Loading...
HomeMy WebLinkAbout04-07-2025 - Study Session Agenda PacketSTUDY SESSION AGENDA CITY COUNCIL MEETING CITY OF WHEAT RIDGE, COLORADO Monday, April 7, 2025 6:30 p.m. This meeting will be conducted as a virtual meeting, and in person, at: 7500 West 29th Avenue, Municipal Building, Council Chambers. City Council members and City staff members will be physically present at the Municipal building for this meeting. The public may participate in these ways: 1. Attend the meeting in person at City Hall. Use the appropriate roster to sign up to speak upon arrival. 2. Provide comment in advance at www.wheatridgespeaks.org (comment by noon on April 7, 2025) 3. Virtually attend and participate in the meeting through a device or phone: Click here to pre-register and provide public comment by Zoom (You must preregister before 6:00 p.m. on April 7, 2025) 4. View the meeting live or later at www.wheatridgespeaks.org, Channel 8, or YouTube Live at https://www.ci.wheatridge.co.us/view Individuals with disabilities are encouraged to participate in all public meetings sponsored by the City of Wheat Ridge. The City will upon request, provide auxiliary aids and services leading to effective communication for people with disabilities, including qualified sign language interpreters, assistive listening devices, documents in Braille, and other ways of making communications accessible to people who have speech, hearing, or vision impairments. To request auxiliary aid, service for effective communication, or document in a different format, please use this form or contact ADA Coordinator, (Kelly McLaughlin at ada@ci.wheatridge.co.us or 303-235-2885) as soon as possible, preferably 7 days before the activity or event. Public Comment on Agenda Items 1. 2024 Boards and Commissions Annual Report 2. Hotel Licensing Update 3. Outdoor Pool Replacement Community Engagement 4. Staff Report(s) 5. Elected Officials’ Report(s) ITEM NO 1 Memorandum TO: Mayor and City Council THROUGH: Patrick Goff, City Manager Marianne Schilling, Assistant City Manager FROM: Cole Haselip, Management Analyst DATE: April 7, 2025 SUBJECT: 2024 Boards and Commissions Annual Report ISSUE: Staff has completed the second Boards and Commissions Annual Report, highlighting the achievements of each public body through the 2024 calendar year, outlining anticipated activities for 2025, and providing information about current members. Staff liaisons and commission members will attend the April 7, 2025, Study Session to present their updates. PRIOR ACTION: The City Council requested an annual report from staff outlining the activities of the City’s boards and commissions at the August 7, 2023, Study Session. FINANCIAL IMPACT: None. BACKGROUND: The second Boards and Commissions Annual Report was developed through a collaborative, cross-departmental effort, with contributions from the staff liaisons of each board, commission, and committee. Comprised of approximately 85 dedicated volunteers, these public bodies reflect the community’s commitment to shaping Wheat Ridge’s future. The report highlights their accomplishments in 2024 and outlines the key issues they anticipate addressing in 2025. The report features descriptions of nine public bodies, each tackling distinct issues. Some make quasi-judicial land-use and building decisions, others provide recommendations to staff or City Council, and some allocate grants to community partners or organize events. Many engage in a combination of these activities. The diversity of their roles, alongside the dedication of their volunteers and supporting staff, makes them invaluable to the City’s success. To better celebrate the contributions of these volunteers, staff has invited the chairs of Study Session Memo – 2024 Boards and Commissions Annual Report April 7, 2025 Page 2 each public body to present directly to City Council. While not all public bodies will have chair presentations due to feasibility and varying activity levels, those that do will provide an opportunity for Council members to engage directly with the individuals driving these initiatives. These presentations will complement the report by addressing questions and fostering dialogue between the City Council and members of these public bodies. RECOMMENDATIONS: None ATTACHMENTS: 1. 2024 Boards and Commissions Annual Report ATTACHMENT 1 2024 Boards and Commissions Annual Report City staff is excited to present the second Boards and Commissions Annual Report. This project was a collaborative, cross-department effort, involving the staff liaison to each board, commission, and committee included within. A testament to the community’s willingness to contribute toward the next chapter of Wheat Ridge, these public bodies are comprised of approximately 85 volunteers from across the City. This report aims to acknowledge the significance of their hard work by providing insight into the accomplishments of each public body in 2024 and outlining some of the key issues they anticipate addressing in 2025. Enclosed within is a description of 8 public bodies, each committed to addressing unique issues. Some engage in quasi-judicial land-use and building decisions, while others provide recommendations to staff or the City Council. Certain public bodies allocate grants to community partners or organize community events. Some engage in a combination of each of these activities. Enhanced by the diversity of their focus areas and roles within City processes, the value of these bodies, their dedicated volunteers, and the staff that support them are indispensable to the City’s success. This report features all the City’s Boards and Commissions, Hybrid (Staff and Council-Selected) and Council-Selected Committees. These bodies, and those that are similar will be included in the annual report moving forward. Beginning March 1, 2024, the City has implemented term limits for public bodies. Members will become term limited after serving two consecutive three-year terms. The only exception is the Election Commission. Due to its unique function, members will become term limited after serving three consecutive two-year terms. The pages for each public body include a table listing member names, member positions, terms served, and the expiration date of their current term. Accompanying each member, you will see a “0” for terms served beginning March 1, 2024. This is because the City has only just begun tracking “terms served”. This column will be updated accordingly in the future. If members of the public are interested in serving on one (or more) of these public bodies, they should apply by visiting the City’s website. Table of Contents Community Partners Grant Program Committee ………………………...1 Building Code Advisory Board …………………………………………..2 Board of Adjustment ……………………………….…………………….3 Planning Commission ………………………………………….…........…4 Sustainable Wheat Ridge …………………………………………………6 Election Commission ……………………………………………………..8 IDEA Committee ……………………………………………………...….9 Parks and Recreation Commission ………………………………...……11 Cultural Commission …………………………………………………....13 Community Partners Grant Program Committee MI S S I O N The Community Partners Grant Program (CPGP) is a City-sponsored grant program that supports area non-profit agencies and programs that benefit and improve the health and wellness of Wheat Ridge residents. The CPGP Committee's mission is to review all applications to the program and presents its award recommendations to the City Council for approval. 20 2 4 AC H I E V E M E N T S The CPGP Committee reviewed applications and presentations from 43 community organizations, representing $382,000 in funding requests, an increase of 15 applicants and $98,000 compared to the previous year. After evaluating each request, the Committee recommended awarding $200,000 to community partners in the 2024 City Budget, consistent with the previous year’s funding. However, due to budget constraints, the program's budget was reduced by 10% later in the year. 20 2 5 UP C O M I N G The CPGP will implement a new two-part review process in 2025 to streamline the evaluation of smaller grants while providing more time to review larger ones. The program’s timeline will also shift later in the year to align more closely with the City’s budget process. This adjustment ensures that applicants and the review committee begin the process with a clearer understanding of the program’s available funding. Additionally, starting in 2025, the CPGP will no longer accept applications from organizations that already receive funding through other areas of the City’s budget. CO M M I S S I O N M E M B E R S COMMITTEE MEMBER DISTRICT TERMS SERVED SINCE MARCH 1, 2024 TERM EXPIRATION DATE Jeffrey Richards I 0 3/2/27 Kelly Trace I 0 3/2/28 Lindsay Schwerman II 0 3/2/27 Alex Gouldsmith II 0 3/2/28 Allison Vitello III 0 3/2/27 Amanda Fixsen III 0 3/2/28 Raven Newberry IV 0 3/2/27 Charles Hood IV 0 3/2/28 2023 BOARDS, COMMISSIONS, & VOLUNTEERS BBQ CPGP COMMITTEE ADVERTISEMENT 1 Building Code Advisory Board MI S S I O N The Building Code Advisory Board's mission is to review appeals of the decisions and determinations of the Chief Building Official (CBO). In this capacity, they make decisions regarding code interpretations, contractor license suspensions, and the suitability of alternate building materials and methods of construction. 20 2 4 AC H I E V E M E N T S There were no appeals filed in 2024, and therefore no meetings of the BCAB. 20 2 5 UP C O M I N G The BCAB will serve in an advisory capacity in 2025 as part of the City’s adoption of updated building codes. BO A R D M E M B E R S COMMITTEE MEMBER DISTRICT TERMS SERVED SINCE MARCH 1, 2024 TERM EXPIRATION DATE Al Gallo I 0 3/2/2026 Jason McCullough II 0 3/2/2028 Ronald Abo III 0 3/2/2027 Justin Slocum IV 0 3/2/2027 Nathan Hoppe At-Large 0 3/2/2026 LUTHERAN HOSPITAL AT CLEAR CREEK CROSSING COMPLETED SUMMER 2024 THE IVES APARTMENTS AT 4470 WADSWORTH COMPLETED SPRING 2024 2 Board of Adjustment MI S S I O N The Board of Adjustment's mission is to review and make quasi-judicial decisions on requests for variances and waivers related to the City’s Zoning Ordinance and Sign Code. The Board also makes official interpretations of these regulations. 20 2 4 AC H I E V E M E N T S The Board met twice in 2024, once for attorney training and once to review two variance requests. The Board typically reviews variances or waivers from the strict application of measurable standards, such as building setbacks, greater than 50%. Variances are meant for unique sites with steep slopes or unusually shaped lots that cannot accommodate a traditional building. Because of that, very few variances are heard by the Board. 20 2 5 UP C O M I N G There are currently no items for upcoming meeting agendas. BO A R D M E M B E R S COMMITTEE MEMBER DISTRICT TERMS SERVED SINCE MARCH 1, 2024 TERM EXPIRATION DATE Tom Zelenko I 0 3/2/2028 Amanda Rodriguez I 0 3/2/2027 Alistair Huber II 0 3/2/2028 Larry Richmond II 0 3/2/2026 Laura Sicard III 0 3/2/2026 Michael Griffeth III 0 3/2/2027 Paul Hovland IV 0 3/2/2026 Thomas Burney IV 0 3/2/2027 John Troisi At-Large 0 3/2/2028 Betty Jo Page At-Large 0 3/2/2027 Andy Sulak At-Large 0 3/2/2026 SETBACK VARIANCE FOR CARPORT GARAGE CONVERSION 2024 BOARDS, CMSNS., & VOL. BBQ 3 Planning Commission MI S S I O N The Planning Commission's mission is to guide the physical, economic, and social development of Wheat Ridge through the creation, amendment, and implementation of a comprehensive land use master plan. As a quasi-judicial body, the Commission provides recommendations to the City Council on land use cases, including rezonings and planned developments. Additionally, it advises on amendments to Chapter 26 of the City's Municipal Code, which governs zoning and development. 20 2 4 AC H I E V E M E N T S In 2024, the Commission heard a variety of cases including: •Three Specific Development Plans •Two Outline Development Plan amendments •Six zone changes •Five study sessions on the City Plan and Lutheran Legacy Campus zoning •Two resolutions for creation of Urban Renewal Areas •Code ordinances including: o Electric vehicle parking requirements o Bicycle parking and storage requirements o Public hearing notification requirements o Landscape regulations o Lutheran Legacy Campus mixed-use zoning regulations o Natural medicine regulations In most cases, the Commission makes recommendations to the City Council. CITY PLAN INVOLVEMENT CLEAR CREEK CROSSING PASEO ILLUSTRATION 4 Planning Commission 20 2 5 UP C O M I N G The Commission recommended approval of the rezoning of the Lutheran Legacy Campus in February 2025. The Commission will continue to be informed and involved throughout Phase 4 of the City Plan process and the Plan will be brought to the Commission for consideration in early- to mid-2025. CO M M I S S I O N M E M B E R S COMMITTEE MEMBER DISTRICT TERMS SERVED SINCE MARCH 1, 2024 TERM EXPIRATION DATE Cody Hedges I 0 3/2/2028 Krista Holub I 0 3/2/2027 Daniel Graeve II 0 3/2/2028 Kristine Disney II 0 3/2/2026 Susan Wood III 0 3/2/2028 Patrick Quinn III 0 3/2/2026 Syrma Quinones IV 0 3/2/2027 Michael Moore IV 0 3/2/2026 ILLUSTRATION FROM THE NEW LANDSCAPE CODE ZONING MAP 5 Sustainable Wheat Ridge MI S S I O N Sustainable Wheat Ridge's mission is to advise the City of Wheat Ridge on matters pertaining to environmental sustainability and promote sustainability programs to residents and businesses within the City of Wheat Ridge through engagement and outreach. 