HomeMy WebLinkAbout7960 Melrose DriveINSPECTION RECORD Occupancy/Typ
INSPECTION ONLINE FORM: hftp://www.ci.wheatridge.co.us/inspection
r INSPECTION REQUEST LINE: (303) 234-5933
Inspections will not be performed unless this card is posted on the project site.
"Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day."
Inspector Must Sign ALL Spaces pertinent to this project
Foundation Inspections Date
Inspector Comments
Initials
Pier
Wall Sheathing
Concrete Encased Ground (CEG)
Foundation / P.E. Letter
Mid -Roof
Do Not Pour Concrete 'Prior To Approval Of The Above Inspections
Underground/Slab Inspections Date Inspector Comments
Initials
Electrical
Sewer Service
Plumbing
Do Not Cover Underground or Below/ln-Slab Work Prior To Approval Of The Above Inspections
Rough Inspections
Date
Inspector
Initials
Comments
Wall Sheathing
Inspections from these entities should be requested
one week in advance. For landscaping and parking
inspections call 303-235-2846. For ROW and drainage
inspections call 303-235-2861. For fire inspections
contact the Fire Protection District for your project.
Mid -Roof
Floodplain Inspection (if applicable)
Lath / Wall Tie
Fire Inspection / Fire Protection Dist.
Rough Electric
Final Electrical
Rough Plumbing/Gas Line
Final Plumbing
Rough Mechanical
Final Mechanical
Rough Framing
Roof
Rough Grading
Final Window/Doors
Insulation
Final Building
Drywall Screw / Nail
NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate
of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy.
Final Inspections
Date
Inspector
Initials
Comments
Landscaping & Parking / Planning Dept.
Inspections from these entities should be requested
one week in advance. For landscaping and parking
inspections call 303-235-2846. For ROW and drainage
inspections call 303-235-2861. For fire inspections
contact the Fire Protection District for your project.
ROW & Drainage / Public Works Dept.
Floodplain Inspection (if applicable)
Fire Inspection / Fire Protection Dist.
Final Electrical
Final Plumbing
AtA, ii -j 0\
Final Mechanical
Kq Cgi_n kvloi4—
Roof
Final Window/Doors
Final Building
NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate
of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy.
*For low voltage permits — Please be sure that rough inspections are completed from the Fire District and electrical low voltage
by the Building Division.
Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued
Protect This Card From The Weather
UA la"4,0,wu
The City of Wheat Ridge
Third Party Form Check List
Property Address 7960 Melrose Drive
Permit Number 201704539
Permit Issued Date 07/20/2017
Owner Information
Property Owner Information Suzanne Fitzpatrick
Property Owner Address Same as above
Inspector Information
Inspection Company Certified Building Consultants
Inspector Name Kraig Stanforth
Inspector Contact info. 720-940-1180 KStanforthCBC0.gmail.com
Inspector Statement of Acknowledgement
"1 hereby acknowledge the roof I am inspecting is 6/12 or over. All roofs that are under
6/12 must be inspected by the City of Wheat Ridge Building Department.
*1 hereby acknowledge the roofing system for the referenced building has been
inspected and found to be in compliance with the minimum requirements of the 2012
IRC and 2012 IBC as well as the City of Wheat Ridge Policies and Procedures and
manufacturer's recommendations and sp cifications. I
Inspector: t Date:
Pro a Owner Statement of Acknowledgement
*1 hereby acknowledge that I am the owner of the building referenced above and I give
my consent for the listed third -party inspection company to perform my roof inspection
in lieu of the City of Wheat Ridge BL#Ijing Di ision inspection. 1
Property Owner/Agent: Date:'
11 V1
This original document, as well as Me roofing checklist, must be submitted to the Chief
Building Official within seven days of the final inspection.
Drop off in person Submit via Email
Permit Counter 2nd Floor Kcook _ci.wheatridge.co.us
7500 W. 291 Ave
Wheat Ridge, CO 80033
CBC Wheat Ridge Roof Inspection Packet Page 1 of
N/A ❑ Pass ❑ Fail Metal roof shingles shall not be installed on slope less than 3:12
N/A ❑ Pass ❑ Fail Metal valley flashing shall be the same material as roof
N/A ❑ Pass ❑ Fail Metal valley flashing shall extend a min. of 8" from the
centerline with a min. of 3/4 " high splash diverter rib built-in at
the flow line with the sections overlapping a min. of 4"
Tile Roof Requirements
rz N/A ❑ Pass ❑ Fail Clay and concrete tile shall have a min. 2-1/2:12 slope
N/A ❑ Pass ❑ Fail Slopes 4:12 and under require double underlayment
CBC Wheat Ridge Roof Inspection Packet Page 2 of
5
The City of Wheat Ridge
Inspection Check List Notes
Mid -Roof
Roof Inspection
❑
N/A
' Pass
❑
Fail
Structural roof components
❑
N/A
Pass
❑
Fail
Verify that no more than 2 layers of shingles exist
❑
N/A
Pass
❑
Fail
Flashing for roof and walls
❑
N/A
❑ Pass
❑
Fail
If new sheathing is installed, verify that it is listed in the permit
description (Valuation must be adjusted)
N/A
❑ Pass
❑
Fail
Verify sheathing nail pattern (see Policy and Procedures)
N/A
❑ Pass
❑
Fail
Crickets and saddles where needed
❑
N/A
X—"f Pass
❑
Fail
Verify vent must have boot same gauge as pipe
❑
N/A
Pass
❑
Fail
Verify vent caps
❑
N/A
Pass
❑
Fail
Verify no flashings are damaged or rusted
N/A
❑ Pass
❑
Fail
Step flashing shall be min. of 44 piece per shingle
N/A
❑ Pass
❑
Fail
Verify scuppers allow for proper drainage
❑
N/APass
❑
Fail
Ice and water shield 2' in heated wall spaces
❑
N/A
Pass
❑
Fail
Underlayments must follow 2012 IRC/2012 IBC
❑
N/A
Pass
❑
Fail
Verify roof slope for proper damage
❑
N/A
Pass
❑
Fail
Dripedge shall have min. of 2" overlap
❑
N/A
Pass
❑
Fail
Dripedge should extend down min. 2" past roof deck
❑
N/A
tie Pass
❑
Fail
Dripedge shall be mechanically fastened 12" OC
❑
N/A
/�A Pass
❑
Fail
9 oofing shall not be applied to roof slopes less than
2.12 slo_p.P.Axception, detached garages, patios, carports, open
ree sides with min. slope of 1:12
N/A
❑ Pass
❑
Fail
Above roof insulation R-25
N/A
❑ Pass
❑
Fail
Below roof residential R-38
N/A
❑ Pass
❑
Fail
Below roof commercial R-32
❑
N/A
14ass
❑
Fail
Modified Bitumen, EPDM, TPO min. slope 1/4:12 slope must be
installed in accordance with the manufacturer's specifications.
