Loading...
HomeMy WebLinkAbout3001 Sheridan Boulevardi CITY!& WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 3 Job Address: Permit Number: ❑ No one available for inspection: Tim PM Re -Inspection required: Yes ( No When corrections have been made catfor e-inspectiop at 3Q3 X34 Dat - Inspe,- DO NOT REIIIIOVE THIS NOTICE i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Job Address:."`� Permit Number: 'Z-(;=' ❑ No one available for inspection: T6 Re -Inspection required: (e No When corrections have been made, call r r ar►specVv ait3B3=234n5933 Date"7_ ' -f 9 Inspecto DO NOT RENI/E THIS NOTICE i_ CITY OF VVHEAT RIDGE � Building Inspection Division (303) 234-5933 Inspection line ��'(303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: `F/0, Job Address: 7j,4i� Permit Number: ❑ No one available for inspection: Time°`/PM Re -Inspection required: Yes N *When corrections have been made, all for re -inspection at 303-234-5933 Dater' Q- ):3f Inspector: DO NOT REMOVE THIS NOTICE rti i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: Job Address: `�' "%�% ''✓ !fir"�'1--� L_, Permit Number:`"%/�L� ❑ No one available for inspection: TirnecK, MM Re -Inspection required: Yes-, No../ When corrections have been made, call for re -inspection at 303-234-5933 Date:(---, P, Inspector: DO NOT REMOVE THIS NOTICE *** CONDITIONS *** Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be required for both the midroof and final inspections. The 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec. R806. The installation of ridge venting requires the installation or existence of soffit venting. For calculation purposes, one hat or turtle vent equal to one-half of one square foot of opening. Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75% of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75% of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201901291 PERMIT NO: 201901291 ISSUED: 06/21/2019 JOB ADDRESS: 3001 Sheridan Blvd EXPIRES: 06/20/2020 JOB DESCRIPTION: Replace asphalt shingles, 4/12 pitch, 24 squares *** CONTACTS *** OWNER (303)233-1992 ANDERSEN ROBERT MOHAN SUB (303)761-6400 J. BRETZ 018118 EXCEL ROOFING, INC. *** PARCEL INFO *** ZONE CODE: - UA / Unassigned USE: R-3 / Residential SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 12,000.00 FEES Total Valuation 0.00 Use Tax 252.00 Permit Fee 236.00 ** TOTAL ** 488.00 *** COMMENTS *** *** CONDITIONS *** Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be required for both the midroof and final inspections. The 3rd party inspection report AND THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat Ridge. The report MUST BE SIGNED by the Homeowner. REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec. R806. The installation of ridge venting requires the installation or existence of soffit venting. For calculation purposes, one hat or turtle vent equal to one-half of one square foot of opening. Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75% of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75% of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on at the time of final inspection. City of Wheat Ridge Residential Roofing PERMIT - 201901291 PERMIT NO: 201901291 ISSUED: JOB ADDRESS: 3001 Sheridan Blvd EXPIRES: JOB DESCRIPTION: Replace asphalt shingles, 4/12 pitch, 24 squares 06/21/2019 06/20/2020 I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorize? to obtain this permit and perform the work described and approved in conjunction with this ermrt. I further attest that I am Iegally authorized to include all entities named within this document as parties to the work toe performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date I . This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original pennit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Offipcial and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 5, The issuance or granting of a permit shall not be construed to be a permit for or an approval of, any violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building'OfMal ""' Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. qo )--q Kimberly Cook 1� � l From: no-reply@ci.wheat ridge.co.us Sent: Friday, June 21, 2019 12:35 PM To: CommDev Permits Subject: Online Form Submittal: Residential Roofing Permit Application Residential Roofing Permit Application This application is exclusively for new RESIDENTIAL roofing permits and for licensed contractors only. Permits are processed and issued in the order they are received. You will be notified if your contractor's license or insurance has expired. The license and insurance must be current before the permit will be processed. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. The Building Division permit counter is open from 7:30 am to 3:30 pm, Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a RESIDENTIAL reroof permit? How many dwelling units are on the property? Yes Single Family Home PROPERTY INFORMATION Property Address Property Owner Name Property Owner Phone Number (enter WITH dashes, eg 303-123-4567) Property Owner Email Address 3001 Sheridan Blvd Robert & Sherry Andersen 303-233-1992 Field not completed. Do you have a signed Yes contract to reroof this property? CONTRACTOR INFORMATION Contractor Business Excel Roofing, Inc Name Contractor's License 018118 Number Contractor Phone 303-761-6400 Number (enter WITH dashes, eg 303-123-4567) Contractor Email Address excel@excelroofing.com Retype Contractor Email excel@excelroofing.com Address REQUIRED: Credit Card Wheat Ridge CC.pdf Authorization Form DESCRIPTION OF WORK TOTAL SQUARES of 24 the entire scope of work: Project Value (contract 12000.00 value or cost of ALL materials and labor) Are you re -decking the No roof? Is the permit for a flat Pitched roof (2:12 pitch or greater) roof, pitched roof, or both? (check all that apply) What is the specific pitch 4/12 of the PITCHED roof? How many squares are 24 part of the PITCHED roof? Describe the roofing Owens Corning Duration Storm materials for the PITCHED roof: 2 Type of material for the Asphalt PITCHED roof: Provide any additional House detail here on the description of work. (Is this for a house or garage? Etc) SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. 3 Person Applying for Norma Navarro Permit Email not displaying correctly? View it in your browser. Citi of Wheat Ridge Residential Solar PERMIT - 201901169 PERMIT NO: 201901169 ISSUED: 06/11/2019 JOB ADDRESS: 3001 Sheridan Blvd EXPIRES: 06/10/2020 JOB DESCRIPTION: Install PV solar system, 4.8 kw; 16 modules, no structural required *** CONTACTS *** OWNER (303)233-1992 ANDERSEN ROBERT MOHAN *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: R-3 / Residential SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 10,116.00 FEES Total Valuation 0.00 Residential Solar 500.00 ** TOTAL ** 500.00 *** COMMENTS *** *** CONDITIONS *** Approved per plans and red -line notes on plans. Must comply with 2012 IRC, 2017 NEC and all applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections. I by my signature do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with thispermrt. I further attest that I am legally authorized to include all entities named within this document as partes to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications. Signature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in thepermit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the original permit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new pen -nit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired pen -nits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all re uired inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or gfanting of a p"it ll not be construed to be a permit for, or an approval of, any violation of any provision of any applicable cod" an�dmalation of this jurisdiction. Approval of work is subject to field inspection. evv. a Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. City of CoMmuNiTy DEVELOPMENT Building & Inspection Services 7500 W. 2911 Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permits@ci.wheatridge.co. us FOR OFFICE USE ONLY Date: 0/ 7//? Plan/Permit # 900 olib7 Plan Review Fee: 4So() v 3 Building Permit Application *** Complete all applicable highlighted areas on both sides of this form. Incomplete applications may not be processed. *** Property Address: 3001 Sheridan Boulevard, Wheat Ridge, Colorado, 80214, United States Property Owner (please prino: Bob Andersen Phone: 3038106104 Property Owner Email: bobandersen251@hotmail.com Tenant Name (Commercial Projects Only) Property Owner Mailing Address: (if different than property address) Address: City, State, Zip: Architect/Engineer: Architect/Engineer E-mail: Contractor Name: BRS Field Ops LLC City of Wheat Ridge License #: 180271 Phone: Phone: Contractor E-mail Address: permitting.department@blueravensolar.com For Plan Review Questions & Comments (please print): 385-482-0045 CONTACT NAME (please print): Justin Mack Phone: 385-482-0045 CONTACT EMAIL(p/ease print): permitting.department@blueravensolar.com Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form): Electrical: Plumbing: Mechanical: W.R. City License # W.R. City License # W.R. City License # Other City Licensed Sub: Other City Licensed Sub: City License # City License # Complete all highlighted fields. ❑COMMERCIAL D RESIDENTIAL Provide description of work: For ALL projects, provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc. Residential Solar Rooftop PV System 4.8 kW SCOPE OF WORK INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM 4.8 kW DC PHOTOVOLTAIC SOLAR ARRAY ROOF TYPE: Comp Shingle MODULES: (16) Trinasolar 300 TSM-DD05A.05(II) INVERTER(S): Enphase IQ7-60-2-US,--- RACKING: Unirac Sunframe Microrail Sq. Ft./LF BTUs Gallons Amps Squares For Solar: 1(1N # of Panels l Requires Structural /t,� For Commercial Projects Only: Occupancy Type: Construction Type: Occupancy Load: Square Footage: Project Value: (Contract value or the cost of all materials and labor included in the entire project) $ 10116 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLEONE. (OWNER) (CONTRACTOR) or (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR) For BRS Field Ops LLC 06/06/2019 SiEnature (first and last name): Justin Mack Printed Name: ZONING COMMMENTS: Reviewer: BUILDI G PARTMENT COMMENTS Revie ec ,.��,... cc . PUBLIC WORKS COMMENTS: Reviewer: DEPARTMENT USE ONLY DATE: OCCUPANCY CLASSIFICATION: CONSTRUCTION TYPE: Building Division Valuation: T ! C TI,- T A L =-NTGINEiT•G LLC June 5, 2019 To: Blue Raven Solar 1403 North Research Way, Building J Orem, UT. 84097 Subject: Certification Letter Andersen Residence 3001 Sheridan Blvd. Wheat Ridge, CO. 80214 To Whom It May Concern, Domus Structural Engineering, LLC P.O. Box 6986 Broomfield, CO 80021 530-864-7055 Domusstructural@gmail.com Digitally signed by John Calvert Date: 2019.06.05 11:11:46 -0600' Ajobsite observation of the condition of the existing framing system was performed by an audit team of Blue Raven Solar as a request from Domus Structural Engineering. All review is based on these observations and the design criteria listed below and only deemed valid if provided information is true and accurate. On the above referenced project, the roof structural framing has been reviewed for additional loading due to the installation of the solar PV addition to the roof. The structural review only applies to the section of the roof that is directly supporting the solar PV system and its supporting elements. The observed roof framing is described below. If field conditions differ, contractor to notify engineer prior to starting construction. The roof structure of (MP1) consists of composition shingle on 1x decking that is supported by 2x6 rafters @ 16"o.c. with ceiling joists acting as rafter ties. The rafters have a max projected horizontal span of 8'-0", with a slope of 23 degrees. The rafters are connected at the ridge to a ridge board and are supported at the eave by a load bearing wall. The existing roof framing system of (MP1) is judged to be adequate to withstand the loading imposed by the installation of the solar panels. No reinforcement is necessary. The spacing of the solar standoffs should be kept at 64" o.c. for landscape and 48" o.c. for portrait orientation, with a staggered pattern to ensure proper distribution of loads. The scope of this report is strictly limited to an evaluation of the fastener attachment, underlying framing and supporting structure only. The attachment's to the existing structure are required to be in a staggered pattern to ensure proper distribution of loading. All panels, racking and hardware shall be installed per manufacturer specifications and within specified design limitations. All