Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
3480 Ames Street
i CITY OF WHEAT RIDGE 1 Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: LIC) - Acy-- Job Address: :3: Permit Number: `%cam �a •j X PINK( ❑ No one available for inspection: Time'AMPM -2 Re -Inspection required: Yes When corrections have been made, schedule for re -inspection online at: http✓/www.ci.wheatridge.co.us4nspection 1/ Date: �.c��.� �� •�•�Inspector: �� s_�a- s_ CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: qo - Job Address: 3L/70'. m ST Permit Number: Zozo Q 1 -7 (.,5 ❑ No one available for inspection: Time Re -Inspection required:Ye No When corrections have been made, schedule for re -inspection http✓/www.ci.wheatridge.co.usrnspection -1011% Date:10 • V_ ZD Inspector: M at: i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office _:�9r INSPECTION NOTICE Inspection Type: S V Job Address: Permit Number: i_&1r- %Z _11� 5 __1 vca . a S /vc ❑ No one available for inspection: Timet%` Re -Inspection required: Yes 46N When corrections have been made, schedule for re -inspection online at: http✓/www. ci. wheatridge. co, usrinspection Date: —V spector:.S;; DO NOT REMOVE THIS NOTICE If i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: 3DG ` i" I D Job Address: L4 /6 ym c � 7— Permit Number: 2-0 zo 0 j --?"') (n ❑ No one available for inspection: Time QPM Re -Inspection required: Yes No When corrections have been made, schedule for re -inspection onlinfat: http✓/www.ci.wheatridge.co.us4nspection le) _ Date: ZOZLD Inspector: $ 2,0001 `? -)� 9-28-2020 To whom it may concern, 3�ISQ Arn6-5 sT This letter is to confirm that the workmanship and installation warranty for the property located at 3480 Ames St Wheat Ridge, Co. 80212 will have a 10 -year workmanship warranty and GAF shingle manufacturer's warranty will be in full force per GAF Rich Smith. Stephen Simpkin CEO of All -Around Roofing and Exteriors Inc inspected the substrate and noted the 1x8 plank decking prior to the installation of the GAF Class IV Armor Shield shingle. Based on my experience as a Master Elite contractor for over a decade and as a Certified HAAG residential roofing inspector, I paid close attention during the build and took pictures of the belly of the roof. The substrate is in good condition. I reached out to GAF's Rich Smith in the past regarding what they will approve and what they will not approve when it comes to roofing over 1x8 planks. The decking at 3480 Ames St is good condition and it would not need to be re - decked. I contacted Rich Smith the National Chief roofing and warranty inspector for GAF and he did approve the installation that All Around Roofing and Exteriors Inc did at 3480 Ames St. GAF has approved the installation of the Armor Shield class IV shingle and all shingle manufacturer warranties will be in full force. All Around Roofing and Exteriors Inc will apply a 10 -year workmanship warranty which will be applied to the roofing project. The roofing project at 3480 Ames St has all necessary warranties, workmanship and shingle manufactures. IF you have any questions please call me directly, Stephen Simpkin 720-436-3547 CEO All Around Roofing and Exteriors Inc GAF Master Elite contractor Licensed and certified HAAG residential roofing inspector # 2011022169 Adjuster All- lines 4-2bzoo 1 -2 -)6 3q90 A/�U� s'T We protect what matters September 21, 2020 most` Project: Montessori School, 3480 Ames Ave Wheatridge, CO 80221 To Whom It May Concern: Jonathan Almonte Technical Support Services 1 Campus Drive Parsippany, NJ 07054 Phone: 1-800-766-3411 It is our understanding that you have recently installed a GAF Timberline° HDZ shingle at the above -referenced project. You are inquiring about the home's 1x8 wood plank deck and how it will affect your GAF manufacturing warranty. This is to confirm that the Shingle and Accessories Limited Warranty will remain in full force and effect per its terms and conditions. Please see the GAF technical bulletin (TAB -R -2011-101-R1): Please note that the GAF Shingle and Accessory Limited Warranty covers manufacturing defects of the shingles and does not cover workmanship for the installation or repairs. Any problems caused by any application that is not in strict accordance with the application instructions are the responsibility of the applicator and would be excluded from GAF responsibility under the terms and conditions of our Shingle and Accessory Limited Warranty. If you have any further questions, please contact us at 800-766-3411. Warm Regards, aonam w a&.on& Jonathan Almonte Technical Support Services Representative 1 Campus Drive, Parsippany, NJ 07054 1 973.628.3000 1 Toll Free 877.423.7663 1 gaf.com i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: Job Address: Permit Number: ❑ No one available for inspection: Time AM/PM Re -Inspection required: Yes No When corrections have been made, schedule for re -inspection online at. http✓/www.ci. wheatridge.co. ushnspection Date: Inspector: DO NOT REMOVE THIS NOTICE A i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: Job Address: Permit Number: .-,l LJ No one available for inspection: Time iwpm Re -Inspection required: Yes No When corrections have been made, schedule for re -inspection online at: http:lAvww.ci.wheatridge.co. uslinspection Date:— Inspector: DO NOT REMOVE THIS NOTICE A i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type:�`�` Job Address: -��r`a��'r.%• Permit Number: ?�:s�� ❑ No one available for inspection: Time AM/PM Re -Inspection required: Yes (No; When corrections have been made, schedule for re -inspection online at: http://www.ci. wheatridge. co. ushnspection Date: Inspector: =r`•-r2� ®O NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: Job Address: Permit Number: r; r ❑ No one available for inspection: Time � ' AM/PM Re -Inspection required: Yes 1M When corrections have been made, schedule for re -inspection online at: httpJ/www.ci. wheatridge.co. ualinspection Date: "L - ''r Inspector: DO NOT REMOVE THIS NOTICE A i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: Job Address: Permit Number: L) No one available for inspection: Time UIPM Re -Inspection required: Yes No When corrections have been made, schedule for re -inspection online at: http:lAvww.ci.wheatridge.co. urns pection Date: Inspector: DO NOT REMOVE THIS NOTICE A i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type:` 'o Job Address: Permit Number: -7 ❑ No one available for inspection: Time Ir. ?) AM/PM Re -Inspection required: Yes 03 When corrections have been made, schedule for re -inspection online at: http✓/www.ci, wheatridge.co, uslinspection Date: Inspector: DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: `s ? /LL` Job Address: fIy,?i �> Permit Number: ? J C ❑ No one available for inspection: Time Re -Inspection required: Yes "No When corrections have been made, schedule for re -inspection online at: h ttpYlwww. ci. wheatridge. co. uslinspection Date: �.r s �' Inspector: DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: �Y r5 • .� Job Address: �'�� /,r�?s = -J Permit Number: Z G?c,,� 0i 7 / �f�,�. ��'�, ���n �L•VtGLe� fi'�%� r�%^� /y'�� Grp �� ❑ No one available for inspection: Time AM/PM Re -Inspection required: Yes ;No When corrections have been made, schedule for re -inspection online at: http://www.ci. wheatridge.co. uslnspection Date: 4,` Inspector: r DO NOT REMOVE THIS NOTICE Permit Number 202000130 September 9, 2020 City of Wheat Ridge — Community Development Building Inspection Services 7500 West 29,^ Avenue, 2- Floor Wheat Ridge, Colorado 80033 RE: Primary Accessible Route 3480 Ames Street Wheat Ridge, Colorado Attn: Mr. Randy Slusser, CBO ®kt® ®�City of ®J coy, W he at MVILOPMEN` d e APPROVED Reviewed for Code Co rr>Dlianse Randy Slusser 9/09/2020 Plans Examiner Date VilWity of oertnH: rtrt;ssuarau of o pevmW w aPiorord of plans speci/lootWtM and computations shoN not be o permd /or or on approrat o f " aolabon to any of the provisions of the buldmg cove or of aw MY ord na oces. permits presuming to ghs authority to Wololt of otncel the provisions of th! OuAWV cods or othrr orconaoort a/ the City shoo not be rood This letter is to confirm my position, as discussed with you last week, that the Building Department requirement for installation a single rail along one side of the sloped surface approach to the main entrance of the subject project is not required by the Building Code. The railing, as proposed by the Department does not meet the design requirements of the Building Code for handrails or guards and the installation proposed places me, as the Architect of Record in an indefensible position from a professional liability standpoint. It is my understanding the rail is being required under the provisions of 2012 IBC Section 1003.5: 1003.5: Elevation Change: Where changes in elevation of less than 12 " exist in the means of egress, sloped surfaces shall be used. Where the slope is greater that one unit vertical in 20 units horizontal (5% slope), ramps complying with Section 1010 shall be used. Where the difference in elevation is 6" or less, the ramp shall be equipped with either handrails or floor finish materials that contrast with adjacent floor finish materials. Section 1003.5 does not apply to either the design of or the as -built conditions of the sloped surface in question. • The total change in elevation of the sloped surface is greater than 12 inches • The running slope of the sloped surface is less than 5% • Per IBC Section 202, a Ramp is "a walking surface that has a running slope steeper than one unit vertical in 20 units horizontal (5% slope); the definition is similarly worded in both ANSI 117.1 and the ADAAG. The walking surface in question is not a ramp and the Code requirements for handrails and/or edge protection in Chapter 10 do not apply. • At no point along the walking surface in question or at the existing main entry surface does the vertical change in elevation come close to approaching 30" — the requirement for guards under Chapter 10 also does not apply. Section 1003.5 means that where a change of elevation of less than 12" occurs in a means of egress pathway, you cannot use a stair — it does not mean you must use a ramp nor does it stipulate that a sloped surface with a running slope of less than 5% and a rise of more than 12" is to be treated as a ramp with the installation of handrails. While there are 3 exceptions to 1003.5, none of the exceptions apply to this project or to this location. 62-2131 The RTO Group, Ltd. ♦ Architects 200 Quebec Street, Building 600. Smite 201 Denver, Colorado 80211 P 303-964-8282 F 303-964-8383 September 9, 2020 Page 2 of 3 As explained to me by the General Contractor, the Department's requirement is to install a single rail or guard on only one side of the walking surface extending from the top of the surface down approximately 13 feet — not the full length of the surface. Nothing about such an installation has any basis in the Code and to do so is catamount to admitting there is a foreseeable hazard. • If an incident occurs at the bottom portion that is not provided with a rail, the question will be raised that if there was a perceived foreseeable hazard at the upper portion of the walking surface, why was the lower portion not similarly protected? • Likewise, if an incident occurs on the opposite side of the walking surface, a similar question will be raised — if there was a foreseeable hazard on one side, why were both sides not equipped with a rail? • There are two other locations on the site where sloped walking surfaces with a running slope of less than 5% were used; neither is under the same scrutiny as this location. If an incident occurs at either of these locations, the logical extrapolation is, if a foreseeable hazard was perceived at the front of the building why were neither of the other locations equipped with a similar rail? I have reviewed the design and as -built conditions along with the details of the Department's requirement with the risk manager from my E & O Insurance Company. She agrees, installing a rail in any form places me in an indefensible position, especially in consideration of the fact that the rail, either a handrail or guard does not comply with the minimum requirements of the Code in the form requested by the Department. I am not willing to accept being placed in an indefensible position nor the liability that comes with it. As you know, the General Contractor reached out to ICC for an interpretation as to whether Section 1003.5 applied to this location, the answer to which was no. You have also contacted ICC over concern about the wording of the Contractor's question contained in the reply. For your reference, I have attached a copy of the actual question as posed to ICC by the Contractor that is a bit different than the paraphrased recapitulation contained in the reply from ICC. On the basis that the sloped walking surface as designed and constructed is in compliance with the requirements of the Building Code, that the rail requested is not in compliance with the Code, that ICC indicates that Section 1003.5 does not apply to this situation and the indefensible position installing a rail places me in, I respectfully request that you rescind the requirement for the rail. Sincerely: Richard E. Teves, Architect The RTO Group, Ltd. ♦ Architects r 62-2131 August 27, 2020 Richard E. Teves, Architect The RTO Group, Ltd. 200 Quebec Street, Building 600, Suite 201 Denver, CO 80230 Re: Midtown Montessori Academy Fire Damper Installation Dear Rich, This letter is to address the fire damper installation. The 2012 International Mechanical Code Section 607.2 states: Section 607.2 — Installation Fire dampers, smoke dampers, combination fire/smoke dampers and ceiling radiation dampers located within air distribution and smoke control systems shall be installed in accordance with the requirements of this section, and the manufacturer's installation instructions and listing. Based on field observation, review of construction photos and conversations with the contractor, the fire damper appears to be installed in accordance with the requirements of the mechanical code. Sincerely, `O`O*EL�q• e� Michael Best, PE RTM Engineering Consultants ,aM�d�n Michael Best, PE RTM Engineering Consultants 1 3000 Youngfield Street, Suite 105 1 Wheat Ridge, CO 80215 rtmassociates.com 1 303.297.1038 1 MBE Certified Business 4 G(/ /30 k1r, t M August 28, 2020 Richard E. Teves, Architect The RTO Group, Ltd. 200 Quebec Street, Building 600, Suite 201 Denver, CO 80230 Re: Midtown Montessori Academy Ventilation Dear Rich, This letter is to address the ventilation requirements. The 2012 International Mechanical Code Section 401.3 states: Section 401.3 — When Required Ventilation shall be provided during the periods that the room or space is occupied. The thermostats for the HVAC systems shall be set so that the supply fan runs continuously whenever the building is occupied ("Fan — ON" position). When the building is unoccupied, the fan may be set in the AUTO position. Sincerely, :��00 r2" Michael Best, PE RTM Engineering Consultants Michael Best, Digitally signed by Michael Best, PE PE Date: 2020.08281022:56 -06'00' RTM Engineering Consultants 1 3000 Youngfield Street, Suite 105 1 Wheat Ridge, CO 80215 rtmassociates.com 1 303.297.1038 1 MBE Certified Business i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: 2 L,,vk +1L,t t ;V,, T Job Address: Permit Number: -z r_nz[` ';o , -;r, t ❑ No one available for inspection: Time AM/PM Re -Inspection required: Yes ' No ; When corrections have been made, schedule for re -inspection online at: http✓/www. ci, wheatridge.co.uslinspection Date: 'r I`- 1,t? ; � ► 44" City of Wheat Ridge '/� Commercial Roofing PERMIT - 202001776 PERMIT NO: 202001776 ISSUED: 09/03/2020 JOB ADDRESS: 3480 Ames St EXPIRES: 09/03/2021 JOB DESCRIPTION: Reroof with GAF armorshield 2 dimensional asphalt shingles, 5/12 pitch, 129 squares total *** CONTACTS *** OWNER (918)600-9570 WAKON REDCORN SUB (303)421-7663 STEPHEN W. SIMPKIN 120242 ALL AROUND ROOFING & EXTERIORS *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 501 / BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 33,153.00 FEES Total Valuation 0.00 Use Tax 696.21 Permit Fee 545.55 ** TOTAL ** 11241.76 *** COMMENTS *** *** CONDITIONS *** COMMERCIAL FLAT ROOFS: In order to pass a final inspection on commercial elastomeric or similar type roofing, a WARRANTY LETTER from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. LADDER MUST BE SET FOR ALL ROOF INSPECTIONS: A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. ALL PITCHED ROOFS REQUIRE A MIDROOF INSPECTION REGARDLESS OF PITCH. MIDROOF & SHEATHING: Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and Mid -roof inspections may be called in at the same time, 100 percent of the sheathing must be complete and 25-75 percent of the midroof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. REGARDING ROOF VENTILATION: Roof ventilation shall comply with Building Division Policy BD -18-001 for Balanced Ventilation Systems, or manufacturer installation instructions, whichever is more stringent. FOR ROOF PITCH 6/12 AND OVER: Midroof & Final Roof inspections for ROOFS with 6/12 PITCH & OVER: 3rd party inspection will be required for both the midroof and final inspections. The 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. 44" City of Wheat Ridge _A� Commercial Roofing PERMIT - 202001776 PERMIT NO: 202001776 ISSUED: 09/03/2020 JOB ADDRESS: 3480 Ames St EXPIRES: 09/03/2021 JOB DESCRIPTION: Reroof with GAF armorshield 2 dimensional asphalt shingles, 5/12 pitch, 129 squares total I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am leg ally authorized to include alI entities named within this document as parties to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date 1, This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This.permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180, days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and��procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all requ�ired inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, anviolation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. From: no-reolv(alci.wheatridae.m. us To: CommDev Perm is Subject: Online Form Submittal: Roofing Permit Application Date: Thursday, September 3, 2020 2:44:46 PM Roofing Permit Application THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this property Commercial Commercial or Residential? PROPERTY INFORMATION Property Address 3480 Ames Street Property Owner Name wakon redcorn Property Owner Phone (918) 600-9570 Number (enter WITH dashes, eg 303-123- 4567) Property Owner Email wredcorn@sbcglobal.net Address Do you have a signed Yes contract to reroof this property? CONTRACTOR INFORMATION Contractor Business all around roofing Name Contractor's License 120242 Number Contractor Phone 715-531-3655 Number (enter WITH dashes, eg 303-123- 4567) Contractor Email csoukup@acre-co.com Address Retype Contractor csoukup@acre-co.com Email Address Attach City of Wheat wheat ridge electronic payment form ndf Ridge Electronic Payment Form - "DO NOT ATTACH A PICTURE OF A CREDIT CARD" DESCRIPTION OF WORK TOTAL SQUARES of 129 the entire scope of wo rk: Project Value (contract 32,250 value or cost of ALL materials and labor) Are you re -decking the No roof? Is the permit for a flat Pitched roof (2:12 pitch or greater) roof, pitched roof, or both? (check all that apply) What is the specific 5/12 pitch of the PITCHED roof? How many squares are 129 part of the PITCHED roof? Describe the roofing GAF armourshield 2 dimensional shingles materials for the PITCHED roof: Type of material for the Asphalt PITCHED roof: Provide any additional remove existing shingles to decking and replace with GAF detail here on the armourshield 2 shingles description of work. (Is this for a house or garage? Etc) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have Yes been authorized by the legal owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Person Applying for chrissoukup Permit Email not displaying correctly? View it in your browser. Inspection Type: Job Address: Permit Number: CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE ❑ No one available for inspection: Time AIIM Re -Inspection required:;/Yes No When corrections have been made, schedule for re -inspection online at. http;Yfwww. ci. wheatridge. co. uslinspection Date: Inspector: DO NOT REMOVE THIS NOTICE �1A4: •yl� s ❑ No one available for inspection: Time AIIM Re -Inspection required:;/Yes No When corrections have been made, schedule for re -inspection online at. http;Yfwww. ci. wheatridge. co. uslinspection Date: Inspector: DO NOT REMOVE THIS NOTICE O m CD $ _0 CD 0 7 d CLJ %q 0 �n I 0 o � _ \§ CD CD \ E 5 $ J k7 cr 9 § 2 CD § 7 C 0 2 %.J � \� �A 0 2 7 D / k � 2 � k v \ �2� \ [ Z @ N 0m _7 � 0 �k Z � ` ¥ C § � @ � \ [ Z 0 Cl)� _7 � -1 o m C) � 0 ■ o �2 Z \g z rn 0 k p c � k Q � 0 < p 0 m (D cn (D C7 O n -r -M L) L-0 s n �I® Z o z s Q > oCL _n. CD o f, n n 0 o < _N (DD OD n m o lb rt cr N 0 CD C� Q O m o M, a (b ch yCq V (D ®� z cO OCD y C) C) e 0 0 Q D 3 L-0 s n �I® z s Q > oCL _n. (D CD U VJ (D h-♦ V/. Cl)a =. W Q _n. 0 f, n CA) (o 0 _N (DD OD n m rt ® 0 m o M, m s_ CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office �.r INSPECTION NOTICE_ - k Inspection Type: 'L Job Address: Permit Number: ZL -;?. r.: ❑ No one available for inspection: Time /6-., AM/PM Re -Inspection required:(yes s No When corrections have been made, schedule for re -inspection online at: http://www, ci. wheatridge. co. uslinspection Date: 'i- - ! VU Inspector: " !%1 DO NOT REMOVE THIS NOTICE sl+a�'+,1%c: dp �'.�_"t i.'._a: A, a•Y . / ti -:.a: ",.t ."+F / aS "` Fa. n , � f..'.C-;t" .G '''t' !�'..;�.�� 6`•-3-� G.'+ "'IIe rS — C.c.s �.":� a` �p%rail,•/'-� /•.;.- •�''..- - ;.a:,S-�<^.d- 6^! 7"c..d ,r.:�.. �L:s'7s._ t4 /� `' ✓.•• art -' : Es ,f. I d .i'"d.. i •` ..:' ) . '. /�.'�.�s' ❑ No one available for inspection: Time /6-., AM/PM Re -Inspection required:(yes s No When corrections have been made, schedule for re -inspection online at: http://www, ci. wheatridge. co. uslinspection Date: 'i- - ! VU Inspector: " !%1 DO NOT REMOVE THIS NOTICE (D cn (D C7 O n -r -M L) L-0 s n �I® Z o z s Q > oCL _n. CD o f, n n 0 o < _N (DD OD n m o lb rt cr N 0 CD C� Q O m o M, a (b ch yCq V (D ®� z cO OCD y C) C) e 0 0 Q D 3 L-0 s n �I® z s Q > oCL _n. (D CD U VJ (D h-♦ V/. Cl)a =. W Q _n. 0 f, n CA) (o 0 _N (DD OD n m rt ® 0 m o M, m i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: Job Address: Permit Number: ❑ No one available for inspection: TimeM/PM Re -Inspection required: s/Y No When corrections have been made, schedule for re -inspection online at: hUpJ/www.ci.wheatridge.co.usrnspect*, -- 'a N Z CDO o 'D CD 0 1 n CD CD ,0.� Z C D Q O 1 CD Z y C CD CD CD O c R- U) U) a CD CD CD C7 cD n 0 q � Z 0 O O 3 m o CD n -Cn � a O N CD 0 Z o m D , 0 O On N L O 'D CD 1 ty ,0.� Z C D Q O 1 Z y N CD Z W n m c� n -Cn � O N CD Z � = m O On -4 k M n CD C) mo' m i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: "F: - Job Address: !ZU ERM Permit Number: 7 ❑ No one available for inspection: Time AM/PM Re -Inspection required No When corrections have been made, scheafjile for re -inspection online at: hUp://www.ci.wheatridge.co.usrnspectioli j �! 41 CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office i INSPECTION NOTICE E Inspection Type: Job Address: Permit Number: ❑ No one available for inspection: Tim - /PM i--_, Re -Inspection required: Yes KNo When corrections have been made, sche u for re -inspection onl Mat: httpYwww.ci.wheatridge.co.uslinspection "~ �M� CD s L N � CDO •moi ® �. 0 Z ® � ch n 0 O fD�`� m �' rn _ O— (D � Q O C O 3 01 —C CD 70 O CD y z 0 O O O �D a 3 D ep � '0 3 O 3 a n®. CD cr N � WCL, •moi ® �. 0 Z 0 _ co CD Z ch O 00 -i fD�`� m �' rn CD $ 1® z z W n o a-1 ® lu o -< n 0 0 CD 0 Q o' Nm 2 z M 2) O o� -k Q �o 07 CD o Q O -a m -. CD lb CDn o �n o o E 3 o m 1® z W n N a-1 lu o -< m �� 0 W� o, N Z Nm 2 z tn o D O o� -k n °y'� m �• m CD N L$ O O C7 C 0 C CL CD Cr N'0 erg M CD z CD z W O N 10 ® O 03 n n CD O .n N � -1 s® ® < N CD = z co 0m zr CD ® tp CD (D n o CD Qcn O -� _0 CD y CD N CDCD � o n y z o' o = 3. CD �T V �•F CD N L$ O O C7 C 0 C CL CD Cr N'0 erg M z W 0 N 10 wa 03 m �� O 0 N � -1 ) O N CD = z co 0m z cn O 0® ® n (D J/ 7 R %§ Z o k §\ ` ¥ C iq �D CD ! \ E 5 ƒ k7 (D � \ G = CD § 7 (D 0 PE cf)(f)\ § 0 ca 0. ƒ.0 / 0 0 e» 2 ~ \ . �to � 0 . ■ cr % / \ o . 7 0 z D�� 2 . -h Q R - o < ® p . \ � s « � \ �Z Z CL ` ¥ C C ! § ■ CD PE CS � ... / 0 \ \ �to � ■ cr % «. \ o . \Ul 0 z D�� -h Q - o < ® p . i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: Job Address: Permit Number: ❑ No one available for inspection: Time AM/PM Re -Inspection required: Yes No When corrections have been made, schedule for re -inspection online at: http://www. ci. wheatridge. co. uslinspection Date: - Inspector:' .. DO NOT REMOVE THIS NOTICE -3 2Dz0 Or7 a )i. Cellulose insulation installed as ttstrd for the �jsc cific awication. July 24. 2020 Mr. Gknn Massatouti Tum Key General Comtractws 6970 Sorth Broadway, Suite K Denver. Colorado 90221 RE: Midtown Montessori Academy - Skian's Lek. 3490 Ames Street What Ridge, Colorado With regard to —.1 questions in the field from the City of Wheat Ridge: 1. Th attic ma(s) cannot exceed 3,000 SF The attic of this building is contpeMtentalixed into five (5) compartments with draft stop partitions or building exterior walls. These an: also two (2) areas under roof dial do not have attic space. All compartments and individual undivided arras are less than 3DOO SF in si=t. Tb— arc two (2) locations in ooe draft stop partition wb= a hole of approxinumely 4%0- x 4'-0" was cut by others over the life of the building. Music openings are to be patched in accwd with mnteriuls approved under Section 71$ 2.1 of the 2012 IBC. Dmwsng AOOSA is au.a heed to this letter shouing the attic compartments. draft stop patitirm locations. approxinmtc location of the holes to be patched and listing materials approved under Section 719.2.1. 2. Fire blocking is required between moi miters at the south wa11 of Ycsuibuk 129 to prism,: the 2 -hour fire rating of the wall As resohxd with the City during plan review, per 2012 IBC Sections 707.4 & 705 and the IBC Cmmnentary• on the application of Section 705. the requirement for 24— all construction stops at the line of the low roof on the opposite side of the Booth wall of the vestibule; the wall from that point up is considered to be an exterior wall. not a fire barrier and at ibis location. rating of the exterior wall is not required. Sincerely' For Tlm RTO Group, Ltd.: Richard E. Teves. Architect The RTO G.,vp. Ltd. • :\.. hu.i i. • �,:�..,.:, x.�::. s�aao, H.. ,,w. _u,i ro:.,..c,.u..�x._.., r �•w.. s_s_ r w ....,. CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: ..Address:► Permit Number: ❑ No one available for inspection: Tir Re -Inspection required: Yes N When corrections have been made, schedule http:/�/www.ci.wheatridge.co.ushnspec�►on j Date: p7ector AM/PM for re -inspection online at. CD 0 0 :3. * -T L (CDZ s o b C— 'D o o m lI� n o {^ n Z Q ° `� 3 CL 1 W m �' -0 �. � c aZ) -N Lo M c cD t3. Q 0 �' Z W 0 c ° cn "c� C (DCD (n 0 0 w� m °ao O ® iv C 2 cn M D z i ® CD 0 M m o m o° D o i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: 17 Job Address: Permit Number: _S, ❑ No one available for inspection: Time `/3M/'M Re -Inspection required: Yes No When corrections have been made, schedule for re -inspection online at: http://Www.ci.wheatridge.co.uslinspection Date: - u= Inspector: DO NOT REMOVE THIS NOTICE CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: Job Address: -3 Y'Ej 0 Permit Number: 74- Cep J No one available for inspection: Time AM/PM Re -Inspection required: Yes No When corrections have been made, schedule for re -inspection online at: http;llwww. ci. wheatridge.co. uslinspection Date:— '7-- �/- %` Inspector: DO NOT REMOVE THIS NOTICE -CITY OF WHEAT RIDGE, Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: Job Address: 344_�U Permit Number: -zc:zc, Cam� Ll No one available for inspection: Time AWIPM Re -inspection required/Yes No When corrections have been made, schedule for re -inspection online at: http;llwww. ci, wheatridge. co. usrinspection Date:- 7 - �6' Inspector: DO NOT REMOVE THIS NOTICE � 14 Ll No one available for inspection: Time AWIPM Re -inspection required/Yes No When corrections have been made, schedule for re -inspection online at: http;llwww. ci, wheatridge. co. usrinspection Date:- 7 - �6' Inspector: DO NOT REMOVE THIS NOTICE lv"4' ''CITY OF WHEAT klbG'E _A Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: 7! 1 Job Address: Permit Number: < U No one available for inspection: Time (AI1A M Re -Inspection required: iYes �1No When corrections have been made, schedule for re -inspection online at: hftpL1A,vww.ci. wheatridge.co.ueinspection D -7,A Date: Inspector:"- 1"��, DO nspector- DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: 3/7 Job Address:`�Ur Permit Number: 2("eo G'G / 36-, ❑ No one available for inspection: Time / ��`,wom Re -Inspection required: Yes No When corrections have been made, schedule for re -inspection online at: http://www.ci. wheatridge.co. uslinspection Date: '% - '7,_. -F` Inspector DO NOT REMOVE THIS NOTICE CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: Job Address: 39160 Permit Number: LJ No one available for inspection: Time PX-� Re -inspection required: (!es) No When corrections have been made, schedule for re -inspection online at: httpYlwww. ci. wheatridge. co. uslinspection Date:- 7- -"- -inspector: DO NOT REMOVE THIS NOTICE A 4, ` CITY OF WHEAT RIDGE' ` Building Inspection Division r4000'r (303) 235-2855 Office INSPECTION NOTICE Inspection Type: Job Address:`�`��' Permit Number: < J.No one available for inspection: Time Re -Inspection required: Yes No When corrections have been made, schedule for re -inspection online at: http✓/www.ci. wheatridge.co. usrinspection Date: 7-K- F6; Inspector: iC-,�� DO NOT REMOVE THIS NOTICE Permit # 202000130 June 30, 2020 Mr. Glenn Massarotti Turn Key General Contractors 6870 North Broadway, Suite K Denver, Colorado 80221 RE: Midtown Montessori Academy — Sloan's Lake 3480 Ames Street Wheat Ridge, Colorado With regard to recent questions concerning deflection track at the top of new full height interior partitions: The roof of this building was constructed with conventionally framed dimensional lumber generally consisting of 2 x 10 roof rafters and ceiling joists. In this type of construction the rafters are fastened (nailed) to the top plate of the exterior bearing walls to transfer the horizontal thrust generated by rafter deflection into the exterior wall. Ceiling joists, typically installed parallel to the rafters, are also fastened to the top plate and the ends of the rafters. This creates a tie across the building to withstand the outward lateral forces of the rafters placing the joists in tension. Deflection of the rafters is not transferred to the ceiling joists. Typically, interior partitions extending to the underside of the ceiling joists are fastened to the bottom of the joists, especially where joists are joined or spliced above the partitions. Existing full height partitions observed in the building, either those that remain or those that have been removed for this project, are framed with 2 x 4 or 2 x 6 studs and do not include any deflection or slip joint detail. We have observed no evidence of partition cracking, or floor slab deformation in the main floor area, lower level/basement or in the pipe tunnels extending throughout the building. Given the age of the building, observed conditions and method of roof framing (independent rafters and joists, not a truss system), rafter deflection under snow or lateral loading is not transferred to the ceiling joists and the use of deflection track at new full height metal stud partitions is not required. Sincerely: For The RTO Group, Ltd.: Richard E. Teves, Architect 62-2131s 200 Quebec Street, Building 600, Suite 201 1. 1,' City of ComMW heat . ,_I,ge APPROVED Reviewed for Code Comalianee Randy Slusser 7/01/2020 Plans Examiner ®ate ye#ldhv of pesmh: The issuaou of o permit at gpprovW of plans specocoMns ondcompurahons shall not be o permstlof, or on approvd of, any vmotobon to any of me provisions of the building code or of oM City orQmrances. Permits Presuming to ghrr ouharrty to Wolotr or com el the pravwans of the iu" cotes or other ordinptiM of the City shall not be eaNd. The RTO Group, Ltd. ♦ Architects Denver, Colorado 80230 P 303-964-8282 F 303-964-8383 i CITY OF WHEAT RIDGE Building Inspection Division r0000or (303) 235-2855 Office INSPECTION NOTICE Inspection Type: / j Job Address: Permit Number: v F ❑ No one available for inspection: Time IAU, 7PM Re -Inspection required: Yes No When corrections have been made, schedule for re -inspection online at: http✓/www.ci. wheatridge.co. uslinspection Date: i' ` Inspector: /C',. DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type:05�L�k Job Address: `= c) Permit Number: - � ❑ No one available for inspection: Time iA/PM Re -Inspection required: Ye �. No When corrections have been made ebedul inspection online at: http✓/www.ci.wheatridge.co.ueinspeztio i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: 34 Job Address: 75': 'S& Permit Number: 1.30 •/'�.C-�...� % y ''�1.-,,� �ZL- G:`�'°'?� Cn^. ":a'? may'.. r , ❑ No one available for inspection: Time J40_4 %PM . Re -Inspection required: Yes No When corrections have been made, schedule for re -inspection online at: httpYlwww. ci. wheatridge. co. uslinspection rf Date: -� � � � �.: Inspector: DO NOT REMOVE THIS NOTICE e i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type:"] Job Address:��-'' Permit Number: :Zozc,� ❑ No one available for inspection: Time' AM/PM Re -Inspection required: Yes No `.. When corrections have been made, schedule for re -inspection online at: http.-IAvww.ci.wheatridge.co.usVinspection Date: C - Inspector: %� DO NOT REMOVE THIS NOTICE Inspection Type: Job Address: Permit Number: CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE AVT U No one available for inspection: Time f !AMM Re -Inspection required: Yes No When corrections have been made, schedule for re -inspection online at: http.-Ilwww. cL wheatridge. co. usVinspection Date:- ?6,) Inspector: DO NOT REMOVE THIS NOTICE CITY OF WHEAT RIDGE' Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: .. 6"1 "21" Job Address: 1711; �' Permit Number: cc•�o .���.�''> _ �-IJ.:' ��`� :� �'1 � ter.= • - - �.. „'�':, � ./� • !../f jam' S i .tea' �e '�Gl �"' �,1 ❑ No one available for inspection: Time -1,""r red AM/PM) Re -Inspection required: Yes No When corrections have been made, schedule for re -inspection online at: http✓/www.ci, wheatridge.co, uslinspection Date:—"-'-) � ° Inspector: _ -,�? DO NOT REMOVE THIS NOTICE From: no-reolv(alci.wheatridae.m. us To: CommDev Pets Subject: Online Form Submittal: Revision to Permit Application Date: Friday, June 12, 2020 11:59:24 AM Revision to Permit Application Permit Number 202000130 assigned to project PROPERTY INFORMATION Permit Number 202000130 Property Address 3480 Ames St. Property Owner Name Rebecca Barrilleaux Property Owner Phone 214-517-5059 Number (enter WITH dashes, eg 303-123- 4567) Property Owner Email rebecca@mymidtownmontessori.com Address CONTRACTOR INFORMATION Contact Name Glenn Massarotti Contact Phone Number 303-467-9667 (enter WITH dashes, eg 303-123-4567) Contact Email Address glennm@turnkeygc.com Retype Contact Email glennm@turnkeygc.com Address DESCRIPTION OF WORK Detailed Revised Minor modifications to address building issued uncovered during Scope of Work - construction Provide a detailed description of work including mechanical, electrical, plumbing work occurring, adding/removing walls, etc Engineer Letter (if Field not completed. applicable) Additional Documents on Letter Size Are plans or documents locked for editing? Construction Plans scanned on 11'x17" or larger Additional Project Value Only add what the revised scope of work is valued at. Field not completed. No $o SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have Yes been authorized by the legal owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Person Submitting Glenn Massarotti Revision Email not displaying correctly? View it in your browser. « )FIRE HYDRANT o00a4 r5 CORNER 35TH 65HERIDAN BLVD P R1-1 TRAFFIC 516N LEGEND LNN WALL METAL GUARD RAIL ft TANN6 WALL 5TAPP PRE5GHOOL 1 5 S) 6W WALL 1 1 ELEMENTARY (E) ADJ PROPERTY III GENERAL OVAIEft. 5PKLMTED LLA 1.1 O STUDENTS 200 LIPAN 5TREET S5 Sy PRESCHOOL _. d1----- 4k DENVER LO &0203 C^ y I I P05T MTD ONE WAY' O N(F6-1)EA SIDE LF W I 5T 3 B AREA 2 39'-33,r 11 ]493 OF N)ALLE55BLE (E) ADJ PROPERTY 45% �(E) A5PI ALT PAVEMENT /S)60N6 PAD I_(E)LONLRETE WALK ' N) POST MTD NO PARMT ANY TIME "ASN(ftl-1) I 'II N) 4 FT HIGH ARAN LNK F- - WDER I S I E(PO6OATEII z BLACK OR 6ftEEN) I a o I F `n O � a I I(E)LANDSLAPE BED N) 36ALPER DEOD)OUs / TREE-TYP OF2 I / I )CONCRETE WALK )CONCRETE Ld6 m GL c, 0 1 ��„ -- \ I W _-1 -LOT, )u6HT POLE N)FcrvLED PLAY Ynf NATURAL TER AN A 1 (E) ADJ PROFERTY OWNER.. DALLAS `.MERMAN 45616IS6AP 5TREET PALEL ID.. 39-25-,2-002 LONG PHAN PAN aJ 45% (E)LAND5LAFE BED - (E) LAWN AREA M 4 FT GATE Ob 10 VIF— M 4 FT HIGH LHAN A FCNLE(POWTJERW BLACK Oft GREEN) N) Lia LONG sIrWA dLANDN55 - - I / 25'-O" 5ET8ALK SAND PAY AREA5 6 RAY 5TFU6TURE -MAX LRE H 5TRIJ6TEIGHT NTE 8 VE DE -O" ABOAFA STOP SIGN FT FEZ• R6-1 50 25% :NEOe FOR 1- HR FIRE tS PEft BL TABLE 121. 1-1.2 NO PARKING ANY TIME R7-1 FEER�VEDRKING I METAL GUARD RAIL ft TANN6 WALL 5TAPP PRE5GHOOL 1 5 S) 6W WALL 1 1 ELEMENTARY (E) ADJ PROPERTY III GENERAL OVAIEft. 5PKLMTED LLA 1.1 POPULATION STUDENTS 200 LIPAN 5TREET 5TAPP PRESCHOOL O DENVER LO &0203 INFANTS I PA,BLID. 39451-12-T9 I (E) LONG DRAN PAN p 15% 1 m B AREA 2 51 11 ]493 OF N)ALLE55BLE (E) ADJ PROPERTY � LLRB RAMP p yITN6 MASONRY WALL I p YMEft EXTEWOR WALL) LOWER EL(15T-3RD) 25 jV0 5MM MAONRY N)5TEEL E6 55 WD 1 .KNE55 FOR 2- HR FIRE 5TAIR DOWN FROM „ N6 PER 036 TABLE 121.1.2 MEZZANNE N y REQUIRED 5PAGE5 PRE5GHOOL 51/5. 1 11/1. 11 I �) LHAN LNK FENCE I I t ° o 71, i) --s N) E6 Oe 5TAIR 1 N VAN ALLE55BLE M REFUSE AREA PARKNs `PALE O (E) 6A5 FETEF W/ PO5T MTDF 1b d N RgLN5 VANA66E5513LE PAW 5'_ NEW L K ('c bN5 SIGN (E)LANC6APE BED - TTP �OF VAN ACCESSIBLE R7 -8P N) POST Oft WALL MTDJ ONE WAY' USN (F6 1) -106'-1115116 W NOT ALL P05T MTD LOADN5 ONLY 516N ®Oi (R9-36P)®2NEN D_N 6OMPA6T 5PAGE5 �1 0 U W NEWA66E`.503LE _ PARKN5 SPACE JS W/POST NTD O Q ~ALLE550 US PARKN6 SIGN III b (ftl-9) S a e � E Z I � J � 4 N 4 ._._._._._._--- - j r T)LAM iR A \\\\\I I II III \ (E, PNE (1 5 FT LANO�, K fE) c CRETE WALK E (ft5-36P) ® l NEW 6OMPA6T 5PAGE5 OT 3 LO 4 LOT 5 LOT 6 V� 12100'111 AM – —0 AMES STREET N) P05T MTD NO PAWNS" (IJ) P05T MTD NO PARKN6' (60'RO.W) 516N 1{ft9-3a) W/ 2- (Rb -3hP) 516N 1{ft9-3a) W/ 2-(R9-3hP) Aft Y,15 ON ft9-3hP TO PONT W6HT Aft ONL5 ON ft9-3hP TO PONT EA WAY 25'-O" 60'-O" 60'-O" SITE PLAN K 0 1/16.._ 1._0.. z 6URB6� N) PO5T MTD "5TOP' 56N (E) CONCRETE 66 6 (R 1-1) W/ NO LEFT TURN' 56N (P 3-2) PnSTMTD NnPARKNF. PARKIN6 5UMMARY LOADING ZONE 4=I R8-3gP (E) ADJ PROPERTY OWNER.. 3355 1I I-EWDAN BOULEVARD 5010 EVW MAR DRVE TTLETON LO eo,23 ALEL ID.. 39-25,-,2-004 (E) ADJ PROPER' RETANN6 WALL (E) LM) WALL O O IPARKINGI R8 -3a 6:00 AM TO 6:00 PM 6:00 AM TO 6:00 PM HOUR5 ON TH15 SIGN TO REAP: 'I:00 PNM TO 8:30 PNM HOUR5 ON TH15 SIGN TO REAP: 3:30 PM TO 5:30 PM REQUIRED RATIO METAL GUARD RAIL PAGULTY 5TAPP PRE5GHOOL 1 5 1 1 1 1 ELEMENTARY (E) ADJ PROPERTY III GENERAL OVAIEft. 5PKLMTED LLA 1.1 POPULATION STUDENTS 200 LIPAN 5TREET 5TAPP PRESCHOOL O DENVER LO &0203 INFANTS I PA,BLID. 39451-12-T9 I TODDLERS I4 7 1 m PRESCHOOL TOTAL 51 11 1 O (E) ADJ PROPERTY � p ~AAPHALT PARKN5 AREA I 6 1IE� LOWER EL(15T-3RD) 25 2 1 —OVERHEAD UTLITY LME 25 2 „ TO 5TREET LISHT 103 10 y REQUIRED 5PAGE5 PRE5GHOOL 51/5. 1 11/1. 11 I �) LHAN LNK FENCE I I 10/1. 10 I Fe II I I I m mIU o "U5E 571UDENT5/20 - 5 5PAGE5 (ONLY gIg gIg gI; PARK INA PROVIDED GENERAL - 149.98 Ate\ - - — _ J\ 150' REL_ 1 — - A124 2b AM 1 _ f - LOADING \r— \r— \r TOTAL ") LIGHT POLE (1 i REQUIRED RATIO STUDENTS PAGULTY 5TAPP PRE5GHOOL 1 5 1 1 1 1 ELEMENTARY GREATER OF1/20 STUDENTS OR 1/GLA55ROOM GENERAL 1.1 POPULATION STUDENTS PAGULTY 5TAPP PRESCHOOL O INFANTS 1 4 TODDLERS 355 7 1 m PRESCHOOL TOTAL 51 11 1 ELEMENTARY � In W PRIMARY(EGE3-K) 53 6 1 LOWER EL(15T-3RD) 25 2 1 UPPER EL(4TH-6TH) 25 2 1 ELEMENTARY TOTAL 103 10 3 REQUIRED 5PAGE5 PRE5GHOOL 51/5. 1 11/1. 11 1/1. 1 19 ELEMENTARY 103/20.5.... 10/1. 10 3/1. 3 15 TOTAL REQUIRED 12 21 4 31 • 5PAGE5 TO BE DE516NATED A5 LOADING ONLY "U5E 571UDENT5/20 - 5 5PAGE5 (ONLY 4 GLA55ROOM5) PARK INA PROVIDED GENERAL 30 LOADING 01 TOTAL 31 PLUS 2 AGGE5515LE (1 VAN AGGE5515LE) (3 7 TOTAL INCLUDES 35 FULL SIZE AND 2 COMP AGT [5.7%]) p) FIRE 1 00294 A ♦II♦ City of W heatRjdge COMMUNITY DEVILOPMENIT APPROVED Reviewed for Code Comolianm Randy Slusser 6/18/2020 Plans Examiner Date WmItwof nmN:TheilwMxe o/opslmRn wpowraJy sostrol ertlmmpubMmahvNmt M aOAmR(w, rvm eppwW oj, ary mWam b wn el rh powrima q He OudAn9 wNe ar a7WI M'adwN.ee. hrmM pnwmnN ro gM ouManry ro MWolepmri[ellNe pwtLma afIMIYWIIq mdsamMrpmrianaeo/qe UryNwNrot Ne NNN6 REVISION IREVISON 3 CHANGES APPROVED All inf'omution, drown or written on Gs document is the origiwl unpublished work of the Arolutect. Duplication, disclosure, or use of Gs work withoutthe consent of the Architect is prolubited. The R T O Group, Ltd. ♦ Architects Date Issue 01/14/20 OON5TRL TION 02/25 20 REVIS'ON5 0M03/20 FD. REV150N5 06/05/20 OWNER REVIS'ON5 W ' a O F ' m o � � In W I I �I ♦II♦ City of W heatRjdge COMMUNITY DEVILOPMENIT APPROVED Reviewed for Code Comolianm Randy Slusser 6/18/2020 Plans Examiner Date WmItwof nmN:TheilwMxe o/opslmRn wpowraJy sostrol ertlmmpubMmahvNmt M aOAmR(w, rvm eppwW oj, ary mWam b wn el rh powrima q He OudAn9 wNe ar a7WI M'adwN.ee. hrmM pnwmnN ro gM ouManry ro MWolepmri[ellNe pwtLma afIMIYWIIq mdsamMrpmrianaeo/qe UryNwNrot Ne NNN6 REVISION IREVISON 3 CHANGES APPROVED All inf'omution, drown or written on Gs document is the origiwl unpublished work of the Arolutect. Duplication, disclosure, or use of Gs work withoutthe consent of the Architect is prolubited. The R T O Group, Ltd. ♦ Architects Date Issue 01/14/20 OON5TRL TION 02/25 20 REVIS'ON5 0M03/20 FD. REV150N5 06/05/20 OWNER REVIS'ON5 Yrolect No: 62-2131 Drawing A004 REVISION City of Wheat Ridge Building Division Allinfo=ton, drz orw tmmfNsdowmmf is MeonVmlwpoblishe aorkoftheAmhifeof Doplimtlon, Nsclosove, o ure of Mis u rk wi out Memnsenfof Me Amhifeo ispmhihte The R T O Group, Ltd. Architects Date Issue O G0115TftWTION L RP Col 04/0520 LU 06/05/20 OhN RE Eio1 LU �LU O Q M w Date Issue 0V14/20 G0115TftWTION 02/28/20 RP Col 04/0520 FORE 001 06/05/20 OhN RE Eio1 Project No: 62-2151 Drawing A005 ODOOR SCHEDULE UNLE55 NOTED OTHERWI5E ON THE FLOOR PLAN, ALL DOORS, FRAMES 4 HARDWARE ARE EXI5TING BUILDING STANDARD TO REMAIN. REMOVE EXI5TING ORBITAL HARDWARE AND REPLACE WITTH NEW AN51 1 1 l.1 COMPLIANT LEVER OPERATING HARDWARE (LATCH OR LOCK 5ET TO MATCH EXI5TING FUNCTION) DOOR, FRAME 4 HARDWARE COMPONENT5 OR A55EMBLIE5 5ALVAGED FROM DEMOLITION AND MEETING 5PECIFICATION5 BELOW MAY BE REU5ED A EXI5TING ENTRY/EGRE55 5TOREFRONT DOOR W/ MFGR 5TD HARDWARE, CLO5ER, WEATHER 5EAL AND RIM TYPE PANIC EXIT DEVICE (INTERIOR) W/ LEVER OPERATOR (EXTERIOR) TO REMAIN B EXI5TING DOOR 4 FRAME 4 HARDWARE A55EMBLY TO REMAIN. REMOVE LATCH/LOCK 5ET AND REPLACE WITH NEW 5GHLAGE ND 5ERIE5 LEVER TYPE CLA55ROOM 5EGURITY LOCK (ND -75PD OR EQUAL). G NEW FLUSH VENEER 5-0" X l'-0" X 1-3/4" 50LID GORE INTERIOR DOOR MATCHING FIGURE, 5PEGIE5 4 FIN15H OF EXI5TING IN NEW H.M. FRAME W/ 1- 1/2 PR BUTT5, 51LENCER5 AND 5GHLAGE ND 5ERIE5 LEVER TYPE CLA55ROOM 5EGURITY LOCK (ND -75PD OR EQUAL) D NEW FLUSH VENEER 5-0" X l'-0" X 1-3/4" 50LID GORE INTERIOR DOOR MATCHING FIGURE, 5PEGIE5 4 FIN15H OF EXI5TING IN NEW H.M. FRAME W/ 1- 1/2 PR BUTT5, 51LENCER5 AND LEVER TYPE 5TOREROOM FUNCTION LOC1<5ET (AN51 F86) E NEW PAIR FLUSH VENEER 5-0" X l'-0" X 1-3/4" 50LID GORE INTERIOR DOORS MATCHING FIGURE, 5PEGIE5 4 FIN15H OF EXI5TING IN NEW H.M. FRAME W/ 1- 1 /2 PR BUTT5 EA LEAF, 51LENCER5, MANUAL FLUSH BOLT OON DUMMY LEAF AND LEVER TYPE 5TOREROOM FUNCTION LOC1<5ET ON ACTIVE LEAF (AN51 F86) F NEW FLUSH VENEER 5-0" X l'-0" X 1-3/4" 50LID GORE INTERIOR DOOR MATCHING FIGURE, 5PEGIE5 4 FIN15H OF EXI5TING IN NEW H.M. FRAME W/ 1- 1/2 PR BUTT5, 51LENCER5 AND LEVER TYPE OFFICE FUNCTION LOC1<5ET (AN51 F52) G NEW FLUSH VENEER 5-0" X l'-0" X 1-3/4" 50LID GORE INTERIOR DOOR MATCHING FIGURE, 5PEGIE5 4 FIN15H OF EXI5TING IN NEW H.M. FRAME W/ 1- 1/2 PR BUTT5, 51LENCER5, CLO5ER, ROOM NAME PLATE AND LEVER TYPE PRIVACY FUNCTION LOCK5ET (AN51 Fl(0) H NEW FLUSH VENEER 5-0" X l'-0" X 1-3/4" 50LID GORE INTERIOR DOOR MATCHING FIGURE, 5PEGIE5 4 FIN15H OF EXI5TING IN NEW H.M. FRAME W/ 1- 1/2 PR BUTT5, 5MOKE 5EAL, CLO5ER AND 5GHLAGE 30 5ERIE5 RIM TYPE PANIC DIVIGE. ALL COMPONENT5 TO HAVE 1- 1 /2 -HR MINIMUM FIRE LABEL J NEW FLUSH 5-0" X l'-0" X 1-3/4" IN5ULATED H.M. DOOR IN H.M. FRAME W/ 1- 1/2 PR BUTT5, WEATHER5EAL, CLO5ER, THRE5HOLD (LOW PROFILE) AND 5GHLAGE ND 5ERIE5 LEVER TYPE CLA55ROOM 5EGURITY LOCK (NDl5PD OR EQUAL) K NEW FLUSH 5-0" X l'-0" X 1-3/4" IN5ULATED H.M. DOOR IN H.M. FRAME W/ l'-0" X 1-3/4" IN5ULATED H.M. 50LID 51DELIGHT PANEL, 1- 1 /2 PR BUTT5, WEATHER5EAL, CLO5ER, THRE5HOLD (LOW PROFILE) AND 5GHLAGE ND 5ERIE5 LEVER TYPE CLA55ROOM 5EGURITY LOCK (NDl5PD OR EQUAL) L NEW FLUSH VENEER 5-0" X l'-0" X 1-3/4" 50LID GORE INTERIOR DOOR MATCHING FIGURE, 5PEGIE5 4 FIN15H OF EXI5TING IN NEW H.M. FRAME W/ 1- 1/2 PR BUTT5, CLO5ER, 5MOKE5EAL AND 5GHLAGE ND 5ERIE5 LEVER TYPE CLA55ROOM 5EGURITY LOCK (NDl5PD OR EQUAL) - DOOR, FRAME 4 ALL HARDWARE COMPONENT5 TO HAVE 20 -MIN FIRE LABEL MINIMUM M NEW PAIR 2-'6" X l'-0" X 1-3/4" FLUSH HOLLOW METAL DOORS IN NEW H.M. FRAME W/ 1- 1/2 PR BUTT5 EA LEAF, CL05ER EA LEAF, COORDINATOR, A5TRAGAL, 5MOKE5EAL AND RIM TYPE PANIC, EXIT DEVICE (5ARGENT 30 5ERIE5 OR EQUAL) EA LEAF (W/ LEVER OPERATOR ON HALL 5IDE) AND MAGNETIC HOLD -OPEN EA LEAF N NEW PREFINI5HED ALUMINUM 5TOREFRONT FRAME TO MATCH EXI5TING WINDOW5 W/ 5-0" X l'-0" MEDIUM 5TYLE 5TOREFRONT DOOR, MFGR STANDARD BUTT5, CLO5ER, 4 RIM TYPE PANIC DEVICE W/ 1 " IN5ULATED GLA55 51DELIGHT E a F 1 B 1 G 1 uAUND" 19 1'-3-5" CL05ET 02/25/20 REVI5ION5 106 -III - 121 06/05/20 1 G 1 --- I D ST,4 ST,4 N N G O 5TAFF BREAK RM 1 11-7 - - - STAFF LOUNGE 11 E N N m� - 115 -- -- X N m 1- O 01 I - - - 5TAFF WC 11 m 120 -- E /Ir E E --- E PP ' HALL F2 52 G ✓✓✓� 116 E VE57I15ULE 10 9A UP UPPER EXER05E 115 1 I F1 B1 I 1 rd 1 I I I UP F1 B1 GL05Er W 1 r 1 113 114 INTERIOR YVALL CONSTRUCTION METAL STUD THIGKNE55 REQUIREMENT5 - TYPICAL @ ALL NEW PARTITIONS 4 UNLE55 NOTED OTHERWI5E: 2-1/2" STUD FURRING SHALL BE 25 GA (25051 25-1 5) MINIMUM 3-5/5" STUD FURRING SHALL BE 25 GA (3(0251 25-1 5) MINIMUM 3-5/5" 5TUD5 1 O -FT AND UNDER IN LENGTH SHALL BE 25 GA (3(025125-15) MINIMUM 3-5/5" 5TUD5 OVER 1 O -FT IN LENGTH SHALL BE 20 GA DRYWALL 5TUD5 (3625125-30) MINIMUM UNLE55 NOTED OTHERWI5E ALL PARTITIONS AND WALL5 5HOWN ON THE FLOOR PLAN ARE EXI5TING WITH SMOOTH FINI5HED PAINTED GYP BD EACH 5IDE, TO REMAIN A NEW INTERIOR PARTITION 3(025125-30 METAL 5TUD5 @ 24" O.G. W/ 1 LAYER 5/5" GYP5UM BOARD EACH 5IDE W/ 3" SOUND ATTENUATION BLANKET5 (THERMAFIBER 5AF02.5 PGF OR EQUAL) EXTENDING TO EXI5TING FINI5HED CEILING ABOVE. FILL TAPE 4 SAND TO LEVEL 4 FIN15H B 111111100WEEM 5AME AS "A" ABOVE W/ (0005125-30 METAL 5TUD5 G NEW INTERIOR PARTITION (025125-30 METAL 5TUD5 @ 24" O.G. W/ 1 LAYER 5/5" GYP5UM BOARD EACH 5IDE EXTENDING TO EXI5TING FINI5HED CEILING ABOVE. FILL TAPE 4 SAND TO LEVEL 4 FIN15H D 5AME AS "C" ABOVE W/ (5005125-30 METAL 5TUD5 E NEW INFILL PARTITION 36251 25-1 5 METAL 5TUD5 @ 12" O.G. W/ 1 LAYER 5/5" GYP5UM BOARD EACH 5IDE TO UNDER5IDE OF EXI5TING OPENING HEADER (±l' -O" AFF). V.I.F. STUD 4 GYP BD THIGKNE55; FILL, TAPE 4 SAND TO LEVEL 4 FINISH. F NEW 2 -HR RATED INFILL PARTITION 36525125-15 METAL 5TUD5 @ 12" O.G. W/ 2 LAYERS 5/5" TYPE X GYP5UM BOARD EACH 5IDE TO UNDER5IDE OF EXI5TING OPENING HEADER (±l'-0" AFF). FILL, TAPE 4 SAND TO LEVEL 4 FINISH. COMPLY WITH REQUIREMENT5 OF G.A. A55EMBLY NO. GA WP- 15 2 2 GCCCCCMM2zz= NEW 1 -HR RATED PARTITION 36525125-30 METAL 5TUD5 @ 24" O.G. EXTENDING TO UNDER5IDE OF ROOF/CEILING 5TRUCTURE ABOVE. PROVIDE 1 LAYER 5/5" TYPE X GYP5UM BOARD ON HALL 5IDE TO UNDER5IDE OF NEW FINI5HED CEILING (9'-0" AFF) AND 1 LAYER 5/5" TYPE X GYP BD TO 4" MIN ABOVE HEW HALL CEILING ON ROOM 5IDE. NEW HALL CEILING. NEW CEILING COMPRI5ED OF WALL A55EMBLY IN5TALLED HORIZONTALLY PER IDG 5ECTION 105.4 EXCEPTION 3. FILL, TAPE 4 SAND TO LEVEL 4 FINISH. WALL 4 CEILING SHALL COMPLY WITH REQUIREMENT5 OF G.A. A55EMBLY NO. GA WP- 10 -7 2 H NEW 2 -HR RATED PARTITION 36525125-30 METAL 5TUD5 @ 24" O.G. EXTENDING TO 6-0" AFF W/ 2-LAYER5 5/5" TYPE X GYP BD EACH 5IDE. TURN A55EMBLY 452 AND EXTEND UP TO ADJACENT MA50NRY WALL. AT END WALL, PROVIDE 5TUD5 4 GYP BD AS ABOVE UP TO UNDER5IDE OF 452 A55EMBLY. FILL, TAPE 4 SAND TO LEVEL 4 FINISH. WALL 4 CEILING SHALL COMPLY WITH REQUIREMENT5 OF G.A. A55EMBLY NO. GA WP -1522 J NEW HALF -HEIGHT PARTITION 36525125-30 METAL 5TUD5 @ 16' O.G. W/ 1 LAYER 5/5" GYP5UM BOARD EACH 5IDE EXTENDING TO 45" AFF. FILL TAPE 4 SAND TO LEVEL 4 FIN15H F3 BE N3G1 O 1�1 F2 B2` I I� TOILgT'RNI 124 2C, 1 J ` F2 52 5 3 1 0'1 TODDLER 1 kN2C 1 123 E Bs/a" Bs/a" E ++B'-1 1/4..