HomeMy WebLinkAbout3001 Sheridan Boulevardi CITY!& WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: 3
Job Address:
Permit Number:
❑ No one available for inspection: Tim PM
Re -Inspection required: Yes ( No
When corrections have been made catfor e-inspectiop at 3Q3 X34
Dat - Inspe,-
DO NOT REIIIIOVE THIS NOTICE
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type:
Job Address:."`�
Permit Number: 'Z-(;='
❑ No one available for inspection: T6
Re -Inspection required: (e No
When corrections have been made, call r r ar►specVv ait3B3=234n5933
Date"7_ ' -f 9 Inspecto
DO NOT RENI/E THIS NOTICE
i_ CITY OF VVHEAT RIDGE
�
Building Inspection Division
(303) 234-5933 Inspection line
��'(303)
235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: `F/0,
Job Address: 7j,4i�
Permit Number:
❑ No one available for inspection: Time°`/PM
Re -Inspection required: Yes N
*When corrections have been made, all for re -inspection at 303-234-5933
Dater' Q- ):3f Inspector:
DO NOT REMOVE THIS NOTICE
rti
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type:
Job Address: `�' "%�% ''✓ !fir"�'1--� L_,
Permit Number:`"%/�L�
❑ No one available for inspection: TirnecK, MM
Re -Inspection required: Yes-, No../
When corrections have been made, call for re -inspection at 303-234-5933
Date:(---, P, Inspector:
DO NOT REMOVE THIS NOTICE
*** CONDITIONS ***
Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be
required for both the midroof and final inspections. The 3rd party inspection report AND
THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat
Ridge. The report MUST BE SIGNED by the Homeowner.
REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec.
R806. The installation of ridge venting requires the installation or existence of soffit
venting. For calculation purposes, one hat or turtle vent equal to one-half of one square
foot of opening.
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75% of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75% of the mid -roof may be complete. Asphalt shingles are required to be
fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is
required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name) roof
covering" is required to be on at the time of final inspection.
City of Wheat Ridge
Residential Roofing PERMIT -
201901291
PERMIT NO:
201901291
ISSUED:
06/21/2019
JOB ADDRESS:
3001 Sheridan Blvd
EXPIRES:
06/20/2020
JOB DESCRIPTION:
Replace asphalt shingles, 4/12 pitch, 24 squares
*** CONTACTS ***
OWNER (303)233-1992 ANDERSEN ROBERT MOHAN
SUB (303)761-6400 J. BRETZ
018118 EXCEL ROOFING, INC.
*** PARCEL INFO
***
ZONE CODE: -
UA / Unassigned
USE:
R-3 / Residential
SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS,
OLI BLOCK/LOT#:
0 /
*** FEE SUMMARY
*** ESTIMATED PROJECT VALUATION:
12,000.00
FEES
Total Valuation
0.00
Use Tax
252.00
Permit Fee
236.00
** TOTAL **
488.00
*** COMMENTS ***
*** CONDITIONS ***
Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be
required for both the midroof and final inspections. The 3rd party inspection report AND
THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat
Ridge. The report MUST BE SIGNED by the Homeowner.
REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec.
R806. The installation of ridge venting requires the installation or existence of soffit
venting. For calculation purposes, one hat or turtle vent equal to one-half of one square
foot of opening.
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75% of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75% of the mid -roof may be complete. Asphalt shingles are required to be
fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is
required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name) roof
covering" is required to be on at the time of final inspection.
City of Wheat Ridge
Residential Roofing PERMIT - 201901291
PERMIT NO: 201901291 ISSUED:
JOB ADDRESS: 3001 Sheridan Blvd EXPIRES:
JOB DESCRIPTION: Replace asphalt shingles, 4/12 pitch, 24 squares
06/21/2019
06/20/2020
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorize? to obtain this permit and perform the work described and approved in conjunction with
this ermrt. I further attest that I am Iegally authorized to include all entities named within this document as parties to the work toe
performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signature of OWNER or CONTRACTOR (Circle one) Date
I . This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original pennit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Offipcial and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
5, The issuance or granting of a permit shall not be construed to be a permit for or an approval of, any violation of any provision of any
applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building'OfMal ""' Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
qo )--q
Kimberly Cook
1� � l
From:
no-reply@ci.wheat ridge.co.us
Sent:
Friday, June 21, 2019 12:35 PM
To:
CommDev Permits
Subject:
Online Form Submittal: Residential Roofing Permit Application
Residential Roofing Permit Application
This application is exclusively for new RESIDENTIAL roofing permits and for
licensed contractors only. Permits are processed and issued in the order they are
received. You will be notified if your contractor's license or insurance has
expired. The license and insurance must be current before the permit will be
processed.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in
person at City Hall. Revisions to existing permits (for example, to add
redecking) must be completed in person at City Hall. The Building Division
permit counter is open from 7:30 am to 3:30 pm, Monday through Friday to
process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a
RESIDENTIAL reroof
permit?
How many dwelling units
are on the property?
Yes
Single Family Home
PROPERTY INFORMATION
Property Address
Property Owner Name
Property Owner Phone
Number (enter WITH
dashes, eg 303-123-4567)
Property Owner Email
Address
3001 Sheridan Blvd
Robert & Sherry Andersen
303-233-1992
Field not completed.
Do you have a signed
Yes
contract to reroof this
property?
CONTRACTOR INFORMATION
Contractor Business
Excel Roofing, Inc
Name
Contractor's License
018118
Number
Contractor Phone
303-761-6400
Number (enter WITH
dashes, eg 303-123-4567)
Contractor Email Address
excel@excelroofing.com
Retype Contractor Email
excel@excelroofing.com
Address
REQUIRED: Credit Card
Wheat Ridge CC.pdf
Authorization Form
DESCRIPTION OF WORK
TOTAL SQUARES of
24
the entire scope of work:
Project Value (contract
12000.00
value or cost of ALL
materials and labor)
Are you re -decking the
No
roof?
Is the permit for a flat
Pitched roof (2:12 pitch or greater)
roof, pitched roof, or
both? (check all that
apply)
What is the specific pitch
4/12
of the PITCHED roof?
How many squares are
24
part of the PITCHED
roof?
Describe the roofing
Owens Corning Duration Storm
materials for the
PITCHED roof:
2
Type of material for the Asphalt
PITCHED roof:
Provide any additional House
detail here on the
description of work. (Is
this for a house or
garage? Etc)
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this Yes
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
I attest that everything Yes
stated in this application
is true and correct and
that falsifying
information in this
application is an act of
fraud and may be
punishable by fine,
imprisonment, or both.
3
Person Applying for Norma Navarro
Permit
Email not displaying correctly? View it in your browser.
Citi of Wheat Ridge
Residential Solar PERMIT - 201901169
PERMIT NO: 201901169 ISSUED: 06/11/2019
JOB ADDRESS: 3001 Sheridan Blvd EXPIRES: 06/10/2020
JOB DESCRIPTION: Install PV solar system, 4.8 kw; 16 modules, no structural required
*** CONTACTS ***
OWNER (303)233-1992 ANDERSEN ROBERT MOHAN
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: R-3 / Residential
SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 10,116.00
FEES
Total Valuation 0.00
Residential Solar 500.00
** TOTAL ** 500.00
*** COMMENTS ***
*** CONDITIONS ***
Approved per plans and red -line notes on plans. Must comply with 2012 IRC, 2017 NEC and all
applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections.
I by my signature do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
thispermrt. I further attest that I am legally authorized to include all entities named within this document as partes to the work to be
performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signature of OWNER or CONTRACTOR (Circle one) Date
1. This permit was issued based on the information provided in thepermit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new pen -nit shall be subject to the standard
requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired pen -nits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all re uired
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or gfanting of a p"it
ll not be construed to be a permit for, or an approval of, any violation of any provision of any
applicable cod" an�dmalation of this jurisdiction. Approval of work is subject to field inspection.
evv. a
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
City of
CoMmuNiTy DEVELOPMENT
Building & Inspection Services
7500 W. 2911 Ave., Wheat Ridge, CO 80033
Office: 303-235-2855 * Fax: 303-237-8929
Inspection Line: 303-234-5933
Email: permits@ci.wheatridge.co. us
FOR OFFICE USE ONLY
Date: 0/ 7//?
Plan/Permit # 900 olib7
Plan Review Fee: 4So() v 3
Building Permit Application
*** Complete all applicable highlighted areas on both sides of this form.
Incomplete applications may not be processed. ***
Property Address: 3001 Sheridan Boulevard, Wheat Ridge, Colorado, 80214, United States
Property Owner (please prino: Bob Andersen Phone: 3038106104
Property Owner Email: bobandersen251@hotmail.com
Tenant Name (Commercial Projects Only)
Property Owner Mailing Address: (if different than property address)
Address:
City, State, Zip:
Architect/Engineer:
Architect/Engineer E-mail:
Contractor Name: BRS Field Ops LLC
City of Wheat Ridge License #:
180271
Phone:
Phone:
Contractor E-mail Address: permitting.department@blueravensolar.com
For Plan Review Questions & Comments (please print):
385-482-0045
CONTACT NAME (please print): Justin Mack Phone: 385-482-0045
CONTACT EMAIL(p/ease print): permitting.department@blueravensolar.com
Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form):
Electrical: Plumbing: Mechanical:
W.R. City License # W.R. City License # W.R. City License #
Other City Licensed Sub: Other City Licensed Sub:
City License # City License #
Complete all highlighted fields.
❑COMMERCIAL D RESIDENTIAL
Provide description of work: For ALL projects, provide a detailed description of work to be
performed, including current use of areas, proposed uses, square footage, existing condition and
proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc.
Residential Solar Rooftop PV System 4.8 kW
SCOPE OF WORK INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM 4.8 kW DC
PHOTOVOLTAIC SOLAR ARRAY ROOF TYPE: Comp Shingle MODULES: (16) Trinasolar 300 TSM-DD05A.05(II)
INVERTER(S): Enphase IQ7-60-2-US,--- RACKING: Unirac Sunframe Microrail
Sq. Ft./LF
BTUs
Gallons
Amps Squares For Solar: 1(1N # of Panels l Requires Structural
/t,�
For Commercial Projects Only: Occupancy Type: Construction Type:
Occupancy Load: Square Footage:
Project Value: (Contract value or the cost of all materials and labor included in the entire project)
$ 10116
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or
regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are
accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance
with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner
or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any
entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the
truthfulness of the information provided on the application.
CIRCLEONE. (OWNER) (CONTRACTOR) or (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR)
For BRS Field Ops LLC 06/06/2019
SiEnature (first and last name):
Justin Mack
Printed Name:
ZONING COMMMENTS:
Reviewer:
BUILDI G PARTMENT COMMENTS
Revie ec
,.��,... cc .
PUBLIC WORKS COMMENTS:
Reviewer:
DEPARTMENT USE ONLY
DATE:
OCCUPANCY CLASSIFICATION:
CONSTRUCTION TYPE:
Building Division Valuation:
T ! C TI,- T A L
=-NTGINEiT•G LLC
June 5, 2019
To: Blue Raven Solar
1403 North Research Way, Building J
Orem, UT. 84097
Subject: Certification Letter
Andersen Residence
3001 Sheridan Blvd.
Wheat Ridge, CO. 80214
To Whom It May Concern,
Domus Structural Engineering, LLC
P.O. Box 6986
Broomfield, CO 80021
530-864-7055
Domusstructural@gmail.com
Digitally signed by John Calvert
Date: 2019.06.05 11:11:46 -0600'
Ajobsite observation of the condition of the existing framing system was performed by an audit team of Blue Raven Solar as a
request from Domus Structural Engineering. All review is based on these observations and the design criteria listed below and
only deemed valid if provided information is true and accurate.
On the above referenced project, the roof structural framing has been reviewed for additional loading due to the installation of
the solar PV addition to the roof. The structural review only applies to the section of the roof that is directly supporting the solar
PV system and its supporting elements. The observed roof framing is described below. If field conditions differ, contractor to
notify engineer prior to starting construction.
The roof structure of (MP1) consists of composition shingle on 1x decking that is supported by 2x6 rafters @ 16"o.c. with ceiling
joists acting as rafter ties. The rafters have a max projected horizontal span of 8'-0", with a slope of 23 degrees. The rafters are
connected at the ridge to a ridge board and are supported at the eave by a load bearing wall.
The existing roof framing system of (MP1) is judged to be adequate to withstand the loading imposed by the installation of the
solar panels. No reinforcement is necessary.
The spacing of the solar standoffs should be kept at 64" o.c. for landscape and 48" o.c. for portrait orientation, with a staggered
pattern to ensure proper distribution of loads.
The scope of this report is strictly limited to an evaluation of the fastener attachment, underlying framing and supporting
structure only. The attachment's to the existing structure are required to be in a staggered pattern to ensure proper distribution
of loading. All panels, racking and hardware shall be installed per manufacturer specifications and within specified design
limitations. All waterproofing shall be provided by the manufacturer. Domus Structural Engineering assumes no responsibility for
misuse or improper installation of the solar PV panels or racking.
Note: Seismic check is not required since Ss<.4g and Seismic Design Category (SDC) < B
Design Criteria:
• Applicable Codes = 2012 IBC/IRC, ASCE 7-10 City of
• Roof Dead Load = 9 psf (MP1)
• Roof Live Load = 20 psf
• Wind Speed = 135 mph (Vult), Exposure C, Risk Category II ,N�oQt�g�d9®
• Roof Snow Load = 30 psf Cy}�tis�oA
• Attachments: 1- 5/16" dia. lag screw with 2.5 inch min embedment depth, at spacing shown above.
Please contact me with any further questions or concerns regarding this project.
Sincerely,
John Calvert, P.E.
Project Engineer Andersen Residence, Wheat Ridge, CO 1
Domus Structural Engineering, LLC
o _m v5, P.O. Box 6986
Broomfield, CO 80021
S T R F, C T t , N L530-864-7055
-E r Gx T N F E R I N 0, T. L to Domusstructural@gmail.com
Gravity Loading
Roof Snow Load Calculations
3.26 psf
p9 = Ground Snow Load =
30 psf
pf = 0.7 Ce Ct I p9
(ASCE7 - Eq 7-1)
Ce = Exposure Factor =
1 (ASCE7 - Table 7-2)
C, = Thermal Factor =
1 (ASCE7 - Table 7-3)
1= Importance Factor =
1
pf = Flat Roof Snow Load =
30.0 psf
ps = Cspf
(ASCE7 - Eq 7-2)
Cs = Slope Factor =
1
ps = Sloped Roof Snow Load =
30.0 psf
PV Dead Load = 3 psf (Per Blue Raven Solar)
DL Adjusted to 23 Degree Slope
3.26 psf
PV System Weight
3.00
Weight of PV System (Per Blue Raven Solar)
3.0 psf
X Standoff Spacing =
4.00 ft
Y Standoff Spacing =
5.50 ft
Standoff Tributary Area =
22.00 sft
Point Loads of Standoffs
66 Ib
Note: PV standoffs are staggered to ensure proper distribution of loading
Roof Live Load = 20 psf
Note: Roof live load is removed in area's covered by PV array.
Roof Dead Load (MPI)
Composition Shingle
4.00
1x Decking
3.00
2x6 Rafters @ 16"o.c.
1.72
Vaulted Ceiling
0.00 (Ceiling Not Vaulted)
Miscellaneous
0.28
Total Roof DL (MPI)
9.0 psf
DL Adjusted to 23 Degree Slope
9.8 psf
C:1W of
wheat 9i690
SA 9
'pe
Andersen Residence, Wheat Ridge, CO 2
0X1 IT
Domus Structural Engineering, LLC
P.O. Box 6986
Broomfield, CO 80021
530-864-7055
Domusstructural@gmail.com
Wind Calculations
Per ASCE 7-10 Components and Cladding
Input Variables
Wind Speed
135 mph
Exposure Category
C
Roof Shape
Hip/Gable
Roof Slope
23 degrees
Mean Roof Height
15 ft
Effective Wind Area
193 ft
Design Wind Pressure Calculations
Wind Pressure P = qh*G*Cn
qh = 0.00256 * Kz * Kzt * Kd * V^2
(Eq. 30.3-1)
Kz (Exposure Coefficient) = 0.85
(Table 30.3-1)
Kzt (topographic factor) = 1
(Fig. 26.8-1)
Kd (Wind Directionality Factor) = 0.85
(Table 26.6-1)
V (Design Wind Speed) = 135 mph (Fig. 26.5-1 A)
Risk Category= II (Table 1.5-1)
qh = 33.71
0.6 * qh = 20.23
Standoff Uplift Calculations -Portrait
Zone 1 Zone 2
Zone 3
Positive
GCp = -0.84 -1.39
-2.23
0.38 (Fig. 30.4-1)
Uplift Pressure = -16.95 psf -28.11 psf
-45.06 psf
12.7 psf
X Standoff Spacing = 4.00 4.00
2.67
Y Standoff Spacing = 5.50 2.75
2.75
Tributary Area = 22.00 11.00
7.33
Footing Uplift = -373 Ib -309 Ib
-330 Ib
Standoff Uplift Calculations -Landscape
Zone 1 Zone 2
Zone 3
Positive
GCp = -0.84 -1.39
-2.23
0.38 (Fig. 30.4-1)
Uplift Pressure = -16.95 psf -28.11 psf
-45.06 psf
10.0 psf (Minimum)
X Standoff Spacing = 5.33 5.33
3.56
Y Standoff Spacing = 3.50 1.75
1.75
Tributary Area = 18.67 9.33
6.22
Footing Uplift= -316 lb -262 lb
-280 lb
Standoff Uplift Check
Maximum Design Uplift = -373 Ib
Standoff Uplift Capacity = 450 Ib
City of
450 Ib capacity > 373 Ib demand Therefore, OK
Wheat Ridge
Fastener Capacity Check
Building Division
Fastener = 1 - 5,116" dia. lag
Number of Fasteners = 1
Embedment Depth = 2.5
Pullout Capacity Per Inch = 250 Ib
Fastener Capacity = 625 Ib
w/ F.S. of 1.5 & DOL of 1.6= 667 Ib
667.2 Ib capacity > 373 Ib demand Therefore, OK
Andersen Residence, Wheat Ridge, CO 3
o t .
