HomeMy WebLinkAbout7960 Melrose DriveINSPECTION RECORD Occupancy/Typ INSPECTION ONLINE FORM: hftp://www.ci.wheatridge.co.us/inspection r INSPECTION REQUEST LINE: (303) 234-5933 Inspections will not be performed unless this card is posted on the project site. "Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day." Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Comments Initials Pier Wall Sheathing Concrete Encased Ground (CEG) Foundation / P.E. Letter Mid -Roof Do Not Pour Concrete 'Prior To Approval Of The Above Inspections Underground/Slab Inspections Date Inspector Comments Initials Electrical Sewer Service Plumbing Do Not Cover Underground or Below/ln-Slab Work Prior To Approval Of The Above Inspections Rough Inspections Date Inspector Initials Comments Wall Sheathing Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. Mid -Roof Floodplain Inspection (if applicable) Lath / Wall Tie Fire Inspection / Fire Protection Dist. Rough Electric Final Electrical Rough Plumbing/Gas Line Final Plumbing Rough Mechanical Final Mechanical Rough Framing Roof Rough Grading Final Window/Doors Insulation Final Building Drywall Screw / Nail NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing AtA, ii -j 0\ Final Mechanical Kq Cgi_n kvloi4— Roof Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. *For low voltage permits — Please be sure that rough inspections are completed from the Fire District and electrical low voltage by the Building Division. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather UA la"4,0,wu The City of Wheat Ridge Third Party Form Check List Property Address 7960 Melrose Drive Permit Number 201704539 Permit Issued Date 07/20/2017 Owner Information Property Owner Information Suzanne Fitzpatrick Property Owner Address Same as above Inspector Information Inspection Company Certified Building Consultants Inspector Name Kraig Stanforth Inspector Contact info. 720-940-1180 KStanforthCBC0.gmail.com Inspector Statement of Acknowledgement "1 hereby acknowledge the roof I am inspecting is 6/12 or over. All roofs that are under 6/12 must be inspected by the City of Wheat Ridge Building Department. *1 hereby acknowledge the roofing system for the referenced building has been inspected and found to be in compliance with the minimum requirements of the 2012 IRC and 2012 IBC as well as the City of Wheat Ridge Policies and Procedures and manufacturer's recommendations and sp cifications. I Inspector: t Date: Pro a Owner Statement of Acknowledgement *1 hereby acknowledge that I am the owner of the building referenced above and I give my consent for the listed third -party inspection company to perform my roof inspection in lieu of the City of Wheat Ridge BL#Ijing Di ision inspection. 1 Property Owner/Agent: Date:' 11 V1 This original document, as well as Me roofing checklist, must be submitted to the Chief Building Official within seven days of the final inspection. Drop off in person Submit via Email Permit Counter 2nd Floor Kcook _ci.wheatridge.co.us 7500 W. 291 Ave Wheat Ridge, CO 80033 CBC Wheat Ridge Roof Inspection Packet Page 1 of N/A ❑ Pass ❑ Fail Metal roof shingles shall not be installed on slope less than 3:12 N/A ❑ Pass ❑ Fail Metal valley flashing shall be the same material as roof N/A ❑ Pass ❑ Fail Metal valley flashing shall extend a min. of 8" from the centerline with a min. of 3/4 " high splash diverter rib built-in at the flow line with the sections overlapping a min. of 4" Tile Roof Requirements rz N/A ❑ Pass ❑ Fail Clay and concrete tile shall have a min. 2-1/2:12 slope N/A ❑ Pass ❑ Fail Slopes 4:12 and under require double underlayment CBC Wheat Ridge Roof Inspection Packet Page 2 of 5 The City of Wheat Ridge Inspection Check List Notes Mid -Roof Roof Inspection ❑ N/A ' Pass ❑ Fail Structural roof components ❑ N/A Pass ❑ Fail Verify that no more than 2 layers of shingles exist ❑ N/A Pass ❑ Fail Flashing for roof and walls ❑ N/A ❑ Pass ❑ Fail If new sheathing is installed, verify that it is listed in the permit description (Valuation must be adjusted) N/A ❑ Pass ❑ Fail Verify sheathing nail pattern (see Policy and Procedures) N/A ❑ Pass ❑ Fail Crickets and saddles where needed ❑ N/A X—"f Pass ❑ Fail Verify vent must have boot same gauge as pipe ❑ N/A Pass ❑ Fail Verify vent caps ❑ N/A Pass ❑ Fail Verify no flashings are damaged or rusted N/A ❑ Pass ❑ Fail Step flashing shall be min. of 44 piece per shingle N/A ❑ Pass ❑ Fail Verify scuppers allow for proper drainage ❑ N/APass ❑ Fail Ice and water shield 2' in heated wall spaces ❑ N/A Pass ❑ Fail Underlayments must follow 2012 IRC/2012 IBC ❑ N/A Pass ❑ Fail Verify roof slope for proper damage ❑ N/A Pass ❑ Fail Dripedge shall have min. of 2" overlap ❑ N/A Pass ❑ Fail Dripedge should extend down min. 2" past roof deck ❑ N/A tie Pass ❑ Fail Dripedge shall be mechanically fastened 12" OC ❑ N/A /�A Pass ❑ Fail 9 oofing shall not be applied to roof slopes less than 2.12 slo_p.P.Axception, detached garages, patios, carports, open ree sides with min. slope of 1:12 N/A ❑ Pass ❑ Fail Above roof insulation R-25 N/A ❑ Pass ❑ Fail Below roof residential R-38 N/A ❑ Pass ❑ Fail Below roof commercial R-32 ❑ N/A 14ass ❑ Fail Modified Bitumen, EPDM, TPO min. slope 1/4:12 slope must be installed in accordance with the manufacturer's specifications. Must have manufacturer's letter of warranty with the address on the letter for final inspection Metal Roof Shingles Requirements N/A ❑ Pass ❑ Fail Metal roof shingles shall not be installed on slope less than 3:12 N/A ❑ Pass ❑ Fail Metal valley flashing shall be the same material as roof N/A ❑ Pass ❑ Fail Metal valley flashing shall extend a min. of 8" from the centerline with a min. of 3/4 " high splash diverter rib built-in at the flow line with the sections overlapping a min. of 4" Tile Roof Requirements rz N/A ❑ Pass ❑ Fail Clay and concrete tile shall have a min. 2-1/2:12 slope N/A ❑ Pass ❑ Fail Slopes 4:12 and under require double underlayment CBC Wheat Ridge Roof Inspection Packet Page 2 of 5 The City of Wheat Ridge Inspection Check List Notes Mid -Roof Notes Company Name: Certified Building Inspector Signature: /1 Date of Inspection: CBC Wheat Ridge Roof Inspection Packet Page 3 of 5 The City of Wheat Ridge Inspection Check List (dotes Final Roof Roof Inspection ❑ N/A Pass ❑ Fail Structural roof components ❑ N/A /�° Pass ❑ Fail Verify that no more than 2 layers of shingles exist ❑ N/A !� Pass ❑ Fail Flashing for roof and walls ❑ N/A Pass ❑ Fail Structural roof components ❑ N/A Vol" Pass ❑ Fail If new sheathing is installed verify that it is listed in the permit description (Valuation must be adjusted) N/A ❑ Pass ❑ Fail Verify sheathing nail pattern (See Policy and Procedures) f/�L_' N/A ❑ Pass ❑ Fail Crickets and saddles where needed ❑ N/A hd Pass ❑ Fail Verify B vent must have boot same gauge as pipe ❑ N/A i- Pass ❑ Fail Verify vent caps ❑ N/A / Pass ❑ Fail Verify no flashings are damaged or rusted N/A ❑ —Pass ❑ Fail Step flashing shall be min. of 4x4 piece per shingle �IV/A ❑ Pass ❑ Fail Verify scuppers allow for proper drainage ❑ N/A ass ❑ Fail Ice and water shield 2' in heated wall spaces ❑ N/A ass ❑ Fail Underlayments must follow 2012 IRC/2012 IBC ❑ N/A Pass ❑ Fail Verify roof slope for proper drainage ❑ N/A hd Pass ❑ Fail Dripedge shall have min. 2" of overlap ❑ N/A Pass ❑ Fail Dripedge should extend down min. 2" past roof deck ❑ N/A Pass ❑ Fail Dripedge shall be mechanically fastened 12" OC ❑ N/A , Pass ❑ Fail 90 LB roll roofing shall not be applied to roof slopes less than 2:12 slope: Exception, detached garages, patios, carports, open on three sides with min. slope of 1:12 ❑ N/APass ❑ Fail Modified Bitumen, EPDM, TPO min. slope 1/4:12 slope must be installed in accordance with the manufacturer's letter of warranty with the address on the letter for final inspection Metal Roof Shingles Requirements N/A ❑ Pass ❑ Fail Metal roof shingles shall not be installed on slope less than 3:12 N/A ❑ Pass ❑ Fail Metal valley flashing shall be the same material as roof N/A ❑ Pass ❑ Fail Metal valley flashing shall extend a min. of 8" from the centerline with a min. of 3/4 " high splash diverter rib built-in at the flow line with the sections overlapping a min. of 4" Tile Roof Requirements /A ❑ Pass ❑ Fail Clay and concrete tile shall have a min. 2-1/2:12 slope N/A ❑ Pass ❑ Fail Slopes 4:12 and under require double underlayment CBC Wheat Ridge Roof Inspection Packet Page 4 of 5 The City of Wheat Ridge Inspection Check List Notes Final Roof Notes Company Name: Certified Building Consultants Inspector Signature: Date of Inspection:'" CBC Wheat Wheat Ridge Roof Inspection Packet Page 5 of 5 City of Wheat Ridge Residential Roofing PERMIT - 201704539 PERMIT NO: 201704539 ISSUED: 07/20/2017 JOB ADDRESS: 7960 Melrose DR EXPIRES: 07/20/2018 JOB DESCRIPTION: Residential Re -roof to install MULE HIDE MODIEFIED BITUMEN ROLLED asphalt shingles with 24SQ HOUSE 1.5/12PITCH 1STORY *** CONTACTS *** OWNER (303)467-0387 FITZPATRICK C SUZANNE SUB (720)536-8870 Chris Falasco 160159 Endeavor Exteriors *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2406 / BEL AIRE,HILLCREST HEIGHTS, ME BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 11,452.24 FEES 1 Total Valuation 0.00 Use Tax 240.50 _ Permit Fee 236.00 ** TOTAL ** 476.50 —� *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. City of Wheat Ridge Residential Roofing PERMIT - 201704539 PERMIT NO: 201704539 ISSUED: 07/20/2017 JOB ADDRESS: 7960 Melrose DR EXPIRES: 07/20/2018 JOB DESCRIPTION: Residential Re -roof to install MULE HIDE MODIEFIED BITUMEN ROLLED asphalt shingles with 24SQ HOUSE 1.5/12PITCH 1STORY I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applica le building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorzed by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. 1 further attest that I am leg�ally authorized tonclude all entities named within this document as parties to the work to be performed and that all work to, be perform] is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNERor CONTRACTOR (Circle one) Date c 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing; and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4, No work of an manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuTer ranting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicabany ordi a�r regulation of this jurisdiction. Approval of work is subject to field inspection. �r1l�t� at.A . J Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Dan Schultz e;? 