waterproofing shall be provided by the manufacturer. Domus Structural Engineering assumes no responsibility for misuse or improper installation of the solar PV panels or racking. Note: Seismic check is not required since Ss<.4g and Seismic Design Category (SDC) < B Design Criteria: • Applicable Codes = 2012 IBC/IRC, ASCE 7-10 City of • Roof Dead Load = 9 psf (MP1) • Roof Live Load = 20 psf • Wind Speed = 135 mph (Vult), Exposure C, Risk Category II ,N�oQt�g�d9® • Roof Snow Load = 30 psf Cy}�tis�oA • Attachments: 1- 5/16" dia. lag screw with 2.5 inch min embedment depth, at spacing shown above. Please contact me with any further questions or concerns regarding this project. Sincerely, John Calvert, P.E. Project Engineer Andersen Residence, Wheat Ridge, CO 1 Domus Structural Engineering, LLC o _m v5, P.O. Box 6986 Broomfield, CO 80021 S T R F, C T t , N L530-864-7055 -E r Gx T N F E R I N 0, T. L to Domusstructural@gmail.com Gravity Loading Roof Snow Load Calculations 3.26 psf p9 = Ground Snow Load = 30 psf pf = 0.7 Ce Ct I p9 (ASCE7 - Eq 7-1) Ce = Exposure Factor = 1 (ASCE7 - Table 7-2) C, = Thermal Factor = 1 (ASCE7 - Table 7-3) 1= Importance Factor = 1 pf = Flat Roof Snow Load = 30.0 psf ps = Cspf (ASCE7 - Eq 7-2) Cs = Slope Factor = 1 ps = Sloped Roof Snow Load = 30.0 psf PV Dead Load = 3 psf (Per Blue Raven Solar) DL Adjusted to 23 Degree Slope 3.26 psf PV System Weight 3.00 Weight of PV System (Per Blue Raven Solar) 3.0 psf X Standoff Spacing = 4.00 ft Y Standoff Spacing = 5.50 ft Standoff Tributary Area = 22.00 sft Point Loads of Standoffs 66 Ib Note: PV standoffs are staggered to ensure proper distribution of loading Roof Live Load = 20 psf Note: Roof live load is removed in area's covered by PV array. Roof Dead Load (MPI) Composition Shingle 4.00 1x Decking 3.00 2x6 Rafters @ 16"o.c. 1.72 Vaulted Ceiling 0.00 (Ceiling Not Vaulted) Miscellaneous 0.28 Total Roof DL (MPI) 9.0 psf DL Adjusted to 23 Degree Slope 9.8 psf C:1W of wheat 9i690 SA 9 'pe Andersen Residence, Wheat Ridge, CO 2 0X1 IT Domus Structural Engineering, LLC P.O. Box 6986 Broomfield, CO 80021 530-864-7055 Domusstructural@gmail.com Wind Calculations Per ASCE 7-10 Components and Cladding Input Variables Wind Speed 135 mph Exposure Category C Roof Shape Hip/Gable Roof Slope 23 degrees Mean Roof Height 15 ft Effective Wind Area 193 ft Design Wind Pressure Calculations Wind Pressure P = qh*G*Cn qh = 0.00256 * Kz * Kzt * Kd * V^2 (Eq. 30.3-1) Kz (Exposure Coefficient) = 0.85 (Table 30.3-1) Kzt (topographic factor) = 1 (Fig. 26.8-1) Kd (Wind Directionality Factor) = 0.85 (Table 26.6-1) V (Design Wind Speed) = 135 mph (Fig. 26.5-1 A) Risk Category= II (Table 1.5-1) qh = 33.71 0.6 * qh = 20.23 Standoff Uplift Calculations -Portrait Zone 1 Zone 2 Zone 3 Positive GCp = -0.84 -1.39 -2.23 0.38 (Fig. 30.4-1) Uplift Pressure = -16.95 psf -28.11 psf -45.06 psf 12.7 psf X Standoff Spacing = 4.00 4.00 2.67 Y Standoff Spacing = 5.50 2.75 2.75 Tributary Area = 22.00 11.00 7.33 Footing Uplift = -373 Ib -309 Ib -330 Ib Standoff Uplift Calculations -Landscape Zone 1 Zone 2 Zone 3 Positive GCp = -0.84 -1.39 -2.23 0.38 (Fig. 30.4-1) Uplift Pressure = -16.95 psf -28.11 psf -45.06 psf 10.0 psf (Minimum) X Standoff Spacing = 5.33 5.33 3.56 Y Standoff Spacing = 3.50 1.75 1.75 Tributary Area = 18.67 9.33 6.22 Footing Uplift= -316 lb -262 lb -280 lb Standoff Uplift Check Maximum Design Uplift = -373 Ib Standoff Uplift Capacity = 450 Ib City of 450 Ib capacity > 373 Ib demand Therefore, OK Wheat Ridge Fastener Capacity Check Building Division Fastener = 1 - 5,116" dia. lag Number of Fasteners = 1 Embedment Depth = 2.5 Pullout Capacity Per Inch = 250 Ib Fastener Capacity = 625 Ib w/ F.S. of 1.5 & DOL of 1.6= 667 Ib 667.2 Ib capacity > 373 Ib demand Therefore, OK Andersen Residence, Wheat Ridge, CO 3 o t . S" Domus Structural Engineering, LLC P.O. Box 6986 Broomfield, CO 80021 530-864-7055 - ; t g T N E F R "T 3"'+ G T T. C Domusstructural@gmail.com Framing Check (MP1) PASS w = 57 plf Dead Load 9.8 psf PV Load 3.3 psf Snow Load 30.0 psf 2x6 Rafters @ 16"o.c. Governing Load Combo = DL + SL Member Span = 8'- 0" Total Load 43.0 psf Member Properties Member Size S (in ^3) 1 (in^4) Lumber Sp/Gr Member Spacing 2x6 7.56 20.80 DF#2 @ 16"o.c. Check Bending Stress Fb (psi) = fb x Cd x Cf x Cr (NDS Table 4.3.1) 900 x 1.15 x 1.3 x 1.15 Allowed Bending Stress = 1547.3 psi Maximum Moment = (wL^2)/8 = 459.0541 ft# = 5508.65 in# Actual Bending Stress = (Maximum Moment) / S = 728.5 psi Allowed > Actual -- 47.1% Stressed -- Therefore, OK Check Deflection Allowed Deflection (Total Load) = U180 (E = 1600000 psi Per NDS) = 0.533 in Deflection Criteria Based on = Continuous Span Actual Deflection (Total Load) _ (w*L^4) / (185*E*I) = 0.066 in = L/1455 > L/180 Therefore Cls Allowed Deflection (Live Load) = Actual Deflection (Live Load) = U240 0.4 in (w*L^4) / (185*E*I) 0.046 in 02087 > L/240 Therefore OK A Check Shear G,1" of Member Area= 8.3 in 2 Fv (psi) = 180 psi (NDS Table 4A) e Allowed Shear = Fv * A = 1485 Ib Max Shear (V) = w * L / 2 = 230 Ib SR%d9 Allowed > Actual •-15.5"1 Stressed -- Therefore, OK ��tcaa Andersen Residence, Wheat Ridge, CO 4 GENERAL NOTES AERIAL VIEW CODES AND STANDARDS .... . . ..... . .... . . . . . . ........ . ..... 1. ALL WORK SHALL COMPLY WITH 2017 NATIONAL ELECTRIC CODE (NEC), 2015 INTERNATIONAL RESIDENTIAL CODE (IRC), 2015 INTERNATIONAL BUILDING CODE (IBC), 2015 BLUE RAVEN INTERNATIONAL PLUMBING CODE (IPC), AND ALL STATE AND LOCAL BUILDING, ELECTRICAL, AND PLUMBING CODES, 2. DRAWINGS HAVE BEEN DETAILED ACCORDING TO UL LISTING REQUIREMENTS. 1403 N RESEARCH WAY, BUILDING J 3. TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS (WHEN PROVIDED) IN ACCORDANCE WITH NEC CODE 110.14(D) ON ALL OREM. U F 84097 ELECTRICAL CONNECTIONS. 800-377-4480 SITE NOTES I OSHA REGULATION ',,',!',t,,At,/.BLUERAVENSOLAR.COM CONFIDENTIAL - THE INFORMATION 1. A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 2. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS AN UTILITY HEREIN CONTAINED SHALL NOT BE INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. USED FOR THE BENEFIT OF 3. THE SOLAR PV INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL I BUILDING ROOF VENTS. t BE DISCLOSED IN WHOLE OR IN 4. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, COVERING SHALL SERVE TO PROTECT THE BUILDING OR STRUCTURE. EXCEPT IN CONNEC TIONVOTH THE SALE AND USE OF THE RESPECTIVE EQUIPr,1ENI,V,,'IIHOUT THE SOLAR CONTRACTOR VVRITfEN PERMISSION OF BLUERAVENSOLAR LLC. 1. MODULE CERTIFICATIONS WILL INCLUDE UL1703; IEC61646, IEC61730. 2. IF APPLICABLE, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE MARKED GROUNDING LUG HOLES PER THE MANUFACTURERS INSTALLATION REQUIREMENTS, 3. AS INDICATED BY DESIGN, OTHER NRTL LISTED MODULE GROUNDING DEVICES MAY BE USED NABCEP IN PLACE OF STANDARD GROUNDING LUGS AS SHOWN IN MANUFACTURER DOCUMENTATION LCERT FIED AND APPROVED BY THE AHJ. PV INSTALLATION 4. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND PROFESSIONAL ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. a. 5, CONDUIT POINT OF PENETRATION FROM EXTERIOR TO INTERIOR TO BE INSTALLED AND Scott Gurney PV-01 1719-015866 SEALED WITH A SUITABLE SEALING COMPOUND. CONTRACTOR: 6. DC WIRING LIMITED TO MODULE FOOTPRINT VV/ ENPHASE AC SYSTEM. 7. ENPHASE WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY VVIBRS FIELD OPS SUITABLE WIRING CLIPS. 8. MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR 385A98.6700 VOC UNLESS NOT AVAILABLE- 9- ALL INVERTERS, MOTOR GENERATORS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AC PHOTOVOLTAIC MODULES, DC COMBINERS, DC-TO-DC CONVERTERS, SOU RCE CIRCUIT COMBINERS, AND CHARGE CONTROLLERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (B). 10. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. C\j C:) EQUIPMENT LOCATIONS 1. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED _0 00 -he ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION [NEC 110.26]. cu 0 00 > 2. EQUIPMENT INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING z DESIGN CRITERIA SITE SPECIFICATIONS SHEET TEMPERATURE AS SPECIFIED BY [NEC 690,31 (A,)-(B,)] AND [NEC TABLE 310.15 (B)I, 0 L 3. ADDITIONAL AC DISCONNECTS SHALL BE PROVIDED WHERE THE INVERTER IS NOT ADJACENT ASCE 7 WIND SPEED: 120 MPH OCCUPANCY - R3 PV1 - COVER SHEET 0 -2 F_ CC 0 N < C) TO THE UTILITY AC DISCONNECT, OR NOT WITHIN SIGHT OF THE UTILITY AC DISCONNECT, C: CO 4. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING GROUND SNOW LOAD: 30 PSF CONSTRUCTION - V-B PV2 - PROPERTY PLAN Ctij TO NEC APPLICABLE CODES. EXPOSURE CATEGORY: C ZONING: RESIDENTIAL PV3 - SITE PLAN Ir- (n 70 CM 0 - " -0 Uj 5 ,, ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE SEISMIC DESIGN CATEGORY: B PV4 - EQUIPMENT & ATTACHMENT DETAIL L.L 0 i2 -0 WHENAPPROPRIATE. z = PV5 - ELECTRICAL SINGLE LINE DIAGRAM U) < M CAY of SCOPE OF WORK PV6 - ELECTRICAL CALCULATIONS & Uj -0 0 CD� C) 0 ELECTRICAL NOTES APPROVED INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM PV7 - MAIN BREAKER DEBATE CALLS. DRAVVNG BY (IF NEEDED) Kate Petersen Reviewed for _CWk Complie 4.8 kW DC PHOTOVOLTAIC SOLAR ARRAY PV8 - LABELS & LOCATIONS Ir ROOF TYPE: Comp Shingle MODULES: (16) Trinasolar 300 TSM-DD05A.05(11) PV9 - CUSTOM DIRECTORY PLACARD (IF NEEDED - NEC 690.56(B)) DATE June 5, 2019 INVERTER(S): Enphase 107-60-2-US,---- PROJECT W.-NIBER Mans f.arnint'f pMe RACKING: Unirac Sunfranne Microrail 62537179 : TAC -v—,r of PC~ or Approva ofpb. softow'" Notes: an= d"IWQIAOM 5hoNAW be a pe—iffo,; or on*AwvvaIt WW�j�&.jjm t, SHEET NMOE my Of dW Pfow�on% ofthe ft"no code ot of ony Cay oswkwam. ft min 1)Verify or provide supplemental ground rod or COVER SHEET prc-"*Vtopiwr0—kytow0weoftancNtoww0wimm elift awksw rods per 2017 NEC Art. 250.53(A)(2). 4"ff of other cr&w*res of the ctry ow not he wlt0 2) Natural Gas piping to be bonded s per 2017 NEC PAGE NUMBER REVISION Art. 250.104(B). PV 0 3 )Bond P/V panels to the building Grounding ­­1VUU �YbLtV I I per zui I IN 1:1- Art. byU(A). LEGEND EINVERTER & DC DISCONNECT BLUE RAVEN SUB (E) SUBPANEL LC (N) LOAD CENTER 1403 N RESEARCH ;-JAY. BUILDING J OREM, UT 84097 AC AC DISCONNECT 800-377-4480 4,"PN'Oi.BLUERAVENSOLA.R.COt,,I UTILITY PNKETER/SERVICE PANEL CONFIDENTIAL. - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF I I E]JUNCTION BOX ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT 130'-5" BE DISCLOSED IN WHOLE OR IN COMBINER BOX PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TIONV,,fITH THE PV PV REVENUE METER SALE AND USE OF THE RESPECTIVE EQUIPMENT. 4-,,'ITHOLT THE N %AJRrrTEN PERMISSION OF 0 C 0 FIRE SETBACK BLUERAVENSOLAR LLC, 0 0 AC 0 777 EMT CONDUIT RUN PV 0 (10 BE DETERMINED IN FIELD) NABCEP msp -00 0 F—CERTIFIED PV WIFE STRING MPV INSTALLATION JB PROFESSIONAL Scott Gurney PROPERTY LINE PV-01 1719-015866 57' MP1 # OF MODULES: 16 SCALE: 1/16" V-0" CONTRACTOR: BRS FIELD OPS AZIMUTH:180' PITCH :23' 385.498.6700 TSRF:93% AREA: 733 SQ. FT FRONT OF HOME cat C:) -2 Co to 0 Co z Q) CU > -0 4 3001 Sheridan Boulevard 0 :3 m0 -2 L 0 N < U) 2E Crcry(D 0 Lij LL z < U) C) cn m 0 ® 0 (y) DRAWING BY amity 01 Kate Petersen N000009 D4,TE June 5, 2019 DC SYSTEM SIZE: 4.8 kW DC 62537179 ROOF TYPE: Comp Shingle SHEETINAME (16) Trinasolar300TSM-DD05A.05(li) PROPERTY PLAN Enphase IQ7-60-2-US, ---- INVERTER P=37- NUMBER REVISION PV2 0 LEGEND INVERTER & DC DISCONNECT BLUE RAVEN SUB (E) SUBPANEL (N) LOAD CENTER 1403 N RESEARCH SEARCH WAY. BUILDING JOREM. UT 84097 AC AC DISCONNECT 800-377-4480 VW1W.BLUERAVENSCLAR.COM UTILITY METER 1; SERVICE PANEL CONFIDENTIAL. -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF EJUNCTION BOX ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN V,JHOLE OR IN I—COMBINER BOX PART TO OTHERS OUTSIDE C I RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE PV PV REVENUE METER SALE AND USE OF THE RESPECT IVE EQUIPMENT, V',11THOUT THE WRITTEN PERI'vIISSION OF CHIMNEY N FIRE SETBACK BLUERAVENSOLAR LLC. C EIVIT CONDUIT RUN 0 0 (TO BE DETERMINED IN FIELD) /NABCEP\ AC 0 PV WIRE S TRING I CERTIFIED PV 0 PV INSTALLATION PROFESSIONAL 0 ooPROPERTY LINE Scott Gurney MSP 0 # PV -01 1719-015666 M SCALE: 3/32" = 1'-0" CONTRACTOR: 4 BRS FIELD OPS 385.498.6700 151-711 MI I #OF MODULES: 16 AZIMUTH:180' Sealed For PITCH:23' 0 Existing Roof & -2 00 61'-4" TSRF:93% CU 0 00 AREA: 733 SQ. FT Attachment Only z > a) 64'-11 0 -5 0 -2 L U) Cr (D W FRONT OF HOME LL 0 zU) C U) < w 0 0 0 W co M *9 43019 �i DRANING BY ok Kate Petersen 0% V10gp -1 DATE June 5, 2019 0 W.xs'p Digitally signed by John C PROJECT NLAIIBER Date: 2019.06.0511:12:47- 0' 62537179 DC SYSTEM SIZE: 4.8 kW DC ROOF TYPE: Comp Shingle SHEET NAME SITE PLAN (16) Trinasolar 300 TSM-DD05A.05(il) Enphase IQ7-60-2-US ----- INVERTER PAGE NUMBER R-VlSiON PV3 0 w 1 w w t � w • H LL O ❑ Z Q _ f- o O �m O mM U J V) Q F - w LL LL O Z F�- U) D_ o O w II J - ❑ (y) ❑ 6 :�E m C) J W I PV MODULE COUNT: 16 MODULES OF ATTACHMENT POINTS: 28 ARRAY AREA: Module Count x 17.51ft2 = 280.2ft2 ROOF AREA: 2169.0ft2 % OF ARRAY/ROOF: 12.9% ARRAY WEIGHT: Module Count x 501bs = 800.01bs DISTRIBUTED LOAD: Array Weight _ Array Area = 2.86 lbs/ft' POINT LOAD: Array Weight _ Attachments = 28.6lbs/attachment game Microrail [MRAIL Trinasolar 300 TSM-DD05A.05(II) PV MODULE (E) ROOF MEMBRANE UNIRAC SLIDERS AND TRIMRAIL ROOF ATTACHMENTS FLASHING 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER (E) BUILDING STRUCTURE Unirac Sunframe Microrail Trinasolar 300 TSM-DD05A.05(II) PV MODULE (E) ROOF MEMBRANE UNIRAC SLIDERS FLASHING 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER (E) BUILDING STRUCTURE PV MODULE (BEHIND TRIM RAIL) I MAX' - 64" MAX. - - Unirac Sunframe Microrail TRIM RAI! 4 !LANDSCAPE SFM Raised Seal Flashing RACKING ATTACHMENTS TO BE Unirac Sunframe Microrail FRAME STAGGERED BY SHIFTING EACH SUBSEQUENT ROVJ OF ATTACHMENTS �\ ONE RAFTER OVER. f ! PV4 PORTRAIT ARRAY DETAIL, FRONT VIEW Scale: 3/8" = V-0" PORTRAIT LANDSCAPE ZAY DETAIL; SIDE VIEW Scale: 3/8" = V-0" "O! • Shingle RAFTER OR TOP CHORD(TRUSS) 2x6 @ 16"O.C. CEILING JOIST OR BOTTOM CHORD(TRUSS) 2x6 @ 16"O.C. ■I Sealed oI I Existing Roof i :Attachment y John Calvert Date: 2019.06.05 11:12:59 -06100' BLUE RAVEN 1403 N RESEARCH'lAY. BUILDING J OREM, UT 84097 800.377.4480 VV`71M✓. BLUERAVEN SOLAR. CONI CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE. USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN VdHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION'VVITH THE SALE AND USE OF THE RESPECTIVE EQUIPtAENT;'WITHOUT THE WRITTEN PERMISSION OF BLUERAVENSOLARLLC. IACEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 DATE t.