Loading...
HomeMy WebLinkAbout6010 W. 40th Avenue' City of Wheat Ridge Residential Roofing PERMIT - 201706217 PERMIT NO: 201706217 ISSUED: 08/16/2017 JOB ADDRESS: 6010 W 40th AVE EXPIRES: 08/16/2018 JOB DESCRIPTION: Residential Re -roof to install Elastomeric roof coating and sprayed polyurethane foam roofing(spf) - 37 sq (flat only) *** CONTACTS *** OWNER (303)233-6044 JARVIS GEORGE L CO TRUSTEE SUB (303)906-9128 Global Roofing 150234 Global Roofing LLC *** PARCEL INFO *** ZONE CODE: UA / Unassigned USE: UA / Unassigned SUBDIVISION CODE: 100 / Apartments BLOCK/LOT#: 0 / *** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 35,000.00 FEES Total Valuation 0.00 Use Tax 735.00 - ---- Permit Fee 557.05 ** TOTAL ** 1,292.05 *** COMMENTS *** *** CONDITIONS *** Effective December 1, 2014, asphalt shingle installations require an approved midroof inspection, conducted when 25-75 percent of the roof covering is installed, prior to final approval. Installation of roof sheathing (new or overlay) is required on the entire roof when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and mid -roofs may be called in at the same time, one hundred percent of the sheathing must be complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave and secured in place is required to be provided for all roof inspections. Roof ventilation is required to comply with applicable codes and/or manufacturer installation instructions, whichever is more stringent. In order to pass a final inspection of elastomeric or similar type roof coverings, a letter of inspection and approval from the manufacturer technical representative stating that "the application of the roof at (project address) has been applied in accordance with the installation instruction for (roof material brand name) roof covering" is required to be on site at the time of final inspection. Roof inspections for ROOFS OVER 6/12 PITCH: 3rd party inspection will be required, the 3rd party inspection report will be collected at final roof inspection performed by City of Wheat Ridge. If report is not available the final inspection will not be completed. City of Wheat Ridge Residential Roofing PERMIT - 201706217. PERMIT NO: 201706217 ISSUED: 08/16/2017 JOB ADDRESS: 6010 W 40th AVE EXPIRES: 08/16/2018 JOB DESCRIPTION: Residential Re -roof to install Elastomeric roof coating and sprayed polyurethane foam roofing(spf) - 37 sq (flat only) I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications, applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized by the legal owner of the property and am authorized to obtain thispermit and perform the work described and approved in conjunction with this permit. I further attest that I am le ally authorized to include all entities named within this document as parties to the work to be performed and that ork a pe rmed is disci ocument and/or its' accompanying approved plans and specifications. Signature of '�r CONTRACTOR (Circle one) Date I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures. 2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building Official and may be subject to a fee equal to one-half of the originalpermit fee. 3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of the Chief Building Official and is not guaranteed. 4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval. 5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services Division. 6. Theis r granting of a permit sha11 n t be construed to be a permit for, or an approval of, an violation of any provision of any applica e c opr�a�n�y ord�nar¢�'or re u9at n of this jurisdiction. Approval of work is subject to field inspection. Signature of Chief Building Official Date REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY. Dan Schultz `'706 Z From: Sent: no-reply@ci.wheatridge.co.us Monday, August 14, 2017 4:29 PM To: CommDev Permits c^ Subject: Online Form Submittal: Residential Roofing Permit Application Cr_ Follow Up Flag: Follow up Flag Status: Completed Categories: Danny D Residential Roofing Permit Application This application is exclusively for new permits for residential roofs and for licensed contractors only. This type of permit is ONLY being processed online --do not come to City Hall to submit an application in person. Permits are processed and issued in the order they are received and due to the volume of requests, time to process varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if your contractor's