Must have manufacturer's letter of warranty with the address
on the letter for final inspection
Metal Roof Shingles Requirements
N/A ❑ Pass ❑ Fail Metal roof shingles shall not be installed on slope less than 3:12
N/A ❑ Pass ❑ Fail Metal valley flashing shall be the same material as roof
N/A ❑ Pass ❑ Fail Metal valley flashing shall extend a min. of 8" from the
centerline with a min. of 3/4 " high splash diverter rib built-in at
the flow line with the sections overlapping a min. of 4"
Tile Roof Requirements
rz N/A ❑ Pass ❑ Fail Clay and concrete tile shall have a min. 2-1/2:12 slope
N/A ❑ Pass ❑ Fail Slopes 4:12 and under require double underlayment
CBC Wheat Ridge Roof Inspection Packet Page 2 of
5
The City of Wheat Ridge
Inspection Check List Notes
Mid -Roof
Notes
Company Name: Certified Building
Inspector Signature: /1
Date of Inspection:
CBC Wheat Ridge Roof Inspection Packet Page 3 of
5
The City of Wheat Ridge
Inspection Check List (dotes
Final Roof
Roof Inspection
❑ N/A
Pass
❑
Fail
Structural roof components
❑ N/A
/�° Pass
❑
Fail
Verify that no more than 2 layers of shingles exist
❑ N/A
!� Pass
❑
Fail
Flashing for roof and walls
❑ N/A
Pass
❑
Fail
Structural roof components
❑ N/A
Vol" Pass
❑
Fail
If new sheathing is installed verify that it is listed in the
permit description (Valuation must be adjusted)
N/A
❑ Pass
❑
Fail
Verify sheathing nail pattern (See Policy and Procedures)
f/�L_' N/A
❑ Pass
❑
Fail
Crickets and saddles where needed
❑ N/A
hd Pass
❑
Fail
Verify B vent must have boot same gauge as pipe
❑ N/A
i- Pass
❑
Fail
Verify vent caps
❑ N/A
/ Pass
❑
Fail
Verify no flashings are damaged or rusted
N/A
❑ —Pass
❑
Fail
Step flashing shall be min. of 4x4 piece per shingle
�IV/A
❑ Pass
❑
Fail
Verify scuppers allow for proper drainage
❑ N/A
ass
❑
Fail
Ice and water shield 2' in heated wall spaces
❑ N/A
ass
❑
Fail
Underlayments must follow 2012 IRC/2012 IBC
❑ N/A
Pass
❑
Fail
Verify roof slope for proper drainage
❑ N/A
hd Pass
❑
Fail
Dripedge shall have min. 2" of overlap
❑ N/A
Pass
❑
Fail
Dripedge should extend down min. 2" past roof deck
❑ N/A
Pass
❑
Fail
Dripedge shall be mechanically fastened 12" OC
❑ N/A
, Pass
❑
Fail
90 LB roll roofing shall not be applied to roof slopes less than
2:12 slope: Exception, detached garages, patios, carports, open
on three sides with min. slope of 1:12
❑ N/APass
❑
Fail
Modified Bitumen, EPDM, TPO min. slope 1/4:12 slope must be
installed in accordance with the manufacturer's letter of
warranty with the address on the letter for final inspection
Metal Roof Shingles
Requirements
N/A ❑ Pass ❑ Fail Metal roof shingles shall not be installed on slope less than 3:12
N/A ❑ Pass ❑ Fail Metal valley flashing shall be the same material as roof
N/A ❑ Pass ❑ Fail Metal valley flashing shall extend a min. of 8" from the
centerline with a min. of 3/4 " high splash diverter rib built-in at
the flow line with the sections overlapping a min. of 4"
Tile Roof Requirements
/A ❑ Pass ❑ Fail Clay and concrete tile shall have a min. 2-1/2:12 slope
N/A ❑ Pass ❑ Fail Slopes 4:12 and under require double underlayment
CBC Wheat Ridge Roof Inspection Packet Page 4 of
5
The City of Wheat Ridge
Inspection Check List Notes
Final Roof
Notes
Company Name: Certified Building Consultants
Inspector Signature:
Date of Inspection:'"
CBC Wheat Wheat Ridge Roof Inspection Packet Page 5 of
5
City of Wheat Ridge
Residential Roofing PERMIT - 201704539
PERMIT NO: 201704539 ISSUED: 07/20/2017
JOB ADDRESS: 7960 Melrose DR EXPIRES: 07/20/2018
JOB DESCRIPTION: Residential Re -roof to install MULE HIDE MODIEFIED BITUMEN ROLLED asphalt
shingles with 24SQ
HOUSE 1.5/12PITCH 1STORY
*** CONTACTS ***
OWNER (303)467-0387 FITZPATRICK C SUZANNE
SUB (720)536-8870 Chris Falasco 160159 Endeavor Exteriors
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 11,452.24
FEES 1
Total Valuation 0.00
Use Tax 240.50 _
Permit Fee 236.00
** TOTAL ** 476.50 —�
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) requires an approved inspection
prior to installation of ANY roof coverings and is require on the entire roof when spaced
or board sheathing with ANY gap exceeding one half inch exists. Asphalt shingles are
required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and
water shield is required. Eave and rake metal is required. A ladder extending 3 feet above
the roof eave and secured in place is required to be provided for all roof inspections.
Roof ventilation is required to comply with applicable codes and/or manufacturer
installation instructions, whichever is more stringent. In order to pass a final inspection
of elastomeric or similar type roof coverings, a letter of inspection and approval from the
manufacturer technical representative stating that "the application of the roof at (project
address) has been applied in accordance with the installation instruction for (roof
material brand name) roof covering" is required to be on site at the time of final
inspection.
Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd
party inspection report will be collected at final roof inspection performed by City of
Wheat Ridge. If report is not available the final inspection will not be completed.
City of Wheat Ridge
Residential Roofing PERMIT - 201704539
PERMIT NO: 201704539 ISSUED: 07/20/2017
JOB ADDRESS: 7960 Melrose DR EXPIRES: 07/20/2018
JOB DESCRIPTION: Residential Re -roof to install MULE HIDE MODIEFIED BITUMEN ROLLED asphalt
shingles with 24SQ
HOUSE 1.5/12PITCH 1STORY
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applica le building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorzed
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this permit. 1 further attest that I am leg�ally authorized tonclude all entities named within this document as parties to the work to be
performed and that all work to, be perform] is disclosed in this document and/or its' accompanying approved plans and specifications.
Signature of OWNERor CONTRACTOR (Circle one) Date c
1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing; and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the originalpermit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4, No work of an manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuTer
ranting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applicabany ordi a�r regulation of this jurisdiction. Approval of work is subject to field inspection.
�r1l�t� at.A . J
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Dan Schultz e;? 01 -7 d
From: no-reply@ci.wheatridge.co.us
Sent: Wednesday, July 12, 2017 9:40 AM
To: Permits CommDev
Subject: Online Form Submittal: Residential Roofing Permit Application
Categories: Gina
Residential Roofing Permit Application
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
your contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a Yes
residential roof?
How many dwelling units Single Family Home
are on the property?
PROPERTY INFORMATION
Property Address
Property Owner Name
Property Owner Phone
Number
Property Owner Email
Address
7960 Melrose Drive
Suzanne Fitzpatrick
303-467-0387
Field not completed.
q�4 )
Do you have a signed Yes
contract to reroof this
property?
It will need to be
provided at the time of
permit pick-up.
CONTRACTOR INFORMATION
Contractor Name
Contractor's License
Number (for the City of
Wheat Ridge)
Contractor Phone
Number
Endeavor Exteriors
160159
720-536-8870
Contractor Email Address production@endeavorexteriors.com
Retype Contractor Email production@endeavorexteriors.com
Address
DESCRIPTION OF WORK
Are you re -decking the No
roof?
Description of Roofing
Material
Select Type of Material
If "Other" is selected
above, describe here:
Mule Hide - Modified Bitumen
Rolled
Modified Bitumen
How many squares of the 24
material selected above?
Does any portion of the Yes
property include a flat
roof?
If yes, how many squares 24
on the flat roof?
TOTAL SQUARES of all 24
roofing material for this
project
Provide additional detail House. 1.5/12 pitch. 1 -story
here on the description of
z
work. (Is this for a house
or garage? What is the
roof pitch? Etc)
Project Value (contract 11,452.24
value or cost of ALL
materials and labor)
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this Yes
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
Name of Applicant Alex Knoll
Email not displaying correctly? View it in your browser.
3
CLIENT AGREEMENT
EDEWEXTERIORS
T'
7808 Cherry Creek South Dr. Suite 401, Denver, CO 80231 BBB.I
Office: (720) 536-8870 1 www.TheEndeavorTeam.com I Licensed & Insured
Client Email Date
Street Address Endeavor Re
City, State, Zip
L, kea i
Insurance Company I Insurance Agent
Home Phone Work Phone Claim #
3Gs'-kr7-C,
Mortgage Company (only if mortgage company is present on payment)
Lender Loan # ❑ Borrow Authorization Form Signed
❑ Photo of Mortgage Check Taken
Limited Lifetime Labor Warranty 0 Gen. LiabilitylWorkers' Comp r BBB Accredited 0 No Deposit Required
ROOF SCOPE: CFullPartial Repair WINDOWS: Full Pa rtial�...�2epair PAINT: Full Partial Repair
Brand: Brand: Brand Brand
Color: Mod or Color(s)---'
Metal Color.
Felt: � tet, h
15
Sr ni,eFtc
GUTTERS: Full Partial
UColo
-- ❑G
Downsp
outs
SIDING: Full Partial
I Brand
Style:
Payment Terms
Client understands and agrees their insurance company will not pay the deductible
amount or any upgrade client is opting to pay for. Client's expense for these items are:
First payment will be collected when work begins or material delivered - whichever
occurs first. This is partial compensation for labor and materials. This amount is:
Work to be completed according to the specifications in the total amount of:
OTHER:
$ )U/ilk,
$ 7Z�0 .1
$
5 L Z,?
❑ Balance due upon substantial completion,) CASH SALE []Contingency Agreement (Contingent upon Ins. approval)
❑ INSURANCE AGREEMENT. The client authorizes Endeavor Exteriors to represent their best interest in pursuit of full replacement costs for damages believed
to be covered under homeowner's insurance and allows Endeavor Exteriors to deal directly with the insurance company regarding this claim. This contract does not obligate
the client to Endeavor Exteriors until the claim is approved by the insurance company, and accepted by Endeavor Exteriors. Upon approval of claim. Endeavor Exteriors
will complete all specified work at a price agreeable to the insurance company (RCV) and Endeavor Exteriors with no additional cost to the client, except for the deductible
Ordinance and Law (supplemental) items may increase the original (RCV) amount Final agreed upon once will become the final contract once. and request that all payments
be made payable to Endeavor Exteriors Inc- Endeavor Exteriors will not collect payment until the work has begun or materials have been delivered.
'Credit card payments are not accepted on insurance claims'
I (we) agree, by signing below, to all the co tr t conditions on both front and back, oft is agreement
Client Signature: Date of Acceptance:
Client Signature: Endeavor Signature:
The terms on the back of this contract have bee nrev}ewe4-"h me and I (we) agree to them
Client Initials: I`-
1. If the client plans to use the proceeds of property and casualty insurance policy pursuant to part I of
article 4 of title 10, C.A.S., to pay for the roofing work, pursuant to section 6-2-105, the roofing contractor
cannot pay, waive, rebate, or promise to pay, waive, or rebate all or part of any insurance deductible
applicable to the insurance claim for payment for work on the covered residential property.
2. All Contracts subject to approval by Endeavor Exteriors financial department.
Contract price is valid for thirty (30) days.
-I. 1:ndeavor Extcriors reserves the right to perform specified work in accordance with generally accepted
construction guidelines, while adhering to local codes in effect at the time of contract.
