HomeMy WebLinkAbout3829 Taft Court30q Wr_ 64 INSPECTION RECORD
INSPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/inspection
INSPECTION REQUEST LINE: (303) 234-5933
Occu a /T e
__ W.�.
Inspections will not be performed unless this card is posted on the project site.
**Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.**
Inspector Must Sign ALL Spaces pertinent to this project
Foundation Inspections Date Inspector tials Comments
Ini
Pier
Concrete Encased Ground (CEG)
Foundation / P.E. Letter
uti rvui your i.nnr_rPrp v riinr I n unno-nunii r IT I nn nhwn ii�__.,..f:.... e.
Underground/Slab Inspections Date
Inspector Comments
Initials
Electrical
Comments
Sewer Service
Plumbing
1•>\'l•la iv/ata I If Ia 9019019 IS If 1K0lM1.1ara'J// I fiA7Y-181Vlreld'41111 J mi Val AIN rl TJ.ITGI NMI 2M�.T.7A S717T_7 RT_7�T7T9-'!T�
Rough Inspections
Date
Inspector
Initials
Comments
Wall Sheathing
Mid -Roof
-I 2-1 'Z
I P
141 - n C
Lath / Wall Tie
Rough Electric
Rough Plumbing/Gas Line
Rough Mechanical
Rough Framing
Rough Grading
Insulation
Drywall Screw / Nail
Final Inspections
Date
Inspector
Initials
Comments
Landscaping & Parking / Planning Dept.
Inspections from these entities should be requested
one week in advance. For landscaping and parking
inspections call 303-235-2846. For ROW and drainage
inspections call 303-235-2861. For fire inspections
contact the Fire Protection District for your project.
ROW & Drainage / Public Works Dept.
Floodplain Inspection (if applicable)
Fire Inspection / Fire Protection Dist.
Final Electrical
Final Plumbing
Final Mechanical
Roof
_
T
Ti�
Final Window/Doors
Final Building
NOTE. All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate
of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy.
•••V V....." � — ulu. ivuy�I I10Pal.UUI1D GIC W1I1P1CIeU Ilulll It ie rlre uistrici ana electrical low voltage
by the Building Division.
Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued
Protect This Card From The Weather
A City of Wheat Ridge
Residential Roofing PERMIT -201704628
PERMIT NO: 201704628 ISSUED: 07/24/2017
JOB [ADDRESS: 3829 Taft CT EXPIRES: 07/24/2018
JOB DESCRIPTION: Residential Re -roof to install Owens Corning asphalt shingles with ROOF
DECKING - 41 sq.
*** CONTACTS ***
OWNER (303)931-2534
LUELLEN AMANDA
SUB (303)981-1265
Jon Lowrie
100243 Monarch
Construction & Roofing
*** PARCEL INFO ***
ZONE CODE:
UA / Unassigned
USE:
UA / Unassigned
SUBDIVISION CODE:
2403 / APPLEWOOD
VILLAGES, PROSPECT V BLOCK/LOT*:
0 /
*** FEE SUMMARY ***
ESTIMATED
PROJECT VALUATION:
24,300.00
FEES
Total Valuation
0.00
Use Tax
510.30
Permit Fee
442.05
** TOTAL **
952.35
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) requires an approved inspection
prior to installation of ANY roof coverings and is require on the entire roof when spaced
or board sheathing with ANY gap exceeding one half inch exists. Asphalt shingles are
required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and
water shield is required. Eave and rake metal is required. A ladder extending 3 feet above
the roof eave and secured in place is required to be provided for all roof inspections.
Roof ventilation is required to comply with applicable codes and/or manufacturer
installation instructions, whichever is more stringent. In order to pass a final inspection
of elastomeric or similar type roof coverings, a letter of inspection and approval from the
manufacturer technical representative stating that "the application of the roof at (project
address) has been applied in accordance with the installation instruction for (roof
material brand name) roof covering" is required to be on site at the time of final
inspection.
Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd
party inspection report will be collected at final roof inspection performed by City of
Wheat Ridge. If report is not available the final inspection will not be completed.
The City of Wheat Ridge
Third Party rorm Check List
1pi hm+ 12-, -f (0 50037.,
pl-Operty Address 1
Permit NuMber
IN L41
Pqrmit lesued 00tQ1
Property Owner InformatI011
propo_r heAf
,ty Owqe,,r Address
LqMcLor laformatign
inspection Company
Inspector Name
inspector Contact info.
over, All roofs
hearby ov of t Ridge Buiding Dept.
that are un the building has been inspected
10
I hearby a
and found to be in compliance with the minimum requirements of the 2012 IRC and 2012
let aes
C, os as all r, I s and Procedure and Manufacture
ity of Wheat Ridge polio
ond specifICAtiOns.
Date'.
M nt
referenced above and I give
I hearby a perform my roof inspection
my consent 'ion.
in iieu of theDate:
Propery Ow,110 Agent'
This original document and pe it card, as well as the roofing check list, must be submitted tc
the Chief Building official within seven days of the final inspection.
Drop off in person l3
p(,,rmjt counter 2nd floor
7500 M 29th Ave
Wheat Ridge CO 60033
• 3 S3, 0
Draft Date: 7/26/17 Ile
0
Please add note to reverse side
Amanda , , Pic k -y
Luzl1,
(Jon)
The City of Wheat Ridge
Inspection Check List notes 1
Final Roof
��i� `1 0
0 I l �4D
Roof Inspection
❑ N/A
❑ Pass
❑ Fail
❑ N/A
Pass
❑ Fail
Structural roof components
❑ N/A
N1 Pass
❑ Fail
Verify that no more than 2 layers of shingles exist
❑ N/A]
Pass
❑ Fail
Flashing for roof and walls
Pass
❑ Fail
If new sheathing is installed verify that it is listed in the
permit description (Valuation must be adjusted)
❑ N/A
Pass
❑ Fail
Verify sheathing nail pattern (See Policy & Procedures)
N N/A
❑ Pass
❑ Fail
Crickets and saddles where needed
❑ N/A
N Pass
❑ Fail
Verify B vent must have boot same gauge as pipe
❑ N/A
Pass
❑ Fail
Verify vent caps
❑ N/A
Pass
❑ Fail
Verify no flashings are damaged or rusted
❑ N/A
Pass
❑ Fail
Step flashing shall be min. of 4x4 piece per shingle
"R N/A
❑ Pass
❑ Fail
Verify scuppers allow for proper drainage
❑ N/A
Pass
❑ Fail
Ice and water shield 2' in heated wall spaces
❑ N/A
Pass
❑ Fail
Underlayments must follow 2012 IRC / 2012 IBC
❑ N/A
[] Pass
❑ Fail
Verify roof slope for proper drainage
❑ N/A
[� Pass
❑ Fail
Dripedge shall have min of 2" overlap
❑ N/A
1� Pass
❑ Fail
Dripedge should extend down min 2" past roof deck
❑ N/A
® Pass
❑ Fail
Dripedge shall be mechanicaly fastened 12" OC
N/A
❑ Pass
❑ Fail
00 LB roll roofing shall not be applied to roof slopes
less than 2:12 slope; Exception: detached garages,
patios, carports, open on three sides with min. slope of
1:12
N/A
❑ Pass
❑ Fail
Modified Bitumen, EPDM, TPO min slope 1/4:12 slope
14 N/A
❑ Pass
❑ Fail
Above roof insulation R-25
M N/A
❑ Pass
❑ Fail
Below roof residential R-38
14N/A
❑ Pass
❑ Fail
Below roof commercial R-32
N/A
❑ Pass
❑ Fail
Modified Bitumen, EPDM, TPO min slope 1/4:12 slope
must be installed in accordance with the manufacturer's
specifications - Must have manufacturer's letter of
warranty with the address on the letter for final inspection
Metal Roof Shingles Requirements
❑ N/A
❑ Pass
❑ Fail
Metal roof shingles shall not be installed on slope less
3:12
❑ N/A
❑ Pass
❑ Fail
Metal valley flashing shall be the same material as roof
❑ N/A
❑ Pass
❑ Fail
Metal valley flashing shall extend a min of 8" from the
centerline with a min. of 3/4 " high splash diverter
rib built-in at the flow line with sections overlapping a
a min. of 4"
Tile Roofs Requirements
❑ N/A
❑ Pass
❑ Fail
Clay and concrete tile shall have a min. 2-1/2:12 slope
Slopes 4:12 and under require double underlayment
Company Name:
Inspector signature:
Date of Inspection:
The City of Wheat Ridge
Inspection Check List notes
Final Roof
Notes
Mark Benjamin PE
PHI -D&E Inc. dba
Crown Jade (com)
Design and Engineering
PO 17, Ft. Collins CO 80522
970-472-2394
D0 LIEF ; `I
�p�Pooseeaoa�U�.!
38300
S/ONRI,
The City of Wheat Ridge
v\ G ��'
Inspection Check List notes
Mid -Roof
Roof Inspection
❑ N/A
❑ Pass
❑ Fail
❑ N/A]
Pass
❑ Fail
Structural roof components
❑ N/A
Pass
❑ Fail
Verify that no more than 2 layers of shingles exist
❑ N/A
Pass
❑ Fail
Flashing for roof and walls
Pass
❑ Fail
If new sheathing is installed verify that it is listed in the
permit description (Valuation must be adjusted)
❑ N/A
Pass
❑ Fail
Verify sheathing nail pattern (See Policy & Procedures)
N/A
❑ Pass
❑ Fail
Crickets and saddles where needed
❑ N/A
Efl Pass
❑ Fail
Verify B vent must have boot same gauge as pipe
❑ N/A
f4 Pass
❑ Fail
Verify vent caps
❑ N/A
J Pass
❑ Fail
Verify no flashings are damaged or rusted
❑ N/A
Pass
❑ Fail
Step flashing shall be min. of 4x4 piece per shingle
N/A
Pass
❑ Fail
Verify scuppers allow for proper drainage
❑ N/A
Pass
❑ Fail
Ice and water shield Z in heated wall spaces
❑ N/A
Pass
❑ Fail
Underlayments must follow 2012 IRC / 2012 IBC
❑ N/A
Pass
❑ Fail
Verify roof slope for proper drainage
❑ N/A
Pass
❑ Fail
Dripedge shall have min of 2" overlap
❑ N/A
Pass
❑ Fail
Dripedge should extend down min 2" past roof deck
❑ N/A
bi Pass
❑ Fail
Dripedge shall be mechanicaly fastened 12" OC
N/A
❑ Pass
❑ Fail
90 LB roll roofing shall not be applied to roof slopes
less than 2:12 slope: Exception, detached garages,
patios, carports, open on three sides with min. slope of
1:12
N/A
❑ Pass
❑ Fail
Modified Bitumen, EPDM, TPO min slope 1/4:12 slope
N/A
❑ Pass
❑ Fail
Above roof insulation R-25
N/A
❑ Pass
❑ Fail
Below roof residential R-38
N/A
❑ Pass
❑ Fail
Below roof commercial R-32
N/A
❑ Pass
❑ Fail
Modified Bitumen, EPDM, TPO min slope 1/4:12 slope
must be installed in accordance with the manufacturers
specifications- Must have manufactures letter of
warranty with the address on the letter for final inspection
Metal Roof Shingles
Requirements
❑ N/A
❑ Pass
❑ Fail
Metal roof shingles shall not be installed on slope less
3:12
❑ N/A
❑ Pass
❑ Fail
Metal valley flashing shall be the same material as roof
❑ N/A
❑ Pass
❑ Fail
Metal valley flashing shall extend a min of 8" from the
centerline with a min. of 3/4 " high splash diverter
rib built-in at the flow line with sections overlapping a
a min. of 4"
Tile Roofs Requirements
❑ N/A
❑ Pass
❑ Fail
Clay and concrete tile shall have a min. 2-1/2:12 slope
Slopes 4:12 and under require double underlayment
The City of Wheat Ridge
Inspection Check List notes
Mid -Roof
Notes
Company Name:
Inspector signature:
Date of Inspection:
Mark Benjamin PE
PHI -DBE Inc. dba
Crown Jade (.com)
Design and Engineering
PO 17, Ft. Collins CO 80512
970-472-2394
w
41
CITY OF WHEAT RIDGE '
Building Inspection Divisio
/ (303) 234-5933 Inspection n
line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: G rc
Job Address:
Permit Number:
v �
l- /, /C- C_- S7�
Cfbahr\
�--N S 7 n -/
i ' DffZo , e
r
�� DrI� Zdh,JAl
f >J
IOP
S�Q; , 1) pR �f N1+[ 'a /1-0 A 1-0A
''N P'Pr
JA i I
,ONS
N 5 rp 7;7
Z.
2 i
❑ No one available for inspection: TimeZ._� A
Re -Inspection required: Yes /P
�No �f / ( f 6 Q i
When corrections havejV
been made, cal/ for_
re inspection at 30325933 t[
Date:
Inspector: F
F
DO NOT REMOVE TH/S NOT/C
E r
r t
City of Wheat Ridge
Residential Remodel PERMIT - 201700712
_� 9�
PERMIT NO: 201700712 ISSUED: 06/26/2017
JOB ADDRESS: 3829 Taft CT EXPIRES: 06/26/2018
JOB DESCRIPTION: Revision: Adding wet bar to scope of work
Basement finish - 900 sq ft; to include 1 bedroom, 1 bathroom, and 1 large
open rec room
***
CONTACTS ***
OWNER (303)931-2534
LUELLEN AMANDA
GC
(720)837-3365
Seth Deneen
150120
Right Angle Contracting
SUB
(720)495-2223
uPGRADE
160133
Upgrade Electrical Service LLC
SUB
(720)298-9492
Diana Havens/William Havens
160131
Freedom Plumbing Corp.
SUB
(720)296-7938
James E. Hegge Jr.
080145
C&H Heating and Cooling LLC
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 /
*** FEE SUMMARY ***
Total Valuation
Plan Review Fee
Use Tax
Permit Fee
** TOTAL **
*** COMMENTS ***
ESTIMATED PROJECT VALUATION
FEES
0.00
339.66
663.60
522.55
1,525.81
31,600.00
*** CONDITIONS ***
Approved per plans and red -line notes on plans. Must comply with 2012 IRC, 2014 NEC and all
applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections.
All roughs to be done at Framing Inspection.
- City of Wheat Ridge
Residential Remodel PERMIT - 201700712
PERMIT NO: 201700712 ISSUED: 06/26/2017
JOB ADDRESS: 3829 Taft CT EXPIRES: 06/26/2018
JOB DESCRIPTION: Revision: Adding wet bar to scope of work
Basement finish - 900 sq ft; to include 1 bedroom, 1 bathroom, and 1 large
open rec room
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable uilding codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the propend_am authorized to obtain this permit and perform the work described and approved in conjunction with
m
this erit. I furtheT a €'st tl�, am legally,,authorized to include all entities named within this document as parties to the work to be
performed d t t wor be pertorme E is disclosed in this document and/or its' accompanying approved plans and specifications.
Signa ure of OWNER or CONTRACTOR (Circle one) Date
I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This.permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4, No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any
applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
�- t
City of
Wh6at *
=°® COMMUNITy DEVELOPMENT
Building & Inspection Services Division
7500 W. 29th Ave., Wheat Ridge, CO 80033
Office: 303-235-2855 * Fax: 303-237-8929
Inspection Line: 303-234-5933
Email: perm its(a)ci.wheatridge.co.us
FOR OFFICE USE ONLY
Date:
Add to Permit #
_Z -01"1007t2,
C_ (:! '- - 0 - S -(, � _�
Building Permit Revision/Amendment Application
*** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. ***
Property Address:
Owner
Property Owner E
Mailing Address: (if different than property address)
Address:
City, State, Zip:
Contact Person:
Contractor:
Contractors City License #:
Contractor E-mail Address: X11
Phone:
ee
Phone: ` 7
Phone: ZPeP fT2 -
�s3Y
Please Note: Additional valuation Dust include all general and subcontracted work to be performed
related to the revisions and/or amendments declared in the description of work and which were not
included in the original permit valuation.
If revisions or amendments increase the original valuation, additional fees will be due at the time of
approval. Depending on the scope of work, additional plan review fees may be due upon approval
($60.00 an hour — 2 hour minimum).
Description of revised/amended work:
Sq. Ft./LF
Amps
Btu's
Squares
Gallons
Other
07/
Additional• Project Value: (Must include all general and subcontracted work to be performed related to revisions/amendments described above)
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or
regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are
accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance
with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner
or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any
entity included on this application to list that entity on this application.
CIRCLE ONE_ (OWNER)
ONTRACT
or (AUTHORIZED REPRESENTATIVE)
of (OWNER) (CONTRACTOR)
PRINT NAME: �54//jj(CC/%
SIGNATURE:
DATE:
DEPARTMENT USE ONLY
ZONING COMMMENTS:
Reviewer:.
BUILDING DEPARTMENT COMMENTS:
Reviewer:
PUBLIC WORKS COMMENTS:
Reviewer:
PROOF OF SUBMISSION FORMS
Fire Department ❑ Received ❑ Not Required
Water District ❑ Received ❑ Not Required
Sanitation District ❑ Received ❑ Not Required
OCCUPANCY CLASSIFICATION:
Building Division Valuation: $
LIVING AREA
4b' -T'
15'
1/2" 4 V-5 1/2" 5'-9" y 4,7 5--b-
Theater Area
Unfinished Storage
Open Rec. Room
ALPAC
SO
UP
ton.
28'
Amanda Luellen Bedroom
352q Taft Ct.
Wheat Ridge, GO 50033
bqO 5q. Ft. Finished Electical Flan
Produced By:
N G L E
in !,set
101-61,
46'-T' -
LIVING AREA
in
-
.6'.
_ Cil of
$ k.-- ,9 L!5 C-.9 .b--J5c6-,b L Y
��- u '`brl LL -,i WheatRU�
-- COMMUtJfTY DEVEIDI`MENT
—.b �, o .blc 9-,b Nb/5 g -,O l
ml
' 0 APPROVED
or Code Com l
iance +`fv !
*5 fxa
ate
O -- —
V id of rm Thr suonce of a permir or opprowl of plops speciricatrons
- campum6o sholJ of be e permit for, or on approval of, any violation to
:n of the prov,s ons of he building code or of any City ordinances. Permits
miry to gi out',,",J o to violate ojconcel the Provisions of the Btritding
II 0 3des or other o inonc i of the City shall not be valid.
a � _-
LU
� I
T
,
I �
�9LIS L i7 -.b � - n9L/LL G -.0L
— i f
n-
O
N
1'.
i
I I I
------ - ------ ..9 L /L 9- b L ---- — - - --- - — .b - -- -- ---- ,.9/L C-rZ l b - - — - .9 L/ L L Z -d- --�
I
N
) Li
!a ttS iL� U"
Q m to
F City of
Wheat Ridge
:o
v
----ZL ---- -
I � f
-- 4 —.SIL L -,Ll ,b ---,.9 Ll L Lis -,L —�!
0
I.
I
I
i
city or
Wheat Ridge
Building Divison,
City of Wheat Ridge
�A
Residential Remodel PERMIT - 201700712
PERMIT NO: 201700712 ISSUED: 06/26/2017
JOB ADDRESS: 3829 Taft CT EXPIRES: 06/26/2018
JOB DESCRIPTION: Basement finish - 900 sq ft; to include 1 bedroom, 1 bathroom, and 1 large
open rec room
***
CONTACTS ***
OWNER (303)931-2534
LUELLEN AMANDA
GC
(720)837-3365
Seth Deneen
150120
Right Angle Contracting
SUB
(720)495-2223
uPGRADE
160133
Upgrade Electrical Service LLC
SUB
(720)298-9492
Diana Havens/William Havens
160131
Freedom Plumbing Corp.
SUB
(720)296-7938
James E. Hegge Jr.
080145
C&H Heating and Cooling LLC
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 /
*** FEE SUMMARY ***
Total Valuation
Plan Review Fee
Use Tax
Permit Fee
** TOTAL **
*** COMMENTS ***
ESTIMATED PROJECT VALUATION:
FEES
0.00
332.18
558.00
511.05
1,401.23
31,000.00
*** CONDITIONS ***
Approved per plans and red -line notes on plans. Must comply with 2012 IRC, 2014 NEC and all
applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections.
All roughs to be done at Framing Inspection.
City of Wheat Ridge
Residential Remodel PERMIT - 201700712
PERMIT NO: 201700712 ISSUED: 06/26/2017
JOB ADDRESS: 3829 Taft CT EXPIRES: 06/26/2018
JOB DESCRIPTION: Basement finish - 900 sq ft; to include 1 bedroom, 1 bathroom, and 1 large
open rec room
I, by rn signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all� �a plicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal own of th5rop rtS ani authorized to obtain this permit and perform the work described and approved in conjunction with
pers ermrt. I fy�tt �t team legahy authorized to include ali entities named within this document as parties to the work to be
per ormed a t a or o e per o ed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signat re of OWNER or CONTRACTOR (Circle one) Date
I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made -be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If This permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Offial and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The pen -nit holder shall notify the Building and Inspection Services Division in accordance with established policy, of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any
applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection,
t..
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us
between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line.
City of
Wheat jige
COMMUNITY DEVELOPMENT
FOR OFFICE USE ONLY
Date: �/ I
Plan/Permit # 0"'U
Building & Inspection Services Division
7500 W. 29th Ave., Wheat Ridge, CO 80033 Plan Review Fee:j�+
Office: 303-235-2855 * Fax: 303-237-8929
Inspection Line: 303-234-5933
Email: permits na cimheatridae.co.us
Building Permit Application
*** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed.
Property Address:
Property Owner
Phone: SOS- /S/
7y
Property Owner Email:__/
Mailing Address: (if different than property address)
Address: 5�
City, State, Zi
Architect/Engineer:
Architect/Engineer E-mail: Phone:
Contractor: /ll /� /���ca/ / � /"'re/( -_
Contractors City License #: / Phone:_ 7�V 1.3-Z-5, 6 5 --
Contractor
Contractor E-mail Address:
Sub Contractors:
Electrical: `� j� HAY/C
f�i L
Plumbing: ,�����+N�
Mechanical: �l-� ��z��.�L�C�•
W.R. City License #
W.R. City License #
0
W.R. City License #
Other City Licensed Sub:
City License #
Other City Licensed Sub:
City License #
Complete all information on BOTH sides of this form
❑ COMMERCIAL P RESIDENTIAL
Description of work: (Check all that apply)
❑ NEW COMMERCIAL STRUCTURE ❑ ELECTRICAL SERVICE UPGRADE
❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING
❑ COMMERCIAL ADDITION ❑ RESIDENTIAL ROOFING
❑ RESDENTIAL ADDITION ❑ WINDOW REPLACEMENT
❑ COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT
❑ ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
E OTHER (Describe) 7- C,11 s A
(For ALL projects, please provide a detailed description of work to be performed, including current use of areas,
proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and
amount of materials to be used, etc.)