license or insurance has expired, and you may update those documents at the time you are issued your permit. For all other requests: Homeowners wishing to obtain a roofing permit must apply for the permit in person at City Hall. Revisions to existing permits (for example, to add redecking) must be completed in person at City Hall. All other non -roofing permits must be completed in person at City Hall. The Building Division will be open from 7:30-10:30 a.m., Monday through Friday to process these types of requests. THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN REROOFING UNTIL PERMIT HAS BEEN ISSUED. Is this application for a Yes LlG �Ai vtl- residential roof? How many dwelling units Single Family Home are on the property? PROPERTY INFORMATION Property Address 6010 West 40th Avenue, Wheat Ridge, CO 80033 Property Owner Name George Jarvis 233 11 1, M1,051 Property Owner Phone Number (enter WITH dashes, eg 303-123-4567) Property Owner Email Address Do you have a signed contract to reroof this property? Applications cannot be submitted without an executed contract attached below. Attach Copy of Executed Contract 303-233-6044 Field not completed. Yes Jarvis George 6010W40thAve Signed Contract. pdf CONTRACTOR INFORMATION Contractor Business Global Roofing Name D6— Contractor's License 150234 Number (This is a 5 or 6 digit number for the City of Wheat Ridge) Contractor Phone Number (enter WITH dashes, eg 303-123-4567) Contractor Address (Primary address of your business) 303-906-9128 8025 West Colfax Avenue Lakewood, CO 80214 Contractor Email Address globalroofingllc@gmail.com Retype Contractor Email Address DESCRIPTION OF WORK TOTAL SQUARES of the entire scope of work: Project Value (contract value or cost of ALL materials and labor) global roofingllc@gmail.com 234 Are you re -decking the roof? Does the scope of the project include a flat roof (less than 2:12 pitch)? How many squares are part of the flat roof? Describe the roofing material for the flat roof: Type of material for the flat roof. Does the scope of the project include a pitched roof (2:12 or greater pitch)? Provide any additional detail here on the description of work. (Is this for a house or garage? What is the roof pitch? Etc) No� Yes 37 Elastomeric roof coating & Sprayed Polyurethane Foam Roofing (SPF) TPO/EPDM No re roof of house SIGNATURE OF UNDERSTANDING AND AGREEMENT I assume full Yes responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application. I understand that this Yes application is NOT a permit. I understand I will be contacted by the City to pay for and pick up the permit for this property. I understand that work Yes may not begin on this property until a permit 235 has been issued and posted on the property. I certify that I have been Yes authorized by the legal owner of the property to submit this application and to perform the work described above. I attest that everything Yes stated in this application is true and correct and that falsifying information in this application is an act of fraud and may be punishable by fine, imprisonment, or both. Name of Applicant Calvin Ames Email not displaying correctly? View it in your browser. 236 Global Roofing -=I Global Roofing & Construction 8025 West Colfax Avenue Lakewood, CO 80214 (303)906-9128 globalroofingllc@gmail.com Client: George Jarvis Property: 6010 West 40th Avenue Wheat Ridge, CO 80033 Operator: GLOBALRO Type of Estimate: Roof Date Entered: 6/8/2017 Date Assigned: Price List: CODE8X_MAY17 Labor Efficiency: Restoration/Service/Remodel Estimate: JARVIS_601OW40THAVE File Number: 060163R38 Home: (303) 233-6044 Thank you for requesting the following estimate for your construction and/or roofing project. All estimates are valid basad on material costs for 30 days from the estimate. Please let us know what questions you have. We look forward to working with you in the near future. AL 0' 5�hA� -L Global Roofing Global Roofing & Construction 8025 West Colfax Avenue Lakewood, CO 80214 (303) 906-9128 globalroofingllc@gmail.com R2 JARVIS 601OW40THAVE DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 1. Elastomeric roof coating - Flat roof 3,708.52 SF 0.00 2.15 323.38 8,296.70 2. Drip edge 148.28 LF 0.00 1.98 7.59 301.18 3. R&R Rain cap - 6" 4.00 EA 4.27 35.92 6.72 167.48 4. R&R Sprayed Polyurethane Foam 3,708.52 SF 0.64 5.38 525.13 22,850.42 Rooting (SPF) Totals: R2 862.82 31,615.78 Garage 1 DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 