HomeMy WebLinkAbout11762 W. 34th AvenueINSPECTION RECORD
INSPECTION ONLINE FORM: http://www.ci.wheatridge.co.us/inspection
INSPECTION REQUEST LINE: (303) 234-5933
Cancellations must be submitted via the online form before 8 a.m. the day of the inspection
Occupancy/Type
Inspections will not be performed unless this card is posted on the project site.
**Request an inspection before 11:59 p.m. (midnight) to receive an inspection the following business day.**
Inspector Must Sign ALL Spaces pertinent to this project
Foundation Inspections Date Inspector Comments
Initials
Pier
Concrete Encased Ground (CEG)
Foundation / P.E. Letter
Do Not Pour Concrete Prior To Approval Of The Above Inspections
Underground/Slab Inspections Date Inspector Comments
Initials
Electrical
Sewer Service
Plumbing
Do Not Cover Underground or Below/In-Slab Work Prior To Approval Of The Above Inspections
Rough Inspections
Date
Inspector
Initials
Comments
Wall Sheathing
Mid -Roof
Lath / Wall Tie
Rough Electric "
Rough Plumbing/Gas Line
Rough Mechanical
Rough Framing
Rough Grading
Insulation
Drywall Screw/ Nail
Final Inspections
Date
Inspector
Initials
Comments
! Landscaping & Parking / Planning Dept.
Inspections from these entities should be requested
one week in advance. For landscaping and parking
inspections call 303-235-2846. For ROW and drainage
inspections call 303-235-2861. For fire inspections
contact the Fire Protection District for your project.
1 ROW & Drainage / Public Works Dept.
Floodplain Inspection (if applicable)
Fire Inspection / Fire Protection Dist.
I Final Electrical
Final Plumbing
Final Mechanical
Roof
W21
)
Final Window/Doors
Final Building
NOTE: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate
of Occupancy is issued. Approval of the Final Building inspection does not constitute authorization of occupancy.
-For low voltage permits — Please be sure that rough inspections are completed from the Fire District and electrical low voltage
by the Building Division.
Occupancy Is Not Permitted Until A Certificate of Occupancy Is Issued
Protect This Card From The Weather
ADDITIONAL TERMS AND CONDITIONS OF CONTRACT
1 Cancellation. Owner may cancel this Proposal and Contract and receive a full refund of any deposit by providing written notice to Elite Construction at 800 E 64th Ave,
Denver, CO 80229 or 14027 Memorial Drive, #360, Houston TX 77079 depending upon the stat in which work is being done. Notice must be received within 72 hours
of execution of the Contract. If applicable, Owner may also cancel this Contract by providing written notice within 72 hours of receipt of notice by its insurance company
that the claim is denied in whole or in part, but only in accordance with C.R.S. section 6-22-104. Written notice may be provided by hand delivery, by FedEx, U.S. Mail,
or facsimile transmission. Thereafter if Owner cancels this Contract prior to commencement of the work, Owner shall pay Elite Construction thirty percent (30%) of the
Contract price or $1,000, whichever is greater, as reasonable and just compensation for the company's services. This Contract shall commence upon the first work
performed by Elite Construction following execution by Owner. If Owner cancels this Contract after commencement of work Owner will pay, in addition to the above
amount, the cost of materials, labor and Elite Construction's associated profit for work completed at the time of such cancellation.
2 Insurance Involvement: This Contract shall commence upon execution by Owner and initial communication with Owner's insurance company, if applicable
a Contract Price. The Contract price will be equal to prevailing wages and material costs as determined by Xactimate and as agreed to by Elite Construction and
the Owner's insurance company, or the price set forth on the front of the Contract, whichever is greater. Owner and Elite Construction agree that the Contract price
shall also include permit costs, upgrades requested by Owner, compliance costs associated with local municipal building codes or safety requirements, and any
additional or unforeseen repairs discovered after commencement of the work. Owner understands that these additional costs will be added to the Contract price
set forth on the front of this Contract.
b Services. Elite Construction agrees to provide the following services pursuant to this Contract: i) communicate directly with Owner's insurance company, if
applicable, and negotiate the scope and amount of Owners insurance claim, including but not limited to permit costs, municipal building codes and safety
requirements applicable to the claim, and the amount of overhead and profit attributable to the claim, ii) locate a licensed contractor to supply materials and labor
to perform the work identified herein, which contractor shall be covered by general liability insurance, and ii) coordinate with the Owner and contractor regarding
scheduling code requirements, measurements, etc.
c Overhead and Profit. Owner and Elite Construction agree that Elite Construction as a licensed General Contractor shall be entitled to compensation in the amount
of 10% of the Contract price for overhead, as well as compensation in the amount of 10% of the Contract price for profit. However, should Owner's insurance
company unreasonably deny Owner's claim or unreasonably delay payment of Owner's claim, Elite Construction shall be entitled to overhead and profit in the
amount of 20% of the Contract price for overhead and 20% of the Contract price for profit as reasonable and just compensation for the extra time and services
required to perform the work stated herein. Should the work performed by Elite Construction not be covered by Owner's insurance claim, and should Owner
unreasonably interfere with Elite Construction's work or delay payment, Elite Construction shall be entitled to overhead and profit in the amount of 20% of the
Contract price for overhead and 20% of the Contract price for profit as reasonable and just compensation for the extra time and services required to perform the
work stated herein. As set forth herein, any denial or delay longer than thirty (30) days shall be deemed unreasonable.
dOwner shall request that Elite Construction be made an additional payee on all checks issued to Owner from the insurance company. If the work performed
by Elite Construction herein is to be paid by Owner's insurance company, Owner shall not be obligated to make payment until such time that the insurance company
unreasonably refuses to pay the claim or unreasonably delays payment of the claim. Should Owner receive payment from the insurance company and thereafter
fail to pay amounts owed under this Contract, Elite Construction shall be entitled to recover treble damages from Owner as allowed by C.R.S. § 18-4405, as well
as its costs and attorneys' fees.
3 Owner's Responsibilities. Owner shall make all payments to Elite Construction required by this Contract. Owner shall obtain all consents and approvals required by
any architectural review committee, homeowner's association or similar entity regarding repairs and/or improvements to be constructed on the Property. Owner agrees to
promptly specify any objections to any work performed pursuant to this Contract and its failure to do so shall constitute an acceptance of the work. Owner shall remove
or protect all of Owner's existing items of property, including, without limitation, shrubs and flowers, at the Property that could be affected by the work contemplated herein.
Neither Elite Construction nor its contractor shall be responsible for previous damaged driveways, sidewalks, walks, lawns, trees, shrubs, flower beds and items of
personal property. Contractor will do their best to protect all work related areas. Owner further agrees to be available in person or by telephone between the hours of 7
a.m. and 6 p.m. in order to discuss the status of the project with Elite Construction. Owner agrees to direction of payment to include Elite Construction as payee on all
progress & final payment issued by Insurance Carrier. Any failure by issuer will result in legal recourse.
