Loading...
HomeMy WebLinkAbout4325 Everett StreetFrom: no-reolvCalci.wheatridae.co.us To: CommDev Permits Subject: Online Form Submittal: PERMIT APPLICATION Residential Interior Remodel Date: Monday, May 16, 2022 6:48:48 PM CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Report any suspicious activities to the IT Division. PERMIT APPLICATION Residential Interior Remodel This application is exclusively for Residential Interior Remodels and other scopes of work which do not have a specific form already available. YOU MUST ATTACH A VALID CREDIT CARD AUTHORIZATION FORM IN ORDER FOR THE PERMIT TO BE PROCESSED. Your Permit will be emailed to the email address provided below once it is processed. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN WORK UNTIL PERMIT HAS BEEN ISSUED. PROPERTY INFORMATION Property Address 4325 Everett St. Property Owner Name Samuel Beck Property Owner Phone 318-426-0239 Number (enter WITH dashes, eg 303-123- 4567) Property Owner Email Address Attach City of Wheat Ridge Electronic Payment Form - "DO NOT ATTACH A PICTURE OF A CREDIT CARD" spbeck12@yahoo.com APPLICANT INFORMATION Applicant Name Samuel Beck What is your role in the Property owner project? Are you performing the work yourself, live in the home and will be living in the home 1 year after completion? Contact Phone Number (enter WITH dashes, eg 303-123-4567) Contact Email Address for Plan Review Comments Retype Contractor Email Address DESCRIPTION OF WORK Detailed Scope of Work - In the space below (not as an attachment), Provide a detailed description of work including mechanical, electrical, plumbing work occurring, adding/removing walls, etc I, the applicant, understand my application will be rejected if I do not include a Detailed Scope of Work. 318-426-0239 spbeckl2@yahoo.com spbeckl2@yahoo.com Change existing shower/tub to standing shower only (same location/footprint), replace toilet (same location/footprint), keep vanity (same location/footprint) but replace countertop sinks, faucets, add drop in tub (necessary to take adjoining bedroom closet space), new floor, new tile and fixtures I have entered a detailed scope of work. Location of Work 2nd floor bathroom Square Footage Area of Work Being Performed Asbestos Report Upload letter size documents here Construction Plans 10.5ft. x12.5ft. Field not completed. Field not completed. scanned on 11'x17" or larger Project Value (contract $40,000 Valuation Okay value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have Yes been authorized by the legal owner of the property to submit this application and to perform the work described above. Person Applying for Samuel Beck Pe rm it I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Email not displaying correctly? View it in your browser. i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTIC�,E Inspection Type: Job Address: , 74 Permit Number: �_- A i �- e; ❑ No one available for inspection: Tim AM/PM Re-Inspection required: Yes When corrections have been made, schedule for re -inspection online at: hUp✓/www.ci.wheatridge.co.us4nsp eO m t Date:' sp c DO NOT R OVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: JobAddress: Permit Number: ❑ No one available for inspection: Ti Re -Inspection required: es ' No IN When corrections have been made, schedule for re -inspection online at. http✓/www.ci.wheatridge.co.uslinspecti„a{i��-"`�,�.__� City of Wheat Ridge Residential Solar PERMIT - 202000229 PERMIT NO: 202000229 ISSUED: 02/06/2020 JOB ADDRESS: 4325 Everett St EXPIRES: 02/05/2021 JOB DESCRIPTION: Installation of solar rooftop PV system, 5.49 kW, no structural required. *** CONTACTS *** OWNER 318-426-0239 SAM BEEK SUB (385)482-0045 LEE HATLEY 180271 BRS FIELD OPS, LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned SUBDIVISION CODE: UA / Unassigned USE: UA / Unassigned BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 16,000.00 FEES Total Valuation 0.00 Residential Solar 500.00 ** TOTAL ** 500.00 *** COMMENTS *** *** CONDITIONS *** Approved per plans and red -line notes on plans. Must comply with 2012 IRC, 2017 NEC and all applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections. I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications; applicable bLwnerofthe ng codes, and alt applicable municipal codes, policies and procedures, and that 1 am the legal owner or have been authorized by the legal property and amauthorizetoobtainthis permit and perform the work described and approved in conjunction with this permit.her attestthat I amleallyauthorizd to include all entitiesnamedwithin this documntas partiestothework tobe performed aat all work to be performed is disclosed in this document and/or its' accom�anyin aprg plans anspe,ifIcatons. 131gnature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180.days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees andprocedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any applicable code or any ordinance joregulation of this jurisdiction. Approval of work is subject to field inspection. F Signature of Chief Building O ficial Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. t-� City of lheat d ,e O mmumTY DEVELOPMENT Building & Inspection Services 7500 W. 2911 Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permits(a-)ci.wheatridge.co.us FOR OFFICE USE ONLY Date: �v0-%2 C Plan/Permit # Plan Review Fe 'o Qu Building Permit Application *** Complete all applicable highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: Property Owner 4325 Everett Street, Wheat Ridge, Colorado, 80033, United States Sam Beck Property Owner Email: spbeck12@yahoo.com Tenant Name (Commercial Projects Only) Property Owner Mailing Address: (if different than property address) Address: Same as property address Citv. State Architect/Engineer: Architect/Engineer E-mail: Contractor Name: BRS Field Ops LLC City of Wheat Ridge License #: 180271 Phone: Phone: Contractor E-mail Address: permitting.department@blueravensolar.com For Plan Review Questions $ Comments (please print): CONTACT NAME (please print): CONTACT EMAIL(p/ease print): Linsey McClain Phone: 385-482-0045 Phone: 385-482-0045 permitting.department@blueravensolar.com Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form): Electrical: Plumbing: Mechanical: W.R. City License # W.R. City License # W.R. City License # Other City Licensed Sub: Other City Licensed Sub: City License # City License # Complete all highlighted fields. ❑COMMERCIAL D RESIDENTIAL Provide description of work: For ALL projects, provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc. Residential Solar Rooftop PV System 5.49 kW Sq. Ft./LF 315.2 Amps 150 Squares BTUs n/a Gallons n/a For Solar: 5.49 KW 18 # of Panels n/a Requires Structural For Commercial Projects Only: Occupancy Type: Construction Type: Occupancy Load: Square Footage: _ Project Value: (Contract value or the cost of all materials and labor included in the entire project) C�Do OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLE ONE: (OWNER) (CONTRACTOR) or (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR) ����1�-�� For BRS Field Ops LLC Signature (first and last name): ���?('""" DATE: 01/30/2020 Printed Name: Linsey McClain ZONING COMMMENTS: Reviewer: ►may PUBLIC WORKS COMMENTS: Reviewer: DEPARTNIENT USE ONLY OCCUPANCY CLASSIFICATION: CONSTRUCTION TYPE: Building Division Valuation: �y� 9 Domus Structural Engineering, LLC J o m C T S // P.O. Box 6986 Broomfield, CO 80021 - 1" ii C' { r "f' E '' R . Is 530-864-7055 -EENG 1 NEER T NG T. . C: 6� Domusstructural@gmail.com January 28, 2020 To: Blue Raven Solar 1403 North Research Way, Building J Orem, LIT. 84097 Subject: Certification Letter Beck Residence 4325 Everett Street Wheat Ridge, CO. 80033 To Whom It May Concern, A jobsite observation of the condition of the existing framing system was performed by an audit team of Blue Raven Solar as a request from Domus Structural Engineering. All review is based on these observations and the design criteria listed below and only deemed valid if provided information is true and accurate. On the above referenced project, the roof structural framing has been reviewed for additional loading due to the installation of the solar PV addition to the roof. The structural review only applies to the section of the roof that is directly supporting the solar PV system and its supporting elements. The observed roof framing is described below. If field conditions differ, contractor to notify engineer prior to starting construction. The roof structure of (MP1) consists of composition shingle on roof plywood that is supported by 2x6 rafters @ 24"o.c. with ceiling joists acting as rafter ties. The rafters have a max projected horizontal span of 9'-6", with a slope of 18 degrees. The rafters are connected at the ridge to a and are supported at the eave by a load bearing wall. The existing roof framing system of (MP1) is judged to be adequate to withstand the loading imposed by the installation of the solar panels. No reinforcement is necessary. The spacing of the solar standoffs should be kept at 72" o.c. for landscape and 48" o.c. for portrait orientation, with a staggered pattern to ensure proper distribution of loads. The scope of this report is strictly limited to an evaluation of the fastener attachment, underlying framing and supporting structure only. The attachment's to the existing structure are required to be in a staggered pattern to ensure proper distribution of loading. All panels, racking and hardware shall be installed per manufacturer specifications and within specified design limitations. All waterproofing shall be provided by the manufacturer. Domus Structural Engineering assumes no responsibility for misuse or improper installation of the solar PV panels or racking. Note: Seismic check is not required since Ss<.4g and Seismic Design Category (SDC) < B Design Criteria: • Applicable Codes = 2012 IBC/IRC, ASCE 7-10 • Roof Dead Load = 8 psf (MP1) • Roof Live Load = 20 psf • Wind Speed = 135 mph (Vult), Exposure C, Risk Category II • Roof Snow Load = 30 psf • Attachments: 1 - 5/16" dia. lag screw with 2.5 inch min embedment depth, at spacing shown above. Please contact me with any further questions or concerns regarding this project. Sincerely, UK& Ryan Atwell, P.E. Project Engineer Beck Residence, Wheat Ridge, CO.xlsm 1 Domus Structural Engineering, LLC .#:�! o m u 4 P.O. Box 6986 TR � � C ,T, T { jH A 1 Broomfield, CO 80021 530-864-7055 NG T NE F R T N G T. T{ t; Domusstructural@gmail.com Gravity Loading Roof Snow Load Calculations p9 = Ground Snow Load = 30 psf pf = 0.7 Ce Ct I p9 (ASCE7 - Eq 7-1) Ce = Exposure Factor = 1 (ASCE7 - Table 7-2) Ct = Thermal Factor = 1 (ASCE7 - Table 7-3) 1= Importance Factor = 1 pf = Flat Roof Snow Load = 30.0 psf PS = CSPf (ASCE7 - Eq 7-2) Cs = Slope Factor = 1 ps = Sloped Roof Snow Load = 30.0 psf PV Dead Load = 3 psf (Per Blue Raven Solar) DL Adjusted to 18 Degree Slope 3.15 psf PV System Weight 0.00 (Ceiling Not Vaulted) Weight of PV System (Per Blue Raven Solar) 3.0 psf X Standoff Spacing = 4.00 ft Y Standoff Spacing = 5.50 ft Standoff Tributary Area = 22.00 sft Point Loads of Standoffs 66 Ib Note: PV standoffs are staggered to ensure proper distribution of loading Roof Live Load = 20 psf Note: Roof live load is removed in area's covered by PV array. Roof Dead Load (MPI) Composition Shingle 4.00 Roof Plywood 2.00 2x6 Rafters @ 24"o.c. 1.15 Vaulted Ceiling 0.00 (Ceiling Not Vaulted) Miscellaneous 0.85 Total Roof DL (MP1) 8.0 psf DL Adjusted to 18 Degree Slope 8.4 psf Beck Residence, Wheat Ridge, CO.xlsm 2 Domus Structural Engineering, LLC 0 IkI t1 S P.O. Box 6986 Broomfield, CO 80021 "1` Et_? C: `I'" i k h 530-864-7055 NG T N E ER ING Ll( Domusstructural@gmaii.com Wind Calculations Per ASCE 7-10 Components and Cladding Input Variables Wind Speed 135 mph Exposure Category C Roof Shape Hip/Gable Roof Slope 18 degrees Mean Roof Height 20 ft Effective Wind Area 19.3 ft Design Wind Pressure Calculations Wind Pressure P = qh*G*Cn qh = 0.00256 * Kz * Kzt * Kd * V^2 (Eq. 30.3-1) Kz (Exposure Coefficient) = 0.9 (Table 30.3-1) Kzt (topographic factor) = 1 (Fig. 26.8-1) Kd (Wind Directionality Factor) = 0.85 (Table 26.6-1) V (Design Wind Speed) = 135 mph (Fig. 26.5-1A) Risk Category = II (Table 1.5-1) qh = 35.69 0.6*qh= 21.42 Standoff Uplift Calculations -Portrait Zone 1 Zone 2 Zone 3 Positive GCp = -0.84 -1.39 -2.23 0.38 (Fig. 30.4-1) Uplift Pressure = -17.95 psf -29.77 psf -47.71 psf 13.4 psf X Standoff Spacing = 4.00 4.00 2.67 Y Standoff Spacing = 5.50 2.75 2.75 Tributary Area = 22.00 11.00 7.33 Footing Uplift = -395 Ib -327 Ib -350 Ib Standoff Uplift Calculations -Landscape Zone 1 Zone 2 Zone 3 Positive GCp = -0.84 -1.39 -2.23 0.38 (Fig. 30.4-1) Uplift Pressure = -17.95 psf -29.77 psf -47.71 psf 10.0 psf (Minimum) X Standoff Spacing = 6.00 6.00 4.00 Y Standoff Spacing = 3.50 1.75 1.75 Tributary Area = 21.00 10.50 7.00 Footing Uplift = -377 Ib -313 Ib -334 Ib Standoff Uplift Check 0M ok Maximum Design Uplift = -395 Ib \dge Standoff Uplift Capacity = 450 to 450 Ib capacity > 395 Ib demand `' Ierefore, OK / J\ Fastener Capacity Check Fastener = 1 - 5116" dia- lag Number of Fasteners = 1 Embedment Depth = 2.5 Pullout Capacity Per Inch = 250 Ib Fastener Capacity = 625 Ib w/ F.S. of 1.5 & DOL of 1.6= 667 Ib 667.2 Ib capacity > 395 Ib demand herefore, OK Beck Residence, Wheat Ridge, CO.xlsm 3 omu S E N t J T N F r.. R i l' t w T. T. C: Framing Check (MP1) Dead Load 8.4 psf PV Load 3.2 psf Snow Load 30.0 psf W Governing Load Combo = DL + SL Total Load 41.6 psf Domus Structural Engineering, LLC P.O. Box 6986 Broomfield, CO 80021 530-864-7055 Domusstructural@gmail.com w = 83 plf 2x6 Rafters @ 24"o.c. Member Span = 9'- 6" Member Properties Member Size S (in^3) I (in^4) Lumber Sp/Gr Member Spacing 2x6 7.56 20.80 DF#2 @ 24"o.c. Check Bending Stress Fb (psi) = fb x Cd x Cf x Cr (NDS Table 4.3.1) 900 x 1.15 x 1.3 x 1.15 Allowed Bending Stress = 1547.3 psi Maximum Moment = (wL12) / 8 = 937.8348 ft# = 11254.02 in# Actual Bending Stress = (Maximum Moment) / S = 1488.2 psi Allowed > Actual - 96.2% Stressed -- Therefore, OK Check Deflection Allowed Deflection (Total Load) = L/180 (E = 1600000 psi Per NDS) = 0.633 in Deflection Criteria Based on = Continuous Span Actual Deflection (Total Load) _ (w*L^4) / (185*E*I) = 0.191 in = L/597 > L/180 Therefore OK C,VI of Allowed Deflection (Live Load) = 1-1240 `age 0.475 in heat Actual Deflection (Live Load) _ (w*L^4) / (185*E*I) a 0.138 in"� L/827 > L/240 Therefore OK Check Shear Member Area = 8.3 in12 Fv (psi) = 180 psi (NDS Table 4A) Allowed Shear = Fv * A = 1485 Ib Max Shear (V) = w * L / 2 = 395 Ib Allowed > Actual -- 26.6% Stressed -- Therefore, OK Beck Residence, Wheat Ridge, CO.xlsm 4 GENERAL NOTES AERIAL VIEW CODES AND STANDARDS 1. ALL WORK SHALL COMPLY WITH 2017 NATIONAL ELECTRIC CODE (NEC), 2015 INTERNATIONAL BUILDING CODE (IBC), 2015 INTERNATIONAL RESIDENTIAL CODE (IRC). 