HomeMy WebLinkAbout9830 W I-70 Frontage Road S+f ! 4(
\i City of
/%woheatjd�ge
CCilJlzINUNITY DEVELOPMENT
Building & Inspection Services Division
7500 W. 29th Ave., Wheat Ridge, CO 80033
Office: 303-235-2855 * Fax: 303-237-8929
Inspection Line: 303-234-5933
Email: Permitsna.ci.wheatridge.co.us
FOR OFFICE USE ONLY
Date:
Plan/Permit #
Plan Review Fee:
Building Permit Application
*** Please complete all highlighted areas on both sides of this form. Incomplete applications
may not be processed. ***
Property Address: 2L , V � � AL A S W m+ VI rk o g
Property Owner (please print): ()-c i
Property Owner Email:
Tenant (Commercial Pi
Phone: -z� � t-� � � -� +q L9
Property Owner Mailing Address: (if different than property address)
Address: `
City, State, Zip:
Architect/Engineer E-mail:
Contractor Name:
City of Wheat Ridge License #: C)"10 'A .74 Z.
Phone:
Phone.
Ii
NICO w 18
Contractor E-mail Address:CA to ZO rv\
For Plan Review Questions & Comments (please print):
CONTACT NAME (please print):
CONTACT EMAIL(p/ease print): J04nptQNI
Sub Contractors (Must provide Wheat Ridge License No.):
Electrical: Plumbing:
W.R. City License # W.R. City License #
Other City Licensed Sub:
City License #
Other City Licensed Sub:
City License #
Mechanical:
W.R. City License #
5 'COMMERCIAL F-1 RESIDENTIAL
n of work: For ALL projects, provide a detailed description of work to be performed,
Descrfgo
includirq°durrent use of areas, proposed uses, square footage, existing condition and proposed new
condition, appliance size and efficiency, type and amount of materials to be used, etc.
Sq. FULF
Amps
a -fie � �nSta�\I �- LtO
BTUs
Squares
Gallons
Commercial Projects Only: Occupancy Type: Construction Type:
Occupancy Load.
Project Value: (Contract value or the cost of all materials and labor included in the entire project)
$ q\1010o0
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or
regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are
accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance
with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner
or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any
entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the
truthfulness of the information provided o the application.
CIRCLE ONE: (OWNER)CONTRACTO&Ior (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR)
Signature (first and last name): -`� ��! DATE: Vilbi LL
Printed Name: L Cx 0'r��m4l�
ZONING COMMMENTS:
Reviewer:
BUILDING DEPARTMENT COMMENTS:
Reviewer:
PUBLIC WORKS COMMENTS:
Reviewer:
DEPARTMENT USE ONLY
OCCUPANCY CLASSIFICATION:
CONSTRUCTION TYPE:
I
Building Division Valuation:
W hea,
U m
\NHEq, Wali Sign Calculation Sheet
O
You must complete this sheet and include it in the submittal package for
any new wall signs. You will also need to create a site plan and a detail
sheet of the signage.
O O`% Address: Wrlv)-�teo'cw
ProjectContractor:
1�
You are allowed 1 square foot of signage for every 1 linear foot of wall to which you are
attaching a sign.
All wall signs must be adjacent to a street or major interior drive.
Step 1: Measure the length of the wall(s) where you are attaching the sign:
Wall 1 - 'Z-�L�, feet Wall 2 -
feet Wall 3 -
feet
Step 2: The length of the wall is the allowable square footage for the wall sign.
Wall 1 allowable signage -
Wall 2 allowable signage -
Wall 3 allowable signage -
Site Pian
square feet
square feet
square feet
,;cc after cv)u .� ��� � 0
cel
-Acv"
of W heat A.
4
s �
City of
o
�
Wh6at14id C 9
COMMUNITY DEVELOPMENT
City of Wheat Ridge Municipal Building 7500 W. 291h Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2855 F: 303.237.8929
ELECTRONIC PAYMENT FORM
"THIS INFORMATION IS NOT STORED FOR FUTURE USE**
DATE: 06/03/2021
COMPANYNAME: CUSTOM LIGHTED SIGNS, LLC
BILLING ADDRESS: 3931 HOLLY ST STE B
DENVER, CO 80207
CONTACT PHONE: 303-292-1882
❑ &Check- City ` ffl create an electronic check
Rounti_ng Number:
Account Number:
(please attach a voided check here)
0 Credit Card Payment (Preferred method of payment)
CARD TYPE: (Check or Circle One) R VISA ❑ MASTERCARD
CARD NUMBER: 4200112800290846
CARD EXPIRATION DATE: 03/23
CW NUMBER: 378
(3 DIGIT NUMBER ON BACK OF CARD)
Certification and Certification and Simnature
I. the applicant for this Electronic Payment Form, warrant the truthfulness of the information provided in this application. I
further attest that I am legally entitled to authorize the City of Wheat Ridge to process any and all charges authorized by me
or my authorized agent to the credit card or banking institution and, through the execution of a Building Permit Application
or any other Application form provided to t e City, and by my signature below, do authorize such charges.
ELECTRONIC SIGNATURE: DATE: 06/ I2021
www.d.wheatridge.co. us
ALL WORK SHALL COMPLY WITH
2018 1 RC
2018 IBC
2018 IECC
2020 NEC
CITY OF WHEAT RIDGE AMENDMENTS
Reviewed for Zoning Compliance by the
City of Wheat Ridge Planning Division
APPROVED
BY:
DATE: 6/18/2021
complies with sign code
COMMENTS: Zoned C-1)
HEATING /COOLING /ELECTRIC
Fabricate and install (1) 50" x 160" S/F LED illuminated wall sign cabinet with Texan face with digital print vinyl overlay. UL Listed.
DO NOT DUPLICATE: This drawing Is the property of Custom Lighted Signs.
The borrower agrees It shall not be reproduced, copied, disposed of, directly or
Indirectly, nor used for any other purpose without the written consent of Custom
Lighted Signs.
Jesse Lanyon
Blue Sky Plumbing & Heating
Address:
9830 W 1-70 Frontage Rd S
City: Slab ;'ZIP:
Wheat Ridge CO 80033
Phone:303-407-7965
3931 Holly St. Unit B
Denver, Co 80207
customltdsigns@yahoo.com
303-292-1882
Fax 303-995-7355 cell
X
Customer Approval
Job No.: Date:
Bid#3 6/18/2021
Order Date: Salesperson:
Lisa Croston
Estimate:
$4,800.00
Terms: 1/2 down remaining due upon installation.
Bid does not include permit fees, $85 per hour to
pull permit or taxes. Cash or Check.
Final Electrical to be done by others.
aw of
W heatl�idge
of Whea,q
'REVIEWED FOR CODE COMPLIANCE"
c� _"
These drawings were reviewed under the applicable
laws in effect at the time of submittal. Reasonable
p - oe
effort was exercised in checking for code compliance.
%aing 00
The stamping of these documents shall not be
construed to be a permit for, or an approval of any
violation of state and/or local codes, ordinances or
amendments thereto.
Plan Reviewer Sones
Date 06/30/2021
ALL WORK SHALL COMPLY WITH
2018 1 RC
2018 IBC
2018 IECC
2020 NEC
CITY OF WHEAT RIDGE AMENDMENTS
Reviewed for Zoning Compliance by the
City of Wheat Ridge Planning Division
APPROVED
BY:
DATE: 6/18/2021
complies with sign code
COMMENTS: Zoned C-1)
HEATING /COOLING /ELECTRIC
Fabricate and install (1) 50" x 160" S/F LED illuminated wall sign cabinet with Texan face with digital print vinyl overlay. UL Listed.
DO NOT DUPLICATE: This drawing Is the property of Custom Lighted Signs.
The borrower agrees It shall not be reproduced, copied, disposed of, directly or
Indirectly, nor used for any other purpose without the written consent of Custom
Lighted Signs.
Jesse Lanyon
Blue Sky Plumbing & Heating
Address:
9830 W 1-70 Frontage Rd S
City: Slab ;'ZIP:
Wheat Ridge CO 80033
Phone:303-407-7965
3931 Holly St. Unit B
Denver, Co 80207
customltdsigns@yahoo.com
303-292-1882
Fax 303-995-7355 cell
X
Customer Approval
Job No.: Date:
Bid#3 6/18/2021
Order Date: Salesperson:
Lisa Croston
Estimate:
$4,800.00
Terms: 1/2 down remaining due upon installation.
Bid does not include permit fees, $85 per hour to
pull permit or taxes. Cash or Check.
Final Electrical to be done by others.
otWhearq.
9
U m
Off, Ing DMso
Fabricate and install (1) 50" x 160" S/F LED illuminated wall sign cabinet with lexan face with digital print vinyl overlay. UL Listed.
DO NOT DUPLICATE: This drawing is the property of Custom Lighted Signs.
The borrower agrees it shall not be reproduced, copied, disposed of, directly or
indirectly, nor used for any other purpose without the written consent of Custom
Lighted Signs.
Jesse Lanyon
Company:
Blue Sky Plumbing & Heating
Address:
9830 W 1-70 Frontage Rd S
City: Slate/ZIP:
Wheat Ridge CO 80033
303-407-7965
Fax
3931 Holly St. Unit B
Denver, Co 80207
customltdsigns@yahoo.com
303-292-1882
303-995-7355 cell
X
Customer Approval
lob No.. Date:
Bid#3 6/18/2021
Drdur Date. Salesperson:
Lisa Croston
Estimate:
$4,800.00
Terms: 1/2 down remaining due upon installation.
Bid does not include permit fees, $85 per hour to
pull permit or taxes. Cash or Check.
Final Electrical to be done by others. ,
I(
T
{ 3 ixer�
f
RE
i
EXISTING ALICN W TH NE:'"
236.5$A Ct'
3830 Interstate 7y0rFrrar�e Rd;� I29
Lk
he
ug
I d all m&lAmLhwl'
A
m A
,r
1 U(.u...ze... ..:,..i;C_�....... _• ! :^7 .. �.Mr.1�.�M�w.r�...,.•-•....+ _ .. �,:,,IR,�w '� Mww:
■rr17
BLUE SKY PLUMBING
130 W k70 FRONTAGE RD S
WHEAT RIDGE, CO 80033
Google Earth
awn City of
Wheatl e
' ON(MUNi1Y DEVELOPMENT
Building & Inspection Services Division
7500 W. 29t' Ave., Wheat Ridge, CO 80033
Office: 303-235-2855 * Fax: 303-237-8929
Inspection Line: 303-234-5933
Email: permits(cjcimheatridge.co.us
FOR OFFICE USE ONLY
Date:
Plan/Permit #
Plan Review Fee:
Building Permit Application
*** Please complete all highlighted areas on both sides of this form. Incomplete applications
may not be processed. ***
Property Address:
1
Property Owner (please print): j
Property Owner Email:
Tenant (Commercial Pi
Phone:-
I/
hone:-
Property Owner Mailing Address: (if different than property address)
Address: t `
City, State, Zip:
Architect/Engineer E-mail:
Contractor Name:
City of Wheat Ridge License #: CY 04 74
Ii
Phone.
LILct
Phone:
Contractor E-mail Address:AAS7 OV1r) 4 Si Ia/3S t a AV)C 10,
Nj
For Plan Review Questions & Comments (please print):
CONTACT NAME (please print):
hone:,1-��I1 11
CONTACT EMAIL(p/ease print): AMY"N
Sub Contractors (Must provide Wheat Ridge License No.):
Electrical: Plumbing:
W.R. City License # W.R. City License #
Other City Licensed Sub:
City License #
Other City Licensed Sub:
City License #
Mechanical:
W.R. City License #
COMMERCIAL
RESIDENTIAL
Descr, on of work: For ALL projects, provide a detailed description of work to be performed,
includinurrent use of areas, proposed uses, square footage, existing condition and proposed new
condition, appliance size and efficiency, type and amount of materials to be used, etc.
Sq. FULF
Amps
BTUs
Squares
Gallons
Commercial Projects Only: Occupancy Type: Construction Type:
Occupancy Load:
Project Value: (Contract value or the cost of all materials and labor included in the entire project)
$ gr100001
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or
regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are
accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance
with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner
or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any
entity included on this application to list that entity on this application. 1, the applicant for this building permit application, warrant the
truthfulness of the information provided_ w the application.
CIRCLE ONE: (OWNER)CONTRACTOR o^r (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR)
Signature (first and last name): DATE:
Printed Name: Li�)(N,
ZONING COMMMENTS:
Reviewer:
BUILDING DEPARTMENT COMMENTS:
Reviewer:
PUBLIC WORKS COMMENTS:
Reviewer:
DEPARTMENT USE ONLY
OCCUPANCY CLASSIFICATION:
CONSTRUCTION TYPE:
Building Division Valuation:
Wall Sign Calculation Sheet
4VFayN
)j
s
You must complete this sheet and include it in the submittal package for
any new wall signs. You will also need to create a site plan and a detail
sheet of the signage.
Project Address: `�60 W ��L
Contractor:
You are allowed 1 square foot of signage for every 1 linear foot of wall to which you are
attaching a sign.
All wall signs must be adjacent to a street or major interior drive.
Step 1: Measure the length of the wall(s) where you are attaching the sign:
Wall 1 - 2 , s. 5 ' feet Wall 2 -
feet Wall 3 -
feet
Step 2: The length of the wall is the allowable square footage for the wall sign.
Wall
1
allowable
signage -
Wall
2
allowable
signage -
Wall
3
allowable
signage -
Site Plan
square feet
square feet
square feet
1i \ Ckv1
•' ► e �r City of
�Wheat idge
MUNITY DEVELOPMENT
City of Wheat Ridge Municipal Building 7500 W. 29`h Ave. Wheat Ridge, CO 80033-8001 P: 303.235.2855 F: 303.237.8929
ELECTRONIC PAYMENT FORM
**THIS INFORMATION IS NOT STORED FOR FUTURE USE**
DATE: 06/03/2021
coMPANYNAME. CUSTOM LIGHTED SIGNS, LLC
BILLING ADDRESS: 3931 HOLLY ST STE 6
DENVER, CO 80207
CONTACT PHONE: 303-292-1882
❑ E-Check- Citv will create an electronic check
Rounting Number: Account Number:
(please attach a voided check here)
Credit Card Payment (Preferred method of payment)
CARD TYPE: (Check or Circle One)
CARD NUMBER: 4200112800290846
CARD EXPIRATION DATE: 03/23
CVV NUMBER: 378
8 VISA ❑ MASTERCARD
(3 DIGIT NUMBER ON BACK OF CARD)
Certification and Signature
I, the applicant for this Electronic Payment Form, warrant the truthfulness of the information provided in this application. I
further attest that I am legally entitled to authorize the City of Wheat Ridge to process any and all charges authorized by me
or my authorized agent to the credit card or banking institution and, through the execution of a Building Permit Application
or any other Application form provided to t e City, and by my signature below, do authorize such charges.
ELECTRONIC SIGNATURE: DATE:06/it/2021
www.ci.wheatridge.co. us
ALL WORK SHALL COMPLY WITH
20181RC
20181BC
20181ECC
2020 NEC
CITY OF WHEAT RIDGE AMENDMENTS
Reviewed for Zoning Compliance by the
City of Wheat Ridge Planning Division
APPROVED
BY:
DATE:6/18/2021
complies with sign code
COMMENTS: Zoned C-1)
HEATING / COOLING / ELECTRIC
Fabricate and install (1) 50" x 160" S/F LED illuminated wall sign cabinet with lexan face with digital print vinyl overlay. UL Listed,
DO NOT DUPLICATEI This drawing Is the property of Custom Lighted Signs,
The borrower agrees It shall not be reproduced, copied, disposed of, directly or
Indirectly, nor used for any other purpose without the written consent of Custom
Lighted Signs.
Jesse Lanyon
Company:
Blue Sky Plumbing & Heating
Address:
9830 W 1-70 Frontage Rd S
City: Slats/ZIP:
Wheat Ridge CO 80033
Phone: 303-407-7965
3931 Holly St. Unit B
Denver, Co 80207
customltdsigns@yahoo.com
303-292-1882
303-995-7355 cell
X
Customer Approval
�Job Nos: Dale:
Bid#3 16/18/2021
Lisa Croston
1 $4,800.00
Terms: 1/2 down remaining due upon installation.
Bid does not include permit fees, $85 per hour to
pull permit or taxes. Cash or Check.
Final Electrical to be done by others.
c1.r
.'✓win.urvxnruPwurvw'\�'�
0 p hear
"REVIEWED ECR CODE COMPLIANCE"
H«
These drawings were reviewed under the applicable
laws In effect at the time of submittal Reasonable
0, 4�
effort was exercised In checking for code compliance.
�ImJ OM.
The stamping of there documents shall not be
construed to be a permit for, or an approval of any
violation of state and/or local codes, ordinances or
amendments thereto.
Plan Reviewer Sones
Date 06/30/2021
ALL WORK SHALL COMPLY WITH
20181RC
20181BC
20181ECC
2020 NEC
CITY OF WHEAT RIDGE AMENDMENTS
Reviewed for Zoning Compliance by the
City of Wheat Ridge Planning Division
APPROVED
BY:
DATE:6/18/2021
complies with sign code
COMMENTS: Zoned C-1)
HEATING / COOLING / ELECTRIC
Fabricate and install (1) 50" x 160" S/F LED illuminated wall sign cabinet with lexan face with digital print vinyl overlay. UL Listed,
DO NOT DUPLICATEI This drawing Is the property of Custom Lighted Signs,
The borrower agrees It shall not be reproduced, copied, disposed of, directly or
Indirectly, nor used for any other purpose without the written consent of Custom
Lighted Signs.
Jesse Lanyon
Company:
Blue Sky Plumbing & Heating
Address:
9830 W 1-70 Frontage Rd S
City: Slats/ZIP:
Wheat Ridge CO 80033
Phone: 303-407-7965
3931 Holly St. Unit B
Denver, Co 80207
customltdsigns@yahoo.com
303-292-1882
303-995-7355 cell
X
Customer Approval
�Job Nos: Dale:
Bid#3 16/18/2021
Lisa Croston
1 $4,800.00
Terms: 1/2 down remaining due upon installation.
Bid does not include permit fees, $85 per hour to
pull permit or taxes. Cash or Check.
Final Electrical to be done by others.
o hear
ti
i m6Wme a�`� i
Fabricate and install (1) 50" x 160" S/F LED illuminated wall sign cabinet with lexan face with digital print vinyl overlay. UL Listed.
DO NOT DUPLICATE! This drawing is the property of Custom Lighted Signs.
The borrower agrees It shall not be reproduced, copied, disposed of, directly or
Indirectly, nor used for any other purpose without the written consent of Custom
Lighted Signs,
Jesse Lanyon
Blue Sky Plumbing & Heating
9830 W 1-70 Frontage Rd S
City: Slate/ZIP:
Wheat Ridqe CO 80033
303-407-7965
3931 Holly St. Unit B
Denver, Co 80207
customltdsigns@yahoo.com
303-292-1882
303-995-7355 cell
Customer Approval
Bid#3 6/18/2021
Order Date: Salesperson:
Lisa Croston
,800.00
Terms: 1/2 down remaining due upon installation.
Bid does not include permit fees, $85 per hour to
pull permit or taxes. Cash or Check.
Final Electrical to be done by others.
...--..�'^""".�+.^^"'�..+,.w•_..-...�^r.w.«�R...�+^_•'"�,..�°'r"'"r,.o-'a�•"'.""'W'.�ww�_,.w+.�..wwmen,wwwmr+'.,.«,w�.w,rv,.,w;:vw_;_ �..,.s.,s��.....................,�.,,,�,,,,µ.�+�.'v^�.>r,.,.+,r...."'""---+...�.. �" �u .
e
r
•V y
i 1
9ry
'REIA EXISTING A;L I .N. W TiW _NfE
taog f
41,
R
�,-------__-_---------- 236.5
•' � r` r
961,30 Interstate 760Frantage Rd IS,L
W l.
_ Wnxw
;t
,
i ,{1
i
47 !
21 OIL_
n W N ......�. .,.... .. rr M - ....... .,..,.„.,..,
yy
R'
mu * • � _�. �°h }' xc1MlYYly1 , .. Y I a
to Ya: A ��� wWr If BLUE SKY PLUMBLING
-•• - - 't 9830 W 1•-70 FRONTAGE RD S
LL L LlWHEAT RIDGE, CO 80033
71 71777!�Ljl(
Google Earth
+*
� ► 44" City of Wheat Ridge
'/� Commercial Sign PERMIT - 202101190
PERMIT NO: 202101190 ISSUED: 07/02/2021
JOB ADDRESS: 9830 I 70 Frontage Rd S EXPIRES: 07/02/2022
JOB DESCRIPTION: FABRICATE AND INSTALL (1) NEW LED ILLUMINATED WALL SIGN 55.59 sq ft
(50"x160")
Tenant: Blue Sky Plumbing Heating Cooling Electric
*** CONTACTS ***
OWNER (303)431-0232
GOING GREEN, LLC
SUB (303)292-1882
L ISA & TYLER CROSTON
020472 CUSTOM LIGHTED SIGNS, LLC
*** PARCEL INFO ***
ZONE CODE:
UA / Unassigned
USE: UA / Unassigned
SUBDIVISION CODE:
UA / Unassigned
BLOCK/LOT#: 0 /
*** FEE SUMMARY ***
ESTIMATED
PROJECT VALUATION: 41200.00
FEES
Total Valuation
0.00
Plan Review Fee
81.28
Use Tax
88.20
Permit Fee
125.05
** TOTAL **
294.53
*** COMMENTS ***
*** CONDITIONS ***
A printed copy of the permit and city stamped on-site plans must be available on-site for
the first inspection.
Approved per plans and red -line notes on plans. Must comply with 2018 IBC, 2020 NEC and all
applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections.
**Prior to final inspection approval - As-builts are required before approval of the
Building Final Inspection and Certificate of Occupancy can be issued.
1* � 4 41'
PERMIT NO:
JOB ADDRESS:
JOB DESCRIPTION:
City of Wheat Ridge
Commercial Sign PERMIT - 202101190
202101190 ISSUED: 07/02/2021
9830 I 70 Frontage Rd S EXPIRES: 07/02/2022
FABRICATE AND INSTALL (1) NEW LED ILLUMINATED WALL SIGN 55.59 sq ft
(50"x160")
Tenant: Blue Sky Plumbing Heating Cooling Electric
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this�permrt. I further attest that I am leg ally authorized to include all entities named within this document as parties to the work to be
performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signature of OWNER or CONTRACTOR (Circle one) Date
1, This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180, days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees and��procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all requ�ired
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, anviolation of any provision of any
�pplicabje code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
07/02/2021
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
� ► 44" City of Wheat Ridge
'/� Commercial Exterior Remodel PERMIT - 202001257
PERMIT NO: 202001257 ISSUED: 07/15/2020
JOB ADDRESS: 9830 W I-70 Frontage Rd S EXPIRES: 07/15/2021
JOB DESCRIPTION: Install two overhead doors on the west bays; remove drywall walls - 3,500
sq ft total
*** CONTACTS ***
OWNER (303)467-8732 LAG
B OMER PARTNERSHIP
GC (303)595-0214 DON
CALAHAN
170479 CALAHAN
CONSTRUCTION SERVICES
*** PARCEL INFO ***
ZONE CODE: UA /
Unassigned
USE:
UA / Unassigned
SUBDIVISION CODE: 550
/ Medical Office
BLOCK/LOT#:
0 /
*** FEE SUMMARY ***
ESTIMATED
PROJECT VALUATION:
14,260.00
FEES
Total Valuation
0.00
Plan Review Fee
184.31
Use Tax
299.46
Permit Fee
283.55
** TOTAL **
767.32
*** COMMENTS ***
*** CONDITIONS ***
A printed copy of the permit and city stamped on-site plans must be available on-site for
the first inspection.
Approved per plans and red -line notes on plans. Must comply with 2012 IBC, 2017 NEC and all
applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections.
**Prior to final inspection approval - As-builts are required before approval of the
Building Final Inspection and Certificate of Occupancy can be issued.
1* � 4 41'
PERMIT NO:
JOB ADDRESS:
JOB DESCRIPTION:
City of Wheat Ridge
Commercial Exterior Remodel PERMIT - 202001257
202001257 ISSUED: 07/15/2020
9830 W I-70 Frontage Rd S EXPIRES: 07/15/2021
Install two overhead doors on the west bays; remove drywall walls - 3,500
sq ft total
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this�permrt. I further attest that I am leg ally authorized to include all entities named within this document as parties to the work to be
performed and that all work to be performed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signature of OWNER or CONTRACTOR (Circle one) Date
1, This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180, days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees and��procedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all requ�ired
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, anviolation of any provision of any
applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
From: no-reolv(alci.wheatridae.m. us
To: CommDev Pets
Subject: Online Form Submittal: General Permit Application
Date: Monday, July 6, 2020 9:05:25 AM
General Permit Application
This application is exclusively for Scopes of Work that do not already have a
specific form.
YOU MUST ATTACH AN ELECTRONIC PAYMENT FORM IN ORDER FOR THE
PERMIT TO BE PROCESSED.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
WORK UNTIL PERMIT HAS BEEN ISSUED.
PROPERTY INFORMATION
Property Address 9830 West Interstate 1-70 Wheat Ridge CO 80033
Property Owner Name Lag 3'0mer LLC Nina Thomas
Property Owner Phone
Number (enter WITH
dashes, eg 303-123-
4567)
Property Owner Email
Address
Attach City of Wheat
Ridge Electronic
Payment Form - "DO
NOT ATTACH A
PICTURE OF A
CREDIT CARD"
CONTACT INFORMATION
Submitting General
Contractor or Architect
Contractor's License
Number (This is a 5 or
6 digit number for the
City of Wheat Ridge)
Contract Phone
Number (enter WITH
dashes, eg 303-123-
4567)
303-565-3013
nthomas@shamesmakovsky.com
Calahan Construction Services
170479
303-595-0214
Contact Email Address don@calahan.com
Retype Contact Email don@calahan.com
Address
01 :K161 Cl 191 [*] 0 N] ayOli bl S 2/
Detailed Scope of
On the west 2 bays of the building install overhead door on the
Work - Provide a
backside of the building (south side) not affecting anything
detailed description of
structural on the metal building and remove drywall walls.
work including
mechanical, electrical,
plumbing work
occurring,
adding/removing walls,
etc.
Square footage of
3500
scope of work
Location of work
Inside and back south side of the building on the west
(backyard, on roof, etc)
Project Value (contract
$14,260
value or cost of ALL
materials and labor)
Upload Engineer letter,
Field not completed.
other documents on 8
1/2" x 11 "
Upload Asbestos Report 9830 W 1-70 Frontage Rd Wheat Ridge CO Asbsetos
Report if triggler level is Inspection Report. odf
met per CDPHE
regulation.
Upload Drawings 11" x Stamped A-1.pdf
17" or larger
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full Yes
responsibility for
compliance with
applicable City of
Wheat Ridge codes
and ordinances for
work under any permit
issued based on this
application.
I understand that work Yes
may not begin on this
property until a permit
has been issued and
posted on the property.
I certify that I have Yes
been authorized by the
legal owner of the
property to submit this
application and to
perform the work
described above.
I attest that everything Yes
stated in this
application is true and
correct and that
falsifying information in
this application is an
act of fraud and may
be punishable by fine,
imprisonment, or both.
Person Applying for Don calahan
Permit
Email not displaying correctly? View it in your browser.
Saved Permit Application
Address:
Addr/Strnat 9830 West Interstate 10 Frontage Road
City/Stam: Wheat Ridge CO
Zip Code: 80033
First Name: Nina
Last Name: Thomas
Business Name: LAG B -Omer LLC
Phone: 3035653013
Phone AH:
Cell Phone:
Fax
AJde 1900 Glenarm Place
Suit: 100
City/Stt: Denver OO
Zip Code: 80202
Email: mthomas@sbamesmakovskycorn
Occu an[
Building:
np- named .sm.rdn.e
Occupant:
Vacant
Suit:
Property Use Type:
Commercial
Job
Job Type:
Tenant FinisNRemodel
Sit Ft:
3,20000
Cost:
$14,20000
Desc.
Add overhead door to south
side of building and remove
interior drywall walls.
Comments:
Upload Files:
File Name
Plans?
Upload Dam
Stamped A-1.put1/12020
1
112221 AM ' Delet=
35196
July 2, 2020
ED James Jacobs
Calahan Constructor Services
1661 Wadsworth Blvd
Lakewood, Colorado 80214
RE: AsbestrinContaining Building Materials Inspection
9830 W. 1 7 Frontage Road, Units B anti C, Wheat Ridge, Colorado
Fanner Envlrmu Cental Gronp Project No. 5435.01
ED Jacobs
Enclosed is Fanner Env vonmental Group LLC's AsbertnsContaining Building Materials
Inryedion Report for the office/warehouse building located at 9830 W I70 Frontage
Road, Wheat Ridge, Colorado including bulk sample results, sample location drawings,
and photographic documentation
Fanner Environmental Group appreciates this No crhmity to provide asbestos consulting
services to Calahan Construction Services We have joyed working with you on this
project and look forward to meeting your needs in the fuhse Should any questions arise
mnceming this report, please commons at (303)468 8763
Sincerely,
Jennifer Day
Environmental Specialist
Farmer Envlrmu Cental Gronp, DEC
cav a
7/8/2020- No asb estus indicated b eivg presentiv area of Wheat Ridge
remodel No recruit 2 20012 RS
Building Division
8120 Sheridan Blvd, Ste. h306 - Mani CO 80003. Office: 303.468.8183
ASBESTOS -CONTAINING BUILDING MATERIALS INSPECTION
REPORT
OFFICE/WAREHOUSE BUILDING
9X30 W.I- FRONTAGE ROAD, UNITS B and C
WHEAT RIDGE, COLORADO bl
Prepared for:
Calahan Construction Services
1661 Wadsworth Blvd
Lakewood, Colorado b0214
Prepared by:
Farmer Environm®gI Group LLC
8120 Sheridan Blvd, Suite AW6
Westminster, Coloratlo bl
(303) 46X8763
Former Enviroamoca l Group Project No. 5435.01
July 2, 2020
civ of
Wheat Ridge
Building Division
8120 Sheridan Blvd, Ble. h306 - Montrealer, CO 80003. Office: 303.468.8183
TABLE OF CONTENTS
H
SUMMARY OF FINDINGS& RECOOBAENDATIONS.........._______________1
III.
SCOPEOFWORK _____2
N.
METHODS& SAMPLING STRATEGY ____2
V.
FACIDHY DESCRUTION __. ____.3
VL
SAMPLERESULTS ____.3
VII.
ASBESTOS AND NON- ASBESTOS PRODUCTS IN THE FAC ITY________3
VII.
ASBESTOS HEALTH HAZARD CONSIDERATIONS ............_______________4
n.
RECOMMENDATIONS......... ____.5
X
LIMITATIONS ________.6
MUMOOMM
Appendix I:
Bulk Sample Analysis
Appendix B:
Bulk Sample Locati on and ACM Drawing
Appendix III:
Photographic Documentation
Appendix N:
Licenses and Certiti can ons
ow or
Wheat Ridge
Building Mislon
ASBESTOS -CONTAINING BUILDING MATERIALS INSPECTION
REPORT
OFFICE/WAREHOUSE BUILDING
9&30 W. 1-70 FRONTAGE ROAD, UNITS B and C
WHEAT RIDGE, COLORADO 50033
July 2, 2020
I. INTRODUCTION
Fanner Environmental Group, LLC (Fanner) inspected Deplaned renovation areas within
the ofhcebvarehouse building Units B and C this Site) located at 9830 W IAO Frontage
Road in Wheat Ridge, Colorado for asbestos containing building materials (ACBhk on
June 30, 2020. Colorado Department ofPublic Health and Envvonment(CDPHE}licensed
Asbestos Inspedor Jennifer Day (license #7191) conducted this inspection under an
agreernentbetween Fanner and Calahan Construction Services
The purpose of the inspection was threefold. 1) deremiine locations and conditions of
asbestos containing products used at the Site, 2) detarnine the impactthese matenals will
have on scheduled renovation activities, and 3) assist Calahan Construction Services and/or
their client in obtaining the necessary building permit with the City of Wheat Ridge or
CDPHE This Inspection Report presents reccnvnendatrons for reducing potential health
hazards associated with asbestos products at the Site
H. SUMMARY OF FINDINGS
Based on the laboratory analysis of Us bulk samples collected, the following non friable
materials were identified in UnitB.
Based on the laboratory analysis of the bulk samples collected, no asbestos containing
materials were identified Anne She in Unit C
Additional bulk samples should be collected Gom previously concealed materials Ratmay
be revealed during demolition activity, or from matenals outside the original inspection
scope of work "Suspect" matenal includes any matenal saving as a sprayed on or can a
Doweledonacoustic or fireproofing surface, floor and ceiling tiles, transits panels, siding Wheat Ridge
or shingles, thermal insulation or any material associated with mechanical rys[erns, or any
eonao-� owiaoo
ms
MaRcialDes¢iptl®
Quantlty
based
Kitchen and Ove
Black Doanic
100 SF
3%Cluysodle
Bathroom, under sheet
vinyl
Based on the laboratory analysis of the bulk samples collected, no asbestos containing
materials were identified Anne She in Unit C
Additional bulk samples should be collected Gom previously concealed materials Ratmay
be revealed during demolition activity, or from matenals outside the original inspection
scope of work "Suspect" matenal includes any matenal saving as a sprayed on or can a
Doweledonacoustic or fireproofing surface, floor and ceiling tiles, transits panels, siding Wheat Ridge
or shingles, thermal insulation or any material associated with mechanical rys[erns, or any
eonao-� owiaoo
binding agent mm as lar sealant, mastic adhesive, rooting bar, ranking, d cetera CDPHD
regulations require bulk samples in public buildings be collected by a licensed asbestos
inspector or individual asbestos conmltant
III. SCOPE OF WORK
The Scope of this comhad included the following tasks
TASK A visual inspection of all accessible btericrbuilding spaces atthe Site Bulk
samples of suspect materials were collected and analyzed by polarized light
microscopy DEM)
TASK 2 Report writing This Inspection Report includes the following Information
analytical results of bulk samples collected to verify asbestos content of
suspect materials, description of sample locations, a description of the
condition of asbestos found during the inspection, and an asbestos
management strategy for the Site
IV. METHODS & SAMPLING STRATEGY
Samplmgwas limit dtoareas ofproposed renovation All accessible building spaces within
the scheduled renovation areas at the Site were viewed and mspectmaterials touched by the
inspectortodeteminethelocatm,comd±lion, a ndfnebilityofobsa edasb tosmatnal.
All bulk samples were submitted for PLM analysis. In Compliance with the CDPHE, a
minimum of two bulk samples were collected for each homogeneous area of surfacing
material and two samples of miscellaneous materials were collected By definition, a
homogeneous area means an area of mrfacing material, thermal system insulation material,
or miscellaneous material that is uniform in color and Centore and is installed within the
same period Farmercollected 19 samples of accessible finish out materials in Unit C and
8samplesin Unit B. Unit Cis schedule for renovation/danolition activities while Unit
is undergoing cosmetic updates Sampling in Unit B is for lnformatioNplanning purposes
only and is not a complete inspection for renovations.
Every reasonable effort was made to view materials with restrided access However, no
demolition activities were performed Therefore, this reportmay omit asbestos materials
found behind false ceiling wall, and/or flooring materials Fanner has had admsive
experience with older buildings That have been abated prior toreovation projects
Occasionally, additional asbestos was discovered during demolition of Concealing ceiling,
wall, and/or flooring materials.
BBV a
Wheat Ridge
BulldingDivision
V. FACMITYDESCRIPTION
At the time of the inspection, the Site consisted of a single -story stand-alone building
encompassing approximately 19,200 square feettotal. Unita is approxi mately4,200 square
feet while Unit C is approximately 3,200 square feet Interior finishes consist of drywall,
metal siding and framing carpet tloortile, sheetvinyl, covebase and lay in acoustic ceiling
tile
VI. SAMPLE RESULTS
The PLM Report in Appends; I shows the results of PLM analysis for bulk samples
collected date Site, as required under Task t above The PLM Report shows theroom or
area in which the samplewas collected and provides a description ofthe sampled material
Site drawings are included in Appendix II and homogeneous area photographs are included
in Appends; III.
Any product Containing more than 1% fibrous asbestos, when analyzed by PLM, is
considered a potential hazard by the United States Environmental Protection Agency (US
EPA) PLM is the US EPArecognizedmethod for deternining fibrous bulk asbestos
content Additionally, the US EPA indicates that further analysis by point counting be
performed to contvm asbestos Content for Enable materials found to contain less than ten
percent asbestos by visual area estimation Point counting analysis may be omitted if the
material is assumed to Contain more than one percent asbestos and is then handled
accordingly. All samples collected by Famcer were analyzed by EMSL Analytical, Imo's
NVLAP accredited laboratory in Denver, Colorado
Sample analysis reported as "None Detected" should be interyreted as meaning no asbestos
s observed in the suspect material above the reliable limit of detection, hob by visual
estimation) for the PLM method.
Sample analysis reported as "Not Analyzed — Positive Stop" should be interyreted as
meaning a sample ofthe samehomogeneous material was analyzed with an asbestos content
greaterthan 1% Further analysis is therefore considered unnecessary.
