HomeMy WebLinkAbout3150-3160 Lamar Street�.i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: /Im
Job Address: �J L�-o .A A V_!�z
r
Permit Number: 2 1.-) 0 4 042-
� O ff" oz -
LJ No one available for inspection: Time " I I V AM/RM
Re -Inspection required: Ye1`cts �J
When corrections have been made, call for re -ins a tion at 303434-543
Date: Inspector:
DO NOT REMOVE THIS NOTICE
City of Wheat Ridge
Residential Roofing PERMIT - 201706584
PERMIT NO: 201706584 ISSUED: 08/25/2017
JOB ADDRESS: 3150 Lamar ST EXPIRES: 08/25/2018
JOB DESCRIPTION: Residential Re -roof to install asphalt shingles - 56 sq
*** CONTACTS ***
OWNER (303)808-3403
BURNS NATHAN
SUB (303)548-5000
Alan Parkes
021001 Roof Corp of Metro Denver Inc.
*** PARCEL INFO ***
ZONE CODE:
UA / Unassigned
USE: UA / Unassigned
SUBDIVISION CODE:
2405 / BARTHS,
COULEHAN GRANGE,
WHEAT BLOCK/LOT#: 0 /
*** FEE SUMMARY ***
ESTIMATED PROJECT VALUATION: 20,000.00
FEES
Total Valuation
0.00
Use Tax
420.00
Permit Fee
362.80
** TOTAL **
782.80
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name)
roof covering" is required to be on site at the time of final inspection.
Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd
party inspection report will be collected at final roof inspection performed by City of
Wheat Ridge. If report is not available the final inspection will not be completed.
City of Wheat Ridge
Residential Roofing PERMIT - 201706584
PERMIT NO: 201706584 ISSUED: 08/25/2017
JOB ADDRESS: 3150 Lamar ST EXPIRES: 08/25/2018
JOB DESCRIPTION: Residential Re—roof to install asphalt shingles — 56 sq
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this ermrt. I furt r attest that I am leggally authorized to include all entities named within this document as parties to the work to be
performed d at all or be perfo ed is disclosed in this document and/or its' accompanying approved plans and specifications.
Si re o?__&R or TRACTOR (Circle one) Date
1. This permit was issued ased on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Budding
Official and may be subject to a fee equal to one-half of the originalpermit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of an manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
ap epc�odde or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
1685 South Colorado Blvd, Ste 240 (303) 766-2444 office
Denver, CO 80222 J!�\ �. (303) 766-0077 fax
roofcorp@msn.com email
Cent South Tucson Way OFCORP w'w w.roofco inc.com
Centennial, CO 80112 R09Metro Denver Inc.
AGREEMENT FOR ROOF INSTALLATION
CUSTOMER NAME:
ADDRESS: l loo City__ NEa�-r et�pGe Zip BoZtq
PHONE: .343- $ U t3 -3y03 email �6 6_01tE (z tr.&6t &u 9l @ WAA1,L , Gou•,
Roofcorp of Metro Denver Inc. hereby proposes to furnish the following:
(� a n..,.o N
Rooting Material: C3A 1= I I M 5 �iZ.LtrQC 1-i Color: �CPsl kIMILD
oaD —Rating:--(, t Fcr„t,�,
Existing Layers: f Layers to be torn off i Structures: ___//6 0
The following iterns;are included for ail Roofcorp installations:
Clean jobsite thoroughly removing all trash and debris.
All flashings shall be replaced or sealed as necessary including pipe jacks, step flashing, chimneys and skylights.
All roof installations shall be in accordance with required manufacturer specifications.
Upon request, customer shall be provided with written invoice which includes lien waiver and 5 year roof certification.
In addition to the manufacturer warrant a 2 �y le workmanship warranty is included for all installations.
' ,, , 5 ear transferab
Y ' L
It is understood that any decking which requires replacement shall be installed for an additional charge of $50 per 8x4 sheet.
In the event that there are hidden layers found during tear off, an additional charge of $25 per 100 sgft per layer may apply.
ADDITIONAL COMMENTS / ADDITIONS: NLI-J 7 0 L P ' (� '�uv r r-- i4c vt5
ATC
."/-T . I a 4
TcKCNG rc�tiE
( LE t Jaz 6v- S
TOTAL PROPOSED COST TO INSTALL ROOFING SYSTEM:
20,11 {%ol(Z
Note: Above price includes all taxes and fees but does NOT include any options listed below. N% z: �
1 F S.,
Payment terms. Payment is due upon completion and shall be cash or check. In the event the city inspections are delayed, customer agrees to pay
90% of contract price (or first insurance check) within 10 days of completion and balance once inspection is closed out. If payment is made with
credit card there shall be an additional charge of 1.5% added to balance paid.
Options and upgrades: (When initialed by customer, all option prices shall be added to the total proposed cost listed above.)
Shingle upgrade: MF Aa/ww 1 t- 12 $+ rard: Initials_y
Shingle upgrade:
Misc. upgrade:
5” seamless aluminum gutters and 20 downspouts: $+
Initials
Initials
Initials
c date 2 7 d -NE 2a date �� a
Roofc Of Metro Denver Inc. Owner
By signing this agreement, it is understood that this shall become a legally binding contract. Payment for above work shall be due upon completion. In the event that
payment is not received within 10 days after completion, any remaining balance shall be subject to a late fee of 1.5% per month from the day of completion. Customer
shall also be responsible for the cost of collecting said debt and will be additionally liable for all court costs, collection agency and attorney/legal fees.
Customer shall have the right to cancel this agreement in writing withi" z
1655 South Colorado Blvd, Ste 240 (303) 766-2444 office
Denver, CO 80222 Jii
'(303) 766-0077 fax
roofcorp@vmsn.com email
Cent South Tucson Way O CORPwww.roofcorpinc.com
Ct ntenrtial, CO 80112 etro Denver Inc.
AGREEMENT EMENT FOR ROOF INSTALLATION
CUSTOMERNAME: I ` ���_�,t� juaNS
ADDRESS: tSF% (�cwij City�u4�'rwo5 , 7..i
p -- p- __8_oZI�(.
PHONE:
Roofcorp of Metro Denver Inc. hereby proposes to furnish the followine:
13� ati`-j°H
Roofing Material: Liar -T1 ✓yt PJ-: V- i P CC 1-16 Color: Rating: L /r1 7, nn F,
Existing Layers: d —Layers to be torn off: -- — _ 1._ Structures: 14AL11
The following items are included for all Roofeorp installations:
Clean job site thoroughly removing all trash and debris.
All flashings shall be replaced or sealed as necessary including pipe jacks, step flashing, chimneys and skylights.
All roof installations shall be in accordance with required mantttacturer specifications,
Upon request, customer shall be provided with written invoice which includes lien waiver and 5 year roof certification.
In addition to the manufacturer warranty, a " 2 `✓5 year transferable workmanship warranty is included for all installations.
It is understood that any decking which requires replacement shall he installed for an additional charge of S50 per 8x4 sheet.
In the event that there are "hidden layers found during tear off, an additional charge of $25 per 100 sgft per layer may apply.
