Loading...
HomeMy WebLinkAbout4305 Newland Street■wsk ■ ,:.w Off' / \A9111k :IIIIIIIIIIIIII11k Inspections will not be made unless this card is posted on the building site Call by 3:00 PM to receive inspection the following business day, INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS Job FOUNDATION INSPECTIONS DATE INSPECTOR INITIALS COMMENTS: Footings /Caissons ` Electrical Service Stemwall / (CEG) Concrete Encased Ground Rough Plumbing Reinforcing or Monolithic :Gas Piping Weatherproof/ French Drain Rough Mechanical ABOVE Framing INSPECTIONS TO BE SIGNED PRIOR TO PROCEEDING Insulation Sewer Service Lines ;Drywall Screw Water Service Lines POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED CONCRETE SLAB FLOOR Electrical (Underground) Plumbing (Underground) (; :Heating (Underground) `DO NOT POUR FLOOR UNTIL ABOVE HAS BEENSIGNED � 'RoucHS' - Sheathing- Lath / Wall tie Mid -Roof Electrical Service Rough Electric Rough Plumbing :Gas Piping Rough Mechanical ABOVE Framing INSPECTIONS TO BE SIGNED PRIOR TO PROCEEDING Insulation ;Drywall Screw F NALS ectrical umbing Mechanical Roof Building Final Fire Department R.O.W & Drainage INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS Parking & Landscaping i - .SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS. von IIrlt AI c yr vCCUPANCY IS ISSUED, f-INAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTE AUTHORIZATION OF A CERTIFICATE OF OCCUPANCY NOR PERMISSION FOR OCCUPANCY OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF OCCUPANCY IS ISSUED PROTECT THIS CARD FROM THE WEATHER rz r ♦ i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE r: Inspection Type: 2D6f- Job Address: ~4 U Permit Number: f 1~1~ I ❑ No one available for inspection: Time ~ WJPM Re-Inspection required: Yes No When corrections have been made, call for re-inspection at 303-234-5933 Date: DO NC rr ! ` Inspector: 1L, \!i REMOVE THIS /NOTICE ♦ A i CITY OF WHEAT RIDGE ' Building Inspection Division r' (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Ny % , Job Address: J~ ~v J ?Y Permit Number: ~t s 3 ! ❑ No one available for inspection: Tirr Re-Inspection required: Yes No *When corrections have been made, call for Date: 2 c Inspector: DO NOT REMOVE Th ♦ i CITY OF WHEAT RIDGE Building Inspection Division r (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: V"e Nt> 3 Job Address: 14305 Permit Number: 0 Z 6 r=: No one available for inspection: Time1 1 L ~Af /PM ` Re-Inspection required:es ~ No When corrections have been made, oali for re-inspection at 303-234-5933 ~ r ( Date: Inspector: LOON-y I DO NOT REMOVE THIS NOTICE " 1 City of Wheat Ridge rOooor Residential Roofing PER PERMIT NO: 093831 ;If JOB 'ADDRESS:. 4305 NEWLAND ST E} DESCRIPTION: Reroof .20 sqs VIIT - 093831 SUED: 11/03/2009 ?IRES: 05/02/2010 ***`:CONTACTS owner 720/979-7042 Taylor Mead sub 303/471-4213 Tina Hubbell 09-0446 Creative Cover Inc.` PARCEL INFO ZONE CODE: UA USE: UA SUBDIVISION:'- 0404 ''.BLOCK/LOT#: 0/ FEE SUMMARY ESTIMATED PROJECT VALUATION: 5,000.00 FEES Permit Fee .144.70 Total Valuation .00 Use ;Tax 90.00 TOTAL 234.70 t~~ ✓ 1.1~ Conditions: 6 nail installation mid-roof inspection required. Board sheathing spaced more than `a 1/2 of an inch apart requires plywood overlay on entire roof. Ice and water shield required from eave edge to 2' inside exterior walls. ***Contractor/Property owner shall 'provide 'ladder(s) secured in place for inpsections.' Subject to field .inspection. I hereby certify, that the setback distances proposed by this permit application. are accurate, and do not violate applicable ordinances, rules or regulations of the City of 'Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditionsprinted on this application and that I assume full.'. responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applic ble Wheat Ridge ordinances, for work under this permit. Plans subject to field inspection. JA~ Q ~t Nog signature of contractor/owner 'date 1. This permit was issued in accordance with the provisions set forth: in your application and is subject to the laws of the state of Colorado and to the Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any, other applicable ordinances of the City. 3 This permit shall expire 180 days from the issue date. Requests for an extension must be received prior to expiration date. An extension maybe granted at the discretion of the Building Official. 3. If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one -(1) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees 'shall kY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City of Wheat Ridge Building Division m 7500 W. 29th Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 °ocoRr~° Inspection Line: 303-234-5933 Building Permit Application PropgrtyAddresss 11e~-olcd d ~z Property Owner (please print): Mailing Address: (if different than property address) Address: Date: Plan Permit M Phone: City, State, Zip: Contractor: acQc+g- mye Contractor License Phone: Sub Contractors. Electrical City License Company: Plumbing City License Company Mechanical City License Company: Exp. Date: Exp. Date: Exp. Date: Approval: Approval: Approval: Use of space (description): Construction Value: $ Description of workk p (as calculated per the Building Valuation Data sheet) ((~Q~ -3 1 c-6 Plan Review (due at time of submittal): b a Q eek:We 5( -'W \ am . Sq. Ft./L.Ft added: Squares BTU's Gallons Amps OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT 1 hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for. work under this permit. Plans subject to field inspection. CIRLCE ONE:: '--(yO-WNER) CONTRACTOR or PERSONAL REPR SENTATI(VE`of (pO~WpNER(~) (I~CONTRATOR) PRINT NAME: _ t tY\Ct ~ ~JnY~~ I SIGNATURE: r `mil Cj~]Q.X.y Date: v ~ w~ ~ m N 7 w0 ?o ~ q mm W O W = ' O 7 N S G fD O' N (D 7 N a m 1 0 O ~ ~ ~ N a m ~ 0 m d C- 0 a D a a ~ (D N N ~ ` , t^, vV 0 \ ~ ~ O (D C QJ Z ~ ~ (D W 0 ~ v 0 ~ m < ~ N n r , Z Ny ~ ~ o m 0 y ~ (D 0 0 ~ m -o ~ 0 m ~ S s n s m ~ m ~ 2 0 p ~ m T 0 ~ 0 m C) > v (n n X ~ ~ A O -u ~ D v A rtl ~ n Z -1 ~ O X 0 ~ m m - ° <PQ" 9 a p1 0~ ~ H ~ ~ ~ Q m ~ z V1 n~ cf ~ W Z o - N ~ p C y m X W 0 ~ a N ~ W " O O O m ~m (1) ~ W d Q m m Z N p Q a - fD d O m Q J J. N y CD w Q' aa~ 3~2 0. ~ Q ~ 3n c m o c ov w ~ n s ~ s a rD 2Ls.. N h o ~o S A o O " Q m ~ n n~ fo C Q~ Q Z o s m (D " 1 ~ a o < a c O D n m a ° ~D O 7J Q ~ ° o m = ~ m s " m m~ Q m am m W ~ ~O P d (a C ~ d n 6 p ~ m A ( ~ W O v ~ ~ 0 a n m 3 Z ~ N J o m ~p m ~ e+ ~ n 3. d ~ N J ~ n (p y ~ A ¢ ~ t+ y N a O O c m A N N 9 A J ~ a c: \y1 y lJ I~ ~ ~ OI..I J O ~y l 1 ~ ~ Date• ~ A Certificate of Occupancy or Completion has been requested for: AnoRess: -4- C:, r~;_ &~j" [ 1 ~i fi_j PuRPOSe or Building Departrnent Approvai: Remarks: Zoning Approvali .l 1 Remarks: Public Works Approval: Remarks: L Fire Marshal( ApprovaL• (if Applicabie) Remarks: Sanitation Disuict Approval: (lf Applicable) Remarks: Water D[strict Approval: (lf Applicable) Remarks: INSPECTIONS WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE BUILDING SITE 24 HOURS NOTICE REQUIRED FOR INSPECTIONS WHEAT RIDGE, COLORADO 7500 WEST 29th AVENUE (303) 234-5933 INSPECTION RECORD JOB ADDRESS TYPE OCCUPANCY BUILDWG PERMIT N0. ~r~~~ DATE ISSUED D~ OWNERYA//'IhVLO I-V tW~7il:i J CONTRACTOR SETBACKSFROM PROPERTYLINES: NORTH SOUTH EAST WEST POUR NO CONCHFTE UNTIL ABOVE H;,~s BEEN SiGP;ED INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB INSPECTION DATE INSPECTOR Foundations Footings Caissons Reinforcing or Monolithic Weatherproofing Concrete Slab Roor: Electrical (Ground Work) Plumbing (Ground Work) Do Nor PouR FLooR UrvTiL AeovE Has BLFN SicNED Rough Electrical Rough Plumbing Air Test Gas Piping Rough Heating & Ventilation Framing ~ Insulation Drywall Nailing Roofing Refrigeration Electrical Underground Final Electrical Plumbing Heating & Ventilation Frame ~._CqC R.O.W. & Drainage Fire Department Parking & Landscaping OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF OCCUPANCY IS ISSUED oPnTECT THIS CARD FROM TNF WFATHFR COMMUNITY DEVELOPMENT DEPARTMENT Building Permit Number : 16393 BUILDING INSPECTION LINE -(303-254-5953) Date : 10/29/2003 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80033 - (303-235-2855) Property Owner: MARK & SAMONE MEDINA Property Address: 4305 NEWLAND ST Phone : 403-0102 Contractor License No. : Company: Phone: OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value : $13,000.00 I hereby certify that the setback distances proposed by this permit application are accurale, and Permit Fee : $290.30 do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or easements or reslrictions of record; thal all measurements shown, and allegations covenants Plan Review Fee : $188.70 , made are accurate; ihat I have read and agree lo a' e by all ndilions printed on this i e heat Ridge Building - Use Tax : $260.00 w appliration, and that I assume full responsibili f omp~ n Code (U.B.C.) and all olher applicable W he i e o ce , for wo under this permit DATE O Z ~ TO121: $739.00 (OWNER)(CONTRACTOR)SIGNED _ Use: 24 X 24 DETACHED GARAGE W/ UPPER LEVEL FOR STORAGE. DEMO ON CARPORT Description : BEFORE FOUNDATION IS STARTED. ~~~'~~~v 4~ BUILDING DEPARTMENT USE ONLY ~~~woh, SIC Sq. Ft. 46 Approval : MR OWNER IS USING EXISTING DRIVEWAY. GARAGE CANNOT Zoning : R-2 EXCEED 20' TO MID-ROOF. SECOND STORY CANNOT BE USED AS A SEPARATE UNIT. rrw" ~~MRSOK. 10127103. NO ELECT., PLUMB., ME;~~ F PERMIT Approval. DM ; Onwi ~pr y tesponsible tor loeatTng p*opeRy ng improvcments according to th0 Approval : 4~d~P required devetopment standarda. blp foS inaccuratelinfotmatl0n Occupancy : Walls : Roof ~~►~~'conskuatl00 i oft Electrical License No : Plumbing License No Mechanical License No : Company: Company: Company: Expiration Date : Expiration Date : Expiration Date : Approval : Approval : Approval : (1) This permit was issued in accordance with the provisions sel (orth in yopur application and is subject lo the laws of the State of Colorado and to lhe Zoning Regulations and Building Cotle of W heat Ridge, Colorado or any other applicable ordinances of ihe City. (2) This permit shall expire i( (A) the work authorized is not commenced within sizry (80) days from issue dale or (B) the building authorized is suspended or abandoned for a perioa of 120 days. (3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provitled no changes hava been or will be made in e original plans and specifcations and any suspension or abantlonment has not exceaded one (t) year. If changes are maae or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new partnit. (4) No work of any manner shall 6e done that will change the natural tlow of vrater causing a drainage problem. (5) Contractor shall notiry the Building Inspector twenty-four (24) houre in advance for all inspeclions and shall receive written approval on inspecfion card before pmceediing with successive phases of the job. (6) The issua f a pertnit orthe approval of drewings and speciflcations shall not be construed to 6e a parmit for, nor an appmval of, any violation of the pro of e b'I ' 6des or any other ordinance, law, rule or re9ulation. Chief Building In a ector ' Please sign Terms and Conditions on reverse side of page. Joaejlsiw~~y sapoo 080'kfe aoW uued ~4-14 ~ueyl ES8Z-5£Z-£0£ le aw pejuoo aseald suoilsanb Aue aney no,( }i 'Mainaj jo} llwqnsai pue ieuiwqns aya ol suogoajjoO Jo suoilippe asaya a~ew aseald ) I x f~ r/ ?ON -'pasodoid ji ueld leo u13918 ue apinad 'g if aW t,I- ~~01 £ x,£ pasodad sjoop jo smopuiM /ue MoUS 9 `uti*~r 'Buuaaw6ua apinad 'peol 16iod weaq uoddns oa japeay joop a6eie6 u6isa4 y •peol 6wpao 6uiuoddns }i „L-£Z ueds ol wnwiww o,o „Z~ @7 gxZ aq o> >siof 6uili83 ioog puooaS 'E x,Oj / sueid uo 4lPiM Joop a6eJe6 apinad Z veld uoilepunol paiaaw6ua ue annbaa sainjanils /jo;s oMl EOOZ'£ljaqolap :,.)1u(I ~-n :Xanndnaap 96eie6 /jols-Z :1aafirrd ~ JauMOawoH :ao;anaJuoJ ewpaW ~ ¢¢o f / 199iiS pueIMaN 50£4 :sso.ippv sIuaiaMoJ maUag unId mPlmg uoisLniQ saainaas uoiliadsuI ~o~ ad ( 8u~p~mg;a,4J ~ va19^uiaiioalru'.wq'»ucmpmiaylo.(u~ Am n y~)osuas~~oid a,p jo uonqou :u. •jo p..aede ue .oa 'io) uuuaa ~ aq m W^as~"9 rou II^I~ fq^ng~vds pu. sm..upjo ~uo~de. aqi .o n e)o aauenm aq7, (9) '9o(mP lo sas4d ausnams T,.w Rmpaiwd aap9 pm wn~ds~~ uo Fnadds wuuw a..uav ntqS wll "-d°- iF nj -p• a! snwv (~U,ooj44~1 w"dFUl aUTPOre -a Npou m* ,axuW:) (S) 'w.n9wd a8smup a Smmo uicwJo wqu rymm .N 32.01, p,w. IM woP N 1RV+ Aus Jo kom oV (N t,wuA xau t ml Pmd ~911Ns " R-Y'm! ~+9N~ra Nawuopueqe io uwsuadsns j. w uaaq an. y sa8usq~ 11 (1) aw WP~a au M tuw"'0Duv9l io uaavadms [ue qn svoneayt»ds P'rt s-md FwiAuo aP m 2Pew *Q Ii'.x w uaaq a,ry saAUe4, ou pap~wd qannbv Cpaw+ou rvnaue aip lIN-wojo aaJ t ioj pvmbx.Q [ew mund wxi e'smuMa nuuad nT11 (CI 'uR OZ 11. P°"ad P'n°p°pt io papuadms si pazuWna Rmplm9 V (0) +o aiR ans, uay s(R (09) Cws myu.w p+amwww rou n pazunqmg +Now aN (V ) l! ui4"a peys uwud situ (Z) .4iJ>yp )o sa~usmpio "rIdd, W.A. nw opuqoJ'agPM m4M1o T;iWJ Sutpung pue suaiqtiiay 8muvL a43 m Put opuqoD Jo an5 atp jo sxq ayp m uafqns n pue uousmidde mM ui yuq us suas..wE aN p,.w awepuoar m pa~ss, n.w nuuad tuLL (I l :lenoi y Iena y je.koi y ale(I aoy¢ndx3 aleQ uo9endx3 :ate(j uonendx3 ,CuedmoD :oK am33i-l jcmeqlaw suun lelluaplsag :sauols +--o 1 -Zp a ~ ,ocv . 5~.. ,i'INO :4xv o, n ,(aedmoz) :o,g asaan-iZ 8a?qumid 3oo,d sIIEM YA V ~ ,(uedwoo oN asaairi Iemwoo(3 .C:)aedn»p jenoiddy :taHawwo7 sMaoM DMnd Q :jenoiddy sam3wwo3 oNimina lutuoZ Ienosddy :sanawwoo oNU+oZ ,vv~ ~lu>~ P~vw /ni .(1./asorS aiesevo ` :r5t/,iv~,.S' ao~ / ~ns~/ ✓.~t/t~n y~t_✓1~ h~-p'/st° P/lnp C71 L~u•/°~ 6niifS~n~*'a~' ~VO[1.dIiI~S3R ~G ~31tl4 ,~(y~ - - IWaaLUraa.(noLva.i.No-)xaau.HO) S.jEloZ S:xeZ asn g:aa3 MWnag ueld $:aa3lluuad $:2R[En LI0113TU1SU0D iN3W33tl9tl aVtl WUVtl1Sli34S.1 30 311.llY VDIS UO1Jv111%OJM3S."0 ,Cuedwo~ auoqd :014 asua31 7 to»enuoD £EOOB oJ a6P1a'1NdyM :ss31PPVf icadoid Zoip-£oh'£o£ :auo4d is f1ivN/MdNS0£17 yi`!~Pali/ "aN3WH~F ,~i~'lvU~ :1au.rprG~adoid hLfh•lZb MAf.