Loading...
HomeMy WebLinkAbout3340 Yukon CourtCt. ao l _� 6 2 -71& INSPECTION RECORD INSPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/forms.aspx?fid=79 INSPECTION REQUEST LINE: (303) 234-5933 - Occupancy/Type /` c Inspections will not be performed unless this card is posted on the kr6ject site. **Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business d-4.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Initials Comments Pier Plumbing Concrete Encased Ground (CEG) ta SV' Foundation / P.E. Letter Do Not Pour Concrete Prior To Approval Of The Above Inspections Underground/Slab Inspections Date Inspector Comments Initials Electrical Wall Sheathing Sewer Service Plumbing Do Not Cover Underground or Below/In-Slab Work Prior To Approval Of The Above Inspections Rough Inspections Date Inspector Initials Comments Wall Sheathing Mid -Roof ta SV' Lath / Wall Tie Rough Electric' Rough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw / Nail Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing Final Mechanical Roof s% > Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. 'Tor low voltage permits — Please be sure that rough inspections are completed from the Fire District and electrical low voltage by the Building Division. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather i CITY OF WHEAT RIDGE Building Inspection Division j (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: )l o F Job Address: 0 Permit Number: <:�C)/ % ❑ No one available for inspection: Time 0 .30 AM/PM Re -Inspection required: Yes( No When corrections have been made, call for re -inspection at 303-234-5933 Date: 7' �L� % Inspector: DO NOT REMOVE THIS NOTICE � �_ i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection rtype: Job Address: 3 U o Permit Number: qtj 12 r C, 11 L2 �f �� <. ( L L ❑ No one available for inspection: Time AM/PM -Inspection required: SY No �71 wU ''When corrections have been made, call for re -inspection at 303-234-5933 Date: b c1 Inspector: 5V DO NOT REMOVE THIS NOTICE City of Wheat Ridge / Residential Roofing PERMIT - 201702716 PERMIT NO: 201702716 ISSUED: 06/27/2017 JOB ADDRESS: 3340 Yukon CT EXPIRES: 06/27/2018 JOB DESCRIPTION: Residential Re -roof to install Owens Corning Duration Storm asphalt shingles with 27 Sq. *** CONTACTS *** OWNER (615)429-4749 LICKING NICOLE J SUB (303)917-0628 Bob Schneider 160147 New Vision Roofing & Ext. *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 12,275.00 FEES Total Valuation 0.00 Use Tax 257.78 R.. Permit Fee 251.85 ** TOTAL ** 509.63 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding A�5-inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturera€'"s installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer&#39;s technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. PERMIT NO: JOB ADDRESS: JOB DESCRIPTION: City of Wheat Ridge Residential Roofing PERMIT - 2017027t6 201702716 3340 Yukon CT Residential Re -roof shingles with 27 Sq. ISSUED: 06/27/2017 EXPIRES: 06/27/2018 to install Owens Corning Duration Storm asphalt I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permrt. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date I . Thispermit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change, of the natural flow *of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable code or;any ordinance or regulation of this jurisdiction. Approval of work is subject to fyeId inspection. r" Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line. Dan Schultz G 2.7 ip From: no-reply@ci.wheatridge.co.us Sent: Thursday, June 15, 2017 1:00 AM To: Permits CommDev Subject: Online Form Submittal: Residential Roofing Permit Application Categories: Danny Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. Permits are currently being processed within 3-5 business days, subject to change based on volume. vjlG W-wV-r For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email 3340 YUKON CT. NICOLE LICKING 615-429-4749 NICOLEJL(@GMAIL.COM Address Do you have a signed Yes contract to reroof this property? It will need to be provided at the time of permit pick-up. CONTRACTOR INFORMATION Contractor Name Contractor's License Number (for the City of Wheat Ridge) Contractor Phone Number NEW VISION ROOFING & EXTERIORS 160147 3039170628 Contractor Email Address newvisionroof(EDgmail.com (permit pick-up instructions will be sent to this email) Retype Contractor Email newvisionroofCo)gmail.com Address DESCRIPTION OF WORK Are you re -decking the No roof? Description of Roofing OWENS CORNING DURATION STORM Material Select Type of Material: Asphalt If "Other" is selected Field not completed. above, describe here: How many squares of the 27 material selected above? Does any portion of the No property include a flat roof? If yes, how many squares Field not completed. on the flat roof? N TOTAL SQUARES of all roofing material for this project Provide additional detail here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) 27 l/ REROOF HOUSE AND ATTACHED GARAGE 8/12 Project Value (contract 12275.00 value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant Robert Schneider Email not displaying correctly? View it in your browser. 3 CUSTOMER AGREEMENT ACCREDITED BUSINESS Contingent upon Insurance approval BBB, New Vision Roofing & Exteriors LLC 7380 W. Calahan Ave, Lakewood, CO 80232 New -Vision -Roof!ng.Com 303-917-0628 Bob@New-Vision-Roofinq.com Licensed & Insured, BBB Accredited Property Owner Email Date JJ L /It'�et�a Street Address Estimator_` City, ST( ZIP Insurance Company Home Phone Work Phone Claim # • • • 4 Fuld Partial Repair {~ 1 Damage: 11-,,y s no Type: HOUSE GARAGE PATIO SHED SHED2 Roof Type: Drip Edge Color: Inspect Decking .%•Inspect Flashings lean Up & Remove Debris Payment Options mmm Full �fPartiaa Repair Damage: ye no Type: 4/1' • _ t)(!% ,C STUCCO VINYL WOOD OTHER: Style: Full 5" �R�es 6" —Cc Lf:� i4 I Color: Partial Repair mm. Alum. Steel i 4,+. Color: wrli Work to be completed according to the above specifications in the amount of: (not,to ipclude insurance supplements, permit costs or any unforeseen construction costs) Balance due upon completion ❑ Cash sale ! INSURANCE AGREEMENT. The homeowner authorizes New Vision Roofing & Exteriors to represent their best interest in pursuit of full replacement costs for damages believed to be covered under homeowner's insurance and allows New Vision Roofing & Exteriors to deal directly with the insurance company regarding this claim. This contract does not obligate the homeowner or New Vision Roofing & Exteriors until the claim is approved by the insurance company, and accepted by New Vision Roofing & Exteriors. Upon approval of claim, New Vision Roofing & Exteriors will complete all specified work at a price agreeable to the insurance company (RCV only) and New Vision Roofing & Exteriors, with no additional cost to the homeowner except for the deductible. You have the right to rescind this contract and obtain a refund of any deposit within 72 hours after entering contract. If you plan to use the proceeds of a property and casualty insurance policy to pay for roofing work, you may rescind this contract within 72 hours after you receive written notice from the property and casualty insurer that your claim has been denied in whole or in part. Final agreed upon price will become the final contract price, regardless of estimated contract price above. New Vision Roofing & Exteriors shall hold in trust any payment received from homeowner until roofing materials delivered at site or a majority of roofing work has been performed. I (We) agree, by signing below, to all contract conditions on both front and back, of this agreement. Homeowner's Signature: 1. 7 ;---'' Date of Acceptance: � Ar Homeowner's Signature: NVR Signature, ,Ilk, 1. If the property owner plans to use the proceeds of a property and casualty insurance policy pursuant to part 1 of article 4 of title 10, C.R.S., to pay for the roofing work, pursuant to section 6-2-105, the roofing contractor cannot pay, waive, rebate, or promise to pay, waive, or rebate all or part of any insurance deductible applicable to the insurance claim for payment for work on the covered residential property. 2. New Vision Roofing & Exteriors carries workers' compensation, automobile and commercial general liability insurance. A copy of the Certificates of Insurance may be obtained by calling insurance carrier, Colorado Insurance Professionals at 303-755-8600. 3. All Contracts subject to approval by New Vision Roofing & Exteriors LLC management. Contract price is valid for ninety (90) days. 4. New Vision Roofing & Exteriors reserves the right to perform specified work in accordance with generally accepted construction guidelines, while adhering to local codes in effect at the time of contract. 5. Our standard payment terms are fifty percent (50%) upon delivery of materials, and the remaining fifty percent (50%) upon completion of labor. All checks must be made payable to: New Vision Roofing & Exteriors. 6. All excess materials remain the property of New Vision Roofing & Exteriors. 7. Homeowner is responsible for Homeowner's Association approval of roofing products and colors. 8. Homeowner acknowledges New Vision Roofing & Exteriors as a general contractor; as such New Vision Roofing & Exteriors will be entitled to ten percent (10%) overhead, and ten percent (10%) profit, (O&P) if approved by the insurance company, as part of the claim. 9. An account is defined as past due when 30 days have elapsed from the date of completion of work. Past due accounts will earn interest at a rate of one and one-half percent (1.5%) per month or eighteen percent (18%) annually. If New Vision Roofing & Exteriors is required to turn the matter over to an attorney for collection, the homeowner also agrees to pay all costs incurred, including attorney's fees. 10. Should default of payment occur on this contract, New Vision Roofing & Exteriors reserves the right to place a mechanic's lien on the contract property. 11. New Vision Roofing & Exteriors shall not be held liable for failure of performance due to labor controversies, strike, fire, hail, weather, inability to obtain material from usual source, or any other circumstance beyond the control of the company. 12. Our standard workmanship warranty for roofing is five (5) years. 13. New Vision Roofing & Exteriors is not responsible for any leaks or water damage below the roof line caused by excessive wind, ice or hail during the period of the warranty. 