ADDI'T'IONAL COMMENTS / ADDITIONS: Mt`_W -bP cP f- i> 1.,r
?Aux-ft AbL PIPES -o lywra { l5' (b �t2[`r 9D V.9GGcrt( m _
; rfi sCGit�rl( ttyt� �clo . Rio I/CKI
TOTAL PROPOSED COST TO INSTALL ROOFING SYSTEM: �
Dote: Above price includes all taxes and fees but dots NOT include any options listed below.
Payment terms: Payment is due upon completion and s11211 be cash or check. In the event the city- inspections are delayed, customer agrees to pay
90% of contract price (or first insurance check) within 10 days of completion and balance once inspection is closed out. If payment is made with
credit care! there shall be an additional charge of 1.5% added to balance paid.
Options and Upgrades: (When initialed by customer, all option prices shall he added to the total proposed cost listed above.)
Shingle upgrade: _A(_&�/rt oR -5 t rLO I. t?. $+�Y�. � fl Initials
Shingle upgrade:
Misc. upgrade:
S+
S+
5" seamless aluminum gutters and 2x3 downspouts: S+
Initials
Initials
Initials
date ✓M
_ o Ate 20 j�° 1 .w4- .- z..•. ;r_ date Q / t ") , 1
Rootcorp, etro Denver Inc. Owner
nr signing, this agreement, it is underatoed that this shall become a legalh binding contract. Pan meat for abot r stork shall he title ulxmn completion. hi the event that
Payment is not receir ccl trithin if.) days after completion, any remaining balance shall be suh't
seel to a late lee of 1.5`n per month from the da} of completion. Customer
hall Iso be responsible tin the cost oI ec 11 ening said debt and a ill be additionally liable Icer all court costs, collection tgency and attornec< legal tccs.
Custot,ter shall hare the right to cancel this a rccntcnt in rviting •rithin 3 darn of signing.
Dane Lovett
From:
no-reply@ci.wheatridge.co.us
Sent:
Wednesday, August 23, 2017 9:12 AM
C
To:
CommDev Permits
Subject:
Online Form Submittal: Residential Roofing Permit Application
—�-�
Follow Up Flag: Follow up
Flag Status:
Completed
Residential Roofing Permit Application
C
This application is exclusively for new permits for residential roofs and for licensed
-Y
contractors only. This type of permit is ONLY being processed online --do not come
a
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
Cb
your contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a Yes
residential roof?
How many dwelling units Duplex
are on the property?
PROPERTY INFORMATION
D�
Property Address 3150 - 3160 Lamar St
Property Owner Name Nathan Burns
Property Owner Phone 303-808-3403
Number (enter WITH
dashes, eg 303-123-4567)
13
Property Owner Email
Address
Do you have a signed
contract to reroof this
property?
Applications cannot be
submitted without an
executed contract
attached below.
Attach Copy of Executed
Contract
nathan.p.burns@gmail.com
Yes
3150-3160 Lamar St.pdf
Contractor Business
Roofcorp Of Metro Denver, Inc.
Name
D l__ -
Contractor's License
021001
Number (This is a 5 or 6
Project Value (contract
digit number for the City
value or cost of ALL
of Wheat Ridge)
materials and labor)
Contractor Phone
Number (enter WITH
dashes, eg 303-123-4567)
Contractor Address
(Primary address of your
business)
303-766-2444
6890 S Tucson Way Ste 106
Contractor Email Address permits@roofcorpinc.com
Retype Contractor Email permits@roofcorpinc.com
Address
DESCRIPTION OF WORK
TOTAL SQUARES of
56
the entire scope of work:
Project Value (contract
20000
value or cost of ALL
materials and labor)
,
Are you re -decking the
No
roof?
14
Does the scope of the
project include a flat roof
(less than 2:12 pitch)?
Does the scope of the
project include a pitched
roof (2:12 or greater
pitch)?
How many squares are
part of the pitched roof?
Describe the roofing
materials for the pitched
roof:
Type of material for the
pitched roof:
Provide any additional
detail here on the
description of work. (Is
this for a house or
garage? What is the roof
pitch? Etc)
No /
Yes
3e
Dimensional 30 Yr
Asphalt
3150-3160 Lamar St - 2 addresses one structure - Remove all
roofing materials / replace roof
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work
may not begin on this
property until a permit
has been issued and
posted on the property.
Yes
Yes
Yes
15
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
I attest that everything Yes
stated in this application
is true and correct and
that falsifying
information in this
application is an act of
fraud and may be
punishable by fine,
imprisonment, or both.
Name of Applicant Stuart Webb
Email not displaying correctly? View it in your browser.
16
�.i CITY OF WHEAT RIDGE J
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office - (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: .,
Job Address:Mme-
Permit Number:
❑ No one available for inspection: Time AM/PM
Re -Inspection required: Y@s No
When corrections have been made, call for re -inspection at 303 -234 -
Date: %i 1 Inspector:.
DO NOT REMOVE THIS NOTICE
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: /t/?`I 0
Job Address: 2l (U L S -
Permit Number: 'Z U1 -7u
❑ No one available for inspection: Time AM/f_ll
Re -Inspection required: Yes rNo
When corrections have been made, call for re -inspection at 303-234-5933
Date:
7// Inspector:
DO NOT REMOVE THIS NOTICE
7500 WEST 29TH AVENUE . WHEAT RIDGE, COLORADO 80215
DATE:
July 1, 2003
TO:
Accounting Department
The City of
CWheat
<Ridge
FROM:
Alan White, Director of Community Development Dept.
SUBJECT:
FINAL ESCROW REFUND/RELEASE
Rcimbursement requested for final escrow funds being held for:
3040-50 Lamar SL 3100-10 Lamar St..
3150-60 Lamar St.
The Landscaping has been completed to the City of Wheat Ridge satisfaction.
RELEASE TO:
Address:
Neil J. Boucher. Jr.
16869 W. 55'h Dr.. Golden. CO 80403
Amount to be refunded: $ 3.375.00
iL~
Alan White
Director of Commnnity Development Department
(303) 234-5900 . ADMINISTRATION FAX: (303) 234-5924 . POLICE DEPARTMENT FAX: (303) 235-2949
Date:
/r1,/;d/~
A Certificate of Occupancy or Completion has been requested for:
AODlu:ss: 3! SD - fao ~ Sf.
PUI!POS[Or8TI!UCTUI![: ~ -J.!I2J(.dJ(!.o~/P~ ~'fs.
Remarks:
CJL- (j_
/II ()f(
Building Department Approval:
Zoning Approval:
JL~3tz--
( (
Remarks:
Public Works Approval: J- ~ I YJliJ/7~'2--
Remarks:
Fire Marshall Approval:
(If Applicable)
Remarks:
Sanitation District Approval:
(If Applicable)
Remarks:
Water District Approval:
(If Applicable)
Remarks:
INSPECTIONS WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE BUILDING SITE
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
JOB ADDRESS 3J$tJ - (;0 ,-",,_,,1'" ST-
BUILDING PERMIT NO. J t.j if 7 g DATE ISSUED
OWNER &j~ajj.LO f!6fk..A5>, LLL
CONTRACTOR .) .e~r"1A S Co rl J ,..... C 1,-0".