++ E o = ❑U) O ■ FURNACE - 1 1 1 r_ LOWER EXERCI5E ROOM 112 F1 B1 kN 1G1 F3 B3 3G2 G Bs/a" +_5'-2s --- O F2 B2 I � 2G2 ry VE5TIBULE �74 - J12 9 ----INFANT GARS 2 MS t - r 10 130 TOILET RM H 12 ^ m I i N -- -- -- - Q - I m m TODDLER 2 N m 121 F2 dE32HFFM E 5 kN 2 N ® 107 E I B3 1 4 F3 ` - J -' 10 -77 kN 3 G 2 TOIL T 105 - - Ill A I A g II J TOL RM 1 IF TE3 3 F2 B2 7-1- 10� 7;j �I 3G2 kN 2G2 U) 'RI-] rr---ML OMARY CARE 2 F 2 B 2 - 1"+ A 5 N 107 2G2 A® nH O KEYED PLAN NOTES A NEW 60" X 24" STAINLESS STEEL TABLE FURNISHED 4 INSTALLED BY OWNER B REMOVE EXISTING LATCH OR LOCK SET FROM EXISTING DOOR ASSEMBLY. FURNISH 4 INSTALL NEW SGHLAGE ND SERIES LEVER TYPE CLASSROOM SECURITY LOCK (ND -75PD OR EQUAL) G FURNISH 4 INSTALL NEW CLIP. CONCRETE LANDING D PROVIDE ADD ALTERNATE PRICE TO FURNISH 4 INSTALL NEW CHILD HEIGHT TOILET 4 LAVATORY W/ FINISHES 4 ACCESSORIES PER DETAIL 4/A 10 -7 1 GENERAL NOTES AS A MINIMUM STANDARD ALL WORK PERFORMED AND MATERIALS INSTALLED SHALL BE IN STRICT CONFORMANCE WITH APPLICABLE CODES AND ORDINANCES AS A MINIMUM STANDARD ALL MATERIALS INSTALLED SHALL BE NEW AND IN STRICT COMPLIANCE WITH APPLICABLE FLAME SPREAD REQUIREMENTS OF GOVERNING CODES, ORDINANCES 4 STANDARDS THE CONTRACTOR AND HIS SUB -CONTRACTORS SHALL BE RESPONSIBLE FOR REVIEWING ALL PROJECT DOCUMENTS AND FOR FIELD VERIFYING ALL EXISTING AND PROPOSED CONDITIONS. THE Or- SHALL GSHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY CONFLICT DISCREPANCY OR OMISSION FOR DIRECTION BY THE ARCHITECT PRIOR TO COMMENCING WORK ON THE ITEM IN QUESTION UNLES NOTED OTHERWISE ALL DIMENSIONS ARE TO FACE OF STUD OR GRIDLINE. REFER ANY QUESTIONS TO THE ARCHITECT - DO NOT SCALE DRAWINGS WHERE MILLWORK, PREMANUFACTURED CABINETS, TOPS, NEW INTERIOR DOOR OPENINGS, ACCESSORIES, ETC ARE INDICATED ON THE DRAWINGS, THE GG SHALL BE RESPONSIBLE FOR COORDINATING THE LOCATION AND INSTALLATION OF ALL BLOCKING AND BACKING REQUIRED FOR THE PROJECT THE GG SHALL COORDINATE SUBMITTALS AND SHOP DRAWINGS WITH THE PROGRESS OF THE WORK AND SHALL ALLOW A MINIMUM OF SEVEN ('I) BUSINESS DAYS FOR PROCESSING BY THE ARCHITECT. ALL SHOP DRAWINGS AND SUBMITTALS SHALL BE REVIEWED BY THE GG FOR CONFORMANCE WITH THE CONTRACT DOCUMENTS AND SO MARKED BEFORE TRANSMITTAL TO THE ARCHITECT. SHOP DRAWINGS AND SUBMITTALS NOT SO REVIEWED WILL BE RETURNED WITH NO ACTION BY THE ARCHITECT. UO U m 1 10 2B2 2G2, N I N OFFICE in N 104 I MAIN FLq0f;Z PLAN 1/511=1'-O" 25'-0" E r6 B Bs/a" Bs/a" F2 dE32 2 INFANT GARS 2 6 132 107 1 O'1 O.H. D A B QD • QD QD Q� H) B 1 F2 52 .� HALL 1G12G1 134 E g B 40 O U) D ■ B B I O V__ O ■ F 2 B 2 � FURNACE ----- m 139 2C, 1 TOIL F3 dE33 B 8,-1/3 13-7 1• 1' 3 O 1 E O HALL 135 TODDLER 3 0] � --1 140 2G2 5 F3 53 10� PRIMARY GARS 1 105 138 F2 E32 O 2G2 F1 B1 F � O HALL GIRLS WG 3 146 145 G E F2 B 2 10'-0° 2'-6° 10'- I A 2 G 1 B 141 FURNACE m I E VE5IBUL - - - - 144 (N) 31/7' X 11 L5L-1.55E B M 4 G F2 52 ELEMENTARY 1 1 O 143�� 2 C,2 142 ADMINIS RATION - UP 103 o E 51MW/2X4 5TUD5 @ 16 F2 52 " O.G. WG. LIF 102 iq (N) 31/2„ 11 L5L-1. 5E BEA 2G2 In _ uP R= 68'-O" in 3 r - - O - - - - O - - G E 51M W/ 2 X 4 I 5TUD5 @ 16" O.G. OFFICE N 101 N F2 B2 I (N 5 AI P VE5TIBULE 100 kN2C2 30" x 45" EXT FURNI5H 4 INSTALL NEW: GRAVENTA O OR EQUAL 5ERIE5 3 WHEELCHAIR REFUGE AREA I - - - - LIFT W/ ENCLO5E0 H015TY`1AY 5 1 O 1 ENLARGED PLAN + FINISH MATERIAL NOTES FLOOR F B BA5E WALL W G CEILING FLOOR F 1 EXI5TING TO REMAIN F2 L\/T: WOOD -LOOK LUXURY VINYL TILE: COLOR 4 MANUFACTURER TO BE 5ELEGTED F3 NEW CERAMIC, TILE: DAL "KEY5TONEV COLORBODY PORCELAIN M05AIC FLOOR TILE, 2" X 2" X 1/4" PRIGS GROUP l; COLOR AS 5ELEGTED BY TENANT, STANDARD FIELD PATTERN DP3003 F4 EXI5TING FLOOR FIN15H TO REMAIN UNCHANGED BA5E 151 EXI5TING TO REMAIN 02 4" RE5ILIENT COVE BA5E: ROPPE "LIGHT BROWN" # 14 -7 03 NEW CERAMIC, TILE: DAL '5EMI-GLO55/MATTE" GLAZED GERAMIG WALL TILE, 6' X 6" A3601 FLAT TOP COVE BA5E TO MATCH WALL TILE W3 BELOW WALL W 1 EXI5TING TO REMAIN W2 PAINT: SPOT PRIME W/ 1 FIN15H GOAT AT EXI5TING PARTITION5; 1 GOAT TINTED PRIMER, 2 FIN15H COAT5 AT NEW PARTITIONS - 5HERWIN WILLIAM5 PROMAR 200, LATEX ENAMEL, COLOR 5W101 6 MINDFUL GRAY. MATCH 5HEEN OF EXI5TING W3 NEW CERAMIC, TILE WAIN5COAT: DAL '5EMI-GLO55/MATTE" GLAZED GERAMIG WALL TILE, 4-1/4" X 4-1/4" X 5/165" WALL TILE, PRIGS GROUP 2; COLOR AS 5ELEGTED BY TENANT TO 45" AFF W/ SMOOTH FIN15H PAINTED GYP BOARD ABOVE (5EMI-GLO55 LATEX ENAMEL) CEILING G 1 EXI5TING TO REMAIN C,2 NEW 51,15PENDED PREFINI5HED 15/165" 5RID (WHITE) W/ NEW 2 X 4 LAY -IN AC01,15TIC TILE: ARM5TRONG RADAR OR EQUAL REFERENCE ASSEMBLIES O N 0 GA FILE NO. WP 1072 I I GENERIC I GYPSUM WALLBOARD, STEEL STUDS One layer s/8" type X gypsum wallboard or gypsum veneer base applied parallel or at right angles to each side of 35/8" steel studs 24" o.c. with 1" Type S drywall screws 8" o.c. at vertical joints and 12" o.c. at floor and ceiling runners and intermediate studs. Joints staggered 24" on each side and on opposite sides. Sound tested with 31/2" glass fiber friction fit in stud space. (NLB) GA FILE NO. WP 1522 I I GENERIC I GYPSUM WALLBOARD, STEEL STUDS Base layer 518" type X gypsum wallboard or gypsum veneer base applied parallel or at right angles to each side of 35/8" steel studs 24" o.c. with 1" Type S drywall screws 24" D.C. Face layer 5/8" type X gypsum wallboard or gypsum veneer base applied parallel or at right angles to each side with 15/8" Type S drywall screws 12" D.C. Joints staggered 24" each layer and side. Sound tested with 3112" glass fiber friction fit in stud space. (NLB) NEW GONG LANDING (E) GONG LANDING NEW GONG LANDING NEW GONG 51DEWALK 1 HOUR 45 to 49 STC FIRE SOUND Thickness: 47/8 " Approx. Weight: 6 psf Fire Test: See WP 1350 (FM WP -45, 6-19-68; OSU T-1770, 8-61; ULC 79T484, 79T500,79T497, 8-12-81, ULC Design W415) Sound Test: NRCC 816 -NV, 2-3-81 2 HOUR 55 to 59 STC FIRE SOUND Thickness: 6118" Approx. Weight: 12 psf Fire Test: See WP 1548 (WHI-495-0236, 1-30-80) Sound Test: NRCC 818 -NV, 2-3-81 REVISION City of Wheat Ridge Building Division All information, drawn or written on this document is the original unpublished work of the Architect. Duplication, disclosure, or use of this work without the consent of the Architect is prohibited. The R T O Group, Ltd. A r c h i t e c t s i� Issue LEARNING LAB GON5TRUGTION 02/25/20 REVI5ION5 106 w� 06/05/20 OWNER REVI5ION5 3s/a° 1'-9 s Bs/a" WW� 24-6 G N N m� F - --- --- N m 1- O 01 I L m 110 1 mw LU ' z 1 G VE57I15ULE 10 9A N' E HALL M O 109 E M N O -� O KEYED PLAN NOTES A NEW 60" X 24" STAINLESS STEEL TABLE FURNISHED 4 INSTALLED BY OWNER B REMOVE EXISTING LATCH OR LOCK SET FROM EXISTING DOOR ASSEMBLY. FURNISH 4 INSTALL NEW SGHLAGE ND SERIES LEVER TYPE CLASSROOM SECURITY LOCK (ND -75PD OR EQUAL) G FURNISH 4 INSTALL NEW CLIP. CONCRETE LANDING D PROVIDE ADD ALTERNATE PRICE TO FURNISH 4 INSTALL NEW CHILD HEIGHT TOILET 4 LAVATORY W/ FINISHES 4 ACCESSORIES PER DETAIL 4/A 10 -7 1 GENERAL NOTES AS A MINIMUM STANDARD ALL WORK PERFORMED AND MATERIALS INSTALLED SHALL BE IN STRICT CONFORMANCE WITH APPLICABLE CODES AND ORDINANCES AS A MINIMUM STANDARD ALL MATERIALS INSTALLED SHALL BE NEW AND IN STRICT COMPLIANCE WITH APPLICABLE FLAME SPREAD REQUIREMENTS OF GOVERNING CODES, ORDINANCES 4 STANDARDS THE CONTRACTOR AND HIS SUB -CONTRACTORS SHALL BE RESPONSIBLE FOR REVIEWING ALL PROJECT DOCUMENTS AND FOR FIELD VERIFYING ALL EXISTING AND PROPOSED CONDITIONS. THE Or- SHALL GSHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY CONFLICT DISCREPANCY OR OMISSION FOR DIRECTION BY THE ARCHITECT PRIOR TO COMMENCING WORK ON THE ITEM IN QUESTION UNLES NOTED OTHERWISE ALL DIMENSIONS ARE TO FACE OF STUD OR GRIDLINE. REFER ANY QUESTIONS TO THE ARCHITECT - DO NOT SCALE DRAWINGS WHERE MILLWORK, PREMANUFACTURED CABINETS, TOPS, NEW INTERIOR DOOR OPENINGS, ACCESSORIES, ETC ARE INDICATED ON THE DRAWINGS, THE GG SHALL BE RESPONSIBLE FOR COORDINATING THE LOCATION AND INSTALLATION OF ALL BLOCKING AND BACKING REQUIRED FOR THE PROJECT THE GG SHALL COORDINATE SUBMITTALS AND SHOP DRAWINGS WITH THE PROGRESS OF THE WORK AND SHALL ALLOW A MINIMUM OF SEVEN ('I) BUSINESS DAYS FOR PROCESSING BY THE ARCHITECT. ALL SHOP DRAWINGS AND SUBMITTALS SHALL BE REVIEWED BY THE GG FOR CONFORMANCE WITH THE CONTRACT DOCUMENTS AND SO MARKED BEFORE TRANSMITTAL TO THE ARCHITECT. SHOP DRAWINGS AND SUBMITTALS NOT SO REVIEWED WILL BE RETURNED WITH NO ACTION BY THE ARCHITECT. UO U m 1 10 2B2 2G2, N I N OFFICE in N 104 I MAIN FLq0f;Z PLAN 1/511=1'-O" 25'-0" E r6 B Bs/a" Bs/a" F2 dE32 2 INFANT GARS 2 6 132 107 1 O'1 O.H. D A B QD • QD QD Q� H) B 1 F2 52 .� HALL 1G12G1 134 E g B 40 O U) D ■ B B I O V__ O ■ F 2 B 2 � FURNACE ----- m 139 2C, 1 TOIL F3 dE33 B 8,-1/3 13-7 1• 1' 3 O 1 E O HALL 135 TODDLER 3 0] � --1 140 2G2 5 F3 53 10� PRIMARY GARS 1 105 138 F2 E32 O 2G2 F1 B1 F � O HALL GIRLS WG 3 146 145 G E F2 B 2 10'-0° 2'-6° 10'- I A 2 G 1 B 141 FURNACE m I E VE5IBUL - - - - 144 (N) 31/7' X 11 L5L-1.55E B M 4 G F2 52 ELEMENTARY 1 1 O 143�� 2 C,2 142 ADMINIS RATION - UP 103 o E 51MW/2X4 5TUD5 @ 16 F2 52 " O.G. WG. LIF 102 iq (N) 31/2„ 11 L5L-1. 5E BEA 2G2 In _ uP R= 68'-O" in 3 r - - O - - - - O - - G E 51M W/ 2 X 4 I 5TUD5 @ 16" O.G. OFFICE N 101 N F2 B2 I (N 5 AI P VE5TIBULE 100 kN2C2 30" x 45" EXT FURNI5H 4 INSTALL NEW: GRAVENTA O OR EQUAL 5ERIE5 3 WHEELCHAIR REFUGE AREA I - - - - LIFT W/ ENCLO5E0 H015TY`1AY 5 1 O 1 ENLARGED PLAN + FINISH MATERIAL NOTES FLOOR F B BA5E WALL W G CEILING FLOOR F 1 EXI5TING TO REMAIN F2 L\/T: WOOD -LOOK LUXURY VINYL TILE: COLOR 4 MANUFACTURER TO BE 5ELEGTED F3 NEW CERAMIC, TILE: DAL "KEY5TONEV COLORBODY PORCELAIN M05AIC FLOOR TILE, 2" X 2" X 1/4" PRIGS GROUP l; COLOR AS 5ELEGTED BY TENANT, STANDARD FIELD PATTERN DP3003 F4 EXI5TING FLOOR FIN15H TO REMAIN UNCHANGED BA5E 151 EXI5TING TO REMAIN 02 4" RE5ILIENT COVE BA5E: ROPPE "LIGHT BROWN" # 14 -7 03 NEW CERAMIC, TILE: DAL '5EMI-GLO55/MATTE" GLAZED GERAMIG WALL TILE, 6' X 6" A3601 FLAT TOP COVE BA5E TO MATCH WALL TILE W3 BELOW WALL W 1 EXI5TING TO REMAIN W2 PAINT: SPOT PRIME W/ 1 FIN15H GOAT AT EXI5TING PARTITION5; 1 GOAT TINTED PRIMER, 2 FIN15H COAT5 AT NEW PARTITIONS - 5HERWIN WILLIAM5 PROMAR 200, LATEX ENAMEL, COLOR 5W101 6 MINDFUL GRAY. MATCH 5HEEN OF EXI5TING W3 NEW CERAMIC, TILE WAIN5COAT: DAL '5EMI-GLO55/MATTE" GLAZED GERAMIG WALL TILE, 4-1/4" X 4-1/4" X 5/165" WALL TILE, PRIGS GROUP 2; COLOR AS 5ELEGTED BY TENANT TO 45" AFF W/ SMOOTH FIN15H PAINTED GYP BOARD ABOVE (5EMI-GLO55 LATEX ENAMEL) CEILING G 1 EXI5TING TO REMAIN C,2 NEW 51,15PENDED PREFINI5HED 15/165" 5RID (WHITE) W/ NEW 2 X 4 LAY -IN AC01,15TIC TILE: ARM5TRONG RADAR OR EQUAL REFERENCE ASSEMBLIES O N 0 GA FILE NO. WP 1072 I I GENERIC I GYPSUM WALLBOARD, STEEL STUDS One layer s/8" type X gypsum wallboard or gypsum veneer base applied parallel or at right angles to each side of 35/8" steel studs 24" o.c. with 1" Type S drywall screws 8" o.c. at vertical joints and 12" o.c. at floor and ceiling runners and intermediate studs. Joints staggered 24" on each side and on opposite sides. Sound tested with 31/2" glass fiber friction fit in stud space. (NLB) GA FILE NO. WP 1522 I I GENERIC I GYPSUM WALLBOARD, STEEL STUDS Base layer 518" type X gypsum wallboard or gypsum veneer base applied parallel or at right angles to each side of 35/8" steel studs 24" o.c. with 1" Type S drywall screws 24" D.C. Face layer 5/8" type X gypsum wallboard or gypsum veneer base applied parallel or at right angles to each side with 15/8" Type S drywall screws 12" D.C. Joints staggered 24" each layer and side. Sound tested with 3112" glass fiber friction fit in stud space. (NLB) NEW GONG LANDING (E) GONG LANDING NEW GONG LANDING NEW GONG 51DEWALK 1 HOUR 45 to 49 STC FIRE SOUND Thickness: 47/8 " Approx. Weight: 6 psf Fire Test: See WP 1350 (FM WP -45, 6-19-68; OSU T-1770, 8-61; ULC 79T484, 79T500,79T497, 8-12-81, ULC Design W415) Sound Test: NRCC 816 -NV, 2-3-81 2 HOUR 55 to 59 STC FIRE SOUND Thickness: 6118" Approx. Weight: 12 psf Fire Test: See WP 1548 (WHI-495-0236, 1-30-80) Sound Test: NRCC 818 -NV, 2-3-81 REVISION City of Wheat Ridge Building Division All information, drawn or written on this document is the original unpublished work of the Architect. Duplication, disclosure, or use of this work without the consent of the Architect is prohibited. The R T O Group, Ltd. A r c h i t e c t s i� Date Issue 0 GON5TRUGTION 02/25/20 REVI5ION5 04/03/20 w� 06/05/20 OWNER REVI5ION5 WW� V� 7- O�Q mw LU z Date Issue 01/14/20 GON5TRUGTION 02/25/20 REVI5ION5 04/03/20 F.D. REVI5ION5 06/05/20 OWNER REVI5ION5 Project No: 62-2131 Drawing 00 00 O ct M N 00 N 00 i O a� 0 a N 0 00 O 'd ct O O N > N Q N N 'd N M M �2-0.� MAIN FLOOR RG PLAN 1 1/5-1-0 STANDARD MIRROR STANDARD TOILET STANDARD GRAB BARS PAPER DISPENSER TYPIGAL TOILET ROOM AGGE5500RY DETAIL5 SCALE: 3/4 1 - O" STANDARD PAPER TOWEL DISPENSER STANDARD SANITARY DRINKING FOUNTAIN NAPKIN DISPOSAL SPOUT LOCATION 6Ei /24 X42' soiA�w57EE �eRen�2: oY FY 1� w�.�n`L ONM�YLe�PYR7FO� 6E2 1 1/24xe657Ar �sSffTaaee eeR. oYn Y.eeat eaae onM�YL5�FAR7FO� FA�7o � �E�R o � 1 � � o REVISION City of Wheat Ridge Building Division Allinfo=tov, drz orw ttmmtNsdowmmf is MeonVmlwpoblishe aorkoftheAmhifeo Doplimtlov, Nsclosove, o ure of Mis u rk wi out Memnsevfof Me Amhifeo ispmhihte The R T O Group, Ltd. Architects Date Issue 0V14/20 GTI15TftWTION 02/28/20 RP COI5 04/03/20 FORD SOI5 Drawing 62-2131 P •. I C ■ 0 T FLUE THERMOMETER (7 _ UNION (TYP.) GAS WATER HEATER GAS- DIRT AS -DIRT LEG WITH - I� THREADED CAP CONCRETE HOUSEKEEPING PAD 2 _CHECKVALVE SHUT-OFF VALVE (TYP.) iCIRCULATING PUMP \/ I 4 9F AQUASTAT, INTERLOCK WITH HOT WATER RETURN F THERMAL EXPANSION TANK EQUAL TO AMTROL ST -5. o SUPPORT FROM STRUCTURE. \PRESSURE& TEMP. RELIEF VALVE RUN FULL SIZE DRAIN LINE TO NEAREST FLOOR DRAIN, FLOOR SINK OR JANITOR'S BASIN AND o TURN DOWN (TYP) IiMIN. 1.5" DEEP DRAIN PAN ROUTE FULL SIZE TO NEAREST FLOOR DRAIN OR FLOOR SINKAND TURN DOWN 3 ) WATER HEATER DETAIL M102 1 SCALE: NOT TO SCALE 3 0 2 MEZZANINE PLUMBING PLAN - IMPROVEMENT M102 SCALE: 1/8" = 1'-0" Lv NORTH FURNACE 1 1 ) MAIN FLOOR PLUMBING PLAN - IMPROVEMENT M102 1 SCALE: 1/8" = 1'-0" 04/24/2020 LJ. LU 2 3 0 NORTH 5 GENERAL NOTES: A. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH THE 2012 EDITION OF THE INTERNATIONAL PLUMBING CODE AS ADOPTED BY THE CITY OF WHEAT RIDGE, CO. B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION PRIOR TO SUBMITTING HIS BID. NO EXTRAS WILL BE PAID DUE TO UNANTICIPATED EXISTING CONDITIONS. C. PLANS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS. D. DO NOT ROUTE PIPING BELOW ROOF HATCH OR ABOVE ELECTRICAL EQUIPMENT/ PANELS. E. ALL WASTE PIPING BELOW FLOOR SHALL SLOPE AT 2% MINIMUM UNLESS OTHERWISE INDICATED. PLAN HEX NOTES: 1 PROVIDE 3" VENT THRU ROOF. 2 PROVIDE AND INSTALL NEW JANITOR'S SINK. CONNECTALL PIPING CONNECTIONS LIKE CW, HW, WASTE, VENT ETC. FROM REMOVED MOP BASIN. 3 PROVIDE AND INSTALL NEW BI -LEVEL WATER COOLER. CONNECTALL PIPING CONNECTIONS LIKE CW, WASTE, VENT ETC. FROM REMOVED WATER COOLER. 4 PROVIDE 1.5" VENT DOWN. 5 PROVIDE 3" CIRCUIT VENT DOWN. 6 PROVIDE 2" VENT DOWN. 7 EXISTING GAS LINE GOING DOWN. 8 TAP NEW 2" GAS LINE (MIN. 7" WC PRESSURE). PROVIDE SHUT-OFF VALVE. 9 ROUTE NEW GAS LINE GOING UP AND ENTERING THE BUILDING ABOVE CEILING. PAINT TO MATCH BUILDING EXTERIOR. 10 ROUTE 1.25" GAS GOING UP AND ENTERING FLAT ROOF THROUGH SIDE WALL. 11 ROUTE 0.5" GAS GOING DOWN TO FURNACE. AT CONNECTION TO UNIT, PROVIDE SHUT-OFF VALVE, DIRT LEG (MIN. 6"), UNION AND PRESSURE REGULATOR SET TO 7" WC. 12 ROUTE 1" GAS GOING DOWN TO FURNACES AND BRANCH INTO 0.5" FOR EACH FURNACE. AT CONNECTION TO EACH UNIT, PROVIDE SHUT-OFF VALVE, DIRT LEG (MIN. 6"), UNION AND PRESSURE REGULATOR SET TO 7" WC. 13 ROUTE 1.25" GAS GOING DOWN TO ABOVE CEILING OF MAIN FLOOR. 14 ROUTE 0.5" GAS TO FURNACE IN ELEMENTARY 2. AT CONNECTION TO UNIT, PROVIDE SHUT-OFF VALVE, DIRT LEG (MIN. 6"), UNION AND PRESSURE REGULATOR SET TO7" WC. 15 ROUTE 0.5" GAS GOING DOWN TO FURNACE IN ELEMENTARY 1. 16 ROUTE 1.25" GAS PIPING THROUGH FLAT ROOF WALL. 17 PROVIDE PIPE SUPPORTS AS PER DETAIL 4 ON SHEET M300. 18 ROUTE INDIRECT WASTE FROM SINK TO THE FLOOR SINK BELOW. TURN WASTE PIPE DOWN INTO FLOOR SINK'S HALF GRATE TO AVOID SPLASH. 19 CONTRACTOR SHALL CONTACT THE LOCAL GAS UTILITY COMPANY TO COORDINATE IF THE EXISTING GAS METER IS ADEQUATE FOR THE TOTAL (EXISTING + NEW) LOAD. IF NECESSARY, CONTRACTOR SHALL PROVIDE NEW GAS METER AS PER THEIR DIRECTION. CONTRACTOR SHALL PAY ALL ASSOCIATED FEES IN CASE OF ANY CHANGES TO THE GAS METER AND TAP. THE EXISTING GAS LOAD FOR THE EQUIPMENT TO REMAIN (EXISTING 10 -TON RTU, EXISTING BOILER, REPLACED WATER HEATER) IS 2369000 BTUH AND THE NEW LOAD FOR NEW EQUIPMENT (7 NEW FURNACE) IS 528000 BTUH, THE TOTAL LOAD NOW BEING 2897000 BTUH. 20 PROVIDE 2" VENT DOWN AND BRANCH INTO 1.5" VENT FOR SINK AND 1.5" VENT FOR FLOOR SINK. 21 INSTALL RELOCATED WATER CLOSET FROM TOILET RM (124). CONNECT ALL PIPING CONNECTIONS LIKE CW, HW, WASTE, VENT, ETC. FROM REMOVED WATER CLOSET. 22 INSTALL RELOCATED LAVATORY FROM TOILET RM (124). 23 PROVIDEAND INSTALL NEW WATER CLOSET. CONNECTALL PIPING CONNECTIONS LIKE CW, WASTE, VENT ETC. FROM REMOVED WATER CLOSET. 24 PROVIDE AND INSTALL NEW LAVATORY. CONNECT ALL PIPING CONNECTIONS LIKE CW, HW, WASTE, VENT ETC. FROM REMOVED LAVATORY. 25 CONNECT WASHER OUTLET BOX TO EXISTING 0.5" CW AND 0.5" HW STUBS IN WALL. R REVISION City of Wheat Ridge Building Division L ■R C k1irtm engineering consultants CLIENT: THE RTO GROUP DENVER,CO EOR STAMP PROJECT: K 0 LLJ W 0 0 LU W H J U LLL LU 0 LJ. 0 W LU0 0 C0 G ISSUANCE: B PERMIT SET REVISIONS: # DATE 0 0 04/24/2020 LJ. LU LU 0 LU J JC/)U O V J W ` ^ V J LU fwn v O Q W 0 M LLJ 2 ISSUANCE: B PERMIT SET REVISIONS: # DATE DESCRIPTION NOT USED 04/24/2020 REVISIONS 06/11/2020 REVISIONS DATE: 12/30/2019 PROJECT NUMBER: 19. RT0.003 DRAWN BY: CHECKED BY: BH MB A SHEET TITLE: ABOVE GRADE PLUMBING PLANS IMPROVEMENT SHEET NO: F M102 I C ■ 0 T )000 "WH1 /- O, BOILER RM � B02 HALL B01 B04 2 STORAGE B03 BASEMENT HVAC PLAN - 3 IMPROVEMENT M201 SCALE: 1/8" = 1'-0" NORTH (C 3 4 - 2 MEZZANINE HVAC PLAN - IMPROVEMENT M201 SCALE: 1/8" = 1'-0" NORTH 1 MAIN FLOOR HVAC PLAN - IMPROVEMENT M201 I SCALE: 1/8" = 1'-0" 1 2 3 0 NORTH (C 5 L GENERAL NOTES: A. ALL MECHANICAL WORK SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE 2012 INTERNATIONAL MECHANICAL CODE AS ADOPTED BY THE CITY OF WHEAT RIDGE, CO. B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION PRIOR TO SUBMITTING HIS BID. NO EXTRAS WILL BE PAID DUE TO UNANTICIPATED EXISTING CONDITIONS. C. PLANS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS. D. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH SMACNA STANDARDS, MANUAL 15d. ALL SUPPLY AIR DUCT PRESSURE CLASSES SHALL BE THE SAME AS THE EXTERNAL STATIC PRESSURE (ESP) OF D THE EQUIPMENT SUPPLYING THE DUCT. THE EQUIPMENT ESP SHALL BE THE SAME PRESSURE CLASS FOR THE ENTIRE SUPPLY DUCT SYSTEM. E. ALL METAL DUCTWORK SPECIFIED TO RECEIVE INTERIOR THERMAL AND ACOUSTICAL LINER IS NOT SIZED ON PLANS TO INCLUDE THE PROPER THICKNESS OF INSULATION. ADD 1" OR 2" IN HEIGHT AND WIDTH OF DUCTWORK TO ACCOMMODATE THICKNESS OF F. ALL ROUND DUCTWORK SHALL BE SPIRAL. ALL DATE RECTANGULAR DUCTWORK, SHALL BE LINED WITH 2 LB DENSITY DUCT LINER. 0 G. BRANCH DUCTS SHALL BE THE SAME SIZE AS DIFFUSER 04/24/2020 NECK UNLESS NOTED OTHERWISE. LU H. ROUND TAKE -OFF FITTINGS FROM RECTANGULAR 0 DUCTWORK SHALL BE MADE WITH BUCKLEY BELLMOUTH FITTINGS, OR APPROVED EQUAL. J I. PROVIDE TURNING VANES IN ALL ELBOWS. J. THERMOSTATS SHALL BE SUPPLIED BY THE HVAC CONTRACTOR. THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL THE NECESSARY CONDUIT, WIRE, BOXES, ETC. FOR THE INSTALLATION OF THERMOSTATS. COIL IN GYM AND EXTEND RETURN AIR DUCT SO RETURN THE HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR (D THE INSTALLATION AND CONNECTION OF THERMOSTATS. GRILLES ARE IN LOWER EXERCISE ROOM 112. PLAN HEX NOTES: O 1 MAINTAIN A MINIMUM OF 10'-0" CLEARANCE BETWEEN OUTSIDE AIR INTAKE OF EXISTING RTU AND ANY NEW EXHAUST FANS, PLUMBING VENTS, ETC. 2 EXISTING SUPPLY AND RETURN DUCT MAINS FROM EX-RTU1. 0 3 PROVIDE AND INSTALL FURNACE WITH COOLING COIL ON TOP AND ECONOMIZER BELOW. PROVIDE MANUFACTURER RECOMMENDED MAINTENANCE CLEARANCES. OUTDOOR AIR INTAKE DUCT THROUGH THE SIDE WALL AND TERMINATE WITH ^ AN INTAKE LOUVER. ROUTE FLUE UP THROUGH THE ROOF AND IV OFFSET SUCH THAT IT IS NOT WITHIN 10' OF ANY OUTDOOR AIR INTAKE. PROVIDE LITTLE GIANT OR SIMILAR CONDENSATE PUMP AND CONNECT CONDENSATE DRAIN TO NEAREST SINK/ LAVATORY TRAP. 4 PROVIDE AND INSTALL CONDENSING UNIT. PROVIDE MANUFACTURER RECOMMENDED MAINTENANCE CLEARANCES. 5 REFRIGERANT PIPING SHOWN FOR GENERAL ROUTING PURPOSES. CONTRACTOR TO COORDINATE WITH REFRIGERANT SYSTEM MANUFACTURER FOR COMPLETE AND OPERATING SYSTEM. EACH LINE REPRESENTS 2 OR 3 PIPES AS INDICATED BY MANUFACTURER. 6 PROVIDE TEMPERATURE SENSOR TO AVERAGE OUT TEMPERATURE INPUT FOR EX-RTU1. 7 PROVIDE DRYER DUCT BOX IPS CORPORATION MODEL DB4D OR SIMILAR AND RUN FULL SIZE DRYER EXHAUST DUCT THROUGH ROOF AND TERMINATE WITH DRYERJACK DJK466 ROOF VENT. 8 PROVIDE AND INSTALL CEILING EXHAUST FAN. ROUTE EXHAUST DUCT UP THROUGH ROOF AND TERMINATE WITH GOOSENECK DUCT AND INSECT SCREEN. 9 PROVIDE AND INSTALL FURNACE WITH COOLING COIL ON TOP AND ECONOMIZER BELOW. PROVIDE MANUFACTURER RECOMMENDED MAINTENANCE CLEARANCES. OUTDOOR AIR INTAKE DUCT UP THROUGH THE ROOF AND TERMINATE WITH A GOOSENECK DUCT AND INSECT SCREEN. ROUTE FLUE THROUGH THE SIDE WALL OR UP THROUGH THE ROOF AND OFFSET SUCH THAT IT IS NOT WITHIN 10' OF ANY OUTDOOR AIR INTAKE. PROVIDE LITTLE GIANT OR SIMILAR CONDENSATE PUMP AND CONNECT CONDENSATE DRAIN TO NEAREST SINK/ LAVATORY TRAP. 10 REFRIGERANT PIPE DOWN AND INTO FURNACE. 11 REFRIGERANT PIPE DOWN AND INTO CONDENSING UNIT. 12 REFRIGERANT PIPE UP AND INTO CONDENSING UNIT. 13 ROUTE OUTDOOR AIR INTAKE DUCT UP AND CONNECT TO INTAKE LOUVER. BOTTOM OF INTAKE LOUVER TO BE A HEIGHT OF 6 FEET FROM THE TOP OF OUTDOOR GRADE. 14 TAP NEW BRANCH DUCT FROM EXISTING EX-RTU1 DUCT MAINS. 15 TURN DUCT DOWN TO SERVE NEW DIFFUSERS AT LAY -IN CEILING HEIGHT. 16 REFRIGERANT PIPE DOWN TO ABOVE CEILING OF MAIN FLOOR. 17 PROVIDE 26"X10" OUTDOOR AIR INTAKE LOUVER (COLOR BY ARCHITECT). 18 PROVIDE 26"X12" OUTDOOR AIR INTAKE LOUVER (COLOR BY ARCHITECT). 19 ROUTE EXHAUST DUCT UP TO ROOF AND TERMINATE WITH ROOF JACK. 20 ROUTE SECTION OF EXHAUST DUCT IN ATTIC. 21 PROVIDE RETURN AIR GRILLE AND DUCT THROUGH WALL. MOUNT GRILLE 6" FROM BOTTOM OF CEILING. 22 PROVIDE RELIEF AIR LOUVER (COLOR BY ARCHITECT) AND DUCT THROUGH WALL. INSTALL LOUVER SO THAT IT IS 12" FROM BOTTOM OF CEILING. TURN DUCT UP FOR SOUND ATTENUATION. PROVIDE RELIEF DAMPER IN THE DUCT AND PROVIDE LOUVER WITH INSECT SCREEN. 23 INSTALL CONDENSING UNIT INSIDE THE EXISTING BOLLARDS AND FENCE. k1irtm engineering consultants CLIENT: THE RTO GROUP DENVER,CO EOR STAMP PROJECT: K O J W 0 O LU W H J U LaL G LU 0 LJ. 0 ` W LU0 0 C0 G ISSUANCE: PERMIT SET REVISIONS: # DATE 0 CHECKED BY: 0 04/24/2020 LJ. LU LU 0 Lu MB J JC/)U O 25 RELOCATE EXISTING RETURN AIR GRILLES SERVING BLOWER W LuLU COIL IN GYM AND EXTEND RETURN AIR DUCT SO RETURN (D GRILLES ARE IN LOWER EXERCISE ROOM 112. O Q W 0 M LLu 2 ISSUANCE: PERMIT SET REVISIONS: # DATE DESCRIPTION CHECKED BY: NOT USED 04/24/2020 REVISIONS 06/11/2020 REVISIONS DATE: 12/30/2019 PROJECT NUMBER: 19. RT0.003 R HVAC PLAN - REVISION IMPROVEMENT City of Wheat Ridge Building Division SHEET NO: O M201 DRAWN BY: CHECKED BY: 24 RELOCATE EXISTING EXHAUST DIFFUSER AS PER IMPROVEMENT PLANS. EXTEND EXHAUST AIR DUCT TO NEW BH MB LOCATION AND BALANCE EXHAUST DIFFUSER TO 100 CFM. A 25 RELOCATE EXISTING RETURN AIR GRILLES SERVING BLOWER COIL IN GYM AND EXTEND RETURN AIR DUCT SO RETURN SHEET TITLE: GRILLES ARE IN LOWER EXERCISE ROOM 112. R HVAC PLAN - REVISION IMPROVEMENT City of Wheat Ridge Building Division SHEET NO: O M201 O SUPPORTFROM STRUCTURE FLEXIBLE DUCT 5'-0" MAXIMUM LENGTH \ 8 F-11 10 Eel ■ .1:L'1 0 Ee17 D1R" 1 CONTROL VOLUME DAMPER/ FACTORY FABRICATED, RECTANGULAR TO ROUND BRANCH TAKE -OFF WITH DAMPER AS SHOWN EXTERNAL FLEXIBLE DUCTWORK ELBOW- THERMAFLEX FLEXFLOW ELBOW OR APPROVED EQUIVALENT ,CEILING Y DIFFUSER 7 ) CEILING DIFFUSER DETAIL M302 SCALE: NOT TO SCALE V SII 4xDUUM MININI MUM C I I \MITERED ELBOW WITH TURNING VANES RADIUS ELBOW WITH CENTERLINE RADIUS OF 1.5xDUCT WIDTH (INTERIOR MITERED CORNERS ARE NOT ALLOWED) 45° BRANCH I I FACTORY FABRICATED, DUCT FITTING RECTANGULAR TO ROUND BRANCH TAKE -OFF WITH DAMPER AS SHOWN LINED SHEET METAL PLENUM TO FIT DIFFUSER NECK 6 DUCTWORK CONSTRUCTION DETAIL \ML3V SCALE: NOT TO SCALE OUTDOOR AIR DUCT - SIZE PER PLANS, SUPPLY AIR DUCT - TERMINATE WITH GOOSENECK /SIZE PER PLANS COORDINATE DUCTWORK ROUTING WITH EXISTING STRUCTURE CEILING FLEXIBLE CONNECTION (TYP) PVC EXHAUST AND INTAKE LINES -SIZE AND INSTALL PER MANUFACTURER'S RECOMMENDATIONS REFRIGERANT LINES TO ASSOCIATED CONDENSING Il UNIT -SIZE AND INSTALL PER I� MANUFACTURER'S RECOMMENDATIONS - FIELD VERIFY EXACT ROUTING \CASED COIL ADAPTOR (AS REQUIRED) 4q NATURAL GAS PIPING- =URNACE REFER TO PLANS FOR ROUTING AND SIZE SHUT-OFF VALVE ty BALANCE _ 6" DIRT LEG W/THREADED CAP DAMPER UNION CONNECTIN FULL SIZE CONDENSATE DRAIN - ROUTE TO NEAREST SINK/ LAVATORY SLIDE -IN FILTER WITH COUNTER -BALANCED BACKDRAFT DAMPER L` FULL SIZE ECONOMIZER L RETURN OPEN TO ROOM NOTE. OUTDOOR AIR INTAKE DUCT FOR FURNACES IN ELEMENTARY1 & ELEMENTARY2 TO BE THROUGH THE SIDE WALL AND TERMINATED WITH INTAKE LOUVER. 5 FURNACE DETAIL M302 / SCALE: NOT TO SCALE 2 SPIN -IN FLEXIBLE DUCT MAXIMUM 5' GALVANIZED METAL CAP WITH HOOD AT PIPE PENETRATIONS REFRIGERATION LINE PRE -MANUFACTURED CURE FLASHING IIIFYU4\R0P 10"x10" OPENING FOR REFRIGERATION LINES. 3 CONDENSING UNIT WALL MOUNTED DISCONNECT SWITCH ME DAMPER REFRIGERANT PIPING UP ALONG EXTERIOR WALL TO ABOVE CEILING. PENETRATE EXTERIOR WALL ABOVE CEILING AND SLEEVE PENETRATION. SUPPORT PIPING AS REQUIRED PER MANUFACTURER. REFER TO SPECIFICATIONS FOR REFRIGERATION PIPING REQUIREMENTS. PROVIDE ALUMINUM JACKET OR UV RESISTANT WRAP ON ALL EXTERIOR REFRIGERANT PIPING TO PROTECT INSULATION v A SUPPORT REFRIGERANT PIPING AND CONDUIT ABOVE GRADE WITH SEPARATE SUPPORT STRUCTURE PROVIDE NEW CONCRETE HOUSEKEEPING PAD MINIMUM OF 4" ABOVE FINISH GRADE. PROVIDE STRUCTURAL RAILS TO SUPPORT UNIT ABOVE TYPICAL SNOW FALL ELEVATION. TO CONDENSING UNIT NEOPRENE GASKET MOUNT CURB ON TOP OF METAL DECK 4 REFRIGERATION LINE ROOF PENETRATION M302 / SCALE: NOT TO SCALE "GRIPPLE" OR EQUAL TOGGLE FASTENER FOR STEEL DECK, STUD FASTENER FOR CONCRETESTRUCTURE "GRIPPLE" OR EQUAL MANUFACTURED HANGER SYSTEM WITH AIRCRAFT CABLE. SIZE ALL COMPONENTS INCLUDING CABLE PER MFGR'S. DESIGN DATA. SPIRAL DOUBLE----_� WALL DUCT PER SPECIFICATIONS - LOADS MUST BE HUNG WITHIN 3" OF PANEL POINTS REF STRUCTURAL SUPPLY REGISTER, REF FLOOR PLAN FOR SIZE AND LOCATION, MOUNT REGISTERS FACE DOWN AT THE NEW CEILING HEIGHT 3 ROUND DUCT SUPPORT AND GRILLE M302 SCALE: NOT TO SCALE 0 LOUVER SCHEDULE CEILING 1 MANUFACTURER AMBIENT TEMPERATURE MODEL (°F) FACTORY FABRICATED, PLAN MARK RECTANGULAR TO ROUND MODEL BRANCH TAKE -OFF WITH SIZE DAMPER AS SHOWN Y GRILLE MAIN OR BRANCH DUCT/ GALVANIZED METAL CAP WITH HOOD AT PIPE PENETRATIONS REFRIGERATION LINE PRE -MANUFACTURED CURE FLASHING IIIFYU4\R0P 10"x10" OPENING FOR REFRIGERATION LINES. 3 CONDENSING UNIT WALL MOUNTED DISCONNECT SWITCH ME DAMPER REFRIGERANT PIPING UP ALONG EXTERIOR WALL TO ABOVE CEILING. PENETRATE EXTERIOR WALL ABOVE CEILING AND SLEEVE PENETRATION. SUPPORT PIPING AS REQUIRED PER MANUFACTURER. REFER TO SPECIFICATIONS FOR REFRIGERATION PIPING REQUIREMENTS. PROVIDE ALUMINUM JACKET OR UV RESISTANT WRAP ON ALL EXTERIOR REFRIGERANT PIPING TO PROTECT INSULATION v A SUPPORT REFRIGERANT PIPING AND CONDUIT ABOVE GRADE WITH SEPARATE SUPPORT STRUCTURE PROVIDE NEW CONCRETE HOUSEKEEPING PAD MINIMUM OF 4" ABOVE FINISH GRADE. PROVIDE STRUCTURAL RAILS TO SUPPORT UNIT ABOVE TYPICAL SNOW FALL ELEVATION. TO CONDENSING UNIT NEOPRENE GASKET MOUNT CURB ON TOP OF METAL DECK 4 REFRIGERATION LINE ROOF PENETRATION M302 / SCALE: NOT TO SCALE "GRIPPLE" OR EQUAL TOGGLE FASTENER FOR STEEL DECK, STUD FASTENER FOR CONCRETESTRUCTURE "GRIPPLE" OR EQUAL MANUFACTURED HANGER SYSTEM WITH AIRCRAFT CABLE. SIZE ALL COMPONENTS INCLUDING CABLE PER MFGR'S. DESIGN DATA. SPIRAL DOUBLE----_� WALL DUCT PER SPECIFICATIONS - LOADS MUST BE HUNG WITHIN 3" OF PANEL POINTS REF STRUCTURAL SUPPLY REGISTER, REF FLOOR PLAN FOR SIZE AND LOCATION, MOUNT REGISTERS FACE DOWN AT THE NEW CEILING HEIGHT 3 ROUND DUCT SUPPORT AND GRILLE M302 SCALE: NOT TO SCALE 0 LOUVER SCHEDULE CONDENSING UNIT SCHEDULE PLAN MARK MANUFACTURER AMBIENT TEMPERATURE MODEL (°F) D CAPACITY MIN. (MBH) SEER PLAN MARK MANUFACTURER MODEL MATERIAL SIZE FREEAREA MAXIMUM AIRFLOW (CFM) MAX. OP (N WG) BLADE ANGLE NOTES LV1 RUSKIN ELF6375DX ALUMINUM 26'X10" 57% 1600 0.10 37.5° PROVIDE BACKDRAFT DAMPER AND INSECT SCREEN. LV2 RUSKIN ELF6375DX ALUMINUM 26'X12" 57% 2000 0.10 37.5° PROVIDE BACKDRAFT DAMPER AND INSECT SCREEN. LV3 RUSKIN ELF6375DX ALUMINUM 18'X14" 57% 1200 0.10 37.5° PROVIDE RELIEF DAMPER AND INSECT SCREEN. LV4 RUSKIN ELF6375DX ALUMINUM 18'X14" 57% 1200 0.10 37.5° PROVIDE RELIEF DAMPER AND INSECT SCREEN. LV5 RUSKIN ELF6375DX ALUMINUM 18'X14" 57% 1200 0.10 37.5° PROVIDE RELIEF DAMPER AND INSECT SCREEN. LV6 RUSKIN ELF6375DX ALUMINUM 18'X14" 57% 1200 0.10 37.5° PROVIDE RELIEF DAMPER AND INSECT SCREEN. LV7 RUSKIN ELF6375DX ALUMINUM 22'X14" 57% 1600 0.10 37.5° PROVIDE RELIEF DAMPER AND INSECT SCREEN. LV8 RUSKIN ELF6375DX ALUMINUM 24'X16" 57% 2000 1 0.10 1 37.5° 1PROVIDE RELIEF DAMPER AND INSECT SCREEN. NOTE: MAINTAIN CLEARANCE REQUIREMENTS IN FRONT OF DISCONNECT SWITCH PER NATIONAL ELECTRIC CODE. 2 ) GROUND MOUNTED CONDENSING UNIT M302 SCALE: NOT TO SCALE DISCONNECT SWITCH BY E/C FOR EACH 16" MIN. 2" MINIMUM ALL SIDES UNIT. DO NOT MOUNT DISCONNECT SERVICE ALL SIDES SWITCH TO UNIT. SIDE PROVIDE FREE-STANDING B -LINE SUPPORT CONDENSING UNIT. BOLT DOWN STRUCTURE FASTENED DOWN TO CURB TOP. TO PLYWOOD. SEAL BOLT PAINT ALL EXPOSED METAL WITH PENETRATIONS WATERTIGHT WEATHERPROOF PAINT. 18 GA. GALVANIZED METAL THYCURB MODEL TP -1 PIPING BOOT WITH STAINLESS STEELHINSULATION CURB COVER OVER 15# FELT. SECURE TO CURB WITH GALV. GEAR CLAMPS FOR EACH REFRIGERANT LINE AND /SCREWS AT 8" O.C. MAXIMUM ELECTRICAL CONDUIT (INCLUDING CONTROL WIRING) EQUAL BY PATE.2 LAYERS 3/4" EXTERIOR 18 GA. MIN. GALVANIZED��PLYWOOD. SECURE TO CURB SHEET METAL SLEEVE FORGALV. SCREWS AT 8" O.C. MAX. EACH PENETRATION. SEALINSULATED ROOF CURB. FLASH JOINT TO CURB COVER PER ARCHITECTURAL DETAILS WATERTIGHT ,I 18" MINIMUMHHT��ROOF INSULATION ROOF DECK JOIST ROOF MOUNT CONDENSING UNIT DETAIL M302 / SCALE: NOT TO SCALE FAN SCHEDULE CONDENSING UNIT SCHEDULE PLAN MARK MANUFACTURER AMBIENT TEMPERATURE MODEL (°F) D CAPACITY MIN. (MBH) SEER PLAN MARK MANUFACTURER MODEL AIR FLOW (CFM) EST. ESP (IN WG) VOLTAGE PHASE MOTOR(W) NOTES EF1 LOREN COOK GC -146 100 0.1 120 1 29.4 DD,DM,GBD,SC EF2 LOREN COOK GC -146 100 0.1 120 1 29.4 DD,DM,GBD,SC EF3 LOREN COOK GC -146 100 0.1 120 1 29.4 DD,DM,GBD,SC EF4 LOREN COOK GC -146 100 0.1 120 1 29.4 DD,DM,GBD,SC EF5 LOREN COOK GC -146 100 0.1 120 1 29.4 DD,DM,GBD,SC EF6 LOREN COOK GC -146 100 0.1 120 1 29.4 DD,DM,GBD,SC EF7 LOREN COOK GC -128 75 0.1 120 1 23.8 DD,DM,GBD,SC EF8 I LOREN COOK I GC -128 1 75 1 0.1 1 120 1 1 1 23.8 DD,DM,GBD,SC SPLIT SYSTEM CONDENSING UNIT SCHEDULE PLAN MARK MANUFACTURER AMBIENT TEMPERATURE MODEL (°F) D CAPACITY MIN. (MBH) SEER VOLTAGE DATA PHASE FLA MCA MOCP (A) NOTES CU1 LENNOX SSB036H4 92 21.2 15.5 230 3 11.6 16.2 25 CCH,HG CU2 LENNOX SSB036H4 92 30.2 15.5 230 3 11.6 16.2 25 CCH,HG CU3 LENNOX SSB036H4 92 21.3 15.5 230 3 11.6 16.2 25 CCH,CUCB,HG CU4 LENNOX SSB036H4 92 21.6 15.5 230 3 11.6 16.2 25 CCH,CUCB,HG CU5 LENNOX SSB036H4 92 21.7 15.5 230 3 11.6 16.2 25 CCH,CUCB,HG CU6 LENNOX SSB048H4 92 30.4 16 230 3 14 20.3 30 CCH,HG CU7 LENNOX SSB060H4 92 44.4 1 16 1 230 3 1 16.5 22.4 35 lCCH,CUCB,HG GRILLE, REGISTER AND DIFFUSER SCHEDULE PLAN MARK MANUFACTURER MODEL APPLICATION FRAME FINISH TYPE VOLUME DAMPER MAXIMUM MAXIMUMOP NC (IN WG) NOTES RA TITUS OMNI -24 x 24 RETURN BYARCHITECT GRID No 25 0.10 24x24 SQUARE PLAQUE FACE WITH ROUND DUCT CONNECTION RB TITUS 351 -RL RETURN BYARCHITECT SURFACE No 30 0.10 WALL GRILLE- DOUBLE DEFLECTION - ALUMINUM SA TITUS OMNI -12 x 12 SUPPLY BYARCHITECT GRID No 25 0.10 12x12 SQUARE PLAQUE FACE WITH ROUND DUCT CONNECTION SB TITUS OMNI -24 x 24 SUPPLY BYARCHITECT GRID No 25 0.10 24x24 SQUARE PLAQUE FACE WITH ROUND DUCT CONNECTION SC TITUS 301 -RL SUPPLY BYARCHITECT SURFACE Yes 25 0.10 WALL GRILLE- DOUBLE DEFLECTION - ALUMINUM PACKAGED ROOFTOP UNIT SCHEDULE EXISTING, TO REMAIN PLAN MARK MANUFACTURER MODEL SUPPLY AIR FLOW (CFM) EST. ESP (IN WG) OUTDOOR AIR FLOW COOLING CAPACITY GAS HEATING ELECTRICAL DATA MAX (CFM) MIN (CFM) E.AT. DB (°F) E.AT. WB (°F) MIN. SHC (BTU/H) MIN. THC (BTU/H) GAS LOAD (BTU/H) OUTPUT (BTU/H) EFFICIENCY (%) VOLTAGE PHASE FLA MCA -77 EX-RTU1 LENNOX LGA120SHlY 4,000 1 700 655 92 62 110,000 120,000 130,000 104,000 80 230 3 42 53 96 SPLIT SYSTEM FURNACE SCHEDULE A AMPS CAP CAPACITY CFM CUBIC FEET PER MINUTE DB DRYBULB E.A.T. ENTERING AIR TEMPERATURE PLAN MARK MANUFACTURER MODEL OUTDOOR AIRFLOW (CFM) SUPPLY FAN SUPPLY AIRFLOW MOTOR (CFM) (HP) EST.ESP (IN WG) E.AT. DB (°F) COOLING DATA E.AT. WB MIN SHC (°F) (BTU/H) MIN THC (BTU/H) GAS HEATING GAS LOAD OUTPUT EFFICIENCY (BTU/H) (BTU/H) N VOLTAGE ELECTRICAL DATA PHASE FLA MCA MOCP (A) NOTES F1 LENNOX EL296UH070XV36B 160 1,200 0.5 0.5 92 62 33,000 36,000 66,000 62,000 L.W.T. 96 120 1 7.7 9.7 15 CP,T, ECONOMIZER, COIL:CX34-36B-6F F2 LENNOX EL296UH070XV36B 410 1,200 0.5 0.5 92 62 33,000 36,000 66,000 62,000 POUNDS PER HOUR 96 120 1 7.7 9.7 15 CP,T, ECONOMIZER, COIL:CX34-36B-6F F3 LENNOX EL296UH070XV36B 135 1,200 0.5 0.5 92 62 33,000 36,000 66,000 62,000 BELT DRIVE MOTOR 96 120 1 7.7 9.7 15 CP,T, ECONOMIZER, COIL:CX34-36B-6F F4 LENNOX EL296UH070XV36B 135 1,200 0.5 0.5 92 62 33,000 36,000 66,000 62,000 LOW AMBIENT COOLING CONTROLS CAPABLE OF OPERATING IN COOLING MODE DOWN TO 0°F 96 120 1 7.7 9.7 15 CP,T, ECONOMIZER, COIL:CX34-36B-6F F5 LENNOX EL296UH070XV36B 265 1,200 0.5 0.5 92 62 33,000 36,000 66,000 62,000 96 120 1 7.7 9.7 15 CP,T, ECONOMIZER, COIL:CX34-36B-6F F6 LENNOX EL296UH09OXV48C 400 1,600 0.75 0.5 92 62 44,000 48,000 88,000 85,000 96 120 1 10.1 12.7 15 CP,T, ECONOMIZER, COIL:CX34-49C-6F F7 LENNOX EL296UH11OXV60C 410 2,000 1 0.5 92 62 55,000 60,000 110,000 106,000 96 120 1 12.8 16.0 20 CP,T, ECONOMIZER,COILCX34-62C-6F 1 2 3 4 5 5 C k1irtm engineering consultants CLIENT: THE RTO GROUP DENVER,CO EOR STAMP PROJECT: K O ILLJ W 0 O LU W Of H J U LLL G LLJ 0 U �< LJ. `0 Lli VJ 0 0 0 C G SCHEDULE LEGEND ABBREVIATED SCHEDULE A AMPS CAP CAPACITY CFM CUBIC FEET PER MINUTE DB DRYBULB E.A.T. ENTERING AIR TEMPERATURE E.S.P. EXTERNAL STATIC PRESSURE INCLUDES ALL WORK EXTERNAL TO UNIT E.W.T. ENTERING WATER TEMPERATURE EER ENERGY EFFICIENCY RATIO EST. ESTIMATED FLA FULL LOAD AMPS FPM FEET PER MINUTE GPH GALLONS PER HOUR GPM GALLONS PER MINUTE GR/LB GRAINS OF MOISTURE PER POUND OF DRYAIR HP HORSEPOWER IN INCH ISP INLET STATIC PRESSURE L.A.T. LEAVING AIR TEMPERATURE L.W.T. LEAVING WATER TEMPERATURE LBS POUNDS LOAD NOMINAL CONNECTED GAS LOAD TO UNIT, USED TO SIZE GAS PIPING MCA MINIMUM CIRCUIT AMPACITY MIN. MINIMUM MOCP MAXIMUM OVERCURRENT PROTECTION NC MAXIMUM NOISE CRITERIA RATING NPSH NET PRESSURE SUCTION HEAD OA OUTSIDEAIR OUTPUT MINIMUM REQUIRED OUTPUT TO SATIFY SCHEDULED HEATING REQUIREMENTS PPH POUNDS PER HOUR PSI POUNDS PER SQUARE INCH RPM REVOLUTIONS PER MINUTE SEER SEASONAL ENERGY EFFICIENCY RATIO SHC SENSIBLE HEAT CAPACITY TEMP. TEMPERATURE THC TOTAL HEAT CAPACITY WB WET BULB WPD WATER PRESSURE DROP EXHAUST FAN SCHEDULE AF ALUMINUM FINISH BD BELT DRIVE MOTOR DD DIRECT DRIVE MOTOR DM DISCONNECT MEANS EPC INDUSTRIAL STRENGTH EPDXY POWDER COAT FOR ALL PARTS EXPOSED TO AIR STREAM GBD GRAVITY BACKDRAFT DAMPER SC SPEED CONTROLLER SPLIT SYSTEM SCHEDULE CCH CRANKCASE HEATER CP CONDENSATE PUMP CUCB PROVIDE CURB FOR MOUNTING OF CONDENSING UNIT HG HAIL GAURDS FOR CONDENSOR COILS LAO LOW AMBIENT COOLING CONTROLS CAPABLE OF OPERATING IN COOLING MODE DOWN TO 0°F T PROGRAMMABLE AUTO -CHANGEOVER THERMOSTAT UNIT HEATER SCHEDULE FS HEATER AIR FLOW SWITCH IDS INTEGRAL DISCONNECTING MEANS MC MAGNETIC CONTACTOR RMK RECESS MOUNTING KIT WITH INTEGRAL INLET AND OUTLET GRILLES SMK SURFACE MOUNTING KIT WITH INTEGRAL INLET AND OUTLET GRILLES T INTEGRAL THERMOSTAT REVISION City of Wheat Ridge Building Division 5 C k1irtm engineering consultants CLIENT: THE RTO GROUP DENVER,CO EOR STAMP PROJECT: K O ILLJ W 0 O LU W Of H J U LLL G LLJ 0 U �< LJ. `0 Lli VJ 0 0 0 C G ISSUANCE: B PERMIT SET REVISIONS: # DATE 0 zt NOT USED 04/24/2020 LJ_ W Lli 0 w J JI;jU O i LIJ ��W1'� `J 0 Q J O0 08 M W 2 ISSUANCE: B PERMIT SET REVISIONS: # DATE DESCRIPTION zt NOT USED 04/24/2020 REVISIONS 06/11/2020 REVISIONS DATE: 12/30/2019 PROJECT NUMBER: 19. RT0.003 DRAWN BY: CHECKED BY: BH MB A SHEET TITLE: MECHANICAL DETAILS & SCHEDULES SHEET NO: M302 w c z N c 0 0 0) c L N c .0) c N I 0 1 15A: HEATING, VENTILATING, AND AIR CONDITIONING 15A1 GENERAL INSTRUCTIONS 15A1-1 GENERAL REQUIREMENTS REQUIREMENTS UNDER DIVISION ONE AND THE GENERAL AND SUPPLEMENTARY CONDITIONS OF THESE SPECIFICATIONS SHALL BE A PART OF THIS SECTION. CONTRACTOR SHALL BECOME THOROUGHLY ACQUAINTED WITH ITS CONTENTS AS TO REQUIREMENTS THAT AFFECT THIS DIVISION OR SECTION. THE WORK REQUIRED UNDER THIS SECTION INCLUDES MATERIAL, EQUIPMENT, APPLIANCES, TRANSPORTATION, SERVICES, AND LABOR REQUIRED TO COMPLETE THE ENTIRE SYSTEM AS REQUIRED BY THE DRAWINGS AND SPECIFICATIONS. THE SPECIFICATIONS AND DRAWINGS FOR THE PROJECT ARE COMPLEMENTARY, AND PORTIONS OF THE WORK DESCRIBED IN ONE SHALL BE PROVIDED AS IF DESCRIBED IN BOTH. IN THE EVENT OF DISCREPANCIES, NOTIFY THE ENGINEER AND REQUEST CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK INVOLVED. WT-11CM9]gy101111R0PF: FURNISH: THE TERM "FURNISH" IS USED TO MEAN "SUPPLY AND DELIVER TO THE PROJECT nSITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION AND SIMILAR OPERATIONS." INSTALL: THE TERM "INSTALL" IS USED TO DESCRIBE OPERATIONS AT THE PROJECT SITE INCLUDING THE ACTUAL "UNLOADING, UNPACKING, ASSEMBLY, ERECTION, PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTING, CLEANING, AND SIMILAR OPERATIONS." PROVIDE: THE TERM "PROVIDE" MEANS "TO FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE." FURNISHED BY OWNER OR FURNISHED BY OTHERS: THE ITEM WILL BE FURNISHED BY THE OWNER OR OTHERS. IT IS TO BE INSTALLED AND CONNECTED UNDER THE REQUIREMENTS OF THIS DIVISION COMPLETE AND READY FOR OPERATION INCLUDING ITEMS INCIDENTAL TO THE WORK INCLUDING SERVICES NECESSARY FOR PROPER INSTALLATION AND OPERATION. THE INSTALLATION SHALL BE INCLUDED UNDER THE GUARANTEE REQUIRED BY THIS DIVISION. ENGINEER: WHERE REFERENCED IN THIS DIVISION, "ENGINEER" IS THE ENGINEER OF RECORD AND THE DESIGN PROFESSIONAL FOR THE WORK UNDER THIS DIVISION, AND IS ACONSULTANT TO AND AN AUTHORIZED REPRESENTATIVE OF THE ARCHITECT AS DEFINED IN THE GENERAL AND/OR SUPPLEMENTARY CONDITIONS. WHEN USED IN THIS DIVISION, IT MEANS INCREASED INVOLVEMENT BY, AND OBLIGATIONS TO, THE ENGINEER, IN ADDITION TO INVOLVEMENT BY, AND OBLIGATIONS TO, THE "ARCHITECT". AHJ: THE LOCAL CODE AND/OR INSPECTION AGENCY AUTHORITY HAVING JURISDICTION OVER THE WORK. THE TERMS "APPROVED EQUAL", "EQUIVALENT", OR "EQUAL" ARE USED SYNONYMOUSLY AND SHALL MEAN "ACCEPTED BY OR ACCEPTABLE TO THE ENGINEER AS EQUIVALENT TO THE ITEM OR MANUFACTURER SPECIFIED". THE TERM "APPROVED" SHALL MEAN LABELED, LISTED, OR BOTH, BY A NATIONALLY RECOGNIZED TESTING LABORATORY (E.G. UL, ETL, CSA), AND ACCEPTABLE TO THE AHJ OVER THIS PROJECT. 15A1-3 PREBID SITE VISIT PRIOR TO SUBMITTING BID, VISIT THE SITE OF THE PROPOSED WORK AND BECOME FULLY INFORMED AS TO THE CONDITIONS UNDER WHICH THE WORK IS TO BE DONE. FAILURE TO DO SO WILL NOT BE CONSIDERED SUFFICIENT JUSTIFICATION TO REQUEST OR OBTAIN EXTRA COMPENSATION OVER AND ABOVE THE CONTRACT PRICE. COORDINATE SITE VISIT WITH ARCHITECT & BUILDING OWNER. i&I-IIClNrGtlq 7rGwG]oI.Dirc.] 79NrGn69:11- PROVIDE NEW MATERIAL, EQUIPMENT, AND APPARATUS UNDER THIS CONTRACT UNLESS OTHERWISE STATED HEREIN, OF BEST QUALITY NORMALLY USED FOR THE PURPOSE IN C GOOD COMMERCIAL PRACTICE, AND FREE FROM DEFECTS. MODEL NUMBERS LISTED IN THE SPECIFICATIONS OR SHOWN ON THE DRAWINGS ARE NOT NECESSARILY INTENDED TO DESIGNATE THE REQUIRED TRIM, WRITTEN DESCRIPTIONS OF THE TRIM GOVERN MODEL NUMBERS. CONTRACTOR RESPONSIBLE FOR NOTIFYING ENGINEER OF ANY DISCREPENCIES. PIPE, PIPE FITTINGS, PIPE SPECIALTIES AND VALVES SHALL BE MANUFACTURED IN PLANTS LOCATED IN THE UNITED STATES. WORK PERFORMED UNDER THIS CONTRACT SHALL PROVIDE A NEAT AND "WORKMANLIKE" APPEARANCE WHEN COMPLETED, TO THE SATISFACTION OF THE ARCHITECT AND ENGINEER. WORKMANSHIP SHALL BE THE FINEST POSSIBLE BY EXPERIENCED MECHANICS. INSTALLATIONS SHALL COMPLY WITH APPLICABLE CODES AND LAWS. THE COMPLETE INSTALLATION SHALL FUNCTION AS DESIGNED AND INTENDED WITH RESPECT TO EFFICIENCY, CAPACITY, NOISE LEVEL, ETC. ABNORMAL NOISE CAUSED BY RATTLING EQUIPMENT, PIPING, DUCTS, AIR DEVICES, AND SQUEAKS IN ROTATING COMPONENTS WILL NOT BE ACCEPTABLE. IN GENERAL, MATERIALS AND EQUIPMENT SHALL BE OF COMMERCIAL SPECIFICATION GRADE IN QUALITY. LIGHT DUTYAND RESIDENTIAL TYPE EQUIPMENT WILL NOT BE ACCEPTED. REMOVE FROM THE PREMISES WASTE MATERIAL PRESENT ASA RESULT OF WORK, INCLUDING CARTONS, CRATING, PAPER, STICKERS, AND/OR EXCAVATION MATERIAL NOT USED IN BACKFILLING, ETC. CLEAN EQUIPMENT INSTALLED UNDER THIS CONTRACT TO PRESENT A NEAT AND CLEAN INSTALLATION AT THE TERMINATION OF THE WORK. REPAIR OR REPLACE PUBLIC AND PRIVATE PROPERTY DAMAGED AS A RESULT OF WORK PERFORMED UNDER THIS CONTRACT TO THE SATISFACTION OF AUTHORITIES AND REGULATIONS HAVING JURISDICTION. 15A1-5 COORDINATION COORDINATE WORK WITH THAT OF OTHER TRADES SO THAT THE VARIOUS COMPONENTS OF THE SYSTEMS WILL BE INSTALLED AT THE PROPER TIME, WILL FIT THE AVAILABLE SPACE, AND WILL ALLOW PROPER SERVICE ACCESS TO THOSE ITEMS REQUIRING MAINTENANCE. COMPONENTS WHICH ARE INSTALLED WITHOUT REGARD TO THE ABOVE SHALL BE RELOCATED AT NO ADDITIONAL COST TO THE OWNER. UNLESS OTHERWISE INDICATED, THE GENERAL CONTRACTOR WILL PROVIDE CHASES AND OPENINGS IN BUILDING CONSTRUCTION REQUIRED FOR INSTALLATION OF THE SYSTEMS SPECIFIED HEREIN. CONTRACTOR SHALL FURNISH THE GENERAL CONTRACTOR WITH INFORMATION WHERE CHASES AND OPENINGS ARE REQUIRED. KEEP INFORMED AS TO THE WORK OF OTHER TRADES ENGAGED IN THE CONSTRUCTION OF THE PROJECT, BAND EXECUTE WORK IN A MANNER AS TO NOT INTERFERE WITH OR DELAY THE WORK OF OTHER TRADES. FIGURED DIMENSIONS SHALL BE TAKEN IN PREFERENCE TO SCALE DIMENSIONS. CONTRACTOR SHALL TAKE HIS OWN MEASUREMENTS AT THE BUILDING, AS VARIATIONS MAY OCCUR. CONTRACTOR WILL BE HELD RESPONSIBLE FOR ERRORS THAT COULD HAVE BEEN AVOIDED BY PROPER CHECKING AND INSPECTION. PROVIDE MATERIALS WITH TRIM THAT WILL PROPERLY FIT THE TYPES OF CEILING WALL OR FLOOR FINISHES ACTUALLY INSTALLED. MODEL NUMBERS LISTED IN THE SPECIFICATIONS OR SHOWN ON THE DRAWINGS ARE NOT INTENDED TO DESIGNATE THE REQUIRED TRIM. iW-11 WK01.4QI0E-110 163:&FG101owi]97:10 WORK PERFORMED UNDER THIS CONTRACT SHALL, AT A MINIMUM, BE IN CONFORMANCE WITH 2012 INTERNATIONAL SERIES OF CODES AND LOCAL CODES HAVING JURISDICTION. EQUIPMENT FURNISHED AND ASSOCIATED INSTALLATION WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN STRICT COMPLIANCE WITH CURRENT APPLICABLE CODES ADOPTED BY THE LOCAL AHJ INCLUDING ANY AMENDMENTS AND STANDARDS AS SET FORTH BY THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), UNDERWRITERS LABORATORIES (UL), OCCUPATIONAL SAFETYAND HEALTH ADMINISTRATION (OSHA), AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS (ASHRAE), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AMERICAN SOCIETY OF TESTING MATERIALS (ASTM) AND OTHER NATIONAL STANDARDS AND CODES WHERE APPLICABLE. WHERE THE CONTRACT DOCUMENTS EXCEED THE REQUIREMENTS OF THE REFERENCED CODES, STANDARDS, ETC., THE CONTRACT DOCUMENTS SHALL TAKE PRECEDENCE. PROCURE AND PAY FOR PERMITS AND LICENSES REQUIRED FOR THE ACCOMPLISHMENT OF THE WORK HEREIN DESCRIBED. WHERE REQUIRED, OBTAIN, PAY FOR AND FURNISH CERTIFICATES OF INSPECTION TO OWNER. CONTRACTOR WILL BE HELD RESPONSIBLE FOR VIOLATIONS OF THE LAW. 15A1-7 PROTECTION OF EQUIPMENTAND MATERIALS STORE AND PROTECT FROM DAMAGE EQUIPMENTAND MATERIALS DELIVERED TO JOB SITE. COVER WITH WATERPROOF, TEAR -RESISTANT, HEAVY TARP OR POLYETHYLENE PLASTIC AS REQUIRED TO PROTECT FROM PLASTER, DIRT, PAINT, WATER, OR PHYSICAL DAMAGE. EQUIPMENT AND MATERIAL THAT HAS BEEN DAMAGED BY CONSTRUCTION ACTIVITIES WILL BE REJECTED, AND CONTRACTOR IS OBLIGATED TO FURNISH NEW EQUIPMENT AND MATERIAL OF A LIKE KIND. KEEP PREMISES BROOM CLEAN FROM FOREIGN MATERIAL CREATED DURING WORK APERFORMED UNDER THIS CONTRACT. PIPING, EQUIPMENT, ETC. SHALL HAVE A NEAT AND CLEAN APPEARANCE AT THE TERMINATION OF THE WORK. PLUG OR CAP OPEN ENDS OF DUCTWORK AND PIPING SYSTEMS WHILE STORED AND INSTALLED DURING CONSTRUCTION WHEN NOT IN USE TO PREVENT THE ENTRANCE OF DEBRIS INTO THE SYSTEMS. 1 � 2 � 3 � 4 � 5 15A1-8 SUBSTITUTIONS THE BASE BID SHALL INCLUDE ONLY THE PRODUCTS FROM MANUFACTURERS SPECIFICALLY NAMED IN THE DRAWINGS AND SPECIFICATIONS. NO SUBSTITUTION WILL BE CONSIDERED PRIOR TO RECEIPT OF BIDS UNLESS WRITTEN REQUEST FOR APPROVAL TO BID HAS BEEN RECEIVED BY THE ENGINEER AT LEAST TEN CALENDAR DAYS PRIOR TO THE DATE FOR RECEIPT OF BIDS. EACH SUCH REQUEST SHALL INCLUDE THE NAME OF THE MATERIAL OR EQUIPMENT FOR WHICH IT IS TO BE SUBSTITUTED AND A COMPLETE DESCRIPTION OF THE PROPOSED SUBSTITUTE INCLUDING DRAWINGS, CUTS, PERFORMANCE AND TEST DATAAND OTHER INFORMATION NECESSARY FOR AN EVALUATION. A STATEMENT SETTING FORTH CHANGES IN OTHER MATERIALS, EQUIPMENT OR OTHER WORK THAT INCORPORATION OF THE SUBSTITUTE WOULD REQUIRE SHALL BE INCLUDED. THE BURDEN OF PROOF OF THE MERIT OF THE PROPOSED SUBSTITUTE IS UPON THE PROPOSER. THE ENGINEER'S DECISION OF APPROVAL OR DISAPPROVAL TO BID OF A PROPOSED SUBSTITUTION SHALL BE FINAL. THE TERMS "APPROVED", "APPROVED EQUAL", AND "EQUAL" REFER TO APPROVAL BY THE ENGINEER AS AN ACCEPTABLE ALTERNATE BID. NO SUBSTITUTIONS WILL BE CONSIDERED THAT ARE NOT BID AS AN ALTERNATE. NO MATERIAL SUBSTITUTIONS SHALL BE CONSIDERED FOR APPROVAL PRIOR TO AWARD OF CONTRACT. COORDINATE AND VERIFY WITH OTHER TRADES WHETHER OR NOT THE SUBSTITUTED EQUIPMENT CAN BE INSTALLED AS SHOWN ON THE CONSTRUCTION DRAWINGS WITHOUT MODIFICATION TO ASSOCIATED SYSTEMS OR ARCHITECTURAL OR ENGINEERING DESIGN. INCLUDE ADDITIONAL COSTS FOR ARCHITECTURAL AND ENGINEERING DESIGN FEES IN BID IF DRAWING MODIFICATIONS ARE REQUIRED BECAUSE OF SUBSTITUTED EQUIPMENT. 