Loading...
HomeMy WebLinkAbout10505 W. 34th Avenue♦��4_ City at�id� e �co MUNITY DEVELOPMENT " City of Wheat Ridge Municipal Building 7500 W. 29th Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2846 F: 303.235.2857 July 23, 2024 OFFICIAL ADDRESS CHANGE NOTIFICATION is hereby given that the following address has been assigned to the property/properties as indicated below: NEW ADDRESS: 10535 West 34' Avenue CURRENT ADDRESS: 10505 West 34t' Avenue • Rolling Hills Blks 6-8 Subdivision, Lot 16, Section 28, Parcel 4: 39-281-16-015 NOTES: This is a courtesy notification. I• AUTHORIZED BY: DATE: 7/23/24 DISTRIBUTION: 1. Property Owner 2. Addressing(Ljeffco.us Jefferson County Assessor: Data Control, Lacey Baker; Jefferson County Elections: Holly Roth; Jeffco IT Services (Mapping): Steve Mitchel 3. Jeffco Public Schools, ATTN: Communication Services, 1829 Denver West Dr., Bldg. 27, Golden, CO 80401 4. U.S. Post Office, 4210 Wadsworth Blvd., Wheat Ridge, CO 80033 5. Email to kent.j.christiansenkusps.gov; mariann.szaszkusps. og_v; carmen.s.suarezkusps. og_v; there sa.a.kraftkusps.gov; Jennifer.m.sanchezkusps. og_v 6. Xcel Energy, gary.d.motsingerkxcelenerg_y com 7. Century Link, elvis.molinalkcenturylink.com 8. Comcast, scott moorekcable.comcast.com 9. Consolidated Mutual Water Company: engineering_kcmwc.net 10. Westridge Sanitation District: office( a �westridgesanitationdistrict.com 11. Jeffcom: cadupdateskj effcom9l Lorg 12. Fire Dept: planreviewkwestmetrofire.org 13. Wheat Ridge Planning Division 14. Wheat Ridge Building Division 15. GIS Specialist 16. Log File NOTE: Please notify all other parties concerned. ADDRESS MAP UPDATED BY: DATE: www.ci.wheatridge.co.us M A i CITY OF WHEAT RIDGE _:�9rBuilding Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE t Inspection Type: M \ D .,l Job Address: /05, U 5 V+' Permit Number: 1 fi 1 -7 o '� /J b L -A /1 r -)-e rz 6 N S; �- c - ❑ No one available for inspection: Time f /,/v AM/PM Re -Inspection required' Ye No When corrections have b de, call for re -in,, ton t 303-234-5933 Date: " Inspector: -- DO NOT REMOVE THIS NOTICE City of Wheat Ridge Residential Roofing PERMIT - 201702422 PERMIT NO: 201702422 ISSUED: 06/23/2017 JOB ADDRESS: 10505 W 34th AVE EXPIRES: 06/23/2018 JOB DESCRIPTION: Residential Re -roof to install Owens Corning Duration asphalt shingles 28.94 sq. *** CONTACTS *** OWNER (720)365-7760 POMEROY ZACH AND BRENDA SUB (303)694-4363 Glen & Sandra Thiessen 140071 Thiessen Const. & Roofing *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 13,174.89 FEES Total Valuation 0.00 Use Tax 276.67 Permit Fee 267.70 ** TOTAL ** 544.37 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding A�4-inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturers€'"s installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer&#39;s technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. � 2c12z- INSPECTION RECORD RM: http://www.ci.wheatridge.co.us/forms.aspx?fid=79 INSPECTION REQUEST LINE: (303) 234-5933 Inspections will not be performed unless this card is posted on the project site. Call the inspection request line before 11:59 p.m. to receive an inspection the following business day.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Initials Comments Pier Comments Concrete Encased Ground (CEG) Lath / Wall Tie Foundation / P.E. Letter Sewer Service Do Not Pour Concrete Prior 10 Approval Ur I ne ADove 1n5pect1Un5 Underground/Slab Inspections Date Inspector Initials Comments Electrical Lath / Wall Tie Sewer Service Rough Electric " Plumbing Rough Plumbing/Gas Line r%— Kl�# i`r.vnr 1 Inrinrnrni inr1 nr RaInw/In_Slah Work Prior 10 ADDrovallUi I ne ADOve inspections Lr., ...,....,..,. Rough Inspections Date Wall Sheathing Inspector Initials Comments Mid -Roof Lath / Wall Tie Rough Electric " Rough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw / Nail Final Inspections Date Inspector CommentsInitials Landscaping & Parking/ Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing Final Mechanical Roof Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. *For low voltage permits — Please be sure that rough inspections are compieiea From the Fire v15u1ci aiw eleculcal low vvnage by the Building Division. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather `1 INSPECTION RECORD INSPECTION REQUEST LINE: (303) 234-5933 Occu�an�v/Te Inspections will not be performed unless this card is posted on the project site. Call the inspection request line before 11:59 p.m. to receive an inspection the following business day.** Inspector Must Sign ALL Spaces pertinent to this project Foundation Inspections Date Inspector Comments Initials Pier Concrete Encased Ground (CEG) Plumbing Foundation / P.E. Letter UO im0i ii -our unnCPP_iP- wrinr ii n A& rnvni cit 1 ho ahnvn incnn.