Loading...
HomeMy WebLinkAbout10241 W. 38th AvenueThe City of 7500 WEST 29TH AVENUE WHEAT RIDGE. CO 80215-6713 (303) 234-5900 ~ h e at City Admia Fax # 2345924 _ Police Dept. Fax 7? 235-2949 GRid ge July 24, 1997 Mr. William Lyons CEP2g'IED MAIL # P963 361 192 Triton Development, L.L.C. 835 Delaware Street Denver, Colorado 80204 Re: Cambridge Park Subdivision, 10241 West 38th Avenue - Notice of Rejection for Future Phase 2 Temporary Certificate of Occupancy & Certificate of Occupancy Applications Dear Mr. Lyons, This letter is to inform you that as of this date the following issues, which Triton Development has been aware of during the past several months, have not been addressed to the satisfaction of the Public Works Department: l. The letter of certification, for the various drainage improvements, has not been received. As you are aware, Triton Development assured the City that this letter would be submitted, and agreed that temporary certificates or certificates of occupancy could be withheld for any units within phase 2 of this project, if this letter was submitted to the City for approval. As a reminder and for your information, I am including a copy of the map that this department has been, and will continue to use, for determining the phasing boundary: Despite this agreement; it has come to the attention of this department that three certificates of occupancy have been issued for lots 66, 68, and 69. These certificates are all within the phase 2 area of this project, and were never signed off as approved by the Public Works Department. 2. There is still a low area of asphalt along'the West 38th Avenue frontage and east of the present construction entrance that has not been properly repaired by Triton Development. Several verbal requests to the site's project manager, Mr. Barry Odean, have been made over the last several months to repair this problem. This area needs to have the existing asphalt removed because of the excessive time that water has been ponding. An asphalt patch (minimum 9-inches in depth) needs to be placed in accordance with City standards. Please notify the City at least 24 hours in advance prior to completing this work to set up an inspection and confirm licensing requirements for the contractor. Cp RECYGLED PAPER Mr. Bill Lyons Triton Development Page 2 3. A drainage problem has been created along the entire Miller Court frontage between the back of the new sidewalk and the new fence. Water from the operation of the irrigation system, drains to the low area described. This area need to be regraded as needed to properly convey flows from the Cambridge Park site that are adversely impacting this area. Please be aware that effective immediately, the City of Wheat Ridge will not accept any temporary certificate, or certificate of occupancy applications in Phase 2 of this development until such time as Triton Development has completed the above items to the satisfaction of the City. If you have any questions, please contact me at 235-2868. Sincerely, Bob 96ebe.l, P.E. Puba~ic W6rks Director Ci y En ineer _a / 4- Review Engineer GK cc: Robert Middaugh, City Manager - Jack Hurst, Interim Planning & Development Director Dave Kotecki, Sr. Project Engineer Meredith Reckert, Senior Planner John Eckert, Chief Building Inspector File . Y v~.) s-~ f ` kp ~ y U ~ [~c ~ i \ , ~ ~✓N.J~ *=,4t~ 7 ~ ~ tA 42eY`y34! ~4 C M t.. t. ry~ L 7`, ~ ~.£x :r~ f w~4~~£..1° z`~~ ri a~\ rc •J 3` 1 ~ ~ t~~~ v 8 ~ J v~~ ¢ t ~c i~~,~.~;a'~ ~ ~ Y a M b Y '',a'9 ~ ~ f ~ b ~ 15 r C [ ° . G, R x !W`4-4 . i.~.l M \ \ f F Q C- L ~ 6gF a~ i.{Y I.ar ` t+U M \,cS r k ~ Ct ~ R u ~t^ et ~ S.k:c ~ .A L. ~ =v t : hy i e; Q I ~ rv ~ l~y! U "a Q. c 'C ' Cambridge Park 0 - tDaA PR110 HOMES GH6cK Axedudedgaudcommmin• ~\~4~5~=~ 38~h 6 Millr. S~reu Whea~Riegr ~ < 9 SF ~ F 12-.raS3 ~q /~~1/.y~~ .f~ •."~yT - 3 Phase 1 R~ Phase 2 = This exhibit is fo be used for re{erence only. All lomlions are opxroximate. s 4036 57 qb 47 / 58 ~ - + a T ,.1 ~ ~ _ yse August 4, 1998 Triton Development c/o Greg Haiges 835 Delaware Street Denver, CO 80204 RE: Cambridee Park Additional information needed as of Auaust 3, 1998 Dear Greg, Below is a list of additional information needed to complete the files related to Cambridge Park Subdivision: ~ Lot 1, 3802 Lee Cir. ~ Lot 5, 3842 Lee Cir. ~ Lot 7, 3862 Lee Cir. ~ Lot 9, 3882 Lee Cir. ~ Lot 13, 3916 Lee Cir. ~ Lot 14, 3919 Lee Cir. ~ Lot 16,3899 Lee Cir. ~ Lot 17, 3875 Lee Cir. ~ Lot 18, 3849 Lee Cir. ~ Lot 19,3825 Lee Cir. ~ Lot 30, 3922 Lee Cir. ~ Lot 38, 3924 Lee Cir. ~ Lot 39, 3922 Lee Cir. ~ Lot 42, 3956 Lee Cir. ~ Lot 44, 3970 Lee Cir. ~ Lot 45, 3982 Lee Cir. ~ Lot 47, 4002 Lee Cir. ~ Lot 48, 4006 Lee Cir. ~ Lot 49, 4020 Lee cir. ~ Lot 50, 3989 Lee Cir. ~ Lot 52, 3955 Lee Cir. ~ Lot 53, 3949 Lee Cir. ~ Lot 54,3935 Lee Cir. ~ Lot 55, 4026 Lee Cir. ~ Lot 69, 4096 Lee Cir. Provide an engineer stamped foundation inspection. Provide an engineer stamped foundation inspection. House in utility easement, need utility company sign-off. Provide an engineer stamped foundation inspection. House in utility easement, need urility company sign-off. Provide an engineer stamped foundation inspection. Provide an engineer stamped foundation inspection. Provide an engineer stamped foundation inspection. Provide an engineer stamped foundarion inspection. Provide an engineer stamped foundation inspection. No Improvement Location Certificate provided. Provide an engineer stamped foundarion inspecrion. Deck in utility easement, need utility company sign-off. No Improvement Location Certificate provided. Provide an engineer stamped foundation inspection. Provide an engineer stamped foundation inspection. Provide an engineer stamped foundation inspection. House in urility easement, need utility company sign-off. Easements shown incorrectly on ILC. Provide an engineer stamped foundarion inspection. House in utility easement, need urility company sign-off. Provide an engineer stamped foundation inspection. Provide an engineer stamped foundarion inspection. Easements shown inconectly on ILC. Provide an engineer stamped foundation inspection. Provide an engineer stamped underdrain inspection report. * Provide an updated drainage report from Hepworth-Pawlak that states all their concerns have been addressed from their November 21, 1997 report. * Provide an engineer stamped foundation inspection for the house, only information submitted was for a garage. * Provide updated engineer's report from Martin Design Inc. stating all issues in their May 7, 1998 report has been addressed. ~ Lot7l, 4085 Lee Cir ~ Lot 72, 4065 Lee Cir. ~ Lot 74, 4035 Lee Cir. ~ Lot 76, 4015 Lee Cir. ~ Lot 77. 4005 Lee Cir. Provide an engineer stamped foundation inspection. House in utility easement, need urility company sign-off. Provide an engineer stamped foundarion inspecrion. Provide an engineer stamped foundation inspection. Easements shown incorrectly on ILC. Provide an engineer stamped foundation inspection. Provide an engineer stamped foundation inspection. Provide stamped Improvement Location Certificate. This additional information along with Drainage Certifications for each lot is required to be submitted to our office and approved before escrow will be released for any of the above referenced addresses/ lots. This is not a complete list of additional information needed to complete the enrire project, please submit the additional information when it is available. Other items still needing completion include the following: Off Site Improvements: l. Gate to recreation center 2. West side sidewalk (Miller Ct.) 3. Emergency entrance on west side (replace vertical curb) 4. Off site trail to 41 st Avenue (provide plans for review) 5. Sidewalk on 38th Avenue at construction entrance On Site Improvements: 1. Repairs of road base 2. Second lift of asphalt on east side 3. French drain system in phases I and II 4. Landscaping throughout phase II 5. Phase II sidewalks 6. Drainage Certifications by Cambridge engineer 7. Emergency conirol on main entrance gate 8. Fence along 38th Avenue Sincerely, Darin Morgan Codes Administrator cc address file Alan White, Planning and Development Director Meredith Reckert, Senior Planner Bob Gaspar, Comb. Building Inspector City of Wheat Ridge 7500 West 29th Avenue . Wheat Ridge Colorado 80215 . (303) 235-2853 . Fae: (303) 235-2857 March 10, 1997 Triton Development 835 Delaware St. Denver Colo. 80204 Greg : , On March 10, 1998, I was requested to review a proposed entry gate modification. Upon review with Wheat Ridge Fire it was concluded that this gate modification is not acceptable. Our files show the following options will be considered as acceptable: 1. The gates to open with the application of a lateral force not to exceed fifteen pounds. 