Joe cxsxnon Dale: mrzozl Unit DATA MA UP KEZ Prize Meter HeTs Meter R.Ad Benz MI FrAmps AD IT. 115 ITS Amps D She. DATA Fifter Type D. 107 PC 1 Filter Size 151 F7 say 168 too DMI C My Design Maps CFM DMI CHMARTRA 1014 CFM Outode Per CFM Design 0 CFM Outside Per CFM Roger 0 CFM Return Air CF M Dozen Maps CFM ReturnAr CFMApA3I 1014 CFM MI Tl Up 122 Benz Anne Tl 13 Amps 168 104 pulse 04 IT Already C D 2 12,12 85 99 so 116 'It Supply Omlel Summary Tested 6y: Joe cxsxnon Dale: mrzozl LH. Finn endAerodetee Final Report Fannon M 4 of eager DO. MA UP KEZ Prize Meter HeTs Meter R.Ad Benz MI FrAmps AD IT. 115 ITS Amps D She. DATA Di An OU19 01 LH. Finn endAerodetee Final Report Fannon M 4 of D Di An OU19 01 107 PC 1 24,24 225 F7 say 168 too pulse 02 109 PC 1 24,24 150 And 155 157 103 pulse 03 103 PC 2 12,12 50 84 52 168 104 pulse 04 IT Already C D 2 12,12 85 99 so 116 101 LH. Finn endAerodetee Final Report Fannon M 4 of Lawrence H. Finn & Associates, Inc. Ne BB 2389 Fan Unit PROJECT: CaesanSquare Community Building DATE 7A D2021 LOCATION: Wheat Ridge CO CONTACT Joe Caganon AUTHOR Joe Caganon SYSFEM/ONIC EFL1 Tested By: Joe Castanet Bale: mrzozi Log: IE 1 mrzmi eo. C.t..on dmov n.o .mi. aiotis speed LH. Unit DAR. Kpi HP NS IT P on Type Fenn suing on Rise 6 ID Kpi HeTs An IT. Amps 0 to 22 Rings She. DAR. Test DAR. TADI CFM Design 75 CFM TADI CHMARTRA Se CFM Kpi Tl 12 121 Jet SP In Actual 0 in se. SP 0i Al se. TADI SP Design 0 2 in se. TADI SP Actual main se. Log: IE 1 mrzmi eo. C.t..on dmov n.o .mi. aiotis speed LH. eager DA. Kpi HP NS IT P Kpi RPM Ease CSPM RPM Kpi RARd Jet 115 Rene Kpi HeTs An IT. Amps 0 to 22 Rings She. DAR. Log: IE 1 mrzmi eo. C.t..on dmov n.o .mi. aiotis speed LH. Finn endAye tee Final Report Revivon M 5of11 Lawrence H. Finn & Associates, Inc. Ne BB 2389 Fan Unit PROJECT: CaesanSquare Community Building DATE 7A D2021 LOCATION: Wheat Ridge CO CONTACT Joe Caganon AUTHOR Joe Caganon SYSFEM/ONIC EFL2 Tested By: Joe Castanet Bale: 7DC2621 Log: IE 2 mrzmi eo. C.t..on dmov n.o .mi. aiotis speed LH. Unit DAR. Kpi HP NS IT P on Type Fenn suing on Rise 6 ID Kpi HeTs An IT. Amps 0 to 22 Rings She. DAR. Test DAR. TADI CFM Design 75 CFM Kpi Tl 12 121 Jet SP In Actual 0 in se. SP 0i Al se. TADI SP Design 0 2 in se. TADI SP Actual main se. Log: IE 2 mrzmi eo. C.t..on dmov n.o .mi. aiotis speed LH. eager DA. Kpi HP NS IT P Kpi RPM Ease CSPM RPM Kpi RARd Jet 115 Rene Kpi HeTs An IT. Amps 0 to 22 Rings She. DAR. Log: IE 2 mrzmi eo. C.t..on dmov n.o .mi. aiotis speed LH. Finn endAye tee Final Report Revivon M 6of11 Lawrence H. Finn & Associates, Inc. Ne BB 2389 Fan Unit PROJECT: CaesanSquare Community Building DATE 7A D2021 LOCATION: Wheat Ridge CO CONTACT Joe Caganon AUTHOR Joe Caganon SYSFEM/ONIC EFL3 Tested By: Joe Castanon Bale: mrzozi Log: IEF 03 mrzmi eo. C.t..on dmov n.o .mi. aiotis speed LH. Unit DAR. Kpi HP NS IT P on Type Fenn suing on Rise 6 ID Kpi HeTs An IT. Amps 0 to 22 Rings She. DAR. Test DAR. TADI CFM Design 75 CFM TADI CHMARTRA 90 CFM Kpi Tl 12 121 Jet SP In Actual 0 in se. SP 0i Al se. TADI SP Design 0 2 in se. TADI SP Actual main se. Log: IEF 03 mrzmi eo. C.t..on dmov n.o .mi. aiotis speed LH. eager DA. Kpi HP NS IT P Kpi RPM Ease CSPM RPM Kpi RARd Jet 115 Rene Kpi HeTs An IT. Amps 0 to 22 Rings She. DAR. Log: IEF 03 mrzmi eo. C.t..on dmov n.o .mi. aiotis speed LH. Finn endAye tee Final Report Revivon M 7oryl 10 of 11