5. All checks must be made payable to: Endeavor Exteriors.
0. All excess materials remain the property of Endeavor Exteriors.
Client is responsible for Homeowner's Association approval of products and colors.
8. Client acknowledges Endeavor Exteriors as a general contractor, as such Endeavor Exteriors will be
entitled to ten percent (10%) overhead, and ten percent (10%) profit, (O&P) if approved by the insurance
company, ll this project is part of a claim.
9. An account is defined as past due when 10 days have elapsed from the date of completion of work. Past
due accounts will earn interest at a rate of one and one-half percent (1.5%) per month or eighteen percent
(18%) annually. If Endeavor Exteriors is required to turn the matter over to an attorney for collection, the
client also agrees to pay all costs incurred, including attorney's fees.
I t). Should default of payment occur on this contract, Endeavor Exteriors reserves the right to place a
mechanic's lien on the clients' property.
IL Endeavor Exteriors shall not be held liable for failure of performance due to labor controversies, strike,
fire, hail, weather, inability to obtain material from usual source, or any other circumstance beyond the
control of the company.
12. Our standard workmanship warranty for roofing is non -transferable limited lifetime, and one (1) year for all
other trades, and the company will provide a service call for roof inspection, as long as the client owns the
property.
I Endeavor Exteriors is not responsible for any leaks or water damage below the roolline caused by
excessive wind, ice oi- hail during the period of the warranty.
1-1. Endeavor Exteriors shall refund any deposit if this contract is cancelled within 72 hours (3 days).
15. If this contract is cancelled by the client, after three (3) or more days of execution, the client agrees to
pay Endeavor Exteriors twenty percent (20%) of the contract price, set by the insurance company, only if
materials have been delivered or work has been performed, as liquidated damages. This payment is not a
penalty, but is fair and just compensation for services rendered to that point.
I6. The homeowner may cancel this contract within 72 hours if the insurer has denied, in whole or part, the
homeowners claim that relates to this contract.
17. While we make every effort to ensure there are limited consequences of construction, Endeavor Exteriors
will not be held responsible for slight scratching or denting of gutters, droplets of oil in the driveway,
cracks in concrete, or damage to plants and trees. Furthermore, Endeavor Exteriors will not be held
responsible for exterior damages such as deteriorated trim pieces, crown molding, stucco, solar panels,
evaporative coolers, existing skylights, or interior damage such as falling dust and debris, cracked plaster,
sheet rock or nail pops, as a result of normal re -roofing.
1 S. Replacement or repair of the deteriorated decking, fascia boards, swamp coolers, ventilators, chimneys,
counter flashing, or any other work completed for the homeowner not explicitly stated in this contract,
are not included in quoted price and will be charged as extra on a time and material basis.
19. lindeavor Exteriors holds the right to photograph all projects in which it is invloved, and the right to
publish throughout all Endeavor Exteriors' social media outlets.
INSPECTION RECORD OccupancV/TVpe
INSPECTION LINE: (303) 234 -5933
Inspections will not be made unless this card is posted on the building site
Wi�oa 4 Call by 3:00 PM to receive inspection the following business day.
O kT'V Ai 1 141
INSPECTOR MUST SIGN LL SPACES PERTAINING TO THIS JOB
FOUNDATION INSPECTIONS
DATE
INSPECTOR
INITIALS
COMMENTS:
Footings /Caissons
Stemwall / (CEG) Concrete
Encased Ground
b
-
Electrical Service
Reinforcing or Monolithic
— 6
Rough Electric
Weatherproof / French Drain
Rough Plumbing
Sewer Service Lines
Gas Piping
Water Service Lines
-
Rough Mechanical
INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS
SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS.
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED
CONCRETE SLAB FLOOR
Electrical (Underground)
"NOTE: ALL ITEMS MUST BE COMPLETED AND APPROVED BY PLANNING AND ZONING, BUILDING AND PUBLIC WORKS BEFORE A
CERTIFICATE OF OCCUPANCY IS ISSUED. FINAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTEAUTHORIZATION
OF A CERTIFICATE OF OCCUPANCY NOR PERMISSION FOR OCCUPANCY.
Plumbing (Underground)
Heating (Underground)
�Iil�`[�ri� •ld \IN �iTi17�1: fil�_RiPly: R9:13tl. �.`IrN.ly�
ROUGHS
Sheathing
Lath I Wall tie
Mid -Roof
b
-
Electrical Service
Roof
— 6
Rough Electric
Building Final
Rough Plumbing
Fire Department
Gas Piping
R.O.W & Drainage
-
Rough Mechanical
INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS
SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS.
Parking & Landscaping
ABUVE INSPECTION5 TO BE SIGNED PRIOR TO PROCEEDING
Framing
Insulation
Drywall Screw EE
FINALS
Electrical
Plumbing
Mechanical
-
Roof
— 6
Building Final
Fire Department
R.O.W & Drainage
INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS
SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS.
Parking & Landscaping
"NOTE: ALL ITEMS MUST BE COMPLETED AND APPROVED BY PLANNING AND ZONING, BUILDING AND PUBLIC WORKS BEFORE A
CERTIFICATE OF OCCUPANCY IS ISSUED. FINAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTEAUTHORIZATION
OF A CERTIFICATE OF OCCUPANCY NOR PERMISSION FOR OCCUPANCY.
OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF OCCUPANCY IS ISSUED
PROTECT THIS CARD FROM THE WEATHER
e , A CITY OF WHEAT RIDGE -
Bung Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: f-I i\
Job Address: c r-6
Permit Number: Da
El No one available for inspection: Time i 1 R QM
Re-Inspection required: Yes_ No
*When corrections have been made, call for re-inspection at 303-234-5933
Date:` Inspector:
DO NOT REMOVE THIS N TICE
r , I
♦ i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303).235-2855 Office • (303) 237-8929 Fax
INSPECTION VOTICE
Inspection Type: ✓
Job Address:
Permit Number: f (`kLl
z
❑ No one available for inspection: Time AM &
Re-Inspection required: Yes
When corrections have been made, call for re-inspection at 303-234-5933
Date: Inspector: y ~Oma
DO NOT REMOVE THIS ~11OTICE
E
i
of ""~rq City of Wheat Ridge Building Division
~m 7500 W. 29th Ave., Wheat Ridge, CO 80033
Office: 303-235-2855 * Fax: 303-235-2857
°OLOano° Inspection Line: 303-234-5933
Property Owner (please
Mailing Address: (if different than property address)
Address: S (~Q
`-,,J
Contractor License
Electrical City License #
Company:
Exp. Date:
Phone:
Date:
Plan
?ermit It.