5. R&R Gutter / downspout - 101.46 LF 0.43 5.36 16.88 604.34 aluminum - up to 5" Totals: Garage 1 16.88 604.34 Garage 2 DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 6. R&R Gutter / downspout - 99.86 LF 0.43 5.36 16.62 594.81 aluminum - up to 5" Totals: Garage 2 16.62 594.81 Front Elevation DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 7. R&R Downspout - aluminum - up to 58.50 LF 0.43 5.36 9.73 348.45 5" 8. R&R Gutter - aluminum - up to 5" 51.75 LF 0.43 5.36 8.61 308.24 Totals: Front Elevation 18.34 656.69 JARVIS_6010W40THAVE 6/8/2017 Page:2 1 Global Roofing GQ 13AL Global Roofing & Construction 8025 West Colfax Avenue Lakewood, CO 80214 (303)906-9128 globatTOOfingllc@gmail.com Right Elevation DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 9. R&R Gutter / downspout - 71.33 LF 0.43 5.36 11.87 424.87 aluminum - up to 5" Totals: Right Elevation 11.87 424.87 Rear Elevation DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 10. R&R Gutter / downspout - 53.25 LF 0.43 5.36 8.86 317.18 aluminum - up to 5" Totals: Rear Elevation 8.86 317.18 Left Elevation DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 11. R&R Gutter / downspout - 66.58 LF 0.43 5.36 11.08 396.58 aluminum - up to 5" Totals: Left Elevation 11.08 396.58 Debris Removal DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 12. Haul debris - per pickup truck load 1.00 EA 131.74 0.00 0.00 131.74 - including dump fees Totals: Debris Removal 0.00 131.74 Labor Minimums Applied DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 13. Roofing labor minimum 1.00 EA 0.00 184.62 0.00 184.62 Totals: Labor Minimums Applied 0.00 184.62 Line Item Totals: JARVIS_601OW40THAVE 946.47 34,926.61 JARVIS_6010W40THAVE 6/8/2017 Page:3 Global Roofing Global Roofing & Construction 8025 West Colfax Avenue Lakewood, CO 80214 (303)906-9128 globalroofingllc@gi-nail.com Additional Charges Charge Permit 200.00 Additional Charges Total $200.00 JARVIS_6010W40THAVE 6!812017 Page:4 Global Roofing Global Roofing & Construction 8025 West Colfax Avenue Lakewood. CO 80214 (303)906-9128 globalroofingllc@gmail.com Summary Line Item Total 33,980.14 Permit 200.00 Material Sales Tax 946.47 Replacement Cost Value $35,126.61 Net Claim $35,126.61 JARVIS_601OW40THAVE 6/8/2017 Page:5 GL Q �2h LL Global Roofing Global Roofing & Construction 8025 West Colfax Avenue Lakewood, CO 80214 (303)906-9128 globalroofingllc@gmail.com Recap of Taxes Material Sales Tax (8%) Manul% Home Tax (8%) Storage Rental Tax (8%) Local Food Tax (5.1%) Line Items 946.47 0.00 0.00 0.00 Additional Charges 0.00 0.00 0.00 0.00 Total 946.47 0.00 0.00 0.00 JARVIS_601OW40THAVE 6/8/2017 Page:6 GL Global Roofing Global Roofing & Construction 8025 West Colfax Avenue Lakewood, CO 80214 (303) 906-9128 globalroofingllc@gmail.com Recap by Room Estimate: JARVIS_6010W40TRAVE R2 Garage 1 Garage 2 Front Elevation Right Elevation Rear Elevation Left Elevation Debris Removal Labor Minimums Applied Subtotal of Areas Total 30,752.96 90.50% 587.46 1.73% 578.19 1.70% 638.35 1.88% 413.00 1.22% 308.32 0.91% 385.50 1.13% 131.74 0.39% 184.62 0.54% 33,980.14 100.00% 33,980.14 100.00% JARVIS_6010W40THAVE 6/8/2017 Page:7 Global Roofing Global Roofing & Construction 8025 West Colfax Avenue Lakewood, CO 80214 (303)906-9128 globalroofingllc@gmail.com Recap by Category Items Total % GENERAL DEMOLITION 2,738.45 7.80% ROOFING 28,547.05 81.27% SOFFIT, FASCIA, & GUTTER 2,694.64 7.67% Subtotal 33,980.14 96.74% Permits and Fees 200.00 0.57% Material Sales Tax 946.47 2.69% Total 35,126.61 100.00% Thank you for your business. Please don't hesitate to contact us with any questions. Global Roofing Calvin Ames (303) 906-9128 This agreement is hereby made and entered on 6/8/2017 by and between George Jarvis hereafter called Homeowner, and Global Roofing, hereafter called Contractor. The said parties, for the considerations hereinafter mentioned, hereby agree to the following: 1. The Contractor will install new roof and/or other home repairs at Homeowner's property upon approval of insurance; claim by Homeowner's Insurance Company. 2. The Contractor agrees to provide all of the material and labor required to perform the following work described in this estimate prepared by Contractor and provided to the Homeowner, which is identified by the signatures of the parties to this agreement and which form a part of this agreement. 