~ "Mff V oo. ao (SSSZ-S£Z-£0£) - ff008 OJ `3gQ1'd L`d3H•1& 3,143Atl H16Z ,LS3hN OOSL 3DQRI ,Ltl31LN 30 x.LIJ o ~ 01eQ ££65-6£Z-£0£ - 3MI'i AI0I133dS,~II 9VIQ'II[iH nqum,,~ 7nwad 8mppg ,LsI3W.L2Itld3Q .L43W410'I3A3Q A.LIW1101i03 . , . PUUad s.y1 Npun X,om A) `5awewP P. l~+yM)alldde nyW pe Pue (J-H'N 2P°J swppng >8p~ I¢ay,~ ayt 4u.w a3ueqdwoo loJ Rupqtsuodsm pn} winsse I leyl Puc uoqeoqdde s,qt uo paiuud suonipuoo IF.Cq apiqe oi am9e pue pw aAey I leql t21un3oe aie apew suonc3alle pua'u...oys stuaw~nsvw pe 1e4p 'P~o~}o suoWwsai io ~'sluew..oo io a8piy ieay,~&Jo A!J r0.lo suonejn9ai ~o sa~ni `sa~ucuipw 3lqe°4dd8 ~tc(ou wu op pue '3lemaoe ~ie uonnqdde P=ad si41 R4 Pasodoid sa3umsip 13eqtas oyt teyt ipu» Aqm"4 I Directiona Fill in the blanks on pages 2 and 3 with dimensions I I and materials which will be used to build the suucture. Please print legibly. 2. Indicate in the check boxes on page 3 which detai] from page 4 wil] be used. Note: Hea[ed garages may reguire special provisions. Dimension 2-4 ' Locate and Indicate ratter or detail bracing , . truss direction O Garage Is heated 9Tarage Is not heated Show door and window header sizes and location and size of landing in front of door Floor slope ~3'/z" minimum concrete slab C__) II header rs/ z, ,o ote: trusses o roof rVecia r rafters beaon headl header design may be required Double 2x4 or 2x6 trimmers each ~ end of overhead d door header dooropening width Dimension*~_ ' Z8" minimum, wilh plywood sheathing on outside ot entire wall Dimension•~ wiCi hold downs. If less than 2' 8°, engineering may be required. This handovt was developed Mthe Cobrado Chapter of the Internalional Code Council as a basic plan submittel under Me 2000 Internatbnal Residential Code. It is not intended to cover all circumstances. Check with your Depertrnent of Building Safery br atldftional requirements. d,8M2 Note: For roofs with slopes between 2:12-4:12, follow manufacturer's instrustions tor low slope application of roofing material. ❑ Truss or 2x-6'.rafters spaceda " O.C. lexemde: Pul Meckmark in ba -or- 2 x 10 ReRers Speced 24' O.C.) r Minimum lx !"Z ridge board 3 Roof 61 ~a: , Provide roof tie downs and solid 2x blocking between rafters (20 2 or greater) Note: Pre-engineered roof trusses wftruss clips and hardened nails may be used in lieu ot root structure shown. Diagonal wind bracing or plYwood sheaz panels @ corners and each 25' of wali. Ceiling lnsulation -t Mw e_ (R heetetl - exertple: R-38) 2xL,,a_cei1in9 joists @~O.C. (ea mple: 2 x 8 B 24' O.C.) Double 2x~top plate - (uem 2x6) Span R3 1 (exemple:23'S') Ceiling height g ~ 1eFrorri77) Wall sheathingj~/~ vSQ 2x-4_studs @ / ~O O.C. (exenw*: 2 x 8 B 2d' O.C.) . A 3FFoundatlon Deteil A ❑ Foundation Detail B ~ Cont. 2x~sil1 plate B (exempb: 2 x B) Wall Insulation h o~ L (Nheated-eremWe:fl-79RE~ergkssBntts) ~ Footing size_x_ (exempW: 8' x 18') Eo ~do~c was d~bv~ br me caor~do cn~c~r ot me ional Code Council as a basic plan submittal undet In[ernatanal Residentlal Code. It is not intended r ell circumstences. Check with your Department of Safety for additbnal requirements. 3 a r s s N ~ ~ f, . .~s ~f L ~ f ~ ?o D 7k . red v~;a~a ~~~r.•tq,s:~ Yr . ~ 9.1 ~ 3~-T I CD (~3'y \ osS ~ tll~ F ( i ~ C/~ss 3 TB ~ ~ T. s : ~x ~dE 49eAab i. . X~ i ~ - - ~ a----~ aX Q' /~R,'Nff S 24➢ -.2 - ax y To P pIA4~a s~eete~i 9 a/d S. D~ ~ sxq l&" o.~. CoNr ax y Se ch' Pl'oOro \7 4,~ ► t~ I l. O. C. ,b A#ie. Acep.sil G %'1isTCT~I~~ vV I+VDowD .:2 y zSz" A7T/ i,- /jCC PSS L.vY~Vtr . '1 S~, f' X ~ v t I ' M ~ cVIamN 1 m ~i Z. ~ . ' W x' (IV F~ f3 ~'e 5~ ~ 0 S - - 1$~ ~ ' L ~ a1A1K ~ A ~ -c~ ~ r ; . N , N, 2 y~ ~ ~ ~ s 'te ' { ~ u !f► ~ _ 8 s o ~ e /1c /O ~i a9g~; e. C1,4ss A 3 rAB t B re /t' lea'r4+ff S a59 "c"A. a. ~ - ax To P l~~~~. ZK4 lP."~ O.~S. C'oAIT' Jxk SeCA P1,44~ z-0 0 Ita 0.4:. ~ ;a~~' ~ .M ~ . m x . M vV iiV.Doa) -2y xSz " A7Ti i~- f{C C PSS L.4ns~s~ L . ~ ou rd I M X.E7 l!3 x' ~v a F~ Qa 50 ~~Yp OI- ~ ~ G/T STRUCTURAL ENGWEERS P.O. Box 370307 DENVER, COLORADO 80237 303-337-57 i 1 October 22, 2003 Project No. 03-1100 Mark Medina 4305 Newland Street Wheat Ridge, CO 80033 RE: Structural calculations 4305 Newland Street Dear Mark: This letter is a cover letter for the calculations for the project at 4305 Newland Street Street. Please contact our office if you have any questions regarding this letter, and certainly call again when we can be of further assistance. ' cerely, ry L. olte GLB/mdt International Bui Uniformly Gary L. Bo~te GIT S?000ra1 Eng neers Code2- 0 3 72: OS28 pM' 6.00 Prolect: 03-1100 - Location: FLOOR BEAM Summary: ( 3) 1.75 IN x 9.25 IN x 12.0 FT I 1.9E Microllam - Trus Joist-MacMillan Section Adequate BY: 17.5% Controllinp Factor: Moment of Inertia l Depth Required 8.77 In ` Laminations are to be fully connected to provide uniform transfer of loads to all members Deflections: DLD= 0.14 IN 0.34 IN = L/423 0.48 IN = L/301 Dead Load: LLD= Live Load: TLD= Total Load: Reactions (Each End): LL-Wcn= Live Load: DL-Rxn= Dead Load: TL-Rxn= Total Load: Bearing Length Required (Beam only, support capaciry not checked): BL= 2880 LB 1171 LB 4051 LB 1.03 IN Beam Data: L= 12.0 FT Span: Lu= 0.0 FT Unbraced Lenqth-Top of Beam: L/ 360 Live Load Deflect. Criteria: L/ 240 Total Load Deflect. Criteria: Floor Loading: LLI= 40.0 PSF Floor Live Load-Side One: DL1= 15.0 PSF Floor Dead Load-Side One: Tyy1= 12.0 FT Tributary Width-Side One: LL2= 40.0 PSF Floor Live Load-Side Two: pL2= 15.0 PSF Floor Dead Load-Side Two: Tyy2= 0.0 FT Tributary Width-Side Two: Cd= 1.00 Live Load Duration Factor: Wp,LL= 0 PLF Wall Load: Beam Loading: WL= 480 PLF Beam Total Live Load: ggW= 15 PLF Beam Self Weiqht: wp= 195 PLF Beam Total Dead Load: WT= 675 PLF Total Maximum Load: Properties For: 1.9E Microllam- Trus Joist-MacMillan Fb= 2600 PSI Bendinq Stress: Fv= 285 PSI Shear Stress: E= 1900000 PSI Modulus of Elasticitv: perp= Fc 750 PSI Stress Perpendicular to Grain: _ Adjusted Properties Fb'= 2694 PSI Fb' (Tension): Adjustment Factors: Cd=1.00 Cf=1.04 Fv'= 285 PSI Fv': Adiustment Factors: Cd=1.00 Design Requirements: M= 12153 FT-LB Controlling Moment: 6.0 ft from left support Critical moment created bv combining all dead and live loads. V= 3565 LB Controllinp Shear: At a distance d from support. Critical shear created by combininq all dead and live loads. Comparisons With Required Sections: Sreq= 54.14 IN3 Section Modulus (Moment): g= 74.87 IN3 Areq= 18.76 W2 Area (Shear): q= 48.56 IN2 Ireq= 294.62 IN4 Moment of Inertia (Deflection): I= 34626 IN4 Uniformly Loaded Floor Beam[ 2000 International Building Code (97 NDS) ] Ver: 6.00 By: Gary L. Bolte , G/T Structural Engineers on: 10-22-2003 Project: 03-1100 - Location: FLOOR BEAM Summary: ( 3) 1.75 IN x 9.25 IN x 12.0 FT / 1.9E Microllam - Trus Joist-MacMillan Section Adequate By: 17.5% Controllinq Factor• Moment of Inertia / Depth Required 8.77 In f . - - -W - - - - i_ - - Span = 12 ft Reactions Live LoadDead Load Total Load Uqlift Load A 2880 Lb 1171 Lb 4051 Lb 781 Lb B 2880 Lb 1171 Lb 4051 Lb 781 Lb Span Uniform Loading Live LoadDead LoadSelf WeiqhtTotal Load W 480 Plf 180 Plf 15 Plf 675 Plf Floor Joistf 2000 International Buildinp Code (97 NDS) 1 Ver: 6.00 By: Gary L. Bolte, GIT Structural Engineers on: 10-21-2003 : 3:38:25 PM Prolect: 03-1100 - Location: FLOOR JOISTS Summary: 5 IN x 925 IN x 12.0 FT (a~ 16 O.C. I#2 - Hem-Fir - DN Use 1 . Section Adequate By: 452% Controlling Factor: Section Modulus / Depth Required 8.07 In Center Span Deflections: Dead Load: DLD-Center= 0.07 IN Live load: LLD-Center= TLD-Center= 0.19 0.27 IN = U744 IN = L/541 Total Load: Center Span Left End Reactions (Support A): LL-Rxn-A= 320 LB Live Load: Dead Load: DL-Rxn-A= 120 LB Total Load: TL-Rxn-A= Bearinp Lenqth Required (Beam only, support capacity not checked): BL-A= 440 0.72 LB IN Center Span Riqht End Reactions (Support B): LL-Rxn-6= 320 LB Live Load: Dead Load: DL-Rxn-B= 120 LB Total Load: TL-Rxn-6= Bearing Length Required (Beam only, support capacity not checked): BL-B= 440 0.72 LB IN JoistData: Center Span Lenpth: ~2= ~2.0 FT Floor sheathinq applied to top of loists-top of joists fully braced. 