• June 5, 2019 ryh0Qf R, PROJECT NU;IBE.R It a 62537179 SHEET NAME — EQUIP. DETAIL . GE NUMBE., R'Vi:"CN PV4 0 U r ❑ 0 -0 M U 00 Z N 4�6 ® 0 N U) ® Cn0 L L L/ W U) Ziz Lij U) o U) co ❑ DRAWING B Kate Petersen DATE t.• June 5, 2019 ryh0Qf R, PROJECT NU;IBE.R It a 62537179 SHEET NAME — EQUIP. DETAIL . GE NUMBE., R'Vi:"CN PV4 0 (1) 10 AWGTHHN/THWN-2, CU., BLACK (Ll) 16.0 A AC (1) 10 - 2 OF -B W/G, THHN/THWN-2, SOLID CU. MAX 16.0 A A (1) 10 - 2 OF -B W/G, THHN/THWN-2, SOLID CU. MAX 16.0 AA (1) 12-2TC-ER,THWN-2, CU. MAX 16.0 A AC 15 (1) 10 AWGTHHN/THWN-2, CU., RED (1-2) 240 V AC 3 240 V AC 2 240 V AC 1 (1) 6 AWG BARE, CU (EGC) 240 V AC (1) 10 AWGTHHN/THWN-2, CU., WHITE (N) New— (1) 10 AWG TH H N/THWN -2, CU., GREEN (EGC) (1) 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT EXTERIOR INTERIOR EXTERIORBLUE RAVEN 1. ALL CONDUIT TO BE RAN AT LEAST 7/8" ABOVE ROOF SURFACE WHERE EXPOSED TO SUNLIGHT, 2. TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS (WHEN PROVIDED) IN ACCORDANCE WITH NEC CODE 110.14(D) ON ALL ELECTRICAL CONNECTIONS. 3, CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. (E)200A MAIN SERVICE PANEL (E)200A / 2P MAIN BREAKER (E) (E)200A / 2P (E)LOADS (N)20A/2P N 120/240 VAC F 60HZ TO UTILITY GRID I I I G UTILITY PV PRODUCTION METER 200A LEVER BYPASS METER SOCKET PV BREAKER TO BE LOCATED OPPOSITE END OF BUSSING FROM MAIN BREAKER (E) GROUNDING ELECTRODE (S) Notes: 1)Verify or provide supplemental ground rod or rods per 2017 NEC Art. 250.53(A)(2). 2) Natural Gas piping to be bonded s per 2017 NEC Art. 250.104(B). 3)Bond P/V panels to the building Grounding Electrode System per 2017 NEC Art. 690(A). PV AC DISCONNECT NON-FUSED LOCKABLE, VISIBLE OPEN 30A, 240V. 2 -POLE Enphase IQ Combiner 3 X-10-AMl-240-3 (SOLAR LOADS ONLY) -JUNCTION BOX(S) FOR WIRE SPLICING ONLY - OPTIONAL IF (16) Trinasolar 300 TSM-DD05A.05(II) UL 1703 COMPLIANT (16) Enphase IQ7-60-2-US MICRO INVERTERS UL 1741 COMPLIANT 8 MODULES MAX FOR ALL SUB -BRANCH CIRCUIT(S) TO COMPLY WITH VRISE CALCS (1) CIRCUIT OF 16 MODULES ENPHASE COMBINER BOX WILL BE ACCESSIBLE TO UTILITY COMPANY 24/7 INTERCONNECTION NOTES 1. ONE OF THE METHODS THAT FOLLOWS SHALL BE USED TO DETERMINE THE RATINGS OF BUSBARS AND PANELBOARDS. (a) THE SUM OF 125 PERCENT OF THE INVERTER(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED THE AMPACITY OF THE BUS BAR. (b) WHERE TWO SOURCES, ONE THE UTILITY AND THE OTHER AN INVERTER ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE INVERTER(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR [NEC 705.121. PV Production meter notes: 1. The self-contained metering will be in compliance with the most recent revision of the Xcel Energy Standard; specifically Section 4.11. 2. The PV production meter will be required to have the PV generation wired to the line side terminals (top of meter block). 3. The meter socket for the PV production meter shall be marked with a stamped brass, aluminum, or stainless steel tag, indicating the address including the unit, typically "PV PROD" in accordance with the requirements for "Meter Identification" in Section 4.14.4 of the Xcel Energy Standard. 4. The PV production meter shall be located within ten (10) feet of the existing utility meter. If there is any reason this cannot be accomplished, a site plan showing proposed equipment locations shall be submitted for review. The local meter shop must approve the site plan for application approval; site meetings can be arranged upon request. NOTE TO INSTALLER: The current Placard that we require at the utility meter and AC Disconnect is a yellow with black lettering 1403 N RESEARCH WAY, BUILDING J OREI'A, UT 84097 800-377-4480 VWAN.BLUE RAVENSOLAR.COM CONFIDENTIAL. -THE INFORMATION HEREIN CONTAINED SHALL NOT BE. USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT,V,IITHOU€ THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. ACED CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 p • � i •• i i i! i i i.: • ,, , t • - CO co DRAINING BY Kate Petersen DATE June 5, 2019 PRO.E.,CT r 62537179 SHEET NAME ELEC. 3 LINE DIAD. GE Nur�eEN �:_'✓ISlcra �• PV5 0 MODULE SPECIFICATIONS Trinasolar3UU ISM UUUbA.US(ll RATED POWER (STC) 300 W MODULE VOC 40 V DC MODULE VMP 33 V DC MODULE IMP 9.2 A DC MODULE ISC 9.8 A DC VOC CORRECTION (%/'C) -0.3 °C VMP CORRECTION (%f°C) -0.4 °C SERIES FUSE RATING 15 A DC ADJ. MODULE VOC @ ASHRAE LOW TEMP 44.3 V DC ADJ. MODULE VMP @ ASHRAE 2% AVG. HIGH TEMP 27.5 V DC MICROINVERTER SPECIFICAI IONS EnphaseIQ/-bU-Z-US POWER POINTTRACKING(MPPT) MINIMAX 22 - 48 V DC MAXIMUM INPUTVOLTAGE 48 V DC MAXIMUM DC SHORT CIRCUIT CURRENT 15 A DC MAXIMUM USABLE DC INPUT POWER 350 W MAXIMUM OUTPUT CURRENT 1 AAC AC OVERCURRENT PROTECTION 20 A MAXIMUM OUTPUT POWER 240 W CEC WEIGHTED EFFICIENCY 97% AC PHUIOVULA I IC MUUULE MARKINU (NEC b`!l.SZ) NOMINAL OPERATING AC VOLTAGE 240 V AC NOMINALOPERATING AC FREQUENCY 47- 68 HZAC MAXIMUM AC POWER 240 VA AC MAXIMUM AC CURRENT 1.0 A AC MAXIMUM OCPD RATING FOR AC MODULE 20 A AC DESIGN LOCATION ANDTEMPERATURES TEMPERATURE DATA SOURCE ASHRAE 2% AVG. HIGH TEMP STATE Colorado CITY Wheat Ridge WEATHER STATION SALISBURY WICOMICO CO AP ASHRAE EXTREME LOW TEMP (°C) -14 ASHRAE 2% AVG. HIGH TEMP ('C) 33 SYSTFM FI FCTRICAI gPFCIFICATjnN,; CIR 1 CIR? CIR 3 CIR 4 CIR S CIR 6 NUMBER OF MODULES PER MPPT DC POWER RATING PER CIRCUIT (STC) TOTAL MODULE NUMBER STC RATING OF ARRAY AC CURRENT @ MAX POWER POINT (IMP MAX. CURRENT (IMP X 1.25) OCPD CURRENT RATING PER CIRCUIT MAX. COMB. ARRAY ACCURRENT (IMP) MAX. ARRAY AC POWER 16 4800 VRISE(V) VEND(V) %VRISE IQ7-8 VRISE SEC. 1(MICRO TO JBOX) 28.8 0.93 240.93 16 MODULES 480OW DC 16.0 2D 20 2.03 242.03 0.85% VRISE SEC. 3 (COMBINER BOX TO POI) 5 0.20 240.20 16.0 3840W AC AC VOLTAGE RISE CALCULATIONS DIST (FT) VRISE(V) VEND(V) %VRISE IQ7-8 VRISE SEC. 1(MICRO TO JBOX) 28.8 0.93 240.93 0.39% VRISE SEC, 2 (JBOX TO COMBINER BOX) 50 2.03 242.03 0.85% VRISE SEC. 3 (COMBINER BOX TO POI) 5 0.20 240.20 0.08% TOTAL V RISE AMB. TEMP. AMP. CORRECTION = 0.96 1.32% PHOTOVOLTAIC AC DISCONNECT OUTPUT LABEL (NEC 690.54) AC OUTPUT CURRENT 16.0 A AC NOMINAL AC VOLTAGE 240 V AC GROUNDING NOTES 1. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH [NEC 69047] AND [NEC 250-501 THROUGH [NEC 250-601 SHALL BE PROVIDED. PER NEC, GROUNDING ELECTRODE SYSTEM OF EXISTING BUILDING MAY BE USED AND BONDED TO AT THE SERVICE ENTRANCE, IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, OR IS ONLY METALLIC WATER PIPING, A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT GROUND ROD WITH ACORN CLAMP. 2, THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL (OR INVERTER) IF SMALLER THAN #6 AWG COPPER WIRE PER NEC 250-64B. THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS AT BUSBARS WITHIN LISTED EQUIPMENT PER [NEC 250.640.1. 3. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN #8 AWG AND NO GREATER THAN #6 AWG COPPER AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM. 4. PV SYSTEM SHALL BE GROUNDED IN ACCORDANCE TO [NEC 250.211, [NEC TABLE 250.1221, AND ALL METAL PARTS OR MODULE FRAMES ACCORDING TO [NEC 690.46]. 5. MODULE SOURCE CIRCUITS SHALL BE GROUNDED IN ACCORDANCE TO [NEC 690.421. 6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDED CONDUCTOR TO ANOTHER MODULE. 7. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTIONS POINTS IDENTIFIED IN THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 8. ENCLOSURES SHALL BE PROPERLY PREPARED WITH REMOVAL OF PAINT/FINISH AS APPROPRIATE WHEN GROUNDING EQUIPMENT WITH TERMINATION GROUNDING LUGS. 9. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR DIRECT BURIAL 10. GROUNDING AND BONDING CONDUCTORS SHALL BE COPPER, SOLID OR STRANDED, AND BARE WHEN EXPOSED. 11. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZE ACCORDING TO [NEC 690.451 AND BEA MINIMUM OF #10AWG WHEN NOT EXPOSED TO DAMAGE (#6AWG SHALL BE USED WHEN EXPOSED TO DAMAGE), 12, GROUNDING AND BONDING CONDUCTORS, IF INSULATED. SHALL BE COLOR CODED GREEN (OR MARKED GREEN IF #4 AWG OR LARGER) 13, ALL CONDUIT BETWEEN THE UTILITY AC DISCONNECT AND THE POINT OF CONNECTION SHALL HAVE GROUNDED BUSHINGS AT BOTH ENDS. 14, SYSTEM GEC SIZED ACCORDING TO [NEC 690.471. [NEC TABLE 250.661, DC SYSTEM GEC SIZED ACCORDING TO [NEC 250.1661, MINIMUM #8AWG WHEN INSULATED. #6A'AIG WHEN EXPOSED TO DAMAGE. 15. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH 250.134 OR 250.136(A) REGARDLESS OF VOLTAGE, WIRING & CONDUIT NOTES 1. ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS PURPOSE AND APPROVED FOR THE SITE APPLICATIONS 2. BOLTED CONNECTION REQUIRED IN DC DISCONNECTS ON THE WHITE GROUNDED CONDUCTOR (USE POLARIS BLOCK OR NEUTRAL BAR) 3. ANY CONNECTION ABOVE LIVE PARTS MUST BE WATERTIGHT. REDUCING WASHERS DISALLOWED ABOVE LIVE PARTS, MEYERS HUBS RECOMMENDED 4. UV RESISTANT CABLE TIES(NOT ZIP TIES) USED FOR PERMANENT WIRE MANAGEMENT OFF THE ROOF SURFACE IN ACCORDANCE WITH NEC 110.2,110.3(A -B), 300.4 5. SOLADECK JUNCTION BOXES MOUNTED FLUSH \N/ROOF SURFACE TO BE USED FOR V"DIRE MANAGEMENT AND AS FLASHED ROOF PENETRATIONS FOR INTERIOR CONDUIT RUNS. 6. ALL PV CABLES AND HOMERUN WIRES BE TYPE USE -2, AND SINGLE -CONDUCTOR CABLE LISTED AND IDENTIFIED AS PV WIRE, TYPE TC -Eft, OR EQUIVALENT; ROUTED TO SOURCE CIRCUIT COMBINER BOXES AS REQUIRED 7. ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED ACCORDING TO [NEC CONDUCTOR SIZE CALCULATIONS MICROINVERTERTO MAX. SHORT CIRCUIT CURRRENT (ISC) = 16.0 AAC JUNCTION BOX (1) MAX. CURRENT (ISC X1.25) = 20.0 A AC f CONDUCTOR (TC -ER, COPPER (90°C)) = 12 AWG CONDUCTOR RATING = 30 A AMB. TEMP. AMP. CORRECTION = 0.96 -14 ADJUSTED AMP. = 28.8 > 20.0 JUNCTION BOXTO MAX. SHORT CIRCUIT CURRRENT (ISC) = 16.0 AAC > JUNCTION BOX (2) MAX. CURRENT (ISC X1.25) = 20.0 A AC 0 CONDUCTOR (UF -B, COPPER (60°C)) = 10 AWG CON DUCTO R RATING = 30A N Q CONDUIT FILL DEBATE = 1 0 AMB. TEMP. AMP. CORRECTION = 0.96 ADJUSTED AMP. = 28.8 > 20.0 JUNCTION BOX TO MAX. SHORT CIRCUIT CURRRENT(ISC) = 16.0 AAC p COMBINER BOX (3) MAX. CURRENT (ISC X1.25) = 20.0 A AC LiJ z CONDUCTOR (UF -B, COPPER (60°C)) = 10 AWG W CONDUCTOR RATING= 30 A (/} , CONDUIT FILL DERATE= 1 AMB. TEMP. AMP. CORRECTION = 0.96 ADJUSTED AMP. = 28.8 > 20,0 COMBINER BOX TO INVERTER RATED AMPS = 16.0 A AC MAIN PV OCPD (15) MAX. CURRENT (RATED AMPS X1.25) = 20 A AC CONDUCTOR (THWN-2, COPPER (75-C TERM.)) = 10 AWG Kate Petersen CON DUCTO R RATING = 35A CONDUIT FILL DERATE = 1 AMB. TEMP. AMP. CORRECTION = 0.96 ADJUSTED AMP. = 33.6 > 20.0 690.81 FOR MULTIPLE CONDUCTORS 8. ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE INSTALLED AT LEAST 7/8" ABOVE THE ROOF SURFACE AND DERATED ACCORDING TO [NEC TABLE 310.15 (B)(2)(a), NEC TABLE 310.15(13)(3)(a),& NEC 310.15(13)(3)(C)]. 9. EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE -2. 90°C RATED, WET AND UV RESISTANT, AND UL LISTED RATED FOR 600V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT WIRE FROM SHARP EDGES 10. PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHNITHWN-2 INSULATED, 90°C RATED, WET AND UV RESISTANT, RATED FOR 600V 11. 