Loading...
HomeMy WebLinkAbout2023 - RESO - 27 - Amending Renewal Wheat Ridge Bond FundCITY OF WHEAT RIDGE, COLORADO RESOLUTION NO. 27 Series of 2023 TITLE: A RESOLUTION AMENDING THE FISCAL YEAR 2023 RENEWAL WHEAT RIDGE BOND FUND BUDGET TO REFLECT THE APPROVAL OF A SUPPLEMENTAL BUDGET APPROPRIATION IN THE AMOUNT OF $308,627 FOR THE PURPOSE OF MAKING A PAYMENT TO XCEL ENERGY TO UNDERGROUND THE EXISTING OVERHEAD ELECTRIC LINES TO ALLOW FOR THE CONSTRUCTION OF THE WHEAT RIDGE ꞏ WARD STATION PEDESTRIAN BRIDGE WHEREAS, the City Council wishes to construct a pedestrian bridge over the G Line tracks; and WHEREAS, insufficient appropriations in the 2023 Renewal Wheat Ridge Bond Fund Budget exist to cover the expenditure; and WHEREAS, there is adequate unallocated funding in the Renewal Wheat Ridge Bond Fund to cover this expense; and WHEREAS, the Wheat Ridge Charter requires that amendments to the budget be effected by the City Council adopting a resolution. NOW, THEREFORE, BE IT RESOLVED by the Wheat Ridge City Council, that: Section 1. A transfer of $308,627 is hereby approved from Fund 40 to account 40-103-800-805. Section 2. A payment of $308,627 to Xcel Energy is hereby approved to underground the existing overhead lines to allow for construction of the pedestrian bridge over the G Line tracks. DONE AND RESOLVED this 8th day of May 2023. Bud Starker, Mayor ATTEST: Steve Kirkpatrick, City Clerk Revision August 3, 2021 Nonrefundable Quote Letter Page 1 of 2 ______________________ ________________________________ ________________________________ ___________________________, _____ ___________ Subject: Request for ____________________, _____________________________________ at _______________________________________, _____________________________________, __________________________________, Colorado Dear _________________________________, I have completed the engineering design and cost estimate to provide __________________ ______________________________________ based upon information you have provided. This design is based upon __________________ _____________________________________, as shown on the enclosed drawing. The cost to provide the requested __________________ _____________________________________, is ________________, which is non-refundable and payable in advance. This proposal is contingent upon the following: x All work performed during our normal work hours. x Obtaining “Right-of-Way” at no cost to us. x Obtaining permits as needed. x No frost, in the ground, during construction or agreeing to pay for additional costs during frost conditions. x There is an additional charge to open the transformer. x Providing final grade elevations, at our equipment locations. x Grade at trench location to be within 6 inches of the final grade. If necessary our right-of-way agent will mail the right-of-way or easement documents to the appropriate landowners for their signature. This proposal is contingent upon receiving easements at no cost to us. Our right-of-way agent will need a copy of the Warranty Deed, the legal description, and the site drawing in order to prepare the easement for the landowner’s signature. NOTE: You must personally contact the local telephone company, the local cable TV company and/or any other utility company to arrange for the installation and payment of any costs of their facilities if they need to be relocated or disconnected along with the ____________________________________________. If you accept the above costs and system design, please sign and date the second page of this letter and return this document to Public Service Company of Colorado, at the address shown below. After the signed and dated documents and total payment of ________________ are received via the payment process, a work order will be issued and released so your project can be placed on the construction schedule. If a check is sent via the new payment process we are CITY OF WHEAT RIDGE 7500 W 29TH AVE WHEAT RIDGE CO 80033-8001 Electric OH to UG conversion W 49TH PL BETWEEN VAN GORDON ST AND TABOR ST WHEAT RIDGE JEFFERSON CITY OF WHEAT RIDGE Electric OH to UG conversion Electric OH to UG conversion Electric OH to UG conversion $ 308,626.37 OH to UG conversion $ 308,626.37 Revision August 3, 2021 Nonrefundable Quote Letter Page 2 of 2 unable to accept checks with any sort of Lien Waiver because our Tariffs do not make an allowance for PSCo to accept checks printed or stamped with a lien waiver. Our current lead- time to begin work after receiving the payment and signed documents is approximately ____ weeks. You will be notified of the week that our construction is scheduled to begin as soon as it is available. This proposal will be valid until ___________________. If you have any questions regarding this project, please call me at _____________________. Sincerely, I have reviewed and approve of the enclosed design. I accept the cost of _________________ and this amount will be paid to Xcel Energy in full prior to the scheduled construction date. The Construction Cost stated above does not include special items such as but not limited to frost or rock conditions. In the event the Company encounters any special items during construction, the Company shall bill Applicant for such special items as a non-refundable contribution in aid of construction. I will send a signed copy of this letter with the applicable agreements. March 10, 2023 303-425-3994 Daniel Nival $ 308,626.37 Daniel Nival Designer Thereafter 5460 WEST 60TH AVENUE ARVADA, CO 80003 303-235-2863 N/A 7500 W 29TH AVE WHEAT RIDGE, CO 80033-8001 Andrew Feldkamp Digitally signed by Andrew Feldkamp Date: 2023.02.17 14:23:31 -07'00' Andrew Feldkamp 04/25/2023 Bud Starker Mayor 05/08/2023 X The City of Wheat Ridge