01 -7 d From: no-reply@ci.wheatridge.co.us Sent: Wednesday, July 12, 2017 9:40 AM To: Permits CommDev Subject: Online Form Submittal: Residential Roofing Permit Application Categories: Gina Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email Address 7960 Melrose Drive Suzanne Fitzpatrick 303-467-0387 Field not completed. q�4 ) Do you have a signed Yes contract to reroof this property? It will need to be provided at the time of permit pick-up. CONTRACTOR INFORMATION Contractor Name Contractor's License Number (for the City of Wheat Ridge) Contractor Phone Number Endeavor Exteriors 160159 720-536-8870 Contractor Email Address production@endeavorexteriors.com Retype Contractor Email production@endeavorexteriors.com Address DESCRIPTION OF WORK Are you re -decking the No roof? Description of Roofing Material Select Type of Material If "Other" is selected above, describe here: Mule Hide - Modified Bitumen Rolled Modified Bitumen How many squares of the 24 material selected above? Does any portion of the Yes property include a flat roof? If yes, how many squares 24 on the flat roof? TOTAL SQUARES of all 24 roofing material for this project Provide additional detail House. 1.5/12 pitch. 1 -story here on the description of z work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract 11,452.24 value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant Alex Knoll Email not displaying correctly? View it in your browser. 3 CLIENT AGREEMENT EDEWEXTERIORS T' 7808 Cherry Creek South Dr. Suite 401, Denver, CO 80231 BBB.I Office: (720) 536-8870 1 www.TheEndeavorTeam.com I Licensed & Insured Client Email Date Street Address Endeavor Re City, State, Zip L, kea i Insurance Company I Insurance Agent Home Phone Work Phone Claim # 3Gs'-kr7-C, Mortgage Company (only if mortgage company is present on payment) Lender Loan # ❑ Borrow Authorization Form Signed ❑ Photo of Mortgage Check Taken Limited Lifetime Labor Warranty 0 Gen. LiabilitylWorkers' Comp r BBB Accredited 0 No Deposit Required ROOF SCOPE: CFullPartial Repair WINDOWS: Full Pa rtial�...�2epair PAINT: Full Partial Repair Brand: Brand: Brand Brand Color: Mod or Color(s)---' Metal Color. Felt: � tet, h 15 Sr ni,eFtc GUTTERS: Full Partial UColo -- ❑G Downsp outs SIDING: Full Partial I Brand Style: Payment Terms Client understands and agrees their insurance company will not pay the deductible amount or any upgrade client is opting to pay for. Client's expense for these items are: First payment will be collected when work begins or material delivered - whichever occurs first. This is partial compensation for labor and materials. This amount is: Work to be completed according to the specifications in the total amount of: OTHER: $ )U/ilk, $ 7Z�0 .1 $ 5 L Z,? ❑ Balance due upon substantial completion,) CASH SALE []Contingency Agreement (Contingent upon Ins. approval) ❑ INSURANCE AGREEMENT. The client authorizes Endeavor Exteriors to represent their best interest in pursuit of full replacement costs for damages believed to be covered under homeowner's insurance and allows Endeavor Exteriors to deal directly with the insurance company regarding this claim. This contract does not obligate the client to Endeavor Exteriors until the claim is approved by the insurance company, and accepted by Endeavor Exteriors. Upon approval of claim. Endeavor Exteriors will complete all specified work at a price agreeable to the insurance company (RCV) and Endeavor Exteriors with no additional cost to the client, except for the deductible Ordinance and Law (supplemental) items may increase the original (RCV) amount Final agreed upon once will become the final contract once. and request that all payments be made payable to Endeavor Exteriors Inc- Endeavor Exteriors will not collect payment until the work has begun or materials have been delivered. 'Credit card payments are not accepted on insurance claims' I (we) agree, by signing below, to all the co tr t conditions on both front and back, oft is agreement Client Signature: Date of Acceptance: Client Signature: Endeavor Signature: The terms on the back of this contract have bee nrev}ewe4-"h me and I (we) agree to them Client Initials: I`- 1. If the client plans to use the proceeds of property and casualty insurance policy pursuant to part I of article 4 of title 10, C.A.S., to pay for the roofing work, pursuant to section 6-2-105, the roofing contractor cannot pay, waive, rebate, or promise to pay, waive, or rebate all or part of any insurance deductible applicable to the insurance claim for payment for work on the covered residential property. 2. All Contracts subject to approval by Endeavor Exteriors financial department. Contract price is valid for thirty (30) days. -I. 1:ndeavor Extcriors reserves the right to perform specified work in accordance with generally accepted construction guidelines, while adhering to local codes in effect at the time of contract. 5. All checks must be made payable to: Endeavor Exteriors. 0. All excess materials remain the property of Endeavor Exteriors. Client is responsible for Homeowner's Association approval of products and colors. 8. Client acknowledges Endeavor Exteriors as a general contractor, as such Endeavor Exteriors will be entitled to ten percent (10%) overhead, and ten percent (10%) profit, (O&P) if approved by the insurance company, ll this project is part of a claim. 9. An account is defined as past due when 10 days have elapsed from the date of completion of work. Past due accounts will earn interest at a rate of one and one-half percent (1.5%) per month or eighteen percent (18%) annually. If Endeavor Exteriors is required to turn the matter over to an attorney for collection, the client also agrees to pay all costs incurred, including attorney's fees. I t). Should default of payment occur on this contract, Endeavor Exteriors reserves the right to place a mechanic's lien on the clients' property. IL Endeavor Exteriors shall not be held liable for failure of performance due to labor controversies, strike, fire, hail, weather, inability to obtain material from usual source, or any other circumstance beyond the control of the company. 