20 2 4 AC H I E V E M E N T S •Mayor’s Monarch Pledge Proclamation. •Onboarded five new Sustainable Wheat Ridge committee members. •Completed the 2024 Sustainability Action Plan update, achieving the first adopted Sustainability Action Plan in Wheat Ridge. •Assisted with public engagement for the Residential Waste Engagement Project, supporting the final recommendations that were presented to City Council. •Hosted an e-waste recycling event, a paint recycling event, a yard waste compost weekend, and volunteered at zero waste stations at the Holiday Celebration. •Applied and got accepted into the Colorado Green Business Program, launching a local program for the City. •Presented the annual Green Business Award to Ch’il Indigenous Foods. •Provided research to staff and leadership about EV parking regulations. •Supported the Sustainable Neighborhoods program, with residents designing, planting, and maintaining two new native plant demonstration gardens at Panorama Park and Paramount Park. RIBBON CUTTING WITH MAYOR STARKER AT PANORAMA PARK GARDEN PLANTING DEMONSTRATION GARDEN AT PANORAMA PARK 6 Sustainable Wheat Ridge 20 2 5 UP C O M I N G •Continue to pursue grant funding and new programming. •Present a Climate Emergency Resolution to City Council. •Implement next steps from Residential Waste Engagement project outcomes. •Baseline municipal waste, energy, and water usage data and work to set reduction targets. •Continue to support the Sustainable Neighborhoods program and other ongoing programming including Mayor’s Monarch Pledge, Fresh Food Connect, and Garden In A Box. •Expand participation in the Colorado Green Business Network program. •Host annual events like yard waste composting, paint recycling, and e-waste. •Work to make City events such as the egg hunt and holiday celebration zero waste. CO M M I T T E E M E M B E R S COMMITTEE MEMBER District TERMS SERVED SINCE MARCH 1, 2024 TERM EXPIRATION DATE Corinne Anderson I 0 3/2/28 Alix Finnegan II 0 3/2/28 OPEN III 0 3/2/27 John Derosier IV 0 3/2/28 Amy DePierre At-Large 0 3/2/26 Michaela Butler At-Large 0 3/2/26 Joy Opp At-Large 0 3/2/26 Sara Nepomuceno At-Large 0 3/2/26 Betsy Coppock At-Large 0 3/2/27 Conner Denton At-Large 0 3/2/27 Stew Stewart At-Large 0 3/2/27 Amanda Burch At-Large 0 3/2/28 Rachel Hultin City Council Liaison 0 3/2/26 SUSTAINABLE APPLEWOOD VILLAGES E-WASTE EVENT YARD WASTE COMPOSTING EVENTS WITH SCRAPS 7 Election Commission MI S S I O N The Election Commission's mission is to develop procedures to establish proof of residency when it is in question, determine the winner of an election by lot in the event of a tie vote, and advise on general voting matters. 20 2 4 AC H I E V E M E N T S The Election Commission did not meet in 2024. 20 2 5 UP C O M I N G The Election Commission will meet prior to the November 2025 Election to discuss coordinated election procedures. CO M M I S S I O N ME M B E R S COMMITTEE MEMBER DISTRICT TERMS SERVED SINCE MARCH 1, 2024 TERM EXPIRATION DATE* Elisa White At-Large 0 12/11/2025 Wanda Sang At-Large 0 12/11/2025 Margy Greer Sr. Deputy City Clerk N/A N/A * Election Commission terms expire at the end of a calendar year to better align with election cycles. TEAM WHEAT RIDGE AT 2023 CARNATION FESTIVAL VOTE PIN 8 IDEA Committee MI S S I O N The IDEA Committee's mission is to advise the City Council on policies and practices to make Wheat Ridge a more diverse, equitable, and inclusive community. The Committee acts as a liaison between the community and the City Council, organizes events and activities that promote inclusion, diversity, equity, and accessibility (IDEA), and fosters mutual respect and understanding of all persons. 20 2 4 AC H I E V E M E N T S On May 25, 2020, the City Council formed a 20-member Race and Equity Task Force. The task force reviewed City policies, services, and ordinances, identifying inequities. Their findings were incorporated into the 2023 Race and Equity Task Force Recommendation Report. The Council accepted the report and created an advisory committee to continue the work of the task force. As a result, the City Council created the Inclusion, Diversity, Equity, and Accessibility (IDEA) Committee at the August 7, 2023, Council Meeting. In 2024, the first members of the Committee were appointed, and the inaugural meeting of the IDEA Committee was held on September 10, 2024. In 2024, the Committee set priorities and a work plan for 2025 and introduced itself to the public at the Holiday Tree Lighting ceremony. 20 2 5 UP C O M I N G In 2025, the IDEA Committee will focus on homelessness, economic opportunity, affordable housing, human resources, and creating/implementing events that promote diversity, equity, and inclusivity in the community. 2024 HISPANIC HERITAGE MONTH PROCLAMATION BOARDS, CMSNS., & VOLS. EVENT 9 IDEA Committee CO M M I T T E E M E M B E R S COMMITTEE MEMBER DISTRICT TERMS SERVED SINCE MARCH 1, 2024 TERM EXPIRATION DATE Morgan Richards I 0 3/2/2027 Jae Kim II 0 3/2/2027 Cindy Chang III 0 3/2/2027 Lin Browning IV 0 3/2/2027 Gretchen Trefz At-Large 0 3/2/2026 Terra Greer At-Large 0 3/2/2026 Alexander Gouldsmith At-Large 0 3/2/2027 Edward Nepomuceno At-Large 0 3/2/2027 Carter Lyn At-Large 0 3/2/2028 Vacant At-Large 0 3/2/2028 Jenny Snell City Council Liaison 0 3/2/2026 BOARDS, CMSNS., & VOLS. EVENT HOLIDAY EVENT IDEA COMMITTEE MEETING HOLIDAY EVENT 10 Parks and Recreation Commission MI S S I O N The Parks and Recreation Commission's mission is to regularly consult with the Parks and Recreation Director, acts as a liaison between the community and the Parks and Recreation Department, and make recommendations on related matters to staff and the City Council. 20 2 4 AC H I E V E M E N T S •Participated in the Wheat Ridge Parks & Recreation Pathway update, providing valuable feedback, championing the efforts, and encouraging community engagement at events like Ridgefest, the Lutheran Hospital Grand Opening, Performances in the Park, and more! •Drafted letters of support for various grant applications (State Historic Fund, Great Outdoors Colorado, and more). •Participated in a Leave No Trace workshop, led by the City’s environmental interpreter. •Engaged with School of Mines team working on Creekside Stabilization project. •Took part in an annual Wheat Ridge Parks tour, specifically visiting current and future project sites. •Discussed capital projects funded in the 2025 budget. •Represented the Parks & Recreation Commission at the following events: o Earth Day/Arbor Day Celebration o National Public Lands Day o Annual Boards & Commissions Celebration o Public Art Dedication - “Dancing Pony” by Kevin Box o Annual Goat Parade o Green at 38th Kick-off Event SCHOOL OF MINES PRESENTATION – CREEKSIDE STABILIZATION PARKS & RECREATION COMMISSION 11 Parks and Recreation Commission 20 2 5 UP C O M I N G •Planning to participate in visioning sessions related to the Wheat Ridge Parks & Recreation Pathway update and seeing the plan through to adoption. •Preparing to elect a new chair and vice chair. •Interested in observing numerous park projects come to fruition. •Committed to continue supporting various grant efforts. •Looking toward participating in upcoming City events, ribbon cuttings, volunteer opportunities, etc. •Excited to create more community engagement opportunities! CO M M I S S I O N M E M B E R S COMMITTEE MEMBER DISTRICT TERMS SERVED SINCE MARCH 1, 2024 TERM EXPIRATION DATE Ralph Habben I 0 3/2/2027 Ryan Hester I 0 3/2/2028 Christine Samaniuk II 0 3/2/2026 Kathy Weisbrodt II 0 3/2/2027 Kathy Koniz III 0 3/2/2026 Mark Doody III 0 3/2/2027 Pat Cervera IV 0 3/2/2026 Andrew Rasmussen IV 0 3/2/2027 PATHWAY ENGAGEMENTEARTH DAY/ARBOR ANNUAL GOAT PARADE 12 Cultural Commission MI S S I O N The Cultural Commission's mission is to promote artistic endeavors within the City by encouraging an appreciation for arts and culture, developing and recommending cultural programming to the City Council, and seeking community input and advice on the management of public art. 20 2 4 A C H I E V E M E N T S Connectivity Pillar Accomplishments: •April mixer event at Clear Creek Makerspace, 40 attendees, introduction of artists and community to the newly opened space, participants were given time to speak about their projects and needs, raffle of 5 pieces of art purchased by the WRCC from local artists. •October mixer event at Little Brazil, 50 attendees, celebrating the relocation of Little Brazil, a cultural institution, focused on expanding audience to include community educators, raffle of Little Brazil gift cards purchased by the WRCC. •Mixers accounted for $1117 of annual budget. •Supported City programming with commissioners attending all evening Performances in the Park and the Egg-Stra Special Easter Egg Hunt, passing out chalk, crayons, and coloring books. Over 1,000 temporary tattoos were passed out from our truck at Trunk-or-Treat, and we helped revelers decorate 1,000 sugar cookies at the Holiday Celebration. •Joined multiple creative organizations to walk in the Wheat Ridge Carnation Festival Parade, passing out chalk, crayons, and coloring books. •Commissioners participated in painting the Wheat Ridge cityscape on the Clear Creek Makerspace building while offering “Paint with a Commissioner” chats. •Commissioners assisted in asphalt mural painting for traffic calming on Miller St. Programming Pillar Accomplishments: •Hosted one huge call for art, receiving 63 submissions from 34 artists with at least one piece purchased from each submitter. Accounted for $2572 of annual budget. •Led two Arts Drop programs, Winter and Summer. Thirty pieces dropped in city parks, 28 artists were compensated and highlighted on social media, we promoted four local business partners, Knitters Therapy, Singularity Tattoo, Anteak Booteak, and Swiss Flower, and the Wheat Ridge Rec Center. •Established rotating display of art in the Wheat Ridge Rec Center lobby display case. 13 Cultural Commission 20 2 4 A C H I E V E M E N T S Community Grant Funding Pillar Accomplishments: •Hosted two calls for grant applications, providing $3,868 in reimbursement funds towards creative and enrichment activities for individuals and/or businesses in Wheat Ridge. Many of these organizations, such as Foothills Community Choir, Beehive, Anteak Booteak, were not able to move forward with their events unless they received funding. •Grant Program Statistics: Winter/Spring 2024 Summer/Fall 2024 Applications: 8 7 Funded: 6 6 Dollars allocated: $2,500 $2,000 Dollars spent: $2,047 $1,821 Organizations who received funding during each window: Foothills Community Choir Beehive Artspot Co-Op Anteak booteak Artcentric Mestizo Brew Cantina - Dia de Los Muertos celebration Mestizo Brew Cantina - Cinco De Mayo celebration Wheat Ridge Art League Artisan Market Wheat Ridge (Let's Create) Foothills Community Choir Localworks Art on the Farm Social Media & Communications Accomplishments: •Created WRCC Instagram account to expand community reach. •Created WRCC email list, sending 10 group emails regarding WRCC calls for art, calls for grant applications, mixers, and participation opportunities. •Began using Meta Business App and Plannable to pre-schedule Arts Drop posts and to coordinate posts across Facebook and Instagram. Placed our first sponsored post for the October mixer and received direct feedback that the sponsored posts drove attendance. •Submitted monthly updates to the Wheat Ridge Creates email newsletter. •Revamp of WRCC page on city website to update content and meet ADA requirements. •Ended the year with 266 Instagram followers, 959 Facebook followers, and 261 members in our email list. 14 Cultural Commission 20 2 4 AC H I E V E M E N T S Other Achievements: •Onboarded two new commissioners. Eliminated physical commissioner binder, moving to Google drive for 100% sustainable documentation. Binder structure is archived if a current or subsequent commissioner requests a physical binder in the future. •The 2024 Cultural Commission Business Award was presented to Artcentric. Sweet Ridge Studios and Singularity Tattoos were runners up. •Partnered with Intermountain Health to acquire art from the legacy Lutheran Hospital campus. •Promoted our first WRCC survey, via October mixer, social media, and email, asking for feedback on the year and ideas for moving forward. •Received strong feedback from community members and city staff as to high level of functioning and engagement. •Provided letter of support for Localworks, Clear Creek Makerspace for the National Endowment for the Arts Grants for Arts Projects Program grant. •Provided letter of support for a USDA Urban Forestry Grant Program and a State Historical Fund Competitive General Grant. •Acquired WRCC business cards and banner to help build relationships and presence in the community. 20 2 5 U P C O M I N G •More mixer events, including an opportunity to share legacy Lutheran art with the community. •Expanding Arts Drop to include more interactive and experiential art opportunities, with connection of the Arts Drop and First Friday events •Reviewing Arts Drop and Grant application process to ensure a broad reach, that application is not a barrier to participate, and to be more inclusive of creative forms. •Develop communications calendar to better support volunteer time. •Try to maintain high level of engagement with 30% budget decrease. CARNATION FESTIVAL PARADE CULTURAL COMMISSION MIXER 15 Cultural Commission CO M M I S S I O N M E M B E R S COMMITTEE MEMBER DISTRICT TERMS SERVED SINCE MARCH 1, 2024 TERM EXPIRATION DATE Kathleen Martell, Chair I 0 3/2/2026 Celia Daly, Vice Chair & Programming Pillar Lead I 0 3/2/2027 Meggen Rumley, Connectivity Pillar Second II 0 3/2/2026 Beth Kelley, Connectivity Pillar Second II 0 3/2/2027 Kathy Plummer, Programming Pillar Second III 0 3/2/2026 Sandra Davis, Communications & Social Media III 0 3/2/2027 Lindsay Burney, Community Grant Pillar Lead IV 0 3/2/2026 Brendan Kelley, Connectivity Pillar Lead IV 0 3/2/2027 Jeff Richards, Community Grant Pillar Second At-Large 0 3/2/2027 CARNATION FESTIVAL PARADE EASTER EGG HUNT 16 ITEM NO. 2 Memorandum TO: THROUGH: FROM: DATE: SUBJECT: Mayor and City Council Patrick Goff, City Manager Allison Scheck, Deputy City Manager Christopher Murtha, Chief of Police Marianne Schilling, Assistant City Manager April 7, 2025 Hotel Licensing Update ISSUE: On October 25, 2021, City Council passed ordinance 1723, adding new article XIV to Chapter 11 and updating use schedules in Chapter 26 of the Wheat Ridge Code of Laws to establish a hotel licensing program. Sec. 11-569 of the Code requires the Council to review the implementation of the ordinance every 18 months. This report provides an update about the progress and current status of the hotel licensing program. There are no recommendations for code amendments at this time. PRIOR ACTION: On July 15, 2019, staff presented options to City Council for an extended stay lodging ordinance. Based on input from City Council at the study session, staff sent a framework from the proposed ordinance to several regional hotel operators and received comment back in September 2019 from one operator. On June 28, 2021, unanimous consensus was received from City Council to direct staff to draft a hotel licensing and extended stay ordinance and to reach out to the Wheat Ridge business community for feedback. A copy of the draft ordinance and a frequently asked question document was sent to all hotel business owners and managers in Wheat Ridge on August 13, 2021. A virtual meeting was held on August 30, 2021, to receive input from the hotel industry on the draft ordinance. City Council passed ordinance 1723 on October 25, 2021, with an effective date of November 12, 2021, enacting the hotel licensing program. City Council passed ordinance 1771 on August 29, 2023, updating the hotel licensing program to clarify that allowing stays in excess of 29 days without an approved Study Session Memo – Hotel Licensing Update April 7, 2025 Page 2 Extended Stay Addendum is a violation of the hotel