HomeMy WebLinkAboutStudy Session Agenda Packet 04-06-15STUDY SESSION AGENDA
CITY COUNCIL
CITY OF WHEAT RIDGE, COLORADO
7500 W. 29th Ave.
Wheat Ridge CO
April 6, 2015
6:30p.m.
Individuals with disabilities are encouraged to participate in all public meetings sponsored by the
City of Wheat Ridge. Call Heather Geyer, Administrative Services Director at 303-235-2826 at
least one week in advance of a meeting if you are interested in participating and need inclusion
assistance .
.1. Staff Report(s)
a) Granicus Software Renewal
b) Code Enforcement Strategies Update
2. Parks and Recreation Master Plan Presentation
~ Zoning/Setback Requirements in East Wheat Ridge
4. Citizen Survey
~ Elected Officials' Report(s)
ADJOURNMENT
Continuance of Granicus Services Renewal
March 26, 20 15
Page2
other content (for example task force meetings, Wheat Ridge Top of the Hour videos) are
uploaded to the Granicus server and avai lable for public viewing.
Annual Renewal Request
In the past, the City has renewed its service contract with Granicus on an ammal basis. The City
uses PEG fees that are part of the City's franchise agreement with Comcast. The City receives
approximately $40,000 in PEG fee funds annually and these funds may only be utilized to
support equipment, software and maintenance associated with the operation of Channel 8. PEG
fee funds are accounted for in the General Fund reserves as PEG fee designated reserves and
therefore require a supplemental budget appropriation to expend. The City funds the community
bulletin board, scheduling software and video streaming software with PEG fee funds.
Multi-year contract
The March 23rd staff request was for a three-year contract with Granicus for a total amount of
$42,436.08. Again, it is important to note that this total amount was requested for a three-year
period for fiscal years 2015, 2016, and 2017. While staff negotiated this multi-year agreement,
multi-year contracts always acknowledge that funds are contingent upon City Council approval
of the annual budget. Pending discussion ofthi item at the April 6111 Study Session, the City
entered into a two-month service agreement with Granicus for $4,477.80.
The table below provides a historical breakdown of the Granicus annual licensing fees:
Granicus Annual
Year Licensing Amount Dollar Increase
2009 $6,170.70 Contract for July -December 2009
2010 $12,533.40 No contract increase, first year annual
contract
2011 $12,533.40 No contract increase
2012 $12,533.40 No contract increase
2013 $12,533.40 No contract increase
2014 $13,733.40 Price increase of $1 ,200
2015 $13 ,733.40 No price increase
Sole-source Purchasing
In following the City purchasing policy, staff researched video streaming software systems in
2009 and justified Granicus services as sole-source. Staff is approached by vendors throughout
the year who provide similar video streaming services. Staff asks for quotes and compares
pricing with Granicus. To date, staff has not found a comparable software service that would
warrant the service no longer meeting sole-source justification. Additionally, Granicus offers a
legislative management system that the City currently does not subscribe to but will be able to
utilize as the City moves to a more dynamic paperless packet. City staff has long been interested
in utilizing this technology, however, could not justify adding this component to current video
streaming service when paper packets were used for City Council meetings. Given the City
Council support and direction for use of surface tablets in 2014 and PDF packets, there is greater
opportunity to explore this increased functionality.
Continuance of Granicus Services Renewal
March 26, 2015
Page 3
Other benefits of the Granicus service include the following:
• Limited staff support -the software does not require daily or weekly staff support. The
City is notified of system upgrades and staff may be required to troubleshoot or resolve
system outages that are the result of power outages at City Hall. The system requires no
more than two hours of the contract videographer's time per month.
• Cutting edge technology -the video streaming software is a dynamic technology and
Granicus is a leader in providing this service.
• Unlimited bandwidth and storage (archives on the City's Granicus system date back to
2009)
• On-site media server -this allows staff to trouble shoot and reset the server if necessary
or work with Granicus staff remotely to fix any service issues.
• Viewership analytics -the City can access this information when needed
• Simplified media management -eliminates manual labor involved in archiving files
• Dynamic agenda functionality -viewers can click on the agenda item and view the
meeting at that point without having to fast forward through a meeting archive to find
content.
Channel 8 Production Quality
At the March 23rd City Council meeting, some concems were raised by City Councilmembers as
to production quality of City Council meetings. Again, the production quality issues raised are
not a result of the Granicus system. The "grainy" appearance of Channel 8 is primarily the result
of outdated camera equipment. There are three cameras in the Council Chambers that have very
limited functionality. Additionally, lighting has been a concem raised in the past which reduces
production quality. In addition to the age of our current cameras and inadequate lighting,
Channel 8 is a SD chrumel (Standard Definition). Currently we are negotiating with Comcast for
our franchise renewal in which we are requesting HD channels (High Definition). Upon
franchise approval, in 2016 the City will move forward with implementing use of an HD channel
but will also likely need to keep an SD channel. For viewers who have HD TVs the viewing
quality will be improved. However, if we broadcast solely off of ru1 HD chmmel we could
potentially impact viewing quality for those who do not have an HD TV. This is a technical
issue that staff is currently evaluating.