+fir%n� Underground/Slab Inspections Date Inspector Initials Comments Electrical Wall Sheathing Sewer Service Mid -Roof Lath / Wall Tie Plumbing �1�>\V1��1�1'[at�l�[![:7ClIC�I�I�[�<�tr:T:]r�i+J/11��1F1�1+�+riT�7JiiTiTin+ .\'T.1'T.lTE7t�ii�T�.\:T1177 . Rough Inspections Date Inspector Initials Comments Wall Sheathing Mid -Roof Lath / Wall Tie Rough Electric Rough Plumbing/Gas Line Rough Mechanical Rough Framing Rough Grading Insulation Drywall Screw/ Nail Final Inspections Date Inspector Initials Comments Landscaping & Parking / Planning Dept. Inspections from these entities should be requested one week in advance. For landscaping and parking inspections call 303-235-2846. For ROW and drainage inspections call 303-235-2861. For fire inspections contact the Fire Protection District for your project. ROW & Drainage / Public Works Dept. Floodplain Inspection (if applicable) Fire Inspection / Fire Protection Dist. Final Electrical Final Plumbing Final Mechanical Roof Final Window/Doors Final Building NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy. WA WWW .qy� VVI IIuw - r icaac uc Z)uIc uiai iuuyii uispeuwnb are uumpietea from the rare uistnct ano electrical low voltage by the Building Division. For notification of your assigned inspection time window please email insptimerequest(LI)ci.wheatridge.co.us by 8:00 A.M. the day of the inspection with the property address in the subject line of the email. Time windows are assigned based on inspection routing. Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued Protect This Card From The Weather City of Wheat Ridge v it Residential Roofing PERMIT - 201701858 PERMIT NO: 201701858 ISSUED: 06/11/2017 JOB ADDRESS: 10505 W 34th AVE EXPIRES: 06/11/2018 JOB DESCRIPTION: Residential Reroof: Tear off and reroof house and shed with GAF American Harvest color: Amber Wheat 5/12 pitch 40.33 squares. *** CONTACTS *** OWNER (303)232-3109 ROONEY YVONNE M LINTHWAITE SUB (303)804-0303 Tom Brown 070055 North West Roofing *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISIOPT CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 / i *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 17,460.12 FEES Total Valuation 0.00 Use Tax 366.66 Permit Fee 331.10 ** TOTAL ** 697.76 *** COMMENT: *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved. midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding A/2 -inch exists. Asphalt shingles are required to be fastened to the roof deck with a mini hinale Ice and water shield is e Eave and rake metal is required. A ladder extending 3 feet above the roofe ?e secured in place is required to be provi 1 roof inspections. Roof v *' is require to comply wit app ica e codes and/or manufac allation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer&#39;s technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201702422 PERMIT NO: 201702422 ISSUED: 06/23/2017 JOB ADDRESS: 10505 W 34th AVE EXPIRES: 06/23/2018 JOB DESCRIPTION: Residential Re-roof to install Owens Corning Duration asphalt shingles 28.94 sq. *** CONTACTS *** OWNER (720)365-7760 POMEROY ZACH AND BRENDA SUB (303)694-4363 Glen & Sandra Thiessen 140071 Thiessen Const. & Roofing *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 13,174.89 FEES Total Valuation 0.00 r.^. Use Tax 276.67-- Permit Fee 267.70 ** TOTAL ** 544.37 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding A34-inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturera€TMs installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer&#39;s technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT -201702422 PERMIT NO: 201702422 ISSUED: 06/23/2017 JOB ADDRESS: 10505 W 34th AVE EXPIRES: 06/23/2018 JOB DESCRIPTION: Residential Re -roof to install Owens Corning Duration asphalt shingles 28.94 sq. 11 by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with thisermit. I further attest that I am le lly authorized to include all entities named within this document as parties to the work to be performed and thavafn wgrk to be gp orhoed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of 6WNER or CONTRACTOR (Circle one) Date I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3 If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any applicable code or any ordinance or regulation of this j Wrisdiction. Approval of work is subject to Held inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line. Antoinette Kulick �La (_� G ?IY22- From: no-reply@ci.wheatridge.co.us Sent: Tuesday, June 13, 2017 7:36 AM To: Permits CommDev Subject: Online Form Submittal: Residential Roofing Permit Application Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. Permits are currently being processed within 3-5 business days, subject to change based on volume. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number Property Owner Email Address Do you have a signed contract to reroof this property? It will need to be provided at the time of permit pick-up. 10505 W 34th Place Zach and Brenda Pomeroy 720-365-7760 Field not completed. Yes CONTRACTOR INFORMATION Contractor Name Contractor's License Number (for the City of Wheat Ridge) Contractor Phone Number Thiessen Construction and Roofing 140071 303-694-4363 Contractor Email Address Office.thiessenroofing@gmail.com (permit pick-up instructions will be sent to this email) Retype Contractor Email Off ice.thiessenroofing@gmail.com Address DESCRIPTION OF WORK Is this application for a new permit for a residential root? Are you re -decking the roof? Description of Roofing Material Select Type of Material: If "Other" is selected above, describe here: Yes No Owens Corning Duration Shingles Asphalt Field not completed. How many squares of the 28.94 material selected above? Does any portion of the property include a flat roof? If yes, how many squares on the flat roof? Field not completed. TOTAL SQUARES of all 28.94 roofing material for this project 2 Provide additional detail here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract value or cost of ALL materials and labor) Re -Roofing house, 3/12 Pitch 13,174.89 SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant Sandra Thiessen Email not displaying correctly? View it in your browser. 3 6-l�Z6 im a0 Date Customer J o saw 1.�. 3y->� �.�a-c.>✓ Address 1Z 4 un- Dt.-E- C • k00 3 City State zip ?a0- - 03oy Phone Email Insurance Company Claim # ,r\ CHITUEISS& OEN R G 8200 S. Quebec St. #A3-502 Office: 303-694-4363 Centennial, CO 80112 Fax: 303-779-1377 A Colorado Licensed Specialty Contractor Insured by: Affordable American Insurance 303-795-5242 Thiessen Construction and Roofing (TCR) shall hold in trust any payment received until the materials have been delivered to the property above or the majority of the work has been completed. Colorado Law grants the homeowner a three (3) day Right of Rescission (See back for more information). By Colorado Law; TCR cannot pay, waive, rebate or promise to pay, waive or rebate all or part of any deductible applicable to the claim for roofing work on the covered residential property. Permit Furnished: --------------- S Grade/MFG of Shingle: !a Shingle Color & Qty: r Ridge Material & Qty: Q�a �'�G� g, Valleys/ Qty:3'81, a Tear Off Qty & Number of Layers: ZAymz Pitch: V2 Stories: ( 2 3 151b Felt: L d 30fla-Fek- Plumbing Boot Jacks:l11_ Vent Caps & Collars: _ �_ '111_ ri fir' r Ice/Water Shield & Qty: Drip Edge/Flashings:JYJ� _ 2 "X'f Gutters & Downspouts Qty: e k) — �M&Wa Al Skylights: Attic Vents: Special Decking Requirements: Windows & Screens: ------------- Siding &Trim: Siding&Trim: .---------- 1�5i7�1 Painting & Misc.: ---------fSf/`7/1?z� Scope of Work/Special Instructions: r Contract Amount: _ _ _ _ _ _ _ _ - _ _ - _ $ Z,4 Remove Demolished Debris from Roof, Yard and Gutters Protect Landscaping ( Where Necessary) Date to Begin ------------------ Payment: 44 R -a I-atff _________________Payment:-wo-Faei alance upon receipt of funds from the insurance company This agreement is for the full scope of the insurance proceeds and is subject to the insurance company approval. By signing this agreement the customer is authorizing Thiessen Construction and Roofing (TCR) to pursue the customer's best interest in all repairs at a price agreeable to the insurance company and TCR. The only cost to the customer is the deductible and any agreeable upgrades. The final cost agreed upon by the insurance company and TCR shall be the final contract cost. All work is guaranteed to be free of defect from installation and workmanship for a period of five (5) years. 5- Z Qt -4— (o I �ust Sign ur Date TCR Authorized Agent Signature Date City of Wheat Ridge Residential Roofing PERMIT - 201701858 PERMIT NO: 201701858 ISSUED: 06/11/2017 JOB ADDRESS: 10505 W 34th AVE EXPIRES: 06/11/2018 JOB DESCRIPTION: Residential Reroof: Tear off and reroof house and shed with GAF American Harvest color: Amber Wheat 5/12 pitch 40.33 squares. *** CONTACTS *** OWNER (303)232-3109 ROONEY YVONNE M LINTHWAITE SUB (303)804-0303 Tom Brown 070055 North West Roofing *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 17,460.12 FEES Total Valuation 0.00 Use Tax 366.66 Permit Fee 331.10 ** TOTAL ** 697.76 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) requires an approved inspection prior to installation of ANY roof coverings and is require on the entire roof when spaced or board sheathing with ANY gap exceeding A/2 -inch exists. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturera€'"s installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer&#39;s technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201701858 PERMIT NO: 201701858 ISSUED: 06/11/2017 JOB ADDRESS: 10505 W 34th AVE EXPIRES: 06/11/2018 JOB DESCRIPTION: Residential Reroof: Tear off and reroof house and shed with GAF American Harvest color: Amber Wheat 5/12 pitch 40.33 squares. I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I , the legal owner or have been authorized by, the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with thispennrt. l further attest that -1 am le aUy authorized to include all entities named within this document as parties to the work to be performed 2nd tha 1 w to be per ri . -d is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of ER or CONTRACTOR (Circle one) 'Date 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3, If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of an manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of al] required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval many violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subje field inspectiar"" to a Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Inspection time requests will be accepted by email only. Please email requests to insptimerequest@ci.wheatridge.co.us between 7:30am and 8:00am, the morning of the inspection. Please put the address of the inspection in the subject line. Antoinette Kulick I From: no-reply@ci.wheatridge.co.us Sent: Thursday, June 8, 2017 9:09 AM To: Permits CommDev Subject: Online Form Submittal: Residential Roofing Permit Application Residential Roofing PP Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in t" the order they are received. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your �' 0 contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. Permits are currently being processed within 24-48 hours, subject to change based on volume. c For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Existing permits that require amendments (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. PROPERTY INFORMATION Property Address 10505 W 34TH AVE Property Owner Name ALBERT ROONEY Property Owner Phone 303-232-3109 Number Property Owner Email Field not completed. Address Do you have a signed Yes contract to reroof this property? It will need to be provided at the time of permit pick-up. CONTRACTOR INFORMATION Contractor Name NORTHWEST ROOFING 4 Contractor's License Number (for the City of Wheat Ridge) Contractor Phone Number 070055 303-804-0303 Contractor Email Address Ihammons@northwest-roofing.com (permit pick-up instructions will be sent to this email) DESCRIPTION OF WORK Is this application for a Yes new permit for a residential roof? Are you re -decking the Yes roof? Description of Roofing GAF - AMERICAN HARVEST COLOR AMBER WHEAT Material How many squares of 40.33 material? Provide additional detail Tear off and reroof house & shed, 5/12 pitch here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) Project Value (contract 17460.12 value or cost of ALL materials and labor) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a z permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. Name of Applicant Leila Hammons Email not displaying correctly? View it in your browser. i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Job Address: V �U �% _64 h Permit Number: 2U_7 bl ❑ No one available for inspection.- Time J AM/PM Re -Inspection required: Yes "When correct'ons h ve been made, call for re -inspection at 303-234-5933 Date: 7 Inspector: 0 O NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line __:�9�(303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: �-1 I Job Address: j Vsys W. J h Permit Number: 2b(_7 ❑ No one available for inspection" Time J AM/PM Re -Inspection required: Yes No *Whencorrect"ons h ve been made, call for re- inspection at 303-234-5933 Date: , -` Inspector:T O NOT REMOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Job Address: (6sq vi `a Permit Number: 1701 X`qo one available for inspection: Time M/ M Re -Inspection required: Yes oNo When corrections have been made, call for re-i,s pection at 303=234-5933 Date: X i %/ T Inspector: DO NOT REMOVE THIS NOTICE ♦ i CITY OF WHEAT RIDGE Building Inspection Division (303) 234 -5933 Inspection line (303) 235 -2855 Office • (303) 235 -2857 Fax INSPECTION NOTICE Inspection Type: X racs#� Job Address: 10' `— " % e Permit Number: ❑ No one