Loading...
HomeMy WebLinkAbout3341 Yukon CourtA i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: ko Job Address: E3q I D i -- Permit Number: -20/70/7q7 ❑ No one available for inspection: Time Re -inspection re uired: Ye No C When corrections have been made, call for re-inspectionl/at 303-234-5 33 Date: _' / _%' % 7 inspector: DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: k -.;.l I p Job Address: VVI iy �TuO C -r Permit Number: 7 0 /_70 17 9 T7 ❑ No one available for inspection: Time AN Re -Inspection required: Yes �,9 When corrections have been made, call for re -inspection at 303-234- Date:- 61l 7 l 17 Inspector: 6 A I` DO NOT REMOVE THIS NOTICE City of Wheat Ridge Residential Roofing PERMIT - 201701797 PERMIT NO: 201701797 ISSUED: 06/09/2017 JOB ADDRESS: 3341 Yukon CT EXPIRES: 06/09/2018 JOB DESCRIPTION: REROOF HOUSE WITH ATTACHED GARAGE PITCH IS 8/12; OWENS CORNING DURATION STORM SHINGLES; 27 squares *** CONTACTS *** OWNER (318)801-4794 KNIGHT JAMES CARLIE SUB (303)917-0628 Bob Schneider 160147 New Vision Roofing & Ext. *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 11,404.00 FEES Total Valuation 0.00 Use Tax 239.48 Permit Fee 236.00 ** TOTAL ** 475.48 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding k/2 -inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer&ems installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer&#39;s technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. PERMIT NO: JOB ADDRESS: JOB DESCRIPTION City of Wheat Ridge Residential Roofing PERMIT - 201701797 201701797 3341 Yukon CT ISSUED: 06/09/2017 EXPIRES: 06/09/2018 REROOF HOUSE WITH ATTACHED GARAGE PITCH IS 8/12; OWENS CORNING DURATION STORM SHINGLES; 27 squares I, b}i my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performe nd that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. �. i zo:d-) 6/1 Signature o OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and_procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5, The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to f any inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line. Kimberly Cook ao n oPq 1 From: no-reply@ci.wheatridge.co.us Sent: Thursday, lune 8, 2017 12:18 AM \ To: Permits CommDev Subject: Online Form Submittal: Residential Roofing Permit Application Categories: Kim Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. Permits are currently being processed within 24-48 hours, subject to change based on volume. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Existing permits that require amendments (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email Address Do you have a signed contract to reroof this property? It will need to be provided at the time of permit pick-up. 3341 YUKON CT. JAMES KNIGHT 318-801-4794 JAM ESKNIGHT64@YAHOO.COM Yes CONTRACTOR INFORMATION Contractor Name Contractor's License Number (for the City of Wheat Ridge) Contractor Phone Number NEW VISION ROOFING & EXT. 160147 3039170628 Contractor Email Address newvisionroof@gmail.com (permit pick-up instructions will be sent to this email) DESCRIPTION OF WORK Is this application for a new permit for a residential roof? Are you re -decking the roof? Description of Roofing Material How many squares of material? Provide additional detail here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract value or cost of ALL materials and labor) Yes No OWENS CORNING DURATION STORM SHINGLES 27 REROOF HOUSE WITH ATTACHED GARAGE PITCH IS 8/12 11404.00 SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. z I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant Bob Schneider Email not displaying correctly? View it in your browser. CUSTOMER AGREEMENT Contingent upon Insurance approval New Vision Roofing & Exteriors LLC 7380 W. Calahan Ave, Lakewood, CO 80232 303-917-0628 Bob@New-Vision-RoofinQ.com New-Vision-Roofing.com Licensed & Insured. BBB Accredited Property Owner Email Date Street Address Estimator City, ST ZIP Insurance Company Home Phone Work Phone Claim # • • •MM Full Partial Repair � Full Partial Repair Damage: yes no Type: Damage: yes no Type: HOUSE GARAGE PATIO SHED SHED2 STUCCO VINYL WOOD OTHER: Roof Type: Style: Color: Drip Edge Color: WR= Full Partial Repair ❑ Inspect Decking ❑ Inspect Flashings S" —Res. 6" —Comm. Alum. Steel ❑ Clean Up & Remove Debris Lf: Color: Payment Options Work to be completed according to the above specifications in the amount of: $ (not to include insurance supplements, permit costs or any unforeseen construction costs) Balance due upon completion ❑ Cash sale ❑ INSU RANCE AGREEMENT. The homeowner authorizes New Vision Roofing & Exteriors to represent their best interest in pursuit of full replacement costs for damages believed to be covered under homeowner's insurance and allows New Vision Roofing & Exteriors to deal directly with the insurance company regarding this claim. This contract does not obligate the homeowner or New Vision Roofing & Exteriors until the claim is approved by the insurance company, and accepted by New Vision Roofing & Exteriors. Upon approval of claim, New Vision Roofing & Exteriors will complete all specified work at a price agreeable to the insurance company (RCV only) and New Vision Roofing & Exteriors, with no additional cost to the homeowner except for the deductible. You have the right to rescind this contract and obtain a refund of any deposit within 72 hours after entering contract. If you plan to use the proceeds of a property and casualty insurance policy to pay for roofing work, you may rescind this contract within 72 hours after you receive written notice from the property and casualty insurer that your claim has been denied in whole or in part. Final agreed upon price will become the final contract price, regardless of estimated contract price above. New Vision Roofing & Exteriors shall hold in trust any payment received from homeowner until roofing materials delivered at site or a majority of roofing work has been performed. I (We) agree, by signing below, to all contract conditions on both front and back, of this agreement. Homeowner's Signature: Date of Acceptance: Homeowner's Signature: NVR Signature: 1. If the property owner plans to use the proceeds of a property and casualty insurance policy pursuant to part 1 of article 4 of title 10, C.R.S., to pay for the roofing work, pursuant to section 6-2-105, the roofing contractor cannot pay, waive, rebate, or promise to pay, waive, or rebate all or part of any insurance deductible applicable to the insurance claim for payment for work on the covered residential property. 2. New Vision Roofing & Exteriors carries workers' compensation, automobile and commercial general liability insurance. A copy of the Certificates of Insurance may be obtained by calling insurance carrier, Colorado Insurance Professionals at 303-755-8600. 3. All Contracts subject to approval by New Vision Roofing & Exteriors LLC management. Contract price is valid for ninety (90) days. 4. New Vision Roofing & Exteriors reserves the right to perform specified work in accordance with generally accepted construction guidelines, while adhering to local codes in effect at the time of contract. 5 Our standard payment terms are fifty percent (50%) upon delivery of materials, and the remaining fifty percent (50%) upon completion of labor. All checks must be made payable to: New Vision Roofing & Exteriors. 6. All excess materials remain the property of New Vision Roofing & Exteriors. Homeowner is responsible for Homeowner's Association approval of roofing products and colors. 8. Homeowner acknowledges New Vision Roofing & Exteriors as a general contractor; as such New Vision Roofing & Exteriors will be entitled to ten percent (10%) overhead, and ten percent (10%) profit, (O&P) if approved by the insurance company, as part of the claim. 9. An account is defined as past due when 30 days have elapsed from the date of completion of work. Past due accounts will earn interest at a rate of one and one-half percent (1.5%) per month or eighteen percent (18%) annually. If New Vision Roofing & Exteriors is required to turn the matter over to an attorney for collection, the homeowner also agrees to pay all costs incurred, including attorney's fees. 10. Should default of payment occur on this contract, New Vision Roofing & Exteriors reserves the right to place a mechanic's lien on the contract property. 11. New Vision Roofing & Exteriors shall not be held liable for failure of performance due to labor controversies, strike, fire, hail, weather, inability to obtain material from usual source, or any other circumstance beyond the control of the company. 12. Our standard workmanship warranty for roofing is five (5) years. 13. New Vision Roofing & Exteriors is not responsible for any leaks or water damage below the roof line caused by excessive wind, ice or hail during the period of the warranty. 