S"
Domus Structural Engineering, LLC
P.O. Box 6986
Broomfield, CO 80021
530-864-7055
- ; t g T N E F R "T 3"'+ G T T. C Domusstructural@gmail.com
Framing Check
(MP1) PASS
w = 57 plf
Dead Load 9.8 psf
PV Load 3.3 psf
Snow Load 30.0 psf 2x6 Rafters @ 16"o.c.
Governing Load Combo = DL + SL Member Span = 8'- 0"
Total Load 43.0 psf
Member Properties
Member Size S (in ^3) 1 (in^4) Lumber Sp/Gr Member Spacing
2x6 7.56 20.80 DF#2 @ 16"o.c.
Check Bending Stress
Fb (psi) = fb x Cd x Cf x Cr (NDS Table 4.3.1)
900 x 1.15 x 1.3 x 1.15
Allowed Bending Stress = 1547.3 psi
Maximum Moment = (wL^2)/8
= 459.0541 ft#
= 5508.65 in#
Actual Bending Stress = (Maximum Moment) / S
= 728.5 psi
Allowed > Actual -- 47.1% Stressed -- Therefore, OK
Check Deflection
Allowed Deflection (Total Load) = U180 (E = 1600000 psi Per NDS)
= 0.533 in
Deflection Criteria Based on = Continuous Span
Actual Deflection (Total Load) _ (w*L^4) / (185*E*I)
= 0.066 in
= L/1455 > L/180 Therefore Cls
Allowed Deflection (Live Load) =
Actual Deflection (Live Load) =
U240
0.4 in
(w*L^4) / (185*E*I)
0.046 in
02087 > L/240 Therefore OK
A Check Shear G,1" of
Member Area= 8.3 in 2 Fv (psi) = 180 psi (NDS Table 4A)
e
Allowed Shear = Fv * A = 1485 Ib Max Shear (V) = w * L / 2 = 230 Ib SR%d9
Allowed > Actual •-15.5"1 Stressed -- Therefore, OK ��tcaa
Andersen Residence, Wheat Ridge, CO 4
GENERAL NOTES
AERIAL VIEW
CODES AND STANDARDS
.... . . ..... . .... . . . . . . ........ . .....
1. ALL WORK SHALL COMPLY WITH 2017 NATIONAL ELECTRIC CODE (NEC), 2015
INTERNATIONAL RESIDENTIAL CODE (IRC), 2015 INTERNATIONAL BUILDING CODE (IBC), 2015
BLUE RAVEN
INTERNATIONAL PLUMBING CODE (IPC), AND ALL STATE AND LOCAL BUILDING, ELECTRICAL,
AND PLUMBING CODES,
2. DRAWINGS HAVE BEEN DETAILED ACCORDING TO UL LISTING REQUIREMENTS.
1403 N RESEARCH WAY, BUILDING J
3. TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE
SPECIFICATIONS (WHEN PROVIDED) IN ACCORDANCE WITH NEC CODE 110.14(D) ON ALL
OREM. U F 84097
ELECTRICAL CONNECTIONS.
800-377-4480
SITE NOTES I OSHA REGULATION
',,',!',t,,At,/.BLUERAVENSOLAR.COM
CONFIDENTIAL - THE INFORMATION
1. A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS.
2. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS AN UTILITY
HEREIN CONTAINED SHALL NOT BE
INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES.
USED FOR THE BENEFIT OF
3. THE SOLAR PV INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR
ANYONE EXCEPT
BLUERAVENSOLAR NOR SHALL I
BUILDING ROOF VENTS.
t
BE DISCLOSED IN WHOLE OR IN
4. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH
THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF
PART TO OTHERS OUTSIDE
RECIPIENTS ORGANIZATION,
COVERING SHALL SERVE TO PROTECT THE BUILDING OR STRUCTURE.
EXCEPT IN CONNEC TIONVOTH THE
SALE AND USE OF THE RESPECTIVE
EQUIPr,1ENI,V,,'IIHOUT THE
SOLAR CONTRACTOR
VVRITfEN PERMISSION OF
BLUERAVENSOLAR LLC.
1. MODULE CERTIFICATIONS WILL INCLUDE UL1703; IEC61646, IEC61730.
2. IF APPLICABLE, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE MARKED GROUNDING
LUG HOLES PER THE MANUFACTURERS INSTALLATION REQUIREMENTS,
3. AS INDICATED BY DESIGN, OTHER NRTL LISTED MODULE GROUNDING DEVICES MAY BE USED
NABCEP
IN PLACE OF STANDARD GROUNDING LUGS AS SHOWN IN MANUFACTURER DOCUMENTATION
LCERT FIED
AND APPROVED BY THE AHJ.
PV INSTALLATION
4. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND
PROFESSIONAL
ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS.
a.
5, CONDUIT POINT OF PENETRATION FROM EXTERIOR TO INTERIOR TO BE INSTALLED AND
Scott Gurney
PV-01 1719-015866
SEALED WITH A SUITABLE SEALING COMPOUND.
CONTRACTOR:
6. DC WIRING LIMITED TO MODULE FOOTPRINT VV/ ENPHASE AC SYSTEM.
7. ENPHASE WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY VVIBRS
FIELD OPS
SUITABLE WIRING CLIPS.
8. MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR
385A98.6700
VOC UNLESS NOT AVAILABLE-
9- ALL INVERTERS, MOTOR GENERATORS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS,
AC PHOTOVOLTAIC MODULES, DC COMBINERS, DC-TO-DC CONVERTERS, SOU RCE CIRCUIT
COMBINERS, AND CHARGE CONTROLLERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER
SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (B).
10. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE.
C\j
C:)
EQUIPMENT LOCATIONS
1. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED
_0 00 -he
ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION [NEC 110.26].
cu 0 00
>
2. EQUIPMENT INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING
z
DESIGN CRITERIA SITE SPECIFICATIONS
SHEET
TEMPERATURE AS SPECIFIED BY [NEC 690,31 (A,)-(B,)] AND [NEC TABLE 310.15 (B)I,
0
L
3. ADDITIONAL AC DISCONNECTS SHALL BE PROVIDED WHERE THE INVERTER IS NOT ADJACENT
ASCE 7 WIND SPEED: 120 MPH OCCUPANCY - R3
PV1 - COVER SHEET
0 -2
F_ CC 0 N
< C)
TO THE UTILITY AC DISCONNECT, OR NOT WITHIN SIGHT OF THE UTILITY AC DISCONNECT,
C: CO
4. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING
GROUND SNOW LOAD: 30 PSF CONSTRUCTION - V-B
PV2 - PROPERTY PLAN
Ctij
TO NEC APPLICABLE CODES.
EXPOSURE CATEGORY: C ZONING: RESIDENTIAL
PV3 - SITE PLAN
Ir- (n 70 CM
0 - " -0 Uj
5
,, ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE
SEISMIC DESIGN CATEGORY: B
PV4 - EQUIPMENT & ATTACHMENT DETAIL
L.L 0 i2
-0
WHENAPPROPRIATE.
z =
PV5 - ELECTRICAL SINGLE LINE DIAGRAM
U)
< M
CAY
of
SCOPE OF WORK
PV6 - ELECTRICAL CALCULATIONS &
Uj -0
0 CD�
C) 0
ELECTRICAL NOTES
APPROVED
INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM
PV7 - MAIN BREAKER DEBATE CALLS.
DRAVVNG BY
(IF NEEDED)
Kate Petersen
Reviewed for _CWk Complie
4.8 kW DC PHOTOVOLTAIC SOLAR ARRAY
PV8 - LABELS & LOCATIONS
Ir
ROOF TYPE: Comp Shingle
MODULES: (16) Trinasolar 300 TSM-DD05A.05(11)
PV9 - CUSTOM DIRECTORY PLACARD
(IF NEEDED - NEC 690.56(B))
DATE
June 5, 2019
INVERTER(S): Enphase 107-60-2-US,----
PROJECT W.-NIBER
Mans f.arnint'f pMe
RACKING: Unirac Sunfranne Microrail
62537179
: TAC -v—,r of PC~ or Approva ofpb. softow'"
Notes:
an=
d"IWQIAOM 5hoNAW be a pe—iffo,; or on*AwvvaIt WW�j�&.jjm t,
SHEET NMOE
my Of dW Pfow�on% ofthe ft"no code ot of ony Cay oswkwam. ft min
1)Verify or provide supplemental ground rod or
COVER SHEET
prc-"*Vtopiwr0—kytow0weoftancNtoww0wimm elift awksw
rods per 2017 NEC Art. 250.53(A)(2).
4"ff of other cr&w*res of the ctry ow not he wlt0
2) Natural Gas piping to be bonded s per 2017 NEC
PAGE NUMBER
REVISION
Art. 250.104(B).
PV
0
3 )Bond P/V panels to the building Grounding
1VUU �YbLtV I I per zui I IN 1:1- Art. byU(A).
LEGEND
EINVERTER & DC DISCONNECT BLUE RAVEN
SUB (E) SUBPANEL
LC (N) LOAD CENTER 1403 N RESEARCH ;-JAY. BUILDING J
OREM, UT 84097
AC AC DISCONNECT 800-377-4480
4,"PN'Oi.BLUERAVENSOLA.R.COt,,I
UTILITY PNKETER/SERVICE PANEL CONFIDENTIAL. - THE INFORMATION
HEREIN CONTAINED SHALL NOT BE
USED FOR THE BENEFIT OF
I I E]JUNCTION BOX ANYONE EXCEPT
BLUERAVENSOLAR NOR SHALL IT
130'-5" BE DISCLOSED IN WHOLE OR IN
COMBINER BOX PART TO OTHERS OUTSIDE
RECIPIENTS ORGANIZATION,
EXCEPT IN CONNEC TIONV,,fITH THE
PV PV REVENUE METER SALE AND USE OF THE RESPECTIVE
EQUIPMENT. 4-,,'ITHOLT THE
N %AJRrrTEN PERMISSION OF
0
C 0 FIRE SETBACK BLUERAVENSOLAR LLC,
0 0
AC 0
777 EMT CONDUIT RUN
PV 0 (10 BE DETERMINED IN FIELD) NABCEP
msp -00 0 F—CERTIFIED
PV WIFE STRING
MPV INSTALLATION
JB PROFESSIONAL
Scott Gurney
PROPERTY LINE PV-01 1719-015866
57' MP1
# OF MODULES: 16 SCALE: 1/16" V-0" CONTRACTOR:
BRS FIELD OPS
AZIMUTH:180'
PITCH :23' 385.498.6700
TSRF:93%
AREA: 733 SQ. FT
FRONT OF HOME
cat
C:)
-2 Co
to 0 Co
z Q) CU
> -0 4
3001 Sheridan Boulevard 0 :3
m0 -2 L
0 N
< U)
2E
Crcry(D
0 Lij
LL
z
<
U)
C)
cn
m
0 ® 0
(y)
DRAWING BY
amity 01 Kate Petersen
N000009 D4,TE June 5, 2019
DC SYSTEM SIZE: 4.8 kW DC 62537179
ROOF TYPE: Comp Shingle SHEETINAME
(16) Trinasolar300TSM-DD05A.05(li) PROPERTY PLAN
Enphase IQ7-60-2-US, ---- INVERTER P=37- NUMBER REVISION
PV2 0
LEGEND
INVERTER & DC DISCONNECT BLUE RAVEN
SUB (E) SUBPANEL
(N) LOAD CENTER 1403 N RESEARCH SEARCH WAY. BUILDING JOREM. UT 84097
AC AC DISCONNECT 800-377-4480
VW1W.BLUERAVENSCLAR.COM
UTILITY METER 1; SERVICE PANEL CONFIDENTIAL. -THE INFORMATION
HEREIN CONTAINED SHALL NOT BE
USED FOR THE BENEFIT OF
EJUNCTION BOX ANYONE EXCEPT
BLUERAVENSOLAR NOR SHALL IT
BE DISCLOSED IN V,JHOLE OR IN
I—COMBINER BOX PART TO OTHERS OUTSIDE
C I RECIPIENTS ORGANIZATION,
EXCEPT IN CONNEC TION WITH THE
PV PV REVENUE METER SALE AND USE OF THE RESPECT IVE
EQUIPMENT, V',11THOUT THE
WRITTEN PERI'vIISSION OF
CHIMNEY N FIRE SETBACK BLUERAVENSOLAR LLC.
C EIVIT CONDUIT RUN
0 0 (TO BE DETERMINED IN FIELD) /NABCEP\
AC 0 PV WIRE S TRING I CERTIFIED
PV 0 PV INSTALLATION
PROFESSIONAL
0
ooPROPERTY LINE Scott Gurney
MSP 0 # PV -01 1719-015666
M SCALE: 3/32" = 1'-0" CONTRACTOR:
4 BRS FIELD OPS
385.498.6700
151-711
MI I
#OF MODULES: 16
AZIMUTH:180'
Sealed For
PITCH:23' 0
Existing Roof & -2 00
61'-4" TSRF:93% CU 0 00
AREA: 733 SQ. FT Attachment Only z >
a)
64'-11 0 -5
0 -2 L
U)
Cr (D
W
FRONT OF HOME LL 0
zU)
C U)
<
w
0
0 0
W co M
*9 43019 �i
DRANING BY
ok Kate Petersen
0% V10gp -1 DATE June 5, 2019
0 W.xs'p
Digitally signed by John C PROJECT NLAIIBER
Date: 2019.06.0511:12:47- 0' 62537179
DC SYSTEM SIZE: 4.8 kW DC
ROOF TYPE: Comp Shingle SHEET NAME
SITE PLAN
(16) Trinasolar 300 TSM-DD05A.05(il)
Enphase IQ7-60-2-US ----- INVERTER PAGE NUMBER R-VlSiON
PV3 0
w 1 w w t � w •
H
LL
O
❑
Z
Q _
f- o
O
�m
O
mM
U
J V)
Q
F -
w
LL
LL
O
Z
F�-
U)
D_ o
O
w II
J -
❑ (y)
❑ 6
:�E m
C)
J W
I
PV MODULE COUNT: 16 MODULES
OF ATTACHMENT POINTS: 28
ARRAY AREA: Module Count x 17.51ft2 = 280.2ft2
ROOF AREA: 2169.0ft2
% OF ARRAY/ROOF: 12.9%
ARRAY WEIGHT: Module Count x 501bs = 800.01bs
DISTRIBUTED LOAD: Array Weight _ Array Area = 2.86 lbs/ft'
POINT LOAD: Array Weight _ Attachments = 28.6lbs/attachment
game Microrail
[MRAIL
Trinasolar 300 TSM-DD05A.05(II)
PV MODULE
(E) ROOF
MEMBRANE
UNIRAC SLIDERS AND
TRIMRAIL ROOF ATTACHMENTS
FLASHING
5/16" STAINLESS STEEL LAG BOLT
WITH 2-1/2" MIN. EMBEDMENT
AND FLAT WASHER
(E) BUILDING
STRUCTURE
Unirac Sunframe Microrail
Trinasolar 300 TSM-DD05A.05(II)
PV MODULE
(E) ROOF
MEMBRANE
UNIRAC SLIDERS
FLASHING
5/16" STAINLESS STEEL LAG BOLT
WITH 2-1/2" MIN. EMBEDMENT
AND FLAT WASHER
(E) BUILDING
STRUCTURE
PV MODULE (BEHIND TRIM RAIL)
I MAX' - 64" MAX. - -
Unirac Sunframe Microrail TRIM RAI!
4 !LANDSCAPE
SFM Raised Seal Flashing
RACKING ATTACHMENTS TO BE Unirac Sunframe Microrail FRAME
STAGGERED BY SHIFTING EACH
SUBSEQUENT ROVJ OF ATTACHMENTS �\
ONE RAFTER OVER. f !
PV4
PORTRAIT
ARRAY DETAIL, FRONT VIEW
Scale: 3/8" = V-0"
PORTRAIT
LANDSCAPE
ZAY DETAIL; SIDE VIEW
Scale: 3/8" = V-0"
"O! • Shingle
RAFTER OR TOP CHORD(TRUSS) 2x6 @ 16"O.C.
CEILING JOIST OR BOTTOM CHORD(TRUSS) 2x6 @ 16"O.C.
■I
Sealed oI I
Existing Roof i
:Attachment
y
John Calvert
Date: 2019.06.05
11:12:59 -06100'
BLUE RAVEN
1403 N RESEARCH'lAY. BUILDING J
OREM, UT 84097
800.377.4480
VV`71M✓. BLUERAVEN SOLAR. CONI
CONFIDENTIAL -THE INFORMATION
HEREIN CONTAINED SHALL NOT BE.
USED FOR THE BENEFIT OF
ANYONE EXCEPT
BLUERAVENSOLAR NOR SHALL IT
BE DISCLOSED IN VdHOLE OR IN
PART TO OTHERS OUTSIDE
RECIPIENTS ORGANIZATION,
EXCEPT IN CONNEC TION'VVITH THE
SALE AND USE OF THE RESPECTIVE
EQUIPtAENT;'WITHOUT THE
WRITTEN PERMISSION OF
BLUERAVENSOLARLLC.
