HomeMy WebLinkAbout3540 Lewis Street• s "- * 0 • «
I
Amps Squares Other
`DINS-E—&hdN RECORD
INSPECTION REQUEST LINE: (303) 234-5933
Occupancy/Type
)rP r111
Inspections will not be performed unless this card is posted on the project site.
Call the inspection request line before 11:59 p.m. to receive an inspection the following business day.**
Inspector Must Sign ALL Spaces pertinent to this project
Sewer Service
Foundation Inspections Date Inspector Comments
Initials
Plumbing
Pier
Concrete Encased Ground (CEG)
Foundation / P.E. Letter
ucj imcm rumr c.nncrara rrinr i n nnnrncini c it i r,e nr,....., �..�.......a:_.__
Underground/Slab Inspections Date
Inspector Comments
Initials
Electrical
Inspections from these entities should be requested
one week in advance. For landscaping and parking
inspections call 303-235-2846. For ROW and drainage
inspections call 303-235-2861. For fire inspections
contact the Fire Protection District for your project.
Sewer Service
Floodplain Inspection (if applicable)
Plumbing
Final Electrical
Do Not Cover Underground or Below/In-Slab Work Prior To Approval Of The Above Inspections
Rough Inspections Date Inspector Comments
Initials
Wall Sheathing
Mid -Roof t
Lath / Wall Tie
Rough Electric "
Rough Plumbing/Gas Line
Rough Mechanical
Rough Framing
Rough Grading
Insulation
Drywall Screw/ Nail
Final Inspections Date Inspector
Initials
Comments
Landscaping & Parking / Planning Dept.
Inspections from these entities should be requested
one week in advance. For landscaping and parking
inspections call 303-235-2846. For ROW and drainage
inspections call 303-235-2861. For fire inspections
contact the Fire Protection District for your project.
ROW & Drainage / Public Works Dept.
Floodplain Inspection (if applicable)
Fire Inspection / Fire Protection Dist.
Final Electrical
Final Plumbing
Final Mechanical
Roof
Final Window/Doors
Final Building
NOTE. All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificr 'e
of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy.
...V- G —V ia1UU9 I IiaNGcuuiis dfu curnNieieu tram the rire uistrict and electrical low voltage
by the Building Division.
**For Inspection Time Window - Please email insptimereguest@ci.Wheatridge.CO.US by 8:00 A.M. the mora .4)
inspection with the property address in the subject line of the email. Time window is based on the inspector's roi
Occupancy Is Not Permitted Until A Certificate of Occupancy Is Is
Protect This Card From The Weather
s. City of Wheat Ridge
Residential Roofing PERMIT - 201701057
PERMIT NO: 201701057 ISSUED: 05/31/2017
JOB ADDRESS: 3640 Lewis ST EXPIRES: 05/31/2018
JOB DESCRIPTION: Reroof 38 squares 4/12 pitch (3640-3650 Lewis Street - DUPLEX)
*** CONTACTS ***
OWNER (303)548-5812 LINN DANIEL J
SUB (720)270-5600 Charles Riley 150026 Lifetime Construction LLC
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 9,766.00
FEES
Total Valuation 0.00
Use Tax 205.09
Permit Fee 204.30
** TOTAL ** 409.39
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) requires an approved inspection
prior to installation of ANY roof coverings and is require on the entire roof when spaced
or board sheathing with ANY gap exceeding k/2 -inch exists. Asphalt shingles are required to
be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is
required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturerdoms installation
instructions, whichever is more stringent. In order to pass a final inspection of
elastomeric or similar type roof coverings, a letter of inspection and approval from the
manufacturer's technical representative stating that "the application of the roof at
(project address) has been applied in accordance with the installation instruction for
(roof material brand name) roof covering" is required to be on site at the time of final
inspection.