VII. ASBESTOS AND NONASBESTOSPRODUCTS Ea THE FACILEPY
No asbestos products were identified at me Site
The following products were tested and found to contain no asbestos when analyzed by
PLM my of
Wheat Ridge
Bulldir Division
Unit
1. Tan Sheet Vinyl
2 Tan Sheet Vinyl Mastic
3. White Floor Leveling Compound
4. Gray Sheet lnyl
5. 12' x 1Z' White Floor Tile
5 Yellow Mastic
7. Gray Cove Base
8 Tan Cove Base Mastic
9. Smooth Texture
10. Drywall Tape
11. Joint Compound
12 Drywall
13. 2' x 4' Ceiling Tile
Unit
1.
Black M=Mastic
2
Yellow Minor Mastic
3.
Yellow Carter Glue
4.
Tan Cove Base Mastic
5.
12' x 1Z' White Floor Tile
5
Yellow Floor T ile Mastic
7.
2' x 4' Lay in Ceiling Tile
8.
Smooth Texture
9
Tape
10.
Joint Compound
11.
Drywall
VIII. ASBESTOS HEALTH HAZARD CONSIDERATIONS
Friability is the Characteristic of a substance describing its ability to be Bumbled,
pulverized, or reduced to powder by hand pressure Men applied or asbestos containing
substances, friability describes the mbstance's Cyber release potential Because asbestos
becomes a health hazard when inhaled ordi the more likely an asbestos containing
substance is to crumble whendist rced the greaterifs hazard potential
Generally, any area open to air movement should be maintained free of Enable material.
This means broken or loose fibrous materials should be deemed up and repaired if doing so
will not produce more of a fiber release hazard than already exists According to CDPHD,
an Abatement Contractor licensed by CDPHD must perform repairs or other " intentional rely of
disturbance of any amount ofasb estos-Containing material"
Wheat Ridge
During Fare's June 30, 2020 imperson, no asbestos health hazard concerns we®mlaingoutsion
observed
R
ENVIRONMENTAL
IX. RECOMMENDATIONS
Based on observations made Ane Site, and results ofthe analysis ofbulk samples collected
during the inspection, FArmerrcoommends the following:
1. CDPHE dictates that only a licensed Asbestos Abatement Contractor can remove,
repay, enclose, or encapsulate asbestos containing material. CDPHE further dictates
that me asbestos abatement activity be monitored by a licensed Asbestos Consultant
2 According to CDPHE, they must be notified of any asbestos abatement of a shudure
regardless of size Notifications must be postrnarked at least 10 working days before
initiating abatement activities and must be made using CDPHEforms
3. To comply with National Emission Standards for Hazardous Air Pollutants(NESHAP)
asbestos regulation (EPA 40 CFR 61, Subpart M), Fanner recommends removing all
Enable and non Diable ACBM thathas me potential to become Diable under abatement
conditions priorto renovation or demolition activities.
4. Additional bulk samples should be collected from previously concealed materials that
may be revealed during demolition activity, or from materials outside the original
inspection scope of work. "SuTed" material includes any material saving as a
sprayed on or Doweled on acoustic or fireproofing surface, floor and ceiling tiles,
transits panels, siding or shingles, thermal inmlation or any material associated with
mechanical sys erns, or any binding agent such as tar sealant, mastic adhesive, rooting
far, ranking, D cetera CDPHEregulations requirebulk samples in publicbuildings be
collected by a licensed asbestos inspector or individual asbestos conmltmt
5. The building ower should be aware that removing ACBM does not discharge
ownership During transport or after burial in an EPAapprovedlandfill, any
contamination throughout me lifetime of the material remains the responsibility of the
building owner.
6 If any material cannot be positively identified as non -asbestos containing by the
analytical results of samples collected during this inspection, it should be treated as
asbestos until a sample of me newly identified suspect material can be collected and
analyzed by PLM
7. During renovation activities, Calahan should ascertain the Contents of my new products
(obtain Material Safety Data Sheets) installed in the building that would void the
accuracy and validity of this inspection report
CRv or
4 According to the Occupational Safety and Health Administration (OSHA) 29 C oil at Ridge
Federal Regulations (CFR) 1926 1101, building end/or facility curves shell votify e
following persons of the presence, location, and quantity of asbestosconfa Wong Division
materials, atme work sites in their buildings Notification either shall be in writing or
R
ENVIRONMENTAL
shall consi4 of a personal communication between the owner and the person to whom
notification must be given or their authorized representative
a) Prospective employes applying crbidding for work whose employees reasonably
can be expected to work in or adjacent to areas containing such material,
b Employees of the owner who will work in or adjacent to areas containing such
material,
) On mule employework sites, all employers ofemployeeswho will be performing
work within or adjacent to areas containing mon materials,
d) Tendrils who will occupy areas containing mon material
Farmer has endeavored to inspect the existing conditions within the affected areas using
CDPFIE inspection protocols. Regardless of me thoroughness of an inspection, it is possible
that some areas containing asbestos were overlooked or inaccessible This report presents
general descriptions of various construction materials and the general locations where these
materials were encountered Ifquetions arise during the planning forrenovation, demolition
or other cons miction, Fanner should be notified to permit a review of the sibration and to
present reconvnendations
This report has been prep ared on behalf of and exclusively for the use ofCalahan Construction
Service and persons or organizations to which Calahan Construction Services wishes to
make this report available The conclusions expressed by Fanner regarding the conditions
of the site are based solely on the observations made on June 30, 2020, the data collected
during this inspection, and the laboratory results of me sample collected and analyzed The
beneficiaries are hereby adv ised that conditions observed are mbj edtochange This mor cat
and the findings contained herein shall not, in whole or in part, be dissenlnated or conveyed
to any other party or be used or relied upon by any other party, in whole or in part, without
C`aall`araa^n Construction Services orFarmers prior written consent
Y
Jennifer Day
CDPFIE Building Inspector 17191
Farmer Envhrmm®tal Grfmg LLC
any of
Wheat Ridge
Building Division
APPENDIX
BULK SAMPLE ANALYSIS
BXv a
Wheat Ridge
Bulldi� Division
Site: 9830 W 1-70 Frontage Road, Unit B, Wheat Ridge, CO
Project Number: 5435.01
Farmer Environmental Group, LLC
Data Summary Table
Survey Type (Comprehensive, Limited, Demolition): Limited
Construction Date: 19782006 Areas: Interior
Homogeneous
Application
Material Description
Sample ID
Friable
(F, NF)
Condition
(G, D, SD)
ACBM
Classification
(1-7)
Type (T,S,M)
Approximate
Quantity
Sample Location / Notes
1
Tan Sheet Vin
A50805
F
G
NA
M
Back Restroom off kitchen
2
Gray Sheet Vin
A50806
F
G
NA
M
kitchen
3
12"x12" Floor Tile
A50807
NF
G
NA
M
back room east of kitchen
4
lGray Cove Base wlfan Mastic
A50808
NF
I G
NA
M
lback room west side
5,6
Smooth Texture on Drywall
A50809
F
G
NA
S,M
rece tion desk
5,6
Smooth Texture on Drywall
A50810
F
G
NA
S,M
center hall/work area
7
Joint Compound
A50811
F
G
NA
M
IT room
8
2'x4'Ceiling Tile
A50812
F
G
NA
M
reception desk
Inspector Name: Jennifer Day
T = TSI, S = Surfacing, M = Miscellaneous, SF = Square Feet, LF = Linear Feet, CF = Cubic Feet
CDPHE Certification No. 7191
City of
Wheat Ridge
Page 1 of 1
Building Division
EMSL Analytical, Inc.
1010 Yuma Street Denver, CO 80204
Tel/Fax: (303) 740-5700 / (303) 741-1400
4 M http://www.EMSL.com / denverlab@emsl.com
Attention: Jennifer Day
Farmer Environmental Group, LLC
8120 Sheridan Blvd
Suite A306
Westminster, CO 80002
Project: 9830B 1-70 Frontage Road/5435.01
EMSL Order: 222004281
Customer ID: FARM50D
Customer PO:
Project ID:
Phone: (303) 468-8763
Fax:
Received Date: 06/30/2020 10:45 AM
Analysis Date: 07/01/2020
Collected Date:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-931116 Method using Polarized
Light Microscopy
Non -Asbestos
Sample Description Appearance % Fibrous % Non -Fibrous
Asbestos
% Type
A50805 -Vinyl Sheet Tan sheet vinyl Tan 15% Glass 85% Non-fibrous (Other) None Detected
Flooring Fibrous
Homogeneous
222004281-0001
A50805 -Mastic
Tan sheet vinyl
Tan
100% Non-fibrous (Other) None Detected
None Detected
Non -Fibrous
Non -Fibrous
222004281-0001A
Homogeneous
A50805 -Leveler
Tan sheet vinyl
White
10% Ca Carbonate None Detected
grey sheet vinyl
Black
Non -Fibrous
90% Non-fibrous (Other)
222004281-00018
drywall
Homogeneous
20% Non-fibrous (Other)
A50806 -Vinyl Sheet
grey sheet vinyl
Gray 20% Cellulose
70% Non-fibrous (Other) None Detected
Flooring
City Of
Fibrous 10% Glass
12x12 floor tile w/
Gray
100% Non-fibrous (Other)
Homogeneous
Joint compound
222004281-0002
Non -Fibrous
Non gatdRl ge
A50806 -Tan Mastic
grey sheet vinyl
Tan
100% Non-fibrous (Other)
None Detected
drywall
Non -Fibrous
20% Non-fibrous (Other)
222004281-0002A
Homogeneous
A50806 -Black Mastic
grey sheet vinyl
Black
97% Non-fibrous (Other)
3% Chrysotile
drywall
Non -Fibrous
20% Non-fibrous (Other)
222004281-0002e
Homogeneous
City Of
A50807 -Floor Tile
12x12 floor tile w/
Gray
100% Non-fibrous (Other)
None Detected
Joint compound
yellow mastic
Non -Fibrous
Non gatdRl ge
222004281-0003
Non -Fibrous
Homogeneous
222004281-0007
A50807 -Mastic
12x12 floor tile w/
Yellow
100% Non-fibrous (Other)
None Detected
yellow mastic
Non -Fibrous
222004281-0003A
Homogeneous
A50808 -Cove Base
Gray cove base w/
Gray
100% Non-fibrous (Other)
None Detected
tan mastic
Non -Fibrous
222004281-0004
Homogeneous
A50808 -Mastic
Gray cove base w/
Tan
100% Non-fibrous (Other)
None Detected
tan mastic
Non -Fibrous
222004281-0004A
Homogeneous
A50808 -Mud
Gray cove base w/
White
20% Ca Carbonate
None Detected
tan mastic
Non -Fibrous
80% Non-fibrous (Other)
222004281-00048
Homogeneous
A50809 -Texture
Smooth texture on
White
20% Ca Carbonate
None Detected
drywall
Non -Fibrous
80% Non-fibrous (Other)
222004281-0005
Heterogeneous
Inseparable paint/coating layer included in analysis
A50809 -Drywall
Smooth texture on
Gray/Tan 15% Cellulose
65% Gypsum
None Detected
drywall
Fibrous <1% Glass
20% Non-fibrous (Other)
222004281-0005A
Homogeneous
A50810 -Drywall
Smooth texture on
Brown/White 15% Cellulose
65% Gypsum
None Detected
drywall
Non -Fibrous
20% Non-fibrous (Other)
222004281-0006
Heterogeneous
City Of
Inseparable paint/coating layer included in analysis
A50811 -Texture
Joint compound
White
20% Ca Carbonate
Non gatdRl ge
Non -Fibrous
80% Non-fibrous (Other)
222004281-0007
Heterogeneous
Building Division
Initial report from: 07/01/2020 12:01:45
ASB_PLM_0008_0001- 1.78 Printed: 7/1/2020 10:01 AM Pagel of 2
EMSL Analytical, Inc.
Joint compound
EMSL Order: 222004281
2% Non-fibrous (Other) None Detected
Customer ID: FARM50D
1010 Yuma Street Denver, CO 80204
222004281-0007A
Homogeneous
Customer PO:
Tel/Fax: (303) 740-5700 / (303) 741-1400
Joint compound
White
M http://www.EMSL.com / denverlab@emsl.com
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-931116 Method using Polarized
Sample Description
Inseparable paint/coating layer included in analysis
Light Microscopy
Non -Asbestos
Appearance % Fibrous % Non -Fibrous
Asbestos
% Type
A50811 -Tape
Joint compound
Tan 98% Cellulose
2% Non-fibrous (Other) None Detected
Fibrous
222004281-0007A
Homogeneous
A50811 -Joint
Joint compound
White
20% Ca Carbonate None Detected
Compound
Non -Fibrous
80% Non-fibrous (Other)
Homogeneous
222004281-00078
A50812
2x4 ceiling tile
Beige 45% Cellulose
20% Non-fibrous (Other) None Detected
Fibrous 35% Min. Wool
222004281-0008
Homogeneous
Analyst(s)
Amanda Hammer (17)
Mollie Shreck (1)
1 %
Melanie Rech, Laboratory Director
or Other Approved Signatory
EMSL maintains liability limited to cost of analysis. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 "Interim
Method"), but augmented with procedures outlined in the 1993 ("final') version of the method. This report relates only to the samples reported above, and may not be reproduced, except in full, without
written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. All
samples received in acceptable condition unless otherwise noted. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or aCjtVetr of
the federal government. EMSL recommends gravimetric reduction for all non -friable organically bound materials prior to analysis. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Denver, CO NVLAP Lab Code 200828-0 Wheat Ridge
Initial report from: 07/01/2020 12:01:45 Building Division
ASB_PLM_0008_0001- 1.78 Printed: 7/1/2020 10:01 AM Page 2 of 2
OrderID: 222004281
EMSL ANALYTICAL, INC.
Asbestos Chain of Custody
EMSL Order Number (Lab use Only):
2 Z -'-v o L4 Z�p
EMSL ANALYTICAL, INC.
1010 YUMA STREET,
DENVER, CO, 80204
PHONE: (303) 740-5700
FAx: (856) 858-4960
Company: Farmer Environmental Group, LLC
EMSL-Bill to: ® Same ❑ Different
If Bill to is Different note instructions in comments—
Third Party Billing requires written authorization from third party
Street: 8120 Sheridan Blvd., Suite A306
City: Westminster
State/Province: CO
Zi /Postal Code: 80003 Country: US
Report To (Name): Jennifer Davy
Fax #:
Telephone #: 303-468-8763
Email Address: 'ennifer.da farmere .corn
Project Name/Number: 830 t3 j 7D [ ac( rJ 5. O
Please Provide Results: ❑ Fax
® Email Purchase Orde : U.S. State Sam les Taken: CO
Turnaround Time TAT O tions` — Please Check
❑ 3 Hour ❑ 6 Hour
4 Hour ❑ 48 Hour ❑ -2 Hour I ❑ 96 Hour I ❑ 1 Week ❑ 2 Week
'For TEM Air 3 hr through 6 hr, please call ahead to schedule.'There is a premium charge for 3 Hour TEM AHERA or EPA Level 11 TAT. You will he asked to sign
an authorization torte for this service. Analysis corn leted in accordance with EMSL's Terms and Conditions located in the Analyticaf Price Guide.
PCM - Air
❑ NIOSH 7400
❑ w/ OSHA 8hr. TWA
TEM — Air ❑ 4-4.5hr TAT (AHERA only)
❑ AHERA 40 CFR, Part 763
❑ NIOSH 7402
❑ EPA Level II
❑ ISO 10312
TEM- Dust
❑ Microvac - ASTM D 5755
❑ Wipe - ASTM D6480
❑ Carpet Sonication (EPA 600/J-93/167)
PLM - Bulk (reporting limit)
8PLM EPA 600/R-93/116 (<l%)
PLM EPA NOB (<1%)
Point Count
❑ 400 (<0.25%) ❑ 1000 (<0.1%)
Point Count w/Gravimetric
❑ 400 (<0.25%) ❑ 1000 (<0.1%)
❑ NYS 198.1 (friable in NY)
❑ NYS 198.6 NOB (non -friable -NY)
❑ NIOSH 9002 <I%
Soil/Rock[Vermiculite
❑ PLM CARB 435 - A (0.25% sensitivity)
❑ PLM CARB 435 - B (0.1% sensitivity)
❑ TEM CARB 435 - B (0.1 % sensitivity)
❑ TEM CARB 435 - C (0.01% sensitivity)
❑ EPA Protocol (Semi -Quantitative)
❑ EPA Protocol (Quantitative)
TEM - Bulk
❑ TEM EPA NOB
❑ NYS NOB 198.4 (non -friable -NY)
❑ Chatfield SOP
❑ TEM Mass Analysis -EPA 600 sec. 2.5
TEM —Water: EPA 100.2
Fibers >10pm ❑ Waste ❑ Drinking
All Fiber Sizes ❑ Waste ❑ Drinking
Other:
❑ Absense/Presence Microvac
❑ Check For Positive Stop — Clearly Identify Homogenous Group
Samplers Name: Jennifer Day
Samplers Signature:
Sample #
Sample Description
Vol e/A a (Air)
A#( Ik
ate/Time
Sampled
SheeV �t� i
i
I z
lu F .l
2
ULM o
l2 Flour & le ` W�
e(lawfvu�h�
3
Sd3 9 a
�M ire
S
�'�s08►o
r(
s
084nia4
m O6
Client Sample # (a):Total
# of Samples:
Relinquished (Client):
Date: (aI/ �t) @_0 ._Z Time:
Received (Lab):
P'1N Date: Time: LD*
Comments/Special Instr tions:
City of
Wheat Rorig
conmwoo mem-mwstoscoc-m-vnrzmu Page 1 of ges
Paqe 1 Of
Building Division
Site: 9830 W 1-70 Frontage Road, Unit B, Wheat Ridge, CO
Project Number: 5435.01
Farmer Environmental Group, LLC
Data Summary Table
Survey Type (Comprehensive, Limited, Demolition): Limited
Construction Date: 19782006 Areas: Interior
Homogeneous
Application
Material Description
Sample ID
Friable
(F, NF)
Condition
(G, D, SD)
ACBM
Classification
(1-7)
Type (T,S,M)
Approximate
Quantity
Sample Location / Notes
1
Tan Sheet Vin
A50805
F
G
NA
M
50 sf
Back Restroom off kitchen
2
Gray Sheet Vin
A50806
F
G
NA
M
100 sf
kitchen
3
12"x12" Floor Tile
A50807
NF
G
NA
M
75 sf
back room east of kitchen
4
lGray Cove Base wlfan Mastic
A50808
NF
I G
NA
M
lback room west side
5,6
Smooth Texture on Drywall
A50809
F
G
NA
S,M
rece tion desk
5,6
Smooth Texture on Drywall
A50810
F
G
NA
S,M
center hall/work area
7
Joint Compound
A50811
F
G
NA
M
IT room
8
2'x4'Ceiling Tile
A50812
F
G
NA
M
4200 sf
reception desk
Inspector Name: Jennifer Day
T = TSI, S = Surfacing, M = Miscellaneous, SF = Square Feet, LF = Linear Feet, CF = Cubic Feet
CDPHE Certification No. 7191
City of
Wheat Ridge
Page 1 of 1
Building Division
EMSL Analytical, Inc.
1010 Yuma Street Denver, CO 80204
Tel/Fax: (303) 740-5700 / (303) 741-1400
4 M http://www.EMSL.com / denverlab@emsl.com
Attention: Jennifer Day
Farmer Environmental Group, LLC
8120 Sheridan Blvd
Suite A306
Westminster, CO 80002
Project: 9830 CW 1-70 Frontage Rd/5435.01
EMSL Order: 222004280
Customer ID: FARM50D
Customer PO:
Project ID:
Phone: (303) 468-8763
Fax:
Received Date: 06/30/2020 10:30 AM
Analysis Date: 07/01/2020
Collected Date:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-931116 Method using Polarized
Light Microscopy
Non -Asbestos
Sample Description Appearance % Fibrous % Non -Fibrous
Asbestos
% Type
A50786
Black mirror mastic
Black
100% Non-fibrous (Other)
None Detected
Non -Fibrous
222004280-0001
Homogeneous
A50787
Black mirror mastic
Black
100% Non-fibrous (Other)
None Detected
Non -Fibrous
222004280-0002
Homogeneous
A50788
Yellow mirror mastic
Tan
100% Non-fibrous (Other)
None Detected
Non -Fibrous
222004280-0003
Homogeneous
A50789 -Mastic
Yellow mirror mastic
Tan
100% Non-fibrous (Other)
None Detected
Non -Fibrous
222004280-0004
Homogeneous
A50789 -Mud
Yellow mirror mastic
White
20% Ca Carbonate
None Detected
Non -Fibrous
80% Non-fibrous (Other)
222004280-0004A
Homogeneous
A50790
Yellow carpet glue
Tan
100% Non-fibrous (Other)
None Detected
Non -Fibrous
222004280-0005
Homogeneous
A50791
Yellow carpet glue
Tan
100% Non-fibrous (Other)
None Detected
Non -Fibrous
222004280-0006
Homogeneous
A50792
Tan cove base mastic
Beige
4% Fibrous (Other)
96% Non-fibrous (Other)
None Detected
Non -Fibrous
222004280-0007
Homogeneous
A50793 -Mastic
Tan cove base mastic
Tan
3% Fibrous (Other)
97% Non-fibrous (Other)
None Detected
Non -Fibrous
222004280-0008
Homogeneous
A50793 -Mud
Tan cove base mastic
White
20% Ca Carbonate
None Detected
Non -Fibrous
80% Non-fibrous (Other)
222004280-0008A
Homogeneous
A50794 -Floor Tile
12x12 floor tile w/
White
100% Non-fibrous (Other)
None Detected
yellow mastic
Non -Fibrous
222004280-0009
Homogeneous
A50794 -Mastic
12x12 floor tile w/
Tan
100% Non-fibrous (Other)
None Detected
yellow mastic
Non -Fibrous
222004280-0009A
Homogeneous
A50795 -Floor Tile
12x12 floor tile w/
Gray
100% Non-fibrous (Other)
None Detected
yellow mastic
Non -Fibrous
222004280-0010
Homogeneous
A50795 -Mastic
12x12 floor tile w/
Tan
100% Non-fibrous (Other)
None Detected
yellow mastic
Non -Fibrous
222004280-OOIOA
Homogeneous
A50796
2x4 ceiling tile
White/Beige
45% Cellulose
20% Non-fibrous (Other)
None Detected
Fibrous
35% Min. Wool
222004280-0011
Homogeneous
A50797
2x4 ceiling tile
Beige
45% Cellulose
20% Non-fibrous (Other)
None Detected
City Of
Non -Fibrous
35% Min. Wool
222004280-0012
Homogeneous
Initial report from: 07/01/2020 13:52:30 Building Divisi0
ASB_PLM_0008_0001- 1.78 Printed: 7/1/2020 11:52 AM Page 1 of 3
EMSL Analytical, Inc. EMSL Order: 222004280
Customer ID: FARM50D
1010 Yuma Street Denver, CO 80204
Customer PO:
Tel/Fax: (303) 740-5700 / (303) 741-1400
M http://www.EMSL.com / denverlab@emsl.com Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-931116 Method using Polarized
Light Microscopy
A50801 -Drywall Smooth texture on
Tan/White 15% Cellulose
Non -Asbestos
Asbestos
Sample Description
Appearance
% Fibrous % Non -Fibrous
% Type
A50798 -Texture Joint compound
White
20% Ca Carbonate
None Detected
Compound drywall/j.c.
Non -Fibrous
80% Non-fibrous (Other)
222004280-0013
Heterogeneous
222004280-0017
Inseparable paint coating layer included in analysis
Inseparable paint/coating layer included in analysis
A50798 -Tape Joint compound
Beige
98% Cellulose 2% Non-fibrous (Other)
None Detected
Fibrous
222004280-0013A
Homogeneous
A50798 -Joint Joint compound
White
15% Ca Carbonate
None Detected
Compound
Non -Fibrous
85% Non-fibrous (Other)
Homogeneous
222004280-00138
A50799 -Joint Joint compound
White
20% Ca Carbonate
None Detected
Compound
Non -Fibrous
80% Non-fibrous (Other)
Heterogeneous
222004280-0014
Inseparable paint coating layer included in analysis
A50800 -Texture 1 Smooth texture on
White
20% Ca Carbonate
None Detected
drywall
Non -Fibrous
80% Non-fibrous (Other)
222004280-0015
Heterogeneous
Inseparable paint/coating layer included in analysis
A50800 -Texture 2 Smooth texture on
White
15% Ca Carbonate
None Detected
drywall
Non -Fibrous
85% Non-fibrous (Other)
222004280-0015A
Heterogeneous
Inseparable paint/coating layer included in analysis
A50800 -Drywall Smooth texture on
Brown/White
15% Cellulose 65% Gypsum
None Detected
drywall
Fibrous
20% Non-fibrous (Other)
222004280-0015e
Homogeneous
A50801 -Texture Smooth texture on
White
20% Ca Carbonate
None Detected
drywall
Non -Fibrous
80% Non-fibrous (Other)
222004280-0016
Heterogeneous
Inseparable paint/coating layer included in analysis
A50801 -Drywall Smooth texture on
Tan/White 15% Cellulose
65% Gypsum None Detected
drywall
Fibrous
20% Non-fibrous (Other)
222004280-0016A
Homogeneous
A50802 -Joint Smooth texture on
White
20% Ca Carbonate None Detected
Compound drywall/j.c.
Non -Fibrous
80% Non-fibrous (Other)
Heterogeneous
222004280-0017
Inseparable paint/coating layer included in analysis
A50802 -Drywall Smooth texture on
Brown/White 15% Cellulose
65% Gypsum None Detected
drywall/j.c.
Fibrous
20% Non-fibrous (Other)
222004280-0017A
Homogeneous
A50803 -Joint Smooth texture on
White
20% Ca Carbonate None Detected
Compound drywall/j.c.
Non -Fibrous
80% Non-fibrous (Other)
Heterogeneous
222004280-0018
Inseparable paint/coating layer included in analysis
A50803 -Drywall Smooth texture on Brown/White 15% Cellulose 65% Gypsum None Detected
drywall/j.c. Fibrous 20% Non-fibrous (Other)
222004280-0018A Homogeneous
A50804 -Texture Smooth texture on White 100% Non-fibrous (Other) None Detected
drywall/j.c. Non -Fibrous
222004280-0019 Heterogeneous
Inseparable paint/coating layer included in analysis
A50804 -Drywall Smooth texture on Tan/White 15% Cellulose 65% Gypsum None Detected
drywall/j.c. Fibrous 20% Non-fibrous (Other)
222004280-0019A Homogeneous
City of
Initial report from: 07/01/2020 13:52:30 Wheat Ridge
ASB_PLM_0008_0001- 1.78 Printed: 7/1/2020 11:52 AM Building 6iVrS2_Q13
EMSL Analytical, Inc.
1010 Yuma Street Denver, CO 80204
Tel/Fax: (303) 740-5700 / (303) 741-1400
4 sM http://www.EMSL.com / denverlab@emsl.com
Analyst(s)
Amanda Hammer (14)
Mollie Shreck (17)
EMSL Order: 222004280
Customer ID: FARM50D
Customer PO:
Project ID:
1 %
Melanie Rech, Laboratory Director
or Other Approved Signatory
EMSL maintains liability limited to cost of analysis. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 "Interim
Method"), but augmented with procedures outlined in the 1993 ("final') version of the method. This report relates only to the samples reported above, and may not be reproduced, except in full, without
written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. All
samples received in acceptable condition unless otherwise noted. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of
the federal government. EMSL recommends gravimetric reduction for all non -friable organically bound materials prior to analysis. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Denver, CO NVLAP Lab Code 200828-0 City of
Initial report from: 07/01/2020 13:52:30
ASB_PLM_0008_0001- 1.78 Printed: 7/1/2020 11:52 AM BuildiMpty" i9n
: 222004280
*Asbestos Chain of Custody EMSLAUMAS R INC.
EMSL Order Number (Lab use Only): 1010 TREET,
DENVER, C Sp,802042 .
5L.NC. iq PHONE: (303) 740-5700
FAx: (856) 858-4960
itional Pages of the Chain of Custody are only necessary if needed for additional sample information
-FU-,,�,a
Page �f, pages
Paqe 2 Of
City of
Wheat Ridge
Building Division
Sam le #
Sample Description
Volume/Area (Air)
HA # Bulk
Date/Time
led
S�1
1� A 12 )oof i-; If, W e \lou M.aoti;C-
2Sam
(Q 1 �l-DhO2li
C e 1 l I 1-<
7
A 5b-lgl
it
I
ASb1ok$
oink Corn oo�G�
I
Sb sob
tvLOOAI(n 0
ID
ASb8c)
•I c.
$ Cloo
1�
I
Al sogoy
CI I o
`Comments/Special
Instructions:
-FU-,,�,a
Page �f, pages
Paqe 2 Of
City of
Wheat Ridge
Building Division
APPENDIX B
BULK SAMPLE LOCATION AND ACM LOCATION DRAWING
CXv a
Wheat Ridge
Bulldi� Division
A5080
A50810
A50812
A50809
9830 W. 1-70 Frontage Road
Wheat Ridge, Colorado
Asbestos Sample Locations Map
Jun on ?non
- Black Mastic Under Sheet Vinyl
PREPLANNING SURVEY -
NOT FOR RENOVATION
RENOVATION INSPECTION
99
34
B
7792
1795
A50786
A50789
50804
\50787
A50788
Z
City of
Wheat Ridge
Building Division
APP=IH
PHOTOGRAPHIC DOCUMENTATION
Clry of
Wheat Ridge
Bulldi� Division
ASBESTOS -CONTAINING BUILDING MATERIALS INSPECTION
9830 W. I-70 FRONTAGE ROAD, UNIT C, WHEAT RIDGE, COLORADO
Photo 1: Subject Site: Front Room Suite C
Photo 3: HA 2, Yellow Mirror Mastic
Photo 5: HA 4, Tan Cove Base Mastic
Farmer Project No. 5435.01 1
Photo 2: HA 1, Black Mirror Mastic
Photo 4: HA 3, Yellow Carpet Glue
Photo 6: HA 5 and 6, 12" x 12" White Floor Tile with Yellow
Mastic
City of
Wheat Ridge
Farmer Environmental Group, LlikOlding Division
ASBESTOS -CONTAINING BUILDING MATERIALS INSPECTION
9830 W. I-70 FRONTAGE ROAD, UNIT C, WHEAT RIDGE, COLORADO
Photo 7: HA 7, 2' x4' Lay -In Ceiling Tile
Photo 8: HA 8, 9, and 10; Smooth Texture, Joint Compound
on Drywall
City of
Wheat Ridge
Building Division
Farmer Project No. 5435.01 2 Farmer Environmental Group, LLC
APPENDIX IV
LICENSES AND CERTIFICATIONS
Clry of
Wheat Ridge
Bulldi� Division
V)
Q
X
w
C
O
cu
a�
C
bA
i C
~ O
U
2 �
U z
.H
a �U-)
Q 00 E O
0 Q
u Z
L - 0 ip
Ln Ln>
n > o
a a
i�: o V) 0.
Ln Q
N Y Y
1 C Y
0
0
0
E
0
o�
Of
LU
2 MIn
CD 00
to
all
.�2 W
LO
o
U
W/
0
Q
W
0zV)
�=
4-J
- o
z
�
U
E
a
C
V
Q
)
C
to
C
�..
o
m
4-
oQ
N
_
N
0 O
C
U c0
O
�
t!)
V)
W
N
U
o
X
R O
-1
w
�
�
O
c
Q(3)4
Z`
4-
O
(,Dv
O
N
Q 06
C
O
C
�
O
4--J
0
0
o
v
�
C
U
o
W
�
O
v
Z
o
E
U
o
z
Q
o
--
U
iJ
V)
C
�
•ZI
keg �
Y
Building Division��'.
w
0
z
- o
O_
D
Z
E
a
L'oLon
Q
)
L= CL
O1.1
a
N
o
�
w
oQ
N
_
N
C)
U c0
O
O
V)
0
LU U
N
N
o
R O
-1
�
�
U
Q
Q 06
U
•ZI
keg �
Y
Building Division��'.
w
a`,
O
O_
D
Z
E
a
L'oLon
Q
)
O1.1
a
N
C4
C
Z).E
U
�
w
CLv
U
C)
o
ti
Ln
0
LU U
u
•ZI
keg �
Y
Building Division��'.
City of Wheat Ridge
F,t
Residential Plumbing PERMIT - 201803096
PERMIT NO: 201803096 ISSUED:
JOB ADDRESS: 9830 W I-70 Frontage Rd S EXPIRES:
JOB DESCRIPTION: Gas line pressure test
*** CONTACTS ***
OWNER (303)467-8732 SCL HEALTHER
SUB (303)779-0781 Fred Haynes
11/29/2018
11/29/2019
140248 Haynes Mechanical Systems
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 550 / Medical Office BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 2,000.00
FEES
Total Valuation 0.00
Use Tax 42.00
Permit Fee 77.50
** TOTAL ** 119.50
*** COMMENTS ***
*** CONDITIONS ***
All work shall comply 2012 International Codes, 2017 NEC (if applicable), and ordinances
adopted by the City of Wheat Ridge. Work is subject to field inspections.
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all appii-ablemumcipa'codepOic
by the leal owner ofthepropertyanmauthorzed toobtihisthispermit. I furtherattestthat I am lllyauthorized toinclude alperfOrir}d and that allwork tobe permed is disclosed in this document and/or its' accompanying approved plans and specifications.
Signat re of x OW DR or CONTRA TOR (Circle one) Date
I. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the originalpermit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Budding Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of ermit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applicableeed;e or any ordi ce or regulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of Chief Building Official Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
` City of
W heat I�clgc
COMMUNITY DEVELOPMENT
Building & Inspection Services
7500 W. 291' Ave., Wheat Ridge, CO 80033
Office: 303-235-2855 * Fax: 303-237-8929
Inspection Line: 303-234-5933
Email: permits ccDci.wheatridge.co.us
FOR OFFICE USE ONLY
Date:N/
oG r I
Plan/Permit # \ I�
Plan Review Fee:
Building Permit Application
*** Complete all applicable highlighted areas on both sides of this form.
Incomplete applications may not be processed. ***
Property Address: vl
0 V� 110
IM
Property Owner (please print): t k1b Phone: '50-J -'tul • C613 -L
Property Owner Email: dares`- Sryli " �S`G1n�l�'Nn .Ori
Tenant Name (Commercial Projects Only) S I&ed1 k'4r)
Property Owner Mailing Address: (if different than property address)
Address:
City, State, Zip:
Arch itect/Eng 1 neer E-mail:
Contractor Name:
City of Wheat Ridge License #:
Phone:
Phone:
Contractor E-mail Address: �mor r\SorgeyAa4r s nnechani o,\ • Cevv�
For Plan Review Questions & Comments (please print):
CONTACT NAME (please print):brl'�e- t1(�D R-IR-tSO►'1 Phone: t �-l�• �� . �� 4
CONTACT EMAIL(p/ease print): �kY1bYr�Sohe�Ol��eS MeC XCkY1'kC4- Ulnn
Sub Contractors (Must provide Wheat Ridge License No & Signed Subcontractor Authorization form):
Electrical: Plumbing: Mechanical:
W.R. City License # W.R. City License # W.R. City License #
Other City Licensed Sub: Other City Licensed Sub:
City License # City License #
Complete all highlighted fields, if applicable.
COMMERCIAL
❑ RESIDENTIAL
Provide description of work: For ALL projects, provide a detailed description of work to be
performed, including current use of areas, proposed uses, square footage, existing condition and
proposed new condition, appliance size and efficiency, type and amount of materials to be used, etc.
Sq. FULF
G,2S Wvne 9MSc uve +St
BTUs
Gallons
Amps Squares For Solar: KW # of Panels Requires Structural
For Commercial Projects Only: Occupancy Type: Construction Type:
Occupancy Load: Square Footage:
Project Value: (Contract value or the cost of all materials and labor included in the entire project)
2, 000
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or
regulations of the City of Wheat Ridge or covenants, easements or restrictions of record: that all measurements shown and allegations made are
accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance
with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner
or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any
entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the
truthfulness of the information proya'ded-cal the application.
CIRCLE ONE: (OWNER) TRACT R) or (AUTHORIZED REPRESENTATIVE) of (OWNER)
(CONTRACTOR)
Signature (first and last,-n�amme)_: ^ DATE: l 1 L
Printed Name: �t`�� ► �1( M b _ S
DEPARTMENT USE ONLY
ZONING COMMMENTS: OCCUPANCY CLASSIFICATION:
CONSTRUCTION TYPE:
Reviewer:
BUILDING DEPARTMENT COMMENTS:
Reviewer:
PUBLIC WORKS COMMENTS:
Reviewer:
Building Division Valuation:
I* � 4 i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: C! A
Job Address:
Permit Number:
❑ No one available for inspection: Time Ll PI AM/PM
Re -Inspection required: YesN)for
When corrections have been made, c�11 re -inspection at 303-234-5933
Date: �l�' `%� Inspector:
DO NOT REMOVE THIS NOTICE
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: zu /%/ SI
Job Address: 1 G? a��fd Q 3� cfh
Permit Number: 2.217 q156
❑ No one available for inspection: Time /U. /.:: �A PM
Re -Inspection required: Yep` No
When corrections have been made, call for re -inspection at 303-234-5933
Date: -6 Inspector: Lo)
DO NOT REMOVE THIS NOTICE
City of Wheat Ridge
Commercial Sign PERMIT - 201709156
PERMIT NO: 201709156 ISSUED: 12/22/2017
JOB ADDRESS: 9830 W I-70 Frontage RD S EXPIRES: 12/22/2018
JOB DESCRIPTION: Commercial Sign re -branding the name of the clinic. New commercial wall
signage on the storefront elevation. Remove existing letters reading
Occupational Medicine Physical Therapy and installing letters reading SCL
Health Medical Group on a backer panel. We will tie into existing
electrical in place.