Council Chambers Audio Vi deo Equipment Upgrades
Staff identified the need to make upgrades to the Council Chambers audio video (A V) several
years ago; however, in light of the recession, funding upgrades to the A V equipment was not a
priority. Since 2007, staff has replaced equipment when necessary but has not had the
opportunity to take a comprehensive look at upgrading equipment until2014. Therefore, late in
2014, staff issued a Request for Proposals (RFP) seeking bids for Council chambers A V
equipment upgrades. Unfortunately, the City did not receive any bids for this RFP. Staff is
cun·ently examining the scope of the original RFP and detennining the best way to reissue an
RFP for the needed improvements. The lack of response may stem from needing to separate the
acquisition of new equipment from construction. Staff plans to move forward with re-issuing an
RFP this year or in early 2016. In addition to lighting and cmnera upgrades, staff has identified
several other needed improvements such as:
• Increased sound performance between Cow1cil Chambers and the Court Room
• Projection capability in the Court Room for overflow meetings
Continuance of Granicus Services Renewal
March 26, 20 15
Page4
• Replacement of the voting board
• Changing the placement of the podium to the center of the Council dais
• Automated lighting system where staff or the A V tech would not need to flip light
switches in the back of Council Chambers
• Addition of a document camera that would allow staff and guests to more easily refer to
planning documents
Channel 8 Functionality Issues
Periodically, the City experiences functionality issues with the Channel 8 software and
equipment. It is important to keep in mind that Channel 8 is an integrated system made up of the
following:
• Equipment (cameras, lights, computer which runs the software identified below)
• Comcast Equipment (Comcast maintains equipment that controls the Channel 8 feed to
the public who subscribe to Comcast Chatmel 8)
• Community Bulletin Board (Symon software) this is the software that provides the
rotating slides advertising City programs and community events
• Granicus (video streaming software) this is the software that provides live and on-
demand viewing access to City meetings and Channel 8 content
• Dyco (scheduling software) this is the software that the contract videographer uses to
schedule programming i.e., when City Council meetings are rebroadcast etc.
In late 2014 and early 2015, the City experienced issues with the community bulletin board
system that resulted in service interruptions. Additionally, the City has experienced Comcast
outages that interrupt Channel 8. This type of outage would interrupt the live on-demand
viewing of a City meeting. The only time content, via the Granicus system, would not be
accessible is when the Granicus server is down. The last time we had a service interruption was
during the upgrade ofthe Granicus server in 2012. There are times throughout the year when the
City has had sound or volume issues with Channel 8. This is often a combination of our volume
levels or it can be the result of Comcast equipment issues.
Staff support to Channel 8 is provided by the City's contract videographer Jesse Johnson,
Administrative Services Director Heather Geyer, and the Information Technology staff as needed.
Overall, the Granicus service outlined in this memorandum is just one of several components of
the City's overall Channel 8 system. It is however a critical component to making Channel 8
programming accessible to the public and supports the City's transparency efforts. Given the
limited budget and staffing resources available, the use of the Granicus service has enhanced the
City's Channel 8 program.
Please contact me if you have any questions at 303.235.2826.
/lung
Staff Report: Code Enforcement Strategies
April 6, 2015
Page2
Neighborhoods
Staff is recommending focusing on two residential neighborhoods in Council Districts II and IV,
(map is included in PowerPoint), based on a review of qualitative and quantitative nuisance code
data, and the belief that efforts in these areas could result in measureable improvements to the
neighborhoods, including reductions in nuisance code complaints, crime and traffic issues.
Similar to the East Wheat Ridge Project, staff recommends that a branding name be designated
for each area that gives the neighborhoods a sense of identity and belonging.
The District II project is a residential neighborhood with boundaries of Harlan Street to Pierce
Street, and W.44th Avenue toW. 48th Avenue. This area would be called the Clear Creek Station
Project, in recognition of a historical street car transfer house that was formerly located at W.
48th Avenue and Teller Street.
The District IV project is a residential neighborhood with boundaries of Brentwood Street to
Garrison Street, and W. 44th Avenue to 1-70 Frontage Road South. This area would be called the
Clearvale Neighborhood Project, which is one of the largest subdivisions in the area and dates
back to 1955.
Commercial Project
As previously discussed, staff is recommending the commercial project focus on W. 44tl1 Avenue
from Harlan Street to Wadsworth Boulevard for two reasons:
• Significant attention has been, and is currently, focused along W. 38th Avenue, as well as
the Wadsworth and Kipling corridors.
• TheW. 44th Avenue corridor serves as the southernmost boundary for the Clear Creek
Station and Clearvale projects, so including this commercial corridor makes sense from a
problem-solving and resource approach. Staff is recommending that this project be
branded as the East 44th A venue Corridor Project.