3. The Homeowner hereby agrees to pay the Contractor, for the aforesaid materials and labor, the sum 35,126.61 with initial insurance check due as down payment prior to the commencement of work. Homeowner shall endorse over all insurance proceed checks to Contractor, including any supplement or supplemental payments made by the Homeowner's Insurance Company. Payments made by credit or debit card are subject to a 3% transaction fee. All checks should be made out to Global Roofing Billing & Supply. 4. If Homeowner's Insurance Company does not approve a complete replacement value roof claim, this Contract will be null and void and Homeowner shall owe Contractor nothing. Contractor will consider partial roof replacements on an individual basis. THE ONLY COST TO HOMEOWNER WILL BE THEIR DEDUCTIBLE, in addition to any non-recoverable depreciation. Any code upgrades not covered by the Homeowners insurance policy that are required per local building code will be paid by the homeowner upon job completion. 5. The Contractor agrees to provide and pay for all materials, tools and equipment required for the prosecution and timely completion of the work. Unless otherwise specified, all materials shall be new and of good quality. 6. In the prosecution of the work, the Contractor shall employ a sufficient number of workers skilled in their trades to suitably perform the work. 7. The Homeowner, Homeowner's representative, Contractor, and public authorities shall at all times have access to the work. 8. The Homeowner agrees to maintain full insurance on the above-described property during the progress of the work. 9. In the event the Contractor is delayed in the prosecution of the work by acts of God, fire, flood or any other unavoidable casualties; or by labor strikes, late delivery of materials; or by neglect of the Homeowner; the time for completion of the work shall be extended for the same period as the delay occasioned by any of the aforementioned causes. 10. The Contractor agrees to obtain insurance to protect himself against claims for property damage, bodily injury or death due to his performance of this agreement. 11. Neither the Homeowner nor Contractor shall have the right to assign any rights or interest occurring under this agreement without the written consent of the other. JARVIS_601OW40THAVE 6/8/2017 Page:8 Global Roofing Global Roofing & Construction 8025 West Colfax Avenue Lakewood, CO 80214 (303)906-9128 globalroofingllc@gmail.com 12. This agreement shall be interpreted under laws of the State of Colorado. 13. Attorney's fees and court costs shall be paid by the defendant in the event that judgment must be, and is, obtained to enforce this agreement or any breach thereof. 14. All work comes with a five year workmanship warranty upon completion of work. All materials shall be warranted per manufacturer's guidelines. 15. Outstanding balances are due within 21 days of completion. Inspections are not required to be completed before payment is due. All late payments are subject to a daily fee of $25. All returned checks will be charged a $50 fee in addition to any bank charges resulting from returned check. 15. Any installed satellite dishes will need to be adjusted and calibrated by your service provider. IN WITNESS WHEREOF, the parties hereto A their hands and seals the day and year written above. Date % Georg Jarvi ->Z-17 obal Roofing Down Payment Amount Materials Manufacturer 'b-�'4�+ %1 JARVIS 601OW40THAVE Shingle Color .914e.4 6/8/2017 Page:9 DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : 13160 BUILDING INSPECTION LINE - 303-234-5933 CITY OF WHEAT RIDGE Date : 11/21/01 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 - (303-235-2855) Property Owner: JARVIS PROPERTIES & MGMT. Property Address : 6010 W 40TH AVE Contractor License No. : 20737 Phone : 233-6044 Company : AIR CURRENTS INC. Phone : 720-937-7158 OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions o rd; that all measurements shown, and allegations made are accurate; that I have read a d ag ee to abide by all conditions printed on this application, and that I assume full res o" o ' ce ' eat Ridge Building Code (U.B.CJ and all other applic Rid ordinances, forw nder this per it. (OWNER)(CONTRACTOR) SIG E DATE 0 ConstructionValue: $1,150.00 Permit Fee : $44.85 Plan Review Fee : $0.00 Use Tax : $17.25 Total: $62.10 Use: Description : REPLACE 75,000 BTU FURNACE BUILDING DEPARTMENT USE ONLY SIC : Sq. Ft. : Approval : Zoning : Approval : I Approval: Occupancy : Walls : Roof : Stories : Residential