Loading...
HomeMy WebLinkAbout3351 Yukon Courtu�INSPECTION RECORD 'SIF C ION ONLINE FORM: http://www.ci.wheatridge.co.us/inspection INSPECTION REQUEST LINE: (303) 234-5933 Cancellations must be submitted via the online form before 8 a.m. the day of the inspection Occulaancy/Type Inspections will not be performed unless this card is posted on the project site. **Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Initials Comments Pier Concrete Encased Ground (CEG) Foundation / P.E. Letter Plumbing Do Not Pour Concrete Prior To Approval Of The Above Inspections Underground/Slab Inspections Date Inspector Comments Initials Electrical Wall Sheathing Sewer Service Mid -Roof Plumbing Do Not Cover Underground or Below/In-Slab Work Prior To Approval Of The Above Inspections Rough Inspections Date Inspector Initials Comments Wall Sheathing Mid -Roof Lath /Wall Tie Rough Electric Rough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw / Nail Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing L j P0 cN f Com Final Mechanical JI?j e0 Ai (J(,tu Roof j O �j�n Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. *For low voltage permits — Please be sure that rough inspections are completed from the Fire District and electrical low voltage by the Building Division. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Prote R` T. ,-, ';arta 7rc,,,- —he Alea1h, t1 - The City of Wheat Ridge � Third Party For Check LiftI 1A Property Address Permit Number Z o�' Permit Issued Date°"' Owner Information Property Owner Information Property Owner Address s1r.. laeo.. •--- Inspector Information Inspection Company I Inspector Name Inspector Contact info. Inspector Statement and Acknowledgement * I Nearby acknowledge the roof I am inspecting is 6/12 or over. All roofs that are under 6112 must be inspected by the City of Wheat Ridge Buiding Dept. * I hearby acknowledge the roofing system for the referenced building has been inspected and found to be in compliance with the minimum requirements of the 2012 IRC and 2012 IBC as well as all City of Wheat Ridge Policies and Procedure and Manufacturer's recommendaqhs and specifications. Inspector: date: -- Property Owner Statement of Acknowledgement *1 hearby acknowledge that I am the owner of the building referenced above and I give -my consent for the listed third -party inspection company to perform my roof inspection in lieu of the City of Wheat Ridge Building " ivision inspection. P'ropery Owner/Agent:_ Date: lO —) 13 -7 C 1 This original document and pirmit car as well as the roofing check list, must be submitted tc the Chief Building Official withi seven days of the final inspection. Drop off in person Permit counter 2nd floor 7500 W. 28th Ave Wheat Ridge CO 80033 Draft Date: 7/26/17 Please add note to reverse side Roof Inspection ❑ N/A ass ❑ Fail ❑�N/A I 1 Pass I❑ Fail ❑ N/A ass Fail ❑ N/A ass ❑ Fail ❑ Pass ❑ Fail t❑ N/A ❑ N/A ❑ NIA ❑ N/A N/A ❑ N/A ❑ N/A ❑ N/A ❑ N/A ❑ N/A ❑ N/A /A ❑ Pass ❑ Pass 19_16ss ass Pass [4.5s ❑ Pass 94ass Pass Pass Pass Pass , { ass ❑ Pass ❑ Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail ❑ Fail N/A ❑ Pass ❑ Fail I N/A ❑ Pass ❑ Fail ❑ N/A E-4/pass ❑ Fail ti Pass Fail �N/9 ❑ /A ❑Pass ❑Fail �tal Roof Shin ❑ NIA 55 ❑Fail X ❑ N/A The City of Wheat Ridge l nspeeti9rv, Check -List. notes Mid -Roof Structural roof components Verify that no more than 2 layers of shingles exist Flashing for roof and walls If new sheathing is installed verify that it is listed in the permit description (Valuation must be adjusted) Verify sheathing nail pattern (See Policy & Procedures) Crickets and saddles where needed Verify B vent must have boot same gauge as pipe Verify vent caps Verify no flashings are damaged or rusted Step flashing shall be min. of 4x4 piece per shingle Verify scuppers allow for proper drainage lee and water shield 2' in heated wall spaces Underlayments must follow 2012 IRC / 2012 IBC Verify roof slope for proper drainage Dripedge shall have min of 2" overlap Dripedge should extend down min 2" past roof deck Dripedge shall be mechanicaly fastened 12" OC 90 LB roll roofing shall not be applied to roof slopes less than 2:12 slope: Exception, detached garages, patios, carports, open on three sides with min. slope of 1:12 Modified Bitumen, EPDM, TPO min slope 1/4:12 slope Above roof insulation R-25 Below roof residential R-38 Below roof commercial R-32 Modified Bitumen, EPDM, TPO min slope 1/4:12 slope must be installed in accordance with the manufacturers specifications- Must have manufactures letter of warranty with the address on the letter for final inspection Metal roof shingles shall not be installed on slope less ❑ Fail etal valley flashing shall be the same material as roof Fail Metal valley flashing shall extend a min of 8" from the centerline with a min. of 3/4 " high splash diverter rib built-in at the flow line with sections overlapping a a min. of 4" Clay and concrete tile shall have a min. 2-112:12 slope Slopes 4:12 and under require double underlayment The City of Wheat Ridge I nspectiqn, Gheck" Ust,p otes Mid -Roof Notes Company Name: �"J", L.W, Inspector signature: :Z4%.,// Date of Inspection: The City of Wheat Ridge Inspection Check List notes Final Roof Roof Inspection ❑ N/A Pass ❑ Fail /A ❑ Pass ❑ Fail Structural roof components ❑ N/A ass ❑ Fail Verify that no more than 2 layers of shingles exist ❑ N/A Pass ❑ Fail Flashing for roof and walls ❑ Pass ❑ Fail If new sheathing is installed verify that it is listed in the permit description (Valuation must be adjusted) [�K;A ❑ Pass ❑ Fail Verify sheathing nail pattern (See Policy & Procedures) ❑ N/A mass ❑ Fail Crickets and saddles where needed ❑ N/A ,Pass ❑Fail Verify B vent must have boot same gauge a5 pipe ❑ N/A [t ' Pass ❑ Fail Verify vent caps ❑ N/A ],,-ass ❑ Fail Verify no flashings are damaged or rusted ❑ N/A uYass ❑ Fail Step flashing shall be min. of 4x4 piece per shingle N/A ❑ Pass ❑ Fail Verify scuppers allow for proper drainage ❑ N/A E-er_pass ❑ Fail Ice and water shield 2' in heated wall spaces ❑ N/A L41 Pass ❑ Fail Underlayments must follow 2012 IRC / 2012 IBC ❑ N/A Pass ❑ Fail Verify roof slope for proper drainagez- ❑ N/A [:4'Pass ❑ Fail Dripedge shall have min of 2" overlap ❑ N/A [�11Pass ❑ Fail Dripedge should extend down min 2" past roof deck ❑ N/A (k Pass ❑ Fail Dripedge shall be mechanicaly fastened 12" OC Elj,j/A ❑ Pass ❑ Fail 90 LB roll roofing shall not be applied to roof slopes less than 2:12 slope; Exception: detached garages, patios, carports, open on three sides with min. slope of 1:12 ❑ZN /A El Pass (❑ Fail Modified Bitumen, EPDM, TPO min slope 1/4:12 slope aN/A ❑ Pass ❑ Fail Above roof insulation R-25 ❑ N/A E�/Pass ❑ Fail Below roof residential R-38 ❑,NJA ❑ Pass ❑ Fail Below roof commercial R-32 [4-�;A ❑ Pass ❑ Fail Modified Bitumen, EPDM, TPO min slope 1/4:12 slope must be installed in accordance with the manufacturers specifications - Must have manufactures letter of warranty with the address on the letter for final inspection iVletLRoof Shingles Requirements ❑��,, ❑ ass ❑ Fail Metal roof shingles shall not be installed on slope less 3:12 ❑ ❑ Pa ❑ Fall Metal valley flashing shall be the same material as roof ❑ N/A ❑ Pass ... n,_ ,_ Fail Metal valley flashing shall extend a min of 8" from the \ \ centerline with a min. of 3/4 " high splash diverter rib built-in at the flow line with sections overlapping a r a min. of 4" TiWRoofs Requirements ❑ /A ❑ Pastes' ❑ Fail Clay and concrete tile shall have a min. 2-1/2:12 slope Slopes 4:12 and under require double underlayment The City of Wheat Ridge Inspectio�a--Check Lisp notes Fina( Roof f Notes Company Name: Inspector signature: Date of Inspection: in `' !�-,- 1�9-'" _ City of Wheat Ridge Residential Roofing PERMIT - 201705696 PERMIT NO: 201705696 ISSUED: 08/08/2017 JOB ADDRESS: 3351 Yukon CT EXPIRES: 08/08/2018 JOB DESCRIPTION: Residential Re -roof to install Owens Corning Laminate asphalt shingles with ROOF DECKING - 28 *** CONTACTS *** OWNER (303)242-2792 BUNKER JUSTIN SUB (303)917-0628 Bob Schneider 160147 New Vision Roofing & Ext. *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 10,430.00 FEES Total Valuation 0.00 PAUD Use Tax 219.03 Permit Fee 220.15 * * TOTAL * * 439.18 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. t 1 , City of Wheat Ridge ®- Residential Roofing PERMIT - 201705696 PERMIT NO: 201705696 ISSUED: 08/08/2017 JOB ADDRESS: 3351 Yukon CT EXPIRES: 08/08/2018 JOB DESCRIPTION: Residential Re—roof to install Owens Corning Laminate asphalt shingles with ROOF DECKING — 28 I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of theproperty and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed an 5kNt all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of O*rNER or CONTRACTOR (Circle one) Date 1 1, This permit was issued based on the information provided in thepermit application and accompanying Flans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2, This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original_permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable: rpa�nyy ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. jam■ rd_-7r0%�q Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Dan Schultz e_�% A) From: no-reply@ci.wheat ridge.co.us Sent: Tuesday, August 1, 2017 9:07 AM To: CommDev Permits Subject: Online Form Submittal: Residential Roofing Permit Application Categories: Gina f� Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE n AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those c4 documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email Address 3351 Yukon Ct7)L Justin @ Chelsea Bunker 3032422792 JUSTINM.BUNKER @GMAIL.COM Do you have a signed contract to reroof this property? It will need to be provided at the time of permit pick-up. Attached Copy of Contract Yes Field not completed. CONTRACTOR INFORMATION Contractor Business Name Contractor's License Number (for the City of Wheat Ridge) Contractor Phone Number New Vision Roofing @ Exteriors 1601475S 1'�)L _ 3039170628 Contractor Email Address newvisionroof@gmail.com Retype Contractor Email newvisionroof@gmail.com Address DESCRIPTION OF WORK Are you re -decking theYes roof? Description of Roofing OC laminated comp shingle Material Select Type of Material: Asphalt If "Other" is selected Field not completed. above, describe here: How many squares of the 28 material selected above? No Does any portion of the property include a flat roof? If yes, how many squares on the flat roof? TOTAL SQUARES (pitched + flat) of all Field not completed. 28 ✓ 2 roofing material for this proj ect Provide additional detail Pitch is 8/12 here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract 10,430.00 value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant New Vision Roofing @ Exteriors Email not displaying correctly? View it in your browser. 3 new vision RC L?FI NG & EXTE R10RS To: CHELSEA & JUSTIN BUNKER 3359 Yukon Ct. Wheat Ridge, CO 303-506-3326 / 303-242-2792,- This 03-2422792 This proposal valid for Remove Existing Roofing material. Inspect all decking for rotted sheating and nailability. Install Ice & water shield on Eaves & Valleys for Ice and Snow damming protection. (CODE) Install FelTex Premium 30# Synthetic Underlayment to appropriate codes. uate 0/L 1/LU I / Mailing Address: 7380 W. Calahan Ave. Lakewood, CO 80232 (303)917-0628 Office (303)988-0877 Fax NewVision Roof0Q rrail.com Rep: 113ob Schneider Inspect all cover flashings and replace as needed. _ Install prefinished step -flashings to roof to side wall areas Color: _ Install new low profile vents (painted to match) Install Owens Corning Duration Designer Color Dimensional Shingles (Same Color as Existing) 11,130.00 POSSIBLE SUPPLIMENTS NEEDED: Double carry shingle tear off on South Slope. $25 X 12SQ= 300.00 ALL OTWR RSPALW ARS TO 8SD0JVWA2FJWVJWCSALL0WRi dW DISCOUNTI (1,000 00) Full Quality Control inspections by ,production staff during job process UPGRADE TO PREMIUM OC DURATION CLASS 4 IMPACT STORM SHINGLES $11,130.00 Your Roofing Project Includes: Removal of existing roofing, inspectfor rotted sheeting, disposal of all debris, new underlayment's, factory cut starter, closed valleys to code, Drip Edge (baked enamel finish) to the entire perimeter, "High wind" nailed shingles, new pipe jack flashings, low profile vents (painted to match), all required licensing and insurance, and our robust "S year Customer hist Satisfaction Guarantee" for a worryfree project we can all be proud of. Any roof sheeting requiring replacement will be billed at $ 55 per sheet extra. Down Payment 50% s 5.215.00 Completion Day Payment 50% S 5,215.00 +permit fee Acceptance of Proposal: Total $10,430.00 $10,430.00 Date: f Date City of Wheatjdge COMMUNITY DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2846 F: 303.235.2857 DATE: February 6, 2017 TO: Accounting Department FROM: Meredith Reckert, Senior Planner SUBJECT: ESCROW REFUND/RELEASE Request for Release Reimbursement requested for funds for in the amount of $11,500.00 (Eleven thousand five hundred dollars and no cents) being held for landscaping for property located in the Yukon Grove Subdivision generally located at 32"d Avenue and Yukon Court. Please note that the requested amount was provided in separate payments submitted at various times for a total of $11,500 (see attached). The landscape improvements have been completed to the City of Wheat Ridge's satisfaction. MAKE PAYMENT TO: SEND TO: Yukon Grove, LLC Yukon Grove, LLC P.O. Box 102563 Denver, CO 80250 Meredith Reckert for Ken Johnstone Director of Community Development www.ci.w heatridge.com s Meredith Reckert From: Jackie Kowal <Jackie@nicholascustomhomes.com> Sent: Thursday, January 5, 2017 2:17 PM To: Meredith Reckert; Tammy Odean Subject: Escrow refunds for Yukon Grove Follow Up Flag: Follow up Flag Status: Flagged Hello Meredith, Could you please process the refund of the escrow for the following addresses. I believe they are all complete. 3320 Yukon (1500) •3350 Yukon (15 00) -3360 Yukon (1500) 3330 Yukon (1500) 3340 Yukon (15 00) 3351 Yukon (1500) 3205 Yukon (1000) 3341 Yukon (1500) Jackie Kowal Accounting Manager Nicholas Custom Homes Inc. Mailing address: PO Box 100068 Denver CO 80250 4201 E Yale Av, Unit B 13 5 Denver CO 80222 303-953-9525 ofc 303-828-8985 cell iackie(anicholascustomhomes.com invoicesnnichol ascustomhomes. com 1 A B C D E F G H I Landscaping Escrow Log AddressI 2 83 3869 Tabor Court Developer Stan Pac Date Received 2 52016 Amount 51000.40 Expiration Date 0601-2016 Amt. Released Released Date Remarks 84 3860 Tabor Court Stan Pac 02'12'2016 SL000.00 06'012016 85 10100 W. 38th Avenue ]4CG MominaStar 02192016 S 27.090.00 09'01'2016 S 27.090.00 08 03'2016 landscaping, arlan lot curb 86 3223 Jellison Biran-Morrison02252016 51.500.00 06'012016 s1.500.00 10132016 front vardlandsc in S7 5750,5760, 5780, 5790 W. 39 Incamation 02'25 2016 511,343.40 0601 '2016 512:833.00 1221-2016 landscaping around units 88 3869 Taft Stan Pac 03'18'2016 1 51:000.00 06'012016 front yard landscaping 89 7340 W. 44th Avenue BC Builders 03'182016 5 125.348.71 09012016 S 125348.75 05 272016 all landscaping 90 3440 Quail Court Quail Hollow- 04 04'2016 51,500.00 0,6012016 front yard landscaping 91 3225Yu1<onCourt Yukon Frove 05032016 51.500.00 06'01'2016 511500.00 09162016 front yard lands raping 92 3371 Yukon Court Yukon Grove. LLC O5 '03 2016 51,500.00 06012016 51:50000 09 16 2016 front yard landscaping 93 3321 Yukon Court Yukon Grove, LLC 04 122016 SI,500.00 06'01 `2016 S1.500.00 06 28°2016 front yard landscaping 94 3311 Yukon Court Yukon Grove, LLC 51,500.00 06 282016 landscaping 95 4110li ham William Powell 05 132016 1 51,000.00 06 30'2016 S 1000.00 0' 012016 front yard landscaping 96 3250 Iris Court Loumar Enterprises 05 27 2016 52,400.00 07 31 2016 front and side yard landscaping 9' 3391 Yukon Court 06'02'2016 51500.00 08 012016 $1.500.00 09 162016 front yard landscaping 98 InCamation InCamation 06092016 523.16;.00 09012016 523.16.00 12 -212016 trail desigan and construciton 99 3205 Iris Court Loumar 05 '312016 52,000.00 08312016 52,000.00 09 09'2016 [landscaping, - comer lot 100 3330 Yukon Corot / Yukon Grove, LLC 09'162016 51.500.00 10312016 101 3340 Yukon Court Yukon Grove, LLC 09'16'2016 51,500.00 10'31'2016 102 3341 Yukon Court Yukon Grove, LLC 09162016 51500.00 10312016 103 3331 Yukon Court Yukon Grove, LLC 06 30 2016 SI.50O.00 OS 012016 51,500.00 09 16 2016 104 3351 Yukon Court ^ Yukon Grove, LLC 10 712016 SI,500.00 04 30 201' 105 3350 Yukon Court- Yukon Grove. LLC 1102 2016 51.500.00 04 30 201' 106 3360 Yukon court ..— Yukon Grove. LLC 1102 2016 91,500.00 0.1'30 7017 107 3840 Tabor Court Stan Pac 11 16 2016 S1:000.00 04%30 2017 108 11305 W. 33rd Quail Hollow 11 '22 2016 550090 04 302017 front vard sod 109 11355 W. 33rd Quail Hollow- 1122'2016 5500.40 04 302017 front yard sod 110 3320 Yukon Court " Yukon Grove, LLC 11'232016 51,500.00 04 30'2017 front yard landscaping 111 3350 Quad Quad Hollow 1230'2016 5500.00 0430201' sod 112' 113 114 115 116 Meredith Reckert From: Jackie Kowal<jackie@nicholascustomhomes.com> Sent: Thursday, January 5, 2017 2:17 PM To: Meredith Reckert; Tammy Odean Subject: Escrow refunds for Yukon Grove Follow Up Flag: Follow up - Flag Status: Flagged Hello Meredith, Could you please process the refund of the escrow for the following addresses. I believe they are all complete. 3320 Yukon (1500) 3350 Yukon (15 00) •3360 Yukon (15 00) 3330 Yukon (1500) 3340 Yukon (1500) 3351 Yukon (1500) 3205 Yukon (1000) 3341 Yukon (1500) Jackie Kowal Accounting Manager Nicholas Custom Homes Inc. Mailing address: PO Box 100068 Denver CO 80250 4201 E Yale Av, Unit B 135 Denver CO 80222 303-953-9525 ofc 303-828-8985 cell i ackiena,nicholascustomhomes. com invoices &nicholascustomhomes.com 1 V City of ar r Ae _j �COMMUNiTy DEVELOPMENT City of Wheat Ridge Municipal Building January 23`d, 2017 Owner/Occupant 3351 Yukon Ct. Wheat Ridge, CO 80033 7500 W. 291h Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2855 F: 303.237.8929 RE: Previously permitted project plans available for retrieval — Permit 201600309 (New Single Family Home) Owner/Occupant, This letter is being sent to you because a project for which a permit was issued by the City of Wheat Ridge Building Division and plans and/or other documents were required was recently completed and approved. In accordance with the Building Division's document retention policy, the associated pians and/or other documents are scheduled for disposal. We are writing to offer you an opportunity to retrieve those approved pians and/or documents prior to their disposal by the Building Division. The plans and/or documents are available for retrieval for a period of 20 working days (4 weeks) from the date of this letter and must be retrieved in person at the Building Division offices. This letter must be presented at the time of retrieval of the plans and/or documents. Plans and/or documents available for retrieval CANNOT be mailed and plans and/or documents will NOT be available for