SETBACKS FROM PROPERTY LINES: NORTH SOUTH
WHEAT RIDGE, COLORADO
7500 WEST 29th AVENUE (303) 234-5933
INSPECTION RECORD
~:Lbd~~
. 1.
TYPE OCCUPANCY
EAST
WEST
INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB
INSPECTION I DATE I INSPECTOR
Foundations
Footings ..
Caissons
Reinforcing or Monolithic
Weatherproofing
POUR No CONCRETE UNTIL ABOVE HAS BEEN SIGNED
Concrete Slab Floor:
Electrical (Ground Work) 11
Plumbing (Ground Work)
Heating (Ground Work)
Do NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED
Rough Electrical -C :5eNte,s ~- i# }","b...- # r
Rough Plumbing d1L- .f, ( .A ,
Air Test Gas Piping (f)T- -' I- '7 1fi7. .....
Rough Heating & Ventilation t7
I~aming
L.!r2.sulation
~~I 1 ~~!O~
~
Drywall Nailing
Roofing
Refrigeration
Electrical Underground
.?
c:::
Final
Electrical i S- c> - 3 I Il
Plumbing
Heating & Ventilation
Frame
R.O.W. & Drainage
Fire Department
Parking & Landscaping
OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF
OCCUPANCY IS ISSUED
PROTECT THIS CARD FROM THE WEATHER
Building Permit Number: 14478 _J
Address:
3150-60 LAMAR ST
--~~~
Description:
NEW HANDICAP RESIDENDIAL UNITS
Inspection List
I Number ]I Type I Date Remarks
36899 INS 10/30/2002 OKlBG
36932 DWS 11/4/2002 ok/ba
37389 FE 12/11/2002 ok/bb
37390 FP 12/11/2002 OKlBG
37391 FM 12/11/2002 OKlBG
37392 FB 12/11/2002 OKlBG EXCEPT GRADE IN BACK
37393 F-PW 12/11/2002 OKlMJG 12/17102
37394 F-LANDSCAPE 12/11/2002 OKlMP 12/13/02. ESCROW FOR SOD. TREES ARE IN.
37519 F-LANDSCAPE (ESCROW EXP 4/1/2003
39465 F-LANDSCAPE (ESCROW REL 6/16/2003 OKlMP 6/16/03
FIND
Landscape Escrow A~reement
-,~:i WHEA I' 1'/
'- '"
- C>
U '"
CO(OR~\,o
City of Wheat Ridge Planning and Development
Department
This agreement made this 2.:;}::: day of /):>.N.." i. v ,20 Ol. by and between the City of
Wheat Ridge and S"'<:-'- \/,,1 ~ l-k "'-'-. . t. L c... (contractor/devetoper/owner).
~
Escrowintheamountof -/hr<.-t.. -n...o...;.~.l -!tv... h...~cl-<..1 ~<..v.....h,-'<....DOLLARS
($ '3,:' 7 S" ) is being held until all landscaping improvements are completed at,
30'10, lo.l.-O /3/00,3 II 0.1.1 / ~7:>, JIb 0 L,., ""....- s+-o
I r
In the event that landscaping required by Wheat Ridge Code of Laws, Section 26-502
and/or as shown on an approved landscape plan is not installed
bY~ /, 2nn1- ,(date) the City of Wheat Ridge or its designee shall
have t e right to enter upon said property to construct and/or install such improvements
or do other such work to accomplish that purpose as may be necessary, provided that the
City of Wheat Ridge shall first give notice in writing to the contractor, developer or
owner of its intent to do so.
If the City of Wheat Ridge exercises its right to perform work of any nature, including
labor, materials and use of equipment either by force account or contract, the City shall
have the absolute right to withdraw th.e escrow fi.;"ds to complete said landscape
improvements. The only precondition to the City's right to withdraw the escrow funds
for this purpose shall be a letter from the Planning and Development Director, stating that
the landscape improvements have not been completed or provided and that the
compliance date of ~ '.' 2.tJo~ has expired.
Approved and Agreed:
ContractorlDeveloper/Owner
~t{
'~"I;Jt..
.
2<'1'1'19 t:. 11.7'" /,1.
C.-.-<:"
. Signature
Co &.s~f;
Print Name
fSr:rl.,-k;.r.,
Business Address
c...o
R> & D3
11- Z (,'Oz.
Date
I'r.:Jj~c- + S v,a.Lr.
Title
City of Wheat Ridg;e, Colorado
By: dti IJJ/iiz:
Title: f/"MY1I'AJ + f):1Jf!rpJ.J1! !Jlfc'lv-
Date: (y~oz-
Ii
Dubois Tree Service, Inc.
6280 Quay Street
Arvada, CO 80003
456-6678
II- C). S -0 2...
--J;;c(I1Ylf'kk 50d -J:;Y"' 3tJlltJ; 30.s~ 31o~ S"O, SISS 5J(PO LaWlQr-':W
_)/ Sf ert7 . J' * '1 ~
/07'u C~5-1-W;//U Y-SeJ-ellc4- w/t/t;{ ep.l..lI cX7ltl.
,~;;j tv
/~ -
<~e_~ L. j j)<;3.
.
n,1,
Oy~ '
,~'
~'j
I
~
(;1};
82-58011070 5471
7872509768
DAm ll-~^~
MEMo
...
.
,
DEPARTMENT OF PLANNING AND DEVELOPMENT
BUILDING INSPECTION DIVISION - 235-2855
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215
Building Permit Number: 14478
Date: 9/11/02
Property Owner: SAGE VALLEY HOMES, LLC
Property Address: 3150-60 LAMAR ST
Contractor License No.: 20384
Company: JEAKINS CONSTRUCTION
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
Phone: 238-2491
Phone: 238-2491
I hereby certify that the setback distances proposed by this permit application are accurate, and do
not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants,
easements or restrictions of record; that all measurements shown, and allegations made are
accurate: that I have read and agree to abide by all cooditions printed on this application, and that I
assume full responsibility for compliance with the Wheat Ridge Building Code (U.B.C.) and all
othor applicabte Wheat Ridge ordinances, for work under this permit.
(DWNER)(CDNTRACTDR) SIGNED ~ C ........cOATE 9-/?-Ol
Construction Value:
Permn Fee:
Plan Review Fee:
Use Tax:
$291,714.00
$2,068.95
$1,344.82
$3,500.57
$6,914.34
Total:
Use:
Description :
NEW HANDICAP RESIDENDIAL UNITS
BUILDING DEPARTMENT USE ONLY
tQnmo~nt$:
Approval: MP
Zoning: R-2
d._" CornnJents:
Approval: OK DM
Publll;:Works Comment$:
Approval: MLG
SIC:
Sq.Ft. :
9/9/02
9/9/02 PER REDLlNES
9/9/02 PER ATTACHED AND COMMENTS
Occupancy:
Walls:
Roof:
Stories :
Residential Units :
Electrical License No: 18711
Company : Courtesy Electric
Expiration Date: 2/28/03
Approval: OK/KS
'.