14. You have the right to rescind this contract and obtain a refund of any deposit within 72 hours after entering contract. If you plan to use the proceeds of a property and casualty insurance policy to pay for roofing work, you may rescind this contract within 72 hours after you receive written notice from the property and casualty insurer that your claim has been denied in whole or in part. However, New Vision Roofing & Exteriors is entitled to retain payments or deposits to compensate New Vision Roofing & Exteriors for roofing work actually performed in a workmanlike manner consistent with standard industry roofing practices. New Vision Roofing & Exteriors cannot pay, waive, rebate, or promise to pay, waive or rebate all or part of any insurance deductible applicable to the insurance claim for payment of roofing work on your property. If this contract is cancelled by the homeowner, after 72 hours of execution, the customer agrees to pay New Vision Roofing & Exteriors twenty percent (20%) of the contract price, set by the insurance company, only if materials have been delivered or work has been performed, as liquidated damages. This payment is not a penalty, but is fair and just compensation for services rendered to that point. 15. New Vision Roofing & Exteriors will not be held responsible for slight scratching or denting of gutters, droplets of oil in the driveway, cracks in concrete, or damage to plants and trees. Furthermore, New Vision Roofing & Exteriors will not be held responsible for exterior damages such as deteriorated trim pieces, crown molding, stucco, solar panels, evaporative coolers, existing skylights, or interior damage such as falling dust and debris, cracked plaster, sheet rock or nail pops, as a result of normal re -roofing. 16. Replacement or repair of the deteriorated decking, fascia boards, swamp coolers, ventilators, chimneys, counter flashing, or any other work completed for the homeowner not explicitly stated in this contract, are not included in quoted price and will be charged as extra on a time and material basis. City of Wheatjdge COMMUNITY DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2846 F: 303.235.2857 DATE: February 6, 2017 TO: Accounting Department FROM: Meredith Reckert, Senior Planner SUBJECT: ESCROW REFUND/RELEASE Request for Release Reimbursement requested for funds for in the amount of $11,500.00 (Eleven thousand five hundred dollars and no cents) being held for landscaping for property located in the Yukon Grove Subdivision generally located at 32"d Avenue and Yukon Court. Please note that the requested amount was provided in separate payments submitted at various times for a total of $11,500 (see attached). The landscape improvements have been completed to the City of Wheat Ridge's satisfaction. MAKE PAYMENT TO: SEND TO: Yukon Grove, LLC Yukon Grove, LLC P.O. Box 102563 Denver, CO 80250 Meredith Reckert for Ken Johnstone Director of Community Development www.ci.w heatridge.com s Meredith Reckert From: Jackie Kowal <Jackie@nicholascustomhomes.com> Sent: Thursday, January 5, 2017 2:17 PM To: Meredith Reckert; Tammy Odean Subject: Escrow refunds for Yukon Grove Follow Up Flag: Follow up Flag Status: Flagged Hello Meredith, Could you please process the refund of the escrow for the following addresses. I believe they are all complete. 3320 Yukon (1500) •3350 Yukon (15 00) -3360 Yukon (1500) 3330 Yukon (1500) 3340 Yukon (15 00) 3351 Yukon (1500) 3205 Yukon (1000) 3341 Yukon (1500) Jackie Kowal Accounting Manager Nicholas Custom Homes Inc. Mailing address: PO Box 100068 Denver CO 80250 4201 E Yale Av, Unit B 13 5 Denver CO 80222 303-953-9525 ofc 303-828-8985 cell iackie(anicholascustomhomes.com invoicesnnichol ascustomhomes. com 1 A B C D E F G H I Landscaping Escrow Log AddressI 2 83 3869 Tabor Court Developer Stan Pac Date Received 2 52016 Amount 51000.40 Expiration Date 0601-2016 Amt. Released Released Date Remarks 84 3860 Tabor Court Stan Pac 02'12'2016 SL000.00 06'012016 85 10100 W. 38th Avenue ]4CG MominaStar 02192016 S 27.090.00 09'01'2016 S 27.090.00 08 03'2016 landscaping, arlan lot curb 86 3223 Jellison Biran-Morrison02252016 51.500.00 06'012016 s1.500.00 10132016 front vardlandsc in S7 5750,5760, 5780, 5790 W. 39 Incamation 02'25 2016 511,343.40 0601 '2016 512:833.00 1221-2016 landscaping around units 88 3869 Taft Stan Pac 03'18'2016 1 51:000.00 06'012016 front yard landscaping 89 7340 W. 44th Avenue BC Builders 03'182016 5 125.348.71 09012016 S 125348.75 05 272016 all landscaping 90 3440 Quail Court Quail Hollow- 04 04'2016 51,500.00 0,6012016 front yard landscaping 91 3225Yu1<onCourt Yukon Frove 05032016 51.500.00 06'01'2016 511500.00 09162016 front yard lands raping 92 3371 Yukon Court Yukon Grove. LLC O5 '03 2016 51,500.00 06012016 51:50000 09 16 2016 front yard landscaping 93 3321 Yukon Court Yukon Grove, LLC 04 122016 SI,500.00 06'01 `2016 S1.500.00 06 28°2016 front yard landscaping 94 3311 Yukon Court Yukon Grove, LLC 51,500.00 06 282016 landscaping 95 4110li ham William Powell 05 132016 1 51,000.00 06 30'2016 S 1000.00 0' 012016 front yard landscaping 96 3250 Iris Court Loumar Enterprises 05 27 2016 52,400.00 07 31 2016 front and side yard landscaping 9' 3391 Yukon Court 06'02'2016 51500.00 08 012016 $1.500.00 09 162016 front yard landscaping 98 InCamation InCamation 06092016 523.16;.00 09012016 523.16.00 12 -212016 trail desigan and construciton 99 3205 Iris Court Loumar 05 '312016 52,000.00 08312016 52,000.00 09 09'2016 [landscaping, - comer lot 100 3330 Yukon Corot / Yukon Grove, LLC 09'162016 51.500.00 10312016 101 3340 Yukon Court Yukon Grove, LLC 09'16'2016 51,500.00 10'31'2016 102 3341 Yukon Court Yukon Grove, LLC 09162016 51500.00 10312016 103 3331 Yukon Court Yukon Grove, LLC 06 30 2016 SI.50O.00 OS 012016 51,500.00 09 16 2016 104 3351 Yukon Court ^ Yukon Grove, LLC 10 712016 SI,500.00 04 30 201' 105 3350 Yukon Court- Yukon Grove. LLC 1102 2016 51.500.00 04 30 201' 106 3360 Yukon court ..— Yukon Grove. LLC 1102 2016 91,500.00 0.1'30 7017 107 3840 Tabor Court Stan Pac 11 16 2016 S1:000.00 04%30 2017 108 11305 W. 33rd Quail Hollow 11 '22 2016 550090 04 302017 front vard sod 109 11355 W. 33rd Quail Hollow- 1122'2016 5500.40 04 302017 front yard sod 110 3320 Yukon Court " Yukon Grove, LLC 11'232016 51,500.00 04 30'2017 front yard landscaping 111 3350 Quad Quad Hollow 1230'2016 5500.00 0430201' sod 112' 113 114 115 116 Meredith Reckert From: Jackie Kowal<jackie@nicholascustomhomes.com> Sent: Thursday, January 5, 2017 2:17 PM To: Meredith Reckert; Tammy Odean Subject: Escrow refunds for Yukon Grove Follow Up Flag: Follow up - Flag Status: Flagged Hello Meredith, Could you please process the refund of the escrow for the following addresses. I believe they are all complete. 3320 Yukon (1500) 3350 Yukon (15 00) •3360 Yukon (15 00) 3330 Yukon (1500) 3340 Yukon (1500) 3351 Yukon (1500) 3205 Yukon (1000) 3341 Yukon (1500) Jackie Kowal Accounting Manager Nicholas Custom Homes Inc. Mailing address: PO Box 100068 Denver CO 80250 4201 E Yale Av, Unit B 135 Denver CO 80222 303-953-9525 ofc 303-828-8985 cell i ackiena,nicholascustomhomes. com invoices &nicholascustomhomes.com 1 City of ]��-�'Wheattk - .. COMMUNiTy DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 291' Ave January 23rd, 2017 Owner/Occupant 3341 Yukon Ct. Wheat Ridge, CO 80033 Wheat Ridge, CO 80033-8001 P: 303.235.2855 F: 303.237.8929 RE: Previously permitted project plans available for retrieval — Permit 201600311 (New Single Family Home) Owner/Occupant, This letter is being sent to you because a project for which a permit was issued by the City of Wheat Ridge Building Division and plans and/or other documents were required was recently completed and approved. In accordance with the Building Division's document retention policy, the associated plans and/or other documents are scheduled for disposal. We are writing to offer you an opportunity to retrieve those approved plans and/or documents prior to their disposal by the Building Division. The plans and/or documents are available for retrieval for a period of 20 working days (4 weeks) from the date of this letter and must be retrieved in person at the Building Division offices. This letter must be presented at the time of retrieval of the plans and/or documents. Plans and/or documents available for retrieval CANNOT be mailed and plans and/or documents will NOT be available for retrieval after the expiration of the retrieval period, which is 60 days from the date of this letter. You may retrieve plans and/or documents between the hours of 7:00 a.m. and 5:00 p.m., Monday through Friday, at the Building Division offices located at 7500 W. 29h Avenue in Wheat Ridge. Cordially, Melissa Mackey Senior Permit Technician 7500 W29th Avenue Wheat—V i in RM) Office Phone: 303-235-287 Fax: 303-237-8929 City of heat idge COMML)Nrry DEVELOPMENT www.ci.wheatridge.co.us DosseylSudik STRUCTURAL ENGINEERS September 21, 2016 Yukon Grove, LLC Mr. Bob Nettleton P.O. Box 102563 Denver, CO 80250 RE: Structural Analysis Yukon Grove Subdivision Wheat Ridge, CO Plan A — Including the following addresses 3320, 3330, 3340, 3341, 3351, & 3360 Yukon Ct. Dear Mr. Nettleton; At your request, this office performed a structural analysis for the above listed residence. The purpose of the analysis was to review and provide recommendations for the conditions described below. The pertinent information regarding the analysis is as follows: POST CAP MODIFICATION It has come to the attention of this office that the front porch beam to post connection was modified to be a