Loading...
HomeMy WebLinkAbout3839 Taft Courti CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: �- ` Yom' cr ( C L\ Job Address: J �� ;� - 4 Kt f-- Permit Number: 7 Ll No one available for inspection: Time - AM/PM Re -Inspection required: Yes -No When corrections have been made, cafi for re -inspection at 303-234-5933 Date: )' 1 1 Inspector: rr�` DO NOT REMOVE THIS NOTICE City of V`lheat j�idge COMMUNrFy DrVEt.OPMENT City of Wheat Ridge Municipal Building 7500 W. 29" Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2855 F: 303.237.8929 Permit Extension Request Form Permits expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days may be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. Please complete this form in its entirety and submit to the Building Division at permitsgci.wheatridge.co.us or fax to 303-237-8929. Party requesting permit extension: C`� (tir L 0 �'1�12c- R t7}.- Permit # 019 :r Property Address: Phone # ro `� Z -U ` Email Address: r✓D n^(-C_&P1 A < (V)h Reason for extension request: C Number of days requested: ( U Printed Name: Signature: Date: 'Zg—t For office use only This request hasbeen: ` Approved ❑/ Denied Extended until: Approved b}��"� r 9C tin ✓ 1' Q,91 -Date: '3 / wir w.ci.wheatridge.eo.us r__ City of Wheat Ridge Residential Mechanic PERMIT - 201702846 PERMIT NO: 201702846 ISSUED: 06/29/2017 JOB ADDRESS: 3839 Taft CT EXPIRES: 06/29/2018 JOB DESCRIPTION: Install new gas line from meter to firepit and grill; 90 ft of 1 in poly in trench 2/tracer wire to 150K firepit; tee off and install 10 ft of 3/4 in. poly to 60K grill *** CONTACTS *** OWNER (303)466-4206 SILLIMAN SHAUN SUB (303)466-4206 Greg Fanger 017986 The Gas Connection *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 2,355.00 FEES Total Valuation 0.00 Use Tax 49.46 Permit Fee 93.35 ** TOTAL ** 142.81 *** COMMENTS *** *** CONDITIONS *** Work shall comply with 2012 IRC & 2014 NEC. Per IRC Sec. R314, smoke detectors are required to be installed in every sleeping room, in hallways outside of sleeping rooms, and on every level of the structure. I, by my signature, do hereby attest that t work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all app ' ble municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the operty am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further a that le ally authorized to include all entities named within this document as partes to the work to be performed and that ork e performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of Z04INER or CONTRACTOR (Circle one) Date I 1. This permit was issued based on the information provided in the permit application and accompanying pians and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees andprocedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official _ate REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Inspection time requests will be accepted by email only. Please email requests to insptimerequestgci.wheatridge.co.us between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line. City of W he at ic1e C.�7;vi,tilll?v fly' l iit'E� k C>I'ht Cf,` 1 Building & Inspection Services Division 7500 W. 29th Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permits 6ci.wheatridge.co.us FOR OFFICE USE ONLY Date: Plan/Permit # ws� Plan Review Fee: Building Permit Application *** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: $ .3 G% Ta,1.1 Com' Property Owner (please print): aha U n Si l ll Mein Phone: 303- L141, - 92o(p Property Owner Email: Shq n . 5 i 11 i nza•�l a m ` �. Cn w, Mailing Address: (if different than property address) Address: `")'a m e oc,s 0, 6oyk City, State, Z Architect/Engineer: /j / A Architect/Engineer E-mail: /j Phone: 0_ Contractor: _1� e CAS n ne cAOn Contractors City License #: 0/728(C Phone: .903-q C, Contractor E-mail Address: Sub Contractors: N/A Electrical: W.R. City License # Other City Licensed Sub: City License # h Plumbing: W.R. City License # Other City Licensed Sub: City License # Mechanical: W.R. City License # Complete all information on BOTH sides of this form Description of work: (Check all that apply) ❑ NEW COMMERCIAL STRUCTURE ❑ ELECTRICAL SERVICE UPGRADE ❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING ❑ COMMERCIAL ADDITION ❑ RESIDENTIAL ROOFING ❑ RESDENTIAL ADDITION ❑ WINDOW REPLACEMENT ❑ COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT ❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT SYSLEOTHER (Describe)7as ling �AO.olr�inc.E Qc(G�c7i•p►z (For JELECTR'CAL projects, please provide a detailed des ri tion of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and mount of materials to be used etc ) Sq. Ft./LF Amps r aS � I Yom- �✓'Drv>. Mt�'t � '�'� ��(jti }- �.�r� l � �4 Pt iA LA)J4Yi%Ct,, W`,V-,P_ o U Btu's Squares Gallons Other Project Value: (Contract value or the cost of all materials and labor included in the entire project) .235S. op OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the truthfulness of the information prprovided —on the application. CIRCLE ONE: (OWNER)`(!NTRACTOR) r (A UTHORIZED REPRESENTA TI VE) of (OWNER) (CONTRACTOR) Electronic Signature (first and last name): DATE: (old 7 understand that checking this box, that I acknowledge that this constitutes a legal signature. ZONING COMMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer: DEPARTMENT USE ONLY OCCUPANCY CLASSIFICATION: Building Division Valuation: $ MATCH LIT KITS (FPS SERIES) UNASSEMBLED - NOT CERTIFIED Includes everything you need to put together a match lit fire pit. Includes burner, a valve with polished brass key/ flange and fittings. Included in all FPS Kits PENTA BURNER KITS- STAINLESS STEEL (#304) Features:-, Size Gas Type Model Hub Size Btu Valve Size 12" Natural Gas FPS/PENTA12KIT 1/2' 6_5k lit" Penta Burner Liquid Prcpane FPS/PENTAI 2LP KIT 18" Natural Gas FPS/PENTA 18 KIT 2" 125k I liquid Propane FPSIPENTA18LP KIT 24" Natural Gas FPS/PENTA24 KIT 1 12' 200k 1/2" Liquid Propane FPS/PENTA24LP KIT 30" Natural Gas FPS/PENTA30 KIT 3f4 250k 3,4' Liquid Propane FPS/PENTA30LP KIT ... ... ... . .. ------ 36" Natural Gas FPS/PENTA36 KIT 300k 3,,4" Liquid Propane FPSIPENTA36LP KIT 48" Natural Gas FPS/PENTA48 KIT 3!4' 300k 3W Liquid Propane FPS/PENTA48LP KIT ROUND BURNER KITS- STAINLESS STEEL (#304) 18" - 24" Size Gas Type Model Hub Size Btu valve size 6" Natural Gas FPS6 KIT /2' 60k 1/2" Liquid Prooane FPS6LP KIT 6" - 112" 12' Natural Gas FPS 12 KIT 12" 90k 1/2" Liquid L,�,pane FPS12LjPK11 iq 11/2" 150k 1/2" Natural Gas FP�1'8 KIT 30" Dqui ropa S18LP KIT 24" Natural Gas FPS24 KIT `!2 50k 1 2 a Liquid LP KIT 36' - 48" 24" (HC) Natural Gas FPS24HC KIT 3/4" 300k 3;4" Liquid Propane FPS24HCLP KIT 30" i Natural Gas FPS30 KIT '2' 300k 112" i Liquid Propane T FPS30LP KIT 30' (HC) i Natural Gas FPS30HC KIT 3/4" 300k 314" 1 Liquid Propene FPS30HCLP KIT 3153" i Natural Gas FPS36HC KIT 3,14' 300P 3,14" Liquid Propane FPS36HCLP KIT Features: 48" Natural Gas I FPS48HC KIT 3/4" 300k 314" L Liquid Propane FPS48HCLP KIT SQUARE AND RECTANGLE BURNER KITS- STAINLESS STEEL (#304) Features: Size Gas Type Model Hub Size Btu Valve size 12" Natural Gas FPSSO 12 KIT 112" i 90k 1/2' Liquid Propane FPSS012LP KIT 18- Natural Gas FPSSO 18 KIT 112' 150k 1/2' 12" - 18" Liquid Propane FPSSQ1 SLP KIT 24' Natural Gas FPSSQ24 KIT 1/2" 150k 1/2" Liquid Propane FPSSQ24LP KIT 24" 12"x 6" Natural Gas FRSR1 2X6 KIT 1/2" 90k 1/2-7 Liquid Propane FRSR12X6LPKIT 18"X 9" Natural Gas I FRSR1 8X9 KIT 112`.1 50k 1/2" Liquid Propane FRSR I 8X9LP KIT 24'x 12" Natural Gas FRSR24X72 KIT 1 150k 1,,2" Liquid Propane FASR24X12LP KIT 12"x6" - 24'x12" 26 9 z 0 m m m MM o� zi Q 7� t G S City of Wheat Ridge Residential Roofing PERMIT - 201700896 PERMIT NO: 201700896 ISSUED: 05/26/2017 JOB ADDRESS: 3839 Taft CT EXPIRES: 05/26/2018 JOB DESCRIPTION: Tear off roof material to decking and replace with Owens Corning Duration, 1 layer, 2 story, 5/12 pitch - 35 squares *** CONTACTS *** OWNER (480)522-0658 KRINER TAYLOR J SUB (303)296-0361 Randy Brothers/Cody Hayes 130240 Elite Roofing *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 12,112.55 FEES Total Valuation 0.00 Use Tax 218.03 Permit Fee 251.85"I 1111711 ** TOTAL ** 469.88 l *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding k/2-inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturera€ms installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer&#39;s technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201700896 PERMIT NO: 201700896 ISSUED: 05/26/2017 JOB ADDRESS: 3839 Taft CT EXPIRES: 05/26/2018 JOB DESCRIPTION: Tear off roof material to decking and replace with Owens Corning Duration, 1 layer, 2 story, 5/12 pitch - 35 squares I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with thispermrt. I further attest that 1 am leggally authorised to include alI entities named within this document as parties to the work to be performed and that all work to be pertormed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This. pennit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made -be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees andprocedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit no be onstrued to be a permit for, or an approval of, any violation of any provision of any applicable code or`at4 ,o ding e or r is jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line. City of Wheat�id� e t�r0-kO,i€ NI -r t €=vELoI=k1EN j Building & Inspection Services Division 7500 W. 291h Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 t Fax: 303-237-8929 Inspection Request Line: 303-2345933 Building Permit Application (Complete all highlighted areas) Property Address: 3939 Q:: i -- Property Owner (please print): -CJ-V I O Mailing Address: (if different than property address) Address: City, State, Zip: Contractor: : s � fn Date: �- r Plan # Permit # Of Phone: q60 Contractors City License #: Q Phone- Sub Contractors 0 `' _ Electrical: Plumbing: Mechanical: City License # City License # City License # Description of work- (Fully describe work to be performed - Attach additional sheet if necessary) 1-2r,c i) �� � ,r (, of Contract Value of all work: ��t`✓t i�� � O v t 0 1 C l� Z S O j� Review � 1 / � I �� 2 �, -�-�' d Fee (due at time of submittal): Squares BTU's Gallons Amps Sq Ft. S ONVNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances. rules or regulations of the City of Whrat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate: that 1 have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of U"heat Ridge coda and ordinances for work under any permit issued based on this application: that 1 am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. 