Loading...
HomeMy WebLinkAbout3899 Taft Courti CITY46F WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Job Address:j�� Permit Number: 55.Q ❑ No one available for inspection: Time 0 o o epM Re -Inspection required: Yes No When corrections have been made, call for re -inspection at 303-2345933 Date: -2,,/ 1 Inspector: t DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office - (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: M I b Job Address: 5-3 q i T -A r I_ C T Permit Number: 2.01.7 o5'5"YC) ❑ No one available for ins ion: Time AM/P i Re -Inspection required Ye No When corr871 ions have been made, call for re -inspection at 303-234-5933 Date: '1// -7 Inspector: i ► i f DO NOT REMOVE THIS NOTICE A a City of Wheat Ridge a V' _1�9 Residential Roofing PERMIT - 201705540 PERMIT NO: 201705540 ISSUED: 08/05/2017 JOB ADDRESS: 3899 Taft CT EXPIRES: 08/05/2018 JOB DESCRIPTION: Residential Re -roof to install Owens Corning asphalt shingles - 36 sq *** CONTACTS *** OWNER (303)319-9001 CUNY LINDSEY SUB (303)981-1265 Jon Lowrie 100243 Monarch Construction & Roofing *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 14,000.00 FEES Total Valuation 0.00 Use Tax 294.00 Permit Fee 267.70 ** TOTAL ** 561.70 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. City of Wheat Ridge Residential Roofing PERMIT - 201705540 PERMIT NO: 201705540 ISSUED: 08/05/2017 JOB ADDRESS: 3899 Taft CT EXPIRES: 08/05/2018 JOB DESCRIPTION: Residential Re -roof to install Owens Corning asphalt shingles - 36 sq I, by in signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. 0 r e>- i ? Signature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and maybe subject to a fee equal to one-half of the original ermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable cede or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Dan Schultz 470170 ��� 0 From: no-reply@ci.wheatridge.co.us Sent: Monday, July 31, 2017 1:03 PM To: CommDev Permits Subject: Online Form Submittal: Residential Roofing Permit Application Categories: Dane Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email Address 3899 taft ct ron cuny 3033199001 Field not completed. tl o Do you have a signed Yes contract to reroof this property? It will need to be provided at the time of permit pick-up. Attached Copy of Field not completed. Contract CONTRACTOR INFORMATION Contractor Business monarch construction Name Contractor's License 100243 Number (for the City of�� Wheat Ridge) Contractor Phone 3039811265 Number Contractor Email Address permits@monarchroofs.com Retype Contractor Email permits@monarchroofs.com Address DESCRIPTION OF WORK Are you re-decking the No roof? Description of Roofing owens corning Material Select Type of Material: Asphalt If "Other" is selected Field not completed. above, describe here: How many squares of the 36 material selected above? Does any portion of the No property include a flat roof? If yes, how many squares Field not completed. on the flat roof? TOTAL SQUARES 36 (pitched + flat) of all 2 roofing material for this project Provide additional detail house here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract 14000 value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant brie lowrie Email not displaying correctly? View it in your browser. 3 Top 1% of roofing contractors qw. "rj CusWer Naft —94-0--4L *-- /- ^&!Kfx Aftm A4. ftpl* W7 monato w"WOO A Rooft Ulf" Wk Ilk-IfiIIN m I", b ---w Oro 101'e 440 0 WVX fAo*,g: WIWI Is T-vt 1AN041t, Alw'r, any 0 Of wo q. It'a T,P�, mm,if ftd !jY mm I rwfsru uftwh- y aAm 14' #.10 WA 0414 ripe D try for N5 410;wo work. t�eets of -Osa we ifier eed. ao W*ki"A .0"'vOl tw "W45 (vw r ait 304 B Twi "neall PrOvAtea migah�z ta MWO 'Aley"s', wig t C Rq e( to to H-q�-Ptdk- Wdl CO*W�e-PBled WO 11Q, 1,"4Swq mw OPO jaGks flash iNmns) and 4 waA u*dmW w fte0I,'4 sio tw � WwotsbWd per GW , 4wvtlas 40AW,; And -,WO" Pl atgrl &sil mw tno 23 Int I naz*wYA 0 Owl 44k,3 mw PS�yw wo,�mmlsh Qv �m Aarreal F�tdw wgwanty Per S4- Owmkm P7t,04 00,40m, 40, Q 4a if fstiM`rtf palsy deaf rrdii n foil) eppec i,* Com olf, 11 ziwvi'Aetl ar vn-'wi r;ll !q-. � 11i's cpry 4�,� or Am" fte* t(I ;x= 001-Aw Wdes, 0,;Ch MAY mWom"up, O'dw am,QAR 13i"at 4"S"tleAm I- VOPPQ C iOFAIW 6Am N* 4Y UiA o'4 Aor)�4 in h-vallov QWWY fol'*ft-uf, 0; * rb - -t -,-x - , , I'lorelisrA ill, ODSO t*W&V a MIT fWOS twjj3:-,I. Tw tg!�j =�Pe md r� Cm 0AW I'* tfwtwr�v *Omwy 44 mar1w, , wil wwow, #0 mat to, ule mslmwa vomd Wq& C4w" Wo be fesp"Obie to pay W any vnm4m, dedlsftla, or Oftow W* #Qft*Sd by 90 V"F,.W!w 1he the W-Minft"Com Ow cojvw�00 "WOO OY Qw iowslce PO4*. AproAlm* Dat" of IUNLO,to w Z sits* dates of 64,ViR aN �As. to OW -46 Om Ousuat JaWyt in twifwebwo r,,f materials, Pw4mt 40,100, imrot" APPWSI, afokipiy i�whor 44WA, v tsy,*Oy Ow -muses bo -a mosuawe Comm of moriarcilmorwo ma Omwo woei4 Of O'w to M.10,,f wil* A, 19, I -',R u "0 4'qy ;,Y V,* O4fi:lg wn t"jivuimq 10 P.nre. P- 4ar"e, of re -!0, �,f PaA CK sr., taswra,;ce- *Iu�**' A 4112-4105 '.he rp*�g Coft1cw- W,*e � mut, w pm'w U) pay .AO kt J,e Uw� z6 C:> pae- fzti w"Y ;,jA5 a ih 4as Ow tcmy E 0* a wmiad 1 -0 mbvonp too - k I Ta"u'l s��, mvrz-�!p, r, *. "��,*u4svve- m%** % 'P lawwlwy ,sift qm'u'-w 4m`aw"bjwwg Opp hOO-'9H'*'a-4 w1v LTr; W�FA cq-iv*ja 6 f,44'r,7 m-qwA 4="n::: NMAMY -0� C: h -&- I (WO) agteo, by Sigping Wfw to elf i4e u,'raf.4a br,,414 tam arld I Pok 4 4,m G�FS7 ant. 04; R u4m..., City of' Wheat'R le, C C Om) _jA OMMUNiTy DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 29" Ave. Wheat Ridge, CO 80033-8001 P: 301235,2855 F: 301237,8929 August 30"', 2016 Owner/Occupant 3899 Taft Ct. Wheat Ridge, CO 80033 RE: Previously permitted project plans available for retrieval — Permit 201500496 (New Single Family) Owner/Occupant, This letter is being sent to you because a project for which a permit was issued by the City of Wheat Ridge Building Division and plans and/or other documents were required was recently completed and approved. In accordance with the Building Division's document retention policy, the associated plans and/or other documents are scheduled for disposal. We are writing to offer you an opportunity to retrieve those approved plans and/or documents prior to their disposal by the Building Division. The plans and/or documents are available for retrieval for a period of 20 working days (4 weeks) from the date of this letter and must be retrieved in person at the Building Division offices. This letter must be presented at the time of retrieval of the plans and/or documents. Plans and/or documents available for retrieval CANNOT be mailed and plans and/or documents will NOT be available for retrieval after the expiration of the retrieval period, which is 60 days from the date of this letter,. You may retrieve plans and/or documents between the hours of 7:30 a.m. and 3.30 p.m., Monday through Friday, at the Building Division offices located at 7500 W. 29"' Avenue in Wheat Ridge, Melissa Mackey Senior Pertft Technician 7500 W. 29th Avenue Wheat Ridge, Colorado 80033 Office Phone: 303-235-2873 Fax: 303-237-8929 www,ci.wheatrida-- uc, City CA eat �'WhB d COMMUNITY DiNELOPMENT www.ci.wheatridge.coms "Where qualit, , design leads to lower costs. " November 4, 2015 Standard Pacific Homes -- Colorado Division 7800 East Dorado Place, Ste 220 Greenwood Village, CO 80111 Re: Fireside at Applewood Lot 15 Block 1 5050A — 3899 Taft Court Joistwith Hole outside of recommendatioms To whom it may concern: This letter is written to address a hole in a joist web that is outside of the manufacturer allowable hole locations. The hole is approximately 5" wide and removes the web down to the flange at approximately 5' from the joist edge. The joist in question is at the entry area and is approximately 15' in length. I have reviewed the design loads -Mth this hole and the joist still meets code requirements, No changes are necessary to this joist. Please don't hesitate to call or email me should I be able to provide any ftirther assistance. EM Xp F ELTE N GROUP, INC. Jacob E. Morgan, P.E. Director — Colorado Office 602-867-2500 19M City Wh6a-tPj,.d COMMUNITY DEVELOPMENT Building & Inspection Services Division Ave.,7600 W. 2e Wheat Ridge, CO 80033 Office: Inspection P180ftnInit r ,w Standard Pacific Homes of Colorado, Inc. V 23018468528 I l n 406 if different than property address) Address: 77800 East Dorado Place, Suite 220 a CO 80111 d *IF JOE 11IS *♦ Other66M64W: Same as abaird «. City License # 4ther City Licensed Sub: City License # Complete all information on BOTH sides of this farm at Fireside n Plan Review Works Rm 02,014 Vo Address: Doud Subdivision, Filing 2, Lot Applicable survey conditions: PND (survey at foundation) NRS (survey prior to CO, iftithin 2 feet of setback) DOUDI (landscaping) DOUD2 (setbacks) Lot Size: % Maximum Building Coverage (4(l%): —t—vu— sq. ft. Total Proposed Building Coverage: sq. ft. Setbacks: Front Interior Side Side on street/open space Interior Rear Perimeter Rear Required Provided 20ft— 1 )L -7-5- W Is the structure within 2 feet of minimum setbacks? (if yes, add surveying condition Architectural review, cansiderations (ge 0 LQED—ph Q Homes of lots siding to public r -o -w and/or Open space tracts shall utilize same minimum architectural treatments on side fa9ade facing r -O -w Or Open space as ftont facades. CJ Front setbacks shall vary a minimum of 2.5 ft. No three adjacent homes or homes directly across the street shall have the same front setback. U No two adjacent homes or homes across the street shall utilize the same architecturally detailed elevation. Q Architectural features such as cornices, eaves, belt courses, bay windows, sills, canopies, porches, decks patios, and balconies may extend or project into a setback a maximum of thirty inch , es. U The first floor of the front elevation shall have a minimum of 67% masonry: brick, brick vener, stucco, stones, stone veneer or synthetic stone, with a full return (minimum 4' high) wainscoting on the sides of the homes. City of SINGLE FAMILYIDUPLEX �q, �'Wh6at"]_ ge BL[ILDINGPERMI TAPPLICATIONREVIEW PUBLIC WORKS Date: Location: ATTENTION: BUILDING DIVISION I have reviewed the submitted application documents to construct a located at the above referenced address. Please note the comments checked below. 1. --V/— Drainage: a. Drainage Letter & Plan required: —Yes No b. Site drainage/grading plan have been reviewed and are: OK reler'o stipulations. 2. _44 Public Improvements requiredto & to be completed with project: a. street paving/patching: — Yes _j/ No _ Completed b, curb & gutter: — Yes -4/_ No — Completed c. sidewalk: — Yes No — Completed d. Other (specify): — Yes No — Completed For items not constructed, the amount of funds taken in lieu of construction: 3 Does all existing roadway/alley R.O.W, meet the standards of the City: Yes No If not, what is required? If R.O.W. is required, has the deed been received: Yes No (see Note below) NIOTE. All deeds must be reviewed and approved prior to issuance of the Certificate of Occupancy. 4 ,SPP ROVLD- The Public Works Department has reviewed the submitted material and hereby approves this Permit Application, subject to the stated requirements and/or attached stipulations, S7'gonature —Dale 5. NOT APPROVED: The Public Works Department has reviewed the submitted material and does not approve this Permit Application for the stated reason(s). Signature David F. Brossman, P.L.S. Date 6. Stipulations: 7. A Drainage Certification Letter accompanied by As -Built plans from the Engineer -of -Record shall be required prior to the issuance of the Certificate of Occupancy. 