Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
11810 W. 39th Place
INSPECTION RECORD �//Z_ Inspection online form: http://www.ci.wheatridge.co.us/inspection Cancellations must be submitted via the online form before 8 a.m. the day of the inspection Inspections will not be performed unless this card is posted on the project site Request an inspection before MIDNIGHT (11:59 PM) to receive ct an in ' n the following business dlav,, PERMIT , /9V/0"�dADDRESS: �� ��� ��� JOB C DE: Foundation Inspections Date Inspector Initials Comments vl K 102 Caissons / Piers l 103 Footing / P.E. Letter 104 Foundation Setback Cert. 105 Stem Walls 106 Foundation wall Insulation Do Not Pour Concrete Prior To Approval Of The Above Inspections Underground / Slab Inspections Date Inspector Initials Comments 201 Electrical / Cable/ Conduit 202 Sewer Underground Int. 203 Sewer Underground Ext. 204 Plumbing Underground Int. 205 Plumbing Underground Ext. 206 Water Underground Do Not Cover Underground or Below / In -Slab Work Prior To Approval Of The Above Inspections Rough Inspection Date Inspector Initials Comments 301 Rough Framing 302 Wall Sheathing 303 Roof Sheathing 304 Sheer Inspection 305 Insulation 306 Mid -Roof 307 Metal / Lath / Stucco 308 Rough Electrical Residential 309 Rough Electrical Commercial 310 Electrical Meter Residential 311 Electrical Meter Commercial 312 Temp. Const. Meter 313 Rough Plumbing Residential 314 Rough Plumbing Commercial 315 Shower Pan SEE OVER FOR ADDITIONAL INSPECTIONS PERMIT, � C ADDRESS: - � � � JOB Xr- I� CODE: leXZ Rough Inspection (continued) Date Inspector Initials Comments 316 Rough Mechanical Residential 317 Rough Mechanical Commercial 318 Boiler / Furnace 319 Hot water tank 320 Drywall screw and Nail 321 Moisture board / shower walls 322 Rough Grading 323 Miscellaneous Final Inspections Date Inspector Initials Comments 401 Gasline 402 Gas Meter Release 403 Final Electrical Residential 404 Final Electrical Commercial 405 Final Mechanical Residential 406 Final Mechanical Commercial 407 Final Plumbing Residential 408 Final Plumbing Commercial 409 Final Roof n ,( 410 Final Window/Door 411 Landscape/Park/Planning* Inspections from these entities shall be requested one week in advance. *For landscaping and parking inspections please call 303-235-2846 "For ROW and drainage inspections please call 303-235-2861 'For fire inspections please contact the Fire Protection District for your project. 412 Row/Drainage/Public Works** 413 Flood plain Inspection** 414 Fire Insp. / Fire Protection*** 415 Public Works Final** 416 Storm Water Mgmt.** 417 Zoning Final Inspection* 418 Building Final Inspection Note: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not constitute authorization of occupancy. For Low Voltage permits please be sure that rough inspections are completed by the Fire District and Electrical low voltage by the Building Division. The City of Wheat Ridge Third Party Form Check List Property Address lie to '-"j -3,74, Permit Number _20 19 0 t 0 so Permit Issued Date.-Q,Y -- tl - ZoIR Owner Information Property Owner Information Property Owner Address Inspector Information Inspection Company P(_ -Y , LL c - Inspector Name Inspector Contact info. Inspector Statement d Acknowledqement I hearby acknowledge the roof I am inspecting is 6/12 or over all roofs that are under 6/12 must be inspected by the City of Wheat Ridge Buiding Dept. * I hearby acknowledge the roofing system for the referenced building has been inspected and found to be in compliance with the minimum requirements of the 2012 IRC and 2012 IBC as well as all city hea idge Policies and Procedure and Manufacturers recommendation d e ons. Inspector: Date: as ffOwnerStatement of Ackrinwh-rii-am _nt 'I hearby acknowledge that I am the owner of the building referenced above and I give my consent for the listed third -party inspection company to perform my roof inspection in lieu of the City of Wheat Ridge B ivision inspection. Propery Owner/ Agent: a?r Date: This original document as well as the roofing check list, must be submitted to the Chief Building Offical within seven days of the final inspection. Drop off in person Submit via Email Permit counter 2nd floor Kgook Caci.wheatkg_,co.us 7500 W. 29th Ave Wheat Ridge CO 80033 Drafted Date: 7/26/17 Please add note to reverse side The City of Wheat Ridge Inspection Check List notes Final Roof Roof lnspP(,-tion rl/n P) Fail IJ Pass ❑ Fail Structural roof components N/A 11 [IV Pass [J Fail Verify that no more than 2 layers of shingles exist N/A NIT Pass s 1- -1 Fail Flashing for roof and walls J Fail if new sheathing is installed verify that it is listed in the permit description (Valuation must be adjusted) IWN/A I 1❑ -J, Pass [] Fail Verify sheahing nail pattern ( See policy & Proceed ures) 1-11 Pass r__ Fail Crickets and saddles where needed Pass Fail Verify B vent must have boot same gauge as pipe N/A Pass Fail Verify vent caps Cl M/A i� Pass Fail Verify no flashings are damaged or rListed N/A Fail Step flashing shall be min. of 44 piece per shingle Pa:; Fail Verify scuppers allow for proper drainage Pass Fail Ice and water shield 2' in heated wall spaces P"' D Fail Underlayments must follow 2012 IRC / 2012 IRC xl_� PEI Fail Verify roof slope for proper drainage I\i /A IG J Pass Fail Dripedge shall have min of 2" overlap I/A Pass Fail Dripedge should extend down min 2" past roof deck N/A Pa-, I Fail Dripedge shall be mechanicaly fastened 12" OC Fail 90 LB roll roofing shall not be applied to roof slopes less than 2-12 slope: Exception, detached garages, patios, carports, open on three sides with min. slope of 1-12 JVN,A Ll rl'ls_" [-I Fail Modified Bitumen, EPDM, TPO min slope 1/4:12 slor)e N /A❑ r-] Fail Above roof insulation R-25 11I'N!/A I PaS,, [] Fail Below roof residential R-38 Nin. Cl Piss F-1 Fail Below roof commercial R-32 �1;ni 1 1 N/A Pass -1 F, I Modified Bitumen, EPDM, TPO min slope 1/4-:12 slope must be installed in accordance with the manufacturers specifications- Must have manufactures letter of warranty with the address on the letter for final inspection Me�tal Roof Shinalos Requirements N /A -1 PT -1 I— J F,il Metal roof shingles shall not be installed on slope less 312 -1 Pd" F'o Metal valley flashing shall be the same material as roof I - r aii Metal valley flashing shall extend a min of 8" from the centerline with a min. of 3/4 " high splash diverter rib built-in at the flow line with sections overlapping -.1 a min. of 4" Tile Roofs Re-quirements I -I 1 -ail Clay and concrete the shall have a min. 2-112 12 slope Slopes 4:12 and under require double underlayment The City of Wheat Ridge Inspection Check List notes Final Roof Notes Company Name: Inspector signature: Date of Inspection: _ i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 30(0 Job Address: I J O W Permit Number: zo l -Z Q I Q SC � mq�) wa glA - ❑ No one available for inspection: Time , G gPM Re -Inspection required: Yes V When corrections have been made, call for re -inspection at 303-234-5933 DaS 01 11W Inspector: / DO NOT REMOVE THIS NOTICE I City of Wheat Ridge Residential Roofing PERMIT - 201801080 PERMIT NO: 201801080 ISSUED: 04/17/2018 JOB ADDRESS: 11810 W 39th PL EXPIRES: 04/17/2019 JOB DESCRIPTION: Reroof remove and install Malarkey Legacy 50 IR4 Asphalt Shingles with 45 squares. Pitch 6/12, 3rd Party Inspection required. *** CONTACTS *** OWNER (303)237-3926 SPARLIN RICHARD F SUB (303)274-1111 Manuel Rocha 021129 Horn Brothers Roofing *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 11,884.00 FEES Total Valuation 0.00 Use Tax 249.56 Permit Fee 236.00 ** TOTAL ** 485.56 *** COMMENTS *** *** CONDITIONS *** Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be required for both the midroof and final inspections. The 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec. R806. The installation of ridge venting requires the installation or existence of soffit venting. For calculation purposes, one hat or turtle vent equal to one-half of one square foot of opening. Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. PERMIT NO: JOB ADDRESS: JOB DESCRIPTION City of Wheat Ridge Residential Roofing PERMIT - 201801080 201801080 11810 W 39th PL ISSUED: EXPIRES Reroof remove and install Malarkey Legacy 50 squares. Pitch 6/12, 3rd Party Inspection required. 