Project Strategy
There will be four cross-departmental teams assembled to implement this program. One team
will serve as the overall strategy team for the project, and the other three teams will focus on
implementing strategies in each ofthe identified project areas (see attached flow chart). The
strategy team will consist of the Community Development Director, Public Works Director, the
Police Chief, the Patrol Operations Division Chief, the Community Services Team Supervisor,
assigned planners, and the Crime Analyst. Other staff may be asked to participate on an as
needed basis. The strategy team will meet monthly, and provide broad policy direction to the
project teams, and will provide input or seek direction from the City Manager and City Council.
The three project teams for each of the identified areas of interest will consist of representatives
from the Patrol Operations Division, an assigned CSO, one temporary CSO, a planner, and other
stakeholders as identified. The project teams will be responsible for the day-to-day efforts in
these areas. These teams will meet monthly at a minimum, or as needed.
As mentioned, staff has developed a branding strategy for each of these areas. As staff moves
forward in communicating these projects to citizens and property owners, staff will need elected
officials to assist us in communicating the overall purpose and goals of the project in meetings
Staff Report: Code Enforcement Strategies
April 6, 2015
Page 3
and through educational correspondence. Additionally, the Police Department found it helpful in
the East Wheat Ridge Project to have Councilmembers attend planning meetings with staff and
stakeholders.
Public Outreach and Education
Staff recognizes the importance of educating residents and property and business owners. Staff
is recommending that City Council and/or the Mayor serve as spokespersons for this project.
This is important to the outreach efforts in the neighborhoods and critical in the outreach to
business owners. For instance, Councilmembers Starker and DiTullio assisted with the East
Wheat Ridge Project, attending meetings and appearing at events. Their appearance at meetings
and events proved to be very helpful.
The second part of this plan would be to partner with a marketer to help promote the effort to the
community. This could be a one-time blitz effort, or a monthly effort. Estimated costs for these
approaches would be $1 ,500 for a one-time media effort, or up to $600 a month for a prolonged
media approach.
In summary, staff continues to build the foundation for a problem-solving approach, and is ready
to begin conducting initial assessments and neighborhood outreach. Identifying interested
elected officials is a critical component, and having those individuals participating in meetings
and outreach would be helpful. Staff would appreciate direction from City Council on the areas
and project names for these areas, as well as a marketing approach recommendation.
ATTACHMENTS:
I. January 5, 2015 Staff Report
2. Code Enforcement Strategies Flow Chart
3. PowerPoint Presentation (map included)
DB/ck
StaffReport: Code Enforcement Programs
January 5, 2015
Page2
• Moving the nuisance code responsibilities to the Police Department in 2000;
• The development of an administrative model process to resolve nuisance code
enforcement properties;
• The use of a community policing/problem-oriented approach that included an education
and outreach component to the program;
• The addition of the former Community Development property inspector position to the
Community Services Team; and
• Adding seasonal CSO positions to the team during certain months of the year.
Nuisance code enforcement responsibilities rest primarily with the Police Department's
Community Services Team. This team is responsible for three functions: I) nuisance code
enforcement, 2) animal control and 3) City parks patrol and enforcement. Meeting the demands
of these multiple functions can be challenging, particularly during the spring, summer and early
fall months.
Current Nuisance Code Strategies
Residential nuisance code enforcement comprises the most significant use of nuisance code
resources today. The City's nuisance code enforcement strategy can best be described as
location or place specific, targeting blocks or neighborhoods in areas where the crime rate is
higher than other areas. While the majority of calls for service are generated by citizen
complaint or service requests, there have been proactive efforts over the years. These proactive
efforts include:
• East Wheat Ridge (Sheridan to Harlan St.) Community Policing Project -this
program has focused on east City alleyways, neighborhood cleanup, distressed
neighborhoods within this geographic area, and extra-patrol efforts including
bicycle and vehicle patrols by patrol officers and CSOs based on crime, traffic
and quality of life issues.
• Dumpster Program -This CSO program has identified distressed neighborhoods
in the eastside of the City using anecdotal and actual data. CSOs send out
educational information to the identified area via a flyer, a date/time for a
neighborhood meeting when members of the department can meet with properiy
owners to describe the observed violations, and a date is established to provide a
dumpster(s). Afterwards, an assessment of the efforts is made and any further
violations are handled using the administrative model process.
• Budget -the Police Department has budgeted approximately $20,000 a year in
overtime for Community Oriented Policing projects department wide. A part of
this budget has been used for the aforementioned programs. A small amount of
grant funding has been used for overtime through the Justice Assistance Grant to
pay overtime to police officers and CSO's to patrol and work with distressed
neighborhoods in East Wheat Ridge. In 2014, the City Manager's Office had a
$20,000 budget for community programs. This money was used for a targeted
effort in a distressed area of East Wheat Ridge employing dumpsters, as a means
to help property owners clean up unsightly or poorly maintained properties.