4 Scheduling. Owner agrees to cooperate with Elite Construction in the scheduling and performance of this Contract. Owner agrees to adhere to and follow Elite
Construction's reasonable directions and requests regarding scheduling. Elite Construction and its contractor shall not be responsible for any delays caused by
circumstances and events outside of their control, including but not limited to changes to the scope of work requested by Owner, other acts or omissions by Owner,
prohibitive weather, fire or casualty loss, non-availability of labor or materials, delays caused by a governmental entity's failure to issue permits, accidents, and other
events beyond the Builder's reasonable control.
5 Indemnity. Owner shall indemnify Elite Construction and its contractor from all claims, damages, losses, suits, judgments and expenses, including reasonable legal
fees and costs, caused by Owners failure to properly maintain safe access to the Property, as well as Owners failure to insure against fire or other casualty causing
loss or damage prior to final payment.
6 Payment. Owner shall make a deductible payment at the time of contract signing if statement of loss has already been generated by insurance adjuster. Otherwise
deductible will be collected at the time of insurance adjuster meeting. In the event that insurance makes checks payable to the owner rather than Elite Construction: ACV
payment at the time of materials order, RCV at the time completion, and any supplementing payments that occur as part of the insurance negotiation process.
7. Collection and Interest. Owner shall, if applicable, use its best efforts to obtain prompt payment from its insurance company and/or Mortgage Company. No additional
work shall commence until Elite Construction receives payment of the Actual Cash Value or 50% of the cost of the associated trades. In the event Elite Construction does
not receive payment within twenty-one (21) days of its invoice, Owner agrees that Elite Construction shall be entitled to collect interest at the rate of 1.5% per month on
all amounts due and owing. Owner shall be liable for payment even if the delay or failure to pay is caused by the acts, or failure to act, of the insurance company or
Mortgage Company. Owner acknowledges and agrees that such payments are due even in the absence of government inspections. Owner understands that mechanics'
liens may be placed on the Property until the Contract price is paid in full. As such, Owner waives the benefit of any applicable homestead exemption pursuant to C.R.S.
§ 38-41-101 et seq. Owner agrees to reimburse Elite Construction for all reasonable costs incurred in enforcing the terns of this Contract, regardless of whether suit is
commenced, including but not limited to reasonable attorneys' fees, cost of suit, cost of investigation, depositions, and discovery, and expert witness fees.
8 Termination. Elite Construction shall be entitled to terminate this Contract in the event that Owner fails to perform any of its obligations set forth herein. Elite Construction
will be entitled to payment in the amount of 30% of the Contract price as reasonable and just compensation for the company's services. Elite Construction will be entitled
to additional payment in the amount of its cost for materials and labor, and for its associated overhead and profit for work completed at the time of such termination. Elite
Construction shall be entitled to retain any amounts previously paid by Owner, and shall be entitled to recover payment from Owner as set forth above.
9 Warranty. Elite Construction will ensure that the work set forth herein is performed by a professional contractor. The contractor warrants its work in accordance with its
standard policies and warranties, a copy of which will be provided to Owner, subject to any conditions or limitations communicated by the Contractor. Material will be
warranted as set forth in the manufacturer's standard warranties. Owner acknowledges and agrees that no representations or warranties, express or implied, are made
by Elite Construction concerning the nature, condition or construction of the improvements or the suitability of the property for the construction of the improvements
described herein: all such warranties are hereby disclaimed by Elite Construction and waived by owner to the fullest extent allowed by law, including but not limited to
any and all express or implied warranties of merchantability, habitability, suitability, condition, fitness for a particular purpose, or workmanship, UNLESS NOTED ON
THE FRONT OF THIS CONTRACT. IE: WORKMANSHIP WARRANTY.
10. Limitation of Liability. THE SERVICES AND MATERIALS PROVIDED BY Elite Construction OR CAUSED TO BE PROVIDED BY Elite Construction ARE
PROVIDED "AS IS" WITHOUT ANY WARRANTY OF ANY KIND, EXCEPT FOR SUCH WARRANTIES AS ARE SPECIFICALLY PROVIDED BY THE CONTRACTOR
AND MANUFACTURER. THE CONTRACTOR AND MATERIAL SUPPLIERS PROVIDING SERVICES HEREUNDER ARE INDEPENDENT CONTRACTORS AND
NOT AGENTS OR EMPLOYEES OF Elite Construction. AS SUCH, Elite Construction IS NOT LIABLE FOR THEIR ACTS, OMISSIONS, REPRESENTATIONS,
WARRANTIES, BREACHES, OR NEGLIGENCE, OR FOR ANY PERSONAL INJURIES, DEATH, PROPERTY DAMAGE, OR OTHER DAMAGE OR EXPENSE
RESULTING THEREFROM. IN NO EVENT SHALL Elite Construction BE LIABLE FOR ANY DIRECT, INDIRECT, PUNITIVE, INCIDENTAL, SPECIAL OR
CONSEQUENTIAL DAMAGES ARISING OUT OF, OR IN ANY WAY CONNECTED WITH, THE REPRESENTATIONS, SERVICES, OR MATERIALS PROVIDED BY
CONTRACTOR OR MANUFACTURER, WHETHER BASED UPON A THEORY OF NEGLIGENCE, CONTRACT, TORT, STRICT LIABILITY, OR OTHERWISE. If
despite the limitation above, Elite Construction is found liable for such loss or damages, then the liability of Elite Construction or its affiliates will not exceed, in the
aggregate, the amounts paid to Elite Construction. This limitation of liability reflects the parties' agreement as to the allocation of risk and injury to the benefit Elite
Construction.
11. Default. Owner agrees that in the event it shall be in default in the payment of the purchase price when due, or if bankruptcy, receivership, assignment for the benefit of
creditors or other insolvency proceedings are commenced by or against it, Owner shall be immediately indebted to, and hereby agrees to pay, Elite Construction the
entire balance due hereunder. Further, Elite Construction may, in its sole discretion, terminate this Contract or insist on additional terms to provide it with reasonable
assurance that Customer is able to timely perform its obligations under this Contract.
12 No Waiver. Any failure by Elite Construction to insist upon Owner's strict performance of the terms of this Contract shall not be construed as a waiver of any of
Elite Construction's rights under this Contract.
13. Partial Invalidity. The un -enforceability or invalidity of any term of this Contract shall not impair or modify any other term of this Contract.
14. Miscellaneous. Colorado law shall govern the interpretation of this Contract. Owner acknowledges that he/she has the authority to execute this Contract and that this
Contract represents the parties' entire agreement. Owner further acknowledges that he/she has not relied upon any representations, promises, or assurances by Elite
Construction other than those set forth herein. Owner agrees to release to Elite Construction all insurance statements of loss so that Elite Construction can determine
the correct project scope/assignments. Owner also agrees to accept representation from a public or independent adjuster if deemed necessary by Elite Construction.