04/17/2018 04/17/2019 IR4 Asphalt Shingles with 45 I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this ermrt. I further attest that I am le ally authorized to include all entities named within this document as parties to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date I . This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4, No work of an manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature olChieBuIldling Official" Date REQUESTS MUST E MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Horn Brothers Roofing A Colorado Company In Business Since 1984 2325 S. Jason Street Denver, Colorado 80223 303-274-1111 Roofing Aareement OWNER Richard Sparlin DATE 4/3/2018 STREET 11810 West 39th Place �� CITY, STATE, ZIP Wheat Rid a CO 80033 EXISTING SPECIAL ATTENTION AREAS PHONE: 303.237-3926 PHONE: ® COVER POOL/DECK ® PROTECT LANDSCAPE EMAIL: resparlin@comcast.net SPECIFICATIONS F1 t'7 TEAR OFF one f1) LAYER (additional layers extra $) GUTTERSOLD pAMAGE ANY L ( ) Yes REPLACE WITH Malarke 3 L COLOR OF SHINGLE _ Nhj' -ANY' EAS UNDER 4/12 [3 YES NO MANUFACTURER'S LIMITED WARRANTY S`E `'3(a YEARS) FIAT A TEAS:LfyqS ® NO HORN BROTHERS WORKMANSHIP WARRANTY ,�thresr 3 YEAR(J) LEAKS:.. Ar1aEt�Em No . VALLEY Closed 90# Felt SOFFITS §axed INTERIOR 11ii111tGE: WHL .F No RIDGE MATERIAL EZ Ridge XT TYPE dip/�3id9e DOFS DRIVEsAAy hAvl f RACKS - DRIP EDGE ® EAVES _ ®YES ❑ NO COTES U0 RAKES — -� HW/SW FLASHINGS [a HEADWALL REPLACE PIPE JACK BOOTS ®RIDGE VEI PAINT ROOF STACKS COLOR � j. ���_ :EXISTaNG :HYPE ItiiLIF I& W ® EAVES ® VALLEY ® PENETRATIONSCH N S) INSTALL SYNTHETIC UNDERLAYMENT.' BSLIGIS) EXTRA WORK CLEAN-UP & HAUL OFF ROOFING TRASH CLEAN OUT GUTTERS ROLL MAGNET AROUND HOUSE PERIMETER SPECIAL INSTRUCTIONS ►��ri:LLC3Zlisi'ST� • ROE SS 0. 0 RK 0.00 Afproximate date of installation: y` - Vhc� 'oe- c•4'r, ,r:.gc. Deposit amount receiv : 14!2 , 00 Payment type: L.AC pq 44 TERMS WE HEREBY PROPOSE to furnish labor and materials in accordance with the specifications, set out herein, for the SLIM of When fully executed by Company and Owner, this Roofing Agreement becomes a binding contract subject to the s of work specified herein and the terms ontthe Price.' attached Buyer's Rights and Homeowner Protection Agreement. This Agreement does not include any hidden struct I issues uncovered during the tear -off of your roof, such as bad/rotted decking, fascia, trusses, skip sheathing issues or additional layers of shingles. BILLING AGREEMENT: 10% deposit; 4�0% upon materials arrival; rem ACCEPTED BY DATE DATE 4/3/2018 Richa S arlm Insurance Carrier: f— Policy# f)L t"/' — 1 4,2,�� Phone # & Fax # ACCEPTED BY SALESMAN DATE 4/3/2018 ryan@hombrothersroofing.com cell: 720-483-0183• office: 303-274-1111 Lagenia Reimer From: no-reply@ci.wheatridge.co.us Sent: Tuesday, April 17, 2018 1:26 PM To: CommDev Permits Subject: Online Form Submittal: Residential Roofing Permit Application Categories: Gina Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address Property Owner Name 11810 W 39th PI Richard Sparlin Property Owner Phone 303-237-3926 Number (enter WITH dashes, eg 303-123-4567) L Property Owner Email Address Do you have a signed contract to reroof this property? Applications cannot be submitted without an executed contract attached below. humberto@hornbrothersroofing.com Yes Attach Copy of Executed Richard Sparlin.pdf Contract CONTRACTOR INFORMATION Contractor Business Name Contractor's License Number (This is a 5 or 6 digit number for the City of Wheat Ridge) Contractor Phone Number (enter WITH dashes, eg 303-123-4567) Horn Brothers Roofing 021129 7203912444 Contractor Address 2325 S JASON ST (Primary address of your business) Contractor Email Address humberto@hornbrothersroofing.com Retype Contractor Email humberto@hornbrothersroofing.com Address DESCRIPTION OF WORK TOTAL SQUARES of 45/ the entire scope of work: �, Project Value (contract value or cost of ALL materials and labor) Are you re -decking the roof? Is the permit for a flat roof, pitched roof, or 11884 [a Pitched roof (2:12 pitch or greater) 2 both? (check all that apply) What is the specific pitch 6:12 of the PITCHED roof?' How many squares are part of the PITCHED roof? Describe the roofing materials for the PITCHED roof: Type of material for the PITCHED roof: Provide any additional detail here on the description of work. (Is this for a house or garage? Etc) 45�, Malarkey Legacy 50 IR4 / Asphalt house SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal 3 owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Name of Applicant Humberto Cruz Email not displaying correctly? View it in your browser. City of Wheat Ridge Municipal Building 7500 W. 29b Ave. Wheat Ridge, CO 80033-8001 P: 301235.2855 F: 303,237.8929 January 12th, 2016 Owner/Occupant 11810 W. 39th Pl. Wheat Rid CO 2*033 RE: Previouslv nerrcitted iect V-8* L IIAI Owner/Occupant, This letter is being sent to you because a project for which a permit was issued by the City of Wheat Ridge Building Division and plans and/or other documents were required was recently completed and approved. In accordance are scheduled for disposal. We are writing to offer you an opportunity to retrieve those approved plans and/or documents prior to their disposal by the Building Division. The plans and/or documents must be retrieved in person at the Building Division offices. This letter must be presented at the time of retrieval of the plans and/or documents. Plans and/or documents available for retrieval CANNOT be mailed and plans and/or documents will NOT be available for retrieval after the expiration of the retrieval period, which is 60 days ftom the date of this letter. You may retrieve plans and/or documents between the hours of 7:30 a.m. and 3:30 p.m., Monday through Friday, at the Building Division offices located at 7500 W. 29"' Avenue in Wheat Ridge. Emm Melissa Mackey Senior Pennit Technician 7500 W. 29th Avenue Wheat Ridge, Colorado 80033 Of Phone: 303-2352873 Fax: 303-237-8929 Amaxi.wheatrid&-co.us I * rity of vnw.cf.wheatridge.co.us 6 City o m� heat e Buildin COMMUNiTy DEVELOPMENT - Divisio 7500 M 2 e a Wh Ridge C ail O ffice: 303-235-2 8303 - 237-8929 Inspection Line: 3 03-234-59 33 Sub C Electrical: lectric Contractors, Inc. Plumbing: Plumbing Unitd., Inc Mechanical: Smith & Millis I VAC Kk City License # 080261 W.R. City License # 140008 Kk City License # 80256 5. 0 NOT APPROVED: The Public Works Department has reviewed the submitted material and does not approve this Permit Application for the stated reason(s): David F. Brossinan, P.L.S, Date 6. Y' Stipulations: WFr- 9 ZE�iuisf=Q 7. by As-Built plans from the, Engineer-of-Record shall be A Drainage Certification Letter accompard required prior to the issuance of the Certificate of Occupancy. 8. NOTE. ANY DAMAGE TO EXISTING PUBLIC, IMPROVEMENTS AS A RESULT OF PROJEC CONSTRUCTION SHALL BE REPAIRED PER ROW CONSTRUCTIoNT PERM p OR To ISSUANCE OF THE CERTIFICATE OF OCCUPANCY IT RIOR TO --, MDEVIZIMWITEFTM IMINNIMIN I Re_submittal Fees. 3' submittal (V2 initial r ' eview fee): ... ............ $300.00 4' submittal (full initial review fee): ...... -- ... ...... $600.00 All subsequent submittals: ...... ...... $600.00 (Full initial review fee) k--� TOTAL REYI.EWFEES (due at tune of Building Pe issuance): AnDlewood at Fireside Rev. 02=4 LLIEEIISILJLEtggsillz eet Address: Doud Subdivision, Filing 2, Lot #: Applicable survey conditions: FN) (survey at foundation) NRS (survey prior to CO, if 'n 2 feet of setback) DOUD I (landscaping) DOUD2 (setbacks) Lot Size: sq. Maximum Building Coverage (40%): -5 7 A, t ft. Front 20 ft 7 Interior Side loft t l .55 Interior Rear $1( ft Perimeter Rear 10 1 Is the structure within 2 feet of minimum setbacks? (If yes, add surveying con diti on FND 1#711L r « At W ■ � Wjt no= a ! a t O • 1 Penuit Genei • Pacific Homes of i • Z j ,��:. ., .� .�: ^, �::; ,s!, s �, y t..R k r "y '§ tgt § ,.c z: t : ¢ "trl + e .i• . - , ;� _ •� ar � '* c '`s $ F t �k �s �` �s 's � s ..rp" .