• Seasonal CSO Program -the department hires seasonal CSO's to assist with
nuisance code enforcement and parks enforcement. In 2014, the budget allowed
the department to increase the number of seasonal positions from three to seven
Staff Report: Code Enforcement Programs
January 5, 2015
Page 3
in an effort to be more proactive with nuisance code enforcement and parks
enforcement. There have been two challenges in adding these additional
seasonal CSOs-supervision and training, which has been partially addressed by
creating a Lead CSO position in 2014. Having available vehicles for the
seasonal staff to utilize is a significant concern. An additional vehicle was
requested in the 2015 Budget; however, it was cut from the budget prior to
Council's approval of the final budget.
• Large Item Pickup Program -tills program is offered through the Public Works
Department on an annual basis for residences located within the City. The first
275 Wheat Rjdge residences that register are eligible to have one large bulky
household item picked up. A list of approved large items for pickup can be
found on the City website. Public notice is given regarding the program and
citizens contact the City approved vendor for a pickup.
• Education and Media -the Police and Community Development Departments are
proactive in the use of media to educate the public through the use of the
quarterly Connection's articles, Mayor's Matters, informational brochures and
quick reference handouts on a variety of City building code requirements,
educational flyers utilizing Cody the Code Ranger, the City website, Channel 8
and Top-of-the-Hour videos. Many of the brochures and quick reference
handouts have been translated into Spanish.
• Senior Citizens -the Community Services Team has a resource list to address the
unique needs of senior citizens and can assist in finding resources to address
nuisance code issues.
• Outside Partners -both departments make efforts to utilize community partners
and outside agencies. Examples include Wheat Rjdge 2020, Jewish Family
Services, local churches, Live Well Wheat Ridge, the Jefferson County Housing
Authority and DRCOG.
• Issues Group -Members of the Police, Community Development and Public
Works Departments meet monthly to review current cases and strategize on
responses. It is not uncommon for the cases presented to have multiple
violations that are handled by different departments. These meetings allow for
representatives from each department to discuss specific properties, violations
and to determine next steps that address all issues involving a relevant property.
While the City's efforts regarding commercial code enforcement has been primarily reactive and
in response to citizen or elected officials complaints, the Team does make a concerted effort to
focus on theW. 381h Ave. corridor between Sheridan and Wadsworth prior to the annual
Carnation Festival.
Ordinances and Processes
The Police Department and Community Development Departments reviewed relevant codes and
current processes related to residential and commercial nuisance code enforcement. After
reviewing current ordinances and discussing current strategies, there were no suggestions for
revising or adding to the existing Code of Laws or the administrative model process moving
forward. The current abatement process works effectively and is used as a last resort or when a
significant public safety, health or welfare issue exists.
StaffReport: Code Enforcement Programs
January 5, 2015
Page4
There were no changes suggested for the Administrative Model Process. This process allows for
the efficient disposition of over 97% of the nuisance code enforcement actions taken by the City.
At the conclusion of these meetings, consensus was reached that the City is more effective today
than in the past in addressing nuisance code issues throughout the City. While primarily
reactive, the Police and Community Development Departments have adopted a problem solving
approach and strive to be proactive with the resources available to them.
ALTERNATIVES
Staff recognizes that the long-term success of revitalizing Wheat Ridge is tied directly to the
community's ability to clean up and/or redevelop properties that frustrate residents, deter further
investment and create a climate of fear, disorder and crime. Current conditions require the City
to be strategic in its application of limited resources to making the City more attractive. Having
a strong nuisance code enforcement program coupled with the necessary administrative
resources is critical.
Ideally, the City's code enforcement activities would involve both a "carrot and stick" approach.
This approach would incentivize property owners to reinvest in their properties in order to
achieve City goals.
Staff discussed numerous ideas to be more proactive in its approach to nuisance code
enforcement. These discussions focused on broad ideas that would improve the attractiveness of
the City and the quality of life for its citizens. Staff is aware that our strategies should be
focused and decisions on the need for resources should be data-driven. With that in mind, staff is
recommending a multi-faceted approach, understanding that further direction from Council is
necessary.
Staff discussed the feasibility of adding additional FTE staff to address City Council
concerns. There were many suggestions and strategies discussed; however, staff
determined that adding full-time positions without a specific strategy or program would
not provide the results needed.
At the present time, the Police Department hires seven seasonal positions. These
positions have allowed the department to be more focused in the areas of residential
nuisance code enforcement, as well as parks patrol and enforcement. Adding these
positions without additional vehicles and finding workspace for these personnel to
complete their reports and make phone calls has been problematic.