Changing out the door vinyl graphics with updated brand and hours of
operation.
Changing out the existing plastic tenant panels with new plastic faces
reading SCL Health Medical Group on existing multi -tenant pylon sign.
Storefront wall sign = 55.56sgft Tenant panels 80sgft Door vinyl 7sgft.
*** CONTACTS ***
OWNER (303)534-5005 LAG B OMER PARTNERSHIP
SUB (303)937-1915 James Kunsman 170658 K Team LLC
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 330 / General Retail BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 12,500.00
FEES
Total Valuation 0.00
Plan Review Fee 163.70
Use Tax 262.50
Permit Fee 251.85
** TOTAL ** 678.05
*** COMMENTS ***
*** CONDITIONS ***
Approved per plans and red -line notes on plans. Must comply with 2012 IBC, 2014 NEC and all
applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections.
**Prior to final inspection approval - As-builts are required before approval of the
Building Final Inspection and Certificate of Occupancy can be issued.All work shall comply
2012 International Codes, 2014 NEC (if applicable), and ordinances adopted by the City of
Wheat Ridge. Work is subject to field inspections.
A m City of Wheat Ridge
L
Commercial Sign PERMIT - 201709156
PERMIT NO: 201709156 ISSUED: 12/22/2017
JOB ADDRESS: 9830 W I-70 Frontage RD S EXPIRES: 12/22/2018
JOB DESCRIPTION: Commercial Sign re -branding the name of the clinic. New commercial wall
signage on the storefront elevation. Remove existing letters reading
Occupational Medicine Physical Therapy and installing letters reading SCL
Health Medical Group on a backer panel. We will tie into existing
electrical in place.
Changing out the door vinyl graphics with updated brand and hours of
operation.
Changing out the existing plastic tenant panels with new plastic faces
reading SCL Health Medical Group on existing multi -tenant pylon sign.
Storefront wall sign = 55.56sgft Tenant panels 80sgft Door vinyl 7sgft.
I, by my si ture, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable �Iding codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the le ow er of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this pernii I f rther attest that I am legally authorized to include alI entities named within this document as parties to the work to be
pertorme an th t all work to be performed is disclosed in this documen and/or'its' accompanying approved plans and specifications.
Signa�'ure of OWNER or CONTRACTOR (Circle one) ate
1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, po plans
and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the originalpermit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4, No work of any manner shall be performed that shall results in a changeof the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to f any
inspection.
w�
Signature of C uimg Official' "`"`�` Date
REQUESTS MUST BE MADE BY 11:59PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
City of
/ W heat idge
COMMUNITY DEVELOPMENT
FOR OFFICE USE ONLY
Date:
�I -/7
Planmennit # D�e 17 6 � <
Building & Inspection Services Division
7500 W. 29" Ave., Wheat Ridge, CO 80033 Plan Review Fee: � t
Office: 303-235-2855 x Fax: 303-237-8929 �a � I 711)
Inspection Line: 303-234-5933
Building Permit Application
Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed.
Property Address: 9830 S. 1-70 Frontage Rd. Wheat Ridge, CO 80033
LAG B OMER PARTNERSHIP
Property Owner (please print): LAG B OMER LIMITED LIABILITY COMPANY Phone: 303.534.5005
Property Owner Email: nthomas@shamesmakovsky.com Nina Thomas 303.565.3013 direct
Mailing Address: (if different than property address)
Address: 1400 Glenarm Place, Suite 100
City, State, Zip: Denver, CO 80202
Architect/Engineer: Gensler (Harry Spetnagel)
Architect/Engineer E-mail: harry_spetnagel@gensler.com Phone: 303.595.8585 main 303.893.7157 direct
Contractor: K -Team Capital (dba Arapahoe Sign Arts) Contact: Jennifer Copeland
Contractors City License #: 170658
Phone: 303.937.1915 main 303.801.8987 direct
Contractor E-mail Address: jennifer.copeland@arapahoesignarts.com
Sub Contractors: N/A
Electrical: Plumbing:
W.R. City License # W.R. City License #
Other City Licensed Sub:
City License #
Mechanical:
W.R. City License #
Other City Licensed Sub:
City License #
Complete all information on BOTH sides of this form
Description of work: (Check all that apply)
VNEW COMMERCIAL STRUCTURE ❑ ELECTRICAL SERVICE UPGRADE
❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING
❑ COMMERCIAL ADDITION ❑ RESIDENTIAL ROOFING
❑ RESDENTIAL ADDITION ❑ WINDOW REPLACEMENT
❑ COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT
ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
OTHER (Describe) NEW COMMERCIAL SIGNAGE
(For ALL projects, please provide a detailed description of work to be performed, including current use of areas,
proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and
amount of materials to be used, etc.)
WE ARE RE -BRANDING THE NAME OF THE CLINIC. NEW COMMERCIAL WALL SIGNAGE ON THE STOREFRONT ELEVATION.
REMOVE EXISTING LETTERS READING "OCCUPATIONAL MEDICINE PHYSICAL THERAPY" AND REPLACING WITH NEW
LETTERS READING "(LOGO) SCL HEALTH MEDICAL GROUP" ON A BACKER PANEL. WE WILL TIE INTO EXISTING
ELECTRICAL IN PLACE.
CHANGING OUT THE DOOR VINYL GRAPHICS WITH UPDATED BRAND & HOURS OF OPERATION.
CHANGING OUT THE EXISTING PLASTIC TENANT PANELS WITH NEW PLASTIC FACES READING "SCL HEALTH MEDICAL GROUP"
ON EXISTING MULTI -TENANT PYLON SIGN.
STOREFRONT WALL SIGN 55.56 SQ. FT
Sq. Ft./LF DOOR VINYL 7 SQ. FT. Btu's
Amps
Squares
TENANT PANELS 80 SQ. FT.
Gallons
Other
Project Value: (Contract value or the cost of all materials and labor included in the entire project)
$ 12,500.00
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances. rules or
regulations of the City of Wheat Ridge or covenants. easements or restrictions of record: that all measurements shown and allegations made are
accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance
with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application: that I am the legal owner
or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any
entity included on this application to list that entity on this application.
CIRCLE ONE: (OWNER) (CONTRACTOR) r (AUTHORIZED FIPRESENTATIVE) of (OWNER) (CONTRACTOR)
PRINT NAME: Jennifer Copeland SIGNATURE: DATE: 11/7/17
Sr- PM for Arapahoe Sign Art�
DEPARTMENT USE ONLY
ZONING COMMMENTS: IFV�Qd. C''l., OCCUPANCY CLASSIFICATION
Reviewer:
BUILDING DEPARTMENT CQMMENTS
Reviewer
PUBLIC WORKS COMMENTS
Reviewer
PROOF OF SUBMISSION FORMS
Fire Department ❑ Received ❑ Not Required
Water District ❑ Received ❑ Not Required
Sanitation District ❑ Received ❑ Not Required Building Division Valuation: $
PLAN CHECK •
Wall Sign Calculation Sheet
You must complete this sheet and include it in the submittal package for
any new wall signs. You will also need to create a site plan and a detail
sheet of the signage.
Project Address: 9830 S. 1-70 Frontage Rd. Contractor: K Team Capital (dba Arapahoe Sign Arts)
Wheat Ridge, CO 80033
You are allowed 1 square foot of signage for every 1 linear foot of wall to which you are
attaching a sign.
All wall signs must be adjacent to a street or major interior drive.
Step 1: Measure the length of the wall(s) where you are attaching the sign:
Wall 1 - 98'-0" feet Wall 2 - feet Wall 3 - feet
Step 2: The length of the wall is the allowable square footage for the wall sign.
Wall 1 allowable signage- 98 sq. ft. square feet
Wall 2 allowable signage- square feet
Wall 3 allowable signage- square feet
Site Plan
VHEgT Freestanding Sign Calculation Sheet
m You must complete this sheet and include it in the submittal package for
any new freestanding signs. You will also need to create a site plan
and a detail sheet of the signage.
Project Address: 9830 S. 1-70 Frontage Rd. Contractor: K Team Capital (dba Arapahoe Sign Arts)
Wheat Ridge, CO 80033
You are allowed 1 freestanding sign for every street right-of-way adjacent to your
property. The allowable sign size is related to building size.
Step 1: Determine the square footage of the building:
Building size (in square feet):
(This will be inserted in the formula below)
Step 2: Complete the appropriate allowable signage formula:
If the building is 0 — 1,500 square feet in size, you are allowed a 35 square foot sign.
If the building is 1,501 — 5,000 square feet in size, complete the following:
-1,501 = _ 50= + 35=
Building size Allowed sign size
If the building is 5,001 — 50,000 square feet in size, complete the following:
- 5,001 = _ 500 = + 100 =
Building size Allowed sign size
If the building is 50,000 + square feet in size, complete the following:
- 50,001 = + 1,000 = 7+190
=
Building size Allowed sign size
Th "allowed sign size" may be placed on each side of the freestanding sign.
Check here if the sign is existing and you are replacing a cabinet or face with the same size
cabinet or face.
Continued on back
The sign must meet a setback from the street right-of-way.
If the sign is less than 7 feet in height, the sign must be setback 5 feet.
If the sign is between 7 feet and 15 feet the sign must be setback 10 feet.
For most freestanding signs, the maximum height is 15 feet. For properties within '/ mile of the
interstate, freestanding signs may be 50 feet tall. These signs must be setback at least 30 feet from
the street right-of-way.
Step 3: Determine the height of the new sign:
The new proposed freestanding sign will be
feet tall.
Step 4: Determine the setback from the street right-of-way:
The new proposed sign will be setback
feet from the street right-of-way.
All freestanding signs must adhere to the sight distance triangle requirements as listed in Section
26-603 of the Code of Laws.
You must include a site plan which details the location of the freestanding sign, building and drive
areas. Show all new and existing signage (include the square footage and height of all existing
signs). Please include a detail of the proposed sign, including the overall square footage and height,
as well as any electrical and structural details which may be pertinent.
INSPECTION RECORD
Inspection online form: http://www.cl.wheatridge.co.us/inspection
Cancellations must be submitted via the online form before 8 a.m. the day of the inspection
Inspections will not be performed unless this card is posted on the project site
Request an inspection before MIDNIGHT (11:59 PM) to receive an inspection the following business day
PERMIT)` C� � � ADDRESS: %,4t -- JOB CODE:
Foundation Inspections
Date
Inspector
Initials
Comments
102 Caissons / Piers
103 Footing / P.E. Letter
104 Foundation Setback Cert.
105 Stem Walls
106 Foundation wall Insulation
Do Not Pour Concrete Prior To Approval Of The Above Inspections
Underground / Slab Inspections
Date
Inspector
Initials
Comments
201 Electrical / Cable/ Conduit
202 Sewer Underground Int.
203 Sewer Underground Ext.
204 Plumbing Underground Int.
205 Plumbing Underground Ext.
206 Water Underground
Do Not Cover Underground or Below / In -Slab Work Prior To Approval Of The Above Inspections
Rough Inspection
Date
Inspector
Initials
Comments
301 Rough Framing
302 Wall Sheathing
303 Roof Sheathing
304 Sheer Inspection
305 Insulation
306 Mid -Roof
307 Metal / Lath / Stucco
308 Rough Electrical Residential
309 Rough Electrical Commercial
310 Electrical Meter Residential
311 Electrical Meter Commercial
312 Temp. Const. Meter
313 Rough Plumbing Residential
314 Rough Plumbing Commercial
315 Shower Pan
SEE OVER FOR ADDITIONAL INSPECTIONS
PERMIT:' _ �� ADDRESS: 9e-' j -D �2J`/7G JOP CODE:(- iii ( //t
Rough Inspection (continued)
Date
Inspector
Initials
Comments
316 Rough Mechanical Residential
—
317 Rough Mechanical Commercial
318 Boiler / Furnace21.
319 Hot water tank
Vf
320 Drywall screw and Nail
.;%
321 Moisture board / shower walls
322 Rough Grading
l ,-
323 Miscellaneous
409 Final Roof
Final Inspections
Date
Inspector
Initials
Comments
401 Gasline
402 Gas Meter Release
403 Final Electrical Residential
404 Final Electrical Commercial
Vf
405 Final Mechanical Residential
406 Final Mechanical Commercial
407 Final Plumbing Residential
408 Final Plumbing Commercial
409 Final Roof
410 Final Window/Door
411 Landscape/Park/Planning*
Inspections from these entities shall be requested
one week in advance.
*For landscaping and parking inspections please
call 303-235-2846
**For ROW and drainage inspections please call
303-235-2861
***For fire inspections please contact the Fire
Protection District for your project.
412 Row/Drainage/Public Works**
413 Flood plain Inspection**
414 Fire Insp. / Fire Protection***
415 Public Works Final**
416 Storm Water Mgmt.**
417 Zoning Final Inspection*
418 Building Final Inspection
Note: All items must be completed and approved by Planning, Public Works, Fire and Building
before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not
constitute authorization of occupancy.
For Low Voltage permits please be sure that rough inspections are completed by the Fire District and
Electrical low voltage by the Building Division.
s
City of Wheat Ridge
Commercial Addition PERMIT - 201500881
PERMIT NO:
201500881
ISSUED: 07/06/2015
JOB
ADDRESS:
9830 W I-70 Frontage RD S
EXPIRES: 07/05/2016
JOB
DESCRIPTION:
Refinish existing structure.
Remodel of existing medical space. Demo of
casework, floors, plumbing,
electrical. Finish new space with new
partitions, casework, flooring,
HVAC, plumbing and electrical.
***
CONTACTS ***
OWNER (303)534-5005
SHAMES MAKOVSKY
GC
(303)699-9000
Dick Saunders
018361 Saunders Construction, Inc.
SUB
(303)288-4546
Apollo Mechanical
150125 Apollo Mechanical Contractors
SUB
(303)288-4546
Apollo Mechanical
150125 Apollo Mechanical Contractors
SUB
(303)286-8000
Richard Swartz
018567 Sturgeon Electric Co.
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: /
SUBDIVISION CODE: 121 / BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 95,760.00
FEES
Total Valuation 0.00
Plan Review Fee 714.90
Use Tax 1,723.68
Permit Fee 1,099.85
** TOTAL ** 3,538.43
*** COMMENTS ***
*** CONDITIONS ***
PG: Approved per plans and red -line notes on plans. Must comply with 2012 IBC, 2014 NEC and
all applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections.
Mi.
i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type:�L
Job Address:�U� li cChr 5
Permit Number: 0027.5cf/
❑ No one available for inspection: Time C %-'fA /PM
Re -Inspection required: Ye No>
When corrections have been made, call for re -inspection at 303-234-5933
Date: > ' 17 Gy ' I Inspector:
DO NOT REMOVE THIS NOTICE
1* � 4 i CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234-5933 Inspection line
(303) 235-2855 Office - (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: J -F
Job Address: ,M/1?0 w -T-70
Permit Number: ,6/%09' �,o %
❑ No one available for inspection: Time_ AM/PM
Re -Inspection required: Yes o'
When corrections have been made, ca for ire -inspection at 303-234-5933
Date: -3/)-7// 9 Inspector: YP /in / �ec
DO NOT REMOVE THIS NOTICE
City of Wheat Ridge
a- Comm. Tenant Finish PERMIT - 201709581
PERMIT NO: 201709581 ISSUED: 02/06/2018
JOB ADDRESS: 9830 W I-70 Frontage RD S EXPIRES: 02/06/2019
JOB DESCRIPTION: Tenant improvement 225 sgft, X-ray equipment being changed out, includes
electrical.
*** CONTACTS ***
OWNER (303)689-8889 SCL HEALTH SYSTEMS
SUB (303)699-9000 Richard Saunders 018361 Saunders Construction, Inc.
SUB (303)286-8000 Diana Lynch - License Holder 018567 Sturgeon Electric Co.
*** PARCEL INFO ***
ZONE CODE: UA / Unassigned USE: UA / Unassigned
SUBDIVISION CODE: 330 / General Retail BLOCK/LOT#: 0 /
*** FEE SUMMARY *** ESTIMATED PROJECT VALUATION: 38,225.00
FEES
Total Valuation 0.00
Plan Review Fee 391.98
Use Tax 802.73
Permit Fee 603.05
** TOTAL ** 1,797.76
*** COMMENTS ***
*** CONDITIONS ***
Approved per plans and red -line notes on plans. Must comply with 2012 IBC, 2014 NEC and all
applicable City of Wheat Ridge Municipal Codes. Work is subject to field inspections.
**Prior to final inspection approval - As-builts are required before approval of the
Building Final Inspection and Certificate of Occupancy can be issued.AWork must comply with
the 2014 NEC, 2012 IBC and other applicable codes and ordinances. Work is ubject to field
inspection.11 roughs to be done at Framing Inspection.
City of Wheat Ridge
Comm. Tenant Finish PERMIT - 201709581
PERMIT NO: 201709581 ISSUED: 02/06/2018
JOB ADDRESS: 9830 W I-70 Frontage RD S EXPIRES: 02/06/2019
JOB DESCRIPTION: Tenant improvement 225 sgft, X-ray equipment being changed out, includes
electrical.
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications=
applicable building codes, and all applicable municippal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am thorized to obtain this permit and perform the work described and approved in conjunction with
this permit. I further attest that I a uthorized to include all entities named within this document as parties to the work to be
pertormed�u�#-tha per ed is jr�eed in this document and/or its' accompayying approved plans and specifications.
Signature of OWNE1 or CONTRACTOR (Circle one) Date '
1. This permit was issued based on the information provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and maybe subject to a fee equal to one-half of the originalpermit fee.
3. If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4. No work of any manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applicable code or any ordmanc or regulation of this jurisdiction. Approval of work is subject to field inspection.
Signature of ' 'n Qf ici Date
REQUESTS blUgr BE MADE BY 11:55PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
City of
�
/ Wheat N�ge
COMMUNl1Y DEVELOPMENT
Building & Inspection Services Division
7500 W. 291' Ave., Wheat Ridge, CO 80033
Office: 303-235-2855 * Fax: 303-237-8929
Inspection Line: 303-234-5933
Email: permits ci.wheatridae.co.us
FOR OFFICE USE ONLY
Date: %/ Iq /_7
Plan/Permit#
Plan Review Fee: ✓
Building Permit Application
*** Please complete all highlighted areas on both sides of this form. Incomplete applications may not be processed. ***
Property Address:I n L��. _L fit; fi=n --Jkc f-� G4 a
Property Owner (please print): `aC-L 0 ,qL- r -t `>`-t `�) rL'rc-i Phone: 17
Property Owner Email: -J V`;T, ,moi - � j,= r �- c u S u1 ��r • c c
Mailing Address: (if different than property address)
Address:
City, State, Zip:
Arch itect/Enaineer• C A--T-G2 IZ,v1--(a `-�- A-)5 G( (A-T-�
Architect/Engineer E-mail: Phone:
C vr-k
Contractor: � Av rXI) az5
Contractors City License #: U € �� J (", I Phone: ) 4�1;- - L,,' -('I - q 000
Contractor E-mail Address: _ -P.A ?' ,P41 C 5A ur►-L�>Cz�� i "_� G e'. -'4-
For Plan Review Questions & Comments (please print):
CONTACT NAME (please print): k- LO -V I VL, `-A I t I e 4 - Phone: ') 63 7-7S Z _ (.. Z t�
CONTACT EMAIL(p/ease print):
C
Sub Contractors:
Electrical: 1) 'i U 1z_(}c (i
COMMERCIAL ❑ RESIDENTIAL
Description of work: (Check all that apply)
❑ NEW COMMERCIAL STRUCTURE PELECTRICAL SERVICE UPGRADE
❑ NEW RESIDENTIAL STRUCTURE ❑ COMMERCIAL ROOFING
❑ COMMERCIAL ADDITION ❑ RESIDENTIAL ROOFING
❑ RESDENTIAL ADDITION ❑ WINDOW REPLACEMENT
❑ COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
❑ MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
❑ PLUMBING SYSTEM/APPLIANCE REPAIR or REPLACMENT
❑ ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
❑ OTHER (Describe)
(For ALL projects, please provide a detailed description of work to be performed, including current use of areas,
proposed uses, square footage, existing condition and proposed new condition, appliance size and efficiency, type and
amount of materials to be used, etc.)
2er,st > Fc'eZ> Fes— t xs'S� moi✓ X- t'I t?�l Scr
N (� Y, -RR—I Com( v r r'h "►'j' N-10 TU �i.�fi 0 I'J--k-t 5 �
Sq. Ft/LF 2.Zz
Amps I IX -V
Btu's
Squares
Gallons
Other
Project Value: (Contract value or the cost of all materials and labor included in the entire project)
$ `) 95 , ZZS
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances, rules or
regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and allegations made are
accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full responsibility for compliance
with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on this application; that I am the legal owner
or have been authorized by the legal owner of the property to perform the described work and am also authorized by the legal owner of any
entity included on this application to list that entity on this application. I, the applicant for this building permit application, warrant the
truthfulness of the information provided on the application.
CIRCLEONE: (OWNER) �ONTRACTO) or (AUTHORIZED REPRESENTATIVE) of (OWNER) (CONTRACTOR)
Signature (first and last name): DATE: I ��
ZONING COMMMENTS:
Reviewer:
BUILDING DEPARTMENT COMMENTS:
Reviewer:
DEPARTMENT USE ONLY
OCCUPANCY CLASSIFICATION:
Building Division Valuation: $
Oily of
W heat T idle
CITY OF WHEAT RIDGE BUILDING AND INSPECTION SERVICES DIVISION
7500 W 29th Ave Wheat Ridge, CO 80033-8001 p. 303.235.2855.f 303.237.8929
Proof of Submission for Permitting/Plan Review
A copy of this form must be completed by each agency indicated on the Permit Submittal Checklist for
the project type and be attached to the Building Permit Application at the time of submission.
Applications presented for submission without a completed Proof of Submission form from a required
agency will not be accepted or processed.
Date:
Project Address:
Name of Firm/Individual submitting documents:
Project Type/Description:
Signature of Firm Representative or Individual:
DO NOT WRITE BELOW THIS POINT - FOR AGENCY USE ONLY
I,aU�J�/Ylf%lZ� . am a duly authorized representative of the agency
indicated below and do, by my signature below, hereby acknowledge receipt of documents necessary
for review and approval of the project indicated above.
Agency represented: (Please check one)
o Wheat Ridge Fire Protection
Arvada Fire Protection
( O Wheat Ridge Water District
o Consolidated Mutual Water District
o Valley Water District
o Denver Water
Agency Notes:
o Wheat Ridge Sanitation District
o Clear Creek Sanitation District
o Fruitdale Sanitation District
o Westridge Sanitation District
o Other
Signature: 4��y �d/� 4 Date: o _
(Agency Representative)
SCLH Wheat Ridge Clinic X -Ray
9830 W I-70 Frontage Road S.
Wheat Ridge, CO 80033
ELECTRICAL SPECIFICATIONS
December 8, 2017
��;•0...0
SCLH Wheat Ridge Clinic X -Ray Replacement
TABLE OF CONTENTS
DIVISION 26 — ELECTRICAL
26 05 00
Common Work Results for Electrical
26 05 19
Low Voltage Electrical Power Conductors and Cables
26 05 29
Hangers and Supports for Electrical Systems
26 05 33
Raceways and Boxes for Electrical Systems
26 05 34
Cabinets, Boxes and Fittings
26 05 53
Identification for Electrical Systems
26 05 83
Wiring Connections
26 22 00
Low Voltage Transformers
26 28 00
Low Voltage Circuit Protective Devices
26 50 00
Lighting
TABLE OF CONTENTS
12/08/17
SCLH Wheat Ridge Clinic X -Ray Replacement 12%08/117
SECTION 26 05 00 — COMMON WORK RESULTS FOR ELECTRICAL
PART 1 - GENERAL:
1.1 RELATED DOCUMENTS:
A. All drawings associated with the entire project, including general provisions of the
Contract, including The General Conditions of the Contract for Construction, General and
Supplementary Conditions and Division -1 Conditions specification sections shall apply to
the Division 26 specifications and drawings. The Contractor shall be responsible for
reviewing and becoming familiar with the aforementioned and all other Contract
Documents associated with the project.
B. Where contradictions occur between this section and Division 1, the more stringent
requirement shall apply.
C. Contractor shall be defined as any and all entities involved with the construction of the
project.
1.2 SUMMARY:
A. This Section specifies the basic requirements for electrical installations and includes
requirements common to more than one section of Division 26. It expands and
supplements the requirements specified in sections of Division 1.
1.3 ELECTRICAL INSTALLATIONS:
A. Drawings are diagrammatic in character and do not necessarily indicate every required
conduit, box, fitting, etc.
B. Drawings and specifications are complementary. Whatever is called for in either is
binding as though called for in both. Report any discrepancies to the Engineer and
obtain written instructions before proceeding. Where any contradictions occur between
the specifications and the drawings the more stringent requirement shall apply. The
contractor shall include pricing for the more stringent and expensive requirements.
C. Drawings shall not be scaled for rough -in measurements or used as shop drawings.
Where drawings are required for these purposes or have to be made from field
measurement, take the necessary measurements and prepare the drawings.
D. The exact location for some items in this specification may not be shown on the
drawings. The location of such items may be established by the Engineer during the
progress of the work.
E. The contractor shall make the installation in such a manner as to conform to the
structure, avoid obstructions, preserve headroom and keep openings and passageways
clear, without further instructions or costs to the Owner. All equipment shall be installed
so access is maintained for serviceability.
Before any work is begun, determine that equipment will properly fit the space and that
conduit can be run as contemplated without interferences between systems, with
structural elements or with the work of other trades.
G. Verify all dimensions by field measurements.
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-1
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
H. Arrange for chases, slots, and openings in other building components to accommodate
electrical installations.
Sequence, coordinate, and integrate installations of electrical materials and equipment
for efficient flow of the work. Give particular attention to large equipment requiring an
access path for positioning prior to closing -in the building or space.
Where mounting heights are not detailed or dimensioned, install electrical conduits,
boxes, and overhead equipment to provide the maximum headroom possible. In general,
keep installations tight to structure.
K. Install electrical equipment to facilitate maintenance and repair or replacement of
equipment components as much as practical, and connect equipment for ease of
disconnecting and removal with minimum of interference with other installations.
L. Make allowance for expansion and contraction for all building electrical components and
conduit systems that are subject to such.
M. The ceiling space shall not be "layered". It is the contractor's responsibility to offset and
coordinate any systems as required to allow installation within the identified ceiling cavity.
The contractor shall include labor and material in the base bid to accommodate such
offsets.
N. In general, all conduit systems shall be routed as high as possible. Keep all equipment in
accessible areas such as corridors and coordinate with systems and equipment from
other sections.
O. Coordinate the installation of required supporting devices and sleeves to be set in
poured -in-place concrete and other structural components, as they are constructed.
P. Coordinate the installation of electrical materials and equipment above and below ceilings
with suspension system, luminaires and other building components. Ductwork and piping
shall not be installed above electrical panelboards, switchboards, motor control centers,
and transformers.
1.4 COORDINATION:
A. Work out all installation conditions in advance of installation. The Contractor shall be
responsible for preparing coordination drawings, showing all work, in all areas. The
Contractor shall be responsible for providing all labor and material, including but not
limited to all fittings, hangers, control devices, lighting, low voltage equipment, cable tray,
conduit, transformers, disconnects, etc., necessary to overcome congested conditions at
no increase in contact sum. The Contractors base bid shall include any and all time and
manpower necessary to develop such coordination efforts and drawings. Increases to
contract sum or schedule shall not be considered for such effort.
B. Provide proper documentation of equipment, product data and shop drawings to all
entities involved in the project. Coordination shall include, but not be limited to the
following:
X -Ray Equipment Site Planning Documents.
C. Existing Conditions:
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-2
SCLH Wheat Ridge Clinic X -Ray Replacement
1.5
0
IQ
C
L�7
E
F
12/08/17
1. Contractor shall carefully survey existing conditions prior to bidding work. In addition,
Contractor shall complete a thorough ceiling cavity survey.
2. Contractor shall be responsible for showing all existing conditions on the 3D coordination
drawings.
3. Provide proper coordination of electrical work with existing conditions.
4. Contactor shall report any issues or conflicts immediately to Engineer before
commencing with work and prior to purchasing equipment and materials.
COORDINATION WITH OTHER DIVISIONS:
General:
Coordinate all work to conform to the progress of the work of other trades.
Complete the entire installation as soon as the condition of the building will permit. No
extras will be allowed for corrections of ill-timed work, when such corrections are
required for proper installation of other work.
Coordinate ceiling cavity space carefully with all trades. In the event of conflict, install
mechanical and electrical systems within the cavity space allocation in the following order
of priority:
1. Equipment and required clearances
2. Plumbing waste, cooling coil drain piping and roof drain mains and leaders.
3. Pneumatic tube systems.
4. Ductwork mains.
5. Plumbing vent piping.
6. Medical gas/lab gas systems.
7. Low pressure ductwork and air devices.
8. Electrical and communication conduits, raceways and cable tray.
9. Domestic hot and cold water.
10. Hydronic piping.
11. Fire sprinkler mains, branch piping and drops (locate as tight to structure as possible).
12. DDC control wiring and other low voltage systems.
13. Fire alarm systems.
Chases, Inserts and Openings:
Provide measurements, drawings and layouts so that openings, inserts and chases in
new construction can be built in as construction progresses.
Check sizes and locations of openings provided, including the access panels for
equipment in hard lid ceilings and wall cavities.
Any cutting and patching made necessary by failure to provide measurements, drawings
and layouts at the proper time shall be done at no additional cost in contract sum.
Support Dimensions: Provide dimensions and drawings so that concrete bases and
other equipment supports to be provided under other sections of the specifications can
be built at the proper time.
Coordinate the installation of required supporting devices and sleeves to be set in poured
in place concrete and other structural components, as they are constructed.
Coordinate the cutting and patching of building components to accommodate the
installation of electrical equipment and materials.
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-3
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
G. Modifications required as result of failure to resolve interferences, provide correct
coordination drawings or call attentions to changes required in other work as result of
modifications shall be paid for by responsible Contractor/Subcontractor.
1.6 DESIGN WORK REQUIRED BY CONTRACTOR:
A. The construction of this project requires the Contractor to include the detailing and design
of several systems and/or subsystems. All such design work associated with the
development of the coordination drawings shall be the complete responsibility of the
Contractor.
B. The Contractor shall take the full responsibility to develop and complete routing strategies
which will allow fully coordinated system to be installed in a fully functional manner. The
Engineers contract drawings shall be for system design intent and general configurations.
C. Systems or subsystems which require design responsibility by the contractor include but
are not limited to:
1. Temporary Facilities.
2. Final coordinated distribution systems within the ceiling cavity.
3. Any system not fully detailed.
4. Equipment supports, hangers, anchors and seismic systems not fully detailed nor
specified in these documents, or catalogued by the manufacturer.
1.7 PROJECT CONDITIONS:
A. The contractor shall be required to attend a pre-bid walk-thru if required and shall make
themselves familiar with the existing conditions. No additional costs to the Owner shall
be accepted for additional work for existing conditions.
B. Field verify all conditions prior to submitting bids.
C. Report any damaged equipment or systems to the Owner prior to any work.
D. Protect all work against theft, injury or damage from all causes until it has been tested
and accepted.
E. Be responsible for all damage to the property of the Owner or to the work of other
contractors during the construction and guarantee period. Repair or replace any part of
the work which may show defect during one year from the final acceptance of all work,
provided such defect is, in the opinion of the Architect, due to imperfect material or
workmanship and not due to the Owner's carelessness or improper use.
F. The Contractor shall coordinate and co-operate with Owner at all times for all new to
existing connections.
G. Provide temporary electrical connections where required to maintain existing areas
operable.
H. Coordinate all services shut -down with the Owner; provide temporary services.
Coordinate any required disruptions with Owner, at a minimum one week in advance.
Minimize disruptions to operation of electrical systems in occupied areas.
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-4
SCLH Wheat Ridge Clinic X -Ray Replacement
1.8 SAFETY:
A. Refer to Division 1
9 EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS:
A. Refer to Division 1 and conform with the Owners requirements.
10 REQUIREMENTS OF REGULATORY AGENCIES:
A. Refer to Division 1.
12/08/17
B. Execute and inspect all work in accordance with Underwriters Laboratories (UL), and all
local and state codes, rules and regulations applicable to the trade affected as a
minimum, but if the plans and/or specifications call for requirements that exceed these
rules and regulations, the more stringent requirement shall be followed. Follow
application sections and requirements and testing procedures of NFPA, IEEE, NEMA,
CBM, ANSI, NECA, ICEA, NETA, and IETA.
C. Comply with standards in effect at the date of these Contract Documents, except where a
standard or specific date or edition is indicated.
D. Energy Codes: All equipment and installations shall conform to Federal, State, and local
Energy Conservation Standards.
E. The handling, removal and disposal of regulated liquids or other materials shall be in
accordance with U.S. EPA, state and local regulations.
F. The handling, removal and disposal of lead based paint and other lead containing
materials shall comply with EPA, OSHA, and any other Federal, State, or local
regulations.
G. After entering into contract, Contractor will be held to complete all work necessary to
meet these requirements without additional expense to the Owner.
H. All material used on this project shall be UL listed and labeled and be acceptable to the
authority having jurisdiction as suitable for the use intended.
1.11 PERMITS AND FEES:
A. Refer to Division 1.
B. Contractor shall arrange for and pay for all inspections, licenses and certificates required
in connection with the work.
1.12 TEMPORARY FACILITIES:
A. Light, Heat, Power, Etc. Responsibility for providing temporary electricity, heat and other
facilities shall be as identified in these specifications, as shown on the drawings and as
specified in Division 1.
B. Building distribution equipment and devices (existing or new) shall not be used without
written permission of the Owner. If used for temporary power, the equipment shall be
properly maintained and any damage resulting from use shall be repaired by the
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-5
9-
e-
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
Contractor. The guarantee period for new equipment shall not begin until the equipment
is turned over to the Owner.
C. If AC power systems or their backup systems serving telecommunications, computer
equipment, or their associated HVAC equipment and controls are taken out of service, for
any reason, the Contractor shall be responsible for providing temporary systems during
the period when the AC power systems or their backup systems are out of service. The
Contractor shall be responsible for providing temporary power to all loads being
interrupted.
1.13 PRODUCT OPTIONS AND SUBSTITUTIONS:
A. Refer to the Instructions to Bidders and Division 1.
B. The burden of proof that proposed equipment is equal in size, capacity, performance, and
other pertinent criteria for this specific installation, or superior to that specified is up to the
Contractor. Substituted equipment will only be allowed where specifically listed in a
written addendum. If substitutions are not granted, the specified materials and
equipment must be installed. Where substituted equipment is allowed, it shall be the
Contractor's responsibility to notify all related trades of the accepted substitution and to
assume full responsibility for all costs caused as a result of the substitution.
C. Materials and equipment of equivalent quality may be submitted for substituted prior to
bidding. This may be done by submitting to the Architect/Engineer at least ten (10)
working days prior to the bid date requesting prior review. This submittal shall include all
data necessary for complete evaluation of the product.
1. Substitutions shall be allowed only upon the written approval of the Architect/Engineer
NO EXCEPTIONS.
2. The Contractor shall be responsible for removal, replacement and remedy of any system
or equipment which has been installed which does not meet the specifications or which
does not have prior approval.
1.14 SUBMITTALS:
A. General
1. Refer to the Conditions of the Contract (General and Supplementary), Division 1.
2. Contractor shall provide a submittal schedule appropriate for the size and schedule of
the project. Limit the number of large submittals being reviewed at one time and
coordinate timing of sections that are dependent on each other i.e. submit coordination
and short circuit study prior to or together with gear, overcurrent protection devices, ATS,
etc.
3. The Contractor shall identify any "long lead time" items which may impact the overall
project schedule. If these submittal requirements affect the schedule, the Contractor
shall identify the impacts and confer with the Engineer within two weeks of entering into
the contract.
4. The front of each submittal package shall be identified with the specification section
number, job name, Owner's project number, date, Prime Contractor and Subcontractor's
names, addresses, and contact information, etc. Each Specification Section shall be
submitted individually and submittal shall be tabbed for the equipment/materials/etc.
within the section. Submittals that are not complete with the required information will not
be reviewed and will be sent back to be corrected.
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-6
SCLH Wheat Ridge Clinic X -Ray Replacement
12/08/11
Submittals shall be provided electronically. All electronic submittals need to be complete
with all design information and stamped for conformity by the contractor. Submittals will
be reviewed, marked appropriately and returned by the same means received. s
An index shall be provided which includes:
a. Product
b. Plan Code (if applicable)
G. Specification Section
d. Manufacturer and Model Number
7. Submittal schedule shall be provided for review within four (4) working weeks from award
of contract to successful bidder.