Units : Electrical License No : Plumbing License No : Mechanical License No : 20737 Company : Company : Company : AIR CURRENTS INC. Expiration Date : 11/6/02 Expiration Date : Expiration Date : Approval : OK/KS Approval: Approval: (1) This permitwas issued in accordance with the provisions set fodh in yopur application and is subjecl to the laws oFthe State of Coloredo and to the Zoning Regulations antl Builtling Cotle of Wheat Ridge, Coloredo or any o[her appiicable ordinances of the City. (2) This permit shall expire if (A) the work au[horizetl is not commenced within siaty (60) tlays from issue date or (B) the building authorizetl is suspended or abandoned for a period of 120 days. (3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normalty required, provided no changes have been or will he matle in the original plans antl specifications and any suspension or abandonment has not exceeded one (1) year. If changes are matle or iF suspension or abandonment exceeds one (1) year, fuli fees shall be paid fOr a new permit. (4) No work of any manner shali be done that will change ihe naturel Flow of water causing a tlrainage problem. (5) Contractor shail notiry the Building Inspector twenty-four (24) hours in advance for all inspedions and shall receive written approval on inspection card before proceetliing with successive phases of [he job. (6) The iss nce of a permit or the approval oF drawings and specifications shall not be construed to be a permit for, nor an approval of, any violation of the prov io of [ bg codes or any other ordinance, law, rule or regulation. C ief Buildin spector DEPARTMENT OF PLANNING ?.ND DEVELOPMENT Building Pemut Number: oF WHEqT y BiJII.DING INSPECTION LINE - 303-2345933 Date: CITY OF WHEAT RIDGE U m 7500 WEST 29TH AVENLTE ~o o WHEAT RIDGE, CO 80215 -(,3y0H3-235-2855) (ORAD 4`33~~UCAdd ON ProperlyOwner: Zh✓lS ftepu'h'=9 l491n1^, Property Address: 4 p/p 1'0 . 4-1O V'4- JQi/G Phone : 30 3-c) J'.~ OAly Contractor License No.: 9O 73 7 ~ OWNER/CONTRACTOR SIGNATURE nL Phone: AND AGREEMENT I Lereby certify that the setback distances proposed by ihis permit application aze accurate, md do not violate applicable ordiuances, mles or regutafions of ihe Ciry of PJheat Ridge or covenants, easements or restrictions of record; that all measucemeats showq md altegarions made aze accuxaze; ~ave read md agree to abide by all conditions printed on Uus applicatio d that I assume fiilt responsibiliry for compliance with ihe Wheat Ridge Bu it o C) and all o applicable V✓heat Ridge Ordinances, for work u 'F~iy ) (O WNER)(CONTRACTOR): It /8lAo / -9 3 7- 7iS8 Construction Value: '~ld-e ~ Pernut Fee: Plan Review Fee: Use Tax: TOt2l: Description: /lCPf4~~ 75SD8~ ~Ti~ f`-v!`nacG BUILDING DEPARTMENT USE ONLY SIC: Sq.Ft.: ZONING COMMENTS: Approval: Zoning: BUILDING COMMENTS: Approval: PUBLIC WORKS COMMENTS: Approval: Occupancy: Walls: Roof: Stories: ResidentialUnits: Electi-ical License No: Plumbing License No: Mechanical License No: Company: Company: Company: Expiration Date: Expuation Date: Expuation Date: Approval: Approval: Approval: (I) 11us pe:mit was issued in accotdance with the provisious set foRh in your appfication md is subject to the lawa of the Sffih of Colorndo md to We Zoning Regulations md Building Codes of Wheat Ridge, Cotorndo or eny other applica6le ordiaauces oftlie Ciry. TLis peemit slwll expire if (A) the work authorized is not rommenced wiUilc sixCi (EO) days 5om issce date o: (9) the building authorized is saspended or abandoned for a period of 120 days. ' (3) Iffhis pexmit expues, a new permit may be acquired for a fee of one-hatf the amountnorma}lyrequired, prwided no changes have been or will be made in the origi¢alplans andspeci5cafions andanymspeusion or abandonmenthas notexceededone (I) year. Ifchauges havebeen oi ifstupeasion or abandovment exceeds one (I) yeu, fiill fees slia116e paid for a new pecmit. (4) No work of any mmna shaLL be done that will chsnge fhe nawral flow of water causing a drainage problem. (5) Coahactashall notifytheBuildingInspectorrivrnty-fou:(24)houcsiaadva¢cefoxallinspecfionsandshallreceivewrittrnapprovalouinspectioncard6efore pmceedingwithsuccessivephuesofthejob. (6) The issuance of s peimit or the appxoval oFdrawiags and specificatio¢s s6all not be wnshued to be a pelmit for, nor an approval of, any violation of the provisions of the biulding codes or a¢y other ordinance, law, rvle or regulafion. Chief Building Inspectoi