Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
3093-3095 Benton Street
i CITY OF WHEAT RIDGE �- Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: L/ O 9 - ;::7 ., " ) Job Address: 3 0 9 3 a13e ►, �o n S �- Permit Number: ---) G I Z 0 1 -7 �-I o ❑ No one available for inspection: Time 46:_yy &PM Re -Inspection required: YesNgo When corrections have been made, call for re -inspection at 303-234- Date:--7 03-234-Date:-7 /3 / z Inspector: T -b DO NOT REMOVE THIS NOTICE Ai)) i CITY OF WHEAT RIDGE Vr Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE / Inspection Type: 206- �` ' I + d/ 0o -r Job Address: 20g3 R'/, -td n -S-i-, Permit Number: `2O/ M 714 U 'd 0 ❑ No one available for inspection: Time GSC A /PM Re -Inspection required: Yes Md When corrections have been made, call for re -inspection at 303-234-5933 Date: /-z 146 Inspector: r' L DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 3 a 4- IVI . - Q v o -� Job Address: o G 3 P 4n „ S �- Permit Number: 'P n l F o I --7 U 0 idrGk)'F !UDS Ht�q /Uv ❑ No one available for inspection: Time f_') / Cif A M] Re -Inspection required:es No ✓/ When corrections have been made, call for re -inspection at 303-234-5933 Date: / // Inspector: hd�4P, L j ✓e V DO NOT REMOVE THIS NOTICE City of Wheat Ridge Residential Roofing PERMIT - 201801740 PERMIT NO: 201801740 ISSUED: 06/15/2018 JOB ADDRESS: 3093 Benton ST EXPIRES: 06/15/2019 JOB DESCRIPTION: Reroof Duplex Units 3093-3095 Benton St. Remove and Install Malarkey Legacy Antique Brown Asphalt Shingles with 14 squares. Pitch 4/12. *** CONTACTS *** OWNER (303)982-6359 LORRAINE K THOMAS TRUST SUB (303)421-7100 Ted Roland 018516 K & H Windows & Exteriors *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 4,165.26 FEES Total Valuation 0.00 Use Tax 87.47 Permit Fee 125.05 ** TOTAL ** 212.52 *** COMMENTS *** *** CONDITIONS *** Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be required for both the midroof and final inspections. The 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec. R806. The installation of ridge venting requires the installation or existence of soffit venting. For calculation purposes, one hat or turtle vent equal to one-half of one square foot of opening. Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201801740 PERMIT NO: 201801740 ISSUED: 06/15/2018 JOB ADDRESS: 3093 Benton ST EXPIRES: 06/15/2019 JOB DESCRIPTION: Reroof Duplex Units 3093-3095 Benton St. Remove and Install Malarkey Legacy Antique Brown Asphalt Shingles with 14 squares. Pitch 4/12. 1, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable buils&g codes, and all app 'cable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the le owner of the prope a am authorized to obtain this permit and perform the work described and approved in conjunction with this it. I furtlfer test a a legally authorized to include all entities named within this document as parties to the work to be per med andrthat 'b erformed i disclosed in this document and/or its'.accmpanying approved plans and specifications. G 0d V. � Signature of O R or CONTR CTOR (Circle one) Date + 1. This permit was issued based on the information provided in the permit application and accompanying pplans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3, If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change, of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable code or any grdinance or regulation of this jurisdiction. Approval of work is subject to field inspection. i Signature of Chie Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Lagenia Reimer ��? (� ) " From: no-reply@ci.wheatridge.co.us Sent: Friday, June 15, 2018 10:10 AM To: CommDev Permits Subject: Online Form Submittal: Residential Roofing Permit Application Categories: Gina Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling uniDuplex are on the property' PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number (enter WITH dashes, eg 303-123-4567) I 3093-3095 Benton St Lorraine Thomas / 303-232-4645 0 Property Owner Email Field not completed. Address Do you have a signed Yes contract to reroof this property? Applications cannot be submitted without an executed contract attached below. Attach Copy of Executed Contract.pdf,'0 Contract CONTRACTOR INFORMATION Contractor Business K&H Windows and Exteriors.