8. NOTE: ANY DAMAGE TO EXISTING PUBLIC IMPROVEMENTS AS A RESULT OF PROJECT CONSTRUCTION SHALL BE REPAIRED PER ROW coNmucnoN PERMIT PRIOR TO THE ISSUANCE CIT THE CERTIFICATE OF OCCUPANCY. Rev 0&'2013 Cit esf City of'Wheat Ridge Municipal Building 7500 W, 29"' Ave, Wbeat Ridge, CO0033-8001 P: 3i13ZS3 28Ca] F'; 301235Z57 PUBLIC WORKS DEVELOPMENT REVIEW Date: Location of Construction - Purpose of Construction- Single ns tion- ingle Family o tial Multi -Fa 'ly view ree ......... Efi 1l (Required of all projects for document processing 50:0 etfi-FI1 E2vie P'es ; Review of existing or minimal technical documents:,,,.," SII : OO Initial review' oftechnical civil engineering documents (.Fee includes reviews of the 1st and 2 `d submittals),.,,,,,,,,, ...:.....$600.00 Traffic Impact Studer Review Fee: (Fee includes reviews of the I" and 2"4 submittals :... 500.00 Trip Generation Study Review Fee -.....,l..".,,.,,",,,..",,,,,,,.,,,,,,,,,, 0 & M Manual Review & SMA Recording Fee--, ... a t1 3 Each Application will be reviewed by staff once and returned for changes, If after review oaf the second submittaI chan to the following Re ubrnittal Pees: ges have rant beery made to the civil documents err the Traffic Study as requested by staff further reviews of Application will be subject Resubmittal 3'd submittal ('r`2 initial review fee):,.:..;. $300.00 rya submittal (full initial review fee): ..... ......... Q.II All subsequent ubrnitials...,;..:. .....,.,° 00.0 (Full initial review feedTOTAL REVIEW FEES 5 (due at time of wilding Permit issuance): �...,.� PLEASE NOTE THAT IN ADD17IONTO THE ABOVE FEES, THERE WILL 13E ADDITIONAL LICENSING AND PE NG FEES REQLTIRED FOR CONSTRUCTION STRUC;TIO OFROVEMENTS RIGHT-OF-WAY, I P T F %vWrti,C6N h(`,a( d,g .(x),Ut Rev 12112 cify (1, tg tt3t ICofs Ks CAY of whit Ridge Municipal Building 700 W, 29th Ave. Wheat Ridge, Co 8003-01 R, 303.23.6i a 303.2351857 NOTIFICATION FOR PLIC I MpROVrMENTS RESTORATION DATED:-4/1� ADDRESS: Dear Contractor: In conjunction with the approval of the building address, this letter is t info you at all existing puit appic mcatio feats above referenced frontage of said address shall e restored, if d aged from related encs located c to an the acceptable condition, as determined by City of Wheat Ridge Public works Department, priorto the issuance of a Certificate Of Occupancy. Prior to any construction commencing, inspection to determine the existing condition(s) otdae representative will conduct onsite p c improvements at this address If you have any questions, please contact me at 303.235.2864. Sincerely, r David F. Brossman, p. .S. Development nt eview Engineer CC File Rev 2M Projecttt Contractor.- Standard Pacific .C,(?Ior4d6, Inc. SW Mechanical Contractor Wheat Ridge Liccns Sx ►at ut n ",A:uthor zed Agen Date *This appReat on must be signed bych sub-coutmetor confinning the same. • am Subject: Soil and Foundation Study Proposed Residential Structure Lot 15, Block 1 Doud Overlook Wheat Ridge, Colorado Project Number 135276 W= �WX4a*g'r43MILqz ugxolffluo 303-759-8100 Fax 303-756-2920 wwwlagwassenaar.com . 0 0 rtMM#11#K#I 0' to 3' Fill, sand, medium dense, silty, slightly clayey, slightly gravelly, moist, mottled brown lili,iiiiiiiiill!l E III SPIRIT!• TIME 11111 11113!i I REVIESEMMIZE1 Depth to water: 13 feet at the time of drilling Caved at 13 feet 2 days after drillint, Samples obtained during drilling were returned to the laboratory. They were visually classified and subsurface materials encountered. The samples tested were non -plastic and, therefore, non - expansive. Based upon visual observation of the subsurface conditions encountered and laboratory testing for this and/or adjacent lots, it is our opinion that the subsurface materials generally exhibit no to low potential for expansion. Refer to the Colorado Geological Survey Special Publication 43 for a description of expansive soils and their impact on structure performance. Standard Pacific of Colorado, Inc. Project Number 135276 January 31, 2014 Page 2 bearing on suitable materials as anticipated for design purposes. The foundation walls backfilled with on-site materials should be designed for a lateral earth pressure based upon an equivalent fluid density of 65 pounds per cubic foot (pcf) for the "at rest" condition or 50 pcf for the "active" condition, The "active" condition should only be used w ere wa movements of at least 0.5% of the wall height are allowed. These values have been provide without considerations for sloping backfill, surcharge loading or hydrostatic pressures. Construction of a drain system and proper surface drainage as discussed later in this report may lower the potential of developing hydrostatic pressure in the backfill materials. Minor cracking of concrete foundation walls should be expected. For sites with a risk assessment of high or very high, we recommend an interior floor system engineered for expansive soils be constructed. An alternative to the use of an engineered floor system, such as soil modification to reduce the risk assessment, may also be considered. In addition, an engineered interior floor system is recommended for all finished areas or any other areas where floor movements cannot be tolerated. Standard Pacific of Colorado, Inc. Project Number 135276 January 31, 2014 Page 3 M—MOM11-0- _4 ME IM 0-0 a If the Builder and/or Owner desires to construct a concrete slab -on -grade and accepts the risk of slab movement, stabs supported by the expansive subsurface materials should be constructed using the following criteria: a joint which allows free vertical movement of the slab. 2. Slab bearing partitions should be constructed with a minimum 2 -inch void spac' Stairways bearing upon the slab should be constructed in such a way as to alto 1 at least 2 inches of slab heave. In the event of slab heave, the movement shou 1 not be transmitted directly through t« to the remainder of t #® 4Where a forced -air heating system is used and the furnace is located on the slab, we recommend provision for a collapsible connection between the furnace and the duct work to allow for at least 3 inches of slab heave. Utility connections should also be provided with flexible connections capable of accommodating the same magnitude of movement as specified above. i k assessments. During construction, the crawl space area should be checked for standing water or very moist conditions, construction debris, and other deleterious materials. If these conditions exist, the area should be evaluated and mitigated, as necessary. Standard Pacific of Colorado, Inc. Project Number 135276 January 31, 2014 Page 4 Crawl space areas should be constructed with consideration given to proper ventilation and moisture management. Provisions such as the installation of a vapor retarder should be utilized to reduce the amount of moisture (humidity) in the crawl space air. The Client and any future Owner should be aware that crawl space areas are subject to various air quality issues. A consultant specializing in ventilation and air quality control should be contacted to provide any additional recommendations. Such recommendations are beyond the geotechnical scope of this study. The environmental division of A. G. Wassenaar, Inc. is capable of providing such services. Refer to "Homeowner's Guide To Moisture Management" by Tri -County Health Department (Brochure Number S-323) for additional information. Simi e a acne r in I igure 5) ano snoULTZ-7 discharge or sump. If a sump pit is installed, it should be monitored for water accumulation and proper operation, The water level in the sump • should not be allowed to rise above the foundation drain inlet pipe(s). If water rises above the inlet pipe(s), a pump should be installed (if not originally equipped) or maintenance should be performed on the existing pump. • i ne wettin ounaltion solis ano carefully planned and maintained surface drainage. The following recommendations should be implemented during construction and maintained by the Homeowner after the residence is completed: 1 Excessive wetting or drying of the open foundation excavation should be avoid as much as practical during construction. I 1 The ground surface surrounding the exterior of the foundation should be maintained in such a manner as to provide for positive surface drainage away from the foundation. At completion of construction, we recommend a minimum fall away from the foundation of 6 inches in the first 5 feet. This slope should be continuous across the backfill zone. �*01#1 girt 1.12 1 P1 ME I a 0 f f at- ---I- Standard Pacific of Colorado, Inc. Project Number 135276 January 31, 2014 Page 5 If lawn edging is used around the exterior of the foundation, it should constructed in a manner to prevent ponding of surface water in the vicinity of t backfill soils. I 5. All drainage swales should be constructed and maintained a minimum of 5 feQ 7 away from the foundation on side yards and 15 feet away from the foundation back and front yards, Drainage swales should maintain a slope of at least 2% of the lot. Swales must not be blocked by fences, landscaping, paths or oth Homeowner installed items. 11 6Roof downspouts and drains should discharge well beyond the limits of •. 'I T Watering adjacent to the foundation should be reduced as much as practic-," Landscaping which requires excessive watering should not be located within feet of foundation walls. Main sprinkler lines, zone control boxes and drai should be located outside the limits of the foundation backfill, Sprinkler hea should be positioned such that the spray does not fall within 5 feet of foundati walls. B. Plastic membranes should not be used to cover the ground surface immediate surrounding the foundation. These membranes tend to trap • and preve normal evaporation from occurring, We recommend the use of a we suppressant geotextile fabric. This report was prepared for the exclusive use of our Client for the sole purpose of providing geotechnical design criteria for the subject structure based upon the existing site conditions as encountered. The conclusions and recommendations contained in this report shall not be considered valid for use by Others without written authorization from A. G. Wassenaar, Inc. In addition, the state of practice in geotechnical engineering is constantly evolving. Therefore, findings presented in this report should be reviewed and revised, if necessary, prior to actua construction, Standard Pacific of Colorado, Inc. Project Number 135276 January 31, 2014 Page 6 structure from the soil and foundation viewpoint, please call our office. Sincerely, g!P' A, G, WASSENAAR, IN Mi o6el R. Bonner, P.E. Senior Engineer Reviewed by: Dona L. TF.ay ay Q " 16PI MRC/DLT/lia Attachment- Figure 1 BACKFILL m NOTES:, 1. DRAIN MUST SLOPE TO A POSITIVE GRAVITY OUTLET AND/OR TO SUMP WHERE WATER CAN BE REMOVED BY PUMPING 2, SLOPE BOTTOM OF TRENCH AND PIPE AT A MINIMUM OF 1/8" PER FOOT (I.e. 1 %) 1 3 OR 44NCH DIAMETER RIGID PERFORATED PVC PIPE (ASTM D2729 MINIMUM SCHEDULE 20), OR AN APPROVED SUBSTITUTE FOUNDATION 4. GRAVEL SPECIFICATION: 2' MINUS WASHED WALL ROCKJGRAVEL, POORLY GRADED WITH NO MORE THAN 30% PASSING THE 3/8" SIEVE AND NO MORE THAN 10% PASSING THE #4 SIEVE, OR AS APPROVED BY THE GEOTECHNICAL ENGINEER rSLIP JOINT i WIDTH OF DRAIN GRAVEL. DRAIN GRAVEL - (SEE NOTE 4) GRAVEL JWA6.6, jj6j j TPEWC�l g 4 Qjr it M_ a 61ALLY 14mi" 4=101M 'IA PIPE AT HIGH POINT. BACKFILL---'-� SLOPE TO DRAIN PIPE - (SEE NOTES #2 & 3) DRAIN MINIMUM AT LOCATION OF HIGH POINT, ESTABLISH BOTTOM OF DRAIN DO NOT EXCAVATE PIPE AT LEAST 4" BELOW WITHIN 1:1 LINE BOTTOM OF FOOTING OR PAD EXTENDING DOWN AND AWAY FROM CREATE MINIMUM 4' PATHWAYS THROUGH EDGE OFFOOTING OR UNDER THE FOOTING WITH SOLID PCV PIPE (NOTE 3) OR FOUNDATION VOID MATERIAL, THE PATHWAYS SHOULD BE BENEATH EACH WINDOW WELL AND AT APPROXIMATE 15 FOOT INTERVALS AROUND THE FOUNDATION, DR \ FTG 1 INT-SOG MTF JULY 2010 NOTE: NOT TO SCALE A.G. Wassenaar Gomachocal and Enwironmental Cons ants FOOTING FOUNDATION TYPICAL INTERIOR DRAIN DETAIL Furnace = Carrier Model 59SC2BO60S2 --16 (6 00 BTU) APPROVED Air Conditioner = Carrier Model CA13NA030****(A,6) (2.5 Tort) StAb e t to Field InsperAions Evaporator Coil = Carrier Model CIS PV*3617AL*+TDR (3 Torr) Wheat Ridge Bur6ng Dept, Duct Summary Notes, Static pressure avagoble values for return duds are atthe entrance of the duct. For supply, they are at the exit. The cumulative static pressure lossvalue for a return trunk is ith respect to the entry point of the return runout upstream with the highest static pressure available. Total and cumulative static pressure loss values for the supply main trunk include any device pressurelosses entered, and the cumulative may also incline the total static pressure loss of the return side. Number of active tr trtks: 1 Number of active runouts: t Total runout outlet airflow 1,196 Main trunk airflow: 1,026 Largest trunk diameter. 