4 -WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER VOLTAGE TO GROUND MARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE MEANS. 12. ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION 13. VOLTAGE DROP LIMITED TO 2% FOR DC CIRCUITS AND 30i, FOR AC CIRCUITS 14. NEGATIVE GROUNDED SYSTEMS DC CONDUCTORS SHALL BE COLOR CODED AS FOLLOW& DC POSITIVE- RED (OR MARKED RED), DC NEGATIVE- GREY (OR MARKED GREY) 15. POSITIVE GROUNDED SYSTEMS DC CONDUCTORS COLOR CODED: DC POSITIVE- GREY (OR MARKED GREY), DC NEGATIVE- BLACK (OR MARKED BLAOg y 16. AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE A OR L1- BLACK, PHASE B OR L2- RED, PHASE C OR L3- BLUE. NEUTRAL- ; hepr Rid3e WHITE/GRAY USE -2 IS NOT INDOOR RATED BUT PV CABLE IS RATED THWN/THV"•IN-2 AND MAY BE USED INSIDE - USE -2 IS AVAILABLE AS UV WHITE 17. RIGID CONDUIT, IF INSTALLED, (AND/OR NIPPLES) MUST HAVE A PULL BUSHING PROTECT WIRES. 18. IF CONDUIT DETERMINED TO BE RAN THROUGH ATTIC IN FIELD THEN CONDUIT ILL BE EITHER EMT, FMC, OR MC CABLE IF DC CURRENT COMPLYING WITH NEC 690.31, NEC 250.118(10). DISCONNECTING MEANS SHALL COMPLY WITH 690.13 AND 690.15 19. CONDUIT RAN THROUGH ATTIC WILL BE AT LEAST 18" BELOW ROOF SURFACE COMPLYING WITH NEC 230.6(4) AND SECURED NO GREATER THAN 6' APART PER NEC 330.30(13). BLUE RAVEN 140314 RESEARCH WAY; BUILDING J OREM, UT 84097 800-377-4480 %fvW, d.BLUERAVENSOLAR.00M CONFIDENTIAL. -THE INFORMATION HEREIN CONTAINED SHALL NOT BE. USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOL.AR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION'V41TH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERIv11SSION OF BLUERAVENSOLAR LLC. ACED CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 A1'1fiT�•`�GIl7tIS] PRO JE T N::'.13ER 62537179 SHEET NA%IE ELEC. CALLS. PAGE NUMBER REVOON PVE3 0 f -a 000 -14 m O 00 Z > 0 0 ° L1i m N Q 0 2Ui p -- i LiJ z W (/} , >_ (D U) r ® U) 00 n DRAINING BY Kate Petersen A1'1fiT�•`�GIl7tIS] PRO JE T N::'.13ER 62537179 SHEET NA%IE ELEC. CALLS. PAGE NUMBER REVOON PVE3 0 E-11 Mw� ELECTRIC SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED — IN THE OPEN POSITION - DIRECT CURRENT MAXIMUM VOLTAGE VDC MAX CIRCUIT CURRENT AMPS RATED AC OUTPUT CURRENT A Op NOMINAL OPERATING AC VOLTAGE V 777,77777, 0 7A DUAL POWER SUPPLY j SOURCES: UTILITY GRID AND RV SOLAR ELECTRIC SYSTEM &WARNING..,", INVERTER OUTPUT CONNECTION] DO NOT RELOCATE THIS OVERCURRENT DEVICE THIS EQUIPIVIENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES. EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE SHALL NOT EXCEED AMPACITY OF BUSBAR. PHOTOVOLTAIC SYSTEM CONNECTED PV AC DISCONNECT LABEL 1 FOR PV DISCONNECTING MEANSA'HERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION. [NEC 690.13(6). NEC 705.22] LABEL 2 AT EACH DC DISCONNECTING MEANS, INCLUDING THE DC DISCONNECT AT THE INVERTER. [NEC 690.53. NEC 690.13(B)] LABEL AT POINT OF INTERCONNECTION, MARKED AT AC DISCONNECTING MEANS. [NEC 690.54, NEC 690,13 (B)] LABEL 4 AT POINT OF INTERCONNECTION FOR EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUTS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FORM MULTIPLE SOURCES, EACH SERVICE EQUIPMENT AND ALL ELECTRIC POWER PRODUCTION SOURCE LOCATIONS. [NEC 705,12(B)(3)1 LABEL PLACED ADJACENT TO THE BACK -FED BREAKER FROM THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE CONNECTION TO BUSBAR. [NEC 705.12(B)(2)(3)(b)j LABEL 6 (ONLY IF 3 OR MORE SUPPLY SOURCES TO A BUSBAR) SIGN LOCATED AT LOAD CENTER IF IT CONTAINS 3 OR MORE POWER SOURCES. [NEC 7D512(B)(2)(3)(C)] LABEL 10 SIGN LOCATED AT RAPID SHUT DOWN DISCONNECT SWITCH (NEC 690.56(C)(3)]. LABEL 12 PLACARD TO BE PLACED AT THE MAIN BILLING METER PER XCEL ENERGY, LABEL 13 PLACARD TO BE PLACED AT AC DISCONNECT PER XCEL ENERGY. SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAF913 SHUTDOWN SWITCH TOTHE 'OFr POSITION TO aNrrx SHUT DOWN PV SYSTEM eanas AND REDUCE SHOCK HAZARD IN THEARRAY LABELING NOTES: t LABELS CALLED OUT ACCORDING TO ,ALL L COMMON CONFIGURATIONS ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. 2. LABELING REQUIREMENTS BASED ON THE 2017 NATIONAL ELECTRIC CODE, OSHA STANDARD 19010.145, ANSI 2535. 3. MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 4. LABELS TO BE OF SUFFICIENT DURABILITY TO',,MTHSTAND THE ENVIRONMENT INVOLVED [NEC 110.211: 5. LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8". WHITE ON RED BACKGROUND: REFLECTIVE, AND PERMANENTLY AFFIXED [IFC 605.11.1.1] RAPID SHUTDOWN TEST NOT REQUIRED LABEL AT DIRECT-CURRENT EXPOSED RACEWAYS, CABLE TRAYS, COVERS AND ENCLOSURES OF JUNCTION BOXES. AND OTHER WIRING METHODS; SPACED AT MAXIMUM LOFT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS. [NEC 690.31(G)(334')] LABELS FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY SIGN TO BE LOCATED ON OR NO MORE THAN 3 FTAWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C}(1)(A)j LABEL 9 FOR PV SYSTEMS THAT ONLY SHUT DOWN CONDUCTORS LEAVING THE ARRAY SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AAIAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDO',j',N SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(B)] LABEL 11 SIGN LOCATED AT AC COMBINER BOX FOR ALL MICRO -INVERTER I AC MODULE INSTALLS (IF APPLICABLE). LABELING DIAGRAM FOR MICRO INV.: MAIN SERVICE PANEL LABEL 15 &W" PERMANENT DIRECTORY TO BE LOCATED AT MAIN SERVICE EQUIPMENT LOCATION IF ALL MAIN DISTRIBUTION UTILITY DISCONNECT(S) ELECTRICAL POWER SOURCE DISCONNECTING POWGRTOTHIS BUILDING IS ALSOSUPPUED FROM A ROOF MOUNTED SOLAR ARRAY WITH MEANS (SOLAR ARRAY RAPID SHUTDOWN A RAPID SHUTDOWN DISCONNECTING MEANS SWITCH) ARE GROUPED AND IN LINE OF SITE OF GROUPED AND LABELED WITHIN LINE OF SITE MAIN SERVICE DISCONNECTING MEANS. AND la Fr OF THIS LOCATION. [NEC 690.56(C) & NEC 705.10]. AWARMING i POWER TO THIS BUILDING IS ALSO SUPPLIED FROM MAIN DISTRIBUTION UTILITY DISCONNECT LOCATED &WARNING POWER TO THIS BUILDING IS ALSO SUPPLIED FROM ROOF MOUNTED SOLARARRAY. SOLAR ARRAY RAPID SHUTDOWN DISCONNECT IS LOCATED OUTSIDE NEXT TO UTILITY METER. LABEL 16 PERMANENT DIRECTORY TO BE LOCATED AT SOLAR ARRAY RAPID SHUTDOWN SWITCH DENOTING THE LOCATION OF THE SERVICE EQUIPMENT LOCATION IF SOLAR ARRAY RAPID SHUT DOWN DISCONNECT SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN DISCONNECTING MEANS, [NEC 705.10] LABEL 17 PERMANENT DIRECTORY TO BE LOCATED AT MAIN SERVICE EQUIPMENT DENOTING THE LOCATION OF THE PV RAPID SHUTDOWN SYSTEM DISCONNECTING MEANS IF SOLAR ARRAY RAPID SHUT DOWN DISCONNECT SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN SERVICE DISCONNECTING MEANS. [NEC 705.10, NEC 690.56(C)(1)] EXISTING SUB PANEL PV COMBINER (IF bNHERE POINT OF' SUBPANEL- NTERCONNECTION AC DISCONNECT IF: USED TO COMBINE AD JUNCTION BOX S MADE) (IF REQ. / INSTALLED) PV OUTPUT CIRCUITS OR AC COMBINER BOX @ IS U4 U3 & LJ 0 IF BREAKER USE LABELING DIAGRAM FOR STRING INV- / DO OPTIMIZER INV: MAIN SERVICE PANEL (D 13 12 13 INVERTER U3 IF BREAKER USED 'IF%NHERE POINT OF SUBPANEL - R15 0 Rn17 INTERCONNECTION OR PLA�_ARD IF USED TO COMBINE /7N (ONLY IF PV IS MADE) INTERCONNECTIOIN PV OUTPUT CIRCUITS CONSISTS OF LOA[ SIDE BREAKER) LABEL 15 &W" PERMANENT DIRECTORY TO BE LOCATED AT MAIN SERVICE EQUIPMENT LOCATION IF ALL MAIN DISTRIBUTION UTILITY DISCONNECT(S) ELECTRICAL POWER SOURCE DISCONNECTING POWGRTOTHIS BUILDING IS ALSOSUPPUED FROM A ROOF MOUNTED SOLAR ARRAY WITH MEANS (SOLAR ARRAY RAPID SHUTDOWN A RAPID SHUTDOWN DISCONNECTING MEANS SWITCH) ARE GROUPED AND IN LINE OF SITE OF GROUPED AND LABELED WITHIN LINE OF SITE MAIN SERVICE DISCONNECTING MEANS. AND la Fr OF THIS LOCATION. [NEC 690.56(C) & NEC 705.10]. AWARMING i POWER TO THIS BUILDING IS ALSO SUPPLIED FROM MAIN DISTRIBUTION UTILITY DISCONNECT LOCATED &WARNING POWER TO THIS BUILDING IS ALSO SUPPLIED FROM ROOF MOUNTED SOLARARRAY. SOLAR ARRAY RAPID SHUTDOWN DISCONNECT IS LOCATED OUTSIDE NEXT TO UTILITY METER. LABEL 16 PERMANENT DIRECTORY TO BE LOCATED AT SOLAR ARRAY RAPID SHUTDOWN SWITCH DENOTING THE LOCATION OF THE SERVICE EQUIPMENT LOCATION IF SOLAR ARRAY RAPID SHUT DOWN DISCONNECT SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN DISCONNECTING MEANS, [NEC 705.10] LABEL 17 PERMANENT DIRECTORY TO BE LOCATED AT MAIN SERVICE EQUIPMENT DENOTING THE LOCATION OF THE PV RAPID SHUTDOWN SYSTEM DISCONNECTING MEANS IF SOLAR ARRAY RAPID SHUT DOWN DISCONNECT SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN SERVICE DISCONNECTING MEANS. [NEC 705.10, NEC 690.56(C)(1)] EXISTING SUB PANEL PV COMBINER (IF bNHERE POINT OF' SUBPANEL- NTERCONNECTION AC DISCONNECT IF: USED TO COMBINE AD JUNCTION BOX S MADE) (IF REQ. / INSTALLED) PV OUTPUT CIRCUITS OR AC COMBINER BOX @ IS U4 U3 & LJ 0 IF BREAKER USE LABELING DIAGRAM FOR STRING INV- / DO OPTIMIZER INV: MAIN SERVICE PANEL EXISTING SUB PANEL (D 13 a INVERTER U3 'IF%NHERE POINT OF SUBPANEL - IF BREAKER USED INTERCONNECTION 0 R 90 IF USED TO COMBINE 15 OR 17 OR P ARD 5 IS MADE) (ONLY IF PV PV OUTPUT CIRCUITS INTERCONNECTIOP CONSISTS OF LOA[ m SIDE BREAKER) EXISTING SUB PANEL PV COMBINER INVERTER (S) 'IF%NHERE POINT OF SUBPANEL - 0 INTERCONNECTION AC DISCONNECT IF USED TO COMBINE CV0 IS MADE) (IF REQ. I INSTALLED) PV OUTPUT CIRCUITS _Y m (D O 0 > IF BREAKER USE[ (D n16 E9 0 -5 (ONLY IF PV INTERCONNECTION CONSISTS OF: LOAD 0 CO 0 SIDE BREAKER) 0 DC DISCONNECT INTEGRATED Citi OI Vjt,00j iWidgG di . ision JUNCI ION BOX QR CO€v1BiNEP. BOX *ELECTRICAL DIAGRAMS SHO'AN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD, AND LOCATION PRESENTED ON PV5 OF 3 LINE DIAGRAM. PV5 LINE DIAGRAM TO REFLECT ACTUAL REPRESENTATION OF PROPOSED SCOPE OF WORK. Nom. BLUE RAVEN 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 %AAA,lAl. BLUE RAVE NSOLAR, C OM CONFIDENTIAL. -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUERAVENSOLAR NOR SHALL IT BE DISCLOSED IN'AfHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNEC TION',,,'ITH THE SALE AND USE OF THE RESPECTIVE EQUIPI'v1ENTIA11THOUT THE WRITTEN PERMISSION OF BLUERAVENSOLAR LLC. NASCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: EIRS FIELD OPS 385.498.6700 DATE Line 5, 2019 PROJECT NUN'16FR 62537179 SHEET NAME LABELS PAGE NUMBER, REVISION PV8 0 0 CV0 -0 CC) _Y m 0 00 > 0 -5 0 CO 0 N 0 U) Cr CD 0 Lli U_ < LU IT— U) F_ .0 0 0 0 U) C0 m ❑ DRAWING BY Kate Petersen DATE Line 5, 2019 PROJECT NUN'16FR 62537179 SHEET NAME LABELS PAGE NUMBER, REVISION PV8 0 r ZaTa S r , � -' Enphase .Microzinve rters Per4`on AIVERCAS Enphase IQ 7 and IQ 7+ W L To team rr, ore about Enphase ofrerings, visit entphasexomi Tice high-powered smart grid-feady Enphase IQ 7 Micro— and Enphase IQ 7+ Nlici-c- dram.atica 114y simpl ify tne in sta I lefio In process while achieving the highest system efficiency - Part of the Enphase IQ, System, the 10 7 and IQ 7+ Microinverters integrate with the Enpt?ase IQ Envoy—., Enphase IQ Battery-, and the Enphase Enl'ghter.- monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and Undergo over a million hours of power -on testing, enabling Enphase to provide an inclustry-leading warranty of up to 25 years. Easy to Install Llghtw*ight and simple Faster instalation cabling Duitlirralpidl shutdown cr--.-np liart- (NEC 201A & 2017) FEM119RIMMITIARMITF MMI Optimized for high powered 60-celil and 742-cell"rrfodules More than a rrillion hours of testim • Class N UL listed • Cornp[ieswith advanced grid support voltage and fteqjen--y ride-thrOUgh re1:?UjFerr0eits • Pernotely updates to respond tochansir g grid requirenwnts • Configurable for Varying grid profiles MieetsCAFule2l (UL1741-SA) 'ThalQ 7- Mlceonreujuvdio supper, 72 -veli rnordulev. ENPHASE. Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA (DC) IQ7-60-2-US I IQ7-60-B-I.JS IQ7PLUS-72-2-US I IQ7PLUS-72-B-US Commonlyn_aed module pairings' 235W-350 %+ 235tH -444W+ Module compatibility 60 -cell PV modules only 60 -cell and 72 -cell PV modules Maximurn input DC voltage 48 v 60V Peak power tracking voltage 27 V - 37 V 27V -45V Operating ra nge 16 V- 4.8 V 16V -60V Min/Max start voltage 22V/48V 22 V/ 60 V Max DC short circuit current module Ise) 15A 15A Overvoltage class DC port 11 11 DC port backfeed current 0 A 0 A PV array configuration 1 x 1 ungrounded array; No additional DC side, protection required, ,AC side protection requires max 20A per branch circuit i2LUE RAVEN 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 VVk1'AAf.BLUERAVENSOLAR.COM CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. —- — - — --------------- -- -- — Peak output Power ---- — - 250 VA 295 VA Maximum continuous output power 240 VA 290 VA NABCEP Nominal (L -L) voltage/range2 240 V / 208v/ 240 V / 208 V! 211-264V 183-229V 211,264V 183-2-19 V CERTIFIED Maximum continuous output current 1.0 A (240 V) 115 A (208 V) 1.21 A (240 V) 139 A (208 V) Nominal frequency 60 Hz 66 Hz PV INSTALLATION Extended frequency range 47 -68 Hz 47-68 Hz PROFESSIONAL AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Scott Gurney Maximum units per 20 A (L -L) branch circuit; 16 (240 VAC) 13 (208 VAC) 13 (240 VAC) 11 (208 VAC) # PV -011719-015866 Overvoltage class AC port III III CONTRACTOR: AC port backfeed current 0 A 0 A BRS FIELD OPS Power factor setting 1.0 1.0 Power factor Odjustable) 0,7 leading 0.7 lagging 0.7 leading 0.7 lagging 385.498.6700 EFFICIENCY @240 V @208 V @240 V @208 V Pea k C k. `effi_ctency­ 97.6 IX 97,6 975'," _973"% CEC weighted efficiency 97.0 % 97.0 is 97.0% 970 MECHANICAL DATA Ambient temperature range .. .. . ....... -40'C to +65°C Relative humidity range 4% to 100%. (condensing) Connectortype (IQ7-60-2-US & fQ77PLUS-72-2-US) MC4 kor Amphenol H4 UTX with additional Q -DCC -5 adapter) Connector type (IQ7-60-8-US & 107PLUS-:72-B-US) Friends PV2 (MC4 intermateable). Adaptors for modules with MC4 or UTX connectors: PV2 to MC4: order ECA -S20 -S22 PV2 to UTX: order ECA -S20 -S25 Dimensions (WxHxD) 212 mm x M mm x 30.2 mm (without bracket) Weight 1.08 kg (2.38 lbs) Cooling Natural convection - No fans Approved for wet locations Yes Pollution degree PD8 city of Enclosure Class 11 double -insulated, corrosion resistant polymeric enclosure Environmental category UV exposur,- rating NEMA Type 6 y�,Jdoor RidgeFEATURES wheat LineCommunication(PLC) Monitoring- Enlighten Manager and MyEnlighten monitoring options. ing Division Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connecters have been evaluated and approved by UL for use as the Icad-brew k. disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741 -SA) UL 62109-1, UL1741,'IEEE1547, FCC Part 15 Class B, ICES -0003 Class 8, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC -2014 and NEC -2017 section 690.12 and 022.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer's instructions. - ----- ---- -------- 1. Noenforced DC=ratio. See the cornpalb:11ty calculator at htip.,$,:Ilgnphase.c,.on/en-,uslsuppQrlI odle- M mpaji I Z Nominal vona ge range fan be exte nd e d bond no rn:nal if i e qu "red by the [1111 3. Jrnfls nay vary, Refer I o loc al requirements to de 1`1 ne the nurmer of mic.rorriverlers p_r branch in VoLl, area, SHEET NAME To learn more about Enphase offerings, visit enphase,com t:!k ENPHASE. SPEC SHEET 115 E.praseE cr-gi, I,- :,_-:r)ds ,,e:d arc tl,,e prox�rty of we pl-, 201 &!"is 24 PAGE NUMBER REVISION �M$ sl.phase Networking Enphase IQ Combiner The Enphase ltd Combiner 3" w th Enphase IQ Envoy' consolidates interconnection equipment into a single enclosure and streamlines PV and storage 'nsta at ons by provid'ng a consistent, pre -wired so ut'on for resident'aapplications. It o'fers up to four 2-po e input circuits and Eaton BR series busbar assembly. Smart Includes IQ Envoy for communication and control Flexible networking supportswi-Fi, 1 Ethernet, or cellular Optional AC receptacle available for PLC bridge Provides production metering and optional consumption monitoring V` LISTED To learn more about Enphase offerings, visit enphase.crrn Simple Reduced size from previous combiner Centered mounting brackets support single stud mounting Supports back and side conduit entry Up to four 2 -pole branch circuits for 240 VAC plug-in breakers (not included) 80 A total PV or storage branch circuits Reliable Durable NRTL-certified NEi••11A type 3R enclosure Five-year warranty UL listed AGE NUMBERI REVISION SS 0 BLUE RAVEN Enphase IQ Combiner 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 MODEL NUMBER _iQ IQ Cornbiner3 X -IQ -AMI -240-3 C mb'ner 3 with Enphase IQ Envoy 'printed circuit board for integrated revenue grade PV 800-37711480 production metering (ANSI 012.20 +1- 0.5'!x) and optional* consumption monitoring (+f- 2.51k). t,W W.BLUERAVENSOLAR.COM ACCESSORIES and REPLACEMENT PARTS (not included, order separately) CONFIDENTIAL -THE INFORMATION Enphase Mobile Connect" CELLMODEM-03 4G i 12 -year data San � y R ) Plug and la Industrial rade cellular modem with data tan for stems a to 60 9 play g p y p HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF CELLMODEM-01 (3G f 5 -year data plan) microinverters. (Availablein the US, Canada, Mexico. Puerto Pico, and the US Virgin islands, ANYONE EXCEPT BLUE RAVEN CELLMODEM-M1 (4G based LTE -M f 5 -year data plan) where there is adequate cellular service in the installation area.) SOLAR NOR SHALL IT BE Consumption Monitoring" GT DISCLOSED IN WHOLE OR IN PART CT--200-SPLIT Split core current transformers enable whole home consumption metering (+1- 2.5%). TO OTHERS OUTSIDE RECIPIENTS Circuit Breakers Supports Eaton BR210, gR215, 88220, BR230, BR240, BR250, and BR260 circuit breakers. ORGFlNIZAEXCEPT IN ITH CONNECTION WWITH THE SALE AND 6RK: 10A-2-240 Circuit breaker, 2pole, 10A, Eaton BR210 USE THE RESPECTIVE BRK-15.4-2-240 Circuit breaker, 2 pole, 15A, Eaton BR215 EQUIPMENT, WITHOUT THE BRK 20A -2P-240 Circuit breaker, 2pole, 20A, Eaton BR220 ITTE WRITTEN PERMISSION OF BLUE EPLC-01 Power line carrier (communication bridge pair), quantity 2 RAVEN SOLAR LLC. XA-PLUG-120-3 Accessary receptacle for Power Line Carrier in IQ Combiner 3 (required for €PLC -01) XA-ENV-PCBA-3 Replacement IQ Envoy printed circuit board (PCB) for Combiner 3 ELECTRICAL SPECIFICATIONS CERTIFIED Rating Continuous duty System voltage 1201240 VAC, 69 Hz PV INSTALLATION Eaton BR series busbar rating 125 A PROFESSIONAL Max. continuous current rating(output rid) C P g 65 A Scott Gurney # PV -011 71 9-01 5866 Max, fusedcircult rating (output) 90A CONTRACTOR: Branch circuits (solar and/or storage) Up to four 2 -pole Eaton B R series Distributed Generation (DG) breakers only (not included) BRS FIELD OPS Max. continuous current rating (input from PV) 64A 38 385.498.67Q0 Max total branch circuit breaker rating (input') 80A of distributed generation t 90A with IQ Envoy breaker included Production Metering CT 20C A solid core pre-installed and wired to IQ Envoy MECHANICAL DATA Dimensions (WxHxD) 49 5x 375 16.8 cm (19.5" x 14.75"x 6 63") Height is 21 06(1_3 5 cin w I;h mounting b ackets) Weight 7.5 kg (16.5 lbs.) Ambient temperature range -40° C to +46° C (-400 to 115° F) Cooling Natural convection, plus heal shield Enclosure environmental rating Outdoor, NRTL-certified, NEMA type 3R, polycarbonate construction Wire sizes 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors 60 A breaker branch input: 4 to 110 AWG copper conductors Main lug combined output: 10 to 210 AING copper conductors Neutral and ground: 14 to 110 copper conductors Always follow local cede requirements for conductor sizing. Alt, adv To 2000 meters (6,560 feet) INTERNET CONNECTION OPTIONS Integrated Vvi-Fi SG2IIbr'g,n H G;ty of Ethernet Optional, 802.3, Cat5E (or Cat b) UTP Ethernet cable (not included) Cellular Optional, CELLMODEM-01 (3G} or CELLMCDEM-03 (4G) or CELLMODEM-M1 (4G based LTE -M) yidge ,,not included) 1[SM� ,at Division COMPLIANCE Compliance, Combiner UL 1741 gull in9 CANICSA 022.2 No. 107.1 47 CFR, Part 15, Class B, ICES 003 Production metering. ANSI 012.20 accuracy class 0.5 (PV production) Compliance, iQ Envoy JUL 60601-1ICANCSA 22.2 No. 61010-1 * Consumption monitoring is required for Enphase Storage Syster ns. To learn more about Enphase offerings, visit-enphase;cwn Q 20 I - Mira ..El-'e-ar.Alnn t.>.cscn.ed.; i trad..m.,rlaerbrans-In this dcrarn..:are r.gi_•tcrc. ty taciir r-....r..-.p.aLar. � ?C f J -I,'; - SHEET NAME SPEC SHEET AGE NUMBERI REVISION SS 0 60 CELL MONOCRYSTALLINE MODULE 275 -315W -- POWER OUTPUT RANGE 19.2% MAXIMUM EFFICIENCY Maximize limited space with top -end efficiency -Up to 1CZlV,m,' riowerdensity _._�. • Low thel"ini'1 coefficients for ig.reat.i r ene €gy prcid ctiitol'1 at }'.Isgh CtpP,. .inq "zemperat'. rPc POSITIVE POWER TOLERANCE Highly reliable due to stringent quality control "O'r�r30in- ousott_-s .IV,Tt ICanGt1 'tymnre) Fca6eEIn1957,T naStari5thewasicYS;flatGny comp-ahenswe5olutionsprovider for solarener-4y_ • Inhouse testing goes I.0beyond Certif cxi.. i regUireennei tS wa ilelE?„Wv' f<ti:iE. cSH7}}'.9ati{:?'i :Ni132 aUf part."1er515 • � {,:-Sistant critical to success. Trina Sour now distributes ;t5 1001;,b ftdouble lns,pel-tki3F` Pti product, to ovaM 60 countries al over the world,-dria'sabl inprovideexcepbonaisei,dre Selective emitter, adVanced5urface-texturing toeach a tanner in each markaixidsupplerrent our4111mauwe ra &.e orcidiuciswiththetacking of Tnna is a5 iri g t+in4able "),uti7f r We are committedtobftdi-Nstra`eo rout 3r Certified to withstand. the most challenging berwr6cilC Ilaboraticr, with irrtalfers Ircll ntai conditions d•stri .tcr>andLiheit..iftrK.S. - • 24(10 Pa wind load _._... .-_.� • S7C O I'a �riuwload Comprebenst e Products • 731 mm hall !:,!.ones at 97 klri/h And S °st rn Certificates iEC6121:r/iE?;fi17 P.it..17t13fiEC6I75,01 tELI,271n rr1J9)01: Q'J' ty r4ai,a empm System - 60 VZO(M EnvironmentalmaagerrenS-yste,, n n1aC•FA GrEa d-iCV5EQ3".+r'4F?fiSrX1S sYtiE3irN? fi3i,4<, 1�T00 r {.;k, , u atttf arylSr':*t LINEAR PERFORMANCE ARRANTY 10yetirpraductwarrante' 25 Year Linear Power Wanare y --;: War ;.�. worn �mw' t ux, „ - �_.µ. ......... ,[ ............. .. .. ........._.. .................... .. Trmasue-,Iar _. ._-...... _._._______........... , L 4, iYdtt•ti:'ti f r.d .v's¢ ,1 ��: iv^ >t1ar)e(::. Y,. ' ) PLUS" FRAMED 60 -CELL MODULE ULE :I RAVEN i ipl ­ - POINER RANGE ELECTRICAL, DATA (STC) T5M DDQ5A QB(It) 2fl0 315-} 1403 N RESEARCH WAY, BUILDING J TsM DDQ5R.Q5(Il) I 275 315 PeakPOWC1Watt, P»,y(W'pt* 275 280 295 29'0 295 30� 305 310 315 OREM UT 84097 PmwerGvtper;7n6eranrt�t'Y+x(4¢ Q" is 800-377-4420 V'W'AV.BLUERAVENSOLAR.COM Maximum PoerVaiiage V lV) 31 4 317 31,d 32.2 32.5 32.6 32.9 33.1 ?3.3 MaximumPDlirmCurrc+nt-Iw (A) 875 FJ34 8,97 9.01 ' 9118 9.3(3 9.?8 937 9.46 CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED S€ -TALL NOT BE Open Cirruit voitage•Vr" (v) BA _ €9,4 185 :I8.9 39.5 39.8 40..0 402 40.5 USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN Short circuit Current dsr(A) 9..24 9.42 9SI 9.66 6:68 9.77 9.45 9.94 10,0 SOLAR NOR SHALL IT BE - MnrbriaFtfiri.?gryrp,(%) 16,3 771 17.4 17.7 URO 1611 186 18.9 1912 DISCLOSED IN V,tHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS tcanaaeeaacv��r-�.GTe'rttr�:ue1=�.=r rtsFttts, ORGANIZATION, EXCEPT IN kir*„• Tnie;rarluaera;sce:, a CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE ELECTRICAL DATA (NOCT) EOUIPMEN 1' VaITHOU TITHE s "RIITEN PERMISSION OF BLUE a NaxrmumPawer•Pw(wp) 205 209 212 216 220 273 227 231 235 RAVEN SOLAR LLC. R � t MaximumPiwaerYratage•VwT(t) 291 29.4 29.5 29.9 301 302 3(15 30.7 30.9 Maximum Power Current -I- (A) 7,04 7.14 7,21 7.24 7,30 7.3£3 7.46 753 7.b0 N9 E 3 Open Circuit VCha.3e-Vrx (4) 35.7 35.7 35.3 36.2 353 37.0 37.2 967.4 37 6 <, Short ClreuiiCurrrsnt h: (A) 7.46 761 7�>3 �.�J 7.82 :7.89 7.c71956.03 8110CERTIFIED PV INSTALLATION c+x<ur _ N'rxF;lrc32nFlAti,.fW3n`,RYe,'.iPnCTPmjlf'2tlitP.("s'E. T7:n15M.E'b'^� PROFESSIONAL -'' Scott Gurney ISE CH.ANIC,AI_ D ITA # PV -01 1719-015566 15ft i8 R93�i:1 Solarcells Monocry5tarrne156.75a156.15mrn(6tache5) CONTRACTOR: Cell Orkontatan 60 celis(6 x10} BRS FIELD OPS Module Dimensions Ib5D * 99Z .,,1Smm (65.0 x 391 * 1.38 mches} 385.49$.6700 Weight 19.6 kg (41 C Ib 1 Glass 3.2 min (0.13 inches), High Transmission, AR Coated Tempered Glass Hacks#eet W'Itte €)D05A 08(li)It Black l 5A,05(141 3s,•r_as. Frame Black Anodized AlucTi)niurn Aticy(D-IOSA.08(11),DC05R,05(1I)# (A -A) I -Box 9P 67 or IP68:rated Cables Phatovottai c Techr2o€ogy Cable 4,0 min' (0.006 inme5z), I-vC1'"Rfs')F a r I1000mm(39Ainches) Connector TrinaiS4 'O Eire Type Type 1 orlrype 2 5 u H a r' TEMPERATURE, RATINGS MAKWUM RATINGS riCx"1`A ��� s ratamiz..,wa3 44�C(*2°C) 4peratlmalTemperatt¢rs 40° -*85°C Tpaipr_rattreCoeiBderrtofP")=n --:39461°C MaAmur, S"mttrin:Voltage I(COVDc13PC) •� vciu�ew TemperatureCneflidrntofV C.-'lgid°C_ I=D00YDc(t'L) City of _ �+o fe[nper;7turtaCoeR?denta€:>�, O.tJSecn'C. �tax5ecl�FusaRating 3 15A(Power t7.k35x6) \\ 20A(Power _>?93Y7) Whecd Ridge % ��^''••^��� 'rmewa'�tyse n.tsmtv+urHvxw�fnrm rs mccest>��it ing Division i WARRANTY PACKAGING CONFIGURATION Fl 1 10 year Product WOrlimanshipWarranty Modules per bm30pieces 25 year Unear Poweq Wa -army Modules per 4fs' container:840 pfeee, 'Reasre#ea U'i Wadtctr�arcdnty for __C.,'r CITICIIII 5AfETIANIIN TALLk.T1CN INSTRUCTJONS BEFOQEUSINC,TH FRODUCT. linasolar 02D17rr?