retrieval after the expiration of the retrieval period, which is 60 days from the date of this letter. You may retrieve plans and/or documents between the hours of 7:00 a.m. and 5:00 p.m., Monday through Friday, at the Building Division offices located at 7500 W. 29' Avenue in Wheat Ridge. Cordially, Melissa Mackey Senior Pennit Technician 7500 W. 29th Avenue Wheat Rid �, CQIQmdQ 8001 Office Phone: 303-235-287 Fax: 303-237-8929 City of hGat j `�,e �C,0,.MUMTY DEVELOPMENT 4 2 - C �, I �-,00�3N INSPECTION RECORD INSPECTION REQUEST LINE: (303) 234-5933 Occupanc�ype Inspections will not be performed unless this card is posted on the project site. Call the inspection request line before 11:59 p.m. to receive an inspection the following business day. Inspector Must Sign ALL Spaces pertinent to this project Sewer Service (Underground) Foundation Inspections Date Inspector Comments Initials Water Service (Underground) Plumbing (Below/ In -slab) Monolithic Slab Reinforcement Heating (Below / In -slab) Caissons to -(e-7 L- Concrete Encased Ground (CEG) Roof Sheathing Footing/Stemwall P.E. Letter pill Do Not Pour Concrete Prior To ADaroval Of The Above Insaections Underground/Slab Inspections Date Inspector Initials Comments Electrical (Underground) Comments Sewer Service (Underground) Water Service (Underground) Plumbing (Below/ In -slab) , c -1 v, -t j6 Heating (Below / In -slab) Final Mechanical Do Not Cover Underaround or Below/in-Slab Work Prior To ADDroval Of The Above Insaections Rough Inspections _ Date Inspector Initials Comments Wall Sheathing Final Plumbing , c -1 v, -t j6 .j L/ Final Mechanical to -(e-7 L- _ --� Roof Sheathing pill Final Building / Frame Lath / Wa!I Tie 63 c,( Rough Flectric Landscaping & Parking / Planning Dept. /0—/' Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For firs: inspections contact the Fire Protection District for your project. Rough Plumbing (� . /� ---� w ,� N w Rough Mechanical Gas Piping jSE j Do Not Proceed Without Approval Of Above Rough Inspections Rough Framing y • 16 •4- Insulation -- Drywall Screw.i Nail Final inspections Date Inspector Comments Initials Final Electrical iu'�;, '( Final Plumbing , c -1 v, -t j6 .j L/ Final Mechanical to -(e-7 L- Roof pill Final Building / Frame Landscaping & Parking / Planning Dept. /0—/' Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For firs: inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. ;r- Fire Inspection / Fire Protection Dist. "Note: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather m O M O O �—I O N N a "1 (1) M O O x 00 E-+ O rn U N � W O Q O FI ,n E4 W y m m A 0 ro m m J ro •M N m C b 7 � N w O Z m H m U 9 O y _ p � O t, a � o a U 01 2 N b N O p a ri U y u ° A0 N m g ro w s W m 0 b1 w 7 m u u '� •''{ x w H a d a m U 4, o m u p W O H W q p u ( m l ro N y U 0 m A ro A o m y y1 3 u o U m �� A N 3 r H U a 0 o m O id u Ll p ro m Q o m0 0 4) 0 N v m 0 p -' 0 A W o ,� x V .0 rl H -P V}O b 0 N oo a N r4 O c p° 0'0 N z A va s m O p A M L 3� w ro a m V o m N O T Z E N H U a O N m u X z m m � u N >�• 6.1 a w Z m o q ,by j y N Z ul m B 9 Q o •.V/ F H b G W W E N m ro F o OU a a W 0 q p O a N k 0 V U a� a to 9 H b1 b r --i �Q W C! U W m 0 y A a ri C Hba 41 U 0 U U Q1 0 O cd W w A U 4 U 0 0 a� f4 0 41 s4 -P to q .a RC U) q 0 N El I City of Wheatid _ge COMMUNITY DEVELOPMENT Landscape Escrow Agreement This agreement made this 11`h day of October, 2016, by and between the City of Wheat Ridge and Yukon Grove, LLC for escrow in the amount of One thousand five hundred dollars and zero cents ($1500.000 being held by the City of Wheat Ridge until landscaping is competed at 3351 Yukon Court In the event that front yard landscaping by April 30, 2017, the City of Wheat Ridge or its designee shall have the right to enter upon said property to construct and/or install such improvements or do other such work to accomplish that purpose as may be necessary, provided that the City of Wheat Ridge shall first give notice in writing to the property owner of its intent to do so. If the City of Wheat Ridge exercises its right to perform work of any nature, including labor, materials and use of equipment either by force account or contract, the City shall have the absolute right to withdraw the escrow funds to complete said improvements. The only precondition to the City's right to withdraw the funds for this purpose shall be a letter from the Community Development Director, stating that the improvements have not been completed or provided and that the compliance date of April 30, 2017, has expired. Approved and Agreed: General Contractor: /0 __// /c Date Signature Print Name Business Address / Phone Citv of Wheat Ridp-e, Colorado By: Date: Title This agreement made this I I'h day of October, 2016, by and between the City of Wheat Ridge and Yukon Grove, LLC for escrow in the amount of One thousand live hundred dollars and zero cents ($1500.000 being held by the City of Wheat Ridge until flandscaping is competed at In the event that front yard landscaping by April 30, 2017, the City of Wheat Ridge or its designee shall have the right to enter upon said property to construct and/or install such improvements or • other such work, to accomplish that purpose as may be necessary, provided that the City of Wheat Ridge shall first give notice in writing to the • owner of its intent to do so. If the City of Wheat Ridge exercises its right to perform work of any nature, including labor, materials and use of equipment either by force account or contract, the City shall have the absolute right to withdraw the escrow funds to complete said improvements. The only precondition to the City's right to withdraw the funds for this purpose shall be a WA& om t 16 ommiW6 Deviliment Director, itki that imorovements have not 101kMIK41NIIJU( g-mmou""Llf 11 General Contractor: a= Business Address I Phone Date Title = Mi By: Title: Date: City of Escrow/Letter of Cred rWheatM e ittal Sheet comp I Transmi COMMUNrry DEvaopmEw i An escrow agreement has been executed for front yard landscaping at INIM The escrow shall be held by the City as reimbursement to offset cost to City for completion of site work. Notes: Name Date ► GROVE, LLC City of Wheat •s- 1. Type Reference 10/10/2016 Bill 3351 ESCROW LNDS 5997 10/11/2016 Original Amt. Balance Due Discount Payment 1,500m 1,500M 1,500m Check Amount 1,500.00 Redstone Bank - Con 3351 YUKON ESCROW FOR LANDSCAPING 1,500. DosseylSudik STRUCTURAL ENGINE E RS September 21, 2016 Yukon Grove, LLC Mr. Bob Nettleton P.O. Box 102563 Denver, CO 80250 RE: Structural Analysis Yukon Grove Subdivision Wheat Ridge, CO Plan A — Including the following addresses 3320, 3330, 3340, 3341, 3351, & 3360 Yukon Ct. Dear Mr. Nettleton; At your request, this office performed a structural analysis for the above listed residence. The purpose of the analysis was to review and provide recommendations for the conditions described below. The pertinent information regarding the analysis is as follows: POST CAP MODIFICATION It has come to the attention of this office that the front porch beam to post connection was modified to be a concealed connection. The two 4x8 beams were mitered over the 6x6 post. Leger loks were installed through the post and into each of the beams. Analysis by this office shows that the existing condition is structurally acceptable to support the applied loads. No modifications are required. Please contact our office if we may be of further assistance. Sincerely, Jamie Doerr Project Manager O L ICF o`' tis q4• Dp tc` V ;.��0 Ss; .• O 37653 Dave Dossey, P.E. Principal 6.• AL 6025 S. Quebec St., Suite 375 Centennial, Colorado 801 1 1 303.996.0208 303.477.5680 PlawrefMit # Pkn Revfew r-ee- Sudfing Perrriit Application cm, P100" 00mPlOte all highlighted areas on both Sidesof ggs, Mailing Address: (if dftrent than property address) im city, state, zjr)-* ,Arch kecVEngin- o , �jPhone; 170S -776 - 02OF Contractor. - Contractors City License Phone: Electrical: W.R. City Ucense# 0 0 m- S, L Mechanical: W.R. City License # WW OWN Complete A information on BOTH sides of this form M- +► a • • .ter COMMERCIALNEW IfEW RESIDENTIAL STRUCTURE COMMERCIAL ROOFING COMMERCIAL ADDITION RESIDENTIAL ROOFING RESDENTIAL ADDITION WINDOW i M REPLACEMENT COMMERCIAL ACCESSORY (Garage, shed, deck, etc,) RESIDENTIAL ACCESSORY STRUCTURE MECHANICAL SYSTEM1,APPLIANCE REPAIR or REPLACEMENT PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT ELECTRICAL SYSTEWAPPLIANCE REPAIR OTHER a FULF ti AmpsF squares M Protect - t t ttW proposedOWNEWCONUACTOR SIGNAWRE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances by this permit application are accurate and do not violate applicable ordinances� regulations of the City of Wheat w allegations # . accurate; that I have t #rs by Cll conditionsand that responsibilitycompliance legalwith applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal own or have been authorized by the he property to perform the described authorized by . legal owner of any entity Mapplication CIRCLE -ONE (OWNER) (CONTRACTOR) ar REPRESENTATIVE) of (OJUVF--R (CON'T Received NotRequiteciP t ,d Not w.a .t MINMEM Address: Zoning: Lot Size:mm 3 9 (v sq. ft. Lot Width: ft. Property in the flood plain? WAD Ifyes, add surveying condition FLD. Type of project (applicable survey conditions in parenthesis): Maximum Lot Coverage: A010- % 1�i944'—I'JSID q - ft. s Existing Improvements: Proposed Improvements: House- sq. ft. House/addition: sq. ft. Shed: sq. ft, --- Shed: sq. ft Detached garage: __ sq ft. Detached Garage: sq. ft. Other: sq. ft. Other: sq. ft. Total Existing sq. ft Proposed+Exi sting sq. ft Lot Coverage % Lot Coverage 2- L 7 % Required Setbacks: FR _JL_ S 5 S -.-5—,R Provided Setbacks: FR - S ILI I' S -- I R For additions or new construction, is the structure within 2 feet of minimum setbacks? If yes, add surveying condition FND. Maximum Height: ft. Maximum Size: sq. ft. Proposed Height: ft. Proposed Size-, sq. ft. Parkland: If the permit is for new construction, have parkland dedication fees been paid? If no, add condition PFEE, notify owner, and notify building division, Strectscape: Does the permit result in any of the following conditions'? LJ Construction of new roads Ll Platting of new lots Ll dew development LJ Additions that increase floor area by 60% or more (see formula) (proposed floor area — existing floor area ) / existing floor area ....... = -I-,,--.--,---,% inc. If any box is checked.. SF/DUPLEX—Is there existing Ll Curb Cl Gutter L15 -foot sidewalk adjacent to the property? If curb, gutter or sidewalk is missing, streetscape construction or fees -in -lieu will be required. MULTIFAMILY—Does the frontage meet current city standards? If not, street cape construction or fees -in -lieu will be required. Fees -in -lieu, qf'dedication or construction are due at the time the permit is issued. & City of SINGLE FAMILYIDUPLEX 'Wh6atf),J�dgc PUBLIC WORKS BUILDING PERMIT APPLICA TION REVIEW Date: - Location: ATTENTION: BUILDING DIVISION I have reviewed the submitted application documents to construct a located at the above referenced address. Please note the comments checked below. I Drainage - a. Drainage Letter & Plan required: Yes No b. Site drainage/grading plan have been reviewed and are: O refer tipu tt� stipulations. ht tons.. 2 -A/ Public Improvements required & to be completed with project: a. street paving/patching- Yes No Completed _ b. curb & gutter: — Yes No _ — Completed c, sidewalk: Yes No Completed — d. Other (specify), — Yes --A/ — No — — Completed For items not constructed, the amount of funds taken in lieu of construction: 3, t/ Does all existing roadway/alley R.O.W. meet the standards of the City: _,�_ Yes No If not, what is required? If R.OWis required, has the deed been received- Yes No (see Note below) 4, APPROVED: The Public Works Department has reviewed the submitted material and hereby approves this PermitApplication, subject to the stated requirements and/or attached stipulations. 5. t�A NOT APPROVED: The Public Works Department has reviewed the submitted material and does not approve this Permit Application for the stated reason(s): Signature Mark Van Nattan 6. 1— Stipulations: ME 7. -.V/— A Drainage Certification Letter accompanied by As -Built plans from the Engincer-of-Record shall be required prior to the issuance of the Certificate of Occupancy. 8. NOTE: ANY DAMAGE TO EXISTING PUBLIC rmPROVEMENTS AS A, RESIA,TOF PROJECT CONSTRUCTION SHALL BE REPAIRED PER. ROW CONSTRUCTION PERMIT PRIOR, TO THE ISSUANCE OF T14E CERTIFICATE OF OCCUPANCY. MMIMM City C)f '_�Wh6atR.Ldge LIC WORKS City of Wb at Ridge Municipal Building 7500 W, 29x` Ave, Vrheat Ridge, CO 80033-8001 P-1303,235,2861 F" 301235,2857 Date: _0PA2P__ Location of Construction, Purpose of Construction: Single Farnily X_ Commercial Multi -Family (Required of all projects for document processing) ........ __'_ $50.00 * Review of existing or minimal technical documents: ..... ....... $200.00 # Initial review'of teclinical civil engineering documents (Fee includes reviews of the l" and 2 d subrnittals):_......... $600.00 * Traffic Impact Study Review Fee: (Fee includes reviews of the I" and 2nd submittals): ............. $500.00 v Trip Generation Study Review Fee: ...... - .............. $200.00 0 0 & M Manual Review & SMA Recording Fee..,. ......... ........ ......... $100.00 1 Each Application will be reviewed by staff once and returned for changes. If after review of the second submittal changes have not been made to the civil documents or the Traffic Study as requested by staff, further reviews of the Application will be subject to the following Resubmittal Fees: a Resubmittal Fees: 3'd submittal initial review fee): ......... ­ ....... .............. ....... $3K00 4'h submittal (full initial review fee): ..................... ............ ........... $600A0 All subsequent submittals: .,,. ........ ...... $600.00 (Full initial review fee) TOTAL REVIEW FEES (due at time of Building Permit issuance): h PLEASE NOTE '7 HA ADDITION TO THE ABOVE FEES, THERE WILI� BE ADDITIONAL LICENSING AND PERMITTING FEES REQUIRED FOR CONSTRUCTION OF IMPROVEMENTS WITHIN PUBLIC RIGHT-OF-WAY, Cil} (,-)I, Wh6w l trus t I C W 0 R KS �gc City of Wheat Ridge Municipal Building 7500 W.2 " Ave, Wheat Ridge, € O 0033-8001 : 301235.2861 F: 303.235.2857 NOTIFICATION FOR PUBLIC IMPROVEMENTS RESTORATION DATED: ADDRESS: Dear Contractor: In conjunction with the approval of the building it application for the above referenced address, this letter is to inform you that all existing public improvements located along the frontage sof said address shall be restored,(if damaged from relatedconstruction) to an acceptable condition, as determined by City of Wheat ridge public Works Department, and prier to the issuance of a Certificate ofOccupancy. Prior to any construction commencing, the City's representative will conduct ars € nsite inspection to determine the existing conditions of the public improvements at this address. If y you have any questions, please contact rise at 303.235.2864. David F. l rossman, P.L.S. Development Review Engineer Cite s 1s°Xi—w seatridge.co.us Geoscience & Design, Inc. P.0, Box 68 Franktown, Colorado 8ou6 - Phone: 303,688.2150 - Fax. 03.6S .1295 - CoGeoDesign SUBSURFACE INVESTIGATION JEFF.N m REPORT NO. 15-401 MY 30, 2015 NOT VALID WrMOUT ORIGINAL SIGNAMRE GEOTECHNICAL STRUCTURAL CIVIT, ENGINEERS General 1 Site Conditions 1 Field and Laboratory Investigation 1 Foundation Recommendations 2 Criteria for Concrete Slab on Grade Construction 3 Placement of Foundation Fill 5 Subsurface Drainage 5 Surface Drainage 6 Foundation Excavation 7 Radon Gas 7 General Information 7 Location Map Figure I Log of Test Holes Figure 2 Swell / Consolidation Charts Figure 3 Summary of Laboratory Testing Table I Details of Foundation Drain System Detail I Foundation Grading Detail Detail 2 Appendix Information but the Report Subsurface Inve3figatiOn Yukon Grove, LLC jW,. tenort No, 15-401 This report presents the results of data obtained during the subsurface investigation at 3361 YUKON COURT, JEFFERSON COUNTY, COLORADO, This investigation was made to determine the type of foundation required, allowable bearing capacity, and groundwater conditions encountered at the time of the field investigation. At the present time there the site is vacant. it is our understanding a single-family residence is planned for this site. The proposed structure will consist of wood framed construction with a steel reinforced concrete foundation, We anticipate the foundation loads to range from 1,000 to 2,000 pounds per lineal foot of foundation wall, The general topography of the site slopes approximately 1% to the east. —rhe vegetation at the site consists of native trees, grass and weeds, The weather was warm and partly sunny at the time of the investigation. If the type of construction changes from that specified above, please contact this office for additional recommendations and/or requirements. One (1) exploratory test hole was drilled on July 2, 2015 at the site shown on th Location Map, Figure 1. The test hole was drilled with a four -inch (4") diameter auge advW:nced with a CME -45 soil exploration drill rig. amplel drillino tools were removed from the test holes and soil sample MF I Subsurface Inves4ation Yukon Grove, LLC Colorado Geoscience and Design, Inc, Report No. 15-401 Site soil conditions encountered may appear different from the test borings as presented in this report, An excavation observation is required and must be performed by a representative of this office to verify existing soil conditions, and the proposed design bearing pressure. The excavation observation must be performed only after the entire building footprint has been excavated to the bottom of bearing elevation. In addition, it may be necessary to revise our foundation recommendations based upon results of the excavation. The fee for this observation n -Ond In the soil of the soil Failure to follow the observation requirements noted herein may jeopardize the success of this construction project and shall absolve Colorado Geoscience and Design Inc. from any and all responsibility for any damages arising from the failure to obtain proper site observations. Based on our evaluation of the subsurface conditions, we recommend the proposed single-family residence be founded on continuous concrete footings and pads. A professional engineer should use the following design criteria to design the foundations, I M RM Subsurface Investigation Yukon Grove, LLC Colorado Gpzscienm and Q&�il Inc, Renort No. 15-401 nce Risk Category Representative Percent Swell �sfSurohar e)__ Low 0 t`s lo <2 2 to <4 4 to <6 ry Hiqh 6 The swell potential of the indigenous soils for the residence at this site meet the criteria for low risk of slab -on -grade movement. Concrete stabs may be used for basement slabs, garage slabs and exterior surface (sidewalks, patios and aprons) placed on the native soil, Furthermore, intolerable movement of any slab on grade may occur at the site as a result of future factors beyond the control of Colorado Geoscience and Design, Inc. Any soil disturbed during construction shall be compacted by use of a vibratory plate in the case of loose granular soils or wheel rolled by heavy equipment in the case of soft clay or silt soils prior to placement of the concrete slab. The soil should be kept moist but not wet during the compaction process as well as immediately prior to the placement of the concrete slab directly onto the soil. Steps shall be taken to ensure that subsurface moisture beneath the concrete slab remains constant during the construction process. Is Subsurface Investigafion Yukon Grove, LLC Colorado Geoscience and Design, Inc, Report No, 15-401 Control joints shall be provided in the concrete stab. These control joints must be saw cut or tooted to a minimum of one third of the thickness of the slab, No portion of the concrete stab will have an area greater than neither 100 square feet nor a maximum dimension of 12'-0" in any direction without a control joint. All non-bearing partition walls shall be constructed with a minimum of 3 inches of float to allow for slab -on -grade movement. If a hot water heating system is used, the piping may be cast within the concrete slab if the slab is reinforced with steel rebar and special care is taken not to damage the piping during future construction activities, Nails shall not be driven into a concrete slab that has hot water piping. Base plates should be attached with construction adhesive or anchor bolts cast in the concrete slab at the time of placement. If a forced air furnace is used, a 2" flexible connection should be installed between the furnace and the duct. Jig Oil The installation of an exterior foundation perimeter drainage system is required for any habitable space below grade level. See Perimeter Drain Detail 1, for a suggested method of installing this system. The perimeter drain shall discharge at a daylight lM cation a minimum of 15 -feet away from the home. The daylight end shall have a screened end section to prevent rodents from entering the drain. Alternatively, the perimeter drain may discharge into a sump pit with a sump pump. If a sump pit is used, homeowners should perform routine observations of the sump pump system to make sure it remains in good working order, Failure to install and failure of a sump pump system can cause serious foundation problems. Water accumulation around foundation elements is the major cause of foundation stress, therefore proper installation of the perimeter drain is very important. M Subsurface Investigation Yukon Grove, LLC 9 Subsurface Investigation Yukon Grove, LLC Color2ito Go-ascrence and Des!*m, Inc. Regort No, 15-401 g Now. *-M* "*o" ffivot'1010~H.WIM-0. conversat IF owner an r con rac r, n n expene The performance of the project is not guaranteed in any manner, only that the engineering work and judgments rendered meet the standard of care of the engineering profession. The engineering services performed are within the limits set by the Client, with the usual thoroughness and competence of the engineering profession, No other representation, expressed or implied, is included or intended. Ir TV All been retained nor will they render an opinion concerning any environmental issues, hazardous waste or any other known or unknown conditions that may be present on this site, since this is not in the scope of this report. M PROJECTSubsurface 11 !i ati r�JOB NO, — 15-401 Colorado Geoscience and Design, Inc. CLIENT: Yukon Grove, LLC LOCATION -3351 YukonLog Court, Jefferson_2ou of Test Holes aty,_qpIora.do DRILLING METHOD: 4" Continuous Flight Auger Im 9M M W M W k84 M a Fine-grained sand, clayey to very clayey, medium dense, slightly moist, brown Im 0 91 M MN 72 72 Notes: Where Applicable— 'T 1, x/y indicates that 'Y' number of blows of a 140 -pound hammer falling 30a: Indicates groundwater encountered during the drilling operation. inches are required to drive a 2 -inch diameter sampler "y" number of inches. I b, Indicates ground water encountered after 24 hours. 2. Ll Indicates depth at which soil samples were taken. C. Indicates auger refusal. d, indicates caving. Em � \ LL. \ 0 § -00 \ g 00 :3 7 6 0 ± 100 :v ?: w: 2< 2 ? .<a APPLIED PRESSURE (PS TestHole No. 1 Depth 4' Soil Descriptiom » &<c»» « abb ? 100 300 im 3M SM IOM 20,000 28,000 APPLIED PRESSURE (PSF) Test Hole Na, I QeLLh,19' Soil Descri2tion: Fine-grained sand cimeLto v t cla, enL_aej, medium dense sliahtly moi t brown TWO =-1 d BRACE WALLS, 10P & BOT, I I --WELL SLOPED — 12" PER PRIOR TO BACKFILLING 10 F T, M i N. DO NOT DIKE` WITH TOP 12" OF �,1,'E_LL--CO1MPACTED BACKFILL. MODERATELY COMPACTED CONCRE7,'E GRADE BEAM BACKFILL FLOOR SLAB POLYETHYLENE GLLUED TO WALL r`,'XPAN!O0N, JOIN T__ ... ...... .. --AND EXTENDED AIe ONG THE 'AVATION, BOTTOM, OFF CHE 6C 0ULDINC3 FE -1.3 /4" 10 1 1/2" CLEAN GRAVEL t 4" DIAMETER PERFORATED PIPIE'l --,,,SLOPE DRAIN PIPE 1/8' 1 PER FOOT '10 12" NIK DAYLIGHT, OR TO A SUMP PIT, �F 'TO DAYUGHT, COVER END WITH SCREEN, BACKF1LL AROUND THE FOUNDATION SHOULD BE MOISTENED AND COMPTED AND 'THE_' FINAL GRADE SHOULD BE WELL SLOPED T 0 FIRECLUDit-.- PONDING OF RAINFALL, IRRIGAT�ON WATER, AND SNOW M11"ELT ADJACENT TO FOUNDATION WALLS. CAU7,1710M DO NO1_ DIKE OR IMPEDE THE FLOW OF WATER AWAY FRO�Ml FOUNDAT10N WALLS WITH SOD, EDGING OR DECORATIVE GRAV,E1, AND POLYETFIYLE�'�rC'_, DOWNSPOUTS AND S4_1_ COCKS SHOULD DISCHARGE !NTO SPLASI'l BLOCKS OR LONG, EXTENSIONS, DRAIN SYSTEM BE1,0W GRADE AND BACKFILL DETAILS (FOR FOOTING1`�OLJNDATION) Db: TAH.11 1 I ]F1 0 N "R A D 1 N G Q A L, LJ DECORATIVE, GRAVEL OR BARK AREA,, SOIL TO BE SLOPED AWAY FROM FOUNDATION. mm NOTE, 1, PR6VIDE A MINIMUM SLOPE OF 6" IN THE - FIRST 10'--0" FROM HOUSE (10%). 2. DOWNSPOUTS AND EXTENSIONS SHOULD EXTEND'E'D 5'--0" BEYOND THE F0UNDA"[1C)',,',!, 00 00 000%0 o=c 1,4*----F0UNDAT10N DECORATIVE, GRAVEL OR BARK AREA,, SOIL TO BE SLOPED AWAY FROM FOUNDATION. mm NOTE, 1, PR6VIDE A MINIMUM SLOPE OF 6" IN THE - FIRST 10'--0" FROM HOUSE (10%). 2. DOWNSPOUTS AND EXTENSIONS SHOULD EXTEND'E'D 5'--0" BEYOND THE F0UNDA"[1C)',,',!, Important Information About the Report The data collected by Colorado Geoscience & Design, Inc. during this investigation was used to provide geotechnical information and recommendations regarding subsurface conditions on the site investigated, the effect of those conditions oil the proposed construction, and the foundation type for the named client. The stratification lines indicated on the boring log are approximate, and subsurface conditions encountered may differ from those presented herein. This uncertainty cannot be eliminated because of the many variabilities associated with geology. For example, material and engineering characteristics of soil and bedrock may change more gradually or more quickly than indicated in this report, and the actual engineering properties of non-sarnpled soil or rock may differ from interpretations made based on boring logs. Quantitative conclusions regarding the performance of geotechnical structures prior to construction are not possible because of the complexity of subsurface conditions. Rather, engineering judgments and experience are used to estimate likely geotechnical perlunriance and provide the necessary recommendations for design and construction. Put another way, we cannot be sure about what is not visible, so the collected data and our training and experience are used to develop predictions and recommendations. There are no guarantees or warranties implied or expressed. The owner and/or client must understand that uncertainties are associated with geotechnical engineering, and they, the owner and/or client, must determine the level of risk they are willing to accept for the proposed construction. The risks can be reduced, but not eliminated, through more detailed investigation, which costs more money and takes more time, and through any appropriate construction which inigy it be recommended as a result of that more detailed investigation. To reduce the level of uncertainty, this report was prepared only for the referenced client and for the proposed construction indicated in the report. Unless authorized by Colorado Geoscience & Design, Inc, in writing, the owner will assume additional geotechnical risk if this report is used for any construction that differs from that indicated in the report. Our fin should be consulted well before changes in the proposed construction occur, such as the nature, size, configuration, orientation, or location of any improvements. Additionally, the knowledge and experience of local geotechnical practices is continually expanding and it must be understood the presented recommendations were made according to the standard of practice at the time of report issuance. If the construction occurs one or more years after issuance of the report, the owner and/or client should contact our firm, to determine if additional investigation or revised recommendations would be advisable, Geotechnical practice in the Denver Region must consider the risk associated with expansive soils and bedrock. Geotechnical practice in the Denver area uses a relative scale to evaluate swelling potentials. As stated in the Subsurface Investigation, when the sample is wetted tinder a surcharge pressure (loading) of 1000 pounds per square foot (Pp), the measured amount of swell is classified as low, moderate, high, or very high. "Fable I presents the relative classification criteria for the