15A1-9 SHOP DRAWINGS UPON BEING AWARDED A CONTRACT, SUBMIT TO THE ARCHITECT FOR APPROVAL, ONE (1) COPY OF MANUFACTURER'S SHOP DRAWINGS FOR EQUIPMENT TO BE FURNISHED UNDER THIS CONTRACT, ITEMS REQUIRING COORDINATION BETWEEN CONTRACTORS AND SHEET METAL DUCTWORK FABRICATION DRAWINGS. BEFORE SUBMITTING SHOP DRAWINGS AND MATERIAL LISTS, VERIFY THAT EQUIPMENT SUBMITTED IS MUTUALLY COMPATIBLE AND SUITABLE FOR THE INTENDED USE, AND WILL FIT THE AVAILABLE SPACE AND ALLOW AMPLE ROOM FOR MAINTENANCE. HIGHLIGHT, MARK, LIST OR INDICATE THE MATERIALS, PERFORMANCE CRITERIA AND ACCESSORIES THAT ARE BEING PROPOSED. SUBMIT SHOP DRAWINGS AS EARLY AS REQUIRED TO SUPPORT THE PROJECT SCHEDULE. ALLOW FOR TWO WEEKS ENGINEER REVIEW TIME PLUS MAILING TIME PLUS A DUPLICATION OF THIS TIME FOR RESUBMITTAL IF REQUIRED. SUBMITTALS AND SHOP DRAWINGS SHALL NOT CONTAIN RTM'S FIRM NAME OR LOGO, NOR SHALL IT CONTAIN THE RTM'S ENGINEERS' SEAL AND SIGNATURE. THEY SHALL NOT BE COPIES OF RTM'S WORK PRODUCT. IF THE CONTRACTOR DESIRES TO USE ELEMENTS OF SUCH PRODUCT, REFER TO PARAGRAPH "ELECTRONIC DRAWING FILES" FOR PROCEDURES TO BE USED. THE ENGINEER'S CHECKING AND SUBSEQUENT APPROVAL OF SUCH SHOP DRAWINGS WILL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR ERRORS IN DIMENSIONS DETAILS SIZE OF MEMBERS QUANTITIES OMISSIONS OF COMPONENTS OR FITTINGS; COORDINATION OF ELECTRICAL REQUIREMENTS; OR FOR COORDINATING ITEMS WITH ACTUAL BUILDING CONDITIONS. PROCEED WITH THE PROCUREMENT AND INSTALLATION OF EQUIPMENT ONLY AFTER RECEIVING APPROVED SHOP DRAWINGS RELATIVE TO EACH ITEM. CATALOG DATA SHALL BE PROPERLY BOUND, IDENTIFIED, INDEXED AND TABBED INA 3 -RING BINDER. LABEL THE CATALOG DATA WITH THE EQUIPMENT IDENTIFICATION ACRONYM OR NUMBER AS USED ON THE DRAWINGS AND INCLUDE PERFORMANCE CURVES, CAPACITIES, SIZES, WEIGHTS, MATERIALS, FINISHES, WIRING DIAGRAMS, ELECTRICAL REQUIREMENTS AND DEVIATIONS FROM SPECIFIED EQUIPMENT OR MATERIALS. FOR EQUIPMENT WITH MOTOR STARTERS OR VFDS, INCLUDE SHORT CIRCUIT CURRENT RATINGS. MARK OUT INAPPLICABLE ITEMS. SHOP DRAWINGS WILL BE RETURNED WITHOUT REVIEW IF THE ABOVE MENTIONED REQUIREMENTS ARE NOT MET. REFER TO DIVISION 1 FOR ACCEPTANCE OF ELECTRONIC SUBMITTALS FOR THIS PROJECT. FOR ELECTRONIC SUBMITTALS, CONTRACTOR SHALL SUBMIT THE DOCUMENTS IN ACCORDANCE WITH THE PROCEDURES SPECIFIED IN DIVISION 1. CONTRACTOR SHALL NOTIFY THE ARCHITECT AND ENGINEER THAT THE SHOP DRAWINGS HAVE BEEN POSTED. IF ELECTRONIC SUBMITTAL PROCEDURES ARE NOT DEFINED IN DIVISION 1 CONTRACTOR SHALL INCLUDE THE WEBSITE, USER NAME AND PASSWORD INFORMATION NEEDED TO ACCESS THE SUBMITTALS. FOR SUBMITTALS SENT BY E-MAIL CONTRACTOR SHALL COPY THE ARCHITECT AND ENGINEER'S DESIGNATED REPRESENTATIVES. CONTRACTOR SHALL ALLOW THE ENGINEER REVIEW TIME AS SPECIFIED ABOVE IN THE CONSTRUCTION SCHEDULE. CONTRACTOR SHALL SUBMIT ONLY THE DOCUMENTS REQUIRED TO PURCHASE THE MATERIALS AND/OR EQUIPMENT IN THE ELECTRONIC SUBMITTAL AND SHALL CLEARLY INDICATE THE MATERIALS, PERFORMANCE CRITERIA AND ACCESSORIES BEING PROPOSED. GENERAL PRODUCT CATALOG DATA NOT SPECIFICALLY NOTED TO BE PART OF THE SPECIFIED PRODUCT WILL BE REJECTED AND RETURNED WITHOUT REVIEW. 15A1-10 ELECTRONIC DRAWING FILES IN PREPARATION OF SHOP DRAWINGS OR RECORD DRAWINGS, CONTRACTOR MAY, AT HIS OPTION, OBTAIN ELECTRONIC DRAWING FILES IN AUTOCAD OR DXF FORMAT ON CD-ROM DISK, DVD DISK, FLASH DRIVE OR DIRECT DOWNLOAD, AS DESIRED, FROM THE ENGINEER FOR A SHIPPING AND HANDLING FEE OF $200 FOR A DRAWING SET UP TO 12 SHEETS AND $15 PER SHEET FOR EACH ADDITIONAL SHEET. CONTRACTOR SHALL CONTACT THE ARCHITECT FOR WRITTEN AUTHORIZATION AND ENGINEER FOR THE NECESSARY RELEASE AGREEMENT FORM AND TO SPECIFY SHIPPING METHOD AND DRAWING FORMAT. IN ADDITION TO PAYMENT, ARCHITECT'S WRITTEN AUTHORIZATION AND ENGINEER'S RELEASE AGREEMENT FORM MUST BE RECEIVED BEFORE ELECTRONIC DRAWING FILES WILL BE SENT. 15A1-11 OPERATION AND MAINTENANCE INSTRUCTIONS DURING THE COURSE OF CONSTRUCTION, COLLECT AND COMPILE A COMPLETE BROCHURE OF EQUIPMENT FURNISHED AND INSTALLED ON THIS PROJECT. INCLUDE OPERATIONAL AND MAINTENANCE INSTRUCTIONS, MANUFACTURER'S CATALOG SHEETS, WIRING DIAGRAMS, PARTS LISTS, APPROVED SHOP DRAWINGS, AND DESCRIPTIVE LITERATURE AS FURNISHED BY THE EQUIPMENT MANUFACTURER. INCLUDE AN INSIDE COVER SHEET THAT LISTS THE PROJECT NAME, DATE, OWNER, ARCHITECT, CONSULTING ENGINEER, GENERAL CONTRACTOR, SUB -CONTRACTOR, AND AN INDEX OF CONTENTS. SUBMIT THREE COPIES OF LITERATURE BOUND IN APPROVED BINDERS WITH INDEX AND TABS SEPARATING EQUIPMENT TYPES TO THE ARCHITECT AT THE TERMINATION OF THE WORK. PAPER CLIPS, STAPLES, RUBBER BANDS, AND MAILING ENVELOPES ARE NOT CONSIDERED APPROVED BINDERS. FINAL APPROVAL OF MECHANICAL SYSTEMS INSTALLED UNDER THIS CONTRACT WILL BE WITHHELD UNTIL THIS EQUIPMENT BROCHURE IS RECEIVED AND DEEMED COMPLETE BY THE ARCHITECT AND ENGINEER. INSTRUCT WORKMEN TO SAVE REQUIRED LITERATURE SHIPPED WITH THE EQUIPMENT ITSELF, FOR INCLUSION IN THIS BROCHURE. PROVIDE "AS -BUILT" DRAWINGS (SEE DIVISION 1 AND GENERAL CONDITIONS). 15A1-12 TRAINING AT A TIME MUTUALLY AGREED UPON BETWEEN THE OWNER AND CONTRACTOR, PROVIDE THE SERVICES OF A FACTORY TRAINED AND AUTHORIZED REPRESENTATIVE TO TRAIN OWNER'S DESIGNATED PERSONNEL ON THE OPERATION AND MAINTENANCE OF THE EQUIPMENT PROVIDED FOR THIS PROJECT. PROVIDE TRAINING TO INCLUDE BUT NOT BE LIMITED TO AN OVERVIEW OF THE SYSTEM AND/OR EQUIPMENTAS IT RELATES TO THE FACILITY AS A WHOLE; OPERATION AND MAINTENANCE PROCEDURES AND SCHEDULES RELATED TO STARTUP AND SHUTDOWN, TROUBLESHOOTING, SERVICING, PREVENTIVE MAINTENANCE AND APPROPRIATE OPERATOR INTERVENTION; AND REVIEW OF DATA INCLUDED IN THE OPERATION AND MAINTENANCE MANUALS. SUBMIT A CERTIFICATION LETTER TO THE ARCHITECT STATING THAT THE OWNER'S DESIGNATED REPRESENTATIVE HAS BEEN TRAINED AS SPECIFIED HEREIN. LETTER SHALL INCLUDE DATE, TIME, ATTENDEES AND SUBJECT OF TRAINING. THE CONTRACTOR AND THE OWNER'S REPRESENTATIVE SHALL SIGN THE CERTIFICATION LETTER INDICATING AGREEMENT THAT THE TRAINING HAS BEEN PROVIDED. SCHEDULE OWNER TRAINING WITH AT LEAST 7 DAYS' ADVANCE NOTICE. 15A1-13 SPARE PARTS FURNISH TO OWNER, WITH RECEIPT, THE FOLLOWING SPARE PARTS FOR THE EQUIPMENT FURNISHED FOR THIS PROJECT: A. ONE SET OF SPARE FILTERS OF EACH TYPE REQUIRED FOR EACH UNIT. IN ADDITION TO THE SPARE SET OF FILTERS, INSTALL NEW FILTERS PRIOR TO TESTING, ADJUSTING, AND BALANCING WORK AND BEFORE TURNING SYSTEM OVER TO OWNER. B. FURNISH ONE COMPLETE SET OF BELTS FOR EACH FAN. 15A1-14 WARRANTIES WARRANT EACH SYSTEM AND EACH ELEMENT THEREOF AGAINST ALL DEFECTS DUE TO FAULTY WORKMANSHIP, DESIGN OR MATERIAL FOR A PERIOD OF 12 MONTHS FROM DATE OF SUBSTANTIAL COMPLETION, UNLESS SPECIFIC ITEMS ARE NOTED TO CARRY A LONGER WARRANTY IN THE CONSTRUCTION DOCUMENTS OR MANUFACTURER'S STANDARD WARRANTY EXCEEDS 12 MONTHS. REMEDY ALL DEFECTS, OCCURRING WITHIN THE WARRANTY PERIOD(S), AS STATED IN THE GENERAL CONDITIONS AND DIVISION 1. IF HVAC EQUIPMENT IS USED DURING CONSTRCUTION, THE WARRANTY PERIOD SHALL BEGIN ON DATA OF SUBSTANTIAL COMPLETION. WARRANTIES SHALL INCLUDE LABOR AND MATERIAL. MAKE REPAIRS OR REPLACEMENTS WITHOUT ANY ADDITIONAL COSTS TO THE OWNER. PERFORM THE REMEDIAL WORK PROMPTLY, UPON WRITTEN NOTICE FROM THE ENGINEER OR OWNER. AT THE TIME OF SUBSTANTIAL COMPLETION, DELIVER TO THE OWNER ALL WARRANTIES, IN WRITING AND PROPERLY EXECUTED, INCLUDING TERM LIMITS FOR WARRANTIES EXTENDING BEYOND THE ONE YEAR PERIOD, EACH WARRANTY INSTRUMENT BEING ADDRESSED TO THE OWNER AND STATING THE COMMENCEMENT DATE AND TERM. 15A1-15 CUTTING AND PATCHING PERFORM CUTTING OF WALLS FLOORS CEILINGS ETC. AS REQUIRED TO INSTALL WORK UNDER THIS SECTION. OBTAIN PERMISSION FROM THE ARCHITECT PRIOR TO CUTTING. DO NOT CUT OR DISTURB STRUCTURAL MEMBERS WITHOUT PRIOR APPROVAL FROM THE ARCHITECT. CUT HOLES AS SMALL AS POSSIBLE. GENERAL CONTRACTOR SHALL PATCH WALLS, FLOORS, ETC. AS REQUIRED BY WORK UNDER THIS SECTION. PATCHING SHALL MATCH THE ORIGINAL MATERIAL AND CONSTRUCTION. REPAIR AND REFINISH AREAS DISTURBED BY WORK TO THE CONDITION OF ADJOINING SURFACES IN A MANNER SATISFACTORY TO THE ARCHITECT. 15A1-16 ROUGH -IN COORDINATE WITHOUT DELAY ROUGHING -IN WITH GENERAL CONSTRUCTION. CONCEAL PIPING AND CONDUIT ROUGH -IN EXCEPT IN UNFINISHED AREAS AND WHERE OTHERWISE SHOWN. 15A1-17 STRUCTURAL STEEL STRUCTURAL STEEL USED FOR SUPPORT OF EQUIPMENT DUCTWORK AND PIPING SHALL BE NEW, CLEAN, AND CONFORM TO ASTM DESIGNATION A-36. SUPPORT MECHANICAL COMPONENTS FROM THE BUILDING STRUCTURE. DO NOT SUPPORT MECHANICAL COMPONENTS FROM CEILINGS, OTHER MECHANICAL OR ELECTRICAL COMPONENTS, AND OTHER NON-STRUCTURAL ELEMENTS. 15A1-18 ACCESS DOORS CONTRACTOR TO FIELD DETERMINE REQUIRED LOCATIONS FOR ACCESS OR MAINTENANCE.OF INSTALLED EQUIPMENT, VALVES, DAMPERS, ETC. AND PROVIDE ACCESS DOORS IN CEILINGS, WALLS, ETC. WHERE INDICATED OR REQUIRED. OBTAIN ARCHITECT'S APPROVAL OF TYPE, SIZE, LOCATION AND COLOR BEFORE ORDERING. PROVIDE CONCEALED HINGES, SCREWDRIVER -TYPE LOCK, ANCHOR STRAPS; MANUFACTURED BY MILCOR, ZURN, TITUS, OR EQUAL. 15A1-19 PENETRATIONS PROVIDE SLEEVES FOR PIPES PASSING THROUGH ABOVE GRADE CONCRETE OR MASONRY WALLS CONCRETE FLOOR OR ROOF SLABS. SLEEVES ARE NOT REQUIRED FOR CORE DRILLED HOLES IN EXISTING MASONRY WALLS, CONCRETE FLOORS OR ROOFS. PROVIDE 10 GAUGE GALVANIZED STEEL SLEEVES FOR SLEEVES 6" AND SMALLER. PROVIDE GALVANIZED SHEET METAL SLEEVES FOR LARGER THAN 6". SCHEDULE 40 PVC SLEEVES ARE ACCEPTABLE FOR INSTALLATION IN AREAS WITHOUT RETURN AIR PLENUMS. SEAL ELEVATED FLOOR, EXTERIOR WALL AND ROOF PENETRATIONS WATERTIGHT AND WEATHERTIGHT WITH NON -SHRINK, NON -HARDENING COMMERCIAL SEALANT. PACK WITH MINERAL WOOL AND SEAL BOTH ENDS WITH MINIMUM OF 1/2" OF SEALANT. SEAL AROUND PENETRATIONS OF FIRE RATED ASSEMBLIES. COORDINATE FIRE RATINGS AND LOCATIONS WITH THE ARCHITECTURAL DRAWINGS. REFER TO ARCHITECTURAL SPECIFICATIONS FOR FIRE STOPPINGS. PROVIDE A PRODUCT SCHEDULE FOR UL LISTING LOCATION WALL OR FLOOR RATING AND INSTALLATION DRAWING FOR EACH PENETRATION FIRE STOP SYSTEM. EXTEND PIPE INSULATION FOR INSULATED PIPE THROUGH FLOOR, WALL AND ROOF PENETRATIONS, INCLUDING FIRE RATED WALLS AND FLOORS. THE VAPOR BARRIER SHALL BE MAINTAINED. SIZE SLEEVE FOR A MINIMUM OF 1" ANNULAR CLEAR SPACE BETWEEN INSIDE OF SLEEVE AND OUTSIDE OF INSULATION. PROVIDE PREFABRICATED ROOF CURBS MANUFACTURED BY CUSTOM CURB, INC., PATE COMPANY, THYCURB OR FROM EQUIPMENT'S MANUFACTURER. PROVIDE ROOF CURB WITH FACTORY INSTALLED WOOD NAILER; WELDED, 18 GAUGE GALVANIZED STEEL SHELL, BASE PLATE AND FLASHING; 1-1/2" THICK, 3 POUND RIGID INSULATION; FULLY MITERED 3 -INCH RAISED CANT; COVER OF WEATHER -RESISTANT, WEATHER-PROOF MATERIAL AND PIPE COLLAR OF WEATHER -RESISTANT MATERIAL WITH STAINLESS STEEL PIPE CLAMPS. COORDINARE RESPONSIBILITY OF ROOF CURBS FOR EQUIPMENT PROVIDED BY KITCHEN EQUIPMENT CONSULTANT WITH KITCHEN EQUIPMENT CONSULTANT. PROVIDE BOX FRAMES FOR RECTANGULAR OPENINGS WELDED 12 GAUGE GALVANIZED STEEL ATTACHED TO FORMS AND OF A MAXIMUM DIMENSION ESTABLISHED BY THE ARCHITECT. NOTIFY THE GENERAL CONTRACTOR OR ARCHITECT BEFORE INSTALLING ANY BOX OPENINGS NOT SHOWN ON THE ARCHITECTURAL OR STRUCTURAL DRAWINGS. SEAL CONCRETE OR MASONRY EXTERIOR WALL PENETRATIONS BELOW GRADE WITH "WALL PIPES" AND MECHANICAL SLEEVE SEALS. PROVIDE CAST IRON'WALL PIPES" WITH INTEGRAL WATERSTOP RING MANUFACTURED BY JOSAM, JAY R. SMITH, WADE, WATTS OR ZURN. PROVIDE MODULAR MECHANICAL SLEEVE SEALS, MANUFACTURED BY THUNDERLINE / LINK SEAL, CALPICO,, INC. AND METRAFLEX. SEAL ELEVATED CONCRETE SLAB WITH WATER PROOF MEMBRANE PENETRATIONS WITH "WALL PIPES" AND WATER PROOF SEALANT. SECURE WATERPROOF MEMBRANE FLASHING BETWEEN "WALL PIPE" CLAMPING FLANGE AND CLAMPING RING. PROVIDE CAST IRON "WALL PIPES" WITH INTEGRAL WATERSTOP RING MANUFACTURED BY JOSAM, JAY R. SMITH, WADE, WATTS OR ZURN. PROVIDE SLEEVES FOR HORIZONTAL PIPE PASSING THROUGH OR UNDER FOUNDATION. SLEEVES SHALL BE CAST IRON SOIL PIPE TWO NOMINAL PIPE SIZES LARGER THAN THE PIPE SERVED. PROVIDE SCHEDULE 40 PVC PIPE SLEEVES FOR VERTICAL PRESSURE PIPE PASSING THROUGH CONCRETE SLAB ON GRADE. SLEEVES SHALL BE ONE NOMINAL PIPE SIZE LARGER THAN THE PIPE SERVED AND TWO PIPE SIZES LARGER THAN PIPE SERVED FOR DUCTILE IRON PIPES WITH RESTRAINING RODS. SEAL WATER -TIGHT WITH SILICONE CAULK. PROVIDE 1/2" THICK CELLULAR FOAM INSULATION AROUND PERIMETER OF NOW PRESSURE PIPE PASSING THRU CONCRETE SLAB ON GRADE. INSULATION SHALL EXTEND TO 2" ABOVE AND BELOW THE CONCRETE SLAB. 15A1-20 AIR FILTERS PROVIDE FARR 30/30, PLEATED, THROWAWAY TYPE FILTERS, OR SIMILAR AS MANUFACTURED BY AMERICAN AIR FILTER, FLANDERS OR APPROVED EQUAL, UNLESS OTHERWISE INDICATED. AIR UNITS SHALL HAVE NEW FILTERS INSTALLED WHEN THEY ARE OPERATED BEFORE FINAL ACCEPTANCE. IF HVAC EQUIPMENT IS USED DURING THE CONSTRUCTION PERIOD, CONTRACTOR SHALL PROVIDE ONE SET OF FILTERS WHEN THE UNIT IS STARTED AND REPLACE FILTERS WHEN NEEDED, BUT NOT LESS THAN EVERY MONTH. ON THE DAY OF SUBSTANTIAL COMPLETION, THE CONTRACTOR SHALL CLEAN THE UNIT AND PROVIDE A NEW SET OF FILTERS IN THE UNIT. 15A1-21 ELECTRICAL WIRING LINE VOLTAGE WIRING SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR. LINE VOLTAGE CONTROL AND INTERLOCK WIRING FOR MECHANICAL SYSTEMS SHALL ALSO BE PROVIDED BY THE ELECTRICAL CONTRACTOR. LOW VOLTAGE CONTROL WIRING SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. FURNISH WIRING DIAGRAMS TO THE ELECTRICAL CONTRACTOR AS REQUIRED FOR PROPER EQUIPMENT HOOKUP. COORDINATE WITH THE ELECTRICAL CONTRACTOR THE ACTUAL WIRE SIZING AMPS FOR MECHANICAL EQUIPMENT (FROM THE EQUIPMENT NAMEPLATE) TO ENSURE PROPER INSTALLATION. 15A1-22 REFRIGERANTAND OIL PROVIDE FULL REFRIGERANT AND OIL CHARGE IN NEW AIR CONDITIONING REFRIGERATION SYSTEMS, AND MAINTAIN IT FOR FULL TERM OF THE GUARANTEE. 15A1-23 FINAL TESTING AND ADJUSTMENTS PERFORM TEST READINGS ON FANS, UNITS, COILS, ETC. AND ADJUST EQUIPMENT TO DELIVER SPECIFIED AMOUNTS OF AIR. PREPARE TESTING AND BALANCING REPORT LOG SHOWING AIR SUPPLY QUANTITIES, AIR ENTERING AND LEAVING TEMPERATURES AND PRESSURES, FAN AND UNIT TEST READINGS, MOTOR VOLTAGE AND AMP DRAWS, ETC., AND SUBMIT TWO COPIES OF THE FINAL COMPILATION OF DATA TO THE ARCHITECT FOR EVALUATION AND APPROVAL BEFORE FINAL INSPECTION OF THE PROJECT. BALANCE AIR SYSTEMS TO WITHIN PLUS OR MINUS 10 PERCENT FOR TERMINAL DEVICES AND BRANCH LINES AND PLUS OR MINUS 5 PERCENT FOR MAIN DUCTS AND AIR HANDLING EQUIPMENT OF THE AMOUNT OF AIR SHOWN ON THE DRAWINGS. FURTHER ADJUSTMENTS SHALL BE MADE ( TO OBTAIN UNIFORM TEMPERATURE IN SPACES. ADJUST EQUIPMENT TO OPERATE AS ( INTENDED BY THE SPECIFICATION. ALIGN BEARINGS AND REPLACE BEARINGS THAT HAVE DIRT OR FOREIGN MATERIAL IN THEM WITH NEW BEARINGS WITHOUT ADDITIONAL COST TO ( THE OWNER. BALANCE CONTRACTOR SHALL INCLUDE IN THE REPORT ANY IMPROPERLY INSTALLED OR MISSING BALANCING DEVICES THAT WOULD NEGATIVELY IMPACT THE SYSTEM OPERATION. ADJUST THERMOSTATS AND CONTROL DEVICES TO OPERATE AS INTENDED. ADJUST BURNERS, PUMPS, FANS, ETC. FOR PROPER AND EFFICIENT OPERATION. CERTIFY TO ARCHITECT THAT ADJUSTMENTS HAVE BEEN MADE AND THAT SYSTEM IS OPERATING SATISFACTORILY. FURTHER ADJUSTMENTS SHALL BE MADE TO OBTAIN UNIFORM TEMPERATURE IN SPACES. CALIBRATE, SET, AND ADJUST AUTOMATIC TEMPERATURE CONTROLS. CHECK PROPER SEQUENCING OF INTERLOCK SYSTEMS, AND OPERATION OF SAFETY CONTROLS. 15A1-24 EQUIPMENT FURNISHED BY OTHERS PROVIDE NECESSARY EQUIPMENT AND ACCESSORIES THAT ARE NOT PROVIDED BY THE EQUIPMENT SUPPLIER OR OWNER TO COMPLETE INSTALLATION OF EQUIPMENT FURNISHED BY OTHERS, IN LOCATIONS AS INDICATED ON THE DRAWINGS AND/OR DESCRIBED IN THE GENERAL NOTES TO THIS CONTRACTOR. EQUIPMENT AND ACCESSORIES NOT PROVIDED BY THE EQUIPMENT SUPPLIER MAY INCLUDE FLUES, VENTS, INTAKES, ASSOCIATED ROOF JACKS AND CAPS TO OUTDOORS, DAMPERS, IN- LINE FANS, ROOF FANS, CONTROL INTERLOCKS, ETC. AS REQUIRED FOR PROPER OPERATION OF THE COMPLETE SYSTEM IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECT ROUGH -IN DIMENSIONS, AND SHALL VERIFY SAME WITH ARCHITECT AND/OR EQUIPMENT SUPPLIER PRIOR TO SERVICE INSTALLATIONS. 15A1-25 MISCELLANEOUS REMODELING WORK REMOVE ALL UNUSED EQUIPMENT DUCTWORK PIPING AND ASSOCIATED SUPPORTS. CAP DUCTWORK AND PIPING AT MAINS AND SEAL AIR AND WATER TIGHT. PROVIDE ITEMS OF HVAC SYSTEMS MODIFICATION REQUIRED BECAUSE OF BUILDING REMODELING, AS NOTED ON THE DRAWINGS OR NECESSARY FOR PROPER OPERATION. MATCH EXISTING MATERIALS AND CONSTRUCTION TECHNIQUES WHEN MODIFYING EXISTING SYSTEMS UNLESS SPECIFIED OTHERWISE. COORDINATE ADDITIONAL REQUIREMENTS WITH GENERAL CONTRACTOR AND ARCHITECT. SEAL AIRTIGHT EXISTING DUCTWORK REQUIRED TO BE ABANDONED IN PLACE OR NOT IN USE AT THE TERMINATION OF THE WORK. 15A1-26 VIBRATION ISOLATION MANUFACTURERS: PROVIDE VIBRATION ISOLATION EQUIPMENT AND MATERIALS BY A SINGLE MANUFACTURER. APPROVED MANUFACTURERS PROVIDED THEIR SYSTEMS ARE IN COMPLIANCE WITH THE SPECIFIED DESIGN AND PERFORMANCE REQUIREMENTS INCLUDE AMBER BOOTH KINETICS NOISE CONTROL MASON INDUSTRIES INC. VIBRATION ELIMINATOR CO., INC., AND VIBRATION MOUNTING AND CONTROLS. GENERAL REQUIREMENTS: SELECT VIBRATION ISOLATORS BY THE WEIGHT DISTRIBUTION TO PRODUCE UNIFORM DEFLECTION. VIBRATION ISOLATORS SHALL HAVE EITHER KNOWN UN -DEFLECTED HEIGHTS OR CALIBRATION MARKINGS SO THAT, AFTER ADJUSTMENT, THE STATIC DEFLECTION CAN BE VERIFIED, THUS DETERMINING THAT THE LOAD IS WITHIN THE PROPER RANGE OF THE ISOLATOR. ISOLATORS SHALL OPERATE IN THE LINEAR PORTION OF THEIR LOAD VERSUS DEFLECTION CURVES. SPRING ISOLATORS SHALL HAVE 50 PERCENT EXCESS CAPACITY WITHOUT BECOMING COIL BOUND. COAT VIBRATION ISOLATORS WITH FACTORY -APPLIED PAINT. COAT VIBRATION ISOLATORS EXPOSED TO WEATHER AND OTHER CORROSIVE ENVIRONMENTS WITH FACTORY -APPLIED CORROSION RESISTANCE PROTECTION. INSTALL AND ADJUST VIBRATION ISOLATORS IN ACCORDANCE WITH MANUFACTURERS WRITTEN INSTRUCTIONS. PIPE CONNECTIONS. PROVIDE FLEXIBLE CONNECTORS FOR PIPING SYSTEM CONNECTIONS ON EQUIPMENT SIDE OF SHUTOFF VALVES FOR ALL PUMPS MECHANICAL EQUIPMENT SUPPORTED OR SUSPENDED BY SPRING ISOLATORS AND WHERE INDICATED ON DRAWINGS. FABRICATE FLEXIBLE PIPING CONNECTORS FROM STAINLESS STEEL BRONZE OR RUBBER MATERIALS AS SUITABLE FOR SYSTEM FLUID. FLEXIBLE PIPING CONNECTORS SHALL BE BELLOWS, SPHERICAL OR BRAIDED HOSE TYPE AS RECOMMENDED BY THE MANUFACTURER FOR THE APPLICATION. ISOLATOR TYPES A. TYPE WP (WAFFLE PADS): PROVIDE 5/16 INCH THICK NEOPRENE PADS RIBBED OR WAFFLED ON BOTH SIDES. MANUFACTURE PADS WITH BRIDGE BEARING QUALITY NEOPRENE AND SELECT FOR A MAXIMUM DUROMETER OF 50 AND DESIGNED FOR 15 PERCENT STRAIN. INCORPORATE STEEL LOAD -SPREADING PLATES WHERE REQUIRED BETWEEN THE EQUIPMENT AND THE NEOPRENE PAD. IF THE ISOLATOR IS BOLTED TO THE STRUCTURE, INSTALL A NEOPRENE VIBRATION ISOLATION WASHER AND SLEEVE (UNIROYAL TYPE 620/660 OR AS APPROVED) SHALL BE INSTALLED UNDER THE BOLT HEAD BETWEEN THE STEEL WASHER AND THE BASE PLATE. PROVIDE MASON INDUSTRIES TYPE W OR EQUAL. B. TYPE CMB (CURB MOUNTED BASE): CURB MOUNTED BASE FOR ROOF -MOUNTED EQUIPMENT SHALL BE A STRUCTURAL STEEL BASE MOUNTED DIRECTLY TO THE STRUCTURE WITH AN UPPER FLOATING SECTION ON ADJUSTABLE STEEL SPRINGS. THE UPPER FRAME SHALL PROVIDE CONTINUOUS SUPPORT FOR THE EQUIPMENT. STEEL SPRINGS SHALL REST ON 1/4" MIN. THICKNESS NEOPRENE PADS AND SHALL HAVE A MINIMUM STATIC DEFLECTION OF 2" UNLESS OTHERWISE SPECIFIED. ALL -DIRECTIONAL SNUBBER BUSHINGS SHALL BE 1/4" MINIMUM THICKNESS NEOPRENE. ALL HARDWARE SHALL BE CADMIUM OR ZINC ELECTROPLATED TO PROVIDE A RUST RESISTANT FINISH. WEATHER PROOFING SHALL CONSIST OF A CONTINUOUS GALVANIZED FLEXIBLE COUNTERFLASHING NAILED OVER THE LOWER CURB'S WATERPROOFING AND JOINED AT THE CORNERS BY EPDM BELLOWS. ALL SPRING LOCATIONS SHALL HAVE ACCESS PORTS WITH REMOVABLE WATERPROOF COVERS TO ALLOW FOR ADJUSTMENT OR REPLACEMENT OF SPRINGS. LOWER CURBS SHALL HAVE PROVISION FOR 2" INSULATION. DUCT CONNECTIONS SHALL BE MADE USING A LENGTH OF FLEXIBLE DUCT DIMENSIONED TO MATCH THE EQUIPMENT OPENING, USING A FOAM RUBBER GASKET TO SEAL AGAINST THE UNIT BOTTOM. PROVIDE MASON INDUSTRIES TYPE RSC OR EQUAL. C. TYPE NR (NEOPRENE MOUNTS): PROVIDE NEOPRENE, RUBBER -IN -SHEAR MOUNTS FOR LIGHT WEIGHT, SUSPENDED EQUIPMENT SUPPORTED FROM STRUCTURE WITH ALL THREAD ROD AND ANGLE IRON OR UNISTRUT. PROVIDE MASON INDUSTRIES TYPE HMIB OR EQUAL. 15A2 DUCT INSULATION, DUCTWORK, ACCESSORIES, FLUES AND FANS 15A2-1 DUCTINSULATION PROVIDE INSULATION PER DUCTWORK INSULATION SCHEDULE ON DRAWINGS. PROVIDE INCREASED THICKNESS WHERE ENERGY CODES DICTATE A MORE STRINGENT REQUIREMENT. LINER SURFACE SHALL SERVE AS A BARRIER AGAINST INFILTRATION OF DUST AND DIRT, SHALL MEET ASTM C 1338 FOR FUNGI RESISTANCE AND SHALL BE CLEANABLE USING DUCT CLEANING METHODS AND EQUIPMENT OUTLINED BY NORTH AMERICAN INSULATION MANUFACTURERS ASSOCIATION (NAIMA) DUCT CLEANING GUIDE. INSTALL WITH LINER ADHESIVE AND MECHANICAL FASTENERS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. DUCTWORK SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. INCREASE SHEET METAL BY LINER THICKNESS IN BOTH DIRECTIONS WHERE LINER IS INSTALLED. INSULATING MATERIALS, ADHESIVES, COATINGS, ETC., SHALL NOT EXCEED FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPED RATING OF 50 PER ASTM E 84. CONTAINERS FOR MASTICS AND ADHESIVES SHALL HAVE U.L. LABEL. PROVIDE EXTERIOR RECTANGULAR DUCT WITH INTERNAL AND EXTERNAL INSULATION PER DUCTWORK INSULATION SCHEDULE. PROVIDE EXTERNAL FIREPROOFING FOR RECTANGULAR OR ROUND KITCHEN EXHAUST DUCT SYSTEMS PER DUCTWORK INSULATION SCHEDULE. 15A2-2 DUCTWORK ALL METAL DUCTWORK SCHEDULED FOR INTERIOR THERMAL AND ACOUSTICAL LINER IS NOT SIZED ON PLANS TO INCLUDE THE PROPER THICKNESS OF INSULATION. ADD 1 INCH OR 2 INCHES IN HEIGHT AND WIDTH OF DUCTWORK TO ACCOMMODATE INSULATION THICKNESS. MOUNT DUCT SPECIALTIES SUCH AS TURNING VANES, DAMPER, ETC., TO DUCTWORK WITH THE SECTION INSULATED "BUILD OUTS" TO MAINTAIN CONTINUITY OF THERMAL BARRIER. PROVIDE GALVANIZED STEEL DUCTWORK AND HOUSINGS AS SHOWN ON DRAWINGS. CONSTRUCT DUCTWORK INCLUDING FITTINGS AND TRANSITIONS IN CONFORMANCE WITH CURRENT SMACNA STANDARDS RELATIVE TO GAUGE, BRACING, JOINTS, ETC. MINIMUM THICKNESS OF DUCT SHALL BE 26 -GAUGE SHEET METAL. REINFORCE HOUSINGS AND DUCTWORK OVER 30" WITH 1-1/4" ANGLES NOT LESS THAN 5'-6" ON CENTERS, AND CLOSER IF REQUIRED FOR SUFFICIENT RIGIDITY TO PREVENT VIBRATION. SUPPORT HORIZONTAL RUNS OF DUCT FROM STRAP IRON HANGERS ON CENTERS NOT TO EXCEED 8'-0". DO NOT SUPPORT CEILING GRID, CONDUITS, PIPES, EQUIPMENT, ETC. FROM DUCTWORK. COORDINATE ROUTING OF DUCTWORK WITH OTHER CONTRACTORS SUCH THAT PIPING, ELECTRICAL CONDUIT, AND ASSOCIATED SUPPORTS ARE NOT ROUTED THROUGH THE DUCTWORK. CONSTRUCT SUPPLY DUCTS TO MEET SMACNA POSITIVE PRESSURE OF 2" W.G. CONSTRUCT RETURN, OUTDOOR AND EXHAUST DUCTWORK UPSTREAM OF FANS TO MEET SMACNA NEGATIVE PRESSURE OF 1" W.G. CONSTRUCT GREASE EXHAUST DUCTWORK UPSTREAM OF FANS TO MEET SMACNA NEGATIVE PRESSURE OF 2" W.G. CONSTRUCT EXHAUST DUCTWORK DOWNSTREAM OF FANS TO MEET SMACNA POSITIVE PRESSURE OF 1" W.G. PROVIDE MILL PHOSPHATIZED OR GALVANEALED FINISH FOR EXPOSED DUCTWORK TO BE FIELD PAINTED. SHOP TREATED SHEET METAL SHALL HAVE GALVANIZED METAL PRIMER APPLIED IN THE SHOP AFTER FABRICATION AND PRIOR TO SHIPPING. ALL EXPOSED ROUND DUCTWORK AND FITTINGS SHALL BE SINGLE-WALL, GALVANIZED STEEL, SPIRAL LOCK SEAM, WITH1-INCH DUCT LINER. OUTER SHELL SHALL BE "PAINT -GRIP" SHEET METAL. PROVIDE DOUBLE-WALL ROUND DUCTWORK AND FITTINGS AS MANUFACTURED BY UNITED MCGILL OR APPROVED EQUAL. SEAL DUCTWORK WITH HEAVY LIQUID SEALANT, HARDCAST IRONGRIP 601, DESIGN 3 POLYMER DP 1010, UNITED MCGILL DUCT SEALER OR APPROVED EQUAL, APPLIED ACCORDING TO SEALANT MANUFACTURER'S INSTRUCTIONS. FOR DUCTS WITH PRESSURE CLASSIFICATION OF 2" W.G. AND GREATER SEAL LONGITUDINAL AND TRANSVERSE DUCTWORK JOINTS AIRTIGHT TO MEET SMACNA CLASS B. FOR DUCTS WITH PRESSURE CLASSIFICATION LESS THAN 2" W.G. SEAL TRANSVERSE JOINTS AIRTIGHT TO MEET SMACNA CLASS C. TAPES AND MASTICS SHALL BE LISTED AND LABELED IN ACCORDANCE WITH UL 181A. FOR EXHAUST DUCTS OPERATING UNDER POSITIVE PRESSURE SEAL JOINTS AND PENETRATIONS TO MEET SMACNA SEAL CLASS A. PROVIDE RADIUS ELBOWS, TURNS, AND OFFSETS WITH A MINIMUM CENTERLINE RADIUS OF 1-1/2 TIMES THE DUCT WIDTH. WHERE SPACE DOES NOT PERMIT FULL RADIUS ELBOWS, PROVIDE SHORT RADIUS ELBOWS WITH A MINIMUM OF TWO CONTINUOUS SPLITTER VANES. VANES SHALL BE THE ENTIRE LENGTH OF THE BEND. PROVIDE MITERED ELBOWS WHERE SPACE DOES NOT PERMIT RADIUS ELBOWS, WHERE SHOWN ON THE DRAWINGS, OR AT THE OPTION OF THE CONTRACTOR WITH THE ENGINEER'S APPROVAL. MITERED ELBOWS LESS THAN 45 DEGREES SHALL NOT REQUIRE TURNING VANES. MITERED ELBOWS 45 -DEGREES AND GREATER SHALL HAVE SINGLE THICKNESS TURNING VANES OF SAME GAUGE AS DUCTWORK, RIGIDLY FASTENED WITH GUIDE STRIPS IN DUCTWORK. VANES FOR MITERED ELBOWS SHALL BE PROVIDED IN ALL SUPPLY AND EXHAUST DUCTWORK AND IN RETURN AND OUTSIDE AIR DUCTWORK THAT HAS AN AIR VELOCITY EXCEEDING 1000 FPM. DO NOT INSTALL VANES IN GREASE DUCTWORK. DUCTS SHALL BE CONNECTED TO FANS, FAN CASINGS AND FAN PLENUMS BY MEANS OF PROVIDE BALANCING DAMPERS, MANUFACTURED BY RUSKIN, GREENHECK, NAILOR INDUSTRIES, CESCO LOUVERS & DAMPERS POTTORFF OR APPROVED EQUAL WHERE SHOWN ON DRAWINGS AND WHEREVER NECESSARY FOR COMPLETE CONTROL OF AIR FLOW. SPLITTER DAMPERS SHALL BE CONTROLLED BY LOCKING QUADRANTS; PROVIDE YOUNG REGULATOR OR VENTLOK END BEARINGS FOR THE DAMPER ROD. RECTANGULAR VOLUME DAMPERS SHALL BE OPPOSED BLADE INTERLOCKING TYPE. ROUND VOLUME DAMPERS SHALL BE BUTTERFLY TYPE CONSISTING OF CIRCULAR BLADE MOUNTED TO A SHAFT. DAMPER LEAKAGE FOR OUTSIDE AIR DAMPERS SHALL NOT EXCEED 4.0 CFM/SQUARE FOOT IN FULL CLOSED POSITION AT 1" WG PRESSURE DIFFERENTIAL ACROSS DAMPER. REFERENCE MANUFACTURER AND MODEL NUMBER FOR OUTSIDE AIR DAMPERS IS RUSKIN MODEL CD -50. PROVIDE FLEXMASTER MODEL STO OR EQUAL 45 DEGREE RECTANGULAR/ROUND SIDE TAKEOFF FITTING WITH MODEL SLBO DOUBLE BEARING DAMPER WITH INSULATION BUILD OUT FOR ROUND DUCTWORK BRANCH TAKEOFFS TO INDIVIDUAL AIR DEVICES. OMIT DAMPER AT TAKEOFF FITTING WHEN DAMPER IS LOCATED DOWNSTREAM OF TAKEOFF. WHERE ACCESS TO DAMPERS THROUGH A HARD CEILING IS REQUIRED, PROVIDE A METROPOLITAN AIR TECHNOLOGY MODEL RT -250 OR EQUAL BY YOUNG'S REGULATOR CONCEALED, CABLE OPERATED VOLUME DAMPER WITH REMOTE OPERATOR. DAMPER SHALL BE ADJUSTABLE THROUGH THE DIFFUSER FACE OR FRAME WITH STANDARD 1/4" NUTDRIVER OR FLAT SCREWDRIVER. CABLE ASSEMBLY SHALL ATTACH TO DAMPER AS ONE PIECE WITH NO LINKAGE ADJUSTMENT. POSITIVE, DIRECT, TWO-WAY DAMPER CONTROL SHALL BE PROVIDED WITH NO SLEEVES, SPRINGS OR SCREW ADJUSTMENTS TO COME LOOSE AFTER INSTALLATION. SUPPORT CABLE ASSEMBLY TO AVOID BENDS AND KINKS IN CABLE. ROUND OR OVAL DUCTWORK SHALL BE SEMCO, UNITED, WESCO OR EQUAL, SHEETMETAL, WITH SMOOTH INTERIOR SURFACE, WITH LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) ROUND DUCTWORK GAUGES PER THE FOLLOWING TABLE (REFERENCE SMACNA HVAC DUCT CONSTRUCTION STANDARDS FOR GAUGES WHEN PRESSURES EXCEED 2" W.G.): LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) FITTINGS 24" IN DIAMETER AND LESS SHALL BE PREFABRICATED, SPOTWELDED AND INTERNALLY SEALED. CONTINUOUSLY WELD FITTINGS LARGER THAN 24" IN DIAMETER. FITTING GAUGE SHALL BE 22 GAUGE FOR 36" FITTINGS AND UNDER, 20 GAUGE FOR LARGER SIZES. 90 DEGREE TEE'S SHALL BE CONICAL TYPE. SEAL LONGITUDINAL AND TRANSVERSE DUCTWORK JOINTS AIRTIGHT WITH HEAVY LIQUID SEALANT APPLIED ACCORDING TO MANUFACTURER'S INSTRUCTIONS. PROVIDE GAUGE THICKNESS IN MEDIUM PRESSURE DUCT PRESSURE CLASS 3" TO 6" W.G. DUCTWORK AS RECOMMENDED BY SMACNA. AT CONTRACTORS OPTION, PROVIDE DUCTMATE, GRIPPLE, OR APPROVED EQUAL WIRE ROPE DUCT HANGING SYSTEM. PROVIDE DUCTMATE WR10 THROUGH WR40 OR GRIPPLE NO. 1 THROUGH NO. 5 WIRE ROPE USING 7X7 OR 7X19 AIRCRAFT QUALITY ZINC COATED CABLE OR GALVANIZED STEEL WIRE ROPE. SECURE WIRE ROPE TO DUCT USING DUCTMATE CLUTCHER OR GRIPPLE HANG FAST ADJUSTABLE ROPE ATTACHMENT. FOR SEISMIC APPLICATIONS, WIRE ROPE SYSTEMS SHALL BE SEISMIC TESTED CONFORMING TO GR 63 LEVEL 4 SEISMIC. WHERE APPLICABLE FOR UPPER ATTACHMENT, PROVIDE DUCTMATE EZ -LOCK WIRE ROPE BEAM CLAMP WITH LOCKING NUT ADJUSTMENT OR GRIPPLE CEILING, BEAM, OR PURLIN CLIPS. WIRE ROPE, ADJUSTABLE DUCT ATTACHMENT, AND UPPER ATTACHMENT TO STRUCTURE SHALL EACH HAVE MINIMUM 5 TO 1 LOAD SAFETY FACTOR. ALL GREASE EXHAUST DUCTWORK FROM THE KITCHEN EXHAUST HOOD TO THE KITCHEN EXHAUST FAN SHALL BE 16 -GAUGE WELDED BLACK IRON, LIQUID TIGHT, AND SHALL CONFORM TO THE LATEST EDITION OF NFPA BULLETIN 96 AND TO ALL LOCAL CODES REGARDING ELBOWS, TRAPS, ACCESS DOORS, AND INSULATION. ALL DUCTWORK FROM THE TEMPERED SUPPLY MAKE-UP AIR FAN TO THE EXHAUST HOOD SHALL CONFORM TO CURRENT SMACNA STANDARDS AND THE LATEST EDITION OF NFPA BULLETIN 96. ALL WELDED BLACK IRON DUCT SHALL BE WRAPPED WITH 3M, 615+, ZERO CLEARANCE INSULATING MATERIAL AS SPECIFIED. 15A2-3 FLEXIBLE DUCT LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) AND MEDIUM PRESSURE (DUCT PRESSURE CLASS 2.1" TO 6" W.G.) FLEXIBLE DUCT SHALL BE FLEXMASTER TYPE 8B, THERMAFLEX TYPE G -KM, M -KE, OR EQUAL (FIRE RETARDANT POLYETHYLENE) PROTECTIVE VAPOR BARRIER, U.1.181 CLASS 1, ACOUSTICAL INSULATED DUCT, R-5.0 FIBERGLASS INSULATION. PROVIDE CPE LINER WITH STEEL WIRE HELIX MECHANICALLY LOCKED OR PERMANENTLY BONDED TO THE LINER. FLEXIBLE DUCT RUNS SHALL NOT EXCEED 5 FEET IN LENGTH, AND SHALL BE INSTALLED FULLY EXTENDED AND STRAIGHT AS POSSIBLE AVOIDING TIGHT TURNS. INSTALL FLEXIBLE DUCT IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. SUPPORT FLEXIBLE DUCT AT MAXIMUM 5 FEET ON CENTER AND WITHIN 6 INCHES OF BENDS. BENDS SHALL NOT EXCEED A CENTERLINE RADIUS OF ONE DUCT DIAMETER. DUCT SAG SHALL NOT EXCEED 1/2 INCH. SUPPORTING MATERIAL IN DIRECT CONTACT WITH THE DUCT SHALL NOT BE LESS THAN 1-1/2 INCHES IN WIDTH. CONNECT FLEXIBLE DUCT TO RIGID METAL DUCT OR AIR DEVICES AS RECOMMENDED BY THE MANUFACTURER. AT A MINIMUM, INSTALL TWO WRAPS OF DUCT TAPE AROUND THE INNER CORE CONNECTION AND A METALLIC OR NON-METALLIC CLAMP OVER THE TAPE AND TWO WRAPS OF DUCT TAPE OR A CLAMP OVER THE OUTER JACKET. DUCT CLAMPS SHALL BE LABELED IN ACCORDANCE WITH UL -181 BAND MARKED 181B -C. DUCT TAPE SHALL BE LABELED IN ACCORDANCE WITH UL 181B AND MARKED 181 B -FX. 15A2-4 AIR DEVICES PROVIDE AIR DEVICES AS SCHEDULED ON DRAWINGS, MANUFACTURED BY CARNES, E.H. PRICE, KRUEGER NAILOR INDUSTRIES TITUS OR TUTTLE & BAILEY. SELECT AIR DEVICES TO LIMIT ROOM NOISE LEVEL TO NO HIGHER THAN NC -30 UNLESS OTHERWISE SHOWN. PROVIDE DEVICES WITH A SOFT PLASTIC GASKET TO MAKE AN AIRTIGHT SEAL AGAINST THE MOUNTING SURFACE. COORDINATE FINAL LOCATION, FRAME, AND MOUNTING TYPE OF AIR DEVICES WITH ARCHITECTURAL REFLECTED CEILING PLANS. SUBMIT COMPLETE SHOP DRAWINGS INCLUDING INFORMATION ON NOISE LEVEL, PRESSURE DROP, THROW, CFM FOR EACH AIR DEVICE, STYLES, BORDERS, ETC. CLEARLY MARKED WITH SPECIFIED EQUIPMENT NUMBER. SUBMIT SAMPLES OF EACH AIR DEVICE AS REQUESTED BY THE ENGINEER. PROVIDE CEILING MOUNTED AIR DEVICES OF LAY -IN OR SURFACE MOUNTED TYPE AS REQUIRED TO BE COMPATIBLE WITH CEILING CONSTRUCTION. PROVIDE CEILING DIFFUSERS AND GRILLES WITH WHITE ENAMEL FINISH UNLESS NOTED OTHERWISE. 15A2-5 EXHAUST AIR SYSTEMS PROVIDE EXHAUST FANS AS SCHEDULED ON THE DRAWINGS, OR EQUAL COOK, GREENHECK, CARNES, TWIN CITY FANS, ACME OR PENNBARRY COMPLETE WITH ISOLATED BLOWER UNIT AND CEILING GRILLE. PROVIDE DISCONNECT SWITCH, BACKDRAFT DAMPER, ROOF CURB, AND SPEED CONTROLLER. 15A3 HVAC EQUIPMENT 15A3-1 REFRIGERANT PIPING AND INSULATION PROVIDE ASTM B 280, TYPE ACR HARD DRAWN COPPER REFRIGERANT PIPING, CLEANED AND SEALED AT THE FACTORY, AND SPECIFICALLY DESIGNED FOR REFRIGERANT. FITTINGS SHALL BE HARD DRAWN AND HAVE LONG RADIUS TURNS. SOLDER JOINTS WITH "SILFOS" 15 PERCENT SILVER 5 PERCENT PHOSPHORUS, 80 PERCENT COPPER, 1300 DEGREES FAHRENHEIT FLOW TEMPERATURE). SOLDER JOINTS WITH A SLOW STREAM OF DRY NITROGEN PASSING THROUGH THE PIPING. INSULATE SUCTION LINES WITH 1"AND LIQUID LINES WITH 1/2" FOAMED PLASTIC INSULATION, ARMAFLEX OR EQUAL. PIPING INSULATION SHALL HAVE AFLAME SPREAD OF 25 OR LESS, AND A SMOKE DEVELOPED RATING OF 50 OR LESS WHEN TESTED IN ACCORDANCE WITH ASTM E84. COAT INSULATION THAT IS EXPOSED TO THE ELEMENTS WITH A PROTECTIVE SEALER. INSTALL AND SUPPORT PIPING TO KEEP NOISE AND VIBRATION TO A MINIMUM. SUPPORT AND SECURE PIPING TO UNISTRUT TYPE SUPPORTS SO THAT NO VIBRATION PASSES TO THE BUILDING STRUCTURE. PIPE ATTACHMENTS SHALL BE COPPER -PLATED OR HAVE NONMETALLIC COATING FOR ELECTROLYTIC PROTECTION WHERE ATTACHMENTS ARE INDIRECT CONTACT WITH COPPER TUBING. INSTALL A SUPPORT WITHIN ONE FOOT OF EACH CHANGE OF DIRECTION. MOUNT PIPE HANGERS AROUND THE OUTSIDE OF THE INSULATION WITH SADDLES TO PREVENT HANGERS FROM RUPTURING THE INSULATION. REPLACE INSULATION THAT IS CUT OR BROKEN BY THE HANGERS.RUN REFRIGERANT LINES PARALLEL AND PERPENDICULAR TO WALL AND FLOOR LINES AND TO APPEAR STRAIGHT AND IN GOOD ORDER. PITCH SUCTION LINES DOWN SLIGHTLY (1" IN 20') TOWARDS THE COMPRESSOR. PROVIDE OIL TRAPS AT THE BASE OF VERTICAL SUCTION RISERS OVER 6 FEET HIGH. INSTALL LIQUID LINE SIGHT GLASSES IN LIQUID LINES NEAREST THE EXPANSION VALVE. FACTORY MOUNT EXPANSION VALVES WITH THE SENSING BULBS SHIPPED LOOSE. FIELD MOUNT EXPANSION VALVE BULB AFTER REFRIGERANT PIPING IS COMPLETE (DAMAGE MAY OCCUR IF BULBS COME IN CONTACT WITH HEAT). FOR SYSTEMS OF 5 TON CAPACITY AND SMALLER, THE CONTRACTOR SHALL HAVE THE OPTION TO PROVIDE COPPER REFRIGERANT TUBING LINE SET SIZED AS RECOMMENDED BY EQUIPMENT MANUFACTURER AND OF LENGTH AS REQUIRED FOR THE INSTALLATION. PROVIDE 1" THICK FOAMED PLASTIC INSULATION, ARMAFLEX OR EQUAL, ON THE SUCTION LINE. COAT INSULATION THAT IS EXPOSED TO THE ELEMENTS WITH A PROTECTIVE SEALER. PROVIDE QUICK -CONNECT FLARE TUBING COMPRESSION FITTINGS OR SOLDER CONNECTIONS AS REQUIRED TO MATCH THE CONNECTIONS OF THE CONDENSING UNIT AND EVAPORATOR COIL. 15A3-2 SYSTEM EVACUATION AND CHARGING BLOW OUT REFRIGERATION LINES WITH DRY NITROGEN ATA SUITABLE PRESSURE BEFORE MAKING FINAL CONNECTION AT THE CONDENSING UNIT OR COIL TO ENSURE AGAINST DIRT, SCALE, OR OTHER FOREIGN MATERIAL BEING IN THE LINES. DRAW A VACUUM TO 29" OF MERCURY. BREAK THIS VACUUM BY CHARGING DRY REFRIGERANT GAS INTO THE SYSTEM, RAISING THE PRESSURE TOO PSIG. REPEAT THE LATTER TWO STEPS FOR A TRIPLE EVACUATION BEFORE THE FINAL EVACUATION IS STARTED. MAKE FINAL EVACUATION BY REDUCING THE SYSTEM ABSOLUTE PRESSURE TO A MAXIMUM OF 0.5 MILLIMETERS (500 MICRONS) AND ALLOWING THE PUMP TO RUN AT THIS PRESSURE FOR A MINIMUM OF TWO HOURS. REPEAT THE PROPER AMOUNT OF REFRIGERANT CHARGE PER THE MANUFACTURER'S RECOMMENDATIONS. RECORD THE AMOUNT OF REFRIGERANT BY WEIGHT CHARGED INTO THE SYSTEM FOR EACH CIRCUIT RECORDED TO THE NEAREST 1/4 POUND ON TAGS AND ATTACH TAGS TO THE LIQUID LINE NEAR THE CONDENSING UNIT. REFRIGERANT SHALL BE SUPPLIED BY THE HVAC CONTRACTOR. 15A4 TEMPERATURE CONTROLS 15A4-1 GENERAL REQUIREMENTS CONTRACTOR SHALL PROVIDE A DETAILED LAYOUT OF THE EXISTING HYDRONIC RADIANT HEATING SYSTEM INCLUDEING THERMOSTATTFEMPERATURE SENSOR LOCATIONS, HYDRONIC LOOP LAYOUT AND FLEXIBLE CONNECTORS. FLEXIBLE CONNECTORS SHALL BE NEOPRENE COATED GLASS DENOTE WHICH HYDRONIC HEATERS ARE CONTROLLED BY WHICH TEMPERATURE CONTROL DEVICE. CLOTH CANVAS CONNECTIONS, DURO-DYNE, ELGEN, VENTFABRIC OR EQUAL. FLEXIBLE CONNECTORS SHALL HAVE A FLAME SPREAD OF 25 OR LESS AND SMOKE DEVELOPED PROVIDE NEW 7 -DAY PROGRAMMABLE THERMOSTATS FOR ALL NEW FURNACES. RATING NOT HIGHER THAN 50. MAKE AIRTIGHT JOINTS AND INSTALL WITH MINIMUM 1-1/2" 04/24/2020 SLACK. REVISE CONTROLS FOR EXISTING RTU'EX-RTU-1' TO INCORPORATE NEW TEMPERATURE SENSORS. anzl961xerzn`ry_1 2 3 4 5 REVISION City of Wheat Ridge Building Division k1irtm engineering consultants CLIENT: THE RTO GROUP DENVER,CO D C EOR STAMP PROJECT: K O LL J W 0 O W Of H J U LLL ISSUANCE: C_ G W 0 < � LJ_ 0 ` W W Z 0 2i Z 0 C0 G B PERMIT SET REVISIONS: # DATE 0 0 04/24/2020 LJ. W W O W � (]:�J J�jU O W Z `J Cw G 0 Q 0 � ``J^ W 06 M LLU 2 B PERMIT SET REVISIONS: # DATE DESCRIPTION NOT USED 04/24/2020 REVISIONS 06/11/2020 REVISIONS DATE: 12/30/2019 PROJECT NUMBER: 19. RT0.003 DRAWN BY: CHECKED BY: BH MB A SHEET TITLE: MECHANICAL SPECIFICATIONS SHEET NO: F M303 NOTES: 1. ALL FIXTURES SHALL BE PROVIDED WITH 4100K LAMPS UNLESS NOTED OTHERWISE 2. EQUAL ALTERNATE FIXTURES ARE ACCEPTABLE. ALL ALTERNATE FIXTURES SHALL BE SUBMITTED TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING. City of Wheat Ridge Building Division k1ir engineering consultants 650 E. Algonquin Rd. Butte 250 Schaumburg, Illinois 80173 rtmassucietes.com 1847.756.4180 Client: EOR Stamp: Project: Montessori School Location: Wheat Ridge Issuance: ISSUED FOR PERMIT Revisions: Date: 12/23/2019 Project Number: 19.RTO.001 Drawn By: Checked By: CL JI ELECTRICAL GENERAL NOTES & SYMBOLS Sheet No.: E000 ELECTRICAL SYMBOL LIST GENERAL DEMOLITION NOTES GENERAL NOTES MOUNTING HEIGHTS =0 # DUPLEX RECEPTACLE, # INDICATES CIRCUIT 1, EACH CONTRACTOR SHALL REVIEW THE EXISTING SYSTEMS IN THE FIELD ALONG WITH BID DOCUMENTS & DETERMINE 1. THIS INSTALLATION SHALL BE IN COMPLIANCE WITH THE 2017 NEC AND ALL APPUCABLE LOCAL CODES.11 0' 1 6'I SELECTIVE DEMO & ADDITION OF TEMPORARY SYSTEMS (IF REQUIRED) TO MAKE PHASED DEMO & PROPOSED =Q OR DUPLEX RECEPTACLE, GROUND FAULT CIRCUIT INTERRUPTER REMODEUNG. IT SHALL ASSURE UNINTERRUPTED SAFE OPERATION OF AREAS THAT ARE AFFECTED BY DEMO & ADDITION 2. BEFORE COMMENCING WORK THE CONTRACTOR SHALL VISIT THE JOB SITE AND FULLY INFORM HIMSELF OF ALL OF PROPOSED SYSTEMS AT ALL TIMES. INCLUDE THE NECESSARY WORK TO ACCOMPLISH THIS & COORDINATE PHASING CONDITIONS THAT AFFECT THE WORK, EXAMINE THE DRAWINGS AND SPECIFICATIONS, AND SUBMIT ANY QUESTIONS IN A s ACCORDINGLY. WRITING TO THE ENGINEER, AWP DUPLEX RECEPTACLE, WEATHER PROOF 2. CONFIRM WITH THE MANUFACTURERS OF EXISTING EQUIPMENT THAT IS TO BE REUSED OR EXTENDED. 3. ALL ELECTRICAL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE PROJECT SPECIFICATIONS AND ALL OTHER AA AUDIBLE ALARM DRAWINGS RELATED TO THE PERFORMANCE OF THE WORK. SS SAFETY STROBE SIMPLEX RECEPTACLE 3. WHERE EXISTING ELECTRICAL WORK PREVENTS PROPER CONSTRUCTION OF NEW WORK AS INDICATED, REMOVE, REROUTE, W WALL PHONE RELOCATE, OR IN OTHER WAYS ALTER EXISTING WORK IN ORDER TO ACCOMMODATE. 4. THE CONTRACTOR RESPONSIBLE FOR THE EXECUTION OF THIS WORK SHALL BECOME THOROUGHLY FAMILIAR WITH THE S LIGHT SWITCH PROJECT SPECIFICATIONS BEFORE COMMENCING ANY WORK. THE PROJECT SPECIFICATIONS AND DRAWINGS FORM THE T T -STAT TR❑s O © ❑O ® © # QUADPLEX RECEPTACLE (# INDICATES CIRCUIT) 4. WHERE EXISTING CONDUIT, WIRE, SUPPORTS, HANGERS & OTHER ELECTRICAL WORK MUST BE REMOVED AS A RESULT BASIS OF THIS CONTRACT REQUIREMENTS AND INCLUDE THE TYPE AND GRADE OF MATERIALS TO BE INSTALLED, E RECCE/DATA EPTACLE OF THE ALTERATIONS, THEY SHALL BE COMPLETELY REMOVED, BACK TO THE FIRST OUTLET WHICH IS LEFT UNAFFECTED EQUIPMENT TO BE FURNISHED, THE MANNER BY WHICH TO BE INSTALLED AND WHERE TO BE LOCATED. IN THE EVENT F WALL MOUNTED FURNITURE FEED BY THE DEMOLITION. CONDUIT WHICH IS BURIED IN CONCRETE OR OTHERWISE INACCESSIBLY POSITIONED MAY BE OF A CONFUCT BETWEEN THE PROJECT SPECIFICATIONS AND DRAWINGS, SPECIFICATIONS GOVERN UNLESS THE o R RECEPTACLE MOUNTED ABOVE �AC ABANDONED. IN SUCH CASES, WIRE SHALL BE PULLED OUT & THE CONDUIT SHALL BE PLUGGED AT EACH END. ARCHITECT/ENGINEER DIRECTS OTHERWISE. co < •i MILLWORK OR 4.5" ABOVE COUNTER ABOVE COUNTER QUADPLEX RECEPTACLE, MOUNT AT +440AFF QD OR SINK/LAV. VERIFY COUNTER UNLESS NOTED OTHERWISE 5. EXISTING ELECTRICAL MATERIALS & EQUIPMENT, INCLUDING UGHTING FIXTURES, SWITCHES, RECEPTACLES, SIGNAL UGHTS, 5. THE ELECTRICAL CONTRACTOR SHALL CHECK CAREFULLY ALL CONSTRUCTION DRAWINGS AND SPECIFICATIONS THAT ARE E❑ 0 HEIGHTS WITH ARCHITECTURAL SPEAKERS, INTERCOM EQUIPMENT, CONTROLS, CONDUIT OUTLETS, FITTINGS, & OTHER DEVICES REMOVED AS A RESULT PART OF THIS PROJECT TO ENSURE THAT NO FIXTURE, OUTLET, ALARM STATION OR CONTROL AND POWER WIRING IS ELEVATION DRAWINGS $CDG CEILING MOUNTED DUPLEX RECEPTACLE OF THE ALTERATIONS SHALL REMAIN THE PROPERTY OF THE OWNER (UNLESS OTHERWISE INDICATED) & SHALL BE OMITTED. HE SHALL CONSULT ALL TRADES FURNISHING EQUIPMENT AND OBTAIN FROM THEM ALL DATA. IN SOME CASES ❑F CR CARD READER REUSED WHERE INDICATED. EQUIPMENT, FIXTURES AND DEVICES ARE SHOWN ONLY. ASCERTAIN AND PROVIDE THE WIRING AND CONTROL STATIONS C CO2 SENSORS REQUIRED FOR THE PROPER FUNCTION OF BUILDING EQUIPMENT. NO EXTRA CHARGES SHALL BE ACCEPTED BY OWNER M FIRE ALARM PULL STATION ABOVE COUNTER DUPLEX RECEPTACLE, MOUNT AT +40"AFF 6. EXAMINE THE CONDITION OF ANY SUCH MATERIALS & EQUIPMENT TO MAKE A PRIOR DETERMINATION OF WHETHER IT IS AFTER BIDDING FOR SUCH EQUIPMENT AND LABOR. UNLESS NOTED OTHERWISE SUITABLE FOR REUSE. PRESENT FINDINGS TO THE ENGINEER WHO WILL IN TURN MAKE THE FINAL DECISION REGARDING REUSABILITY. ALL WIRE &CABLE FOR REUSED &RELOCATED EQUIPMENT SHALL BE NEW. fi. EQUIPMENT LABELS AND INSTRUCTIONS REGARDING THE APPLICATION AND INSTALLATION OF THE LISTED EQUIPMENT SHALL NOTES: 1. ALL HEIGHTS FOR OUTLETS ARE To CENTER of DEVICE UNLESS OTHERYBSE INDICATED. ® COORDINATE WITH ARCHITECTURAL DRAWINGS. WHERE OIFFERI NCES EXIST, USE ARCHITECTURAL FLOOR MOUNTED DUPLEX RECEPTACLE FLUSH MOUNTED) ( ) BE FOLLOWED TO INSURE THAT THE EQUIPMENT IS BEING INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S USTING MOUNTING HEIGHTS. 7 TO COORDINATEOF THE MECHANICAL & TRADES, REMOVE EXISTING WORK INSTRUCTIONS. THE RATURE RATING OF EQUIPMENT MUST BE CAREFULLY CORRELATED WITH THE ® FLOOR MOUNTED QUADRUPLEX RECEPTACLE (FLUSH MOUNTED) IN &RDER ABOVE CEILING OF THESE AREAS (AS REQUIRED). AFTER WHICHINSTALLNEW WORK & RENSTALLLEXISTING WORK CONDUCTOR AMPACITY TO PREMATURETERMINATIONS PREVENT OVERHEATING AND FAI URE. TO REMAIN, AS SHOWN ON THE DRAWINGS. EXISTING MATERIALS & EQUIPMENT SHALL BE REUSED ONLY WHERE ABBREVIATIONS ® FLOOR MOUNTED DATA RECEPTACLE (FLUSH MOUNTED) INDICATED. 7. INSTALL ELECTRICAL DEVICES AS INDICATED IN THIS SET OF DRAWINGS. ADJUST FINAL DEVICE LOCATIONS AS REQUIRED TO ACCOMMODATE WORK. COORDINATE WITH ALL TRADES INVOLVED AND WITH ARCHITECTURAL CASEWORK AND ELEVATIONS 8. SOME EXCEPTIONS MAY ARISE WHEREIN EQUIPMENT, EITHER IN ALTERED AREAS OR OTHER AREAS, MUST BE KEPT IN DRAWINGS. NOTIFY THE ENGINEER AND/OR THE ARCHITECT IF ANY CONFLICTS ARE FOUND PRIOR TO BIDDING PROJECT. ® SPECIAL RECEPTACLE SERVICE, REQUIRING THAT FEEDERS, SIGNAL CONDUCTORS, CONDUITS, BOXES, ETC. SERVING SAME ALSO BE KEPT IN INSTALL CONDUIT AND BOXES TO CLEAR EMBEDDED DUCTS, OPENINGS AND OTHER STRUCTURAL FEATURES. WP WEATHER PROOF SERVICE. IN SUCH CASES, THOSE ELECTRICAL FEEDERS, SIGNAL CONDUCTORS, CONDUITS, ETC. SHALL BE REROUTED & W WALL MOUNTED DEVICE a HEAVY DUTY DISCONNECT SWITCH RECONNECTED BEFORE PRESENT WORK IS REMOVED. IF THIS IS NOT POSSIBLE, TEMPORARY WIRING SHALL BE 8. ALL WORK IS TO BE DONE IN ACCORDANCE WITH THE LATEST REQUIREMENTS OF THE APPLICABLE CODES AND PROVIDED, AFTER WHICH NEW WORK SHALL BE INSTALLED & TEMPORARY WIRING REMOVED. REGULATIONS. AC ABOVE THE COUNTER 44 DATA OUTLET, INDICATES (1) CATS DROP 9. ANY ELECTRICAL EQUIPMENT THAT IS TAGGED TO BE DISPOSED OF SHALL BE DONE PER APPROVED METHOD IN 9. ALL UGHTING FIXTURES ARE TO BE LOCATED AS REQUIRED ON THE JOB TO CLEAR DUCTS, PIPING, EQUIPMENT, AND/OR N NEW ABOVE COUNTER DATA OUTLET, MOUNT AT +400AFF ACCORDANCE WITH THE CONSTRUCTION PLAN & LOCAL AUTHORITIES. MECHANICAL UNITS. UNLESS NOTED OTHERWISE X EXISTING TO REMAIN 10. THIS DRAWING INDICATES AREAS THAT ARE BEING AFFECTED BY THE DEMOLITION. DASHED UNES SHOW EXISTING 10. CONDUIT RUNS SHOWN ON DRAWINGS ARE DIAGRAMMATIC. ALL CONDUITS SHALL RUN CONCEALED, EXCEPT IN EQUIPMENT MATERIALS & EQUIPMENT TO BE REMOVED. SOLID LINES SHOW EXISTING MATERIALS & EQUIPMENT TO REMAIN. ROOMS AND WHERE APPROVED BY ARCHITECT OR AS INDICATED ON DRAWINGS. C CEILING MOUNTED DEVICE Q JUNCTION BOX ELECTRICAL CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT AFFECTED BY THE DEMOLITION & WILL KEEP NL NIGHT LIGHT REMAINING EQUIPMENT CONNECTED, POWERED TO THE EXISTING CIRCUITS AS REQUIRED. 11. FURNISH AND INSTALL EQUIPMENT DISCONNECT SWITCHES IN STRICT COMPLIANCE WITH CODE REQUIREMENTS. PP POWER POLEWH 11. THIS DRAWING SHOWS A REPRESENTATIVE SAMPLE OF DEMOLITION WORK THAT IS TO TAKE PLACE. NOTE THAT NOT 12. ADJACENT POWER AND DATA CELE DEVICES SHALL BE SPACED NO MORE THAN 4' APART. PROVIDE JUNCTION BOX TANK GAS WATER HEATER EVERY DEVICE, UGHTING FIXTURE, CONDUIT ETC. REQUIRED TO BE DEMOUSHED IS NECESSARILY INDICATED ON THIS MOUNTING BRACKET BETWEEN STUDS AS NEEDED. EWH INSTANTANEOUS ELECTRIC WATER HEATER CR CARD READER PLAN. THE CONTRACTOR SHALL VISIT THE JOB SITE TO FAMILIARIZE HIMSELF WITH THE EXTENT OF EXISTING WORK TO BE DEMOUSHED. 13. ALL RECEPTACLES, TELEPHONE, AND DATA OUTLETS SHALL BE MOUNTED PER MOUNTING HEIGHT LEGEND OR TO MATCH EWC ELECTRICAL WATER COOLER BUILDING STANDARD (WHEN APPUCABLE), UNLESS OTHERWISE NOTED. ALL DEVICES SHALL BE NEW UNLESS OTHERWISE HD ELECTRIC HAND DRYER $OS DUAL TECH WALL MOUNTED OCCUPANCY SENSOR 12. ALL PROPOSED DEMOLITION WORK SHALL BE THOROUGHLY COORDINATED WITH ALL OTHER TRADES. NOTED. WITH AUTO-ON/AUTO-OFF FUNCTION AFF ABOVE FINISH FLOOR 13. MAINTAIN & RESTORE, IF INTERRUPTED, ALL CONDUITS, FEEDERS & BRANCH CIRCUITS PASSING THROUGH RENOVATED 14. ALL FIRE ALARM NOTIFICATION DEVICES SHALL BE MOUNTED AT 80" AFF IN ACCORDANCE WITH ADA, UNLESS OTHERWISE $VS DUAL TECH WALL MOUNTED OCCUPANCY SENSOR AREA & SERVING UNDISTURBED AREAS. NOTED. SPD SURGE PROTECTION DEVICE WITH MANUAL-ON/AUTO-OFF FUNCTION dd� $OV OVERRIDEITCH FOR CEILING OCCUPANCY 14, ANY PORTION OF THE EXISTING CONDUIT SYSTEM THAT IS TO BE REUSED FOR THE NEW INSTALLATION SHALL BE 15. DETERMINE, IN ADVANCE OF PURCHASE, THAT ALL ELECTRICAL MATERIALS AND EQUIPMENT TO BE INSTALLED SHALL FIT CHECKED TO ENSURE THAT IT IS CLEAN, FREE OF DAMAGE, FREE OF CORROSION, & ADEQUATELY SUPPORTED. INTO HE ROOM ORALEMAIALLOCATED,A INDICATEDTHE ALLTHAOWING WINGCIENT CLEARANCE FOR THESENSO SAFE AG/OROFOEQUIPMENT. INCLUDING OTHER LEGEND 15. DISCONNECT & REMOVE ALL ELECTRICAL EQUIPMENT, DEVICES & CONDUITS IN WALLS, FLOORS & CEILING SCHEDULED TOGGLE SWITCH FOR DEMOLTTION. 16. ALL CIRCUITS SHALL HAVE AN EQUIPMENT GROUNDING CONDUCTOR INSTALLED. COLOR OF GROUNDING CONDUCTOR SHALL BE GREEN. SIZE OF GROUNDING CONDUCTOR SHALL BE AS REQUIRED PER LOCAL CODE. .pdd� 3 3 -WAY TOGGLE SWITCH 16. EXISTING ELECTRICAL SYSTEM IS DESCRIBED BASED ON SURVEYS OF EXISTING CONDITIONS THAT ARE VISIBLE DURING % EXISTING FIXTURE TO REMAIN THE DESIGN PHASE. CONTRACTOR SHALL CONFIRM ALL SERVICES PRIOR TO PROCEEDING WITH DEMOLITION. 17. ALL BRANCH CIRCUITS SHALL HAVE A DEDICATED NEUTRAL CONDUCTOR INSTALLED. COLOR OF NEUTRAL CONDUCTOR XO ------ EXISTING TO BE REMOVED D DIMMER SWITCH17. SHALL BE WHITE. PATCH ALL HOLES REMOVAL OF CONDUIT, BOXES, EQUIPMENT, ETC. COMPROMISES THE FIRE RATING OF THESE ITEMS, THE CONTRACTOR 18. ALL CONDUCTOR SHALL BE MADE OF COPPER. MINIMUM WIRE SIZE SHALL BE #12AWG UNLESS OTHERWISE INDICATED, XRL ------ EXISTING TO BE RELOCATED $M MOMENTARY CONTACT CONTROL SWITCH ON -CENTER -OFF POSITION SPOT SHALL SEAL OPENINGS WITH CODE APPROVED FIRE STOPPING MATERIAL. PER BUILDING OWNER REQUIREMENT. UTILIZE SOLID CONDUCTORS FOR WIRE GAGES UP TO #12AWG AND STRANDED %RP ------ EXISTING TO BE REPLACED WITH NEW CONDUCTOR FOR GAGES #10AWG AND LARGER. 18. WHERE FEEDERS OR BRANCH CIRCUITS ARE DISCONNECTED & REMOVED FROM EXISTING PANEL BOARDS, CONTRACTOR CEILING MOUNTED DUAL TECH OCCUPANCY SENSOR SHALL MARK THE AFFECTED BREAKERS IN THOSE PANEL BOARDS AS 'SPARE". INSTALL NEW KNOCK -OUT BLANK INSERT IN PANEL BOX. 19. SPECIAL RECEPTACLES PLUG CONFIGURATION REQUIREMENTS SHALL BE COORDINATED WITH EQUIPMENT PLUG REQUIREMENTS PRIOR TO INSTALLATION. N NEW FIXTURE %NL EXISTING FIXTURE IN NEW LOCATION 19. CONTRACTOR IS TO PERFORM DEMOLITION WORK IN A NEAT, SKILLFUL, & CAREFUL MANNER SO AS NOT TO DAMAGE OR 20. ALL FEEDER AND BRANCH CIRCUIT WIRING INSTALLED INDOORS SHALL USE THHN INSULATION. ALL WIRING INSTALLED XNP EXISTING LOCATION WITH NEW FIXTURE 3/4-C STUB UP TO ABOVE ACCESSIBLE CEIUNG WITH END BUSHING DEFACE EXISTING CONSTRUCTION THAT IS TO REMAIN. OUTDOORS SHALL USE THWN INSULATION. REFER TO SPECIFICATION DOCUMENTS FOR COLOR CODED REQUIREMENTS. 20. VERIFY THAT REMOVAL OF DEVICES IN RENOVATED AREA DOES NOT AFFECT DEVICES IN OTHER AREAS THAT MAY BE FED 21. ALL POWER WIRING SHALL BE INSTALLED IN A DEDICATED RACEWAY SYSTEM. MINIMUM RACEWAY SIZE SHALL BE 3/4-C �- CONDUIT CONCEALED IN WALL/ABOVE THE CEILING FROM THE CIRCUIT BEING DISCONNECTED. UNLESS SE INDICATED. CONTRACTOR SHALL SIZE ALL CONDUITS SO AS TO NOT EXCEED 40% OF CONDUIT FILLING CAPACITY A . ELECTRICAL DRAWING LIST LIGHTING FIXTURE SCHEDULE CONDUIT IN CONCRETE SLAB/UNDERGROUND 22. ALL PULL BOXES AND JUNCTION BOXES SHALL BE SIZED PER NEC. BASED IN THE AMOUNT OF CABLE AND CONDUITS ENTERING/LEAVING THE BOX. E000 - GENERAL NOTES &SYMBOLS FIXTURE LAMPS MOUNTING I poo # WATTS & TYPE ti cN o z � LL SP CEILING MOUNTED SPEAKER SYMBOL VOLTS DESCRIPTION & VARIATIONS MANUFACTURER & CATALOG # OR APPROVED EQUAL 23. ALL BREAKERS SERVING FIRE ALARM AND EXIT SIGNS EQUIPMENT SHALL BE KEY -LOCK STYLE. E001 - ELECTRICAL SPECIFICATIONS D i J w ¢ E100 - FIRST FLOOR PLAN POWER & SIGNAL 24. SERVICE EQUIPMENT AND BRANCH CIRCUIT PANELBOARDS SHALL HAVE AN UPDATED PANEL DIRECTORY INSTALLED UPON F1 B ® UNIVERSAL MOUNTED (CEILING/WALL) EXIT SIGN WITH CHEVRONS PROJECT COMPLETION. UTILIZE TYPE WRITER AS A MINIMUM FOR COMPLIANCE. HAND WRITTEN CARD DIRECTORIES ARE E101 - SECOND FLOOR PLAN POWER & SIGNAL L 120/ _ 45W R 2X4 LED LAY -IN DIRECT/INDIRECT LTIHONIA UGHTING NOT ACCEPTABLE. E200 - FIRST FLOOR PLAN LIGHTING 277 FIXTURE 2BLT4-48L-ADSM-EZI-LP840 DC SECURITY DOOR CONTACT (PREPARE DOOR, ROUGH -IN ONLY UP 25. ALL FINAL CONNECTIONS TO MOTORS AND VIBRATING EQUIPMENT SHALL BE DONE WITH LIQUID TIGHT FLEXIBLE METAL CONDUIT. INSTALL GREEN GROUNDING CONDUCTOR. E201 - SECOND FLOOR PLAN LIGHTING FlA TO ABOVE ACCESSIBLE CEILING) E300 - ENLARGED KITCHEN PLANS ELECTRICAL L 120/ 27N - 30W R 2X2 LEO LAY -IN DIRECT/INDIRECT FIXTURE IA LIGHTING 2BLT2-33L-ADSM-EZI-LP840 2BLT2 26. E.C. SHALL COORDINATE WITH HVAC CONTRACTOR EXACT POINT OF CONNECTION TO MECHANICAL UNIT PRIOR TO E400 - FIRST FLOOR PLAN EQUIPMENT POWER ,, LJf SINGLE POLE DISCONNECT SWITCH TOGGLE STYLE ROUGH -IN. E.C. SHALL ALSO VERIFY EXACT BREAKER SIZE AND WIRING WITH APPROVED MECHANICAL UNITS SHOP E401 SECOND FLOOR PLAN EQUIPMENT POWER DRAWINGS PRIOR TO INSTALLATION. - MOTOR WITH MOTOR RATED DISCONNECT SWITCH. F2 120/ LITIIONIA LIGHTING 27. SERVICE EQUIPMENT, BRANCH CIRCUIT PANELBQARDS, METER SOCKETS SHALL HAVE AN "ARC -FLASH HAZARD WARNING' E402 - ROOF PLAN EQUIPMENT POWER L 40.4W R RECESSED LEO DOWNLIGHT LDN6-40-10-L06-AR-DSS-MIVOLT- E500 ELECTRICAL RISER DIAGRAMS O 277 - LABEL INSTALLED. LABEL SHALL BE CLEARLY VISIBLE TO PERSONNEL - O WIRELESS ACCESS POINT GZ10 E501 - ELECTRICAL SCHEDULES 28. SERVICE EQUIPMENT AND PANELBOARDS SHALL BE LABELED WITH A READILY VISIBLE LABEL PER NFPA STANDARD FOR CL F3 120/ LIFTHOILIGHTING SAFETY IN THE WORKPLACE, LABEL SHALL READ "CAUTION ARC FLASH HAZARD°. SIZE AND COLOR OF TEXT SHALL BE FA100 - FIRST FLOOR PLAN FIRE ALARM CLOCK � L _ -W R WALL MOUNTED LED VANITY Y PER STANDARD. FA101 - SECOND FLOOR PLAN FIRE ALARM 27N FMVISL-241N-MVOLT-30K-90CRI-XX ❑I INTERCOM CALL BUTTON 29. ALL EQUIPMENT INSTALLED OUTSIDE SHALL BE WEATHER PROOF RATED. REFER TO DRAWINGS FOR ADDITIONAL FA200 - FIRE ALARM NOTES & RISER F4 INFORMATION. L 120/_ 35W W WALL MOUNTED 4' LED LTIHONIA UGHTING ® PB PUSH BUTTON 27N BLWP4-20L-ADSM-LP840 30. INSTALL CONDUIT FROM THE TOP OF THE BAR JOIST. 31. LABEL ALL J -BOX COVER PLATES AND RECEPTACLE COVER PLATES WITH CIRCUIT INFORMATION. TELEVISION FS 120/ SUSPENDED LED LINEAR COOPER LIGHTING L 27N - 22.SW P DIRECT/INDIRECT DSI-WS-30L-840-1-D-UNV-STD-X 32. E.C. SHALL FURNISH AND INSTALL J -BOX AND 3/4"C FOR MECHANICAL THERMOSTAT + CONTROLS. COORDINATE FINAL © �M MAGNETIC HOLD -AC120'-XX-4 LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO ROUGH -IN. E❑ EMERGENCY STOP 3 33. ALL CABLE LOCATED WITHIN CEILING SPACE USED FOR PLENUM AIR RETURN SHALL BE PLENUM RATED. Fob 120/ LTIHONIA LIGHTING L - 35W S SURFACE MOUNTED 2' LED STRIP ZL1N-L24-1500LM-FST-MIVOLT 277V -35K-BOCRI K KEYED SWITCH 120/ LED EXIT SIGN - PROVIDE SINGLE OR DOUBLE FACE AND CHEVRONS AS LTIHONIA UGHTING ® L 277 - 4.5W INDICATED ON PLANS; COORDINATE EDGES-1/2-R/RTES-EL MOUNTING TYPE WITH ARCHITECTURAL CEIUNG TYPES; 90 -MINUTE BATTERY 120/ 2 3W tftS EMERGENCY UGHTING FIXTURE UTHONIAL LIGHTING 27N ELM2-LED TT�7iCi A1�T NOTES: 1. ALL FIXTURES SHALL BE PROVIDED WITH 4100K LAMPS UNLESS NOTED OTHERWISE 2. EQUAL ALTERNATE FIXTURES ARE ACCEPTABLE. ALL ALTERNATE FIXTURES SHALL BE SUBMITTED TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING. City of Wheat Ridge Building Division k1ir engineering consultants 650 E. Algonquin Rd. Butte 250 Schaumburg, Illinois 80173 rtmassucietes.com 1847.756.4180 Client: EOR Stamp: Project: Montessori School Location: Wheat Ridge Issuance: ISSUED FOR PERMIT Revisions: Date: 12/23/2019 Project Number: 19.RTO.001 Drawn By: Checked By: CL JI ELECTRICAL GENERAL NOTES & SYMBOLS Sheet No.: E000 FIRST FLOOR POWER + DATA PLAN ELECTRICAL GENERAL NOTES 1. REFER TO GENERAL NOTES ON SHEET EDOO. 2. ALL DEVICES ARE NEW UNLESS NOTED OTHERWISE 3. ALL TELE/DATA CABLE SHALL BE CATS AND SHALL BE PROVIDED AND INSTALLED BY CONTRACTOR. COORDINATE ALL TELE/OATA, SECURITY, AND AIV LOCATIONS AND WORK WITH OWNER. 4. EXTERIOR RECEPTACLES SWILL BE GH MID WEATHERPROOF WITH LOCKABLE COVERS 5. LABEL ALL CATB AT EACH END OF THE CABLE. COORDINATE LABELING SYSTEM WITH OWNER. S. LOW VOLTAGE CABLING WHICH IS NOT RUN WITHIN CONDUO SHALL BE SUPPORTED BY J—HOOKS EVERY 5'-0'. 7. ALL RECEPTACLES IN CLASSROOMS, OFFICES AND COMMON AREAS SHALL BE TAMPER RESISTANT. NOT ALL EXISTING RECEPTACLES MAY BE SHOWN ON PLAITS, CONTRACTOR TO VERIFY QUANTITIES IN THE FIELD AND CONFIRM EVERY EXISTING RECEPTACLE IS REPLACED WITH TAMPER PROOF RECEPTACLE OF EQUAL AMPERAGE RATING KEY NOTES 1O EXISTING SERVICE EQUIPMENT. RETER TO RISER DIAGRAM FOR MORE INFORMATION. O NEW EXTERIOR RATED DISCONNECT FOR PANEL M. REFER TO RISER DIAGRAM FOR MORE INFORMATION. O COORDINATE ALL CONNECTION REQUIREMENTS FOR THE NEW LAUNDRY EQUIPMENT WITH THE MANUFACTURER PRIOR TO ROUGH—IN. O NEW FIRE ALARM CONTROL PANEL RE—USE THE EXISTING CIRCUIT TO POWER THE NEW PANEL REVISION k1irk, r't M engineering consultants 650 E. Algonquin Rd. Suite 250 Schaumburg, Illinois 60173 rtmassociates.com 1847.756.4180 Client: EOR Stamp: 12.20.2019 Project: Montessori School Location: Wheat Ridge Issuance: ISSUED FOR PERMIT Revisions: Date: 12/23/2019 Project Number: 19.RTO.001 Drawn By: Checked By: CL H ELECTRICAL FIRST FLOOR POWER & DATA Sheet No.: E100 wwance F1 F1 F1 "1 Flo 0 @ XNL INFANT URE z 132 o® 7 =1RST FLOOR LIGHTING PLAN N 1/8" = 1'-0" ELECTRICAL 0V GENERAL NOTES 1. REFER TO GENERAL NOTES AND LIGHT FIXTURE SCHEDULE ON SHEET E000. 2. EMERGENCY BATTERY PACKS SHALL BE CIRCUITED TO LOCAL CIRCUIT AHEAD OF SWITCHING AND CONTROLS. 3. FOR ALL ROOMS WITH OCCUPANCY SENSORS, CONTRACTOR SHALL PROVIDE ALL REQUIRED SENSORS, POWERPACKS, RELAYS, OVERRIDE SWITCHES, ETC. TO PROVIDE A COMPLETE AND OPERATIONAL SYSTEM. 4. ALL EMERGENCY BATTERY PACKS AND EXIT SIGN BATTERIES SHALL BE TESTED AND REPAIRED OR REPLACED AS NECESSARY SO THAT ALL ARE IN GOOD WORKING ORDER. 5. NEW LIGHTING SHALL BE CIRCUITED TO EXISTING LOCAL LIGHTING CIRCUITS. CONTRACTOR TO FIELD COORDINATE AVAILABLE LIGHTING CIRCUITS WITH DEMOLITION SCOPE. 6. EXTERIOR LIGHTING IS EXISTING TO REMAIN AND IS NOT SHOWN. ENSURE ALL EXTERIOR EGRESS DOORS HAVE OPERATIONAL EMERGENCY BATTERY FIXTURES ABOVE THE DOOR. REPAIR OR REPLACE FIXTURES AS NECESSARY. KEY NOTES O1 NEW EMERGENCY BATTERY PACK SHALL BE CIRCUITED TO LOCAL CIRCUIT AHEAD OF SWITCHING AND CONTROLS. O NEW EXIT SIGN TO BE CIRCUITED TO THE CLOSEST EXIT SIGN CIRCUIT. O PROVIDE NEW HIGH BAY VACANCY SENSORS WITH LOCAL OVERRIDE AS SHOWN TO CONTROL THE EXISTING LIGHTING. REVISION k1irtm engineering consultants 650 E. Algonquin R0. Suite 250 Schaumburg, Illinois 60173 rtmaeeoclales.com 1847.758.4180 Client: EOR Stamp: Project: Montessori School Location: Wheat Ridge Issuance: ISSUED FOR PERMIT Revisions: # I Date: I Description: 2 104/24/201 F.D. REVISIONS 3 06/11/20 REVISIONS Date: 12/23/2019 Project Number: 19.RTO.001 Drawn By: Checked By: CL JI ELECTRICAL FIRST FLOOR LIGHTING PLAN E200 ,FIRST FLOOR EQUIPMENT PLAN 1/8" = 1'-0" ELECTRICAL GENERAL NOTES 1. REFER TO GENERAL NOTES ON SHEET E000. 2. E.C. TO PROVIDE ELECTRICAL CONNECTION FOR MECHANICAL EQUIPMENT AS INDICATED. 3. PROVIDE SEPARATE GROUNDING CONDUCTOR SIZED PER NEC 250.122 INSTALLED ON ALL EQUIPMENT. REFER TO SHEET E5.01 FOR FEEDER, GROUND, As CONDUIT SIZES. KEY NOTES O1 EXHAUST FAN TO BE CIRCUITED AND CONTROLLED WITH LOCAL LIGHTING CIRCUIT. O2 HVAC EQUIPMENT IS EXISTING TO REMAIN. REVISION 'i rtm engineering consultants 650 E. Algonquin Rd. Suite 250 Schaumburg, Illinois 60173 rtmassociates.com 1847.756.4180 Client: EOR Stamp: Project: Montessori School Location: Wheat Ridge T«, ISSUED FOR PERMIT Revisions: # I Date: I Description: 2 104/24/201 F. D. REVISIONS 3 06/11/20 REVISIONS Date: 12/23/2019 Project Number: 19.RTO.001 Drawn By: Checked By: CL JI ELECTRICAL FIRST FLOOR EQUIPMENT PLAN E400 MECHANICAL EQUIPMENT CONNECTION SCHEDULE TAG O DESCRIPTION2Q LOAD O WIRE/CONDUIT ® STARTER/DISCONNECT/OCD (1) VOLTAGE© FEED(2) LOCAL DISCONNECT QB REMARKS Q9 EF EXHAUST FAN (1,2,3,4,5,6) 29.4W 2112 AWG 1 12G AWG EQ. GND 3/4"C. El INTEGRAL TO EQUIPMENT ❑ IN MCC NEMA SIZE El TYPE 120V 10 EXISTING LIGHTING CIRCUIT El FUSED A FUSE ElNON-FUSEDA SWITCH El THERMAL SWITCH, 12DV,10,1P EC TO PROVIDE DISCONNECT _ EF EF EXHAUST FAN 23.8W 2$12 AWG 1 12G AWG EQ. GND 3/4"C. ❑ INTEGRAL TO EQUIPMENT ❑ IN MCC NEMA SIZE El TYPE 120V 10 EXISTING LIGHTING CIRCUIT El FUSED A FUSE El NON—FUSED A SWITCH El THERMAL SWITCH, 1201,10,1P EC TO PROVIDE DISCONNECT A SWITCH CU CONDENSING UNIT 16.2 MCA 3110 AWG 120V 10 M ❑ INTEGRAL TO EQUIPMENT A WATER HEATER 5A El FUSED A NSE DISCONNECT BY EXISTING FEEDER (1,2,3,4,5) 15 25 MOCP 1 10G AWG EQ. GND ❑ IN MCC NEMA SIZE 240V 30 M ❑NON—FUSED A SWITCH YEC.PROVIDED MC. WIRED BY EC. _ _ 4 EXISTINGCIRCUIT 3/4•C 15 , El TYPE TYPE 4 5 20 El THERMAL SWITCH, 120V,10,1P EXISTINGCIRCUIT CU EXISTINGCIRCUIT 12'7 MCA 20.3 MCA 3110 AWG El ❑ INTEGRAL TO EQUIPMENT 20 20 20 20 20 1 1 1 1 1 El El FUSED A FUSE DISCONNECT m BY FURNACE CONDENSING UNIT 30 MOCP 1 10G AWG EQ. GND ❑ IN MCC NEMA SIZE 240V 30 M ElMC NON—FUSED A SWITCH WIRED BYYC. EC. EC. 6 5 1 , CU -2 (LOCATED ON GRADE) 3/4•C 3/4"C. 180 000 ❑ El TYPE , ❑ El THERMAL SWITCH, 12GV,10,1P . CU 16 MCA 22'4 MCA 318 AWG1OG 17 ❑ ❑ INTEGRAL TO EQUIPMENT 2500 103,104,101 RECEPTACLES SPACE ❑ El FUSED A FUSE DISCONNECT m BY FURNACE CONDENSING UNIT 35 MOCP 1 AWG EQ . GND ❑ IN MCC NEMA SIZE 240V 30 M ❑ NON—FUSED A SWITCH MC. WIRED BYYG. EEC. 7 WASHER LAUNDRY 119 DRYER LAUNDRY„9 2500 SPACE 3/4•C 1 C SPARE ❑ ❑ TYPE zsoo SPACE ❑ ❑ THERMAL SWITCH, 1201 1 F FURNACE 9.7 MCA 2112 AWG 120V 10 M El INTEGRAL TO EQUIPMENT A WATER HEATER 5A El FUSED A FUSE EC TO PROVIDE EXISTING FEEDER (1,2,3,4,5) 15 MOCP 12G AWG EQ. GND ❑ IN MCC NEMA SIZE 120V 10 M El NON—FUSEDA SWITCH DISCONNECT _ EEISTINGCIRCUIT 4 EXISTINGCIRCUIT 3/4•C 15 , El TYPE 4 5 20 El THERMAL SWITCH, 12DV,10,1P EXISTINGCIRCUIT F EXISTINGCIRCUIT 12'7 MCA 2112 AWG 1 El INTEGRAL TO EQUIPMENT 7 20 20 20 20 20 1 1 1 1 1 El FUSED A FUSE TO PROVIDE EXISTINGCIRCUIT FURNACE 15 MOCP 1 12G AWG EQ. GND ❑ IN MCC NEMA SIZE 120V 1m M ❑ NON—FUSED A SWITCH DISCONNECT EXI STI NG CIRCUIT 6 20 1 , CU -2 (LOCATED ON GRADE) 3/4•C ,2 180 000 ❑ TYPE 20 , ❑ THERMAL SWITCH, 120V,10,1P „0,,05,,06 RECEPTACLES F F 20 16 MCA 2112 AWG s 17 ❑ INTEGRAL TO EQUIPMENT DRYER LAUNDRY119 coFFEE 136RECEPTACLE 2500 103,104,101 RECEPTACLES SPACE ❑ FUSED A FUSE EC TO PROVIDE 20 FURNACE 20 MOCP 1 12G AWG EQ. GND ❑ IN MCC NEMA SIZE 120V 10 M ❑ NON—FUSED A SWITCH DISCONNECT 20 1 30 z 7 WASHER LAUNDRY 119 DRYER LAUNDRY„9 2500 SPACE 3/4•C SPARE SPARE ❑ TYPE _24- zsoo SPACE ❑ THERMAL SWITCH, 120V,10,1P 20 WH PUMP O.O6HP 2112 AWG ❑ INTEGRAL TO EQUIPMENT 120V 10 M ❑FUSED A FUSE EC TO PROVIDE A WATER HEATER 5A 1 12G AWG EQ. GND ❑ IN MCC NEMA SIZE 120V 10 EXISTING FEEDER ❑NON—FUSED A SWITCH DISCONNECT 1 1020 F 2242 2242 2242 2242 2242 2242 3100 2242 3100 2242 3100 540 2242 2242 2242- AFl8 2242 2242 2242 111]4 1 1164 „e4 ,sz4 2809 1500 2809 11642809 F i F 111]4 200 EXISTINGCIRCUIT 3/4"C. ❑ TYPE z ❑ THERMAL SWITCH, 120V,10,iP 3 P PUMP O.O6HP 2112 AWG 1#12G AWG EQ. ONO 3/4"C. ❑ INTEGRAL TO EQUIPMENT ❑ IN MCC NEMA SIZE ❑ TYPE 120V 10 M ❑ FUSED A FUSE ❑ NON—FUSED A SWITCH ❑ THERMAL SWITCH, 120V,10,1P EC TO PROVIDE DISCONNECT A PANEL. EXISTING PANEL FRAME SIZE. 225A VOLTAGE. 120/24N LOCATION ENTRY HALL 125 MLO ,ODA PHASE 1m FEEDER SEE SINGLE FINE DIAGRAM AC22000 WRE3W CKT No BR P NOTE. ClRCUI T DES CRI PH PHASEA PHASE CIRCUIT DESCRIPTION NOTE BR P CKT No 1 20 , 1 EEISTINGCIRCUIT F-7(LOCATED IN FURNACE 202) 1020 F 2242 2242 2242 2242 2242 2242 3100 2242 3100 2242 3100 540 2242 2242 2242- AFl8 2242 2242 2242 111]4 1 1164 „e4 ,sz4 2809 1500 2809 11642809 F i F 111]4 200 EXISTINGCIRCUIT 15 , z z 3 20 , - EEISTINGCIRCUIT 4 EXISTINGCIRCUIT - 15 , fi 7 4 5 20 1 EXISTINGCIRCUIT 9 EXISTINGCIRCUIT _ 1 15 1 s 7 20 20 20 20 20 1 1 1 1 1 N EEISTINGCIRCUIT EXISTINGCIRCUIT EXI STI NG❑RCUIT EXI STI NG❑RCUIT WASHER LAUNDRY 119 2500 720 180 EXISTINGCIRCUIT - 20 1 9 8 EW EXI STI NG CIRCUIT _ 20 , - 11 IF EXI STI NG CIRCUIT 20 1 , CU -2 (LOCATED ON GRADE) 13 ,2 180 000 EXI STI NG CIRCUIT 20 , 15 ,4 „0,,05,,06 RECEPTACLES N 20 , SPACE s 17 30 2 20 1 N N DRYER LAUNDRY119 coFFEE 136RECEPTACLE 2500 103,104,101 RECEPTACLES SPACE N 20 , 20 1 13 19 21 zo 180 SPACE - SPARE SPARE - 20 22 23 20 1 30 z N N WASHER LAUNDRY 119 DRYER LAUNDRY„9 2500 SPACE - SPARE SPARE - 25 _24- zsoo SPACE 8 29 20 1 - 26 z7 SPACE 15 , 0 28 29 , - Fa (LOCATEDIN FURNACE,3,) SPACE SPACE - s SPACE 32 33 31 30 SPACE SPACE CUA (LOCATED ON GRADE) - 30 3 32 33 35 20 1 SPACE IT FT SPACE 36 37 15 34 35 F -,(LOCATED I N FURNACE,,,) - SPACE 38 39 SPACE _ SPACE SPACE - 3s 37 40 SPACE M5360900 SPACE - F]4(LOCATED I N FURNACE 131) P-A(LOCATED I N BOI LER ROOM Bot) - 20 38 30 SPACE 41 SPACE TOTAL CONNECTED LOAD (VA) TOTAL DIVERSIFIED LOAD (VA) TOTALAMPERAGE 5180 720 SPACE TOTAL CONNECTED AND DEMAND LOADS (VA) TOTALDIVERSIBED LOADS (VA) TOTALAMPERAGE 11832 1 9357 1 7584 40 1 11412 SPACE 21189 1 17119 1 223„ 42 GB=GBBREAKER N= NEW CIRCUIT BREAKS 5900 6280 5846 PANEL. NEW PANEL M FRAME SIZE. 200A VOLTAGE. 120/240 LOCATION. STORAGE ROOM 208 MCB. 200A PHASE 3m FEEDER SEE SINGLE FINE DIAGRAM AC 22,000 WRE4W+G SIFT No. BR P CB. NOTES CIRCUIT DESCRIPTION PHASE PHASE PHASE CIRCUIT DESCRIPTION CB. NOTES BR P CKT No. 20 1 - F-7(LOCATED IN FURNACE 202) 1020 F 2242 2242 2242 2242 2242 2242 3100 2242 3100 2242 3100 540 2242 2242 2242- AFl8 2242 2242 2242 111]4 1 1164 „e4 ,sz4 2809 1500 2809 11642809 F i F 111]4 200 CUS(LOCATED ON THE ROOF) 25 3 z 325 3 - CU -3 (LOCATED ON THE ROOF) - 4 5 - fi 7 CUd(LOCATED ON THE ROOF) - 25 3 8 9 35 3 _ 1 CU-7(LOCATED ON THE ROOF) - ,o 11 - ,2 13 CONVENIENCE RECEPTACLES - 20 , _14- 15 25 3 _ CU-, (LOCATED ON GRADE) SPACE - 6 17 CU -2 (LOCATED ON GRADE) 25 3 19 - 0 21 _ SPACE 23 15 1 - F-2(LOCATED IN FURNACE,,,) SPARE - 20 1 20 1 - SPARE SPARE - 20 , 26 27 20 1 - SPARE SPARE - 20 , 8 29 20 1 - SPARE F-5(LOCATED IN FURNACE 139) - 15 , 0 s , - Fa (LOCATEDIN FURNACE,3,) F -e (LocnTEDw FURNACE,4,) - s , 32 33 _ SPACE CUA (LOCATED ON GRADE) - 30 3 35 20 1 - IT FT - 36 37 15 1 _ F -,(LOCATED I N FURNACE,,,) - 38 39 _ SPACE SPACE - 40 41 20 , - F]4(LOCATED I N FURNACE 131) P-A(LOCATED I N BOI LER ROOM Bot) - 20 , 42 TOTAL CONNECTED AND DEMAND LOADS (VA) TOTALDIVERSIBED LOADS (VA) TOTALAMPERAGE 11832 1 9357 1 7584 1 9536 1 11412 1 10899 21189 1 17119 1 223„ 14583 ri MENT CONNECTION SCHEDULE KEY NOTES: (D VERIFY FINAL LOCATION OF ALL EQUIPMENT WITH EQUIPMENT INSTALLER BEFORE INSTALLING FEEDERS. Q SEE ARCHITECTURAL, MECHANICAL, PLUMBING AND FIRE PROTECTION DRAWINGS FOR MORE INFORMATION. Q SIZE STARTER/FEEDER DISCONNECT PER FINAL EQUIPMENT REQUIREMENTS. Q PROVIDE FEEDER AS INDICATED, VERIFY WITH EQUIPMENT REQUIREMENTS. QQ PROVIDE OVERLOAD PROTECTION (FUSES OR MOTOR CIRCUIT PROTECTOR) PER SPECIFICATIONS, ACTUAL FIELD MEASURED FULL LOAD CURRENT, AND EQUIPMENT MANUFACTURER'S REQUIREMENTS. © VERIFY FINAL VOLTAGE AND PHASE REQUIREMENTS OF ALL EQUIPMENT WITH INSTALLER BEFORE INSTALLING FEEDERS. Q COORDINATE SHORT CIRCUIT OCD RATING WITH FINAL EQUIPMENT REQUIREMENTS. Q EC TO PROVIDE LOCAL DISCONNECT WITHIN 5'-0" OF EQUIPMENT. NON—STANDARD ITEMS, TIMERS, METERS, INTERLOCKS, ETC. EQUIPMENT CONNECTION SCHEDULE GENERAL NOTES: 1. PROVIDE POWER CONNECTIONS TO ALL ARCHITECTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND OWNER FURNISHED EQUIPMENT. REFER TO ARCHITECTURAL, MECHANICAL, PLUMBING, AND FIRE PROTECTION DRAWINGS FOR LOCATIONS AND POWER REQUIREMENTS. VERIFY ALL TECHNICAL DATA WITH FINAL SHOP DRAWINGS. 2. OVER CURRENT PROTECTION SIZES LISTED ARE FROM MANUFACTURER'S AND STANDARD MOTOR DATA, FURNISH FUSES BASED ON FUSE MANUFACTURER'S STANDARDS, ACTUAL FIELD MEASURED FULL LOAD CURRENT, AND EQUIPMENT MANUFACTURER'S REQUIREMENTS. 3. FLEXIBLE CONNECTIONS TO MOTORS SHALL BE IN FLEXIBLE CONDUIT. PROVIDE COPPER EQUIPMENT GROUND FROM DISCONNECT TO MOTOR CONNECTION. GENERAL NOTES 1. REFER TO GENERAL NOTES ON SHEET E000. 2. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY EXACT CIRCUIT NUMBER INFORMATION PRIOR TO CONNECTING ANY NEW CIRCUITS TO THE EXISTING PANELS. PANEL SCHEDULES ARE SHOWN FOR REFERENCE ONLY AND ARE BASED OFF OF SURVEYED CONDITIONS. PROVIDE REVISED PANEL DIRECTORIES AT THE COMPLETION OF THE PROJECT INCLUDE ANY PANELS THAT ARE MAY NOT BE SHOWN WHERE CIRCUITS ARE BEING DEMOLISHED. PANELS OR CIRCUIT BREAKERS ARE NOT TO BE LOADED BEYOND 80% CAPACITY. REVISION engineering consultants 650 E. Algonquin Rd. Suite 250 Schaumburg, Illinois 60179 rtmaeeoclates.com 1847.756.4180 Client: EOR Stamp: Project: Montessori School Location: Wheat Ridge Issuance: ISSUED FOR PERMIT Revisions: Date: 12/23/2019 Project Number: 19. RTO.001 Drawn By: Checked By: CL JI ELECTRICAL EQUIPMENT SCHEDULES E501 FIRST FLOOR FIRE ALARM PLAN 1/4" = 1'-0" ELECTRICAL GENERAL NOTES 1. REFER TO GENERAL NOTES ON SHEET E000. 2. PROVIDE A NEW VOICE EVACUATION FIRE ALARM SYSTEM. ALL FIRE ALARM DEVICES ARE NEW. 3. FIRE ALARM SHALL BE DESIGN -BUILD BY ELECTRICAL CONTRACTOR. DEVICES ARE SHOWN FOR REFERENCE ONLY. IT WILL BE THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY TO VERIFY ANY ADDITIONAL REQUIREMENTS WITH THE FIRE MARSHALL AS PART OF THE BASE BID. 4. THE FOLLOWING FIRE ALARM DRAWINGS ARE SCHEMATIC ONLY. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR BIDDING A COMPLETE & OPERATIONAL FIRE ALARM SYSTEM THAT MEETS LOCAL CODE. E.C. SHALL DEMO/DISCONNECT/RELOCATE ANY EXISTING DEVICES AS NECESSARY & PROVIDE NEW DEVICES AS REQUIRED TO MEET LOCAL MINIMUM REQUIREMENTS & NFPA FIRE CODE. 5. UTILIZE EXISTING FIRE ALARM LOCATIONS AND WIRING PATHWAYS AS APPUCABLE. CONTRACTOR IS RESPONSIBLE FOR TESTING, UPGRADING, AND EXPANDING UPON EXISTING SYSTEM TO CREATE A UL-USTED, CODE -COMPLIANT FIRE ALARM SYSTEM AS REQUIRED BY LOCAL AUTHORDY HAVING JURISDICTION. 6. REFER TO FIRE ALARM SYMBOLS LEGEND ON THIS SHEET. 7. ALL FIRE ALARM PANELS SHALL BE AN APPROVED ADDRESSABLE TYPE. B. A MAP INDICATING THE LOCATION OF ALL FIRE ALARM DEVICES SHALL BE POSTED DIRECTLY ADJACENT TO THE FIRE ALARM PANEL OR IN A LOCATION ACCEPTABLE TO THE FIRE PREVENTION BUREAU. 9. COORDINATE ALL WORK WITH LOCAL FIRE MARSHALL PRIOR TO BID. 10. ALL AUDIOVISUAL DEVICES MAY NOT BE SHOWN AS REQUIRED BY THE LOCAL JURISDICTION HAVING AUTHORITY. ALL DEVICES SHALL BE PROVIDED IN ACCORDANCE WITH NFPA 72, ADA, STATE & LOCAL CODES. A COMPLETE FIRE ALARM DEVICE LAYOUT SHALL BE PROVIDED BY THE FIRE ALARM CONTRACTOR. 11. CONDUIT & WIRING FOR ALL FIRE ALARM DEVICES TO BE RUN WrrHIN COLUMNS OR WALLS WHERE APPUCABLE. ALL WIRING SHALL BE CONCEALED. 12. ALL FIRE ALARMS TO BE AUDIBLE & VISUAL, & COMPLY FULLY TO ICC/ANSI A117.1 SECTION 702. ALL VISUAL ALARMS TO BE SYNCHRONIZED THROUGHOUT. 13. ALL FIRE ALARM WIRING SHALL BE IN CONDUIT. 14. ALL EXISTING FIRE ALARM WIRING TO BE REPLACED AS NECESSARY TO ACCOMMODATE THE NEW FIRE ALARM SYSTEM. KEY NOTES OPROVIDE A CARBON MONOXIDE DETECTOR AT EACH SOURCE OF NATURAL GAS INCLUDING IN THE FIRST ROOM SERVED BY EACH MAIN DUCT LEAVING EACH RN. PROVIDE CENTRAL MONITORING STATION AND TIE INTO FACP. O REPLACE THE EXISTING DUCT DETECTOR AND REMOTE TEST SWITCH WITH NEW DEVICES FOR THE EXISTING RTU THAT IS EXISTING TO REMAIN. CONNECT DEVICES INTO THE NEW SYSTEM. O PROVIDE A NEW KNOX BOX. COORDINATE FINAL LOCATION AND REQUIREMENTS WITH THE AHJ. FIRE ALARM SYMBOL LIST FRA—AP] FIRE ALARM REMOTE ANNUNCIATOR PANEL (WITH CONTROLS AND MIC) ® FIRE ALARM DOUBLE ACTION PULL STATION Q WALL MOUNTED FIRE ALARM STROBE (DEVICE W/ A "C" IS CEILING MTD) Q WALL MOUNTED FIRE ALARM SPEAKER ONLY (W/ A "C" 15 CEILING MTD) ® WALL MOUNTED FIRE ALARM SPEAKER/STROBE (W/ A "C" IS CEILING MTD) (� FIRE ALARM PHOTOELECTRIC SMOKE DETECTOR FIRE ALARM HEAT DETECTOR 0 CARBON MONOXIDE DETECTOR ® FIRE ALARM DUCT DETECTOR REMOTE TEST SWITCH O KNOX BOX REVISION k1irtm engineering consultants 850 E. Algonquin Rd. Sidle 250 Schaumburg, Illinois 60173 rtmassociates.com 1847.758.4180 Client: EOR Stamp: PE.0043682 Project: Montessori School Location: Wheat Ridge Issuance: ISSUED FOR PERMIT Revisions: Date: 12/23/2019 Project Number 19.RTO.001 Drawn By: Checked By: CL JI FIRST FLOOR FIRE ALARM PLAN Sheet No.: FA 100 i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type:05�L�k Job Address: `= c) Permit Number: - � ❑ No one available for inspection: Time iA/PM Re -Inspection required: Ye �. No When corrections have been made ebedul inspection online at: http✓/www.ci.wheatridge.co.ueinspeztio From: no-reolv(alci.wheatridae.m. us To: CommDev Pets Subject: Online Form Submittal: Revision to Permit Application Date: Monday, May 4, 2020 9:14:08 AM Revision to Permit Application Permit Number 202000130 assigned to project PROPERTY INFORMATION Permit Number 202000130 Property Address 3480 Ames St. Property Owner Name 3480 Ames St, LLC Property Owner Phone (214) 517-5059 Number (enter WITH dashes, eg 303-123- 4567) Property Owner Email rebecca@mymidtownmontessori.com Address CONTRACTOR INFORMATION Contact Name Glenn Massarotti Contact Phone Number 303-467-9667 (enter WITH dashes, eg 303-123-4567) Contact Email Address glennm@turnkeygc.com Retype Contact Email glennm@turnkeygc.com Address DESCRIPTION OF WORK Detailed Revised Revised engineering to match the approved architecectural Scope of Work - layout that was approved with the original permit. Provide a detailed description of work including mechanical, electrical, plumbing work occurring, adding/removing walls, etc Engineer Letter (if Field not completed. applicable) Additional Documents on Letter Size Are plans or documents locked for editing? Construction Plans scanned on 11'x17" or larger Additional Project Value Only add what the revised scope of work is valued at. Field not completed. No 0 SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have Yes been authorized by the legal owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Person Submitting Glenn Massarotti Revision Email not displaying correctly? View it in your browser. Mr. Slusser As we discussed this morning, revised plumbing drawings for the subject project were submitted showing a new floor drain in the laundry room, Room #119 on the main floor. The floor drain was redlined to be removed in the revision but the note to remove was missed. While we realize a floor drain is good practice, one is not required for this Occupancy. Furthermore, due to the concrete walls of underfloor pipe tunnels and the piping in the tunnels, it is physically impossible to install a floor drain in the room and make a connection to the sanitary sewer line. 41 CITY TY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: -zc",/ - 1-(-'6 r Job Address: :3 Y �O /4 m� S' 5 f- , Permit Number: <c zu oc" -7 A P-4 s. IJ No one available for inspection: 'Time Re -Inspection required: Yes 09 When corrections have been made, schedule for re -inspection online at: httpYA,vww.ci. wheatridge.co. uslinspection Date: inspector: DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: V U C-) Job Address: Permit Number: ❑ No one available for inspection: Timed ' " AM/PM Re -Inspection required: Yes ` No � 1) When corrections have been made, schedule for re -inspection online at: http.IA,vww.ci.wheatridge.co.uslinspection Date: Inspector: DO NOT REMOVE THIS NOTICE City of Wheat Ridge Comm. Tenant Finish PERMIT - 202000130 PERMIT NO: 202000130 JOB ADDRESS: 3480 Ames St ISSUED: 03/24/2020 EXIRES: 21 JOB DESCRIPTION: Commercial tenant finish converting church building into4private school. Remodel includes upgrade of electrical, 600 AMPS and mechanical/plumbing upgrades. Square footage: 13,554 *** CONTACTS *** OWNER (214)517-5059 3480 AMES STREET, LLC GC (303)467-9667 GLENN MASSAROTTI SUB (720)458-8411 SCOTT BERKMAN 018462 TURN KEY GENERAL CONTRACTORS, SUB (303)988-1509 STEVE DWYER 080190 CURRENT INSTALLATIONS SUB (720)218-2162 Daniel Westenbroek 019508 STEVE'S PLUMBING SERVICE INC 150077 Tri-STone Electric, LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned SUBDIVISION CODE: 501 / USE: UA / Unassigned BLOCK/LOT## : 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 750,000.00 Total Valuation FEES Plan Review Fee 0.00 Use Tax 3,306.58 Permit Fee 15,750.00 ** TOTAL ** 5,087.05 24,143.63 *** COMMENTS *** *** CONDITIONS *** All roughs to be done at Framing Inspection. Approved per plans and red -line notes on plans. Must comply with 2012 IBC, 2017 NEC and all applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections. **Prior to final inspection approval - As-builts are required before approval of the Building Final Inspection and Certificate of Occupancy can be issued. Approved per Case No. SUP -19-02. Placement of signs in the right of way (ROW) contingent upon approval of revocable ROW permit with the Public Works Department. Owner/Contractor is responsible for locating property lines and constructing improvements according to the approved plan and required development standards. The City is not responsible for inaccurate information submitted within the plan set and any construction errors resulting from inaccurate information. City of Wheat Ridge Comm. Tenant Finish PERMIT - 202000130 PERMIT NO: 202000130 JOB ADDRESS: 3480 Ames St ISSUED: 03/24/2020 JOB DESCRIPTION:Commercial tenant finish converting church Rbuilding i3/24/221 o4private school. Remodel includes upgrade of electrical, 600 AMPS and mechanical/plumbing upgrades. Square footage: 13,554 I, by my signature, do hereby attest that the work to be performed shall comply with all accom an ing a applicable building codes, and all applicable municipal codes, policies and procedures, and thatI am thelegal ownernor had ve cpifi l authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as partes to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date I. This permit was issued based on the information provided in the permit application and accompanying Flans and specifications and is subject to the compliance with those documents, and all a licabl 2. This permit shall expire 365 days after the date of issuancepregardless of activity. Requests for textension cmust beies madedinrwriting and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Offcial and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. aThe is uance or grant of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any pp ca 7e c de or a rdinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City Of W heat Pjdgc COMMUNITY DEVELOPMENT Building & Inspection Services 7500 W. 2911 Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: Permits(a)ci.wheatridge.co.us FOR OFFICE USE ONLY Date: Plan/Permit # !�J_cJ&c0 Plan ReviewLL Fee: Building Permit Application *** Complete all applicable highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address. 3480 Ames St. Property Owner (please print): 3480 Ames Street LLC Phone: 214.517.5059 Property Owner Email: rebecca(cDmymidtownacademy. com Tenant Name (Commercial Projects Only) Midtown Montessori Academy Sloans Lake Property Owner Mailing Address: (if different than property address) Address: 1675 W. 67th Ave., Unit 200 City, State, Zip: Denver, CO 80221 Arch itect/Engineer: Richard Teves / The RTO Group Architect/Engineer E-mail: rich@thertogroup.com Phone: 303.964.8282 Contractor Name: Glenn Massarotti / Turn Key General Contractors, Inc. City of Wheat Ridge License #: 018462 Contractor E-mail Address:-glennm@turnkeygc.com For Plan Review Questions & Comments (please print): CONTACT NAME (please print): Rich Teves Phone: 303.467.9667 one: 303.964.8282 CONTACT EMAIL(p/ease print): rich@thertogroup.com and glennm@turnkeygc.com Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form): Electrical: Plumbing: Mechanical: W.R. City License # W.R. City License # W.R. City License # Project is out to bid for subcontractors. to permit issuance Other City Licensed Sub: City License # Subctractors will be listed after they have been chosen prior Other City Licensed Sub: City License # Complete all highlighted fields, if applicable. ®COMMERCIAL ❑ RESIDENTIAL Provide description of work: For ALL projects, provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc. 13,554 SF tenant finish to convert existing church building into private school. Includes upgrade of electr and mechanical systems. Project has been reviewed by zoning for use. Existing boiler system to remain and will be supplemented with additional HVAC. Sq. FULF 13,554 BTUs Amps 600 Squares Gallons For Solar: Kw # of Panels Requires Structural For Commercial Projects Only: Occupancy Type: E Construction Type: III -B Sprinklered Yes X No Occupancy Load: 179 Square Footage: 13,554 Project Value: (Contract value or the cost of all materials and labor included in the entire project) $ q5z'3 c>c o OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT f hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. 1, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLE ONE: (OWNER) (C TRACTOR) or ( THORIZED REPRESEN7ATIVE) of (OWNER) (CONTRACTOR) Signature (first and last name): / - DATE: 12-16-19 Printed Name: Glenn Massarottl ZONING COMMMENTS: Reviewer. ZT ?15 20 BUILDING DEPARTMENT COMMENTS: Reviewer: PUBLIC WORKS COMMENTS: Reviewer: DEPARTMENT USE ONLY OCCUPANCY CLASSIFICATION. E - CONSTRUCTION TYPE: Building Division Valuation: -750 c-'eiy..s�Z a t ill of W heat l is lac CITY OF WHEAT RIDGE BI lit -DING AND INSPECTION SERVICES DIVISION 7500 W 29th Ave Wheat Ridge, CO 80033-8001 p. 303.235.2855.f 303.237.8929 Proof of Submission for Permitting/Plan Review (Water and Sanitation only) A copy of this form must be completed by each water and sanitation agency indicated on the Permit Submittal Checklist for the project type and be attached to the Building Permit Application at the time of submission. Applications presented for submission without a completed Proof of Submission form from a required agency will not be accepted or processed. Date: / - /C Project Address: 3 14 84 Ar -i Name of Firm/Individual submitting documents: -T Project Type/Description: r -6-L J.r— Signature of Firm Representative or Individual: DO NOT WRITE BELOW THIS POINT - FOR AGENCY USE ONLY -ftI, LC� �"- — , am a duly authorized representative of the agency indi ` eFesented: d do, y signature below, hereby acknowledge receipt of documents necessary for review and approvaproject indicated above. A enC re (Please check one) o Wheat Ridge Sanitation District p-' Wheat Ridge Water District o Consolidated Mutual Water District o Clear Creek Sanitation District o Valley Water District o Fruftdale Sanitation District o Denver Water o Westridge Sanitation District o Other Agency Notes: Signature: Zareen Tasneem From: Zareen Tasneem Sent: Thursday, January 23, 2020 4:44 PM To: Teves Richard; Glenn Massarotti Cc: Russ Higgins; Jordan Jefferies Subject: Building Permit for 3480 Ames Street Attachments: Long Term RPA 1-07-2020.doc Hi Rich, You recently submitted a building permit to convert the existing structure at 3480 Ames Street in to a school. Since several of the directional signs fall in the public right-of-way (ROW), you will need to apply for a long-term revocable ROW permit (see attached). Please contact Russ Higgins (CC'ed) at 303-235-2869 if you have questions related to the revocable ROW permit. Once completed, this permit will need to be submitted to Jodi Baros in the Engineering Division. In addition, as part of the SUP approval process for this site and use, the Engineering Division approved signing a portion of the eastern side of Ames Street as loading only during school hours. This would be basically the area on the street directly parallel to the front elevation, where Ames Street narrows. Please update the site plan to reflect these signs as well. Here are some sign suggestions: 1!00 AM TO 4 00 PM SCHOOL DAYS h F PARKING " 'PASSENGER' LADING zQ{14E LOADING ONLY AmTo6pm EXCEPT SUNDAY 30 MINUTE LIMIT a. If going with this option, the sign will need to: i. Be white instead of yellow ii. State "EXCEPT SATURDAY AND SUNDAY" iii. And have a 5 minute limit, if including a time limit Please contact Jordan Jefferies (CC'ed) at 303-235-2868 for questions related to appropriate signage and placement. He reviewed the traffic study and site plan for the SUP and is familiar with the site. These new signs will also need to be reflected in the revocable ROW permit. Best, Zareen Tasneem Planer I Community Development Department Office Phone: 303-235-2852 y� l_City of COMMUNITY DEVELOPMENT CONFIDENTIALITY NOTICE: This e-mail contains business -confidential information. It is intended only for the use of the individual or entity named above. If you are not the intended recipient, you are notified that any disclosure, copying, distribution, electronic storage or use of this communication is prohibited. If you received this communication in error, please notify us immediately by e-mail, attaching the original message, and delete the original message from your computer, and any network to which your computer is connected. Thank you Glenn Massarotti C ---) 61 J_606 / z C2��o From: NoReply@mobile-eyes.com Sent: Wednesday, January 15, 2020 2:28 PM To: Glenn Massarotti Subject: Permit application accepted - West Metro Fire Protection District Your permit request for Midtown Montessori Sloans Lake at 3480 Ames Street Wheat Ridge, CO 80033 has been accepted. The Job Number is: 200115006 Description: Tenant finish to convert church to new private school Thank you for submitting to West Metro Fire. Our typical review turnaround is approximately 5 weeks. You can now view where your plan review is at in the queue! Please click the link below: http://www.westmetrofire.org/1013/Plan-Review-Status BE ADVISED WE NO LONGER ALLOW WORK TO BE DONE PRIOR TO A PERMIT BEING ISSUED AND PLACED ON SITE If additional information is required, you'll receive a notice from the reviewer assigned, or a no -reply notice from Mobile Eyes. Please be sure to check your junk folder if you feel you are not receiving the Mobile Eyes notices and select "Not Junk". If you check the status of your review through your Mobile Eyes Contractor Portal you may see a note that says "zoning checks not passed". This is not checked until a permit has been issued and fees have been paid. This is an internal way for us to keep inspections from being requested until the above has been completed. NOTE: Re -submissions shall only include the pages that are affected and additional pages that may be required for the needed corrections. Re -submission of full sets, unless specifically requested, shall result in the rejection of plans. y W hea. t P N1 ,_ PLAN REVIEW COMMENTS Project Description: Tenant Improvement, Change of Occupancy Project Address: 3480 Ames St. Plan Check No.: 202000130 Permit App. Date: 1/16/2020 Applicant: Rich Teves Phone: 303.964.8282 Applicant email: rich@thertogroup.com Plan Checker: Kirk Money Phone: 303-235-2882 Plan Checker email: kmoney@ci.wheatridge.co.us The project plans were reviewed for compliance with the following codes and standards: 2012 IBC, 2012 IRC, 2012 IMC, 2012 IPC, 2012 IFGC, 2012 IECC, 2017 NEC, ANSI ICC A11 7.1 2009 and City of Wheat Ridge Amendments • TO EXPEDITE PROJECT APPROVAL: Please provide a written response indicating how and where each comment was resolved on the plans. • Resubmit all previously reviewed plans, updated plans and supporting documents with each subsequent review. • For clarification of.any plan review comment, please call or email the plan checker listed ab ove. 1. Please define in the construction documents the age groups for infant, toddler and pri*,mary. Applicant Response: Age group for all students has been added to sheet A001. City Response: Comment accepted and closed. 2. Please clarify in the construction documents that the kitchen is compliant as a comms arcial kitchen or please describe the intent of the kitchen and how it will be used. Applicant Response: The existing kitchen area will primarily be used as a Staff Break r 'oom; the 2 ranges will be removed by the owner. Secondarily, the area will be used by a third -party ca, tering service for organizing snacks & lunches for distribution to the classrooms. All such food is prep ared off-site; no food preparation or cooking will be performed within the facility and the room nam, ? has been changed to Break Room on the plans. City Response: Comment accepted and closed. 3. Please clarify in the construction documents a day care facility that provides care f,, or more than five children 2 %2 years of age or less that each of the classrooms has an exit door direr tly to the exterior per code section 308.6.1 of the IBC. F l c Applicant Response: Each classroom serving students under the age of 2-1/2 yrs. is provided with at least one exit directly to the building exterior. Vestibule 129 has been reconfigured to serve only Rm 130. Cla ssroom 127 is also reconfigured and a new exterior door has been added from the room. City Resfonse: Comment accepted and closed. 4. Please 'clarify that the areas appurtenant to the stage are separated from the stage with a 1hr. fire barrier per code section 410.5 of the IBC. Appli(„ ant Response: The stage area will be used as a secondary indoor exercise area for small groups for basic stretching, yoga and similar activities; a 42" high partition will be constructed across the stage opening to act as a guard for the change in floor height. The rooms appurtenant to the stage area will be usE�d as learning labs for computer and similar instructions. A fire barrier is not required between Group A & E uses. City Response: Comment accepted and closed. 5. Please f)rovide in the construction documents details and the listing for opening, penetrations, ducts and transfer openings that penetrate the fire barriers or horizontal assemblies per code section 707 of the IBC. Applicant Response: Refer to Wall Sections 3/A108 for Sections 707 notes & details. City Response: Appears from section views that mechanicals are not crossing the Fire Barrier. Comment accepted ;and closed. 6. Please pro vide a detailed section view of the existing wall that is being proposed as a fire barrier to create the fire areas. Include in the section view details showing the structure supporting the fire barrier is cc )mpliant with code section 707.5.1 of the IBC. Also, please verify that the existing masonry wall comp) ies with table 721.1(2) and section 722.3 of the IBC. Applicant I lesponse: Refer to Wall Sections 1, 2 & 3/A108 for sections 707.5.1 and 721, 722 notes and details. City Respon se: Comment accepted and closed. 7. Please clarif y the access to the basement areas and the means of egress for the lower level storage areas and be )iter room. Please demonstrate in the construction documents that the basement areas comply with code section 903.2.11.1.3 of the IBC. Applicant Re.- sponse: Egress path of travel has been added to the basement floor plan. Basement areas are not withi n the work area and Section 703.1 of the 2012 IEBC is considered to apply to these rooms. City Responst The new Learning Lab in the basement is a change of use and a higher level of risk to the occupants. TI its area needs to comply with code section 903.2.11.1.3 of the IBC. Applicant resp ,onse: The room in question is not a basement; the access stair to the room is from the stage down to the ground floor (learning lab is at the same floor level as the Exercise room and balance AN i City, o W h6 at 144c Igo 60�0`r of the main floor). The room, the stage and adjacent Exercise Room are provided with window openings in accord with Section 903.2.11.2.2. City Response: Comment accepted and closed. 8. Please include in the project data the occupant loads for all areas per table 1004.1.2 of the IBC. Please update the plumbing fixture count per the occupant load and table 2902.1 of the IBC. Applicant Response: Occupant load tabulation and fixture count per referenced sections of the IBC has been added to sheet A001. City Response: Comment accepted and closed. 9. Please demonstrate in the construction documents that this building is compliant with code section 3411.4.2 of the IBC. Applicant Response: An Accessibility Plan demonstrating compliance with the referenced section has been added to Sheet A002. City Response: Please clarify that the wheelchair access lift is being provided to class room Elementary 1 & 2. Learning Labs are considered part of the primary function and should be along the accessible route. Please clarify in a letter how occupants with a disability will be accommodated. At least one learning Lab shall be along the accessible route and proper signage shall be installed to inform occupants where the accessible learning lab is located. Applicant Response: The wheelchair lift will serve Elementary Room 1; Elementary Room 2 is not accessible and the curriculum and age group for the two rooms is identical. Accessible toilet facilities for Room 1 are provided by new Toilet Room 138. An accessible learning lab along the accessible route to primary functions, as shown on sheet A002 is available in Room 106. All service and instruction offered to each age group in any learning lab will be available to any student in Room 106 regardless of age group. Signage for the entire facility will be provided by the owner's independent signage vendor; the owner has been advised that all signage, including directional signage must be compliance with ANSI A117.1. City Response: Comment accepted and closed. 10. Please demonstrate that the kitchen is accessible and compliant with ICC a117.1-2009. Applicant Response: As discussed under Item 2 above, the Kitchen will be used as a Break Room; accessible clearances at doors and fixtures in the room have been added to the Floor Plan. City Response: Comment accepted and closed. 11. Please clarify that the children's restroom are compliant with ICC A117.1-2009. Water closest shall comply with figure 604.11.2 & figure 604.11.4. Dispenser shall comply with figure 604.11.7 and grab bars shall comply with figure 609.4.2. Applicant Response: Refer to Detail 4/A107 for revised dimensions illustrating compliance with the referenced section. City Response: Comment accepted and closed. 12. Please demonstrate in the construction documents that the laundry room is accessible and compliant with code section 611.1 of the ICC A117.1-2009. Applicant Response: Accessible clearances for doors & equipment have been added to the Floor Plan. City Response: Comment accepted and closed. 13. Please clarify in the construction documents that service water heating complies with code section C404 of the IECC. Applicant Response: To be addressed under separate cover by the Mechanical Engineer. City Response: A response has not been submitted by the Mechanical Engineer. Applicant Response: Letter provided for engineer of record. City Response: Comment accepted and closed. Updated Response 3/12/20 K.M. Updated Response 3/18/20 K.M. March 16, 2020 City of Wheat Ridge — Community Development Building Inspection Services 7500 West 29- Avenue, 2- Floor Wheat Ridge, Colorado 80033 RE: Plan Check No: 202000130 3480 Ames Street Wheat Ridge, Colorado Attn: Mr. Kirk Money With regard to 2nd plan review comments for the subject project, please accept the following: The new learning lab in the basement is a change of use and a higher level of risk to the occupants. This area needs to comply with code section 903.2.11.3 of the IBC. The room in question is not a basement; the access stair to the room is from the stage down to the ground floor (learning lab is at the same floor level as the Exercise Room and balance of the main floor). The room, the stage and adjacent Exercise Room are provided with window openings in accord with Section 903.2.11.1.2. The window into the room in question .. . 62-2131 200 Quebec Street, Building 600. Suite 201 Denver, Colorado 80211 The RTO Group, Ltd. ♦ Architects P 303-964-8282 F 303-964-8383 March 16, 2020 Page 2 of 3 Windows opening into the Exercise Room along the West facade ... North fagade is similarly provided with windows of equal height & width to those shown above. 9. City Response: Please clary that the wheelchair access lift is being provided to class room Elementary 1 & 2. Learning Labs are considered part of the primary function and should be along the accessible route. Please clarify in a letter how occupants with a disability will be accommodated. At least one learning Lab shall be along the accessible route and proper signage shall be installed to inform occupants where the accessible learning lab is located. The wheelchair lift will serve Elementary Room 1; Elementary Room 2 is not accessible and the curriculum and age group for the 2 rooms is identical. Accessible toilet facilities for Room 1 are provided by new Toilet Room 138. An accessible learning lab along the accessible route to primary functions, as shown on Sheet A002 is available in Room 106. All service and instruction offered to each age group in any learning lab will be available to any student in Room 106 regardless of age group. Signage for the entire facility will be provided by the owner's independent signage vendor; the Owner has been advised that all signage, including directional signage must be in compliance with ANSI A117.1. 13. Please clarify in the construction documents that service water heating complies with code section C404 of the IECC. The RTO Group, Ltd. 62-213/ ♦ Architects k1r, t M March 16, 2020 Richard E. Teves, Architect The RTO Group, Ltd. 200 Quebec Street, Building 600, Suite 201 Denver, CO 80230 Re: Midtown Montessori Academy 3480 Ames Street Wheat Ridge, CO Dear Rich, This letter is to address the following comment from the plan review of the mechanical drawings for the above-mentioned project: 13. Please clarify in the construction documents that service water heating complies with code section C404 of the IECC. To the best of my knowledge, information and belief, the construction documents comply with Section C404 of the 2012 IECC as adopted by the City of Wheat Ridge. Sincerely, Michael Best, PE 2 RTM Engineering Consultants RTM Engineering Consultants i 3000 Youngfield Street, Suite 105 i Wheat Ridge, CO 80215 rtmassociates.com 1 303.297.1038 1 MBE Certified Business March 16, 2020 Page 3 of 3 Please see attached letter from the mechanical engineer. Please advise that response by letter is sufficient to resolve these issues and/or if you have additional questions. Sincerely: Richard E. Teves, Architect 62-2131 The RTO Group, Ltd. ♦ Architects At March 2, 2020 City of Wheat Ridge — Community Development Building Inspection Services 7500 West 29- Avenue, 2.