2015 INTERNATIONAL PLUMBING CODE (IPC), AND ALL STATE AND LOCAL BUILDING, ELECTRICAL. AND PLUMBING CODES. 2. DRAWINGS HAVE BEEN DETAILED ACCORDING TO UL LISTING REQUIREMENTS. SITE NOTES / OSHA REGULATION 1. A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 2, THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS AN UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 3 THE SOLAR PV INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL. OR BUILDING ROOF VENTS. 4 ROOF COVERINGS SHALL BE DESIGNED, INSTALLED AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SHALL SERVE TO PROTECT THE BUILDING OR STRUCTURE SOLAR CONTRACTOR 1. MODULE CERTIFICATIONS WILL INCLUDE UL1703, IEC61646, IEC61730. 2. IF APPLICABLE MODULE GROUNDING LUGS MUST BE INSTALLED AT THE MARKED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 3. AS INDICATED BY DESIGN, OTHER NRTL LISTED MODULE GROUNDING DEVICES MAY BE USED IN PLACE OF STANDARD GROUNDING LUGS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ 4. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. 5 CONDUIT POINT OF PENETRATION FROM EXTERIOR TO INTERIOR TO BE INSTALLED AND SEALED WITH A SUITABLE SEALING COMPOUND. 6, DC WIRING LIMITED TO MODULE FOOTPRINT W/ ENPHASE AC SYSTEM. 7. ENPHASE WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS. 8. MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC UNLESS NOT AVAILABLE. 9, ALL INVERTERS, MOTOR GENERATORS.. PHOTOVOLTAIC MODULES. PHOTOVOLTAIC PANELS. AC PHOTOVOLTAIC MODULES, DC COMBINERS, DC -TO -DC CONVERTERS, SOURCE CIRCUIT COMBINERS, AND CHARGE CONTROLLERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (B). 10. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. 11. TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS (WHEN PROVIDED) IN ACCORDANCE WITH NEC CODE 110.14(D) ON ALL ELECTRICAL CONNECTIONS. EQUIPMENT LOCATIONS 1. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION [NEC 110.261. 2 EQUIPMENT INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY [NEC 690.31 (A) -(B)] AND [NEC TABLE 310 15 (B)] 3. ADDITIONAL AC DISCONNECTS SHALL BE PROVIDED WHERE THE INVERTER IS NOT ADJACENT TO THE UTILITY AC DISCONNECT OR NOT WITHIN SIGHT OF THE UTILITY AC DISCONNECT. 4 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES 5 ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE APPROVE® r8j-5 K� Reviewed for Code Compliants 1. Mara E>wNner p� �: Al4rw�nry�rl+�Ir��rw�yrrq#�� wla��eeiau sMlwot�e •pwwi�er, rw �wf{ w,wYi� w &V#f rlro A—q►Mekd*vn#aywr0l &4k&awtAw4 .+erw�. ayswe.wp.iy w we�a+arrewwr aln+r � LO�tf 0►OMI�O�IOMd Of 1At OM fAolsOt6! wGa DESIGN CRITERIA WIND SPEED: 135 MPH GROUND SNOW LOAD: 30 PSF WIND EXPOSURE FACTOR: C SEISMIC DESIGN CATEGORY: B SCOPE OF WORK SITE SPECIFICATIONS OCCUPANCY - R3 CONSTRUCTION - V -B ZONING: RESIDENTIAL INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM 11.895 kW DC PHOTOVOLTAIC SOLAR ARRAY ROOF TYPE: Comp Shingle MODULES: (39) Seraphim SEG-6MB-305BB INVERTER(S): Enphase IQ7-60-2-US,---- RACKING: Unirac SFM Infinity BLUE RAVEN SHEETINDEX PV1 - COVER SHEET PV2 - PROPERTY PLAN PV3 - SITE PLAN PV4 - EQUIPMENT & ATTACHMENT DETAIL PV5 - ELECTRICAL SINGLE LINE DIAGRAM PV6 - ELECTRICAL CALCULATIONS & ELECTRICAL NOTES PV7 - MAIN BREAKER DERATE CALCS. (IF NEEDED) PV8 - LABELS & LOCATIONS PV9 - CUSTOM DIRECTORY PLACARD (IF NEEDED - NEC 690.56(B)) Approval Notes: 1) PV array system to have grounding system installed per Part III of Article 250 per 2017 NEC Art.690.47(A) 2) If LIFER ground is not available provide or verify supplemental ground rods per 2017 NEC Art.250.104(B) 3) Natural Gas piping to be bonded per 2017 NEC Art. 250.104(B). N'4' rf CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 1403 N RESEARCH WAY, BUILDING J OREM.. UT 84097 800-377-4480 rsrti I WWW BLUERAVENSOLAR.COM co CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE i USED FOR THE BENEFIT OF � O CC) ANYONE EXCEPT 1 BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN O M PART TO OTHERS OUTSIDE !" RECIPIENTS ORGANIZATION. i EXCEPT IN CONNEC TION WITH THE LLI N w SALE AND USE OF THE RESPECTIVE a -) EQUIPMENT, WITHOUT THE a) WRITTEN PERMISSION OF BLUERAVENSOLAR LLC SHEETINDEX PV1 - COVER SHEET PV2 - PROPERTY PLAN PV3 - SITE PLAN PV4 - EQUIPMENT & ATTACHMENT DETAIL PV5 - ELECTRICAL SINGLE LINE DIAGRAM PV6 - ELECTRICAL CALCULATIONS & ELECTRICAL NOTES PV7 - MAIN BREAKER DERATE CALCS. (IF NEEDED) PV8 - LABELS & LOCATIONS PV9 - CUSTOM DIRECTORY PLACARD (IF NEEDED - NEC 690.56(B)) Approval Notes: 1) PV array system to have grounding system installed per Part III of Article 250 per 2017 NEC Art.690.47(A) 2) If LIFER ground is not available provide or verify supplemental ground rods per 2017 NEC Art.250.104(B) 3) Natural Gas piping to be bonded per 2017 NEC Art. 250.104(B). N'4' rf CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 DRAWING BY J-hun Kim DATE December 27, 2019 PROJECT NUMBER 71689656 SHEET NAME COVER SHEET I . PACE NUMBER REVISION PV1 0 • CY) co S O O CC � O CC) z O M O Q p LL Z U c co i p U LLI N w LU (W a -) N c a) U) 0 DRAWING BY J-hun Kim DATE December 27, 2019 PROJECT NUMBER 71689656 SHEET NAME COVER SHEET I . PACE NUMBER REVISION PV1 0 • 138'-10" W M 13 a O o MSP N 2 Pv 70 LL AC CU JB JB " 72'-3 z 0 O (ElV N LL M E3 O JB di df W df d& dk DC SYSTEM SIZE: 11.895 kW DC ROOF TYPE: Comp Shingle (39) Seraphim SEG-6MB-3051313 Enphase IQ7-60-2-US,----INVERTER N LEGEND INV INVERTER & DC DISCONNECT BLUE RAVEN SUB (E) SUBPANEL M LC (N) LOAD CENTER 1403 N RESEARCH WAY, BUILDING J O OREM. UT 84097 AC ❑ AC DISCONNECT O O 800-377-4480 00 WWW. BLUE RAVENSOLAR.COM a UTILITY METER CONFIDENTIAL - THE INFORMATION MSP F MAIN SERVICE PANEL HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF JB JUNCTION BOX ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT O BE DISCLOSED IN WHOLE OR IN TS TRANSFER SWITCH PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION.. N EXCEPT IN CONNEC TION WITH THE FCOMBINER BOX/AGGREGATOR SALE AND USE OF THE RESPECTIVE PV S PV REVENUE METER EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF LLC. ®BLUERAVENSOLAR FIRE SETBACK C 2 O -0 EMT CONDUIT RUN W (TO BE DETERMINED IN FIELD) NV ABCEP O U) CERTIFIED PV INSTALLATION PV WIRE sTRING i i � PROFESSIONAL j PROPERTY LINE Scott Gurney (n tj # PV -011719-015866 SCALE: 1/16" = V-0" CONTRACTOR. BRS FIELD OPS 385.498.6700 N G`\11 °f DATE Fz�ac�e December 27, 2019 PROJECT NUMBER 71689656 SHEET NAME PROPERTY PLAN PAGE NUMBER REVISION PV2 0 Co M O O O 00 00 O Z CoC O o LLI N Q U) U 2 O C 2 O -0 -� W L v O U) z � � W (n N (n tj C/) Co 0 DRAWING BY J-hun Kim G`\11 °f DATE Fz�ac�e December 27, 2019 PROJECT NUMBER 71689656 SHEET NAME PROPERTY PLAN PAGE NUMBER REVISION PV2 0 14'-9" I DC SYSTEM SIZE: 11.895 kW DC ROOF TYPE: Comp Shingle (39) Seraphim SEG-6MB-305BB Enphase IQ7-60-2-US,----INVERTER 14'-9" MP2 # OF MODULES: 11 AZIMUTH:90° U I PITCH:19° TSRF:78% AREA: 436 SQ. FT MP3 # OF MODULES: 10 ffC ffC ffC M ffC ffC ffC MSP PV AZIMUTH:270° �c L�c AC L�c LIQ L�c L�c PITCH:19° 800-377-4480 o zE M UTILITY METER WWW BLUERAVENSOLAR COM CONFIDENTIAL - THE INFORMATION O( o w TSRF:76% MSP MAIN SERVICE PANEL PS P HEREIN CONTAINED SHALL NOT BE N AREA: 528 SQ. FT � W2 JB JUNCTION BOX El O -0 u- BE DISCLOSED IN WHOLE OR IN TS TRANSFER SWITCH E 50'-7" Lu RECIPIENTS ORGANIZATION, W j N N HV) CNI O J B ❑C COMBINER BOX/AGGREGATOR SALE AND USE OF THE RESPECTIVE Sealed For O EQUIPMENT, WITHOUT THE PV PV REVENUE METER DC SYSTEM SIZE: 11.895 kW DC ROOF TYPE: Comp Shingle (39) Seraphim SEG-6MB-305BB Enphase IQ7-60-2-US,----INVERTER 14'-9" MP2 # OF MODULES: 11 AZIMUTH:90° U I PITCH:19° TSRF:78% AREA: 436 SQ. FT 7 n 31'-5" rl N Lc I — ffC ffC ffC M ffC ffC ffC MSP PV 0 �c L�c AC L�c LIQ L�c L�c 7 n 31'-5" rl N Lc I — ffC ffC ffC ffC ffC ffC ffC ffC ffC J B �c L�c L�c L�c LIQ L�c L�c L�c 60'-7" MP1 # OF MODULES: 18 AZIMUTH:180° PITCH:19° TSRF:87% AREA: 561 SQ. FT LEGEND 0 NV INVERTER & DC DISCONNECT BLUE RAVEN SUB (E) SUBPANEL LC (N) LOAD CENTER 1403 N RESEARCH WAY, BUILDING J o OREM. UT 84097 AC AC DISCONNECT o 00 rn 00 800-377-4480 o zE M UTILITY METER WWW BLUERAVENSOLAR COM CONFIDENTIAL - THE INFORMATION O( o w MSP MAIN SERVICE PANEL PS P HEREIN CONTAINED SHALL NOT BE N USED FOR THE BENEFIT OF � W2 JB JUNCTION BOX ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT O -0 u- BE DISCLOSED IN WHOLE OR IN TS TRANSFER SWITCH E PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, W j N N HV) CNI EXCEPT IN CONNEC TION WITH THE ❑C COMBINER BOX/AGGREGATOR SALE AND USE OF THE RESPECTIVE Sealed For EQUIPMENT, WITHOUT THE PV PV REVENUE METER WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. FIRE SETBACK ® EMT CONDUIT RUN 943019 : (TO BE DETERMINED IN FIELD) NABC E P \, wr� w;w+ [CERTIFIED - PV INSTALLATION SHEET NAME PV WIRE STRING ww.M... PROFESSIONAL 41' i PROPERTY LINE Scott Gurney PAGE NUMBER # PV -011719-015866 SCALE: 1/8" = V-0" CONTRACTOR: PV3 a E 16BRS FIELD OPS 385.498.6700 0 o ,n o 00 rn 00 o zE M O( o w Q U) U N 14'-9" � W2 9'-7" O -0 u- Lu C/) Z U O W j N N HV) CNI (n i� p Sealed For F Existing Roof & f L� Attachment Only ­Aqe - er 27, 2019 071689656 943019 : ER wr� w;w+ SHEET NAME ww.M... SITE PLAN PAGE NUMBER REVISION 1;27/2020 PV3 0 PV ARRAY INFORMATION PV MODULE COUNT: 39 MODULES # OF ATTACHMENT POINTS: 80 ARRAY AREA: Module Count x 17.51ft2 = 682.9ft2 ROOF AREA: 1087.0ft2 % OF ARRAY/ROOF: 62.8% ARRAY WEIGHT: Module Count x 50lbs = 1950.Olbs DISTRIBUTED LOAD: Array Weight - Array Area = 2.86 IbS/ft2 POINT LOAD: Array Weight _ Attachments = 24.4lbs/attachment LL LL O 0 Z FF -- U) a- o O t�-- w 1 J= 0 co 0 U J_ (n Q H w 0 U Infinity IMRAIL Seraphim SEG-6MB-305BB PV MODULE (E) ROOF MEMBRANE UNIRAC SLIDERS AND TRIMRAIL ROOF ATTACHMENTS FLASHING 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER (E) BUILDING STRUCTURE Unirac SFM Infinity Seraphim SEG-6MB-305BB PV MODULE (E) ROOF MEMBRANE UNIRAC SLIDERS FLASHING 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN, EMBEDMENT AND FLAT WASHER (E) BUILDING STRUCTURE PV MODULE (BEHIND TRIM RAIL) Unirac SFM Infinity TRIM RAIL PORTRAIT SFM Infinity Flashkit RACKING ATTACHMENTS TO BE STAGGERED BY SHIFTING EACH Unirac SFM Infinity FRAME SUBSEQUENT ROW OF ATTACHMENTS ONE RAFTER OVER, / H� G /CV 4) r� LANDSCAPE ARRAY DETAIL, FRONT VIEW Scale: 3/8" = V-0" PORTRAIT LANDSCAPE ZAY DETAIL, SIDE VIEW ROOF TYPE: Comp Shingle ROOF FRAMING TYPE: Manufactured Truss RAFTER OR TOP CHORD(TRUSS) 2x4 @ 24"O.C. CEILING JOIST OR BOTTOM CHORD(TRUSS) 2x4 @ 24"O.C. Scale: 3/8" = V-0" Sealed For Existing Roof & Attachment Only BLUE RAVEN 1403 N RESEARCH WAY, BUILDING J OREM. UT 84097 800-377-4480 WWW BLUERAVENSOLAR COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION. EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT. WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 DATE December 27, 2019 PROJECT NUMBER 71689656 SHEET NAME EQUIP. DETAIL PAGE NUMBER REVISION PV4 0 cY O O O CC) 00 O ZM � � O o w Q N co U 2 CK O -0 ca -a w LL L v m W LU (D N U) (.0 >� U) �O DRAWING BY J-hun Kim DATE December 27, 2019 PROJECT NUMBER 71689656 SHEET NAME EQUIP. DETAIL PAGE NUMBER REVISION PV4 0 (1) 6 AWG THHN/THWN-2, CU., BLACK (L1) 39.0 A AC (3) 10 AWG THHN/THWN-2, CU., BLACK (Ll) MAX 13.0 A A (1) 12 - 2 OF -B W/G, THHN/THWN-2, SOLID CU. MAX 13.0 A A (1) 12-2 TC-ER,THHN/THWN-2, CU. MAX 13.0 A AC 15 (1) 6 AWG THHN/THWN-2, CU., RED (1-2) 240 V AC (1) 10 AWG THHN/THWN-2, CU., WHITE (N) (3) 10 AWG THHN/THWN-2, CU., RED (L 2) 240 V A (1) 10 AWG THHN/THWN-2, CU., GREEN (EGC) 240 V A 1 (1) 6 AWG BARE, CU (EGC) 240 V AC (1) 10 AWG THHN/THWN-2, CU.. GREEN (EGC) (1) 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT EXTERIOR INTERIOR EXTERIOR BLUE RAVEN (1) 6 AWG THHN/THWN-2, CU., BLACK (Ll) 39.0 A AC Approval Notes: 1 L (1) 6 AWG THHN/THWN-2, CU., RED (L2) 240 V AC U 1) PV array system to have a grounding system installed per (1) 6 AWG THHN/THWN-2, CU., WHITEN) 1403 N RESEARCH WAY BUILDING J Part III of Article 250 per 2017 NEC Art.690.47(A) (1) 3/4 INCH EMT EXTERIOR 2)If UFER ground is not avail provide or verify suppl. ground OREM. UT 84097 rods per 2017 NEC Art.250.104(B) 800-377-4480 1. ALL CONDUIT TO BE RAN AT LEAST 7/8" ABOVE ROOF SURFACE WHERE EXPOSED TO SUNLIGHT. 3) Natural Gas piping to be bonded s per 2017 NEC Art. W W W. BLUERAV ENSOLAR.COM CONFIDENTIAL - THE INFORMATION 2. TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS (WHEN PROVIDED) IN ACCORDANCE WITH NEC CODE 110.14(D) ON ALL ELECTRICAL CONNECTIONS. 