licensing program; clarifying annual renewal expectations, defining “length of stay” and clarifying the “calls for service” calculation. BACKGROUND: The intent of the hotel licensing ordinance is to address the significant public safety and other related concerns involving hotels within the City. In particular, at the time Council was considering this licensing program, the nine hotels in Wheat Ridge represented less than 0.05% of the total number of households and businesses in the City yet accounted for approximately 10% of the total police calls for service. As a result of ordinance 1723, hotels in Wheat Ridge must have a hotel license, in addition to their regular business license, to operate. In order to receive a hotel license, hotels must do the following (please see attached code excerpt for exact requirements): • Maintain a call for service (CFS) rate of 1.5. • Participate in the City’s certified crime free hotel/motel program annually. • Make necessary corrective actions in response to the annual hotel/motel inspection coordinated by the Police and Community Development Departments. • Comply with the City’s landscape inspection program. • Comply with applicable building codes. • Have a current and approved Wheat Ridge Police Department (WRPD) security plan on file with the City. • Not offer guest stays of more than 29 days without obtaining an extended stay addendum to the hotel license. In order to obtain an extended stay addendum, properties must meet certain criteria including: o Units must be at least 300 square feet with a separate living room of at least 120 square feet. o Cooking facilities must be in units including a refrigerator, cooktop, dedicated sink and cabinets with cooking and dining supplies. o Maximum occupancy per room is two persons per dedicated bedroom. o Adequate storage must exist per unit. o Housekeeping must be available. o The business must have 24-hour desk staffing. o WIFI must be available within the room charge. o In-room or common area laundry facilities must exist. o Properties must include three of the following common area amenities:  Business center;  Fitness center;  Swimming pool;  Meeting areas or conference rooms; or  On-site restaurant or other food options. Study Session Memo – Hotel Licensing Update April 7, 2025 Page 3 FINANCIAL IMPACT: The current hotel license fee is $300 annually. Due to the likely expense of fulfilling the extended stay requirements through renovations, there is no charge for an extended stay addendum. The City’s lodging tax rate is 10%, in lieu of sales tax. This tax generated $2,292,714 in revenues in 2024 - $1,146,357 to the General Fund; $687,814 to the Crime Prevention Fund; and $458,543 to the Capital Improvement Program Fund. Per Council’s direction, the City spent $474,912 of ARPA funds to help long-term residents in the City’s hotels find permanent housing through an innovative partnership with Family Tree. The biggest financial investment with regards to this program is staff time. Since the passage of this ordinance, a cross-departmental City staff team meets frequently and works collaboratively to address challenges and monitor enforcement. DISCUSSION: Overall, the hotel licensing program is having the desired effect of reducing crime in Wheat Ridge, particularly in the area surrounding I-70 and Kipling. The following discussion covers the current status of hotels in Wheat Ridge, licensing update, long-term hotel residents and public safety update. Hotels in Wheat Ridge When the hotel regulations were developed and adopted, Wheat Ridge had nine (9) hotels. Shortly thereafter, the Howard Johnson hotel located at 44th Avenue and Ward Road sold to 2nd Chance Homes, Inc. and was rezoned to Mixed Use-Commercial (MU-C) on January 10, 2022. Tabor Lake Apartments opened in 2023, and the 108-room hotel is now a 100-unit apartment building offering workforce housing in the range of $1,000 - $2,000 per month for rent. In January 2023, Terrapin Hospitality, the owner of the Holiday Inn Express in Wheat Ridge, purchased the American Motel at 10101 W Interstate 70 Frontage Rd. The site was rezoned to MU-C Interstate on July 11, 2022, in anticipation of a redevelopment of this site. Trinsic Residential Group is now under contract with Terrapin to purchase the property for a scrape of the current structure and the construction of a 350 multi-unit residential development. Trinsic’s design is complete and is awaiting a power upgrade by Xcel Energy before closing on the property. Terrapin is currently operating a portion of the hotel until demolition begins later this year. In May 2023, the Best Interstate Inn at 4735 Kipling Street sold to Ville Property Management, a real estate investment firm out of Salt Lake, Utah. Ville rezoned the property to MU-C Interstate in June 2023. Ville is in the process of renovating the current Study Session Memo – Hotel Licensing Update April 7, 2025 Page 4 structures on site to create a deeply affordable multi-unit community complete with case management and onsite services. Ville is not currently accepting over-night stays and is working with current residents to assist them in relocating to permanent housing. Finally, the Hampton Inn at Clear Creek Crossing is almost complete and is expected to open in late spring. In addition, the Clear Creek Crossing development will see an additional hotel property in 2026. Licensing Update The remaining six hotels, including Apple Inn and Suites (formerly Affordable Inn), Holiday Inn Express, Super 8, Motel 6, La Quinta, and Comfort Inn, are still in operation and remain compliant with hotel and business licensure requirements. Staff have worked through various licensing challenges since implementation of the ordinance including extended stay violations and license application denials based on a property exceeding the CFS requirement. In cases where a property exceeds the CFS and is not eligible for license renewal, they may be granted a six-month extension of the existing license to give them time to apply strategies to reduce crime at the property. In several instances, this has been a successful strategy. In 2024, Motel 6 was unable to improve the rate of crime within the extension timeframe and therefore was facing closure. The City worked with the property owner to reach an agreement whereby permanent fencing was installed and additional contracted security was provided to align with the community’s expectations. This property was eventually sold to a new owner. Long-Term Hotel Residents At the time the regulations were developed, staff were aware that numerous individuals were using the hotels for long-term lodging. Some individuals had been residents of hotels in the Kipling and I-70 corridor for many years. Ultimately, hotels are an expensive means of lodging and do not provide a safe and stable environment for long term use. City Council spent $474,000 of ARPA funds to a contract with Family Tree to help long term residents of hotels find permanent housing. The funding paid for staffing, deposits, rent, move-in assistance and case management. From May 2022 until the program wrapped up at the end of March 2024, Family Tree successfully placed 40 households (64 individuals) in long term, permanent housing. Public Safety Update Since the Ordinance was enacted, a 28.5% reduction in criminal complaints and criminal activity within a geographical area approximately ¼ mile from the I70/Kipling corridor has been recorded. The reduction in crimes and calls for service at Wheat Ridge hotels is down more than half since the inception of the licensing ordinance. The hotel CFS rate has reduced the amount of allocated time from 10% to 4% of the entire City’s resource distribution for police services. These decreases have allowed the WRPD to focus on other issues in areas outside of the I70/Kipling corridor. Study Session Memo – Hotel Licensing Update April 7, 2025 Page 5 CFS 2022 2024 American Motel 2.99 1.79 Apple Inn 0.133 0.03 Comfort Inn 1.09 0.92 Holiday Inn 1.11 0.05 La Quinta 0.55 0.05 Motel 6 3.68 0.17 Super 8 2.24 0.36 The challenges presented at the American Hotel are as a result of a lack of re-investment due to its pending sale. Staff understands the American Hotel, with a chronic CFS issue, will cease operations in the near future as the pending sale/transition to housing units is imminent, but in the meantime, the department continues to work with the American Hotel to reduce crime to the degree possible. Staff has been quick to react to transgressions and relationships with hotel ownership and staff. The City’s commitment to help this business community thrive has allowed for the return to acceptable CFS numbers within a short time. Currently, only one hotel is in serious danger of losing their business license should they fail to transition to housing as expected. The original sale of the American Motel and recent sale of Motel 6 demonstrate the inability of the former property owners to meet the standards of the Wheat Ridge community. The resource commitment to the hotels and areas surrounding the hotels remains higher relative to all other businesses in Wheat Ridge. The Police Department continues to spend time in the area of concern (at or around the hotels) as well as meeting with hotel management and ownership. This important work has enhanced the positive perception of the surrounding area and allowed for additional investment in future business and housing opportunities. RECOMMENDATIONS: There are no recommendations to update the code at this time. This report is for information only. ATTACHMENTS: 1. Hotel Licensing Code Excerpt PART II - CODE OF LAWS Chapter 11 - LICENSES, PERMITS AND MISCELLANEOUS BUSINESS REGULATIONS ARTICLE XVI HOTEL LICENSES Wheat Ridge, Colorado, Code of Ordinances Created: 2025-03-20 15:11:09 [EST] (Supp. No. 74, Upd 1) ATTACHMENT 1 Page 1 of 8 ARTICLE XVI HOTEL LICENSES1 Sec. 11-560. Findings. The city council finds this article is needed for the protection of the health and safety of the public, and further to that end, finds as follows: (1) Calls for service at hotels within the city are disproportionately higher than other businesses and residences. The use of police department resources in responding to these calls for service is excessive. (2) The nature of calls for service at hotels include unwanted parties, disturbances, welfare checks, theft, suspicious persons and vehicles, drug calls, domestic violence, assaults, motor vehicle thefts and motor vehicle recoveries. (3) Hotels with high calls for service evolve into nodes of illegal activity, including drug dealing, prostitution and other illicit behaviors. (4) Adopting stronger local requirements to limit illegal activities in hotels and motels is an essential tool to further combat economic blight in the city. (5) It is necessary to establish and enforce standards for hotels by providing for a separate licensing system, including inspection and revocation or suspension of licenses if determined that the hotel is not operated consistent with established standards and/or contributes disproportionately to calls for services or documented rates of illegal activity. (Ord. No. 1723, § 1, 10-25-21) Sec. 11-561. Definitions. The following words, terms, and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Calls for service are public initiated dispatched calls for police assistance that are generated by the community, through a call or text to 911 or the non-emergency line. Calls for service includes community calls for any police response such as non-criminal activity, disturbances, supicious vehicles or persons, and crime reports. Calls for service does not include calls for fire or medical assistance without police response, calls initiated by the Wheat Ridge Police Department, officer initiated traffic stops, routine patrol, or 911 hang ups without police response. Calls for service rate is equal to the total calls for service at the licensed premises divided by the total number of hotel rooms in the applicable period. Calls for service received on severe weather days, as declared by the severe weather shelter network, are not included in a hotel's calls for service rate calculation. 1Ord. No. 1723, § 1, adopted October 25, 2021, set out provisions intended for use as article XIV, §§ 11-500—11- 509. To preserve the style of this Code, and at the editor's discretion, these provisions have been included as article XVI, §§ 11-560—11-569. Created: 2025-03-20 15:11:09 [EST] (Supp. No. 74, Upd 1) Page 2 of 8 Extended stay lodging is the renting of a hotel room for a duration of stay greater than twenty-nine (29) consecutive days. Extended stay lodging includes transient lodging establishments constructed and operated to provide accommodations for longer term stays by including additional common area amenities and in-room cooking facilities beyond what might be provided in the standard hotel establishment. Hotel is a transient lodging establishment renting individual rooms for temporary occupancy and typically not including facilities for cooking. The term "hotel" includes establishments also known as "motels." Licensed premises include a hotel and its buildings, land, parking areas and accessory structures. (Ord. No. 1723, § 1, 10-25-21; Ord. No. 1771, § 1, 8-28-23) Sec. 11-562. License required; licensee fee; license renewals. (a) Issuance. No person shall conduct or operate a hotel without first having obtained a hotel license issued by the city as required by this article. Applicants for a hotel license shall pay the applicable fee. (b) Renewal. The renewal of an existing hotel license issued pursuant to this article shall be granted upon the payment of the annual license fee and the filing of a completed renewal application in the form set forth in section 11-563 with the treasurer at the same time as the renewal application for the business license for the hotel. The treasurer may waive the timely filing requirement if the licensee demonstrates in writing that the failure to complete timely filing is not solely the result of neglect. (c) The failure to approve or renew or the denial or revocation of either the hotel license or the business license for that operation shall automatically revoke the corresponding business or hotel license, as applicable. (d) Term. The term of a hotel license shall be one (1) year and shall run concurrently with the associated business license under article II of this chapter. (Ord. No. 1723, § 1, 10-25-21; Ord. No. 1806, § 9, 10-28-24) Sec. 11-563. Application form; processing. (a) All applicants for a hotel license shall file a completed application with the treasurer on forms provided by the treasurer. (b) The completed application shall contain the following information