^ Floor Wheat Ridge, Colorado 80033 RE: Plan Check No: 202000130 3480 Ames Street Wheat Ridge, Colorado Attn: Mr. Kirk Money kdObO130 S/ S-�202o With regard to plan review comments for the subject project, please accept the following: _'T Please define in the construction documents the age groups for infant, toddler and primary. Age group for all students has been added to Sheet A001 Please clarify in the construction documents that the kitchen is compliant as a commercial kitchen or please describe the intent of the kitchen and how it will be used. The existing kitchen area will primarily be used as a Staff break room; the 2 ranges will be removed by the owner. Secondarily, the area will be used by a third -party catering service for organizing snacks & lunches for distribution to the classrooms. All such food is prepared off-site; no food preparation or cooking will be performed within the facility and the room name has been changed to Break Room on the Plans. Please clarify in the construction documents a day care facility thatprovides care for more than five children 2 % years of age or less that each of the classrooms has an exit door directly to the exterior per code section 308.6.1 of the IBC. Each classroom serving students under the age of 2-1/2 yrs. is provided with at least one exit directly to the building exterior. Vestibule 129 has been reconfigured to serve only Rm. 130. Classroom 127 is also reconfigured and a new exterior door has been added from the room. Please clarify that the areas appurtenant to the stage are separated from the stage with a I hr. f re barrier per code section 410.5 of the IBC. The stage area will be used as a secondary indoor exercise area for small groups for basic stretching, yoga and similar activities; a 42" high partition will be constructed across the stage opening to act as a guard for the change in floor height. The rooms appurtenant to the stage area will be used as learning Jabs for computer and similar instruction. A fire barrier is not required between Group A & E uses. 62-2131 The RTO Group, Ltd. ♦ Architects 200 Quebec Street, Building 600, Syite 201 Denver, Colorado 80211 P 303-964-8282 F 303-964-8383 March 2, 2020 Page 2 of 3 5. Please provide in the construction documents details and the listing for opening, penetrations, ducts and transfer openings that penetrate the fire barriers or horizontal assemblies per code section 707 of the IBC. Refer to Wall Section 3/A108 for Section 707 notes & details. IK Please provide a detailed section view of the existing wall that is being proposed as afire barrier to create the fire areas. Include in the section view details showing the structure supporting the fire barrier is compliant with code section 707.5.1 of the IBC. Also, please verb that the existing masonry wall complies with table 721.1(2) and section 722.3 of the IBC. Refer to Wall Section 1, 2, & 3/A108 for Section 707.5.1 and 721, 722 notes & details. --^ 7. Please clarify the access to the basement areas and the means of egress for the lower level storage areas and boiler room. Please demonstrate in the construction documents that the basement areas comply with code section 903.2.11.1.3 of the IBC. Egress path of travel has been added to the basement floor plan. Basement areas are not within the work area and Section 703.1 of the 2012 IEBC is considered to apply to these rooms. `8' Please include in the project data the occupant loads for all areas per table 1004.1.2 of the IBC. Please update the plumbing fixture count per the occupant load and table 2902.1 of the IBC. Occupant load tabulation and fixture count per referenced sections of the IBC has been added to Sheet A001. -- 9. Please demonstrate in the construction documents that this building is compliant with code section 3411.4.2 of the IBC. An Accessibility Plan demonstrating compliance with the referenced section has been added to Sheet A002. d-6.'Please demonstrate that the kitchen is accessible and compliant with ICC a117.1-2009. As discussed under Item 2 above, the Kitchen will be used as a Break Room; accessible clearances at doors and fixtures in the room have been added to the Floor Plan. X1'1. Please clarify that the children's restroom are compliant with ICC A117.1-2009. Water closest shall comply with figure 604.11.2 & figure 604.11.4. Dispenser shall comply with figure 604.11.7 and grab bars shall comply with figure 609.4.2. The RTO Group, Ltd. Architects 62-2131 March 2, 2020 Page 3 of 3 Refer to Detail 4/A 107 for revised dimensions illustrating compliance with the referenced section. Please demonstrate in the construction documents that the laundry room is accessible and compliant with code section 611.1 of the ICC A117.1-2009 Accessible clearances for doors & equipment have been added to the Floor Plan. 13. Please clarify in the construction documents that service water heating complies with code section C404 of the IECC. To be addressed under separate cover by the Mechanical Engineer. Sincerely: Richard E. Teves, Architect 62-2131 The RTO Group, Ltd. ♦ Architects If 2 DS Environmental CONSULTING "The trusted choice for your environmental & industrial hygiene needs." ASBESTOS PCM CLEARANCE REPORT PRESENTED TO: Mr. Matt Peterson Colorado Hazard Control 1775 W. 55th Ave. Denver, CO 80221 303-412-8575 mpeterson(c@coloradohazard.com Front Range 7555 W 101h Ave Suite A, Lakewood, CO 80214 Midtown Montessori Academy 3480 Ames St, Wheat Ridge, Colorado INSPECTED BY: Pierce Gladfelter DS Environmental Cell: (303) 881-5330 Mountains PO Box 6864 Avon, CO 81620 PROJECT DETAILS: DS Job Number: 20584 Date of Inspection: December 19, 2019 CHC Job # 291-A19P Western Slope PO Box 3793 Aspen, CO 81612 Web dsconsultinginc.com Direct (303) 286-9094 Fax (303) 986-0121 Table of Contents 1.0 Introduction 2.0 Project Details 3.0 Certifications 4.0 Final Visual & Final Clearance Procedures 5.0 Air Sample Analyzation 6.0 Air Sample Results 7.0 Copyright Notice APPENDIX A CERTIFICATIONS 1.0 Introduction Mr. Pierce Gladfelter with DS Environmental (DS) conducted a final visual inspection, performed aggressive clearance air monitoring, and analyzed clearance air quality samples via Phase Contrast Microscopy (PCM) for a - fully permitted asbestos abatement project being conducted to remove asbestos -containing materials (ACM) from the commercial building detailed on the cover page of this report. The asbestos abatement was being conducted to remove —240 sf of asbestos -containing ceiling the mastic from the room south relative to the basketball court. The abatement project passed the final visual inspection and the analytical results of all final clearance samples collected were below the CDPHE's clearance criteria of 0.01 fibers/cubic centimeter (f/cc). The containment area can be deconstructed, and the abatement area can be re -occupied. 2.0 Project Details 3 GAC & Permit General Abatement Contractor (GAC) Colorado Hazard Control (CHC) GAC Supervisor Edward Holmes CDPHE Permit Number 191E725IN Containment Details Number of Containments 1 Containment Type(s) Secondary Containment Containment Area(s) Room South Relative to Basketball Court Analyzation Details Sample Analyzation Method Phase Contrast Microscopy (PCM) Analyzation Method NIOSH 7400 Number of Samples Collected 5 Number of Blank Samples Collected 2 Asbestos -Containing Materials Abated Type of ACM Quantity Removed Location Removed From Ceiling Tile Mastic —240 sf Room south relative to basketball court, ceiling 3 3.0 Certifications The final visual inspection, the aggressive clearance air monitoring, and the PCM air sample analyzation were conducted by Mr. Pierce Gladfelter with DS. Mr. Gladfelter is a CDPHE certified Air Monitoring Specialist (AMS); having certification number 25401 and a NIOSH 582 certified analyst. DS is a CDPHE certified Asbestos Consulting Firm, Registration No. 14912 and a participant in the Industrial Hygiene Proficiency Analytical Testing (IHPAT) program with laboratory ID No. 188987 maintaining a rating of Proficient. 4.0 Final Visual & Final Clearance Procedures Prior to the collection of final clearance air samples, a final visual inspection was conducted to ensure all the requirements of CDPHE's Regulation 8, Part B — Asbestos were met. Once the abatement area passed the final visual inspection, DS collected final clearance air samples from five (5) locations within the containment. Following the collection of the final clearance air samples, the samples were analyzed, along with sample blanks, to determine the airborne fiber concentrations. The air samples were collected at an average flow rate of less than 16.0 liters per minute (L/m) using Thomas high-volume pumps with a minimum volume of air to meet the analytical sensitivity for the NIOSH 7400 analyzation method used to analyze the samples. Flow rates were collected at the beginning and at the end of the sampling period utilizing an airflow rotameter calibrated against a primary -flow calibration instrument. Start times and stop times were recorded for all sampling periods. 5.0 Air Sample Analyzation The final clearance PCM samples were collected on 25 -millimeter (mm) mixed -cellulose, ester -membrane filters with a 0.8 -micron pore size and an effective collection area of 385 mm. All filters were pre -assembled by the manufacturer in three -stage, conductive sampling cassettes with extension cowls. A field blank and lab blank were also collected and analyzed along with the clearance samples. The final clearance PCM samples were analyzed according to the NIOSH 7400 Method. This method counts and identifies "fibers" that meet the counting criteria for the method, which is not specific to asbestos fibers; therefore, all fibers that meet the counting criteria are counted as asbestos fibers. If the total fiber count is less than 0.01 fibers/cubic centimeter (f/cc), it is known that the total asbestos fiber count is also less than 0.01 fibers/cubic centimeter (f/cc). 4 6.0 Air Sample Results Clearance Sample Avg Flow Time Volume Fibers/ Reporting I Results PASS/ Sample ID Location Rate (liters) (min) (liters) 100 Fields, Limit (f/cc) (f/ccj* FAIL 1080-1798 Room south relative to 1799-5400 .001 CLI basketball court, N side 15 83 1245 1.0 0.002 BRL PASS Room south relative to CL2 basketball court, E side 15 83 1245 1.5 0.002 BRL PASS Room south relative to CL3 basketball court, S side 15 85 1275 2.5 0.002 BRL PASS Room south relative to CL4 basketball court, W side 15 85 1275 1.5 0.002 BRL PASS Room south relative to CL5 basketball court, center 15 86 1290 0.5 0.002 BRL PASS --)ample anarysis nas peen oianK correccea Blank Sample Fibers/ Sample ID Description 100 Fields LB Lab Blank 0 FB Field Blank 0 7.0 Copyright Notice Legend Reporting Limit (RL") Volume (liters) Reporting Limit BRL = Below Reporting Limit 490 .006 CBR = Cannot Be Read 491-599 .005 Min = Minutes 600-770 .004 RL = Reporting Limit 771-1079 .003 f/cc = fibers per cm3 1080-1798 .002 1799-5400 .001 © DS Environmental 2019. All Rights Reserved. This document contains material protected under Federal Copyright Laws. No part of this document or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author and DS Environmental. 5 APPENDIX A: CERTIFICATIONS no # �: lNiViiUU Dt�attment C Y '� `" afj�si�ckirslch �- rs " ASBESTOS CERTIFICATION* —� L 4 s g a W This certifies that " Pierce Glatifelter % g • - Certification No.: 25401 �' ;� t a � � ¢ � �, +�. .� * � } has met the requirements of' -7-507, CRS, acre! Air Quality Caotrvl 3 Commission Regulation No. 8, Part H, and is hereby certified by the . o' „ y O state ofColorada in the following disci line:Ic Air MonitoringSpecialist* jk u {` \ �:. Issued: Mayo?, 2019 L? iyj i:zpires: May 02v 21120 w.r.. wxdws.aa re,pxr:rrxax •X> ' � � 0 � 5. �::agrt L �y�^, � arras AMS Certification: 25401 Firm Certification: 14912 z 0 r � tv C^� x mi n > c r c Q Ef r w Gf 3 ? £ c 0 n Z +4\ x? p '+� y " ) i �.,. G e� L Eli s >n NIOSH 582E Lab Certification: 14912 U COMcheck Software Version 4.1.1.0 Interior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Construction Site: Wheat Ridge, IL 2012 IECC Montessori School Alteration Owner/Agent: Allowed Interior Lighting Power A Area Category a� PE.0043682, RTM Engineering Consultants 650 E. Algonquin Road Suite 250 Schamburg, IL 60173 847.756.4180 B C D Floor Area Allowed Allowed Watts (ft 2) Watts / ft2 (B X C) 1 -Common Space Types:Classroom / Lecture / Training 7440 1.30 9672 Total Allowed Watts = 9672 Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Common Space Types: Classroo m/Lectu re/Trai n i ng (7440 sq.ft.) LED: F1: 2x4 Fixture: Other: 1 90 45 4050 LED: F1 A: 2x2 Fixture: Other: 1 14 30 420 LED: F2: Recessed Downlight Fixture: Other: 1 1 40 40 LED: F3: Wall Vanity Fixture: Other: 1 1 20 20 Total Proposed Watts = 4530 Intaorinr Linhtinn PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspectign Checklist. , _ —_-� me - Ti re Iz12 Date Project Title: Montessori School Report date: 12/20/19 Data filename: H:\_2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 1 of 6 COMcheck Software Version 4.1.1.0 Inspection Checklist Energy Code: 2012 IECC Requirements: 75.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # & Req.ID Plan Review Complies? Comments/Assumptions C103.2 Plans, specifications, and/or❑Complies [PR4]1 calculations provide all information '❑Does Not ;with which compliance can be ❑Not Observable determined for the interior lighting and electrical systems and equipment !❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and ,control devices. Additional Comments/Assumptions: 111 High Impact (Tier 1) 1 2 1 Medium Impact (Tier 2) 1 3 1 Low Impact (Tier 3) Project Title: Montessori School Report date: 12/20/19 Data filename: H:\-2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 2 of 6 Section # Rough -in Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.2. ;Automatic controls to shut off all ;❑Complies :Requirement will be met. 1 building lighting installed in all �❑Does Not [EL22]2 ;buildings. ;Location on plans/spec: E200,E201 ❑Not Observable: ❑Not Applicable C405.2.1. :Independent lighting controls installed ;❑Complies ; Requirement will be met. 1 per approved lighting plans and all E❑Does Not [EL23]2 manual controls readily accessible and:❑Not Observable: on plans/spec: E200,E201 visible to occupants. , ❑Not Applicable C405.2.1. Lighting controls installed to uniformly ;❑Complies :Exception: Areas that are controlled by an occupancy sensor. 2 � reduce the lighting load by at least T❑Does Not [EL15]1 50%'❑Not Observable i Location on plans/spec: E200,E201 i ;❑Not Applicable C405.2.2. Daylight zones provided with ;❑Complies ; Requirement will be met. 3 :individual controls that control the �❑Does Not [EL16]2 ; lights independent of general area s❑Not Observable � Location on plans/spec: E200,E201 lighting. ; ❑Not Applicable 3 C405.2.3 'Sleeping units have at least one ;❑Complies ;Exception: Requirement does not apply. [EL17]3 i master switch at the main entry door ❑Does Not ;that controls wired luminaires and UNot Observable: f switched receptacles. ❑Not Applicable C405.2.2. Occupancy sensors installed in ;❑Complies ; Requirement will be met. 2 required spaces. ;❑Does Not [EL18]1 '❑Not Location on plans/spec: E200,E201 Observable; ❑Not Applicable C405.2.2. ; Primary sidelighted areas are ;❑Complies :Exception- Requirement does not apply. 3 :equipped with required lighting a❑Does Not [EL20]1 ;controls. :❑Not Observable' ❑Not Applicable C405.2.2. ; Enclosed spaces with daylight area ;❑Complies ;Exception: Requirement does not apply. 3 i under skylights and rooftop monitors s❑Does Not [EL21]1 ;are equipped with required lighting '❑Not Observable 3 ;controls. ❑Not Applicable ; C405.2.3 ;Separate lighting control devices for ;❑Complies ;Requirement will be met. [EL4]1 !specific uses installed per approved E❑Does Not lighting plans. ❑Not Observable:Location on plans/spec: E200,E201 ❑Not Applicable C405.3 ; Fluorescent luminaires with odd ;❑Complies Exception: Requirement does not apply. [EL19]3 numbered lamp configurations that :❑Does Not :are within 10 feet center to center (if ❑Not Observable:Location on plans/spec: E200,E201 recess mounted) or are within 1 foot , edge to edge (if pendant or surface ;❑Not Applicable mounted) shall be tandem wired. C405.4 ; Exit signs do not exceed 5 watts per ;❑Complies _ :Requirement will be met. [EL6]1 face.❑Does Not ;❑Not Location on plans/spec: E000 Observable ; I ❑Not Applicable C405.2.3 ;Additional interior lighting power ;❑Complies _ ;Requirement will be met. [EL8]1 allowed for special functions per the :❑Does Not approved lighting plans and is Location on plans/spec: E200,E201 Observable automatically controlled and �❑Not !separated from general lighting. ;❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Montessori School Report date: 12/20/19 Data filename: H:\_2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 3 of 6 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Montessori School Report date: 12/20/19 Data filename: H:\_2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 4 of 6 Section # Final Inspection Complies? Comments/Assumptions & Recl.ID C408.2.5. Furnished as -built drawings for ❑Complies 1 electric power systems within 30 days E❑Does Not [F116]3 i:of system acceptance. ,❑Not Observable ❑Not Applicable C303.3, Furnished O&M instructions for ;❑Complies C408.2.5. systems and equipment to the :❑Does Not 2 :building [F117]3; owner or designated representative. UNot Observable ❑Not Applicable C405.5.2 ; Interior installed lamp and fixture ;❑Complies ;See the Interior Lighting fixture schedule for values. [F118]1 ; lighting power is consistent with what ❑Does Not is shown on the approved lighting ❑Not Observable plans, demonstrating proposed watts are less than or equal to allowed ',❑Not Applicable watts. C408.3 ',Lighting systems have been tested to ;❑Complies [F133]1 :ensure proper calibration, adjustment, o❑Does Not :programming, and operation. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 1 3 1 Low Impact (Tier 3) Project Title: Montessori School Report date: 12/20/19 Data filename: H:\_2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 5 of 6 Project Title: Montessori School Report date: 12/20/19 Data filename: H:\ 2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 6 of 6 6�( COMcheck Software Version 4.1.1.0 Mechanical Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: W Zozo An/3t, 2012 IECC FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Wheat Ridge, Colorado 5b Alteration T� Construction Site: Owner/Agent: Designer/Contractor: 3480 AMES STREET THE RTO GROUP (-j��—�-Z RSM ENGINEERING CONSULTANTS WHEAT RIDGE, CO DENVER, CO �--=— HEAT RIDGE, CO Mechanical Systems List (quantity System Type & Description 1 F1-CU1 (Single Zone): Heating: 1 each - Central Furnace (F1), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU1), Capacity = 36 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency= 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 1 1 F1 -- Compliance (Motor nameplate HP method) : Passes Fans: BF1 Supply, Constant Volume, 1000 CFM, 0.5 motor nameplate hp 1 F2-CU2 (Single Zone): Heating: 1 each - Central Furnace (172), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU2), Capacity = 36 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency= 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 2 1 F2 -- Compliance (Motor nameplate HP method) : Passes Fans: BF2 Supply, Constant Volume, 1025 CFM, 0.5 motor nameplate hp 1 F3-CU3 (Single Zone): Heating: 1 each - Central Furnace (F3), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU3), Capacity = 36 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 31 F3 -- Compliance (Motor nameplate HP method) : Passes Fans: BF3 Supply, Constant Volume, 1000 CFM, 0.5 motor nameplate hp 1 F4-CU4 (Single Zone): Heating: 1 each - Central Furnace (174), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU4), Capacity = 36 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency= 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 4 1 F4 -- Compliance (Motor nameplate HP method) : Passes Fans: BF4 Supply, Constant Volume, 1000 CFM, 0.5 motor nameplate hp 1 F5-CU5 (Single Zone): Heating: 1 each - Central Furnace (F5), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 1 of 13 Quantity System Type & Description Cooling: 1 each - Split System (CU5), Capacity = 36 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 51 F5 -- Compliance (Motor nameplate HP method) : Passes Fans: BF5 Supply, Constant Volume, 1025 CFM, 0.5 motor nameplate hp 1 F6-CU6 (Single Zone): Heating: 1 each - Central Furnace (F6), Gas, Capacity = 88 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU6), Capacity = 48 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency= 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 6 1 F6 -- Compliance (Motor nameplate HP method) : Passes Fans: BF6 Supply, Constant Volume, 1335 CFM, 0.8 motor nameplate hp 1 F7-CU7 (Single Zone): Heating: 1 each - Central Furnace (F7), Gas, Capacity = 110 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU7), Capacity = 60 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency= 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 71 F7 -- Compliance (Motor nameplate HP method) : Passes Fans: BF7 Supply, Constant Volume, 1685 CFM, 1.0 motor nameplate hp 1 WH1: Gas Storage Water Heater, Capacity: 100 gallons, Input Rating: 199 kBtu/h w/ Circulation Pump Proposed Efficiency: 80.00 % Et, Required Efficiency: 80.00 % Et Mechanical Compliance Statement Compliance Statement. The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. cjwd -PF Name Title laz Signdt'Q Date 28309QONN- Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 2 of 13 COMcheck Software Version 4.1.1.0 Inspection Checklist Energy Code: 2012 IECC Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # & Req.ID Plan Review Complies? Comments/Assumptions C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR2)1 calculations provide all information ❑Does Not document where exceptions to the with which compliance can be ❑Not Observable determined for the mechanical systems and equipment and ❑Not Applicable sizing guide. document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR3)1 calculations provide all information []Does Not with which compliance can be ❑Not Observable determined for the service water ❑Not Applicable heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Additional Comments/Assumptions: 11 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 3 of 13 Section # Footing / Foundation Inspection Complies? Comments/Assumptions & Rea.ID C403.2.4. Freeze protection and snow/ice ❑Complies Requirement will be met. 5 melting system sensors for future ]Does Not [F09]3 connection to controls. ❑Not Observable ❑Not Applicable j Additional Comments/Assumptions: 1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 4 of 13 Section # & Req.ID Plumbing Rough -in Inspection Complies? Comments/Assumptions C404.3 Temperature controls installed on ❑Complies Requirement will be met. [PL5]3 service water heating systems (110 F []Does Not for dwelling units and lavatories in ❑Not Observable public restrooms and 90 F for other ❑Not Applicable occupancies.) C404.4 Automatic time switches installed to ❑Complies Requirement will be met. [PL3]i automatically switch off the ❑Does Not recirculating hot-water system or heat ❑Not Observable trace. ❑Not Applicable Additional Comments/Assumptions: 11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 5 of 13 Section # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Req.ID C403.2.3 HVAC equipment efficiency verified. ❑Complies See the Mechanical Systems list for values. [ME55]2 ❑Does Not ❑Not Observable ❑Not Applicable C403.2.5. Demand control ventilation provided ❑Complies Exception: Systems with design outdoor air of less than 1200 1 for spaces >500 sq.ft. and >25 ❑Does Not cfm. [ME59]1 people/1000 sq.ft. occupant density ❑Not Observable and served by systems with air side ❑Not Applicable economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. C403.2.7 HVAC ducts and plenums insulated. ❑Complies Requirement will be met. [ME60]2 Where ducts or plenums are installed ❑Does Not in or under a slab, verification may need to occur during Foundation ❑Not Observable Inspection. ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur []Not Observable during Foundation Inspection. ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur during Foundation Inspection. ❑Not Observable ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur ❑Not Observable during Foundation Inspection. ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur during Foundation Inspection. ❑Not Observable ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. (ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur during Foundation Inspection. []Not Observable ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur during Foundation Inspection. ❑Not Observable ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur during Foundation Inspection. ❑Not Observable []Not Applicable C403.2.8. Piping Insulation exposed to weather ❑Complies Requirement will be met. 1 is protected from damage (due to sun, ❑Does Not [ME7]3 moisture, wind, etc.). ❑Not Observable ❑Not Applicable 0403.2.8 'Thermally ineffective panel surfaces of❑Complies Exception: Requirement does not apply. [ME41]3 sensible heating panels have ❑Does Not insulation >= R-3.5. ❑Not Observable ❑Not Applicable 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 6 of 13 Section # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Req.ID C403.2.7 Ducts and plenums sealed based on ❑Complies Requirement will be met. [ME10]2 static pressure and location. ❑Does Not ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 []Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable []Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME1113 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable []Not Applicable C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for []Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, 'Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. 1 I High Impact (Tier 1) 2 1 Medium Impact (Tier 2)--- F3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 7 of 13 Section # Mechanical Rough-In Inspection Complies? Comments/Assumptions & Req.ID IC403.3.1, Air economizers provided where ❑Complies Requirement will be met. ,C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high-limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high-limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high-limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high-limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C408.2.2. Air outlets and zone terminal devices ❑Complies Requirement will be met. 1 have means for air balancing. ❑Does Not [ME53]3 ❑Not Observable ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. []Not Applicable 11 High Impact (Tier 1) 2 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 8 of 13 Section # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Req.ID C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.2.6 Exhaust air energy recovery on ❑Complies Exception: Requirement does not apply. [ME57]1 systems meeting Table C403.2.6 ❑Does Not ❑Not Observable ❑Not Applicable C403.2.11 Unenclosed spaces that are heated ❑Complies Exception: Requirement does not apply. [ME71]2 use only radiant heat. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 9 of 13 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [F147]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [F147]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not (FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device ❑ Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. 'Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Thermostatic controls have a 5 °F ❑Complies Requirement will be met. 2 deadband. ❑Does Not [FI38]3 ❑Not Observable ❑Not Applicable C403.2.4. Temperature controls have setpoint ❑Complies Requirement will be met. 2 overlap restrictions. ❑Does Not [FI20]3 ❑Not Observable ❑Not Applicable C403.2.4. Each zone equipped with setback ❑Complies Requirement will be met. 3 controls using automatic time clock or ❑Does Not [FI39]3 programmable control system. ❑Not Observable ❑Not Applicable C403.2.4. `Automatic Controls: Setback to 55°F ❑Complies Requirement will be met. 3 ; (heat) and 85°F (cool); 7 -day clock, 2- ❑Does Not [F140]3 hour occupant override, 10 -hour ❑Not Observable 'backup ❑Not Applicable 1 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 10 of 13 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C403.2.4.: Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [F141]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C408.2.5. Furnished HVAC as -built drawings ❑Complies Requirement will be met. 1 submitted within 90 days of system ❑Does Not [FI7]3 acceptance. ❑Not Observable ❑Not Applicable C303.3, Furnished O&M manuals for HVAC ❑Complies Requirement will be met. C408.2.5. 'systems within 90 days of system ❑Does Not 3 [FIB]3 acceptance. ❑Not Observable ❑Not Applicable C408.2.5. An air and/or hydronic system ❑Complies Requirement will be met. 3 balancing report is provided for HVAC ❑Does Not [FI43]1 systems. ❑Not Observable ❑Not Applicable C408.2.3. HVAC control systems have been ❑Complies Requirement will be met. 2 tested to ensure proper operation, ❑Does Not [F[10]1 calibration and adjustment of controls. ❑Not Observable ❑Not Applicable C404.3 Public lavatory faucet water ❑Complies Requirement will be met. [FI11]3 temperature <=110°F. ❑Does Not ❑Not Observable ❑Not Applicable C404.5 All piping in circulating system ❑Complies Requirement will be met. [FI25]2 insulated ❑Does Not ❑Not Observable ❑Not Applicable 11 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: HARTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 11 of 13 Section -7 # Final Inspection Complies? Comments/Assumptions & Req.ID iC404.6 'Controls are installed that limit the ❑Complies Requirement will be met. [FI12]3 operation of a recirculation pump ❑Does Not installed to maintain temperature of a ❑Not Observable storage tank. ❑Not Applicable C403.2.2 HVAC systems and equipment ❑Complies Requirement will be met. (FI27]3 capacity does not exceed calculated ❑Does Not loads. ❑Not Observable ❑Not Applicable C408.2.1 Commissioning plan developed by ❑Complies Requirement will be met. [FI28]1 registered design professional or []Does Not approved agency. ❑Not Observable ❑Not Applicable C408.2.4 Preliminary commissioning report ❑Complies Requirement will be met. [F129]1 completed and certified by registered ❑Does Not design professional or approved ❑Not Observable agency. ❑Not Applicable C408.2.5. Final commissioning report due to ❑Complies Requirement will be met. 4 building owner within 90 days of []Does Not [F130]1 receipt of certificate of occupancy. ❑Not Observable ❑Not Applicable C408.2.3. HVAC equipment has been tested to ❑Complies Requirement will be met. 1 ensure proper operation. ❑Does Not [FI31]1 ❑Not Observable ❑Not Applicable C408.2.3. Economizers have been tested to ❑Complies Requirement will be met. 3 ensure proper operation. ❑Does Not [FI32]1 ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: I 1 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 12 of 13 Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 13 of 13 U COMcheck Software Version 4.1.1.0 Interior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Construction Site: Wheat Ridge, IL ##26 700013 v 2012 IECC Montessori School Alteration Owner/Agent: H(FR, Allowed Interior Lighting Powers=1 J RTM Engineering Consultants 650 E. Algonquin Road Suite 250 Schamburg, IL 60173 847.756.4180 A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B X C) 1 -Common Space Types:Classroom / Lecture / Training 7440 1.30 9672 Total Allowed Watts = 9672 Proposed Interior Lighting Power _ A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Common Space Types:Classroom/Lecture/Training (7440 sq ft ) LED: F1: 2x4 Fixture: Other: 1 90 45 4050 LED: F1 A: 2x2 Fixture: Other: 1 14 30 420 LED: F2: Recessed Downlight Fixture: Other: 1 1 40 40 LED: F3: Wall Vanity Fixture: Other: 1 1 20 20 Total Proposed Watts = 4530 Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable m ndatory requirements listed in the ln5npc ion C 1I 1 G ame -Title X Signature Date Project Title: Montessori School Repo di12 9 Data filename: H:\_2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Paqe of 6 COMcheck Software Version 4.1.1.0 Inspection Checklist Energy Code: 2012 IECC Requirements: 75.0% were addressed directly in tf e-'COMcheek software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # & Req ID Plan Review Complies? Comments/Assumptions C103.2 Plans, specifications, and/or ❑Complies [PR4]1 :calculations provide all information ❑Does Not with which compliance can be ❑Not Observable determined for the interior lighting ❑Not Applicable and electrical systems and equipment !,and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Additional Comments/Assumptions: ,A 11 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Montessori School Report date: 12/20/19 Data filename: H:\-2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 2 of 6 Section # Rough-in Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.2. 'Automatic controls to shut off all ;❑Complies ;Requirement will be met. 1 ' building lighting installed in all :❑Does Not [EL22]2 buildings. :Location on plans/spec: E200,E201 ❑Not Observable ❑Not Applicable C405.2.1. Independent lighting controls installed ;❑Complies ; Requirement will be met. 1 per approved lighting plans and all :❑Does Not : [EL23]2 manual controls readily accessible and; :Location on plans/spec: E200,E201 Observable visible to occupants. ;❑Not ❑Not Applicable C405.2.1. Lighting controls installed to uniformly ;❑Complies ; Exception: Areas that are controlled by an occupancy sensor. 2 :reduce the lighting load by at least a❑Does Not [EL15]1 ;50%. Location on plans/spec: E200,E201 ❑Not Observable ❑Not Applicable : C405.2.2. Daylight zones provided with ;❑Complies :Requirement will be met. 3 individual controls that control the �❑ Does Not [EL16]2 :lights independent of general area:❑Not Location on plans/spec: E200,E201 Observable: lighting. , ❑Not Applicable C405.2.3 :Sleeping units have at least one ';❑Complies :Exception: Requirement does not apply. [EL17]3 master switch at the main entry door :❑Does Not : ;that ;switched controls wired luminaires and ❑Not Observable; receptacles. ❑Not Applicable a C405.2.2. Occupancy sensors installed in ;❑Complies 'Requirement will be met. 2 required spaces. ❑Does Not [EL18]1 : Location on plans/spec: E200,E201 ❑Not Observable :❑Not Applicable C405.2.2. ;Primary sidelighted areas are ;❑Complies ;Exception: Requirement does not apply. 3 :equipped with required lighting ;❑Does Not [EL20]1 controls. ❑Not Observable ❑Not Applicable C405.2.2. ; Enclosed spaces with daylight area ;❑Complies ; Exception: Requirement does not apply. 3 : under skylights and rooftop monitors :❑Does Not : [EL21]1 ;are equipped with required lighting : ;❑Not Observable controls. ❑Not Applicable C405.2.3 i Separate lighting control devices for ;❑Complies ;,Requirement will be met. [EL4]1 :specific uses installed per approved ❑Does Not ;lighting plans. Location on plans/spec: E200,E201 ❑Not Observable ❑Not Applicable C405.3 ;Fluorescent luminaires with odd ',❑Complies ,Exception: Requirement does not apply. [EL19]3numbered lamp configurations that :❑Does Not are within 10 feet center to center (if❑Not Observable! Location on plans/spec: E200,E201 ;recess mounted) or are within 1 foot ❑Not Applicable :edge to edge (if pendant or surface pP mounted) shall be tandem wired. C405.4 Exit signs do not exceed 5 watts per❑Complies Requirement will be met. [EL6]1 face. ;❑Does Not : ❑Not Observable:Location on plans/spec: E000 ❑Not Applicable C405.2.3 ;Additional interior lighting power ;❑Complies ,Requirement will be met. [EL8]1 :allowed for special functions per the j❑Does Not ;approved lighting plans and is I :Location on plans/spec: E200,E201 UNot Observable automatically controlled and separated from general lighting. ;❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Montessori School Report date: 12/20/19 Data filename: H:\_2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 3 of 6 I I High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Montessori School Report date: 12/20/19 Data filename: H:\ 2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENE RGY\COMcheck. cck Page 4 of 6 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C408.2.5. ',Furnished as -built drawings for ❑Complies 1 ;electric power systems within 30 days :❑Does Not [FI16]3 :of system acceptance. ;❑Not Observable ❑Not Applicable C303.3, Furnished O&M instructions for I❑Complies C408.2.5. systems and equipment to the E❑Does Not 2 ; [FI17]3 building owner or designated representative. i❑Not Observable ;❑Not Applicable C405.5.2 ' Interior installed lamp and fixture ;❑Complies ;See the Interior Lighting fixture schedule for values. [F118]1 :lighting power is consistent with what ;❑Does Not j is shown on the approved lighting ; ❑Not Observable j plans, demonstrating proposed watts ;❑Not 3 Applicable are less than or equal to allowed watts. C408.3 ;Lighting systems have been tested to ;❑Complies [FI33]1 ensure proper calibration, adjustment, :❑Does Not ,programming, and operation. ❑Not Observable , ❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Montessori School Report date: 12/20/19 Data filename: H:\_2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 5 of 6 Project Title: Montessori School Report date: 12/20/19 Data filename: H:\ 2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 6 of 6 COMcheck Software Version 4.1.1.0 Mechanical Compliance Certificate 4f 202. 0 aOM6 Project Information Energy Code: 2012 IECC Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Location: Wheat Ridge, Colorado Climate Zone: 5b Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 3480 AMES THE RTO WHEAT RISTREET DGE, CODENVER, COO p WHEAT RIDGE, RTM ICO NG CONSULTANTS Mechanical Systems List,ZO (quantity System Type & Description 1 F1-CU1 (Single Zone): Heating: 1 each - Central Furnace fl), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU1), Capacity = 36 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency= 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 1 1 F1 -- Compliance (Motor nameplate HP method) : Passes Fans: BF1 Supply, Constant Volume, 1000 CFM, 0.5 motor nameplate hp F2-CU2 (Single Zone): Heating: 1 each - Central Furnace (F2), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU2), Capacity = 36 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 21 F2 -- Compliance (Motor nameplate HP method) : Passes Fans: BF2 Supply, Constant Volume, 1025 CFM, 0.5 motor nameplate hp F3-CU3 (Single Zone): Heating: 1 each - Central Furnace (F3), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU3), Capacity = 36 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency= 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 31 F3 -- Compliance (Motor nameplate HP method) : Passes Fans: BF3 Supply, Constant Volume, 1000 CFM, 0.5 motor nameplate hp F4-CU4 (Single Zone): Heating: 1 each - Central Furnace (F4), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU4), Capacity = 36 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency= 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 4 1 F4 -- Compliance (Motor nameplate HP method) : Passes Fans: BF4 Supply, Constant Volume, 1000 CFM, 0.5 motor nameplate hp F5-CU5 (Single Zone): Heating: 1 each - Central Furnace (F5), Gas, Capacity ty = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Q� Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report dat . Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 1 of 13 Quantity System Type & Description Cooling: 1 each - Split System (CU5), Capacity = 36 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 51 F5 -- Compliance (Motor nameplate HP method) : Passes Fans: BF5 Supply, Constant Volume, 1025 CFM, 0.5 motor nameplate hp F6-CU6 (Single Zone): Heating: 1 each - Central Furnace (F6), Gas, Capacity = 88 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU6), Capacity = 48 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 6 1 F6 -- Compliance (Motor nameplate HP method) : Passes Fans: BF6 Supply, Constant Volume, 1335 CFM, 0.8 motor nameplate hp F7-CU7 (Single Zone): Heating: 1 each - Central Furnace (F7), Gas, Capacity = 110 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU7), Capacity = 60 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 7 1 F7 -- Compliance (Motor nameplate HP method) : Passes Fans: BF7 Supply, Constant Volume, 1685 CFM, 1.0 motor nameplate hp WH1: Gas Storage Water Heater, Capacity: 100 gallons, Input Rating: 199 kBtu/h w/ Circulation Pump Proposed Efficiency: 80.00 % Et, Required Efficiency: 80.00 % Et Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4. requirements/ listed in the Inspection Checklist. o comply with any applicable mandatory Pr ?' - - - Name Title _, E <Z/, G 28309 Fs'S��NAL EN�'� D/ Date Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat RReport date: 12/30/19 D;,4 ge\E - Engineering Design Files\COMCHECK.c Page 2 of 13 COMcheck Software Version 4.1.1.0 Inspection Checklist Energy Code: 2012 IECC Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. # Plan Review Complies? & Rea .113 Comments/Assumptions IC103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR2]1 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable determined for the mechanical ❑Not Applicable systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR3]1 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable determined for the service water heating systems and equipment and ❑Not Applicable document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Additional Comments/Assumptions: 1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 3 of 13 Section # Footing / Foundation Inspection Complies? Comments/Assumptions & Rea.ID C403.2.4. Freeze protection and snow/ice ❑Complies Requirement will be met. 5 melting system sensors for future ❑Does Not [F09]3 connection to controls. ❑Not Observable []Not Applicable Additional Comments/Assumptions: 11 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 4 of 13 # & Req.ID Plumbing Rough -In Inspection Complies? Comments/Assumptions C404.3 Temperature controls installed on ❑Complies Requirement will be met. [PL5]3 service water heating systems (110 F ❑Does Not for dwelling units and lavatories in ❑Not Observable public restrooms and 90 F for other ❑Not Applicable occupancies.) C404.4 Automatic time switches installed to ❑Complies Requirement will be met. [PL3]1 automatically switch off the ❑Does Not recirculating hot-water system or heat []Not Observable trace. ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 5 of 13 Section # Mechanical Rough-In Inspection Complies? Comments/Assumptions & Req.ID C403.2.3 HVAC equipment efficiency verified. ❑Complies See the Mechanical Systems list for values. [ME55]2 ❑Does Not j ❑Not Observable ❑Not Applicable C403.2.5. Demand control ventilation provided ❑Complies Exception: Systems with design outdoor air of less than 1200 1 for spaces >500 sq.ft. and >25 []Does Not cfm. [ME59]1 people/1000 sq.ft. occupant density ❑Not Observable and served by systems with air side economizer, auto modulating outside ❑Not Applicable air damper control, or design airflow >3,000 cfm. C403.2.7 HVAC ducts and plenums insulated. ❑Complies Requirement will be met. [ME60]2 Where ducts or plenums are installed ❑Does Not in or under a slab, verification may ❑Not Observable need to occur during Foundation Inspection. ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur ❑Not Observable during Foundation Inspection. ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur ❑Not Observable ( during Foundation Inspection. ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur ❑Not Observable during Foundation Inspection. ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur ❑Not Observable during Foundation Inspection. ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur ❑Not Observable during Foundation Inspection. ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur ❑Not Observable during Foundation Inspection. ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur ❑Not Observable during Foundation Inspection. ❑Not Applicable C403.2.8. Piping Insulation exposed to weather ❑Complies Requirement will be met. 1 is protected from damage (due to sun, ❑Does Not [ME7]3 moisture, wind, etc.). ❑Not Observable ❑Not Applicable C403.2.8 Thermally ineffective panel surfaces of ❑Complies Exception: Requirement does not apply. [ME41]3 sensible heating panels have ❑Does Not insulation >= R-3.5. ❑Not Observable ❑Not Applicable ! 1 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: HARTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 6 of 13 Section # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Req.ID C403.2.7 Ducts and plenums sealed based on ❑Complies Requirement will be met. [ME10]2 static pressure and location. ❑Does Not ❑Not Observable ❑Not Applicable C403.2J. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [MEll]3 ❑Not Observable ❑Not Applicable C403.2J. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [MEll]3 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable ❑Not Applicable 0403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.2J. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. 1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 7 of 13 Section # 1 & Req.ID Mechanical Rough -In Inspection Complies? Comments/Assumptions ;C403.3.1, Air economizers provided where ❑Complies Requirement will be met. iC403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not i 1 [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. 0408.2.2. Air outlets and zone terminal devices ❑Complies Requirement will be met. 1 have means for air balancing. ❑Does Not [ME53]3 ❑Not Observable ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or [-]Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 8 of 13 Section # Mechanical Rough-In Inspection Complies? Comments/Assumptions & Req.ID C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or have controls to limit fan motor ❑Not Observable demand. ❑Not Applicable C403.2.6 Exhaust air energy recovery on ❑Complies Exception: Requirement does not apply. [ME57]1 systems meeting Table C403.2.6 ❑Does Not ❑Not Observable ❑Not Applicable C403.2.11 Unenclosed spaces that are heated ❑Complies Exception: Requirement does not apply. [ME71]2 use only radiant heat. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 9 of 13 Section # Final Inspection fies?T Comments/Assumptions & Req.ID C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [F147]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [F147]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Thermostatic controls have a 5 IF ❑Complies Requirement will be met. 2 deadband• ❑Does Not [F138]3 ❑Not Observable ❑Not Applicable C403.2.4. Temperature controls have setpoint ❑Complies Requirement will be met. 2 overlap restrictions. ❑Does Not [FI20]3 ❑Not Observable ❑Not Applicable C403.2.4. Each zone equipped with setback ❑Complies Requirement will be met. 3 controls using automatic time clock or ❑Does Not [F139]3 programmable control system. ❑Not Observable ❑Not Applicable C403.2.4. Automatic Controls: Setback to 55°F ❑Complies Requirement will be met. 3 (heat) and 85°F (cool); 7-day clock, 2- ❑Does Not [F140]3 hour occupant override, 10-hour ❑Not Observable backup ❑Not Applicable 11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 10 of 13 j Section # Final Inspection Complies? Comments/Assumptions � & Req.iD C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not i[F141]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [F141]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not (FI41]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [F141]3 ❑Not Observable i ❑Not Applicable �C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C408.2.5. Furnished HVAC as -built drawings ❑Complies Requirement will be met. 1 submitted within 90 days of system ❑Does Not [FI7]3 acceptance. ❑Not Observable ❑Not Applicable C303.3, Furnished O&M manuals for HVAC ❑Complies Requirement will be met. C408.2.5. systems within 90 days of system ❑Does Not 3 [F18]3 acceptance. ❑Not Observable ❑Not Applicable C408.2.5. An air and/or hydronic system ❑Complies Requirement will be met. 3 balancing report is provided for HVAC ❑Does Not [F14311 systems. ❑Not Observable ❑Not Applicable C408.2.3. HVAC control systems have been ❑Complies Requirement will be met. 2 tested to ensure proper operation, ❑Does Not [FI10]1 calibration and adjustment of controls. ❑Not Observable ❑Not Applicable 0404.3 Public lavatory faucet water ❑Complies Requirement will be met. [FI11]3 temperature <=110°F. []Does Not ❑Not Observable ❑Not Applicable C404.5 All piping in circulating system ❑Complies Requirement will be met. [F[25]2 insulated ❑Does Not ❑Not Observable ❑Not Applicable 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 11 of 13 Section # Final Inspection Complies? Comments/Assumptions & Req.ID lC404.6 'Controls are installed that limit the ❑Complies Requirement will be met. [FI12]3 operation of a recirculation pump ❑Does Not installed to maintain temperature of a ❑Not Observable storage tank. ❑Not Applicable C403.2.2 HVAC systems and equipment ❑Complies Requirement will be met. [FI27]3 capacity does not exceed calculated ❑Does Not loads. []Not Observable ❑Not Applicable C408.2.1 Commissioning plan developed by ❑Complies Requirement will be met. [FI28]1 registered design professional or ❑Does Not approved agency. ❑Not Observable ❑Not Applicable C408.2.4 Preliminary commissioning report ❑Complies Requirement will be met. [FI29]1 completed and certified by registered ❑Does Not design professional or approved ❑Not Observable agency. ❑Not Applicable C408.2.5. Final commissioning report due to ❑Complies Requirement will be met. 4 building owner within 90 days of ❑Does Not [F130]1 receipt of certificate of occupancy. ❑Not Observable ❑Not Applicable C408.2.3. HVAC equipment has been tested to ❑Complies Requirement will be met. 1 ensure proper operation. ❑Does Not [17I31]1 ❑Not Observable ❑Not Applicable C408.2.3. Economizers have been tested to ❑Complies Requirement will be met. 3 ensure proper operation. ❑Does Not [F132]1 ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 1 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 12 of 13 Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 13 of 13 DS ■a�, Environmental CONSULTING - "The trusted choice for your environmental & industrial hygiene needs." ASBESTOS PCM CLEARANCE REPORT PRESENTED TO: Mr. Matt Peterson Colorado Hazard Control 1775 W. 55th Ave. Denver, CO 80221 303-412-8575 mPeterson@coloradohazard.com Front Range 7555 W 10th Ave Suite A, Lakewood, CO 80214 Midtown Montessori Academy 3480 Ames St, Wheat Ridge, Colorado INSPECTED BY: Pierce Gladfelter DS Environmental Cell: (303) 881-5330 Mountains PO Box 6864 Avon, CO 81620 PROJECT DETAILS: DS Job Number: 20673 CHC Job Number: 291-A19P Date of Inspection: January 9, 2019 �4 k1opeBox 793 teen. �O 1612 Web dsconsultinginc.com Direct (303) 286-9094 Fax (303) 986-0121 Table of Contents 1.0 Introduction 2.0 Project Details 3.0 Certifications 4.0 Final Visual & Final Clearance Procedures 5.0 Air Sample Analyzation 6.0 Air Sample Results 7.0 Copyright Notice APPENDIX A CERTIFICATIONS 2 1.0 Introduction Mr. Pierce Gladfelter with DS Environmental (DS) conducted a final visual inspection, performed aggressive clearance air monitoring, and analyzed clearance air quality samples via Phase Contrast Microscopy (PCM) for a fully permitted asbestos abatement project being conducted to remove asbestos -containing materials (ACM) from the residence detailed on the cover page of this report. The asbestos abatement was being conducted to remove —180 sf of asbestos -containing floor tile and associated mastic from main level and lower level storage rooms north of the main level basketball court. The abatement project passed the final visual inspection and the analytical results of all final clearance samples collected were below the CDPHE's clearance criteria of 0.01 fibers/cubic centimeter (f/cc). The containment area can be deconstructed, and the abatement area can be re -occupied. 2.0 Project Details 3 GAC & Permit General Abatement Contractor (GAC) Colorado Hazard Control (CHC) GAC Supervisor Ed Holmes CDPHE Permit Number 191E725IN Containment Details Number of Containments 1 Containment Type(s) Secondary Containment Containment Area(s) Main Level and Lower Level Storage Rooms North of Main level Basketball Court Analyzation Details Sample Analyzation Method Phase Contrast Microscopy (PCM) Analyzation Method NIOSH 7400 Number of Samples Collected 5 Number of Blank Samples Collected 2 Asbestos -Containing Materials Abated Type of ACM Quantity Removed Location Removed From Floor Tile &Associated Mastic 180 sf Main Level and Lower Level Storage Rooms North of Main level Basketball Court 3 3.0 Certifications The final visual inspection, the aggressive clearance air monitoring, and the PCM air sample analyzation were conducted by Mr. Pierce Gladfelter with DS. Mr. Gladfelter is a CDPHE certified Air Monitoring Specialist (AMS); having certification number 25401 and a NIOSH 582 certified analyst. DS is a CDPHE certified Asbestos Consulting Firm, Registration No. 14912 and a participant in the Industrial Hygiene Proficiency Analytical Testing (IHPAT) program with laboratory ID No. 188987 maintaining a rating of Proficient. 4.0 Final Visual & Final Clearance Procedures Prior to the collection of final clearance air samples, a final visual inspection was conducted to ensure all the requirements of CDPHE's Regulation 8, Part B — Asbestos were met. Once the abatement area passed the final visual inspection, DS collected final clearance air samples from five (5) locations within the containment. Following the collection of the final clearance air samples, the samples were analyzed, along with sample blanks, to determine the airborne fiber concentrations. The air samples were collected at an average flow rate of less than 16.0 liters per minute (L/m) using Thomas high-volume pumps with a minimum volume of air to meet the analytical sensitivity for the NIOSH 7400 analyzation method used to analyze the samples. Flow rates were collected at the beginning and at the end of the sampling period utilizing an airflow rotameter calibrated against a primary -flow calibration instrument. Start times and stop times were recorded for all sampling periods. 5.0 Air Sample Analyzation The final clearance PCM samples were collected on 25 -millimeter (mm) mixed -cellulose, ester -membrane filters with a 0.8 -micron pore size and an effective collection area of 385 mm. All filters were pre -assembled by the manufacturer in three -stage, conductive sampling cassettes with extension cowls. A field blank and lab blank were also collected and analyzed along with the clearance samples. The final clearance PCM samples were analyzed according to the NIOSH 7400 Method. This method counts and identifies "fibers" that meet the counting criteria for the method, which is not specific to asbestos fibers; therefore, all fibers that meet the counting criteria are counted as asbestos fibers. If the total fiber count is less than 0.01 fibers/cubic centimeter (f/cc), it is known that the total asbestos fiber count is also less than 0.01 fibers/cubic centimeter (f/cc). 4 6.0 Air Sample Results Clearance Sample Avg Flow Time Volume Fibers/ Reporting Results PASS/ Sample ID Location Rate (liters) (min) (liters) 100 Fields Limit (f/cc) (f/cc)* FAIL 1080-1798 Main Level Storage Room 1799-5400 .001 CL1 North of Main Level Basket Ball 14.6 90 1,314 5.0 0.005 BRL PASS Court, E Side Main Level Storage Room CL2 North of Main Level Basket Ball 14.8 90 1,332 3.5 0.005 BRL PASS Court, W Side Lower Level Storage Room CL3 North of Main Level Basket Ball 14.85 90 1,336.5 7.5 0.005 BRL PASS Court, W Side Lower Level Storage Room CL4 North of Main Level Basket Ball 15.0 91 1,365 7.0 0.005 BRL PASS Court, Center Lower Level Storage Room CL5 North of Main Level Basket Ball 14.9 91 1,355.9 6.0 0.005 BRL PASS Court, E Side `Sample analysis has been blank corrected Blank Sample Fibers/ Sample ID Description 100 Fields LB Lab Blank 0 FB Field Blank 0 7.0 Copyright Notice Legend Reporting.. Limit (RL) Volume (liters) Reporting Limit BRL = Below Reporting Limit 490 .006 CBR = Cannot Be Read 491-599 .005 Min = Minutes 600-770 .004 RL = Reporting Limit 771-1079 .003 f/cc = fibers per cm3 1080-1798 .002 1799-5400 .001 © DS Environmental 2020. All Rights Reserved. This document contains material protected under Federal Copyright Laws. No part of this document or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author and DS Environmental. 5 APPENDIX A: CERTIFICATIONS s - e kvn( =fir t n e t cntairaan ngarrrrun� ' �'� � � �` of Public Eicaldt andF,mimnntent. t ASBESTOS s CERTIFICATION* _. jv This cerdfies that 5e, a 1 C Pierce Giadfelter a Certification >o -:254O1 has met the mquircmcros of ?S-7 407. C.R.S. and Air Quality Contmi �- Cormnission Regulation No, 8. Part 8, and is hereby catitled by the state, of Colorado in the following discipline: N �"� • Air Monitoring Specialist* .` .. hsned: May 02, 2015 4 r:ptra. May 02, zoo ° EL 6 0 o w e c...Nd.tmo.,m•w±+awrmrsa.�.e<o-+fr. i. R..:.._ y - - r- AMS Certification: 25401 Firm Certification: 14912 111 01 1 N Z �� a �S tw £y� 4 x' r is se 0 FFV1 11 z 'gis t m¢ e 6 Z a an i'rt y 't V y+ NIOSH 582E Lab Certification: 14912 7 6�( COMcheck Software Version 4.1.1.0 Interior Lighting Complianc Project Information Energy Code: Project Title: Project Type: Construction Site: Wheat Ridge, IL #Zo2otoo 13 6 2012 IECC Montessori School Alteration Owner/Agent: D Mtj:gE�Wr--- Allowed Interior Lighting Power A Area Category i irate v `O K. 7440 1.30 PE.0043682 Total Allowed Watts = 9672 Proposed Interior Lighting Power Designer/Contractor:' RTM Engineering Consultants 650 E. Algonquin Road Suite 250 Schamburg, IL 60173 847.756.4180 B C D Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B X C) 1 -Common Space Types:Classroom / Lecture /Training 7440 1.30 9672 Total Allowed Watts = 9672 Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Common Space Types:Classroom/Lecture/Training (7440 sq.ft.) LED: F1: 2x4 Fixture: Other: 1 90 45 4050 LED: F1 A: 2x2 Fixture: Other: 1 14 30 420 LED: F2: Recessed Downlight Fixture: Other: 1 1 40 40 LED: F3: Wall Vanity Fixture: Other: 1 1 20 20 Total Proposed Watts = 4530 Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the In Ch < t. _UAMto iI Laig • T�Ct Name - Title Signature Date Project Title: Montessori School Report date: 12/20/19 Data filename: H:\_2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 1 of 6 COMcheck Software Version 4.1.1.0 Inspection Checklist Energy Code: 2012 IECC Requirements: 75.0% were addressed directly in t -fie COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. # & Req IDI Plan Review Complies? Comments/Assumptions C103.2 Plans, specifications, and/or []Complies [PR4]1 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable determined for the interior lighting and electrical systems and equipment❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Montessori School Report date: 12/20/19 Data filename: H:\-2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck. cck Page 2 of 6 Section # Rough -In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.2. Automatic controls to shut off all ❑Complies :Requirement will be met. 1 building lighting installed in all a❑Does Not [EL22]2 ;buildings. ;❑Not Location on plans/spec: E200,E201 Observable ❑Not Applicable C405.2.1. 'Independent lighting controls installed ;❑Complies ;Requirement will be met. 1 per approved lighting plans and all '❑Does Not [EL23]2 manual controls readily accessible and ❑Not Observable ; Location on plans/spec: E200,E201 visible to occupants. ❑Not Applicable C405.2.1. Lighting controls installed to uniformly ;❑Complies Exception: Areas that are controlled by an occupancy sensor. 2 � reduce the lighting load by at least q❑Does Not [EL15]1 :50%. ;❑Not Observable :Location Lon plans/spec: E200,E201 ❑Not Applicable C405.2.2.i Daylight zones provided with ;❑Complies ; Requirement will be met. 3 :individual controls that control the :❑Does Not [EL1612 I lights independent of general area ❑Not Observable: Location on plans/spec: E200,E201 lighting. ❑Not Applicable C405.2.3 ',Sleeping units have at least one ;❑Complies ; Exception: Requirement does not apply. [EL17]3 � master switch at the main entry door ❑Does Not ;that controls wired luminaires and ❑Not Observable ;switched receptacles. ❑Not Applicable ; C405.2.2. Occupancy sensors installed in ;❑Complies ; Requirement will be met. 2 required spaces. ;[:]Does Not [EL18]1 :Location on plans/spec: E200,E201 ❑Not Observable: ❑Not Applicable C405.2.2. ;Primary sidelighted areas are ;❑Complies ;Exception: Requirement does not apply. 3 equipped with required lighting UDoes Not [EL20]1 ;controls. i ❑Not Observable ❑Not Applicable C405.2.2. Enclosed spaces with daylight area ;❑Complies ; Exception: Requirement does not apply. 3 :under skylights and rooftop monitors E❑Does Not [EL21]1 ;are equipped with required lighting Observable controls. ,❑Not ❑Not Applicable C405.2.3 Separate lighting control devices for ;❑Complies Requirement will be met. [EL4]1 ;specific uses installed per approved ;❑Does Not ;lighting plans. Location on plans/spec: E200,E201 ;❑Not Observable ; ❑Not Applicable C405.3 Fluorescent luminaires with odd ;❑Complies ? Exception: Requirement does not apply. [EL19]3 numbered lamp configurations that �❑Does Not !are within 10 feet center to center (if :Location on plans/spec: E200,E201 ❑Not Observable ledge recess mounted) or are within 1 foot to edge (if pendant or surface ;❑Not Applicable ; ;mounted) shall be tandem wired. C405.4 ;Exit signs do not exceed 5 watts per ;❑Complies ;Requirement will be met. [EL6]1 :.face.❑Does Not Location on plans/spec: E000 ❑Not Observable ; ❑Not Applicable C405.2.3 ;Additional interior lighting power❑Complies ;Requirement will be met. [EL8]1 :allowed for special functions per the j❑Does Not ;approved lighting plans and is Location on plans/spec: E200,E201 ❑Not Observable automatically controlled and .separated from general lighting. ;❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Montessori School Report date: 12/20/19 Data filename: H:\_2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 3 of 6 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Montessori School Report date: 12/20/19 Data filename: H:\ 2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 4 of 6 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C408.2.5. :Furnished as -built drawings for ;❑Complies 1 :electric power systems within 30 days :❑Does Not [F116]3 :of system acceptance. '❑Not Observable ❑Not Applicable C303.3, Furnished O&M instructions for ;❑Complies C408.2.5. systems and equipment to the :❑Does Not 2 :building [FI17]3 owner or designated representative. ❑Not Observable ❑Not Applicable C405.5.2 ; Interior installed lamp and fixture ;❑Complies ;see the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what ;❑Does Not is shown on the approved lighting Observable :plans, i demonstrating proposed watts❑Not are less than or equal to allowed ;❑Not Applicable watts. C408.3 ; Lighting systems have been tested to ;❑Complies [FI33]1 :ensure proper calibration, adjustment, '❑Does Not programming, and operation. ;❑Not Observable' ❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Montessori School Report date: 12/20/19 Data filename: H:\_2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 5 of 6 Project Title: Montessori School Report date: 12/20/19 Data filename: H:\-2019\19.RTO.003 - Montessori School Wheat Ridge\07 CALCS\04 ENERGY\COMcheck.cck Page 6 of 6 6 COMcheck Software Version 4.1.1.0 �( Mechanical Compliance Certificate Project Information *2WO W I3 C> Energy Code: 2012 IECC Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Location: Wheat Ridge, Colorado Climate Zone: 5b Project Type: Alteration p r= v/ Construction Site: Owner/Agent: Designer/Contractor: 3480 AMES STREET THE RTO GROUP RTM ENGINEERING CONSULTANTS WHEAT RIDGE, CO DENVER, CO WHEAT RIDGE, CO Mechanical Systems List Quantity System Type & Description 1 F1-CU1 (Single Zone): Heating: 1 each - Central Furnace fl), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU1), Capacity = 36 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency= 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 1 I F1 -- Compliance (Motor nameplate HP method) : Passes Fans: BF1 Supply, Constant Volume, 1000 CFM, 0.5 motor nameplate hp 1 F2-CU2 (Single Zone): Heating: 1 each - Central Furnace (F2), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU2), Capacity = 36 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 2 1 F2 -- Compliance (Motor nameplate HP method) : Passes Fans: BF2 Supply, Constant Volume, 1025 CFM, 0.5 motor nameplate hp 1 F3-CU3 (Single Zone): Heating: 1 each - Central Furnace (F3), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU3), Capacity = 36 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency= 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 3 1 F3 -- Compliance (Motor nameplate HP method) : Passes Fans: BF3 Supply, Constant Volume, 1000 CFM, 0.5 motor nameplate hp 1 F4-CU4 (Single Zone): Heating: 1 each - Central Furnace (174), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU4), Capacity = 36 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency= 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 4 1 F4 -- Compliance (Motor nameplate HP method) : Passes Fans: BF4 Supply, Constant Volume, 1000 CFM, 0.5 motor nameplate hp 1 F5-CU5 (Single Zone): Heating: 1 each - Central Furnace (F5), Gas, Capacity = 66 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 1 of 13 Quantity System Type & Description Cooling: 1 each - Split System (CU5), Capacity = 36 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency= 15.50 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 51 F5 -- Compliance (Motor nameplate HP method) : Passes Fans: BF5 Supply, Constant Volume, 1025 CFM, 0.5 motor nameplate hp 1 F6-CU6 (Single Zone): Heating: 1 each - Central Furnace (F6), Gas, Capacity = 88 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU6), Capacity = 48 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 6 1 F6 -- Compliance (Motor nameplate HP method) : Passes Fans: BF6 Supply, Constant Volume, 1335 CFM, 0.8 motor nameplate hp 1 F7-CU7 (Single Zone): Heating: 1 each - Central Furnace (F7), Gas, Capacity = 110 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et (or 78% AFUE) Cooling: 1 each - Split System (CU7), Capacity = 60 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: BLOWER FAN 71 F7 -- Compliance (Motor nameplate HP method) : Passes Fans: BF7 Supply, Constant Volume, 1685 CFM, 1.0 motor nameplate hp 1 WH1: Gas Storage Water Heater, Capacity: 100 gallons, Input Rating: 199 kBtu/h w/ Circulation Pump Proposed Efficiency: 80.00 % Et, Required Efficiency: 80.00 % Et Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. I cLe, F Z v?O 14 Name Title SicJna16C Date 28309 ,'NAIE� Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 2 of 13 eoess �v ol COMcheck Software Version 4.1.1.0 Inspection Checklist Energy Code: 2012 IECC Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMIcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # & Req.ID Plan Review Complies? Comments/Assumptions C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR2)1 calculations provide all information ❑Does Not standard are claimed. Hot water with which compliance can be ❑Not Observable determined for the mechanical ❑Not Applicable systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR3)1 calculations provide all information []Does Not with which compliance can be ❑Not Observable determined for the service water heating systems and equipment and ❑Not Applicable document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizina auide. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 3 of 13 & Re # Footing / Foundation Inspection Complies? Comments/Assumptions a.ID C403.2.4. Freeze protection and snow/ice ❑Complies Requirement will be met. 5 melting system sensors for future ❑Does Not [FO9]3 connection to controls. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 1 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 4 of 13 # & Req.ID Plumbing Rough -In Inspection I Complies? Comments/Assumptions C404.3 Temperature controls installed on ❑Complies Requirement will be met. [PL511 service water heating systems (110 F ❑Does Not for dwelling units and lavatories in ❑Not Observable public restrooms and 90 F for other ❑Not Applicable occupancies.) C404.4 Automatic time switches installed to ❑Complies Requirement will be met. [PL3)1 automatically switch off the ❑Does Not recirculating hot-water system or heat ❑Not Observable trace. ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 5 of 13 Section # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Req.ID C403.2.3 HVAC equipment efficiency verified. ❑Complies See the Mechanical Systems list for values. [ME55]2 ❑Does Not ❑Not Observable ❑Not Applicable C403.2.5. Demand control ventilation provided ❑Complies Exception: Systems with design outdoor air of less than 1200 1 for spaces >500 sq.ft. and >25 ❑Does Not cfm. [ME59]1 people/1000 sq.ft. occupant density ❑Not Observable and served by systems with air side ❑Not Applicable economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. C403.2.7 HVAC ducts and plenums insulated. ❑Complies Requirement will be met. [ME60]2 Where ducts or plenums are installed ❑Does Not in or under a slab, verification may need to occur during Foundation ❑Not Observable Inspection. ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur during Foundation Inspection. ❑Not Observable ❑Not Applicable C403.2.8 HVAC piping insulation thickness. []Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur during Foundation Inspection. ❑Not Observable ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur during Foundation Inspection. []Not Observable ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur during Foundation Inspection. ❑Not Observable ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur during Foundation Inspection. ❑Not Observable ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur during Foundation Inspection. ❑Not Observable ❑Not Applicable C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a []Does Not slab, verification may need to occur during Foundation Inspection. ❑Not Observable ❑Not Applicable C403.2.8. Piping Insulation exposed to weather ❑Complies Requirement will be met. 1 is protected from damage (due to sun, ❑Does Not [ME7]3 moisture, wind, etc.). ❑Not Observable ❑Not Applicable C403.2.8 Thermally ineffective panel surfaces of❑Complies Exception: Requirement does not apply. [ME41]3 sensible heating panels have ❑Does Not insulation >= R-3.5. ❑Not Observable ❑Not Applicable 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 6 of 13 Section # Mechanical Rough -in Inspection Complies? Comments/Assumptions & Req.ID C403.2.7 Ducts and plenums sealed based on ❑Complies Requirement will be met. [ME10]2 static pressure and location. ❑Does Not []Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. []Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [MEll]3 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. []Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 design capacity, control signal, [ME62]1 ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 design capacity, control signal, [ME62]1 ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and []Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 design capacity, control signal, [ME62]1 ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. 111 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 7 of 13 Section # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Req.ID C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 j [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable j integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1 [ME62]1 design capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C408.2.2. Air outlets and zone terminal devices ❑Complies Requirement will be met. 1 have means for air balancing. ❑Does Not [ME53]3 ❑Not Observable ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. []Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- []Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or have controls to limit fan motor ❑Not Observable demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or []Not Observable have controls to limit fan motor demand. ❑Not Applicable 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 8 of 13 section # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Req.ID C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME6612 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor demand. ❑Not Applicable C403.2.6 Exhaust air energy recovery on ❑Complies Exception: Requirement does not apply. [ME57]1 systems meeting Table C403.2.6 ❑Does Not ❑Not Observable ❑Not Applicable C403.2.11 Unenclosed spaces that are heated ❑Complies Exception: Requirement does not apply. [ME71]2 use only radiant heat. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact(Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.( Page 9 of 13 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [F[47]3 Minimum one humidity control device ❑Not Observable ' per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [F147]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [F[47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. nDoes Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Thermostatic controls have a 5 °F ❑Complies Requirement will be met. 2 deadband. ❑Does Not [FI38]3 ❑Not Observable ❑Not Applicable C403.2.4. Temperature controls have setpoint ❑Complies Requirement will be met. 2 overlap restrictions. ❑Does Not [F120]3 ❑Not Observable ❑Not Applicable C403.2.4. Each zone equipped with setback ❑Complies Requirement will be met. 3 controls using automatic time clock or ❑Does Not [F139]3 programmable control system. []Not Observable ❑Not Applicable C403.2.4. Automatic Controls: Setback to 55°F ❑Complies Requirement will be met. 3 (heat) and 85°F (cool); 7 -day clock, 2- ❑Does Not [F140]3 hour occupant override, 10 -hour ❑Not Observable backup ❑Not Applicable 1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: HARTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 10 of 13 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [F141]3 ❑Not Observable ❑Not Applicable C403.2.4. 'Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [F141]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception: Requirement does not apply. 3.3 controls. ❑Does Not [FI41]3 ❑Not Observable ❑Not Applicable C408.2.5. Furnished HVAC as -built drawings ❑Complies Requirement will be met. 1 submitted within 90 days of system ❑Does Not [FI7]3 acceptance. ❑Not Observable ❑Not Applicable C303.3, Furnished O&M manuals for HVAC ❑Complies Requirement will be met. C408.2.5. systems within 90 days of system ❑Does Not 3 [FIS]3 acceptance. ❑Not Observable ❑Not Applicable C408.2.5. An air and/or hydronic system ❑Complies Requirement will be met. 3 balancing report is provided for HVAC ❑Does Not [F143]1 systems. ❑Not Observable ❑Not Applicable C408.2.3. HVAC control systems have been ❑Complies Requirement will be met. 2 tested to ensure proper operation, ❑Does Not [FI10]1 calibration and adjustment of controls. ❑Not Observable ❑Not Applicable C404.3 Public lavatory faucet water ❑Complies Requirement will be met. [FI11]3 temperature <=110°F, ❑Does Not ❑Not Observable ❑Not Applicable C404.5 All piping in circulating system ❑Complies Requirement will be met. [FI25]2 insulated ❑Does Not ❑Not Observable ❑Not Applicable 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 11 of 13 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C404.6 Controls are installed that limit the ❑Complies Requirement will be met. [FI12]3 operation of a recirculation pump ❑Does Not installed to maintain temperature of a ❑Not Observable storage tank. ❑Not Applicable C4003.2.2 HVAC systems and equipment ❑Complies Requirement will be met. [FI27]3 capacity does not exceed calculated ❑Does Not loads. ❑Not Observable _ ❑Not Applicable C408.2.1 Commissioning plan developed by ❑Complies Requirement will be met. [F128]1 registered design professional or ❑Does Not approved agency. ❑Not Observable ❑Not Applicable C408.2.4 Preliminary commissioning report ❑Complies Requirement will be met. [F129]1 completed and certified by registered ❑Does Not design professional or approved ❑Not Observable agency. ❑Not Applicable C408.2.5. Final commissioning report due to ❑Complies Requirement will be met. 4 building owner within 90 days of ❑Does Not [F130]1 receipt of certificate of occupancy. ❑Not Observable ❑Not Applicable C408.2.3. HVAC equipment has been tested to ❑Complies Requirement will be met. 1 ensure proper operation. ❑Does Not [FI31]1 ❑Not Observable ❑Not Applicable C408.2.3. Economizers have been tested to ❑Complies Requirement will be met. 3 ensure proper operation. ❑Does Not [F132]1 ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: H:\RTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 12 of 13 Project Title: FACILITY REMODEL FOR MIDTOWN MONTESSOIR ACADEMY Report date: 12/30/19 Data filename: HARTM_DEN\MSWR - Montessori School Wheat Ridge\E - Engineering Design Files\COMCHECK.c Page 13 of 13 City of Wh6atl idge COMMUNITY DEVELOPMENT SUBCONTRACTOR AUTHORIZATION FORM Mechanical Subcontractor This form must be completed & signed by the MECHANICAL SUBCONTRACTOR performing mechanical work on site. Subcontractor's insurance and license must be up to date prior to permit issuance. Project Address: 3480 Ames Street, Wheat Ridge, CO General Contractor: Turn Key General Contractors, Inc. 12141 '140 IVAI 10 MIZ�.I1 _96_ '1 \ Company Name:Denver Heating & Air-conditioningContact Phone #: 303-806-8000 Wheat Ridge Contractor License #: 017942 (required field) Devin Olivas Printed Name of Authorized Agent �--�^- (9 t--, 03/17/2020 Signature of Authorized Agent Date t itf 'locile Conn�ur�i r l3vFLoPFtT SUBCONTRACTOR AUTHORIZATION FORM Plumbing Subcontractor This fionn must he completed & signed by the PLUMBING SUBCONTRACTOR pzrtorming plumbing work on site. Subcontractor's insurance and license must be up to date prior to pennit issuance. Project .address: ��� / J /eo 7 General Contractor: Company Name: s T/f (//f P�& -Set/Contact Phone #: Wheat Ridge Contractor License :210 2�0__(i-equired field) %#ate License #: Master License #: 47 9 Z S T.� k1A /.:;) ej y,,� e Printed Name of Authorized Agent S -/ 7 ` z o Signature of:Atit horiie agent Date City of h6 at W ige COMMUNITY DEVELOPMENT SUBCONTRACTOR AUTHORIZATION FORM Electrical Subcontractor This ror►n must be completed & sinned by the ELECTRICAL SUBCONTRACTOR performing electrical work on site. Subcontractors insurance and license must be up to date prior to permit issuance. Project Address: J ! Od _Aw General Contractor: FQKN1'*N it t NQJ Kt ACCEPILD 111111 MISSING INFOWMATION Company Nante: TN'! • SOS VeZ N1L Contact Phone#: 70- )10 "d+10ot Wheat Ridge Contractor License #: SQd 7 (required field) State Liccnsc #: 6166(101, Master License #: y y S_ ? �a� I �t�,s�ern�raek Printed ame of Authorized Agent signature of Authorized Agent Y -i 7 -da Date PERMIT N0: JOB ADDRESS: JOB DESCRIPTION: City of Wheat Ridge Commercial Demolition PERMIT - 202000187 202000187 3480 Ames St Commercial demolition of Square footage: 5000 ISSUED: 01/27/2020 EXPIRES: 01/26/2021 walls and concrete. Asbestos has been removed. *** CONTACTS *** OWNER (214)517-5059 3480 AMES STREET, LLC SUB (303)467-9667 GLENN MASSAROTTI 018462 TURN KEY GENERAL CONTRACTORS, *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UP_ / Unassigned SUBDIVISION CODE: 501 / BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 0.00 FEES Total Valuation 0.00 Demolition Fee 50.00 ** TOTAL ** 50.00 *** COMMENTS *** *** CONDITIONS *** All work shall comply 2012 International Codes, 2017 NEC (if applicable), and ordinances adopted by the City of Wheat Ridge. Work is subject to field inspections. 1, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved pians and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed and that zl o},k to e performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanyingplans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpennit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval. 5. The permit ho der shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or grant i of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any appli,cabje code or an7 i-dinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City of W heat P., idgt- COMMUNITY DEVELOPMENT Building & Inspection Services 7500 W. 291 Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: Perm its(@ci.wheatridge.co.us I FOR OFFICE USE ONLY Date: Plan/Per it # Plan Review Fee;,,z� Building Permit Application *** Complete all applicable highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: 3g8u 6_�Ky-o k Property Owner (please print): 57Tt2c9_-E ) 6'L' C_ Phone: alb. t •$'QS`c, Property Owner Email:-��, --�� r,.l/r�1 r���n-►f}cR;��^y� mac; i Tenant Name (Commercial Projects Only) ["In Mc�Z c2t--I �96L.4^-Z-- Property Owner Mailing Address: (if different than property address) Address: /G 1�S G/,V� , U✓v f i a U� City, State, Zip: i/ - C C.) Architect/Engineer: (•�1 Gd-/�>-� c�t� �% 775't jZ=Z3c..%J Architect/Engineer E-mail: (QC14Ct_� R=SPGR-��-Y�� c)�h one: 73Q q ej Contractor Name: Ict;St^,e3TLACIZoI City of Wheat Ridge License #: (1SlPhone: 3"._3 aG 3- �� G Contractor E-mail Address: C—J-0r J "1 G_ t=c=1C_C" CC)'I For Plan Review Questions & Comments (please print): CONTACT NAME (please print): f-IA55Af'U7_�r-) Phone: �3- 44C '-7- 9 G C .�;L CONTACT EMAIL(p/ease print): Cc -L/7 Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form): Electrical: Plumbing: Mechanical: W.R. City License # W.R. City License # W.R. City License # Other City Licensed Sub: Other City Licensed Sub: City License # City License # Complete all highlighted fields, if applicable. COMMERCIAL ❑ RESIDENTIAL Provide description of work: For ALL projects, provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc. C F C 6AJ C42-�or j Z� Sq. FULF 5 CX-Zr/ BTUs Gallons Amps Squares For Solar: KW # of Panels Requires structural For Commercial Projects Only: Occupancy Type: 6 Construction Type: 1/) -13 Occupancy Load: / - `, Square Footage: 13, y " / Project Value: (Contract value or the cost of all materials and labor included in the entire project) OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLE ONE: (OWNER)(CONTRACTOR) r HORIZEp REPRESENTATIVE) of (OWNER) (CONTRACTOR) i Signature (first and last name): J DATE: Printed Name: �uN� !�1/N+SSf1�� ZONING COMMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer: PUBLIC WORKS COMMENTS: Reviewer: DEPARTMENT USE ONLY OCCUPANCY CLASSIFICATION: CONSTRUCTION TYPE: Building Division Valuation: 001 'd tct L -L9 :o�.f laa!OJd rK11MtlL4W0 OZ/r1A0 _ _—. __ t.. allA� al¢Q • 3 W, O T �Orp ap>- A rn�NN 3 • sIa al t q a � V pzZ `dooi0 OL S a9.L nw�arvwa,i t.>,!v>'v �nie mxuw �� t�!m k�v.. sMJo an m'vmu�mp uuw�!� at!VW +VtN>Imm p�ys��ynMn �ew3uo �w s� w,wtwp e�N �o uvip.w m u.ee,pe�newmw� nv GENERAL DEMOLITION N07E5 Re"pve Au fwaR fl `N HA ^ewALs FRav E � RooNs <�xAces A.w l LOTN"e ie :Lool/i`U. foie INs :ev.*'ion loe n��v ry s. LOWER 5TOR DEMO mTR n ., „e•. , - �• - "^:oEa�a�s�ro�� �D��.»*RE�OV�E„<; �I,E HATE—L IN ALG00.rpANGE Mry HAn�£AGTVR— n0.RTEN IrE).s coNr •may/�/�'/�����. „��� b4•S•1=6'O.G UNp5N.--Tw GOHfAGTEp NOnExf"n51vE F1L fD) •4 DONT y__L NEW STAIR SECTION Y BASEMENT DEMO I I - L - - - -------- -- MEZZANINE DEMO 5 NEW STAIR PLAN SCALE: 1 /2' • 1' - O' All inrmnu —Snwn Q• .... ..r m— i, the Dn&A.. nnnsl—kor �Aehi— api.n oD.ai.clowR. •T DN: brw: Mo.k .iBnDt rk a,..xNt br uRAr<nikxt is v�nimNa. The R T O Group, Ltd. • Architects Date 1— DEHpRS.TE LA5iaw ww TA D- TIeWLL pIVWL,LOi.dFT. ,oT. [R4. T[LCfHON[ /DATA DEVKES nNETNEF SHOrd ON RAN OF TMELL plMO SLABS ON E%BTINb fARTliiOnS TO REMAm- fE1, � 9AnD l0 LEVEL . fM5H / LE6ENO w':' CLILMILK/TILHNON!/DATA DIviLG TO EI RGHOVED . 91—NDT1ERMOSTATTOBERELOLATED ®8 CxBTINblLCLTROALrtll2fHONGpATA DlvLl TO FEMAm }D' 62-2131 te)saApE A101 � � � n)•s LowT s torr • to w°,r wnER LEVEL fL00 IrE).s coNr •may/�/�'/�����. „��� b4•S•1=6'O.G UNp5N.--Tw GOHfAGTEp NOnExf"n51vE F1L fD) •4 DONT y__L NEW STAIR SECTION Y BASEMENT DEMO I I - L - - - -------- -- MEZZANINE DEMO 5 NEW STAIR PLAN SCALE: 1 /2' • 1' - O' All inrmnu —Snwn Q• .... ..r m— i, the Dn&A.. nnnsl—kor �Aehi— api.n oD.ai.clowR. •T DN: brw: Mo.k .iBnDt rk a,..xNt br uRAr<nikxt is v�nimNa. The R T O Group, Ltd. • Architects Date 1— DEHpRS.TE LA5iaw ww TA D- TIeWLL pIVWL,LOi.dFT. ,oT. [R4. T[LCfHON[ /DATA DEVKES nNETNEF SHOrd ON RAN OF TMELL plMO SLABS ON E%BTINb fARTliiOnS TO REMAm- fE1, � 9AnD l0 LEVEL . fM5H GONSTRLGTYJN - LE6ENO w':' CLILMILK/TILHNON!/DATA DIviLG TO EI RGHOVED . 91—NDT1ERMOSTATTOBERELOLATED ®8 CxBTINblLCLTROALrtll2fHONGpATA DlvLl TO FEMAm lT) ExB11N6 THERMOSTAT TO REMAm L TRGHOVlD —TAL STW•brf BOAFDfARTI}GTI TO CE 62-2131 C=[x—nOO—A-T— brf SOAFp fMtTNWN TO REHUN O KEYED DEMOLITION PLAN NOTES A -m OfEwnb FOR nlnS-OxT'-O'°OOR/lRAMC wsSEHBLE B0.TE NEn DBL � x e' x 4/D' STEEL AN•LE LmTEL- THROYDN- olxTErziOa nAL_n/S,H'B0.T4.O-D'O.G A101 B ATOYMGw•inH6rvnAEDRE[DOYRnwA�OO'RT[POAµv5-5wEH�l1TU—RH HVb[ SRFOSEHRL-Al-Why ERl��ExxNgB�TTmNb F5prvEO"O+ER5s.iu0f5Rn a LTSmn b TWLOR LwrL�o-�9SETA� FOR Nfn nNEELL+Mt LfT IrE).s coNr •may/�/�'/�����. „��� b4•S•1=6'O.G UNp5N.--Tw GOHfAGTEp NOnExf"n51vE F1L fD) •4 DONT y__L NEW STAIR SECTION Y BASEMENT DEMO I I - L - - - -------- -- MEZZANINE DEMO 5 NEW STAIR PLAN SCALE: 1 /2' • 1' - O' All inrmnu —Snwn Q• .... ..r m— i, the Dn&A.. nnnsl—kor �Aehi— api.n oD.ai.clowR. •T DN: brw: Mo.k .iBnDt rk a,..xNt br uRAr<nikxt is v�nimNa. The R T O Group, Ltd. • Architects Date 1— Dv,•/DD GONSTRLGTYJN - Project No: 62-2131 Drawing A101 PROJECT DATA OV14/20 CON5T—TON I Project No: 62-2151 REFERENCe GODGB 201t2INTERNATIONAL BUILDwb CAOG -'�"--i 2 ]INTERNATIONAL-1-EM..bLODE 2012 MTERNATIONAL FRE GODS 2012INTERNATION.N. RuwB�N6 CODE ]012 MTERNATONAL— AlcALCODE ANBITI NATIONAL ELECTRIC cove . nao5 eomon, rgNSTROGTNJN TYR tlFD I � � AGC�ERwrt eOY.Yvu• 1 I r~9E5P0.MNLER MO FREAL�9 I 1 I I OLLNANCY SROUPEEDWATIONALIDAYCARE (IBC SECTION 900.6. I APPUESTOTwSFACWTY GORE VA PLAIN I 1 1 1 ALLOWABLE AREA 1{,5005F(251ORY1 1/D � 1 -O I i ---------------------- - ACTu.LL 9.55{5F(1 W/WE23AwNE) AREA 1 —1 (SEE SNEET A00{ FOR AREA TABUL./.T10N 1 FIRE AREAS) OGCWANGION 5 NO SEPARATION REONRED(IBC SECTION 5009) FNeENR�E515TAMCE RA„ B RIDR, NON-BEAWNb WALLS FLOORS RATION gSTA— A>-D BEE SITE RAR SNEET A-4 FOR E[TERgR. FFiE AREA WALL —T- --T LAAO NTO D.B.- 2, °09 FAC9Ltt/STAFF ARE REOW9.—T. wOREN ALLOWEDWH 5 (EAT WDOE CYf! C�TO¢ET ROOnS tT-BY FT 1 I LAV PER 15 CHLOR-, NIFANTS) TODDLERS 9 wC / 9 LAV REOLtl9ED, 6 wC / 6 4v PROVIDED ELEwENTARY (t/50 PER IBC CN29,9wC/9LAV REOUI0.ED. TwC,tuRbLAV PROVIDED STAPI (1/]S PER IBC CN 29,2wC/]LAV REOUIRED,9wC,9LwV PROv1DEp 6156 1 PE0. FLOOR REOUtl9ED(Pm—GN ]911 PROv1DED DP. I / I OO ER—ED?ER IBC Cx 29) 2 PRO VIDEO rOOD PRET SINK TODRER(P1EweNTARY 4A55ROOMv xAVEINOIRECT WASTe 5w0.5 POR N10NTE550RI5PEGFIG PRAGTICALLEE SRLLS TNA, INCLINEVebET— PREPARwTIONPER GDPNE 7.11.19. YTEN5v.5 wLL DE WASHED IN THE IACtl.T' PREP DiSxru,SNER OR 5 CANTARTwENT 51KK. CxILOREN DO NOT xAVE A—. ACCESS TO Tw5 ROOOw 1 All iM.w,, d—a wnite5 nn Ni. M.vnlenl is Ne onpjl ullpuhlishedwmkMNrAnhil- Duplrat ,d -I. rt,mu.e MNti wnk Ai_ ft mnxnl n(N A-111 is pwhiblRE. YOLU U M z r LL a 0 a 0 9 e O 3 fi 3 The R T O Group, Ltd. b Architects Date Issue OV14/20 CON5T—TON Project No: 62-2151 Drawing AOO1 - City of Wheat Ridge Commercial Asbestos Abatement PERMIT - 201902457 PERMIT NO: 201902457 ISSUED: 11/21/2019 JOB ADDRESS: 3480 Ames St EXPIRES: 11/20/2020 JOB DESCRIPTION: Commercial abatement 7,076 square feet. *** CONTACTS *** OWNER (303)218-6641 BARRILLEAUX ANDREW SUB (303)410-4941 LYNNELLE BEAVER 180066 COLORADO HAZARD CONTROL LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 501 / BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 38,030.00 FEES Asbestos Abatement 50.00 Total Valuation 0.00 ** TOTAL ** 50.00 *** COMMENTS *** *** CONDITIONS *** All work shall comply 2012 International Codes, 2017 NEC (if applicable), and ordinances adopted by the City of Wheat Ridge. Work is subject to field inspections. 99%9 ature, do hered specificationsilding codes, ave been authorized owner of the pin conjunction with further attest work to be d t�}at aj1, wgrk to be performed is disclosed in this documt and/or its' accompanying approved plans and specifications. G kignature of OWNER or CONTRACTOR (Circle one) (Date I. This permit was issued based on the information provided in the permit application and accompanying flans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signafure ofChef Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City of W he t I OJ COMMUNITY DEVELOPMFNI Building & Inspection Services 7500 W. 29"' Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 ` Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permits(&d.wheatridpe.co.us FOR OFFICE USE ONLY I Date- Plan/Permit # P6 Pian Review Fee: Building Permit Application *** Complete all applicable highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: 3480 Amps St Property Owner (please print): Andrew Rarrilleaux Phone: 303-218-6641 Property Owner Email:�nfn mymidt�wnaradpmy com Tenant Name (Commercial Projects Only) Property Owner Mailing Address: (if different than property address) Address: 1675 W. 67th Ave. Suite 200 City, State, Zip: Denver, CO 80221 Archltect/Engineer E-mail: Phone: Contractor Name: Colorado Hazard- Control Cityof Wheat Ridge License #: ! M `Y� Phone:303-410-4941 Contractor E-mail Address: mpetersonna coloradohazard.com For Pian Review Questions & Comments (please print): CONTACT NAME (please print): Matt Peterson Phone: 303-410-4941 CONTACT EMAIL(please print) _mpeterson(a�coloradohazard.com Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form): Electrical: Plumbing: Mechanical: W.R. City License # W. R. City License # W. R. City License # Other City Licensed Sub: Other City Licensed Sub: City License # City License # Complete all highlighted fields, if applicable. OCOMMERCIAL ❑ RESIDENTIAL Provide description of work: For ALL projects, provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc. Removal and disposal of approximately 3,022 sq. ft. of asbestos containing floor tile, removal and disposal of approximately 3,814 sq. ft. of asbestos containing mastic, and removal and disposal of approximately 240 sq. ft. of asbestos containg glue dots (ceiling tile mastic). Materials to be removed under 4 seperate secondary containments. The building is currently unoccupied. Sq. FULF 7 076 Sq Ft. BTUs Gallons Amps squares For Solar: Kw S of Panels Requires structural For Commercial Projects Only: Occupancy Type: Construction Type: _ Occupancy Load: Square Footage: Project Value: (Contract value or the cost of all materials and labor included in the entire project) 030.00 OWNERICONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. 1, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLEONE.- (OWNS (C NTRACT r A HOR/ZED REPRESENTATIVE) of (OWNER) CONTRACTOR) Signature (first And 1431 oamc): D DATE: Printed Name: ZONING COMMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer. PUBLIC WORKS COMMENTS: Reviewer: DEPARTMENT USE ONLY OCCUPANCY CLASSIFICATION: CONSTRUCTION TYPE: Building Division Valuation: CR m (n 0 c� O v rr CD S O C (o S 1 0 C c� 0 O 0 0 m MR CL O O 0 r r 0 0 N v (n Q. O n O v a c� C2 Cl) lJ v (D O 6- w Q (n n Q u - p fp'. c onrz n m n O n m o O m -u [i o. 1 W _� rn o p cr m <m om�� 3 3 Z 2 m' _ m < (D rt 3 z Z 0 In ,% �+ D m 3 o rr i rD � � � 0, D (D o ti+ T (D [�? D 2�G cD (D 3 m o O n 3 O O O 0 3 r o ' O w m C') 1 (9r. C7 n -P, C7 L m N co In - O N O m O CO 00 Nl G (D 1 w w r 3 2. a� a i @ " O Q oto O7 (D 2 r.. — 0. ,j T V Q 3 7 i z O N ¢; R' CD ° -3 or fn �L fD `, m (D w CO z a D N a x o n w ni vNW:'n (ID m ° D D (D O � n a 0 n cD CSD (D 3 -r d 315 ate. 2 -L CD N o 3 W p3 N Iq $ N O N (:J m � y < OO N (o < p c� _NID � I N N Q i T o o D C ry (D P N o O O O O G n r fo (n a @ Z W v D ca D WtD 3 `° (Dg y m w9 Q 0 � � � � ( Q o N o � < D03 G (D ca- 2 m CrC 3 o Q o � a. C ° Q cn 0)w (n T co (D m CD (n Co v m Q. 0. xt 0 ID — D 'G D o �" v 3 0 � ( O (n N R' o Ofo p m d C C2 '< • `C CD G co d U �m �j(D l/l d l ROZ11N D m M c -4 coo �C$) n C-) 0> 0-4 2 3 < 0 M0 o0 ozm T7 n> r 0 �� m U) M :3 cn D Q Z M 0 n C� Z �r r m n m c0 Z m -n AV90 : 6 6l i '� l 'Al fp'. c onrz ty7 v N o�Nl7 �r50 m AV90 : 6 6l i '� l 'Al t DS (]?.0) NOV 2 1 2019 nvl rQ n e n to �r-------.-- "The trusted choice for your environmental & industrial hygiene needs." !P& ASBESTOS INSPECTION REPORT The Church of Jesus Christ of Latter-day Saints PRESENTED TO: Mr. Andrew Barrilleaux (214) 454-0100 Info(��niymidtovvnacademy.com Front Range 7555 W 101h Ave Suite A, Lakewood, CO 80214 3480 Ames St, Wheat Ridge, Colorado INSPECTED BY: r- .A Mr. Zack Westfall DS Environmental Cell: (303) 304-1329 Mountains PO Box 6864 Avon, CO 81620 PROJECT DETAILS: DS Job Number: 19865 Date of Inspection: July 8, 2019 Western Slope PO Box 3793 Aspen, CO 81612 Web dsconsultinginc.com Direct (303) 286-9094 Fax (303) 986-0121 Table of Contents 1.0 Introduction 2.0 Limitations of Inspection 3.0 Conclusions & Summary of Findings 4.0 Material Information 5.0 Inspector & Firm Certifications R; Ir -` • 6.0 Inspection, Sampli & al u T ProCETlure ., A- 7.0 Recommendations 8.0 Asbestos Abatement & Demolition Requirements 9.0 Major & Minor Asbestos Spill Response Actions 10.0 Project Design & Project Manager Requirements 11.0 Disclaimer & Limitations 12.0 Copyright Notice APPENDIX A CERTIFICATIONS APPENDIX B LABORATORY REPORT 2 1.0 Introduction Mr. Zack Westfall with DS Environmental Consulting (DS) conducted an asbestos inspection and collected bulk - samples of suspect asbestos -containing building materials within the church detailed on the cover page of this report. The purpose of the inspection was to determine if any of the materials that may be impacted by the renovation activities contain asbestos. 