IACEP
CERTIFIED
PV INSTALLATION
PROFESSIONAL
Scott Gurney
# PV -011719-015866
CONTRACTOR:
BRS FIELD OPS
385.498.6700
DATE
t.• June 5, 2019
ryh0Qf R, PROJECT NU;IBE.R
It a 62537179
SHEET NAME
— EQUIP. DETAIL
. GE NUMBE., R'Vi:"CN
PV4 0
U
r
❑
0
-0
M
U
00
Z
N
4�6
®
0
N
U)
®
Cn0
L
L
L/
W
U)
Ziz
Lij
U)
o
U)
co
❑
DRAWING
B
Kate Petersen
DATE
t.• June 5, 2019
ryh0Qf R, PROJECT NU;IBE.R
It a 62537179
SHEET NAME
— EQUIP. DETAIL
. GE NUMBE., R'Vi:"CN
PV4 0
(1) 10 AWGTHHN/THWN-2, CU., BLACK (Ll) 16.0 A AC (1) 10 - 2 OF -B W/G, THHN/THWN-2, SOLID CU. MAX 16.0 A A (1) 10 - 2 OF -B W/G, THHN/THWN-2, SOLID CU. MAX 16.0 AA (1) 12-2TC-ER,THWN-2, CU. MAX 16.0 A AC
15 (1) 10 AWGTHHN/THWN-2, CU., RED (1-2) 240 V AC 3 240 V AC 2 240 V AC 1 (1) 6 AWG BARE, CU (EGC) 240 V AC
(1) 10 AWGTHHN/THWN-2, CU., WHITE (N)
New—
(1) 10 AWG TH H N/THWN -2, CU., GREEN (EGC)
(1) 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT EXTERIOR INTERIOR
EXTERIORBLUE RAVEN
1. ALL CONDUIT TO BE RAN AT LEAST 7/8" ABOVE ROOF SURFACE WHERE EXPOSED TO SUNLIGHT,
2. TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS (WHEN
PROVIDED) IN ACCORDANCE WITH NEC CODE 110.14(D) ON ALL ELECTRICAL CONNECTIONS.
3, CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND
ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS.
(E)200A MAIN SERVICE PANEL
(E)200A / 2P MAIN BREAKER
(E)
(E)200A / 2P
(E)LOADS
(N)20A/2P
N
120/240 VAC F
60HZ
TO UTILITY
GRID
I I I G
UTILITY PV
PRODUCTION
METER 200A
LEVER BYPASS
METER SOCKET
PV BREAKER TO BE LOCATED OPPOSITE
END OF BUSSING FROM MAIN BREAKER
(E) GROUNDING
ELECTRODE (S)
Notes:
1)Verify or provide supplemental ground rod or
rods per 2017 NEC Art. 250.53(A)(2).
2) Natural Gas piping to be bonded s per 2017 NEC
Art. 250.104(B).
3)Bond P/V panels to the building Grounding
Electrode System per 2017 NEC Art. 690(A).
PV AC DISCONNECT
NON-FUSED
LOCKABLE, VISIBLE OPEN
30A, 240V. 2 -POLE
Enphase IQ Combiner 3
X-10-AMl-240-3
(SOLAR LOADS ONLY)
-JUNCTION BOX(S)
FOR WIRE SPLICING
ONLY - OPTIONAL IF
(16) Trinasolar 300 TSM-DD05A.05(II)
UL 1703 COMPLIANT
(16) Enphase IQ7-60-2-US MICRO INVERTERS
UL 1741 COMPLIANT
8 MODULES MAX FOR ALL SUB -BRANCH
CIRCUIT(S) TO COMPLY WITH VRISE CALCS
(1) CIRCUIT
OF 16 MODULES
ENPHASE COMBINER BOX WILL BE
ACCESSIBLE TO UTILITY COMPANY 24/7
INTERCONNECTION NOTES
1. ONE OF THE METHODS THAT FOLLOWS SHALL BE USED TO DETERMINE THE RATINGS OF
BUSBARS AND PANELBOARDS. (a) THE SUM OF 125 PERCENT OF THE INVERTER(S) OUTPUT
CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE
BUSBAR SHALL NOT EXCEED THE AMPACITY OF THE BUS BAR. (b) WHERE TWO SOURCES,
ONE THE UTILITY AND THE OTHER AN INVERTER ARE LOCATED AT OPPOSITE ENDS OF A
BUSBAR THAT CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE INVERTER(S) OUTPUT
CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE
BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR [NEC 705.121.
PV Production meter notes:
1. The self-contained metering will be in compliance
with the most recent revision of the Xcel
Energy Standard; specifically Section 4.11.
2. The PV production meter will be required to have
the PV generation wired to the line side terminals
(top of meter block).
3. The meter socket for the PV production meter shall
be marked with a stamped brass, aluminum, or
stainless steel tag, indicating the address including
the unit, typically "PV PROD" in accordance with
the requirements for "Meter Identification" in Section
4.14.4 of the Xcel Energy Standard.
4. The PV production meter shall be located within
ten (10) feet of the existing utility meter. If there
is any reason this cannot be accomplished, a site
plan showing proposed equipment locations
shall be submitted for review. The local meter
shop must approve the site plan for application
approval; site meetings can be arranged upon
request.
NOTE TO INSTALLER: The current Placard that we require
at the utility meter and AC Disconnect is a yellow with black
lettering
1403 N RESEARCH WAY, BUILDING J
OREI'A, UT 84097
800-377-4480
VWAN.BLUE RAVENSOLAR.COM
CONFIDENTIAL. -THE INFORMATION
HEREIN CONTAINED SHALL NOT BE.
USED FOR THE BENEFIT OF
ANYONE EXCEPT
BLUERAVENSOLAR NOR SHALL IT
BE DISCLOSED IN WHOLE OR IN
PART TO OTHERS OUTSIDE
RECIPIENTS ORGANIZATION,
EXCEPT IN CONNEC TION WITH THE
SALE AND USE OF THE RESPECTIVE
EQUIPMENT,V,IITHOU€ THE
WRITTEN PERMISSION OF
BLUERAVENSOLAR LLC.
ACED
CERTIFIED
PV INSTALLATION
PROFESSIONAL
Scott Gurney
# PV -011719-015866
CONTRACTOR:
BRS FIELD OPS
385.498.6700
p •
�
i
••
i
i
i!
i
i
i.:
•
,, ,
t
•
-
CO
co
DRAINING BY
Kate Petersen
DATE
June 5, 2019
PRO.E.,CT
r
62537179
SHEET NAME
ELEC. 3 LINE DIAD.
GE Nur�eEN �:_'✓ISlcra
�• PV5 0
MODULE SPECIFICATIONS Trinasolar3UU ISM UUUbA.US(ll
RATED POWER (STC)
300 W
MODULE VOC
40 V DC
MODULE VMP
33 V DC
MODULE IMP
9.2 A DC
MODULE ISC
9.8 A DC
VOC CORRECTION (%/'C)
-0.3 °C
VMP CORRECTION (%f°C)
-0.4 °C
SERIES FUSE RATING
15 A DC
ADJ. MODULE VOC @ ASHRAE LOW TEMP
44.3 V DC
ADJ. MODULE VMP @ ASHRAE 2% AVG. HIGH TEMP
27.5 V DC
MICROINVERTER SPECIFICAI IONS
EnphaseIQ/-bU-Z-US
POWER POINTTRACKING(MPPT) MINIMAX
22 - 48 V DC
MAXIMUM INPUTVOLTAGE
48 V DC
MAXIMUM DC SHORT CIRCUIT CURRENT
15 A DC
MAXIMUM USABLE DC INPUT POWER
350 W
MAXIMUM OUTPUT CURRENT
1 AAC
AC OVERCURRENT PROTECTION
20 A
MAXIMUM OUTPUT POWER
240 W
CEC WEIGHTED EFFICIENCY
97%
AC PHUIOVULA I IC MUUULE MARKINU (NEC b`!l.SZ)
NOMINAL OPERATING AC VOLTAGE
240 V AC
NOMINALOPERATING AC FREQUENCY
47- 68 HZAC
MAXIMUM AC POWER
240 VA AC
MAXIMUM AC CURRENT
1.0 A AC
MAXIMUM OCPD RATING FOR AC MODULE
20 A AC
DESIGN LOCATION ANDTEMPERATURES
TEMPERATURE DATA SOURCE ASHRAE 2% AVG. HIGH TEMP
STATE Colorado
CITY Wheat Ridge
WEATHER STATION SALISBURY WICOMICO CO AP
ASHRAE EXTREME LOW TEMP (°C) -14
ASHRAE 2% AVG. HIGH TEMP ('C) 33
SYSTFM FI FCTRICAI gPFCIFICATjnN,; CIR 1 CIR? CIR 3 CIR 4 CIR S CIR 6
NUMBER OF MODULES PER MPPT
DC POWER RATING PER CIRCUIT (STC)
TOTAL MODULE NUMBER
STC RATING OF ARRAY
AC CURRENT @ MAX POWER POINT (IMP
MAX. CURRENT (IMP X 1.25)
OCPD CURRENT RATING PER CIRCUIT
MAX. COMB. ARRAY ACCURRENT (IMP)
MAX. ARRAY AC POWER
16
4800
VRISE(V) VEND(V)
%VRISE IQ7-8
VRISE SEC. 1(MICRO TO JBOX)
28.8
0.93 240.93
16 MODULES
480OW DC
16.0
2D
20
2.03 242.03
0.85%
VRISE SEC. 3 (COMBINER BOX TO POI)
5
0.20 240.20
16.0
3840W AC
AC VOLTAGE RISE CALCULATIONS
DIST (FT)
VRISE(V) VEND(V)
%VRISE IQ7-8
VRISE SEC. 1(MICRO TO JBOX)
28.8
0.93 240.93
0.39%
VRISE SEC, 2 (JBOX TO COMBINER BOX)
50
2.03 242.03
0.85%
VRISE SEC. 3 (COMBINER BOX TO POI)
5
0.20 240.20
0.08%
TOTAL V RISE
AMB. TEMP. AMP. CORRECTION =
0.96
1.32%
PHOTOVOLTAIC AC DISCONNECT OUTPUT LABEL (NEC 690.54)
AC OUTPUT CURRENT 16.0 A AC
NOMINAL AC VOLTAGE 240 V AC
GROUNDING NOTES
1. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH [NEC 69047] AND
[NEC 250-501 THROUGH [NEC 250-601 SHALL BE PROVIDED. PER NEC,
GROUNDING ELECTRODE SYSTEM OF EXISTING BUILDING MAY BE USED AND
BONDED TO AT THE SERVICE ENTRANCE, IF EXISTING SYSTEM IS INACCESSIBLE,
OR INADEQUATE, OR IS ONLY METALLIC WATER PIPING, A SUPPLEMENTAL
GROUNDING ELECTRODE WILL BE USED AT THE INVERTER LOCATION
CONSISTING OF A UL LISTED 8 FT GROUND ROD WITH ACORN CLAMP.
2, THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL
DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL (OR INVERTER) IF
SMALLER THAN #6 AWG COPPER WIRE PER NEC 250-64B. THE GROUNDING ELECTRODE
CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS AT BUSBARS
WITHIN LISTED EQUIPMENT PER [NEC 250.640.1.
3. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN #8 AWG AND
NO GREATER THAN #6 AWG COPPER AND BONDED TO THE EXISTING GROUNDING
ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM.
4. PV SYSTEM SHALL BE GROUNDED IN ACCORDANCE TO [NEC 250.211, [NEC TABLE
250.1221, AND ALL METAL PARTS OR MODULE FRAMES ACCORDING TO [NEC
690.46].
5. MODULE SOURCE CIRCUITS SHALL BE GROUNDED IN ACCORDANCE TO [NEC
690.421.
6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT
THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDED CONDUCTOR
TO ANOTHER MODULE.
7. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTIONS POINTS
IDENTIFIED IN THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
8. ENCLOSURES SHALL BE PROPERLY PREPARED WITH REMOVAL OF PAINT/FINISH
AS APPROPRIATE WHEN GROUNDING EQUIPMENT WITH TERMINATION
GROUNDING LUGS.
9. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND
GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR DIRECT BURIAL
10. GROUNDING AND BONDING CONDUCTORS SHALL BE COPPER, SOLID OR
STRANDED, AND BARE WHEN EXPOSED.
11. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZE ACCORDING TO [NEC
690.451 AND BEA MINIMUM OF #10AWG WHEN NOT EXPOSED TO DAMAGE (#6AWG
SHALL BE USED WHEN EXPOSED TO DAMAGE),
12, GROUNDING AND BONDING CONDUCTORS, IF INSULATED. SHALL BE COLOR
CODED GREEN (OR MARKED GREEN IF #4 AWG OR LARGER)
13, ALL CONDUIT BETWEEN THE UTILITY AC DISCONNECT AND THE POINT OF
CONNECTION SHALL HAVE GROUNDED BUSHINGS AT BOTH ENDS.
14, SYSTEM GEC SIZED ACCORDING TO [NEC 690.471. [NEC TABLE 250.661, DC
SYSTEM GEC SIZED ACCORDING TO [NEC 250.1661, MINIMUM #8AWG WHEN
INSULATED. #6A'AIG WHEN EXPOSED TO DAMAGE.
15. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES,
EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED IN
ACCORDANCE WITH 250.134 OR 250.136(A) REGARDLESS OF VOLTAGE,
WIRING & CONDUIT NOTES
1. ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS PURPOSE AND
APPROVED FOR THE SITE APPLICATIONS
2. BOLTED CONNECTION REQUIRED IN DC DISCONNECTS ON THE WHITE GROUNDED
CONDUCTOR (USE POLARIS BLOCK OR NEUTRAL BAR)
3. ANY CONNECTION ABOVE LIVE PARTS MUST BE WATERTIGHT. REDUCING WASHERS
DISALLOWED ABOVE LIVE PARTS, MEYERS HUBS RECOMMENDED
4. UV RESISTANT CABLE TIES(NOT ZIP TIES) USED FOR PERMANENT WIRE MANAGEMENT
OFF THE ROOF SURFACE IN ACCORDANCE WITH NEC 110.2,110.3(A -B), 300.4
5. SOLADECK JUNCTION BOXES MOUNTED FLUSH \N/ROOF SURFACE TO BE USED FOR
V"DIRE MANAGEMENT AND AS FLASHED ROOF PENETRATIONS FOR INTERIOR CONDUIT
RUNS.
6. ALL PV CABLES AND HOMERUN WIRES BE TYPE USE -2, AND SINGLE -CONDUCTOR
CABLE LISTED AND IDENTIFIED AS PV WIRE, TYPE TC -Eft, OR EQUIVALENT; ROUTED TO
SOURCE CIRCUIT COMBINER BOXES AS REQUIRED
7. ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED ACCORDING TO [NEC
CONDUCTOR SIZE CALCULATIONS
MICROINVERTERTO
MAX. SHORT CIRCUIT CURRRENT (ISC) =
16.0 AAC
JUNCTION BOX (1)
MAX. CURRENT (ISC X1.25) =
20.0 A AC
f
CONDUCTOR (TC -ER, COPPER (90°C)) =
12 AWG
CONDUCTOR RATING =
30 A
AMB. TEMP. AMP. CORRECTION =
0.96
-14
ADJUSTED AMP. =
28.8 >
20.0
JUNCTION BOXTO
MAX. SHORT CIRCUIT CURRRENT (ISC) =
16.0 AAC
>
JUNCTION BOX (2)
MAX. CURRENT (ISC X1.25) =
20.0 A AC
0
CONDUCTOR (UF -B, COPPER (60°C)) =
10 AWG
CON DUCTO R RATING =
30A
N
Q
CONDUIT FILL DEBATE =
1
0
AMB. TEMP. AMP. CORRECTION =
0.96
ADJUSTED AMP. =
28.8 >
20.0
JUNCTION BOX TO
MAX. SHORT CIRCUIT CURRRENT(ISC) =
16.0 AAC
p
COMBINER BOX (3)
MAX. CURRENT (ISC X1.25) =
20.0 A AC
LiJ
z
CONDUCTOR (UF -B, COPPER (60°C)) =
10 AWG
W
CONDUCTOR RATING=
30 A
(/}
,
CONDUIT FILL DERATE=
1
AMB. TEMP. AMP. CORRECTION =
0.96
ADJUSTED AMP. =
28.8 >
20,0
COMBINER BOX TO
INVERTER RATED AMPS =
16.0 A AC
MAIN PV OCPD (15)
MAX. CURRENT (RATED AMPS X1.25) =
20 A AC
CONDUCTOR (THWN-2, COPPER (75-C TERM.)) =
10 AWG
Kate Petersen
CON DUCTO R RATING =
35A
CONDUIT FILL DERATE =
1
AMB. TEMP. AMP. CORRECTION =
0.96
ADJUSTED AMP. =
33.6 >
20.0
690.81 FOR MULTIPLE CONDUCTORS
8. ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE INSTALLED
AT LEAST 7/8" ABOVE THE ROOF SURFACE AND DERATED ACCORDING TO [NEC TABLE
310.15 (B)(2)(a), NEC TABLE 310.15(13)(3)(a),& NEC 310.15(13)(3)(C)].
9. EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE -2. 90°C RATED, WET AND UV
RESISTANT, AND UL LISTED RATED FOR 600V, UV RATED SPIRAL WRAP SHALL BE
USED TO PROTECT WIRE FROM SHARP EDGES
10. PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHNITHWN-2
INSULATED, 90°C RATED, WET AND UV RESISTANT, RATED FOR 600V
11. 4 -WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER
VOLTAGE TO GROUND MARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE MEANS.
12. ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION
13. VOLTAGE DROP LIMITED TO 2% FOR DC CIRCUITS AND 30i, FOR AC CIRCUITS
14. NEGATIVE GROUNDED SYSTEMS DC CONDUCTORS SHALL BE COLOR CODED AS
FOLLOW& DC POSITIVE- RED (OR MARKED RED), DC NEGATIVE- GREY (OR MARKED GREY)
15. POSITIVE GROUNDED SYSTEMS DC CONDUCTORS COLOR CODED:
DC POSITIVE- GREY (OR MARKED GREY), DC NEGATIVE- BLACK (OR MARKED BLAOg y
16. AC CONDUCTORS >4AWG COLOR CODED OR MARKED:
PHASE A OR L1- BLACK, PHASE B OR L2- RED, PHASE C OR L3- BLUE. NEUTRAL- ; hepr Rid3e
WHITE/GRAY
USE -2 IS NOT INDOOR RATED BUT PV CABLE IS RATED THWN/THV"•IN-2 AND MAY
BE USED INSIDE
- USE -2 IS AVAILABLE AS UV WHITE
17. RIGID CONDUIT, IF INSTALLED, (AND/OR NIPPLES) MUST HAVE A PULL BUSHING
PROTECT WIRES.
18. IF CONDUIT DETERMINED TO BE RAN THROUGH ATTIC IN FIELD THEN CONDUIT ILL
BE EITHER EMT, FMC, OR MC CABLE IF DC CURRENT COMPLYING WITH NEC 690.31, NEC
250.118(10). DISCONNECTING MEANS SHALL COMPLY WITH 690.13 AND 690.15
19. CONDUIT RAN THROUGH ATTIC WILL BE AT LEAST 18" BELOW ROOF SURFACE
COMPLYING WITH NEC 230.6(4) AND SECURED NO GREATER THAN 6' APART PER NEC
330.30(13).
BLUE RAVEN
140314 RESEARCH WAY; BUILDING J
OREM, UT 84097
800-377-4480
%fvW, d.BLUERAVENSOLAR.00M
CONFIDENTIAL. -THE INFORMATION
HEREIN CONTAINED SHALL NOT BE.
USED FOR THE BENEFIT OF
ANYONE EXCEPT
BLUERAVENSOL.AR NOR SHALL IT
BE DISCLOSED IN WHOLE OR IN
PART TO OTHERS OUTSIDE
RECIPIENTS ORGANIZATION,
EXCEPT IN CONNEC TION'V41TH THE
SALE AND USE OF THE RESPECTIVE
EQUIPMENT, WITHOUT THE
WRITTEN PERIv11SSION OF
BLUERAVENSOLAR LLC.
ACED
CERTIFIED
PV INSTALLATION
PROFESSIONAL
Scott Gurney
# PV -011719-015866
CONTRACTOR:
BRS FIELD OPS
385.498.6700
A1'1fiT�•`�GIl7tIS]
PRO JE T N::'.13ER
62537179
SHEET NA%IE
ELEC. CALLS.
PAGE NUMBER REVOON
PVE3 0
f
-a
000
-14
m
O
00
Z
>
0
0
°
L1i
m
N
Q
0
2Ui
p
--
i
LiJ
z
W
(/}
,
>_
(D
U)
r
®
U)
00
n
DRAINING BY
Kate Petersen
A1'1fiT�•`�GIl7tIS]
PRO JE T N::'.13ER
62537179
SHEET NA%IE
ELEC. CALLS.
PAGE NUMBER REVOON
PVE3 0
E-11 Mw�
ELECTRIC SHOCK HAZARD
TERMINALS ON THE LINE AND
LOAD SIDES MAY BE ENERGIZED
— IN THE OPEN POSITION -
DIRECT CURRENT
MAXIMUM VOLTAGE VDC
MAX CIRCUIT CURRENT AMPS
RATED AC OUTPUT CURRENT A
Op
NOMINAL OPERATING AC VOLTAGE V
777,77777,
0
7A
DUAL POWER SUPPLY j
SOURCES: UTILITY GRID AND
RV SOLAR ELECTRIC SYSTEM
&WARNING..,",
INVERTER OUTPUT CONNECTION]
DO NOT RELOCATE
THIS OVERCURRENT
DEVICE
THIS EQUIPIVIENT FED BY MULTIPLE
SOURCES. TOTAL RATING OF ALL
OVERCURRENT DEVICES. EXCLUDING
MAIN SUPPLY OVERCURRENT
DEVICE SHALL NOT EXCEED
AMPACITY OF BUSBAR.
PHOTOVOLTAIC
SYSTEM CONNECTED
PV AC DISCONNECT
LABEL 1
FOR PV DISCONNECTING MEANSA'HERE ALL
TERMINALS OF THE DISCONNECTING MEANS
MAY BE ENERGIZED IN THE OPEN POSITION.
[NEC 690.13(6). NEC 705.22]
LABEL 2
AT EACH DC DISCONNECTING MEANS,
INCLUDING THE DC DISCONNECT AT THE
INVERTER.
[NEC 690.53. NEC 690.13(B)]
LABEL
AT POINT OF INTERCONNECTION, MARKED AT
AC DISCONNECTING MEANS.
[NEC 690.54, NEC 690,13 (B)]
LABEL 4
AT POINT OF INTERCONNECTION FOR
EQUIPMENT CONTAINING OVERCURRENT
DEVICES IN CIRCUTS SUPPLYING POWER TO A
BUSBAR OR CONDUCTOR SUPPLIED FORM
MULTIPLE SOURCES, EACH SERVICE
EQUIPMENT AND ALL ELECTRIC POWER
PRODUCTION SOURCE LOCATIONS. [NEC
705,12(B)(3)1
LABEL
PLACED ADJACENT TO THE BACK -FED BREAKER
FROM THE INVERTER IF TIE IN CONSISTS OF
LOAD SIDE CONNECTION TO BUSBAR.
[NEC 705.12(B)(2)(3)(b)j
LABEL 6
(ONLY IF 3 OR MORE SUPPLY SOURCES TO
A BUSBAR)
SIGN LOCATED AT LOAD CENTER IF IT
CONTAINS 3 OR MORE POWER SOURCES.
[NEC 7D512(B)(2)(3)(C)]
LABEL 10
SIGN LOCATED AT RAPID SHUT DOWN
DISCONNECT SWITCH (NEC 690.56(C)(3)].
LABEL 12
PLACARD TO BE PLACED AT THE MAIN
BILLING METER PER XCEL ENERGY,
LABEL 13
PLACARD TO BE PLACED AT AC
DISCONNECT PER XCEL ENERGY.
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAF913 SHUTDOWN
SWITCH TOTHE
'OFr POSITION TO aNrrx
SHUT DOWN PV SYSTEM eanas
AND REDUCE
SHOCK HAZARD
IN THEARRAY
LABELING NOTES:
t LABELS CALLED OUT ACCORDING TO ,ALL
L COMMON CONFIGURATIONS ELECTRICIAN TO
DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND
MAKE APPROPRIATE ADJUSTMENTS.
2. LABELING REQUIREMENTS BASED ON THE 2017 NATIONAL ELECTRIC CODE, OSHA STANDARD
19010.145, ANSI 2535.
3. MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION.
4. LABELS TO BE OF SUFFICIENT DURABILITY TO',,MTHSTAND THE ENVIRONMENT INVOLVED [NEC
110.211:
5. LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8". WHITE ON RED BACKGROUND: REFLECTIVE,
AND PERMANENTLY AFFIXED [IFC 605.11.1.1]
RAPID SHUTDOWN TEST
NOT REQUIRED
LABEL
AT DIRECT-CURRENT EXPOSED RACEWAYS, CABLE TRAYS, COVERS AND ENCLOSURES OF
JUNCTION BOXES. AND OTHER WIRING METHODS; SPACED AT MAXIMUM LOFT SECTION OR
WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS.
[NEC 690.31(G)(334')]
LABELS
FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY
AND CONDUCTORS LEAVING THE ARRAY
SIGN TO BE LOCATED ON OR NO MORE THAN 3
FTAWAY FROM SERVICE DISCONNECTING
MEANS TO WHICH THE PV SYSTEMS ARE
CONNECTED AND SHALL INDICATE THE
LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN
SWITCHES IF NOT AT THE SAME LOCATION.
[NEC 690.56(C}(1)(A)j
LABEL 9
FOR PV SYSTEMS THAT ONLY SHUT DOWN
CONDUCTORS LEAVING THE ARRAY
SIGN TO BE LOCATED ON OR NO MORE THAN 3
FT AAIAY FROM SERVICE DISCONNECTING
MEANS TO WHICH THE PV SYSTEMS ARE
CONNECTED AND SHALL INDICATE THE
LOCATION OF ALL IDENTIFIED RAPID SHUTDO',j',N
SWITCHES IF NOT AT THE SAME LOCATION.
[NEC 690.56(C)(1)(B)]
LABEL 11
SIGN LOCATED AT AC COMBINER BOX FOR
ALL MICRO -INVERTER I AC MODULE
INSTALLS (IF APPLICABLE).
LABELING DIAGRAM FOR MICRO INV.:
MAIN SERVICE PANEL
LABEL 15
&W" PERMANENT DIRECTORY TO BE LOCATED AT
MAIN SERVICE EQUIPMENT LOCATION IF ALL
MAIN DISTRIBUTION UTILITY DISCONNECT(S) ELECTRICAL POWER SOURCE DISCONNECTING
POWGRTOTHIS BUILDING IS ALSOSUPPUED
FROM A ROOF MOUNTED SOLAR ARRAY WITH MEANS (SOLAR ARRAY RAPID SHUTDOWN
A RAPID SHUTDOWN DISCONNECTING MEANS SWITCH) ARE GROUPED AND IN LINE OF SITE OF
GROUPED AND LABELED WITHIN LINE OF SITE MAIN SERVICE DISCONNECTING MEANS.
AND la Fr OF THIS LOCATION. [NEC 690.56(C) & NEC 705.10].
AWARMING i
POWER TO THIS BUILDING IS ALSO
SUPPLIED FROM MAIN DISTRIBUTION
UTILITY DISCONNECT LOCATED
&WARNING
POWER TO THIS BUILDING IS ALSO SUPPLIED
FROM ROOF MOUNTED SOLARARRAY. SOLAR
ARRAY RAPID SHUTDOWN DISCONNECT IS
LOCATED OUTSIDE NEXT TO UTILITY METER.
LABEL 16
PERMANENT DIRECTORY TO BE LOCATED AT
SOLAR ARRAY RAPID SHUTDOWN SWITCH
DENOTING THE LOCATION OF THE SERVICE
EQUIPMENT LOCATION IF SOLAR ARRAY RAPID
SHUT DOWN DISCONNECT SWITCH IS NOT
GROUPED AND WITHIN LINE OF SITE OF MAIN
DISCONNECTING MEANS,
[NEC 705.10]
LABEL 17
PERMANENT DIRECTORY TO BE LOCATED AT MAIN
SERVICE EQUIPMENT DENOTING THE LOCATION
OF THE PV RAPID SHUTDOWN SYSTEM
DISCONNECTING MEANS IF SOLAR ARRAY RAPID
SHUT DOWN DISCONNECT SWITCH IS NOT
GROUPED AND WITHIN LINE OF SITE OF MAIN
SERVICE DISCONNECTING MEANS. [NEC 705.10,
NEC 690.56(C)(1)]
EXISTING SUB PANEL PV COMBINER
(IF bNHERE POINT OF' SUBPANEL-
NTERCONNECTION AC DISCONNECT IF: USED TO COMBINE AD JUNCTION BOX
S MADE) (IF REQ. / INSTALLED) PV OUTPUT CIRCUITS OR AC COMBINER BOX
@ IS U4
U3 & LJ 0
IF BREAKER USE
LABELING DIAGRAM FOR STRING INV- / DO OPTIMIZER INV:
MAIN SERVICE PANEL
(D 13
12
13
INVERTER
U3
IF BREAKER USED
'IF%NHERE POINT OF SUBPANEL -
R15 0 Rn17
INTERCONNECTION
OR PLA�_ARD
IF USED TO COMBINE
/7N
(ONLY IF PV
IS MADE)
INTERCONNECTIOIN
PV OUTPUT CIRCUITS
CONSISTS OF LOA[
SIDE BREAKER)
LABEL 15
&W" PERMANENT DIRECTORY TO BE LOCATED AT
MAIN SERVICE EQUIPMENT LOCATION IF ALL
MAIN DISTRIBUTION UTILITY DISCONNECT(S) ELECTRICAL POWER SOURCE DISCONNECTING
POWGRTOTHIS BUILDING IS ALSOSUPPUED
FROM A ROOF MOUNTED SOLAR ARRAY WITH MEANS (SOLAR ARRAY RAPID SHUTDOWN
A RAPID SHUTDOWN DISCONNECTING MEANS SWITCH) ARE GROUPED AND IN LINE OF SITE OF
GROUPED AND LABELED WITHIN LINE OF SITE MAIN SERVICE DISCONNECTING MEANS.
AND la Fr OF THIS LOCATION. [NEC 690.56(C) & NEC 705.10].
AWARMING i
POWER TO THIS BUILDING IS ALSO
SUPPLIED FROM MAIN DISTRIBUTION
UTILITY DISCONNECT LOCATED
&WARNING
POWER TO THIS BUILDING IS ALSO SUPPLIED
FROM ROOF MOUNTED SOLARARRAY. SOLAR
ARRAY RAPID SHUTDOWN DISCONNECT IS
LOCATED OUTSIDE NEXT TO UTILITY METER.
LABEL 16
PERMANENT DIRECTORY TO BE LOCATED AT
SOLAR ARRAY RAPID SHUTDOWN SWITCH
DENOTING THE LOCATION OF THE SERVICE
EQUIPMENT LOCATION IF SOLAR ARRAY RAPID
SHUT DOWN DISCONNECT SWITCH IS NOT
GROUPED AND WITHIN LINE OF SITE OF MAIN
DISCONNECTING MEANS,
[NEC 705.10]
LABEL 17
PERMANENT DIRECTORY TO BE LOCATED AT MAIN
SERVICE EQUIPMENT DENOTING THE LOCATION
OF THE PV RAPID SHUTDOWN SYSTEM
DISCONNECTING MEANS IF SOLAR ARRAY RAPID
SHUT DOWN DISCONNECT SWITCH IS NOT
GROUPED AND WITHIN LINE OF SITE OF MAIN
SERVICE DISCONNECTING MEANS. [NEC 705.10,
NEC 690.56(C)(1)]
EXISTING SUB PANEL PV COMBINER
(IF bNHERE POINT OF' SUBPANEL-
NTERCONNECTION AC DISCONNECT IF: USED TO COMBINE AD JUNCTION BOX
S MADE) (IF REQ. / INSTALLED) PV OUTPUT CIRCUITS OR AC COMBINER BOX
@ IS U4
U3 & LJ 0
IF BREAKER USE
LABELING DIAGRAM FOR STRING INV- / DO OPTIMIZER INV:
MAIN SERVICE PANEL
EXISTING SUB PANEL
(D 13
a
INVERTER
U3
'IF%NHERE POINT OF SUBPANEL -
IF BREAKER USED
INTERCONNECTION
0 R 90
IF USED TO COMBINE
15 OR 17
OR P ARD
5
IS MADE)
(ONLY IF PV
PV OUTPUT CIRCUITS
INTERCONNECTIOP
CONSISTS OF LOA[
m
SIDE BREAKER)
EXISTING SUB PANEL
PV COMBINER
INVERTER
(S)
'IF%NHERE POINT OF SUBPANEL -
0
INTERCONNECTION
AC DISCONNECT
IF USED TO COMBINE
CV0
IS MADE)
(IF REQ. I INSTALLED)
PV OUTPUT CIRCUITS
_Y
m
(D O
0
>
IF BREAKER USE[
(D
n16
E9
0
-5
(ONLY IF PV
INTERCONNECTION
CONSISTS OF: LOAD
0
CO
0
SIDE BREAKER)
0
DC DISCONNECT
INTEGRATED
Citi OI
Vjt,00j iWidgG
di . ision
JUNCI ION BOX
QR CO€v1BiNEP. BOX
*ELECTRICAL DIAGRAMS SHO'AN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS
PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD, AND LOCATION PRESENTED ON PV5 OF 3 LINE DIAGRAM. PV5 LINE DIAGRAM TO REFLECT ACTUAL
REPRESENTATION OF PROPOSED SCOPE OF WORK.
Nom.
BLUE RAVEN
1403 N RESEARCH WAY, BUILDING J
OREM, UT 84097
800-377-4480
%AAA,lAl. BLUE RAVE NSOLAR, C OM
CONFIDENTIAL. -THE INFORMATION
HEREIN CONTAINED SHALL NOT BE
USED FOR THE BENEFIT OF
ANYONE EXCEPT
BLUERAVENSOLAR NOR SHALL IT
BE DISCLOSED IN'AfHOLE OR IN
PART TO OTHERS OUTSIDE
RECIPIENTS ORGANIZATION,
EXCEPT IN CONNEC TION',,,'ITH THE
SALE AND USE OF THE RESPECTIVE
EQUIPI'v1ENTIA11THOUT THE
WRITTEN PERMISSION OF
BLUERAVENSOLAR LLC.