3 CIRCLEO:4E: (Olf`.YERI (CO:VTRACTOR) or1A THORIZEDREPRESEVTATItE) of (ON';YER)(CO-N-7-kiCTOR) S PRINT NfAAiE: ft ,r 1100, i��' tom' SIGNATt RE: DATE: ZONING COMMENTS: Zoning: Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer. PUBLIC WORMS COMMENTS: Reviewer: DEPARTMENT USE ONLY OCCUPANCY: FIRE DEPARTMENT:: G approved w/ comments 0 disapproved 0 no review required Bldg Valuation: $ i CITY OF WHEAT RIDGE V, �9Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: &AS Job Address: :2, 36) �A Pr7 CTT Permit Number: zO I -j OZ Arpt 0Vto ❑ No one available for inspection: Time 230 ANqj11 Re -Inspection required: Yes &V When corrections have been made, call for re -inspection at 303-234- Date:- n Z30 '9 Inspector: 617 DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division / (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: �� 1 Job Address: Permit Number: U l�► f {� �! ❑ No one available for inspection: Time)Z 0 AM/PM Re -Inspection required: Yes No * When corrections have been made, call for re -inspection at 303-234-5933 Date: S' -)y ' C Inspector: DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: / " ' ( Job Address: T T C Permit Number: ()off'/ xli ❑ No one available for inspection: Time Re -Inspection required: YesNo When corrections have been made, call for re -inspection at 303-234-5933 Date: 6) �/ Inspector: r DO NOT REMOVE THIS NOTICE City of NVheat Ridge Municipal Building 7500 W29b Ave, Wheat Ridge, CO 80033-8001 P: 303.2352855 F: 303-2378929 January 12'h, 2016 Owner/Occupant 3839 Taft Ct, Wheat Ridire- C* 90033 RE: Previously permitted project plans available for retrieval — Pen -nit ##201500027 (New Single Family) Owner/Occupant, This letter is being sent to you because a project for which a permit was issued by the City of Wheat Ridge Building Division and plans and/or other documents were required was recently completed and approved. In Vvilditp'g are scheduled for disposal. We are writing to offer you an opportunity to retrieve those approved plans and/or documents prior to their disposal by the Building Division. The plans and/or documents must be retrieved in person at the Building Division offices. This letter must be presented at the time of retrieval of the plans and/or documents. Plans and/or documents available for retrieval CANNOT be mailed and plans and/or documents will NOT be available for retrieval after the expiration of the retrieval period, which is 60 days from the date of this letter. You may retrieve plans and/or documents between the hours of 7:30 a.m. and 3:- )m !T at the Building Division offices located at 7500 W. 29"' Avenue in Wheat Ridge, MEN= Melissa Mackey Senior Pe it Technician 7500 W, 29th Avenue Wheat Ridge, Colorado 80033 Office Phone: 303-235-2873 Fax: 303-237-8929 Anmsi.rdhc acrid e.cc:ua vvwwA.wheatridge.co.us plea Review Same as above Other City Licensed rib r City Licensed b City License # City Lice Complete all Information on BOTH sides of this form �•i Standard Pacific Model #5062 F ------- Main Floor ' I Upper floor IVNIIIMI [Nrlis $34,35150 ------------- -- ------- �Standard 3 Car Garage Covered Patio A Total $364,306.18 A '� 2 te•; ? i°t } �Y S .wrt �ypg r {y� i e d + r ,� r s r e + x 1 .✓ a� MmIlOW Ccntmetor ofAuthadzed Agent Date t o application must be t'd by each sub-contractor cttt at i! the some Address: —CA Doud Subdivision, Filing 2, Lot #: —JLL— Applicable survey conditions: FND (survey at foundation) NRS (survey prior to CO, z within 2 feet of setback) DOUDI (landscaping) DOUD2 (setbacks) Lot Size: ir-M� sq. Interior Side Side on street/open space Perimeter Rear WJW Is the structure. within 2 feet of minimum setbacks? (If yes, add surveying condition FND) LJ Architectural features such as cornices, eaves, belt courses, bay windows, sills, canopies, porches, decks patios, and balconies may extend or project into a setback a maximum of thirty inches. Ll The first floor of the front elevation shall have a minimum of 67% masonry: brick, brick vener, stucco, stones, stone veneer or synthetic stone, with a full return (pinrimurn 4' high) wainscoting on the sides of the hornes. 3. _V Does all existing roadway/alley R.OW, meet the standards of the City: Yes No If not, what is required? If R.O.W. is required, has the deed been received: Yes No (see Note below) IMM11 11111 11 11 IN III liilliii II !!I I III I I 1 111 1 !1 111 ill 11111!,Iliiiii I I I Ill I 1111, 1 30= 4. APPROVED: The Public Works Department has reviewed the submitted material and hereby approves this Pernut Application, subject to the stated requirements and/or attached stipulations, _3A Si __LP� gnature Date S. NIA NOT APPROVED: The Public Works Department has reviewed the submitted material and does not approve this Permit Application for the stated reason(s): Signature David F. Brossman, P.L.S, Date 6. _%/ Stipulations: N G& - I FACT W. �, PF-117� 'Tc� T _A/ A Drainage Certification Letter accompanied by As-Built plaris from the Engineer-of-Record sball be required prior to the issuance of the Certificate of Occupancy. 8, NOTE: ANY DAMAGE TO EXISTING PUBLIC IMPROVEMENTS AS RESULT OF PROJECT CONSTRUCTION SHALL BE REPAIRED PER ROW CONSTRUCTION PERMIT PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. City 0f h6 at Ale PUBLIC W ORKS City of Wheat Ridge Municipal Building 7500 W, 29 "' Ave„ Wheat Ridge, CO 80033-8001 ; 30123 Eil : 303,235,2857 PUBLIC WORKS,I)EVELOPMENT REVIEW FEES Date; J#P��- Deve + rent Jet wi gore i a l ., $100m t3 , (Required of all projects for document processing) ,, :.wr►erci ulti -1 it Review Fees: Rev 12112 City of PUBI IC WORKS A V olume Total Building Supply CRTi: 1 CF Square ft of Room Area. 4,298 Square ft Per Ton* �1 4 of • ! Spa r Calcul ations rf * per A ! Manual . 8th E d iti on , V ersion .. • A CCA M anua l All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at y our design conditio Y.1 ... \Plan 5857.rhv � � �� Wednesday, February 12, 2014, 8:08 AM 1 *. *:.. � Ali # •.... .' ,''�: a V olume Total Building Supply CRTi: 1 CF Square ft of Room Area. 4,298 Square ft Per Ton* �1 4 of • ! Spa r Calcul ations rf * per A ! Manual . 8th E d iti on , V ersion .. • A CCA M anua l All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at y our design conditio Y.1 ... \Plan 5857.rhv � � �� Wednesday, February 12, 2014, 8:08 AM rvjarrr j rurrrc Yes Yes >r: 0.00300 0.1000 in. gJ100 ft. C 650: ft. /min Y: 900 ft. /min r5ul lvutz� Yes Yes 0.01 000 0.1000 in.wg. /100 ft: 450 ft. /min 750 ft. /min inimum Height: 0 in. 0 in: irr um Height: 0 in. 0 in. 2 Supply t int r Summer Infiltration Specified: 0.280 AC /hr 0.250 AC /hr Yes 122 CFM 122 CFM Infiltration Actual: 0.309 AC /hr 0.000 AC /hr Above Grade Volume: X 29J95 Cu.ft. X 29,125 Cu:ft. 9,008 Cu ft. /hr 9,008 Cu.ft. /hr i X 0.0167 X 0.0157 , Total Building Infiltration: 150 CFM 150 CFM Total Building Ventilation: 0 CFM 0 CFM - -- System 1 - -- Infiltration & Ventilation Sensible twain Multiplier: 14.39 = (1.10 X 0.817 X 16.00 Summer Temp. Difference) Infiltration & Ventilation Latent Gain Multiplier: - 2'1,70 = (0.68 X 0.817 X -89.04 Grains Difference) Infiltration & Ventilation Sensible Loss Multiplier: 62.04 = (1.10 X 0.817 X 69.00 Winter Temp. E Difference) Winter Infiltration Specified: 0.250 AC /hr (122 CFM) Summer Infiltration Specified: 0.250 AC /hr (122 CFM) 2 Supply Garage Open Crawl 0.06 8 288.8 Yes 2 Return Garage Open Crawl' 0.06 8 22 Yes Y :\...\Plan 5057.rhv Wednesday, February 1, 2014, 8:08 AM ROME Sum of room airflows may be greater than system airflow because I s stem room a'srflow o ttiion uses the rester of heatm or cooling. _.._ t i i i E i 3 1 3 Y:\ .,.