12. Our standard workmanship warranty for roofing is non -transferable limited lifetime, and one (1) year for all other trades, and the company will provide a service call for roof inspection, as long as the client owns the property. I Endeavor Exteriors is not responsible for any leaks or water damage below the roolline caused by excessive wind, ice oi- hail during the period of the warranty. 1-1. Endeavor Exteriors shall refund any deposit if this contract is cancelled within 72 hours (3 days). 15. If this contract is cancelled by the client, after three (3) or more days of execution, the client agrees to pay Endeavor Exteriors twenty percent (20%) of the contract price, set by the insurance company, only if materials have been delivered or work has been performed, as liquidated damages. This payment is not a penalty, but is fair and just compensation for services rendered to that point. I6. The homeowner may cancel this contract within 72 hours if the insurer has denied, in whole or part, the homeowners claim that relates to this contract. 17. While we make every effort to ensure there are limited consequences of construction, Endeavor Exteriors will not be held responsible for slight scratching or denting of gutters, droplets of oil in the driveway, cracks in concrete, or damage to plants and trees. Furthermore, Endeavor Exteriors will not be held responsible for exterior damages such as deteriorated trim pieces, crown molding, stucco, solar panels, evaporative coolers, existing skylights, or interior damage such as falling dust and debris, cracked plaster, sheet rock or nail pops, as a result of normal re -roofing. 1 S. Replacement or repair of the deteriorated decking, fascia boards, swamp coolers, ventilators, chimneys, counter flashing, or any other work completed for the homeowner not explicitly stated in this contract, are not included in quoted price and will be charged as extra on a time and material basis. 19. lindeavor Exteriors holds the right to photograph all projects in which it is invloved, and the right to publish throughout all Endeavor Exteriors' social media outlets. INSPECTION RECORD OccupancV/TVpe INSPECTION LINE: (303) 234 -5933 Inspections will not be made unless this card is posted on the building site Wi�oa 4 Call by 3:00 PM to receive inspection the following business day. O kT'V Ai 1 141 INSPECTOR MUST SIGN LL SPACES PERTAINING TO THIS JOB FOUNDATION INSPECTIONS DATE INSPECTOR INITIALS COMMENTS: Footings /Caissons Stemwall / (CEG) Concrete Encased Ground b - Electrical Service Reinforcing or Monolithic — 6 Rough Electric Weatherproof / French Drain Rough Plumbing Sewer Service Lines Gas Piping Water Service Lines - Rough Mechanical INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS. POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED CONCRETE SLAB FLOOR Electrical (Underground) "NOTE: ALL ITEMS MUST BE COMPLETED AND APPROVED BY PLANNING AND ZONING, BUILDING AND PUBLIC WORKS BEFORE A CERTIFICATE OF OCCUPANCY IS ISSUED. FINAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTEAUTHORIZATION OF A CERTIFICATE OF OCCUPANCY NOR PERMISSION FOR OCCUPANCY. Plumbing (Underground) Heating (Underground) �Iil�`[�ri� •ld \IN �iTi17�1: fil�_RiPly: R9:13tl. �.`IrN.ly� ROUGHS Sheathing Lath I Wall tie Mid -Roof b - Electrical Service Roof — 6 Rough Electric Building Final Rough Plumbing Fire Department Gas Piping R.O.W & Drainage - Rough Mechanical INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS. Parking & Landscaping ABUVE INSPECTION5 TO BE SIGNED PRIOR TO PROCEEDING Framing Insulation Drywall Screw EE FINALS Electrical Plumbing Mechanical - Roof — 6 Building Final Fire Department R.O.W & Drainage INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS. Parking & Landscaping "NOTE: ALL ITEMS MUST BE COMPLETED AND APPROVED BY PLANNING AND ZONING, BUILDING AND PUBLIC WORKS BEFORE A CERTIFICATE OF OCCUPANCY IS ISSUED. FINAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTEAUTHORIZATION OF A CERTIFICATE OF OCCUPANCY NOR PERMISSION FOR OCCUPANCY. OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF OCCUPANCY IS ISSUED PROTECT THIS CARD FROM THE WEATHER e , A CITY OF WHEAT RIDGE - Bung Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: f-I i\ Job Address: c r-6 Permit Number: Da El No one available for inspection: Time i 1 R QM Re-Inspection required: Yes_ No *When corrections have been made, call for re-inspection at 303-234-5933 Date:` Inspector: DO NOT REMOVE THIS N TICE r , I ♦ i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303).235-2855 Office • (303) 237-8929 Fax INSPECTION VOTICE Inspection Type: ✓ Job Address: Permit Number: f (`kLl z ❑ No one available for inspection: Time AM & Re-Inspection required: Yes When corrections have been made, call for re-inspection at 303-234-5933 Date: Inspector: y ~Oma DO NOT REMOVE THIS ~11OTICE E i of ""~rq City of Wheat Ridge Building Division ~m 7500 W. 29th Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-235-2857 °OLOano° Inspection Line: 303-234-5933 Property Owner (please Mailing Address: (if different than property address) Address: S (~Q `-,,J Contractor License Electrical City License # Company: Exp. Date: Phone: Date: Plan ?ermit It. Plumbing City License Company Exp. Date: Use of s ace descri tion): ~~l 1-v✓~ jhly~ iT/~ tAe~` YYkl> - r,- Mechanical City License Company: Exp. Date: e? Construction value: $ 0 (as calculated per the Building Valuation Data sheet) Plan Review (due at time of submittal): $ Sq. Ft./L.Ft added: Squares BTU's Gallons Amps OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT f hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements-shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that l assume full responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for work under this permit. Plans subject to field inspection. - CIRLCEONE. (O NER TRACTOR) or PERSONALREPRTATIV o oWNE (CONTRATOR) PRINT NAM ~~.F;.'~ {"IC)t - SIGNATURE: 7 Date: to Building Permit Application DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : 13932 BUILDING INSPECTIONLINE - 303-234-5933 Date : 5/30/02 CITY OF WHEAT RIDGE 7500 WEST 29tH AVENUE WHEAT RIDGE, CO 80215 - (303-235-2855) Property Owner. GENE FLETCHER Property Address : 7960 MELROSE DR Phone : 403-1540 Contractor License No. : 21301 Company : Northern Electric, Inc. Phone : 428-6969 OWNER/CONTRACTOR SIGNATURE OF U'NDERSTANDING AND AGREEMENT Construction Value : $1,600.00 I hereby certiTy that the setback distances proposed by this permit application are accurete, and Pefmit Fee : $57.05 do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or Plan Review Fee : $0.00 covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all wnditions printed on this Use Tax : $19.20 application, and that I assume full responsibility for compliance ith the Wheat Ridge Building u Code (U.B.C.) and all other applicable Wheat Ri~rdiryfn~for work under this permit. TOt81 : $76.25 (OWNER)(CONTR4CTOR) SIGNED (V~~~DATE O~ U se Description : 200 AMP SERVICE C ~ BUILDING DEPARTMENT USE ONLY ~ WWWWO.e.,, SIC : Sq. Ft. : Approval: Zoning : Approval : PAO~ ~~~OW, Approval: Occupancy : Walls : Roof : Stories : Residential Units : Electrical License No : 21301 Plumbing License No : Mechanical License No : Company : Northern Electric, Inc. Company : Company : Expiration Date : 2/28/03 Approval : OKIKS Expiration Date : Expiration Date : Approval: Approval: (1) This permit was issued in accortlance with the provisions set forth in yopur application and is subject to lhe laws ot the State of Coloratlo and to the Zoninq Regulations antl Building Code of Wheat Ridge, Colorado or any other applicable ortlinances of the Ciry. (2) This permit shall expire if (A) the work authorizetl is not commenced wi[hin sinty (60) days from issue date or (B) the building authorized is suspended or abandoned for a period of 720 days. (3) If this permit expires, a new permit may be acquired for a fee of one-half ihe amount normally requireQ provided no changes have been or will be made in lhe original plans and specifcations and any suspension or abandonment has not exceetled one (1) yeac If changes are made or if suspension or abandonment exceeds one (1) year, full tees shall be paid for a new permit. (4) No work of any manner shall be done that will Change the natural Flow otwater causing a dreinage problem. (5) Contrector shall notify the Building Inspector lwenty-four (24) hours in advance for all inspections and shall receive written approval on inspedion card before Xy'_Is ung with successive phases of the job.(8) s ancof1, rmit or the approval of drawings antl specifications shall not be construed ro be a permit for, nor an approval of, any violation of the s n/'G~4 ` ing g codes or any other oYdinance, law, rule or re9ulation. Chief Buildi Inspector DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Nwnber: OF WHEAT ~ BUILDING INSPECTION LINE - 303-234-5933 Date: CITY OF WHEAT RIDGE 7500 WEST 29TH AVENiJE WHEAT RIDGE, CO 80215 - (303-235-2855) ~aC OR Aa~ AMU" TTON PropertyOwner: Crcn e 'T-AG2 Gr PropertyAddress: 796e) b5c {~r Phone:7 cy`'^~D,j lsl~0 Contractor License No.: 3~ / 1 ~1--~ Company: c1`/i ~(tc! F~= r.--~/) C Phone: OWNER/CONYRACTOR SIGNATURE OF 17NDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by lltis permit application are accura[e, and do not violate applicable ordinances, mles or regulations of[he CiTy of Wheat Ridgc or covenants, easements or msVicfions ofrecord; that all measuremenis showq and allegations made are accurate; that I have read and agree to abide by all wnditions printed on [his application md tha[ I assume full responsibility for compliance with the Whcat Rid:e Building Code (U.B.C) and all other applicable Whea[ Ridge Ordinances, for work under this permi[. Description: 0000 «Aaf~c Construction Value:$ /dCG~ Permit Fee:$ Plan Review Fee:$ USC 1dX:$ Total: $ BUILDING DEPARTMENT USE ONLY SIC: Sq Ft.: ZONING COMMENTS: ApprovaC Zoning: BUILOING COMMENTS: Approval: PUBLIC WORKS COMMENTS: Approval: Occupancy: Walls: Roof: Stories: Residential Units: Electrical License No: Plumbing License No: Mechanical License No: Company: Company: Company: Expiration Date: Expiration Date: Expiration Date: Approval: Approval: Approval: (I) 7'his permit was issued in accordance vriN Ne provisions set forth in yonr application and is snbjec[ ro Ne laws of the Stah of Colorado and ro[he Zoning Regidations and Bnilding Codes of Wheat Ridgq Cobrado or any o1Ler applicable ardinances of tlie City. (2) 77iis permit shal( expire if (A) tlie work authorized is not commmced wiUtin sixty (60) days Rom issue date or (B) [he builNng an[horized is suspended or abandoned for a period of 120 days. (3) If tliis pecmit expires, a new pertuit may be acqnired for a fre of one-half ihe amonnt nortnally mqnired, provideA m chanees hzve bem or will be mzde in the origival plans and specifications and zny snspension or abandonmen[ has mt exceeded one (I) year. ifchanges have 6een or if suspension nr ahandnnmrnr exceeds one (I) year, fiill fees shall be paid for a new pemit. (4) No work of avy manner shatl be done Ihat will change Ne nanual flow of water causing a drainage problem. (5) ContractorshallnotlfytheBuilNnginspecroriwenty-fonr(24)hoursinadvanceforallinspecrionsandshallrcceivewrittenapprovaloninspectioncaMbefore pmceeding with mmcessive phazes of thejab. (6) T7m issuance of a pesmit or the approval of drawings and specificatlovs shall not be constrved m be a pemit for, nor an approval of, any violation of Hie pmvisions of the bnilding codes or auy other ordinmcq law, rule or regulation. Chief Building Inspector DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : 9798 BUILDING INSPECTION LINE - 303-234-5933 CITY OF WHEAT RIDGE Date : 11/17/99 7500 WEST 29TH AVENUE 1PJHEAT RIDGE, CO 80215 - (303-235-2855) Praperty Owner : Property Address : 7960 Melrose Drive Phone : 303-403-1540 Contractor License No. : 20097 Company : Gas line Specialists, Inc. Phone : 456-8622 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value : $785.00 I hereby certiTy that the setback distances proposed by this permit application are accurate, P0ffT11t Fee : $32.65 and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or i 00 $0 ons covenants, easements or restrictions of record; that all measurements shown, and allegat . Plan Review Fee : made are accurate; that I have read and agreeto abide by all conditions printed on this application, and that I assume full responsibi ty for comp iance with the Wheat Ridge Building Use Tax : $11.7$ Code (U.B.C.) and all other applicable Whe Ridge ordances, for work under this permit. Total $44.42 : OWNER)(CONTRACTOR) SIG NED DATE I ( - Use: Description : Addition of new Gas BUILDING DEPARTMENT USE ONLY SIC : Sq. Ft. : a ~ Approval : Zoning : Approval : FARR"ORRIMPOM ~ x Approval : Occupancy : Walls : Roof : Stories : Residential Units : Electrical License No : Company: Plumbing License No : Company: Mechanical License No : Company : Expiration Date : Approval: Expiration Date : Approval: Expiration Date : Approval : (1) This permit was issued in accordance with the provisions set forth in yopur application and is subjed to the laws of the State of Colorado and lo [he Zoning Regulations antl Building Cotle of Wheat Ridge, Colorado or any other applicable ordinances of the City. (2) This permit shall expire it (A) the work authorizetl is not commenced within sixty (80) days from issue tlate or (B) the building authorized is suspended or abantloned for a period of 120 days. (3) If this permit expires, a new permit may be acquired for a fee of one-half ihe amount nortnally requireQ provided no changes have been or will be made in the original plans antl specifications and any suspension or abandonment has not ezceedetl one (i) year. IF changes are matle or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit. (4) No work of any manner shall be done that will chan9e the natural Flow of water wusing a tlreinage problem. (5) Contractor shall notiy the Builtling Inspector Rventy-tour (24) hours in advance for all insOecUOns and shall receive written approval on inspeclion carU before proceetliing with successive phases of the job. (6) The i ceo~f a~ p~~e yit or Ihe approval of drawings antl specifcations shall not be construed to be a permit tor, nor an approval of, any violation of the provisions ui i any other ortlinance, law, rule or regulation. , Chief Buildin spector DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE Date : 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 AppLICATIo N Property Owner : tD, TCNF~ Property Address : 7 °I (oU ~>~~-~o S~ CJ~ Phone : Contractor License No. : G,4- Company : dop `l ~ Phone : y$'& OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value : O C'7~s I hereby certity that the setback distances proposed by this pertnit application are aaurote, PeffTllt FEE : and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of rerd; that all measurements shown, and ailogations made are accurate; that 1 have read and a ee to abide by all eondkions printed on this Use Tax : application, and that I assume full respon ility for eompl' nee with the Wheat RiAge Buikling _ Code (U.B.C.) and all other appli le eat Ridge ordi anc s, for work under this pertnk. TOt81 : (ONMER)(CONTR4CTOR) SIGNED ~ DATE I y/9 USE : Description LJ -Z5&~96 U'/ F 4 BUILDING DEPARTMENT USE ONLY ~nj~~ SIC : Sq. Ft. : Approval : Zoning : maa ~ Approval : Approval : Occupancy : Walls : Roof : Stories : Residential Units : Electrical License No Company: Expiration Date : Approval : Plumbing License No : Company : Expiration Date : Approval: Mechanical License No : Company : Expiration Date : Approval : (1) This pertni[ was issuec Regulations and Builtli (2) This pertnit shall expin a6antlonetl for a pena (3) If Mis pertnit expires, a original plans antl spei exceetls ona (1) year, (4) No xrork of any manne (5) ConVatlor Shell notily proceatliing with succe (6) Tne iuuenca W a pert M the 6uiltling cotles o in aemNanee wNh the provisions sel foM in yopur aOPlication antl is subjeet to the lavis of the Stale M Coloratlo anE to the Zoninp g Cotle of Wheat Ritlge, Coloratlo or any aNer apDlicaDle oNinarrcea o1 the Ctty. iT (A) the work authonzeA ia not commenceC wRhin aixty (80) Oays M1om iasue tlate w(B) the builaing authonzetl ia auspendeG or ot 720 tlrys. naw permtt msy be aoquircd tor a fee of ono-hatt the artrount normally iopuired, piovitled no ehango have been or vrill be maEe in tlro ificaGOns anC.arry auapenaion or abanaonment has na exceeAeO one (7) year. tt chan0ea a2 maGe or tt wspension w abentlonrtient I chanpeMe naNral 11aw of waler muaing a Oroinaqe pro0lem. weny-four (24) hours in atlvance for all inspections antl shall receive written apDmal on inspectlon prA Defore e. / awinps anE speUficaOOna slwll not be conaWed to he a pertrrit for, nor an approval W, arry violatlon of the proviabna law, (ule w reguta6on. Chief Building Inspector DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : 6945 BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE Date : 4/27/98 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Property Owner : Property Address : 7960 Melrose Drive Contractor License No. : 18038 Company : Montano Electric Phone : 403-1314 Phone : 430 4492 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application, and that I assume full responsibility for comp ance with the Wheat Ridge Building Code (U.B.C.) and all other applicable Wheat gidge or Inances, for rk under this permit. (OWNER)(CONTRACTOR) SIGNED e r - ~r ;1 DATE ~-i Description : Hook up A/C unit ConstructionValue: $140.00 Permit Fee : $25.00 Plan Review Fee : $0.00 Use Tax : $2.10 Total: $27.10 Use: BUILDING DEPARTMENT USE ONLY SIC : Sq. Ft. : Approval: Zoning : Approval : RKNOW:MW Approval : Occupancy : Walls : Roof : Stories : Residential Units : Electrical License No : Company: Expiration Date : Approval : Plumbing License No : Company : Expiration Date : Approval: Mechanical License No : Company: Expiration Date : Approval: (1) This permit was issuetl in accortlance with the provisions set forth in yopur application and is subject to the laws o/ the State of Coloredo and to the Zoning Re9ulations antl Builtling Cotle oF Wheat Ridge, Colorado or any other applicable ortlinances of the Ciry. (2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building authorizetl is suspended or abandoned for a periotl of 120 tlays. (3) If this permit expires, a new permit may be acquiretl for a(ee of one-half the amount normally requiretl, provitletl no changes have been or will be made in the original plans and specifcations and any suspension or abandonment has not exceeded one (1) year. If changes are made or if suspension or abandonment exceetls one (i) year, Full fees shall be paitl tor a new permit. (4) No work of any manner shall be done Ihat will change the natural Flow of water causing a drainage problem. (5) Contraclor shall notify the Building Inspector lwenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card before proceediing with successive phases o( the job. (6) The issuance oF a pertnit or the approval of drewings and speci5cations shall not he construed to be a pertnit for, nor an approval of, any violation of the provisions r~ of the building codes or any other ordinance, law, rule or regulation. I- Chief Building Inspector THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE Date : 7500 WEST 29TH AVENUE 98 WHEAT RIDGE, CO 80215 Property Owner: 9,4,1 ~1 'e T Property Address Phone : /~/u~ • /3 / Contractor License No. : Company : yy~ a„1c, F r.o, /Y P c Phone :`13v ,-Y5Y9 0 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value : I hereby certity that the setback distances proposed by this pertnk appliwtion are accurete, and do not violate appiieable ordinances, rules or regulations of the Ciry o( Wheat Ridge or covenants, easements or restrictions of record; that all measuremenls shown, and allegations made are accurete; that I have read and a4ree to abide by all conditions printed on this application, and that I assume tull responsibility for comphance with the Wheat Ridge Building Code (U.B.C.) and all other applicable Wheat fiidge ordinances, for work under this permit. (OWNER)(CONTRACTOR)SIGNED_924i2/!i&n f.L, DATE qg USB: Description : Approval: Zoning : ~fdfffgj~ Approval: ~061C~aKIR~fi~ Approval: Occupancy : Wails Electrical License No : .Z y6 $ Company: Expiration Date : Approval: BUIIDING DEPARTMENT USE ONLY SIC Permit Fee : Use Tax : / y~ Q= Total: $0.00 Sq. FL : Roof : Stories : Residential Units : Plumbing License No : Mechanical License No : Company: Company: Expiration Oate : Expiration Date : Approval: Approval: (7) Tnis pertnd was Issued In aaadance wdh Me provlsians selloM In yopur appira6on anE is suejea ro tlro laws W Ca Slate ol ColoraEO and to Vrc Zminp Regulauons an0 BuilOug Code of Wlieat Ridye, CobnEO a any oUxr applicaDle oNinancea of the Ciy. (4) Thia pemut slwll expire d(A) the worlc auUwnzeU Is ral commence0 wiNin sizty (80) days hom issue tlate or (B) Ua Wibirq aWmized is suspended u aEa'WOned lu a perlotl of 720 Oays. (J) It Nis pertril expires, a new pemul may De acaulred (or a lea ol one-hatt the amounl mmmaM rc7Wmd. piovided rw tlwrpea Iww been or witl be maCe N Vro uriginal planu and spedfiraliona and ury suspensbn a aEanOOnment tus not exceeaM one (t) year. li Uanqes are rtuEe a if suspension a abanaonmant ezceeEs wro (t) year, Nn lees ahall be peW !or a new permit (4) No wwk ol any manner ahall he tlpw ihat vrill tlwn0e Ihe na4ttal Ibw of waln nusing a d2inaqe problem. (5) Conlnctot s1uU twtiN the BuiWinq InaDettot lweny-four (24) houn in aCvance fa all mspeclions arW shall receive wrillen aOP~vaI on inspectian wrd belOro proceM urq wMh auccessWepha xs of Me~ob (e) 7M issuance ol a permit a the approvel o! C2wUpa and spedfitaUOns shall not Oe consWeO to Ee a pemiil lor, nor an aDWmi oL airy WdaUon of the provisbns a the