and shall be accompanied by the following documents: (1) The business name and address of the applicant. If the applicant intends to operate the hotel under a name other than that of the applicant, the applicant shall state the business name to be used and submit copies of documentation evidencing the registration of the business name under applicable laws. (2) Each individual applicant, partner of a partnership, managing officer or managing director of a corporation, the manager of a limited liability company and all business managers shall be named in each application form. (3) If the applicant is: a. An individual, the individual shall state such person's legal name and any aliases and submit satisfactory proof that the individual is eighteen (18) years of age or older; b. A partnership, the partnership shall state its complete name and the names of all partners, whether the partnership is general or limited, and provide a copy of the partnership agreement, if any; Created: 2025-03-20 15:11:09 [EST] (Supp. No. 74, Upd 1) Page 3 of 8 c. A corporation, the corporation shall state its complete name, the date of its incorporation, evidence that the corporation is in good standing under the statutes of the State of Colorado, or in the case of a foreign corporation, evidence that it is currently authorized to do business in the State of Colorado, the names and capacity of all officers, directors, and the name of the registered corporate agent and the address of the registered office for service of process; d. A limited liability company, the company shall state its complete name, the date of its formation, evidence that the company is in good standing under the statutes of the State of Colorado, or in the case of a foreign company, evidence that it is currently authorized to do business in the State of Colorado and the name of its members, the manager, and registered agent and the address of the registered office for service of process. (4) The location of the hotel, including a legal description of the property, street address, and telephone number(s). (5) For renewal applications, proof of compliance with requirements outlined in section 11-564. (Ord. No. 1723, § 1, 10-25-21) Sec. 11-564. Eligibility requirements for hotel license. No hotel license shall be issued or maintained under this article unless and until the applicant provides sufficient information to establish, and the treasurer reviews and determines the sufficiency of the same, of the following requirements: (1) The applicant shall have achieved and maintained a call for service (CFS) rate of 1.8 within twelve (12) months of obtaining a hotel license. The required CFS rate shall be decreased to 1.5 on January 1, 2023. The city may in its sole discretion permit extensions of the twelve (12) month period, not to exceed a total of an additional six (6) months during which time the hotel license shall be deemed extended. (2) The applicant shall demonstrate annual participation in the city's certified crime free hotel/motel program, as evidenced by the approval of the Wheat Ridge Police Department. (3) The applicant shall have made all necessary corrective actions in response to matters identified through the city's most recent annual hotel/motel inspection program report for the subject location, which program is enforced through the city's police and community development departments, in cooperation with applicable fire protection districts. (4) The applicant shall demonstrate compliance with the city's landscape inspection program, as applicable and as certified by the community development department. (5) The applicant shall demonstrate compliance with the applicable series of adopted international building and property codes applicable to the subject property, including the International Property Maintenance Code, as demonstrated by certification from the city's chief building official. (6) The applicant shall establish and maintain an approved security plan, including crime prevention through environmental design, video surveillance, security guards, fencing, and lighting, which must be annually approved by the city's police department. (Ord. No. 1723, § 1, 10-25-21; Ord. No. 1771, § 2, 8-28-23) Created: 2025-03-20 15:11:09 [EST] (Supp. No. 74, Upd 1) Page 4 of 8 Sec. 11-565. Approval or denial of application; subpoena powers. (a) A completed license application shall be reviewed by the police department prior to action by the treasurer. The application shall be approved or denied by the treasurer within thirty (30) days of the date of filing. The application shall be denied if: (1) The applicant fails to satisfy the eligibility requirements of section 11-564; (2) The application or any investigation performed or ordered by the city establishes that the proposed licensee fails to conform to any requirement of this article, the Wheat Ridge Code of Laws or other applicable law; and (3) The applicant knowingly made a false statement or knowingly gave false information in connection with the application; or (4) The applicant is overdue in payment to the city of taxes, fees, fines or penalties assessed against the applicant or imposed against the applicant. (b) Nothing in this article shall prevent the treasurer from revoking approval if it is discovered that the application contained or included false or incorrect statements, or information which would otherwise constitute sufficient grounds for the denial of the application. The decision of the treasurer to approve or deny a license application shall not be construed as a quasi-judicial act but shall be a final administrative decision of the city. (c) In the event the treasurer denies the license application the treasurer shall prepare a decision stating the reasons or basis for the denial. A copy of the findings and decision shall be sent to the address of the applicant as shown on the application within ten (10) days after the date of denial. The denial shall become a final administrative decision of the city on the fourteenth day following the date of the decision unless the applicant files a timely appeal, as provided by section 11-567. (d) The treasurer or the treasurer's designee is authorized to issue administrative subpoenas requiring the production of documents, records and other evidence relevant to a determination of a licensee's or applicant's compliance with this article. Administrative subpoenas may be appealed to an administrative hearing officer under the appeals process set forth in article V of chapter 2 of this Code. The sole issue on an appeal of an administrative subpoena is whether the issuing officer exceeded his/her authority in issuing the subpoena. The standard of proof is a preponderance of the evidence, and the burden of proof shall rest with the city to establish that the subpoena at issue lies within the issuing officer's authority. (e) The party issuing a subpoena may maintain possession of subpoenaed documents if there is reasonable suspicion that tampering of such records may occur while an appeal hearing requested under subsection (d) above is pending. During the pendency of any such hearing, the safeguarded records shall not be inspected or otherwise used by the city. (Ord. No. 1723, § 1, 10-25-21; Ord. No. 1748, § 2, 11-14-22) Sec. 11-566. Suspension or revocation of license: grounds. (a) The treasurer may suspend or revoke a hotel license upon the treasurer's finding of any of the following facts in the treasurer's reasonable discretion, based upon available information. It is not required that any criminal conviction be obtained to support the treasurer's administrative action. (1) Failure of the licensee to achieve and maintain the eligibility requirements described in section 11-564; provided, however, the treasurer shall offer the licensee notice and opportunity to cure the identified violations at least thirty (30) days prior to taking further adverse action. Created: 2025-03-20 15:11:09 [EST] (Supp. No. 74, Upd 1) Page 5 of 8 (2) Incidents of disorderly conduct in violation of chapter 16 of this Code have occurred upon the licensed premises or upon any parking areas, sidewalks, access ways or grounds within the immediate neighborhood of the licensed premises involving a customer, manager and/or employee of the licensee; (3) The licensee, manager, or any employee thereof illegally offered for sale or illegally allowed to be consumed or possessed upon the licensed premises or upon any parking areas, sidewalks, walkways, access ways or grounds immediately adjacent to the licensed premises, narcotics or dangerous drugs; (4) The licensee or manager is not upon the licensed premises at all times if the premises is open for business; (5) The licensee, manager or employee has allowed or permitted patrons and employees to engage in acts of prostitution, negotiations for acts of prostitution within the licensed premises or upon any parking areas, sidewalks, access ways or grounds immediately adjacent thereto; (6) The licensee, manager or employee has allowed or permitted customers to engage in public displays of indecency, or has allowed or permitted customers to engage in acts of public urination or defecation within the licensed establishment upon any parking areas, sidewalks, access ways or grounds immediately adjacent thereto; (7) The licensee or manager knowingly made a false statement or knowingly gave false information in connection with an application for license or for a renewal of a license; (8) The licensee has failed to maintain books or records sufficient to properly document the permitted length of stay of individual customers; (9) The licensee is delinquent in payment to the city for taxes or fees. (10) The licensee has permitted extended stay lodging without an approved extended stay license addendum issued pursuant to section 11-568. (1) For purposes of this section, the length of a guest's stay at any licensed premises shall be measured by consecutive overnight stays at any location within the licensed premises. Additionally, the duration of extended stay lodging on a licensed premises shall continue to accrue unless the guest vacates the licensed premises for sixty (60) consecutive days. (b) Summary suspension: the treasurer shall have the discretion to summarily suspend a hotel license in the event the treasurer determines that an immediate threat to public health, safety or welfare is posed by the licensee's failure to comply with the requirements of this article or any conditions of its existing license. In the case of a summary suspension, the licensee shall be afforded a right of appeal substantially in the manner provided at subsections 11-567(b) and (c). (c) Suspensions of a hotel license may be for any term up to a maximum of the amount of time remaining in the one-year term of the license as issued. (Ord. No. 1723, § 1, 10-25-21; Ord. No. 1771, § 3, 8-28-23) Sec. 11-567. Suspension, revocation and appeal procedures. (a) The city treasurer shall have the authority to suspend or revoke hotel licenses. In so acting, the treasurer shall apply the relevant eligibility requirements and standards contained in this article. (b) Appeals. In the event the treasurer denies, does not renew, suspends or revokes a license, the applicant shall have the right to a quasi-judicial hearing before an administrative hearing officer appointed by the city. A written request for hearing shall be made to the treasurer within ten (10) days of the date of mailing of the Created: 2025-03-20 15:11:09 [EST] (Supp. No. 74, Upd 1) Page 6 of 8 treasurer's written decision. The hearing shall be conducted within thirty (30) days of the date of the treasurer's receipt of written request for hearing unless a later date is requested by the applicant. (c) The procedure for the appeal to and in consideration by the administrative hearing officer shall be conducted substantially in the manner described at and sections 11-31 and 11-32 of this Code, provided, however, that the hearing shall be conducted by an administrative hearing officer appointed by the city in compliance with section 2-87. (d) Except in the case of a summary suspension, the hotel may continue to operate during the appeal process and until the final decision of the hearing officer is rendered. (Ord. No. 1723, § 1, 10-25-21) Sec. 11-568. License addendum for extended stay operations. (a) Application. As a part of or separately from an application for a hotel license under this article, the applicant may also apply for the right to offer extended stay lodging as defined in section 11-561 in all or portions of the licensed hotel property. Applications for an extended stay addendum to a hotel license shall be filed on forms provided by the treasurer and shall include the following information: (1) Number of rooms and a percentage of square footage in the hotel to be devoted to extended-stay operations. (2) Certification of compliance with requirements of subsections (b), (c) and (d) below have been met with respect to the proposed extended-stay component of the hotel operation. (3) Evidence of all required zoning and development approvals under chapter 26 of the Code of Laws and demonstrated compliance with any conditions of approval. (4) Evidence of a valid business license. (b) Zone district compliance. Extended-stay facilities are allowed only in the following zone districts: (1) Commercial-one (C1) as a special use permit process; (2) Commercial-two (C2) as a special use permit process; (3) Mixed-use commercial (MU-C), and all MUC subdistricts as a conditional use permit process; and (4) Mixed-use-neighborhood (MU-N) as a conditional use permit. The applicant, in addition to a precondition of the issuance of an extended-stay hotel license addendum, must apply for and obtain approval of the relevant special use under the procedures set forth in section 26-114 of this Code. (c) In-room characteristics. The following in-room characteristics are required for all lodging units permitted as extended-stay lodging: (1) Minimum size for entire unit: Three hundred (300) square feet. (2) Minimum size for living room: One hundred twenty (120) square feet. (3) A defined bedroom must be provided separate and apart from other portions of the unit. (4) The following minimum kitchen/cooking facilities are required (but may not be located in the defined bedroom or bathroom): refrigerator, cooktop, dedicated sink, cabinets with cooking/dining supplies. (5) The maximum sleeping occupancy per room or unit shall be two (2) persons per dedicated bedroom. Created: 2025-03-20 15:11:09 [EST] (Supp. No. 74, Upd 1) Page 7 of 8 (6) Personal possessions may not be stored on exterior balconies, interior corridors or in a manner that prohibits adequate movement and