16.6 SMT -iii Largest runout diameter, r R-100 Smallest trunk diameter: 12.9 6T-670 mallest runout diameter,14 t2mtiiti System duct surface area (No Scenario): 364.6 System duct surface area (Scenario 1): 374.6 Attic (Linked to duct load) Total systema duct surface area: 739.3 Furnace Blower r data AM I WN T RETURN-AIR stm CO:NNF-C"nON 040-10 SIMSOTTOM 040-12 SIOFAOTTOM -1—:z—MI -1 i � + • �:. .� a�. f.., i :�s ^af �t r � ee � e�� � ... �� .r �x a �- >t � ,�:- °� w., « .x c:' a � s w a M e M: Detailed Cooling Capacities LQ9,4L 2847 27,02 2,,06 27,OD VAO —7-- Z29 -- — MOO —' -- —25" — 2" --T _ _ --— 25,-04 -5—.04 2,05 —9,01 7,01 :F29 F OO ig89 53 — --REM— $2.83 1&14 2.13 3140 M65 2.35 29,91 17,14 219 A3 -3O 2.1s 29,03 MOO 2.34 27,62 2226 2,58 1125 22,57 2,12 27,32 22,06 2,34 2545 21,40 2,58 28,79 2&79 212 2711 27,71 Z34 Sensible Heat Gain =19714 BTUs AC Delivers ((TOTAL-SENS)/2)+SENS ((25390-19070)/2)+19070= 22230 BTUS 19727/22230 =.89 or 11% over Equipment: SYSYTEM 2 (2 FLOOR) Furnace = Carrier Model 59SC2BO60SI7--16(60000 BTU) Air Conditioner = Carrier Model CA13NA024****(AB) (2 Ton) Evaporator Coil = Carrier Model CNPH*3017AL*+TDR (2.5 Ton) Duct Summary Notes, Static pressure wallable values for return ducts are at the entrance of the duct. For supply, they are at the Exit, The cumulative static pressure loss value for a return trunk Is with respect to the entry poll nt of the return runout upstream with the highest static pressure available, Total and Cumulative Static pressure loss values for ther supply main trunk include any device pressure losses entered, and the cumulative may also Include the total static pressure toss of the return side. Number OF aCtlVe IrUrk$: V Number of active rrouts: 16 Total runOUtoutlet alrflaw: %6 Main Mink airflow, q14 9 Larplest trunk diameter 16 SMT -400 Largest runcHA diameter 8 SR -310 Smallest trunk diameter: 16 SMT -400 System duct surface area (Scenario 1): 5023 Attic (Linked to duct load) Total system duct surface area, 5023 t .. # • R it R'. # M Y # # 4 » +as+ ,1 w ■�������i����W����AN����ui1���4lwlR ,`�'d1eG'tl # b e a .•s • • ' ,�+ .y lA :i:, 'f 8 � !E c, ,?�.p A 8i # i... fMb to 6. k 9 " 3A i t Y i t g. . R :: .: M 8 W4 F x [ ^�.,„ w � "* i � �� Y 4V" ! � # # 8 q t i t'. .. r « ,. �. .. gg pp M Y � d k ...... 1 _: «! Sensible Gain from !Manual 9 =18478 BTUs C Delivers ({TOL- ENS)/2)+ EN = ((21600-16080)/2)+16080= 18840 BTUs 18478/18840=.98 or 2°I Over Mdt A JY� , w xi Sensible Gain from !Manual 9 =18478 BTUs C Delivers ({TOL- ENS)/2)+ EN = ((21600-16080)/2)+16080= 18840 BTUs 18478/18840=.98 or 2°I Over ------ - --- ____ - — ----- --- -------- __ ---------- - Project Repoil Project Title: Standard Pacific Fireside At Applewood 5050 Designed By: Chad Morris Project Date: Friday, February 14, 2014 Client Name: Standard Pacific Client Address: 7800 East Dorado Place Suite 220 Client City: Greenwood Village, CO. 80111 Client Phone: (303)846-8553 Company Name: Smith And Willis Heating And Air LLC Company Representative: Andy O'Leary Company Address: 6121 Clermont St. Company City: Commerce City, CO. 80022 Company Phone: (303)688-4487 ext 102 Company E -Mail Address: aolearypsmithandwillis.com Reference City: Wheatridge, Colorado Building Orientation: Front door faces Northeast Daily Temperature Range-, High Latitude: 39 Degrees Elevation- 5476 ft, Attitude Factor: 0.817 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hurn P" Bulbif — PLference Winter: 1 0.2 80% 30% 70 34.18 Summer: 91 59 15% 50% 75 -39 Total Building Supply CFM: 1,975 CFM Per Square ft.: 0.372 Square ft. of Room Area: 5,310 Square ft, Per Ton: 1,905 Volume (W) of Cond. Space: 51,690 Total Heating Required Including Ventilation Air: 77,327 Btuh 77,327 MBH Total Sensible Gain: 38,191 Btuh 100 % Total Latent Gain: -4,739 Btuh 0 % Total Cooling Required Including Ventilation Air: 38,191 Btuh 3.18 Tons (Based On Sensible + Latent) Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per RCCA Manual J 8th Edition, Version 2, and ACOA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. Y:\ .,.\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM Y-.\.,,\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014, 11:51 AM .3sual D DOct Svstem • ---Duct Name: SR -100, Supplies: Great Room, Fittings: 4MG, -1, Effective Length: 92.2 Runout 0.0003 7 344 0.005 Up: T-580 55 5.4 0.030 0.032 Rnd 17.3 7,7 74.9 0.027 Presize 92 31.6 0.293 0.502 ---Duct Name: SR -110, Supplies: Creat Room, Fittings: 2-1,4-H, Effective Length: 55.4 Runout 0.0003 7 344 0.003 Up: ST -670 55 5.4 0.030 0.013 Reid 10.0 7.7 45.4 O.016 Presize 92 13.3 0.308 0.492 --- Duct Name: SR -120, Supplies: Opt Office/HobbytMudRm, Fittings: 4-H, 2«1, 8-A2, 8-A2, Effective Length: 04.5 Runout 0.0003 7 415 0;009 Up: ST -690 55 5.4 0,041 0.026 Rnd 20.8 7.7 633 0.035 Presize 111 38 0.293 0.507 ---Duct Mame: SR -130, Supplies: Kitchen/Nook, Fittings; 2-1, -G, Effective Length: 70. Runout 0.0003 7 262 0.003 Up. ST -700 55 5.4 0,018 0.010 Rnd 16.6 7.7 53.7 0,013 Presize 70 30.4 0.315 0.485 -w.Duct Marne: SR -140, Supplies: Kitchen/Nook, Fittings: 4-G, 2-1, Effective Length: 76.9 Runout 0.0003 7 262 0,004 Up. ST -620 55 5,4 0,018 0.010 Rnd 23.3 7.7 53.7 0.014 Presize 70 42.6 0.314 0.486 ---Duct Name: SR -150, Supplies: Dining, Fittings. 4-H, 2-1, Effective Length: 48.7 Runout 0.0003 7 288 0.001 Up: ST -670 55 5.4 0.022 0,009 Rnd 5.2 7,7 4:3.6 0.011 Presize 77 9.5 0.314 0.486 ---Duct Dame: SR -160, Supplies: Bath 3, Fittings: 4-H, 2«1, Effective Length: 38.8 Runout 0.0003 3 367 0.019 Up: T-590 128 2.4 0.088 0.015 Rnd 21.4 3,3 17.4 0.034 Presize 18, 16.8 0,291 0.509 -.-Duct Name: SR -170, Supplies: Bedroom 4, Fittings: 4-G, -1, Effective Length: 81.7 Runout 0.0003 7 262 0.006 Up, T-630 55 5.4 0,018 0.011 Rnd 34.3 73 57.4 0.017 Presize 70 62.9 0.309 0,491 ---Duct Name: SR -180, Supplies: Entry, Fittings: 4-G, 2-1, Effective Length: 91.8 Runout 0.0003 7 266 0.003 Up. T-610 128 5.4 0.017 0.012 Rnd 19.8 77 71.9 0,016 Presize 71 36.3 0.311 0.489 Y:l ...AStandard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 A ---Duct Name: SR -340, Supplies: Great Room, Fittings: 4-G, 2-1, Effective Length: 86.2 Runout 0,0003 7 344 0.005 Up, ST -610 55 5.4 0.030 0.020 1 Find 172 7,7 WO 0.026 Presize 92 31.5 0.301 0,499 --- Duct Name: SR -350, Supplies: Bedroom 4, Fittings: 4-G, 2-1, Effective Length: $7.4 Runout 0.0003 7 262 0.005 Up: ST -680 55 5.4 0.018 0.011 Find 263 73 61.1 0.016 fi Presize 70 48.1 0,309 0.491 __-Duct Name: SR -360, Supplies- Kitchen/Nook, Fittings: 4-H, 2-1, Effective Length: 53.0 Runout 0.0003 7 262 0.001 Up- ST -520 55 5.4 0.018 0.008 Find 6.8 7.7 46.3 0.010 11 Presize 70 12,4 0.319 0.481 ---Duct Name: ST -670, Feeds Into: Rec Room, Effective Length: 0.7 Trunk 0.0003 12.9 174 0,000 Up: ST -680 55 14 0.005 0.000 Rect 0.7 10 0.0 0.000 Presize 169 2.7 0.325 0.475 ---Cruet Name: ST -620, Feeds Into: Meeh Room, Effective Length: 0.8 Trunk 0.0003 16.9 408 0.000 Up: ST -520 55 25 0,017 0,000 Rect 0.8 10 0,0 0.000 Presize 709 4.4 0.328 0A72 ... Duct Name: ST -610, Feeds Into: Rec Room, Effective Length: 5.9 Trunk 0.0003 15,2 460 0.001 1 Up: ST -620 55 20 0.022 0.000 Rect 5.9 10 0r0 0.001 Presize 639 29.6 0.327 0.473 1 ---Duct Name: ST -600, Feeds Into: Rec Room, Effective Length: 6.3 Trunk 0.0003 15.2 354 0.001 Up: ST -610 55 20 0.014 uoo Rect 63 10 0.0 0.001 Presize 491 31.2 0.326 0,474 ---Duct Name: ST -590, Feeds Into: Rec Room, Effective Length: 2.4 Trunk 0.0003 15,2 300 0.000 Up: ST -630 55 20 0,010 0.000 Rect 2.4 10 0.0 0:000 Presize 417 12.1 0,326 0,474 1 ---Duct Name: ST -580, Feeds Into: Rec Room, Effective Length: 0.9 Trunk 0.0003 12,9 419 0.000 Up: ST -590 55 14 0.022 0.000 Rect 0.9 10 0.0 OZO Presize 407 3,7 0.325 0.475 Y -\.,.\Standard Pacific Plan 5050,rhv Tuesday, February 18, 2014,11:51 AM ---Duct Name: ST -540, Feeds Into: BSMT Rath, Effective Length: 2.0 Trunk 0.0003 12.9 132 0,000 Up: ST -700 128 14 0.003 0.000 Rect 2.0 10 0.0 0:000 Presize 128 8 0.328 0,472 ---Duct Name: SST -100, Feeds Into: Mcch Room, Fittings: 1-F',1-02, Effective Length: 127,1 Trunk 0.0003 18.0 402 0.000 Up: Fan 55 25 0.020 0.025 Rect 0.4 12 125.7 0.404 Presize 1,025 2.2 0.329 0.471 --Duct Name: SR -200, Supplies: BSIVIT Bedroom 6, Fittings: 4 -AD, 2-1, Effective -Length: 67.2 Runout 0.0003 7 217 0,002 Up. ST -530 55 5.4 0:013 0.007 Rnd 15.9 7.7 51.3 0.009 Presize 58 29.2 0.319 0.481 ---Duct Larne: SR -220, Supplies: BSMT Rath, Fittings: 4 -AD, 2-1, Effective Length: 27.7 Runout 0.0003 4 218 0.000 Up. ST -550 128 3.1 0.024 0.006 Rnd 1.8 4.4 25.9 0.007 Presize 19 1,9 0.321 0.479 ---Duct Name: SR -190, Supplies: Rec Room, Fittings: 4 -AD, 2-1, Effective Length: 67.4 Runout 0.0003 7 228 0,001 Up: ST -660 128 5.4 0.013 0.008 Rnd 6.0 7.7 61.4 0,009 Presize 61 11 0,316 0.484 ---Duct Name: SR -370, Supplies: Unfinshed Storage, Fittings: 4 -AD, 2 -1,8 -A2,8 -A2, Effective Length: 75.5 Runout 0.0003 6 234 0.004 Up. T-690 128 4.7 0,017 0,009 Rnd 21.5 6.6 54.0 0.013 Presize 46 33.8 0.315 0:485 ---Duct Name: SR -420, Supplies: Unfinished Storage A, Fittings: 4 -AD, 2.1, Effective Length: 87.5 Runout 0.0003 7 180 0.003 Up: ST -600 128 5.4 0.009 0«005 Rnd 33.3 7.7 54.3 0;007 Presize 48 60.9 0.319 0.481 ---Duct dame: SR -430, Supplies: Rec Room, Fittings: 4 -AL1; 2-1, Effective Length: 72.5 Runout 0.0003 7 228 0.001 Up: ST -660 128 5.4 0,013 0.008 Rnd 11.2 7.7 61.4 0,009 Presize 61 20.5 0.316 0.484 ---Duct Name: ST -520, Feeds Into: Mech Room, Effective Length: 2.7 Trunk 0.0003: 16.9 449 0.001 Up: SMT -100 55 25 0.020 0.000 Rect 2,7 10 0.0 0.001 Presize 779 15,6 0.328 0,472 Y:\ ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014, 11:51 AM ---Duct Name: ST -530, Feeds Into: Mech Room, Effective Length: 8.3 Trunk 0.0003 12,9 Up: SMT -100 55 14 Rect 83 10 Presize 246 333 ---Duct Name: ST -550, Feeds Into: BSMT Bath, Effective Length: 3.0 Trunk 0.0003 12.9 Up: ST -530 55 14 Rect 3.0 10 Presize 188 12 --- Duct Name: ST -630, Feeds Into: Rec Room, Effective Length: 2.3 Trunk 0,0003 15.2 Up: ST -600 55 20 Rect 2.3 10 Presize 487 11.2 --Duct Name: ST -660, Feeds Into: Dec Room, Effective Length: 2.1 Trunk 0,0003 12.9 Up: ST -580 55 14 Rect 2.1 10 Presize 315 8.3 253 0.001 0.009 0.000 0,0 0.001 0.328 0.472 193 0000 4.006 0 000 0.0 0,000 0.328 0.472 351 0.000 0.014 0:000 0,0 0.000 0.326 0.474 324 0.000 0.014 0.000 0,0 0.000 0.325 0.475 ---D ct Name: ST -680, Feeds Into: Rec Room, Effective Length: 0.9 Trunk 0.0003 12.9 246 0.000 Up: ST -660 55 14 0.009 0.000 Rect 0.9 10 0,0 0.000 Presize 239 3.7 0.325 0.475 ..Duct Name: ST -690, Feeds Into: BSMT Bath, Effective Length: 3.6 Trunk 0.0003 12,9 132 0.000 Up: ST -540 128 14 0.003 0.000 Rect 3.6 10 0.0 0.000 Presize 128 14,3 0.328 0.472 ...Duct Name: ST -700, Feeds Into: BSMT Bath, Effective Length, 2.8 Trunk 0.0003 12.9 190 0.000 Up: ST -550 55 14 0.005 0.000 Rect Z8 10 0,0 0.000 Presize 185 113 0,328 0.472 Report Units: Pressure: in.wg, Duct lengths: feet, Duct sizes: inch, Airflow- CFM, Velocity: ft./min, Temperature: F Y.