\Flan 5057.rhv Wednesday, F ebruary 12, 2014, 8:08 A 01- I t+tFt tt, a7`ef3 Latl Nets Seri Sy Sys Sy& L�uG^t Scope 0 11 orb Akre 03a1n 03a�n Dawn Loss t 1tg ! Act Six Busld�ng 2.36 1,984 4,298 28,267 -2,274 28,267 55,590 1,066 1,200 1,200 System) 1 2.86 1,984 4,298 28,267 -2,274 28,257 55,590 1,066 1,200 1,200 25x1 Duct Latent -217 0 Humidification 2,309 Zone 1 4,298 28,267 - 2,057 28,267 53,281 1,066 1,200 1,200 12x1 I-Rec boom 929 1,321 -134 1 7,272 14 56 145 7,7 2 -BR 5 177 518 -37 518 1,766 35 22 3 5 6 3 -Bath 4 47 9 -5 9 296 6 0 6 4 4 -Mech }Storage 322 88 -61 88 3,109 62 4 62 5 5-Project Rm 152 1,582 -231 1,582 2,720 54 67 67 6, 6 -Mud Room 79 624 -165 624 1,768 35 27 35 6 7- Kitchen/Nook 399 6,708 -412 6,708 6,563 131 285 285 7,7,7 8 -Great Boom 527 3,916 -101 3,916 5,916 118 166 166 7,7; 9 -Bath 3 48 152 -49 152 536 11 6 11 4 10- BR4f07pt Study 179 2,0348 -104 2,048 3,749 75 8 87 7, ; 1 4 11 -Entry 92 463 -152 463 1,715 34 2 0 34 5 E 12- Master BR 276 3,679 -50 3,679 4,199 84 166 156 7,7, } 13 -BR 2 181 989 -106 989 1,616 32 42 42 7 14 -Bath 2 71 171 -41 171 511 10 7 10 4 15 -BR 3 191 1,895 -20 1,895 2,927 59 80 80 7, 16- Laundry 61 311 -32 311 523 10 13 13 4 17-Library 269 2,183 -41 2,183 3,525 71 93 93 6, s 18- Master Bath 189 980 -156 980 2,526 51 42 51 6, 19 -WIC 3 51 283 -114 283 1,261 25 12 25 5 0 -W IC 2 58 346 -46 346 783 16 15 16 4 Sum of room airflows may be greater than system airflow because I s stem room a'srflow o ttiion uses the rester of heatm or cooling. _.._ t i i i E i 3 1 3 Y:\ .,.\Flan 5057.rhv Wednesday, F ebruary 12, 2014, 8:08 A 01- - -Duct Name: "T =250, Effective Length: 1. Trunk 0.0003 12.9 275 0.000 Up: ST -240 55 14 0.010 0.000 Rect 1.5 10 0.0 O.00O # Presize 267 6 0.230 0.520 --- Duct Name: T -240, Effective Length: 1.2 Trunk 0.0003 12.9 322 0.000 Up: ST -200 55 14 0.014 0.000 Rect 12 10 0.0 0.000 Presize 313 4:7 0.230 0.520 -e -Duct Name: T -200, Effective Length: 2.3 Trunk 0.0003 12.9 360 0.000 Up: ST -140 55 14 0.016 0.000 Rect 23 10 0,0 0.000 Presize 350 9.3 0.280 0.520 { - -Duct Name. ST -190, Effective Length: 4.2 Trunk 0.0003 12.9 216 0,000 Up: T -250 55 14 0.007 0.000 Rect 4.2 10 0.0 0.000 Presize 210 161.7 0.279 0.521 s -- -Duct Name. T -100, Effective Length: 7. Trunk 0.0003 12.9 104 0.000 Up: T -190 55 14 0.006 0.000 Rect 7.7 10 0.0 0.000 Presize 189 30.7 0.279 0.521 I --- Duct Name:. ST -170, Effective Length: 5.2 Trunk 0.0003 6.7 230 0.001 Up: ST -150 55 4 0.019 0.000 Rect 5.2 10 0.0 0.001 Presize 64 12.1 0.277 0.523 -- -Duct Name,. ST -160, Effective Length. 9.7 Trunk 0.0003 12.9 141 0.000 Up: ST -160 55 14 0.003 0.000 Rect 9.7 10 0.0 0.000 Presize 137 38.7 0.279 0.521 -- -Duct Name: ST -150, Effective Length: 2.5 Trunk 0.0003 6.7 306 0.001 Up: ST -160 55 4 0.031 0.000 Rect 2.5 10 0.0 0.001 Presize 85 5.8 0.278 0.522 Y:\ ... \Plan 5057.rhv Wednesday, February 12, 2014, 8 :08 A -- -Duct Name: SR -24O Supplies. Kitchen /Nook, Fittings; 2 -1, 4 -1°1, 8 -A2, 8 -A2, Effective Length: 78.9 Runout 0.0003 7 266 0.003 Up: ST -2601 55 5.4 0.019 0.011 Rnd 13.3 7.7 57.6 0.013 Presize 71 24.4 01.264 01.535 -- -D Name: SR -25O, Supplies: Kitchen /Nook, fittings: 2 -1 4 -G, Effective Length: 83.6 __Duct Name. SR -280, Supplies. Project Rm, Runout 0.0003 7 266 07.0)0)4 Up: ST -340 55 5.4 0.019 0.012 Rnd 22.3 7.7 613 0.016 Presize 71 40.9 0.262 0.538 -- -Duct Name: SR -26O, Supplies: Kit /Nook, F ittings: 2-1, 8 Effective Length: 94.6 Runout 0.0003 7 266 0.005 Up: ST -290 55 5.4 0.019 0.013 Fend 24.0 7.7 70.6 0.018 Presize 71 44 0.260 0.540 ___Duct Name: SR Supplies: Mud Room, Fittings: 2 -1, 4 -G, Effective Length: 85.5 4 Runout 0.0003 6 178 0.00 3 Up: ST -230 128 47 0.010 0.005 Rnd 31.8 6.6 517 0.009 I Presize 35 50 0.271 0.523 � __Duct Name. SR -280, Supplies. Project Rm, Fittings: 2-1,4-G, 8-A2,8-A2, Effective Length: 92.1 Runout 0.0003 6 173 0.003 Up. ST -360 55 4.7 0.011 0.007 Rnd 28.7 6.6 63.5 0.010 Presize 34 45 0.268 0.532 -- -D Name. SR -290, Supplies: Proj Rm, Fittings: 2-1,4-G, Effective Length: 77.5 Runout 0.0003 6 173 0.003 Up: ST -280 55 4.7 0.011 0.005 Rnd 32.0 6.6 45.5 0.008 Presize 34 503 0.271 0.529 -- -Duct Name: SR -300, Supplies: Kitchen /Nook, Fittings: 2-1,4-H, Effective Length: 76.1 Runout 0.0003 7 266 0.003 Up: ST -220 55 5.4 0.019 0.011 Rnd 16.7 7.7 59.5 0.014 Presize 71 30.5 0.265 0.535 Y:\ ...\Plan 5O57.rhv Wednesday, February 12, 2014, A ( 2 ) -- -Duct Name: ST -140, Effective Length: 1' 2 Trunk 0.0003 12.9 377 0:000 Up ST -120 55 14 0.018 0.000 Rect 12 10 0.0 0.0070 Presize 355 4.7 0280 0.520 - --Duct Name: SR -310, Supplies. Entry, Fittings: 2 -1, 4 -G, Effective Length: 46.8 Runout 0.0003 5 249 0.000 Up. ST ®110 120 3.9 0.023 0.011 Rnd 0.5 5.5 46.3 0.011 Presize 34 01 0.274 0.526 m - - Duct Name: SR-320, Supplies: Bath 3, Fittings: 2 -1, 4 -H, Effective Length. 31.3 I Runout 0.0003 4 126 0.001 Up. ST -330 128 3.1 0.010 0.002 Rnd 10.7 4.4 20.6 0.003 Presize 11 11.2 0.281 0.510 i -- -duct Name. SR -330, Supplies, BR41Opt Study, Fittings. 2 -1, 4 -G, 8-A2, 8 -A2, Effective Length. 95.6 E Runout 0.0003 7 161 0.002 Up, ST-310 55 5.4 0.008 0.005 Rnd 28.0 7.7 67.6 0.007 Presize 43 51.3 0277 0.523 I -- -Duct Nerve. SR -340, Supplies. SR4 /Opt Study, Fittings. 2-1,4-G, 8-A2,8-A2, Effective Length. 89.4 Runout 0.0003 7 161 0.001 Up. ST -110 55 5.4 0.008 0.006 Find 18.5 7.7 70.9 0.007 Presize 43 33.9 0.278 0.522 }€} --Duct Name. SR -350, Supplies. greet Room, Fittings: 2-1,41-H, Effective Length. 40.8 i Runout 0.0003 7 206 0.000 Up. ST -260 55 5.4 0.012 0,005 Rnd 0.7 7.7 402 0.005 + Presize 55 1.2 0.273 0.527 -- -Duct Name: SR -360, Supplies: Great Room, Fittings. 2•1, 4 -G, 8 -A2, 8 -A2, Effective Length: 83.8 g Runout 0.0003 7 206 0.001 Up: ST -270 55 5.4 0.012 0.009 Rnd 87 7.7 75.1 0.010 ; Presize 55 15.9 0.268 0.532 -- -Duct Name: SR -370, Supplies: great Room, Fittings: 2-1,4-G, 8 -A2, 8-A2, Effective Length. 92.0 Runout 0.0003 7 206 0.002 Up. ST -290 55 5.4 0,012 0.009 Rnd 15.2 7.7 76.8 0.011 Presize 55 27.8 0.267 0.533 -_ -Duct Name: T -340, Feeds Into: Rec Room, Effective Length: 0. Trunk 0.0003 12.9 203 0.000 Up: ST -270 55 14 0.006 0.000 Rect 0.5 10 0:0 0.000 Presize 197 2 0.278 0.522 Y:1 ... \Plan 5057.rhv Wednesday, February 12, 2014, 8.08 A M. -- -Duct Name: ST-320, Feeds into: ech/ Storage, Effective Length: 1.8 Trunk 0.0003 18.6 521 0.000 Up: T -330 55 25 0.022 0.000 Rect 1.8 12 0.0 0.010 Presize 1,085 11.8 0.284 0.516 -- -Duct Name: ST -310, Feeds Into: Mech/ Storage, Effective Length: 1.3 Tank 0.0003 18.6 544 0.000 Up: ST -110 55 25 0.024 0.000 Rect 1.3 12 0 0 0.000 Presize 1,134 8.2 0.285 0.515 --- Duct Name: ST-300, Feeds Into: Rec Room, Effective Length: 3.4 Trunk 0.0003 15.2 353 0.000 Up: ST -280 55 20 0.014 0.000 Fleet 3.4 10 0.0 0.000 Presize 490 17.1 0.278 0.522 -- -Duet Name: ST -290, f=eeds Into: Rec Room, Effective Length: 0.8 Trunk 0.0003 12.9 389 0.400 Up: ST -360 55 14 0.019 0.000 Rect O} 8 10 0.0 0.000 Presize 378 3.3 0.278 0.522 -- -Duct Name: ST -280, Feeds Into: Rec Room, Effective Length: 4.0 Trunk OM03 15.2 377 0.001 Up: ST -230 55 20 0.016 O,4 O Meet 4.0 10 0.0 0.001 Presize 524 20 0.279 0.521 -- -Duct Name. ST-270, Feeds Into: Rec Room, Effective Length: 0. Presize 126 3.3 0.278 Trunk 0.0003 12.9 259 0.000 Up: ST -290 55 14 0.409 0.000 Rect 0.5 10 0.0 0.000 Presize 252 2 0.278 0.522 --- Duct Dame: ST -260, Feeds Into: Rec Room, E=ffective Length: 0.8 Trunk 4.0403 12.9 130 0.000 Up. ST -340 55 14 0.003 0.004 Rect 0.8 10 0.0 0.044 Presize 126 3.3 0.278 0.522 -- -Duct Name. ST -230, Feeds Into: Rec Doom, Effective Length: 1.0 Trunk 0.0003 15.2 397 0.0030 Up: ST -224 55 20 0.017 0.000 Rect 1.0 10 0.0 4.004 Presize 551 5 0.280 0.520 -- -Duct Name: ST -220, Feeds Into: Rec Roam, Effective Length: 1.2 Trunk 0.0003 15.2 457 0:000 Up: ST -210 55 20 0.022 0.000 Rect 1.2 10 0.0 0.000 Presize 635 5.8 0.280 0.520 -- -Duct Name: ST -210, Feeds Into: Rec Room, Effective Length. 0.8 Presize 366 6.7 Trunk 0,0003 15.2 486 0.000 Up: ST -130 55 20 0.025 0.000 Rect 0.8 10 0:0 0.000 Presize 675 4.2 0.280 0.520 -- -Duct Name: S T -100, Feeds Into: Mech/ Storage, Fitting. 1-1 Effective Length: 132.8 Rect 2.5 Tank 0.0003 16.9 690 0.000 Up: Fen 55 25 0.043 0.056 Rect 0.8 10 131.9 0.382 Presize 1,197 4.9 0.285 0.515 -.. -Duct Name: ST -110, Feeds Into: Mechl Storage, Effective Length: 1.3 Trunk 0.0003 18.6 575 0.000 Up: SMT -100 55 25 0.026 0.000 Rect 13 12 0.0 0.000 Presize 1,197 8.2 0.285 0.515 -- -Duct Name: ST -120, Effective Length. 1.7 Trunk Trunk 0.0003 12.9 377 0.000 Up. ST -380 55 14 0.018 0.000 Rect 1.7 10 0.0 0.000 Presize 366 6.7 0.281 0.519 _- Duct Larne. ST -130, Feeds Into Rec Room, Effective Length. 2. 0.284 0.516 Trunk 0x0003 15.2 515 0.001 Up. ST -380 55 20 0.027 0.000 Rect 2.5 10 0.0 0,001 Presize 715 12.5 0.280 0.520 -- -Duct Name: ST -330, Feeds Into: Mach/ Storage, Effective Length: 1.7 Trunk 0.0003 18.6 524 0.000 Up: ST -310 55 25 0.022 0.000 Rect 1.7 12 0.0 0,000 Presize 1,091 10.3 0.284 0.516 -- -Duct Name: SR -300, Supplies: Rec Room, Fittings: 2-1,4-AD, Effective Length: 83.1 Runout 0.0003 7 273 0.006 Up: ST -370 128 5.4 0.018 0.009 Rnd 31.4 7.7 51.7 0.015 Presize 73 57.6 0263 0:537 Y:\ ... \Plan 5057.rhv - Wednesday, February 12, 2014 8:08 A -- -Duct Name: ST-350, Feeds Into: Rec Room, Effective Length: 0.6 I Trunk 0.0003 12.9 453 0.000 Up: ST -370 55 14 0.026 0.000 Rct 0;8 10 0.0 0.000 Presize 440 3.3 0.278 _ 0.522 -w -Duct Name: SR-390, Supplies: Rec Room, Fitting: 4 -C, Effective Length: 59.6 Runout 0,0003 7 273 0.005 1 Up: ST-350 128 5.4 0.018 0.006 Rnd 26.5 7.7 33.1 0.011 Presize 73 48.6 0267 0.533 -- -Duct Name: ST -360, Feeds Into: Rec Room, Effective Length: 0.8 Trunk 0.0003 12.9 424 0.000 { Up. ST-350 55 14 0.023 t 0.000 Re t 0.8 10 0.0 0.000 Presize 412 3.3 0.278 0.522 ___D Name: SR-400, Supplies: BR 5, Fittings: 2-1,4-AD, Effective Length: 57.4 # Runout 0.0003 6 178 0.002 Up: T -300 128 4.7 0.010 0.004 Rnd 16.0 6.6 41.4 0.006 Presize 35 25.1 0.273 _ 0.527 -a -Duct Name: ST-370, Feeds Into: Rec Room, Effective Length: 1.6 } Trunk 0.0003 15.2 337 0000 Up: T -300 55 20 0.013 0.000 } Rect 1.6 10 0.0 0.000 ? Presize 468 7.9 0.278 0.522 -- -Duct Name: SR-410, Supplies: Rath 4, Fittings: 2-1,4-AD, Effective: Length: 36.4 Runout 0.0003 4 69 0.000 Up: T -230 128 3A 0.003 0.001 E Rnd 9.2 4.4 21.2 0.001 Presize 6 9.6 0.278 0.522 -- -Duct Name: R -420, Supplies: Mech/ Storage,, Fittings: 2 -I, 4 -AD, Effective Length: 53.4 Runout 0.0003 5 455 0.010 ? Up. ST -320 128 3.9 0.067 0.026 Rnd 15.3 5.5 38.0 0,036 Presize 62 20.1 0.248 0.552 -- -Duct Name: ST-380, Feeds Into: Stec Room, Effective Length: 6.8 Trunk 0.0003 16.9 623 0.003 Up: ST -320 55 25 0.035 0.000 Ret 8.8 10 0.0 0.003 Presize 1,081 51.5 0.281 0.519 Y:1 ... \Plan 5057.1 v Wednesday, February 12, 2014, 8 :08 A -- -Duct Name: SR-100, Supplies: Master BR, Fitting: 4-G, Effective Length: 32.6 Runout 0.0003 7 195 0.001 Up: ST -170 55 5.4 0.011 0.003 Rnd 5:0 7.7 2T6 0.004 Presize 52 9.2 0.273 0.527 -- -Duct Name: SR-110, Supplies: Master BR, Fittings: 2-1,4-G, Effective Length: 68.8 Runout 0.0003 7 195 0.002 Up: ST-160 55 5.4 0.011 0,005 Rnd 18.8 7.7 49.9 0.007 Presize 52 34.5 0.271 0.529 -- -Duct Name: SR•120, Supplies: Master BR, Fittings: 2-1,4-G, Effective Length: 75.8 Runout 0,0003 7 195 0.002 Up: ST-180 55 5.4 0.011 0.006 Rnd 19.0 7.7 56.8 0.008 Presize 52 34.8 0,271 0.529 --Duct Name: SR-130, Supplies: WIC 1, Fittings: 2-1,4-H, Effective Length: 30.3 Runout 0.0003 5 183 0:000 Up: ST-170 128 3.9 0.014 0.004 Rnd 22 5.5 28.1 0.004 Presize 25 2.8 0.273 0.527 ---Duct Name: SR-140, Supplies: Master Bath, Fittings: 2-1,4-H, Effective Length: 37.1 Runout 0.0003 6 127 0.000 Up: ST-150 128 4.7 0.006 0.002 Rnd 4.8 6.6 32.2 0.002 Presize 25 7.6 0276 0.524 - - -Duct Name: SR- 150, - Supplies: Master Bath, Fittings: 2-1,4-H, Effective Length: 45.5 Runout 0.0003 6 127 0.000 Up: ST-190 128 41 0.006 O«002 Rnd 4.8 6.6 40.6 0.003 Presize 25 7.6 0.277 0.523 -- -Duct Name: SR-160, Supplies: WIC 2, Fittings: 2-1,4-G, Effective Length: 39.6 Runout 0.0003 4 183 0.001 Up ST-250 128 3.1 0.018 0.006 Rnd 6.7 4.4 33.0 0,007 Presize 16 7 0.272 0.528 -- -Duct Name: SR-170, Supplies: BR 2, Fittings: 2-1,4-G, Effective Length: 77.8 Runout 0.0003 7 157 0.001 Up: ST-250 55 5.4 0.007 0.004 Rnd 18.8 7.7 59.0 0.006 Presize 42 34.5 0.274 0.526 - --- ------- Y:\ ... \Plan 5057.rhv ...... ------- - - ----- 1-1 ------- Wednesday, February 12, 2014, 8:08 AM -- -Duct me: SR-180, Supplies: Rath 2, Fittings: 2-1,4-H, Effective Length: 40.8 Runout 0.0003 4 115 0.001 Up: ST-140 128 3.1 0.008 0.002 Rnd 15.2 4,4 25.7 0.003 Presize 10 15.9 0.277 0.523 --- Duct Name: SR -199, Supplies: RR 3, Fittings: 2-1,4-G, 12 -S 12 -S Effective Length: 110.7" Runout 0.0003 7 150 0.002 Up: ST -130 55 5.4 0.007 0.006 Rnd 29.8 7.7 80.9 0.008 Presize 40 54.7 0.273 0.527 -- -Duct Name: R -200, Supplies. BR 3, Fittings: 2-1,4-H, 12- S,12 -S, Effective Length: 96.5 Runout 0.0003 7 150 9.992 Up: ST -210 55 5.4 0.007 0.005 Rnd 25.3 7.7 712 0.007 Presize 40 45,4 0273 0.527 -.. -Duct Name. SR -218, Supplies: Laundry, Fittings: 2 -1, 4 -G, 8-A2, -A2, Effective Length: 58.3 Runout 0,0003 4 149 0.002 Up: ST-220 55 V 0.014 0.005 Rnd 14.2 4.4 36.2 0.007 Presize 13 14.8 0273 0.527 Number et active true s: Number of active runcuts: 33 Y :\ ...\Plan 5057.rhv Wednesday, February 12, 2014, 8:08 AM -320 -240 L- ClIuvot TutIVUL t:.11cullutVI. Smallest trunk diameter. I 8.7 W. a ST -170 Smallest runout diameter: 4 ' SR -320 Supply fan external static pressure: 0.800 Supply fan device pressure losses: 0325 Supply tan static pressure available: 0.475 Runout maximum cumulative static pressure loss: O} 552 , SR -420 t Return loss added to supply: OA 33 Total effective length of return (ft.): 405.4 Bsmt Low Total effective length of supply ( ft.): 192.3 S -420 Overall total effective length ( ft.): 597.7 Ssmt Low to SR -420 Design overall friction rate per 100 ft.: 0.079 (Available Sly x 100 / TEL) System duct surface area (No Scenario): 905.9 System duct surface area (Scenario 2): 283.8 Garage (Limed to duct load) Total system duct surface area: 1190.7 i { l l i t I 6 I l C Y:t ... \Flan 5057.rhv Wednesday, February 12, 2014, 8:08 AM -- -[duct Name: RT -1411, Feeds Pram; Kitchen/Nook, Effective nth: 5.5 Trunk 0.0003 12.9 498 0.002 Up: RT -120 75 14 0,029 0.000 Rect 5:5 10 0.0 0.002 Presize 484 2 -0.050 0.011 -m -Duct Name: Low, Returns From: Entry, Fittings: -13, 6 -M, 8 -83C, Effective Length: 167.6 Runcut 0.0003 12.9 352 0.000 Up: RT -160 75 14 0.016 0.026 Rect 0.0 10 167.6 0.926 Presize 342 0 4027 0.026 -- -Duct Name: Low, Returns From: Kitchen /Nook, Fittings- 6-B, 6 -M, 6- 3 , Effective Length: 167.8 Runout 0.0003 12.9 352 0.000 Up. RT -180 75 14 0.016 0.026 Rect 0.2 10 167.6 0.027 Presize 342 0.7 -0.024 0.027 -- -Duct Name: RNIT -100, Feeds Pram: Mech/ Storage, Fittings: 5 -H1, 5 -N, Effective Length: 219.2 Trunk 0.0003 18.6 680 0.000 Up: Fan 75 25 0.035 0.076 Rect 0.7 12 218.5 0.076 Presize 1,417 4.1 4057 0.133 -- -Duct Name. RT -110, Feeds From: Mechl Storage, Effective Length: 7.0 Trunk 0.0003 18.6 680 0.002 Up. RMT -100 75 25 0.035 0.000 Rect 7.0 12 0.0 0.002 Presize 1,417 432 -0.055 0.130 -- -Duct Nerve. T -128, Effective Length. 4.2 Trunk 0.0003 12.9 498 0.001 Up. RT -170 75 14 0.029 0.000 Rect 4.2 10 0.0 0.001 Presize 484 161 -0.052 0.013 -- -Duct Name. RT -130, Feeds From: Rec Room, Effective Length. 2.0 Trunk 0.0003 16.9 197 0.000 Up. RT -170 75 25 0.004 0.000 Rect 2.0 10 0.0 0.000 Presize 342 11.7 _0.053 0.029 -- -Duct Name. RT -160, Feeds From* Storage, Effective Length. 3.0 Trunk 0.0003 12.9 352 0.000 Up. RT -230 75 14 0.016 0000 Rect 3.0 10 0.0 0.000 Presize 342 12 -0.054 0.027 Y:\ ... \Plan 5057.rhv Wednesday, February 1 , 2014, 8:08 AM w -- -Duct Name: RT -170, Feeds From: Rec Room, Effective Length: 7.5 t "gunk 0.0003 16.9 476 0.002 Up: RT -230 75 25 0.021 0.000 Rect 7.5 10 0.0 0.002 Presize 826 43.8 _ .0.053 _ 0.014 p -µ -Duct Name: " -t 8, Feeds From: Rec Room, Effective Length: 11.5 Trunk 0.0003 12.9 352 0.002 Up: RT -210 75 14 0.016 0.000 Rect 11.5 10 0.0 0.002 Presize 342 46 -0.050 0.027 - -Duct Name. RT- 210, -Feeds From. Rec Room, Effective Length. 8.5 Trunk 0.0003 16.9 197 0.000 Up. RT -130 75 25 0.004 0.000 3 Rect 8.5 10 0.0 0.000 Presize 342 49.6 -0.052 0.028 --- Duct Name: RT -228, Feeds Pram. lec l Storage, Effective Length: 4.1 Trunk 0.0033 10 457 0.001 Up: RT -110 75 7.8 0.031 0.000 Rnd 4.1 10,9 0.0 0.001 Presize 249 10.7 -0.053 0.129 x - - -Duct Name: "T -2 0 Feeds' From: leech/ Storage, Effective Length: 1.5 Trunk 0.0003 18.6 561 0.00 Up: RT -110 75 25 0.024 0.000 I Rect 1.5 12 0.0 0.000 1 Presize 1,168 9.2 -0.054 0.016 -- -Duct Name: Bsrnt Lover, Returns From: echl Storage, Fittings: 6-C, 6 -C, 8 -A2, Effective Length: 175..2 Runout 0.0003 10 457 0.000 Up: RT -220 75 7.8 0.031 0.053 Rnd 0.0 10.9 175.2 0053 Presize 249 0 0 000 0.053 -- -Duct Name: Mstr Ceiling, Returns From: Master BR, Fittings: 6-C, -L, Effective Length: 77.9 Runout 0.0003 12 315 0.002 Up. RT -140 75 9.3 0.012 0.008 Rnd 13.2 13.1 64.7 0.010 Presize 247 41.6 -0.040 0.010 -- -Duet Name: Nall Ceiling, Returns From: Library, Fittings: 6 -C, 6 -L, Effective Length: 73.1 Runout 0.0003 12 302 0.001 Up: RT -140 75 9.3 0.012 0.007 Rnd 9.0 13.1 64.1 0.008 r Presize 237 28.4 -0.041 0.008 Y:t ... \Plan 5057.rhv Wednesday, February 12, 2014, 8 :08 A Number of active trunks: 11 Number of active runouts: 5 Total runout outlet airflow: 1,417 Main trunk airflow: 1,417 Largest trunk diameter: 15.5 f MT -100 Lamest runout diameter: 12:0 Low Smallest trunk diameter: 10 FAT -220 Smallest runout diameter; 10 Bsmt Low I Runout maximum cumulative static pressure loss: 0.053 Ssmt Low Return loss added to supply: 0.133 Total effective length of return ( ft.): 405.4 l smt Low System duct surface area (loo Scenario): 247.0 System duct surface area (Scenario 1): 70 Attic (Linked to duct load) System duct surface area (Scenario 2): 22 Garage (Linked to duct load) € Total system duct surface area: 330.5 Y :\ ... \Plan 507.rhv Wednesday, February 12, 2014, :08 AM Ca5l) floor in 2 x 4 cavity, core, no board insulation, plus interior finish, wood studs, 8' floor depth 15B11 -Ow -9: all_ 74.5 292 0 7 7 Basement R11 -9: Wall - Basement, Custom, R ®11 599.9 2,195 0 36 36 Basement wall 12F -Osw: Wall - Frame, R -21 insulation in 2 x 6 stud cavity, 3048.2 13,672 0 2,237 2,237 no board insulation, siding finish, wood Muds 16B -38: Roof /Ceiling - Under Attic with Insulation on Attic 1767.2 3,205 0 2,138 2,138 Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and gavel or Membrane, � R -38 insulation 21 A -32. Floor- Basement, Concrete slab, any thickness, 2 1153 1,591 0 0 0 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 32' wide 1 1 A -32 - Floor - Basement, Concrete slab, any thickness, 321.8 444 0 0 0 2 or more feet below grade, no insulation below floor, carpet covering, shortest side of floor slab is 32` wide 20P-30 open crawl space or garage, Passive, 317 766 0 66 66 R-30 blanket insulation, ny a cover Subtotals for structure. 36,692 0 19,794 19,794 People: 6 1,200 1,380 2,580 Equipment. 0 1,200 1,200 Lighting. 0 0 0 Ductwork: 5,076 °217 1,744 1,527 Infiltration. Winter CFM: 150, Summer CFM: 150 9,313 -3,257 2 -1,096 Ventilation. Winter CFM. 0, Summer CFM. 0 0 0 0 0 Humidification (Winter) 6.30 gal /day: 2,309 0 0 0 AE19 Excursion w, .. _ _ -, .M.. _ . --- 0 . 1,986 1986 Total Building Load Totals. 55,590 -2,274 26 25,993 1 r Total Building Supply CFM. 1 CFM Per Square ft. 0.279 Square ft. of Roeim Area. 4;296 :Square ft. Per Ton:.. 1,96+1 t Volume (W) of Cond. Space. 42,222 at * an ACCA ap proved Manual J and Manual it computer progr Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. 