ingress/egress within the unit, with the exception on balconies for items such as bikes, strollers, and coolers. (7) Housekeeping must be available, although an additional charge may be made for the same. (d) Common area characteristics. (1) The following common area amenities must be available to the residents of all extended stay lodging facilities: a. Twenty-four-hour desk staffing; b. Prohibition of storage of any personal possessions within shared common areas of the building and/or site; c. Universal wireless internet available included within room charge; d. In-room or common area laundry facilities adequate for number of guests. (2) A minimum of three (3) of the following common area amenities shall be provided at the choosing of the extended stay lodging licensee, subject to the city's review and approval: a. Business center of a size at least one hundred twenty (120) square feet; b. A fitness center of at least three hundred fifty (350) square feet for every two hundred (200) rooms; c. A swimming pool at least fifteen (15) by twenty-five (25) by four (4) feet; d. Meeting areas or conference rooms; e. On-site restaurant or other available food options provided adequate for number of guests. As part of the review process for the extended-stay lodging license addendum, the treasurer may determine that one (1) or more of the foregoing amenities in this subsection (2) is not required, taking into consideration the age, location and size of the hotel property itself, as well as the portion thereof proposed to be devoted to extended stay lodging. (e) Duration of stay. Duration of occupancy in any extended stay lodging unit may be for a period of thirty (30) consecutive days or more. (f) Guest behavior. Persons renting an extended stay unit in a hotel with a valid extended-stay hotel license addendum under this article must be present in the unit at all times during which other persons are also present. In addition, persons renting the unit may not: (1) Sublet the unit to any other person; or (2) Permit occupancy of the unit by any person other than the registered guest or guests. (Ord. No. 1723, § 1, 10-25-21) Sec. 11-569. Implementation schedule. It is the intention of the city that existing hotels within the city be given the sufficient time to make the operational and physical modifications and improvements necessary to satisfy the eligibility requirements in section 11-564. Accordingly, the following implementation schedule for this article is adopted: (1) Existing hotels shall have until January 1, 2022 within which to submit an application and application fee for a hotel license. Created: 2025-03-20 15:11:09 [EST] (Supp. No. 74, Upd 1) Page 8 of 8 (2) The city treasurer shall have thirty (30) days within which to review applications for existing hotels. (3) A hotel, once licensed, shall comply with the schedule to achieve the required CFS metric in subsection 11-564(a). (4) existing hotels shall have until June 30, 2022 to limit the duration of guest stays to less than thirty (30) days, unless the hotel has applied for and received an extended stay addendum under section 11-568. (5) On or before June 30, 2023, and every eighteen (18) months thereafter, the council shall conduct a review of the implementation of this Article and shall consider any amendments deemed appropriate in response to that review. (Ord. No. 1723, § 1, 10-25-21) ITEM NO. 3 Memorandum TO: THROUGH: FROM: DATE: SUBJECT: Wheat Ridge City Council Patrick Goff, City Manager Karen A. O’Donnell, Parks and Recreation Director April 7, 2025 Outdoor Pool Replacement Community Engagement ISSUE: Anderson Outdoor Pool, a beloved community asset since its opening in 1979, has served residents each summer for decades. While the pool received a facelift in 2008, much of its original infrastructure, including its foundation, remains unchanged and is now approaching the end of its functional life. Within the next 3-5 years, the pool will need to be either replaced or closed indefinitely. In 2025, the Parks and Recreation Department is seeking community input on two key questions: (1) Do residents support replacing the outdoor pool? (2) If so, what amenities and features would they like to see in a new facility? PRIOR ACTION: In 2008, the slide and slide tower were demolished and rebuilt, and the family pool was newly constructed. The lap pool remained largely unchanged, except for a completely new west wall. A cement deck was added between the family and lap pools, and small shade sails were installed. Additionally, modifications were made in the pump room to support a second body of water. FINANCIAL IMPACT: Design costs are estimated at $500,000, and construction costs are estimated at $10M to $15M. The Parks and Recreation team has been researching grant opportunities for several months. While there don’t appear to be many grants that fund pool design and construction, the team is planning to apply for an Outdoor Recreation Legacy Partnership (ORLP) grant through Colorado Parks and Wildlife in August of 2025. Public engagement is a major funding criterion and has influenced engagement planning efforts. ORLP is part of the Land Water Conservation Fund (LWCF), which provided funding to build the Anderson Pool in 1977. The site being previously funded by LWCF makes it eligible for additional LWCF/ORLP funding. ORLP can provide higher funding amounts than the standard LWCF funding. Study Session Memo – Outdoor Pool Replacement Community Engagement April 7, 2025 Page 2 BACKGROUND: An audit of the Anderson Pool was completed in March of 2023 by an aquatic planning and design firm, Counsilman-Hunsaker (Attachment 2). The audit included an all-inclusive analysis of all systems and recommends the total replacement of the pool and its related systems. Short-term repairs alone amount to over $600,000 and do not guarantee that the pool will remain operable for an extended period of time. A core team of City staff recently began meeting bi-weekly to discuss engagement strategies and assign various tasks. The Grant and Special Project Administrator is working closely with potential funders to set the team up for success as grant applications become available. The Parks & Recreation Director and City Manager are working diligently to identify potential funding opportunities. RECOMMENDATIONS: City staff recommend utilizing the attached community engagement plan to educate the community and involve residents in decisions related to the future of the Anderson Pool. ATTACHMENTS: 1. Anderson Pool Engagement Plan 2. Anderson Park Pool Audit Report (2023) ATTACHMENT 1 Anderson Pool Community Engagement Plan Core city team members: Recreation Supervisor-Aquatics, Recreation Coordinator- Aquatics, Recreation Coordinator-Athletics and Anderson Building, Recreation Supervisor- Marketing and General Programs, Recreation Manager, Grant and Special Project Administrator, Parks and Recreation Director, Neighborhood Engagement Specialist Campaign Name: Keep Anderson Afloat: Designing a Replacement for Our Outdoor Pool Project Website: https://whatsupwheatridge.com/shared_link/vafz7jh1 Engagement Timeline: April 1, 2025 – August 15, 2025 Project Goals: • Determine if there is significant support from residents for replacing the outdoor pool, understanding that the alternative is closing the outdoor pool indefinitely. • Quantifying community support for different aquatics amenities. • Have we engaged relevant groups through this process, especially underserved and hard-to-reach groups? • Swim clubs, Sun Camp, kids/families, elementary school students, lap lane users, general pool users, non-pool users, etc. Engagement Methods: • Community survey (online and paper versions) • “Share your story tool” on WhatsUpWheatRidge • Comment cards available during tabling • Kids activities • Also considering: open house, focus group and/or resident advisory committee Targeted Outreach: Group Planned Engagement Method City Council Study Session Presentation, Q+A Optimist Club Presentation, Q+A Stevens Elementary Kids engagement activity, Peach Jar flyer Prospect Valley Elementary Kids engagement activity, Peach Jar flyer Everitt Middle Peach Jar flyer Mountain Phoenix Kids engagement activity, Peach Jar flyer Compass Montessori Peach Jar flyer ATTACHMENT 1 Wheat Ridge High School Peach Jar flyer Manning Middle Peach Jar flyer Piranhas + Foothills Swim Clubs Kids engagement activity, flyer distributed at practice Swim Lesson Participants Kids engagement activity, flyer distributed to participants Rotary Club Presentation, Q+A Kiwanis Club Presentation, Q+A Parks and Rec Commission Presentation, Q+A IDEA Committee Presentation, Q+A Sun Camp Kids engagement activity, flyer distributed to families Outside Camps (e.g., Sweet Ridge) TBD, likely kids engagement activity, flyer distributed to families WR Chamber of Commerce Presentation, Q+A Wheat Ridge Business Association Presentation, Q+A Lifeguards Staff training activity General Community Outreach: Date Time Location Notes Saturday, April 5th 9:30am-1:30pm Rec Center Pool Info out at Splash and Search event at WRRC (Memorial Day Weekend date) TBD based on weather Anderson Pool Decide week-before if weather looks promising, not aquatics staff Friday, May 30th 12-3pm Anderson Pool Pool-deck tabling Thursday, June 5th 12-3pm Anderson Pool Pool-deck tabling Wednesday, June 11th 12-3pm Anderson Pool Pool-deck tabling Tuesday, June 17th 12-3pm Anderson Pool Pool-deck tabling Wednesday, June 18th 5:30-8pm Anderson Park Pavilion Performance in the Park ATTACHMENT 1 Monday, June 23rd 12-3pm Anderson Pool Pool-deck tabling Saturday, June 28th 1:30-8pm Anderson Park NE Lot RidgeFest Sunday, July 6th 12-3pm Anderson Pool Not aquatics staff, 4th of July weekend Wednesday, July 9th 9:30am-11am Anderson Park Pavilion Performance in the Park-Kids Performance Saturday, July 12th 12-3pm Anderson Pool Pool-deck tabling Saturday, July 19th TBD Anderson Pool Swim League Meet Carnation Festival TBD Anderson Park TBD, potentially table at this event Tabling Methodology: Table one day during Memorial Day and 4th of July holiday weekends, table one day of the week throughout the summer (Mon-Sun), table at large community events (PIP, RidgeFest, potentially Carnation Festival), table at competitive swim league meet General Community Communications: • Summer Parks and Recreation Activity Guide • May Connections edition • May Wheat Ridge Gazette article • May, June, July, August department e-newsletters • Kickoff email to all WhatsUpWheatRidge subscribers • Yard signs (strategically placed) • Social Media • Considering a postcard mailing Relevant to engagement timeline: Outdoor Recreation Legacy Partnership (ORLP) grants program is through Colorado Parks and Wildlife and will likely be open for applications August 1 - August 31, 2025. Public engagement is a major funding criteria. ORLP is part of the Land Water Conservation Fund (LWCF), which provided funding to build the Anderson Pool in 1977. The site being previously funded by LWCF makes it eligible for additional LWCF/ORLP funding. ORLP can provide higher funding amounts than the standard LWCF program. 1 MARCH 2023 ATTACHMENT 2 AQUATIC AUDIT REPORT for the ANDERSON PARK POOL in WHEAT RIDGE, COLORADO ATTACHMENT 2 2 TABLE OF CONTENTS TABLE OF CONTENTS .................................................................................................................................... 2 A. EXECUTIVE SUMMARY .......................................................................................................................... 3 B. POOL INFORMATION* ............................................................................................................................ 4 C. POOL ITEMS ............................................................................................................................................ 5 1. STRUCTURES AND FINISHES .................................................................................................... 6 2. PERIMETER OVERFLOW SYSTEM ............................................................................................. 9 3. MAIN DRAINS ..............................................................................................................................11 4. INLETS .........................................................................................................................................12 5. POOL ACCESS & ANCHORS .....................................................................................................13 6. POOL MARKINGS .......................................................................................................................14 7. UNDERWATER LIGHTS .............................................................................................................15 D. DECK ITEMS ..........................................................................................................................................16 1. POOL DECK ................................................................................................................................17 2. DIVING BOARDS and WATERSLIDES .......................................................................................18 3. LEISURE POOL FEATURES ......................................................................................................19 E. POOL MECHANICAL ITEMS .................................................................................................................20 1. PIPING AND VALVES .................................................................................................................21 2. PUMPS .........................................................................................................................................22 3. FILTRATION & BACKWASH .......................................................................................................23 4. CHEMICAL TREATMENT ............................................................................................................25 5. CHEMICAL CONTROLLERS .......................................................................................................26 6. POOL HEATERS .........................................................................................................................27 F. OPINION OF PROBABLE COST ...........................................................................................................28 G. ATTACHMENT “A” ...............................................................................................................................29 3 A. EXECUTIVE SUMMARY The ABO Group authorized Counsilman-Hunsaker to provide a swimming pool audit at the Anderson Park Outdoor Pool