� e 7 � : {` t 49 a � ofAuthorized Agent Date *T appl must ys t s by eac , :e # t S 7:: 1 #i p r the t: t! kURIPS1 Geotechnical and Environmental Consultants lte>to %V,3qTWPL- zol 5 00070 I ==MlwL*jr.totojiir� - UM W= 303-759-8100 Fax3O3-756-2920 wwwagwassenaarcom As requested, we have performed a soil and foundation study at the subject site. The purpose of our study was to observe subsurface conditions encountered and to recommend geotechnical design criteria for the design and construction of the foundation for the proposed residence. This letter presents a summary of our findings and recommendations. ims glarim Ini�ilpi 111 111 1111 111 !gl '' 11 1 1 1 iI I ffl���M • 1=11 wrInnInIMIMMIJIMM MIM s. • APPROVED Subject to Field Inspections heat Rid e Building Dept. Date M Standard Pacific of Colorado, Inc. Project Number 135283 February 21, 2014 Page 2 1T#_)fflA4hL bearing on suitable materials as anticipated for design purposes, The foundation walls •ackfilled with on-site materials should • designed for a lateral earth pressure based upon an equivalent fluid density • 65 pounds per cubic foot (pcf) for the "at rest" condon or 50 pcf for the "active" condon. The "active" condition should only be used where wall movements of at least 0.5% of the wall height are allowed, These values have been provided without considerations for sloping backfill, surcharge loading or hydrostatic pressures. Construction of a drain system and proper surface drainage as discussed later in this report may lower the potential of developing hydrostatic pressure in the •ackfill materials. Minor cracking • concrete foundation walls should be expected. 0 1 ■ Standard Pacific of Colorado, Inc, Project Number 135283 February 21, 2014 Page 4 • The wetting of foundation soils and/or bedrock materials which causes heave may be reduced by carefully planned and maintained surface drainage, The following recommendations should be implemented during construction and maintained by the Homeowner after the residence is completed: as much as practical during construction. 2. The ground surface surrounding the exterior of the foundation should maintained in such a manner as to provide for positive surface drainage aw from the foundation. At completion of construction, we recommend a minimu fall away from the foundation of 6 inches in the first 5 feet. This slope s ou 41 continuous across the backfill zone. �NWWWGM ga ■ „r''"BA KFILL- 1 era t 10 I 0 TF JULY 2oto TYPICAL INTERIOR FIGURE 1 DRAIN DETAIL a 0 0 4 DD 9 - - - - - - -- rn -------------- 'roject Report i t ate. zaanuara t-acmc r-trestue tian ovoe M71-11 Designed By: Bob Guenther Total Sensible Gain: Project Date: Monday, February 17, 2014 76 Client Name: Standard Pacific -1,865 Company Name: Smith And Willis Heating And Air I. % Company Representative: Bob Guenther Btuh Company Address: 8450 Rosemary Company City: Commerce City, CO 80022 Company Phone: (303)688-4487 X- 102 Company E-Mail Address: bob0smithandwillis.com Total Building Supply CFM: 1,100 CFM Per Square ft.: 0.200 Square ft . of Room Area: 5,507 Square ft. Per Ton: 2,909 Volume (W) of Cond. Space: 53,005 Total Heating Required Including Ventilation Air: 48,227 L3tUh 48.227 M 3 Total Sensible Gain: 24,583 Btuh 100 % Total Latent Gain: -1,865 Btuh 0 % Total Cooling Required Including Ventilation Air: 24,583 Btuh 2.05 Tons (Based On Sensible + Latent) 9E 59 15% Main Trunk Summer Runouts 0.200 A Calculate: Yes 95 CFM Yes Infiltration Actual: Use Schedule: Yes Above Grade Volume: Yes Roughness Factor: 0.00300 0.01000 X 0.0157 Pressure Drop: 0.1000 in.wg. /100 ft. 0.1000 in.wg. /100 ft. Minimum Velocity: 650 ft. /min 450 ft. /min Maximum Velocity: 900 ft. /min 750 ft. /min Minimum Height: 0 in. 0 in. Maximum Height: 0 in, 0 in. Winter Summer Infiltration Specified. 0.200 A 0200 AC/hr 95 CFM 95 CFM Infiltration Actual: 0.279 AC/hr 0.279 AC /hr Above Grade Volume: X 28,403 Cu.ft. X 26 403 Cu.ft. 7,921 Cu.ft. /hr 7,9 1 Cu.ft. /hr X 0.0167 X 0.0157 Total Building Infiltration: 132 CFM 132 CFM Total Building Ventilation:. 0 CM 0 CM ---System 1 - -- Infiltration & Ventilation Sensible twain Multiplier: 1439 = (1.10 X 0.817 X 16.00 Summer Temp. Difference) Infiltration & Ventilation Latent Gain Multiplier: -21.70 = (0.66 X 0.617 X -39.04 Grains Difference) Infiltration & Ventilation Sensible Loss Multiplier: 62.04 = (1.10 X 0.017 X69.00 Winter Temp. Difference) Winter Infiltration Specified: 0.200 AC/hr (5 CFM) Summer Infiltration Specified: 0.200 AC /hr (95 CFM) Load s Sys Sys Sys Scope Net etc To To ft. /t`�,#ra Son Cain L In Net t aln den tees 11tg Act Duct Size Rudd :ng 2.05 2.05 2,688 5,507 24,583 -1,865 24,583 48,227 925 1,107 1,107 System 1 2.05 2.175 2,688 5,507 24,583 .1,865 24,583 46,227 625 1,100 1,100 25x1 Hurriddication 1,797 Zone 1 5,507 24,583 -1,665 24,563 46,430 925 1,`11.7 1,107 12x1 1 -Rec Room 839 1,104 -90 1,164 4,582 91 49 .91 7, 2 - Bath 4 52 9 .7 9 284 6 0 6 -SR 4 196 469 -18 469 1,100 22 21 22 6 4 -Unf basement 1,664 1 -225 1,903 10,606 211 85 211 6,6 -Great Room 246 2,893 -216 2,893 4,342 87 129 129 7,7 6- Kitchen/Nook 484 5,067 -275 5,067 4,244 85 227 227 8, - Dining 173 955 -112 955 1,470 29 43 43 7 8- taster SR 306 3,702 -223 3,702 4,926 98 166 166 7,7, s 9-WC 19 74 -32 74 269 6 3 5 3 3 10- taster Rath 291 1,102 -118 1,102 1,659 33 4 9 49 5 11 -WIC 93 226 -67 226 656 13 10 13 1 -SR 2 196 1,575 -54 1,575 2,556 51 70 70 6, 1 -Rath 2 44 59 0 59 80 2 3 3 3 i 14- Laundry 94 470 -113 470 1,431 29 21 29 4 15-RR 3 179 1,208 94 1,302 1,439 29 54 54 7 16 -Rath 3 60 430 -83 430 855 17 19 19 4 17 -PDR 52 69 0 69 93 2 3 3 3 18 -Study 150 1,973 -68 1,973 2,914 58 88 88 6,6 1 1 -Entry 93 815 *184 815 1,885 6 38 5 20 -Hall 276 481 -74 481 1,039 21 22 22 5 Sum of roam airflows may be greater than system airflow because stem room airflow cr tion uses the rester of fteatin or coolie . I Y:\...\Pian 5062,rhv Tuesday, February 18, 2014, 3:19 PM -- -Duct Name. SMT -100, Feeds Into: Unf basement, Fitting; 1 -01, Effective Length: 147.6 } Trunk 0.0003 18.6 527 0.000 Up; Fart 55 25 0.022 0.033 z Rect 0.8 12 1467 0.333 Presize 1,008 5.1 0.354 0446 -- -Duct Name: ST -110, Feeds Into: Unf basement, Effective Length. 3.7 Trunk 0.0003 15.2 307 0.000 Up: SNIT -100 128 20 0.010 0.000 Rect 3.7 10 0.0 0.000 Presize 427 18.3 0.354 0.446 -- -Duct Name: ST -120, Feeds Into: Unf basement, Effective Length: 2.5 Trunk 0.0003 18.6 322 0.000 Up: SMT -100 55 25 0.009 0.000 Rect 2.5 12 0.0 0,000 Presize 670 15.4 0.354 0.446 -- -Duct Name. SR-100, Supplies. Master BR, Fittings: 2 -1, -H, Effective Length. 42.8 Runout 0.0003 7 206 0.000 Up. ST -130 55 5.4 0.012 0.005 Rnd 2.7 7.7 40.2 0.005 Presize 55 4.9 0.345 0.455 -- -Duct Name: SRA 10, Supplies: Master BR, Fittings: 2 -1, 4 -t3, 8 -A2, 8 -A2, Effective Length: 78.8 Runout 0.0003 7 206 0.002 Up: ST -390 55 5.4 0.012 0.008 g Rnd 14..2 7.7 64.6 0.009 Presize 5 5 26 0.340 0.460 F s -- -Duct Name: ST -130, Feeds Into: Unf basement, Effective Length: 0. Trunk 0.0003 6.7 198 0..000 Up. ST -390 55 4 0.014 0.000 Rect 0.8 10 0.0 0.000 t Presize 55 1.9 0.350 0.450 -- -Duct Name: SR -120, Supplies; Master BR, Fittings: 2-1,4-G, Effective Length: 73.6 3 Runout 0.0003 7 206 0,002 f ' Up. ST-270 55 5.4 0.012 0.007 Rd 16.0 7.7 57.6 0.009 Presize 55 29.3 0 „341 0.459 -- -Duct Name: ST -140, Feeds Into: Unf basement, Effective Length. 4.8 Trunk 0.0003 12.9 142 0.000 Up. ST -270 55 14 0.003 0.000 Rect 4.8 10 0.0 0.000 !, Presize .. . __v.. . ------- 138 m. .... ... 19.3 0.350 0.450 j YA ... \Plan 5062.rhv Tuesday, February 18, 2014, 3.19 PM -- Duct Name: SR -130, Supplies: WC, Fittings: 2-1,4-G, Effective Length: 27. Runcut 0.0043 3 1 02 0:001 U: ST -290 128 2.4 0.010 0.001 Rnd 11.8 3.3 15.3 0.003 Presize 5 9.3 0.348 0.452 -- -Duct N ame: ST -150, Feeds Into: Unf basement, Effective Length. 1.5 I Trunk 0.0003 15.2 285 0.000 Up: ST -290 55 20 0.009 0.040 x Rect 1.5 10 0.0 0.040 Presize 395 7.5 0.351 0,449 -- -Du Name: SR -140, Supplies: Master Bath, Fitting 2-1,4-H, Effectiv Length: 40.5 - I Runcut 4.0043 5 183 4.402 Up: SMT -144 55 3.9 0.415 0.444 Rnd 15.0 5.5 25.5 0.445 Presize 25 19.5 0.348 4.452 - -- -Duct Name: 5R -150, Supplies: Master Beth, F 2 -1, 4-H, Eff ective Length: 40.5 Runcut 0.0003 5 183 4.042 Up: ST -350 55 3.9 0.015 0.444 Rnd 15.0 5.5 25.5 0.005 Presize 25 19.6 4,346 0.454 -- -Du Name. ST -160, Fe Into: Unf basement, Effective Length; 3.3 Trunk 0.0003 15.2 415 0.001 Up: ST-350 55 20 0.019 0.000 i Rect 3.3 10 0.0 0.441 Presize 577 16.7 0.351 0.449 -- -Duct Nam SR -160, Supplies: WIC, F 2-1,4-G, Effective Length: 47.3 Runcut 0.0003 4 149 0.002 U p: ST -110 128 3.1 0.013 0.004 Rnd 16.2 4.4 31.1 0.006 Presize 13 16.9 0.348 0.452 I -- -Duct Name:: ST -170, Feeds Into: Unt basement, Effective Length: 2.0 Trunk 0.0003 15.2 298 0.400 I Up: 'ST -110 128 20 0.049 4.004 Rect 2.0 10 0.0 0.000 Presize 414 10 0354 0.446 -- -Duct Name. SR -170, Supplies. BR; 2, Fittings: 2-1,4-G, Effective Length. 56.5 Runout 4.0003 6 178 0.002 Up: ST -400 55 4.7 0.011 0.005 Rnd 16.2 6.6 403 0.046 Presize 35 25.4 0347 0.453 A ;..