250.104(B). ,9) Seraphim SEG-6MB-305BB HEREIN CONTAINED SHALL NOT BE 3. CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND UL 1703 COMPLIANT USED FOR THE BENEFIT OF ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. (39) Enphase IQ7-60-2-US MICRO INVERTERS ANYONE EXCEPT UL 1741 COMPLIANT BLUERAVENSOLAR NOR SHALL IT 7 MODULES MAX FOR ALL SUB -BRANCH BE DISCLOSED IN WHOLE OR IN CIRCUIT(S) TO COMPLY WITH VRISE CALCS PART TO OTHERS OUTSIDE Enphase IQ Combiner 3 JUNCTION BOX RECIPIENTS ORGANIZATION X-IQ-AM1-240-3 (OPTIONAL IF OF -B EXCEPT IN CONNEC TION WITH THE SUPPLY SIDE CONNECTION (SOLAR LOADS ONLY) CABLE USED FOR JUNCTION BOX SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE PER NEC 230.46, NEC 230.79(D), ENTIRE HOMERUN) WRITTEN PERMISSION OF (E)200A MAIN SERVICE PANEL NEC 705.12(A) _ _ = BLUERAVENSOLAR LLC (E)200A / 2P MAIN BREAKER UTILITY PV (N)20A/2P (1) CIRCUIT PV AC DISCONNECT PRODUCTION u u u OF 13 MODULES (E FUSED, 100kAIC - R METER 200A L2 L2 (E)200A / 2P LOCKABLE, VISIBLE OPEN LEVER BYPASS G G i 14,E A `B C E P'\ L SERVICE RATED 60A, 240V, 2 -POLE METER SOCKET Lt G CERTIFI=ED PV INSTALLATION I 2 ' LOADS JUNCTION BOX PROFESSIONAL 50A Scott Gurney FUSES _ (1) CIRCUIT — # PV -011719-015866 CLASS R (N)20A/2P OF 13 MODULES jT CONTRACTOR: LL z N N " Gc N G G G BRS FIELD OPS F— 385.498.6700 120/240 VAC 60HZ 1 PHASE TO UTILITY 16 15 ENPHASE COMBINER BOX WILL BE 2 1 GRID ACCESSIBLE TO UTILITY COMPANY 24/7 JUNCTION BOX U _ (N)20A/2P (1) CIRCUIT = _ 0 (N) 6 AWG COPPER, SOLID (GEC) N u u u OF 13 MODULES coco TO BE IRREVERSIBLY SPLICED cec TO GEC o (E) (E) GROUNDING L c c c Ln O 00 00 00 _ ELECTRODE(S) O 3 2 1 Z O 4) 0 W N Q U)U W PV Production meter notes: ( I (j 1. The self-contained metering will be in compliance O O LU with the most recent revision of the Xcel L Energy Standard; specifically Section 4.11. 1 Z U (� U) INTERCONNECTION NOTES 2. The PV production meter will be required to have N U) 1. SUPPLY SIDE INTERCONNECTION ACCORDING TO [NEC705.12(A)]. the PV generation wired to the line side terminals L1J 2. SUPPLY SIDE PV DISCONNECT SHALL BE LISTED AS SUITABLE FOR USE AS (top of meter block). ¥ C,I— M > Q SERVICE EQUIPMENT [NEC 690.13(C)] 3. The meter socket for the PV production meter shall 3. SUPPLY SIDE PV DISCONNECT IS GROUNDED AND BONDED AS A SERVICE WITH A be marked with a stamped brass, aluminum, or ,.w SEPARATE SUPPLY SIDE BONDING JUMPER SIZED PER [NEC 250.102(C)(1)] TO stainless steel tag, indicating the address including "PV ° "" _ T{ r J-,, tun Kim the unit, typically PROD" in accordance with CONNECT TO THE EXISTING RESIDENCE GROUNDING ELECTRODE SYSTEM BY A the requirements for "Meter Identification" in Section NEW GROUNDING ELECTRODE CONDUCTOR SIZED PER [NEC 250.66]. THE EXISTING 4.14.4 of the Xcel Energy Standard. GROUNDING ELECTRODE SYSTEM TO COMPLY WITH [NEC 250 III]. [NEC 690.47]. 4. The PV production meter shall be located within' _ < December 27, 2019 ten (10) feet of the existing utility meter. If there DISCONNECT NOTES is any reason this cannot be accomplished, a site PROJECT NUMBER 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS plan showing proposed equipment locations 716$9656 OPENED THE CONDUCTORS REMAINING LIVE ARE CONNECTED TO THE shall be submitted for review. The local meter TERMINALS MARKED "LINE SIDE" (TYPICALLY THE UPPER TERMINALS) shop must approve the site plan for application SHEET NAME 2. AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE approval; site meetings can be arranged upon LOCKABLE, AND BE A VISIBLE -BREAK SWITCH request. ELEC. 3 LINE DIAG. ` '' NOTE TO INSTALLER: The current Placard that we require PAGE NUMBER REVISION at the utility meter and AC Disconnect is a yellow with black PV5 lettering MUUULt JP tL.l r ILA I I UINJ 5erapn I m StCrbIVIb-JU7tSt5 RATED POWER (STC) 305 W MODULE VOC 39.9 V DC MODULE VMP 32.3 V DC MODULE IMP 9.45 A DC MODULE ISC 9.76 A DC VOC CORRECTION -0.28 %/°C VMP CORRECTION -0.38 %/°C SERIES FUSE RATING 20 A DC ADJ. MODULE VOC @ ASHRAE LOW TEMP 44.3 V DC ADJ. MODULE VMP @ ASHRAE 2% AVG. HIGH TEMP 27.4 V DC IV11%_nU I1NV Lr\I Cr\Jr L%_1r-Il.N I1 VIM -3 CII[ HCIi CIIjI-VV-L-VJ POWER POINT TRACKING (MPPT) MIN/MAX 22 - 48 V DC MAXIMUM I NPUT VOLTAGE 48 V DC MAXIMUM DC SHORT CIRCUIT CURRENT 15 A DC MAXIMUM USABLE DC INPUT POWER 350 W MAXIMUM OUTPUT CURRENT 1 A AC AC OVERCURRENT PROTECTION 20 A MAXIMUM OUTPUT POWER 240 W CEC WEIGHTED EFFICIENCY 97% AL PHU [UVULA IIL MUUULt MAKKINb (NLL bJU.SZ) NOMINAL OPERATING AC VOLTAGE 240 V AC NOMINAL OPERATING AC FREQUENCY 47- 68 HZ AC MAXIMUM AC POWER 240 VA AC MAXIMUM AC CURRENT 1.0 A AC MAXIMUM OCPD RATING FOR AC MODULE 20 A AC DESIGN LOCATION AND TEMPERATURES TEMPERATURE DATA SOURCE ASHRAE 2% AVG. HIGH TEMP STATE Colorado CITY Wheat Ridge WEATHER STATION SALISBURY WICOMICO CO AP ASHRAE EXTREME LOW TEMP (°C) -14 ASHRAE 2% AVG. HIGH TEMP (-C) 33 SYSTEM ELECTRICAL SPECIFICATIONS CIR 1 CIR 2 CIR 3 CIR 4 CIR 5 CIR 6 NUMBER OF MODULES PER MPPT DC POWER RATING PER CIRCUIT (STC) TOTAL MODULE NUMBER STC RATING OF ARRAY AC CURRENT @ MAX POWER POINT (IMP MAX. CURRENT (IMP X 1.25) OCPD CURRENT RATING PER CIRCUIT MAX. COMB. ARRAY AC CURRENT (IMP) MAX. ARRAY AC POWER 13 3965 13 3965 13 1 3965 VRISE SEC. 1(MICRO TO JBOX) 25.2 12 Cu. 39 MODULES 11895W DC 13.0 16.25 20 13.0 16.25 20 13.0 16.25 20 12 Cu. 2.36 242.36 39.0 9360W AC AC VOLTAGE RISE CALCULATIONS DIST (FT) COND. ✓RISE(V) VEND(V; %VRISE IQ7-7 VRISE SEC. 1(MICRO TO JBOX) 25.2 12 Cu. 0.71 240.71 0.30% VRISE SEC. 2 (JBOX TO COMBINER BOX) 45 12 Cu. 2.36 242.36 0.98% VRISE SEC. 3 (COMBINER BOX TO POI) 5 6Cu. 0.20 240.20 0.08% TOTALVRISE 16.3 JUNCTION BOX TO 3.27 243.27 1.36% PHOTOVOLTAIC AC DISCONNECT OUTPUT LABEL (NEC 690.54) AC OUTPUT CURRENT 39.0 A AC NOMINAL AC VOLTAGE 240 V AC GROUNDING NOTES 1. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH [NEC 690-47] AND [NEC 250-501 THROUGH [NEC 250-60] SHALL BE PROVIDED. PER NEC, GROUNDING ELECTRODE SYSTEM OF EXISTING BUILDING MAY BE USED AND BONDED TO AT THE SERVICE ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, OR IS ONLY METALLIC WATER PIPING, A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT GROUND ROD WITH ACORN CLAMP. 2, THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL (OR INVERTER) IF SMALLER THAN #6 AWG COPPER WIRE PER NEC 250-64B. THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS AT BUSBARS WITHIN LISTED EQUIPMENT PER [NEC 250.64C.). 3. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN #8 AWG AND NO GREATER THAN #6 AWG COPPER AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM. 4. PV SYSTEM SHALL BE GROUNDED IN ACCORDANCE TO [NEC 250.211, [NEC TABLE 250.1221, AND ALL METAL PARTS OR MODULE FRAMES ACCORDING TO [NEC 690.46]. 5. MODULE SOURCE CIRCUITS SHALL BE GROUNDED IN ACCORDANCE TO [NEC 690.42]. 6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDED CONDUCTOR TO ANOTHER MODULE. 7 EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTIONS POINTS IDENTIFIED IN THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 8. ENCLOSURES SHALL BE PROPERLY PREPARED WITH REMOVAL OF PAINT/FINISH AS APPROPRIATE WHEN GROUNDING EQUIPMENT WITH TERMINATION GROUNDING LUGS. 9. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE.. AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR DIRECT BURIAL 10. GROUNDING AND BONDING CONDUCTORS SHALL BE COPPER, SOLID OR STRANDED, AND BARE WHEN EXPOSED. 11. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZE ACCORDING TO [NEC 690.451 AND BEA MINIMUM OF #10AWG WHEN NOT EXPOSED TO DAMAGE (#6AWG SHALL BE USED WHEN EXPOSED TO DAMAGE). 12. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLOR CODED GREEN (OR MARKED GREEN IF #4 AWG OR LARGER) 13. ALL CONDUIT BETWEEN THE UTILITY AC DISCONNECT AND THE POINT OF CONNECTION SHALL HAVE GROUNDED BUSHINGS AT BOTH ENDS 14. SYSTEM GEC SIZED ACCORDING TO [NEC 690.47], [NEC TABLE 250.66], DC SYSTEM GEC SIZED ACCORDING TO [NEC 250.1661. MINIMUM #8AWG WHEN INSULATED. #6AWG WHEN EXPOSED TO DAMAGE. 15. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH 250.134 OR 250.136(A) REGARDLESS OF VOLTAGE. WIRING & CONDUIT NOTES 1. ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS PURPOSE AND APPROVED FOR THE SITE APPLICATIONS 2. BOLTED CONNECTION REQUIRED IN DC DISCONNECTS ON THE WHITE GROUNDED CONDUCTOR (USE POLARIS BLOCK OR NEUTRAL BAR) 3. ANY CONNECTION ABOVE LIVE PARTS MUST BE WATERTIGHT. REDUCING WASHERS DISALLOWED ABOVE LIVE PARTS, MEYERS HUBS RECOMMENDED 4. UV RESISTANT CABLE TIES(NOT ZIP TIES) USED FOR PERMANENT WIRE MANAGEMENT OFF THE ROOF SURFACE IN ACCORDANCE WITH NEC 110.2,110.3(A -B). 300.4 5. SOLADECK JUNCTION BOXES MOUNTED FLUSH W/ROOF SURFACE TO BE USED FOR WIRE MANAGEMENT AND AS FLASHED ROOF PENETRATIONS FOR INTERIOR CONDUIT RUNS. 6. ALL PV CABLES AND HOMERUN WIRES BE TYPE USE -2. AND SINGLE -CONDUCTOR CABLE LISTED AND IDENTIFIED AS PV WIRE, TYPE TC -ER, OR EQUIVALENT: ROUTED TO SOURCE CIRCUIT COMBINER BOXES AS REQUIRED 7. ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED ACCORDING TO [NEC CnNnl ICTnR S17F CAI Cl It ATIONS MICROINVERTER TO MAX. SHORT CIRCUIT CURRRENT (ISC) = 13.0 A AC JUNCTION BOX (1) MAX. CURRENT (ISC X 1.25) = 16.3 A AC CONDUCTOR (TC -ER, COPPER (90°C)) = 12 AWG CONDUCTOR RATING = 30 A AMB. TEMP. AMP. CORRECTION = 0.96 ADJ USTEDAMP. = 28.8 > 16.3 JUNCTION BOX TO MAX. SHORT CIRCUIT CURRRENT (ISC) = 13.0 A AC JUNCTION BOX (2) MAX. CURRENT (ISC X1.2S) = 16.3 A AC CONDUCTOR (UF -B, COPPER (60°C)) = 12 AWG CONDUCTOR RATING= 20 A CONDUIT FILL DERATE = 1 AMB. TEMP. AMP. CORRECTION = 0.96 ADJUSTED AMP. = 19.2 > 16.3 JUNCTION BOX TO MAX. SHORT CIRCUIT CURRRENT (ISC) = 13.0 A AC COMBINER BOX (3) MAX. CURRENT (ISC X1.25) = 16.3 A AC CONDUCTOR (UF -B, COPPER (60°C)) = 10 AWG CONDUCTOR RATING = 30 A CONDUIT FILL DERATE = 0.8 AMB. TEMP. AMP. CORRECTION = 0.96 ADJUSTED AMP. = 23.04 > 16.3 COMBINER BOX TO INVERTER RATED AMPS = 39.0 A AC MAIN PV OCPD (15) MAX. CURRENT (RATED AMPS X1.25) = 48.75 A AC CONDUCTOR (THWN-2, COPPER (75°C TERM.)) = 6 AWG CONDUCTOR RATING = 65 A CONDUIT FILL DERATE = 1 AMB. TEMP. AMP. CORRECTION = 0.96 ADJUSTED AMP. = 62.4 > 48.8 690.8] FOR MULTIPLE CONDUCTORS 8. ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE INSTALLED AT LEAST 7/8" ABOVE THE ROOF SURFACE AND DERATED ACCORDING TO [NEC TABLE 310.15 (B)(2)(a), NEC TABLE 310.15(13)(3)(a),& NEC 310.15(13)(3)(c)]. 9. EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE -2, 90°C RATED, WET AND UV RESISTANT, AND UL LISTED RATED FOR 600V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT WIRE FROM SHARP EDGES 10. PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHN/THWN-2 INSULATED, 90°C RATED, WET AND UV RESISTANT, RATED FOR 600V 11. 4 -WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER VOLTAGE TO GROUND MARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE MEANS. 12. ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION 13. VOLTAGE DROP LIMITED TO 2% FOR DC CIRCUITS AND 3% FOR AC CIRCUITS 14. NEGATIVE GROUNDED SYSTEMS DC CONDUCTORS SHALL BE COLOR CODED AS FOLLOWS: DC POSITIVE- RED (OR MARKED RED), DC NEGATIVE- GREY (OR MARKED GREY) 15. POSITIVE GROUNDED SYSTEMS DC CONDUCTORS COLOR CODED: DC POSITIVE- GREY (OR MARKED GREY), DC NEGATIVE- BLACK (OR MARKEJBLA) 16. AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE A OR L1- BLACK, PHASE B OR L2- RED, PHASE C OR L3- BLUE, NEUTRWHITE/GRAY USE -2 IS NOT INDOOR RATED BUT PV CABLE IS RATED THWN/THWN-2 ANDBE USED INSIDE� ** USE -2 IS AVAILABLE AS UV WHITE 17. RIGID CONDUIT, IF INSTALLED, (AND/OR NIPPLES) MUST HAVE A PULL BUS0 PROTECT WIRES. 18. IF CONDUIT DETERMINED TO BE RAN THROUGH ATTIC IN FIELD THEN CONDUIT WILL BE EITHER EMT, FMC, OR MC CABLE IF DC CURRENT COMPLYING WITH NEC 690.31, NEC 250.118(10) DISCONNECTING MEANS SHALL COMPLY WITH 690.13 AND 690.15 19. CONDUIT RAN THROUGH ATTIC WILL BE AT LEAST 18" BELOW ROOF SURFACE COMPLYING WITH NEC 230.0(4) AND SECURED NO GREATER THAN 6' APART PER NEC 330.30(B). BLUE RAVEN 1403 N RESEARCH WAY.. BUILDING J OREM.. UT 84097 800-377-4480 WWW BLUERAVENSOLAR.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT. WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC ABCEP", C_E_RTIFIE _ PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 O b W 70 C -0 Cu L L U U N � CO U L0 O O W N U) 75 W I-_ C0 U) 0 DRAWING BY J-hun Kim T December 27, 2019 PROJECT NUMBER 71689656 SHEET NAME ELEC. CALCS. PAGENUMBER REVISION Pw6 0 ELECTRIC SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED — IN THE OPEN POSITION — DIRECT CURRENT PHOTOVOLTAIC POWER SOURCE MAXIMUM VOLTAGE VDC MAX CIRCUIT CURRENT AMPS RATED AC OUTPUT CURRENT A NOMINAL OPERATING AC VOLTAGE V ,1VARNING DUAL POWER SUPPLY SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM A,V'VARNIIIG INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE LABEL 1 FOR PV DISCONNECTING MEANS WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION [NEC 690.13(8). NEC 705.22] LABEL 2 AT EACH DC DISCONNECTING MEANS. INCLUDING THE DC DISCONNECT AT THE INVERTER. [NEC 690 53. NEC 690.13(B)] LABEL 3 AT POINT OF INTERCONNECTION.. MARKED AT AC DISCONNECTING MEANS. [NEC 690.54.. NEC 690.13 (B)] LABEL 4 AT POINT OF INTERCONNECTION FOR EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUTS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FORM MULTIPLE SOURCES, EACH SERVICE EQUIPMENT AND ALL ELECTRIC POWER PRODUCTION SOURCE LOCATIONS [NEC 705.12(8)(3)] LABEL 5 PLACED ADJACENT TO THE BACK -FED BREAKER FROM THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE CONNECTION TO BUSBAR. [NEC 705.12(13)(2)(3)(b)] SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE 'OFF' POSITION TO sm/Asccr�t SHJT DOWN PV SYSTEM wNnas AND REDUCE SHOCKHAZARD iNTHEARRAY LABEL 7 AT DIRECT-CURRENT EXPOSED RACEWAYS. CABLE TRAYS. COVERS AND ENCLOSURES OF JUNCTION BOXES, AND OTHER WIRING METHODS: SPACED AT MAXIMUM 1DFT SECTION OR WHERE SEPARATED BY ENCLOSURES. WALLS, PARTITIONS, CEILINGS, OR FLOORS [NEC 690-31(G)(3&4)] LABEL 8 FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(A)] WARNING � I 1 LABEL9 POWER TO THIS BUILDING IS ALSO i R � p Qil 11224111 1 FOR PV SYSTEMS THAT ONLY SHUT DOWN SUPPLIED FROM MAIN DISTRIBUTION WAIIM+ ' i , p CONDUCTORS LEAVING THE ARRAY. UTILITY DISCONNECT LOCATED SIGN TO BE LOCATED ON OR NO MORE THAN 3 TURN RAPID SHUTDOWN SMTCH FT AWAY FROM SERVICE DISCONNECTING TO THE'OFF POSITION TO SHUT DOWN CONDUCTORS ------ MEANS TO WHICH THE PV SYSTEMS ARE OUTSIDE THE ARRAY CONNECTED AND SHALL INDICATE THE CONDUCTORS WTHIN LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN THE ARRAY REMAN ENERGIZED N SUNLIGHT u SWITCHES IF NOT AT THE SAME LOCATION, [NEC 690.56(C)(1)(B)] & WARNING LABEL 11 POWER TO THIS BUILDING IS ALSO SUPPLIED