Loading...
HomeMy WebLinkAboutResolution-2003-0010 CITY OF WHEAT RIDGE, COLORADO- RESOLUTION NO. lO-2003 SerIes 2003 TITLE: A RESOLUTION SUPPORTING THE WADSWORTH CORRIDOR STUDY AND THE US 6/SH l2l INTERCHANGE RECONSTRUCTION FEASIBILITY STUDY BEING ADDED TO THE REAUTHORIZATION OF THE TEA-2l LEGIS LA TION WHEREAS, State Highway 121, Wadsworth Boulevard, is on the National Highway System (NHS), and; WHEREAS, Wadsworth Boulevard IS a major regIonal arterial in the Denver area Regional TransportatIon Plan, and, WHEREAS, Wadsworth Boulevard IS an arterIal roadway In the CountywIde Transportation Plan, and, WHEREAS, Wadsworth Boulevard is an arterIal roadway In the City of Lakewood's Major Street Plan, carrying In excess of 55,000 vehicles per day, and, WHEREAS, the Wadsworth Boulevard and US 6 Interchange is a part of the unfounded ih Pot requested by the Colorado Department of TransportatJon for reauthorization, and, WHEREAS, Wadsworth Boulevard has been submItted by Jefferson County as a project request for the federal transportation reauthorIzation, NOW, THEREFORE, BE IT RESOLVED, by the City CouncIl of the City of Wheat Ridge, that: SECTION 1. The City of Wheat Ridge supports Inclusion of the COrrIdor Feasibility study of Wadsworth Boulevard in Jefferson County, from C-470 to US 36, In the federal transportation reauthorIzatJon bill. SECTION 2. The City of Wheat RIdge supports inclusion of the FeasibIlity Study for the US 6/ SH l2l (Wadsworth) Interchange In the federal transportatIOn reauthorizatIOn bill and FY 2004 appropriation. DONE AND RESOLVED this 27th day of May 2003 ~ /\j~ <oj . C()v..n~4- Gr":'t~Rell C""l V'"-llJ, ~y1ayor N\A'IOfZ f(!.l) -T~"" ATTEST: / . I ~t/ -~ '-- JL??--, (,' ....- ~'-?7 ~ Wanda Sang, City Clerk .~