NASCEP
CERTIFIED
PV INSTALLATION
PROFESSIONAL
Scott Gurney
# PV -011719-015866
CONTRACTOR:
EIRS FIELD OPS
385.498.6700
DATE
Line 5, 2019
PROJECT NUN'16FR
62537179
SHEET NAME
LABELS
PAGE NUMBER, REVISION
PV8 0
0
CV0
-0
CC)
_Y
m
0
00
>
0
-5
0
CO
0
N
0
U)
Cr
CD
0
Lli
U_
<
LU
IT—
U)
F_
.0
0
0
0
U)
C0
m
❑
DRAWING
BY
Kate
Petersen
DATE
Line 5, 2019
PROJECT NUN'16FR
62537179
SHEET NAME
LABELS
PAGE NUMBER, REVISION
PV8 0
r ZaTa S r , � -'
Enphase .Microzinve rters
Per4`on AIVERCAS
Enphase
IQ 7 and IQ 7+
W
L
To team rr, ore about Enphase ofrerings, visit entphasexomi
Tice high-powered smart grid-feady
Enphase IQ 7 Micro— and Enphase IQ 7+ Nlici-c-
dram.atica 114y simpl ify tne in sta I lefio In process while
achieving the highest system efficiency -
Part of the Enphase IQ, System, the 10 7 and
IQ 7+ Microinverters integrate with the Enpt?ase
IQ Envoy—., Enphase IQ Battery-, and the Enphase
Enl'ghter.- monitoring and analysis software.
IQ Series Microinverters extend the reliability
standards set forth by previous generations and
Undergo over a million hours of power -on testing,
enabling Enphase to provide an inclustry-leading
warranty of up to 25 years.
Easy to Install
Llghtw*ight and simple
Faster instalation cabling
Duitlirralpidl shutdown cr--.-np liart- (NEC 201A & 2017)
FEM119RIMMITIARMITF MMI
Optimized for high powered 60-celil and 742-cell"rrfodules
More than a rrillion hours of testim
• Class N
UL listed
• Cornp[ieswith advanced grid support voltage and
fteqjen--y ride-thrOUgh re1:?UjFerr0eits
• Pernotely updates to respond tochansir
g
grid requirenwnts
• Configurable for Varying grid profiles
MieetsCAFule2l (UL1741-SA)
'ThalQ 7- Mlceonreujuvdio supper, 72 -veli rnordulev.
ENPHASE.
Enphase IQ 7 and IQ 7+ Microinverters
INPUT DATA (DC)
IQ7-60-2-US I IQ7-60-B-I.JS
IQ7PLUS-72-2-US I IQ7PLUS-72-B-US
Commonlyn_aed module pairings'
235W-350 %+
235tH -444W+
Module compatibility
60 -cell PV modules only
60 -cell and 72 -cell PV modules
Maximurn input DC voltage
48 v
60V
Peak power tracking voltage
27 V - 37 V
27V -45V
Operating ra nge
16 V- 4.8 V
16V -60V
Min/Max start voltage
22V/48V
22 V/ 60 V
Max DC short circuit current module Ise)
15A
15A
Overvoltage class DC port
11
11
DC port backfeed current
0 A
0 A
PV array configuration
1 x 1 ungrounded array; No additional DC side, protection required,
,AC side protection requires max 20A per branch circuit
i2LUE RAVEN
1403 N RESEARCH WAY, BUILDING J
OREM, UT 84097
800-377-4480
VVk1'AAf.BLUERAVENSOLAR.COM
CONFIDENTIAL -THE INFORMATION
HEREIN CONTAINED SHALL NOT BE
USED FOR THE BENEFIT OF
ANYONE EXCEPT BLUE RAVEN
SOLAR NOR SHALL IT BE
DISCLOSED IN WHOLE OR IN PART
TO OTHERS OUTSIDE RECIPIENTS
ORGANIZATION, EXCEPT IN
CONNECTION WITH THE SALE AND
USE OF THE RESPECTIVE
EQUIPMENT, WITHOUT THE
WRITTEN PERMISSION OF BLUE
RAVEN SOLAR LLC.
—- — - — --------------- -- -- —
Peak output Power
---- — -
250 VA 295 VA
Maximum continuous output power
240 VA 290 VA
NABCEP
Nominal (L -L) voltage/range2
240 V / 208v/ 240 V / 208 V!
211-264V 183-229V 211,264V 183-2-19 V
CERTIFIED
Maximum continuous output current
1.0 A (240 V) 115 A (208 V) 1.21 A (240 V) 139 A (208 V)
Nominal frequency
60 Hz 66 Hz
PV INSTALLATION
Extended frequency range
47 -68 Hz 47-68 Hz
PROFESSIONAL
AC short circuit fault current over 3 cycles
5.8 Arms 5.8 Arms
Scott Gurney
Maximum units per 20 A (L -L) branch circuit;
16 (240 VAC) 13 (208 VAC) 13 (240 VAC) 11 (208 VAC)
# PV -011719-015866
Overvoltage class AC port
III III
CONTRACTOR:
AC port backfeed current
0 A 0 A
BRS FIELD OPS
Power factor setting
1.0 1.0
Power factor Odjustable)
0,7 leading 0.7 lagging 0.7 leading 0.7 lagging
385.498.6700
EFFICIENCY
@240 V @208 V @240 V @208 V
Pea k C k. `effi_ctency
97.6 IX 97,6 975'," _973"%
CEC weighted efficiency
97.0 % 97.0 is 97.0% 970
MECHANICAL DATA
Ambient temperature range
.. .. . .......
-40'C to +65°C
Relative humidity range
4% to 100%. (condensing)
Connectortype (IQ7-60-2-US & fQ77PLUS-72-2-US) MC4 kor Amphenol H4 UTX with additional Q -DCC -5 adapter)
Connector type (IQ7-60-8-US & 107PLUS-:72-B-US) Friends PV2 (MC4 intermateable).
Adaptors for modules with MC4 or UTX connectors:
PV2 to MC4: order ECA -S20 -S22
PV2 to UTX: order ECA -S20 -S25
Dimensions (WxHxD)
212 mm x M mm x 30.2 mm (without bracket)
Weight
1.08 kg (2.38 lbs)
Cooling
Natural convection - No fans
Approved for wet locations
Yes
Pollution degree
PD8
city of
Enclosure
Class 11 double -insulated, corrosion resistant polymeric enclosure
Environmental category UV exposur,- rating
NEMA Type 6 y�,Jdoor
RidgeFEATURES
wheat
LineCommunication(PLC)
Monitoring-
Enlighten Manager and MyEnlighten monitoring options.
ing Division
Both options require installation of an Enphase IQ Envoy.
Disconnecting means
The AC and DC connecters have been evaluated and approved by UL for use as the Icad-brew k.
disconnect required by NEC 690.
Compliance
CA Rule 21 (UL 1741 -SA)
UL 62109-1, UL1741,'IEEE1547, FCC Part 15 Class B, ICES -0003 Class 8,
CAN/CSA-C22.2 NO. 107.1-01
This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC -2014 and
NEC -2017 section 690.12 and 022.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC
and DC conductors, when installed according manufacturer's instructions.
- ----- ---- --------
1. Noenforced DC=ratio. See the cornpalb:11ty calculator at htip.,$,:Ilgnphase.c,.on/en-,uslsuppQrlI odle-
M mpaji I
Z Nominal vona ge range fan be exte nd e d bond no rn:nal if i e qu "red by the [1111
3. Jrnfls nay vary, Refer I o loc al requirements to de 1`1 ne the nurmer of mic.rorriverlers p_r branch in VoLl, area,
SHEET NAME
To learn more about Enphase offerings, visit enphase,com t:!k ENPHASE. SPEC SHEET
115 E.praseE cr-gi, I,- :,_-:r)ds ,,e:d arc tl,,e prox�rty of we
pl-,
201 &!"is 24 PAGE NUMBER REVISION
�M$
sl.phase Networking
Enphase
IQ Combiner
The Enphase ltd Combiner 3" w th Enphase
IQ Envoy' consolidates interconnection
equipment into a single enclosure and
streamlines PV and storage 'nsta at ons by
provid'ng a consistent, pre -wired so ut'on for
resident'aapplications. It o'fers up to four
2-po e input circuits and Eaton BR series
busbar assembly.
Smart
Includes IQ Envoy for communication
and control
Flexible networking supportswi-Fi,
1 Ethernet, or cellular
Optional AC receptacle available for PLC
bridge
Provides production metering and optional
consumption monitoring
V`
LISTED
To learn more about Enphase offerings, visit enphase.crrn
Simple
Reduced size from previous combiner
Centered mounting brackets support single
stud mounting
Supports back and side conduit entry
Up to four 2 -pole branch circuits for 240 VAC
plug-in breakers (not included)
80 A total PV or storage branch circuits
Reliable
Durable NRTL-certified NEi••11A type
3R enclosure
Five-year warranty
UL listed
AGE NUMBERI REVISION
SS 0
BLUE RAVEN
Enphase IQ Combiner
1403 N RESEARCH WAY, BUILDING J
OREM, UT 84097
MODEL NUMBER
_iQ
IQ Cornbiner3 X -IQ -AMI -240-3
C mb'ner 3 with Enphase IQ Envoy 'printed circuit board for integrated revenue grade PV
800-37711480
production metering (ANSI 012.20 +1- 0.5'!x) and optional* consumption monitoring (+f- 2.51k).
t,W W.BLUERAVENSOLAR.COM
ACCESSORIES and REPLACEMENT PARTS (not included, order separately)
CONFIDENTIAL -THE INFORMATION
Enphase Mobile Connect"
CELLMODEM-03 4G i 12 -year data San
� y R )
Plug and la Industrial rade cellular modem with data tan for stems a to 60
9 play g p y p
HEREIN CONTAINED SHALL NOT BE
USED FOR THE BENEFIT OF
CELLMODEM-01 (3G f 5 -year data plan)
microinverters. (Availablein the US, Canada, Mexico. Puerto Pico, and the US Virgin islands,
ANYONE EXCEPT BLUE RAVEN
CELLMODEM-M1 (4G based LTE -M f 5 -year data plan) where there is adequate cellular service in the installation area.)
SOLAR NOR SHALL IT BE
Consumption Monitoring" GT
DISCLOSED IN WHOLE OR IN PART
CT--200-SPLIT
Split core current transformers enable whole home consumption metering (+1- 2.5%).
TO OTHERS OUTSIDE RECIPIENTS
Circuit Breakers
Supports Eaton BR210, gR215, 88220, BR230, BR240, BR250, and BR260 circuit breakers.
ORGFlNIZAEXCEPT IN
ITH
CONNECTION WWITH THE SALE AND
6RK: 10A-2-240
Circuit breaker, 2pole, 10A, Eaton BR210
USE THE RESPECTIVE
BRK-15.4-2-240
Circuit breaker, 2 pole, 15A, Eaton BR215
EQUIPMENT, WITHOUT THE
BRK 20A -2P-240
Circuit breaker, 2pole, 20A, Eaton BR220
ITTE
WRITTEN PERMISSION OF BLUE
EPLC-01
Power line carrier (communication bridge pair), quantity 2
RAVEN SOLAR LLC.
XA-PLUG-120-3
Accessary receptacle for Power Line Carrier in IQ Combiner 3 (required for €PLC -01)
XA-ENV-PCBA-3
Replacement IQ Envoy printed circuit board (PCB) for Combiner 3
ELECTRICAL SPECIFICATIONS
CERTIFIED
Rating
Continuous duty
System voltage
1201240 VAC, 69 Hz
PV INSTALLATION
Eaton BR series busbar rating
125 A
PROFESSIONAL
Max. continuous current rating(output rid)
C P g
65 A
Scott Gurney
# PV -011 71 9-01 5866
Max, fusedcircult rating (output)
90A
CONTRACTOR:
Branch circuits (solar and/or storage)
Up to four 2 -pole Eaton B R series Distributed Generation (DG) breakers only (not included)
BRS FIELD OPS
Max. continuous current rating (input from PV)
64A
38
385.498.67Q0
Max total branch circuit breaker rating (input')
80A of distributed generation t 90A with IQ Envoy breaker included
Production Metering CT
20C A solid core pre-installed and wired to IQ Envoy
MECHANICAL DATA
Dimensions (WxHxD)
49 5x 375 16.8 cm (19.5" x 14.75"x 6 63") Height is 21 06(1_3 5 cin w I;h mounting b ackets)
Weight
7.5 kg (16.5 lbs.)
Ambient temperature range
-40° C to +46° C (-400 to 115° F)
Cooling
Natural convection, plus heal shield
Enclosure environmental rating
Outdoor, NRTL-certified, NEMA type 3R, polycarbonate construction
Wire sizes
20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors
60 A breaker branch input: 4 to 110 AWG copper conductors
Main lug combined output: 10 to 210 AING copper conductors
Neutral and ground: 14 to 110 copper conductors
Always follow local cede requirements for conductor sizing.
Alt, adv
To 2000 meters (6,560 feet)
INTERNET CONNECTION OPTIONS
Integrated Vvi-Fi
SG2IIbr'g,n H
G;ty of
Ethernet
Optional, 802.3, Cat5E (or Cat b) UTP Ethernet cable (not included)
Cellular
Optional, CELLMODEM-01 (3G} or CELLMCDEM-03 (4G) or CELLMODEM-M1 (4G based LTE -M)
yidge
,,not included)
1[SM� ,at
Division
COMPLIANCE
Compliance, Combiner
UL 1741
gull in9
CANICSA 022.2 No. 107.1
47 CFR, Part 15, Class B, ICES 003
Production metering. ANSI 012.20 accuracy class 0.5 (PV production)
Compliance, iQ Envoy
JUL 60601-1ICANCSA 22.2 No. 61010-1
* Consumption monitoring is required for Enphase Storage Syster ns.
To learn more about Enphase offerings, visit-enphase;cwn
Q 20 I - Mira ..El-'e-ar.Alnn t.>.cscn.ed.; i trad..m.,rlaerbrans-In this dcrarn..:are r.gi_•tcrc. ty taciir r-....r..-.p.aLar. �
?C f J -I,';
-
SHEET NAME
SPEC SHEET
AGE NUMBERI REVISION
SS 0
60 CELL
MONOCRYSTALLINE MODULE
275 -315W --
POWER OUTPUT RANGE
19.2%
MAXIMUM EFFICIENCY
Maximize limited space with top -end efficiency
-Up to 1CZlV,m,' riowerdensity
_._�.
• Low thel"ini'1 coefficients for ig.reat.i r ene €gy prcid ctiitol'1 at }'.Isgh
CtpP,. .inq "zemperat'. rPc
POSITIVE POWER TOLERANCE
Highly reliable due to stringent quality control
"O'r�r30in- ousott_-s .IV,Tt ICanGt1 'tymnre)
Fca6eEIn1957,T naStari5thewasicYS;flatGny
comp-ahenswe5olutionsprovider for solarener-4y_
• Inhouse testing goes I.0beyond Certif cxi.. i regUireennei tS
wa ilelE?„Wv' f<ti:iE. cSH7}}'.9ati{:?'i :Ni132 aUf part."1er515
• � {,:-Sistant
critical to success. Trina Sour now distributes ;t5
1001;,b ftdouble lns,pel-tki3F`
Pti product, to ovaM 60 countries al over the
world,-dria'sabl inprovideexcepbonaisei,dre
Selective emitter, adVanced5urface-texturing
toeach a tanner in each markaixidsupplerrent
our4111mauwe ra &.e orcidiuciswiththetacking
of Tnna is a5 iri g t+in4able "),uti7f r We are
committedtobftdi-Nstra`eo rout 3r
Certified to withstand. the most challenging
berwr6cilC Ilaboraticr, with irrtalfers
Ircll ntai conditions
d•stri .tcr>andLiheit..iftrK.S.
-
• 24(10 Pa wind load
_._... .-_.�
• S7C O I'a �riuwload
Comprebenst e Products
• 731 mm hall !:,!.ones at 97 klri/h
And S °st rn Certificates
iEC6121:r/iE?;fi17 P.it..17t13fiEC6I75,01 tELI,271n
rr1J9)01: Q'J' ty r4ai,a empm System -
60 VZO(M EnvironmentalmaagerrenS-yste,, n
n1aC•FA GrEa d-iCV5EQ3".+r'4F?fiSrX1S sYtiE3irN?
fi3i,4<, 1�T00 r {.;k, , u atttf arylSr':*t
LINEAR PERFORMANCE ARRANTY
10yetirpraductwarrante' 25 Year Linear Power Wanare y
--;:
War
;.�. worn
�mw'
t
ux, „
-
�_.µ. .........
,[
............. .. .. ........._.. .................... ..
Trmasue-,Iar
_. ._-...... _._._______...........
,
L 4, iYdtt•ti:'ti
f r.d .v's¢ ,1 ��: iv^ >t1ar)e(::. Y,.
' ) PLUS" FRAMED 60 -CELL MODULE
ULE
:I RAVEN
i
ipl - POINER RANGE ELECTRICAL, DATA (STC)
T5M DDQ5A QB(It) 2fl0 315-} 1403 N RESEARCH WAY, BUILDING J
TsM DDQ5R.Q5(Il) I 275 315 PeakPOWC1Watt, P»,y(W'pt* 275 280 295 29'0 295 30� 305 310 315 OREM UT 84097
PmwerGvtper;7n6eranrt�t'Y+x(4¢ Q" is 800-377-4420
V'W'AV.BLUERAVENSOLAR.COM
Maximum PoerVaiiage V lV) 31 4 317 31,d 32.2 32.5 32.6 32.9 33.1 ?3.3
MaximumPDlirmCurrc+nt-Iw (A) 875 FJ34 8,97 9.01 ' 9118 9.3(3 9.?8 937 9.46 CONFIDENTIAL - THE INFORMATION
HEREIN CONTAINED S€ -TALL NOT BE
Open Cirruit voitage•Vr" (v) BA _ €9,4 185 :I8.9 39.5 39.8 40..0 402 40.5 USED FOR THE BENEFIT OF
ANYONE EXCEPT BLUE RAVEN
Short circuit Current dsr(A) 9..24 9.42 9SI 9.66 6:68 9.77 9.45 9.94 10,0 SOLAR NOR SHALL IT BE
- MnrbriaFtfiri.?gryrp,(%) 16,3 771 17.4 17.7 URO 1611 186 18.9 1912 DISCLOSED IN V,tHOLE OR IN PART
TO OTHERS OUTSIDE RECIPIENTS
tcanaaeeaacv��r-�.GTe'rttr�:ue1=�.=r rtsFttts, ORGANIZATION, EXCEPT IN
kir*„• Tnie;rarluaera;sce:,
a CONNECTION WITH THE SALE AND
USE OF THE RESPECTIVE
ELECTRICAL DATA (NOCT) EOUIPMEN 1' VaITHOU TITHE
s "RIITEN PERMISSION OF BLUE
a NaxrmumPawer•Pw(wp) 205 209 212 216 220 273 227 231 235 RAVEN SOLAR LLC.