4ata at your design conditions. >r i w w ii i * M as i *i • • • ! •• i Y:4 ... \Plan 5057.rhv Wednesday, February 12, 2014, 6:06 AM mb. uoor. uoor -u =:1 `1 4 41.8 46 151315 -0w -9: Wail- 1 1194,4 4,238 151315 -0w -8: Wall-Basement, framing with R -15 sill to 2 225,6 794 floor in 2 x 4 cavity, core, no board insulation, plus interior finish, wood studs, 8' floor depth 151311 -Ow -9 Wall- 7 74.5 292 Basement R11 -9; Wall - Basement, Custom, R -11 5 599.9 2,195 Basement wall 12F -Osw: Wall - Frame, R -21 insulation in 2 x 6 stud cavity, 3 3048,2 13,672 no board insulation, siding finish, wood studs 16R -38. Roof /Ceiling -under Attic with insulation on Attic' 1 1787.2 ` 3,205 Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Darr Asphalt Shingles or Darr Metal, Tar and Gravel or Membrane, R -38 insulation 21A-32: Floor - Basement, Concrete slab, any thickness, 2 1 1153 1,591 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 32' wide 21 A-32-c: Floor - Basement, Concrete slab, any thickness, 3 321.8 444 2 or more feet below grade, no insulation below floor, carpet covering, shortest side of floor slab is 32' wide 20P -0: Floor -Over open crawl space or garage, Passive, 3 317 766 R-30 insulation, a blanket insuland cover .._ ... ,_..w. _...,.. ......... 0 148' 148 0 74 74 0 13 1 0 7 7 0 36 36 0 i V € 0 66 66 0 19,794 19,794 1,200 1,380 2,580 0 1,200 1,200 0 0 -217 1,744 1,527 -3,257 2,161 -1,096 0 0 0 0 0 0I 0 .., 1,988 -2,274 28,267 25,993 Y • w.. an l R approved M r ♦: a nd iflan com p u ter program. Calculations are performed per ACCA Manual J 8th Edition, • ! ACCA Manual M All computed results are estimates as building use and weather may vary. data at your design conditions. Y:\ ,.. \Plan 5057.rhv Wednesday, February 12, 2014, 8.08 AM Cq) 0 i V € 0 66 66 0 19,794 19,794 1,200 1,380 2,580 0 1,200 1,200 0 0 -217 1,744 1,527 -3,257 2,161 -1,096 0 0 0 0 0 0I 0 .., 1,988 -2,274 28,267 25,993 Y • w.. an l R approved M r ♦: a nd iflan com p u ter program. Calculations are performed per ACCA Manual J 8th Edition, • ! ACCA Manual M All computed results are estimates as building use and weather may vary. data at your design conditions. Y:\ ,.. \Plan 5057.rhv Wednesday, February 12, 2014, 8.08 AM Cq) • w.. an l R approved M r ♦: a nd iflan com p u ter program. Calculations are performed per ACCA Manual J 8th Edition, • ! ACCA Manual M All computed results are estimates as building use and weather may vary. data at your design conditions. Y:\ ,.. \Plan 5057.rhv Wednesday, February 12, 2014, 8.08 AM Cq) Cooling System Type: Standard .Air Conditioner Outdoor Model: CA1 NA036* * * * {A,I Indoor Model: CNPV *4221AL *+TDR Tradename: 13 SEER PURON AC Outdoor Manufacturer: CARRIER AIR CONDITIONING AHRI Reference No.: 6395468 Nominal Capacity: 33000 Efficiency: 13 SEER Heating System Type: Natural Gas Furnace Model: 59SC2R080C21 - -20 Tradename: Carrier Manufacturer: CARRIER CORPORATION Description: Natural Gas or Propane Furnace Capacity: 75993 Efficiency: 92.1 AFUE ? Q 3 4 Z 4 P i } i i Y:\ ... \Plan 5057.rhv Wednesday, February 12, 2014, 6:08 AM Room length: 928.9 ft. System Number: 1 0.1 Room Width: 1.0 ft. Zone Number: 1 3.5 Area: 929.0 sq.ft. Supply Air: 145 CFM G Ceiling Height. 10.2 ft. Supply Air Changes. 0.9 A Volume: 9,444.0 cu.ft. Req. Vent. C lg. 0 CFM Number of Registers. 2 NW- Wall - 151315 -Ow -9 7.7 X 102 Actual Winter Vent.. 0 C >FM 279 0.1 0 Percent of Supply.: 0 % 0.051 3.9 292 Actual Summer Vent.: 0 GFM NE- Wall - 15515 -Ow -9 31.5 X 320.4 0.047 Percent of Supply: 0 % 0 22 10.2 Actual Winter lnfil.: 6 CFM Actual Summer lnfil.: 6 CFM SE-Wall-15B15-Ow-9 10 X 102 101.7 0.047 16 364 0.1 0 7 SW- Wall- 15B15 -Ow -8 13 X 10.2 1162 0.047 3.5 410 O.1 0 NW -Wall- 15815 -Ow -9 10 X 102 101.7 0.047 3.6 364 0.1 0 7 - Wall - 151315 -0w -9 7.5 X 102 76.5 0.047 3.6 274 0.1 0 5 NW- Wall - 151315 -Ow -9 7.7 X 102 78 0.047 3.6 279 0.1 0 5 SE- Wall- 15B11 -Ow -9 7.3 X 10.2 74.5 0.051 3.9 292 0.1 0 7 NE- Wall - 15515 -Ow -9 31.5 X 320.4 0.047 3 .6 1,148 0.1 0 22 10.2 SE -Wall- 151315 -Ow -917.8 X 165.3 0.047 3.3 552 0,0 0 3 10.2 SW- Gls- Atrium shgc -0.33 O %S 16 0.310 21.4 342 30.8 0 492 SE- GIs- Atriurn shgc -0.33 O %S 16 0.310 21.4 342 30.8 0 492 Floor- 21A -32 1 X 928.9 . 928 0 . 020 ._. » 1 .4 1,282 .. 0.0 O w _ 1 Subtotals for Structure: 6,196 0 1,058 lnfil.: Win.: 6.2, Sum.: 6.2 158 2.422 383 0.563 -134 89 Ductwork: 693 82 a AED Excursion: 93 Room Totals: 7,272 -134 1,321 s':\ .., \Plan 5057.rhv Wednesday, February 12, 2014, 8:08 AM Room Length: 14.3 ft. System Number: 1 Room Width: 12.3 ft. Zone Number: 1 0.1 Area: 177.3 sq.ft. Supply Air: 35 CFM Ceiling eight: 102 ft. Supply Air Changes: 12 AC/hr Volume: 1,796.0 cu.ft. Req. Vent. Gig; 0 CFM Number of Registers: 1 0.0 _ _. Actual Winter Vent.: 0 CFM 1,492 Percent of Supply.: 0 425 Inf €l.. Win.: 1.7, Sum.: 1.7 44 2.419 Actual Summer Vent.: 0 CFM 25 Ductwork. Percent of Supply: 0 % 32 AED Excursion. ......... _ ..._. .. ...,..__ .... ... ..... ... .... _,.... .,.......... Actual Winter Infl.: 2 CFM ,_...... ,, .... _.. ...., ,, ,.. .,... 3 6 Actual Summer Infil.: 2 CFM 10.2 NW -Wall- 15815 -Ow -8 12.3 X 109.4 0.047 3.5 384 0.1 0 6 10.2 NW -CIs- Atrium shgc -0.33 0 %S 16 0.310 21.4 342 25.6 0 409 Floor -21A -321 X w 176. 176 8 0.020 �e 1.4 .� _ 0.0 _ _. _ _.0 0 n Subtotals for Structure: 1,492 0 425 Inf €l.. Win.: 1.7, Sum.: 1.7 44 2.419 106 0.570 -37 25 Ductwork. 166 32 AED Excursion. ......... _ ..._. .. ...,..__ .... ... ..... ... .... _,.... .,.......... -1 ....... ,._,......... ........., ... ..... ....._ .., .., .. r,.. ....,., .,. ..< _ .. ,_...... ,, .... _.. ...., ,, ,.. .,... 3 6 Room Totals. 1,766 -7 518 Y :t ...Plan 5O5.rhv Wednesday, February 12, 2014, 8:08 AM Calculation Mode: Ht:- & c1q. Occurrences: 1 Room Length : 9.2 ft. System Number: 1 Room Width: 5.2 ft. Zone Number: 1 Area: 47.0 sq.ft. Supply Air: 6 CFM Ceiling Height: 10.2 ft. Supply Air Changes: 0.7 AC/hr Volume: 452.0 ou.ft. Req, Vent. Clq: 0 CFM ( Number of Registers: 1 Actual Winter Vent.: 0 CFM 3 Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM ! Percent of Supply: 0 % l Actual Winter Infil.: 0 CFM Actual Summer Infil.: 0 CFM 4 NW- Wall- 151315.0w -9 5.2 X 10.2 52.6 0.047 8.6 188 0.1 0 Floor 21 A-32 1 X 47 4 _� �.�_e �_ 47.4 . _. _. 020 1 4 65 0.0 _ �..,,. .... ��. _ - .w.-- � ,.. ._,.a..,.r . . n..,.. 0 .,_ . ed .. ,.._..., 0 Subtotals for Structure.' 250 0 4 Infil.: Win.: 0.2, Sum.: 0.2 6 2.377 15 0.63 -0 4 Ductwork: 28 1 AED Excursion; ... ..... . 1 Room Totals: 206 5 1 i E E 4, i i i i E t Y :\ ...\Plan 5057.rhv Wednesday, February 12, 2014,8:05 AM Q-1° ' Room Length. 321 .8 ft. System Number: 1 Room Width. 1.0 ft. Zone Number: 1 Area: 322.0 sq.ft. Supply Air: 62 CFM Ceiling Height: 102 ft. Supply Air Changes. 1.1 AC /hr Volume. 3,271.0 cu.ft. Req. Vent. Cig. 0 CFM Number of Registers. 1 Actual Winter Vent.. 0 CFM Percent of Supply.: 0 % Actual Summer Vent.. 0 CFM Percent of Supply. 0 % Actual Winter lnfil., 3 CFM Actual Summer Infil.. 3 CFM NW -Wall- Basement R11 -9 201.3 206.8 0.051 3.7 757 0.1 0 12 X 10.2 NF- Wall - basement R11 -9 12.3 125.4 0.051 3.7 459 0.1 0 8 X 10.2 SF- Wall - Basement R11 -9 8.5 X 86.4 0,051 3.7 316 0.1 0 5 10.2 I NF -Wall- Basement R11 -9 6 X 61 0.051 3.7 223 0.1 0 4 10.2 Sly -Wall- Basement R11 -9 11.8 120.3 0.051 3.7 440 0.1 0 7 1 10.2 2 _ .8 ......321,__ 0.020 1.4 444 0.0 _. . 0 Subtotals for St ucture 2,639 0 3 6 Infl.. Win.. 2.8, Sum.. 2.8 72 2.417 174 0.556 -61 40 Ductwork. 296 5 I AEI Excursion.. _ 6„ Room Totals. 3,109 -61 88 3 i { 1 i I ---_ ----------- f 3 I a. �.l ... \Plan 50 7.rhv Wednesday, February 12, 2014, 8:08 AM Calculation Mode. Htg. & c1g. 0.065 Occurrences: 1 4.7 Room Length: 151.8 ft. System Dumber. 1 21.4 Room Width: 1.0 ft. Zone Dumber. 1 12 # Area. 152.4 sq.ft. Supply Air. 57 CFM Ceiling eight: 14.2 ft. Supply Air Changes: 2.5 AC/hr Volume; 1,543.4 cu.ft. Req. Vent. talg. 0 CFM Dumber of Registers. 2 4 Actual Winter Vent., 0 CFM 2.422 881 Percent of Supply.: 0 % Ductwork: Actual Summer Vent.. 0 CFM w 98 AED Excursion: Percent of Supply, 0 % Actual Winter Infil.: 11 CFM [ 2,724 Actual Summer Infil.. 11 C:FM SE- Wall- 12F -4sw 11.8 X 14.2 114.3 0.065 4.5 495 4.7 0 81 S -Gals- Atrium shgc -0.33 0 %S 12 0,310 21.4 257 30.8 , 0 384 SW- GIs - Atrium shgc -4.33 4 %S 12 0.310 21 A 257 30.8 0 359 SE tale Afirium shgc 0.33 0 %S 1. 0 314 21 4 _ . ,_,.... 214 .. �._ �._. ,. 30 7 , ,_w. -- -,.._., 0 347 Subtotals for Structure: 1,844 4 1,220 Infil.: Win.: 14.8, Sum.; 14..8 273 2.422 881 4.581 -231 153 f Ductwork: 259 98 AED Excursion: 111 3 Room Totals: 2,724 -231 1,582 I �:\ ...\Plan 5057.rhv Wednesday, February 12, 2014, 8:08 AM <1 13.2 ft. System Number: 1 01 6.0 ft. Zone Number: 1 0.161 11.1 79.0 sq.ft. Supply Air: 35 CFM } 10.2 ft. supply Air Changes: 2.6 AC/hr 803.0 'cu.ft. Req. Vent. Clq: 0 CFM 1 0 Actual Winter Vent.: 0 CFM 2,421 472 Percent of Supply.. 0 % Ductwork: Actual Summer Vent.: 0 CFM 39 Percent of Supply. 0 % ...� �......_.... __ , , .. . Actual Winter lnfil.: 8 CF Actual Summer lnfil.: 8 CFM € SF- Wall- 12F -0sw 6 X 10.2 53 0.065 4.5 238 01 0 39 NE-Door-R6.2 Door 2.7 X 6.7 17.8 0.161 11.1 198 3.5 0 63 SF -GIs- Atrium sh 0.33 O %S 8 0316 21.4 171 30,8 0 246 1 Subtotals for Structure: 1,128 0 433 lnfil.: Win.: 7.6, Sum.: 7.6 195 2,421 472 0.559 -165 109 Ductwork: 168 39 AFD Excursion ... _ - ........... _ e_ ...,_..�.a u......... _.,. ..��._: ...� �......_.... __ , , .. . ... 44 i _..,..._,... Prom Totals: 1,768 -165 624° , i l Y:\ ...