\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM n- (�') w -- -Duct Name: ST-180, Feeds Into: Unf basement, Effective Length: 2.0 Trunk 0M03 152 235 0.000 Up: ST-190 55 20 0.007 OMO Rect 2.0 10 0.0 0.000 Presize 327 10 0.353 0.447 -- -Duct Name: ST-190, Feeds Into: Unf basement, Effective Length: 0.7 Trunk 0,0003 15.2 235 OMO Up: ST-400 55 20 0.007 0.000 Rect 0.7 10 0.0 0.000 Presize 327 3.3 0.354 0.446 . -_Duct Name: ST-200, Feeds Into: Unf basement, Effective Length: 9.3 Trunk 0,0003 152 210 0.001 Up: ST-180 55 20 0.006 0.000 Rect 93 10 0.0 0.001 Presize 292 46.7 0.353 0A47 -- -Duct Name: SR-180, Supplies: BR 2, Fittings: 2-1,4-H, 8-A2,8-A2, Effective Length: 69.0 Runout 0.0003 6 178 0.003 Up: ST-180 55 4.7 0.011 0.005 Rnd 23.2 6.6 45,9 0M8 Presize 35 36.4 0.346 0.454 -- -Duct Name: SR-190, Supplies* Study, Fittings: 2-1,4-G, 8-A2,8-A2, Effective Length: 72.6 Runout 0.0003 6 224 0.003 Up: ST-220 55 4.7 0.017 0.009 Rnd 18.3 6.6 54.2 0.012 Presize 44 28.8 0.337 0.463 -- -Duct Name: SR-200, Supplies: Study, Fittings: 2-1, 4-G, Effective Length: 67.9 Runout 0M03 6 224 0.003 Up: ST-380 55 43 0.017 0.008 Rnd 19.5 6.6 48.4 0.011 Presize 44 30.6 0.338 0.462 -- -Duct Name: ST-210, Feeds Into: Unf basement, Effective Length* 1.2 Trunk 0.0003 9.8 144 0.000 Up: ST-380 55 8 0.005 OMO Rect 1.2 10 0.0 0,000 Presize 80 3.5 0.350 0.450 --- Duct Name: SR -210, Supplies: Entry, Fittings: 2-1, 4-1, Effective Length: 23.0 Runout 0.0003 5 279 0.000 Up: ST -210 128 3.9 0.028 0M7 Rnd 0.0 5.5 23.0 0M7 Presize 38 0 0.343 0.457 Y:\.,.\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM -- -Duct Name: ST -220, Feeds Into: Unf basement, Effective Length :: . F Trunk 0,0003 9.8 79 0.000 Up: ST -210 55 8 0.002 0.000 I Rect 1.0 10 0.0 0.000 Presize 44 3 0.350 0450 -- -Duct Name: SR-220, Supplies: Bath 3, Fittings: 2 -1, 4-G, Effective Length: 44.7 Runout 0.0003 4 218 0.005 Up. ST -370 55 3.1 0.027 0.007 Rnd 19.5 4.4 25.2 0.012 Presize 19 20.4 0.339 0.451 -- -Duct Name: ST -230, Feeds Into: Unf basement, Effective Length: 1.3 Trunk 0.0003 9.8 302 0.000 Up: ST -370 128 8 0.015 0.000 ;. Rect 1.3 10 0.0 0.000 Presize 158 4 0.351 0.449 -- -Duct Name: SIB -230, Supplies: BR 3, Fittings: 2-1,4-G, Effective Length: 77.0 Runout 0.0003 7 202 0.002 r Up: ST -360 55 5.4 0.012 0.007 Rnd 10.7 7.7 57.4 0.009 Presize 54 36 0.343 0.457 -- -Duct Name: ST -240, Feeds Into: Unf basement, Effective Length: 7.2 3 Trunk 0.0003 12.9 213 0.000 Up: ST -360 128 14 0.006 0.000 Rest 7.2 10 0.0 0.000 Presize 207 28.7 0.351 0.449 -- -Duct Name: SR -240, supplies: Hall, Fittings: 2 -1, -G Effective Length* 414.1 i Runout 0.0003 5 161 0.001 Up: ST -310 55 3.9 0.012 0.005 Rnd 5.5 5.5 38.6 0.005 Presize 22 7.2 0.347 0.453 -- -Duct Name: ST -250, Feeds Into: Unf basement, Effective Length: 1.8 Trunk 0.0003 12.9 256 0.000 Up: ST-310 55 14 0.009 0.000 Rect 1.8 10 0.0 0.000 Presize 249 7.3 0.352 0.448 -- -Duct Name: SR -250, Supplies: Dining, Fittings: 2 -1, 4 -H, 8-A2, 8 -A2, Effective Length: 1.3 i Runout 0.0003 7 161 0.003 Up: ST -120 55 5.4 0.008 0.004 Rnd 40.2 7.7 51.1 0.007 Presize 43 73.6 0.347 0.453 Y.t ... \Plan 5062.rhv Tuesday, February 18, 2014, 3.19 PM Kam...... --Duct Name: ST -260, Feeds Into: Llnf basement, Effective Length: 3.5 Trunk 0.0003 152 451 0.001 U: ST -120 55 20 0.022 0.000 Rest 3.5 10 0.0 0.001 Presize 627 17.5 0.353 0.447 -- -Duct Name: SR -260, Supplies: Kitchen /Nook, Fittings: 2-1,4-H, Effective Length: 601.6 Runout 0.0003 8 324 0.002 U: T -300 55 62 0.022 0.012 Rnd 77 8.7 52.0 0.014 Presize 113 15.1 0.337 0.453 -- -Duct Name: ST -270, Feeds Into: Unf basement, Effective Length: 6.8 Trunk 0.00303 12.9 199 0.000 Up: T -300 55 14 0.006 0.000 Ret 6.8 10 0.0 0.000 Presize 193 27.3 0.350 0.450 -- -Duct Name: SR -270, Supplies: Kitchen /Nook, Fittings: 2 -1, 4 -G, Effective Length: 94.1 j Runout 0.0003 8 324 0.006 Up: ST -160 55 62 0.022 0.015 Find 273 8.7 66.7 0.021 Presize 113 572 0330 0.470 S -- -Duct Name: ST-280, Feeds Into: Unf basement, Effective Length: 4. Trunk 0.0003 15.2 334 0.001 Up: ST -160 55 20 0.013 0.000 Rest 4.8 10 0.0 0.001 Presize 464 24.2 0.351 0.449 -- -Duct Name: SR -280, Supplies: Great Room, Fittings: 2-1,4-G, 8-A2,8-A2, Effective Length: 110.4 Runout 0.0003 7 243 0.006 § U: ST -260 55 5.4 0.016 0.012 Find 35.8 7.7 74.6 0..018 Presize 65 65.7 0.333 0.467 ?!! -- -Duct Name: ST -290, Feeds Into: Unf basement, Effective Length: 0.8 4 Trunk 0.0003 15.2 287 0.000 i Up: ST -280 55 20 0.010 0.000 E Rct 0.8 10 0.0 0.000 Presize 399 4.2 0.351 0.449 -° -Duct Name: SR -290, Supplies: Great Room, Fittings: 2 -1, 4 -G, 8 -A2, 6 -A2, Effective Length: 113.1 Runout 0..0003 7 243 0.007 Up: ST -340 55 5.4 0.016 0.011 Rnd 45.8 7.7 67.3 0.018 Presize 65 84 0.332 0.468 1 YA ... \Plan 5062.rhv Tuesday, February 18, 2014, :19 PM -- -Duct Name: ST -300, Feeds Into. Unt basement, Effective Length: 3.2 Truro 0.0003 15.2 220 0.000 Up: ST -340 55 20 0.006 O.O O Rect 3.2 10 0.0 0.000 Presize 306 15.8 0.350 0.450 - -- Duct Name: SR -300, Supplies. Laundry, Fittings. 2-1,4-G, Effective Length: 36.7 Runout 0.0003 4 332 0.003 Up: ST -200 126 3.1 0.051 0.016 Rnd 5.8 4.4 30:8 0.019 Presize 29 6.1 0.334 0.466 a - - Duct Name: ST -310, Feeds Into. Unt basement; Effective Length. 7.2 Trunk 0.0003 12.9 279 0.001 Up: ST -2001 55 14 0.011 0.000 Rect 72 10 0.0 0.001 Presize 271 28.7 0.352 0.443 -- -Duct Name: SR -310, Supplies: Rath 2, Fitting: 4-G, Effective Length. 10.2 Runout 0.0003 3 61 0.000 Up: ST -170 55 2.4 0.005 0.000 Rnd 3.7 33 6.5 0.000 Presize 3 2.9 0:353 0.447 - -duct Name. ST -320, Feeds Into. Unf basement, Effective Length 1.3 Trunk 0.0003 152 297` 0.000 Up: ST -170 128 20 0.009 0.000 Rect 1.3 10 0.0 0.000 Presize 412 6.7 0.354 0.446 -- -Duct Name: SR -320, Supplies. PDR, Fittings. 2 -1, 4 -G Effective Length: 21.2 Runout 0.0003 3 61 0.000 Up: ST -230 55 2.4 0.005 0.001 Rnd 6.5 3.3 147 0.001 Presize 3 5.1 0.350 OA50 -- -Duct Dame: ST -330, Feeds Into: U'nf basement, Effective Length: 5.8 Trunk 0.0003 9.8 299 0.001 Up: ST -230 128 8 OV 5 0.010 Rect 5.8 10 0.0 0.001 Presize 166 17.5 0.350 0.450 -- -Duet Name. SR -330, Supplies: Rec Room, Fittings. 2-1,4-AD, 8 -A2, 3 -A2, Effective Length: 109.5 Runout 0.0003 7 172 0.003 Up: ST -150 128 5A 0.008 0.005 Rnd , 41.0 7.7 68.5 0.009 Presize 46 75.1 0.342 0.458 Y:1..APlan 5062.rhv Tuesday, February 18, 2014, :3:19 PM -- -Duct Name: ST -340, Feeds Into: Unf basement, Effective Length: 0,8 Trunk 0.0003 15.2 267 O;OOO Up: ST -150 55 20 0.008 O.00O Rect 0.8 10 0.0 0.000 Presize 371 4.2 0.351 0.449 i -.. -Duct Name: SR -340, Supplies: R+ c Room, Fittings: 2-1,41-AD, Effective Length: 85.3 i Runout 0.0003 7 172 0.003 € Up: ST -260 128 5.4 0.008 0.004 Rnd 31.7 7.7 517 0:007 t Presize 46 58 0.347 0.453 -- -Duct Flame: ST-350,, Feeds into: Unf basement, Effective Length: 6.3 t Trunk 0.0003 15.2 433 0.001 Up: T -260 55 20 0.020 0.000 s Rect 6.3 10 0.0 0.001 Presize 602 31.7 0.352 0.448 -- -Duct Name: SR -350, Supplies: Bath 4, Fittings: 2 -1, 4 -AD, Effective Length: 28.6 F Runout 4.0003 3 122 0.001 Up: T -250 128 2.4 0.013 0.002 Rnd 11.2 3.3 17.3 0.004 } Presize 6 8.8 0348 0.452 -- -Duct Name: ST -368, Feeds Into: Unf basement, Effective Length: 3.3 Trunk 0.0003 12.0 256 0.000 Up: ST -250 55 14 0.009 0.000 Rect 3.3 10 0.0 0.000 Presize 249 13.3 0.352 0:448 - -.Duct Name: SR-360, Supplies: BR 4, Fittings: 2-1,4-AD, Effective Length: 55.7 Runout 0.0003 6 112 0.001 Up: ST -240 128 4.7 0.005 OM2 Rnd 19.2 6.6 36.5 0.003 Presize 22 30.1 0349 0.451 r --- Duct Name: ST -370, Feeds Into: Unf basement, Effective Length: 1.5 Trunk 0.0003 12.3 190 0.000 Up: ST -240 128 14 0.005 0.000 Rect 1.5 10 0.0 O.00O Presize 185 6 0,351 0.449 - -Duct Name: SR -370, Supplies: Unf basement, Fittings: 2-1,4-AD, Effective Length: 72.4 Runout 0.0003 6 357 0.006 Up: ST -330 128 4.7 0.035 0.019 Rnd 16.2 6.6 56.2 0.025 Presize 70 25.4 0.325 0.475 4 YA ...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 P - -D uct Name: ST -380, Feeds Into: Unt basement, Effective Length: 1.7 31 I Number of active runouts: Trunk 0.0003 9.8 223 0.000 Up. ST -330 55 8 0.010 0.000 Rect 1,7 10 0.0 0.000 Presize 124 5 0.350 0.450 -- D uct Name. SR-380, Supplies. Unt ba sement, Fittings. 2 -1, 4 -AD, Effective Length: 60.6 Runout 0.0003 6 357 0.004 Up. ST -140 123 4.7 0.035 0.017 Rnd 11.7 6.6 48.9 0.021 Presize 70 13.3 0.329 0.471 --- Duct Name: °390, Feeds Into. Unf basement, Effective Length: 1.8 Trunk 0.0003 12.9 113 0.000 Up, ST -140 55 14 0.002 0.000 ect 1.8 10 0.0 0.000 Presize 110 73 0.350 0.450 - -Du Name. SR -390, Supplies. U basement, Fitting 2 -1, -AID, Effective Length: 67.1 � Runout 0.0003 6 357 0.005 Up. ST -320 128 4.7 0.035 0.018 Rnd 14.5 6.6 52.6 0.023 Presize 70 22.8 0.330 0.470 Number of active trunks. 