HomeMy WebLinkAbout4000 Chase Streeti CITY OF WHEAT RIDGE
Building Inspection Division
(303) 235-2855 Office
INSPECTION NOTICE
Inspection Type:
Job Address:
Permit Number:
❑ No one available for inspection: Time AM/PM
Re -Inspection required: Yes No
When corrections have been made, schedule for re -inspection online at:
http.11www.ci. wheatridge.co. uslinspection
Date: i ` Inspector: "-..J"`.
DO NOT REMOVE THIS NOTICE
City of Wheat Ridge
Residential Roofing PERMIT - 201706913
PERMIT NO:
201706913
ISSUED: 09/04/2017
JOB ADDRESS:
4000 Chase ST
EXPIRES: 09/04/2018
JOB DESCRIPTION:
Residential re -roof
to install'Owens
Corning asphalt shingles with 21 sq.
Pitch = 7/12 (Third
party inspection)
*** CONTACTS ***
OWNER (720)938-7001
GUERRA FRANCISCO
SUB (72q)220-5283
Chris Vigil
170197 CV Restoration LLC
*** PARCEL INFO ***
ZONE CODE:
UA / Unassigned
USE: UA / Unassigned
SUBDIVISION CODE:
2412 / LAKESIDE, STEWART GARDENS, OLI
BLOCK/LOT#: 0 /
*** FEE SUMMARY ***
ESTIMATED PROJECT
VALUATION: 6,500.00
FEES
Total Valuation
0.00'"
Use Tax
136.50
Permit Fee
156.75
** TOTAL **
293.25
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name)
roof covering" is required to be on site at the time of final inspection.
Midroof & Final Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be
required, the 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped
off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the
Homeowner.
A r City of Wheat Ridge
Residential Roofing PERMIT - 201706913
PERMIT NO: 201706913 ISSUED: 09/04/2017
JOB ADDRESS: 4000 Chase ST EXPIRES: 09/04/2018
JOB DESCRIPTION: Residential re -roof to install Owens Corning asphalt shingles with 21 sq.
Pitch = 7/12 (Third party inspection)
I, by my signature, do her
attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtai this permit and perform the work described and approved in conjunction with
this permit. I further attest that I am legally aut rized to ' ude all entities named within this document as parties to the work to be
performed and that all work to be performed�clos m this d�ument and/or its' accompanying approved plans and specifications.
��
Signature of OWNER or CONTRArCTOR (rs,pannrod
ne) Date
1. This permit was issued based on the mforma vided in the permit application and accompanying plans and specifications and is
subject to the compliance with those docu all applicable statutes, ordinances, regulations, policies and procedures.
2. This. permit shall expire 365 days after th ate of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the originalpermit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applicable cod or any ordmor re ulat' n of this jurisdiction. Approval of work is subject to field inspection.
Z
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Dan Schultz Z'V C ` V 0 3
From: no-reply@ci.wheatri dge.co.us
Sent: Thursday, August 31, 2017 10:06 AM
To: CommDev Permits
Subject: Online Form Submittal: Residential Roofing Permit Application
Residential Roofing Permit Application
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
your contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a
residential roof?
How many dwelling units
are on the property?
PROPERTY INFORMATION
Property Address
Property Owner Name
Property Owner Phone
Number (enter WITH
dashes, eg 303-123-4567)
Property Owner Email
Address
Yes
Single Family Home
bL
4000 chase st
Francisco guerra
7209387001
Chrisvigil8955@yahoo.com
65
rr-
�
Do you have a signed
contract to reroof this
property?
Applications cannot be
submitted without an
executed contract
attached below.
Attach Copy of Executed
Contract
Yes
1504195322715468932885.Ipq
CONTRACTOR INFORMATION
Contractor Business Cv restoration Ilc
Name
Contractor's License 170197
Number (This is a 5 or 6
digit number for the City
of Wheat Ridge)
Contractor Phone
Number (enter WITH
dashes, eg 303-123-4567)
Contractor Address
(Primary address of your
business)
7202205283
8286 conifer rd
Contractor Email Address Chrisvigil8955@yahoo.com
Retype Contractor Email Chrisvigil8955@yahoo.com
Address
DESCRIPTION OF WORK
TOTAL SQUARES of
21 ✓
the entire scope of work:
Project Value (contract
CiE�)
value or cost of ALL
materials and labor)
Are you re -decking the
No ✓
roof?
/
Does the scope of the
No
project include a flat roof
(less than 2:12 pitch)?
66
Does the scope of the Yes
project include a pitched
roof (2:12 or greater
pitch)?
How many squares are 21
part of the pitched roof?
Describe the roofing Owens corning
materials for the pitched
roof:
Type of material for the Asphalt
pitched roof:
Provide any additional 7
detail here on the
description of work. (Is
this for a h
e? What is the roof l
pitch? Etc)
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this Yes
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
67
and to perform the work
described above.
I attest that everything Yes
stated in this application
is true and correct and
that falsifying
information in this
application is an act of
fraud and may be
punishable by fine,
imprisonment, or both.
Name of Applicant Chris Vigil
Email not displaying correctly? View it in your browser.
68
AGREEMENT
tREFEAtRFEDD CV Restoration LLC 4
(724)-220-5283
Inspector Name
Inspector Phone
Owner�,? f,5 o c� Date _'. *--- Email Address -
Street S Work Phone
.OnoCell. Phone 7zo �g Zoo/
City
9 ,Pd State D Zip<� Home Phone
rs�nrnuraav �t7De 15LIRieCi IO InSUranCp annrrn»Il•VS
---y _— - --.--
year Workmanship Warrant
�Pear Off
Recover Roof
aul Off Construction Debris
with rq vt
k44,andscape Protection
Below 2:12 ❑ Above 6:12 ❑ ,Above 12:12
Well Magnet Through Yard
7P Ventilation )N Box. ❑Ridge ❑Other -4p=- -�
Painting
Ice &Water Shield to local code
�, Siding Details. (:Describe)
Shingle/Color �� n
Hip and Ridge %Standard ❑ High Profile
€ ��
Decking Q OSB ❑ CDX. ❑.-O.ther
Underlayment 115 lb❑30lb ❑Other rn ,
rMetal Edge Color jt1 jK4e
❑ Trim Coil Brand/Color:
Val1ey ❑Closed ❑Open►
Pipe Flashings 03/1 ❑LeadGutter
House Wrap or insulation Board
Nails
S e -Linear Feet Size;
El Open Eaves
❑ Chimneys ❑ Si-ze(s)❑ TV Dish _
`Color: Downspout lineal feet
Downspout Size: 2x3" 3x4" A Elbows 6 Elbows
❑ Solar Panels El Swamp Cooler [I A/C
A/C Unit
Inside Miters Outside Miters # of Stories
❑ Tempered Skylights ❑ Dome Skylights
— _
❑ Bay windows ❑ Downspout Extensions
El Flat Roofs Type
0 Misc. Details
_
Furnish all materials, labor, and necessary permits
arms: This Agreemert is contingent upon insurance company price and approval. This agneetrieret does not obligate the 4testorner or any way unless
It Is approved bV-cu#o neA kavranoe company.ond accepted by the Comperryrn
. custoees signature below also s flies er i
of
s
all terms and conditions
of this Agreement, in situations where supplements for addfdonal work are necessary outside of the original scope
+�Company will Compawill seek approval from Insurance� of work (ex. Additional layers or
ominpany. customer's out of Pocket expense
Insurance related Renes. Payment method: payment Upon completion of Each
not to exceed deductible plus upgrades for non -
Trade.
Estimrtrd Date of R90 0oritplliian d
Estimated Cost of Repairs !S 1�r �✓yre E-
,,......��Cu-
Idd'stomer
�V
(a+bied ib dw-va, and ukiaut* defined 6 y f appcovad trice estbmu)
Signature
Receiof Payment Received!
❑ Customer Signature
Rep Signature (O 9
The Company shall holdin tru payment received from You until delivery of roofing material to the site
5 OF 616/12, ROOFIN CONTRACTORS IN COLORADO ARE PROHIBITED FROM WAIVING, DISCOUNTING,
REBATING, OR IN ANY WAY REDUCING THE AMOUNT THE CUSTOMER IS REQUIRED TO PAY FOR THEIR
DEDUCTIBLE AND ANY VIOLATIONS IS PUNISHA-_BLE ASA CLASS 2 MISDEMEANOR
(720)-220-5283 7912 Clarkson Ct. Denver, Co 80229
zo l ?0613
g000 aaw Si, 1NSPECYIL AELo%o#%0
INSPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/inspection
INSPECTION REQUEST LINE: (303) 234-5933
Cancellations must be submitted via the online form before 8 a.m. the day of the inspection
L.npancy/Type
%//2
Inspections will not be performed unless this card is posted on the project site.
**Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.**
Inspector Must Sign ALL Spaces pertinent to this project
Foundation Inspections Date Inspector Comments
Initials
Pier
Concrete Encased Ground (CEG)
Foundation / P.E. Letter
Do Not Pour Concrete Prior To Approval Of The Above Inspections
Underground/Slab Inspections Date Inspector Comments
Initials
Electrical
Sewer Service
Plumbing
Do Not Cover Underground or Below/In-Slab Work Prior To Approval Of The Above Inspections
Rough Inspections
Date
Inspector
Initials
Comments
Wall Sheathing
-
Mid -Roof
Lath / Wall Tie
Rough Electric "
Rough Plumbing/Gas Line
Rough Mechanical
Rough Framing
Rough Grading
Insulation
Drywall Screw/ Nail
Final Inspections
Date Inspector
Initials
Comments
Landscaping & Parking / Planning Dept.
Inspections from these entities should be requested
one week in advance. For landscaping and parking
inspections call 303-235-2846. For ROW and drainage
inspections call 303-235-2861. For fire inspections
contact the Fire Protection District for your project.
ROW & Drainage / Public Works Dept.
Floodplain Inspection (if applicable)
Fire Inspection / Fire Protection Dist.
Final Electrical
Final Plumbing
Final Mechanical
Roof
Final Window/Doors
Final Building
NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate
of Occupancy is issued. Approval of the Final Building inspection goP.s not constitute authorization of occupancy.
*For low voltage permits — Please be sure that rough inspections arP
by the Building Division.
Occupancy Is Not Permitted Until F
Protect -
*he Fire District and electrical low voltage
yy Is Issued
City of Wheat Ridge
Residential Roofing PERMIT - 201706913
PERMIT NO: 201706913 ISSUED: 09/04/2017
JOB ADDRESS: 4000 Chase ST EXPIRES: 09/04/2018
JOB DESCRIPTION: Residential re -roof to install Owens Corning asphalt shingles with 21 sq.
Pitch = 7/12 (Third party inspection)
*** CONTACTS ***
OWNER (720)938-7001 GUERRA FRANCISCO
SUB (720)220-5283 Chris Vigil 170197 CV Restoration LLC
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 6,500.00
FEES
Total Valuation 0.00
Use Tax 136.50
Permit Fee 156.75
** TOTAL ** 293.25
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name)
roof covering" is required to be on site at the time of final inspection.
Midroof & Final Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be
required, the 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped
off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the
Homeowner.
Property Address
Permit Number
Permit Issued Date
Third Party Form Check List
11 V 2�' , / --5
Owner Information
Property Owner Information
Property Owner Address
Inspector Information
Inspection Company
Inspector Name
Inspector Contact info.
(fe5e3 C 2
UCC) C- A Cts,
inspector Statement and Acknowledgement
I Nearby acknowledge the roof I am inspecting is 6/12 or over all roofs
that are under 6/12 must be inspected by the City of Wheat Ridge Buiding Dept.
* I hearby acknowledge the roofing system for the referenced building has been in:
and found to be in compliance with the minimum requirements of the 2012 IRC an(
IBC as well as all City of Wheat Ridge Policies and Procedure and Manufacturer's
recommendations ands
Inspector: %P Dater 7
Property Owner Statement of Acknowled+oement
*i hearby acknowledge that I am the owner of the building referenced above and 1
my consent for the listed third -party inspection company to perform my roof inspea
in lieu of the City of Wheat Ridgeuiic " g Division inspection.
Propery Owner/ Agent: I Date:`
This original document as well as tWroofing check list, must be submitted to the C
Building Officai within seven days of the final inspection.
Drop off in person Submit via Email
Permit counter 2nd floor KcookOxi.wheatridQe.co.us
7500 W. 29th Ave
Wheat Ridge CO 80033
Drafted Date: 7/26/17
The City of Wheat Ridge��
Inspection Check List notes
Mid -Roof
Roof Inspection
❑ N/A
❑ Pass
❑ Fail
❑ N/A
Zass
❑ Fail
Structural roof components
❑ N/A
ass
❑ Fail
Verify that no more than 2 layers of shingles exist
❑ N/A
& Pass
❑ Fail
Flashing for roof and walls
�,)�(�
❑ Pass
❑ Fail
If new sheathing is installed verify that it is listed in the
permit description (Valuation must be adjusted)
jA
❑ Pass
❑ Fail
Verify sheathing nail pattern (See Policy & Procedures)
/A
❑ Pass
❑ Fail
Crickets and saddles where needed
N/A
Pass
❑ Fail
Verify B vent must have boot same gauge as pipe
❑ N/A
Pass
❑ Fail
Verify vent caps
F] N/A
Pass
E] Fail
Verify no flashings are damaged or rusted
❑ N/A
ass
❑ Fail
Step flashing shall be min. of 44 piece per shingle
,t4 -N/A
❑ Pass
❑ Fail
Verify scuppers allow for proper drainage
❑ NIA
in—Pass
❑ Fail
Ice and water shield 2' in heated wall spaces
❑ N/A
"Pass
❑ Fail
Underlayments must follow 2012 IRC / 2012 IBC
❑ N/A
ass
❑ Fail
Verify roof slope for proper drainage
❑ N/A
Pass
❑ Fail
Dripedge shall have min of 2" overlap
❑ N/A
-amass
❑ Fail
Dripedge should extend down min 2" past roof deck
❑ N/A
Pass
❑ Fail
Dripedge shall be mechanicaly fastened 12" OC
❑ N/A
Pass
❑ Fail
90 LB roll roofing shall not be applied to roof slopes
less than 2:12 slope: Exception, detached garages,
patios, carports, open on three sides with min. slope of
1:12
N/A
❑ Pass
❑ Fail
Modified Bitumen, EPDM, TPO min slope 1/4:12 slope
N/A
❑ Pass
❑ Fail
Above roof insulation R-25
N/A
❑ Pass
❑ Fail
Below roof residential R-38
N/A
❑ Pass
❑ Fail
Below roof commercial R-32
N/A
❑ Pass
❑ Fail
Modified Bitumen, EPDM, TPO min slope 1/4:12 slope
must be installed in accordance with the manufacturers
specifications- Must have manufactures letter of
warranty with the address on the letter for final inspection
Metal Roof Shingles
Requirements
N/A
❑ Pass
❑ Fail
Metal roof shingles shall not be installed on slope less
3:12
N/A
❑ Pass
❑ Fail
Metal valley flashing shall be the same material as roof
N/A
❑ Pass
❑ Fail
Metal valley flashing shall extend a min of 8" from the
centerline with a min. of 3/4 " high splash diverter
rib built-in at the flow line with sections overlapping a
a min. of 4"
Tile Roofs Requirements
❑ N/A
❑ Pass
❑ Fail
Clay and concrete tile shall have a min. 2-1/2:12 slope
Slopes 4:12 and under require double underlayment
��i
Inspection Chedc List notes
Mid -Roof
Company Name. -C, (5—:2 LL<= -
Inspector signature:
Date of Inspection: y -
The City of Wheat Ridge
Inspection Check List notes
Final Roof
Roof Inspection
❑ N/A
❑ Pass
❑ Fail
❑ N/A
Pass
❑ Fail
Structural roof components
❑ N/A
ass
❑ Fail
Verify that no more than 2 layers of shingles exist
Pass
❑ Pass
❑ Fail
❑ Fail
Flashing for roof and walls
If new sheathing is installed verify that it is listed in the
VINIA
permit description (Valuation must be adjusted)
❑ Pass
❑ Fail
Verify sheathing nail pattern (See Policy & Procedures)
/A
�❑
F-1Pass
F-1FailCrickets
and saddles where needed
N/A
Pass
❑ Fail
Verify B vent must have boot same gauge as pipe
❑ N/A
12rpass
❑ Fail
Verify vent caps
❑ N/A
Pass
❑ Fail
Verify no flashings are damaged or rusted
❑ N/A
Pass
❑ Fail
Step flashing shall be min. of 44 piece per shingle
❑ Pass
❑ Fail
Verify scuppers allow for proper drainage
Pass
❑ Fail
Ice and water shield 2' in heated wall spaces
❑ N/A
Pass
❑ Fail
Underlayments must follow 2012 IRC / 2012 IBC
❑ N/A
Pass
❑ Fail
Verify roof slope for proper drainage
❑ N/A
ass
❑ Fail
Dripedge shall have min of 2" overlap
❑ N/A
`Pass
❑ Fail
Dripedge should extend down min 2" past roof deck
❑ N/A
Pass
❑ Fail
Dripedge shall be mechanicaly fastened 12" OC
❑ N/A
93Pass
❑ Fail
90 LB roll roofing shall not be applied to roof slopes
/
less than 2:12 slope; Exception: detached garages,
patios, carports, open on three sides with min. slope of
1:12
N/A
❑ Pass
❑ Fail
Modified Bitumen, EPDM, TPO min slope 1/4:12 slope
N/A
❑ Pass
❑ Fail
Above roof insulation R-25
N/A
❑ Pass
❑ Fail
Below roof residential R-38
N/A
❑ Pass
❑ Fail
Below roof commercial R-32
N/A
❑ Pass
❑ Fail
Modified Bitumen, EPDM, TPO min slope 1/4:12 slope
must be installed in accordance with the manufacturer's
specifications - Must have manufacturer's letter of
warranty with the address on the letter for final inspection
Metal Roof Shingles
Requirements
N/A
❑ Pass
❑ Fail
Metal roof shingles shall not be installed on slope less
3:12
N/A
❑ Pass
❑ Fail
Metal valley flashing shall be the same material as roof
N/A
❑ Pass
❑ Fail
Metal valley flashing shall extend a min of 8" from the
centerline with a min. of 3/4 " high splash diverter
rib built-in at the flow line with sections overlapping a
a min. of 4"
Tile Roofs Requirements
N/A
❑ Pass
❑ Fail
Clay and concrete the shall have a min. 2-1/2:12 slope
Slopes 4:12 and under require double underlayment
Inspection Check list notes
Final Roof
Company Name: L Lr
Inspector signature:
Date of Inspection:
N
..0
.:::l
3'
(Q
...)>
-a.