1 00 Live Load Duration Factor: Cd= . 480 Live Load Deflect. Criteria: 360 Total Load Deflect. Criteria: Center Span Loadinq: Uniform Floor Loadinp: LL-2= 40.0 PSF Live Load: DL-2= 15.0 PSF Dead Load: TL-2= 55.0 PSF Total Load: Total Load Adjusted for Joist Spacing: W7_2= 73 PLF Properties For: #2- Hem-Fir Fb= 850 PSI Bendinp Stress: F~= 75 PSI Shear Stress: E= 1300000 PSI Modulus of Elasticity: Fc-perp= 405 PSI Stress Perpendicular to Grain: Adjusted Properties Fb~= 1075 PSI Fb' (Tension): Adjustment Factors: Cd=1.00 Cf=1.10 Cr=1.15 Fv'= 75 PSI Fv': Adiustment Factors: Cd=1.00 Design Requirements: M= 1320 FT-LB Controllinp Moment: 0 Ft from left support of span 2(Center Span) 6 . Critical moment created bv combining all dead loads and live loads on span (s) 2 387 LB Controllinp Shear: At a distance d from riqht support of span 2(Center Span) Critical shear created bv combininp all dead loads and live loads on span(s ) 2 Comparisons With Required Sections: Sreq= 14.73 IN3 Section Modulus (Moment): g= 21.39 IN3 Areq= 7.74 IN2 Area (Shear): q= 13.88 IN2 Moment of Inertia (Deflection): Ireq= 1= 65.79 98.93 IN4 IN4 Floor Joist[ 2000 International Building Code (97 NDS) ] Ver: 6.00 By: Gary L. Bolte , G/T Structural Engineers on: 10-21-2003 Project: 03-1100 - Location: FLOOR JOISTS Summary: 1.5 IN x 925 IN x 12.0 FT @ 16 O.C. I#2 - Hem-Fir - Dry Use 0,...,;,.., nAe„11nfo Rv d5 9°/ [:ontrollina Factor: Section Modulus / Depth Required 8.07 In - _ - - ~lll [ - - - . - - - - . - - - _ ~ - _ - - - _ _ - B A j , Center Span = 12 ft Reactions Live LoadDead Load Total Load Uolift Load A 320 Lb 120 Lb 440 Lb 80 Lb B 320 Lb 120 Lb 440 Lb 80 Lb Center Sqan Uniform Loading Live LoadDead Load Total Load W 40 Psf 15 Psf 55 Psf Roof Beamf 2000 International Buildinp Code (97 NDS)1 Ver: 6.00 gy: Garv L. Bolte , G/T Structural Engineers on: 10-21-2003 : 3:41:03 PM tiorr RIDGE BEAM Prolect: 03-1100 - Loca • Summary: 1.75 IN x 11.875 IN x 12.0 FT I 1.9E Microllam - Trus Joist-MacMillan Section Adequate By: 3.3% Controlling Factor: Section Modulus 1 De DLDeQuired 110.69 In Deflections: Dead Load: LLD= Live Load: TLD= Total Load: LL-Rxn= Reactions (EaLve Load: Dl-Rxn= Dead Load: TL-Rxn= Total Load: ort caPacity not checked): g~= Bearing Length Required (Beam only, supp L= Beam Data: Span: Maximum Unbraced Span: Pitch Of Roof: Live Load Deflect. Criteria: Total Load Deflect. Criteria: Roof Loading: Roof Live Load-Side One: Roof Dead Load-Side One: TributaN Width-Side One: Roof Live Load-Side Two: Roof Dead Load-Side Two: Tributary Width-Side Two: Roof Duration Factor: Beam Self Weipht: Slope/Pitch AAd'lus ed BeamSLenqthads: Beam Uniform Live Load: Beam Uniform Dead Load: Total Uniform Load: B Properties For'end ~q St elssm Trus Joist-MacMillan Shear Stress: Modulus of ElasticitV: Stress Perpendicular to Grain: Adjusted Properties Fb' (Tension): Adjustment Factors: Cd=1.15 Cf=1.00 Fv': Adiustment Factors: Cd=1.15 Design Requi Co tro ling Moment: 6.0 ft from left support bining all dead and live loads. Critical mome q Shear: Controlli At a distance d from support. Critical shear created bV combininq all dead and live loads. Comparisons S ~ction Modulus (Moment): Area (Shear): Moment of Inertia (Deflection): Lu= RP= LI u LL1= DL1= TW1= LL2= DL2= TW2= Cd= BSW= Ladi= wL= wD_adi= wT= Fb= Fv= E_ Fc_perp= Fb'= Fv'= M= V= 0.36 0.55 2160 1152 3312 2.52 12.0 0.0 3 240 180 IN IN = L/398 IN = IJ259 LB LB LB IN FT FT :12 30.0 PSF 15.0 PSF 12.0 FT 30.0 PSF 15.0 PSF 0.0 FT 1.15 g PLF 12.0 FT 360 PLF 192 PLF 552 PLF 2600 PSI 285 PSI 19000 PS 50 I 2994 PSI 328 PSI 9937 FT-LB 2782 LB Sreq= 39.82 13 41 IN3 IN3 g= Areq= . 12.73 IN2 q= 20.78 IN2 Ireq= I= 169.42 244.21 IN4 IN4 Roof Beam[ 2000 International Building Code (97 NDS) ] Ver: 6.00 By: Gary L. Bolte , G/T Structural Engineers on: 10-21-2003 Project: 03-1100 - Location: RIDGE BEAM Summary: 1.75 IN x 11.875 IN x 12.0 FT / 1.9E Microllam - Trus Joist-MacMillan Fn,-rr,r- Ser.tion Modulus / Depth Required 11.68 In V11 . _ _ - - - - = - C- - B r` - Span = 12 ft ~ Reactions Live LoadDead Load Total Load Uplift Load q 2160 Lb 1152 Lb 3312 Lb 768 Lb B 2160 Lb 1152 Lb 3312 Lb 768 Lb Span Uniform Loading Live LoadDead LoadSelf WeiphtTotal Load W 360 Plf 186 Plf 6 Plf 552 Plf Roof Rafterf 2000 International Buildinq Code (97 NDS) 1 Ver: 6.00 By: Gary L. Bolte , G/T Structural Engineers on: 10-21-2003 : 3:42:04 PM Proiect: 03-1100 - Location: RAFTERS Summary. 5 IN x 925 IN x 12.0 FT 24 O.C. I#2 - Hem-Fir - Dry Use 1 . Section Adequate By: 33.7% Controlling Factor: Section Modulus / Depth Required 8.0 In Rafter Span Deflections: DLD-Interior= 0.13 Dead Load: LLD-Interior= 0.24 Live Load: Total Load: TLD-Interior= 0.37 Rafter End Loads and Reactions: LOADS: 180 PLF RXNS: 360 LB Upper Live Load: 95 PLF 190 LB Upper Dead Load: 275 PLF 550 LB Upper Total Load: 180 PLF 360 LB Lower Live Load: 95 PLF 190 LB Lower Dead Load: 275 PLF 550 LB Lower Total Load: Upper Equiv. Tributary Width: UTWeq= 6.0 Lower Equiv. Tributary Width: LTWeq= 6.0 Rafter Data: RafterLoads Interior Span: Eave Span: Rafter Spacing: Rafter Pitch: Roof sheathinq applied to top of joists-Top of rafters fully braced. Live Load Deflect. Criteria: Total Load Deflect. Criteria: L= L-Eave= Spacinp= RP= U L/ IN IN = L/628 IN = U411 FT FT 12.0 FT 0.0 FT 24.0 IN O.C. 4.0 12 240 180 LL= 30.0 PSF DL= 15.0 PSF Cd= 1.15 L-adi= 12.65 FT wL-adi= 54 PLF wD-adi= 28 PLF wT-adj= 82 PLF Fb= 850 PSI Fv= 75 PSI E= 1300000 PSI Fc-perp= 405 PSI Fb'= 1237 PSI Fv'= 86 PSI M= 1649 FT-LB Roof Live Load: Roof Dead Load: Roof Duration Factor: Slope Adjusted Spans And Loads: Interior Span: Rafter Live Load: Rafter Dead Load: Rafter Total Load: Properties For: #2- Hem-Fir Bendinp Stress: Shear Stress: Modulus of Elasticity: Stress Perpendicular to Grain: Adjusted Properties Fb' (Tension): Adjustment Factors: Cd=1.15 Cf=1.10 Cr=1.15 Fv': Adiustment Factors: Cd=1.15 Design Requirements: Controllinp Moment: 6.325 Ft from left support of span 2(Center Span) Critical moment created by