Facility in Wheat Ridge, Colorado. The Lap Pool, Leisure Pool, and Slide Splashdown Pool were constructed in 2007/2008 as part of a renovation project by the City of Wheat Ridge. Previous to the renovation, the site consisted of a 164’ x 60’ pool constructed in 1979. The 2007/2008 renovation included constructing two new pools “within” the original existing pool. The current lap pool shallow end wall and gutter system were installed as part of the 2007/2008 renovation, but the remaining three lap pool walls and pool slab are original to the 1979 construction. The 2007/2008 renovation also added a leisure pool where the slab was constructed on top of the original 1979 pool slab and the leisure pool walls were newly constructed. The repair and/or replace estimations throughout this report and summarized in the OPC (Opinion of Probable Costs) on Page 28 tends to lean towards consideration of total replacement of the pools and their related systems. As noted within this report, with the exception of the shallow end wall, the Lap Pool structure is 43 years old and liv- ing on borrowed time. Counsilman-Hunsaker was commissioned for this audit to identify items that are substandard or not operating as required, and offer insight for potential repairs if needed. Providing a safe and sanitary environment for the users of the pools is the highest priority for Counsilman-Hunsaker, The ABO Group, and the City of Wheat Ridge. A site visit to the aquatic facilities was performed by Cary Dennis and Daniel Borgatti from Counsilman-Hunsaker on March 2, 2023. The site visit aimed to evaluate the existing outdoor pools and pool mechanical systems and review the aquatic programming needs, wants, and vision for the future of the swimming pools. Two significant pieces of federal regulation have been adopted into law and impact new and existing commercial pools. Approximately ten years ago, the Americans with Disabilities Act (ADA) requires two (2) means of access to the pool itself. The second piece of legislation enacted around the same time was the Virginia Graeme Baker (VGB) Pool and Spa Safety Act. This required specialty anti-entrapment covers at the main drains. VGB covers were in place, but they are believed to be expired as the ones installed only have a rated life of seven (7) years, and part of the law requires their replacement once they've expired. Codes Applicable and Referenced within this report: • ANSI/APSP/ICC-1 2017 • Jefferson County Department of Health defers Pool Regulations to The Colorado Department of Health and Environment—Water Quality Control Division—SWIMMING POOLS AND MINERAL BATHS • Model Aquatic Health Code (MAHC) • National Pool & Spa Institute Applicable Federal Code Sections: • Virginia Graeme Baker Pool and Spa Safety Act (VGB) • ASME/ANSI A112.19.81 • Signed into Law on December 19, 2007 • CPSC Staff Interpretation of Section 1404 issued on June 18, 2008 • Americans with Disabilities Act (ADA) U.S.C. 12101 et seq. Signed into Law on July 26, 1990 The administrative code requirements must be satisfied if a significant modification of the pool is undertaken or if a particular item or piece of equipment is in need of repair. The recommended repairs address all administrative code items identified in this report. Structural Issues/Review: If a pool structural inspection is being considered, Martin/Martin are recommended and have extended experience pool swimming pool structural design. Martin/Martin Consulting Engineers – Investigative Department 12499 W Colfax Ave Lakewood, CO 80215 Phone: 303-431-610 4 B. POOL INFORMATION Lap Pool (per 10-03-07 Drawings) Maximum Length: 82’-2” Maximum Width: 60’-0” Surface area: 4,507 ft² Perimeter: 284’- 4” Linear Feet Depth: 4’-3” to 12’-4” Volume: 313,000 gallons (330,000 calculated) Lanes: Eight (8) 84’-0” Lanes Turnover Rate: 4.22 Hours Design Flow Rate: 1,250 GPM Filtration Method: High Rate Sand Filters Filtration Area: 90.0 ft² Total (Two Filters at 45.0 ft² each) Backwash Rate: 687 to 916 GPM (Per Filter Operation Sheet on the Gauge Cluster Panel) Leisure (Splash) Pool (per 10-03-07 Drawings) Surface area: 2,959 ft² Perimeter: Unknown Depth: 0’-0” (Zero Entry) to 3’-0” Volume: 37,300 gallons Turnover Rate: .99 hrs Design Flow Rate: 625 GPM Filtration Method: High Rate Sand Filters Filtration Area: 45.0 ft² Backwash Rate: 687 to 916 GPM (Per Filter Operation Sheet on the Gauge Cluster Panel) Slide Splashdown Pool (No Accurate Drawings are Available) (NOTE: This pool is tied to the Lap Pool. The overflow weir and the floor sump drain via gravity to wall sumps located in the lap pool deep end wall. The only treated water return is supplied by the slide pump) Surface area: 250 ft² (Approximate) Perimeter: 70’-0” Linear Feet Depth: 3’-6” Volume: 6,500 gallons (Approximate) *All information approximated from field observations of the swimming pool and construction/ renovation documents provided to the Consultant. 5 C. POOL ITEMS 1. STRUCTURES AND FINISHES 2. PERIMETER OVERFLOW SYSTEMS 3. MAIN DRAINS 4. INLETS 5. POOL ACCESS AND ACHORS 6. POOL MARKINGS 7. UNDERWATER LIGHTS 6 1. STRUCTURES AND FINISHES Observations and Comments Based upon the renovation drawings dated 10-3-07, the current lap pool and leisure pool were built utiliz- ing a pre-existing lap pool slab and walls. The preexisting lap pool was constructed in 1979. The top of the pool walls in the new 25 Meter lap area are original and where cut for the installation of the new stainless steel surge weir gutter. The lap pool shallow end wall was added and is doweled into the original pool slab. The main drains in the deep end of the lap pool are also original. The existing leisure pool also utilizes the original pool slab with adapta- tions for new pool walls and main drains doweled into the original pool floor. Renovation drawings note A Skia Swell (Expansive Caulk) was required at all cold joints within the pool. The “Expansive Caulk” note may have been a typo, as Sika Swell and caulk are entirely different products. A com- pression water stop is also noted on the new shal- low end lap pool wall and the leisure pool walls. Compression water stops are notoriously unreliable. The new lap pool shallow end wall is dimensioned at 1’-9” thick. However, the structural steel for this wall is alarmingly deficient. Typical ACI structural requirements for swimming pools requires a mat of structural steel for every 8 inches of concrete. This wall has a #4 hoop bar on 12 inch centers with lat- eral bars that appear to be spaced 18”+ apart. The plunge pool structure for the open flume water slide was not part of the 10-2-07 renovation. Upon inspection, the lap pool and the leisure pool have numerous surface cracks and delaminated plaster. The lap pool surface could not be closely inspected due to water in the pool. However, plaster cracking and separation could be seen from the pool deck. A majority of the leisure pool surface was accessible for inspection. It is important to note that a surface inspection cannot accurately determine if the plaster issues are directly related to structural cracks without removing the plaster. It is also im- portant to note that Diamond Brite Plaster, or any type of aggregate based plaster requires submer- sion for curing, longevity, and durability. Image 3: Lap Pool Expansion Joint Image 2: Cracks In Leisure Pool Finish Image 1: Lap Pool 7 The leisure pool trim tile is poorly installed in numer- ous locations. Uneven surfaces, cut tile with chipped and sharp edges (See Image 5) along with missing grout and pool plaster infilled into the grout joints (See Image 5). The lap pool expansion joint, wall target, and lane line tile appear to be in adequate condition. Howev- er a close inspection could not be obtained due to water in the pool. The expansion joint tile (See Im- age 3) was closely inspected and the grout joints were filled with Diamond Brite plaster. The caulk joint appeared to be intact, but shows areas of wear. Recommendations: It is recommended to test both the lap pool, and the leisure pool for water loss. Pool staff noted that both pools leak and the leakage in the leisure pool is ex- cessive. Testing the pools will need occur in the off season. Pool piping will need to the plugged/capped at the pool locations to isolate the pool structures, Then, the pools will need to be filled and tested per the procedure outlined in Attachment “A”. If the pool structures are not water tight, repair costs could be exurberant. Short Term: Water Testing Pool Structures Estimate: $15,000. If the pool structures are leaking, the locations of the leaks will need to be pinpointed. This is included in the estimated cost listed above (Water Testing Estimate). Once the locations of the leaks are found, the pool plaster will need to be removed to allow access to the pool concrete. Additionally, oth- er areas where the plaster cracking should be re- moved to inspect the pool concrete to verify the concrete does not have structural issues. Verifica- tion and procedures of concrete repair and/or re- placement with need to be determined by a structur- al engineer. Short Term: Structural Inspection Estimate: $8,500 The Diamond Brite Plaster finish in both pools is in adequate condition with multiple cracks and mild delamination. The zero entry to leisure pool is in Image 6: Leisure Pool Inlet Tile Image 5: Leisure Pool Zero Entry Tile Image 4: Leisure Pool Zero Entry 8 Recommendations Cont’d: the Diamond Brite Finish. The immediate need is to replace/resurface the leisure pool zero entry to avoid potential slip & falls. The areas of Diamond Brite that have delaminated from the pool concrete need to be replaced with a bond coat and new Dia- mond Brite. New Diamond Brite Finishes should be budgeted for within the next 3 to 5 years, pending the life of the existing finishes. Short Term: Re-Coat the Leisure Pool Zero Entry with Slip Resistant Epoxy Paint OR Epoxy Filler with Slip Resistant Aggregate Similar to RockHard. Zero Entry Re-Coating Estimate: $58,000 Short Term: Tile specifically at the zero entry to the leisure pool needs to be replaced. Elevations need to equalized eliminating any uneven surfaces and cut or timed tile. Zero Entry Trim Tile Replacement Estimate: $24,000 Short Term: Numerous tile locations appear to have missing grout or the grout joints are filled with Diamond Brite Plaster. It is recommended to re- move the exiting grout and/or plaster fill in the tile grout joints and replace with epoxy grout. Tile Grout Replacement Estimate: $15,000 Short Term: For tile areas that were submerged or snow covered (Lane Lines), if broken tiles are pre- sent they should be replaced. Hopefully attic stock is available. If not, new tile will be required. New Tile & Grout Replacement Estimate: $65.00/sq ft. Long Term: Replaster All Pools Estimate: $225,000 Image 9: Leisure Pool Stair Entry Tile & Plaster Image 8: Leisure Pool Zero Entry Tile Image 7: Leisure Pool Zero Entry Plaster and Tile. 9 2. PERIMETER OVERFLOW SYSTEMS Observations and Comments As noted in the structural section of this report, three of the four 25-Meter lap pool walls were modi- fied from the original 50-Meter+ pool built in 1979. The fourth wall (shallow end wall) is a new wall. Modifications are based upon drawings dated 10-03 -07. The modified lap pool walls included removal of the top of the original pool walls and the addition of a stainless steel gutter system with an integral sup- ply tube. The supply tube has small 1/2” holes evenly spaced around the perimeter of the gutter to distribute treated water back into the pool (See Im- age 11). The limitations with pressure tube stainless steel gutters is that treated water rarely reaches the deeper water, often causing varied chemical level readings and cloudy water in the deeper areas. Alga flumes can also be an issue if not. Many states re- quire wall inlets evenly spaced between the water level and pool floor or floor inlets. Or a combination of both. The current Model Aquatic Health Code notes the following: 4.7.1.3.1.3.1—For Pools greater than 50 ft wide (15.2m), floor INLETS shall be required. 4.7.1.3.2.1 — Floor INLETS shall be spaced to effectively distribute water throughout the pool. While the current pool would likely be grandfathered to current pool codes. Pool staff relayed that there are suspected issues with welded joints in the gutter system. If welding seams on stainless steel gutters are not properly passivated after welding, they will begin to corrode and potentially fail, if not properly treated. The leisure pool utilizes a skimmer overflow system that drains via gravity to a balance/surge tank locat- ed below the pool deck in front of the filter room. This is uncommon as skimmers are designed for direct suction since they are sporadically placed versus a continuous overflow gutter system. Health Codes do not dictate a flow requirement, other than a manufacturers recommended flow (per MAHC 4.7.1.5.3). Skimmer manufactures recommend 30 to Image 12: Gutter Design Drawing 10-03-07 Image 11: Stainless Steel Gutter Inlet Port Image 10: Stainless Steel Gutter 10 50 gpm per skimmer. With six (6) skimmers and the zero entry trench tied into a single 8 inch line that drains to the surge tank, the maximum flow via gravity is 465 gpm. Industry standards are the over- flow should handle a minimum of 80% to 100% of total recirculation flow, Current Colorado State Code requires a minimum of 50% of the recirculation flow. With the 8 inch line the overflow is at 74%.of the re- circulation flow. Four (4) of the six (6) skimmers have cracks and all skimmers appear to be poorly installed. There are no details on the 10-03-07 drawings indicating how the skimmers were to be installed. Typically, skim- mers are encased in concrete with structural steel (rebar) surrounding the skimmer body. Pool staff relayed that there is/are a major leak(s) in the skim- mer system The slide splashdown pool has a grate at the top tread of the stair entry that runs the entire width of the pool (See Image 15). Pool staff relayed that the piping from this grate drains into the lap pool. Draw- ings provided do not indicate pipe routing or con- nections from this overflow grate. Recommendations: Short Term: Replace or modify the Lap Pool main drains to achieve VGB Compliance. Replace all six (6) skimmers at the leisure pool and modify the pipe sizes to the surge tank to accommo- date 80% to 100% of the flow rate. Estimate: $125,000 Image 15: Slide Splashdown Pool Overflow Grate. Image 14: Leisure Pool Skimmer Throat Image 13: Leisure Pool Skimmer Body 11 3. MAIN DRAINS Observations and Comments The main drains in the deep end of the lap pool are origi- nal to the 1979 construction of the 50-Meter Lap pool. According to the renovation