•aSnlarLrr d.At;nghtsieservecSpeofca,"orv,;inducedi,_dataslhahtaresubieCTt0fhangewithout notice, SHEET NAME �+g,,,I � Iter sn r iuc moer; TSM_EN. 2016_A wWr ,:. r asotar com SPEC S }i E E T PAGE NUMBER( REVISION SS jj( II o' Basic Features • Stamped Seamless Construction • 18 Gauge Galvanized Steel • Powder Coated Surfaces • Flashes into the roof deck • 3 Roof deck knockouts .5", .75" V • 5 Centering dimples for entry/exit fittings or conduit • 2 Position Ground lug installed • Mounting Hardware Included —Fuse holders and terminal blocks added in the field must be UL listed or recognized and meet 600 VDC 30 AMP 114C for fuse holders, 600V 50 AMP 90C for rail mounted terminal blocks and 600 V 175 AMP 90C for Power Distribution Blocks, Use Copper Wire Conductors. SolaDeck Model SD 0783 SolaDeck UL50 Type 311 Enclosures Available Models? Model SD 0783 - (3" fixed Din Rail) Model SD 0786 - (6" slotted Din Rail) SolaDeck UL 1741 Combiner/Enclosures Models SD 0783-41 and SD 01786-41 are labeled and ETL listed UL STD 1741 according to the UL STD 1741 for photovoltaic combiner enclosures. Max Rated - 60OVDC, 120AMPS Model SD 0783-41 3" Fixed Din Rail fastened using Norlock System **"typical System Configuration 4- Din Rail Mounted Fuse Holders 60OVDC 30 AMP 1- Power Distribution Block 60OVDC 175AMP 1- Bus Bar with UL lug Model SD 0786-41 6" Slatted Din Rail fastened using steel studs **Typical System Configuration 4- Din Rail Mounted Fuse Holders 60OVDC 30 AMP 4- Din Rail Mounted Terminal Blocks Bus Bars with UL lug conduit or fittings, base is center dimpled for fitting locations. Model SD 0783-41, wired with Model SD 0786-41, wired with Din Rail mounted fuse holders, Din Rail mounted fuse holders, bus bar and power distribution terminal blocks and bus bars. block. RSTC Enterprises, Inc . 2299 Heimstead Road . Eau Cliare, Wt 54703 For product information call 1(866)367-7782 BLUE RAVEN 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 i1i/•,1IV.BLUE RAVENS OLAR.COM CONFIDENTIAL -THE INFORM=ATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN'V•1HOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EUUIPNlEN1. Wit HOUT THE VdRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. ABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 city of Wheat Ridge Built ng Division SHEETNAME SPEC SHEET _ AG NUMBER REVISION SS 1 0 S F M Star Washer is Single Use Only TERMINAI-11`)RQUE, install Coir' . actor and torque to the followir 4-6 AWG, 35in-lbs 8 AWG: 25 in -lbs 10-14 AWC--. 20 in -lbs TERMINAL TORQU51' Install. Conductor and torque to the following. 4-14 AWG: 35in-lbs WEEBLUG Single Use Only 46 TERMINALTORQUEi.�, Install Conductor and torque to the following: 6 -14 -AWG- 7ft-lbs LUG DET IL & TORQUE INFO LUG DETAIL Rx TORQUE k'1170 LUG DETAIL & TORQUE If-IF0 11sco Lay -In Lug (GBL-4DBT) 11sco Flange Lug(S66-4) WiLeyWEEBLug (6.7) 0 10-32 mounting hardware a 1/4" mounting hardware 0 1/4" mounting hardware & Torque = 5 ft -Lb 0 Torque = 75 in -Lb 0 Torque = 10 ft -Lb 0 AWG 4-14- Solid or Stranded 4 AWG 4-14- Solid or Stranded 0 AWG 6-14 -Solid or Stranded NOTE: ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION E -W BONDING PATH: E -W module to module bonding is accomplished with 2 pre-installed bonding clips which engage on the secure side of the MicroraiLTm and splice. N -S BONDING PATH: N -S system bonding is accomplished through a N -S bonding clip. Insert each end of the N -S bonding clip onto a module frame flange. C i; X2,6 ,,, i i;.J""' �' Er it is i-�,commended that N--,- !',,,;ndinQ ctips be installed on both edges for ease of rn�,0ntenance also: maintenance Pane, S! System bonding is accomplished through modules. System grounding accomplished by attaching a ground Lug to any module at a Location on the module specified by the module manufacturer. lk Net.- BLUE RAVEN 1403 N RESEARCH WAY. BUILDING J ORENI, UT 84097 800-377-4480 '0AAJ'Al. B LU E RAVENS OLAR.0 OM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT qT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN'I,,HOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT.V',IIIHOUT THE VVRI'TTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP �CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney PV -011719-015666 CONTRACTOR: SRS FIELD OPS 385.498.6700 SHEET NAME SPEC SHEET PAGE NUMBER R EVI SiON SS 1 0 AUTHORIZATION TO MARK This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance vvith the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification marks) may be applied only at the location of the Party Authorized To Apply Mark. Applicant: Unirac, Inc Manufacturer: Jiaxing Pacific Energy Equipment Corp. No. 8 Haiwan Ave 1411 Broadway Blvd NE Hangzhou Bay Bdao New Area Address: Albuquerque, NM 87102 Address: Haiyan Economic Development Area Jiaxing City, Zhejiang Province Country: USA Country: China Klaus Nicolaedis Lili Zeng Contact: Jason Mayfield Contact: George Huang Phone: 505-462-2190 Phone: 510-979-1920 505-400-2949 650-799-7627 FAX: NA FAX: NA klaus.nicolaedis@unirac.com Email: lzeng@ccmfg.com Email: jasonm@unirac.com george@ccmfg.com Party Authorized To Apply Mark: Same as Manufacturer Report Issuing Officer Lake Forest, CA Control Number: 5003278 Authorized by: � for Dean Davidson, Certification Manager US OTT Intertek _ This document supersedes all previous Authorizations to Mark far the noted Report Number. This Authorization to Mark isfor the exclusive use of Intertek's Client and is provided pursuant to'the Certification agreement between Interok and its Client. Intertek'sresponsibihty and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage. occasioned by the use of'this Authorization to Mark Only the Client i5 authorized to permit copying o,r.distnbutionofthis Authorization to Mark andthen only in its entirely Use of Intenek's Certification mark is restricted to the conditions laid out in the agreement and in this Authorization to Matk Any further useofthe Intertek name for the sale or ad,ertisement of the tested material, product or senri':e must first be approved in writing by Intertek Initial Factory-Assassments and Followup Services are for the purpose of assuring appropriate usage of the Certification mark in accordance wath the agreement, they are not for the purposes of production quality control and do not relieve the Client of the,r obligations in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, ArlingtonHeights; IL 60006 Telephone 800-345-3851 or 647-439-5667 Fax 312-283-1672 ATM for Report 102393982LAX-002 Page 1 of 2 ATM Issued: 2 -Mar -2017 ED 16.3.15 (1 -Jul -1, 6) Mandatory BLUE RAVEN 1403 N RESEARCH WAY, BUILDING J OREtvi, UT 84097 800-377-4480 vVIA W.BLUERAVENSOLAP,.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE EENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED W WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, V411 HOUT TI iE V.'RIT TEN PERMISSION OF BLUE RAVEN SOLAR LLC. EP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 OS Wh6a� V%d9e Brill �r9 O' iixo� HEFT NAIME SPEC SHEET GE NUMSE? ��E'v€S€ON ss 0 UL 2703 Issued: 2015101/28 Ed: 1 Mounting Systems, Mounting Devices, Clamping/Retention Devices, Standard(s): and Ground Lugs for Use with Flat -Plate Photovoltaic Modules and Panels Photovoltaic Mounting System, Sun Frame Micro Rail- Installed Using Unirac Installation Manual, Rev Product: PUB2017FEB16 Brand Name: Unirac Models: Unirac SFM ATM for Report 102393982LAX-002 Page 1 of 2 ATM Issued: 2 -Mar -2017 ED 16.3.15 (1 -Jul -1, 6) Mandatory BLUE RAVEN 1403 N RESEARCH WAY, BUILDING J OREtvi, UT 84097 800-377-4480 vVIA W.BLUERAVENSOLAP,.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE EENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED W WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, V411 HOUT TI iE V.'RIT TEN PERMISSION OF BLUE RAVEN SOLAR LLC. EP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 OS Wh6a� V%d9e Brill �r9 O' iixo� HEFT NAIME SPEC SHEET GE NUMSE? ��E'v€S€ON ss 0 ERIC : a U N F R A 1`4 E 144 11'C" R 0 R A I Man. G RA I S F. D_ S E A I. TL A S-11. 111 ow TABLE OF CONTENTS: Tools & Assembly Details Quick Steps for installation PG I I JIMM211[113H111111 PUB2017JAN11 one SUNFRAME MICRORAIL In : RAISED SEAL FLASHPIG, TOOLS REQUIRED OR RECOMMENDED FOR LAYOUT & INSTALLATION: • TAPE MEASURE • CHALK LINE • ROOFING CRAYON • HAMMER • COMPATIBLE SEALANTAND DISPENSER • DRILL WITH EITHER 1/8" BIT FOR GRK AND • UNIRAC CUSTOM STRUCTURAL 5CREWOR 7/37' SIT FOR LAG BOLT - IMPACT DRIVER WITH W SOCKET (OPTIONAL W HEX DRIVER FOR UNIRAC CUSTOM STRUCTURAL SCREW) SFM RAISED SEAL FLASHING COMPONENTS: 1. FASTENER, LAG BOLT, 5/16* • UNIRAC CUSTOM STRUCTURAL SCREW. S/167 - GRK STRUCTURAL SCREW. S/16' INSTALLATION NOTES: 2.5/16- ID EDPM SEALING WASHER A. It is not necessary or advisable to use nails or other fasteners to secure the perimeter of the flashing. 3. SFM MOUNTASSEMBLY (VARIOUS) WITH SLIDER B, The SFM Raised Seat Flashing is made to work with standard and high-definition composition/asphalt and 4, SPM RAISED SEAL FLASHING wood shingle roofswith S* to S-SA'course� S. COMP SHINGLE ROOF C Mounts shoutd not be instated in areas of the roof susceptible to ice damming. Ponding water can travel upward under shingles and reach the belt penetration. D.Fastener length specification and capacity verification are the responsibility of the installer, TOOLS & ASSEMBLY DETAILS 1 N TECHNICAL DATA SHEET: PAGE QUICK INSTALLATION STEPS INSTALLATION ORE PAGE --------------------------------------------------------------------------------------------------------------------------------------------- 4 PREPARING SHINGLES: Use roofing DRILL PILOT HOLES: Holding the drill ROOF SEALANT: Fitt pilot hole with OPTIONAL SEALANT ON FLASHING: bar to break seats between Ist and square to the rafter, drill 3"deep pilot appropriate sealant. Apply a circle shaped bead of sealant 2nd, and 2nd and 3rd shingle courses. hole into center of rafter using IA' around the attachment hardware hole Be 5 ule to remove a LI nails to allow aircraft extension bit for 5/16' GRK of the flashing before insertion. Do correct placement offLashin(j. See SFM or Unirac Custom Structural Screw or hot use mess ive "a [a m_ installation guide for proper flashing 7/32" aircraft extension bit for 5/16' placement.---- fag. 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 VffAV.BLUERAVENSOLAR.COM CONFIDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. ABCEP CERTIFIED I PV INSTALLATION PROFESSIONAL Scott Gurney # PV -011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 PAGE NUMBER REVISION Ss 1 0 0% 4L11. .1k r POSITION FLASHING: Slide the PLACE SLIDER: Place slider with INSTALL FASTENER & TIGHTEN: COMPLETE FLASHING INSTALLATION: flashi rig up underneath the 2nd course dSSERIbly over the flashing flute, Install fastener with seating washer. Repeat previous steps to install all of shingles, so that the bottom edge ensuringthat the slider snsilat on the Swivel the slider to gauge proper mounts. of the flashing does not overhang the flashing surface. torque when driving the fastener. SHEET NYE downslope edge of the 1st course of Tighten until slider stops swiveling shingles. easily. SPEC EC SHEET PAGE NUMBER REVISION Ss 1 0 i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 1� FT Job Address: 3001 5 hen'd-g/7 44 Permit Number: 201704119-t-1 ❑ No one available for inspectio Time i� AM/PM Re -inspection required: Yes No When corrections have been made, call for re -inspection at 303-234-5933 Date: Inspector: M r# DO NOT REMOVE THIS NOTICE INSPECTION RECORD Inspection online form: http://www.ci.wheatridge.co.us/inspection Cancellations must be submitted via the online form before 8 a.m. the day of the inspection Inspections will not be performed unless this card is posted on the project site F Request an inspection before MIDNIGHT (11:59 PM) to receive an inspection the following business day PERMIT: ADDRESS: Y01SR1a&?26WJ03 QODE( OP Foundation Inspections Date Inspector Initials 102 Caissons / Piers 103 Footing / P.E. Letter 104 Foundation Setback Cert. 106 Foundation wall Insulation Do Not Pour Concrete Prior To Approval Of The Above Inspections Underground / Slab InspectionsI Date I Inspector Initials Com Comments 201 Electrical / Cable/ Conduit 202 Sewer Underground Int. 203 Sewer Underground Ext. 204 Plumbing Underground Int. 205 Plumbing Underground Ext. 206 Water Underground Do Not Cover Underground or Below / In -Slab Work Prior To Approval Of The Above Inspections Rough Inspection Date Inspector Initials Comments 301 Rough Framing 302 Wall Sheathing '.iv.7 rwz:.oilcla i i 304 Sheer Inspection 305 Insulation 306 Mid -Roof 307 Metal / Lath / Stucco 308 Rough Electrical Residential 309 Rough Electrical Commercial 310 Electrical Meter Residential 311 Electrical Meter Commercial 312 Temp. Const. Meter 313 Rough Plumbing Residential 314 Rough Plumbing Commercial 315 Shower Pan SEE OVER FOR ADDITIONAL INSPECTIONS Rough Inspection (continued) Date Inspector Initials Comments 316 Rough Mechanical Residential ! , 317 Rough Mechanical Commercial 318 Boiler / Furnace 319 Hot water tank 320 Drywall screw and Nail 321 Moisture board / shower walls 1)�71 % 322 Rough Grading Mai 323 Miscellaneous Final Inspections Date Inspector Initials Comments _ 4n2 Gas Kilater Release ! , 403 Final Electrical Residential 404 Final Electrical Commercial 405 Final Mechanical Residential 406 Final Mechanical Commercial 407 Final Plumbing Residential 1)�71 % 408 Final Plumbing Commercial 409 Final Roof 410 Final Window/Door 411 Landscape/Park/Planning Inspections from these entities shall be requested one week in advance. For landscaping and parking inspections please call 303-235-2846 For ROW and drainage inspections please call 303-235-2861 For fire inspections please contact the Fire Protection District for your project. 