Plumbing Licens No:
Company :CCI PL
Expiration Date .
Approval'
Mechanical License No : 21209
Company: MLS Air Condnioning
Inc.
Expiration Date : 2/22/03
Approval: OK/KS
- (1) This permit was issued in accordance with the provisions set forth in yopur appl ion and is subject to the laws of the State of Colorado and to the Zoning
Regulations and Building Code of Wheat Ridge, Colorado or any other applicable ordinances of the City.
(2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building authorized is suspended or
abandoned for a period of 120 days.
(3) "this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be made in the
original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes are made or if suspension or abandonment
exceeds one 0) year, full fees shall be paid for a new permit.
(4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
(5) Contractor shall notify the Building Inspector twenty-.four (24) hours in advance for all inspections and shall receive written approval on inspection card before
proceedling with successive phases of the job.
(6) The issuance of a permit or the approval of drawings and speCifications shall not be construed to be a pennit for, nor an approval of, any violation of the
pro~sion. of the bu' ~ other ordinance, law, rule or regulation.
DEPARTMENT OF PLANNING AND DEVELOPMENT
BUILDING INSPECTION LINE - 303-234-5933
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215 - (303-235-2855)
Building Permit Number:
Date:
14478
9/11/02
Property Owner: SAGE VALLEY HOMES, LLC
Property Address: 3150-60 LAMAR ST
Contractor License No.: 20384
Company: JEAKINS CONSTRUCTION
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
Phone: 238-2491
Phone: 810-6230
I hereby certify that the setback distances proposed by this permit application are accurate, and do
not violate applicable ordinances, rules or regulations of the Crty of Wheat Ridge or covenants,
easements or restrictions of record; that all measurements shown, and allegations made are
accurate; that I have read and agree to abide by all conditions printed on this application, and that I
assume full responsibility for compliance with the Wheat Ridge Buitding Code (U.B.C.) and all
other applicable Wheat Ridge ordinances, for work under this permit.
Construction Value:
Permit Fee:
Plan Review Fee:
Use Tax:
$291,714.00
$2,068.95
$1,344.82
$3,500.57
$6,914.34
(OWNER)(CONTRACTOR) SIGNED
DATE
Total:
Use:
Description :
NEW HANDICAP RESIDENDIAL UNITS
BUILDING DEPARTMENT USE ONLY
Zoning Comments:
Approval: MP
Zoning: R-2
Building Comments:
Approval: OK DM
Public Works Comments:
Approval: MLG
SIC: Sq. Ft. :
9/9/02
9/9102 PER REDUNES
(ft(Oz,.
q ~
Occupancy:
Walls:
Roof:
Stories:
Residential Units :
Electrical License No: 18711
Company : Courtesy Electric
Expiration Date: 2/28/03
Approval: OK/KS
Plumbing License No : 21402
Company :A BUMBLEBEE
PLUMBING INC
Expiration Date: 8/31/03
Approval: DM
Mechanical License No : 21209
Company: MLS Air Conditioning
Inc.
Expiration Date : 2/22/03
Approval: OK/KS
(1) This permit was issued in accordance with the provisions set forth in yopur application and is subject to the laws of the State of Colorado and to the Zoning
Regulations and Building Code of Wheat Ridge, Colorado or any other applicable ordinances of the City.
(2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building authorized is suspended or
abandoned for a period of 120 days.
(3) If this permit expires, a new permit may be acquired for a fee of one.half the amount normally required, provided no changes have been or will be made in the
original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes are made or if suspension or abandonment
exceeds one (1) year, full fees shall be paid for a new permit.
(4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
(5) Contractor shall notlfylhe Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card before
proceediing with successive phases of the job.
(6) The issuance of a permit or the approval of drawings and specifications shall not be construed 10 be a permit for, nor an approval of, any violation of the
provisions of the building codes or any other ordinance, taw, rule or regulation.
Chief Building Inspector
09/18/2002 10:14 303-~33-8575
CCI PLUMBING
PAGE 01
CCl CPLV~(]Jl!Nq.MllD ~fJ1!Nq 1!NC.
99491111 2J'lH ~~
.cJl7CE%bOD, CO 80215
303-233-8199 . PM 303-233-8575
~i~
FROM:~- Qro.~
DATE: ~ ~. aa::;;..
'fO:
FAX#: ~-;;J05-!J~1
RE:
MESSAGE:
LfO lD..~ ~ OOJ\) LNUl.J.. If-mv J
~ # I~h~
d~J51ld) ~ vJt
Ll1:. uJu..L (JUX.t- 0- ~ I.ffu ~
~~~
DEPARTMENT OF PLANNING AND DEVELOPMENT
BUILDING INSPECTION LINE - 303-234-5933
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215 - (303-235-2855)
APPUCATlON
Building Permit Number;
Date: . J(\ 'b
)v\
Property Owner:
Property Address:
Contractor License No.:
Company:
~,~ V d&, /}ri.CY,"-,<J -/,/12. '.
p./,) ~~~4<-~c,.,
,:;J.d3.i7!
4uJ"~>:., C~t~L,-:;
~15D' 31"0 U....-- Sj.._
- Phone.: 303''?Y'd4t;j
Phone: ?i." ;)3J'. ,;)<11/
OWNERJCONTRAcrOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
COnstruction Value: t"f/,7,'#.tJO
. Permit Fee: '2-C>t>g, '1..>
Plan Review Fee: 'ieS ,I~W_~
Use Tax: .3';'00, 1'7
Total:
I
I hereby certify that the setback distances proposed by this permit application arc"'
accurate, and do not violate applicable ordinances, rules or reg"uations of the City of
Wheat Ridge or covenants, easements or restrictions of record; that all measurements
sho'iVn, and .aIlegatioDS made ~e a..ccurate; that I have read and .agree to abide by all
conditioDS printed on this application and' that I assume full responsibility. for
compliance with the Wheat Ridge Building Code (U.B.C) and all oilier applicable
'Wheat Ridge Ordinances. for work: under this permit.
(OWNER)(CON1RAcroR):srGNED L~n1t... /lsf.~L. DAlE /O/'>'>I(q
/'Q>~~r ~ .
C"4r~'~ C-J ((Jj,;i1 0
Description:
BUILDING COMMENTS:
Approval:
/:') . A /,
SItf.(0,_:\l Sq.~;-~
0. C"" J.c, I
. IC)-c...,.//.<., 1--,-,
iH -4~/ ;':, ~,(."",{) [j.t
~ V' <,,6 <i/.:4:..,
"" ~ Wz- Pv jUl;" ~~,':;/j
PUBLlCWORKSCOMMENT@wlf> '9/<1/oZ- - ~>t s;,..... 4d..J 1..:'),_,
Approval; ~i/eo"""-1J
BUILDING DEPARTMENT USE
ZONING COM~ENTS: 1)
Approval; Nf
. Zop,ing: rz. - Z--
1/rvr-
Occupancy:
Walls:
Rqof:
Stories:
Residential Units:
Expiration Date:
Approval:
11;t11
{O"u'fCS(j
.. I~ 9["?'
"'=-~.--
0'7 ' .r::::.....;::::~se No: /7\' 2 D l\
CCi I~ I (l1."x . Company: . if. _'.