14. You have the right to rescind this contract and obtain a refund of any deposit within 72 hours after entering contract. If you plan to use the proceeds of a property and casualty insurance policy to pay for roofing work, you may rescind this contract within 72 hours after you receive written notice from the property and casualty insurer that your claim has been denied in whole or in part. However, New Vision Roofing & Exteriors is entitled to retain payments or deposits to compensate New Vision Roofing & Exteriors for roofing work actually performed in a workmanlike manner consistent with standard industry roofing practices. New Vision Roofing & Exteriors cannot pay, waive, rebate, or promise to pay, waive or rebate all or part of any insurance deductible applicable to the insurance claim for payment of roofing work on your property. If this contract is cancelled by the homeowner, after 72 hours of execution, the customer agrees to pay New Vision Roofing & Exteriors twenty percent (20%) of the contract price, set by the insurance company, only if materials have been delivered or work has been performed, as liquidated damages. This payment is not a penalty, but is fair and just compensation for services rendered to that point. 15. New Vision Roofing & Exteriors will not be held responsible for slight scratching or denting of gutters, droplets of oil in the driveway, cracks in concrete, or damage to plants and trees. Furthermore, New Vision Roofing & Exteriors will not be held responsible for exterior damages such as deteriorated trim pieces, crown molding, stucco, solar panels, evaporative coolers, existing skylights, or interior damage such as falling dust and debris, cracked plaster, sheet rock or nail pops, as a result of normal re -roofing. 16. Replacement or repair of the deteriorated decking, fascia boards, swamp coolers, ventilators, chimneys, counter flashing, or any other work completed for the homeowner not explicitly stated in this contract, are not included in quoted price and will be charged as extra on a time and material basis. City of Wheatjdge COMMUNITY DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2846 F: 303.235.2857 DATE: February 6, 2017 TO: Accounting Department FROM: Meredith Reckert, Senior Planner SUBJECT: ESCROW REFUND/RELEASE Request for Release Reimbursement requested for funds for in the amount of $11,500.00 (Eleven thousand five hundred dollars and no cents) being held for landscaping for property located in the Yukon Grove Subdivision generally located at 32"d Avenue and Yukon Court. Please note that the requested amount was provided in separate payments submitted at various times for a total of $11,500 (see attached). The landscape improvements have been completed to the City of Wheat Ridge's satisfaction. MAKE PAYMENT TO: SEND TO: Yukon Grove, LLC Yukon Grove, LLC P.O. Box 102563 Denver, CO 80250 Meredith Reckert for Ken Johnstone Director of Community Development www.ci.w heatridge.com s Meredith Reckert From: Jackie Kowal <Jackie@nicholascustomhomes.com> Sent: Thursday, January 5, 2017 2:17 PM To: Meredith Reckert; Tammy Odean Subject: Escrow refunds for Yukon Grove Follow Up Flag: Follow up Flag Status: Flagged Hello Meredith, Could you please process the refund of the escrow for the following addresses. I believe they are all complete. 3320 Yukon (1500) •3350 Yukon (15 00) -3360 Yukon (1500) 3330 Yukon (1500) 3340 Yukon (15 00) 3351 Yukon (1500) 3205 Yukon (1000) 3341 Yukon (1500) Jackie Kowal Accounting Manager Nicholas Custom Homes Inc. Mailing address: PO Box 100068 Denver CO 80250 4201 E Yale Av, Unit B 13 5 Denver CO 80222 303-953-9525 ofc 303-828-8985 cell iackie(anicholascustomhomes.com invoicesnnichol ascustomhomes. com 1 A B C D E F G H I Landscaping Escrow Log AddressI 2 83 3869 Tabor Court Developer Stan Pac Date Received 2 52016 Amount 51000.40 Expiration Date 0601-2016 Amt. Released Released Date Remarks 84 3860 Tabor Court Stan Pac 02'12'2016 SL000.00 06'012016 85 10100 W. 38th Avenue ]4CG MominaStar 02192016 S 27.090.00 09'01'2016 S 27.090.00 08 03'2016 landscaping, arlan lot curb 86 3223 Jellison Biran-Morrison02252016 51.500.00 06'012016 s1.500.00 10132016 front vardlandsc in S7 5750,5760, 5780, 5790 W. 39 Incamation 02'25 2016 511,343.40 0601 '2016 512:833.00 1221-2016 landscaping around units 88 3869 Taft Stan Pac 03'18'2016 1 51:000.00 06'012016 front yard landscaping 89 7340 W. 44th Avenue BC Builders 03'182016 5 125.348.71 09012016 S 125348.75 05 272016 all landscaping 90 3440 Quail Court Quail Hollow- 04 04'2016 51,500.00 0,6012016 front yard landscaping 91 3225Yu1<onCourt Yukon Frove 05032016 51.500.00 06'01'2016 511500.00 09162016 front yard lands raping 92 3371 Yukon Court Yukon Grove. LLC O5 '03 2016 51,500.00 06012016 51:50000 09 16 2016 front yard landscaping 93 3321 Yukon Court Yukon Grove, LLC 04 122016 SI,500.00 06'01 `2016 S1.500.00 06 28°2016 front yard landscaping 94 3311 Yukon Court Yukon Grove, LLC 51,500.00 06 282016 landscaping 95 4110li ham William Powell 05 132016 1 51,000.00 06 30'2016 S 1000.00 0' 012016 front yard landscaping 96 3250 Iris Court Loumar Enterprises 05 27 2016 52,400.00 07 31 2016 front and side yard landscaping 9' 3391 Yukon Court 06'02'2016 51500.00 08 012016 $1.500.00 09 162016 front yard landscaping 98 InCamation InCamation 06092016 523.16;.00 09012016 523.16.00 12 -212016 trail desigan and construciton 99 3205 Iris Court Loumar 05 '312016 52,000.00 08312016 52,000.00 09 09'2016 [landscaping, - comer lot 100 3330 Yukon Corot / Yukon Grove, LLC 09'162016 51.500.00 10312016 101 3340 Yukon Court Yukon Grove, LLC 09'16'2016 51,500.00 10'31'2016 102 3341 Yukon Court Yukon Grove, LLC 09162016 51500.00 10312016 103 3331 Yukon Court Yukon Grove, LLC 06 30 2016 SI.50O.00 OS 012016 51,500.00 09 16 2016 104 3351 Yukon Court ^ Yukon Grove, LLC 10 712016 SI,500.00 04 30 201' 105 3350 Yukon Court- Yukon Grove. LLC 1102 2016 51.500.00 04 30 201' 106 3360 Yukon court ..— Yukon Grove. LLC 1102 2016 91,500.00 0.1'30 7017 107 3840 Tabor Court Stan Pac 11 16 2016 S1:000.00 04%30 2017 108 11305 W. 33rd Quail Hollow 11 '22 2016 550090 04 302017 front vard sod 109 11355 W. 33rd Quail Hollow- 1122'2016 5500.40 04 302017 front yard sod 110 3320 Yukon Court " Yukon Grove, LLC 11'232016 51,500.00 04 30'2017 front yard landscaping 111 3350 Quad Quad Hollow 1230'2016 5500.00 0430201' sod 112' 113 114 115 116 Meredith Reckert From: Jackie Kowal<jackie@nicholascustomhomes.com> Sent: Thursday, January 5, 2017 2:17 PM To: Meredith Reckert; Tammy Odean Subject: Escrow refunds for Yukon Grove Follow Up Flag: Follow up - Flag Status: Flagged Hello Meredith, Could you please process the refund of the escrow for the following addresses. I believe they are all complete. 3320 Yukon (1500) 3350 Yukon (15 00) •3360 Yukon (15 00) 3330 Yukon (1500) 3340 Yukon (1500) 3351 Yukon (1500) 3205 Yukon (1000) 3341 Yukon (1500) Jackie Kowal Accounting Manager Nicholas Custom Homes Inc. Mailing address: PO Box 100068 Denver CO 80250 4201 E Yale Av, Unit B 135 Denver CO 80222 303-953-9525 ofc 303-828-8985 cell i ackiena,nicholascustomhomes. com invoices &nicholascustomhomes.com 1 City of COML City of Wheat Ridge Municipal Building 7500 W. 29" Ave. January 23`d, 2017 Owner/Occupant 3340 Yukon Ct. Wheat Ridge, CO 80033 Wheat Ridge, CO 80033-8001 P: 303.235.2855 F: 303.237.8929 RE: Previously permitted project plans available for retrieval — Permit 201600310 (New Single Family Home) Owner/Occupant, This letter is being sent to you because a project for which a permit was issued by the City of Wheat Ridge Building Division and pians and/or other documents were required was recently completed and approved. In accordance with the Building Division's document retention policy, the associated plans and/or other documents are scheduled for disposal. We are writing to offer you an opportunity to retrieve those approved plans and/or documents prior to their disposal by the Building Division. The plans and/or documents are available for retrieval for a period of 20 working days (4 weeks) from the date of this letter and must be retrieved in person at the Building Division offices. This letter must be presented at the time of retrieval of the plans and/or documents. Plans and/or documents available for retrieval CANNOT be mailed and plans and/or documents will NOT be available for retrieval after the expiration of the retrieval period, which is 60 days from the date of this letter. You may retrieve plans and/or documents between the hours of 7:00 a.m. and 5:00 p.m., Monday through Friday, at the Building Division offices located at 7500 W. 29th Avenue in Wheat Ridge. Cordially, Melissa Mackey Senior Permit Technician 7500 W. 29th Avenue Office Phone: 303-235-287 Fax: 303-237-8929 City of heat l �e COAAA1UM,rY DEVELOPMENT w.ci.wheatridge.co.us CITY OF WHEAT RIDGE Building Inspection Division / (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax Inspection Type INSPECTION NOTICE Lei Job Address: 3 3 V 0 �( Lc Lo„, C -+- Permit Number: :)-01 IPU 1 -3:33 ❑ No one available for inspection: Time i � • 10 AM/PM Re -Inspection required: Yes 6D *When corrections have been made, call for re -inspection at 303-234-5933 Date: (- 3 —1"I Inspector: V-_ DO NOT REMOVE THIS NOTICE m A O O ro ro N m ro � x � O H m m u H m O H m N m m • • m ,C O Q N O ro 0 tnN -.a m b 0 W NU 7 A O b C '1 w O u N wy m O ° m a Op m i d rn m o O w ro u \/ O m .2c o H q m w al O m u m NU " x a 14 V Wp 3 a ° oQ ro A z 'n m N° H O 'a li C W m b 'a : �tn `\" �I 930 O N A 11 H N H jr�`J ro m U w 1 M m A m° u W � m � � m O a m a y i w o p 0 0 0 a m a •• 41 ro u m U H m + m O w JJ N 1 5 O -ri ro H C N y m �4 u u u m QI t H P. 0 M M 0 0 OI z 0 U 0 E- EO z 0 U O W a. mlaIa rn a b U a � m 0 N a Q S O G z u v a 0 a A �y o o 00 0 a M M a w rA C7 G1 W N4 a � O o a W w F a U o a a O U aa N P. ttl U 44 44 O Ol G'a ro ri W N •r{ U *tD L�Qo) C+- � L SDI U 0 W"),5 INSPECTION RECORD INSPECTION REQUEST LINE: (303) 234-5933 Occupancy/Type Inspections will not be performed unless this card is posted on the project site. Call the inspection request line before 11:59 p.m. to receive an inspection the following business day.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections I Date Inspector Comments Initials _ Pier _ Concrete Encased Ground (CEG) Foundation / P.E. Letter Do Not Pour Concrete Prior To Approval Of The Above Inspections Underground/Slab Inspections Date Inspector Comments Initials Electrical Comments _ Sewer Service Plumbing Do Not Cover Underground or Below/In-Slab Work Prior To Approval Of The Above Inspections Rough Inspections Date Inspector Initials Comments Wall Sheathing Mid -Roof Lath / Wall Tie Rough Electric " Rough Plumbing/Gas Line Rough Mechanical Rough Framing Insulation Drywall Screw /Nail Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept.Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing Final Mechanical Roof Final Window/Doors Final Building -�«I 7 NOTE. All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. *For low voltage permits — Please be sure that rough inspections are completed from the Fire District and electrical low voltage by the Building Division. **For Inspection Time Window Requests — Please email insptimereauest(aci.wheatridge.co.us by 8:00 A.M. the day of the inspection with the property address in the subject line of the email. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather w, �.1 CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Job Address: Permit Number: / s C- e ❑ No one available for inspection: Time AM/PM Re -Inspection required: Yes No *When corrections have been made, call for re -inspection at 303-234-5933 Date: Inspector: DSO NOT REMOVE THIS NOTICE & am pkwpwnbtu Building rt s w ars ": ez :: s . . bo* Sides of tWo form IncooWkft appy"tior* MW fwt be M M' t Mailing Addrom: (if ditrenf Man 1raperty ad dms Addr t CRY. ftte. zjn- 14 Con car: 741 Contractom CRY c> ucwm ,.'-�, Sub Contractcn.. w. r f s s r � A�w #R f r Std. F AF � We Ganoms Amps Squares r O"ER/CONTRACTOR SIGNATURE OF UNDERSTA"ING AND AGREEMENT ... ..#.. thatthesetbackdistances # ##-# # AthisPerinitapplicationare accurate a &.:.:: •A not # . applicable #.. 3 +':ww. is regulations #.the CityR Wheat . Ridge or accurate; that I have read and agree to abide by all conditions printed on this application and assume full responsibility for compliance with applicable City ofWleat Ridge codes and ordinances lbr work under any pennit issued based on this applicatiow, that I arn the legal owner or have been authorized by the legal owner of the property to perfbim the described work and am • lso authorized by the legal owner of any entity included on this applicati on this application. ad, N ;uiul " "viVl GRAPHIC SCALE V-10 10 20 30 M PROPOSED SPOT ELEYATION /V = FINISH ORADES t x,tatt+ttrt.. B T V��IIIIII Q .t f { 2 I to..00 a : 3 gg tl' uw '.. LINE OF FOUMOATiO AUGURED F WUM POST BASE AVSQRW PIOO'MNS C4KNEOTOM i4A+ �s It,Ml I i,31 PLAN .r s+ • � ar TING DETAIL mo Him I 0 8 L- enea+n. - +aw,w. .xynn, +xnuw - - 11.4 DosseylSudik STRUCTURAL ENGINEERS September 21, 2016 Yukon Grove, LLC Mr. Bob Nettleton P.O. Box 102563 Denver, CO 80250 RE: Structural Analysis Yukon Grove Subdivision Wheat Ridge, CO Plan A — Including the following addresses 3320, 3330, 3340, 3341, 3351, & 3360 Yukon Ct. Dear Mr. Nettleton; At your request, this office performed a structural analysis for the above listed residence. The purpose of the analysis was to review and provide recommendations for the conditions described below. The pertinent information regarding the analysis is as follows: POST CAP MODIFICATION It has come to the attention of this office that the front porch beam to post connection was modified to be a concealed connection. The two 4x8 beams were mitered over the 6x6 post. Leger loks were installed through the post and into each of the beams. Analysis by this office shows that the existing condition is structurally acceptable to support the applied loads. No modifications are required. Please contact our office if we may be of further assistance. Sincerely, �lI Iva0� Jamie Doerr Project Manager O�0O LlgF;-N s o ...o �' ' °O ss ;o 37653 4/ONA%- Dave Dossey, P.E. Principal 6025 S. Quebec St., Suite 375 Centennial, Colorado B01 11 303.996.0208 303.477.5680 �1 C DosseylSudik STRUCTURAL ENGINEERS September 21, 2016 Yukon Grove, LLC Mr. Bob Nettleton P.O. Box 102563 Denver, CO 80250 RE: Structural Analysis Yukon Grove Subdivision Wheat Ridge, CO Plan A — Including the following addresses 3320, 3330, 3340, 3341, 3351, & 3360 Yukon Ct. Dear Mr. Nettleton; At your request, this office performed a structural analysis for the above listed residence. The purpose of the analysis was to review and provide recommendations for the conditions described below. The pertinent information regarding the analysis is as follows: POST CAI' MODIFICATION It has come to the attention of this office that the front porch beam to post connection was modified to be a concealed connection. The two 4x8 beams were mitered over the 6x6 post. Leger loks were installed through the post and into each of the beams. Analysis by this office shows that the existing condition is structurally acceptable to support the applied loads. No modifications are required. Please contact our office if we may be of further assistance. Sincerely, Jamie Doerr Project Manager �00 LlCF'V o� s :4 37653 Dave Dossey, P.E. Principal W.. N At - 6025 S. Quebec St., Suite 375 Centennial, Colorado 80111 303.996.0208 303,477.5680 r -i O N N a) C) v Q 0 M 0 O r -I O N a) a W� r1 � o x 00 "O �U N �W 0 O Q O F I W K ID m o ro ;j ro F � ro N b m m m 4 M ID N m4 '1o H Ph ro q Id N o o a .a � o a q N N o v a A � tP b u C 44l mVm s pq O M A q U !J U O ro m b a o q y a v � ro N m m F H F' o m 7 3 O w u m N F u u m 0 m O m Z F � u o vO 3 U o ~ppq r N o v > 0 o a m m ro o o 0 m G m Q U n w o a m ° A H u x m o a a a v ro z a A m A F c mi m > U rz N w u 3 A m O L T m M q u N wo q O U v PG o w to yO o .wi o m o 9 a .. pC a m Ym W�A mm L� p' zg��s W �Qi vl rn N Z N M OU o m c > r 11,41 s u F w 4 b O 22 U o N ai a W W A 17 3 u tD a M a 'd U A O LOob � H a 44 U ai O `H Q� m E 7 W 44 A U 0 +� 3 A q ci u .� U U 0 A U w ri 4a r-1 41 (d to H O bi k 0 a .�i U z° N 0 ..) U nm Q1 m C H tn q .rl b P�0 44 m U 44 O y A $O U a Mb ro � V O U 41 w 0 a1 w 44 A � U d N N m N uw0 O 0 04 City of Wheat Ridge Single Family - New PERMIT - 201600310 PERMIT NO: 201600310 ISSUED: 03/31/2016 JOB ADDRESS: 3340 Yukon CT EXPIRES: 03/31/2017 JOB DESCRIPTION: New single family home -1263 sf with 512 sf basement finish. *** CONTACTS *** FEES Total Valuation OWNER (303)594-9145 YUKON GROVE LLC 611.08 Use Tax GC (303)598-4967 Robert L. Nettleton 150101 Nicholas Custom Homes, Inc. SUB (303)680-7484 Delmar Electrical 018323 Delmar Electrical Contractors SUB (303)287-1846 Joy Valentine 021169 Cool Sunshine Heating & A/C SUB (303)472-7074 Nathan Stickley 150262 Stickley Plumbing *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: / SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 215,689.00 FEES Total Valuation 0.00 Plan Review Fee 611.08 Use Tax 3,882.40 Permit Fee 1,880.25 Engin. Review Fee 150.00 ** TOTAL ** 6,523.73 *** COMMENTS *** *** CONDITIONS *** SH: Approved per plans and red -line notes on plans. Must comply with 2012 IRC, 2014 NEC and all applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections. MR: Prior to issuance of CO for individual homes, the following landscape improvements shall be installed in the front yard of each lot: one (1) 1.5" caliper deciduous or ornamental tree or one (l) 6-8' evergreen tree; eight (8) shrubs; 5' border of 1.25" river rock adjacent to the foundation; sod; and an automated irrigation system. As part of the foundation inspection and PRIOR to the first framing inspection, a completed, signed and sealed, Foundation Setback and Elevation Certification shall be submitted to the City for review. The certification form shall be fully completed by a Professional Land Surveyor licensed in the state of Colorado, stating that the foundation was constructed in compliance with all applicable minimum setback and elevation requirements of the City. Prior to project completion or granting of a Certificate of Occupancy, an As -Built Survey or Improvement Survey Plat shall be submitted to the City. RECORD JINSPECTION REQUEST LINE: 303 234-5933 Occupancy/Type Inspections will not be performed unless this card is posted on the project site. Call the inspection request line before 11:59 p.m. to receive an inspection the following business day. Inspector Must Sign ALL Spaces pertinent to this project Electrical (Underground) Foundation Inspections Date Inspector Initials Comments Sewer Service (Underground) Monolithic Slab Reinforcement Water Service (Underground) Caissons Plumbing (Below / In -slab)£ Concrete Encased Ground (CEG) - Heating (Below / In -slab) Footing/Stemwall P.E. Letter Final Building/Frame Do Not Pour Concrete Prior To ADDroval Of The Above Insnections Underground/Slab Inspections Date Inspector Initials Comments Electrical (Underground) - 9 -! 7. �� - E• �,�� mt 2 y" Q 1-4 Sewer Service (Underground) - -- j(' Water Service (Underground) -27•-/� Plumbing (Below / In -slab)£ - - Heating (Below / In -slab) Do Not Cover Underaround or Below/In-Slab Work Prior To ADDroval Of The Above inspections Rough Inspections Date Inspector Initials �—� Comments Wall Sheathing Roof Sheathing Lath / Wall Tie a / 6 Final Inspections Rough Electric Rough Plumbing Rough Mechanical LGas Piping 7. �� - E• �,�� Comments Do Not Proceed Without Awroval Of Above Rouah Insoections Rough Framing Insulation i j.� / (, Drywall Screw / Nail . 3" Final Inspections Date Inspector Initials Comments Final Electrical - -- j(' Final Plumbing -27•-/� Final Mechanical - 2 -7 -Roof Final Building/Frame iL Vic(` Landscaping & Parking ! Planning Dept. — q - Z-1 - �k' i= - Inspections from these entities should be requeste one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. 4,;7 /r Fire Inspection / Fire Protection Dist. "Note: All items must be completed and approved by Plar?ning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather V i CITY OF WHEAT RIDGE 91 Building Inspection Division �(303) (303) 234-5933 Inspection line 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 3 r Job Address: 33L(v y U <<O7y r Permit Number: 2 o/ G D o3 / U 10C t4i 11 6f fek .�74P ❑ No one available for inspection: Time / ��� M/PM Re -Inspection required: Yes *When corrections have been made, call for re -inspection at 303-234-5933 Date: Inspector: ) f7 DO NOT REMOVE THIS NOTICE rot%. uossey I Sud *1 k ST R U C T U R A L. E N G I N E E R S June 2, 2016 Nicholas Custom Hornes PO BOX 100068 Denver, CO 80250 RE: Footing and Foundation Wall Observations, 3340 Yukon Ct. Dear Mr, Nettleton; On April 26, 2016 a footing observation was performed and on May 3, 2016, a foundation wall observation was performed on the residence listed above, The applicable information concerning the observations is as follows: SPREAD FOOTINGFOUNDATION OBSERVATION — 2& 2016 The footing widths and depths were formed according to the contract documents. Property sized horizontal reinforcing was provided continuously in the forms. The reinforcing steel for the footings was properly lapped and tied and had been placed in the forms prior to concrete placement, Footing dowels were on site. Footing forms were placed on undisturbed natural soils and were clear of debris and loose soil. FOUNDATION WALL REINFORCING OBSERVATION — "rhe foundation walls height, thickness and reinforcing were formed according to the contract documents, Reinforcing was placed to provide adequate cover and was properly lapped and tied. The anchor bolts were on site and sized according to plan. The foundation forms were centered over the spread footing foundation system, Vertical dowels extended from the footing into the foundation wall at 24" on center. The foundation forms were clear of debris and loose soil. Please contact our office if we may be of` further assistance. Observation By: Bruce D. Kin 6025 S, Quebec St, Suite 375 Centennial, Colorado 80111 4/ Approved B 37653 Dave W. Dossey, RE, mm 303,9960208 30147T5680 11, ip-;i 'FIZZ Colorado Geoscience and Design Job. No. 15-394 CONSTRUCTION SITE ADDRES& 3340 Yukon Court Jefferson County Colorado OWNER/BUILDER NAME, ADDRESS- Yukon Grove LLC P.0, Box 102563 Denver, CO 80250 I/we hereby state that observations were made as indicated below and that the items observed were found to be in substantial compliance with the plans and specifications designed for this project and the site where it is constructed, Date Observed by: 4/25/2016 EXCAVATION OBSERVATION AC SOIL REPORT INFORMATION: COLORADO GEOSCIENCE AND DESIGN INC 15-394 NOT VALID WITHOUT ORIGINAL SIGNATURE iiiiiij 1116 I =0 0 m!] 0 mgm M # =* M M*#• - z •A 1w MM CONSTRUCTION SITE ADDRES& 3340 Yukon Court Lot #17 Yukon Grove Jefferson County OWNER/BUILDER NAME, ADDRESS: Yukon Grove LLC P.O. Box 102563 Denver, CO 80250 trat-a-rt-ecenTs t* 46 rn substantial compliance with the plans and specifications designed for this project and the site where it is constructed. Date Observed by: 5/14/2016 DRAIN & DAMPPROOFING AC SOIL REPORT INFORMATION: Colorado Geoscience & Design Inc. 15-394 Observations Reviewed by: 10, NOT VAI AD WITHOUT ORIGMAL SIGNATURE i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Job Address: 3,3,L D y t-4 (cc c -r Permit Number: 20 f 6 o0 3 010 q., /0 n ., : 20A ; to Ve't S C /Q i0 ❑ No one available for inspection: Time /PM Re -Inspection required: oesNo *When corrections have been made, call for re -inspection at 303-234-5933 Date: C) -Z7 Inspector DO NOT REMOVE THIS NOTICE A i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: t `/ i rvt r r , ?F / E i11 'Z Job Address: 33 -lo yU icoN c -t' Permit Number: 20/4 00 3 i b up`� It /avr+ i Pe P;�� 6�C I P S n �Pd ,%JOwP. y. C� ZP.p 4- e f e okr �•X 4,.r_ 6 -in, ew �L4M,'�_ r�<,� C/ I ulP l� c,r�oNf �v�Pi �2P�.(70or►� mtcl.un.ct �•^ti�'r) f •�t 5� fcAen F!C 4`i31-1 cl, .c I NPP 4 ol-1 ,1b %C tiJ sr ao X04 to '4e••�*�4,0� `� �rv�/,cit ,a e, c1 rri i .l I f� On n f 0 /l Gl Il' o.� P� c <c1 yr `�J4 !P ❑ No one available for inspection: Time /L2 AM/PM Re -Inspection required: DesNo *When corrections have been made, call for re -inspection at 303-234-5933 q 26-f 4 � Date: J Inspector: ct DO NOT REMOVE THIS NOTICE Mnon"NE1 , # U ILIM 10 l-Ily 01 W 11 flundrer ollars ana zero cents pX,,S4FU.V1frU ocingriclu yt e Ily landscMping is competed at KREMM In the event that front yard landscaping by October 31, 2016, the City of Wheat Ridge or its designee shall have the right to enter upon said property to construct and/or install such improvements or do other such work to accomplish that purpose as may be necessary, provided that the City of Wheat Ridge shall first give notice in writing to the property owner of its intent to do so. If the City of Wheat Ridge exercises its right to perform work of any nature, including labor, materials and use of equipment either by force account or contract, the City shall have the absolute right to withdraw the escrow funds to complete said improvements. The only precondition to the City's tight to withdraw the funds for this purpose shall be a letter from the Community Development Director, stating that the improvements have not been completed or provided and that the compliance date of October 31, 2016, has expired. Approved and Agreed: 1--o"Orat CAntrai-Mr. b Date Title M= I ME UIM- NO 1 By: Title: Date: M ts� 0 io 3 0 r+ CD CD p CJt 0 CJt Po 0 0 0 IR A 3 0 X 0 ts� 0 io 3 0 r+ tT4,,C cti CD CJt 0 Po 0 00 0 IR A 3 tT4,,C cti :. a.. hk"Jahted ... e „.. on both sidgm-offfis e: Property *_ Mailing Address: different property address) Plan Review fte.- QW, State, .. x far ngi , er E-mail: c i lei i Contractor.* Contractors City License 0 Phone: Contractor E-mail Address: Electrical: 4"7 _ W.R. {amity License # Other City Lice Sib. City License a Mechanical, f off, � %A s.AN 45�— W.R. City Li NEW COMMERCIAL STRUCTURE ELECTRICAL SERVICE UPGRADE EW RESIDENTIAL STRUCTURE COMMERCIAL ROOFING COMMERCIAL COMMERCIALRESDENTIAL ADDITION ACCESSORY r yy WINDOWREPLACEMENT f MECHANICALUCTURE (Garage, shed, dft*, etc.) RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) SYSTEM/APPLIANCE M dr# • 1R #Ilt o REPLACEMENT y /M # PLUMBING SYSTEM/APPLIANCE •MG# M • #Mr... or yyF M LACMENT ELECTRICAL _ # REPAIR 1y #AF REPLACEMENT e #1 # -OTHER (Describe)_______ 177, Sq. FULF Amps Squares Other Prelect V414O.- (Contract value or the cost of AlLmaterials and labor included in the Sam i • M IF * t t LRM B - x e • . # City of SINGLE FAAHLYIDUPLEX lf�R I ril I' W h6at P"�'Oge BUILDING PERMIT A PPLICA TION RE VIEW 'UBLIC WORKS Date: _VAPk___ Location: _ ?,a ATTENTION: BUILDING DIVISION I have reviewed the submitted application documents to construct a located at the above referenced address. Please note the comments checked below. Drainage: a, Drainage Letter & Plan required: —Yes No K Site drainage/grading plan have been reviewed and are: OK referto Public Improvements required & to be completed with project: stipulationr), a. street paving./patching: — Yes No — Completed b. curb & cutter: — Yes No — Completed c. sidewalk: — Yes No — Completed d, Other (specify): — Yes No — Completed For items not constructed, the amount of funds taken in lieu of construction: $ Does all existing roadway/alley R.O.W. meet the standards of the City: V_ Yes No If not, what is required? If R.O.W. is required, has the deed been received: Yes No (see Note below) NOTE: All deeds must be reviewed and approved prior to issuance of the Certificate of Occupancy. 4. -,V- ALP—ROVED: The Public Works Department has reviewed the submitted material and hereby approves this Permit Application, subject to the stated requirements and/or attached stipulations. irzcirrre Mark Van Nattan S. 1# NOT APPROVED: The Public Works Department has reviewed the submitted material and does not approve this Permit Application for the stated reasons}:____ Signature Mark Van Nattan 6. -L Stipulations: Em 7. --)1— A Drainage Certification Letter accompanied by As -Built plans from the Engineer -of -Record shall be required prior to the issuance of the Certificate of Occupancy. S. NOTE: ANY DAMAGE TO EXISTING PUBLIC IMPROVEMENTS AS A RESULTOF PROJECT CONSTRUCTION SHALL BE REPAIRED PER ROW CONSTRUCTION PERMIT PRIOR TO THE ISSUANCE OF TI -IE CERTIFICATE OF OCCUPANCY. --tPLJBLJC WORKS Cite of feat Ridge Municipal Building 7500 W,29"' Ave. 'heat Ridge, CO 80033-8001 P: 3€13,23 5,2861 F, 303,215Z57 Date. -A� Location of Construction: Purpose of Construction.- Commercial ons ct on. - n cal (Kequired ofall projects for document processing) multi -Family ly $50.00 :commercial Rvic °Fees» Review of existing or minimal technical documents, ---."... ... $2 $2KOO Initial review'of technical civil engineering documents (Fee includes reviews of the lea and 2nd submittals): . ......... .......... 600A0 Traffic Impact Study Review Fees (Fee includes reviews of the I" and d submittals):.. ......... $500.00 l Trip Generation Study Review Fee:... ........ 20().Otl 0 & M Manual Review & SIA Recording Fee- ..... .......... ......... 1001 ' Each Application will be reviewed by staff once and returned for changes, if after review of the second submittal changes have not been made to the civil documents or the Traffic Study as requested by staff, further reviews of the Application will be subject to the following Resubmittal Fees: '`'submittal (r', initial review fee):..,,: ......... ......... ........ ....:..:. $300.00 4`'' submittal (faoll initial review fee):.......... .... ... 6001 0 .All subsequent submittals: ........... ......... ......... .................. $600.00 (.Full initial review fee) TOTAL REVIEW FEES (due at time of Building Permit issuance): CiL� PLFASE NOTE THAT IN ADDITION TO THE ABOVE FEES, THERE WILL BE ADDITIONAI, LICENSINC, AND PFRMITTING FEES RFQUIRED FOR CONSTRUCTION OF IMPROVEMENTS WITHIN PUBLIC ragran.a AVhrgatridge.co,us "fyof' 1 3 9 l& i t t." W to It City of Wheat Ridge Municipal Building 7500 V 20 Ave. Wheat Midge, Co 80033-800 P: 303.235.2861 F: 3013.235.2857 NOTIFICATION FOR PUBLIC IMPROVEMENTS RESTORATION AT � ADDRESS: Dear Contractor: In conjunction with the approval of the building permit application for the above referenced address, this letter is to inform you that all existing public improvements located along the frontage of said address shall be restored, (if damaged from related construction) to an acceptable condition, as determined by City of Wheat Ridge public Works Department, and prior to the issuance of a Certificate of Occupancy. Prior to any constructi Rev. 00/2014 IffliflaROMM Mim, 11 1 Address: D Zoning: Lot Size: s (s ,0 sq. ft. Lot Width: Property in the flood plain's if yes, add suneying condition FID. Type of project (applicable survey conditions in parenthesis): Maximum Lot Coverage: �0 '74 % Existing Improvements: Proposed Improvements: House: sq. ft. Hause/addition: sq. ft. Shed: sq. ft. Shed: sq. ft Detached garage: sq ft, Detached Garage: sq. ft. Other: sq. ft. Other: sq. ft. Total Existing sq. ft Proposed Existing sq. ft Lot Coverage % Lot Coverage % Required Setbacks: FR S S R Provided Setbacks: FR _J ___�_ S I S S, Z' R For additions or new construction, is the structure within 2 feet of minimum setbacks? If yes, add suneying condition FND, Maximum Height: —,-,5--, ft. Maximum Size: sq. ft. Proposed Height: ft. Proposed Size: sq. ft. Parkland- If the permit is for new construction, have parkland dedication fees been paid? If no, add condition PFEE, notify owner, and notify building division, Streetscape: Does the permit result in any of the following conditions? Ll Construction of new roads Ll Platting of new lots Cl New development U Additions that increase floor area by 60% or more (see fortnula) (proposed floor area I,,,----.