/J 7Zf'1'
Sq. Ft./LF
Amps
Btu's
Squares
Gallons
Other
Project Value: (Contract value or the cost of all materials and labor included in the entire project)
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or
regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are
accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance
with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner
or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any
entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the
truthfulness of the information provided on the application.
CIRCLE ONE. (OWNER) f<'ONTRACTOR1jor (AUTHO IZED R RESENTATIVE) of (OWNER) (CONTRACTOR)
Electronic Sianature (first and
ZONING COMMMENTS:
Reviewer:
BUILDING DEPARTMENT COMMENTS:
Reviewer:
DEPARTMENT USE ONLY
OCCUPANCY CLASSIFICATION:
Building Division Valuation: $
LL 4l G�0 G-tf7) SE C�o/�If
�v.
City ®f APPLY
Y
Wh6at iii:Ve
Commu1VITY DEVELOPMENT
City of Wheat Ridge Municipal Building 7500 W. 29' Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2855 F: 303.237.8929
Review is limited to the contents of the plans submitted and any errors or omissions contained herein shall not be
construed as permission to allow any conditions to exist in violation of the codes of the City of Wheat Ridge
3 Burial depth requirements:
Electrical - direct burial conductors shall be a minimum of 24 -inches deep, non-metallic conduit 18 -inches deep or 24 -
inches under driveways. (IRC Table E3803.1)
Water Lines - shall be a minimum of 36 -inches deep. (IRC P2603.6)
Gas Service Piping - installed a minimum of 12 -inches below grade or 8 -inches below grade where serving individual
outside appliances. An 18 AWG yellow insulated tracer wire must be installed adjacent to underground nonmetallic gas
piping and terminate above grade at each end. (IRC G2415.1.2 and G2415.17.3)
4 Underground plumbing pipe shall have a solid and continuous load-bearing support. Piping cannot bear on rocks. Pipes
passing under a footing or through foundation wall shall be provided with a relieving arch or a sleeve. Trenches parallel to
footing shall not extend below the 45° plane of the edge of the footing. Water piping must be buried a minimum 36 -
inches deep. Water service pipe may be installed in the same trench as the building sewer provided the sewer pipe
material is listed for underground use within the building or the water service pipe is separated from the sewer by a
minimum distance of 5 -feet horizontally or elevated at least 12 -inches above and to one side of the sewer line.
5 Frost depth to the bottom of the foundation footings must be as noted on the engineered plans. If not noted, the frost
depth to the bottom of the footings must be a minimum of 30 -inches below finished grade. (IRC TableR301.2.1)
6 Caisson and helical pier foundations will not be inspected by Boulder County. A qualified, Colorado -licensed engineer
must perform the placement, drilling, and reinforcement of drilled piers. A signed, sealed and dated inspection report
must be provided to Building Inspection Services prior to the rough inspections R110.5.2.3)
7 A perimeter drain system that discharges to an approved drainage system is required around all foundations that
enclose usable spaces below grade. Foundations that retain earth and enclose interior spaces below grade must be damp
proofed. (IRC R405.1, R406.1, BC Amendment R401.2.14)
8 Slabs below grade must maintain a minimum of 6 -inches above the design water table. The interior finished crawl
space grade must be a minimum of 36 -inches above the design water table. (BC Amendment R401.2.1.3and R401.2.1.5)
9 Garage floor surfaces must be approved noncombustible materials. Floors must be sloped to facilitate the movement
of liquids to a drain or toward the main vehicle entry doorway. (IRC R309.1)
10 Foundation plates and sills must be bolted to the foundation wall as prescribed on the engineered plans. If not noted,
bolts shall have a minimum diameter of %Z -inch, embedded at least 7 -inches and spaced not more than 6 -feet apart. A
minimum of 2 bolts are required per plate section, with one bolt located within 12 -inches of each end of each plate. (IRC
R403.1.6)
www.cl.wheatridge.co.us
Rough Framing and Wood Requirements
1 ) The complete rough inspection is to be made after the rough framing, rough electric, rough plumbing, and rough heat
and ventilation are complete. The building should be fully enclosed with the roof covering and siding in place.
12 protection from decay shall be provided in the following locations by the use of naturally durable wood or wood that
is preservative treated in accordance with AWPA U1: (IRC R317)
1.3 Lumber, plywood, fiberboard, structural logs, and glued laminated timber must be identified by a grade mark or
certificate of inspection issued by an approved agency. (IRC R502.1, R602.1, and R802.1)
A. Wood joists closer than 18 -inches and wood girders closer than 12 -inches to grade located within foundation
periphery.B. Wood framing members that rest on concrete or masonry foundation walls and are less than 8 -inches from
the exposed ground.
C. Sills and sleepers on a concrete or masonry slab that is in direct contact with the ground.
D. Wood girders entering concrete or masonry walls with a clearance less than %-inch.
E. Wood siding, sheathing, and wall framing less than 6 -inches above the ground.
F. Wood members supporting moisture -permeable floors or roofs that are exposed to the weather.
G. Wood furring strips or wood members attached directly to the interior of below grade exterior masonry or concrete
walls.
H. Wood in contact with the ground, embedded in concrete in direct contact with the ground or embedded in concrete
exposed to the weather that supports permanent structures intended for human occupancy shall be approved pressure -
preservative -treated wood.
13 Accessible under -floor areas shall be provided with a minimum 18 -inches x 24 -inches opening through the floor or 16 -
inches x 24 -inches opening through the perimeter wall. When the access is through a below -grade wall an areaway of not
less than 16 -inches x 24 -inches must be provided. Where equipment is located beneath the floor, the access opening
must be within 20 -feet of the equipment and allow the removal of the largest piece of equipment. (IRC R408.4 and
M1305.1.4)
1.4 Basements greater than 200 square feet and every sleeping room shall have at least one operable emergency and
rescue opening or a door to the exterior.
15 Emergency escape and rescue openings shall meet the following requirements: A minimum clear width of 20 -inches, a
minimum clear height of 24 -inches, with a total net clear opening of 5 square feet for grade level windows and 5.7 square
feet for all others. A sill height of not more than 44 inches measured from the finished floor to the bottom of the clear
opening. Window wells for emergency escape and rescue shall provide a minimum net area of 9 square feet with
minimum horizontal projection and width of 36 -inches. The area of the widow well shall allow the emergency escape and
rescue opening to fully open. (IRC R310)
1 6 Columns must be restrained to prevent lateral displacement at the bottom end to insure against uplift. (IRC R301.2.1,
8407.3)
17 Fire blocking shall be installed to cut off all concealed draft openings in the following locations: (IRC 302.11) A. In
concealed spaces of stud walls and partitions, including furred spaces, vertically at the ceiling and floor levels, and at 10 -
feet horizontal intervals.6. At interconnections between concealed vertical and horizontal spaces such as occur at soffits,
drop ceilings, and cove ceilings. ( In openings around vents, pipes, ducts, cable, wires, chimneys, fireplaces, and similar
openings that afford apassage for fire at ceiling and floor levels. D. In concealed spaces between stair stringers at the top
and bottom of the run, and between studs in line with the run of the stairs at unfinished walls.
18 At least one egress door shall be provided for each dwelling unit. The egress door shall be side -hinged, and
shall provide a minimum clear width of 32 -inches (813 -mm) when measured between the face of the door and
the stop, with the door open 90 degrees (1.57 rad). The minimum clear height of the door opening shall not be
less than 78 -inches (1981 -mm) in height measured from the top of the threshold to the bottom of the stop. Other
doors shall not be required to comply with these minimum dimensions. Egress doors shall be readily openable
from inside the dwelling without the use of a key or special knowledge or effort. (IRC R311, R311.2)
19 There shall be a floor or landing on each side of each exterior door, except where a stairway with 2 or fewer risers
located on the exterior side of the door, other than the required exit door, a landing is not required for the exterior
side of the door. The landing must be no lower than TY4-inches below the top of the threshold of the door
provided the door does not swing over the landing. (IRC R311)
20 Stairways must be at least 36 -inches in width. Handrails shall not project more than 4%: -inches. The maximum rise
may not exceed 7% -inches. The minimum tread depth may not be less than 10 -inches. Minimum headroom is 6 -feet, fl-
inches. For stairways with solid risers a nosing of %-inch to 1Y4 -inches shall be provided. When open risers are used the
opening between the treads shall not allow the passage of a 4 -inch sphere. Landings must be provided at the top and
bottom of the stairway that is the width of the stairway measuring at least 36 -inches in the direction of travel. Handrails
shall be provided on at least one side of stairways with 4 or more risers and ramps with a slope exceeding 1:12. Handrails
shall be mounted 34 -inches to 38 -inches above the nosing of the treads. Handrails must be continuous for the entire
length of the stairs and provided with a minimum space of 1%: -inch between the wall and the handrail. Ends shall be
returned or terminate in newel posts or safety terminals. See the requirements and more information. (IRC R311.7.8)
21 Handrail Grip Size Shall Be:A. Circular Handrails: 1% -inch to 2 -inches perimeter. B. Non -Circular: 4 -inches to 6% -inches
perimeter with a maximum cross section of 2Y4 -inches. C Perimeter Dimension Greater than 6% -inches: shall have a finger
recess on both sides.
22 Guards must be provided for porches, screened porches, balconies, fixed seating and raised floor surfaces more than
30 -inches above the floor or grade below. Guards must have a minimum height of 36 -inches. Open sides of stairs with a
total rise of more than 30 -inches above the floor or grade below shall have guards not less than 34 -inches high.
Intermediate rails shall not allow the passage of a 4 -inch sphere. (11312) Window fall protection must be provided for
window openings less than 24 inches above the finished floor and more than 72 inches above grade or surface
below. (8312.2)
23 Ceiling heights for habitable rooms, hallways, bathrooms, toilet rooms, laundry rooms, and basements shall be a
minimum of 7 -feet measured from the finished floor to the lowest projection of the ceiling. Non -habitable basements
may have a ceiling height of 6 -feet, 8 -inches with clearance below beams and ducts of 6 -feet, 4 -inches. Bathroom may
have a ceiling height of 6 -feet, 8 -inches at the fixture front clearance area and over the fixture. (IRC 8305.1)
24 Attic access must be provided for attics that exceed 30 square feet and that have a vertical height of 30 -inches or
greater. The access must be located in a hall or readily accessible location with a minimum 22 -inches x 30 -inches access
opening. The access must provide a minimum of 30 -inches headroom. (IRC 8807) 4 Form: B/24 a Rev.
25- Enclosed attic and rafter spaces must have cross ventilation for each space through screened openings. The total net
free ventilating area shall not be less than 1 to 150 of the area of the space ventilated. The area may be reduced to 1 to
300 if 50-80% is provided by ventilators located in the upper portion of the space or if a vapor barrier not exceeding 1
perm is installed on the warm side of the ceiling. At least a 1 -inch space is required between the roof sheathing and the
insulation at the location of the vent. (IRC R806)
�k6 Rafters must be framed to a minimum 1 -inch nominal ridge board that is not less than the depth of the cut end of the
rafter or to each other using a gusset plate. Hip, and valley rafters shall be a minimum of 2 -inches and not less in depth
than the cut end of the rafter. Hip and valley rafter shall be supported at the ridge by a brace to a bearing partition or be
designed. (IRC R802.3)
27 Rafters and ceiling joists having a depth -to -thickness ratio exceeding 5:1 shall be provided with lateral support at
points of bearing to prevent rotation. Rafters and ceiling joists having a depth -to -thickness ration exceeding 6:1 shall be
supported laterally by solid blocking, diagonal bridging or a continuous 1 -inch by 3 -inch wood strip nailed across the
rafters. (IRC R802.8) Roof trusses or rafters must be attached to supporting walls with approved hurricane clips. Trusses
must be braced to prevent rotation and to provide lateral stability in accordance with the construction documents and
the individual truss design drawings. (IRC R502.11.2, R802.11)
28 Trusses must be designed and fabricated in accordance with ANSI/TPI 1. A licensed professional shall prepare the
truss design. Trusses must be legibly marked within 2 -feet of the center to identify the manufacturer, the design load, and
the spacing. Truss engineering and layout must be provided at the site at the rough framing inspection. (IRC R502.11 and
R802.10)
29 Roofing material installed in the mountain areas is limited to Class -"A" roof coverings. Wood roofs in the plain areas
are limited to minimum Class "B" roof coverings. Shingle installation shall meet the manufacturer's high -wind installation
procedures in areas where wind load is greater than 105 mph (V3S). Chapter 9, R301.2.1, R325, and manufacturer's
listing
30 All habitable rooms shall be provided with aggregate glazing area for natural light of not less than 8% of the floor area
of such rooms. The glazed areas need not be installed in rooms where section M1507 is satisfied and artificial light is
provided at an average of 6 foot candles at a height of 30 inches.
31 Safety glazing shall be installed in the following hazardous locations and be permanently labeled as safety or
tempered glazing: glazing panels in doors; glazing enclosing spas, bathtubs or showers; glazing panels adjacent and within
24 -inches of the edge of a door; glazing panels greater than 9 square feet within 18 -inches of the floor; glazing used for
railings; glazing used for barriers for swimming pools and spas; and glazing enclosing stairways, landings, and ramps
within 36 -inches horizontally of a walking surface. See the Boulder County Land (IRC R308)
32 Roofs decks and enclosed roofed areas must be provided with roof drains installed at the low point of each roof.
Where roof drains are installed, overflow drains or scuppers are required. (IRC R903.4)
33 Exterior finish materials must conform to the conditions of your Site Plan Review to include: roof covering, siding,
color requirements, conforming light fixtures which comply with the approved lighting plan. Glazing and Window
Requirements
3.2 Skylights must be: (IRC R308.6 Table N1102.1)
A. laminated glass (with restrictions).
B. fully tempered glass (with retaining screen).
C. heat -strengthened glass (with retaining screen).
D. wired glass (with retaining screen in multiple glazing condition only).
E. approved rigid plastic.
F. Skylight U -factor required U-0.45.
Skylights installed on roofs flatter than 3 units vertical to 12 units horizontal must be mounted on a curb
4 -inches above the roof.
Pleating and Ventilation Requirements
33 Crawl spaces shall be provided with conditioned air in compliance with Section N1102.2.9. Crawl space walls shall be
insulated in accordance with Table N1102.1 or Table N 1102.1.2. Crawl space wall insulation shall be permanently
fastened to the wall and extend downward from the floor to the finish grade level and then vertically and/or horizontally
for a least an additional 24 -inches. Exposed earth in unvented crawl space foundations shall be covered with a continuous
Class I vapor retarder with a minimum thickness of 10 -mil. All joints of the vapor retarder shall overlap by 6 -inches and be
sealed and taped. The edges of the vapor retarder shall extend at least 6 -inches up the stem wall and shall be attached to
the stem wall. N1102.2.9.2.2 Ventilated crawlspaces. Ventilated crawlspaces shall be provided with insulation in
accordance with Table N1102.1.
34 A Habitable rooms must be provided with outdoor openings for ventilation equal to at least 4% of the floor area and
shall have heating facilities capable of maintaining 68° at 3 -feet above the floor and 2 -feet from exterior walls. B. The
windows need not be openable in a room where an opening is not required to be an egress window and a mechanical
ventilation system is capable of producing 0.35 air change per hour in that room, or a whole house mechanical ventilation
system provides 15 cubic feet of outdoor air per minute.
35 Bathroom exhaust fans shall exhaust directly to the exterior and must be provided in bathrooms where windows of at
least 3 square feet are not provided. The mechanical ventilation must be capable of providing an exhaust capacity of 50
cfm intermittent or 20 cfm continuous exhaust. (IRC R303.3, M1507.4)
36 Dryer vents must be rigid metallic, independent of all other systems, shall terminate outside the building, be equipped
with a back draft damper, and sized and terminated per the manufacturer. The maximum length of the exhaust duct shall
be 35 -feet (Unless approved under the manufacturer's listing) from the connection to the transition duct from the dryer
to the outlet terminal. Where fittings are used, the maximum length of the exhaust duct shall be reduced in accordance
with (IRC Table M1502.4.4.1) Flexible transition ducts are limited to 8 -feet, shall not be concealed within construction,
and shall be listed and listed per UL 2158A. (IRC M1502)
37 Appliances and equipment shall be installed in accordance with the conditions of their listing. Manufacturer's
installation instructions must be available at the time of the inspection. (IRC G2408.1, M1307.1, M1401.1,(M1902.2)
38 Appliances shall be accessible for inspection, service, repair and replacement without removing permanent
construction. 30 -inches of working depth and width shall be provided in front of the control side of an appliance. (IRC
M1305.1)
39 Gas and solid fuel appliances located in a garage and hazardous locations shall be elevated so the source of ignition is
at least 18 -inches above the floor. Rooms and spaces that are communicate directly with the garage and are not part of
the living space shall be considered as part of the garage. Appliances located in garages must be installed at least 6 -feet
above the floor or protected from motor vehicle impact. (IRC G2408.2, G2408.3)
40 Combustion air is required for all liquid fuel, solid fuel and gas appliances. (IRC M1701.1, G2407)
4" Gas burning appliances may not be located in or obtain combustion air from: a sleeping room, bathroom, toilet room,
or storage closet unless it is a direct vent appliance or installed in an enclosure that opens only into a bedroom or
bathroom in and such enclosure is provided with a solid weather-stripped door, a self-closing device and all combustion
air is taken from the outdoors. (IRC G2406.2)
42 Gas logs installed in solid fuel burning fireplaces shall be tested in accordance with ANSI 221.60 and installed per the
manufacturers installation instructions. Gas logs installed in bedrooms must be direct vent or provided with an approved
source of outside combustion air. The approved gas log set must be installed in the Solid -fuel burning appliances at the
final inspection. (IRC G2406, G2432, and G2434)
43 B, BW, and L vents and factory -built chimneys must be provided with a clearance to combustibles per them a
manufacturer's listing. Where vents pass through insulated assemblies, they must be provided with an insulation shield. A
clearance of 9 -inches is required between single wall vent connectors and combustibles. Gas vents must penetrate
through the roof flashing, jack or thimble and terminate in a Chimneys listed cap or per the manufacturers listing.
Decorative shrouds installed at terminations shall be listed and installed per the manufacturer. (IRC G2425, G2426,
G2427)
Electrical Requirements
44 All electrodes present at each structure shall be bonded together to form one grounding electrode system to include:
Concrete Encased Electrodes (UFER), water piping, ground rings, grounding rods, and plate electrodes. Bonding shall
ensure electrical continuity. The electrode conductor must be connected in an approved manner and inspected prior to
concealing. (IRC E3607, E3608, E3609, E3610, E3611)
45 All hot, neutral, and grounding conductors in electrical boxes shall be tied together with a mechanical connection at
the time of rough inspection.
46 Recessed lighting fixtures must either be IC -rated or installed in a sealed box in which the insulation is at
least 3 -inches from the light fixture. All recessed lights must be tightly sealed or gasketed to prevent air leakage
through the fixture into the ceiling cavity. (IRC N 1102.4.5)
47Tamper -resistant Receptacle outlets are required in every kitchen, family room, dining room, living room, parlor,
library, den, sunroom, bedroom, recreation room or similar dwelling areas spaced so that no point along the wall line
exceeds 6 -feet from an outlet. (IRC E3901, E3902, and 4002.1-4002.14)A Counters 12 -inches in width or wider shall have
receptacles placed no more than 20 -inches above the counter top and spaced so no point exceeds 24 -inches from an
outlet. 8 Island and peninsula counters with a length at least 24 -inches and a width of 12 -inches or greater must be
equipped with at least one outlet. C. At least one receptacle shall be installed in a bathroom within 36 -inches of each
basin. D. A least one receptacle outlet must be installed in each laundry, basement, attached garage and detached garage
with power. E. At least one receptacle outlet that is accessible while standing at grade level and located not more than6-
feet, 6 -inches (1981 -mm) above grade, shall be installed outdoors at the front and back of each dwelling unit having
direct access to grade. Balconies, decks, and porches that are accessible from inside of the dwelling unit and that have a
usable area of 20 square feet. F. Attics or crawlspaces containing equipment must be provided with at least one
receptacle outlet within25-feet of the equipment. G. Hallways 10 -feet or more in length.
4P Two 20 -amp rated branch circuits shall serve receptacles in the kitchen, pantry, breakfast area, and dining area. At
least one 20 -amp branch circuit shall supply bathroom receptacles and at least one 20 -amp branch circuit shall supply
laundry. (IRC E3703.2, E3703.3, E3901)
SIP Ground fault protection shall be provided on all 125 -volt, single phase, 15 and 20 -amp receptacles in the following
locations: bathrooms, garages, unfinished grade level accessory buildings, at exterior locations, crawlspaces, unfinished
basements, kitchen counters, within 6ft. of laundry, utility and wet bar sinks, boathouses, hydro massage, spa and hot tub
locations. Receptacles must be in a readily accessible location. (IRCE3902, E3902.11)
51 Combination type arc -fault circuit interrupters must be installed on all 120 -volt 15 and 20 -amp branch circuit outlets
in Receptacle outlets are required in every family room, dining room, living room, parlor, library, den, sunroom, bedroom,
recreation room, hallway, closets, and similar dwelling areas. (IRC 3902.12)
52 At least one wall switch -controlled lighting outlet shall be installed in every habitable room, bathroom, hallway, (10ft)
stairway, attached garage, detached garage with electric power, and at the exterior side of each outdoor egress door
having grade level access. Attics, under floor spaces, utility rooms and basements containing equipment or used for
storage must be provided with a switch
Sa Smoke alarms shall comply with UL 217. Smoke alarms are to be powered by the building's wiring operated light. (IRC
E3903)with battery backup and shall be interconnected so the actuation of one alarm will activate all alarms in the
dwelling unit. Smoke alarms shall be installed in the following locations: (IRC R314) A. In each sleeping room; B Outside
each sleeping area in the immediate vicinity of the bedrooms; and C One on each additional story including basements.