:J ;~l-'7 ^lv
'7/01/ Expiration Date: \z,.\v~ \e:>
Approval:
Expiration Date;
Approval:
(1)
(2)
(3)
This pCLmit was uSlled in accordance with the provisions set forth in your applicatib.c. and is :ubjcct to the laws oithe State of Colorado and to the Zoning
RegulatiollS and Building Codos ofWh.eat Ridge, Colorado or any other applicable ordinances of the City.
'!his p~t sh.all e~ire if (A) the work autnonzcd is not commenced v,rithin sixty (60) day! from issue date or (B) the building authorized is suspec.ded or
"abandoucd for a period of 120 days.
If'this pen:oit expire:s, anew permitIIlay be acquitedfor a. fee ofo.o.evhalfth.e amount normally required, provided no changea have been crwill be made in
the original pla,n.s and specifications a.o.d any su.spellSionor abandonmentha.a notexceededono (1) year. If changes lu...e beec. or ifsuspension or abandonment
exceeds on.e (1) year, full fees shall be paid fot a. new permit
No work of any manner sha.Il be done that will change the natural flow ofWil.ter causing a. drama.ge problem.
Contractor shallo.otify theBulldingInsp'ectortvr'euty.four ('24) houn in advance for allinspections and!hall receive written lpproval 0lJ. inspection card befote
proceeding'>'litb. successive phases oftb.e job, . .
The iuttance of a pemrlt or the approval of drawings and specifications shall not be construed to be a pec:nit for, oar an approval. of, any violation of th!:l
proYisioua of the bull' code.! or my other ordin.ance~ law, rule or regulation. .
(4)
(5)
(')
City of Wheat Ridge
Planning and Development Department
Memorandum
TO: Sage Valley Homes
FROM: Michael Pesicka
SUBJECT: Lot 19, Jalamar Subdivision
DATE: August 30, 2002
After reviewing your plans for duplexes located in the Jalamar Subdivision I have the following
comments and revisions,
1. If you intend to erect a fence on your property, you can submit a fence permit from the City,
Fences must meet all setback, height and site triangle requirements.
2. Please provide a deed with your submittal to prove ownership,
If you have any questions please call me at 303-235-2845.
Thank you,
Michael Pesicka
Planning Technician
November 13, 2001
BUILDING INPSECTION DIVISION
Code Correction List
Owner:
Sage Valley homes LLC
Builder:
Jeakins Construction LLC
Address:
Description:
3125-3135,3145-3155 Kendall St.
3040-3050, 3100-3110, 3150-3160 Lamar St.
New Duplex (Five)
1. Caisson footings are not indicated on stamped foundation plans.
2. Provide a letter and updated plans for the unit that will be made handicap accessible to
meet state accessibility requirements. One unit of the ten will be required to be made
handicap accessible.
3. Provide a note stating water heaters are to be installed with drain pans under them.
4. Indicate all windows types and sized proposed.
5. Show size and location of crawl space vents proposed.
6. Show flue and combustion air sizes and locations.
7. Label one-hour separation between garage and house.
8. Have stamped foundation plan detail proposed party wall ledger as indicated on sheet S2.
9. Label all outlets required to be GFCI protected per NEC requirements.
10. Provide a site plan showing sewer and water lateral sizes and locations, Note each unit will
require a 0/." water meter with a one-inch service line.
11. Label underside of stairs used as storage will require one-hour fire resistive construction.
12. Provide deck construction plans and material proposed.
Please make these additions or corrections to the submittal and resubmit for review, if you have
any questions or comments please feel free to contact me at 235-2853.
GNSOLIDATED
mutual water
"'~ ~
August 21, 2001
Jeakins Construction
2232 Lamar Street
Edgewater CO 80214
RE: Water Availability & Costs for Lots 19, 20, & 21, Jalamar Subdivision
(On Lamar Street between West 30th Avenue & West 3200 Avenue)
Donna:
The above-mentioned property is in an area served by The Consolidated Mutual
Water Company by virtue of a Distributors' Contract with Denver Water. Water
service is available to this property subject to compliance with the Company's
rules, regulations and requirements for such service as well as the water tap
requirements established by Denver Water.
A separate tap, service line and meter will have to be installed for each side
of the proposed duplexes. The following costs apply to each tap:
Five (5) shares of Consolidated Stock
%" Standard Duty Meter Package
$ 7,000.00
347,00
Tapping Saddle
ranges between
23,00 - 57.00
These prices are subject to change without notice.
You will need to contact Denver Water for any appropriate fees that they may
require.
Please give me a call if you have any additional questions.
Sincerely,
M~~ai~
Secretary-Treasurer
THE CONSOLIDATED MUTUAL WATER COMPANY
12700 West 27th Avenue . P.O. Box 150068' Lakewood. Colomdo 80215
Telephone (303)238-0451' Fax (303)237-5560
, :r- . , ",High Plains Engineering
'''" .' 1'1\\.1....
.
735 Denver Avenue . Fort Lupton CO 80621
Phone 303-857-9280 . Fax 303-857-9238
SUBSURFACE INVESTIGATION AND FOUNDATION
RECOMMENDATIONS
Prepared For:
Jeakins Construction
2232 Lamar Street
Edgewater, CO 80214
Job Site Located At:
Lot 19
Jalamar Subdivision
Jefferson County, CO
September 14,2001
JOB # 01-1442
..
I PURPOSE:
This report reflects a soil and foundation investigation from soil borings to
determine the subsurface soil identification, and to determine the physical
characteristics ofthe soil for a suitable foundation design, The foundation is
to support a one to two story duplex.
I LOCATION AND SITE CONDITIONS:
This report represents the results of the data obtained during the subsoil
investigation for the proposed house at Lot 19, Jalamar Subdivision,
Jefferson County, CO.
The site is presently a vacant lot. The site is reasonably level with slopes of
0.5% to the West. The lot appears to be well drained with no erosion
evident.
The depths offoundation construction are anticipated to range from two (2)
to four (4) feet below grades that existed at the time of this investigation. It
is anticipated that final grades may be adjusted to accommodate drainage
and construction depths. It is recommended that we review the fmal grading
plan to determine if any revisions to the recommendations presented in this
report are necessary.
I SUBSOIL CONDITIONS:
One, four inch diameter hole was drilled to a depth of fifteen feet at the
building site on September 10, 2001, as shown on the attached site map.
Samples of the soil were taken at two-foot intervals. These samples were
analyzed in the field and laboratory to determine the characteristics of the
soil for identification and foundation design. In general, the soil profile in
test hole #1 indicated Sandy Silt (SM) to a depth of3 feet, then Sandy Clay
(SC) to a depth of6 feet. Clay with Medium Plasticity (CL) exists from 6
feet to 15 feet. The Standard Penetration Test similar to ASTM D1586
showed 8 blows for 12-inch penetration, at a depth of 4 feet and 17 blows
for a 12-inch penetration at a depth of9 feet. No free water was encountered
during the drilling operation.