buildirp wEes «airy oMer adinanea, Ww, rule w repulaUOn. Chief Building Inspector For Mayor THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION . ' DEPARTMENT OF PLANNING AND DEVELOPMENT BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Building Permit Number : 6818 Property Owner : Property Address : 7960 Melrose Drive Phone : 403-1314 Contractor License No. : 19912 Company : Metro Heating & Cooling, Inc. Phone : 366-7868 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT i hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restnctions of record; that all measurements shown, and allegations made are accurate; that I have read and ayree to abide by all condkions printed on this application, and that I assume fuq responsibihty for compliance with the Wheat Ridge Building Code (U.B.CJ and all other applieable Wheat Ktidge ordinances, for work under this permit. (OWNER)(CONTRACTOR) SIGNED DATE Construction Value Permit Fee Plan Review Fee Use Tax Total Date : 4/3/98 $1, 800.00 $57.75 $0.00 $27.00 $84.75 Use: Description : Install central air conditioning Electrical License No : Company : Plumbing License No : Company : Mechanical License No : Company: Expiration Date : Expiration Date : Expiration Date : Approval: Approval: Approval: (i) This permil was issuetl in acwrtlance with the provisions se[ forlh in yopur application antl is sub7ect to the laws of Me State of Coloretlo antl to the Zoning Regulations and Buildiny Code of VMeat Ridge, Colorado or any other applicable ordinances of the Cily. (2) This pertnit shall ezpire if (A) the work authonzed is not commence0 within sixry (60) days fmm issue date or (B) the building authorizetl is suspended or abantlonetl for a periotl of 120 days. (3) If ihis pertntt expires, a new permR may be acquiretl for a fee of one-haM ihe amount normally requiretl, provitled no changes have been or will be made in ihe original plans and speciflcations antl any suspension or abandonment has not exceeded one (t) year. If changes are made or if suspension or abandonmen[ exceeds one (1) year, full tces shall De paid far a new pertriit. (4) No woAc o( any manner shall be tlone Nat will change the natural flow of water causing a drainage problem. (5) Coniractor shall no4ry fhe 8uilding Inspector twenry-four (24) hours in aavance for all inspec[ions antl shall receive wntten approval on inspection card before proceetliing with successive~ phasas of the ~ob. ~(@) The issuance of a permit or fhe approval d2wings and specifications shall not be consW ed to be a permft for, nor an approval of, any violation of the provislons f of the Guilding codes pr anyother ortlinance, law, rule or requlation. ~ Chief BuTding Inspector THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION DEPARTMENT OF PLANNING AND DEVELOPMENT BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Building Permit Number : Date : Property Owner : &&,s, L, FlQ-lGk,~Z Property Address : ~%p pvtQ ( ~ ~ ~ ~ ~~~3 Phone : yp 3 / 3 /Y Contractor License No. LlGt l,~L Company : M ET2~? lJ~-~.u~ a,<_p 14faG Phone : 3(0(0 ` 7S69- OWNER/CONTRACTOR SIGNATURE OF AND AGREEMENT Construction Value : I hereby ceAify that the setback distances proposed by this pertnit application are accurete, and do not violate applieable ordinances, rules or regulations of the Ciry of Wheat Ridge or covenants, easements or restridions of record; lhat all measurements shown, and allegations made are accurate; that I have read and a9ree to abide by all eonditions printed on this appliwtion, and that I assume full responsibil'Ry tor compliance with the Wheat Ridge Building Code (U.B.C.) and all other applicable W~eat Ridge ordinang", for work under this permit. (OWNER)(CONTRACTOR) Permit Fee : S-1 _ 7 S Use Tax : Total: $0.00 Use: BUILDING DEPARTMENT USE ONLY SIC : Sq. FL : Approval: Zoning : Approval : I APProval: Occupancy : Walls : Roof : Stories : Residential Units : Electrical License No : Plumbing License No : Mechanical License No : Company: Company: Company: Expiration Date : Expiration Date : Expiration Date : Approval: Approval: Approval: (t ) This pertnil was issuetl i^ aaadance wilh the pmWSions set IaN In yopur application and is subieU ro Me laws of the State ol CabraEO and W Me Zoninq RegulaGons anE Bultliny Code of Wheat Ridge, Cobrado a any oNer applinde ortlinances o( the Ciry. (Y) This pertriil sfuH expire A(A) the vrork auNOnzed la nol corntrenced wMln sixry (60) Cays hom issue Cate or (8) the Wildlnp aWwrize0 is suspended u aEanOoned lu a peAaE ot 120 days. (J) If Nis pemtil expires, anew pertrvt may be aWuired fa a fee ol ono-Aatl Ne amount nomuly reyuired, proMed no Wnges hava baen a will be made in the original pWns and apeaf"tians enE wry wspension or aOaiWOnment has'wt exceetled one (t) year. it duipes ara maae w H wspenabn «aOanCOnmant ezceetls ona (1) year, Nu /ees shall be paW la a new peimiL (4) No work a( airy manner shaU be dane Ihal will change the natural flow ol water causing a d2inaqe problem. (5) Conuacta shali noUry the Buiainq Inspedor twenry-tour (24) hours in aEvaMe lor all mspenions anC stwil receNa writlen approval on Inspation raN ENOre pnceeCiinp wnn suaessWeWw xs of tlieIob (e) The issuance ol a pertrvl a the appoval olCrowinqs aM spetlfra6ons shall rot De consUUeE m be a pemul fa, nor an approval of, any vblatlon ol Me proWSbna . U the OuiWinp [odes a anY oUwf ordin0nce. law.'ule a repuW4on. Chief Building Inspector Description :~,~~.i,q// O For Mayor THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION