Loading...
HomeMy WebLinkAbout4730 Otis StreetFrom: no-reolv(alci.wheatridae.m. us To: CommDev Perm is Subject: Online Form Submittal: Foundation Repair Date: Thursday, July 30, 2020 11:24:34 AM Foundation Repair This application is exclusively for FOUNDATION REPAIRS. YOU MUST ATTACH A VALID ELECTRONIC PAYMENT ORM IN ORDER FOR THE PERMIT TO BE PROCESSED. Your Permit will be emailed to the email address provided below once it is processed. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN WORK UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes Foundation Repair? PROPERTY INFORMATION Property Address 4730 Otis Street, Wheat Ridge, CO 80033 Property Owner Name Bowles, Sarah Property Owner Phone Number (enter WITH dashes, eg 303-123- 4567) Property Owner Email Address Attach City of Wheat Ridge Electronic Payment Form - "DO NOT ATTACH A PICTURE OF A CREDIT CARD" 720-837-2724 sarah@chdagent.com Wheat Ridae Payment Form.odf CONTRACTOR INFORMATION Contractor Business Name Wheat Ridge Contractor's License Number (This is a 5 or 6 digit number for the Complete Basement Systems 60125 City of Wheat Ridge) Contractor Phone 720-507-2711 Number (enter WITH dashes, eg 303-123- 4567) Contractor Email cbs.permits@completebasementsystems.net Address Retype Contractor cbs.permits@completebasementsystems.net Email Address DESCRIPTION OF WORK Location of Work Foundation Exterior How is repair being Helical Piers done? Piers, strips, etc. # of Piers or Strips --4- 5 helical piers per plan Upload engineer letter Plans 4730 Otis St.ndf or pages on 8 1/2" x 11" only Repair Plan Set on Field not completed. 11'x17" only - if applicable Project Value (contract 9025 $9,025 Valuation OK value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have Yes been authorized by the legal owner of the property to submit this application and to perform the work described above. Person Applying for Greg Knapp Permit I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Email not displaying correctly? View it in your browser. Main Floor Exterior remove and replace slabs in accordance with owners direction and approval 6 in ZZ/I -11=11 --- - =11 IIII 11=11=111ri111=�1��ll=�llr 11=11111 11 =11 = =11 =11 =1l =11 _Illllrl� II_I�II�II 2 7/8 Helical pier –II –II Bolt brackets to foundation 2- 5/8 dia x 6 inch. Helical Pier see planview for tocattor,� Weld 3/8 in plate to bracket if needed for interior attachment. 8 in –ILII =11 =11 o` ...... Llc� II =11 - av osz .�N _— �:� �z d =11 1111 F1exterior ioCai_ion b ; 28 53 i =11 =11 (optional } s ALo "79� 6 X 6 X 1/4 1N ANGLE a71 CONT. BETWEEN PIERS City of Wheat Ridge Ms Bowles S_l 4730 Otis St. Wheatrid e � nh - Building Division . �,'-�� 'W 1:;"LM Wrt s . � d - . _ Cwmection Helical placement 00 ='=L AAri ENGINEERING AND INSPECTION PLAN OF REPAIR FOR Ms. Sarah Bowles 4730 Otis St. Wheat Ridge, CO 80033 Job # 6968 July 29, 2019 Scott A. Zurn, PE (#28253) 11 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@LEVELIN5PECTION5CO.COM STRUCTURAL GENERAL CONDITIONS Contractor shall maintain comprehensive general liability, workman's compensation, automobile liability and/or other insurance as appropriate for the work performed which will provide protection form any and all construction or completed operations claims. Certificates of Insurance shall be provided to LEVEL ENGINEERING LLC and/or the Client upon request. The limits will not be less than the minimum mandatory amounts required by the State of Colorado. All construction shall be performed in accordance with all applicable codes and standards, and good construction practices. Contractor shall obtain and pay for any and all permit fees, taxes and licenses required by governing agencies to complete the work. Contractor shall be responsible for all labor, materials, equipment, tools, operations and any other item necessary for proper completion of the work. Contractor should visit site prior to bid submittal to fully understand the scope of the project and the conditions at the site. By submitting a bid for the work proposed in this PLAN OF REPAIR, the contractor is implying that they have fully reviewed all associated documents and that they have full understanding of the work to be completed. The Contractor shall conduct a full review of this PLAN OF REPAIR prior to beginning work. If during this review or at any time during the construction process the contractor notes any errors or omissions in the plan, work shall be stopped and LEVEL ENGINEERING LLC shall be contacted immediately. Recommendations and specifications contained herein are based on general assumptions of the conditions, some of which cannot be observed during typical nondestructive visual observations. If unexpected conditions are encountered during the course of work, the Contractor shall contact LEVEL ENGINEERING LLC prior to proceeding. The Client shall provide water and electric hook-ups for temporary use. (Contractor must pre- arrange with Owner.) All utility lines and easements shall be located, marked and protected from damage throughout the performance of the work. Contractor shall call for utility locations unless other arrangements are made. Any damage to utility lines caused by the Contractor shall be repaired at the Contractor's expense. Contractor shall field verify all dimensions and existing conditions prior to commencement of work. Contractor shall notify LEVEL ENGINEERING LLC upon determination of any significant variation of the information provided on the attached documentation for his/her interpretation and decision, and such decision shall be final. Information provided regarding the existing conditions are believed to be accurate, however, Contractor shall be responsible for, and shall only use, his/her own measurements to verify existing conditions. City of 2 1 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@LEVELIN5PECTION5c'% eat Ridge Building Division THE REPAIR DESIGN Prepared by LEVEL Engineering, LLC makes no provisions for construction conditions that may arise during the performance of the work. Contractor shall be responsible for maintaining the stability and integrity of existing structures (bracing, shoring, benching, etc.). Contractor shall be responsible for the acts or omissions of his/her agents and subcontractors in the performance of their work. The Contractor shall be responsible for the means, methods, techniques, and sequences of construction. Existing material or property outside the scope of work that is damaged during construction shall be repaired to match their pre -construction condition at Contractor's expense. Unless noted otherwise, no substitutions or deviations from the repair plan and specifications are permitted without the express approval of LEVEL ENGINEERING LLC. Unauthorized modifications to the repair plan and specifications may deem the work unacceptable. All unacceptable work shall be promptly correct at the Contractor's expense under the direction of the LEVEL ENGINEERING LLC. Contractor shall maintain safe jobsite. The Contractor is to stack all necessary equipment and materials in a low traffic rea or in an area that will insure the safety of all individuals potentially present at this site during construction. OSHA standards shall be used as a guideline. Contractor shall keep the jobsite thoroughly clean at the end of each day. All surplus materials shall be safely stacked in a low traffic area or hauled away from the site. Contractor agrees to perform the work in a diligent manner and in full conformance with the repair plan. If a condition arises during the repair process which requires a change in the scope of work, LEVEL ENGINEERING LLC may submit addendums or modifications to the design which may add, delete or modify the scope of repair. Performance of any extra work, or payment for same, shall only be considered upon prior written authorization from Client. This document is for bid purposes only, The Contractor shall be responsible for utilizing a qualified Colorado Licensed Professional Engineer to inspect the repair work and to verify that the repair specifications described within this document are in compliance with local building codes and applicable Manufacturer standards. The proposal shall include a description of the Contractor's Warranty Terms and Conditions was well as Warranty Limitations. The proposal shall also include a description of the system as applicable. 3 1 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@LEVEUNSPECTIONSCO.CQfVI' Of Wheat Ridge Building Division CONCRETE All concrete shall conform to the most recent editions of the Building Code and ACI 318 adopted by the governing agencies in which the project is to be completed. All concrete shall have a 28 day compressive strength of 3000 psi. All concrete shall have a maximum aggregate size of and no pea -gravel shall be used without written approval of this office. Minimum concrete coverage for steel reinforcement shall be as follows: Concrete cast against and permanently exposed to earth .......................... 3" Concrete cast in forms and exposed to earth or weather No. 6 bar and larger..................................................2" No. 5 bar and smaller ................................................ 1-1/2" Concrete not exposed to weather or in contact with ground .......................1-1 /2" Non -shrink grout shall conform to ASTM C-1107 Care shall be taken to properly consolidate concrete thoroughly without causing segregation of the materials. STEEL REINFORCEMENT All reinforcement steel shall be deformed bars conforming to ASTM A-615, grade 60. Welding of steel reinforcement shall conform to AWS D-1.4. Provide chairs concrete blocks, spacer bars, ties, etc. As required to securely hold bars in place. When reinforcement must be spliced the bars should overlap at least 24', UNO. Overlapping bars shall be securely tied together with wire ties. Provide a minimum concrete cover of 3" where concrete is cast on the surface of the ground and 1-12" at all other locations, UNO. 4 1 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720,408.0119 1 ADMIN@LEVE LINSPECTIONSCO.COM City of Wheat Ridge Building Division STRUCTURAL STEEL AND BOLTS All steel fabrication and installation shall conform to the latest addition of the AISC Manual of Steel Construction. All welding shall be completed by a certified welder using an AWS prequalified welding method in accordance with the requirements specified by the AWS in the structural welding code. E70xx electrodes shall be used for welds. All structural steel shall conform to ASTM A-36, UNO. All wide flange beams shall conform to ASTM A-572, grade 50. All pipe columns shall conform to ASTMA-53, grade B or A-501 All tube steel shall conform to STM A-500, Grade B. Bolts and all -thread shall comply with ASTM A-325 Epoxy for epoxy bolts shall be Hilti Hit HY-150 or approved equal. Expansion bolts shall be Hilti Kwik Bolt III Expansion Anchors or approved equal. 5 � 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720,408.0119 1 ADMIN@LEVE LINSPECTIONSCO.COM City of Wheat Ridge Building Division HELICAL PIERS/SOIL ANCHORS The Helical Pier and concrete contractor shall be fully experienced in all aspects of helical pier installation. SPECIFICATION FOR HELICAL PILE FOUNDATIONS COMPRESSION APPLICATIONS 1 SCOPE 1.1 The work consists of designing, furnishing and installing helical piles and load transfer devices used to support compressive loads according to the project Plans and these specifications. 1.2 The parties and contract terms referred to in this specification are as follows: 1.2.1 The Owner is the person or entity that owns the facility or will own the facility once it is completed. The Owner may have contractual agreements with, and be represented by, other parties such as engineers, architects or contractors that perform services under the direction of the Owner. Where Owner is used in this specification, it refers to the owner or the Owner's contracted representatives separate from the Installing Contractor. 1.2.2 The Pile Designer is the individual or firm generally hired by the Installing Contractor to design the helical piles. 1.2.3 The Installing Contractor installs and tests (if necessary) the helical piles, and possibly performs other tasks associated with the project. 1.2.4 The Plans refer to the contract documents; including but not limited to the drawings and specifications for the project. 1.3 The work may include helical pile load testing. 1.4 The Owner will be responsible for obtaining any right-of-way or easement access permits necessary for the helical pile installation. 1.5 Unless otherwise noted, the Installing Contractor shall provide all labor, tools, equipment and materials necessary to accomplish the work. 1.6 The Owner will provide suitable access to the construction site forthe Installing Contractor's personnel and equipment. 1.7 Unless specifically noted otherwise in the contract documents, the Owner will remove and replace any structures, utilities, pavements, landscaping orother surficial improvements in the work area as necessary to facilitate the work. 1.8 The Owner will be responsible for overall construction oversight to preclude the development of unsafe conditions. 6 1 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@LEVELIN5PECTION5CO.COM City of Wheat Ridge Building Division 1.9 The Owner will be responsible for a horizontal field survey of the helical pile locations prior to helical pile installation and an elevation survey to determine pile shaft cutoff height subsequent to helical pile installation. 1.10 The work does not include any post -construction monitoring of pile performance unless specifically noted otherwise in the contract documents. 2 REFERENCES 2.1 American Institute of Steel Construction (AISC) 2.1.1 AISC 360: Specification for Structural Steel Buildings 2.2 American Society for Testing and Materials (ASTM) 2.2.1 ASTM A36: Carbon Structural Steel 2.2.2 ASTM A123: Zinc (Hot -Dip Galvanized) Coatings on Iron and Steel Products 2.2.3 ASTM A153: Zinc Coating (Hot -Dip) on Iron and Steel Hardware 2.2.4 ASTM A307: Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength 2.2.5 ASTM A325: Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength 2.2.6 ASTM A500: Cold -Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes 2.2.7 ASTM A513: Electric -Resistance Welded Carbon and Alloy Steel Mechanical Tubing 2.2.8 ASTM A572: High -Strength Low -Alloy Columbian -Vanadium StructuralSteel 2.2.9 ASTM B633: Electrodeposited Coatings of Zinc on Iron and Steel 2.2.10 ASTM Dl 143: Deep Foundations Under Static Axial Compressive Load 2.3 International Code Council Evaluation Services (ICC -ES) 2.3.1 Acceptance Criteria 358 (AC358): Acceptance Criteria for Helical Pile Systems and Devices 2.4 Society of Automotive Engineers (SAE) 2.4.1 SAE J429: Mechanical and Material Requirements for Externally Threaded Fasteners 3 DEFINITIONS 3.1 The following terms apply to helical piles used to support compressive loads: 3.1.1 Allowable Stress Design: A structural and geotechnical design methodology that states that the summation of the actual estimated loads (nominal loads) must be less than or equal to the allowable design load (required strength). Allowable loads areobtained by dividing a nominal resistance (strength) by an appropriate factor of safety. 3.1.2 Bearing Stratum: The soil layer (or layers) that provide the helical pile end -bearing capacity through load transfer from the helical plates. 3.1.3 Crowd: Axial compressive force applied to the helical pile shaft as needed during installation to ensure the pile advances at a rate approximately equal to the helix pitch for each revolution. 3.1.4 Design Loads: A generic and ambiguous term used to describe any load used in design. It is not specific to factored or unfactored loads or any particular design 7 1 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@LEVELIN5PECTIONSCO.COM City of Wheat Ridge Building Division methodology. It is a term; therefore, that should be avoided when specifying load requirements. FSI recommends using the term service load, nominal load or factored load, as described herein, where applicable. 3.1.5 Design Strength: A term used in structural design which is defined as the product of the nominal strength and the applicable resistance factor. An equivalent term typically used in geotechnical design is, also sometimes referred to as factored resistance (Load and Resistance Factor Design). 3.1.6 Extension Section: Helical pile shaft sections connected to the lead section or other extension sections to advance the helix plates to the required bearing depth. Plain extensions (without helix plates) or helical extensions (with one or more helix plates) may be used depending upon soil conditions or project requirements. 3.1.7 Factor of Safety: The ratio of the ultimate pile capacity or nominal resistance (strength) to the nominal or service load used in the design of any helical pile component or interface (Allowable Stress Design). 3.1.8 Factored Load: The product of a nominal load and an applicable load factor (Load and Resistance Factor Design). 3.1.9 Factored Resistance: The product of a nominal resistance and an applicable resistance factor (Load and Resistance and Factor Design). 