HomeMy WebLinkAbout3955 Marshall StreetINSPECTION RECORD
Inspection onlin orm: http://www.ci.wheatridge.co.us/inspection tnspection
Cancellation must be submit the online form° he project site
Inspections will not be performed unfess this ca posted
tion the following business day
Request an inspection before MIDNIGHT (11:59 PM) to receive an inspecN - ' JOB CODE:
PERMIT: ADDRESS: , ? `, S `'� ,� ` : 4,L"( �
Inspector
Foundation Inspections
Date Initials
102 Caissons / Piers
103 Footing / P.E. Letter
104 Foundation Setback Cert.
105 Stem Walls
106 Foundation wall Insulation
Do Not Pour Concrete Prior To Approval Of The Above Inspections
Inspector
Underground I Slab Inspections Date Initials
Comments
Comments
201 Electrical I Cable/ Conduit
202 Sewer Underground Int.
203 Sewer Underground Ext.
204 Plumbing Underground Int.
205 Plumbing Underground Ext.
206 Water Underground roval Of The Above Inspections
Do Not Cover Underground or Below I In -Slab Work Prior To App
Rough Inspection
301 Rough Framing
302 Wall Sheathing
303 Roof Sheathing
304 Sheer Inspectie
306 Mid -Roof
ucco
308 Rough Electrical Residential
309 Rough Electrical Commercial
310 Electrical Meter Residential
311 Electrical Meter Commercial
312 Temp. Const. Meter
313 Rough Plumbing Residential
314 Rough Plumbing Commercial
315 Shower Pan
I Inspector
Date Initials
Comments
SEE OVER FOR ADDITIONAL INSPECTIONS
M
Y
PERMIT: ADDRESS:
JOB CODE: G
Rou h I
g nspection -
(continued)
316 Rough Mechanical Residential
317 Rough Mechanical Commercial
318 Boiler/ Furnace
319 Hot water tank
320 Drywall screw and Nail
321 Moisture board / shower walls
322 Rough Grading
323 Miscellaneous
Final Inspections
402 Gas Meter Release
403 Final Electrical Residential
404 Final Electrical Commercial
405 Final Mechanical Residential
406 Final Mechanical Commercial
407 Final Plumbing Residential
408 Final Plumbing Commercial
409 Final Roof
410 Final Window/Door
411 Landscape/Park/Planning'
412 Row/Drainage/Public Works**
413 Flood plain Inspection**
414 Fire Insp. / Fire Protection***
415 Public Works Final**
416 Storm Water Mgmt.**
417 Zoning Final Inspection*
418 Building Final Inspection
Date
Date
Inspector
Initials
Inspector
Initials
Comments
Comments
Inspections from these entities shall be requested
one week in advance.
*For landscaping and parking inspections please
call 303-235-2846
**For ROW and drainage inspections please call
303-235-2861
'For fire inspections please contact the Fire
Protection District for your project.
Note: All items must be completed and approved by Planning, Public Works, Fire and Building
before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not
constitute authorization of occupancy. of
For Low Voltage permits please be sure that rough inspections are completed by the Fire D
Electrical low voltage by the Building Division. District and
i CITY OF WHEAT RIDGE
1�9�Building Inspection Division
(303) 234-5933 Inspection line
1(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: 4--
Job Address: 5
Permit Number: sic:)k1 0 bg k9
❑ No one available for inspection- Time M
Re -Inspection required: Yes No
When corrections have been made, call f r re -inspection at -303-234-
i 3 -234 -
Date: /2- 4/Inspector:
DO NOT REMOVE THIS NOTICE
1* � 4 i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: 1069 (41 D
Job Address: 9L3- �� A t--1— '57,
Permit Number: 2D 1-)() 41
❑ No one available for inspectio : Time OM/M
Re -Inspection required: Ye No
When corrections have been made, call for re-inspe ion at 303-23 933
Date: I I 2 2 1 ?- Inspector: �t
DO NOT REMOVE THIS NOTICE
i CITY OF WHEAT RIDGE
Buildirg Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: -3 0 & - fil ,
Job Address: 3qs7s- %Y`)�, r,- T, t,4-
Permit Number: -D 0 1-7 ®mss C7 i 9
,d - Rooms 4)C-�
J
�3
V O ct c r rS-2
❑ No one available for inspection: Time AM
Re -Inspection required: Q No
When corrections have been made, call for re -inspection at 303-234-5933
Date: 1 i 14-7 Inspector
—T -D
DO NOT REMOVE THIS NOTICE
City of Wheat Ridge
Residential Roofing PERMIT - 201708919
PERMIT NO: 201708919 ISSUED: 11/07/2017
JOB ADDRESS: 3955 Marshall ST EXPIRES: 11/07/2018
JOB DESCRIPTION: Permit for reroof: Install 32 squares asphalt laminate shingles GAF
Timberline.