\Plan 5057.rhv Wednesday, February 12, 2014, 8:08 AM Room Length; 398.6 ft. System Number. 1 0.7; Room Width. 1.0 ;ft. Zane Number: 1 4.5 Area. 399.0 sq.ft. Supply Air: 285 CFM Ceiling Height: 10.2 ft. Supply Air Changes: 4.2 AC/hr ! Volume; 4,053.0 cu.ft. ' Req. Vent. Clg: 0 CFM Number of Registers: 4 SW -Gls- Atrium shgc -0:33 O %S Actual Winter Vent.;. 0 CFM I 321 30.7 0 Percent of Supply,: 0 % 0.310 21.4 3:21 Actual Summer Vent.; 0 CFM NW -GIs- Atrium shgc -0.33 O %S 64 0310 Percent of Supply: 0 % 0 1,636 SF- Gls- Atrium shgc -0.33 O %S Actual Winter Infil,: 19 CFM 321 30.7 0 Actual Summer Infil.: 19 CFM NW- Wall- 12F -Osw 10.1 X 102 38.5 3,088 4.5 1 73 0.7; 0 28 NF- Wall- 12F -Osw 14.8'X 102 150:8 0.005 4.5 676 0.7 0 111 SF- Wall- 12F -Osw 9.9 X 10.2 70.7 0.455 4.5 317 0.7 0 52 SW -Gals- Atrium shgc -0.33 O %S 15 0310 21.4 321 30.7 0 451 SW -Gls- Atrium shgc -0:33 O %S 15 0.310 21.4 321 30.7 0 461 SW -GIs- Atrium shgc -0.33 O %S 15 0.310 21.4 3:21 301 0 451 NW -GIs- Atrium shgc -0.33 O %S 64 0310 21.4 1,359 25.6 ; 0 1,636 SF- Gls- Atrium shgc -0.33 O %S 15 0.310 21.4 321 30.7 0 461 SE- Gls- Atrium shgc -0.33 0 %S 15 0.310 21.4 321 30.7 0 461 UP -Cell- 1613-38 128.3 X 1 128.3 0.026 1.8 230 1. 0 .... .. 15:3 Subtotals for Structure. 4,761 0 4,349 Infil.. Win.. 19.0, Sum.. 19.0 486 2.421 1,177 0.561 -412 273 Ductwork. 625 414 AD Excursion. 472 ISqu�pent - -------- _ . _.... 0 1,2Q 0 wa . Room Totals. 6,563 -412 6,708 S t i � i I Y:i ...\Plan 50.rhv Wednesday, February 12, 2014, 8.08 AM Ql ) } � � � � � K3 «\Plan° 5057.rhv Wednesday February j 2 204 +08 4Q . © # -� w ~^ ■: ?�, :�.:� , - , �: \�. \- ©�# » . ® \, -< 4 ■ « « � � -t ® <� ©4� ■ !, 2 ■ w : ■ ° ,�< , ■�: � « � - «, «» ,: a \� ■�: �§ #!! ■ # ,& \!w i ■ 4 !! » ,� ■ ■ ^� \ \ \� «« � a \� : ■. 2 , tl� : « i t , a: \ �� ? / < #°,w a�, • <� !< < <�. /� © «, # ° \!!,< , ■.4 ��. : !r ! -. ,. / . : , 4 \. ■!_: ■ ;# \ � � � ! � &> < 4 4 2 � . ■ ^ �!. f -lt! ■■ �4- » 4 <y « ■t : * ■■ !,! - ■� v � < « ) } � � � � � K3 «\Plan° 5057.rhv Wednesday February j 2 204 +08 4Q Room Length: 8.5 ft. System Number :: 1 345 Room Width: 5.7 ft. Zone Number: 1 3 2 1 Area: 48,0 sg,ft. Supply Air: 11 CM Ceiling Height: 10.2 ft. Supply Air Changes: 1.3 AC /hr Volume: 490,0 cu.ft. Rey{. dent. Cl g: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent..: 0 CFM Percent of Supply: 0 °lam Actual Winter lnfl.: 2 CFM Actual Summer lnfil.: 2 CFM I. P- Cell - 1613- 8 48.2 X'1 48.2 0.926 1,8 �.� _,... ._.z. ._ _...w .�.,���.. _.. w._.._,. _..,�..,w. ,_,.._.:.._ 86 ... ...w:. 1.2 0 _..e. _,.,.�, �.� 58 ._....,..— - .I Subtotals for Structure: 345 0 1010 lnfil.: Win.: 2.3, Sum.: 2.3 58 2.428 140 0.555 -49 3 2 1 Ductwork: 51 9 AED Excursion: �� . � e 11 f Room Totals: 536 -49 152 1 1 I I f :.. \Plan 5O57,rhv Wednesday, February 12, 2014, 8:018 AM 1 � �. � ' Z V. . h. nS � 1 ,, i. 'Y ll t sa "? t i ,,.,>� � jV . ,, \n ,. � \s,. a \# t u �, ix •"a� Y . SGt F M1 '. 1� m Loads Roam 10 14q Load rtr Calculation Mode: Ntg. & clg. Occurrences: Loom length : 178.8 ft. System Number: 1 Room Width: 1,0 ft. None Number: 1 Area: 179.0 sq.ft. Supply Air: 87 CFM I Ceiling Height: 10.2 ft. Supply Air Changes: 2.9 AC/hr Volume: 1,818.0 cu.ft. Reg. Vent. Clg: 8 CFM Number of Registers: 2 Actual Winter Vent.: Percent of Supply.: f CF 0 °IQ Actual Summer Vert.: 0 CFM Percent of Supply: 0 % Actual Winter lnfil.: 14 CFM Actual Summer lnfil_: 14 CFI I NW Wail- 2F -OSw 14. 10.E 132::5 0.065 4.5 504 C�.7 ' O 97 I NE 2F 12.3 X 192 105.4 0.065 4.5 473 0.7 0 77 SF- Wall- 12FROsw 8.5 X 10.2 86.1 0,065 4.5 386 0.7 : 0 63 s NW -GIs- Atrium shgc -0.33 O °IBS 15 0.310 21.4 321 25.6 0 384 N- GIs - Atrium shgc -0.33 O %S 20 0.310 21.4 428 25.6 0 511 ° UP- eel 8 1 17 . � _ �}, d , w 1 . 8 _. � ,3,21 m 1. _ e . _ ,-_ O' e r 1 ._ .e 11 _ Subtotals for Structure: 2,528 0 1 , 3 4 6 lnfil.. Win.. 14.0, Sum.: 14.0 359 2.421 869 0.563 °304 202 Ductwork. 357 126 l AFl3 Excursion. 144 People: 200 latiper, 230 sen /per , , _ _ .g. _ .,. m_,e. __._, 200 m 230 Totals. 3,749 -104 2,048 L___ Y:\ ... \Plan 5057.rhv Wednesday, February 12, 2014, 8:08 AM Room Length. 91 .7 ft. System Number: 1 0 Room Width: 1.0 ft. Zone Number: 1 3.5 Area: 92.9 s.ft. Supply Air. 34 CFM Ceiling Height: 10.2 fit. Supply Air Changes: 2.2 AC /hr Volume: 932.0 cu.ft Re. Venn Clg: 0 CFM Number of Registers: 1 0.562 Actual Winter Vert.: 0 CM 163 Percent of Supply.: 0 % AED Excursion: Actual Summer Vent.: 0 CFM 33 1 Percent of Supply: 0 °l Actual Winter €nfil.: 7 CFM Actual Summer lnfil.: 7 CFM SE- Wall- 12E -0w 11.7 X 10.2 118.7 0.065 4.5 532 0.7 0 87 1 NE Door 3 X 8 24 0.161 11.1 267 3.5 0 85 ! UP-C il -1.6 8 5 1; _ _e 85 �_ O} 02 i _ _. 1. 1.5 . . 1 0 10 Subtotals for Structure: 1,117 0 301 lnfil.: Win.: 7.0, Sum.: 7.0 180 2.421 435 0.562 -152 101 Ductwork: 163 29 AED Excursion: 33 1 Roam Totals: 1,715 =152 463 Y :\ :.. \Plan 5057.rhv Wednesday; February 12, 2014 8:08 AM Q:�) ':\ ...\Plan 5057.rhv Wednesday, February 12, 2414 :08 AM I Room Length: 180.9 ft. System Number: 1 180.9 0.026 1.8 325 12 Room Width: 1.0 ft. Zone Number: 1 788 Area: 181.0 sq.ft. Supply Air: 42 CFM Gelling Height; 9.1 ft. Supply Air Changes: 1.5 AC/hr Volume: 1,644.O cu,ft. Req. Vent. Clg: 0 CFM Number of registers:. 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 5 CFM Actual Summer Infil.. 5 CFM SW -GIs- Atrium shgc -0.33 O %S 16 0.310 21.4 342 00.0 0 492 I UP -Cell- 1613-38 160.9 X 1 180.9 0.026 1.8 325 12 0 216 I Subtotals for Structure: 1,158 0 788 Infil.: Win.: 4.9, Sum.: 4.9 126 2.421 304 0.557 -106 70 € Ductwork: 154 6 AFB? Excursion: 70 I Room Totals: 1,616 -106 989 t t 1 i i s Y:L ... \Flan 5057.rhv Wednesday, February 12, 2014; 8 :08 AM Q Room Length: 5.3 ft. System Number: 1 Room Width: 13.3 fit. Zone Number: 1 Area: 71.0 sq.ft. Supply Air: 10 CFM € Ceiling Height: 9.1 ft. Supply Air Changes: 1.0 AC/hr Volume: 645.0 cu.ft. Req. Vent, Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 2 CF Actual Summer Infil.: 2 CFM SW- Wa11- 12F -Os 5,3 9.1 48.4 0.065 4.5 217 0.7 0 36 i UP - Ceti 1 R 38 71.1 X: _ _�.'_ 71..1 . , _ ,0.026 1 8 1 8_ 1.2 . .....: , .. .. m. . ..� _.._ ., � �.w� Subtotals for Structure: 345 0 121 l Infil.. Win.. 1.9, Sum.: 1.9 48 2,416 117 0.558 -41 27 Ductwork: 49 11 AED Excursion: 1 Room Totals: 511 41 171 f I (:\ ... \flan 5057.rhv Wednesday, February 12, 2014, 8:08 AM 191.3 ft. System Number: 1 808 1.0 ft. ,Zone Number: 1 20 191.9 sq.ft. Supply Air: 80 CFM 9.1 'ft. Supply Air Changes: 2.8 AC /hr 1,788.0 eu.ft. Req. Vent. Clg: 0 CFM 2 w. 0.026 Actual Winter Vent.: 0 CFM 229 Percent of Supply.: 0 % 2,018 Actual Summer Vent.: 0 CFM Infil.: Win.: 10.2, Sum.: 10.2 260 Percent of Supply: 0 °lam 0.561 -220 Actual Winter Infil.: 10 CFM Actual Summer Infil.: 10 CFM NW- Wall -12 -Osw 13:5 X 9.1 112.6 0.065 4.5 808 0.7 0 83 S - CPIs- Atriurn shgc -0:33 O %S 20 0310 21.4 428 30.8 0 615 NW -GIs- Atrium shgc -0.33 O %S 10 0310 21 A 214 25,5 0 255 3 P- Ceil -1613 8 191.3 X 1 ..__:.,_. ..:. 191.3 w. 0.026 . .41. 343 .� . . .._ 1.2 229 Subtotals for Structure. 2,018 0 1,269 Infil.: Win.: 10.2, Sum.: 10.2 260 2.420 630 0.561 -220 146 Ductwork: 279 117 AED Excursion: 133 x People; 200 lat/per, 230 sen /per: 1 200 .. ..11.11 230 .. Room Totals: 2,927 -20 1,895 i I 3 I i I 1 a 1 1 I3 l 3 YA ... \Plan 5057.rhv Wednesday, February 12, 2014, 8:08 AM 0/1 P l f f P Y:\ ...\Plan 5057.rhv Wednesday, February 12, 2014, 8:08 A 1 1 i 1 A P l f f P Y:\ ...\Plan 5057.rhv Wednesday, February 12, 2014, 8:08 A Room Length: 2692 ft. System Number: 1 Room Width: 1.0 ft. Zone Number: 1 Area: 269.0 sq.ft. Supply Air: 93 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 2.3 A Volume: 2,445.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 2 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CF Percent of Supply: 0 % Actual Winter lnfil,: 11 CFM Actual Summer lnfil.: 11 CFM I NW -Wall- 121 = -Osw 7.8'X 9:1 62.1 0.065 4.5 279 0.7 0 46 NF- Wall- 12F -Osw 11.7 X 9.1 94 0.065 4.5 421 0.7 0 69 NW - Wall -12F-O w 1.1 X 9.1 10.4 0.065 4.5 46 0.7 0 8 I NE- Wall -12 -Osw 10.7 X 9A 76.9 0.065 4.5 354 0.7 0 58 NW -GIs- Atrium shgcp0.33 O %oS 9 0.310 21.4 193 25.6 0 230 NF -Gis- Atrium shgc -0.33 O %S 6 0.310 214 123 25.5 0 153 NF- GIs - Atrium shgc -0.33 O %S 6 0310 21.4 128 25.5 0 153 NF -GIs- Atrium hgc -0;33 O %S 6 0.310 21.4 128 25.5 0 153 NE-Gls- Atrium shgc -0.33 O %S 6 0.310 21.4 128 25.5 0 153 Nl -Gls- Atrium shgca0.33 O %S 6 0.310 21.4 128 25.5 0 153 UP -Ceil- 1613-38 269.2 X 1 269.2 0.026 1.8 483 1.2 0 322 Floor- 20P -30 1 X 35 3 - -111- _ . _.. ..... -.... _... 35 . ..w ,,..,� ... 0.035 2.4 85 _ .......... 1111 ._ �.. �... 0.2 __ 11,11.... 0 ,.. .. 7 ------ Subtotals for Structure: 2,501 0 1,505 lnfil.. Win.: 11.1, Surn.: 11.1 284 2.420 688 0.563 241 160 Ductwork: 336 135 AED Excursion: 154 People: 200 lot /per, 230 sen /per: 1 200 230 Room Totals, 3,525 -41 2,183 x i 1 Y:l ... \Plan 5057.rhv Room Length. 188.6 ft. System Number. 1 s Room Width, 1.0 ft. Zone Number. 1 I Area: 189.0 sq,ft. Supply Air: 51 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 1.8 AC/hr Volume: 1,713.0 cu.ft. Req, vent. Clg: 0 CFM Number of Registers: 2 UP- Cell- 16s -38 188.6 X 1 Actual Winter Vent.: 0 CFM 338 1.2 0 Percent of Supply.: 0 % w.3 03 . _..._ 4 .4._..