3
S'
iii'
....
~ "'j
.Jll/
....
.0
..
o
:::r
iii'
,.-..
.m
5.
~
S'
CD
:::l
1/1
'0
~
C'l
o
..
000
-NO
<00 a.
:SS'f)
c:-m
mOa.
o():::;:
~.';:'; o'
00::1
~.~~
ZZ
mm
00
z
o
C'l
:::r
'ODl
...:::s
-'10
g ~
::Un
o:r
~.'SU
~,(') =
o$1:l"
3Jll~
:::l
....0.3
:r. Dl
.~Dl Co
O.:::l ~
-,.~ -,
.:< ~ :::l
009=
....~..~
c::\..
<_.c
:r..~ 1/1
~C'l.~.
Dl Dl.O.
..........
...$....
(f1fo#",'/......
'Co-,..o:::r.
.-t\'-.
10. .1/1
1D'0.1:l"
. o.c
.C'l
C -.
.,'0:
'0. _.
Dl.:::l
:::l1Q
~~
;:;:
:r
o
c
-
o Dlen
Z~._.'
OC/l~
1D
iil
a.
."
o
::u
-l
I
m
."
o
r
r
o
~
z
Q
"tI
C
::u
"tI
o
.en
m
V>
~,
~
<0
~
(1)
"T1
'"
3
~.
~
'"
(1)
III
0-
(1)
~.
n
(1)
~.
r "tI () ~ -" -I "tI
m ::u 0 ~cn,=r CD
Q 0 z c. 3 en" 3
)> z c ;::;: C"l
"tI -l "',,<0
r m ::u m '" ;l. ;::+'
0 S )> ::u 0>33; z
m " n C
() a. e- '"
en -l C"l a. '" CD 3
~
() )> 0 '" '" '" < rr
< CD
::u 0 .~ .... '" " '"
:;:r 5" a. ~ ~
"tI 0 )> (1) ai ~
" 0 '"
-l ::u 0 ... 3 " '" -
~. "6' ......
~ m 0 ~ "''' SO " co
en ;0 '" 3..8 !!t ili ....
en -" ..,.
m :IE: D> tn. ",S' Q' ......
en (1) :;;.;l.<o o'
en c- 0,,< "
III 00..0" ..
.... '.
ft) -'co,.s. 0
... ::l: .., :f {J) 0::
<:> 0 CD ,0,-- rn
~ "
<:> 3 00'<0
<:> (1) -'CD :0/
0 ..;: 0.8
n :e: aO",~ ~)
:;:r ~
'" (1) ::E~- .......
III .., 02 ~ '::n
(1) ::T:;;n
CD -,...... :::r 0
Vl tu a.m CD .-..j .... ~.
.... -00. lllCJ1-l
... ;;0",,,, ;;0-<
(1) -'(,1) '::I
(1) g. h ,e: 0:00 ~
.... '" 0 0
'3 ~ l.C ~." Nt
"'" SO ,CD. ::E
:::1.-
:0.'< '" 0
)> 3 :;; c: ()I\J::I:
,.,~ o..~m 11
0 '" o :;r.)>
'< ::T
0 r::r....."'O iil )>-l /Q/
::u m';j' a
,CD-o o.(ji;;o
m o ::E 0 O.
en O,:cn o :::l.6
en g::T '" oc,,::: G) 0
~; ~ P- OCD
(D.-O o m ~/
... Q.,;J:: w
<:> b' a>:J" VJ' "'0. .
<:> ':'"'l co' CD )i
<:> - '" e-
::T CD~ <:
n '"
:;:r ceo.
'" UJ =5" 0..
III CD 9:cc
(1) " -<
.{g (0',\1)
Ul m'O ,::I
.... 0' ,0.
.., -.0 0- 0
(1) =ba....,
(1) ~~,~ ~
.... NCD
03
::::I _.
5' '"
co~ \0
III c: ......
" w
a. "
a. <:>
om
-~ <.T1
::T_
CD,;:S
..., CD
~
"'Ol
-:'0"
,~o
'" <
a.'"
C
<Jl
CD
Date:~-\ do -~
A Certificate of Occupancy I Completion
has been requested for:
: ADDRESS:
(\ a ffi
~JH\S<C ~.
PURPOSE OF STRUCTURE:
,-7
Remarks:
y( Building Department Approval:
~ <Zoning Approval: /~ r r
Remarks:
. Public Works Approval:
Remarks:
Fire Marshall Approval:
(If Applicable)
Remarks:
: Sanitation District Approval:
(If Applicable)
Remarks:
Water District Approval:
(If Applicable)
Remarks:
. ~'_ "v-'.fv~.'''- '~- _"'_" ',,',
/0/'...3
COMMUNITY DEVELOPMENT DEPT.
Inspection Services Division
(303) 235-2855
Correction Notice
Job Address: 4000 CHASE. 57:
r//VA"L ./?/.//LLJ Nt1/)I//4/?
fj"
/. > ~ ~ Ao/7';"" ~: /""'<E
~~4-mT ~"i;;:;;,,~""
~RRN?'~.,c- ,/ /A/ ,~ ... "_A-'/~.
~r7a/4. ..s-."a,41;r~ ,
~~=;')""~~~ ~~
~; ~"""'77O::;: ::~"'~ ~ ~_ /"'.-"
1:~ .//1/sr ~~
4 ~ /'hN.P/~...c :1._ ~" .....,..-~.R'/~
~~""A// , S'.P""'~...c J
~-4Z~~~,,";:e
4 ~~-:=- ~ s .N, ~
O~ ./:)h~/ ~
l>/~"&;9PS.a~#6~ FAlJ.v:r
;!bRL'H
When corrections have been made, call for re-inspection at
303-234-5933.
Date:
c:J&
DO NOT REMOVE THIS NOTICE
20F3
COMMUNITY DEVELOPMENT DEPT.
Inspection Services Division
(303) 235-2855
Correction Notice
Job Address:
4a:lJ /?/lASE. ,<;7:
H/VAL gd//n M/1/>///AR
8 ~ /V'd #()r ~",rE7<.
~=A'c.. .3~' P/-e:K (!f!J h~z~R
~;,;;-_ p~ Hr-C R~~.J/,II2~~
(.. WAr..GE ha4~
/';:~~/ ARrJ/.J#D ~/'V}R
_ ~.--771aN (!!!!> / AU,A/F'>;(?V' A?t'Jn~
//. ~ / FAK ~ H"UW~Y -SH.o"JP;#>
#~LJ /"vAA"7)I;i'A"~
/2.7 A/'7//' AL'/~'J eCl/us:;;r;> r?AA/
Nor A"E ~.A!'-N~ ///.:"Alr ..<.<
'':;~;''-.n //.Rr/;'~ .o.,w/V' '" /AYO<_
a :sl//~N. #dST.8L!:. /NSr~N.7-)
~A"Ly:'"
.
!3 :> ..PA'o~.;V# ~/A'/N~ &' 4A!? ~A~
ffl# ~ Ah:e:S'S ao"C9V/N~
When corrections have been made, call for re-inspection at
303-234-5933.
DO HOT REMOVE THIS HOTIG
Date:
3 d-r3
COMMUNITY DEVELOPMENT DEPT.
Inspection Services Division
(303) 235-2855
Correction Notice
Job Address:
4.a?o ~A.se sr.
1=//11'/4, .(j'(//LO M~~~
L''j( ~ V.".Jt'7ZIRE .#'''''/Y~/#G ~CJH
,
~,,4L.L. /....v ,#",~ ~~~-' r H~s;;r
~ /MS.?;4/./~ ~/"7"h'.J. ~ .?
/5": 7 ~"'.,e.-A/7 /27ANVez:~ ./5 A/Q7
//1t'<Y".A//~ /N7b ...0.R.A/.AV/ ~i""/as-ueL
/~ ~ ~.A7~_D /.2-L! A/,,;v b//A'/"""~ cCI
u~ #t....,."otIC-l'tC
/~ ~~/~.s R~u'~ <9 ~A'M/"'-
~....w-.I L/~ .AtJL.L::<::"
,
-.5"".fl3"PP- /...u.f".PL'-........7~ cr U//L.L-.
O;./'/"~ L>/d/Si'oA/' t:7~ #aas "".",,&
OF /-S..sd~ .
When corrections have been made, call for re-inspection at
303-234-5933.
Date:
Inspector
DO NOT REMOVE THIS NOTICE
Job Address:
COMMUNITY DEVELOPMENT DEPT.
Inspection Services Division
(303) 235-2855
Correction Notice
4000 CHASE:: 57.
F/ i::'Gff/C - -S-~A'd//'/"'
/.
;;L~ A/Or
. ~(.//,c?;
,.'"5"";-(<>--r-..-9V '
/ /1/. )''7..4,6'//7"::)
~-<Ot>NC>/'<'/ k
When corrections have been made, call for -inspection at
303-234-5933.
Date: 07-LtJ-tlS
DO NOT REMOVE THIS NO
L
DEPARTMENT OF PUBLIC WORKS
REVIEW FEE STRUCTURE FOR BUILDING PERMIT APPLICATION
. --
Date: 0, l, 0 'J
Applicant: ~ tilT J2 ( (\.J 'Z-
\JI/BST'7 e.rhone #
30~ .C1IS'.I\.f lf3
Location of Construction: if 000 CH"fS6Z S 7J11'- -,
Pwpose of Construction: 5Fl<. Building Permit Value:
Single Family K
Commercial
Multi-Family
DEVELOPMENT REVIEW FEES
Development Review Processing Fee:
(For document processing)
$100.00
$ /00.00
Single Family Residence Review Fee:
(For review of applicable technical documents)
$50.00
$ 50.00
Cornrnercial/Multi-Family Review Fee:
. (For review of existing technical documents) $100.00
. (For review of technical documents for construction in
Right-of-Way, Final Drainage Report, and Erosion Control Plan) $500.00
$
$
CDOT Access Permit Fee: $150.00
(for document application and processing)
$
Traffic Impact Study Review Fee: $200.00
(For document review and processing)
$
TOTAL REVIEW FEES (due at time of building permit issuance):
$
/.5b.oo
PLEASE NOTE THAT IN ADDITION TO THE ABOVE FEES, THERE WILL BE ADDITIONAL LICENSING AND
PERMITIING FEES REQUIRED FOR CON TRUCTION OF IMPROVEMENTS WITHIN PUBLIC RIGHT -OF- WAY.
Signature of Applicant
Date
0JD7
K:\FORMS & l.ETTERS\DEVELOPMENT FORMS\Fe< Structure (6-S-04)_doc
Rev 6104
BuildingPermit
CITY OF WHEATRIDGE
75(}(} West 29TII Avenue
WI1eatridge, CO 8(}(}33
3(}3-235-2855
Perlllit Number
18787
6/1/2005
Inspection Line
3D3-234-5833 , '.
::C'l",*VAl~Ri<I::',::\,\,1
, ~, " ""!l' \
Residential Demolition
PROPERTY 4000 ChaseSt
OWNER: Michael Johnson
Unit:
(303) 825-0287
Description
Demolition ,of existing house
1
IPaid
1$50.00
1$50.00
I
I
IPhone
14566056
I
I
IMProved
I
IFEES
IFees
IPermit Fee
ITotal Fees
1
ICONTRACTORS
IName ILicense #
IColorado ExcavatinQ & Demolit 120568
1 1
IAUTHORIZATIONS 1
IType INotes
ISuildinQ Approval IState demolition approval
I
IDue
1$50.00
1$50.00
1
1
Uni~s:
Occupancy:
Roof:
Stories:
Sq Feet:
Walls:
I he~y:t:ertifythatihesetbllckilistances proposed-by th[s: permitapplicaliim areattunite;aild do not ViolJile applkableoniin~nces,ru1es~r regulations oftheClt)',of
Wheat Ridge or COVeJlllnts, easements or restrictions ofrecordj that all measurements ,shown. and allegations made IU'C accllTlIte; that I baverell-d and agree to abide by
aU conditions printed on this application, and that I assume full respomibllity for compliance . the Wheat Ridge Building Code (U.B.C.) and all 0 era plicable
Wheat Ridge ordinances, for worknnder this permit.
(OWNER){CONTRACTOR)
SIGNED DATE
/'
biOS-
Thispermitwas Issued in accordance with the provisions set forth in your application and Is subjectto the Iliws of the_ State of Colorado andto'the 2Aming
Regulations,and Building Code of Wheat Ridge, Colorado or any other applicable ordinances of the City.
2 This permit shallexpirc ir(A) the workauthorized is not commenced withinsb:ty (60) days from issue date or (B) the building authorized is suspended or
abandoned for,a period of120 days.
3 If this permit expires, a new permit may he acquired for afee ofone:-halfthe amount normally required, provlded no changes have been or will be 'mildein the'
original plans and specifications and any suspen.donor abanllonment has not,exceededone(l) year. Ir changes are, made or irsuspensionorabandonment
exceeds one(t) year, full fees sh_all be paid for a new permit.
4 No work of any manner shall be doilethat wlU cha:n:ge the natural flow ofwaterCllusing a drainage problem.
Contractor shall notify the BuUding Inspectortwenty-fonr (24) hours in advanceforall inspections and shall receive wrltleilapprovalon inspeetion card before
proceeding with successive phases of the job.
6 it orJhe'aPProval of dea nd specifications shall not be oonstru,ed to be a pennit for, nor an approval of, any violation of the
'b~,~,,"g~~~d;~or~.~~z. ance, law, rule or regulation. ''' ",h
~;,,>(.W;. C/p
SIGNED DATE
Wednesday, June 01, 2005
Pagel oft
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING INSPECTION UNE - 303-234-5933
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80033 - (303-235-2855)
APPLICATION
.