\ -AStandard Pacific Plan 5050.rhv Tuesday, February 18, 2014, 11:51 AM Largest trunk diameter: 18.6 s SMS` -100 Largest runout diameter: 7 SP -100 Smallest trunk diameter: 12.9 ST -670 Smallest runout diameter: 3 SR -1{} Supply fan external static pressure: 0.800 Supply fan device pressure losses: 0.37 Supply fan static pressure available: 0.421 Runout maximum cumulative static pressure loss. 0.503 Sid -160 Return loss added to supply: 0.067 Total effective length of return ( ft.): 258.5 Main Floor Total effective length of supply ( ft.): 186A SR -160 Overall total effective length ( ft.): 442.6 Main Floor to SR -1 Design overall friction rate per 100 ft.: 6,095 (Available SP x 100 /TEL) i System duct surface area (leo Scenario): 364.6 System duct surface area (Scenario 1): 374.8 Attic (Linked to duct load) Total system duct surface area: 730.3 i i 1 i 1 I I l i s i i f i E a s Y:\ ...\Standard Pacific Plan 5050rrhv Tuesday, February 18, 2014, 11:51 A ---Duct Name: SMT -400, Feeds Into: Master Bath, Fitting: I -C, Effective Length: 44.4 Trunk 0.0003 16 680 0.000 Up: Fan 55 12.4 0.036 0.016 Rnd 0.3 17.5 44.1 0.324 1 Presize 949 1.4 0.419 01.331 ! ---Duct Name: SR -240, Supplies: Bedroom 3, Fittings: 4 -AD, 2-1, Effective Length: 47.2 ; Runout 0,011 6 250 0.008 1 Up: ST -760 55 4.7 01.034 0.008 Rnd 24,5 6.6 22.7 0.016 Presize 49 38.5 0.4012 0.398 --- Duct Name: SR -250, Supplies: Bedroom 2, Fittings: 4 -AD, 2-1, Effective Length: 47.0 Runout 0.01 7 288 0.007 Up: ST -780 55 5.4 0.036 0»010 Rnd 18.7 7.7 28.3 0.017 Presize 77 34.3 0.400 0.400. 1 ---Duct Name: SR -260, Supplies: Bath 2 Fittings: 4 -AD, 2-1, Effective Length: 30.4 Runout 0.01 4 241 0.008 Up: ST -780 128 3.1 0.048 0.007 Rnd 15.9 4.4 14.5 0.015 Presize 21 16.6 0.402 0.398 i ---Duct Mame: SR -280, Supplies: Laundry, Fittings: 4-A, 2-I, Effective Length: 26.0 Runout 0.01 5 367 0.007 Up. ST -760 55 19 0.093 0.017 Rnd 8.1 5.5 17.9 0.024 Presize 50 10.5 0393 0.407 ---Duct dame: SR -290, Supplies: Master Bedroom, Fittings: 4 -AD, 2.1, Effective Length: 58.4 Runout 0.01 7 322 0„009 Up. ST -730 55 5.4 0.045 0.017 Find 19.8 7.7 38.6 0.026 Presize 86 36,2 0.392 0.408 ---duct Name: Rif -300, Supplies: Master Bedroom, Fittings: 4 -AD, 2-1, Effective Length: 57.3 Runout 0.01 7 322 0:008 Up: T-710 55 5.4 0,045 0.017 Find 18,6 7.7 38.6 0.0126 Presize 86 34.1 0.393 0.407 ---Duct Name: R-310, Supplies: Master Rath, Fittings: 4 -AD; 2-I, Effective Length:, 56,7 Runout 0.01 8 315 0.004 Up: ST -720 55 6.2 0.036 0.017 Find 10.4 8.7 46.3 0.020 Presize 110 ' 21.7 0.398 0.402 I ---Duct Name: SR -320, Supplies: Her WIC, Fittings: 4 -AD, 2-1, Effective Length: 241,5 Runout 0.01 4 309 0;008 !: Up: SMT -400 128 3.1 0.080 0.012 Rnd 9.7 4.4 14.7 0.020 Presize 27 10.2 0.399 0.401 Y:\ ..y\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM ---Duct Name: SR -330, Supplies: Open To Below/Upper Hall, Fittings: 4 -AD, 2-I, Effective Length: 48.0 Runout 0.01 8 304 0:001 Up: ST -720 55 6.2 0.033 0.015 Rnd 1.8 8.7 46.3 0,016 Presize 106 3.7 0402 0.398 -a-Duct Name: SR -380, Supplies: Bedroom 2, Fittings: 2-1, -AD, Effective Length. 48.8 Runout 0.01 7 288 0.007 Up ST -780 55 5:4 0.036 0.010 Rnd 20.5 7.7 28.3 0,018 Presize 77 37.6 0.400 0.400 -a-Duct Deme:. SR -390, Supplies: Bedroom 3, Effective Length: 24.3 Runout 0.01 6 250 0.008 Up: ST -760 55 4.7 0.034 0.000 Rnd 24.3 6.6 0.0 0.008 Presize 49 38.2 0.409 0.391 ---Duct Name: SR -400, Supplies: Bonus FlmiOpt Dedrm 5/Opt MSTR Retreat, Effective Length: 21.5 Runout 0.01 7 228 0x 005 Ip: T-740 55 5,4 0.023 0.O00 Rnd 21,5 7.7 0.0 0.008 Presize 61 39.4 0.413 0.387 ---Duct Name; R-410, Supplies: Master Bedroom, Effective Length: 22.5 Runout 0.01 7 322 0.010 Up: ST -720 55 5.4 0.045 0.000 Find 22.5 7.7 0.0 0.010 Presize 86 41.3 0.408 0.392 --- Duct Name: T-'710, Feeds Into: Open To Below/Upper Hall, Effective Length. 0.6 Trunk 0.0003 16 668 0.000 Up: SMT -400 55 12.4 0.035 0,000 Rnd 0.6 17.5 0.0 0.000 Presize 932 2.4 0.419 0.381 ---Duct Name: aT-720, Feeds Into: Open To Below/Upper Hall, Effective Length: 0.8 Trunk 0.0003 16 595 0.000 Up: ST -710 55 12.4 0,028 0.000 Rnd 0.8 17.5 0.0 0.000 Presize 830 3.1 0.419 0.881 ---Duct Name. RT -730, Feeds Into: Open To Below /Upper Hall, Effective Length. 0.9 Trunk 0.0003 16 378 0.000 Up: T-720 55 12.4 0.013 0.000 Rnd 0.9 17.5 0.0 0.000 Presize 528 3.8 0.418 0.382 ---Duct Name: R-440, Supplies: WC, Effective Length: 12.8 Runout 0.01 4 183 0,004 Up: T-710 55 3.1 0.033 0.000 Rnd 12.8 4.4 0.0 0.004 Presize 16 13.4 0.415 0.385 Y:0 ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014;11;51 A ---Duct Name: ST -740, Feeds Into: Open To Below/Upper Hall, Effective Length: 4.5 Trunk 0,0003 16 317 omo Up: ST -730 55 12.4 0.009 0,000 Rnd 4,5 17.5 0.0 0,000 Presize 442 18.8 0A18 0.382 ---Duct Name: SR -450, Supplies: Bonus Rm/Opt Bedrm 5/Opt MSTR Retreat, Effective Length: 22.0 Runout 0.01 7 228 0.005 Up: ST -770 55 5,4 0.023 0,000 Rnd 22.0 7.7 0.0 0.005 Presize 61 40.3 0.412 0.388 ---Duct Name: SR -460, Supplies: Opt BR 5 Bath, Effective Length: 7.9 Runout OV 4 46 0.000 Up: ST -750 55 3.1 0.002 0.000 Rnd 7.9 4.4 0.0 0:000 Presize 4 8.3 0,418 0.382 ---Duct Name: ST -750, Feeds Into: Open To Below/Upper Hall, Effective Length: 2.2 Trunk 0.0003 16 273 0.000 Up: ST -740 55 12.4 0,007 0.000 Rnd 2.2 17.5 0.0 0.000 Presize 381 9.1 0,418 0.382 ---Duct Name: ST -760, Feeds Into: Open To Below/Upper Hall, Effective Length: 4.3 Trunk 0,0003 16 270 omo Up: ST -750 55 12.4 0,007 0.000 Rnd 43 17.5 0,0 0.000 Presize 377 18.2 0,418 0.382 ---Duct Name: ST -770, Feeds Into: Open To Below/Upper Hall, Effective Length: 2.1 Trunk 0,0003 16 164 0,000 Up: ST -760 55 12,4 0.003 0.000 Rnd 2.1 17.5 0.0 0.000 Presize 229 8.7 0.417 0.383 ---.Duct Name: ST -780, Feeds Into: Open To Below/Upper Hall, Effective Length: 2.9 Trunk 0.0003 16 120 0.000 Up: ST -770 55 12.4 0.002 0,000 Rnd 2.9 17.5 0.0 0.000 Presize 168 122 0.417 0.383 111111 11 !!Ili iiii IT iiiiii i IN! I I Y.\ ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM Total runout outlet airflow. 966 I Main trunk airflow. 949 Largest trunk diameter: 16 SMT -400 Largest runout diameter: 8 SR -310 Smallest trunk diameter: 16 SACT -400 Smallest runout diameter: 4 SP -260 r Supply fan external static pressure: 0.800 Supply fain device pressure losses: 0.308 } Supply fan static pressure available: 0.492 i Runout maximum cumulative static pressure loss: 0.408 R-290 Return bass added to supply: 0.057 "katal effective length of return ( ft.): 253.3 Upper Floor Ceiling Total effective length of supply ( ft.): 105.1 SR -290 Overall total effective length ( ft.): 358.4 Upper Floor Ceiling to R-290 Design overall friction rate per 100 fL 0.337 (Available SP x 1001 TFL) System duct surface area. (Scenario 1): 502.3 k Attic (Linked to duct load) I Total system duct surface area..: G k { 502.3 I 3 i h I I I E i f Z P k i d P `(:l ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM ---i uct Name: BR4 High, Returns From: Entry, Fittings:6-G,12-T, 6-C, Effective Length: 69.5 Runout 0.0003 7 262 0.004 Up: RT -360 75 5.4 0.018 0.009 Rnd 203 7.7 49.3 0.012 Presize 70 37.1 -0.019 0,012 ---Duct Name: Main Low B, Returns From: Entry, Fittings: 6-G, 12-S, 6-C, Effective Length. 40.5 Runout 0,0003 7 318 0.001 Up: RT -330 75 5.4 0.025 OVO i Rnd 22 7.7 38.4 OV O Presize 85 4 -0,023 0.010 -._Duct Name: Main Low A, Returns From: Entry, Fittings: 6-G, 12-S, 6-C, Effective Length: 40.5 Runout 0.0003 7 318 0.001 Up: RT -300 75 54 0.025 0.010 Rnd 2.2 73 38.4 OVO Presize 85 4 -0.024 OVO ---Duct Name: Main Floor, Returns From: Dining, Fittings: 6 -G,12 -S, 6-C, Effective Length: 117.4 Runout 0.0003 10 422 0.003 Up, RT -350 75 7.8 0,026 0.029 Rnd 9.8 10.9 107.7 oml Presize 230 25.5 0,000 0.031 ---Duct Name: BR4 Low, Returns From: Entry, Fittings: 6 -G,12 -T, 6-C, Effective Length: 123.1 Runout 0.0003 7 262 0.004 Up: RT -380 75 5.4 0V8 0.018 Rnd 203 73 102.8 0:0229 1, Presize 70 37.1 -0,009 0V2. ---Duct Name: Main HIGH & LOW, Returns From: Dining, Fittings: 6-C, 6-+0;12-T, Effective Length: 81.5 Runout 0.0003 11.5 487 u01 Up: RT -310 75 20 0,038 0.030 Rect 1.6 6 79.9 0.031 Presize 406 6.9 0.000 0.031 ---Duct Name: RT -390, Feeds From: Rec Room, Effective Length: 3.1 Trunk 0.0003 16.9 81 0.000 Up: RT -350 75 25 0:001 0,000 Rect 3.1 10 0.0 0.000 Presize 140 18 -0.031 0.022 ---Duct Name: RT -380, Feeds From: Rec Room, Effective Length: 2.1 Trunk 0,0003 16.9 40 0.000 Up: RT -360 75 25 0.000 0.000 Rect 2.1 10 0.0 0.000 Presize 70 122 -0.031 0.022 ...Duct Name: RT -360, Feeds From: Rec Room, Effective Length: 2.1 Trunk 0.0003 16.9 81 0.000 Up: RT -390 75 25 0.001 0.000 Rect 2.1 10 0.0 0.000 Presize 140 12.2 -0,031 0.022 Y:\.,,\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM _--Duct Nance; RT -350, Feeds From: Re `Room, Effective Length. 1;0 Trunk 0.0003 16.9 213 0.000 s U: RT -310 75 25 0.005 0.000 Rect 1.0 10 0.0 0:000 i Presize 370 5.8 _0.031 0:063 ---Duct Name, RT -340, Feeds From: Mech Room, Effective Length. 5.3 Trunk 0.0003 16.9 501 0:002 Up: RT -320 75 25 0:031 0.000 Rect 5.3 10 0.0 O7 002 Prize 1,026 30.6 -0.031 0.064 ---Duct Name: RT -330, Feeds From: Mach Room, Effective Length: 1.1 Trunk 0.0003 16.9 640 0.000 Up: RT -300 75 25 0.036 0.000 Rect 1.1 10 0.0 0:000 Presize 1,111 6. _-0.033 0.066 ---duct Name: T-320, Feeds From: Mech Room, Effective Length. 0. i it Trunk 0.0003 16.9 591 0.000 Up. RT -330 75 25 0.031 0.000 Rect 0.8 10 0.0 0.000 Presize 1,026 4.9 `0.033 0.065 ---Duct Name. RMT -290, Feeds From: Mech Room, Pittings. 5-A, -J1, Effective Length: 127.6 Trunk 0.0003 18.6 574 0.000 Up, Fan 75 25 0.025 0.032 F Rect 0.5 12 127.1 0.032 s Presize 1,196 2.9 4035 0.067 ---Duct Name. RT -300, Feeds From: Mech Room, Effective Length. 