3.1.10 Geotechnical Capacity: The maximum load or the load at as pecified limit state, that can be resisted through the piles interaction with the bearing soils (see also Ultimate Pile Capacity). 3.1.11 Helical Pile: Consists of a central steel shaft with one or more helix -shaped bearing plates and a load transfer device (bracket) that allows attachment to structures. Helical piles are installed into the ground by application of torque and axial compressive force ("crowd"). 3.1.12 Helix (Helical) Plate: Generally round steel plate formed into a helical spiral and welded to the central steel shaft. When rotated in the ground, the helixshape provides thrust along the pile's longitudinal axis thus aiding in pile installation. The plate transfers axial load to the soil through bearing. 3.1.13 Helix Pitch: The distance measured along the axis of the shaft between the leading and trailing edges of the helix plate. 3.1.14 Lead Section: The first helical pile shaft component installed into the soil. It consists of one or more helical plates welded to a central steel shaft. 3.1.15 Limit State: A condition beyond which a helical pile component or interface becomes unfit for service and is judged to no longer be useful for its intended function (serviceability limit state) or to be unsafe (ultimate limit state (strength)). 3.1.16 Load and Resistance Factor Design: A structural and geotechnical design methodology that states that the Factored Resistance (Design Strength) must be greater than or equal to the summation of the applied factored loads. 3.1.17 Load Factor: A factor that accounts for the probability of deviation of the actual load from the predicted nominal load due to variability of material properties, workmanship, type of failure and uncertainty in the prediction of the load (Load and Resistance Factor Design). 3.1.18 Load Test: A process to test the ultimate pile capacity and relation of applied load to pile head settlement by application of a known load on the helical pile head and 8 1 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@LEVELIN5PECTION5CO.COM City of Wheat Ridge Building Division monitoring movement over a specific time period. 3.1.19 Loads: Forces that result from the weight of all building materials, occupants and their possessions, environmental effects, differential movement, and restrained dimensional changes. Permanent loads are those loads in which variations over time are rare or of small magnitude. All other loads are variable loads (see also Nominal Loads). 3.1.20 Mechanical Strength: The maximum load or the load at a specified limit state that can be resisted by the structural elements of a helical pile. 3.1.21 Net Deflection: The total settlement at the pile head minus the theoretical elastic deformation of the pile shaft during a load test. 3.1.22 Nominal Loads: The magnitude of the loads specified, which include dead, live, soil, wind, snow, rain, flood and earthquakes (also referred to as service loads or working loads). 3.1.23 Nominal Resistance: The pile capacity at a specified ultimate limitstate (Load and Resistance Factor Design). See Ultimate Pile Capacity. 3.1.24 Nominal Strength: A term used in structural design which is defined as the structure or member capacity at a specified strength limit state. See Ultimate Pile Capacity. 3.1.25 Resistance Factor: A factor that accounts for the probability of deviation of the actual resistance (strength) from the predicted nominal resistance (strength) due to variability of material properties, workmanship, type of failure and uncertainties in the analysis (Load and Resistance FactorDesign). 3.1.26 Service Loads: See "Nominal Loads" above. 3.1.27 Ultimate Pile Capacity: The helical pile capacity based on the least capacity determined from applicable ultimate limit states for mechanical and geotechnical capacity. 1.1 SCOPE OF WORK The work shall consist of the Helical Pile Contractor furnishing all labor, tools, equipment, materials and supervision to install Helical Piles according to the specifications contained herein and shown on the construction drawings. The Helical Pile Contractor shall install the helical pile which will provide a minimum load capacity of 3,500 ft/lbs. of torque unless indicated otherwise on the construction documents/plans. 1.2 DEFINITIONS Some of the terms used in this specification may be unfamiliar to the reader, or may be used with a specific meaning not commonly known outside the helical pile industry. In determining the meaning of any term used herein, a definition contained in the following list shall take precedence. A. Bearing Sfrafum -The undisturbed soil layer at any pile excavation location which provides a significant portion of the axial resistance of an installed helical pile 9 1 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@LEVELIN5PECTION5CO.COM City of Wheat Ridge Building Division bearing on one or more of the pile helices. B. Confracfor -The person/firm responsible for performing the helical pile work. C. Crowd -Axial compressive force applied to the head (top) of the helical pile shaft during installation as required to ensure the pile progresses into the ground with each revolution a distance approximately equal to the helixpitch. D. Exfension - A pile section without helical plates. Extension(s) are installed after the lead section. Each extension is connected with integral couplings which provide a rigid load transferring connection. Their purpose is to extend the lead section with helical plates to a load bearing stratum. E. Helix Driver - A high torque hydraulic motor used to advance (screw) a helical pile into the soil to a load bearing stratum. Depending on the capacity of the helix driver, it may be either hand held or machine operated. F. Helical Pile - A steel pile consisting of one or more helical plates which is torqued into the soil until the lead section is embedded into a load bearing stratum. They're purpose is to transfer structural loads (tension and/or compression) to a load bearing stratum. G. Helix Plafe - A round plate formed into a ramped spiral. When rotated into the soil, the helical shape provides thrust along its longitudinal axis thus aiding in pile installation. After installation, the plate transfers axial load into the soil through bearing. H. Insfallafion Torque -The resistance generated by a helical pile when installed into the soil. The installation resistance is a function of the strength properties of the soil the helical piles are being installed in as well as the shaft geometry of the pile shaft and helical plates. I. Lead Secfion - The first helical pile section installed into the soil consisting of one or more helix plates welded to the pile shaft. J. Torque Rafing -The maximum torque energy that can be applied to a helical pile during installation into the soil. 1.3 REFERENCES A. American Society of Testing and Materials (ASTM) a. ASTM -A29 Steel Bars, Carbon and Alloy, Hot Wrought and Cold Finished b. ASTM -A36 Structural Carbon Steel c. ASTM -A53 Welded and Seamless Steel Pipe d. ASTM -A500, Grade C, Cold Formed Welded and Seamless CarbonSteel Structural Tubing in Rounds and Shapes e. ASTM -A307 Carbon Steel bolts and Studs f. ASTM -563 Carbon and Alloy Steel Nuts B. American Welding Society (AWS) 10 1 320 N. CLEVELAND AVENUE, LOVE LAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@ LEVELINSPECTIONSCO.COMCity Of Wheat Ridge Building Division a. AWS DI. I Structural Welding Code -Steel C. Society of Automotive Engineers (SAE) a. SAE J429 Mechanical and Material Requirements for Externally Threaded Fasteners D. International Code Council - Evaluation Services (ICC -ES) a. Acceptance Criteria for Corrosion Protection of Steel Foundation Systems Using Polymer (EAA) Coatings (AC228) b. Acceptance Criteria for Helical Pile Systems and Devices (AC358) c. Evaluation Service Report (ESR) E. International Organization for Standardization (ISO) a. ISO 9001:2008 -Quality Management System 1.4 SUBMITTALS A. Five (5) sets of site-specific shop drawings sealed by a registered professional engineer. Shop drawings to include: a. Helical pile/anchor identification number and location b. Helical pile/anchor design load c. Type and size of helical pile/anchor shaft d. Helical configuration (number and diameter of helical plates) e. Minimum effective torque required f. Connection details B. Copies of certified calibration reports for all hydraulic gages. The calibrations shall have been performed within one (1) year of the proposed starting date of the pile installation. C. Provide steel manufacturer's mill test reports, covering physical and chemical tests, for all steel piles. D. Provide strength and properties sections of pile sections and calculations by a Professional Engineer demonstrating the pile will meet or exceed the strength requirements of the design loads as shown on the construction documents. a. If applicable, the calculation(s) shall include the load eccentricity on the pile. The eccentricity shall be measured from the vertical face of the footing tothe center of the pile shaft. If the helical pile is deemed laterally unbraced per section 1808.2.5 of the International Building Code (IBC), the allowable load capacity calculation (s) of the pile shall take into consideration the unbraced length of the pile per section 1808.2.9.2 of the International Building Code (IBC). E. Installation Records: Within 7 days after pile installation, submit 2 copies of the installation record for each pile installed. 111 320 N. CLEVELAND AVENUE, LOVE LAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@ LEVELINSPECTIONSCO.COM City Of Wheat Ridge Building Division The installation record shall clearly indicate the pile identification number or mark, pile diameter, helix configuration, installation depth, installation torque, ultimate and allowable capacity of pile. b. Where helical piles are being installed on existing structures provide final lifting force/design load applied to pile, the amount of elevation recovery of each pile. 1.5 QUALITY ASSURANCE A. The Contractor performing the Work of this Section shall have been regularly engaged in pile work for a period of not less than 5 years and shall be properly equipped to execute the Work. If directed, furnish a list of projects of a similar type and magnitude executed by the Contractor. B. In lieu of the Contractor achieving 5 years of Helical Pile experience, a certificate of competency can be provided by manufacturer. The certificate should state that the Contractor has been trained and is authorized to install the underpinning pile system or the manufacturer shall provide a letter expressing the ability and intent to provide on-site supervision of the pile installation. C. Design of the helical piles/anchors shall be performed by a professional engineer licensed in the state of the project in accordance with existing building code requirements. D. The helical pile shall be recognized by the International Code Council (ICC) and the manufacturer shall hold a current ICC -ES issued ESR report showing compliance with AC358 and the current International Building Code (IBC). E. The manufacturer shall have been issued an International Organization for Standardization - (ISO) 9001:2008 - Quality Management System Certificate and be compliant. 1.6 DELIVERY, STORAGE, AND HANDLING A. Transport, store, and handle piles in a manner to prevent damage to the piles. Piles shall be stored above the ground surface by pallets, blocking or other means. 12 1 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@LEVELINSPECTIONSCO.COM City of Wheat Ridge Building Division PART 2 PRODUCTS 2.1 MATERIAL A. Manufacturer: Grip-Tife Manufacfuring Company, LLC 115 W. Jefferson Sf. Winfersef, Iowa 50273 Tel: (515) 462-1313; Fax: (515) 462-3465 www.gripfife.com See affached Grip-Tife Evaluafion Reporf for full specifications. Nofe: Equivalent systems may be substituted. System equivalence will be determined by comparing a manufacturer's current ICC -ES issued ESR report to ESR -1854. B. The helical piles/anchors shall have a central shaft that is cold formed welded and seamless carbon steel structural round tubing with a minimum yield strength of 65 ksi and meeting the dimensional and workmanship requirements of ASTM A500 as well as the following properties: 2 7/8" diameter piling/anchor: Torsional strength rating = 8,000 ft -lbs Ultimate resistance capacity = 72,000 lbs a. Shall conform to ASTM A-36 and have minimum yield strength (FY) of 50 ksi. b. Shall have a minimum thickness of 3/8". C. All other flat plate steel shall conform to ASTM A-36 unless noted otherwise on the plans. D. All coupling connection thru bolts shall be 1/4" diameter and conform to SAE J429 Grade 8 or equivalent. (minimum yield strength (FY) = 130 ksi and minimum tensile strength (F„) = 150 ksi) E. All piling sections and brackets shall be coated with a polymer alloy thermoplastic powder coating, Plascoat PPA 571 ES or equal, in compliancewith ICC -ES acceptance criteria AC228 for corrosion resistance. 2.2 PERFORMANCE REQUIREMENTS A. All helical piles shall be designed to support the design load(s) as shown on the plans. 13 1 320 N. CLEVELAND AVENUE, LOVE LAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@ LEVELINSPECTIONSCO.COPQity of Wheat Ridge Building Division B. Except where noted on the plans, all helical pile components shall be selected to provide a minimum factor of safety against ultimate mechanical failure of two (2). C. The helical pile design shall take into account pile spacing, soil stratification and strain compatibility issues as are present for the project. See drawings for reference for the project geotechnical report. A copy of the project geotechnical report shall be provided to and reviewed by the Pile Contractor prior to bid submittal. D. Where helical piles are subjected to lateral or base shear loads as indicated on the plans, the bending moment and stress from said loads shall be determined using a lateral load analysis program such as LPILE or equal commercially available software. The required soil parameters (c, 0, y and ks) for use with LPILE or equal shall be provided in the geotechnical report(s). The allowable lateral deflection of the helical pile shall be limited to one (1 ") inch unless noted otherwise on the plans. E. The helical pile bracket shall distribute the design load(s), as indicated on the plans, to the concrete foundation such that the concrete bearing stress does not exceed those in the ACI Building Code and the stress in the steel plate/welds do not exceed AISI allowable stresses for steel members. Helical piles shall be designed by a licensed professional engineer in accordance with the current International Building Code (IBC) adopted by the local jurisdiction. PART 3 EXECUTION 3.1 PREPARATION A. Before entering the construction site to begin work, the Helical Pile Contractor shall provide proof of insurance coverage as stated in the general specification and/or the contract. B. The Helical Pile Contractor shall request markings of underground utilities by an underground utility location service. All efforts shall be made to protect any underground utilities encountered during the excavation and pile installation. Any separations or damage caused to the underground utilities shall be repaired/performed by a licensed professional. C. Mark all pile installation locations as shown on the plans or approved shop drawings. The Engineer of Record shall be notified if the piles are relocated more than 12" from the locations shown on the plans or approved shop drawings. Relocation of the piles will not be allowed unless approved by the Engineer of Record. D. A torque indicator shall be used during helical pile/anchor installation. The torque indicator can be an integral part of the installation system or externally mounted in-line. 14 1 320 N. CLEVELAND AVENUE, LOVE LAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@ LEVELINSPECTIONSCO.COMCity of Wheat Ridge Building Division E. A third party inspector shall be retained to oversee all aspects of installation of the helical piles/anchors. The items to be inspected include, but not limited to the following: a. Verify the type of helical pile/anchor being installed is as specified on the shop drawings. b. Verify final embedment depth of helical pile/anchor. c. Verify final installation torque readings as specified on the shop drawings. 