Plumbing City License
Company
Exp. Date:
Use of s ace descri tion): ~~l 1-v✓~
jhly~ iT/~ tAe~`
YYkl> - r,-
Mechanical City License
Company:
Exp. Date:
e?
Construction value: $ 0
(as calculated per the Building Valuation Data sheet)
Plan Review (due at time of submittal): $
Sq. Ft./L.Ft added: Squares BTU's Gallons Amps
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
f hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances,
rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements-shown, and
allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that l assume full
responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for work
under this permit. Plans subject to field inspection. -
CIRLCEONE. (O NER TRACTOR) or PERSONALREPRTATIV o oWNE (CONTRATOR)
PRINT NAM ~~.F;.'~ {"IC)t - SIGNATURE: 7 Date: to
Building Permit Application
DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : 13932
BUILDING INSPECTIONLINE - 303-234-5933
Date : 5/30/02
CITY OF WHEAT RIDGE
7500 WEST 29tH AVENUE
WHEAT RIDGE, CO 80215 - (303-235-2855)
Property Owner. GENE FLETCHER
Property Address : 7960 MELROSE DR
Phone : 403-1540
Contractor License No. : 21301
Company : Northern Electric, Inc.
Phone : 428-6969
OWNER/CONTRACTOR SIGNATURE OF U'NDERSTANDING AND AGREEMENT
Construction Value : $1,600.00
I hereby certiTy that the setback distances proposed by this permit application are accurete, and
Pefmit Fee : $57.05
do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or
Plan Review Fee : $0.00
covenants, easements or restrictions of record; that all measurements shown, and allegations
made are accurate; that I have read and agree to abide by all wnditions printed on this
Use Tax : $19.20
application, and that I assume full responsibility for compliance ith the Wheat Ridge Building
u
Code (U.B.C.) and all other applicable Wheat Ri~rdiryfn~for work under this permit.
TOt81 : $76.25
(OWNER)(CONTR4CTOR) SIGNED (V~~~DATE O~
U se
Description : 200 AMP SERVICE C
~
BUILDING DEPARTMENT USE ONLY
~ WWWWO.e.,, SIC : Sq. Ft. :
Approval:
Zoning :
Approval :
PAO~ ~~~OW,
Approval:
Occupancy : Walls : Roof : Stories : Residential Units :
Electrical License No : 21301 Plumbing License No : Mechanical License No :
Company : Northern Electric, Inc. Company : Company :
Expiration Date : 2/28/03
Approval : OKIKS Expiration Date : Expiration Date :
Approval: Approval:
(1) This permit was issued in accortlance with the provisions set forth in yopur application and is subject to lhe laws ot the State of Coloratlo and to the Zoninq
Regulations antl Building Code of Wheat Ridge, Colorado or any other applicable ortlinances of the Ciry.
(2) This permit shall expire if (A) the work authorizetl is not commenced wi[hin sinty (60) days from issue date or (B) the building authorized is suspended or
abandoned for a period of 720 days.
(3) If this permit expires, a new permit may be acquired for a fee of one-half ihe amount normally requireQ provided no changes have been or will be made in lhe
original plans and specifcations and any suspension or abandonment has not exceetled one (1) yeac If changes are made or if suspension or abandonment
exceeds one (1) year, full tees shall be paid for a new permit.
(4) No work of any manner shall be done that will Change the natural Flow otwater causing a dreinage problem.
(5) Contrector shall notify the Building Inspector lwenty-four (24) hours in advance for all inspections and shall receive written approval on inspedion card before
Xy'_Is ung with successive phases of the job.(8) s ancof1,
rmit or the approval of drawings antl specifications shall not be construed ro be a permit for, nor an approval of, any violation of the
s n/'G~4 ` ing g codes or any other oYdinance, law, rule or re9ulation.
Chief Buildi Inspector
DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Nwnber:
OF WHEAT
~ BUILDING INSPECTION LINE - 303-234-5933 Date:
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENiJE
WHEAT RIDGE, CO 80215 - (303-235-2855)
~aC OR Aa~
AMU" TTON
PropertyOwner: Crcn e 'T-AG2 Gr
PropertyAddress: 796e) b5c {~r Phone:7 cy`'^~D,j lsl~0
Contractor License No.: 3~ / 1 ~1--~
Company: c1`/i ~(tc! F~= r.--~/) C Phone:
OWNER/CONYRACTOR SIGNATURE OF 17NDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by lltis permit application are accura[e,
and do not violate applicable ordinances, mles or regulations of[he CiTy of Wheat Ridgc or
covenants, easements or msVicfions ofrecord; that all measuremenis showq and allegations
made are accurate; that I have read and agree to abide by all wnditions printed on [his
application md tha[ I assume full responsibility for compliance with the Whcat Rid:e
Building Code (U.B.C) and all other applicable Whea[ Ridge Ordinances, for work under
this permi[.
Description:
0000 «Aaf~c
Construction Value:$ /dCG~
Permit Fee:$
Plan Review Fee:$
USC 1dX:$
Total: $
BUILDING DEPARTMENT USE ONLY
SIC: Sq Ft.:
ZONING COMMENTS: ApprovaC
Zoning:
BUILOING COMMENTS:
Approval:
PUBLIC WORKS COMMENTS:
Approval:
Occupancy: Walls: Roof: Stories: Residential Units:
Electrical License No: Plumbing License No: Mechanical License No:
Company: Company: Company:
Expiration Date: Expiration Date: Expiration Date:
Approval: Approval: Approval:
(I) 7'his permit was issued in accordance vriN Ne provisions set forth in yonr application and is snbjec[ ro Ne laws of the Stah of Colorado and ro[he Zoning
Regidations and Bnilding Codes of Wheat Ridgq Cobrado or any o1Ler applicable ardinances of tlie City.
(2) 77iis permit shal( expire if (A) tlie work authorized is not commmced wiUtin sixty (60) days Rom issue date or (B) [he builNng an[horized is suspended or
abandoned for a period of 120 days.