2.1 Trunk 0.0003 16.9 689 0.001 Up: RMT -290 75 25 17.041 0.000 Rect 2.1 10 0.0 0.001 Presize 1,196 12.2 4034 0.066 --- Duct dame. RT -310, Feeds From: Rec Room, Effective Length: 1.3 € Trunk 0.0003 16.9 447 0.000 Up. RT -340 75 25 0.019 0.000 Rect 1.3 10 0.0 0,000 Presize 776 7. -0.031 0.064 ---Duct Name. Bsmt Low, Returns From: Mech Room, Fittings: 6-i3, 6-C, 8-A2, Effective Length: 61.0 i Runout 0.0003 10 458 0.001 U. RT -340 75 7.8 0.031 0.018 Rnd 2.8 10.9 58A 0.019 I Presize 250 7.4 -0.013 0.019 Report Units. Pressure: in.wg, Duct lengths: feet, Duet sizes: inch, Airflow: CFM, Velocity: ft.1min, Temperature: F Y:\ ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014, 11:51 AM Y:\ ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM ---Duct Name: Master Ceiling, Returns From: Master Bedroom, Fittings: 6 -t..,11 -A, Effective Length: 140.3 966 Runout 0.0003 14 385 0.001 Up: RMT -180 75 10.8 0.015 0.020 Rnd 7.5 15.3 132,8 0.021 Presize 411 27.6 -0.003 0.021 ---Duct Name: RMT -180, Feeds From: Master Both, Fitting: 5-A, Effective Length: 74.1 Total effective length of return ( it,): Trunk 0,0003 15,3 710 0.000 Up: Fan 75 14 (7.045 0.033 Rect 0.6 14 73,6 0.033 Presize 966 2.7 -0.024 0.057 Total runout outlet airflow: 966 Main trunk airflow: 966 Largest trunk diameter: 153 RMT -180 Largest runout diameter: 16 Upper Floor Ceiling Smallest trunk diameter: 153 IMT -180 Smallest runout diameter: 14 Master Ceiling Runout maximum cumulative static pressure loss: 0.024 Upper Floor Ceiling Return loss added to supply: 0.057 Total effective length of return ( it,): 2513 Upper Floor Ceiling System duct surface area (Scenario 1): 120.4 Attic (Linked to duct load) Total system duct surface area: 120.4 • is an ACCA approved ffianuall J and-iTlanual D computer program, Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All •+ results are estimates as building use and weather may vary. • seAs4le ?.Ai 1,-atQnt I*a-O ?GQ#,r*iAg7t*j tkP. m,2*uf-2c.turer's,,#,erf+riti2.xce ;zt • •e conditions. Y:\.,.\Standard Pacific Plan 5050,rhv Tuesday, February 18, 2014,11:51 AM value 0.31, SHGC 0,33 SP Front. boor- 44 534 0 170 170 SP -Fire Door: Door- 17.8 216 0 69 69 R11 Draped -9. Wall -Basement, Custom, R11 Draped 1046.8 3,798 0 50 50 15B15 -O -8: Wall -Basement, , framing with R-15 sill to 1139 4,222 0 109 109 floor in 2 x 4 cavity, core, no board insulation, plus interior finish, good studs, 8' floor depth 12F-Osw, Wall -Frame, R-21 insulation in 2 x 6 stud 3436.2 15,411 0 2,526 2,526 cavity, no board insulation, siding finish, wood studs 16B-38: hoof/Ceiling-Under Attic with Insulation on Attic 2199 3,945 0 2;628 2,628 Floor (also use for Knee Walls and Partition Ceilings), Vented Attics No Radiant Barrier, Stark Asphalt Shingles or mark fetal, Tar and Gravel or Membrane, R-38 insulation 21 A-32: Floor -Basement, Concrete slab; any thickness, 2 1732.7" 2,392 0 0 0 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 32" wide 0P-30: Floor -Over open crawl space or garage, Passive, 480,6 1,161 0 102 102 '. R-30 blanket insulation, any cover Subtotals for structure: 42,507 0 19,922 19,922 , People. 7 1,400 1,610 3,010 Equipment. 0 2,400 2,400 Lighting: 0 0 0 Ductwork. 14,916 -747 8;021 7,274 Infiltration: Winter CFM: 265, Summer CFM. 249 16„468 -5,392 3,575 -1,811 Ventilation: Winter CFM: 0, Summer CFM; 0 0 0 0 0 Humidification (Winter) 9.37 gal/day. . 3,437 0 0 0 AED Excursion 0 0 2,663 2,663 a Total Building load Totals: 77,327 -4,739 38,191 33,452 Total Building Supply CFM: 1,975 CFM Per Square ft.. 0.372 Square ft, of Room Area: 5,310 Square ft. Per Ton. 1,905 Volume (W) of Cond, Space. 51,690 Total Heating Required Including Ventilation Air. 77,327 Btuh 77327 MBH Total Sensible gain. 38,191 Btuh 100 °lam Total latent Gain: -4,739 Btuh 0 % Total Cooling required Including Ventilation Air. 38,191 Btuh 3.18 Tons (Based On Sensible + latent) Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building • weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. Y:\ ...\Standard Pacific Plan'5050.rhv Tuesday, February 18, 2014,11:51 A value 0.31, ShGC 0.33 SP Front: Door- 44 534 0 170 170 SP -Fire Door: Door- 17..8 216 0 69 69 R11 Draped -9. Wall -Basement, Custom, R11 Draped 1046.6 3,798 0 50 50 15B15 -taw -8: Wall -Basement, , framing with R-15 sill to 1139 4,222 0 109 109 floor in 2 x 4 cavity, core, no board insulation, plus interior finish, wood studs, 8' floor depth 12F-0sw: Wall -Frame, R-21 insulation in 2 x 6 stud 1977.9 8,868 0 1;453 1,453 f cavity, no board insulation, siding finish, wood studs 16B-38: Roof/Ceiling-under Attic with Insulation on Attic 348.3 625 0 417 417 Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark. Metal, Tar and Gravel or i Membrane, R-8 insulation 21 A-3. Floor -Basement, Concrete slab, any thickness, 2 1732.7 2„392 0 0 0 or more feet below grade, no insulation below floor, i any floor, cover, shortest Side of I floor I slab is 2' wide i Subtotals for structure. 26,326 0 9,754 9,754 People: 2 400 460 860 Equipment. 0 2,200 2,200 : Lighting. 0 0 0 I Ductwork. 5,939 -194 2,827 2,633 Infiltration. Winter CFM. 138„ Summer CFM: 129 8,530 -2,791 1,850 -941 i Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Humidification (Winter) 5,05 gal/day : 1,851 0 0 0 i AFD Excursion: 0 0 2„622 2,622 System 1 Basement & Main Floor Load Totals: 42,646 _2,585 19,714 17,128 Supply CFM: 1,025 CFM Per ,quare ft.: l 0.296 j Square ft. of Room Area, 3,461 Square ft. Per Ton. 2,425 Volume (ftp) of Cond. Space. 34,7757 Total heating required Including Ventilation Air: 42„646 Btuh 42.646 MBH Total Sensible Gain: 19,714 Btuh 100 ala Total Latent Gain: -2,585 Btuh 0 % Total Cooling Required Including Ventilation Air: 19,714 Btuh 1.64 Tons (Based On Sensible + Latent) R vac is an ACOA approved Manual J and Manual D computer program. i Calculations are performed per RCCA Manual J 8th Edition, Version 2, and RCCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. 3 I Y:\ ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014, 11:51 A \ ------ Stand ---°2 2nd Floor SummqT,�qqq�__. Stand Pac Fireside: Glazing -Standard Pacific Fireside, u- 241 5,157 0 6,782 6,782 I value 0.31, SHGC 0.33 12F-Osw: Wall -Frame, R-21 insulation in 2 x 6 stud 1458..4 6,543 0 1,073 1,073 cavity, no board insulation, siding finish, wood studs 1513-38: Roof/Ceiling-lander Attic with Insulation on Attic 1850.7 3,3201 0 2,211 2,211 Floor (also use for Knee Walls and Partition F Ceilings)„ Rented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and gavel or Membrane, R-8 insulation 2OP-30: Floor -Cher open crawl space or garage, Passive, 480.6 1,161 0 1012 102 1 R-30 blanket insulation, any cover Subtotals for structure: 16,181 0 10,168 10,168 [ People: 5 1,000 1,150 2,150 Equipment: 0 200 200 Lighting: 0 0 0 ? Ductwork: 8,977 -552 5,193 4,641 Infiltration: Winter CFM_ 128, Summer CFM. 120 7,938 -2,601 1,725 -876 i } Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Humidification (Winter) 4.32 gal/day : 1,585 0 0 0 AED Excursion: 0 0 41 41 System 2 2nd Floor Load Totals: 34,681 -2,153 18,478 16,324 i Supply CFM: 950 CFM Per Square ft.: 0.514 I Square ft. of Room Area: 1,849 Square ft. Per Ton: 1,359 Volume (ftp) of Cond. Space: 16,915 Tenial Heating Required including Ventilation Air.- 34,681 Btuh 34.681 MBH Total Sensible Gain: 18,478 Btuh 100 °lam Total Latent Gain: -2,153 Btuh 0 % Total Cooling Required including Ventilation Air: 18,478 Btuh 1.54 Tons (Based On Sensible + Latent) Rhvac is an \CCA approved Manual J and Manual D computer program. i Calculations are performed per ACOA Manual J 8th Edition, Version 2, and ACOA Manual D. I All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. i l f 3, j I I i 3 l .-_ma.-.._-__ Y.\ ...\Standard Pacific Pian 5O5O.rhv Tuesday, February 18, 2014, 11.51 AM ------------ ..... ... ......... .. ent'Data 7�3y Basement & Main Floor ----------- ------- Cooling System Type: Standard Air Conditioner Outdoor Model* CA13NA030 .... (A,B) Indoor Model: CNPV*3617AL*+TDR Tradename: CARRIER AIR CONDITIONING Outdoor Manufacturer: CARRIER AIR CONDITIONING AHRI Reference No.: 6395167 Nominal Capacity: 27400 Efficiency- 13 SEED Heating System Type: Natural Gas Furnace Model: 59SC213060S1 7-16 Tradename-1 Carrier Manufacturer: CARRIER CORPORATION Description: Natural Gas or Propane Furnace Capacity: 56000 Efficiency. ' 92.1 AFUE ----------- Sp Iy Y. -\..,\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM System Type: Standard Air Conditioner Outdoor Model: CA13NA0 4****(A,R) Indoor Madel: CNPH*301 ✓AL*+TSR Tradename: CARRIER AIR CONDITIONING Outdoor Manufacturer: CARRIER AIR CONDITIONING AHRI Reference No.: 6394909!, Nominal Capacity: 23233 I Efficiency: 13 SEER Heating I System 'Type: Natural Gas Furnace Madel: 5 SC 606 S1 --1 Tradename: Carrier Manufacturer: CARRIER CORPORATION Description: Natural Gas or Propane Furnace Capacity: 56000 Efficiency: 92.1 AFI.IP I 3 : I s�s I 3 7 3 I i Y:\ --Standard Pacific Plan 5050.rhv Tuesday, February 16, 2014,11:51 AM Calculation Mode: • Occurrences: Length: 213.6 ft. System Number.Room Width: 10 ft Zone Number - Area: 214O sq.ft Supply Air: 23 CFM Ceiling Height- 10.0 ft. Changes:Room Supply Air vofume i cu.ft, Number Air: 23 CFM PercentRunout , , Runout Duct Size: 4 in. Actual Summer VenL: 0 CFM Runout Air Velocity. 263 ft./min. Percent of Supply: 0 % Runout Air Velocity,- 263 Umin. Actual Winter Infil.: 1 CFM Actual Loss: 0059 in.wg./100 ft, Actual Summer Infil.: I CFM t Floor -21A-32 1 X 213.6 2116 U20 14 295 00 0 0 for Structure- 924 0 7 Ductwork:Subtotals Room Totals: 1,148 -19 26 r'.\ —\Standard Pacific Pian 5050.rbvTuesday, February 15, 2014, 11.51 AM Room length: 15.3 ft. System lumber: 1 Room Width: 14.5 ft. Zone Number: 1 j Area: 222.0 sq.ft. Supply Air: 46 CFM Ceiling Height: 10.0 _ft. Supply Air Changes: 1.3 AC/hr l Volume.. 2,223.0 cu.ft. Req. hent. Clg. 0 CFM Number of Registers. 1 ; Actual Winter Vent.. 0 CFM Percent of Supply.. 0 % Actual Summer Vent.. 0 CPM Percent of Supply: 0 % ; Actual Winter Infil.: 2 CFM Actual Summer Infil.: 2 CPM NW -Wall -R1 Draped -9 14.5 X 10 NE -Wall -R11 Draped -9 15.3 X 10 145 153.3 0.051" 3.6 526 0.051 3.6 556 0.0 0,0 0 0 6 SE -Wall -R11 Draped -9 14.5 X 10 145 0,051 3.6 526 0.0 0 7 Floor- 21 A-32 i X 222.3 222.3 0.020 1.4 307 0.0 00 Subtotals for Structure: 1,915 0 22 ' Infil.. Win.: 2.3, Sum.. 2,2 44 3.293 146 0122 -40 32 Ductwork: 351 11 } AEE ­11 Excursion:111111­1I'llI'll � . Room Totals: 2,412 -46 75 ; Y:l ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM Room Length: 10.2 'ft. System Number: 1 r Room Width: 6.2 ft. Zone Number. 1 Area: 63.0 sq.ft. Supply Air: 19 CFM i Ceiling Height: 10 0 ft, Supply Air Changes: 1.8 AC/hr Volume: 627.0 cu.ft. Req, Vent. Clg: 0 CFM Number of Registers. 1 Actual Winter Vent.: 0 CFM z Percent of Supply.: 0 % Actual Summer Vent.:. 0 CFM t Percent of Supply: 0 % Actual Winter lnfil,: 2 CFM Actual Summer lnfil.: 2 CFM NF -Wall -15815-g-8 10.e X 1 101.7 0.047 3.8 387 0.1 0 12 SIS-Wall-161316-0ver-8 6.2 X 10 61.7 0.047 3.8 235 0.1 0 7 I Floor -21A-32 1 X 62,7 62.7 0.020 1.4 87 0.0 0 0 Subtotals for Structure: 700 0 19 1 lnfsl.: Win.: 1.7, Sum.: 1.6 33 3.274 107 0.704 -35 23 Ductwork: 139 8 AFt Excursson: ....... ,. - # Rooms Totals: 955 -35 58 :\ ...\Standard Pacific Plan 5050,rhv Tuesday, February 18, 2014,11:51 AM t atculatlon Mode: Htg. & clg: Occurrences: 1 Room Length: 162.2 ft. System Number:: 1 Room Width: 1.0 ft. Zane Number: 1 Area: 162;0 'sq.ft. Supply Air: 111 CFM Ceiling sleight: 10.1 1t. Supply Air Changes: 4.1 AC/hr Volume: 1,635.6 cu.ft. Req. Vent. Clg: 0 'CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 19 CFM Actual Summer Infil.: 18 CFM SW-Wall-12F-Osw 15.1 X 10.1 122 0.065 4.5 547 0.7 0 90 NF-Wall-12F-Osw 10.5 X 10.1 105.0 0.065 4.5 475 0.7 0 78 SE -Wall -1 2F-Osw 10,8 X 10:1 108.4 0.065 4.5 486 0.7 0 80 SW -GIs -Stand P c Fireside shgc- 15 0.310 21 A 321 30.7 0 461 0,330%S SW-Gls-Stand Pac Fireside shgc- 15 0.310 21.4 321 30.7 0 461 S 0,330%S UP -Cell -1613-38 00.7 X 1 90.7 0.026 1.8 163 1.2 0 log Subtotals for Structure. 