R �
t MaximumPiwaerYratage•VwT(t) 291 29.4 29.5 29.9 301 302 3(15 30.7 30.9
Maximum Power Current -I- (A) 7,04 7.14 7,21 7.24 7,30 7.3£3 7.46 753 7.b0 N9 E 3
Open Circuit VCha.3e-Vrx (4) 35.7 35.7 35.3 36.2 353 37.0 37.2 967.4 37 6
<,
Short ClreuiiCurrrsnt h: (A) 7.46 761 7�>3 �.�J 7.82 :7.89 7.c71956.03 8110CERTIFIED
PV INSTALLATION
c+x<ur _ N'rxF;lrc32nFlAti,.fW3n`,RYe,'.iPnCTPmjlf'2tlitP.("s'E. T7:n15M.E'b'^�
PROFESSIONAL
-'' Scott Gurney
ISE CH.ANIC,AI_ D ITA # PV -01 1719-015566
15ft i8 R93�i:1
Solarcells Monocry5tarrne156.75a156.15mrn(6tache5) CONTRACTOR:
Cell Orkontatan 60 celis(6 x10} BRS FIELD OPS
Module Dimensions Ib5D * 99Z .,,1Smm (65.0 x 391 * 1.38 mches} 385.49$.6700
Weight 19.6 kg (41 C Ib 1
Glass 3.2 min (0.13 inches), High Transmission, AR Coated Tempered Glass
Hacks#eet W'Itte €)D05A 08(li)It
Black l 5A,05(141
3s,•r_as. Frame Black Anodized AlucTi)niurn Aticy(D-IOSA.08(11),DC05R,05(1I)#
(A -A) I -Box 9P 67 or IP68:rated
Cables Phatovottai c Techr2o€ogy Cable 4,0 min' (0.006 inme5z),
I-vC1'"Rfs')F a r I1000mm(39Ainches)
Connector TrinaiS4
'O Eire Type Type 1 orlrype 2
5
u H
a r'
TEMPERATURE, RATINGS MAKWUM RATINGS
riCx"1`A ��� s ratamiz..,wa3 44�C(*2°C) 4peratlmalTemperatt¢rs 40° -*85°C
Tpaipr_rattreCoeiBderrtofP")=n --:39461°C MaAmur, S"mttrin:Voltage I(COVDc13PC)
•� vciu�ew
TemperatureCneflidrntofV C.-'lgid°C_ I=D00YDc(t'L) City of
_
�+o
fe[nper;7turtaCoeR?denta€:>�, O.tJSecn'C. �tax5ecl�FusaRating 3 15A(Power t7.k35x6)
\\ 20A(Power _>?93Y7) Whecd Ridge
% ��^''••^��� 'rmewa'�tyse n.tsmtv+urHvxw�fnrm rs mccest>��it
ing Division
i WARRANTY PACKAGING CONFIGURATION
Fl
1 10 year Product WOrlimanshipWarranty Modules per bm30pieces
25 year Unear Poweq Wa -army Modules per 4fs' container:840 pfeee,
'Reasre#ea U'i Wadtctr�arcdnty for __C.,'r
CITICIIII 5AfETIANIIN TALLk.T1CN INSTRUCTJONS BEFOQEUSINC,TH FRODUCT.
linasolar 02D17rr?•aSnlarLrr d.At;nghtsieservecSpeofca,"orv,;inducedi,_dataslhahtaresubieCTt0fhangewithout notice, SHEET NAME �+g,,,I �
Iter sn r
iuc moer; TSM_EN. 2016_A wWr ,:. r asotar com SPEC S }i E E T
PAGE NUMBER( REVISION
SS jj(
II
o'
Basic Features
• Stamped Seamless Construction
• 18 Gauge Galvanized Steel
• Powder Coated Surfaces
• Flashes into the roof deck
• 3 Roof deck knockouts .5", .75" V
• 5 Centering dimples for entry/exit
fittings or conduit
• 2 Position Ground lug installed
• Mounting Hardware Included
—Fuse holders and terminal blocks
added in the field must be UL listed or
recognized and meet 600 VDC 30 AMP
114C for fuse holders, 600V 50 AMP
90C for rail mounted terminal blocks
and 600 V 175 AMP 90C for Power
Distribution Blocks, Use Copper Wire
Conductors.
SolaDeck Model SD 0783
SolaDeck UL50 Type 311 Enclosures
Available Models?
Model SD 0783 - (3" fixed Din Rail)
Model SD 0786 - (6" slotted Din Rail)
SolaDeck UL 1741 Combiner/Enclosures
Models SD 0783-41 and SD 01786-41 are labeled and ETL listed UL STD 1741
according to the UL STD 1741 for photovoltaic combiner enclosures.
Max Rated - 60OVDC, 120AMPS
Model SD 0783-41 3" Fixed Din Rail fastened using Norlock System
**"typical System Configuration
4- Din Rail Mounted Fuse Holders 60OVDC 30 AMP
1- Power Distribution Block 60OVDC 175AMP
1- Bus Bar with UL lug
Model SD 0786-41 6" Slatted Din Rail fastened using steel studs
**Typical System Configuration
4- Din Rail Mounted Fuse Holders 60OVDC 30 AMP
4- Din Rail Mounted Terminal Blocks
Bus Bars with UL lug
conduit or fittings, base is
center dimpled for fitting
locations.
Model SD 0783-41, wired with Model SD 0786-41, wired with
Din Rail mounted fuse holders, Din Rail mounted fuse holders,
bus bar and power distribution terminal blocks and bus bars.
block.
RSTC Enterprises, Inc . 2299 Heimstead Road . Eau Cliare, Wt 54703
For product information call 1(866)367-7782
BLUE RAVEN
1403 N RESEARCH WAY, BUILDING J
OREM, UT 84097
800-377-4480
i1i/•,1IV.BLUE RAVENS OLAR.COM
CONFIDENTIAL -THE INFORM=ATION
HEREIN CONTAINED SHALL NOT BE
USED FOR THE BENEFIT OF
ANYONE EXCEPT BLUE RAVEN
SOLAR NOR SHALL IT BE
DISCLOSED IN'V•1HOLE OR IN PART
TO OTHERS OUTSIDE RECIPIENTS
ORGANIZATION, EXCEPT IN
CONNECTION WITH THE SALE AND
USE OF THE RESPECTIVE
EUUIPNlEN1. Wit HOUT THE
VdRITTEN PERMISSION OF BLUE
RAVEN SOLAR LLC.
ABCEP
CERTIFIED
PV INSTALLATION
PROFESSIONAL
Scott Gurney
# PV -011719-015866
CONTRACTOR:
BRS FIELD OPS
385.498.6700
city of
Wheat Ridge
Built ng Division
SHEETNAME
SPEC SHEET
_ AG NUMBER REVISION
SS 1 0
S F M
Star Washer is
Single Use Only
TERMINAI-11`)RQUE,
install Coir' . actor and
torque to the followir
4-6 AWG, 35in-lbs
8 AWG: 25 in -lbs
10-14 AWC--. 20 in -lbs
TERMINAL TORQU51'
Install. Conductor and
torque to the following.
4-14 AWG: 35in-lbs
WEEBLUG
Single Use Only
46 TERMINALTORQUEi.�,
Install Conductor and
torque to the following:
6 -14 -AWG- 7ft-lbs
LUG DET IL & TORQUE INFO LUG DETAIL Rx TORQUE k'1170 LUG DETAIL & TORQUE If-IF0
11sco Lay -In Lug (GBL-4DBT) 11sco Flange Lug(S66-4) WiLeyWEEBLug (6.7)
0 10-32 mounting hardware a 1/4" mounting hardware 0 1/4" mounting hardware
& Torque = 5 ft -Lb 0 Torque = 75 in -Lb 0 Torque = 10 ft -Lb
0 AWG 4-14- Solid or Stranded 4 AWG 4-14- Solid or Stranded 0 AWG 6-14 -Solid or Stranded
NOTE: ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION
E -W BONDING PATH: E -W module to module bonding
is accomplished with 2 pre-installed bonding clips
which engage on the secure side of the MicroraiLTm
and splice.
N -S BONDING PATH: N -S system bonding is
accomplished through a N -S bonding clip. Insert each
end of the N -S bonding clip onto a module frame
flange. C i; X2,6 ,,, i
i;.J""' �' Er it is i-�,commended that N--,- !',,,;ndinQ ctips
be installed on both edges for ease of rn�,0ntenance
also: maintenance Pane, S!
System bonding is accomplished through modules. System grounding accomplished by attaching a ground Lug to any module
at a Location on the module specified by the module manufacturer.
lk
Net.-
BLUE RAVEN
1403 N RESEARCH WAY. BUILDING J
ORENI, UT 84097
800-377-4480
'0AAJ'Al. B LU E RAVENS OLAR.0 OM
CONFIDENTIAL - THE INFORMATION
HEREIN CONTAINED SHALL NOT BE
USED FOR THE BENEFIT
qT OF
ANYONE EXCEPT BLUE RAVEN
SOLAR NOR SHALL IT BE
DISCLOSED IN'I,,HOLE OR IN PART
TO OTHERS OUTSIDE RECIPIENTS
ORGANIZATION, EXCEPT IN
CONNECTION WITH THE SALE AND
USE OF THE RESPECTIVE
EQUIPMENT.V',IIIHOUT THE
VVRI'TTEN PERMISSION OF BLUE
RAVEN SOLAR LLC.
NABCEP
�CERTIFIED
PV INSTALLATION
PROFESSIONAL
Scott Gurney
PV -011719-015666
CONTRACTOR:
SRS FIELD OPS
385.498.6700
SHEET NAME
SPEC SHEET
PAGE NUMBER R EVI SiON
SS 1 0
AUTHORIZATION TO MARK
This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s)
Covered section when made in accordance vvith the conditions set forth in the Certification Agreement and Listing
Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing
Report.
This document is the property of Intertek Testing Services and is not transferable. The certification marks) may be
applied only at the location of the Party Authorized To Apply Mark.
Applicant: Unirac, Inc Manufacturer: Jiaxing Pacific Energy Equipment Corp.
No. 8 Haiwan Ave
1411 Broadway Blvd NE Hangzhou Bay Bdao New Area
Address: Albuquerque, NM 87102 Address: Haiyan Economic Development Area
Jiaxing City, Zhejiang Province
Country: USA Country: China
Klaus Nicolaedis Lili Zeng
Contact: Jason Mayfield Contact: George Huang
Phone: 505-462-2190 Phone: 510-979-1920
505-400-2949 650-799-7627
FAX: NA FAX: NA
klaus.nicolaedis@unirac.com Email: lzeng@ccmfg.com
Email: jasonm@unirac.com george@ccmfg.com
Party Authorized To Apply Mark: Same as Manufacturer
Report Issuing Officer Lake Forest, CA
Control Number: 5003278 Authorized by: �
for Dean Davidson, Certification Manager
US
OTT
Intertek _
This document supersedes all previous Authorizations to Mark far the noted Report Number.
This Authorization to Mark isfor the exclusive use of Intertek's Client and is provided pursuant to'the Certification agreement between Interok and its Client. Intertek'sresponsibihty and liability are
limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage. occasioned
by the use of'this Authorization to Mark Only the Client i5 authorized to permit copying o,r.distnbutionofthis Authorization to Mark andthen only in its entirely Use of Intenek's Certification mark is
restricted to the conditions laid out in the agreement and in this Authorization to Matk Any further useofthe Intertek name for the sale or ad,ertisement of the tested material, product or senri':e must
first be approved in writing by Intertek Initial Factory-Assassments and Followup Services are for the purpose of assuring appropriate usage of the Certification mark in accordance wath the
agreement, they are not for the purposes of production quality control and do not relieve the Client of the,r obligations in this respect.
Intertek Testing Services NA Inc.
545 East Algonquin Road, ArlingtonHeights; IL 60006
Telephone 800-345-3851 or 647-439-5667 Fax 312-283-1672
ATM for Report 102393982LAX-002 Page 1 of 2
ATM Issued: 2 -Mar -2017
ED 16.3.15 (1 -Jul -1, 6) Mandatory
BLUE RAVEN
1403 N RESEARCH WAY, BUILDING J
OREtvi, UT 84097
800-377-4480
vVIA W.BLUERAVENSOLAP,.COM
CONFIDENTIAL - THE INFORMATION
HEREIN CONTAINED SHALL NOT BE
USED FOR THE EENEFIT OF
ANYONE EXCEPT BLUE RAVEN
SOLAR NOR SHALL IT BE
DISCLOSED W WHOLE OR IN PART
TO OTHERS OUTSIDE RECIPIENTS
ORGANIZATION, EXCEPT IN
CONNECTION WITH THE SALE AND
USE OF THE RESPECTIVE
EQUIPMENT, V411 HOUT TI iE
V.'RIT TEN PERMISSION OF BLUE
RAVEN SOLAR LLC.
EP
CERTIFIED
PV INSTALLATION
PROFESSIONAL
Scott Gurney
# PV -011719-015866
CONTRACTOR:
BRS FIELD OPS
385.498.6700
OS
Wh6a� V%d9e
Brill �r9
O' iixo�
HEFT NAIME
SPEC SHEET
GE NUMSE? ��E'v€S€ON
ss 0
UL 2703 Issued: 2015101/28 Ed: 1 Mounting Systems, Mounting Devices, Clamping/Retention Devices,
Standard(s):
and Ground Lugs for Use with Flat -Plate Photovoltaic Modules and Panels
Photovoltaic Mounting System, Sun Frame Micro Rail- Installed Using Unirac Installation Manual, Rev
Product:
PUB2017FEB16
Brand Name:
Unirac
Models:
Unirac SFM
ATM for Report 102393982LAX-002 Page 1 of 2
ATM Issued: 2 -Mar -2017
ED 16.3.15 (1 -Jul -1, 6) Mandatory
BLUE RAVEN
1403 N RESEARCH WAY, BUILDING J
OREtvi, UT 84097
800-377-4480
vVIA W.BLUERAVENSOLAP,.COM
CONFIDENTIAL - THE INFORMATION
HEREIN CONTAINED SHALL NOT BE
USED FOR THE EENEFIT OF
ANYONE EXCEPT BLUE RAVEN
SOLAR NOR SHALL IT BE
DISCLOSED W WHOLE OR IN PART
TO OTHERS OUTSIDE RECIPIENTS
ORGANIZATION, EXCEPT IN
CONNECTION WITH THE SALE AND
USE OF THE RESPECTIVE
EQUIPMENT, V411 HOUT TI iE
V.'RIT TEN PERMISSION OF BLUE
RAVEN SOLAR LLC.
EP
CERTIFIED
PV INSTALLATION
PROFESSIONAL
Scott Gurney
# PV -011719-015866
CONTRACTOR:
BRS FIELD OPS
385.498.6700
OS
Wh6a� V%d9e
Brill �r9
O' iixo�
HEFT NAIME
SPEC SHEET
GE NUMSE? ��E'v€S€ON
ss 0
ERIC
: a U N F R A 1`4 E 144 11'C" R 0 R A I
Man.
G
RA I S F. D_ S E A I. TL A S-11. 111
ow
TABLE OF CONTENTS:
Tools & Assembly Details
Quick Steps for installation
PG
I I
JIMM211[113H111111
PUB2017JAN11
one SUNFRAME MICRORAIL
In : RAISED SEAL FLASHPIG,
TOOLS REQUIRED OR RECOMMENDED FOR
LAYOUT & INSTALLATION:
• TAPE MEASURE
• CHALK LINE
• ROOFING CRAYON
• HAMMER
• COMPATIBLE SEALANTAND DISPENSER
• DRILL WITH EITHER 1/8" BIT FOR GRK AND
• UNIRAC CUSTOM STRUCTURAL 5CREWOR 7/37'
SIT FOR LAG BOLT
- IMPACT DRIVER WITH W SOCKET (OPTIONAL W
HEX DRIVER FOR UNIRAC CUSTOM STRUCTURAL
SCREW)
SFM RAISED SEAL FLASHING COMPONENTS:
1. FASTENER,
LAG BOLT, 5/16*
• UNIRAC CUSTOM STRUCTURAL SCREW. S/167
- GRK STRUCTURAL SCREW. S/16'
INSTALLATION NOTES:
2.5/16- ID EDPM SEALING WASHER A. It is not necessary or advisable to use nails or other fasteners to secure the perimeter of the flashing.
3. SFM MOUNTASSEMBLY (VARIOUS) WITH SLIDER B, The SFM Raised Seat Flashing is made to work with standard and high-definition composition/asphalt and
4, SPM RAISED SEAL FLASHING wood shingle roofswith S* to S-SA'course�
S. COMP SHINGLE ROOF C Mounts shoutd not be instated in areas of the roof susceptible to ice damming. Ponding water can travel
upward under shingles and reach the belt penetration.
D.Fastener length specification and capacity verification are the responsibility of the installer,
TOOLS & ASSEMBLY DETAILS 1 N
TECHNICAL DATA SHEET: PAGE
QUICK INSTALLATION STEPS
INSTALLATION ORE PAGE
---------------------------------------------------------------------------------------------------------------------------------------------
4
PREPARING SHINGLES: Use roofing DRILL PILOT HOLES: Holding the drill ROOF SEALANT: Fitt pilot hole with OPTIONAL SEALANT ON FLASHING:
bar to break seats between Ist and square to the rafter, drill 3"deep pilot appropriate sealant. Apply a circle shaped bead of sealant
2nd, and 2nd and 3rd shingle courses. hole into center of rafter using IA' around the attachment hardware hole
Be 5 ule to remove a LI nails to allow aircraft extension bit for 5/16' GRK of the flashing before insertion. Do
correct placement offLashin(j. See SFM or Unirac Custom Structural Screw or hot use mess ive "a [a m_
installation guide for proper flashing 7/32" aircraft extension bit for 5/16'
placement.---- fag.
1403 N RESEARCH WAY, BUILDING J
OREM, UT 84097
800-377-4480
VffAV.BLUERAVENSOLAR.COM
CONFIDENTIAL -THE INFORMATION
HEREIN CONTAINED SHALL NOT BE
USED FOR THE BENEFIT OF
ANYONE EXCEPT BLUE RAVEN
SOLAR NOR SHALL IT BE
DISCLOSED IN WHOLE OR IN PART
TO OTHERS OUTSIDE RECIPIENTS
ORGANIZATION, EXCEPT IN
CONNECTION WITH THE SALE AND
USE OF THE RESPECTIVE
EQUIPMENT, WITHOUT THE
WRITTEN PERMISSION OF BLUE
RAVEN SOLAR LLC.
ABCEP
CERTIFIED I
PV INSTALLATION
PROFESSIONAL
Scott Gurney
# PV -011719-015866
CONTRACTOR:
BRS FIELD OPS
385.498.6700
PAGE NUMBER REVISION
Ss 1 0
0%
4L11.
.1k
r
POSITION FLASHING: Slide the
PLACE SLIDER: Place slider with
INSTALL FASTENER & TIGHTEN: COMPLETE FLASHING INSTALLATION:
flashi rig up underneath the 2nd course
dSSERIbly over the flashing flute,
Install fastener with seating washer. Repeat previous steps to install all
of shingles, so that the bottom edge
ensuringthat the slider snsilat on the
Swivel the slider to gauge proper mounts.
of the flashing does not overhang the
flashing surface.
torque when driving the fastener.
SHEET NYE
downslope edge of the 1st course of
Tighten until slider stops swiveling
shingles.
easily.
SPEC
EC SHEET
PAGE NUMBER REVISION
Ss 1 0
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: 1� FT
Job Address: 3001 5 hen'd-g/7 44
Permit Number: 201704119-t-1
❑ No one available for inspectio Time i� AM/PM
Re -inspection required: Yes No
When corrections have been made, call for re -inspection at 303-234-5933
Date: Inspector: M r#
DO NOT REMOVE THIS NOTICE
INSPECTION RECORD
Inspection online form: http://www.ci.wheatridge.co.us/inspection
Cancellations must be submitted via the online form before 8 a.m. the day of the inspection
Inspections will not be performed unless this card is posted on the project site
F Request an inspection before MIDNIGHT (11:59 PM) to receive an inspection the following business day
PERMIT: ADDRESS: Y01SR1a&?26WJ03 QODE(
OP
Foundation Inspections Date Inspector
Initials
102 Caissons / Piers
103 Footing / P.E. Letter
104 Foundation Setback Cert.
106 Foundation wall Insulation
Do Not Pour Concrete Prior To Approval Of The Above Inspections
Underground / Slab InspectionsI Date I Inspector
Initials
Com
Comments
201 Electrical / Cable/ Conduit
202 Sewer Underground Int.
203 Sewer Underground Ext.
204 Plumbing Underground Int.
205 Plumbing Underground Ext.
206 Water Underground
Do Not Cover Underground or Below / In -Slab Work Prior To Approval Of The Above Inspections
Rough Inspection
Date
Inspector
Initials
Comments
301 Rough Framing
302 Wall Sheathing
'.iv.7 rwz:.oilcla i
i
304 Sheer Inspection
305 Insulation
306 Mid -Roof
307 Metal / Lath / Stucco
308 Rough Electrical Residential
309 Rough Electrical Commercial
310 Electrical Meter Residential
311 Electrical Meter Commercial
312 Temp. Const. Meter
313 Rough Plumbing Residential
314 Rough Plumbing Commercial
315 Shower Pan
SEE OVER FOR ADDITIONAL INSPECTIONS
Rough Inspection (continued)
Date
Inspector
Initials
Comments
316 Rough Mechanical Residential
!
,
317 Rough Mechanical Commercial
318 Boiler / Furnace
319 Hot water tank
320 Drywall screw and Nail
321 Moisture board / shower walls
1)�71 %
322 Rough Grading
Mai
323 Miscellaneous
Final Inspections
Date
Inspector
Initials
Comments
_
4n2 Gas Kilater Release
!
,
403 Final Electrical Residential
404 Final Electrical Commercial
405 Final Mechanical Residential
406 Final Mechanical Commercial
407 Final Plumbing Residential
1)�71 %
408 Final Plumbing Commercial
409 Final Roof
410 Final Window/Door
411 Landscape/Park/Planning
Inspections from these entities shall be requested
one week in advance.
For landscaping and parking inspections please
call 303-235-2846
For ROW and drainage inspections please call
303-235-2861
For fire inspections please contact the Fire
Protection District for your project.
412 Row/Drainage/Public Works
413 Flood plain Inspection
414 Fire Insp. / Fire Protection
415 Public Works Final
416 Storm Water Mgmt.
417 Zoning Final Inspection
418 Building Final Inspection
Note: All items must be completed and approved by Planning, Public Works, Fire and Building
before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not
constitute authorization of occupancy.
For Low Voltage permits please be sure that rough inspections are completed by the Fire District and
Electrical low voltage by the Building Division.
Zo�7t�'s3Y
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type:16 ?1, 6k),40 -
Job
Address:
Permit Number:70E-3-
❑ No one available for inspection: -Time %`' = t 4� AM-/Pm,,,/
Re -Inspection required: Yets No
When corrections have been made, call for re -inspection at 303-234-5933
Date: ,d 7d ~- Inspector: 63; )
DO NOT REMOVE THIS NOTICE
City of Wheat Ridge
f Residential Plumbing PERMIT - 201708334
PERMIT NO: 201708334 ISSUED: 10/16/2017
JOB ADDRESS: 3001 Sheridan BLVD EXPIRES: 10/16/2018
JOB DESCRIPTION: Residential plumbing replacement of 40,000BTUs, 40gallon water neater, like
for like
*** CONTACTS ***
OWNER (303)233-1992 ANDERSEN ROBERT MOHAN
SUB (303)766-7500 Jeff Belk 021818 Plumbline Services
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: R-3 / Residen-ia'
SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 3,000.00
FEES
Hot Water Heater 40.00
Total Valuation 0.00
Use Tax 63.00
** TOTAL ** 103.00
*** COMMENTS ***
*** CONDITIONS ***
All work shall comply 2012 International Codes, 2014 NEC (if applicable), and ordinances
adopted by the City of Wheat Ridge. Work is subject to field inspections.
I by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications;
applicable building codes, and al( applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be
performed and that all work to be performed is disclosed in this document and/or its' accompanying approved pIans and specifications.
Signature of OW��CONTRACTOR (Circle one) Date
1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the originalpermit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any
applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to Field inspection.
Signature of Chiefld� 1 Date
REQUESTS MUST BE MADE BY 11:59PM DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
»" City of
Wheat j,dge
COMMUNITY DEVELOPMENT
Building & Inspection Services Division
7500 W. 29`h Ave., Wheat Ridge, CO 80033
Office: 303-235-2855 * Fax: 303-237-8929
Inspection Line: 303-234-5933
Email: permits ci.wheatridge.co.us
FOR OFFICf. USE ONLY
Date: // /7
Plan/Permit # X1/7
Plan Review Fee: 1103,00—
Building
Permit Application
*** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. **"
Property Address: •3C)ok 'S'keroAwn 214r)
Property Owner (please print): Ian \M 1\..rQer:ten Phone: 3 ) a3�- lacS�
Property Owner Email:
Mailing Address: (if different than property address)
Address:
City, State, Zip:
Architect/Engineer:
Architect/Engineer E-mail:
Phone:
Contractor: ? \j, 0o, ,,4,%P Se;-vVc e S
Contractors City License #: n -A- 19 L 8 Phone:
Contractor E-mail Address: l�errn.i',� t�l�.ntnb•n(�sEryu; GS : cc M
Sub Contractors:
Electrical:
W.R. City License #
Other City Licensed Sub:
City License #
Plumbing:
W.R. City License #
Other City Licensed Sub:
City License #
Mechanical:
W.R. City License #
Complete all information on BOTH sides of this form
❑ COMMERCIAL X, RESIDENTIAL
Description of work: (Check all that apply)
❑ NEW COMMERCIAL STRUCTURE ❑ ELECTRICAL SERVICE UPGRADE
❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING
❑ COMMERCIAL ADDITION ❑ RESIDENTIAL ROOFING
❑ RESDENTIAL ADDITION ❑ WINDOW REPLACEMENT
❑ COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT
❑ ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
❑ OTHER (Describe)
(For ALL projects, please provide a detailed description of work to be performed, including current use of areas,
proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and
amount of materials to be used, etc.)
Re pace x-10 c �11�9n W'a }er- 1keQt Ves
Sq. Ft./LF Btu's
Amps
Squares
q 6 t,� Gallons
Other
Project Value: (Contract value or the cost of all materials and labor included in the entire project)
$ 3ooc)
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or
regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are
accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance
with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner
or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any
entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the
truthfulness of the information provided on the application.
CIRCLEONE: (OWNER) (CONTRACTOR) or (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR)
L
Electronic Signature (first and last name): —y-- , �/ DATE: 10 1 t 3 I
ZONING COMMMENTS
Reviewer
BUILDING DEPARTMENT COMMENTS:
Reviewer
DEPARTMENT USE ONLY
OCCUPANCY CLASSIFICATION:
Building Division Valuation: $
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: 1� FT
Job Address: 3001 5 hen'd-g/7 44
Permit Number: 201704119-t-1
❑ No one available for inspectio Time i� AM/PM
Re -inspection required: Yes No
When corrections have been made, call for re -inspection at 303-234-5933
Date: Inspector: M r#
DO NOT REMOVE THIS NOTICE
b City of Wheat Ridge
�. Residential Electric PERMIT - 201.704154
PERMIT NO: 201704154 ISSUED: 07/17/2017
JOB ADDRESS: 3001 Sheridan BLVD EXPIRES: 07/17/2018
JOB DESCRIPTION: Residential electrical replacement 125 amp subpanel like for like
*** CONTACTS ***
OWNER (303)233-1992 ANDERSEN ROBERT MOHAN
SUB (303)766-7500 Jeff Belk 021818 Plumbline Services
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: R-3 / Residential
SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 2,500.00
FEES
Total Valuation 0.00
Use Tax 52.50
Permit Fee 93.35
** TOTAL ** 145.85
*** COMMENTS ***
*** CONDITIONS ***
Must comply w/ 2012 IRC & 2014 NEC. Subject to field inspection.
I by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
thisermit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be
performed and that all work tr �erformed is disclosed in this document and/or its' accompanying approved plans and specifications.
7/17117
Signature of OWNER or CONTRACTOR (Circle one) Date
1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the originalpermit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of an manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any
applicable co any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
A ,
' City of
W heat R�e
r C ommu ry DEVELOPMEN r
Building & Inspection Services Division
7500 W. 29" Ave, Wheat Ridge, CO 80033
Office: 303-235-2855 * Fax: 303-237-8929
Inspection Line: 303-234-5933
Email: permits(aci.wheatridge.co.us
FOR OFFICE USE ONLY
Date:.� l
Plan/Permit
Plan Review Fee: �-
Building Permit Application
*** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. **"
Property Address: -1601 Sher, LQC4 n `ilX
Property Owner (please print): T_��,W A rjerS'3 n Phone:
Property Owner Email:
Mailing Address: (if different than property address)
Address:
City, State, Zip:
Arch itectiEngineer:
Architect/Engineer E-mail: Phone:
Contractor:
Contractors City License #: Phone: 17(
,6,7 560
Contractor E-mail Address: pern,Sat@ jv%Ab1,*e sefi-vtitc.� coM
Sub Contractors:
Electrical:
W.R. City License #
Other City Licensed Sub:
City License #
Plumbing:
W.R. City License #
Other City Licensed Sub:
City License #
Mechanical:
W.R. City License #
Complete all information on BOTH sides of this form
❑ COMMERCIAL XRESIDENTIAL
Description of work: (Check all that apply)
❑ NEW COMMERCIAL STRUCTURE NKIELECTRICAL SERVICE UPGRADE
❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING
❑ COMMERCIAL ADDITION ❑ RESIDENTIAL ROOFING
❑ RESDENTIAL ADDITION ❑ WINDOW REPLACEMENT
❑ COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT
❑ ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
❑ OTHER (Describe)
(For ALL projects, please provide a detailed description of work to be performed, including current use of areas,
proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and
amount of materials to be used, etc.)
Sq. Ft./LF
Amps
R--- PlaC e V)iS AAP
Btu's
Squares
Gallons
Other
Project Value: (Contract value or the cost of all materials and labor included in the entire project)
$ JSoo
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or
regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are
accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance
with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that 1 am the legal owner
or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any
entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the
truthfulness of the information provided un -the application.
CIRCLE ONE: (OWNER) CONTRACTOR) orti (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR)
Electronic Signature (first and last name): �'" DATE:
ZONING COMMMENTS:
Reviewer:
BUILDING DEPARTMENT COMMENTS:
Reviewer:
DEPARTMENT USE ONLY
OCCUPANCY CLASSIFICATION:
Building Division Valuation: $
FOR OFFICE USE, ONLY
gate;
,u, t 1 ,cel
x i+C
Building & Inspection Services Division @$
7500 K 291h Ave., Wheat Ridge, CO 80033 Plan Review Few
Office: 303-235-2855 * ax: 303-237-8929
Inspection Line: 303-234-5933
Email: errnts c€. eetrid e.cr.s
Building Permit Application
*
Please tomplete all highlighted areas on both sides of this form. Incomplete applications mar not be Processed. ***
Pest Address: . S
Property Owner (please print}: , Phan : - 43
Property Owner Email:
Address.
City, State, i
Architect/
Co 1 ��
Contractors City License 1 Phone
.-__1176--7'TOO
Contractor E-mail
P""
Electrical: Plumbing: Mechanical.
W.R. City License ## W.R. City license # W.R. City License##
Other City Licensed Sub: Other City licensed Sub:
City License # City License #
Complete all information on BOTH sides of this form
Q COMMERCIAL PtRESIDENTIAL
0 NEW COMMERCIAL STRUCTURE ELECTRICAL SERVICE UPGRADE
0 NEW RESIDENTIAL STRUCTURE COMMERCIAL ROOFING
0 COMMERCIAL ADDITION 0 RESIDENTIAL ROOFING
RESDENTIAL ADDITION 0 WINDOW REPLACEMENT
COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc,)
MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
& PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT
ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
OTHER (Describe)
!SewetNe ,/art:9, AV�?rox, -AO'
Sq. Ft LF Btu's Gallons
Amps Squares Other
Project Value.* (Contract value or the cost of all materials and labor included in the entire project)
$__ 66, .
O`ANER/C0NTR,,-kCT0R SIGNATURE OF UNDER AND AGREEMENT
I hereby certi(v that the setback distances proposed by this permit application am accurate and do not violate applicable ordinances, rules or
regulations of the City of Wheat Ridge or covenants, casements or restrictions of record-, that all measurements shown and allegations made are
accurate: that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance
with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application, that I am the legal owner
or have been authorized by the legal owner of the property to perforin the described work and am also authorized by the legal owner of an}
entity included on this application to list that entity on this application. 1, the applicant for this building penitapplication, warrant the
truthfulness of the information provided on the application,
CIRCLE OIVE� (OWNER) (COAITRACTOR) 4Lr (AUTHORIZED REPRESENTATIVE) of (OWNER) (C01VTRACTOR)
Flectronic Simatt(first and last nanit): DAT]i
. o~ WHEql
~ m City of Wheat Ridge
COLORPResidential Mechanic PERMIT - 060651
PERMIT NO:
060651
ISSUED:
07/25/2006
JOB ADDRESS:
3001 SHERIDAN BLVD
EXPIRES:
01/25/2008
DESCRIPTION:
Replace A/c w/2.5 ton,
14 seerA/C&coi1. 150 Amp
Service pane
CONTACTS
owner 303/233-1992 Bob/Sherry Anderson
gc 303/980-5544 Stephen Korff 02-1935 Front Range Mechanical Service
gc 303/980-5544 Stephen Korff 02-1935 Front Range Mechanical Service
PARCEL INFO
ZONE CODE: UA USE: r-3
SUBDIVISION: UA BLOCK/LOT#: 0/
FEE SUMMARY ESTIMATED PROJECT VALUATION: 4,325.00
FEES
Permit Fee 144.70 im
Total Valuation .oo Use Tax 77•85
TOTAL 222.55
Comments
CiN of Wheat Ridge PRESCRIPT{VE ENERGY CO
BOILE:itS 1 FIIRNACES A MW IMUM OF 90% AFUE
(;AS WATER HEATERS A MINIMUM OF,60 ENERGY FACTOR
ELECTRIC WATER HEATERS A MINIMUM OF.93 ENERGY FACTOR
SETBACK THERMOSTAT REQUIRED (EXCEPT HYDRONIC HEAT)
R-21 WALLS ■ RJ8 CEILINGS • R•19 CRAWLSPACES
I hereby certify that the eetback distances proposed by this permit application are accurate, and do mt violate applicable
ordinances, rules or regulations of the City of wheat [tidge or covenants, easementa or reetrictions of record; that all
measurements ahown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this
application and that I asaume full responeibility Eor compliance with the Wheat Ridge Building Code (I.B.C) and all other
p [ Ridge Ordinancee) for work under this permit. Plans subject to field inspection.