In reviewing how the City could be more proactive, staff recommends maintaining the
seven positions: five as seasonal and two as non-benefited contingent (contract) positions
in 2015 and beyond. The department has $78,750 budgeted in 2015 for these seven
positions. Hiring two non-benefited contingent positions to replace two seasonal
positions at a salary of$16 per hour to work 30 hours a week for 2015 would require a
budget supplemental in the amount of$27,000. This approach would allow the
department to use these two contract positions to focus solely on nuisance code
Staff Report: Code Enforcement Programs
January 5, 2015
Page 5
enforcement problems in identified problem areas or corridors. These positions would
not be responsible for parks and animal control enforcement. It is staffs opinion that the
additional cost of making these positions part-time, with paid benefits, is costly. This
approach gives the City flexibility to evaluate data and outcomes on an annual basis, and
make incremental changes as necessary.
This approach requires adding one vehicle to the existing fleet. A fully equipped vehicle
was requested in the 2015 Budget. Adding seven additional CSOs, during the busiest
months of the year, taxed the department's current vehicle fleet. Staff is recommending
adding one vehicle, without the animal control cages, to the Community Services Team
fleet. A standard utility truck with no animal control equipment would cost
approximately $35,000 and would meet the needs contemplated with this approach.
APPROACH 2 -Problem Solving Strategic Approach
Staff is recommending that a data-driven approach be utilized to address nuisance code
related issues in residential and commercial corridors. Staff would use data from calls for
service, service requests and observations to target two to three areas in the City that are
in distress (crime, traffic, quality of life). Programs similar to the East Wheat Ridge
Community Policing Project would be utilized to address these issues. This approach
would use the strengths of existing cross-departmental meetings, as well as collaborative,
community outreach programs.
For purposes of discussion, staff recommends identifying two neighborhoods and a
commercial corridor to try this approach in 2015. Staff recommends identifying a
neighborhood in District 2 and District 4, using a data-dtiven approach based on
historical calls for service in these areas. As in East Wheat Ridge, a coordinated
dumpster day would be provided for these problem areas. Additionally, staff
recommends identifying a commercial corridor, i.e. W. 44th Avenue between Harlan
Street and Wadsworth, or Wadsworth between W. 351h and 48th Avenues.
The approach outlined above would be accomplished in 2015 using the two contingent
part-time positions and existing staff resources, as available. Depending on the scope of
enforcement issues that are being addressed (landscaping, storage containers, dumpster
enclosures, outside storage, parking lot surfacing, etc.) staff will need to monitor whether
additional resources are needed to sustain such a program in future years. It may also be
necessary to get further City Council direction on what types of enforcement (as noted
above) are of the highest priority to achieve the City's beautification goals. Staffs intent
would be to report back to City Council in late 2015, with the results of this expanded
code enforcement program as described in Approach 1 and 2, above.
APPROACH 3 -Neighborhood/Commercial Corridor Revitalization Program
The Neighborhood Revitalization Strategy encouraged City Council to focus on strategic
and focused "wins" versus a citywide approach. A strategic revitalization program
allows the City to target available resources to create attractive neighborhoods and
vibrant commercial areas. A more comprehensive commercial code enforcement
program could include a three-pronged approach of: 1) education and outreach 2)
Staff Report: Code Enforcement Programs
January 5, 2015
Page 6
systematic code enforcement inspections, and 3) public and private investment through
the City's capital budget, and grants and loans for private property.
Such a program could be relatively resource intensive. Staff will be better positioned to
define such a program, and identify resource needs after the 2015 trial-period for the
alternatives outlined in Approaches I and 2. For 2015, staff proposes to work with
WR2020, the Wheat Ridge Business Association (WRBA), and other identified
stakeholders to identify existing grant and loan resources that could be made available to
commercial property owners where code enforcement activities are occurring.
For Approaches I and 2 to be successful, ultimately there may be a need to commit
capital funding that the City can make available to incentivize property owners to
reinvest in their property. The City could work with existing organizations (WR2020 or
WRBA) to develop a program and criteria for the use of these financial resources.
RECOMMENDATIONS:
Proactive nuisance code education and enforcement efforts are critical elements in addressing
property decline, and in preserving sound neighborhoods and vibrant commercial corridors.
When used proactively, nuisance code enforcement can assist in identifying, halting and
reversing property decline. Staff recommends moving forward with Approaches I and 2 for
2015. These approaches allow the City to be flexible and focus on problem areas in specific
neighborhoods and commercial areas. This plan gives staff the opportunity to assess challenges
and opportunities from this approach, gather data and provide City Council with infonnation
necessary to make decisions on a more comprehensive approach as envisioned in the
neighborhood/commercial area revitalization program (Approach 3) for 2016 and beyond. Staff
from Community Development, the Police Department, and Public Works will meet monthly to
discuss strategies and outcomes from Approaches I and 2, as well as identify priority issues, and
develop responses to address these issues. Lastly, staff would provide City Council information
on an annual basis regarding the outcomes of these strategic approaches, and recommendations
for changes or additions to this program.
Staff also recognizes that City Council may have specific policy issues, or issues they would like
to see addressed, in this approach. Staff requests additional Council direction as to which types
of commercial code enforcement issues are of the highest priority, such as landscape
maintenance, signs, storage containers, trash dumpster enclosures, parking lot maintenance, or
others. Lastly, staff will continue to look at right-of-way maintenance and stonnwater issues as
they apply to broader code enforcement issues.