combining all dead loads and live loads on span(s) 2 Controllinp Shear: At a distance d from riqht support of span 2(Center Span) Critical shear created by combininq all dead loads and live loads on span(s) 2 Comparisons With Required Sections: Section Modulus (Moment): Area (Shear): Moment of Inertia (Deflection): V= 459 LB Sreq= 16.00 IN3 g= 21.39 IN3 Areq= 7.98 IN2 q= 13.88 IN2 Ireq= 43.32 IN4 1= 98.93 IN4 Roof Rafter[ 2000 International Building Code (97 NDS) ] Ver: 6.00 By: Gary L. Bolte , G/T Structural Engineers on: 10-21-2003 Project: 03-1100 - Location: RAFTERS Summary: 1.5 IN x 9.25 IN x 12.0 FT @ 24 O.C. /#2 - Hem-Fir - Dry Use Section Adequate By: 33 7% Controlling Factor: Section Modulus / Depth Required 8.0 In LOADING DIAGRAM - - - - - - _ - _ - - - Rafter Span = 12 ft(12.65 ft) Rafter Pitch: 4 : 12 Reactions Live LoadDead Load Total Load Uplift Load A 360 Lb 190 Lb 550 Lb 120 Lb B 360 Lb 190 Lb 550 Lb 120 Lb Rafter Span Uniform Loading Live Load Dead Load Total Load W 30 Psf 15 Psf 45 Psf INVOICE N0.03-1100 GIT Structural Engineers (303) 337-5711 Client: Mark Medina 4305 Newland Street Wheat Ridge, CO Job Address: 4305 Newiand Street Invoice Date: October 22, 2003 Description: Foundation & Framing design with drawings. DUE ON WE GREATLY APPRECIATE YOUR PROMPT PAYMENT. PAST DUE INVOICES ARE SUBJECT TO A RE-BILLING FEE. THANK YOU FOR YOUR BUSINESS! Xa►,lp uoen receipt to: oe Gary L. Bolte G/T Structural Engineers P.O. Box 370307 Denver, CO 80237 g ~ 9~ ~ 3 ~ ~ ~ ~ ~ ~ ~ j E. i - d 3 f ~ ~d~ 1 i J ~ ~~4 ~ 1 6. F. ~ a ~ ~ ~ ,r r f ~ s f ~ f { " §i ~ ,gg r/ i s~ rl 41 r i f' I ~ £ d ~ ~ i r ~ t ~ ~ 5=y~ .u ~o.~. ~ _ ~ - _ P £ € : } i I' 'I / j~ [ I / / ~ ~,i f E - h ~f ~ _ ,s ~ ~ I!EE j SS I 9 13 i di E ii I !E 3,i id Ii i =f ' ~ ~ - i[ rE ~ t~ i ~ T-L f 3 ~ ~ i i f ~ d.. £.d d.£ f F i { i ° is f is ! } ? I d E F - w .m +w+ - r-, e ~ ~ .+.i ~ w-: M' d._ ! .r _ ed. 1 ~ i-~- - f Q ? ;L i^{' ":n ~ € -J tt p( i i s 1 £ f{ f: ' i I i F I f 7 3 t £ i ~ ~ ~ F IS i3 r. ti 1 (t !f ~ ~v If e~ ii i dd 1~ ii ! 6~ E£ s~ i ~ ; ~ i °i 6 id fv ~d Fd dd £e ~d f' °f EI f i .I £ E i I ! i ' ~ d E - ~ f i : € i 6 i I i 5 II ~i ;i ~ I ii ~ i d i r ~ [ 1 i i ' ' ~ i i ~ ~ ~ € ; i £ £ ' i~ € Ga E: 9 _ ~ a :st S a fEm3~ ;f ~ _ 3 E f 5 d 3e3 £ 3 f d 3 I i 3 I' ~i ti i } I I ~ 3I £ I d ~i I i ji ! i E=1d ~I !E[ E ! f ~3 ~ v E - ~ ~ dj 3 ~ d i . r-.,r E ~ 3 . 3 [i[ EI E 3 _ ~ I !I o- 1 3 E 1 f £ 1 $ i t: ~3 e E F: ( d i ii i` is ggi d i Ii ] 33 ~ ~ i ! 6 i 6 I I ~ Ij d ~ ] e I ~ j d £ 's? F ~ ~ i [ i ~i $ d E i d E f F d i i t Ij d I _ f 3 ~ i 4 i ~ ~ 1 'i it t~ ! E~' i i f i d€!, i E i' ~1 1 3 : is i : ~ . ' ( a~ a am i f ~ ° e! ' i d . _ 9~ i i s BYUe i i i £ ~ ~ bpp '~F - ~ ! i € i ~ I € g. i ~ ~ 6 s t 'F °7 3 ~ d 3 E 3 3 ~ i S 1 - d Ii v i _...~..u.u u.~........_-tea.. i ~i? ~F3 i~5 p3~ ~pjq} f 6 F~' ' Ty\ j5 a~`1 ~9 .¢.6 a{ 44!! V \ 1 "n. ~l 1 t 44 e... ° i , y~yg [ g a~~ $ - F - 6 S c. x~x 3 ~~~y g:~ i f3a~a. iL ~EV df~~ i~S-`[E S (;~A x€~ i ep 3 g d E E- f i° ~ Ek~pdp y E ~ ~e v E - 3 "a E ~.e ~E 5& Ef yie~z - 6 f 4~$: ~ ~4 $ x ~Z®i € d :Ym'le ~xze f d a. i 3 .3W'e i 'a 3mf~ 6 3da..~ s~s g . „ a g s ~ v,,, q 3~i rmm ~ € g p°®?e~$~° ~5 ° 3'~ "A5 i a*a q yvm a FS I 3 % d - ~ _ s a`e ism i j : a : € . { S z iww S i ~ - - ~ a • ~ q L E & ~E ibm.~ t~ou ~ ors r~ s £ E e ~ ~i~ i®v _ - ~ = - _ ~ ~ _ _ ~ _ ~ ~ ~ ~ ~ ~ ~ ^'y# - 8oen F ~ _ f~ .~.w 'mss Lu~ l 9 bd` . i - - _ f. F b '-'7 5 ~ E m~ smc F ~ 9E ~ i E g£ • 1 t . St ry7'€ i E ~w wF m^ t ~ € € E s a F I I 1 g; ~ _a ~ € ` r 3 1 E pi j £ ! ~ ~ i 3 ■ ' i t i { ~ €S / Y wy BF > . as a s { r. s rr.~. _ E i' F - _ . i _ ~ - F ( t ...Y... ....m. r S[ ...m. --.n ..w r+ ~ ..e.nr .wrr d.... ..z. w..~ ..nmm .n..nn ~e 3 ""--~rmn [ I~ ~ ~3 i~ 53.3 ! I ~ ~ i t_ I r ~ _ : '°5 ~ (t t ~ I ~ ~ i~ i ~ ' ~ ! ~ i i ~ i f j. ~ 4p' ~ 3 _ t 3 i 1 ~ i { v a ~ , ~ d @ E H r i.4.. a .-esq.,. ' 3 ~ a. £ 3 i i i = ~ ~ v ~ 3 s ~ ~ _ € !~°y ~ E i~w~ R F i E ii E f € i =7. _ S I g~ ~ _ s [ ~ _ 5 . € ~ { t:_. k ~t. S ~ ~ 3 y~~ ~ _ ® 68 r (Ef i E ~ FF q~ i ~ ; - ! 't E I I 3 I e s ~ ~ i ! i i i E ~ 68 { I £ 1 E s 3 e $ s' a e § S€ 3 ~ ~ ~ ~ € ~ ~ ' ~ 1 ~ E i ~ { i , a ~ E j~j E 3~se ~ 4 +v.~ 3 ~ ~ d aw f I i O, 3 E jj ~,t 1 ~ t [ E 3 i 3 M^~,'r~~~ 3 a i"r.., _ ~ ~ F ~ 3 ~ 1 ~ i 'W 2 [ IS e E e " - S~.p.u o € 1 L ~ W., ~ ' 3h E `'1 E ~ s _ ~ f~..~...,...---.~ j s,: I ~ ~ ~x Z S y` ug ax 9~ [ 1 let 1 t 11 ~ E i ~ € ~ ~ ~ r € _ i E - I E } e ~ rv f 3 i s ~ ~ ag f i ~ < ?e to _ I [ if e i i : y3t~ £ m 4 ~ t e i E e B t 3 ~ F 1 ! Et g#g € i` f 3 I F ~ - ~ - I e E E L e g~g ~s 3 3 ~ ~ ~ ~ 3 g ~ f ~ 3 3 i - ~ 1 I l; i } / ~ 1 ~ € ~e~ i ~ € i~$ + e s ~~~v,+ Y ~ I ' 3 i."" f ~ 1 i \ ' ~ I i : e t r i ~ d t 4 Y ~ 4 b~ 4 Ib_ 4 4t N"} ~ f ~ b~ k t~ "r°°6`t~ R r a` ~ i + x e' r P'~a F M$' a'b `,i°r~ a ~v sq ~seg 6< e'av;E ~°d," e#4~ ~`e~"%.° a e a~,~#` a 4+ 'm~' N ~ ~ ~d P~~B'.,4 9 w ~ s'4° p7 i ~ ~ ~ i i ~ i F ~ r F r - i ! _ i air+i I. i - i ` E ~~S 3 x 3 Z i i I f ; 1 E ~ 2 { , I j i 1 3 2 _ I i i 0 a A is 2-6 2 SCAII ffi i _ l E f j ~ a 24 ? ? ? PT r IPD _ - = - - = va Y z ? ~ i a U-; / ICUE - x , ~ o _ x i ~ ~ e - i E i ~ x _ t - ip$e~e i x e i a - 6m W Asm @l 5 9 v ' ~ i a ~ ~a'e £ L~ ~ 5a6 3'm - ~ 68n! O ~ m~ of ~ i i ii I■ ~ ~ . ~ ~ _ - ~ se. v amv x _ £ 0 € 5 $ ~ 8 5 3~ xirti 9~ 5 i s ~ 4... - SE, f $YR W,ry E _ - x E€Pxee v x a v - e i f 8aa6 i "c - S€ x~ i S t 9v - £ x e ~ • x v F/=ye i x ~ ' . 94 t~'ya 5 g x - ~:A - m ~ v ? { fi s ~ x~ @ 6 £ ~ ~ £ k 5 x 70~. T~( 59x ~x § . z ~ 3mT 3 i......a iia P:.~ i~E f§9 F T~4 I 35 5 x E E 5~ 3 3 x z- ~ ~ i E - z g € x E F 3 I 3 E 'v z ~ f H i~ i~ x x €p~x_ x F3'.. £ 3?~~E a ERM 3 E YS i#4 ~ e$ ~d A 3 9£ i aw. eA £ : @ - i ~ [ 4 1 ~ '_l'A ~ 'WY's . £ 0 E x ~ 6 1 I5 -~'e WPP iRP6f E x aaW1 ~Z ' r°s PmE' _ p @ - I ~ i . i F z E £ 3 6 ~ i ~ ~ € ~W z~ H . - _ W~W~ - a.. _ "4"i.-- aF~- _ ' .e ~ F F@i9R g ~ ~ ~ .x ' i - v ~ F i - IF 1 E v 6 . 6 e~.we i - ~ € as.ti s ~ ~ ss E 5g~ j$~' ~ ~ ~ ~ ~ - - £ 5 F ~aY iF 3.+w F E i mfx € ~ 5 ~ 3 - a : @~@ e 33}(Q E S ~ ~ ~ - x are Gt ~ x € € € a E 1 q°' E € Ne .i 6 £WW 9~Y a i 3 r~ 3W 3i 3 9~ ~ ~ v ~ ~ 9 i ~ £ 9Pr - e 9 xy . i P 5 Pr i 5 9 ~r i~ °red t f f 3 S av 0 ~ - ~ x p e E 1 E Fi _ _ mpr f x Rr SF x ~-J~ta'H E~ j4.: - ...E 4 3 t~ @ ~ 3 93# a ~{'~c~] 5 ~ ~ ` E - £ tit *y/ 3 E ~ _ < ~p+ E 4N i ~!a £ e f - 6 e g 6 ~ ~ _ 1 _ ~ ~ , kg z ~ £ ~ £ e z l~£ .gym a ~ £ 8 3 ~.m a 3 i 6 - - F ~ - • ~ va - ~ ~ E a £ x Ill f F _ g( y ~ i beY t 9W 3r¢ ~ ~ ~d e e ~ . ~ ,3,~ x f~.` F F - ,.E E Ili erR _ ~6~ ~ ' l~ 3~ e ' ~ £ xav F x.. : i srP ~ W~aW~rt. e 1 i ,3xE n ~ ~ aYa _ ~ € ~ £ ~ 8 Eli - - z x 8 ~ ~ 1 a x ; £ ~ t[p ~56k f ~ 5E 4 •'i f-. i 5 a :TMw iwm. 3-~ v fi g3. 6_ 8- E. F f £ s e i~£ 4~F 'drt: - rr8va - YW 9 ~ ~.t ~ p 5 5 ~ ' F 9 ~ S Ef x : x ! ~ ~ e~ § £ f € ` i p i ' ~ P 1 ~ € q - 3 9 £ -~W pe~ ~ ~ Iii L~ x. - f - fi E ~ a x F ; ~ E { r~ _ m. ~ - 1 E 3j}. R63A ~.m iI flWA FF bn F i ~ ~ F 3 3 5.emM bN e ~ I ~r P y {f v°r ~ ? i 10 a ~sM '-i 1 { iEiE E ! 