~ ~J=- -1-2- 15 =06
of contractor/owner date
1. This permit was iasued in accordance with the provisions set forth in your application and is aubject to the laws of Che
State of Colorado and to Che Zoning Regulations and Building Codes of wheat Rid9e, Colorado or any other applicable
ordinances of the City.
2. This permit ehall expire if (A) the work auChorized ie not commenced within sixty (60) daya from iasue date or (H) the
building authorized is suspended or abandoned for a period of 180 daye.
3. If [hie permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no
changes have been or will be made in the ori9inal plans and specifications and any suspension or abandonment has not
exceeded one (1) year. If changes have been or if suspension or abandonmen[ exceeds one (1) year, full fees shall
be paid for a new permit.
4. No work of any manner shall be done chat will change the natural flow of water causing a drainage problem.
5. Contractor shall notify the Building Inepector twenty-four (24) hours in advance for all inspections and shall receive
written approval on inspection card before proceeding with succeasive phases of the job.
6. The issuance of a permit or the approval of drawings and specifications aha11 not be construed to be a permit for, nor
an a rof, u+Y vio a~~ of the provisions of the building codes or any other ordinance, law, rule or regulation.
ply"nLdWY'ev]!ti+! s_eubjef,t,Ee'Sield inspections.
Signature
Building Offical
INSPECTION REQUEST LINE: (303)234-5933 BUILDING OFFICE: (303)235-2855
REQUESTS MUST BE MADE BY 3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
F WHEqT
O ,P
` o
t? m
C~~ORADO
BUILIl17VG PERMITAPPLI~'.~4T`IC?N
PropertyOwner: $eg+ S1%errly Q-u tfse/,
PropertyAddress: 3ppt s{%Q,r;do,-% 13(t/J. Phone:3o3"A33' 1972
Conh'actor License No.: Z 1$ 3s
Company: F'p,pn{- F~_s~ SNtv: ic,y. Phone:3o3- 4Db's"`r
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I Buildina Dent. Valuation Figure: $
City of Wheat Ridge
Community Development Department Date:
MINOR
Building Permit Number:
I hereby certify that the setback distances proposed by this permit appiication are
accurele, and do not violate applicable ordinances, rules or regulations of the City of
Wheat Ridge or covenants, easements or reslrictions of recortl; that all measuremenLs
shown, and allegations made are accurate; that I have read and agree to abide by all
conditions printed on this application and that I assume full responsibility for
compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat
Ridge Ordinances, for work under this permit. Plans subject to field inspection.
(O W NER)(CO NTRACTOR):
7-
Value:$ 14
zS•"
Permit Fee:$
Plan Review Fee:$
Tatal:$ y5W
Use of Space (description): 9rbkac& Itle, N%J~ 1.1Gp1 14Sur ;.f' ron
Description of work: ~7,,,~aC / ~ " f~~~e` p'
r~
Sq.Ft.added
Electrical License No: 211$5- /Plumbing License No:
Company:~f &J~/ht~~ ~ Company:
Mechanical License No: .2 0 3r
Company:.Firotr~ R.v51!_ pncfJwA~~
SeAN~ee.s •
Expiration Date: Expiration Date: Expiration Date:
Approval: Approval: Approval:
(t) This pertnit was issued in acwrdance with the provisions sel forth in your application and is subject to the laws of the State of
Cobrado and to the Zoning Regulalions and Building Codes of Wheat Ridge, Colorado or any olher applicable ordinances of
the Ciry.
(2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (8) the building
authorized is suspended or abandoned for a period of 180 days.
(3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes
have been orwill be made in the original plans and specifcafions and any suspension or abandonment has nol exceeded one
(1) year. If changes have been or if suspension orabandonment exceeds one (t) year, full fees shall be paid for a new permit.
(4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
(5) Contractor shall notify the Building Inspector iwenty-four (24) hours in advance for all inspections and shall receive written
approval on inspection card before proceeding with successive phases of the job.
(6) The issuance of a permit or the approval of drawings and specifcations shall not be wnslrued to be a permit for, nor an
approval of, anyviolation of the provisions ofihe building codes or anyother ordinance, law, rule or regulation. All plan review
is subJect to field inspections.
Chief Buildina Official
Building Permit PermitNumber
~ 19459
CTPYOF WHEAT RIDGE 11/7/2005
7500 Weet29TH Avenue
vVhwttidp, co e0033
` Inspecfion Line
303-235-2855 cuyotwt;mrsdar (
- 303•234-5933
Residential Mechanical
pROPERTY 3001 sheridan blvd Unit:
owNER: Robert Anderson (303) 233-1992
nescripaoo
1 Replace 60,000 btu fiuuace, coil and humidifier the furnace shall be a 90 min AFUE.
FEES -
Fees
Use Tax
Permit Fee
Total Fees
~
~`.3~`~~~.',/
IGONTRACTORS I I ~
Name License # Phone
PositivelyfleciriC 19206 000423-1807
' Westech Mechanical, Inc. 18745 000 986-0366 I
~ MbLQf Wheat idge PRESCRIPTIVE ENpRGY CODE
BOILEPS ; fURNACES A MINIMUM OF 90°/, AFUE
(iAS WATEk HEATERS A MINIMUM 0~ .6Q ENERGY fACTOR
ELECTRIC WA?ER HEATERS A MINIMUM OF .93 EMERCaY FACTOR
SETBACK THERMOSTAT REQUIRED (EXCEPT HYDRONIC HEAn
R-21 WALLS • R-38 CEILINGS - R•19 CRAWLSPACEs
Urtita: Occupancy: r-3 Walls: Roof: Stories: Sq Feet: a
Ihe[tly eettl(r tIprt.tMeNIpW[ d4h. Propoud EY tGb perml[ aPPReatioo are mcuratq aod do oot vtolate applleable ordinmca, rula or neehtlmu of the LYty af
K'M1O<HWp orervmoY, etlenmb or reeMCllovj of reeortl; W[ vll mueurtmrnb Mowo, anA ollegatbm matle ve ucunh; Na1 [ hrve read aod apa lo ab1Ae by
'i WroMitleuq{~i! Imibb~pylleaHOn,aodfhatlmometWlrcapouqbWyformmpll~nuwiththeWAactRidG<ButltlineCOtle¢.B.C.)aed~iotherapplk~bk
~ Wbe~tBW[ o wowkuetlerNbMemit. /
11,17
D TE
1. peeWtwe ImN In mcorMoce with Ne proWlom .t forfh io yavr ~pp1lmUOn and 6 aubject to the Ivws of the Stah of CobrWo aod ro Ne Zovinp
, RryoBlbdflnABu11~6CadeotWhea[RldgqColondoor.uyoNttappOCabkordinmcuofNeClty.
l Every peroll Yeued shW berome InvWd uoms Ne work on tbe elte ouNOrizM Uy iucM1 psrni[ u roounenced wlthin 180 Jay.afler IU lae~na, or if We work
wNwlmd oatheWe.Oy weh permit 4 ewpeeEetl or obaoDOOM 4r a period of 180 tlaya .Ner Ne Ume ofwork 6 wmmeoced.
)IIOY plmY.!#plm, a new yerMt mry be oryu4ed tor a Re ofooo-6alf Ne amoum normAy nqulretl, proviEed no cMnea heve bnn w wW be made In We
o11gbaFpiwwd qM6ptlov aod my aurpuuloo or ~mndamosut ha oot exaMed one (q yuc If c~aoeo m wde or If mipemlon wobmdoomeut
exeKh qeplJar, NYfmNJlbeptltlfora oewperoJt.
v/ NU wM, o(W atoosr sha0 ba doee tba[ wW chmte the nrtunl ibw of wahr cowlne a dninvge probkm.
SGoymitetar WC moeft Ihe BWItlWe Inupenor tweaty-four (]A) poun In mAvmee for N IncpeNOU antl Aall rettive wAnm approvN ov Impectlw nrtl bekn
0
^ b' • w the pprovd o mE epecitir~tbm shdl not be romtrved to be c permitlor, ppmv+l of, my vbhdbn otthe
SYav ortlioaoeR Vw, ruk or nCdatbn.
.CwBeffidV[laqueea, S[GNEDDATE
'Monday, Nowember 07, 2005 Page 1 of 1
COMMUNI'TY DEVELOPMENT DEPARTMENT Building Pertnit Number.
;of ~r,p gU1LDING INSPECTION LINE -303-234d933 Date:
~ CITY OF WHEAT RIDGE
" 7600 WEST 29TH AVENUE
WHEAT RIDGE, CO 80033 - (303-236-2865)
APPLICATION
Proper[y Owner:~~~ ~iile.vnn/$y~~~r
r,nperry waaress: rnone: ~7r-]z- Zh 9 z-.
ContractorLicenseNo.:
Company:~~.-~ Phone:
/ GUC/ 7
SIGNANRE OF UNDERSTANDING AND AGREEMENT I Buildina Dept Valuation Figure:
I hereby certify that the setback distances proposed by this pemit appliption are
accurate, and do not violate applicable ortlinances, rules or regulatlons otthe City of
Wheat Ritlge or covenants, easemeMS or restrictions of reoorcl; ihat all measurements
shown, and allegations made are accurate; that I have read and agree to abitle by all
conditlons pnnted on this application aM that I assume tull responsibility for
compliance with the Wheat Ridge BuiWirg Cotle (I.B.C) and all oMerapplicable Voieat
Ridge OMinances, for work urMer this pertniM~s subjed to field inspection.
(OwNER)(CQUIBACTORL SIGNE DATE
(OWNER)(CONTRACTpR):PRINtED /l
e12
/!///!LI_.~sc.~tlaTEl~
Permit Fee:$
Plan Review Fee:$
USC T3X:$
Tota'.$
Use of Space (description):
Description of work: lww,.E /~oDD %i'Z/
Sq. FL added
COMMENTS:
Approval:
Zoning:
!`ING COMMENTS.
ApprovaP.
wORKS CcMrOruTS:
AFNiuvai:
BUILDING DEPARTMENT USE ONLY
DEPARTMENT COMMENTS:
Approval:
Walls: Roof: Stories:
Electrical License No: l l lVIv Plumbing License No: Mechanical License No: #Y777
Company:/Pc5/T/✓ELy6'GCtT2/L Company: Company:
303- yz3 - lgn-7
Expiration Date: Z/~ /Z007 Expiration Date: Expiration Date: 2//y/zoD~p
Approval: / ~ Approval: Approval:
(1) This permit was issuetl in accor0ance with the provisions set forth in your application antl is subjeclto the laws ofthe State of
Coloredo and to the Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other appliwble ortlinances of
the City.
(2) This pemit shall expire'rf (A) the woric authorizetl is not commenced within sixry (90) days from issue tlate or (B) the building
authorized is suspentletl or abantlorred for a period of 180 days.
(3) Ii this permit expires, a rrew permit may be acquired for a tee of one-hatf Me amouM normally required, provided no changes
have been orwillbe made in the original plans and specifications and any suspension or abandonment has not exceeded one
(1) year. If changes have been or if suspension or abandonment exceeds one (1) year, tull tees shall be paid for a new permit.
(4) No work of any manner shall be tlone that will Uange the natural 8ow of water causing a tlrainage problem.
(5) ConVactor shall notify the BuiWing Inspector twenry-tour (24) hours in advance for ail inspections aM shall receive written
approval on inspection card before proceetlirg wiM successive phases of fhe job.
(6) The issuance ot a pemit or tfie approval oi drawings arW specifications shall not De constnred to be a pemit for, nor an
approval of, any violation of the provisions of the building cotles or any other ordinance, law, rule or regulation. All plan
revlew Is subJect to fleltl InspeMbns.
Chief Building Official
n N
n~
0
~
o~wd .
ws
~ m
A n
N 0
W (CD7 ~
W O ~
N
S
<
~(D
CD
~~~y
~
N ~
,
N
v
~ n_. a \ a
r~
r
~
b
L.
0
~
a
C
(D
N
♦ /
~
o CDZ
cD W 0 ~
o v
r+ ~ cn m
0' w CD <
~
ZN ~
o
N v, v9
= <z
0
(D
'v
~
COMMUNITY
7500 wES7 29tn AvENUE DEPAR BUMENT ILD N~ IN PECTION D VISION DEVELOPMENT
PERMIT N0.
287-6944 EXT. 255 P.O. BoX 838 CITY OF WHEAT RIDGE, COlO.
THIS PERMIT VALID ONLY WHEN SIGNED BY THE CNIEF BUILDING INSPECTOR AND RECEIPTED BELOW.
JOB ADDRESS
CONTRACTOR C/'Cr /IC-C ,r[~ZrI~-.u«.r-~ orsi rn =
ADDRESS A Y- F D S/ M N/ S
CITY~S..~~ 01~ N/ ZiP CODE v¢D I
PHONE 6) b l LICENSE NO
OWNER '~5~~~~5 /F~NnDE",uNA 1- 1-
A d
DDRESS 3 o D j C/G ~ -c-IL/
PHONE ZIP CODE
CONTRACT PRICE $ ~ D
1. TVPE Ground❑ Wall❑ ProieclinpU OtMr SaDFOCe
2. MATERIAL Totol Squon FoN
SIGNS 3. ILIUMINATION Yes❑ No❑ Typa
4 SET BACK FROM PROPERTY LINE N_ 5__ E_ j
(SVecifYwhichiatront) ❑ ❑ ❑ INSPECTION TICKET
1. TYPE SolidO Mon TMn 80% Open[] Ln. JOB
Y. MATERIAL ADDRESS 3 U d
fENCES 3 SET BACN FROM PROPERTY LINE N_ 5_ E_
(Specify which ie tront) ❑ ❑ ❑
OTHER IZ'
3.
DATE: BLDG. PERMITM 3 FS,T-
DRAW SKETCH OR SHOW BELOW,THE FENCE,SIGN,OR OTHERSTRUCTURE gLDG
(SETBACKS OR PROJECTIONS INCLUDED)
PERMIT FEE
SUBCONTRACTOR
DATE INSP. REQ._ v" a~ V -V
TYPE OF INSR
INSPECTION MADE ! Z
REMARKS
STREE? NAME
SHOW DISTANCES FROM THE MAIN BUILDING TUAWOINING HOUSES, STRE W.R.FORM &79
DISTANCE TO PROPERTY LINES, NOT MAXIMUM OR AVERAGE DiSTANi
k.`r'pLiCATIJN FOR PLUM8ING; ELEC
THIS APPLICATION WILL BECOME A PERMIT TO PERFORM THE INDICATEO
F'ERASlT S4il.L EXGIRE 60 DAYS FROM 0.5'PE OF IS$UANi,c :r -
SION.
ELECTRICAL PERMIT
STATE LICENSE N0.
PLUMBING PERMIT
STATE UCENSE N0.
MECHANICAL PERMIT
~,lil~rti~~t;~"F.~REU'~DFRSIY.E31LlEGAL
FLOOR
BSM
IST
2ND
3R0
4TH
NQ
ROPa~ EI*eSola
FLEVCirtleOneCoF d1
11
Np.
WATER CLDSET
FORCED AIR - BTU
TEMPORARY METER
WASH BOVIL
HOT WATER - BTU
NEW SERVICE - AMPS
CHANGE SERVICE-AMPS
LIGHTING
BATH TUB
SMOWER
SINK
STEAM - BTU
AIR CONDITIONING-BTU • O DO
OTHER
HEATING
GARBAGE DIS?
REFRIGERATpN SYSTEM
POWER SUB-GFCUITS
UTiUTY(RANGE,DISPOSER,ETC)
FIXTURES
WATER HEATER
AUTO. WASHER
DISH WASHER
Refri sroM Gou
Pounds Ch0f •
AUTOMATIC SPRINKLER SYSTEM
WIRING MOTORS 6 CONTROLS
FLDOR DRAIN
ELEVATOR
SIGNS
URINAL
TRANSFORMERS 9 RECTFIERS
SEWERS
ADDITION TO OLD WORK
OTHER
MOTORS OVER I HP
TOTAI FIXTURES
I hareby acknowlsdqe fhat Ihia ap0liCo-
tion is eorrect ond understand thaf I
eannot atarf this projeet uniil this appli-
cofion is aDProveA. I shall tomply with
iha lows ot the Stote of Colorado and to
}hs ZoninQ Fepufationa ond Builtlinp
Code of the City of Wheai Ridqe. Any
violafion of the abovs terme will cause
immediate ravoootion of this permit.
t
1011i onlt i0na~m~
USE TAX
PERMITM
CONTR._
•oQ
I TOTAL FEE I$ 5J •L9D I
CHIEF BUILDING
,Cityaf Wheat Ridge
Dote Issued ~
1
NOT VALID UNLESS RECEIPTED
lw4gaP c% 1-79O
pS . ob~1
CAL1237-8944 EXT.255
24 HOURS IN ADVANCE
FORINSPECTIONS
tnf ~
o~
m
N 7
W n
A p
~
~
tD N
W C7
o
W O
7
. N
3
~ m
6
N
7
C1
a
m
n
0
~
~
N
\ 9
<D
~ ci
0
~
~
~
L
O
Q
a
a
~
A
N
N
~
`I
r~
"t
~
`I
~
0
7
~
5
N
'0
(D
0
W =
0
w
N
w
~
N
~
~
~
n
~
n
0
~
Z
m
C
m
r
~
~
~
•v
m
~
~
n•
m
N
v
,
_
0
~