available for inspection: Time AM /PM Re- Inspection required: Yes No 'When corrections have been made, call for re- inspection at 303 -234 -5933 Date Inspector: 0 0 NOT REMOVE THIS NOTICE ♦ ♦ CITY OF WHEAT RIDGE V, "�- Building Inspection Division (303) 234-5933 Inspection line (303) 235 -2855 Office • (303) 235 -2857 Fax INSPECTION NOTICE Inspection Type: A A !!k) I Job Address: Permit Number: fi tr ? �7 ❑ No one available for inspection: Time ft 2j2 1AM /FM Re- Inspection required: Yes No �_/ When corrections have been made, call for re- inspection at 303 - 234 - 5933 Date: L q_rfl Inspector. DO NOT REMOVE THIS NOTICE City of Wheat Ridge Residential Roofing PERMIT - 091385 PERMIT NO: 091385 ISSUED: 08/17/2009 JOB ADDRESS: 10505 W 34TH AVE EXPIRES: 02/13/2010 DESCRIPTION: Reroof 41 sqs ***.CONTACTS owner 3.03/232-3109.`. Al Rooney sub 720./381-0453 Lee Perkins `09-0207. Perkins Construction * * PARCEL INFO 'ZONE CODE: UA USE: UA $ SUBDIVISION: 0647. BLOCK/LOT#: 0./ BEE SUMMARY -ESTIMATED PROJECT VALUATION: 10,020.00. z FEES Permit Fee253.90.. Total Valuation .00 € "))kaF-~I Use Tax 180 .36 TOTAL 434.26. Conditions: ':.6 nail installation & mid-roof inspection required. Board sheathing spaced more ' than a 1/2 of an inch apart requires plywood overlay on entire :roof. Ice and '.water shield required from.eave edge to 2' inside exterior walls. g Subject to field inspections.. I.. hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the city of wheat Ridge or covenants, easements or restrictions of record; that all E~ - measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with the Wheat Ridge. Building Code (I.B.C) and all other r applicable Wheat Ridge Ordinances, for. work under this permit. Plans subject to field inspection.. v, Signature of contractor/owner ` date 1 ..This permit was issued in accordance. with the. provisions set forth in your application and is subject to the laws of the - State of Colorado and to the Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable ordinances of. the city. 2. This permit shall expire 180 days from the issue date. Requests for an extension must be received. prior to expiration f% date.` An extension may-be. granted at the discretion of the Building Official. - 3. If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be made in the original plans and. specifications and any suspension or abandonment has not ..exceeded one (1) year. If changes have been or if suspension or abandonment exceeds one (1). year, full fees shall be paid for a new permit. - 4. No work of any manner shall be done that will change the natural flow of water causing a drainage problem. 5.: Contractor shall notify the Building inspector twenty-four (24) hours in advance. for all inspections and shall receive written approval on inspection card before proceeding with successive phases of the.: job. 6. The issuance of a permit or the approval of drawings and specifications shall not. be construed. to be a. permit for, nor an approval of a iolation of the provisions of the building codes or any other ordinance, law, Is or regulation. All plan vye~ subject to field inspections. 3 lJ1p TQ. N ` Signature o hie Building Official .:date INSPECTION REQUEST 'LINE: (303)234-5933 BUILDING OFFICE: (303)235-2855 `REQUESTS MUST BE MADE BY 3PM ANY ;BUSINESS DAY FOR INSPECTION. THE FOLLOWING BUSINESS DAY. 7. E,. - a City of Wheat Ridge Building Division 7500 W. 29th Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-235-2857 Inspection Line: 303-234-5933 Date: U I I -I'I v-1 Plan \ Permit Q q Building Permit Application Property Address: U S t, 57 .w -3 y71 *(lL- to/-ell1 14146,c- Property owner (please print): L /2p0,cJC- Y Phone: ~O 3 2 3 2, 3/0Q Mailing Address: (if different than property address) Address: City, State, Zip: Contractor: P46-1- Kt'US 6dyS~i~u0,4/1 /NG. Contractor License ® 1 O 2 p `7 Phone: 7 Z-o - S 1- 0 Y 5' 3 Sub Contractors: Electrical City License Plumbing City License Mechanical City License Company: Company Company: Exp. Date: Exp. Date: Exp. Date: Approval: Approval: Approval: ADD IC Construction Value: $ /d, d 2d Use space (description): Description of work: (as calculated per the Building Valuation Data sheet) O Y T f M,64e~ rti~ Plan Review (due at time of submittal): $ Sq. Ft./L.Ft added: Squares `-7 / BTU's Gallons Amps OWNERICONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that 1 assume full responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for work under this permit. Plans subject to field inspection. CIRLCE ONE:: (OWNER) CONTRACTOR or PERSONAL REPRESENTATIVE of (OWNER) (CONTRATOR) PRINT NAME: dl1 - T ~K I IUSIGNATURE: - Z->"` Date: rS-17'0C'(