2,313 0 1,279 Infel.: Win.: 19.4, Stars.. 18.1 366 3.287 1,204 0.713 -394 261 Ductwork: 599 305 1 AD Excursion. 283 Room Totals: 4,116 -394 2,128 a Y:l ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM (A ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM ' rqg Loadr Calculation iY6VUGn. Htg. tX clg. : V.M�IaI L3Sk G+C#v�w"t. Room Length: 382.7 ft. System dumber. Room Width. 1.0 ft. Zane Number: 1 Area: 383.0 sq.ft. Supply Air: 209 CFM Ceiling Height: 10.1 ft, Supply Air Changes: 3.3 AC/hr f Volume: 3,858.0 cu.ft. Reg. Vent, Clg: 0 CFM 4 Number of Registers: 3 Actual Winter Vent.: 0 CFM 1 Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM t E Percent of Supply: 0 % Actual Winter Infil.: 24 CFM Actual Summer Infil.: 23 CFM � SW-Wall-1F-Oswr14.1 X;10.1 111.E 0.065 4.5 5C}2 0.7 0 2 NW -Wall- 1F-Osw 6.2 X 10.1 38.2 0.065 4.5 171 0.7 0 28 NES-Wall-12F-Osw 13.1 X 10.1 131.8 0.065 4.5 591 0.7 : 0 97 4 _ Sly -Wall -12F -O w 12.3 X 10.1 124.0 0.065 4.5 557 0.7 0 91 s I NW -Door -SP Front 3 X 8 24 0.176 12.1 291 3.9 0 93 SW-Gls-Stand Pac Fireside s gc- 15 0.310 21.4 321 303 0 461 0.33 O%S SW -GIs -Stand Pac Fireside shg - 15 0.310 21.4 321 30.7 0 461 1 0.33 O%S x UP-Ceil11 8 62.1 X 1 . 62.1 4.026 1.8 111 1.2 4 ., .. , _ _. 74 .-165- _ t Subtotals for Structure; „ 2,865 0 1,387 Infil.: Win.: 24.4, Sunt.: 22.8 460 3.285 1,512 0.713 -495 328 fDuctwork: 746 578 � AFl3 Excursion. 536 t Equipment: 0 1,200 j Hoorn Totals: I s S 5,123 -495 4,029 1 { i t I I s y 1 1 { (A ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM F Boom Length: 20,8 ;ft. System dumber: 1 Room Width:. 16.9 ft, Zone Plumber: 1 Area: 352.0 sq.ft. Supply Air. 277 CFM Ceiling Height: 10.1 ft. Supply Air Changes: 4.7 AC/hr Volume: 3,554.0 cu.ft. Req. Vent. Clg: 0 CFM Plumber of Registers: 3 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.. 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 20 CFM I Actual Summer Infil.: 19 CFM i I S4�t-Wall-1F-Osvv t3.8 1Cl.t 150 0.065 4.5 57'3 0.7 ` 0 3 110 1 NW-Wall-12F-Osw 16.9 X 10.1 1501.6 0.885 4.5 675 0.7 0 111 P SW-GIs-Stand Pac Fireside gc- 15 0.310 21.4 321 30.7 0 461 0.33 0°1 S SW-Cls-Stand Pac Fireside shgc-- 15 0.310 21.4 321 30:7 0 461 0.33 O%S SW-Cls-Stand Pac Fireside hgc- 30 0.310 21.4 642 30.7 , 0 922 0.33 0%S NW-Gis-Stand Pac Fireside shgc- 10 0.310 21,4 214 25,5 256 0.330%S NW-Cls-Stand Pac Fireside shgcr 10 0.310 21.4 214 25.8 0 258 i 0.330%S Subtotals for Structure. 3,060 0 2,577 Infil.: Win.: 20.2, Sum.: 18.9 :381 3.285 1,250 0.712 -409 271 Ductwork: 734 763 AFC Excursion. 707 Equipment.-1111.1-1-1111 .., 0 1 000 Room Totals. 5,044 -409 5,318 Y":\ ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM , .,.\ tander°d Pacific Plan 5O5O.rhv Tuesday, February 18, 2014,11:51 AM i 5.*C /�G�: GJ L.. � ii �d 7�$ A f AP i!4� 9'r.'"✓' �t�'Gi f iJ't i Y S Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 279.8 ft. System Number: 1 Room Width: 1.0 ft. Zone Number: 1 Area: 2801.9 sq.ft. Supply Air: 77 CFM j Ceiling eight: 10A ft. Supply Air Changes: 1,6AC/hr j Volume: 2,822.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM s Percent of Supply: 0 % i Actual Winter Infil.: 10 CFM i Actual Summer Infil.: 9 CFM t �NW-Wa!FI-12F-0�swI3.4 10.1 105.3 0.065 4.5 472 0.7 0 77 SE-Wail-12F-Osw 3.2 X 10. 1 15 0.065 4.5 67 0.7 0 ! 1 I SE-Wall-1 F-Osw 1.7 X 10.1 16.8 0.065 4.5 75 X1,7 0 12 SE-Door-SP-Fire moor 2.7 X 6.7 17.8 0.176 12.1 216 3.9 0 69 N -Gls-Stand Pac Fireside hgc-- 15 0.310 21.4 321 25.6 0 384 0.33 OTS NW-CSIs-Stand Pac Fireside shgc- 15 0.310 21.4 321 25.6 0 384 0 33O%S ... - .. _ ......_ _........ ._......n .._. _ _.. _ ............. ........ .v__ w _. _ _ .... ... ......... _..... ... , . Subtotals for Structure: 1,472 0 937 1 Infil.: Win.: 9.8, Sum.. 9.2 185 3.283 607 0.714 -199 132 Ductwork: 354 212 AED Excursion: 197 Room Totals: 2,433 -199 1,477 € I t 4 i I € 9 F 6 k i € I K 3iY! I 1, _..,..._._ ...,.,:..y., ...._..»...... ..... ...n_., ,,_:;..,, . .�..; _»,e,....,. .... _,.....,,. . € , .,.\ tander°d Pacific Plan 5O5O.rhv Tuesday, February 18, 2014,11:51 AM Roorn length: 5.7 ft. System Number, 1 Room Width: 9:6 ft, Zone Number: 1 Area: 54.0 sq.ft. Supply Air: 16 CFM Ceiling Fright: 10.1, ft. Supply Air Changes: 1.9 AC/hr Volume: 546.0 cu.ft. Req, Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 5 CFM Actual Summer Infil.: 5 CFM I NW-Wall-12F-Osw 9.6 X 10.1 Subtotals for Structure: 96.6 0.055 4.5 433 433 0.7 0 0 71 71 I Infil.. Win.-. 5.1, Sum.: 4,8 97 3.233 317 0.715 -104 69 Ductwork. 128 26 AFC Excursion. 26 Room Totals. 676 -104 193 l 4 S I 5 S t 1 tl I 1 3 lI C Y:\ ...\Standard Pacific Plan 5050.rhv Tuesday, February 16, 2014,11:51 AM Room Length.. 15.3 ft. System Number. 1 Room Width. 12,3 ft. Zone Number. , 1 Area, 195.0 sq.ft. Supply Air. 140 CFM i Ceiling Height, 10.1 ft, Supply Air Changes: 4.3 AC/hr Volume. 1,971.0 cu.ft. Req. Vent. Clg, 0 CFM Number of Registers. 2 Actual Winter Vent.: 0 CFM ; Percent of Supply.. 0 % Actual Surnmer Vent.. 0 CFM Percent of Supply: 0 °lam Actual Winter Infil.: 22 CFM Actual Summer lnfll,: 20 CFM k NWWaII-12FOs 12,3 X 10.1 110.:5 0.065 4.5 496 0, 0 I 81 NF-Wall-12F-Osw 15,3 X 10.1 136.5 0.065 4.5 612 0.7 0 100 SE -Wall- 1 2F-Osw 12,3 X 10,1 123.5 0.065 4.5 575 0.7 0 94 N -GIs -Stand Pac Fireside sg- 18 0.310 21.4 385 25.5 0 460 I 0.330%S 1 NF -GIs -Stand Pac Fireside shgc- 18 0.310 21,4 385 25,6 0 460 033 0%S UP-Ceil1 B -38195,5X1.. .._ ._ '195.5 _..._O,0 _._.1..8 _ _,.351 .. 1 .2 _ ._..,.. ...._ _._.234 Subtotals for Structure: 2,805 0 1,429 }nfil.: Win.: 21..8, Sum.: 20.4 412 1285 1,352 0,712 -442 293 i Ductwork:: 708 387 AFib Excursion: 359 People-. 200 lather, 230 se r, 1 200 230 Room Totals. 4,865 -242 2,698 Y:\ ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM Room Length: 303.5 f. System Number: 1 Room Width: 1.0 ft. Zone Number: 1 Area: 303.0 s.ft. Supply Air: 71 CFM Ceiling Height: 10.1 ft. Supply Air Changes: 1.4 AC/hr Volume: 3,060.0 cu.ft. Req„ Vent. CIg: 0 CFM 1 Number of Registers: 1 Actual Winter Vent,: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 10 CFM Actual Summer Infil.: 18 CFM I t SW-Wall- 12 F-Osw 2.0 X I1 29A O.065 4,5 132 0.7 0 22 E-Wall-12F-Osw 1.8 X 10.1 17.6 0.065 4.5 79 07 0 13 NE-Wall-12F-Osw 14.1 X 10.1 113.0 0.065 4.5 511 0.7 0 84 SE-Wall-12F-Osw 16.3 X 10.1 164.6 0.065 4.5 738 0.7 0 121 NE-Door-SP Front 3 X 6.7 20 0.176 12.1 243 19 0 77 NE-Gls Stand Pac Fireside shgc 0.310 21 A 171 25 6 0 205 03% _ Subtotals for Structure: 1,874 0 522 Infil.: Win,: 18.7, Sum.: 17.5 354 3.286 1,162 0.713 -380 252 Ductwork: 517 153 AED Excursion:142 Room Totals: 3,553 -380 1,070 i I i I 1 3 3 e:\ ...\Standard Pacific Flan 50O.rhv Tuesday, February 18, 2014,11:51 AM Room Length: 826.2 ft. System Number: 1 Room Width: 1.0 ft. Zone Number: 1 Area: 826.0 sq,ft. Supply .Air: 121 CFM Ceiling Height: 10.0 ft. Supply Air Changes: 0.9 AC/hr Volume. 8,262.0 cu.ft. Req. Vent. Clg. 0 CFM Number of Registers. 2 Actual Winter Vents. 0 CFM Percent of Supply.: 0 % 1 Actual Summer Vent.: 0 CF Percent of Supply: 0 % Actual Winter lnfil.: 8 CFM Actual Summer 1nfil.: 8 CFM SWWaEl-15B15-Ow-8 16.5 10 165 0.047 3.8 628 0:1 0 l 19 NW -Wall -151315 -OW -8 88.2 X 10 348.5 0.047 3.6 1,250 0.1 0 2 g NF -Wall -15B15 -Ow -8 14.2 X 10 142.5+ 0.047 3.8 543 0.1 0 17 SIS -Wall -151315 -Ow -8 9.8 X 10 98.3 0.047 3.8 374 0:1 0 11 f NW -tats -Stand Pc Fireside shgc- 17 0.310 21.4 864 25.6 0 435 6 0.330%S NW -GIs -Stand Pac Fireside shgc- 17 6.310 21.4 364 25,6 0 435 0.330%S Floor -21A-32 1 3C 826. ._., ...e ._ .. 826.2 .., , v.. 0,020 ...... 1.4 ..„_. 1 1.40 _. 0.0 __.... ...t) .a W ...,..l-�._ I Subtotals for Structure. 4,663 0 942 lnfil.: Win.: 8.4, sura.: 7.8 158 3.286 518 0.710 -169 112 Ductwork: 883 209 ; AED Excursion: 194 Room Totals: 6,064 _169 1,457 �:1...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM P Room Length: 204.4 ft. System Number: 1 Room Width: 1.0 ti. Zone Number: 1 s Area: 204.0 s.tt. Supply Air: 58 CFI Ceiling Height: 10.0 ft. Supply Air Changes: 1.7 AC/hr Volume: 2,044.0 cu.ft, Req, Vent. Clg: 0 CFM Dumber of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % i Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 3 CFM Actual Summer Infil,: 2 CFM SW-Wall-15815-Ow-8 13.4 X 10 117.2 0.047 3.5 4018 0,0 ` 0 i NW-Wall-15B15-Ow-86.1 X 10 60.3 0.047 3.8 232 0.1 0 7 1 SW-Wall-151315-O-8 4.3 X`10 43.3 0.047 3.8 165 0.1 0 5, SW-Gls-Stand Pac Fireside shgc- 17 0.310 21.4 364 30.8 0 523 0,330%S i Floor-21 A-32 1 X 204 4 . _._ ., .. _.., _ 204 4 ...... _.._ �.. ,. 0 020 �.. ,. , .. 1.4 282 _..� _.. _ ..._. _. w. _.., 0.0 „ .. .... _n ..... 0 0 .. . Subtotals for Structure: 1,451 0 541 Infil.: Win.: 2.5, Sum.: 2.4 48 3.204 157 0.713 51 34 Ductwork: 274 160 AED Excursion: 148 People: 200 latlper, 230 sen/peri.. ....... 1 200 230 Room Totals: 1,882 149 1,113 { l Y;\ ...\Standard Pacific Plan 50 0.rhv Tuesday, February 18, 2014,11:51 AM Calculatian Maue: Htg. & clg. Occurrences: Room length: 2015 ft. System Number: 1 Room Width: 1.0 fit. Zane Number: 1 Area: 203.0 sq.ft. Supply Air: 46 CFM Ceiling Height, 10,0 ft. Supply Air Changes: 1.4 AC/hr Volume:. 2,035.0 cu.ft, Req. bent. Cig: 0 CFM Number of Registers: 1 Actual Winter Vent,: 0 CIM Percent of Supply., 0 % Actual Summer Vent.: 0 CFM Percent of Supply. 0 % Actual Winter lnfil.: 2 CFM Actual Summer lnfil.: 2 CFM SW Wall ?11 f raped_g i`5 8 C 1 157.5 0.051 " 3.6 572 ' 0.0 0 8 SF Wall R11 trapecl 9 5, 10 53,2 0.051 ,6 215 00 0 3 NF Wall R11 rape 0 10.4 10 104.2 0.051 .6 378 0.0 0 5 SF -Wall -R11 l rapeel_0 10.0 10 103.2 0.051 3.6 305 0 0-, 0 5 Floor -,21 A-32 1 X 203.5. 203.5 _ ...WO,fl2Ci.._...... ., ,w 1,4.. _.... _ 8 CJ.O �._ 0 Subtotals for Structure: 1,842 0 2 lnfil.: Win.: 2.3, Sum.: 2.1 43 3.273 141 0.721 -46 31 Ductwork: 338 10 Ali Excursion: 10 Roam Totals: 2,321 -46 72 Y,\ ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 jUT, Room Length: 186.8 ft. System Number: Room Width: 1.0 ft. Zone Number: 1 Area: 187,0 sq.ft, Supply Air: 158 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 5.5 AC/hr Volume: 1,697.0 ,cu.ft, Req. Vent: Clg: 0 CFM Number of Registers: 2_ Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Rummer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 20 CFM Actual Summer Infil.: 19 CFM i NW-Wall-12F-Osw 1 X 9.1 9A 0.065 4.5 41 0.7 0 7 # NE-Wall-12F-Osw 11.8 X 9.1 77.4 0.065 4,5 347 01 0 57 SE-Wall- 1 2F-Osw 16.8 X 9.1 131.8 0.065 4.5 618 0.7, 0 101 i N-Gis®Stand Pac Fireside shgc- 30 0.310 21.4 642 25.6 0 767 0.33 O%S SE-GIs-Stand Pac Fireside hgc- 15 0.310 21.4 321 30.7 0 461 0.330%S S P-Cel-1613-38 186.8 X 1 186.8 0.026 1.8 335 1.2 0 223 I Floor-20P-30 1 X 186.8. �..... .... ,._.. 186.8 �.... _�; Or03 ._ . �. _ . w 2.4 .. �..... 451. w:.. e. 02 �w;._ , _0 _ �.. ew 9 Subtotals for Structure: 2,755 0 1,655 ## Infil.: Win.: 20.3, Sum.: 19.0 269 4.671 1,258 1.014 _412 273 I Ductwork: 1,494 846 x AED Excursion: 7 People: 200 latlper, 230 ent er:__1 _ _... 200 230 , Room Totals: 5,507 -212 3,011 I i i Y:\...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM Room Length: 3162 It. System Number: 2 Room Width: 1'0 ft. Zone Number: 1 Area: 316.0 sq.t Supply Air: 258 CFM Ceiling Height: 9.4 ft. Supply Air Changes: 52 AC/hr Volume: 2,977.0 CLLt Req. Vent, Clg: 0 CFM Number of Registers: 3 Actual Winter Vent,: 0 CFM Percent of Supply.: 0 % Actual Summer Vent., 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 25 CFM Actual Summer Infil.- 23 CFM NW-WaI1-12F-0sw 15.4 X 9.4 130.3 0.065 4.5 584 0.7 0 96 SW-Gls-Stand Pac Fireside shgc- 15 0.310 21.4 321 30.7 0 461 0.330%S SW -GIs -Stand Pac Fireside shgc- 15 0.310 21.4 321 303 0 461 033 O%S SW-Gls-Stand Pac Fireside shgc- 30 0.310 21.4 642 30.7 0 922 0,330%S NW -GIs- Stand Pac Fireside shgc- 15 0.310 21.4 321 25.6 0 384 0.330%S UP -Cell -16R- 8 316.2 X 1 3162 0.026 . ...... 378 Subtotals for Structure: 3,318 0 2,794 Infil.: Win.: 24.9, Sum.: 23.3 331 4.671 1,544 1.016 -506 336 1 Ductwork: 1,810 1,408 AED Excursion: 11 People:200fat/per, 230 sen/per: 2 400 460 Room Totals: 6,672 -106 5,009 Y.\ ...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM Room Length: £3.9 ft. System Number: 2 Room Width: 8.3 ft. Zone Number: 1 Area: 74.0 sqJt. Supply Air: 50 CFM Ceiling Height: 9.1 ,ft, Supply Air Changes: 4.4 AC/hr Volume: 675.0 cu.ft. Req. Ment. Clg: 0 CSM .umber of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 6 CFM �NE-Wa�11-12F-O�sw&9F91�71 Actual Summer Infil.: �0,0�65�4.5� ��O7��O�52� 6 CFM NE-GIs-Stand Pac Fireside shgc- 10 318 0.310 21,4 214 25,6 0 256 0.33 0%S UP-Cell-16R-38 74.3 X 1 74.3 0.026 1.8 133 1.2 0 89 Floor-20P-30 1 X 74.3 _..._ 74.3 0.035 2,4 179 0.2 0 ..... .._ 16 ..__,.:..-_ Subtotals for Structure: 344 0 413 Inf�l.: Win.: 6.1, Sum.: 5.7 81 4.667 378 1.012 -124 82 Ductwork: 455 273 ED Excursion: Equipment: 0 200 Room Totals: 1,677 -124 970 Y:i ,..\Standard Pacific Plan 5050.rhv Tuesday, February 18„ 2014,11:51 AM Calculation Mode* Htg. & c1g. Occurrences: 1 Room Length: 76.5 ft. System Number: 2 Room Width: 1.0 ft, Zone Number: I Area: 76.0 sq.ft. Supply Air: 21 CFM Ceiling Height: 9"1 ft. Supply Air Changes: 1.8 AC/hr Volume: 695.0 u.ft. Req. Vent, CIg: 0 CFM Number of Registers: 1 Actual Winter Vent., 0 CFM Percent of Supply.: 0 % Actual Summer Vent.., 0 CFM Percent of Supply* 0 % Actual Winter Infil.: 4 CFM Actual Summer Infil.: 3 CFM UP-Ceil-1613-38 76,5 X 1 76,5 U26 1.8 137 12 0 36 91 Floor -20P-30 1 X 69.5 69.5 0.035 2.4 168 02 0 Subtotals for Structure: 526 0 142 Infil.: Win.: 3.7, Sum.: 3,5 49 4.674 230 1.016 -75 50 Ductwork- 281 75 AED Excursion: ............... Room Totals: I 1,037 -75 268 313 Y:\ .,.Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM Room Length: 196.8 ft. System Number: 2 Room Width: 1.0 ft. Zone Number: 1 Area: 197.0 sgJt. Supply Air: 98 CFM Ceiling Height: 9.1 €t, Supply Air Changes: 3.3 AC/hr Volume: 1,787.0 cu.ft. Req. dent. Clg: 0 CFM Number of Registers: 2 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 19 CFM Actual Summer lnfil.: 17 CFM SW-Wall-1F-Osw 15.8 X'9.1 SE-Wall-12F-Osw 11.4 X 9.1 140:7 88.7 0.065 0.065 4.5 545 4.5 398 0.7 0:7 0 0 106 65 SF` -tats -Stand P c Fireside gc- 15 0.310 21 A 321 30.7 0 461 0.330%S UP-Ceil-16S-38196.8 X 1 196.8 01026 1.8 353 1.2 0 235 Floor -20P-30 1 X 71.4 71.4 0.035 2.4 173 0.2 0 15 Subtotals for Structure: 1,890 0 882 Infil.: Win.: 18.6, Sum.- 17.5 247 4.672 1,156 1.014 -379 251 Ductwork: 1,134 535 AF{a Excursion: 4 People: 200 latiper, 230 senlper: 1 200 230 Room Totals: 4,180 -179 1,902 (:\ ...\Standard Pacific Plan 5050;rhv Tuesday, February 18, 2014,11:51 AP I Room Length: 5.8 I'L System Number: 2 Room Width: 10.5 ft. Zone Number: 1 Area: 60.0 sq.ft. Supply Air: 27 CFM Ceiling Height: 91 ft. Supply Air Changes: 10 AC/hr Volume: 548.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: I Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil- 7 CFM Actual Summer Infil.: 7 CFM UP-Ceil-1 613-38 604 X 1 60,4 0.026 1.8 108 1.2 0 72 Subtotals for Structure: 536 0 142 Infil,. Win,: 7.2, Sum.: 6.7 95 4,668 445 1.017 -146 97 Ductwork- 365 94 AEE Excursion. Room Totals: 1,346 -146 333 Sat --------- - ----- -- ---------- I Y:\ .,,\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM m iff`,i s , sit �ii ��t ttt 'i itCt 11 tt' 1 1 It ti l 1 lit 1' 111 1111 11111 litsl til 1 ;tzll `�,"" �'.t Ft., i i• d '�!*T`p �tl +., til i. i 1 1 i t Slj � 11 t� t t ., it4� } T 1 ttt 111 i t ll F }/wq ��ppq.rgg/ jf ppy; )f my�ry. ./j fg y�cyulyY ff.jf,j, y✓ry ¢pw..agry ,}�qp .___Y � �Ax"W �t �✓ Fd"� �a�lu.T: �i � f :A �hJ%: &[ d {/}+Y/ RMf ......,��N � )f1f( I Calculation Mode. Htg. & clg. Occurrences: 1 Room Length: 291.3 ft. System Number. 2 } boom Width. 1.0 ft. Area. Zane Number. 1 291.0 sgaft. Supply Air, 110 CFM Ceiling Height. 9,1 ft. Supply Air Changes. 2,5 AC/hr Volume: 2,646,0 cu.ftr Req. Vent. Clg. 0 CFM Number of registers. 1 Actual Winter Vent.. 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply, 0 % Actual Winter lnfil.. 19 CFM i J; Actual Summer lnfil.. 18 CFM i P FW-WaFI-12F-0�swlO.8 �Xg.l�� 97.6 �0.0�65�4.5� 438 0.�7��O�72 NE-Wall-12F®Osw 15.1 X 9.1 106,9 0.065 4.5 480 0.7 0 79 SE-Wall-12F-Osw 2 X 9.1 18.4 0,085 4,5 83 0.7 0 14 { NE -Cls -Stand Pae Fireside shgc- 30 0.310 i 21.4 642 25.6 0 767 0.33 O%S UP-Ceil 16r 38 291.3 X 1 291.3 0.026 1.8 523 1.2 0 348 Subtotals for Structure. 2,166 0 1,280 c lnfil.. Win.. 19.1, Sum.. 17.8 253 4.673 1,182 1.016 -387 257 i { Ductwork: 1,246 603 AEC} Excursion: 5 j Room Totals: E g� I 4,594 -387 2,145 3 E i [C I i l .......... �., ry _ m_ _. ------- _ ._ l 1 3 i E _— _m - i*:\ —\Standard Pacific Plan 50 0.rhv Tuesday, February 18, 2014,11-51 At Calculation Mode: _- Htg. & clg. Occurrences: Room length: 237,9 ft. System Number: 2 Room Width: 1.0 ft. Zone Number: 1 Area: 238.0 sq.ft. Supply Air: 122 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 3.4 AC/hr Volume: 2,160.0 cu.ft. Req. Vent. Clg: 9 CFM Number of Registers: 2 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter lnfil.: 13 CFM Actual Cummer Intil,: 12 CFM I s W Wa11 12F-Osw 12 X 9:1 9 0.06x' 4.5 X54 0 58 IOW-Wall-12F-Osw 2 X 9.1 18.2 0.065 4.5 81 0.7 0 13 s SW-Wall-12F-Osw 1.2 X 9.1 10.6 0.065 4.5 48 0.7 0 8 W-Wall-12F-Osw 1.2 X 9.1 11.4 0.065 4.5 51 01 0 8 SE -Wall -12F -Os 1.9 X 91 17.4 0.065 4,5 78 0.7 0 13 SW -Cls -Stared Pac Fireside shgc- 15 0.310 21.4 321 30.7 0 461 0,330%S SW -Cls -Stand Pc Fireside shgc- 15 0.310 21.4 321 30.7 0 461 0.330%S UP-Ceil-16 -38237.9 X 1 237.9 0.026 1.8 427 1.2 0 284 Floor -20P-30 1 X . _.._.. _ ...,_. . _ _ 7,8 0.035 x... _4 . _ ._ .. e..n1_.. _ . -,.......0.2 -,_ _.-....__ Subtotals for Structure' 1,700 0 1,308 Infil. Win.. 12.5, Sum.. 11.7 167 4.672 778 1.015 -255 169 Ductwork, 922 669 AFD Excursion: 5 People: 200 lat/per, 230 sen/per: 1 200 230 Room Totals. 3,400 -55 2,382 Y:\ ...\Standard Pacific Plan 5050,rhv Tuesday, February 18, 2014, 11:51 A L.,alcujavon moae: ti1g, & c1g. occurrences: I Room Length: 342.1 ft. System Number: 2 Room Width: 1.0 ft. Zone Number: I Area: 342.0 sqJL Supply Air: 106 CFM Ceiling Height: q'I t Supply Air Changes: 2,0 AC/hr Volume, 3,108.0 cu -ft, Req. Vent. Ci: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 13 CFM Actual Summer Infil.: 12 CFM NE-Wall-12F-Osw 14.1 X 9.1 97.8 0,065 4.5 439 01 0 72 SE -Wall -1 2F-Osw 5.4 X 9.1 48.9 0,065 4.5 220 0.7 0 36 NF -Cls -Stand Pac Fireside shgc- 30 0.310 21.4 642 25.6 0 767 033 O%S UP -Cell -1 613-38 342.1 X 1 342,1 0.026 1.8 614 12 0 409 Floor -20P-30 I X 68.3 683 0.035 2.4 165 02 0 ....... .... . . . . .. 111-111-1 14 Subtotals for Structure: 2,080 0 1,298 Infil.: Win,: 13.3, Sum.: 12.5 177 4x672 826 1.013 -271 179 Ductwork: 1,082 579 AED Excursion:5 .... ..... . ..... .. .. .. ............. ........... .. . ......... . ... ....... . . ... ... . .. ............ . Room Totals: 3,988 -271 2,061 (:\..,\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM Calculation Mode: Htg. & c1g. Occurrences: I Room Length: 8.6 ft, System Number., 2 Room Width: 5.8 t Zone Number: I Area,- 49.0 sq.t Supply Air. 4 CFM Ceiling Height: 9.1 ft. Supply Air Changes: 0.6 AC/hr Volume: 448.0 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: I Actual Winter Vent.* 0 CFM Percent of Supply.: 0 % Actual Summer Vent.: 0 CFM Percent of Supply: 0 % Actual Winter Infil.: 0 CFM Actual Summer Infil.: 0 CFM 59 Floor -20P-30 1 X 24 2.4 0.035 2.4 6 02 01 Subtotals for Structure: 95 0 60 Infil.: Win.: 0.0, Sum.: 0.0 0 0 0 0 0 0 Ductwork: 35 24 Ali Excursion: 0 Room Totals 130 0 84 Y.\..,\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM Room Length: 5.8 ft. System Number: 2I Hoorn Width: 3.3 ft. Zone Cumber. 1 Area; 10.0; sq.ft. Supply Air; 16 CFM E Ceiling Height: 0.1 ft. Supply Air Changes: 5.6 AC/hr Volume: 174.0 cu.ft. Req. Vent. Cig: 0 CFM Number of Registers; 1 Actual Winter Vent.: 0 CFM Percent of Supply.: 0 % I Actual Summer Vent.: 0 CFM Percent of Supply. 0 % I Actual Winter lnfil.: 2 CFM ti i Actual Summer infil.. 2 CFM l t NW-Wall-12F-Osvwr 3.3 X 3,1 NW-Gls-Stand Pac Fireside shgc- 24.2 6 RON 0.065 4.5 100 0,310 21.4 128 0.7 25.5 0 0 18 I 153 z 0.33 O % UP-Ceii-16B-38 10.2 X 1 102 0,026 1.8 34 1.2 0 23 Subtotals for Structure: 271 0 104 t Infil.: Wirt.; 2.3, Sum.: 2.1 30 4.663 141 1.025 -46 31 Ductwork: 153 88 1 AED Excursion:1 e .... .. Room Totals: 565 -46 314 i I 1 i l i t I i E 3 i r:\ ;,.\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM I Mech Room 214 1,148 23 1.4 263 26 -19 1 23 Unfinished 222 2,412 48 7 75 -48 4 48 Storage A Natural Gas or Propane Furnace Efficiency: 92.1 AFUE 13 SEER Sound: BSMT Bath 63 955 19 4 _ 58 -35 3 19 4 (apt 162 4,116 83 7 _ 2,128 -394 118 111 Office/Hobby/Mud Rm 5 Kitchen/Nook 383 5,123 103 7,7,7 - 4,029 „495 224 209 6 Great Room 352 5,044 101 7,7,7 - 5,318 -409 296 277 7 Dining 280 2,433 49 7 1,477 -199 82 77 8 Bath 3 54 878 18 3 193 -104 11 18 9 Bedroom 4 195 4}865 98 7,7 - 2,698 -242 150 140 , 10 Entry 303 3,553 71 7 _ 1,070 -380 59 71 20 Rec Room 826 6,064 122 7,7 - 1,457 -169 81 121 21 BSMT Bedroom 6 204 1,882 38 7 - 1,113 149 62 58 22 Unfinshed Storage 203 2,321 47 6 - 72 46 4 46 Humidification 1,851 Duct Latera t -194 System 1 total 3,461 42,646 818 19,714 -2,585 1,096 ., 1,025 System 1 Main Trunk Size: 25x12 in ; Velocity: 492 ft./rain j Loss per 100 ft.: 0.020 in.wg aboveDuct size results • i See the Manual D Ductsize report for duct velocities and other Actual. 2.28 100%/0% 27,400 0 2/,4UU Reafiincl System.... Coolie S stem Type. Natural Gas Furnace Standard Air Conditioner Madel: 59SC213060S17--16 CA13NA030***.(A,B) Indoor Model: CNPV*3617AL*+TD Brand: Carrier CARRIER AIR CONDITIONING Description: Natural Gas or Propane Furnace Efficiency: 92.1 AFUE 13 SEER Sound: Capacity: 56000 27400 Sensible Capacity: n/a 27,400 Btuh Latent Capacity: n/a 0 Btuh AHRI Reference No..: n/a 6395167 Y:1...\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM a-- I ---Zone 1--- Neatin Ste! Cooling System Type Natural Gas Furnace Standard Air Conditioner Model; 59 aC2B060 517--16 CA13NA024****(A B) I I 11 Bedroom 2 187 5,507 111 7,7 3,011 -212 167 155 12 Master Bedroom 316 6,672 134 7„7,7 5,009 -106 279 258 13 Laundry 74 1,677 34 5 970 -124 5 50 14 Bath 2 76 1,037 21 4 263 -5 15 21 1 15 Bedroom 3 197 4,180 84 6,6 1,902'' -179 106 198 16 Her WIC 60 1,346 27 4 333 ` -146 19 27 17 Master Bath 291 4,594 92 8 - 2,145 8 119 110 18 Bonus Rm/Opt 238 3,469 68 7,7 - 2,382 -55 132 122 ; Bedr 5/Opt } MSTR Retreat 19 Open To 342 3,988 80 8 2,061 -.271 115 106 Below/Upper Nall 23 Opt BR 5 Bath 49 130 3 4 - 84 0 5 4 E 24 WC 19 565 11 4 - 314 -46 17 16 Humidification 1,585 Duct Latent -552 € System 2 total 1,849 34,681 665 18,478 -2,153 1,028 959 l System 2 Main Trunk Size. 16 in. ' Velocity. 689 ft./min Loss per 100 ft,. 0,036 in.wc3 I i Duct size results above are from Manual D Ductsize. Runout duct velocities are not printed with duct size results from Manual D Ductsize since they can vary within the room. s See the Manual D Ductsize report for duct velocities and other data. ? 09 f Y:\ ...\Standard Pacific Flan 5050.rhv Tuesday, February 18, 2014,11:51 AM Neatin Ste! Cooling System Type Natural Gas Furnace Standard Air Conditioner Model; 59 aC2B060 517--16 CA13NA024****(A B) Indoor Model; CNPF1*3017AL*+TDR Brand: Carrier CARRIER AIR CONDITIONING Description: natural Gas or Propane Furnace Efficiency: 92.1 AFUE 13 SEER Sound: Capacity 56000 23200 Sensible Capacity. n/a 23,200 Btuh Latent Capacity: n/a 0 Btu ANRI Reference No.. n/a 6394909 Y:\ ...\Standard Pacific Flan 5050.rhv Tuesday, February 18, 2014,11:51 AM Y.\ ...1 Standard Pacific Plea 5050.rhv 'Tuesday, February 18, 2014,11-51 AM + r N s + ii*• !N M � +.+ •� *+� as r J t r MF • 00 Northeast, '38,193 '-4,739 + 450 East i♦ 37,875• Southeast 1,945 34,972 -4,737 291 South900 13511 1,758 + -4,742 2.63 1800 Southwest +#+ Iii+ 2. ++ 22511 West t 36,575 -4,737« 2700 Northwest01 1! -4,740 3.00 North31511 Y.\ ...1 Standard Pacific Plea 5050.rhv 'Tuesday, February 18, 2014,11-51 AM Indicates highest value of all rotations, i 450 East 1,0132 18;551 -2,585 1 x55 g 901, Southeast 917 15,453 -2,535 1.37 I 13511 South 8501 15,235 -2,535 1.27 ! i 1803' Southwest 946 17,0117 -2,585 1.42 225° West 953 17,317 `2,585 1.44 i 2701° Northwest 979 17,6035 -2#585 1.47 3150 North 949 17,0158 ..2,585 1.42 Indicates highest value of all rotations. 31511 North 9032 16,224 45" East *1,074 19,314 «2,152 *1.81 900 Southeast 1,0128 18,484 -2,153 1.54 ` 135" South 9018 16,3301 -2,157 1.38 18011 Southwest 1,9501 18,873 -2,151 1,57 2251, West 1,0171 19,258 -2,152 1.601 I 270311 Northwest 1,0123 18#395 -2,154 1x53 i 31511 North 9032 16,224 2,158 1.35 ; * Indicates highest value of all rotations. Building Rotation Tannage w.W+�ww�f"wWMw+ww t. i t 3. t............ ..... ... ,,. . ....... . .,...... ....« „ «, ..«. ...... 10 (( xm29«... ..,...»..,.. .. ...»» .. .. . .. ,» ,....... , «.. « 28 T.. , ............ ...... ... tVVw� ,« . . .. ., .,.. . . , ,. . . .... i �ry'�.` 2.7t.. ........» . . ., ., .. , ... ....» . , ............... . . ................. k }f 2.6 Northeast East Southeast South Southwest West Northwest North (.\ ,..\Standard Pacific Plan 50501:rhv Tuesday, February 18, 2014,.11:51 AIM . ... ..... . 32,0001- 31,000 30,00011. .......... 29,0004 ... ............ 27,000 ...... 26,000 - ----- -- ------ ... . ....... ------ -------- -f - ----- ____-- ....... 8 am 9 am 10 am 11 am 12 pm I pm 2 pro 3 pm 4 put 5 pm 6 pm 7 pm Time of Day Front door faces Northeast Front door faces East Front door faces Southeast Front door faces South Front door faces Southwest Front door faces West Front door faces Northwest Front door faces North Y.\.,.\Standard Pacific Plan 5050.rhv Tuesday, February 18, 2014,11:51 AM SR -200,r,58 CFM,Re9:lOx4 Unfirishod Storage 511,370,15",46 CFM,Ro9r1Ox4 1 11 - T ---[ 'I-,","-, I 1 711 Transfer - ----- Griffe Rec Seem 102"duct with BSMT Bath �Oxfi duct to main men 5 , SR -220,4",19 CFM,Reg2lOx4,D0 NOT INSTALL IN DUCT 7- r It unfinished tmseannO do ma install this vupaiy -, -1"" ilf sA-i9tLr,,67 CM,RegAM Bsa#Low,l0",250CFM,GdHeA2x12 a.t 7 101, Nota: ff Unfinished Basement Instati or, a Baiting ROMM at least 10 last ham water haste, rq' C unfinisho Sr�eaqe A r 14X6" Transfer Note: It basement is Grille unfinished Install all .6 III supplies as shown r except basement bath SR420,7",48 CFM,ReqAOx4 Install Balancing dampers on all supplies Low energy consumption criteria, building design equipment locations and local building code requirements may hinder customer comfort preferences. Continuous Slower operation may be required to equalize temperature differences Calculations Indicate that the provided return air vents are sufficient; however provide additional return as dictated by performance requirements Rage iaza,irxir fts$e: ata";: IV *rawn: Approved: Date: Job Number: Cf`MROg:VOX4 SR -130,7,70 CFM,Ra9AOx4 Oso S"40,7-,92 CFM,R*g1Ox4 SR -100,7"A2 CFM,R#Q:1OX4 OJA Offtftbblrldfll 14x6" Transfer Grifts 1 ti M 1 10,7",92 CFM,ReWlOX4 Kitchetv'Nook SR -2,7",70 CFM,Re9A0aX4 Great Room itis Ma;nHtGH&LOW,2Dx6",40$CFM,Grillc(2)16XI6 T .. .. ... ... SR-160,7,?'7,,CFM,"AOx4 rai Main FWw,,1W',230 CFMGdrfe14x6 Entry Low Aas CFM ,GMWA2x6 �u 30x6" Return GrilleUE-1 MainLow UM'(1000: 1 2X6 SR-160,3-,18 CFM,ROgAOX4 CFM,ReWlOx4 Hedto SR -350,7",70 CFM,RegA0 SR4 Wgh,7",70 CFM,GrH1e12x6 8R4`Low,7",70 CFM,GdHOZ12x6 SR -170,7",70 CFM,Reg�100 Install Balancing dampers on all supplies Low energy consumption criteria, building design equipment locations and local building code requirements may hinder customer comfort preferences. Continuous Slower operation may be required to equalize temperature differences Calculations Indicate that the provided return air vents are sufficient; however provide additional return as dictated by performance requirements gage Stares 11x17" Scale; IM". IV' Drawn: Approved: Date: Job Number: Nate: it Ma aprt-W 6aa+erl m do Mt 4n8ta6 xaPptp SR•466,4",4 CFM,Reg:lOx4 t SR -450,7",61 CFM,Reg;.'{Ox4 a SR -4194„r',61 CFM,Reg.90x4 i SR -240,6",49 CFM,Reg:10x4 /' t �' SR -290,7r',66 CFM,Re9:10x4 SR -410,7",66 CFM.Reg1Ox4 SR-390,6',494(ZFM9,€ gAOx4 ” t 4 t 3 t .3Wr',86 CFM,RtagAOx4 Bedroom 3 MasC'odroatrt SR -260.4",21 CFS# Reg.14x4 '°�" �i � ;= ff '' ($ aa€n 2 seh SR -380,7`",i7 GFbi R+ag;10x4 t i3 _ _ _ ::,i i .:.- , "� J -Her VVIC -• n r1rc Master Ciating,14",411 CF10„idrdfle.l6x Crites Lsundry ii WC SR'320,4'°,27CFM,RegA0x4 r c Ogen 7Q BgfovrtUppor Hatt SR -440,4"„16 CFM,Reg.10x4 k Mester Both Upper Hour Cezfptng,16",6655 CFM,OrHW2Ox20 J SR -28D,6",50 COM,R*9AOx M310,8".110 CFM7,Reg:14x6 SR-250,r,,77CFM,Rogt10x4 tt 1 / L --j 6" Exhaust Fan exhausting 97 CFM 24hrsdday,Location SR -330,8"',106 CFM,Reg:14x6 based on efectrica€ Install Balancing dampers on all supplies Low energy consumption criteria, building design equipment locations and local building code requirements may hinder customer comfort preferences. Continuous Blower operation may be required to equalize temperature differences Calculations Indicate that the provided return air vents are sufficient; however provide additional return as dictated by performance requirements Page Site 11x17" Scale; Va" c 1'0" oufliiwwi� TRACT w ^womo 21- ix t00% a er p_ N ... W .41 .e Ict lox f. o 4. , ^� x coz. 27.2V tm' P 0 m � �. p� fflLi� � in 32.7' i �c ma p4i x too 4 C � rn oufliiwwi� TRACT ^womo 21- ix t00% a er p_ ... W .41 .e Ict lox f. o 4. , ^� x coz. 27.2V tm' d�ta co �. p� fflLi� � in 32.7' i p4i x too 4 C rn > wr "". >. , coa 7R M-6 644 CL^.. City of W3.6atR I d C ,,,�g COMMUNny DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033-8001 P: 303,235.2846 F: 301235,2857 March 20, 2014 OFFICIAL ADDRESS NOTIFICA Z2IR!EAjMNMP CODE CORRECTION NOTIFICATION is hereby given that the following address has been assigned to the property/properties as indicated below: PROPERTY OWNER(S): Standard PaciFic of Colorado Inc. A Delaware Ca ration OLD ADDRESS: None '90 abor Cr. Wheat Ri d e Co '0033 '0 NEW ADDRESS: 3 "0 't'ab � or Ct. 80033 Block 1_ Lo t25 3870 ab I or Ct. 80033 033 3 60 1, ab 8 or Ct Ile t Ri e C W 0�810033 80033 3 5 Ta b or 8 0 T or Cr. Ct W heat R i C e 081 Blac o 'oc t 2 8 Block 1 -Lor 6 3801 Taft Ct. Wheat Rtd e C{ 3 3830 T abor Ct. Tab block l _ I of 3819 `Taft Ct, Wheat I2id e CC) 3 Black 1 Lor 9 3829 Taff Ct. Wheat Rzd CC 3 Black t -Lot 10 3839 "Taft Ct. Wear Rid e CC? 33 Stock l _Lot 11 384 Tafr Ct. Wheat Rid e C) 33 Black 1 -Lor 12 38E9 Tafil Ct. Wheat laid >e C( 33 33 Block I Lot t4 3889 Taft Ct. Wheat Rid e CCU 33 'oc "o' '90 abor Cr. Wheat Ri d e Co '0033 '0 Block I - Lot 4 3 "0 't'ab � or Ct. W heat: e R id 80033 Block 1_ Lo t25 3870 ab I or Ct. Wheat Ri e 0 80033 C B l ack 1 Lot 26 3 60 1, ab 8 or Ct Ile t Ri e C W 0�810033 S to c k Lot .1 1 7 3 5 Ta b or 8 0 T or Cr. Ct W heat R i C e 081 Blac o 'oc t 2 8 384 Ta b 0 or Ct' t R ea 80 0 0033 d e �Q� : Mac k 2 I -ot 9 3830 T abor Ct. Tab i Co hea R �e 33 �( 8 � �ock I Lot 30 38 0 or Ct Wheat Co e R id 80�033 3 Black 2 - Ilot 3 383E `Taft Ct. Wheat. Rid e CCU 80033 Black 2 - Lat 4 3848 Taft Ct. Wheat Rid e fC} 3 3 33 WWWA-Wheatridgexo.us I 1] IM1 4 JIM I I I 101 (Block l,ot 1 2 3871 Tabor Q. Wheat Rid (Block 2 – Lot 13) 3861 Tabor Ct.,Wheat Ridge, co 8o033 Block 2 -• -Lot 14 3851 Taber Ct. Wheat Rid e CC) 80033 (Block 2 -.- Lot 15113841 Tabor Ct,,Wheat Ridg cO 80033 fRIA01- I – T tit I Al 'A R I I 'rnl nr Of 1X71-4 DA,.- f^t onlill SUIRDIVISION: Doud Overlook Subdivision aka Fireside at Youn field Subdivision LOT(S): KEY: SECTION: — JEFFERSON COUNTY RECEPTION #: 2013143668 9mmmusm NOTES: This is a courtesy notification, AUTHORIZED BY. DATE: JUL-11timu NOTE: Please notify all other parties concerned. ADDRESS MAP UPDATED BY: DATE: R69W 601 ALUM. PPE W/ 3 -1/4 GRASS CAR EO STAMP LS 13212' N RANK 8O% PONT 14109 N-708326.7466 E- 1025512566 T35, P.2' I I I I 1 I i I I I I I� i� 1 I, M la IY� IW I I LOT 11 3819 0710 38M P p TV s s O 11858 11842 11828 NEST 39TH PLACE 0 2 1871 11851 RP 11831 G 2 11811 • 0 0 o s 398 H.O.A. C 3881 LOT 7 LOT 12 3884 3871 LOT 6 LANDSCAPING 3872 LOT 13 3881 LOT 5 C 3550 LOT 14 I 3851 3821 LOT 4 3848 LOT 15 3841 LOT 3 3836 1 <\ 1 0 LOT 22 11810 TRACT 8 E. 1/4 CORO" SEC. 20 T35, R69W 6TH P.Y. S AIW. i'Pf W/ 3 !BASS CAP l STAIIREEI ,313=13- N RAHOE E01 05310 ADDRESS PLAT PONT 14209 11212' N 9 RA" 0.1 a•0 DOUD OVERLOOK SUBDIVISION FILING NO. 2 BEING A REPLAT OF A PORTION OF DOUD OVERLOOK SUBDIVISION, --� LOCATED IN THE WEST HALF OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 20 AND THE WEST HALF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 29, `s TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN, I CITY OF WHEAT RIDGE, COUNTY OF JEFFERSON, STATE OF COLORADO 48 LOTS, 5 TRACTS & PUBLIC R.O.W. — 14.872 ACRES I 1 r 1 LOT 23 3890 1 rI �1 I TRACT USE I A 1 HO.A LOT 16 3831 1 H.O.A. C t UTUTE3 LOT if D UTRITES DRAINAGE k EYEROENCY ACCESS LOT 2 E LANDSCAPING N.O.A. TRACT C 3889.5 LOT 14 C 3m I 3824 3821 LOT 24 3880 h LOT 25 3870 M I LOT 26 3880 LOT 27 3850 LOT 28 3840 LOT 29 3830 1 * I LOT 17 - - - - * I j I 1 3812 11831 O M LOT 8 LOT 1 _ LOT 30 MI 3819 O 11871 3820 1 C I y8T11 PU►_�� POINT a T LS ,ea7 _r LOT 7 w -' TW •1RACT 0 LOT 31 + Lr 11820 t — 'a UN v K I? 3610 BRASS CAP y1p 11880 c r�oR7risioo 1331:• N RANK NI2 I 11890 11880 1 N- 7056727126 E- 1025618715 I 3801 W N O 3800.5 1RACT SE 1/4 SEC. 20� CAP 1 0 of ��` `� 1M►Tf �— _—J DD05TM0 \ I I2' LIB I N I I 1 I I IR TRACT USE TABLE TRACT USE OWNER A LANDSCAPING HO.A 8 DETEMI110H POND k VTMUTES H.O.A. C t UTUTE3 H.O.A. D UTRITES DRAINAGE k EYEROENCY ACCESS H.O.A. E LANDSCAPING N.O.A. 1 N N.O.A. -HOME OWNERS ASSOCIATION 1� I I I IEOE10 1 Nlocx ,RrLR SICWaR COINER R4W. RMT -OF -MY "ammy Lm LOT LINE 0057N0 PLATS rz:71cm uw ROAD O911ER Lm I x I 1 -4 POINT Of OMSV ICDIENT BE CORRNf SEC 20 TM. RRf 6TH P.Y. AWL PPE W/ 3-1/4 BRASS CAP STATED. %S 13512' N RANK BOX PONT ism — — N-705701.5458 E.1052301675 I I— 'SCALE: 1" - 60' CPI Vry.AL tPAOM: _:..LI DEVELOPER ENGINEER \SURVEYOR rlr`■rsn.�6 *"DAIQDPACtfjcHomjs CA RROLL& LA NGE- MA N HARD •/•RV6,Nro anLelA1►a aoYRWPn V A .P. a •et1`..- ��ira: �WriWR.i...�ow1• LOT 16 i LOT 17 11874 ' 1182'0 LOT 16 { I 3901 I 11900 I I LOT 15 V 3899 1 1 I TRACT C 3889.5 LOT 14 1 I 3WO I f LOT 13 j 3879 LOT 12 i � � "� d 3889 I