drawings dated 10-03-07, the deep end main drains were not modified and it is as- sumed the original main drain piping beneath the pool was utilized with a new connection point between the pool and the filter room. The leisure pool main drains were installed with the 10- 03-07 renovation and new piping was utilized for these drains (See Image 17). The slide plunge pool main drain was covered in snow and a visual inspection was not possible. Renovation drawings dated 10-03-07 indicate a main drain modifica- tion that was not installed as part of the renovation. Addi- tionally, wall sumps in the lap pool were also noted for modification as part of the renovation, although they were not installed. The 14 inch interconnecting drain line between the slide plunge pool and the current lap pool wall sumps is original. The main drains in the lap pool and the leisure pool were submerged and visual inspection could not be accom- plished. Based upon the dimensional data in Image 18, the leisure pool sumps are compliant with current VGB regulations. However, based on the information in image 17 taken from the original pool drawings, the lap pool sumps are not dimensionally compliant. The elevation of the top of the suction pipe must be 1.5X the pipe diame- ter from top of the grate. Therefore, for an 8” pipe, the top of the pipe must be a minimum of 12” below the top of the grate. Pool staff relayed that VGB compliant covers have been installed and were up to date. Recommendations: Short Term: Replace or modify the Lap Pool main drains to achieve VGB Compliance. Estimate: $75,000 NOTE: Other modifications are available, but dimension- al verification is required. Long Term: Replace main drain covers every 10 years based upon current VGB requirements. Estimate: $25,000 for all drain covers Image 18: Original Lap Pool Main Drain Detail Image 17: Leisure Pool Main Drain Detail -01-03-07 Drawings Image 16: Lap Pool Main Drain Detail—10-03-07 Drawings 12 4. INLETS Observations and Comments As noted in the overflow section of this report, the lap pool uti- lizes a stainless steel gutter with a pressure tube return sys- tem. The pressure tube located on the face of the gutter sys- tem distributes treated water back into the pool approximately 10 inches below water level. The supply tube has small 1/2” holes evenly spaced around the perimeter of the gutter to dis- tribute treated water back into the pool (See Image 20). The limitations with pressure tube stainless steel gutters is that treated water rarely reaches the deeper water, often causing varied chemical level readings and cloudy water in the deeper areas. Algae flumes can also be an issue if not. Many states require wall inlets evenly spaced between the water level and pool floor or floor inlets. Or a combination of both. The current Model Aquatic Health Code notes the following: 4.7.1.3.1.3.1—For Pools greater than 50 ft wide (15.2m), floor INLETS shall be required. 4.7.1.3.2.1 — Floor INLETS shall be spaced to effec- tively distribute water throughout the pool. While the current pool would likely be grandfathered to current pool codes. The leisure pool utilizes twenty one (21) floor inlets (based on 10-03-07 drawings) that equally distribute treated water back to the pool. At the time of my review the pools were not opera- tional and many of the inlets were covered with winter water. Pool staff relayed that it is suspected that the supply piping to the leisure pool inlets may be leaking. Recommendations: Short Term: Supply piping to the floor inlets in the leisure pool should be tested for leaks. Leak repairs can be costly and its impossible to pinpoint a specific cost. Estimate Range: $15,000 to $50,000 NOTE: Once leaks are repaired, it is suggested to retest the piping to verify all leaks have been addressed prior to backfill. NOTE: Adding wall inlets to the lap pool to equalize treated water distribution would not be feasible and would be costly. Long Term — Seasonal: Winterizing the leisure pool floor inlet piping should always include removal of as much water as possible, the addition of RV antifreeze into the piping sys- tems, and threaded PVC caps screwed into the inlet body. Estimate: $5,000 Image 21: Leisure Pool Inlet Image 20: Lap Pool Inlet Gutter Pressure Tube Inlet Nozzle Image 19: Lap Pool Pressure Tube Detail—10-03-07 Drawings 13 5. POOL ACCESS AND ACHORS Observations and Comments The lap pool has four (4) means of standard access via ladders located 7 feet from each longitudinal corner of the pool. Pool staff relayed that one (1) pool lift is utilized for ADA accessibility. At the time of our review, the lap pool ladders and ADA lift had been removed for off-season winter storage and placement of the pool cover. The leisure pool has one (1) standard means of ac- cess via a large stairway on the east end of the pool. The Model Aquatic Health Code notes: (4.5.5.4) Wider Than Five Feet Stairs wider than 5 feet (1.5 m) shall have handrails at either side and spaced not more than every 12 feet (3.7 m) apart across the entire stair width. This interpretation indicates that rails are required on both outer edges of the stairs, then spaced a maximum of 12 feet between the two outer rails. If the health dept has not flagged this as an issue, it is assumed the leisure pool is complaint or grandfa- thered according to Jefferson County Codes. The leisure pool does not have a primary means of ADA accessibility. A primary means of access is an ADA lift or a ramp entry with a landing and rails. Recommendations: Short Term: Install a battery powered ADA compliant pool lift to the leisure pool. An extra battery is also recommended. If the lift is to be stored during the off season, a cart for transport is also required. Estimate—Pool Lift w/ Extra Battery $13,500 Estimate—Pool Lift Cart $2,500 Long Term: Additional rails (on north and south sides) should be considered for the leisure pool stairs. Additional wedge anchors would also be required along with grounding of the anchors. Estimate: $8,500 Image 24: Leisure Pool Inlet Image 23: Leisure Pool Stairs and Rails Image 22: Lap Pool Grab Rail Locatfon(s)—10-03-07 Drawings 14 6. POOL MARKINGS Observations and Comments The lap pool has deck mounted tile depth markers and NO DIVING markers. The tile consists of 1” x 1” tile pat- terns that provide 6-inch tall numbers and letters. There are numerous locations where the tile is missing, broken, or delaminated from their base. There are also locations where the markers exceed the allowable distance of 25- feet between markers. Code also requires vertical depth markers. With the stainless-steel gutter there should be vinyl depth makers on the face of the gutter (above water level). These only last a short period of time and typically the need to replaced at the beginning of each season. The slide splashdown pool has only two (2) tile depth markers that are located on the pool deck. These two locations are duplicated on the vertical face of the pool. Additional depth markers are required to meet the re- quired minimal distance requirements of 25 feet apart or less. Additionally, NO DIVING markers are required for depths of five feet or less. The leisure pool has both deck mounted and vertical pool wall mounted tile depth markers. The deck mounted depth markers show wear and tear and are missing grout between the tile joints. There are no depth markers or warning signs on the entire zero entry portion of the pool. Both Jefferson County Health Code and the Model Aquatic Heath Code do specifically define if depth mark- ers are required at zero entries. The MAHC notes that they are not required for wading pools that have a depth of 6 inches or less. But this is not a wadding pool. If this has not been flagged by code review officials, it may not be required per code. However, industry standards typi- cally include depth marker and NO DIVING at zero en- tries. Potential legal arguments could also justify their inclusion. Recommendations: Short Term: Replace lap pool deck mounted depth markers with 8” x 8” non slip depth markers and warning signs. Estimate—$8,800 Short Term: Add vertical vinyl depth markers to lap pool Estimate—$2,000 Short Term: Add zero entry depth markers and warning signs and new 8” x 8” non slip depth markers to leisure pool Estimate—$6,500 Short Term: additional depth markers and warning signs to slide splashdown pool. Estimate: $3,500 Image 27: Leisure Pool Inlet Image 26: Leisure Pool Stairs and Rails Image 25: Lap Pool Grab Rail Locatfon(s)—10-03-07 Drawings 15 7. UNDERWATER LIGHTS Observations and Comments The underwater lights that existed in the original pool built in 1979 were removed per the 10-03-07 renovations drawings. (See Image 29). Oddly, the detail calls for the lamp to be removed and the nich- es to remain in place and to be packed with non- shrink grout. Typically, the niche is removed and the void is filled with water proofing material, concrete, and or grout. Recommendations: It is key to keep a close eye on the original under- water light locations. The disconnected conduit is noted to be filled with caulk, which, over time, will fail. These abandoned light locations can be a po- tential leak point. Image 29: Leisure Pool Stairs and Rails Image 28: Lap Pool Grab Rail Locatfon(s)—10-03-07 Drawings 16 D. DECK ITEMS 1. POOL DECKS 2. DIVING BOARD AND WATER SLIDES 3. LEISURE POOL FEATURES 17 1. POOL DECKS and COPING Observations and Comments Pool decks appear to be in adequate condition. There are locations of shrinkage cracking (See Im- age 30) and minor shifting, but no noticeable struc- tural cracking, heaving or settlement. Pool staff re- ported no slip/falls due to slick surfaces related to the pool deck. Cold joints in the pool deck appeared to have no caulk or fill material which is typical for cold joints. It appears the cold joints were originally poured with- out expansion joints. This is necessary to keep wa- ter from penetrating the joint and damaging the con- crete due to freeze-thaw. Caulk is also missing from the joint between the back of the lap pool stainless steel gutter where the deck concrete meets the gut- ter. The cold joint between the pool deck and the leisure pool coping should also include a could joint. How- ever it appears it was constructed without expan- sion material and a caulk sealant. The leisure pool coping is in poor condition with multiple cracks which can be defined as structural cracking. Based upon the renovation drawings date 10-03-07, no re- bar is present in the cast-in-place coping, making it susceptible to cracking and displacement. Recommendations: Short Term: The concrete pedestal for the 1-Meter dive stand that was previously removed should be demolished and replaced with new decking that is level with the remainder of the pool deck. This item is a tripping hazard and an obstruction. Estimate—$5,000 Short Term: The leisure pool coping should be re- placed. Since the replacement of pool skimmers is also recommended, the poor condition of the exist- ing coping which is integral to the skimmers re- quires the new coping properly anchored to the pool beam with integral rebar. Estimate—$80,000 Long Term: N/A Image 32: Leisure Pool Slide Stair and Rail. Image 31: Leisure Pool Stairs and Rails Image 30: Lap Pool Deep End Deck 18 2. DIVING BOARD and WATER SLIDE Observations and Comments As part of the 2007 renovation, a 1-Meter dive stand with a concrete platform was added to the south side of the deep end of the lap pool. The dive stand has recently been removed, however the concrete platform remains. This is an obstruction for deck traffic. This item is also noted in the Pool Deck and Coping portion of this report. The large water slide was installed as part of the 2007 renovation, although the layout of the slide is dramatical- ly different than the slide shown on the 10-03-07 renova- tions drawings. Pool staff relayed the concern regarding the out of plumb steel support columns. The interior fin- ish of the slide is in good condition with the exception of the slide seams that need to be re-caulked. The exterior of the slide fiberglass is showing its age and is due for a new resurfacing or epoxy coating. The steel columns, yokes, and hardware appear to have minimal corrosion. Bi-yearly inspections by maintenance staff are always recommended (prior to the start of the swim season and the end of the swim season). The slide riding surface should be waxed at the beginning and end of each swim season and the fiberglass seams should be re-caulked at the beginning of each season. The small slide at the leisure Pool is in poor condition. Uneven seams, a worn riding surface, disintegrating stair railing leading to the slide platform, delaminating safety padding, and a dangerous raised concrete shelf utilized for the slide support. Recommendations: Short Term: The concrete pedestal for the 1-Meter dive stand that was previously removed should be demol- ished and replaced with new decking that is level with the remainder of the pool deck. This item is a tripping hazard and an obstruction. Estimate— See Pool Decks and Coping Short Term: Schedule yearly riding surface waxing and seam caulking. Estimate—$8,000 Short Term: Remove the small leisure pool slide, slide concrete stair and platform, padding, and railing. Estimate—$30,000 Long Term: Epoxy coat the exterior surface of the fiber- glass Estimate—$23,500 Image 35: Water Slide Interior Seam Image 34: Water Slide Support Columns Image 33: Concrete Platiorm from Removed Dive Stand 19 3. LEISURE POOL FEATURES Observations and Comments At the time of our review, all of the raised features had been removed and stored for winter. The deck level fea- tures had been winterized. Pool staff relayed that many of the current features are worn out and/or non- functioning. The piano feature (See Image 37) has not functioned for many years. The Water Odyssey Control- ler installed during the 2007/2008 renovation is also non- functional. Pool staff also relayed that there are concerns that the feature piping routed from the filter room to each pool feature may be leaking. It was stated that it it uncertain which feature or pipe(s) is/are suspect. But it is feared that the feature piping may be contributing to the rapid water loss. The pressure testing of “all” pool piping is recommended in the “Piping and Valves” section of this report. Please refer the Image 38. A new feature has been pur- chased by the city and will be installed prior to the 2023 swim season. Recommendations: Short Term: Replace the piano feature in the zero entry with a feature (or features) that will equal flow require- ments. This replacement should coincide with the zero entry surface replacement. Estimate— $25,000 Short Term: Pressure test all leisure pool feature piping. Estimate— Refer to the “Piping and Valves” section of this report. Long Term: Epoxy Paint all above grade (functional) features every 3 to 4 years. Estimate— $20,000 Long Term: Above grade pool features tend to have a five (5) to seven (7) year life span. It is recommended to budget for replacement Estimate—$30,000 to $50,000 Image 38: New Leisure Pool Features. Image 37: Leisure Pool Piano Feature Image 36: Leisure Pool Deck Mounted Feature Locatfon. 20 E. POOL MECHANICAL ITEMS 1. PIPING AND VAVLES 2. PUMPS 3. FILTRATION AND BACKWASH 4. CHEMCIAL TREATMENT 5. CHEMICAL CONTROLLERS 6. POOL HEATERS 21 1. PIPING and VALVES Observations and Comments Based on renovation drawings dated 10-03-07, all below grade, balance tank, and filter room piping for the leisure pool is Sch 80 piping. For the lap pool, all below grade (with excep- tion of the pre-existing main drain piping) balance tank, and filter room piping is Sch 80. Since no construction drawings are available for the slide splashdown pool, it is assumed the interconnecting piping with the lap pool is Sch 40. Pool staff relayed that the leisure pool loses a significant amount of water on a daily basis. Pool staff also reported that the lap pool also loses water. Since the pools do not have un- derwater lights, it is safe to assume that the water losses can be largely contributed to issues related to pool piping. Howev- er, as noted in the structural portion of this report, it is recom- mended that the pool structure is water tested for potential leakage via a water tightness test. At the time of our review the pool recirculation systems were not operational due to off season winterization. The piping sys- tems within the filter and pump room are uniquely designed with numerous operational challenges. Standard industry prac- tice is to always have recirculation pumps in the same room as the filtration systems for operational safety and simplicity. Ad- ditionally, access to the pump pit requires stepping on or over recirculation piping, which is a safety hazard. There are valves within the filter and pump rooms that are over 7 feet above finished floor. Valves over 7 feet above the floor should have chain operators to avoid operators using a ladder to adjust. Pool staff relayed that the balance tanks for each pool do not have modulating float valves. Without float valves, the balance tanks serve no purpose. Additionally, the orientation of the piping within these tanks can be con- tributing factor to excess air entering the piping systems. At the time of our inspection access to these pits was not available. Recommendations: Short Term: Pressure test all below grade recirculation piping, including interconnecting piping between the splashdown pool and the lap pool. Estimate—$10,500 Short Term: Add Modulating float valves to the balance tank for each pool. Estimate—$12,500 Long Term: Provide safe access to the pump pit via a safety ladder with rails or a short catwalk. Estimate—$5,500 Add chain operators to each valve 7 feet or more above the finished floor. Estimate—$6,800 Image 41: Leisure Pool Feature Header Piping. Image 40: Leisure Pool Supply Piping with Heater and Chemical Connectfons. Image 39: Filter Room Piping and Pumps. 22 2. PUMPS Observations and Comments The lap pool recirculation pumps (two) are vertically mounted end suction 15 HP 60 TDH pumps recircu- lating 625 gpm each. The leisure pool recirculation pump is a self-priming EQ Series 15 HP 60 TDH Pump with an integral strainer. There are two feature pumps for the leisure pool. Both pumps are self-priming EQ Series pumps with integral strainers. The first feature pump is a 10 HP 45 TDH pump with a 530 GPM flow rate. The sec- ond is a 15 HP 60 TDH pump with a 625 GPM flow rate. No pumps are anchored to their housekeeping pads as required by manufacturers recommendations. (See Image 42) Strainers for the lap pool recirculation pumps are not properly supported. (See Image 43) The compound and pressure gauges for all pumps are either missing or non-functioning. (See Image 44) Recommendations: Short Term: Anchor all pool pumps to housekeep- ing pads. Estimate—$2,500 Short Term: Add concrete support pad for Lap Pool strainers. Estimate—$2,500 Short Term: Replace all compound and pressure gauges, petcocks, and shutoff valve on all pumps. Estimate—$3,800 Long Term: N/A Image 44: Non-Functfonal Compound Gauge Image 43: No Support Under Lap Pool Strainers Image 42: Pool Pumps Not Anchored to Housekeeping Pad 23 3. FILTRATION and BACKWASH Observations and Comments The lap pool has two (2) 60” x 84” horizontal high rate sand filters that filter the approximate 330,000 gallons of water every 4.4 hrs with a flow rate of 1,250 GPM and a filter rate of 13.65 GPM/SF. Code requirement and in- dustry standard for filter rate is 15.0 GPM/SF. The leisure pool has one (1) 60” x 84” horizontal high rate sand filters that filter the approximate 37,000 gallons of water every 1.0 hrs with a flow rate of 626 GPM and a filter rate of 13.88 GPM/SF. Both filter systems meet health code requirements and industry standards. However, there are issues that need to be addressed. Filter backwash: The backwash systems for both pools tie into a single 10 inch pipe that discharges into a drain pipe wrapped in plastic to prevent splash-out in a sepa- rate room, making it impossible to monitor. Secondly, there is no backwash flowmeter, making the monitoring of the required flow rate range impossible. The back- wash flow rate range posted as 687 to 916 gpm on each filter placard must be followed. Additionally, once the flow rate is set, the backwash flow adjustment valve han- dle (wheel) should be removed. Disturbing the filter bed with back pressure is a necessity when backwashing a filter. Without these items, it is unlikely that proper back- washing is taking place. Filter manway hatches with win- dows allows a visual of the filter bed during backwash. The current lap pool and leisure pool filters utilize a hose bib fitting as a pressure relief system on each filter (See Image 47). This is dangerous and could potentially dam- age the filter or someone standing near the filter. Each filter should have a pressure relief valve mounted at the top of the filter with a manual bypass. The pressure relief valve automatically releases trapped air within the filter. The piping from the air relief system and manual bypass should routed to the nearest floor drain, which unfortu- nately is in the adjacent pool pump room. Pool staff relayed that the filter sand had recently been changed. Typically, filter sand should be replaced every 12 to 15 years on seasonal pools. When replacing filter sand, it is also wise to replace the filter laterals, as they are often damaged during the sand replacement pro- cess. The Influent and Effluent gauges for both filter system gauge panels are broken and do not provide accurate pressure read- ings. The tubing connections locations for each gage needs to be relocated. Image 47: Hose Bib Used for Air Relief. Image 46: Gauge Cluster for the Lap Pool Image 45: Lap and Leisure Pool Filters 24 FILTRATION and BACKWASH—Cont’d Recommendations: Short Term: Add backwash flowmeter to backwash piping and adjust valving to reflect required back- wash flow rates. Estimate—$2,500 Short Term: Add manway ports with observation glass to each filter to allow visual acknowledgement of filter backwash sand displacement. New port gas- kets should also be installed. Estimate—$8,500 Short Term: Add automatic air relief systems with manual bypass and all associated sch 80 piping to floor drain or backwash funnel for lap pool and lei- sure pool filter systems. Estimate—$10,500 Short Term: Replace influent and effluent gauges and associated tubing on lap pool and leisure pool filtration systems Estimate—$6,000 Long Term: Replace filter sand every 12 to 15 years. Estimate—$15,800 Image 50: Leisure Pool Filter Supply and Return Piping Image 49: Lap Pool Return Piping and Chemical Connectfons Image 48: Backwash Piping and Lap Pool Filter Supply Piping 25 4. CHEMICAL TREATMENT Observations and Comments The lap pool and leisure pool both utilize individual calci- um hypochlorite feed systems to provide the chlorine treatment for each pool. The feed systems are manufac- tured by Pulsar and utilize dry chlorine pellets. The Pul- sar systems utilize a closed system design for briquette storage tank and spray chamber with a wash down sys- tem that is initiated by a signal sent from the chemical controller for each pool. Calcium hypochlorite is a class 3 oxidizer that requires limitations in storage and fire rat- ings. A maximum of 200 lbs. of calcium hypochlorite can be stored in a single room, which includes the inside of each feeder system. The pH control is maintained via a C02 feed system uti- lizing National Line NCS-CF-CO2 Feeders for each pool. These systems have a maximum flow rate of 30 SCFH. (See Image 53). Recommendations: Short Term: Currently, pool staff is satisfied with the current chemical feed systems and no modifica- tions are recommended. Long Term: N/A Image 53: Co2 Tanks used for pH Control for both pools Image 52: Lap Pool Chlorinator Image 51: Leisure Pool Chlorinator 26 5. CHEMICAL CONTROLLERS Observations and Comments The lap pool and the leisure pool both utilize a ded- icated BecSYS 5 Chemical controller for each pool. At the time of our review, one controller was missing due to repairs. Pool staff relayed that the current position of the controller makes reading the controller monitor diffi- cult. Ideally, the monitor should be mounted at the eyelevel of pool staff. Typically, we see installations where the monitor is 5’-6” to 6’-0” AFF. Both controllers are lacking a flow switch (See Im- age 56). A flow switch is necessary to monitor sys- tem flow. When the pool recirculation pump is shut down or loses power, the lack of flow through the flow cell sends a signal to the controller to discontin- ue chemical feed. Recommendations: Short Term: Add a particulate strainer or a Y- Strainer on the intake side of the flow cell for each controller Estimate—$2,500 Short Term: Add a flow cell to each chemical con- troller. Estimate—$3,500 Short Term: Always keep extra sensor probes in the event a probe failure occurs at an inopportune time. Estimate—$1,200 Long Term: N/A Image 56: Flow Cell Recommendatfon Image 55: Probe Chamber for Leisure Pool—No Flow Cell Image 54: Chemical Controller for Leisure Pool. 27 6. POOL HEATERS Observations and Comments The primary heating system for both pools is a gas- fired central boiler feeding heat exchangers for both pools. Each pool has a dedicated heat exchanger. An older Raypak Pool heater is also provided for supplemental heat for the pool water. Pool staff relayed that the heat exchanger is of questionable size. Based on the pool volumes and the temperature demands during early and late sea- son weeks the current primary and supplemental heating systems should provide adequate heat out- put. Of course below average temperature dips dur- ing these times periods can have a significant im- pact on capabilities of these systems. Many of the pool heating system valves are located as such that they are difficult to adjust without a lad- der. Typically, when valves are located over 7-feet above a finished floor, a chain operator installed to assure the valve can be safely adjusted without the use of a ladder. Recommendations: Short Term: Add chain operators to all valves locat- ed over 7-feet above finished floor OR re-rout piping so valve adjustments can be made without the use of a ladder. Estimate—$6,000 Long Term: If the current boiler is original to the 2007/2008 renovation, it is nearing the end of its life span. Budgeting for future replacement should be accounted for, Estimate—$175,000 Image 59: Leisure Pool Heater Piping Image 58: Gas Boiler for Lap and Leisure Pool Heat. Image 57: Pool Heater for Supplemental Heat. 28 F. OPINION OF PROBABLE COST The following opinion of construction cost addresses the items identified in this report needing repair, replacement, or renova- tion in association with the upcoming renovation. 29 G. ATTACHMENT “A” WATER TIGHTNESS TEST PROCEDURE A. This test applies to the Lap Pool, Leisure Pool, Splashdown Pool, and both Surge Tanks. The water tightness test shall be completed prior to the application of any new pool finishes. All pool piping should be capped or plugged during this test. B. Water Tightness Test Procedure 1. Fill: Fill and then isolate each pool. The water tightness test shall begin after the vessel has been filled for a mini- mum of three (3) days. During the filling, all outlets shall be monitored for water tightness and all concrete joints shall be monitored for any visible leakage. If any visible leakage from the vessel is observed, the condition shall be corrected prior to the start of the test. 2. Evaporation/Precipitation Measurement Procedure a. Fill a floating, restrained, partially filled, calibrated, open container with water and allow the container to float within the pool during the testing period. This will be used to measure evaporation and precipitation. 3. Measurement a. On a separate sheet of paper draw a sketch of the pool. Measurements shall be taken at the pool. Multiple test points with averaging are recommended for vessels which will be exposed to wind. Document the sepa- rate findings on the chart below. Repeat the measurements and document every 12 hours for a total of three (3) days. The General Contractor shall check the pool for water loss with the Architect/Engineer or Owner’s representative every 12 hours. Provide photo documentation of each measurement with the completed water tightness report. 4. Total Loss = 7.481 x Structure Surface Area (SF) x Total Water Loss per Day (FT) – Evaporation per Day (FT) + Precipitation per Day (FT) Day #1 = Day #2 = Day #3 = Total Allowable Water Loss: Total Gallons: __________ (0.1%) x 0.001 = _____ Allowable Loss Pan Depth Per 24 Hrs. Pool Measurements Lap Pool Leisure Pool Splashdown Pool Surge Tanks Pan Measurements 12 Hrs. 24 Hrs. 36 Hrs. 48 Hrs. 60 Hrs. 72 Hrs. 30 G. ATTACHMENT “A” - Cont’d 5. Repair a. The allowable leakage rate for an unlined pool structure shall not exceed 0.1 percent of the total water volume in a 24- hour period. (Example: 0.001 x 200,000 gallon pool = 200 gallons per 24 hour period.) This excludes the loss/addition of evaporation/precipitation. 6. Absorption a. Waiting 3 days after the initial water fill will allow the concrete to absorb water and shall be sufficient to minimize the effect of absorption on the test results. 7. If leaks are detected, contact a qualified pool contractor to provide an approach, procedures and cost for pool repairs.