B. Basis of Design: The manufacturer's material or equipment listed first in the specifications
or on the drawings are the basis of design and are provided for the establishment of size,
capacity, grade and quality. If alternates are used in lieu of the first names, the cost of
any changes in construction required by their use shall be borne by this Contractor.
C. All equipment shall conform to the State and/or local Energy Conservation Standards
D. Contractor Review: Submittal of shop drawings, product data, and samples will be
accepted only when submitted by the Contractor. Each submittal shall be reviewed by
the contractor for general conformance with contract requirements and stamped by the
respective contractor prior to submittal to the Architect/Engineer. Any submittal not
stamped or complete will be sent back. Data submitted from subcontractors and material
suppliers directly to the Architect/Engineer will not be processed unless written prior
approval is obtained by the Contractor.
E. Submittal Review Process: Before starting work, prepare and submit to the
Architect/Engineer shop drawings and descriptive product data required for the project.
Continue to submit in the stated format after each Arch itect/Engineer's action until a "No
Exception Taken" or "Make Correction Noted" action is received. When a "Make
Corrections Noted" is received, make the required corrections for inclusion in the
operation and maintenance manual (O&M). Submittals marked "Make Corrections
Noted" shall not be resubmitted during the submittal process. Unless each item is
identified with specification section and sufficient data to identify its compliance with the
specifications and drawings, the item will be returned "Revise and Resubmit". Where an
entire submittal package is returned for action by the Contractor, the Engineer may
summarize comments in letter format and return the entire set. Submittals shall be
prepared per the ELECTRICAL SUBMITTAL CHECKLIST, at the end of this section;
supplemental requirements are listed in each Division 26 Section.
F. The Design Professional's review and appropriate action on all submittals and shop
drawings is only for the limited purpose of checking for conformance with the design
concept and the information expressed in the contract documents. This review shall not
include:
1. Accuracy or completeness of details, such as quantities, dimensions, weights or gauges,
fabrication processes
2. Construction means or methods
3. Coordination of the work with other trades
4. Construction safety precautions
G. The Design Professional's review shall be conducted with reasonable promptness while
allowing sufficient time in the Design Professional's judgment to permit adequate review.
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-7
r
SCLH Wheat Ridge Clinic X -Ray Replacement
12/08/17
Review of a specific item shall not indicate that the Design Professional has reviewed the
entire assembly of which the item is a component.
H. The Design Professional shall not be responsible for any deviations from the contract
documents not brought specifically to the attention of the Design Professional in writing
by the Contractor. This shall clearly identify the design and the specific element which
vary from the Design. The Contractor shall be responsible for all remedy for lack of strict
conformance associated with this criteria.
The Design Professional shall not be required to review partial submissions or those for
which submissions of correlated items have not been received.
If more than two submittals (either for product data, shop drawings, record drawings, test
reports, or O&M's are made by the Contractor, the Owner reserves the right to charge
the Contractor for subsequent reviews by their consultants. Such extra fees shall be
deducted from payments by the Owner to the Contractor.
K. The contractor shall cloud all changes made on submittals that are marked "Revise and
Resubmit."
L. Required Submittals: Provide submittals for each item of equipment specified or
scheduled in the contract documents. See table at the end of this section.
M. Submit letters certifying compliance with ANSI standards for medium or high voltage
gear. These letters shall be signed by a corporate officer and shall list applicable
standards. Letters signed by local representatives will not be acceptable.
N. Submit proposed changes to electrical room or other equipment room layouts when
revised from contract documents prior to installation.
O. Mark submittals with designations as shown on the drawings and identify as required by
Specification Sections. Identification shall contain the information as required in details
and each label shall be submitted in list form with disconnects, MCC's, panelboards,
switchboards, overcurrent protection devices and utilization equipment.
1.15 SPECIFIC CATEGORY SUBMITTAL REQUIREMENTS:
A. Product Listing:
Prepare listing of major electrical equipment and materials for the project, within (2) two
weeks of signing the Contract Documents and transmit to the Architect
a. Provide all information requested.
b. Submit this listing as a part of the submittal requirement; see Paragraph 1.15
"PRODUCT OPTIONS AND SUBSTITUTIONS."
2. Unless otherwise specified, all materials and equipment shall be of domestic (USA)
manufacture and shall be of the best quality used for the purpose in commercial practice.
3. When two or more items of same material or equipment are required (lighting, wiring
devices, switchgear, panelboards, protective devices, etc.) they shall be of the same
manufacturer. Product manufacturer uniformity does not apply to raw materials, bulk
materials steel bar stock, welding rods, solder, fasteners, except as otherwise indicated.
a. Provide products which are compatible within systems and other connected items.
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-8
SCLH Wheat Ridge Clinic X -Ray Replacement
12/08/17
4. For conduit, wire and fittings, the Contractor shall select a prime and alternate
manufacturer from the list of acceptable manufacturers provided in the appropriate
sections of this Division. The prime and alternate manufacturers shall be identified in the
product listing. The contractor shall make every effort to use the prime manufacturer for
the entire project. If products from this manufacturer are unavailable, the Contractor
shall use the listed alternate with the following provisions.
a. Wire: All wire placed in a single conduit or installed in multiple conduits making up
parallel feeders shall be of the same manufacturer.
b. Conduit and Fittings: All conduits and fittings installed exposed within the same
room or immediate area shall be of the same manufacturer.
B. Schedule of Values
Provide Preliminary Schedule of Values to Engineer with product data submittal within
four (4) weeks from award of contract to successful bidder. Provide according to the
following descriptions:
a. General Construction (total)
b. Demolition
C. Service/Distribution
d. Lighting - Interior
e. Basic Materials/Devices/Equipment Connections (Mechanical)
2. Provide a final Schedule of Values at close-out of project including updated values based
on actual installation.
C. Product Data:
1. Where pre-printed data covers more than one distinct product, size, type, material, trim,
accessory group or other variation, mark submitted copy with black pen to indicate which
of the variations is to be provided.
2. Delete or mark -out portions of pre-printed data which are not applicable.
3. Where operating ranges are shown, mark data to show portion of range required for
project application.
4. For each product, include the following:
a. Sizes.
b. Weights.
C. Speeds.
d. Capacities.
e. Conduit and electrical connection sizes and locations.
f. Statements of compliance with the required standards and regulations.
g. Performance data.
h. Manufacturer's specifications.
i. Housing and proposed Finishes.
j. NEMA or other ratings that apply.
5. Checklist: Where identified in ELECTRICAL SUBMITTAL CHECKLIST or within
individual Division 26 Sections or necessary for confirmation of products, submit a
detailed checklist which acknowledges compliance or a reason for non-compliance to
each of the specification requirements. Arrange the checklist according to the headings
of each item identified in each specification (i.e. Shop Drawings, Wiring Diagrams,
Product requirements, individual line items, etc.) Mark items as "N/A" where the item is
not applicable.
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-9 j
J
SCLH Wheat Ridge Clinic X -Ray Replacement
D. Shop Drawings:
12/08/17
1. Shop Drawings are defined as electrical system layout drawings prepared specifically for
this project, or fabrication and assembly type drawings of system components to show
more detail than typical pre-printed materials.
2. Prepare Electrical Shop Drawings, except diagrams, to accurate scale, min 1/8"-1'-0",
Electrical rooms shall be'/4"-1'-0"unless otherwise noted.
3. Shop drawings shall include:
a. Proposed equipment installations.
b. Electrical characteristics and connection requirements.
C. Clearance dimensions at critical locations.
d. Dimensions of spaces required for operation and maintenance.
e. Interfaces with other work, including structural support.
f. Elevations when necessary in areas with multiple pieces of equipment on common
walls or to clarify incoming/exiting methods/clearances, etc.
g. Wall and floor penetrations.
h. Wiring diagrams shall showing all components, internal connecting wiring, and
contractor connection requirements including terminal blocks/lugs, wire sizes, etc.
E. Test Reports:
1. Submit test reports which have been signed and dated by the accredited firm or testing
agency performing the test.
2. Prepare test reports in the manner specified in the standard or regulation governing the
test procedure (if any) as indicated.
3. Submit test reports as required for O & M manuals.
Operation and Maintenance Data: See separate paragraph of this specification section.
G. Equipment Settings Report: Where identified in the ELECTRICAL SUBMITTAL CHECKLIST
or within individual Division 26 Sections or necessary for confirmation of products, submit
Equipment Settings Report for each device indicating final configurations and settings.
1. Provide report of settings, parameters, programing inputs and parameters, etc., installed
at each piece of electrical equipment that allows adjustments to be made in the field and
those set at the factory. The report shall be arranged by specification section and each
piece of equipment broken out individually or by listing of equipment if the same settings
are installed in multiple pieces of equipment.
2. In addition to the requirements above, include within this report any individual ground
fault system settings; zone interlock operational settings; Arc Flash reduction schemes
and levels; transfer switch settings including time delays and upstream protection device
settings with copies of listed OCPD's for each ATS; settings of monitoring equipment
including trip levels and alarm levels; Generator settings and parameters; UPS settings
and parameters; relay settings; transformer tap settings; phase rotation documentation;
lighting control settings with associated timer settings; electrical interlock and/or kirk key
system descriptions; posted operational signage; and any other pertinent information.
3. Report shall be submitted and received by the Engineer at least fifteen calendar days
prior to the contractor's request for final observation. Include in the O & M Manual after
review and "No Exceptions Taken" has been accomplished.
H. Software Licenses: Provide documentation of ownership under the owner's corporate
name (coordinate with owner's representative for exact ownership wording) for Software
Licenses provided as part of the work. Include information for updates, subscription
requirements if applicable, backup, support, login, passwords, date when purchased,
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-10
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
expiration date if applicable, version, etc. Include in the O & M Manual after review and
"No Exceptions Taken" has been accomplished.
Record Drawings: See separate paragraph of this specification section.
1.16 DELIVERY, STORAGE AND HANDLING:
A. Refer to the Division 1, Sections on Transportation and Handling and Storage and
Protection.
B. Deliver products to project properly identified with names, model numbers, types, grades,
compliance labels, and similar information needed for distinct identifications; adequately
packaged and protected to prevent damage during shipment, storage, and handling.
C. Check delivered equipment against contract documents and submittals.
D. Store equipment and materials at the site, unless off-site storage is authorized in writing.
Protect stored equipment and materials from damage and weather.
E. Coordinate deliveries of electrical materials and equipment to minimize construction site
congestion. Limit each shipment of materials and equipment to the items and quantities
needed for the smooth and efficient flow of installations.
1.17 DEMOLITION/REMODEL WORK:
A. Refer to Division 1 Section on Summary of work for requirements on working in Owner -
occupied areas of the existing building and Division 2 section on selective demolition.
The following paragraphs supplement the requirements of other Divisions.
B. During the demolition phase of this contract it is the responsibility of this Contractor to
carefully remove existing equipment, conduits, boxes, and related items either as shown
on the demolition drawings as being removed, or as required for the work. These items
shall be tagged, protected from damage and stored as directed by the Owner. A list of all
items stored shall be turned over to the Architect/Engineer. At the completion of the
remodeling work or when directed by the Architect, all stored items not reused or wanted
by the Owner shall be removed from the premises.
C. The project involves renovation and remodel of the existing building. On the drawings,
work may be denoted by showing items as bold or light line weight and certain renovation
symbols are used. These indications and symbols are amplified as follows:
Bold Print (when used): Work included in this contract is denoted in bold print or darker
line weight.
Light Print (when used): Work shown lightly indicates existing conditions to remain.
R = Existing item to be removed. Contractor shall remove the existing item and the
associated existing wiring. Where the raceway serving the equipment is accessible (via
removal of suspended ceiling, crawl space, etc.) the raceway shall also be removed.
Where the removal of a raceway leaves visible evidence on an existing surface which is
not being repaired or replaced by the General Contractor, this contractor shall repair the
surface. Where the existing raceway is concealed, the outlet box shall be cleaned, and a
blank cover -plate installed. Where the concealed raceway is uncovered by demolition
performed by the General Contractor, the raceway shall be removed (or extended to new
location if appropriate).
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-11
SCLH Wheat Ridge Clinic X -Ray Replacement
12/08/17
E = Existing item to remain, may necessitate removal and reinstallation to facilitate
new work, maintain circuit continuity. Contractor shall perform the following function
based upon the item to remain:
Luminaires - Remove only if required for new work and clean and reinstall.
Switches - Remove devices only if required for new work and clean and reinstall.
Receptacles - Remove devices only if required for new work and clean and reinstall.
Clock - Clean and reinstall.
ER= Existing item to remain, Replace device, maintain circuit continuity. Contractor
shall perform the following function based upon the item to remain:
Luminaires - Clean and install new lamps.
Switches - Remove and replace with new in existing box.
Receptacles - Remove and replace with new in existing box.
Clock - Remove and replace with new in existing box.
RL = Existing item to be Relocated. Contractor shall remove the existing item, and
store in a safe place. The existing item shall be relocated to the new position as
called for on the drawings. At Contractor's option, the existing wiring may be
extended (unused boxes shall be removed and conduit and wiring extended from
nearest concealed box unless specifically noted otherwise), or new wiring may
be run from the source. Based upon the item to be relocated, the Contractor
shall perform the following function:
Luminaires - Clean and reinstall in new location.
Receptacles - Clean and reinstall in new location.
Clocks -- Clean and reinstall in new location.
RR = Remove and Reinstall. Existing item to be Removed and Reinstalled to facilitate
new work.
D. Existing equipment that is removed and not scheduled to be reused shall remain the
property of the Owner and be delivered for disposition unless specifically indicated
otherwise and shall be stored in a location designated by the Owner. Items which are
removed and not wanted by the Owner shall become the property of the Contractor and
shall be removed from the site.
E. Existing equipment that is removed and is to be reused shall be cleaned, serviced and
operable before being reinstalled.
F. Revise panelboard schedules to reflect removal or relocation of equipment. Circuit
integrity of equipment in adjacent areas shall be left intact.
G. Where remodeling interferes with existing circuits and equipment which are not to be
removed, such circuits and equipment shall be reworked and relocated as required to
complete the project.
H. The Contractor shall remove all distribution equipment, conductors, etc., which are
indicated to be removed or which must be removed to accommodate demolition.
Equipment to be removed may require reworking conduit and wiring in order to maintain
service to other equipment.
Where remodeling interferes with circuits serving areas outside of the project or phase
limits or which are remodeled in later phases of the project, circuits shall be reworked or
temporary circuits provided as required.
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-12
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/1
J. Existing equipment and circuiting shown are based on field surveys and/or Owner
furnished drawings. The Contractor shall verify conditions as they exist with necessary
adjustments being made to the drawing information.
K. Coordinate the routing of all conduits with the existing mechanical and plumbing systems
in order to avoid conflicts with ducts, pipes, etc. Where existing electrical boxes, conduit,
or equipment interfere with installation of new ducts, plumbing, walls, soffits, luminaires,
outlets, etc., the Contractor shall resolve the conflict with the appropriate trade.
Reuse of existing luminaires, devices, conduits, boxes, or equipment will be permitted
only where specifically indicated on the drawings or allowed under the appropriate
section of the specifications.
M. Electrical Outages: Electrical outages must be held to a minimum. The Contractor shall
submit a Method of Procedure (MOP) for each outage to the Owner, detailing the
reasons for the outage, areas affected, sequence of procedures to accomplish work,
estimated maximum length of time along with the date and time of day outage will occur.
The Contractor shall meet with the Owner to set a schedule and date for the outage
based on the MOP. Due to the critical implications of power outages, the Owner may
direct the Contractor as to the time of day or night and date an outage may take place.
The Contractor will be responsible for providing temporary power required for the
duration of the outages. The required outages to connect and disconnect the temporary
power will require a MOP as described above.
Log each approved and implemented MOP and submit with O&M Manuals.
N. PCB Ballasts: PCB type ballasts may be present in existing luminaires. If PCB ballasts
are discovered by the Contractor, report such occurrence to the Owner immediately. The
Contractor shall remove and dispose of PCB type ballasts at an E.P.A. (Environmental
Protection Agency) approved site in the prescribed manner acceptable to the EPA. The
Contractor shall pay all fees associated with this work.
O. Hazardous Material: If suspected hazardous material, in any form, is discovered by this
Contractor in the process of his work, he shall report such occurrence to the Owner
immediately. The Owner will determine the action to be taken. Hazardous material
removed is not a part of the work to be done under this Division.
P. Lamp Disposal: Contractor is responsible for sending removed lamps to be recycled.
The Contractor should ensure the recycling agency meets RCRA and CERCLA
regulations. Provide certificate of compliance in O&M Manuals.
Q. On Site Metering: When called for in the specifications or on the drawings, the Contractor
shall meter the points indicated for a period of 30 days prior to start of construction to
verify existing load. Meter shall record voltage; amperage; KVA; and Power Factor for
each phase and sum of the phases. The meter shall continually average the power
demand over maximum 15 minute intervals as required by NEC 220.87. Compile a
metering summary report and deliver results to engineer after 7 days and after 30 days.
Verify existing loads at and downstream of the metering location and provide list to
engineer of what loads are not on during the 30 day metering and the reason why.
Organize list by equipment name. If any loads have been removed or permanently
abandoned, Turn circuit breaker off and relabel as SPARE.
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-13
SCLH Wheat Ridge Clinic X -Ray Replacement
1.18 CUTTING AND PATCHING:
12/08/17
A. Cutting and patching of electrical equipment, components, and materials may be required
for removal and legal disposal of selected materials, components, and equipment.
Coordinate the cutting and patching of building components to accommodate the
installation of electrical equipment and materials.
B. Refer to the Division 1 Section covering cutting and patching for general requirements.
C. Do not endanger or damage installed Work through procedures and processes of cutting
and patching.
D. Arrange for repairs required to restore other work, because of damage caused as a result
of electrical installations.
E. No additional compensation will be authorized for cutting and patching Work that is
necessitated by ill-timed, defective, or non -conforming installations.
F. Perform cutting, fitting, and patching of electrical equipment and materials required to:
1. Uncover Work to provide for installation of ill-timed Work;
2. Remove and replace defective Work;
3. Remove and replace Work not conforming to requirements of the Contract Documents;
4. Remove samples of installed Work as specified for testing;
5. Install equipment and materials in existing structures;
6. Upon written instructions from the Architect/Engineer, uncover and restore Work to
provide for Architect/Engineer observation of concealed Work.
G. Cut, remove and legally dispose of selected electrical equipment, components, and
materials as indicated, including, but not limited to removal of conductors, conduit,
luminaires, boxes, devices and other electrical items made obsolete by the new Work.
H. Protect the structure, furnishings, finishes, and adjacent materials not indicated or
scheduled to be removed.
Provide and maintain temporary partitions or dust barriers adequate to prevent the
spread of dust and dirt to adjacent areas.
Locate, identify, and protect electrical services passing through remodel or demolition
area and serving other areas required to be maintained operational.
K. When coring is required or identified, an x-ray of the area is to be taken prior to the
performance of the work operation. X-ray work requires an MOP and protection.
1.19 ROUGH -IN:
A. Verify final locations for rough -ins with field measurements and with the requirements of
the actual equipment to be connected.
B. . Refer to equipment shop drawings and manufacturer's requirements for actual provided
equipment for rough in requirements.
C. Work through all coordination before rough -in begins.
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-14
SCLH Wheat Ridge Clinic X -Ray Replacement
1.20 ACCESSIBILITY:
12/08/l/
A. Install equipment and materials to provide required code clearances and access for
servicing and maintenance. Coordinate the final location with piping, ducts, and
equipment of other trades to insure proper access for all trades. Coordinate locations of
concealed equipment, disconnects, and boxes with access panels and doors. Allow
ample space for removal of parts, fuses, lamps, etc. that require replacement or
servicing.
B. Extend all conduits so that junction and pull boxes are in accessible locations.
C. Provide access panel or doors where equipment or boxes are concealed behind finished
surfaces.
D. Furnish hinged steel access doors with concealed latch, whether shown on drawings or
not, in all walls and ceilings for access to all concealed valves, shock absorbers, air
vents, motors, fans, balancing cocks, and other operating devices requiring adjustment or
servicing. Refer to Division 1 for access door specification and requirements.
E. The minimum size of any access door shall not be less than the size of the equipment to
be removed or 12 inches x 12 inches if used for service only.
F. Furnish doors to trades performing work in which they are to be built, in ample time for
building in as the work progresses. Whenever possible, group valves, cocks, etc., to
permit use of minimum number of access doors within a given room or space.
G. Factory manufactured doors shall be of a type compatible with the finish in which they are
to be installed. In lieu of these doors, approved shop fabricated access doors with
DuroDyne hinges may be used.
H. Access doors in fire rated walls and ceilings shall have equivalent U.L. label and fire
rating.
1.21 TESTING:
A. Submit test reports as outlined in Division 1 Sections on Quality Control Services and
each Division 26 Section.
B. Testing as required by these specifications shall pertain to all equipment, wiring, devices,
etc. installed under this contract and being reused.
C. General Scope:
1. Perform all tests and operational checks to assure that all electrical equipment, both
Contractor and Owner -supplied, is operational within industry and manufacturer's
tolerances and is installed in accordance with design specifications.
2. The tests and operational checks shall determine the suitability for energization.
3. Schedule tests and give a minimum of two weeks advance notice to the
Arch itect/Engineer. Reschedule testing for Owner convenience if required.
D. Test Report: Submit the completed report to the Architect/Engineer no later than fifteen
(15) days after completion of test unless directed otherwise. The test report shall be
bound and its contents certified. A final compilation of all Test Reports shall be submitted
with the Testing and Equipment Settings Report (Refer to Operation and Maintenance
Data paragraphs).
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-15
SCLH Wheat Ridge Clinic X -Ray Replacement
E. Each test report shall include the following:
12/08/17
1. Project information including: Building, name, address, date, and other pertinent
information.
2. List of equipment tested.
3. Description of test.
4. List of test equipment used and calibration date.
5. Baseline, acceptable, or published target value for test with code or standard reference
indicating where value was derived.
6. Test results that summarize all measured values with baseline values.
7. Conclusions and recommendations.
8. Appendix, including appropriate test forms that show all measured values.
F. Failure to Meet Test:
1. Any system material or workmanship which is found defective on the basis of
performance tests shall be reported directly to the Architect/Engineer.
2. All failed tests shall be sent immediately by email to Architect/Engineer with proposed
corrective action and proposed re -test date and time.
3. Contractor shall replace the defective material or equipment as necessary, and have test
repeated until test proves satisfactory without additional cost to the Owner.
G. The testing agency shall have a calibration program which maintains all applicable test
instrumentation within rated accuracy. The accuracy shall be traceable to the National
Institute of Standards and Technology (NIST) in an unbroken chain. Instruments shall be
calibrated in accordance with the following frequency schedule:
1. Field Instruments: 6 months
2. Laboratory Instruments: 12 months
3. Leased specialty equipment: 12 months. (Where accuracy is guaranteed by lessor
4. Dated calibration labels shall be visible on all test equipment.
1.22 METHODS OF PROCEDURE (MOP):
A. Definition: Method of Procedure (MOP) is a written plan which describes the activities
and procedures to safeguard the building's occupants and contents and to interface with
the building's management, operations and security. Building occupants shall be defined
as employees, patients, and visitors.
B. Requirements:
1. An MOP is required when a construction activity affects the safety of the occupants,
equipment or valuable contents, or any supporting system; or essentially affects the
building's management, operations or security.
2. An MOP is required for any shutdown or interruption of any system which affects the
building occupants, including, but not limited to, infrastructure, life safety, electrical, and
building management systems.
3. An MOP is required when requested or deemed necessary by the Owner or Engineer.
C. Development:
1. The Prime Contractor shall develop, submit, track and process the MOP. Any assistance
required by the Subcontractors shall be provided. All MOPs shall be reviewed by the
Prime Contractor prior to submitting the MOP to the Engineer.
2. All MOPs Shall Be Typed.
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-16
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
3. Contractor shall develop the MOP in a timely fashion prior to review and approval by all
required parties.
4. Contractor shall develop the MOP with input from the subcontractor, where necessary. _
D. Form: Each MOP shall be a written document in narrative, descriptive or outline form
supplemented with drawings, diagrams and schedules as necessary.
E. Review and Approval: Contractor shall submit each MOP to the Engineer for review and
approval. All MOPs require Owner's approval.
F. Implementation: Contractor shall implement the MOP when approved by the Engineer
and Owner in writing. No construction activity which requires a MOP shall proceed until
the MOP is approved.
G. Compliance: Contractor shall comply with the approved MOP. The Owner and Engineer
reserve the right to stop the work for non-compliance with the MOP. Any cost or time
delay resulting from the work stoppage shall be borne by the Contractor.
H. Posting: Work shall not proceed on any facet of the work involving any MOP if an
approved and signed MOP is not posted in the work area.
1.23 CLEANING:
A. Refer to the Division 1 Section on project closeout or final cleaning for general
requirements for final cleaning.
B. Clean all luminaires, lamps and lenses per manufacturer's recommendations prior to final
acceptance. Replace all inoperative lamps.
1.24 RECORD DOCUMENTS:
A. Refer to the Division 1 Section on Project Closeout or Project Record Documents for
requirements. The following paragraphs supplement the requirements of Division 1.
B. Keep a complete set of record document prints in custody during entire period of
construction at the construction site. Documents shall be updated on a weekly basis.
C. Mark Drawings to indicate revisions to conduit size and location both exterior and interior;
actual equipment locations, dimensioned from column lines; concealed equipment,
dimensioned to column lines; distribution and branch electrical circuitry; fuse and circuit
breaker size and arrangements; support and hanger details; concealed control system
devices, and any other relevant deviations from the Contract Documents.
D. Mark shop drawings to indicate approved substitutions; Addenda; Change Orders; actual
equipment and materials used.
E. Schedules:
Mark luminaire schedule on drawings to indicate manufacturer and complete catalog
numbers of installed equipment.
Mark schedules including panelboard, switchboard, motor control center, mechanical,
kitchen and similar equipment schedules on drawings to indicate installed equipment and
materials used, and any deviations or revisions to electrical load data and calculations.
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-17
r
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
F. Revisions to the Contract Documents shall be legible and shall be prepared using the
following color scheme.
Red shall indicate new items, deviations and routing.
Green shall indicate items removed or deleted.
Blue shall be used for relevant notes and descriptions.
G. At the completion of the project, obtain from the Architect a complete set of the Contract
Documents in a read-only electronic format (.pdf unless otherwise noted). This set will
include all revisions officially documented through the Architect/Engineer. Using the
above color scheme, transfer any undocumented revisions from the construction site
record drawings to this complete set. Submit marked up and completed documents to
the Architect/Engineer. This contract will not be considered completed until these record
documents have been received and reviewed by the Architect/Engineer.
H. Contractor may propose methods of maintaining record documents on electronic media.
Obtain approval of Engineer and Owner prior to proceeding. Marked -up .pdf format
readable by Bluebeam is preferred.
One full size set of record drawing one line diagrams shall be posted in the electrical
room and one half size set of the remaining electrical record drawings shall be bound
with 3 Hole inserts and plastic cover and stored in the electrical room.
1.25 OPERATION AND MAINTENANCE DATA:
A. Refer to the Division 1 Section on project closeout or operation and maintenance data for
procedures and requirements for preparation and submittal of maintenance manuals.
B. No later than four (4) weeks prior to the completion of the project provide complete set of
operating and maintenance manuals, or as specified in Sections of Division 1 (whichever
is more stringent). Operation and Maintenance Data shall be submitted in electronic
format.
C. Operation and Maintenance Data: Submit operation and maintenance data in
maintenance manual in accordance with requirements of applicable Division 26 Sections
and Division 1. Provide Operating and Maintenance Instructions in electronic format
covering all equipment furnished. Manuals shall include all information required below,
as indicated in each Division 26 Section, and the following for each piece of equipment:
1. The job name and address, contractor's name, address, and phone number, and each
subcontractor's name, address, and phone number shall be identified at the front of the
electronic submittal.
2. Name, address and telephone number to be contacted of the local authorized service
organization/company and individual to be contacted for service and maintenance for
each item of equipment.
3. Submit operation and maintenance data, schedule of recommended service and parts
lists for all materials and products specified and intended for installation. Include
description of function, normal operating characteristics and limitations, fuse curves,
engineering data and tests, and complete nomenclature and commercial numbers of all
replaceable parts.
4. Manufacturer's printed operating procedures to include start-up, break-in, routine and
normal operating instructions; regulation, control, stopping, shut -down, and emergency
instructions; and summer and winter operating instructions.
5. Maintenance procedures for routine preventative maintenance and troubleshooting;
disassembly, repair, and reassembly; aligning and adjusting instructions.
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-18
SCLH Wheat Ridge Clinic X -Ray Replacement
12/08/17
6. Servicing instructions and lubrication charts and schedules.
7. Manufacturer's service manuals for all electrical equipment provided under this contract.
8. Complete equipment and protection wiring diagrams. All wiring diagrams shall show color
coding of all connections and mounting dimensions of equipment. —
9. Equipment identification numbers and adjustment clearly indicated for each piece of
equipment.
10. Electrical System and Equipment Warranties.
11. Provide manuals tabbed and divided into major sections and special equipment. Mark
the individual equipment when more than one model or make is listed on a page.
Provide detailed table of contents.
12. Record Set of Shop Drawings: Shop drawings corrected to show as -built conditions.
Transfer modifications from field set.
13. Equipment Testing Report including all test reports and Equipment Settings Report
indicating final configurations and settings.
D. This contract will not be considered completed nor will final payment be made until all
specified material, including test reports, settings reports, and final Schedule of Values
with all Electrical and Information Technology change order costs included and identified
is provided and the manual is reviewed by the Arch itect/Engineer.
1.26 PROJECT CLOSEOUT LIST:
A. In addition to the requirements specified in Division 1, complete the requirements listed
below.
The contractor shall be responsible for providing the items listed on the Electrical
Submittal Checklist prior to applying for certification of substantial completion. Refer to
individual specification sections for additional requirements (Checklist is located at the
end of this section.)
Final payment will not be authorized until all items on the final punch list have been
complete.
1.27 WARRANTIES:
A. Refer to the Division 1 Section on Warranties and Bonds for procedures and submittal
requirements for warranties. Refer to individual equipment specifications for warranty
requirements. In no case shall the warranty for the total electrical system be less than
one year from date of acceptance by the Owner.
B. Compile and assemble the warranties specified in Division 26, into a separated set of
vinyl covered, three ring binders, tabulated and indexed for easy reference.
C. Provide complete warranty information for each item. Information to include product or
equipment description, date of beginning of warranty or bond; duration of warranty or
bond; and names, addresses, and telephone numbers and procedures for filing a claim
and obtaining warranty services.
1.28 CONSTRUCTION REQUIREMENTS:
A. The contractor shall maintain and have available at the jobsite current information on the
following at all times:
Up to date record drawings.
Addenda
Change Orders
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-19
SCLH Wheat Ridge Clinic X -Ray Replacement
4. Submittals
5. Site observation reports with current status of all action items.
6. Test results; including recorded values, procedures, and other findings.
7. Outage information.
1.29 ELECTRICAL SUBMITTAL CHECKLIST:
A. Provide submittals including shop drawings, product data, product checklists, tests and
reports, training, extra material, coordination drawings, record drawings, O&M manuals,
device setting reports, and software licenses per the following schedule:
Division 26
12/08/17
C — Product Checklist; Q — Qualifications, CD — Coordination Drawings, RD - Record Drawings, D — Device Setting Report; S — Software License, W —
Special Project Warranty
Requirements
Report Data
Factory
Factory Rep
Training
Extra
Other
SPEC
TITLE
Shop
Product
Section
Test
Test
Report
Supervision
Req'd at Site
Material
O&M
Drawings
Data
at Site
26 05 00
Common Work Results For
Electrical
Existing Conditions Survey
X
Drawings
Product Listing
X
X
C
Preliminary Schedule Of
X
Values
Final Schedule Of Values
X
X
Lamp disposal Certificates
X
X
X
/PCB/Hazardous Material
Electrical On -Site Metering
X
X
X
Reports
Tests
X
X
X
X
X
X
X
X
D
Completed/Signed MOP's
X
X
Record Drawings including
X
changes to existing Equip.
X
O&M Manuals
X
X
X
X
X
X
X
C,D,S
Project Closeout List
X
X
Contractor/Equipment
X
X
Warranties
Low Voltage Electrical
26 05 19
Power Conductors And
X
X
X
X
Cables
26 05 26
Grounding And Bonding
X
X
X
X
X
For Electrical Systems
260529
Hangers And Supports For
X
X
X
Electrical Systems
26 05 33
Raceway And Boxes For
X
X
CD, RD
Electrical Systems
Electrical Metallic Tubing
X
CD, RD
Flexible Metal Conduit
X
CD, RD
Liquid -Tight Flexible
X
CD, RD
Conduit
26 05 34
Cabinets, Boxes & Fittings
X
X
CD, RD
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-20
SCLH Wheat Ridge Clinic X -Ray Replacement
12/08/17
C — Product Checklist; Q — Qualifications, CD — Coordination Drawings, RD - Record Drawings, D — Device Setting Report; S — Software License, W —
Special Project Warranty
SPEC
Section
TITLE
Requirements
Report Data
Test
Factory
Test
Report
Factory Rep
Supervision
at Site
Training
Req'd at Site
Extra
Material
O&M
Other
Shop
Drawings
Product
Data
26 05 53
Identification For Electrical
Systems
X
X
X
26 05 83
Wiring Connections
X
X
X
D
26 22 00
Low Voltage Transformers
X
X
X
X
X
C, CD, RD,
D,S
26 27 26
Wiring Devices
X
X
X
X
26 28 00
Low Voltage Circuit
Protective Devices
X
X
X
X
X
X
X
C, D.S
26 50 00
Lighting
X
X
X
X
X
X
LED's, Drivers
X
X
X
X
X
W
END SECTION 26 05 00
COMMON WORK RESULTS FOR ELECTRICAL 26 05 00-21
s
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
SECTION 26 05 19 — LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
PART 1 - GENERAL
1.1 SUMMARY:
A. This section includes wires, cables, and connectors for power, lighting, signal, control, and
related systems rated 600 volts and less.
1.2 QUALITY ASSURANCE:
A. Manufacturers: Firms regularly engaged in manufacture of electrical wire and cable products of
types, sizes, and ratings required, whose products have been in satisfactory use in similar
service for not less than 5 years.
B. Installer's Qualifications: Firm with at least 3 years of successful installation experience with
projects utilizing electrical wiring and cabling work similar to that required for this project.
C. Conform to applicable code regulations regarding toxicity of combustion products of insulating
materials.
1.3 SUBMITTALS:
A. See Section 26 05 00 Common Work Results for Electrical for Submittal requirements.
Supplemental information is listed within this section.
B. Product Data: Submit manufacturer's data on electrical wires, cables and connectors.
1.4 DELIVERY, STORAGE, AND HANDLING:
A. Deliver wire and cable properly packaged in factory- fabricated type containers, or wound on
NEMA -specified type wire and cable reels.
B. Store wire and cable in clean dry space in original containers. Protect products from weather,
damaging fumes, construction debris and traffic.
C. Handle wire and cable carefully to avoid abrading, puncturing and tearing wire and cable
insulation and sheathing. Ensure that dielectric resistance integrity of wires/cables is
maintained.
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS:
A. Manufacturers: Subject to compliance with requirements, provide products by the following (for
each type of wire, cable, and connector):
1. Wire and Cable:
a. American Insulated Wire
b. Belden
C. Cerrowire
d. Encore Wire
e. General Cable Corporation.
f. Southwire Company
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 19- 1
SCLH Wheat Ridge Clinic X -Ray Replacement
g. Okonite
h. Superior Essex:
1) Triangle
2) Excel
3) Royal
2. Connectors:
a. O-Z/Gedney Co.
b. AMP, Inc.
C. Burndy Corporation.
d. Ideal Industries, Inc.
e. 3M Company
f. Thomas and Betts Corp.
2.2 WIRES AND CABLES:
12/08/17
A. General: Provide wire and cable suitable for the temperature, conditions, and location where
installed.
B. Conductors: Provide stranded conductors and approved connectors for all power, control, and
lighting circuits.
C. Conductor Material: Provide copper for all wires and cables.
1. Armored -Type HCF Cable: Sizes 12 AWG and 10 AWG, copper conductors with 600 volt
thermoplastic insulation rated 90 degrees C, galvanized steel interlocked metal type
armor and bond wire that is clearly identified as an acceptable return grounding path. A
green insulated equipment grounding conductor shall be included in the assembly. Color
coated green. Fitting shall be steel with double grip saddle and locking nut.
2.3 CONNECTORS:
A. Description: Provide UL -type factory -fabricated, solderless metal connectors of sizes, ampacity
ratings, materials, types and classes for applications and for services indicated. Use
connectors with temperatures equal to or greater than those of the wires upon which used.
B. Provide 2 -hole compression lugs for all power feeder, neutral, and grounding connections when
installed on bus bars. (Including phase, neutral and grounding conductors).
C. Provide connectors that are designed to accept stranded conductors where stranded
conductors are used.
PART 3 - EXECUTION
3.1 WIRE AND CABLE INSTALLATION SCHEDULE:
A. Building Wire: Install all building wire in raceway regardless of location.
B. HCF:
1. Maximum of 6 feet unsupported length for connecting luminaires in accessible ceilings to
the local junction box.
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 19- 2
IL
SCLH Wheat Ridge Clinic X -Ray Replacement
12/08/17
2. Maximum of 6 feet unsupported length for connecting luminaires in non -accessible
ceilings to the local junction box.
3. In stud walls and casework for horizontal branch circuit runs between devices.
4. For vertical branch circuit drops from a local junction box in each room above an
accessible ceiling to the direct or single device in a stud wall, casework, under counter
lighting.
5. May not be used for branch circuit home runs, feeders, motor feeder circuits or in the
following locations:
a. Hazardous locations
b. Emergency Systems
6. Branch circuit conductors shall match color coding schedule within this specification
section.
C. Portable Cord: Use for flexible pendant leads to luminaires, outlets, and equipment where
indicated and in compliance with codes.
3.2 INSTALLATION OF WIRES AND CABLES:
A. General: Install electrical cables, wires and connectors in compliance with applicable
requirements of NEC, NEMA, UL, and NECA's "Standard of Installation", and in accordance
with recognized industry practices.
B. Coordinate wire/cable installation work, including electrical raceway and equipment connection
work, with other work.
C. Pull conductors simultaneously where more than one is being installed in same raceway. Use
pulling compound or lubricant, where necessary; compound used must not deteriorate
conductor or insulation.
D. Use pulling means including, fish tape, cable, rope and basket weave wire/cable grips which will
not damage cables or raceway. Do not use rope hitches for pulling attachment to wire or cable.
E. Keep conductor splices to minimum. Splice only in accessible junction boxes. No splices are
allowed in feeder, control or fire alarm wiring. Connect unspliced wire to numbered terminal
strips at each end.
F. Install splices and taps which possess equivalent or better mechanical strength and insulation
ratings than conductors being spliced.
G. Use splice and tap connectors which are compatible with conductor material.
H. Tighten electrical connectors and terminals, including screws and bolts, in accordance with
manufacturer's published torque tightening values. Where manufacturer's torqueing
requirements are not indicated, tighten connectors and terminals to comply with tightening
torques specified in UL Std. 486A for copper and 486B for aluminum.
I. Support cables above accessible ceilings. Independent from the ceiling suspension system to
support cables from structure, do not rest on ceiling tiles.
Provide adequate length of conductors within electrical enclosures and train the conductors to
terminal points with no excess. Bundle multiple conductors, with conductors larger than No. 10
AWG cabled to individual circuits. Make terminations so there is no bare conductor at the
terminal.
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 19- 3
SCLH Wheat Ridge Clinic X -Ray Replacement
12/08/17
K. Use solderless pressure connectors with insulating covers for copper wire splices and taps, 8
AWG and larger. For 10 AWG and smaller, use insulated screw on type spring wire connectors
with plastic caps, push on type are not acceptable.
L. Use copper compression connectors for copper wire splices and taps, 1/0 AWG and larger.
Tape uninsulated conductors and connectors with electrical tape to 150 percent of the insulation
value of the conductor.
M. Make splices, taps and terminations to carry full ampacity of conductors without perceptible
temperature rise.
N. Thoroughly tape the ends of spare conductors in boxes and cabinets.
O. Install exposed cable, parallel and perpendicular to surfaces, or exposed structural members,
and follow surface contours, where possible.
P. Make all ground, neutral and line connections to receptacle and wiring device terminals as
recommended by manufacturer. Provide ground jumper from outlet box to individual ground
terminal of devices.
Q. Branch circuits whose length from panel to first outlet exceeds 100 feet for 120 volt circuits or
175 feet for 277 volt circuit shall be #10 or larger, as required to comply with the National
Electrical Code.
R. Parallel conductors shall be cut to the same length.
S. All splices in control panels, terminal junction boxes, low voltage control circuits, fire alarm, etc.,
conductors shall be on numbered terminal strip.
T. Provide wire training, lacing, labeling, and terminal blocks as required in panelboards and all
control cabinets including, but not limited to, lighting, transfer switch, fire alarm, and security
cabinets. All wiring shall be installed neat and be labeled to match wiring diagrams, control
devices, etc.
Make temporary connections to panelboard devices with sufficient slack conductor to
facilitate reconnections required for balancing loads between phases.
U. Color coding of switch legs, travelers, etc. shall be different and distinct from phase and neutral
conductors. Where systems utilize two (2) different voltages, the color coding of switch legs,
travelers, etc. shall be different and distinct for each voltage system.
3.3 FIELD QUALITY CONTROL:
A. Test installed wires and cables with 1000 VDC megohm meter to determine insulation
resistance levels to ensure requirements are fulfilled. Test shall be made on all feeders
regardless of size and on all branch circuits with No. 4 AWG and larger conductors. The
megger values obtained shall be compared to the minimum values listed in NETA. All phase
conductors and cables shall be meggered after installation, and prior to termination. Submit test
report.
B. Prior to energization, test wires and cables for electrical continuity and for short-circuits.
C. Subsequent to wire and cable hook-ups, energize circuitry and demonstrate functioning in
accordance with requirements. Where necessary, correct malfunctioning units, and then retest
to demonstrate compliance.
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 19- 4
SCLH Wheat Ridge Clinic X -Ray Replacement
3.4 COLOR CODING SCHEDULE:
A. Color code secondary service, feeder, and branch circuit conductors as follows:
120/208 Volts Phase 277/480 Volts
12/08/17
Black A Brown
Red B Orange
Blue C Yellow
White Neutral Gray
Green Ground Green
B. Conductors shall be solid color for entire length.
C. If solid color conductor insulation is not available and specific acceptance is given by the
engineer for use of black conductor insulation, provide the following:
Conductors 6 AWG and smaller shall be solid color for the entire length.
Conductors 4 AWG and larger shall have either solid color insulation as specified above
for the entire length or be black with color coding at each termination and in each box or
enclosure. For a distance of 6 inches use half -lapped 3/4 inch plastic tape in the above
specified color. Do not cover cable identification markings. Adjust tape locations to
prevent covering of markings.
END OF SECTION 26 05 19
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 19- 5
SCLH Wheat Ridge Clinic X -Ray Replacement 12/O8/1
SECTION 26 05 29 — HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY:
A. This Section includes secure support from the building structure for electrical items by means of
hangers, supports, anchors, sleeves, inserts, seals, and associated fastenings.
1.2 SUBMITTALS:
A. See Section 26 05 00 Common Work Results for Electrical for Submittal requirements.
Supplemental information is listed within this section.
B. Product data for each type of product specified.
1. Hanger and support schedule showing manufacturer's figure number, size, spacing,
features, and application for each required type of hanger, support, sleeve, seal, and
fastener to be used.
C. Shop drawings indicating details of fabricated products and materials.
D. Engineered Design consisting of details and engineering analysis for supports for the following
items:
1. Suspended transformers
2. Trapeze hangers for multiple conduit runs.
PART 2 - PRODUCTS
2.1 MANUFACTURERS:
A. Manufacturers: Subject to compliance with requirements, provide products by the following:
1. Slotted Metal Angle and U -Channel Systems:
a. Allied Tube & Conduit
b. B -Line Systems, Inc.
C. Unistrut Diversified Products
2. Conduit Sealing Bushings:
a. O-Z/Gedney
b. Cooper Industries, Inc.
C. Killark Electric Mfg. Co.
d. Madison Equipment Co.
e. Raco, Inc.
f. Spring City Electrical Mfg. Co.
g. Thomas & Betts Corp.
2.2 COATINGS:
A. Coating: Supports, support hardware, and fasteners shall be protected with zinc coating or with
treatment of equivalent corrosion resistance using approved alternative treatment, finish, or
inherent material characteristic. Products for use outdoors shall be hot -dip galvanized.
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529-1
a
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
2.3 MANUFACTURED SUPPORTING DEVICES:
A. Raceway Supports: Clevis hangers, riser clamps, conduit straps, threaded C -clamps with
retainers, ceiling trapeze hangers, wall brackets, and spring steel clamps.
B. Fasteners: Types, materials, and construction features as follows:
1. Expansion Anchors: Carbon steel wedge or sleeve type.
2. Toggle Bolts: All steel springhead type.
3. Powder -Driven Threaded Studs: Heat-treated steel, designed specifically for the
intended service.
C. Conduit Sealing Bushings: Factory -fabricated watertight conduit sealing bushing assemblies
suitable for sealing around conduit, or tubing passing through concrete floors and walls.
Construct seals with steel sleeve, malleable iron body, neoprene sealing grommets or rings,
metal pressure rings, pressure clamps, and cap screws.
D. Cable Supports for Vertical Conduit: Factory -fabricated assembly consisting of threaded body
and insulating wedging plug for non -armored electrical cables in riser conduits. Provide plugs
with number and size of conductor gripping holes as required to suit individual risers. Construct
body of malleable -iron casting with hot -dip galvanized finish.
E. U -Channel Systems: 12 -gage steel channels, with 9/16 inch -diameter holes, at a minimum of 8
inches on center, in top surface. Provide fittings and accessories that mate and match with
U -channel and are of the same manufacture.
F. Supports: Provide supporting devices of types, sizes and materials indicated; and having the
following construction features:
1. One -Hole Conduit Straps: For supporting 1 inch and smaller rigid metal conduit;
galvanized steel.
2. Two -Hole Conduit Straps: For supporting 1 inch and larger rigid metal conduit,
galvanized steel; % inch strap width; and 2-1/8 inch between center of screw holes.
2.4 FABRICATED SUPPORTING DEVICES:
A. General: Shop- or field -fabricated supports or manufactured supports assembled from
U -channel components.
B. Steel Brackets: Fabricated of angles, channels, and other standard structural shapes. Connect
with welds and machine bolts to form rigid supports.
C. Pipe Sleeves: Provide pipe sleeves of one of the following:
1. Steel Pipe: Fabricate from Schedule 40 galvanized steel pipe.
2. EMT, IMC, or Rigid Conduit.
2.5 FIRE SEALS:
A. Material: Fire stopping material shall be asbestos free, 100 percent intumescent, have code
approval under BOCA, ICBO, SSBC, NFPA 101, NFPA 70, and be capable of maintaining an
effective barrier against flame and gases in compliance with the following requirements.
B. Flame Spread: 25 or less, ASTM E84
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529-2
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
C. Fire Resistance and Hose Stream Tests: Fire stopping materials shall be rated "F" and "T" in
accordance with ASTM E 814 or UL 1479. Rating periods shall conform to the following:
(F) 3 (T) 3 Time -rated floor or wall assemblies.
(F) 3 (T) 3 Openings between floor slabs and curtain wall.
D. Manufacturers: Subject to compliance with requirements, provide fire seals of the following:
1. 3M Company
2. STI
3. Tremco
4. Hilti
PART 3 - EXECUTION
3.1 INSTALLATION:
A. Install supporting devices to fasten electrical components securely and permanently in
accordance with NEC requirements.
B. Coordinate with the building structural system and with other electrical installation.
C. Junction Box Supports: Comply with the NEC and the following requirement:
Use 1/4" all -thread rod from structure to support junction boxes.
D. Raceway Supports: Comply with the NEC and the following requirements:
1. Conform to manufacturer's recommendations for selection and installation of supports.
2. Strength of each support shall be adequate to carry present and future load multiplied by
a safety factor of at least four. Where this determination results in a safety allowance of
less than 200 lbs., provide additional strength until there is a minimum of 200 lbs. safety
allowance in the strength of each support.
3. Install individual and multiple (trapeze) raceway hangers and riser clamps as necessary
to support raceways. Provide U -bolts, clamps, attachments, and other hardware
necessary for hanger assembly and for securing hanger rods and conduits.
4. Use #9 ceiling wire to support individual conduits up to 3/4inch with spring steel
fasteners. Use of ceiling support wires is unacceptable.
5. Support parallel runs of horizontal raceways together on trapeze -type hangers. Use 3/8
inch diameter or larger threaded steel rods for support.
6. Support individual horizontal raceways by separate pipe hangers. Spring steel fasteners
may be used in lieu of hangers only for 1-1/2 inch and smaller raceways serving lighting
and receptacle branch circuits above suspended ceilings only. For hanger rods with
spring steel fasteners, use '/4 inch -diameter or larger threaded steel. Use spring steel
fasteners that are specifically designed for supporting single conduits or tubing. For
hanger rods supporting 1-1/2 inch or larger conduits provide 3/8 inch minimum threaded
steel rods with pipe hangers.
7. Space supports for raceways in accordance with NEC. When there are 4 or more 2 inch
conduits in a trapeze, supports shall be spaced 5 feet O.C.
8. In all runs, arrange support so the load produced by the weight of the raceway and the
enclosed conductors is carried entirely by the conduit supports with no weight load on
raceway terminals.
9. Threaded rod supports to have bottoms cut off at a maximum length equal to rod
diameter below bottom nut.
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529-3
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
E. Conductor or Cable Supports: Comply with the NEC and the following requirements:
Support individual conductors or cables by separate clamps with rubber or plastic
grommet, fasten using a non-metallic bolt and nut, and secure clamps to unistrut
supports anchored to structure (multiple clamps may be secured to a single unistrut
support). Individual conductors or cables may be served utilizing a vinyl or fiberglass
clamp which shall be anchored to the structure.
Space supports as follows:
a. Horizontal conductors not more than 3 feet o.c.
b. Vertical conductors not more than 5 feet o.c.
3. Install simultaneously with installation of conductors.
4. HCF and MC Cable shall be supported by UL listed clip or clamp. Cable tie support is not
acceptable.
Miscellaneous Supports: Support miscellaneous electrical components separately and as
required to produce the same structural safety factors as specified for raceway supports. Install
metal channel racks for mounting cabinets, panelboards, disconnects, control enclosures, pull
boxes, junction boxes, transformers, and other devices.
G. In overhead spaces, support metal boxes directly from the building structure via 1/4" minimum
all -thread or by bar hangers. Where bar hangers are used, attach the bar to raceways on
opposite sides of the box and support the raceway with an approved type of fastener not more
than 24 inches from the box. Supporting metal boxes utilizing ceiling type wire is not
acceptable.
H. Sleeves: Install in concrete slabs and walls and all other fire -rated floors and walls for cable
installations as required. Where sleeves through floors are installed, extend above finish floor.
For sleeves through fire rated -wall or floor construction, apply UL -listed fire stopping sealant in
gaps between sleeves and cables in accordance with "Fire Resistant Joint Sealers" requirement
of Division 7 Section "Joint Sealers." See Architectural plans for location and extent of fire rated
assemblies.
Conduit Seals: Install seals for conduit penetrations of exterior walls below grade. Tighten
sleeve seal screws until sealing grommets have expanded to form watertight seal.
Fastening: Unless otherwise indicated, fasten electrical items and their supporting hardware
securely to the building structure, including but not limited to conduits, raceways, cables, cable
trays, busways, cabinets, panelboards, transformers, boxes, disconnect switches, and control
components in accordance with the following:
1. Fasten by means of wood screws or screw-type nails on wood, toggle bolts on hollow
masonry units, concrete inserts or expansion bolts on concrete or solid masonry, and
machine screws, welded threaded studs, or spring -tension clamps on steel. Threaded
studs driven by a powder charge and provided with lock washers and nuts may be used
instead of expansion bolts and machine or wood screws, where authorized by the Owner
and structural engineer. Do not weld conduit, pipe straps, or items other than threaded
studs to steel structures. In partitions of light steel construction, use sheet metal screws.
2. Holes cut to depth of more than 1-1/2 inches in reinforced concrete beams or to depth of
more than 3/4 inch in concrete shall not cut the main reinforcing bars. Fill holes that are
not used.
3. Ensure that the load applied to any fastener does not exceed 25 percent of the proof test
load. Use vibration- and shock -resistant fasteners for attachments to concrete slabs.
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529-4
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
3.2 PERSONNEL PROTECTION:
A. Where U -channel systems, angles, brackets or other standard structural metal shapes are
readily accessible and exposed to personnel, provide plastic or rubber end caps.
B. Where threaded rod supports are readily accessible and exposed to personnel, provide plastic
or rubber end caps.
3.3 FIRE STOPPING LOCATIONS:
A. Preparation:
1. Coordination: Coordinate the work with other trades. Fire stopping materials at
penetrations of insulated pipes and ducts can be applied after insulation is in place. If
insulation is composed of combustible material, the thickness of fire stopping materials
must be equivalent to that of the insulation. If the insulation is composed of non-
combustible material, it may be considered as part of the penetrating item.
2. Surface Preparation: Surface Preparation to be in contact with fire stopping materials
shall be free of dirt, grease, oil, loose material or other substances that may affect proper
fitting or the required fire resistance.
B. Installation: Install fire stopping materials in accordance with the manufacturer's instructions.
C. Cleaning: After completion of fire stopping work in any area, equipment shall be reviewed and
walls, ceilings and all other surfaces shall be cleaned of deposits of firestop materials.
D. Inspection: The architect may select and the Owner will pay an independent testing laboratory
to examine fire stopped areas to ensure proper installation prior to concealing or enclosing the
fire stopped areas.
END OF SECTION 26 05 29
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529-5
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
SECTION 26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY:
A. Extent of raceway work is indicated by drawings and schedules. Provide complete conduit
systems for all conductors unless otherwise specified.
B. Types of raceways specified in this section include the following:
1. Electrical metallic tubing (EMT).
2. Flexible metal conduit.
3. Liquid -tight flexible metal conduit.
1.2 QUALITY ASSURANCE:
A. Manufacturers: Firms regularly engaged in manufacture of raceway systems of types and sizes
required, whose products have been in satisfactory use in similar service for not less than 5
years.
B. Installer's Qualifications: Firm with at least 3 years of successful installation experience on
projects with electrical raceway work similar to that required for this project.
1.3 SUBMITTALS:
A. See Section 26 05 00 Common Work Results for Electrical for Submittal requirements.
Supplemental information is listed within this section.
B. Product Data: Submit manufacturer's technical product data, including specifications and
installation instructions, for each type of raceway system required. Include data substantiating
that materials comply with requirements.
C. Shop Drawings: Submit dimensioned drawings of surface metal raceway systems showing
layout of raceways and fittings, spatial relationships to associated equipment, and adjoining
raceways, if any. Show connections to electrical power panels and feeders.
PART 2 - PRODUCTS
2.1 MANUFACTURERS:
A. Subject to compliance with requirements, provide products by the following:
1. PVC Coated:
a. Rob Roy
b. Perma Cote
C. OCAL
d. Calbond
2. EMT Conduit:
a. Allied
b. Republic
C. Triangle
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-1
SCLH Wheat Ridge Clinic X -Ray Replacement
d. LTV
e. Western Tube & Conduit
3. Steel Fittings:
a. O/Z Gedney
b. Raco
C. Appleton
d. EPT
e. Midwest
f. Picoma
g. Steel City
4. Conduit Bodies:
a. O/Z Gedney
b. Killark
C. Regal
d. Appleton
e. Crouse Hinds
2.2 METAL CONDUIT AND TUBING:
A. Electrical Metallic Tubing (EMT):
12/08/17
1. Conduit: Galvanized steel tubing.
2. Fittings: Steel compression fittings for rain -tight and concrete -tight applications. Steel
set -screw for all other connections. Set -screw quick fit type for 2-1/2 inches and larger
may be used. Bushings shall be threaded and have nylon insulated throat or nylon
bushing.
B. Flexible Metal Conduit:
1. Conduit: Continuous spiral wound, interlocked, zinc -coated steel, approved for
grounding.
2. Fittings: Zinc coated, malleable iron. Straight connector shall be one-piece body, female
end with clamp and deep slotted machine screw for securing conduit, and threaded male
end provided with a locknut. Angle connectors shall be two piece body with removable
upper section, female end with clamp and deep slotted machine screw for securing
conduit, and threaded male end provided with a locknut. All fittings shall be terminated
with threaded bushings having nylon insulated throats.
C. Liquid -Tight Flexible Metal Conduit:
1. Conduit: Continuous spiral wound, interlocked zinc -coated steel with polyvinyl chloride
(PVC) jacket, approved for grounding.
2. Fittings: Zinc coated malleable iron. Straight and angle connectors shall be the same as
used with flexible metal conduit but shall be provided with a compression type steel
ferrule and neoprene gasket sealing rings.
2.3 CONDUIT BODIES:
A. General: Types, shapes and sizes, as required to suit individual applications and NEC
requirements. Provide matching gasketed covers secured with corrosion -resistant screws.
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-2
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
B. Metallic Conduit and Tubing: Use malleable iron conduit bodies. Use bodies with threaded
hubs for threaded raceways and in hazardous locations.
C. Nonmetallic Conduit: Use nonmetallic conduit bodies.
2.4 CONDUIT SIZES:
A. Conduit sizes shall be as shown on the drawings. If the conduit size is not given on the
drawings, the conduit shall be sized in accordance with NEC based on the number of
conductors enclosed plus a parity sized equipment ground conductor and be subject to the
following minimum sizes:
EMT Conduit: 3/4 inch for all runs except lighting switch legs, 277 volt lighting branch
circuits, temperature control and fire alarm which may be 1/2inch.
Flexible and Liquid -Tight Flexible Conduit: 1/2inch for all runs.
Conduits used for home runs shall contain only the conductors for the circuits indicated
on the drawings. Combining multiple home runs into a single conduit will not be
permitted.
PART 3 - EXECUTION
3.1 INSPECTION:
A. Examine areas and conditions under which raceways are to be installed, and substrate which
will support raceways. Notify Contractor in writing of conditions detrimental to proper completion
of the work. Do not proceed with work until unsatisfactory conditions have been corrected in
manner acceptable to Installer.
3.2 CONDUIT SCHEDULE:
A. X -Ray equipment connections: PVC jacketed liquid -tight flexible metallic conduit with liquid tight
connectors from local pull box to equipment.
B. Raceways in all other areas shall be electrical metallic tubing unless otherwise noted.
C. Rework or extensions of existing conduit shall include the use of similar materials to the existing
conduit type unless otherwise noted.
3.3 INSTALLATION OF CONDUITS:
A. General: Install electrical raceways in accordance with manufacturer's written installation
instruction, applicable requirements of NEC, and as follows:
1. Conceal all conduits unless indicated otherwise, within finished walls, ceilings, and floors.
Keep raceways at least 6 inches away from parallel runs of flues and steam or hot water
pipes. Install raceways level and square and at proper elevations.
2. Elevation of Raceway:
a. Where horizontal raceway is installed near water and steam piping, route raceway
above piping and as close to structure as possible and practical.
b. Route raceway as close to structure as possible.
3. Complete installation of electrical raceways before starting installation of conductors
within raceways.
4. Provide supports for raceways as specified elsewhere in Division 26.
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-3
SCLH Wheat Ridge Clinic X -Ray Replacement
12%08% 17
5. Prevent foreign matter from entering raceways by using temporary closure protection.
6. Make bends and offsets so the inside diameter is not effectively reduced. Unless
otherwise indicated, keep the legs of a bend in the same plane and the straight legs of
offsets parallel.
7. Use raceway fittings that are types compatible with the associated raceway and suitable
for the use and location. Install expansion fittings across all structural construction joints
and expansion/deflection couplings across all structural expansion joints.
8. Run raceways parallel and perpendicular to building elements and other equipment with
a minimum of bends in the shortest practical distance considering the type of building
construction and obstructions except as otherwise indicated.
9. Install exposed raceways parallel and perpendicular to nearby surfaces or structural
members and follow the surface contours as much as practical.
10. Run exposed and parallel raceways together. Make bends in parallel runs from the same
center line so that the bends are parallel. Factory elbows may be used only where they
can be installed parallel. In other cases provide field bends for parallel raceways.
11. Make raceway joints tight. Where joints cannot be made tight, use bonding jumpers to
provide electrical continuity of the raceway system. Make raceway terminations tight.
Where terminations are subject to vibration, use bonding bushings or wedges to assure
electrical continuity. Where subject to vibration or dampness, use insulating bushings to
protect conductors. Joints in non-metallic conduits shall be made with solvent cement in
strict accordance with manufacturer's recommendations.
12. Tighten set screws of thread less fittings with suitable tool.
13. Terminations: Where raceways are terminated with locknuts and bushings, align the
raceway to enter squarely and install the locknuts with dished part against the box. RGC
and IMC shall be secured with double locknuts and an insulated metallic bushing. EMT
shall be secured with one locknut and shall have nylon insulated throats or threaded
nylon bushings from 1/2" to 1". 1-1/4" and above shall be metal with nylon insulated
throats. Use grounding type bushings for feeder conduits at switchboards, panelboards,
pull boxes, transformers, motor control centers, VFD's, etc.
14. Where terminating in threaded hubs, screw the raceway or fitting tight into the hub so the
end bears against the wire protection shoulder. Where chase nipples are used, align the
raceway so the coupling is square to the box, and tighten the chase nipple so no threads
are exposed.
15. Provide nylon pull string with printed footage indicators having not less than 200 pounds
tensile strength. Leave not less than 12 inches of slack at each end of the pull string.
Identify with tags at each end the origin and destination of each empty conduit and
indicate same on all empty or spare conduits on the as -built drawings.
16. Flexible Connections: Use short length (maximum of 6 feet) of flexible conduit for
recessed and semi -recessed luminaires, for equipment subject to vibration, noise
transmission, or movement; and for all motors. Use liquid -tight flexible conduit in wet
locations. Install separate ground conductor across flexible connections. Where PVC
conduit/couplings have been approved for exterior use and are exposed to sunlight,
provide UV rated PVC coatings or protect with 2 coats of water based latex paint that is
chemically compatible with the PVC products. Color selection shall be by Architect.
17. Ream the ends of all cut and/or threaded conduit. Ends shall be cut square.
18. Conduits shall not cross pipe shafts or ventilation duct openings. Where conduits must
penetrate air -tight spaces or plenums, seal around the conduit with a mastic acceptable
to the Architect/Engineer.
19. Install an insulated ground conductor in all conduits.
20. Where individual conduits penetrate existing fire -rated walls and floors, pack void around
conduit with fire rated insulation and seal opening around conduit with UL listed foamed
silicone elastomer compound. Where conduits penetrate exterior walls, new floors, or
roof, provide pipe sleeve one size larger than conduit, pack void around conduit with fire
rated insulation, and seal opening around conduit with UL listed foam silicone elastomer
compound.
21. Provide separate raceway systems for each of the following:
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-4
SCLH Wheat Ridge Clinic X -Ray Replacement
a. Lighting
b. Power Distribution
C. Communications and Data
d. Emergency Systems
a) Lighting
b) Power Distribution
2) Essential Electrical Systems in Health Care Facilities
a) Life Safety branch
b) Critical branch
c) Equipment branch
e. UPS
f. Fire Alarm
g. Temperature Control
12/08/17
22. Paint new exposed conduits to match existing exposed conduits where installed in areas
with existing painted conduits or where otherwise indicated.
B. Install labeling as required in Division 26 section - "Electrical Identification".
3.4 ADJUSTING AND CLEANING:
A. Upon completion of installation of raceways, inspect interiors of raceways; clear all blockages
and remove burrs, dirt and construction debris.
END OF SECTION 26 05 33
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-5
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
SECTION 26 05 34 CABINETS, BOXES, AND FITTINGS
PART 1 - GENERAL r
1.1 SUMMARY:
A. This section includes cabinets, boxes, and fittings for electrical installations and certain types of
electrical fittings not covered in other sections. Types of products specified in this section
include:
1. Outlet and device boxes
2. Pull and junction boxes
B. Conduit -body -type electrical enclosures and wiring fittings are specified in the Division 26
Section on Raceways.
1.2 DEFINITIONS:
A. Device Box: An outlet box designed to house a receptacle device or a wiring box designed to
house a switch.
B. Enclosure: A box, case, cabinet, or housing for electrical wiring or components.
C. Outlet Box: A wiring enclosure where current is taken from a wiring system to supply utilization
equipment.
D. Wiring Box: An enclosure designed to provide access to wiring systems or for the mounting of
indicating devices or switches for controlling electrical circuits.
1.3 SUBMITTALS:
A. See Section 26 05 00 Common Work Results for Electrical for Submittal requirements.
Supplemental information is listed within this section.
PART2-PRODUCTS
2.1 MANUFACTURERS:
A. Manufacturers: Subject to compliance with requirements, provide products by the following:
1. Boxes and Fittings:
a. OZ/Gedney.
b. Cooper Industries, Inc.
C. Killark Electric Mfg. Co.
d. Adalet-PLM.
e. Robroy Industries, Inc.
f. Spring City Electrical Mfg. Co.
g. Appleton
2.2 CABINETS, BOXES, AND FITTINGS, GENERAL:
A. Electrical Cabinets, Boxes, and Fittings: Of indicated types, sizes, and NEMA enclosure
classes. Where not indicated, provide units of types, sizes, and classes appropriate for the use
CABINETS, BOXES, AND FITTINGS 260534-1
SCLH Wheat Ridge Clinic X -Ray Replacement
12/08/17
and location. Provide all items complete with covers and accessories required for the intended
use. Provide gaskets for units in damp or wet locations.
2.3 MATERIALS AND FINISHES:
A. Sheet Steel: Flat -rolled, code -gage, galvanized steel.
B. Fasteners for General Use: Corrosion resistant screws and hardware including cadmium and
zinc plated items.
C. Exterior Finish: Gray baked enamel for items exposed in finished locations except as otherwise
indicated.
2.4 METAL OUTLET, DEVICE, AND SMALL WIRING BOXES:
A. General: Conform to UL 514A, "Metallic Outlet Boxes, Electrical," and UL 514B, "Fittings for
Conduit and Outlet Boxes." Boxes shall be of type, shape, size, and depth to suit each location
and application.
B. Steel Boxes: Conform to NEMA OS 1, "Sheet Steel Outlet Boxes, Device Boxes, Covers, and
Box Supports." Boxes shall be sheet steel with stamped knockouts, threaded screw holes and
accessories suitable for each location including mounting brackets and straps, cable clamps,
exterior rings and fixture studs.
2.5 PULL AND JUNCTION BOXES:
A. General: Comply with UL 50, "Electrical Cabinets and Boxes", for boxes over 100 cubic inches
volume. Boxes shall have screwed or bolted on covers of material same as box and shall be of
size and shape to suit application.
B. Steel Boxes: Sheet steel with welded seams. Where necessary to provide a rigid assembly,
construct with internal structural steel bracing.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL:
A. Locations: Install items where indicated and where required to suit code requirements and
installation conditions.
B. Cap unused knockout holes where blanks have been removed and plug unused conduit hubs.
C. Support and fasten items securely in accordance with Division 26 Section on Supporting
Devices.
D. Sizes shall be adequate to meet NEC volume requirements, but in no case smaller than sizes
indicated.
E. Remove sharp edges where they may come in contact with wiring or personnel.
3.2 APPLICATIONS:
A. Outlet Boxes and Fittings: Install outlet and device boxes and associated covers and fittings of
materials and NEMA types suitable for each location and in conformance with the following
requirements:
CABINETS, BOXES, AND FITTINGS 260534-2
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
1. Interior Dry Locations: Sheet steel, NEMA Type 1.
B. Pull and Junction Boxes: Install pull and junction boxes of materials and NEMA types suitable
for each location except as otherwise indicated.
3.3 INSTALLATION OF OUTLET BOXES:
A. Outlets at Windows and Doors: Locate close to window trim. For outlets indicated above doors
center outlets above the door opening except as otherwise indicated.
B. Column and Pilaster Locations: Locate outlet boxes for switches and receptacles on columns
or pilasters so the centers of the columns are clear for future installation of partitions.
C. Locations in Special Finish Materials: For outlet boxes for receptacles and switches mounted in
desks or furniture cabinets or in glazed tile, concrete block, marble, brick, stone or wood walls,
use rectangular shaped boxes with square corners and straight sides. Install such boxes
without plaster rings. Saw cut all recesses for outlet boxes in exposed masonry walls.
D. Gasketed Boxes: At the following locations use malleable or cast metal, threaded hub type
boxes with gasketed weatherproof covers:
1. Exterior locations.
2. Where surface mounted on unfinished walls, columns or pilasters. (Cover gaskets may
be omitted in dry locations).
3. Where exposed to moisture laden atmosphere.
4. At food preparation equipment within four ft. of steam connections.
5. Where indicated.
E. Mounting: Mount outlet boxes for switches with the long axis vertical or as indicated. Mount
boxes for receptacles vertically, except above counter receptacles to be mounted horizontally.
Three or more gang boxes shall be mounted with the long axis horizontal. Locate box covers or
device plates so they will not span different types of building finishes either vertically or
horizontally. Locate boxes for switches near doors on the side opposite the hinges and close to
door trim, even though electrical floor plans may show them on hinge side. Provide far side box
supports, for electrical switch boxes installed on metal studs and provide stud to stud support
for electrical receptacle boxes installed on metal studs.
F. Cover Plates for Surface Boxes: Use plates sized to box front without overlap.
G. Protect outlet boxes to prevent entrance of plaster, and debris. Thoroughly clean foreign
material from boxes before conductors are installed.
H. Existing Outlet Boxes: Where extension rings are required to be installed, drill new mounting
holes in the rings to align with the mounting holes on the existing boxes where existing holes
are not aligned.
Back to back outlet boxes are not permitted. Separate boxes a minimum of 6 inches in
standard walls and 24 inches in acoustical walls.
3.4 INSTALLATION OF PULL AND JUNCTION BOXES:
A. Box Selection: For boxes in main feeder conduit runs, use sizes not smaller than 8 inches
square by 4 inches deep. Do not exceed 6 entering and 6 leaving raceways in a single box.
Quantities of conductors (including equipment grounding conductors) in pull or junction box
shall not exceed the following:
CABINETS, BOXES, AND FITTINGS 260534-3 —
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
Size of Maximum no. of
Largest Conductors Conductors in
in Box Box
No. 4/0 AWG
30
250 MCM
20
500 MCM
15
Over 500 MCM
10
B. Cable Supports: Install clamps, grids, or devices to which cables may be secured. Arrange
cables so they may be readily identified. Support cable at least every 30 inches inside boxes.
C. Mount pull boxes in inaccessible ceilings with the covers flush with the finished ceiling.
3.5 GROUNDING:
A. Electrically ground metallic cabinets, boxes, and enclosures. Where wiring to item includes a
grounding conductor, provide a grounding terminal in the interior of the cabinet, box or
enclosure.
3.6 CLEANING AND FINISH REPAIR:
A. Upon completion of installation, inspect components. Remove burrs, dirt, and construction
debris and repair damaged finish including chips, scratches, abrasions and weld marks.
B. Galvanized Finish: Repair damage using a zinc -rich paint recommended by the tray
manufacturer.
C. Painted Finish: Repair damage using matching corrosion inhibiting touch-up coating.
END OF SECTION 26 05 34
CABINETS, BOXES, AND FITTINGS 260534-4
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
SECTION 26 05 53 — IDENTIFICATION FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY:
A. This Section includes identification of electrical materials, equipment, and installations. It
includes requirements for electrical identification components including but not limited to the
following:
1. Identification labeling for raceways, cables, and conductors.
2. Operational instruction signs.
3. Warning and caution signs.
4. Equipment labels and signs.
B. Identification required in this section shall apply to equipment furnished in Division 26 and any
other applicable Divisions including Division 23.
1.2 SUBMITTALS:
A. See Section 26 05 00 Common Work Results for Electrical for Submittal requirements.
Supplemental information is listed within this section.
B. Product Data for each type of product specified.
C. Submit schedule of identification nomenclature to be used for identification signs and labels for
each piece of equipment including, but not be limited to, the following equipment types as
specified in Division 26.
1. Cabinets and enclosures
2. Transformers
3. Panelboards
4. Disconnect switches
5. Circuit breakers and switches
6. Lighting control cabinets including dimmer cabinets.
D. Submit samples of each color, lettering style and other graphic representation required for
identification materials including samples of labels and signs.
1.3 QUALITY ASSURANCE:
A. ANSI Compliance: Comply with requirements of ANSI Standard A13.1, "Scheme for the
Identification of Piping Systems," with regard to type and size of lettering for raceway and cable
labels.
PART 2 - PRODUCTS
2.1 MANUFACTURERS:
A. Manufacturers: Subject to compliance with requirements, provide products by the following:
1. Ideal Industries, Inc.
2. LEM Products, Inc.
3. Markal Corp.
4. Panduit Corp.
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553-1
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
5. W.H.Brady, Co.
6. 3M Company
2.2 ELECTRICAL IDENTIFICATION PRODUCTS:
A. Provide colored Adhesive Marking Tape for banding Wires and Cables: Self-adhesive vinyl tape
not less than 3 mils thick by 1 inch to 2 inches in width. Make each color band completely
encircling cables, at penetrations of walls and floors, at each junction box and at 20 -foot
maximum intervals in straight runs.
B. Wire/Cable Designation Tape Markers: Vinyl or vinyl -cloth, self-adhesive, wraparound,
cable/conductor markers with preprinted numbers and letter.
C. Engraved, Plastic -Laminated Labels, Signs and Instruction Plates: Engraving stock melamine
plastic laminate, 1/16 inch minimum thick for signs up to 20 square inches, or 8 inches in length;
1/8 inch thick for larger sizes. Engraved legend in white letters on black face for normal and
white letters on red face for emergency, black letters on yellow face for UPS and punched for
mechanical fasteners. Where required for ground connections, provide engraved legend in
white letters on green face.
D. Fasteners for Plastic -Laminated and Metal Signs: Self -tapping stainless steel screws or
number 10/32 stainless steel machine screws with nuts and flat and lock washers.
E. Cable Ties: Fungus -inert, self -extinguishing, one-piece, self-locking nylon cable ties, 0.18 -inch
minimum width, 50 Ib minimum tensile strength, and suitable for a temperature range from
minus 50 degrees F to 350 degrees F. Provide ties in specified colors when used for color
coding.