percentage of expansion relative to the initial sample height, at the indicated surcharge pressure, Swell Potential Chart SWELL POTENTIAL AT 1,000 LBS. CLASSIFICATION 0 to V2,% Non-expansive/Very low '2 to I Y2% Low I'/,. to 3 V2% Moderate 31/2 to 6% High 6 to 8% Very High Greater than 8% Critical The swell potential classifications are based on the percentage of swell for samples placed oil swelUconsolidation machines under a surcharge of 1000 pounds per square foot. The relative swell classification can be correlated to potential slab damage as follows: Low - minor slab cracking, minor differential movement, and heave Moderate - lab cracking and differential movement, partial framing void and furnace plenum closure. High to Very High - large slab cracking and differential moverrient, closed voids, closed furnace plenum, and possible pipe rapture. "These effects are based on monitoring and observation by several firms in the Denver metropolitan area and are not limited to the relative swell classification. More or less dainage can occur in all classifications because of the uncertainty associated with subsurface conditions and gemechnical engineering, It is unportant to note that measured swell or soil expansion is not the only geotechnical criteria for the type of floor and foundation recommendations, Additional criteria considered include: * Soil and bedrock. type and variability * Stratigraphy * Groundwater depth and anticipated post -construction moisture conditions. * Surface water drainage and features * Post -construction landscaping and irrigation * Construction details and proposed use * Local experience Post -construction landscaping and owner maintenance will greatly affect structures on expansive soils and bedrock, Typically, irrigated landscaping increases the soil moisture content above the pre -constructed water content. Slabs, pavements, and structures significantly reduce evaporation of the soil moisture. Therefore, post - construction heave and resulting damage to buildings and other improvements are likely to occur on sites with expansive soils because of the high probability that subsurface moisture content will increase as the property and surrounding area is developed. Poor owner maintenance, such as negative slopes adjacent to foundation walls and irrigated canAL bmm&*m 0 *_ - - r _( , r increase the risk of damale from expansive soil and bedrock. The property owner, and anyone he or she plans to sell the property to, must understand the risks associated with construction in an expansive soil area and also must assume responsibility for maintenance of the structure. The owner and prospective purchaser also should review "A Guide to Swelling Soilsfor Colorado Homebuyers and Homeowners, " which is a special publication (S P 43) produced by the Colorado Geological Survey to assist homeowners in reducing damage caused by swelling soils. U0 1 . , " ENUML 17 ff "T 11 I a Prepared by: Tracy Savoy s• SEG 0216-024 — Page 2 The following pages summarize the heat gain and heat loss of the building using the RCCA Manual J8 calculation procedure. The calculations are based on the information given to Savoy Engineering Group in the form of drawings, sketches, and interviews. In certain cases, Savoy Engineering Group may make assumptions about design conditions that may or may not be accurate for the location of concern. It is the responsibility of the installing HVAC contractor to verify the design conditions before equipment purchase and installation. Any load calculations provided in the following pages are based upon information provided by the party submitting a particular prefect to Savoy Engineering Group. Savoy Engineering Group has not and does not independently verify that the data provided to Savoy Engineering Group is correct or complete, and any calculations made by Savoy Engineering Group are based upon the information provided by third parties. Savoy Engineering Group makes no claim that the information given to us is correct or complete. Savoy Engineering Group utilizes WrightSoft Residential 15.0 which is an ACOA Certified and ASHRAE recommended computer program to determine the heating and cooling loads presented in this report, and is therefore very accurate. If the information given to Savoy Engineering Group is accurate, and the building is built as per the plans submitted, then the load calculations presented in this report can be assumed to be accurate. A licensed mechanical contractor may use these calculations as a starting point in system sizing and selection. Savoy Engineering Group does not provide architectural or engineering plans or diagrams for the public or for use by contractors or construction companies as final "construction documents". Savoy Engineering Group works with architectural and engineering firms and with contractors in connection with their designs of heating and air conditioning systems. If the HVAC duct layout installed on-site DOES NOT match the Manual D duct design prepared by Savoy Engineering Group, then Savoy Engineering Group cannot and will not guarantee the performance of any altered duct design. Final HVAC sizing and selection should be done by a licensed HVAC contractor, Many factors beyond the scope of this report must be considered prior to final system selection and design, such as: exact equipment availability and selections, system controls and location of controls, system air distribution and cycling, Uniform Building Code requirements, Uniform Mechanical Code requirements, and many other standard design conventions as listed by the American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE), Savoy Engineering Group therefore assumes no liability for final equipment selection or final system design. Various modifications to the information provided to Savoy Engineering Group may have occurred after this Design Support information was prepared, which would require that this Design Support information be modified in order to be accurate. After reviewing Savoy Engineering Group's report, and prior to any system purchase or installation, please inform Savoy Engineering Group in writing of any changes which may alter the assumptions and calculations contained in this report. ,♦ SEG 0216-024 — Page 3 Average climate in Wheat Ridge, Colorado er stations Report SEG 0216-024 — Pagexa 4 # SHR of 0.90 * The Load Analysis includes 5 people (# of Bedrooms + 1) and a 1,200 Btuh appliance load R6port SEG 0216-024 — Page 6 L Per Energy Star: • AC cooling equipment should be sized at 95-115% of Design Total Heat Gain, or the next nominal size that is available to satisfy the latent and sensible requirements. • Heat pump cooling equipment should be sized at 100-115% (cooling dominant climate) or 100-125% (heating dominant climate) of Design Total Heat Gain, or the next nominal size that is available to satisfy the latent and sensible requirements unless a larger size is dictated by the heating equipment selection. at Heat Loss, or next • Listed Output Heat Capacity must be sized at 100-140% of Design Tot nominal size unless a larger size is dictated by the cooling equipment selection A P%ED Assessment Entire House SA'K;N, Savoy Engineering Group Job: SEG 0216-024 Date: Feb. 23, 2016 By: Tracy Savoy Phone(801) 949-5337 Web: wwwload-calcutatioris.com Project Information For: Yukon Grove Plan A - Cottage Lot 11, 3351 Yukon Court, Wheat Ridge, CO 80033 Desi2n Conditions Locatiow Indoor: Heating cooling Denver Stapleton Int'l AP, CO, US Indoor temperature (*F) 72 75 Elevation: 5285 ft Design TD (OF) 79 20 Latitude� 40 ON Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 67.6 Dry bulb (OF) -7 95 Infiltration: Daily range Wet bulb (OF) - 59 Wind speed (mph) 15.0 T5 Test for Adequate Exposure 51veMly RMMBNEM� HOUI of Day Maximum hourly glazing load exceeds average by 24.8%. House has adjguate exposure diversily (AEDI, based on AED limit of 30%. 2016 -Feb -23 1210M N- + WrightSft O ' Right-SuiteO Universal 2015 15A25 RSU13868 Page I AM —on A Cottage Lot 11\Yukon Plan A CTG Lot 11.rup Calc - Wit House Front faces: E Component • ♦; ♦ a ... 0216-024 HouseEntire SIN Savoy EngineeringGroup Priem (801) 949-5337 Web: mmicrad-calculations,cont Prgigct Information For� Yukon Grove Plan A - Cottage Lot 11, 3351 YukonCourt, Wheat Ridge,4 Design Donafflon$ Indoor: Heating Cooling Denver Stapleton Int'lAR CO, US Indoor temperature (OF) 72 75 Elevation:Location: 5285 it Latitude: 40ON Relative humidity%50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 67.6 -45A Dry bulb95 Infiltration: Daily range (OF) - 27 (H Method Simplified Wet •• i Construction quality Tight Wind speed (mph) 15,0 7,5 Fireplaces 0 Construction descriptions AreaU-value .w Htg HTM Insul ;.ss i HTM Gain Walls 15B13-0wc-10: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, n 216 U45 13.0 3.56 768 0 0 concrete wall, r- 13 cav ins, 8" thk, 1/2" gypsum boardint fnsh n 62 0,059 294 f' e 231 #r 03,56 821 f s 216 Or s 62 f * 110 4,75 294 O04 2 w 200 O i 712 f f i 0,059 / 4,75 140 0,04 1 all 1017 f # 3,73 3798 O01 5 Yukon Plan AG Stucco Wall: Frm ii f 1 3,56 176 0,75 37 i... 'i gypsum M. iii a 142 O045 22,0 a 505 0.75 106 ox. stud an 191 0,045 681 0.75 143 Yukon Plan AG Vinly Wall-, Frm wall, vni ext, 1/2" wood shth, r-8 batt ins, n 301 U45 22,0 3,56 1069 0,75 225 r-14 spray foam ins, 1/2" gypsum i a i i wood frm, 16" e 84 0.045 f 3,56 298 0.75 63 i 0,04 f 155 1725 0,75 362 ii U45 / 3,56 322 0.75 68 all 0 0,045 f 3,56 3413 035 717 Yukon Plan Window Welt Concrete wall, 2"x4" wood int frog, 8" thk, r-1 3 n 91 0,077 110 6,08 566 0.92 84 cav ins, 1/2" gypsum board int frish e 31 0.077 13,0 &08 187 0.92 28 a 61 U77 f 6,08 374 OM 56 all 184 U77 f41117 0,92M'' Partitions • f gypsum o i int 412 f fi 0.70 288 t a Windows 4A5-2ow 2 glazing, clr low-ei. gap, n ii { ":f 0 26,9 1773 12O 794 0,340 f Mg 537 IM 241 40 0.340 f 26,9 1074 323 1291 e 25 0340 0 26.9 i. 72 32,3 807 S 43 •f 0 26.9 1142 17,8 757 f 0340 f 26,9 1343 17,8 891 20 0340 f f 26,9 a537 323 646 all Rt. f 26,9 7078 20,6 5427 2018 -Feb -23 12:10:52 i o ' Right-SuireO Universal 2015 95.0.25 RSU13868 Page 1 AM on A Cottage Lot 11\Yukon Plan A CTG Lot 11.rup Laic = MJ8 Nouse Front faces. E 4A5-2ov: 2 glazing, cir low -e outr, air gas, vni finn mat, clr innr, 1/2" gap, e 30 0,340 0 26,9 806 24.0 720 1/4" tW NFRC rated (SHGC=0.27); 5,5 ft overhang (6 ft window ht, 2 ft sep.) 4M-2ovd: 2 glazing, cir tow -e outr, air gas, insulated vinyl frm mat, cir 6 49 0,340 0 26.9 1305 I7.8 866 innr, 1/2" gap, 1/4" thk: NFRC rated (SHGC=0,27) Doors 11 DOI. Door, wit sc type e 24 0.390 0 30.8 749 10.8 263 Ceilings 165- 50ad: Attic ceiling, asphaft shingles roof mat, r-50 cell ins, 112" 1293 OMO 50,0 1.58 2043 1,03 1327 gypsum board int fresh Floors 19A-30bstp: Part floor, r-30 ins, firm f1r, 8" thkns, 1/2" gypsum board int 54 0M4 30,0 2,25 121 0.57 31 frish 21A -20t: B9 floor, heavy dry or light damp soil, Sdepth 190 0.027 0 2,13 405 0 0 21A -32t: Bg floor, heavy dry or light damp soil, 10" depth 1071 OMO 0 1.58 1692 0 0 2016Feb-23 12:10M wrightSOft" Right -SOW) Universal 2015 15,0,25 RSU13868 Page 2 AM...on ACottage Lot 111Yukon PlanA CTG Lot 11.rup Calc = We House Front faces: E Load Short Form Entire House ISAVON, t NQN0 RINci GROUP Savoy Engineering Group 'reject Information For: Yukon Grove Plan A - Cottage Lot 11, 3351 Yukon Court, Wheat Ridge, CO 80033 Job: SEG 0216-024 Date- Feb. 23, 2016 By: Tracy Savoy Phone: �801) W-5337 WW wmWoad-calculabons,com F- Design Information Htg C19 Infiltration Outside db (OF) -7 95 Method Simplified Inside db (OF) 72 75 Construction quality Tight Design TD ('F) 79 20 Fireplaces 0 Daily range - H Inside humidity 50 50 Moisture difference (gr/lb) 68 -45 Make Trane Trade XB90 Model TUCIB06OA9361A* AHRI ref 2008193 Make Trane Trade TRANE Cond 4TTR3024G1 Coil 4TXCB031BC3 AIW V1tTef---559W- 65 -- Efficiency 92.1 AFUE Efficiency 11,5 EER, 13,3 SEER Heating input 60000 Btu h Sensible cooling 20700 Btuh Heating output 56000 Btuh Latent cooling 2300 Btuh Temperature rise 63 OF Total cooling 23000 Btuh Actual air flow 986 cfm Actual air flow 900 cfm Air flow factor 0.036 cfmJBtuh Air flow factor 0.071 cfm/Btuh Static pressure 0.50 in H2O Static pressure 0,50 in H2O Space thermostat Load sensible heat ratio 1.00 ROOM NAME Area Ht g load Cig load Htg AVF Clg AVF (ft -1) (Btuh) (Btuh) (cfm) (cfm) Master Bath 149 3221 1514 115 108 M'WIC 41 0 0 0 0 Master Bedroom 186 2636 1358 94 97 Bedroom 2 110 1559 836 56 60 CL 2 14 0 0 0 0 CL 3 13 0 0 0 0 Bed 3 / Study 110 1876 1285 67 92 DR/GR/KIT 516 7427 4967 265 354 Stairs 37 0 0 0 0 PNT 9 0 0 0 0 LND 8 0 0 0 0 Bath 44 938 490 33 35 Linen 8 0 0 0 0 Crawlspace 190 1140 6 41 0 Mechanicals 416 3465 326 124 23 Bedroom 4 191 2884 1252 103 89 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed CL 4 25 0 0 0 0 Bath 2 52 414 0 15 0 Laundry 48 0 0 0 0 Stairs 2 44 0 0 0 0 EC Room 296 2081 580 74 41 G.Stir 18 0 0 0 0 Entire blouse d 2522 27643 12613 986 900 Other equip loads 6485 1642 Equip. a@ 1.00 RSM 14254 Latent cooling 0 TOTALS 2522 34128 14254 986 900 Calculations approved by ACOA to meet all requirements of Manual J 8th Ed, 2016 -Feb -23 12:10M WrightSOft Right-SuPte Universal 2015 15.0.25 RSU13868 Page 2 .on A Cottage Lot 111Yukon Plan A CTG Lott 11.rup Laic = W8 House Front faces: S I cov, , S, Right -JO Worksheet Endre House Phone: (801) 949-5337 Web: wwwload-calculations Com By: Tracy Savoy -014- WrIght"tV Right-SuiteO Universal 2015 15,0,25 RSU I — 2016-Feb-2312AA3 3868 p Cale = W8 House Front faces: E —on A Cottage Lot 11\Yukon Plan A CTG Lot 11,rup I Sautes k p 11=11,11= Right -JO 'llorksheet Entire House Phone: (801)949-5337 Web: www.load-calculations.com By: Tracy Savoy DONE 2016 -Fells -231210'M Right-StAteO UniNersal 201515,0,25 RSU13868 P .TACottage Lot ll\Yukon PWACTG Lot ll.rup Calc=W8 House Front faces: E I Right -J@ ♦ Worksheet HouseEntire Phone: (301) 949.5337 Web: load-calculatlons.com By: Tracy Savoy 2016,Feb-23 1210'M ... on ACottage Lot IIXYukon PlanA CTG Lot 11.rup Calc = MJ8 House Front faces: E Right -M Worksheet Entire House Sy: Tracy Savoy 2016 -Feb -23 12: 1 Aft,-+- WrightwofV Right-SufteO Universal 2015 15,0,25 RSU13868 Pat) _on A Cottage Lot 11\Yukon Plan A CTG Lot 11rup CalcmW8 House Front faces: E Right -J& Worksheet Entire House &Ulta vv • -- I-- — A1q7 IAI,h� —..tn-4—M—Wfinnq MM ME19230.0 US 3-mmml�r MEMO �11 Right-SuiteO Universal 2015 15.0,25 RSU13M Page 5 -on A Cottage Lot 11\Yukon Plan A CTG Lot II,ruP Calc�K!8 House Front faces: E Worksheet HouseEntire V. • •-.. is Phones- (SM 949-55337 b' eb: toad-cWculafionsxom By: Tracy Savoy gog 2016 -Feb -23 1210:62 WrightOOft' Right-SuiteO Universal 2016 15A25 RSU13868 Page 6 Calc - W8 House Front faces� E—on A Cottage Lot Right -JO Worksheet Enike House Phone: (801) 949-5337 Web: www.load-calculations,com By: Tracy Savoy 2016 -Feb -23 12:W52 A&k414- WrightSOft* Rlghl-SuiteO Universal 2015 15.0.25 RSU13868 Page 7 ,.on A Cottage Lot MYukon Plan A CTG Lot 11,rup Calc=MJ8 House Front faces � E Ad* Right -JO Worksheet Entire House Phone: (801) 949-5337 Web: wwwload-calcuiatjons,com By: Tracy Savoy RI �*��Mwrm- lam 2016 -Feb -23 12: 10 Alft -* WrIghtSOft' Right-SufteO Universal 2015 150.25 RSU13868 p ,..on ACottage Lot II\Yukon PlanA CTG Lot 11,rup Cain - W8 House Front faces: E i Right -JO Worksheet Entire House Phone: (8011949-5337 Web: wmioad-calculations,com By, Tracy Savoy MIN 2016 -Feb -23 12:10'M -01*- WrIghtgOft' Right-SuftKI) Universal 2015 15,0,25 RSU13668 P —on A Cottage Lot 11 \Yukon Plan A CTG Lot 11,rur, CaIc=W8 House Front faces: E Right -JO Worksheet Entire House Phonw (801) 949-5337 Web www.toad-calculations.com By: Tracy Savoy �Mffl MRFI ...... .... ... 2016 -Feb -23 1210:52 wrl'ght"4W Riqht�SuiteO Universal 2015 1&0,25 RSU13868 Page 10 ... on Auttage Lot MYukon PlanA CTG Lot 11,rup Cale = W8 House Front faces: E Right -JO Worksheet Entire House By: Tracy Savoy Right -JO Worksheet Entire House Job. SEG 0216-024 2016 -Feb -23 12:10:52 - Right-SuiteO Universal 201515,0,25 RSU13868 Page 12 Project Summary Entire House Savoy Engineering Group Phonet (801) 949-5337 WW wv"foad-CWCuWfiQns.00M Project Information Notes: Joy Valentine Coot Sunshine Heating & Air Conditioning, Inc Design Infonnation Weather: Denver Stapleton lnt'IAP, CO, US Winter Design Conditions Summer Design Conditions Outside db -7 "F Inside db 72 'IF Design TD 79 OF Heating Summary 011 Structure 27643 Btuh Ducts 0 Btuh Central vent (91 cfm) 6485 Btuh Humidification 0 Btuh Piping 0 Btuh Equipment load 34128 Btuh Method Simplified Construction quality Tight Fireplaces 0 Outside db Heatin Coolin Area (W) 2522 2521 Volume (ft3) 16951 16951 Air changes/hour 011 0.06 Equiv. AVF (cfm) 31 17 Outside db 95 OF Inside db 75 OF Design TD 20 OF Daily range H Relative humidity 50 % Moisture difference -45 gr/lb Sensible Cooling Equipment Load Sizing Structure 12613 Btuh Ducts 0 Btuh Central vent (91 cfm) 1642 Btuh Blower 0 Btuh Use manufacturer's data y Rate/swing multiplier 1.00 Equipment sensible load 14254 Btuh Latent Cooling Equipment Load Sizing Structure 569 Btuh Ducts 0 Btuh Central vent (91 cfm) -2304 Btuh Equipment latent load 0 Btuh Equipment total load 14254 Btuh Req, total capacity at 0.90 SHR 1.3 ton 2MM=M323MLZE= U11 1 2016-Feb- Weight$Oft' Right-Sufteli) Universal 201515.0.25 RSU13868 ... on A Cottage Lot 11\Yukon Plan A CTG Lot 11,rup Catc-W8 House Front faces E Manual S Compliance Report Job: SEG 0216-024 Date: Feb. 23, 2016 Entire House Sy: Tracy Savoy Savoy Engineering Group Phone: (801) 949-5337 Web� wowfoad-osiculations,corn N ....... - -- ------- Project Information For: Yukon Grove Plan A - Cottage Lot 11, 3351 Yukon Court, Wheat Ridge, CO 80033 L Cooling Equipment Design Conditions Equipmentlype: SplitAC Manufacturer: Manufacturer, Trane 986 ofm Actual airflow, 900 cfm Sensible capacity: 16352 Btuh Latent capacity: 1308 Btuh Total capacity: 17660 Btuh Equipment type: Gas furnace Manufacturer: Trane Actual airflow: 986 ofm Output capacity: 56000 Btuh Sensible gain: 14254 Btuh Latent gain: 0 Btuh Total gain: 14254 Btuh Estimated airflow'. 900 cfm 115% of load 0% of load 124% of load SHR, 93% 7`1111111111 111111MIN111111111101VIN IM11911101111F 1 11111111�1�11 ZMEF1133•.. 2016 -Feb -23 1211: wrights0ft' Right -Suite& Unhersat 2015 15,0.25 RSU13868 Pao ... on A Cottage Lot 11kYukon PlanA CTG Lot 11,rup Cale - MJ8 House Front fitew E i &+ wrightsoft- Right-Suita<* Universal 2015 15,0.25 RSU13868 2016 -Feb -23 1211 on ACottage Lot 11\Yukon Plan A CTG Lot 11,rup Calc = W8 House Front faces� E P -9i Return Branch Detail Table Grill Stud/Joist Size (in) Opening (in) • OX0 209 Ox 0 rt2 OX0 356 Ox 0 rtl OX0 421 -------- --- ---- --------- - Return Trunk Detail Table TrunkM 4 R. M �l����c�����, (in) Mate Peak A 0 x 0 ShtMetf Peak AVF 0 x 0 ShtMetl &+ wrightsoft- Right-Suita<* Universal 2015 15,0.25 RSU13868 2016 -Feb -23 1211 on ACottage Lot 11\Yukon Plan A CTG Lot 11,rup Calc = W8 House Front faces� E P -9i N IBM= 4xIO 74 cfm A Trans Condenser: 4TTR3024G1 Coil: 4TXC8031BC3 Furnace: TUC I B06OA936W REC Room 6" 8" 6- 14 x 14 M= Bedroom 4 IOx4 103 Om Job #: SEG 0216-024 Performed by Tracy Savoy for: Yukon Grove Man A- Cottage Lot 11, 3351 Yukon Court Wheat Ridge, CO 80033 8xx6 12 x 181 VCL4L 6.1 L'AWEd 11, AMAVLO124-M-TT-H.M.1111 . Scale: I - 81 Page I Right-SufteO Universal 2015 150.25 RSU13868 2016 -Feb -23 12:12:32 Job #: SEG 0216-024 F6iifffirnnat k.y-ftur- Yukon Grove Plan A- cottage Lot 11, 3351 Yukon Court Wheat Ridge, CO 80033 NOW -0 -0-1 =11 11 EWE "I, Mr-IMOMMOMHOMMUM or Scale', 1 : 81 Page 2 Right -Suite@ Universal 2015 15,0,25 RSU13868 2016 -Feb -23 12:12:33 1�7-1/2" 16-114" 2" DIAMETER * OUTSIDE AIR 518'" I } SingleCondensing Gas Furnac • >; s .'1►*' . 