ATTACHMENTS:
I. August 4, City Council study session staff memo
DB
Attachment 2
Demographic Summary
• 54.7% of households have income below $50,000
• Median age in Wheat Ridge is 44.6 and is 8 years
higher than national average
• Residents have, on average, lived in Wheat Ridge
over 16 years
• Baby Boomers and older are the largest population
group (51% are 45 or older)
• 23.3% of population considers themselves of
Hispanic origin
.._ 3,000 delivered
.._ 343 returned (Very Good)
.._ +I-5.3 % margin of error
.._ The average length of time respondents have been living in
the community is 16.9 years .
.._ The majority of respondents (roughly 96%) are registered
voters within the City .
.._ Sample respondents have a broad age and household
makeup distribution
)> Analysis shows a good program mix with a variety of youth and adult
recreation program opportunities.
)> Strong emphasis on health and well ness.
)> Outgrowing existing facility capacity for current and future programming
opportunities
)> Program participation has increased significantly over the last 4 years
)> Marketing and communication is a limitation for program growth
• Program Development and Expansion
~ Special Events
• Development of more special events
• Community involvement & partnerships
~ Expanded Program Hours
• After work hours
~ Senior/Baby Boomer
• Develop additional special interest and active programming for seniors
~ Teen
• Create teen programming council
• Communication and Marketing Development and Expansion (ongoing)
~ Addition of direct page links on registration home page
);;-Appoint staff person to coordinate and communicate with City IT Department
);;-Develop off-site program marketing and promotions
);;-Smart phone friendly or user friendly version of the rec guide and website
~ Parks are generally well distributed across the City ~nd close to where people live
~ Neighborhood access* to parks is often limited by major pedestrian barriers such as
busy streets based on a 10 minute walk (1 /3 mile)
*Walkability assessment is generalized and not meant to insure sidewalk availability
or the quality of the walkable access
% of Total Population
[VALUE] •· 10 min Walking Access
Greater than 10 mi
Walking Access
);;> Signature parks (Prospect and Anderson) should be master planned and
evaluated for current vs future use
).> Anderson pool and bath house
Survey indicates desire for Community Events location
)r-Historic facilities could be expanded to include more interpretation and passive
use
)r-ADA access is limited in many of the parks and City should continue to work on
ADA transition plan implementation
)r-Continue to upgrade playgrounds on regular basis.
)r-Consider Programming needs when upgrading, repurposing or adding to existing
parks.
Preserve naturlt'wildife habitat
Improve or provide access to Greenbelt arees
Mixed use of natural and developed areas
Improve signage about tral use rules and
regulations
Improved river access
A~RMing
1•NOI.t 1111 llllpOftMitl )o/Mutn/1 ~~ lmpol'tMJt
1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
4.5
;... Current access is well distributed along the Green Belt trail considering one mile access to
parking trailheads
:;... Pedestrian access to the Green Belt is better on the north side than on the south side base
on X mile proximity
,. Green Belt Trail heads are typically underdeveloped or have inconsistent amenities
,. Provides access to (2) signature parks, (3) other parks and open space
,. Recreation Center access from the Green Belt could be improved and better marked
,. Waysides are scattered and inconsistent. Often these are not ideally located
,. Currently interpretation is limited to trail kiosks at access points
Mileage markers and wayfinding could be improved
Minimal infrastructure available for nature based programming
)-Consider Greenbelt Master Plan that addresses the following key elements:
);> Consistently developed Green Belt Trail heads ... this is a great opportunity to
connect with the greater area and to neighborhoods and can be done appropriately
for each location
);> Look at potential gap areas to add additional pedestrian and car access opportunities
);> Nature programming opportunities
);> Strategic waysides
);> Historic, Nature or Environmental interpretation opportunities
);> Commercial or Mixed Use Opportunities may exist on adjacent or nearby properties
that capitalize on the Green Belt's significance and popularity but they need to relate
to it rather than back to it.
() ;o :z
,;()
' t M'I
t"""" ;.-!
~V1
"' ~ ~
Residential Setbacks and Reinvestment in East Wheat Ridge
April 6, 2015
Page 3
In combination, these two amendments would address the perceived setback burden on substandard
lots, particularly in East Wheat Ridge. Ifboth amendments are advanced, the lesser of the two
setbacks could prevail. Staff recommends these changes apply to all residential zone districts with
the understanding that the change is unlikely to impact properties west of Wadsworth where lot sizes
and widths tend to be larger.
Multifamily Redevelopment
As Council is aware, the height and density restrictions in the City Charter can be perceived as a
barrier to development of new multifamily products either for rent or for purchase. Since these
provisions are outside the zoning code, they are not included within the scope of this memo. That
said, staff has identified one other provision in Chapter 26 that directly prohibits multifamily
development in neighborhoods otherwise zoned for apartments and townhomes.