F. Adhesive Marking Tape for Device Cover Plates: 3/8 inch Kroy tape or Brother labels with 3/16
inch minimum height letters. Tape shall have black letters on clear background for normal and
red letters on clear background for emergency. Embossed Dymo-Tape labels are not
acceptable.
PART 3 - EXECUTION
3.1 INSTALLATION:
A. Lettering and Graphics: Coordinate names, abbreviations, colors, and other designations used
in electrical identification work with corresponding designations specified or indicated. Install
numbers, lettering, and colors as approved in submittals and as required by code.
B. Install identification devices in accordance with manufacturer's written instructions and
requirements of NEC.
C. Sequence of Work: Where identification is to be applied to surfaces that require finish, install
identification after completion of finish work.
D. Identify Junction, Pull and Connection Boxes: Identification of systems and circuits shall
indicate system voltage and identity of contained circuits on outside of box cover. Use self-
adhesive marking tape labels at exposed locations and indelible black marker at concealed
boxes.
E. Circuit Identification: Tag or label conductors as follows:
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553-2
SCLH Wheat Ridge Clinic X -Ray Replacement
12/08/17
1. Future Connections: Conductors indicated to be for future connection or connection
under another contract with identification indicating source and circuit numbers.
2. Multiple Circuits: Where multiple branch circuits, control wiring or communications/signal
conductors are terminated or spliced in a box or enclosure, label each conductor or cable
with circuit number. For control and communications/signal wiring, use wire/cable
marking tape at terminations in wiring boxes, troughs and control cabinets. Use
consistent letter/number conductor designations throughout on wire/cable marking tapes.
3. Match identification markings with designations used in panelboards shop drawings,
Contract Documents, and similar previously established identification schemes for the
facility's electrical installations.
F. Apply warning, caution and instruction signs and stencils as follows:
Install warning, caution or instruction signs where required by NEC, where indicated, or
where reasonably required to assure safe operation and maintenance of electrical
systems and of the items to which they connect. Install engraved plastic -laminated
instruction signs with approved legend where instructions or explanations are needed for
system or equipment operation. Install butyrate signs with metal backing for outdoor
items.
G. Install equipment/system circuit/device identification as follows:
Apply equipment identification labels of engraved plastic -laminate on each major unit of
electrical equipment in building, including central or master unit of each electrical system.
This includes communication/signal/alarm systems, unless unit is specified with its own
self-explanatory identification. Text shall match terminology and numbering of the
Contract Documents and shop drawings. Apply labels for each unit of the following
categories of electrical equipment.
a. Access doors and panels for concealed electrical items.
b. Pushbutton stations.
C. Transformers.
H. Apply circuit/control/item designation labels of engraved plastic laminate for disconnect
switches, breakers, pushbuttons, pilot lights, motor control centers, and similar items for power
distribution and control components above, except panelboards and alarm/signal components,
where labeling is specified elsewhere.
I. For panelboards, provide updated framed, typed circuit schedules (label all spares and spaces
in pencil) with explicit description and identification of items controlled by each individual
breaker.
J. Install labels at locations as required and at locations for best convenience of viewing without
interference with operation and maintenance of equipment.
K. Provide tape labels for identification of individual receptacles and light switch wall -plates.
Locate tape on front of plate and identify panel/branch circuit serving the receptacle. Provide
tape labels for identification of individual switches or thermal overload switches which serve as
equipment disconnects. Locate the tape on the front of the cover -plate and identify
panel/branch circuit serving the equipment.
END OF SECTION 26 05 53
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553-3
J
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
SECTION 26 05 83 —WIRING CONNECTIONS
PART 1 - GENERAL
1.1 SUMMARY:
A. Extent of electrical connections for equipment is indicated by drawings and schedules.
Electrical connections are hereby defined to include connections used for providing electrical
power to equipment.
B. Applications of electrical power connections specified in this section include the following:
1. To X -Ray equipment.
2. To lighting equipment.
3. From push buttons to equipment requiring electrical connection
4. Other connections as shown.
1.2 QUALITY ASSURANCE:
A. Manufacturers: Firms regularly engaged in manufacture of electrical connectors and terminals,
of types and ratings required, and ancillary connection materials, including electrical insulating
tape, soldering fluxes, and cable ties, whose products have been in satisfactory use in similar
service for not less than 5 years.
B. Installer's Qualifications: Firms with at least 2 years of successful installation experience with
projects utilizing electrical connections for equipment similar to that required for this project.
1.3 SUBMITTALS:
A. See Section 26 05 00 Common Work Results for Electrical for Submittal requirements.
Supplemental information is listed within this section.
B. Product Data: Submit manufacturer's data on electrical connections for equipment products
and materials. All mechanical and plumbing equipment shall be coordinated with unit nameplate
information per the actual nameplate to be included on the equipment. As a minimum,
information shall include: Operating Voltage; MCA (Min. circuit amperes); FLA (Full load
amperes); MFS (Max. fuse size) or MOP (Max. overcurrent protection); and SCCR (Short
Circuit Current Rating) and shall match electrical equipment and protection/distribution sizes
and be rated for available short circuit currents as shown on the drawings. Bracing for
equipment shall be provided at incoming terminals and as an option throughout the equipment
for the available fault current or downstream equipment and devices shall be protected by
current limiting fuses.
1.4 DEFINITIONS:
A. Load voltage wiring shall be defined as:
Conduit and wiring required to carry power to motors and other equipment or devices.
Wiring from control devices to equipment that carry power to drive that equipment such
as line voltage thermostats, etc., shall be included as load voltage wiring. Wiring that
provides power to control panels, control transformers, control relays, time clocks, etc.,
shall also be included as load voltage wiring.
WIRING CONNECTIONS 260583-1
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
1.5 DELIVERY, STORAGE, AND HANDLING:
A. Deliver electrical connection products wrapped in proper factory fabricated type containers.
B. Store electrical connection products in original cartons and protect from weather, construction
traffic and debris.
C. Handle electrical connection products carefully to prevent breakage, denting, and scoring finish.
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS:
A. Manufacturer: Subject to compliance with requirements, provide circuit and motor disconnects
by one of the following:
1. General Electric Co.
2. Eaton
3. Square D Company
4. Siemens Energy & Automation, Inc.
5. Westinghouse Electric Corp.
2.2 GENERAL:
A. Overcurrent Protective Devices (OCPDs): Provide type, rating, and features as indicated.
Comply with Division 26 Section on Low Voltage Circuit Protective Devices, with OCPDs
adapted to equipment connection installation. Tandem circuit breakers shall not be used.
Multiple breakers shall have common trip.
2.3 MATERIALS AND COMPONENTS:
A. General: For each electrical connection indicated, provide complete assembly of materials,
including but not necessarily limited to, pressure connectors, terminals (lugs), electrical
insulating tape, electrical solder, electrical soldering flux, heat -shrinkable insulating tubing, cable
ties, solderless wire -nuts, disconnect, starter, contactor, relays, etc., and other items and
accessories as needed to complete splices and terminations of types indicated.
B. Metal Conduit, Tubing and Fittings:
General: Provide metal conduit, tubing and fittings of types, grades, sizes and weights
(wall thicknesses) indicated for each type service. Provide products complying with
Division -26 section on Raceways.
C. Wires, Cables, and Connectors:
1. General: Provide wires, cables, and connectors complying with Division -26 section on
Wires and Cables.
2. Wires/Cables: Unless otherwise indicated, provide wires/cables (conductors) for
electrical connections which match, including sizes, ratings, and material of wires/cables
which are supplying electrical power.
3. Connectors and Terminals: Provide electrical connectors and terminals which mate and
match, including sizes and ratings, with equipment terminals and are recommended by
equipment manufacturer for intended applications.
WIRING CONNECTIONS 260583-2
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
4. Electrical Connection Accessories: Provide electrical insulating tape, heat -shrinkable
insulating tubing and boots, electrical solder, electrical soldering flux, wire -nuts and cable
ties as recommended for use by accessories manufacturers for type services indicated.
2.4 CIRCUIT AND MOTOR DISCONNECT SWITCHES:
A. General: Provide circuit and motor disconnect switches in types, sizes, duties, features, ratings,
and enclosures as indicated. All equipment with maximum fuse size listed in nameplate shall
have fusible disconnect switch provided. Provide NEMA 1 enclosure. For outdoor switches and
switches indicated as weatherproof, provide NEMA 3R enclosures with rain -tight hubs. For
motor and motor starter disconnects, provide units with horsepower ratings suitable to the
loads.
B. Fusible Switches: Provide UL type "HD" 100 percent duty rated switches, with fuses of classes
and current ratings indicated. Where current limiting fuses are indicated, provide switches with
non -interchangeable feature suitable only for current limiting type fuses. All disconnect
switches shall be fusible unless otherwise noted.
C. Non -fusible Disconnects: Provide UL type "HD" 100 percent duty rated switches of classes and
current ratings as indicated.
D. Double -Throw Switches: Provide heavy duty switches of classes and current ratings as
indicated.
E. Switches for Classified (Hazardous) Locations: Provide heavy duty switches, with UL labels and
listings for hazardous location classifications in which installed.
F. Accessories:
1. Electrical Interlocks: Provide number and arrangement of interlock contacts in switches
as indicated or required.
2. Special Enclosure Material: Provide special enclosure material as follows for switches
indicated:
a. Stainless Steel Type 304: For NEMA Type 4.
b. Molded Fiberglass Reinforced Plastic: For NEMA Type 4x.
C. Heavy Cast Aluminum: For hazardous locations. NEMA Types 7 through 9.
3. Handles shall be lockable in open and closed position without modification.
4. Disconnect switches provided in the motor feeders between a VFD and the motor shall
be provided with auxiliary contacts at the disconnect that de -energizes power to the VFD.
PART 3 - EXECUTION
3.1 INSPECTION:
A. Inspect area and conditions under which electrical connections for equipment are to be installed
and notify Contractor in writing of conditions detrimental to proper completion of the work. Do
not proceed with the work until unsatisfactory conditions have been corrected in a manner
acceptable to Installer.
3.2 INSTALLATION OF ELECTRICAL CONNECTIONS:
A. Furnish, set in place, and wire (except as may be otherwise indicated) All equipment
connections in accordance with the following schedule and in accordance with equipment
WIRING CONNECTIONS 260583-3
SCLH Wheat Ridge Clinic X -Ray Replacement
12/081 17
manufacturer's written instructions and with recognized industry practices, and complying with
applicable requirements of UL, NEC and NECA's "Standard of Installation" to ensure that
products fulfill requirements. Carefully coordinate with work performed under the Mechanical
Division of these Specifications.
B. Coordinate with other work, including wires/cables, raceway and equipment installation, as
necessary to properly interface installation of electrical connections for equipment with other
work.
C. Connect electrical power supply conductors to equipment conductors in accordance with
equipment manufacturer's written instructions and wiring diagrams. Mate and match
conductors of electrical connections for proper interface between electrical power supplies and
installed equipment.
D. Maintain existing electrical service and feeders to equipment serving occupied areas and
operational facilities, unless otherwise indicated, or when authorized otherwise in writing by
Owner, or Arch itect/Engineer. Provide temporary service during interruptions to existing
facilities. When necessary, schedule momentary outages for replacing existing wiring systems
with new wiring systems. When that "cutting over" has been successfully accomplished,
remove, relocate, or abandon existing wiring as indicated.
E. Cover splices with electrical insulating material equivalent to, or of greater insulation resistivity
rating, than electrical insulation rating of those conductors being spliced.
F. Prepare cables and wires, by cutting and stripping covering armor, jacket, and insulation
properly to ensure uniform and neat appearance where cables and wires are terminated.
Exercise care to avoid cutting through tapes which will remain on conductors. Also avoid
"ringing" copper conductors while skinning wire.
G. Trim cables and wires as short as practicable and arrange routing to facilitate inspection, testing
and maintenance.
H. Tighten connectors and terminals, including screws and bolts, in accordance with equipment
manufacturers published torque tightening values for equipment connectors. Accomplish
tightening by utilizing proper torqueing tools, including torque screwdriver, beam -type torque
wrench, and ratchet wrench with adjustable torque settings. Where manufacturer's torqueing
requirements are not available, tighten connectors and terminals to comply with torqueing
values contained in UL's 486A.
Make wiring connections in control panel or in wiring compartment of pre -wired equipment and
interconnecting wiring in accordance with manufacturer's instructions.
Install disconnect switches, controllers, control stations, and control devices such as limit
switches and temperature switches as indicated or per manufacturer's instructions.
K. Provide circuit disconnect switches as indicated and where required by Code. Comply with
switch manufacturers printed installation instructions. Install within sight of equipment.
3.3 FIELD QUALITY CONTROL:
A. Upon completion of installation of electrical connections, and after circuitry has been energized
with rated power source, test connections to demonstrate capability and compliance with
requirements. Correct malfunctioning units at site, then retest to demonstrate compliance.
WIRING CONNECTIONS 260583-4
SCLH Wheat Ridge Clinic X -Ray Replacement
END OF SECTION 26 05 83
12/08/17
WIRING CONNECTIONS 260583-5
SCLH Wheat Ridge Clinic X -Ray Replacement
SECTION 26 22 00 — LOW VOLTAGE TRANSFORMERS
PART 1 - GENERAL
1.1 SUMMARY:
A. This section includes general purpose and specialty dry type transformers and voltage
regulators with windings rated 600 V or less.
1.2 SUBMITTALS:
A. See Section 26 05 00 Common Work Results for Electrical for Submittal requirements.
Supplemental information is listed within this section.
12/08/17
B. Product Data: Submit manufacturer's technical product data including rated kVA, frequency,
primary and secondary voltages, percent taps, polarity, impedance and certification of
transformer performance efficiency at indicated loads, percentage regulation at 100% and 80%
power factor, no-load and full -load losses in watts, % impedance at 75 deg. C, hot -spot and
average temperature rise above 40 deg. C ambient temperature, sound level in decibels, and
standard published data.
C. Wiring diagrams from manufacturer differentiating between manufacturer -installed and
field -installed wiring.
D. Product certificates: Submit certificates signed by manufacturer of transformers certifying that
their products comply with the specified requirements.
1.3 QUALITY ASSURANCE:
A. Manufacturers: Firms regularly engaged in manufacture of transformers of types and ratings
required for this project, whose products have been in satisfactory use in similar service for not
less than 5 years.
B. Installer's Qualifications: Firm with at least 5 years of successful installation experience on
projects utilizing electrical power and distribution transformers similar to those required for this
project.
PART 2 - PRODUCTS
2.1 MANUFACTURERS:
A. Manufacturers: Subject to compliance with requirements, provide products by the following:
1. General Electric Co.
2. Square D Co.
3. Hevi-Duty Electric.
4. ITE Siemens Energy & Automation, Inc.
5. Hammond Power Solutions
2.2 TRANSFORMERS, GENERAL:
A. Transformers: Factory assembled and tested air cooled units of types specified, having
characteristics and ratings as indicated. Units shall be designed for 60 -Hz service.
B. Cores: Grain oriented, non -aging silicon steel.
LOW VOLTAGE TRANSFORMERS 262200-1
SCLH Wheat Ridge Clinic X -Ray Replacement
C. Coils: Continuous windings without splices except for taps.
D. Internal Coil Connections: Brazed or pressure type.
2.3 GENERAL PURPOSE, DRY -TYPE TRANSFORMERS:
A. Comply with NEMA Standard ST 20 "Dry -Type Transformers for General Applications."
B. Transformers shall have the following features and ratings:
12/08/17
Enclosure: Indoor, ventilated. Use the following where specifically shown or appropriate:
a. Enclosure: Indoor, ventilated, drip proof.
2. Insulation Class: 220 deg. C class
Insulation Temperature Rise: Insulation Temperature Rise: 115 deg. C maximum rise
above 40 deg. C.
3. Windings:
a. 2 -winding type, three phase transformers shall use one coil per phase in primary
and secondary. Conductors shall be individually insulated, as small in size as
possible, and transposed when necessary to minimize eddy current losses. The
primary winding shall be of sufficient size to limit temperature rise to its rated value
even with circulating 3rd harmonic current.
b. Provide aluminum windings.
C. Windings shall be delta-wye with 300 lagging phase shift to match ANSI standard,
unless noted otherwise.
4. Sound Level: Minimum of 3 dB less than NEMA ST 20 standard sound levels for
transformer type and size indicated when factory tested in accordance with that standard.
5. Taps: For transformers 3 kVA and larger, full capacity taps in high-voltage winding as
follows:
a. Greater than 15 kVA through and including 500 kVA: Six 2-1/2 percent taps, 2
above and 4 below rated high-voltage.
6. BIL: 10kV for all windings.
7. Secondary Neutral: Twice the ampacity of the secondary phase conductors.
8. Core Flux Density: Maintained below saturation point to prevent core saturation caused
by harmonics even with a 10% primary overvoltage.
9. Efficiency: Comply with NEMA standard TP -1 and after Jan. 1, 2016 DOE Energy
Efficiency standards.
C. Accessories: The following accessory items are required where indicated:
1. Wall mounting brackets: Manufacturers standard brackets for transformers sized up to
75 kVA where wall mounting is indicated.
2. Fungus Proofing: Permanent fungicidal treatment for coil core.
2.4 BUCK -BOOST TRANSFORMERS:
A. Comply with NEMA Standard ST 1 "Specialty Transformers", and UL Standard 506, "Specialty
Transformers."
B. Ratings: As indicated, and for continuous duty.
LOW VOLTAGE TRANSFORMERS 262200-2
r
SCLH Wheat Ridge Clinic X -Ray Replacement 121108!17 - -
C. Type: Self -cooled, dry type, connected as autotransformers to provide the percentage of buck
or boost indicated.
g
D. Enclosure: Suitable for the location indicated.
E. Sound Level: Minimum of 3 dB less than NEMA St 1 standard for transformer of type and size
indicated when factory tested in accordance with that standard.
PART 3 - EXECUTION
3.1 INSTALLATION:
A. Arrange equipment to provide adequate spacing for cooling air circulation.
B. Identify transformers in accordance with Division 26 Section on Electrical Identification.
C. Tighten electrical connectors and terminals in accordance with manufacturers published
torque -tightening values. Where manufacturer's torque values are not indicated, use those
specified in UL 486A for copper and UL 486B for aluminum.
D. Install transformers as indicated, complying with manufacturer's written instructions, applicable
requirements of NEC, NESC, NEMA, ANSI and IEEE standards, and in accordance with
recognized industry practices to ensure that products fulfill requirements.
E. Install units on vibration mounts; comply with manufacturer's indicated installation method, if
any. Vibration mounts shall be Neoprene seismic isolator series RSM as manufactured by
Vibration Mountings and Control s/Aerofl ex.
F. Where indicated, suspend transformer from structure using transformer mounting detail as
shown on the drawings.
3.2 GROUNDING:
A. Ground transformers and tighten connections to comply with tightening torques specified in UL
Standard 486A.
3.3 FIELD QUALITY CONTROL:
A. Tests shall conform to National Electrical Testing Association (NETA) Standard ATS,
"Acceptance Testing Specifications for Electrical Power Distribution Equipment and Systems,"
and the following:
1. Test Objectives: To assure transformer installation is operational within industry and
manufacturer's tolerances, is installed in accordance with Contract Documents, and is
suitable for energizing.
2. Procedures: Upon satisfactory completion of tests, attach a label to tested components.
3. Schedule tests and notify Engineer/Architect at least one week in advance of schedule
and of test commencement.
observations and tests. Report defective materials
4. Reports: Provide a written report of
and workmanship and retest corrected defective items.
5. Submit written test reports to the Engineer/Architect.
6. Testing for transformers shall include verification of manual and/or automatic switching,
protection, or control devices, insulation resistance test, taps verification, excitation test,
and audible sound level tests.
LOW VOLTAGE TRANSFORMERS 262200-3
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
7. Provide tap voltage readings and adjust tap connections for appropriate secondary
voltage. Include tap settings and voltage readings in test report.
3.4 ADJUSTING AND CLEANING:
A. Upon completion of installation, inspect interiors and exteriors of accessible components.
Remove paint splatters and other spots, dirt, and construction debris. Touch up scratches and
mars of finish to match original finish.
B. Adjust transformer taps to provide optimum voltage conditions at utilization equipment.
3.5 PROTECTION:
Temporary Heating: Apply temporary heat in accordance with manufacturer's
recommendations within enclosure of each transformer throughout periods during which
equipment is not in a space that is continuously under normal control of temperature and
humidity.
END OF SECTION 26 22 00
LOW VOLTAGE TRANSFORMERS 262200-4
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
SECTION 26 28 00 - LOW -VOLTAGE CIRCUIT PROTECTIVE DEVICES
PART 1 - GENERAL
1.1 SUMMARY:
A. This section includes overcurrent protective devices (OCPD's) rated 600 V and below and
switching devices commonly used with them.
1.2 DEFINITIONS:
A. Overcurrent Protective Device (OCPD): A device operative on excessive current that causes
and maintains the interruption of power in the circuit it protects.
B. Ampere -Squared -Seconds: An expression of available thermal energy resulting from current
flow. With regard to current -limiting fuses and circuit breakers, the ampere -squared -seconds
during fault current interruption represents the energy allowed to flow before the fuse or breaker
interrupts the fault current within its current limiting range.
1.3 SUBMITTALS:
A. See Section 26 05 00 Common Work Results for Electrical for Submittal requirements.
Supplemental information is listed within this section.
B. Product data for fuses, fusible switches, circuit breakers, and OCPD accessories specified in
this Section, including descriptive data and time -current curves for all protective devices and
let -through current curves for those with current limiting characteristics. Include coordination
charts and tables and related data.
C. Submit documentation of compliance with Code and Specification requirements for circuit
protective devices including but not limited to SCCR, Listings for use with downstream
breakers/fuses and equipment where required, Ground Fault protection; Arc Flash reduction for
breakers above 1200A; Surge Protection; Metering; Relaying; etc.
1.4 QUALITY ASSURANCE:
A. Manufacturers: Firms regularly engaged in manufacture of overcurrent protective devices of
types, sizes, and ratings required, whose products have been in satisfactory use in similar
service for not less than 5 years.
B. Each type of OCPD shall be the product of a single manufacturer.
PART 2 - PRODUCTS:
2.1 MANUFACTURERS:
A. Manufacturers: Subject to compliance with requirements, provide products by the following:
Molded -Case Circuit Breakers:
a. General Electric Co.
b. Square D Co.
C. Siemens Energy & Automation, Inc.
d. Eaton
LOW -VOLTAGE CIRCUIT PROTECTIVE DEVICES 262800-1
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
2. When mounting overcurrent protective devices in switchboards, switchgear, panelboards,
MCC's, etc., provide equipment of same manufacturer as equipment into which they are
being mounted.
2.2 OVERCURRENT PROTECTIVE DEVICES (OCPDS), GENERAL:
A. General: Provide OCPDs in indicated types, as integral components of panelboards,
switchboards, motor control centers, and other related equipment; and also as individually
enclosed and mounted single units.
B. Enclosures: NEMA 250 "Enclosures for Electrical Equipment (1,000 Volts Maximum)."
C. Where OCPD's are to be installed in existing panelboards, switchboards, and motor control
centers, they shall be of the same manufacture and type as those existing in the equipment. If
this is not possible, provide devices which are compatible with the existing equipment and when
installed will not void the U.L. label or reduce the short circuit rating of the equipment.
D. All overcurrent devices shall be individually rated for the available fault current unless otherwise
noted. Series ratings of equipment will only be allowed where specifically called out.
2.3 MOLDED -CASE CIRCUIT BREAKERS:
A. General: UL 489, "Molded Case Circuit Breakers and Circuit Breaker Enclosures," and NEMA
AB 1, "Molded Case Circuit Breakers."
B. Construction: Provide bolt -in type, except breakers 225 -ampere frame size and larger which
may be plug-in type if held in place by positive locking device requiring mechanical release for
removal.
C. Characteristics: Indicated frame size, trip rating, number of poles, and a short-circuit
interrupting capacity rating as indicated or required to match existing devices or equipment.
D. Tripping Device: Quick -make, quick -break toggle mechanism with inverse -time delay and
instantaneous overcurrent trip protection for each pole. Trip unit to be interchangeable within
frame sizes for breakers 200 amperes or larger. Breakers 150 amperes and above shall have
adjustable trip selection for trip units. All 120/208 volt rated breakers shall be rated and labeled
"High Magnetic".
E. Adjustable Instantaneous Trip Devices: Factory adjusted to low -trip -setting current values.
Provide adjustable instantaneous trip devices for each circuit breaker supplying individual motor
loads and where indicated.
F. Enclosure for Switchboard or Panelboard Mounting: Suitable for panel mounting in switchboard
or panelboards where indicated.
G. Enclosure for Independent Mounting: NEMA Type 1 enclosure, except as otherwise indicated
or required to suit environment where located.
2.4 OCPD ACCESSORIES:
A. Provide shunt -trip devices for Circuit breakers where required or indicated. Arrange to trip
breaker from an external source of power through a control switch or relay contact.
LOW -VOLTAGE CIRCUIT PROTECTIVE DEVICES 262800-2
SCLH Wheat Ridge Clinic X -Ray Replacement 12/08/17
B. Lock -Out Devices: Provide padlocking provisions on each overcurrent protective device,
lockable in the open or closed position. Provide 3 sets of lockout/tagout devices for each type
of breaker or switch provided. Include tags, locks and all accessories necessary.
PART 3 - EXECUTION:
3.1 INSTALLATION:
A. Independently Mounted OCPDs: Locate as indicated and install in accordance with
manufacturer's written installation instructions. Install OCPDs level and plumb.
B. OCPDs and mounting accessories installed in existing equipment shall match the existing
manufacturer and be rated for the available fault current.
3.2 IDENTIFICATION:
A. Identify components in accordance with Division 26 Section on electrical identification.
3.3 CONTROL WIRING INSTALLATION:
A. Install wiring between OCPDs and control/indication devices.
3.4 CONNECTIONS:
A. Check connectors, terminals, bus joints, and mountings for tightness. Tighten field -connected
connectors and terminals, including screws and bolts, in accordance with equipment
manufacturer's published torque tightening values. Where manufacturer's torqueing
requirements are not indicated, tighten connectors and terminals to comply with tightening
torques specified in UL 486A and UL 486B.
3.5 GROUNDING:
A. Provide equipment grounding connections for individually mounted OCPD units as indicated
and as required by NEC. Tighten connectors to comply with tightening torques specified in UL
Standard 486A to assure permanent and effective grounding.
3.6 FIELD QUALITY CONTROL:
A. Reports: Prepare written reports on tests and observations. Report defective materials and
workmanship and unsatisfactory test results. Include complete records of repairs and
adjustments made. Tests shall be made on all new and existing OCPD's provided and/or
connected under this project in accordance with this section.
B. Labeling: Upon satisfactory completion of tests and related effort, apply a label to tested
components indicating test results, date, and responsible organization and person.
C. Schedule visual and mechanical inspections and electrical tests with at least one week's
advance notification.
D. Upon completing installation of the system, perform the following tests on all new equipment
and existing equipment as indicated on the drawings:
Visual and mechanical inspection: Include the following inspections and related work.
LOW -VOLTAGE CI 'E DEVICES 262800-3
b - 00 8Z 9Z
S301/13a 3AIiO3iM:Jd 11f102jIO 30b'l7IOn-MO_1
00 8Z 9Z NOUOEIS d0 aN3
•uO!jeO!j!jou aouenpe ,SAep uanas jseal le ql!m bu!ulejl alnpagoS •0
•sainpaooid aoueueju!ew pue uo!jejado juawd!nba uo-spueq
pue bu!umil wooisselo gloq apnloul •suo!leo!j!oads asegj jo uo!loaS jnoaso10 joefoid aqj ul
japun pa!j!oads se eoueuelu!ew pue uo!jejado ui bu!u!eal jo Aep jleq auo jo wnwlu!w e lonpuo0 •0
•lauuosaad eoueuaju!ew s,aaunn0 u!ejl pue
s,adOO ajejjsuowaQ Up// •lauuosiad aoueueju!ew s,jaumo uleJl pue s,adOO eleilsuowap
0; san!jejuasaadaj ao!nuas pazuogjne-Aaojoej jo sao!nuas agj joj Aed pue abuejjy :6upleil d
:NOIlt'd1SNOW34 8•£
•gs!u!j leul6uo gojew of gs!u!j jo siew pue sagolejos do gonol •sugap pue
'lip 'slods jagJ0 pue saapjelds lined anowa�{ s,ddOO loodsu! 'uo!jellejsu! jo uo!laldwoo uodn y
JNINb3-10 LT
-law aae sluawaalnbai paipoads jegl sisal wajsAs aql Aq Ajuan •uo!jez!ue6jo bullsal Aq s4d00
jo 6u!lsa19J ep!noad pue suo!lenaasgo pue sisal Aq pa!pluap! salouapjap loaaao0 :jsaja�tl •0
•saO!nap dul-lungs jo uo!lejado
Ajuan Oj 'SAelaa a6ejlon-aapun ao jInej puno.ib se Bons saOlnap anlloajoad /ie!l!xne ajenljoy
•saO!nap dul-elgelsnfpe jo sbu!llas leu!j aoj sluawlsnfpe aNeW •3
•sanlen uO!jen!lOe JO bu!dduj aqj jo uo!leupialap
ajefnooe elgeue II!M go!gm sanlen le fxal!noa!o jagjo pue /jlnej punoj6/luaaanOJano
olui sluaajno paaalow Aloleinooe jo uo!lonpo.ilui fxq uoljeaado Aelaa Ajuan •o
•sl!noj!o jo sisal Al!nulluoo a� eW •q
•sl!no.no loiluoo pue 'aapaaj 'Alddns
6ulloeuuoo pue 'slueuodwoo 'sasnq adOO jo sisal aouels!saJ uollelnsu! G� en e
:suo!lonjjsui
s,aainjoejnuew ql!m eouepa000e ui sisal buimolloj aql wjojaad :slsal leoulool3 Z
•s,ad00 elq!snj ui sbu!lej pue sadAl asnj jado.id jo uollellelsul AJ!JGA •j
•sleuajew pue spoglaw pano.idde s,aainjoejnuew bu!sn s,adOO uea10 •a
•sanlen anbiol jadoid joj suo!lon.ilsui s,aajnloejnuew of jaja�j
gouaim anb.iol palejq!leo gl!m s,4dOO JO suo!loauuoo leouloala jo ssaujg6!j �IoagO p
•Ienuew uollonajsui s,aajnloejnuew ql!m aouepj000e u1 saOinap algejado
aaglo pue slueuodwoo leo!uegoew Ile jo sisal leuo!leaado waojaad pue as!oaax3 •o
•wej6e!p Gull 016u!s juauno ql!m eouegdwoo
aleldoweu pue '6u!Iagel TL2JN 'abewep leo!sAgd pue sloajap aoj joadsul •q
•siajawejed pue juauwebuejje walsAs leu!j joj Gleudoidde aq of s6uillas
pue s6u!lej paleo!pu! Ajuan :s6uijjOS pue s6u!jed aO!na4-an!jOaload-juaajnOaanO e
LL/80/ZL juawaoeldE)H Ae�j-X o!u!10 8613N jeGgM H OS
I, -00099Z
9N11H911
00 6u!lg6!l sdll!gd ' L
:sainjoelnuew 43-i .8
-uo!jeo!l!oads ao s6uinneip aqj uo aaagnnasla ao alnpagos ai!eu!wnl aql ui
palsg se sai!eu!wni ap!noid 'sjuawaa!nbaa gj!nn aoue!ldwoo of joafgnS :siainjoelnuew aiieu!wn-1 V
S2i32jn10V3nNVW VZ
S1OnaO2dd - Z i2iVd
-uo!jona;suoo;o aapu!ewai bu!anp
6uil!os pue a6ewep;o Al!l!q!ssod az!w!u!w of Nionn .iagjo q;!nn uo!lellelsui bu1jg6!l aouanbaS .8
->{aonn aagjo gj!nn 6u!lg6!l }o uo!jelle1su! Goe}ialu! Apadoid o}
'sAennaoe.i pue 's6uipl pue saxoq leoujoala 'salgeo/saj!nn 6u!pnloui �ionn iagjo gj!nn ajeulpioo0 V
:9Nnn03H0S (INV 91\110N3nO3S s'l,
•nnau gj!nn ooeldaa'sluouodwoo jo sj!un pabewep
llelsu! IOU o4 •segs!u!l to 6u!aoos pue '6u!�eaaq '96ewep juanaad of Allnjaaeo 6u!}g61l alpueH .0
-punoa6 }}o parolq pue jell piel 'Al!p!wnq 'sainjeaadwol owajlxe 'buil!os 'ainisiow
'aagjeann woal pajoajoid eaae pafeli;uan-Mann ap!su! GaoIS -6u!6e�ped leu!6uo ui bu!lg6!l ajols .8
abewep woal
saa!eu!wnl joajoid Aliadoid go!gnn 'sbuiddeann io s.iouieluoo pajeougel-Aiojoe; u! 6uggBll Jan!laa V
9NI-laNVH (INV `3]EMJO1S `M:13AI-130 V!,
-joafoid s!gj jo; pai!nbei jegj of jel!w!s Naonn 6u!lgbil gj!nn sjoefoid
uo aouauadxe uoilellelsui ln;ss000ns;o sieE)A C Iseal;e gj!nn swa!d :suo!jeoiplenO s,aallelsul .8
'saeE)A 9 uegj ssal IOU
aoj aovuos jel!w!s ui asn luoloels!les ui uaaq aneq slonpoid asognn 'paainbaa s6uijea pue sadAJ
'saz!s jo 6u!lg6p;o aanjoelnuew u! poMua Alielnbei sw�!d :suo!�eo!�!lenO s aa�n�oeInuew V
:30NVdnSSV AinvnO E' L
-uo!joas s!q; u!q;!nn pajs!l si uogewiolui lejuawalddnS
sjuawaimbai lel4!wgnS aol leo!a10013 JOI sllnsa�j �aoM uowwo0 00 90 9Z uo!joas Gas V
:S-lV111W8nS Z'L
f(131) apo!Q 6u!if!w3 101-1 . L
:6u!nnollo; aqj apnloui uo!joas s!qj u! 6uijg6!l to sadA1 '8
salnpagos ui pue s6u!nneip uo pajeo!pu! aie Naonn bu!jg6!l 10 sl!ejap pue 'uo!jeool 'juajx3 V
:mivnwns vi,
WV A3N39 - L 12]Vd
9N11H911 — 00 09 9Z NO11O3S
L L/80/Z L juawaoeldad Aed-X o!u!1O aBMA WOW H OS
Z - 00 09 9Z JNUH9171
•joaj!yoay Aq nna!naa
jol 'u!a.iay pa!J!oads jo pajeo!pui ueyj jagjo 'bu!uaJsel jo poylaw 'siabuey jo u61sap J!wgnS
�y6!ann aa!eu!wnl jjoddns Aliadoid of siabuey qj!m saxoq JalJno jo/pue sa.ueu!wnl ap!noad •0
sJuawaa!nba� sll!llnJ 6u!ly6!l Jey} ainsua o; sao!joeid Aiisnpui pez!ubooaa yl!m pue 'sp.iepuels
VA3N '„uo!#elleJsul;o PaepuelS„ s,`d03N '03N Jo sjuawaiMbai elgeo!ldde 'suo!lon.ilsul
uajj!jm s,jaan}oeJnuew qj!m aouep.i000e u! 'paleo!pu! se sJy6!ay pue suo!leool le bu!;y61I Ilelsul •y
N011V-1-I /1SN1 Z•£
•aalle1sul of algeldeooe jauuew
ui pajoeijoo uaaq aney suo!j!puoo AjoJoels!Jesun Igun Niom qj!m paaooid jou oa -Tom ayJ
Jo u01101dwoo aadoid of lejuawujap suo!j!puoo jo 6u!lunn u! joloeiluoo AJ!;oN •6u!ly6!l bu!}ioddns
jol aleilsgns pue 'pallelsui aq of s! 6u!jy6!I yo!ynn japun suo!;!puoo pue seaje au!wex3 y
:NOIiVNINVX3 6•£
NOunO3X3 - £ i�:!Vd
•lauueyo n06-0 ayJ uo a6ejlon tiepuooas ajeu!w!la 01 ap!s 60leue [Uepuooas
ayj uo u011elos! yj!M pap!no.id aq Ileys saan!aP AU -0 IIV •%06 ueyl ssal aHl :sJanua d3-1 •0
•sdwel Ile SOI pap!noid aae (aofnos jy6!l ayj Jo aouejeadde juals!suoo
ayj) aouejeadde joloo pue (saolnos dwel Jo sJoadse buuapuaj Joloo) !J!lap!; X0100
Jey} Jueliodw! s! }I •pajeo!pui as!nivaylo ssalun jay6!y jo 99 Ido qj!m sdwel Ile ap!noJd Z
'09W -I
V 6LWq sPJePUeJS S31 yl!M aouepi000e w aq of uo!lewjojui pue sionpo.id 43q II` ,, •q
s a31 „a�!ynn„ jo} A6olouyoaJ aoydsoyd aJowaJ aney pegs saa!eu!wnl aoopul„ •e
,.•pajou as!nnuaylo ssalun 'aanup ayj qj!m alcIgedwoo
aq Ileys yoj!ms jaww!p ayl •s6uimeip ayj uo pajeo!pui ajagm bu!ww!p aq Ileys
JanuP Q3q ayl •6u!snoy aneu!wnl aqj wojj ajejedas algeaoeldaa aq Ileys fxlgwasse jy61I
a3g ayl •saoydsoyd aIowaJ aney lleys sai!eu!wnl aoopul. '0602-£ -ISS P'ePuels yW3N
of pauu!q aq IIeys s,a3q -sinoy 000'05 ja4e aj!I dwel Jo %OL ulelaa JeyJ s,43q ep!no.ad
sdwe-1 •0
•as!ou pajeJaua6 aanup uadwep of se pajonilsuoo os pue 'J!un
uowwoo se papunoa6 s}ied lejaw qm 'sayojeo pue sa6uwy paleaouoo y}inn aa!eu!wnl u6!saa
•uogelleisui ajaldwoo e aol paa!nba.i sluauodwoo asoyj y;!nn 'palgwasse-fuo}oej sa leu!wnl
diyS •6uu!nn pue 'sunup Jua101110 A6Jaua 'sJoIoal;aa 'sal npow 43j }ua!o!jja-fx6aaua 's6u!snoy
'ol paj!wg jou inq 'qj!m ajaldwoo 'pajeo!pui s6u!jej pue sadAJ 'sez!s 10 6u1;y61l aPnoad :leJauaO y
1N3WdinoD i Z•Z
•juawd!nba paipoads
pue suo!jeoipoads qj!m aouegdwoo ale!luelsgns of jjodaj uosuedwoo pue Ajojeaogel bu!lsal
juapuadapui ue wojj e;ep Isal AIddns pue lenoidde joud isenbei Ileys siain}oelnuew jayjo II`d •0
e!ueAIAS weJs0 •9
e!yo!N •.v
332JO £
pal!wnj z
L6/90/Z6 Juawaoeldad AeH-X o!u!10 a6PQJ JeOyM H OS
£ - 00 09 9Z JNUH011
„•spaepuelS
pue salod,. '£ L959Z uolloaS pue „'6uipunoa0„ 'gZS09Z uolloaS of 6ulpa000e saileulwnl punoa0 .8
-spunoi6
anlloalla pue luouew.ied ainsse of yggt, plS 1n ul payloads sonbiol 6ulualg6ll gl!m Aldwoo
of suolloauuoo ualg6ll •paleolpul se 6ullg6y jol suolloauuoo 6ulpunoj6 luawdinbe apinad V
ONIQNnO&D 5'£
-lualul
u6lsap gl!m eoueildwoo ul pue saillsualul 1g611 pannbai apinoid of sajleuiwnl algewle lsnfpy -0
pouad uollonilsuoo to japulewai 6uimp a6ewep wojl saileulwnl pallelsul loaload '8
-sioloagai pue sasual woal sa6pnws pue
sluudjabull uea10 -uoilellelsuw to uollaldwoo uodn sugep uollonalsuoo pue alp l0 builg611 uea10 d
JNINV 10 aNd JNllsflf civ v£
-uogaldwo0 lelluelsgnS to alea
agl bulnnollol jean( auo to pouad e Jol saanlap/salnpow (]Al Ino pawnq pue aniloalap aoelday V
1O :liNO0.klllvnz) 4-131-A £'£
•sluawailnbai
Jaglo sol „spJepuelS pue salod„ `£L959Z uolloes uolleollloads of jala2l -s6uimeap dogs
pue suoilonjlsul uallpm s jainloelnuew of 6ulpa000e ainoas pue lana) 'aaenbs 'gwnld shun JOS A
-apo0
leouloa13 leuolleN aql pue '8 pue yggt, spls -in ul payloads sanbiol 6ulualg6il yl!m Aldwoo
of sleulwaal pue sioloauuoo u914611'paleoipw lou aje sluawa.ilnbaa 6ulnbiol s,jainloelnuew
ejegM -saoloauuoo luawdlnba jol sanlen 6uivalg6ll anbiol pagslignd s,jainloelnuew
luawdlnba gllnn eouepj000e ul 'slloq pue smajos 6ulpnloul 'sleulwjal pue sJoloauuoo ualgbll 3
slaoddns leinlonuls of llainoas saileulwnl uelsej a
-aoe}ins
pagslull pue awed ueemlaq a6e� eaj lg6ll aleulwlla of Apado,id saiiewwnl palunow gsng llelsul '0
-� oels aq Aew sajlnn asagl -anoge ainlonuls
aql of 6uisnoq aiieulwnl aql wojl paloauuoo siabueq a6ne6 Z L 'ON .enol Aq anoge
ainlonuls eql wojl Alloajlp polaoddns aq reqs ajow jo spunod 99 6ulg6lann saneuiwnl .9
-joels aq Aew sajim asagl anoge
a.inlonils aql of 6uisnoq aiieulwnl aql wojl paloauuoo saa6ueq abne6 Z L 'ON onnl 'anoge
sluawannbai aql of uollippe ul 'aneq Reqs spunod 9g uegl ssal 6uig6lann saiieuiwnl ..v
-aauuni uiew aql se Alpedeo
6ultiJea awes aql epinoid reqs siauun.i ssojo asagl 'saneuiwnl lioddns of siabueg
jeluawalddns lnogl!m pasn we siauun.i ssojo uagM -pemollol si walled ja6ueq jelnpow
„gt, e 11 pajinbaj lou we sja6ueq leluawalddns 'pasn aae swelsls Alnp-fxneag uagM £
-aileulwnl goea to jauaoo goea to „£ uigllnn sjagwaw
pub agl of pagoepe aq Reqs sja6ueq a6ne6 ZL 'ON 'pasn aae swalsAs alelpawaalul uagM Z
•uoiloamp !ue ul builoe lg6lann aaleulwnl eql to %00 L to Alpedeo e aneq Reqs aoinap
luawgoelle aql -walsAs buipoo popuadsns agl of pagoelle Alanillsod aq llegs saaleuiwn-1
L L/g0/Z L
luawaoelda�A Ae�l-X oluil0 06pi�l WOW H10S
17- 00 09 92
JNUHJI-1
00 09 9Z NOUO�]S 30 GN3
•6ugsajaa qj!m paaoo,id pue 'spn mou ql!m eoeldw pue
anowaJ 'as!muaglo 'aouegdwoo ajejIsuowep of Isajoi uagj 'al!s le spn 6u!uo!lounjlew joaijoo
'elq!ssod aiagM -sluawaa!nbai qj!m aoue!ldwoo pue Al!l!gedeo alealsuowap o} Abioua leol.goala
Aldde 'pazibioua uaoq seq Aal!noa!o bu!pl!nq aa}}e pue 6uilg6!I;o uo!je11e1su! jo uo!jaldwoo uodN e
NOUV` J1SNOW30 L'£
Aluejaem s jajnloelnuew jean( an13 — aanuu pue 03q '£
aeeA I- - •oja 'buIJIM 'saa!eu!wnq z
£'£ gdeibeied aad - sdwej .I.