concealed connection. The two 4x8 beams were mitered over the 6x6 post. Leger loks were installed through the post and into each of the beams. Analysis by this office shows that the existing condition is structurally acceptable to support the applied loads. No modifications are required. Please contact our office if we may be of further assistance. Sincerely, Jamie Doerr Project Manager Dave Dossey, P.E. Principal AL 6025 S. Quebec St., Suite 375 Centenniol, Colorodo 80111 303.996.0208 303.477.5680 r City of Wheat Ridge Single Family - New PERMIT - 201600311 ?FRMIT NO: 201600311 ISSUED: 03/31/2016 TOB ADDRESS: 3341 Yukon CT EXPIRES: 03/31/2017 TOB DESCRIPTION: Plan A - Farmhouse per approved master plan. t** CONTACTS *** OWNER (720)290-3140 YUKON GROVE LLC �C (303)598-4967 Robert L. Nettleton 150101 Nicholas Custom Homes, Inc. SUB (303)680-7484 Delmar 018323 Delmar Electrical Contractors SUB (303)472-7074 Nathan Stickley 150262 Stickley Plumbing SUB (303)287-1846 Joy Valentine 021169 Cool Sunshine Heating & A/C `** PARCEL INFO ;ONE CODE: UA / Unassigned USE: / SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: / `** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 196,023.00 FEES Cotal Valuation 0.00 ?lan Review Fee 558.68 Ise Tax 3,528.41 ?ermit Fee 1,757.70 'na_in. Review Fee 150.00 — TOTAL ** 5,994.79 `** COMMENTS *** `** CONDITIONS *** SH: Approved per plans and red -line notes on plans. Must comply with 2012 IRC, 2014 NEC and all applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections. ME: Prior to issuance of CO for individual homes, the following landscape improvements shall be installed in the front yard of each lot: one (1) 1.5" caliper deciduous or ornamental tree or one (1) 6-8' evergreen tree; eight (8) shrubs; 5' border of 1.25" river rock adjacent to the foundation; sod; and an automated irrigation system. As part of the foundation inspection and PRIOR to the first framing inspection, a completed, signed and sealed, Foundation Setback and Elevation Certification shall be submitted to the City for review. The certification form shall be fully completed by a Professional Land Surveyor licensed in the state of Colorado, stating that the foundation was constructed in compliance with all applicable minimum setback and elevation requirements of the City. MVN: Prior to project completion or granting of a Certificate of Occupancy, an As -Built Survey or Improvement Survey Plat shall be submitted to the City. INSPECTION RECORD INSPECTION REQUEST LINE: (303) 234-5933 Occupancy/Ty�e Inspections will not be performed unless this card is posted on the project site. Call the inspection request line before 11:59 p.m. to receive an inspection the following business day. Inspector Must Sign ALL Spaces pertinent to this project Wall Sheathing Foundation Inspections Date Inspector Initials Comments Monolithic Slab Reinforcement Water Service (Underground) Caissons Plumbing (Below / In -slab) -/ Concrete Encased Ground (CEG) Heating (Below/ In -slab) Rough Electric A Footing/Stemwall P.E. Letter Inspector Initials Comments Do Not Pour Concrete Prior To ADDroval Of The Above Inspections Underground/Slab Inspections Date Inspector Initials Comments Electrical (Underground) Wall Sheathing Sewer Service (Underground) Roof Sheathing Water Service (Underground) Plumbing (Below / In -slab) -/ Heating (Below/ In -slab) Rough Electric A a� •/ i. Do Not Cover Underaround or Below/In-Slab Work Prior To Annroval Of The Above lrr-nections Rough Inspections Date Inspector Initials Comments Wall Sheathing Roof Sheathing f- Lath / Wall Tie Rough Electric A a� •/ i. Inspector Initials Comments Rough Plumbing Z 5Li Rough Mechanical- - 13 u Gas Piping -2�j �� ��tf Do Not Proceed Without ADproval Of Above Rouah InsDectfons Rough Framing Insulation Drywall Screw / Nail f- Final Inspections Date Inspector Initials Comments Final Electrical 5Li Final Plumbing '2`1'l ` 13 u Final Mechanical -2�j �� ��tf Roof Final Building / Frame •-� i (� L ; y�' W Landscaping & Parking / Planning Dept. Inspections from these entities should be requests one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. f'�'�r Fire Inspection / Fire Protection Dist. "*Note: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather i I, i i 1 ,fl m m > m r-1 o y ti O v � y � CD w t O 0 w m .mq v " o 41 b A Q ❑0 q d O o tp U ri M m m Z U d o A rz. N r \ Q o A $ p .f� w a 1% v 00 R7 m m 7 41 � 9W � q V W m b m W o a m (16,O w e O a� u " m H 9' ,4 CD m F m m ['� rd a m o o144 H Z x y w L w O .a O w a x u m o o z$ >+ PO u o m4.) 0 W 3 u N f. F. r i) N 1 J�LL' LJ y 0 m > O rl CD gQg '� o o b rd u \\ i Z �+ m 6 A y (� u 0 H o pi V o F Q o m m O N w m b a o A U W 0 x0 U 3 14 41 0 v o u t a w w ri O d rn z ry A m 4 no, ,d m a s In 0 v A A Q)V b b1 $4 W m o 3 (d a W m u � l •" y b y Z U rn U O O134 m 1 v CD o ,. m $ a° N 7 z � ,p°v � m o " .a " y a m A o U a v o pp0G, Q 3 wq m a P m 0 U �\ 2 W O 3 W U O N > b ; .. z 41 W mq o H N y U r•1 .. u ro„ a m u w u Q �a g o o W A •.i o w 41 8 z Q° i o 1 O N m 0 1 �4 qm" a a u F m p 0 y .4 5o11110 o a QI • F A ro o U a w N U I �c o` i CITY OF WHEAT RIDGE ��9rBuilding Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: �r I M r f� �� f► 3 Y f Job Address: ,34 f y U Kv Al C r Permit Number: oi6Q 0 3 t 1 1 ec+.. C 4 ( ;:w, /qc1 I 1A ie C / � ^�.., r tl It /1 i /i I if A, ^ ' • %�0 O', a rte' ❑ No one available for inspection: Time / O: qA/PM Re -Inspection required: Yes No *When corrections have been made, call for re -inspection at 303-234-5933 Date: q '�`i Inspector: Jjj4J v' - DO NOT REMOVE THIS NOTICE 10 ' Dossey I Sud *1 k STRUCTURAL ENGIN ERS June 2, 2016 Nicholas Custom Homes P0 BOX 100068 Denver. CO 80250 RE: Foundation Footing and Foundation Wall Observations, 3341 Yukon Ct. Dear Mr. Nettleton-, On April 28, 2016 a footing observation was performed and on May 6,, 2016, a foundation wall observation was performed on the residence listed above. The applicable information concerning the observations is as follows: SPREAD FOOTING FOUNDATION OBSERVATIONS — Lil �8, 2016 The footing widths and depths were formed according to the contract documents. Properly sized horizontal reinforcing was provided continuously in the forms. The reinforcing steel for the footings was properly lapped and tied and had been placed in the forms prior to concrete placement. Footing dowels were on site, Footing forms were placed on undisturbed natural soils and were clear of debris and loose soil, FOUNDATION WALL REINFORCING OBSERVATION zMay, 6,201( The foundation walls height, thickness and reinforcing were formed according to the contract documents. Reinforcing was placed to provide adequate cover and was properly lapped and tied, The anchor bolts were on site and sized according to plan. The foundation forms were centered over the spread footing foundation system, Vertical dowels extended from the footing into the foundation wall at 24" on center. The foundation forms were clear of debris and loose soil. Please contact our office if we may be of further assistance. Observation By - VN Approved Bill 37r) 5,1 00� "Nti A rave W. t"osscy, r.V1. � 303,996,0208 303,477,5680 ^0% COLORADO GEOSCIENCE AND DESIGN, Inc. Open Hole Observation Form 3341 Yukon Court kiit.+Wde �&'*W MUMM0191 0 a substantial compliance with the plans and specifications designed for this project and the site where it is constructed, M 4/28/2016 EXCAVATION OBSERVATION AC SOIL REPORT INFORMATION- COLORADO GEOSCIENCE AND DESIGN INC 15-402 �JJO % 0 50452 5 NOT VALID WITHOLJI'ORIGINAL SIGNATURE # I•I ,- WS 1 � �0 *�01 0 1 - = •1 substantiW compliance with the plans and specifications designed for this project and the site where it is constructed, 5/14/2016 DRAIN & DAMPPROOFING SOIL REPORT INFORMATION: Colorado Geoscience & Design Inc, 15-402 Observations Reviewed by: NOT VALID WITHOUTORIGINAL SIGNATURE 'k 000.009 r NA NOT VALID WITHOUTORIGINAL SIGNATURE 3341 Yukon Court t + ,ilt, in substantial compliance with the plans and specifications designed for this project and the site where it is constructed. Date Observed by: 4/28/2016 CONTINUOUS SPREAD FOOTING OBSERVATION AC Note: Dossey Sudick Structural Engineers Plan A Lot #10 S1,0 dated 3-1-16 SOIL REPORT INFORMATIM COLORADO GEOSCIENCE AND DESIGN INC 15-402 AXI,� VN I A % iv OT' WITHOUT ORIGINAL SIGNATURE iv OT' WITHOUT ORIGINAL SIGNATURE A i CITY OF WHEAT RIDGE �(303) Building Inspection Division (303) 234-5933 Inspection line 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: L M G�_ Job Address: \' Uy ( `J C -r Permit Number: %o1 (,®o3u c_leer • � e z „ c P r o -r ed Iy.- M Yee-1'Po . a ❑ No one available for inspection: Time Re -Inspection required: Yes �' *When corrections have been ma e, call for re -inspection at 303-234-5933 Date: Inspector: _ // DO NOT REMOVE THIS NOTICE This agreement made this 16'h day of September, 2016, by and between the City of Wheat Ridge and Yukon Grove, LLC for escrow in the amount of One thousand five hundred dollars and zero cents ($1500.000 being held by the City of Wheat Ridge until landscaping is competed at 3341 Yukon Court In the event that front yard landscaping by October 31, 2016, the City of Wheat Ridge or its designee shall have the ri lot to enter upon said property to construct and/or install such improvements or do other such work to accomplish that purpose as may be necessary, provided that the, City of Wheat Ridge shall first give notice in writing to the property owner of its intent to do so. If the City of Wheat Ridge exercises its right to perform work of any nature, including labor, materials and use of equipment either by force acco nt or con act th City sh 11 have the absolute right to withdraw the escrow funds to complete said improvements. fmA4&*A"Nqjpw,%.wha11 be a letter from the Community Development Director, stating that the improvements have not been completed or provided and that the compliance date of October 31, 2016, has expired. General Contractor: uate I Itle M=MIMN By: Title: Date: I 0 0) p (D 0 0 0 0) F . � 1!lVli�lrNlll { u...: Plawparmit# 'Z, Plan Review r-ee-4 afing Permit Application Please *=Piete all highlighted areas on both skies of this fa�m. III PrOPerty Owner Email: Mailing Addrwm: [if - �- � .. � I "I'll, "1 4 I'll, , ... Architect/Engineer E-mail: Contractor. COntractors City Licenset- Phone: > W -R. City License -T 1.0 Ix !E� Mechanical: W.R. City License # 9, co an m1formation on BOTH siles of th- Is form t 11. -to ............ �W NEW COMMERCIAL STRUCTURE ELECTRICAL SERVICE UPGRADE EW RESIDENTIAL STRUCTURE COMMERCIAL ROOFING COMMERCIAL ADDITION RESIDENTIAL ROOFING RESDENTIAL ADDITION WINDOW REPLACEMENT COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) I RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) 1 MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT PLUMBING SYSTEWAPPLIANCE REPAIR or REPLACMENT ELECTRICAL SYSTEWAPPLIANCE REPAIR or REPLACEMENT I OTHER (Descnibe) am Sq. FtJLF 7 stu's Z Amps Squares I -I Projett value: (Contrqct.IwIu4;I-,,1 1, "long Other OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the Ci of Wheat Rid or covenants Is cti f CIRCLEONA: (OWNER) (CONTRACTOR) or (AUTHO TIVE) of (OWNF-R)( IGNATUP.E. MATE: 9&1 NAME�� DEPARTMENT USE ONLY ZONING COMMMENTS, OCCUPANCY CLASSIFICATION, Review, 7 BUILDING DEPARTMENT COMhIENTtI: Reviewer C, PUBLIC WORKS COMWNTS: i) vigse.-r icor-.094*J POW9-15r-� AS !�5;AOW)4 C14 94P Realewar M\14 1-1,040P 62APIW-v FLAN 7'o FPcre1,--r ACUAe-C-Alr PP-0f9P71AaS B1+110 0. - 0J0FP,- PAIN4C-X- oaarlpre;4-new Larrr;v- �5;iuu- oe 94alo- ERM 9E &20-1~7 v-- - ,I M.- .m 711M A City of SINGLE FAMIL YIDUPLEX ��Wh6atp"'Ldge BL[ILDINGPERMITAPPLICATION,REVIEW PUB11C WORKS Date: Location: ATTENTION: BUILDING DIVISION I have reviewed the submitted application documents to construct a located at the above referenced address. Please note the comments checked below. I Drainage: a. Drainage Letter & Plan required: Yes No b. Site drainage/grading plan have been reviewed and are: OK 2. Public Improvements required & to be completed with project: a. street paving/patching: — Yes No — Completed b. curb gutter: — Yes 3/ No — Completed c. sidewalk: — Yes --A/ No — Completed d. Other (specify): — Yes — No — Completed For items not constructed, the amount of funds taken in lieu of construct ion: $ 3. -N/-- Does all existing roadway/alley R,O.W. meet the standards of the City: --V- Yes No If not, what is required? If R.OW. is required, has the deed been received: Yes No (see Note below) NOTE, All deeds must be reviewed and approved prior to issuance of the Certificate of Occupancy, 4. -3/— AMPROVED: The Public Works Department has reviewed the submitted material and hereby approves this Pennit Application, subject to the stated requirements and/or attached stipulations. TigneKaurt! M�arkllan �Nattai�i 5. 0 NOT AEPROVED: The Public Works Department has reviewed the submitted material and does not approve this Pen it Application for the stated reason(s): Signature Mark Van Nattan 6. -� Stipulations: RM 7. -4- A Drainage Certification Letter accompanied by As -Built plans from the Erigineer-of-Record shall be required prior to the issuance of the Certificate of Occupancy, 8. -�L- NOTE: ANY DAMAGE TO EXISTING PUBLIC IMPROVEMENTS AS A RESULT OF PROJECT coNs,rRUCTION SHALL BE REPAIRED PER ROW CONSTRUCTION PERMIT PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY, pity f ' U 13 t,1 C ANO R KS City of Wheat Ridge Municipal Building 7500 W, 29'h Ave. Wheat Ridge, CO 80033-8001 I': 30123 ,2861 E 303,235Z57 Date: _VAII� Location of Construction- Purpose os cti n -purpose of Construction Single Family Commercial Multi -'aridly (Required of all projects for document processing) R t e�rt�rrter�ci�ali�ttltf-Faro 7 llevle '�; • Review of existing or minimal technical documents: ..... .......... $200.00 • Initial review' of technical civil engineering documents (Fee includes reviews of the I" and 2'd submittals):, ......... .......... $600 .00 • Traffic Impact Study review Fee; (Fee includes reviews of the I ss d 2 ,d submittals) :.. ... ___ ....... ..... $500.00• S 'rip Generation Study Review :Fee: ,. ......... ......... $200.00 M Manual Review & SIVA Recording Fee......... _......a.. .._...... $I00�00 s Each Application will be reviewed by staff once and returned toy- changes. If after review of the second submittal changes have not been made to the civil documents or the Traffic Steady as requested by staff, further reviews of the Application will be subject to the following Resubmittal Fees: Resubmittal Fees 3 d submittal ('/i initial review fee)-,,, ......... ......... ......... $300.00 4a submittal (full initial review fee): ... ............... $60000 f S All subsequent submittals:... .... (Dull initial review fee) ...,,.... �......... ............................. 6tltl.tltt TOTAL REVIEW PLEASE NOTF THAT IN ADDITION TO THE ABOVE FEES, THERE WILL BE ADDITIONAL LICENSING AND PERMITTING FE -ES REQUIRED FOR CONSTRUCTION OF, IMPROVEMENTS WITHIN PUBLIC aysa xi,aaIieata idge xo ass _Wh6atR�is!gc 1,t 11 1 1 c, WoitK's City of Wheat Midge Municipal Building 7500 W. 9" Ave. Wheat Ridge, CO 80033-8001 P: 303.235,2861 F301235.2851 NOTIFICATION FOR PLTC IMPROVEMENTS RESTORATION D ADDRESS: Bear Contractor: In conjunction with the approval of the building permit application for the above referenced address, this letter is to inform you that all existing public improvements located along the frontage ofsaid address shall be restored,(if damaged from related construction to an acceptable condition, as determined by City of Wheat Ridge Public Works Department, and prior to the issuance of a Certificate of Occupancy. .prior to any construction commencing, the City's representative will conduct an onsite inspection to determine the existing conditions of the public improvements at this address. If you have any questions, please contact rile at 303.235.2864. Sincerely, David F. Brossman, R.L.S. Development Review Engineer CC: File Rev /0$ HINESM 11 IL 0 1 1 1 1 1 1 1 Address: Zoning: Lot Size: sq. It Lot Width: ft. Property in the flood plain? V -p— If yes, add surveyingeondition FLD. Type of project (applicable survey conditions in parenthesis): • Accessory ISP, ILC or site plan none if in floodplain (FID) • Addition ILC and site plan if Nv/in 2' of setback or in floodplain (FND) if in floodplain (FFD) t4" New ILC and site plan yes (FND) if wiin 2' of setback (NRS) if nLiocad lain. flL Maximum Lot Coverage: 0' — C3, 0 11 11 % sq. ft Existing Improvements: Proposed Improvements: House: sq. ft. House/addition: sq. ft. Shed: sq. ft. Shed: sq. ft Detached pgarage: sq ft. Detached Garage.: sq. ft. Other: sq. ft. Other: sq. ft. Total Existing sq. ft Proposed+Existing _ I (P&J7 sq. ft Lot Coverage % of Coverage % Required Setbacks: FR S S R Provided Setbacks: FR S 5' S i R For additions or new construction, is the structure within 2 feet of minimum setbacks? If yes, add surveying condition FFD. Maximum Height: ft. Maximum Size: sq. ft. Proposed Height: ft. Proposed Size: sq. ft. Parkland: If the permit is for new construction, have parkland dedication fees been paid? If no, add condition PFEE, notify owner, and notify building division. Streetscape: Does the permit result in any of the following conditions? LJ Construction of new roads LJ Platting of new lots LJ New development LJ Additions that increase floor area by 60% or more, (see fort-nula) (proposed floor area ­---­--­ I—— I— existing floor area----_-_) / existing, floor area =1 inc. If any box is checked.. SF/DUPLEX—Is there existing Ll Curb Cl Gutter L15 -foot sidewalk at3jacent, to the property? If curb, gutter or sidewalk is missing, strectscape construction or fees -in -lieu will be required. MULTIFAMILY --Does the frontage meet current city standards? If not, streetscape construction or fees -in -lieu will be required. Fs-in-lieu qI'dedication or construction are due at the time the permit is issued, I �-'o ra o Geoscience & Design, Inc. P.O,, Box 68 Franktown, Colomdo 8on6 » Phone' 30 . i . 1,50 < : 303.688.1295 oGeo esign Yukon Grove, LLC Box:102563 Denver, CO 8o25o SUBSURFACE INVESTIGATION OF REPORT NO. 15-402 MY 30, 2015 �a 44 w NOT VALID WrrHOUT ORIGINAL SIGNSWRE Lc'�5' 16 WMM Field and Laboratory lnvf Foundation Recommend, Criteria for tart Slat CONTENTS'ABLE OF stiglrr tions Placement of Foundation Fill Subsurface Drainage Surface Drainage Foundation Excavation Radon Gas Ganem! Information Location Map Log of Test Holes Swell / Consolidation Charts Summary of Laboratory Testing Details of Foundation Drain System Foundation Grading Detail Appendix 2 3 5 5 6 7 Figure Figure Figure Table 1 report YUKON3341 made to determine the t Groundwater t encounti observations represent the r( measurement and may not be ;rid levels can be expected to fluctuat sites use irrigation for lawns. Subsurface Investigation Yukon Grove, LLC Ido Geoscience and Design, Inc. report No, 15-402 s uring the subsurface investigation COLORADO, This investigation Ared, allowable bearing capacity, + i the field investigation. it is our ik a single-family • structure will consistof ♦ framed indation. We anticipate the foundation ieal foot of foundation • 'A July 2, 2015 at the site shown on the diameterilled with a four -inch (4") oon samplingtube.Thedet soil pths at which are on ..,boratoryTable field during the drilling operation Pough observation +! laboratory naturalThe moisture samples6d drive samples of typical soils, Swell- uThese ,adings ♦ w # condition. litno of the field investigation. ,onditions at the time of drilling or conditions at other times. Groundwater Site sol conditions encot presented in this report. performedrepresent the proposedi i performed only after the er bearing elevation. In sd4 recommendations based ur Based on our evaluation of tl single-family residence be fc professional engineer should 1. The footings and pads s 1,500 pounds per sd r fine-grained, medium d . No footing or pad sell All loose and disturbed footings or bearing pads, . All continuous footings lest 16 inches wide or recommend footings b Exterior footings should protection, or per county , The foundation walls s on an equivalent fluid surcharge or hydrostatic ,. In place structural s ttl accuracy, due to the lar However, based upon t is estimated that total differential structural yeti ints notedherein may jeopardizeto all absolve Coloradocl n V for any damages arisingfrom the 2 Subsurface Investigation Yukon Grove, LLC Colorado Gooscience and Design, Inc, Report No. 15-402 Swell t itt f Chart Slab Performance it Lo Moderate The concrete slab shall be strut Isolated from penetrations The fleeting concrete slab shall Subsurface investigation Yukon Grove, LL ado Geoscience sed Design, mc, Report No, 15-40 Renresentative Percent Swell 4 • Control joints shall be pr save cut or tooled to s portion n of the concrete feet nor a maximumdim • All non-bearing partition' flet to allow for slab- • • If s hot water h stin s slab if the slab is riti damage the piping durir into s concrete slab th with construction adhesi placement. • If s forced air furnace between the furnace am foundation walls shall be Density, ASTM «r"+' accomplished with hand -o compaction may cause • •s•il The installation of an exterior fps habitable space below grade l method of installing this system location a minimum of 15 -feet screened end section to preven perimeter drain may discharge In homeowners should perform r u stare it remains in good working` system can cause serious tot foundation l n , the rng Installation of the perimeter cera L1 Subsurface investigation Yukon Grove, LL €s Geoscience and Designs, inc, Report No, 15-402 2 trete slab, These control joints must b third of the thickness of the slab, No i area greater than neither 100 square i any direction without s control joint, flexible connection should be installed c�ll materi�a�lt to the foundation Aa minimum+.. .rd .. M each lift adjacent qs or other lightweightcompactors. 41 earth pressure, which N result in wall shouldbe usedin the compaction tter drainaged for a daylightimeter Drain Detail 1, for a suggest 4ar drain shall discharge at a daylig] home, The pump,i entering the drain. Alternatively, th ms of the sump pump system to ma to install and failure of a sump pum ,ems. Water accumulation aroun; �ffl M Subsurface investigation Yukon Grove, LL Colorado Geoscience and resign, Inc, Report No, 15-40 Subsurface Investigation Yukon Grove, LLC oscience and Design, Inc. Report No. 15-402 i r # ,Aa. t vur field I laboratory atesting. ochange and N ti IIoccLP for the foundation system directunder the J' 101 b wIf 1. Professional judgments ani � s e* in any manner, only that th AT" IM= concerning any environmen r of this report. PROPEM'Y %ISI ' .� LOT '8P 5'UTILITY MT__ PROPERTY LINF 0 PERC;Cit,.A"WN'3"ui's-11"us kJlti'.aS1. TAU F, A"IlL a {dY:.7ME HOLE E �w_ ..... SITE Yr GROVE, LLC SCALE JCB NO, BALL LOCAIJONS SP OWN ARF SASED ON SC e"MC WFQRM A"iYON FUENP+" M RX ar%iEpsov !MMAi`ESMADE0RIHE FIELD B1'CCILt'tR.AF�74".EC""�..IffPoCE}�i.&i'+#?�7.'dEt�T4#F L{7t,A"4:<NS, 15-402 Colorad 7RLANF&7�@RrET aSSON-SME iE00rN � i ���C� ��tSI Rfti7"sfZTY I) ECRS NPAREANDENURE MO iE 4s G7ffiQ:: t RR's P,3F9C. ARELOCATES') AVt3tt'IIJF. MAi"i"kii?�{ ANDOUT OF INAPPROPRIATE EAFEAMMS JEFFERSON COU91'Y, � � ALL 0STANC'ES ARE TO RP: VEMNE,'T PRIDE TL) E&d"AVA1VI*". COLORADO �. co �, JOB NO: 15-402 PROJECT: Subsurface Invests elan Colorado Geoscience and n) Inc.1 T: u n rare, LLC _ < mem A Y df 4 t• k 1 r n curt. Jefferson Goan , Colorado _m Log of Test Holes ORILLING METHOD: " Conbnuous Flight ,Auger 1 10 100 E 1 1, 10 10 Mone -grained sand, clayey to very clayey, medium d nes, sligfily l ist to mOista brown tr1 gf �s 92 92 1r2 l' 8 rn 88 µ 22112 84 a 84 80 80 a4 76 27112 76 7 7 Jre Applicable—dotes: lnc tea ground ea ter encountered during the drilling oiler l 1, xf indicates that' a, nurn er of bid1 0 140 -pound hemmer failing . r Indicat ground water encountered after 4 hours. inches are required to drive e -inch diameter sampter 11y' number of inches, td, �= c. lridic�te� lerrefusal, d. fL Indicates n v'nrg. Indicates depth t which $oil sample were taker, Figure ON VESTS Swell/Consolidation under pressure dud to getting EM 100 0 300 Test Halettl 3` Soli Desc _I Dee �i tE ri1�t e° lit + U -4 ry CL 0 6 3 Water added tea Sam 100 300 'fest Hole No. 1 Depth ' Soil Desc !i P�� 8 t r�at�it rrl JOB T 16-402 ON VESTS Swell/Consolidation under pressure dud to getting EM =I SWELL - + +8 +6 w U. U) 0 0: +2 0 z 0 0 W 2 0 0010 IZ -J -4 w 0 CL 0 z �6 0 8 Water added to sample 100 300 1 M APPI Test Hole No.-L��tl� ++8 +6 w ?., +4 LL (a 0 w +2 0 Z 0 F 0 z uj < -2 00 IX -J W 0 -4 Z 6 0 Water added =titer to sample tw 100 300 APP Test Hole No. I Dth 24' Soil JOB NOb 15-402 =I I APPENDIX Important Information About the Report Page I of 3 Table I presents the relative classification criteria for the percentage of expansion relative to the initial sample height, at the indicated surcharge pressure, Swell,Potential Chart SWELL POTENTIAL AT 1,000 LBS, CLASSIFICATION 0 to V2�Non-expansive/Very low V2 to 1',°x% Low 1 `2 to 3 1Y2,% � Moderate d to % Very I -f g Greater than % Critical The swell potential classifications are based seri the percentage of swell for samples placed on swell/consolidation machines under a surcharge of 1000 pounds per square foot. The relative swell classification can be correlated to potential slab damage a follows: €a - minor slab cracking, minor differential movement, and heave Moderate - lab cracking and differential movement, partial framing void and furnace plenum closure, High to Very High- large slab cracking and differential movement, closed voids, closed furnace plenum, and possible pipe rupture. These effects are leased on monitoring and observation by several finns in the Denver metropolitan area and are not limited to the relative swell classification.. More or less damage can occur` in all classifications because of the uncertainty associated with subsurface conditions and geotechnical engineering. It is important to recite that measured ,sell or soil expansion is not the only geotecimical criteria for the type df floor and foundation recommendations. Additional criteria considered include; Sail and bedrock type and variability Stratigraphy Groundwater depth and anticipated post -construction moisture e conditions. Surface water drainage and features Post -construction landscaping and irrigation Construction details and proposed use Local experience Page 2 of3 Page 3 of3 BRACE WALLS, TOP & 80T, WEER LLSLOPED� "" �� DIKE Wl'TH . _. . _.SOD CFC F.D+ iNG 1 TOP ,C F° Ll »- ter_ W MODERATELY C�' M CONCRETE GRADE BEAM �C �. BAC ,FCS CCG ; I PPROOF`!N POLYETHYLENE GLUED TO WALL F �, F i C7I .a -.....-- ,SND ENDED ALON y THE BOTTOM OF THE 'EXCAVATION - 15# BUILD�NG FELT s r t C p4 r * '401" as 4Vf i'8. Orr UP"43k` E ER PERFORATED PPE, \"—SLOPE DRAIN P�PE 1/8" PER FOOT TO 12" IN, DAYLIGHT, OR TCS A SUMP PIT. IF `TO YLJGH , COVER ENCS WITH CREEK, AC ILL AROUND THE FOUNDATION SHOULD BE MOO T D AND COMPACTED AISI THE FINAL GRADE SHOULD BE WELL L LOtPED TO rER, AND SNOW f--'R'---C[,-UDE PONDING OF RAINFALL, IRRIGATION WAI MELT ADJACENT 'TO FOUNDATION WALLS. AUT: DO N `11- DIKE OR IMPEDE THE L WATER AWAY"" FROM FOUNDA O WAL'i..S WITH SOD, EDGING OR DECORATIVE G I OLYE'THYENE, DOWNSPOUTS AND SILL COCKS SHOULD 'DISCHARGE INTO P_.AS1,. BLO'"KS OR LONG EXTENSIONS. SIN SYSTEM BELOW AND BACKFILL DETAILS (FOR FOOTING FOUNDATION) DFS A L 1 I m VE GRAVEL AREA. \' SOIL TO BE SLOPED AWAY FROM, FOUNDAMN. L im St -OPE" I HAW M HOUSE . BEYOND THE FOUNDA-110N, 5 fc. sNl— Report 0216-023 +a2016 Yukon Report SEG 0216-023 - Page 2 DISCLAIMER The following pages summarize the heat gain and heat loss of the building using the ACOA Manual J8 calculation procedure, The calculations are based on the information given to Savoy Engineering Group in the form of drawings, sketches, and interviews. In certain cases, Savoy Engineering Group may make assumptions about design conditions that may or may not be accurate for the location of concern. It is the responsibility of the installing HVAC contractor to verify the design conditions before equipment purchase and installation. Any load calculations provided in the following pages are based upon information provided by the party submitting a particular project to Savoy Engineering Group. Savoy Engineering Group has not and does not independently verify that the data provided to Savoy Engineering Group is correct or complete, and any calculations made by Savoy Engineering Group are based upon the information provided by third parties. Savoy Engineering Group makes no claim that the information given to us is correct or complete. Savoy Engineering Group utilizes WrightSoft Residential 15.0 which is an ACOA Certified and ASHRAE recommended computer program to determine the heating and cooling loads presented in this report, and is therefore very accurate. If the information given to Savoy Engineering Group is accurate, and the building is built as per the plans submitted, then the load calculations presented in this report can be assumed to be accurate. A licensed mechanical contractor may use these calculations as a starting point in system sizing and selection. Savoy Engineering Group does not provide architectural or engineering plans or diagrams for the public or for use by contractors or construction companies as final "construction documents". Savoy Engineering Group works with architectural and engineering firms and with contractors in connection with their designs of heating and air conditioning systems, If the FIVAC duct layout installed on-site DOES NOT match the Manual D duct design prepared by Savoy Engineering Group, then Savoy Engineering Group cannot and will not guarantee the performance of any altered duct design. Final JIVAC sizing and selection should be done by a licensed HVAC contractor, Many factors beyond the scope of this report must be considered prior to final system selection and design, such as: exact equipment availability and selections, system controls and location of controls, system air distribution and cycling, Uniform Building Code requirements, Uniform Mechanical Code requirements, and many other standard design conventions as listed by the American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE). Savoy Engineering Group therefore assumes no liability for final equipment selection or final system design. Various modifications to the information provided to Savoy Engineering Group may have occurred after this Design Support information was prepared, which would require that this Design Support information be modified in order to be accurate. After reviewing Savoy Engineering Group's report, and prior to any system purchase or installation, please inform Savoy Engineering Group in writing of any changes which may alter the assumptions and calculations contained in this report. Report SEG 0216-023 — Page 3 Report SEG 0216-023 - Page 4 ACCA Certified Manual J Load Calculation — 7 fin 32,371 N/A N/ N/A - F ifina 14,033 14,033 0 13 95 OF 75 OF, 500r irgA T CAW SHR of 0.90 # The Load Analysis includes 5 people (# of Bedrooms + 1) and a 1,200 Btuh appliance load Report SEG 0216-023 - Page 5 mom Per Energy Star: • AC cooling equipment should be sized at 95-115% of Design Total Heat Gain, or the next nominal size that is available to satisfy the latent and sensible requirements. • Heat pump cooling equipment should be sized at 100-115% (cooling dominant climate) or 100-125% (heating dominant climate) of Design Total Heat Gain, or the next nominal size that is available to satisfy the latent and sensible requirements unless a larger size is dictated by the heating equipment selection. f Design Total Heat Loss, or ne • Listed Output Heat Capacity must be sized at 100-140% o nominal size unless a larger size is dictated by the cooling equipment selection -.d AED Assessment Entire House Savoy Engineering Group Phone: (801) 949-5337 Web: wwwfoal-Caiculations,corn 1;QN1 11M]WI zsmfl�r #. Hw, of Day / AEDbft Maximum hourly glazing load exceeds average by 24.8%. i I'll i "I'll - . . ED). based on AED limit of 30%. 2016 -Feb -23 11.11:05 Wright1i0ft Right -Suite@ Universal 2015 15.0,25 RSU13868 Page I Yukon AFH Lot IONYukon Plan A FH - Lot 10.rup Calc = MJ8 House Front faces: E F!oject intormation For: Yukon Grove Plan A - Farmhouse Lot 10, 3341 Yukon Ct, Wheat Ridge, CO Design Conartions Location: Indoor: Heating Cooling Denver Stapleton Int'l AP, CO, US Indoor temperature (OF) 72 75 Elevation'. 5285 ft Design TD (T) 79 20 Latitude: 40ON Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 67.6 -45A Dry bulb (OF) -7 95 Infiltration: Daily range (OF) - 27 (H Wet bulb (OF) - 59 Wind speed (mph) 15,0 T5 Testfor Adequate Exposure Diversity zsmfl�r #. Hw, of Day / AEDbft Maximum hourly glazing load exceeds average by 24.8%. i I'll i "I'll - . . ED). based on AED limit of 30%. 2016 -Feb -23 11.11:05 Wright1i0ft Right -Suite@ Universal 2015 15.0,25 RSU13868 Page I Yukon AFH Lot IONYukon Plan A FH - Lot 10.rup Calc = MJ8 House Front faces: E Job; SEG 0216-023 Component Constructions Date: Feb. 23, 2016 Entire House Sy, Tracy Savoy S4NV(jN [NAINCIRN(IGROUP Savoy Engineering Group For: Yukon Grove Plan A - Farmhouse Lot 10, 3341 Yukon Ct, Wheat Ridge, CO Walls 151313-0wc-10: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, n concrete wall, r-1 3 cav ins, 8" gypsum board int fnsh n e s w w all Yukon Plan AG Vinly Wall: Frm wall, vnl ext, 1/2" wood shth, r-8 batt ins, n r-14 spray foam ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 161, e o.c. stud s w all Yukon Plan Window Well: Concrete wall, 2"x4" wood int frm, 8" thk, r-13 n cav ins, 1/2" gypsum board int fnsh e s all Partitions V4pum board frish, 2"x6'wood frm, 16 o,c, stud Windows va I fritt m,?t. cir innr, 1/2" QaP-, 10. WKIR MON, "21100411 PRO. kaofficft"MMM - a e w all 4A5-2ov: 2 glazing, clr low -e outr, air gas, vni frm mat, Or innr, 1/2" gap, e 1/4" thk; NERC rated (SHGC=0.27); 5.5 It overhang (6 ft window ht, 2 ft sep) 216 0,045 Indoor: Heating Cooling Location: Denver Stapleton Int'l AP, CO, US 0 Indoor temperature (*F) 72 79 75 20 Elevation: 5285 ft 294 Design TD CF) Relative humidity50 2 231 Latitude: 40ON Heating Cooling Moisture difference (gr/lb) 67,6 -454 Outdoor: Dry bulb ('F) -7 95 Infiltration: Simplified 156 Daily range (*F) - 27 ( H 59 Method Construction quality Tight 0,059 Wet bulb ('F) - wind speed (mph) 15.0 7,5 Fireplaces 0 2 Construction descriptions or Area U- value Insul R Htg HTM Loss fe BuW-T fe-TOth Bktff Rub Clg HTM BuW Min Walls 151313-0wc-10: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, n concrete wall, r-1 3 cav ins, 8" gypsum board int fnsh n e s w w all Yukon Plan AG Vinly Wall: Frm wall, vnl ext, 1/2" wood shth, r-8 batt ins, n r-14 spray foam ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 161, e o.c. stud s w all Yukon Plan Window Well: Concrete wall, 2"x4" wood int frm, 8" thk, r-13 n cav ins, 1/2" gypsum board int fnsh e s all Partitions V4pum board frish, 2"x6'wood frm, 16 o,c, stud Windows va I fritt m,?t. cir innr, 1/2" QaP-, 10. WKIR MON, "21100411 PRO. kaofficft"MMM - a e w all 4A5-2ov: 2 glazing, clr low -e outr, air gas, vni frm mat, Or innr, 1/2" gap, e 1/4" thk; NERC rated (SHGC=0.27); 5.5 It overhang (6 ft window ht, 2 ft sep) 216 0,045 110 3.56 768 0 0 62 0,059 13,0 4,75 294 0.04 2 231 0.045 13.0 3,56 821 0 0 216 0D45 110 156 768 0 0 62 0,059 13.0 4.75 294 0,04 2 200 0.045 13,0 156 712 0 0 29 0,059 13,0 475 140 0,04 1 1017 0.059 13,0 333 3798 OV 5 262 0,045 22.0 3,56 930 0,75 195 192 0,045 22.0 155 684 0.75 144 419 0.045 22,0 3,56 1488 0.75 313 85 0D45 22,0 156 301 0,75 63 957 0.045 22.0 155 3402 0.75 715 91 0,077 13,0 6.08 556 OM 84 31 0.077 13,0 8.08 187 0.92 28 61 0,077 13.0 6.08 374 0.92 56 184 0.077 13.0 6.08 1117 0.92 168 364 0,068 19.0 5.37 1955 0.70 255 66 0.340 0 26.9 1773 IZO 794 20 0.340 0 26.9 537 12,0 241 40 0,340 0 26:9 1074 323 1291 25 0,340 0 26,9 672 323 807 43 0.340 0 26,9 1142 17,8 757 50 0.340 0 26.9 1343 17,8 891 20 0,340 0 26,9 537 323 646 264 0.340 0 26.9 7078 20,6 5427 30 0,340 0 26.9 806 24,0 720 2016 -Feb -2311:11:05 +wrightsoft' Right-Surte(,10 Universal 201515 0.25RSL)13868 Page I Yukon AFH Lot IoNyukon PlanA FH - Lot 10,ruP Calc -NU8 House Front faces: E 4A5-2ovd-. 2 glazing, cIr low -e oult, air gas, insulated vinyl frol mat, cir s innr, 1/2" gap„ 1/4" thk; NFRC rated (SHGC=0,27) Doors 11 DO: Door, wd sc type Ceilings 16B-50ad: Attic ceiling, asphalt shingles roof mat, r-50 cell ins, 1/2" gypsum board int fnsh Floors 19A-30bstp: Part floor, r-30 ins, frin fir, 8" thkns, 1/2" gypsum board int frish 21A -20t: Bg floor, heavy dry or light damp soil, 3' depth 21A -32t: Bg floor, heavy dry or light damp soil, 10" depth 49 0,340 0 26,9 1305 17.8 866 24 0.390 0 30.8 749 14.8 263 1293 0,020 MO 1.58 2043 1.43 1327 54 4M4 30,0 2.25 121 0,57 31 190 0,027 0 2,13 405 0 0 1071 OMO 0 1.58 1692 0 0 2016aFeb-23 1111:05 wrightSOW Flight -Suite O Universal 2015 15,0,25 RSU13868 Page 2 ... Yukon A FH Lot 10\Yukon Plan A FH , Lot 10,041) Cale = MJ8 House Front faces;. E Job: SEG 0216-023 Load Short For Date: Feb. 23, 20167 Entire House BY: Trey Savoy , �Pa s,%v(y), Savoy Engineering Group Phonc (801) 949-5337 Web: vmwtoad-Ca1Cu1afi0n$,C0u1 For: Yukon Grove Plan A - Farmhouse Lot 10, 3341 Yukon Ct, Wheat Ridge, CO Htg Cig infiltration Outside db (OF) -7 95 Method Simplified Tight Inside db CF) 72 75 Construction quality 0 Design TD ('F) 79 20 Fireplaces Daily range - H Inside humidity 50 50 Moisture difference (gr/lb) 68 -45 MINN WIN MINOR COOLING EQUIPMENT HEATING EQUIPMENT Make Trane Make Trane Trade TRANE Trade XB90 Model TUCIB060A9361A* Gond 4TTR3024G1 4TXCB03IBC3 AHRI ref 2008193 Coil AHRI ref 5593965 Efficiency 92.1 AFUE Efficiency 11.5 EER, 13.3 SEER 20700 Btuh Heating input 60000 Btuh Sensible cooling Latent cooling 2300 Btuh Heating output 56000 63 Btuh OF Total cooling 23000 Btuh Temperature rise Actual air flow 986 ofm Actual air flow 900 0,073 cfm cfm1Btuh Air flow factor O�037 cfm/Btuh Air flow factor 0,50 in H20 Static pressure 0.50 in H2O Static pressure Load sensible heat ratio 1.00 Space thermostat ROOM NAME Area Htg load CIg loadHtg AVF (cfm) 19 Gig AVF (cfm) (ft2) (Btuh) (Btuh) Master Bath 149 3212 1511 0 120 0 110 M'WIC Master Bedroom 41 186 0 2385 1316 808 89 53 96 59 Bedroom 2 110 1408 0 0 0 0 Cl 2 14 131868 0 0 0 Cl 3 Bed 3 / Study 110 1868 1282 4826 70 247 93 351 DR/GR/KlT 5 16 6606 0 0 0 0 Stairs 37 9 0 0 0 0 PNT 8 0 0 0 0 LN[} 44 934 489 35 36 0 Bath 8 0 0 0 0 Linen Crawlspace 190 1140 6 3461 325 43 129 24 Mechanicals 416 191 2880 1250 108 91 Bedroom 4 Calculations approved by ACOA to meet all requirements of Manual J 8th Ed, 2016 -Feb -23 11:11:05 Wj*i1ghtS0ft Right-SuiuA) universal 2015 15,0,25 RSU13868 Page I "Ic ... Yukon AFH Lot 10\yukon PlanA FH -Lot 10-ruP cats =W8 House Front faces: E L 4 25 0 0 0 0 Fath 2 52 414 0 15 0 Laundry 48 0 0 0 0 Stairs 2 44 0 0 0 REC Room 296 2079 579 78 42 U.Stair 18 0 0 0 0 Entire Nouse d 2522 26386 12391 986 900 Other equip loads 6485 1642 Equip. @ 1,00 RSM 14033 Latent cooling 0 TOTALS 2522 32871 14033 986 900 Calculations approved by ACOA to meet all requirements of Manual J 8th Ed. 2016 -Feb -23 11:1 1:05 wrightSClift Right-SuiteO Universal 2095 15.0.25 RSU13868 Page 2 Yukon A FN Leat 10\Yukon Alan A FH - Lot 10.rup Calc = MJ8 Nouse Front faces: P Right -JO Worksheet Entire House zz== Dh­­ 1AA41 QACLr'lq7 Wah' -I�adr.ntrwlafionsxom 2016 -Feb -23 11:11 AA_ wrightSOft- Right-Sufte,0 Universal 2015 15,0,25 RSU13W8 pag ... Yukon AFH Lot 10\Yukon PlanA Fri -Lot 10,rup Caic=Wlt House Front faces: E i Right -M Worksheet Entire House By: Tracy Savoy r .a• • •" • • _ s _• • _ ' • Job: SEG 0216-023 Right -JO Worksheet Date: Feb. 23, 2016 Entire House By: Tracy Savoy `attssx 8 ati�;asa��we,k�taa q� Savoy Engineering Group aicuiations a roved b ALGA to meet all re uirements of Manual J 8th Ed. 2016 -Fete -23 11:11:05 tatPaye Right-SufteV untrsas 2015 15.x.25 RSU13888 Yukon A FH Lot 10\Yukon Plan A FH - Lot 10.rup Cate = MJ8 Nouse Front faces: E Jab: SEG 0216-023 Right -JO Worksheet Date: Feb. 23, 2016 Entire House By: Tracy Savoy M Savoy Engineering Group CalculationRCCA to mel iuirements of Manual J 8th Ed. 2016 -Feb -23 11:11 05 t ht Flight -Suite$, Uni rsai 2015 15.0.25 RSU13868 Page 4 . Yukon A FH Lot 10\Yukon Plan A FH - Lot 10.rup Calc = mj8 House Front faces: E Right -J@ Worksheet Dai_ EG Date: Feb. 23, 2016 aiaan w assn% y�r a Entire. House By. Tracy Savoy Savoy Engineering Group Calculations approved -by ACCA to meet all requirements,of Manual J 8th Ed 2016-Feb-23 11 � 11 M A& ,, Yukon A FH Lot IOkYukon Plan A FH - Lot 10.rup Calc = W8 House Front faces: E Job: SEG 0296-023 Right -JO Worksheet Date: Feb. 23, 2096 4�� aaa a ass �d Entire House By: Tracy Savoy d� array Engineering Group Calculations aegroved by ACCA to meet all requiremen-ts of Manual J 8th Ed. 2016-Fet)-23 11:11:05 -00- wrightSOft' Right-SuiteO Universal 2015 1&0,25 R$Ul3m Page 6 Front Job; SEG 0216-023 Right -JO Worksheet Date: Feb. 23, 2015 Entire House By: Tracy Savoy ., Savoy Engineering Group ._ Page 7 i i.:Universal u. * rHouse Front Jab: SSG 0296-023 Right -JO Worksheet Date. Feb. 23, 2096 Entire House By: Tracy Savoy Savoy Engineering Group Calculations a rc ,1, d b RCCA to meet a91 re uirements of Manual J 8th Ed. aols-Feb} 2311:11 05 p htO Right-SuftoO Universal 2815 15.0.25 RSU13868 Page E ... Yukon AFH Lot 101Yukon Plan A FH - ! of 10.eup Gatc = W8 House Front faces: E AeA� Right -M Worksheet Entire House --- io— OAO AIq7 Wh --inad—d—Winnq t'.nM By: Tracy Savoy 2016 -Feb -23 11 � I I Ad&-44- WrIghtOOft- Right-SuiteO Universal 2015 15.0,25 RSU13868 Pag ... Yukon AFH Lot 10\Yukon PlanA FH - Lot 10,ruP Cale -M,18 House Front faces: E i Right -J@ Worksheet ERfre House Phone: (801) 949-5337 Web: ww.toad-calculations,com « By: Tracy Savoy ;p!1jj1!11 2016 -Feb -23 11:11 Right-Sit.SUniwls.120151,5.0.25RSU13868 Page -ton AFH Lot 10\Yukon PtanAFH -Lot 10,rup Calc=MJ8 House Front faces: E Right -JO Worksheet Entire House 'Vem ks&r,�� �71 Date: Feb.23,2016 By* Tracy Savoy ♦�# �- 0 aDlu - , - 0 a 2016 -Feb -23 11:11:05 _014- wrightsaft- Right-SuiteOr Universal 2015 15.015 RSU13868 Page 11 ."Yukon A FH Lot 10\Yukon Plan A FH -Lot 10,rup Calc - MJS House Front faces: E Right -JO Worksheet Entire House By: Tracy Savoy *13WAM'splim -11 0 AIRMITHWFUMP A NNOWE --- IR 2016 -Feb -23 1111: Aft-fid- WrIahtgOft' Right-Suiteg Universal 2015 1&0,25 RSU13868 Page , _Yukon AFH Lot 10\Yukon Plan A FH Lot 10,rup Caic-W8 House Front faces: E I Project Su ary Entire Hou smll�sl S"V eering Grou Savoy Engin Phone� (801) 949-5337 Web: vII1Cu1ati0n$,c0M Project Information For: Yukon Grove Plan A - Farmhouse Lot 10, 3341 Yukon Ct, Wheat Ridge, CO Notes: Joy Valentine Coot Sunshine Heating &Air Conditioning, Inc Design Information Outside db -7 *F Inside db 72 OF Design TD 79 OF Heating Summary 0.11 Structure 26386 Blurt Ducts 0 Btuh Central vent (91 cfm) 6485 Btuh Humidification 0 Btuh Piping 0 Btuh Equipment load 32871 Btuh Method Simplified Construction quality Tight Fireplaces 0 III'- #- It * I # Outside db Heatin? coolin Area (ft') 252 2 521 Volume (W) 14598 14598 Air changes/hour 0.11 0.06 Equiv. AVF (cfm) 27 15 III'- #- It * I # Outside db 95 OF Inside db 75 OF Design TO 20 OF Daily range H Btuh Relative humidity 50 % Moisture difference -45 gr/lb Structure 12391 Btuh Ducts 0 Btuh Central vent (91 cfm) 1642 Btuh Blower 0 Btuh Use manufacturer's data y Rate/swing multiplier 1,00 Equipment sensible load 14033 Btuh Latent Cooling Equipment Load Sizing Structure 629 Btuh Ducts 0 Btuh Central vent (91 cfm) -2304 Btuh Equipment latent load 0 Btuh Equipment total load 14033 Btuh Req. total capacity at 0.90 SHR 1.3 ton sill 'a sill 'a 2016-FebMII,1115 wrightSOft- Right-SufteO Universal 201515.0,25 RSU13M Page I Yukon A FH Lot 10\Yukon Plan A FH - Lot 10,rup Calc - W8 House Front faces: E Phone� (801) 949-5337 WW wwwload-,�alcutations.com Project Information For, Yukon Grove Plan A - Farmhouse Lot 10, 3341 Yukon Ct, Wheat Ridge, 0* Job: SEG 0216-023 Manual S Compliance Report Manufacturer: Date: Feb. 23, 2016 Actual airflow: Entire House By; Tracy Savoy SAVC)N, FNXINAIRK(j GRCX,f) Savoy Engineering Group Btuh Entering coil DB: Outdoor design WB: 59.0*F Phone� (801) 949-5337 WW wwwload-,�alcutations.com Project Information For, Yukon Grove Plan A - Farmhouse Lot 10, 3341 Yukon Ct, Wheat Ridge, 0* 9M=*zM= Outdoor design DB: -7.0°F Heat loss: 32871 Btuh indoor design DB: 72VF 110 Equipment type, Cooling Equipment Manufacturer: Design Conditions Actual airflow: 986 cfm Outdoor design DB: 95VF Sensible gaim 14033 Btuh Entering coil DB: Outdoor design WB: 59.0*F Latent gain: 0 Btuh Entering coil WB: 61 4'F Indoor design DB: 75,OOF Total gain'. 14033 Btuh Indoor RH: 50% Estimated airflow: 900 cfm 9M=*zM= Outdoor design DB: -7.0°F Heat loss: 32871 Btuh indoor design DB: 72VF 110 Equipment type, Gas furnace Manufacturer: Trane Actual airflow: 986 cfm Output capacity: 56000 Btuh 14PAtinn Fniuinrnant 9M=*zM= Outdoor design DB: -7.0°F Heat loss: 32871 Btuh indoor design DB: 72VF 110 Equipment type, Gas furnace Manufacturer: Trane Actual airflow: 986 cfm Output capacity: 56000 Btuh 111111!11111111111!1!11!1!11!1!11! 11111pr �!111 2016 -Feb -23 11:11:18 wrightSOft Right -Suit eO Universat 2015 15A25 RSU13868 Page I ... Yukon AFH Lot IMYukon Pian AFH -Lot 10,rup Calc =WS House Front faces: E "trunk Grill Htg Clg TEL Design Veloc Diam HxW Stu /Joist Duct Jame Size (in) (cfm) (cfm) (ft) FR (fpm) (in) (in) Opening (in) Mati Trunk rb2 Ox 0 373 157 121,5 0.084 475 12.0 Ox 0 ShtMetl rt1 Mt rt1 rb4 Oxo 2019 205 94,5 0.109 599 8.0 Ox 0 ShMt rt rb1 0x0 404 538 65.0 0,158 503 14,0 Ox 0 Shpt "trunk Htg Clg Design Velcro Diam H x W Duct 'hunk Name Type (cfm) (Cfm) F (fpm) (in) (in) Material rt1 Peak AVF 582 362 0.084 544 14.0 0 x 0 ShtMetl rt2 Peak AVF 209 205 0.109 599 8.0 0 x 0 ShtMetl rt1 2016 -Feb -23 91:91.18 wrightSOft Right -Suited Universal 2055 95,0.25 RSU13868 Page 2 .., Yukon A FH Lot 10kYukon Plan A FH - Lot Mots Calc = W8 Nouse Front faces: E. Job #: SEG 0216-023 * M., Yukon Grove Plan A- Farmhouse Lot 10, 3341 Yukon Ct Wheat Ridge, GO MANNINNIMI Scale: I : 81 Page I Right-Suke(D Universal 2015 1&0 25 RSU13868 2016 -Feb -23 11:12:18 I Mukon Plan A F H - Lot 10. rup #N Job #: SEG 0216-023 7—,-,fff*rm6,t, ky Tracy Sav*y-ftc, Yukon Grove Plan A - Farmhouse Lot 10, 3341 Yukon Ct Meat Ridge, CO ,• Scale� 1 :81 Page 2 Right-SuiteO Universal 2015 15,0,25 RSU 13868 2016 -Feb -23 1112:19 T1PAW," fim -1/2" 1-114" J/8" 718"DIA. HOLES ELECTRICAL CONNECTION 1-V2"DIA. HOLE GAS CONNECTION a B060 -SUB -1 • * / Horizontal Condensing + , Furnace 5/8" Single Stage ,.s • t'"DIAMETER 2'DIAMETER #UTSME AIR 1/2" -1 FLUE CONNECT ix 1-718'X 7/8" SLOT K.O. Cly B" / CONDENSATE DRAIN 7 Q Q (FOR HORIZONTAL) r `1 +q ° 0 7/8" DIA, K.O. ELECTRICAL SUPPLY (ALTERNATE) 7t8" DIA. K,O. ELECTRICAL „ SUPPLY (ALTERNATE) 1-1/2" DIA. K,O. CAS CONNECTION (ALTERNATE) 1-118" DIAKO, CONDENSATE DRAIN . Altamata II �I lil� MIII�III I Ip Ii IIV..f 'Ci •fri+'tr ` 0 1' ' 84 125 C 1160 ir. e771 'III ♦ 1102 09#f• f + ! #♦ ♦ilki 957 944 922 614�1 :.w A RISE CFM VS. TEMPERATURE Cubic Feet Per Minute (CFM) •�� N Ewe �. �� �� �� f �� III I * ,11. ��:. •. * A � � � � ... + r.... 1* TYPE Upflow / Horizontal RATINGS W input BTUH 60,000 Capacity BTUH(ICS) 56,000 AFUE 02.0 Temp. rise (Min.­Max),*F. 30-60 SLOWER DRIVE DIRECT Diameter -Width (in,) 10x7 No, Used I Speeds (No.) 4 CFM vs, in, vy.g. See Fan Performance Motor HP 1/3 R.P.M. 1075 Volts/Ph/Hz 11511160 COMBUSTION FAN - Type Centrifugal Drive - No. Speeds Direct - I Motor HP - RPM 1/55-3000 Volts/Ph/Hz 115/1/60 F.L. AME 1'0 FILTER — Furnished? No Type Recommended High Velocity Hi Vel. (No.-Size-Thk.) 1 - 17x25 - I in. VENT COLLAR -- Size in.) _,".2"Rou,nd EATEXCHAN ER Type -Fired Alum. Steel -Unfired Gauqe (Fired) 20 ORIFICES — Main Nat.Gas. Qty, — Drill Size 3-45 L.P, Gas Qty. — Drill Size 3-56 --A PICO—T 9APETY EVICE bs Hot Surface Ignition UV Multsport inshot Number POWER CONN. — WP /Hz� 115/1/60 Ampacity (In Amps) 8A Max,_• #Ln fam Qa)— PIPE CDfiLW DIMENSIONS HxWxD Crated (in,) 41- 3/4 x 19-1/2 x 30-1/2 Uncrated (to.,j 40 x 17-1/2 x _281 --- WEIGHT Shipping (Lbs.) / Net (Lbs) 150/140 Q Central Furnace heating designs are certified by the American Gas Association Inc, Laboratories. 1, Ratings shown are for elevations up to 2000 feet. For elevations above 2000 feet; Ratings should be reduced at the rate of 4% for each 1000 feet above sea level, Q'i) Based on U.S, Government Standard Tests, C�) The above wiring specifications are in accordance with National Electrical Code; however, installations must comply with local codes. NATURALGAS MODELS —Central heat- BURNERS — Multi -port, in -shot burners STYLING — Heavy gauge steel and ing furnace designs are certified by the will give years of quiet and efficient service, "wraparound" cabinet construction is American Gas Assocon for both natu- All models can be converted to L.P. gas used in the cabinet with baked -on enamel ral and L.P, gas. Limit setting and rating without changing burners. finish for strength and beauty. The heat derstandard rating conditions usin• ' • PERATIO— The Integrated System Control has solid state devices, which continuously monitor for presence of flame, when the system is in the heating mode of operation. Slow opening, dual solenoid combination gas valve and regu- lator provide extra safety and quieter o♦- eration. heavy gauge aluminized steel heat ex - outside. S=eTrane hasar>oiicyofoontVnuousproJuctandproduct data mprovement, it reserves the nght tochantiespedfica- lionsanddesignwithout notice, Trane A business of American Standard Companies www,trane,com C v b a 0 r EACAumidifier. drive blower motor, with sufficient airflow range for most heating and cooling re- quirements, will switch from heating to cooling speeds on demand from room thermostat. The blower door safety switch when the blower door is removed. (Fan dard), pletely lined with foil-taced fiberglass insu- lation. This results in quiet and efficient operation due to the excellent acoustical and insulating qualities of fiberglass. 6 the room thermostat, Complete front ser- vice access. https://wwAv.comfortsite,com/EBiz/Application/productlnfo!'Performanc... L K' 4/23/2015 High Speed --- U.S. (Englis Capacities are net in Btuh/1000 - indoor fan heat deducted Outdoor Model 4TTR3024G1 Indoor Model 4TXCB03IBC3 ARIREF 5593965 Airflow 800 Total Net Capacity 23000 Btuh Airflow 800 CFM Compressor Power 1580 watts Indoor Fan Power 292 watts Outdoor Fan Power 128 watts SEER 13.25 Correction Factors - Other Airflows 59 22,50 17.50 Airflow 700 900 Total Capacity 098 1.02 Sensible Capacity 0,93 107 Compressor Kw 0.99 "1 Rated with 25 Feet 5/8 suction 3/8 liquid lines O.D.D.B. I.D.W.B. TOTAL CAPACITY SENSIBLE CAPACITY SYSTEM 72 75 1 78 1 85 Kw 85 59 22,50 17.50 19.60 116.401 21"70 22,10 1 1.87 85 63 2150 14.30 18.50 19,901,11 1.88 E35 67 25.20 11,40 13.50 15.60 17.00 1.90 95 59 20.50 16.60 0 20.50 20,50 Ej 1.96 95 63 21.50 13.501150 17.70 19.10 1.98 95 67 23.00 10.50 12.60 14.70 16.10 2,00 105 63 19.50 12.70 14.80 16.90 18.30 2.08 105 67 20,80 9.70 11.80 1190 1530 2.10 105 71 2160 6.90 9.00 11.10 12.40 2.12 115 63 17.50 11.90 14.00 16.10 17.50 2.18 115 67 18,70 9,00 11.10 1120 14.50 2.20 115 71 2030 6.10 8.20 10,30 11.70 2.22 *** 95 59 20.50 IDDB= 75.00 1830 1.96 * * Performance at selected design conditions Dry coil condition (Total Capacity = Sensible Capacity) Total capacity, compressor Kw and app. dew point valid only for wetcoil All temperatures in Degree F 4/23/2015 8:13 AM I of I City of i jige CO MMUNITY DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033 -8001 P: 303.235.2846 F: 303.235.2857 March 25, 2015 OFFICIAL ADDRESS NOTIFICATION NOTIFICATION is hereby given that the following address has been assigned to the property /properties as indicated below: PROPERTY OWNER(S): Bill Fritz NEW ADDRESS: Wheat Ridge, CO 80033 Lot 1— 3205 Yukon Ct. Lot 2 — 3225 Yukon Ct. Lot 3 — 3245 Yukon Ct. Lot 4 — 3265 Yukon Ct. Lot 5 — 3285 Yukon Ct. Lot 6 — 3295 Yukon Ct. Lot 7 — 3311 Yukon Ct. Lot 8 — 3321 Yukon Ct. Lot 9 — 3331 Yukon Ct. Lot 10 — 3341 Yukon Ct. Lot 11 — 3351 Yukon Ct. Lot 12 — 3361 Yukon Ct. Lot 13 — 3371 Yukon Ct. Lot 14 — 3391 Yukon Ct. Lot 15 — 3360 Yukon Ct. Lot 16 — 3350 Yukon Ct. Lot 17 — 3340 Yukon Ct. Lot 18 — 3330 Yukon Ct. Lot 19 — 3320 Yukon Ct. Lot 20 — 3300 Yukon Ct. SUBDIVISION: Yukon Grove Subdivision, Filing No. 1 Jefferson County Reception Number for Plat: 2015016465 (See attachment) NOTES This is a courtesy notification. AUTHORIZED BY: I DATE: DISTRIBUTION: 1. Property Owner 2. Jefferson County Assessor, ATTN: Data Control, 100 Jefferson County Parkway, Golden, 80419 3. Jefferson County Mapping, ATTN: Addressing, 100 Jefferson County Parkway, Golden, 80419 4. Jefferson County Elections, ATTN: H. Roth, 3500 Illinois Ave., Laramie Building, Suite 1100, Golden, CO 80401 5. Email to Jeffco IT Services at smitchel@jeffco.us 6. U.S. Post Office, 4210 Wadsworth Blvd., Wheat Ridge, CO 80033 7. Email to erlinda i.martinezna,usps.g and krissy.j.summerfield(a)usps. ov 8. Xcel Energy, ATTN: Correspondence, 1123 W. 3rd Ave., Denver, CO 80223 www.ci.wheatridge.co.us 9. Century Link, Capacity Provisioning Specialist, 5325 Zuni St., Room 728, Denver, CO 80221 10. Comcast, Attn: Scott Moore, 6850 S. Tucson Way, Englewood, CO 80112 11. Consolidated Mutual Water District 12. Wheat Ridge Sanitation District 13. Wheat Ridge Fire District 14. Wheat Ridge Planning Division 15. Wheat Ridge Building Division 16. Wheat Ridge Police Department 17. GIS Specialist 18. Log File NOTE: Please notify all other parties concerned. ADDRESS MAP UPDATED BY: Vicinity Map DATE: A rd I M YUKON GROVE SUBDIVISION, FILING NO. 1 A PARCEL OF LAND LOCATED IN THE NW 1/4 OF SECTION 26, T.3S., R.69W., OF THE 6TH PM CITY OFWHEAT RIDGE, COUNTY OFJEFFERSON, STATE OF COLORADO I SHEET 02 OF 03 N00*06'22"W 359 AREA RESERVED FOR FUn R*HT-OF-A (SEE TRACT D NOTE ON SHEET AND SOOIV51: 299. EASEMENT, TYP )9oOL 0 R W1 10' x W STORMWATER EASEMENT HEREBY DEDICATED BY THIS PLAT R-2 ZONWO UWPLA 7TED a Ur4jrY AND vom" EASEMENT, lypl R4 #5 RIEW Wl CAP 4S 115721 wil STREET RIGHT-OF-WAY MONUME SHALL MoNU' &Sf; N M 70 FINAL UFT OF ASPHALT PAVEMX VLL BE PROVIDED BY THE CITY OF WHEAT ROM UPON REQUEST -Pt No 157♦9 BEKilmaK WORTH j CORNER, SECTION 2 FRO Z9 BRASS CAP ELEVATIONS ARE BASED ON THE COY OF WHWI RIDGE ON JPHAC PLS# 13212 IN RANGE BOX I A CRY ♦ WHEAT RID" 11/16 STAftESS STEEL ROD 1 2 FOOT LONG WITH SLEEVE AND DATUM ACCESS COVER, STATE PLANE COORD A1 LATN3T46`09,72O504* u ELEVATION - 54 FEET (NAVD OAT M F- LON'WIOS'04'53.207629* CITY OF WHEAT RIDGE DATUM U&S QE OFMINQ5. *70582148 E. 184+125 BEARINGS ARE BASED ON THE SOUTHERLY LINE OF THE NORTHWEST QUARTER OF SECTION 26, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PR94CPAL MERIDIAN BEAR N 89*45 ' 02 'E BETWEEN THE WEST QUARTER CORNER BEING A FOUND 3 %* ALUMINUM CAP PLS # 13212 IN RANGE BOX AND THE CENTER QUARTER CORNER SONG A FOUND 3 34 ALUMJNUU CAP PLS # 132t2 IN RANGE BOX, rl N CHAIN LINK FENCE --------- BARB #ARE FENCE PROPOSED PROPERTY LINE RIGHT—OF—WAY LINE SECTION UNE ME N mm JANUARY 22, 2015 NOVEMBER 3, 2014