Section 26-117 .D directly prohibits the consolidation and development of parcels zoned R -3 and
R-3A unless the predominant adjacent land use is already multifamily development of a similar
density. The purpose of this provision is to protect the character of lower density neighborhoods that
are zoned for a higher density than individual lots can support. Staff is not aware of any
development that has been thwarted by this provision in recent years. An alternative is to rezone
R-3 /R-3A parcels to Pla1med Residential Development which is a longer, but perhaps more
appropriate, route to ensure compatibility with adjacent densities.
. .
Amendment of this code section may require more substantial policy discussion and a more
thorough analysis ofpotential implications.
Teardown Trend
During the March 2nd study session, there were several specific comments and questions related to
teardowns in East Wheat Ridge. Teardowns or scrapes are a trending phenomenon in landlocked
urban communities in which older homes are removed and replaced with newer and larger homes.
Council observed that teardowns occur more frequently in nearby Denver neighborhoods than in
Wheat Ridge. Staff has provided an analysis of this trend and related zoning code provisions.
Economics of Teardowns
Based on national patterns, teardowns generally occur in neighborhoods that are highly desirable,
but where land is scarce and homes are small. The teardown trend is most prevalent in areas that are
intrinsically appealing based on location, schools, shopping districts, parks, walkability and/or
aesthetics. Based on comments from residents and from people in the real estate industry, East
W11eat Ridge is increasingly considered a highly attractive neighborhood.
From an economic perspective, teardowns only occur if they are the financially attractive option.
Fundamentally, a teardown makes sense only if the value of the land exceeds the value of the
existing home. Developers or homeowners who are seeking a teardown property generally follow
the "rule of three," meaning a scrape is likely to occur only if a replacement home can be sold for
three times the cost of the initial purchase and demolition.
3
Residential Setbacks and Reinvestment in East Wheat Ridge
Aptil 6, 2015
Page4
A recent Denver Post article supports this rule of three. The February 8 article "Scrapes are back in
force" cites a developer who purchased a property in West Wash Park for $460,000 to reconstruct a
duplex. Each unit will be listed for $889,000 for a total resale of$1 ,778,000, over three times the
initial purchase price.
The basic economics of teardowns, may explain why they have been more common in certain
Denver neighborhoods than in Wheat Ridge. The current average price of homes sold in East Wheat
Ridge is $289,000. If you could find a property for $200,000 the economics of a teardown would
require you to sell it for $600,000 and this scenario is perhaps unlikely to be supported by the current
market.
Regulat01y Context ofTeardowns
Market realities notwithstanding, staff has completed an analysis of the zoning code to determine
what regulations may support or prevent teardowns, pop-tops, or other residential reinvestment. The
following list describes the zoning tools that are typically used to control residential development
and how they affect the regulatory climate in Wheat Ridge.
Zoning tools used in Wheat Ridge:
• Building coverage: This simple standard is used to limit the density of structures. In most
residential zone districts in the City, and specifically in East Wheat Ridge, the maximum
allowed building coverage is 40%. This is calculated as a ratio of the lot area to the area of
the building footprint (including all tructures and deck , but excluding at-grade patios,
sidewalks, or driveways).
Staff has completed an analysis of existing building coverage among three older subdivisions
in East Wheat Ridge (see Exhibit I). Among 438 properties developed with single-family
homes, the average building coverage is only 28% of the lot area. The average lot size for
single family homes in these subdivisions is 6,777 square feet, and the maximum 40%
coverage would allow up to 2, 710 square feet of first floor buildable area. This area should
be more than sufficient to allow development of a home that is attractive to the modern
homebuyer. Staff does not recommend any change to the existing building coverage
standards.
• Setbacks: Front, side, and rear setback standards are used to preserve a buffer from the street,
promote more uniforn1 development patterns, and provide adequate buffers between lots and
structures. Setbacks limit the location of development by defining the buildable area of a
lot. In most cases, this buildable area will far exceed the size limits established by building
coverage standards. For this reason, setbacks usually have less of an overall impact on site
design than other zoning standards. Residential setbacks were substantially revised (and
generally reduced) in 2009. Other than the proposed amendment for street-facing setbacks,
staff does not recommend any change to this standard.
• Maximum height: Section 5.1 0.1 of the City Charter establishes a maximum height limit of
35 feet for all residential zone districts. This height generously allows for a two-story
structure with peaked roofs and can also accommodate a three-story structure with a shed or
4
Residential Setbacks and Reinvestment in East Wheat Ridge
April 6, 2015
Page 5
flat roof. Most residences in Wheat Ridge are single story and are well below this height
limit.
• Open space: Minimum open space requirements can limit the size and location of
development on a lot. For single-and two-family zone districts in Wheat Ridge, only 25% of
the lot area is required to be landscaped. For multifamily uses in multifamily zone districts,
this increases to 30%. For residential uses in mixed use districts, this standard is only 10 to
15%. Staff does not recommend any change to this standard.