2. The gates to be continually attended with the availability of emergency power on the site. 3. The removal of the gates. Sinc rely, ohn Eckert Chief Building Official cc Bill Lyons cc Dave Roberts 7 TRITON Development, L.L.C. / ~W'M February 5, 1998 City of Wheat Ridge Department of Planning and Development 7500 West 291h Avenue Wheat Ridge, CO 80033 To Whom It May Concern; This letter is to request that our Triton Development employee, April Feitis, is to have authorization to sign any and all documentation that relates to any of our projects here now and forthcoming. Sincerely, TAf~'d Developme L.L.C. ~ ~arry (Ode Project M ager BO/af cc: Bill Lyons File 835 Delaware Stree[ • Denver, CO 80204 •(303) 592-9600 . Faz: (303) 592-9337 HEPWORTH-PAWLAK GEOTECHNICAL, Inc. May 9, 1997 Cambridge Partners, LLC Attn: Barry Odean 10241 W. 38th Ave., Construction Traiter Wheat Ridge, Colorado 80033 10214 South Progrus Ln. Parker, CO 80134 Fax 303 841-7556 Phone 303 841-7119 Job No. 296 131-1 Subject: Observation of Underdrain for House at Lot 67, Cambridge Park, Wheat Ridge, Colorado. Dear Mr. Odean: At the time of our visit on May 8, 1997, the underdrain had been ins[alled. The gravel top was exposed and was covered with a tilter tabric. The top of the gravel was 86 to 90 inches below the top of the foundation wall. A sump was located in the southwest corner of the lower level and was about 45 inches deep. The invert of a drain line entered the sump about ] 14 inches below the top of the foundation wall. The drain appeared to be installed substantially in accordance with our recommendations. If you have any questions, please call. Sincerely, HEPWORTH-PAWLAK GEOTECHNICAL, Inc. ~ Richard . Hepworth, P cc. Bill Lyons 7 TRITON Development, L.L.C. Alan C. White Planning and development Director City of Wheat Ridge 75G0 'v"Jast 29th F;venue Wheat Ridge, CO 80215 Dear Alan: Per our conversation this morning, please accept this letter as our word of agreement to extend the Letter of Credit that is currently in place for the improvements of 38th Avenue. We will extend this Letter of Credit through April, 1999, which would correspond with your original request as stated in your letter of November 23, 1998. The original of this letter will be forthcoming by mail. Please accept this faxed copy in the interim. This will satisfy the balance of your conditions which will allow the Certificates of Occupancy to be issued on the last two homes. Thank you for your assistance in this matter. 835 Delawaze Street v Denver, CO 80204 .(303) 592-9600 . Fax: (303) 592-9337 The City of 7500 WEST 29TH AVENUE a WHEAT RIDGE, CO 80215-6713 (303) 234-5900 j+~ City Admin. Fax # 234-5924 Police DepL Fax # 235-2949 December l, 1998 Mr. Bill Aver P.E. Adams-Avery L~d. 11026 Maple Road FO Lafayette, Colorado 80026 Re: mbrid e Park Bike Pat @?;West 41s` Avenue & Miller Street-- nstruction'Drawirigs Dear Mr. Avery, This letter is to inform you that the bike path construction lans for the above referenced project have been reviewed and approved ~or construction. Please be aware of the following items regarding the construction of the project: 1. It will be the res onsibility of the contractor for the pro ect to repair any damaqe~o the existing public improvements on Mi~ler Court as a result of related construction traffic in the area. Also, the contractor will be responsible for maintaininq Miller Court and West 41 Avenue on a regular basis such that they are free of construction debris and tracking from construction traffic accessing the site. It will be the responsibility of the developer/owner, to provide the necessary testing for subgrade compaction, and related material tests for those concrete and as halt improvements to be constructed within public right-of-way. Tes~ing methods shall be in conformance with the 3atest industry standards. The number of tests taken shall be at intervals sufficient to confirm that the structural inteqrity of said public improvements are in conformance with the respecEive materials testinq specifications. Copiesof all test results shall be forwarded to Ehe City as soon as possible for review. 3. Prior to any construction of public imp rovements, the necessary qht-of-way construction permit(s) and res ective licensing will neeY3 to be submitted for processing by the ~ity. I yo1 j have an questions, please contact me at 303-235-2868. S' cerely, I i Gr g ECryudson, M.P.A. . . Development Review Engineer cc: Bob Goebel, Public Works Director Alan White Planning & Development Director Dave Kotec~i, Sr. ProjectEngineer Steve Nguyen, Traffic Engineer Darin Morgan, Codes Administrator John McGuire City Surveyor Meredith Rec~ert, Senior Planner File r, PECVCLED PAPER 646Z-SEZ :XV-A 1N3W1FJtld30 30I10d • bZ69-4£Z :Xb'=1NOIlVkl1SINIWdtl • 0069-bEZ (EOE) iajie{j, uoiIonusuoD any ~8£ 'A'~ ibZOiD"I"I `szacq.izd aSpuquieD`sa4izg 2aiD iattei,I, uouonusuo `aey q38£'!x1 IbZOt ~'D'T'I `siacqxsd agpuqcusD`ueapp 6usg zaaucSug macnaa , juarudojanaQ `uospnux 20.uJ ioToanQ juauzdotanaQ pue Ouiuueid `altcM usiy 919 00 .coPuscutuzpy apoO I EBzoy~ uueQ GN ,1lalaouts '£S8Z -S£Z 3E acu losluoo ol 304 i3a3 aseald sanssi as3qjBuTp.ze3ai suiaouoo io suoilsanb fus aneq no,i3I -pansst aq tiim XouEdnoop 3o sa;eogcuaD aal iszi aql a.co;aq panoiddE pus pa;atdcuoo aq ol pannbai ac{ Ijcm Itz.u axiq acj uzuj iaq;o sansst Sucpue;s;no Sututeuzaz ile `alou aseald •tis.u axiq aql3o uoTiajdwoo io3 moiosa ue zapcsuoo plnom ,'~cO aqi passaappz aiz sansst 8utpuelslno .zaq;o iiz uaqA,, palajdwoD aq ;ouueo 10a1oid aql3o uopzod siqj;I •pansst aq jtcm ,fouzdnoop 3o sa;eoygzaD uaj;sei acl aio33q jeeoidde pue mau.az s,35pr.d ;zac{M30 latD am zo3 pauiuzqns aq susid uouonRSUOO annbai jiu+ loa Coad acg 3o pua cgzou aql ia jieR aXcq acU •Xousdnoop 3o sapeogzlzaD paimbai atp utz;qo pus sanssi SutpuE4sjno aql a;aidcuoo ol amlis3 aqi jCq paloa33z aq fscu qocqm sapxadoid asaql $utuiaouoo sluacuaa.12e iaqJo .co s2uisolo alelsa Taai Fue io3 ajqisuodsai aq lou Iltm ,tltD ay,L •!t$u!pioooe sluauzaaiSE 2iuisoio .mo.~ jsn[pe pue sjuaucaambai asaq4;o azeme aie,iacg os sajzs pue s$ucsoio 8utpie2aa tauuosiad Ije fqqou aszald •passa.ippz aq ol Butpaau sattssi Bucpueis;no aql sa;eis ;eqi jauai 866T `b lsany aq; 30 ldoo e paqoelle pcn3 aseaja •a3pcg ;eaqjA 30 S4t3 aql ,iq paldaooe pue pajatdmoo uaaq antq sanssc ajts gucpuszslno 41D acg `~Z7 `JuacudotanaQ uoIcxZ oz jjz Iclun Xousdnoop 3o sa4ao3luaD uai iszl aql anssc lou Rw f luas siaual 8661 `b jsn8nV pue i aunp aT cn paouaza;ai se papjdcuoo sanssc aits 8utucemaz ije aql 2ucua3 uc zozoE3 uotlzzapcsuoo e2ucuzooaq.zacpzam pue asoio ptdei z ol Suauoo uoseas uopon.Rsuoo aql ol anQ -,iouednoop 3o sanoc3tyiaD anEq lou op lzql uocionRsuoo zapun s$ucliarr.p 0z Fialzcuixoidde aae azacU spiooai mo ol Sucpioooy `8aujieaQ saluagipaj . p!-tqLuu :a2I bOZ08 OD `januaQ 190z1s aaemElaQ S£8 s391Eg EaaD 0/0 .0•7•Z `juauzdojanaQ uojuZ 8661 `bi lsn2ny a~pj2l, ~EaTj~ 9 LZ08 OQVaOlO0'3Jala lb'3HM • 3f1N3At/ H16Z 1S3M OOSL •.l {o /fl!o 841 w 0 Q z 0 H E a 0 E W ~ w W a ~ ~ 3 O CY. U rn w w cn r~ s+ w o 4) a v o o .c Q G Q' ~ -P -P a ~ A P 4 m ~ ~ ro ~ ° ai o 'i Sa 'O N m A C N ro N ,C CO m a E ~ a ~ ~ o i a ai ~ ~ 0) C) ti a~ ca a) -P o zs v > w ~ a Oo ~ m 0 0 a ~ ~ ° ~ a, -ri 04 w (D 3 U ~ -o ro ' 3 0) ~ o ro . . m 04 ~ + ~ N 0 N CL U -P N N -.i A N m -P ~ rts ~ r ° Y U ri i ~ w N ' ~ .C ul ~4 A C N ~ ~ ri ~ 3 0 ~ rn ro a ~ G ~ LL ~4 ~ O o 0 r-1 0 '0 S4 U1 U o p C b) ~ ctl N N U v 4-) W i N Q i p ro ~ w ~ p 0 p C ~ A ~ ,i <n o (a 10 (1) -P ~ A G ~ N .-i ri ri ~ . 0, ro + ~ m a a ~ o Q ~ ~ i 2s i 3 E v~i > U Q C -~i Q N~ W N -rl i p X ~ s ° ~ S+ ~ -o N (1) -N O v1 > . ro O ~ m Q Ll ~ N O i ~ W ~ ~ E N C o a v m 0 ~ ~ ~ . , o = ro ro 0 3 0 0 o m E o i-- N .c w ~ c m w o rn 00 C ~ 0 c t6 ~ ~ G ^ ~ ri f1 {-I S-I -o o M o ~ a~ t o o 0 c -rl o U ro Ul y U N Ll w co ro ri 00 W c o M ro n- -.i -P a~ m ~ A ~ ~ m a a •.i e 3 O O ~ P A 7 > 0 i1 C N N ' ro . ~ N 0 ~ N 1 CL Y a~ a ~ ctl 3 tG O ~ N ~ O ~O U A ~ ~ ~ G (1) R O ~ ~ m c tl P • 3 ~ o 0 ~ a ~ ° (1) m (1) ~ ~i o o N ~ a E ro ~ g 'O O 3 O ~ N O O m -N Sa ctl ::3 -.i Ul x-i t o o U .C w w O (1) o m U ro w o tz r- ~a ~ c 3 •-i 7 (1) o w zs o ~ . v m m s a tr x a) -P d ~ w z7 +J E E (1) ~ (1) a) N ~ in ro W o ° W tT v O C G O -P Sa b) . -P C o a) o o N ro m ~j a) ro v -.A . ~ • ~ ~ . -a -0 91 w ~ ro D, •r+ w a4 u W 3 E ° ~ ° ~ L 1-1 a ~ 0 ro o o ~ 3 ~ 27 .F, - a) ~ ci (n ° ~ p -F-) ~ U O O ~i C O p U N N o •r+ a, o ro 44 P :j r-i ro o 10 '(2) M p ~n O N U N U SL O -rl N N N >i Q O ,C U1 C ~ ~ .C .C Ul E ro O ,C C ro ro E E W •rl tR W -P H 3 , E ~ N N C 3 O 11 U N a 0 ~ a~ > N Ca ~ F+ O +J 0 ro N G 0 U W O N -P (a 'C7 m ~ -P ro x ~ rc3 C N 't7 N N a x N N ro ~ N ~ ~ 0 w u 0 ca z 0 H E a 0 z W ~ w w a ~ ~ 3 0 a U ta W I N i n w E a w U U a ~311 ~ ~ ~ ~ ~ rn ro a 4~ ro a) ~ w Q ~ 4~ -P C a) e a 0 H N > a) Q ctS rn G ~ C ro ~ a w O N O -P U N 4a n W G O .H 4~ a O ~ x ~ ro W z z ~ V ~ v 0 w ~ a ~ h N N ~ 3 O ~ N N ~ 0 ~ ~ D ~ Q ~ c, 0 ~ U ro ~ ~ C O U U ' N ~ ~ N ro ~ -P Q a ro ~ -P c o a) G E a) T3 a) o >1 rn i -li ro ~ ~ a .c e -P ro p ro c, a ~ 0 a) w 0 a) Q 0) p U '0 bl ~ ro m a N m 7 t0 1". -P U 4 ~:l :i: w p o -P w m o m U ~ >1 G o -P (a w -H -P U a >1 a) U N U C .C U ro -P (a 0' a w q ~ U CL O N 7 0 w N o ro .c ~ +J N q -PN .C ~ U -P w ko p " s, ro x a) 0 •.