NO DC WIRES PRESENT SIGN LOCATED AT AC COMBINER BOX FOR FROM ROOF MOUNTED SOLAR ARRAY. SOLAR ALL MICRO -INVERTER / AC MODULE ARRAY RAPID SHUTDOWN DISCONNECT IS RAPID SHUTDOWN TEST INSTALLS (IF APPLICABLE) LOOATEDOUTSIDE NEXrTO UTILITY METER. NOT REQUIRED LABELING DIAGRAM FOR MICRO INV.: MAIN SERVICE PANEL LABEL 16 PERMANENT DIRECTORY TO BE LOCATED AT SOLAR ARRAY RAPID SHUTDOWN SWITCH DENOTING THE LOCATION OF THE SERVICE EQUIPMENT LOCATION IF SOLAR ARRAY RAPID SHUT DOWN DISCONNECT SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN SERVICE DISCONNECTING MEANS [NEC 705.10] LABEL 17 PERMANENT DIRECTORY TO BE LOCATED AT MAIN SERVICE EQUIPMENT DENOTING THE LOCATION OF THE PV RAPID SHUTDOWN SYSTEM DISCONNECTING MEANS IF SOLAR ARRAY RAPID SHUT DOWN DISCONNECT SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN SERVICE DISCONNECTING MEANS [NEC 705.10. NEC 690.56(C)(1)] Nr__ BLUE RAVEN 1403 N RESEARCH WAY BUILDING J OREM. UT 84097 800-377-4480 WWW BLU ERAVENSOLAR. COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION,. EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLARLLC. r; NABCEP�\ CE_RTIFIE_D PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 I B 385.498.6700 LABEL 15 ,&p �_�/_/�. �► ' ARNING PERMANENT DIRECTORY TO BE LOCATED AT MAIN SERVICE EQUIPMENT LOCATION IF ALL MAIN DISTRIBUTION UTILITYDISCONNECT(S) ELECTRICAL POWER SOURCE DISCONNECTING POWER TO THIS BUILDING ISALSOSUPPLIED MEANS (SOLAR ARRAY RAPID SHUTDOWN FROM A ROOF MOUNTED SOLAR ARRAY WITH A RAPID SHUTDOWN DISOONNECTING MEANS SWITCH) ARE GROUPED AND IN LINE OF SITE OF GROUPED AND LABELED WITHIN LINE OF SITE MAIN SERVICE DISCONNECTING MEANS. AND 10 FT OF THIS LOCATION. [NEC 690.56(C) & NEC 705 101 WARNING � I 1 LABEL9 POWER TO THIS BUILDING IS ALSO i R � p Qil 11224111 1 FOR PV SYSTEMS THAT ONLY SHUT DOWN SUPPLIED FROM MAIN DISTRIBUTION WAIIM+ ' i , p CONDUCTORS LEAVING THE ARRAY. UTILITY DISCONNECT LOCATED SIGN TO BE LOCATED ON OR NO MORE THAN 3 TURN RAPID SHUTDOWN SMTCH FT AWAY FROM SERVICE DISCONNECTING TO THE'OFF POSITION TO SHUT DOWN CONDUCTORS ------ MEANS TO WHICH THE PV SYSTEMS ARE OUTSIDE THE ARRAY CONNECTED AND SHALL INDICATE THE CONDUCTORS WTHIN LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN THE ARRAY REMAN ENERGIZED N SUNLIGHT u SWITCHES IF NOT AT THE SAME LOCATION, [NEC 690.56(C)(1)(B)] & WARNING LABEL 11 POWER TO THIS BUILDING IS ALSO SUPPLIED NO DC WIRES PRESENT SIGN LOCATED AT AC COMBINER BOX FOR FROM ROOF MOUNTED SOLAR ARRAY. SOLAR ALL MICRO -INVERTER / AC MODULE ARRAY RAPID SHUTDOWN DISCONNECT IS RAPID SHUTDOWN TEST INSTALLS (IF APPLICABLE) LOOATEDOUTSIDE NEXrTO UTILITY METER. NOT REQUIRED LABELING DIAGRAM FOR MICRO INV.: MAIN SERVICE PANEL LABEL 16 PERMANENT DIRECTORY TO BE LOCATED AT SOLAR ARRAY RAPID SHUTDOWN SWITCH DENOTING THE LOCATION OF THE SERVICE EQUIPMENT LOCATION IF SOLAR ARRAY RAPID SHUT DOWN DISCONNECT SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN SERVICE DISCONNECTING MEANS [NEC 705.10] LABEL 17 PERMANENT DIRECTORY TO BE LOCATED AT MAIN SERVICE EQUIPMENT DENOTING THE LOCATION OF THE PV RAPID SHUTDOWN SYSTEM DISCONNECTING MEANS IF SOLAR ARRAY RAPID SHUT DOWN DISCONNECT SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN SERVICE DISCONNECTING MEANS [NEC 705.10. NEC 690.56(C)(1)] Nr__ BLUE RAVEN 1403 N RESEARCH WAY BUILDING J OREM. UT 84097 800-377-4480 WWW BLU ERAVENSOLAR. COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION,. EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLARLLC. r; NABCEP�\ CE_RTIFIE_D PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 I B 385.498.6700 O O EXISTING SUB PANEL (IF WHERE POINT OF PV COMBINER SUBPANEL - LABEL 6 AA r 1, /� 1 1 ji f�R (., 1 \ G ( ONLY IF 3 OR MORE SUPPLY SOURCES TO 12 13 INTERCONNECTION IS MADE) AC DISCONNECT (IF REQ. 1INSTALLED) IF USED TO COMBINE PV OUTPUT CIRCUITS AC JUNCTION BOX OR AC COMBINER BOX tl V A BUSBAR) 0 THIS EQUIPMENT FED BY MULTIPLE SIGN LOCATED AT LOAD CENTER IF IT CONTAINS 3 OR MORE POWER SOURCES. ❑ ° 1O O5 O O O SOURCES. TOTAL RATING 705.12(B)(2)(3)(C)] & O O O OVERCURRENT DEVICES, EXCLUDICLUDI NG [NEC ❑ ❑ ° IF BREAKER USED 13 10 �4 CD L0 MAIN SUPPLY OVERCURRENT00 DEVICE. SHALL NOT EXCEED 15 OR 17 O & 16 00 OR PLACARD t�;��' U 0 AMPACITY OF BUSBAR. O IF BREAKER USE _ � OZ O (ONLY IF PV _ Obi °1 t!�Wy II■ LABEL 10 h, LOCATED AT RAPID SHUT DOWN INTERCONNECTION CONSISTS OF LOA 11 0 0 N I' < DISCONNECT SWITCH [NEC 690.56(C)(3)]. SIBREAKER) DE BR) 0�2 L:3 LU LABELING DIAGRAM FOR STRING INV / DC OPTIMIZER INV: i MAIN SERVICE PANEL Z U � U) PHOTOVOLTAIC PLACARD TO BE PLACED AT THE MAIN O 13 EXISTING SUB PANEL WHERE POINT OF PV COMBINER SUBPANEL - INVERTER (S) LU ,� 41 N cu Q1 U) BILLING METER PER XCEL ENERGY. SYSTEM CONNECTED (IF AC DISCONNECT IF USED TO COMBINE � 12 O INTERCONNECTION (IF REQ / INSTALLED) (/) O&O IS MADE) PV OUTPUT CIRCUITS � co > Q LABEL 13 ❑ ❑ IF BREAKER USED O O Q �J t 1 i ; O{ DRAWING BY PLACARD TO BE PLACED AT AC PV AC DISCONNECT DISCONNECT PER XCEL ENERGY ° ° ° B ORO O & O 16 13 O4 e dg J-hun Kim 15 OR 17 ORP PLACARD IF BREAKER USE (:i 1 I JUNCTION BOX V V r OR COMBINER BOX E d o \J Q\y December 27, 2019 LABELING NOTES: 5 PVO 5 O O 1 LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO (ONLY INTERCONNECTIONINTEONLYRCONNNECCTION 10 O PROJECT NUMBER DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND CONSISTS OF LOAE CONSISTS OF LOA 11 �� O 71689656 MAKE APPROPRIATE ADJUSTMENTS- SIDE BREAKER) SIDE BREAKER) O 2 LABELING REQUIREMENTS BASED ON THE 2017 NATIONAL ELECTRIC CODE. OSHA STANDARD 19010.145, ANSI Z535, INTEGRATED DC DISCONNECT SHEET NAME 3 MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. LABELS 4. LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED [NEC *ELECTRICAL DIAGRAMS SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS 110.211 PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON PV5 OF 3 LINE DIAGRAM PV5 LINE DIAGRAM TO REFLECT ACTUAL 5. LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8", WHITE ON RED BACKGROUND: REFLECTIVE. REPRESENTATION OF PROPOSED SCOPE OF WORK, PAGE NUMBER REVISION AND PERMANENTLY AFFIXED [IFC 605.11.1.1] Pvs i o Ertptlase MicroinvertttirU Enphase IQ Tan Microinverters To iearn more about Enphase offerings, visit enphase.corri The high-powered smart grid -ready Enphase IQ 7 t;• krr-- and Enphase IQ i+ Lli,ro— dramaticallyy simplify the installation process while achieving the i?ighest system efficiency. Part of t -e Enprase lQ System, the IQ 7 and IQ 7= Microinverters integrate with the Eno -ase IQ Envoy", Enphase IQ Satterv", aid the Enphase Enlighten' montaring and arralys`s software. IQ Series h.,Izroi- erters e:eie-d :he re'ab iity Standards set fart- by previous generations and undergo over a r--taiio^ hours of power -on testing. enablsng Enphase to provide an mdustry-'leading warranty of up to 25 years. Easy to Install Lightweight and simple Faster instal'ation with 4rnproved, fighter two -Dire cabling Built-in rapid shutdown compliant f NEC 2014 & 2017) Productive and Reliable Cp'S for high pawered 612 -cell and 72-ce`:1% modules More than a million hours of testing Bass 11 double -insulated enclosure UL listed Complies with advanced grid support, vole and frequency fide -through requiremlents lRerriD-vely updates to respond to changing grid requirements Configurable for varying grim profiles Meets CA Rule 21 (UL 1741-S4) 47 he tQ 7+ Micro is recoili 10 support 72-+: eft modules. ",*�w � RAVEN s 1403 N RESEARCH WAY, BUILDING J Enphase IQ 7 and IQ 7+ Microinverters OREM,UT84097 INPUT DATA (DC) IQ7-60-2-US / IQ7-60-B-US IQ7PLUS-72-2-US / IQ7PLUS-72-B-US 800-377-4480 WWW.BLUERAVENSOLAR.COM Commonly used module pairings' 235 W - 350 W + 235 W- 440 W + Module compatibility 60 -cell PV modules only 60 -cell and 72 -cell PV modules CONFIDENTIAL - THE INFORMATION Maximum input DC voltage 48 V 60V HEREIN CONTAINED SHALL NOT BE USED FR THEPeak power tracking voltage 27 V - 37 V 27 V - 45 V ANYONEOXCEPT B UEE OF Operating range 16V -48V 16 V - 60 V SOLAR NOR SHALL IT BE Min/Max start voltage 22 V 148 V 22 V/ 60 V DISCLOSED IN WHOLE OR IN PART Max DC short circuit current (module Isc) 15A 15 A TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN Overvoltage class DC port II ll CONNECTION WITH THE SALE AND DC port backfeed current 0 A 0 A USE OF THE RESPECTIVE PV array configuration 1 x 1 ungrounded array; No additional DC side protection required, EQUIPMENT, WITHOUT THE AC side protection requires max 20A per branch circuit WRITTEN PERMISSION OF BLUE OUTPUT DATA (AC) IQ 7 Microinverter IQ 7+ Microinverter RAVEN SOLAR LLC. Peak output power 250 VA 295 VA n Maximum continuous output power 240 VA 290 VA N�uC E Nominal (L -L) voltage/range' 240V/ 208V/ 240 V f 208V/ E 211-264V 183-229V 211-264V 183-229V CERTIFIED Maximum continuous output current 1.0 A (240 V) 1.15 A (208 V) 1.21 A (240 V) 1.39 A (208 V) Nominal frequency 60 Hz 60 Hz PV INSTALLATION Extended frequency range 47-68 Hz 47 - 68 Hz PROFESSIONAL AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Scott Gurney Maximum units per 20 A (L -L) branch circuit' 16 (240 VAC) 13 (208 VAC) 13 (240 VAC) 11 (208 VAC) # PV -011719-015866 Overvoitage class AC port III M CONTRACTOR: AC port backfeed current 0 A 0 A BRS FIELD OPS Power factor setting 1.0 1.0 385.498.6700 Power factor (adjustable) 0.7 leading ... 0.7 lagging 0.7 leading ... 0.7 lagging 38 EFFICIENCY @240 V @208 V @240 V @208 V Peak CEC efficiency -�� 97.6 % 97.6 975% 97.3z CEC weighted efficiency 9 7. 0 r 97.0 970', 97.0 °o MECHANICAL DATA Ambient temperature range -40°C to +65°C Relative humidity range 4 to 100% (condensing) Connectortype (IQ7-60-2-US & IQ7PLUS-72 2 -US) MC4 (or Amphenol H4 UTX with additional Q -DCC -5 adapter) Connector type (IQ7-60-B-US&IQ7PLUS-72-B-US) Friends PV2 (MC4 intermateable). Adaptors for modules with MC4 or UTX connectors: PV2 to MC4: order ECA -S20 -S22 PV2 to UTX: order ECA -S20 -S25 Dimensions (WxHxD) 212 mm x 175 mm x 30.2 mm (without bracket) Weight 1.08 kg (2.38 lbs) Cooling Natural convection - No fans Approved for wet locations Yes Pollution degree PDB Enclosure Class 11 double -insulated, corrosion resistant polymeric enclosure Environmental category/ UV exposure rating NEM A Type 6 /outdoor FEATURES Communication Power Line Communication (PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envov. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load -break 0 disconnect required by NEC 690. ale Compliance CA Rule 21 (UL 1741 -SA) UL 62109-1, UL1 741r'IEEE1547, FCC Part 15 Class B, ICES -0003 Class B, CAN: product is NO, ted a 01 �a This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC -2014 and NEC -2017 section 690.12 and 022.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer's instructions, �J 1. No enforcedDC,ACral'o.SeelhecoinpatbiIlycalculalotat tt s,r�erpase.cor�en_usZsup 1_riodp -corlp tibihty. 2. Nominal voltage range cen be extended heyond nonlnal if req ut�ed�by the utl'ty. 3 _mils mayvary. Refer to local requlrernents to define the number of rniermrwerlers per branch in your area. SHEET NAME To learn more about Enphase offerings, visit enphase.com I ENPHASE. SPEC SHEET PAGE NUMBER REVISION �ELI Enphase Networking Enphase 10, Combiner 3 U` LISTED To learn more about Enphase offerings, visit enphase.com The Enphase Its Combiner 3" w:th Enphase IQ Envoy- conso'dates 'interconnect on equ pment :nto a s ng e enc''osure and stream 'nes PV and storage nsta at ons by prow d ng a cons stent, pre -w red so ut on 'or res'dent a app *cations. It o"ers up to 'our 2-po e nput c rcu is and Eaton BR sexes bulbar riser-lb':y. Smart Includes lQ Envoy for communication and control Flexible networking supports Wi-Fi, Ethernet, or cellular Optional AC receptacle available for PLC bridge Provides production metering and optional consumption monitoring Simple Reduced size from previous combiner Centered mounting brackets support single stud mounting Supports back and side conduit entry Up to four 2 -pole branch circuits for 240 VAC plug-in breakers (not included) 80 A total PV or storage branch circuits Reliable Durable NRTL-certified NEMAtvpe 3R enclosure Five-year warranty UL listed ENPHASE. Ne_ 'e-LUE RAVEN it Enphase IQ Combiner 3 Ls it �r 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 MODEL NUMBER IQ Combiner 3 X -IQ -AM 1-240-3 IQ Combiner 3 with Enphase IQ Envoy" printed circuit board for integrated revenue grade PV U` LISTED To learn more about Enphase offerings, visit enphase.com The Enphase Its Combiner 3" w:th Enphase IQ Envoy- conso'dates 'interconnect on equ pment :nto a s ng e enc''osure and stream 'nes PV and storage nsta at ons by prow d ng a cons stent, pre -w red so ut on 'or res'dent a app *cations. It o"ers up to 'our 2-po e nput c rcu is and Eaton BR sexes bulbar riser-lb':y. Smart Includes lQ Envoy for communication and control Flexible networking supports Wi-Fi, Ethernet, or cellular Optional AC receptacle available for PLC bridge Provides production metering and optional consumption monitoring Simple Reduced size from previous combiner Centered mounting brackets support single stud mounting Supports back and side conduit entry Up to four 2 -pole branch circuits for 240 VAC plug-in breakers (not included) 80 A total PV or storage branch circuits Reliable Durable NRTL-certified NEMAtvpe 3R enclosure Five-year warranty UL listed ENPHASE. Ne_ 'e-LUE RAVEN it Enphase IQ Combiner 3 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 MODEL NUMBER IQ Combiner 3 X -IQ -AM 1-240-3 IQ Combiner 3 with Enphase IQ Envoy" printed circuit board for integrated revenue grade PV 800-377-4480 Optional, CELLMODEM-01 (3G) or CELLMODEM-03 (4G) or CELLMODEM-M1 (4G based LTE -M) production metering (ANSI C12.20 +/-0.5%) and optional* consumption monitoring (+/-2.5`;0), WWW.BLUERAVENSOLAR.COM ACCESSORIES and REPLACEMENT PARTS (not included, order separately) Compliance, Combiner UL 1741 ....--. .... ... CONFIDENTIAL - THE INFORMATION Enphase Mobile Connect 47 GFR, Part 15, Class B, ICES 003 HEREIN CONTAINED SHALL NOT BE CELLMODEM-03 (4G / 12 -year data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 USED FOR THE BENEFIT OF CELLMODEM-01 (3G / 5 -year data plan) microinverters. (Available in the US, Canada, Mexico, Puerto Rico, and the US Virgin Islands, ANYONE EXCEPT BLUE RAVEN CELLMODEM-M7 (4G based LTE -M / 5 -year data plan) where there is adequate cellular service in the installation area) SOLAR NOR SHALL IT BE Consumption Monitoring* CT DISCLOSED IN WHOLE OR IN PART CT -200 -SPLIT Split core current transformers enable whole home consumption metering (+/- 2 5`.;). TO OTHERS OUTSIDE RECIPIENTS Circuit Breakers Supports Eaton BR210, BR215, BR220, BR230, BR240, BR250, and BR260 circuit breakers. ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND BR10A-2-240 K Circuit breaker, 2 pole, 10A, Eaton BR210 USE THE RESPECTIVE BRK-15A-2-240 Circuit breaker, 2 pole, 15A, Eaton BR215 EQUIPMENT, WITHOUT THE M BRK 20A -2P-240 Circuit breaker, 2 pole, 20A, Eaton BR220 WRITTEN PERMISSION OF BLUE EPLC-01 Power line carrier (communication bridge pair), quantity 2 RAVEN SOLAR LLC. XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3 (required for EPLC-01) XA-ENV-PCBA-3 Replacement IQ Envoy printed circuit board (PCB) for Combiner 3 u Bi ELECTRICAL SPECIFICATIONS - Rating Continuous duty CERTIFIED System voltage 120/240 VAC, 60 Hz PV INSTALLATION Eaton BR series busbar rating 125 A PROFESSIONAL Scott Gurney Max. continuous current rating (output to grid) 65A # PV -011719-015866 Max. fuse/circuit rating (output) 90A CONTRACTOR: Branch circuits (solar and/or storage) Up to four 2 -pole Eaton BR series Distributed Generation (DG) breakers only (not included) BRS FIELD OPS Max. continuous current rating (input from PV) 64A 38 385.498.6700 Max. total branch circuit breaker rating (input) 80.A of distributed generation / 90A with IQ Envoy breaker included Production Metering CT 200 A solid core pre-installed and wired to IQ Envoy MECHANICAL DATA Dimensions (WxHxD) 49.5 x 37.5 x 16,P cm (19 5' x 14 75" x 6.63"). Height is 21.06'(53.5 cm with mounting brackets) Weight 7.5 kg (16.5 lbs) Ambient temperature range -40° C to +46° C (-400 to 115° F) Cooling Natural convection, plus heat shield Enclosure environmental rating Outdoor, NRTL-certified, NEMA type 3R, polycarbonate construction Wire sizes 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors 60 A breaker branch input: 4 to 1/0 AWG copper conductors Main lug combined output: 10 to 2/0 AWG copper conductors Neutral and ground 14 to 1 /0 copper conductors Always follow local code requirements for conductor sizing. Altitude To 2000 meters (6,560 feet) INTERNET CONNECTION OPTIONS Integrated Wi i=i 802.11b/g/n Ethernet Optional, 802.3, Cat5E (or Cat 6) UTP Ethernet cable (not included) Cellular Optional, CELLMODEM-01 (3G) or CELLMODEM-03 (4G) or CELLMODEM-M1 (4G based LTE -M) __-- — - -----_----(notincluded) COMPLIANCE Compliance, Combiner UL 1741 CAN/CSA C22.2 No. 107.1 47 GFR, Part 15, Class B, ICES 003 Production metering: ANSI C12.20 accuracy class 0.5 (PV production) Compliance IQ Envoy UL 60601-1/CANCSA 22.2 No. 61010-1 * Consumption monitoring is required for Enphase Storage Systems. To learn more about Enphase offerings, visit enphase.com 6 s E. , _.,u �n„�� a;s, ,rl� �� �3��,_:.r� �r E.,�r�,,;�-.we�,fner. ENPHASE. SHEET NAME SPEC SHEET PAGE NUMBER I REVISION SS 0 Safety Resistance to salt mist corrosion at your request Anti -PIC products using advanced module technology Resistance to ammonia corrosion ai your request World 1 st company to ,ass Ti-vesher Test' and On -sue Power Ivteawrement Validation` certificate 9►r SERAPHIM ENERGY GROUP S EG -6M B -XXX B B SERIES 6 INCH 60 CELLS FBB.BLALIt B4Ck.5HEpT IBLAGK Ffte.ME PkOPUCt5 Electrical Char act eristics(STC) Mauomum Powerat STC -P 0N) 295 300 305 310 Open Circuit Voltage -V,r IV) 39.5 387 39.9 402 Short Circuit Current-i�(A) 9-58 9.65 976 982 Maximum Power Votage -V-(V) 31.9 321 32.3 328 Madmum Power Current-I.,,ytA) 9-25 9.35 9.45 954 Module Efficiency STC -q„., 96i 18.13 1844 .... 18.75 19.05 Power Tolerance W. fp.+4.99j Maximum System Vollage iv, 1000 or 1506(UL) Maximum Senes Fuse Rabng,A1 20 Fire Periorman e Type2 or TypellUL) Electrical Char act eristics(NOCT) • ., - ... �-`fxer:;t:�r7.7st:��`3xe3a.*.t:xt.:x;t:��slxcaxaa.ectr7aa.:��scLe a Maxumum Power at NOCT -P,; ilAh 219 2233 226 230 Open Circuit Voltage -V,. IV 1 36.5 367 36.8 37.1 Shod Circuit Current -1 iAj 7.73 7.82 7.91 7.96 Mawmum Power Voltage-V,,N) 301 303 30.4 30.7 Madmum Power Current -Im_r tA) 7.2E 7.36 7.44 750 Performance Temperature Characteristics Pmax Temperature Ccettaent-038'hJ'C •� � Voc Temperature Coet4aent-028'XJ"'C 1s Temperature Coet6aent *0.05 WC Operating Temperahae -40 +85 'C High efficiency and enhanced outstanrbng power output Withstand up to 2400Pa N -i ial Operatslg Cell Temperature (NOCT) 4532'C moduie durability capability at lax irradiance wind and 5400Pa snow loadvIEC)- long lasting srx sr% aa,r� al.zas � '�•. r. m m% -- 9 10 Guarantee on product materialandworkmar itip YEARS ► 01AM :111 & 14 Z 1111 &VAIR119 " ISO 9001: Quality management system ISO 14001: Standard for environmental management system OHSAS 18001: International standard for occupational heath and safety assessment system i � a �• �`_� 11.E-+.��tCc �a C us SE1A�� `I S Linear power output warranty YEARS pw Specitcations are subtest to change wthwl not kation SEG OS-EN1 1'Capyrght 2419 SerephM Packing Configuration Container 20GP 49GP Fieces per Pallet 30 30 Pallets Per Container 12 28 Pieces Per Container 360 840 Machar»cal Specifications Iii 'r992a.35mmFA57x99.06,137- 175 kq•. M 5 Est Mmoa y-tbne. 6-60p- 3 ? nch 16dp-3.? mm AR -.g I -p.. glass. taw ern A,-datlmeium +tby IP67 124VKi...k k ,Ih,,.tW.- - MC4 0-pa6he STC. irradiance 1000 Wim', module temperature 25'C. AM=1 5 NOCT. Irradiance I Wim,. ambient temperature 20'C. wind speed tmh Spedfications are subject to change without funder nolikabon. t If 3 1 2 t Section A -A 101 All Dimensions in mm ` The above drawing a a graphical representation of the product I-V Curve BLUE RAVEN 1403 N RESEARCH WAY BUILDING J OREM UT 84097 800-377-4480 WWW.BLUERAVENSOLAR COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION. EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEFF" C_E_RTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 Speatcalws are subject to change mII notification SEGDS-EN-2019)1.1 r,.;Copyrght 2019 Seraphim • SHEET NAME SPEC SHEET PAGE NUMBER REVISION SS D .rBLUE RAVE SYSTEM BONDING & GROUNDING ` 1403 N RESEARCH WAY BUILDING J ■■ ' m � s' � PAGE OREM.UT84D97 _rs ., , ? 800-377-4480 SFMuouL WWW. BLUE RAVE NSOLAR. Gulvi :.. LUG DETAIL & TORQUE INFO LUG DETAIL & TORQUE INFO gid."gid D E Ai L & "i(0 .° F01 Ilsco Lay -In Lug (GBL-4DBT) ILsco Flange Lug(SGB-4) WileyWEEBLug (6.7) • 10-32 mounting hardware • 1/4" mounting hardware 0 1/4" mounting hardware • Torque = 5 ft -lb 0 Torque= 75 in -lb • Torque =10 ft -lb • AWG 4-14 -Solid or Stranded • AWG 4-14 -Solid or Stranded • AWG 6-14 -Solid orStranded NOTE: ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION System bonding is accomplished through modules. System grounding accomplished by attaching a ground lug to any module at a Location on the module specified by the module manufacturer. E -W BONDING PATH: E -W module to module bonding is accomplished with 2 pre-installed banding pins which engage on the secure side of the MicrorailTM and splice. N -S BONDING PATH. N -S module to module bonding is accomplished with bonding clamp with 2 integral bonding pins. TRIMRAIL BONDING PATH: Trimrail to module bonding is accomplished with bonding clampwith integral bonding pin and bonding T-boLt. CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION. EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. N BCEP� CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 S A0111 11% SHEET NAME SPEC SHEET PAGE NUMBER REVISION SS 0 Intertek Total Quality. Assured. AUTHORIZATION TO MARK This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Party Authorized To Apply Mark. Applicant: Unirac, Inc Manufacturer: Cixi Emeka Aluminum Co. Ltd Photovoltaic Mounting System, Sun Frame Microrail - Installed Using Unirac Installation Guide, Rev Product: No. 688 ChaoSheng Road Address: 1411 Broadway Blvd NE Address: Cixi City Albuquerque, NM 87102 Zhejiang Province 315311 Country: USA Country: China Klaus Nicolaedis Jia Liu Contact: Tom Young Contact: Robin Luo 505-462-2190 +86-15267030962 Phone: 505-843-1418 Phone: +86-13621785753 FAX: NA FAX: NA klaus.nicolaedis@unirac.com jia.liu@cxymj.com Email: toddg@unirac.com Email: Party Authorized To Apply Mark: Same as Manufacturer Report Issuing Office: Lake Forest, CA U.S.A. TUWJJ- Control Number: 5003705 Authorized by: T2�, for Dean Davidson, Certificati fManager US 113reo Intertek This document supersedes all previous Authorizations to Mark for the noted Report Number. This Authorization to Mark is for the exclu&ve use of Intenek's Chent and is provided pursuant to the Certification agreement between Intertek and its Client. httertek's responsibility and liability are firnited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agree mern. for any loss. expense or damage occasioned by the use of this Authorization to Mark.. Only the Client is authorized to pemkt copying or distrbution of this Authorization to Mark and then only in its entirety. Use of Intertek's Certification marts is restricted to the conditions laid out in the agreement and in this Authorization to Mark. Any further use of the Intertek name for the sale or advertisement of the tested material. product or service must first be approved in writing by Intertek. Initial Factory Assessments and Follow up Services are for the purpose of assuring appropriate usage of the Certification mark in accordance with the agreement, they are not for the purposes of production quality control and do not relieve the Client of their obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 ATM for Report 102393982LAX-002 Page 1 of 1 ATM Issued: 9 -Apr -2019 ED 16.3.15120 -AW -17i Mandatory t. 1403 N RESEARCH WAY BUILDING J OREM UT 84097 800-377-4480 WWW.BLUERAVENSOLAR COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 0� SHEET NAME SPEC SHEET PAGE NUMBER REVISION SS 0 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat - Standard(s): Plate Photovoltaic Modules and Panels [UL 2703: 2015 Ed -111 Photovoltaic Mounting System, Sun Frame Microrail - Installed Using Unirac Installation Guide, Rev Product: PUB2019MAR01 with Annex North Row Extension Installation Guide Rev PUB2019FEB20 Brand Name: Unirac Models: Unirac SFM ATM for Report 102393982LAX-002 Page 1 of 1 ATM Issued: 9 -Apr -2019 ED 16.3.15120 -AW -17i Mandatory t. 1403 N RESEARCH WAY BUILDING J OREM UT 84097 800-377-4480 WWW.BLUERAVENSOLAR COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 0� SHEET NAME SPEC SHEET PAGE NUMBER REVISION SS 0 BLUE RAVEN FLASHING & SLIDERS 1403 N RESEARCH WAY BUILDING J r P 0R EM. UT 84097 800-377-4480 PAGE WWW.BLUERAVENSOLAR COM — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — L-- - --- - - PILOT HOLES: Drill pilot holes for Lag screws or structural screws (as necessary) at marked attachement points FLASHINGS: Place flashings INSTALL SLIDERS AND TRIMRAIL ROOF ATTACHMENTS: • I n se rt flas h i ngs per manufacturer instructions L;�e Lag screw or structural favierter with, zi nnamrnofyi diameter of 5,116" • Attach sliders to rafters • Verify proper row to row spaci ng for module size (Mod NS + 1') • Ensure that TrimraiLTM roof attachments in each row have sufficient engagement with slider dovetaiLs for proper attachment. INSTALL SLIDERS AND ROOF ATTACHMENTS: Follow manufacturer instructions forflashing installation procedures e drg� s h, ro nLv— th it try� point s h�, I n Q v N as 0 CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR �NPART TO OTHERS OUTSIDE RECIPIENTS ENTS ORGANIZATION. EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT. WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NCEP� 'I CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385,498.6700 Mod NS + 1n® k, at e 4X0 DOWN-SLJOPE ---1 SHEET NAME SPEC SHEET PAGE NUMBER REVISION SS 0 City of Wheat Ridge Resid. Windows/Doors PERMIT - 201902718 PERMIT NO: 201902718 ISSUED: 12/30/2019 JOB ADDRESS: 4325 Everett St EXPIRES: 12/29/2020 JOB DESCRIPTION: Replacing 7 windows like for like throughout home, U -value is .30 *** CONTACTS *** OWNER k'318)426-0239 BECK SAMUEL P *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 21,549.00 FEES Window Replacement 50.00 Total Valuation 0.00 Use Tax 452.53 ** TOTAL ** 502.53 *** COMMENTS *** *** CONDITIONS *** Windows shall comply with all applicable codes, have a .32 or better U -factor and shall be safety glazing if within a tub enclosure, less than 18 inches above the floor or within 24 inches of a vertical edge of a door. I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this ermit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed and that all work to be er0ed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date I . This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and maybe subject to a fee equal to one-half of the original penmt fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6 The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. �i-.XofWheat Ridge 12/30/2019 14t22 C88B Replacing ? windows CU8022277 AMOUNT BHP 4325 Evenett St 502.53 hPPL/P[RHlT NO/ 201902718 PAYMENT RECEIVED AMOUNT PP / 8204 502,53 AUTH CODE: 68924599 TOTAL 582.53 F From: no-reply@ci.wheatridge.co.us Sent: Monday, December 30, 2019 2:05 PM To: CommDev Permits Subject: Online Form Submittal: Residential Window/Door Replacement Permit Application Categories: Dina Residential Window/Door Replacement Permit Application This application is exclusively for RESIDENTIAL REPLACEMENT WINDOWS and DOORS - LIKE FOR LIKE ONLY. YOU MUST ATTACH A VALID CREDIT CARD AUTHORIZATION FORM AND WINDOW/DOOR CUTSHEET (SPEC SHEET) IN ORDER FOR THE PERMIT TO BE PROCESSED. Your Permit will be emailed to the email address provided below once it is processed. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN WORK UNTIL PERMIT HAS BEEN ISSUED. Is this application for Yes replacement window(s) and/or door(s) like for like? PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number (enter WITH dashes, eg 303-123-4567) Property Owner Email Address **REQUIRED** Attach Credit Card Authorization Form - **DO NOT ATTACH RANDOM DOCUMENTS** 4325 Everett St Sam Beck 318-426-0239 spbeck12@yahoo.com Credit Card Authorization Beck 715CWC002K.pdf CONTRACTOR INFORMATION 1 Contractor Business Name Contractor's License Number (This is a 5 or 6 digit number for the City of Wheat Ridge) Contractor Phone Number (enter WITH dashes, eg 303-123-4567) Pella Windows & Doors 020762 720-462-2694 Contractor Email Address jwingo@pellacolorado.com Retype Contractor Email jwingo@pellacolorado.com Address DESCRIPTION OF WORK Number of window Replacing 7 windows like for like and/or doors being replaced Location of Playroom, bedrooms, master bath, office window(s)/door(s) being replaced (for example, master bedroom, kitchen, bathroom, etc): What is the u -value of the Yes .30 window(s)/door(s)? City of Wheat Ridge requires the u -value to be .32 or better on windows.. Attach copy of Beck 715CWC002K- Office Order Copy - 4325 Everett St. window/door cut sheets Wheatridge.pdf showing sizes and u -value Project Value (contract 21549.00 value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work 2 under any permit issued based on this application. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Person Applying for Julie Wingo Permit Email not displaying correctly? View it in your browser. INSPECTION RECORD Occupancs,/T pe INISP F I_ON ONLINE FORM: http://www.ci.wheatridge.co.us/inspection K Q INSPECTION REQUEST LINE: (303) 234-5933 Inspections will not be performed unless this card is posted on the project site. **Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Comments Initials Pier Concrete Encased Ground (CEG) Foundation / P.E. Letter Do Not Pour Concrete Prior To Approval Of The Above Inspections Underground/Slab Inspections Date Inspector Initials Comments Electrical Wall Sheathing Sewer Service Mid -Roof Plumbing Do Not Cover Underground or Below/In-Slab Work Prior To Approval Of The Above Inspections Rough Inspections Date Inspector Initials Comments Wall Sheathing Mid -Roof Lath / Wall Tie Rough Electric' Rough Plumbing/Gas Line Rough Mechanical I Rough Framing Rough Grading Insulation Drywall Screw/ Nail Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing Final Mechanical Roof Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. *For low voltage permits — Please be sure that rough inspections are completed from the Fire District and electrical low voltage by the Building Division. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather City of Wheat Ridge Resid. Windows/Doors PERMIT - 201707778 PERMIT N0: 201707778 ISSUED: 09/28/2017 JOB ADDRESS: 4325 Everett ST EXPIRES: 09/28/2018 JOB DESCRIPTION: Residential window replacement of 7 windows like for like, size for size u -factor .014 and .28. *** CONTACTS *** OWNER 318-426-0239 SAM BEEK SUB (303)371-3750 Graydon Bevis 020762 Pella Windows & Doors Inc. *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: UA / Unassigned BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 24,154.00 FEES Window Replacement 50.00 Total Valuation 0.00 Use Tax 507.23 PAI" ** TOTAL ** 557.23 �'---- -- --- --_ 7 *** COMMENTS *** *** CONDITIONS *** Windows shall comply with all applicable codes, have a .32 or better U -factor and shall be safety glazing if within a tub enclosure, less than 18 inches above the floor or within 24 inches of a vertical edge of a door. I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the le a ner of the roperty and am authorized to obtain this permit and perform the work described and approved in conjunction with this,pe t. I rther att at I am legally authorized to include all entities named within this document as parties to the work to be perfor ed t t ll to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. 19-) 7 Signature oVshalmlelxpire R or CONTRACTOR (Circle one) Date 1. This peued based on the information provided in the permit application and accompanying dans and specifications and is subjectliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This. pe 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issugranting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable c . or any-ordi r re ISti n of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. .-.._----- ____ . Awlx,..'40 -ry City of CWheatPdge MMUNITy DEVELOPMENT Building & Inspection Services Division 7500 W. 29" Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 FOR OFFICE USE ONLY .q/aBl"4 Plan/Permit # l q P � q Plan Review Fee: i- i_ _ Building Permit Application *** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: T3c2J 2Ftlg Property Owner (please print)SR-yy') 'pi-ek Phone:3/L' Property Owner Email: Mailing Address: (if different than property address) Address: State. Zip: Architect/Engineer: Arch itect/E ng 1 neer E-mail: Contractor: Lro n Ci4- S a ,v Contractors City License #: Contractor E-mail Address: _ Sub Contractors: Electrical: W.R. City License # Other City Licensed Sub: City License # X01 Plumbing: W.R. City License # Phone: Phone: S 0 - 2.5_3 Other City Licensed Sub: City License # Mechanical: W.R. City License # Complete all information on BOTH sides of this form Description of work: (Check all that apply) ❑ NEW COMMERCIAL STRUCTURE ❑ ELECTRICAL SERVICE UPGRADE ❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING ❑ COMMERCIAL ADDITION ❑ ESIDENTIAL ROOFING ❑ RESDENTIAL ADDITION ZWINDOW REPLACEMENT ❑ COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT ❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT ❑ ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT ❑ OTHER (Describe) (For ALL projects, please provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be d, etc.) Li 4,- ;C�a e Z i �_--2, ©•z� Sq. FULF Amps Btu's Squares Gallons Other Project Value: (Contract value or the cost of all materials and labor included in the entire project) OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am .the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. CIRCLE ONE: (OWNE (CONTRACTO ) or (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR) 0 SIGNATURE: PRINT NAME: ��� / � ' _I DATE: 1' ZONING COMMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer: PUBLIC WORKS COMMENTS: Reviewer: PROOF OF SUBMISSION FORMS Fire Department ❑ Received ❑ Not Required Water District ❑ Received 0 Not Required DEPARTMENT USE "LY OCCUPANCY CLASSIFICATION: v �z co •vo X S 3 `� N O S m P N W oN c O 2 -i m O co o O w w CC -n w CL Q CD o � O O CD 2 1 O Q N 3 7 SCD O_ fl1 O v 7 Z O m N D =. =3 (0 CD - � O Q O CLO CD. N cn S O Sv 6 a CD CD CD 3 CD (D CD X cnm m 7 � o m Q a CO O G CD W cn �. E5 CD co O O N 111 0 3a cn o CD sv v CD CD 17 Z 0 N U) n N Cl) v W m N O O N CO O W 0 i)1 CD 000C)m„ toil S 0 C 0 O A -0,w -j 00 w �z co •vo X S 3 `� N O S m P N W oN c _v O � o 2 -i m O co o O w w CC -n w 4- WW N < 5�-_ ;aa Qo m n i N 0 3 3 a) rr p � O O O 0 - O Q 3 7 SCD Q fl1 N C � O O O 0 O a fll fl1 o a a o CD sD m 3 O Co W CD � sv a a a c1, n s — _3 77 O 0 3 3 S O CD S33 Om CD 77 � CD N _ =3CD Q. O to ai O a QCD Sn cn Ci — CSD O t0 C2 �o O CD 3 -n 'n :3 O v� O S a N O m O i D =. =3 (0 CD - � O Q O CLO CD. N cn S O Sv 6 a CD CD CD 3 CD (D CD X cnm m 7 � o m Q a CO O G CD W cn �. E5 CD co O O N 111 0 3a cn o CD sv v CD CD 17 Z 0 N U) n N Cl) v W m N O O N CO O W 0 i)1 CD 000C)m„ toil S 0 C 0 O A -0,w -j 00 w n A d 3 m m to S, -0 S CD xx 0 a N CD o� ON o co ccoo co CTI00 W N o 0 00 3coo coo co M •vo X S 3 `� N O S m P N W oN c O a w 2 -i m O co o O w w CC -n w 4- WW N < 5�-_ C/) 3 W 0 n i N 0 3 3 a) rr p O cn 00 4� Q r- 0 O = N sD Co W CD � m c1, — CD o Z C CD N W e. (D S 7 7c' Di `.'-'-. Z] S C? f D -n m v� a m D Z3 n w Cf)O Q N O Z oo oo -1 CD oD w Ul CD N w N W CO w � W O� O W cn O to Cl to 0 flt O B CD O_ O M N CD N O CD CL = a .03•F CD_3 ^� 3 cD v C1 = N OF y CCD `G fA H CCD * Q- o' v m v) � = � m tc 0 -co� �C) cn ID�� ID o 3 Z D] (D fA � 0 O = N m O w — 3 CD 7 p N nsup co D N v z -0 o cn `� cQ m o .-r at o 0a w a C CD CD CD o CD CD p 0 (n N _ O O r cn Q O O Cp < v o� D cn O N O 0 CD 3 CD iU O cn - = 0 y C) S O. d y X X 0 O 3 0 O 7 O C K CD .. m m r o v o t3 M o <. 3 p 4tm N = � .. CD v o U m N co ` -4 ` m CD Q- fD N O v O N N N N CD 0) o 0 o Cp CL Cp N •• O O V N 0 A A O CL n W M - zM c 3 CD CD � � Z W 0 N n O cn � N v W v � 3 0 O cnw Cfl N N O O OD M e o / \CL .�3. 0 S / o \ e ƒ CO \0 C ` < 2 ~ /.. 2 E Wr ° n -n -n � r CD ; 0 k § 2 k G 0 k \ f 7%\/ c) o / M. m G \ $ z / 77C�Po$\ O Orl / 3 = \ a 2L 0 00 % \ \ / ƒ \ `= \ 2 \ @ _ CD_ , o « \ 0 ID 'D }2ƒƒ/EEX CD ƒ =3 ID E-_� -0-0 -&; &°-aRccw0 ƒ{§}!Rm)� -P- 2 = .- 2e-z2A®§m»--�° �2 CD to ,=aEann - - E = o$[EE $q� CLE JE/moo& ° J. y \ 7&a=zo/°z7 CD §$$ Eƒ ) / / G2§�2E8�°° �� ■�� SEE _ % g & a[ef/q ƒe� \){ §z\}-5 $=- x= ' / 0 CD- \ M.. -0 %2}(ƒ/ =\j k . 3 \ 2t% Im §(gk%z ƒ` [w k » 0 O \ \� \ SID 3 0- 0 o= 0 < �a �I00 [ \} k\ w kco \\(� o ���� ` % z 2 G % 2292 M 00 e _ : CD (D }¥ $ E 0 � \ = a o = m R ( 21 \ 0)-n / ° x \ mm E- CD} % m - 2ƒ¢j $ /CA } M -U _ @ \ x _ \\§ , $ \ ?Q 9 3 / \ s / \ / $ « 7 ■ / \ \ � � E � E a m d ƒ 2 k G\ ƒ i CD /_ / o 0 M -1/ �CD 0 CD f o CD /. Q0 \ F = / § ) a / / \ j X a / \ � CDF—W 0) 00 aI \$Tj - ƒ , ° ::z =3 � , _ � ®s=7F\28,(D (n !©§)\ )2 \/\\ za�6§/)=33§ m 2owz°, /��n -- F �22oEp«2$.= 3=g=JE��\\>�$� ��� m /}\\§�/E§}/(�\§\ k\k E 3\' /7 Eta E \k �z�a-tr,- 3 )/�$ i�}ƒ<� ��� - .03 > U) -n {/// //)(%z \ƒ\ & C k 7 = §m- C,;( �Ik k ° �\/� al Ci < J% jkE .e g � \ \ \ :) D - \ C (®/ /ƒ} ¥ \ co 0 fM- a o & m { -u ;a P - \ 21 &32 [// ( ° / o/® ® - \ CD .90 2 c = 2 \ g 2 _ $ )/ƒ2& § x mE< =Eo > S CD (D C / § = Q & \cG �r- \ ■ O § \ 4 3 0 4 0 k V \ W IL.. CD ca - co co N O Mi v CD CD 41 0 M 4325 =O N O. A 35IEI f OC C m L 0 CD 0 O CD (O 3 N 3 a' CD X CD Q m Q O Q) CD C O� v G 0@ r DT -n -n w r CD CO) C) a) 7 w O CD 3 °f 3 A W im_ 3 A (a .ZI 3 CD CD3- D) Q < a m y O CD CD C1 O W O fn — z CD ' (o O CD O O D) O 7 n oCD -i v CSD < N •< m 2. "O .�•. "O_ GJ = c -0 CD m S CD CD Cl) 0 — xcc m�• v N �wc. A W Ui CS 7C p S fV cn CD CT = N �- � w „- x _ • O. C+J ? N 3 az �E 3 W S A o �O � SN Cn� :,=ram 3 = CD z O y `Z O m O N O O Cp (D CD < W Q OC C m L 0 CD 0 O CD (O 3 N 3 a' CD X CD Q m Q O Q) CD C O� v G 0@ cii 3 x Gi ' O v Z A n �_ C _• N C� 3 f11 fll �' C d N W W im_ 3 A " O a fD CQ n N ca O N N W 'p 3 y D - O CD C1 O W CD -S z CD ' (o O CD O O D) O 7 n — fn N < S CD CD Cl) 0 — N CD - 'o _ � O o� oo� (D 3 Zn N M �-o CD -1 o N �� °� p O m 3 3� �! T N D K. x ;U. Q. 3 N O r3O O. C+J ? N 3 az �E 3 W S S. C4 o �O � SN Cn� :,=ram 3 z O y `Z O m O N O O Cp (D CD < W N K Cn II C M Q CD �. l0 y `m 3 C� Z f 7 (D C. �. CL 0 C m (n 3r �- D O� N M. J (D O FD- (D CD C) m TI cn M o w ono O m m D C c �, m < CD =' 3'0 3 a n o 0 �(Q (n N O w O N K O 'O Z7 T N CD 3 W r A p C7 j C ® CD 3 CDCL cn CL nul O (D 0 0 CD G7 L7 O O 2 -I 3 wn = 3 O N 0 m �.ov� r- w CD c ��N 3pC CD 3 Q m N W o v 3 C O v m o p ()1 c to 3 N C 3 N C X N 7 in-. a m W a3 QID N v 3 o C L Ut m r n c 0 3 U) N 3 co CD O 77 c 0 M 0 (D N O CD CD n CO M 3 co CA O W CL m z c 3 zT m cn 0 n M C-0 fo o C) / \£3 f « \ o \ # ® / § 2 w 77 0 } $ ƒ / r-> - m � m k (h S\ R E § CD CD = / \ / - % « « & o a § ■ A B 2 0 7 «_ $ s � cc Q _ \ k . \ O / -0 = Cn _ \ \ \ " $ / / R 10 9 $ \ / e \ y in 0� ' , o in _ $� \ C-)0){2ƒW/QIP/$�{ §k(/7#wJgƒ/k}\22)i 2 2;-zssw6 /2 \ R,F - -y #°�oR«°==a:;nn E,{ 2 - 3 E , E{Eg77/}]%QE�ii IN o� j(cc +' ems ? cn 2 X \\3 /jam k�/ / - G E ■ CD CD0 EE k\{ ƒw- J g - &gga) $�E .XX 3 \ \ i0 ��\mt \/\ \/m ®\f 2 /\ \ x (D a) \4\ ] �`/ / 2 } D \ \ / t \ / ) \ § / i \ \ - / § & iNJ \ƒ 3\r� 0 k \ M co c \D \ { / Co (D ee»o = m 9\ 0 , 72/\ 6 - - -3 CL\\\ \ 3_ k �� / \\ E k 0 0 ) \ cc,D —, x E W )\/ = 2 9 / 2 ƒ \ 2 2 \ � $ a k i■. (n CL0 Oo N O O CD O Q ER 0 m CD rn 0 1625 l � a r > -n •„ T ;u N o M <_ a - m N O yID m o' ,- �v 3 � N (D n x 00 v D CD v cn ch N v_ •• or, x m 3 ti 07)6 i -11O Q � = C ,a N p Z�fn W 2?�� m'Omw �I a Z�? ,nj m: GamN�� a o m ZM0 WS?G)a m yam (D a -- (D 0 y x Ul O v Z a .� ^' O n o m 3 x A N Z y (D (D ° O° (D ? f D N �' �. M ID7? y N° D N Q' �. N 7 3 D O° F D N C A 3 Z3�oo3°za_ o .vyyo—zCc':, c _'mcnyp—z3 pp Z°= —yN O 7 -gyp 0 0 0 C r° O" C O 0 3 N a+ O A 3 Q y 0 0 7 N m O 7 'L A °1 ° A a N n — y ° C— O(D ° o fD a°= G) O J lD O° o a — m �' v 0�— ' O `D m o o o fD c. >l N O ID Cn3."a S O 0 N N =N—ryCD a) 0 ND) _ in3.� NCO co om o. p (D o Qm 3 ap.. °o o(D0 Qm` a Opo N a° r_TT °:zt 'yN N N Opo rTTI :: �cn o(Di N 7 N O° ((DD CL rTT .O.>N C7 O y ° 0. 7 O N .0. (D O �. 3 O -N 2.6 O 071 O 3 O N _. o Qa 3 �� Fmy =X(ND°o ° �3 �Ny 3X(Npoo C -Z -0W acn �yy °x(ND �� C Os 7 fi'1 � S J A Z �`� .D'i f7l � S �� Z �`2 �� ��i 7 j N m 3 S Cl) A Z (O �. O G O W • • W ° N (° O 0J • • W ° lD (° �, o < O W • • W o vmo°cDoa D w v>° v vo3 D [o v>°N ° m o° (D(oa D m m>3 Nc. .. =v Qoo nAfA�_ <3C aoo nain0— On<' C�=a mSCL oSo �a(n Cl) mvC �v� v m m Cn my °< m o cn my �v 3 m m (o C) tet n 0 a ° �d p° n 0 fl = my oO° �i n 0 a° n mm(D0 m Q. p aaiNo°a m a p you CDDCD IDL p m m y Z7 n o = n G ° �J 02 n O °� v A n o y C7 a v o o v o m o o con o _2 n N a 0 3 n _y a o' N o _2 y O (Q y N 7 O N ° (O y N O co N O O N N 7 o N N ons ° ® onC ® . °' n3i CD o r ® CD l< 0Wto x (o 3 v C) m o v cn n m N _ 3 v cn C) ° M CD 0 m a' mop m � m 0 mop m o' ° Aoo v CDD 7 .< N C) N (D N O71 0 � N C) W N Om 0 � '< N () Na (D N m 7.9 rn - m CD 3 -n m w m m cn -n �.� m °' T m m (D v °0< 0 3(D m °F< - 3 (D v °F< o - 3 3 a- m (Q 0 K 3 m ri C 3 0� m ° U5 v m m o D G) c m 0 G) c m m o D G) o —(° o N d v v o fl v v m o —o a A d v v -Tj O (D p `� y CD 1l Q N n m O CD N a v N CO (n. 0 C) D n� (n. C) D n� (n N. 0 (7 D 3 0=- 3 0 w 3 (a w 3 p=-0 m w CD o�p ° o m �p o CD o(<pp ° o Z CD p� P �mom m o r r r C) c 0 O 3 O N Cl C 3 W < (D r w CD o CD 9 CD ci W Q CD n A) N CD P FD 7 CD N N X N cr W O 7 O A M v O d! O 3 ri 0 0 U O cn O co m 0 CO v co 00 co rn W Q m Z C: 3 6 m cn 0 cn n rn ro w 0., 1 m CD CD 0o 0 r y m m m O O a y E3 d C n ;IU CD m CCD = =w aw O tri CDID = m 3 CD 3. Z a o v =r cQ m W n o cn =r CD D — o' 0- N w X O N A 3 co 6 N CD � CL D L7ZVU1 W2� ,()� m��m � �a v ? acn W2�G�� ;IZD m Z 9V1�s� ,(ice m jG�T� -n- 0 n - �v moomx�='mZo�=.o�.� p n'Nm�xc�(DmZo-�=�3� 0omN�1x��mZ . 7 cn cD Q cn N cD O Cn cD O. y N N O j cD O. cn N' 3 0 fD co O W P� N O A A M? W A N CD O N 7 N o A m 3? y cD CO O cD - y O N 7 6003 zm� o _m co&q Z6p03 3 ZD�cQ o _� n6) Z60o3 Zm� o .m yfD < O' CD A m Z o CD vii C7 C) 3 N fl, - O (D - Op m Z O cD O cn C) n j N m O (D- A m Z O A O N n C) O N M— C) OAor0=03ccp �cD���� C)CDg0 -0ocOp ��03��� C)o�or0ocop o= pi N SIA to 3 a = N O Q O O. C m J CD Cn 3-o= N 0 0 o p_ c m AI CD Cn 3 a = m O p O O. o w 7,,O- W m —� (� Wm Cr m O a 3 3CL T m o N O D 3 _n m' a � N m CD N n CD Z7 CL a 7 G m„'o p0D(DSo pNta�.o mo o0th cD 0 A�?�o ioLol o0NDID�.o on��? Q_Q Z -0m m Hca �N 3 X(D = O z TID (DD �nc-3p it 3 xm � O Zmal (D �c 3 y to .. X D fD CD m (D a.m C' ID C� -Zm� m o r. o v CLCD Cn - z -U� m CD �.m o-C�D =� Cn-'Z D n O >> W O N (m� O O� m W to O m Q 4 o � 3 CO —(Do i W O 7 (Q n O_ l0 N w O 7 cQ n ID S p W 7 0 („ c m 0 7 O Cl O_ l0 W w 3 Q CL m C_ N O- p m y C Cn N D3j C_ N O- p 3 =U p, c Co CD Dai C_ m �- O m m N nv 0- n = °' =3 d n � n a ? n n = 01 CD v� m o moCL SCD c, va m o mon SCD0 my m o XC4 �7C7o m� c a ° �C7a m� = Q. D' ono m� c = ° v a M. m n d n m m n 3 D7 v, o r 2 o V) 1 O r- _ - o y � 5' m o r- 2 < n r- CJi �c0 03 7 N O CQ N N O m N N O cD N N 3 m w N y CD O' r- C7, =cc 7 CD O' ti, f- (1, .-.(Cs O m � Z on �o ® < o' on �o m ® < o on �o CD CD ® < Cn m= O A <n Cn m= O- W CD �= 3 N n W CD CD G1 m G) G) a 0 0 '” m G) G) o o m G) G) o a o o 0 m n 3 D c v n 3 D c v cn C) 3 D O p 0o mo 0o m i o 0o m nN iD p m m 0 3 m nN m 0 3 0 0 n N CD m °� r m cc -n cD m °� r m m m °� T 0 m n1< 0 3 v nc< 0 3 o�< o_ 3 U) im n CD m 3 �m n m 3-rj o' m M Co D E c m m o D E c � m CD o D = c -n CL A N cc n A N N 0, O CL A N N N X' cD -0 co 'G c -n D co �G C_ T N -0 co �G c_ N (n n n m n m v m. n n (n 0m n v v (n n C) m n Q. Z< v v w 3 Z� w 3 Z< _ w p CD O O O cD O F (D O cD � � r O C N Q CD (D G r 4t fJ 0 0 .0 Iz O A Ic' a A CA cli 0 3 n 0 3 CD U) m 3 CA CD C7 O CD 0 CD cn o' co CD n m 3 8 co 00 m O .i M -0 no co CD r D T -n -n w r- 0) N O O m 3 m 3 ca d•. 3 m m = m as - cl) w 0 3 y — N 0•3• my .. 3 �� -�. m =r mUoX n S jV � 3 � X N w O c� CD (D Q O U� :� -aC2 L'n•DOOv0OC-nW (D OLTC�(D 2�-7T ,OG�TOOCm!? LTC MMM ,n ,0TOO CT1� (D 3 ai a) m W(D 3 (D O CD N N m N a a- =3 = y� 03-•°'Aa�'a':�N �°' 3=•H3� 3 .vma,��3°' W,y0 _•mID� 3.�-�•°'� y�o"ao-3(D 'm c=CD ol v�o o°a3(D (D CD 3Co(D�° asz3mAN o0 3oD mAo3�mnN�N 1�°'y.aN„m��3oo r�'a(nwD -w o-.ocnCD �mo3co, acncN,----aEn•n V m CD (3 m (D Z (D`G = O ID N K _� O m (D O A M CD Z (D `G 3 O CD N m 3 v m CD N M(D Z CD `G_ O CD N' X � � � vyi O n � . � a � o O T ID CL o N � . Z. 0 , 0 �. G�� `R o O r (D '+ � � � N O n 0 � G) -a " 0 3 � fD n• oacoo-oc3�mcnm^'�o—o��co°-oc_3�CD �Q'o_o�co°=oc3��cnm N O p� N 7 n O CD fl- — 0 0" N O N CD: O n 0 3 0 O- — 0 7 0 DTj CD O p N 7 n 0 3 p fl- _ ,�-. O °_ O n O •• N N" r r- 7 j N N 0 0 r N co" r- 3 N N o o O- N c o 3 Z .. n n v ° S 3 y N X� o A 3 Z Z° .. p C7 v o= 3 N X p 3 Z-' n n o ° 7 y X O °<zWno n�w0�° C)°:o�cQvo�ao C7Qw °:o<< Q,,0 C7�mo O< o ff1 y cn — 0 E n O< N N 3° v v fT1 y O< o w A c cfl O o 5 D 0 o c o ET c 5,o D m 3 �� D D cn �N C�7 �� C M N NwCD c(c �° �� C T �� d N -nC�7 CD C T �o - T N O O 7 - (A Q =' 2 N J N CD O O O - CA t17 � N .,, N 0 O fv _ J ° F7 �. W N S N UC1 O F O O_ CJ N 'p..O J° 7C'7 - - wN (Q X p p Cn �- ,1 in- (n A= M x y 0 7- N J N A <n X O 7 a (n ? O- rS+ ja =CJJ cn A 1..�' ID pCJJ `- A =CJJ `Cn w 3� a = w <�o CL (D (D Z w o 3 �a OOH CL =r O O W ?.J w_ �cn7 7000 JQ 7 G JCL a (D .O QZy' O fD Nf1Z y' O G �Zy' PL C7 o f n n D U) o f v n n O J Z o va (°o not mfl. 5' o mn c o D c w m_- :3 o D w m - o cD o N (DZ - M (D < n< z7 0 < N r (D T r 5' W O -n rn r N 0 0 0 =3 c o o Zo (D :3o 0 -(° CD (p Q _ Cn CD d (p CO CD n 3 N n v 3 N n 3 c c n cc CD ca c o - vN a MN G M O- N M O r o o r o r 0 y CL CD G M r w I-0 .i 0 A 17 CQ S K V w in X 00 C7 c 0 3 CD w 3 co CD 0 0 !D 0 CD cn o� 00 (D Sv 00 3 (9 O O Q m z s= 3 cr m v cn n T O co 0 2 G 9 \ 0 C.0 00& / \ g CO ■ m 0ƒ//ƒƒƒ 0 9 9 O f E m a n a n o 0 g 2 2 / _\ 7? E E- m /) w®° a J k a 0 l 3 m_= x G-0 p a o lu E e p\$a§ @ o i 7/ a] S f E R> E n n a ®\ \ ] 2 w ] m CD / \ m m \ 3 3 \ \ 0 9 2 E § \ § g _ 2 � a IA � K3 + CO� � �o 7 w o w In a « �_ w w C4 p / \ $ / / � / N \ -4 o inCY, a m a 610 o m= w CO o o m o c 1o I G m e e w / \ g CO ■ w City of Wheat Ridge Residential Roofing PERMIT - 20f 702977 PERMIT NO: 201702977 ISSUED: 06/30/2017 JOB ADDRESS: 4325 Everett ST EXPIRES: 06/30/2018 JOB DESCRIPTION: Reroof with certainteed northgate class 4 asphalt shingles; 28 squares; house pitch 4/12 *** CONTACTS *** OWNER 248-765-6495 SAM BEEK *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: UA / Unassigned BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 12,376.00 FEES Total Valuation 0.00 Use Tax 259.90 " s? Permit Fee 251.85 rm ** TOTAL ** 511.75 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201702977 PERMIT N0: 201702977 ISSUED: 06/30/2017 JOB ADDRESS: 4325 Everett ST EXPIRES: 06/30/2018 JOB DESCRIPTION: Reroof with certainteed northgate class 4 asphalt shingles; 28 squares; house pitch 4/12 I by m signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with thispermrt. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed and that all worl el erforrY e is disclosed in this document and/or its' accompanying approved plans and specifications. 7 Signature of _ OV NER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in thepermit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This.permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official ® Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Inspection time requests will be accepted by email only. Please email requests to insptimerequestgei.wheatridge.co.us between 7:30 8ADOa+fg ins ection. Please put the address of the inspection in the subject line. VV- Kimberly Cook From: no-reply@ci.wheatridge.co.us Sent: Thursday, June 15, 2017 11:56 PM To: Permits CommDev Subject: Online Form Submittal: Residential Roofing Permit Application Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. Permits are currently being processed within 3-5 business days, subject to change based on volume. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email Address 4325 Everett Dr Geoffery Elson (248) 765-6495 Field not completed. Do you have a signed Yes contract to reroof this property? It will need to be provided at the time of permit pick-up. CONTRACTOR INFORMATION Contractor Name Fortress Roofing Contractor's License 170123 Number (for the City of Wheat Ridge) Contractor Phone 9703136866 Number Contractor Email Address Jake2720@gmail.com (permit pick-up instructions will be sent to this email) Retype Contractor Email Jake2720@gmail.com Address DESCRIPTION OF WORK Are you re -decking the No roof? Description of Roofing CertianTeed Northgate class 4 asphalt shingle Material Select Type of Material: Asphalt If "Other" is selected Field not completed. above, describe here: How many squares of the 28 material selected above? Does any portion of the property include a flat roof? If yes, how many squares on the flat roof? No Field not completed. 2 TOTAL SQUARES of all 28 roofing material for this project Provide additional detail This is a house 4/12 here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract 12,376 value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant Jake Miller Email not displaying correctly? View it in your browser. 3 Kimberly Cook From: William Myers Sent: Tuesday, June 27, 2017 12:27 PM To: Kimberly Cook Cc: Brian Tardif Subject: 8220 40th ave SWO It appears there is a deck being built with out a permit. I placed a stop work order and took pictures. I had permission from a man named Dace to enter the back yard. Bill Myers Plans Examiner/Building Inspector 7500 W. 29th Avenue Wheat Ridge, Colorado 80033 Office Phone: 303-235-2878 Fax: 303-237-8929 www.ci.wheatridge.co.us ( 0N. s)l W heat I is 1 e {'OmmkI."IIy IlltII I '— CONFIDENTIALITY NOTICE: This e-mail contains business -confidential information. It is intended only for the use of the individual or entity named above. If you are not the intended recipient, you are notified that any disclosure, copying, distribution, electronic storage or use of this communication is prohibited. If you received this communication in error, please notify us immediately by e-mail, attaching the original message, and delete the original message from your computer, and any network to which your computer is connected. Thank you. I�I�I FORTRESS ROOFING AUTHORIZATION TO PROCEED Customer Name: t"Y1 Phone Number: 76� 7 f -s Prope Address: 7T132 S 4i V � Y� � City: 1 � " � � State: �' Zip: 8'003� The work that I am agreeing to does not involve m insurance carrier. agr g y I am fully aware that Fortress Roofing Corp. is an independent company working for me/us, not the insurance company or adjusting agency. 40000 Fortress Roofing Corp. and my insurance carrier may meet to discuss the scope of damage. I agree to retain Fortress Roofing Corp. if insurance coverage is extended. You have the right to rescind this contract and obtain a full refund of any deposit within 72 hours after entering the contract. If you pian to use the proceeds of a property and casualty insurance policy to pay for the roofing work, you may rescind this contract within 72 hours after you receive written notice from the property and casualty insurer that your claim has been denied in whole or in part. However, Fortress Roofing Corp. is entitled to retain payments or deposits to compensate Fortress Roofing Corp. for roofing work actually performed in a workmanlike manner consistent with standard roofing industry practices. Fortress Roofing Corp. cannot pay, waive, rebate, or promise to pay, waive, rebate all or part of any insurance deductible applicable to the insurance claim for payment for roofing work on your property. %O� Fortress Roofing Corporation will complete the work for the amount of my insurance carrier's estimate, including any supplemental payments allowed (ie. Permit cost, etc.). I, as homeowner/Property Management company will be responsible for paying the policy deductible. Unforeseen items will be discussed and billed accordingly. If plywood is needed to provide a solid surface prior to installing shingles (building code). Fortress Roofing Corp. will notify homeowner immediately if there are additional layers of roofing or unforeseen damages that need to be addressed. If there is a code item needed that is not covered by my insurance company, I agree to pay for the item out of pocket. Property owner is aware that any siding that is within 2 inches of the existing shingles may need to be trimmed to have new flashing installed. All reasonable care will be taken to minimize any damage to the siding or paint however homeowner is aware that damage may occur and will be at the owners expense for any needed repairs. ✓ Fortress Roofing Corp. shall hold in trust any payment received from you until Fortress Roofing Corp. has delivered roofing materials at the site or has performed a majority of the roofing work on your property. Any unpaid balance will be due upon completion of the work. I acknowledge that any unpaid bills, outstanding for a period of thirty (30) days from the final billing date, may be subject to a Mechanic's Lien, with Fortress Roofing Corp. being entitled to recover all costs of collections, including reasonable attorney fees. All past due balances should be subject to a finance charge of 24% per annum. Regardless of delays in inspection by the associated permitting jurisdiction, payment is due upon completion of the job. Fortress Roofing Corporation carries workers' compensation, automobile and commercial general liability (bodily injury and property damage) insurance. A Certificate of Insurance identifying our insurance carrier and the types and amount of the coverage and our insurance contact information is attached or will be provided to Customer and is incorporated herein by reference and should be considered as part of this contract. have read, understand and agree to the terms of "How to Prepare for a Re -roof Project" Form. Shingle Manufacturer: If YP tZ � T e:1�, 10i ==4e Color: l.e Class #: Drip Edge Color: W 4, f"e... Amount Due at Job Start: Total Contract Price: _ - I , 3 �(, - �� Homeowner Upgrade Costs: _ Insurance Company: - Permitting Jurisdiction: Claim #: 5 Ln x`/12 Agree & Authorized by: ,.