3.2 INSTALLATION A. Installation torque serves as empirical verification of pier capacity yielding an onsite load fest for each pier. Therefore, soils testing is not necessary for generating a theoretical capacity. B. The lead section shall be positioned at the location as shown on the construction drawings. Battered helical piles/anchors can be positioned perpendicular to the ground to assist in initial advancement into the soil before the required battered angle shall be established. C. The helical pile/anchor sections shall be engaged and advanced into the soil in a smooth, continuous manner at a rate of rotation of 5 to 25 RPMs. Extension sections shall be provided to obtain the required minimum overall length and installation torque as shown on the construction drawings. Connect sections together using coupling bot(s) and nut torqued to snug tight perAISC. D. Sufficient down pressure shall be applied to uniformly advance the helical pile/anchor sections approximately 3 -inches per revolution. The rate of down pressure (crowd) shall be adjusted for different soil conditions and depths. E. The minimum installation torque and minimum overall length criteria as shown on the construction drawings shall be satisfied prior to terminating the helical pile/anchor installation. F. If the torsional strength rating of the pile shaft and/or installation equipment has been reached prior to achieving the minimum overall length required, the Contractor shall have the following options: a. Terminate the installation depth obtained subject to the review and acceptance of the Engineer of Record, or: b. Remove the existing helical pile/anchor and install a new one with fewer and/or smaller diameter helix plates. The new helix plate configuration shall be subject to review and acceptance of the Engineer of Record. If re -installing in the same location, the top -most helix of the new helical pile/anchor shall be terminated at least three feet (3'-0) beyond the terminating depth of the original helical pile/anchor. G. If the minimum installation torque as shown on the working drawings is not 15 1 320 N. CLEVELAND AVENUE, LOVE LAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@ LEVELINSPECTIONSCO.CONfity of Wheat Ridge Building Division achieved at the minimum overall length and there is no maximum length constraint, the Contractor shall have the following options: Install the helical pile/anchor deeper using additional extension sections, or: Remove the existing helical pile/anchor and install a new one with additional and/or larger diameter helix plates. The new helix plate configuration shall be subject to review and acceptance of the Engineer of Record. If re -installing in the same location, the top -most helix of the new helical pile/anchor shall be terminated at least three feet (3'-0) beyond the terminating depth of the original helical pile/anchor. c. De -rate the load capacity of the helix pile/anchor and install additional helical piles/anchors. The de -rated capacity and additional helical piles/anchors location shall be subject to the review and acceptance of the Engineer of Record. H. If the helical pile/anchor is refused or deflected by a subsurface obstruction,the installation shall be terminated and the pile/anchor removed. The obstruction shall be removed, if feasible, and the helical pile/anchor re -installed. If the obstruction can't be removed, the helical pile/anchor shall be installed at an adjacent location, subject to the review and acceptance of the Engineer of Record. The Contractor shall conduct his construction operations in a manner to insure the safety of persons and property in the vicinity of the work. The Contractor's personnel shall comply with safety procedures in accordance with OSHA standards and any established project safety plan. J. The portion of the construction site occupied by the Helical Pile Contractor, his equipment and his material stockpiles shall be kept reasonably clean and orderly. 3.3 FIELD QUALITY CONTROL A. The Helical Pile Contractor shall furnish and install all helical piles per the plans and approved pile design documentation. In the event of conflict between the plans and approved pile design documentation, the contractor shall not begin construction on any affected items until such conflict has been resolved. B. Centerline of helical piles/anchors shall not be more than three inches (3") from indicated plan location unless approved by the Engineer of Record. C. Helical pile/anchor plumbness shall be within 2 degrees of the design alignment. 3.4 CLEAN UP A. Within seven (7) days of completion of the work. The Helical Pile Contractor shall remove any and all material, equipment, tools, building materials, concrete forms, 16 1 320 N. CLEVELAND AVENUE, LOVE LAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@ LEVELINSPECTIONSCO.COMCitY Of Wheat Ridge Building Division debris or other items belonging to the Contractor or used under the Contractor's direction. END OF SPECIFICATION QUALIFICATIONS OF INSTALLING CONTRACTOR AND DESIGNER 4.1 The Installing Contractor and/or Pile Designer shall submit to the Owner, a proposal including the documentation required in this Section. Work shall not begin until all the submittals have been received and approved by the Owner. All costs associated with incomplete or unacceptable submittals shall be the responsibility of the Installing Contractor. 4.2 Evidence of Installing Contractor's competence in theinstallation of helical piles shall be provided to the Owner's satisfaction and may include any or all of the following: 4.2.1 Pile manufacturer's certificate of competency for the installation of helical piles, 4.2.2 A list of at least three projects completed within the previous three years whereinthe Installing Contractor installed helical piles similar to those shown in the project Plans. Such list to include names and phone numbers of those project representatives who can verify the Installing Contractor's participation in those projects, and/or 4.2.3 A letter from the pile manufacturer or manufacturer's representative expressing ability and intent to provide on-site supervision of the pile installation. 4.3 A listing of all safety violations lodged against the Installing Contractor within the previous three years and the current status or final resolutions thereof. Descriptions of safety improvements instituted within the previous three years may also be submitted, at the Installing Contractor's discretion. 4.4 Evidence of Pile Designer's competence shall be provided to the Owner's satisfaction and may include any or all of the following: 4.4.1 Registration as a Professional Engineer or recognition by the localjurisdictional authority, 4.4.2 A list of at least three projects completed within the previous three years wherein the Pile Designer designed helical piles similar to those shown in the project Plans. The list shall include names and phone numbers of those project representatives who can verify the Pile Designer's participation in those projects, and/or 4.4.3 Recommendation from the pile manufacturer or manufacturer's representative. PRE -CONSTRUCTION SUBMITTALS 5.1 Within 2 weeks of receiving the contract award, the Installing Contractor and/or Pile Designer shall submit the following helical pile design documentation: 5.1.1 Certification from the Pile Designer that the proposed piles meet the requirements of City of 17 1 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@LEVELINSPECTIONSCO.COM Wheat Ridge Building Division this specification. 5.1.2 Qualifications of the Installing Contractor and Pile Designer per Section8. 5.1.3 Product designations for helical lead and extension sections and all ancillary products to be supplied at each helical pile location. 5.1.4 Individual pile nominal loads, factors of safety, _RFD load and resistance factors and required ultimate torque correlated capacities, where applicable. 5.1.5 Individual pile loading requirements (if any). 5.1.6 Manufacturer's published allowable system capacities for the proposed pile assemblies, including load transfer devices. 5.1.7 Calculated mechanical and theoretical geotechnical capacities of the proposed piles. 5.1.8 Minimum pile termination torque requirements. 5.1.9 Maximum estimated installation torque and allowable installation torque rating of the proposed piles. 5.1.10 Minimum and/or maximum embedment lengths or other site-specific embedment depth requirements as may be appropriate for the site soil profiles. 5.1.11 Inclination angle and location tolerance requirements. 5.1.12 Load test procedures and failure criteria, if applicable. 5.1.13 Copies of certified calibration reports for torque measuring equipment and load test measuring equipment to be used on the project. The calibrations shall have been performedwithin one year of the proposed helical pile installation starting date or as recommended by the equipment manufacturer. 5.1.14 Provide proof of insurance coverage as stated in the general specifications and/or contract. City of 18 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@LEVELINSPECTIONSCO.COM Wheat Ridge Building Division 6 PLACEMENT REQUIREMENTS 6 Helical piles shall be installed within 3 -inches of the indicated plan location. 6.1 Helical pile shaft alignment shall be within 2 -degrees of the inclination angle shown on the Plans. 6.2 Top elevation of the helical piles shall be within 2 -inches of the design vertical elevation. 7 PILE/PIER INSTALLATION 7.1 Installing Contractor shall furnish and install all helical piles per the project Plans and approved pile design documentation. In the event of conflict between the project Plans and the approved pile design documentation, the Installing Contractor shall not begin construction on any affected items until such conflict has been resolved. 7.2 The Installing Contractor shall conduct their construction operations in a manner to insure the safety of persons and property in the vicinity of the work. The Installing Contractor's personnel shall comply with safety procedures in accordance with OSHA standards and any established project safety plan. 7.3 The Owner shall request marking of underground utilities by an underground utility location service as required by law, and the Installing Contractor shall avoid contact with all marked underground facilities. 7.4 The portion of the construction site occupied by the Installing Contractor, including equipment and material stockpiles shall be kept reasonably clean and orderly. 7.5 Installation of helical piles may be observed by representatives of the Owner for quality assurance purposes. The Installing Contactor shall give the Owner at least 24 hours' notice prior to the pile installation operations. 7.6 The helical pile installation technique shall be such that it is consistent with the geotechnical, logistical, environmental, and load carrying conditions of the project. The lead section shall be positioned at the appropriate site survey stake location as determined from the plan drawings. 7.7 The helical pile sections shall be advanced into the soil in a continuous manner at a rate of rotation less than 25 revolutions per minute (rpm). Sufficient crowd shall be applied to advance the helical pile sections at a rate approximately equal to the pitch of the helix plate per revolution. The rate of rotation and magnitude of down pressure shall be adjusted for different soil conditions and depths. Extension sections shall be provided to obtain the required minimum overall length and minimum torsional resistance as shown on the project Plans. I City of 19 1 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@LEVELINSPECTI° D -SONidge Building Division TERMINATION CRITERIA 8.1 The minimum final torsional resistance and/or any required pile length and embedment depth criteria, as specified in the Pre -Construction Submittals, must be satisfied prior to terminating the pile installation. In the event an helical pile fails to meet these production quality control termination criteria, the following remedies may be suitable if authorized by the Owner: 8.1.1 If the installation fails to meet the minimum torsional resistance criterion at the minimum embedment length: 8.1.1.1 Continue the installation to greater depths until the torsional resistance criterion is met, provided that, if a maximum length constraint is applicable, continued installation does not exceed said maximum length constraint, or 8.1.1.2 Demonstrate acceptable pile performance through pile load testing, or 8.1.1.3 Replace the pile with one having a different helix plate configuration. The replacement pile must not exceed any applicable maximum embedment length criteria and either: (A) be embedded to a length that places the last helix plate at least equal to its own diameter beyond the depth of the first helix plate of the replaced pile and meet the minimum torsional resistance criterion; or (B) pass pile load testing criteria. 8.1.2 If the torsional resistance during installation reaches the helical pile's allowable torque rating prior to satisfaction of the minimum embedment length criterion: 8.1.2.1 Terminate the installation at the depth obtained, or 8.1.2.2 Replace the pile with one having a shaft with a higher torsional strength rating. The replacement pile must be installed to satisfy the minimum embedment length criterion. It must also be embedded to a length that places the last helix plate at least equal to its own diameter beyond the depth of the first helix plate of the replaced pile without exceeding any applicable maximum embedment length requirements and it must meet the minimum final torsional resistance criterion, or 8.1.2.3 Replace the pile with one having a different helix plate configuration. The replacement pile must be installed to satisfy the minimum embedment length criterion. It must also be embedded to a length that places the last helix plate at least equal to its own diameter beyond the depth of the first helix plate of the replaced pile without exceeding any applicable maximum embedment length requirements, and it must meet the minimum final torsional resistance criterion. 8.1.3 If the installation reaches a specified maximum embedment length without achieving the minimum torsional resistance criterion: 8.1.3.1 If allowed, remove and reinstall the pile at a position at least three times the diameter of the largest helix plate away from the initial location. Original embedment length and torsional resistance criteria must be met. The pile repositioning may require the City of 20 1 320 N. CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@LEVELINSPECTIONSCO.COM Wheat Ridge Building Division installation of additional helical piles with nominal loads adjusted for these spacing changes, or 8.1.3.2 Demonstrate acceptable pile performance through pile load testing, or 8.1.3.3 De -rate the load capacity of the helical pile based on default or site-specific torque correlation factors and install additional piles as necessary. 8.1.3.4 Replace the pile with one having a different helix plate configuration. The replacement pile must be installed to satisfy the minimum and/or maximum embedment length criterion and it must meet the minimum final torsional resistance criterion. 8.1.4 If a helical pile fails to meet the acceptance criteria in a pile loadtest: 8.1.4.1 Install the pile to a greater depth and installation torque and re- test; provided that, if a maximum embedment length constraint is applicable, continued installation will not exceed said maximum length constraint, or 8.1.4.2 Replace the pile with one having more and/or larger helix plates. The replacement pile must be embedded to a length that places the last helix plate at equal to its own diameter beyond the depth of the first helix plate of the replaced pile without exceeding any applicable maximum embedment length requirements. The replacement pile must be re -tested, or, 8.1.4.3 De -rate the load capacity of the helical pile based on the results of the load test and install additional piles. Additional piles must be installed at positions that are at least three times the diameter of the largest helix plate away from any other pile locations. 8.1.5 If a helical pile fails a production quality control criterion as described in this Section or for any reason other than described in this Section, any proposed remedy must be approved by the Owner prior to initiating its implementation at the projectsite. 9 INSTALLATION RECORD SUBMITTALS 9.1 The Installing Contractor shall provide the Owner copies of the individual helical pile installation records within 24 hours after each installation is completed. Formal copies shall be submitted within 30 days following the completion of the helical pile installation. These installation records shall include, but are not limited to, the following information: 9.1.1 Date and time of installation 9.1.2 Location of helical pile and pile identification number 9.1.3 Installed helical pile model and configuration 9.1.4 Termination depth, pile head depth, and length of installed pile 9.1.5 Actual inclination of the pile 211 320 CLEVELAND AVENUE, LOVE LAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@ LEVELIN5PECTIONSCO.CONt`ity of Wheat Ridge Building Division 9.1.6 Final torsional resistance 9.1.7 Calculated geotechnical capacity based on final torsional resistance 9.1.8 Comments pertaining to interruptions, obstructions, or other relevantinformation 10 FIELD COMPRESSION LOAD TESTING 10.1 If field compression load testing is required, the Installing Contractor shall furnish all labor, equipment and pre -production helical piles necessary to accomplish the testing as shown in the approved pile design documentation. Installing Contractor shall apply the specified loads for the specified durations and record the specified data, for the specified number of piles. No deviations from the test plan (s) will be allowed without explicit approval in writing from the Owner. Pile testing shall be in general accordance with the ASTM D1 143 quick test method and the following criteria: 10.1.1 Failure criteria shall be in accordance with AC358 and is when plunging occurs or when the net deflection exceeds 10% of the average helix plate diameter, whichever occurs first. 