31 I Number of active runouts: 30 Total runout outlet airflow. I 1,288 j Main trunk airflow: 1,098 Largest trunk diameter: 1 18.6 SMT -100 Largest runout diameter: 8 SR - 260 YA ..APlan 5062.rhv Tuesday, February 18, 2014 3:19 PM Smallest trunk diameter: 8.7 ST -130 Smallest runout diameter: 3 SR-130 Supply fan external static pressure: 0.800 f Supply fare device pressure losses. 0.300 Supply fan static pressure available: 0.500 ! Runout maximum cumulative static pressure loss; 0.475 SR -370 Return loss added to supply: 5.113 Total effective length of return ( ft.): 472.7 Low Total effective length of supply ( ft.): 253,9 SR -373 i Overall total effective length ( ft.): 741.7 Low to SR -370 Design overall friction rate per 100 ft.: 0.0 (Available SP x 100 / TEL) System duct surface area (No Scenario): 1279.1 Total system duct surface area: i { J p 1279.1 i s i t R i J 3 f i i 3 I t i } I a f i Y'\ ,.. \Plan 5082.rhv Tuesday, February 1, 2014, 3:19 PM -- -Duct Name: R ` T -1 00, Feeds From: Unt basement, Fittings. 5 -Hl, -L, Effective Length: 268.2 Trunk 0.0003 18.6 618 0.000, Up: Fan 75 25 0.029 0.075 Rect 0.5 12 257.7 0.075 Presize 1,288 3.1 -0.038 0.113 !, -- -Duct acne: T -110, s=eeds From: Unf basement, Effective Length: 0.5 Trunk 0.0003 18.6 345 0.600 Up: RMT -100 75 25 0.010 0.000 Rect 0.5 12 0.0 0.000 Presize 718 3.1 _0.037 0.030 -- -Duct Name: RT -120, Feeds From Unf basement, Effective Length. 2.7 Trunk, 0.0003 12.9 369 0.000 Up: RT -140 75 14 0.017 OMO Rect 2.7 10 0.0 0.000 Presize 350 10.7 -0.037 0.020 -- -Duct Name: RT -130, Feeds From: Unf basement, Effective Length: 2.' Trunk 0.0003 12.0 369 0.000 Up: RT -110 75 14 0.017 OMO Rect 21 10 0.0 0.000 Presize 359 10.7 -0.037 0.030 -- -Duct Name. RT -140, Feeds From: Unf basement, Effective Length: 1.2 Trunk 0.0003 18.6 172 0.000 Up: RT -110 75 25 0.003 0.000 Rect 1:2 12 0.0 0.000 Presize 359 7.2 -0.037 0.030 -M -Duct Name: RT -150, Feeds From: Unf basement, Effective Length: 1.0 Trunk 0.0003 M6 274 0.000 Up: RMT -100 75 25 0.007 0.000 Rect 1.0 12 0.0 OMO Presize 570 6.2 - .0.037 0.112 --Duct Name: RT -160, Feeds From: Unf basement, Effective Length: 12.8 Trunk 0.0003 10 616 OM7 Up: RT -150 75 7.8 0.052 0.000 Rnd 12.8 10.9 0.0 0.007 Presize 336 33.6 -0.031 0.106 - -Duct Name: High, Returns From: Kitchen /Nook, Fittings: 6 -R, 6- 6 -E3iC, Effective Length: 169.9 Runout 0.0003 12.9 369 0.000 Up: RT -120 75 14 0.017 0.029 Rect 0.5 10 169.4 0.029 Presize 359 2 -0.008 0.029 Y:\...\Pian 5062.rhv Tuesday, February 18, 2014 3:19 PM w - - Duct Name: Lew, Returns From: Kitchen /Nook, Fittings. 6 -8, 6 -N 8 -B3D, Effective length: 170.0 Runout 0.0003 12.9 369 0.000 Up. RT -130 75 14 0.017 0.029 Rect 0.6 10 169.4 0.029 Presize 359 2.4 -0.003 0.029 -- -Duct Name: T -170, Feeds From: Unf basement, Effective Length: 5.7 Trunk 0.0003 9,8 421 0.002 Up: RT -150 75 8 0.031 0.000 Rect 5.7 10 0.0 0.002 Presize 234 17 -0.036 0,027 -- -Duct Name: RT -180, Feeds From Unf basement, Effective Length: 6.7 Trunk 0.0003 9.8 421 0:002 Up: T -170 75 8 0,031 0.000 Rect 67 10 0.0 0.002 Presize 234 20 -0,034 0.025 -- -Duct .Name. Low, Returns From: Rec Room, Fittings: 6 -D, 6 -G, 8-A2, Effective Length: 200,7 Runout 0.0003 12.9 346 0.000 Up: RT -160 75 14 0,015 0.031 Rect 0.5 10 2002 0.031 Presize 336 2 0.000 0.031 -- -Duct Name: Mstr Nigh, Returns From :: Master BR, Fittings: 6-C, 6 -G, 12 -5, Effective Length: 37.9 Runout 0.0003 7 292 0;000 Up; RT -180 75 5.4 0.022 0.008 Rd 0.3 7.7 37,6 0.008 Presize 78 0.6 -0.026 0,008 -- -Duct Name. RT -19O, Feeds From: Unf basement, Effective Length: 1. Trunk 0.0003 9.8 281 0..000 Up: RT -180 75 8 0.015 0.000 Rect 1.5 10 0.0 0,000 Presize 156 4.5 -0.033 0.025 -- -Duct Name. Mstr Nigh, Returns From. Master BR, Fittings: 6 -D, 6 -G, 12 -5, Effective Length. 50.9 Runout 0.0003 7 292 0.0300 Up: RT -190 75 5.4 0.022 0.011 Rnd 0.3 7.7 50.5 0.011 Presize 78 0,6 -0.023 0.011 -- -Duct Name. RT -2OO, Feeds From: Unf ; basement, (Effective Length: 1.0 Trunk 0.0003 9.8 140 0.000 Up: RT -190 75 8 0.004 0.000 Rect 1.0 10 0.0 0,000 Presize 78 3 -0.033 0.O25 Y.1...\Plan 5O62.rhv Tuesday, February 18, 2014, 3.19 PM Number of active trunk 11 Number of active runo ts: Total runout outlet airflow: 1,233 Main trunk airflow: 1,2$3 Largest trunk diameter: 13.0 I MT -100 f Largest runout diameter: 12.9 Nigh 1 Smallest trunk diameter: 9.3 PIT- 70 Smallest runout diameter: 7 M tr High Runout maximum cumulative; static pressure loss: 0.031 Law Return loss added to supply: 0.113 Total effective length of return ( ft.): 472.7 Low � System duct surface area (No Scenario): 127.8 I Total system duct surface area: 127.3, Y:1 ... \Plan 5002.rhv Tuesday, February 13, 2014, 3:19 PM C Rear Entry Door: Door -R =2.8 21.4 526 0 168 168 R6.2 Door: Door- U4.161 24 ; 267 0 85 8 161315 -0w -9: Wall- 903.2 3,115 0 39 39 Basement R11 -9: Wall - Basement, Custom, R -11 1828.3 6,641 0 89 89 Basement wall 12F -Osw: Wall -game, R -21 insulation in 2 x 6 stud cavity, 2140.9 9,604 0 1,574 1,574 no board insulation, siding finish, woad studs 1613-38. Roof /Ceiling -Under Attic with Insulation on Attic 2757.5 4,947 0 3,295 3,295 Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or dark Metal, Tar and Gravel or Membrane, R -8 insulation 21 A -32. Floor - Basement, Concrete slab, any thickness, 2 2749.9 3,795 0 0 0 or more feet below grade, no insulation below floor, any float cover, shortest side of floor slab is 32° wide Subtotals for structure.. 38,242 0 17,895 17,895 People 1,000 1,156 2,156 ; Equipment. 0 1,200 1,200 I Lighting: 0 0 0 Ductwork. 0 0 0 0 ? Infiltration: Winter CFM. 132, Summer CFM. 132 8,188 -2,865 1,897 -968 Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Humidification (Winter) 4.90 gal /day : 1,797 0 0 0 AED Excursion: _ .......:. ...... ...... . 0 .. 0 2,441 ' 2 ..,.... . _. _.... . , Total Building Load Totals. 48,227 -1,865 24,583 22,718 i EM Total Building Supply 0FM: 1,109 CFM Per Square ft. 0.200 Square ft. of Room Area. 5,5017 Square ft. Per Ton: 2,909 Volume (ft) of Cond. Space. 53,005 Sensible + Latent) estimates Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are as building e and weather may vary. Be sure to select a Unit that meets both sensible and latent loads according to the manufacturers performance data • ur design conditions, Y :\ :..\Plan 5O62.rhv Tuesday, February 18 2014, 3:19 PM _fatal No on Required Including Ventilation Air: 48,227 Btuh 48.227 MBH Total Sensible Gain: 24,583 Btuh 190 Total Latent Gain: -1,865 Btuh 0 % Total Cooling Required Including Ventilation Air: 24,583 Btuh 2.05 Tons (Based On Rear Entry Door: Door - =2.8 21.4 526 R6.2 Door. Door -U =.161 24 267 15B15 -Ow -9: Wall- 9012 3,115 Basement R11 -9. Wall- Basement, Custom, R -11 1828.3 6,641 Basement wall 12F -Osw: Wall - Frame, R -21 insulation in 2 x 6 stud cavity, 2146.9 9,694 no board insulation, siding finish, wood studs 3,295 3,295 } 168 -38. Roof /Ceiling -Under Attic with Insulation on Attic 2757.5 4,947 Floor (also use for Knee Walls and Partition Ceilings), 17,895 17,895 i Vented Attic, No Radiant Barrier, Dark Asphalt 1,150 2,150 Shingles or Dark Metal, Tar and Gravel or Membrane, 1,20 0 ] y 1,20 R -38 insulation 0 { 0 21A-32: Floor - Basement, Concrete slab, any thickness, 2 2749.9 3,795 or more feet below grade, no insulation below `floor, 1,897 -968 any floor cover, shortest side of floor slab is 32' wide 0 0 Subtotals for structure. 0 38,242 People. 5 2 Equipment: 24,583 22,718 i Lighting. 0 Ductwork. 0 Infiltration: Winter CFM: 132, Summer CFM: 132 8,188 Ventilation: Winter CFM: 0 Summer CFM: 0 0 Humidification (Winter) 4.90 gal /day : 1,797 AD Excursion: System 1 Whole House System load Totals: 48,227 0 168 168 0 85 8 0 39 39� 0 89 89 0 1,574 1,574 0 3,295 3,295 } 0 0 Ii € g ! g 9 0 0 17,895 17,895 i 1,000 1,150 2,150 0 1,20 0 ] y 1,20 0 { 0 0 0 0 -2,865 1,897 -968 0 0 0 0 0 0 2 -1 ,865 24,583 22,718 i Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per AC CA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance # data at your design conditions. Y :i ...