-i m >1 -m ~ m a) fa N U E ~ ro ~ „ n.. ADD ' ~ - ~ ---~----J ~ - `CAMBRI G - ~ un~TSEIC~H~ qPCO~ EmlCwl~ 10 ~ att 6-wGr io¢ I . ~ R S~ Sr c gF I I i I P O I 1 I . f) ~ te 1 A ~i ~ apn ~ be2 ~ \ O CZ ~ Ip] I W = I ~T1W Z i mI/ff /AY - l SF St~ ia- I z- m ~a S pm 92 107 x °r i .om 1 ~3 ~ ~70 *M i ~ w~o \ r- ~ d~.A~TM JO' ' tt ~N 001Y N ~ A Mf,EA 70.00r ~ \ \ oED~CwRD T 6] '.965 y°~ Z` ~-o o . ~ ,o [A 1 ~ 6) W05 ~ C-~, 63 z ' L) M- 39' s, c7~ ~ - >e sp ar2 ~f-- ~ 6h s ~'o "r 3 ss i :K b36 61 y~5 w~ I i iO$ r,~, ~ 0'0~ I ~ ~ { f7lACT E ~ -DRAlIVAG6 = i E.tSEXENT . -DO7' ~ ~ 39 \ IE. EASEIICX~ 1p'p~ \ kEQPnP~ MC f005~Y Q- . - MJ- -M I~1 ~ Vf - I ! p{e ~ 5 b]+ 1 I ~ i r a. SHEET . . . ' CAMBP' cma~*~aw-ca p1/ooR ~c rOeu. ~see ( is eea. 1 i~ Y° ~z O li "YT t ~ --L_-- . uIIl.lt COtJF ~ ~s . scrc r _ w rccr R ' o yp ~a ~sa . g .awr a av.wc ~ ~ a m .n a ma+w~ . ~smn. ur a nr u,/. z~ v ~a +on A.wcoxs _ 0011' M - - - - - - - r - - - ~ - - - - C~ 3, esn 3921 I ~ :3 , s• zs \ M', „ 1 ~ ~ 1 / li '1' I ~ LV 22 M65 I S~ 38,5 "5P ~ BLOCK 1 i, .YILLd'R 57R6ET xss ~i ! xe ~ E;3WT xoz ~ ,;;a \ feas C0 l` ~ ~ GV CCwCM t01 ~ / ' . , 11SP.~ m v+ ~ Z ~ > G m n i f J~ ` ~a~o y wt 1~ Xw- , 1 V{~~ e I _(~SCKMTM~~( yps~ / T 5 0159'S9" w BLOCK 2 I i ♦ ' S ~ ~ j s ~S 8 5P r ; ~t1D1 f111Q1 ~ . nuG'r 0 H~ r DRAWACd ~~°Y ~ 6A$E:1(6tV}~ w~n011 N0. fOC~TG1 I . ,I YII.ItR st'RLLT ~l ROW 1965 ~ M 311, ~c wnn Mr~+c[ mrt~ (A4~SN~ Sc ~~J 39A 39y5 ~ 33 , , ~ ,Go c ~a~~rv I 1 ~ y~ )915 ]9JS ' 1 I I I ~ I9J0 ]9 3910 Ga . ~ ~ ~ ~ ` / ' 1950 ~F y ~ ~ b95 ~ 390J \ 1 ]6)y V . \ \ (~A F Ai { e ~ ~ b ( ] ~ ~ Y 1 I 1 5~uTwill~ ~ ~ ' I I 593I I i ~ 9npp/~/` I ~ 'j~g~ ) Y ` ~ \ ~ ` ~ l9a~y $ OOOE 23 ffAL7, S ~ D/GlIYAC! J 6AS~YdiVT ~ "a~~ «o .aosae7 E0 ~ ~~z I, 01 , I 8 , 1 . : i ~ $ . (tNA GULCfl = e ~ r F t mc xr t . ~4 Y ` ~ P - L E! ~ tl~ x cna sc a a.s~c c see t1}~ u 1 ' I I 42 1956~ a - -~b- - ' E r.smtvuir~+.t.iR. s~ ~ ~ 0 A Y S - A V = ~ ~ , 1 SUBDfVISION BOND 8cnd No. 1321911 KNOW ALL MEN BY THESE PRESENTS, that we CAMBRZDGE BUILDERS, L.L.C. 835 Delaware Street - Denver, CO 80204 as Principal, and AMWEST SURETY INSURANCE COMYAaNY authorized to do business in the Stote of Colorado os Surety, ore heio ond firmly bound unto _ CITY OF WIIEAT RIDGE. COLORADO as Obligee, in the penal sum of THIRTY THOUSAND. AND N01100-------------------------------- 30,000.00---------- ) DOLLARS, lawful money of the United States of America, for the payment of which well and truly to be made, we bind ourselves, our heirs, executors, administrators, successcrs and assigns, jointly ana severally, firmly 6y these presents. WHEREAS, CAMBRIDGE BUILDERS, L.L.C. hos agreed to consiruct in CambridQe Park Patio Homes -Wheat RidQe Colorado Phases I throueh IV vision, in City of Wheat Ridge, Colorado , ihe fo{lowing improvements: Walking Path and Pedestrian Bridge NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall con- siruct, ar have constructed, the improvements herein described and shall save the Obligee harmless from any loss, cost or damage by reason of its failure to complete said work, ihen ihis obligafion shall be null and void; other- wise to remain ia full force and effect. . Signed, sealed and dated this 15th _day oi e y: 19 97 . n.,or„ey.in-Fo<T EXPiRAT10N DATE POWERNUMBER READ CAREFULLY This documen[ is prinled on white paper coniaining the artificial watermarked logo (A ) o(Amwesl Surety Insurance Company (the "Company") on the Gont and brown security paper on [he back. Only unaltered originals o(the POA are valid. This POA may ml be used in conjunction with any other POA. No representations or wartanties regarding this POA may bc made by any persort This POA is govemed by the laws of the Sta[e ofCalifomia and is only valid until the expira[ion date. The Company shall not be liable on any limiled POA which is fraudulently produced, forged or o[herwise disVibuleA wi[hout the permission o(the Company. Any party concemed about the validity o(this POA oran accompanying Company bond should call ymr local Amwes[ branch office at (303) 368-7421 wnstiNte and appoint WILLIAM M. O'CONNELL,.TR. SHELLEY CZAJKOWSKI SUE WOOD DEBBIEPOPPE SARAN F[NN TERESA KRCHNAVY AS EMPLOYEES OF IACKTON W MPANIES OF CO., INC. its we and law(ul Attomey-io-fac[, with limited power and authoriry for and on behalfof the Company a sur to xecure, eh aflix the seal o(the company theretoi(asealisrequiredoobonds,undenakings,recognizznces,reinsurance agreemen[foraMillerA~c ot rper(o n bo or other written obligations in the namre thereof as follow: Bid Bonds up ta $"1,000,000.00 Contrac[ (Pedormance & Payment), Cour[, Subdivicion S'*3,000,000.00 r 7► Ucense & Permit Bonds up to S'"• `25,000.00 Miscelleneous Bonda up W $•""25,000.00 Smell Businws Admlidstretlon Gueranteed Bonds up to S•'1,000,000.00 ~ and to bind the company thereby. This appoinUnent is made under and by au~e By-La e mich are now in PoII force and effect. I, the undersigned secretary o(Amwes[ Surety Insurence Company, a Ne corporation H BY~TIFY [hat this Power oCAttomey remains in PoII fome and eiTect and haz not been revoked and furthermore, ihat the re 'ons f the Board~ o fo h on lhis Power of Attomey, and that ihe releven[ pmvisions ofthe By-Laws o(the Company, are now in full force an G Y f ~ sona No- 1321911 Signed & sealed Ihi 15 o Au us t 97 -i'~AC7. r_ Karen G. Coheq Secretary ♦ ♦ • ♦ # ♦ ♦ .+Y ♦ MF .U ONS T O DIRECf'ORS # #E ii +F #E 1F i1 +M• # +Y This POA is signed and sealed by facsimile under nd by author y o t owi~ utions adopted by the [3oard ofDireclors of Amwest Surety Insurance Company ata mceting duly held on December 1975: ~ ` R850LVED, that lhe Presiden[ or zny i e c denl, in nJunc wi[t~'iq~ Secretary or any Assisiant Secretary, may appoint ariomeys-imfact or agen~s wi[h authority asdefnedorlimiteAintheins me vi encinpo~ tmentp,@aeXcase,forandonbehal(oftheCompany,toexecu[eanddeliverandaffixtheseal ofiheCompanyrobonds,under[aking, n nces, ~pobliga.y~~T,so(allkinds;andsaidoflicersmayremoveanysuchattomey-imfactoragentand revoke any POA previously grnn rson. RESOLVED FURTHER, thatan ond, unde gni ce ~'surctyship obligation shall be valid and bind upon Ihe Company: (i) when signed by the President o any Vi resi ~and and sealeA (if a seal be required) by any Secretary or Assisfant Secretary; or (ii) when signed by the Presiden[ or any i c s dwt r ry or Assistan[ Secretary, end wuntersigncd and sealed (i(a seal be required) by a duly authorizedattomey-in-factorage o (iii)whendulyexecutedandsealeA(ifa requir4oneormorealiomeys-in-fac[oragenfspursuan[toandwi[hinthelimitsoftlteauthority evidenced by [he power ofal[omey issue ompany lo such person or persons. RHSOLVED FURTFfER, [ha[ the st na re of any authorized ofticer and [he seal ofthe Company may be a(fixed by facsimile to any POA or certification thereofaulhorizing[heezewtionanddeli ery ofanybond,undertakingrecogniunce,or othersuretyshipobliga[ionso(theCompany;andsuchsignalureandseal when so used shall have the same force and effect as though manually afiixed. IN W I7'NESS WHEREOF, Amwes[ Surety Insuance Company has caused these presents to be signed by ils proper otlicen, and i6 wrpora[e seal to be hereunto affixed this I4[h day o(necember, 1995. O~ ~r ~C~/~,1 C\76~z ~ ~ C~;`_ ~ - John E. Savage, P den[ ~ Karen G. Coheq SecreWry State ofCalifomia County ofl,os Angeles On December 14, 1995 before me, Peggy B. LoRon Notary Public, personally appeareA John E. Savage and Karen G. Coheq personally known to me (or proveA lo me on the buis of satisfactory evidence) ro be the person(s) whose name(s) is/are subscribed to [he within instrument and acknowledgeA to me al I ihat helshe/Iheyexew[edthesameinhis/hedtheiraWhorizedcapacity(ies),andiha[byhis/hedtheirsignaNre(s) nt in ru en he er n o he nC u on eh of which the person(s) ac[ed., ezecu[ed [he inswmen[. %NS'l,"'".., WITNESS handandofticialseal. ~VO.(/~fTN ,..••,~y .............../q-9~~•''~ : t~,:~p,POq....~."'., C) = Signalure ' (Seal) Lo1AngsiMCOIIMY .1997 J;'= ~`;.((15 e y .Lotton,NOtary Pu ' WyCIXntfl.ExpIfNAV06 DEC.14, 'gRAY _ .j. :J. , t!1/Li i. an ar nert ~ot ~ ur ~ W. ~x ~ 1~. t.s 8 1/4 CO! 2~ CAMBRI G L~_`-__ .1 U~TSELExT 5/~ Id ~~lCY 0lAX1kD A I . . . . , YRILR COIIRT M OT' W-wEAi ImS ( 1 225.20' N 001I411' • . . . . . F- 3 15- S e IS ~ . . . ~ I ry C . 1 9Y 100. ~101 ~ 102 . . p i ~ 9) 1 9! s 1()21 waI rtc _ waE r . x. 0 5° BLOCK 2 i ~s ~r(r ~••O ~ ,m ~ w ~ i alt~Tlo . wn .os~ Z . t YILL6R IIAY g ~ . . . . s~u~r a rta+rc S g S{~ .oo S P S a ~o o I z w ~ n ~090 gP 5 ~ ~l~Tl~ .a~r o Ra~wc a 5 ~O 9Z ~a~ i~ i.m m ° weo t06 ~as ~ DRAQ1'ACd oa~r°~cc ~^s~ !T~~ •o9zo 1 w+~ .o~o n' ro m~n v m~.fw-.. ~ I Esmn. ur o. s~ V. ra xo.o n.~voxs _ r 6'AS~IdAT iccv+na1 ta. raoaao,l ".r :c V. y~: e ew a se-n> rtutn srRCer . ~ ~ ~V Oo'11' • 569.42' I SO' R0~ ~ 63 ~/n1TM _Q• n ~x OO~t' 11 . ~fAYYEXT~ EA i ZO.OO' . . I r \ T - - - 15C C L 5965 3' .9 AIE . . ~ 24 39t3 39 2, . ♦ c ~ a s6 I] }e~5 ~ ' ~i ~ I ~ ♦ I 3 y GJ~ \ ~ Sl .TM[ ar .wc~r mds ~ ~ MO ♦ ~0 / 3E 2o J2, rt. C(~ / ei D• ~ ~j , ~'.`.-1~~ . _w Oo~'~ • qfyY J C" f 3815 ` Sr ~ NCS I ~ 3911 i. P .1931 ~ 3955 J' ises 22 p SP p 'f'pJcV ~ , m~ .,11BLOCK 1 „ d ` E: A(/LldR S7RSET xss ~i ae 5915 1 1 11 19.5 v 67 a 33 C 3'°5 ^ .aes 'w tt Cr~P C~~~ 0U1~ ry . O . EI.YMCNi W2 31 EA y~p 14 W45 ~ wa s~u~i~rn n o _ . . ` ` 10J5 • CnYMEVI . n ,I p~ U a . Ssos ♦ ~ . _ es . ~ ~ PC~ 6 c> I n1i c ~1KISFy- ° ' co ~Pi -J°scMucHA 39" ~J cs z ; ~ -j i coww 1 O G~ ssao .n2:. L Lo7 1 ~ SP »m l1GCT C l. ~ vso 3ss0 ,9 ~ ~1 9, A ' ~ ad h i/ w C)~,~ s°sO 5 O ~ O I p . \ / / b95 ~ J905 ~ 39.5 ~ }955 4C663 " x. V) 14 ~q ee7. 1915n ~ 3g / 5965 I \3°s ~ .no• , m u ~ Iq ; 'BLi)CK Uu+n . "oxs , 61 . , ` E15F N , ` ^ 407- ' ~4a • f , ` S Lff CBMILK _ ~l w f y1~ . . . b'S)a~i K~ EAYYENI h•^~ba 0' u}~~iv ~ 6 ~ . .~E URMIT' ' µ~r • byy . ~ayl ~~45E4ENt 1 yq59 ; ~ ~ ~ ~ss w~ 3e5R, ~I~, °sPuIFI~'i "I t j ~ - ~ A - ~ . - I - - 5 0139'S9' w ~ m ! TIlACT C . 80-04' q ~ ~2 i I I U i:s~. ~PRA/~AC6 6.fSEXENT 3vz ssss ~ : i 39°9" „ I ema e.~ IENA CULCfl ~ ~ ~s a p-~ a.v i m ~ n ~ a 1 n ~1 o . ^ ~ ~ ~ ~ i ~~2 ; ~ w~s I / ~°yp . yso0~ u~7* - I - - - ♦ J w[cE9na i Mc raos7se kl Y v vEAY~~ ~ SfYEII _ _ _ _ _ _ . . s aaQIY [ 5 0007'23' E y L fMG/1MACl ~~v : SAS6V6AT 6i c Tro [d~ E / roo6aai . sc, s/e' xce.e w- Lwc ' I . . Ltl COL ~C 2' : rn~u R~snc c.c ~.s-e.aee A 0 A Y5 - A~~ rro..~. SHEET CAMBP' . . . cm or m~r ~ct cnr . ' N4fT"vt A ~ ~ a . L ~ $ w N~ ~y V ~ -00 $ y u 1 N N N ~ M Y C y N y I &k. a k, M J+ m u ~ ~~fT ~ r V r. e • m. 4 Y~ 0 r P ~ 1 r" . Yrv u'ar Y y.' m. Y. a . . . . u w ~ O~ . ~ y o=• v u O ~ w . . ~ s ~ ~((p, . V uy ~ O y ~ Y Q~t V ~ N V V ~ ~ M M • Y ar } i ra~ .V ~ 4 aV O S °w ~i~ S µV VA =1 ~ 1 m S >ur¢i . . aW O% T~ g ~ . % • a~ u'~ m~ $ ' + i. . odt J r • -4 ` V g ~ O.:~ N g • F. .._u ~ ~ ~ ~ ~ ' = O*~~ fl - a T a "Y a ° ° „O W~ y . "'L . a a . 8-4 ' a o m ~-C. ~ N - ^ ~ • . ^ . ~i- '°„.a : v✓a:; :e~ 'o_~` - • « u« 00l ~ o~. e O a ~ u~ $ o. 6.,°R = ~r °w ~Q Kca~qMro. OwGrk Lal ~Y i~l n i m The Cify of 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215-6713 (303) 234-5900 ~ h e at Ciry Admia Fax # 234-5924 Police Dept. Fax # 235-2949 . idge \ July 24, 1997 Mr. William Lyons CE=FIED MU1 # P963 361 192 Triton Development, L.L.C. 835 Delaware Street Denver, Colorado 80204 Re: Cambridge Park Subdivision, 10241 West 38th Avenue - Notice of Rejection for Future Phase 2 Temporary Certificate of Occupancy & Certificate of Occupancy Applications Dear Mr. Lyons, This letter is to inform you that as of this date the following issues, which Triton Development has been aware of during the past several months, have not been addressed to the satisfaction of the Public Works Department: 1_ The letter of certification, for the various drainage improvements, has not been received. As you are aware, Triton Development assured the City that this letter would be submitted, and agreed that temporary certificates or certificates of occupancy could be withheld for any units within phase 2 of this project, if this letter was submitted to the City for approval. As a reminder and for your information, I am including a copy of the map that this department has been, and will continue to use, for determining the phasing boundary. Despite,this agreement, it has come to the attention of this department that three certificates of occupancy have been issued for lots 66, 68, and 69. These certificates are all within the phase 2 area of this project, and were never signed off as approved by the Public Works Department. 2. There is still a low area of asphalt along the West 38th Avenue frontage and east of the present construction entrance that has not been properly repaired by Triton Development. Several verbal requests to the site's project manager, Mr. Barry Odean, have been made over the last several months to repair this problem. This area needs to have the existing asphalt removed because of the excessive time that water has been ponding. An asphalt patch (minimum 9-inches in depth) needs to be placed in accordance with City standards. Please notify the City at least 24 hours in advance prior to completing this work to set up an inspection and confirm licensing requirements for the contractor. Qp REGVCLED PAPEF e :.dYe~e so,~e ~omm~~:~.• 38~h 6 Mil(r.Sirrer WhewRidge 1zl ~ 0 ~I qq/,~r P/i P6ase 1Ta-Agal Pbase 2 = Thiz exhibif is to be used for reference only. All locafions are approximote. Mr. Bill Lyons Triton Development Page 2 ` 3. A drainage problem has been created along the entire Miller Court frontage between the back of the new sidewalk and the new fence. Water from the operation of the irrigation system, drains to the low area described. This area need to be regraded as needed to properly convey flows from the Cambridge Park site that are adversely impacting this area. Please be aware that effective immediately, the City of Wheat Ridge will not accept any temporary certificate, or certificate of occupancy applications in Phase 2 of this development until such time as Triton Development has completed the above items to the satisfaction of the City. If you have any guestions, please contact me at 235-2868. Sincerely, ~ Bob q6e-be1, P.E. PubZic W6rks Director Review Engineer GK cc: Robert Middaugh, City Manager Jack Hurst, Interim Planning & Development Director Dave Kotecki, Sr. Project Engineer Meredith Reckert, Senior Planner John Eckert, Chief Building Inspector File MEMORANDUM TO: John Eckert, Chief Suilding Inspector FROM: Greg Knudson, Development Review Engineer DATE: June 5, 1997 ' SUBJ: Cambridge Park Development - Phase 2 Certificate of Occupancies This memorandum is to inform you that as of this date the required letter of certification, confirming the satisfactory construction of the project's drainage improvements, has not been received by the Public Works Department. It is critical that this letter be submitted while Triton Development is still mobilized at the Cambridge Park site. Therefore, please be aware that as of this date the Public Works Department will not approve any requests for a temporary certificate of occupancy, or certificate of occupancy for units within Phase 2 of the Cambridge Park Development until such time as the requested drainage certification letter has been received and approved. cc: Bob Goebel, Public Works Director Glen Gidley, Planning & Development Director Dave Kotecki, Sr. Project Engineer Meredith Reckert, Sr. Planner File O z ~ ~ ~ a N 2 w a °z oo WFn J W~U c0 w ~-Oa z~~ ~w~- ~ °-w O ~ U ? ~ ~ O Z O Zo> W J Mm U ~ aa W a ~ X 0 W m Q Z a W Q ~ t N ~ X N W W a O t~ A N h Q N 0 W ~ ¢ U 0 ~ 0 ir Q F 0 0 ~ 0 K ~ w 0 O U a N ~ N W ¢ ~ ~ r W 2 J f R O ~ ¢ LL N U z ~ n L 1 ~ w ~ u ~ R N R a 0 0 z ~ N ~ 0 z LL W N V b n M ~ 2 0 W 2 m ~ U N ~ ¢a 00 U N Y W Q N F W R N ~ r a I J~ O N 5 0 ; U = Z N _ F ~ ~l s~ 9 ~ Q J m a LX ~ mf O W ~ a W 2 J ja J Y ~ >N Q a F- o v gZ Y N O~. LLI Q f/i U p LL: ~w ~ a ~Z Uwi N N W V jN y~ Oy N W ~ ZLL Q a Z W ~ rb- za 5 00 ~ ~O cr ¢a 002 j O aN Q ~Q Z~Q 0 r F Mz V w~ N m dp zw ~ax Q $ Q y1 W ~ J f J O J fwa mr ¢ Gj J K LLa 3~ O a Fa- U U 41 2 J a ~ 00 N N = r a N ~ W w r ~ g N ~ R » > ~ ~ a a m m m m y w J a a ~ c~ 3 y Y z Z ~ ~ I O F > tJ 0 N Q ~ K K f' Q ~p V 2 W a ~ a W f 2 O W tJ o o U ~ p Q ~ 3 f u ¢ LL ~ r a ~ g O W J K LL fp W N ~ = O K ~ Q W ~ S Q K' Z S ~ Q ¢ M ~ Z ~ N ~ a ~ Z O Z N m W m V Q W N W . J N J p W Q N R W Z a J 1- W s ~ m ~ w = 3 = ~ x Q u m ~ ¢ W a ~ N LL y y 3: W W Q g a a a °x z a a ~ m g ~ w = o a 3 3 m w m c~ 3 a 5 ~ ~ o o r H J a w U f' w ~n N rc a J ~ W W a m a 2 2 y N g Z U w Y a J N w a ai ~ o 0 m 3 a V O Z ¢ w f I w W ' Q ~ p ~ W 2 ~ Z } V > K N V 'm U Z K O O W 2 O p f" R W O U W Q ~ > W y y J V ~ ~ N t 'J Z Z ~ r x U' N ~ K W J f 3 Q = Q 3 ~ ~ ? ¢ Z Q p 0 a z w Z U J Z d ~ ILL 3 N ~ Q ~ N ~ ~ R g G F ~ W a NU N w Xj0 W y Q U 2 m N h m ¢ Z Q ~ O > J=O a p N U 2 I P v 3 ~ w w V o~ I W ww i` x i'' 8 8 m ° ' g ~ Q 0 Ir w 0 W aa - L~ a W N O Ln S o a n f- 0 U C) O T N ° - a « V p. ~ P~ J f n o°; o~ a°u E p` m T 0 V o_ Aa« E ~om a°; c ~ a ~ ~ e c Y Ez F O U p O 0 O C~ M~ C L ~ O m~ m o 3> c 0 0 - « ~ 00 m c° a o 0 0« ; b a o N j« ~ 0. « C O L m V L> „ - Y `w G ~ ~ O r O f C.~- ~ c Y N C T. C O v m 3 ~ `p o . c° ~ ~ N o o ° c ~ o m a ~ u u U'o E > wan~ ww ew ww. FINAL DEVELOPMENT 3lI{ Cp ~ 21 10' MWt 6 Mt PLAN -or tse ~ rr►~s mt~RP (/O' ~IID/~. ~c.wc rvia amrwnn er x.T . . CAMBRIDGE PARK SITE PLAN ~uc r . w rt[t . . I 0 50 t00 150 . ; , ~ a i i I I i ~ I ~ wtArrr 1 I . fUl(.E'~E111E1E11 ~ L J 1QW arrive' w . , 1 - ^ \ ~ ♦ i ~ I 1 i 1- I ~ 1 / I u ~ A.W ~ r J2 I Y Q~ ~ ~zoo n- . 1 7/ \ I 6.00 ~NLY~ II ~ i f ~ 21 1~ I ( I ~ ` ` ~ I CUYON uaA I I 1 ~1 J] N ~ I I 3 I ~ ~ I ]0.00 42 p I Mw~~ ~ II I i \~SI o ~ _ s ,9 1 Na I I , x <I I yi I !~i / s o~ 5 i e . X~~ x.oo sfie ~ e ~ I / 1J 1 m ~I °utiE~01 R1KL 12 ~y ]1 IENA GUL + I ~Il~ 5 0159' ' ~coennrx .0~' 1 ~wO t¢z5 u4vC / ~0 ' It \ - Ns' - ` - - I ~oao gre~ac c.sm~rurv.~e.nu, zc-i c;a.~ ~ L` ~A1C. 9R KII V OS 1 93 ~ n « . _ w.ao O _ _ ~ ~om 3" ~os i'`~n p S I x ~ . a. Fr.s~[xr~~ N / I im - ZGS.C0, 97 9E 101 1 101 na.6,t 1 m ~ M I ~ ~ ` \ \ \ dE ~ )0 25.00 - +I \ ~ / 91 ~ / 4 ~ I ~e-~FaOt 1@ESIRMI w r n A x EusTINc M 4le ML IqIT OF NAY ~ w avrnn uxE I ~ Y~%IMUM BUItDINC EMVELOPE 106 I NODELS) V lOT Na ~ \ Et ~ 6l I p Pq~AiF 5 T - - ~ 1 U Pt E ~ ~ )S V P31.00 )4 I M ♦ 92 raoT ~ ~ ` _ _ 00 lIEpQ go 10.00 ► YIEAIX ~ e. I w1owK 'nf ~ ~ / \ W sz N1 PATI S. i r ~i ` . _ : a~ z se e~ - R31.00 -5 A ~ x.oo ai N 1] m K ~ I f _ ~ I 41 ~ IS b S) \ ` ♦ M ~ b ~ i/ ~ ~ 59 j\ ...i 5 BU0.DNG J \ 4' CURB ON orsiWwr.r a- wne +nTM ATfACNED 4 SIDFWALK TYPICAL LOT NO $ULE ~1 ~ ~ CEP11G1 MUfWSTS~) . . YIR►ilm " ccxrcitn ~cr~¢ ~ ~ . or 6 ' w u' CAHBRIDGE PARL e y~P CASE No. WZ-94-3 . ~ o A r s- A r' CASS No. 112-94-t4 ' . CASS No. 112-95-5 CASE No. 11V-95-3 . . . . . ~ I ►i~n i O Iis S~ Thu uhibff u b be vud for rs4ronw only. All localiom are aPPrmdmata ' DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE Date : 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Property Owner : Te+ °'`J ~P PropertyAddress: !Oo"T41 113 3 e-a 41k Phone: Contractor License No. : Company : A90 54044 6('ej Phone : OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this application, and that I assume full responsibility for compliance with the Wheat Ridge Building Code (U.B_C.) and all other applicable WheatPYge ordinances, for work under this permit. (OWNER)(CONTRACTOR) SIGNED DATE. Description : Z'C&y-01' / W 'VAJ P4J`~ Wi¢ BUILDING DEPARTMENT USE ONLY Z SIC Sq. Ft. oning~CommentP Approval : Zoning : Bw~dmg-;Gommenfs~ Approval : P ~iblic1NiorRs;Gdm-ments"~ Approval: Occupancy : Walls : Roof : Stories : Residential Units : Electrical License No : Plumbing License No : Mechanical license No : Company: Company: Company: Expiration Date : AppPOVaI : ~ ~Flans R`e,q Construction Value : Permit Fee : Plan Review Fee : Use Tax : Total : io C,t6e4 4/9e Ae~. Expiration Date : Approval: M, ~Plans Reg Expiration Date : Approval: EM -Plans Re'qwred~ (1) This permit was issuetl in accordance with the provisions sel forth in yopur appliwtion and is suhject to the laws of the State of Colorado antl to the Zoning Regulations antl Building Cotle of Wneat Ridge, Colorado or any other applicable ordinances of the City. (2) This permit shall expire if (A) the work authonzed is not wmmencetl wM1hin siuty (60) days from issue date or (B) the 6uilding authonzed is wspended or a6antloned tor a penod of 120 days. (3) If Ihis pertnit expires, a new pertnit may be acquired for a fee oF one-haif the amount normally required, provided no chanqes have been or will be made in the original plans antl specifcations and any suspension or abandonmenl has not exceedetl one (1) year. If changes are made or if suspension or abandonment exceetls one (1) year, full fees shall be paid tor a new permit. (4) No work of any manner shall be done that will change the naWral flow otwater causing a drainage problem. (5) Contractor shall nohfy the Building Inspector iwenty-four (24) hours in advance for all inspeMions and shall receive written approval on inspection rard 6efore proceetliing with successive phases of the job. (6) The issuance of a permit or the approval ot drawings.antl specifications shall not be construed to be a permit for, nor an approval of, any violation of the provisions of the building codes or any other ordinance, law, rule or regula6on. Chief Building Inspector For Mayor THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE Date : 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 PropertyOwner:'~~t4ianJ J?eo Property Address :/0 Z~l tJ 381~'Av F Phone : SIZ~ ~ Contractor License No. : 3T~28 Company :/l)d 31,10K755 <L/CC4'L Phone :~'p OWNER/CONTR,4CTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value : ZO~ 6<3 I hereby certify that the setback distances proposed by this pertnit application are accurate, Peff1'llt F2B : p~v ~6 and do not violate applicable ordinances, mles or regulations of the Ciry of Wheat Ridge or covenants, easements or restrictions of record: ihat all measurements shown, and allegations made are accurate: that I have read and agree to abide by all conditions printetl on this ~ i -1~ Use Tax : i application, and that i assume full responsibility for ompliance with the Wheat Ridge Building Code (U.B.C.) and all other applicable Wheat 'd ordinance , for work under this permit. ~ (OWNER)(CONTRACTOR) SIGNED - ~ DATE z ~IL Total : c ` . Description : A__ A_~.-. '7-7Z4w~ '7C.-;b~ BUILDING DEPARTMENT USE ONIY ~t EMM Approval: Zoning : B~IIIpIrYa~'oTim~Sts~ Approval : Pqblic:W~iYk -Ca~1 "erits:? Approval: Occupancy : Walls : Roof : Stories : Residential Units : Electrical License No 9~~00 Plumbing License No : Mechanical License No : Company :jJo Skaqfs Company : Company : Expiration Date: 2/lz g~~- Approval : Expiration Date : Approval : ]M Pl"s:Requiretl Expiration Date : Approval : e~ !ig[Sns'R"~qui~eZl~ L,j -,Plans;RBt (i) This permR was issuetl in accordance wiM the provisions set forth in yopur application antl is su01ect to the laws of the State o( Coloratlo anE to the Zoning Regulations and Building Cotle of Wheat Ridge, Coloratlo or any oNer appliwble ordinances of the City. (2) This permit shall expire if (A) the work authonzed is not commencetl within sixry (6a) days from issue dale or (B) the builtlin9 authonzetl is suspended or abandoned for a penod of 720 days. (3) If Nis permit expires, a new permit may be acquired for a fee of one-0alf the amount nortnally required, provided no changes have been or will be made in the ori9inal plans and specifications and any suspension or abantlonment has not exceetled one (t) year. If changes are made or if suspension or abantlonment ezceeds one (1) year, full (ees shall be paid for a new permit. (4) Nb work of any manner shall be tlone ihat will change the naWral flow of water causing a tlrainage problem. (5) Contractor shall notify the Building Inspector twenry-four (24) hours in atlvance for all inspections and shall receive wririen appmval on inspection cartl before . proceediing with successive phases of the job. (6) The issuance of a permit or the approval of drawings and specifcations shall not be construetl to he a permit for, nor an approval of. any violauon ot the pmvisions of the building cotles or any other ortlinance. law, rule or regulation. Chief Building Inspector For Mayor THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION DEPARTMENT OF PLANNING AND DEVELOPMENT BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Building Permit Number : Date : Property Owner: jQitnnv -D_✓G-wv.y+..sar 11-c. Property Address : /bz-v k- 39rf /fV':' Contractor License No. : Company : OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this perznit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and allegations made are accurete; [hat I have read and agree to abide by all conditions printed on this application, and that I assume full responsibi' r compliance with the Wheat Ridge Building Code (U.B.C.) antl all other applicable W at Ri e ordina ces, for work under this~ it. (OWNER)(CONTRACTOR) SIGNED DATE Q~ Phone: y9z-96~ Phone : Construction Value : Permit Fee : Use Tax : Total : Description : !aN s;~c r~ TR~i ~c2 S~ /ft/~G/f~ v ~~°r P~'h" ~ z,c o0 Approval Zoning i' Approval: P4blic.W0 i( t-Cbtrlmerits:g Approval: Occupancy : Walls BUILDING DEPARTMENT USE ONLY Roof : Stories : Residential Units : Electrical License No : Plumbing License No : Mechanical License No : Company: Company: Company: Expiration Date : Expiration Date : Expiration Date : Approval : Approval : Approval : 7 ~Plans Reqyi'ed :'j M. , P13ns:;Required ~ ~~ffl EPTAnsHR (1) This permrt was issuetl in accordance with the provisions set forth in yopur application antl is subject to the laws of the Slale of Cotorado antl to the Zoning Regulations antl Building Code of Wheat Ridge, Coloratlo or any other applicable orAinances ot the City. (2) This pertnii shall expire R(A) the work authonzed is not Commenced within sixry (60) days from issue date or (8) the builtling authorized is suspended or abantlonetl for a periotl of 120 days. (3) If this permit ezpires, a new pertnit may be acquired !or a fee of one-half the amount normally required, providetl no changes have been or will be matle in the original plans antl specifications antl any suspension or abantlonment has not ezceedetl one (t) year. If changes are matle or if suspension or abantlonment ezceeds one (1) year, full fees shall be paitl for a new permit. (4) Nb work of any manner shall be tlone ihat will change the naWral flow of water causing a tlramage pmblem. (5) Conlractor shall notiy the Building Inspecror twenry-four (24) hours in advance for all inspecbons an0 shall receive writlen approval on inspection wrtl be(ore . pmce ing with successive phases of the job. (fi) Thyiss ance o{ a Dermit or the app val of drawings antl specifcations snall not be construetl to be a permit for, nor an appmval of, any violation of the provisions of the tiuild~odes or any olher rdinance , le or reguiation. i F i ) '`--!l l Chief Building Inspector For Mayor ~ THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION ( ) --r--, oFFieiAL ZONl NG MAP 1~HEAT RI DGE GOLORADO ,"A' °,DO?TED: xr.e 15, 1994 Lcs* Decemb¢r 22.1994 7?nRi~54i P.-~,roaiNG sN7 N.a oPre1T -235-2rh7 AREA ~EQUIRING JI _fSiV`A`"r~ 100-YEA.P rLooD PLniN ; (APPROXIMATE LOGAT;CW 7-~`e p;STz!GT aoUNnly +`.~RGEVLC" BCI;NDRY (DESiGNATES OWNERSH!°) WAT=R r=cA?J¢E ~ DENOlzS MULTI°LF 4DDRESScS «•VAL 5E 21 ~ SC-AL_ 1 _400 7500 WEST 29TH AVENUE The City of WHEAT RIDGE, CO 80215-6797 (303) 234-5900 cWheat City Admin. Fax # 2345924 Police Dept.Faz # 235-2949 'ld5 pre April 4, 1996 Mr. Bill Avery, P.E. Adams-AVery, Ltd. 1380 Lawrence Street, Suite 870 Denver, Colorado 80204 Re: Cambridge Park Subdivision, 10241 West 38th Avenue - Approval of Final Drainage Study, Erosion Control Plan and W. 38th Avenue Construction Drawings Dear Mr. Avery, This letter is to inform you that the final drainage study, erosion control and W. 38th Avenue construction drawings for the above referenced project have been reviewed and approved for construction. Please be aware of the following items regarding the construction of the project: 1. The proposed drainage facilities shall be constructed and approved by the City of Wheat Ridge prior to issuance of the any Temporary Certificate of Occupancies. 2. Erosion control for the project shall be placed in conformance with the approved drainage/erosion control plan and shall be maintained as needed during the course of construction. 3. All drainage improvements shall be constructed in conformance with the approved drainage report and plan. 4. It will be the responsibility of the contractor for the project to repair any damage to the existing public improvements on West 38th Avenue as a result of related construction traffic in the area. Also, the contractor will be responsible for maintaining West 38th Avenue on a regular basis such it is free of construction debris and tracking from construction traffic accessing the site. 5. Upon completion of the drainage improvements the engineer, Adams-Avery, Ltd. shall provide to the City of Wheat Ridge a letter of certification stating that the various improvements, as defined in the drainage report and plan, have been accurately surveyed to confirm that their construction is in accordance with these documents. The certification letter shall be written and stamped by the engineer who prepared the DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE Date : 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Property Owner : n° r` 5 Property Address : I0o-'~ Phone : q (_-c)(L~ Contractor License No. : p Company : SS'3s }'~~i<.-~ ~.re S j . Phone : ~yc,~ " °I Goo De-.~z, , c o Fso~ y OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setback distances proposed by this pertnit application are accurate, and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restnctions of record: that all measurements shown. and allegations made are accurate; that 1 have read and agree to abide by all conditions pnnted on this application, and that I assume full responsibility for complnce with the Wheat Ridge Building Code (U.B.C.) and all other applirable Wheat Ridgeer9inan. for work under this permit. i, '9=`16 Construction Value : '16OO. Permit Fee : Use Tax : Total : - Description : AR`` Approval: V\~ ~ Zoning 8 ~It~iin°g~~m~11'ts~3 \ Approval: ~ObEM~ 6"'C . ,`.:0ttts:? Approval : BUILDING DEPARTMENT USE ONLY Occupancy : Walls i ib . i Roof : Stories : Residential Units : Electrical License No : Company : Expiration Date : Approval: ~ sPlans:Req Plumbing License No : Company : Expiration Date : Approval: ~ Pl4ns'.Re1jlluired : Mechanical License No : Company : Expiration Date : Approval: r wxns;;~qgil'e?t~ (1) This permd was issuetl in accordance with the provisions set forth in yopur apphcation and is suCject to lhe laws o( the Stale of Colordtlo and to ihe Zoning Regulalions and Building Code of Wheat Riage, Coloratlo or any olher appficable ordinances of the City. (2) This permit shall expire if (A) the work authonzed is not commencetl within sixry (60) tlays from issue date or (B) the buiiding authonzetl is suspendetl or abandoned for a penotl of 120 days. (3) If ihis pertnit expires, a new permit may be acquired br a(ee of one-half the amount normaily requireQ pmviAed no changes have been or will Ee made in the original plans and speufications and any suspension or abantlonmeN has not exceedetl one (1) year. If changes are made or if suspension or abanEOnment exceetls one (1) year. full fees shall be paid for a new permit. (4) No work of any manner shall be done that will change the naWral 8ow of water causing a tlrainage problem. (5) Contractor shall notiy the Builtling Inspecror hvenry-four (24) hours in advance for all inspecuons and shail receive written approval on inspection cartl Oefore . proceetliing with successive phases of the job. (6) The issuance of a permit or the appmval of drawings and specifications shall not be constmed to be a Oermit for, nor an appmval ot any violation of the provisions of Ihe builtling codes or any other ortlinance. law, rule or regulation. Chief Building Inspector For Mayor THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION crtx or ncur wrc exisa c.w m rtwce aaz, ~s 1~1z ~oaa A ~ <aR ,EC m TJI p09Y ~IleaT MaC 11aMUq nvo raro 5~10 M~ ~.-~-----~--.-=~-----~-----1~,__ ~_-f : 81l1ER COUftT 225:2P' ~ u W'1140' w i ' bYxn M.usw~ ~ wraxal aea- \e; 0 50 ~ ~ W rA -iT - ~ ~u•1oR aT~~ ~ h: I 'gI ~ ` ~ . (~u ; , il . ~ k SwcmvO Y . 5 a.w• f ~ . " .w.vevw.~ 8 $ ~ u Q UnITTA ~~v:rin~.~i ~ i• m e~ 4~65 ~.•.n i, ~i ~ TILICT D :utlS SmL a } za~n nin 021fNtGS ~v"ca+ o nr ana~ 'w~n~i (~It P AI Fr +o w~.. v .v.c,vr \ 6AS81lBNT ' w MC~ w n rael]Enf ' e.1e~ R ~ Mi o srn~e.r.r oA: .a~.. ~ ..I~ ~1 ~t1~A~' W 56 ~2~ T _ A~.~~„e~' Aa~~o. .-9'J1 I ♦ vs ~ ~ <.9q w.IL 6! I ~t )W ~O.~L e3.llJ fill. SJ [ \J~ 610 ean `~l o 016 m.a I 0.~) e>u R4 Y 1.A~0 II Yy 3 o.ia a~..3~ . ~ I~ ~f~ IP J!h C~~r ~r I.. ~y „I \.yo.ia aw %I~ e aei .sii:'•~Y ~y 1 a ~ ~y~A"~ ~r ~ ~~fn ~i~ # y W s a ~i 'i a2 / ~y •1 23 \ I~I ~ t,'Si9 fV1 f.S9 w.n ].500 .v.l~. 4ElS~? IL a t~ 4tle e616 eC p e,fP ~a,1. D.~f m.. o.~l ~n o.y e~n 9.aa q~ y ~ YG SIE~n g°O. lo ~0 1d Q~ 0.20 eau ➢JII Ol.li~ ~ ].q ~~r+a . 'Z il s ra~rwc 9a~v:•~ « ' 9" .^~}\g ca " '%4'~P~~~ 4 S o ~ I ( 1v}e~ I I ~ ~ '9syopv~a'C I~ ~~een.~~ eronI'.e'x o „ 1 o.u s cb ~f ~ ~ab Q ,1 pt~~ I~^C~¢al' I e .9S O , ~ 0.H asu i { ' q N ~w J 5 tiq r~r saov"e'[ I ' . al.at aa' aeze! • ~ es 4! ~ ~S I Y.: Y S f 1~~ T ~ y~ I z~ d 13e m~~ e soo,~.e c°, ~ I.'w xO7 ~ ,o, r s,. a~~ " ~ o.~Y irols I a¢i35 ~n.2 . ~ lQ~v yj ~tuiT, Y„ . w m a •.~s• CnJ p >..:r 7e2 I V /J ~ ~L~ ]6W . 10 ~p~ 1 J0 Alnn!l ~ ' ~ IE .U;. W J~ ~ C Nt ttI n~ - t_3 9] 1]I Y~~ O^ 1~F 116w ~ " y r: .r~ 615 eN'A Y v9 ¢ I.ble~6iL ~ S~, ~lee.. r.~a+ ~ A,^~ oheee ~ ~ e ~ a# ia °b~~s .t \ P~8 eo gic ot °.~dy tb e wn_•r~rc ~ I mz_v~'~Yt ~ r{ f. x 1 I I ~7~)~~ .~w.oo ~ v1e7 a I3.Sk`~1~ flJ,an , oJJ x~n ORAlN.4GE ~ito . i1L .G nrlr ettwbi~• V'i~7n ~ n.~~+ wn. '~2:E ai. • 15fMF,~f t~ e x '.k, A~ ein n~'. r. oi3 evo •P. e~~ ~te ,N` J, tef qw oi) .r n^ s.oi .aIi s! i ra+'.d7o[ n ` . ~'4'6. s o.u a~.r s.vss .e n 8° 12n aea ..vii- ~ o v Z. a 'o- t'o~.Ir o.i~ „ s Qy ` II l.,C o . pI` • ~gJ ~ I• ~ J~•L. ~ z~aoni~ C.q a,• hu m.. A.9u .v ~L' ~ S' O.V e.•~ e.vet wu. # e.eeo wai. v,~e on.. ; LD 0. l9 ~ 1 S~f'~9~'i ~y ~4 PLO_ U~~4n1 0) ~c ~QSEw.NTM ~ g~ ~0 ~ ~05) I i ~ "~Y 7..1. ~ ~P~~.UC~ ~o. SDOTA'I)'C 0~ t0~ I ~ ' ~2A9~ S000E'Ii[ mxa O ~ W~>)-w S a ` ` J 69.~9' 'o T R d C T '1 P/ t I P a Y R S 7' F E E 7' ~ a ot])'t e uwoeie'w ~ I fnce s.vit. J• I I n 7'~p1 eeSrooe'2~'L 1 Q soo 12 e '~leo5 I / 50 oa' N e~ee' oa' 63 in I ooio A,~.. c xnx: .Yi ~1 1A.Y~i ~ e,~xv Q9r ~3'eo~. cn. h1i J dxe3 , L ~ o.l9enn'1. $ r 51 YU ~ I ~ y~'~! ~ KpM1Ie ~v4 w 'enri leg~ I 36'A 9': o ebr-~ ~1 ~~1~• 5 0119'S9" . W. Flyd? av.0a' .las .o.a. nJ9 ~...it a ~ e.eu aIt nii~.r..p u iia n-.~. ~ ~ o, e e.... l aa. ' lEN(iiCUI.CH iY it 7.1E0>a.l~. .~i. l• \J'9T~~SU Ot m 9~J ~\~D. C ]dY f.!I.ij " II . P• 1i1~ 10 J 0.~6nV~~ ~y\J ~ P`TJ~J- !.9]~ea.ll. ..p.131 JLQQ?~n~ ~ 9`~~~~' ~ : ~.os~ a A~~~~• Y^ ~ • a.~e ve.. re~ \ ~.r.{~'k.f,.~'sse o.14 b t~a 5~118~~~ F~ JTteI nf O' M. W. S[ rA a( r~r . I. YmGik1N uttMOlT G1tYt1 TRACT Q ' ~ CRAlNA66 9 ~9] cn e o e• F.AS6MEA'T ~4g°u°~ •x =o' K TiFD [qP bl ~~tr E . . l J ]'~O]D ~.9!]E lowwe> eo a u w o r Z' . . . . 6G00 Z9 -J 1i 05 ~ )I S ♦ 9 1 Q gi S/E' IIEOM 4P LOUEI I ~.~~^;1~ ~I~~3 a M1H hASPC~Cw~ S-]~ _ m. 0 1~•~ n ~ ~ . \ A A A~ L 5~ _ A V E R 1', L f 0. 9C COR 8CC 9l ~0. . 2 . i .~e ~ ~ _ ~ e~~r t•ry... i rds tteor . : ~ CITY 0( wIILAT 0.1WL A0.M f,A ~ f~0C91NNl C~{CN(xl Is IS 1-fl,l,I &1 0918 M1 V . . ~N PnNf.L R1R i^•I:, 100~ ~ • . . . ~ ~ . ' ~ _ ~ C l~l i>~ Z t^, t'ct.P.kS „ i . ~ I DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE Date : 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Property Owner : Property Address: Contractor License No. : Company ~,a➢G~ ~~~P ~s- ~~G7~ ~~~2772ic., OWNER/CONTR,4CTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I hereby certify that the setbaek distances proposed by this pertnit application are accurate, and do not violate applicable ordinances, rules ar regulations of the City of Wheat Ridge or covenants, easements or restrictions of recortl: that all measurements shown. and allegations made are accurate; that I have read and e to abide by all condition nnted on this application, antl that I assume full resp sibi i r cN n ce wi teat Ridge Building Code (U.B.C.) and ali other appliwble ea e ~ nces f r under this ertnrt. (OWNER)(CONTRACTOR) SIGNED ~ ' DATE Description: ~~-~!(Y• ~~~.5'~uC~~.r/ /1~~7"~2_ Phone : Y Z 7-7U68 Phone : ~~1 -A~6 7 Construction Value : ~-~jp = Permit Fee : Use Tax : Total : BUILDING DEPARTMENT USE ONLY ~ Approval : Zoning : Approval : Approval : Occupancy : Walls : Roof : Stories : Residential Units : Electrical License No :162 3J2 Plumbing License No : Mechanical License No : Company: Company: Company: ~G~/}L ~~CC.'ty~l( (NL Expiration Date : Z rZ g-r~ 7 Expiration Date : Expiration Date : Approval : Approval : Approval : P,WRequfred.~ 7 _3 : PCans Reguired a ~:FA.:~PSA'a4!- (1) This pemmt was issuetl in accortlance with the provisions set forth in yopur applicatlon antl i5 sublect to ihe laws of the State of Coloratlo antl lo lhe Zoning Regulations and Building Cotle o! VJhea[ Ritlge, Coloretlo or any other applicable ortlinances oF the City. (Z) This AOnetl fora pe n'otl of 20 h tlay5rk authonzetl is no[ commencetl within sixry (60) days 6om issue dale or (B) lhe building aulhonzed is suspentled or a6an (3) If lhis permR expires, a new pertnit may be acquiretl for a fee of one-halFihe amount normalry requireQ pmvitletl no changes have been or will be matle in the onginal plans antl specifiptions antl any suspension or abandonment has not exceedetl one (1) year. If changes are made or it suspension or abantlonment ezceeds one (1) year, full fees shall be paitl for a new permit. (4) No work of any manner shall be tlone that will change the naNrat flow of water causing a tlramage problem. (5) Contractor shall notiry the Building Inspector Cxenry-four (24) hours in atlvance for all inspecuons antl shall receive written approval on inspection cartl before . proceediing with successive phases of the job. (6) The issuance ot a permit or the approval of tlrawings antl specifcations shali not be construed to be a permit for, nor an approval of. any violation of the provisions of Ihe 6uiltling cotles or any other ortlinance, law. rule or regulation. Chief Building Inspector For Mayor THIS PEftMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : BUILDING INSPECTION DIVISION - 235-2855 CITY OF WHEAT RIDGE Date : y oz 5-5~ 7500 WEST 29TH AVENUE WHEAT RIDGE, CO 80215 Propertyowner: eovc ✓J-e X~•~S'v•^~^~;~ ~5~~_ ~ o0 Property Address a U 1 3~ Phone :O'P~5 Contractor License No. : Company J~~ m A " i /'w., Phone :'?~2z/- 6 75-1- OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value : G/7/ fi7S. -t`o I hereby certiy that the setback distances proposed by this permit application are accurate, and do not violate applica6le ordinances, rules or regulations of the City of Wheat Ridge or P@fR11Y F@B :/n covenants, easements or restrictions of record: that all measurements shown, and allegations made are accurate; that 1 hava read and agree to abide by all conditions printed on this Use Tax : appliration, and that 1 assume full responsibiliry for compliance with the Wheat Ridge 8uilding Code (U.B.C.) and all other applicable Wheat Ridge ordinance , for work under this pertnit. (OWNER)(CONTRACTOR) SIGNED DATE Total : Description o/ i r".a --L BUILDING DEPARTMENT USE ONLY 9M Approval : Zoning : Approval : 6U1 W ~~~lniy{tY~t~~t$i . . Approval: Occupancy : Walis : Roof : Stories : Residential Units : Electricai License No : Plumbing License No : Mechanical License No : Company : Company : Company : Expiration Date : Expiration Date : Expiration Date : Approval: Approval: Approval: ~-,Pfans Regutred y°,: 1 ~ Pt3nw'Required el -A PWRR , i (1) This permit was issuetl in accortlance with the provisions set forth in yopur application and is subjecl to the laws of lhe State of Coloretlo and to Ihe Zoning Regulations antl Builtlin9 Cotle of Wheat Ridge, Coloredo or any other applicable ordinances of ihe City. (2) This permit shall expire if (H) Ihe work authonzed is no[ commencetl within sixfy (60) tlays from issue date or (B) the building authorizetl is suspendetl or abantlonetl for a periotl of 120 days. (3) I! Ihis permit ezpires, a new permit may be acquiretl for a fee of one-half the amount normally required, provided no changes have been or will be matle in the onginal plans and specificalions and any suspension or a6antlonment has not exceetletl one (1) year. iF changes are matle or if suspension or abandonment exceeds one (1) year, tull fees shall be paid for a new permit. (4) Na work of any manner shall be tlone Ihat will change the natural 0ow of waler causing a drainage problem. (5) Contractor shall notiy the Buiiding Inspeclor twenry-four (24) hours in atlvance for all inspections and sha0 receive written appmval on inspec[ion cartl before proceediing with successive phases of Ihe job. (6) The issuance of a permit or the approval of tlrawings and specifiwtions shall not be construetl to be a permit for. nor an approval of. any violation of the provisions of the building cotles or any other ortlinance, law. rule or regulatlon. Chief Building Inspector For Mayor THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR CALL: 234-5933 24 HOURS PRIOR TO INSPECTION Z . i /500 \NEST 29TH AVENUE The City of bNH[A7 HIDGE CO 80215-6797 (303) 234-5900 cWhe at City Admin. Fax n 2345924 PoGce Dept Fax # 235-2949 GRidge September 3, 1996 Mr. William Lyons Triton Development, L.L.C. CERTIFIED MAIL # P 470 649 061 835 Delaware Street Denver, Colorado 80204 Re: Cambridge Park Subdivision, 10241 West 38th Avenue - Unauthorized Construction Access Dear Mr. Lyons, , This letter is to inform you of the City's position regarding the continuous problem of construction traffic accessing the Cambridge Park site from Miller Court. The City has during the last three months, and without success, made several verbal requests to the various Triton Development project superintendents to discontinue all construction traffic on Miller Court, and to use the approved construction access from West 38th Avenue. Also, the City has received several complaints, as recent as September 2, 1996 from Miller Court residents regarding the unauthorized access of construction traffic. Finally, Miller Court was recently slurry sealed by the City as part of the ongoing maintenance program. Based upon this information, please be aware that any future use on Miller Court by construction traffic accessing the Cambridge Park Development will result in the City requiring that Triton Development warranty the existing Miller Court asphalt improvements for a period of one year. In addition, continued construction traffic on Miller Court may result in the City withholding all future building permits for the project until such time as an appropriate solution to this issue can be reached. If ou hav an questions, please contact me at 235-2868. Si ce y, - Greg ;nudson Development Review Engineer cc: Bob Goebel, Public Works Director Glen Gidley, Planning & Development Director John Oss, Sr. Project Engineer Steve Nguyen, Traffic Engineer John Eckert, Chief Building Inspector Fi1e 176 RECEPTION NO. F0221286 16.00 210 RECORDED IN JEFFERSON COUNTY, COLORADO PG: 0001-003 4/23/96 14:09 DEVELOPMENT COVENANT THIS DEVELOPMENT COVENANT, as authorized by the SUBDIVISION REGULATIONS t, of the City of Wheat Ridge, is entered into this 14th day of MarcIl_, 1996 between the City of Wheat Ridge, a Municipal Corporation, hereinafter referred to as City, and Cambridge Ventures, LLC, hereinafter referred to as Owner, and concerns property located at 10241 W. 38th Avenue, Wheat Ridge, Colorado. WITNESSETH: WHEREAS, Owner is the titled owner of a tract of land in the City of Wheat Ridge, County of Jefferson, State of Colorado, more fully described as Cambridge Park Subdivision, City of Wheat Ridge, County of Jefferson, State of Colorado, which property is hereinafter referred to as the "Property"; and WHEREAS, Owner is in the process of constructing a new residence and associated improvements and'is desirous of obtaining a building permit; and WHEREAS, curb, gutter, sidewalk and street improvements bordering the Property and neighboring tracts of land are incomplete and/or below those standards as set forth in the SUBDIVISION REGULATIONS of the City; and WHEREAS, to be uniform and consistent with the existing neighboring improvements, the completion or non-completion of those improvements as required by SECTION FIVE: IMPROVEMENTS of the SUBDIVISION REGULATIONS will make no significant change at the present in those streets fronting the Property and the neighboring tracts of land; and WHEREAS, in order to conform to those requirements as set out in the SUBDIVISION REGULATIONS of the City, this Agreement is hereby determined to be proper. NOW, THEREFORE, IT IS HEREBY AGREED THAT: 1. The responsibility for providing improvements along the street frontage of the Property, as set out in the SUBDIVISION REGULATIONS of the City, is hereby acknowledged by the Owner. 2. The Owner has caused certain improvements to be constructed on the Property and associated on-site improvements. 3. The existing improvement of property frontage along 10241 W. 38th Ave. is below those standards as set forth in the SUBDIVISION REGULATIONS of the City, and the completion of those improvements as required by Section Five: Improvements of the SUBDIVISION REGULATIONS will make no significant change at the present in those streets fronting the property. 4. In accordance with Section 5-45 of the Code of Laws of the City of Wheat Ridge, Colorado, subsection E, the Department of Public works has determined that public improvements along 10241 W 38th Ave. need not be immediately constructed and that execution of this Development covenant is appropriate. The owner agrees to participate in engineering and construction costs for the property's frontage along 10241 W. 38th Ave_ when the street is brought in accordance with City street standards, or as directed by the Director of Public Works. The engineering and construction costs will be limited to those reasonable and necessary to construct 10241 W. 38th Ave. to current local street standards, including earthwork, one half street width paving, curb, gutter and walk, and miscellaneous and incidental items. JD DEVELOPMENT COVENANT Page 2 5. The Director of Public Works shall give written notice and an estimate of costs to the Owner 30 days prior to advertisement of any major improvements to 10241 W. 38th Ave. which would affect the Property and will submit to the Owner a detailed cost breakdown and billing after Award of the construction contract by City Council. The detailed cost estimate will include the Owner's portion of the cost of curb, gutter and sidewalk and associated pavement improvements and other items listed in Paragraph 4. 6. Upon receipt of the detailed cost estimate or billing, the Owner hereby agrees to pay to the City, within 45 days, the full amount of the detailed cost estimate or billing. The owner also agrees to pay to the City any extra costs associated with the Public Improvements to the Property due to variations in estimated contract quantities or as a result of change orders within 30 days of written request for payment by the City. The City will pay to the Owner any overcharges paid to the City by the owner within 45 days after final acceptance of the Public Improvements. 7. Owner agrees to pay for all public improvements or billings within 45 days of written notice; Owner further agreeing that any amount resulting from his failure to pay for any improvement or billing this improvement completed shall constitute a lien upon the property above described in the actual amount of the public improvements or billing completed, less any payments made by Owner, plus interest on the amount unpaid at 10 percent (10%) per annum from the date of final acceptance or billing, plus any costs incurred by the City in collecting same, including court costs and attorney's fees. 8. In the event an Improvement District or a Special Improvement District is created by the City to improve or provide those requirements as set out in the SUBDIVISION REGULATIONS as they exist at the date of execution of this Covenant, for curb, gutter, sidewalk related street and drainage improvements, solely relating to those streets fronting on the property and neighboring tracts of land, the owner or his assigns and successors agree not to oppose its creation, or subsequent reasonable assessment of the costs to the property. 9. In the event an Improvement District is created by the City to provide the improvements as provided by the SUBDIVISION REGULA- TIONS, the costs assessed against the property shall not be disproportionate with costs assessed to other nearby and like properties. 10. This COVENANT is executed by the Owner pursuant to the SUBDIVISION REGULATIONS of the City of Wheat Ridge. 11. The City, in its sole discretion, may require a cash or surety bond to be held in escrow by the City to secure completion or the public improvements described herein. Such cash or surety bond shall be in the sum sufficient to cover the estimated costs of the construction of the, public improvements described herein, said estimate to be made at or about the time of the notice described in Paragraph 5 above. Any interest earned on any escrow funds shall be the sole property of the City. 12. The DEVELOPMENT COVENANT shall be recorded with the Clerk and Recorder of Jefferson County, Colorado, and constitute a continuing covenant running with the land, providing however, that this DEVELOPMENT AGREEMENT shall be released by the City upon the completion of the public improvements and complete and satisfactory payment by the owner of all costs and fees associated therewith r the public improvements described herein, which release shall evidenced by a signed document attested to by the City Cler' bearing the City's seal, which document shall likewise be rr i7) DEVELOPMENT COVENANT Page 3 IN WITNESS WHEREOF, the parties have set their hands and seals on date first shown. RECOMM NDED BY: PubliciWorks Department City Admi istrator EXECUTED BY CITY: Mayor, City of Wheat Ridge EXECUTED BY OWNER: Steven C. Robbins Manager Optimax Limited Liabili Manager, Big Sky _Develoment,L.L Will ZA't' , L. -Ko Community Developmen Department 7!02 AS T O C1t Attorney ty Co. .C. t`on='bevelopment, L.L.C. Sky Development,L.L.C. STATE OF COLORADO ) )ss County of Jefferson) The foregoing instrument was acknowledged before me this 1 19~, by l_' ~Li~ day of G~ ''fir l My commission expires: 19 Notary Public ~'i''✓. C C~'~ 3 The City of 7500 WEST 29TH AVENUE WHEAT RIDGE C080275-6713 (303) 234-5900 GW eat City Admin. Fax M 234-5924 Police Dept. Faz # 235-2949 . -Ridge July 24, 1997 Mr. William Lyons Triton Development, L.L.C. 835 Delaware Street Denver, Colorado 80204 CEERTIFIED MAIL # P963 361 192 Re: Cambridge Park Subdivision, 10241 West 38th Avenue - Notice of Rejection for Future Phase 2 Temporary Certificate of Occupancy & Certificate of Occupancy Applications Dear Mr. Lyons, This letter is to inform you that as of this date the following issues, which Triton Development has been aware of during the past several months, have not been addressed to the satisfaction of the Public Works Department: 1. The letter of certification, for the various drainage improvements, has not been received. As you are aware, Triton Development assured the City that this letter would be submitted, and agreed that temporary certificates or certificates of occupancy could be withheld for any units within phase 2 of this project, if this letter was submitted to the City for approval. As a reminder and for your information, I am including a copy of the map that this department has been, and will continue to use, for determining the phasing boundary. Despite this agreement, it has come to the attention of this department that three certificates of occupancy have been issued for lots 66, 68, and 69. These certificates are all within the phase 2 area of this project, and were never signed off as approved by the Public Works Department. 2. There is still a low area of asphalt along the West 38th Avenue frontage and east of the present construction entrance that has not been properly repaired by Triton Development. Several verbal requests to the site's project manager, Mr. Barry Odean, have been made over the last several months to repair this problem. This area needs to have the existing asphalt removed because of the excessive time that water has been ponding. An asphalt patch (minimum 9-inches in depth) needs to be placed in accordance with City standards. Please notify the City at least 24 hours in advance prior to completing this work to set up an inspection and confirm licensing requirements for the contractor. RECVCLED PAPEF Mr. Bill Lyons Triton Development Page 2 ~ 3. A drainage problem has been created along the entire Miller Court frontage between the back of the new sidewalk and the new fence. Water from the operation of the irrigation system, drains to the low area described. This area need to be regraded as needed to properly convey flows from the Cambridge Park site that are adversely impacting this area. Please be aware that effective immediately, the City of Wheat Ridge will not accept any temporary certificate, or certificate of occupancy applications in Phase 2 of this development until such time as Triton Development has completed the above items to the satisfaction of the City. If you have any questions, please contact me at 235-2868. Sincerely, Bob e 1, P.E. Pub ic W rks Director ry En ineer a / 4- opment Review Engineer GK cc: Robert Middaugh, City Manager Jack Hurst, Interim Planning & Development Director Dave Kotecki, Sr. Project Engineer Meredith Reckert, Senior Planner John Eckert, Chief Building Inspector File = t arayd wl [ asnYd %/6 .'f Lt It1j-i o: t& jL/ 'a{owixmCdo ajo suoiyWo[ [Iy :(luo a3uajajai jol pasn aq oi si qqiy~ siyL ,av,y~oov,x v~nS °II!W 7 Y~BE .i~~unmruon P'~o3 Papnpar y