(3) If tliis pecmit expires, a new pertuit may be acqnired for a fre of one-half ihe amonnt nortnally mqnired, provideA m chanees hzve bem or will be mzde in
the origival plans and specifications and zny snspension or abandonmen[ has mt exceeded one (I) year. ifchanges have 6een or if suspension nr ahandnnmrnr
exceeds one (I) year, fiill fees shall be paid for a new pemit.
(4) No work of avy manner shatl be done Ihat will change Ne nanual flow of water causing a drainage problem.
(5) ContractorshallnotlfytheBuilNnginspecroriwenty-fonr(24)hoursinadvanceforallinspecrionsandshallrcceivewrittenapprovaloninspectioncaMbefore
pmceeding with mmcessive phazes of thejab.
(6) T7m issuance of a pesmit or the approval of drawings and specificatlovs shall not be constrved m be a pemit for, nor an approval of, any violation of Hie
pmvisions of the bnilding codes or auy other ordinmcq law, rule or regulation.
Chief Building Inspector
DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : 9798
BUILDING INSPECTION LINE - 303-234-5933
CITY OF WHEAT RIDGE Date : 11/17/99
7500 WEST 29TH AVENUE
1PJHEAT RIDGE, CO 80215 - (303-235-2855)
Praperty Owner :
Property Address : 7960 Melrose Drive
Phone : 303-403-1540
Contractor License No. : 20097
Company : Gas line Specialists, Inc.
Phone : 456-8622
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
Construction Value : $785.00
I hereby certiTy that the setback distances proposed by this permit application are accurate,
P0ffT11t Fee : $32.65
and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or
i
00
$0
ons
covenants, easements or restrictions of record; that all measurements shown, and allegat
.
Plan Review Fee :
made are accurate; that I have read and agreeto abide by all conditions printed on this
application, and that I assume full responsibi ty for comp iance with the Wheat Ridge Building
Use Tax : $11.7$
Code (U.B.C.) and all other applicable Whe Ridge ordances, for work under this permit.
Total $44.42
:
OWNER)(CONTRACTOR) SIG NED DATE I
(
-
Use:
Description : Addition of new Gas
BUILDING DEPARTMENT USE ONLY
SIC : Sq. Ft. :
a ~
Approval :
Zoning :
Approval :
FARR"ORRIMPOM ~ x
Approval :
Occupancy : Walls : Roof : Stories : Residential Units :
Electrical License No :
Company:
Plumbing License No :
Company:
Mechanical License No :
Company :
Expiration Date :
Approval:
Expiration Date :
Approval:
Expiration Date :
Approval :
(1) This permit was issued in accordance with the provisions set forth in yopur application and is subjed to the laws of the State of Colorado and lo [he Zoning
Regulations antl Building Cotle of Wheat Ridge, Colorado or any other applicable ordinances of the City.
(2) This permit shall expire it (A) the work authorizetl is not commenced within sixty (80) days from issue tlate or (B) the building authorized is suspended or
abantloned for a period of 120 days.
(3) If this permit expires, a new permit may be acquired for a fee of one-half ihe amount nortnally requireQ provided no changes have been or will be made in the
original plans antl specifications and any suspension or abandonment has not ezceedetl one (i) year. IF changes are matle or if suspension or abandonment
exceeds one (1) year, full fees shall be paid for a new permit.
(4) No work of any manner shall be done that will chan9e the natural Flow of water wusing a tlreinage problem.
(5) Contractor shall notiy the Builtling Inspector Rventy-tour (24) hours in advance for all insOecUOns and shall receive written approval on inspeclion carU before
proceetliing with successive phases of the job.
(6) The i ceo~f a~ p~~e yit or Ihe approval of drawings antl specifcations shall not be construed to be a permit tor, nor an approval of, any violation of the provisions
ui i any other ortlinance, law, rule or regulation.
,
Chief Buildin spector
DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number :
BUILDING INSPECTION DIVISION - 235-2855
CITY OF WHEAT RIDGE Date :
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215 AppLICATIo N
Property Owner : tD, TCNF~
Property Address : 7 °I (oU ~>~~-~o S~ CJ~ Phone :
Contractor License No. : G,4-
Company : dop `l ~ Phone : y$'&
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value : O C'7~s
I hereby certity that the setback distances proposed by this pertnit application are aaurote, PeffTllt FEE :
and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or
covenants, easements or restrictions of rerd; that all measurements shown, and ailogations
made are accurate; that 1 have read and a ee to abide by all eondkions printed on this Use Tax :
application, and that I assume full respon ility for eompl' nee with the Wheat RiAge Buikling _
Code (U.B.C.) and all other appli le eat Ridge ordi anc s, for work under this pertnk. TOt81 :
(ONMER)(CONTR4CTOR) SIGNED ~ DATE I y/9 USE :
Description LJ -Z5&~96 U'/ F 4
BUILDING DEPARTMENT USE ONLY
~nj~~ SIC : Sq. Ft. :
Approval :
Zoning :
maa ~
Approval :
Approval :
Occupancy : Walls : Roof : Stories : Residential Units :
Electrical License No
Company:
Expiration Date :
Approval :
Plumbing License No :
Company :
Expiration Date :
Approval:
Mechanical License No :
Company :
Expiration Date :
Approval :
(1)
This pertni[ was issuec
Regulations and Builtli
(2)
This pertnit shall expin
a6antlonetl for a pena
(3)
If Mis pertnit expires, a
original plans antl spei
exceetls ona (1) year,
(4)
No xrork of any manne
(5)
ConVatlor Shell notily
proceatliing with succe
(6)
Tne iuuenca W a pert
M the 6uiltling cotles o
in aemNanee wNh the provisions sel foM in yopur aOPlication antl is subjeet to the lavis of the Stale M Coloratlo anE to the Zoninp
g Cotle of Wheat Ritlge, Coloratlo or any aNer apDlicaDle oNinarrcea o1 the Ctty.
iT (A) the work authonzeA ia not commenceC wRhin aixty (80) Oays M1om iasue tlate w(B) the builaing authonzetl ia auspendeG or
ot 720 tlrys.
naw permtt msy be aoquircd tor a fee of ono-hatt the artrount normally iopuired, piovitled no ehango have been or vrill be maEe in tlro
ificaGOns anC.arry auapenaion or abanaonment has na exceeAeO one (7) year. tt chan0ea a2 maGe or tt wspension w abentlonrtient
I chanpeMe naNral 11aw of waler muaing a Oroinaqe pro0lem.
weny-four (24) hours in atlvance for all inspections antl shall receive written apDmal on inspectlon prA Defore
e. /
awinps anE speUficaOOna slwll not be conaWed to he a pertrrit for, nor an approval W, arry violatlon of the proviabna
law, (ule w reguta6on. Chief Building Inspector
DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : 6945
BUILDING INSPECTION DIVISION - 235-2855
CITY OF WHEAT RIDGE Date : 4/27/98
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215
Property Owner :
Property Address : 7960 Melrose Drive
Contractor License No. : 18038
Company : Montano Electric
Phone : 403-1314
Phone : 430 4492
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate,
and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or
covenants, easements or restrictions of record; that all measurements shown, and allegations
made are accurate; that I have read and agree to abide by all conditions printed on this
application, and that I assume full responsibility for comp ance with the Wheat Ridge Building
Code (U.B.C.) and all other applicable Wheat gidge or Inances, for rk under this permit.
(OWNER)(CONTRACTOR) SIGNED e r - ~r ;1 DATE ~-i
Description : Hook up A/C unit
ConstructionValue:
$140.00
Permit Fee :
$25.00
Plan Review Fee :
$0.00
Use Tax :
$2.10
Total:
$27.10
Use:
BUILDING DEPARTMENT USE ONLY
SIC : Sq. Ft. :
Approval:
Zoning :
Approval :
RKNOW:MW
Approval :
Occupancy : Walls : Roof : Stories : Residential Units :
Electrical License No :
Company:
Expiration Date :
Approval :
Plumbing License No :
Company :
Expiration Date :
Approval:
Mechanical License No :
Company:
Expiration Date :
Approval:
(1) This permit was issuetl in accortlance with the provisions set forth in yopur application and is subject to the laws o/ the State of Coloredo and to the Zoning
Re9ulations antl Builtling Cotle oF Wheat Ridge, Colorado or any other applicable ortlinances of the Ciry. (2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building authorizetl is suspended or
abandoned for a periotl of 120 tlays.
(3) If this permit expires, a new permit may be acquiretl for a(ee of one-half the amount normally requiretl, provitletl no changes have been or will be made in the
original plans and specifcations and any suspension or abandonment has not exceeded one (1) year. If changes are made or if suspension or abandonment
exceetls one (i) year, Full fees shall be paitl tor a new permit.
(4) No work of any manner shall be done Ihat will change the natural Flow of water causing a drainage problem.
(5) Contraclor shall notify the Building Inspector lwenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card before
proceediing with successive phases o( the job.
(6) The issuance oF a pertnit or the approval of drewings and speci5cations shall not he construed to be a pertnit for, nor an approval of, any violation of the provisions
r~ of the building codes or any other ordinance, law, rule or regulation.
I- Chief Building Inspector
THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR
CALL: 234-5933 24 HOURS PRIOR TO INSPECTION
DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number :
BUILDING INSPECTION DIVISION - 235-2855
CITY OF WHEAT RIDGE Date :
7500 WEST 29TH AVENUE 98
WHEAT RIDGE, CO 80215
Property Owner: 9,4,1 ~1 'e T
Property Address Phone : /~/u~ • /3 /
Contractor License No. :
Company : yy~ a„1c, F r.o, /Y P c Phone :`13v ,-Y5Y9 0
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value :
I hereby certity that the setback distances proposed by this pertnk appliwtion are accurete,
and do not violate appiieable ordinances, rules or regulations of the Ciry o( Wheat Ridge or
covenants, easements or restrictions of record; that all measuremenls shown, and allegations
made are accurete; that I have read and a4ree to abide by all conditions printed on this
application, and that I assume tull responsibility for comphance with the Wheat Ridge Building
Code (U.B.C.) and all other applicable Wheat fiidge ordinances, for work under this permit.
(OWNER)(CONTRACTOR)SIGNED_924i2/!i&n f.L, DATE qg USB:
Description :
Approval:
Zoning :
~fdfffgj~
Approval:
~061C~aKIR~fi~
Approval:
Occupancy : Wails
Electrical License No : .Z y6 $
Company:
Expiration Date :
Approval:
BUIIDING DEPARTMENT USE ONLY
SIC
Permit Fee :
Use Tax : / y~ Q=
Total: $0.00
Sq. FL :
Roof : Stories : Residential Units :
Plumbing License No : Mechanical License No :
Company: Company:
Expiration Oate : Expiration Date :
Approval: Approval:
(7) Tnis pertnd was Issued In aaadance wdh Me provlsians selloM In yopur appira6on anE is suejea ro tlro laws W Ca Slate ol ColoraEO and to Vrc Zminp
Regulauons an0 BuilOug Code of Wlieat Ridye, CobnEO a any oUxr applicaDle oNinancea of the Ciy.
(4) Thia pemut slwll expire d(A) the worlc auUwnzeU Is ral commence0 wiNin sizty (80) days hom issue tlate or (B) Ua Wibirq aWmized is suspended u
aEa'WOned lu a perlotl of 720 Oays.
(J) It Nis pertril expires, a new pemul may De acaulred (or a lea ol one-hatt the amounl mmmaM rc7Wmd. piovided rw tlwrpea Iww been or witl be maCe N Vro
uriginal planu and spedfiraliona and ury suspensbn a aEanOOnment tus not exceeaM one (t) year. li Uanqes are rtuEe a if suspension a abanaonmant
ezceeEs wro (t) year, Nn lees ahall be peW !or a new permit
(4) No wwk ol any manner ahall he tlpw ihat vrill tlwn0e Ihe na4ttal Ibw of waln nusing a d2inaqe problem.