Any pricing discrepancies with the insurance company shall be subject to the Colorado Division of Insurance guidelines for appraisal and/or the appraisal process set
forth in Owner's insurance policy, as well as any arbitration clause regarding the differences in scopes of work, and can by facilitated by Elite Construction pursuant to
this Contract. Owner agrees that Elite Constructigyspe�I participate on its behalf in any appraisal and/or arbitration process.
R. LJ . 07/14/2017
Owner Initials Date
City of Wheat Ridge
Residential Roofing PERMIT - 201705675
PERMIT NO: 201705675 ISSUED: 08/08/2017
JOB ADDRESS: 11762 W 34th AVE EXPIRES: 08/08/2018
JOB DESCRIPTION: Residential Re -roof to install GAF Timberline HD asphalt shingles - 37 sq
*** CONTACTS ***
OWNER (303)667-3100 DIEGEL KURT C
SUB (720)446-9633 Steven Grillo 140107 Elite Construction LLC
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 9,509.00
FEES PAID
Total Valuation 0.00
Use Tax 199.69
Permit Fee 204.30
** TOTAL ** 403.99
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name)
roof covering" is required to be on site at the time of final inspection.
Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd
party inspection report will be collected at final roof inspection performed by City of
Wheat Ridge. If report is not available the final inspection will not be completed.
ti City of Wheat Ridge
Residential Roofing PERMIT - 201705675
PERMIT NO: 201705675 ISSUED: 08/08/2017
JOB ADDRESS: 11762 W 34th AVE EXPIRES: 08/08/2018
JOB DESCRIPTION: Residential Re -roof to install GAF Timberline HD asphalt shingles - 37 sq
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this pe!��
work to be
perforiivo� be performed is disclosed in this document and/or its' accom anyi g approved plans and specifications.
Signature jdf OWNER "or CONTRACTOR (Circle one) Date
I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and maybe subject to a fee equal to one-half of the originalpermit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applic e�o�r any or`ddiin�a�nc`e or regulation of this jurisdiction. Approval of work is subject to f any
inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Dan Schultz
ZeI%OS6�)-
From: no-reply@ci.wheatridge.co.us
Sent: Tuesday, August 1, 2017 8:32 AM
To: CommDev Permits
Subject: Online Form Submittal: Residential Roofing Permit Application
Categories: Gina
Residential Roofing Permit Application
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
your contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a Yes
residential roof?
How many dwelling units Single Family Home
are on the property?
PROPERTY INFORMATION
Property Address
Property Owner Name
Property Owner Phone
Number
Property Owner Email
Address
11762 West 34th aveT_)L
Kurt Diegel
303-667-3100
Field not completed.
Do you have a signed
Yes
contract to reroof this
property?
It will need to be
provided at the time of
permit pick-up.
Attached Copy of
Diesel contract.pdf
Contract
CONTRACTOR INFORMATION
Contractor Business
Marrick Industries Dba Elite Constuction
Name
Contractor's License
140107
Number (for the City of
;
Wheat Ridge)
I �-
Contractor Phone
720-446-9633
Number
Contractor Email Address
office@elitesc.net
Retype Contractor Email
office@elitesc.net
Address
DESCRIPTION OF WORK
Are you re-decking the
No
roof?
Description of Roofing
GAF Timberline HD
Material
Select Type of Material:
Asphalt
If "Other" is selected
Field not completed.
above, describe here:
How many squares of the
37
material selected above?
Does any portion of the
No
property include a flat
roof?
If yes, how many squares
Field not completed.
on the flat roof?
/
TOTAL SQUARES
37 /
(pitched + flat) of all
i
roofing material for this
project
Provide additional detail 4/12
here on the description of
work. (Is this for a house
or garage? What is the
roof pitch? Etc)
Project Value (contract53� 2. p
value or cost of ALL
materials and labor)
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this Yes
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
Name of Applicant Kathy Dematteo
Email not displaying correctly? View it in your browser.
3
Elite Construction, Proposal & Contract e
800 E. 64th Ave Suite #7, Denver CO 80229
14027 Memorial Drive, #360, Houston TX 77079 sss.
Office: 720-446-9633 1 Fax: 720-336-3996
Elitesc.Net I Office Elitesc.Net
Elite Construction, a Colorado based company, agrees to perform the work listed herein at the referenced property upon
owner's execution of this proposal and contract and subject to receipt of payment as described below.
Owner Name Kurt Diegel Today's Dat@7/14/2017 Date of Damage 5/8/17
Property Location 11762 West 34th Avenue, Wheat Ridge, CO 80 i$ance Co. Travelers Insurance Email
Address if Different Policy # Claim# SNY5658001 H
Owner Email KCDIEGEL@GMAIL.COM Agent Name Agent Phone # 3158575833
Owner Cell Phone # (303) 667-3100 Adjuster Name Adj. Phone/Ext
Mortgage (y/n) Mortgage CO Loan #
Elite Representative Jim Elliott Rep. Phone 720-446-9633 Rep. Email Jim@elitesc.net
SCOPE OF WORK
Existing Roof Type: shingle Roof Pitch: 4/12
Type: GAF Waste: °
Repair or Replace with: GAF Tear Off Layers: 1
Style: Timber HD Color:
Mfrs. Warranty 30 yrs Elite Warranty: 3 Yrs.
INSTALL DETAILS
❑ New Synthetic Underlayment, Starter, Ridge, Ice and Water
❑ Edge Metal / Color
❑ Vents / Type / Color / #.
❑ Stack Cap / Type / Color / #.
❑ Pipe Jacks / Size / #_
❑ Step Flash / LF
❑ Chimney Flashing/ LF_
❑ Gutter/ Style / Color/ LF.
Est. Project Start approx 2 weeks Completion 3 days roof
❑ Estimated Total $ 18,000 + supplements
Payment Schedule
Deductible.........................................At Adjuster Meeting
ACV (Actual Cash Value).................Material Purchase
RCV (Recoverable Cash Value)....... Job Completion
SERVICES
❑ Clean up / Haul away trash
❑ Lien Waiver provided
❑ Seal around pipes & vents (as needed)
❑ Safety Checks
❑ Clean up daily & protect landscape
❑ Permit Provided
❑ Clean out gutters (roofing trash)
❑ Insurance Coordination
❑ Roll magnet through yard
❑ Inspect roof upon completion
Final price agreed upon with insurance carrier to
prevailing market cost via Xactimate. Owners out
of pocket expense will equal the policy deductible
amount plus any requested upgrades and building
code requirements not agreed to by the insurance
company.
Insurance Claim Agreement: This Proposal and Contract is contingent upon Owner's insurance company agreeing to pay for the work described herein
and will be void if Owner's claim is denied by the insurance company. Owner hereby authorizes Elite Construction to be its representative in the insurance
claims, approval and supplementing process, and to communicate directly with the insurance company regarding the same. Owner authorizes Elite Construction to
perform work as specified herein and/or in accordance with insurance loss sheet.