� 434 Actual Summer Vent.: 9 CFM Subtotals for Structure: Percent of supply: 0 % 0 747" Infil.: Win.: 7.2, Sum.: 7.2 Actual Winter Infil.: 7 CFM 447 0.563 -156 Actual S ummer Infil.: 7 CFM NE- Well- 12F -0sw 16.2 X 9.1 132.8 0.065 4.5 596 01 0 8 SS- Wall- 12F -0sw 2.2 X 9.1 19:8 0.065 4.5 88 07 0 14 € NF- GIs - Atrium hgc -0.83 0 °IBS 7 0.310 21.4 150 25.5 0 179 j NF -GIs- Atrium shgc -0:33 O%S 7 0 310 21.4 150 25.6 0 1" UP- Cell- 16s -38 188.6 X 1 188.6 0.026 1,8 338 1.2 0 226 I Igor - 0P - 30 1 X 179 �... 179 7 w.3 03 . _..._ 4 .4._..� 434 m _ 0. 2 0 ._ :... 33 Subtotals for Structure: 1,838 0 747" Infil.: Win.: 7.2, Sum.: 7.2 185 2.421 447 0.563 -156 104 Ductwork: 241 61 l AED Excursion: _-- __........ __x..... -.. ......... ..... w...—...... 69 ..w 5 Room Totals: 2,526 -156 980 I l t I { E I i i °s Y :t ...\Plan 5057.rhv Wednesday, February 12, 2014, 8 :08 AM Room length: 5.3 ft. System Number: 1 Room Width: 9.5 ft. Zone Number: 1 Area: 51.0 s .ft. Supply Air: 25 CFM Ceiling Height: 0.1 ft. Supply Air Changes: 3.3 AC/ hr � Volume: 453.01 cu.ft. Re q, Vent, Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 5 CFM Actual Summer Infil.: 5 CFM NF- Wall- 12F -Osw 5.3 X 0.1 48.4 0.065 4.5 217 0.7 " 0 36 SF- Wall- 12F -Osw 0.5 X 0.1 85.3 0.065 4,5 :387 0.7 0 63 UP -CeiI- 1513-38 50.7 X 1 50.7 0.026 1.8 91 1.2 0 61 Floor -2P -30 1 X 40.5 49 0 035 .4 128 0 2 0 1,03 Subtotals for Structure: 815 0 170` €nfil„ Win.: 5.3, Sum.: 5.3 135 2.421 325 0.564 -114 76 Ductwork: 120 17 AED F urs on �_. __. ............ .... �:M. 0 Room Totals: _,..,_._..__._ ......_... ,. ...,.„._.,W..„.. . ..._,..,,.._ e „....: ,.w.,_�...;.... ...,.. _ ..,._,. _ .,_.,._.,...,, 1,261 m., _ .:, �.d....w......, :. .. ., _... , . ..._ „,....,.. .......... "114 , _ ......:......_„ 283 yy S 9 4 x I I I { ., .:_.,,....,...__a Y:\ ... \Plan 5O57.rhv Wednesday, February 12, 2014, 8:08 AM Calculation - Mode: Htg. & c10. 0310 21.4 Occurrences: I 0 Room Length: 6.0 ft. System Number: 1 1.2 Room Width: 9.7 t Zone Number: I 127 ....... ... .. .. .. Area: 58.0 sq.ft. Supply Air: 16 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 1,8 AC/hr Volume: 527.0 cuft Req. Vent. Cl: 0 CFM Number of Registers: I 75 Actual Winter Vent.: 0 CFM AED Excursion: .......... Percent of Supply.: 0 % 24 Room Totals: Actual Summer Vent.: 0 CFM .46 346 Percent of Supply: 0 % Actual Winter Infil.: 2 CFM Actual Summer Infil.: 2 CFM NE-Gls-Atrium shgc-0.33 O%S 6 0310 21.4 128 25.5 0 153 UP-Cell-1613-38 58 X 1 58 0M6 1.8 104 1.2 0 69 Floor-20P-30 I X 52.5 52.5 OM5 2.4 ... . . .. ....... . 127 ....... ... .. .. .. 0.2 . . . . .... . ...... .. .. .. .... . .. 1111-11-11-111 ........... .. .. 0 11 Subtotals for Structure: 576 0 269 Infil.: Win.: 2.1, Sum.: 2.1 54 2.423 132 0.569 -46 31 Ductwork: 75 21 AED Excursion: .......... . .. ........ ... 24 Room Totals: 783 .46 346 I Rec Room 929 7,272 145 7,7 1,321 -134 73 145 BR 5 177 1,766 35 5; 518 -37 29 35 3 Bath 4 47 296 6 4 9 -5 1 6 4 Mech/ Storage 322 3,109 62 5 88 -61 5 62 5 Project Rm 152 2,720 54 6,6 1,582 -231 88 67 ' 6 Mud Room 79 1,766 35 6 624 -165 35 35 7 Kitchen /Nook 399 6,563 131 7,7,7,7 6,706 °412 373 265 8 Great Room 527 5,916 116 7,7,7 - 3,916 -101 213 166 9 Bath 3 48 536 11 4 - 152 -49 8 11 10 BR4 /Opt Study 179 3,749 75 7,7 - 2,048 -104 114 87 i 11 Entry 92 1,715 34 5 - 463 -152 26 34 12 Mauer BR 276 4,199 84 7,7,7 - 3,679 -50 205 156 13 BR2 181 1,616 32 7 a 989 -106 55 42 14 Bath 2 71 511 10 4 - 171 -41 9 10 15 BR 3 191 2,927 59 7,7 - 1,895 -20 105 80 16 laundry 61 523 10 4 - 311 -2 17 13 17 Library 259 3,525 71 6,6 2,183 -41 121 93 18 Mauer Bath 189 2,526 51 6,6 - 980 -156 55 51 19 WIC 1 51 1,261 25 5 - 283 -114 16 25 0 WIG 2 58 783 16 4 - 346 _46 19 16 Humidification 2,309 Duct Latent -217 Sy t m _1. total 4,298 55,590 1,06 _. _ , ._ . ... 28 , 7 . 2,274 w 1,57 _ _ 1,200 System 1 Main Trunk Size: 25x10 in Velocity: ` 690 ft. /miry Loss per 100 ft.: 0.043 in:wg Duct size results above are from Manual D Ductsize. Runout duct velocities are not printed with duct size results from Manual D Ductsize since they can vary within I the rnnm. qpp the Mgntjgl D II(It i7p r€ nnrt for rftrnt vP1n6tia.-q anri nthr.r r3 tq Type: Model: Indoor Model: Brand: Carrier 13 SEED PURON A ' Natural Gas or Propane Furnace 92.1 AFUE 13 SEER 75000 33000 n/a 33,000 Btuh n/a 0 Btuh n/a 6305468 Y :\ ...\Plan 50 7.rhv Wednesday, February 12 2014, 8:08 AM - I System 1: 1,521 27,349 -2,273 2.26 I 90 Southeast 1,469 26,421 -2,273 2.20 Zone 1: 1,290 23,192 -2,273 1.93 180 Southwest 1,428 25,677 -2,273 2.14 1 Rec Room *145 145 145 145 145 145 145 145 7, 2 BR 5 35 35 35 *37 35 35 35 37 6 9 3 Bath 4 *6 6 6 6 6 6 6 6 4 1 4 Mechl Storage *62 62 62 62 62 62 62 62 5 Project Rm 88 *89 77 58 71 78 79 67 6,6 6 Mud Room *35 35 35 35 35 35 35 35 6 Kitchen /Nook *373 309 347 348 344 299 357 365 7,7,7,7 8 Great Room 218 *227 192 144 189 215 207 168 7,7 „7 I 9 Rath 3 *11 11 11 11 11 11 11 11 4 10 BR4 /Opt Study 114 115 117 107 *117 112 110 99 7,7 11 Entry *34 34 34 34 34 34 34 34 5 12 Master BR *265 204 182 142 167 178 182 161 7,7,7 13 13112 55 *61 48 33 46 56 5 1 39 7 14 Bath 2 *10 10 10 10 10 10 10 10 4 15 BR 3 *105 104 96 82 95 100 101 90 7,7 16 Laundry 17 12 17 *20 18 ` 13 18 20 4 17 Library 121 *135 127 106 125 128 116 94 6;6 18 Master Bath 55 *65 57 51 55 60 51 51 6,6 19 WIC 1 *25 25 25 25 25 25 25 25 5 20 WIC 2 19 *24 21 16 20 22 18 16 4 * Indicates highest CPM of all rotations. R 5° Bast 1,521 27,349 -2,273 2.26 I 90 Southeast 1,469 26,421 -2,273 2.20 135 South 1,290 23,192 -2,273 1.93 180 Southwest 1,428 25,677 -2,273 2.14 225 West 1,420 25,529 _2,273 2.13 I 270 Northwest 1,474 26,507 -2,273 2.21 I 315 North 1,349 24,264 ®2,273 2.02 * Indicates highest value of all rotations. f i Y:\ .,. \Plan 5057 rhv Wednesday, February 12, 2014, 8:08 AM :l :.. \Plan 0007.rhv Wednesday, February 12; 2014, 0:08 A Y":\ ... \Pl n 5057.rhv Wednesday, February 12, 2014, 8:08 AM Manual S, D, Standard Pacific, Fireside Plan 5057 Air Conditioner = Carrier Model CA13NA036* ** (A,B) (3 Ton) Evaporator Call = Carder Model CNPV *4221A1_ * +TI R (3.5 Ton) Duct Summary » « d » « « » p » »» « .- » « « MOM » » » Furnace Neat Rise --Used 58 Degrees on Program WIN , , o r wa Furnace Neat Rise --Used 58 Degrees on Program SPECIFICATIO • . x,: 'a a :.. a � `�' �� SYt. 9 '.` ! # kT�9 # A �� # u�w k`�,�� ': k w * P #t ■[�1 �iw ` 6�'DT% y'e`a d �,rS F'd aenw r }�;%y �$ t �" # % # "# nwwe d�3 Y3 iF�'#� wow+ 8�8',�° t * d `t C.�` �# MBA:# ws®r r Mai # at w„ s sums i »"`'���iJ #�y�"# PERFORnANCE D (coot( COIL STATIC, PRESSURE DROP (in wt. ) PLRC?N6 AN R-22 REFWGE 100 1100 1 ! 1 wo I S 1 Lim 11900 115 1 am 11 �. .111 �., � 1 Vkt 0.0% 0,139 0.103 02 3 11.277 241 r.Q7C1 Ca 111 9.143 0,19 d 23 CP. &9. wet Cky 0. o. , n: 11.113 0.1 0.1713 2417 Vkt 0,064 0,091 0122 0.154} 9,t 0124 0 414 9, 7 (3,135 0,173 �� �.� wet .7 0,111 .14s . 1 1 . 3017 vm 3647 1 010% fl4T9 41.1 7 .1 Q,1 Q. 3 1 d1.13 1 .. Ct, ta.fl 11111 1 C?.1 1 2411 t :, 04ww 0,161 111 1 11 0. 0.319 Sd. 1 C}.tD# A 9 1 9,1 b,1 ti 92! 319 x i #. 4L1 13 111 9.F' 136 'tl.1 ,1 2 d4.1 91#1 t1 1 C1 Twu Detailed Cooling Capacities DETAILED COOLING CAPACITIES# CONTINUE 4 C5#d At1 EVAPORATOR MR Em TOW TOW Tx* °? TOW * T X3,42 44 31,97 29.75 < 4 a V1 I sr� 1. 135D snr— Sensible Tat Gain = 8260 BTUs AC Delivers 30890 BTUs 28260/3089 = ,924 or 8.6% over Ct4 n on * , 13 SEER PURON A CARRIER AIR CONDITIONIN of 33 yyµµ Y#� ,. it espa* ,., g .., .y q. ., 3 R ' Manual S, D, Standard Pacific, Fireside Plan 5057 Equipment: Furnace = Carrier Model 59SC2BO8OS21--20 (800 00 BTU) Air Conditioner = Carrier Model CA13NA036****(A,B) (3 Ton) Evaporator Coil = Carrier Model CNPV*4221AL*+TDR (3.5 Ton m8mblumm a irg 11 a um I wx w a$ I-11i'mKI (9� > SPECIFICATI x a s Furnace Blower Data Furnace Blower Data � ` <. •' ".. ... � e: ° iF'�a a. � "a* � - �` t�; s" B C . +�T.:Pq ,«� n #�_ oh m n ♦ v * $ v T* U r . Imm lY2 ■■y■■■(! y ■� y ■ 1 ��XY 1 PERFORMANCE T3,r�.'T° (tout) , COIL STAT1C PRESSURE DROP ;(in ire.) PURON40 A R -22 ER 7874 0'096 2474 24417 3114 '078 81.484 .9 8 B0 8' 31a 367. Tul? wet 0J 1 0,144 0, @ ,"2 1017 10 10.13 T T 4024 MY 7 11 .1 1 0.140 .7 1 84 4 sm e 741 0. 87.131 81.7 8.7 3,211 D etailed Cooling Capacities r° D ETAI LE D COOLING CAPACITIES# CAPACITIES CONTI EVAPORATOR AIR OS i*09. 1 4) Ewe capedty M" Tost WASKYAMI 2JR 1Q W34 12 94 7? 1 2.� .fi .! 129 Sensible Feat Gain = 28260 BTUs AC Delivers 30890 BTUs 28260/30890 - .934 or 8.6 over SEER PURON A CARRIER AIR CONDITIONING on t"Wity 33000 i€ :* ,,. 0 6395468 < -01 Geotechnical and Environmental Consultants 0 303-759-8100 Fax 303-756-2920 wwwagwassenaarcom As requested, we have performed a soil and foundation study at the subject site. The purpose of our study was to observe subsurface conditions encountered and to recommend geotechnical design criteria for the design and construction of the foundation for the proposed residence. This letter presents a summary of our findings and recommendations. 