1/2' -1/2" FLUE cc NNENECT 2" A 7/8"DIA. HOLES ELECTRICAL 7-1l2" CONNECTION 1-112"' DIA. HOLE 4 ,, ' # A3 CONNECTION S 112"ELECTRICAL� 1 SUPPLY . ,�"" ,� } (ALTERNATE) 314 7/8'" DIA. K O, 28-114i � ���7. � � �"� -ELECTRICAL °° SUPPLY (ALTERNATE) (ALTERNATE) 30-51891 �Q 1-518" -1/2* DIA, r i a K.O. GAS r r r CONNECTION NNET 20r1/4"(ALTERNATE) 7tq" .. r r r r 1 + �r to&� 22-112" tCi 04 e' 1-1/8" DIAXO. c3> CONDENSATE *3ys[ DRAIN - Alternate 24-1132" } � �1ir.A�� 1-7/8"X 7/8" SLOT K.O. ��,0% 1119.CONDENSATE D t !! (FOR HOR€ZONTA) ` ' � 1. 176. U1 �4 -0 09 y 4f FURNACE AIRFLOW (CFM) VS. EXTERNAL. STATIC PRESSURE (INS. w.g.) MODEL SPEED TAP 0.10 0.20 0.30 0.40 0.50 0.50 0.70 0.80 0.90 TUC! B06OA9361A 4- HIGH - Mack 1394 1359 1314 1260 11 1122 1038 945 843 -' 1250 1232 1202 1160 1106 1040 962 873 771 2 - MIDI}. -LOW - Yellow 1102 1092 1069 1034 986 925 852 766 668 957 944 922 891 806 750 686 614 CFM VS. TEMPERATURE RISE MODELCubic Feet Per Minute (CFM) 900 1000 1100 1200 1300 1400 TUCIS06OA9 61A 56 50 45 42 39 36 10!06 0 2006 American Standard Inc. TYPE Ueow / Horizontal RATINGS U2 Input BTUH 60,000 Capacity BTUH (ICS) 56,000 AFUE 92.0 Tem2, rise jMin.-Max. ) "F. 30-60 BLOWER DRIVE DIRECT Diameter -Width (In.) 10x7 No. Used I Speeds (No.) 4 CFM vs. in. w.g. See Fan Performance Motor HP 1/3 R.P.M. 1075 Volts/Ph/Hz 115/1/60 COMBUSTION FAN -Type Centrifugal Drive - No. Speeds Direct - I Motor HP - RPM 1/55-3000 Volts/Ph/Hz 115/1/60 F.L. Amps 1.0 FILTER — Furnished? No Type Recommended High Velocity Hi Vol. (No.-Size-Thk) I - 17x25 - lin. VENT COLLAR — Size Qn.j__ 2 Round HEAT EXCHANG;___ Type -Fired Alum. Steel -Unfired PI-ey-PIA red) ORIFICES — Main Nat,Ga& Qty, — Drift Size 3-45 L.P. asM Drift Size 3-56 PILOT S I: DEVI Type Hot Surface Ignition _§UWW Mulfcort Inshot Number9 POWER CONN� V/Ph/Rz X 115/1/60 Ampacity (in Amps) 8.4 PIPIE DIMENSIONS PTTM Crated (In.) 41- 3/4 x 19-1/2 x 30-1/2 40x1Z-1L2xR§ WEIGHT Shipping (Los.) Net (Lbs) 1501140 @1 ased on U,S, Government Standard Tests. (D The above wiring specifications are in accordance with National Electrical Code; however, installations must comply with local codes. Lsa�sM �f i NATURAL GAS MODELS—Central heat- BURNERS — Multi -port, in -shot burners STYLING — Heavy gauge steel and ing furnace designs are certified by the will giveyearsof quiet and efficient service. "wraparound" cabinet construction is American Gas Association for both natu- All models can be converted to L.P. gas used in the cabinet with baked -on enamel ral and L.P. gas. Limit setting and rating without changing burners. finish for strength and beauty. The heat r -1 - der standard rating conditions using Ameri- can National Standards Institute standards. SAFE OPERATION — The Integrated System Control has solid state devices, which continuously monitor for presence of flame, when the system is in the heating mode of operation. Slow opening, dual solenoid combination gas valve and regu- lator provide extra safety and quieter op- eration, SnoeTrane has a pol4otoontnuous product andpoiduid data drnprovernent, it reservesthe right tocharigespecifica- tnins and design without notice, Trane A business of American Standard Companies www.trane,com Js for E,A,C./humidifier, ,trivig '**ver At*t*r, witX vuXiciox"t 2ixl*�a range for most heating and cooling re- quirements, will switch from heating to cooling speeds on demand from room thermostat. The blower door safety switch when the blower door is removed, (Fan dard). pletely lined with foil -faced fiberglass insu- lation. This results in quiet and efficient operation due to the excellent acoustical and insulating qualities of fiberglass. The integrated system control lights the the room thermostat. Complete front ser- vice access. I . �, • •"MLO I "I IS https://www.cotilf'ortsite.com/EBizJApplication`/productlnf'o/Performanc..� Capacities are net in Stuh/1000 - indoor fan heat deducted Outdoor Model 4TTR3024GI Indoor Model 4TXCB031BC3 ARIREF 5593965 Airflow, 800 Total Net Capacity 23000 Btuh Airflow 800 CFM Compressor Power 1580 watts Indoor Fan Power 292 watts Outdoor Fan Power 128 watts SEER 1125 EM Rated with 25 Feet 5/8 suction 3/8 liquid lines O.D.D.B. I.DOTAL CAPACITY SENSIBLE CAPACITY SYSTEM 72 Kw 85 =3 59 22�50 Airflow 700 900 Total Capacity 0.98 02 Sensible Capacity 0,93 107 Compressor Kw 099 101 Rated with 25 Feet 5/8 suction 3/8 liquid lines O.D.D.B. I.DOTAL CAPACITY SENSIBLE CAPACITY SYSTEM 72 Kw 85 =3 59 22�50 17�50 [19.610 21.70 L21 1.87 85 6 2 3j 23.50 .50 14.30 '6. 0 "��o 00 1.88 85 67 25.20 11,40 1150 15.60 17.00 1,90 95 59 20,50 16,60 E 20,50 20.5 1.96 95 63 21,50 21�50 1150 1730 [19J0 1.98 95 67 23,00 10,50 12,60 1430 16,10 2.00 105 63 19.50 1230 14.80 16,90 18.30 2.08 105 67 20.80 930 11.80 1190 1530 2,10 105 71 22,60 6.90 9.00 11,10 12.40 2.12 115 63 17.50 11,90 14,00 16.10 17.50 2,18 115 67 18.70 9.00 11.10 1120 14.50 2.20 115 71 2030 6.10 8.20 10.30 11.70 122 *** 95 59 20,50 IDDB= 75.00 18.70 1.96 * * Performance at selected design conditions Dry coil condition (Total Capacity = Sensible Capacity) Total capacity, compressor Kw, and app» dew point valid only for wetcoil All temperatures in Degree F I of 1 4/23/2015 8:33 ANM City of i jige CO MMUNITY DEVELOPMENT City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033 -8001 P: 303.235.2846 F: 303.235.2857 March 25, 2015 OFFICIAL ADDRESS NOTIFICATION NOTIFICATION is hereby given that the following address has been assigned to the property /properties as indicated below: PROPERTY OWNER(S): Bill Fritz NEW ADDRESS: Wheat Ridge, CO 80033 Lot 1— 3205 Yukon Ct. Lot 2 — 3225 Yukon Ct. Lot 3 — 3245 Yukon Ct. Lot 4 — 3265 Yukon Ct. Lot 5 — 3285 Yukon Ct. Lot 6 — 3295 Yukon Ct. Lot 7 — 3311 Yukon Ct. Lot 8 — 3321 Yukon Ct. Lot 9 — 3331 Yukon Ct. Lot 10 — 3341 Yukon Ct. Lot 11 — 3351 Yukon Ct. Lot 12 — 3361 Yukon Ct. Lot 13 — 3371 Yukon Ct. Lot 14 — 3391 Yukon Ct. Lot 15 — 3360 Yukon Ct. Lot 16 — 3350 Yukon Ct. Lot 17 — 3340 Yukon Ct. Lot 18 — 3330 Yukon Ct. Lot 19 — 3320 Yukon Ct. Lot 20 — 3300 Yukon Ct. SUBDIVISION: Yukon Grove Subdivision, Filing No. 1 Jefferson County Reception Number for Plat: 2015016465 (See attachment) NOTES This is a courtesy notification. AUTHORIZED BY: I DATE: DISTRIBUTION: 1. Property Owner 2. Jefferson County Assessor, ATTN: Data Control, 100 Jefferson County Parkway, Golden, 80419 3. Jefferson County Mapping, ATTN: Addressing, 100 Jefferson County Parkway, Golden, 80419 4. Jefferson County Elections, ATTN: H. Roth, 3500 Illinois Ave., Laramie Building, Suite 1100, Golden, CO 80401 5. Email to Jeffco IT Services at smitchel@jeffco.us 6. U.S. Post Office, 4210 Wadsworth Blvd., Wheat Ridge, CO 80033 7. Email to erlinda i.martinezna,usps.g and krissy.j.summerfield(a)usps. ov 8. Xcel Energy, ATTN: Correspondence, 1123 W. 3rd Ave., Denver, CO 80223 www.ci.wheatridge.co.us 9. Century Link, Capacity Provisioning Specialist, 5325 Zuni St., Room 728, Denver, CO 80221 10. Comcast, Attn: Scott Moore, 6850 S. Tucson Way, Englewood, CO 80112 11. Consolidated Mutual Water District 12. Wheat Ridge Sanitation District 13. Wheat Ridge Fire District 14. Wheat Ridge Planning Division 15. Wheat Ridge Building Division 16. Wheat Ridge Police Department 17. GIS Specialist 18. Log File NOTE: Please notify all other parties concerned. ADDRESS MAP UPDATED BY: Vicinity Map DATE: A rd I M YUKON GROVE SUBDIVISION, FILING NO. 1 A PARCEL OF LAND LOCATED IN THE NW 1/4 OF SECTION 26, T.3S., R.69W., OF THE 6TH PM CITY OFWHEAT RIDGE, COUNTY OFJEFFERSON, STATE OF COLORADO I SHEET 02 OF 03 N00*06'22"W 359 AREA RESERVED FOR FUn R*HT-OF-A (SEE TRACT D NOTE ON SHEET AND SOOIV51: 299. EASEMENT, TYP )9oOL 0 R W1 10' x W STORMWATER EASEMENT HEREBY DEDICATED BY THIS PLAT R-2 ZONWO UWPLA 7TED a Ur4jrY AND vom" EASEMENT, lypl R4 #5 RIEW Wl CAP 4S 115721 wil STREET RIGHT-OF-WAY MONUME SHALL MoNU' &Sf; N M 70 FINAL UFT OF ASPHALT PAVEMX VLL BE PROVIDED BY THE CITY OF WHEAT ROM UPON REQUEST -Pt No 157♦9 BEKilmaK WORTH j CORNER, SECTION 2 FRO Z9 BRASS CAP ELEVATIONS ARE BASED ON THE COY OF WHWI RIDGE ON JPHAC PLS# 13212 IN RANGE BOX I A CRY ♦ WHEAT RID" 11/16 STAftESS STEEL ROD 1 2 FOOT LONG WITH SLEEVE AND DATUM ACCESS COVER, STATE PLANE COORD A1 LATN3T46`09,72O504* u ELEVATION - 54 FEET (NAVD OAT M F- LON'WIOS'04'53.207629* CITY OF WHEAT RIDGE DATUM U&S QE OFMINQ5. *70582148 E. 184+125 BEARINGS ARE BASED ON THE SOUTHERLY LINE OF THE NORTHWEST QUARTER OF SECTION 26, TOWNSHIP 3 SOUTH, RANGE 69 WEST OF THE SIXTH PR94CPAL MERIDIAN BEAR N 89*45 ' 02 'E BETWEEN THE WEST QUARTER CORNER BEING A FOUND 3 %* ALUMINUM CAP PLS # 13212 IN RANGE BOX AND THE CENTER QUARTER CORNER SONG A FOUND 3 34 ALUMJNUU CAP PLS # 132t2 IN RANGE BOX, rl N CHAIN LINK FENCE --------- BARB #ARE FENCE PROPOSED PROPERTY LINE RIGHT—OF—WAY LINE SECTION UNE ME N mm JANUARY 22, 2015 NOVEMBER 3, 2014