54 Carbon Monoxide alarms are required in a single-family dwelling that has fuel -fired appliance(s), or a fireplace, or an
attached garage. The alarm must be installed within 15 -feet of the entrance to each sleeping room. Must be listed by a
nationally recognized, independent lab. Plugs into a dwelling's electrical outlet and has a battery backup. They may be
combined with a smoke -detecting device if the combined device complies with applicable law. (IRC R315)
55 Clothes closet lighting shall be limited to surface -mounted or recessed incandescent fixtures with completely enclosed
lamps, and surface -mounted or recessed fluorescent fixtures.Surface mounted fixtures shall be installed on the wall
above the door or on the ceiling with the following clearances between the fixture and the nearest point of a storage
space: (IRC E4003.12)A. Incandescent fixtures or LED shall have a minimum 12 -inch clearance. B. Fluorescent fixtures shall
have minimum 6 -inch clearance. Recessed fixtures shall be installed in the wall or ceiling with the following clearances: A
Recessed incandescent fixtures shall have a minimum 6 -inch clearance to the nearest point of storage. B. Recessed
fluorescent fixtures shall have a minimum 6 -inch clearance to the nearest point of storage.
56 Working space must be provided around energized equipment for servicing and maintenance. The minimum
dimensions shall not be less than 36 -inches in depth and 30 -inches in width in front of the equipment. Working space
shall extend to at least 6 -feet, 6 -inches above the floor. (IRC E3405.2)
57 Electrical fixtures installed in wet or damp locations shall be installed so that water cannot enter or accumulate n
wiring compartments or other electrical parts. Fixtures installed in wet locations must be labeled "suitable for wet
locations". Fixtures installed in damp locations must be labeled "suitable for damp locations" or "suitable for wet
locations". Switches or circuit breakers located in wet locations or outdoors must be enclosed in a weatherproof
enclosure. Outdoor receptacles must have a weatherproof enclosure and an in -use cover. Cord -connected fixtures,
hanging fixtures, track lighting, pendants, and ceiling fans shall not be located within3-feet horizontally and 8 -feet
vertically from the top of a tub or shower rim. (IRC E4003.9, E4002.8, E4002.9,E4002.10, E4003.9, E4003.10,E4003.11)
Plumbing Requirements
5t' DWV systems shall be tested on compellation of the rough piping installation by water or for piping system
other than plastic by air with no evidence of leakage. Either test shall be applied to the drainage system in its
entirety or in sections after rough piping has been installed .1) Water test 10 feet above the highest fitting
connection or to the highest point of the completed system. The system shall prove leak free for 15 minutes.
2) Air test shall maintain 51hs of pressure for 15 minutes.
59 Piping must be inspected and tested prior to concealing. It shall be protected against physical damage and it must be
approved for use and bear the identification of the manufacturer. (IRC P2503, P2603, P2608.1)
60 Bathtubs, walls above bathtubs with shower heads, shower floors, and shower compartments shall be finished with a
non-absorbent surface which extends to a height not less than 6' above the floor. Showers must have a minimum 900
square inches of interior area and a minimum dimension in each direction of 30 -inches. Shower valves must be pressure
balance/thermostatic mixing valves. Shower receptors shall have a curb threshold not less than 1 -inch below the sides
and back of the receptor. The curb shall measure a minimum of 2 -inches to a maximum of 9 -inches above the top of the
drain. (IRC R307, P2708, P2709)
6:t The centerline of toilets or bidets shall not be less than 15 -inches from adjacent walls or tub. Toilets, bidets, and
lavatories must have a minimum clear space of 21 -inches in front of the fixture. Lavatories require a 4 -inch clearance to
wall or to a toilet. (IRC P2705)
6� Showers and tub/shower combinations shall have control valves of the pressure balance, thermostatic mixing or
combination pressure balance/thermostatic mixing valve types with high limit stop per ASSE 1016 or CSA6125.1. Tubs
shall also have a control valve as listed for a shower or a water -temperature -limiting device that conforms to ASSE 1070.
The high limit stop for a device shall be set to a maximum of 120`. (IRC P2708.3,P2713.3)
63 Shower doors shall have safety glazing; hinged show door shall open outward. (R308.4.5, P2708.1)
64 Backflow prevention must be provided to prevent contamination of potable water. This includes but is not limited to:
hose connections, irrigation systems, boilers, solar systems, fire sprinklers, and dishwashers. (IRCP2902.2, Table P2902.3,
P2717)
Insulation
65 R-20 Walls
R-49 Ceiling
R-19 Crawlspace
Window U -Factor .32
Floor R-30
66 Supply Ducts in attics shall be insulated to a minimum of R-8. All other ducts shall be insulated to minimum
R-6. ( N 1103.2. 1)
6� Combustible insulation shall be separated a minimum of 3 -inches from fan motors and heat -producing devices.
Insulation shields must be provided where vents pass thorough insulated assemblies and must terminate at least 2 -inches
above attic insulation materials. Can lights must be airtight if located in the building envelope. (G2426.4)
Class I or II vapor retarders are required on the interior side of the insulation in framed walls, floors and roof/ceilings of
the building's thermal envelope. The vapor barrier is not required in construction where moisture or freezing will not
damage the materials, or where the framed cavity (or space) is ventilated to allow moisture to escape. A vapor retarder is
not recommended on a concrete basement foundation wall or in a shower /bath compartment (IRC 702.7, R702.7.1).
Wallboard Requirements
6P The garage shall be separated from the residence and its attic by materials of not less than %:-inch gypsum board
applied to the garage side. Garages beneath habitable rooms shall be separated from all habitable rooms above by not
less than 5 8 -inch Type X gypsum board. Where the separation is a floor -ceiling assembly, the structure supporting the
separation shall also be protected by not less than %-inch gypsum board. (IRC R302.6) Openings between the garage and
residence shall be equipped with solid wood doors not less than 1 -inch in thickness, solid or honeycomb core steel doors
not less than 1 -inch thick, or 20 -minute fire -rated doors. Openings are prohibited between garages and rooms used for
sleeping. (R302.5.1 )Doors between attached garages and living space shall be weather stripped to the degree necessary
to make them airtight and shall be self-closing and self -latching.
6SS Enclosed accessible space under stairs shall have walls, under stair surface and any soffits protected on the enclosed
side with''/: -inch gypsum board (IRC R302.7).
70 Cement, fiber -cement, glass mat gypsum backer and fiber reinforced gypsum in compliance with ASTM C
1288, C 1325, Cl 178, or Cl 178 and installed in accordance with manufacturer recommendations shall be used as
backers for wall tile in tub and shower areas and wall panels in shower areas. (IRC R702.4.2)
71 )Mail spacing for gypsum board % gypum board Ceiling 16oc, 7", nails 12", Type S screws '/2 wall spacing
24"OC, 8" nailspacing. 12"OCscrews. 5/8 ceiling board 16"OC, 7"nails 12"spacing, screws 240C 8".
72 Water-resistant gypsum backing board used as the base or backer for adhesive application of ceramic tile or other
required nonabsorbent finish material shall conform to ASTM C1396, C1178 or C1278. It is permitted on ceilings where
framing spacing does not exceed 12 -inches o.c. for %:-inch thick or 16 -inches o.c. for 5 8 -inch thick gypsum board. Water-
resistant gypsum board shall not be installed over a vapor retarder in a shower or tub compartment and may not be used
where there will be direct exposure to water, or in areas of continuous high humidity. All cut and exposed edges shall be
sealed. (IRC R702.3.8)
73 Floor assemblies, not required elsewhere in this code to be fire resistance rated, shall be provided with a % inch
gypsum wall board membrane, 5/8 inch wood structural panel membrane, or equivalent on the underside of the floor
framing member.(IRC 501.3)
Final Inspection Requirements
?4 Buildings shall have approved address numbers, building numbers or approved building identification placed in a
position that is plainly legible and visible from the street or road fronting the property. (IRC 319)
75 All dwellings shall have a controlled method of water dispersal from roofs that will collect and discharge all roof
drainage at least 5 -feet from the foundation. Gutters, downspouts, downspout extensions shall be deemed adequate to
meet these requirements. Surface drainage shall be diverted to a storm sewer conveyance or other approved point of
collection so as to not create a hazard. Lots shall be graded so as to drain surface water away from foundation walls. The
grade away from foundation walls shall fall a minimum of 6 -inches within the first 10 -feet. (IRC R401.3 and R801.3)
Swimming pools, fountains, hot tubs, spas, and hydro -massage "Jacuzzi" tubs and similar installations shall comply with
all provisions of the IRC for the approval of bonding equipment and lighting. All 15 and 20 amp, single-phase 125 -volt
receptacles located within 20 -feet of the inside walls of pools, outdoor spas and hot tubs shall be protected by a GFCI.
Motors and equipment must be accessible without damaging the building structure or building finish. (IRC E4202,E4203,
EE4204, E4205, E4206)
The reinforcing shell of the pool shell, metal forming shells, coping stones, deck, brackets of niche fixtures, metal fittings,
and electrical equipment, located less than 5 -feet horizontally and less than 12 -feet above maximum water level of
swimming pools and built in place hot tubs shall be bonded together. The parts specified above shall be connected to an
equipotential bonding grid. (IRC E4204.2)
in
Z -1K
.9 ML 9 b L
ZL
ZJL L -.b
C13
City of
PQ
__@ge
0
_VKWh&L
CADUMUNM Dr4BMrMWSr
APPROVED
0
U
Reviewed for Code Con mom
r-4
4-:
-K5
W
Ldv bt
m
K d3
-6j-lq
IPlans I er Date
TAtqLqdj!l,,mK The sseance vfoPc~ 0f0AQf0v4#GfPbn% 3PCOKat'ans
WWapwputvf,o.s shoil not be a PCM410f, Or 00 dWQWvj, onyvialationto
&W 01 qw provisions o1 the builchng code oral oWCitycedirtances. Permits
�
pMuff#hV to give authority 10 vpokre 0jcgKd Me pmvislam of the SuA&V
cad -s oro0crordinoncesof ft City sWfW brvalid
ka
In
0
;13
LL
LUtm
CL
in
Z -1K
.9 ML 9 b L
ZL
ZJL L -.b
J-
-qIL r -Z L t, AM L C IL
.Li7
ALL WO(Z)Z SHAU— (�MOPUV
I TN Z 0) 7 12C t ZO) LI
W14CA-T- (Z10�E AC)M&JDMCVT
C13
City of
PQ
__@ge
0
_VKWh&L
CADUMUNM Dr4BMrMWSr
APPROVED
0
U
Reviewed for Code Con mom
r-4
4-:
-K5
W
Ldv bt
m
K d3
-6j-lq
IPlans I er Date
TAtqLqdj!l,,mK The sseance vfoPc~ 0f0AQf0v4#GfPbn% 3PCOKat'ans
WWapwputvf,o.s shoil not be a PCM410f, Or 00 dWQWvj, onyvialationto
&W 01 qw provisions o1 the builchng code oral oWCitycedirtances. Permits
�
pMuff#hV to give authority 10 vpokre 0jcgKd Me pmvislam of the SuA&V
cad -s oro0crordinoncesof ft City sWfW brvalid
J-
-qIL r -Z L t, AM L C IL
.Li7
ALL WO(Z)Z SHAU— (�MOPUV
I TN Z 0) 7 12C t ZO) LI
W14CA-T- (Z10�E AC)M&JDMCVT
Ower
Meat pidgo
<
z
-A
cn Im
LLJ
0
0 mn
4-:
-K5
W
<
m
K d3
Old"
Ower
Meat pidgo
<
z
-A
I
fn
..... - ----- ---1.9 LA L C-1
cft
Wheat Ridge
,Building Divison
LU
tY
V-
z
cft
Wheat Ridge
,Building Divison
City of Wheat Ridge
Residential Roofing PERMIT - 201704628
�s
PERMIT NO: 201704628 ISSUED: 07/24/2017
JOB ADDRESS: 3829 Taft CT EXPIRES: 07/24/2018
JOB DESCRIPTION: Residential Re -roof to install Owens Corning asphalt shingles with ROOF
DECKING - 41 sq.
*** CONTACTS ***
OWNER (303)931-2534 LUELLEN AMANDA
SUB (303)981-1265 Jon Lowrie 100243 Monarch Construction & Roofing
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 /
*** FEE SUMMARY ***
ESTIMATED
PROJECT VALUATION: 24,300.00
FEES
Total Valuation
0.00
Use Tax
510.30
PAID
Permit Fee
442.05
** TOTAL **
952.35
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) requires an approved inspection
prior to installation of ANY roof coverings and is require on the entire roof when spaced
or board sheathing with ANY gap exceeding one half inch exists. Asphalt shingles are
required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and
water shield is required. Eave and rake metal is required. A ladder extending 3 feet above
the roof eave and secured in place is required to be provided for all roof inspections.
Roof ventilation is required to comply with applicable codes and/or manufacturer
installation instructions, whichever is more stringent. In order to pass a final inspection
of elastomeric or similar type roof coverings, a letter of inspection and approval from the
manufacturer technical representative stating that "the application of the roof at (project
address) has been applied in accordance with the installation instruction for (roof
material brand name) roof covering" is required to be on site at the time of final
inspection.
Roof inspections for ROOFS OVER .6/12 PITCH: 3rd party inspection will be required, the 3rd
party inspection report will be collected at final roof inspection performed by City of
Wheat Ridge. If report is not available the final inspection will not be completed.
� 4 ® City of Wheat Ridge
Residential Roofing PERMIT - 201704628
PERMIT NO: 201704628 ISSUED: 07/24/2017
JOB ADDRESS: 3829 Taft CT EXPIRES: 07/24/2018
JOB DESCRIPTION: Residential Re -roof to install Owens Corning asphalt shingles with ROOF
DECKING - 41 sq.
I, by my signature, do heattest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be
performed and that ail-ryork to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
2G—
Signature of R or CONTRACTOR (Circle one) Date
1, This permit was issued based on the information provided in thepermit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, po Flans
and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and maybe subject to a fee equal to one-half of the originalpermitfee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections a not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance ermi"Roh
nstrued to be a permit for, or an approval of, any violation of any provision of any
applicable code mance or ris jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
lop 1% of roofing contractors
'
RFW W l "129
-00
Mll
,hvj()NA,K I
J� G.
415
-"R-
ase,
2-OLI
-7'
Art. Phom
"A'!c., 4
Cortsurix on MuAr," W)wch nrr"I any part of %x)pe cl wom Mat i0approved Lly thaosuran.,4 oompany llflietS Y43,; 01 ilm V,
tae rj.ij a:Rj'tKiiias work
T -e-
6 Of one layer ivxA 111,4,o sll.7;oo�
V 4Nae4s Oi Gs� &e iaitch stvat,,Ul b , pp�,
liwall NOW Urlde' llayrleaL
451b, 30lb t
111k0-ldle Brow Chartz-A ;Qraj 'rkrle Thar
iMlAs
NiAlbe ccs rd with ice, & hot rat liokl Vwieyll
wim, Apq-"e
in be8 Hillh-Protilia and C_ior-owdiww with qhi,)ql,4
V�Psfal; new pipe;ac KS
y"'Rerliaciit vents as needed
I�Rfl lashychiln;'s} wd a!; wal'ibuirrivt asiftIcd l
1191-a!'PidqaVont LF
ice &'VVztp: shield par code, as well as j;I vents and skylights
1y insia!l 4-6 nails per shingle ascq,iired by cily!coilrliry codas
,,A6,5qe,' Disn All Onierri i,exh C-UsIc'tier 1,10 need ro aunts the pro db to fe-b!qn dlt. afoa, or jir-stal;a
X- F'I Inspections will be corniateted as cityleountios shovirs, t have reatil the back of contract # 23 !nt,,
wa-'rant", cn, ,wfing, A rAhcr Wnstrucluorn tractc-s vol fceiVe a 1 w wo:k"nanship warranty
Sri Ii- MICIC c4ftnls Coming Platinum GAF
�PA-11-- m4iwic svre--p 4Y Inveway nd yard frer rernov,,,f ol my ti�la,
'
trash aadl aebr, tio
0
5-inc 6-'n- Cuk'y
I ,, i but,
Replace fti"; YPC
P Inv �,?s " No flf Vaq cQiijoete tha third, pet0v auallcri.-alil.ln fqml) Int.
sp—�W Instructions x�e?!!�!4Lrr�
ua-
ax"! af 'fle, serv�,�� L�,q qarqnc� �rotzi at ti �- �zK
��re�,e CDWT4:`l� ISI-- af�T�
"'Uparro.Vill tl*, sc,>pj �;f w-,fk �_Vwcd Ly 1, e ilx
-
reams in Cern s `'Exna - NI 0f this contract. rhe Arial swPin aco W U7,11' tr- :),n ,.)
insurj,,oa appicrie, scope Cuatotrer VAR kA responsible 0 pay for any'lPgrailes; dedlictible, 6ap'.,�ton of addai,)r'a, W'M auiiworizeu
the insuraficetorijilany determines Is not covered Vilftin I* scope of colverip Prowwoo by yov insui ance poliq—
Applexitnaw Dattis, of Service. the..- eojrA f we�.e ji,e solitoo tc- chanili& doo LO umlil"Jal 6VISY9 I km�
majenjos, payinam �Iefzye. insurance approval,,- ordiliaiy weed -W idM-Y-, -1 by -`Y other "Yolid 'eawnew Collull of Monarrh Mona"4:h will oi,C-,OV-z
commume4flon to customer to O.VA - is,
Notice: ale property owflar pun,
to LrAI Proceeds Of 6 PiDPOAY arlJ Des ra„¢i polus Lued puizoisof tD Pal Rfluda Flt c
s� run Naive. inDate, w pro"ris, to Paii, waive, or ret le all or Part of any m -sura' J�X �jL�je
-22-105, Ing rooft ant err Cann'tit pai,
0aY,Y*nt o"I ito C'werp(il residentai pTomrty
hke, heffhy au hone & lrq',Uct the wtaularlm- ccrlpaY & lwl, ty",W44re Lo mc!ijdx ttsnxlx-,. -)T 4 RoWtnnj I LC as 10:,A ',-F 0
ale, twlays ;Yate e3 'Pjca%,, ahx)ve 1 ,Wej auti)ame auf 1%,al rsfxesentaiiVi; XAV 74600 0! talar %-1 rJ7i35,rurifD9 tn olmalii Ie)i. ,11) tC
'(*je') further autwzefloliafth to Pok lip in tv,501ar” loe3.oolm mmacks On n0l,ilf afla tiellallf cit i'"I"It,
q,
Motixurt R ,er-
Dan Schultz
From: no-reply@ci.wheatridge.co.us
Sent: Thursday, July 13, 2017 4:2S PM
To: Permits CommDev
Subject: Online Form Submittal: Residential Roofing Permit Application
Categories: Gina
Residential Roofing Permit Application
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
your contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a
residential roof?
How many dwelling units
are on the property?
Yes
Single Family Home
PROPERTY INFORMATION
Property Address
Property Owner Name
Property Owner Phone
Number
Property Owner Email
Address
3829 taft ct
amanda luellen
3039312534
Field not completed.
L/�C F,�.�. 6/2711:�L
Do you have a signed Yes
contract to reroof this
property?
It will need to be
provided at the time of
permit pick-up.
CONTRACTOR INFORMATION
Contractor Name
Contractor's License
Number (for the City of
Wheat Ridge)
Contractor Phone
Number
monarch construction
100243
3039811265
Contractor Email Address blowrie@monarchroofs.com
Retype Contractor Email blowrie@monarchroofs.com
Address
DESCRIPTION OF WORK
Are you re -decking the Yes
roof?
Description of Roofing owens corning
Material
Select Type of Material: Asphalt
If "Other" is selected Field not completed.
above, describe here:
How many squares of the 41
material selected above?
Does any portion of the
property include a flat
roof?
If yes, how many squares
on the flat roof?
No I/
Field not completed.
TOTAL SQUARES of all 41
roofing material for this
project
Provide additional detail house
here on the description of
i
work. (Is this for a house
or garage? What is the
roof pitch? Etc)
Project Value (contract 24300
value or cost of ALL
materials and labor)
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this Yes
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
Name of Applicant brie lowrie
Email not displaying correctly? View it in your browser.
3
A i CITY OF WHEAT RIDGE
_1�9rBuilding Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: P+) C—
Job Address: 4 S$2 q -7410,7 C 7
Permit Number: 201700711-
Ll
0170071Z
❑ No one available for inspection: Time /1.2S /PM
Re -Inspection required: Yes (9
When corrections have been made, call for re -inspection at 303-234-5933
Date: 7/1/10 Inspector: r° A if
DO NOT REMOVE THIS NOTICE
w
41
CITY OF WHEAT RIDGE '
Building Inspection Divisio
/ (303) 234-5933 Inspection n
line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: G rc
Job Address:
Permit Number:
v �
l- /, /C- C_- S7�
Cfbahr\
�--N S 7 n -/
i ' DffZo , e
r
�� DrI� Zdh,JAl
f >J
IOP
S�Q; , 1) pR �f N1+[ 'a /1-0 A 1-0A
''N P'Pr
JA i I
,ONS
N 5 rp 7;7
Z.