10.1.2 An alignment load equal to 5% of the anticipated failure load or maximum anticipated test load may be applied prior to the start of the test to take out slack in the load test frame. 10.1.3 Loading increments shall be performed at 5% of the anticipated failure load or maximum anticipated test load with a minimum hold time of 4 minutes at each increment. 10.1.4 Upon completion of the maximum test load hold increment, the pile shall be unloaded in 5 to 10 even increments with minimum hold times of 4 minutes at each increment. 10.2 Installing Contractor shall provide the Owner copies of raw field test data within 24 hours after the completion of each load test. Formal test reports shall be submitted within 30 days following test completion. Formal test reports shall include the following information: 10.2.1 Name of project and Installing Contractor's representative (s) present duringload testing. 10.2.2 Name of manufacturer's representative (s) present during load testing, ifany. 10.2.3 Name of third -party test agency and personnel present during load testing, if any. 10.2.4 Date, time, duration and type of the load test. 10.2.5 Unique test identifier and map showing the test pile location. 10.2.6 Pile model and installation information including shaft type, helix configuration, lead and extension section quantities and lengths, final pile tip depth, installation date, total test pile length and final termination torque. 10.2.7 Calibration records for applicable pile installation and test equipment. 10.2.8 Tabulated test results including cumulative pile head movement, loading increments and hold times. 10.2.9 Plots showing load versus deflection for each loading/unloading interval. 22 1 320 CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADM IN[ a LEVELIN5PECTION5CO.CgM Of Wheat Ridge Building Division LIMITATIONS This repair design does not represent a complete analysis of the entire structure; it addresses conditions covered under the structural warranty provided by the contractor. The interpretations of the distress to be repaired are based on the visual observations of the structure. No detailed study was made of the structural elements of any part of the building. Therefore, no opinion is presented or shall be implied concerning the structural integrity of those elements not subject to visual inspection. Investigation and analysis of other portions of the structure are beyond the scope of this design at this time. LEVEL Engineering, LLC will not be responsible for 1) knowledge of subsurface conditions away from the existing borings, if any, without extensive geotechnical information supplied by a competent geotechnical engineer, 2) knowledge of distresses, or differential displacements that have occurred in an area which had not been exposed for visual observation during our site visit and 3) any other elements such as joists or beams and other structural members that are not readily visible. LEVEL Engineering, LLC assumes that all information provided by the Client, Contractor, or other Consultants is correct, accurate, and may be acted upon accordingly, and shall have no liability for the validity of information provided. LEVEL Engineering, LLC shall have no liability for acts or omissions of the Contractor or any other agents performing the work on this project or for the failure of the Contractor to carry out the work in accordance with the plans and specifications if not inspect as intended. LEVEL Engineering, LLC shall not be responsible for the construction means, methods, techniques, sequence, procedures, or safety precautions related to this project and its execution that is under the control or direction of the Contractor. This PLAN OF REPAIR is to be used with the accompanying drawings. Do not rely on one or the other, all materials contained in THE PLAN OF REPAIR including but not limited to the cover letter, notes, plans, details, shall be used together to perform the proposed remedial construction. WORK DESCRIPTION For the purposes of this report, the front of the home is considered to face Wast. The structure of the single -story single-family home is a conventionally framed residence. The home has a slab on grade foundation the foundation system consists of reinforced concrete slab on grade with turned down stem walls on the perimeter and an integrated slab. The work areas are the northwestern corner foundation stem walls. The repairs shall consist of installing Helical piers to reduce foundation movement and further reduce cracking of the walls. Once complete if the owner wishes to seal cracks in the exposed foundation wall areas with epoxy injection it will be at the direction of the owner. 23 1 320 CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN[ @LEVELIN5PECTION5co.co "'City Of Wheat Ridge Building Division Areas of the exterior of the foundation structure is settling. These issues are causing faulting and fracturing of the slabs, exterior and interior finishes, and unevenness of the roof and floor structures. Helical underpinning is part of this work. This area of repair is referenced in the attached drawings. (see plan). Once the piles are installed. All restoration of finishes exterior and interior flatwork shall be restored in kind and in accordance with the owner's approval. The contractor is responsible for coordinating these type of repair scopes with the contractor. The contractor is required to coordinate these expectations with the owner and include the necessary work items in their bid proposals. REPAIR RECOMMENDATIONS 1. The concrete slab and walls are to be braced as required during the repair process by the Contractor. 2. Remove decks, pavers, slabs etc. to excavate the soil required to install the new helical foundation devices, in accordance with drawings prepared by Level Engineering LLC. Coordinate location of piers with owner prior to proceeding. 3. Excavate the soil required to install the helical piers and anchors in accordance with drawings prepared by Level Engineering LLC. 4. Install 5 helical piles/piers to a depth of 25 ft. and 3500lbs/sf torque. Coordinate location with engineer per Grip -cite specifications and recommendations and drawings including specifications prepared by Level Engineering LLC. 5. With the piers install continuous 6 x 6 angle iron between pier brackets to assure continuous support of grade beam. 6. Restore all finishes exterior and interior in accordance with agreements with owner. PROPOSED COMPLIANCE OBSERVATIONS All observations shall be conducted by a qualified Colorado Licensed Professional Engineer. More than one observation may be conducted during a site visit. The contractor is to determine the number of site visits required to do the observations and include this information in the bid documents. LEVEL Engineering, LLC is willing to complete the observation under contract. 1. Pre -Construction Meeting 2. Attachment of brackets to foundation walls. 3. load tests 4. Epoxy Injection of foundation wall cracks (directed by owner) 5. Review pier logs 6. Final rite of 24 1 320 CLEVELAND AVENUE, LOVELAND CO 80537 1 MAIN: 720.408.0119 1 ADMIN@LEVELIN5PECTION5CO.COM Wheat Ridge Building Division U E $ EVALUATION REPORT Nu�i,_ Oriainally Issued: 0 410 112 01 6 Revised: 04/3012020 Grip-Tite® Manufacturing Company, LLC 115 W. Jefferson Street Winterset, Iowa 50273 Tel (515) 462-1313 Fax (515) 462-3465 Steve(a )gri pti te.com K 1% 11.griptite.cum Grip-Titem Helical Pile Foundation System CSI Section: 3163 00 Bored Piles 1.0 RECOGNITION Grip-Tite® Helical Pile Foundation System, manufactured by Grip-Tite® Manufacturing Company, LLC, was evaluated for use to underpin or stabilize existing structures and for use in new construction in place of micropiles and/or other deep foundation systems. The building structural loads are transmitted axially through the system, either in compression or in tension, to bearing soils via the system helices. The structural and geotechnical properties of the Helical Pile Foundation System were evaluated for compliance with the following codes: 2018, 2015, 2012 and 2009 International Building Code® (IBC) The Grip-Tite' Helical Pile Foundation System complies as helical piles in accordance with Section 1810.3.1.5 of the IBC. 2.0 LIMITATIONS Use of the Grip-Tite® Helical Pile Foundation System recognized in this report is subject to the following limitations: 2.1 The helical pile foundations shall be analyzed, designed, detailed, and installed as required by IBC Sections 1808 and 1810. Designs shall be prepared by a qualified design professional and submitted to the building official for approval. Analysis shall be in accordance with IBC Section 1604.4 and shall include a geotechnical investigation, if necessary, as set forth in IBC Section 1803. The design method shall be Allowable Stress Design (ASD) using the load combinations in IBC Section 1605.3, except that allowable stresses are not permitted to be increased as permitted by the material chapter of the code or referenced standards. 391 Valid Through: 04/30/2021 2.2 The spacing between helical plates shall not be less than 3D, where D is the diameter of the largest helical plate measured from the edge of the helical plate to the edge of the adjacent helical pile plate, or 4D, where the spacing is measured from the center to the center of the adjacent helical pile plates. Group efficiency effects shall be included in the analysis where the center -to -center spacing of axially loaded helical piles is less than three times the diameter of the largest helix plate at the depth of bearing, and where the center -to -center spacing of laterally loaded helical piles is less than eight times the least lateral dimension of the pile shaft at the ground surface. 2.3 The systems shall be limited to support of structures in IBC Seismic Design Categories A, B and C only. Use of the systems to support structures located in Seismic Design Categories D, E, and F, or located in Site Class E or F, is outside the scope of this report. Compliance with the provisions of IBC Section 1810.3.11.1 has not been verified and shall be determined by the designer for each installation. 2.4 Connection of the Grip-Tite® Helical Pile Foundation System to the supported structure shall be designed by a registered design professional. Use of the system to support concrete structures shall be limited to support of untracked concrete. 2.5 The piles shall be laterally braced for stability as required by IBC Section 1810.2.2. 2.6 Settlement of the helical pile shall be determined by a registered design professional as required by IBC Section 1810.2.3. 2.7 The systems shall not be used in conditions that are indicative of a potential pile corrosion situation as defined by soil resistivity less than 1,000 ohm -em, pH less than 5.5, soils with high organic content, sulfate concentrations greater than 1,000 ppm, landfills, or mine waste. Materials with different corrosion protection coatings shall not be combined in the same system. Systems shall not be placed in electrical contact with (shall be galvanically isolated from) structural steel, reinforcing steel, or any other metal building components. 2.8 Installation of the helical piles is subject to special inspection as required by 2018, 2015, and 2012 IBC Section 1705.9 or 2009 IBC Sections 1704.10. 3.0 PRODUCT USE INSTRUCTIONS The manufacturer's published installation instructions, this evaluation report, and the applicable provisions of the building code shall be followed when installing this product. The product described in this Uniform Evaluation service (UES) Report hes been evaluated as an alfemetive material design or method of construction in order to satisfy and comply with the intent of theprovision of tiro code, as noted in this report, end for at least equivalence to that prescribed in the code In quality, strength, effectiveness, fire resistance, durability and safely, as applicable, in accordance with IBC Section 104.11. This document shall only be reproduced in its entirety Copyright 02020 by International Association of Rumbing and Mechanical OOiaels. All fights msene. Printed in the United Stales. Ph, 1-877.41ESRPT • Fex: 909.472.4171 web: wviv.unifomres.org • 4755 East Philadelphia Sheet Ontario, Castomia 91761-2816— USA Page 1 of 12 (UJ City of O)idge r.Bl1�l��'QINISIOn VESEVALUATION ® Originally Issued: 04/01/2016 Revised: 04/30/2020 Where there is a conflict between these documents, the most restrictive provisions shall govern. The manufacturer's instructions and this report shall be available at the jobsite during construction for use by installers and for quality assurance. Design and installation shall be completed in accordance with the rules and regulations of the authority having jurisdiction. Local codes and practices shall be followed in regard to obtaining appropriate engineering reports and designs, arranging for appropriate oversight, and obtaining building permits commensurate with the extent of the work to be completed. 3.1 Design 3.1.1 General: When required by the building official and when appropriate for the extent of the work to be completed, engineering reports, calculations, and designs shall be submitted. The Allowable Strength Design (ASD) method shall be used, as defined in IBC Section 1602 and the Glossary of AISC 360. Structural analysis shall account for all internal forces (shear, bending moments and torsional moments, as applicable) resulting from the applied loads, load eccentricity and maximum spans between piles. The foundation design documentation shall include the following, in addition to other required data, for each pile assembly: assembly description and identification of each component of the assembly by model number and description; minimum embedment and torsional resistance termination criteria; design information and details for bracket installation including, where appropriate, details of bracket connection to structure, type and condition of structure to be supported, drill holes, bolts, washer plates, field welds, minimum concrete cover, concrete reinforcement, and leveling grout; the recommended angle of shaft installation and maximum permissible departure from that angle shall be specified for each bracket. The tabulated capacities of the helical pile systems shall be used to select appropriate helical pile foundation assemblies to support the design loads. For helical pile foundation systems subject to combined lateral and axial loads, the required strength under combined loads shall be determined using the interaction equation prescribed in Chapter H of AISC 360. The pile minimum embedment depth for various loading conditions shall be included and shall be based on the most stringent requirements of the following: engineering analysis, tested conditions described in this report, the site-specific geotechnical report, and site-specific load tests. The minimum soil embedment depth for a pile in compression shall be 5 feet (1524 mm) from the structure to the upper most helix. For vertical or battered piles in tension applications, the pile shall be installed such that the minimum depth from the ground surface to the uppermost helix is 12 times the diameter of the largest helix. 391 Valid Through: 04/30/2021 The overall capacity of each Grip-Tite® helical pile (in tension and compression) is equal to the capacity of the weakest component or link in the helical pile load path. The four primary structural elements associated with the helical foundation system; Bracket Capacity (PI), Shaft Capacity (P2), Helix Capacity (P3) and Soil Capacity (P4); shall be compared to determine the allowable capacity of each individual helical pile. The allowable capacity shall be the lowest allowable capacity of the four primary elements but shall be limited to no more than 60 kips (267 kN). 3.1.2 Bracket Capacity (Pl): The capacity of the supported concrete foundation shall be verified and/or designed and justified to the satisfaction of the code official. The design shall consider eccentricity of applied loads, including reactions of the brackets acting on the supported concrete foundation. Only localized limit states including (two-way) punching shear and concrete bearing, have been evaluated in this report. All other limit states described in ACI 318-14 Chapter 17 (2015 IBC) or ACI 318-11 Appendix D (2012 and 2009 IBC) for anchorage to concrete (breakout, pullout, and pry -out) shall be considered in design. The design shall include reactions provided by the brackets acting on the supported concrete foundation. Tables 5 and 6 of this report include selected allowable capacity ratings for the Standard Duty (retrofit) Bracket and New Construction Bracket, respectively. 3.1.3 Shaft Capacity (P2): Piles shall be braced in accordance with IBC Section 1810.2.2. The unbraced length of a pile, in accordance with Sections 1810.2.1, includes the length of piles standing in air or fluid, plus an additional embedded depth depending on the soil stiffness. The soil stiffness shall be quantified by the Standard Blow Count characteristics determined in accordance with ASTM D1586 (Standard Penetration Test). The maximum design loads shall not exceed the allowable capacities for fully braced conditions shown in Tables 3, 5 and 6. Where portions of the shaft are standing in air, water, or fluid, pile capacity shall be determined by a design professional. 3.1.4 Helix Capacity (P3): The load capacity (P3) for each of the 8 -inch, 10 -inch, 12 -inch and 14 -inch -diameter helices is 55 kips (245 kN), for both compression and tension. The capacities are additive for shafts with multiple helices. 3.1.5 Soil Capacity (P4): Soil capacity for site-specific conditions shall be determined by a registered design professional in accordance with Items 1 and 3 of IBC Section 1810.3.3.1.9, and considering groundwater and other geotechnical conditions. The design shall be based on soil resistance using the soils investigation report, the individual helix bearing capacities, and torque correlation factors from field qualification loading tests. The predicted load capacities shall be confirmed during pier installation. Combined lateral and axial capacity for soil is outside the scope of this evaluation report. Page 2 of 12 City of Wheat Ridge Building Division qce-) 391 Originally Issued: 04101/2016 Revised: 04/3012020 Valid Through: 04/30/2021 Soils investigation reports, when required, shall be submitted to the code official as part of the submittal documents required by IBC Section 107. The geotechnical report shall include the following (as applicable): 1. A site plan showing the location of the soil investigation (soil test borings, test pits, etc.) 2. A record of the soil boring logs and the laboratory test results from the soil samples obtained. 3. The soil profile. 4. The present and anticipated seasonal high groundwater tables, anticipated frost depth and corrosion -related parameters, as described in Section 2.7 of this report. 5. Soil properties of the major soil types encountered, that affect the design of the piles, and relative pile support conditions as defined in IBC Section 1803. These may include soil shear strength (i.e. wet unit weight, buoyant unit weight, cohesion, adhesion, un -drained shear strength, and internal friction angle) effecting the design and support conditions of the piles, as well as estimates of ultimate allowable soil bearing pressures, helical pile capacities and anticipated pile total and differential settlements. 6. A statement concerning the suitability of helical pile foundation system for the specific project. 7. Recommendations and data for the pile designer concerning soil strengths, existing loads adjacent to the installed pile, and any likely differential settlement. 8. Recommended center -to -center spacing of the helical piles, and any reduction of allowable loads due to the group action, if necessary. 9. Requirements for field inspection. 10. Pile testing requirements. 11. Any questionable soil characteristics and special design provision. When appropriate for projects consisting of stabilizing existing low-risk, lightly loaded structures, the pile capacity may be estimated using the torque correlation method along with load testing to determine an adequate allowable pile capacity in lieu of site-specific soil investigations. Each helical pile installed using the torque correlation method shall be load tested or pre -loaded to at least two times the estimated required pile capacity to reduce the risk of excessive post -installation settlement. With the individual helix bearing method, the total nominal axial load capacity of the helical pile is determined as the sum of the individual areas of the helical bearing plates times the ultimate bearing capacities of the soil or rock comprising the respective bearing strata for the plates. The design documentation shall include the derivation of the design allowable capacity and the minimum effective torsional resistance pile termination criterion, derived using the torque correlation method. The axial load capacity based on the torque correlation method shall be determined as follows: Qui = Kt(T) (Eq 1) Qan 0.5(Qmt) (Eq 2) Quit = Ultimate axial capacity of the helical pile in lbf (N), in tension or compression. Q,i = Allowable axial capacity of the helical pile in Ibf (N), in tension or compression, using a safety factor (F.S.) 0£2. Kt = For the RDS2875 2°/8 -inch (73 mm) round shaft helical piles, maximum torque correlation factors of 9 ft -I for compression and 7 W for tension shall be used. T = Effective torsional resistance, which is defined as follows: For single -helix piles supporting axial compression loads, it is the installation torque measured when the pile reaches its final tip embedment; for all piles supporting axial tension loads and for multi -helix piles supporting axial compression loads, it is the average of the last three installation torque measurements. Such torque measurements, in-Ibf (N -m), shall be made at 1 fbot (305 mm) increments of tip embedment as the lead helix moves from a position that is 2 feet (6 10 mm) prior to the final tip embedment. The design allowable axial load shall be determined by dividing the total ultimate axial load capacity predicted by the individual helix bearing method, field loading tests method, or the torque correlation method by a safety factor of at least 2. 3.1.6 Shaft Lateral Capacity: The lateral capacity of the RDS2875 piles referenced in Table 7 of this report is based on field testing of the pile shafts with a single 8 -inch diameter helical plate installed in a very stiff clay soil having an average Standard Penetration Test blow count of 20 bpf, at a minimum embedment depth of 15 feet (4.5 m). For soil capacity for lateral resistance in soil conditions substantially different than cohesive soils exhibiting an average SPT blow count of 20 bpf, the lateral capacity of the pile shall be designed by a registered design professional on a case-by- case basis. 3.1.7 Shaft Elastic Shortening and Lengthening: Elastic shortening or lengthening of a Grip-Tite® RDS2875 helical pile shaft may be a significant contributor to overall pile head movement under load for long piles. For loads up to and including the allowable load limits found in the tables of this report, the length change may be estimated as: &ha = PL/AE (Eq 3) 4,h.a = Length change of shaft resulting from elastic shortening or lengthening, in (mm). P = Applied axial load, Ibf (N). L = Effective length of the shaft, in (mm). A = Cross sectional area of the shaft, in' (mm'), shown in Tables I and 2 of this report. E = Young's modulus of the shaft, may be taken as 29,000 ksi (200,000 MPa). Page 3 of 12 City of Wheat Ridge Building Division YES"LUATION REPORT Na.-, Originally Issued: 04101/2016 Revised: 04/30/2020 The effective length of the shaft, L, may be approximated as the average of the distances from the point of load application to each helical plate. Potential deformations due to elastic shortening, elastic lengthening and slip in couplers will not significantly affect the allowable axial loads as tabulated in Table A of this report. The designer is advised, however, to consider such deformations when determining serviceability on a case-by- case basis. Table A Potential Coupler Slip: Coupler slip (Compression or Tension) Black 0.197 in/c Ir Gaiv. 0.151 in/c Ir Potential Elastic Shortening/Lengthening of Shaft and Coupler. Shaft Shortening (Compression) Black 0.00021 in/f/k Gaiv. 0.00020 in/ft/k Shan Lengthening (Tension I Black 1 0.00022 in/f/k Galv. 0.00019 in/ft/k Coupler Shortening (Cam ression) Black 0.000054 in/c Ir/k Gaiv. 0.0011050 in/c Ir/k Coupler Lengthening Tension Black 0.000062 in/c Ir/k V. 0.000053 in/c Irlk 3.2 Installation 3.2.1 General: The pile systems shall be installed by Grip - Theo approved and certified installers, and the foundation design documentation described in Section 3.1.1 of this report shall be utilized for installation quality control. The helical piles shall be screwed into the ground as specified in the construction documents and connected to the structure to provide foundation support. The piles shall be located and aligned both vertically and horizontally as specified in the approved plans and specifications. The piles shall be installed to the minimum torsional resistance and embedment depth specified. The piles shall be installed using portable or machine - mounted rotary hydraulic motors capable of exerting a torsional moment at least 10 percent higher than the minimum required installation torque. Equipment capable of measuring the torsional resistance experienced by the pile during installation to an accuracy of ±10 percent shall be used. The brackets shall be installed to connect the supported structures or foundation elements to the tops of the helical piles. If a galvanized product is used, field cutting and drilling shall be protected against corrosion. If the installation fails to meet the minimum criteria, the project specifications shall include provisions for an alternative design. 3.2.2 Field Quality Control: The following aspects shall be verified as part of the helical pile installation to help achieve a good quality result: 391 Valid Through: 04130/2021 1. The helical pile sections shall be assembled as specified by the design documents. 2. The installation equipment shall be adequately aligned with the pile to avoid bending the shaft. 3. An axial force shall be exerted as the helical pile is screwed into the ground so that the pile travels approximately 3 inches (76 mm) into the soil in each revolution. 4. The rotational rate shall be 5 to 25 rpm. 5. The torque needed to screw a pile into the soil is an important measure for control of helical pile installation quality. Torque shall be measured using a calibrated torque indicator or hydraulic torque motor with a known pressure/torque correlation (other methods to measure torque, i.e. shear pins, dial gauges, etc. may be used at the discretion of the registered design professional and if approved by the code official.) The following torque parameters shall be adhered to when installing the helical piles: a. Torque shall be recorded at every 5 feet of installation depth. b. Torque shall be recorded at final embedment (Er) + 2 feet, (Er) + 1 foot, and (Ef) for tension piles with only one helix and for piles with multiple helices. c. The final embedment depth and torque shall meet the minimum specifications of pile design. d. The final torque shall be taken as the average of the last three readings for piles with multiple helices. c. The pile's maximum installation torque rating listed in Table 3 of this report shall not be exceeded throughout installation. 3.2.2.1 FP3BA Standard Duty Bracket: The following aspects shall be verified as part of the installation of the Standard Duty Brackets to help achieve of a good quality result: I. Notching the footing or grade beam is recommended to allow the bracket to mount directly and adjacent to the load-bearing wall or column. Altering the existing foundation, including the reinforcing steel, shall only be performed with the approval of the registered design professional and the code official. 2. The installation of concrete anchors shall be in accordance with the code and the applicable anchor bolt manufacturer's recommendations. 3. The nuts shall be tightened so the all -thread rods achieve a snug -tight condition as defined in Section J3 of AISC 360 (as a minimum, nuts shall be tightened to one-quarter tum beyond hand -tight condition). 4. Any lifting or stabilizing of the structure shall be under the supervision of a qualified registered design professional to ensure that no part of the foundation, structure, or helical pile is overstressed. 5. The excavation shall be backfilled with properly compacted soil. City of Page 4 of 12 Wheat Ridge Building Division UESEVALUATION REPORT W4, 0 Originally Issued: 04/01/2016 Revised: 04/30/2020 6. If the pile system is designed to resist uplift forces, the pile may be attached to the bracket utilizing two optional holes factory drilled through the back side of the bracket sleeve. One or two'/4-inch (19 mm) by 2 - inch (51 mm) long high strength bolts are used to connect the bracket to the helical pile shaft. As an alternative, the holes could be plug welded to attach to bracket to the pile shaft if approved by the registered design professional and the code official. 3.2.2.2 NCB New Construction Bracket: The following aspects shall be verified as part of the installation ofthe New Construction Brackets to help achieve of a good quality result: 1. The helical pile sections shall be installed until the termination criteria prescribed in the foundation design documentation from Section 3.1.1 of this report are met and the top of the shaft is at or above the required elevation. The shaft shall be cut to the required height to provide the minimum concrete embedment depths into the footing or grade beam in Table 6 of this report and depicted in Figure 5 of this report shall be adhered to. 2. The new construction bracket shall be seated firmly. 3. Minimum concrete embedment depths for piles in compression and tension are listed in Table 6 of this report. Where the pile is used to resist tension forces, the bracket shall be bolted to the shaft with the bolts specified in Section 4.2.5 of this report. The nuts shall be tightened to snug -tight condition as defined in Section J3 of AISC 360 (as a minimum, nuts shall be tightened to one-quarter tum beyond hand -tight condition). 4. The steel reinforcing bars shall be placed and the concrete shall be poured according to the approved construction documents. 5. All helical pile components shall be electrically isolated from the concrete reinforcing steel and other metal building components. 3.3 Special Inspections: Special inspections shall be required in accordance with Chapter 17 of the IBC for helical pile foundations. The special inspector shall review all of the relevant design documentation including this evaluation report, the geotechnical report, and the construction documents prepared by the registered design professional in responsible charge to make sure the proper installation procedures are used and to determine compliance. Specific items to be inspected include installation equipment used, pile dimensions, tip elevations, final depth, final installation torque, and bracket configuration and dimensions. Where site welding takes place, special inspection in accordance with 2015 and 2012 IBC Section 1705.2 or 2009 IBC Section 1704.3 shall be required. Additionally, the special inspector shall verify the documentation showing that the installer is recognized by 391 Valid Through: 04/30/2021 the manufacturer; the product is assembled and installed as specified in the designs; the manufacturer's installation instructions are followed; the installation angle is as specified in the designs; and the pile and the supported structure are adequately connected to transmit the loads. 4.0 PRODUCT DESCRIPTION 4.1 General: The Grip-Tite® Helical Pile Foundation Systems consist of helical plates welded to the outside of steel tubing to form helical piles that are screwed into the ground until the design soil strata or design penetration resistance is reached. Extension sections are often required to advance the lead section to a soil deep enough to provide adequate soil bearing in accordance with project requirements. The structure to be supported is fastened to the tops of the helical piles using brackets described in Section 4.2.4 of this report. 4.2 Components 4.2.1 RDS2875 Lead Sections and Extensions: The lead and extension sections consist of 2'/8 -inch (73 mm) outside - diameter (OD) structural steel tubing having a minimum nominal shaft wall thickness of 0.262 -inch (6.65 mm). The sections are joined together by placing the coupler, which is at the leading end of each extension, over the shaft at the trailing end of each section, and pinning these ends together using three'/4-inch (19.1 mm) standard hex cap screws as described in Section 4.2.5 of this report. Figure I and Table 1 of this report address dimensions and details of lead sections, and Figure 2 and Table 2 of this report provide dimensions and details of extension sections. The lead sections and extensions are made of carbon steel round structural tubing conforming to ASTM A500, Grade B specifications, having a minimum yield strength of 50 ksi (345 MPa) and a minimum ultimate tensile strength of 58 ksi (400 MPa). The complete lead and extension sections are offered uncoated or with an optional galvanized coating complying with ASTM A123. 4.2.2 RDS2875 Helical Plates: The helical plates are cut from '/s -inch -thick (9.53 mm) steel plate and have outer diameters of 8-, 10-, 12-, or 14 -inches (203 mm, 254 mm, 305 mm, or 356 mm). The plates are deformed using a hydraulic press and die to achieve a 3 -inch, ±'/4 -inch (76.2 mm, t6.4 mm) helical pitch. The helical plates are welded to the outside of the steel tubing of the lead and extension sections using a'/4 -inch (6.35 mm) fillet weld in accordance with the manufacturer's approved quality control system as required to form the models listed in Tables 1 and 2 of this report. The plates are made of carbon steel conforming to ASTM A36, having a minimum yield strength of 36 ksi (248 MPa) and a minimum ultimate tensile strength of 58 ksi (400 MPa). Page 5 of 12 City of Wheat Ridge Building Division VES JM4LUATION REPORT 1 g, Oriainally Issued: 04/01/2016 Revised: 04/30/2020 4.2.3 RDS2875 Couplers: The couplers are made by welding 7 -inch (178 mm) lengths of 3'/2 -inch (89 mm) OD HSS structural steel tubing having a nominal shaft wall thickness of 0.300 inch (7.62 mm), to the leading ends of extension sections to form a bell-shaped attachment device. The couplers over -lap the extension tubing by 1 -inch (25.4 mm) and are welded in place using 04 -inch (6.35 mm) fillet weld. The couplers are made from ASTM A500, Grade B steel, having a minimum yield strength of 50 ksi (345 MPa) and a minimum ultimate tensile strength of 58 ksi (400 MPa). 