Owner has the right to rescind the contract pursuant to C.R.S section 6-22-104. If Owner plans to use the proceeds of a property and casualty insurance policy to pay
for roofing work, Elite Construction cannot pay, waive, rebate or promise to pay, waive or rebate all or part of any insurance deductible. Elite Construction is municipality
licensed and insured by Builders Insurance Group #1117499519
Owner agrees to direction of payment to include Elite Construction as payee on all progress & final payment issued by Insurance carrier.
Property Owner Signature: e -Signed by Kurt Diegel
07/17/2017
I HAVE READ AND AGREED TO THE TERMS AND CONDITIONS OF CONTRACT ON THE REVERSE SIDE Initial here K. D.
i CITY OF WHEAT RIDGE
_��9�Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type:
"
Job Address: fl �� % c `/ ` . j ✓ t
Permit Number:'��d
❑ No one available for inspection: Time!M/PM
Re -Inspection required: Yesr No,
L._.
When corrections have been made, call for re -inspection at 303-234-5933
Date: ('r Inspector:
l
DO NOT REMOVE THIS NOTICE
City of Wheat Ridge
Residential Roofing PERMIT - 201705675
PERMIT NO: 201705675 ISSUED: 08/08/2017
JOB ADDRESS: 11762 W 34th AVE EXPIRES: 08/08/2018
JOB DESCRIPTION: Residential Re -roof to install GAF Timberline HD asphalt shingles - 37 sq
*** CONTACTS ***
OWNER (303)667-3100 DIEGEL KURT C
SUB (720)446-9633 Steven Grillo 140107 Elite Construction LLC
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 2403 / APPLEWOOD VILLAGES, PROSPECT V BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 9,509.00
FEES PAID
Total Valuation 0.00
Use Tax 199.69
Permit Fee 204.30
** TOTAL ** 403.99
*** COMMENTS ***
*** CONDITIONS ***
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name)
roof covering" is required to be on site at the time of final inspection.
Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd
party inspection report will be collected at final roof inspection performed by City of
Wheat Ridge. If report is not available the final inspection will not be completed.
ti City of Wheat Ridge
Residential Roofing PERMIT - 201705675
PERMIT NO: 201705675 ISSUED: 08/08/2017
JOB ADDRESS: 11762 W 34th AVE EXPIRES: 08/08/2018
JOB DESCRIPTION: Residential Re -roof to install GAF Timberline HD asphalt shingles - 37 sq
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this pe!��
work to be
perforiivo� be performed is disclosed in this document and/or its' accom anyi g approved plans and specifications.
Signature jdf OWNER "or CONTRACTOR (Circle one) Date
I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and maybe subject to a fee equal to one-half of the originalpermit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applic e�o�r any or`ddiin�a�nc`e or regulation of this jurisdiction. Approval of work is subject to f any
inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Dan Schultz
ZeI%OS6�)-
From: no-reply@ci.wheatridge.co.us
Sent: Tuesday, August 1, 2017 8:32 AM
To: CommDev Permits
Subject: Online Form Submittal: Residential Roofing Permit Application
Categories: Gina
Residential Roofing Permit Application
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
your contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a Yes
residential roof?
How many dwelling units Single Family Home
are on the property?
PROPERTY INFORMATION
Property Address
Property Owner Name
Property Owner Phone
Number
Property Owner Email
Address
11762 West 34th aveT_)L
Kurt Diegel
303-667-3100
Field not completed.
Do you have a signed
Yes
contract to reroof this
property?
It will need to be
provided at the time of
permit pick-up.
Attached Copy of
Diesel contract.pdf
Contract
CONTRACTOR INFORMATION
Contractor Business
Marrick Industries Dba Elite Constuction
Name
Contractor's License
140107
Number (for the City of
;
Wheat Ridge)
I �-
Contractor Phone
720-446-9633
Number
Contractor Email Address
office@elitesc.net
Retype Contractor Email
office@elitesc.net
Address
DESCRIPTION OF WORK
Are you re-decking the
No
roof?
Description of Roofing
GAF Timberline HD
Material
Select Type of Material:
Asphalt
If "Other" is selected
Field not completed.
above, describe here:
How many squares of the
37
material selected above?
Does any portion of the
No
property include a flat
roof?
If yes, how many squares
Field not completed.
on the flat roof?
/
TOTAL SQUARES
37 /
(pitched + flat) of all
i
roofing material for this
project
Provide additional detail 4/12
here on the description of
work. (Is this for a house
or garage? What is the
roof pitch? Etc)
Project Value (contract53� 2. p
value or cost of ALL
materials and labor)
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this Yes
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
Name of Applicant Kathy Dematteo
Email not displaying correctly? View it in your browser.
3
Elite Construction, Proposal & Contract e
800 E. 64th Ave Suite #7, Denver CO 80229
14027 Memorial Drive, #360, Houston TX 77079 sss.
Office: 720-446-9633 1 Fax: 720-336-3996
Elitesc.Net I Office Elitesc.Net
Elite Construction, a Colorado based company, agrees to perform the work listed herein at the referenced property upon
owner's execution of this proposal and contract and subject to receipt of payment as described below.
Owner Name Kurt Diegel Today's Dat@7/14/2017 Date of Damage 5/8/17
Property Location 11762 West 34th Avenue, Wheat Ridge, CO 80 i$ance Co. Travelers Insurance Email
Address if Different Policy # Claim# SNY5658001 H
Owner Email KCDIEGEL@GMAIL.COM Agent Name Agent Phone # 3158575833
Owner Cell Phone # (303) 667-3100 Adjuster Name Adj. Phone/Ext
Mortgage (y/n) Mortgage CO Loan #
Elite Representative Jim Elliott Rep. Phone 720-446-9633 Rep. Email Jim@elitesc.net
SCOPE OF WORK
Existing Roof Type: shingle Roof Pitch: 4/12
Type: GAF Waste: °
Repair or Replace with: GAF Tear Off Layers: 1
Style: Timber HD Color:
Mfrs. Warranty 30 yrs Elite Warranty: 3 Yrs.
INSTALL DETAILS
❑ New Synthetic Underlayment, Starter, Ridge, Ice and Water
❑ Edge Metal / Color
❑ Vents / Type / Color / #.
❑ Stack Cap / Type / Color / #.
❑ Pipe Jacks / Size / #_
❑ Step Flash / LF
❑ Chimney Flashing/ LF_
❑ Gutter/ Style / Color/ LF.
Est. Project Start approx 2 weeks Completion 3 days roof
❑ Estimated Total $ 18,000 + supplements
Payment Schedule
Deductible.........................................At Adjuster Meeting
ACV (Actual Cash Value).................Material Purchase
RCV (Recoverable Cash Value)....... Job Completion
SERVICES
❑ Clean up / Haul away trash
❑ Lien Waiver provided
❑ Seal around pipes & vents (as needed)
❑ Safety Checks
❑ Clean up daily & protect landscape
❑ Permit Provided
❑ Clean out gutters (roofing trash)
❑ Insurance Coordination
❑ Roll magnet through yard
❑ Inspect roof upon completion
Final price agreed upon with insurance carrier to
prevailing market cost via Xactimate. Owners out
of pocket expense will equal the policy deductible
amount plus any requested upgrades and building
code requirements not agreed to by the insurance
company.
Insurance Claim Agreement: This Proposal and Contract is contingent upon Owner's insurance company agreeing to pay for the work described herein
and will be void if Owner's claim is denied by the insurance company. Owner hereby authorizes Elite Construction to be its representative in the insurance
claims, approval and supplementing process, and to communicate directly with the insurance company regarding the same. Owner authorizes Elite Construction to
perform work as specified herein and/or in accordance with insurance loss sheet.
Owner has the right to rescind the contract pursuant to C.R.S section 6-22-104. If Owner plans to use the proceeds of a property and casualty insurance policy to pay
for roofing work, Elite Construction cannot pay, waive, rebate or promise to pay, waive or rebate all or part of any insurance deductible. Elite Construction is municipality
licensed and insured by Builders Insurance Group #1117499519
Owner agrees to direction of payment to include Elite Construction as payee on all progress & final payment issued by Insurance carrier.
Property Owner Signature: e -Signed by Kurt Diegel
07/17/2017
I HAVE READ AND AGREED TO THE TERMS AND CONDITIONS OF CONTRACT ON THE REVERSE SIDE Initial here K. D.
ADDITIONAL TERMS AND CONDITIONS OF CONTRACT
1 Cancellation. Owner may cancel this Proposal and Contract and receive a full refund of any deposit by providing written notice to Elite Construction at 800 E 64th Ave,
Denver, CO 80229 or 14027 Memorial Drive, #360, Houston TX 77079 depending upon the stat in which work is being done. Notice must be received within 72 hours
of execution of the Contract. If applicable, Owner may also cancel this Contract by providing written notice within 72 hours of receipt of notice by its insurance company
that the claim is denied in whole or in part, but only in accordance with C.R.S. section 6-22-104. Written notice may be provided by hand delivery, by FedEx, U.S. Mail,
or facsimile transmission. Thereafter if Owner cancels this Contract prior to commencement of the work, Owner shall pay Elite Construction thirty percent (30%) of the
Contract price or $1,000, whichever is greater, as reasonable and just compensation for the company's services. This Contract shall commence upon the first work
performed by Elite Construction following execution by Owner. If Owner cancels this Contract after commencement of work Owner will pay, in addition to the above
amount, the cost of materials, labor and Elite Construction's associated profit for work completed at the time of such cancellation.
2 Insurance Involvement: This Contract shall commence upon execution by Owner and initial communication with Owner's insurance company, if applicable
a Contract Price. The Contract price will be equal to prevailing wages and material costs as determined by Xactimate and as agreed to by Elite Construction and
the Owner's insurance company, or the price set forth on the front of the Contract, whichever is greater. Owner and Elite Construction agree that the Contract price
shall also include permit costs, upgrades requested by Owner, compliance costs associated with local municipal building codes or safety requirements, and any
additional or unforeseen repairs discovered after commencement of the work. Owner understands that these additional costs will be added to the Contract price
set forth on the front of this Contract.
b Services. Elite Construction agrees to provide the following services pursuant to this Contract: i) communicate directly with Owner's insurance company, if
applicable, and negotiate the scope and amount of Owners insurance claim, including but not limited to permit costs, municipal building codes and safety
requirements applicable to the claim, and the amount of overhead and profit attributable to the claim, ii) locate a licensed contractor to supply materials and labor
to perform the work identified herein, which contractor shall be covered by general liability insurance, and ii) coordinate with the Owner and contractor regarding
scheduling code requirements, measurements, etc.
c Overhead and Profit. Owner and Elite Construction agree that Elite Construction as a licensed General Contractor shall be entitled to compensation in the amount
of 10% of the Contract price for overhead, as well as compensation in the amount of 10% of the Contract price for profit. However, should Owner's insurance
company unreasonably deny Owner's claim or unreasonably delay payment of Owner's claim, Elite Construction shall be entitled to overhead and profit in the
amount of 20% of the Contract price for overhead and 20% of the Contract price for profit as reasonable and just compensation for the extra time and services
required to perform the work stated herein. Should the work performed by Elite Construction not be covered by Owner's insurance claim, and should Owner
unreasonably interfere with Elite Construction's work or delay payment, Elite Construction shall be entitled to overhead and profit in the amount of 20% of the
Contract price for overhead and 20% of the Contract price for profit as reasonable and just compensation for the extra time and services required to perform the
work stated herein. As set forth herein, any denial or delay longer than thirty (30) days shall be deemed unreasonable.
dOwner shall request that Elite Construction be made an additional payee on all checks issued to Owner from the insurance company. If the work performed
by Elite Construction herein is to be paid by Owner's insurance company, Owner shall not be obligated to make payment until such time that the insurance company
unreasonably refuses to pay the claim or unreasonably delays payment of the claim. Should Owner receive payment from the insurance company and thereafter
fail to pay amounts owed under this Contract, Elite Construction shall be entitled to recover treble damages from Owner as allowed by C.R.S. § 18-4405, as well
as its costs and attorneys' fees.
3 Owner's Responsibilities. Owner shall make all payments to Elite Construction required by this Contract. Owner shall obtain all consents and approvals required by
any architectural review committee, homeowner's association or similar entity regarding repairs and/or improvements to be constructed on the Property. Owner agrees to
promptly specify any objections to any work performed pursuant to this Contract and its failure to do so shall constitute an acceptance of the work. Owner shall remove
or protect all of Owner's existing items of property, including, without limitation, shrubs and flowers, at the Property that could be affected by the work contemplated herein.
Neither Elite Construction nor its contractor shall be responsible for previous damaged driveways, sidewalks, walks, lawns, trees, shrubs, flower beds and items of
personal property. Contractor will do their best to protect all work related areas. Owner further agrees to be available in person or by telephone between the hours of 7
a.m. and 6 p.m. in order to discuss the status of the project with Elite Construction. Owner agrees to direction of payment to include Elite Construction as payee on all
progress & final payment issued by Insurance Carrier. Any failure by issuer will result in legal recourse.
4 Scheduling. Owner agrees to cooperate with Elite Construction in the scheduling and performance of this Contract. Owner agrees to adhere to and follow Elite
Construction's reasonable directions and requests regarding scheduling. Elite Construction and its contractor shall not be responsible for any delays caused by
circumstances and events outside of their control, including but not limited to changes to the scope of work requested by Owner, other acts or omissions by Owner,
prohibitive weather, fire or casualty loss, non-availability of labor or materials, delays caused by a governmental entity's failure to issue permits, accidents, and other
events beyond the Builder's reasonable control.
5 Indemnity. Owner shall indemnify Elite Construction and its contractor from all claims, damages, losses, suits, judgments and expenses, including reasonable legal
fees and costs, caused by Owners failure to properly maintain safe access to the Property, as well as Owners failure to insure against fire or other casualty causing
loss or damage prior to final payment.
6 Payment. Owner shall make a deductible payment at the time of contract signing if statement of loss has already been generated by insurance adjuster. Otherwise
deductible will be collected at the time of insurance adjuster meeting. In the event that insurance makes checks payable to the owner rather than Elite Construction: ACV
payment at the time of materials order, RCV at the time completion, and any supplementing payments that occur as part of the insurance negotiation process.
7. Collection and Interest. Owner shall, if applicable, use its best efforts to obtain prompt payment from its insurance company and/or Mortgage Company. No additional
work shall commence until Elite Construction receives payment of the Actual Cash Value or 50% of the cost of the associated trades. In the event Elite Construction does
not receive payment within twenty-one (21) days of its invoice, Owner agrees that Elite Construction shall be entitled to collect interest at the rate of 1.5% per month on
all amounts due and owing. Owner shall be liable for payment even if the delay or failure to pay is caused by the acts, or failure to act, of the insurance company or
Mortgage Company. Owner acknowledges and agrees that such payments are due even in the absence of government inspections. Owner understands that mechanics'
liens may be placed on the Property until the Contract price is paid in full. As such, Owner waives the benefit of any applicable homestead exemption pursuant to C.R.S.
§ 38-41-101 et seq. Owner agrees to reimburse Elite Construction for all reasonable costs incurred in enforcing the terns of this Contract, regardless of whether suit is
commenced, including but not limited to reasonable attorneys' fees, cost of suit, cost of investigation, depositions, and discovery, and expert witness fees.
8 Termination. Elite Construction shall be entitled to terminate this Contract in the event that Owner fails to perform any of its obligations set forth herein. Elite Construction
will be entitled to payment in the amount of 30% of the Contract price as reasonable and just compensation for the company's services. Elite Construction will be entitled
to additional payment in the amount of its cost for materials and labor, and for its associated overhead and profit for work completed at the time of such termination. Elite
Construction shall be entitled to retain any amounts previously paid by Owner, and shall be entitled to recover payment from Owner as set forth above.
9 Warranty. Elite Construction will ensure that the work set forth herein is performed by a professional contractor. The contractor warrants its work in accordance with its
standard policies and warranties, a copy of which will be provided to Owner, subject to any conditions or limitations communicated by the Contractor. Material will be
warranted as set forth in the manufacturer's standard warranties. Owner acknowledges and agrees that no representations or warranties, express or implied, are made
by Elite Construction concerning the nature, condition or construction of the improvements or the suitability of the property for the construction of the improvements
described herein: all such warranties are hereby disclaimed by Elite Construction and waived by owner to the fullest extent allowed by law, including but not limited to
any and all express or implied warranties of merchantability, habitability, suitability, condition, fitness for a particular purpose, or workmanship, UNLESS NOTED ON
THE FRONT OF THIS CONTRACT. IE: WORKMANSHIP WARRANTY.
10. Limitation of Liability. THE SERVICES AND MATERIALS PROVIDED BY Elite Construction OR CAUSED TO BE PROVIDED BY Elite Construction ARE
PROVIDED "AS IS" WITHOUT ANY WARRANTY OF ANY KIND, EXCEPT FOR SUCH WARRANTIES AS ARE SPECIFICALLY PROVIDED BY THE CONTRACTOR
AND MANUFACTURER. THE CONTRACTOR AND MATERIAL SUPPLIERS PROVIDING SERVICES HEREUNDER ARE INDEPENDENT CONTRACTORS AND
NOT AGENTS OR EMPLOYEES OF Elite Construction. AS SUCH, Elite Construction IS NOT LIABLE FOR THEIR ACTS, OMISSIONS, REPRESENTATIONS,
WARRANTIES, BREACHES, OR NEGLIGENCE, OR FOR ANY PERSONAL INJURIES, DEATH, PROPERTY DAMAGE, OR OTHER DAMAGE OR EXPENSE
RESULTING THEREFROM. IN NO EVENT SHALL Elite Construction BE LIABLE FOR ANY DIRECT, INDIRECT, PUNITIVE, INCIDENTAL, SPECIAL OR
CONSEQUENTIAL DAMAGES ARISING OUT OF, OR IN ANY WAY CONNECTED WITH, THE REPRESENTATIONS, SERVICES, OR MATERIALS PROVIDED BY
CONTRACTOR OR MANUFACTURER, WHETHER BASED UPON A THEORY OF NEGLIGENCE, CONTRACT, TORT, STRICT LIABILITY, OR OTHERWISE. If
despite the limitation above, Elite Construction is found liable for such loss or damages, then the liability of Elite Construction or its affiliates will not exceed, in the
aggregate, the amounts paid to Elite Construction. This limitation of liability reflects the parties' agreement as to the allocation of risk and injury to the benefit Elite
Construction.
11. Default. Owner agrees that in the event it shall be in default in the payment of the purchase price when due, or if bankruptcy, receivership, assignment for the benefit of
creditors or other insolvency proceedings are commenced by or against it, Owner shall be immediately indebted to, and hereby agrees to pay, Elite Construction the
entire balance due hereunder. Further, Elite Construction may, in its sole discretion, terminate this Contract or insist on additional terms to provide it with reasonable
assurance that Customer is able to timely perform its obligations under this Contract.
12 No Waiver. Any failure by Elite Construction to insist upon Owner's strict performance of the terms of this Contract shall not be construed as a waiver of any of
Elite Construction's rights under this Contract.
13. Partial Invalidity. The un -enforceability or invalidity of any term of this Contract shall not impair or modify any other term of this Contract.
14. Miscellaneous. Colorado law shall govern the interpretation of this Contract. Owner acknowledges that he/she has the authority to execute this Contract and that this
Contract represents the parties' entire agreement. Owner further acknowledges that he/she has not relied upon any representations, promises, or assurances by Elite
Construction other than those set forth herein. Owner agrees to release to Elite Construction all insurance statements of loss so that Elite Construction can determine
the correct project scope/assignments. Owner also agrees to accept representation from a public or independent adjuster if deemed necessary by Elite Construction.
Any pricing discrepancies with the insurance company shall be subject to the Colorado Division of Insurance guidelines for appraisal and/or the appraisal process set
forth in Owner's insurance policy, as well as any arbitration clause regarding the differences in scopes of work, and can by facilitated by Elite Construction pursuant to
this Contract. Owner agrees that Elite Constructigyspe�I participate on its behalf in any appraisal and/or arbitration process.
R. LJ . 07/14/2017
Owner Initials Date
i CITY OF WHEAT RIDGE
-' Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: /`I Z
Job Address: 'dam r ! `) 6 2 w 3,/ + h /-IV(
Permit Number: 2O I ") o 5 , r) ",
e
❑ No one available for inspectionro
:: Time �r� _ NAPM
Re -Inspection required: Yes �
When corrections have been made, call for re -inspection at 303-234-5933
Date: J C Inspector:
DO NOT REMOVE THIS NOTICE
City of Date.,
rWh6atP
j
e-
�,�jg
�COMMUNITY DEVELOPMENT Plan 1permit #
Building & Inspection Services Division Z o ( 4 0 (-: 9 ( --) 2-
7500 W. 29#, Ave., Wheat Ridge, CO 80033 Plan Review Fee:
Office: 303-235-2855 * Fax: 303-237-8929
Inspection Line: 303-234-5933
Email: It i. e. .
Building Permit Application
Plea�411 hl'fi dthe............ . . .....
PI g 1100te,Uar6itI& �6, q orm.,� tip- p
;kvq0s 1 01011 000"1 be'
#k y�O __proqesse,,-,
11762 W 34th Ave
(Pleas 'priot): Kurt Diegel 303-667-3100
•11 IN IM"
Address: 11762 W 34th Ave
qLtL,jute, Zip: Wheat Ridge, CO 80033
Champion Wndows
NN, In, 1 "(1) 0 - RIMIJE
SM2=1
Electdcal:
W.R. QIX Licaffs
-1 #
jzff�
Plumbing:
Citv Licessi-4-
Complete all information on BOTH sides 1f this form
no
NEW COMMERCIAL
NEW RESIDENTIAL STRUCTURE COMMERCIAL RO•
COMMERCIAL ADDITION RESIDENTIAL ROOFING
ADDITIONRESDENTIAL WINDOW REPLACEMENT
C
x
..a'..A ACCESSORY
AIflx s siM (Garage, shed, deck, m.
RESIDENTIAL ACCESSOR
4 EEiM STRUCTURE
MECHANICAL
i x Y Y : REPAIR
♦ xM REPLACEMENT
M :.pk d
PLUMBING SYSTEMIAPPLIANCE REPAIR or REPLACMENT
ELECTRICAL
lx{ SYSTEM/APPLIANCE
•fY4 REPAIR
.. M taY.l. or
REPLACEMENT • A
Sq. Gallons
Amps squares Other
(contract value or the cost of &materials and labor included in the #aft project)
♦ 0
# t i i #ii t• :: i .## t i
IN
Building Division Valuation:
��irvrrr�rrrrr
Kelt Di gel
EM
OitaR +� LE+TrEt3l7 ..,,,�
I
€te T ien R
e rstd co conage Gw ce colohi
ORDER CODE LEGEND.
Bung
2P.0
Twp f t k
l{P H r 1LCA i- Csml P dght Vit
0"
DH- Diu Hung C7riei
V
3 -pe 9
tx VMin Fee Cin9y 4CL4- t- Csmt wt Vent
2P
2 esse6
3P
3 Pe £ uei Lit@
wm 2LC 2 -Lite Cwnt
INSIDE
DUTSIDIE IVISIiIVIT S E DLII DER SITE FULL
Vit x
li
VV X
I3 VY x H YIN
�.
x. I
x
x
► 3
x
,
x701
4
' x
+
x
x
Jt
x
x
x
6
4 x
x
x
x
x
x
10
x
x
x
11
x
x
x
12
x
x
x
13
x
x
x
x
x
x
J14
15
x
x
x
SHOP INSTRUCTIONS
EM
' 4'
CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234 -5933 Inspection line
J (303) 235 -2855 Office ' (303) 235 -2857 Fax
INSPECTION NOTICE
Inspection Type:
Job Address /Permit Number: tfw") 1OW!NI)
r
F
❑ No one available for inspection: Time !'•5 AM f�M
Re- Inspection required: Yes
When corrections have been made, call for re- inspection at 303- 234 -5933.
Date: 0,�f Inspector:
DO NOT REMOVE THIS NOTICE
CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234 -5933 Inspection line
(303) 235 -2855 Office ' (303) 235 -2857 Fax
INSPECTION NOTICE
Inspection Type: �V_n
JobAddress /Permit Number:
Pei,
❑ No one available for inspection: Time in k? AM J M)
Re- Inspection required: des k-
When corrections have been made, call for re- inspection qt 303 - 234 -5933
Date: ° 1~ Inspector:
DO NOT REMOVE THIS NOTICE
" 1 City of Wheat Ridge
1W V,
Residential Roofing PERMIT - 091640
PERMIT NO: 091640 ISSUED: 08/25/2009
JOB ADDRESS: 11762 W.34TH. AVE EXPIRES: 02/21/2010
DESCRIPTION: Reroof.37 sqs:
CONTACTS
owner 303/667-3100 - Kurt Diegel.. -
sub 303/774-8005 Alan Matthews 09-0265 3M. Construction Services
PARCEL INFO
ZONE CODE: UA.. USE: UA
SUBDIVISION: 0691 :.BLOCK/LOT#: 0/
**.FEE SUMMARY ESTIMATED PROJECT VALUATION: 7,400.00
FEES -
Permit Fee 199.30 `Total Valuation .00
UseTax 133.20 Nu
TOTAL 332.50
Conditions:'-:
36 :nail installation & mid-roof inspection required. Board sheathing spaced more -
than 'a 1/2 of an inch apart requires plywood overlay on entire roof. Ice and
water shield required from eave edge to 2'.:inside exterior walls.- -
Subject to field inspections.
I hereby certify: that the setback distances proposed by this. permit application are accurate, and do not violate. applicable
ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record;. that all
measurements' shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this
application and that I assume full responsibility for compliance with the:. Wheat Ridge. Building: Code. (I.B.C) and all other
ap icable W eat Ridge dinances, for work under this permit. Plans subject to field inspection.
gnature of c dr/ er & d u~-
1. This permit was issued in accordance with the provisions set forth in your application and is subject to the laws of the
State of Colorado and to the zoning Regulations and Building Codes of Wheat Ridge, `Colorado or any other applicable
ordinances of the City.:
2 'This permit shall expire. 180 days from the issue date. Requests for an extension must be received.. prior to expiration
date. An extension may. be granted at the discretion of the Building Official.
3. If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no
- changes have been or will be made in the. original plans and specifications and any suspension or abandonment has not
exceeded' one (1) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall
be paid for a'new.. permit.
41 No work of any manner shall be done that will change the natural flow of water causing a drainage' problem.
5. Contractor shall notify the Building Inspector twenty-four (24). Hours in advance for all inspections and shall receive
'written approval on inspection card before proceeding with successive phases. of the job.
