HomeMy WebLinkAbout9021 W. 46th PlaceCity
of Wheat Ridge
Res.
Miscellaneous PERMIT - 0
93350
'PERMIT NO: 093350
ISSUED:
10/14/2009
JOB ADDRESS: 9021 W 46th P1
EXPIRES:
04/12/2010
.-)".DESCRIPTION: Temporary Dumpster Permit Gooduntil
10/28/2009
CONTACTS
I?i. Owner 303/422-8474
Sharon Bittick
* * PARCEL INFO
ZONE CODE: UA
USE;
UA
SUBDIVISION: 0222
BLOCK/LOT#:
0/
FEE SUMMARY ESTIMATED PROJECT VALUATION: .00
FEES
Demolition Fee 35.00
TOTAL 35.00
Conditions:
Good for 15 days only unless extended.
I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable
ordinances, rules or regulations of the City of wheat Ridge or covenants, easements or restrictions of record; that all
measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this
applicat'o and that I assume full responsibility for compliance with the Wheat Ridge Building Cade (I.B. C) and all other
apple Z.t R de<Brdinagc , for work under this permit. Plans subject to field inspection.
Signature of con ractor/owner date
1.. This permit was issued in accordance with the provisions set forth in your application and is subject to the laws of the
State of Colorado and to the Zoning Regulations and Building Codes of wheat Ridge, Colorado or any other applicable
ordinances of the City.
2. This permit shall expire 180 days from the issue date. Requests for an extension must be received prior to expiration
date. An extension may be granted at the discretion of the Building Official.
't 3. If this permit expires, a new permit may be acquired. for a fee of one-half the amount normally required, provided no
changes have been or will be made in the original plans and specifications and any suspension or abandonment has not
exceeded one (1) year. If changes have been or if, suspension or abandonment exceeds one (1) year, full fees shall
be paid for a new permit.
4. No work of any manner shall be'. done that will change the natural flow of water causinga drainage problem.
%5. Contractor shall notify the Building Inspector twenty-four(24) hours in advance for all inspections and shall receive
written approval on inspection card before proceeding with 'successive phases of the job.
6. The issuance of a permit or the approval. of drawings and specifications shall not be construed to. be a permit for, nor
an approval of, any violation of the provisions of the building codes or any other ordinance, law, rule or regulation.
All plan revP is subject to field inspections.
ief Building Official date
CTION. REQUEST LINE: (303)234-5933 BUILDING OFFICE: (303)235-2855
STS. MUST BE MADE BY. 3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY
City of
Wheat
COMMUNITYDEVELOPME3T1 e Temporary Placement Permit
-
for Construction Dumpsters and Storage Containers
Community Development Department
City of Wheat Ridge
7500 W. 29th Avenue
Wheat Ridge, CO 80033 (303) 235-2855
Date: ,//2-ZZ- 12 : Phone:
Property
Address of Dumpster/Container:
Cu. Yds.
,Dumpster/Container Company: c J $O ~~trr)~r~r>~
Dumpster/Container Company Address:
Dumpster/Container Company Phone Number:
Will dumpster/container be located on private property? Yes No ❑
Will dumpster/container be located on street? Yes ❑ No ❑
(if yes, a separate right-of-way permit is required.)
* THIS PERMIT EXPIRES FIFTEEN (15) DAYS FROM DATE OF APPROVAL.
APPROVAL DATE:
Permits are approved subject to the following conditions:
1. Temporary dumpsters/containers may be allowed in all zone districts and must be located on private property.
2. If impractical to locate on private property, a right-of-way permit may be obtained from the Public Works Department
pursuant to Article III of Chapter 21 of the Wheat Ridge Code of Laws. Contact 303-235-2861.
3. Temporary dumpsters/containers shall not be located so as to create sight, traffic, or safety obstructions.
4. Dumpsters/containers shall not block sidewalks or impede pedestrian traffic.
5. The area surrounding the dumpster/container shall be kept clean and free of debris.
6. Permittee is required to keep this permit displayed so as to be visible from the street.
7. Permittee assumes all liability and holds the City harmless against all claims, damages, suites, penalties, fines
and liability for injury or death to persons or loss or damage to property related to the placement of a
dumpster/container in the City right-of-way.
8. The repair of any damage to pavement, curb, gutter, landscaping resulting from the placement, use or removal of the
dumpster/container shall be the responsibility of the applicant and shall be performed to the satisfaction of the City.
Fee: 35.(
Signature of
Approved By:
Planning Division Building Division Public Works