*** CONTACTS ***
OWNER (720)579-5194 MILOW BRADLEY B
SUB (303)422-2725 Gary Theriaque 021170 Bear Brothers Roofing
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 8,000.00
FEES
Total Valuation 0.00
Use Tax 168.00
Permit Fee 172.60
** TOTAL ** 340.60
*** COMMENTS ***
*** CONDITIONS ***
Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be
required for both the midroof and final inspections. The 3rd party inspection report AND
THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat
Ridge. The report MUST BE SIGNED by the Homeowner.
REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec.
R806. The installation of ridge venting requires the installation or existence of soffit
venting. For calculation purposes, one hat or turtle vent equal to one-half of one square
foot of opening.
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name) roof
covering" is required to be on site at the time of final inspection.
City of Wheat Ridge
Residential Roofing PERMIT - 201708919
PERMIT NO: 201708919 ISSUED: 11/07/2017
JOB ADDRESS: 3955 Marshall ST EXPIRES: 11/07/2018
JOB DESCRIPTION: Permit for reroof: Install 32 squares asphalt laminate shingles GAF
Timberline.
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanyingg approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this ermrt. I further attest that I am le ally authorized to include al
entities named within this document as parties to the work to be
performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signature of OWNER or CONTRACTOR (Circle one) Date
I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, po plans
and procedures.
2, This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing, and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees and�procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4, No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
(. The issua a or ranting of a e it shall n t be construed to be a permit for, or an approval of, any violation of any provision of any
applic*le X§Wman r &1ht>JFn of this jurisdiction. Approval of work is subject to Yield inspection.
Chief Building Offlb'idl Date
rST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Antoinette Kulick
Z -o n 0891`
From: no-reply@ci.wheatridge.co.us
Sent: Tuesday, November 7, 2017 9:22 AM
To: CommDev Permits
Subject: Online Form Submittal: Residential Roofing Permit Application
Residential Roofing Permit Application
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE ,�
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
your contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a Yes
residential roof?
How many dwelling units Single Family Home
are on the property?
PROPERTY INFORMATION
Property Address
Property Owner Name
Property Owner Phone
Number (enter WITH
dashes, eg 303-123-4567)
Property Owner Email
Address
3955 Marshall St.
Brad Milow
720-579-5194
Field not completed.
W/3110. (oma
Do you have a signed Yes
contract to reroof this
property?
Applications cannot be
submitted without an
executed contract
attached below.
Attach Copy of Executed Brad Milow Contract.pdf
Contract
CONTRACTOR INFORMATION
Contractor Business
Name
Contractor's License
Number (This is a 5 or 6
digit number for the City
of Wheat Ridge)
Contractor Phone
Number (enter WITH
dashes, eg 303-123-4567)
Contractor Address
(Primary address of your
business)
Bear Brothers Roofing
021170
303-422-2725
7245 Gilpin Way #280 Denver, CO 80229
Contractor Email Address ap@bearbrothersroofing.com
Retype Contractor Email ap@bearbrothersroofing.com
Address
DESCRIPTION OF WORK
TOTAL SQUARES of
the entire scope of work:
Project Value (contract
value or cost of ALL
materials and labor)
Are you re -decking the
roof?
Is the permit for a flat
roof, pitched roof, or
both? (check all that
apply)
32
No
Pitched roof (2:12 pitch or greater)
N
What is the specific pitch
of the PITCHED roof?
How many squares are
part of the PITCHED
roof?
Describe the roofing
materials for the
PITCHED roof:
Type of material for the
PITCHED roof:
Provide any additional
detail here on the
description of work. (Is
this for a house or
garage? Etc)
4
32
Laminate Shingles - GAF Timberline
Asphalt
House
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have been
authorized by the legal
owner of the property to
submit this application
Yes
Yes
Yes
Yes
3
and to perform the work
described above.
I attest that everything Yes
stated in this application
is true and correct and
that falsifying
information in this
application is an act of
fraud and may be
punishable by fine,
imprisonment, or both.