:smollol se spouad qj!m suo!l!puoo lejauab aqj ui gljoj jas se aoueld000e
jo aIep woaj aq llegs pouad AlueiaeM -sloalap leo!aloala pue leo!uegoew Juaaaqui woaj aoij
o1a `6u!a!M 'saa!eu!wnl 'sdwel 'slselleq 6uipnlou! juawdinba Ile ealueaenb llegs aoloealuo0 aql y
AiWtl JVM 9'£
L 6/90/Z 1, juawaoelda�j Ae�l-X 01u110 915MA IeagM H OS
Final Shop Drawings:
❑ Gensler
Date: (ASA)
Released for Production: (ASA)
LOCATION OVERVIEW - LOOKING NORTH
Wheat Ridge -
SCL Health Medical Group
0% 170 qIS6
APPROVED
Reviewed for Code Compliance
g4UL / //121h I-)
%an; Examin Date
va8duv of Oennit: the mumwe oro remW Or 0AProval Mvlaes
andoonputalinro shol! not br a pemrif /br, ar an aWyro.olo� ergr viofWiw to
op gldK wwR;an o/dK I»rVA# cede aroJ0"rGtyadiwrKes. itn�w
tol+Meaahabm rwMeal asa+fAerwtriar oldk mrrq
taw oroftrol*MKOS oJOhf Gly shON "t 6e balls.
�I= SCL Health
,1r MEDICAL GROUP
Wheat Ridge - SCL Physicians
9830 S.1-70 Frontage Rd.,
Wheat Ridge CO 80033
Al Bl mm:::CE
Project 18627.18
Client:
SCL Health
Project:
Wheat Ridge - SCL Physicians
9830 S. 1-70 Frontage Rd.,
Wheat Ridge CO 80033
ASA PM: Jennifer Copeland
Notes:
Paint a d materip& gtals ,
R for 7�r10 mea rte� �revie%vt al
City of eat i."I' �'as� 6- abncation�
APPROVED
BY:
DATE:�-
COMM N S:
w
ArapahoeSignArts
1135 W. Mississippi Ave.
Denver, Colorado 80223 U�
PM 303-937-1915 V
FX 303-937-7711
Website: arapahoesignarts.com USNO
LGGAT1,('P'V' !°V1 I"'.
FINISH & MATERIAL SCHEDULE
Paint Finishes
P-2
M.A.P. Paint System
MP White
LVS-202
1 st Surface, Satin Finish
Vinyl Finishes
V-2
High Performance Vinyl
7725-10 (220-10)
3M White,
1 st surface application
Material/Substrate Finishes
M-2
3/16" thick 2447
white acrylic.
i
M-9
1/8" aluminum,
painted.
�E 0
P-5 P-6
M.A.P. Paint System M.A.P. Paint System
'SCL Blue' 'SCL Green'
to match Pantone 286 c to match Pantone 7740 c
1 st Surface, Satin Finish 1 st Surface, Satin Finish
P-16
M.A.P. Paint System
to match building block
MP 02795 Spice Trader (Larkridge),
1 st Surface, Satin Finish
Electrical
pS1 '` Power Supply: GEPS12-60U-NA
Input: 120-277 VAC, 15-20 Amp Circuit
Output: 12 VDC Class 2
LED1LED Modules: GEMM71-2 (7100k)
Fonts
F-1 Gibson Regular
abcdefghijklmnopqrstuvwxyz
ABCDEFGHIJKLMNOPQRSTUVWXYZ
F-2 Gibson SemiBold
abcdefghijklmnopgrstuvwxyz
ABCDEFGHIJKLMNOPORSTUVWXYZ
Project 18627.18
Client:
SCL Health
Project:
Wheat Ridge - SCL Physicians
9830 S. 1-70 Frontage Rd.,
Wheat Ridge CID 80033
ASA PM: Jennifer Copeland
Notes:
Paint and material submittals
to be provided for final review/approval
prior to release to fabrication.
M.A.P. stands for Matthews Acrylic
Polyurethane paint system.
wig=
NONE MUM FA
V-5 V-6 V-7 V-8 V-9 V-10 Issue Date Drawn by:
3M Translucent Vinyl 3M Translucent Vinyl 3M Dual Color Film 3M Dual Color Film High Performance Vinyl High Performance Vinyl
3630-157 3630-156 White: 3635-210 White: 3635-210 7725-10 (220-10) 7725-114 (220-114) 11.03.2017 JS
'Sultan Blue' 'Vivid Green' Digitally printed Digitally printed with digitally printed 3M Clear, Digitally printedDate By:
to match Pantone 286 c to match Pantone 7740 c graphics as shown, Printed Edge Graphics,
1 st surface application. 2nd Surface application.
Trim Cap Finishes m
m
m_
m
m
TC -1 TC -2
M-6 M-8
Jewelite Trim Cap Jewelite Trim Cap ArapahoeSignArts
Electrical Switch, .040" aluminum return coil, part#AMJSB1150 part#AMJGNSR1150
Transco Model#] 000 3" width. 1"wide,'Blue' 1"wide, 1135 W. Mississippi Ave.
20A 120-277VAC, Holiday Inn Green' Denver, Colorado 80223
and UL Labels L
PH 303-937-1915
FX 303-937-7711
Website: arapahoesignarts.com LISTIr�
City of
-
(Wheat Rid. .
Finish & Material
Schedule
ELEVATION VIEW
50" 1 38 1/2"
M-2
V-7
M-2
Approximate
V-8 PS 1 ' Location of Incoming
z- Primary Power
160 1/32"
1043/4"
C He L ealth
14 1/2"
MEDICL8_,AL GROUP 1/211
Incoming
Primary Power
Photos NTS
SCALE: 1/2" = V- 0"
Incoming
Primary Power
New Sign - Day
photo mock-up
�AII= SCL Health
r MEDICAL GROUP
SIDE VIEW 3"
PS 1
Incoming
Primary
Power
I P-2
M6r
olvtlwedInd Compliance by the �► +,
ft of Whe flannirsg Oivision ice/
APPROVED
fiR.M
New Sign - Night
photo mock-up
Project 18627.18
Client:
SCL Health
Project:
Wheat Ridge - SCL Physicians
9830 S. 1-70 Frontage Rd.,
Wheat Ridge CO 80033
ASA PM: Jennifer Copeland
Notes:
Based on 170821 -Wheat Ridge -Phase 1_V3.pdf
Dated Sept 21, 2017
Internal power suppy with removable panel on top
of back panel for maintenance access.
Switch will be on the return, as shown.
Installation Notes:
11.03.2017 JS
m
m
G
ArapahoeSignArts
1135 W. Mississippi Ave.
Denver, Colorado 80223
PH 303-937-1915
FX 303-937-7711e�
Website arapahoesignarts.com u
`iding ID i t Al
JOROM ide of Buiidi ig
Internal Power Sul
Wiring Detail
Wall
Surface
nchor Bolt,
Additional
Fasteners
As Required
Incoming
Primary Power
SCALE: NTS
Project 18627.18
Client:
SCL Health
Project:
Wheat Ridge - SCL Physicians
9830 S. 1-70 Frontage Rd.,
Wheat Ridge CO 80033
ASA PM: Jennifer Copeland
Notes:
Based on 170821_Wheat Ridge—Phase 1_V3.pdf
Dated Sept 21, 2017
Internal power suppy with removable panel on top
of back panel for maintenance access.
Switch will be on the return, as shown.
Installation Notes:
11.03.2017 JS
R1
R2
R3
R4
O-ArapahoeSignArts
1135 W. Mississippi Ave.
Denver, Colorado 80223■
PH 303-937-1915 `
FX 303-937-7711
Website: arapahoesignarts.com u�
U 11 a uilding ID Sign Al
of
o; Side of Building
75"
3E
3E
Existing Condition
Project 18627.18
Client.
SCL Health
Project:
Wheat Ridge - SCL Physicians
9830 S. 1-70 Frontage Rd.,
Wheat Ridge CO 80033
ASA PM: Jennifer Copeland
Notes:
Based on 170821_Wheat Ridge—Phase 1_V3.pdf
Dated Sept 21, 2017
All white copy letter height: .97".
'WHEAT RIDGE' changed to be all capital letters
to match design intent at other SCL clinics.
Installation Notes:
Issue Date Drawn by:
11.03.2017 is
0ArapahoeSignArts
1135 W. Mississippi Ave.
Denver, Colorado 80223
PH 303-937-1915
FX 303-937-7711
Website: arapahoesignarts.com USM
City off ront Door
Wheat Ride ntry `lass l k
North Side of Building
Building Divis n
�JIM
gn
ELEVATION
.&m3v*vw
rZ"(-Fmva
ue- rZ- :,ke
03AOVddV
10 guluueld aPPW ;eaLlM 10 Alli
auelidwo:) 2uluoZ J04 panna!naa
rade
Project 18627.18
Client:
SCL Health
Project:
Wheat Ridge - SCL Physicians
9830 S. 1-70 Frontage Rd.,
Wheat Ridge CO 80033
ASA PM: Jennifer Copeland
Notes:
Based on 170821_Wheat Ridge—Phase 1_V3.pdf
Dated Sept 21, 2017
All white copy letter height: .97".
`WHEAT RIDGE' changed to be all capital letters
to match design intent at other SCL clinics.
Installation Notes:
0ArapahoeS ilgnArts
1135 W. Mississippi Ave.
Denver, Colorado 80223 �■
PH 303-937-1915 `
FX 303-937-7711
Website: arapahoesignarts.com
city of Front Door
Wheat Ridge !Entry Glass Vinyl,
Building DMs ll South Side of Building
240"
217 3/4"
185 3/4"
28 1/4": 1� SCL Health Medical
EXISTING CONDITION -
LARGE DOUBLE-FACED PYLON WITH FLEX FACES
EAST SIDE - EXISTING CONDITION
WEST SIDE - EXISTING CONDITION
Reviewed for Zoning Compliance by the .( "ect 18627.18
City of Wheat Ridge Planning Division
APPROVED client:
SCL Health
BY: `> c o'TT Lk'?Lr k
DATE: J -z / is/ 1*
COMMENTS; 115'z ze ok
14" 48„
rout)
LI
PHOTO -RENDERING
32"
SCALE: 112" = 1 ' - 0"
Wheat Ridge - SCL Physicians
,tom 1i W-
9830 S. 1-70 Frontage Rd.,
t Ridge CO 80033
f '
ASA PM: Jennifer Copeland
Notes:
Based on 170821 Wheat Ridge—Phase 1_V3.pdf
Dated Sept 21, 2017
Installation Notes:
Quantity: (2) panels required.
white flex faces (translucent material)
to replace existing pylon faces
11.03.2017 JS
m _
m
�ArapahoeSignArts
1135 W. Mississippi Ave.
Denver. Colorado 80223 ItL
PH 303-937-1975 VV
FX 303-937-7711
Website arapahoesignaris.com Lim
'tyOMI-Tenant
MW nd Sign -
Di,,�,e acennent Panels
A
m
Property Address: '�6 ,
s
Property Owner Email
Address:
FOR OFFICE USE ONLY
...
A5 C
Plan Review
Building Permit PA,1D
Arcttit ctii8ngine r E -tail.
Phan :
Contr tors City Llcolns46, Phone 7e4- a
El ctd t;
W.R. City License
Plumbing:
t.Rm City License
Mechanical:
1.R. City License
Complete all information :BOT sides of this form
NEW COMMERCIAL STRUCTURE ELECTRICAL SERVICE UPGRADE
NEW RESIDENTIAL STRUCTURE COMMERCIAL ROOFING
COMMERCIAL ADDITION RESIDENTIAL ROOFING
RESDENTIAL ADDITION WINDOW REPLACEMENT
COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
RESIDENTIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
PLUMBING SYSTEM/APPLiANCE REPAIR or REPLACMENT
ELECTRICAL SY�TEMIAPPLIANCE REPAIR or REPLACEMENT
OTHER (Describel—'iXio.i.14
1 _ ' ';I I - I , , e C -A
IkVM
Sq. FULF
Stu's Gallons
Amps Squares Other
04, of
CITY OF WHEAT RIDGE tNO AND INSPECMON SERVICES DIVISION
7500 W 29th Ave Wheat Ridge, CO 80033-8001 p303.235.2855,f 303.237.8929
the projecttype and be
attached
<:..:.t: • Building • .. Application'tirrwet. submission.
:.
Applications presented ft. submission without w completed Proof of Submission form from
required
: t ..:
agency w4ft not be accepted or proces"d.
Project Address: 2o
f i�•
i►
' ofFirmAndividualsubmitting documents:
.:: ilr p
Project Type/Description: Z?Lf�'�4+6
05
at _t t' • t t+► ♦ t t,t "t e: • «Mt t i •t _, ,„
• ` ♦ s t t L'
a t t : • a .: t . t• ''
o Wheat Ridge Fire Protection
Arvada Fire Protection
•Wheattt" Water District
• Consolidated Mutual Water District
• Valley Water District
• Denver Water
• Wheat Ridge Sanitation Dist
• Clear Creek Sartitation
• Fruitdale SanitationDistrict
• Westridge Sanitation
• Other I
MM
Signature: Wil�aadl�� ,�dA���� „�,. a „::: .....
CERTIFICATE OF COMPLETION
City of Wheat Ridge
7500 W 29th Ave
Wheat Ridge CO 80033
Permit# 070903 Issued: 02/07/08
Stipulations: REMODEL SOUND BOOTH
THERAPY ROOM
WAITING ROOM FOR MEDICAL OFFICE
This certificate verifies that the building constructed and/
or the use proposed of the building and/or premises, under
the above permit number and on property described below,
does comply with the Wheat Ridge Building Code and
development standards of the zone district in which it is
located and may be occupied. All other licensing
requirements for the City must be met.
Site Address: 9830 2-70 Fr Rd S
Parcel Number: U1377
Owner: EXEMPLA LUTHERAN
Contractor: Davis & Davis Construction, In
5600 W 13TH AVE
LAKEWOOD, CO 80214
For the Following Purpose: Commercial Remodel
Co~e Editions
NO change shall be made in the USE of
V 2003 ICC/2005
NEC
this
building without
prior notice
2003 ICC/2002
NEC
and a
new Certificate
of Completion
1997 UBC/2002
NEC
from
the City of Wheat
Ridqe,-
-
Sprinkler System
/
ef lding
Inspector
Zoning Ad '
nistrator
IFICATE MUST BE POSTED BY FRONT DOOR OF
COMMERCIAL OCCUPANCIES
..,.v,..•.•= .v . _ r, v.v..•.iv.r-i..,.... ..i :.r_~,av..~,-. ~w' -v , s..v.-.-: ~.~.^.r.; s.i.r r. w'.,,...i
, . . l
Date:
:
!
; A Certificate of Occupancy.l Completion =
2 has been requested for; >
7
,
' a~3o v~
ADoIaess: LD Qt),~-
~ .
t
i
~
~ PuRpOSE OF STRUCTURE.
y
\ !1
t
~ Building Department Approval
~
z Remarks
~
~ Zoning Approval
~ Remarks
,
5
< Public Works Approyal:
C Remarks:
$ Fire Marshali Approval:
~ (If Appticable)
,
~
~
~ Remarks:
t
S
; Sanita4ion District Approval
: (if Applicabte)
,
i
~ Remarks:
< Water District Approval:
; (If Applicable)
l
z
~
;
}
S
t
<
S
:
Remarks:
:
~r 0) X
zo.~~
W :7N Z ^
~ ~L
L6
Q oraviN
Wc~y
~ ~o
Q M .
Z C C1 U
O
O'vNLo
W
o
W m ~
.M.. N
~ O
H ~
z
~
~
~
O
U
W
V
H
0
Z
Z
0
~
U
W
a
U)
Z
ti
R
~
4
4 h
T ~
H E
c n
o Z
a~
c a
N
N
d
V
~
'Q
m
0
n
c!
w~y
I ~S
~
C,
~
h
e
N
~
M
a
~
~
Q
e
0
u
a
a
O
G
~
O
(
U
~
C
p
\
ci
O
U
N
~
(D
N
a
~
r
E
a
N
N
y
C
C
Q1
-
o
d
~
a)
=
~
a
c
>
o
u
~
n
O
~
v
O
c
aci
d
Z
~
3
❑
~
•
0
City of Wheat Ridge
Commercial Remodel PERMIT - 070903
PERMIT N0: 070903 ISSUED: 08/27/2007
JOB ADDRESS: 9830 I-70 Fr Rd S EXPIRES: 02/23/2008
DESCRIPTION: REMODEL SOUND BOOTH, THERAPY ROOM, WTG. ROOM OF MED. OFFICE
CONTACTS
GC 303/462-1405 01-8526 Davis & Davis Construction, In
OWNER 303/467-4104 EXEMPLA LUTHERAN
sub 303/690-5690 Kevin M. Desloover 02-1025 KhID ELECTRIC INC.
sub Bi11 Caldwell Kemble Plumbing
sub 303/940-1223 Felix Crespin 02-2152 Crespin Mech Inc.
PARCEL INFO
ZONE CODE: C-1 USE: B
SUBDIVISION: UA BLOCK/LOT#: 0/
FEE SUMMFIRY ESTIMATED PROJECT VALUATION: 33,182.00
FEES
Permit Fee 626.87
Plan Review Fee 407.47
Tota1 Valuation .00
Use Tax 597.28
TOTAL 1,631.62
Comments
I hereby certify that the setback distances propoaed by this permi[ application are accurate, and do not violate applicable
ordinancea, rules or regulations of the City of Wheat kidge or covenants, easementa or restrictiona of record; that all
measurements shown, and allegations made are accurate; that I have read and agree to abide by all condi[ions printed on this
application and tha[ I assume full responsibility for compliance with the Wheat Ridge Huilding Code (I.B.C) and all other
applicable wheat Aidge Ordinancea, for work under this pesmit. Plans subject to field inapection.
Signature of contractor/owner date
1. This permit was iseued in accordance with the provisions ae[ forth in your application and is subject [o the laws of the
State of Colorado and to the Zoning Aegulations and Building Codes of wheat Ridge, Colorado or any other applicable
ordinances of the City.
2. This permit ahall espire 180 days from the issue date. Requests for an extension must be received prior [o expiration
date. An extension may be granted at the discre[ion of the Building Official.
3. If thia permit expiree, a new permit may be acquired for a fee of one-half the amount normally required, provided no
changes have been or will be made in the original plans and specifications and any suspension or abandonment has noe
exceeded one (1) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees ahall
be paid for a new permit.
a. No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
5. Con[ractor shall notify the Building Inspector twenty-four (29) houra in advance for all inspections and shall receive
written approval on inspection card before proceeding with successive phases of the job.
6. The issuance of a permit or the apprwal of drawings and specifications shall not be construed to be a permit for, nor
an apprwal of, any violation of the provisions of the building codes or any other ordinance, law, rule or regulation.
All plan revicw is ~ubj~s to field inspectione.
Signature of ChiefjJ?T17{ng Official date .
INSPECTION QUBST LINE: (303)234-5933 BUILDING OFFICE: (303)235-2855
REQUESTS MU T BE MADE BY 3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
OF WHE4rq
City of Wheat Ridge
°OLoRaCommercial Remodel PERMIT - 070903
PERMIT NO: 070903 ISSUED: 08/27/2007
JOB ADDRESS: 9830 I-70 Fr Rd S EXPIRES: 02/23/2008
DESCRIPTION: REMODEL SOUND BOOTH, THERAPY ROOM, WTG. ROOM OF MED. OFFICE
CONTACTS
GC
303/462-
1405
OWNER
303/467-
4104
EXEMPLA LUTHERAN
sub
303/690
-5690
Kevin M. Desloover
sub
Bill Caldwell
sub
303/940-
1223
Felix Crespin
01-8526 Davis & Davis Construction, In
02-1025 KMD ELECTRIC INC.
Kemble Plumbing
02-2152 Crespin Mech Inc.
PARCEL INFO
ZONE CODE: C-1 USE: B
SUBDIVISION: UA BLOCK/LOT#: 0/
FEE SUMMARY ESTIMATED PROJECT VALUATION: 33,182.00
FEES
Permit Fee 626.87
Plan Review Fee 407.47
Total Valuation .00 ~~~`j
Use Tax 597.28
TOTAL 1,631.62
Comments:
hereby certify that the setback distances proposed by this permit applicar,ion are accurate, and do rioL violate appl:cable
erdinances, rules or regulations of the City of Wheat Rid9e or covenan[s, easemeri[s or restrictions of record; that all
measurements shown, and allegations made are accurate; [hat I have read and ayree ro abide by all conditions printed on hhis
application and that I assume fu11 responsibility for compliance with the wheat Ridge Buildiny Code ;I.B.C) and al'_ other
applicableAheat Rid9e O~f]inan~,es, for Ark undex this permi[. Plans subject to field inspection.
date
1. This permit was issued in accordance with the provisions set forth in your application and is sLibject to the iaws of the
State of Colorado and to the Zoning Aegulations and Huilding Codes of wheat Ridye, Colorado or any other applicabie
ordinances of the City.
2. This permit sha11 expire 180 days from the issue date. Requests for an extension mus[ be reczived prior to expiration
dete. An extension may be granted at the discretion of the Huilding Official.
3. If this permit expires, a new permit may be acquired for a fee of one-half the aniotmt normally requiied, prwi3ed rio
changes have been or will be made in the original plans and specifications and any euspension cr abandomnent has mt
exceeded one (1) year. If changes have been or if suspenaion or abandonment excee3s one (li year, fuli fees shall
be paid for a new permit.
9. No work of any manner shall be done that will change the natural flow of wacer causin9 a drainage problem.
5. Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive
written approval on inspection card before proceeding with successive phases of the job.
6. The issuance of a pezmit or the approval of drawings and specifications shall not be cor.strued to be a permit for, nor
an approval of, any violation of the provisions of the building codes or any other ordinance, law, rule or regulaCion.
A11 plan review is sub~e9J tAxeld inspections.
of Chief
date
INSPECTION REQUuT LINE: (303)234-5933 BUILDING OFFICE: (303)235-2855
REQUESTS MUST BE MADE BY 3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
COMMUNITY DEVELOPMENT DEPARTMENT Building Permit Number: ~
of w"E`'T,p BUILDING INSPECTION LINE - 303-234-5933 Date:
CITY OF WHEAT RIDGE
° 7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80033 - (303-235-2855)
APPLICATION
Property Owner: EXe,-i c~ ~~c,,) ~c-.
Property Address: 9830 G.7eSt ~on~'Gt~ hone: 8303-NL7-
ConRactorLicenseNo.: 18.5a~ / a LJ~+oa+rirl~e,ob33
ComP~Y: pGa~s~ FJa01s 00hS+ruJ"o1 Phone:303. NIC~• I'fUS ~
OWNER/CONTR4CTOR SIGNA7URE OF UNDERSTANDING AND AGREEMENT I BuildinaDent.Valuation
I hereby certity that the setback distances proposed by this permit application are
accurate, and do not violate applicable ordinances, rules or regulations of lhe City of
Wheal Ridge or covenants, easements or restrictions of record; lhat all measuremenls
shown, and allegations made are accurete; that I have read and agree to abide by all
conditions printad on lhis application and thal I assume full responsibility for
compliance with the Wheat Ridge Building Code (I.B.C) and all other applipble Wheat
Ridge Ordinances, tor work under this permil. P!An3eybject to field inspedion.
(O W NER)(CONTRACTOR):
3.
V21U0:$
Permit Fee:$
Plan Review Fee:$
Use T •
Total:$
GPPwn,
Use of Space (description): /hekcak c-Mce 'y p Description of work: .~,Q,~ oµtia 1~oo-l'h'0~ rooin aAC7.
r-oor+a oG- can ex ~ SI-r~ m~c~.( oFF; cL
Sq. Ft. added ki(aG
COMMENTS:
Approval:
Zoning:
BUILDING DEPARTMENT
BUILDINGCOMMENTS: )QN"L'T~~C%!s
. Approval: ~ V I
PUBLIC WORKS COMMENTS: .
Approval:
IRE DEPARTMENT COMMENTS: SS Approval: E
Occupancy: Walis: Roof: Stories: Residential
Electrical License No: Plurr"
Company: -7,6,6 Com
Expiration Date: Expii
Approval: Appr N$ED:
(1) This permit was issued in accoMance with th
Coloredo and to the Zoning Regulations and
the City.
(2) This permit shall expire if (A) the work author
authorized is suspended or abandoned for a
(3) If this pertnit expires, a naw permit may be ac
have been orwill be made in the original plan:
(1) year. If changes have been or it suspensi[
(4) No work of any manner shall be done that wi,
(5) Contractor shall notify the Building Inspector
approval on inspedion card before proceedir
(6) The issuance of a permit or the approval of
approval of, any violalion otthe provisions of tl
is subject to Reld inspections.
Chief Building Official
Job valuation
itContractor Name GC_
Contractor License GC_
Contractor License renewal
for Contractor License
Contractor Insurance Cert.
SltO Plan
Fire Dept. Sign off
Engineering details
PVs °
"C
SuB`!~
SUB
GC3r SUB_
GC SUB_
Gr"J_ SUB_
/
Notification da,fe: Z ~
~
08l16/2007 08:36 3034327995 ARVADA FIRE DISTRICT
Arvada Fire Protection District
J~Division of Fire Prevention
Plan Review Comments
PAGE 02
Date'-~ Reviewed By:
Nazne of Project:
Unit/Suite Number:
e= Occupancy Classification:_,5,~54aure Feet:~~4~a~C~
Constrvction Typ~ _
Sprinkler System= Yes^ No ~ Fice Alarm System; Yes:~, No;~
Site:
t, ✓'~he addrass and or unit nunnber shall be posted on a temporaxy basis and shalt be
~permazaen,tly affixed W the building in a minimum oE 4 inch nunnbers on a contrasting
background-
xFC 03 505J..
Exits and Loeking Devices:
1, V The main exiit dooxs in groups B, k', M and S occupancies that aze providad with a key
~lockin,g deviee that is readily distinguisktable as locked, shall, be provided with a sign
statzng, "Tlais Door Is To Remain Unlocked Duriztg Hours. [f Found T ocked, Call 7he
Fire Dept_ Bigns are svailable {i'om tlae Divisioa of Fire Prevention at No Charge.
IFC 03 100$.13. Amended•
2, VJhen exi4 doors are used in pairs they shall open wizh one opecation. Edge or surface
^roounted flush bolts axe prohibited.
IFC 03 ] OOS.1.8.4.
3, vel e remaining axit doors shall Ue openahle from kbe i,nside withoLxt the usc of key or
special knnwledge.
IFC 03 100R.1.8.
Daar Swing:
1. ExiC doors shsll swiag in the direction of egress travcl where serving sn occupant load of
^50 or more persoas or a Group H Occupancy.
IFC 03 1008.1.Z.
Fax (3031 432
6503 Simms Street • Arvada, Colorado e0004-2607 •(303) 424-3012 • -7995
08/16/2007 08:36 3034327995 ARVADA FIRE DISTRICT PAGE 03
Page "Cwo
Exit Sepazation:
1, W'bere two exits ox exit access doorways are required from any poxtion of the exit
Jaccess, the exit doors or exit access doorways shall be placed a distance apart m not
Iess than one-half the length of rhe maximum overall diagonal dimension of the
builditlg or area to be sexved mea.aured by a straighl line batween exit doors or exit
doorways.
IFC 03 1014.2.1.
Distinguishabte Exit poors and Sgress Doors;
1,fMeans of egress doors shall be readily distinguishable £or adjacent constructzon and
fmisbes such that the doors are easily rccognSzable as doors. Mirrors oz similar reflecting
materials shall not be used on roeans o£ egress doozs. Means of egress doors sh,all not be
concealed by curtains, drapes, decorations or similu xnateriais,
IFC 03 1008.1.
Exit Illumination:
1. he roeans of egress, including the exit discharge shall be illuminated at all ti.naes the
building or space served by the means oF egress is occupied. In the event o£ a power failure
battery pack emergen,cy lighting units sliall be provided.
IFC 03 10063.
2_ Provide additional battery pack emergency light9ng uaxits in the following locations:
~CFC 03 10063.
Exit Signs:
1. 6xits and exit access doors shall be marked 6y approved exit sign readily visible f.rom any
~ direction oEegress travel. Access to exits shall be mazked by a readily visible exit signs in
cases where the exit or the path of egress is not immediately visible to the occupants. Fxit
sign placement shall be such that no point in an exiC acoess eorxidor is more than 100 feet
or the listed viewing distance for the sign, whichaver is less, from, the nearest visible sign.
IFC 03 1011.1.
08/16/2007 08:36 3034327995 ARUADA FIRE DISTRICT PAGE 04
Page 7hxee
Exit Sign Illumination: ensure
for 1. Exix signs shall be iiluminated at o~t~mO55Tthe sign illuminat on meatns natihonall 6ea d~tion
_ pf gp minutes incase of primary p
connected to an emergency power systezn provided from the stoxage batteries, unit
equipment or an on site generamt.
IFC 03 1101.53.
Additzonal6xit Signs:
Provide additional exit signs at the following locations.
IFC 63 101, l.l -
Tact•ile Exi ,Signs:
tactile Si,gn stating exit shall be provided adjacent to each doot to an ESzess stairway, an.
exit passage way and che exit discharge.
IFC 03 10113.
k'ira Pxotection Systems:
l. ConS~ction may require chatl,ges to the exisiting sprinkler synem. A mizumum o£three (3)
~~seYS o£plans wi11 need tp be submit ted for xeview and comment by the Di!rislon o£Fire
Prevcntion prior to work commencing. All work is to he per£ormed by a State o£
Colorado licenced spzinklex contactor.
IFC 03 901.4.
Firc Protection Systcm Permits:
t^,p Sepazate penmit will naed to be obtained fzom the Building Inspection Division of the
City of Arvada for sprinkler system alterations.
Rough Inspections:
1. ,0. rough inspectioo will need to be conducted of the changes to exisiting sprinkler Systems
~hy tha Division a F Fire Prevention.
Zk'C 03 907.].1.
08/16/2007 08:36 3034327995 ARVADA FIRE DISTRICT PAGE 05
Page k'our
z r1o woxk is to be concealed prior to inspections and correction oFdiscrepflncies noted.
~IFC 03 904.4.1.
Fire Deteccion and tVamn Syscems:
1. Changes to the exisitin$eCS of pl ns will need ta be su ubnvtted to he Div sion of Fire
~minimum of'Il vice (3) •
for review and eomment, including manufaotures model and listing
Qxeveation informatton
for equipnnent devices and materials.
IPC 03 907.1.1.