11*10) it'll 102MM= MEN= Sand and Gravel, medium dense to brown "I A P P R 0 ",,"?, 1. l ' Subject to Fjeldllr�sper,r ;ons F-T MOM= in Wheat Ridge BLiiIdif' tDt t, ?Aql� 1 Date, ;nod,// AM 1 cry Cry Standard Pacific of Colorado, Inc. Project Number 135271 January 31, 2014 Page 2 M Standard Pacific of Colorado, Inc. Project Number 135271 January 31, 2014 Page 3 a o s s n I T LTRITT a joint which allows free vertical movement of the stab. 2. Slab bearing partitions should be constructed with a minimum 2-inch void space. Stairways bearing upon the slab should be constructed in such a way as to allow at least 2 inches of slab heave. In the event of slab heave, the movement should not be transmitted directly through the partitions to the remainder of the residence. I MERU iT: I T rmy'snun 1 ir MMMGMMM��I' M-M :'MI* 4 Where a forced-air heating system is used and the furnace is located on the slab, we recommend provision for a collapsible connection between the furnace and the duct work to allow for at least 3 inches of slab heave. Utility connections should also be provided with flexible connections capable of accommodating the same magnitude of movement as specified above. Following these recommendations will reduce immediate damage caused by movement of the floor slab; however, the void spaces recommended are not intended to predict total slab movement. Care should be taken to monitor and reestablish partition voids and flexible connections when necessary. We are available to provide further consultation regarding basement slab performance risk assessments. M Standard Pacific of Colorado, Inc. Project Number 135271 January 31, 2014 Page 4 V MO, During construction, the crawl space area should be checked for standing water • very moist conditions, construction debris, and other deleterious materials. If these conditions exist, the area should be evaluated and mitigated, as necessary. grade area. The purpose of the drain is �o collect water which may become trapped on the surface • the excavation and enter the basement • crawl space areas. A drain should • constructed similar to the attached drain detail (Figure 1) and should be uniformly sloped to a positive gravity discharge • sump. The wetting • foundation soils and/or bedrock materials which causes heave may • reduced by carefully planned and maintained surface drainage. The following recommendations should be implemented during construction and maintained by the Homeowner after the residence is completed: M Standard Pacific of Colorado, Inc. Project Number 135271 January 31, 2014 Page 5 as much as practical during construction, 2 The ground surface surrounding the exterior of the foundation should M- maintained in such a manner as to provide for positive surface drainage aw from the foundation, At completion • construction, we recommend a minimu lu fall away from the foundation of 6 inches in the first 5 feet. This slope should continuous across the backfill zone. I 44, If lawn edging is used around the exterior of the foundation, it should cnstructed o p o in a manner trevent ponding of surface water in the vicinity f t backfill soils. I o 5 All drainage swales should be constructed and maintained a minimum of 5 feQ away from the foundation on side yards and 15 feet away from the foundation back and front yards. Drainage swales should maintain a slope of at least 2% o of the lot, Swales must not be blocked by fences, landscaping, paths or oth Homeowner installed items. 1 i 6. Roof downspouts and drains should discharge well beyond the limits of foundation backfill. Plastic membranes should not be used to cover the ground surface immediateliii surrounding the foundation. These membranes tend to trap moisture and preve normal evaporation from occurring, We recommend the use of a we suppressant geotextile fabric, • We believe the professional judgments expressed in this report are consistent with that degree of skill and care ordinarily exercised by practicing design professionals performing similar design services in the same locality, at the same time, at the same site and under the same or similar M Standard Pacific of Colorado, Inc. Project Number 135271 January 31, 2014 Page 6 If we can be of further service in discussing the contents of this letter or in analysis of the proposed structure from the soil and foundation viewpoint, please call our office. Sincerely, -C<L1U'JxKWn- MI I 11111�111 1111p 93ZMEM • a -1dent M99MIN M NOTES: 1. DRAIN MUST SLOPE TO A POSITIVE GRAVITY OUTLET AND /OR TO SUMP WHERE WATER CAN BE REMOVED BY PUMPING 2. SLOPE BOTTOM OF TRENCH AND PIPE AT A MINIMUM OF 1 }8" PER FOOT (Le. 10%) 1 3 OR 4 -INCH DIAMETER RIGID PERFORATED PVC PIPE (ASTM D2729 MINIMUM SCHEDULE 20), OR AN APPROVED SUBSTITUTE FOUNDATION 4. GRAVEL SPECIFICATION: 2" MINUS WASHED WALL ROC/GRAVEL, POORLY GRADED WITH NO MORE THAN 30% PASSING THE 3/8" SIEVE AND NO MORE THAN 10% PASSING THE f#4 SIEVE, OR A APPROVED BY THE GEOTECHNICAL ENGINEER BACKFILL NON -WOVEN GEOTEXTILE FILTER FABRIC (MIRAFI 140N OR EQUIVALENT) PLACED OVER ENTIRE WIDTH OF DRAIN GRAVEL. ( DRAIN GRAVEL - (SEE NOTE 4) GRAVEL SHALL FILL ENTIRE TRENCH AND EXTEND LATERALLY TO EDGE OF FOOTING AND UP AT LEAST 2" ABOVE BOTTOM OF FOOTING WITH A MINIMUM OF 3" OF GRAVEL COVER ABOVE PIPE AT HIGH POINT. /— SLIP JOINT CONCRETE SLAB .M._.�_.�. " �BACKFILL—'� s • a r� i . •• +r s +� r y • �r rr THE F OUNDATIO N, s s • A.G. Geote+chnical and ErrAronmentat Gonsudtants DR 1 FTC'.., 1 INT-SOG MTF JULY 2010 FOOTING FOUNDATION TYPICAL INTERIOR FIGURE 1 DRAIN DETAIL City of W3.6atR I d C ,,,�g COMMUNny DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033-8001 P: 303,235.2846 F: 301235,2857 March 20, 2014 OFFICIAL ADDRESS NOTIFICA Z2IR!EAjMNMP CODE CORRECTION NOTIFICATION is hereby given that the following address has been assigned to the property/properties as indicated below: PROPERTY OWNER(S): Standard PaciFic of Colorado Inc. A Delaware Ca ration OLD ADDRESS: None '90 abor Cr. Wheat Ri d e Co '0033 '0 NEW ADDRESS: 3 "0 't'ab � or Ct. 80033 Block 1_ Lo t25 3870 ab I or Ct. 80033 033 3 60 1, ab 8 or Ct Ile t Ri e C W 0�810033 80033 3 5 Ta b or 8 0 T or Cr. Ct W heat R i C e 081 Blac o 'oc t 2 8 Block 1 -Lor 6 3801 Taft Ct. Wheat Rtd e C{ 3 3830 T abor Ct. Tab block l _ I of 3819 `Taft Ct, Wheat I2id e CC) 3 Black 1 Lor 9 3829 Taff Ct. Wheat Rzd CC 3 Black t -Lot 10 3839 "Taft Ct. Wear Rid e CC? 33 Stock l _Lot 11 384 Tafr Ct. Wheat Rid e C) 33 Black 1 -Lor 12 38E9 Tafil Ct. Wheat laid >e C( 33 33 Block I Lot t4 3889 Taft Ct. Wheat Rid e CCU 33 'oc "o' '90 abor Cr. Wheat Ri d e Co '0033 '0 Block I - Lot 4 3 "0 't'ab � or Ct. W heat: e R id 80033 Block 1_ Lo t25 3870 ab I or Ct. Wheat Ri e 0 80033 C B l ack 1 Lot 26 3 60 1, ab 8 or Ct Ile t Ri e C W 0�810033 S to c k Lot .1 1 7 3 5 Ta b or 8 0 T or Cr. Ct W heat R i C e 081 Blac o 'oc t 2 8 384 Ta b 0 or Ct' t R ea 80 0 0033 d e �Q� : Mac k 2 I -ot 9 3830 T abor Ct. Tab i Co hea R �e 33 �( 8 � �ock I Lot 30 38 0 or Ct Wheat Co e R id 80�033 3 Black 2 - Ilot 3 383E `Taft Ct. Wheat. Rid e CCU 80033 Black 2 - Lat 4 3848 Taft Ct. Wheat Rid e fC} 3 3 33 WWWA-Wheatridgexo.us I 1] IM1 4 JIM I I I 101 (Block l,ot 1 2 3871 Tabor Q. Wheat Rid (Block 2 – Lot 13) 3861 Tabor Ct.,Wheat Ridge, co 8o033 Block 2 -• -Lot 14 3851 Taber Ct. Wheat Rid e CC) 80033 (Block 2 -.- Lot 15113841 Tabor Ct,,Wheat Ridg cO 80033 fRIA01- I – T tit I Al 'A R I I 'rnl nr Of 1X71-4 DA,.- f^t onlill SUIRDIVISION: Doud Overlook Subdivision aka Fireside at Youn field Subdivision LOT(S): KEY: SECTION: — JEFFERSON COUNTY RECEPTION #: 2013143668 9mmmusm NOTES: This is a courtesy notification, AUTHORIZED BY. DATE: JUL-11timu NOTE: Please notify all other parties concerned. ADDRESS MAP UPDATED BY: DATE: R69W 601 ALUM. PPE W/ 3 -1/4 GRASS CAR EO STAMP LS 13212' N RANK 8O% PONT 14109 N-708326.7466 E- 1025512566 T35, P.2' I I I I 1 I i I I I I I� i� 1 I, M la IY� IW I I LOT 11 3819 0710 38M P p TV s s O 11858 11842 11828 NEST 39TH PLACE 0 2 1871 11851 RP 11831 G 2 11811 • 0 0 o s 398 H.O.A. C 3881 LOT 7 LOT 12 3884 3871 LOT 6 LANDSCAPING 3872 LOT 13 3881 LOT 5 C 3550 LOT 14 I 3851 3821 LOT 4 3848 LOT 15 3841 LOT 3 3836 1 <\ 1 0 LOT 22 11810 TRACT 8 E. 1/4 CORO" SEC. 20 T35, R69W 6TH P.Y. S AIW. i'Pf W/ 3 !BASS CAP l STAIIREEI ,313=13- N RAHOE E01 05310 ADDRESS PLAT PONT 14209 11212' N 9 RA" 0.1 a•0 DOUD OVERLOOK SUBDIVISION FILING NO. 2 BEING A REPLAT OF A PORTION OF DOUD OVERLOOK SUBDIVISION, --� LOCATED IN THE WEST HALF OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 20 AND THE WEST HALF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 29, `s TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN, I CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO 48 LOTS, 5 TRACTS & PUBLIC R.O.W. — 14.872 ACRES I 1 r 1 LOT 23 3890 1 rI �1 I TRACT USE I A 1 HO.A LOT 16 3831 1 H.O.A. C t UTUTE3 LOT if D UTRITES DRAINAGE k EYEROENCY ACCESS LOT 2 E LANDSCAPING N.O.A. TRACT C 3889.5 LOT 14 C 3m I 3824 3821 LOT 24 3880 h LOT 25 3870 M I LOT 26 3880 LOT 27 3850 LOT 28 3840 LOT 29 3830 1 * I LOT 17 - - - - * I j I 1 3812 11831 O M LOT 8 LOT 1 _ LOT 30 MI 3819 O 11871 3820 1 C I y8T11 PU►_�� POINT a T LS ,ea7 _r LOT 7 w -' TW •1RACT 0 LOT 31 + Lr 11820 t — 'a UN v K I? 3610 BRASS CAP y1p 11880 c r�oR7risioo 1331:• N RANK NI2 I 11890 11880 1 N- 7056727126 E- 1025618715 I 3801 W N O 3800.5 1RACT SE 1/4 SEC. 20� CAP 1 0 of ��` `� 1M►Tf �— _—J DD05TM0 \ I I2' LIB I N I I 1 I I IR TRACT USE TABLE TRACT USE OWNER A LANDSCAPING HO.A 8 DETEMI110H POND k VTMUTES H.O.A. C t UTUTE3 H.O.A. D UTRITES DRAINAGE k EYEROENCY ACCESS H.O.A. E LANDSCAPING N.O.A. 1 N N.O.A. -HOME OWNERS ASSOCIATION 1� I I I IEOE10 1 Nlocx ,RrLR SICWaR COINER R4W. RMT -OF -MY "ammy Lm LOT LINE 0057N0 PLATS rz:71cm uw ROAD O911ER Lm I x I 1 -4 POINT Of OMSV ICDIENT BE CORRNf SEC 20 TM. RRf 6TH P.Y. AWL PPE W/ 3-1/4 BRASS CAP STATED. %S 13512' N RANK BOX PONT ism — — N-705701.5458 E.1052301675 I I— 'SCALE: 1" - 60' CPI Vry.AL tPAOM: _:..LI DEVELOPER ENGINEER \SURVEYOR rlr`■rsn.�6 *"DAIQDPACtfjcHomjs CA RROLL& LA NGE- MA N HARD •/•RV6,Nro anLelA1►a aoYRWPn V A .P. a •et1`..- ��ira: �WriWR.i...�ow1• LOT 16 i LOT 17 11874 ' 1182'0 LOT 16 { I 3901 I 11900 I I LOT 15 V 3899 1 1 I TRACT C 3889.5 LOT 14 1 I 3WO I f LOT 13 j 3879 LOT 12 i � � "� d 3889 I