2 i
❑ No one available for inspection: TimeZ._� A
Re -Inspection required: Yes /P
�No �f / ( f 6 Q i
When corrections havejV
been made, cal/ for_
re inspection at 30325933 t[
Date:
Inspector: F
F
DO NOT REMOVE TH/S NOT/C
E r
r t
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: P V 6'
Job Address: 73 $ a I A
Permit Number: ;, a t D 0-7 l X
00f),D
❑ No one available for inspection: Time AM/PM
Re -Inspection required: Yes No
When corrections have been made, call for re -inspection at 303-234-5933
�? Inspector:
DO NOT REMOVE THIS NOTICE
A i CITY OF WHEAT RIDGE
_1�9�Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: N S
Job Address: `6a9 % A
Permit Number: f -� t/d "7
Pp6�uv-t0
❑ No one available for inspection: Time AM/PM
Re -Inspection required: Yes No
When corrections have been made, call for re -inspection at 303-234-5933
Date:"- a ' �"9 Inspector:
DO NOT REMOVE THIS NOTICE
i CITY OF WHEAT RIDGE
�9Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office - (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: b W
Job Address: 3 Mh " `
Permit Number: 2,
❑ No one available for inspection: Time AM/PM
Re -Inspection required: Yes No
When corrections have been made, call for re -inspection at 303-234-
Date:- - %- /7 Inspector: OL��=4M
DO NOT REMOVE THIS NOTICE
A i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: /3 F� �_" "_ ) /� �-
Job Address: 1) . _. / f _ C
Permit'Number: 2O / % ef,*2r %/
❑ No one available for inspection: Time All/PM
Re -Inspection required: Yes/No
No
When corrections have been made, call for re-inspecti W at 303-234-59J3
f f,
t ; i i'
Date: `- r , Inspector:
{ DO NOT REMOVE THIS NOTICE
City of Wheat Ridge Municipal Building 7500 W. 29" Ave.
January 23rd, 2017
Owner/Occupant
3829 Taft Ct.
Wheat Ridge, CO 80033
Wheat Ridge, CO 80033-8001 P: 303.235.2855 F: 303.237.8929
RE: Previously permitted project plans available for retrieval — Permit 201500798 (New Single Family Home)
Owner/Occupant,
This letter is being sent to you because a project for which a permit was issued by the City of Wheat Ridge
Building Division and plans and/or other documents were required was recently completed and approved. In
accordance with the Building Division's document retention policy, the associated plans and/or other documents
are scheduled for disposal.
We are writing to offer you an opportunity to retrieve those approved plans and/or documents prior to their
disposal by the Building Division. The plans and/or documents are available for retrieval for a period of 20
working days (4 weeks) from the date of this letter and must be retrieved in person at the Building Division
offices. This letter must be presented at the time of retrieval of the plans and/or documents. Plans and/or
documents available for retrieval CANNOT be mailed and plans and/or documents will NOT be available for
retrieval after the expiration of the retrieval period, which is 60 days from the date of this letter.
You may retrieve plans and/or documents between the hours of 7:00 a.m. and 5:00 p.m., Monday through Friday,
at the Building Division offices located at 7500 W. 29d` Avenue in Wheat Ridge.
Cordially,
Melissa Mackey
Senior Pennit Technician
7500 W29th Avenue
Wheat Ridge, Colorado 800,1
Fax: 303-23 -8927
www.ei.w h eatridge.co.0 s
- IV City of
h6ataLdge
OtY Of Wheat Ridge Municipal Building 7500 W. 20 Ave, Wheat Ridge, CO 80033-8001 P: 301235.2855 F: 303.237.8929
Owner/Occupant
3829 Tabor Ct.
Whe
RE: Previously permitted project plans available for retrieval — Permit ##201500798 (New Single Family)
NME22=
This letter is being sent to you because a project for which a permit was issued by the City of Wheat Ridge
Building Division and plans and/or other documents were required was recently completed and approved. In
accordance with the Building Division's document retenti*% i
We are writing to offer you: an opportunity to retrieve those approved plans and/or documents prior to their
disposal by the Building Division. The plans and/or documents are available for retrieval for a period of 15
working days (3 weeks) from the date of this letter and must be retrieved in person at the Building Division
offices. This letter must be presented at the time of retrieval of the plans and/or documents. Plans and/or
You may retrieve plans and/or documents between the hours of 7:30 a.m. and 3:30 p.m., Monday through Friday,
at the Building Division offices located at 7500 W. 29'h Avenue in Wheat Ridge.
am=
Melissa Mackey
Senior Permit Technician
7500 W. 29th Avenue
Wheat MidZe,, &'j V0033
Fax: 303-237-8929
www.ci.wheatridge.co.us
www.chwheatridge.co.us
City of
eatPsk*d C
COMMUNITY DEVELOPMENT
FOR OFFICE USE ONL
Datc
Not
Plawpormit # t\
0660%%A"k 3829 Taft Court
Mailing Addmas.- (if different than property address)
Address: 7800 East Dorado Place, Suite 220
2y
P: Centennial, CO 80111 - 3telq-'�Zi
��: Same as above
Electrical: Electric Contractors, Inc.
W.R. City License# 080261
MM, nirzriroli&glm#jm * 0 .
130216 pop;303.779A100
-
Plumbing: Plumbing Unitd., Inc Mechanical: Smith & Willis HVAC
WR City License # 140008 WR City License # 80256
Other City Licensed Sub:
City License #
Complete all information on BOTH sides of this form
iii` f SINGLE FAVIL
J9,',,'Wh a t a'6atF<"9te- U. :fir r RE VIE W
Date; .
Location: ,
ATTENTION: TI N: L 11 IVISION
I have reviewed the submitted application documents to construct
located at the above referenced address. Please note the comments checked below.
1 Drainage:
a. Drainage better & flan required:
b. Site drainage/gradi
t„
City f
t_ Wh6at,R,Ldgc
LIC 'tag s
City of Wheat Ridge Municipal Building 7500 W 29'x' Ave. Wheat Ridge, CO 80033-8001 P� 301235.2861 ; 303-235,2857
Date:
Location of Construction.-
Purpose
onst tion:Pup se ofConstruction:
Single FamilyCommercial Multi - Family
l�eveic► est Ree�v true sire l�'e ....,.,;. ......::. ............
$100.00
(Required of all projects for document processing)
$50,00
C"cerrtmer°ia ulti-iia _°I° Review Fees:
.Review of existing or minimal technical. docuntents ..,.;......... $200A0
Initial review' of technical civil engineering documents
(Fee includes reviews of the I and 2"d submittals):--, . . $600.00
Trac Impact Study Review Fee:
(Fee includes reviews of the ]"and 2"d submittals) . .................... $500.00
Trip Generation Study Review Fee:00.00
0 & M Manual Review & SMA Recording Fee, ... ___ ........ $100.00
' .Facia Application will be reviewed by staff once and returned for changes, ges, If after review of the second submittal changes have
not been made to the civil documents or the Traffic Steady as requested by staffs further reviews of"the Application will be subject
to the following Resubmittal Fees:
Resubtuittal Fees.°
3'd submittal (V2 initial review fee) :... ......... .....:... .....;... $300.00
'h submittal (full initial review fee). ...... ..__., ..,...... 600.00
All subsequent submittals: ......... $600.00
(Full initial review Fee)
TOTAL RE.VIEWFEES (due at tirne of Building Permit issuance):
PLEASE NOTE THAT IN ADDITION TO THECNE, FRES, THERE WILL BE ADDITIONALLICENSING
D PERMITTING FEES REQUIRED FOR CONSTRUCTION OF IMPROVEMENTS WITHi a PUBLIC
RIGHT-OF-WAY.
r�"rr r�,t i.r�itacaata"ictt;e..cc>.tas
Rev 12x12
"Wh,6atf�Liqgc�
City Of wheat Midge Municipal Building 700 dv, 29th Ave.
Wheat Ridge,Co3 003-8001 P. 303.23.1 F": 303.2351857
NOTIRCATION FOR PUBLIC IWROVF
'MENTS
RESTORA770,
-ADDRESS:
Dear Contractor:
In conjunction with the approval of the building
dress, this letter is to inform you that all eistzn public improvements # above rererr
cc
frontage of said address shall e restored if da located along e
acceptable condition, as determined b ed o rely construction) to an
City of gat °die
to "
issuance o a Certificate o Public cy lie
Occupancy. anc . Department and prior
Prior to any constructionor mencin
g, the Inspection to determine the existing condition(s) s) o the tyrepresentative will conduct n onsite
public improvements atthis address,
If you have any questions, please contact me at303.235.2864,
Sincerely,
David F. Brossman, P.L.S.
Development Review engineer
CC File
Rev vos
Address: I 2� let-
Doud Subdivision, Filing 2, Lot #:
Applicable survey conditions:
FND (survey at foundation)
NRS (survey Prior to CO, ifWithin 2 feet of setback)
DOLID I Oandscaping)
DOUD2 (setbacks)
Lot Size: sq.
Maximum Building
Total Proposed Building Coverage: 1, 5 cs"
sq. ft.
'to
Setbacks: Required Provided
Interior Side loft
Side on street/open space 17 ft
InteriorRear 15ft
PeTimeter Rear
Is the structure within 2 feet of minimum setbacks?
(Ifyes, add surveying cOndition FND.)
ArchiteeMLI—I Le -view considerations pe r
L Q DR
Q Homes of lots siding to public r O -W and/or Open space tracts shall
architectural treatments on side fagade facing utilize same minimum
r -O -w or open space as front facades,
Front setbacks shall vary a minimum of 2.5 ft. No three
oadjacent homes or homes directly across
the street shall have the same frnt setback.
No two adjacent homes or homes across the street shall utilize the
elevation. Same architecturally detailed
12 Architectural features such as comices, eaves, belt courses, bay windows, sills
decks patios, and balconies May extend or The project into a setback a maximum 01 canopies, porches,
f thirty inches. first floor of the front elevation shall have a minimum of 67% ma 0 brick, brick v ,
stucco, stones, stone veneer or s s nry en
on the sides ® the homes. Ynthetic stone, with a full return (minimum 4' high) wainscoting
DIJve!Eav LeWew maLfderatioas:
Q Driveways cannot exceed 24' in width,
3190 S Wadsworth lvd., Suite 220, Lakewood, CO 80227
303,973.7766 Fax 303.973.7766
www.buildingcci.com
� I itII
• «
OWNER* Standard Pacific Homes
7800 E Dorado P1.
Greenwood Village, CO 80111
ARCHITECT: Woodley Architectural Group
731 South Park Dr
Littleton, CO 80120
STRUCTURAL: Felton Group
18325 N Allied Way
Phoenix, AZ 85054
MECHANICAL Four Seasons Mechanical
PLUMBING.* 4896 Marshall St
Wheatridge, CO 80033
Code Consultants International Copyright 2015, City of Wheat Ridge, 3829 Taft Court Review Page 3 of 7
This is a review of a new single family home. This is a ranch style home with a full
basement.
Code ConsiAtants international, Copyright 2015, City of Wheat Ridge, 3624 Taft Court Review Page 4 of 7
USE: Single Family Dwelling
Code Consultants Intemational -Copyright 2015, City of Wheat Ridge, 38291bft Court Review Page 5 of 7
Item # Sheet*
B-1 TS Verification of property lines and structure location by ILC or BSP is required prior to
performance of first framing related inspection
B-2 TS Work shall comply with the following codes; 2006 IRC, 2009 IECC and 20311 NEC
B-3 TS Foundation inspections shall be performed by the engineer of record and verified to the
Building Envision by wet -stamped letter, or approval
B-4 1-0 Egress windows required complying with 8310 of the 2006 IRC for size, height, location, well
and ladder requirements
B.5 2-0 Handrail and guard rail required for flights of stairs with 4 or more risers. 8311.5.6
B-6 2-4 In enclosed usable space beneath stairs, 112" min drywall is required can underside of stairs and
on adjacent walls
Glazing in walls or enclosures of bathtub or shower, less than 60 inches, measured vertically
B-7 2-4 from water edge and not: more than 60 inches above walking surface shall have safety glazing
per 8308.4
B-8 2-4 Gas fireplaces must comply with IFGC and manufacturer's installation specifications
B 2-4 Floor drain trap shall be fitted with a trap primer or be of the deep seal design; per section
3201.2
B_10 -4 Provide required service clearances for water heater per Chapter 5 of 20306 IPC
B-11 2-4 Shutoff valves required on lavatories and water closets
B-12 2-4 Water hammer arrestors are required at quick closing valves R2903.5
B-13 2.,4.1 in accordance with 2006 IRC, section 83038, safety glazing is required where indicated on plans
B-14 El ,O Outlet type, location and spacing shall comply with 2006 IRC and 2011 NEC.
B-15 E2.0 Smoke alarms shall be required in each sleeping room and outside each sleeping area per, 20306
IRC, section 313
B-16 E2.0 Outlets are required to be arc -fault protected
B-17 E2,0 Where is the electrical panel located?
B-18 03-1 Basement walls are requierd to be insulated per IRC section N1102.2.6
19 D-3, 4.1 Show flashing at window heads and sills. Sheet U-3 details 4 and 9 and garage door sheet 034.1
detail 2
20 D-6 Show the 2X nailer in note at Detail #3
21 fa -10 Walls in shower shall have non-absorbent finish to 6° above floor
B-22 0a-11 Drywall on garage ceilings beneath habitable space shall be fastened at a max 6" on center
B-23 D-6 All shingles shall be nailed with a tminirnurn of 6 nails per shingle and mid roof inspection
required on tile, concrete, or metal roofs.
B-24 S23 typ Provide truss manufacturer's profile drawings at time of frame inspection. Uplift connections
of all and bearing shall comply with drawings.
25 S2.3 typ Rafters shall bear full at heel cut and shall have one H2.5 clip
of all y p per rafter at bearing point.
Code Consultants 3nterriational - Copyright 2015, City or Wheat. Midge, 3829 Taft Court Review page. 6 of 7
Item
Sheet
Where are the third and fourth points of bearring for turss GI-FJO and CSI -CJ? Only two points of
S 2.3 typ
bearring are shown. Typical of all framing plans.
8-2
of all
-27
CShi
The City of Wheat Ridge uses a 105 mph wind gust.
B-28
Provide a RES check or a blower test will be performed at final inspection.
Code Consultants international w Copyright 203.5. City of Wheat Ridge, 3829 Taft Court Review Page 7 of 7
NVa
0%6-w* —ssenaar
Subject: Soil and Foundation Study
Proposed Residential Structure
Lot 9, Block 1
Doud Overlook
Wheat Ridge, Colorado
Project Number 135270
% =0
303-759-8100 Fax 303-756-2920
wwwagwassenaarcom
As requested, we have performed a soil and foundation study at the subject site. The purpose
our study was to observe subsurface conditions encountered and to recommend geotechnic
design criteria for the design and construction of the foundation for the proposed residence. Th
letter presents a summary of our findings and recommendations, li
gimi-sta w"r?
wi
e -6 1-M
ai• w
--f
i "
i
M#21111111i`miri� in ill, mminii clini •rill ii i
Depth to water: 13 feet at the time of drillin
0
12Y2feet 2 ys
da
Samples obtained during drilling were returned to the laboratory. They were visually classified a
subsurface materials encountered. Site specific laboratory swell/consolidation tests exhibit
"001i 010"Abo, - "-W V W-' 111111
Standard Pacific of Colorado, Inc.
Project Number 135270
January 31, 2014
Page 2
B OFAW
IT* Vr#V
materials generally exhibit no to low potential for expansion. Refer to the Colorado Geological
Survey Special Publication 43 for a description of expansive soils and their impact on structure
performance.
Foundation Recommendations
rEnt ME NO -
guidelines for the local area. The risk assessment of a site for potential movement is not absolute;
rather, it represents a judgment based upon the data available and our experience in the area.
Standard Pacific of Colorado, Inc.
Project Number 135270
January 31, 2014
Page 4
grade area. The purpose of the drain is to collect water which may become trapped on the surface
of the excavation and enter the basement or crawl space areas. A drain should be constructed
similar to the attached drain detail (Figure 1) and should be uniformly sloped to a positive gravity
discharge or sump.
If a sump pit is installed, it should be monitored for water accumulation and proper operation, The
water level in the sump pit should not be allowed to rise above the foundation drain inlet pipe($).
If water rises above the inlet pipe(s), a pump should be installed (if not originally equipped) or
maintenance should be performed on the existing pump.
RMZ33W=
carefully planned and maintained surface drainage. The following recommendations should
implemented during construction and maintained by the Homeowner after the residence
completed:
I Excessive wetting or drying of the open foundation excavation should be avoided
as much as practical during construction.
Standard Pacific • Colorado, Inc.
Project Number 135270
January 31, 2014
Page 5
2. The ground surface surrounding the exterior of the foundation should be
maintained in such a manner as to provide for positive surface drainage away
from the foundation. At completion of construction, we recommend a minimum
fall away from the foundation of 6 inches in the first 5 feet. This slope should be
continuous across the backfill zone.
3. Backfill around the foundation should be moistened and compacted in such a
manner as to reduce future settlement. Areas which settle should be filled as
soon as possible in order to maintain positive drainage away from the foundation.
4If lawn edging is used around the exterior of the foundation, it should be
constructed in a manner to prevent ponding of surface water in the vicinity of the
backfill soils.
5All drainage swales should be constructed and maintained a minimum of 5 feet
away from the foundation on side yards and 15 feet away from the foundation on
back and front yards. Drainage swales should maintain a slope of at least 2% off
of the lot, Swales must not be blocked by fences, landscaping, paths or other
Homeowner installed items.
6, Roof downspouts and drains should discharge well beyond the limits of foundation
backfill,
7. Watering adjacent to the foundation should be reduced as much as practic An
Landscaping which requires excessive watering should not be located within
feet of foundation walls, Main sprinkler lines, zone control boxes and drai
should be located outside the limits of the foundation backfill. Sprinkler hea
should be positioned such that the spray does not fall within 5 feet of foundati
walls. I
8. Plastic membranes should not be used to cover the ground surface immediately
surrounding the foundation. These membranes tend to trap moisture and prevent
normal evaporation from occurring. We recommend the use of a weed
suppressant geotextile fabric,
- - - - - - - - - - - - - - -----------
Standard Pacific of Colorado, Inc,
Project Number 135270
January 31, 2014
Page 6
conditions not indicated by the boring are possible and expected. Therefore, we should be retained
to observe the foundation excavation and construction in order to verify or revise our
recommendations. If unexpected subsurface conditions are observed by others during
construction, we should be called to review our recommendations.
This report was prepared for the exclusive use of our Client for the sole purpose of providing
geotechnical design criteria for the subject structure based upon the existing site conditions as
encountered. The conclusions and recommendations contained in this report shall not be
considered valid for use by Others without written authorization from A. G. Wassenaar, Inc. In
addition, the state of practice in geotechnical engineering is constantly evolving. Therefore,
findings presented in this report should be reviewed and revised, if necessary, prior to actual
construction.
If we can be of further service in discussing the contents of this letter or in analysis of the proposed
structure from the soil and foundation viewpoint, please call our office.
Sincerely,
X G. WAS E
----------- 4
Michael R. Conner,.ARN
Senior Engineer
Reviewed by:
Don Id , Jr.,
L. Tay kr
sidenti r,
MRC/DLT/Iia
Attachment: Figure 1
Statement of Services
BACKFILL
/_ SLIP ,101NT
NOTES:
1. DRAIN MUST SLOPE TO A POSITIVE
GRAVITY NUTLET AND/OR TO SUMP
WHERE WATER CAN BE REMOVED
BY PUMPING
2.. SLOPE BOTTOM OF TRENCH AND PIPE AT A
MINIMUM OF 1/3" PER FOOT (i.e. 1°;5)
3. 3 OR 4 -INCH DIAMETER RIGID PERFORATED PVC
PIPE (ASTM D2729 MINIMUM SCHEDULE 20), OR AN
APPROVED SUBSTITUTE
4. GRAVEL SPECIFICATION: 2" MINUS WASHED
ROCKIGRAVEL., POORLY GRADED WITH NO MORE
THAN 30% PASSING THE 3/84 SIEVE AND NO
MORE THAN 10% PASSING THE #4 SIEVE, OR AS
APPROVED BY THE GEOTECHNICAL ENGINEER
NON -WOVEN GEOTEXTILE FILTER FABRIC
WIDTH OF DRAIN
—DRAIN
GRAVELe EXTEND LATERALLY
TO EDGE OF FOOTING.cO
OF •► OF •ABOVE
PIPE AT HIGH POINT,
CONCRETE SLAB
BACKFILL
a `'
7DSLO8" PE TO — — DRAIN PIPE - (SEE NOTES #2 & )
RAIN MINIMUM AT LOCATION OF HIGH POINT,
ESTABLISH BOTTOM OF DRAIN
DO NOT EXCAVATE PIPE AT LEAST 4" BELOW
WITHIN 1:1 LINE BOTTOM OF FOOTING OR PAD
EXTENDING DOWN
AND AWAY FROM
CREATE MINIMUM 4" PATHWAYS THROUGH EDGE OF FOOTING
OR UNDER THE FOOTING WITH SOLID PCV
PIPE (NOTE 3) OR FOUNDATION VOID
MATERIAL, THE PATHWAYS SHOULD BE NOTE: NOT TO SCALE
BENEATH EACH WINDOW WELL AND AT A.G.
APPROXIMATE 15 FOOT INTERVALS AROUND '"°*"
THE FOUNDATION. GeotschnicalandEnvlranmentatCOns to t
DR 1 FTG 1 ENT-SOG MTF
JULY 2010
FOOTING FOUNDATION
TYPICAL INTERIOR FIGURE 1
DRAIN DETAIL
11
at
IIYDEWLOPMMT
SUIB-CONTRACTORAUTHORIZATION
t+i - Permit
General Contractor.- . Pacific Homes of..
L'lila T4e, Phon #. -' �
f A8t7dlo . Ma t e M,
1 Authorized Agent 1 Date
f-roject i itie:
Standard Pacific Fireside Plan 5062
Designed By:
Bob Guenther
Project Date:
Monday, February 17, 2014
Client Name:
Standard Pacific
Company Name:
Smith And Willis Heating And Air LLC
Company Representative:
Bob Guenther
Company Address:
8450 Rosemary
Company City:
Commerce City, CO 80022
Company Phone:
(303)688-4487 X_102
Company E -Mail Address:
bob@smithandwillis.com
Reference CPtyV!Etridge,
MoIoWdo
Building Orientation:
Front door faces Northeast
Daily Temperature Range:
High
I Latitude:
39 Degrees
Elevation:
5476 t
Altitude Factor:
9.817
Outdoor Outdoor Outdoor Indoor Indoor
Grains
try Bulb Wet Bulb Rel.Hurn Bel.Hum Dry Bulb
PLifferenc
e
Winter:
021 81% 30% 70
34.16
Summer: 91 59 15% 50% 75
-39
Total Building Supply CFM:
1,100 CFM Per Square ft.:
U00
Square ft. of RoomArea:
5,507 Square ft, Per Ton
2,909
Volume (W) of Cond. Space:
53,005
i �Total 0"eating ting InMudingMentilMfion A�ir�48�,227 Btuh
48.227 MBH
Total Sensible Gain:
24,583 Btuh
100 %
Total Latent Gain:
-1,865 Btuh
0 %
Total Cooling Required Including Ventilation Air: 24,583 Btuh
2.05 Tons (Based On
Sensible + Latent)
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance
data at your design conditions.
Y:\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM
Y:1 ... \Plan 50 2,rhv Tuesday, February 18, 2014, 3:19 PM
S P�rclY+d lr t i+�,+"I✓L�........ .,. .. «..,. M «
»......m i
Summer.
91 59 15% 50% 75 -39.04
j
(' Main Trunk
Runouts
i
Calculate. Yes
Yes
Use Schedule. Yes
Yes
Roughness Factor. 0.00300
0.01000
Pressure Crop: 0.1000 in.wg./100 ft.
0.1000 in wg./100 ft.`
Minimum Velocity: 850 ft./ruin
450 ft./min
[ Maximum Velocity: 900ft./mini
750 ft./min
Minimum Height: 0 in.
0 in.
Maximum Height: 0 in.
0 in. I
Winter
aurnmer
Infiltration Specified: 0.200 AC/hr
0.200 AC/hr
95 CFM
95 CFM
Infiltration Actual: 0.279 AC/hr
0.279 AC/hr 5
Above Grade Volume: X 28,403 Cut.
28.403 Cu.ft.
,1 C ..ft./hr Cu.ft./hr w
7 92
X ply}
.0167
X fq�7»,,t9y( y21
Total Building Infiltration. 132 CFM
132 CFM I
! Total Building Ventilation. 0 CFM
0 CFMI
` ---System I ---
Infiltration & Ventilation Sensible Gain Multiplier:
14.39 = (1,10 X 0.817 X 18«00 Bummer Temp. �
[difference)
Infiltration & Ventilation Latent Gain Multiplier:
-21.70 = (0.58 X 0.317 X -39.04 Grains Difference)
Infiltration & Ventilation Sensible Loss Multiplier.
82.04 = (1.10 X 0.817 X 59.00 Winter Temp.
I,
Difference)
Winter Infiltration Specified: 0.200 AC/hr (95 CFM)
{ Summer Infiltration Specified: 0.200 AC/hr (95 CFM
'
I
z
?
i
I
i
3
#
t
k
7
Y:1 ... \Plan 50 2,rhv Tuesday, February 18, 2014, 3:19 PM
dr a _.m care ; __ .__-
_.___...
sys
Net ft Sen t o
Nett s Duct
tj
Scb e to Icai7on Aria t in t3 lnSloe
#1� CFM.._
Building 2.05 2.05 2,688 5,507 24,883 -1,865 24;583 48,227 925 1,100 1,100
System 1 2,05 2.55 2,588 5,5017 24,583 1,865 24,583 48,227 925 1,100 1,100 25x1
Humidification 1,797
Zane 1 5,507 24,583 -1,865 24,583 46,430 825 1,100 1,100 12x1
1-Rec Room 839 1,104 -90 1,104 4,582 91 49 91 7,7
# 2 -Bath 4 52 9 .7 9 284 6 0 6 3
3 -RR 4 196 469 -18 469 1,100 22 21 22 6
4-Unf basement 1,664 1,903 -225 1„903 10,606 211 85 211 6,6,6 1
} -Creat Room 246 2,893 -216 2,893 4,342 87 129 129 7,
6-Kitchen/Nook 484 5,067 -275 5,067 4,244 85 227 227 8,8
7 -Dining 173 055 -112 955 1,470 29 43 43 7 s
8 -Master RR 306 3,702 •223 8,702 4,926 98 166 166 7,7,7
9 -WC 19 74 -32 74 269 5 3 5 3
10 -Master Bath 281 1,102 -118 1,102 1,659 33 49 49 5,
11 -WIC 93 226 -617 226 656 13 10 13 4
12 -BR 2 196 1,575 -54 1,575 2,556 51 70 70 6,6
1 -Bath 2 44 59 0 9 80 2 3 3_ 8
14 -Laundry 84 470 -113 470 1,431 29 21 29
15 -RR 3 179 1,208 94 1,302 1,439 29 54 54 7 j
16 -Bath 3 60 430 -83 430 855 17 19 194
17 -PIER 52 69 0 69 93 2 3 3 3 4
1 -Study 150 1,973 -63 1,973 2,914 58 88 88 6, 1
19 -Entry 93 815 -184, 815 1,885 38 36 38 5
20 -Hall 276 481 -4 481 1,039 21 22 22 5
I
Sure of room airflows may be greater than system aJrflow because
s stern room airflow o�tron use
the rester of heatin or coolie 1
I
l
{
I
t
{
YA ..APlan 5062.rhv Tuesday, February 16, 2014, 3:19 P
Duct Svstem
--- Duct Name: SMT -100, Feeds Into: Unf basement, Fitting: 1-01, Effective length: 147.+6
Trunk
0.0003
16.6
527
0.000
Up: Farr
55
25
0.322
0.033
j Rect
08
12
146.7
0.333
Presize
1,003
5.1
0.354
0.446
---Duct Name:: T-110,
Feeds Into: Unf basement, Effective length: 3.7
1 Trunk
0.0003
15.2
307
0.000
Up: SMT -100
128
20
0.010
0.070
Rect
3.7
10
0.0
0.000'
Presize
427
13.3
0.354
0.446
- Duct Name: ST -120,
Feeds Into: Unf basement, Effective Length: 2.5
Trunk
0.0003
18.6
322
0.000
Up: SMT -100
55
25
0.009
0.000
Rect
2.5
12
0.0
0.000
Presize
670
15.4
0.354
0.446'
--- Duct Name: SR -100,
Supplies: Master BR, Fittings: 2-1, 4-H, Effective Length: 42.8
Runout
0.0003
7
206
0.700
Up: ST -130
55
5.4
0.012
0.005'
Rnd
-9.7
7.7
40.2
0.005
Presize
55
4.9
0.345
0.455
---Duct Name: SR -110,
Supplies: Master BR, Fittings: 2-1, 4-G, 8•A2, 8-A2,
Effective Length: 78.8
Runout
0.0003
7
206
0.002
Up: ST -390
55
5.4
0.012
0.008
Rnd
14.2
7.7
64.6
0.009
Presize
55
26
0.340
0.460
---Duct Name: ST -130,
Feeds Into: Unt basement, Effective length: 0.8
Trunk
0.0003
6.7
198
0.000
r Up: ST -390
55
4
0.014
0.000
Rect
0.8
10
0.0
0.000
I Presize
55
_ 1.9
0.350
0.450
--Duct Name: SR -120,
Supplies: Master RR, Fittings: 2-1,4-G, Effective length: 73.6
Runout
0.0003
7
206
0.002
Up: T-270
55
5.4
0.012
0.007
Rnd
16.0
7.7
57.6
0.009
Presize
55
29.3
0.341
0.459
c --- Duct Name: ST -140,
Feeds Into: Unf basement, Effective length: 4.8
Trunk
0.0003
12.9
142
0.000
Up: ST -270
55
14
0.003
0.000
Rect
4.8
10
0.0
0.000
Presize
I
138
19.3
0.350
0.450
YA ...APlan 5062.rhv -
w..-___--- ..___.._-
Tuesday, February 18, 2014, 3`:19 PM
---Duct Name: SR -130, Supplies: WC, Fittings. -I, 4-G, Effective Length: 27.2
Runout
0.0003
3
102
0.001
Up: ST -290
123
2.4
0.010
0.001
Rnd "
11.8
3.3
15.3
0.003
Presize
5
9.3
0.348
0.452
---Duct Name: ST -150, Feeds Into: Unf basement, Effective Length 1.5
Trunk
0.0003
15.2
235
0.000
Up: ST -290
55
20
0.009
0,000
Rect
1.5
10
0.0
0.000
Presize
396
7.5
0.351
0,449
---Duct Name: SR -140, Supplies: Master Bath, Fittings: -I, 4-H, Effective Length: 40.5
Runout
0.0003
5
183
0.002
Up. SMT -100
55
3.90.015
0.004
Rnd
15.0
5.5
25.5
0.006 1
Presize
25
19.6
0.348
0.452
---Duct Name: SR -150, Supplies: Faster Bath, Fittings. 2-I, 4-M, Effective Length. 40.5
Runout
0.0003
5
183
0.002
Up: T-353
55
3.9
0.015
0.004
Rnd
15.0
5,5
25.5
0.006
Presize
25
19.6
0.346
0.454
---Duct Name. ST -160, Feeds Into: Unf basement, Effective Length. 3.3
Trunk
0.0003
15.2
415
0.001
Up: ST -350
55
20
0.019
0.000
Rect
3.3
10
0.0
0.001
Presize
577
16.7
0.351
0.449
---Duct blame; SR -160, Supplies: WIC, Fittings: 2-1, 4-G, Effective Length.
47.3
t
Runout
0.0003
4
149
0.0012
Up: ST -110
128
3.1
0.013
0.004
Rnd
16..2
4.4
31.1
0.006
Presize
13
16.9
0.348
0.452
---Duct Name: ST -170, Feeds Into: Unf basement, Effective Length: 2.0
Trunk
0.0003
15.2
298
0.000
Up: ST -110
128
20
0.009
0.000
Rect
2.0
10
0.0
0.000
Presize
414
10
0.354
0446
---Duct Dame: Sly -170, Supplies: BR 2, Fittings:
-1, 4-G, Effective Length: 56.5 .
Runout
0.0003
6
178
0.002
Up: ST -400
55
4.7
0.011
0.005
Rnd
16.2
6.6
40.3
0.006 1
Presize
35
25.4
0.347
0.453 x
YA ..APlan 5062.rhv Tuesday, February 18, 2014, 3:19 P
r
---Duct Name: ST -180, Feeds Into: Unf basement, Effective Length: 2.0
Trunk
0.0003
15.2
235
0.000
Ur: ST -190
55
20
0.007
0.010
Rect
2.0
10
0.0
0.000
€
Presize
327
10
0.353
0.447
---Duct Name: ST -190,
Feeds Into: Unf basement, Effective Length: 0.7
Trunk
0.0003
15.2
235
0.000
Up: ST -400
55
20
0.007
0.000
Rect
0.7
10
0.0
0.000 r
Presize
327
3.3
0.354
0.446
,._-Duct Name: ST -200,
Feeds`Into: Unf basement, Effective Length: 9.3
Trunk
0.0003
15.2
210
0.001
Up: ST -180
55
20
0.005
0,000
Rect
9.3
10
0.0
0.001
IPresize
292
45.7
0.353
0.447
---Duct Name: SR -180,
Supplies: Sit 2, Pittings::
2-1,4-H, 8 -A2,8 -A2, Effective Length: 69.0
Runout
0.0003
6
178
0.003
Up: ST -180
55
4.7
0.011
0.005
Rnd
23.2 -
6.6 ';
45.9
0.008
Presize
35
36.4
0345
0.454
___Duct Name: SR -190,
Supplies: Study, Pittings': 2-1,4-G, 8-A2, 8-A2, Effective Length: 72.6
Runout
0.0003
6
224
0.003
Up: ST -220
55
4.7
0.017
0.009
Rnd
183
6.6
54.2
0.01
Presize
44
28.8
0337
0.463
---Duct Marne: SR -200,
Supplies: Study, Fittings: -1, 4-G, Effective Length: 67.9'
r
Runout
0.0003
6
224
0.003
Up: T-380
55
4.7
0.017
0.008
Rnd
19.5
6.6
48.4
0.011
Presize
44
30.6
0.338
0.462
--- Duct Name: ST -210,
Deeds Into: Unf basement, Effective Length: 1.2
Trunk
0.0003
9.8
144
0.000
Up: T-380
55
8
0.005
0.000
Rect
1.2
10
0.0
0.000
Presize
80
3.5
0.350
0.450
---Duct Name: SR -210, Supplies: Entry, Fittings: 2-1,4-1, Effective Length: 23.0
Runout
0.0003
5
279
0:000
Up. ST -210
128
3.9
0.028
0:007
Rnd
0.0
5.5
23.0
0.007
Presize
38
0
0.343
0.457
Y:1.,.1Plan 5062.rhv
Tuesday, February 18, 2014,
3:19 PM
---Duct Name: ST -220, Feeds Into: Unf basement, Effective Length: 1.0
Trunk
0.0003
9.8
79
0.000
Up. ST -210
55
8
0.002
0.000
Rect
1.0
10
0.0
0.000
Presize
44
3
0.350
0.450
---Duct Name: SR -220, Supplies: Bath 3, Fittings: 2-1, 4-G, Effective Length: 44.7
Runout
0.0003
4
218
0.005
Up: ST -370
55
3.1
0.027
0.007 x
Rnd
19.5
4.4
25.2
0.012 t
Presize
19
20.4
0.339
0.461
--- Duct Name:. ST -230, Feeds Into: Unf basement, Effective Length: 1.3
Trunk
0.0003
9.8
302
0.000 E
Up: T-370
128
8
0.016
0.000
Rect
1.3
10
0.0
0.000
Presize
168
4
0.351
0.449
---Duct Name: SR -230, Supplies: BR 3, Fittings:
2-1,4-G, Effective Length: 77.0
Runout
0.0003
7
202
0.002
Up: ST -360
55
5.4
0.012
0.007 !
Rnd
19.7
71
577
0.009
Presize
54
36
0.343
0.457
--- Duct Name: ST -240, Feeds Into: Unf basement, Effective Length: .2
Trunk
0.0003
12.9
213
0.000
Up: T-360
128
14
0.006
O.00O
Rect
7.2
10
0.0
0.000
Presize
207
28.7
0.351
0.449
---Duct Name: SR -240, Supplies: Hall, Fittings:
2-1, 4-G, Effective Length: 44.1
s
Runout
0.0003
5
161
0.001
Up: T-310
55
3.9
0.012
0.005
Rnd
5.5
5.5
38.6
0.005
Presize
22
7.2
0.347
0.453
---Duct Name: ST -250, Feeds Into: Unt basement, Effective Length: 1.8
Trunk
0.0003
12.9
256
0.000 F
Up: ST -310
55
14
0.009
0.000
Rect
1.8
10
0.0
0.4100
Presize
249
7.3
0.352
0.448
_--Duct Name: R-250, Supplies: Dining, Fittings: 2-1, -N, -A2, 8-A2, Effective Length 91.3
h
Runout
0.0003
7
161
0.003 ?
Up: ST -120
55
5.4
0.008
0.004 !
Rnd`
40.2
7.7
51.1
0.007 f
Presize
43
73.6
0.347
0.453 I
YA :..\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 Pik
---Duct Name: ST -260; Feeds Into: 1 of basement, Effective Length. 3.5
Trunk
0.0003
15,2
451
0.001
Up: ST -120
55
20
0.022
0.O00
Rect
3.5
10
0.0
0.001 1
Presize
627
17.5
0.353
0.447
--- Duct Name: SR -260, Supplies: Kitchen/Nook, Fittings: 2-1, 4-1.1, Effective Length: 60.6
Runout
0.0003
8
324
0.002
Up: T-300
55
6,2
0,022
0.012
Rnd
7.7
8.7
52.9
0.014
Presize
113
16.1
0.337
0.463 €
---Duct Name: ST -270, Feeds Into: Unf basement, Effective Length: 6.8
Trunk
0.0003
12.9
199
0.000
Up: ST -300
55
14
0.006
0.000
Rect
6.8
10
0.0
0.000
Presize
193
27.3
0.350
0.450
r
---Duct Name: SR -270, Supplies: Kitchen/Nook, Fittings: 2-1, 4-G, Effective Length: 94.1
Runout0.0003
8
324
0:006
Up: ST -160'
55
6.2
0.022
0.015
Rnd
27.3
8.7
66.7
0.021
Presize
113
57.2
0.330
0.470
---Duct Name: ST -280, Feeds Into: Unf basement,
Effective Length: 4.8
�
Trunk
0.0003
15.2
334
0.001
Up: ST -160
55
20
0.013
O.00O 4
Rect
4.8
10
0.0
0.001
Presize
464
24.2
0.351
0.449
---Duct Name: SR -280, Supplies: great Room, Fittings: 2-1,4-G, 8 -A2,8 -A2, Effective Length: 110.4
Runout
0,0003
7
243
0.006
Up. ST -280
55
5.4
0.016
0.012
Rnd
35.8
7.7
74.6
0.018
Presize
65
65.7
0.333
0.467 r
---duct Name: ST -290, Feeds Into: Unf basement, Effective Length: 0.8
Trunk
0,0003
15.2
287
0.000
Up: ST -280
55
20
0.010
0.000
Rect
O.8
10
0.0
0.000 1
Presize
399
4.2
0.351
0.449
---Duct Name- SR -290, Supplies: Great Roam,
Fittings: 2-1,4-G, 8 -A2,8 -A2, Effective Length: 113.1
Runout
0.0003
7
243
0:007
1 Up: ST -340
55
5.4
0.016
0.011
Rnd
45.8
7.7
67.3
0.018
Presize
w
65
84
0.332
0,468
YA ...\Plan 5062,rhv Tuesday, February 18, 2014, 3:19 PM
--Duct Name. ST -300, Feeds Into: Unt basement, Effective Length.. 3.2
Trunk 0.0003 15.2
220
0.000 Y
Up. ST -340 55 20
0.006
0.000
I Rect 3.2 10
0.0
0.000
Presize 306 15.3
0.350
0.450 ;
--- Duct Name. SR -300, Supplies. Laundry, Fittings. -1, 4-G, Effective Length. 36.7
i
Runout 0.0003 4
332
0.003
Up. ST -200 126 3.1
0.051
0.016
Rnd 5.8 4.4
30.3
0.019
p(Y Presize - 29 6.1
.0.334
0.466
---Duct Name. ST -31O, Feeds Into. Unf basement, Effective Length.. 7.2
Trunk 0.0003 12.0
270
0.001
Up, T-200 55 14
01.011
0.{700
Rct 7.2 10
0.0
0.001 I
Presize 271 28.7
0.352
0.448
---Duct Name. SR -310, Supplies: Lath 2, Fitting. 4-G, Effective Length. 10.2
Runout 0.0003 3
61
0.000
Up; ST -1705 2.4
0.005
0.000
Rnd 3.7 3.3
6.5,
0.000
Presize 3 2.9
0.353
0.447
---Duct Name. ST -32O, Feeds Into. Unf basement, Effective Length: 1.
}
Trunk 0.0003 15.2
297
0»000
Up, ST -170 128 20
0.009
0.000 1
Ret 1.3 10
0.0
0.000
Presize 412 6.7
0.354
0.446
---Duct Name. SR -320, Supplies. PDR, Fittings. 2-1,4-G, Effective Length.
21.2
Runout 01.0003 3
61
0x000
Up. T-230 55 2.4
0.005
0.001
Rnd - 6.5 3.3
14.7
0.001
Presize 3 5.1
0.350
0.450
--Duct Name. ST -330, Feeds into. Unf basement, Effective Length. 5.8
E
Trunk 0.0003 9.8
299
0.001
Up: ST -230 128 8
0.015
0.000
Rech 5.8 10
0.0
0.001
Presize 166 17.5
0.350
0.450 t
--Duct Dame: SR -330, Supplies: Rec Room, Fittings. 2 -1,4 -AD, 8-A2, 6-A2,
Effective Length: 109.5 I
Runout 0.0003 7
172
0.003
Up: ST -150 128 5.4
0.008
0.005
Rnd 41.01 7.7
68.5
0.009
Presize 46 75.1
0.342
0.458 I
YA ...\Plan 5O62.rhv Tuesday, February 18, 2014, 3:19 P
YA ..APlan 5062.rhv Tuesday, February 18, 2014, 3:19 PM
-Duct Name: ST -340, Feeds Into* Unf basement, Effective Length: 0.
I
Trunk 0.0003 15.2
267
0.000 '
Up: ST -150 55 20
0.008
0.000
Rect 0.8 10
0.0
0.000
Presize 371 4.2
0.351
0.449
---Duct Name: SR -340, Supplies: Rec Room, Fittings: 2 -1,4 -AD, Effective
'Length: 35.3
t
Runout 0.0003 7
172
0.003
`
Up: T-260 120 5.4
0.005
0.004
Rnd 31.7 7.7
53.7
0.007
Presize 46 58
0.:347
0.453
r
---Duct Name: ST -350, Feeds Into: Unf basement, Effective Length: 6.3
Trunk 0.0003 15.2
433
0.00 , 3
Up: ST -260 55 20
0.020
0.000
Rect 6.3 10
0.0
0.001
Presize 602 31.7
0.352
0.446
E
--Duct Name: SR -350, Supplies: Bath 4, Fittings: 2-1, 4 -AD, Effective Length: 28.5
f
Runout 0.0003 3
122
0.001
U: ST -250 128 2.4
0.013
{3.002
Rnd 11.2 3.3
17.3
0.001
Presize 6 8.8
0.348
0.452 .
---Duct Name: ST -360, Feeds Into: Unf basement, Effective Length: 3.3
Trunk 0.0003 12.9
256
0.000
Up: ST -250 55 14
0.009
0,000
r
Rect 3.3 10
0.0
0.000
Presize 249 13.3
0.352
0.448
`--Duct Name: SR -360, Supplies: BR 4, Fittings: 2 -1,4 -AD, Effective Length: 55.7
I
Runout 0.0003 6
112
0.001
Up: ST -240 128 4.7
0.005
0.002
Rnd 19.2 6.6
36.5
0.003
Presize 22 30.1
0349
0.451
---Duct Name: ST -370, Feeds Into: Unf basement, Effective Length: 1 «5
Trunk 0.0003 12.9
190
0:000 }
Up: ST -240 128 14
0.005
0.000 f
Rect 1.5 10
0.0
0.000
Presize 185 6
0.351
0.449
.-®Duct Name: SR -370, Supplies: Unf basement, Fittings: 2-1, 4 -AD, Effective Length: 72,4
Runout 0.0003 6
357
0.006
l
Up: ST -330 128 4.7
0.035
0.019
Rnd 16.2 6.6
56.2
0.025
I
Presize 70 25.4
0.325
0:475 1
4
YA ..APlan 5062.rhv Tuesday, February 18, 2014, 3:19 PM
--- Duct Name. T-380, Feeds Into: Unt basement, Effective Length: 1.7
1,288
Main trunk airflow:
Trunk
0.0003
9.8
223
0.000
Up: ST -330
55
8
0.010
0.000
Rect
1.7
10
0.0
0.000
Presize
124
5
0.350
0.450
---duct Name. SR -380, Supplies: Unf basement, Fittings: 2 -1,4 -AD, Effective Length: 60.6'
Runout
0.0003
6
357
0.004
Up: ST -140
128
4.7
0.035
0.017
Fend
11.7
6,6
48.9
0.021
Presize
70
18.3
0,329
0.471
---!Duct Name: ST -390, Feeds Into: Unf basement, Effective Length: 1.8
Trunk 0.0003 12.0 113
Up: ST -140 55 14 0.002
Elect 1.8 10 0.0
Presize 110 7.3 0.350
---Duct Name. SR -390, Supplies: Unf basement, Pittings. 2--I, 4 -AD, Effective Length: 67..1
Runout 0.0003 6 357
Up: ST -320 128 4.7 0.035
Rnd 14,51. , 6.6 52.6
Presize 70 22,8 0.330
---Duct Name:`ST-400, Feeds Into: Unf basement, Effective Length: 1.8
Trunk 0.0003 15.2 261 0.000
Up: ST -320 55 20 0,008 0.000
Rect 1.8 10 0.0 0.000
Presize 362 9.2 _ 0,354 0,446
t
Report Units: Pressure: in.wg, Duct lengths: feet, Duct sizes: inch, Airflow: CFM, Velocity: ft./min, Temperature:
Total runout outlet airflow:
1,288
Main trunk airflow:
1,098
Largest trunk diameter:
18.6 SMT -100
Largest runout diameter:
8 SR -260
YA ..APlan 5062,rhv < Tuesday, February 18, 2014, 3:19 PM
S-mallest trunk diameter:
8.7
ST -130
Smallest runout diameter:
3 '
S1-1303
Supply fan external static pressure:
0.800
Supply fan device pressure lasses:
0.300
Supply fan static pressure available:
0.500
Runout maximum cumulative static pressure less:
0.475 "
SR -370
Return lass added to supply:
0.113''
Total effective length of return ( ft.):
472.7
Lowy
Total effective length of supply ( ft.):
2618.9
R-370
Overall total effective length ( ft.):
741.7
Love to SR -370
Design overall friction rate per 100 ft.:
0.067
(Available SP x 100 / TFL)
Systems duct surface area.. (No Scenario):
1279.1
Total system duct surface area:
1279.1
PKIRTO-.��
Tuesday, February 18, 2014, 3:19 PM
---Duct Name: RMT -100, Feeds From: Unf basement, Fittings. 5-141 S -L, Effective Length: 258.2
Trunk 0.0003 18.6
515
O.00O
Up: Fan 75 25
0.029
0.075 I
Rect 0.5 12
257.7
0.075
i Presize 1,255 3.1
-0.038
0.113 ;
---Duct Name; RT -1 10, needs From: Unf basement, Effective Length: 0.
Trunk 0.0003 18.5
345
0.000 ,
Up: RMT -100 75 25
0.010
0.000 i
Rect 0.5 12
0.0
0.000 r
Presize _ 71,8 3.1
`0.037
0.030
---Duct Name: RT -120, Feeds From: Unf basement, Effective Length: 2.7
Trunk 0.0003 12.0
369
0.000 ,1
Up: RT -140 75 14
0.017
0.000
Rect 2.7 10
0.0
O.t O
Presize 350 10.7
4037
0.020
---Duct Name: RT -1 Feeds From: Unf basement, Effective Length: 2:7
Trunk 0.0003 12.0
369
0.000
Up. RT^110 75 14
0.017
0,000
Rech 2.7 10
0.0
OMO
Presize _ 359 10.7
0.037
0.030
«--Duct Name: RT -140, Feeds From: Unf basement, Effective Length: 1.2
Trunk 0.0003 18.6
172
0.000
Up: RT -110 75 25
0.003
0.000 !
Rect 1,2 12
0.0
0.000
Presize 359 7.2
-0.037
0.030
---Duct Name: RT -150, Feeds From. Unf basement, Effective Lengths: 1.0
Trunk 0.0003 18.8
274
0.000
Up: RMT -100 75 25
0.007
0.000
Rect 1.0 12
0.0
0.000 6
Presize 570 6.2
-0.037
0.112
S
-..Duct Name: RT -160, Feeds From:: Unf basement, Effective Length: 12.8
Trunk 0.0003 10
616
0.007 1
Up: RT -150 75 7.8
0.052
0.000
Rnd 12.8 10.9
0.0
0.007
Presize 336 33.6
_0.031
0,106
--Duct Name: High, Returns From: Kitchen/Nook, Fittings: 6.18, 6-H, 8-83C,
Effective Length: 169.9
Runout 0.0003 12.9
3690.000
Up: RT -120 75 14
0.017
0.029
Rect 0.5 10
169.4
0.029
Presize 359 2
-0.008
0.029
YA ..APlan 5062.rhv Tuesday, February 18, 2014, 3:19 PM
---Duct Name. Low, Returns From: Kitchen/Nook, Fittings: 6-13, 6- 8-83C, Effective Length: 170.0
Runout
0.0003
12.9
369
0.000
Up: RT -130
75
14
6.017
0.029
Rect
0.6
10
169.4
0.029 I
Presize
359
2.4
-0.008
0.029 I
--- Duct Name. RT -170, Feeds From* Unf
basement, Effective Length: 5.7
Trunk
0.0003
9.8
421
0.002
Up: RT -150
75
8
0.031
0.000
Rect
5.7
10
0.0
0.002
Presize
234
17
W0.036
0.027 j
€�
--- Duct Name: RT -180, Feeds From: Unf
basement, Effective Length: 6.7
Trunk
0.0003
9.8
421
0.002
Up: RT -170
75
8
0.031
0.000
Ret
6.7
10
11.0
0.002 �
Presize
234
20
`0.034
0.025
---Duct Name: Lava, Returns From: Rec
Room, Fittings: 6-C, 6-G, 8-A2, Effective Length: 200.7
a
Runout
0.0003
12.9
346
0.000
Up; RT -160
75
14
0.015
0.031 i
Rect
0.5
10
200.2
0.031
Presize
336
2
0.000
0.031
---Duct Name. Mstr High,
Returns From.
9€
Master RR, Fittings. 6-C, 6-G, 12.5, Effective Length: 37.8
Runout
0.0003
7
292
0.000
Lip: RT -180
75
5.4
0.022
0.008
Rnd
0.3
77
37.6
0.008
Presize
78
0.6
-0.026
0.008 ;
---Duct Name: RT -198, Feeds From: Unf basement, Effective Length: 1.5
s
Trunk
0.0003
9.8
281
0.000
Up: RT -180
75
8
0.015
0.000
Rect
1.5
10
0.0
0.000
Presize
156
4.5
-0.033
0.025
---Duct Name. Mstr High,
Returns From: Master BR, Fittings: -C, 6-G, 12-5, Effective Length* 68.9
Runout
0.0003
7
292
0.000 ?
Up: RT -190
75
5.4
0.022
0.011
Rnd
0.3
7.7
50.5
0.011
Presize
78
0.6
-0.023
0.011
---Duct Name. RT -200, Feeds From: Un# basement, Effective Length: 1.8
{ Trunk
0.0003
9.8
140
0.000
Up: RT -190
75
8
0.004
0.000
Rett
1.0
10
0.0
0.000
Presize
78
3
•0.033
0.025
YA ...\Pian 5062.rhv Tuesday, February 18, 2014, 3:19 PM
--- Duct Name: M tr Low, Returns From: Master RR, Fittings: 6-C, 6-G, 12-S, Effective Length: iii .
Runout 0.0003 7 292 0 000
Up: RT -200 ` 75 5,4 0.022 0.023
Rnd 9.7 7.7 1055 0.023
Pr size 78 1.2 0.011 9.323
Report Units: Pressure: in.wg, Duct lengths: feet, Duct sizes: inch, Airflow: CFM, Velocity: ft./min, Temperature:
F
Notes: Static pressure available values for return ducts are at the entrance of the duct. For supply, they are at
the exit. The cumulative static pressure loss value for a return trunk is with respect to the entry point of the
return runout upstream with the highest static pressure available. Total and cumulative static pressure loss
values for the supply main trunk include any device pressure losses entered, and the cumulative may also
include the total static pressure loss of the return side.
` INUI! V"If iii WILIVU t! ul lm 9..
! 1
Numberofactive runouts:.
6:
Total runout outlet airflow;
1,288
Main trunk airflow:
1,288
Largest trunk diameter:
18.6
RMT -199
Largest runout diameter:
12.9>,
High
Smallest trunk diameter:
9.8
RT -170
Smallest runout diameter:
7
Mstr Nigh
Runout maximum cumulative static pressure loss:
{3.681
Low
$ Return loss added to supply:
0.113
Total effective length of return ( ft.):
472.7
Low
System duct surface area (No Scenario):
127,8
[ Total system duct surface area:
127:8
Calculationsperformed per ACCAManual J 8th Edition,# 2, and AccA manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance
data at your design conditions.
-------------
Y:\ ..x\Plan 5062.rhv Tuesday, February 18, 2614, 3:.19 PM
R6.2 Door: poor -U=.161
24
267
0
85
85
151315-0w-9: Wall-
903.2
3,115
0
39
39
Basement R11-9: Wall -Basement, Custom, R-11
1828.3
6,641
0
89
89
Basement wall
12F-0sw: Wall -Frame, R-21 insulation in 2 x 6 stud cavity, 2140.9
9,604
0
1,574
1,574
no board insulation, siding finish, wood studs
1613-38: Roof/Ceiling-Under Attic with Insulation on Attic
2757.5
4,947
0
3,295
3,295
Floor (also use for Knee Walls and Partition Ceilings),
Vented Attic, No Radiant Barrier, Dark Asphalt
Shingles or Dark Metal, Tar and Gravel or Membrane,
R-38 insulation
21A-32: Floor -Basement, Concrete stab, any thickness, 2
2749.9
3,795
0
0
0
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 32' wide
Subtotals for structure:
38,242
0
17,895
17,895
People:
5
1,000
1,150
2,150
Equipment:
0
1,200
1,200
Lighting:
0
0
n
Ductwork:
0
0
0
0
Infiltration: Winter CFM: 132, Summer CFM: 132
8,188
-2,865
1,897
-968
Ventilation: Winter CFM: 0, Summer CFM: 0
0
0
0
0,
Humidification (Winter) 4.90 gal/day:
1,797
0
0
0
ASD Excursion:
.... ....... .....
0
0
2,441
...... . ........
2,441
Total Building Load Totals:
48,227
-1,865
24,583
22,718
Total Building Supply CFM: 1,100
CFM Per Square ft.:
pSp
0.200
Square ft. of Room Area: 5,507
Square ft, Per Ton:
2,90
Volume (W) of Cond. Space: 53,005
I Total HeatNng Required including Vntilatlon Air::.
48}227 Btuh
48.227 MSH
` Total Sensible Cain:
24,583 Btuh
190 �l�
Total Latent Gain:
-1,865 Btuh
0 %
Total Cooling Required Including Ventilation Air:
24,583 Btuh
2.05 Tons (Based
On
Sensible + Latent)
ffhv-aCi�-'an-AC-C-A--a--p-p--ro--v-e-d -Manual J and Manual D computer program.
performed Per ACCA Manual J 8th Edition, Version 2, and ACCA manual D.
Calculations are
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manutacturer's performance I
data at your design conditions. I
Y:\ . . \Plan 5062. rhv Tuesday, February 18, 2014, 3:19 PM
Atrium: Glazing -.31/,33, u -value 0.31, SHGC 0.33
437
9,347
Rear Entry Door: Door -R=2.8
21.4
526
R6.2 Door: Door -U= ..161
24
267
16815 -Ow -9, Wall-
9012
3,115
Basement R11-9. Wall -Basement, Custom, R-11
1828.3
6,641
Basement wall
1,574
1,574
12F-Osw: Wall -Frame, R-21 insulation in 2 x 6 stud cavity,
2140.9
9,604
no board insulation, siding finish, wood studs
0
0
1613-38: Roof/Ceiling-Under Attic with Insulation on Attic
2757.5
4,947
Floor {also use for Knee Walls and Partition Ceilings),
1,150
2,150
Vented Attic, No Radiant Barrier, Dark Asphalt
1,200
1,200
Shingles or Dark Metal, Tar and Gravel or Membrane,
0
0
R-38 insulation
0
0
21 A-32: Floor -Basement, Concrete stab, any thickness, 2
2749.9
3,795
or more feet below grade, no insulation below floor,
0
0
any floor cover, shortest side of floor slab is 3' wide
0
Subtotals for structure:
2,441
38,242
People:
5
22,718 1
Equipment:
Lighting:
0
Ductwork:
0
Infiltration: Winter,CFM: 132, Summer CFM: 132
8,1'88
Ventilation: Winter CFM: 0, Summer CFM: 0
0
Humidification (Winter) 4.90 gal/day
1,797
AED Excursion:0
..... ... . . .. .... ......... .
System I Whore blouse System Load Totals
43,2127
z5upply
Square ft. of Room Area:
Volume UP) fitond. I '',?,ce:
1,100 CFM Per Square ft.,
5,507 Square ft, Per Ton:
53,005
0
12,645
12,645 1
0
168
168
0
85
85
0
39
39
0
89
89
0
1,574
1,574
0
3,295
3,295
0
0
0
0
17,895
17,895
1,000
1,150
2,150
0
1,200
1,200
0
0
0
0
0
-2,865
1,897
-968
0
0
0
0
0
0
2,441
2,441
-1,865
24,583
22,718 1
RM
Total Heating Required Including Ventilation Air-
48,227
Btuh
48.227
MBH
Total Sensible Gain:
24,583
Btuh
100
%
Total Latent Gain:
-1,865
Btuh
0
%
Total Cooling Required Including Ventilation Air:
24,583
Btuh
2.05
Tons (Based On
Sensible + Latent)
Rhvac is an ACCA approved-glanual J and ffianual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturers performance
data at your design conditions.
Y:\ ..\Plan 5062,rhv Tuesday, February 18, 2014, 3:19 PM
__
Gaoling
System Type: ''
Standard Air Conditioner
Outdoor Model.
CA13NA436""(A,B)
Indoor Model.
CNPV*4221AL*+TDR
Tradename:
13 SEER PIRON AC
Outdoor Manufacturer:
CARRIER AIR CONDITIONING
AHRI Reference No.:
6395466
Nominal Capacity:
33444
Efficiency:
13 SEER }
t
Heating
1
System Type:
Natural Gas Furnace
Model:
59SUB464S21--24
Tradename:
Carver
Manufacturer:
CARRIER CORPORATION
Description;
Natural Gas or Propane Furnace
Capacity.
75499
Efficiency:
92;1 AFUE
i
E
f
Y:\ ...\Plan 5 62,rhv Tuesday, February 18, 2414, 3;19 P
Room Length:
839.1
t.
System Number:
1
f
Room Width:
1.0
Vit.
Zone Number:
1
I
Area:
839.0
sq.ft.
Supply Air:
91
CFM
Ceiling Height-
10.2
ft.
Supply Air Changes:
0.6
AC/hr
€, Volume:..
8,530.0
cu.ft.
; Req. Vent. Clg:
0
CFM
Number of Registers:
2
SW -(FIs -Atrium shgc-0.33 O%S
Actual Winter Vent.:
0
CFM
342
30.8
0
Percent of Supply.:
0
%
0.020 _.
_1.4
_ 1,158
Actual Summer Vent.:
0
CFM
Subtotals for Structure.
Percent of Supply:
0
%
0
935 s
Infil.: Win.: 4.1, Sum.. 4.1
Actual Winter Infil.:
4
CFM
256
0.657
-90
Actual Summer Infil.:
4
CFM
10.2
SE -Wail -15B15 -Ow -9 14.4 X
145
0.047
3.6
523
0.1
0
10
10.2
SW -Wall -15815-0w-9 17 X 102
155.9
0.047
3.3
522
0.0
0
3
NW -C ls-Atrium sh e-0. 3 Q% a
15
0310
21.4
342
25.6
4
409 1
SW -(FIs -Atrium shgc-0.33 O%S
16
0.310
21.4
342
30.8
0
492
Floor -21A-32 1 X 839tt 1. _
839..1
0.020 _.
_1.4
_ 1,158
0.0?
0
Subtotals for Structure.
4,326
0
935 s
Infil.: Win.: 4.1, Sum.. 4.1
90
2.853
256
0.657
-90
59
AI3 Excursion
_,. _.... _._.__................_ __ .,...._,.. . .._... ,....,_......
..,,.,.,...., .,
,,,...,. ., _.. ._..._..
,,........_._, ..,...._
..,__._�,. ,...,,
....... ,.. ,. _ .......
......,... ,,...:._.....---
......,11_0,_ j
Room Totals..
4,582
-90
1,104
r
1
i
2
i
i
t
f
t
s
1
E
i
s
z
t
e::i ...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM
Room Length:
5.3
ft.
System Number:
Room Width:
9.7
ft.
Zone Number:
Area:
52.0
sq.ft.
Supply Air.
Ceiling Height.
10.2
ft.
Supply Air Changes:
Volume:
524.0
cu.ft.
Rett. Vent. Clg:
Number of Registers:
1
Actual Winter Vent.:
Percent of Supply.:
Actual Summer Vent.;
Percent of Supply:
Actual Winter Infil..
Actual Summer Inf l.:.
�
F
e.._ m0---q ....
.
Subtotals for2Structure;'
CFM
0.6
AC/hr
0
CFM
0
CFM
0
%
CFM
0
%
0
CFM
0
CFM
. .. �.
, __.� �.. ,i7 i? i�_� a . m . `... , . _ _ . 1 � .._..
e.._ m0---q ....
.
Subtotals for2Structure;'
265
0
4
Infil.: Win.: 0.3, Sum.. 0.3
7 2.321 19 0.615
-7
4�
AFC Excursion:
1
Room Totals:
284
_7
9
I
1
i
i
I
I
}
}
r'.\ .,.\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM
Room Length:;
Room Width:
Area:
Ceiling Height:
Volume:
Number of registers:
14.7
ft.
System Number,
13.3
ft.
Zone Number:
196.0
sq.ft,
Supply Air:
10.2
ft.
Supply Air Changes:
1,988.0
cuft
Req. Vent. Clg:
1
0
Actual Winter Vent.:
1
CPM
Percent of Supply.:
CFM
Actual Summer Vent.:
Room Totals:
1,100
Percent of Supply:
469
I
t
3
F
i
j
by
E
Actual Winter Infil.:
Actual Summer Infil.:
1
1
22
CFM
0.7
AC/hr
0
CFM
0
CFM
Subtotals for Structure:
%
0
CFM
0
%
1
CPM
1
CFM
10.2
NW -GIs -Atrium shgc-0.:33 0%S
16 0.310 21.4 342 25.6
0
409
Floor -21A-32 1 X 195.6
195.6 0.020 1.4 270 0.0
0
0
Subtotals for Structure:
1 040
0
410
Infil.: Win.: 0., aura.. 0.8
18 2.849 51 0.670
-18
1
AEC Excursion
Room Totals:
1,100
-18
469
I
t
3
F
i
j
by
E
\Plan 5062.rhv
Tuesday, February 18, 2014, 3:19 PM
Room Length:
1,663.8 ft.
System Number.
1
Room Width.
1.0 ft.
Zone Number,
1
Area,
1,664.0 sq.ft.
Supply Air.
211
CFM
Ceiling Height.
10.2 ft.
Supply Air Changes,
0.7
AC/hr
Volume.
16,915.6 cu.ft.
Req. dent. Clg.
0
CFM
Number of Registers:
3 -
Actual Winter Vent.:
0
CFM
Percent of Supply,:
0
%
Actual Summer Vent.:
0
CFM
Percent of Supply:
0
%
Actual Winter Infil.:
10
CFM
Actual Summer Infil.:
10
CFM
NW -Wall -Basement R11-9 12,7
12£3.9
0.051
3.7 47'2
0.1
0
9
8
10.2
NE -Wall -Basement R11-9 12.5
127.1
0.051
3.7 465
0.1
0
10.2
SE -Wali -Basement R11-9 5 X
50.8
0.051
3.7 186
0.1
0
3
10.2
NE -Wall -Basement R11-9 8.3 X
84.7
0.051
3.7 319
0.1
0
10.2
SE -Wall -Basement R11-9 20 X
203.4
8.651
3.7 744
0.1
0"
12
10.2
NE -Wall -Basement R11-9 29 X
294.9
0.051
3.7 1,079
0.1
0
18 I
10.2
SE -Wall -Basement R11-9 48.8
474.8
0.051
3.6 1,705
0.0
0
14
X 10.2
#
SW -Wall -Basement R11-9 18 X
167.1
0.051
3.6 595
0.0
0
3 I
I 10,2
I
NW -Wall -Basement R11-9 14.3
1457
0.051
3.7 533
0.1
0
9
X 10.2
SW -Wall -Basement R11-9 14.8
150.8
0.051
3.7 552
0,1
0
9 }
10.2
SE -Eels -Atrium shgc-0.33 O%S
16
0.310
21.4 342
30.8
0
492
SE -Cls -Atrium shgc-0.33 O%S
16
0.310
21.4 342
30.8
0
492
-Cls-Atrium shgc-0.33 0%S
16
0.310
21.4 342
30.8
0
492
Floor -21A-32_.._ 8
1663, 3
f?.020
1 - _ _ 2,2961-1
_ -. 0.0 _
t? _M .
_ _ _ 0
I
Subtotals for Structure:b
9,963
0
1,565
Infil.: Win.: 10.4, Sum.: 10.4
225
2.856 643
0.662
-225
149
AED Excursion:189
i
Room Totals:
10,606
-225
1,903
Y:\...\Pian 5062.rhv Tuesday, February 18, 2014, 3.19 PM
Room Length:
14.3
ft.
System Number:
1
0.7
Room Width:
17.2
ft.
Zane dumber:
1
4.5
Area.:
246.0
sq.ft.
Supply Air:
129
CFM
Ceiling Height:
9.1
ft.
Supply Air Changes:
3.5
AC/hr
Volume.
2,235.0
cu.ft.
Req. gent. Ig:
0
CFM h
Number of Registers:
2
SW -Cls -Atrium hgc-0x33 O%S
Actual Winter Vent.:
0
CFM
535
301
0
Percent of Supply.:
0
% 1
0.026 _ .
1.8 ..
_ _. 441...`
Actual Summer Vent.:
0
CPM i
Subtotals for Structure.
Percent of Supply:
0
%
0
2,100 9
Infil.. Win.: 19.2, Surn.: 19.2
Actual Winter Infil.:
19
CPM
1,189
0.663
416
Actual Summer Infil..:
19
C
CFM k
SE-Wall-12F-Osw 14.3 X 9.1
130.1
0,065
4.5
584
0.7
0
96
SW-Wall-12F-Osw 17.2 X 9.1
105.9
0.065
4.5
475
0.7
0
78 ;
SW -CSIs -Atrium shgc-0.33 O%S
12.5
0.310
21.4
267
30.7
0
384 E
SW- l -Atrium shgc-0.33 O%S
12.5
0.310
21.4
267
30.7
0
384 "
SW -Cls -Atrium hgc-0x33 O%S
25
0.310
21.4
535
301
0
768
l.f P-Ceil 165 38 246.1 wX 1 _._ _.
_ 246A
0.026 _ .
1.8 ..
_ _. 441...`
.
0..__
Subtotals for Structure.
3,153
0
2,100 9
Infil.. Win.: 19.2, Surn.: 19.2
416
2.857
1,189
0.663
416
276
AED Excursion
287
People 200 .laPt/oer, 230 senlper
mm . ...........,_
..
_,.
w __..
200 ..
_..230 ,
Room Totals.
4,342
-216
2,893
Y:1 ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM
Room Length:
484.3 ft.
System Number: '
1
Room Width:
1.0 ft.
Zone Number:
1
Area:
484.0 sq.ft.
Supply Air:
227
CFM
Ceiling Height:
9.1 ft.
Supply Air Changes:
3.1
AC/hr
Volume: `
4,809.0 cu.ft.
Reel. Vent. Clg:
0
CFM
+ Number of Registers:
2
Actual Winter Vent.:
0
CFM
?
percent of Supply.:
0
%
1
Actual Summer Vent.:
0
CFM
Percent of Supply:
0
%
f
Actual Winter lnfl.:
13
CFM
l
Actual Summer lnfil.:
13
CFM
NW-Wall-12F- sw 15.5 X 9.1
140.7
0.06 4.5 6 1
O.7'
O
1113
i SW-Wall-I2l=-Osw 14.9 X 9.1
54.8
0.065 4.5 246
0.7
0
40
SW-GIs-Atrium shgc-0.33 O%S
80
0.310 21.4 1,711
30.7;
0
2,459
Up-Ceil-16B- 8 484.3 X 1
484.3
0.026 1.8 _ 869
1.
_
0
_ 7
Subtotals for Structure.
3,457
0
3,181
lnfil... Wen.: 12.7, Sura... 12.7
276
2.856 787
0.664
-275
183
A Dxcuyrsion:
5{f0��j3
Equip Vy,__ ...,
1
jy
i
Room Totals.
4,244
-275
5,067
4
{
tit
4
Y.\ ...\plan 5062,rhv Tuesday, February 18, 2014, 3.19 PM
Room Length:
12.3
ft.
System Number:
Room Width
14.0
ft.
;done Number:
Area:
173.0
sq.ff:
Supply Air:
Ceiling Height:
9.1
.ft.
Supply Air Changes:
I Volume;
1,500.0
cu.ft.
Req, Vent. Clg:
k Number of Registers:
1
-112
Actual Winter Vent.:
Percent of Supply.:
Actual Summer Vent.:.
Percent of Supply:.
Actual Winter Infil.:
Actual ;summer Infil.:.
NW-Gls-Atrium srigc-0.33 0%
20 0.310 21.4 428 25,5
0
51
43
CFM
1.8
AC/hr
0
CFM
0
CFM
0
%
0
til=tv
0
%
5
CFM
5
CFM
NW-Gls-Atrium srigc-0.33 0%
20 0.310 21.4 428 25,5
0
51
P-Ceil-1 E3-38 172.7 X 1
172=_7 _ _ 0.028m 1.8 . 310 1.2
0
207
Subtotals for Structure:
1,150
0
785
Infil.. Win.. 5.2, Sum.. 5.2
112 2.858 320 0.881
-112
74
AF19 Excursion.
9
Room Totals.
1,470
-112
955
t
t
ti
FF
1
ti -.\ ...\Plan 5052.rhv Tuesday, February 18, 2014, 3:19 PM
Roam Length::
306.4 ft.
System Number:
1
Room Width: `
1.0 ;ft.
Zone dumber:
1
Area,:
306.0 sq ft.
Supply Air:
100
CFM
I
Ceiling Height:
9.1 ft.
Supply Air Changes:
3.6
AC/hr
Volume:
2,783.0 cu.ft.
Reg. Vent. Clg:
0
CFM
Number of Registers:
3
Actual Winter Vent.:
0
CFM
Percent of Supply.:
0
%
Actual Summer Vent.:
0
CFM
Percent of Supply:
0
%
i
Actual Winter Infil.:
19
CFM
Actual Summer Infil.:
19
CFM
W`WaII-12F0sw 14.3 X 9.1'
109.8
0.085.
'"4.5 492
0.7
O
F
81
SE -Wall -1 2F-Osw 14.3 X 9.1
130.1
0.065
4.5 584
0.7
0
9 €
SWWWall-12F-Osw 18 X 9.1
108.4
0,065
4.5 486
0.7
0
80
NW`Cis-Atrium hgc-0.33 O%S
20
0.310
21.4 428
25.6
0
511 1
SW -GIs -Atrium shgc-0.33 O%S
15
0.310
21.4 321
30.7
0
461 1
S -Cis -Atrium shgc-0.33 O%S
15
0.310
21.4 321
30.7
0
461
SW -GIs -Atrium hgc-0.33 O%S
25
0.310
21.4 535
30.7
0
768 �
ESP it 1 8 38 306.4 X 1
306.4
0.026
1.8 . _ 550
_ � 1.2
0
366
Subtotals for Structure:
3,717
0
2,824 1
Infil.: Win.: 19.5, Sum.: 19.5
423
2.856 1,209
0.661
-423
280
AE3 Excursion:
368
People: 200 l t/per, 235 sen/per
_ �1 .
_
_ _ . _
...
200 .
0
Room Totals:
1
4,926
-223
3,702
3
1
y(
}
j
�, ...m..„ .r._,._...,, ._.... ...m_ .............. .a... M...<.,.e........«_,..._a..e......._,....,_.
.,._..,._.............,...,..
.,. .m.,,.,w.,
..,...,..,.....,..........,e,....,.,............._.A.....,.,..._.._.,.,.... .,_.,..._.,..,..,.«..
.e..,....»....:e.,.,............._...»,.,,�.._...e...>..a,....._._...,....
.w,...e..
\ ...\Plan 5062.rhv Tuesday, February18, 2014, 3:19 PM
t.rdit4UIdUvI I IVIVU .
mg. at i; Y.
occurrences:
1
Room Length:
3.5
ft.
System Number:
1
Room Width:
5.5
ft.
Zane Number:
1
Area:
19.0
sq.ft. '
Supply Air:
5
CFM
1
Ceiling Height:
9.1
ft.
:supply Air Changes:
1.8
AC/hr
Volume:
175.3
cu.ft.
Reef. Vent. Clg:
0
CFM
€ Number of registers:
1
Actual Winter Vent.:
0
CFM
Percent of Supply.:
0
%
Actual Summer Vent..
0
CFM
Percent of Supply:
0
%
Actual Winter Infil.:
1
CFM
j
I
Actual Summer Infil.:
1
CFM
�SE-Wall- �12F-�O 3.5�X9.1
31.8
"0,06
,5 113 0.7
�O�23
UP Ceil_r1.613_8819.2 X 1"
_ 19.2
M6 1� , . . 35
w .
Subtotals for Structure:
173
0
_
46
Infil.: Win.: 1., Sum.: 1.5
32
2.863 91 0.661
-32
21
AFLJ Excursion:
7 t
Roam Totals:
250
-32 74
s
s
i
i
i
f
{
E
1
E
i
1
z
1
i
I
Z
i
P
I
i
�:1...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM
Room Length:
291.2
'ft.
System Number:
1
Roam Width:
1.0
ft.
;done Number:
1
3
Area:
291.0
sq.ft.
Supply Air:
49
CFM
Ceiling Height:
9.1
ft.
Supply Air Changes:
1.1
AC/hr
Volume:
2,645.01
cu.ft.
Req. Vent. Clg:
9
CFM
Number of Registers:
2
Actual Winter Vent.:
0
CFM
Percent of Supply.:
0
%
Actual Summer Vent.:
0
CFM
Percent of Supply:
9
%
Actual Winter Infil.:
5
CFM
Actual Summer Infil.:
5
CFM
3
S-Wall-12FYfts 13 X 9.1
SF -tats -Atrium shgc- t.33 O%S
1
C?2
8
g.gC 4»5 458
6.319 21.4 171
t.7
X8
fi
6
3
75
245 1
SF -GIs -Atrium hgc-0.33 6%S
8
0.310 21.4 171
30.8
9
246
UP-Cei1-1613-38 291.2 X 1
291.2
0.026 _ m 1.8 _ 522
1. _
._,
0.. A
348
Subtotals for Structure:
1,322
9
915
Infil.: Win.: 5.4, Sura.: 5.4
118
2.855 337
0.661
-118
78
AED Excursion-. ,. _
_ _.
_
_ .. , ._ _ ._ _
s. _� _ �_� _
�.
�_ 109
Room Totals:
1,659
-118
1,1012 ,
r
i
i
3
i
f
i
Y:i ...\Plan 5 62.rhv Tuesday, February 18, 2014, 3:19 PM
Room Length:
7.3
ft.
System Number:
1
{
Room Width:
12.7
ft.
Zane Number:
1
Area:
93.0
sq.ft.
Supply Air:
13
CFM
Ceiling Height.
9.1
ft.
Supply Air Changes.
0.9
AC/hr
Volume.
844,0
cu.ft.
Req. Vent. Clg.
0
CFM
Number of Registers:
1
Actual Winter Vent.:
0
CFM
Percent of Supply..
0
%
Actual Summer Vent.:
0
CFM
Percent of Supply:
0
%
Actual Winter Infil.:
3
CFM
�SE-Wa�11-12F-�Osw �X9.
Actual Summer Infil.:
�0.0�65�4.5�200
3
CFM
�O�49�
j
E
7.
U -Cell-1613-38 92.9 X 1 '
_,,..,.. ..... ,_..,
66.E
, ...._. 92.9
0.7
0.026 1.8 167 1;2
0 .........
f
111
... ._.
Subtotals for Structure:
466
0
160
Infil.: Win.: 3 1, Sum.: 3.1
67
2.866 190 0.661
-67
44
AED Excursion:
m . A _a _
.... ....
e...._--.
22
Roam Totals:
666
-67
226
r
x
r
i
i
I
► :\ ..,\Plan 6062.rhv Tuesday, February 18, 2014, 3.19 PM
Calculation Mode: � Htg. & c1g.
Occurrences:
1
Room Length:
195.8 ft.
System Number:
1
E
Room Width:
1.0 ft.
Zone Number:
1
Area:
196.0 sq.ft.
Supply Air:
70
CFM
Ceiling Height:
9.1 ft.
Supply Air Changes:
2.4
AC/hr
Volume:
1,778.0 cu.ft.
Req. Vent. lg.
0
CFM
Number of Registers:
2
Actual Winter Vent..
0
CFM
Percent of Supply.:
0
%
Actual Summer Vent.:
0
CFM
Percent of Supply:
0
%
Actual Winter Infil.:
12
CFM
Actual Summer Infil.:
12
CFM
NE-Wa11-12F-0sw 16,5 X 9.1
149.8
C?.ilf>
4. i2
i1.7'
C)
110
€ SE-Wall-12FWOsw 11.5 X 9.1
84.4
OM5
4.5 378
O}
0
62
SE -Cls -Atrium hgc-0.33 O%S
20
0.310
21.4 428
30.8
0
615
UP-Ceil-16S-38 195.8 X 1 e, _
105.8
0.028_rt
w 1•8 .. 351
n 1.2 e
0 e
234
Subtotals for Structure.
1,830
0
1,021
Infil.. Win.. 11.7, Sum.. 11.7
254
2.856 726
0,661
-254
168
AFD Excursion.
156
i' cp1 l Vp r, 0s niper__.w.��,......e..
.._ _a_....
_�
�.:._ �.. :_a. .,.4 .....w..
,. .__.�._
_.,.:2C)0_..._„��
0
Room Totals:
I
5
2,556
-4
1,575
I
i
i
I
3
I
I
I
I
i
:\ ...\Plan 506,rhv Tuesday, February' 18, 2014, 3:19 PM
# Room Length:
8.3
ft.
System Number
1
Rohm Width.
5.3
ft.
Zone Number:
1
€ Area:
44.0
sq.ft.
Supply Air.
3
CFM
Ceiling Height:
9.1
ft.
Supply Air Changes:
0.4
AC/hr
Volume:
403.0
cu.fta
Reef. Vent. Clg:
0
CFM
Dumber sof Registers:
1
Actual Winter tient.::
0
CFM
Percent of Supply.:
0
%
Actual Summer Vent.:
0
CFM
Percent of Supply:
0
%
Actual Winter lnfil.:
0
CFM
{
I
Actual Summer lnfil.:
0
CFM
z
s
�UP-Ce116P-�il-�3844.4
4,4
0.0261.8
�e 80
1.2
0 53
Subtotals for Structure:
80
0 rz3
lnfil.: Win.: 0.0, Sum.: 0.0
0
0 0
0
0 0
AEC Excursion:
6.
Rod Totals:
80
0 9
F
I
:
s
F
i
F
{
t
I
}}
#
i
I
#
Y:t ...Oan 5062.rhv
Tuesday, February 18, 2014, 3:19 PM
Room Length:
7.5
ft.
System Number
1
Roam Width:
12.5
ft.
Zane Number:
1
Area:
94.0
sq.ft.
Supply Air:
29
CFM
Ceiling eight
9.1
ft.
Supply Air Changes:
2.0
AC/hr
Volume:
852.0
cuft
Req. Vent. Clg:
0
CFM
Number of Roisters:
1
Actual Winter Vent.:
0
CFM
Percent of Supply.:
0
%
Actual rummer Vent.:
0
CFM
Percent of supply.
0
%
Actual Winter Infil..•
5
CFM
Actual Summer Infl.:
5
CFM
NE -Door -Rear Entry Door 2.7 X 21.4 0.357 24.6 526 7.9 0 168
UP-Ceila16B-38 93.8 X 1_ 93.8 O.U26 _ _ _ 1,8 168111111111 1-1111-11111111 r _ 1.2 �0 � 112
Subtotals for Structure: 1,107 0 X48
Infil.: Win.: 5.2, Sum.: 5.2 114 2.855 324 0.661 -113 75
Excursion: 7
AED
._..r.__._._.. ...
_.....-
Room Totals: 1,431 -113 470
i
t
I
i
E
I
i
}
i
t
t
i
}
t
Y:\ ...!Plan 506.rhv Tuesday, February 18, 2014, 3:19 PM
} Roam Length:
179.3
ft. _
System Number.
1
= Room Width:
1.0
ft.
Zone Number:
1
Area:
179.0
sgxft.
Supply Air.
54
CFM
Ceiling Height:
9.1
ft.
Supply Air Changes:
2,0
AC/hr
d
Volume:
1,628.0
cuxft.
Reel. Vent. Clg:
0
CFM
Number of Registers:
1
Actual Winter Vent.:
0
CFM
Percent of Supply.:
0%
Actual Summer Vent.:
0
CFM
Percent of Supply:
0
%
Actual Winter lnfil.:
5
CFM
Actual Summer lnfil.:
5
CFM
y
r NW -Wall -12F -O 11:7 x 9e1
�0.0�65�4.5� 0,7
Y
�
NW-Gis-Atrium shgc-0.33 O%S
20
0310 21.4 428 25.6
0
al l
ISP-Ceil-1S-3 170.3 X 1
179.3
0.026_. 1.8 322 1.2
0
214
Subtotals for Structure:
1,136
0
768
lnfil.: Win., 4.9, Sum... 4.9
106
2.850 303 0.661
-106
70 t
AFD Excursion
120 z
Ppl 200 it%6r, 230 snCrer _
w .m. . _
_.
_� ..w��. _ �, _ _ v �. , ,
206.. ------------
230_
boom Totals:
1,439
94
1,208 ?
I
x
i
i
i
l
Y:\ ...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM
Room Length:
60.4
'ft.
System Number: ` `
1
Room Width:
1.0
ft.
Zone Number:
1
z
Area:
60.0
sq -ft.
Supply Air:
19
CFM
Ceiling sleight:
9.1
ft.
Supply Air Changes:
2.1
AG/hr
Volume:
549.0
cu.ft.
Req. Vent. Clg:
0
CFM
Number of Registers:
1
Actual Winter Vent.:
0
CFM
Percent of Supply.:
0
%
?
Actual Summer Vent.:
0
CFM
i
Percent of Supply:
0
%
Actual Winter Infil.:
4
CFM
Actual Summer Infil.:
4
CFM
s
NW -Wall -12F -Oso 9.2 9;1
75.3
0.065 4.5 338'
O.7
0
55
NW -Cls -Atrium shgc-0:33 O%S
8
0.310 21.4 171
25.6
0
205
UP-Ceil-16R- 8 60.4 X 1
60.4
0.026 1.8 106
1.2
0
72 `
Subtotals for Structure:
617
0
332
Infil.: Win.: 3.8, Sum.: 3.8
83
2.858 238
0.661
-83
55
AED Excursion:
43
Room Totals:
855
-83
430
i
�
1 f
s
Y:\ ...\Plan 506 .rhv Tuesday, February 18, 2014, 3:19 PM
Room Length:
9.2
ft.
System Number:
1
Room Width:
5.7
ft.
Zane Number:
1
Area:
52.0
s .ft.
Supply Air:
3
CFM
Ceiling Height:
9.1
ft.
Supply Air Changes:
0.4
AC/hr
Volume:
472.0
cu.ft.
Reel. Vent.,Clg:
9
CFM
Number of Registers.
1
Actual Winter Vent.:
0
CFM
Percent of Supply.:
9
%
Actual Summer Vent.:
0
CFM
Percent of Supply:
0
%
Actual Winter Infil.:
9
CFM
Actual Summer Infil.:
0
CFM
(:\ ...\Plan 5062.rhv Tuesday, February 18, 2314, 3:19 PM
Room Length:
149.9 ft.
System Number:
Room Width:
1.0 ft.
Zone Number:
Area:
150.0 sq.ft.
Supply Air:
88
CFM
Ceiling Height:
9.1 ft.
Supply Air Changes:
3.9
AC/hr
Volume:
1,362.0 cuft
Req. Vent. Clg:
0
CFM
Number of Registers:
2
Actual Winter Vent.:
0
CFM
Percent of Supply.:
0
%
Actual Summer Vent.:
0
CFM
Percent of Supply:
0
%
Actual Winter lnfil.-.
12
CFM
Actual Summer Infil.:
12
CFM
64
NE -Wall -1 2F-Osw 12.7 X 9.1
95
0M5
4.5 426
OY
0
70
SE -Wall- I 2F-Osw 5 X 9. 1
45,8
0.065
4.5 205
0.7
0
34
NW -GIs -Atrium shgc-0.33 O%S
20
0.310
21.4 428
25.6
0
511
NF -GIs -Atrium shgc-0.33 O%S
20
0.310
21.4 428
25,6
0
511
UP-Cei1-1613-38 149.9 X 1
149.9 ............
0.026
1.8 269
1.2
0
....... . .......... ... .. . ........
179
... .... - I
Subtotals for Structure:
2,148
0
1,369
Infil.: Win.: 12.4, Sum.: 12.4
268
2.8561, 766
0.664
-268
178
AFD Excursion:
196
Pepat/ r n
--je: 200,1 pe 230,.se
1
------------- ....... ....
200
230
Room Totals:
2,914
-68
1,973
(:\ ... \Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM
Room Length:
93.1
ft.
System Number:
1
0,7
Room Width:
1.8
;ft.
Zone Number:
1
11.1
Area;
93.0
sq.ft.