(5) Conlnctot s1uU twtiN the BuiWinq InaDettot lweny-four (24) houn in aCvance fa all mspeclions arW shall receive wrillen aOP~vaI on inspectian wrd belOro
proceM urq wMh auccessWepha xs of Me~ob
(e) 7M issuance ol a permit a the approvel o! C2wUpa and spedfitaUOns shall not Oe consWeO to Ee a pemiil lor, nor an aDWmi oL airy WdaUon of the provisbns
a the buildirp wEes «airy oMer adinanea, Ww, rule w repulaUOn. Chief Building Inspector
For Mayor
THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR
CALL: 234-5933 24 HOURS PRIOR TO INSPECTION
. ' DEPARTMENT OF PLANNING AND DEVELOPMENT
BUILDING INSPECTION DIVISION - 235-2855
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215
Building Permit Number : 6818
Property Owner :
Property Address : 7960 Melrose Drive Phone : 403-1314
Contractor License No. : 19912
Company : Metro Heating & Cooling, Inc. Phone : 366-7868
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
i hereby certify that the setback distances proposed by this permit application are accurate,
and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or
covenants, easements or restnctions of record; that all measurements shown, and allegations
made are accurate; that I have read and ayree to abide by all condkions printed on this
application, and that I assume fuq responsibihty for compliance with the Wheat Ridge Building
Code (U.B.CJ and all other applieable Wheat Ktidge ordinances, for work under this permit.
(OWNER)(CONTRACTOR) SIGNED DATE
Construction Value
Permit Fee
Plan Review Fee
Use Tax
Total
Date : 4/3/98
$1, 800.00
$57.75
$0.00
$27.00
$84.75
Use:
Description : Install central air conditioning
Electrical License No :
Company :
Plumbing License No :
Company :
Mechanical License No :
Company:
Expiration Date : Expiration Date : Expiration Date :
Approval: Approval: Approval:
(i) This permil was issuetl in acwrtlance with the provisions se[ forlh in yopur application antl is sub7ect to the laws of Me State of Coloretlo antl to the Zoning
Regulations and Buildiny Code of VMeat Ridge, Colorado or any other applicable ordinances of the Cily.
(2) This pertnit shall ezpire if (A) the work authonzed is not commence0 within sixry (60) days fmm issue date or (B) the building authorizetl is suspended or
abantlonetl for a periotl of 120 days.
(3) If ihis pertntt expires, a new permR may be acquiretl for a fee of one-haM ihe amount normally requiretl, provitled no changes have been or will be made in ihe
original plans and speciflcations antl any suspension or abandonment has not exceeded one (t) year. If changes are made or if suspension or abandonmen[
exceeds one (1) year, full tces shall De paid far a new pertriit.
(4) No woAc o( any manner shall be tlone Nat will change the natural flow of water causing a drainage problem.
(5) Coniractor shall no4ry fhe 8uilding Inspector twenry-four (24) hours in aavance for all inspec[ions antl shall receive wntten approval on inspection card before
proceetliing with successive~ phasas of the ~ob.
~(@) The issuance of a permit or fhe approval d2wings and specifications shall not be consW ed to be a permft for, nor an approval of, any violation of the provislons
f of the Guilding codes pr anyother ortlinance, law, rule or requlation. ~
Chief BuTding Inspector
THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR
CALL: 234-5933 24 HOURS PRIOR TO INSPECTION
DEPARTMENT OF PLANNING AND DEVELOPMENT
BUILDING INSPECTION DIVISION - 235-2855
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215
Building Permit Number :
Date :
Property Owner : &&,s, L, FlQ-lGk,~Z
Property Address : ~%p pvtQ ( ~ ~ ~ ~ ~~~3 Phone : yp 3 / 3 /Y
Contractor License No. LlGt l,~L
Company : M ET2~? lJ~-~.u~ a,<_p 14faG Phone : 3(0(0 ` 7S69-
OWNER/CONTRACTOR SIGNATURE OF
AND AGREEMENT
Construction Value :
I hereby ceAify that the setback distances proposed by this pertnit application are accurete,
and do not violate applieable ordinances, rules or regulations of the Ciry of Wheat Ridge or
covenants, easements or restridions of record; lhat all measurements shown, and allegations
made are accurate; that I have read and a9ree to abide by all eonditions printed on this
appliwtion, and that I assume full responsibil'Ry tor compliance with the Wheat Ridge Building
Code (U.B.C.) and all other applicable W~eat Ridge ordinang", for work under this permit.
(OWNER)(CONTRACTOR)
Permit Fee : S-1 _ 7 S
Use Tax :
Total: $0.00
Use:
BUILDING DEPARTMENT USE ONLY
SIC : Sq. FL :
Approval:
Zoning :
Approval :
I APProval:
Occupancy : Walls : Roof : Stories : Residential Units :
Electrical License No : Plumbing License No : Mechanical License No :
Company: Company: Company:
Expiration Date : Expiration Date : Expiration Date :
Approval: Approval: Approval:
(t ) This pertnil was issuetl i^ aaadance wilh the pmWSions set IaN In yopur application and is subieU ro Me laws of the State ol CabraEO and W Me Zoninq
RegulaGons anE Bultliny Code of Wheat Ridge, Cobrado a any oNer applinde ortlinances o( the Ciry.
(Y) This pertriil sfuH expire A(A) the vrork auNOnzed la nol corntrenced wMln sixry (60) Cays hom issue Cate or (8) the Wildlnp aWwrize0 is suspended u
aEanOoned lu a peAaE ot 120 days.
(J) If Nis pemtil expires, anew pertrvt may be aWuired fa a fee ol ono-Aatl Ne amount nomuly reyuired, proMed no Wnges hava baen a will be made in the
original pWns and apeaf"tians enE wry wspension or aOaiWOnment has'wt exceetled one (t) year. it duipes ara maae w H wspenabn «aOanCOnmant
ezceetls ona (1) year, Nu /ees shall be paW la a new peimiL
(4) No work a( airy manner shaU be dane Ihal will change the natural flow ol water causing a d2inaqe problem.
(5) Conuacta shali noUry the Buiainq Inspedor twenry-tour (24) hours in aEvaMe lor all mspenions anC stwil receNa writlen approval on Inspation raN ENOre
pnceeCiinp wnn suaessWeWw xs of tlieIob
(e) The issuance ol a pertrvl a the appoval olCrowinqs aM spetlfra6ons shall rot De consUUeE m be a pemul fa, nor an approval of, any vblatlon ol Me proWSbna
. U the OuiWinp [odes a anY oUwf ordin0nce. law.'ule a repuW4on. Chief Building Inspector
Description :~,~~.i,q//
O
For Mayor
THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR
CALL: 234-5933 24 HOURS PRIOR TO INSPECTION