6. The issuance. of a permit or. the approval of drawings and specifications shall not be construed to be a permit for, nor
an'. approval of, any violation of the :provisions of the building codes or any :other ordinance, law,. rule. or. regulation.
All plan review is subject to field inspections.
signature o Building Official.: date
INSPECT &MUSTQBE UEST LINE: (303)234-5933 BUILDING OFFICE: -(303)235-2855.
F.EQUES :MA DE BY< 3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING `BUSINESS DAY.
egrR City of Wheat Ridge Building Division Date:
7500 W. 29th Ave., Wheat Ridge, CO 80033
ice: 303-235-2855' Fax: 303-235-2857 Plan#:
Off
=V
`<Inspection Line: 303-234-5933 Permit
q
I~
Buildin Permit Application
~v r I 62 lJ r ~~A~~ LJO`e-aAriJ9e -i
Property Owner (please print): L- L,4 ae'a / Phone: 303- 6 6 / for)
Mailing Address: (if different than property address)
Address: //762 ~ y E~ Ue
City, State, Zip: 6LAe,y gj e 1 Cx) e
tar: J° CoAJx fCar~t6A)
Contractor License Phone: z 8a 7 ash
e
Electrical City License Plumbing City License Mechanical City License
Company: Company Company:
Exp. Date: Exp. Date: Exp. Date:
Approval: Approval: Approval:
Use of space description): R25,welil Cie Construction Value: -[00, O
- (as calculated per the Building Valuation Data sheet)
- - /Ze - y 60F
Plan Review (due at time of submittal): $
Sq. Ft./L. Ft added: Squares3-7 BTU's Gallons Amps
OWNERICONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances,
rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and
allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full
responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for work
under this permit. Plans subject to field ns ection.
CIRLCE ONE:: (OWNER) 51N TRACTOR) or PERSONAL REPRESENTATIVE (OWNE CON ATOR) PRINT NAMETOXAarj i SIGNATURE: Date: a°OZ7-p9
-s _ -._~r~ . . .
_
~
_ C ^ DEPARTMENT OF COM1v1UNITY DEVELO?MENT
7500 WEST 29tn AveNUE BUILDING INSPECTION DIVISION PERMIT N0. M91#17451
237-6944 EXT. 255 P.O. BoX ssa CITY OF WHEAT RiDGE, COLO.
THIS PERMIT VALID ONLY WHEN SIGNED BY TFiE CHIEF BUILDING INSPECTOR AND RECEIPTED BELrJW.
JOB ADDRESS
F n e"
CONTRACTOR 14 ~ ~ SQ % 8r0'1A2'r1
ADDRESS - j
CITY ZIPCODE Rd ZZ4"
PHONE 9~~ '~~'7 ! y LICENSENO. I 3~
OWNER 'q
ADDRESS U P
F'f
PHONE /"BoD -6 ZY - ZL/(o9 ~ ZIP CODE
CONTRACT PRICE $ Qq 90
DATE Q ` 3 C> ~ / I
1. TYPEGround❑
WoIl❑
ProieolinpU
Other
SorDFOee
2. MATERIAL
Total Squore Feet
SIGNS
3. ILLUMINATION Yea❑ No❑
TyOs
Eleet. Permit No.
SET BACK FROM PROPERTY LINE N
4
-
S_ E
_ W
Zona_
Approvad, Zone Inapsttor
.
(Specify whichiefronl)
❑
❑
❑ ❑
DiaopDroved
1. TYPE Solido Mo.e Than 80% OpenO
Less Than 80% Opan
MATERIAL
Heipht
FENCES
3 SET BACK FROM PROPERTY I.INE N
_
S_ E
_ W
ZonO_
Approved,Zons Inspetta
(Seecifv whiahiefrOnt)
~-1
U
❑
❑ ❑
_
DisapDroved
I.
OTHER
15,
DRAW SKETCH OR SHOW BELOW,THE FENCE,SIGN,OR OTHER STRUCTURE,GIVIM
(SETBACKS OR PROJECTIONS INCLUDED)
INSPECTION TICKET
JOB !
ADDRESS 7(a oL Ct~ J' CQ-w~
y
DATE: / a ~a ~-gLDG. PERMIT#
PERMIT#
BLDG. CONTR._
STREET NAME .
SHOW OISTANCES FROM THE MAIN BUILDIN6 T6ADJOINING HOUSES, STREETS, AI
DISTANCE TO PROPERTY LINES, NOT MAXIMUM OR AVERAGE OISTANf;E.
APPLICATION FOR PLUMBING; ELECTRICE
THIS APPLICATION WILL BECOME A PERMIT TO PERFORM THE INDICATED WORK
PEHMIT WILL EXPIRE 180 DAYS FROM THE DATE OF ISSUANCE.
SUBCONTRACTOR
DATE INSP. REQ. ~0
TYPE OF INSR QL . INSPECTION MADE
'1~A,5'.,-7 i? /
ELECTRICAL PERMIT
STATE LICENSE N0.
PLUMBING PERM
STATE LICENSE N0.
ALUMINUM NARE UNDER SRE 8 IILEGAL
FLOOR
BSM
IST
2 °
WATER CIASET
Np
TEMPORARY METER
WASH BOWL
W.R.FORM 6~9
NEW SERVICE AMPS
BATH TUB
CHANGE SERVICE-AMPS
SHOWER
LIGHTING
SINK
HEATING
POWER SUB-CIFCUITS
GARBAGE DISF
WATER HEATER
.
ryetrr eran.-w
UTILITY (RANGE, DISPOSER, ETC.)
AUTO.WASHER
Pounds Chor s
FIXTURES
DISH WASHER
AUTOMATIC SPRINKLER SYSTEM
WIRING MOTOF2S 9 CONTROLS
FLDOR DRAIN
ELEVATOR
SIGNS
URINAI
TRANSFORMERS9 RECTFIERS
SEWERS
ADDITION TO OLD WORK
OTHER
MOTORS OVER I HP
TOTAL FUCTURES
rico-
t rhis u
th
d
PERMIT FEE
~ y~ ~
pp
o
pe
I nereby ocknowle
d tnot I
t
d
53
ers
an
tion ia cmrect ond un
USE TAX
• (L1
connof sfart lhis projeet until this oppli-
ith
l
.
E
p
$
~
y w
cotion is aDproved. I sholl tomp
TOTAL FE
7r
a
the lawa of the Stote ot Colorodo ond to
the ZoninQ Repulations and Buildinq
A
APPROVED
ny
Code of the City of Wheoi Ridpe.
violotion o1 the above terme will couse
CHIEF BUILDING
PECTOR, City of Wheat Ridqe
:mmediate revocation of this permit
Date Issued-
. 'pU $i0namn
)T VALID UNLE55 RECEIPTED
a 44 fK V 2Ce
( S av 5/
CALL 237-8944 EXT. 255
24 HOURS IN ADVANCE
FORINSPECTIONS