Name of Applicant Lauren Wright
Email not displaying correctly? View it in your browser.
F107"it - 7
k�VU�n �Zf
k lei ZA""Ply "We.
7246 Gilpin Way
Unit 280
Denver, CO 80229
303-422-2725 Fax 303-274-2151
I . SCOPE OF VVORK — ROOF
Bear Brothers Roofing, LLC shall furnish all labor and equipment required completing the
following 'Schedule of Work.' The Home Owner is responsible for furnishing all materials
needed to replace the roof to comply with the Wheat Ridge city building code.
2. SCHEDULE OF WORK
2-1 Apply for building permil:
2-2 Tear off old roofing system down to the decking and haul away.
23 Call in mkktet f inspection
2A Install new roof per Wheat Ridge building code
IS Remove all trash pertaining to the project from the property,
ze Call in final inzVection. Home owner must provide and set up tha ladder for the final
cdy inspeclion. Bear Brothers will notify the homeowner of the trispection date.
3. GENERAL REQUIREMENTS
3.1 Clean up all debris from the site.
3.2 Project to start Wthin 2 weeks from the date the permit gets approved and be
completed within 2 days of start dale or sooner weather perm".
31 Custonw has the right to cancel this conbract with full mfund wlthin ow &at 72
twurs of slank*.
4. WORKMANSHIP
4.1 Bear Brothers Rooling, LLC shall complete Vve project in a vAxkman like manner.
4.2 Bear Brothers Roofing, LLC shag make every effort to proled the property dunng the
wo(kprocess,
5. GUARANTEE
5.1 Bear Brothers Roo", s: all work to be perliormed in accordance with
the Manul.rt urefe requirements and/or specifications.
52 Guarantee shall be as killows
Sow Snoithem Two Yew Workinanship Wananty
613 Guarantee shall commence upon receipt of payment in full, effectim as of date of
oomplebort of project
6. FINAL
Scanned by CamScanner
Otto ber27,20i7
7. PAYMENT TERMS
7.1 Paynient shaft be due as follows:
Payment due In fuff on the day the rcof is irmUlled and campA
S. GENERAL CONDITIONS
8.1 This Contract shall become binding only upon witen acceptance hereof by
CoritrWor or an authorized Agent of the Contractor or upai commencement of
Work.
8.2 This Cont -ad consl�itutes the entire understanding of the parties and no
understanding, collateral or otherwise, shall be binding unless in writing and signed'
both pattes-
U Bear Brotheis Roofing cannot pay for or cover any insurartce deductibles -
8 -3.1 Replacement of rotten and/or deteriorated fascia boards, shingle mold, ventlato
siding or other materials, unless otherwise stated in this sr-acL am not included
the total cost and vAll be charged additionaNy on time andmaterial basis.
8.5 Any representation or other communication, not writtw in this Contract; is agreed
be immaterial and not to be relied upon by either party, and do not survive
exocuton of this Contract
9.6 Bear Brotiters PoofirQ, LLC wo*:men shall have access to all building water and 11
vok e4ecbicity du mig the entire wo* projecL
8.7 Owner vAll provide access to gates and the perimeter of all buildings on the propeq
frx sbddng delivery of matEnial.
8.8 Bear Brothers Rooling, LLC vAll not be held liable for any interior damage incu
during the roofing process. Or damage to driveway-. or vialkways arid mechan-,
unts or air cononers, spas, etc. during the project White we exercise the up m
care and use current industry piactices, the re -roofing process is inhermently
and potentially damaging to ft already compromised existing roof systern- The
reafing primess urjude-s increased roof top traffic and loads, which can damage
systems- Therefore we cannot be responsible for the watertight performance of
existing noofing systems during the m400ling pmcesss-
8.9 A SMIME CHARGE(administration fee of 21% per month vAll be charged on
overdue a=unts, which shall be defined as all aocounts remaining unpaid afthea-r th
due date, unless othenMse specified. In the event Sellers drects the use of leg
remedles to colled payment the Buyers agrees to pay to Sellers all costsrf
a*enses, including legal fees, hourTed in the course of collection or pendency of th
action.
ACCEPTED BY;
z =-
P C) -_ �
Data
•
kip
Building Permit Application
(Complete a highlighted areas)
3 2
(please print): AW
Date:
Plan #
Permit #
L__ U
Phone: , 19V 3
Address: Ifllfl? 6
MRSOM=
W=
Electrical: Plumbing:
City License # City License # City License #