-._ .._ Company Representative- �'- Today's Date: ,_ IJ. A, i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Job Address: Ll 3 -4 v f o. e -i-t- Permit Number: b / 7 n -3- 913 (2PRov�,0 f , ❑ No one available for inspection: Time AM/PM Re -Inspection required: Yes No When corrections have been made, call for re -inspection at 303-234-5933 Date: Inspector: DO NOT REMOVE THIS NOTICE ( i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: V Job Address: q3z T Permit Number: -7 o/ 7 ,, -� x'77 ❑ No one available for inspection: Time 1 V)&/PM Re -Inspection required: Yes When corrections have been made, call for re -inspection at 303 -234 - Date:— () C_1//�/_;111 Inspector: /_V� DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division / (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: �1c-t � I")Vess t)yk) I � i - Job Address: 4325 F, VLY�+H SE Permit Number: 'ZU>OZDS U w(i l �� ❑ No one available for inspection: Time LAM/ M Re -Inspection required: Yes No When corrections have been made, call for re -inspection at 303-234-5933 • 1 Date: % Inspect r: DO NOT REMOVE THIS NOTICE i a G, 41 CITY OF WHEAT RIDGE Building Inspection Division j (303) 234-5933 inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: C A S I m Job Address: t' e c- S Permit Number: l -7 0 0 3 G S S m i n1 ❑ No one available for ins ction: Time AM/PM Re -Inspection require Yes N *When corrections hav ,call for re-inspe on at 303-234-5933 Date: y �- Inspector: l DO NOT REMOVE THIS NOTICE Building & Inspection Services Division 7500 W. 29`h Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 ' Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: perm its(a)ci.wheatridae.co.us 1 FOR OFFICE USE ONLY Date: Plan/Permit # �l 7 gg j 2_() T Plan Review Fee: Building Permit Application Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. Property Address: Property Owner Email: Mailing Address;. (if different than property address) Address: State ArchitectfEngineec Architect/Engineer E-mail: Contractors City,Ucense #: Sub Contractors: Electrical: W.R. City License # Other City Licensed Sub: City License # Plumbing: W. R. City License # 0 Phone - Phone? , ./4 1 Other City Licensed Sub: City License # Mechanical: W.R. City License # Complete all information on BOTH sides of this form ❑ COMMERCIAL ❑ RESIDENTIAL Description of work: (Check all that apply) NEW COMMERCIAL STRUCTURE ❑ ELECTRICAL SERVICE UPGRADE NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING COMMERCIAL ADDITION ❑ RESIDENTIAL ROOFING RESDENTIAL ADDITION ❑ WINDOW REPLACEMENT COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT OTHER (Describe) proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc.) f J q. !LF Btu's S Amps Squares Gallons Other Project Value: (Contract value or the cost of all materials and labor included in the entire project) OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances. rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record: that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application: that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. 1, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLE ONE; (OWNER, ¢CONTRACTOR) or (first and In! ATIVE) of (OWNER) (CONTRACTOR)- 7) DAT)L Building Division Valuation AIN, i. DnendA 4 oz) 0 I i �G,IMI�i'�IIIIII II IIIII�I Ill I11 �,lill�l I I it I I Harrison Milts Front Mission Hill Iron Front 31-SDSHMOS (hallow) 31SDSHMBD (Deep).. 31-MHIFSSDOS (Shallow) 31-MHIFSSDBD (Deep) Input Rating Natural Gas 21,000-33,000 BTU/HR 6.1-9.6 KW/HR Propane 21,000.33,000 BTU/HR 6.1-9.6 KW/HR Efficiencies Steady State$2% P4 < 12% Standard Features< Electronic Ignition Spark -to -pilot ignition with battery backup and continuous pilot switch for standing pilot applications N Remote Control Multi -function remote control system c/w smart thermostat Convection Fan High efficiency direct drive blower, 6 speed levels controllable from remote . ` Ceramic Glass Included Viewing Area 26"W x 16-3/4" H - 31" diagonal � a Vent Size Dual 3" (76mm) co -linear vents exit tap of unit Burner Type Wall to Wall steel pan firebox Construction Welded, rivet and gasket, silicone free c Warranty Limited lifetime � � = Minimum Host Fireplace Opening** "Controls out": Controls mounted in forward 30" W x 20-1/4" H x 14" D position for deep surround and surround doors "Controls in": Controls mounted for shallow 33-1/2"W x 20.1/4" H x 15.1/2" D- surround or inside fit Clearance to Combustibles Mantle Clearance 35" from bottom of unit to bottom of 8" mantle DVIM33C Surround Side Clearance 1" {does not apply to inside fit surround) Tested and Approved to Canadian and American Standards ANSI T21.88-2009/CSA 2.33-2009 To: Page 2 of 4 2016-08-01 19:04:36 (GMT) 13034240466 From: Jesse Lanyon City o jqr W h6at R%,,jge coOm mi UNny DvVFL(,,)pMENT 'Building Permit Applicatiorl a ... i Y R `. R R' :i R w. R " R R� a t ♦... t p :�. R R Y'. ., .: i R.: Address., . wl x. C.c�trtr'%a� � �,1n� �., Pati,• � �� °° �' Electrical. 2 L, .tx; �� Plc robing; cla m .. R, City License WA, City L nse # W,R, City License #t Other City Licensed n ubt Coder City LIicens t sub: City License ns # City License 4 Complete all information To: Page 3 of 4 2018-08-01 19:04:38 (GMT) 13034240495 From: Jesse Lanyon N I EW COMMERCIAL STRUCTURE ELECTRICAL SERVICE UPGRADE NEW # ROOFING COMMERCIAL ADDITION RESIDENTIAL ROOFING, RESUeNTIAL ADDITION t COMMERCIAL ACCESSORY,STRUCTURE (Garage,,shed, deck, etc'.) RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, atc) ME6ANICAL s r . a w « +. or REPLACEMENT PLUMBING n d !'}k. d REPAIR le♦cw REPLACMENT ELECTRICAL SYSTEMIAPPLIANCE I REPAIR or REPLACEMENT (Contraid value or the cost of Al_ rtI materialsa�ndlabor inciuded in the _entire project) l,berelry corkt, that the setback distaric s proposed by this permit application arc accurate and do'not violate applicxahle aardiaaaiwes, hales or regulations of the City of Wheat Ridge car covenants. crocrat or restrictions f r c rd; that t rr fu ray tats Shown, "d lie�ations ma(, ars: aevu ate; that l have sed anrt a � to, abide, by all ec neftio s tar rare this Applicati0a atm that 1 assume full responsibility for oomplitak with appheAhlc City Of WhZ41 Ritige Co &,$ a0d 0gJiu,saaca .tier -MOOl r under anyperrah issued leased on this ppli iota. thaat 1 an) the legal tsavater° ar havc beta authorized by the legal aown r of the property to perforru the desmbed work and atrt also authorized by thele ale weer of ally entity iraclt &A on this application to list flair entity on this application, 1, the applicant, for this boil(inig permit application, Warrant the ttvt ilulne s ofiire inforrraationlrovid cf on the a plicalicm- 11 1 E' 4,O)V�4'ER) f fl; i#I it°it7 as ( THORIV t o° Xl d o fCtt31� " � fC"o."t°?` ACS .f El 1, understand th at *!,chin this b a:, t6 t T ack* ledge that this. trrttlitutes a legal si aantre. 1** � A City of Wheat Ridge Residential Roofing PERMIT - 201400990 PERMIT NO: 201400990 ISSUED: 07/1,7/2014 JOB ADDRESS: 4325 Everett ST EXPIRES: 07/17/2015 JOB DESCRIPTION: Re-roof using Armor Shield asphalt shingles 44 squares; 4/12 pitched roof CONTACTS *** .... ... ... ... OWNER PHILLIP DISPENSE SUB (303)548-5000 Alan Parkes 021001 Roof Corp. PARCEL INFO ZONE CODE: UA unassigned USE: SUBDIVISION CODE: UA 1 Unassigned BLOCK/LOT#: 0 FEE SUMMARY ESTIMATED PROJECT VALUATION: 1.4, 900.00 FEES Total Valuation 0.80 Permit Fee 283.55 Use Tax 268.20 e. ** TOTAL 551.15 *** COMMENTS *** A City of Wheat Ridge 'A Residential Roofing PERMIT - 201400990 PERMIT NO: 201,400990 ISSUED: 07/17/2014 JOB ADDRESS: 4325 Everett ST EXPIRES: 07/17/2015 JOB DESCRIPTION: Re- using Armor Shield asphalt shingles 44 squares; 4/12 pitched roof na e er b, a b or" 5' d specifications, p e O'ic h ave been authorized p in njunction with 'he ep 0 ' wo rk c I e munie al co '0 " a t t est ' da applic P dia I rze to but In P c Id n 11 h .0 en an n at t I o t hi s doc irt this co I k t si C C ]to rn bi a "e a bpNptli _ l egal owue t pr o pe n y tj It I u 11 at test t t m 3, or inc a Wor o be pej�j p rm . f rt er a ' ha I a e a aut d 0 i 01 U that all work to P r Orru 'd , discl ,e pecifications, rned a d be e t s�d s , I d n Signature of OWNER or CONTRACTOR (Circle one) Date Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 3PX ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. r � •' r- ♦- - rt r• Ar r r r •' Call by Inspection • • r business da � "" ! • ,s •r r- rr e Lath f Wall tie Mid -Root Electrical SerA Rough Electric Rough Plumbing Gas Pipin Rough Mechanica As ovE wspEcTto To BE smED PRm ro PRc Framing City o f Wheat i Insulation 87/17/291 11T �.o Drywall Screw Re-roof usiny Armor , D8�t1 FINALS VISA e p r � et t A S 551. 7 �1� � � K ;} 8 Electrical Plumbing PAYMENT iii EI . U T Mechanical M / 871 9 551. III" E: �� �: Root O 551. Building Final -------- I -- --, - -- -- -1 ---------- Fire Department R. ©.W & Drainage I NSPEC'nONS FOR PLANNING & ZONING, FIRE AND PUBLIC WORKSISHOULD Par lna & LandscaOinq BE CALLED AT LEAST M E INEEK PAM TO FINAL INSPEC . ''rs • rt s °• r w s { rt rt. 4"CCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF OCCUPANCY IS ISSUEs PROTECT THIS CARD FROM THE WEATHER I t I um IM NO &A 1#149MUL14 ounDwo PVPARTNDO COMMUTs; (=UPANCY FM MpART#AEMr-, 0 oppro"d w/ conu"wft 13 disappM"d 0 s* ivvitw f"uftd # Lonna( I Lzmw 4v CITY OF WHEAT RIDGE Building Ins !on Division InspectionType: s • ds Permit Number: 2c1q06ZT1 I CITY OF WHEA Buil ding In . . • a � Inspection Type: S6 s • Ad dress: P.. AM /P 0 No one availably: for inspect Time Inspection Type: S6 s • Ad dress: P.. I Complete all information on BOTH skies of this form Sq. Ft./LF Stu's Gallons Amps --f]LL- Squares Other OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this pemit application are accurate and do not violate applicable ordinances, rules or re Yulations of the Cit of Wbe Wi e i WilM Building Division Valuation- City of Wheat Ridge Building Division 7500 W 29 Ave., Wheat Ridge, CO 80033 Office 303-235-2855 0 Inspection Line: 303-234-5933 ! ! • ! „ ' 91 ! Property Owner (please print }: Mailing Address: a Plan Pe it ! *049 "t' Electrical City License #t: Plumbing City License Mechanical City License Company: Company Company: �� in Data. t `1 """''''''''!~,IIIW,UlJ.!I\",,., "",..,c,,,,,,%',,,,', '",' "J""~"J""""",,,,,,,,,,,,,~,,,,,,,,y,.,,,~,!,,,,,,,,,,,,, ",,,,~i,,",,,,,,,,,,,,,,,,, """'", ''"' ""''''''''~'''P""",!,JI,,,,,,. 'f"""""" "",I, ; ~ llf4l' (1 Ii !P~w. City of Wheat Ridge Residential Roofmg PERMIT - 070911 PERMIT NO: JOB ADDRESS, DESCRIPTION, 070911 4325 EVERETT ST install shake shingles on ISSUED, EXPIRES, patio roof 08/28/2007 02/24/2008 - .** CONTACTS .*. owner 303/431-6526 Phil Dispense Craig - 3/345-5564 ** PARCEL INFO ZONE CODE: SUBDIVISION: ** UA 0234 USE, BLOCK/LOT#: UA 0/ ESTIMATED PROJECT VALUATION, FEES 30.55 .00 8.10 38.65 450.00 ** FEE SUMMARY .* P"rmit Fee Total Valuation Ufle Tax *~r TOTAL ** - Comments: Subject to field inspection I ~lereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regUlations of the City of Wheat Ridge or covenants, easements or res'trictions of record; that all lne.:lElUreU'lents S WIl', and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application dthat ssume full responsibility for compliance with the Wheat Ridge Building COde (I.B.C) and all other applicab eat R Ordinances; for work under this permit. Plane subject to field inspection. SiSJnat~e of contractor/owner date 1. This permit was issued in accordance with the provisions set forth in your application and is subject to the laws of the State of Colorado and to the zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable ordinances of the City. 2. This permit shall expire lS0 days from the issue date. Requests for an extension must be received prior to expiration date. An extension may be granted at the discretion of the Building Official. 3. It 'this-permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have heener will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (l}year. It changes have been or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit. 4. No work of any manni!r shall be done that will change the natural flow of water caWling a drainage problem. 5. Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written aPProval on inspection card before proceeding with successive phases of the job. 6. The ise:uance of a permit or the oval of drawings and specifications shall not be construed to be a permit for, nor an approval of, any viol i 0 e proVisions of the building codes or any other ordinance, law, rule or regulation. All plan review is subj eld inspections. Sigltatureof Chief Buildi date INIIPBCTION RBQUBS'r LINB. (303) 2H-5933 BUILDING OFFICE, (303) 235-2855 REQUESTS MUST BE MADE BY 3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. ~~' .HE4/, 1'/ ~ " - ~ u ~ 05tOR!>.'1:P COMMUNITY DEVELOPMENT.DEPARTMENT BUILDING INSPECTION LINE - 303-234-5933 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80033 - (303-235-2855) MINOR APPLICATION V,or e '" jC ~ V" ,rr-' r.... Ac/< Building Permit Number: Date: I PLAN # Property Owner: P A : J Property Address: l( 3, ;). S Contractor License No.: Company: /,0..., <. Phone: 2> D 3- :J L/ r, S'..r 0; V c..) t.J...... </" Phone: OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I Buildinq Dept. Valuation Figure: $ I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and aUegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that 1 assume full responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for work under this permit. Plans subject to field inspection. Value:$4~.oo Permit Fee:$ Plan Review Fee:$ Use Tax:$ Total:$ (OWNER}(CONTRACTOR): SIGNED DATE (OWNER)(CONTRACTOR):PRINTED DATE Use of Space (description): Description of work: Sq. Ft. added BillLDING DEPARTMENT USE ONL Y SIC: Sq,Ft.: rLONING COMMENTS: Approval: Zoning: BUILDING COMMENTS: Approval: PUBLIC WORKS COMMENTS: Approval: IRE DEPARTMENT COMMENTS: Approval: Occupancy: Walls: Roof: Stories: Residential Units: Electrical License No: Company: Plumbing License No: Company: Mechanical License No: Company: Expiration Date: Approval: Expiration Date: Approval: Expiration Date: Approval: (1) This permit was-issued in accordance with the provisions set forth in your application and is subject to the laws of the State of Colorado and to the Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable ordinances of the City. (2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building authorized is suspended or abandoned for a period of 180 days. (3) If this permit expires, a new pennit may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a newpermiL (4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem. (5) Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card before proceeding with successive phases of the job. (6) The issuance of a permit or the approval of drawings and specifications shall not be construed to be a pennit for,noran approval of, any violation of the provisions of the building codes or any other ordinance, law, rule or regulation. All plan review is subject to field inspections. Chief Building Official