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM ) a � 1 - sl )` � i� a'•ra 1 '�� , t1 11 )1 �, t ti, l "I . . . . . . . . . . . . � qpt Data Whoi 'P M ---- ----- - . ............. Cooling System Type: Standard Air Conditioner Outdoor Model: CA13NA036 .... (A,B) Indoor Model: CNPV*4221AL*+TDR Tradename: 13 SEER PURON AC Outdoor Manufacturer: CARRIER AIR CONDITIONING AHRI Reference No.: 6395468 Nominal Capacity: 33000 Efficiency: 13 SEER Heating System Type: Natural Gas Furnace Model 59SC2B080S21--20 Tradename: Carrier Manufacturer: CARRIER CORPORATION Description: Natural Gas or Propane Furnace Capacity: 75000 Efficiency: 92.1 AFUE Y:\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Room Length: 839.1 ft. System Number: 1 Room Width: 1.0 ft. gone Number: 1 Area: 339.9 s.ft. Supply Air: 91 CFM Ceiling height: 10.2 ft. Supply Air Changes: 0.6 AC /hr Volume: 8,530.0 cu.ft. Reg. Vent, Clg: 0 CFM Number of Registers: 2 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 °lam I Actual Summer Vent.. 0 CFM Percent of Supply: 0 % I Actual Winter Infil.: 4 CFM Actual Summer Infil. 4 CFM I NW- Well - 151315 -0w -92.2 X 412:9 0.047 3.5 1,439 0.0 0 21 10.2 SF- Wall - 15815 -0w -9 14.4 X 146 0.047 3.6 523 0.1 0 1 10.2 SW- Wall - 151315 -0w -9 17 X 102 155.9 0.047 3.3 522 0.0 0 3 I NW -Cis- Atrium shgc -0.33 O %S 16 9.310 21.4 342 25.6 0 409 s W -CIs- Atrium shgc -0:33 0 °IBS 16 0.310 21.4 342 30.3 0 492 Floor-21 A-32 1 X 639.1 339.1 0.020 1.4 1,156 0.0 0 0 Subtotals for Structure: 4,326 0 935 Infil.. Win.. 4.1, Sum.: 4.1 90 2.653 256 0.657 -90 59 APD Excursion 110 Room Totals. 4,582 -90 1,104 i b F I i f Y I { Y :\ ...\Plan 5062.rhv Tuesday, February 18, 2014, 3 :19 PM Room Length: 5.3 ft. System Number: 1 Room Width: 9.7 ft. ;done Number: 1 Area: 52.0 sq.ft. Supply Air: 6 CFM Ceiling Height: 10.2 ft. Supply Air Changes: 0.6 AC/hr Volume: 524.0 cu.ft. Re q. Vent. Clg: 0 CFM E Number of Registers: 1 Actual Minter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 0 CFM Actual Summer Infil.: 0 CFM t y NW- Wall - 15515- tfuv -9 5.3 X0.2 Floor-21A-32 lo or 1A- 1 X 51.6 .. 5.2 a1. _. 0.047 3.6 194 0.1 0,020 _ �1.4 __. 7 __e _0.tf _ �� w e.e� 0 Ct � .e 4 _ � � Subtotals for structure: 265 0 4 Infil.: Win.: 0.3, Sum.: 0.3 7 2.921 19 0.615 -7 4 AFD Excursion: 1 .. Roam Totals: 284 -7 i f i i Y:\ ... \Plan 5062.rhv Tuesday, February 13, 2014, 3:19 PM ueaiculation N oae: titg. BSc C( . uccurC' t1 5; 1 Room Length: 14.7 ft, System Number: 1 E I Room Width: 13.3 ft. Zone Number: 1 Area: 108.0 sq.ft. Supply Air. 22 CFM E I Ceiling height: 10,2 ft, Supply Air Changes: 0.7 AC/hr Volume: 1,033.0 cu.ft. Reef. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent,: 0 CFM Percent of Supply: 0 % Actual Winter lnfil.: 1 CFM Actual Sumer lnfil,: 1 CFM N - Wall - 151315 -Ow -0 14.7 X 133.2 x.047 3,3 487 0.0 0 1 10.2 NW- Gls- Atrium shgc -0.33 0 %S 18 0.310 21.4 342 25.6 0 400 Floor-21A-32 1 105_Ci 11111-1-11 1-1-11111 I'll f 95 ..6 - u 1.020 1.4 _ �. 270 � 0.O e 0 0 i Subtotals for Structure: 1,040 0 410 Infil.: Wan.: 0.8, Sum.: 0.8 18 2.849 51 0 »570 -18 12 { AEt Excursion _ . .... ..... .... .... _ .... .. . _............ _... -. , 47 Room Totals: 1,100 -18 450 E i r Z E I s I I e 3 Y:l ... \plan 5082.rhv Tuesday, February 18, 2014, 3:10 PM 1,6618 ft. System Number: 1.0 ft. Zone Number; 1,664,0 sq.ft. Supply Air; 10,2 ft. Supply Air Changes. 16,915.0 cuff. Req. Vent, Cl g: I' '. (� 0 Actual Winter Vent.: 1 Percent of Supply.: pw CFM Actual Summer Vent.: SE R11 -9 5 X 50.8 Percent of Supply: 33 186 Actual Winter Infil.: 0 3 Actual Summer Infil.: 1 1 211 CFM 0.7 AC/hr 0 LJFM 0 CFM 0 % 0 I' '. (� 0 % 1 .pyy�� 10 pw CFM X 10.2 NF - !Nall Basement R 1 1 -912,5 127.1 0.051 3.7 465 0;1 0 8 X 10.2 i SE R11 -9 5 X 50.8 0.051 33 186 0.1 0 3 10.2 i NF "Wall - Basement R11 -9 8.3 X 84.7 0.051 33 310 0.1 0 5 10.2 { SF - Wall - Basement 811 20 X 2014 0.051 33 744 0.1 0 12 10.2 1 NE-Wall-Basement R11 -9 29 X 294.9 0.051 3.7 1,079 0.1 0 18 10,2 SF- WalkBasement RI 1-9 49.8 474.8 0,051 3.6 1,705 0.0 0 14 X 10.2 SW- Wall - Basement R11 -9 18 X 167.1 0.051 3.6 595 0.0 0 3 10,2 N R1 1-9 14.3 1457 0.051 3.7 533 0.1 0 9 X 10.2 SW-Wall-Basement R11 -9 14.8 150,8 0.051 37 552 0.1 0 9 X 10.2 SF -GIs- Atrium shgc -0.33 O %S 16 0.310 21.4 342 303 0 492 SF- GIs - Atrium shgc -0.33 O %S 16 0.:310 21.4 342 30.8 0 492 SW - Gi - Atrium s gc - 0.33 O %S 16 0.310 21.4 342 30.8 0 492 r Floor-21A-32 1 X 1663.8 16618 0.020 1.4 2,296 0,0 0 0 f Subtotals for Structure: 9,963 0 1,565 Infil.: Win.. 10.4, Sum., 10.4 225 2.856 643 0.662 -225 149 I AFC Excursion: _ _ F 1 8 9 Room Totals: 10,6106 -225 1,903 E Y - \ ... \Plan 5062,rhv Tuesday, February 18, 2014, 3:19 PM Room Length: 143 >ft. System Number: 1 03 Room Width: 17,2 ft. Zone Number: 1 4.5 Area: 246.6) s .ft. Supply Air; 129 CFM I Ceiling Height: 9.1 ft. Supply Air Changes: 3.5 AC/hr Volume: 2,235.0 cu.ft. Req. Vent. Clg, 9 CFM j Number of Registers: 2 SW- GIs - Atrium hgc -63.33 %S Actual Winter Vent.: 0 CFM 535 39.7" 6 Percent of Supply.: 0 % _, C? 026 _ � _� �1._ �... 441 Actual Summer Vent.: 0 CFM Subtotals for Structure. Percent of Supply: 63 % 0 2,100 I Infil.: Win.: 19.2, Sum.: 19.2 Actual Winter Infil.: 19 CFM 1,189 63.663 -416 Actual Summer Infil.: 19 CFM S - Wall- 12F - 63sw 14.3 X 9.1 1300 63.965 4.5 594 03 63 96 SW- Wall- 12F - r 17.2 X 9A 1635.9 63.6365 4.5 475 6.7 0 78 SW -GIs- Atrium shgc -0.33 O %S 12.5 0.219 21.4 257 39.7 0 384 SW -GIs- Atrium shgc -67.33 O%S 12.5 63310 21.4 267 39.7" ; 9 384 SW- GIs - Atrium hgc -63.33 %S 25 63.319 21 A 535 39.7" 6 768 2 UP _Ceml 16R 8 246 ,X, 24 � _ _, C? 026 _ � _� �1._ �... 441 . .w w 0 .. _ 294 � Subtotals for Structure. :3,153 0 2,100 I Infil.: Win.: 19.2, Sum.: 19.2 416 2.857 1,189 63.663 -416 276 $ AFD Excursion 287 Poop le... OC IatJper, 239 senfper ....... . .._ .w. -_.. .. ..._ 200 .. 230 Room Totals. 4,342 -216 2,893 t 3 1 :1.. \Plan 5062.rhv Tuesday, February 18, 2014,3:19 PM .., MINE Calculation Mode: Htg. & clg. Occurrences; 1 Room Length: 484.3 ft. System Number; 1 Room Width: 1.0 ft. Zone Number: 1 Area: 484.0 sq.ft. Supply Air; 227 CFM Ceiling Height: 91 ft. Supply Air Changes: 3.1 AC /hr Volume; 4,399.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 2 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CF Percent of Supply; 0 % Actual Winter Infil.: 13 CFM f Actual Summer Infil.: 13 CFM NW- Wail - 2F -1 15.5 X 9.1 140.71.06 4.5 0i 31 0 0 103 SW- Wall- 12F -Osw 14.9 X 9.1 54.8 0.065 4.5 246 0.7 0 40 SW -Gals- Atrium shgc -01.33 O%S 80 0.310 21.4 1,711 30.7 0 2,459 UP- Gail- 1613- 8 484.3 X 1 . 484.3 0.026 1.8 869 1.2 _ 0 579 f Subtotals for Structure.: 3,457 0 3,181 Infil.: Win.: 12.7, Sum.: 12.7 276 2.856 787 0.664 -275 183 AED Excursion: 503 Equipment; . _. __ 0 __ _ t 1,200 _ , Room Totals: 4,2444 -275 5,067 i i Y :\ ... \Plan 5O62.rhv Tuesday, February 18, 2014, 319 PM 12.3 ft. System Number: 1 # 14.0 <ft. Zone Number: 1 1,150 173.0 sq.ft. , Supply Air: ; 43 C FM I .1 ft. Supply Air Changes: 1.6 AC/hr 1,566.6 cu.ft. Req. Vent. Clg: 0 CFM 1 Actual Winter Vent.:. 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 5 GFM ? Actual Summer Infil,: 5 CFM NW- Gls{Atrium shgc -0£33 O %S 20 0.310 21.4 428 25.6 0 511 p- eil- 1613- 38172.7 1 I'll 111 ,. 172.7 0.026 1.8 310 1.2 _... -. _.. 0 ._. 207 . I'll S Subtotals for Structure: 1,150 0 736 Infl.: Win.: 5., Sum.: 5.2 112 2,.853 320 0.661 -112 74 AF1 Excursion: 95 Roam Totals: 1,470 -112 955 s i F i Z } 1 v :\ ... \plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Y:\ ...\ Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM Calculation Mode: Htg. & c1g, Occurrences Room Length: 306.4 ft. System Number Room Width: 1.0 ft Zone Number: Area 306.0 sq.ft. Supply Air: 166 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 3.6 AC/hr Volume: 2,7810 cuft Req. Vent. Clg: 0 CFM Number • Registers: 3 Actual Winter Vent.: 0 CFM Percent • Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 19 CFM Actual Summer Infil.: 19 CFM Y:\ ...\ Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM r Room Length: 3,5 ft. System Number: 1 178 Room Width: 5,5 fit. Zone Number: 1 21 Area: 19.0 sq.ft. Supply Air. 5 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 1.8 AC/hr Volume : 175.0 cu.ft. Reg. Vent. Clg: 07 CFM Number of Registers: 1 Actual Winter Vent...' 6 CFM Percent of Supply.: 01 % Actual Summer Vent.: 6 CFM Percent of Supply: 0 % Actual Winter Infil.: 1 CFM Actual Summer Infil.: 1 CFM LIP - Cell - 1613.38 19.2 X 1 19.2 01.0126 1.8 . _. - _._.. ,. Subtotals for Structure: 178 0 46 Infil.. Win.. 1.5, Sum., 1.5 32 2.863 91 OMI -32 21 AED Excursion. 7 , Room Totals: 269 -2 14 Y:\ ...