`_; Name Contractor's License 018516 Number (This is a 5 or 6 digit number for the City of Wheat Ridge) Contractor Phone Number (enter WITH dashes, eg 303-123-4567) Contractor Address (Primary address of your business) 720-420-1727 5805 W 56th Ave Arvada, CO 80002 Contractor Email Address rrobinson@khwindows.com Retype Contractor Email Address DESCRIPTION OF WORK rrobinson@khwindows.com TOTAL SQUARES of tear out and instal /14, squares in Malarkey Legacy Antique the entire scope of work: Brown Project Value (contract- 4165.26 value or cost of ALL materials and labor) Are you re -decking the roof? Is the permit for a flat roof, pitched roof, or we Pitched roof (2:12 pitch or greater) 2 0 both? (check all that apply) What is the specific pitch, 4/12 of the PITCHED roof? How many squares are ,,' 14 part of the PITCHED. roof? Describe the roofing materials for the PITCHED roof: Type of material for the PITCHED roof: Provide any additional detail here on the description of work. (Is this for a house or garage? Etc) tear out and install 14 squares in Malarkey Legacy Antique Brown Asphalt This is a duplex. SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal 3 i owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Person Applying for Rachael Robinson Permit Email not displaying correctly? View it in your browser. INSPECTION RECORD Occupancyffype INSPECTION LINE: (303) 234 -5933 Inspections will not be made unless this card is posted on the building site Call by 3:00 PM to receive inspection the following business day. INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB FOUNDATION INSPECTIONS DATE INSPECTOR INITIALS COMMENTS: Footings /Caissons Stemwall / (CEG) Concrete Encased Ground Reinforcing or Monolithic /Q K Weatherproof / French Drain Sewer Service Lines Water Service Lines INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS. POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED CONCRETE SLAB FLOOR Electrical (Underground) Plumbing (Underground) Heating (Underground) DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED ROUGHS Sheathing Lath /Wall tie Mid -Roof Electrical Service Rough Electric Rough Plumbing Gas Piping Rough Mechanical ABOVE INSPECTIONS TO BE SIGNED PRIOR TO PROCEEDING Framing Insulation Drywall Screw FINALS Electrical Plumbing Mechanical Roof /Q K Building Final Fire Department R.O.W & Drainage INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS. Parking & Landscaping "NOTE: ALL ITEMS MUST BE COMPLETED AND APPROVED BY PLANNING AND ZONING, BUILDING AND PUBLIC WORKS BEFORE A CERTIFICATE OF OCCUPANCY IS ISSUED. FINAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTE AUTHORIZATION OF A CERTIFICATE OF OCCUPANCY NOR PERMISSION FOR OCCUPANCY. OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF OCCUPANCY IS ISSUED PROTECT THIS CARD FROM THE WEATHER ♦ i CITY OF WHEAT RIDGE Building Inspection Division r (303) 234 -5933 Inspection line (303) 235 -2855 Office • (303) 237 -8929 Fax 1 INSPECTION NOTICE Inspection type: Reo Job Address: ®`T3 - 9S 05k,17�� s7` Permit Number: A917' S G' 'otIr ❑ No one available for inspection: Time A PM Re- Inspection required: Yes N * When corrections have been made, call for re inspection at 303 - 234 - 5933 Date: Inspecto , DO NOT REMOVE THIS NOTICE r ♦ i CITY OF WHEAT RIDGE Building Inspection Division (303) 234 -5933 Inspection line (303) 235 -2855 Office • (303) 237 -8929 Fax INSPECTION NOTICE Inspection Type: 3 — ❑ No one available for inspection: Time /�V� M Re- Inspection required: es No When corrections have been made, call for re- inspection at 303 -234 -5933 Date: Inspecto DO NOT REMOVE THIS NOTICE Job Address. a9".3 9S 13�,72�.o s, Permit Number: 1 © 1c71S "4' City of Wheat