2.0 Limitations of Inspection This inspection was limited in its scope and only included specific areas and materials as defined by the client. The inspection did not constitute a full -building inspection and does not fulfill the asbestos inspection requirements for structures that are to be demolished. The table below, (Table 1.0), lists the suspect asbestos -containing materials included in the scope of the inspection. It identifies the specific areas that were included in the inspection as well descriptions of the suspect asbestos -containing materials in those areas that were sampled; or materials that were assumed to contain asbestos. The suspect asbestos -containing materials listed below may be found in other areas of the building that were outside of the scope of work for this inspection and sampling. Additionally, there may be other materials in other parts of the building that contain asbestos, which were not included in the scope of this inspection and sampling. Table 1.0 Scope of Work Suspect Asbestos -Containing Materials Sampled Material Locations Homogeneous Area 1(SM1) Sponge Drywall Texture Walls and Ceilings in Original SouthwestArea of Church, Both Levels Homogeneous Area 2 (JC1) Joint Compound Associated Walls and Ceilings in Original Southwest with SM1 Area of Church, Both Levels Homogenous Area 3 (SM2) Rough Textured Plaster Ceiling in Stage and Gym Area Homogeneous Area 4 (SM3) Roller Textured Plaster Walls and Ceiling in Northeast Area of Church and the Chapel Homogeneous Area 5 (CDW1) Joint t Compound on Drywall UntHomogeneous South Wall in "Mother's Room" Area 6 (BS1) White Brick Sealant South Wall in "Bishop's Office" Homogeneous Area 7 (CBA1) Brown Cove Base Adhesive Walls Upper Level Men's Restroom inOriginal Southwest Area of Church Homogeneous Area 8 (CBA2) Off -White Cove Base Adhesive On the Cabinets in the Northeast Kitchen Area 3 Behind Tan Carpet on Walls in the West Homogeneous Area 9 (WA1) Off -White Adhesive Entrance/Lobby Area Brown Mastic Above 12x12 Homogeneous Area 10 (CTA1) White Ceiling Tiles with Ceiling in Southeast Addition on Church Directional Fissures Brown Mastic Above 12x12 Ceiling in the Upper Level Northeast Room Homogeneous Area 11(CTA2) White Ceiling Tiles with in the Original Southwest Area of the Random Pinholes Church Floors Throughout Except the Gym and Homogeneous Area 12 (CA1) Yellow Carpet Adhesive Kitchen 12x12 Floor Tiles with Gray Floor in the Upper Level Men's Restroom Homogeneous Area 13 (FT1) Streaks and Yellow Mastic in the Original Southwest Area od Church 12x12 White Floor Tiles with Homogeneous Area 14 (FT2) Gray Streaks with Yellow Floor in the Northeast Kitchen Mastic 9x9 Red Floor Tiles with White Under Carpet in the Original Southwest Homogeneous Area 15 (FT3) Streaks and Black Mastic Area of Church, Both Levels 9x9 Red Floor Tiles with Black Under Carpet in the Storage Room to the Homogeneous Area 16 (FT4) Mastic Left of the Stage Attic Above the Upper Level of the Original Southwest Area Homogeneous Area 17 (INS1) Brown Blown -In Insulation Attic Above the East Storage Room off of the Chapel 3.0 Conclusions & Summary of Findings Materials in RED are materials that contain greater than 1% asbestos or are assumed to contain >1% asbestos. 1 ,REED cs)ntaE i t_'','• jos Materials in BLACK do not contain asbestos. Sample Information ACRONYMS ACM ASSESSMENT CATEGORIES CHRY—Chrysotile 1—damaged/significantly damaged thermal system insulation ACM SUMMARY OF ACT — Actinolite 2 — damaged friable surfacing material ACM FINDINGS TR — Trace; >1% Asbestos 3 —significantly damaged friable surfacing material ACM ND — None -detected 4 — damaged or significantly damaged friable miscellaneous material ACM ACM —Asbestos Containing 5 —ACM with the potential for damage Material (>1% asbestos) 6 — ACM with the potential for significant damage Sample Location: Southwest Lower Level 7 — any remaining friable ACM or friable suspected ACM Materials in RED are materials that contain greater than 1% asbestos or are assumed to contain >1% asbestos. 1 ,REED cs)ntaE i t_'','• jos Materials in BLACK do not contain asbestos. Sample Information Material Information Asbestos Content Sample ID: SM1-1 Sample Location: Southwest Lower Level Storage Closet —South Wall Sample ID: SM1-2 V-4 Sample Location: Southwest Lower Level uDescription: Hallway — West Wall Sponge Drywall Texture Q Classification: Surfacing Material Sample ID: SM1-3 Condition: Good 0 Sample Location: Southwest Lower Level Quantit : ^2000 ft2 ND Uj Storage Closet — North Above the Door Friability: Friable O Assessment Category: No Category (Non -ACM) O Sample ID: SM1-4 Reason for Assessment: = Sample Location: Southwest Upper Level Room 201— East Wall Sample ID: SMI -5 Sample Location: Southwest Upper Level Room 202 — East Wall S N NDescription: Joint Compound Associated w/ SM1 X Sample ID: 1C1-1 Classification: Miscellaneous Material Q Sample Location: Southwest Upper Level M Room 203 — Northwest Corner Condition: Good Quantity: ^2000 ft2 ND Uj Uzi Sample ID: JC1-2 Friability: Friable C) O Sample Location: Southwest Lower Level Assessment Category: No Category (Non -ACM) 2 Storage Closet — Northeast Corner Reason for Assessment: x m a Sample ID: SM2-1 Description: Rough Textured Plaster aSample Location: North Stage Ceiling Classification: Surfacing Material w Condition: Good O Sample ID: SM2-2 Quantity: —800 ftz ND Z u, Sample Location: North Stage Ceiling Friability: Friable Sample ID: SM2-3 Assessment Category: No Category (Non -ACM) = Sample Location: North Stage Ceiling Reason for Assessment: Sample ID: SM3-1 d Sample Location: Northeast "Relief Description: Roller Textured Plaster *Uc5 Society" Room - Ceiling Classification: Surfacing Material G Sample ID: SM3-2 Condition: Good O W Sample Location: Northeast "Relief Quantity: —500 ft2 ND Uzi Society" Room - Ceiling Friability: Friable O Assessment Category: No Category (Non -ACM) Sample ID: SM3-3 Reason for Assessment: i Sample Location: East Closet Off of the Chapel —West Round Wall Sample ID: CDW1-1 Ln Sample Location: "Mother's Room" Description: Joint Compound on Untextured Southeast Corner Drywall C Classification: Miscellaneous Material `n � Sample ID: CDW1-2 Condition: Good WO Sample Location: "Mother's Room" ND w Southeast Corner Quantity: —150 ftz O Friability: Friable Sample ID: CDW1-3 Assessment Category: No Category (Non -ACM) = Sample Location: "Mother's Room" Reason for Assessment: Southwest Corner Sample ID: BSI -1 W Sample Location: Bishop's Office" — South Wall Description: White Brick Sealant a a Classification: Surfacing Material Sample ID: BS1-2 Condition: Good LOU Sample Location: "Bishop's Office" —South Quantity: —150 ft 2 ND w Wall Friability: Non -Friable C7 O Assessment Category: No Category (Non -ACM) Sample ID: BSI -3 Reason for Assessment: = Sample Location: "Bishop's Office" —South Wall Sample ID: CBA1-1 r- Sample Location: Southwest Upper Level w Men's Restroom — East Wall Description: Brown Cove Base Adhesive Classification: Miscellaneous Material Sample ID: CBA1-2 Condition: Good ZSample Location: Southwest Upper Level Quantity: —120 ft2 ND LU Men's Restroom — East Wall Friability: Non -Friable C9 O Assessment Category: No Category (Non -ACM) _Reason Sample ID: CBA1-3 for Assessment: Sample Location: Southwest Upper Level Men's Restroom — East Wall Sample ID: CBA2-1 00 Sample Location: Northeast Kitchen Area — Description: Off -White Cove Base Adhesive u East Cabinets Classification: Miscellaneous Material Q Sample ID: CBA2-2 Condition: Good O W Sample Location: Northeast Kitchen Area — Quantity: —40 ft ND w East Cabinets Friability: Non -Friable 0 Assessment Category: No Category (Non -ACM) Sample ID: CBA2-3 Reason for Assessment: xSample Location: Northeast Kitchen Area — East Cabinets Sample ID: WA1-1 rn Sample Location: West Lobby Area — West Description: Off -White Adhesive �`Z,, cr-, Wall Behind Carpet Classification: Miscellaneous Material Q Sample ID: WA1-2 Condition: Good OW Sample Location: West Lobby Area —West Quantity: —500 ft' ND W Wall Behind Carpet Friability: Non -Friable OAssessment Category: No Category (Non -ACM) 2 Sample ID: WA1-3 Reason for Assessment: x Sample Location: West Lobby Area — West Wall Behind Carpet o Description: Brown Mastic Above 12x12 White w Ceiling Tiles with Directional Fissures Sample ID: CTA1-1 Classification: Miscellaneous Material Sample Location: Room 101 Ceiling Condition: Good � Quantity: —700 ft' ND W Sample ID: CTA1-2 t7 Sample Location: Room 101 Ceiling Friability: Non -Friable 0 5 Assessment Category: No Category (Non -ACM) 0 x Reason for Assessment: Description: Brown Mastic Above 12x12 White Sample ID: CTA2 1rl Ceiling Tiles with Random Pinholes r4 Sample Location: Southwest Upper Level — Northeast Room Ceiling Classification: Miscellaneous Material Uj Condition: Good (,n Sample ID: CTA2-2 Quantity: —120 ft' %S 0 Sam le Location: Southwest Upper Level — Friability: Non-Friable / 2% CHRY LZ Northeast Room Ceiling Assessment Category: (5) 0 Reason for Assessment: Sample ID: CTA2 3 Potential for Contact: High Sample Location: Southwest Upper Level — Northeast Room Ceiling Potential for Vibration: Low Potential for Air Erosion: Low Sample ID: CAI-1 -, Sample Location: West Lobby Closet Area 4 Floor Description: Yellow Carpet Adhesive QClassification: Miscellaneous Material Sample ID: CA1-2 Condition: Good O Sample Location: West Lobby Closet Area Quantity: —2000 ft' ND w Floor Friability: Non-Friable c� O Assessment Category: No Category (Non-ACM) Sample ID: CA1-3 Reason for Assessment: _ Sample Location: West Lobby Closet Area Floor Sample ID: FTI-1 rq Sample Location: Southwest Upper Level Description: 12x12 Floor Tiles with Gray Streaks W Men's Restroom Floor and Yellow Mastic Q Classification: Miscellaneous Material Sample ID: FT1-2 Condition: Good D Sample Location: Southwest Upper Level ND Z Mens Restroom Floor Quantity: —120 ft Z 0 Friability: Non-Friable O 2 Sample ID: FTI-3 Assessment Category: No Category (Non-ACM) x Sample Location: Southwest Upper Level Reason for Assessment: Men's Restroom Floor .tr Description: 12x12 White Floor Tiles with Gray ¢Streaks Sample ID: FT2-1 and Yellow Mastic a Sample Location: Northeast Kitchen Floor Classification: Miscellaneous Material Sample ID: FT2-2 Condition: Good ND Uj Sample Location: Northeast Kitchen Floor Quantity: —200 ft' z (Uj D Friability: Non -Friable 0 Sample ID: FT2-3 Assessment Category: No Category (Non -ACM) 0 0 Sample Location: Northeast Kitchen Floor Reason for Assessment: x Description: 9x9 Red Floor Tiles with White Sample ID: FT3-1�s �IX9 Streaks and Black Mastic Sample Location: Southwest Upper Level Classification: Miscellaneous Material w Attic Access Closet Floor Condition: Good d 30 C�3% Sample ID: FT3-2 Quantity: 1200 ft` CHRY in 0 Sample Location: Southwest Upper Level Friability: Non -Friable Tile 5% CHRY in Attic Access Closet Floor Assessment Category: (5) Mastic 0 0 Reason for Assessment: Sample ID: FT3-3 Potential for Contact: High flSample Location: Southwest Upper Level Potential for Vibration: Low Attic Access Closet Floor Potential for Air Erosion: Low Sample ID: FT4-1 Sample Location: Northwest Storage Description: 9x9 Red Floor Tiles with Black Mastic Room to the Left of the Stage — Floor— Classification: Miscellaneous Material rq < Under Carpet Condition: Good d Sample ID: FT4-2 —200 Quantity: ft' g� ° 3CHRY in /° tn Sample Location: Northwest Storage Friability: Non -Friable Tile LU Room to the Left of the Stage — Floor — Assessment Category: (5) 5% CHRY in Under Carpet Reason for Assessment: Mastic C7 Potential for Contact: High 0 Sample ID: FT4-3 Potential for Vibration: Low Sample Location: Northwest Storage Roorn to the Left of the Stage — Floor — Potential for Air Erosion: Low Under Carpet 10 11 Sample ID: INS1-1 qr_'q Sample Location: Southwest Upper Level Attic Description: Brown Blown -in Insulation W Classification: Miscellaneous Material a Sample ID: INS1-2 Condition: Good O Sample Location: Southwest Upper Level Quantity: —3000 ftZ ND U, Attic Friability: Friable C4 O Assessment Category: No Category (Non -ACM) O Sample ID: INS1-3 Reason for Assessment: = Sample Location: Attic Above East Storage Room Off of the Chapel 11 4.0 Material Information A Homogeneous Area (HA) means an area of surfacing material, thermal system insulation material, or miscellaneous material that is uniform in color and texture. The asbestos content of the bulk -samples collected within a homogeneous area can be applied to the entire homogenous area, if they conform to the above characteristics and the regulated minimum sample quantities of each type of material have been collected and analyzed. An Asbestos Containing Material (ACM) is a material that contains more than 1% asbestos. Any material can be assumed to be an ACM, but not the contrary. 4.1 Material Friability A material can either be friable or non friable. A friable material is one that, when dry, can be pulverized, or reduced to powder by hand pressure, a non -friable material cannot. A non -friable material may become friable if its condition had deteriorated or has been impacted by forces that have rendered it friable. 4.2 Material Classifications Sampled materials are divided into one of the following three categories: • Surfacing Material: sprayed or troweled onto structural building members • Thermal System Insulation (TSI): any type of pipe, boiler, tank, or duct insulation • Miscellaneous Material: all other materials not classified in the above two categories 4.3 Material Conditions Sampled materials are placed into one of the following three categories of conditions: • Good: none to very little visible damage or deterioration • Damaged: the surface is crumbling, blistered, water -stained, gouged, marred or otherwise abraded over less than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the damage is localized • Significantly Damaged: the surface is crumbling, blistered, water -stained, gouged, marred or otherwise abraded over greater than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the damage is localized 4.4 Sample Quantities DS collected at least the minimum number of samples from each homogeneous area necessary to meet all regulatory requirements for the quantity of material to be disturbed in the scope of work as defined by the client. The quantities listed in this report are approximate and on-site verification of the exact quantity of each material is required for permitting, estimating and billing purposes. The following outlines the minimum sample quantities required per homogeneous area: • Surfacing Materials: up to 1,000 ftz of material requires a minimum of three (3) samples; between 1,000 ftz and 5,000 ftz of material requires a minimum of five (5) samples; over 5,000 ft2 of material requires a minimum of seven (7) samples; one (1) sample of each patch • Thermal System Insulation (TSI): each homogeneous area requires a minimum of three (3) samples; at least one (1) sample must be collected from each patch; and collect enough samples sufficient to adequately assess the material and determine the asbestos content for TSI fittings such as pipe elbows or T's, which a minimum of two (2) samples of each 12 • Miscellaneous Materials: collect enough samples sufficient to determine the asbestos content with a minimum of two (2) samples of each 4.5 Materials Reporting "TRACE" Results Any sample reporting a "TRACE" amount of asbestos shall be considered to contain greater than 1% asbestos unless it is further analyzed utilizing the point -count method and verified to be less than or equal to 1% asbestos content, and therefore not an ACM. TRACE does not mean it contains less than or equal to 1% 4.6 Materials Containing 1% Asbestos or Less Materials containing less than or equal to 1% asbestos are not regulated by the Colorado Department of Public Health and Environment (CDPHE) Regulation 8, Part B — Asbestos. However, all demolition/abatement activities should be performed following the applicable Occupational Safety and Health Administration (OSHA) regulations. This includes, but is not limited to, the appropriate asbestos training for the type of material being removed/disturbed as well as having a properly trained supervisor onsite, using wet removal methods, wearing adequate personal protective equipment (NEPA-filtered particulate respirators), medical surveillance of workers, personal -exposure air monitoring, area air monitoring in occupied buildings, etc. There may also be landfill disposal requirements for these materials, depending on the facility. DS recommends that all demolition/renovation projects involving the disturbance of any amount of asbestos be subjected to post - work visual inspections and a final clearance air testing by a CDPHE-certified Asbestos Air Monitoring Specialist (AMS) after the work has been completed, but before any containments are dismantled, the contractor demobilizes, and the area is reoccupied. 4.7 Overspray Any surfacing material indicated in this report also includes any associated overspray of that material, e.g., under carpet, above suspended ceilings, on studs and structural members, etc. 5.0 Inspector & Firm Certifications The inspection detailed within this report was conducted by Mr. Zack Westfall with DS. DS is a CDPHE certified Asbestos Consulting Firm, Registration No. 14912. Mr. Westfall is a CDPHE certified Building Inspector; having certification number 22529 (see Appendix A for certificates). 6.0 Inspection, Sampling & Analytical Procedures 6.1 Inspection Procedures The asbestos inspection detailed in this report was conducted by an Environmental Protection Agency (EPA) and CDPHE certified asbestos Building Inspector. The inspection procedures included identifying and sampling suspect ACM within the pre -defined areas that were within the scope of work, submitting samples to an accredited laboratory for analysis, classifying the materials and assessing their condition, and compiling a final report detailing the inspection and the analytical results of the bulk -samples. 6.2 Sampling Procedures Statistically random bulk -samples representative of the suspect ACM of each homogeneous area were collected according to the guidelines published in the Environmental Protection Agency's October 1985 publication, "Asbestos in Building: Simplified Sampling Scheme for Friable Surfacing Materials", commonly known as the "Pink Book." 13 DS has collected the appropriate number of bulk -samples to meet all regulatory requirements for the classification and quantity of each homogeneous area. All reasonable efforts were made to identify homogeneous areas and to sample or assume suspect materials. Destructive investigation was conducted whenever feasible, and every effort was made to locate and quantify suspect ACM within the scope of work. Any material not identified and sampled in this report shall be assumed to be an ACM or shall be sampled by an EPA -trained and CDPHE-certified inspector and submitted for analysis. 6.3 Analytical Procedures All asbestos bulk -samples were analyzed by a third party, National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory via Polarized Light Microscopy (PLM) for asbestos content per CDPHE Regulation 8 (see Appendix 8 for laboratory report). 7.0 Recommendations The asbestos inspection detailed in this report did identify ACM(s); therefore, professional abatement activities are required to remove or disturb the above -referenced asbestos -containing materials. 8.0 Asbestos Abatement & Demolition Requirements If ACM is to be removed or disturbed in a single-family residence, and the total quantity exceeds any of the regulatory trigger levels of 50 linear ft. on pipes, 32 ft' on other surfaces, or the volume equivalent of a 55 -gallon drum, a CDPHE-certified General Abatement Contractor (GAC) is required to perform the work. The regulatory trigger levels within a commercial building are 260 linear ft. on pipes, 160 ft2 on other surfaces, or the volume equivalent of a 55 -gallon drum. In addition, formal notification to CDPHE prior to the abatement of ACM as well as air monitoring, visual inspections, and final air clearances by a CDPHE-certified Asbestos AMS is required. DS can provide the client or building owner with a proposal for project design, abatement oversight and air monitoring upon request. CDPHE regulations allow for the demolition of a building that contains non -friable asbestos -containing materials, such as caulking, mastic or resilient floor tiles. However, demolition must be completed without causing the non -friable ACM to be rendered friable. Burning a building with any ACM is prohibited. Operations such as sanding, cutting, crushing, grinding, pneumatic jacking, etc. of ACM are not permitted. Recycling of building materials such as concrete, metal, or wood that are bonded or contaminated with ACM, e.g. glue, caulking, or mastic is also prohibited. If any of the non -friable asbestos containing materials are to be recycled and rendered friable after demolition (i.e. crushing mastic -coated concrete), these materials must be abated of all ACM prior to shipping offsite for recycling. OSHA regulations regarding occupational exposure during demolition activities is still mandatory. OSHA 29 CFR 1926.1101 requires that workers performing construction -related activities be protected from asbestos fibers in excess of the permissible exposure limit of 0.1 f/cc of air. Contractors are must comply with applicable provisions of OSHA 29 CFR 1926.1101 during demolition and renovation activities. These OSHA provisions include, but are not limited to, PPE and respirators, personnel training, personal -exposure air monitoring, employee medical surveillance, wet removal methods, signage for regulated areas, etc. 14 9.0 Major & Minor Asbestos Spill Response Actions If ACM is significantly damaged and the total quantity exceeds the regulatory trigger levels, the area is deemed a "Major Asbestos Spill." The area is consequently subject to the requirements in Reg. 8, Section III.T.1. — Major Asbestos Spills, as outlined below. Additional asbestos air or dust sampling should also be conducted within the remaining areas not directly impacted by the Major Asbestos Spill to determine if asbestos -containing dust/debris has spread to adjacent areas. If asbestos fibers are found within any other areas or on building contents, they should be included in the scope of professional abatement and decontamination. The following response actions must be followed per Colorado Reg. 8 when a Major Asbestos Spill occurs: • Restrict access to the area and post warning signs to prevent entry to the area by persons other than those necessary to respond to the incident. • Shut off or temporarily modify the air handling system to prevent the distribution of asbestos fibers to other areas. • Immediately contact the Division by telephone, submit a notification in compliance with subsection III.E. (Notifications) and, if in an area of public access, apply for a permit in accordance with subsection III.G. (Permits). • Be exempted from the requirements to have a certified Supervisor on-site at all times, until such time as the immediate danger has passed. Any cleanup or asbestos abatement that must occur after the immediate danger has passed shall be supervised by a person certified by the Division. • Using certified Supervisors and certified Workers in accordance with section II. (Certification Requirements) of this Regulation, seal all openings between the contaminated and uncontaminated areas and establish negative air pressure within the contaminated area in accordance with paragraph III.J. (Air Cleaning and None -detected Pressure Requirements). This is to be accomplished using polyethylene sheeting to cover areas such as doorways, windows, elevator openings, corridor entrances, grills, drains, grates, diffusers and skylights. • HEPA vacuum or steam clean all carpets, drapes, upholstery, and other non -clothing fabrics in the contaminated area, or discard these materials. • Launder or discard contaminated clothing in accordance with subsection III.R. (Waste Handling). • HEPA vacuum or wet clean all surfaces in the contaminated area. • Discard all materials in accordance with subsection III.R. (Waste Handling). • Following completion of subparagraph III.T.1.a. through III.T.1.i. above, comply with air monitoring requirements as described in subsection III.P. (Clearing Abatement Projects); air samples shall be collected aggressively as described in 40 C.F.R. Part 763, Appendix A to Subpart E (EPA 1995), except that the air stream of the leaf blower shall not be directed at any friable ACM that remains in the area • Comply with any other measures deemed necessary by the Division to protect public health. In the event of an asbestos spill involving less than or equal to the trigger levels, the building owner or contractor should take the following non -mandatory steps: • Restrict entry to the area and post warning signs to prevent entry to the area by persons other than those necessary to respond to the incident. • Shut off or temporarily modify the air handling system to prevent the distribution of fibers to other areas in the building. • Seal all openings between the contaminated and uncontaminated areas. This is to be accomplished by using polyethylene sheeting to cover all areas such as windows, doorways, elevator openings, corridor entrances, drains, grills, grates, diffusers and skylights. 15 • HEPA vacuum or steam clean all carpets, draperies, upholstery and other non -clothing fabrics in the contaminated area or discard all contaminated materials in accordance with subsection III.R. (Waste Handling). • Launder or discard contaminated clothing in accordance with subsection III.R. (Waste Handling). • HEPA vacuum or wet clean all non -fabric surfaces in the contaminated area. • Following completion of subparagraphs III3.2.a. through III.T.2.f. of Regulation 8, conduct air monitoring as described in paragraph III.P.3 of Regulation 8. (Final Clearance Air Monitoring and Sample Analyses); air samples shall be collected aggressively as described in 40 C.F.R. Part 763, Appendix A to Subpart E (EPA 1995), except that the air stream of the leaf blower shall not be directed at any friable ACM that remains in the work area. 10.0 Project Design & Project Manager Requirements DS can provide an Asbestos Abatement Project Design as well as fulfill the Colorado Asbestos Abatement Project Manager requirements for any asbestos abatement project, as applicable below. Project Design An abatement Project Design is an accurate and detailed scope of work, which includes project specifications and procedures, containment design/equipment placement, and descriptions of engineering controls and work practices for an asbestos abatement project or response action that is required by CDPHE Regulation Number 8, Part B - Asbestos (Reg. 8) on large asbestos abatement projects. Prior to the start of any asbestos abatement project in a non -school building, where the amount of asbestos -containing material (ACM) to be removed or disturbed exceeds 1,000 linear feet on pipes, or 3,000 square feet on surfaces, or in a school building in which the amount of friable ACM to be abated exceeds 3 linear feet on pipes, or 3 square feet on surfaces, a written Project Design must be developed by a State of Colorado certified Project Designer in accordance with subsection IV.G.7 of Regulation 8. A signed copy shall be posted on-site prior to commencing any abatement activities, shall be available on-site at all times, and shall remain onsite until final air clearances have been completed by a State of Colorado -certified Air Monitoring Specialist (AMS). Project Manager A Project Manager shall be used on all asbestos abatement projects in which the amount of friable asbestos - containing material to be abated exceeds 1,000 linear feet on pipes, or 3,000 square feet on other surfaces per CDPHE Regulation Number 8, Part B — Section III.6.6. An asbestos Project Manager on an abatement project shall be responsible for assessing that the project is conducted in accordance with Regulation 8, assessing that the Project Design is followed, assessing that the abatement project is cleared in accordance with Regulation 8, assessing that the asbestos waste generated on the project is properly manifested and disposed of in accordance with Regulation 8, and communicating these assessments to the building owner or GAC. Project Managers must have proof of Colorado certification as an asbestos Project Designer and Air Monitoring Specialist in accordance with Section II of CDPHE Regulation 8 as well as a minimum of one (1) year of experience supervising, overseeing or monitoring asbestos abatement projects. A 4 -year college degree in industrial hygiene, a degree in environmental health with a major concentration in industrial hygiene, or the possession of a certified industrial hygienist (CIH) certificate given by the American Board of Industrial Hygiene (ABIH) may be substituted for the Colorado asbestos Air Monitoring Specialist certification. 16 The GAC shall notify the building owner during the bid process as to whether a Project Manager is required. Project Managers shall be independent of the asbestos abatement contractor and work strictly on behalf of the building owner to the extent feasible unless the abatement is being performed in-house. Project Managers must sign the original copy of the abatement permit for the permit to be valid, and before any abatement can take place. 11.0 Disclaimer & Limitations The activities outlined in this report were conducted in a manner consistent with a level of care and expertise exercised by members of the environmental consulting and industrial hygiene profession. All activities were performed in accordance with all applicable federal, state, and local regulations as well as generally accepted standards and professional practice. No warranty is either expressed or implied. DS assumes no responsibility or liability for error in public information utilized, statements from sources other than DS, or developments resulting from situations outside the scope of work for this project. The details provided within this report outline the inspection activities on the date(s) indicated and should not be relied upon to represent conditions at a later date. The laboratory results contained in this report apply specifically to the materials in which bulk -samples were collected. The results do not include or apply to any other materials within the structure that were not sampled but may contain asbestos; including materials that may be hidden or inaccessible. Additional inspection and bulk -sampling activities by a certified inspector would be required to determine whether any other materials contain asbestos. This report has been prepared on behalf of and exclusively for use by the DS's client, with specific application to their project as discussed in the scope of work. The information contained in this report is intended as supplementary material for abatement design and is not to be used as the sole means to develop the scope of abatement activities, bidding or billing purposes. Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. DS can provide a full scope of work for abatement upon request. DS does not warrant the work of regulatory agencies, laboratories or other third parties supplying information which may have been used in the preparation of this report. 12.0 Copyright Notice © DS Environmental 2019. All Rights Reserved. This document contains material protected under Federal Copyright Laws. No part of this document or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author and DS Environmental. 17 J) O 11 N o0 0o O O o0 O O N 4 c.� 0000— E � � v o O -ii v -ci •n p c V y Col.R U — V u'a U C/ v U U U y C C rC c w O U O N C? cc C o 0 Q 4.. ate+ uuj cd F d u �+ z U v m D] 0 N �o c 0 Q L' O on 00 . W �3 33Q Q� s LLJ CD o a L.J 0. Q J N 4 M M C0.i.1 IN u N .�17, z CZ a C Cd UinUQU [=� r_ 0 X .R iC V O U 7 V 0 Q � a a z R a 0 L Q •O Q o z z z z z z z z z z op 0 ami O O ,�, In, In Vl O O a b g� z z z z z z z z T C C C c a ca ci R �- R �- � a a nL G lu 3 3 c N 'a � �3 a s •3 -S ca a o a s R a •� � .y 3 .� E •3 3 'v o a o o a °�' a c a o Im.a 0. 3 3 3 3 3 z o 0 0 0 0 0 0 O O O V M 00 MM N °O 00 M 00 M M 00 00 .c c 6 CO CD0 0 00 0 00 0 00 0 00 0 00 0 n U w c n b �I r to :✓: ✓; :/: ✓: — m a a v oo� o oo� F N O r r c O. y v^ O O O O E o -o t0 p o U Q 2 r N U v U Y c N O y Q O c 0 E r ,o O G E N 5 0 N O y � CQ L' o w o v u i > � d z U = v m Y m 0 a a O c 0 H d 01 on E •O r- ,00 E v ev o G Q E O c CU oa E•!.J p r M LU C z a J r/ ca a+ z ro 9 6 ami o � o e � U Linz (✓ _o co E O U 7 Y E CL oda z y O y 'J c � o a z U G 0 Q D O z z z T % z z z z z. N .D Q c ` a Oo N o [� — c E 0. z z z z z z z z z z z oar c c_ c _ _ � o 3 j 3 3 v o 13 p a 5 a 9: 3 " 7 N V y 3 2 cz .D a 3 3 3 3 3 3 E< m W � o Q U < N z o 0 0 o 0 0 0 v � cl ;D 00 O rq00 00 �7 00 r7 00 r1 00 M 00 E N V) 00 N 00 N N N00 W 00 00 00 o t v a ^' rl r. N rte. ^•co (`I y ,_N•�� `J •N•�� rel rCC!� r^, U VD L'M Q oo� W W O O W to O N O O N d F v r r r C o 0 b 0 0— E U •o -o •o •v �j c N _ O U a UCGQCL� C U J: O F� C D s ,o E c O O CQ G O CD CL •°J• w A ti u �a i > d z U OB m -14 m E 0 6 w. O c 0 c cl L C USN m� 11) E 0 CD ¢ V L:J > O Q cux o �i a X U o0 O W D r —1 N M M W Q uj Cj E R U <a b V L 7 z m CZQ" ami -o U�nUQ V F=� 0 N O U � V � � R oda z 0 N D Q i x V N O O pU. Z c U a 0 lu Q V N o N z z z 1 z z z z z z Q bq N N GU. E � � c c o Q- ca CIO o @' o o 3 w o R a 3 y ¢ n •3 `] v •3 'V ro co aj s 'g � c :c a � Fc- y � 3 w 3 0 M 0 M 0 M 0 M 0 M 0 M 0 M 0 M 0 M 0 E 00 00 00 00 00 00 00 00 00 00 00 00 W o`oo 00 M 00 a v o 0 0 0 0 0 0 0 0 0 a o a rn a o rn rn V ,j c -o a. qN 7 N 3 C — 3 fc U � n a li a x � u . n' � a 'fit Uw� O�»h'xw'"f M1 " N TO �00oo� o g o y y > O U U ¢ ,� 7 � o id c0 cd cd 7 pC]p� m 0 Q 0 c O G CrO. �c G E O c 0 0 N C? CD 4..� �V1 z •Op G v N v LU y cc ce L � U = v m 7 m E 0 a •o 0 c a a � CS1 on a �O C 0 m' N E A O •p LLJ vicD i Y V .00 O � Uc� © U.•,1 r --1 N r�i r��f LU E L : R < / z J yyN •O c 7 � � c UinUQU Fes- � a quo U o a 22 E U 7 � z 0 N O ;a � t; c o O 0. z b0 (Q C U n. N Q �v O Q N T- - � c O C F F } z z z z z < r z r z O C n t ca o E S a ai ca r U 3 8 3 c m 3 c a o a o o rocli co C7 t c o 0 U U LSP U O E V1 V1 Ic o0 oo M Oc o0 M oO 00 r1 oO 00 r7 oO 00 r1 oO 00 r7 oOoO 00 M Oo oc M 00 f7 oO 00 M oO 00 E N O N O N O N O N O N O N O N O N O N O O C, O, Ol O� (ate U t;. a r d K E roLn N M _ N ^n U U t N v v a whr Cl 0000°i A 9 c op U N .0 � > pOp •� d E a U —� n o � >3 33a Ill N N Y O V, V Y U o0 �r.O-7Nr�n 0 x.ro' N 0 O J r 22 o U 3 � co — Q — — — z a ca ca � a Q U o a z m r U O ti N `z o y z z z z z z z z z Q c co j, C o 0 o O cJ 0 0 o o n 0000 oo 00 0 N 0 0 0 0. E o� z z z z z z z z z z >, G a E � 3 � u y � L ° 0 0 � 3 3 3 U v � bA a 3 E rn o o ¢ Q m Q oob ^ om N N N N N N N O O O O O O O O O O llO 00 00 10 00 00 00 00 oo IO 00 �c 00 M 0000 C V] O O O N O O O O O O w c a c0 N f�1 N 7 — G � �a q O O ^ N rr�c�L�o 0000°` Le 0 U c o U d) N N E s o U w ti 0 0 y U o w �3 33a Ct] V1 U Y O V Y U 00 P -9 N M d E z O .O Q O O 0 X <d U � N O ro ca D O C O C O C C � L U z °- oOL OL c y C O C.. z . o°bn a 0 yy i Q v 1. z z z ! z z z z z Q U a E Z o � v 2 z X. z z z I z z z z U � C � a U iC io iC � u � _ v U o � O G � rn O cNC v� O cNd n N 7 � A G O O O a tz c C co s - v s 3 ami x 3 y ce3 ne. Q U U U n U cd m cC m :d co 3 a 3 v � � < E � M v¢i vG^i .¢o O O O O O O O O O O 00 �c 00 �c 00 �c 00 :c 00 00 00 10 00 10 00 10 00 O E N N N Cl N N N N N N N O � N a Efq N M ^ N cn Q Q Q U u 3 3 N 0 m a ft- 0 U 7 N O A CIS z 0 ti V Y Cz. � o a z c G 0 ¢ a ° y ti z z z z r z z z m m o A b o c c T 0. y Ln +�' L O ° s 3 3 a a 3 cl CL F- V T a 3 , 3 y E W U Q o z N N ao N 0o 00 N a N cs N o M c r1 M M O M O M O O O O O O O O 00 00 M 00 r1 00 r^ 00 M10 00 M 00 M 00 M 00 00 GcaN N N N N N N N N N O cs O\ U w � b n. a`rnrnrno 00 0o O O o0 O O — — N rrr;c:C� 0 0 0 0 r.. U C �n tA t..+ v iia G Q U LLJ V_ o rn 0 o U � U z O N c�V U1 U U L2 0 o c z bU➢ A C a c N Q N N N v u o — — L Q W C y cuco _ a d ° c J z z z z o } N A OJ O F V U U "Al u o G (— C Q o 3 N o L o 0 0 °' T a Q 00 m 00 Z o 0 0 0 0 0 0 0 0 0 00 E 00 OC 00 00 00 00 x x 10 00 G y o 0 0 0 0 0 N N N N ° rn U U d _ Q Q Q — — U 00 00 0o O O o0 O O N E 'CJ X � c U N= Y O � � O O O Cl O O O O z Y Z c Y 0.Y. O M � M y Q o z z z z z z x x z x U U o, b °o r o O � N � R n. E z o=r z z z z z z Z Z z 7_ a b O N (� � f•-" � fCCd c O OO O O L q L O J C U T C m O O ¢ m N rrr Q m U Q c o 0 M oO oc M CO Cc M oc M 00 M L N N N N (N OCD r14 O 00 N 00 N oc N N ro �U G U.... u.. L i..-. L i.].. L- M N a O W 00 C) C) w O O7 - N r r r r Ci O O O O U MW ai E Z O Q 4. O O 0 x7i� O U � U c � � 0 � N O 0�. z Clb O h Q g x z = = z z x x z = Q a :L u 3 s o ct a m n � vi Uc z rr E kc, O 7 R 7 o0 "1 O O O OO en O M M OM M E 00 000 000 0000 000 o` oo 000 x 0000 000 C N N N N N N N N N N U —7 v a En �..� CL LL s 0 X N U � N O cls O'� C kn p O 0. z � cya o a z N v 0 v Q U V Q p a co n. O CO :e cJ cd R U R O T a OUO 42NO t -- '^ N v vIT 00 00 00 0000 N N N c cca o 0 0 0 w c a MN Ln77 M N M U 6�i. fi z Z z N a o�o.rnrn� 00 0o O O � O O N rCD r r O O O O MY C]P3NM E I 6 0 O ¢ CL v m m E O .D 0 8 O4 r U E C ca cEa U 'p E b r' U C vOi O r � � C c y � � •y p b = 'b T � O ro �+°- cc U $ a o co v c D CIO �o U v U ca rn � rL-„ � � • C O Z O E V7 O ro -p p N Ute+ tU. y Z T ?� 75 0 U £ C n > U O U U d U 'D C N to O 0 U NO y = N d O U U p N y N o 3 O :a c o o aj •�" � U L QNJ ti C t C U ca U G vi .0 cc Q co y; ro A O Q ti o a e .. C E EtD On O co �' a`0.i T U W m cc O> C O Ca E o X ca y E a> c � 4. O cJ Tc0 yU, r" 0. O c -0 > m .n v W E E $ 4' a ro 0. O vOi N c0 ... 0. h N 0 —M tl L $ On °a C s E o 3 v o4 E ro � � .Y o to a4 c V bpA N h v E u 00 N rn 0. C t-. j U C Y a Q a� E =w `c ° a 0 � Q ..1 E N z C N O Q U > -o Q' O>n o . I INSPECTION RECORD Inspection online form: http://www.ci.wheatridge.co.us/inspection Cancellations must be submitted via the online form before 8 a.m. the day of the inspection Inspections will not be performed unless this card is posted on the project site Request an inspection before MIDNIGHT (11:59 PM) to receive an inspection the following business day PERMIT:,1�6)8`66 ADDRESS: '-3/&b JOB CODE: Foundation Inspections Date Inspector Initials Comments 102 Caissons / Piers 202 Sewer Underground Int. 103 Footing / P.E. Letter 203 Sewer Underground Ext. r 104 Foundation Setback Cert. 105 Stem Walls 304 Sheer Inspection 206 Water Underground 106 Foundation wall Insulation 305 Insulation Do Not Pour Concrete Prior To Approval Of The Above Inspections Underground / Slab Inspections Date Inspector Initials Comments 201 Electrical / Cable/ Conduit 301 Rough Framing 202 Sewer Underground Int. 302 Wall Sheathing 203 Sewer Underground Ext. 204 Plumbing Underground Int. 205 Plumbing Underground Ext. ' "}- 304 Sheer Inspection 206 Water Underground 305 Insulation Do Not Cover Underground or Below / Ire -Slab Work Prior To Approval Of The Above Inspections Rough Inspection Date Inspector Initials Comments 301 Rough Framing 302 Wall Sheathing 303 Roof Sheathing 304 Sheer Inspection 305 Insulation 306 Mid -Roof 307 Metal / Lath / Stucco 308 Rough Electrical Residential 309 Rough Electrical Commercial 310 Electrical Meter Residential 311 Electrical Meter Commercial 312 Temp. Const. Meter 313 Rough Plumbing Residential 314 Rough Plumbing Commercial 315 Shower Pan SEE OVER FOR ADDITIONAL INSPECTIONS 1PERMIT: -,��aoo ADDRESS�-3�n /"�47 - JOB CODE: Y+.moi i� Rough Inspection (continued) Date Inspector Initials Comments 316 Rough Mechanical Residential 317 Rough Mechanical Commercial 318 Boiler / Furnace 319 Hot water tank 320 Drywall screw and Nail 321 Moisture board / shower walls 322 Rough Grading 323 Miscellaneous Final Inspections Date Inspector Initials Comments 402 Gas Meter Release 403 Final Electrical Residential 404 Final Electrical Commercial 405 Final Mechanical Residential 406 Final Mechanical Commercial 407 Final Plumbing Residential 408 Final Plumbing Commercial 409 Final Roof 410 rirlal'wiHUM/Door 411 Landscape/Park/Planning* Inspections from these entities shall be requested one week in advance. *For landscaping and parking inspections please call 303-235-2846 **For ROW and drainage inspections please call 303-235-2861 ***For fire inspections please contact the Fire Protection District for your project. 412 Row/Drainage/Public Works'`* 413 Flood plain Inspection** 414 Fire Insp. / Fire Protection*** 415 Public Works Final** 416 Storm Water Mgmt.** 417 Zoning Final Inspection* 418 Building Final Inspection Note: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not constitute authorization of occupancy. For Low Voltage permits please be sure that rough inspections are completed by the Fire District and Electrical low voltage by the Building Division. City of Wheat Ridge Commercial Miscellan PERMIT - 201800356 PERMIT NO: 201800356 ISSUED: 02/05/2018 JOB ADDRESS: 3480 Ames ST EXPIRES: 02/05/2019 JOB DESCRIPTION: Emergency water line repair 10 inches long 5 deep in yard only. *** CONTACTS *** OWNER (303)801-7483 CORP OF PRES BISHOP OF L D S SUB (720)434-3406 Anthony Akers 150036 Master Excavating LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 501 / BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 900.00 FEES Total Valuation 0.00 Use Tax 18.90 Permit Fee 40.10 ** TOTAL ** 59.00 *** COMMENTS *** *** CONDITIONS *** I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owge�r of the property and am authorized to o�kslairj this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to inclp� de all entities named within this document as parties to the work to be m perfo e� and �' t all work to be perfo-need is di close in this document and/or its' ecom ` nying approved plans and specifications. a /G Signature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanying dans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpennit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of !c��it shall not be Construed to be a permit for or an approval of, an violation of any provision of any applicable codeor any ordinr regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City of .. Wheat f kjjgc COMMUNITY DEVELOPMENT Building & Inspection Services Division 7500 W. 29" Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: perm its(a)_ci.wheatridge.co.us FOR OFFICE USE ONLY Date: Plan/Permit # � jrD���� Plan Review Fee: Building Permit Application " Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: Property Owner (please print): �� l (J� Phone: �' ) 01 '` A/K Property Owner Email: Mailing Address: (if different than property address) Address:Q` City, State, Zip: Arch itect/Engineer: Architect/Engineer E-mail: Contractor: Phone: Contractors City License #:(��}��'� Phone: Contractor E-mail Address: Sub Contractors: Electrical: W. R. City License # Other City Licensed Sub: City License # Plumbing: W. R. City License # Other City Licensed Sub: City License # Mechanical: W. R. City License # Complete all information on BOTH sides of this form �QMMERCIAL ❑ RESIDENTIAL Description of work: (Check all that apply) ❑ NEW COMMERCIAL STRUCTURE ❑ ELECTRICAL SERVICE UPGRADE ❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING ❑ COMMERCIAL ADDITION ❑ RESIDENTIAL ROOFING ❑ RESDENTIAL ADDITION ❑ WINDOW REPLACEMENT ❑ COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT ❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT ELECTRICAL SYSTEM/APPLIANCE REPAIR or REP CEMENT �THER (Describe) l J1C , 1 n� (For ALL projects, please provide a detailed description of wA to be perform d, includingcurreni use of Areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc.) Sq. Ft./LF Amps Btu's Squares Gallons Other ProjectValue: (C,ontract value or the cost of all materials and labor included in the entire project) OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. 1, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLE ONE: (OWNER) (CONTRACTOR) orq(AUTHORIZED REPRESENTATIVE)-) of (OWNER) (CONTRACTOR) Electronic Signature (first and last name �DATE: ZONING COMMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer: DEPARTMENT USE ONLY OCCUPANCY CLASSIFICATION: Building Division Valuation: $ WHEAT RIDGE FIRE PROTECTION DISTRICT DOING THE RIGHT T14INCS AT T14E RIGHT TIMES FOR THE RIGHT REASONS 3880 Upham Street Wheat Ridge, Colorado $0033 ar ph.303.403.S900 * www.wrfire.org :1 M l rill E 00322EHIM 19 aWKW" VW[190E. REV 12/2012 Man Review Report 1 of 1 WHEAT RIDGE FIRE PROTECTION DISTRICT PLANS ARE APPROVED AS SUBMITTED PLANS ARE CONDITIONALLY APPROVED. See Plan Review Comments below. A response Is not required A response is required. Submit an itemized response correlated to the remarks listed under'Plan Review Comments'. ITT' H E A T RIDGE FIRE PROTECTION DISTRICT DOING THE R IGHT 3880 Upham Street Wheat Ridge, Colorado 80033 # ph.303.403.S900 * www.wrfire.org Final inspection and acceptance testing is based on field verification. It is the responsibility of the permit holder to ensure that all of the permit requirements are met. Failure to meet the requirements of the permit will result In a failure of the inspection. Re-inspections due to Inspection failure are subject to a charge of $50.00 per hour. REV 1212012 Plan Review Report WHEAT RIDGE FIRE PROTECTION DIS TRICT City of Wheat Ridge Residential Mechanic PERMIT - 071234 PERMIT NO: 0 JOB ADDRESS: 3 DESCRIPTION: R 234 80 AMES ST lace 2ton ro~f top A/C ISSU6D: EXPIRES: 11/13/2007 05/11/2008 ... CONTAC ... owner 303/9 4-4568 gc 303/4 2-1420 sub 720/9 4-2845 .. PARCEL INFO .. ZONE CODE: UA SUBDIVISION: 0462 .. FEE SUMMARY .. Permit 'Fee Total Valuati n Use Tax .. TOTAL .. JOHN W. WHEELER Mark Pohlenz The Church of Jesus Christ 01-8793 Wheeler's Plumbing Heating & C 01-8247 Alpha 6lectric, Inc. USE: UA BLOCK/LOT#: 0/ ESTIMATED PROJECT VALUATION: FEES 126.50 W : S:Z91 56:~~ JJ ~~~~ 183.20 3,150.00 Comments: I t the setback distances proposed by this permit application are accurate, and do not violate applicable regulations of tht City of Wheat Ridge or covenants, easements or restrictions of record; that all and allegations made are accurate; that I have read and agree to abide by all conditions printed on this I assume full responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other ge Ordi ances, for, work under this permit. PIa s subject to field inspection. /1 S' date 1. is permit was ssued in accordance with the provisions set forth in your application and is subject to the laws of the State of Colorad and to the Zoningi Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable ordinances of th City. 2. This permit shal expire 180 days f~om the issue date. Requests for an extension must be received prior to expiration date. An extens on may be granted at the discretion of the Building Official. 3. If this permit e ires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have bee or will be made i~ the original plans and specifications and any suspension or abandonment has not exceeded one \(1) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a ne permit. 4. No work of any nner shall be done that will change the natural flow of water causing a drainage problem. 5. Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written approval on inspection car~ before proceeding with successive phases of the job. 6. The issuance of permit or the approval of drawings and specifications shall not be construed to be a permit for, nor an approval f; violation of the provisions of the building codes or any other ordinance, law, rule or regulation. All pIa s subject to field inspections. ilding Official Signature ST LINK. (30,3) 234 -5933 BUILDING OFFICE: (303) 235-2855 E MADE BY 3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City of Wheat Ridge Building Division 7500 W 29th Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 . Fax: 303-235-2857 Inspection Line: 303-234-5933 Date: Plan#: Permit #: Building Permit Application Property Address 3 9-fu /J 1776'S 5/ Property Owner (please print): JAIL (~IJUp2C~ v~JjI Sv 5 Mailing Address: (if different than property addreSS}~tla) 5 T Phone :5 - 93<)- 'f5b~ Address j) e.A/ (~o. City. State. Zip: D)' I-J t.V6~ ntt t7/0dt<J (~o. ~V Po Box c/J'/96 Contractor: W,'J~ /J/lcc Contractor License #: Phone: .5 - 0:::2. - /!/z:v Sub Contracto s: A L!JN/i Electrical City License #: Company: ,? L 6C/~ Plumbing City License #: Company Mechanical City License #: Company: '0;,/ ;i:.,sl..- ,,c a :s. eN-a:::.!.- Exp. Date: Approval: Exp. Date: Exp. Date: Approval: Approval: Use of space (description): hfl'llf c.lZ 0<; . Description of work: /2oor;o;O II L Construction Value: $ 3)5(/ 00 (as calculated per the Building Valuation Data sheet) Plan Review (due at time of submittal): $ Sq, FUL.Ft added: Squares BTU's Gallons Amps OWNER/CONTRACTOR SIGNATURE OF UNOERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and thai I assume full responsibility for compliance with the Wheal Ridge Building Code (I.B.C) and all other applicable Wheal Ridge Ordinances, for work under this permit. Plans subject to field inspection. CIRLCE ONE. (OWNER) (CONTRACTOR) or PERSONAL REP PRINT NAME: _ \""~A.J l< l.WNi./t-I-.K, SIGNATURE. ENTA IVE of (OWNER) (CONTRATOR) J . atej) I)'?,!, 7 DEPARTMENT USE ONLY ZONING COMMENTS' Zoning: Reviewer: PUBLIC WORKS COMMENTS Reviewer BUILDING DEPARTMENT COMMENTS: OCCUPANCY Reviewer FIRE DEPARTMENT:: 0 approved wI comments 0 disapproved 0 no review required Bldg Valuation: $ ''"''c'"~'"''~_!lImIl!,,;~l~ll!lII, k.lr4l1l1l!l'l! '~~.~-.~,.,.\Ie,~''III'~~'-'"'e''''ljll!l!,"1,1I;L.I~~",....",,j..I'!I!'nll,_,II1!1, ~II .~ ll1,il~~",..,!;A,,11 ~'"' _I~. ",..r...JII '- ( City of Wheat Ridge Commercial Mechanica PERMIT - 070207 PERMIT NO: JOB ADDRESS: DESCRIPTION: 070207 3480 AMES ST WATER HEATER REPLACEMENT ISSU6D: EXPIRES: GALLON 65,000 BTU 03/19/2007 09/15/2007 50 ... CONTACTS ... 303/934-8203 303/757-5661 Larry D. Bell 01-7174 CHURCH OF J.C. L.D.S Bell Plumbing & Heating OWNER GC .. PARCEL INFO .. ZONE CODE: UA SUBDIVISION: UA USE: BLOCK/LOT#: UA 0/ Permit Fee Total Valuation Use Tax ** TOTAL ** ESTIMATED PROJECT VALUATION: FEES 54.37 .00 19.22 73.59 1,068.00 .. FEE SUMMARY.. ~1 Comments: SUBJECT TO FIELD INSPECTION I hereby certify that the setbackdistances.proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for work under this permit. Plans subject to field inspection. Signature of ,contractor/owner date 1. This permit was issued in accordance with the provisions set forth in your application and is subject to the laws of the State of Colorado and to the zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable ordinances of the City. 2. This permit shall expire 180 days from the issue date. Requests for an extension must be received prior to expiration date. An extension may be granted at the discretion of the Building Official. 3. If this permit expires, a new permit may be acquired for a fee of orte-half the amount normally required, provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes have been or if suspension or abandonment exceeds one (l) year, full fees shall be paid for a new permit. 4. No work of any manner shall be done that will change the natural flow of water causing a drainage problem. 5. Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card before proceeding with successive phases of the job. 6. The issuance of a permit or the approval of drawings and specifications shall not be construed to be a permit for, nor an approval of, any violation of the provisions of the building codes or any other ordinance, law, rule or regulation. All plan revi is subject t inspections. date INSPB tON REQUEST INB: (303)234-5933 BUILDING OFFICE: (303)235-2855 REQU6STS MUST BE MADE BY 3PM ANY BUSIN6SS DAY ~m~~O~N6SS Replacement bolIIrIIt,;; ,a~es - Minimum of BO"'. ~ 80IIersifumaces In IlIW construction. MnmIlm 01 g~ '1; .vue Setback Thermostat *IU1 ,,1 (Except for HydronlC HElIl) OIls Water Heatell. MIP,r''''m of .60 Energy Facto, E~ Water Heaters. Min" "um of .93 Energy Factor Insulation reaul~: _ R <' 1 Walll _ R-38 Ceilings · R-19 CrIIWI Speoea _ R 19 ~II./I..ltwal" DAY. COMMUNITY DEVELOPMENT DEPARTMENT BUILDING INSPECTlON LINE - 303-234-5933 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80033 . (303-235-2855) APPLICATION Property Owner: C':!?u,e-e.# oT ,/ .h~CL5 ~.v.L..z2:5 Property Address: .3-:/ FD ~7h'er;;;--;r' Phone,;j" 03 - ;?.JP"- .7.,;203 Contractor LIcense No.. !..%;7 /' _ Company:-& /; A E 11.4 Phone>>3'_ Y;::7 rid / Building Permit Number: Date: OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND Construction Value:S Permit Fee:S Plan Review Fee:S Use Tax:~ lotal:S /&6. "''' , . .:5'-'/ !l- _,,22 // - Ig-!2 I hereby certify that the setback distances proposed by this permit application are accurate. and do not violate applicable ordinances, rules or regulations of lhe City of Wheat Ridge or covenants. easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility fer compliance with the Wheat Ridge Building Code (U.B.C) and all other applicable Wheat Ridge Ordinances, f~r W~k un er thiS pe~ ;\.., ,..,....LJ-.h IOWNER)(CONTAACTORI'S1GNEO ~\),"-(jj .~. ~'v\",,\t./lii)\'{'DATE~ (OWNER )(CONTRACTCR ):PRINTED Description: ~/~d A"//~tZ' ;.:?;O/4(.;el#~i';-/ .:7~/ ~;?JcJc:J .2?ri/ Sq. Ft. added BU1LDIl'<G DEPART:\1E:'IT USE ONL Y SIC Sq.Ft.: SNING CCMMENTS: Approval: Zoning: BUILDING COMMENTS: Approvai: PUBLIC WORKS CCMMENTS: Approval: Occupancy: Walls: Roor Stories: Residential Units: Ii Expiration Date: Approval: Plumbing ~se N9: / 7/ -"':~ Mechanical License No: Company: Lfe// //7 ~ rr'"/Company: Expiration Date: Expiration Date: Approval: Approval: Electrical License No: Company: (1) This permit was issued in accordance with the provisions. sel forth in your application and is subject to the laws of the Stale of Colorado and to the Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable ordinances of the City. (2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (8) the building authorized is suspended or abandoned for a period at 120 days. (3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has nol exceeded one (1 ) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit (4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem. (5) Contractor shall notify the Building Inspector twenty.rour (24) hours in advance for all inspections and shall receive written approval on inspection card before proceeding with successive phases of the job. (6) The issuance ot a permit or the approval of drawings and specifications shall not be construed to be a permit for, nor an approval of, any violation of the provisions of the building codes or any other ordinance, law, rule or regulation. .3?7765 Chief Building Official DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number: BUILDING INSPECTION LINE - 303-234-5933 CITY OF WHEAT RIDGE Date: 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 - (303-235-2855) 12475 7/17/01 Property Owner: Property Address: 3480 AMES ST Contractor License No.: 17915 Company: C G Construction Phone: Phone: 421 6434 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value: Permit Fee: Plan Review Fee: Use Tax: I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and a ee to a ide by all conditions printed on this application, and that I assume full respon bil' for pliance with the Wheat Ridge Building Code (U.B.C.) and all other applicable Wh a idge r Inane ,for work under this permit. (OWNER)(CONTRACTOR) SIGNED DATE 1~I1'O L Total: Use: Description: REMOVE EXISTING SIDEWALK AND REPLACE WITH NEW. 695 sa FT BUILDING DEPARTMENT USE ONLY SIC: Sq. Fl. : Approval: Zoning: --- Approval: DM OK PER DM 7/17/01 Approval: Occu pancy : Walls: Roof: Stories: Residential Units: Electrical License No : Company: Plumbing License No : Company: Mechanical License No : Company: Expiration Date: Approval: Expiration Date: Approval: Expiration Date: Approval: $3,200.00 $97.25 $0.00 $48.00 $145.25 This permit was issued in accordance with the provisions set forth in yopur application and is SUbject to the laws of the State of Colorado and to the Zoning Regulations and Buildin9. Gode of Wheat Ridge, Colorado or any other applicable ordinances of the City. This permit shall expire If (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building authorized is suspended or abandoned for a period of 120 days. If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes are made or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit. No work of any manner shalt be done that will change the natural flow of water causing a drainage problem. Contractor shall notify the Building 'nsfector twenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card before proceediing with successive phases 0 the/.ob. The issuance of a permit r the approval 0 drawings and specifications shall not be construed to be a permit for, nor an approval of, any violation of the provisions of the b . I co soy other ordinance, law, rule or regulation. (1) (2) (3) m (6) Chi DEPARTMENT OF PLANNING AND DEVELOPMENT BUILDING INSPECTION LINE - 303-234-S933 CITY OF WHEAT RIDGE 7S00 WEST 29TH A VENUE WHEAT RIDGE, CO 8021S - (303-23S-28SS) APPLlCA nON Property Owner: LA-rrelL \::>A-ol ~A\'''+<' c).:..v....L.. &-\ Property Address: 34€:lO A-Me-;, 'S~. Contractor License No.: Company: Q -G:,. CO ,'-'S'1 Ie. <-/L." 'ON \ \ tV L Building Permit Number: Date. .)e.)v~ Ckl'l~+ Phone: Phone ":303 /.fz-'/-(O-{S'/ OWNER/CONTRACTOR SIGNATERE OF IT.'IDERSTANDING A.J.'ID AGREEME!\.'T I hearh)' certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances. rules or regulations of the City of Wheat Ridge or covenants, ea~ements or restrictions of rel;ord; that aU mea.surements shown, and allegations made are accurate; that I have read and agree to abide by aJl conditions printed on this applications and that I assume full rcsponsibility for complian\:e with the Wheat Ridge Building Cod.:: (L.B.C) and all other applicable Wheat Ridge Ordin c tor w k nder this permit. Construction Value: 3Z00~ Permit Fee: Plan Review Fee TT,,-p T~y' Total: (OWNERXCOl\ lRA.CTOR): SIGNED l' DATE! In/OJ Description: 'i<eM()f'€... \211.. f bee ~:> ":,,,. ele W''^ I Ie w\~ flew C<,..~ "Ct s 'Or: . BUILDING DEPARTMENT USE ONLY Zolrlng Conunents: Approval: Zoning: SIC Sq.Ft. . ',"'-"-'-,"',-,',-,'-,--,-,'-,'--'-'-'-""" BuildJngC<>inments: Approval: Public Works C<>mments: Approval: Occupancy: Walls: Roof: Stories: Residential Units: Electrical License No: Company: Plumbing License No: Company. Mechanical License No: Company: Expiration Date: Approval: Expiration Date: Approval: Expiration Date: Approval: (1) This permit was issued in accordance with the provisions set forth in vour application and is subject to the laws of the State of Color<ldo MId to the Zoning Regulations and Building Code of Wheat Ridge. Colorado or any other apphcablo:: ordinmco::s of tho:: City (2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (8) the building authorized is suspended or abandoned fora period ofl20 days (3) If this permit expires, a new permit may be acquired lor a fee of one-half the amount normally regulred, provided no changes have been or Will be made in tho:: onginal plans and specifications and any suspension or abandorunent has not exceeded one (I) year, If changes have been or if suspo::nsion or abandorunent o::xceeds one (I) year, full fees shall be paid lor a new pennit (4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem. (5) Contractor shall notify the BUIlding Inspector twenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card belore proceeding with successive phases of the Job (6) The issuance of a permit or the approval of drawings and speciJications shall not bt: construed to be a permit lor, nor an approval of. any violation of the provisions of the building codes or any other ordinance, law, rule or regulation Chief Building Inspector (ft> IAJIA 'k t ~,~ \ ..~.." . \ ". '\>: ~, 'to,"" I' q..~ "',r. -\-: ' C"it- 't' ec), ~ ~9 NOqI<'f!lV_~Nq_'iJ1VIfl.L /. . ---- #. ~~ ~86 ....A-Ma;..4 ......I...... ......~.... Project- f./"f.Vttbe.,.: J10~OI A Proje.ct- )J~e.: 2.00[ BUill;1/., Projec:t.s <4- 1'...-;" " .' , . :'JI.... . < " ...-~- '" '" ,S'LS i i! <:' ... "'. , , , ...;.. "" I I/D *. "'. , " :</' ; . , , . . )fl't'M \ .~ '. .. " "'0 <,. I i I . ~" /' ~~)I :~ /',11.1' '\t ~ . ~~ .. /' I;;ui /' c/)..! /~iI- ..- /~ /~ /~~ /~ A~ lC) . en ~~ .<41", ZO _ID 11." .'" 'to. "'d ~ ~7 . J]rawin~.# If 3 OfJ.. C DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number: 10182 BUILDING INSPECTION LINE - 303-234-5933 CITY OF WHEAT RIDGE Date: 3/1/00 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 - (303-235-2855) Property Owner: Property Address: 3480 AMES ST Contractor License No.: 17915 Company: C G Construction OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Phone: 719-634-3751 Phone: 421 6434 I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations 01 the City 01 Wheat Ridge or covenants. easements or restrictions of record; that all easurements shown, and allegations made are accurate; that I have read and a e to abide all conditions printed on this application, and that I assume full respon i. for nee ith the Wheat Ridge Building Code (U.B.C.) and all other applicable idge lor work under t~ rrr:.t:, (OWNER)(CONTRACTOR) SIGNED DATE~ Total: $80,000.00 $853.75 $554.94 $1,200.00 $2,608.69 Construction Value: Permit Fee: Plan Review Fee: Use Tax: Use: Description : Interior remodel of restrooms, classrooms. Exterior replacement of existing condensing unit BUILDING DEPARTMENT USE ONLY SIC: Sq. Ft.: Use prior to CUP requirement in code Okay Approval: Occupancy: Walls: Roof: Stories: Residential Units: Electrical License No: 18039 Company :Mark's Electric Expiration Date: 2/28/01 Approval: Plumbing License No : 17201 Company :Total Plumbing, Inc. Expiration Date : 8/31/00 Approval: Mechanical License No : 17935 Company: Action Air, Inc. Expiration Date: 11/7/1998 Approval : (4) (5) (6) This permit was issued in accordance with the provisions set forth in yopur application and is subject to the laws of the State of Colorado and to the Zoning Regulations and Buildin~ Code of Wheat Ridpe, Colorado or any other applicable ordinances of the City, This permit shall expire If (A) the work authonzed is not commenced within sixty (60) days from issue date or (8) the building authorized is suspended or abandoned for a period of 120 dal's. If this pennlt expires, a new pennlt may be acquired for a fee of one-half the amount nonnally required, provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes are made or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit. No work of any manner shall be done that will change the natural flow of water causing a drainage problem. Contractor, shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card before proceediing with successive phases of the,'ob. The issua of a pennit or the approval 0 drawings and specifications shall not be construed to be a pennit for, nor an approval of, any violation of the provisions of the b in m other ordinance, law, rule or regulation. (1) (2) (3) De ~29-99 02:l6P DEVREVFAX 303 235 2857 P.Ol :JEPARTMENT OF PLANNING AND DEVELOPMEI1T Building Permit Number: BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE Date: . 7500 WEST 29TH AVENUE (it f .' WHEAT ~IDGE, CO 80215 A PF l\ c.t.."T I D N '1/'7-& j<{- d?-.51 Property Owner: -rt~(. &""...a,.. or., Te~\l,~ &\"';~-t <lJ\ L~. "C~ s,a;r<<s Property Address:", .. AW\<.r.C::>\-..c.<.t Phone:.( .. _ ~ j" Contractor License No. : >. I..lYl\u-.o"",,, - ou:\ .\,,,, 'o"~. <",1'I~\i)'O~.'01"; \ Company:f. u.,.~","", . o.A -to Io~c\ Phone:, - OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREE MENT I hereby certify that the setback distances proposed by this permit appltcation are ace Irate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Rid e or covenants, easements or restrictions of record; that all measurements shown. and allt gations made are accurate: that I have read and il9.ree to abide by all conditions printed on thl I application. and that I assume full responsibility for compliance with the Wheat Ridge luilding Code (U.B.C.) and alt other applicable Whe Ridge ordinances. for work under this pt rmit. ~q()D _ = ;;7>5. .::J j"5<1. '14 Total: (OWNER)(CONTRACTOR) SIGNED )( . C . DA TE:t:J3_. 3::!.:jj Use: ~ch ow~.,.. 'R..c.p: "'f{,. ~ A...~OCA.~<.S.. 'P.... Description:f. I\I\+~'" ;0.- r.e,W"O '...\ (' t ..' \ . 0"" o~ <'..T"'OOvY\~, o35c;.rooW\'D. t::~~<.orIOr- r<,f'\~t.<.w\u'l eA e't..\...t;~ c..o~-GI'\&;'" ili-:+. BUILDING DEPARTMENT IISE ONLY Approval : Occupancy : Walls: RooI: S :ories: SIC: ~;c~~.: ?5: \ \" " f .~.. ,:>..' ' " A <\~ RECEIVED' JAN 0 l ?noo E.Q!1!I]SI~~mQll[,~~ \.J~e... ~I\.o~'\..oc..\,)~{'qvlr~l';;' CoAt- Approval: ""A II" I~ Zoning: R-~ Q/c. : J 1'., u'L~I.Jltl,.i.J.l1!,;Z: Approval : ~J/=.? ~\'iJ;.U~~ Electrical License No / ~{J :','1 CLr~ 'S cell cJ- Expiration Date : Approval : , Plumbing License No : amc an : (7 i/ 35" ( L'V\. O.A--L Expiration Date : Approval : Expiration Date: Approval: (1) This permit was issued in ac=n:lance with the provisions sel 10nh in YOpYr application anc .. aubjed to the Iawa at the State of COlorado and to the ~onlOg RegulatiOns and Buildi"9. Code of VVheIlt Ridge. Colorado or any other ~p1ica1)le ol'dlnan '" of the City (2) This permit shall ~ if (A) the work autI"lOnzed I' not commenced witmn sixty (60) days !rom issue dele 01' (8) the building authonzed tS suspended or abanaoned, tor aper10d of 120 days, (3) If this permit expns. a new pemwt mlY be KQUlred for a fee of one-half the amount norm Illy n:quired. provided no Changes have been or will be made in the ongmal plllns and speciticatlonl and any IUIJIel'lI6on or lbanoonment has not exceeded ( 1e (1) y.ar. It Changes are made or If sU5penslon ar abMldonmenl exceed. one (1) year, full tea ISh" be ~ for. new permit. {.4) No work 01 any manner shall be done thII will cnange the rtatural ftow afwatel calJsillliJ a ' l"iIinage problem. (5) Contractor ,I\all notify the Building Inspector twenty.fout (2-4) hours In advance for ell 11"1$1) cbonS and ,hall receive written apprcval on inspec:tiOr'l C8fd before C)(OCee(liing with sua:astve pna.s of the job. (6) The islUMCe of a permit or the IPJlRW81 at drawingl and IC)eCiflcatians wll not be com.! Jed to be a permit for. nor an approval af, any vicUlbon of the provision. of trle bUilding codes et ordinance, law, rull or regulation. Chief Buil i:C(~ 11: 08 7196343791 BRYAN KEYS AND ASSOC PAGE 01/02 ~~Jf!!~~ F A C S M L E To: 'D.car";~ ~~ C&J.,u., .AJy.,.L~'~~ FROM: ~~ ~~~ PROJECT: \...It'~ C..r.. Ii ~~ AM.u, ~ ~ 6Y;)- PAGES: .~ ,INCLUDINGTHISCOVERSHEET. 2-/2$Jve DATE: .z . I ~ .t90 COMMENTS: \ r- . , \-r~ I', '%. ~"r' 11..~~(....J ~\~f\v~ +~ LCM....b"tf.-t-o!!Pr o.AJ.rli'l~ ~d'Ul\. 1'''4~ I'9'U~~ \IHr ~~ t.e:.:, .~tJ. ff r- '-'6Ve. ~ t'~\""' 1'D.""lLU.h u.f \APt.. ~~ . \ ,. l ~~ (/0', ~a, G.w.~~ I ~~ -fu,t(L~&!'r- 417 S. Cascade, Coiorodo Springs, Colorado 80903 Voice: (719)634-3751 Fax: (719)634-379 I _.IW.ll-~'".~;.l;.It. J 7t~i7!l+ BRVAN KEVS AND ASSOC PAGE 01/01 'ates & PLANNING FEBRUARY EIGHTEEN 2000 Bill Goodman CoG Construction 4915 Iris Street Wheat Ridge, Colorado 80033 RE: Denver 2" Ward Golden Colorado Stake Project No. 503-2644 Bill: Please incorporate the following changes into the project: 1. Rostrum plan 6/A-2 - Add another row of joist support blocking to the slab as shown in attached Partial Plan dated February 1 B, 2000. 2. Backstop detail 2/A-1 - Verify support connection of existing 2 3/8" diameter pipe to structure. Keys & Associates will then preparejetail for building department review. Note: Anchors for wood buck at wall shall be(.2)'4" X 3" lag bolts at 32' o,c. into studs. 3. Toilet Room 135 - Replace the water closet with a new water closet 4. Men's Room 205 - Delete the twO wall hung sinks in Addendum 2. Add counter top as shown on 4/A-2 and one counter top lavatory at east end. 5. Change CU-1 from a 15 ton unit to a 10 ton unit. Disconnect the refrigerant piping to the existing unused 5 ton fan coil so piping serves active 10 ton fan coil only. Please provide cost breakdowns for any of the above items requiring a cost change. If you have any questions, please give me a call. Sincerely, cc: Scott Hollister Duane Johnson 411 South Cascade' Colorado Springs' Colorado 80903' 119/634-3751 . Fax; 719/634.3791 02/~nlm-'~' 71~53437~1 .lan-31-00 .11;51A DEVREVFAX BRYAN KEYS AND ASSOC 303 235 zel'F PAGE 02/02 P.oz Code Ct)rrection ~ JanUl ry 5, 2000 OWner: LOS Church Builder: 117717 Address: 3480 Ames Street Description: Commercial interior "Iterati.,ns 1. Stage framing of 2x6x16" O.c. does not appear to meet 125 psf floor load requirements required by UBe table 16-A. . 1P".2 2. Provide adetail showing how 2-3/8" existilQ pipe supporting the new goals are attached to ~heexisting structure. 3. Provide wood buck anchor size and spacin! information. - 'tA.( Please make these additions or corrections to the 5 Ibmittal and resubmit for review, if you have any questions or comments please feel free 1 J contact me at 235-2853. Sincerely, 6Jm~. Darin M4 Codes Administrator ~2/23/2~~~ 14:39 7196343791 BRYAN KEYS AND ASSOC RAGE ~1/~3 ~~~Jf1!~~ F A c s M L E FROM: 1:)~~'1 '" t--J\d~~ ~.(..., .AJ '^" I..~'~ ~e>V" _~~~A ~ To: PROJECT PAGES: 'P1 , INCLUDING THIS COVEI\SHEET DATE: "Z . I ~ .~O COMMENTS: \..r~ \', 'Z. ~f a.-t-b:ttc.. I..! ~\~-ii~~ +~ ~OI.\. --b n ,.-t- "'~ a.M ~ ~ d't.Ul. I' ~4~ tAt A.U ~ \IMr r.111.-rr4 l'?'~~, [c.f' r "'...,,~ ~ ,,~~ 1'a.v.J1I..u~ LL-r~. ~l') . 1 * , ~3 C--~', ~~ ~~~ I ~~ -+r~"v.+ef'" 417 S. Cascade. Colorado Springs. Colorado 80903 Voice: r 19)634-3751 Fax: (719)634-3791 02/23/2000 14:39 7196343791 BRYAN KEYS AND ASSOC PAGE 03/03 ~~flt~N~ FEBRUARY EIGHTEEN 2000 Bill Goodman CoG ConstruClion 4915 Iris Street Wheat Ridge, Colorado 80033 RE: Denver 2"' Ward Golden Colorado Stake Project No. 503-2644 Bill: Please Incorporate the following changes inw the project: 1. Rostrum plan 6/A-2 - Add another row of joist support blocking to the slab as shown in attached Partial Plan dated February 15,2000. 2. Backstop detail 2/A-l - Verify support connection of existing 23/8" diameter p'pe to structure. Keys & Associates will then prepare petail for building department review. Note: Anchors for wood buck at wall shall be(2)\!." X 3" lag bolts at 32" o.c. into studs. 3. Toilet Room 135 - Replace the water closet with a new water closet. 4. Men's Room 205 - Delete the two wall hung sinks in Addendum 2. Add counter tOp as shown on 4/A.2 and one counter top lavatory at east end. 5. Change CU-, from a 15 ton unit to a 10 ton unit. Disconnect the refrigerant piping to the existing unused 5 ton fan coil 50 piping serves active 10 ton fan coil only. Please provide COSI breakdowns for any of the above items requiring a cost change. If you have any questions, please give me a call. Sincerely, Bryan Key cc: Scott Hollister Duane Johnson 417 South C.scade. Colorado Spring5' Colorado 80903 . 719/634-375! . Fax, 719/634-3791 WHEAT RIDGE FIRE DISTRICT "Dedicated To Serve Through Excellence" P. 0 Box 507 . 3880 Upham St. . Wheat Ridge, CO 80034 . 303-424-7323 . Fox 303-940-0350 2.(JcJO January3,~ To: Darin Morgan Codes Administrator City of Wheat Ridge Wheat Ridge, Co. 80033 Subject: Plan Review for Denver Second Ward, Church of Jesus Christ of the Latter Day Saints, 3480 Ames St., Wheat Ridge, Co. Dear Darin, After a review of the proposed plans for the interior remodel of the LDS Church at 3480 Ames Street, Wheat Ridge, Co., I am requiring the following items concerning this project: 1. Provide complete plans and cut sheets for fire alarm system if there is any area that needs revision as a result of the remodel. All spaces must remain detected throughout. 2. Issues and or items not addressed will be addressed as the need arises. Should the developer/contractor have any questions regarding the above requirements, they can contact the Fire Marshal Office at 303-403-5902, to set an appointment to discuss the issues. CS:::fullY, I ~ Dave Roberts F.M., W.R.F.P.D. cc:file -'-~' 'NHf-4l' 1>/ "- 0 - Cl U '" C'O(ORf>.';:'o Code Correction List January 5, 2000 Owner: LDS Church /o~ ---~ Builder: ?????? Address: 3480 Ames Street Description: Commercial interior alterations 1. Stage framing of 2x6x16" o.c. does not appear to meet 125 psf floor load requirements required by UBC table 16-A. 2. Provide a detail showing how 2-3/8" existing pipe supporting the new goals are attached to the existing structure. 3. Provide wood buck anchor size and spacing information. Please make these additions or corrections to the submittal and resubmit for review, if you have any questions or comments please feel free to contact me at 235-2853. Sincerely, ct2 ~O-. Darin M~ Codes Administrator ~~lflt~~ DECEMBER TWENTY-NINE 1999 Kim Quayle Department of Planning and Development Building Inspection Division City of Wheat Ridge 7500 West 29th Avenue Wheat Ridge, Colo. 80215 RE: Denver Second Ward Church of Jesus Christ of the Latter-Day Saints 3840 Ames Street Kim Quayle: Per our conversation earlier today please accept this enclosed submittal for Building Permit review. Basically it is a interior remodel of restroom fixtures, dividing one classroom into two with a partition wall, installing two basketball backstops, exterior signage, and replacing an existing condensing unit. I have also contacted the Fire Department and I am sending the required drawings to Dave Roberts for his review. Enclosed are the following: 3 Complete sets of documents Stamped and Signed 2 Sets of specifications 1 Permit application If there is any questions or further information required please give me a call, or e-mail at 'dweiss@bkeys.com'. Thank you. Sincerely, BRYAN KEYS & ASSOCIATES, p.c. ~ C. vJe'---~ Darin C. Weiss 417 South Cascade. Colorado Springs. Colorado 80903. 7191634-3751 . Fax: 719/634-3791 TEMPORARY Certificate of Completion AND / OR . Compliance pending completion of fire alarm system Expires:Ma~15, 1999 - / CITY OF WHEAT RlDGE t::- xreNdED ill APf,!,IL. .30} I 7500 W. 29TH AVENUE WHEA T RIDGE, COLORADO 80034 THIS CERTIFICATE VERlFIES THAT THE PROPERTY DESCRIBED BELOW, DOES COMPL Y WITH THE WHEAT RlDGE BUILDING CODE, ZONING AND OTHER RELATED LAND USE AND DEVELOPMENT LA WS OF THE CITY OF WHEA T RlDGE FOR THE FOLLOWING PURPOSE: INTERIOR REMODEL, ENCLOSE ENTRY INTO VESTIBLE, SITE FENCING CHURCH OF JESUS CHRIST OWNER OF LATTER DAY SAINTS ADDRESS 3480 AMES STREET CONTRACTOR CONNER CONSTRUCTION CO. PROPERTY ADDRESS 3480 AMES STREET DATE 1112/99 CHIEF BUILDING OffICIAL .tJ~ ZONING ADMINISTRATOR #717'~ 3-3{)--<f9 #t14~ Certificate of Completion AND/OR Compliance \ CITY OF WHEAT RIDGE 7500 W. 29TH AVENUE WHEAT RIDGE, COLORADO 80215 THIS CERTIFICATE VERIFIES THAT THE PROPERTY DESCRIBED BELOW, DOES COMPLY WITH THE WHEAT RIDGE BUILDING CODE, ZONING AND OTHER RELATED LAND USE AND DEVELOPMENT LAWS OF THE CITY OF WHEAT RIDGE FOR THE FOLLOWING PURPOSE: INTERIOR REMODEL, ENCLOSE ENTRY INTO VESTIBLE, SITE FENCING OWNER: Church of Jesus Christ of Latter Dav Saints ADDRESS: 3480 Ames Street CONTRACTOR: Conner Construction PROPERTY ADDRESS: 3480 Ames Street ZONING ADMINISTRATOR DATE tj-.30- 99 CHIEF BUILDING OFFICIAL o SPRINKLER SYSTEM PRESSURE TEST tJ FIRE MAIN PRESSURE TEST o HOOD & DUCT SUPPRESSION SYSTEM TEST .. FIRE ALARM SYSTEM ACCEPTANCE TEST [J OTHER LOCATION: \....~':l c..~..L - "3"'~O A_s S\, DATE: \-\-'2.'\- \ "I REQUESTED BY: .....~~~.S~...... CONDUCTED BY: ~~ t..4L- ~b.t,:h SYSTEM PASSED)ii( FAILED D COMMENTS~\_&~~i:'..o ",aT Q ~~.n.o ~. .Q:~ J.t.t< h_h- SIGNED~.",.~,.h ..ftk_w~PP() ~nner onstruction ompany 2670 S. Delaware Denver, CO 80223 303 744-1096 Fax 303744-1005 Monday, March 29, 1999 Mr. Darin Morgan; Chief Building Inspector Department of Planning and Development Building Inspection Division City Of Wheatridge 7500 West 29th Avenue Wheatridge, Colorado 80034 REF CHURCH OF JESUS CHRIST OF LATTER DAY SAINTS 3480 Ames Street Wheatridge, Colorado Dear Mr. Morgan, Conner Construction Company hereby requests an extension on the Temporary Certificate of Completion and/or Compliance at the above referenced project. As I am sure you are aware, we have been working diligently on the completion of the fire alarm system and have encountered various obstacles i.e. ground fault in the system; bad detectors, etc. that has become beyond our control. We are hereby requesting a six- (6) week extension so that we can complete the fire system to code and per the Fire Marshall's recommendations. I have attached a copy of the temporary certificate and note that should we complete this work before the added extension time, I will notify your office in writing immediately for a final certificate. Should you have any questions or comments, please do not hesitate to contact Rick Mayre, Project Superintendent at 303.598.3044. Respectfully submitted; Con er Construction Company Beth Champion Office Manager Commercial Division C: Todd Winslow; Project Manager Rick Mayre; Project Superintendent File Total client satisfaction is ollr goalt The City of 7500 WEST 29TH AVENUE GWheat <Ridge . WHEAT RIDGE, COLORADO 80215 January 4, 1999 To whom it may concern; This letter is verification of the replacement of interior doors at the Church of Latter Day Saints, 3480 Ames Street. This response confirms that the placement ofthe new doors comply with exiting requirements of the Code of the City of Wheat Ridge Building Department. Respectfully, &6 Bob Gaspar, ~ Building Inspector City of Wheat Ridge BG/kq (303) 234-5900 . ADMINISTRATION FAX: 234-5924 . POLICE DEPARTMENT FAX: 235-2949 FROM HRNS KRHN R550C. PHONE NO. 759 9886 5ep. 23 1998 01:37PM Pi FAX TRANSMITTAL ,t ... ~(1I ~() ~/ ~r8\,1i HANS KAHN ASSOCIATES, INC., ARCHITECTS 2140 SOUTH IVANHOE STREET, SUITE 206. DENVER, COLOR..u>o R0222 (303) 7S9-93) 1 TO: FIRM: DATE: September 22,1998 Conner Construction Co. ATTENTION: Todd Winslow NUMBER OF PAGES, INCLUDING THIS ONE: 1 HKA PROJECT #: Denver 2nd Ward Remodel .3'" f6 A ",C"s LOr CA~ REGARDING: S~e Wall Detail. Dwg. AX3 Revise 3/8" weeps to read: %" PVC weeps at 32" o.c., cover openings at east side (intake) with geofilter fabric. FROM: Brice Mercord TRANSMIT TO FAX NUMBER: (303) 744-2251 ec: Darin Morgan, Wheat Ridge Building Department Scott Hollister, LOS . .. '''''';' .. " .... ',.' , "". ", . "~" .,>. ,,' .... ."- , .' ... .~RTi1f6 OF PI..ANNlNGANDoMir '. NT BUILOING INSPECTION DIVISION - 235-" . . . CITY QF WHEAT IJIDGE . 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 ;'".,:',,/' :\0....:.":',./.......,..',...'...'.,"..,.. ';'C",';.':":',\.-.':',"':"':"'" y,~.,._,.-,-:..!..,' .,.,:,~'.i'.,,<.:.,;~.t .;,':."><....,;.. '. Building Permit Number: 1497 Date : 7/23/98 ,'f 'p~ oWner: Pi'operty Address: 3480 Ames Street Corllractllr Llc$nse No.: 17187 . .:, Company: Conner Construction Co. OWNEAA:6N'rAACr~,stGNAT1JRE OF UNDERSTANDING AND AGRIl:EMENT t', "J Phone: 495-3944 PhQne: 744-1096 . Constti:1cIion ValUe : Permit Fee : Plan Review Fee : Use Tax : Total : $368,000.00 $2,235.00 $0.00 $5,520.00 $7,755.00 U$e: Descriplion : model. enclose entry into vestible, site fencing BUILDINGDEPARTMcNT USE ONLY SIC: Sq. Ft.: Remodel, enclOsure ahd. fence COIl1PIy WIth pennlts plans iltampedaPPtoved on 31%7198 "Approvef: Occupancy : Walls: R.opf: Stories: Residential Units : .. .. .." .... " .. ::' ~- EIectrieaI LicenlMt NO : Company : Plumbing License No : Company: Mecl1anlcal Llc$nse No : Company: expiration Date: Approval: Expiration Date : Approval: ExpiratiQnDate : Approval: (1) (2) '(3) ~ (6) r DEPARTMENT OF PLANNING AND DEVELOPMENT BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Building Permit Number: Date: Property Owner: Property Address: Contractor License No. : Company: OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT W 0 \ \ i . - +< f-- t pp. ?/q-4qj- 3C}44 Phone: I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions . ted on this application, and that I assume full responsibility for compliance with the h at Ridge Building Code (U.B.C.) and all other applicable eat R.idge Ordi.~ances, for wo u der t~pe it. (OWNER)(CONTRACTQR) SIGNED e. C~/"'L DATE-'/, !3n/u /fLUe a '75Q- '13/1 Description: l~t1?~ P-i?'-vto~)._ ~ct;t;Jt_ lrJ'1&'1: etVtV VFt-6il . c (3- BUILDING DEPARTMENT USE ONLY Construction Value: Permit Fee: Use Tax: 3tR d; (XJO ,;;),:235 5. :5~ I Total: $0.00 Use: c/Vh-~i+ ~iml~tl:Itt\)mG '!l/~/'i 'P ~ ~_ :# _r"! ~~Ij-'- R-3 ~.w' 1~cM.~ a..J b~ ~ ~ ~..,. SIC: Sq. Ft.: NA- Approval: Zoning: <l!J ' 1l.'/\!i1!lul".l:.h1.\)- Approval: ;{!, l::" . !':'0\"-'lulHf;.tilb- Approval: Occupancy: Walls: Roof: Stories: Residential Units: Electrical License No : Company: Plumbing License No : Company: Mechanical License No : Company: Expiration Date: Approval: Expiration Date: Approval : Expiration Date : Approval: l;l (6) This permit was issued in accordance with the provisions set forth In yopur application and is subject to the laws of the State of Colorado and to the Zoning Regulations and BulldinR Code of Wheat Ridge, Colorado or any other applicable ordinances of the City. This permit shall expire If (A) the work authorized Is not commenced within sixty (60) days from Issue date or (B) the building authorized is suspended or abandoned for a period of 120 da)'s, . If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes are made or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit No work of any manner shall be done that will change the natural flow of water causing a drainage problem. Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all Inspections and shall receive written approval on Inspection card before proceedilng with successive phases or the/lOb. The Issuance of a pennit or the approval 0 drawings and specifications shall not be construed to be a permit for, nor an approval of, any violation of the provisions of the building codes or any other ordinance, law, rule or regulation. (1) (2) (3) Chief Building Inspector For Mayor THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION '" HANS KAHN ASSOCIATES, INC., ARCHITECTS 2140 SOUIlI IVANHOE STREET, SUITE 206, DENVER, COLORADO 80222 (303) 759-9311 September 17, 1998 Mr. Darin Morgan Building Official City of Wheat Ridge 7500 West 29th Avenue Wheal Ridge, CO 80215 ) ,.,>, I " ,- -"11 . .t. RE: Denver 2'4 Ward Remodel Church of Jesus Christ of Latter Day Saints _ ~" 'lr' . J.t i Wheat Ridge, Colorado Dear Mr. Morgan: Attached are two copies of revised site wall detail (drawing AX3) stamped by the project structural engmeer. The Owner is obtaining approvals from adjacent property owners and will have those to you very shortly. c~SJ Brice Mercord BM/kf Enclosures cc: Scott Hollister 1DP OF cl-1U .. MIt-J,p42'/ A . AT NeiGH , . _~~==--s..ln WA\..L...DE.TAIL _~::::":'h....t.$VISI.c?t-,L W S"/~p~ ,. I ! "."..... .",,\ P A It.... ..~~...(~rtf~t~,. ......--. ... '" ..~ .....'1 . .. .0 · ..! 1 ,Uf . . . .*. .. ..' . . .' ...'S)C:> I ,.;'" #;1:1.\' .' .....". CO\."f" ..... SEP 141998-- P!:t-J\l1:;=1'{ '2.NI? WAJ<!'? DATil 4: B DW~. NO. HANS KAHN ASSOC. - ARCHITECTS ORlG. DWG. REF. A X 3 2140 S.IVANHOE ST., SUITE 206 ? /~j:7~ . DENVER. CO 80222 /- ~ /i'. lOP OF CI-1U w. L-L. MUST -ae Mlt-J.p4'2 II A t=. ~oe . AT NeiGH ~l=<ope~""", ... . ~,t\... , ~~-.~=-S\n: WA\-LDE.TA~L _~=~.___1~:~VI~I~N:"tV 5'/c:;;p~ P~t-Jvt::=!'{ -:z.N" WAJ<.l? OATH 'I 4: e> DW9. NO. HANS KAHN ASSOC. - ARCHITECTS ORlG. DWG. REF. A X -::l 2140 S. IVANHOE ST., SUITE 206 ? 0 j:7'? ;.; DENVER, CO 80222 r The City of 7500 WEST 29TH AVENUE . WHEAT RIDGE, COLORADO 80215 GWheat 'Ridge September 21, 1998 Conner Construction, Co. c/o Todd Winslow 2670 South Delaware Denver, CO 80223 RE: LDS Church. 3480 Ames St.. Wheat Ridl!e. Colorado Dear Mr. Winslow, Your proj ect superintendent requested that I send you this letter stating my opinion regarding what should have been done prior to excavating for the new retaining wall at the above referenced address. It is my opinion from looking at the existing retaining wall, an evaluation of the structural stability of the existing wall should have been done prior to any excavation. It is obvious from the visual condition of the existing wall that there should have been some structural concern regarding the leaning of the wall and cracks in the wall Due to this wall not being part of the above referenced address, it should have been even more of a concern since the church will more than likely be held liable for any future damage to adjacent properties that may occur related to the retaining wall or drainage. Should you have any questions or comments regarding this issue please feel free to contact me at 235-2853. Sincerely, #7/1 DarinMOrga~ Codes Administrator cc address file Alan White, Planning and Development Director Bob Gaspar, Comb. Building Inspector Greg Knudson, Development Review Engineer (303) 234-5900 . ADMINISTRATION FAX: 234-5924 . POLICE DEPARTMENT FAX; 235-2949 BUILDING DEPARTMENT (303) 235-2855 CITY OF WHEAT RIDGE * * Correction Notice Job Located at ~Lj fO #m e >- I have this day inspected this structure and these premises and have found the following violations of City and/or State laws gov- erning same: !) (:YJ!;;:I ~'~/7~ f!:t~!; ON~ : 5:~:/O: 'f~"ry-? ia,)~n~ rdC<JJ:; :::;;+J-, -z 'y?rn'f /,,' . I, c7 C'/J." ' e <-7 );..t2 :5 J ~o jj ,Coo!11 : IN 1/ ocid ~/e II (; 96 7 1/11.!-/1 ..f/'/'uc#)'vn ~ ru"lv~J - ) /2 IlK/. (70/ cJf);o-r aJ ::l..;J~- ~ .03 rJ: you II'J('('-C~ 'f1~C//1~ "You are here"Y notified to correct the foregoing violations. When corrections have been made, call for inspection. Dr,',") ;JJ;'7a<,/ Date 7-:]-76 JZ,~<L- Ins r for Building Dept. DO NOT REMOVE THIS TAG FORM WR6.22 ,;". 'h ":1"~'.ol.i.~:;;V , ",.,!,.#!At~/~Y'r'iY." ' ;;,<.;'ti~-:::; <:/'f -::';;:'t'>f,'f(),:' ,<"'" "'<" t\/. ',' ~- >,,, DEPARTMENT OF PLANNING AND DEVELOPMENT BUILOING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Building Permit Number: Date: Property Owner: Property Address :3"T!O A-MGS Contractor License No.: ;)t:JO 70 . Company: Cd ,J I (/ t:.- OWNER/CONTRACTOR SIGNATURE 0 UNDERSTANDING AND AGREEMENT Phone: \ Phone: 789-Z?oro Construction Value: Permit Fee: Use Tax: Total: $0.00 Use: Description: BUILDING DEPARTMENT USE ONLY ~q:n[.omm!l1.l~--2 Approval : Zoning: J;lJ!]1t'1!!~omme~t!i.i1 Approval: ~~.Otf(SI,(tQ.lIJ!I!~n~ Approval: Occupancy: Walls: SIC: Sq.Fl: Roof: Stories: Residential Units: Electrical License No : Company: Plumbing License No : Company: Mechanical License No : Company: Expiration Date: Approval: Expiration Date: Approval: Expiration Date: Approval: (4) (S) This permit was Issued In accordance wtth the provisions set forth in yopur application and Is subjed. to the Iaw$ of the Slate of Colorado and to the Zoning Regulations and BuiJdi"9. Code of Wheat Rickie. Colorado or any other applicable ordinances of the City. This permit shaD expire ., (A) the wort authorfzed Is not commenced within sixty (60) days from Issue date or (B) the building authoriZed Is suspended or abandoned fO( a pel10d of 120 dars. . If this permit expires. a new permit may be acquired for a fee of one.hatf the amount nonnally required. provided no changes have been or wilt be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes are made or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit No work of any manner shall be done that will change the natural now of water causing a drainage problem. Contractor shall notify the Building Inspector twenty.four (2'1) hours in advance for all inspections and shall receive written approval on inspection card before' proeeediing with successive phases of the job. The issuance of a permit or the approval o( drawings and specifications shall not be construed to be a permit fO(, nor an approval of. any violation of the provisions of the building codeS or any other ordinance, taw, rule or regulation. (I) (2) (3) -, '(6) Chief Building Inspector For Mayor THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION INSPECTIONS WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE BUILDING SITE 24 HOURS NOTICE REQUIRED FOR INSPECTIONS WHEAT RIDGE, COLORADO 7500 WEST 29th AVENUE (303) 234-5933 INSPECTION RECORD ","",.., 31./ ~ ,4", I'!~ ~ BUILDING PERMIT NO. ~~ DATE ISSUED ~.a..IIe\ TYPE I OWNER CONTRACTOR :' on n 'l ~ c,tJ(\ ~ ~'\Ac. ~~ nn. (In, SETBACKS FROM PROPERTY LINES: NORTH SOUTH EAST OCCUPANCY I WEST INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS Joe INSPECTION DATE INSPECTOR Footings Caissons Reinforcing or Monolithic sial t/',k Weatherproofing 6 POUR No CONCRETE UNTIL ABOVE HAS BEEN SIGNED Concrete Slab Floor: Electrical (Ground Work) Plumbing (Ground Work) Heating (Ground Work) Do NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED Rough Electrical OK 31 I" Rough Plumbing Air Test Gas Piping Rough Heating & Ventilation (above must be signed prior to framing inspection) Framing f/,. .j~fi.;J.,J/ {1/'&;!" Insulation 11-/1 'd OX-.. dG~^k-"V;",,-IL11r'c,'8 ? Drywall nailing Roofing Refrigeration Electrical underground Electrical Plumbin Heatin & Ventilation Frame R.OW. & Drainage Fire Department Parking & Landscaping JZ. jJ,' "'" " ~a ~ OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF OCCUPANCY IS ISSUED PROTECT THIS CARD FROM THE WEATHER WHEAT RIDGE FIRE DISTRICT "Dedicated To Serve Through Excellence" P. 0 Box 507 . 3880 Upham 51. . wheat Ridge, CO 80034 . 303-424-7323 . Fax 303-940-0350 ~ ~~ March 16, 1998 To: John Eckert Chief Building Official City of Wheat Ridge Wheat Ridge, Co. Subject: Remodel of Denver Second Ward of the Church of Jesus Christ of Latter Day Saints, 3480 Ames Street, Wheat Ridge, Co. Dear John, After a review of the proposed remodel of the LDS Church located at 3480 Ames Street, I am submitting the following requirements concerning this project: 1. Fire alarm plans need to be submitted and approved prior to installation. 2. The church clergy will need to submit a letter regarding the amount of time and type of use the kitchen is used for. The two electric stoves that sit side by side are in the process of being replaced with 2 new units. Two fire extinguishers will be needed for the kitchen, one five pound ABC extinguisher, and one 20BC rated extinguisher. Depending on the amount and type of use regarding the kitchen, a hood and duct system may need to be installed. This item will depend on the church usage of the kitchen. 3. Items or issues not addressed at this time will be addressed as the need arises. Should there be any questions or concerns, the developer/contractor can contact me at 424-7323 to set an appointment for discussion. ';j;C'ZIz ave Roberts Fire Marshal Wheat Ridge Fire Protection District HANS KAHN ASSOCIATES. INC. Architects P .C. 2140 S. Ivanhoe St. Ste. 206 DENVER, COLORADO 80222-5750 [1,rnuurn~ @[? u~&[}!]~lli\JDuu&[1, Tel (303) 759.9311 Fax (303) 759.9886 TOvJ~ Jzll/~ bwb. VlZPt D Shop drawings o Copy of letter D Prints o Plans o Samples the following items: o Specifications WE ARE SENDING YOU > o Attached o Under separate cover via o Change order o COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: o For approval o For your use o As requested D Approved as submitted o Approved as noted D Resubmit __copies for approval CJ Submit copies for distribution o Returned for corrections D Return corrected prints > D For review and comment 0 o FOR BIDS DUE 19 o PRINTS RETURNED AFTER LOAN TO US REMARKS SIGNED: COpy TO If enclosures are not as noted, kindly notify us at once. SEP-04-98 11:24 AM RKY MTH HRTLD PROD 303 841 8208 P.02 September 4. 1998 DARIN MORGAN Code Administrator Wheat ridge Building Capt. 7500 W. 29th Ave. Wheat ridge. CO 80215 DEAR MR. MORGAN. THIS NOTE IS IN REFERENCE TO THE WALL THE LOS CHURCH IS BUILDING AT. AMES BORDERING MY PROPERTY AT 3405 - 3417 SHERIDAN. EnClosectrs~~~tter to SCOTT HOLLlSTER,Physical Facilities Manager for the LDS Church. Per our conversation this morning with I understand that you have ordered all work stopped on this project until all the parties have come to an agreement as to how to proceed. You also recommended that my wall be replaced As you can see in my letter to Mr. Hollister, I do not want any further work done effecting my property until we have in deed come to an agreement in writing. Also, I must be included in any further meetings effecting my property. THANK YOU FOR KEEPING ME INFORMED. I would appreciate it if you Would put some of these conversations in writing to me in the form of a letter. Mr. Hollister has assured me of a meeting sometime TUesday, Sept. 8. I'd like to request your attendance. SINCEREL Y. --'S-{~4~ STEVE DYER Landlord 303- 84 1 -8208 P.O. Box 937 Parker, CO 80134 SEP-04-98 11:25 AM RKY MTN HRTLD PROD :383 841 8208 P.03 September 4, 1998 SCOTT HOLLISTER Physical FacUilies Managor LOS Church 7275 Swan Rd. Colorado Springs, CO 80908 DEAR MR. HOLLISTER. 3~ '0 THIS NOTE IS IN REFERENCE TO THE WALL YOUR CHURCH IS BUILDING ATjJt16 AMES BORDERING MY PROPER TY AT 3405 - 3417 SHERIDAN. As you know, during construc\ion of your wall the excavation process has weakened my wall to the extenlthat II is railing over. Darin Morgan at Wheat ridge Building Oepl. has advised me this morning that he has shut down all work unlil a resolution has been structured with me. To address a tew Issues; 1) Rick Mayre and Todd Winslow with Conner Construction told me that someone from your organization had spoke with adjoining property owners prior to this project starting. AT NO TIME HAS ANYONE CONTACTED ME. I found out aboutlhis job when I was 1Il my property in mid August. 2) Per my conversalion with you this moming no furthor work is to take placo on my wall until we have a meeting (nexl Tuesday) and agree 10 terms as to what Is 10 take place in writing. 3) Things we neod 10 address are replacement of my wall, its construction, drainage, warranlioS, financial responsibilities to ~ lotally assumed by your organization. and correction 01 any other probloms croated by Ihis silualion. 4) Any meetings effecting my property so lar have taken place at my exclusion. From here on I need to be included in such meetings for my approval of anything effecting my property and receive communication and documentation of any procedures. I've S9I\t correspondenco regarding this mailer to Todd Winslow, Rick Mayre at Conner as well as Darin Morgan at the Building Oopt. I'd appreciate your contacling me as soon as possible to confirm a time and place for our meeting nexl Tuesday, Sept 8 1996. THANK YOU FOR YOUR PROMPT A Tl ENTION TO THESE MA lTERS. SJN:~'. ~ L/-J)7..l...-. STeVE DYEn Landlord 303'641-8208 P.O. Box 937 Parker, CO 80134 cc Todd Winslow Rick Mayre Darin Morgan David Braden, PC SD PERMIT TRACKING FORM ADDRESS 34 80 P<rn f'.:s ~ ' DATE SUBMITTED,;i:U.:_9.~.]ERMIT NUMBER~L\ql TYPE OF PERMIT- eJ CONTRACTORf)llT \Tl ~ ,.0 PHONE ====-RnL':::'~ OWNER :'::> PHONE-.:]J 9 '4.95- 391'4 TYPE OF REQUEST pQ..f'(\lYI..el -.d ~>L(.JmL~{()n ~" [) '01'(' Vi d.uK ~( 7'5 !~~~D "\ . A ~ .Cj~ DATE AND REASON FOR PERMIT DENIAL REQUIRED CONDITIONS MET PRIOR TO PERMIT APPLICATION 7 YES NO N/A CONDITIONS OF APPROVAL DATE OUT DATE IN );d' BUILDING DEPARTMENT ~,,>-\\.q'b 0 ENGINEERING DEPARTMENT )a-- PLANNING DEPARTMENT :"\-\(0-"17', 0 FIRE DEPARTMENT 0 CITY ARBORIST 0 POLICE DEPARTMENT 0 SEWER DISTRICT 0 WATER DISTRICT 0 OTHER '*4j"l8~ CERTIFICATE OF OCCUPANCY~f!'UlffON BUILDING DEPARTMENT DATE OUT o o ENGINEERING DEPARTMENT ::S-;:)D -qq o PLANNING DEPARTMENT o FIRE DEPARTMENT DATE CERTIFICATE OF OCCUPANCY I CERTIFICATE OF COMPLETION ISSUED TEMPORARY CERTIFICATE OF OCCUPANCY DATE IN DATE OUT o BUILDING DEPARTMENT \ . :\d, -q<1 o ENGINEERING DEPARTMENT o PLANNING DEPARTMENT o FIRE DEPARTMENT PLANfllNG ESCROW CONDITIONS AMOUNT ENGINEERING ESCROW CONDITIONS AMOUNT DATE EXPIRED DATE TEMPORARY CERTIFICATE OF OCCUPANCY ISSUED i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type:/ Job Address: Permit Number: ❑ No one available for inspection: Time Re -Inspection required: Yes(; _Nom When corrections have been http✓/www.ci. wheatridge.co. u X online at: