HomeMy WebLinkAbout4651 Independence Street=11
,.
INSPECTION REQUEST
Inspections will not be performed unless this card is posted on the project site.
Call the inspection request line before 11:59 p.m. to receive an inspection the following business day,
Inspector Must Sign ALL Spaces pertinent to this project
Foundation In« :.:
(BelowWater Service �Underqround)
Heating ,.
i• • s r*wim
w s :. -s
Final Plumbing
Final Mechanical
Final Buildino I Frame
}
ROW
F
Sth ,... .. ..
..... ... . .
401 Inde Aoi)ce ST
PL f'ERKT 40: 2015-01041
.},�?3dS[ii1 k�. �a1 i�`F«5f
§T�4SYTti
3710 .,
1N.4g
AUTH CM&3581—
5
.,
* * * ' "' ! as * • * s e: x*
OccupancyFire Inspection Fire Protection Dist,
lig
41
Permitted *Certificate ofOccupancy
Protect
Inspections will not be performed unless this card is posted on the project site.
i Call the inspection request line before 11:59 p.m. to receive an inspection the following business day.
Inspector Must Sign ALL Spaces pertinent to this project
Insi;;Zt—or
Foundation Inspections
initials Comments
Monolithic Stab Reinforcement
Caissons
Footing/Stemwall P.E. Letter
Underground/Slab Inspections
Comments
V p1 it 10
..Service(Underground)
Water Service
ul o (Underground)
'• e: is o
r.Inspector
Initials
heathing__
Lath / Wall Tie
Rough Electric
Rough Plumbing
Rough
Rough Framins
Drywall
Final In pections Inspector Comments
Initial
00111 M. I I
Final Plumbing
Final Mechanical
oil W NO 4
ROW & Drainage Public Works Dept.
inspections call 303-235-2861. For fire inspections
Fire Inspection .Protection contactProtection # your • #
is '' • e. * e ar..e a - a -.. a '..e e- e.:e e " r •.:... .: s. •:. a e«: a
Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued
Protect • From The Weather
To: Page 2 of 2 2018-07-18 20:18:24 (GMT) 13034240495 From: Jassy Lanyon
City of
ea
Date.
P Sjd
�CCOOMMAMUNITY DEVELOPMENT
udg
M`'. N,t'Rid,CO 30033
f : 303 235-2856 *. 'ax. 303-23 -8929
Application,
MNliv
i' # µ,..,.#.
Y
i a
f a
eIMP*...:
OM
INSPECTION RECORD Occuaancygype
'V INSPECTION LINE: (303) 234 -5933
Inspections will not be made unless this card is posted on the building site
Call by 3:00 PM to receive inspection the following business day.
InF� 1 Il(d PlnOt��loMn.n ' cr P II I)f"I'.
IN PECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB �� l
FOUNDATION INSPECTIONS
DATE
INSPECTOR
INITIALS
COMMENTS:
Footings /Caissons
Stemwall / (CEG) Concrete
Encased Ground
Reinforcing or Monolithic
Weatherproof / French Drain
Sewer Service Lines
-
Water Service Lines
INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS
SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS.
CONCRETE SLAB FLOOR
Electrical
Heating (Underground)
ROUGHS
Sheathing
Lath /Wall tie
Mid -Roof
Electrical Service
Rough Electric
Rough Plumbing
-
Gas Piping
INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS
SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS.
Rough Mechanical
"NOTE. ALL ITEMS MUST BE COMPLETED AND APPROVED BY PLANNING AND ZONING, BUILDING AND PUBLIC WORKS BEFORE A
CERTIFICATE OF OCCUPANCY IS ISSUED. FINAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTEAUTHORIZATION
OF CERTIFICATE OF OCCUPANCY NOR PERMISSION FOR OCCUPANCY.
fRVVCCVIRV
Framing
Insulation
Drywall Screw
FINALS
Electrical
Plumbing
Mechanical
Roof
Building Final
Fire Department
R.O.W & Drainage
INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS
SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS.
Parking & Landscaping
"NOTE. ALL ITEMS MUST BE COMPLETED AND APPROVED BY PLANNING AND ZONING, BUILDING AND PUBLIC WORKS BEFORE A
CERTIFICATE OF OCCUPANCY IS ISSUED. FINAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTEAUTHORIZATION
OF CERTIFICATE OF OCCUPANCY NOR PERMISSION FOR OCCUPANCY.
OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF OCCUPANCY IS ISSUED
PROTECT THIS CARD FROM THE WEATHER
1�
CITY OF WHEAT RIDGE
1 Building Inspection Division
(303) 234 -5933 Inspection line
(303) 235 -2855 Office ' (303) 2 F 9 &�
INSPECTION NOTICE
4 /
inspection Type
Job Address
Permit Number
A
❑ No one available for inspection: , ime AM /PM
Re- Inspection required: Yes /N'
When co rectio shave been maall�t9r re- specfion at 303 - 234 -5933
a 4 f _�y7
Date: i A Inspector: �,,
1 �
DO NOT REMOVE THIS NOTICE
r
IN TI4REQUES A N: 0 903)•2IA e -At 3RidgV DING.OFFICE: (303)235 -2855
BE Residential Electric PERMITN- T110063 BUSINESS DAY.