Zoning tools not used in Wheat Ridge:
• Floor-area-ratios (FAR): These ratios are used as an alternative to a building coverage
percentage and are used to limit the gross size (including all floors) of a home or structure
relative to the size of its lot. These standards can be used to prevent teardowns by limiting
the size of new homes, but the City does not utilize FAR standards.
• Bulk plane: Bulk plane standards limit the volume of space a building can occupy. Unlike
FAR, bulk plane is not relative to the lot area, but may be relative to neighboring structures,
sunlight, and/or view sheds. Again, these standards typically prevent or limit teardowns or
pop-tops, but the City does not utilize bulk plane standards.
• Design standards: Design standards can dictate a wide array of architectural considerations
including roof pitch, material selection, garage location, color, solar access, and scale.
Design standards are often used to ensure compatibility within a neighborhood or to protect
historic character. The City has never adopted design standards for single-or two-family
homes. The Architectural and Site Design Manual applies to multifamily projects, but its
purpose is to ensure material durability and variation rather than to mandate a prescriptive
design character.
• Context-based zoning: Sometimes used as an umbrella term, context-based zoning can be
used to generally desc1ibe all of the above tools or it can refer to more specific overlay
standards. The Denver Zoning Code is a good example of context-based zoning. With the
2010 update, it now includes different standards for different types of neighborhoods, such as
suburban neighborhood context, urban edge neighborhood context, and general urban
neighborhood context. Wheat Ridge does not utilize context-based zoning in residential
districts.
• Demolition delay ordinance: Prior to issuing demolition permits, some cities require
neighborhood notice or waiting periods to slow teardown activity. The City of Denver, for
example, outlines a 20 to 50 day timeline for issuance of a demo pennit. In Wheat Ridge,
demo pennits are issued over the counter.
Ultimately, while Wheat Ridge has not seen an increasing pattern of teardowns, it does not appear
that the regulatory framework is preventing this activity. The provision of over-the-counter demo
permits and the absence of FAR, bulk plane, and design standards promote a pennissive
environment related to residential reinvestment. In general, the City's zoning code appears to
support the rights of property owners to reinvest in their homes or to demolish and replace them.
5
Residential Setbacks and Reinvestment in East Wheat Ridge
April6, 2015
Page 6
The proposed amendments related to setback reductions would further support the City's
reinvestment goals.
Next Steps
As described in this memo, staff is proposing two specific code amendments that could modify the
regulatory framework in support of residential reinvestment. Council is asked to provide direction
on each of these items:
• Reduced setbacks for substandard corner lots, and
• Reduced setbacks based on neighborhood averages for side and rear yards.
Further, staff requests direction from Council on the matter of R-3 lot consolidation.
6
Draft 2015 Citizen Survey
April 6, 2015
Page2
It is important to note that many of the survey questions allow for comparisons to national and
front-range benchmark data, available through the National Research Center (policy questions
excluded); therefore, these same questions appear on each iteration of the survey. This approach
provides comparable trend data and benchmarks for Wheat Ridge. The NCS was among the first
scientific surveys to gather resident opinions on a range of community issues and has been used
by more than 300 communities in 45 states. The NCS is the only citizen survey tool endorsed by
the International City/County Management Association (ICMA) and the National League of
Cities (NLC). Following the data analysis and report writing phase of the project, City Council
can expect to see a presentation of the citizen survey results during a study session in late August
or early September. Staff also plans to include a snapshot of survey results in a future edition of
the Connections Newsletter.
Policy Questions
Included for your review and discussion during the study session on March 16th are several
policy questions that directors have drafted with the assistance of the NRC. The purpose of
including these policy questions is to gauge the level of support, importance, and opinion of
residents related to the following current policy topics. Please keep in mind that the average
length of a citizen survey (or best practice) is five to seven pages. Lengthier surveys can
negatively impact response rates. The attached draft is seven pages.
A new section was added titled "38th Avenue/Main Street" to include:
• Questions 22 and 23 (these questions are not new and were asked in the 2012 survey)
• Questions 24 and 25 , regarding the features of the main street and street width
designation
Other policy questions were drafted to include:
• Code Enforcement, questions 26 and 27
• Bicycle/Pedestrian Master Plan, questions 28 and 29
• Infrastructure funding/priorities, questions 30 and 31
Overall, the following questions were added to the survey:
• Question 3 -gauges reasons for living in Wheat Ridge
• Question 17 -victim of a crime two-part question that can be cross-tabulated with
existing question 16 and question 18
REQUESTED ACTION:
Again, staff is looking for consensus on inclusion of the draft policy questions as well as
direction on the addition of any other questions at the March 16th study session. If you have any
questions about the 2015 Citizen Survey prior to this meeting, please feel free to contact me at
303-235-2826.
ATTACHMENT:
1. Draft 2015 Citizen Survey
lhmg