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM (2/� Calculation Mode: l tg. & c1g. Occurrences: 1 Room Length: 291.2 ft. System Number: 1 Room Width: 1.0 ft. Zone Number: 1 .Area: 201.0 sq.ft. Supply Air: 49 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 1.1 /hr Volume: 2,645.0 eu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 2 Actual Winter Vent.: O CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter lnfil..: 5 CFM Actual Summer lnfil.: 5 CFM i SE- Wall- 12F -Osw 13 X 9.1 102 0.065 4.5 458 0:7 0 75 y. SE -ls- Atrium sgc -0.33 O %S 8 0.310 21.4 171 :30.8 0 246 S -Cls- Atrium shgc -0.33 O %S 8 0.310 21.4 171 30.8 0 246 UP- Ceil- 1613-38 291.2 X 1 291.2 0.026 1.8 522 1.2_ 0 348 Subtotals for Structure: 1,322 0 915 lnfil.: Win.; 5.4, Sum.: 5.4 118 2.855 337 0.661 -118 78 AEU Excursion: 1.09 Room Totals: 1,659 -118 1,102 �:\ ... \Plan 506 .rhv Tuesday, February 18, 2014, 3 :19 PM Room Length: 73 ft. System Number: 1 466 # Room Width: 121 ft. Zone Number: 1 44 ! Area: 93.0 sgxft. Supply Air: 13 CFNI Ceiling height: 9.1 ft. Supply Air Changes: 0.9 AC/hr Volume: ' _ 344.0 cu.ft. Req. Vent. Clg: 0 CF Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply,: 0 % Actual Summer Vent.: 0 CFI € percent of Supply: 0 % Actual Winter Infil.: 3 CFI Actual Summer Infil.: 3 CM UP -Ceil- 1613-38 92.9 1 . r _ ..� , . .... _ . �� . _ 92.9 0.026 1.8 167 1.2 _ �. _ ..�r �.. �. _ �w ._ 0 . _. .... ...... 111 Subtotals for Structure: 466 0 130 ! Infil.: Win.: 3.1, Sum.: 3:1 67 2,855 190 0.661 -67 44 ! AED Excursion .._.w e� .. _ _e _ .._� ._� ... ... 2 ._ .� �.. Room Totals. 656 -67 223 i 3 I 1 i 1 1 i 1 I I i I Y :t :..\Plan`5062.rhv Tuesday, February 18, 2014, 3 :19 PM .,. 0 Room Length: 195.8 ff. System Number: Room Width: 1.0 ft. Zone Number: Area: 198.0 sq.ft. Supply Air: Ceiling Height: ` 9.1 ft. Supply Air Changes: Volume: 1,778.0 bu.ft. Req. Vent. Clg: Number of Registers: 2 Actual Winter Vent.; Percent of Supply.:. Actual Summer Vent.: Percent of Supply: Actual Winter lnfil.: Actual Summer Infil.: 1 � 1 82 70 CFM 2,4 AC/hr 0 CFM 0CFi 0 % 0 CFM 0 % 12 CFM s 12 CFM SE-Wall-I 2F-Osw 11.5 X 9. 1 84.4 0.065 4.5 879 0.7 0 82 SIB -Cis- Atrium shgc -0.33 0 %S 20 0310 21,4 428 30.8 0 815 { UP -Ceil- 1813-38 195.8 X 1 < 195,8 0,028 rr. 1 Subtotals for Structure: _ 1,830 0 1,021 i i r � Y:\ ... \Plan 5082.rhv Tuesday, February 18, 2014, 3:19 PM Room Length: 83 !ft. System Number: Roam Width: 5.3 ft. Zone Number: Area. 44.0 sq.ft. Supply Air: Ceiling Height: 9.1 :ft. Supply Air Changes: Volume: 403.0 cuft. Req. bent. Clg: Number of Registers: 1 Actual Winter Vent.: Percent of Supply.: Actual Summer Vent.: Percent of Supply: Actual Winter Infil.: Actual Summer Infil.: 1 I CF1 0.4 AC/hr 0 CFNI 0 C M 0 % 0 CF/I 0 % 0 CFM 0 CFM Y:\ ... \Plan 5062.rhv v Room Length: 7.5 >'% System Number: 1 I Room Width: 12.5 ft. Zone Number: 1 I Area: 94.0 s.ft. Supply Air: 29 CFM F Ceiling Height: 9.1 f. Supply Air Changes: 2.0 AC /hr Volume: 852.0 cu.ft, Req. gent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM G Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 5 CFM Actual Summer Infil.: 5 CFM NE- Door -Rear Entry boor 2.7 X 21.4 0.357 24.6 526 7.9 0 168 i 8 UP- Cell- 10S -38 93.8 X 1 93.8 0.026 1.8 168 1.2 . _ _ 112 Subtotals for Structure: 1,107 0 348 Infil.. Win.: 5.2, Sum.. 5.2 114 2.855 324 0.661 -113 75 i AED Excursion. N _ Room Totals. 1,431 -113 470 Y :l ,,. \Plan 506 .rhv Tuesday, February 18, 2014; 3:19 P Room Length: 179.3 ft. System Number. 1 l # Room Width. 1.0 ft. Zone Number. 1 Area. 179.0 sq.ft. Supply Air. 54 CFM Ceiling Height ft. Supply Air Changes. 2.0 AC/hr Volume. 1,628.0 cu.ttK Req. Vent. Clg. 0 CFM Number of Registers. 1 Actual Winter Vent. CFM I Percent of Supply.. 0 % Actual Summer Vent.: 0 CFM Percent of Supply. 0 % Actual Winter lnfil.: 5 CFM Actual Summer lnfil.. 5 CFM NW-Wall-12F-O NW-Wall-12F-Osw 11.7 X 9.1 86 0.065 4.5 886 O.7 0 63 NW -Gis- Atrium shgc- 0,33 O %S 20 0310 21.4 423 25.6 0 511 1 UP -Cell- 1 613 -38 179.3 X 1 179.3 0,026 1.8 322 12 0 214 Subtotals for Structure. 1,136 0 788 1 lnfil.: Win.: 4., Sum.: 4.9 106 2.859 303 0.661 -106 70 AED Excursion: 120 ;s People: 200 latlper, 230 sendper. . , w. ., _ 200 230 Room Totals: 1,439 __ 94 w,- ,-._._ _._.._. 1,208 l l I I { z i 2 I z l s i I ..__..w_ )(:\ .., \Plan 5062.rhv Tuesday, February 18 2014, 3:19 PM 60.4 ft. System Number: 1.0 ft. Zone Number: 60.0 sq.ft. Supply Air: 91 ft. Supply Air Changes: 549.0 cu.ft. Req. Vent. Clg: 1 0 Actual Winter Vent.. 4 CFM Percent of Supply.: CFM -83 Actual Summer Vent.: 7 j Percent of Supply. Actual Winter Infil.: Actual Summer Infil.: 1 8 0.310 21.4 171 25.6 1 P 19 CFM .1 AC/hr 0 CFM 0 CFM 0 % 0 CFM 0 % 4 CFM Room Totals:. CFM NW-GIs-Atrium shgc -0:33 O %S 8 0.310 21.4 171 25.6 0 205 UP- Ceil- 16S -38 60.4 X 1 60.4 0.026 1.8 108 12 0 72 Subtotals for Structure: 617 0 332 Infil.. Win.: 3.8, Sum.. 3.8 83 2.858 238 0.661 -83 55 AFt3 Excursion. 43 Room Totals:. 855 -83 430 7 j �:\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM atcuration cae: tItg. & c1g. occurrences: 1 Room Length: 92 ft. System Number: 1 1 Room Width: 5.7 ft. Zane Number: 1 Area: 52.0 sq.ft. Supply Air: 3 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 04 AC/hr I Volume: 472.0 cuft. Re. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 l Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 0 CFM Actual Summer Infil.: 0 CFM Y :\ ... \plan 5052.rhv Tuesday, February 18, 2014, 3:19 PM,-, Calculation Made: Htg. & clg. 0.088 Occurrences: 1 03 Room Length: 149.9 ft. System Number: 1 4.5 Room Width: 1.0 ft. Zone Number: 1 20 Area: 150.0 sq ft: Supply Air: 88 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 3.9 AC/hr Volume: 1,362.0 cu.ft. Reif. Vent. Clg: 0 CFM Number of Registers: 2 0 Actual Winter Vertu.: 0 CFM 2,148 Percent of Supply.: 0 % I Infil.: Win.. 12.4, Sum.: 12.4 268 Actual Summer Vent.: 0 CFM -268 178 c AED Excursion: Percent of Supply: 0 % Actual Winter Infil.: 12 CFM a W Actual Summer Infil.: 12 CFM NF- Wall- 12F -Osw 12.7 X 9.1 95 0.088 4.5 426 03 0 70 SF- Wall- 12F -Osw 5 X 9:1 45.8 0.065 4.5 205 0.7 0 34 $ NW -Cis- Atrium sh e -0.33 O %S 20 0.310 21.4 428 25.6 0 811 NF- Cis-Atrium shgc -0.33 O %S 20 0.310 21.4 428 25.6 0 511 UP -C il- 1613-38 149.9 X 1 149.9 0.026 1.8 269 1.2 0 179 1 Subtotals for Structure: 2,148 0 1,369 Infil.: Win.. 12.4, Sum.: 12.4 268 2.856 766 0.664 -268 178 c AED Excursion: 196 People: 200 la r, 230 senfper: . 1 _ a W _ 200 23(} Room Totals: 2,914 -68 1,973 i 3 1 �:\ ...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM �3a5ma 5062.rhv Tuesday, Februar /!% 204 3:49 RU �.�� y -,�< °� Z� �■ « <, » �. : « � ?.l.K.�z,y << f »« .« » <4 #�� # . : -!« .t : ■ ! < 2: »© © <� <.,�: ■ s « t «�! <� -� ®� t#w. «° «� !� ■ �� � � - � �!! « ,�, • : : ■' ■ ° ■ ;■ « ■ „ f�: \ „ < < ! ^; « :�; , !� a w: <� 4 y !t < ■ «,■ .�, «.� a ] �� ® ..■ 4 �l © � ! ■ <� �; �r� ?444 »� � »r! :24 ■ � . � &� < ■ �� :t2 ■.�, �,;• � <■ <. : «� ■� f,, »!t� �� ■• ■ © �3a5ma 5062.rhv Tuesday, Februar /!% 204 3:49 RU �.�� y 276.2 ft. System Number: 1 Subtotals for Structure: 1.0 ft. Zone Number: 1 74 2.351 212 0.661 276.0 sq.ft: Supply Air: 22 CFM 9.1 ft. Supply Air Changes: 0.5 AC /hr I 2,509.0 cu.ft. Req, Vent. CIc3: 0 CFMs 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 3 CFM Actual Summer Infil.: 3 CF UP -Cei 1 5 -33 2752 , .1 . _ .. ... `.._ 0.026 e , ... _ „_ ... , _495 _.. �.. _ 1 . 2 .�... _... a; _a .. _ �; ._. ..3 Subtotals for Structure: 327 0 334 Infil.: Win.: 3.4, Sum.: 3.4 74 2.351 212 0.661 -74 49 AED Fxcursion: ...... _ �. . f Boom Totals: 1,039 -74 461 f t i }} 1 i 3 i R 3 E 1 r:\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3 :19 PM I Rec Room 839 4,582 91 7,7 1,104 -90 61 91 2 Bath 4 52 284 6 3 9 -7 0 6 3 BR 4 196 1,100 22 6 468 -18 26 22 4 Unf basement 1,664 10,606 211 6,6,6 1,903 -225 166 211 5 treat Room 246 4,342 86 7,7, 2,893 -216 161 129 6 Kitchen /Nook 484 4,244 85 8,8 - 5,067 -275 282 227 7 Dining 173 1,470 29 7 - 955 -112 53 4 8 Master BR 306 4,926 98 7,7,7 - 3,702 -223 206 166 9 WC 19 269 5 3 _ 74 -32 4 5 10 Master Bath 291 1,659 33 5,5 - 1,102 - 118 61 4 11 WIC 93 656 13 4 - 226 -67 13 13 12 BFI 2 196 2,556 51 6,6 - 1,575 -54 88 70 13 Bath 2 44 80 2 3 - 59 0 3 3 3 14 laundry 94 1,431 29 4 470 -113 26 29 15 BR 3 179 1,439 29 7 1,208 94 67 54 16 Bath 3 60 855 17 4 - 430 -83 24 19 17 PDR 52 93 2 3 - 69 0 4 18 Study 150 2,914 58 6,6 - 1,973 -68 110 88 19 Entry 93 1,885 38 5 - 815 -184 45 38 20 Hall _w_.. ...,. w... _ 276 .,_.. _.,.....,, 1,039 _ e._. 21 ..,_...... 5 ,... _ ,.._....._ - 481 . .._.,..,_ ., -74 . �._....��.�.� 27 _......, 22 _..,._.._.. Humidification 1,797 System _ .total _ 5,507 .: 48,227 . 92 . 5 _._. , . _ _v m._ 24,583 w _ 1,865 ._._ 1,100 System 1 Main Trunk Size. 25x12 in. Velocity. 