Property Owner: fIUt{;.f;ak( /01/ I7Hf r)
Property Address: 4000 ~ S'-r
Contractor License No.:
Company: ~a.lo UCt? vt:jrh-n
Building Permit Number:
Dale:
Phone:.5 Q) -J2J -0 d.f 7
OWNER/CONTRACTOR SJGN.A TURE Of UNDERSTANDING AND AGREEMEN
Phone3Q3 -ItJ6~6tJ.r6
Bui/dino DeDt Valuation Figure: $ 3/ Jl:J o. 0 0
I hereby certify that the setback distances proposed by this permit application are
accurate, and do not violate applicab6e ordinances. rules or regulations of the City of
Wheat Ridge or covenants. easements or restrictions of record; that all measurements
shown. and allegations made are accurate; that I have read and agree to abide by all
conditions printed on this application and that I assume full responsibility for
compliance with the Wheat Ridge Buildmg Code (1.B.C) and all other appl~ Wheat
Ridge Ordinances. for wori<. under this rmit. Plans ubje field inspection.
1'-1-
DATE
Value:$
Permit Fee:$
Plan Review Fee:$
Use Tax:$
Tota):$
(QWNER)(CONTRACTOR):PRINTEO DATE
Use of Space (descripti02~:_. . lj. f
Description of work: UIU~ 9( f?,-t( '.Prf, . {;l
Sq. Fl. adcMd
BUILDING DEPARTMENT USE ONLY
SIC:
Sq.Ft.:
ONING COMMENTS:
Approval:
Zoning:
BuiLDING COMMENTS:
Approval:
1'u81.'C WORXS COMMENTS:
Approval:
IRE DEPARTMENT COMMENTS:
Approval:
bccupancy:
Walls:
Roof:
Stories:
Residential Units:
Electrical License No:
Company:
Plumbing License No:
Company:
Mechanical License No:
Company:
Expiration Date:
Approval:
Expiration Dale:
Approval:
Expiration Date:
Approval:
(4)
(5)
(el
This permit was issued in accordance with the provisions set forth in your a~ication and is subject to the laws of the State of
Colorado and to !he Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any _ applicable ordinances of
the City.
This permit shall expire if (A) the work authorized is not commenced within sixty (90) days from issue date or (B) the building
authorized is suspended or _ for a period of 180 days.
If this permit expires. a new permit may be acquired for a fee of one-half the amount nonnalty required. provided no changes
have been or will be...- in !he original plans and speeific:alions and any suspension or abandonment has not exceeded one
(1) year. n ehangeS have been or n suspension or abandonmenlex.-ls one (f) year. full fees shaN be paid for a new permit
No work of any manner..... be done that will change the natutaI flow of water causing a drainage problem.
ContradDr _ notify !he e.-.g Inspec:Ior twenty-four (24) hour> in advanoe for aU inspections and shaN receive written
approval on ~ C8Id before proeeedlng wiltl_ phases of the job.
The issuanee of a pennII or the approval of cItawings and speelfications shal not be eonslrued to be a permit for, nor an
approval of. _ vioIallon of !he provisions of !he building codes or ___nance.law. nJle or regulalion. All plan review
Is subject to _ Inspec:tIons.
(1)
(2)
(3)
Chief Building Offocial
Colorado Department of Public Health and Environment
Air Pollution Control Division - Stationary Sources Program - Indoor Air Unit
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
Phone: 303-692-3100 - Fax: 303-782-0278
E-mail: asbestos@state.co.us
DEMOLITION APPR()YAL NOTICE
"\
This approval notice is gr~subject to Cokn-adQAir Qua1ity~.Qntrol Commission
Regulation No.8, Part B1l!it6pted D~ber t 6, 2003~and effec~ March 2, 2005, the
Colorado Air Pollution pttventioit 8nd Control Act C;.R.~ \25-7 -l\\~d 25-7-50 I et seq).
This n?~ice signifies ~'the s~ ~as inspec~ f()~ !Sbes,t9s an~tFCS ~d the
demolItIOn contractor~ properly notipei:l tbeColoracio Dep8rbnentf'fPublIc Health and
Environment pursuant'F Re~on NO', 81 Part B. .. ' 1\
~: ~::~::~~~~y~;~o~;:d~~::~~mi~~:fJ~:=:~8,t#:~~ts;e~~:~~g::e
Colorado Department oI:Public ~lthand Envirerunent, Air Pollut,i9l1 Control Division,
strongly suggests that yo1i~heck With county and m~iPQ} authoA6es in order to determine
any other local building/pdtWtting requi~ts tbatnutSt be ~ .
THE ORIGINAL PE_l' MUST BE POSTED Ql'I(:SfrE AT ALL TIMES.
<,,-
Immediately notify the Unit of project modijic'tliionsby.r-'(tiumber above) or e-mail (address above) and
the appropriate county health department by fax. Project modifICations include changes in the scope of
work or the scheduled work dates, etc.
This demolition notice is valid beginning 4/17/2005 through II :59 PM on 4/26/2005.
The actual scheduled work dates are from 4/17/2005 through 4/26/2005.
Approval issued on: 4/7/2005
Record number: 46042
Notice Number: 05JE1889D
For the location specified below:
Amount Paid: $55.00
Check number: 1201
Asbestos Building Inspector:
Lars Malmstrom
Cerificalion No.: 282
Inspection Date:
OS/29/2005
4000 Chase St.
Wheat Ridge
Jefferson County
This notice has been issued to:
Colorado Excavating
11650 W. 68th Ave.
Arvada, CO 80004
I~oodby~ ~
FRDM : COLORADO EXCAUAT I t-I3
PHONE ND. : 303 403 1808
_Apr. 21 2005 05:09PM P1
~
Colorado Department of Public Health and Environ~ent
Air pollution Control Division - Stationary Sources program - Indoor AIr Unit
4300 Cherry Creek Drille South. APCO-SS-B1
Denver. Colorado 80246-1530
phone: 303-692-3100 - Fax: 303-782-0278
E-mail: asbestos@state.co.us
--,,-,-"-'~--
"'. :
This demolition notice is valid beginning 4/17/2005 through II ;59 PM on 4/26/2005.
The actual scheduled work dates are from 4/17/2005 through 4/26/2005.
Approval issued on: 417/2005
___,R~.91d.!l)JIllb_eJ: 4~2 ....
. Notice Number: 05.JE1889D
For the location specified below:
Amount Paid: $55.00
.Ghe.l'knmnber: 12QL
AsbeStos Building Inspector:
Lars Malmstrom
Cerific:ation No.: 282
Inspection Date:
OS/29/2005
4000 Chue St.
WbeatRidge
Jefferson COUDty
. This notice has been issued to;
Colorado Excavating
11650 W. 68th Ave. .
Arva..... CO 80004
-~"2
BuildingPentlit
CITY OF WHEATRIDGE
75(}(} West 29TII Avenue
Wheatridge, CO 8(}(}33
3(}3-235-2855
P~rmit Number
18741
5/20/2005
Inspection Line
3D3-234-5833 ,
ResidentialNew SFR
PROPERTY 4000 Chase St
OWNER: Catherine Webster
Unit:
(303) 915-7443
Description
New modular with demolition of existing home
IFEES
IFees
IEnQineerinQ Review Fee
IPermit Fee
IPlan Review Fee
IUse Tax
Total Fees
1
IDue
1$150.00
1$1,823.39
1$1 ,185.20
1$3,106.21
$6 264.80
1
1
ILicense #
117674
122151
122169
1
I
1 Notes
1
IPaid
1$150.00
1$1,823.39
1$1,185.20
1$3.106.21
$6 264.80
I
I
!Phone
14237905
17208983446
13039345
I
1
IApproved
1
ICONTRACTORS
IName
IB & B HeatinQ &A1C
ILeQacy Mechanicallnc
IRONALD ARNDT
I
IAUTHORllA TIONS
IType
Units:
Qrclipan'cy:~R~3
Walls:
Roof:
Stories:
Sq Feet:
o
I hereby certify thatthe'sethackdistances proposed by this permit applicatio~lIre, accurate, and do not violaleapplicable lirdinances,ruleSor regul1i.tions_of the City of
Wheat Ridge or covenan ,easements or restrictions ofrecoi'dj Ih' II measurements shown,-and allegations made are accurate; that I have read and agree to abide by
aUconditions printed (I this application, a d th II}I- pUllsibility for compliance witlithe Wheat Ridge Building Code (U.B.C.) and all olher_applicable
Wheat Rid or II, es,forworkunde is ertnit ' /: , ,,'~
fg i/ (:,.;, OJ
SIGNED DATE
This "nnit was issued maccordance witbthe provisions set forth in your application and-is subject to the laws of the State of Colorado IInd'to the ZOiting
Regllbitious and Building Code of Wheat Ridge, Colorado or any other appllcable,ordinances of the City.
2 This pennit shaUexpire if (A) the work authorized is not commimced within SIXt)'(60) daysfroin isrnedate or (B) 'the buildingauthoiiied is suspw.dedor
abandoned for a periodofl20 days.
If this permit expires, It ncw pcrmilriiaybe acquired fora 'fee of one-half the amount normally rcqilired,provided no ~hanges have been or Will be made in tlie
original plans and specifications and anysuspelL'lioll orabandoruuent has not exceeded one (1) year. If changes are made or ifsuspensioll or abandonment
exceeds one (1) year, Cull fees shall be paid Cor anew pennit,
4
No workoCany manner shaUbedline tbat will ebangetllenatural flow of water causing adi"aillage problem;
Contractorsball n~tiCy tbe Building Inspector twenty-four (24) bours in advance for all inspections and shall reeeivewritten approval on ln5pection card before
proceeding with successive phases of
Chief Building Inspector
SIGNED DATE
Friday, May 20,2005
Pagelof2
'~J..,A'''''.''''~',"~'''fJIII,.,~, ~.~"",.."r_."""'""""""'7!'-'lf."1l"'~,~,,J~~~~,"
'.', '
~~PERty4000 ' Chase St
O\VNtk: . Catherine Webster
I,' '0.;, .,.,
, .; "'W't'" "fir'" "",i.,.,,,
y'~..,
. 'NeW ~with demoliitton of existing home
Unit:
(303) 915.7443
,,' ., ~ '" !" ,1 ~
lok wi notes
roof drains to be directed E-W as indicated 0'
r.1 alih: house can't exceed35~ in ht: see me
15/9/200$ .,'.
5/
5/17
~Yll1U)~
' . Secdan - 26--501 (0,1)
,,,,_~dwtllln,.. t/JIjlnttl....II.I~
/HI pS, "''''''''WIY aro from 1M iIJdIIl"....
~~""""/1IliHIt"IM6IIall.uut/-wlllt IIII' -
.".".,~ 6r/ckpatIUI or Ilmilar'itUtlorl.18,
.t~ .~
: ~~
Q., ...~ J>";~
, ~l$t"YlY~.,
rfJ'.# ,#, (:> .i.,'<'
, -'. j;:l-G ".}!;,o No" ^
!If' ,0 goT G ,>' ", u'
~O-#'-/..tJ.'~~~.l'
/L.f #~~~O
, ~ ~~~~~~
,~~~
4~~
I
_.~ :
, 'a'lScA ' .,
. II! ~fr""'~a
'. , ~~ IlYretidentlaluses
.on. .S-lon-2~S02lD.I..&b)
L ./"""1/,," per leve1l/y (70) feel (or perllon
8eiba/1 "':".- ffW11aze 10 he p/oce" lVithin I"" fronl
... No t::. /hQ to 1.'WtimCJ! 1'f a certificale of occupancy.
kH (Imi:.mJ n ~enIJ'1itie pel'cenf (25") of Ihe [[rosa
of.~.',':::::" ehuntlretipercenl(IOO"6j
. .. ,,,;>>1..-.. land..caped.
,,' " -
'-t cs.
,}~.i
"'
:~
t,,,'i
. ' "
Doc.uments from the mamr.{QChmlr ~hall be
ol1S/te for final roofi1l8pBt!tion which speciJjJ,
roofing materltUs have b~>ins/ql/ed to meet
110 MPH three-second wind griit.-IBC (90
UPH wind load-UBC). ,
R.3 Walls: Roof: Stcliieil: Sq Feel: '" ~ '.
, ;',.. .'" ''''',' - .' , '_: "'" ,i,/",,,, ,_,,_, ,
~"~IUf",,* ~'b)' tllilpmn:Ji appUeadOa aft ilcaU'ate, anddG.oI....te ~ ~....'~~.;,_~~,..,. " -
': -, 1~Or . offtto ;thAt.lImeUUmibtiUs'.tIlo...,Dd...do......_~liIatl.....~..ijNle~_bt'
,dlJiI 1 uDrespoll8ibiHtyr6i'CCllllpliafteewklltlleWM.tlUdpatdldbllCOiih'(O..a.t.)U4......~-.
.'....uk' : .' ' "",'~ ~, , ,
4J
~./.o.
--
.!' ':';, :>:. .,;" _ ~ _ ' " , . >- ~- (.
~.~..'~ with tbe pmillk>>uJet fortb III yoarappucadOaOcI....jeetto'tHlaW. ofdlie...ot~...'ioiIW.~:
~~C~"'WheatRidF>,CoIendoOl"'.YOdlerapplk"kor""UlCelOrtbeCIt1., '.;.,,'" " _', ':. :.-;,/-:,_ '.
~IC_(A) the w'OI'k ..tboriUd" not commqeld wltb. dJ.ty (60) dl)'l fl'OSD.... date or (is) the bllJldla:.'..Choi'bililirll ~~
."': _', ~,~~12':d'JI., " ' ,_,' ',__ .f.._/
"~""~',aew'pirtalt''''''be~ for ..reeofo...wrdlunlollllt lIonully ....lllred,:provlUd DO ~~'I"..'_"'~.:'"
~~,Qd........d.lly.~orilb.Ddollmell.tJw...~_(I)year. lfdl.Jlllp.n...o;.Jt.........+f.. ,'" ~ ':~
.:;} ~,jU(f)yW-._:Mlletf.....l:lepl.IdIOtuewpermlt. , ' - - ," ',' : -'
.'\4 .":' ~.,~"!',fil:r..~_.u'be'dQlOedlatwWdlauCethu.tunIDowofwltereaulntldn.liup~1IiB. , _,' "" '" :-:-, ,
~_~_i ':,_ ~~....~~~Wpet:Ml' twnty.-follr(24) hOlln ~ It!vlllce for all InapeetION ud "'1II"'vewrittft~.. ~;~....n
',~~i'~~~oftheJob. " ','.
- , -~1Ii~ " '.. val n d lpecllleadolO"W not be_lItnIed,o"uperadt for........appnival.f...y'.Ii......it..
" or uy MJier ,lIw.rule orRluktfoa.
51 DATI:
..... Z of2
City of Wheat Ridge
Community Development Department
Memorandum
TO: Building Contractors
FROM: Planning DivisiorJtr
SUBJECT: Items to be completed/New Single- or Two-Family Structures
DATE: May 17,2005
Listed below are a few items to consider while finalizing construction of a single- or two-family
structure. Before a certificate of occupancy can be issued for a new single- or two-family structure,
the following items should be complied with:
1. If a driveway is proposed, the first 25 feet of drive surface area must be paved. The driveway
may be surfaced with asphalt, concrete, brick pavers or similar materials. The driveway must
abut the existing edge of asphalt on the street, which may require paving within the right-of-
way. If paving occurs within the right-of-way, a right-of-way permit is required from the
Public Works Department.
2. One street tree must be installed for every 70 feet of street frontage. If the structure is a
comer lot with frontage on two streets, each frontage is subject to this provision. These street
trees must be at least 2 inch caliper specimens.
3. One hundred percent of the front yard must be landscaped, excluding driveways and
sidewalks. The front yard is defined as the first 30 feet from the front property line adjacent
to the street.
4. At least 25 percent of the entire lot must be landscaped. The front yard landscaping may be
counted when calculating this figure.
5. No more than 50 percent of the landscaped area may be comprised of turf. Low water turf
(such as buffalo grass, blue grama grass and tall fescue) is encouraged.