--,.,-- -- existing floor area-________) / existing floor area inc, If any box is checked.. . SF/DUPLE,X----- Is there existing U Curb U Gutter L15 -foot sidewalk adjacent to the property'? If curb, gutter or sidewalk is on issing, streetscape construction or fees -in -lieu will be required. MULTIFAMILY—Does the frontage meet current city standards? mm If not, strectscape construction or fees -in -lieu will be required. T-'ees-in-lieu oNedication or construction are clue at the time the permit is issued. Geoscience & Design, Inc. R0. Box 68 Franktown, Colorado 8o1i6 - Phone: 303.688.2150 - Fax: 303.688.1295 - CoGeoDesign SUBSURFACE INVESTIGATION ml I II lI I 'I I I I :III u 1111 1 111 1 1 WE TON JU1Y 23, 2015 po % 13 0 304 lot L NOT VALID WMiCIL7 0 RIGINAL SIGNATU, RE CrEOTECHNICAL STRUCFURAL CIVIL ENGINEERS General 1 Site Conditions 1 Field and Laboratory Investigation 1 Foundation Recommendations 2 Criteria for Concrete Slab on Grade Construction 3 Placement of Foundation Fill 5 Subsurface Drainage 5 Surface Drainage 6 Foundation Excavation 7 Radon Gas 7 General Information 7 Location Map Figure I Log of Test Holes Figure 2 Swell / Consolidation Charts Figure 3 Summary of Laboratory Testing Table I Details of Foundation Drain System Detail 1 Foundation Grading Detail Detail 2 Appendix Information about the Report Subsurface Investigation Yukon Grove, LLC Colorado Geoscience and DesLqn, Inc, Report No. 15-394 At the present time at the site is vacant. It is our understanding a single-family residence with a basement is planned for the site. The proposed structure will consist of wood framed construction with a steel reinforced concrete foundation, We anticipate the foundation loads to range from 1,000 to !!• per lineal foot of foundation wall. If the type of construction changes from that specified above, please contact this office for additional recommendations and/or requirements. Subsurface Investigation Yukon Grove, LLC Colorado Geoscience and Design, Inc, Report No15-394 ITUR 44V*4� Failure to follow the observation requirements noted herein may jeopardize the success of this construction project and shall absolve Colorado Gooscience, and Design Inc. from any and all responsibility for any damages arising from the failure to obtain proper site observations. Based on our evaluation of the subsurface conditions, we recommend the proposed single-family residence be founded on continuous concrete footings and pads. A professional engineer should use the following design criteria to design the foundations, MUM N Subsurface 9nvesfigafion Yukon Grove, LLC Colorado Geoscience and Design, inc, Repoft No, 15-394 is estimated that total structural settlement will be on the order of V and differential structural settlement will be on the order of Y2", Cracking of slabs -on -grade is difficult to control and should be expected to occur with time, Cracking may be the result of many factors such as concrete shrinkage and daily and seasonal variability in temperature and humidity and not necessarily the result of soil movement. Further, cracks and movement of slabs -on -grade can be transmitted through rigid floor coverings such as ceramic tile. Performance expectations should be taken into consideration in the selection of floor stab coverings. If floor coverings or coatings less permeable than the concrete slab are used, or if moisture is a concern, we recommend a vapor retarder be placed beneath the slab, Flooring installation should be consistent with the flooring manufacturer's recommendations for subsoil and stab construction and moisture testing prior to installation. Colorado Geoscience and Design recommends that steps be taken to re -du the possibility of intolerable concrete slab movement due to changes in water content, Properly landscaped yards, drainage from the foundation walls, and the installation of perimeter and/or under slab drainage systems are ways to mitigate changes in the water content of the indigenous soils (See "Surface Drainage"). M Subsurface Innes figation Yukon Grove, LLC CoWado Geoscience and Design, Inc, Report No, 15-394 Representative Percent Swell ,000 psf Surqhar 0 to <2 4 to <6 a Note� the representative percent swell values presented are not necessarily measured values" The swell potential of the indigenous soils for the residence at this site meet the criteria for low risk of slab -on -grade movement. Concrete slabs may be used for basement slabs, garage slabs and exterior surface (sidewalks, patios and aprons) placed on the native soil. Furthermore, intolerable movement of any slab on grade may occur at the site as a result of future factors beyond the control of Colorado Geoscience and Design, Inc. grade floor, the following steps shall be part of the concrete slab design: The soil should be kept moist but not wet during the compaction process as well as immediately prior to the placement of the concrete slab directly onto the soil. Steps shall be taken to ensure that subsurface moisture beneath the concrete slab remains constant during the construction process, 11 Subsurface Investigation Yukon Grove, LLC Colorado Geoscience and Design, Inc. Report No. 15-394 If a forced air furnace is Used, a 2" flexible connection should be installed between the furnace and the duct. Expgnsive soil is not suit,able for backfill material adjacent to the foundation The installation of an exterior foundation perimeter drainage system is required for any habitable space below grade level. See Perimeter Drain Detail 1, for a suggested method of installing this system, The perimeter drain shall discharge at a daylight location a minimum of 15 -feet away from the home. The daylight end shall have a screened end section to prevent rodents from entering the drain, Alternatively, the perimeter drain may discharge into a sump pit with a sump pump. if a sump pit is used, homeowners should perform routine observations of the sump pump system to make sure it remains in good working order. Failure to install and failure of a sump pump system can cause serious foundation problems, Water accumulation around Subsurface Investigation Yukon Grove, LLC Colorado Geoscience and Design, ine, Report No, 15-394 foundation elements is the major cause of foundation stress, therefore proper installation of the perimeter drain is very important. The backfill soil around the foundations should be moistened and well -compacted in 12 - inch maximum lifts with hand operated mechanical compaction equipment to prevent future settling, Controlled puddling of the backfill soils is not allowed. I Subsurface Investigation Yukon Grove, LLC Colorado oscience and Design, Inc, Report No. 15-394 Changes in site grading by landscapers or property owners can have damaging effects on foundations and concrete basement and garage slabs -on -grade. It is the property owner's responsibility to control water and maintain the site to prevent infiltration near foundations. Additionally, it is the property owner's responsibility to maintain downspouts and buried sprinkler system conduits. Precautions should be taken in deep excavations for safety of workers and to protect nearby structures. The sides of the temporary excavations should be sloped or benched at a 1/2H to 1V maximum rate, Spoils for the excavation should not be placed within 2 feet of the excavation sidewalls and the excavation should not be subject to excess vibration wetting or drying. The owner contractor should be familiar with the OSHA Safety and Health Standards for the Construction Industry, 29 CFR, Part 1926, or the appropriate foundation chapters of the International Building Code prior to construction. Most counties in Colorado have average radon levels (measured in homes) above the U.S. EPA recommended level of 4 PicoCuries per liter of air (pCi/1). Results of a 1987- 1988 EPA -supported radon study for Colorado indicated that granitic rocks, in particular, generally have elevated levels of uranium, Radon tends to accumulate in poorly ventilated areas below ground level, and can accumulate in above grade construction as well, Providing increased ventilation of basements and crawl spaces and sealing of the joints can mitigate build-up of radon gas. This mitigation is best implemented during the design and construction phase of the residence, The Colorado Geologic Survey and the U.S. EPA are both good sources for additional information regarding radon. Based on this subsurface investigation, the proposed foundations appear to be technically feasible to be constricted at the proposed site. The structures should be designed for construction in the direct vicinity of the boring location, If the proposed locations change, additional borings will be required to assess the soil conditions at the new location. Permitting work will be required to obtain any local and state approval, and design work will need to be performed by a qualified professional engineer to bring this project into final design, and subsequent construction. I Colorado Geoscience and Design', Inc. PROJECT� Subsurface Investioation JOB NO: 15-394 CUENT'. Yukon Grove, LLC Log of Test Holes LOCATION'3340 Yukon Court, Jefferson Cou2ty, Co[qrado_____ _ DRILLING METHOD: 4" Continuous Right Auger 100 El. 100 100— Clay, very sandy, stiff, A moist, brown - 9112C. 96— Fine-grained sand, clayey to very clayey, medium dense, dry to slightly moist, light brown x9112 —92 92— K M JR Uj M M MN E Is 88 d I _n 841 % 80 Um In Notes: Where Appiicabie­ 1, xly indicates that 'Y' number of blows of a 140 -pound hammer falling 30a- T indicates ground water encountered during the driffing inches are required to drivIn. Indicates ground water encountered after 24 hours. e a 2 -inch diameter sampler 'y" number of inches, 1 2, Indicates death at which soil samples were taken, c. Indicates auger refusal d indicates < 98= 100 300 im 3M 5M 10M 20,000 230000 APPLIED Test Hole No,1` Soil + 100 300 im 3M 5M 10M 20,000 23,000 APPLIED Test Hole No, Idie t ' Soil Qri tire: inti i t0 i i t0 iii ht! rr0it ii 0 100 300 im 3M 5M 10M 20,000 23,003 APPLIED( Test H th 4" Soil to h rrr 0 'mak: BOT" ;3,.RACE `41ALLS, I I I P,RiOR TO BACKFUJNG CXl)N,lCR.'.