412 Row/Drainage/Public Works 413 Flood plain Inspection 414 Fire Insp. / Fire Protection 415 Public Works Final 416 Storm Water Mgmt. 417 Zoning Final Inspection 418 Building Final Inspection Note: All items must be completed and approved by Planning, Public Works, Fire and Building before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not constitute authorization of occupancy. For Low Voltage permits please be sure that rough inspections are completed by the Fire District and Electrical low voltage by the Building Division. Zo�7t�'s3Y i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type:16 ?1, 6k),40 - Job Address: Permit Number:70E-3- ❑ No one available for inspection: -Time %`' = t 4� AM-/Pm,,,/ Re -Inspection required: Yets No When corrections have been made, call for re -inspection at 303-234-5933 Date: ,d 7d ~- Inspector: 63; ) DO NOT REMOVE THIS NOTICE City of Wheat Ridge f Residential Plumbing PERMIT - 201708334 PERMIT NO: 201708334 ISSUED: 10/16/2017 JOB ADDRESS: 3001 Sheridan BLVD EXPIRES: 10/16/2018 JOB DESCRIPTION: Residential plumbing replacement of 40,000BTUs, 40gallon water neater, like for like *** CONTACTS *** OWNER (303)233-1992 ANDERSEN ROBERT MOHAN SUB (303)766-7500 Jeff Belk 021818 Plumbline Services *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: R-3 / Residen-ia' SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 3,000.00 FEES Hot Water Heater 40.00 Total Valuation 0.00 Use Tax 63.00 ** TOTAL ** 103.00 *** COMMENTS *** *** CONDITIONS *** All work shall comply 2012 International Codes, 2014 NEC (if applicable), and ordinances adopted by the City of Wheat Ridge. Work is subject to field inspections. I by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications; applicable building codes, and al( applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with this permit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed and that all work to be performed is disclosed in this document and/or its' accompanying approved pIans and specifications. Signature of OW��CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to Field inspection. Signature of Chiefld� 1 Date REQUESTS MUST BE MADE BY 11:59PM DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. »" City of Wheat j,dge COMMUNITY DEVELOPMENT Building & Inspection Services Division 7500 W. 29`h Ave., Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permits ci.wheatridge.co.us FOR OFFICf. USE ONLY Date: // /7 Plan/Permit # X1/7 Plan Review Fee: 1103,00— Building Permit Application *** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. **" Property Address: •3C)ok 'S'keroAwn 214r) Property Owner (please print): Ian \M 1\..rQer:ten Phone: 3 ) a3�- lacS� Property Owner Email: Mailing Address: (if different than property address) Address: City, State, Zip: Architect/Engineer: Architect/Engineer E-mail: Phone: Contractor: ? \j, 0o, ,,4,%P Se;-vVc e S Contractors City License #: n -A- 19 L 8 Phone: Contractor E-mail Address: l�errn.i',� t�l�.ntnb•n(�sEryu; GS : cc M Sub Contractors: Electrical: W.R. City License # Other City Licensed Sub: City License # Plumbing: W.R. City License # Other City Licensed Sub: City License # Mechanical: W.R. City License # Complete all information on BOTH sides of this form ❑ COMMERCIAL X, RESIDENTIAL Description of work: (Check all that apply) ❑ NEW COMMERCIAL STRUCTURE ❑ ELECTRICAL SERVICE UPGRADE ❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING ❑ COMMERCIAL ADDITION ❑ RESIDENTIAL ROOFING ❑ RESDENTIAL ADDITION ❑ WINDOW REPLACEMENT ❑ COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT ❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT ❑ ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT ❑ OTHER (Describe) (For ALL projects, please provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc.) Re pace x-10 c �11�9n W'a }er- 1keQt Ves Sq. Ft./LF Btu's Amps Squares q 6 t,� Gallons Other Project Value: (Contract value or the cost of all materials and labor included in the entire project) $ 3ooc) OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the truthfulness of the information provided on the application. CIRCLEONE: (OWNER) (CONTRACTOR) or (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR) L Electronic Signature (first and last name): —y-- , �/ DATE: 10 1 t 3 I ZONING COMMMENTS Reviewer BUILDING DEPARTMENT COMMENTS: Reviewer DEPARTMENT USE ONLY OCCUPANCY CLASSIFICATION: Building Division Valuation: $ i CITY OF WHEAT RIDGE Building Inspection Division (303) 234-5933 Inspection line (303) 235-2855 Office • (303) 237-8929 Fax INSPECTION NOTICE Inspection Type: 1� FT Job Address: 3001 5 hen'd-g/7 44 Permit Number: 201704119-t-1 ❑ No one available for inspectio Time i� AM/PM Re -inspection required: Yes No When corrections have been made, call for re -inspection at 303-234-5933 Date: Inspector: M r# DO NOT REMOVE THIS NOTICE b City of Wheat Ridge �. Residential Electric PERMIT - 201.704154 PERMIT NO: 201704154 ISSUED: 07/17/2017 JOB ADDRESS: 3001 Sheridan BLVD EXPIRES: 07/17/2018 JOB DESCRIPTION: Residential electrical replacement 125 amp subpanel like for like *** CONTACTS *** OWNER (303)233-1992 ANDERSEN ROBERT MOHAN SUB (303)766-7500 Jeff Belk 021818 Plumbline Services *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: R-3 / Residential SUBDIVISION CODE: 2412 / LAKESIDE, STEWART GARDENS, OLI BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 2,500.00 FEES Total Valuation 0.00 Use Tax 52.50 Permit Fee 93.35 ** TOTAL ** 145.85 *** COMMENTS *** *** CONDITIONS *** Must comply w/ 2012 IRC & 2014 NEC. Subject to field inspection. I by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with thisermit. I further attest that I am legally authorized to include all entities named within this document as parties to the work to be performed and that all work tr �erformed is disclosed in this document and/or its' accompanying approved plans and specifications. 7/17117 Signature of OWNER or CONTRACTOR (Circle one) Date 1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees and procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of an manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any provision of any applicable co any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. A , ' City of W heat R�e r C ommu ry DEVELOPMEN r Building & Inspection Services Division 7500 W. 29" Ave, Wheat Ridge, CO 80033 Office: 303-235-2855 * Fax: 303-237-8929 Inspection Line: 303-234-5933 Email: permits(aci.wheatridge.co.us FOR OFFICE USE ONLY Date:.� l Plan/Permit Plan Review Fee: �- Building Permit Application *** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. **" Property Address: -1601 Sher, LQC4 n `ilX Property Owner (please print): T_��,W A rjerS'3 n Phone: Property Owner Email: Mailing Address: (if different than property address) Address: City, State, Zip: Arch itectiEngineer: Architect/Engineer E-mail: Phone: Contractor: Contractors City License #: Phone: 17( ,6,7 560 Contractor E-mail Address: pern,Sat@ jv%Ab1,*e sefi-vtitc.� coM Sub Contractors: Electrical: W.R. City License # Other City Licensed Sub: City License # Plumbing: W.R. City License # Other City Licensed Sub: City License # Mechanical: W.R. City License # Complete all information on BOTH sides of this form ❑ COMMERCIAL XRESIDENTIAL Description of work: (Check all that apply) ❑ NEW COMMERCIAL STRUCTURE NKIELECTRICAL SERVICE UPGRADE ❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING ❑ COMMERCIAL ADDITION ❑ RESIDENTIAL ROOFING ❑ RESDENTIAL ADDITION ❑ WINDOW REPLACEMENT ❑ COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) ❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT ❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT ❑ ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT ❑ OTHER (Describe) (For ALL projects, please provide a detailed description of work to be performed, including current use of areas, proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc.) Sq. Ft./LF Amps R--- PlaC e V)iS AAP Btu's Squares Gallons Other Project Value: (Contract value or the cost of all materials and labor included in the entire project) $ JSoo OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that 1 am the legal owner or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the truthfulness of the information provided un -the application. CIRCLE ONE: (OWNER) CONTRACTOR) orti (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR) Electronic Signature (first and last name): �'" DATE: ZONING COMMMENTS: Reviewer: BUILDING DEPARTMENT COMMENTS: Reviewer: DEPARTMENT USE ONLY OCCUPANCY CLASSIFICATION: Building Division Valuation: $ FOR OFFICE USE, ONLY gate; ,u, t 1 ,cel x i+C Building & Inspection Services Division @$ 7500 K 291h Ave., Wheat Ridge, CO 80033 Plan Review Few Office: 303-235-2855 * ax: 303-237-8929 Inspection Line: 303-234-5933 Email: errnts c€. eetrid e.cr.s Building Permit Application * Please tomplete all highlighted areas on both sides of this form. Incomplete applications mar not be Processed. *** Pest Address: . S Property Owner (please print}: , Phan : - 43 Property Owner Email: Address. City, State, i Architect/ Co 1 �� Contractors City License 1 Phone .-__1176--7'TOO Contractor E-mail P"" Electrical: Plumbing: Mechanical. W.R. City License ## W.R. City license # W.R. City License## Other City Licensed Sub: Other City licensed Sub: City License # City License # Complete all information on BOTH sides of this form Q COMMERCIAL PtRESIDENTIAL 0 NEW COMMERCIAL STRUCTURE ELECTRICAL SERVICE UPGRADE 0 NEW RESIDENTIAL STRUCTURE COMMERCIAL ROOFING 0 COMMERCIAL ADDITION 0 RESIDENTIAL ROOFING RESDENTIAL ADDITION 0 WINDOW REPLACEMENT COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.) RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc,) MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT & PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT OTHER (Describe) !SewetNe ,/art:9, AV�?rox, -AO' Sq. Ft LF Btu's Gallons Amps Squares Other Project Value.* (Contract value or the cost of all materials and labor included in the entire project) $__ 66, . O`ANER/C0NTR,,-kCT0R SIGNATURE OF UNDER AND AGREEMENT I hereby certi(v that the setback distances proposed by this permit application am accurate and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, casements or restrictions of record-, that all measurements shown and allegations made are accurate: that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application, that I am the legal owner or have been authorized by the legal owner of the property to perforin the described work and am also authorized by the legal owner of an} entity included on this application to list that entity on this application. 1, the applicant for this building penitapplication, warrant the truthfulness of the information provided on the application, CIRCLE OIVE� (OWNER) (COAITRACTOR) 4Lr (AUTHORIZED REPRESENTATIVE) of (OWNER) (C01VTRACTOR) Flectronic Simatt(first and last nanit): DAT]i . o~ WHEql ~ m City of Wheat Ridge COLORPResidential Mechanic PERMIT - 060651 PERMIT NO: 060651 ISSUED: 07/25/2006 JOB ADDRESS: 3001 SHERIDAN BLVD EXPIRES: 01/25/2008 DESCRIPTION: Replace A/c w/2.5 ton, 14 seerA/C&coi1. 150 Amp Service pane CONTACTS owner 303/233-1992 Bob/Sherry Anderson gc 303/980-5544 Stephen Korff 02-1935 Front Range Mechanical Service gc 303/980-5544 Stephen Korff 02-1935 Front Range Mechanical Service PARCEL INFO ZONE CODE: UA USE: r-3 SUBDIVISION: UA BLOCK/LOT#: 0/ FEE SUMMARY ESTIMATED PROJECT VALUATION: 4,325.00 FEES Permit Fee 144.70 im Total Valuation .oo Use Tax 77•85 TOTAL 222.55 Comments CiN of Wheat Ridge PRESCRIPT{VE ENERGY CO BOILE:itS 1 FIIRNACES A MW IMUM OF 90% AFUE (;AS WATER HEATERS A MINIMUM OF,60 ENERGY FACTOR ELECTRIC WATER HEATERS A MINIMUM OF.93 ENERGY FACTOR SETBACK THERMOSTAT REQUIRED (EXCEPT HYDRONIC HEAT) R-21 WALLS ■ RJ8 CEILINGS • R•19 CRAWLSPACES I hereby certify that the eetback distances proposed by this permit application are accurate, and do mt violate applicable ordinances, rules or regulations of the City of wheat [tidge or covenants, easementa or reetrictions of record; that all measurements ahown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I asaume full responeibility Eor compliance with the Wheat Ridge Building Code (I.B.C) and all other p [ Ridge Ordinancee) for work under this permit. Plans subject to field inspection. ~ ~J=- -1-2- 15 =06 of contractor/owner date 1. This permit was iasued in accordance with the provisions set forth in your application and is aubject to the laws of Che State of Colorado and to Che Zoning Regulations and Building Codes of wheat Rid9e, Colorado or any other applicable ordinances of the City. 2. This permit ehall expire if (A) the work auChorized ie not commenced within sixty (60) daya from iasue date or (H) the building authorized is suspended or abandoned for a period of 180 daye. 3. If [hie permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have been or will be made in the ori9inal plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes have been or if suspension or abandonmen[ exceeds one (1) year, full fees shall be paid for a new permit. 