Supply Air:
38
CFM
Ceiling Height:
Volume:
9.1
ft.
Supply Air Changes.
2.7
AC/hr s
l Ceil 16S 38 93 1 1
846.0
cu.ft,
Reef. Vent. Clg:
0
CFM
Number of registers:
1
Subtotals for Structure:
Actual Winter Vent.:
0
CFM i
1,356
_m.
0
Percent of Supply..
9
%
2.855
527
Actual Summer Vent.:
0
CFM
Ai„t Fxcur�on�_.., .... ....
_..._ , _ :_.„._ ..._,_..._
.. .. ...........
Percent of Supply:
Q
%
Room Totals.
Actual Winter lnfil.:
9
CFM ?
_ ,.....
1,885
-184
Actual Summer (nfil.:
9
CFM
i `-vvw-1 zt--osw 12 x 9:1
109
0.065
4.5
439
0,7
Ci
80
k NE -boor -R6.2 floor 3 X 8
24
03.161
11.1
267
3.5
9
85
NF -CSIs -Atrium shgc-0. 3 O%S
12
0310
21.4
257
25.5
0
307 :
l Ceil 16S 38 93 1 1
93 1
026
1 8
1 ... ..__._
_._ _ _
µ.
i
Subtotals for Structure:
1,356
_m.
0
M
612 '
lnf l.; Win.: 8.5, Sum.: 8.5
185
2.855
527
0,661
-184
122
Ai„t Fxcur�on�_.., .... ....
_..._ , _ :_.„._ ..._,_..._
.. .. ...........
_.
Room Totals.
. , ,. _.;,._
_ ,.....
1,885
-184
..� .,.,. 3
815
I
gI
s
Y:\ ...1f'l n 5062.rhv Tuesday, February 18, 2014, 3:19 PM
Room Length:
276.2
ft.
System Number:
1
327
Room Width:
1.0
ft.
Zone dumber:
1
1
Area.
276,0
sq.ft.
Supply Air:
22
CFM C
Gelling Height:
9.1
ft.
Supply Air Changes:
6,5
AC/hr
Volume:
2,509.0
cu.ft.
Req. Vent. Clg:
0
CFM
Number of Registers:
1
Actual Winter Vent.:
0
CPM
Percent of Supply.:
6
°lam r
Actual Sumner Vent.:
9
CPM
Percent of Supply:
0
%
Actual Winter Infil.:
3
CFM
Actual Summer lnfil::
3
CF f
t!F'-C ii 6 7f..X 1...._.. �.
..�`; 27£ ..Mat?mC}2�i...:.ry .� 1 .� _.�. 9 _. _ _ .' �,
_ . `.
s
Subtotals for Structure:
327
0
334
lnf l.: Win.: 3.4, Sum.: 3.4
74 2.361 212 M61
-74
49
AEC} Excursion:4
..
Room Totals.
1,939
-74
431
t
f
}
i
E
G
i
1
,I\ \Plan 506 .rhv Tuesday, February 16, 2614, 3:19 PM
Net Required: 2.05 108%/-8% 24 583 -1,865
Actual:. 2.75 100%/0% 33,000 0
Type:
Model:
Indoor Model:
Brand:
Description:
Efficiency:
Sound:
Capacity:
Sensible Capacity:
Latent Capacity:
AMRI Reference No.:
Gas
Furnace
U
Natural ni
lq
" iS 2BO8 'oiU20
Carrier
Natural Gas or Propane
S2.1 AFUE
t, • •
Standard Air Conditioner
' 4" AC: '
**
13 `* PURON °!
13 SEER
33000
33,000 Btuh
0 Btuh
6395468
Y:i ...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM
I Rec Room
839
4,582
91
7,7
1,104
-90
61.
91
Bath 4
52
284
6
3
9
-7
0,
6
3 BR 4
196
1,100
22
6
469
-18
26 `
22
4 Unf basement
1,664
10,606
211
8,8,8
1,903
-225
106
211
5 Great Room
246
4,342
86
7,7
2,893
-216
161
129
6 Kitchen/Nook
484
4,244
85
8,8
5,067
-275
282
227
7 Dining
173
1,470
29
7
- 955
-112
53
43
8 Master BR
306
4,926
98
7,7,7
- 3,702
-223
206
166
WC
19
269
5
3
- 74
-32
4
5
10 Master Beth
291
1,659
33
5,5
- 1,102
-118
61
49
11 WIC
93
656
13
4
- 226
-67
13
13
12 BR 2
196
2,556
51
6,6
- 1,575
-54
88
70
13 Bath 2
44
80
2
3
- 59
0
14 Laundry
94
1,431
29
4
470
-.113
26
29
15 BR 3
179
1,439
29
7
- 1,208
94
67
54
16 Bath 3
60
855
17
4
- 430
-83.
24
19
17 PDR
52
93
2
3
69
0
4
3
18 Study
150
2,914
58
6,6
1,973
-68
110
88
19 Entry
93
1,885
38
5
- 815
-184
45
38
20 I1ell. _
26 .e._...
1,039. _
, ...,1 _ ..
r. .,
481
�' ,...
27
22
-----
-------- - -
Humidification
Humidificati
1,797
--
Sys em 1 total
p
5,507 ...48,227
925_24,583.
1,8615._
._ "1,367.
'x,.,1 .
System 1 Main Trunk
Size:
25x12
in.
Velocity:
527
ft./min
Loss per 100 ft.:
0.022
in.wg
Duct size results above are from Manual
D Ductsize.
Runout duct velocities are not printed with duct
size results from Manual D Ductsle
since they
can very within
the room. See the Manual D Ductslze report for duct velocities
and other data.
Net Required: 2.05 108%/-8% 24 583 -1,865
Actual:. 2.75 100%/0% 33,000 0
Type:
Model:
Indoor Model:
Brand:
Description:
Efficiency:
Sound:
Capacity:
Sensible Capacity:
Latent Capacity:
AMRI Reference No.:
Gas
Furnace
U
Natural ni
lq
" iS 2BO8 'oiU20
Carrier
Natural Gas or Propane
S2.1 AFUE
t, • •
Standard Air Conditioner
' 4" AC: '
**
13 `* PURON °!
13 SEER
33000
33,000 Btuh
0 Btuh
6395468
Y:i ...\Plan 5062.rhv Tuesday, February 18, 2014, 3:19 PM
#.. � # MIM # �. # M!' • # #
ration.
building
ct Reports !€
System 1
Fast
1,330
23,909
9010
southeast
1,259
22,646
1350
south
Zone 1.:
19,345
1800
Southwest
1,193
21,4610
2250
West
1,193
21,448
1 Rec Room
*91
91
91
91
91
91
91
91
717
2 Rath 4
*6
6
6
6
6
6
6
6
3
3 RR 4
26
22
25
33
28
22
28
*33
6
4 Unf basement
*211
211
211
211
211
211
211
211
6,6,6 i
5 Great Room
161
*181
140
91
131
169
145
119
7,7 i
6 Kitchen/Nock
282
*315
247
168
231
278
254
198
8,8 I
7 Dining
53
36
51
60
54
40
54
*60
7
8 baster SR
206
*211
181
138
175
194
191
159
7,7,7
9 WC
*5
5
5
5
5
5
5
5
3
10 Master Rath
*61
50
59
60
51
38
51
60
5,5
11 WIC
*13
13
13
13
13
13
13
13
4
12 BR 2
*88
73
84
85
73
57
73
85
646
13 Rath 2
3
*3
3
3
3
3
3
3
3 I
14 Laundry
*29
29
29
29
29
29
29
29
4
15 RR 3
67
51
65
72
66
52
66
*72
7
16 Rath 3
24
17
23
26
24
18
24
*26
4
17 PDR
4
*4
4
3
3
3
3
3
3 r
18 study
110
108
*112
102
110
102
105
95
6,6
19 Entry
45
*54
47
38
44
48
41
38
5
20 Nall
27
*27
26
24
24
24
24
24
5 I
* Indicates highest CFM of all rotations.
450
Fast
1,330
23,909
9010
southeast
1,259
22,646
1350
south
1,076
19,345
1800
Southwest
1,193
21,4610
2250
West
1,193
21,448
2700
Northwest
1,246
22,413
3150
North
1,147
20,631
-1,865
1.61
-1,865
1.79
-1,865
1.79 l
-1,865
1.87
-1,865
1.72
3
Y.\ ...\Plan 5062.rhv Tuesday, February` 18, 2014,'3:19 P
Building Rotation Tonnage I
t
i
YA ,..\Pian 5062.rhv Tuesday, February 13, 2014, 3:13 PM
(A ..APlan 566 .rhv Tuesday, February 18, 2014, 3:19 PM
m
Building
Rotation Hourly Net Gain s
i
............................................. s
28,000 ,
F
}ky.27,000f—
SC
.... ........ ....... .......
... ..................... .. , .. ., ..:, .... .. ..... ...... 1C , <, .,.....
� 26,090 .......... . ..... ... ....... ........................
aFP.........., ,, ..,......,..,.. ...:.... ..,......, CC
�
C..........:
J
1
26,000 ...................«,..,<....,,....,,.....
.. «....
3p
� 24,000 i.. ....... ........ ....
i23,000.. ..r,..:....,.,:u.. .... ... ..........«......
I �
x
€i.......
22,000 ......:...... .. .........................
.:......................:.. .:........
21,0001-11-1-11 1
�y.dr..
�.... .. ..
20,00900 . ..... ... ..... ..
.... ........ ..... ..,.,, ... ...., .. .,. ..... , ...»... .. ,.
19,000.
1 �
C
k
' d 4r0.0.AAUU��ttfan
6GG M
4 16,0001 ... ...... .. ... ... ..... ..... .... .. .. ......
t
.. .... .. .... ...............«......,..,. ,.,..».., ..,...... .., ., ,.. «..,..
15,0001--l'
,.... .....: ,.. ,., .., .., ..,... .... .., ..,..,
{
. .„....---
8 am 9 am loam 11 am
12 pm i pm 2 m 3 rn 4 m 5pm f m 7 pm {
Time of clay
Front door faces Northeast
...°. Frontdoorfaces East
Front door faces Southeast
P « Front door faces South
FrontdoortacesSouthwest
Frontdoorfaces West
Frontdoorfaces Northwest
Frontdoorfaces North
4
i
i
(A ..APlan 566 .rhv Tuesday, February 18, 2014, 3:19 PM
Manual S, D, Standard Pacific, Fireside Plan 5062
Furnace = Carrier Madel 50SC2BO8OS21--20 (80000 BTU)
Air Conditioner = Carrier Madel CA13NA036****(A,B)) (3 Ton)
Evaporator Coil = Carrier Model C PV*4221AL*+TDR (3.5 Ton)
« «:
Number of active trunks.
31
!umber of active rano :
30
Motel runout outlet air ow:
1,21
Main trunk airflow:
1,098
Largest trunk diameter:
13.6 Int 100
Largest runout diameter:
8
SPECIFICATIONS
t
t
t
M
�
� '� i
• ! t �e�.
A" a
. t't� € rRf ti" t 1 # *€'KR#
t
•i,l
.� .dii +Pl�
saw
Detailed Cooling Capacities
{
p
'I s cs
wit
2,29 S.
o
124;
ac °
91.ta
G 59 O
`
off
•5
j V
. .. .. ..... ... t
I
i
p
f
Vi
CL iR3 'Cd
C)
40,
iQ
. .. .. ..... ... t
I
i
p
CL iR3 'Cd
C)
40,
. .. .. ..... ... t
I
z
*
•
NOTES OF
mEt
r
CONCERN:
*
..
*
LL
*
�
t
?>
—4 0 ou0
`
..
*'
Q.
%
*
0
W
GX
..
SETBACK
mUD
DIMENSIONS -
0
m
rn
0 S
*
0
M
u d
A P
« 00
c>
;�._. 00
27. 4Z
Po IQ) 89`x' 48"W 13. 6' T_ `
m 6° �
22.0' T 72.0' OV MO' at
3%
c� 4v 10% i
c�i� t;
72.5 a II
ca,. bra 70.
ca
OD
I q �xo 90
66.6 ?. _ o C!9 +
N as
PD C
i ,.: ox
aw p.
.`Q � 44.3 t!7
N
5.0 ,7t
.3'
c+
N) co 0 01)
ria ii 7 .0'
6 - t
I x
d' Hca,c y
r
Q
}
•DE
CX7
r- b
0-4
0
4%
*
•
•
r
*
..
*
LL
*
�
t
?>
—4 0 ou0
..
81-
Q.
%
*
0
W
GX
..
M
u d
A P
« 00
c>
;�._. 00
27. 4Z
Po IQ) 89`x' 48"W 13. 6' T_ `
m 6° �
22.0' T 72.0' OV MO' at
3%
c� 4v 10% i
c�i� t;
72.5 a II
ca,. bra 70.
ca
OD
I q �xo 90
66.6 ?. _ o C!9 +
N as
PD C
i ,.: ox
aw p.
.`Q � 44.3 t!7
N
5.0 ,7t
.3'
c+
N) co 0 01)
ria ii 7 .0'
6 - t
I x
d' Hca,c y
r
Q
}
•DE
CX7
r- b
0-4
0
4%
*
•
•
r
*
..
UD
�
t
?>
—4 0 ou0
M
u d
A P
« 00
c>
;�._. 00
27. 4Z
Po IQ) 89`x' 48"W 13. 6' T_ `
m 6° �
22.0' T 72.0' OV MO' at
3%
c� 4v 10% i
c�i� t;
72.5 a II
ca,. bra 70.
ca
OD
I q �xo 90
66.6 ?. _ o C!9 +
N as
PD C
i ,.: ox
aw p.
.`Q � 44.3 t!7
N
5.0 ,7t
.3'
c+
N) co 0 01)
ria ii 7 .0'
6 - t
I x
d' Hca,c y
r
Q
}
•DE
CX7
r- b
0-4
0
4%
0
r
..
UD
?>
—4 0 ou0
..
81-
Q.
%
z p
0
W
GX
..
A U)
mUD
0
m
rn
0 S
0
City of
W3.6atR I d C
,,,�g COMMUNny DEVELOPMENT
City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033-8001 P: 303,235.2846 F: 301235,2857
March 20, 2014
OFFICIAL ADDRESS NOTIFICA
Z2IR!EAjMNMP CODE CORRECTION
NOTIFICATION is hereby given that the following address has been assigned to the property/properties as
indicated below:
PROPERTY OWNER(S): Standard PaciFic of Colorado Inc. A Delaware Ca ration
OLD ADDRESS: None
'90 abor Cr.
Wheat Ri d e Co '0033
'0
NEW ADDRESS:
3 "0 't'ab �
or Ct.
80033
Block 1_ Lo t25
3870 ab
I or Ct.
80033
033
3 60 1, ab
8 or Ct
Ile t Ri e C
W 0�810033
80033
3 5 Ta b or
8 0 T or Cr. Ct
W heat R i C
e 081
Blac o
'oc t 2 8
Block 1 -Lor 6
3801 Taft Ct.
Wheat Rtd e C{ 3
3830 T abor Ct.
Tab
block l _ I of
3819 `Taft Ct,
Wheat I2id e CC) 3
Black 1 Lor 9
3829 Taff Ct.
Wheat Rzd CC 3
Black t -Lot 10
3839 "Taft Ct.
Wear Rid e CC? 33
Stock l _Lot 11
384 Tafr Ct.
Wheat Rid e C) 33
Black 1 -Lor 12
38E9 Tafil Ct.
Wheat laid >e C( 33
33
Block I Lot t4 3889 Taft Ct.
Wheat Rid e CCU 33
'oc "o'
'90 abor Cr.
Wheat Ri d e Co '0033
'0
Block I - Lot 4
3 "0 't'ab �
or Ct.
W heat: e
R id 80033
Block 1_ Lo t25
3870 ab
I or Ct.
Wheat Ri e 0 80033
C
B l ack 1 Lot
26
3 60 1, ab
8 or Ct
Ile t Ri e C
W 0�810033
S to c k Lot .1
1 7
3 5 Ta b or
8 0 T or Cr. Ct
W heat R i C
e 081
Blac o
'oc t 2 8
384 Ta b
0 or Ct'
t R
ea 80 0
0033
d e �Q�
: Mac k 2
I -ot 9
3830 T abor Ct.
Tab
i Co
hea R �e 33
�( 8 �
�ock I Lot 30
38 0 or Ct
Wheat Co
e
R id 80�033
3
Black 2 - Ilot 3 383E `Taft Ct. Wheat. Rid e CCU 80033
Black 2 - Lat 4 3848 Taft Ct. Wheat Rid e fC} 3
3
33
WWWA-Wheatridgexo.us
I 1] IM1 4 JIM I I I 101
(Block l,ot 1 2 3871 Tabor Q. Wheat Rid
(Block 2 – Lot 13) 3861 Tabor Ct.,Wheat Ridge, co 8o033
Block 2 -• -Lot 14 3851 Taber Ct. Wheat Rid e CC) 80033
(Block 2 -.- Lot 15113841 Tabor Ct,,Wheat Ridg cO 80033
fRIA01- I – T tit I Al 'A R I I 'rnl nr Of 1X71-4 DA,.- f^t onlill
SUIRDIVISION: Doud Overlook Subdivision aka Fireside at Youn field Subdivision
LOT(S): KEY:
SECTION: — JEFFERSON COUNTY RECEPTION #: 2013143668
9mmmusm
NOTES: This is a courtesy notification,
AUTHORIZED BY. DATE:
JUL-11timu
NOTE: Please notify all other parties concerned.
ADDRESS MAP UPDATED BY: DATE:
R69W 601
ALUM. PPE W/ 3 -1/4 GRASS CAR
EO
STAMP LS 13212' N RANK 8O%
PONT 14109
N-708326.7466 E- 1025512566
T35, P.2'
I
I
I
I
1
I
i
I
I
I
I
I�
i�
1
I,
M
la
IY�
IW
I
I
LOT 11
3819
0710
38M
P p TV
s s O
11858 11842 11828
NEST 39TH PLACE
0 2
1871
11851
RP
11831
G
2
11811
•
0
0
o
s
398
H.O.A.
C
3881
LOT 7
LOT 12
3884
3871
LOT 6
LANDSCAPING
3872
LOT 13
3881
LOT 5
C
3550
LOT 14
I
3851
3821
LOT 4
3848
LOT 15
3841
LOT 3
3836
1
<\ 1
0
LOT 22
11810
TRACT 8
E. 1/4 CORO" SEC. 20 T35, R69W 6TH P.Y.
S AIW. i'Pf W/ 3 !BASS CAP
l STAIIREEI ,313=13- N RAHOE E01 05310 ADDRESS PLAT
PONT 14209 11212' N 9 RA" 0.1 a•0
DOUD OVERLOOK SUBDIVISION
FILING NO. 2
BEING A REPLAT OF A PORTION OF DOUD OVERLOOK SUBDIVISION,
--� LOCATED IN THE WEST HALF OF THE SOUTHEAST QUARTER OF THE
SOUTHEAST QUARTER OF SECTION 20 AND THE WEST HALF THE
NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 29,
`s TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN,
I CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO
48 LOTS, 5 TRACTS & PUBLIC R.O.W. — 14.872 ACRES
I
1
r
1
LOT 23
3890 1
rI
�1
I
TRACT
USE
I
A
1
HO.A
LOT 16
3831
1
H.O.A.
C
t UTUTE3
LOT if
D
UTRITES DRAINAGE k EYEROENCY ACCESS
LOT 2
E
LANDSCAPING
N.O.A.
TRACT C 3889.5
LOT 14
C
3m
I
3824
3821
LOT 24
3880
h
LOT 25
3870 M
I
LOT 26
3880
LOT 27
3850
LOT 28
3840
LOT 29
3830
1
* I LOT 17
- -
- - * I
j I 1 3812 11831 O
M LOT 8 LOT 1 _ LOT 30
MI 3819 O 11871 3820 1
C I y8T11 PU►_�� POINT a
T LS ,ea7
_r LOT 7 w
-' TW •1RACT 0 LOT 31 + Lr
11820 t — 'a UN v K I?
3610
BRASS CAP
y1p 11880 c
r�oR7risioo 1331:• N RANK NI2 I 11890 11880
1 N- 7056727126 E- 1025618715 I 3801 W N O 3800.5 1RACT
SE 1/4 SEC. 20�
CAP
1 0 of ��` `� 1M►Tf �—
_—J DD05TM0 \ I I2'
LIB
I N I I
1
I
I
IR
TRACT USE TABLE
TRACT
USE
OWNER
A
LANDSCAPING
HO.A
8
DETEMI110H POND k VTMUTES
H.O.A.
C
t UTUTE3
H.O.A.
D
UTRITES DRAINAGE k EYEROENCY ACCESS
H.O.A.
E
LANDSCAPING
N.O.A.
1 N N.O.A. -HOME OWNERS ASSOCIATION
1�
I
I
I
IEOE10
1 Nlocx ,RrLR
SICWaR COINER
R4W. RMT -OF -MY
"ammy Lm
LOT LINE
0057N0 PLATS
rz:71cm uw
ROAD O911ER Lm
I x
I
1
-4 POINT Of OMSV ICDIENT
BE CORRNf SEC 20
TM. RRf 6TH P.Y.
AWL PPE W/ 3-1/4 BRASS CAP
STATED. %S 13512' N RANK BOX
PONT ism — —
N-705701.5458 E.1052301675
I
I— 'SCALE: 1" - 60'
CPI Vry.AL tPAOM: _:..LI
DEVELOPER ENGINEER \SURVEYOR
rlr`■rsn.�6
*"DAIQDPACtfjcHomjs CA RROLL& LA NGE- MA N HARD
•/•RV6,Nro anLelA1►a aoYRWPn V
A .P. a •et1`..- ��ira: �WriWR.i...�ow1•
LOT 16
i LOT 17 11874
' 1182'0
LOT 16
{ I 3901
I 11900
I
I
LOT 15
V
3899
1
1
I
TRACT C 3889.5
LOT 14
1
I
3WO
I
f
LOT 13
j
3879
LOT 12
i
� � "�
d
3889
I