4.2.4 Brackets: Brackets are used to connect the supported structures or foundation elements to the tops of the helical piles. The brackets are made from steel plate and round structural steel tubing assembled in accordance with the manufacturer's approved quality control manual. The'/s-, 42-,'/4-, and 1 -inch -thick (9.53 mm, 12.7 mm, 19.1 mm, 25.4 mm) steel plates used to make the brackets conform to ASTM A36 and have a minimum yield strength of 36 ksi (248 MPa) and a minimum ultimate tensile strength of 58 ksi (400 MPa). The standard duty retrofit bracket tubes consist of structural steel tubing conforming to ASTM A513, Type 5 Grade 1026 specifications having a minimum yield strength of 70 ksi (483 MPa) and a minimum ultimate tensile strength of 80 ksi (552 MPa). The new construction bracket tubes consist of HSS structural steel tubing conforming to ASTM A500, Grade B specifications having a minimum yield strength of 50 ksi (345 MPa) and a minimum ultimate tensile strength of 58 ksi (400 MPa). The brackets are described in Sections 4.2.4.1 and 4.2.4.2 of this report. All completed welded bracket assemblies are offered with an optional galvanized coating complying with ASTM A123. 4.2.4.1 GTFP3BA Standard Duty Bracket: The Standard Duty Brackets (repair or retrofit brackets) are used at the tops of the lead or extension sections to underpin and support existing structures. The brackets have two'/2-inch- thick (12.7 mm) steel plates welded together at a 90° angle to form a shelf to support the structure. The shelf is welded to a 12 -inch -long (305 mm), 37/. -inch -OD (98 mm) by 3'/. - inch -ID (79 mm) structural steel sleeve and a sleeve plate having dimensions of 5 inches (127 mm) by 9.5 inches (241 mm) by %-inch (19.1 mm) thick. The horizontal plate or shelf is 10 inches (254 mm) wide by 8 inches (203 mm) deep. The vertical plate, used to fasten the bracket to the existing structure, is 14 inches (356 mm) wide by 10 inches (254 mm) in height. Two'/. -inch -thick (9.5 mm) steel gusset wedges are welded between the sleeve and the underside of the shelf. An adjustable cap, having dimensions of 4 inches (102 mm) by 8 inches (203 mm) and 1 -inch -thick (25.4 mm), attaches to the sleeve plate using two 3/4 -inch (19.1 mm) all -thread rods with heavy hex nuts. The cap plate allows the bracket to be raised or lowered as necessary to the required height for the supported structure. K&9Y Valid Through: 04/30/2021 The vertical face of the repair bracket includes four '/16 - inch -diameter (14.3 mm) holes for use in connecting the bracket to supported concrete structures using concrete anchors, which are not supplied with the bracket assemblies. Anchors installed to support gravity, uplift, or lateral loads shall be designed by a qualified design professional and shall be galvanized in accordance with the recommendations of the designer and the anchor manufacturer for the application in which they are used. 4.2.4.2 GT2875-NCB New Construction Bracket: The New Construction Bracket is used to support new concrete foundation structures (grade beams, footings, or pile caps) where the bracket's bearing plate is cast into the concrete. The steel bearing plate is 4 inches wide by 8 inches long by 1 inch thick (102 mm by 203 mm by 25.4 mm). The plate is welded to a 3V2 -inch -OD (89 mm) by 2.9 -inch -ID (74 mm) by 7 -inch -long (178 mm) steel coupling sleeve that fits over, and is bolted to, the top of a lead or extension section using 3/4 inch (19.1 mm) standard hex cap screws and matching standard hex nuts. The bracket transfers compression, tension, and lateral loads from the concrete foundation structure to the helical pile. 4.2.5 Threaded Rods, Bolts and Nuts: The %-inch (19.1 mm) standard hex cap screws (bolts) used injoining the lead shafts and extensions and to connect the new construction brackets to the tops of the piles conform to SAE J429, Grade 8 specifications, having a minimum yield strength of 130 ksi (896 MPa) and a minimum ultimate tensile strength of 150 ksi (1034 MPa). The standard hex nuts used with the standard hex cap screws conform to SAE J995, Grade 8 specifications. The standard hex cap screws and matching standard hex nuts are zinc coated in accordance to ASTM F1941. The'/4-inch (19.1 mm) all -thread rods and matching heavy hex nuts are used to attach the cap plate to the sleeve plate on the standard duty retrofit bracket. The all -thread rods conform to ASTM A193, Grade B7 specifications, having a minimum yield strength of 105 ksi (724 MPa) and a minimum ultimate tensile strength of 125 ksi (862 MPa). The heavy hex nuts conform to ASTM A194, Grade 2H, or ASTM A563, Grade DH specifications. The all -thread rods and heavy hex nuts are zinc coated in accordance to ASTM B633. 4.2.6 Welds: Factory welds used in the assembly of the helical pile plates, shafts, couplers, and brackets are completed in accordance with the product drawings and the manufacturer's approved quality control manual. Field welds are outside the scope of this report and shall be designed by a qualified design professional and inspected in accordance with 2018, 2015, and 2012 IBC Section 1705.2 or 2009 IBC Section 1704.3. Page 6 of 12 City of Wheat Ridge Building Division iva 391 Originally Issued: 04/01/2016 Revised: 04/30/2020 Valid Through: 04/30/2021 5.0 IDENTIFICATION 7.0 STATEMENT OF RECOGNITION: The Grip-Tite® Manufacturing Co., LLC Model RDS2875 Helical Foundation System components described in this report shall be identified by labels that include the report holder's name (Grip-Tite® Manufacturing Co., LLC), the product catalog number and description, the name and address of Co -Line Welding, Inc. Additionally, Model RDS2875 helical piles are identified by the prefix "RDS", the Standard Duty Brackets are identified by the prefix "FP" and the New Construction Brackets are identified with "NCB". The evaluation report number (ER -391) the IAPMO Uniform ES Mark of Conformity shall be used to identify the products recognized in this report. A die -stamp label may also substitute for the label. Either Mark of Conformity may be used as shown below: IgPMO SES ES ® 01 Qq IAPMO UES ER -391 6.0 SUBSTANTIATING DATA Data in accordance with the ICC -ES Acceptance Criteria for Helical Pile Systems and Devices (AC358), approved September 2017, editorially revised September 2018. This report describes the results of research carried out by the IAPMO Uniform Evaluation Service on Grip-Tite® Helical Pile Foundation System labeled in Winterset, Iowa, under the supervision of IAPMO UES, to assess its conformance to the codes and standards listed in Section 1.0 and serves as documentation of the product certification. Brian Gerber, P.E., S.E. Vice President, Technical Operations Uniform Evaluation Service Richard Beck, PE, CBO, MCP Vice President, Uniform Evaluation Service GP Russ Chandy CEO, The IAPMO Group Fitt addition it inCurn,ation abort this ev:d nation report please visit or email at Page 7 of 12 City of Wheat Ridge Building Division Originally Issued: 04/01/2016 36 Figure 1. RD52875 Lead Sections E Revised: 04/30/2020 FI,jure 2. RDS2375 Extensions A.V Ah Ar +' At A:e [ FF N i Pln Caecting Plle Shag Bogs/Nuts Figure 4. RD52875-NCB New Construction Bracket Page 8 of 12 391 Valid Through: 04/30/2021 K AI lu I �I F6jure 3. FP3BA Standard Duty Remedial Repair Bracket 3' min �— Y-4' nln O As//Requiredby Design 1 _r As Requited by Design Figure 5. Grade Beam/Pier Cap with RDS2875-NCB New Construction Bracket City of Wheat Ridge Building Division 391 Originally Issued: 04/01/2016 Revised: 04/30/2020 Valid Through: 04/30/2021 lable 1 Dimensions of Tvpical Grip-Tite® RDS2875 Ilei ical Pile Lead Sections bV Product Catalog Number 3 Material' Catalog Numbers Shaft Cross - Sectional Area', (in') Nominal Dimensions', (in) AT B C D E F 3F G H 3H I J K ASTM A.500 Fr=501ui Fu -581u1 21,S8 21,S10 1.72 o.%) 2.839 (2.869) 5.873 1.5 0.8125 (13/16) 24 8 18.12 - - 24 to 18.125 - - - 21, 12 24 12 18.125 21S14 5LS8 24 14 18.125 60 8 4.125 51,910 60 10 4.125 5LS12 60 12 - 4.125 - - - 51sa10 60 8 24 4.125 10 - 30.125 - - SL514 SM1012 60 14 - 4.125 - - 60 10 30 4.125 12 24.125 51,.51214 7LS8 60 12 M 4.125 14 18.125 84 8 78.125 - - - - - 7LS10 7LS12 84 to 78.125 4 12 78.12.5 71.5810 4 8 34 78.125 10 4.125 72514 71S1012 4 14 78.125 54 10 30 78.125 12 48.125 7"81012 7L 1214 4 8 24 78.125 to 30 4.125 12 24.125 4 12 36 78.125 14 42.125 71,8101214 4 10 311 78.125 12 M 42.125 14 12.125 F9, Sr fme, =25.4mm;1in'-645.2 mm'; I psi=6.89 kPa; I ksi -I,O psi Table 2 Dimensions of Typical Grip-Titee RDS2875 Helical Pile Extensions by Product Catalog Number 4 Material' Catalogs Number' Shaft Cross -Sectional Area 2, (int) Nominal Dimensions', in A 2 B C D E F 3F G H 311 1 ASTM A500 Fy-50 WI N-58lu1 3E 192 (1.96) 2.a39 (2.869) T's 00.8125 (013/16) 36 Plnin Eafenvione 5E 11.875 60 Plain Ezlenaons 7E 3E14 4 Plain Ealenei9ne 36 14 2A.125 5E14 IL875 60 14 48.125 - MU 29.875 60 14 30.125 7E14 7E14, IL875 4 14 72.125 29.875 11.875 4 14 - 4.125 7E14i4 4 14 42 72.125N14 30.125 1F.141Ja 29.875 4 IJ 42 4.125 12.135 For S1. I inch= 25A mm', 1 In' = 64.5 2 mm', 1 psi = 6.89 kPa; 1 ksi = 1,000 psi Footnotes to Tables 1 and 2: 1) Shaft and coupler material consists of round shaft structural tubing per ASTM A500, Grade B, minimum yield strength, Fy, of 50 ksi and minimum ultimate tensile strength, Fu, of 58 ksi. Helices are made from flat plate steel per ASTM A36, minimum yield strength, Fy, of 36 ksi and minimum ultimate tensile strength, Fu, of 58 ksi. Connection bolts are SAE J429 Grade 8, minimum yield strength, Fy, of 130 ksi and minimum ultimate tensile strength, Fu, of 130 ksi. The bolts are either zinc coated per ASTM 8633 or ASTM B695, or galvanized per ASTM A153. The helical lead sections and extensions are either bare "black" steel or hot- dip galvanized per ASTM A123. 2) Bear or black steel dimensions (dimensions galvanized): Includes reduced dimensions for corrosion and a 50 year design life. 3) Figure 1 of this report illustrates dimensions. 4) Figure 2 of this report illustrates dimensions. 5) Galvanized product have a "G" suffix added to the end of the product's catalog number; i.e., 2LS8 is bare steel and 2LS8G is galvanized steel. Page 9 of 12 City of Wheat Ridge Building Division Originally Issued: 04/01/2016 Revised: 04/30/2020 391 Valid Through: 04/30/2021 Table 3 Allowable Capacities 4 and Recommended Maximum Installation Torque for Grip-Titeo RDS2875 Belical files 1'2 torsi, 1 inch= 25.4 mm; I a-lbf- 1.356 N -m; I kip u" 16Q - 4.48I IN; 1 in° - 645.2 ci 10, = 6,89 kPa; I ksi - 1.000 psi 1) Section 3.1.3 of this report provides the description of unbraced length, soft and firm soil conditions. 2) Capacity ratings include an allowance for corrosion over a minimum 50 year service design life and presume the supported structure is braced in accordance with IBC Section 1810.2.2 and the lead section will provide sufficient helical capacity to develop the full shaft capacity. Section 3.1.2 of this report describes applicable limit states that shall be evaluated by a registered design professional. 3) Maximum useable torque for calculating the pile's ultimate capacity using the equation Quit = TKt. Maximum torque applied to the helical pile anytime during installation should not exceed 9,495 ft -Ib for the RDS2875 helical piles. 4) The listed capacity -to -torque ratios may be adjusted to lower values on a case-by-case basis, if necessary. The listed allowable capacity includes a minimum Factor of Safety (FS) of 2. A higher Factor of Safety may be used to estimate the pile's allowable capacity on a case-by-case basis, if necessary. 5) No eccentricity. Table 4 Grip-Tite® Standard Duty and New Construction Bracket Dimensions by Product Catalog Number Allowable Axial Capacity Limits' Bare Steel Hot -Di Galvanized Recommended aecovur'^'ded lru'u, Allowable Product Capacity -Torque Ratio t nt.11i um Inemlletion Targne Cnpuity, Tmgne Onpaeity Com re n, kir sin Gi off J Unbriced All=rhreaded Tendon, Shea, Baidine, ' Kt, (ft') Torque', (kipQ (kips) Length, kLu-0 kl,u=5 kLn=10 kLu-15 odpq tkipq (a -k) Concrete T(R-Ibq Qu -TM Qu/2-0a D Lu' on Fw Gw K oM Rods/Bolts Anchors' ASTM A.500, 0 55.5 Cou lin s' 60.0 18.1 19.9 8.3 9.0 4A 4.8 Ft Gt Iw Compreecign di. -pitch x Grp 32.1 I6.] 2.52 KI -9 9,000 81 40.5 l J.5.0 16.8 8.1 4.4 Fy-So WI Cou lin 40,8 19.0 8.9 4.8 (18.4) (2.96) 'Cet-7 9,000 63 31.5 2 22.6 13.4 7.2 4,1 Fu -58 Wi 9.25 Kt-] 3/4. 10.12 Coups 26.0 15.0 7.9 0.5 R5 8 9/16 1..5 ASTM A193 Gr B7 Titen HD Se. torsi, 1 inch= 25.4 mm; I a-lbf- 1.356 N -m; I kip u" 16Q - 4.48I IN; 1 in° - 645.2 ci 10, = 6,89 kPa; I ksi - 1.000 psi 1) Section 3.1.3 of this report provides the description of unbraced length, soft and firm soil conditions. 2) Capacity ratings include an allowance for corrosion over a minimum 50 year service design life and presume the supported structure is braced in accordance with IBC Section 1810.2.2 and the lead section will provide sufficient helical capacity to develop the full shaft capacity. Section 3.1.2 of this report describes applicable limit states that shall be evaluated by a registered design professional. 3) Maximum useable torque for calculating the pile's ultimate capacity using the equation Quit = TKt. Maximum torque applied to the helical pile anytime during installation should not exceed 9,495 ft -Ib for the RDS2875 helical piles. 4) The listed capacity -to -torque ratios may be adjusted to lower values on a case-by-case basis, if necessary. The listed allowable capacity includes a minimum Factor of Safety (FS) of 2. A higher Factor of Safety may be used to estimate the pile's allowable capacity on a case-by-case basis, if necessary. 5) No eccentricity. Table 4 Grip-Tite® Standard Duty and New Construction Bracket Dimensions by Product Catalog Number For SI. 1 inch = 25 4 mm; 1 psi -6.89 kPr, I ksi =1,000 psi 1) Main plate dimensions in direct contact with supported foundation. 2) 12 -inch -long all -thread rods and nuts are provided with the remedial brackets. Longer or additional rods may be used if additional lift is needed, as necessary. 3) Concrete anchors shall be provided by the installer; 'IA -inch -diameter concrete anchors may be used to fasten the remedial brackets in place. The brackets were tested with four post -installed Then HD screw anchors fastened through the face of the bracket into the side of a concrete supported footing with a minimum 2,500 psi compressive strength. Anchors installed to support gravity, uplift, or lateral loads shall be designed by a registered design professional and installed in accordance to the manufacturer's recommendations. 4) Figures 3 and 4 of this report show the FP3BA and NCB Brackets, respectively. Galvanized products include the suffix "G". Page 10 of 12 City of Wheat Ridge Building Division Hw RI Aw Bw C FI Gi off J All=rhreaded Eh M Concrete Ah Bit D End Fw Gw K oM Rods/Bolts Anchors' At' Bt' Dt Ft Gt Iw L di. -pitch x FP,.d.c't,� of length', (in) in in in in in in in in in 9.25 3/4. 10.12 14 10 2 R5 8 9/16 1..5 ASTM A193 Gr B7 Titen HD Se. l0 a 5 12 4 4.513/16 3 mJ ASTM A194 Ane6mr. or 1/2 1/2 3/8 L]/85 3/4 1 12.5 1 2H Heavy Hex Nuts equivalent 9/Ifi Fy=105 WI Ill F. 125 WI RDS2875-NCB RDS287SNCBG 4 - 7- - - 1.5 3/4-10x41/2 Fi re4 1 }I/2 13/16 SAE 3429 Gntle8 For SI. 1 inch = 25 4 mm; 1 psi -6.89 kPr, I ksi =1,000 psi 1) Main plate dimensions in direct contact with supported foundation. 2) 12 -inch -long all -thread rods and nuts are provided with the remedial brackets. Longer or additional rods may be used if additional lift is needed, as necessary. 3) Concrete anchors shall be provided by the installer; 'IA -inch -diameter concrete anchors may be used to fasten the remedial brackets in place. The brackets were tested with four post -installed Then HD screw anchors fastened through the face of the bracket into the side of a concrete supported footing with a minimum 2,500 psi compressive strength. Anchors installed to support gravity, uplift, or lateral loads shall be designed by a registered design professional and installed in accordance to the manufacturer's recommendations. 4) Figures 3 and 4 of this report show the FP3BA and NCB Brackets, respectively. Galvanized products include the suffix "G". Page 10 of 12 City of Wheat Ridge Building Division We �.�391 Originally Issued: 0 410112 01 6 Revised: 04/30/2020 Valid Through: 04/30/2021 Table 5 Grip-Titek' Standard Duty Bracket Allowable Capacities by Product Catalog Number For Sr: I inch —25.4 mm; I kip (IOW Us = 4 48 kN; I psi = 6.89 kPa; I ksi - I.000 psi 1) Main plate dimensions in direct contact with supported foundation. 2) Based on full scale load tests conducted using the Grip-Tite® Standard Duty Bracket (FP3BA). The allowable capacities include a minimum Factor of Safety (FS) of 2: a higher Factor of Safety shall be used on a case-by-case basis, if necessary. 3) Systems that require uplift capacities shall include two 1/4 -inch x 2 -inch -long bolts thru the bracket tube sleeve into the existing shaft. One or two '/4 inch diameter by 2 -inch -long bolts may be installed. As an alternative, the bracket may be secured to the pile shaft by other means as directed by a registered design professional. Corrosion protection includes zinc coated per ASTM B633 or ASTM B695. 4) Fully braced foundation and shaft conditions. 5) Lateral capacities were tested using four Titen HD concrete anchors with a minimum embedment of 5 inches. 6) The brackets were tested with four post -installed Titen HD screw anchors fastened through the face of the bracket into the side of a concrete support with minimum 2,500 psi compressive strength. Anchors shall be designed by a qualified design professional and installed in accordance to the manufacturer's recommendations. 7) Figure 3 of this report depicts the Standard Duty Remedial Bracket, FP3BA. Galvanized product includes the suffix "G". Page 11 of 12 City of Wheat Ridge Building Division RDS2875 Main Plate Dim. ' ASTM A500 Fy = 50 ksi Fu = 58 ksi All -Thread Rods 3 Product' Concrete Anchors"' Allowable Capacities a•''4.5, (kips' Aw, Ah, At Bev, Bh, Bt (in) (in) Comp., Tension,' Lateral, din. -pitch x (kips) (kips) (kips) length, (in) (RI) 3/4. 10.12 ASTM A 19 Gr B7 and Tion His Seim Anchors, or FP38A 1010, 1/2 10, in 8, 27 9.5, 19 10 ASTM AI94 equivalent FP3BAG ' 2H Heavy Hex Nuts 1a" Fy =105 kei Fu =125 ksi For Sr: I inch —25.4 mm; I kip (IOW Us = 4 48 kN; I psi = 6.89 kPa; I ksi - I.000 psi 1) Main plate dimensions in direct contact with supported foundation. 2) Based on full scale load tests conducted using the Grip-Tite® Standard Duty Bracket (FP3BA). The allowable capacities include a minimum Factor of Safety (FS) of 2: a higher Factor of Safety shall be used on a case-by-case basis, if necessary. 3) Systems that require uplift capacities shall include two 1/4 -inch x 2 -inch -long bolts thru the bracket tube sleeve into the existing shaft. One or two '/4 inch diameter by 2 -inch -long bolts may be installed. As an alternative, the bracket may be secured to the pile shaft by other means as directed by a registered design professional. Corrosion protection includes zinc coated per ASTM B633 or ASTM B695. 4) Fully braced foundation and shaft conditions. 5) Lateral capacities were tested using four Titen HD concrete anchors with a minimum embedment of 5 inches. 6) The brackets were tested with four post -installed Titen HD screw anchors fastened through the face of the bracket into the side of a concrete support with minimum 2,500 psi compressive strength. Anchors shall be designed by a qualified design professional and installed in accordance to the manufacturer's recommendations. 7) Figure 3 of this report depicts the Standard Duty Remedial Bracket, FP3BA. Galvanized product includes the suffix "G". Page 11 of 12 City of Wheat Ridge Building Division 391 Originally Issued: 0 410112 01 6 Revised: 04/30/2020 Valid Through: 04/30/2021 Table 6 Grip-Tite® New Construction Bracket Minimum Embedment Depths and Allowable Capacities by Product Catalog Number For S1: 1 inch ='-5 4 mm; 1 kip (Io0016f) - 4.48 kN, 1 psi - 6.89 kPa; 1 ksi 1,000 psi I) Main plate dimensions in direct contact with foundation. 2) 'Phe listed allowable capacities are limited by either the punching shear capacity of the grade beam, bearing or bending capacity of the bracket plate, the weld strength between the bearing plate and the bracket sleeve, or the shear capacities of the connecting bolts. The allowable capacities include a minimum Factor of Safety (FS) of 2. A higher Factor of Safety shall be used on a case- by-case basis, if necessary. 3) Systems that require uplift capacities shall include three % inch diameter x 4'/2 -inch -long bolts thru the bracket tube sleeve into the pile shaft. Bolt corrosion protection shall be zinc electroplated per ASTM F1941. As an alternative, the bracket may be secured to the pile shaft by other means as directed by a registered design professional. 4) Fully braced supported foundation and shaft conditions. 5) Figure 4 of this report depicts the New Construction Bracket, RDS2875-NCB. Galvanized products include the suffix "G". 6) Connection of the bracket to the foundation as it relates to resisting side loads due to seismic forces and the provisions found in IBC Section 1810.3.11.1, is outside the scope of this report. Table 7 Lateral Load Pile Type Allowable Lateral Capacity (Ibs) RDS2875 RDS2875 Main Plate 1 15 Dimensions', ASTM A500 (in' Fy = 50 ksi Fu = 58 ksi Product Allowable Allowable Aw Minimum Concrete Cover Below (Tension) Compression and Tension Lateral A and Above (Compression) Capacities, (kips) ¢,2.4 Capacities, At the Bracket Plate, (in) Bare Steel or Galvanized (kips) 2500 psi PCC 2500 psi PCC 3 Tenimi 1.4 4 Comp 8.2 6 Teishis 8.2 8 C.nsp 14.8 8 ComTonshn1 14.8 23A RDS2875-NCB 4 2.5 1 10 Tmsion 23.0 Com 32.9 12 T4mian 32.9 Co. 40.0 For S1: 1 inch ='-5 4 mm; 1 kip (Io0016f) - 4.48 kN, 1 psi - 6.89 kPa; 1 ksi 1,000 psi I) Main plate dimensions in direct contact with foundation. 2) 'Phe listed allowable capacities are limited by either the punching shear capacity of the grade beam, bearing or bending capacity of the bracket plate, the weld strength between the bearing plate and the bracket sleeve, or the shear capacities of the connecting bolts. The allowable capacities include a minimum Factor of Safety (FS) of 2. A higher Factor of Safety shall be used on a case- by-case basis, if necessary. 3) Systems that require uplift capacities shall include three % inch diameter x 4'/2 -inch -long bolts thru the bracket tube sleeve into the pile shaft. Bolt corrosion protection shall be zinc electroplated per ASTM F1941. As an alternative, the bracket may be secured to the pile shaft by other means as directed by a registered design professional. 4) Fully braced supported foundation and shaft conditions. 5) Figure 4 of this report depicts the New Construction Bracket, RDS2875-NCB. Galvanized products include the suffix "G". 6) Connection of the bracket to the foundation as it relates to resisting side loads due to seismic forces and the provisions found in IBC Section 1810.3.11.1, is outside the scope of this report. Table 7 Lateral Load Pile Type Allowable Lateral Capacity (Ibs) Minimum Installation Depth (ft) RDS2875 1 318 1 15 For SI: I inch = 25 4 mm; I kip (1000 Rho a 4.48 W. 1 psi n 689 kPa; 1 ksi = ].000 psi I ) Installation shall be in accordance with Section 3.1.5 of this report. Installation is limited for use with new construction brackets. Minimum concrete edge distance to bracket plate is 4 inches. Page 12 of 12 City of Wheat Ridge Building Division ON SITE PLANS CITY OF WHEAT RIDGE INSPECTION REQUIRED PRIOR TO BACKFILL MUST BE ON SITE FOR INSPECTION PROVIDE ENGINEER OBSERVATION LETTER AT FINAL INSPECTION ALL Prolectsare Subject to Field Inspections After excavation and before placement of foundation devises engineer to conduct evaluation City of and verification of in-situ soils at the bottom of Wheat E�' pier pits. Contractor to notifyengineer 48 hours �oMMUNrIY nrVfIUYMENT P ['b' 1 APPROVED in advance. Reviewed for Code Compliance 6 F CONVERTED Randy Slusser 8/11/2020 GARAGE Plans Examiner Date Va.XXln,ulximll:,M;.uo,ve WNpmrtwmlmmlWWmmn;llmXum anOmmpwalwmahvNnmbaa PnnN(a;Y anmWmvla(. P % mrmonb anYoltMOroWtNrvu nl Me bwMn9 totlea WWl ph mElidiml. Perm Xe gemmiip mpNe aN.Ywlry m MOIM amriRl rM pwWms of rM Mtl4Uq 6 FT mdmaotMrWINnenmiWrM pN+NNN mtMrexa 3 -1 — — IL - p>ZNDO front door oy O17 A'G PrP 8 FT 6 FT z' 28253 by •: : a o • Ss •' G r VP �� �O ,fit, NOTE: LOADING CRITERIA USED FOR DESIGN 7. Helix piers 1,2 and 5 shall be placed evenly not more than six feet apart along front foundation wall. 8. All work to be in conformance with 2018 IRC with Wheatridge 2020 amendments. 1. Floor Load 40 psf LL + 15 psf DL 9. All devices shall comply with ICC,withAC358:2015 IBC second 1810.3.3.1.9 & 1810.4.11 2. Roof Load 35 psf LL + 15 psf DL 10. all helix piers shall be placed 24 feet or a minimum of 3,500 ft -lbs touque. If bedrock is encountered 3. Wind Load 149 MPH ( exp "C")(VULT) before 25 feet contact engineer for direction. 4. Snow load Ground 50 PSF 5. Presumptive soil bearing pressure is 1500 psf Ms. Bowles 1 730 Otis St. Wheatridge C 6. Helix 3 be 6 inches front foundation. piers shall placed within of corner of -- � .I. w s " �' W sz planview cover := A i CITY OF WHEAT RIDGE Building Inspection Division (303) 235-2855 Office INSPECTION NOTICE Inspection Type: Job Address: ,� _"_ % Permit Number: ®/ -5:317 ❑ No one available for inspection: Time CMIPM Re -Inspection required: Yes 6 ) When corrections have been made, schedule for re -inspection online at: http✓/www. ci. wheatridge. co. uslinspection Date: 9 /_ o Inspector: 5,,'` I DO NOT REMOVE THIS NOTICE PERMIT NO: JOB ADDRESS: JOB DESCRIPTION: City of Wheat Ridge Residential Foundation Repair PERMIT - 202001537 202001537 4730 Otis St Foundation repair, 5 helical piers. ISSUED: 08/12/2020 EXPIRES: 08/12/2021 *** CONTACTS *** OWNER (720)338-6135 BOWLES SARAH R SUB (303)805-8751 RODNEY MARTIN 060125 COMPLETE BASEMENT SYSTEMS *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 9,025.00 FEES Total Valuation 0.00 Plan Review Fee 132.80 Use Tax 189.53 Permit Fee 204.30 ** TOTAL ** 526.63 *** COMMENTS *** *** CONDITIONS *** A printed copy of the permit and city stamped on-site plans must be available on-site for the first inspection. Approved per plans and red -line notes on plans. Must comply with 2018 IRC, 2020 NEC and all applicable City of wheat Ridge Municipal Codes. Work is subject to field inspections. Inspection by Wheat Ridge Building Inspector required prior to backfill. Observation letter from Engineer to be provided to Wheat Ridge Building Inspector at Final Inspection. m t r City of Wheat Ridge y Residential Foundation Repair PERMIT - 202001537 PERMIT NO: 202001537 ISSUED: 08/12/2020 JOB ADDRESS: 4730 Otis St EXPIRES: 08/12/2021 JOB DESCRIPTION: Foundation repair, 5 helical piers. I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am leggally authorized to include all entities named within this document as parties to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4, No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. (, T bl( or gra i g of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any a 1' ole ode or ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. ®� r City of Wheat Ridge Resid. Windows/Doors PERMIT - 201708255 PERMIT NO: 201708255 ISSUED: 10/12/2017 JOB ADDRESS: 4730 Otis ST EXPIRES: 10/12/2018 JOB DESCRIPTION: Residential Window replacement of 5 windows, like for like same size, u -factor of .32 or better. *** CONTACTS *** OWNER (720)338-6135 ATNES ROGER G SUB (303)574-9594 Rick Rose 080085 Window World of Denver *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Umass geed SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 1,500.00 FEES Window Replacement 50.00 Total Valuation 0.00 Use Tax 31.50 ** TOTAL ** 81.50 *** COMMENTS *** *** CONDITIONS *** Windows shall comply with all applicable codes, have a .32 or better U -factor and shall he safety glazing if within a tub enclosure, less than 18 inches above the floor, or with;: inches of a vertical edge of a door. I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specification,, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this_permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed nd that all work to -be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Si ure of 04<ER or CONTRACT (Circle one) Date 1. This permit was issued base nformation provided in thepermit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and maybe subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for or an approval of, any violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. A Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City of Wheat�idge COMMUNITY DEVELOPMENT Building & Inspection Services Division 7500 W. 29" Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 FOR OFFICE USE ONLY Date: & 11-7 Plan/Pennit # A Plan Review Fee: Building Permit Application *** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: q-130 () T s !� + Property Owner (please print): R o c) z r A+-) e S Phone: 7 2 u - 33& - Property 3& Property Owner Email: Mailing Address: (if different than property address) Address: , State, Zip: Architect/Engineer: Architect/Engineer E-mail: Contractor: 1 v o y C� 4 - Phone: Contractors City License #: S 0 0� S Phone:_ Contractor E-mail Address: C.i �( ro n ud Go o H U Co I orado . l_ o %l-� Sub Contractors: Electrical: W.R. City License # Other City Licensed Sub: City License # Plumbing: W.R. City License # Other City Licensed Sub: City License # Mechanical: W.R. City License # Complete all information on BOTH sides of this form Description of work: (Check all that apply) ❑ NEW COMMERCIAL STRUCTURE ❑ ELECTRICAL SERVICE UPGRADE ❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING ❑ COMMERCIAL ADDITION [1_BE.,5IDENT1AL ROOFING ❑ RESDENTIAL ADDITION INDOW REPLACEMENT ❑ COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT ❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT ❑ ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT ❑ OTHER (Describe) (For ALL projects, please provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc.) Sq. Ft./LF Amps L-) I4,e - L,lt,;, S; Z e 5 5 t- r,Aa�,J; Al l 0, ) Z , f -T-47 r V 1- �D -L. t / f-`' Btu's Squares Gallons Other Project Value: (Contract value or the cost of all materials and labor included in the entire project) OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this applic CIRCLE ONE: (OWNER) (CONTRACTOR) o (AUTHORIZED PRESENTATIVE) )o (OWNER) (CONTRACTOR) PRINT NkN[E: ' 4- 1. SIGNATURE: DEPARTMENT USE ONLY ZONING COMMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer: PUBLIC WORKS COMMENTS: Reviewer: PROOF OF SUBMISSION FORMS Fire Department ❑ Received ❑ Not Required Water District ❑ Received ❑ Not Required Sanitation District ❑ Received ❑ Not Required OCCUPANCY CLASSIFICATION: Building Division Valuation: $ Sales Person: 9 - SHON ROMINES Dealer Name: 881420 WINDOW WORLD OF DENVER -N/A Tim Order Notes: Delivery Notes: Ship To: Phone: (303)574-9594 Quote Name: ATNES, ROGER Customer Acknowledgement Quote Date 9/28/2017 Date Ordered Quote Not Ordered Fax: Project Name: ATNES, ROGER QUOTE # RUSH STATUS PO# 1595530 No None Line Item # Qty Width x Height UI Description 1 1 34.375" X 35.375" 71 Comment /Room: DORMER 03AO-NEW 4000 Series Single Hung 34.375 x 35.375 Sash Split = Even Operation / Venting = Single Hung Composite Reinforcement, Frame Option = Standard Block Frame Frame Color = White SolarZone, Double Strength, Glass Breakage Warranty U -Factor = 0.28. CR = 58, SHGC = 0.28, VT = 0.49, CPD = ASO -A-92-00240-00001 Flat, Colonial, White, 2V1H Header Expander, Brickmould = No Brickmould, Frame Size Line Item Notes: Line Item # Qty Width x Height UI Description 2 1 34.25" X 34.25" 70 ----- 34.25 Comment / Room: DORMER2 03AO-NEW 4000 Series Single Hung 34.25 x 34.25 Sash Split = Even Operation / Venting = Single Hung Composite Reinforcement, Frame Option = Standard Block Frame Frame Color = White SolarZone, Double Strength, Glass Breakage Warranty U -Factor = 0.28, CR = 58, SHGC = 0.28, VT = 0.49, CPD = ASO -A-92-00240-00001 Flat, Colonial, White, 2V1 Header Expander, Brickmould = No Brickmould, Frame Size Line Item Notes: Page 1 Of 3 QUOTE # RUSH STATUS PO# 1595530 Yes None Line Item # Qty Width x Height UI Description 3 1 35.125' X 50.25' 87 t� 0 35.125 Comment! Room: RIGHTOFDOR 03S2 -New 4000 Series XO 35 1/8 x 50 1/4 Frame Width = 35.125, Frame Height = 50.25, Sash Split = Even Operation / Venting = XO Frame Option = Standard Block Frame, Composite Reinforcement Frame Color = White SolarZone, Double Strength, Glass Breakage Warranty Lock Height = Standard Lock Height Standard Screen Standard, Colonial, Grid Color = White, 1V3H Foam Enhanced, Net Overall Line Item Notes: Line Item # Qty Width x Height UI Description 4 1 33.75' X 40.875' 75 1 +l r i l I, fl f ; £ E r 33 75 Comment /Room: LEFT 03S2 -New 4000 Series XO 33 3/4 x 40 7/8 Frame Width = 33.75, Frame Height = 40.875, Sash Split = Even Operation / Venting = XO Frame Option = Standard Block Frame, Composite Reinforcement Frame Color = White SolarZone, Double Strength, Glass Breakage Warranty Lock Height = Standard Lock Height Standard Screen Standard, Colonial, Grid Color = White, 1V3H Foam Enhanced, Net Overall Line Item Notes: Line Item # Qty Width x Height UI Description 5 1 71.625' X 50.25" 123 Comment / Room: RIGHTOFDOR 03S3 -New 4000 Series XOX 71 5/8 x 50 1/4 Frame Width = 71.625, Frame Height = 50.25, Sash Split =1/4-1/2-1/4 Operation / Venting = XOX Frame Option = Standard Block Frame, Composite Reinforcement Frame Color = White SolarZone, Double Strength, Glass Breakage Warranty Lock Height = Standard Lock Height Standard Screen Unit 1 Left, 1 Right: Standard, Colonial, Grid Color = White, 1V3H Unit 1 Center: None Foam Enhanced. Net Overall Line Item Notes: Page 2 Of 3 i CITY OF WHEAT RIDGE _��9rBuilding Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax P INSPECTION NOTICE Inspection Type: h _ Job Address: V7 -,?h a/ Permit Number: a 0/? C>,� / �z r jL ❑ No one available for inspection: Time t `p AM/PM Re -Inspection required: Yes No When corrections have been made, call for re -inspection at 303-234- Date:- 61J // Z Inspector: /�(� DO NOT REMOVE THIS NOTICE *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding kh-inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturera€l"s installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer&#39;s technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201702146 PERMIT NO: 201702146 ISSUED: 06/19/2017 JOB ADDRESS: 4730 Otis ST EXPIRES: 06/19/2018 JOB DESCRIPTION: Residential reroof: Install Owens Corning Duration asphalt shingles 32 squares home 6/12 single layer *** CONTACTS *** OWNER (720)338-6135 ATNES ROGER G SUB (303)884-3947 Joshua Bryan 170143 JB Master Builder *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 7,500.00 FEES Total Valuation 0.00 Use Tax 157.50 Permit Fee 172.60 ** TOTAL ** 330.10 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding kh-inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturera€l"s installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer&#39;s technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201702146 PERMIT NO: 201702146 ISSUED: 06/19/2017 JOB ADDRESS: 4730 Otis ST EXPIRES: 06/19/2018 JOB DESCRIPTION: Residential reroof: Install Owens Corning Duration asphalt shingles 32 squares home 6/12 single layer I, by n signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that 1 am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include ali entities named within this document as parties to the work to be performed end the alrk to be performed is disclosed in this document ancy/o its' accorrpaiing approved plans and specifications. Signature TOWNER oCONTRACTOR (Circle one) Date 1. This,�permi' was ' ued b sed on the information provided in the permit application and accompanying plans and specifications and is subject tot a mpliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2, Thispermi all expire 3 5 days after the date of issuance regardless of activity. Requests for extension must be made in writing and rece wed p or to the date f expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Offic 1 a may be subj ct to a fee equal to one-half of the original permit fee. 3, If this it expires, a ew permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requiremen ees procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Buil mg Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change, of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of worlds-4ubject to field inspection. Signature of Chief Building Official Date REQUESTS NUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line. Antoinette Kulick Oil From: no-reply@ci.wheatridge.co.us Sent: Friday, June 9, 2017 12:53 PM To: Permits CommDev Subject: Online Form Submittal: Residential Roofing Permit Application Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. Permits are currently being processed within 3-5 business days, subject to change based on volume. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. \V THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email Address Do you have a signed contract to reroof this property? It will need to be provided at the time of permit pick-up. 4730 otis st Roger Atnes 7203386135 Field not completed. Yes L_ n r hrj CONTRACTOR INFORMATION Contractor Name Jared Searcy Contractor's License 170143 Number (for the City of Wheat Ridge) Contractor Phone 303 324 5880 Number Contractor Email Address jared.jbmasterbuilder@gmail.com (permit pick-up instructions will be sent to this email) Retype Contractor Email jared.jbmasterbuilder@gmail.com Address DESCRIPTION OF WORK Is this application for a Yes new permit for a residential roof? Are you re -decking the No roof? Description of Roofing owens corniong duration Material Select Type of Material: Asphalt If "Other" is selected Field not completed. above, describe here: How many squares of the 32 material selected above? Does any portion of the No property include a flat roof? If yes, how many squares Field not completed. on the flat roof? TOTAL SQUARES of all 32 roofing material for this project z Provide additional detail home 6/12 single layer here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract 7500 value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant Jared Searcy Email not displaying correctly? View it in your browser. 3 ,',C,REENF4 Advisor J B M AST ER B U I LB E R 9 i oq Exterior Restoration Property Owner ("Owner") �� C ,tom sfl Email � 'vL� 4cafC ' p- jV 11 ri Street ("The Property") �t`1 t� �'� i 7 City Ir�i �StateZip �Y`v�`3 Home Phone '7 Z 33_(0 SZ11 Work Insurance Company�Gi r,b1 gg - afprU�' (RCV) Replacement Cost Value: Claim # 0& K(,,;, G E-. S -- Doownwn Payment: tt ment: w (� Vvt Shingle Manufacturer Balance: Type Year Color Tear off d Layer(s) of asphalt/shake/tile Shingles Sh .athing_7/16" OSB_1.2" CDX Plywood Install Felt_15ib_301b Ice & Water Shield to code Install Metal Drop Edge to Code. Color 6 nail pattern on the shingle (+20mph wind resist) Valleys will be _Closed_Open Install new pipe jack boots as needed Install new vents as needed Install _LF of Vented Ridge Reflash Chimney Size Reflash Wall Abutment as needed if possible To Clean & Haul up all job related debris Magnetic Sweep of the yard for removal of nails 5 year workmanship warranty Estimated Date to begin the work Improvements in exchange for Insurance Scope Breakdown and SunMemental Proceeds. Owner authorizes JB Masterbuilder ("Contractor") to contact the Owner's Insurance company regarding damage to The Property. Owner under- stands that the Contractor will assist the Owner in repair and obtaining funds to repair Owner's Property. Owner authorizes Owner's Insurance Company to discuss all matters directly with Contractor. Owner agrees to provide Contractor with any and all insurance information, claim number, insurance loss data and adjuster's report provided to the Onwer by the Insurance Company pretaining the above claim number. Upon authorization of the Owner's Insurance Company, for a price agree- able to the Contractor, Owner agrees that the Contractor shall perform work prescribed by the Insurance Company's loss data sheet, or adjust- er's report which includes the estimate of repair (RCV) as set forth in the insurer's claim file plus any upgrades requested by the owner, or items necessary to pass inspection. Special Instructions: t t,r•:l>\ d �,%v- � .j, �;�,,.�4t '����.� vim.{ � G�� �� � 1 n Cx A C S Owner is obligated to pay only the deductible required by the Owner's Insurance Company plus any upgrades requested by the owner. Owner further agrees to endorse insurance checks payable to the Contractor or to pay the contractor an equal amount. Owner owes es the Contractor nothino in, the event the Insurance Comoanv does not authnrl7P th¢ rpn�irc Homeowner's! Homeowner's Contractor Sigl 4// Z-//. 7 -Z, / //� - - I INSPECTION RECO 'INSPECTION LINE: (303) 234 -5933 RD Occupancv/Tvpe Inspections will not be made unless this card is posted on the building site Call by 3:00 PM to receive inspection the following business day. L. t INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS J OB FOUNDATION INSPECTIONS DATE INSPECTOR INITIALS COMMENTS: Footings /Caissons Rough Electric — Rough Plumbing Stemwall / (CEG) Concrete Encased Ground Gas Piping Rough Mechanical Reinforcing or Monolithic Weatherproof / French Drain Sewer Service Lines Water Service Lines INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS SHOULD BE CALLEDAT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS. CONCRETE SLAB FLOOR Electrical (Underground) Heating (Underg ROUGHS Sheathing Lath / Wall tie Mid -Roof Electrical Service Rough Electric — Rough Plumbing Gas Piping Rough Mechanical Insulation Drywall Screw FINALS Electrical Plumbing Mechanical Roof Building Final Fire Department R.O.W & Drainage INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS SHOULD BE CALLEDAT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS. Parking & Landscaping "NOTE: ALL ITEMS MUST BE COMPLETED AND APPROVED BY PLANNING AND ZONING, BUILDING AND PUBLIC WORKS BEFORE A CERTIFICATE OF OCCUPANCY IS ISSUED. FINAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTE AUTHORIZATION OF A CERTIFICATE OF OCCUPANCY NOR PERMISSION FOR OCCUPANCY. v%,%�urANUY iMu I rERMITTED UNTIL CERTIFICATE OF OCCUPANCY IS ISSUED PROTECT THIS CARD FROM THE WEATHER ♦ i CITY 'OF WHEAT RIDGE Building Inspection Division (303)234 -5933 Inspection line (303) 235 -2855 Office • (303) 237 -8929 Fax INSPECTIINO� P Inspection Type: r Job Address: Permit Number: C3�7` (.9 ❑ No one available for inspection: Time { M M Re- Inspection required:_ Yes "When corrections have been made, call for re- inspection at 303 - 234-5933 Date: / --1 Inspector: nn ntnr 0=AAnt; A 1. s i CITY OF WHEAT RIDGE Building Inspection Division r (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION,NOTICE Inspection Type: AT' Job Address: 44--)317 c v Permit Number: (Z)CA El No No one available for inspection: Time /_i PM ..c' ~ Re-Inspection require. yj;;) No *When corrections have been made, call for re-inspection at 303-2345983 jT Date: f i ( Inspector: A Y DO NOT REMOVE THI~ NOTICE ♦ i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type:' Job Address: 4-73Z) f a. , Permit Number:? k' No one available for inspection: Time Q. ! AMY J Re-Inspection required: Yes No When corrections have been made, call for re-inspection at 303-234-5933 Date: 1 i t Inspector: E DO NOT REMOVE THIS NOTICE w s, City of Wheat Ridge ,rte , / Residential Roofing PERMIT - 093698 PERMIT NO: 093698` '.ISSUED: 10/27/2009 JOB ADDRESS:`. 473 0 OTIS ST :EXPIRES: 104/25/2010 DESCRIPTION: Reroof 29 sqs CONTACTS owner 303./922 6558 Brain Riley. w sub 303/425 -7531 John Borf itz 01-9.983 J &.K Roofing Inc PARCEL INFO e ZONE CODE: UA USE: 'UA SUBDIVISION:. 0369. BLOCK/LOT#: 0/ FEE SUMMARY ESTIMATED PROJECT VALUATION: 7,441.20 FEES Permit Fee 199.30 Total Valuation .00 i s Use :Tax 133.94 **.TOTAL ...333.24`` ` Conditions:` 6 nail installation mid roof inspection required: Board sheathing spaced more r than '.a 1/2 of an inch apart requires plywood overlay on entire roof. Ice and water shield:. required from eave edge to 2' inside exterior walls.` ' ***Contractor/Property owner shall provide ladder(s) secured in place for inpsections. Subject to field inspection, I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all z' measurements shown, and allegations made are accurate; that I have read and agree to abide: by all conditions printed on this " application and that I assume full responsibility for compliance with the Wheat"Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for work under this permit. Plans subject to field inspection. i0-27 0R signature of ntractor/owner .`date 1. This permit was issued in accordance with the provisions set forth: in your application and is subject to the `laws of the State of Colorado and to the zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable aJ ordinances of the City. r= 2. This permit shall expire 180 days from the issue date. Requests for an extension must be received prior to expiration date. An extension may:. be granted: at the discretion of the Building Official. 3. If this permit expires, 'a new permit may be acquired for a fee of one-half the amount normally required, provided no ~z 'changes have been or will be made in the 'original plans''. and specifications and any suspension or abandonments has not exceeded one '(1) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall be paid for anew permit. 4. Not work of any manner shall be done that will change the natural flow of water causing a drainage problem. 5 Contractor shall notify the Hm lding Inspector twenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card before proceeding with successive phases of the job. 6. The issuance of a permit or the approval of drawings and specifications shall not be construed to be a permit for, nor anapproval of, any violation of 'the provisions of the building codes or any other ordinance, law, rule or regulation..': All plan review s subject to field inspections. R, Signature Building :Official date INSPE ION REQUEST LINE: (303)234-5933 2BUILDING OFFICE: (303)235-2855 REQUETS MUST BE MADE BY 3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. ~oF"'"E°TRa City of Wheat Ridge Building Division 7500 W. 29th Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-235-2857 oLOanoo _ Inspection Line: 303-234-5933 Building Permit Application Date: Plan P,Qrmit r C ~ - is ' y ~b C4-S S1- Property Owner (please print): tje l o,y~,. I-< Mailing Address: (if different than property address) Address: ~g yx Phone: 3 °3 0,6 SSg City, State, Zip: CO Oo~3 I-J Contractor License t cl ~g3 Phone: L4DS - ? 5 3/ Electrical City License Company: Plumbing City License Mechanical City License Company Company: Exp. Date: Exp. Date: Exp. Date: Approval: Approval: Approval: Use of space (description): ~ESCSJ~ Construction Value: $ (as calculated per the Building Valuation Data sheet) -pay- S'~t vi ~-poCCJR29-- Plan Review (due at time of submittal): $ 0 Sq. Ft./L.Ft added: Squares BTU's Gallons Amps OWNERICONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurementf3 shown, and allegations made. are accurate; that 1 have read and agree to abide by all conditions printed on this application and that .f-assume full responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for work under this permit. Plans subject to- action. CIRLCE ONE:: (0 ER) CONTRACT or PERSONAL REPRESENTATIVE of (OWNER) (CONTRATOR) \ '_n Ia PRINT NAME: C J. ..SIGNATURECQ.tA~s.o~'K.Date: Bldg Valuation: $ ✓DEPARTMENT OF COMMUNITY DEVELOPMENT 7500 WEST 29tn AvENUE BUILDING INSPECTION DIVISION 237-6944 ExT. 255 P.O. eox 63e CITY OF WHEAT RIDGE, COLO. PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND RECEIPTED BELOW. PERMIT N0. M91#16368 . S~ `S . _ JOB ADDfiESS v~ OWNER CONTRACTOR ~ 'P'"~"er n 5n✓~ YC~ ADDRESS ~-7 3 ' t' S ADORESS 4 3 G I CJ t ~~..e PHONE 3 ~L - L S~DiJ ZIP CODE ITY ZIP CODE CONTRACT PRICE $ -z- I C ounuc Q Ia 1 If:FNCF NCI. I `'I ~ nA❑ - TYPE G I Woll❑ p❑ Proieefin Othor S or D Faee SIGNS rou . 2. MATERIAL ❑ ❑ T Total Squan Feef Parmit No Eieet No 3. ILLUMINATION Yes 4. SET BACK FROM PROPERTY LINE N (Speeity which is front) YM _ ❑ S_ E ❑ _ W ❑ ❑ . Zone_ . ApDroved, ZOne Inspsctor Disopprwed 1. TYPE Solid0 More Than 80% Opan[j Z. MATERIAL Lots Thon BO% Open Hdpht FENCES 3 SET BACK FROM PROPERTY LINE N (SVecity wnich ia front) _ ❑ S_ E ❑ _ W ❑ ❑ Zons_ Appraed,Zons Impseta Disoporovad n I. Z OTHER ' 3 . DRAW SKETCH OR SHOW BELOW,THE FENCE, SIGN, OR OTHER STRUCTURE, GNINv" 04STANCES FROM PROPERTY LINES. (SETBACKS OR PROJEGTIONS INCIUDEA) ~ SPECIFV NORTH STREET NAME SHOW DISTANCES FROM THE MAIN BUIIDING TQADJOINING NOUSES, STREETS, AND PROPERTY LINES; ON IRREGUTAR LATS, SNOW LEAST DISTANCE TO PROPERTY LINES, NOT MAXIMUM OR AVERAGE DISTANCE. APPLICATION FOR PLUMBING; ELECTRICAL; MECHANICAL PERMIT THIS APPIICATtON WILL BECOME A PERMIT TO PERFORM THE INDICATED WORK ONLY UPON VALIDATION BY THE BUILDING INSPECTION DIVISION. xaut7 Wu L EXPIRE 60 DAYS FROM DATE OF ISSUANCE !F WORN IS NOT STARTED WITHlN THAT TIME. ELECTRICAL PERMIT P~UMBING PERMIT MECHANICAL PERMIT STATE LICENSE N0. STATE LICENSE N0. ALUMINUMWIREUNDERSIZE8ILLEGAI FLOOR BSM IST 2ND 3RD 4TH N0. Ft1ELC'RCISOn*GcidlPropone ElxSolw IR - BTU ~,p WATER CLASET FORCED A TEMPORARY METER WASH BOWL HOT WATER - BTU NEW SERVICE AMPS BATH TUB STEAM - BTU CHANGE SERVICE-AMPS SHOWER AIR CONDITIONING-BTU LIGHTING SINK OTHER HEATING GARBAGE DISP REFRIGERATION SYSTEM POWER SUB-CIRCUITS WATER HEATER ReHi aront Group U?ILITY(RANGE,DISPoSER,ETC) AUTO. WASHER Poundf Ctwr e DISH WASHER AUTOMATIC SPRINKLER SYSTEM FI%TURES WIRING MOTORS 8 CONTROLS FLOOR DRAIN ELEVATOR SIGNS URINAI TRANSFORMERS d RECTFIERS SEWERS ADDITION TO OLD WORK OTHER MOTORS OVER I HP TOTAL FIXTURES I hareby ucknowled9e ihot this aDDllca- fion is correct ond understond thot I eannot atart this projeet until this oDGli- eation ie oDProved. I sholl comply with tha lows of the State of Colorado and 10 fhe 2oninp ReQulations ond Buildinp Code offhe City of Wheai Ridqe. Any violation of ihe above terms will cause inunediot.e revocotion of this Oermit PERMIT FEE Q0 USE TAX .3cY. 6~ I TOTAL FEE $/n J,bo? I CHIEF BUILDING IKSPECTOR,C/itJy of Wheat Ridge Date Issued NOT VALID UNIESS RECEIPTI ~,LCey1~ ~31~/OP 0/-03-` ~ 7 r,~~ ~y309 CALL 237-8944 EXT. 255 24 HOURS IN ADVANCE FORINSPECTIONS C . /1i19 /6368 v INSPECTION TICKET ~ BUILDING DEPARTMENT dos /1~2~ ~1~5 C~ 237-6944 Ext. 255 ADDRESS °~r I J ~J~ J CITY OF WHEAT RIDGE DATE: D' 'v ' BLDG. PERMIT# ~(l'/!UO PERMITk BLDG. CONTR. ~~~1~ ~2~ `+i~✓ SUBCONTRACTOR DATE INSP. REQ. L/` 0 O1 TYPE OF INSP. ~rol'~ INSPECTION MADE REMARKS 2 ~ INSPECTION TICKET JOB (ADDRESS DATE: 01-09-91 BLDG. PERMITB PERMITB Mql 'i63Ec~ BLDG. CONTR SUBCONTRACTOR 4-V.e-'~~~6~`` DATE INSP. REQ. 9-91 . TYPE OF II INSPECTIO REMARKS W.R.FORM 619 • : Correction Notice Job Located at You are hereby notified to correct the foregoing violations. When corrections have been made, call for inspection. Date Inspector for Building Dept. DO NOT REMOVE THIS TAG FORM WR6-i2 /9 9• /