-.'fE GRI -,"DE BEAM F I LO(OR SLAEB EXPANSION JO�NT WELL SLOPED Io FT, MIN, rl 12 " PER DO NOT DIKE' li'41-i'll SOD OR EDC3ING" Tor" Oz� K—L-COMPACTE0 BACKFILL. ERATELY C0M..,PACTE-,-,D SACK ]Ll. 4" MIN, -Zl= NIPPROO'FiNG POi'-YETHYLENE CLUED TO WALL AND EXIENDED ALONG THEE BOTTOM OF THE EXCAVATION, 511 BUR-DiNG FEL. -F fr 3/4" TO 1 1/2" CLEAN GRAVEEL 4" UAMETER PERFORATED PiP.E, D M N PIPE 1/8" PER F001 10 ,�----q\�'--,-SLOPE 12" MiNDAYUGHT, OR TO A SUMP PIT, �F TO DAYLIGHT, COVER END WiTH SCREEN. BACKFILIL AROUND THE FOUNDATION Sll-iOULD BE MOISTENED AND COMPACTED AND THE FINAL GRADE SHOULD BE WELt ­ SLOPE"D TO PRECt-LIDE PONDING OF RAINFALL, IRR�GATION WATER, AND S),N�ow MfEll­ AD1,11AC'ENT TO FOUNDATION WALLS, CAUTION: DO NOT DIKE OR IMPEDE THE FLOW OF WAIER AWAY FROM FOUNDATION WALLS WITH SOD, I EDGING OR DECQRATAVE GRAVEL AND P0LYET+-,iYL,-vE.4-NE, DOWNSPOU'll-S AND SILL COCK'-' SHOULD DISCHARGE INTO SPLA& --i BLOCKS OR LON(".13 EXTENSIONS. DRAIN SYSTEM BELOW GRADE AND BACKFILL DETAILS (FOR FOOTING FOUNDATION) DEETAH- I I a I A C)UND,40-10N GRADING i")EIAHL- 9�6PE A VAY FROM FOUNDAT�ON. -,**------FOUND ATI ON WALL A NOTE: 1, PROVIDE A MINIMUM SLOPE OF 6" IN THE FIRST' 10'-0" FROM HOUSE (101%). 2, DOWNSPOUTS AND EXTENSIONS SHOULD EX T, __'N DED 5'-0" BEYOND T�lEE FOUNDA70N, m APPENDIX Important Infonnation about the Report The data collected by Colorado Geoscience & Design, Inc, during this investigation was used to provide geotechnical inforniation and recommendations regarding subsurface conditions on the site investigated, the effect of those conditions on the proposed construction, and the foundation type for the named client. The �r • Page I of 3 Table 1 presents the relative classification criteria for the percentage of expansion relative to the initial sample height, at the indicated surcharge pressure. Sivell Potential Chart FSAWATELL POT�ENTIAIL AT 1,000 LBS, CLASSIFICATION it to 0, on -e pansive ery low dx o 1 �,��% Low t .. �� l'�'z to r% Moderate �'z to ��°ar It gh 6 to 8% Very High �..�� Greater than % �_. critical The swell potential classifications are based on the percctitage of sell for samples placed on swell/consolidation machines under a surcharge of 1000 pounds per sego e foot. 'rhe relative swell classification can be correlated to potential slab damage as follows: Low - Mirror stab cracking, minor differential movement, and heave Moderate - lab cracking and differential movement, partial ftarning void and furnace plenum closure. High to eery High - large slab cracking and differential movement, closed voids, closed furnace plenum, and possible pipe rupture. These effects are based on monitoring and observation by several firms in the Denver er metropolitan area and are not limited to the relative swell classification, More or less damage can occur in all classifications because of the uncertainty associated with subsurface conditions mid geotechnical engineering. It is important to mote that measured smell or soil expansion is not the only geotechnical criteria for the type of floor and foundation recommendations. Additional criteria considered include: Soil and bedrock type and variability Stratigraphy Groundwater depth and anticipated post -construction moisture condition& Surface water drainage and features Post-constraction landscaping and irrigation Construction details and proposed use Local experience Page 2 of 3 Post -construction landscaping and owner maintenance will greatly affect structures on expansive scalls and bedrock. Typi ally, irrigated landscaping increases the sail moisture content above the pre -constructed water content. States, pavements, and structures significantly reduce vaporation of the seed moisture, Therefore, post- construction ast-constru tion heave and resulting da age to buildings and Cather improvements are likely to occur on sites with expansive stalls because oftl high probability that subsurface moisture content will increase h property and surrounding area is developed. poor owner maintenance, such as negative slopes adjacent to foundation walls and irrigated landscaping adjacent to the foundation, also will significantly increase the risk of damage from expansive scall and bedrock. The property owner, and anyone he or she plans to sell the property to, must understand the risks associated with construction in an expansive scan area and also must assume responsibility for maintenance of the structure. The € wner and prospective purchaser also should review "A Guideto Sivelling Soilsfor Colorado Homebuyers and Homeowners, " which is a special publication (SP 43) produced by the Colorado o Geol i al Survey to assist homeowners in reducing damage caused by swelling scalls, Page 3 of 3 SAVONA Maw 0 awn Om xi .. ,IM Xtl#Y4.ViTittl wlmmaumm W ., . A, • Report SEG 0216-025 - Page 2 DISCLAIMER 'rhe following pages summarize the heat gain and heat loss of the building using the ACCA Manual J8 calculation procedure. `Fhe calculations are based on the information given to Savoy Engineering Group in the form of drawings, sketches, and interviews. In certain cases, Savoy Engineering Group may make assumptions about design conditions that may or may not be accurate for the location of concern. It is the responsibility of the installing FIVAC contractor to verify the design conditions before equipment purchase and installation. Any load calculations provided in the following pages are based upon information provided by the party submitting a particular project to Savoy Engineering Group. Savoy Engineering Group has not and does not independently verify that the data provided to Savoy Engineering Group is correct or complete, and any calculations made by Savoy Engineering Group are based upon the information provided by third pat -ties. Savoy Engineering Group makes no claim that the information given to us is correct or complete. Savoy Engineering Group utilizes WrightSoft Residential 15.0 which is an RCCA Certified and ASHRAE recommended computer program to determine the heating and cooling loads presented in this report, and is therefore very accurate. If the information given to Savoy Engineering Group is accurate, and the building is built as per the plans submitted, then the load calculations presented in this report can be assumed to be accurate. A licensed mechanical contractor may use these calculations as a starting point in system sizing and selection. Savoy Engineering Group does not provide architectural or engineering plans or diagrams for the public or for use by contractors or construction companies as final "construction documents'. Savoy Engineering Group works with architectural and engineering firms and with contractors in connection with their designs of heating and air conditioning systems. If the FIVAC duct layout installed on-site DOES NOT match the Manual D duct design prepared by Savoy Engineering Group, then Savoy Engineering Group cannot and will not guarantee the performance of any altered duct design. Final HVAC sizing and selection should be done by a licensed HVAC contractor. Many factors beyond the scope of this report must be considered prior to final system selection and design, such as: exact equipment availability and selections, system controls and location of controls, system air distribution and cycling, Uniform Building Code requirements, Uniform Mechanical Code requirements., and many other standard design conventions as listed by the American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE). Savoy Engineering Group therefore assumes no liability for final equipment selection or final system design. Various modifications to the information provided to Savoy Engineering Group may have occurred after this Design Support information was prepared, which would require that this Design Support information be modified in order to be accurate. After reviewing Savoy Engineering Group's report, and prior to any system purchase or installation, please inform Savoy Engineering Group in writing of any changes which may alter the assumptions and calculations contained in this report. Report SEG 0216-025 — Page 3 lillipiql1l �j ! Report SEG 0216-025 — Page 4 MUZ ,ii � I ;! 111�11111 I III I I � 1111111 li�!1111 11111111!111 0 . ,* The Load Analysis includes 5 people (# of Bedrooms + 1) and a 1,200 Btuh appliance load M"° Report SEG 0216-026 — Page 5 ---- - - - ---- -- am��� • AC cooling equipment should be sized at 95-115% of Design Total Heat Gain, or the next nominal size that is available to satisfy the latent and sensible requirements. • Heat pump cooling equipment should be sized at 100-115% (cooling dominant climate) or 100-125% (heating dominant climate) of Design Total Heat Gain, or the next nominal size that is available to satisfy the latent and sensible requirements unless a larger size is dictated by the heating equipment selection. • Listed Output Heat Capacity must be sized at 100-140% of Design Total Heat Loss, or next nominal size unless a larger size is dictated by the cooling equipment selection. AED Assessment Entire House Savoy Engineering Group Phone: (801) 949-5337 Web: wVftload-calculatiOns,cOm IN on= For: Yukon Grove Plan A - Farmhouse Lot 17, 3340 Yukon Ct, Wheat Ridge, CO Location: Heating Denver Stapleton Intl AP, CO, US 72 Elevation: 5285 ft 79 Latitude, 40 ON 50 Outdoor: Heating Cooling Dry bulb (OF) -7 95 27 (H Daily range (OF) - Wet bulb (OF) - 59 Wind speed (mph) 15.0 7.5 indoor: Heating Indoor temperature (OF) 72 Design TD (T) 79 Relative humidity 50 Moisture difference (gr/lb) 67,6 Infiltration: MIMSIMESM Hour of Day Aeomi, / A-1.9. Maximum hourly glazing load exceeds average by 35.5%. q,,IAEiD�, based on AED limit of 30%. AED excursion: 376 Btuh (PFG 2016 -Feb -23 11:29:43 +wrlght$0ft Right -Suite OUniwrs-1201515.0,25RSU13868 Page I Yukon A FH Lot 171Yukon Plan A FH , Lot 17,rup Cato = W8 House Front faces: W Job Component Constructions Dat Seg e: Feb23, 201 5 'e - Entire House By: Tracy Savoy Savoy Engineering Group Y�teURx�t a..k g54,wwPa�lCFNa£xYeudwvxvrk �tlMNPo AP 8w4nLutysi; nia.4 a� : Phone(801)949-5337 Webmwfload-calcufafionsxorn 0.045 13.0 3,56 768 4 0 Project Information 0.059 13.0 4.75 For: Yukon Grove Plan A - Farmhouse 200 0.045 13.0 } 4 •Yukon Ct, Wheat Ridge, 0 0 29 (1.€159 Design C and tions 140 4.04 Location: 216 4.0145 Indoor: Heating Cooling Denver Stapleton Int'l AP, CO, US 62 Indoor temperature (OF) 72 75 Elevatiow 5285 ft 0.04 2 Design TD (OF) 79 20 + 40 *N Latitude.- 821 0 Relative humidity ♦ T Outdoor: 3.73 3798 4.41 5 419 Dry bulb -7 95 Infiltration: 4.75 313 Daily range ("F) - 27 ( H Me Simplified 0,75 Wet bulb (*F) - 59 Construction quality Tight 930 Wind speed (mph) 15,0 7.5 Fireplaces 0 155 Construction descriptions 0.75 Or 957 4.045 22.01 3.56 3402 4.75 715 Wal ES 15813_ c-10; Bg wall, heavy dry or light clamp soil, 2"x4" wood int frm, n concrete wall, r-13 cav ins, 8" thk, 1/2" gypsum board int fnsh n e e s s W all 114 ... 3 . :sspray. . ... J.... ... firm, 16" 'T I'MUM171 cav ins, 12"•sum board • t a. Windowsfnsh, 2"x6" wood firm, 16" o.c, stud ,A • .' } .. i I 216 0.045 13.0 3,56 768 4 0 62 0.059 13.0 4.75 234 4.04 2 200 0.045 13.0 3.56 712 0 0 29 (1.€159 13.0 4,75 140 4.04 1 216 4.0145 13.4 156 768 0 0 62 4.459 13.4 4.75 294 0.04 2 231 4.445 13.0 3.56 821 0 0 1017 0.445 13.0 3.73 3798 4.41 5 419 0.445 22.4 3,56 1488 4.75 313 85 0.045 22,4 3.56 301 0,75 63 262 (1.045 22.0 3.56 930 4,75 195 192 0.045 22.4 155 684 0.75 144 957 4.045 22.01 3.56 3402 4.75 715 61 4,677 110 6.08 374 0.92 56 91 0.077 13,0 6.118 556 0.92 84 31 0.077 13.0 6.48 187 0.92 28 184 0.077 13.0 6.08 1117 0.92 168 364 0.468 19.4 5.37 1955 0.70 255 n 43 4.344 0 26.9 1142 12.0 511 n 50 4.344 0 26.9 1343 12,0 601 e 20 4,344 0 26.9 537 32.3 646 S 66 4.344 0 26.9 1773 17.8 1176 s 20 0.340 0 26.9 537 17.6 356 w 40 0.340 0 26.9 1074 32.3 1291 w 25 0.340 0 26.9 672 32.3 807 all 264 0.340 0 26.9 7078 20,5 5389 n 49 0.340 0 26,9 1305 12.0 584 2016 -Feb -23 11 NA3 r O . Right-SuitOD Uni 4A5 -tow 2 glazing, cir low -e outr, air gas, vnlfrm mat, cir innr, 1/2" gap, w 1/4' thk; NFRC rated (SHGC--0,27); 5,5 Ti overhang (6 ft window ht, 2 It sep) Doors 11 DO: Door, wd sc type w Ceilings 16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 cell ins, 1/2" gypsum board int fnsh Floors 19A-30bstp: Part floor, r-30 ins, frm fir, 8" thkns, 1/2" gypsum board int frish 21A -20t: Bg floor, heavy dry or light damp soil, 3° depth 21A-32tBg floor, heavy dry or light damp soil, 30` depth 30 0.340 0 26,9 806 24,0 720 24 0,390 0 1293 0,020 %0 54 0.034 30.0 190 0.027 0 1071 0.020 0 30.8 749 10.8 263 1.58 2043 1,03 1327 225 121 0,57 31 213 405 0 0 1,58 1692 0 0 2016 -Feb -23 W29:43 wrlghtSOW Right -Suiten Universal 2015 15,0.25RSU`13868 Page 2 Yukon AFH Lot 17kYukon Plan A FH - Lot 17.rup Caro = MJ8 House Front faces: W Load Short Form t4) Savoy Engineering Grouvw Phow(801)949-5337 Webvvvmload-calculafions.corn 'reject Information For: Yukon Grove Plan A - Farmhouse Lot 17, 3340 Yukon Ct, Wheat Ridge, CO E* M M 0 # . # U= Design Information Htg C19 Infiltration Outside db (OF) -7 95 Method Simplified Inside db (OF) 72 75 Construction quality Tight Design TD ('F) 79 20 Fireplaces 0 Daily range - H Inside humidity 50 50 Moisture difference (gr/lb) 68 -45 11�W i� Make Trane Trade XB90 Model TUCIB060A9361A* AHRI ref 2008193 Make Trane Trade TRANE Cond 4TTR3024GI Coil 4TXCB03IBC3 AHRI ref 5593965 Efficiency 92.1 AFUE Efficiency 11.6 EER, 13.3 SEER Heating input 60000 Btuh Sensible cooling 20700 Btuh Heating output 56000 Btuh Latent cooling 2300 Btuh Temperature rise 63 OF Total cooling 23000 Btuh Actual air flow 986 cfm Actual air flow 900 cfm Air flow factor 0,037 cfm/Btuh Air flow factor 0.072 cfm/Btuh Static pressure 0.50 in H20 Static pressure 0.50 in H20 Space thermostat Load sensible heat ratio 1.00 ROOM NAME Area Htg load Clg load Htg AVF Cig AVF (ft") (Btuh) (Btuh) (cfm) (cfm) Master Bath 149 3212 1231 120 89 KWIC 41 0 0 0 0 Master Bedroom 186 2385 863 89 62 Bedroom 2 110 1408 528 53 38 CL 2 14 0 0 0 0 CL 3 13 0 0 0 0 Bed 3 / Study 110 1868 1613 70 117 DR/GR/KIT 516 6606 5328 247 385 Stairs 37 0 0 0 0 PNT 9 0 0 0 0 LND 8 0 0 0 0 Bath 44 934 599 35 43 Linen 8 0 0 0 0 Crawlspace 190 1140 6 43 0 Mechanicals 416 3461 512 129 37 Bedroom 4 191 2880 1423 108 103 Calculations approved by RCCA to meet all requirements of Manual J 8th Ed, 2016 -Feb -23 11:29:43 wrightSOW Right -S.4.0 Universal 2015 15A25 RSU13868 Page I x Yukon AFH Lot 17XYukon Plan A FH - Lot 17.rup Calc = MJ8 House Front faces: W CL 4 25 0 0 0 0 Bath 2 52 414 0 15 Laundry 48 0 0 0 0 Stairs 2 44 0 0 0 0 RSC Room 296 2079 346 78 25 G.Stair 18 0 0 0 0 Entire Mouse d 2522 26386 12449 986 900 Other equip loads 6485 1642 Equip, @ 1.00 RSM 14090 Latent cooling 0 TOTALS 2522 32871 14090 986 900 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2018 -Feb -23 11:29:43 WrightSi0ft Right -suites) Universal 2015 15.0.25 RSU13M Page 2 .,. Yukon A FH Lot 17\Yukon Plan A FH -trot 17.rup Unto = MJ8 douse Front faces: Job: SEG 0216-025 Right -JO Worksheet irate: Tracy Feb.3206 23,206 Entire Hoose By: Savoy Engineering Croup Phone: (801) 949-5337 Web: load -calculations core Master Bath Entire Nouse 22.0 ft 1 Room name 310.4 ft d 91 ftheat/coot 2 Exposed wait 8.6 If 1.0 x 148.8 ft 3 Room height 148,8 ft' 4 Room dimensions 2521.7 ft' Load 5 Room areaGoad Area (ft') Stuhj Ty number Area (ft'} or perimeter (ft) numbeact°sora U -value Or NiM or perimeter (ft) (Btuh) nr (Stuhift'-"F) (Btuhfft'} Neat Goof Gross NIP/6 Neat Goof Gross N6Pf5 Coot Neat €s 01 0 • •• 75 376 entilation 2682 1127. 24472. Less external a Less transfer Redistribution 253 Subtotal 1915 Duct loads 7 Total room load 0 Air required (cfm)_ 01 0 • •• 75 376 2682 1127. 24472. 5834 253 3 1915 264 0 0 0 0 0 5 1150 0 0 Occupants @a 230 1200 Applianceslother 2935: 1162 26386 12449 0 0 0 0 3212 1231!, 26386 12449 -0%0° 0 0 �q f� 000 0% 4 3212 1231 26386' 52449 120 89 VI r7m 7AM Entire House --, 1-1 0.. AqI7 W,h, .—in—i—i-dnfinnq 4 nm By: Tracy Savoy 42MIMAW, W Im-mm I —I,-- 2016 -Feb -23 11:29A3 WrIghtSOft' Right-SudeO Universal 2015 15A25 RSU13868 Page 2 �.kon AFH Lot MYUkon Plan A FH - Lot 17.rup Cale = W8 House Front f&�es� W `a.E'a2Ya "rva,masut'�a,�:nelms� t2. Phnnp.- fftnil 949-5337 Web. .load-catcutat'sons.corn ..' a i.. 2016 -Feb -23 11:29A317\Yukon Plan A FH - Lot ITrup Cale - W8 HouSe Front faceS� W Page 3 6MM; jj= to By: Tracy Savoy 2016 -Feb -23 W29:43 WrlghtOOft' Right-Suiteg Universal 2015 15,0.25 RSU13868 Page 4 ... Yukon A FH Lot 17XYukon Plan A FH - Lot 17.rup Cale = MJ8 House Front faces� W Entire House Pump, IAAII 949.53'47 Web. vAm.load-calculations,Com By: Tracy Savoy 2016 -Feb -23 W29 414- • Right-SuiteO Universal 201515,0,25 RSU13868 pag A&I, _Yukon AFH Lot Vftkon Plan A FH -Lot 17,rup Catc-W8 House Front faces: W i Job; SEG 0216-025 Right -M Worksheet Date: Feb. 23, 2016 Entire House Sy: Tracy Savoy Savoy Engineering Group calculations a roved by ACCA to meet all requirements of Manual J 8th Ed, A - - 2016 -Feb -23 11:29:43 WrI9ht9OfI,_ Right-Suit.V Universal 2015 15A25 RSU13868 Page 6 -Yukon AFH Lot 17'kYukon Plan A FH -Lot 17,rup Calc=MJ8 House Front facm W Job: SEG 0216-025 Date: Feb. 23, 20 By: Tracy Savol Ualcil 2016 -Feb -2311:29A3 VVr19ht9Oft* Righl Universal 2015 15,0.25 RSU13868 Page 7 Aft, ,, Yukon A F H Lot 17\Yukon Plan A FH - Lot 17.rup Calc = W8 House Front fates: W Job: SEG 0216-025 Right -j@ Worksheet Dace. Feb. 23, 2016 i moi, x Entire House By: Tracy Savoy Alp Savoy Engineering Group Calculatio �(ACCAto meet all mii')uirements of Manual, J 8th Ed �111 I= 2016 -Feb -23 W29 +"2015 15A25 . Peg House Right -JO Worksheet Entire House lQMA OAA-r'VA7 Wah- —i—i-nalridAfinn.q nom By: Tracy Savoy 0 2016 -Fob -23 11 � 29 IqhtOCwW Right-Suiteg Universal 2015 15,0,25 RSU13868 Pa A%k 17r — 7k., AFH Lot 17\Yukon PlanA FH - Lot 17,rup Cato - W8 House Front faces: W Job; SEG 4216-02 Right -JO Worksheet pate: Feb. 2a, 2416 iltire House By: Tracy Savoy S,mys t^"Iz- e vs 4 as 1) Savoy Engineering Croup -4*- WrIghtOOft' Right-Sufteg Universal 2015 15,0,25 RSU13W I Yukon AFH Lot 17\yuk- Plan A FH Lot 17.rup Catc . W8 House Front facm W Right -JO Worksheet Entire House • V -. v . " phren-tAnIIQAO,S'.VA7 Web,wv toad-calcutafionsxorn 2016 -Feb -23 11:29: Right-SuiteOa Universal 2015 15A25 RSU13868 wrightsaft, Page A&k ,, Yukon AFH Lot IAYukon Plan A FH - Lot 17.rup Calc = W8 House Front faces� W I Job: SEG 0216-026 Right -M) Worksheet Date: Feb. 23, 2016 By: Tracy Savoy Entire House Savoy Engineering Group 444- wrightgOfr Riqht�SURKWP Universat 2015 15,0,25 RSU138613 A&, �, Yukon AFH Lot 17\YuXon PlanA FH - Lot 17.rup Calc - MJ8 f40use Front faces: W Project Summary Entire House P Savoy Engineering Gro Phone.. (801) 949-5337 Web: wwload-calcutatiOns-COM wwwwwoux"Wan"M For: Yukon Grove Plan A - Farmhouse Lot 17, 3340 Yukon Ct, Wheat Ridge, CO Notes: Joy Valentine Coot Sunshine Heating &Air Conditioning, Inc Weather: Denver Stapleton InVIAR CO, US outside db -7 OF Inside db 72 79 OF OF Design TD 0,11 0.06 15 Heating Summary 27 Structure 26386 Btuh Ducts Central vent (91 cfm) 0 6485 Btuh Btuh Humidification 0 Btuh Piping 0 Btuh Equipment load 32871 Btuh Method Simplified Construction quality Tight Fireplaces 0 i o FEW&. C m Summer Design Conditions Heatin Coolin Area (ft') Volume (ft') 2521 14598 2521 14598 Air changes/hour 0,11 0.06 15 Equiv. AVF (cfm) 27 i o FEW&. C m Summer Design Conditions Outside db 95 OF 75 OF Inside db Design TD 20 OF Daily range Relative humidity H 50 % Moisture difference -45 gr/lb Structure 12449 0 Btuh Btuh Ducts Central vent (91 cfm) 1642 Btuh Blower 0 Btuh Use manufacturer's data y Rate/swing multiplier Equipment sensible load 1,00 14090 Btuh Latent Cooling Equipment Load Sizing Structure 629 0 Btuh Btuh Ducts Central vent (91 cfm) -2304 Btuh Equipment latent load 0 Btuh Equipment total load 14090 Btuh Req. total capacity at 0.90 SHR 1.3 ton Cooling Equipment Summary Ils- iy -MME 2016 -Feb -23 11�29M ryw Wr1ghtS0ft* Right -SuiteO Universal 2015 15A25 RSU13868 Page I I Yukon A PH Lot 17XYukon Plan A F H - Lot 17,rup Cale . Wa House Front faces� W Job: SEG 0216-025 Manual S Compliance Report Date. Feb, 23, 2016 Entire House By: Tracy Savoy Ss�,()N 1 (1 CMA[) Savoy Engineering Group Phone: (801) 949-5337 Web: vhminad-calculations.corn Outdoor design DB: 95.00F Outdoor design WB: 59-OOF Indoor design is" +V Indoor RH: 50% IN I W 11 0 lint a - I Sensible gain: 14090 Btuh II Latent gain: 0 B► tuh Total gain: 14090 Btuh Estimated airflow: 900 cfm Equipment type: Gas furnace Manufacturer: Trane Model: TUCI B060A9361 A* Actual airflow: 986 cfm Temp, rise: 50 OF Output capacity: 56000 Btu h 170% of load 2016 -Feb -23 11:29:55 r* €7 Right-SufteO Universal 2015 95,0.25 RSU13868 Page I ... Yukon AFH Lot MYukon PlanA FH - Lot 17 rup Calc = MJ8 House Front faces: W eat ng qu pment Design Conditions Outdoor design DB� -7VF Heat loss: 32871 Btuh Entering coil DB: 64.6'F Indoor design DB, 72,0'F Equipment type: Gas furnace Manufacturer: Trane Model: TUCI B060A9361 A* Actual airflow: 986 cfm Temp, rise: 50 OF Output