HomeMy WebLinkAbout3405 Estes Streeti CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: q Qq ` F, I d f Rto—f
Job Address: ? Lf d `s E >t es 3
Permit Number: o =-?
❑ No one available for inspection: Time PM
Re -Inspection required: Yes i 1/
When corrections have been made, call for re -inspection at 303-234-5933
Date:_ Inspector: bene.
DO NOT REMOVE THIS NOTICE
r ,
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: 3 h ,,�roo'f
Job Address: Jg07 64-#-x"5 S+,
Permit Number: `l 01d 02- 3'? 5
1174f
, A",-00 sl 0
❑ No one available for inspection: Time AMS
Re -Inspection required: Yes
When corrections have been made, call for Mre-inspection at 303-234-5933
Date: 0 Inspector: rE EO V-6 f
DO NOT REMOVE THIS NOTICE
City of Wheat Ridge
Residential Roofing PERMIT - 201802375
PERMIT NO: 201802375 ISSUED: 08/28/2018
JOB ADDRESS: 3405 Estes St EXPIRES: 08/28/2019
JOB DESCRIPTION: Reroof remove and install CeDUR Walden Polyurethane Roofing Shake Shingles
with 34.89 squares.
Pitch 4/12. House. **Install to Manufacturers installation specification
sheets provided by contractor**
*** CONTACTS ***
OWNER (303)908-1614 BOULEE EDMOND A
SUB (303)902-5338 Phillip Simon/Steve Merkel 170232 Simon Bros Roofing & Restor.
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 50,000.00
FEES
Total Valuation 0.00
Use Tax 1,050.00
Permit Fee 729.55
** TOTAL ** 1,779.55
*** COMMENTS ***
*** CONDITIONS ***
Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be
required for both the midroof and final inspections. The 3rd party inspection report AND
THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat
Ridge. The report MUST BE SIGNED by the Homeowner.
REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec.
R806. The installation of ridge venting requires the installation or existence of soffit
venting. For calculation purposes, one hat or turtle vent equal to one-half of one square
foot of opening.
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name) roof
covering" is required to be on site at the time of final inspection.
a r A A( City of Wheat Ridge
V,
_1�9
Residential Roofing PERMIT - 201802375
PERMIT NO: 201802375 ISSUED: 08/28/2018
JOB ADDRESS: 3405 Estes St EXPIRES: 08/28/2019
JOB DESCRIPTION: Reroof remove and install CeDUR Walden Polyurethane Roofing Shake Shingles
with 34.89 squares.
Pitch 4/12. House. **Install to Manufacturers installation specification
sheets provided by contractor**
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications;
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be
performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signature of OWNER or000NTRACTOR (Circle one) Date
1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, po plans
and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the originalpermit fee.
3. If this permit expires, a new permit may be required to be obtained. issuance of a new permit shall be subject to the standard
requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Off Bial and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The =ianting a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applany nance or regulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Lagenia Reimer 0_/W�
From: no-reply@ci.wheatridge.co.us
Sent: Tuesday, August 28, 2018 9:51 AM
To: CommDev Permits
Subject: Online Form Submittal: Residential Roofing Permit Application
Categories: Gina
Residential Roofing Permit Application
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
to City Hall to submit an application in person. Permits are processed and issued it
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
your contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. The Building Division permit counter is open from
7:30 am to 3:30 pm, Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a Yes
residential roof?
How many dwelling units Single Family Home
are on the property?
PROPERTY INFORMATION
Property Address
Property Owner Name
3405 Estes Street
Ruth and Ed Boulee
Property Owner Phone 3039081614
Number (enter WITH
dashes, eg 303-123-4567)
17,11
��
Property Owner Email
Address
Do you have a signed
contract to reroof this
property?
Applications cannot be
submitted without an
executed contract
attached below.
r.boulee@yahoo.com
Yes
Attach Copy of Executed Contract. Boulee 3405.1)df
Contract
CONTRACTOR INFORMATION
Contractor Business
Name
Contractor's License
Number (This is a 5 or 6
digit number for the City
of Wheat Ridge)
Contractor Phone
Number (enter WITH
dashes, eg 303-123-4567)
Simon Bros roofing and Restoration, LLC
170232
303-902-5338
Contractor Address 6803 E 47th Avenue Dr Unit B
(Primary address of your
business)
Contractor Email Address simonbros.roofing@gmail.com
Retype Contractor Email simonbros.roofing@gmail.com
Address
DESCRIPTION OF WORK
TOTAL SQUARES of
the entire scope of work:
Project Value (contract
value or cost of ALL
materials and labor)
Are you re -decking the
roof?
Is the permit for a flat
roof, pitched roof, or
34.89
$50000
No
Pitched roof (2:12 pitch or greater)
2
both? (check all that
apply)
What is the specific pitch 4:12
of the PITCHED roof?
How many squares are 34.89
part of the PITCHED
roof?
Describe the roofing Cedur Walden
materials for the
PITCHED roof:
Type of material for the Other
PITCHED roof:
If "Other" is selected Cedur Walden
above, describe here:
Provide any additional House
detail here on the
description of work. (Is
this for a house or
garage? Etc)
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this Yes
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
3
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
I attest that everything Yes
stated in this application
is true and correct and
that falsifying
information in this
application is an act of
fraud and may be
punishable by fine,
imprisonment, or both.
Person Applying for Marisela Porras
Permit
Email not displaying correctly? View it in your browser.
ao �
`-' 3 ACOS
without the splitting, rotting, warping, and risk of fire
�1 ,' • •• •• inherent to natural cedar shakes.
►•��, • • •
CeDUR Roofing Shakes are developed to withstand nature's harsh
elements while providing the classic beauty of natural cedar
CeDUR
Timeless • Durable • Beautiful
• Class A Fire Rating (highest rating available), without the need
of a special fire-resistant underlayment
• Class 4 Impact Rating (highest rating available)
• Molded from natural cedar shakes with 5 7 and 12" shakes
and a 3/4" butt, which gives deeper shadow lines making your
roof virtually indistinguishable from natural cedar shakes
• Potential reductions in Homeowner's insurance - listed on most
major insurance companies premium credits product listing
• Synthetic roofing product that ages to a beautiful wood color
• Solid product - no cavity back (Color Through Pigmentation)
• Manufactured in Colorado using State -of -the -Art Polyurethane
Technology, CeDUR installs just like natural cedar shakes
• Wind resistant - certified to wind gusts up to 115 mph
• Improves the insulation value of your roof
• Lightweight product - just 170 lbs per square
• 50 Year Limited Material Warranty
Patent
10
60
V * O ♦i
CQ • • V
�� 'V1�► Zii MEMBER �o
Update Effective October 12, 2017
CeDUR
Timeless Durable • Beautiful
Installation Recommendations
Introduction- CeDUR"" Shakes
CeDUR'"" Shakes are inspired by the enduring beauty of natural cedar shakes. CeDUR"" is
manufactured using state of the art polyurethane technology that was developed to withstand
harsh: fire, hail, wind, and UV conditions. Discerning property owners choose CeDURTM as the
low maintenance, high performance roofing product that enhances the beauty and value of their
property. The product combines the beauty of natural cedar shakes with unsurpassed durability
and ease of standard shakes installation methods. CeDURT" Shakes are a lightweight, fire, hail,
and wind resistant product that are ideal for projects that demand a natural cedar shake
appearance.
CeDURTM Shakes are
• UL 2218 Class 4 impact rated
• Class "A" Fire rated without the requirement of a special fire-resistant underlayment.
ASTM E 108, UL 790
• Rated @ an insulation value of R > 2.0 R factor (approximately 20% greater than natural
Heavy Cedar Shakes)
• 115 mph wind resistant rated for the "Standard Application" — at a 10" exposure. ASTM
E330, UL 1897 (warrantied to 90mph)
• Above 115 mph wind resistance installations are considered "High Wind Application" —
consult CeDURTM.
• Resistant to water absorption.
• Colored throughout for stability and uniformity at cuts. Solid product, no cavity back.
• Lightweight (170 lbs. per Square).
• Resistant to rot, moss, and insects
• CeDURTM Shakes are protected by a 50 Year Limited Material Warranty.
• Ideal for new construction and re -roofing applications for residential and commercial
projects
Design
CeDURT" Shakes are a realistic synthetic shake alternative with a nominal 3/4" thick butt edge
which tapers to 1/8" thick. It is manufactured in three widths: 5'/4 ", 7'/4", and 12'/4" & four
natural wood colors. The shakes are reproductions of natural wood cedar shakes. CeDURT^"
Shakes provide a personal preference option for architectural compatibility, roof appearance, fire
resistance and roofing weight. Refer to the CeDURT" Shakes Technical Specifications for details
and coverage based on exposure and spacing between shakes.
Page 1
Update Effective October 12, 2017
Pitch
The minimum roof pitch for CeDURT" Shakes is a 4:12 slope. Applications below 4:12 are
considered decorative. For pitches under 4:12, please consult CeDUR for proper installation
recommendations.
Roof Framing
CeDURT"" Shake's lightweight system allows direct replacement of existing roof systems without
the structural evaluations and enhancements necessary for heavier roofing products. This
product feature also holds true for new construction. No unusual design or engineering
considerations are required. CeDURTm Shakes weigh approximately 30% less than Asphalt
Architectural Shingles and less than natural Heavy Cedar Shakes. CeDURT" Shakes are
approximately 80% less than the weight of standard Concrete Roof Tile.