7 �
PERMIT NO: 110063 ISSUED: 01/24/2011
JOB ADDRESS: 4651 INDEPENDENCE ST EXPIRES: 01/24/2012
DESCRIPTION: 150 amp overhead service all in one electrical panel
* ** CONTACTS * **
owner 303/525 -8668 Pete Walstrom
sub 303/422 -9219 J. David Doherty 01 -8046 Piper Electric Co.
** PARCEL INFO
**
ZONE CODE:
UA
USE:
UA
SUBDIVISION:
UA
BLOCK /LOT #:
0/
** FEE SUMMARY ** ESTIMATED PROJECT VALUATION: 1,910.00
FEES
Permit Fee 77.50
Total Valuation .00
Use Tax 34.38
** TOTAL ** 111.88
Conditions:
Must comply w/ 2006 IRC & 2005 NEC.
Subject to field inspections.
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and
specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the
legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform
the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all
entities named with'n this document as parties to the work to be performed and that all work to be performed is disclosed in
his do umen and/ its' accompanying approved plans and specifications.
-a -l�
Signature of OWNER or ONTRACTOR (Circle one) Date
1. This permit was issued based on the information provided in the permit application and accompanying plans and
specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances,
regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must
be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted
at the discretion of the Chief Building Official and may be subject to a fee equal to one- half of the original permit £ee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to
the standard requirements, fees and procedures for approval of any new permit. Re- issuance or extension of expired
permits is at the sole discretion of the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior
and specific approval.
S. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy
of all required inspections and shall not proceed or conceal work without written approval of such work from the
Building and Inspection Services Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of
any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject
to field inspection.
Sign atu ief Building Offical Date
INS CTION REQUEST LINE: (303)234 -5933 BUILDING OFFICE: (303)235 -2855
REQ ESTS MUST BE MADE BY 3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
DEPARTMENT OF PLANNING AND DEVELOPMENT
OE W11[g BUILDING INSPECTION LINE - 303 - 234 -5933
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
C �( OR ADO WHEAT RIDGE, CO 80215 - (3 y 03 3- - 2 23 3 y 5- 22885 si 7��
ll- I"�"i�i CA d d ®4 T
Building Permit Number:
Date: 1-2f-1)
Property Owner: ()JaIS4rOM
Property Address: q-(p,5 ( T'ride-pe-rlelenC4 5a-. Phone {303) S'(v(0
Contractor License No.: I $0 Ie
Company: at0ee FUJ ie, (o.Tivc Phone:bca) 422. QZ14 21x4-.
1(07
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate,
and do not violate applicable ordinances, rules or regulations of the City of Wheat,Ridgeor
covenants, easements orrestrictions ofrecord; that all measurements shown, and allegations
made are accurate; that I have read. and agree . to abide by all conditions printed on this
application and that I assume full responsibility for compliance with the Wheat Ridge
Building Code (U.B.C) and all other applicable Wheat Ridge ordinances, for work under
this permit. _ I
Construction Value:$ 1 1 1 10 o0
Permit Fee:$
Plan Review Fee:$
Use Tax:$
Total:$
Description: 1`uy - A' , are) ins-) -all one-�U ntw I`�'oAI Ott"heec( aLL- lti -0/'A
1 6
,e--leC.+Ir.Lcal Pc' .
BUILDING DEPARTMENT USE ONLY
SIC: Sq.Ft.:
ZONING COMMENTS:
Approval:
Zoning:
BUILDING COMMENTS:
Approval:
PUBLIC WORKS COMMENTS:
Approval:
Occupancy: Walls: Roof: Stories: Residential, Units:
Electrical License No: 30 Plumbing License No: Mechanical License No:
Company: P Eltc- -l-ciG Co.1"WCCompany: Company:
Expiration Date: 2-1 7.912 - 0 It Expiration Date: Expiration Date:
Approval: Approval: Approval:
(1) This permit was issued in accordance with the provisions set forth in your application and is subject to the laws of the State of Colorado and to the Zoning
Regulations and Building Coda of Wheat Ridge, Colorado or any other applicable ordinances of the City.
(2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building authorized is suspended or
abandoned for a period of 120 days.
(3) If this permit expires, a new permit may be acquired for a fee of one -half the amount normally required, provided no changes have been or will be made in
the original plans and specifications and any suspension or abandonment has not exceeded one year Ifchanees have peen cr if suspension nr ahnndnnineni
exceeds one (1) year, full fees shall be paid for a new permit.
(4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
(5) Contractorshall notify the Building Inspector twenty- four(24) hours in advance for all inspections and shall receive written approval on inspection card be fore
proceeding with successive phases of the job.
(6) The issuance of a permit or the approval of drawings and specifications shall not be construed to be a permit for, nor an approval of, any violation of the
provisions of the building codes or any other ordinance, law, rule or regulation.
Chief Building Inspector