capacity: 56000 Btu h 170% of load 2016 -Feb -23 11:29:55 r* €7 Right-SufteO Universal 2015 95,0.25 RSU13868 Page I ... Yukon AFH Lot MYukon PlanA FH - Lot 17 rup Calc = MJ8 House Front faces: W Trunk Grill Ht Clg TEL Design V loc Diam Hx Stud/Joist Quct Opening (in) Matl Trunk Jame Size (in) (cfm) (cfm) () FFR (fpm) (in) (in) 582 rb2 Ox 0 373 165 121.5 0.084 475 12.0 Ox 0 ShMt rt1 ShMt rt rb4 Ox 0 209 151 94.5 0.109 599 8.0 ' Ox 0 0 ShMt rb1 Oxo 404 583 65.0 0,158 546 14,0 Ox Trunk Htg Clg Design Veloc Diam H x W (in) Duct Material Trunk Name Type (cfm) (cfm) Fl; (fpm) (in) rt1 Peak AVF 582 317 0.084 544 14,0 0 x 0 0 ShtMetl ShtMetl rt1 rt2 Peak AVF 209 151 0,109 599 8.0 0 x 2016 -Feb -2 11:29:55 rRight-Suites universal 2015 15 0.25 RSU13868 Page 2 .... Yukon AFH Lot 17\Yukon Plan A FH- Lot 17.rup Catc = MA House Front faces: W Job M SEG 0216-025 Fvz-d4riirall�y Tracy Sav,#ry-ftm Yukon Grove Plan A - Farmhouse Lot 17, 3340 Yukon Ct Meat Ridge, CO Phone: (801) 949-5337 Wj,L-A!d2 �i7 �= * W -CAM Scale: 1 :81 Page I Right-SufteO Universal 2015 15,0,25 RSU13868 2016 -Feb -23 11:31�09 17\Yukon Plan A FH - Lot 17,rup 0 Job #: SEG 0216-025 ?te-Oft.,riyal ky Yukon Grove Plan A- Farmhouse Lot 17, 3340 Yukon Ct Wheat Ridge, CO Phone: (801) 949-5337 MWIT4046 Scale: 1 '81 Page 2 Right-SufteO Universal 2015 15,0-25 RSU13868 2016 -Feb -23 W31:09 17kYukon PjanAFH - Lot 17,rup "m kWTM 16-1/4' 2" DIAMETER 5/8" OUTSIDE AIR 1 , 7/8'DIA. HOLES ELECTRICAL CONNECTION 1-112'DIA. HOLE GAS CONNECTION m Upflow / Horitontal Condensing Gas Furnac Single Stage 28-1/2" I- TUC1 B060A9361 A f/2" � _ 2'DIAMETER FLUE CONNECT 1-718" X "718" SLOT K.0, (FOR H CONNSATONTAL)E DRAIN 7 DEORIZ 7/8" DIA, K.Q. TUC1B060A9361A F♦HIGH - Black 1394 1359 l 1/2" ELECTRICAL SUPPLY 945 843 3 - MED,-J±GH---BA&— 1 1232 (ALTERNATE) 28-1/4" 873 771 7!8" DIA. K.O. ELECTRICAL 1092 4 SUPPLY (ALTERNATE) 668 WA, M10 IBM 957 944 686 1-5/8" I CFM VS. TEMPERATURE RISE 1-1/2" DW . ..... ..... ...... KOGAS CONNECTION 20,1/4" (ALTERNATE) 22-1/2' > U� C14 Lo 1-1/8"DIAK0, CONDENSATE DRAIN - Alternates ?4-1/32" 5" 7/v T 71 1-718" X "718" SLOT K.0, (FOR H CONNSATONTAL)E DRAIN 7 DEORIZ TUC1B060A9361A F♦HIGH - Black 1394 1359 l 945 843 3 - MED,-J±GH---BA&— 1 1232 873 771 2 - MED. -LOW - Yellow 1102 1092 766 668 WA, M10 IBM 957 944 686 614 I CFM VS. TEMPERATURE RISE . ..... ..... ...... Cubic Feet Per Minute (CF M) TYPE Ugflovv / Horizontal RATINGS input BTUH 60,000 Capacity BTUH (ICS) (D 56,000 AFUE 92,0 Temp. rise (Min.-Max.j'F, 30-60 BLOWER DRIVE DIRECT Diameter -Width (In,) 10x7 No. Used I Speeds (No.) 4 CFM vs, in. w.g. See Fan Performance Motor HP 1/3 R.P.P. 1075 Votts/Ph/Hz 115/1/60 COMBUSTION FAN - Type _--centrifugal Drive - No. Speeds Direct - I Motor HP - RPM 1/55-3000 VoWPh/Hz 115/1/60 F.L. Amps 1.0 FILTER — Furnished? No Type Recommended High Velocity Hi Vel. (No.-Size-Thk,) I - 17x25 - I in. VENT COLLAR — Size (in.) 2 Round HEAT ffX5F1XN_dM�_ Type -Fired Alum. Steel -Unfired GaLto AFired), 20 6§41151d aln Nat.Gas, QD611 Size 3-45 L.P. Gas City. — Drift Size 3-56 iFILOT SATUY• Tr_t_ Hot Surepelgirtiticin_­_ 9 UANERS — y Number 3 -1-widi VCii WV/P;h17H_z'0D I Ampacity (in Amps) 8A (rent-Pr I — MAyii!6uw6mmmwi , �,�_w DIMENSIONS HxWxD Crated (in.) 41- 314 X 19-1/2 x 30-1/2 -Uncrated Lin,) WEIGHT Shipping (Lbs.) Net (Los) 150/140 0 Central Furnace heating designs are certified by the American Gas Association Inc. Laboratories, rate of 4% for eaCh 1000 feet above sea level. @Base 0 U.S. Government Standard Tests. (D The above wiring specifications are in accordance with National Electrical Code; however, installations must comply with local codes. NATURAILGAS MODELS—Central heat- BURNERS — Multi -port, in -shot burners STYLING — Heavy gauge steel and ing furnace designs are certified by the will give years of quiet and efficient service. "wraparound" cabinet construction is American Gas Association for both natu- All models can be converted to L.P. gas used in the cabinet with baked -on enamel ral and L.P. gas. Limit setting and rating without changing burners. finish for strength and beauty, The heat of the cabinet is com- iqwpy der standard rating conditions using Am can National Standards Institute standards, SAFE OPERATION — The Integrated System Control has solid state devices, which continuously monitor for presence of flame, when the system is in the heating mode of operation. Slow opening, dual solenoid combination gas valve and regu- lator provide extra safety and quieter op- eration. qUW0kTW_T heavy gauge aluminized steel heat ex- Anur t# the structure g jjeij� power vent outside. Since Trans has a policyrifoonfinuousproduro and product data improvement, it reservesthe right tochange specifica- icinsand designwohout notice. Trane A business of American Standard Companies www,trane.com v blowers, gas valve, flame contro, and in- fr)r E,A.C./humidifier. W010 f,#TII#7f- range for most heating and cooling re- quirements, will switch from heating to cooling speeds on demand from room it te, mostat, The blower door safety switch when the blower door is removed. (Fan dard). pletely lined with fofl-faced fiberglass insu- lation. This results in quiet and efficient operation due to the excellent acoustical and insulating qualities of fiberglass. FEATURES AND GENERAL OPERA- TION — These High Efficiency, Direct "171 Mitt `l`*1777ir ;wr the room thermostat. Complete front ser- vice access. Low energy power venter. b, Vent proving differential switch. htips:llwww.coinfortsite,cOinlEBiz.,'ApplicationlprodtictitifolPerfornianc,,. Performance Data Cooling ffim 4/23/2015 High Speed ---U.S. (English) Capacities are net in Stuh/1000 - indoor fan heat deducted Outdoor Model 4TTR3024G1 Indoor Model 4TXCB031BC3 ARIREF 5593965 Airflow 800 Total Net Capacity 23000 Btuh Airflow 800 CFM Compressor Power 1580 watts indoor Fan Power 292 watts Outdoor Fan Power 128 watts SEER 1125 Correction Factors - Other Airflow 59 17.50 Airflow 700 900 Total Capacity 0,98 1.02 Sensible Capacity 0,93 1.07 Compressor Kw 0,99 101 Rated with 25 Feet s/8 suction 3/8 liquid lines O.D.D.S. I.D.W.B. TOTAL CAPACITY SENSIBLE CAPACITY SYSTEM 72 75 1 7S I i5 Kw 85 59 17.50 19�60] L16A0 21.70 22-10 1 1 1.87 85 63 23.50 2350 1430 18�50 19.90 -- 1,88 85 67 .."�2250 25,20 11,40 13,50 15.60 17'00 1,90 95 59 20;.50 5 16,60 E 20.50 20�50 M 1.96 95 63 JO �50 21 0 13.50 17,70 19.10 1.98 9 5 67 2100 10,50 12.60 14.70 16A0 2.00 105 63 19,50 12,70 14,80 16.90 1830 2,08 105 67 20,80 930 11.80 13,90 15.30 2.10 105 71 22,60 6,90 9,00 11,10 12.40 2.12 115 63 17.50 11.90 14.00 16.10 17,50 2.18 115 67 1830 9,00 11,10 13,20 14.50 2.20 115 71 20,30 6.10 8,20 1030 11.70 2.22 Ca 2050 IDDB= 75.00 1830 1.96 Vj Performance at selected design conditions Dry coil condition (Total Capacity = Sensible Capacity) Total capacity, compressor Kw and app. dew point valid only for wetcoil All temperatures in Degree F C"�.-Aack 4/23/2015 8:33 AM I of 1 City of i jige CO MMUNITY DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033 -8001 P: 303.235.2846 F: 303.235.2857 March 25, 2015 OFFICIAL ADDRESS NOTIFICATION NOTIFICATION is hereby given that the following address has been assigned to the property /properties as indicated below: PROPERTY OWNER(S): Bill Fritz NEW ADDRESS: Wheat Ridge, CO 80033 Lot 1— 3205 Yukon Ct. Lot 2 — 3225 Yukon Ct. Lot 3 — 3245 Yukon Ct. Lot 4 — 3265 Yukon Ct. Lot 5 — 3285 Yukon Ct. Lot 6 — 3295 Yukon Ct. Lot 7 — 3311 Yukon Ct. Lot 8 — 3321 Yukon Ct. Lot 9 — 3331 Yukon Ct. Lot 10 — 3341 Yukon Ct. Lot 11 — 3351 Yukon Ct. Lot 12 — 3361 Yukon Ct. Lot 13 — 3371 Yukon Ct. Lot 14 — 3391 Yukon Ct. Lot 15 — 3360 Yukon Ct. Lot 16 — 3350 Yukon Ct. Lot 17 — 3340 Yukon Ct. Lot 18 — 3330 Yukon Ct. Lot 19 — 3320 Yukon Ct. Lot 20 — 3300 Yukon Ct. SUBDIVISION: Yukon Grove Subdivision, Filing No. 1 Jefferson County Reception Number for Plat: 2015016465 (See attachment) NOTES This is a courtesy notification. AUTHORIZED BY: I DATE: DISTRIBUTION: 1. Property Owner 2. Jefferson County Assessor, ATTN: Data Control, 100 Jefferson County Parkway, Golden, 80419 3. Jefferson County Mapping, ATTN: Addressing, 100 Jefferson County Parkway, Golden, 80419 4. Jefferson County Elections, ATTN: H. Roth, 3500 Illinois Ave., Laramie Building, Suite 1100, Golden, CO 80401 5. Email to Jeffco IT Services at smitchel@jeffco.us 6. U.S. Post Office, 4210 Wadsworth Blvd., Wheat Ridge, CO 80033 7. Email to erlinda i.martinezna,usps.g and krissy.j.summerfield(a)usps. ov 8. Xcel Energy, ATTN: Correspondence, 1123 W. 3rd Ave., Denver, CO 80223 www.ci.wheatridge.co.us 9. Century Link, Capacity Provisioning Specialist, 5325 Zuni St., Room 728, Denver, CO 80221 10. Comcast, Attn: Scott Moore, 6850 S. Tucson Way, Englewood, CO 80112 11. Consolidated Mutual Water District 12. Wheat Ridge Sanitation District 13. Wheat Ridge Fire District 14. Wheat Ridge Planning Division 15. Wheat Ridge Building Division 16. Wheat Ridge Police Department 17. GIS Specialist 18. Log File NOTE: Please notify all other parties concerned. ADDRESS MAP UPDATED BY: Vicinity Map DATE: A rd I M YUKON GROVE SUBDIVISION, FILING NO. 1 A PARCEL OF LAND LOCATED IN THE NW 1/4 OF SECTION 26, T.3S., R.69W., OF THE 6TH PM CITY OFWHEAT RIDGE, COUNTY OFJEFFERSON, STATE OF COLORADO I SHEET 02 OF 03 N00*06'22"W 359 AREA RESERVED FOR FUn R*HT-OF-A (SEE TRACT D NOTE ON SHEET AND SOOIV51: 299. EASEMENT, TYP )9oOL 0 R W1 10' x W STORMWATER EASEMENT HEREBY DEDICATED BY THIS PLAT R-2 ZONWO UWPLA 7TED a Ur4jrY AND vom" EASEMENT, lypl R4 #5 RIEW Wl CAP 4S 115721 wil STREET RIGHT-OF-WAY MONUME SHALL MoNU' &Sf; N M 70 FINAL UFT OF ASPHALT PAVEMX VLL BE PROVIDED BY THE CITY OF WHEAT ROM UPON REQUEST -Pt No 157♦9 BEKilmaK WORTH j CORNER, SECTION 2 FRO Z9 BRASS CAP ELEVATIONS ARE BASED ON THE COY OF WHWI RIDGE ON JPHAC PLS# 13212 IN RANGE BOX I A CRY ♦ WHEAT RID" 11/16 STAftESS STEEL ROD 1 2 FOOT LONG WITH SLEEVE AND DATUM ACCESS COVER, STATE PLANE COORD A1 LATN3T46`09,72O504* u ELEVATION - 54 FEET (NAVD OAT M F- LON'WIOS'04'53.207629* CITY OF WHEAT RIDGE DATUM U&S QE OFMINQ5. *70582148 E. 184+125 BEARINGS ARE BASED ON THE SOUTHERLY LINE OF THE NORTHWEST QUARTER OF SECTION 26, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PR94CPAL MERIDIAN BEAR N 89*45 ' 02 'E BETWEEN THE WEST QUARTER CORNER BEING A FOUND 3 %* ALUMINUM CAP PLS # 13212 IN RANGE BOX AND THE CENTER QUARTER CORNER SONG A FOUND 3 34 ALUMJNUU CAP PLS # 132t2 IN RANGE BOX, rl N CHAIN LINK FENCE --------- BARB #ARE FENCE PROPOSED PROPERTY LINE RIGHT—OF—WAY LINE SECTION UNE ME N mm JANUARY 22, 2015 NOVEMBER 3, 2014