Decking
Install CeDURT" Shakes on solid decking consisting of either code -complying, 15/32" thick
American Plywood Association (APA) rated plywood, APA rated wood panels, or other building
materials meeting these minimum requirements in accordance with DOC PS -1.
Temperature/Cold Climates — Storage & Installation
CeDURT"° Shakes should be stored at temperatures above 40°F and pallets should not be stacked
more than two pallets high.
CeDURT"' Shakes can be installed in temperatures as low as 20°F.
Underlayment (For pitches 6:12 and above)
No special underlayment is required for a Class A Fire rating One of the following base
underlayment's is required as part of the normal application process.
• One layer of Number 30 base sheet conforming to ASTM D 226 covering the entire roof
deck; or alternatively, synthetic underlayment manufactured for and utilized for shingle
underlayment purposes. Verify with the manufacturer that the specific base sheet is water
resistant.
• Ice Protection
In areas where the average daily temperature in January is 25°F (-4°C) or less, install an
ice barrier that consists a self -adhering polymer modified bitumen sheet in lieu of normal
underlayment at the eaves. Extend ice protection underlayment from the eaves edge to a
point at least 24 inches (610mm) inside the exterior wall line of the building.
• Valley's
Install a high temperature ice/water barrier that consists of a self -adhering polymer
modified bitumen sheet in lieu of normal underlayment at the valley's.
To assure proper horizontal alignment we recommend that chalk lines be snapped frequently.
These chalk lines should be placed on the underlayment so that the shakes are aligned by the tips
rather than the butts.
Chalk Lines should be snapped on the underlayment with the tips of the shakes following the
lines. Do not snap lines on the CeDURTM Shakes or use red chalk as the chalk may
permanently discolor the shakes.
Page 2
Update Effective October 12, 2017
Note: A base (dry in) underlayment may be installed covering the entire roof deck prior to the
CeDURT" Shake installation assembly described above as a temporary dry -in if desired or if
required by local building codes. The CeDURTm roofing system can be installed over existing
temporary dry -in providing the material lays flat and tight to the roof deck.
Underlayment (For pitches between 4:12 and under 6:12)
In addition to one of the base sheet options described above, install one layer of ASTM D 226
type 11 36 -inch NO 30 underlayment at the eave line. After applying the starter shakes, a
minimum 18" wide strip of interlay of ASTM D 226 -type II (ASTM D 4869) No. 30 shall be laid
over the top portion of the starter shakes, the butt end of the interlay course extending up-slope
onto the sheathing and/or dry -in, approximately 9 inches above the fascia (For a 1 inch
overhang). After installing the field shakes over the starter shakes, position the bottom edge of
the next interlay on the 10 -inch line of the interlay previously installed, with successive courses
laid on the 10 -inch line (or less depending on roof layouts less than 10") Refer to the installation
diagram following the written text.
Note: Felt interlayment on the CeDUR'"" Shakes is to be installed so it does not extend below a
line that is twice the exposure above the butt (i.e. a 23.5" shakes at 10", exposure would have felt
applied 20" above the butt). No felt should be visible between the side joints of the shakes
(keyway). Refer to the CeDURTM Shakes Technical Specification Details.
Starter
CeDURTM Shakes "Starter" is to be installed at all eave-lines. Butts of the starter shakes and first
course of CeDURTN1 Shakes are to project equally beyond the finished fascia as determined by
conditions to insure proper water drainage. Typical installation is a 3/4" - 1 inch (25.4 mm)
overhang. Where gutters are present, the overhang may be adjusted to insure proper water flow
into the gutters.
Secure each 15" CeDURTM Starter with four corrosive resistant fasteners.
Refer to the CeDURT"" Shakes Technical Specification Details.
Gable Ends - Rakes
Extend CeDURTI Shakes approximately 3/4 inch over gable - rake ends.
Exposure
A 10" (254 mm) weather exposure for straight-line installations is standard, and has been used
for all calculations, testing and certifications, and the basis for the product warranty. When 1"
staggered installation is used, shakes exposure is laid at 9" (229 mm) exposure and random
shakes are at 10" (254 mm) exposure or 1" (25.4 +/-) stagger. The maximum recommended
stagger is 2 inches (8" exposure).
Spacing (Keyway) & Joint Off -Set
CeDURTM Shakes are resistant to water absorption. Expansion and contraction due to temperature
or moisture content fluctuations (hot/cold, wet/dry or freeze/thaw) is negligible, thereby
Page 3