Loading...
HomeMy WebLinkAbout3636 Ames StreetCITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: Job Address: Permit Number: i z —4— ❑ No one available for inspection: Timed AM/PM Re-Inspection required: Ye ww When corrections have been made, schedule for re-inspection online at: http://www.ci.wheatridge.co.uslinspectin Dat Inspe tor: DO NOT REE THIS NOTICE CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: Job Address: Permit Number: i z —4— ❑ No one available for inspection: Timed AM/PM Re-Inspection required: Ye ww When corrections have been made, schedule for re-inspection online at: http://www.ci.wheatridge.co.uslinspectin Dat Inspe tor: DO NOT REE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE �S< Inspection Type: GV -2 _- Job Address: Permit Number: -� Ic? ❑ No one available for inspection: Tim AM/PM Re -Inspection required`: Yes No When corrections have been made, schedule for re -inspection online at: http✓/www. ci. wheatridge.co.uslinspectlon-- Date. -.-I Spector: DO NOT RE,IVIa E THIS NOTICE Inspection Type: Job Address: Permit Number: CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE ❑ No one available for inspection: Time( �PM Re -Inspection required: es o When corrections have b en made, schetfu for re -inspection online at: http//wwwci.whe r cp:unspegtion Dat L.� Insgector� �_ _� Inspection Type: Job Address: Permit Number: CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE M_ ❑ No one available for inspection: Time SAM/PM Re -Inspection required No 1 When corrections have been made edule for re -inspection online at: j httpa/www.ci.wheatridge.co.us� ctio Daa•: �• Inspec DO NOT R' OVE THIS NOTICE u City of Wheat Ridge Residential Solar PERMIT - 201902398 PERMIT NO: 201902398 ISSUED: 11/21/2019 JOB ADDRESS: 3636 Ames St EXPIRES: 11/20/2020 JOB DESCRIPTION: Residential solar rooftop PV system, 6.71 kW , 22 panels. *** CONTACTS *** OWNER (303)422-3799 KRAFT HEATHER K SUB (385)482-0045 LEE HATLEY 180271 BRS FIELD OPS, LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 16,724.13 FEES Total Valuation 0.00 Residential Solar 500.00 ** TOTAL ** 500.00 *** COMMENTS *** *** CONDITIONS *** Approved per plans and red -line notes on plans. Must comply with 2012 IRC, 2017 NEC and all applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections. I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, V building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this ennrt. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performe ,and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. i f -ZI / I Signature of OWNER or CONTRACTOR (Circle one) Date I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Budding Official and may be subject to a fee equal to one-half of the originalpenmt fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Oficial and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change, of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shalt not be construed to be a permit for, or an approval of, any violation of any provision of any applicable code or anYOer4inance or re4ibtion of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City of �W heat' id MUN[Ty DEVELOPMEN r Building & Inspection Services 7500 W. 29' Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 " Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permitsCD-ci.wheatridge.co.us FOR OFFICE USE ONLY Date: ///1Z///9 Plan/P mi't # Plan Review F e: Building Permit Application *** Complete all applicable highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: 3636 Ames Street Wheat Ridge, Colorado 80212 Property Owner (please print): Heather Kraft Phone: Property Owner Email: Tenant Name (Commercial Projects Only) Property Owner Mailing Address: (if different than property address) Address: 3636 Ames Street Wheat Ridge , Colorado 80212 City, State, Zip: Architect/Engineer: Architect/Engineer E-mail: Contractor Name: BRS Field Ops LLC City of Wheat Ridge License #: 180271 Phone: Phone: Contractor E-mail Address: permitting.department@blueravensolar.com For Plan Review Questions & Comments (please print): CONTACT NAME (please print): CONTACT EMAIL(p/ease print) Linsey McClain 385-482-0045 Phone: 385-482-0045 permitting.department@blueravensolar.com Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form): Electrical: Plumbing: Mechanical: W.R. City License # W.R. City License # W.R. City License # Other City Licensed Sub: Other City Licensed Sub: City License # City License # Complete all highlighted fields. [—]COMMERCIAL D RESIDENTIAL Provide description of work: For ALL projects, provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc. Residential Solar Rooftop PV System 6.71 kW 6.71 kW residential solar array Sq. Ft./LF Amps 150 385 BTUs n/a Gallons n/a Squares For Solar: 6.71 KW 22 # of Panels n/a Requires Structural For Commercial Projects Only: Occupancy Type: Construction Type: Occupancy Load: Square Footage: _ Project Value: (Contract value or the cost of all materials and labor included in the entire project) $ $16,724.13 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances. rules or regulations of the City of Wheat Ridge or covenants. easements or restrictions of record; that at[ measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume fidl responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLE ONE: (OWNER) (CONTR4CTOR) or (AUTHORIZED REPRESENTATIVE) oJ' (OWVER) (CONTR4CTOR) For BRS Field Ops LLC 11/07/2019 Signature (first and last name): DATE: Printed Name: Linsey McClain ZONING COMMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: Review r: PUBLIC WORKS COMMENTS: Reviewer: 17:'J,1:�111T 1 AT * ► OCCUPANCY CLASSIFICATION: CONSTRUCTION TYPE: Building Division Valuation: c.� t i'- ! Domus Structural Engineering, LLC D � �, P.O. Box 6986 Broomfield, CO 80021 I K E tom, T E` R A is ���� + 530-864-7055 - N G T N E F R t N G, L 1, C, C Domusstructural@gmail.com November 7, 2019 To: Blue Raven Solar 1403 North Research Way, Building Orem, UT. 84097 Subject: Certification Letter Kraft Residence 3636 Ames St. Wheat Ridge, CO. 80212 To Whom It May Concern, A jobsite observation of the condition of the existing framing system was performed by an audit team of Blue Raven Solar as a request from Domus Structural Engineering. All review is based on these observations and the design criteria listed below and only deemed valid if provided information is true and accurate. On the above referenced project, the roof structural framing has been reviewed for additional loading due to the installation of the solar PV addition to the roof. The structural review only applies to the section of the roof that is directly supporting the solar PV system and its supporting elements. The observed roof framing is described below. If field conditions differ, contractor to notify engineer prior to starting construction. The roof structures of (MP1,2,3&4) consist of composition shingle on 1x decking that is supported by 2x6 rafters @ 24"o.c. with ceiling joists acting as rafter ties. The rafters have a max projected horizontal span of 13'-0", with a slope of 25 degrees. The rafters are connected at the ridge to a ridge board and are supported at the eave by a load bearing wall. The existing roof framing systems of (MP1,2,3&4) are judged to be inadequate to withstand the loading imposed by the installation of the solar panels. Structural reinforcement is required. Sister upgrade is required for (MP1,2,3&4) on all rafters that directly support solar PV and that span mor than 9'-4". Stitch new 2x6 DF#2 (min) to existing member with Simpson SDW 22300 screws @ 16"o.c. or 10d nails @ 6"o.c.. Lap as needed with 4'-0" minimum lap per attached detail. The spacing of the solar standoffs should be kept at 72" o.c. for landscape and 48" o.c. for portrait orientation, with a staggered pattern to ensure proper distribution of loads. The scope of this report is strictly limited to an evaluation of the fastener attachment, underlying framing and supporting structure only. The attachment's to the existing structure are required to be in a staggered pattern to ensure proper distribution of loading. All panels, racking and hardware shall be installed per manufacturer specifications and within specified design limitations. All waterproofing shall be provided by the manufacturer. Domus Structural Engineering assumes no responsibility for misuse or improper installation of the solar PV panels or racking. Note: Seismic check is not required since Ss<.4g and Seismic Design Category (SDC) < B Kraft Residence, Wheat Rldge, CO 1 Domus Structural Engineering, LLC o m u 4 P.O. Box 6986 Broomfield, CO 80021 -S' ry' ` 530-864-7055 1- Z G T `: i R I N G L I. C Domusstructural@gmail.com Design Criteria: • Applicable Codes = 2012 IBC/IRC, ASCE 7-10 • Roof Dead Load = 10 psf (MP1,2,3&4) • Roof Live Load = 20 psf • Wind Speed = 105 mph (Vult), Exposure C, Risk Category II • Roof Snow Load = 30 psf • Attachments: 1 - 5/16" dia. lag screw with 2.5 inch min embedment depth, at spacing shown above. Please contact me with any further questions or concerns regarding this project. Sincerely, John Calvert, P.E. Project Engineer 'y: v :° 43019 se Digitally signed by John A. Calvert Date: 2019.11.07 12:44:46 -06'00' City of VJ 3e It Ridge tildis'.g Civis"orl Kraft Residence, Wheat Rldge, CO 2 (E) RAFTERS IX DECKING OR SHEATHING (N) INSTALL SIMPSON A34 CLIP. (N) SISTER MEMBER TO BE FULL LENGTH. ATTACH TO (E) RAFTER W/ SIMPSON SDW22300 SCREWS STAGGERED TOP AND BOTTOM @ 16" O.C. MINIMALLY NOTCH NEW (E) CEILING JOIST SISTER RAFTER TO BEAR DIRECTLY ON (E) TOP PLATE OF WALL. OPTION 1 - FULL LENGTH SISTER SEE LETTER FOR UPGRADE LAP LENGTH AND SIZE. 1X DECKING OR SHEATHING MINIMALLY NOTCH NEW (E) CEILING JOIST SISTER RAFTER TO BEAR DIRECTLY ON (E) TOP PLATE OF WALL. OPTION 2 - OVERLAPPED SISTER SEE LETTER FOR UPGRADE LAP LENGTH AND SIZE. (N) SISTER RAFTER (N) SISTER RAFTER (E) RAFTER (N) INSTALL SIMPSON A34 CLIP. (N) SISTER MEMBER TO BE FULL LENGTH. ATTACH TO (E) RAFTER W/ SIMPSON SDW22300 SCREWS STAGGERED TOP AND BOTTOM @ 16" O.C. SECTION A -A 11/7/1 cit of S1 SISTER UPGRADE OPTIONS w� ,Q e uild+.n9 G'ivis�on PROJECT NAME: Rafter sister upgrade Scale: N.T.S. Domus Structural Engineering, LLC. Date: 4/5/18 P.O. BOX 6986 Project Number: Solar PV Broomfield, CO 80021 Project Description: Rafter sister upgrade detail and Drawn By: JAC Drawing Name: (530) 864-7055 specifications. Revisions: Domusstructural@gmail.com A S i S i B Domus Structural Engineering, LLC o M u S P.O. Box 6986 �+ Broomfield, CO 80021 -,L-)- T RUCTUR=1I. 530-864-7055 N G l N F E R jN G i, jy C, Domusstructural@gmail.com Gravity Loading Roof Snow Load Calculations 3.31 psf p9 = Ground Snow Load = 30 psf pf = 0.7 Ce Ct I p9 (ASCE7 - Eq 7-1) Ce = Exposure Factor = 1 (ASCE7 - Table 7-2) Ct = Thermal Factor = 1 (ASCE7 - Table 7-3) 1= Importance Factor = 1 pf = Flat Roof Snow Load = 30.0 psf PS = CsPf (ASCE7 - Eq 7-2) Cs = Slope Factor = 1 ps = Sloped Roof Snow Load = 30.0 psf PV Dead Load = 3 psf (Per Blue Raven Solar) DL Adjusted to 25 Degree Slope 3.31 psf PV System Weight 3.00 Weight of PV System (Per Blue Raven Solar) 3.0 psf X Standoff Spacing = 4.00 ft Y Standoff Spacing = 5.50 ft Standoff Tributary Area = 22.00 sft Point Loads of Standoffs 66 Ib Note: PV standoffs are staggered to ensure proper distribution of loading Roof Live Load = 20 psf Note: Roof live load is removed in area's covered by PV array. Roof Dead Load (MP1,2,3&4) Composition Shingle 4.00 1x Decking 3.00 Double 2x6 Rafters @ 24"o.c. 2.30 Vaulted Ceiling 0.00 (Ceiling Not Vaulted) Miscellaneous 0.70 Total Roof DL (MP1,2,3&4) 10.0 psf DL Adjusted to 25 Degree Slope 11.0 psf 51 U"i ASJon Kraft Residence. Wheat Rldae. CO 3 Domus Structural Engineering, LLC D o m� fi s P.O. Box 6986 Broomfield, CO 80021 - 530-864-7055 -- N G T N E F R INCA L T, C Domusstructural@gmail.com Wind Calculations Per ASCE 7-10 Components and Cladding Input Variables Wind Speed 105 mph Exposure Category C Roof Shape Hip/Gable Roof Slope 25 degrees Mean Roof Height 20 ft Effective Wind Area 19.3 ft Design Wind Pressure Calculations Wind Pressure P = qh*G*Cn qh = 0.00256 * Kz * Kzt * Kd * V^2 (Eq. 30.3-1) Kz (Exposure Coefficient) = 0.9 (Table 30.3-1) Kzt (topographic factor) = 1 (Fig. 26.8-1) Kd (Wind Directionality Factor) = 0.85 (Table 26.6-1) V (Design Wind Speed) = 105 mph (Fig. 26.5-1A) Risk Category = 11 (Table 1.5-1) qh = 21.59 Y Standoff Spacing = 5.50 2.75 0.6*qh= 12.95 Standoff Uplift Calculations -Portrait Zone 1 Zone 2 Zone 3 Positive GCp = -0.84 -1.39 -2.23 0.38 (Fig. 30.4-1) Uplift Pressure = -10.86 psf -18.01 psf -28.86 psf 10.0 psf (Minimum) X Standoff Spacing = 4.00 4.00 2.67 Y Standoff Spacing = 5.50 2.75 2.75 Tributary Area = 22.00 11.00 7.33 Footing Uplift = -239 Ib -198 Ib -212 Ib Standoff Uplift Calculations -Landscape Zone 1 Zone 2 Zone 3 Positive GCp = -0.84 -1.39 -2.23 0.38 (Fig. 30.4-1) Uplift Pressure = -10.86 psf -18.01 psf -28.86 psf 10.0 psf (Minimum) X Standoff Spacing = 6.00 6.00 4.00 Y Standoff Spacing = 3.50 1.75 1.75 Tributary Area = 21.00 10.50 7.00 Footing Uplift = -228 Ib -189 Ib -202 Ib Standoff Uplift Check Maximum Design Uplift = -239 Ib Standoff Uplift Capacity = 450 Ib 450 Ib capacity > 239 Ib demand Therefore, OK itY i Fastener Capacity Check Fastener = 1 - 5/16" dia. lag Wh Ri9e Number of Fasteners = 1 Depth = 2.5 iDA n9i SonEmbedment Pullout Capacity Per Inch = 250 Ib BU Fastener Capacity = 625 Ib w/ F.S. of 1.5 & DOL of 1.6= 667 Ib 667.2 Ib capacity > 239 Ib demand Therefore, OK Kraft Residence. Wheat Rldae. CO 4 EN Ci TNT'T'R Tititx Domus Structural Engineering, LLC P.O. Box 6986 Broomfield, CO 80021 530-864-7055 t ) Domusstructural@gmail.com Framing Check (MP1,2,3&4) PASS - With Framing Upgrades w = 89 plf Dead Load 11.0 psf PV Load 3.3 psf Snow Load 30.0 psf Double 2x6 Rafters @ 24"o.c. O Governing Load Combo = DL + SL Member Span = 13'- 0" Total Load 44.3 psf Member Properties - Based on Upgraded Section Member Size S (in "3) 1 (in^4) Lumber Sp/Gr Member Spacing Double 2x6 15.13 41.59 DF#2 @ 24"o.c. Check Bending Stress Fb (psi) = fb x Cd x Cf x Cr (NDS Table 4.3. 1) 900 x 1.15 x 1.3 x 1.15 Allowed Bending Stress = 1547.3 psi Maximum Moment = (wL^2) / 8 = 1873.53 ft# = 22482.36 in# Actual Bending Stress = (Maximum Moment) / S =1486.5 psi Allowed > Actual -- 96.1% Stressed -- Therefore, OK Check Deflection Allowed Deflection (Total Load) = L/180 (E =1600000 psi Per NDS) = 0.866 in Deflection Criteria Based on = Simple Span Actual Deflection (Total Load) _ (5*w*L^4) / (384*E*I) = 0.857 in = L/183 > U180 Therefore OK Allowed Deflection (Live Load) _ Actual Deflection (Live Load) _ L/240 0.65 in (5*w*L^4) / (384*E*I) 0.580 in L/269 > L/240 Therefore OK Check Shear Member Area = 16.5 in^2 Fv (psi) = 180 psi (NDS Table 4A) Allowed Shear = Fv * A = 2970 Ib Max Shear (V) = w * L / 2 = Ib Allowed > Actual -- 19.5% Stressed -- Therefore, OK Kraft Residence. Wheat Rldae. CO 5 GENERALNOTES CODES AND STANDARDS 1. ALL WORK SHALL COMPLY WITH 2017 NATIONAL ELECTRIC CODE (NEC), 2012 INTERNATIONAL RESIDENTIAL CODE (IRC), 2012 INTERNATIONAL BUILDING CODE (IBC), 2012 INTERNATIONAL PLUMBING CODE (IPC), AND ALL STATE AND LOCAL BUILDING, ELECTRICAL, AND PLUMBING CODES. 2. DRAWINGS HAVE BEEN DETAILED ACCORDING TO UL LISTING REQUIREMENTS. 3. TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS (WHEN PROVIDED) IN ACCORDANCE WITH NEC CODE 110.14(D) ON ALL ELECTRICAL CONNECTIONS. SITE NOTES I OSHA REGULATION 1. A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 2. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS AN UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 3. THE SOLAR PV INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 4. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SHALL SERVE TO PROTECT THE BUILDING OR STRUCTURE. 5. NO. OF SHINGLE LAYERS- 2 SOLAR CONTRACTOR 1. MODULE CERTIFICATIONS WILL INCLUDE UL1703, IEC61646, IEC61730. 2. IF APPLICABLE, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE MARKED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 3. AS INDICATED BY DESIGN, OTHER NRTL LISTED MODULE GROUNDING DEVICES MAY BE USED IN PLACE OF STANDARD GROUNDING LUGS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. 4. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. 5. CONDUIT POINT OF PENETRATION FROM EXTERIOR TO INTERIOR TO BE INSTALLED AND SEALED WITH A SUITABLE SEALING COMPOUND. 6- DC WIRING LIMITED TO MODULE FOOTPRINT W/ ENPHASE AC SYSTEM. 7. ENPHASE WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS. 8. MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC UNLESS NOT AVAILABLE. 9 ALL INVERTERS, MOTOR GENERATORS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AC PHOTOVOLTAIC MODULES, DC COMBINERS, DC -TO -DC CONVERTERS, SOURCE CIRCUIT COMBINERS, AND CHARGE CONTROLLERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (B). 10. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. EQUIPMENT LOCATIONS 1. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION [NEC 110.26]. 2. EQUIPMENT INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY [NEC 690.31 (A) -(B)] AND [NEC TABLE 310.15 (B)]. 3. ADDITIONAL AC DISCONNECTS SHALL BE PROVIDED WHERE THE INVERTER IS NOT ADJACENT TO THE UTILITY AC DISCONNECT, OR NOT WITHIN SIGHT OF THE UTILITY AC DISCONNECT. 4. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 5. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. RECEIVED =�' " Wheat V. CoMMUNnV DMtomENT NOV 1 4 2019 APPROVED �} S Per Reviewed for Code Comolia.� AERIAL VIEW 0 DESIGN CRITERIA ASCE 7 WIND SPEED: 105 MPH GROUND SNOW LOAD. 30 PSF EXPOSURE CATEGORY: C SEISMIC DESIGN CATEGORY: B SCOPE OF WORK i SITE SPECIFICATIONS OCCUPANCY -R3 CONSTRUCTION - V -B ZONING: RESIDENTIAL INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM 6.71 kW"6C PHOTOVOLTAIC SOLAR ARRAY ROOF TYPE: Comp Shingle MODULES: (22) Seraphim SEG-6MB-305BB f VERTER(S): Enphase IQ7-60-2-US,---- CKING: Unirac SFM Infinity -♦liditr of oe•mit }'h. issuare - Jo v�rmit or arppro.M ofos and computotiom s hall mot ue a pems4 Jar, or orr oppggt of�, to any of the provision of the �)Wa#V codr a Mo^Y Gty ordMonlm. prrsU" to give authority to vicket of comet the vrovh7ws y the codes or otlser ordrno sten M the OW Ao, me St sand Approval Notes: i 1)Verify or provide supplemental ground rod or rods per 2017 NEC Art. 250.53(A)(2). 2) Natural Gas piping to be bonded s per 2017 NEC Art. 250.104(B). 3)Bond P/V panels to the building Grounding Electrode System per 2017 NEC Art. 690(A). _ SHEETINDEX W. " 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 W WW.BLUERAVENSOLAR. COM CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT B5 USED FOR THE BENEFIT OF 1 ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL I TI BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF 1 BLUERAVENSOLAR LLC. NABCEP CERTIFIED:]C PV INSTALLATION 0 PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR. BRS FIELD OPS 385.498.6700 PV1 - COVER SHEET PV2 - PROPERTY PLAN PV3 - SITE PLAN PV4 - EQUIPMENT & ATTACHMENT DETAIL PV5 - ELECTRICAL SINGLE LINE DIAGRAM PV6 - ELECTRICAL CALCULATIONS & ELECTRICAL NOTES PV7 - MAIN BREAKER DERATE CALCS. (IF NEEDED) PV8 - LABELS & LOCATIONS PV9 - CUSTOM DIRECTORY PLACARD (IF NEEDED - NEC 690.56(B)) L NRA,N.NG BY DIN ENGINEERING DATE November 7, 2019 PROJECT NUMBER 67828749 SHEET NAME COVER SHEET PAGE NUMBER RE,,S,CN PV1 0 N d N O 0 O � Z t0 O O w Q L U N U) O z cz Y Q a' w LLJ U) Z co C/) 0 NRA,N.NG BY DIN ENGINEERING DATE November 7, 2019 PROJECT NUMBER 67828749 SHEET NAME COVER SHEET PAGE NUMBER RE,,S,CN PV1 0 DC SYSTEM SIZE: 6.71 kW DC ROOF TYPE: Comp Shingle (22) Seraphim SEG-6MB-305BB Enphase IQ7-60-2-US,----INVERTER DATE November 7, 2019 PROJECT NUMBER 67828749 SHEET NAME PROPERTY PLAN PAGE NUMBER REVISION PV2 0 LEGEND NV INVERTER & DC DISCONNECT BLUE RAVEN SUB (E) SUBPANEL LC (N) LOAD CENTER 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 AC AC DISCONNECT 800-377-4480 WWW.BLUERAVENSOLAR COM ' ❑M UTILITY METER / SERVICE PANEL CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE 69'-7"USED FOR THE BENEFIT OF 721-811 JB JUNCTION BOX ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN F]COMBINER BOX PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION. EXCEPT IN CONNEC TION WITH THE PV S PV REVENUE METER SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE MP1 WRITTEN PERMISSION OF # OF MODULES: 7 ° M N ® FIRE SETBACK BLUERAVENSOLAR LLC NAEC LLI AZIMUTH:2700 MSP EMT CONDUIT RUN PITCH:25° ( TO BE DETERMINED IN FIELD) S9'-1" 0 P" 58'-3" cit O TSRF:75%AC CERTIFIED AREA: 200.763 SQ. FT ° PV WIRE STRING PV INSTALLATION Q O ' ° Cl 71'-3" i PROFESSIONAL ZO O Js MP3 PROPERTY LINE Scott Gurney uPv-olnls-olssss # OF MODULES: ° 3 # OF MODULES: 6 cr_L. AZIMUTH -270' JB AZIMUTH:90° SCALE: 1/16"=1'-0" CONTRACTOR: L ° PITCH:25 0 J6 JB 19- ° PITCH:25° 0 a e 16 - BRS FIELD OPS 0 385.498.6700 TSRF:76% m TSRF:62% AREA: 96.325 SQ. FT ® AREA: 297.098 SQ. FT 140' MP2 N # OF MODULES: 6 0 AZIMUTH:1800 00 PITCH:25°Z TSRF:79% a O o AREA: 203.257 SQ. FT Q)U N Q U) / /L� W O Y Z E U) <( �. Cz co (/) Z � DRAWING BY DIN ENGINEERING DC SYSTEM SIZE: 6.71 kW DC ROOF TYPE: Comp Shingle (22) Seraphim SEG-6MB-305BB Enphase IQ7-60-2-US,----INVERTER DATE November 7, 2019 PROJECT NUMBER 67828749 SHEET NAME PROPERTY PLAN PAGE NUMBER REVISION PV2 0 MP1 # OF MODULES: 7 AZIMUTH:270° PITCH:25° TSRF:75% AREA: 200.763 SQ. FT LU O LL O H Z O ry I I 27'-2" HVAC O 0 15'-10" rig MP4 19'-8" JB r # OF MODULES: 3 �B AZIMUTH:2700 PITCH:250 Lc TSRF:76% AREA: 96.325 SQ. FT y4sqfc 11C DISH Ip 7, MA, 1, OVERHEAD SERVICE LINE ❑ ❑ ❑ O O AC C 35'-6" INVERTER & DC DISCONNECT RAAVE BLUE SUB El LC E (N) LOAD CENTER MP3 N # OF MODULES: 6 JB \11C AC DISCONNECT AZIMUTH:90° Y WWW.BLUERAVENSOLAR COM ElPITCH-250 UTILITY METER / SERVICE PANEL TSRF:62% WRI 29'-1" MP2 # OF MODULES: 6 AZIMUTH:180° PITCH:25° TSRF:79% AREA: 203.257 SQ. FT DC SYSTEM SIZE: 6.71 kW DC ROOF TYPE: Comp Shingle (22) Seraphim SEG-6MB-305BB Enphase IQ7-60-2-US,----INVERTER AREA: 297.098 SQ. FT LEGEND ' Structural upgrades required on rafters that directly support solar PV and that have a span more than 9'-4". Install new 2x6 sister onto exsitning rafters. See structural detail and calculations package for additional info. Sealed For Existing Roof & Attachment Only 431 X' v Digitally signed by;...•°`� John A. Calvert' Date: 2019.1 1.07 12:47:05 -06'00' 11/7/19 6" X INV INVERTER & DC DISCONNECT RAAVE BLUE SUB (E) SUBPANEL LC E (N) LOAD CENTER 1403 N RESEARCH WAY, BUILDING J N OREM, UT 84097 AC AC DISCONNECT 800-377-4480 Y WWW.BLUERAVENSOLAR COM ❑M UTILITY METER / SERVICE PANEL CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE o r� USED FOR THE BENEFIT OF JB JUNCTION BOX ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT OL BE DISCLOSED IN WHOLE OR IN C❑ COMBINER BOX PART TO OTHERS OUTSIDE Q RECIPIENTS ORGANIZATION. U N EXCEPT IN CONNEC TION WITH THE PV PV REVENUE METER SALE AND USE OF THE RESPECTIVE Lu W } F- Cn EQUIPMENT, WITHOUT THE M WRITTEN PERMISSION OF ® FIRE SETBACK BLUERAVENSOLAR LLC. EMT NDUIT RUN NABCEP (TO BE DETERMINED IN FIELD) CERTIFIED PV WIRE STRING PV INSTALLATION i PROFESSIONAL PROPERTY LINE Scott Gurney I # PV -011719-015866 SCALE: 1/8" = 1'-0" CONTRACTOR: C 2 e BRS FIELD OPS 385.498.6700 Structural upgrades required on rafters that directly support solar PV and that have a span more than 9'-4". Install new 2x6 sister onto exsitning rafters. See structural detail and calculations package for additional info. Sealed For Existing Roof & Attachment Only 431 X' v Digitally signed by;...•°`� John A. Calvert' Date: 2019.1 1.07 12:47:05 -06'00' 11/7/19 6" X DRAWING BY DIN ENGINEERING DATE November 7, 2019 PROJECT NUMBER 67828749 71 d ET NAME -o� SITE PLAN PAGE NUMBER REVISION PV3 0 N M> N CD Y 0 o r� z OL o LU Q o U N O Z Y W E Q,. Q) Lu W } F- Cn M = M 0 DRAWING BY DIN ENGINEERING DATE November 7, 2019 PROJECT NUMBER 67828749 71 d ET NAME -o� SITE PLAN PAGE NUMBER REVISION PV3 0 PV ARRAY INFORMATION LL LL O 0 Z Q _ �o W O O� m UL) J in Q H LU 0 y LL LL O 0 Z Q W 0o O w u J - Q M U J_ (n Q F- LU 0 a PV MODULE COUNT: 22 MODULES # OF ATTACHMENT POINTS: 52 ARRAY AREA: Module Count x 17.51ft2 = 385.2ft2 ROOF AREA: 1000.7ft2 % OF ARRAY/ROOF: 38.5% ARRAY WEIGHT. Module Count x 50lbs = 1100.Olbs DISTRIBUTED LOAD: Array Weight - Array Area = 2.86 Ibs/ft2 POINT LOAD: Array Weight _ Attachments = 21.2lbs/attachment Infinity IMRAIL Seraphim SEG-6MB-305BB PV MODULE (E) ROOF MEMBRANE UNIRAC SLIDERS AND TRIMRAIL ROOF ATTACHMENTS FLASHING 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER (E) BUILDING STRUCTURE Unirac SFM Infinity Seraphim SEG-6MB-305BB PV MODULE (E) ROOF MEMBRANE UNIRAC SLIDERS FLASHING 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER (E) BUILDING STRUCTURE PV MODULE (BEHIND TRIM RAIL) Unirac SFM Infinity TRIM RAIL RACKING ATTACHMENTS TO BE STAGGERED BY SHIFTING EACH SUBSEQUENT ROW OF ATTACHMENTS ONE RAFTER OVER WIDTH ROOF TYPE: Comp Shingle ROOF FRAMING TYPE: Rafter SFM Infinity Flashkit Unirac SFM Infinity FRAME RAFTER OR TOP CHORD(TRUSS) 2x6 @ 24"O.C. CEILING JOIST OR BOTTOM CHORD(TRUSS) 2x6 @ 24"O.C. Structural upgrades required on rafters that directly support solar PV and that have a span more than 9'-4". Install new 2x6 sister onto exsitning rafters. See structural detail and calculations package for additional info. PORTRAIT I-LUE RAVEN 1403 N RESEARCH WAY. BUILDING J OREM, UT 84097 LANDSCAPE 800-377-4480 WWW BLUERAVENSOLAR COM ARRAY DETAIL, FRONT VIEW Scale: 3/8" = V-0" PORTRAIT LANDSCAPE ARRAY DETAIL, SIDE VIEW Scale: 3/8" = V-0" Sealed For Existing Roof & Attachment Only 11/7/19 C:%W OL win ici9e . 9 civist e CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR -1-C. rZNABCEP C_ER_TIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 IN DRAWING BY DIN ENGINEERING DATE November 7, 2019 PROJECT NUMBER 67828749 SHEET NAME EQUIP. DETAIL PAGE NUMBER REVISION PV4 1 0 N �> N CD Y 00 O I� Z O L o w Q o L U N U) O�- Z Y U) Q -a Lu coo to H W Z cy) >� > Q DRAWING BY DIN ENGINEERING DATE November 7, 2019 PROJECT NUMBER 67828749 SHEET NAME EQUIP. DETAIL PAGE NUMBER REVISION PV4 1 0 (E) RAFTERS (E; 1X DECKING OR SHEATHING (N) INSTALL SIMPSON A34 CLIP. (N) SISTER MEMBER TO BE FULL LENGTH. ATTACH TO (E) RAFTER W: SIMPSON SDW22300 SCREWS STAGGERED TOP AND BOTTOM @ 16" O.C. MINIMALLY NOTCH NEW �— (E) CEILING JOIST SISTER RAFTER TO BEAR DIRECTLY ON (E) TOP PLATE OF WALL. OPTION 1 - FULL LENGTH SISTER SEE LETTER FOR UPGRADE LAP LENGTH AND SIZE. SISTER RAFTER TO BEAR DIRECTLY ON (E) TOP PLATE OF WALL. OPTION 2 - OVERLAPPED SISTER SEE LETTER FOR UPGRADE LAP LENGTH AND SIZE. (N) SISTER RAFTER (N) SISTER RAFTER (E) RAFTER SECTION A -A SISTER UPGRADE OPTIONS (N) INSTALL SIMPSON A34 CLIP. TER MEMBER TO BE FULL JGTH. ATTACH TO (E) RAFTER WI IPSON SDW22300 SCREWS 1GGERED TOP AND BOTTOM @ O.C. Structural upgrades required on rafters that directly support solar PV and that have a span more than 9'-4". Install new 2x6 sister onto exsitning rafters. See structural detail and calculations package for additional info. Sealed For Existing Roof & Attachment Only 1403 N RESEARCH WAY, BUILDING J OREM,UT84097 800-377-4480 WWW BLUERAVENSOLAR.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNED TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLARLLC NABGEP CE_RTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 N DRAWING By DIN ENGINEERING DATE November 7. 2019 PROJECT NUMBER 67828749 e QR1a� SHEET NAME 11/7/19 ..,;5, A EQUIP. DETAIL PAGE NUMBER REVISION P, 0 N 0 N O 0 o r� z O o w Q o L U N U) O LL Y Q w LU U) +r _ co >� C) DRAWING By DIN ENGINEERING DATE November 7. 2019 PROJECT NUMBER 67828749 e QR1a� SHEET NAME 11/7/19 ..,;5, A EQUIP. DETAIL PAGE NUMBER REVISION P, 0 PV BREAKER TO BE LOCATED OPPOSITE END OF BUSSING FROM MAIN BREAKER (E) GROUNDING ELECTRODE (S) Approval Notes: 1)Verify or provide supplemental ground rod or rods per 2017 NEC Art. 250.53(A)(2). 2) Natural Gas piping to be bonded s per 2017 NEC Art. 250.104(B). 3)Bond P/V panels to the building Grounding Electrode System per 2017 NEC Art. 690(A). INTERCONNECTION NOTES 1. ONE OF THE METHODS THAT FOLLOWS SHALL BE USED TO DETERMINE THE RATINGS OF BUSBARS AND PANELBOARDS. (a) THE SUM OF 125 PERCENT OF THE INVERTER(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED THE AMPACITY OF THE BUS BAR. (b) WHERE TWO SOURCES, ONE THE UTILITY AND THE OTHER AN INVERTER ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE INVERTER(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR [NEC 705.12]. PV Production meter notes. 1. The self-contained metering will be in compliance with the most recent revision of the Xcel Energy Standard; specifically Section 4.11. 2. The PV production meter will be required to have the PV generation wired to the line side terminals (top of meter block). 3. The meter socket for the PV production meter shall be marked with a stamped brass, aluminum, or stainless steel tag, indicating the address including the unit, typically "PV PROD" in accordance with the requirements for "Meter Identification" in Section 4.14.4 of the Xcel Energy Standard. 4. The PV production meter shall be located within ten (10) feet of the existing utility meter. If there is any reason this cannot be accomplished, a site plan showing proposed equipment locations shall be submitted for review. The local meter shop must approve the site plan for application approval; site meetings can be arranged upon request. NOTE TO INSTALLER: The current Placard that we require at the utility meter and AC Disconnect is a yellow with black lettering 11 C Ga�°ierorc`.c'bJ ta�3�"Or�;o lggg r 8 � (1) ' 10 AWG THHN/THWN-2, CU., BLACK (Ll) 22.0 AAC (2) 12 - 2 OF -B W/G, THHN/THWN-2, SOLID CU. MAX 11.0 A A (1) 12 - 2 OF -B W/G, THHN/THWN-2, SOLID CU. MAX 11.0 A A (1) 12-2TC-ER,THHN/THWN-2, CU. MAX 11.0 A AC 15 (1) 10 AWG THHN/THWN-2, CU., RED (L2) 240 V AC 240 V A12] 240 V A 1 (1) 6 AWG BARE, CU (EGC) 240 V AC O (1) 10 AWGTHHN/THWN-2, CU., WHITE (N) 2- O o Q W U (1) 10 AWG THH N/THWN-2, CU., GREEN (EGC) (1) 3/4 INCH EMT EXTERIOR Y N (1) 3/4 INCH EMT EXTERIOR H (n = c cco INTERIOR EXTERIOR BLUE RAV E 1. ALL CONDUIT TO BE RAN AT LEAST 7/8" ABOVE ROOF SURFACE WHERE EXPOSED TO SUNLIGHT. 2 TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS (WHEN 1403 N RESEARCH WAY, BUILDING J PROVIDED) IN ACCORDANCE WITH NEC CODE 110.14(D) ON ALL ELECTRICAL CONNECTIONS. OREM, UT 84097 3. CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. 800-377-4480 WWW.BLUERAVENSOLAR COM (22) Seraphim SEG-6MB-305BB CONFIDENTIAL - THE INFORMATION UL 1703 COMPLIANT HEREIN CONTAINED SHALL NOT BE En Kase IQ7-60-2-US MICRO INVERTERS (22 ) P USED FOR THE BENEFIT OF ANYONE EXCEPT UL 1741 COMPLIANT BLUERAVENSOLAR NOR SHALL IT 11 MODULES MAX FOR ALL SUB -BRANCH BE DISCLOSED IN WHOLE OR IN CIRCUIT(S) TO COMPLY WITH VRISE CALCS PART O OTHERS OUTSIDE Enphase IQ Combiner 3 JUNCTION BOX ENTS X-IQ-AM1-240-3 (OPTIONAL IF OF -B EXCEPT IN CONNEC TION WITH THE (SOLAR LOADS ONLY) CABLE USED FOR SALE AND USE THE RESPECTIVE ENTIRE HOMERUN) JUNCTION BOX EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF (E)150A MAIN SERVICE PANEL = _ = (1) CIRCUIT BLUERAVENSOLAR LLC (E)150A/2P MAIN BREAKER UTILITY PV (N)20A/2P OF 11 MODULES PRODUCTION METER 200A PV AC DISCONNECT Lz Lz L: (E)150A / 2P LEVER BYPASS NON-FUSED G c NA BC E P METER SOCKET LOCKABLE, VISIBLE OPEN N 30A, 240V, 2 -POLE C E RTI F_I D u (E)LOADS " I _ _E PV INSTALLATION 2 JUNCTION BOX ' PROFESSIONAL Scott Gurney (1) CIRCUIT = — # PV -011719-015866 (N)30A/2P (N)20A/2P u u OF 11 MODULES u Lz Lz u CONTRACTOR: " G BRS FIELD OPS N EGC IIII- G G G G 385.498.6700 120/240 VAC 60HZ 1 PHASE TO UTILITY 5 ENPHASE COMBINER BOX WILL BE V 2 1 GRID c ACCESSIBLE TO UTILITY COMPANY 24/7 PV BREAKER TO BE LOCATED OPPOSITE END OF BUSSING FROM MAIN BREAKER (E) GROUNDING ELECTRODE (S) Approval Notes: 1)Verify or provide supplemental ground rod or rods per 2017 NEC Art. 250.53(A)(2). 2) Natural Gas piping to be bonded s per 2017 NEC Art. 250.104(B). 3)Bond P/V panels to the building Grounding Electrode System per 2017 NEC Art. 690(A). INTERCONNECTION NOTES 1. ONE OF THE METHODS THAT FOLLOWS SHALL BE USED TO DETERMINE THE RATINGS OF BUSBARS AND PANELBOARDS. (a) THE SUM OF 125 PERCENT OF THE INVERTER(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED THE AMPACITY OF THE BUS BAR. (b) WHERE TWO SOURCES, ONE THE UTILITY AND THE OTHER AN INVERTER ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE INVERTER(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR [NEC 705.12]. PV Production meter notes. 1. The self-contained metering will be in compliance with the most recent revision of the Xcel Energy Standard; specifically Section 4.11. 2. The PV production meter will be required to have the PV generation wired to the line side terminals (top of meter block). 3. The meter socket for the PV production meter shall be marked with a stamped brass, aluminum, or stainless steel tag, indicating the address including the unit, typically "PV PROD" in accordance with the requirements for "Meter Identification" in Section 4.14.4 of the Xcel Energy Standard. 4. The PV production meter shall be located within ten (10) feet of the existing utility meter. If there is any reason this cannot be accomplished, a site plan showing proposed equipment locations shall be submitted for review. The local meter shop must approve the site plan for application approval; site meetings can be arranged upon request. NOTE TO INSTALLER: The current Placard that we require at the utility meter and AC Disconnect is a yellow with black lettering 11 C Ga�°ierorc`.c'bJ ta�3�"Or�;o lggg r 8 � DRAWING BY DIN ENGINEERING DATE November 7, 2019 PROJECT NUMBER 67828749 SHEET NAME ELEC. 3 LINE DIAG. PAGE NUMBER REVISION P1 0 N N O 00 O Z 2- O o Q W U CK O Z Y N E QLU O } H (n = c cco DRAWING BY DIN ENGINEERING DATE November 7, 2019 PROJECT NUMBER 67828749 SHEET NAME ELEC. 3 LINE DIAG. PAGE NUMBER REVISION P1 0 IVIUUULt Jrek_It-I L.A I IUNJ RATED POWER (STC) MODULE VOC MODULE VMP MODULE IMP MODULE ISC VOC CORRECTION �erapnim Jto-blylls- :sb 305 W 39.9 V DC 32.3 V DC VMP CORRECTION SERIES FUSE RATING ADJ. MODULE VOC @ ASHRAE LOW TEMP ADJ. MODULE VMP @ ASHRAE 2% AVG. HIGH TEMP 9.45 A DC 9.76 A DC -0.28 %/°C -0.38 %/°C 20ADC 44.3 V DC 27.4 V DC IVIII-rcvnv V tM I tK ._1rtl.ir ILA I IUrvJ enpnase I1.2�-bu-L-uJ POWER POINTTRACKING (MPPT) MIN/MAX 22 - 48 V DC MAXIMUM INPUTVOLTAGE 48 V DC MAXIMUM DC SHORT CIRCUIT CURRENT 15 A DC MAXIMUM USABLE DC INPUT POWER 350 W MAXIMUM OUTPUT CURRENT 1 AAC AC OVERCURRENT PROTECTION 20 A MAXIMUM OUTPUT POWER 240 W CEC WEIGHTED EFFICIENCY 97% AC PHUTUVULA I IC MODULE MARKING ( NEC 690.52) NOMINAL OPERATING AC VOLTAGE 240 V AC NOMINAL OPERATING AC FREQUENCY 47 - 68 HZ AC MAXIMUM AC POWER 240 VA AC MAXIMUM AC CURRENT 1.0 A AC MAXIMUM OCPD RATING FOR AC MODULE 20 A AC DESIGN LOCATION AND TEMPERATURES TEMPERATURE DATA SOURCE STATE LIM WEATHER STATION ASHRAE EXTREME LOW TEMP (°C) ASHRAE 2% AVG. HIGH TEMP (°C) ASHRAE 2% AVG. HIGH TEMP Colorado Wheat Ridge SALISBURY WICOMICO CO AP -14 33 CY'TFM FI FCTRICAI C.PFCIFICATIONS CIR 1 CIR 2 CIR 3 CIR 4 CIR 5 CIR 6 NUMBER OF MODULES PER MPPT DC POWER RATING PER CIRCUIT (STC) TOTAL MODULE NUMBER STC RATING OF ARRAY AC CURRENT @ MAX POWER POINT (IMP) MAX. CURRENT (IMP X 1.25) OCPD CURRENT RATING PER CIRCUIT MAX. COMB. ARRAY AC CURRENT (I MP) MAX. ARRAY AC POWER 11 3355 11 3355 JRISE(V) VEND(V; %VRISE IQ7-11 VRISE SEC. 1(MICRO TO JBOX) 39.6 22 MODULES 671OW DC 11.0 13.75 20 11.0 13.75 20 VRISE SEC. 2 (JBOX TO COMBINER BOX) 35 12 Cu. 1.56 22.0 5280W AC AC VOLTAGE RISE CALCULATIONS DIST (FT) COND. JRISE(V) VEND(V; %VRISE IQ7-11 VRISE SEC. 1(MICRO TO JBOX) 39.6 12 Cu. 1.76 241.76 0.73% VRISE SEC. 2 (JBOX TO COMBINER BOX) 35 12 Cu. 1.56 241.56 0.65% VRISE SEC. 3 (COMBINER BOX TO POI) 10 10 Cu. 0.56 240.56 0.23% TOTALVRISE JUNCTION BOX TO MAX. SHORT Cl RCUIT CURRRENT (ISC) = 3.87 243.87 1.61% PHOTOVOLTAIC AC DISCONNECT OUTPUT LABEL ( NEC 690.54) AC OUTPUT CURRENT 22.0 A AC NOMINAL AC VOLTAGE 240 V AC GROUNDING NOTES 1. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH [NEC 690-47] AND [NEC 250-501 THROUGH [NEC 250-601 SHALL BE PROVIDED. PER NEC, GROUNDING ELECTRODE SYSTEM OF EXISTING BUILDING MAY BE USED AND BONDED TO AT THE SERVICE ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, OR IS ONLY METALLIC WATER PIPING, A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT GROUND ROD WITH ACORN CLAMP. 2. THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL (OR INVERTER) IF SMALLER THAN #6 AWG COPPER WIRE PER NEC 250-64B. THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS AT BUSBARS WITHIN LISTED EQUIPMENT PER [NEC 250.64C.]. 3. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN #8 AWG AND NO GREATER THAN #6 AWG COPPER AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM. 4. PV SYSTEM SHALL BE GROUNDED IN ACCORDANCE TO [NEC 250.211, [NEC TABLE 250.1221, AND ALL METAL PARTS OR MODULE FRAMES ACCORDING TO [NEC 690.46]. 5. MODULE SOURCE CIRCUITS SHALL BE GROUNDED IN ACCORDANCE TO [NEC 690.42]. 6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDED CONDUCTOR TO ANOTHER MODULE. 7. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTIONS POINTS IDENTIFIED IN THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 8. ENCLOSURES SHALL BE PROPERLY PREPARED WITH REMOVAL OF PAINT/FINISH AS APPROPRIATE WHEN GROUNDING EQUIPMENT WITH TERMINATION GROUNDING LUGS. 9. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR DIRECT BURIAL. 10. GROUNDING AND BONDING CONDUCTORS SHALL BE COPPER, SOLID OR STRANDED, AND BARE WHEN EXPOSED. 11. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZE ACCORDING TO [NEC 690.45] AND BEA MINIMUM OF #10AWG WHEN NOT EXPOSED TO DAMAGE (#6AWG SHALL BE USED WHEN EXPOSED TO DAMAGE). 12. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLOR CODED GREEN (OR MARKED GREEN IF #4 AWG OR LARGER) 13. ALL CONDUIT BETWEEN THE UTILITY AC DISCONNECT AND THE POINT OF CONNECTION SHALL HAVE GROUNDED BUSHINGS AT BOTH ENDS. 14. SYSTEM GEC SIZED ACCORDING TO [NEC 690.47], [NEC TABLE 250.661, DC SYSTEM GEC SIZED ACCORDING TO [NEC 250.1661, MINIMUM #8AWG WHEN INSULATED, #6AWG WHEN EXPOSED TO DAMAGE. 15. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH 250.134 OR 250.136(A) REGARDLESS OF VOLTAGE. WIRING 8 CONDUIT NOTES 1. ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS PURPOSE AND APPROVED FOR THE SITE APPLICATIONS 2. BOLTED CONNECTION REQUIRED IN DC DISCONNECTS ON THE WHITE GROUNDED CONDUCTOR (USE POLARIS BLOCK OR NEUTRAL BAR) 3. ANY CONNECTION ABOVE LIVE PARTS MUST BE WATERTIGHT, REDUCING WASHERS DISALLOWED ABOVE LIVE PARTS, MEYERS HUBS RECOMMENDED 4. UV RESISTANT CABLE TIES(NOT ZIP TIES) USED FOR PERMANENT WIRE MANAGEMENT OFF THE ROOF SURFACE IN ACCORDANCE WITH NEC 110.2,110.3(A -B). 300.4 5. SOLADECK JUNCTION BOXES MOUNTED FLUSH W/ROOF SURFACE TO BE USED FOR WIRE MANAGEMENT AND AS FLASHED ROOF PENETRATIONS FOR INTERIOR CONDUIT RUNS. 6. ALL PV CABLES AND HOMERUN WIRES BE TYPE USE -2, AND SINGLE -CONDUCTOR CABLE LISTED AND IDENTIFIED AS PV WIRE, TYPE TC -ER, OR EQUIVALENT; ROUTED TO SOURCE CIRCUIT COMBINER BOXES AS REQUIRED 7. ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED ACCORDING TO [NEC CONDUCTOR SIZF CALCULATIONS MICROI NVERTER TO MAX. SHORT CIRCUIT CURRRENT (ISC) = 11.0 A AC JUNCTION BOX (1) MAX. CURRENT (ISC X1.25) = 13.8 A AC CONDUCTOR (TC -ER, COPPER (90°C)) = 12 AWG CO N DUCTO R RATI N G = 30A AMB. TEMP. AMP. CORRECTION = 0.96 ADJUSTED AMP.= 28.8 > 13.8 JUNCTION BOX TO MAX. SHORT Cl RCUIT CURRRENT (ISC) = 11.0 A AC JUNCTION BOX (2) MAX. CURRENT (ISC X1.25) = 13.8 A AC CONDUCTOR (UF -B, COPPER (60°C)) = 12 AWG CONDUCTOR RATING = 20 A CONDUIT FILL DERATE = 1 AMB. TEMP. AMP. CORRECTION = 0.96 ADJ USTE D AMP. = 19.2 > 13.8 JUNCTION BOX TO MAX. SHORT CIRCUITCURRRENT(ISC) = 11.0 AAC COMBINER BOX (3) MAX. CURRENT (ISC X1.25) = 13.8 A AC CONDUCTOR (UF -B, COPPER (60°C)) = 12 AWG CONDUCTOR RATING = 20 A CONDUIT FILL DERATE = 0.8 AMB. TEMP. AMP. CORRECTION = 0.96 ADJ USTE D AMP. = 15.36 > 13.8 COMBINER BOX TO INVERTER RATED AMPS = 22.0 A AC MAIN PV OCPD (15) MAX. CURRENT (RATED AMPS X1.25) = 27.5 A AC CONDUCTOR (THWN-2, COPPER (75°C TERM.)) = 10 AWG CONDUCTOR RATING = 35 A CONDUIT FILL DERATE = 1 AMB. TEMP. AMP. CORRECTION = 0.96 ADJUSTED AMP. = 33.6 > 27.5 690.81 FOR MULTIPLE CONDUCTORS 8. ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE INSTALLED AT LEAST 7/8" ABOVE THE ROOF SURFACE AND DERATED ACCORDING TO [NEC TABLE 310.15 (13)(2)(a), NEC TABLE 310.1 5(13)(3)(a),& NEC 310.15(B)(3)(c)]. 9. EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE -2, 90°C RATED, WET AND UV RESISTANT, AND UL LISTED RATED FOR 600V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT WIRE FROM SHARP EDGES 10. PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHN/THWN-2 INSULATED, 90°C RATED, WET AND UV RESISTANT, RATED FOR 600V 11. 4 -WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER VOLTAGE TO GROUND MARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE MEANS. 12. ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION 13. VOLTAGE DROP LIMITED TO 2% FOR DC CIRCUITS AND 3% FOR AC CIRCUITS 14. NEGATIVE GROUNDED SYSTEMS DC CONDUCTORS SHALL BE COLOR CODED AS FOLLOWS: DC POSITIVE- RED (OR MARKED RED), DC NEGATIVE- GREY (OR MARKED GREY) 15. POSITIVE GROUNDED SYSTEMS DC CONDUCTORS COLOR CODED: DC POSITIVE- GREY (OR MARKED GREY), DC NEGATIVE- BLACK (OR MARKED BLACK) 16. AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE A OR L1- BLACK, PHASE B OR L2- RED, PHASE C OR L3- BLUE, NEUTRAL- WHITE/GRAY USE -2 IS NOT INDOOR RATED BUT PV CABLE IS RATED THWN/THWN-2 AND MAY BE USED INSIDE " USE -2 IS AVAILABLE AS UV WHITE 11 17. RIGID CONDUIT, IF INSTALLED, (AND/OR NIPPLES) MUST HAVE A PULL BUSH VfO PROTECT WIRES. �{ e 18. IF CONDUIT DETERMINED TO BE RAN THROUGH ATTIC IN FIELD THEN CO b ' ' `LO BE EITHER EMT, FMC, OR MC CABLE IF DC CURRENT COMPLYING WITH NEC 250.118(10). DISCONNECTING MEANS SHALL COMPLY WITH 690.13 AND 690.1 19. CONDUIT RAN THROUGH ATTIC WILL BE AT LEAST 18" BELOW ROOF SUR A COMPLYING WITH NEC 230.6(4) AND SECURED NO GREATER THAN 6' APART NEC 330.30(B). BLUE RAVEN 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 W W W.BLUERAVENSOLARCO M CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 i CONTRACTOR: BRS FIELD OPS 385.498.6700 Z O Q 2 Of O LL Z W U) U Y W N_ W W W U) U DRAWING BY DIN ENGINEERING DATE November 7, 2019 PROJECT NUMBER 67828749 SHEET NAME ELEC. CALCS. PAGE NUMBER REVISION PV6 0 ELECTRIC SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION — DIRECT CURRENT MAXIMUM VOLTAGE VDC MAX CIRCUIT CURRENT AMPS j• i •• 1 RATED AC OUTPUT CURRENT A NONNAL OPERATING AC VOLTAGE V 1 DUAL POWER SUPPLY SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE LABEL FOR PV DISCONNECTING MEANS WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION. [NEC 690.13(B), NEC 705.221 LABEL2 AT EACH DC DISCONNECTING MEANS, INCLUDING THE DC DISCONNECT AT THE INVERTER. [NEC 690.53, NEC 690.13(B)] LABEL 3 AT POINT OF INTERCONNECTION, MARKED AT AC DISCONNECTING MEANS. [NEC 690.54, NEC 690.13 (B)] LABEL 4 AT POINT OF INTERCONNECTION FOR EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUTS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FORM MULTIPLE SOURCES, EACH SERVICE EQUIPMENT AND ALL ELECTRIC POWER PRODUCTION SOURCE LOCATIONS. [NEC 705.12(8)(3)] LABEL 5 PLACED ADJACENT TO THE BACK -FED BREAKER FROM THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE CONNECTION TO BUSBAR. [NEC 705.12(B)(2)(3)(b)] SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE 'OFP POSITION TO as E at SHUT DOWN PV SYSTEM''?"" AND REDUCE SHOCK HAZARD IN THE ARRAY LABEL 7 AT DIRECT-CURRENT EXPOSED RACEWAYS, CABLE TRAYS, COVERS AND ENCLOSURES OF JUNCTION BOXES, AND OTHER WIRING METHODS; SPACED AT MAXIMUM 1OFT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS, [NEC 690,31(G)(3&4)] LABEL8 FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(A)] LABEL 9 03=_ ' • • FOR PV SYSTEMS THAT ONLY SHUT DOWN • •• CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 TURN RAM SHUTDOWN SWITCH TOTIE 'OFF'POSITION FT AWAY FROM SERVICE DISCONNECTING ,0 SHUT DOWN CONDUCTORS ---- - MEANS TO WHICH THE PV SYSTEMS ARE OUTSIDE THE ARRAY CONNECTED AND SHALL INDICATE THE CONDUCTORSWnIN LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN THE ARRAY REMAIN ENERWED IN SUNLIGHT _.-.. SWITCHES IF NOT AT THE SAME LOCATION. -- [NEC 690.56(C)(1)(B)] _ LABEL 11 NO DC WIRES PRESENT SIGN LOCATED AT AC COMBINER BOX FOR ALL MICRO -INVERTER / AC MODULE RAPID SHUTDOWN TEST INSTALLS (IF APPLICABLE). NOT REQUIRED LABELING DIAGRAM FOR MICRO INV.: MAIN SERVICE PANEL ,& W_ ARNING LABEL 15 PERMANENT DIRECTORY TO BE LOCATED AT WARNINGLABEL MAIN SERVICE EQUIPMENT LOCATION IF ALL MAIN DISTRIBUTION UTILITY DISCONNECT($) ELECTRICAL POWER SOURCE DISCONNECTING POWER TO THIS BUILDING IS ALSO SUPPLIED MEANS (SOLAR ARRAY RAPID SHUTDOWN FROM A ROOF MOUNTED SOLAR ARRAY WITH A RAPID SHUTDOWN DISCONNECTING MEANS SWITCH) ARE GROUPED AND IN LINE OF SITE OF GROUPEDAND LABELED WITHIN LINE OF SITE MAIN SERVICE DISCONNECTING MEANS. AND 111 FT OF THIS LOCATION. [NEC 690.56(C) &NEC 705.101. & W_A_ RNING POWER TO THIS BUILDING IS ALSO SUPPIJED FROM ROOF MOUNTED SOLAR ARRAY. SOLAR ARRAY RAPID SHUTDOWN DISCONNECT IS LOCATED OUTSIDE NEXT TO UTILITY METER. LABEL 17 PERMANENT DIRECTORY TO BE LOCATED AT MAIN SERVICE EQUIPMENT DENOTING THE LOCATION OF THE PV RAPID SHUTDOWN SYSTEM DISCONNECTING MEANS IF SOLAR ARRAY RAPID SHUT DOWN DISCONNECT SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN SERVICE DISCONNECTING MEANS. [NEC 705.10, NEC 690.56(C)(1)] BLUE RAVEN 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 W W W.BLUERAVENSOLAR.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. AABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 EXISTING SUB PANEL PV COMBINER LABEL 6 O O (IF WHERE POINT OF SUBPANEL - �( INTERCONNECTION AC DISCONNECT IF USED TO COMBINE AC JUNCTION BOX (ONLY IF 3 OR MORE SUPPLY SOURCES TO 12 13 IS MADE) (IF REQ. / INSTALLED) PV OUTPUT CIRCUITS OR AC COMBINER BOX y 1 *A A BUSBAR) SIGN LOCATED AT LOAD CENTER IF ITO Q N THIS EQUIPMENT FED BY MULTIPLE CONTAINS 3 OR MORE POWER SOURCES. O & O OVERCURRENT DEVICES, EXCLUDING 1O O5 D O 0 SOURCES. TOTAL RATING OF ALL [NEC 705.12(B)(2)(3)(C)] ° ° ° F BREAKER USED 13 1 O O4 Y MAIN SUPPLY OVERCURRENT00 DEVICE, SHALL NOT EXCEED OR PLACARD O & O 16 0 AMPACITY OF BUSBAR. O IF BREAKER USE o� O Z T ,0 6 L � (ONLY IF PV O O O L1J LABEL 10 INTERCONNECTION Q 0 N RAPID -SHUTDOWN SIGN LOCATED AT RAPID SHUT DOWN CONSISTS OF LOA 11 N SIDE BREAKER) yL. U) SWITCH FOP, DISCONNECT SWITCH [NEC 690.56(C)(3)]. $ (n Lli LABELING DIAGRAM FOR STRING INV. / DC OPTIMIZER INV.: LL Y C MAIN SERVICE PANEL Z ` E U) PHOTOVOLTAIC PLACARD TO BE PLACED AT THE MAIN EXISTING SUB PANEL PV COMBINER INVERTER (S) — Q >_ SYSTEM CONNECTED BILLING METER PER XCEL ENERGY. O 1s (IF WHERE POINT OF SUBPANEL - C>3 C 12 IS MADE)INTERCONNECTION (C DISCONNECT PUSED OT CCOMBINE 0 n = M r) IF REQ. /INSTALLED) V OUTPUT CIRCUITS co O3 & O4 DRAWING BY LABEL 13 ° ° IF BREAKER USED 1 1O 0 0 PLACARD TO BE PLACED AT AC DIN ENGINEERING PV AC DISCONNECT DISCONNECT PER XCEL ENERGY OR n O g Oq 16 13 �a 15 OR 17 IF BREAKER USE O �` it JUNCTION BOX DATE OR PLACARD O o 3 OR COMBINER BOX November 7, 2019 (J ity � LABELING NOTES: (ONLY IF PV6 7 (ONLY IF PV O 1 D 1 PROJECT NUMBER 1. LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO INTERCONNECTION INTERCONNECTION O O e Ri DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND CONSISTS OF LOA CONSISTS OF LOA 11 '�' O O7 67828749 MAKE APPROPRIATE ADJUSTMENTS. SIDE BREAKER) SIDE BREAKER) RivisiQn 2. LABELING REQUIREMENTS BASED ON THE 2017 NATIONAL ELECTRIC CODE, OSHA STANDARD INTEGRATED DC DISCONNECT Ing SHEET NAME 19010.145, ANSI Z535. /� p 3. MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. LABELS 4. LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED [NEC 'ELECTRICAL DIAGRAMS SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS 110.21] PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON PV5 OF 3 LINE DIAGRAM. PV5 LINE DIAGRAM TO REFLECT ACTUAL 5, LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8", WHITE ON RED BACKGROUND; REFLECTIVE, REPRESENTATION OF PROPOSED SCOPE OF WORK. PACE NUMBER REvislor: AND PERMANENTLY AFFIXED [IFC 605.11.1.1] PUU 0 16 WARNINGLABEL PERMANENT DIRECTORY TO BE LOCATED AT POWER TO THIS BUILDING IS ALSO SOLAR ARRAY RAPID SHUTDOWN SWITCH DENOTING THE LOCATION OF THE SERVICE SUPPLIED FROM MAIN DISTRIBUTION EQUIPMENT LOCATION IF SOLAR ARRAY RAPID UTILITY DISCONNECT LOCATED SHUT DOWN DISCONNECT SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN SERVICE DISCONNECTING MEANS. [NEC 705.101 & W_A_ RNING POWER TO THIS BUILDING IS ALSO SUPPIJED FROM ROOF MOUNTED SOLAR ARRAY. SOLAR ARRAY RAPID SHUTDOWN DISCONNECT IS LOCATED OUTSIDE NEXT TO UTILITY METER. LABEL 17 PERMANENT DIRECTORY TO BE LOCATED AT MAIN SERVICE EQUIPMENT DENOTING THE LOCATION OF THE PV RAPID SHUTDOWN SYSTEM DISCONNECTING MEANS IF SOLAR ARRAY RAPID SHUT DOWN DISCONNECT SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN SERVICE DISCONNECTING MEANS. [NEC 705.10, NEC 690.56(C)(1)] BLUE RAVEN 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 W W W.BLUERAVENSOLAR.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. AABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 EXISTING SUB PANEL PV COMBINER LABEL 6 O O (IF WHERE POINT OF SUBPANEL - �( INTERCONNECTION AC DISCONNECT IF USED TO COMBINE AC JUNCTION BOX (ONLY IF 3 OR MORE SUPPLY SOURCES TO 12 13 IS MADE) (IF REQ. / INSTALLED) PV OUTPUT CIRCUITS OR AC COMBINER BOX y 1 *A A BUSBAR) SIGN LOCATED AT LOAD CENTER IF ITO Q N THIS EQUIPMENT FED BY MULTIPLE CONTAINS 3 OR MORE POWER SOURCES. O & O OVERCURRENT DEVICES, EXCLUDING 1O O5 D O 0 SOURCES. TOTAL RATING OF ALL [NEC 705.12(B)(2)(3)(C)] ° ° ° F BREAKER USED 13 1 O O4 Y MAIN SUPPLY OVERCURRENT00 DEVICE, SHALL NOT EXCEED OR PLACARD O & O 16 0 AMPACITY OF BUSBAR. O IF BREAKER USE o� O Z T ,0 6 L � (ONLY IF PV O O O L1J LABEL 10 INTERCONNECTION Q 0 N RAPID -SHUTDOWN SIGN LOCATED AT RAPID SHUT DOWN CONSISTS OF LOA 11 N SIDE BREAKER) yL. U) SWITCH FOP, DISCONNECT SWITCH [NEC 690.56(C)(3)]. $ (n Lli LABELING DIAGRAM FOR STRING INV. / DC OPTIMIZER INV.: LL Y C MAIN SERVICE PANEL Z ` E U) PHOTOVOLTAIC PLACARD TO BE PLACED AT THE MAIN EXISTING SUB PANEL PV COMBINER INVERTER (S) — Q >_ SYSTEM CONNECTED BILLING METER PER XCEL ENERGY. O 1s (IF WHERE POINT OF SUBPANEL - C>3 C 12 IS MADE)INTERCONNECTION (C DISCONNECT PUSED OT CCOMBINE 0 n = M r) IF REQ. /INSTALLED) V OUTPUT CIRCUITS co O3 & O4 DRAWING BY LABEL 13 ° ° IF BREAKER USED 1 1O 0 0 PLACARD TO BE PLACED AT AC DIN ENGINEERING PV AC DISCONNECT DISCONNECT PER XCEL ENERGY OR n O g Oq 16 13 �a 15 OR 17 IF BREAKER USE O �` it JUNCTION BOX DATE OR PLACARD O o 3 OR COMBINER BOX November 7, 2019 (J ity � LABELING NOTES: (ONLY IF PV6 7 (ONLY IF PV O 1 D 1 PROJECT NUMBER 1. LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO INTERCONNECTION INTERCONNECTION O O e Ri DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND CONSISTS OF LOA CONSISTS OF LOA 11 '�' O O7 67828749 MAKE APPROPRIATE ADJUSTMENTS. SIDE BREAKER) SIDE BREAKER) RivisiQn 2. LABELING REQUIREMENTS BASED ON THE 2017 NATIONAL ELECTRIC CODE, OSHA STANDARD INTEGRATED DC DISCONNECT Ing SHEET NAME 19010.145, ANSI Z535. /� p 3. MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. LABELS 4. LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED [NEC 'ELECTRICAL DIAGRAMS SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS 110.21] PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON PV5 OF 3 LINE DIAGRAM. PV5 LINE DIAGRAM TO REFLECT ACTUAL 5, LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8", WHITE ON RED BACKGROUND; REFLECTIVE, REPRESENTATION OF PROPOSED SCOPE OF WORK. PACE NUMBER REvislor: AND PERMANENTLY AFFIXED [IFC 605.11.1.1] PUU 0 Enphase Microinyer-tens Enphase IQ 7 and To learn more about Enphase offerings, visit enphalsexo m The high-powered smart grid -ready Enphase IQ T Micro— and Enphase {r) 7+ Micrta— dramatically simplify the installation process while achieving the highest system efficiency. Part of the Enphase IQ System, the IQ 7 and IQ 7=r Microinverters integrate with the Enphase IQ Envoy", Enphase IQ Battery—, ar-: -e Er•phase Enlighten— mon: Loring and anaiy _ r.:_'tware. IQ Series Microinverters e)ctend the re ability standards set forth by previous generat3 ns and undergo over a million hours of power -on testing, enabling Enphase to provide an industry-leading warranty of up to 25 years - Easy to Install Ughtweight and Simple Faster instal�at=olnwithimproved.'lighter t-wireoabkng Bush -in rapid shurtdawn compliant (NEC, 2014 & 2017) optimized for h gh powered 60-cs--,1 and 72-ce:1* modules Marethan a rrilkcir, hours of testing Ciass 11 double -insulated enclosure UL listed Smart Grid Ready Complies with advanced grid support, voltage and frequency ride -through requirernents Remotely updates to respond to changing grid requirements • Configurable for varying grid profiles Meets CA Rule 21 (UL 1741 -SA) --he 1Q 7} M'rcao tt seq aired to support 72 -cell modules NW BLUE RAVEN Ambient temperature range -40°C to +65°C 1403 N RESEARCH WAY. BUILDING J Enphase IQ 7 and IQ 7+ Microinverters 4 ,. to 1009; (condensing) OREM,UT84097 800-377-4480 WWW. BLUERAVENSOLAR.COM INPUT DATA (DC) I07 -60 -2 -US / IQ7-60-B-US IQ7PLUS-72-2-US! IQ7PLUS-72-B-US _ _ Commonly used module pairings` 235 tN- 350 LV + 235 W - 440 W + Module compatibility 60 -cell PV modules only 60 -cell and 72 -cell PV modules CONFIDENTIAL - THE INFORMATION Maximum input DC voltage 48 V 60V HEREIN CONTAINED SHALL NOT BE PV2 to MC4: order ECA -S20 -S22 USED FOR THE BENEFIT OF Peak ower tracking voltage P g 9 27 V -37 V 27 V - 45 V V ANYONE EXCEPT BLUE RAVEN Operating range 16 V - 48 V 16 V - 60 V SOLAR NOR SHALL IT BE Min/Max start voltage 22 V ! 48 V 22 V /60 V DISCLOSED IN WHOLE OR IN PART Max DC short circuit current (module Ise) 15A 15A TO OTHERS OUTSIDE RECIPIENTS Approved for wet locations Yes ORGANIZATION, EXCEPT IN Overvoltage class DC port II II CONNECTION WITH THE SALE AND DC port backfeed current 0 A 0 A USE OF THE RESPECTIVE PV array configuration 1 x 1 ungrounded array; No additional DC side protection required; EQUIPMENT, WITHOUT THE AC side protection requires max 20A per branch circuit WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. OUTPUT DATA (AC) IQ 7 Microinverter IQ 7+ Microinverter Power Line Communication (PLC) Peak output power 250 VA 295 VA Maximum continuous output pourer 240 VA 290 VA NABCEP Nominal (L -L) voltage/rang e2 240V/ 208V/ 240 V 1 208 V/ 211-264 V 183-229 V 211-264 V 183.229 V C E RT I F I E D Maximum continuous output current 1.0 A (240 V) 1.15 A (208 V) 1.21 A (240 V) 1.39 A(208 V) PV INSTALLATION Nominal frequency 60 Hz 60 Hz Extended frequency range 47 - 68 Hz 47 - 68 Hz PROFESSIONAL AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Scott Gurney Maximum units per 20 A (L -L) branch circuit' 16 (240 VAC) 13 (208 VAC) 13 (240 VAC) 11 (208 VAC) # PV -011719-015866 CONTRACTOR: Overvoltage class AC port III III AC port backfeed current 0 A 0 A BRS FIELD OPS Power factor setting 1.0 1.0 and DC conductors, when installed according manufacturer's instructions. 385.498.6700 Power factor (adjustable) 0.7 leading ... 0.7 lagging 0.7 leading ... 0 7 lagging t id9e EFFICIENCY @240 V @208 V @240 V @208 V Wh Peak CEC efficiency � � � 97.6% 976% 97.5% � 97.3% ai haps Nenphase comrcn us/suppoillin odule-comaiibTly. CKweighted efficiency 970 ` 97,0 % 97.0's�, 970 h anal �f rr qu reciby1he trta`t,. j"or MECHANICAL DATA Ambient temperature range -40°C to +65°C Relative humidity range 4 ,. to 1009; (condensing) Connector type (IQ7-60-2-US& IQ7PLUS-72-2-US) MC4 (or Amphenol H4 UTX with additional Q -DCC -5 adapter) Connector type (IQ7-60-6-US & IQ7PLUS-72-8-US) Friends PV2 (MC4 intermateable). Adaptors for modules with MCA or UTX connectors. PV2 to MC4: order ECA -S20 -S22 PV2 to UTX: order ECA -S20 -S25 Dimensions (WxHxD) 212 mm x 175 mm x 30.2 mm (without bracket) Weight 1.08 kg (2.38 lbs) Cooling Natural convection - No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double -insulated, corrosion resistant polymeric enclosure Environmental category i UV exposure rating NEMA Type 6 %outdoor FEATURES Communication Power Line Communication (PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load -break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741 -SA) UL 62109-1, UL1741r'IEEE1547, FCC Part 15 Class B, ICES -0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC -2014 and NEC -2017 section 690.12 and C221-2015 Rule 64-218 Rapid Shutdown of PV SysteptjyfbJAC LL.• and DC conductors, when installed according manufacturer's instructions. t id9e Wh 1, No cnlorceci CC'.4C rano. Seeihe compai,.b+iy calculeior ai haps Nenphase comrcn us/suppoillin odule-comaiibTly. 2 Nominal opaye ranLae can be esicnded beyond nor anal �f rr qu reciby1he trta`t,. j"or .r �+is r;ay ; an'. Refer to local requires -rents ro deine the number of r'oroinverters per branch n yom area. 1�Cijt�9 u SHEET NAME To learn more about Enphase offerings, visit enphase.com E ASE. SPEC SHEET ,C;g_r)ti7.1 PAGE NUMBER R EVISION SS 0 Enphase Networking Combiner U� LISTED To learn more about Enphase offerings, visit enphase.cOm The Enphase 10 Combiner 3"' w-th Enphase IQ Envoy-" conso: dates nterconnect:on equipment nto a s ng e en&osure and stream' nes PV and storage insta' at ons by prop; d ng a cons stent, pre -vv red so'ut on 'or res'dentla app cat ons. It o`'ers up to -our 2 po'e 'nput c rcu'ts and Eaton BR ser es bulbar asserribly. Smart Includes IQ Envoy for communication and control Flexible networking supports WI-Fi, Ethernet, or cellular Optional AC receptacle available for PLC bridge Provides production metering and optional consumption monitoring Simple Reduced size from previous combiner Centered mounting brackets support single stud mounting Supports back and side conduit entry Up to four 2 -pole branch circuits for 240 VAC plug-in breakers (not included) BO A total PV or storage branch circuits Reliable Durable NRTL-certified NEMA type 3R enclosure Five-year warranty UL listed ,� ENPHASE. *'11�1 RAVENi Enphase IQ Combiner 3 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 MODEL NUMBER IQ Combiner 3 X-IQ-AN41-240-3 IQ Combiner 3 with Enphase IQ Envoy" printed circuit board for integrated revenue grade PV 800-377-4480 production metering (ANSI C12.20 +,-0.5%) and optional* consumption monitoring (+/-2.5":-). WVvW.BLUERAVENSOLAR.COM ACCESSORIES and REPLACEMENT PARTS {not included, order separately) -- --- — -- - — -- - -- — -- CONFIDENTIAL - THE INFORMATION Enphase Mobile Coect'nn HEREIN CONTAINED SHALL NOT BE CELLMODEM-03 (4G / 12 -year data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 USED FOR THE BENEFIT OF CELLMODEM-01 (3G i 5 -year data plan) microinverters. (Available in the US, Canada, Mexico, Puerto Rico, and the US Virgin Islands, ANYONE EXCEPT BLUE RAVEN CELLMODEM-M1 (4G based LTE -M f 5 -year data plan) where there is adequate cellular service in the installation area.) SOLAR NOR SHALL IT BE Consumption Monitoring* CT DISCLOSED IN WHOLE OR IN PART CT -200 -SPLIT Split core current transformers enable whole home consumption metering (+/- 2.54::). TO OTHERS OUTSIDE RECIPIENTS Circuit Breakers Supports Eaton BR210, BR215, BR220, BR230. BR240, BR250, and BR260 circuit breakers. ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND BRK-10A-2-240 Circuit breaker, 2 pole, 10A, Eaton BR210 USE OF THE RESPECTIVE BRK 15A-2-240 Circuit breaker, 2 pole, 15A, Eaton B R215 EQUIPMENT, WITHOUT THE BRK-20A-2P-240 Circuit breaker, 2 pole, 20A, Eaton BR220 WRITTEN PERMISSION OF BLUE EPLC-01 Power line carrier (communication bridge pair), quantity 2 RAVEN SOLAR LLC. XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3 (required for EPLC-01) XA-ENV-PCBA-3 Replacement IQ Envoy printed circuit board (PCB) for Combiner 3 ELECTRICAL SPECIFICATIONS C E R T I F I E D Rating Continuous duty _ System voltage 120/240 VAC, 60 Hz PV INSTALLATION Eaton BR series busbar rating 125 A PROFESSIONAL Scott Gurney Max. continuous current rating (output to grid) 65A # PV -01 1 71 9-01 5866 Max fusetcircuit rating (output) 90A CONTRACTOR: Branch circuits (solar andlor storage) Up to four 2 -pole Eaton BR series Distributed Generation (DG) breakers only (not Included) BRS FIELD OPS Max. continuous current rating (input from PV) 64A 385.498.6700 Max. total branch circuit breaker rating (input) 80A of distributed generation / 90A with IQ Envoy breaker included Production Metering CT 200 A solid core pre-installed and wired to IQ Envoy MECHANICAL DATA Dimensions (WxHxD) 49.5 x 37.5 x 16.8 cm 09.5° x 14.75" x 6.63') Height is 21,06'k'53 5 crn with mounting brackets) Weight 7.5 kg (16.5 Ibs) Ambient temperature range -40° C to +46° C (-400 to 115° F) Cooling Natural convection, plus heat shield Enclosure environmental rating Outdoor, NRTL-certified, NEMA type 3R, polycarbonate construction Wire sizes 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors 60 A breaker branch input: 4 to 1/0 AWG copper conductors Main lug combined output: 10 to 2/0 AWG copper conductors Neutral and ground: 14 to 1 /0 copper conductors Always follow local code requirements for conductor sizing. Altitude To 2000 meters (6,560 feet) INTERNET CONNECTION OPTIONS Integrated Wi-Fi 802.11b!g/n Ethernet Optional, 802.3, Cat5E (or Cat 6) UTP Ethernet cable (not included) Cellular Optional, CELLMODEM-01 (3G) or CELLMODEM-03 (4G) or CELLMODEM-M1 (4G based LTE -M) (not included) COMPLIANCE Compliance, Combiner UL 1741 CAN; CSA C22.2 No. 107.1 47 CFR, Part 15, Class B. ICES 003 Production metering: ANSI C12.20 accuracy class 0.5 (PV production) Compliance, IQ Envoy UL 60601-1/CANCSA 22.2 No 61010-1 * Consumption monitoring is required for Enphase Storage Systems jtC,* % To learn more about Enphase offerings visit enphase cam ® ENP 3 tStOl SHEET NAME SPEC SHEET PAGE NUMBER BENISON SS 0 Safety Resistance to sah mist caresion at your request Anti -P ID products using advanced module technology Performance High efficiency and enhanced module durability Resistance to ammonia corrosion at your request n L Wald 1 st company to pass 'Thresher Test' and `On-site Power Measurement Validation' certificate .O Outstanding power output capability at law irradiance 4w,4jd g � �a.28h. a� VaA•° e. omsav vu^•�M � _aa aan 1 Guarantee on product 0 material and workm ansttp YEARS 25 Linea power output warranty YEARS (V i� Product is certified by UL1703 a ` Bankabre piOducts Withstand up to 240OPa wind and 5400Pa snow loads{IEC). long lasting f✓��lE� 1��'�`r SERAPHIM ENEFLGY GROUP 295-31QwPERC MANAGEMENT SYSTEM ISO 9001: Quality management system ISO 14001. Standard for environmental management system OH SAS 18001: International standard for occupational health and safety assessment system CGOU6 INSURANCE S E I A h+ar Arz Speaimtions are subiect to change without notification SEGDS-EN-2019V 7.1 !)Copyright 2019 Seraphim SEG -6M B-xxx B B SERIES 6 INCH 60 CELLS or. BB BLACK BAC K•91EEr 1BLArK FRAME PROOUCT5 Electrical Characteristics(STC) Electrical Char act eristics(NOCT) • ac x 'a' ax tit.SYea•+.cit:SrIrNI;#:1lfFiiSc=Y.A�.�riirGt�t• Maximum Powe at STC -F i1M : 295 300 305 310 Open Circuit Voltage -V,, (V) 39.5 39.7 39.9 40.2 Short Circuit Current -I,. (A) 9.56 9.65 9.76 9.82 Maxim um Power V olage-V,. (V) 31.9 321 32.3 326 Maximum Power Current -Ina iA) 9.25 9.35 9.45 9.51 Module Efficiency STC -q„ t%) 18.13 18.44 18.75 1905 Power Tolerance r Wi 10.+4.99) Maximum System Voltage fV} 1000or 15MUL) Maximum Series Fuse Rating iA) 20 Fire Performance Type2 or TypetiUL) Electrical Char act eristics(NOCT) Temperature Characteristics Pmax Temperature Coefloem-0.38%1'C Voc Temperature Coefiaent -0 26 %r'C Isc Temperature Coefficient +0.05 WIC Operating Temperature -40--85'C Nominal Operating Ceti Temperature iNOCT) 45±2C Packing Configuration Container 20'GP 40GP Pieces per Pallet 30 30 patters per Container 12 28 Reces per Contaner 360 840 Mechanical Specifications 1643 99 x35mm.6457x1s0]xl 37,nm5 175 K938 5 b MmaryetaMe 6intra Bor.1 y 2mm AR -t; tempered glass. Iau am Anod.ed aumrlum >iby IP67 12AVYCs,caLb hengarhmQ; mm MG C -paid. STC. imadiance 1000 Wrm•, module temperature 25`C. AW 1.5 NOCT. Imadiance am Whn7. ambient temperature 20'C. wind speed Amfs Speaficaions are subject to change without further notification. 7C, 70 I II Si 21 Section A -A lei All Dimensions in mm The aboK drawing is a graphmat representation of the product I-V Curve c a +onc wm� 10 C ...� =° ro r Speaications are subject tochange without notification SEG-DS-EN-20lgVl_1 C'TopyrgV2019 Seraphim `1�1 BLUE 2AVEF1 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW. BLU ERAVE NSOLAR. COM CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 i�PHIM ENERGY GROUP, INC. SHEET NAME SPEC SHEET PAGE NUMBER JREVISION SS 0 r�eelsesn�W,�yxeew=:� Maximum Power at NOCT-P„,{W) 219 223 226 230 open Croud Voltage-V,x iV) 36.5 36.7 36-8 37.1 Shon CircuitCument -I tA) 7.73 732 7-91 7 96. Maximum Power Voltage-V,N(V) 301 30.3 30.4 30-7 Maximum Power Current -I, iA) 7.28 736 7.44 7,50 Temperature Characteristics Pmax Temperature Coefloem-0.38%1'C Voc Temperature Coefiaent -0 26 %r'C Isc Temperature Coefficient +0.05 WIC Operating Temperature -40--85'C Nominal Operating Ceti Temperature iNOCT) 45±2C Packing Configuration Container 20'GP 40GP Pieces per Pallet 30 30 patters per Container 12 28 Reces per Contaner 360 840 Mechanical Specifications 1643 99 x35mm.6457x1s0]xl 37,nm5 175 K938 5 b MmaryetaMe 6intra Bor.1 y 2mm AR -t; tempered glass. Iau am Anod.ed aumrlum >iby IP67 12AVYCs,caLb hengarhmQ; mm MG C -paid. STC. imadiance 1000 Wrm•, module temperature 25`C. AW 1.5 NOCT. Imadiance am Whn7. ambient temperature 20'C. wind speed Amfs Speaficaions are subject to change without further notification. 7C, 70 I II Si 21 Section A -A lei All Dimensions in mm The aboK drawing is a graphmat representation of the product I-V Curve c a +onc wm� 10 C ...� =° ro r Speaications are subject tochange without notification SEG-DS-EN-20lgVl_1 C'TopyrgV2019 Seraphim `1�1 BLUE 2AVEF1 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW. BLU ERAVE NSOLAR. COM CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 i�PHIM ENERGY GROUP, INC. SHEET NAME SPEC SHEET PAGE NUMBER JREVISION SS 0 sl_' IaDeek FLASHED FV ROOF -MOUNT COMBINER/'ENCLOSURE Basic Features • Stamped Seamless Construction • 18 Gauge Galvanized Steel • Powder Coated Surfaces • Flashes into the roof deck • 3 Roof deck knockouts .5", .75", 1" • 5 Centering dimples for entry/exit fittings or conduit • 2 Position Ground lug installed • Mounting Hardware Included **Fuse holders and terminal blocks added in the field must be UL listed or recognized and meet 600 VDC 30 AMP 110C for fuse holders, 600V 50 AMP 90C for rail mounted terminal blocks and 600 V 175 AMP 90C for Power Distribution Blocks. Use Copper Wire Conductors. SolaDeck Model SD 0783 SolaDeck UL50 Type 3R Enclosures Available Models: Model SD 0783 - (3" fixed Din Rail) Model SD 0786 - (6" slotted Din Rail) SolaDeck UL 1741 Combiner/Enclosures Models SD 0783-41 and SD 0786-41 are labeled and ETL listed UL STD 1741 according to the UL STD 1741 for photovoltaic combiner enclosures. Max Rated - 60OVDC, 120AMPS Model SD 0783-41 3" Fixed Din Rail fastened using Norlock System **Typical System Configuration 4- Din Rail Mounted Fuse Holders 60OVDC 30 AMP 1- Power Distribution Block 60OVDC 175AMP 1- Bus Bar with UL lug Model SD 0786-41 6" Slotted Din Rail fastened using steel studs **Typical System Configuration 4- Din Rail Mounted Fuse Holders 60OVDC 30 AMP 4- Din Rail Mounted Terminal Blocks Bus Bars with UL lug conduit or fittings, base is center dimpled for fitting locations. Model SD 0783-41, wired with Model SD 0786-41, wired with Din Rail mounted fuse holders. Din Rail mounted fuse holders, bus bar and power distribution terminal blocks and bus bars. block. RSTC Enterprises, Inc . 2219 Heimstead Road . Eau Cliare, WI 54703 For product information call 1(866) 367-7782 BLUE RAVEN 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 W W W.BLUERAVENSOLAR.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR BRS FIELD OPS 385.498.6700 Ridge IDMSs1on SHEET NAME SPEC SHEET PAGE NUMBER REVISION SS 0 i SYSTEM BONDING & GROUNDING P A G E TM �IST so SFM MICRORAIL l p, ll ism JEESL G a;,t g, te Single Use Oniy q* TERt It L TOR UE, It)Slall C0€101 LtOr and torque to the ft ltto inq� 6-14 AM. 7ft4bs LUG DETAIL & TORQUE l E '.UG DETAIL TORQUE INFO LUG DETAIL & TORQUE INFO ILsco Lay -In Lug (GBL-4DBT) Rsco Flange Lug(SGB-4) W1LeyWEEBLug (6.7) • 10-32 mounting hardware a 1/4" mounting hardware • 1/4" mounting hardware • Torque = 5 ft -lb # Torque= 75 in -lb 0 Torque =10 ft -lb • AWG 4 -14 -Solid or Stranded • AWG 4-14 -Solid or Stranded 41 AWG6-14-SoLidorStranded NOTE: ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION System bonding is accomplished through modules. System grounding accomplished by attaching a ground lug to any module at a location on the module specified by the module manufacturer. E -W BONDING PATH: E -W module to module bonding is accomplished with 2 pre-installed bonding pins which engage on the secure side of the MicrorailTM and splice. N -S BONDING PATH: N -S module to module bonding is accomplished with bonding clamp with 2 integral bonding pins. frefer also to alternate method 00 >. TRIMRAIL BONDING PATH: Trimrail to module bonding is accomplished with bonding clamp with integral bonding pin and bonding T-boLt. Nor - BLUE RAVEN 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW BLUERAVENSOLAR COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION. EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED P\ _INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 o` Ih t Rt trig pI'S�' SHEET NAME u SPEC SHEET PAGE NUMBER REVISIpN SS 0 Intertek AUTHORIZATION TO MARK Total Quality. Assured. This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple iistee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. Applicant: Unirac, Inc Manufacturer: Cixi Emeka Aluminum Co. Ltd Party Authorized To Apply Mark: Same as Manufacturer Report Issuing Office: Lake Forest, CA U.S.A. TL—wj-�- Control Number: 5003705 Authorized by: T4:�=' for Dean Davidson, Certificati 2rManager US Qsmv Intertek This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for Me exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Inlenek and its Client. Inlertek's responsibility and liability are limited to the terms and condi0ons of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement. for any loss, expense or damage occasioned by the use of this Authonzabon to Mark. Only the Client is authorized to perrmt copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek's Certification nnI is restncled to the conditions laid out in the agreement and in this Authorization to Mark Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must first he approved In writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification nI in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights. IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 1411 Broadway Blvd NE Standard(s): No. 688 ChaoSheng Road Address: Albuquerque, NM 87102 Address: Cixi City Brand Name: Unirac Models: Zhejiang Province 315311 Country: USA Country: China Klaus Nicolaedis Jia Liu Contact: Tom Young Contact: Robin Luo 505-462-2190 +86-15267030962 Phone: 505-843-1418 Phone: +86-13621785753 FAX: NA FAX: NA klaus.nicolaedis@unirac.com jiuwan.luoC@cxym Email: toddg@unirac.com Email: buwan.luo@cxymj.com Party Authorized To Apply Mark: Same as Manufacturer Report Issuing Office: Lake Forest, CA U.S.A. TL—wj-�- Control Number: 5003705 Authorized by: T4:�=' for Dean Davidson, Certificati 2rManager US Qsmv Intertek This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for Me exclusive use of Intertek's Client and is provided pursuant to the Certification agreement between Inlenek and its Client. Inlertek's responsibility and liability are limited to the terms and condi0ons of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement. for any loss, expense or damage occasioned by the use of this Authonzabon to Mark. Only the Client is authorized to perrmt copying or distribution of this Authorization to Mark and then only in its entirety. Use of Intertek's Certification nnI is restncled to the conditions laid out in the agreement and in this Authorization to Mark Any further use of the Intertek name for the sale or advertisement of the tested material, product or service must first he approved In writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification nI in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights. IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 ATM for Report 102393982LAX-002 Page Iof1 ATM Issued: 9 -Apr -2019 ED 16.315 (20 -Apr -17) Mandatory *14�1* BLUE RAVEN 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WW W.BLUERAVENSOLAR.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT. WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 SHEET NAME SPEC SHEET PAGE NUMBER REVISION SS 0 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat - Standard(s): Plate Photovoltaic Modules and Panels [UL 2703: 2015 Ed. 1] Photovoltaic Mounting System, Sun Frame Microrail - Installed Using Unirac Installation Guide, Rev Product: PUB2019MAR01 with Annex North Row Extension Installation Guide Rev PUB2019FEB20 Brand Name: Unirac Models: Unirac SFM ATM for Report 102393982LAX-002 Page Iof1 ATM Issued: 9 -Apr -2019 ED 16.315 (20 -Apr -17) Mandatory *14�1* BLUE RAVEN 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WW W.BLUERAVENSOLAR.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT. WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 SHEET NAME SPEC SHEET PAGE NUMBER REVISION SS 0 FLASHING & SLIDERS man �J" rlit R Lt" t! U 10�� [Jil U SFMI� PAGE --------------- ----------- -------------------------------------------------------------------------------------------------- PILOT HOLES: Drill pilot holes for tag screws or structural screws (as necessary) at marked attachement points FLASHINGS: Place flashings INSTALL SLIDERS AND TRIMRAIL ROOF ATTACHMENTS: • Insert flashings per manufacturer instructions • Attach sliders to rafters • Verify proper row to row spacing for module size (Mod NS + 1') • Ensure that Trimrai ITM roof attachments in each row have sufficient engagement with slider dovetails for proper attachment. INSTALL SLIDERS AND ROOF ATTACHMENTS: Follow manufacturer instructions forflashing installation procedures MASON R, NIOT EN-5 rnoduAe edge is with -In I ' of thi�- !;hingle course above, you have the option to p vot / tol ate I ider at the attachment point -ID , spirt the nv#i tourse and cut shingle' m icquired- as Reqwied r - - - -4, - - - - - - - - - li 0 Ii ii � Nor - BLUE RAVEN 1403 IN RESEARCH WAY. BUILDING J OREM, UT 84097 800-377-4480 WWW BLUERAVENSOLAR COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR �NPART TO OTHERS OUTSIDE RECIPIENTS ENTS ORGANIZATION, EXCEPTIN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV P\j JW§fAffkf(ON PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 SHEET NAME SPEC SHEET PAGE NUMBER P Evis� & Dan Schultz From: no- reply@ci.wheatridg us Sent: Wednesday, July 12, 17 2:58 PM To: Permits CommDev Subject: Online Form Submi a tial Roofing Permit Application Categories: Danny t Residential Roofing P.'_r'hw't A ica ion This application is exclusively r 077FAwnits for residential roofs and for licensed contractors only. This type of p it NLY being processed online --do not come to City Hall to submit an applicati in person. Permits are processed and issued in the order they are received and d to the volume of requests, time to process varies and is subject to e. Y WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PIC D WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO L THE TRANSACTION. You will be notified if your contractor's license r insu ce has expired, and you may update those documents at the time yo re iss d your permit. other requests: NJ Homeo ers wishing t obta a)ision fing permit must apply for the permit in person qty H II. Revisions t xi ingrmits (for example, to add redecking) must be comp et din person at Ci all.other non -roofing permits must be completed in person t City Hall. ui will be open from 7:30-10:30 a.m., Mo through Frida cess these types of requests. APPLICATION D S CONSTITUTE A PERMIT. DO NOT BEGIN R OFING UNIILPER HAS BEEN ISSUED. Is this application es idential ro many d s Single Family Home are on the property? OPERTY INFORMATION Property Property Property ^Or Phone Number Address 3636 Ames St Heather Kraft 3035205720 hunnybus77.HK@gmail.com VAJW6'x� X / 1 q 1 C .k L. r-1 u 11 � jM V\) 'n 6-n p e"t ^,Jt� Do you have a signed Yes contract to reroof this property? It will need to be provided at the time of permit pick-up. CONTRACTOR INFORMATION Contractor Name Diligent Roofing Contractor's License --� Number (for the City of Wheat Ridge) Contractor Phone 3035689896 Number Contractor Email Address Diligentroof@yahoos%rn 4. ` Retype Contractor Email diligentroof@yahoo.com Address DESCRIPTION OF WORK Are you re -decking the No " roof? Description of Roofing 4 GAF Mission Brown 30 Year Material Select Type of Material: Asphalt If "Other" is selected Field not completed. above, describe here: How many squares of the 13.65 material selected above? Does any portion of the No property include a flat roof? If yes, how many squares Field not completed. on the flat roof? TOTAL SQUARES of all 13.65 V " roofing material for this proj ect e� Provide additional detail Remove and replace shingles on a house, etch 5.12 here on the description of i work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract value or cost of ALL materials and labor) $3,753.75 SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant Fredis Diaz Email not displaying correctly? View it in your browser. 3 i CITY OF WHEAT RIDGE _1�9rBuilding Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: ql)q i4 F Job Address: 3631G AM105 _51, - Permit 1`'Permit Number: 901708 71>'6'- ❑ No one available for inspection: Time AM/PM Re -Inspection required: Yes No When corrections have been made, call for re -inspection at 303-234-5933 Date: f G1 % Inspector: M��� DO NOT REMOVE THIS NOTICE INSPECTION RECORD )n online form: http:/hdvww.ci.wheattridge.co.us/ir?zpection �,ar :s ml..,t be submitted via the online form before 8 a.m. the day of the inspection Inspections will not be performed unless this card is posted on the project site Request an inspection before MIDNIGHT (11:59 PM) to receive an inspection the following business day PERMIT: ' ADDRESS: JOB CODE: Foundation Inspections Date Inspector Initials Comments 102 Caissons / Piers -� 103 Footing / P.E. Letter 303 Roof Sheathing 104 Foundation Setback Cert. - - 105 Stem Walls 204 Plumbing Underground Int. 106 Foundation wall Insulation 205 Plumbing Underground Ext. uV iycse F-VU1 %0V11U1 VLe rnur i v Hpprovai ur I ne ADove Inspections Underground / Slab Inspections 9 p Date Inspector Initials Comments 201 Electrical / Cable/ Conduit -� 202 Sewer Underground Int. 303 Roof Sheathing 203 Sewer Underground Ext. - - 204 Plumbing Underground Int. , 205 Plumbing Underground Ext. y 206 Water Underground %P ....VCI w1muluivunu ur Deiow i In-alao vvorK rnor 10 Approval Of The Above Inspections Rough Inspection Date Inspector Initials Comments 301 Rough Framing f 302 Wall Sheathing 303 Roof Sheathing 304 Sheer Inspection 305 Insulation , 306 Mid -Roof y 307 Metal / Lath / Stucco 308 Rough Electrical Residential = 309 Rough Electrical Commercial 310 Electrical Meter Residential 311 Electrical Meter Commercial 312 Temp. Const. Meter 313 Rough Plumbing Residential 314 Rough Plumbing Commercial 315 Shower Pan SEE OVER FOR ADDITIONAL INSPECTIONS J0 / -�- o �(7 167 �.� ADDRESS: -juah Inspection (continued) I Date I Inspector JOB CODE: Comments 316 Rough Mechanical Residential Date Inspector CommentsInitials 317 Rough Mechanical Commercial 318 Boiler / Furnace 319 Hot water tank 320 Drywall screw and Nail 321 Moisture board / shower walls 322 R, ugh Grading 323 Miscellaneous Final Inspections Date Inspector CommentsInitials 402 Gas Meter Release 403 Final Electrical Residential 404 Final Electrical Commercial 405 Final Mechanical Residential 1406 1-! ?„echanical Commercial 1407 Fin,}! Plumbing Residential 408 Final Plumbing Commercial 409 Final Roof 410 Final WindowlDoor 411 Landscape ,' 3,rk/Planning* Inspections from these entities shall be requested one week in advance. *For landscaping and parking inspections please call 303-235-2846 **For ROW and drainage inspections please call 303-235-2861 ***For fire inspections please contact the Fire Protection District for your project. +12 Rcw/Drainage/Public Works** 413 Flood plain Inspet;on** �,_ _. ,14 Fire Insp. / Fire Protection*** 415 Public Works Final** 416 Storm Water Mgmt.** 417 Zoning Final Inspection* 418 Building Final Inspection Note: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. App ,oval of the Final Building Inspection does not constitute authorization of occupancy. For Low Voltage permits please be sure that rough inspections are completed by the Fire District and Electrical low voltage by the Building Division. A i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspectio line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE C� Inspection Type: '/0 ( RO F Job Address: 3 636 4 mC5 Permit Number: ?01700-7116- Ll 01 407t/ ❑ No one available for inspection, Time/ AM/PM Re -Inspection required: Yes (Np- *When corrections have been made, call for re -inspection at 303-234-5933 Date: / /17_lnspector: /w-ff DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE _:�9�Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 1-109- l— ") I o, i Job Address: -3 (. 3 io 'A' n t -e S S 4L Permit Number: '2 o 1 7 oy-7 -/ S PC, c -r C'0 y e re-, d i ro S n C cad . Un a.1, /e -%v C n d v e- 4 s n< Vie— -L o A o Or,c,i n1/G� toh Cc+r.�S ❑ No one available for inspection: Time 9 = 31 AM/ M Re -Inspection required: Yes No When corrections ha a been made, call for re -inspection at 303-234-5933 Date: ►a )'-1 /--:/ Inspector: - DO NOT REMOVE THIS NOTICE City of Wheat Ridge Residential Roofing PERMIT - 201708745 PERMIT NO: 201708745 ISSUED: 10/31/2017 JOB ADDRESS: 3636 Ames ST EXPIRES: 10;31/2018 JOB DESCRIPTION: Residential Re -roof to install GAF asphalt shingles with ROOF DECKING - 15.5 sq (14 sq pitched / 1.5 sq flat) Pitch = 5/12 *** CONTACTS *** OWNER (303)422-3799 KRAFT HEATHER K SUB (303)484-9854 Dylan Lucas, Ryan Nichols 120088 Eco Roof and Solar *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 5,194.44 FEES Total Valuation 0.00 Use Tax 109.08 Permit Fee 140.90 ** TOTAL ** 249.98 *** COMMENTS *** *** CONDITIONS *** Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be required for both the midroof and final inspections. The 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec. R806. The installation of ridge venting requires the installation or existence of soffit venting. For calculation purposes, one hat or turtle vent equal to one-half of one square foot of opening. Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. ► A , City of Wheat Ridge � r Residential Roofing PERMIT - 201708745 PERMIT NO: 201708745 ISSUED: 10/31/2017 JOB ADDRESS: 3636 Ames ST EXPIRES: 10/31/2018 JOB DESCRIPTION: Residential Re -roof to install GAF asphalt shingles with ROOF DECKING 15.5 sq (14 sq pitched / 1.5 sq flat) Pitch = 5/12 I by my signature do hereby attest that the work to be performed shall comply with all accompanyingg approved plans and specifications; applicable building codes, and all applicable municipal codes, policies and procedures, and that I am t11e legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this ermrt. l further attest that I am legally authorized to include all entities named within this document as partes to the work to be p r need and that all w rk to be perfo ed is disclosed in this document nd/or its' accompanying approved plans and specifications. Signature df OWNER or CONTRACTOR (Circle one) Datd' ' 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, po icies and procedures. 2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Budding Official and may be subject to a fee equal to one-half of the original ermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4, No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official T-� Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Dane Lovett 76)1 M 7 4.5' From: no-reply@ci.wheatridge.co.us Sent: Tuesday, October 31, 2017 7:22 AM \ To: CommDev Permits v Subject: Online Form Submittal: Residential Roofing Permit Application Follow Up Flag: Follow up c• o Flag Status: Completed"�`� THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION i} L- - - Property Address 3636 Ames St Property Owner Name Heather Kraft Property Owner Phone 303-422-3799 Number (enter WITH dashes, eg 303-123-4567) 17 $ZqqJqf Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., "e Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION i} L- - - Property Address 3636 Ames St Property Owner Name Heather Kraft Property Owner Phone 303-422-3799 Number (enter WITH dashes, eg 303-123-4567) 17 $ZqqJqf Property Owner Email Field not completed. Address Do you have a signed Yes contract to reroof this property? Applications cannot be submitted without an executed contract attached below. Attach Copy of Executed Kraft Contract.pdf Contract CONTRACTOR INFORMATION Contractor Business Eco Roof and Solar Name i Project Value (contract i ` L Contractor's License 120088 Number (This is a 5 or 6 digit number for the City Yes/, of Wheat Ridge) Contractor Phone 303-484-9854 Number (enter WITH dashes, eg 303-123-4567) Contractor Address 610 S Lipan St (Primary address of your business) Contractor Email Address mharrell@ecoroofandsolar.com Retype Contractor Email mharrell@ecoroofandsolar.com Address DESCRIPTION OF WORK TOTAL SQUARES of 15.5 the entire scope of work: i Project Value (contract _ value or cost of ALL materials and labor) Are you re -decking the Yes/, roof? Is the permit for a flat Flat roof (less than 2:12 pitch), Pitched roof (2:12 pitch or roof, pitched roof, or greater) 18 both? (check all that apply) What is the pitch of the 1/12 FLAT roof? How many squares are 1.5 part of the FLAT roof? Describe the roofing Mule Hide material for the FLAT roof. Type of material for the Rolled FLAT roof. What is the specific pitch 5/12 of the PITCHED roof? How many squares are 14 part of the PITCHED roof? Describe the roofing GAF Timberline HD materials for the PITCHED roof: Type of material for the Asphalt PITCHED roof: Provide any additional Re roof house and detached garage detail here on the description of work. (Is this for a house or garage? Etc) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will 19 be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Name of Applicant Mike Harrell Email not displaying correctly? View it in your browser. 20 0 C:C::O ROOF AND SOLAR THIS AGREEMENT, IS BETWEEN: 610 S. 4, n Street Denver, CO 80223 T 303.4, )854 F 303.600.0062 customerservice@ecoroofandsolar.com www,ecoroofa ndso la r.com (Property Owner(s) Name) (Subject Property Address) 6J'eZ L (City, State & Zip) (Phone) (Email) ECO Roof and Solar will advocate the Property Owner(s) best interest in restoration of property damage and complete all work in accordance to Insurance company agreed scope of loss. Agreed upon price will become the final contract price and ECO Roof and Solar will receive all proceeds for the work completed by ECO Roof and Solar. Upgrades and any other work will be a separate contract between the Property Owner(s) and ECO Roof and Solar. if the Insurance Company denies this claim this contract will terminate and neither ECO Roof and Solar nor the Property Owner(s) are obligated to one another. ECO Roof and Solar will furnish all labor and materials to construct and complete the following general services: o' 9 Tear off layers of roof covering ❑ Y. CDX lay over exist (if required per code) D'rutall decking (7/16" OSB) (add cost beyond 5 sheets) stall new underlayment L1-1`6) ii pre -painted eave metal to code-colorLl� Vi tall new flashings as needed !a'Replace vents as needed ❑ Re -flash chimneys and all wall abutments as needed Special Instructions: pns-sl e IST Shingle color ngle manufacture / model, eplace gutters and downspouts as required 93-Valley(s) will be closed €-...--•' open Q -move all debris resulting from above work ❑ Clew out gutters O- Kake a magnetic sweep for removal of any nails i,,1.5,J'e'ar workmanship warranty All construction will be completed in compliance with prevalling building codes of the governing municipality. ECO Roof and Solar Insured by: Moody Insurance Agency 8055 east tufts avenue, suite 1000 Denver, CO 80237 T. 303.824.6600 F. 303.370.0118 Contract Price: $ f ( t f��• -2V�L /O)0/44meowner agrees to pay ECO Roof and Solar total contract price.) ECO Roof and Solar will not pay, waive, or rebate all or part of any Insurance deductible applicable to this insurance claim. o erty owner attests that ECO Roof and Solar has not promised or agreed to pay, waive or rebate all or part of any insurance deductible, in any form. _ Initials Approximate Start Date: '4i 'S" A—P, Approximate Completion Date: SCHEDULE OF PROGRESS PAYMENTS: The schedule of payments outlines the initial payment, due upon material delivery, and the final payment due upon completion of construction. ECO Roof and Solar will require payment of ACV amount prior to stat of construction. ECO Roof and Solar will hold in trust anyavments received from the customer until materials have been delivered to the subject property or performed the maiorityof work. ACCEPTANCE OF PROPOSAL: In accordance with C.R.S. Section 6-22-104, property owner will have a 72 -hour right to rescind this contract. Customer will be extended all rights under t>R>S> Section 6-22-104. The above specifications and all terms and conditions are agreed to and hereby accepted. Initial Payment $ i:Q1.. (.a 7: r/r I Construction Completion Payment $ ZK (..,)�/• Insurance Company 5 %%LY Claim # l ltrl z L P, Mortgage Company _ Loan / Tracking #__ Property Owner Signature: X Y �/ � � —_ Date _ (,411111 ` Date ECO Roof and Solar: X i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 306 4 Job Address: 3 ' -3 -511 - Permit Number: '9017709 %y ❑ No one available for inspection:' 'me AM/PM Rednspection required: YesVfor *When corrections have been made, inspection at 303-234-5933 Date: -11/,7//7 Inspector: MT1V DO NOT REMOVE THIS NOTICE INSPECT • „. a , .. . . �, VMf 4* MptyuM� M � 03/95/2815 14'1 CDBA Install 556 gallon el 182 ANOUNT BPSP 3636 koes ST 33. PPLI E . 2015 #030 PAYMENT RECEIVED ANGUNT VII / 5681 83,22 ;RUTH DE @196 TOTAL . 2 : • T f T WIL CERTIFICATE OF OCCUPANCY IS ISSUED MAR /05 /2015 /THU 2:22 P P, 001/001 a+t t s .. FORM (F) 414-02-5147 fl Xcel Energy'. FLOC< 121235 APT. NO. SPECIFY ACTION TAKEN NO SHUTOFF APPLIANCE OFF o BOTH APPL & METER OFF o METER SHUT OFF - WARNING - /:3 3 THE CONDlTlON FOUND. AS SHC:MtII BElCM( IS NOr IN COI\.1Pl.IMCE W'ITH OJRRENTlY ACCEPTED PRACTlCES AND PROCEDURES AND COUW (RE.lU'E A HAZARD. CORRECOONS SHOULD BE M\DE BY A QUAUAED CONl'RACTOR. CONTACT 'y()lJR lOCAL BUIlDING DEPARf- MENT FOR CODE AND PERMIT REQUIREMENTS PRIOR 10 PBlFORMING REPAIR WORK. ~~-~....~----_....._-~~.._-- ..._,",,-,-~,,-~--'--'~- .-.---",- _._..._~-~~~~_."......-_._-~.,,-" DEPARTMENT OF PLANNING AND DEVELOPMENT BUILDING INSPECTION LINE - 303-234-5933 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 - (303-235-2855) Building Permit Number: Date: 13509 3/4/02 Property Owner: MICHELLE ESPINOZA Property Address: 3636 AMES ST Contractor License No. : Company: Phone: 432-7829 Phone: Construction Value: Permit Fee: Plan ReView Fee Use Tax. $250.00 $23.50 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record: that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application, and that I assume full responsibility for compliance with the Wheat Ridge Building Code (U.8.C.) and all other applicable Wh/ t Ridge ordinanc $, for work under this permit. (OWNER)(CONTRACTOR) SlQNEDi . II Ldi. so 00 Total: $625 $29.75 Use: Description: 150 AMP SERVICE CHANGE AND REFEED EXISTING PANEL Ifi?J~I]) BUILDING DEPARTMENT USE ONLY '*'- __I~.~ffim!!i!f SIC Sq Ft Approval: Zoning: --- ~~Mm~ Approval: Approval: Occupancy: Walls: Roof: Stories: Residential Units. Electrical License No : Company: Plumbing License No . Company: Mechanical license No Company. Expiration Date: Approval: Expiration Date: Approval: Expiration Date: Approval: 14} (5) (6) This permit was issued in accordance with the provisions set forth in yopur application and is subject to the laws of the Slale of Colorado and to the Zoning Regulations and Building Code of Wheat Ridge, Colorado or any other applicable ordinances of the City. This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building authorized is suspended or abandoned fOf a period of 120 days. If this permit expires, a new permit may be acquired for a fee of one.half the amount normally required. provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes are made or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit. No work of any manner shall be done that will change the natural flow of water causing a drainage problem Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written approval on Inspection card oetore proceedi. ~.th succes .ve phases of the job. T. n. or the approval of drawings and specifications shall n.ot be construed to be a permit for, nor an approval of, any violation of the prov:. ns fth . ~ ~her ordinance, law, rule or regulation Chief Building Inspector (1) (2) (3) DEPARTMENT OF PLANNING AND DEVELOPMENT BillLDING INSPECTION LINE - 303-234-5933 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 - (303-235-2855) APPLICATION Building Permit Number: Date: Property Owner: iV\rc 1-,.. lie. fSf" "r>zR PropertyAddress:':?:><..,.:.s0 A..yys 5+ \),;V\e.,-\,' "'-:I Contractor License No.: Company: '1:102\'- Phone :l?e>lC)?') <.\2.'z-iRC'j' Phone: OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT 2~ (.:t:J Construction Value:$ ';0 Permit Fee:$ Plan Review Fee:$ Use Tax:$ Total: $ I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility fOf compliance with the Wheflt Ridge Building Code (U.B.C) and all other applicable Wheat Ridge Ordinances, for work under this permit. . . 1 ..--"; (0" NER)(CONTRACTOR)~lGNID! ) y.. <../JJ.l ~?<,,}' DATE:') -cj-O 2- c Description: /5'0 4fi1f )f'Yv'i CL (- hti:_nj'" (.uV:< v"le(~cl <'v,'sf/,I<' :.'Y.~nt' / )r BUILDING DEPARTMENT USE ONLY SIC: Sq.Ft.: ZONING COMMENTS: Approval: Zoning: BUILDING COMMENTS: Approval: PUBLIC WORKS COMMENTS: Approval: Occupancy: Walls: Roof: Stories: Residential Units: Electrical License No: Company: Plumbing License No: Company: Mechanical License No: Company: Expiration Date: Approval: Expiration Date: Approval: Expiration Date: Approval: (1) This permit was issued in accordance with the provisions set forth in your application and is subject to the laws of the State of Colorado and to the Zoning Regulations and Building Codes ofWbeat Ridge, Colorado or any other applicable ordinances of the City. (2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building authorized is suspended or abandoned for a period of 120 days. (3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be mnde in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year_ Ifchanges have heen or if ~lI~pen$i()n or n\1nI10011111o:'111 exceeds one (I) year, full fees shall be paid for a new pennit. (4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem. (5) Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written approval on inspection cllrd before proceeding with successive phases of the job. (6) The issuance of a pennit or the approval of drawings and specifications shall not be construed to be a permit for, nor an approval of, any violation of the provisions of the building codes or any other ordinance, law, rule or regulation. Chief Building Inspector