Loading...
HomeMy WebLinkAbout3920 Newland StreetFrom: no-reolvCalci.wheatridae.co.us To: CommDev Permits Subject: Online Form Submittal: PERMIT APPLICATION Sewer or Water Line Repair Date: Thursday, May 26, 2022 11:39:19 AM CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Report any suspicious activities to the IT Division. PERMIT APPLICATION Sewer or Water Line Repair This application is exclusively for SEWER OR WATER LINE REPAIR -IN YARD Your Permit will be emailed to the email address provided below once it is processed. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN WORK UNTIL PERMIT HAS BEEN ISSUED. Right of Way permits must be applied for with the Public Works Department. Is this application for Yes sewer line or water line repair - in yard only? PROPERTY INFORMATION Is this Residential or Residential Commercial? Property Address 3920 Newland Street Wheatridge Co 80003 Property Owner Name Ryan vinoche Property Owner Phone Number (enter WITH dashes, eg 303-123- 4567) Property Owner Email Address Attach City of Wheat Ridge Electronic Payment Form - "DO NOT ATTACH A PICTURE OF A CREDIT CARD" 720-278-4177 rvinoche@gmail.com Can -Scanner 05-26-2022 11.27. Ddf CONTRACTOR INFORMATION Contractor Business Safe Investment Sewer & Drain Name Contractor's License 210366 Number (This is a 5 or 6 digit number for the City of Wheat Ridge) Contractor Phone 7203644891 Number (enter WITH dashes, eg 303-123- 4567) Contractor Email sisddenver@gmail.com Address Retype Contractor sisddenver@gmail.com Email Address 01:K163CiIi1 ffl0N]avOLelS:/ Is this a sewer line or sewer Line water line repair? Length of repair 5 feet with double sweeps Location of repair Front (backyard, frontyard, etc) Provide additional Double sweep clean outs details including installation of clean - outs. Project Value (contract 1500 value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have Yes been authorized by the legal owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Person Applying for Nathan Fairchild Pe rm it Email not displaying correctly? View it in your browser. 1* ► � i City of Wheat Ridge '/� Residential Plumbing PERMIT - 202002304 PERMIT NO: 202002304 ISSUED: 11/06/2020 JOB ADDRESS: 3920 Newland St EXPIRES: 11/06/2021 JOB DESCRIPTION: Replace one 40,000 btu 40 gallon water heater with a 199,000 btu tankless water heater *** CONTACTS *** OWNER (720)278-4177 V I NO CHE RYAN SUB (303)980-3788 BRYAN QUINN 150275 QUINNAIR HEATING & AIR GOND. *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 31650.00 FEES Total Valuation 0.00 Use Tax 76.65 Permit Fee 109.20 ** TOTAL ** 185.85 *** COMMENTS *** *** CONDITIONS *** All work shall comply 2018 International Codes, 2020 NEC (if applicable), and ordinances adopted by the City of Wheat Ridge. Work is subject to field inspections. I, by my signature, do hereby attest that the work to, be performed shall comply with all accompanying approved plans and specifications, applicae building codes, and all applicable municpal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this�permrt. I further attest that I am leg ally authorized to include alI entities named within this document as parties to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date 1, This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180, days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and��procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all requ�ired inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, anviolation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. From: no-reolv(alci.wheatridae.m. us To: CommDev Pets Subject: Online Form Submittal: General Permit Application Date: Friday, November 6, 2020 12:16:29 PM General Permit Application This application is exclusively for Scopes of Work that do not already have a specific form. YOU MUST ATTACH AN ELECTRONIC PAYMENT FORM IN ORDER FOR THE PERMIT TO BE PROCESSED. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN WORK UNTIL PERMIT HAS BEEN ISSUED. PROPERTY INFORMATION Is the property Residential Residential or Commercial? Property Address 3920 Newland St Wheat Ridge, CO 80033 Property Owner Name Ryan vinoche Property Owner Phone (720) 278-4177 Number (enter WITH dashes, eg 303-123- 4567) Property Owner Email Rvinoche@gmail.com Address Attach City of Wheat Ridge Electronic Payment Form - "DO NOT ATTACH A PICTURE OF A CREDIT CARD" CONTACT INFORMATION Submitting General Quinnair Heating & Air Conditioning Contractor or Architect Contractor's License Number (This is a 5 or 6 digit number for the City of Wheat Ridge) 150275 Contract Phone 303-980-3788 Number (enter WITH dashes, eg 303-123- 4567) Contact Email Address quinnair@live.com Retype Contact Email quinnair@live.com Address 01:K161CiI91 ffl0N]&TO(6]N:/ Detailed Scope of Replace one 40,000 btu 40 gallon water heater with a 199,000 Work - Provide a btu tankless water heater detailed description of work including mechanical, electrical, plumbing work occurring, adding/removing walls, etc. Square footage of 2570 scope of work Location of work Mechanical room in basement (backyard, on roof, etc) Project Value (contract 3650.00 value or cost of ALL materials and labor) Upload Engineer letter, Field not completed. other documents on 8 1/2" x 11 " Upload Asbestos Field not completed. Report if triggler level is met per CDPHE regulation. Upload Drawings 11,, x Field not completed. 17" or larger SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have Yes been authorized by the legal owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Person Applying for Bryan Quinn Permit Email not displaying correctly? View it in your browser. i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 75 r Job Address: .3 q1.1116 I I S Permit Number:% ❑ No one available for inspection:'F4me AM/PM Re -Inspection required: Yes (,No When correcti ns ave been made, call for re -inspection at 303-234-5933 Date: i Inspector: /' DO NOT REMOVE THIS NOTICE City of Wheat Ridge Residential Solar PERMIT - 201802830 PERMIT NO: 201802830 ISSUED: 11/07/2018 JOB ADDRESS: 3920 Newland St EXPIRES: 11/07/2019 JOB DESCRIPTION: Residential solar roof mounted grid tied solar PV 3.3 KW. *** CONTACTS *** OWNER (720)495-5447 VINOCHE, RYAN SUB (385)482-0045 James E. maule 170691 Blue Raven Solar Holdings *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 7,776.78 FEES Total Valuation 0.00 Residential Solar 500.00 ** TOTAL ** 500.00 *** COMMENTS *** *** CONDITIONS *** Approved per plans and red -line notes on plans. Must comply with 2012 IRC, 2017 NEC and all applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections. 1, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that 1 am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed andktltat/la work to be pert-onmed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Budding Official and may be subject to a fee equal to one-half of the originalermit fee. 3. if this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Budding Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5, The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of al] required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any applicabl ode or any oriiyance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Ifuilding Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. { RECEWED City of ;z W heat j�id +e COMMUNITY DEVELOPMENT Building & Inspection Services Division 7500 W. 29th Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permits(o)ci.wheatridge.co.us I FOR OFFICE USE ONLY I Date: /6/11 ///1:5 Plan/Permit # P} evie Rw Fee/ 962 9' 3 10 Building Permit Application *** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: 3920 Newland Street, Wheat Ridge, Colorado, 80033, US Property Owner (please print): Ryan Vinoche Phone: Property Owner Email: rvinoche@gmail.com Mailing Address: (if different than property address) Address: City, State, Zip: Architect/Engineer: Architect/Engineer E-mail: Contractor: Blue Raven Solar LLC Contractors City License #: 170691 Phone: Phone: 385-482-0045 Contractor E-mail Address: permitting.department@blueravensolar.com Sub Contractors: Electrical: W.R. City License # Other City Licensed Sub: City License # Plumbing: W.R. City License # Other City Licensed Sub: City License # Mechanical: W.R. City License # Complete all information on BOTH sides of this form ❑ COMMERCIAL ❑ RESIDENTIAL Description of work: (Check all that apply) ❑ NEW COMMERCIAL STRUCTURE ❑ ELECTRICAL SERVICE UPGRADE ❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING ❑ COMMERCIAL ADDITION ❑ RESIDENTIAL ROOFING ❑ RESDENTIAL ADDITION ❑ WINDOW REPLACEMENT ❑ COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT ❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT ❑ ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT ® OTHER (Describe) Rooftop Solar Photovoltaic System (For ALL projects, please provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc.) , t��, j L �.3 V ` 'V —'C v of M0 U V)k e—A — i U� l t C& Sq. FULF Amps Btu's Squares Gallons Other Project Value: (Contract value or the cost of all materials and labor included in the entire project) $7,776.78 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, casements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLEONE (OWNER) (CONTRACTOR) or (AUTHORIZED REPRESENTATIVE) Electronic Signature (first and last name): _ *4 ZONING COMMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer DEPARTMENT USE ONLY of (OWNER) (CONTRACTOR) DATE. 10/08/2018 OCCUPANCY CLASSIFICATION: Building Division Valuation: $ E n s i n E R VSE Project Number: U2001-1542-181 October 17, 2018 Blue Raven Solar, LLC ATTENTION: Scott Gurney 1220 S. 630 E., Suite 430 American Fork, UT 84003 IVSD Pei_ REFERENCE: Ryan Vinoche Residence: 3920 Newland Street, Wheat Ridge, CO 80033 Solar Array Installation To Whom It May Concern: city Of Wheat Rid,U, ',qn9 DN,S`ofi Per your request, we have reviewed the existing structure at the above referenced site. The purpose of our review was to determine the adequacy of the existing structure to support the proposed installation of solar panels on the roof as shown on the panel layout plan. Based upon our review, we conclude that the existing structure will require retrofit in order to support the proposed solar panel installation. The existing rafters must be retrofit by installing a 2x rafter of equal size in the center 2/3 of the length of the existing rafter. Install the new 2x rafter with 16d sinkers at 6" O.C. staggered. The design of the solar panel racking (mounts, rails, etc.), and electrical engineering is the responsibility of others. Design Parameters Code: International Building Code, 2015 Edition Risk Category: II Design wind speed: 136 mph (3 -sec gust) per ASCE 7-10 Wind exposure category: C Ground snow load: 30 psf (non reducible) Existing Roof Structure Roof structure: 2x8 rafters @ 16" O.C. (retrofit per above) Roofing material: asphalt shingles Connection to Roof Mounting connection: (4) 1/4 " lag screws w/ min. 0.46875" embedment into framing at max. 48" O.C. along rails 2 rails per row of panels, maximum panel height = T-6" Conclusions Based upon our review, we conclude that the existing structure will require retrofit in order to support the proposed solar panel installation. See attached calculations for an analysis of the existing rafters. #201J?62-9^50 651 W. Galena Park Blvd., Ste. 101 / Draper, UT 84020 / T (801) 090-1775 / F (801) 990-1776 / www.vectorse.corn VSE Project Number: U2001-1542-181 T Ryan Vinoche Residence 9/25/2018 n G i n R S The solar array will be flush -mounted (no more than 6" above the roof surface) and parallel to the roof surface. Thus, we conclude that any additional wind loading on the structure related to the addition of the proposed solar array is negligible. Regarding seismic loads, we conclude that any additional forces will be small. With an assumed roof dead load of 10 psf, solar array dead load of 3 psf, and affected roof area of 33% (maximum), the additional dead load (and consequential seismic load) will be 9.9%. This calculation conservatively neglects wall weight. Because the increase in lateral forces is less than 10%, this addition meets the requirements of the exception in Section807.5 of the 2015 IEBC. Thus the existing structure is permitted to remain unaltered. Limitations Installation of the solar panels must be performed in accordance with manufacturer recommendations. All work performed must be in accordance with accepted industry -wide methods and applicable safety standards. The contractor shall notify Vector Structural Engineering, LLC should any damage, deterioration or discrepancies between the as -built condition of the structure and the condition described in this letter be found. Connections to existing roof framing must be staggered, except at array ends, so as not to overload any existing structural member. The use of solar panel support span tables provided by others is allowed only where the building type, site conditions, site-specific design parameters, and solar panel configuration match the description of the span tables. The design of the solar panel racking (mounts, rails, etc.), and electrical engineering is the responsibility of others. Waterproofing around the roof penetrations is the responsibility of others. Vector Structural Engineering assumes no responsibility for improper installation of the solar array. VECTOR STRUCTURAL ENGINEERING, LLC Clifton Palmer, P.E. CO License: 0051669 - Expires: 10/31/2019 Project Engineer Enclosures CMP/cjw City 0J, Wheat Ridge "79 D140 651 W. Galena Park Blvd., Ste. 101 / Draper; UT 84020 / T (801) 990-1775 / F (801) 990-1776 / www,vectorse,com JOB NO.: U2001-1542-181 TSUBJECT: WIND PRESSURE PROJECT: Ryan Vinoche Residence Com onents and Cladding Wind Calculations Label: 1Solar Panel Array SITE-SPECIFIC WIND PARAMETERS: Basic Wind Speed [mph]: 136 Notes: Exposure Category: C Risk Category: II ADDITIONAL INPUT & CALCULATIONS: Height of Roof, h [ft]: 15 (Approximate) Comp/Cladding Location: Gable/Hip Roofs 7* < 0:5 27° Enclosure Classification: Enclosed Buildings Zone 1 GCp: 0.9 Figure 30.4-2B Zone 2 GCp: 1.7 Zone 3 GCp: 2.6 a: 9.5 Table 26.9-1 z9 [ft]: 900 Table 26.9-1 Kh: 0.85 Table 30.3-1 KZt: 1 Equation 26.8-' Kd: 0.85 Table 26.6-1 Velocity Pressure, qh [psf]: 34.2 Equation 30.3-' GCp;: 0 Table 26.11-1 Note: Calculations per ASCE 7-10 Hip? No (enter largest abs. value) (enter largest abs. value) (enter largest abs. value) (largest abs. value) OUTPUT: I p = qh UjC, —GCp; Equation 30.9-1 Zone 1 Pressure, p [psf]: 30.7 psf (1.0 W, Interior Zones*) Zone 2 Pressure, p [psf]: 58.1 psf (1.0 W, End Zones*) Zone 3 Pressure, p [psf]: 88.8 psf (1.0 W, Corner Zones* within a) (a= 3 ft) Cityof Wheat Rict ge "'�9 Di ils\O` JOB NO.: U2001-1542-181 TR SUBJECT: CONNECTION E n j n E E R S PROJECT: Ryan Vinoche Residence Lag Screw Connection Capacity: Demand: Lag Screw Size [in]: 1/4 Pressure Max Max. Trib. Cd: 1.6 NDS Table 2.3.2 2 Max. Uplift Embedment' [in]: 0.469 Tributary Grade: DF (G = 0.5) Capacity [lbs/in]: 225 NDS Table 12.2A Number of Screws: 4 Zone Prying Coefficient:1 1.4 Total Capacity [lbs]: 1 482 18.4 Demand< Capacity: CONNECTION OKAY 1. Embedment is measured from the top of the framing member to the beginning of the tapered tip of the lag screw. Embedment in sheathing or other material is not effective. The length of the tapered tip is not part of the embedment length. 