4 ~ BAg v - 'I ~ £ !f y i i f \ ~l s~ ' i : E I aY ~ ~ ; ' W ~ , i E ' ~ 0YY [ W1eim 6s..ro~n I. F ~ - L ,4 ~ ar 3 veil li . ~~~www f r q . V J^e _ P~ s z ~ v p £ ~ - 'ner € £w r/r ~ ~ e 1\ a \ 'E~~* - ~ i a t r. 1 f Vim. ~ smi € e ~ s / ~ 9M F i 4 - f / ~ 1 ~ P ~ a 3 , "w l~v , ~ \ 1 ~ fem.. ~ ; £ d!n 9 , J,~ y'y~/ \ i 3 ~ £ ° ~ 3 f x e € s-~ --'3fl? ~ A. \ f.~ i r - 4 .:m.Yi _ e ~,x a ; f Jam, %f ti`'` I . . ~ q S@ffS _ B BP ~ € ...~W~S fit £ ~ 1 ~ € _ 3 - ~ ~~~i _ ~ ~E ~3~+£ .ark 4 E _,u~ 5 l ' { g E IMn 3 '~~"'.a E*_ ~y i ~ ~ ~ ~d ~..3...g E E _ ~_8_.5 i... i - 3 8 € gg [per E . ~ ~ ~ ~ ~ ~ ~ ~ • £ a E~ i... - ~ ~ icmo~ Ea'-.. a -3 - 3~ @ ~ fi 'h B 5 . v ~ fi 9md a ' J'e'w I 5 8. ~ ~ € 4 _ £ - E F M1`v - [ € ~ _ ~ £ ~ EE v£ £~E 3= Ec 1 i 4 ~ gym. } a a ~ sm "fi € ~ E € I ~ s ~ i c .adm _ ~ S _ ~.'~F'. s y _ ~ S ~ ~ _ ~ i ~ ~ _ e g _ i ~ ~ - / s E.. 3€3.,~' a 3 vi a = ww. a sE 9, ~adl~ E aka £ • 'E ~~,~y1 s.~ r"', .'Y e ~ ~ < < . ' _ _ - - 9 t ~i i ~ _ ~ ~ ~ x ftN` 3 a 6M 9 F.:. 6 3 4 3 c FM 3 F~ i i sR£ ~ d £ _ = f ; € 1: ~ i r~.~" l 5 . 4 x J' > ~ f ® u~ . m~ ~ _ _ a~= £ EI - = Y € ~ - ~ i 5~ ~s € s ~ - _ Am a ~ x~~~ ~ ~ - ~ ~ ~ ~ 4 ~ @p ,1 gy ? 3 SEE _ m Ys~ e~ ~ 4AM ....E ~ 1 x EE'55 s~ E E s imw' "!e£ 3as *a~ ' aa9 f { ? a a s Rm sme . € a a asw ~ Gm £ &mn ~ M Sni a a { ~E ~ a @8{ ~ ~ a fi r a c~ . e - - ~~qv e ~ e E m a p~ £ _ m` a E 3 - fF ~ 9 ~ 3 { E.wu F . ~ ?W" ~ E a ~ ,v~ ~ p : # E o ~ P ~ _ ~ 5',~ ~ Aa ` E i a Y I r ? I ~ €a _ bw f7(- ~ ~ ~ E +P ~wv ~ 5 ! a 9m. . 3 _ _ a E a ~ '.v g v I i t y sw's g 3 g ' i p ~ b c'nw~.L~~ 3ww € € e s 4awo ,mME ~ _ i~^ }g§9 £ 4 MR j' a 6~ {9y g a m {py,~' ~w yw . pw yg q[gp . ~ ~ e f S c ~ ~ I§ ~3 c.. £ 3- ? f 1 3 ~ its ~ _ - _ ~ ~ ~ I , . E e~+ 1 6 ~ €bu5i 6 cc € 'c d}~{~ s v E [ c rv-. ~ ..F.. `~Yx gig a ] gay ~ p 8 &Ye iv £ O . ~ G 4f ~ z . ma ~f mmJ . 3 i € _ £ _ _ v € $ 6 ~ C ~ 5 3tl ~ § : . ?eaF Btlm ba - c~ d ~ ~ 8~` .-3. ,~a gip, . S i a S . wr 9 ~ £ i ° ~ s a w ~ vPPv i §eP : °ima• ~ E s : S §~Ey S s ¢ #y~q.~. E i _ v Pmm ~ ~ S* a { [ ~ ' £ ~q gg i j E f ~ I } I F E °dy E E 9P i z - iii [ 3 a i~, 5 3 3 5 : [qu. ym4.- ° a _ - ~gq1 : 3y5 i~ e i ? £ ~ 4 ES i ~i ~ ~ - ? ° is ~ E~ E ~ ~ _ _ , c ~ ~ ~ eft ~ i ~ 5 6 ~ EA Y., s~ g E s c P~.. a ~ -~q g+£ a v ~ 5a}, g. '¢e~M ~ i s ~ € £ c - .v§ - = ~ ~ v ~ tg ' 'iC. fla i...~ ~ 6 'v ~ 3~. iA € 'e= 9'g..~. $ S e v....~ ~ E,a S aaP! a 6 # Aa4 S i v5vm 9rt 444 d~ 3 e 'g $a ~ ° € v i~ v r '~5 v fi qs £ F ~ i ~i 4w - 5 ~E'~ ~ ~i F ~ Ii ~ 3~ E 5 ~ ~s~»£ s -E~ sm E I . s ~ € iwe 3®m # ~ Fa a ® 8 f ~ € i ~EVy € € S E s ~ ~ @ ~ 3 ~ v # 6w S 5 e 3 4 c-~ a $ € rim. ~3 - a € : c p~ ~ z °¢m ~ pE~ ~ {ya4 sa a]~ y E S 8 . 5 3 e 5 a F C j 4 ~+b t[ MW a ~ i iEav 1 ~Sht 6 :e 3 ..r_. € _ a~ E abti ¢rm x q - • € E £ , £ _ - ~ ~ ~ - _ ? b° x a € ~ tqc £ € cc 3 4 ~ cvry F_ k  s d x PLAN IN Q6 i ' s F 91 r & F~ Li I A , L-1 -SCAL 3/4 T 3 _l a 3 C-n 3 r § >..T 3 a per=.`. < s P4 ~ : . COMMUNITY DEVELOPMENT DEPARTMENT Building Permit Number : 16536 BUILDING INSPECTION LINE -(803-234-5935) Date : 1214/2003 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80033 - (303-235-2855) Property Owner: MARK MEDINA Property Address : 4305 NEWLAND ST Phone : Contractor License No. : 21677 Company : GUNNISON ENTERPRISES, INC phone :(303) 332-7208 OWNER/CONTRAC70R SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value : $9,000.00 I hereby ceAify that lhe setback disfances proposed by this permit application are accurete, and Permit Fee : $217.50 do not violate applicable ordinances, rules or regulations of the City of W heat Ridge or $0.00 covenants, easements or restrictions of record; that all measur ments shown, and allegations Plan Review Fee : made are accurate; that I have read and agree to abide nditions printed on this Use Tax : $108.00 application, and that I assume full responsibility for co li ce with the W heat Ridge Building Code (U.B.C.) and all other applicable Wheat Ridg ' ances, for work under this permi Tot81 : $325.50 11 (OWNER)(CONTRACTOR) SIGNED DATE Z ~ O / Use : Descriptian : REMODEL. NEW WINDOWS (11), GUTTERS, BATH (CABINETS, TOILET, TUB, LAV) BUILDING DEPARTMENT USE ONLY SIC : Sq. Ft. : - : , _en~st? Approval : Zoning : INW-MmOs; Approval : ~ ~!11l~Ffftle~l~`" Approval : Occupancy : Walls : Electrical License No : 21781 Company:Wilderness Electric Expiration Date : 2/28I2005 Approval : OKIKS Roof : Stories Plumbing License No :18294 Company : Havens Plumbing, Inc. Expiration Date : 8/31I2005 Approval : OK/KS Residential Units : Mechanical License No Company: Expiration Date : Approval : (1) This pertnit was issued in accoMance with the provisions set forth in yopur application and.is subjad to the laws of the S1ate of Coloratlo and to the Zoning Regulations antl Builtling Cotle of W heat Ridge, Colorado or any other applicable ordinances of the City. (2) This Oertnit shall expire if (A) the vrork authorized is not commenced within sirzty (60) days from issue data or (B) lhe building authorized is suspended or abendonetl (or a period of 120 days. (3) If this permit expires, a new pertnil may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be made in the original plans and specifications and any suspension or abandonment has not exceeded one (t) year. If changes are mada or it suspension or abandonment exceeds one (1) year, full fees shall be paid for a naw permit. (4) No work ot any manner shall be done that will change the natural Flow of water causing a drainage problem. (5) Contrecror shall notiry the Building Inspector twenty-four (24) hours in advanca for all inspeclions and shall receive wntten approval on inspaction card before proceediin h successive phases of ihe job. (e) The: s e~ f a i he approval of drawings antl specifications shall not be construed to be a permit (or, nor an approval of, any violation of the pmwsi of e i des or any other ordinance, law, rule or regulation. ;I/j-w...... Chief Building In ector Please sign Terms and Conditions on reverse side of page. COMMUNITY DEVELOPMENT DEPARTMENT WHEq o' ' p BUILDING INSPECTION LINE - 303-234-593 ^ ° CITY OF WHEAT RIDGE " 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80033 - (303-235-2855) ~oc oRno° ~~~~tcArtoN Building Pemut Number: Date: PropertyOwner: i~~/✓~ ,/~~GGjB<Q~ Property Address: ~v Contractor License No.: ~ Company: Phone: Phane: ONVNER/CONTRACTOR 9CNATURE OF GNDERSTANDING AND AGREEMEN7 I hereby certify that the setback disunces proposcd by lhis permit application are accu2tc, and do not violate applicablc ordinanccs, ivla or rcgulations o(the Ciry of Whcat Ridge or covenanu, wscmcnU or restnctions of rccord; that all mcuurcmenLS shown, and allegations madc arc accurste; that 1 have read and agrcc to abide by all conditions printed on this application and that I assurtx full responvbiliry for compliance with the Wheat 3Gdge Building Code (U.B.C) and all other applicable Whcat Ridge Ordinances, (or work undcr m;s pemit. (pNR:ER)(COMRACTOR} SIGRED DATE (pV.TERpCOMRACCOR) PRI!.TED DATE DESCRIPTION: (~t//yi~(~y{J(l-5 C t~J / C( C ~~r ~L -/M ~AJY~C itll>> ~S i~~ e Z) ~ ZONIN6 COMMENTS: Approval: Zoning: BUILDING DEPARTMENT USE ONLY 13UIlDIN6COMMENTE:'C;V Approval: PUOLIC WORKE COMMEMS: . Approval: Occupancy: ',~'alls: Roo£: Storics: SIC:I --~=5- Sq;Ft._---- Fesiden:ial linits. ~ Zi ~ ~ Electrical Lic5nse ~ Plumbing License No: Mechanical License No: Company: ComPanY: PGUYiN y' ComPany: GJILD~RNfiST~ G(et rC, Expvation Date: Expiration Dace: Expiration Date: Approval: Approval; Approval: (1) This permit v:ss iuued in accord+nce widh the provisiom sn foM in your applicsuon and ic subjai w the hws olth< Suw of Cobrado and w t6e Zoning Regulaoons and Building Codcs of NTnn Wdgc. Cobrado wmy odher aDVlicabk ordinaM'u of thc Ciry. This pmnit shall expirt it(A) Ji< work awhorized is not commrn<ed v.'nhin sury (60) days from issue d"u °r (B) the building authorittd is suspended or .wnaonea ra.. pmoa of 120 mn. (J) It'his pcmiil cnpiru, a new permit may be u9oired tM a keb~< ~ndwimm~ his ~ nd exceedcd mquirtd, yv~- ~chan8e~ luveu`been or f sNmM~s'~a~ or in the miginal plans and specificatinns u~d anY suspe^si°° m aabandonmmt czceeds one (1) ywr. Poll km shall be paid fw a new permii (4) Na wwk of my manncr shall h donc that will chmge Ihe naNnl Ibw of waur nusing a dnimge probkm. (5) ContrKlw shNl mtify ffie BuildinQ Wpeclor twrnry'four (26) hours iv advaMe (ot dl inryec0ons ud sha0 rccen'e rnneo apDm`'al on mspecuon card ydqe yrpcadiny widh successivs phaus of dhe job. (6) The issuance of a pamit w 1he appmnl of Mwings uM specificauons sM1i no1 be conswcd b be a penmil for. nm an +ppmvJ o(. any vio6uon of thc prorisions o t buiWing coda or mY oJhcr ordinantt, law, rvk or regulation. ~ Chief Build' nspector Construction Value:$ %640 Permit Fee:$ Plan Review Fee:$ Use Tax:$ Total:$ ~j~~~i✓~ ~ &I ECE COMMUNITY DEVELOPMENT DEPARTMENT Building Permit Number : 16563 BUILDING INSPECTION LINE -(303-2345953) Date : 12/11I2003 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80033 - (303-235-2855) Property Owner: Jefferson Housing Authority Property Address : 4305 Newland Street Phone : Contractor License No. : 21781 Company : W ilderness Electric Phone : 455-8553 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this pertnit application are accurate, and do not violate applicable ordinances, rules or regulations of lhe City of W heat Ridge or covenanis, easements or reslrictions of record; that all measurements shown, and alle9ations made are accurate; that I have read and agree to abide by all conditions printed on this application, and lhat I assume full responsibility for compliance with the W heat Ridge Building Code (U.B.CJ and all other applicabl ea Re ordes, for work under DAT this pe i~ (OW NER)(CONTRACTOR) SIGNE Description : New service, furnace, outlets, etc. Construction Value : $2,500.00 Permit Fee : $0.00 Use Tax : $0.00 Total: $0.00 Use: BUILDING DEPARTMENT USE ONLY SIC : Sq. Ft. : 2onin~~Gommentx Approval : Zoning : s4ildFni Oamm6rtts; Approval : pyjb I i~'. Work~~'~0{nMliflts:.. Approval : Occupancy : Walls : Roof : Stories : Residential Units : Electrical License No : Company: Expiration Date : Approval : Plumbing License No : Company : Expiration Date : Approval : Mechanical License No : Company : Expiration Date : Approval: (1) This permit was issuad in accordance with the provisions set forth in yopur application and is subject to the laws of the S1ate of Colorado and to lhe Zoning Regulations and Building Code of W heat Ritlge, Colorado or any other applicable ordinances of the Ciry. (2) This permif shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (8) the building authorized is suspended or abandoned for a period of 120 days. (3) If this parmit expires, a new permit may be acquired for a fee of one-half the amount normalty required, provided no changes have 6een or will be made in t a original plans and specifications and any suspension or abandonment has not exceeded one ('I) yeac It changes are made or if suspension or abandonment ezceeds one (7) year, full fees shall be paid tor a new permit. (4) No work of any mannar shall be tlone that will change the natural Flow ot water causing a tlrainage problem. (5) Contractor shall notify the Building Inspector lwenty-four (24) hours in advance for all ins0ections and shall receive written appmval on inspedion card before proceediing with successive phases of the job. (6) The issuance of a permit or t roval of drawings and specifcations shall not be consirued to be a permit for, nor an approval of, any violalion of the provisions of the buildin s ~ inance, law, rule or regulation. Chief Building Inspector Please sign Terms and Conditions on reverse side of page. oF w"E4r COMMUNITY DEVELOPMENT DEPARTMENT BUILDING INSPECTION LINE - (303-2345933) CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE ~~l ORPO~ WHEAT RIDGE, CO 80033 -(303•235•2855) APPLICATION Property Owner. E'a l" ~~S'~ Y C Property Address: ~.''q ~IueJr/v,¢~/ LA"(/ cr Contractor License No.: ~17 g/ u Company: C(/i 4 ll~e- n,1/~ 5S ,F- 1,.-a c~_ K " ~ Building Permit Number: Date: ~ Phane: Pnone:~~3-`~S"S OWNERIGONTRACTOR SIGNA7URE OF UNDERS7ANDING ANDAGREEMENT I hereby cerlify that Me setback distances proposed by this permit application are accurale, and do nol vblate appllpble ordinances, rules or reguWtions of the Cily of Wheal Ridge or covenanis, easements or restriclions of record; that all measu2menLS strown, and allegatbns made are accurate; that I have read arW agree to abide by atl condi6ons printed on Nis applica6on and Nal I assume full responsibiliry for compliance wiN the Wheat Ridge Buiiding Code (U.B.C) and all other applicable Wh t Ridge Ordinances, for work under this permit. DATE (OWNER)(CONTftAC70R): SIGNE p ~ (OWNER)(CONTRACTOR)t PRINTED .~L' 6 , /~lJKKX DATE~ ~ ~c~ ~ GR'~~~ N 112e ZONINGCOMMENTS: Approval: Zoning: COMMENTS: , Approval: Construction Value: $ Permit Fee: $ Plan Review Fee: $ Use Tax: $ I Total Fee: $ ~ l.s~oti~2i A K 114. G, ~ U<-h- ,l SIC: Sq.ft.: Approval: I Occupancy' Walls: RooE Stories, Residential Unils'. Electrical License~ o: Plumbing License No: Mechanical License No: : Company:~M~~G,D`or Company: Company: Expiration Date: Expiretion Date: Expiration Date: Approval: Approvai: Approval: (1) This pemYl w+s inusd N ucordance wIU Ma provbbns sat turfh in Yuir WDlK+tio^ a^4 is subJed la the law, of Ma Stata of ColaaAO md to the Zoning RepulWOns anE Buil0lny Coda of Whsrt R'dqe, Colondo aany aNar appNabN adinmcef of the Clry. (2) Thh parMt shall apln N(A) the work aufhoAZed Is nol canmsn<ed wNhin shty (60) days Irom istue date u(B) the WilEiny auNOriza0ls wspendad aaWndansd for a pariod of 120 Eaya ~b ~o changn h~ve Dsen or will ba mada In the orqinal n) N Mb pamiM azD~, a new pamdt m~Y a kVuirad (a e ise of onsnalf Ne mmount nomwlly requkvd, Drc plano yid spUMcaMOns md any wspauion ar ,bandonment has nol uceedaA ona (1) Ye+r. M chan9as Nve bwi w Hsuspmaian a aDandonmart acwM ona (7) yav, hll ha MY G pald M a naw pemYt. (6) No work d my mannu fhall 6s done Nri will cM1+n9e the naNnl Maw of wrtx uusNq a dninpe problem. (5) ConUacta thW nMNY the Building MpMw Menb4wr (24) houn in adrmce far dl IntDections md shall racNva wrltten spWOwl oa inspaction wd befon proceedinq wXh wuaNw pMSaf ot the job. (6) Tha isswnca oi a paMt a the spWOral of AnwlnBf mO apeciBatlons shail not be <onftrued lo be a pttm@ Iw, nor an apDroval of, any rblation of Ma provlsiona of the buildinq codea m any dhr adin+nu• law, Nle ar rtpulatlon. Chief Building Inspedor FonM iK$ aia.oz.nza pUBLIC SERVICE COMPAI4Y OF COLORADO ' - Q1 ar. 7 noo ~ - a*v r rv }a~a ~cp ~umlr F~ooa op1. ryo ~ ~ ~ J A ''►Y li ~ -~4 'STO N E IPPINiI i ,~OWNGR TENANT~ AGENT~ »ECiFv OTHER[7j I - HAZARD - I CONOITIQN TO BE COflkECTEO FS SHOWN BELOW CPEFTES AN IMMEDIATE HAZpflO. THIS EQOIPMENT MI1ST NOT BE PUT BACK IN SEFVICE IINTIL FEVAIFS ANO A THOFOUGH INSPECTION NAVE BEEN MADE BV A QUALIFlEO CONTPACTOR. CONTACT YOUH LOCAL I BWLOING OEPqRTMEM FOR CODE ANO PEIiM1T FEDUIREMENTS PRIOF TO PERFOFMING FEPAIF WOflK. I NAME AND TVPE OF APPLIFNCE om ~ T /`~'J/l~" R ~I FOR FURTHER INFORMATION, PHONE: ~ J ac~ o ar n ufS/ro~m'ea oc y nni Srcwnlua= ; ; ) ~e oaie _ t~L J~- I. L( GA l lF- / ✓ . . E o v FoAM ai 414-02 -11z3 pUBLIC SERVICE CO NY OF COLORADO ~ U arv , o a aooa v. r~o. CVSipMPINTI OWNER I TENANTEI] AGENT D, sPE~~~ OTHER E] ; - HAZARD - CONOITION TO BE CORRECTEO AS SHOWN BELOW CNEATES AN IMMEDIFTE HAZARO. THIS EOUIPMENT MI15T NOT BE PUT BACK IN ~ SEFYICE IINTIL FEPAIRS ANO q THOFlOl1GH INSPECTION HqVE BEEN MpDE BY A GUALIFlEO CONTRACTOfl. CONiACT YOUA LOCAL BUILDING OEPARTMENT FOA COOE ANO PEFMIT FEOUIREMENTS PRIOF TO PERPORMING FEPAIF WORK. f ' NAME A P PPLIANCE i I C DiTI 0 BE CO ECTED. ✓ d,~✓ I .~s ✓ ,.v ~ ~s J _ ~ t C FOR FURTHER WFORMATION, PHONE: rncceo ar -imr onre .7 . 7 -VS?OM~ CNP4Ni51GNATVH • ! iIME ~D4iC _ ~ _ -DEPARTMENT OF PLANNING AND DEVELOPMENT 1 BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Building Permit Number Date 8174 11 /20/98 Property Owner : Property Address : 4305 NEWLAND ST Phone: 303-423-3025 Contractor License No. : 20086 Company : DAY AND NIGHT EMERGENCY SERV Phone : 972-4270 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restridions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application, and that I assume full responsibility for compliance with the Wheat Ridge Building Code (U.B.C.) and all other applicable Wheat Ridge ordinances, for work under this permrt. (OWNER)(CONTRACTOR) Description : Change furnace BUILDiNG DEPARTMENT USE ONLY SIC : Sq. Ft. : Approval : Zoning : Approvai: Approval : Occupancy : Walls : Roof : Stories : Residential Units : Construction Value : $2,100.00 Permit Fee : $63.00 Plan Review Fee : $0.00 Use Tax : $31.50 Total: $94.50 Use: Electrical License No : Plumbing License No : Mechanical License No : Company : Company: Company : Expiration Date : Expiration Date : Expiration Date : Approval : Approval : Approval : (1) This permit was issued in accordance with the prCo ovisions set forth in yopur applicaiion antl is subject to the laws of the State of Colorado antl to the Zoning Regula0on8 antl Builtling Code of Wheat Ridge, lorado or any other applicable ortlinances of the City. (2) This pennlt shall eacpire iF (A) the work authorized is not commenced within sixry (60) days from issue da[e or (B) the building authorizetl is suspended or abantlonetl for a periotl of'I2o days. (3) I(this permit eupires, a new permd may be acquired for a fee of one-hal! the amount normalry requiretl, provided no changes have been or will 6e made in the onginal plans end speciFlcations and any suspension or abandonment has not exceeded one (1) year. If changes are made or if suspension or abantlonment exceeds one (1) year, full fees shall be paitl for a new permit. (4) No work of any manner shall be done that will change the natural 9ow of waler causing a drainage pro6lem. (5) ConVeClor shall nolify the Buiiding Inspector hvenry-four (24) hours in advance for all inspections and shail receive written approval on inspection card bePore proceediing wIN successive phases of the job. (8) The Issuance of a permit or the approval of drawings and specifcations shall not be construetl to be a permit for, nor an approval of, any violation of the provisions 'of the building cotles or any other ortlinance, law, rule or regulation. THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE Date 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Property Owner: a-iC_K E}oclge-S Property Address :43 0 5 ST L1)heJ'6 agf phone C)3 - 4 a`3 -"3C)aS op 33 ContractorLicenseNo.: $ Company: D~ '~c+ Y\i4%1 51n'2rye~cY S0rV4ce Phone: 3a3-`3Za~~a~a OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value 00 , oa I hereby certihl that the setback disWnces proposed by this permR appiieation are aceurate, PEfrt11t F8C : and do not violate applicable ordinanees, rules or regulations af the Gty of Wheat Ridge or covenants, easements or restridions of record; that all measurements shown, and atleqations made are aecurate; that I have read and a9ree lo abide by all conditions printed on this Use Tax : application, and that I assume full responsi il'Ry for compliance wilh the VJheat Ridge Building Code (U.B.C.) and all other applicable Wh~ -t Ride ordinan~t or work under this pertndr TOt81 : $0.00 . (OWNER)(CONTRACTOR) SIGNED ~DATE' Use: Description : C,No--qJ'l-- BUILDING DEPARTMENT USE ONLY SIC : Sq. FL : Approval: Zoning : Approval : P_U61LtMy623=M9MM Approval : Occupancy : Walts : Roof : Stories : Residential Units : Electrical License No : Company: Plumbing License No : Company: Mechanical License No : Company : Expiration Date : Approval: Expiration Date : Approval: Expiretion Date : Approval: (1) This pefmil was Issued In aaortlance vriM Ihe pmvisions set lonh In yopur application arM is sub'ea to the laws o1 the SUte ol Cokndo and to Ihe Zoninq RegulaGans aM Buildiny Code ot Wheat Ridge, Cob2do a a'ry oNer applinDle atlinances o( ~e Ciry. (2) lTia pemYl slutl ezpre rt(A) Ne work euU~aYZeA bnwl wmmenced wMin suty (60) days from Issue Oate a(B) Ihe builtlinp aulhalzM b suspeiWeO w abandorx.M Iw a peAod a1170 days. (J) II Nis pemiil expires, a new pemul mzy be ecquired la a fee ol ax-hsM tha artaunt namalry required, provide0 no changes hare been or wlll Ee maEe in Ne orpinal pluu anA speaficaGOns an0 arry auspensbn a abanOOnment has not e:ceeded one (1) year. II Uia~pes are rtude or if suapension a sban0aimanl ezceeds one (1) year, lull /eea shall De pald (u a naw pemuL (4) No work o1 any rtunner ahall be done Ihat vnll change ihe naWral Ilow of water rausirp a dninage problem. (S) Contraaor snall noGy the Buildiny Inspectw nvenrydour (24) Iwun in aCVarKe i« an inspections ana shail receive wrinen aDProvaI on InspecUon aM Define - praceediinq wM suaessive phaxa M the lob. (e) The issuance ol a pamwl ar Me approval o(Erawirps and spetlfraUms ahall not Oe conzWed to De a pefmil fa, na an approval ol, airy vblation W the Wevisbna . d Ne EuilEUp mdes a any other adinante, Ww, /ule a repulafion. Chief Building Inspector For Mayor THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION