Loading...
HomeMy WebLinkAbout3301 Vivian DriveThe City of Wheat Ridge Third Party Form Check List Property Address 3301 Vivian Dr Wheat Ridge CO 80033 Permit Number 201803000 Permit Issued Date 11/13/2018 Owner Information Property Owner Information Bernadette Whitney Property Owner Address 3301 Vivian Dr Inspector Information Inspection Company Certified Building Consultants Inspector Name Kraig Stanforth;Travis Stanforth Inspector Contact info. 720-940-1180 TStanforthCBC aC 2gmail.com Inspector Statement of Acknowledgemen# *1 hereby acknowledge the roof I am inspecting is 6/12 or over. All roofs that are under 6/12 must be inspected by the City of Wheat Ridge Building Department. *1 hereby acknowledge the roofing system for the referenced building has been inspected and found to be in compliance with the minimum requirements of the 2012 IRC and 2012 IBC as well as the City of Wheat Ridge Policies and Procedures and manufacturer's reco tionsa. i ions. Inspector: lti Date:1'� Pr Owner Statement of Acknowledgement *1 hereby acknowledge that I am the owner of the building referenced above and I give my consent for the listed third -party inspection company to perform my roof inspection in lieu of the City of Wheat Rice Building vision inspection. Property Owner/Agent: Date: This original document, as well as the roo checklist, must be submitted to the Chief Building Official within seven days of the final inspection. Drop off in person Permit Counter 2nd Floor 7500 W. 29th Ave Wheat Ridge, CO 80033 Submit via Email Kcooka-ci.wheatridge.co. us CBC Wheat Ridge Roof Inspection Packet Page 2 of 6 N/A ❑ Pass ❑ Fail Metal roof shingles shall not be installed on slope less than 3:12 N/A ❑ Pass ❑ Fail Metal valley flashing shall be the same material as roof N/A ❑ Pass ❑ Fail Metal valley flashing shall extend a min. of 8" from the centerline with a min. of 3/4 " high splash diverter rib built-in at the flow line with the sections overlapping a min. of 4" Tile Roof Requirements N/A ❑ Pass ❑ Fail Clay and concrete tile shall have a min. 2-1/2:12 slope N/A ❑ Pass ❑ Fail Slopes 4:12 and under require double underlayment CBC Wheat Ridge Roof Inspection Packet Page 3 of 6 The City of Wheat Ridge Inspection Check List Notes Mid-Roof Roof Inspection ❑ N/A Pass ❑ Fail Structural roof components ❑ N/A Pass ❑ Fail Verify that no more than 2 layers of shingles exist ❑ N/A Pass ❑ Fail Flashing for roof and walls N/A ❑ Pass ❑ Fail If new sheathing is installed, verify that it is listed in the permit description (Valuation must be adjusted) N/A ❑ Pass ❑ Fail Verify sheathing nail pattern (see Policy and Procedures) ❑ N/A N/A ❑. Pass Pass ❑ ❑ Fail Fail Crickets and saddles where needed Verify vent must have boot same gauge as pipe ❑ N/A Pass ❑ Fail Verify vent caps ❑ N/A Pass ❑ Fail Verify no flashings are damaged or rusted ❑ N/A Pass ❑ Fail Step flashing shall be min. of 4x4 piece per shingle ❑ N/A Pass ❑ Fail Verify scuppers allow for proper drainage ❑ N/A Pass ❑ Fail Ice and water shield 2' in heated wall spaces ❑ N/A Pass ❑ Fail Underlayments must follow 2012 IRC/2012 IBC ❑ N/A Pass ❑ Fail Verify roof slope for proper damage ❑ N/A Pass ❑ Fail Dripedge shall have min. of 2" overlap ❑ N/APass ZK ❑ Fail Dripedge should extend down min. 2" past roof deck ❑ N/A X Pass ❑ Fail Dripedge shall be mechanically fastened 12" OC N/A ❑ Pass ❑ Fail 90 LB roof roofing shall not be applied to roof slopes less than 2:12 slope. Exception, detached garages, patios, carports, open on three sides with min. slope of 1:12 N/A ❑ Pass ❑ Fail Above roof insulation R-25 N/A ❑ Pass ❑ Fail Below roof residential R-38 N/A ❑ Pass ❑ Fail Below roof commercial R-32 N/A ❑ Pass ❑ Fail Modified Bitumen, EPDM, TPO min. slope 1/4:12 slope must be installed in accordance with the manufacturer's specifications. Must have manufacturer's letter of warranty with the address on the letter for final inspection Metal Roof Shingles Requirements N/A ❑ Pass ❑ Fail Metal roof shingles shall not be installed on slope less than 3:12 N/A ❑ Pass ❑ Fail Metal valley flashing shall be the same material as