One-dimensional swell/consolidation tests were performed on selected
samples to evaluate the expansive, compressive and collapsing nature of the
soils and/or bedrock strata. These tests indicated a swell potential of 0.1 % at
a depth of 4 feet, and a swell potential of 4.0% at a depth of9 feet. The soils
in this report were classified using the American Society of Testing
Materials (ASTM) procedures.
I FOUNDATIONS RECOMMENDATIONS:
The Sandy Clay (SC) material has a bearing strength of 2000 psf and an
equivalent liquid pressure of 50 psf. We recommend the use of a continuous
spread footing, due to the low swell-consolidation potential of the analyzed
soils.
All loose and disturbed soil shall be removed before placing of the concrete
for the foundation. The bottom of the foundation shall be a minimum of
three feet below final grade for frost protection and below any organic
material.
I FOUNDATION DRAIN:
It is recommended to install the "Edge System" drain system by G. F.
Drainbuilders, Corp. (303-805-8751). This system is warranted and
engineered by G. F. Drainbuilders, Corp. No warrantee is neither expressed
nor implied by High Plains Engineering, Inc.
I SLAB ON GRADE CONSTRUCTION:
I. Where slabs-on-grade are chosen and the owners are willing to accept
the risks associated with slab movement, the following
recommendations should be followed:
a.) The slabs should be isolated from all structural components and
utilities which penetrate the slab. Isolation may be achieved with
Y2 inch isolation material or by sleeving.
b.) Eliminate under slab plumbing where feasible. Where such
plumbing is unavoidable, it should be pressure tested during
construction to minimize leaks, which would result in wetting of
the sub soils.
c.) Place the slab directly on the undisturbed natural soils, or well
compacted fill soil. Slabs should be reinforced with wire mesh or
fibermesh to help control crack separation.
d. ) To avoid settlement and distortion of exterior slabs due to
improper compaction, we recommend that concrete slabs should be
doweled to the foundation wall. The slab should be reinforced as
necessary for the span involved,
2. Provide frequent scoring ofthe slabs to provide joints for controlled
cracking of the slab. Control joints should placed to provide
approximate slab areas of 150 square feet. The depth of sawed
control joints should be Y. of the slab thickness.
3. A minimum void or clear space of 1 Y, inches should be provided at or
near the bottom of all non-bearing partitions. In finished room areas,
all drywall and paneling should be stopped approximately 1 Y, inches
above the top of the slab. This will allow some space for upward
movement of the slab before pressures are applied to the wall and
upper levels of the structure. The builder should provide a Y, inch
space at the bottom of all doorjambs to allow for limited movement of
the floor slab. The owner is hereby notified that it is their
responsibility to maintain these void spaces.
4. Proper drainage away from the foundation walls should be provided.
A minimum slope of 12 inches in the first 10 feet out from the
building is recommended, Roof downspouts and sill cocks should
discharge into long concrete splash blocks (5 feet long) or into metal
gutter extensions to deposit runoff water beyond the limits ofthe
backfill soil near the foundation walls. The foundation and retaining
walls should be well cured, damp proofed, and well braced prior to
backfilling.
5. Steel reinforcement will be required in the footings and foundation
wall. This will give the walls beam strength to span or bridge over
any loose or soft pockets of soil not found in our exploratory holes or
that may develop during construction. This should also help prevent
any differential movement ofthe foundation system.
I CONSTRUCTION DETAILS:
In any soil investigation, it is necessary to assume that the subsurface soil
conditions do not vary greatly from the conditions encountered in the field
and laboratory testing. The accompanying design is presented using best
professional judgment based on the limits of the extent of testing
commissioned by the client. Our experience has been that at times, soil
conditions do change and variations do occur. These may become first
apparent at the time of excavation for the foundation system.
If soils conditions are encountered which appear different from the test
borings as presented in this report, it is recommended that this office be
called to inspect the open excavation prior to placing the footings. This
inspection is not part of the report.
The foundation and retaining walls should be well cured and well
braced prior to backfilling.
I DISCLAIMER:
THE PARTIES SPECIFICALLY AGREE THAT HIGH PLAINS
ENGINEERING, INC. HAS NOT BEEN RETAINED NOR WILL THEY
RENDER AN OPINION CONCERNING ANY ENVIRONMENTAL
ISSUES, HAZARDOUS WASTE OR ANY OTHER KNOWN OR
UNKNOWN CONDITIONS THAT MAYBE PRESENT ON SITE.
Blowcounts 8/12 _
Blowcounts 17/12 _
o
SANDY SILT (SM)
2
3
4
SANDY CLAY (SC)
5
6
7
8
9
10
11
12
13
14
15
SOIL PROFILE
CLAY WITH MEDIUM PLASTICITY (CL)
z
o
i= 4%
C3
:J
55 2%
z
o
~
....J
W
$:
en
f- -2 %
z
w
C,)
ffi -4 %
lL
o
%-- ----.._---- - , - - ---- __no.
i
I
Yo - ------ -- I -------
-- I ..---- ~--- ..----------.-- ---------
I
I
I
I
W,..-rrP ~"---- ~OI2
^j)/)ffi(J r---- ~1l6'"T
,
I
,
i
j I
J
I i
;
,
SOIL I ES liNG SlJMMAIW
12
100
8%
6%
-6 %
-8%
-10%
-12%
100 500 1000 2000 3000 10000
LOAD (PSF)
HOLE # DEPTH L.L P.L P.I % SWELL "OONSOLIDATION REMARKS
I
J
t-/
~
:511" i
0.170
------------.
'51'\<10'1 al'li(-',~)
'-jJ.(g 2~.e, /8.9
'1.07..
c.....AiW',.'~ Me"'''''"'
PlAs11 <, 1-{ <: t:..l..)
JOB NO. CJ 1-1'-'42
DATE: q-I~I'''I
DRAWN: .."."",
CHECKED:
HIGH PLAINS
ENGINEERING
735 DENVER AVE.
FT. LUPTON, CO BOO21
PHONE: 30:3-857-9280
FAX: :J03.ll57.!l238
SWELUCONSOLlDA TJON TEST RESULTS
PROPERTY AT: t...01 ,~
:r,..lfI/VlA12. S"l:.c); .,-..IN
.j 4UN1'1,CD
LEGEND
. - Percolation Holes
x - PereolalionProfile Hole
b,..- Soi I Profile Hole
Sll'E MA P
JRr"'- .'
It; -
II
L..oi ,ct
:r"UlIM"a. $ubJ.....'s/cJl\)
;:rcC:~CiG.So';u U,UIIH'ft CD
. 1--
-
~-
~j
r. 1-\
: ..a,
i
- .
-i g) " C(~
, .' b - f
.('-....- f___
....
V)
::f
i
, .3lt
.
"( .' 'l~' ,;,High Plains Engineering
'-'" . \'"~ 735 Denver Avenue. Fort Lupton CO 80621
Phone 303-857-9280 . Fax 303-857-9238
SUBSURFACE INVESTIGATION AND FOUNDATION
RECOMMENDATIONS
Prepared For:
Jeakins Construction
2232 Lamar Street
Edgewater, CO 80214
Job Site Located At:
Lot 1 9
Jalarnar Subdivision
Jefferson County, CO
September 14,2001
JOB # 01-1442
.
