HomeMy WebLinkAbout09/25/2007HOUSING AUTHORITY
MEETING
September 25, 2007
CITY COUNCIL CHAMBERS
5:00 P.M.
A. Call Meeting Yo Order
B. Roll Call
C. Approval of the Minutes: August 28, 2007
D. Officers Reports
E. Public Forum
F. Unfinished Business
G. New Business
1. Updates on closing status for Allison and 41st developments
2. Update on Parfet water situation
3. Possible candidates for final single family acquisition
4. Parkside update
H. Other
1. Richards-Hart Estate duplex status
L Adjournment
MINUTES
WHEAT RIDGE HOUSING AUTHORITY
August 28, 2007
A. CALL MEETING TO ORDER
The meeting was called to order by Chair Brungardt at 5:00 p.m.
B. ROLL CALL
Authority members present: Cheryl Brungardt
Kent Davis
Kathy Nuanes
L,ena Rotola
Janice Thompson
Others present: Sa11y Payne, Acting Executive Director
Larry Nelson, Cornerstone Realty
Betty Maybin, Comerstone Realty
Henry Wehrdt, Construction Manager
Marcy Emily, Property Manager
Vera Murey, 3771 Quail
- Kay Hunt, 3755 Quail
Cameron Schaefer, 3751 Quail
Ann Lazzeri, Secretary
C. APPROVAL OF MINUTES
It was moved by Kent Davis and seconded by Kathy Nuanes to approve the
minutes of June 26, 2007. The motion passed 5-0.
It was moved by Kathy Nuanes and seconded by Janice Thompson to
approve the minutes of the special meeting of July 26, 2007. The motion
passed 4-0 with Kent Davis abstaining.
D. OFFICERS REPORTS
There were no reports.
E. PUBLIC FORUM
There was no one to address the Authority at this time.
F. UNFINISHED BUSINESS
• Status of Parfet Property Henry Wehrdt reported on the Parfet property.
_ The low bid was submitted by Park Range. When the contractor came to start
the job, there was a foot of water in the basement. The origin of the water has
Housing Authoriry Minutes - 1- August 28, 2007
not yet been determined. The contractor submitted a change order to approve
an increased cost for his staff to wear respirators. He also requested that a
hygienist be hired to inspect the property for viability. At this time, there is
not a cost estimate for a hygienisYs services. Mr. Wehrdt instructed the
contractor to stop work until there are some answers about the water issue.
G. NEW BUSINESS
Occupancv Requirements - Quail Square (This item was heard after
approval of the minutes)
Vera Murey, a member of the Homeowners Association Board for Quail
Square stated that one of the owners at Quail Square rented his unit to his
niece who would not be considered an immediate member of his family.
The niece has since moved and the owner has the unit up for sale. He
would like to rent his unit until such time as it is sold. This is not allowed
under the covenants.
Ms. Murey presented a petition to the Authority requesting clarification of
the term "immediate family" in the Declazation of Condominium for Quail
Square Condominiums. She also stated that the Board would like to see
this requirement applied to all present and future Housing Authority units.
It was moved by Janice Thompson and seconded by Lena Rotola to
accept the resolution of the Quail Square Condominium Association
regarding the definition of "immediate family" and extend this
definit'ron to all existing and future Housing Authority projects.
Cheryl Brungardt thanked the residents for bringing this matter to the
attention of the Housing Authority. She also recommended that the
Housing Authority be responsible for any legal fees that may be incurred
by the residents who requested changes to the covenants.
Property Acquisitions
Jacqueline Pickett, Community Development Director and Melanie
Guinan, Project Manager, for Jefferson County were present to explain the
process involved to get funds released when a property is in a floodplain.
Ms. Pickett explained that the process includes submission of the project
to several agencies for approval and notice must be given to the public.
Authority members were given a copy of the Floodplain Management
policies regarding Relationship to Flood Insurance Purchase
Requirements. She estimated that closing on the property under contract
to the Housing Authority could take place by October 16. She didn't
anticipate any objections from any of the agencies or from the public.
Housing Authority Minutes - 2- August 28, 2007
3. Vacancy - Richards-Hart Estate Duplex
There was discussion about the vacant unit in the duplex on the Richards-
Hart Estate property.
There was a consensus that this item should be discussed with the Parks
Department at a City Council study session. Lena Rotola estimated a 2-3
week period to get this item on a study session agenda. Kent Davis
suggested that discussion on this matter be postponed until after the study
session and there is direction from City Council.
H. OTHER
Larry Nelson announced that the repossessed unit at Park Side is under
contract for $130,000 which would result in a profit of $17,000. Notices will
be placed on Channel 8 about the one remaining unit for sale at Park Side.
Cheryl suggested that the Housing Authority issue a statement encouraging
homeowners and renters to join the efforts of the Housing Authority to
improve Wheat Ridge by taking care of their properties and mowing their
lawns.
L ADJOURNMENT
It was moved by Kent Davis and seconded by Kathy Nuanes to adjourn the
meeting at 6:15 p.m. The motion passed unanimously. The next meeting will
be held on September 25, 2007.