roof N/A ❑ Pass ❑ Fail Metal valley flashing shall extend a min. of 8" from the centerline with a min. of 3/4 " high splash diverter rib built-in at the flow line with the sections overlapping a min. of 4" Tile Roof Requirements N/A ❑ Pass ❑ Fail Clay and concrete tile shall have a min. 2-1/2:12 slope N/A ❑ Pass ❑ Fail Slopes 4:12 and under require double underlayment CBC Wheat Ridge Roof Inspection Packet Page 3 of 6 Company Name: Inspector Signature: Date of Inspection: The City of Wheat Ridge Inspection Check List Notes Mid -Roof Certified Buil Notes CBC Wheat Ridge Roof Inspection Packet Page 4 of 6 The City of Wheat Ridge Inspection Check List Notes Final Roof Roof Inspection ❑ N/A Pass ❑ Fail Structural roof components ❑ N/A Pass ❑ Fail Verify that no more than 2 layers of shingles exist ❑ N/A Pass ❑ Fail Flashing for roof and walls ❑ N/A D( Pass ❑ Fail Structural roof components ( N/A ❑ Pass ❑ Fail If new sheathing is installed verify that it is listed in the permit description (Valuation must be adjusted) y, N/A ❑ Pass ❑ Fail Verify sheathing nail pattern (See Policy and Procedures) N/A ❑ Pass ❑ Fail Crickets and saddles where needed ❑ N/A Pass ❑ Fail Verify B vent must have boot same gauge as pipe ❑ N/A Pass ❑ Fail Verify vent caps ❑ N/A Pass ❑ Fail Verify no flashings are damaged or rusted ❑ N/A Pass ❑ Fail Step flashing shall be min. of 4x4 piece per shingle ❑ N/A Pass ❑ Fail Verify scuppers allow for proper drainage ❑ N/A Pass ❑ Fail Ice and water shield 2' in heated wall spaces ❑ N/A Pass ❑ Fail Underlayments must follow 2012 IRC/2012 IBC ❑ N/A Pass ❑ Fail Verify roof slope for proper drainage ❑ N/A Pass ❑ Fail Dripedge shall have min. 2" of overlap ❑ N/A Pass ❑ Fail Dripedge should extend down min. 2" past roof deck ❑ N/A Pass ❑ Fail Dripedge shall be mechanically fastened 12" OC N/A ❑ Pass ❑ Fail 90 LB roll roofing shall not be applied to roof slopes less than / 2:12 slope: Exception, detached garages, patios, carports, open on three sides with min. slope of 1:12 N/A ❑ Pass ❑ Fail Modified Bitumen, EPDM, TPO min. slope 1/4:12 slope must be installed in accordance with the manufacturer's letter of warranty with the address on the letter for final inspection Metal Roof Shingles Requirements N/A ❑ Pass ❑ Fail Metal roof shingles shall not be installed on slope less than 3:12 N/A ❑ Pass ❑ Fail Metal valley flashing shall be the same material as roof N/A ❑ Pass ❑ Fail Metal valley flashing shall extend a min. of 8" from the centerline with a min. of 3/4 " high splash diverter rib built-in at the flow line with the sections overlapping a min. of 4" Tile Roof Requirements N/A ❑ Pass ❑ Fail Clay and concrete tile shall have a min. 2-1/2:12 slope N/A ❑ Pass ❑ Fail Slopes 4:12 and under require double underlayment CBC Wheat Ridge Roof Inspection Packet Page 5 of 6 The City of Wheat Ridge Inspection Check List Notes Final Roof Notes Company Name: Certified Building Consultants Inspector Signature: Date of Inspection: CBC Wheat Ridge Roof Inspection Packet Page 6 of 6 City of Wheat Ridge Residential Roofing PERMIT - 201803000 PERMIT NO: 201803000 ISSUED: 11/13/2018 JOB ADDRESS: 3301 Vivian Dr EXPIRES: 11/13/2019 JOB DESCRIPTION: Reroof remove and install GAF Timberline HD Asphalt Shingles with 31 squares. Pitch 4/12. House. *** CONTACTS *** OWNER OSTERTAG LIVING TRUST CON (3 03) 842 -77 68 Bernadette Whitney SUB (303)332-6224 Chuck Gardner 021423 Gardner Contracting LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 10,075.00 FEES Total Valuation 0.00 Use Tax 211.58 Permit Fee 220.15 ** TOTAL ** 431.73 *** COMMENTS *** *** CONDITIONS *** Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be required for both the midroof and final inspections. The 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec. R806. The installation of ridge venting requires the installation or existence of soffit venting. For calculation purposes, one hat or turtle vent equal to one-half of one square foot of opening. Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75% of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75% of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201803000 PERMIT NO: 201803000 ISSUED: 11/13/2018 JOB ADDRESS: 3301 Vivian Dr EXPIRES: 11/13/2019 JOB DESCRIPTION: Reroof remove and install GAF Timberline HD Asphalt Shingles with 31 squares. Pitch 4/12. House. I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this�ppermit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be pertgrn�ed anan'd/t/h all w rk to perform is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CVNTRACTOR (Circle one) Date l . This pen -nit was issued bas'`ed on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of aIl required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any applicable code or a'y ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. From: no-reply@ci.wheatridge.co.us Sent: Tuesday, November 13, 2018 12:38 PM To: CommDev Permits Subject: Online Form Submittal: Residential Roofing Permit Application Categories: Gina Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. The Building Division permit counter is open from 7:30 am to 3:30 pm, Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address Property Owner Name 3301 Vivian Dr Bernadette Whitney Property Owner Phone 303-842-7768 Number (enter WITH dashes, eg 303-123-4567) S43'1J� Property Owner Email heathers@gardner-contracting.com Address Do you have a signed Yes contract to reroof this property? Applications cannot be submitted without an executed contract attached below. Attach Copy of Executed signed contract.pdf Contract CONTRACTOR INFORMATION Contractor Business Gardner Contracting Name Contractor's License 021423 Number (This is a 5 or 6 digit number for the City of Wheat Ridge) Contractor Phone 3033326224 Number (enter WITH dashes, eg 303-123-4567) Contractor Address 909 Telluride St aurora co 80011 (Primary address of your business) Contractor Email Address production@gardner-contracting.com Retype Contractor Email production@gardner-contracting.com Address DESCRIPTION OF WORK TOTAL SQUARES of 31 the entire scope of work: Project Value (contract 10075 value or cost of ALL materials and labor) Are you re -decking the No roof? Is the permit for a flat Pitched roof (2:12 pitch or greater) roof, pitched roof, or 2 both? (check all that apply) What is the specific pitch of the PITCHED roof? How many squares are part of the PITCHED roof? Describe the roofing materials for the PITCHED roof: Type of material for the PITCHED roof. Provide any additional detail here on the description of work. (Is this for a house or garage? Etc) 4:12 31 �-- GAF Timberline HD Asphalt Tear off and reroof house SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal 3 owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Person Applying for Heather Sutcliffe Permit Email not displaying correctly? View it in your browser. 11/23/2009 MON 10:15 FAX 303 237 8929 303 Best Way 01002 /002 INSPECTION RECORD OccupancVlType 'INSPECTION LINE: (303) 234 -5933 Inspections will not be made unless this card is posted on the building site Call by 3:00 PM to receive inspection the following business day. 4 INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB ION INSPECTIONS DATE INSPECTOR INITIALS COMMENTS: aissons ie W INSPECTIONS (CEG) Concrete round Mid-Roof or Monolithic rvice =PJum of / French Drain ric ice Lines bing__.._.. .. _... _.._ ..... _. _. _ ..... Water Service Lines Gas Pipin g CONCRETE SLAB FLOOR Electrical (Underground) Plumbing (Underground) Heating (Underground) I ROUGHS ie Mid-Roof rvice =PJum ric bing__.._.. .. _... _.._ ..... _. _. _ ..... _ .. Gas Pipin g Rough Mechanical ABOVE INSPECTIONS i0 BE SIGNED PRIOR TO :'rC '::i::i.v ;'r:'.; Framing _ CITY OF NNEAT RiliBE Insulation %` 11/23703 8:04 AN edbh Drywall Screw n _...._ ___....__ ...._...__._. Casey CB1Yirt . - RECEIPT NO:C]IM396 _- ......ANOWT. FINALS SPSP Reroof 41 sqs 47505 -.... Electrical -- Permit Fee _ _. 272.19 -- - -..Use Tax- ..__.. ... 202.95 Plumbing Mechanical PAMT RECEIM _ MOUNT 5177 . .. . 475.05_ .: Roof ._ -- ...4S. _ .... .. puth Code: . _..........086768.. _ -... - _- ......._ ........ .... _: Building Final TOTAL 475.05 Fire Department R.O:W & Drainage - INSPECTIONS FOR PLANNING & ZONING FIRE AND PUBLICE WORKS Parking & Landscaping I SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS. "NOTE: ALL ITEMS MUST BE COMPLETED AND APPROVED BY PLANNING AND ZONING, BUILDING AND PUBLIC WORKS BEFORE A i CERTIFICATE OF OCCUPANCY IS ISSUED. FINAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTE AUTHORIZATION OFA CERTIFICATE OF OCCUPANCY NOR PERMISSION FOR OCCUPANCY. OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF OCCUPANCY.IS ISSUED ♦ i CITY OF WHEAT RIDGE Building Inspection Division I (303) 234 -5933 Inspection line (303) 235 -2855 Office • (303) 237 -8929 Fax INSPECTION NOTICE Inspection Type: Mll ' •IrP6 Job Address: 3)1N M'ul'l rn Vr Permit Number: CITg flJli(y o El No one available for inspection: Time ;C) AM�PM Re- Inspection required: Yes Mo *When corrections have been made, call for re -ins ection at 303 - 234 -5933 Date: 1 r�, f q q Inspector: r DO NOT REMOVE THIS NOTICE ~L nom. p ♦ i CITY OF WHEAT RIDGE - Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: ~swrL Job Address: -M)l Permit Number: O9?2 I i i I I ;,W AM/PM ❑ No one available for inspection: Time ~~!°=1 Re-Inspection required: Yes No.1 *When corrections have been made, calf for re -inspection at 303-234-5933 Date: in Inspector: _ DO NOT REMOVE THIS NOTICE w! r ern . r•' INSPECTION RECORD OccupancvlType INSPECTION LINE: (303) 234-5933 inspections-will not-be-made unless this card-is posted off-the building site Call by 3:00 PM to receive inspection the following business day. INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB FOUNDATION INSPECTIONS DATE INSPECTOR INITIALS COMMENTS: Footings/Caissons Stemwall / (CEG) Concrete Encased Ground Reinforcing or Monolithic Weatherproof/ French Drain Sewer Service Lines Water Service Lines CONCRETE SLAB FLOOR Electrical (Undergroun, Plumbing (Undergroun Heating (Underground) ROUGHS Sheathing Lath / Wall tie Mid-Roof Electrical Service Rough Electric Rough Plumbing Gas Piping Rough Mechanical Framing Insulation Drywall Screw FINALS Electrical UNTIL ABOVE HAS BEEN UNTIL TO BE SIGNED PRIOR TO CITY OF WHEAT RIDGE 11/23109 8:04 HN edbb Casey Colvin RECEIPT NO:CD0003396 AMOUNT RPSP Reroof 41 sqs 475.05 094200 Permit Fee 272.10 Use Tax 202.95 _ Mechanical PAYMENT RECEIVED - AMOUNT Roof VS 5177 475.05 8uth Code: Building Final - -086788 TOTAL 475.05 _ Fire Department R.O:W & Drainage INSPECTIONS FOR PLANNING S ZONING, FIRE AND PUBLICE WORKS Parking & Landscaping SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS. `NOTE: ALL ITEMS MUST BE COMPLETED AND APPROVED BY PLANNING AND ZONING, BUILDING AND PUBLIC WORKS BEFORE A CERTIFICATE OF OCCUPANCY IS ISSUED. FINAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTE AUTHORIZATION OF A CERTIFICATE OF OCCUPANCY NOR PERMISSION FOR OCCUPANCY. OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF OCCUPANCY IS ISSUED `1, A41 City of -16 ,VrWh6atfUdge CCIAAM1TMTTv ntArPrnDAd"C nr'r Building Division 7500 W. 29th Ave., Wheat Ridge, CO 80033 Office: 303-235-2855' Fax: 303-237-8929 Inspection Line: 303-234-5933 Property. Address: Property Owner (pte Mailing Address; (if different than property address) Address: Date: Permit State, Contractor: Contractor License #:0770 1 -25 -7 V Phone: 303 g-~= 7 76(oS Use of space (description): Description of work: Ptan Review (due at time of submittal): 3 Sq, Ft./L.Ft added: Squares_qj_ BTU's Gallons Amps OWNERICONTRAOTORSIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this penult application art accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and aggree to abide by all conditions printed on this application and that I assume full responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for work under this permit. Plans subiec lion. CIRLCE ONE:: (OWNER) (CONTRACTOR) or PERSONAL REP SAEN,TATIVE of (OWNER) (CONTRATOR) o+ Q PRINT NAM SIGNATURE: Al-l Date: IQ / Credit Card ayment: Use credit card listed on fit Date: 0.I I L I Print name. Signature: it Ze/Ze 39ttd d]]IW3bd L8EEZGZC0C LT:LO 600ZICZITT Facsimile Building Permit Application