6. No more than 35 percent of the landscaped area may be non-living material, such as rock or
bark. Living materials planted within rock or bark beds may be excluded from the non-living
calculations.
7. If the landscaping cannot be completed due to inclement weather, an escrow must be
submitted. The escrow shall be in the form of 125 percent of the value of the required
landscaped area.
8. It is possible that the Public Works Department may required either construction of curb,
gutter and/or sidewalk or that an escrow be submitted for the full amount of these public
improvements. It would be beneficial to contact the Public Works Department to discuss the
potential for public improvements.
9. Any fence, outbuilding, shed or detached garage will require a separate building permit.
.. 54' 0"
..
"
....
10'0
\()
\1)
- - - - -. - - - -
~
Q = 'D' f2-EC:PO,.J ()
~ EooF /)/!k1IJ.5
I!\
I(l
<<
CHASE ST
..
\4''0' ,
P-E.I\r.C"~ ~~'~I'N~
\1<."'~ A wI) (1 p..<.':'C;f.
1;:\(\-",1'1'-1<1 DElVE: 10
f\E:rYl,ll f~
CATHERINE WEBSTER RESIDENCE
4000 CHASE ST
WHEATRlDGE
CRAWL SPACE-MODULAR HOME
30'4" x 60'0" INCLUDING 8'0" BUll..T IN COVERED PORCH
RE-USE EXISTING WATER, SEWER, POWER, AND GAS
DEMO EXISTING HOUSE AND GARAGE
4
~
':.<
, -....1
'~'-'-'l
_-:>--~'l_
- . ,_I"
CIty of Wheat RIdge
Department of Pubic: Works
Emdneer's Cost Estimate
Escrow Funds for Public Improvements
4000 Chase Street (Catherine Webster Residence)
Item
Cost/Unit
2' wide X 6" HMA (asphalt) Patching: $ 36.00
6.5' Mountable Curb, Gutter, & Sidewalk: $ 21.00
Frontage length for 4000 Chase Street ~ 54.00 feet
Item Cost/LF LF Totals
HMA Patching: $ 8.00 54.00 $ 432.00
6.5' C, G, & SW $ 21.00 54.00 $ 1,134.00
Total Cost for Public Improvemeuts $ 1,566.00
{ftfOlL
7D
Estimate By: David F. Brossman, Development Review Engineer
Uuit
Date: 5/3/2005
SY
LF
(~ $8.00/L.F. for a 2' wide patchback)
CD .J
4000 Chase 4 PI Estim
"
'~. '...:'\
/~="'-
- -_~)"J
City of Wheat Ridge
Department of Publi<; Works
Public Improvement Requirements
All Site Developments within the City of Wheat Ridge are responsible for the completion of
the Public Improvements across the property frontage(s).
The following definition of "Site Development" was taken from Section 26-123 of the City of
Wheat Ridge Municipal Code of Laws:
Sec. 26-123. Definitions.
Site development. All construction and improvements on any parcel, lot or tract of property
within the city and on any structure (other than normal maintenance or repair allowed for
nonconforming uses), including but not limited to substantial clearing, grading, filling or
excavation, streets and roads, drainage, utilities, parking lots and structures, landscaping,
building, building additions or alterations, parking lot lights, street lights, signs and erection or
moving of structures.
The following excerpt pertaining to Public Improvement Requirements was taken from the
Building Permits Section 5-45 of the City of Wheat Ridge Municipal Code of Laws:
Sec. 5-45. Public improvements required.
(a) Applications for building permits shall be reviewed by the department of public works to
determine whether the proposed construction will require the installation or construction of
public improvements including, but not limited to, street paving, curbs, gutters, sidewalks,
drainage facilities, or other public improvements as may be required by ordinance or the
subdivision regulations.
(b) If it is determined by the department of public works that any such public improvements
are necessitated by the proposed construction based upon the specific adverse effects created
by the proposed construction, including, but not limited to, drainage, traffic, street continuity,
curb, gutter and sidewalk, relocation or undergrounding of utilities, street lighting, roadway
construction), the department of public works shall so inform the building official, and in such
event a condition shall be inserted in the building permit which shall require the construction of
such public improvement or public improvements by the property owner and the dedication
thereof to the city. All such improvements are to be constructed in full compliance with the
city's engineering division regulations, design standards and construction specifications. The
cost of any such improvements shall be borne by the property owner, and the construction
thereof shall be at the sole cost, risk and expense of the property owner, subject to the
provisions of any applicable city ordinance, regulations or policies. Subject to the requirements
of paragraph (c) below, failure to construct any such required public improvements shall entitle
the city to withhold any certificate of occupancy.
(c) If it is determined by the department of public works, after consideration of the factors
set forth below that such public improvements may be placed at a later date. An escrow
amount equaling one hundred (100) percent of the estimated cost of the required public
improvements shall be deposited with the city. The cost estimate will be prepared by the
engineering division, based upon current construction costs prior to issuance of a building
permit.
(I) The installation of curbs, gutters and sidewalks and related roadway improvements may
not be required where less than half of the properties on the street extending five hundred (500)
feet from the lot lines of the property in question, on both sides of the fronting street, have in
existence curbs, gutters and sidewalks.
(2) No curbs, gutters and sidewalks shall be required for a remodeling of an existing
building.
(3) Installation of curbs, gutters and sidewalks would be impractical or economically
unfeasible or not in the best interest of the city at the time of issuance of the certificate of
occupancy.
(d) In no event shall installation of curbs, gutters or sidewalks be required if the cost of
installation of such curbs, gutters, sidewalks and other improvements exceeds ten (10) percent
of the cost of the building permit value. In this case, an escrow in the amount of ten (10)
percent of the value of the building permit shall be deposited with the city by the property
owner prior to issuance of a building permit for the improvements.
In addition, the installation of curbs, gutters and sidewalks shall neither be required nor
allowed upon any street designated as an exempt local street in the city's comprehensive plan
nor shall the department require an escrow for public improvements.
(e) In any such event, a development agreement shall be signed by the owner of the
property, pursuant to the subdivision regulations of the city, which development agreement
shall remain in full force and effect for ten (10) years from the date of execution by the
property owner, unless sooner released of record by the city.
(0 Any owner, contractor or developer who is aggrieved by a decision of the department of
public works requiring installation of such public improvements or escrowing of funds in lieu
of construction shall have the right to appeal the department's determination to the board of
adjustment pursuant to section 2-61 of the city's Code of Laws.
(Ord. No. 1996-1039, S 1,7-29-96)
For more information, including the complete City Code of Laws, please go to the following
page on the City of Wheat Ridge website:
http://www.ci.wheatridge.co.us/GovSite/default.asp?serviceID I =678
Click on the Municioal Code link, and then click on the "Code of Laws City of Wheat Ridge..."
folder of the left-hand side (ignore the "Unable to Load File" message on the right pane).
Rev. 5/05
....<~
~'-'" -.j.
/>~tt',-
City of Wheat Ridge
Department of Public Works
Date: 5/3/2005
Emdneer's Cost Estimate
Escrow Funds for Public Improvements
4000 Chase Street (Catherine Webster Residence)
Item
CostlUnlt
Unit
2' wide X 6" HMA (asphalt) Patching: $ 36.00
6.5' Mountable Curb, Gutter, & Sidewalk: $ 21.00
SY
LF
(~ $8.00/L.F. for a 2' wide patchback)
Frontage length for 4000 Chase Street ~ 54.00 feet
Item CostiLF LF Totals
HMA Patching: $ 8.00 54.00 $ 432.00
6.5' C, G, & SW $ 21.00 54.00 $ 1,134.00
I Total Cost for Public Improvements $ 1,566.00 I
Estimate By: David F. Brossman, Development Review Engineer
4000 Chase - PI Estim
~' WH[~? ~,
, 0
- "
U ~
C'O{OR"'~
COMMUNITY DEV
BUILDING INSPE
CITY OF
7500 WEST 28TH /Ii.
WHEAT RIDGE, CO 80033 - (303-235-2855)
APPliCATION
~4-h.A..("\ ~ We \Ps+e c-
c!Ao...s.e.... s+-
Building Permit Number:
Date:
Property Owner:
Property Address:
Contractor License No.:
4oc:e>
Phone:
~W3. "\ \ S .1'-1 \f3
Company:
0\.0\'\;).(
Phone: 3o~. q, S. 7y lt3
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I Buildina DeDI. Valuation Figure: $
I hereby certify that the setback distances proposed by this permit application are
accurate, and do not violate applicable ordinances. rules or regulations of the City of
Wheat Ridge or covenants. easements or restrictions of record; that all measurements
shown. and allegations made are accurate; that I have read and agree to abide by all
conditions printed on this application and that r assume full responsibility for
compliance with the Wheat Ridge BU~'ldi .COde (I.Re) d aU other applicable Wheat
Ridge Ordinances, for work under thi it. Pia b ect to field inspection.
/, / . 4 ""'1-><'
(OWNER)(CONTRACTOR) SJGNED // I DATE ,<'.9
Value:$ i1?i'3b]
Permitfee:$ · :;.<:;;.31
Plan Review fee:$ II e.j. .2>>
Use Tax:$ 31 Db.z.J
Total:$ hit 'I. eo
-I--15-0.oc..'
r-::
(OWNER)(CONTRACTOR);PRJNTED
DATE
""
Use of Space (description):
Description of work:
N"'1I0 f'^<:>DuL~I<...
~
~ITt-\
D€.IY--.CCL,-riof-....\ c~ bX\Sllr--lC)
~-'1I'\t:.
Sq. Ft. added
UILDING COMMENTS:
Approval;
S'f?:;-->:~~:t
I . ...
L~4~:;? 1005
-......:_~-::- -, - -
/Z.ooF.5 /)/.A-7-.JS ~ ~ BE b'~ ~-W
I....'/)/~ ".... S,TE. b.e..,.,..,~~ or ;t/ee:;4:l .. . ~
OK, Al;:!tS/5/.3/0.5" '_SGE A-'m s:~
-,
I
I
I
\u
,I'
(,\:, ~/
pQ~t.(
r
BUILDING DEPARTMENT USE ONLY
ONING COMMENTS:
Approval;
Zoning:
UBlIC WORKS COMMENTS:
Approval:
.e ~ S(d, '(}OJ
-..::.:.. . .--.......-..-......--.-..
....
IRE DEPARTMENT COMMENTS:
Approval:
Occupancy:
Walls:
Roof:
Stories:
Residential Units:
Electrical License No:
Company: 'R.o..... A!UI D T
30S, '13' '!. Sill!;
Expiration Date: 12. .'1.c>!
Approval:
Plumbing License No:
Company: ~GtAC'1 1..Uc:dl
1'&0.2'18.3'1'1'"
Expiration Date: \,.I~'OS
Approval:
Mechanical License No: Ic
Company: liH ~ l-t1 t1 . A c:
30&.<.\'Z.~."'ioS
Expiration Date: \2.. z.~.l>5
Approval:
(1) This pennitwas issued in accordance with the provisions set forth in your application and is subject to the laws of the State of
Colorado and to the Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable ordinances of
tile City.
(2) This pennit shall expire if (A) the work authorized is not commenced within sixty (90) days from issue date or (8) the building
authorized is suspended or abandoned for a period of 180 days.
(3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes
have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one
(1) year, If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit.
(4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
(5) Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written
approval on inspection card before proceeding with successive phases of the job.
(6) The issuance of a permit or the approval of drawings and specifications shall not be construed to be a permit for, nor an
approval of. any violation of the provistons of the building codes or any other ordinance, law. rule or regulation. All plan review
Is subject to field Inspections.
Chief Building Official
~~' ~HE'r 1>/
~ 0
- ~
u ~
C'OLOR"OO
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING INSPECTION LINE - 303-234-5933
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80033 - (303-235-2855)
APPLICATION
Building Permit Number:
Date:
Property Owner:
Property Address:
Contractor License No.:
Company:
(},-+1'1.J2X'NL We\p~?+e.
4oce" C k>..s.e.... s +-
Phone:
303. '1. \ S, 1'-1'+3
O\D\'\.o I
Phone:
30~.9.IS.h4-3
OWNERlCONTRACTOR SIGNATURE OF UNDERSTANOING AND AGREEMENT I BuildinQ DeDt. Valuation Figure: $
I hereby certify that the setback distances proposed by this permit application are
accurate, and do not violate applicable ordinances, rules or regulations of the City of
Wheat Ridge or covenants, easements or restrictions of record; that all measurements
shown, and allegations made are accurate; that I have read and agree to abide by all
conditions printed on this application and that 1 assume full responsibility for
compliance with the Wheat Ridge BU~.ldi Code (I.B,C) d all other applicable Wheat
Ridge Ordinances, for work under thi mit. PIa beet to field inspection.
(QWNER)(CQNTRACTOR): SIGNED ,fA / / DATE 4, '2lJS
Value:$ illi?'-7
Permit Fee:$
Plan Review Fee:$
Use Tax:$
Total:$
Use of Space (description):
Description of work:
~'" 0)..) 1\;'0 DL)L~ R..
(OWNER){CONTRACTOR):PRINTED
DATE
,,) IT f.\
DEI'NDL'" 10(0 ob' bX\.STI to C,
4=m E.
Sq. Ft. added
BUILDING COMMENTS:
Approval:
J
:5r'?-D5
IJ.Pj? ?
_ _ ;._<:- 7 1005
'---, .:.;.. -./, j
-""'......_,"'
'--'::"::.' '-
~
/: .
BUILDING DEPARTMENT USE ONLY
ONING COMMENTS:
Approval:
Zoning:
e',~
'7
j
/
ueLlc WORKS COMMENTS:
Approval:
IRE DEPARTMENT COMMENTS:
Approval:
Occupancy: e- 3 Wails:
Roof:
Stories:
Residential Units:
Electrical License No:
Company:
Plumbing License No:
Company:
Mechanical License No:
Company:
Expiration Date:
Approval:
Expiration Date:
Approval:
Expiration Date:
Approval:
(1) This permit was issued in accordance with the provisions set forth in yourapplicatlon and is subject to the laws of the State of
Colorado and to the Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable ordinances of
the City.
(2) This permit shall expire if (A) the work authorized is not commenced within sixty (90) days from issue date or (B) the building
authorized is suspended or abandoned for a period of 180 days.
(3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes
have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one
(1) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit.
(4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
(5) Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written
approval on inspection card before proceeding with successive phases of the job.
(6) The issuance of a permit or the approval of drawings and specifications shall not be construed to be a permit for, nor an
approv ny lalian of the of the building codes or any other ordinance, law, rule or regulation. All plan review
Is eld Inspe
fficial
COMMUNITY DEVE
BUILDING INSPEC
CITY OF
7500 WES
WHEAT RIDGE, CO 80033 - (303~35-2855)
APPUCATION
Ch. 4+uz..C"\ r"\.JL We 'os+e r
C ~S<- 31-
I ,
j \
T
Building Permit Number: .
Date:
\
\
Property Owner:
Property Address:
Contractor License No.:
40Cb
Phone:
303. <1. \ S, 1'-1'-13
Company:
Ol1.)\'\.j). ("
Phone: 3o~. q IS. 7y1.t3
OWNER/CONTRACTOR SIGNATURE OF UNOERSTANDING AND AGREEMENT I Buildina DeDt Valuation Figure: $
t hereby certify that the setback distances proposed by this permit application are
accurate, and do not violate applica~e ordinances, rules or regulations of the City of
Wheat Ridge or covenants, easements or restrictions of record; that all measurements
shown, and allegations made are accurate: that I have read and agree to abide by all
conditions printed on this application and that r assume full responsibility tor
compliance with the Wheat Ridge Buildi Code (LB.C) d all other applicable Wheat
Ridge Ordinances, for work under thi it. Pia b ect to field inspection.
(OWNER)(CONTRACTOR): SIGNED /~
Value:$ i12i'3(,7
Permit Fee:$
Plan Review Fee:$
Use Tax:$
TotaL$
(OWNER)(CONTRACTOR):PRINTEO
DATE 4,'21~
DATE
Use of Space (description):
Description of work:
N<= 00 fIAo D0LJ:> 1<..
v.; IT f..\
D€/Y'..<D<.-I,fCr---.\ ('(C- bX'Sll~()
ttc'll'\ C
Sq. Ft. added
BillLDING DEPARTMENT USE ONLY
ONINGC~~:r~~:~J ". ~/17/or- .ollJ. (....., U(~..t 1 r kn jrlf
Zoning: \2. \A ".'ot"'j fCt f/f'hi '.W "",,1ItIU I"",
~,('t,I ,'ti.......' (#of "" 1I,~"'~l
Sq.Ft.:
UtLD1NG COMMENTS:
Approval:
A,PR )
,__,,/ 1005
~,_1 ./
""--.1':-....
_._~'-,
---..::
I
!
UBUC WORKS COMMENTS:
Approval:
IRE DEPARTMENT COMMENTS:
Approval:
ccupancy:
Walls:
Roof:
Stories:
Residential Units:
Electrical License No:
Company:
Plumbing License No:
Company:
Mechanical License No:
Company:
Expiration Date:
Approval:
Expiration Dale:
Approval:
Expiration Date:
Approval:
(1) This permit was issued in accordance with the provisions set forth in yourappHcation and is subject to the laws of the State of
Colorado and to the Zoning Regulations and Building Codes of Wheat Ridge. Colorado or any other applicable ordinances of
the City.
(2) This permit shall expire if (A) the woril; authorized is not commenced within sixty (90) days from issue date or (8) the building
authorized is suspended or abandoned for a period of 160 days.
(3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes
have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one
(1) year. tf changes have been or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new pennit.
(4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
(5) Contractor shall notify the Building Inspector twenty.four (24) hours in advance for all inspections and shall receive written
approval on inspection card before proceeding with successive phases of the job.
(6) The issuance of a permit or the approval of drawings and specifications shalt not be construed to be a permit for, nor an
approval of, any violation of the provisions of the building codes or any other ordinance. law. rule or regulation. All plan review
is subject to field Inspections.
Chief Building Official
Inspections will not be made unless this card is posted on the building site
24 Hours notice required for inspections
S.t. :;-G.lc.>ll\43 S
Date Issued : e;,'::J Type
INSPECTION RECORD
) ~1l.11
7500 W. 29th Avenue
Wheat Ridge, Colorado 80033
(303) 235-3855
erln.Reef/on Line l3W. 2~4:9n
Job Address
Building ~enni
Owner .
Contractor
Contractor Address
\.
Occupancy
'K-3
INSPECTOR MUST SIGN ALL SPACES PERTAINING To THIS JOB
FOUNDATION INSPECTIONS DATE APPROVAL DISAPPROVAL INSPECTOR COMMENTS:
~. INmAd::S
Footings/Caissons tu. J liS dC/ ~ //Z r~ c'RE/?'JP /'JM/~
Stemwall \
Reinforcing or Monolithic ~,n{) j( t'(/-;::'/ /H"If- /~L' ~/ -
.,' h NJ!":' t:io"pA'L/Z
Weatherproof I French Drain ". ,J
.,
Water/Sewer Service Lines
CONCRETE SLAB FLOOR
Electrical (Underground)
Plumbing (Underground)
Heating (Underground)
Electrical Service
Rough Electric
Rough Plumbing
NcTestGas Piping
Rough Mechanical
Framing
Roofing
Insulation
Drywall Screw
POUR No CONCRETE UNTIL ABOVE HAS BEEN SIGNED
FINALS
IJeclricaI
Plumbing
Mechanical
Frame /Interior Finish
RO.W & Drainage
Fire Department
;5 Parking & Landscaping 9.1<;. or J
-NOTE: ADDITIONAL INSPECTIONS / COMMENTS ON BACK
OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF
OCCUPANCY IS ISSUED
PROTECT THIS CARD FROM THE WEATHER
u\'l kc r I V1,--lC
t--,VOO C
: cUdrglDlti ~
Die ~
f!.tJ
o - C:/C)S
\]\)Q ~1
...-,-
~
i C [/
<.f
,
,
k~ (1 ~
c^' '"-__
---^"
-MODULAR HOMES-
INCOItPORAT1!D
.2031 e.I.25 FrOfl.... ~o-d. Erie. Co._do IOlt.
nuYCRtl It
.;~[t~., AQOM'55
//p-..,
/ &.._r.J
mrw"y ADCIRC$$
j ('/-'I~A
,,7. ~...11
1.lt1',(,~i
r
C4"f.'
}'I"
.C0'
MAI(~ a..oDl'L A
.1'.. ~ 1/
.......-
( CUXU,,",
LOC:A'ION R.VAUlE THICKNESS TYPE OF--.ATION
CEILING R.
UleIIOR R-
FLOORS R-
nIISI.\:'\I,.,AtJO,'l; /;..-rOR.\IAT/O!i 11;1$ H'II..VlSlIEL'Hr Till-: /lLlIv",.;WTflkF.R
.1.''1 J IS 0/$1."',(1.\0#:1) J,'I/ CO~fFl.I.".\:C.R ,rITlI '1111': ""EDt'fl..". TR..,UH t"UA#,,,t$$Jt)N
Rt.:U: ,-"oRf-SECTIV,V "<11.16.
M___'aw.r
..... AII_ -- ......
werrantle. . .. 01 Ied_
All new homes .... sOld wilh . one 1
T1r wlleels !!!ll! .... ...
"AS IS. "Wll RE IS. with
Time I. of the essenca. .0 buverla' aGr..... to .X...,.... due III
. ._..11011_. .~ In
oblainl a 10.11 on theW beNIt.
I'P- .z -;". -
_.AIl
a,,1I Mod.... Inc.
lnl.(NO.
AIIOUIIIOIIftNQ 10WMOll
_LIIQ.
CClLOlI
Morga~~o~nc.
~ o)L~ .
..
DCAI.SI
-
.>-. YYO _V'76-
...-
,;;o.! /?__
:;&- "', 5
~/
..rOll_
BASI! PRlCEOI_
0P110NM. Eau.IJENT
_TOTAL
SALES TAlI $
NONYAV"'" t: _CAAflE S
,.
_TAll_ "'-011lER
VARIOI/!I FEES .. INSURANCE
t,___
_.AlUIIII~
LESlIUL ..-
55
lIIllI'
3. _..CUII__ zW ..
IlEUIIIERYI'IECONIII1IlINS: ..:.... ,. ;.. .'...
p\..:IIAlIElU;AHNOTTMCE _aEllllIOtl. J1A1lE~ ..,
KEYlI OR !'\ACE Ie THE _ \JlI/1L
MORGIlNTI -,_.
Ie F\ILL. '
-
.;2~. ,?o .CJr~ro
..............-..---_..._~.........
...-..-.......---.........-.......-.....-
........ .................... ............... . .......--..c..
~ ............----...---_...........~...
--......~_....._~~~...tIitt:~
......--.
',-"..
(J ~liy ro-n G"'"
:Ii G~ ~cJ
1Xt(.,;,t>
~ 54' 0'.
..
-
r
'-
t
14''0. ,
VI
Vi
-
<<
,
\II
r(l
1(
CHASE ST
f(EIV'OVk ~~\")'\NCj
'\1<c"~~ A i0D Cl"'kcCC:;f.
];:1(\,:::,TI"-\<1 DglVE:- 'Tb
P,C:rY\AI~
CATHERINE WEBSTER RESIDENCE
4000 CHASE ST
WHEATRlDGE
CRAWL SPACE-MODULAR HOME
30' 4" x 60'0" INCLUDING 8'0" BUILTIN COVERED PORCH
RE-USE EXISTING WATER, SEWER, POWER, AND GAS
DEMO EXISTING HOUSE AND GARAGE
....
~
City of Wheat Ridge
Community Development Department
Memorandum
TO: Building Contractors
FROM: Planning DivisiorJ.tr
SUBJECT: Items to be completed/New Single- or Two-Family Structures
DATE: May 17,2005
Listed below are a few items to consider while finalizing construction of a single- or two-family
structure. Before a certificate of occupancy can be issued for a new single- or two-family structure,
the following items should be complied with:
1. If a driveway is proposed, the first 25 feet of drive surface area must be paved. The driveway
may be surfaced with asphalt, concrete, brick pavers or similar materials. The driveway must
abut the existing edge of asphalt on the street, which may require paving within the right-of-
way. If paving occurs within the right-of-way, a right-of-way permit is required from the
Public Works Department.
2. One street tree must be installed for every 70 feet of street frontage. If the structure is a
comer lot with frontage on two streets, each frontage is subject to this provision. These street
trees must be at least 2 inch caliper specimens.
3. One hundred percent of the front yard must be landscaped, excluding driveways and
sidewalks. The front yard is defined as the first 30 feet from the front property line adjacent
to the street.
4. At least 25 percent of the entire lot must be landscaped. The front yard landscaping may be
counted when calculating this figure.
5. No more than 50 percent of the landscaped area may be comprised of turf. Low water turf
(such as buffalo grass, blue grama grass and tall fescue) is encouraged.
6. No more than 35 percent of the landscaped area may be non-living material, such as rock or
bark. Living materials planted within rock or bark beds may be excluded from -the non-living
calculations.
7. If the landscaping cannot be completed due to inclement weather, an escrow must be
submitted. The escrow shall be in the form of 125 percent of the value of the required
landscaped area.
8. It is possible that the Public Works Department may required either construction of curb,
gutter and/or sidewalk or that an escrow be submitted for the full amount of these public
improvements. It would be beneficial to contact the Public Works Department to discuss the
potential for public improvements.
9. Any fence, outbuilding, shed or detached garage will require a separate building permit.
..
.. 54' 0.'
..
"
.....
\4'''0. ,
IQ'O
j2.EN.CIi' l;:~'~T'N~
11<.(\'~ ,,,,cD (:"'k.1;G~
...- - - --,.,-
1;'>(\ ~:)TI t..\ ~ Dg\\IE: \b
f\e:rYI,lll~
',()
,'I
~
Q = 'D I E-ec:r/O~ 0
~ '{0oF ])Rk1I<J5
,
\II
I(l
<i
CHASE ST
CATHERINE WEBSTER RESIDENCE
4000 CHASE ST
WHEATRIDGE
CRAWL SPACE-MODULAR HOME
30'4" x 60'0" INQ.UDING S'O" BUll-T IN COVERED PORCH
RE-USE EXISTING WATER, SEWER. POWER, AND GAS
DEMO EXISTING HOUSE AND GARAGE
4
o
"9 ! 1.1 U i~~~ 'qZJ~L~:;~~l~),aI
B I II I ~~~ =:= L . 4~L~.~!f:,:I~.
BUILDING PERMIT
.~
Required APprov,aTs;:I;Fii.e~ . .1: .
,,:>,,14\ijr"<
Apllroved Not Required Case 1/ Notes
Approval
..:J
~
o
ok w/ notes
519/2005
..:J
~
o
r-1 a/jh: house cant exceed 35' in hI
see memo
5117/2005
..:J
~
o
indicated on site drawing. Need
Public Impovement escrow for
$1566.00. See attached sheetsl
513/20050
"$#>-'"
..:J
~
~
DEPARTMENT OF PUBLIC WORKS
SINGLE-FAMILY/DUPLEX BUILDING PERMIT
APPLICATION REVIEW
Date: s/~~.s
Location: ~"CO CNt1:sE> S~=I
ATTENTION: BUILDING DEPARTMENT
I have reviewed the submitted application documents to construct a S/.-J&rG6 ;::::'''''~'L-Y .&:s-.I./).sv=
to be located at the above referenced address. Please note the summary comments below.
1. v' Drainage:
a. Proposed GradinglDrainage Letter & Plan required: Yes
b. Lot drainage/grading to be reviewed by Building Division:
c. Site drainage/grading plan has been reviewed and is: _OK
2. L Public Improvements to be completed:
a. street paving/patching: Yes
b. curb & gutter: Yes
c. sidewalk: Yes
If not, the amount of escrow taken: $ I, S 6.6..00
Items escrow is taken for: C. ~. Sw. /t-s"N.tc.:r
" ,
Has Escrow Agreement been executed: (Wlt-i- 8€)es
3. L State Highway Access Permit needed: Yes
No ;>. W. WIU-. VE/i!.It='7"
._ p~o~ 70 C.O.
-=- ,$S(,)/f-NC4:
_ Not OK; refer to stipulations.
-LNo
---.J.L No
-.1L No
(See-I't-TT~~
P~/..;&
esT7~)
No
~No
4.
Does all existing roadway/alley R.O.~. meet the standards of the City: L Yes
If not, what is requested: Jt./ t'-1::.
IfR.O.W. is required, has the deed been received: Yes No
5. /' APPROVED: The Public Works Department has reviewed the submitted material and hereby approves
this Permit Application, subject to the above and/or attached stipulations.
;J.. ";4--/.J.~. -.p.~ A _ 5/~ft;S
Signature David F. Brossman, P.L.S. Date
v
No
6. ~ NOT APPROVED: The Public Works Department has reviewed the submitted material and does Dot
approve this Permit Application for the reason(s) stated:
7. ./
8. Nfl-
9. 1//A
Signature David F. Brossman, P.L.S. Date SITE' i>LIhJ F=b-e.
./ ~se-~ /1-7T~b S~( &DF \
Stipulations attached: --.lL Yes _ No II '1>iiUnNS/
2.AJee:'D f' 1,541.,"0 escA>c..J f'~fJ,e, 7'Z> C.O .
A Drainage Certification Letter is required prior to the issuance of the Certificate of Occupancy (C.O.)
NOTE: Any damage to the existing Public Improvements as a result of this construction is to be repaired
to meet City standards by the Permit Applicant prior to the issuance of the Certificate of
Occupancy.
"J
'~ ~,
__ ~ ~ll _
- ~ -~>J
..
City of Wheel RIdge
~ofPubkWork&
Enl!.ineer's Cost Estimate
Escrow Funds for Public Improvements
4000 Chase Street (Catherine Webster Residence)
lli!!!
Cost/Unit
Unit
2' wide X 6" HMA (asphalt) Patching: $ 36.00
6.5' Mountable Curb, Gutter, & Sidewalk: $ 2] .00
Frontage length for 4000 Chase Street = 54.00 feet
Item Cost/LF LF Totals
HMA Patching: $ 8.00 54.00 $ 432.00
6.5' C, G, & SW $ 21.00 54.00 $ ],134.00
Total Cost for Public Improvements $ 1,566.00
{ f trolL
-w
Estimate By: David F. Brossman. Development Review Engineer
Date: 5/3/2005
SY
LF
(~ $8.oo/L.F. for a 2' wide patchback)
C.D .J
4000 Chase - PI Estim
'~
. .~
~"I
'I
--:>- ~-
"J
CllyolWhool_
Departmenl of NlIIc Worb;
Public Imorovement Requirements
All Site Developments within the City of Wheat Ridge are responsible for the completion of
the Public Improvements across the property frontage(s).
The following definition of "Site Development" was taken from Section 26-123 of the City of
Wheat Ridge Municipal Code of Laws:
Sec. 26-123. Definitions.
Site development. All construction and improvements on any parcel, lot or tract of property
within the city and on any structure (other than normal maintenance or repair allowed for
nonconforming uses), including but not limited to substantial clearing, grading, filling or
excavation, streets and roads, drainage, utilities, parking lots and structures, landscaping,
building, building additions or alterations, parking lot lights, street lights, signs and erection or
moving of structures.
The following excerpt pertaining to Public Improvement Requirements was taken from the
Building Permits Section 5-45 of the City of Wheat Ridge Municipal Code of Laws:
Sec. 5-45. Public improvements required.
(a) Applications for building permits shall be reviewed by the department of public works to
determine whether the proposed construction will require the installation or construction of
public improvements including, but not limited to, street paving, curbs, gutters, sidewalks,
drainage facilities, or other public improvements as may be required by ordinance or the
subdivision regulations.
(b) Ifit is determined by the department of public works that any such public improvements
are necessitated by the proposed construction based upon the specific adverse effects created
by the proposed construction, including, but not limited to, drainage, traffic, street continuity,
curb, gutter and sidewalk, relocation or undergrounding of utilities, street lighting, roadway
construction), the department of public works shall so inform the building official, and in such
event a condition shall be inserted in the building permit which shall require the construction of
such public improvement or public improvements by the property owner and the dedication
thereof to the city. All such improvements are to be constructed in full compliance with the
city's engineering division regulations, design standards and construction specifications. The
cost of any such improvements shall be borne by the property owner, and the construction
thereof shall be at the sole cost, risk and expense of the property owner, subject to the
provisions of any applicable city ordinance, regulations or policies. Subject to the requirements
of paragraph (c) below, failure to construct any such required public improvements shall entitle
the city to withhold any certificate of occupancy.
(c) If it is determined by the department of public works, after consideration of the factors
set forth below that such public improvements may be placed at a later date. An escrow
amount equaling one hundred (100) percent of the estimated cost of the required public
improvements shall be deposited with the city. The cost estimate will be prepared by the
engineering division, based upon current construction costs prior to issuance of a building
permit.
(I) The installation of curbs, gutters and sidewalks and related roadway improvements may
not be required where less than half of the properties on the street extending five hundred (500)
feet from the lot lines of the property in question, on both sides of the fronting street, have in
existence curbs, gutters and sidewalks.
(2) No curbs, gutters and sidewalks shall be required for a remodeling of an existing
building.
(3) Installation of curbs, gutters and sidewalks would be impractical or economically
unfeasible or not in the best interest of the city at the time of issuance of the certificate of
occupancy.
(d) In no event shall installation of curbs, gutters or sidewalks be required if the cost of
installation of such curbs, gutters, sidewalks and other improvements exceeds ten (10) percent
of the cost of the building permit value. In this case, an escrow in the amount of ten (10)
percent of the value of the building permit shall be deposited with the city by the property
owner prior to issuance of a building permit for the improvements.
In addition, the installation of curbs, gutters and sidewalks shall neither be required nor
allowed upon any street designated as an exempt local street in the city's comprehensive plan
nor shall the department require an escrow for public improvements.
(e) In any such event, a development agreement shall be signed by the owner of the
property, pursuant to the subdivision regulations of the city, which development agreement
shall remain in full force and effect for ten (10) years from the date of execution by the
property owner, unless sooner released of record by the city.
(f) Any owner, contractor or developer who is aggrieved by a decision of the department of
public works requiring installation of such public improvements or escrowing of funds in lieu
of construction shall have the right to appeal the department's determination to the board of
adjustment pursuant to section 2-61 of the city's Code of Laws.
(Ord. No. 1996-1039, S 1,7-29-96)
For more information, including the complete City Code of Laws, please go to the following
page on the City of Wheat Ridge website:
http://www.ci.wheatridge.co.us/GovSite/default.aso?serviceID 1 =678
Click on the Municipal Code link, and then click on the "Code of Laws City of Wheat Ridge..."
folder of the left-hand side (ignore the "Unable to Load File" message on the right pane).
Rev. 5105
,
'4
'~ ~~,
~'
---:>- ~~~-
CltyolWhoot_
Deportment of PublIc Work$
Date: 5/3/2005
Enl!ineer's Cost Estimate
Escrow Funds for Public Improvements
4000 Chase Street (Catherine Webster Residence)
Item
Cost/Unit
Unit
2' wide X 6" HMA (asphalt) Patching: $ 36.00
6.5' Mountable Curb, Gutter, & Sidewalk: $ 21.00
SY
LF
(~$8.00/L.F. for a 2' wide patchback)
Frontage length for 4000 Chase Street ~ 54.00 feet
Item Cost/LF LF ~
HMA Patching: $ 8.00 54.00 $ 432.00
6.5' C, G, & SW $ 21.00 54.00 $ 1,134.00
Total Cost for Public Improvements $ 1,566.00
Estimate By: David F. Brossman, Development Review Engineer
4000 Chase ~ PI Estim
~
~
~
..J
..J
SO
zO
::5>
0..0
o::Z
o~
0..J
..J..J
u.::J
enZ
-Z
rl- ~
..J
00..
I-l-lO
enZO
WWO
t!)~N
ZW"":
~(/)N
r<(r
<.:lIDO
>-eno::
zr<(
<(1-:2
I
~~ I
O~ ,
>-~~B ': ~ ~ i
:~~8~ I '128~ ~ i
cn~ i: :!~~..nl
:~~g~ r 11-'~1IC .....~
;~$~~ II ~~!I ~'f
!@t~8 ! I ! ~"g ~~ I
;a.IlI~~ !. I ~~ ~
,.,~~~ ~~ i ;:;u ~
, -~f3~~ 0
. ~ oail
nI/?O '~
.
.
.
,
,
,
,
.
,
,
,
,
,
,
.
,
,
,
,
.
,
,
,
,
,
,
.
,
, '
, '
, '
, '
, '
, :
: '
i i
, ,
, ,
, :
.
:
,
,
,
,
,
,
,
,
,
,
,
,
,
:
,
,
,
_ _____ .._.___ 1
.
E -:-~~~-~~:~-,~:--~~~:~:::~.~: ---:=~~~~.~~:~~::~-: =]: ----
.--------- ----------------------.-------..
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
:
,
,
,
,
,
,
.
,
,
,
,
,
,
,
If-- -. _u_u.. -.. u__
,
,
,
,
,
,
,
,
,
L______________ ___.
-------r----- ----. ..---- -._-
,
,
,
,
,
,
,
,
,
--_._--~-----------_._- ---
00
~-------------------
,
,
,
,
,
.
,
,
,
,
,
,
,
,
,
:
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
:
.
,
,
,
.
,
,
,
,
,
,
,
,
.
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
- -----~--------~._----
,
,
,
,
,
,
,
,
,
,
C',
"-'--1)"1
'.J
,
,
,
,
,
,
,
,
,
1_&'
+-_._........J..1
'.J
,
,
,
,
,
,
,
I---:t;
L.J
,
,
,
,
,
,
,
.
<>
';
'"
<9
10
0>
'"
,
,
C',
_---0 Jr'
'.J
,
,
,
,
,
,
,
100
..
,
,
,
,
r.l'l
"-"1 J,. ,
'.J
,
,
,
,
,
,
,
,
,
,
,
,
,
,
------ +- ---- ~-------
~
'ON )(\1:1
".-- ,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
_:_~~
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
~
7
o
~
u
it
6
()
~
o
'"
.~
III
0(
;;:
0(
o
;
xi
~,
aNI
O~I
8
:2"'!
~~I
lOM
t;-~
lO"
0:::
c
~
o
o
~
~
o
N
I
LL
-i-
I
I
. ~I
I'~~~ ~
I ~~i~
~l.l!'b
85~ ~
0..1
5: 1r~!i <b.
l'6l!1S>i
~all: ;
~!g~
!!!!jIOIIt.
"'~H
~ .0
~ ~u
o.
-.
~S
f
...
~(/) ..
a
roo ..
z
~S "
0:
~
00 oJ
~~ ~
..
.,
a;
~ ..
0:
W
ffi
0
0
R
~d 9~:~O NO~ 90~12-H\I~
~t
I-W
I- ~~~ ~ ~ ,
.z1.~!! :5 l: l
-:8" ~i3ffii!;
'f~~~ 2~to~.
c..~~ t:~~Q~:
z~~~ ~~~!:
~_t.~~o- 55'Ji ~~
u... w~~.....'"
U).Wl.) lI...iilR'!
wlfIlI"o <f>lll~ ~
~&:i~ ffi ~o ~
'i!<,~ a;:< 0
-~~ ~~ ~
~ QUO
OIlED 'd
r
-----t
----- ....oc
ii!
OJ:
Wo
ilia:
Ei~
o
:Ii
-
0'"
...: =...1
-
~
~
!ll
Cl
Z
Z
o
~
8
N
Cl:;E ~
~O
>0 ~
::;OC n !1
!;
:r
~
~
:<
!l
..
~
!1
~
~
~ .
l-
N
!1
~
m
~ :'l
..
!!!
~
:0:
~rnl
~ J i-.--
~ :.~
~ @!I i
~j-
~
..
N
'"
;t
:;E
o
o
OC
o
W
<Xl
. ~
!
..
l;
.."
'"
;t
~
o
o
OC
o
W
<Xl
OC~
wO
1-0
cnOC
<(0
:;EW
<Xl
..
.
4
~-'--:Z:-S~
---;:
,,",
_' I
~
...
~
I-
"
w
~
!1
~
~
"
N
~
~
~
o
;:;
,-:
'l'
't"""
o
...-
I
tieL
i <( j
.----IT
I :
J~i
~ :) ~
.. a.. ,-
g~ n:: .~-
:2\5 0
.q-~ 0
LOn .J
'7i& I.J..
to><
C,~
i.J
c
o
~
- ~
..
- ~
N
-~
..~
._~
_w
-n
I-
- n
w
-n
-ll
t
I
~ ~
I- -
., .
~ !?
4:: ~
~ 5
c w
'"
.-
"
.~
-::I
I ] Ii
--' J~
.- J ~~~i
'w~"
!Q...~
u...zJr is
j!iQO>
1l~!'
f~~!
)-1t.!S!
~f3 Q
I-,"~
lUzf;/1l'
[.a
rm8
G.:r
~i
-l'i
..r;
..l<
m
-N
.
-N
.,
Z
9
~
o
;;
o
o
>
I-
..N
. III
~
N
- .
N
n
~
..~
-l<i
-~
--~
~
-1'
-,0
is
m
.
;:
..
o
-~
_n
--~
~
--~
-m
G
-I-
~cn !
..
..
~S z
,.
a:
~
(1)0 uI
~~ ~
fI)
a:
~ ~
,.,
_w
-w
-.
-n
-N
'ON Xli.:!
Ud 9V:VO NOU 90-IG-HliU
Ii-
fil;l
w~~
-1->1;;
z~~~
- ll<
;!l'i"'i
.!::I-j!:...
:~1i~~
...Jm...,ii:
:iS~~8
'wmft:c
1Q.1l:~Z. .IX"
00111%0(( IU
::g~ ffiS
~lr ottfie!
:t W~<
... 000
Oll60 'd
w
. '
s ~
~81li ~
S!~i gi?
~~w ~
;Ji1~t><
. :;I~JI ~6
o:i10o...
}t'a:F ;t
(lJU'~~
~U~
C
/---------.-------.---- t
I .r.ot ---------.---.-
"
~
OJ:
M!o
Wa:
>0
0"-
o
.
~
il N
N
Cl
c ~-<r~- -
~
z
6
'r
;-
~J N 0
0 0
, , 0
0
,
N
~ l-
II s::
~
ill
II
:lit
~.
~ I!
~-=,,~:.
~
'- --------
---I
,
,
,
.
,
,
,
: <9~
1~~0
Y">o
::::;0::
~
~
-'
"
".ril.
~
s ;;
~
il
~
~
..,
!if
::;:
.A~o
yO
,0::
.0
'W
'm
II -Ii]
~
~
..
"
-"
~
N
N 0
N
~
-_.~--- I
,
o::~ !
wO :
ti~-?"m-)
<0
::;:w
m
W_~i
~
~
~
i"
~
'"
~--..j:Si--'--+---
~
- ---,J
.z-,Sl
l'
--~I -:'1
UI - ':J
~
c
~ - ~
~ -~
~
..
ill
..
M
N
e
f
!'
-~
s
-~
T""
o
~
I
\in.
'"<(
,
on
.
.
z !
~ :5
w
Qi' a. ~
0:: n
08
:2lli 0
oq-w 0
lC):: .J " ~
t-;-~ LL ~
lC)~ ~ ..
O~ , ~
ro
" z W
w W .
u E: ~ g
0
, o- n
."
- 'J
_ _~bz
!j~~"
li'r~t
~ zfl?.)
is 8~~~
~ ~D~!
~ <El.
8 >0 ;;
~~~.
, t;;h~
~~. .
o .0
a::.o~
~~I
f
o
~
-M
-N
. M
.
N
.. .
..~
-\I
- ~
M
:;;
<0
M
..l!l
- ~
-.::J
up)
-r;
..re
-:?j
- ~
..~
m
N
-;0;
-. ~
-~
uN
o
-N
.. ~
-~
-~
..:!
m
<
~
-~
-~
-;?
-0
-c
-~
~oo i
m
'"
~S z
'"
0:
>-
(1)0 oJ
~~ ~
!!l
a:
..
~ 0:
8
0
0
III
'ON XI1.:1
~d 6P:PO NOU SO~IG-HI1~
I
<9
::J
o
0::0::
IW
t-I
Dt-
Wo
ro>-
:2ro
::J
..JW
o.t-
Oen
Wz
roo
ro
::JO
t-w
en I-
WW
0::..J
<~
eno
0.0
Ow
O::ro
o
0::0
WI-
5:0::
wO
enO
o!l~
OOw
<I
<91-
~ti
i '!I~~~ ;1. ~ 3
,1-< lJ . ~:r
;Z~ ~ ~~.
'[i- 1: 0: ~ 0
:D..~!as ' Ii! =~9
.t:.~~ . I !i~~ a~
Z).::Ii .:;) .
::>~~. \, I t j; ~; !
,<....w~~ I: ; "i!i~ ~~ I
.-U~ll . lI'~" t
;~~m;!a 1; ;sffi~ ~
'n. >z . I ~u r;
'(I) I~<( '101 <
%,,~ .j\
-~Ii' !'l{;~
~ ~a~
t..
01/01 'd
..
'"
'"
Uw
w....
.J<
W s:
-=I~ L-'
1 ~T:. t"=r:D:E.E'::'l
~
'"
'"
.O<:NI
.OlNI
----------------
-------------- -.
: _ .-.o-r
_..
'ON Xli.:l
T""
o
T""
I
~(f)
~
'"
,
,..
"
'"
0;;
00
:2~
<;till
If)..
t;-~
l{)X
at!
en
W
o ~
z 1;
< a
0:: ill
t- ~
Z _,,___
W
UJ
o ~
ft ~ ~
W ~ ~
en ~
~ ~ ~
t= 0 bl
:j
w
n
o
"
'"
~
o
~
U
:::
"
o
.
,
,
.~
. -- 1}
- - il~~
Q~tI
~gp
85~ ~
~~~;
>E2 -
~~~~
[jjl1D~
Pl"
~h~
.~I
I
t-
~
<
w
'"
"
~
"
Q
o
d i
~~!l!
~~ ~
~tI: ~
f
~~
l:t
Wd 6~:~O NOW 90~IG-aliW
~i
",0
}-~:;;u
z~ZY.!
~.-8!::
Q.~!!!!c
.....Lrf.
z~~i
~:J~~~
r:l5o
>wu
~m::~ 'QO:
(I)~~~ '~
-8.~l?~
IX.~ <(~o(
~ ~uo
~
~ ~
gffi ~
h5~"
2ii~~a
. :'~tt z"
~"W.~; :
. 00 lib.
w::iO ~
~ft!to <i!
~il ~
o
~! It .' Ii
n I~ .J U
:l~
~; ~ (-:. I
h If hi I
~ . U i II
,- I II II i i I
".
',*, ;
,q < .. ~. -I i
i~ ~ ~ II
~l i I I it -ih i
UdUh
I I
.:, '" '0 - <D il~ iillll
z
.u 19 h! hi
ill tf ]~
~ 4UiJil
5 .~~ ,~
,~~ !I". Ii
g "9 .1 !~ ~t~ [; ~~ i Ii
c.> l, F i~r ~H~h -'
w .
~
u.. ~ '" 'co ,.
ill!!1 nnili
! ~ :t !f ! i 1
i ~ It " f1 ~ =,,:!!:';I'" ..
~qHn :dll!l
'" t
~i...n ~ .. ... $I q III C
0
\il
UIHU !lHIII
!I , ! ! tis
I '" .. 'A Iil :- ,., = 'I: ~ .. H .
[~HH HUdl
, .. - .. - I< " \!I
R -- - . -
01/1>0 'd
U'=~N r; ':11 ' ~-"--:::F..33El= L='>
, ,
, ,
, ,
: I __ __ ~_ ___
N
(') ,
~~u___m J
Ci
;.
z
w
GO
f-
S2
~
lil
c
l'li
o
,
,
,
a:~ :
wO '
ti@~_._._:
~fil
<Xl
c
~
.
N'
. ,
,
,
~
~
::;;
1'8
,a::
,0
III ; W
-~----------- a1
~
~
--------1 ~
,
: ::;;
'--'9-"8
a::
o
w
LD
1
,
,
,
,
,
,
,
,
1 C>:;E
.l~~o
y>o
:::;a::
~
-. I
~
0
~
I
l~i 0..
0" W
x
w ..._-.... ...
z
<( ~
...J
x a.
~ ...J ~
o~ <( <<
08 () .'0 -..
:2[\ 0::
~" ....w t>
10::: ~
~ ~
"'I~ UJ ~
It)X ...J .. "
o!:: W ;. !g
m
~ ~ ~ "'
" w "' ~
0 J ;l;
0 1=
. ~ "
-' ~I
g\ 1~S~f
w~.
,g~~~
I I~o.
~" o5~~
g ~~I~
~
a I~i~~
0
~ ill!l
.~ 1(Y. !U
o.lll~
~ ~t
,
.. .- .. -
~. ~
w
'i <<
!i
0
;
/"", am
..
; ~~ z
..
'-./ e
oJ
~~ ~
..
..
..
~ ..
~
g
t:l
~
,
~f;
'U
'ON X~j ~d LI>:I>O NO~ SO-Il-~~~
'"
~ e
01/90 'd
E>
" -,
'"
>
G
:"
,
~~"
a @
e
>T
>
>
..
~
,
~f'
a @
G
~
"
'ON XV:!
!;?~S'
~~ .
...~!:
~>fj~~
.~~.,;
,~. "
~"!~~~~,.. ,.
. ~.. "..',;:...
.
- ' -
~ ~ r;: ~.. :
;,!';'~"3~'ft 1..
~
~
,.., ~;." .. ii "" ~
J~j::"~"" ~:.f.
.. -'.. ~:; il
!>
~~&~ ~
...:;::~"~ h
., ~I ,_, J '" l~ ~
. " .
.... ::J~llt~~::'Illl""
~... Will
w 1!;';;~lIIU'.!:~'
<.? g . '.' , ,.,."
~~ii;ii~~it~~
IU'- n.... j
z&
~~ ~~r. ~:..
~~. ~""~fi:
Cl~~~~:.:"J;.~:.~~
...;" ..~ l'::.~:e *
~
o 99
g:s oj ilCll(
[~ ~ ,.
~~~t!!~~P.U~~
~~~~t!.'r.:=~~
... ._ ," 3. ~ 8
1.. ~. k~' ~...
:::~; ;~:l hh:':~
- ~... :;.:
~
~ r:n
"'rf9~~~~ <i.
..:P.:iSd~~~ ~
I >~Hh,...i:. ~
.......,............
5
~
~
~!j3 ~ ~>_.'
~ Ii ; D
'" 9.g ~ ~
I:!! ~ &~. ,!j
o .. lIlb ~ l!;"
z I!~I ~ "~
,,~. . Ii.
z.5 'Iii!' ~ !!I'"
~ !~tii; i ~
~ iUU i~ i I~
.18.~ it ~ ~^
~ih~ I" · ~~
~il~~~~~ ~ ~~
~i9~~~~m
~"BKg~l. .
~.... .-l ;; ".
~
o
~
I
,0...
~o...
~
~
9
Z ~
<( 0
-I i"
~ ._~
~ w
o . ~
~ 0
In 1-
> b
~ ~
. w
~ ~
I
~
ON
~a
;1;~
".
, ~
10"
or.t
llJ
n W
o "
:!! i=
- it
- ...Un
~ I~h~
~ I~II!
~ ~ji~
&~1i~
I ~o.
- -~ ~~I
cool
~~!I!
.f3 E ~
~t:r= ~
~!
~
Wd g~:~O NOW SO-IG-HI;IW
~u
gi
1-~~8
'Z~~22
0:-8'=
'o..l'(CII!i[
l::~~~
3S~~
'3~w~
@>-~~
Q..m!;~ '0: :
[Ow];'" w
'LOlE oc::i
-~i! ~~l!!
t: oG~
~
~
.-
Ol/LO 'd
'ON XII.:!
;::;:
W
I-
({)
>-il!
~i!
00
::::>~
o~
0'"
..:8
>"
:r:~
~
c m~
~ li~
~ ~~
~n
~ g\S
;;J. ~~
!.2 ~~
~ ~w
o a;
UJ ,t-
::E.
~~
~~
~ ~
w
e
nh;
I'>ini
~;/15~1;
! ~lji~i!;
811~i~i~
h~ ~;;~ ~
-I!; ~ 51;:!l'! ~
!~~;.:!;;ig w ,. ~
h~~~i5 f ! ~
~; ~h3i
IijHiiii;l!!i
...........
'"
'"
...
"
~
o
,.
m
~
iil
z
o
<.>
~
i"
~
<.>
~
'"
'U
7-
'"
in
...
"
'u
~
~
!2
'"
-- --r-
-r-I
~I
I I
.. 0.. i
ill 2 ;
" ;
w I
--ri- -
I ~ .
~I 0.. ~
<:( I -J w
o~' c;( ~
011 () c __
511 z
_0 <( ~
;}1;~ I ~
t-- U ~
,O! ill w e
lOX >-
o!:t ~ fa ~
'o-:L Ii ~ ~
o ~ ~ <
~ .: 0 ~
! I I !
I I \-II.I~it
II ~~H
III ZQl!!:>-
~, ! 85i.
:i I ~~~~
u ......iffi...
~ ~~~ ~
;t ti....8~
; I ~Ih
'I II g: ~\~
I ::i'
:.~
I-t
<I
w
w
~
o
~
~
i ~
~ i ~
11 I
~~!
~S 1~
oO!l!
~::r= ~
i2
~\I
~
I I I
Wd av:vo NOW 90-IG-HIIW
I I 111 I
~ iii
~ ~~ ~ iii ~
~ r!
o !'" 3 l!.ilI ~ fatll
;z: . ~ liil
w ~;~S~~ I 1 [
~I I l!> f ~~ 6! ~S
w ~ ~ i!s~
~ ~r
g ..; IU ... l!; iii!';;~
. : I ' ~ dhi .;~.
,'-~~ ,i ~ ~ i (1)0
zx~" "8~. ,
'g:- " '. I ~ ~ I g 1~~UI~il iii ~t:r:
i~~~~ ; i ;~i,ni ~
.Z~O~ 1':;) &Z,",: Z ~~~!ll r~ "
~~i~ I! j~"~ni ~ ;:;Bi,,(i!! " ~
.. 8' (j~ I If ~ ~
:G . jr. l- ~ ~
;"'~"D ; I ,"iliiJ ~ w ~H~il1<8l!l\ , 1i!
"ll'~~ i" ~ I ~ ~x ~~~~~~~ ~ .-
.(f)Ul ...,
, ::tl:J!i lr~ I Q ~~~l\gl~rL I I [
. -~~ ~~ ~ i -- !l~\'i ~n;/~
.... QUO I ....,..;-
, .
01/80 'd 'ON X\I.:I Wd 8V:VO NOW SO~!2-M\lW
~
o
~
!l'
~
::;;;
W
I-
en
in~
1-"
oli
:::>F
oil
II
0"
<Cv
>~
:J:~
'"
'"
W
I
b
>-
m
~
..
15
<>
w
::l
<<
i
<>
'"
<>
ill
Z
'"
Vi
ill
<>
ill
Z
"'
'.!l
'"
~ !!i _
:;: i~ ~~
!il~ i;'; 6~ iiR
l\~ ~!i ~
'. ~ w t;
.....~. -' g
~;a 8 e-o
t>~
~ii
~O'
d
T""
o
T""
J
,c a..
m~
I
I
I
/:
..
W
ON
08
~l'i
'\t"
<O~
~~
<ox
0:0:
. -. ~ -Y". .
I
,
I
z
::i ~
^ "
u.. B
.J '"
<( ,.
() ~
z
~ ~ ~
u ~ ~
w ~ ...
~ III ~
" ui
~ ~
o ~
~
w
a
a
"
w
'"
"
~
>
o
~
~
.
i5
o
~
a
. ~.
.("&
03;t
~~",
iLg~Zi
0>'''1'''
o'~ll!&>
Dl)~~
~ht
~~H
!jj~~"
1~1~5
lltlj'!
Q. ~''''
I ~t
, f
I
~
~
"
.
.;
o
i
ll!
if
~
<(
'"
..
f4
N
I
.. L()
..-
~
I
o
n
N
I
"'L.()
-.:--
15'-9"
CRAWL SPACE VENTS
12' -8"
15'-9"
A
52' -0"
PATIO
I
I
15'-10"
CRAWL SPACE
13'-0"
13'
FOUN[l)ATION PLAN
REFER TO MANUFACTURER'S PLANS FOR FDN. BLK-OUTS,
AND OTHER DETAILS. VERIFY ALL DIMENSIONS.
4" 4"
DETAIL NO. 1 0
BEAM POCKET DETAIL
15' -9"
12'-8"
8' _0"
@ '1
~
IN
vV
SECTION A
---
STL 8M TO MANUFACTURED
HOUSE CONN. OET.
x 1
D ~11 J\
~~ z
~o ~
a....t:t:::
~i 9
~r-- n
::iCD
DETAIL NO. 8
SECTION-2A
ACCES~; WRAP DET.
UNOA ION -TYF)
SCHEOUL
E FOUNDA O~j SOiL PRESSURES
REMARKS
A
: RP DRAFT.. SF
10521 S. PARKER ROAn. SUITE F CHECKED BY: RP
PARKER; CO 80134 DATE: 03/07/05
PHONE.. (7 20) 842 - 11 0 1 ~JOB~'.-NO"~-~'..~:io-1-4"60'.~'-~'.-
SHToNOo 1 OF 1
G
NOES:
RA
h
...... .
10.
~ .~,
I I).
TfIEAMPERSANDGROUP
FOUNDATION PLAN F'OR
4000 CHASE STREET
WHEA TRIDGE, COLORADO
S L11C1.
GEOTECHNICAl, & STRUCTURAL CONSULTANTS
C-..J
I
lr;
"""-
r-------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
7'
~
I
r------ ----------------- --
I
I
I
I
I
I
I
I
: CRAWL SPACE VEN
I
I
I
I
I
I
I
I
I
I
I is
52t -0"
I
1-0
D
CRAWL SPACE
A
7' -6"
N
I
L.()
....--
I
I
I
,
I
I
I
I
I
L__________________ --- -- --------
I
I
I
I
j
I
L__________
8'-0"
- --- '-_._-~,
r
..,
,
"
.J
.--..-- ------- -----------------1
j
I
I
I
I
L
7' - 6"
7'
COL. FTG. PAD SIZES
40I$SC). X 12'~ DEEP
FOUNDA1"ION PLAN '1
REFE:R TO M,ANUFACTUREf~'S PLANS FOR FON. BLK-OtJTS,
AND OTHER DETAILS. VERIFY ALL DIMENSIONS.
7' -6"
CRAWL SPACE AC ESS
I
o
0::::
o
0...
o
W
~
W
>
o
o
COL. FfG. PAD SIZES
J$SQ. X 10n DEEP
r
I
'f'
L
..,
.J
r
..,
7' -0"
L
.J
2A
I
_____________~_J
NOTE: WE S}{O[lLD BE CALLED FOR COMPACTION
INSPECTION A,ND TEST PRIOR TO FOOTING }>LACEMEN1'
P
I
D ETA I L NO. 1 0
BEAM POCKET DETAIL
COL. FTG. PAD SIZE$
36nSQ, X JIO" DEEP
~91
ivY x
SECTION A
STL 8M TO MANUFACTURED
HOUSE CONN. DET.
x
N
D ETA I L NO.
8
ACCESS WRAP D
8"
. )
l--
W
W
LL
tf')
z
~
8" UNLESS NOTED C
LJt\~ L J
.E'
S CTION-2
FOUNOA
PIEr~~S
BEAM
N TYP
CHEOUL
TYf:)E FOUNIJA TIOj\J SOIL F)RESSlJRES
/A
REMARKS
15~OOO Ml~)(. END 8E,l\J~ING
"j PSF SiDE SHEAf~
~AIN~ LOf\D
DIAMETEF~
LE/\ST 18 FT,
ANCHOR SOL TS
Df~~ILLED A ~vHN.
PIEf~S
MIN.
VOID ~v1A'TEF<IA,L
OF
GE~~ RAL. NO S:
"I
L
I~" .
5.
7.
8.
9.
1 '1
i I ~
12.
THEAMPERSANDGROUP
FOUNDATION PL,AN FOR
4000 CHASE STREET
WHEA TRIDGE, COLORADO
D S:RP DRAFT:SP
1 0521 S. PARKER ROAD. SUITE F CHECKED BY: RP
80134 DATE:
GEIlE leAL & SUICTlRAL e..SlLTANTS
PARK'S ENGINEERING, LLC. 10521 S Parker Rd. Suite F, Parker CO 80134 Phone (720) 842-1101
PREPARED FOR
THEAMPERSANDGROUP
2305 E. ARAPAHOE ROAD, SUITE 113
CENTENNIAL, CO 80122
SUBSURFACE INVESTIGATION
OF
4000 CHASE STREET
WHEA TRIDGE, COLORADO
REPORT No. 011352
MARCH 4,2005
GENERAL
This report presents the results of data obtained during the subsoil investigation of 4000 Chase
Street, Wheatridge, Colorado. This investigation was made to determine the type of foundation
required, allowable bearing capacity, ground water conditions and any problems that may be
encountered during and after construction.
SITE CONDITIONS
The site is currently occupied by existing house. It is our understanding that the existing house
will be removed and replaced with a new single family home.
FOUNDATION RECOMMENDATIONS
A satisfactory type of foundation system will be drilled piers and grade beams. The piers are to
be 10 inches in diameter, at least 18 feet in length and drilled a minimum of 8 feet into firm
bedrock. The maximum end bearing pressure is 15,000 pounds per square foot, the side shear
resistance is 1,500 pounds per square foot, for the portion of the pier in dense sand. A minimum
dead load of 15,000 pounds per square foot is required based on pier end area or as high as
possible. The recommended diameter must be maintained at the top of each pier hole (no
mushrooming). The drilled pier holes shall be cleaned of all loose material and filled
immediately with low slump concrete to prevent slough of loose soil or infiltration of water. The
concrete piers shall be reinforced the full length with two No.5, grade 60 rebar. A void form of
4 inches shall be placed under the grade beam between the drilled piers. Foundation walls
should be well reinforced, a minimum of two No.5, grade 60, top and bottom and No.4, grade
60, at 18" on center each way, inside face of foundation wall. A representative of this office must
conduct an inspection during the drilling of the piers.
A alternative satisfactory type offoundation system for the depth of two to six feet (2' to 6') will
be continuous concrete footings. Footing foundations should bear on the undisturbed natural
clays or sands. All loose and disturbed soil shall be removed before pouring the concrete for the
footings. These footings should be designed for a maximum soil bearing pressure of 1.000
pounds per square foot. Refer to foundation design for footing size verification. All continuous
footings supporting perimeter concrete foundation walls should be at least 16 inches wide.
Foundation walls should be well reinforced, a minimum of two No.5, grade 60, top and bottom
and No.4, grade 60, at 18" on center each way, inside face of foundation wall. We recommend
reinforcement sufficient to span an unsupported distance of at least 10 feet. The exterior footings
shall be a minimum of 3 feet below final grade for frost protection. Some settlement may occur
with this type of foundation system.
If soils are disturbed by demolition operation, soils should be well compacted, a minimum
of95% standard proctor density (ASTM 0698).
LATERAL LOADS
Below grade walls must be designed for lateral loads. We recommend the walls be designed for
an equivalent fluid pressure of 45 pound per cubic foot (pct). The recommended design pressure
does not include surcharge or hydrostatic loads. To reduce the risk of development of hydrostatic
pressures, we recommend installation of a foundation drain as indicated on Figure 4.
SUBSURFACE DRAINAGE
The installation of a foundation drainage system is required for any habitable space below grade
level. See Perimeter Drain Detail, Figure 4, for a suggested method of installing this foundation
drainage system. Ground water should not affect or be a deterrent to the construction of this
house.
FIELD AND LABORA TORY INVESTIGATION
One (I) exploratory test hole was drilled on March 3, 2005 at the site shown on the Location
Map, Figure I. This test hole was drilled with a 4-inch diameter auger. At specific intervals, the
drilling tools were removed from the test holes and soils samples were obtained with a 2-inch
diameter spoon sampling tube. The depths at which soil samples were taken and a description of
the soil encountered are shown on the Logs of Test Holes, Figure 2, and the Summary of
Laboratory Testing, Table 1.
All soil samples were carefully inspected in the field during the drilling operation. These
samples were classified in the laboratory through visual inspection and testing to determine the
pertinent properties. The natural moisture content was obtained from relatively undisturbed
drive samples of typical soils. Sieve analysis and swell-consolidation tests were performed on
typical soil samples, see Figure 3.
SUBSURFACE CONDITIONS
The subsurface conditions encountered in the borings consisted of silty sand and clay overlain
sandstone bedrock to the depths of the boring, 20 feet. Groundwater was not encDuntered in the
borings at the time of drilling. The results of sieve analysis and swell-consolidation tests are
presented on Figure 3.
DESIGN AND DETAILS FOR SLAB ON GRADE CONSTRUCTION
The natural soils appear suitable for the support of exterior and interior concrete slabs. It is very
important for the moisture to stay constant during the construction process. When sandy soils
have an increase in moisture content, they may consolidate and settle, potentially lowering and
cracking the concrete slab. When clayey soils are exposed to an increase in moisture content,
they can increase in volume resulting in movement and possible cracking of the concrete slab.
Experience with similar soil conditions has shown that the following details help prevent damage
to a concrete slab. Experience with similar soil conditions has shown that the following details
help prevent damage to a concrete slab:
2
I. The slab must be placed directly on undisturbed natural soils, or on re-compacted
soil. Do not place a gravel layer beneath the concrete slab.
2. The floating slab must be separated from the foundation or utility lines to allow for
independent movement of the slab. A positive control joint must be provided at the
junction between the slab and foundation walls.
3. Control joints must be provided in the slab to confine cracks to the joints and not in
the visible area of the slab. Control joints must be one-third the thickness of the
slab. The maximum slab area shall be 200 square feet. A maximum dimension of
16 feet in any direction is permitted.
4. A minimum void of 3 inches shall be provided at the bottom of all non-bearing
partitions. Drywall or paneling shall not be placed within three inches of the top
surface of the slab, allowing space for upward movement of the slab.
5. If a hot water heating system is used, the piping should not be placed beneath the
concrete floor slab. If a forced air furnace is used, a three-inch flexible connection
should be installed between the furnace and the duct.
6. The soils that will support the concrete slabs should be kept moist, but not wet,
during construction.
7. If the builder or future owner provides decorative gravel or bark around the house,
see Foundation Grading Detail, Figure 5, for an acceptable method of installation.
This method will prevent ponding of water near the foundation and provide for
proper drainage away from the house.
SURFACE DRAINAGE
The backfill soil around the building should be kept moist and well compacted to prevent future
settling. Controlled puddling of the backfill soils is not allowed. For proper drainage, a slope of
10% (6 inches in first 5 feet) away from the foundation in all directions is required. This slope
must be maintained for a minimum distance of 5 feet. The future owners are advised to
immediately fill in any settled area near the building to eliminate containment of water. Down
spouts must discharge onto four-foot long concrete splash blocks or into metal gutter extensions
to direct water away from the house. The future owners should be cautioned regarding the
installation of a lawn adjacent to the foundation walls. Lawn irrigation must be more than 5 feet
of the foundation from the foundation walls to prevent wetting of the subsurface soils. Lawn or
plants within 5 feet of foundation walls should be hand watered and this watering kept to a
minImum.
LIMITATIONS
In any soil investigation it is necessary to assume that the subsurface soil conditions do not vary
greatly from the conditions encountered in our field and laboratory testing. Our experience has
been that at times soil conditions do change and variations do occur and may become apparent at
the time of excavation for the foundation system. If soil conditions are encountered which
appear different from the test borings as presented in this report, it is requested that an engineer
3
from this office be called to inspect the open excavation. This inspection service is not a part of
this report.
Our professional services were performed using that degree of care and skill ordinarily exercised,
under similar circumstances, by reputable geotechnical engineers practicing in this or similar
localities. No warranty, expressed or implied, is made. We prepared the report as an aid in design
of the proposed project.
Should you have any questions or if we may be further assistance in this matter, we are at your
service.
Sincerely,
PARK'S ENGINEERING, LLC.
~tMkj.
4
6 SOIL TEST HOLE FOR BUILDING
EXISTING HOUSE
~
--
-
6 TH#1
4000 CHASE STREET
^-~--.._-- -- ------ -- '---._ __ __.~'"__ _ _'_~~_m.______ _.. _____._____
PARK'S ENGINEERING, LLC.
.~~~~. ...~ ~~ ~~.__.._~~~_..~-~_.__._~~..._.~.._~..._-~~-.-T.~~--~~~ ...... .~.~._~-_._~-~_._.
u..~ Of!.t!.T J(!N_ MAFJ__~_____~__._L DA!~:~08!.~4/().s..~~___
i JOB NO. 011852 I
GEOTECHNICAL & STRUCTURAL CONSULTANTS [...---~_._"------~_._._.. .~.
I :
1 FIG. NO. 1 i
_,.______.__.__~..___..,__,_ ... ._._..,.__,__~.__~~~__._~__.m:
<::
L
.Q
~
L
"
.,..;-
'"
.0
E
-0
<::
o
r.n
o
f-
I
r.n
f-
~
<::
L
.Q
...;
.,..;-
'"
.0
E
"
'"
E
'"
'"
o
-'2
>;
'"
>.
o
<3
"'
~
.en
"
<::
o
r.n
I
:::;;
r.n
o
N
'-'
-0
'-'
<::
L
.Q
~-
'"
.0
E
...:
:s
'"
"
'"
E
>;
"
<::
o
'"
~
.en
>;
o
U
I
-'
U
~
N
'-
....
<::
L
.Q
~-
'"
.0
E
:>
"
L
o
-C
-'"
>; '-'
'" e
>. "
o '"
<3 .Q
.:,,:.~ -g
'-' L
o '"
L -C
" ~
'" 0
.Q '"
'"'
'" I
<:: I
B I
~in
<::
o
r.n 0
I ~
r.n
u
r.n
rTTll
LWJ
"'"
w
-'
o
::c
f-
r.n
w
f-
o
'"
o
N
'-
0>
n
11111111111111111111111111111111'111
'"
133.:1 NI Hld30
~
i
w
I :
is ~
Q
~ ~
~ ., Ij
~ .. "
i ;5 :J:
-'
o
"'6::
00
f-
o
N
N
~ ~
" "' i'l ~
~ F ., "
5 ~ ~ ~
Q _ N
fil z " <
0: - '"
15 ~n ~
'i ___ Q
~~~~
~ ~ :; r!l
~ ~ i ~
b i ! i
"
'"
N
'"
~
".
~
.,
<::>
~
.,
-
-
<::>
'"
~
~
~
~
...,
~
<.i
~
~
z
;5
~
::>
'"
z
o
u
V:l
kl
.....,
Cl
::t:
h
V:l
~
~
Cl
c.;,
Cl
.....,
iI!
;::>
u
::>
'"
>-
<n
'"
~
<5
z
I
~
W
<.>
c..i
:j
t5
~
~
~
~
'-'
~
I/)
~
~
o
n
--...- ~. ~
!
0) -
'" -
0 ""
<:: 0 en
0 E
"" >-C -0 ~
0- 0) :;::
.C 0) ~ E
u >...a .S2 >,
i en 0
0) u---' " 0 0)
Cl >'u >. .
-0 o <::
:.= -+-'~ <:: - ~
, U..a
.0 '" en 0 <::
<.n _'0 en ~ q;......
Z'E ..a
i5~ c.~
.OJ 0 0
-~ ~ E
-0 '(i) ,~ '"
" 0) 0 -0
1;!E >,E <:: ,:
0
0 0 <.n
<.n u I
I I <.n
::E .....J U
<.n u <.n
~
0 ~ ~
I I
~~ ! L()~ o~ r-~
+ ~ 0-= .+ .+
~<5 o~ o~
- en ! I g += +=
0) <:: <:: 0) 0)
;c 0 0 ;c ;c
<.n U i u <.n <.n
0) i
en >
<:: 0) I I
.OJ .OJ i IX!
, en ~ I 0 I
, 0 0 I N I
I 0.. 0 i
N
i
,
i ~
0) en N N
, "'*' E ;c N ~
C> E 0 '-- '--
.... 10 '-- .... C>
~ 0
:r: L() - '"
i !
, CD
Z' CD 0 "':
~.OJ - 0 to C>
Cl <:: ~ I ~ cn CXJ
0)
Cl
I ,
~ ~ i
<:: cn ~
::J 0) , cn n
~ ~ N
en <:: ~ I oci N '"
.0 0
::E U
,
,
I -<= ~ '"
~ "CXJ
~ 0) n ~
0- 0)
0) -
Cl ~ i
I ~ ~ ~
0) 0 ! "'*" "'*" "'*"
<5 z
:r: :r: :r: :r:
1 f- f- f-
i . L~.__'-.~_..__..
.----........-~^.^r.~
, ,
I I
~ ~ I
I ~ ~!
I ~ -'
0)10:_
c. I
I ~ ~
~ ~
! ~ ~ ~.I
I .
---~T~-L-w-wl
c..!l, ~ I
~Ir t~1
~ I.~ ...1
e-; 1 ~ 11"
~!:al
Oi:ll ~;ill
~:] pi
~ I to i i
l:l::i, i
~i I
I ~!
I '"' I
1 '-' I
! ~I
! ~I
I ~i
I ~i
~I
V)I
I
I
G .
'-'I 1
'-'I .
cS
~
Q:;
~
~
t.:>
~,
V)
~
Q:;
0:;
L___~_~~___~_~ __...,J
Conso!. under constant
10 TH #1 @ 3' pressure due to wetting
8
-'
-' 6
w
3:
Ul
+ 4
'-.
I
Z 2
0
~ 0
::J
0
Ul 2
z
0
U
t-- 4
z
w
u 6
"" Water added
w
a.. to sample
10 TH #1 @ 8'
8
-'
-' 6
w
3:
if)
+ 4
'-.
I
z 2
0
~ 0
Cl
::J
0
if) 2
z
0
U
t-- 4
z
w
u 6
""
w
a..
100
500 1 ,000
10,000
100,000
LOAD (pst)
Conso!. under constant
pressure due to wetting
100
500 1,000
10,000
100,000
LOAD (pst)
SWELL-CONSOLDATJON TEST
JOB NO. 011352
GEOTECHNiCAl & STRUCTURAL CONSULTANTS
FIG. NO. 3a
10 TH #1 @ 13'
8
...J
...J 6
w
3:
(f)
+ 4
"-
I
:z: 2
0
~ 0
::J
0
(f) 2
:z:
0
u
0- 4
:z:
w
u 6
""
W
D...
10
8
...J
...J 6
w
3:
(f)
+ 4
"-
I
:z: 2
0
~ 0
::J
0
(f) 2
:z:
0
u
0- 4
:z:
w
u 6
""
W
D...
100
100
500 1,000
500 1,000
~
' , ,
.:...'".....:.....;.:.
LOAD (psf)
LOAD (psf)
Swell under constant
due to
10,000
100,000
Con sol. under constant
due to wetting
10,000
SWELL-CONSOLDATION TEST
PARK'S ENGINEERING, LLC.
100,000
GEOTECHNICAL & STRUCTURAL CONSULTANTS
JOB NO. 011352
FIG. NO. 3b
a3NI\l1]~ IN3::J~3d
o
o
~
o
OJ
o
"
o
CO
o
...
o
If)
o
'"
'",
,
~
.
...
-;;:,
V>
'-'
z
Zoo
W,-
15'"
W
V>~
o :::l"'<t-
~g,.....
~'"
"'~""
C;:;O-
v; 0
;;;.
'"
-
o
'"
V>-
EE~
w_
V>
00
~-'"
o
z
i7j
o
.0
V> ~
;:S-
o
o
N
-
Z:
:;;
Vl
(;)
r V>
...J '-' .
<[~~
ZO~
<l:~...
'" .
a::w~
w~'"
tJi=......
::lI:
o
'"
'"
r
I
Z:
5!
o
'"
o
o
~
o
If)
o
...
o
CO
o
'"
o
CD
o
"
o
'"
~NISS\ld IN3::J~3d
o
CD
o
OJ
o
'"
g
o
o
~
N
<ci
.....
<ci
'"
ai
N
'"
ai
'"
.....
...
""
,.,
N
'"
--:
V>
'"
W
tJ
o ~
Q) ::i
~ -'
5!
o~
Z~
~;J5w
..... W ~
'" -'
"! 0
~
11:
~ ~
'"
t;;
... ~
..... ...
q Ci
.....
'"
~
'"
C!
'"
o
~
'"
o
~
o
-' W
WV>
~~
00
V>
~
OJ
CD
o
o
W
z
0::
W
V>
'"
C'i
o
W
z
0::
a:-
I
z
o
z
'6
V;
~
U
c=
5
"-
~
o
~
00
o
N
:s
u
"<l
~
(f)
~
N
(])
"
o
z:
~
t<:
o
o
-'
w
~
0::
G
;.,.,
@
::r:
f-
L>-
a
w
-'
0..
::::;;
<(
(f)
~
OJ
-
-
'"
"
OJ
~
~
~
<.i
"
~
::3
VJ
kl
0:::
E-.
VJ
~
:<;
o
h
~
~
U1
.....
~
-'
::>
on
z
o
o
~
Ei
::>
!5i
""
-'
<5
z
:r:
o
~
6'1
o
<.:i
:j
<S
~
~
~
t3
~
CI)
~
~
BRACE WALLS TOP AND BOTTO~
PRIOR TO BACKFILLING ~
CONCRETE GRADE BEA~ ~
EXPANSION JOINT
FLOOR SLAB \
POLYETHYLENE GLUED TO WALL AND
EXTENDED ALONG THE BOTTO~ OF
THE EXCAVATION
WELL SLOPED
. r 12" PER 1D FEET
/ DO NOT DIKE WITH
SOD DR EDGING
.
.
s
s
.
.
15# BUILDING FELT]
~~,-~.~~~~~---
~
TOP 12" OF WELL
CO~PACTED BACKFILL
DAMP PROOFING
~ODERATELY
CO~PACTED
BACKFILL
4" DIA. PERFORATED PIPE
SLOPE DRAIN PIPE 1 /B"
PER FOOT TO DAYLIGliT OR
TO A SU~P PIT
BACKFILL AROUND THE FOUNDATION SHOULD BE ~OISTENED AND CO~PACTED
AND THE FINAL GRADE SHOULD BE WELL SLOPED TO PRECLUDE PONDING
OF RAINFALL, IRRIGATION WATER AND SNOW ~ELT ADJACENT TO FOUNDATION WALLS.
CAUTION: DO NOT DIKE OR I~PEDE THE FLOW OF WATER AWAY FRO~
FOUNDATION WALLS WITH SOD, EDGING OR DECORATIVE GRAVEL AND
POLYETHYLENE. DOWNSPOUTS AND SILL COCKS SHOULD DISCHARGE INTO
SPLASH BLOCKS OR LONG EXTENSIDNS.
DRAIN SYSTEM BELOW GRADE & BACKFILL DETAILS
PARK'S ENGINEERING, LLC
GEOTECHNiCAl ole STRUCTURAL CONSULTANTS
FIG. NO. 4
PROVIDE A ~INI~U~ SLOPE OF 12" IN THE
FIRST 10 FT. OUT FRO~ THE STRUCTURE
ROOF GUTTER DOWNSPOUT AND EXTENSION
SHOULD EXTEND BEYOND THE GRAVEL OR BARK AREA
=
::-
DECORATIVE
GRAVEL OR BARK
=
J
WOOD OR ~ETAL EDGE WITH WEEP
HOLES OR 1/2" SPACE TO
ALLOW THE FREE WATER FLOW
DRAINAGE AROUND FOUNDATION WALL
i
PARK S ENGINEERING, LLC.
GEOTECHNICAL 8< STRUCTURAL CONSULTANTS i
FIC. NO. 5