[ PURPOSE:
l
This report reflects a soil and foundation investigation from soil borings to
determine the subsurface soil identification, and to determine the physical
characteristics of the soil for a suitable foundation design. The foundation is
to support a one to two story duplex.
I LOCATION AND SITE CONDITIONS:
This report represents the results of the data obtained during the subsoil
investigation for the proposed house at Lot 19, Jalamar Subdivision,
Jefferson County, CO.
The site is presently a vacant lot. The site is reasonably level with slopes of
0.5% to the West. The lot appears to be well drained with no erosion
evident.
The depths offoundation construction are anticipated to range from two (2)
to four (4) feet below grades that existed at the time ofthis investigation. It
is anticipated that fmal grades may be adjusted to accommodate drainage
and construction depths. It is recommended that we review the final grading
plan to determine if any revisions to the recommendations presented in this
report are necessary.
I SUBSOIL CONDITIONS:
One, four inch diameter hole was drilled to a depth of fifteen feet at the
building site on September 10, 2001, as shown on the attached site map.
Samples ofthe soil were taken at two-foot intervals. These samples were
analyzed in the field and laboratory to determine the characteristics of the
soil for identification and foundation design. In general, the soil profile in
test hole #1 indicated Sandy Silt (SM) to a depth of3 feet, then Sandy Clay
(SC) to a depth of 6 feet. Clay with Medium Plasticity (CL) exists from 6
feet to 15 feet. The Standard Penetration Test similar to ASTM D1586
showed 8 blows for 12-inch penetration, at a depth of 4 feet and 17 blows
for a 12-inch penetration at a depth of9 feet. No free water was encountered
during the drilling operation.
One-dimensional sweIVconsolidation tests were performed on selected
samples to evaluate the expansive, compressive and collapsing nature of the
soils and/or bedrock strata. These tests indicated a swell potential of 0.1 % at
a depth of 4 feet, and a swell potential of 4.0% at a depth of9 feet. The soils
in this report were classified using the American Society of Testing
Materials (ASTM) procedures.
I FOUNDATIONS RECOMMENDATIONS:
The Sandy Clay (SC) material has a bearing strength of 2000 psfand an
equivalent liquid pressure of 50 psf. We recommend the use of a continuous
spread footing, due to the low swell-consolidation potential of the analyzed
soils.
All loose and disturbed soil shall be removed before placing of the concrete
for the foundation. The bottom of the foundation shall be a minimum of
three feet below [mal grade for frost protection and below any organic
material.
I FOUNDATION DRAIN:
It is recommended to install the "Edge System" drain system by G. F.
Drainbuilders, Corp. (303-805-8751). This system is warranted and
engineered by G. F. Drainbuilders, Corp. No warrantee is neither expressed
nor implied by High Plains Engineering, Inc.
I SLAB ON GRADE CONSTRUCTION:
I. Where slabs-on-grade are chosen and the owners are willing to accept
the risks associated with slab movement, the following
recommendations should be followed:
a.) The slabs should be isolated from all structural components and
utilities which penetrate the slab. Isolation may be achieved with
Y2 inch isolation material or by sleeving.
b.) Eliminate under slab plumbing where feasible. Where such
plumbing is unavoidable, it should be pressure tested during
construction to minimize leaks, which would result in wetting of
the sub soils.
c.) Place the slab directly on the undisturbed natural soils, or well
compacted fill soil. Slabs should be reinforced with wire mesh or
fibermesh to help control crack separation.
d.) To avoid settlement and distortion of exterior slabs due to
improper compaction, we recommend that concrete slabs should be
doweled to the foundation wall. The slab should be reinforced as
necessary for the span involved.
2. Provide frequent scoring of the slabs to provide joints for controlled
cracking of the slab. Control joints should placed to provide
approximate slab areas of 150 square feet. The depth of sawed
control joints should be V. of the slab thickness.
3. A minimum void or clear space of I Y, inches should be provided at or
near the bottom of all non-bearing partitions. In fInished room areas,
all drywall and paneling should be stopped approximately I Y, inches
above the top of the slab. This will allow some space for upward
movement of the slab before pressures are applied to the wall and
upper levels of the structure. The builder should provide a Y, inch
space at the bottom of all doorjambs to allow for limited movement of
the floor slab. The owner is hereby notified that it is their
responsibility to maintain these void spaces.
4. Proper drainage away from the foundation walls should be provided.
A minimum slope of 12 inches in the first 10 feet out from the
building is recommended. Roof downspouts and sill cocks should
discharge into long concrete splash blocks (5 feet long) or into metal
gutter extensions to deposit runoff water beyond the limits of the
backfill soil near the foundation walls. The foundation and retaining
walls should be well cured, damp proofed, and well braced prior to
backfilling.
5. Steel reinforcement will be required in the footings and foundation
wall. This will give the walls beam strength to span or bridge over
any loose or soft pockets of soil not found in our exploratory holes or
that may develop during construction. This should also help prevent
any differential movement of the foundation system.
I CONSTRUCTION DETAILS:
In any soil investigation, it is necessary to assume that the subsurface soil
conditions do not vary greatly from the conditions encountered in the field
and laboratory testing. The accompanying design is presented using best
professional judgment based on the limits of the extent oftesting
commissioned by the client. Our experience has been that at times, soil
conditions do change and variations do occur. These may become fIrst
apparent at the time of excavation for the foundation system.
If soils conditions are encountered which appear different from the test
borings as presented in this report, it is recommended that this office be
called to inspect the open excavation prior to placing the footings. This
inspection is not part of the report.
The foundation and retaining walls should be well cured and well
braced prior to backfilling.
I DISCLAIMER:
THE PARTIES SPECIFICALLY AGREE THAT HIGH PLAINS
ENGINEERING,INC. HAS NOT BEEN RETAINED NOR WILL THEY
RENDER AN OPINION CONCERNING ANY ENVIRONMENTAL
ISSUES, HAZARDOUS WASTE OR ANY OTHER KNOWN OR
UNKNOWN CONDITIONS THA T MAY BE PRESENT ON SITE.
Blowcounts 8/12 _
Blowcounts 17/12 _
o
9
10
11
12
13
14
15
SOIL PROFILE
CLAY WITH MEDIUM PLASTICITY (CL)
z
o
~ 4%
:J
55 2%
z
o
~
....J
W
$:
en
f- -2 %
z
w
C,)
ffi-4 %
lL
o
," - , ,- - - --, u r-- --_ _ __
,
i
I
Yo - u__ ---.'- --- I--- I
-------------- ----- ---- --- _ ____u
I ---..- -
,
i
Yo I
I
Yo I
I
WI'< "ffP 10012
^fK>1ii(J ',- ''--. ~1lG._j
,
I I
I
I
j I
I
i
;
,
---.._.~.-
SOli IES liNe ::ilJMMAliY
120'
10'l
80
6 0
-6 %
-8%
-10%
-12%
100 500 1000 2000 3000 10000
LOAD (PSF)
.,-
HOLE # DEPTH L.L P.L P.I % SWELL ,. OONSOLIDATION REMARKS
I t-/
J ~
E'1Jg~G~~~
735 DENVER AVE.
FT. LUPTON, CO BOO21
PHONE: 30:3-857-9280
FAX: 30:3-857-9238
:511"
i
0.170
~-----------
'51'\<10'1 <:'L.1'I1C5~-)
SWELUCONSOLlDA TJON TEST RESULTS
PROPERTY AT: t...01/~
:r,..lfI/VlA12. s,,/:,c); .,-S.IN
.j 4>UN1'1, {"D
c.....Aiw".'~ Me()lH'"
plAsTle'1-{ ((..1...)
JOB NO, CJ 1-1'-142.
DATE: '1- '~I."I
DRAWN: -r''''''
CHECKED:
'-jJ.(g 2~.e, /8.9 '107..
LEGEND
. - Percolation Holes
x - Percolation Profile Hole
tl- SoH Profile Hole
Sl]'E MAP
L,..oi let
-y,,&.AM"a. $ubJ..,tS/ClIV
J"cc:P&"lZ.S<'...... ~1I~"f1 CD
~..
l~'
I
~~
r, '1---,
-a:
- .
-; t) " C--$,
f. b -,
,-'--'" f~__
.
-' ." _ .--. c.J
'\ '~... <..;
1, .... _ ).
~
,
. L-
~-
....
Vl
'::i
I
Jlt
DEPARTMENT OF PUBLIC WORKS
(303) 235-2861
7500 WEST 29TH AVENUE
.
WHEAT RIDGE, CO 80215
FAX (303) 235-2857
LETTER OF NOTIFICATION FOR PUBLIC IMPROVEMENTS RESTORATION
DATED
1t"!o7
, ,
ADDRESS 3//"D
1.<1.w6fL-S+. C~ 19 --.!I'<(f'tJff4AP-)
Dear Contractor:
In conjunction with the approval of the building permit application for the above referenced address. this
letter is to inform you that all existing public improvements located along the frontage of said address.
shall be restored, (if damaged from related construction) to an acceptable condition. as determined by
City of Wheat Ridge Public Works Department, and prior to the issuance of a Certificate of Occupancy.
Prior to any construction commencing, the City's representative will conduct an onsite inspection to
determiine the existing condition(s) of the public improvements at this address.
If you have any questions, please contact me at 303-235-2868.
Sincerely,
~~d~
Michael Garcia,
Development Review Engineer
cc: f:ile
Files on Enginent\Development Review/Forms & form letters\Notification of PI Restoration
Rev 05/00
DEPARTMENT OF PUBLIC WORKS
BUILDING PERMIT APPLlCA TION REVIEW
Date: 9, "'.0"2....
Location: .3 L lPt> I - - - <z-"'T.
Attention: Building Department
I have reviewed the attached materials submitted in application for approval of a #u..:r-' - ~~
at the above referenced address. Please note the summary comments below. '
1. I./'""
2. :............-
3. ...--
4..~
5. -./'
6. I./'""
7. ...........
8. -./'
9.~
1 0 . l,/'"
11. .............--
12.
13. ~
14. ~
Boundary Closure: ........-OK _ Not OK; refer to stipulations.
Drainage:
a. Drainage plan and report needed
b. Drainage plan not needed _
c. Lot drainage/grading to be reviewed by Building Division _
d. Site drainage/grading provisigns have been reviewed and are:
~K _ Not OK; refer to stipulations.
NPDES Permit Required: Yes -'-'" No
Public Improvements:
a. street paving needed: Yes-No
b. curb and gutter needed: Yes vo-No
c. sidewalk needed: Y es ~ No
d. street lights needed: Y es ~ No
e. storm sewer needed: Y es ~ No
f. letter of credit required: _ Yes ~No
If a letter of credit is required, for what improvements?
Amount of letter of credit:
Subdivision Agreement required: Yes
Development Covenant required: Yes
If Yes, for
Traffic impact analysis and report required: Yes
State Highway Access Permit needed: Yes
New roadway or alley R.O.W. dedication recommended: Yes
If yes, what is recommended?
All existing dedicated roadways/alleys meet the standards of the City:--=: Yes
Ifno, which do not and what is requested:
APPROY AL: The Public Works Department has reviewed this request and hereby gives its
approval subject to the above and/or attached stipulations.
"IJJ" L
Date
"'-- No
...:=:: No
':::::..... No
..... No
I.L- No
No
NO APPROY AL: The Public Works Department has reviewed this request and does not give
its approval for the reasons stated:
Signature
Michael Garcia
Date
Stipulations attached: _ Yes
~No
Summary Comments: ,4.v'/ l1"f,,"~E 70 THE ex,s""''' j>"JSVG ''''~ov''''''a..,rs As A
/lGsvt..r" 01= r#/J Co""sr"tlt..#~""~o"/ IS Tg &E KtE:.-rPIfl..E;"p 13Ke:,1-ft:- &~,... '+/*'~..n..,4lvr
TO C-.lo- $~p~~ ?A!.I"1.. Tz:::; C.O. /j$(.h4L'llce. IIV,46e '-SR.r,t=lt6dr,<=lN
L.E:~ ,S /l.Etp(,JIIEo /7e1C1~ TC:; c.o. J$$V14Nc..e.
File~: on Enginent\Fonns\Bldprmt3.fnn
Rev 05/00
PUBLIC WORKS REVIEW FEE STRUCTURE FOR BUILDING PERMIT APPLICATIONS
Date "j. Ie. . 0 "2-.
Applicant
Phone #
Location of Construction
Purpose of Construction ~
Single Family _ Commercial
Building Permit Value
Multi-Family ~
DEVELOPMENT REVIEW FEES
D<!velopment Review Processing Fee: ~
(fell' document processing)
$/0'0'.,,0
Single Family Residential Review Fee: $50.00
(fN review of applicable technical documents)
$
C',mmerclal/Muiti-Famlly Review Fee: ~- -
For review of e~isting technical documen 00.0
. For review of technical documents for con . n in
right~of-way, final drainage report and erosion control plan $500.00
$/f)(').OD
Subdivision Improvement Agreement Fee: $125.00
(felr document processing and recording)
$
$
D<!velopment Covenant Fee: $125.00
(for document processing and recording)
$
CIJOT Access Permit Fee: $100.00
(for document application and processing)
Traffic Impact Study Review Fee: $100.00
(for document review and processing)
$
$
Flood Plain Variance Review Fee:
(for document review and processing)
Class I application = $150.00
$
Class I Publication/Public Notice = N/A .
Class II Publication/Public Notice = $90.00
$
$
Class" application = $250.00
TOTAL REVIEW FEES: (due at time of building permit issuance)
$ 2-00. D/">
Pl.EASE NOTE THAT IN ADDITiON TO THE ABOVE FEES, THERE Will BE ADDITIONAL LICENSING AND PERMITTING
FE:ES REQUIRED FOR CONSTRUCTION OF IMPROVEMENTS WITHIN PUBLIC RIGHT-OF.WAY.
Signature of Applicant
~c
~
Date
9, /7.0<::.
Files on Enginent/Forms/Review Fees.Building Permit Ap
Rev 04/01