2. 'Max. Trib Area' is the product of the 'Max. Tributary Width' (along the rails) and 1/2 the panel width/height (perpendicular to the rails). city o� Wheat Ridge �/a�8 Divis�ot� (0.6 Wind) Tributary Area (Ibs) (psf) Width (ft) (ft)Force Zone 1 18.4 4.0 12.0 221 2 34.8 4.0 12.0 418 3 53.3 3.0 9.0 480 Demand< Capacity: CONNECTION OKAY 1. Embedment is measured from the top of the framing member to the beginning of the tapered tip of the lag screw. Embedment in sheathing or other material is not effective. The length of the tapered tip is not part of the embedment length. 2. 'Max. Trib Area' is the product of the 'Max. Tributary Width' (along the rails) and 1/2 the panel width/height (perpendicular to the rails). city o� Wheat Ridge �/a�8 Divis�ot� JOB NO.: U2001-1542-181 SUBJECT: GRAVITY LOADS n G 1 r-1 E E R S PROJECT: Ryan Vinoche Residence CALCULATE ESTIMATED GRAVITY LOADS ROOF DEAD LOAD I Roof Pitch/12 Asphalt Shingles 1/2" Plywood Framing Insulation 1/2" Gypsum Clg. M, E & Misc ROOF LIVE LOAD (Lr) Increase due to Original pitch loading 2.0 1.7 1.0 8 3.0 psf 0.0 psf 0.0 psf 0.0 psf DL 6 psf PV Array DL 3 psf 1.01 2.0 psf 1.01 1.0 psf Existing Design Roof Live Load [psf] 20 ASCE 7-10, Table 4-1 Roof Live Load With PV Array [psf] 0 w/ Solar Panel SNOW LOAD (S): Existing Array Roof Slope [x:12]: Roof Slope [°]: Snow Ground Load, pg [psf]: Terrain Category: Exposure of Roof: Exposure Factor, Ce: Thermal Factor, Ct: Risk Category: Importance Factor, Is: Flat Roof Snow Load, pf [psf]: Minimum Roof Snow Load, pm [psf]: Unobstructed Slippery Surface? Slope Factor Figure: Roof Slope Factor, Cs: 1.7 1.7 8 8 30 30 C C Fully Exposed Fully Exposed 0.9 0.9 1.1 1.1 Il I'I 1.0 1.0 30 30 30 30 No No Figure 7-2b Figure 7-2b 1.00 1.00 30 30 30 30 ASCE 7-10, Section 7.2 ASCE 7-10, Table 7-2 ASCE 7-10, Table 7-2 ASCE 7-10, Table 7-2 ASCE 7-10, Table 7-3 ASCE 7-10, Table 1.5-1 ASCE 7-10, Table 1.5-2 ASCE 7-10, Equation 7.3-1 ASCE 7-10, Section 7.3.4 ASCE 7-10, Section 7.4 ASCE 7-10, Section 7.4 ASCE 7-10, Figure 7-2 Sloped Roof Snow Load, ps [psf]:ASCE 7-10, Equation 7.4-1 Design Snow Load, S [psf]: ilyaf JOB NO.: 02001-1542-181 �YECTOR SUBJECT; BEAMS PROJECT: Ryan Vinoche Residence DESIGN LOADS: Load Types: Snow Live Dead Size 2x8 Existing Roof 30 20 7 1.15 0.4 Proposed PV Array 30 0 10 1.5 1.8 0.9 wDL Loads Label rafters (ft) Trib (ft) Length 17.67 (plo Actual Allow Check # Plies (1) Grade DFL#2 BM/HDR Size 2x8 Cr 1.15 CD 1.15 CRR 1.20 M (ft -Ib) 2057.0 1564 1.3 V (lb) 437.1 1501 0.3 ALL (in) 0.8 0.9 0.9 ADL (in) 0.4 1.8 0.2 ATL (in) 1.5 1.8 0.9 LL (lb) DL (lb) Total Rai 353 1 114 1 467 (left side) Rbj 353 1 101 1 454 (right side) INCLUDE BM SELF WEIGHT? No SHOW ALLOWABLE LOADS ON GRAPHS? YES Add'I Array Loads Floor Roof Trib Wall Trib (ft) (ft) Trib (ft) Floor AM] Dead Load (plo Live Ad Dead wLL (plf) wDL (plf) 2 Existing Roof Trib Wall Load Load Bm wt wLL wDL Loads Trib (ft) (ft) Trib (ft) (plo (plo (plo (plf) (plf) 1 1.333 1 1 1 0 40 10 Add'I Array Loads Floor Roof Trib Wall Trib (ft) (ft) Trib (ft) Aam Live Load (plo AM] Dead Load (plo Dist to Load 'a' (ft) Lengin of Load 'b' (ft) wLL (plf) wDL (plf) 2 0 4 0.7 11 0 4 3 4 5 6 Capacities where single 2x8 Deflection Criteria OTLall—= L/ 120 ALLalbw U1240 ZaIIw= D120 LOAD 60 50 40 30 20 10 0 0 5 10 15 20 2000 1500 1000 500 0 zoo -1000 -1500 -2000 SHEAR (LB) 2500 2000 1500 1000 500 0 0 5 MOMENT (FT -LB) 10 i 15 20 retrofit middle third city of heat �'/v*9 DiviSNO' JOB NO.: U2001-1542-181 SUBJECT: BEAMS �YECTOR r PROJECT: Ryan Vinoche Residence DESIGN LOADS: Load Types: Snow Live Dead Existing Roof 30 20 7 Proposed PV Array 30 0 10 Label rafters Length 17.67 Actual Allow Check # Plies (2) Grade DFL#2 BM/HDR Size 2x8 Cr 1.15 CD 1.15 CF,V 1.20 M (ft -Ib) 2057.0 3128 0.7 V (lb) 437.1 3002 0.1 ALL (in) 0.4 0.9 0.4 ADL (in) 0.2 1.8 0.1 ATL (in) 0.8 1.8 0.4 LL (lb) DL (lb) Total Raj 353 1 114 467 (left side) Rbj 353 1 101 1 454 (right side) INCLUDE BM SELF WEIGHT? No SHOW ALLOWABLE LOADS ON GRAPHS? YES Add'1 Array Loads Floor Roof Trb Wall Trib (ft) (ft) Trib (ft) Floor ACM Dead Load (plf) Live Dead WILL wDL (plf) (plf) 2 20 Existing Roof Trib Wall Load Load Bm wt WILL wDL Loads Trib (ft) (ft) Trib (ft) (plf) (plf) Of) (plf) (plf) 1 1.333 1000 1 1 0 1 40 10 Add'1 Array Loads Floor Roof Trb Wall Trib (ft) (ft) Trib (ft) Add'l Live Load (pif) ACM Dead Load (plf) Dist to Load 'a' (ft) Lengtn of Load 'b' (ft) WILL wDL (plf) (plf) 2 20 0 4 0.7 11 0 4 3 SHEAR (LB) 4000 4 2000 5 1000 0 6 5 10 1 s 20 -1000 -2000 Capacities where sistered (middle 2/3 of span) Deflection Criteria ATLaibw= U 120 �LLalbw L/ 240 ODLa�bw= L/1120 LOAD 60 50 40 30 20 10 0 0 5 10 15 20 SHEAR (LB) 4000 3000 2000 1000 0 5 10 1 s 20 -1000 -2000 -3000 4000 MOMENT (FT -LB) 3500 3000 2500 2000 1500 1000 500 0 0 5 10 15 20 R e n G j n e e R s '10 PROJECT: Ryan Vinoche Residence JOB NO.: U2001-1542-181 SUBJECT: SOLAR LAYOUT ?, I -, . PITCHA" MRF17% City (),,, Wheat Ridge "V/09 L)`,i\oo GENERAL NOTES 1. ALL WORK SHALL COMPLY WITH 2017 NATIONAL ELECTRIC CODE (NEC), 2015 INTERNATIONAL RESIDENTIAL CODE (IRC), 2014 NATIONAL BUILDING CODE (NBC), 2015 INTERNATIONAL BUILDING CODE (IBC), 2015 INTERNATIONAL PLUMBING CODE (IPC), AND ALL STATE AND LOCAL BUILDING, ELECTRICAL, AND PLUMBING CODES. 2. DRAWINGS HAVE BEEN DETAILED ACCORDING TO UL LISTING REQUIREMENTS. 3. TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS (WHEN PROVIDED) IN ACCORDANCE WITH NEC CODE 110.14(D) ON ALL ELECTRICAL CONNECTIONS. SITE NOTES 1. A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 2, THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS AN UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 3. THE SOLAR PV INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS, 4. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION [NEC 110.261 5. THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL (OR INVERTER) IF SMALLER THAN #6 AWG COPPER WIRE PER NEC 250-64B. THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS AT BUSBARS WITHIN LISTED EQUIPMENT PER [NEC 250.64C.] 6. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SHALL SERVE TO PROTECT THE BUILDING OR STRUCTURE. 7. RIGID CONDUIT (AND/OR NIPPLES) MUST HAVE A PULL BUSHING TO PROTECT WIRES, 8. BOLTED CONNECTION REQUIRED IN DC DISCONNECTS ON THE WHITE GROUNDED CONDUCTOR (USE POLARIS BLOCK OR NEUTRAL BAR) 9. ANY CONNECTION ABOVE LIVE PARTS MUST BE WATERTIGHT. REDUCING WASHERS DISALLOWED ABOVE LIVE PARTS, MEYERS HUBS RECOMMENDED 10, UV RESISTANT CABLE TIES(NOT ZIP TIES) USED FOR PERMANENT WIRE MANAGEMENT OFF THE ROOF SURFACE IN ACCORDANCE WITH NEC 110.2.110.3(A -B). 300.4 11. SOLADECK JUNCTION BOXES MOUNTED FLUSH WrJ/ROOF SURFACE TO BE USED FOR WIRE MANAGEMENT AND AS FLASHED ROOF PENETRATIONS FOR INTERIOR CONDUIT RUNS, SOLAR CONTRACTOR 1. MODULE CERTIFICATIONS WILL INCLUDE UL1703, IEC61646, IEC61730. 2. IF APPLICABLE. MODULE GROUNDING LUGS MUST BE INSTALLED AT THE MARKED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 3. AS INDICATED BY DESIGN, OTHER NRTL LISTED MODULE GROUNDING DEVICES MAY BE USED IN PLACE OF STANDARD GROUNDING LUGS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. 4. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. 5. CONDUIT POINT OF PENETRATION FROM EXTERIOR TO INTERIOR TO BE INSTALLED AND SEALED WITH A SUITABLE SEALING COMPOUND. 6. DC WIRING LIMITED TO MODULE FOOTPRINT W/ ENPHASE AC SYSTEM. 7. EN PHASE WRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS. 8. MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC UNLESS NOT AVAILABLE. 9. ALL INVERTERS, MOTOR GENERATORS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AC PHOTOVOLTAIC MODULES, DC COMBINERS, DC -TO -DC CONVERTERS,SOURCE CIRCUIT COMBINERS, AND CHARGE CONTROLLERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (B). 10. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. EQUIPMENT LOCATIONS 1. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY [NEC 110.261. 2. EQUIPMENT INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY [NEC 690.31 (A) -(B)] AND [NEC TABLE 310,15 (B)]. 3. ADDITIONAL AC DISCONNECTS SHALL BE PROVIDED WHERE THE INVERTER IS NOT ADJACENT TO THE UTILITY AC DISCONNECT, OR NOT WITHIN SIGHT OF THE UTILITY AC DISCONNECT. 4. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 5, ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. ASCE 7-10 WIND SPEED: 136 MPH OCCUPANCY -R3 GROUND SNOW LOAD: 30 PSF CONSTRUCTION - V -B EXPOSURE CATEGORY: C ZONING: RESIDENTIAL SEISMIC DESIGN CATEGORY: B 140101e7113e7lmom DC SYSTEM SIZE: 3.3 kW DC ROOF TYPE: Mod Bitumen / Rolled Comp MODULES: (11) Trinasolar 300 TSM-DD05A.08(II) INVERTER(S): Enphase IQ7-60-2-US,---- RACKING: UNIRAC SOLARMOUNT LT Mounting & Racking System ♦„I ANCHORED 0 C' Of� UL LISTED RACKING SYSTEM TO uN17Y DtvuMMEW APPROVED PCompliarm GUY of F, A)Ilqlll Wheat Ridge xamiher yeft n�o7 g`o� noV-171 19 soft* oldm0em-ANNwetd r -1,s ewnofoarlr&*A"M af Owcry Awnotbt"" Nor- tLUE RAVEN �•, j����_ , 1220 S. 630 E STE. 430 AMERICAN FORK. UT 84003 800-377-4480 W WW%1.BLUERAVE NSOLAR.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE - EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLARLLC. O r co LJJ UJCO 00 0 z � C) � z G) Q ® ` Q It W 000 z �O U0 Q�� E W C) U In W Fx ft ON SITE P PV1 - COVER SHEET ALL Project PV2 - PROPERTY PLAN SublM to Field Ir PV3 - SITE PLAN PV4 - EQUIPMENT--& ATTACHMENT DETAIL PV5 - ELECTRICAL SINGLE LINE DIAGRAM PV6 - ELECTRICAL CALCULATIONS & STRING DIAGRAM PV7 - MBD CALCS. (IF NEEDED) PV8 - LABELS & LOCATIONS PV9 - STRING & SE OPTIMIZER PV10 - PLACARD (IF NEEDED - NEC 690.56(B)) Vector Structural Engineering has reviewed the existing structure with loading from the solar array and lag screw connections to the existing framing. The design of the racking system, connections, and all other structure is by others. \LECTOR E ^ o i n E E R S 1 W. GALENA PARK BLVD., SUITE 101 P: (801) 990-1775 ;APER, UT M020 F: (801) 990-1776 VSE Project No.: U2001-1542-171 8/2018 Expires 10/31/2019 kus SPECTI(.I CD O Co 1 �s-- O co [,L,[ o C.) N CO Q'M W OS N Cl) 0 _ W > c z CD M Ir c Q CIS DftANdNG BY DAA d September 6, 2018 PROJECT NUMBER 53805376 SHEET NAME COVER SHEET PAGE NUMBER REVISION PV1 0 DC SYSTEM SIZE: 3.3 kW DC ROOF TYPE: Mod Bitumen / Rolled Camp 115'-8" 75-5° LEGEND N INV INVERTER & DC DISCONNECT BLUE RAVEN UJ ❑ d"y of LC FC oo�ioo 1220 S. 630 E STE. 430 0 \iECTOR AMERICAN FORK. UT 84003 E^: G I n E E R 8 651 W. GALENA PARK BLVD., SUITE 101 P: (801) 990-1775 AC DISCONNECT 800-377-4480 LL, © ❑ t^ WW.BLUERAVENSOLAR.COM I— UTILITY METER/ SERVICE PANEL ❑ Z Z HEREIN CONTAINED SHALL NOT BE 0 IY EE> USED FOR THE BENEFIT OF LL ❑ ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT z' o U C AC LPV MSP M BE DISCLOSED IN WHOLE OR IN a� 0 > 62)tY Z PART TO OTHERS OUTSIDE ❑ COMBINER BOX RECIPIENTS ORGANIZATION, o c') N MP1 AZIMUTH:180° PV 8 PV REVENUE METER PITCH:8° TSRF:77% 75-5° LEGEND INV INVERTER & DC DISCONNECT BLUE RAVEN SUB (E) SUBPANEL d"y of LC FC oo�ioo 1220 S. 630 E STE. 430 eatRidg \iECTOR AMERICAN FORK. UT 84003 75-5° 1 Expires 10/31/2019 LEGEND INV INVERTER & DC DISCONNECT BLUE RAVEN SUB (E) SUBPANEL d"y of LC FC (N) LOAD CENTER 1220 S. 630 E STE. 430 eatRidg \iECTOR AMERICAN FORK. UT 84003 E^: G I n E E R 8 651 W. GALENA PARK BLVD., SUITE 101 P: (801) 990-1775 AC DISCONNECT 800-377-4480 CD VSE Project No.: U2001-1542-171 t^ WW.BLUERAVENSOLAR.COM M UTILITY METER/ SERVICE PANEL CONFIDENTIAL -THE INFORMATION Z HEREIN CONTAINED SHALL NOT BE a USED FOR THE BENEFIT OF JB JUNCTION BOX ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT z' o U Lu N BE DISCLOSED IN WHOLE OR IN a� 0 > 62)tY Z PART TO OTHERS OUTSIDE ❑ COMBINER BOX RECIPIENTS ORGANIZATION, o c') N EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE PV 8 PV REVENUE METER EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF ®BLUERAVENSOLARLLC. FIRE SETBACK EMT CONDUIT RUN W LLI 4 O i (TO BE DETERMINED IN FIELD) � Z �j Q 'qt <t cS U0r-- ZUr Q PV WIRE STRING Ory co �CD MM W CD ('') 07 PROPERTY LINEU Q 0 U) W U m � o' SCALE: 1/16" = V-0" is sz' 0 n 1 Expires 10/31/2019 Vector Structural Engineering has reviewed the existing structure with loading from the solar array and lag screw connections to the existing d"y of framing. The design of the racking system, connections, and all other structure is by others. eatRidg \iECTOR n v(/;�d+n^ O\� E^: G I n E E R 8 651 W. GALENA PARK BLVD., SUITE 101 P: (801) 990-1775 y DRAPER, UT 84020 F: (801) 990-1776 CD VSE Project No.: U2001-1542-171 1 Expires 10/31/2019 DR.=;VV NG BY September 6, 2018 PROJECT NUMBER 53805376 SHEET NAME PROPERTY PLAN PAGE NUMBER REV;SON PV2 Q M co O CD Co Z a Q I— 75 a) z' o U Lu N Cr u- v a� 0 > 62)tY Z LLJ COQ } LLI U) c X o c') N Y M D c� DR.=;VV NG BY September 6, 2018 PROJECT NUMBER 53805376 SHEET NAME PROPERTY PLAN PAGE NUMBER REV;SON PV2 Q LEGEND INV INVERTER & DC DISCONNECT BLUE N SUB (E) SUBPANEL FC] (N) LOAD CENTER 1220 S. 630 E STE. 430 AMERICAN FORK; UT 84003 PAC AC DISCONNECT 800-377-4480 WW W.BLUERAVENSOLAR.COM M UTILITY METER 1 SERVICE PANEL CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF JB JUNCTION 60K ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE COMBINER BOX RECIPIENTS ORGANIZATION. EXCEPT IN CONNECTION WITH THE ❑ SALE AND USE OF THE RESPECTIVE PV PV REVENUE METER EQUIPMENT, WITHOUT THE 8 WRITTEN PERMISSION OF ® BLUERAVENSOLAR LLC. FIRE SETBACK Of C:) D oe w ( EMT CONDUIT RUN [[ w (TO BE DETERMINED IN FIELD) � z �t � O � C7 SKYL GHT d 00 U 0 ti = PV WIRE STRING z< 0 d B UJ n 75I—Lo F --7g ❑ I U ©00 Q PROPERTY LINE F-- y WU 0 m z --) Cl) 0 SCALE: 1/8" = V-0" 0 rv, Of LI- EEl c') C:) Co Z o C AC LP V MSP M 0 LU I— o N 2 rn U U) Cr v c cv w c6D LY U~) > Z ?