Ridge Residential Roofing PERMIT - 101915 PERMIT NO: 101915 ISSUED: 08/05/2010 JOB ADDRESS: 3093 -95 Benton St EXPIRES: 08/05/2011 DESCRIPTION: Reroof 12 sqs with 30 yr Tamkoshingles * ** CONTACTS * ** owner 303/232 -4645 Laurie Thomas sub 303/880 -1542 Vaughn Tromburg 10 -0242 Reliable Roofing ** PARCEL INFO ** ZONE CODE: UA USE: UA SUBDIVISION: 0525 BLOCK /LOT #: 0/ ** FEE SUMMARY ** ESTIMATED PROJECT VALUATION: 3,500.00 FEES Permit Fee 109.20 Total Valuation .00 �P7,ri�b, hy, 1•,'1.. Use Tax 63.00 rVN(`1 -17 ** TOTAL ** 172.20 Conditions: b nails per shingle is required. Ice dam membrane is required from eave edge to 2' inside exterior walls. Board sheathing with any gap greater than 1/2" requires panel sheathing overlay on entire roof. Sheathing inspection is required prior to covering. Midroof inspection is not required on permits purchased after 4/18/10. Contractor shall provide ladder for inspections. Scheduled inspections that cannot be performed due to inclement weather must be cancelled prior to 8: a.m. on the day of inspection or a re- inspection fee will be assessed. I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicablq, Wheat Ridge Ordinances, work under this permit. Plans subject to field inspection. Signature of contractor /owner date 1. This permit was issued in accordance with the provisions set forth in your application and is subject to the laws of the State of Colorado and to the Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable ordinances of the City. 2. This permit shall expire 180 days from the issue date. Requests for an extension must be received prior to expiration date. An extension may be granted at the discretion of the Building Official. 3. If this permit expires, a new permit may be acquired for a fee of one -half the amount normally required, provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit. 4. No work of any manner shall he done that will change the natural flow of water causing a drainage problem. 5. Contractor shall notify the Building Inspector twenty -four (24). hours in advance for all inspections and shall receive written approval on inspection card before proceeding with successive phases of the job. 6. The issuance of a permit or the approval of drawings and specifications shall not be construed to be a permit for, nor an approval of, any violation of the provisions of the building codes or any other ordinance, law, rule or regulation. All plan review 's subject to field inspections. Signature f Building Official date INSPE ION REQUEST LINE: (303)234 -5933 BUILDING OFFICE: (303)235 -2855 REQUESTS MUST BE MADE BY 3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Cit of " h 7_ Y I � ead ° i e Date: !°� UNITY:DEVELOPMENT Plan # Building & Inspection Services Division Permit # 1 �� 7500 W. 29" Ave., Wheat Ridge, CO 80033 Office: 303 - 235 -2855 * Fax: 303 - 237 -8929 Inspection Line: 303 - 234 -5933 Building Permit Application !'roperty,Atliliess 50 1 6en7 %o j %,j Sr ^ IK a� �oC to Property Owner (please print): Z. A 2 � 2 - '( - r—A 5 Phone: 3 232- y (a � Mailing Address: (if different than property address) Address: / 7 cI City, State, Zip: �� l c ew a� 0 C b e c:> 90460* Ple � (A gL E \ F N Cr Contractors City License M Pho 9v CD -1 S-l2 vuN�MVIIILIW4ll/la' Electrical: Plumbing: Mechanical: City License # City License# City License # D�sacrl�p�loia°o��ork� Contract Value: , Review Fee (due at time of submittal): Squares 2 BTU's Gallons Amps Sq Ft. $ OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge . codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. CIRCLEONE: ( (CONTRACTOR) or (AUTHORIZED REPRESENTATIVE) of( WNER) (CONTRACTOR) PRINT NAME: V -w'� 1 � ` L SIGNATURE: V-� ( DATE: ZZ Bldg Valuation: COMMUNITY DEVE OPMENT DEPT. Inspection Se .ces Division (303) 23 2855 Correctio Notice I I , I r , I t , I I Job Address: 7,oQ:> /,,-,,/ /Orl -y / J, Jl.. (" --r~. I f I ~ ? j, /,1 "7 J (-'(I>ul / When corrections have been made, call fo re-inspection at 303-234-5933. Date: 7 ./C- Inspector DO NOT REMOVE THIS OnCE J 1 , 'j '1 ] J 1 j , 1 , ~ , I j ~ 1 I j 1 I 1 j j I I ; COMMUNITY DEVELOPMENT DEPARTMENT BUILDING INSPECTION LINE - (303-234-5933) CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80033. (303-235-2855) uilding Permit Number: 15474 Date: 5/7/2003 Property Owner: LORI THOMAS Property Address: 3093 BENTON ST Contractor License No, : 17013 Company: MAJOR HEATING & AIR COND. OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREE MEN Phone: 982-6359 Phone: 424-1622 (OWNER)(CONTRACTOR) SIG Total: $3,000.00 $108.30 $0.00 $0.00 $108.30 I hereby certify that the setback distances proposed by this permit application are accurate, an do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record: that all measureme shown, and allegations made are accurate; that I have read and agree to abide by all co , Ilions printed on this application, and that I assume full respansi T ior compliance Ith the Wheat Ridge Building Code (U.B.C.) and all other applicable t Ridge or . an 5, fa ark under this permit. "t:-, r-: i"::'--:; ATE- )/ '" Construction Value: Permit Fee: Plan Review Fee: Use Tax: Use: Description: INSTALL TWO NEW AlC WALL UNITS BUILDING DEPARTMENT USE NL Y iZonio:g:~orlllnll5m Approval: Zoning: B.aildingemlioolintsll Approval: OM P,ublic:~13'r"~s'C.~mro!!nts: Approval: Occupancy: Walls: SIC: Sq. Ft: OKAY 5/7/03 Roof: Storie Residential Units: Electrical License No : 19585 Company : Over-all Electric Expiration Date: 2/28/2005 Approval: OM Plumbing License No : Company: Mechanical License No : 17013 Company: MAJOR HEATING & AIR COND. Expiration Date: 4/29/2004 Approval: OM Expiration Date: Approval: (1) This permit was issued in accordance with the provisions set forth in yopur application and is su ct to the laws of the State of Colorado and to the Zoning Regulations and Building Code of Wheat Ridge, Colorado or any other applicable ordinances of e City. (2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from i ue date or (8) the building authorized is suspended or abandoned for a period of 120 days. (3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally re ired, provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) ar. If changes are made or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit. (4) No work of any manner shall be done that will change the natural flow of water causing a drainag problem (5) Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections nd shall receive written approval on inspection card before proceediing with successive phases of the job. (6) The issuance of a permit or the approval of drawings and specifications shall not be construed to e a permit for, nor an approval of, any violation of the provisions of the bui code or other ordinance, law, rule or regulation. " DEPARTMENT OF PLANNING AND DEVELOPMENT Sui ding Permit Number: BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE Date: 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 A PPl\ Cf\ I D N This permit was issued in accordance with the provisions set forth in yopur application and is subject to Regulations and Building Code of Wheat Ridge, Colorado or any other applicable ordinances of the City This permit shall expire if (A) the work authorizld is not commenced within sixty (60) days from issue d or (B) the building authorized is suspended or abandoned for a period of 120 days. If this permit expires, a new permit may be acquired for a fee of one:-half the amount normally required, 'ded no changes have been or will be made in Ule Original plans and specifications and any suspension or abandonment has not exceeded one (1) year. changes are made or if suspenSIOn or abandonment exceeds one (1) year, full fees shall be paid for a new permit. (4) No work of any manner shall be done that will change'the natural now of water causing a drainage probt rn. (5) Contractor shall notify the Building Inspector twenty.tour (24) hours in advance for all inspections and s II receive written approval on inspectiOn card before proceediing wtth successive phases of the job. (6) The issuance of a permit or the approval of drawings and specifications shall not be construed to be a rmtt for. nor an approval of. any violation of the provisions of the building COdes or any other ordinance. law, rule or regUlation. .i-t:J N -rA& /J1 /1 s c30-;7$ ;5:9'-/0N :iJ r-- Contractor License No. : / 7 t) 13 Company :~/-1J2v /-1-(" .47/ri 7 r.4 /c Property Owner: Property Address: OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and a~r~.e to abide by all co~ditions printed C?" this . . application, and that I assume full responsibility for comphan~ With the Wheat Ridge BUilding Code (U.B.C.) and all other applicable Whe~t . ge ordin n s, fo :.;work under this permit. (OWNER)(CONTRACTOR) SIGNED DATE ":y?,03 Description: ~7}L-t..I TZ-u (/ /lIe luad .AX-' -/ir BUILDING DEPARTMENT USE ONL "'"~~l~ Approval : Zoning: : JIU!..uiTIj~i!:i.:ll':LltlWl~ Approval: ~,~,~'*'- ~ Approval: Occupancy: Walls: Roof: Stories: Electrical License No : Company Cve.--Jt &+ Plumbing License No : Company: Expiration Date : Approval : Expiration Date : Approval: (1) (2) (3) Chief Building Inspector 17'1lcj 5/7105 Phone: 3tJ3-q~2. 63--> 'l Phone: 325:5 -t/;l<,/-/6 7 p-- Construction Value: ,3C:,P?> ~ Permit Fee: UseTax: @tfJcjft.--- Total: Use: SIC: Sq. Ft: Residential Units: Mechanical License No: /76J~ 3 ,,1 Company: '1JJ,jl/~r Ilftt$ r ~ ~C- Expiration Date: ././/:L f / ~ '/ Approval: laws of the State of Colorado and to the Z.oning " / 6 , A RTMENT OF PLANNING AND DEVELOPMENT UILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Property Owner: Property Address: 3093-95 BNNTON ST ontractor License No.: 17838 Company: Judson Enterprises DBAlK-Designers "ONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT that the setback distances proposed by this perm~ application are accurate, late applicable ordinances, rules or regulations of the City of Wheat Ridge or sements or restrictions of record; that all measurements shown, and allegations urate; that I have read and agree to bide by all conditions printed on this i,nd that I assume full responsibili r m Iiance with the Wheat Ridge Building ) and all other applicable Whe e 0 rk under this permit : NTRACTOR) SIGNED DATE/-<;-9(.. VINYL SIDING, SOFFIT & FASCIA BUILOING OEPARTMENT USE ON Y Roof: Stories: Walls: "License No : Plumbing License No : Company: Expiration Date : Approval : . Iding Permit Number: Date: Phone: 232-4645 Phone: 231 0044 Construction Value: Permit Fee : Plan Review Fee : Use Tax: Total: Residential Units : Mechanical License No : Company: Expiration Date : Approval : . 2477 1/9/96 $1,705.00 $41,00 $0,00 $25.5~ $66.57 permit was issued in accordance with the provisions set forth in yapur application and is subject the !awl of the Slate of Colorado and to the Zoning laUons and Building Code of Vllheat Ridge, Colorado or any other applicable ordinances of the I . permlt shall expire If (A) the work authorized is not commenced within sixty (60) days from Issue ate or (B) the building authorized Is suspended or cloned tor a period of l~O da~.. pennlt expires. a new pelTTllt may be acquired for a fee of one-half the amount normally requi . provided no changes have been or will be made in the al plans and specifications and any suspension or abandonment has not exceeded one (1) yea If changes are made or If suspension or abandonment s one (1) year, full fees shall be paid for a new permit. !Work of any manner shall be done that will change the natural flow of water C8usi!'P a drainage em. ctor shall notify the BuildIng lnsoector twenty~four (24) hours in advance for all inspections an shall receive written approval on inspection card before iing with successive phases of the I i'cob. Is uanee of a permit or the approval 0 drawings and specifications shall not be construed to be permit for. nor an approval of. any violation of the provisions 1.111 . 9 codes or a other ordinance, law, rule or regulation. .. ~'d f Building Inspector THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIE BUILOING INSPECTOR CALL: 234-5933 24 HOURS PRIOR TO IN ECTlON l~l (6) 1J[tSB) DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number: . BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE Date: /-9- 9- ~ 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Property Owner: J,oKK/G' 77JcrmR- 5 , 1 Property Address: 3c/13 <f <5""095- .3ee.IIJ7C7! L Contractor License No.: / '7 SJ 3' Company. K~ be Sf 6rN.s::R.S Phone: 23?--C/?<-o'i) Phone 230-0o<F/ OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEME T Construction Value: J '7 0 Permit Fee: I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record: that all measurements shown. and allegatl 5 made are accurate; that I have read and agree de by all conditions printed on this application, and that I assume full respon~.~ l~b" compliance with the Wheat Ridge Build' 9 Code (U.B.C.) and all other applicable Wi)A 0 , for work under this permit. (OWNER)(CONTRACTOR) SIGNED DATE . A} -9 Use Tax: Total: Description. 1) V /-IV L SiDiNt;:; c FF/74MI2/p :J BUILDING DEPARTMENT USE Approval: Zoning: Approval: ~1L' ,j,J.l',\,~~,lll1l, 1,1' Approval: Occupancy. Walls. Roof. Ston Residential Units. Electncal license No . Company. Plumbing license No Company, Mechanical license No . Company. Expiration Date: Approval. ...:l 'PJIrJs,I{!tlulred" Expiration Date: Approval. ..I Plans I{equired I Expiration Date: Approval. ,111 ! a_n._"'"..d ...; :. ''':_U~j;~'''''_ _ (4) (5) (6) This permit was ISSUed in accordance with the provisions set forth in yopur applicatIon and IS su ,ect 10 the laws of the State of Colorado and to the Zoning RegUlations anCl Buildmg Code of lNheat Ridge, Colorado or any other applicable ordinances of he City ThIS perm.t shall expire If (A) the work authOnzed IS not commenced Within SIXty (60) days from I sue date or (B) the bUilding authorized is suspended or abandoned for a period of 120 days. If this permit expires, a new ,permIt may be acquired for a fee of one-half the amount normally r uired. provided no changes have been or will be made in the onglOal plans and specifications and any suspenSIon or abandonment has not exceeded one (1) ear. If changes are made or If suspensIon or abandonment exceeds one (1) year, full fees shall be paid for a new permtt. No work Of any manner shall be done that WIll change the natural flow of water causing a dralna e problem Contractor shall notify the Building Inspector twenty.four (24) hours In advance for all InspeCtion and shall receive written approval on Inspection card before proceediing with successive phases of the Job, The Issuance of a permit or the approval of drawings and specifications snail not oe constrUe{;] t be a permit for. nor an approval of, any VIOlation of the provisions of the bUilding codes or any other ordinance. law. rule or regUlation (1) (2) (3) Chief Building Inspector ForM or THIS PERMIT VALID ONLY WHEN SIGNED BYTHE CHIEF B ILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO NSPECTION DEPARTMENT OF PLANNING AND DEVELOPMENT BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 ilding Permit Number: 95-487 Date : 3/8/95 Property Owner: Property Address: 3093-95 BENTON ST Contractor License No.: 17814 Company: James Dye Construction Phone: 232-4645 Phone: 2746718 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Description: REROOF -~ DATE Total: $1,185.00 $29.00 $0.00 $17.77 $46.77 Construction Value: Permit Fee: Plan Review Fee: Use Tax: I hereby certify that the setback. distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants. easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and a~ree to abide by all conditions printed on this application, and that I assume fun responsibility for compliance with the Wheat Ridge Building Code (U.B.C.) and all other applicable Wh at ~_idge ord nances, for work under this p rmi (QWNER)(CONTRACTOR) SIGNED BUILDING DEPARTMENT USE ON Y Approval: Occupancy: Walls: Roof: Stories: Residential Units: Electrical License No : Company: Plumbing License No : Company: Mechanical License No : Company: III Expiration Date: Approval: III Expiration Date: Approval: Expiration Date: Approval: III This permit was issued in accordance with the provisions set forth in yopur application and is subll Regulations and Building Code of Wheat Ridge, Colorado or any other applicable ordinances of the This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issu abandoned for a period of 120 days, If this permit expires, a new permit may be acquired for a fee of one-half the amount normally requi , provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) yea, If changes are made or if suspension or abandonment exceeds one (1) year, full fees shall be paid fora new permit. No work of any manner shall be done that will change the natural flow of water causing a drainage p blem. Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections an shall receive written approval on inspection card before proceediing with successive phases of the/'ob. The issuance of a permit or the approval 0 drawings and specifications shall not be construed to be permit for, nor an approval of, any violation of the provisions fthe building codes or any other ordinance, law, rule or regulation, C' C'JlJ G~ Chief Building Inspector THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHI BUILDING INSPECTOR CALL: 234-5933 24 HOURS PRIOR TO IN PECTION o the laws of the State of Colorado and to the Zoning ity. date or (B) the building authorized is suspended or (1) (2) (3) l~l (6) This permit was issued in accordance with the provisions set forth in yopur application and is subject the laws of the State of Colorado and to the Zoning Regulations and Building Code of Wheat Ridge, Colorado or any other applicable ordmances of. the C This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from Issue ate or (B) the building authorized is suspended or abandoned, for a penod of 120 days. If this permit expires, a new permit may be acquired for a fee of one-half the amount normally requir provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year If changes are made or If suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit. No work of any manner shall be done that will change the natural flow of water causing a drainage pr lem. Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all mspections and hall receive written approval on inspection card before proceediing with successive phases of the job. The Issuance of a permit or the approval of drawings and specifications shall not be construed to be permit for, nor an approval of, any violation of the provisions of the building codes or any other ordinance, law, rule or regulation. DEPARTMENT OF PLANNING AND DEVELOPMENT BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 '.-tJ!<;<t€ rllCJMAS 3cJ13-1~ BflffCiN 17'11'1 Company · JIM [) Y ti-- Property Owner: Property Address: Contractor License No. . OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record: that all measurements shown, and allegations made are accurate: that I have read and agree to abide by all conditions printed on this application, and that I assume full responsibility for compliance with the Wheat Ridge Building Code (u.s..,' ~ '" _. '~'~J) "'l" '.~"'..'~" oM" "7.?" . IOWNER)ICONTRACTOR) SIGNED W'j!-?~'DATE3 ," .~ Description: JT1< 1 / /'-/f '/Ar- I! E-i &; BUILDING DEPARTMENT USE ON Y Approval: Zoning: Approval. Occupancy. Walls: Roof: Stories: Electrical License No . Company. Plumbing License No : Company: Expiration Date: Approval : Expiration Date: Approval: . .II (1) (2) (3) (4) (5) (6) Bu ding Permit Number: Date: Phone: ;)-3~ - tJc" V S- Phone:;L 7Cj ---c:;, 7ff Construction Value. Permit Fee: Use Tax: ~ ;:<S' ~qJy' ! 7 '17 I . Cf-0_77 Total: Residential Units: Mechanical License No . Company: Expiration Date: Approval: . Chief Building Inspector For Mayor THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUlL ING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INS ECTION