4. No work of any manner shall be done chat will change the natural flow of water causing a drainage problem. 5. Contractor shall notify the Building Inepector twenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card before proceeding with succeasive phases of the job. 6. The issuance of a permit or the approval of drawings and specifications aha11 not be construed to be a permit for, nor an a rof, u+Y vio a~~ of the provisions of the building codes or any other ordinance, law, rule or regulation. ply"nLdWY'ev]!ti+! s_eubjef,t,Ee'Sield inspections. Signature Building Offical INSPECTION REQUEST LINE: (303)234-5933 BUILDING OFFICE: (303)235-2855 REQUESTS MUST BE MADE BY 3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. F WHEqT O ,P ` o t? m C~~ORADO BUILIl17VG PERMITAPPLI~'.~4T`IC?N PropertyOwner: $eg+ S1%errly Q-u tfse/, PropertyAddress: 3ppt s{%Q,r;do,-% 13(t/J. Phone:3o3"A33' 1972 Conh'actor License No.: Z 1$ 3s Company: F'p,pn{- F~_s~ SNtv: ic,y. Phone:3o3- 4Db's"`r OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I Buildina Dent. Valuation Figure: $ City of Wheat Ridge Community Development Department Date: MINOR Building Permit Number: I hereby certify that the setback distances proposed by this permit appiication are accurele, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or reslrictions of recortl; that all measuremenLs shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for work under this permit. Plans subject to field inspection. (O W NER)(CO NTRACTOR): 7- Value:$ 14 zS•" Permit Fee:$ Plan Review Fee:$ Tatal:$ y5W Use of Space (description): 9rbkac& Itle, N%J~ 1.1Gp1 14Sur ;.f' ron Description of work: ~7,,,~aC / ~ " f~~~e` p' r~ Sq.Ft.added Electrical License No: 211$5- /Plumbing License No: Company:~f &J~/ht~~ ~ Company: Mechanical License No: .2 0 3r Company:.Firotr~ R.v51!_ pncfJwA~~ SeAN~ee.s • Expiration Date: Expiration Date: Expiration Date: Approval: Approval: Approval: (t) This pertnit was issued in acwrdance with the provisions sel forth in your application and is subject to the laws of the State of Cobrado and to the Zoning Regulalions and Building Codes of Wheat Ridge, Colorado or any olher applicable ordinances of the Ciry. (2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (8) the building authorized is suspended or abandoned for a period of 180 days. (3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes have been orwill be made in the original plans and specifcafions and any suspension or abandonment has nol exceeded one (1) year. If changes have been or if suspension orabandonment exceeds one (t) year, full fees shall be paid for a new permit. (4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem. (5) Contractor shall notify the Building Inspector iwenty-four (24) hours in advance for all inspections and shall receive written approval on inspection card before proceeding with successive phases of the job. (6) The issuance of a permit or the approval of drawings and specifcations shall not be wnslrued to be a permit for, nor an approval of, anyviolation of the provisions ofihe building codes or anyother ordinance, law, rule or regulation. All plan review is subJect to field inspections. Chief Buildina Official Building Permit PermitNumber ~ 19459 CTPYOF WHEAT RIDGE 11/7/2005 7500 Weet29TH Avenue vVhwttidp, co e0033 ` Inspecfion Line 303-235-2855 cuyotwt;mrsdar ( - 303•234-5933 Residential Mechanical pROPERTY 3001 sheridan blvd Unit: owNER: Robert Anderson (303) 233-1992 nescripaoo 1 Replace 60,000 btu fiuuace, coil and humidifier the furnace shall be a 90 min AFUE. FEES - Fees Use Tax Permit Fee Total Fees ~ ~`.3~`~~~.',/ IGONTRACTORS I I ~ Name License # Phone PositivelyfleciriC 19206 000423-1807 ' Westech Mechanical, Inc. 18745 000 986-0366 I ~ MbLQf Wheat idge PRESCRIPTIVE ENpRGY CODE BOILEPS ; fURNACES A MINIMUM OF 90°/, AFUE (iAS WATEk HEATERS A MINIMUM 0~ .6Q ENERGY fACTOR ELECTRIC WA?ER HEATERS A MINIMUM OF .93 EMERCaY FACTOR SETBACK THERMOSTAT REQUIRED (EXCEPT HYDRONIC HEAn R-21 WALLS • R-38 CEILINGS - R•19 CRAWLSPACEs Urtita: Occupancy: r-3 Walls: Roof: Stories: Sq Feet: a Ihe[tly eettl(r tIprt.tMeNIpW[ d4h. Propoud EY tGb perml[ aPPReatioo are mcuratq aod do oot vtolate applleable ordinmca, rula or neehtlmu of the LYty af K'M1O<HWp orervmoY, etlenmb or reeMCllovj of reeortl; W[ vll mueurtmrnb Mowo, anA ollegatbm matle ve ucunh; Na1 [ hrve read aod apa lo ab1Ae by 'i WroMitleuq{~i! Imibb~pylleaHOn,aodfhatlmometWlrcapouqbWyformmpll~nuwiththeWAactRidG<ButltlineCOtle¢.B.C.)aed~iotherapplk~bk ~ Wbe~tBW[ o wowkuetlerNbMemit. / 11,17 D TE 1. peeWtwe ImN In mcorMoce with Ne proWlom .t forfh io yavr ~pp1lmUOn and 6 aubject to the Ivws of the Stah of CobrWo aod ro Ne Zovinp , RryoBlbdflnABu11~6CadeotWhea[RldgqColondoor.uyoNttappOCabkordinmcuofNeClty. l Every peroll Yeued shW berome InvWd uoms Ne work on tbe elte ouNOrizM Uy iucM1 psrni[ u roounenced wlthin 180 Jay.afler IU lae~na, or if We work wNwlmd oatheWe.Oy weh permit 4 ewpeeEetl or obaoDOOM 4r a period of 180 tlaya .Ner Ne Ume ofwork 6 wmmeoced. )IIOY plmY.!#plm, a new yerMt mry be oryu4ed tor a Re ofooo-6alf Ne amoum normAy nqulretl, proviEed no cMnea heve bnn w wW be made In We o11gbaFpiwwd qM6ptlov aod my aurpuuloo or ~mndamosut ha oot exaMed one (q yuc If c~aoeo m wde or If mipemlon wobmdoomeut exeKh qeplJar, NYfmNJlbeptltlfora oewperoJt. v/ NU wM, o(W atoosr sha0 ba doee tba[ wW chmte the nrtunl ibw of wahr cowlne a dninvge probkm. SGoymitetar WC moeft Ihe BWItlWe Inupenor tweaty-four (]A) poun In mAvmee for N IncpeNOU antl Aall rettive wAnm approvN ov Impectlw nrtl bekn 0 ^ b' • w the pprovd o mE epecitir~tbm shdl not be romtrved to be c permitlor, ppmv+l of, my vbhdbn otthe SYav ortlioaoeR Vw, ruk or nCdatbn. .CwBeffidV[laqueea, S[GNEDDATE 'Monday, Nowember 07, 2005 Page 1 of 1 COMMUNI'TY DEVELOPMENT DEPARTMENT Building Pertnit Number. ;of ~r,p gU1LDING INSPECTION LINE -303-234d933 Date: ~ CITY OF WHEAT RIDGE " 7600 WEST 29TH AVENUE WHEAT RIDGE, CO 80033 - (303-236-2865) APPLICATION Proper[y Owner:~~~ ~iile.vnn/$y~~~r r,nperry waaress: rnone: ~7r-]z- Zh 9 z-. ContractorLicenseNo.: Company:~~.-~ Phone: / GUC/ 7 SIGNANRE OF UNDERSTANDING AND AGREEMENT I Buildina Dept Valuation Figure: I hereby certify that the setback distances proposed by this pemit appliption are accurate, and do not violate applicable ortlinances, rules or regulatlons otthe City of Wheat Ritlge or covenants, easemeMS or restrictions of reoorcl; ihat all measurements shown, and allegations made are accurate; that I have read and agree to abitle by all conditlons pnnted on this application aM that I assume tull responsibility for compliance with the Wheat Ridge BuiWirg Cotle (I.B.C) and all oMerapplicable Voieat Ridge OMinances, for work urMer this pertniM~s subjed to field inspection. (OwNER)(CQUIBACTORL SIGNE DATE (OWNER)(CONTRACTpR):PRINtED /l e12 /!///!LI_.~sc.~tlaTEl~ Permit Fee:$ Plan Review Fee:$ USC T3X:$ Tota'.$ Use of Space (description): Description of work: lww,.E /~oDD %i'Z/ Sq. FL added COMMENTS: Approval: Zoning: !`ING COMMENTS. ApprovaP. wORKS CcMrOruTS: AFNiuvai: BUILDING DEPARTMENT USE ONLY DEPARTMENT COMMENTS: Approval: Walls: Roof: Stories: Electrical License No: l l lVIv Plumbing License No: Mechanical License No: #Y777 Company:/Pc5/T/✓ELy6'GCtT2/L Company: Company: 303- yz3 - lgn-7 Expiration Date: Z/~ /Z007 Expiration Date: Expiration Date: 2//y/zoD~p Approval: / ~ Approval: Approval: (1) This permit was issuetl in accor0ance with the provisions set forth in your application antl is subjeclto the laws ofthe State of Coloredo and to the Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other appliwble ortlinances of the City. (2) This pemit shall expire'rf (A) the woric authorizetl is not commenced within sixry (90) days from issue tlate or (B) the building authorized is suspentletl or abantlorred for a period of 180 days. (3) Ii this permit expires, a rrew permit may be acquired for a tee of one-hatf Me amouM normally required, provided no changes have been orwillbe made in the original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes have been or if suspension or abandonment exceeds one (1) year, tull tees shall be paid for a new permit. (4) No work of any manner shall be tlone that will Uange the natural 8ow of water causing a tlrainage problem. (5) ConVactor shall notify the BuiWing Inspector twenry-tour (24) hours in advance for ail inspections aM shall receive written approval on inspection card before proceetlirg wiM successive phases of fhe job. (6) The issuance ot a pemit or tfie approval oi drawings arW specifications shall not De constnred to be a pemit for, nor an approval of, any violation of the provisions of the building cotles or any other ordinance, law, rule or regulation. All plan revlew Is subJect to fleltl InspeMbns. Chief Building Official n N n~ 0 ~ o~wd . ws ~ m A n N 0 W (CD7 ~ W O ~ N S < ~(D CD ~~~y ~ N ~ , N v ~ n_. a \ a r~ r ~ b L. 0 ~ a C (D N ♦ / ~ o CDZ cD W 0 ~ o v r+ ~ cn m 0' w CD < ~ ZN ~ o N v, v9 = <z 0 (D 'v ~ COMMUNITY 7500 wES7 29tn AvENUE DEPAR BUMENT ILD N~ IN PECTION D VISION DEVELOPMENT PERMIT N0. 287-6944 EXT. 255 P.O. BoX 838 CITY OF WHEAT RIDGE, COlO. THIS PERMIT VALID ONLY WHEN SIGNED BY THE CNIEF BUILDING INSPECTOR AND RECEIPTED BELOW. JOB ADDRESS CONTRACTOR C/'Cr /IC-C ,r[~ZrI~-.u«.r-~ orsi rn = ADDRESS A Y- F D S/ M N/ S CITY~S..~~ 01~ N/ ZiP CODE v¢D I PHONE 6) b l LICENSE NO OWNER '~5~~~~5 /F~NnDE",uNA 1- 1- A d DDRESS 3 o D j C/G ~ -c-IL/ PHONE ZIP CODE CONTRACT PRICE $ ~ D 1. TVPE Ground❑ Wall❑ ProieclinpU OtMr SaDFOCe 2. MATERIAL Totol Squon FoN SIGNS 3. ILIUMINATION Yes❑ No❑ Typa 4 SET BACK FROM PROPERTY LINE N_ 5__ E_ j (SVecifYwhichiatront) ❑ ❑ ❑ INSPECTION TICKET 1. TYPE SolidO Mon TMn 80% Open[] Ln. JOB Y. MATERIAL ADDRESS 3 U d fENCES 3 SET BACN FROM PROPERTY LINE N_ 5_ E_ (Specify which ie tront) ❑ ❑ ❑ OTHER IZ' 3. DATE: BLDG. PERMITM 3 FS,T- DRAW SKETCH OR SHOW BELOW,THE FENCE,SIGN,OR OTHERSTRUCTURE gLDG (SETBACKS OR PROJECTIONS INCLUDED) PERMIT FEE SUBCONTRACTOR DATE INSP. REQ._ v" a~ V -V TYPE OF INSR INSPECTION MADE ! Z REMARKS STREE? NAME SHOW DISTANCES FROM THE MAIN BUILDING TUAWOINING HOUSES, STRE W.R.FORM &79 DISTANCE TO PROPERTY LINES, NOT MAXIMUM OR AVERAGE DiSTANi k.`r'pLiCATIJN FOR PLUM8ING; ELEC THIS APPLICATION WILL BECOME A PERMIT TO PERFORM THE INDICATEO F'ERASlT S4il.L EXGIRE 60 DAYS FROM 0.5'PE OF IS$UANi,c :r - SION. ELECTRICAL PERMIT STATE LICENSE N0. PLUMBING PERMIT STATE UCENSE N0. MECHANICAL PERMIT ~,lil~rti~~t;~"F.~REU'~DFRSIY.E31LlEGAL FLOOR BSM IST 2ND 3R0 4TH NQ ROPa~ EI*eSola FLEVCirtleOneCoF d1 11 Np. WATER CLDSET FORCED AIR - BTU TEMPORARY METER WASH BOVIL HOT WATER - BTU NEW SERVICE - AMPS CHANGE SERVICE-AMPS LIGHTING BATH TUB SMOWER SINK STEAM - BTU AIR CONDITIONING-BTU • O DO OTHER HEATING GARBAGE DIS? REFRIGERATpN SYSTEM POWER SUB-GFCUITS UTiUTY(RANGE,DISPOSER,ETC) FIXTURES WATER HEATER AUTO. WASHER DISH WASHER Refri sroM Gou Pounds Ch0f • AUTOMATIC SPRINKLER SYSTEM WIRING MOTORS 6 CONTROLS FLDOR DRAIN ELEVATOR SIGNS URINAL TRANSFORMERS 9 RECTFIERS SEWERS ADDITION TO OLD WORK OTHER MOTORS OVER I HP TOTAI FIXTURES I hareby acknowlsdqe fhat Ihia ap0liCo- tion is eorrect ond understand thaf I eannot atarf this projeet uniil this appli- cofion is aDProveA. I shall tomply with iha lows ot the Stote of Colorado and to }hs ZoninQ Fepufationa ond Builtlinp Code of the City of Wheai Ridqe. Any violafion of the abovs terme will cause immediate ravoootion of this permit. t 1011i onlt i0na~m~ USE TAX PERMITM CONTR._ •oQ I TOTAL FEE I$ 5J •L9D I CHIEF BUILDING ,Cityaf Wheat Ridge Dote Issued ~ 1 NOT VALID UNLESS RECEIPTED lw4gaP c% 1-79O pS . ob~1 CAL1237-8944 EXT.255 24 HOURS IN ADVANCE FORINSPECTIONS tnf ~ o~ m N 7 W n A p ~ ~ tD N W C7 o W O 7 . N 3 ~ m 6 N 7 C1 a m n 0 ~ ~ N \ 9 <D ~ ci 0 ~ ~ ~ L O Q a a ~ A N N ~ `I r~ "t ~ `I ~ 0 7 ~ 5 N '0 (D 0 W = 0 w N w ~ N ~ ~ ~ n ~ n 0 ~ Z m C m r ~ ~ ~ •v m ~ ~ n• m N v , _ 0 ~