� w c C:) U% U � D� :v��NG er Vector Structural Engineering has ---- reviewed the existing structure with loading from the solar array and lag O��Q kT screw connections to the existing y0� p..��F A September 6, 2018 City Of framing. The design of the racking MP1 system, connections, and all other : �� PROJECT NUL1BER AZIMUTH:180° structure is by others. _ �t3t: 53805376 DC SYSTEM SIZE: 3.3 kW DC Whe ROOF TYPE: Mod Bitumen I Rolled Com PITCH:B° at Rid. �'� . 812018.•,Q Comp TSRF:77% ��. \f ECTOR ,�Ftf'-., ..,.`�w� s-_TrJrjSITE PLAN (11) Trinasolar 300 TSM-DD05A.08(II) `dna Dr►�s�o E G E E R 1 �7,tNr #A•s' wl�} 651 W. GALENA PARK BLVD., SUITE 101 P: (601) 990-1775 NAI �` Enphase IQ7-60-2-US;----INVERTER DRAPER, UT M020 F:(801)990-1776 PAGE NUMBER RFV SI,N VSE Project No.: U2001-1542-171 Expires 10/31/2019 PV3 0 j�c (�c (�c (�c j�c 7JB �C �C �C �C [�C �C PV ARRAY STRUCTURAL CRITERIA PV MODULE COUNT: 11 MODULES # OF ATTACHMENT POINTS: 22 ARRAY AREA: Module Count x 17.51ft2 = 192.6ft2 ROOF AREA: 1763.2ft2 % OF ARRAY/ROOF: 10.9% ARRAY WEIGHT: Module Count x 50lbs = 550.Olbs DISTRIBUTED LOAD: Array Weight - Array Area = 286 lbs/ft' POINT LOAD: Array Weight _ Attachments = 25.0lbs/attachment CEILING JOIST OR BOTTOM CHORD SPACING:----"O.C. ASCE 7-10 WIND SPEED: 136 MPH SITE CRITERIA GROUND SNOW LOAD: 30 PSF UNIRAC PRO SERIES END CLAMP PV MODULE UNIRAC RAIL DETAIL, END CLAMP FRONT Scale: 3"= V-0" EXPOSURE CATEGORY: C SEISMIC DESIGN CATEGORY: D IK/AI, rKU JCKICJ ) CLAMP PV MODULE UNIRAC RAIL E DETAIL, MID CLAMP FRONT Scale: 3" = V-0" nv nnnni It C W TSM-DD05A.08(II) PV MODULE UNIRAC SOLARMOUNT LT RAIL BLUE Y E "-""-1-48" iJ7 MAX." I MAX. ARRAY DETAIL, FRONT VIEW / (�}} Scale. 3/8" = V-0" 1226 S. 630 E STE. 430 AMERICAN FORK: UT 84003 1.^.�VViN.BLUERAVENSOLAR.COt,9 UERA ENSO CONFIDENTIAL - THE INFORMATION ROOF TYPE: Mad Bitumen / Rolled Comp HEREIN CONTAINED SHALL NOT BE ROOF FRAMING TYPE: Rafter USED FOR THE BENEFIT OF ANYONE EXCEPT RAFTER OR TOP CHORD SIZE: 2x8 BLUERAVENSOLAR NOR SHALL IT RAFTER OR TOP CHORD SPACING: 16"O.C. UNIRAC SOLARMOUNT LT RAIL BE DISCLOSED IN WHOLE OR IN CEILING JOIST OR BOTTOM CHORD SIZE: None PART TN OTHERS OUTSIDE RECIPIENTS ORGANIZATION, CEILING JOIST OR BOTTOM CHORD SPACING:----"O.C. EXCEPT IN CONNEC TION WITH THE r SALE AND USE OF THE RESPECTIVE ECDFASTEN Sijp�pg" Base and Compression Plate _ EQUIPMENT, WITHOUT THE o�4� � p ••% WRITTEN PERMISSION OF BLUERAVENSOLAR LLC, H MAX w 10" MIN - Pv4 ;-� � >- C:) U1 0 V-4" '-8" MIN - ..--' 0 MAX i ..--- 2T-10" MAX 8 00 LU LL1 'T U �Z'- HO � `Z � U r)I Z � z Q -J �- == < (D oz Lu "? 2'-8" MIN _ `" .. — 75 I— LID f— E CD F c0z o CO T-10" MAX 00 ©CO ARRAY DETAIL, SIDE VIENOTE: RETROFITS REQUIRED PER W U m O C0 STRUCURAL LETTER PREPARED 651 W. GALENA PARK BLVD., SUITE 101 P: (801) 990-1775 Scale: 3/8" = V-0" BY VECTOR STRUCTURAL � ENGINEERING, DATED 10/17/2018 a UNIRAC SM L -FOOT DR4WNG BY Vector Structural Engineering has - c7 , Dr'. ` September 24, 2018 loading from the solar array and lag L . �� cit Y of UNIRAC SOLARMOUNT LT RAIL o�4� � p ••% o system, connections, and all other Wheat Ridge Ridge is by others. # gni co 53805376 Z r� p mss• 8/LO� U(�� 0 SHEET NAME -........ -__... --....--..........-_.......... ice/ ■ !r \`� .....•09 S �r U EQUIP. DETAIL 651 W. GALENA PARK BLVD., SUITE 101 P: (801) 990-1775 ALL PAGE NurnHER -W ECOFASTEN SIMPLE DRAPER, UT 84020 F: (801) 990-1776 0 0 N_ GRIP SQ STANDOFF ROOF LEVEL VSE Project No.: U2001-1542-171 (q Ci U) (N) D MASTIC ®LLl o 4" Z UI)) Z >- (E) ROOF W c o Cl) x 4"MEMBRANE U) Of m S ® ai U Scale: 3" = V-0" (E) BUILDING STRUCTURE ..,.NDP15-13X03 DR4WNG BY Vector Structural Engineering has - reviewed the existing structure with , Dr'. ` September 24, 2018 loading from the solar array and lag L . �� cit Y of screw connections to the existing framing. The design of the racking o�4� � p ••% PROJECT NUMBER system, connections, and all other Wheat Ridge Ridge is by others. # gni 53805376 [/�\�T ��\I E O! ��yrnoinEERs r� p mss• 8/LO� U(�� SHEET NAME n O� d ��5� 9 D ice/ ■ !r \`� .....•09 S �r U EQUIP. DETAIL 651 W. GALENA PARK BLVD., SUITE 101 P: (801) 990-1775 ALL PAGE NurnHER REVISION DRAPER, UT 84020 F: (801) 990-1776 PV4 0 VSE Project No.: U2001-1542-171 Expires 10/31/2019 (1J 10 AWG THWN-2, COPPER, BLACK (LINE 1) 11.0 AAC (1) 10 AWG THWN-2, COPPER, RED (LINE 2) 240 V ACr-3 (1) 10 AWGTHWN-2, COPPER, RED (POSITIVE) MAX 11.0 A AC (1) 10 AWGTHWN-2, COPPER, BLACK (NEGATIVE) 240 V AC (1) 10 AWGTHWN-2, COPPER, RED (POSITIVE) 2 (1) 10 AWG THWN-2, COPPER, BLACK (NEGATIVE) MAX 11.0 AAC 240 V AC (1) 12-2TC-ER,THWN-2, COPPER MAX 11.0 AAC 1 (1) 6 AWG BARE, COPPER (EGC) 240 V AC 11 10 AWG THWN-2, COPPER, WHITE (NEUTRAL) {1) 10 AWGTHWN-2, COPPER, GREEN (EGC) (1) 10 AWG THWN-2, COPPER, GREEN (EGC) /{1) (1) 10 AWG THWN-2, COPPER, GREEN (GROUND) OR 10- 2 OF-B W/G, SOLID COPPER (1) 3/4 INCH EMT CONDUIT (1) 3/4 INCH EMT CONDUIT (1) 3/4 INCH EMT CONDUIT E RAVEN 1220 S. 630 E STE. 430 AMERICAN FORK, UT 84003 800-377-4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE 1. ALL CONDUIT TO BE RAN AT LEAST 7/8" ABOVE ROOF SURFACE WHERE EXPOSED TO SUNLIGHT. USED FOR THE BENEFIT OF 2, TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS WHEN ( ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT PROVIDED) IN ACCORDANCE WITH NEC CODE 110.14(D) ON ALL ELECTRICAL CONNECTIONS. BE DISCLOSED IN WHOLE OR IN 3. CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND PART TO OTHERS OUTSIDE ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. RECIPIENTS ORGANIZATION. EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF (E)200A MAIN SERVICE PANEL (11) Trinasolar 300 TSM-DD05A.08(II) BLUERAVENSOLAR LLC. (E)200A 12P MAIN BREAKER UTILITY PV ENPHASE IQ COMBINER UL 1703 COMPLIANT PRODUCTION PV AC DISCONNECT X-IQ-AM1-240-2 METER 200A (11) Enphase IQ7-60-2-US MICRO INVERTERS j- r fn Q if O a- CO (E)200A / 2P LEVER BYPASS NON-FUSED (SOLAR LOADS ONLY) JUNCTION BOX(S) UL 1741 COMPLIANT LLI W d o METER SOCKET LOCKABLE , VISIBLE OPEN OPTIONAL IF 6 MODULES MAX FOR ALL SUB-BRANCH � Z d- � O � 30A, 240V, 2-POLE Q-CABLE (TC-ER) CIRCUIT(S) TO COMPLY WITH VRISE CALCS Q O>� Q (E)LOADS USED FO ENTIRE M jJUNCTION OMERUN Q (�(I BOX LO zIJ._ CIO OOD(N)20A (N)20A 2P P (1) CIRCUITOF 11 MODULES LIjC) AN, 120/240 VAC60HZTO UTILITY GRID 3 2 1 G PV BREAKER TO BE LOCATED OPPOSITE END OF BUSSING FROM MAIN BREAKER (E) GROUNDING ELECTRODE O oD Z O o —LLJ I— Qa O N Q"Lr O CO Cf) PV Production meter notes: " °wx N -0 1. The self-contained metering will be in compliance Q v ca ILLI with the most recent revision of the Xcel Z O � 0 INTERCONNECTION NOTES Energy Standard; specifically Section 4.11. — 1. ONE OF THE METHODS THAT FOLLOWS SHALL BE USED TO DETERMINE THE RATINGS OF 2. The PV production meter will be required to have Z 0 Ll1 BUSBARS AND PANELBOARDS. (a) THE SUM OF 125 PERCENT OF THE INVERTER(S) OUTPUT the PV generation wired to the line side terminals O CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE (top of meter block).] �,y ❑ y BUSBAR SHALL NOT EXCEED THE AMPACITY OF THE BUS BAR. (b) WHERE TWO SOURCES, 3. The meter socket for the PV production meter shall ONE THE UTILITY AND THE OTHER AN INVERTER ARE LOCATED AT OPPOSITE ENDS OF A be marked with a stamped brass, aluminum, or DRNA']NG BY BUSBAR THAT CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE INVERTER(S) OUTPUT stainless steel tag, indicating the address including ---- CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE the unit, typically "PV PROD" in accordance with BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR [NEC the requirements for "Meter Identification" in Section DATE 705.12(D)(3)]. 4.14.4 of the Xcel Energy Standard. City Of 3. GROUND FAULT PROTECTION IN ACCORDANCE WITH [NEC 215.9] & [NEC 230.95] 4. The PV production meter shall be located within September 6; 201$ 4. ALL EQUIPMENT TO BE RATED FOR BACKFEEDING. ten (10) feet of the existing utility meter. If there PROJ. OT NUNIBER is any reason this cannot be accomplished, a site Wheat DISCONNECT NOTES plan showing proposed equipment locations Ridge 53805376 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS shall be submitted for review. The local meter for d� 4�% SHEET NAME shop must approve the site plan application . OPI OPENED THE CONDUCTORS REMAINING LIVE ARE CONNECTED TO THE �n9 D'►V�SN be TERMINALS MARKED "LINE SIDE" (TYPICALLY THE UPPER TERMINALS) approval; site meetings can arranged upon R � ELEC. OJ LINE DIAC'� request. 2. AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH NOTE TO INSTALLER: The current Placard that we require_- PAGE NUi4BEP. REVISION 3. DC CURRENT CONDUCTORS ARE TO REMAIN OUTSIDE OF BUILDING PRIOR TO at the utility meter and AC Disconnect is a yellow with blac a EITHER A FUSEABLE SOURCE CIRCUIT lettering 4. MODULE SFLCIFICA IONS I rinasolar 3UU 1 SM - RATED POWER (STC) MODULE VOC 300 W 40VDC MODULE VMP 33 V DC MODULE IMP 9.2 A DC MODULE ISC 9.8 A DC VOC CORRECTION (%/°C) -0.3 °C VMP CORRECTION (%/°C) -0.4 °C SERIES FUSE RATING 15 A DC ADJ. MODULE VOC @ ASHRAE LOW TEMP 45.3 V DC ADJ. MODULE VMP @ ASHRAE 2% AVG. HIGH TEMP 27.5 V DC MICRUINVER] ER SPECI FICA I IONS Enphase IQ/-bU-Z-US POWER POINT TRACKING (MPPT) MIN/MAX 22 - 48 V DC MAXIMUM INPUT VOLTAGE 48 V DC MAXIMUM DCSHORTCIRCUITCURRENT 15 A DC MAXIMUM USABLE DC INPUT POWER 350 W MAXIMUM OUTPUTCURRENT 1 AAC AC OVERCURRENT PROTECTION 20 A MAXIMUM OUTPUT POWER 250 W CEC WEIGHTED EFFICIENCY 97% AC PHOTOVOLATIC MODULE MARKING (NEC 69052) NOMINAL OPERATING AC VOLTAGE 240 V AC NOMINAL OPERATING AC FREQUENCY 47- 68 HZAC MAXIMUM AC POWER 240 VA AC MAXIMUM AC CURRENT 11.0 A AC MAXIMUM OCPD RATING PER CIRCUIT 20 A AC DESIGN LOCATION AND TEMPERATURES TEMPERATURE DATA SOURCE ASHRAE 2% AVG. HIGH TEMP STATE Colorado CITY Wheat Ridge WEATHER STATION DENVER/CENTENNIAL ASHRAE EXTREME LOW TEMP (°C) -23 ASHRAE 2% AVG. HIGH TEMP (°C) 33 SYSTFM F1 FCTRICAI SPFCIFICATIONS CIR 1 CIR 2 CIR 3 CIR 4 CIR 5 CIR 6 NUMBER OF MODULES PER MPPT DC POWER RATING PER CIRCUIT (STC) TOTAL MODULE NUMBER STC RATING OF ARRAY AC CURRENT @ MAX POWER POINT (IMP) MAX. CURRENT (IMP X 1.25) OCPD CURRENT RATING PER CIRCUIT MAX. COMB. ARRAY AC CURRENT (IMP) MAX. ARRAY AC POWER 11 3300 %VRISE IQ7-6 VRISE SEC. 1 (MICRO TO JBOX) 21.6 0.52 240.52 0.22% VRISE SEC. 2 (JBOX TO COMBINER BOX) 11 MODULES 330OW DC 11.0 13.75 20 5 0.14 240.14 0.06% TOTAL VRISE CONDUCTOR RATING = 0.39% 11.0 264OW AC AC VOLTAGE RISE CALCULATIONS DIST (FT) JRISE(V) VEND(V) %VRISE IQ7-6 VRISE SEC. 1 (MICRO TO JBOX) 21.6 0.52 240.52 0.22% VRISE SEC. 2 (JBOX TO COMBINER BOX) 10 0.28 240.28 0.12% VRISE SEC. 3 (COMBINER BOXTO POI) 5 0.14 240.14 0.06% TOTAL VRISE CONDUCTOR RATING = 0.39% PHOTOVOLTAIC AC DISCONNECT OUTPUT LABEL (NEC 690.54) AC OUTPUT CURRENT 11.0 A AC NOMINAL AC VOLTAGE 240 V AC GROUNDING NOTES 1. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH [NEC 690-471 AND [NEC 250-501 THROUGH [NEC 250-60] SHALL BE PROVIDED. PER NEC, GROUNDING ELECTRODE SYSTEM OF EXISTING BUILDING MAY BE USED AND BONDED TO AT THE SERVICE ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, OR IS ONLY METALLIC WATER PIPING, A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT GROUND ROD WITH ACORN CLAMP. 2. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN #8 AWG AND NO GREATER THAN #6 AWG COPPER AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM. 3. PV SYSTEM SHALL BE GROUNDED IN ACCORDANCE TO [NEC 250.211, [NEC TABLE 250.122], AND ALL METAL PARTS OR MODULE FRAMES ACCORDING TO [NEC 690.46]. 4. MODULE SOURCE CIRCUITS SHALL BE GROUNDED IN ACCORDANCE TO [NEC 690.42]. 5. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDED CONDUCTOR TO ANOTHER MODULE. 6. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTIONS POINTS IDENTIFIED IN THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 7. ENCLOSURES SHALL BE PROPERLY PREPARED WITH REMOVAL OF PAINT/FINISH AS APPROPRIATE WHEN GROUNDING EQUIPMENT WITH TERMINATION GROUNDING LUGS. 8. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR DIRECT BURIAL. 9. GROUNDING AND BONDING CONDUCTORS SHALL BE COPPER, SOLID OR STRANDED, AND BARE WHEN EXPOSED. 10. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZE ACCORDING TO [NEC 690.45] AND BEA MINIMUM OF #10AWG WHEN NOT EXPOSED TO DAMAGE (#6AWG SHALL BE USED WHEN EXPOSED TO DAMAGE). 11. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLOR CODED GREEN (OR MARKED GREEN IF #4 AWG OR LARGER) 12. ALL CONDUIT BETWEEN THE UTILITY AC DISCONNECT AND THE POINT OF CONNECTION SHALL HAVE GROUNDED BUSHINGS AT BOTH ENDS. 13. SYSTEM GEC SIZED ACCORDING TO [NEC 690.471. [NEC TABLE 250.661, DC SYSTEM GEC SIZED ACCORDING TO [NEC 250.1661, MINIMUM #8AWG WHEN INSULATED, #6AWG WHEN EXPOSED TO DAMAGE. 14. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH 250.134 OR 250.136(A) REGARDLESS OF VOLTAGE. WIRING & CONDUIT NOTES 1. ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS PURPOSE AND APPROVED FOR THE SITE APPLICATIONS 2. ALL PV CABLES AND HOMERUN WIRES BE TYPE USE -2, AND SINGLE -CONDUCTOR CABLE LISTED AND IDENTIFIED AS PV \HIRE, TYPE TC -ER, OR EQUIVALENT: ROUTED TO SOURCE CIRCUIT COMBINER BOXES AS REQUIRED 3. ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED ACCORDING TO [NEC 690.81 FOR MULTIPLE CONDUCTORS 4. ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE INSTALLED ATLEAST 7,18" ABOVE THE ROOF SURFACE AND DERATED ACCORDING TO [NEC TABLE 310.15 (13)(2)(6), NEC TABLE 310.15(13)(3)(a),& NEC 310.15(13)(3)(c)]. 5. EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE -2, 90°C RATED, WET AND UV RESISTANT, AND UL LISTED RATED FOR 600V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT WIRE FROM SHARP EDGES CONDUCTOR SIZF CALCULATIONS MICROINVERTERTO JIAX. SHORT CIRCUIT CURRRENT (ISC) = 11.0 AAC JUNCTION BOX MAX. CURRENT (ISC X1.25) = 13.8 A AC CONDUCTOR (TC -ER, COPPER (90°C)) = 12 AWG CONDUCTOR RATING = 30 A AMB. TEMP. AMP. CORRECTION = 0.96 ADJUSTED AMP. = 28.8 > 13.8 JUNCTION BOX TO JIAX. SHORT CIRCUIT CURRRENT (ISC) = 11.0 A AC COMBINER BOX MAX. CURRENT (ISC X1.25) = 13.8 A AC INDUCTOR (THWN-2, COPPER (90°C)) = 10 AWG CONDUCTOR RATING = 35 A CONDUIT FILL DERATE = 1 AMB. TEMP. AMP. CORRECTION = 0.76 ADJUSTED AMP. = 26.6 > 13.8 EGC ISC = 11.0 A AC MAX. CHAN N EL ISC = 13.8 A AC INDUCTOR (THWN-2, COPPER (90°C)) = 10 AWG EGC CONDUCTOR RATING = 20 A CONDUITFILLDERATE= 1 AMB. TEMP. AMP. CORRECTION = 0.76 ADJUSTED AMP. = 15.2 > 13.8 COMBINER BOX TO INVERTER RATED AMPS= 11.0 A AC MAIN PV OCPD MAX. CURRENT (RATED AMPS X1.25) = 13.75 A AC INDUCTOR (THWN-2, COPPER (75°C)) = 10 AWG CONDUCTOR RATING = 35 A CONDUIT FILLDERATE = 1 AMB. TEMP. AMP. CORRECTION = 0.96 ADJUSTED AMP. = 33.6 > 13.8 6. PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHN(THWN-2 INSULATED, 90`C RATED, WET AND UV RESISTANT, RATED FOR 600V 7. 