527 ft. /rain Loss per 100 ft.. 0 «022 in.w j Duct size results above are from Manual D Ductsie. Runout duct velocities are not printed with duct size results from Manual D Ductsize since they can vary within � the room. See the Manual D Ductsie report for duct velocities and other data. 2.75 Carrier Natural Gas or Propane Furnace 92.1 AEUE 75000 33000 n/a 33,000 Btuh n/a 0 Btuh n/a 6395468 YA ...!Plan 5062.rhv Tuesday, February 18, 2014, 3.19 PM . I Zone 1, 1,330 23 -1,865 1.99 90° Southeast 1,259 22,646 -1,865 1.89 1 Rec Room *91 91 91 91 91 91 91 91 7,7 2 Bath 4 -1,865 6 6 6 6 6 6 6 , 1,147 20,631 SR 4 26 22 25 33 28 22 28 *33 6 4 Unf basement - *211 211 211 211 211 211 211 211 6,6,6 5 Great Room 161 *181 140 91 131 160 145 110 7,7 6 Kitchen /Nook 282 *315 247 168 231 278 254 198 8,8 7 Dining 53 36 51 60 54 40 54 *60 7 8 Master SR 206 *211 181 138 175 194 191 159 7,7,7 9 WC *5 5 5 5 5 5 10 Faster Rath *61 50 59 60 51 38 51 60 5,5 11 WIC *13 13 13 13 13 13 13 13 4 12 RR 2 *88 73 84 85 73 57 73 85 6,6 13 Rath 2 3 *3 3 3 3 3 3 3 3 14 Laundry *29 29 29 29 29 29 29 29 4 15 RR 3 67 51 65 72 66 52 66 *72- 7 16 Bath 3 24 17 23 26 24 18 2 *26 4 17 PIER 4 *4 4 3 3 3 3 3 18 Study 110 108 *112 102 110 102 105 95 6,6 19 Entry 45 *54 47 38 44 48 41 38 5 20 Nall 27 *27 26 24 24 24 24 24 5 # r.. # 45 Fast 1,330 23 -1,865 1.99 90° Southeast 1,259 22,646 -1,865 1.89 135 South 1,076 19,345 -1,865 1.61 180 Southwest 1,193 21,460 -1,865 1.79 225 West 1,193 21,448 -1,865 1..79 ; 270 Northwest 1,246 22,413 -1,865 1.87 # 315 North 1,147 20,631 -1,865 132 * Indicates highest value of all rotations. Y:1 ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 Pal Y A ..APlan 5062.rhv Tuesday, February 18, 2014, 3:19 PM .,.� Sam Sam 19am 11 am 12prn 1 pm 2pm 3prn 4pm 5pm &pm 7pm 1 Time of Cloy I Front door faces Northeast Frontdoorfaces East Front door faces Southeast Frontdoorfaces South Front door faces Southwest Front door faces West Front door faces Northwest Front door faces North Y:1.,.\Plan 5 5 .rh r ; Tuesday, February 18, 2014, 3:18 P Furnace = Carrier Model 59SC2B080 S21--20 (80000 BTU) Air Conditioner = Carrier Model CA13NA036****(AB)) (3 Ton) Evaporator Coil = Carrier Model CNPV*4221AL*+TDR (3.5 Ton) Duct Summary 7 IR7 z 0 z 10 z z 4': w ON tW V - ffT - • lgmtglgxi� py ad pm CD Ya x , py ad pm CD Ya ,a± » #,v� 2, y ..c » � *±: � » * #2y ©4 ± ��• °a: a.: :� m a v m < ««y��� }22 »� ;�ws.w ?m » »+ »< : «& ©+< �� � . .. : w , \ \ \ \\ �f� �/ »x «ww,a. \ \ \K \�� . �� .v � m « -� \ \ » » »< \� \��� �} .0 �. w : «az�.d6 :, } a :: � \?- « »,: _ � �. U . . � « .� � � �\ :.�c© � 2 �. » � ©�- asa,... ~���� m \\ \\ � \/« /� �\ / . ._.,_m. P#oTg'.^. 0 unfinished bas,ement, matted as deslaned, but delete the batty supper and mover return to basement calling (same size} pipe and grOW to open area at teest 10 feet from water heater z Y4x4b^`.'S'3a cvst.r,�Fartsxrm SR `,4&CFU,neg;IOi4 BR• CFAt,RSg €toxa CPf.I,Flcg:10x4 awr.dwvwb k 58440,5",22 CfU,Rg10.4 $R CRe,fi.910.4 CFMAVAO.4 CFM,Rn1ft4 $R CFUR*q1ft4 5Wm,7",65 CMA":10.4 rwo.o Oil 3 l0T " ,6,44CfM,RAQX4 . . ........... ssel T k POR -,,,5R-320,3',3CFUu*V1ft4 I V SR 3$ CFM,R"1W4 C 24 K 02 CPU, P..wk, MM,r,l 13 CFU,RgA0. S I R-300,4",29 CFMR*ll1Q.4 wwmw— f-, EE Oah V-IftF, swmqy Fl-4r+vF oft Matt M NOR mm, Wgk 14.10,3" UMAMW14.14 Mur Lnw,r,?$ CFMGrW*12 kk h sea, R — tht. 41.1 LOW i SR-100,7",55 CFUft:t0v� I li *1w 't.W,140W%369 CfMGAftA4.14 OR2 MASS OR 149ir TMOK 04% w SR CFMR"1ft4SR CFUAo§A0x4 CMA"A0.4 " Rig ( III M ARE lif LAX" $XA40X,t5 UMA"10.4 RUM70 WELTWKYAMUM THAT install Balancing Crimpers on Alt Supplies SMIREDASUK)"ONnMf,An .... ........ ..... --4 -- ----------- .. ........ .. ..... ..... . PAGE SIM 17XIV STANDARD PACIFIC HOMES MAIN FLOOR Drawn: SCAM 1/0" VV Appved� FIRESIDE Date: PLAN 5062 WORST CASE SCENARIO Job Number --------------- . . ...... ........ ................... . . . -------- .... ........ City of W3.6atR I d C ,,,�g COMMUNny DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033-8001 P: 303,235.2846 F: 301235,2857 March 20, 2014 OFFICIAL ADDRESS NOTIFICA Z2IR!EAjMNMP CODE CORRECTION NOTIFICATION is hereby given that the following address has been assigned to the property/properties as indicated below: PROPERTY OWNER(S): Standard PaciFic of Colorado Inc. A Delaware Ca ration OLD ADDRESS: None '90 abor Cr. Wheat Ri d e Co '0033 '0 NEW ADDRESS: 3 "0 't'ab � or Ct. 80033 Block 1_ Lo t25 3870 ab I or Ct. 80033 033 3 60 1, ab 8 or Ct Ile t Ri e C W 0�810033 80033 3 5 Ta b or 8 0 T or Cr. Ct W heat R i C e 081 Blac o 'oc t 2 8 Block 1 -Lor 6 3801 Taft Ct. Wheat Rtd e C{ 3 3830 T abor Ct. Tab block l _ I of 3819 `Taft Ct, Wheat I2id e CC) 3 Black 1 Lor 9 3829 Taff Ct. Wheat Rzd CC 3 Black t -Lot 10 3839 "Taft Ct. Wear Rid e CC? 33 Stock l _Lot 11 384 Tafr Ct. Wheat Rid e C) 33 Black 1 -Lor 12 38E9 Tafil Ct. Wheat laid >e C( 33 33 Block I Lot t4 3889 Taft Ct. Wheat Rid e CCU 33 'oc "o' '90 abor Cr. Wheat Ri d e Co '0033 '0 Block I - Lot 4 3 "0 't'ab � or Ct. W heat: e R id 80033 Block 1_ Lo t25 3870 ab I or Ct. Wheat Ri e 0 80033 C B l ack 1 Lot 26 3 60 1, ab 8 or Ct Ile t Ri e C W 0�810033 S to c k Lot .1 1 7 3 5 Ta b or 8 0 T or Cr. Ct W heat R i C e 081 Blac o 'oc t 2 8 384 Ta b 0 or Ct' t R ea 80 0 0033 d e �Q� : Mac k 2 I -ot 9 3830 T abor Ct. Tab i Co hea R �e 33 �( 8 � �ock I Lot 30 38 0 or Ct Wheat Co e R id 80�033 3 Black 2 - Ilot 3 383E `Taft Ct. Wheat. Rid e CCU 80033 Black 2 - Lat 4 3848 Taft Ct. Wheat Rid e fC} 3 3 33 WWWA-Wheatridgexo.us I 1] IM1 4 JIM I I I 101 (Block l,ot 1 2 3871 Tabor Q. Wheat Rid (Block 2 – Lot 13) 3861 Tabor Ct.,Wheat Ridge, co 8o033 Block 2 -• -Lot 14 3851 Taber Ct. Wheat Rid e CC) 80033 (Block 2 -.- Lot 15113841 Tabor Ct,,Wheat Ridg cO 80033 fRIA01- I – T tit I Al 'A R I I 'rnl nr Of 1X71-4 DA,.- f^t onlill SUIRDIVISION: Doud Overlook Subdivision aka Fireside at Youn field Subdivision LOT(S): KEY: SECTION: — JEFFERSON COUNTY RECEPTION #: 2013143668 9mmmusm NOTES: This is a courtesy notification, AUTHORIZED BY. DATE: JUL-11timu NOTE: Please notify all other parties concerned. ADDRESS MAP UPDATED BY: DATE: R69W 601 ALUM. PPE W/ 3 -1/4 GRASS CAR EO STAMP LS 13212' N RANK 8O% PONT 14109 N-708326.7466 E- 1025512566 T35, P.2' I I I I 1 I i I I I I I� i� 1 I, M la IY� IW I I LOT 11 3819 0710 38M P p TV s s O 11858 11842 11828 NEST 39TH PLACE 0 2 1871 11851 RP 11831 G 2 11811 • 0 0 o s 398 H.O.A. C 3881 LOT 7 LOT 12 3884 3871 LOT 6 LANDSCAPING 3872 LOT 13 3881 LOT 5 C 3550 LOT 14 I 3851 3821 LOT 4 3848 LOT 15 3841 LOT 3 3836 1 <\ 1 0 LOT 22 11810 TRACT 8 E. 1/4 CORO" SEC. 20 T35, R69W 6TH P.Y. S AIW. i'Pf W/ 3 !BASS CAP l STAIIREEI ,313=13- N RAHOE E01 05310 ADDRESS PLAT PONT 14209 11212' N 9 RA" 0.1 a•0 DOUD OVERLOOK SUBDIVISION FILING NO. 2 BEING A REPLAT OF A PORTION OF DOUD OVERLOOK SUBDIVISION, --� LOCATED IN THE WEST HALF OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 20 AND THE WEST HALF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 29, `s TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN, I CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO 48 LOTS, 5 TRACTS & PUBLIC R.O.W. — 14.872 ACRES I 1 r 1 LOT 23 3890 1 rI �1 I TRACT USE I A 1 HO.A LOT 16 3831 1 H.O.A. C t UTUTE3 LOT if D UTRITES DRAINAGE k EYEROENCY ACCESS LOT 2 E LANDSCAPING N.O.A. TRACT C 3889.5 LOT 14 C 3m I 3824 3821 LOT 24 3880 h LOT 25 3870 M I LOT 26 3880 LOT 27 3850 LOT 28 3840 LOT 29 3830 1 * I LOT 17 - - - - * I j I 1 3812 11831 O M LOT 8 LOT 1 _ LOT 30 MI 3819 O 11871 3820 1 C I y8T11 PU►_�� POINT a T LS ,ea7 _r LOT 7 w -' TW •1RACT 0 LOT 31 + Lr 11820 t — 'a UN v K I? 3610 BRASS CAP y1p 11880 c r�oR7risioo 1331:• N RANK NI2 I 11890 11880 1 N- 7056727126 E- 1025618715 I 3801 W N O 3800.5 1RACT SE 1/4 SEC. 20� CAP 1 0 of ��` `� 1M►Tf �— _—J DD05TM0 \ I I2' LIB I N I I 1 I I IR TRACT USE TABLE TRACT USE OWNER A LANDSCAPING HO.A 8 DETEMI110H POND k VTMUTES H.O.A. C t UTUTE3 H.O.A. D UTRITES DRAINAGE k EYEROENCY ACCESS H.O.A. E LANDSCAPING N.O.A. 1 N N.O.A. -HOME OWNERS ASSOCIATION 1� I I I IEOE10 1 Nlocx ,RrLR SICWaR COINER R4W. RMT -OF -MY "ammy Lm LOT LINE 0057N0 PLATS rz:71cm uw ROAD O911ER Lm I x I 1 -4 POINT Of OMSV ICDIENT BE CORRNf SEC 20 TM. RRf 6TH P.Y. AWL PPE W/ 3-1/4 BRASS CAP STATED. %S 13512' N RANK BOX PONT ism — — N-705701.5458 E.1052301675 I I— 'SCALE: 1" - 60' CPI Vry.AL tPAOM: _:..LI DEVELOPER ENGINEER \SURVEYOR rlr`■rsn.�6 *"DAIQDPACtfjcHomjs CA RROLL& LA NGE- MA N HARD •/•RV6,Nro anLelA1►a aoYRWPn V A .P. a •et1`..- ��ira: �WriWR.i...�ow1• LOT 16 i LOT 17 11874 ' 1182'0 LOT 16 { I 3901 I 11900 I I LOT 15 V 3899 1 1 I TRACT C 3889.5 LOT 14 1 I 3WO I f LOT 13 j 3879 LOT 12 i � � "� d 3889 I