Cheryl Brungardt, Chair
Ann Lazzeri, Secretary
Housing Authority Minutes - 3- August 28, 2007
From the desk of John Schumacher, CBO
Chief Building Official
Building Inspection Division
Office (303) 235-2853
Fax (303) 235-2857
On September 6, 2007, an inspection of the property located at 2760/2770 Chase Street was
conducted to assess the condition of the structure and the extent of the repairs required for the
structure to meet applicable codes and standards for residential structures within the City of Wheat
Ridge. The structure is a two-story duplex, with a two-story unit at 2770 Chase Street, and a single
level unit at 2760 Chase Street. The exterior of the entire structure and the interior of the unit at 2760
Chase Street was the subject of the inspection. The interior of 2770 Chase Street was not accessible
for the inspection. As a result of the inspection, the following determinations were made:
1. The existing siding is asbestos shingle siding, and is damaged in two separate areas of the
structure, comprising approximately 25 square feet of the exterior of the structure. It will be
necessary to abate the damaged siding in a manner consistent with state and federal asbestos
abatement regulations. The remaining siding would be able to be covered by application of new
siding; however the options far the type of siding that should be applied aze limited by the use of
the existing asbestos shingles as a base for the new siding. Additionally, there are large gaps in
the existing asbestos shingle siding, which has allowed moisture to penetrate the sheathing
behind the siding. This moisture penetration has contributed to mild deterioration damage to the
structural components of the structure at its' base, and enclosure of this moisture and its' xelated
_ damage may serve to hasten the deterioration of the structural components. The best method of
preventing this enclosure of moisture and assessing the extent of the structural deterioration is to
remove all of the existing asbestos shingle siding, which could prove to be very costly.
2. The existing flooring is asbestos tile, and covering or abatement of these tiles is required.
3. The existing roof covering is in poor condition and requires replacement. There are
approximately 14-1/2 squares of roof covering on the structure. The existing roof sheathing is 1"
board material, and will likely require some repair as a result of deterioration, and damage during
the re-roofing process. It would also be necessary to add ventilation to the roof system during
roof replacement.
4. The bathtub has a wood sill at the window over the tub which is deteriorated and shows a
possibility of mold growth. This sill should be replaced with an appropriate moisture-resistant
material, at which time a test for the presence of mold could be made. If mold is confirmed,
treatment or abatement would be necessary.
5. The water heater for the unit at 2760 is new, and was installed on 7-7-06. There is improper
access to the water heater, insufficient combustion air, and incomplete gas shut off valves for the
water heater and the furnace. The furnace is aged, but is of adequate size. The function of the
furnace unit under demand conditions is undeterminable.
6. The electrical panel was not accessible, but the service appears to have been updated since
original construction. The electrical wiring, outlets and switches were acceptable at the time of
installation, and continued use is permissible, but the system is outdated, there are no GFCI
outlets in the wet areas, and the potential for malfunction and the need for repair or replacement
in the near future axe likely.
- Without access to the adjoining unit, an accurate assessment is impossible, but it is reasonable to
assume that the conditions that exist in 2760 Chase Stxeet also exisC in 2770 Chase Street. The
structure is in need of general repair and maintenance, including windows, drainage adjustment,
landscaping, interior paint, furnace and duct cleaning, plumbing fixture replacement and possible
repair of structural deterioration.
The estimated cost of repairs for the listed items is $15,185.00, plus minor asbestos abatement costs.
The potential for additional costs associated with the listed items for additional asbestos abatement,
roof sheathing replacement, mold investigation and/or treatment, and other items indeterminable at
this time is substantial, and could likely increase the total cost of repairs to over $25,000.00.
Inclusion of the cost of the general maintenance and repair items to bring the property into
reasonable compliance with current standards in the total cost could raise this figure to well over
$40,000.00. The possibility of additional repair is likely, but cannot be determined until the listed
work is begun, creating a scenario in which unspecified change orders are likely.
n119107 Wheat Ridge Housing Authority
Balance Sheet
As of September 19, 2007
-
Sep 19, '07
ASSETS
Current Assets
Check(ng/Savings
113 • 1st Bank - Checking
(5,202)
120 • 1st Bank - Money Market
670,219
Total Checking/Savings
665,017
Other Current Assets
151 • ParkSide ProJect Inventory
216,415
153 • Pertet Project Inventory
350,869
154 • Allison ProJect Inventory
10,700
155 • 41st Avenue Project
4,900
Totel Other Current Assets
582,864
Totel Current Assats
1,247,901
Other Assets
273 • Note Receivable • Baca
8,958
290 • HOA Working Capital
350
Total Other Assets
9,308
TOTAL ASSETS
1,257,209
LIABILITIES & EQUITY
Liabilities
Current Liabilities
Other Current Liabilities
310 • Real Estate Taxes Dua
579
Total Other Current Liabilities
579
Total Current Liabilities
579
Total Liabilities
579
Equity
Net Income 11,224
465. Fund Balanca 1,245,407
Total Equity 1,256,631
~ TOTAL LIABIlIT1ES & EQUITY 1,257,210
Page t of 1