4 -WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER VOLTAGE TO GROUND MARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE MEANS. 8. ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION 9. VOLTAGE DROP LIMITED TO 2% FOR DC CIRCUITS AND 3% FOR AC CIRCUITS 10. NEGATIVE GROUNDED SYSTEMS DC CONDUCTORS SHALL BE COLOR CODED AS FOLLOWS: DC POSITIVE- RED (OR MARKED RED), DC NEGATIVE- GREY (OR MARKED GREY) 11. POSITIVE GROUNDED SYSTEMS DC CONDUCTORS COLOR CODED: DC POSITIVE- GREY (OR MARKED GREY), DC NEGATIVE- BLACK (OR MARKED BLACK) 12. AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE A OR L1- BLACK, PHASE B OR 1_2- RED, PHASE C OR L3- BLUE, NEUTRAL- WHITE,•'GRAY USE -2 IS NOT INDOOR RATED BUT PV CABLE IS RATED THWN,7HWN-2 AND MAY BE USED INSIDE ., USE -2 IS AVAILABLE AS UV WHITE 13. IF CONDUIT DETERMINED TO BE RAN THROUGH ATTIC IN FIELD THEN CONDUIT WILL BE EITHER EMT, FMC, OR MC CABLE IF DC CURRENT COMPLYING WITH NEC 690.31, NEC 250.118(10). DISCONNECTING MEANS SHALL COMPLY WITH 690.13 AND 690.15 14. CONDUIT RAN THROUGH ATTIC WILL BE AT LEAST 18" BELOW ROOF SURFACE COMPLYING WITH NEC 230.6(4) AND SECURED NO GREATER THAN 6' APART PER NEC 330.30(B), BLUE RAVEN 1220 S. 630 E STE. 430 AMERICAN FORK, UT 84003 800-377-4480 ":N\/''. BLU ERA\/EN SOLAR. COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, \NITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. LL! T_ CW 9 Z LL' CS Z ::) rn Q (} d- 00 UOco W U U) O IY Z _O F - Q O LL E_ LLL I- U) G W N C!} W F_ U) C1) DRAWING BY DATE September 6, 2018 PROJE;,T N:iMBER 53805376 city J of HEET NMOE 7" ELEC. CALcs. meat Rid,,e PAGE NUi•1BER REVISION PV6 1 Q U cy) C6 ELECTRIC SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SINES AWAY BE ENERGIZED IN THE OPEN POSITION DIRECT CURRENT PHOTOVOLTAIC POVVER SOURCE VOLTAGEMAXIMUM R MAX CIRCUIT CURRENT AMPS RATED AC OUTPUT CURRENT A NOMINAL OPERATING AC VOLTAGE V LABEL 1 FOR PV DISCONNECTING MEANS WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION. [NEC 690.13(B), NEC 705.22) LABEL AT EACH DC DISCONNECTING MEANS, INCLUDING THE DC DISCONNECT AT THE INVERTER. [NEC 690.53, NEC 690,13(B)] LABEL 3 AT POINT OF INTERCONNECTION, MARKED AT AC DISCONNECTING MEANS. [NEC 690.54, NEC 690.13 (B)] INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RA71'NG OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPAOTY OF BUSBAR. MEa "M I M ,. - , RAPID SHUTDOWN NOT IM LABEL 5 PLACED ADJACENT TO THE BACK -FED BREAKER FROM THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE CONNECTION TO BUSBAR. [NEC 705.12(13)(2)(3)(b)] LABEL 6 (ONLY IF 3 OR MORE SUPPLY SOURCES TO A BUSBAR) SIGN LOCATED AT LOAD CENTER IF IT CONTAINS 3 OR MORE POWER SOURCES. [NEC 705.12(13)(2)(3)(C)] LABEL 11 SIGN LOCATED AT AC COMBINER BOX FOR ALL MICRO -INVERTER; AC MODULE INSTALLS (IF APPLICABLE). LABELING NOTES: 1. LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. 2, LABELING REQUIREMENTS BASED ON THE 2017 NATIONAL ELECTRIC CODE, OSHA STANDARD 19010.145, ANSI Z535. 3 MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 4. LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED [NEC 110.21] 5. LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8", WHITE ON RED BACKGROUND, REFLECTIVE AND PERMANENTLY AFFIXED [IFC 605.11.1.11 SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUMOWN TURN RAPID SHUTDOWN SWITCH TO THE 'OFF' POSITION TO L c STJT DOWN PV SYSTEM AND REDUCE SHOCKHAZARO M IN THEARRAY LABEL 7 AT DIRECT-CURRENT EXPOSED RACEWAYS, CABLE TRAYS, COVERS AND ENCLOSURES OF JUNCTION BOXES, AND OTHER WIRING METHODS: SPACED AT MAXIMUM 10FT SECTION OR WHERE SEPARATED BY ENCLOSURES. WALLS, PARTITIONS, CEILINGS, OR FLOORS. [NEC 690.31(G)(3&4)] LABEL 8 FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. ;NEC 690.56(C)(1)(A)] LABEL 9 FOR PV SYSTEMS THAT ONLY SHUT DOWN CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(B)] LABELING DIAGRAM FOR MICRO INV MAIN SERVICE PANEL PHOTOVOLTAIC SYSTEM CONNECTED PV AC DISCONNECT LABEL 10 SIGN LOCATED AT RAPID SHUT DOWN DISCONNECT SWITCH [NEC 690.56(C)(3)]. LABEL 12 PLACARD TO BE PLACED AT THE MAIN BILLING METER PER XCEL ENERGY. LABEL 13 PLACARD TO BE PLACED AT AC DISCONNECT PER XCEL ENERGY. LABEL 4 ' AT POINT OF INTERCONNECTION FOR EQUIPMENT PV COMBINER SUBPANEL - CONTAINING OVERCURRENT DEVICES IN CIRCUTS ALL ELECTRIC POWER SOURCE SUPPLYING POWER TO A BUSBAR OR CONDUCTOR DUAL POWER SUPPLY SUPPLIED FORM MULTIPLE SOURCES, EACH SERVICE SOURCES: UTILITY GRID AND EQUIPMENT AND ALL ELECTRIC POWER PRODUCTION PV SOLAR ELECTRIC SYSTEM SOURCE LOCATIONS. �,0 [NEC 705.12(B)(3)] INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RA71'NG OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPAOTY OF BUSBAR. MEa "M I M ,. - , RAPID SHUTDOWN NOT IM LABEL 5 PLACED ADJACENT TO THE BACK -FED BREAKER FROM THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE CONNECTION TO BUSBAR. [NEC 705.12(13)(2)(3)(b)] LABEL 6 (ONLY IF 3 OR MORE SUPPLY SOURCES TO A BUSBAR) SIGN LOCATED AT LOAD CENTER IF IT CONTAINS 3 OR MORE POWER SOURCES. [NEC 705.12(13)(2)(3)(C)] LABEL 11 SIGN LOCATED AT AC COMBINER BOX FOR ALL MICRO -INVERTER; AC MODULE INSTALLS (IF APPLICABLE). LABELING NOTES: 1. LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. 2, LABELING REQUIREMENTS BASED ON THE 2017 NATIONAL ELECTRIC CODE, OSHA STANDARD 19010.145, ANSI Z535. 3 MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 4. LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED [NEC 110.21] 5. LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8", WHITE ON RED BACKGROUND, REFLECTIVE AND PERMANENTLY AFFIXED [IFC 605.11.1.11 SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUMOWN TURN RAPID SHUTDOWN SWITCH TO THE 'OFF' POSITION TO L c STJT DOWN PV SYSTEM AND REDUCE SHOCKHAZARO M IN THEARRAY LABEL 7 AT DIRECT-CURRENT EXPOSED RACEWAYS, CABLE TRAYS, COVERS AND ENCLOSURES OF JUNCTION BOXES, AND OTHER WIRING METHODS: SPACED AT MAXIMUM 10FT SECTION OR WHERE SEPARATED BY ENCLOSURES. WALLS, PARTITIONS, CEILINGS, OR FLOORS. [NEC 690.31(G)(3&4)] LABEL 8 FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. ;NEC 690.56(C)(1)(A)] LABEL 9 FOR PV SYSTEMS THAT ONLY SHUT DOWN CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(B)] LABELING DIAGRAM FOR MICRO INV MAIN SERVICE PANEL PHOTOVOLTAIC SYSTEM CONNECTED PV AC DISCONNECT LABEL 10 SIGN LOCATED AT RAPID SHUT DOWN DISCONNECT SWITCH [NEC 690.56(C)(3)]. LABEL 12 PLACARD TO BE PLACED AT THE MAIN BILLING METER PER XCEL ENERGY. LABEL 13 PLACARD TO BE PLACED AT AC DISCONNECT PER XCEL ENERGY. JUNCTION BOX OR COMBINER BOX 'ELECTRICAL DIAGRAMS SHOWN ABOVE IS FOR LABELING PURPOSES ONLY, NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON PV5 OF 3 LINE DIAGRAM. PV5 LINE DIAGRAM TO REFLECT ACTUAL REPRESENTATION OF PROPOSED SCOPE OF WORK. BLUE RAVEN 1220 S. 630 E STE. 430 AMERICAN FORK, UT 84003 800-377-4480 W1,10'.BLU ERAVENSOLAR.COM CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT. WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. � i O Lli "t W (D Z Z M <( (Di F 00 U® co LIJ U —) CO IL OO ' PERMANENT DIRECTORY TO BE LOCATED AT PV COMBINER SUBPANEL - MAIN SERVICE EQUIPMENT LOCATION IF ALL ALL ELECTRIC POWER SOURCE ELECTRICAL POWER SOURCE DISCONNECTING DISCONNECTING MEANS GROUPED AND MEANS (SOLAR ARRAY RAPID SHUTDOWN LABELED WITHIN iia FT AND LINE OF SITE SWITCH) ARE GROUPED AND IN LINE OF SITE OF OF THIS LOCATION MAIN SERVICE DISCONNECTING MEANS, �,0 [NEC 690.56(C) & NEC 705.10]. JUNCTION BOX OR COMBINER BOX 'ELECTRICAL DIAGRAMS SHOWN ABOVE IS FOR LABELING PURPOSES ONLY, NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON PV5 OF 3 LINE DIAGRAM. PV5 LINE DIAGRAM TO REFLECT ACTUAL REPRESENTATION OF PROPOSED SCOPE OF WORK. BLUE RAVEN 1220 S. 630 E STE. 430 AMERICAN FORK, UT 84003 800-377-4480 W1,10'.BLU ERAVENSOLAR.COM CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT. WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. � i O Lli "t W (D Z Z M <( (Di F 00 U® co LIJ U —) CO IL OO EXISTING SUB PANEL (IF WHERE POINT OF co PV COMBINER SUBPANEL - 12 O 1 INTERCONNECTION IS I.AADE) AC DISCONNECT IF USED TO COMBINE PV OUTPUT CIRCUITS AC JUNCTION BOX OR AC COMBINER BOX °° 8 OR �,0 oo a � CD 4 co GOR O _® I- PLACARD e 1 O Z L1J (D q E-> > c cz Q> z o CV on, Qy � W (!} 7- Ct} U 11 (ONLY C INTERCONNECTIO (ONLY IF PV NTERCONNECTIO CONSISTS OF LOA SIDE BREAKER ONSISTS OF LOA SIDE BREAKER) LABELING DIAGRAM FOR STRING INV. 1 DC OPTIMIZER INV.: MAIN SERVICE PANEL EXISTING SUB PANEL (IF WHERE POINT OF PV COMBINER SUBPANEL - INVERTER (S) INTERCONNECTION IF USED TO COMBINE 12 /U4, 1 B IS MADE) AC{ DISCONNECT PV OUTPUT CIRCUITS O 0 14 OR O � PLACARD oc (ONLY IF PV INTERCONNECTION (ONLY IF PV NTERCONNECTIO 1 ) 1 U CONSISTS OF LOA ONSISTS OF LOA SIDE BREAKER) f F ° t 2 0 SIDE BREAKER) INTEGRATED DC DISCONNECT JUNCTION BOX OR COMBINER BOX 'ELECTRICAL DIAGRAMS SHOWN ABOVE IS FOR LABELING PURPOSES ONLY, NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON PV5 OF 3 LINE DIAGRAM. PV5 LINE DIAGRAM TO REFLECT ACTUAL REPRESENTATION OF PROPOSED SCOPE OF WORK. BLUE RAVEN 1220 S. 630 E STE. 430 AMERICAN FORK, UT 84003 800-377-4480 W1,10'.BLU ERAVENSOLAR.COM CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT. WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. � i O Lli "t W (D Z Z M <( (Di F 00 U® co LIJ U —) CO IL DRAWING BY DATE September 6, 2018 PROJECT NUMBER 53805376 SHEETNAME LABELS PAGE NUMBER REVISION PV8 1 0 U 0 CJ co co 0 CD co Z O _® I- g tZ o W N O Z L1J (D q E-> > c cz Q> z o CV on, Qy � W (!} 7- Ct} U DRAWING BY DATE September 6, 2018 PROJECT NUMBER 53805376 SHEETNAME LABELS PAGE NUMBER REVISION PV8 1 0 U 0 CJ E Enphase IQ 7 and The high -pm tired smart grid-rea&y Enphase IQ 7 Micro- and Enphase 10 7+ Micro - IQ7+ dramartica Ily simplify the installation process w hile achieving the highest System efficlency. Microinverters To team more about Enphase offer "-,visitenphasexom Part of the Enphase 10 System, the 10 7 and IQ 7+ Microinverters integrate with the En phase IQ Envoy-, Enphase IQ Sattery-, and the Enphase Enlighten- monitoring and analysis softwaree. Its Series Microinverters, extend the reliability standards set forth by previous generations and undergo over a million hours of power -on testing? enabling Enphase to provide an industry-leading warranty of up to 25 years. Easy to Install • Ligfnweight and sirripie • Faster installatijon with improved, righter two -wire cabling Built-in rapid shutdown comptiant (NEC 2W14 & 2017,1 WMIRTMI-TrIMMIT. M1.1 optmixed for high powered 610-cs-41 and 7-_� celiv modules More than a Million hIDUTS Of testing Clasg it double -insulated closure UL Nsted Smart Grid Ready Comphes with advanced grid suppwt voltage and fteqUerW-,y Tide -through requirerner-ft Rernotely updates to respond to changing grid reWirernents • Configuirahi6e for varying grid profiles Meets Q& Rule 21 f U L 1741 -SA) 1 4 74 i4ic s is acquired tc rpE t 72 i ll mo&I", Enphase IQ 7 and IQ 7+ Microinverters DATA (DC) IQ7-60-2-US / IQ7-60-B-US EQ7PLUS-72-2-US / IQ7PLUS-72-B-US _INPUT Commonly used module pairings', 235 W - 350 W + 235 W - 440 W + Module compatibility 60 -cell PV modules only 60 -cell and 72 -cell PV modules Maximum Input DC voltage 48 V 60V Peak power tracking voltage 27 V - 37 V 27 V - 45 V Operating range 16V -48V 16V -60V Min/Max start voltage 22 V / 48 V 22'V / 60 V Max DC short circuit current (module Isc) 15 A 15A Overvoltage class DC port 11 11 DC port backfeed current 0 A 0 A PV array configuration 1 x 1 ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IQ 7 Microinverter IQ 7+ Microinverter Peak output power 250 VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal,(L-L) voltage/range2 240 V / 208V/ 240 V1 208V/ 83-229V 211-264 V 183 229 V 211-264V 183-229 V Maximum continuous output current 1.0 A (240 V) 1.15 A (208 V7) 1.21 A (240 V) 1.39 A (208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47 -68 Hz 47-68 Hz AC short circuit fault current over 3 cycles 5,8 Arms 5.8 Arms Maximum units per 20 A (GL) branch circuit' 16 (240 VAC) 13 (208 VAC) 13 (2413 VAC) 11 (208 VAC) Overvoltage class AC port III III AC port backfeed current 0 A 0 A Power factor setting 1.0 1.0 Power factor (adjustable) 0.7 leading ... 0,7 lagging 0.7 leading 0.7 lagging EFFICIENCY @240 V @208 V 0.240 V @208 V 97k% 97, 6� Peak* CEC efficiency 6 % CEC weighted efficiency 97.0 % 970'a� 97,0 97,0 MECHANICAL DATA 0 < 00 0 Ambient temperature range . .. ............. . -40*C to +651C Relative humidity range 4% to 100% (condensing) Connector type (IQ7-60-2US & IQ7PLUS72-2-US) MC4 (or Amphenol H4 UTX with additional Q -DCC -5 adapter) Connector type (IQ7-60-B-US & IQ7PLUS-72-B-US) Friends PV2 k'MC4 intermateable). WC-) _-) U) Adaptors for modules with MC4 or UTX connectors: 0 W PV2 to MC4: order ECA -S20 -S22 Cl- PV2 to UTX: order ECA -S20 -S25 Dimensions (WyMxD) 212 Trim x 175 Tram x 30.2 mrin (without bracket) Weight 1.08 kg (2.38 lbs) Cooling Natural convection -No fins Approved for wet locations Yes Pollution degree PD3 Enclosure Class 11 double -insulated, corrosion resistant polymeric enclosure Environmental category / UV exposure rating NEMA Type -6 1 outdoor FEATURES Communication Power Line Communication (PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load -break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741 -SA) UL 62109-1,UL1741/IEEE1547, FCC Part 15 Class B, ICES -0003 Class B, CAN/CSA-022.2 NO. 1071-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC -2014 and NEC 2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer's instructions. 1. No enforced .DG/AC Yai:u. See rhe,compalibirty calculalof at 2. Nom ina Ivoltage range can be exiended beyond nomy. inal 'frequiredby1heutil;1 3. Limits rylayvafy, Refer In local requiremenislo deme 1henumberofmicroinveriers per branch in your area. To learn more about Enphase offerings, visit enphase.com ENPHASE. 62018np.ase llneg,y, A7rk0t,.s reserved.AktademarkF, of brands Used are tlbe proper;yo` _nphase Enemylrr.. NOW - BLUE RAVEI 1220 S. 630 E STE. 430 AMERICAN FORK, UT 84003 800-377-4480 WINW.BLUERAVENSOLAR.COM CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION. EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. 0 Uj 0 < 00 0 (D Z < O� ob 1-- 0 0 U) Z :D q) < < W z 00 > 0 1:0 0 0 < 00 WC-) _-) U) W 0 W D _j Cl- co city 0111. wheat Itlafzft — 71, y/7, 9 SHEET NAME DATA SHEET PAGE NUMBER REVISION Enphase IQ Combiner+ KEDEM12M Ll '%MNO#F LISTED To learn more about Enphase offerings, visit enphase.corn _1_heEnphaseJQCombir,­_',,* v,IhEnphase Q Envoy' consolidates interconnection equipment into a single enclfDsure and streamlines PV and storage insLailations by providing a consistent, pre -wired solution for residential applications. it Offers Up 10 fOLir 2 -pole input circuits and Ealon BR series busbar assembly - Smart Includes IQ Envoy Ior communication an a COntral Flexible networking supports WI -17i, Ethernet, or cellular Provides priodlucti[Dn metering and optional, consumption monitoring • Suppvrts Installation of the Enphase 0 Aggfegatcw 01 • Eaton EIR series parietboard intenor • Up to four 2 -pole branch circuits for 240 VAC plug-in breakers (net included) 80 Alotal PV or storage branch circuits DturablleNRTL-certjfjedNEMA type 3R enclasure Five-year warranty Ul-fisted Enphase IQ Combiner+ MODEL NUMBER 10 Combiner* X-IQAM1-24'8-2 1 mt- ne,+ withEnphase IQ Envoy-foiJintegrated reyepuepFade PV production me,enn; S ®. ZD 4- 0.5N and optionat* coa�starnption manitai­$ng ;+,­ 2, 50 ACCESSORIES forder separately) EAphase Mobike Comect- CSLL M 0 OEM -23.( 132 -year data plan) Plug andplay industrial grade ceDutaT motieirn with data plan foc systeirs u -_ to 60 CELLMODEM-01 0 1 5 -year data plan) (Available in the US, Canada, Mexim, Puerto Rica, and the :IS Virgin Islands, CELL ;A -Mi (46 LTE CAT-M`i 5jeardate: plan wherethere is adequate cellular semce in, #* mstagaboin sffa.) Consumption Monitoring CT rT-200-SFLIT Sara care turrr-nt t a r:-fwmers enable viliole home consumptkmf metering* Circuit ureaksrs BRK-15A-Z-2,40 Weskcr, 2 ptife. 15A. Eaton ER215 BRK-220A2240 smaker, Z pol e. 2 -r -A, Ektoa BR220 ELECTWAL SPECIFICATIONS ............... .. . ........ . .............. Ner- BLUE RAVEN 1220 S. 630 E STE. 430 AMERICAN FORK, UT 84003 800-377-4480 WWW. BLU ERAV ENSOLAR,COM CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION. EXCEPT IN CONNEG TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. Rating Gontiatious duty g System, voltage 1-40 VAC, 60 RZ Ljj WC:) t 0 < 00 z-t_j -T Eatom BR series bus"T rating 1 2_5 A (D < Ob U0 r__ Max- con; ir, uo cup rent rating to uto ut W grid) 65 A Z < U) I- 0'_ Z Max- iriscircuitrafmg (00t;hn) tjo A LO F- W Branch circuits f solar and1a- striraqs) Uplofourz%pole Eaton SR series Distributed Generation (DO) breakers oni r [riot included; U 0 00 Z 0 > CC) (70 < VEX. COMSSUGttS Current rating (IilpuIT-Orn FV) "A LIJ 0 Max- total branch 6rcuft tweaker tang finout) SO A (any combination) _-) U) W Production Metering CT 200A solid cove pre -Matted and hvired Env0 m oy 0� MECHANICAL DATA 0- Dirnensians (WxHtD) 49,3 x 46 5 x 16-0 cm (!gA'x 18,3'x 6.3') Weight 715 5 Lq (16-5 ib sJ Arnb4m temperature range -4G" C to -+4-60 C (404 to 115 = F) Cooling Natural cGrwectian, plus her, shzEld Enclosure ervironmental rating Outdoor, NM-certi�ed, NEMA type 3R, iliclycarboriate constractian Wife SiZeS • 2GAact 5gAbreaker inputs. 14to4AVYG-_opperconduct ws 60 Abeakaf branch input: 3 to 1; ti AWS copper conductors Main lug combined output 1Dto2f0A1A'Gcapper ccwiductWs • Neutral and ground- 14 to 110 copper conductors Iways f t4lmk'7�cat code requirements for cond,actoT sizing. city AftitLtde 1q,00 M'Ekw- 6,56 0 fi_�-:tl INTERNET CONNECTIONOFTIOKS . ........... . .. Wheat RidgLm Integrated Vi -F8 Ethem*t 802.3, Cat5E ;serf --at 6) UTF Ethernet caale-roast included Cet'juon r Qp�6al, CELLMODE�WGI f3u-) or CELLMODEM-U3 (46) i(natiacludei:4 "/79 M'Asp COMPLIANCE Compliance,'Cornbiiner UL T7A1 CANtCSA C2_92 No- 107.1 47 CFR, Part 15, Class B. ICES WS PToduatoo metering: ANSI C12.20accuracy class &5 (PV production) Compliance, IQ Envoy, ;.IL 916 CAW CSA C29 2 No, 61010-1 * Consumption monrinring is required for Eriphase Storage Systems, To lea m more about Enphase offerings, visit enphasee.oarn SHEET NIA IM E 'NPHA SE DATA SHEET [PAGENUMBER REVISION M111111111=11 i CELL ��� l�I �� � I � m lel• � r I ouncied in 19197, Trina Solar is the worid s ieading to nprei a eve sdutipis p ov dao tar solar energy. we tJelsew : krse caopzraticrt weth aur partners is critical to su, cess. Trina Solar now distributes h s PV products to over 60 countries all over the world Tdria is able. to provide exceptional service to each custcWner in each market and %uppierwa our Innovative, rehahle products with the backing of Tina as atronvg, bankable Panner. we are C=o=ca Pd to blArding Sn atNit, mutually beneficial , oflaboration with installers• developers. dish ibvtorsano other partners. Comprehensive Products And System Certificates I -EC 61CiS13EW1730, tULil0,'ALC61701AI :b2716 I509001: Quality Marogem nt system ISO 1400L Environmental Management System 6014064! Greprilro rsegasm Erttissan VaiRtcation OKSAS.800) rxcupatiorille4ih and Safety Managnxgi1 System `e" LLT16 Maximize limited space with tap -end efficiency • Up to 192WIF-M power density Loma thermat coefficients for greater energy production at high operating temperatures Highly reliable due to stringent quality control Over 30 In-house tests W, TC HF, and rnany more) • In-house testing goes welt beyond certification requirements • PIS resistant 10Q°t`o El. doutrle inspection • Selective emitter, advanced surface texturing ,eok� Certified to nd the most challenging ��fui' environmentalSn OPawind load ns 5400 Pa snow, load . 35 (nm hail stories at 97 kamjh LINEAR PERFORMANCE WARRANTY 10 Year Product Warranty • 25 Year Linear Power Warranty d7rt:c•, 3 i � t„eta trhearvJx .• > €ndurd s,c.N-.:nrranty RAVENALLMAX'0PLU.'5' FRAMED 60 -CELL MODULE BLUE PRODUCTS POV'AARANGE ELECTRICAL DATA 111 1220 S. 630 E STE. 430 TSM-DD05A.08(li) I 280-315W AMERICAN FORK, UT 84003 TSM-DD05A.05(li) { 275-31OW Pear, Pow. rWat€s-P+.(Wri)' 2`"75 RICO 285 290 295 300 3 310 ? 415 Power output tolerance -p: w+€ (W) 0 • •5 800-377-4480 WVV"'. BLUERAVENSOLAR.CON1 Maxamornftwer Voltage V --(V) 31.A 'U,/ 31.8 iZ2 325.32,6 32:0 331 33:3 0M--N><NWOF VM,'ltttGRmrvmrtux; Maximum Power Cwent-ka (A) 8.76 B,84 8147 ?;01 408 9,19 9,28 937 9:48 CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE ` Open Circuit Voltage V SIV) ;18.4 36.4 MS 3B,g 39.6 199,8 40A 417.2 4€1.5 USED FOR THE BENEFIT OF Shoo Circuit 9,24 9.42 9,51 3:66 9,68 9.77 925 5.94 10.0 ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT Module Efiiciencyp• (9k) 16£8 171 17,4 131 180 18.3 18.6 18.9 192 BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE STC saietR vrmz•Ceu-ene a €e2 . ;At s a RECIPIENTS ORGANIZATION, 2 EXCEPT IN CONNEC TION WITH THE a SALE AND USE OF THE RESPECTIVE EQUIPr,1ENT, i-.A11THOUT THE ELECTAtCAL DATA(NOCT) x WRITTEN PERMISSION OF Maximum Power-P-M(WIP) 205 200 2772 216 220 223 227 231 235 BLUERAVENSOLAR LLC. i Maximum Power Voltage-vwlIV) 29.1 Z`9.4' 29.5 299 30.1 302 3C5 30,7 30:9 T_ 0 ave Mac€murnPower Cumari- (A) 7.04 7,1G 722 7,24 7.30 7,38 7.46 7.53 TED W W � - Q 00 Open Circuit voltage•vx(V) 35.7 35.7 35.8 36.2 462 37.0 37.2 37A 376 0 "It Sport Circuit Curren -ti: (A) 7.46 7,61 77:68 7,1770 7,82 789 7,95 803 WO Z (D M < (f) ) vua:es, PYJGT:#rs afwsat' kti;m`.-4 ni'ert'7s*atufe tik C. V[ Shed lnthi +'f V Z �j LL M 5to i -WO �- z Q O MECHANICAL DATA o (D00 a5ft.aA ':pA3 0 f J 1 Of aackv+�s, Solar Cells Manoerystatline 1S6.75x155.75mm(5inches) LJJ_-) Cly LW Ct€ Orientation b0 cells (6 -10) � o D 't vas Module Dimensions 3650.992 : 35 mm (65A - 39.1 x 1.38 inches) ly- m Weight 18,6 kg(41.0to) Cl.. Glass 32 mm (0.131nches), High Transmission, AR Coated Tempered Glass Backsheet White (OD05A.0B(Il)7; :c Black [DDOSA 05(0)] u t Frame Black Anodized Aluininium Alloy (ODOSA.08(Et), DDCiSA,O5(il)j (A -A) }-sax tP 67 r r IP 68 rated Cables Photovoltaic Technotagy Cabe 4.Omme (0,006 taches 377700 mm (39.4 inches) I-V CURVES OF PV Ml74DiE23QS4':: �A Connector Trina TS4 xa Fire Type Type I or Type Cityof -- TEMPEPATURE RATJNGS MAXIMUM RATINGS craw...._, _.........�,._. s 'd rat,? Twx.�-wrc,erau.q ea •c .wesre€ 44"Cit2°C) Operat,onalTernperature-40-a85'�C W eat Ridge �7 1 emcionsture GoafNcient of Po - 0.390lw4c Maximum System Voltage 1CIODV DC (IEQ lemperaturecoeffidentofv,-029%,fgf - 1C10i17Dc(UL) "79 D{`1kS10� N -Y CURVES .Cif VY ri02JULE{3051'; T€utrperatureCoetticlent of is 0,05%f1{, Mtrx15A(Pawer i285'+N) a s�sw+x �iA (Power �) m '�`+�r...KJ#tin rcavarrt Fusarn°,m�tineraaxrriz.€ �tx ream;sxs .an � Ga: a'�eicx�+� 4en'E7 WARRANTY PACKAGING CONFIGURATION M.✓' 10 year Product Workmanship Warranty Modules.per bunt:30pieces 25 year Linear Power Warranty Modus per 41Ytcmtainer, 840R eco €PleaSrf�te��P€Cd3xY.v€a�,ctty r�'rr�ttii& Ai 11 rtEADSAF1111INSTALLAT(01115711CTIONSHEF0RE4iS1111PR0D:sLT. Tri� �,DM7Tina so€a^iarteoAll rightsreserued,SpecificationsincrucedinthisdataShee.Btesubject totitangewit`ouYnotice. Vers orrrw €: TSM-_,N1_Zo1B„ A www.trinasolarrom SHEET NANIE DATA SHEET PACE MtA-lSER REVISiCN DS III AF UNIVERSAL CLAMPS Fit iFUNIRAC 25 OnPTIONAL MR TRIM Ian, W FRONT TRIM '*ARRARly k.4 ZE . . ............. BEST INSTALLATION EXPERIENCE* CURB APPEAL* COMPLETE SOLUTION* UNIRAC SUPPORT BETTER DESIGNS TRUST THE INDUSTRY'S BEST DESIGN TOOL stall In design process 104 every pinfect in out U Builder on line design tool, It's a great way 10 Save time and marloy. ONE SYSTEM - MANY APPLICATIONS fluickly set finiffiries, flush to the roof on Steep pitched foots. Ofierd a large variety of modules in Pollfait Of Landscape. IM the system UP on flat a, law slow foots Components available In rpiN, steal. n dark limshesto mitimix "of designinfancials and aesthetics, LTS PRIM REOU MAXIMIZE PROFITABILITY ON EVERY JOB fivst Urfanic to heir, you miamlize both system and latim costs tram the time the job is quoted tothetime vom teams get off the iffujai, hster installs, Less Waste. MrAe Piatits, BMER SURORT WORK WITH THE INDUSTRIES MOST EXPERIENCED TEAM F'Wessiomd Support [of piolessumal tostalleis and designers. You have access to om technical suppad and training gfinios. Whatever Year support needs, we've got van coveted. \hsit Unitac.rom/solaimnoid for more inframation MICHAWAt LWWG Mai UL2703 SBYuiar. Mwf1&Rf`[R10AdS�S@1A'wCAT4)N an In 81"UNIRAC CONCEALED UNIVERSAL ENOCIAMPS UNIVERSAL SELF STANDING MIOCLAMPS END CAPS INCLUDED WITH EVERY ENDCLAMP U -BUILDER ONLINE DESIGN TOOL SAVES TIME & MONEY Visit 6sigii,uuuactom UNIRAC CUSTOMER SERVICE MEANS THE HIGHEST LEVEL OF PRODUCT SUPPORT U N k1l AT C 14 NO CERiittfo F N G IN E I R li; IG BANKABLE 0 is I 1, 4 i O'ER IF N , QUAILTY EXCRIENCE WARRAWlY THIS 00CUMENIAPON, TECHNICAL SUPPORT CERTIFIED QUALITY PROVER BANKABLE WARRANTY thifieft's te"Call support team is dedlUnWd to answering tiffifac is the 004 Pv famomog Y"f wilth iso urfificabom; Dom lam "it PMO to dam, 0043c: has the boanciz, Questions & idrhessrng mires in tesil time An online tot 9WQ008, 14001.20M and 0IMS 1002007, sbeqgth to back out produds 2nd reduce Vein tisk RAW- WRIV of documents including enpineering 'ePrids, mans fee defivei the hohest staflidaUds to fit, peace of mind knowing M are Parviding pmjdurts of stamped letters and 1:90haid data sheets gnIatly form, and fund dft these cedfficmm d"Id'ale 011 metshomd quady. s1t,04WRT is Mind by a 2.5 Year sturiplifies your p-mritt.ing and pioiect planning pfum melleam and commitment In " ChA, IfORM mactm limited plod tet varfanty and a 5 mi limiled W voriamy. ENHANCE YOUR R&UTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAJIN IFUNIRACMasterPriceList SolarMoune SolarMounf MagterPriceLlst ""-UNIRAC Sizing Chart: Tilt angles for low profile adjustable leg kits Ndr- In few profile arrays, tilt angles depend on leg length and module lengft If ordering kits for use with SolaMount rail kits. no athef items are BLUE RAVEN required, lFordering far use with Pro-Pak rails, then L-feet must ado die orred-LARMOUNT Leg kit nuidel munber Leg kit model number Tilt Leg Sizing Chart & Price List Module make and modL4 3101n 32-CI22 319123 Module make and model 310121 310122 _310:123 1220 S. 630 E STE. 430 .............. ........... - ................ I ................................ I ................. ...................................... AMERICAN FORK, UT 84003 NE-ifiVit, KT47Vit L2-15' 25-3e ............... I ................. ............. ......................... ................... ........ .............................. ..................... ........................................... ........ ................... ................... ................... 800-377-4480 Sizing Chart: Tilt angles for high profile legs hlft7alli. -uslJi L!i-le 3-1-S& 4!i-&e AEFor 15-19� 31-4T 4!i-W WWW.BLUERAVENSOLAR.COM ................................................................. .................. ................... ................... In high profile arrays, tilt angles depends on leg and rail lengths. ........................... I .................................................................................... .................. UP sobr WD-zool]i, -2oolfff, -20111.11, zolklil` 13-19' 27-4e ;�. 39-W :­­' ................. ­.­ CONFIDENTIAL -THE INFORMATION ......................................... ­: ................... ................... ...... ........... ............ I .................. .......................... I ........... ................... ......_.I.. ........... Leg kit model number Leg kit model number Rail length fail length EP365 2&2e 34-5f 4g-W solwwww (shel) HEREIN CONTAINED SHALL NOT BE .................................... I ..................................... ...... I ............................ .................... I ........ ................... .......... .................. USED FOR THE BENEFIT OF .......... ................... ................... 14-18* 30-47 43-&f ANYONE EXCEPT Cinches) 310107 310108 310109 Cinches) 3=110 310111 310112 WOO, -485 15-2e 32-SI* 47-W W, 951`� SP75, SWO .......................................................................... ................... ......... ........ ............................... ................... .................... ........... ................... ......... ............ ......... ............. ..... ......... ............. ................. ....................................... ........................ ............... ................................ ........ ................... ............................. ........................ ............. .................... ................... .......... ------------------- BLUERAVENSOLAR NOR SHALL IT SQ165 BE DISCLOSED IN WHOLE OR IN 12-1 : 48 9--21* 30-W 120 RP3125 LI-le 2A-3f 34'-5V' W, -Pr- 75P, - PQ 5' ; 25-31T 3&60' S-129 IL6-47* ! .......................................................................... ................... ................... ................... ............... ........................ ............................ .......... ........... ............................ ............ ......... .................. ......... ................ ................... ........................ ............... ............................ .... ....... ------------------- ................... PART TO OTHERS OUTSIDE ------------ ....... ............ ...... '3�12* 20-3f 3a-5o .: S SW 230-SW245 =nG 60 7-17' 24-W 37-600 24-W 15-42' RP3IS0, -316ck, -4175 11-14' 22-35 32-5f ............... .......................................... ................ ................... ................... .................. RECIPIENTS ORGANIZATION. .................. ......... ......................... ... .... ....... EXCEPT IN CONNEC TION WITH THE 22-W 4-10' 11_3-38' "a --If --35� 32-5f .... SALE AND USE OF THE RESPECTIVE 72 6-Ir 19-W 31---We .................. ........................................................ ....... ................... ............... ..................... ....................................... .................... ................... ............................... ........ ... .................................... ................................... .... ........ ............................... ............................ .... ....... .......... .............................................................. ................... ................... ............ gww' -95 17-ze 50-W EQUIPMENT, WITHOUT THE 84 5-le 17-0 26-600 1 2R} i0° 4- 9F 12-3S° Eveililreen ............ ................... ................... ................... .................. ............ ........ ................................ ....... ....................................... ............................... ........ ... ............ ........................ ................................... .... ....................................... ............................ .... ...... . .......................................................... ............... ................... ........ ...................................................... ................... WRITTEN PERMISSION OF 2-4 1 SPR2ooSM -2-to -2i5WX -27o L7-22' 37-59' 53-W BLUERAVENSOLAR LLC. I" 18-W -9- 11-3r EC2,0Z. -110, -125 12-15' 2A-38' 35-59' 96 4-10* 14�4e 4 ................. I—- ................ I ................... I ................................. .......... ................. I .......... ........... ............................ ... ........ I .......... ............. ... .......................... ............. ....................................... ............... ................... ... .. ....................................... ....................................... ......................... ............. . .......... I ............................................................... ................... ...... ............. suntmt 106 4- T 13-36' 21-W ISO 17-SO vi,-30 ESi7oRL-i8oRL-13-Rt 1&20' 34-Sf 49-W ............ ....... ..................... ...................... ................. ....... ................ ................ ....................................... .............. ....... ............ ..... .......... ......................... .... ....................................... ......................... .............. .............. I ................. I ............................... ...... .............. ............... ............... ................................................... ................... ................... ................... GEEneqw WvEb-u5b, STPoSS5 17-21, 35-56 51-W C) 00 0 ......................................... ............................. ................... ------------------- ------- W W 4 ................... I .............................................. ................... ................... ................... STPxso-i2Th, STFnr Z -t GEFV072, -08� -i1Tc Sfftm 10-If 21-33r 30-49 15-W 31-AV ... 45-60 < ry Cb ......................... I ........................................ ..... ........ I .......... ................... ............. -) 0 Rails 120 to 180 inches long ...................... I ....... I ........................................... ................... ................ .............. Price List: High profile tilt legs (2 leg kit) GEFYVim -lio, 21-27' 45-6e 60* Z CY) < I .................... ............................................ ................... ................... ................... Each kit contains two square tubes, two strut inserts, and fasteners require leg kits with a fang STPiiG-24Afx 57i7s-z4Abi 9-le 19-3e A-4S' GEPVpi3o ............................... ................... ......... ............... I ....... I ....................... ............ I ......... 12 Z and a short leg for each rail, 4 13-16- 26-41- for use with SolarMount rail kits (pp. 13-14). .......................................................................... ................... ................... ................... 73 Lf) F- W 0 00 W legs per kit. 21-2f 45-6cf ............. I ................. .. ................................ ....................................... ................... > 0 !.­GEFVI.73CY) 0 < 00 ............ ... LZ-3,�' 2li-4d' 3&6o' maldinum leg Nom- shipping data SW85� -W� -% 0 0 ................................................ ........ ........... .............. GENpig5t, -zwt 12-19, 2&427 311-W ................... ................... part no. extension Cnch-) inches lbs Dist price W .............. .......... I ........ .......... ....................... .......... ....... WIM -Im -1,1S, -1�0 25-4e 3&fid' .............................................. ................. ................... ................... .................... Cl) Lli 310107 12 lDx2x4 3 S54.00 SWI5.r ...................... ........... ............... ................... 11 7d° 23-36 33 ,4° 0 ............................. ....... ­._.. -,-165 ............................... ­-.1.1­1 .............................. :..._ ............. .................. ................... 310108 44 26X2x4 7 82.00 17-21 3"G' _J ....................... I ............................................ ................... ................... ............. 1111661W 310109 72 40 x 2 x 4 10 108,00 co ............................................. ......................... ........ ­_r ............ I—, ........... .17-22* 36-515' SA-W ....... EL .......................................................................... ................... ................... ................... E56zTt 31-4!f ! 44-61? 17-2e 36 5G° .............................. ................................... ................... ........... ................... -------------------------------------- ......................... .............. .............................. us64 : 17-21 35-Sg.' SI-W . '......... ........................................ .............................. .................................................................­...... ................... ................... ................... .......................... ........ zTe ti 5. ............. ............. ................... ............. ........... .............................. ............ For Mills 48 to 106 inches long, fi-EAaCzt, G-SADFat 19-24' 4G-W -rA-W ......................................................................................................... ................... ! YUG, -95t IE-Ze 33-Se 49-W use leg kits with a single leg ................................................................... .......................... ................... ................... ............................................................ I ............. ........... ................... ............ Pe rail, 2 legs per kit. i Wount with bottom mounting dips orgy. KOD, SD-oa, 857r, 85TS V : 12 - 21' 33 - W WA ........... I .............................................................. ................... ................... .............. tin low profile tilt-up applic3tions, mount with top mounting darrips only. High profile tilt 4 1011, r&G, 1676,17GGT_L75GT, ID - .10 z6 - 49 38-7e Sizing Chart: Quantity of legs (2. leg kit)KD'1soGW .............................................................................................. ................... ................... low profile tilt legs required Y KC120-312 , 125, 5G2251 13067, 3 - 15' 223 - 42' 3A The inumber of tilt led Tegp4edin a low proffie array depends on the i3d7K A76� 2L9oGF 2aoGT Price List: High profile tilt legs (4 leg kit) length of the mixuating rails. ................................................... ....... .............. .................. ................... ................... lTa30SX-MP,I355X-W, KD'30GX- 7 - le 22 - 4e 33-W ftd ImVffi per row. Tilt Kegs cequired peT row citj, Atom. shipping data Maximum leg .. y_ LP, -LF, KD2o_rGX-LF, z&oGXLP 235GX ............. ............................................................ ...... ............ .......... ............ I ....... Part no. extension (inches ) inches lbs List price to 106, 4r ................................................................... .................................................................. ........... "­'_­_*­_­ .............. ... * .......... ........ ­ ........ ....... 310110 104 56x4x4 20 S227-00 izd' to i8o' AMFiioEC3t, -i2oli[31 13-17' .27-43' 35-60' ': 3 : ................................................................... ................................ ................................. 310111 is 13x4x4 7 1GI-00 ........................... .............................................. ................... ................... ................... cf 19Y'tO 216' 4 ve 31,0112 64 36x4x4 16 169,00 PVMFi25EA_A1. -I3oEA21F 3-5-1? P�50* 45-W ; ................................................................... .................................................................. High profile tilt ............................................................................................................... ................ : 05�_' z2g, in 2W 1 5 L2-ir A--4d' 37-W "10 FMFI65ES3 ...................... ............................................ .............. .............................................. legs (4 leg kill .......................................................................... ........ .......... ................... ................... ..... ' ...... 30ti' to 336" .................... ................ ................. ................... ................... ............... .......... .................................................................. IA-If 23-47' 41-W ................................................................... .................. *-.*,*-.* ............ ................ 307 10 40r 7 ................................ .................................................... I .............................................. 420' 10 432' 9 Sanyo................................................................... ....._..I........ .......................................................................... ................... ................... ....... -.1 ........ lflF-i9c8A3t, -i95HA3t -2oRA3t 14-13' 3P-47' 42-W Price List: Low profile tilt legs (i leg per kit) MFIH[T x3aDA3 Each low profile tilt leg kit contains one square tube and one ............ I ................. . .......................... ................... ................... ................ Schott saw strut insert, two L-feet and stainless steel hardware for use with .......................................................... ............. ......... .............. ................... Seliiffiount: rail kit A5E3..-......-. I 3..1..,.5 ...-33o 15-29314'..JA..-Ge ..........I....................I................9... ........... ... Nam shipping ditta MA)CIMUM leg Sharr .......... I ....................................................... ................... ....................................... ftrt no- extension (inche4 in lbs Listprice NE-SbUEA 14-19, 31-48' 44-W ................................ ......................................... ................... ................... :­­­ ........... 538.00 SHEET NAIVIE 31OL21 12 10x 3 x 3 2 ND-L3EJEAJi23wJ,-L5E1UfI2Sw) 2E-44- 40-fie 19x3x3 3 47-DO ................ ................... ................... ................ 31,0122 30 DATA SHEET ND-NAW _17-21! 36-56' 5,I-W 310123 44 26x3x3 4 55-00 .................................................................... ... ................... ................ PAGE NUMBER REVISION ND-i&WI, -ifi2llIE -A7L[i 17-217 36-56' P-W -167UIF DS 0 ........................................................................................................................ and speciyivatiom are subfiErefto charW withoutmatice. 19 1 City of Wheat Ridge Residential Roofing PERM - 201705964 PERMIT NO: 201705964 ISSUED: 08/11/2017 JOB ADDRESS: 3920 Newland ST EXPIRES: 08/11/2018 JOB DESCRIPTION: Residential Re -roof to install asphalt shingles - 36.66 sq (27.66 sq pitched / 9 sq flat) *** CONTACTS *** OWNER (720)495-5447 PRZYBYLO ROBERT A SUB (720)504-5023 Travis Williams 170353 Green Gable Roofing & Exterior *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 14,000.00 FEES Total Valuation 0.00 Use Tax 294.00 Permit Fee 267.70 ** TOTAL ** 561.70 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. 3Qti� A�e�Qn��� INSPECT! ffRECORD INSPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/inspection INSPECTION REQUEST LINE: (303) 234-5933 Cancellations must be submitted via the online form before 8 a.m. the day of the inspection Occupancy/Type Inspections will not be performed unless this card is posted on the project site. **Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Comments Initials Pier Concrete Encased Ground (CEG) Foundation / P.E. Letter Do Not Pour Concrete Prior To Approval Of The Above Inspections Underground/Slab Inspections Date Inspector Initials Comments Electrical #I(Sheathing Sewer Service Mid -Roof Plumbing Do Not Cover Under round or Below/In-Slab Work Prior To Approval Of The Above Inspections Rough Inspections Date Inspector Ini ' Is Comments _ #I(Sheathing Mid -Roof Lath / Wall Tie Rough Electric Rough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw / Nail Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing Final Mechanical Roof Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. *For low voltage permits — Please be sure that rough inspections are completed from the Fire District and electrical low voltage by the Building Division. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather City of Wheat Ridge Residential Roofing PERMIT - 201705964 PERMIT NO: 201705964 ISSUED: 08/11/2017 JOB ADDRESS: 3920 Newland ST EXPIRES: 08/11/2018 JOB DESCRIPTION: REVISION; ADDING DECKING TO EXISTING PERMIT *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. Residential Re -roof to install asphalt shingles - 36.66 sq (27.66 sq pitched / 9 sq flat) *** CONTACTS *** OWNER (720)495-5447 PRZYBYLO ROBERT A SUB (720)504-5023 Travis Williams IT6'&3 Green Gable Roofing & Exterior �w *** PARCEL INFO *** ZONE CODE: UA / Unassigned US UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOC LST#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 16,000.00 FEES Total Valuation 0.00 Use Tax 336.00 Permit Fee 299.40 ** TOTAL ** 635.40 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. City of Wheat Ridge ,0054,00""" Residential Roofing PERMIT - 201705964 PERMIT NO: 201705964 ISSUED: 08/11/2017 JOB ADDRESS: 3920 Newland ST EXPIRES: 08/11/2018 JOB DESCRIPTION: REVISION; ADDING DECKING TO EXISTING PERMIT Residential Re -roof to install asphalt shingles - 36.66 sq (27.66 sq pitched / 9 sq flat) 1, by my sinature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applica le building codes, and all applicable mwlicipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the workto be performed aid -that allsrlC'%fig performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature o OWNER or CONTRACTOR (Circle one) Date I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4_ No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all re uired inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction,�val of work is subject to field inspection. 1 L.:._� {r _r: Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City of "jge COMMUNITY DEVELOPMENT Building & Inspection Services Division 7500 W. 291h Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 FOR OFFICE USE ONLY Date: 6 2-- Add to Permit # Z�o 1-1 C;5 � Email: perm its(@ci.wheatridge.co.us Building Permi Revision/ endment Application *** Please complete all highlighted areas on oTliV(d, S"" of this form. Incomplete applications may not be processed. **' Property Address: Owner Property Owner Email: Mailing Address: (if different than property address) Address: City, State, Zip: Phone: `) 20 - `3l0"7 -2 3� 7 Contact Person: Phone: -7L0-�Cjr_ .J'V4 -7 Contractor: (S"C" Cwt?, -(y Contractors City License #: Contractor E-mail Address: Phone: Please Note: Additional valuation must include all general and subcontracted work to be performed related to the revisions and/or amendments declared in the description of work and which were not included in the original permit valuation. If revisions or amendments increase the original valuation, additional fees will be due at the time of approval. Depending on the scope of work, additional plan review fees may be due upon approval ($60.00 an hour — 2 hour minimum). Description of revised/amended work: IZP- J" r -OX Sq. FULF Amps Btu's Squares Gallons Other Additional Project Value: (Must include all general and subcontracted work to be performed related to revisions/amendments described above) OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. CIRCLE ONE: (OWNER (CONTRACTT�or (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR) PRINT NAME: SIGNATURE: SIGNATURE: Q DATE: ZONING COMMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer: PUBLIC WORKS COMMENTS: Reviewer: PROOF OF SUBMISSION FORMS Fire Department ❑ Received Water District ❑ Received Sanitation District ❑ Received DEPARTMENT USE ONLY OCCUPANCY CLASSIFICATION: ❑ Not Required ❑ Not Required ❑ Not Required Building Division Valuation: $ i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type✓— Job Address:\ 3Z Z Permit Number: O/2 G 3 `// 0 k� :'X LtITr� ❑ No one available for iVYes n: Time 26 AM/PM Re -Inspection required: No When corrections have been made, call for re -inspection at 303 -234 - Date:/ Inspector: 6t.1 / DO NOT REMOVE THIS NOTICE le CITY OF WHEAT RIDGE �Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: % J 0 Job Address: _ 17j4� Permit Number: 17 05'? G 41 ❑ No one available for inspection: Time AM/PM Re -Inspection required:es No When corrections have been made, call for re -inspection at 303303-2 Date: /Z Ins ector: p J/f 7 00 NOT REMOVE THIS NOTICE ? A a City of Wheat Ridge Residential Roofing PERMIT - 201705964 PERMIT NO: 201705964 ISSUED: 08/11/2017 JOB ADDRESS: 3920 Newland ST EXPIRES: 08/11/2018 JOB DESCRIPTION: Residential Re -roof to install asphalt shingles - 36.66 sq (27.66 sq pitched / 9 sq flat) *** CONTACTS *** OWNER (720)495-5447 PRZYBYLO ROBERT A SUB (720)504-5023 Travis Williams 170353 Green Gable Roofing & Exterior *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 14,000.00 FEES Total Valuation 0.00 Use Tax 294.00 Permit Fee 267.70 ** TOTAL ** 561.70 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. City of Wheat Ridge Residential Roofing PERMIT - 201705964 PERMIT N0: 201705964 ISSUED: 08/11/2017 JOB ADDRESS: 3920 Newland ST EXPIRES: 08/11/2018 JOB DESCRIPTION: Residential Re—roof to install asphalt shingles — 36.66 sq (27.66 sq pitched / 9 sq flat) I, by my signature, do hereby attest that the work to be performed shall comply with all accompanyingg approved plans and specifications= applicable building codes, and all applicable municipal codes, policies and procedures, and that I am fhe legal owner s have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attes{ that I am legally authorized to include ali entities named within this document as partes to the work to be performed ar hhat all wo be performed is disclosed in this document and/or its' accompanying approved plans and specifications. rid -2_0(-1 Signature of OWNER or CbNTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in thepermit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5, The permit border shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Dan Schultz q01 �05 `6 From: no-reply@ci.wheatridge.co.us Sent: Monday, August 7, 2017 3:17 PM To: CommDev Permits Subject: Online Form Submittal: Residential Roofing Permit Application ) Categories: Danny s Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come C 4 to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. Li For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email Address 3920 Newland Stbil Robert Przybylo 720 495 5447 Field not completed. Do you have a signed Yes contract to reroof this property? It will need to be provided at the time of permit pick-up. Attached Copy of Field not completed Contract CONTRACTOR INFORMATION Contractor Business Green Gable Roofing & Exteriors Name Contractor's License 170353 Number (for the City of bL_ Wheat Ridge) Contractor Phone 720 504 5023 Number Contractor Email Address dave@greengableroofing.com Retype Contractor Email dave@greengableroofing.com Address DESCRIPTION OF WORK Are you re -decking the No / roof? Description of Roofing laminated shingles and rolled modifield bitumn Material Select Type of Material: Asphalt, Rolled If "Other" is selected Field not completed. above, describe here: How many squares of the 27.66 material selected above? Does any portion of the Yes property include a flat roof? If yes, how many squares g on the flat roof? TOTAL SQUARES, (pitched + flat) of all��� roofing material for this project Provide additional detail here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract value or cost of ALL materials and labor) re -roof house & carport, remove and replace shingles , roof pitch perdominant is 9/12 and 5/12 along with a flat roof C14,OOO SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant David Barnard Email not displaying correctly? View it in your browser. 3 -g Advocate Construction Office: 303-795-0527 40 W. Littleton Blvd., Ste 210-264 Fax: 303-632-2462 Littleton, CO 80124 Homeowner�b� �Z t :2 7 7� Nome Phone C [on.� �q•?GI Dated'^� ` Address Jsl`: j L lit r r Cfty ^� Statre� Zip CodeC� '_^ i 1 e o. V� F E r S E Mail Storm Date P�-a Claimtti L� 7 kz3�- Aer Appointment Date and Time: immediately! iphu4 -721=3'�i`5 This agreement is void if the roof is not apprr replacement a insurance company. av Homeowner authorizes Advocate to represent them during the adjustment and supplementation process ' ' . ; Homeowner requests that the insurance company provide Advocate copies of all claim correspondence Advocate agrees to perform all work per the insurance specifications at the agreed insurance company pricing- Approximate Date of service: �-- 14::� _ 0 Approximate cost of service: Notes: J�D Shingle Manufacturer: Style: Color: Drip Edge: Black Gray Mod. Bit Color: White Brown Tan Hip/ Ridge Style: Standard High Profile Ice and Water Shield Upgrade if not covered by Insurance: Add. Cost. Initials: Notice: Advocate Construction is not responsible for water damage in the areas typically covered by ice and Water Shield, (Eaves, Valleys. Fireplaces and Penetrations), if the H.O. elects to not install. Initials: Additional Details: Roofing Contractors are prohibited by law from paying, waiving, rebating, or promising to pay, waive, or rebate all or part of any Insurance deductible applicable to an insurance claim made to the property owner's property and casualty insured for payment for roofing work on the residential property covered by a property and casualty insurance policy, per C.R.S. 6-22-101c. RIGHT TO CANCEL: If the Homeowner does not want materials and/ or services, the Homeowner may cancel the contract and obtain a full refund of any deposit within 72 hours after entering the agreement. CANCELLATION POLICY: Advocate shall invest sub antiai ti and resources i paring to perform the scope of work described in this agreement and shall suffer losses if the property owner cancels the ork after t e ins nce mpan as approve th scope of work. erefore, the following cancellation policy shall apply: Charge following initial inspectio . $200.00 o e ng the adjust : $ 0.00. plementation complete: $150.00 per additions our. V \1 Client Signature: \``............................................Date: �?:...:........,/..!.....C; Advocate Rep's Signature: ,a�....:G!L4�`............................................................ Date: ............................ A i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: M �� Job Address: Id, Permit Number: ? V'70 ( ❑ No one available for inspectio. Time AMf Re -Inspection required: Yes N When corrections have been made, call for re -inspection at 303-234-5933 Date: ��� Inspector: DO NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: (? of Job Address: -3 ? 2 u 111rw l i n Permit Number: e 0 7 C ❑ No one available for inspection: Time A413M Re -Inspection required: Yes 4o) When corrections have been made, call for re -inspection at 303-234-5933 2 �! Inspector: Date: � l DO NOT REMOVE THIS NOTICE CERTIFICATE OF COMPLETION City of Wheat Ridge 7500 W 29th Ave Wheat Ridge CO 80033 Permit# 081069 Issued: 11/20/08 Stipulations: Expand Existing Bathroom Dormer This certificate verifies that the building constructed and/ or the use proposed of the building and/or premises, under the above permit number and on property described below, does comply with the Wheat Ridge Building Code and development standards of the zone district in which it is located and may be occupied. All other licensing requirements for the City must be met. Site Address: 3920 NEWLAND ST Parcel Number: 39-243-13-006 Owner: Robert Przblylo 3920 Newland St Wheat Ridge CO 80033 Contractor: For the Following Pu Co e Editions _ 2003 ICC/2005 NEC _ 2003 ICC/2002 NEC 1997 UBC/2002 NEC Sprinkler System rpose: Residential Addition NO change shall be made in the USE of this building without prior notice and a new Certificate of Completion from the City of Wheat Ridge. Inspector Zoning Administrator FICATE MUST BE POSTED BY FRONT DOOR OF COMMERCIAL OCCUPANCIES 06/24/09 09:55:54 City of Wheat Ridge Page 1 bp701-1s PERMIT INFORMATION - 081069 mmackey PERMIT INFORMATION: Permit#: 081069 Permit Type: Residential Addition Permit Dt: 09/15/2008 Expires: 03/14/2009 LAND PARCEL INFORMATION: Zone Cd: Unassigned Funct Use: Unassigned Subdivision: CASTLE Cont Type: Miscellaneous Legal: Address: 3920 NEWLAND ST Parcel Cd: 39-243-13-006 OWNER: Robert Przblylo Address: 3920 Newland St City/St/Zip: Wheat Ridge CO 80033 DO: 1 Last Zone Dt: Annex Dt: Lot: Block No: 0 SetBacks-Front: 0.0 Left: 0.0 Right: 0.0 Back: 0.0 JOB DESCRIPTION: Expand existing bathroom dormer FEES QTY DUE PAID: Permit Fee 39,720.00 705.65 705.65 Plan Review Fee .00 458.67 458.67 Total Valuation 39,720.00 .00 .00 Use Tax 39,720.00 714.96 714.96 1,879.28 1,879.28 CONTACTS: owner Robert Przblylo 3920 Newland St Wheat Ridge CO 80033 sub CLA Ideal Electric Inc 3777 Quentin St. Denver, CO 80239 3033074949 sub CL8 D.C. Plumbing Co. Dennis R. Carter 2112 S. Washington Street Denver, CO 80210 3037780536 sub CL9 Precision Mechanical LLC Tom Bowen 2766 E Peakview Cir Centennial, CO 80121 3033472900 PARCEL INFORMATION: 10 Structure Type 1.55 20 Year Built 1950 30 Property Type RESID PERMIT CONDITIONS: Must comply w/ 2003 IRC & 2005 NEC. Approved with red line notes on plans APPROVALS: REQUIRED INSPECTIONS STATUS: PERMIT NOTES: 09/15/08 CREATED FROM APPL# 08-0336 09/15/08 KC - Approved with red line notes on plans. 09/04/08 Given to JS for review # TYPE CONTR# CALLED CNCL WHO REQ DT INS DT STATUS 1 SHE: Sheathing/Sheer Insp 10/01/08 no CCI 10/02/08 10/02/08 INCOMPLETE 2 SHE: Sheathing/Sheer Insp 10/02/08 no CCI 10/03/08 10/03/08 COMPLETE 3 PRI: Plumbing Rough Insp. 01-8206 10/02/08 no CCI 10/03/08 10/03/08 INCOMPLETE 4 ERI: Electrical Rough Ins 02-1693 10106108 no MV 10/07/08 10/07/08 COMPLETE 5 FRI: Framing Rough Insp. 10106108 no KC 10/07/08 10/07/08 INCOMPLETE 6 fri: Framing Rough Insp. 10/07/08 no kc 10/07/08 10/07/08 COMPLETE 06/24/09 09:55:54 City of Wheat Ridge Page 2 bp70l-1s PERMIT INFORMATION - 081069 mmack.y 7 pri :Plumbing Rough insp. 10/07/08 no kc 10/07/08 10/07/08 COMPLETE 8 mri :Mechanical Rough Ins 10/07/08 no kc 10/07/08 10/07/08 INCOMPLETE 9 INS :Insulation 10/09/08 no CCI 10/10/08 10/10/08 COMPLETE 10 MID :Midroof Insp. 10/17/08 no KC 10/20/08 10/20/08 COMPLETE 11 DWS :Drywall screw/nail 10/20/08 no KC 10/21/08 10/21/08 COMPLETE 12 dws :Drywall screw/nail 10/20/08 no kc 10/20/08 10/20/08 INCOMPLETE 13 efi: Electrical Final Ins 11/19/08 no Kc 11/20/08 11/20/08 COMPLETE 14 pfi: Plumbing Final Insp 11/19/08 no kc 11/20/08 11/20/08 COMPLETE 15 mfi: Mechanical Final 11/19/08 no kc 11/20/08 11/20/08 COMPLETE 16 ROF: ROOf Inspection 11/19/08 no KC 11/20/08 11/20/08 COMPLETE 17 bfi: EUilding Final Insp 11/20/08 no kc 11/20/08 11/20/08 COMPLETE INSPECTION RECORD Occupancy/TVpe INSPECTION LINE: (303) 234-5933 Inspections will not be made unless this card is posted on the building site Call by 3:00 PM to receive inspection the following business day. INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB FOUNDATION INSPECTIONS DATE INSPECTOR INITIALS COMMENTS: Footings/Caissons Stemwall / (CEG) Concrete Encased Ground Reinforcing or Monolithic Weatherproof / French Drain Sewer Service Lines Water Service Lines CONCRETE SLAB FLOOR Electrical (Underground) Plumbing (Underground) ROUGHS Sheathing Lath / Wall tie Mid-Roof d7o pg JAG Electrical Service Rough Electric Rough Plumbing rp. --b Gas Piping Rough Mechanical AROVF INSPFCTIONS TO-RF SIGNED PRIOR TO PROOFFRINr: Framing /e r DT J Insulation ooe ~ P/3 Drywall Screw 1031 d$ FINALS Electrical /A-9eq ,ee Plumbing J o t. Mechanical J o e Roof f oP ;ee Building Final OZ~ Fire Department - R.O.W & Drainage ING ONE WEEK PRIOR TO FINAL INSPECTIONS S R U Parking & Landscaping - . TART ALL O T "NOTE: ALL ITEMS MUST BE COMPLETED AND APPROVED BY PLANNING AND ZONING, BUILDING AND PUBLIC WORKS BEFORE A CERTIFICATE OF OCCUPANCY IS ISSUED. FINAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTE AUTHORIZATION OF A CERTIFICATE OF OCCUPANCY NOR PERMISSION FOR OCCUPANCY. OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF OCCUPANCY IS ISSUED PROTECT THIS CARD FROM THE WEATHER 1* 41 CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office - (303) 235-2857 Fax INSPECTION NOTICE Inspection Type: Al~rW 6~Gi Job Address/Permit Number: 3~rr /fp~l~rr~ sT• fi'%DG~ ,,v,wayg£ ' ❑ No one available for inspection: Time 9`,'3'o AM/PM Re-Inspection required: Yes ) N When corrections have been made, call for re-inspection at 303-234-5933 Inspector: ~c Date: //&a r DO NOT REMOVE THIS NOTICE ♦~~41 CITY OF WHEAT RIDGE Division f Building Inspection (303) 234-5933 Inspection line (303) 235-2855 Office ' (303) 235-2857 Fax INSPECTION NOTICE Inspection Type: Alxe. A/_ Y,6: evywlglx, Job Address/Permit Number: 1?3na Ew/~s, r~ sr• ~~e©~Z ~f'l~l~o,✓~o ❑ No one available for inspection: Time B/ AM/PM Re-Inspection required: Yes eiTo_~) When corrections have been made, call for re-inspection at 303-234-5933 4' CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office - (303) 235-2857 Fax INSPECTION NOTICE Inspection Type: )7,+r425- Job Address/Permit Number: ❑ No one available for inspection: Time AM/PM Re-Inspection required: Ye No When corrections have been made, call for re-inspection at 303-234-5933 Date: ti Inspector DO NOT REMOVE THIS NOTICE Date: /e T dp Inspector: 2~ e DO NOT REMOVE THIS NOTICE Je CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line J (303) 235-2855 Office ' (303) 235-2857 Fax INSPECTION NOTICE Inspection Type Job Address/Permit Number: ~~a O rrnnn5 ~l r ❑ No one available for inspection: Time l( A PM Re-Inspection required: Yes No When corrections have been made, call r re-i spection at 03t 34 33 1 Date: IFi Inspector: ?P DO NOT REMOVE THIS NOTICE CITY OF WHEAT RIDGE ~r~ Building Inspection Division / (303) 234-5933 Inspection line (303) 235-2855 Office ' (303) 235-2857 Fax INSPECTION NOTICE C - ~r~vGi Inspection Type: Vr, c Job Address/Permit Number: 39ZO n P l ❑ No one available for inspection: Time AM/PM Re-Inspection required: Yea__:~)No 1- When corrections have been made, call for re-inspection at 303-234-5933 ii S Date: ' z v$ Inspector: 1- DO NOT REMOVE THIS NOTICE CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office ' (303) 235-2857 Fax INSPECTION NOTICE Inspection Type: Job Address/Permit Number: ~facY~f u~f_ ~2(r7Js4it ~~ZY7C~ ❑ No one available for inspection. e AM/PM Re-Inspection required: Yes o When corrections have been mad c 1 for re -inspection at 303-234-5933 Date: Inspector. DO NOT REMOVE H NOTICE ♦,I4' ~ CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office - (303) 235-2857 Fax INSPECTION NOTICE 09106~~ Inspection Type: I: Job Address/Permit Number: 39gc_/ ~fl.., ♦ F 1= I.` k ❑ No one available for inspection: Time AM/PM € Re-Inspection required: Yes F E.. When corrections have been made, call for re-inspection at 303-234-5933 k Date✓ Inspector: DO NOT REMOVE THIS NOTICE ..yti . , c- .:6..^l. . : a„ . 3 . t . „ CbfV'hE~tt ltidge Addition FERMIT - Q81069 . . .y @l . . . , . . . . . PERMIT Np::.Q910~9~.... ISSUED:0~9/15/200:8... JflB.APDRS5S::3920 NPWf,AND5T . . . . . EXPIRES: 03/14/2009 . . DESCfiI81'ION;i Ei~aucr ~eatiati9n • batkszaom dorme~ **a COYJ'I'ACTg •w> owner Robert Przblylo sub ; 393/307-4949 02-1693 Ideal Electiric Ihc ' sub303/778-0536 DennisR. Carter 01-8206 D.C. Plumbinq Co. sub 303/347-2900 Tocn 8owen 01-8636 Precision Mechanieal LLC ° PARCEL SNFp ' ZONL: COTSL : > t3A . USE: ~ UA . 3USUIYISIOET:. 0403 . . . . . . HLOCKLLOT#: 0/ . . P'$E S;;Q}ARY *4 ` 8ST.TMATEb PROJECT VALUATIQN: 39,726.0.0'. . . . . . FEES . . , : . . Permit Pee:. 765.65 . . . Plan ReviewFCe 459:69 ~:l . . Tot81 Va.luatiPn . : .00 ' Use . Taac.. . . 714.96 , . . . .*..TOTAL . . 1,874.28. Coriditxnnsr Must.GOqtply;wJ 2003.-IRC &2005NEC. Approved with red line notes an'plans I hersby cerf.1E` C1tAE the retback Cietancee propoeedby tri:e parmit application are accu;ate, and ao•not violate applicabYe nrdicartces a t+C.rq$ul~t~one of Lhe Cntyof Wrieat.Ridge or covenanta, eaeementa ox restrictione.of resord; thae all - measut2 ta e9mr WRT-e iona ina. ce accurate;that I navc read and agcee to abide by ail conditione printed on Chig apQ1S, 4ion I 99*ame, vll r t s3Di21ty Eor c6mpliance with the {4rieat Ridge Huilding COde'(I.B.C) @nd'ail other. ..appl' ab34_ F)Grk undez this permi .Pla e auDject to fleld:inepection, . ..si e f crontcv~ce4i%a.m, ¢ - . d eW . . 1. TtYi[tjR*x'm#.t wae i9914edrdance withtne provieia»a..see fortH in yourappiicatiori and ie auti3ec[ to tde lawa ofthe Statd oi ColoYAdo an3to the Zon3ng Regulatims and~HUildi}g Codee of 4fhest Riflge, Nlorado or any other appluable ord}.nartCee of the City; - ~ . ' ...2. RYlSs ge;arSE,.913d11 eYpire 180'dayefrom Ghe iseue daCa. 8equeste.for en exteneion muet.be recelveflpsiot tbexpiYation.8ate. An ezietleian may Le ¢XS3ited at thc.dlecre[iou of [he 6uilding OEEicial. `.3. If tltie gezmit cxpiraar d n$w permit may tie acqulredfoi a.fee ofono-half the amount.normally required, p,rovnded nq ~.phpngea ttave 6een or will b4 ma¢e.in the original plane-Lnd apecificatiaue and any.9uepeneion.ar absndonrqenC~haa noe ~¢xceeded onp~fS7 yean;. IE changes Aa~ebeen or if auepenaion or abandonment exCeeda one (1) Xear,. full feea shall bC, pdif1 ;4L 8 dMM Ie%mik. . ' . . q No wcrk of apy, msvner 9hal.i be Qon! that will eTange the natural flow of water c8uaing a dYainaga problem. 5. ..CdntYaCtdY..eFta111 nbtifpehe'6uilding Taspeetor [wenty-lour (24). houzain advance for a11 ¢nepections and 93iali recelYe..~ixtbo dppr9v4£ bn }napoet.i6a,c0rd Cefore proceeding wieh succeseiye phasee o€ the jotr. - ? . . ..6. ThG xseuance ak ¢ pezm.l,t or Cne approval ofdrawin9e and epecificatione ehall no6 be conetrued~to be a pexmi[ for, ndz aiY BppYOwalaf, Oty roiglakiob,o£-tde,provieionsoE the bullding codes or any other otdinanCl,. law, rule tlY zeguiation. A11 plan cevlew YB • je ofieldinapectione. . . signxkWre nL tli1aS' OYCrclAl". daee . ZyTgPAMIQN,S'F`-LIN$a (303)234-6933 BUILDING OFFICE: (303)235 2855 " . REQt€~"1'S NRJ9 ~ $~fi~3PM~ANY BU$INESS DAY FOk SNSPBCTION THE:FOLLI.~ISVSNG BIISI~SS DRY. 'D~AA , oF'""~TR, City of Wheat Ridge Building Division ~ m 7500 W. 29th Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-235-2857 a Inspection Line: 303-234-5933 ~CORP~ Building Permit Application PropertyAddress: 0 e °`Aj 1-4X-Y10 Date: ~ ~l C',+C,'9 "N Plan Permit Property Owner (p/ease print):_~z~ ~Z17j j L~7 Phone: Mailing Address: (if different than property address) Address: City State zip: Contractor: eg Lo ),s g,'~ Contractor License Phone: Sub Contractors: Qa, 03 dtga,~,/ 1e63b Electrical City License Plumbing City License Mechanical City License # CompanY:07"cf1'+-~~~~G Company-DG,?W"^81,3E) Company:-j1;iEGS1t~ Exp. Date: a(axpl Exp. Date: Exp. Date: Approval: Approval: Approval: Use of space (description): `~j~~ ~ IS"r> t~~l Construction Value: ~7:7`~ D@SCfiptlOn Of WO~k: !as calcula[ed per the BuildB g a on ata sheet) ~ Plan Review (due at time ofsubmittal): E ~Z ~ Sq. Ft./L.Ft added: ~ Squares BTU's Gallons Amps OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certiy that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurete; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with the Wheat Ridge Building Code (I.B.C) other a lible Wheat Ridge Ordinances, for work under this pertnit. subject to field inspection. of N ONTRATOR) ~ CIRLCEON .(OWNER) (CONTRACTOR) or PERSONALREP 3EAI' PRINT NAME: 1 ~ ~IGNATURE: Date: 74~ ZONING COMMENTS: Zoning: Reviewer: PUBLIC WORKS COMMENTS: Reviewer: DEPARTMENT USE ONLY BUILDINGDEPARTMENTCO ENT$' O,,/ /"/,Aft3tUPANCY: Reviewer y^ yn L.✓ i FIRE DEPARiMEN ❑ approved w/ comments ❑ disapproved Yno review required Bldg Valuation: Jackson Engineers, Inc. -A 8761 E. Hampden Ave. • Suite B-3 Denver, Colorado 80231 (303) 337-8888 • Fax (303) 337-8842 August 29, 2008 Email: jacksoneng@qwest.net Mr. Robert Przblylo 3920 Newland Street Wheatridge, CO 80033 Re: Foundation Observation (for new framing construction) Dear Mr. Przblylo: This is to verify that we have examined the existing foundation and basement beams at yout properly, noted above. It is our opinion that the struchue can adequately support the proposed reframing of the second floor bathroom at the reaz gable roo£ We also sized the new roof beams for the extension of the gable dormer, as shown on the plans prepazed by your designer. Jackson Engineers By: CW ~ . t . . . . . p . ~ . EiectriC' PERMIT - 0K"~ ; . PERMTT NC1: 06I64i`" ~ iSSUED: 09for9/2000 JOB'ADDRESS'.19Z,Q N&LAND $T . BBPIRES: . 03/08/2009 ' . . DSSCE2IP`t'£O27t 200 3" $4n01 :upSZ?~; ~ r w COiqTAC't`S owner Rab'Prizglylo . gc 303/307-4948. Michael Walea 02-1693 Ideal Electrie Zttt i ii i ..~~.r~f..~.X~...:.~. . . wx P,3IRCEL INIK7 ' ZONA CODB: VA ' USE:. UA sUsnIVIsZrrN: " oto aLOCx/Lar#: ' o/ w~ P'~~` fit3MMAR3C'~'w E5'£Ih1AT8D PROJECT VRLUATIOId: 1,407.00' sFESS. , . . Pesittit Foe , . . 66.2$ . . Total Valuat3on' .00 UssTax 25.20 . . . ks;'TO'TTtT, x• 91:48- ..~rw~.,~r COYYCZitiOI36: . . Mu,st: 4empkY.w/ 200 ~2kC & 2605 NEC. . . . . . I herehy cekClfy GhBt thepaCback dtsGancee proppaed.by thie peYmit.applicatSOn are accurate, and doiiOt violat8 app3i6abY44 . oz^Uinancea, tuFps bx regu}a41pne 9f~t,he City ofwheat Ridge or covenante,eaaemants or reatrictiona.of secord;fthRt~,AlY. maaauremp(?teaharea, aMd allegations~made are aecuzateithat i have read anCagree 2oabiae by nllconditimna pr#nte6 on this . aFpl#cation,araiChaC I asaume f511.1.=eepofieibillty for compliance witfi the wheacRidge auildixtg Code„(I.H.C) anC::43,9bher; . app21cab1e i7heb4iCge OidSsla 9, Ear vork unfler thia permit. Piane aubject io field inspection. . signature n€ contracCorfaimx . aace . . . . . 1. TfSis pa'i(qfCwa6isYtied`in aCeoFddnce wyth Gfie provieiona eet forth in your.appluatioa aad ie stil'sject to thp..laas af the . $~pte AL,6a3QiatWYend to t.l,e, Zotcij)g RmgulaKlone andSWlding.Cddee of Nheat8id9e, Co3oxado or:agly other appi icatri,e . o;dinanCSa of cne tlty;. 2. "Phis pgzmlt:aPa31 e%.p1ie i60 dsyd..~,lYdm ttA i,g6ua date,'Rexpeeta tGr an extenBion muntbe rece}vedprior Co expirtkion ~ . d9.6tr. ~if ekC4titlOrt mey'DS'gLaliste,6 Et ChE 142BCTetiqn tlL ttE Bu,iSdinj 61EioSa3. ' 3. T.Y Ghi,e yezmlC e,~iree;a iiev eermit may bescquired fcr a fee ofone-ha1Lthe amouat+wamelly reguired, Brpuidtd na chpqged bpve:3'SCen br, will.lfg~7odCe'.in the tlrigiflal' plane and apepificationaaxi any euepeneim or:ahattdoNaept ha4 ho4 .;-eOW}[G¢ed 4ue-, td3 Yktar._.~ $f Ptiaogee kave kieen. or iE auaPenaion: crabandonment ewceede one (i) Ytar.. [ull feC'B. ehai9 . $o F1pid £PC L 4M1aW ,~Z~41k. . . . . . , n, iW etoTk o# amy meuaxpt^ ef1N7.1 1*,6qi4e ChaY vtli change the natural~ Liow of wacer causing a drdinagepzeblcw. ' 5. -CGnCi'aetai Bhpk1 ilbtif$<'CRY4"eu¢4d#txj YAepeCtor twepty-,four (24) houra Snadvance for a21 teiapecliona atid'ehal3 receivewrittMS dppscval 6n inBpeCCdOn car$ bpfore psoeeeding with succceeive phasea of the job. B. .The 10ejlah¢k,aP a glYn.it Oan Sibe-apgsoval OS'-ds8wings.-artd mpeai€fcatione aIlall rwE be constnxQd ko'b'e a p¢rnfYt Lot, narau apipsdval9PA°1Wiy rfolRO-oa ot''tha prqvieione of'[5ebuildingcodee or any other ordinancp, law, cule or.r,kyulatios.plai'v YtviaMx Se e' fie3.d inepaCtione. sign&wrti of e!Yiaet" 3profEicaai ' . . . aaee , . . . . ; . , SNSBE~CT~~, ST LZM C303)234-5433 BUTLDTNG OFFICE: f303J235-2855 RE¢UsS'TS MfSS4"'_BE MAD~', 8Y` 3Flh ANi' BtT8IN8SSDAY FOR~INSPSCTION THE" FOLLOWINSd 9TJSINSSS DAY.; z : < . . : . . , . . : , . . <~t ~ . _ . oF'""E+r,~~ City of Wheat Ridge Building Division ~ m 7500 W. 29th Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 " Fax: 303-235-2857 ~ o Inspection Line: 303-234-5933 ~<ORP~ ~ Building Permit Application Date: Plan Permit#: C Property Address: ~'C1 ~ 2 .S IO Ne,.,i/4,,,(-k s/- Property Owner (please print) : lz"a ,c ~z ~ 1,4 ~ Phone: _ Mailing Address: (if different than property address) Address: City, State, Contractoc Z/C Contractor License o01 Phone: ~0,7 - 7o Y j i Sub Contractors: Electrical City License #:0 2 (6~i7 Plumbing City License Mechanical City license Company: Company Company: Exp. Date: Exp. Date: Exp. Date: Approval: Approval: Approval: Use of space (description): l/ll LTv e6z91LW,-6 Construction Value: $ /~{C~. ~ Description of work• !as calculated per the Buildinp Valuation Data sheeq Plan Review (due at time ot submittal): E Sq. FL/LFt added: Squares BTU's Gallons Amps Z uU OWNER/CON7RACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify lhat the setback distances proposed by this permit application are accurete, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for work under this permit. Plans subject to field inspectlon. CIRLCE ONE:: (OWNER) C-O-NT~RACTO--R-) )or PERSONAL REP SENTATNEof (OWNER) (CONTRATOR) PRINT NAME:~~Cl7~~L GL~~L~f SIGNATURE: Date: DEPARTMENT USE ONLY ZONING COMMENTS: Zoning: Reviewer PUBLIC WORKS COMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: OCCUPANCY: Reviewer FIRE DEPARTMENT:: ❑ approved w/ comments ❑ disapproved ❑ no review required