Fire Detection and A1atm Pecmits:
~ p sep~te permit will need tn be obtained from the Building Inspecdon Division of the
-Ciry of Arvada for changes to exisiting ftre detection and alarm systems.
Rougla InsPections:
t, A zottgh wiring inspection will need to k~e condueted by the Electrical Lnspector for the City
fof pn;gda A rough location and wiring inspectaon will need tb be condueted by the
Division of Fire Prcvencion- No work is to be concealed until all rough inspections are
Con UCteCl willdneed t be wi ne sed by theiDivis n o,f Fe P cvention~~ton and test o£ devices
IFC 03 907.1.7.
Audibility:
e ambient noise levels shall be obtained.
1 mum of l5 decibels above th
-A, IFC znini 03 40'1.10.2.
Llectrical ceptacles:
1 e ownar/oceupant will need to verify that su£ficient electzical receptaeles axe provided as
extension cords are not permitted, nox shall flexible cords pass through walls, ceilin$s or
doorwaYs.
[FC 03 605.5.
Changes to Exisiting Electzicai Panels:
1 V/Citcuit directories in electrical. panels will need to be updated to re£lect cwrrent conditzons
-zFC 03 6053.1.
08/16/2007 08:36 3034327995 ARVADA FIRE DISTRICT PAGE 06
Page Five
Identification of Electdcal Disconnects:
The addxess an:d or unit number wili need to be provided at the electrical disconnects.
-[k'C 03 605.3.1.1 Amecided.
Vehicle Impact Protectivn for Gas Meters:
1. Gas meters shall be protected &vm vekricular damage. Guazd postR sha11 comply with al1
~of the following tequirements.
IFC 03 312.1/ Ik'C 03 312.2
1. Constructed of steel aot less than 4 inches in diameter and conctete filled.
2. Spaced not less than 4 feet between posts on center.
3. Set no iess thaa 3 feet deep in a concxete Footing o£ not less thaq a 15 znch dianneter.
4. Set with the top of the posts not less than 3 feet above ground.
5. Located not less than 3 feet from the pxotected object.
Identification of Gas Meters:
Gas maters shall be identified with tlxe building addxes,a and or unit number.
~IFC 03 603.9.1. Atneaded.
Interior Fini h:
a. Walls and ceilings that are fintshed with materials other than paint or £actory finish nnay be
~requlred to meet the zequirements of Section 806 Interior Finish ai7d Decorative Materials.
Please contact the Diviaion of Fire Pzevention £or applicable code requirements.
IFC 03 806.
k'ire Exti ishers:
1. r ire extinguishers shall be a minimum of t► 4-A rated, 10-Ib. ABC dry chemical units, fully
~chazged with curren[ inspectxon tags. Contact thE Divxsion of Fire Preven3ion fox number
o£units and mounting locations.
IFC 03 9043 Amended.
2. Provide 4-A rated 10-1b. ABC dry chemical fire extinguishers at the following locations:
-IFC 03 906.3. Acrtended.
06/16/2007 08:36
Paga Six
3034327995
Additional Comments:
ARVADA FIRE DISTRICT
Addicional Requireznents:
t,k.,t,y code requirements arising firom constructiott will be addressed.
Flan Review Comments:
t, ese com.ments shall remain with the apptoved plans at the construction site.
Contact tnformation:
l. Please contact thc Division a£Fira Prevendon at 303-425-0905 for any questions or
additional information. Dircct lines for the following persons:
1. ire Marshal Sparky S}uaver:
2. Deputy Pire Macshal Randall Waigum:
3,_ Depury Pire Marshal Stave Steigledet:
303-425-0905 Ext 212
303-425-0905 Fxt233
303-425-0905 Ext234
PAGE 07
Inspection.s~
1.Twenty £our hours notice is cequired for all inspections and tests. Please call the Fire
Marshal oe Deputy Fixe Marshal assigned to tbe project to schedule inspections and tests.
IFC 03 105.2.2. Amended.
wH~r
City of Wheat Ridge
cOLORPCommercial Electric PERMIT - 060915PERMIT N0: 060915 ISSUED: 09/27/2006
JOB ADDRESS: 9830 I 70 FRONTAGE RD S EXPIRES:
DESCRIPTION: connect existing sign circuit to new sign
CONTACTS
gc 303/961-8823
Terry Hansen
06-0168 Hansen
Electric,
Inc.
owner 303/534-5005
Joe
Shames
Makovsky
Realty
PARCEL INFO
ZONE CODE: UA
USE: UA
SUBDIVISION: UA
BLOCK/LOT#: 0/
FEE SUMMARY
ESTIMATED
PROJECT VALUATION:
250.
00
FEES
Permit Fee
30.55
Total Valuation
.00
Use Tax
4.50
TOTAL
35.05
Comments:
This permit goes with Sign Permit 060778
Electrical must meet 2002 NEC .
Subject to field inspection
I hereby certify that the eetback dietancee propoaed by this permit application are accuzate, and do not violate applicable
ordinances, rules or regu tione of the City of Wheat Ridge or covenante, easements or reatrictions of record; that all
measuremente ahown, and legations made are accurate; that I have read and agree to abide by all conditione printed on this
application and that I assume full reeponsibility for compliance with the Wheat Aid9e Building Code (I.B.C) and all o[her
>al~b eat ' Ordinancea, for work under this peimit. Plans eubject to field inspection.
/'~',s-s, 9'-07-0 6
' date
ignature of contractor/owner
1. This permit was iseued in accordance with the provisions se[ forth in your application and is aubject to the lawa of the
State of Colorado and to the Zoning Regulations and Building Codea of Wheat Ridge, Colorado or any othez applicable
ordinancee of the City.
2. Thie permit shall expire if (A) the work authorized is not commenced within sixty (60) days Erom iseue date or (B) the
building authorized is suapended or abandoned for a period of 180 days.
3. If thia permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no
changea have been or will be made in the original plans and apecificationa and any suepension or abandonment has not
exceeded one (1) year. If changee have been or if euspenaion or abandonment exceeds one (1) yeaz, full fees shall
be paid for a new permit.
a. No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
5. Contractor ehall notify the Building Inapector twenty-four (24) hours in advance for all inapections and shall receive
written approval on inapection card before proceeding with successive phases of the job.
6. The Seauance of a permit or the approval of drawinga and apecifications ahal'1 not be conetrued to be a permit for, nor
an approval of, any violation of the provisions of the building codes or any other ordinance, law, rule or re9ulation.
All plan review is subject to field inspections.
Signature of
IN58ECTION RSQUSST LINE: (303)234-5933 SUILDING OFFICE: (303)235-2855
REQUESTS MUST BE MADE BY 3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
aa
oF w„Eqr Plan Review
~ '~o City of Wheat Ridge Building Permit Number:
~ Community Development Department Date:
~o[oRnoo MINOR
,~U"ING PE"~~APPLI4ATIQN
Property Owner:
Property Address:9~3p j70 iQp, ,S. Phone: 303 S3Y~ ~o os"
Contractor License No.:
Company: Phone:
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Buildina Dept. Valuation Figure: $
I hereby certify that the setback distances proposed by this permit application are
accurate, and do not violate applicable ordinances, rules or regulations of the City of
W heat Ridge or covenants, easements or restrictions of record; that all measurements
shown, and allegations made are accurate; that I have read and agree to abide by all
conditions printed on this application and that I assume full responsibility for
compliance with the W heat Ridge Building Code (I.B.C) and all o}her applicable Wheat
Ridge Ordinances, for work under this permit. Plans subJect to field inspection.
(O W NER)(CONTRACTOR):
(OW NER)(CONTRACTOR):PRINTED -DATE
Value:$
Permit Fee:$
Plan Review Fee:$
Use Tax:$
Total:$
Use of Space (description): / a <U~
Description of work: ~lL` Ya eu) Sg L( •
/
Sq.Ft.added
Expiration Date: Expiration Date: Expiration Date:
Approval: Approval: Approval:
(1) This permit was issued in accordance with the provisions set forth in your application and is subject to the laws of the State of
Colorado and to the Zoning Regulations and Building Codes of Wheat Ridge, Coloredo or anyother applicable ordinances of
the City.
(2) This permit shall expire if (A) the work authorized is not commenced within sixty (60) days from issue date or (B) the building
authorized is suspended or abandoned for a period of 180 days.
(3) If this permit expires, a new permit may be acquired for a fee of one-half the amount normally required, provided no changes
have been or will be made in the original plans and specif cations and any suspension or abandonment has not exceeded one
(1) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall be paid for a new permit.
(4) No work of any manner shall be done that wili change the natural flow of water causing a drainage problem.
(5) Contractor shall notify the Building Inspector hventy-four (24) hours in advance for all inspections and shall receive written
approval on inspection card before proceeding with successive phases of the job.
(6) The issuance of a permit or the approval of drawings and specifcations shall not be constmed to be a permit for, nor an
approval of, any violation of Ihe provisions of the building codes or any other ordinance, law, rule or regulation. All plan review
is subject ta field inspections.
Building Official
Electrical License No: Plumbing License No: Mechanical License No:
Company://q,y52*V ~cE~/cAVG Company: Company:
DEPARTMENT OF COMMUNITY DEVELOPMENT
7500WEST29thAVENUE BUILDING INSPECTION DIVISION
234-5933 P.O. BOX838 CITY OF WHEAT RIDGE, C0L0.
/ye- z;~
PERMIT N0. M944figillt
THIS PERMIT VALID ONLY WHEN SIGNED BY THE CNIEF BUILDING INSPECTOR AND RECEIPTED BELOW.
APPUCATION FOR MISCELLANEOUS PERMIT
JOBADDRESS/-~> ,-°70 P~t~ia OWNER 444 3~ ~~?k~ ~AN~UeASLc~
CONTRACTOR HR~ ~ II~•r~ ADDRESS ~Yoc
ADDRESS )-;73I 5-C/4A'ti}c~ Si PHONE 5'3`fJ°"S ZIPCODE b202
CITY ZIP CODE CONTRACT PRICE $~3y'i GUO o0
PHONE SnS I LICENSE NO.-~r DATE 22 5<p7 - ' `y`/
1. TVPE Ground❑ 1 J'n3Wall❑ Proiactinp❑ 01her SaDFOCe
2. MATERIAL Tofal Square FeN
SIGNS
3 ILLUMINATION YeS❑ No❑ TyDS ElKt. Parmif No.
4. SET BACK FROM PROPERTY LINE N_ 5_ E_ W Zons_ Apprwsd,ZOnslnspecta
(Spxify wnith ia frMl ) ❑ ❑ ❑ ❑ Diaopproved
1. TYPE Solid[:] Mon TAOn 80% ODen❑ Less Thon BO% Open
MATERIAL HsipM
FENCES
3. SET BACK FROM PROPER7Y LINE N_ 5_ E_ W 2ano_ Apprwed,Zorn Impeefa
(SDecify which ie }ront) ❑ ❑ ❑ ❑ DisopDroved
2 v
OTHER
3
.
DRAW SKETCH OR SHOW BELOW, THE FENCE,516N,OR OTHER STRUCTURE,GIVIIrv OISTANCES FROM PROPERTY LINES.
(SET84CN5 OR PROJECTIONS INCLUDED)
i +
J
Y
H
K
SPECIFV NORTM
~
N
STREET NAME
SHOW DISTANCES FROM THE MAIN BUILDING TPADJOINING HOUSES, STREETS, AND PROPERTY LINES; ON IRREGULAR LATS, SHOW LEAST
DISTANCE TO PROPERTY LINES,NOT MAXIMUM OR AVERAGE DISTANCE.
APPLICATION FOR PLUMBING; ELECTRICAL; MECHANICAL PERMIT
THIS APPLICATION WILL BECOME A PERMIT TO PERPORM THE INDICATED WORK ONLY UPON VALIDATION BY THE BUILDING INSPECTION DIVISION.
PERMIT WILL EXPIRE 180 DAVS FROM THE DATE OF ISSUANCE IF WORK IS NOT STARTED WITHIN THAT TIME.
ELECTRICAL PERMIT
STATE LICENSE N0.
PLUMBING PERMIT
S7ATE LICENSE N0.
MECHANICAL PERMIT
ALUMINUAAWIREUNDERSIZEBILIEGAL
FLOOR
BSM
IST
2ND
3RD
4TH
N0.
F11EUCi.cIeQwGos0IlROpara EleeSdo,
Np,
WATER CLASET
FORCED AIR - BTU
TEMPORARY METER
WASH BOWL
HOT WATER - BTU
NEW $ERVICE - AMPS
BATH TUB
STEAM - BTU
CHANGE SERVICE-AMPS
SHOWER
AIR CONDITIONINC-BTU
LIGHTING
SINN
OTHER
HEATING
GARBAGE DISP
REFRIGERATION SYSTEM
POWER SUB-CIFCUITS
WATER HEl+TER
Re}ri ernnf Gou
UTILI7Y(RANGE,DISPOSER,ETC.)
AUTO. WASHER
Pounds Char •
FIXTURES
DISH WASHER
AUTOMATIC SPRINNIER SVSTEM
WIRING MOTORS BiLONTROLS
FLOOR DRAIN
ELEVATOR
SIGNS
URINAL
TRGNSFORMERS 9 RECTFIERS
SEWERS
ADDITION TO OLD WORK
OTHER
MOTORS OVER I HP
TOTAL FI%TURES
I Aareby acknowledQe thot thia applica-
fion ia emroci ond undersfond thot I
wnnof srart tnis projeci until tnis oppli-
eation is aDProveE. I shall comply with
tM lowa oi tne Stote of Coloraao and to
}he Zoninp Repulotiona and Buildinp
Code of the City of Wheaf Ridpe. Any
violation of the above terme will cause
immediaie rev cr/tion of Inis permit
PERMIT FEE J~/ o . S~
USE TAX Q 8.G9e
TOTAL FEE $ Zi?
APPROVED ~ ~ ~✓G~~G
DISAPPROVED L
CHIEF BUILDING I SPECTOR,Cityof Wheaf Ridqe
Date Issued 3 ~r el
NOT
7U
CALL 234-5933
24 HOURS IN ADVANCE
FOR INSPECTIONS
Oplieanl~ pnnur•
i
Y
~
a
W
0 0
12
~
H
Z*>Z?,
V
o
m
~
~
a
o Z
u,
~ N u~ Z
WN O
V
~
N
~ ~
Q y ~
M
~
❑
N U
LO
r-i
F' V N
.0
❑
:3
O
7
a
05
U
~
U
pOE
~
N
`
; o
'1m
N
CD
~
~
Q
~
O
~
O
~
N
N
~
Q
d
~
co
°
Q
o
0
m
a
N
~
~
~
C o
a
`o
Q
~
N
d
N
~
N
C
C
O
O
N
~
~
`
O
V
j
~
~
a
m
~
N
N
C
O
C
•
Y
U
Q
V
~
O
O
N
dj
m
Z
3
co
❑
❑
❑
.
O
~
N
L
r^p
0
~ "J
F-
.
(L
~ c LL~
1b
f
U
~
W Z
O
U O
M
g
C Q ~
a y u o Z
~
❑
p dau-i
?~~nZ
-o
J .
W ~ r N O
~
~
N
> d "M ~
rn
o
U h N
-
❑
-
~
~
~
1 N
F' V N
Z N i ~
~
N ` ~
~
a
2.S V
❑
U
QOE
L)
N
\
a' 006
A
W
K
❑
t1~~
N
y
N
~
Q
~
O
~
C
O
U
N
a ~
a
c a
~
o Q
o I
a
v
a
a~
a ~
N ~
~
E c
0
U
~
d
y
C
v>
o ~
a~
N Cc
0 a a
v°"i a-°i c
C V O
y o 0
~ m Z
❑ ❑ ❑
~
°
v
E
N
m
.o
i
t
c
0
v
3
.
0
U
~
a
N
C
~
w
m
~
City of Wheat Ridge
Commercial Sign PERMIT - 060778
PERMIT NO:
060778
ISSUED:
08/25/2006
JOB ADDRESS:
9830 I-70 Fr Rd S
EXPIRES:
02/25/2008
DESCRIPTION:
wall sign 35 sq. feet + face
change on exist.
mon. sign
CONTACTS
gc 303/752-3120
SUSAN J. BRILLHART
06-0134 PLATTE
VALLEY SIGNS
owner 303/534-5005
Joe
Shames
Makovsky Realty
PARCEL INFO
ZONE CODE: C-1
USE: UA
SUBDIVISION: UA
BLOCK/LOT#: 0/
FEE SUMMARY
ESTIMATED
PROJECT VALUATION:
6,300.00
FEES
Permit Fee
181.10
Plan Review Fee
117.72
Total Valuation
•00
mo
Use Tax
113.40
TOTAL
412.22
Comments:
C-1 MR: 8/23/06
subject to field inspection
I hereby certify that the setback distances proposed by this permit application are accvra[e, and do no[ violate applicable
ordinances, rulea or regulations of the City of Wheat Aidge or mvenan[s, easements or restrictions of record; that all
measureme$ta shown, and allegatione made are accurate; that I have read and agree to abide by all condiCione printed on this
applicafr n and that I aeeume full reaponsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other
annlicabde Wheat RidqA0rcJjnancV3\(or work under this perPit. Ilans subject to field inspection.
Signat re of contra or cWner I _a~~
1. This permit was ed in accordance with the provisions eet forth in your application and is aubject to the laws of the
State of Colorado and to the Zoning Regulations and Huilding Codes of Wheat Ridge, Colorado or any other applicable
ordinancea of the City.
2. Thie permit shall expire if (A) the work authorized ie not commenced within sixty.(60) days from issue date or (B) the
building authorized is auspended or abandoned for a period of 180 days.
3. If this pezmit expires, a new permit may be acquired for a fee of one-half the amount normally required, prwided no
changee have been or will be made in the ori9inal plans and specificationa and any suspension or abandonment has not
exceeded one (1) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees sha11
be paid for a new permit.
4. No work of any manner ahall be done that will change the natural flow of water causing a drainage problem.
5. Contractor ahall notify the Building Inspectar twenty-four (24) hours in advance for all inspections and shall receive
written approval on inspection card before proceeding with successive phases of the job.
6. The iasuance of a permit or the approval of drawings and specifications shall not be conatrued to be a permit for, nor
an approval of, any vyaYJ2EYOn pf,^£heprovi s of the building codea or any other ordinance, law, rule or regulation.
All plan review ' "ctdefi5ld^s.
Signature of Chief Building Offical a11e
INSPBCTION REQUEST LINS: (303)234-5933 BUILDING OFFICE: (303)235-2855
REQUESTS MUST BE MADE BY 3PM ANY BUSINESS DAY FOR ZNSPECTION THE FOLLOWING BUSINESS DAY.
- - Plan Review
Clty of Wheat Rldge Builtling Permit Numher.
~ Community Development Department oeu:
~~w~ m h[IIVQR.___:.........~,
PxopertYAd&ess: F-%elY1pl0.0*1CQ5'
omcucor t;temlie xo.: 'Z;,4
Coodrib3r• 0,,,..,
OwNERItONTRAC70R SIGNATURE OF UNUERSTANDING MD pGREEYENT ~ B
I_
i hereby teAty thet Ne aelback distancas Dropo¢etl Ey this PennR applimtion are
yoWrate, antl tlo not vlolaW aDPlicable ordinencee,1ulea mropWationre M Na C"f
Wheat PjddelNBerrve~ummeseasonal ¢neccuroM,~n.etctieaeWwddudogrea eb'muBWeE~y~a~ll Ril mnaitiam printad on Mls appliwtlon and Uia! 1 aswme MI recponaibiilry fer Build gelt OMinancas e for h ~wfc Munda Ws ipemi~Pl~aro su ~ all
othar
tippliciabl 610~ b flaltl InaPectlo~+.
Rd
Use of Spece (description): IIGK?~^
Description of work: MOVll on
g4..t.oddod Front-af
Bf1II.DING
7ApprovM;
9: ~ \ " ❑ILNTS: IV al: ~
AQDroval:
Elecfrital License No:
Company:
Walls:
Eterias:
Plumbing License No:
Company:
Unib:
Mechanical Llcense No:
Company.
Ezpiration Date: Expiration Ilate: Fxpirafion Date:
p,ppravap ApprovaP Approval: _
(1) Thlepel iaouetllnexeMSneowlMNeDpNaieneeetfeMlnyourapplimtienanlieeuelcdrqqa4waefMCSt+bof
Coloretlo end to Iha Zening Reguletions anM Building Codea of Whrel Ritlge, Coloiatlo wenyafhrrappYCable ordinancea o(
meCiry.
(2) Thisoertnitshsllemireif(A7theworkaulMrIxetlisnotcanvnencaJVnthfnaixN(60) EaysfromiseuetlaFeor(B)MBbuAtling
authanzetl is suspended or e6andoned far a penod of 1gd tlays.
(3) Ifihi6Denlle%plrea.aneWpBfmlfmaybearyuiBdfarafeeofoneiuMUieemountnomtellyr94uired.piovidednochan3es
have bean orwill Ee made In ihe otlglnal plans end spetifiwtione and eny auspenWon or abanEOnmant has not excaeded one
(1) year. ItUlange6 nave OBen oFltausoerrswn or aGandonment eXaeetls ene (1)yE2t, tull tBl6 6nall bB p21a fof a new pnrmle
(4) No work of any mannerahall he done thet wili liange me naWrel ftow af vremr caucing e d2huge pro6lam.
(5) Contrecror shall notly tlhe Bulldlne Inspemr iwenRy-faur (24) houre in edvenee kr all In6pactlon5 and 6Mall rous, wnnen
sPGrovnl on InaPaetion aN bebre procxEiny wiN aursaadve Pluses. of tlhe lob.
(6) Tha issuanca ol a permit or tha aOProvel of amwings end spacfimtiona shall not bo conaoved m Ee a pwm~t foc nor an
eppmwi af, anyviola4on oftha provlslons of ine buiiEin9 oodes or anyothor ordlnance, law,'ule orregubtlon. All plan rwlew
Ls su[yeM lo fieltl Inspectlons.
Chief BuIlding Official
Fa.caA oyJ
tz FX Lz;,-a~~l
3oe)
'roa- 53y - 5~5
.303
Pmmit Fea:$
Plan Review Fee:$
sn Tpz.Q
TOS3t:$
^nnnnPl LaHers1Mojrrl on Raeeu)o.y
8uildin9 01a1M$4306`°)
; - go~ ~s~n Heasures flpproX as"
~
V
~
0
0
Wall Siqn Calculation Sheet
You must complete this sheet and inGude it in ttte submittal package fa'
any new wall signs. You will also need to create a site plan and a detail
sheet af 4he signage.
Project Address: ~b c3 '~'a 70 Contractor.
S~nlru~i Ka~
You are allowed 1 square foot of signage for every 1 linear foot of wall to which you are
attaching a sign.
All wall signs must be adjacent to a street ar major interior drive. ~
Step 1: Measure the length of the wall(s) where you are attaching the sign: CDYY~Q,J.~
~J
Wall 1- feet Wall 2- feel Wall 3- feet
Step 2: The length of the wall is the allowable square footage for the wall sign.
Wall 1 allowabla signage- ~ Square feet
Wa112 allowable signage- square feet
Wall 3 allowable signage- square feet
Site Plan
,r Eu~mpla ~u~+-e 'Rr~a
m . iv~"'~-'z~~ T
~
~ 1 I
J `
I. ~
. I ,Gsl'jPl" _
~
y f.. .
a
P?
L9
N
. . . . j -F ~ .
1 ~
j f'
1 ~
~ I
- ~ 71 1= [..~mEila
K ~ `r :p
14q~^
~ vl
~
4:_4
77 ~p f; ►
,
~
t
~
. f J
'p.,..~__. y
CID
:y .
~
~
~
cu ~
u
~ E i$ 7J
a ~ fA
W
~ 0
~r ~y H u o~ -
E 9~C ?
Fi E~ z 1F
~ fi A~7 7~7 .3
~x~s+
~ 3C r7 ~
Z # ~ ~
= "vw: 7F 6
ryM1 ~ m -
~
~
~
.
~
~
E'
i.
M
a.
~
i,
' .
~
6
r
,
i
~
0
~
Plafte Valley 51gr*
1321 S. Carson Way
Aurora, C:O 80012
3b3-752-3130 Fx 303-752•3286
g I a()~~
e-~Wvwb ptj~
i
Pa~'
I ~
gu'Q~
Permit Number
Building Permit 19546
CTTY OF WHEAT RIDGE 12/1/2005
7500 Weat 29TH Avenue
wheedage, Co 80033 Mspectlon Line
303-235-2855 ~'*'~~d~ ~ 303-234-5933
Commercial Miscellaneous
PROPERTY 9830 I-70 Fr Rd South Unit:
owxEx: Exempla Office Bldg (303) 298-7438
Description Removing wood siding on front of building, fraxning out & replacing w/ waterproof inembrane &
synthericstucco.
" V~
Units: Occupancy: Walls: Roof: Stories: Sq Fcet: 0
I heredy aMfy tlnt tbe wMUle dbhom proputl by thb perml[ applintbn art sceunh, aod de oot vbbte spPllcabk oedin.uep, roW or rqabtlom of He Gty af
Wh.tRidte or mveoaotF essroonb or raWCtl. of nmN; N.t .II mwuremmb ~howo, ~ntl ~Ileevtbv m~Ee art a~eunh: f6at 1 h.ve rcW mvd a{rte to abWe by
.11 cooAlqov ppo[M oe fhb ~pplkatbu, m4tbot 6uu tWl re ovlbNtyfor comPW^ce wIW the Wheat Ridse BuWloi Code (L.&C.) md a9 ol►er apptlnbk
WhutWy~eor .ka.JorworleuqpPermit.
~ /1.~:
1 U TWn pttsit wu Ipued iv ~aordaoa with Ne prov4bw s[ farth In your appHeatlon .d h rvbjec[ W the hw. of Ne Stafe o(Cobrada Ma M We 7adft
Reeabtlops utl BWNinp CoAe o( Wbeat IUdeS Colonao ar+ny o[hu applicabk orEinmcp of the Cfry.
S Erery permN WuM sM1all bewme lovalitl unka Ne wor4 0o IFe dh aothoriud by auch pemit Ie sammeneed wifhin 180 days sfter ka luueaa, ar Itthe woAc
autYOrtd w Ne YY Ly %wth permlt Y.urycnded or abmndoned fu . perbd of 180 dayi aftn Ne tlme of work Y mmmevsd.
3 If Nls pemdt esptiµ . vew permit moy be x9uiM t r o fee of oocluV Ne .ouoI normadtv requlred. Pr^vldM no sh.nee h.e bua or w1iEe .de Iv We
od~le~l plw ~nd ~pmllkoWa~ ~vd ~oy ~v~peoYOO or abandonmmt Aas not exttetletl ooe (i) yar. Itrh~oqa ~re m~tle or If eu~peetloe or Wudwnwl
uceedm oee (1) Yar. h11 fw Aa11 Ee PUd for ~ vew PermLL C ~NowohofmymmoerWYbetlooethatwWChwKNeamnllbwofwatercavsInC+dtV^ReProbk'°.
3. Contncror Yutl votl(y Ne BulWioe G.penor M<otydour (SQ houn 1n ~dvoee for .tl Wpmtiooe aed'F.tl rtctlv<~nen ~pprovd av byeetlov wd beforc
prneeedln xilY -a~n phuei of Ihe jo0.
6 7Le4wea tort or pv~iofdnwN depeM0ea11omchaYoo[be<ov[ruedtobecpermit(or,oarao~pprov~lof,urvbhtb.efthe
nrovkkua v oNe e, faw, ru4 or ntuh[bn.
Thursday, December 0 l, 2005 Page 1 of 1
Building Permit
CITY OF WHEAT RIDGE
9500 West 29TH Avenue
Wheatridge, CO 80033
303-235-2855
Comme
> vy
cuYO~um~,r~a~e ~ I
rcial Misce
Permit Number
19546
12/ 1 /2005
~ InspecNon Line
303-234-5933
llaneous
PROPERTY 9830 I-70 Fr Rd South Unit:
owNER: Exempla Office Bldg (303) 298-7438
Description
Removing wood siding on front of building framing out & replacing w/ waterproof inembrane &
syntheric stucca .
Authorized By Building Approval Zoning
Authorized On I1/29/2005 Approved By
Ok w/ notes. Subject ro field
inspection.
Authorized By Zoning Approval
Authorized On
Zoning C-1
Approved By
Ok Must obtain a separate permit
for signage.
Page 1 of l
Thursday, December Ol, 2005
~
COMMUNITY DEVELOPMENT DEPARTME14T Building Pertnit Number:
oFW"~Tq BUILDING INSPECTION LINE - 303-234-5933 Date:
~ g CITY OF WHEAT RIDGE
° 7500 WEST 29TH AVENUE .
WHEAT RIDGE, CO 80033 • (303-235-2855)
°~~~a"~~ ~ APPI.ICATION
• Property owner: y= m Pl,r1 iF'F 4 c r U l. i~-- pioperty Address: ~I a 3O S. 1- 7 10 '.7vcrv, c ei Ro,ko Phone: _3L) 3/ali',' -
Contractor License No.:
Co anv: ~
mr 3Ro~..~ --~cnR~~°rc~nq (+r-~ ~-C, Phone: 3'" /q35- zLi lS
OWNEWCONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I Buildlna Denf. Va/ua8on Figure: $/GC> oz.~'
I hereby certify that the setback distances proposed by this permitapplication are
accurate, and do not violate applicable ordinances, rules or regula8ons of the Ctty of
W heat Ridge or wvenanis, easements or restrictions of record; that aIl measurements
shown, and allegations made are accurete: that I have read and agree to abide by all
conditions printed on this applicatlon and that I assume full responslbility for
compliance v-nth the W heat Ridge Building Code (I.B.C) and all other applip6le W heat
Ridge flrdinances, for work under Nls permit. Plans subjed to field Inspectlon. ,
(O W NER)(CO NTRACTOR):
Z3
V 31UC: $
Permit Fee:$
Plan Review Fee:$
Use Tax:$
TOtal:$
Use of Space (description):
Descriptlon of work: •
La ,
M4.,,.,
Sq. Ft. added
BUII.DING DEPARTMENT USE ONLY SIC:
COMMEN7,S obta~ SQV.Xa'k*- -~O(
Approv :£I r~l~~`T'Ce~ J
Zoningi j v .
G COMMENTS: ~r ~ j f N`~ ~ •S ~
Approval: C OOP
10
Approyal:
DEPARTMENTCOMMENTS:
Approval:
Walls: Roof: Stories: Residentiai Units:
Electrical License No:
Company:
Plumbing License No:
Company:
17,
~XcrCl~t=Mechanical License No:
Company:
Expiration Date: Expiration Date: Expiration Date;
qpproval: Approval: Approval:
r
(i) This partnlt was issued In-accordance wlth the provislons set forth In your applicaGon and is su6jectto tha laws of the State of
Colorada and to the Zoning Regulations and Building Codes of Wheat Ridge, Coloredo or any other applicable ordinances of
the City. .
(2) This permit shall expire If (A) the work authorized is not commenced within sixty (90) days irom issue date or (B) the building
authorized is suspended or abandoned for a period of 180 days. .
(3) If this permit expires, a new parmit may be acquired for a fee of one-half the amount normally required, provided no changes
have been orwill be meda in the ortginal plans and specifica8ons and anysuspension or abandonment has not axceeded one
(1)year. If chan8es have baen or if suspenslon or abandonment exceeds one (1) year, fuli fees shall be paid for a new pertnit.
(q) No work of any manner shall be done that wlll change the natural flow of water causing a dralnage problam.
(5) Contractor shail notlfy the Butlding Inspector twenty-four (24) hours In advance for alt Inspections and shall recefve written
approval on Inspactlon card befire proceeding with successtva phases of the job.
(6) The Issuance of a permit or the approval of drawings and specifications shall not ba consWed to be a permit for, nor an
approvaiof,an vlolatlonofthe sionsofthebulldingcodesoranyotherordinance,law,ruieorreguiatlon.Allplanrevlew
Is su d inspe
Chiaf PjoWTrnri OfFlcial
^ , .n
~ . r... v, e ~ . ~ ' . " g-. kN:, ~y. .
Building Permit
C1TY OF WHEAT RIDGE
7500 West 29TH Avenue
Wheatridge, CO 80033
303-235-2855
ayavm~wna I,
Commercial Demolition
Permit Number
19526
11/23/2005
Inspection Line
303-234-5933
PROPERTY 9830 I-70 Fr Rd S Unit:
owNER: Exempla Office Bldg
Descrlption
Demo Pernvt request to remove siding (T-11) wood & fiaming on faGade to prepaze for new fapade.
~
Units: Occupancy: Walls: Roof:
Stories: Sq Fcet:
I haeby aNty Wat tM uAbuk dYlaww propoeed by tM1le permit apPUutlon an .ceuntq and do net vnleh apPlicabk oMbaaoeo, rub or rs{ulatbu af Ne Ciry o(
Whut R(tlge w rnveoanb, sumaob or ruWCtlom of rtcoN; that atl mawrtmeou ehown, and atlegaUo. made ve ~ccunte; tYat I Nve md mJ ~pee to Alde by
all aovditlow p1otM ov th4+ppliepbq ontl NaI I.wume fo mponel6Wry for rompWOa wIN the Wheat RItlCe Bulldlne Code (1..&C.) and aY ot4er ~pplkabk
Whwt Rylee or~_ ce+. y worlc /1 ~%~~_.i///JT -
l / t L-5'W
SIGN6D DA'fE
1 7'h4 penlt wu Ireed In ucordsore wltE Ne provWOw eel foM lo yoer ~pplk.tbn and ie sebjecc ro Ibe Wwe of the 6nh of CobrWO ud b tYe Zodae
R<gebatloon and BuWinL Code of Wheat Ritleq CWOndo or aoy other ~ppllc.ble orEbmea af ehe Ciry.
2 Svery pemtlk ivued dtll Uemme IovsNd uNw th<work oo Ne site mthwfud by rvcb pernift 1s rommmnd w1thN I80 tlayv Aer ifa Iuunoa, or If t0e warle
~nWOrkM m Me tlh by weh qnoit 4 Hupenddl or abaotloned far a perbd of 180 dap afla the Ume ofweeY Y eomwuneed.
3 V Nb pemilt exp4n, , new permit may b iryulrc4 tor a ttt ofooaWl(Me uoouot oormaliy rtqu4ed, prvv1EN no sh~nen h.v<beea or wN be made io the
oAeLUI plw and ryeAfis.fibav mG my svspeotlon or abarndonmeot su vat retceeded ooe (1) yuc ltchan¢n irc mnEe or If m. pmYOO w Waodoomml
exceM, we (1)Yev, Ntl fea shnll be pdd for . new ~lc
d NoworkofonYmonoaMaObedooetY~twNCh.tetheo~NnlMwotwaterc.win`odnlnoCeProbkm.
5 Couo-wror dbW notify the BuW1oL b+"bor tweoty-four (N) hoon io sEVUSe for .Y N~ptttlov+od ihall nalve wrlnev ~pprov'1 an ivryaliw wd befon
6 The imqavay~t o~lWarlppmvJ o(dnwuqriqa epeeifloaHOm sM1all eot bs mm[rtietl to be . pamit foq nor oo ~pprovJ o4 staY N^rtlw of We
SIGIi60DATE
WeAnesday, November 23, 2005 Page 1 of 1
COMMUNITY DEVELOPMENT DEPARTMENT
oF W"~'°T BUILDING INSPECTION LINE - 303-234-5933
~ ~o, CITY OF WHEAT RIDGE
~ 7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80033 - (303-235-2855) ~CORP ~ Ail`LlWlllQN
PropertyOwner:
pxoperty Address:
ContracWr License No.:
company: 6,1~)61,,, _
r/u/
Building Permit Number:
Date:
Phone:
Phone: (i~ ) 3u 31 43S -2Y 7S_
- C.. o; aZc, '3c y' 7SZs3
OWNEWCONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT I Buildinp Dept Valuation Figure: 3
roposed by this permit-appiication are
k distances
tb
th
p
e se
ac
I hereby certify that
accurete, and do notvlolate applicable ordinances, rules or regulatlons of the Ctty of
Wheat Ridge or covenants, easements or restrictlons of record;thatall measurements
V2lUe:$
shown, anA allegatlons mada are accurate; that I have read and agree to abfde by all
Permit Fee:$
.
conditions printed on thls applicatlon and that I assume full rasponsibility for
llance with the W heat Rldge Building Code (I.B.C) and all ofher applicable W heat
plan Review Fee:$
comp
Inspectlon.
d
Ridge Ordinances, for work under this permit. Plans subJect to fiel
Use Tax:$
/
/
(OWNER)(CONTRACTOR):SIGNEli E /x-wv
TOt3Il
kowrvenm Fv, - ,
Use of Space (description): !Vl~% c~2 C~ _y
Description of work: -f-
~ ~c~c
-fv lC'~mc,iK S~~Ptn (r-/r~ u;:,c,.•t' ~ fra„„t~~~
Sq.Ft added ~ c 'oL~- ~ c~r.~e_, -
IT BUIIJDINGDEPAR NT SEONLY SIC: Sq.Ft.:
Approval:
Zoning:
COMMENiS:
Approval:
FORKS COMMENTS:
Approyal:
IRE DEPARTMENT COMMENTS: I I
APpfOVal: ' .
Occupancy: Walls: Roof: Stories: Resfdential Units:
Electrlcal License No: Plumbing License No: Mechanical License No:
Company: Company: Company:
Expiration Date: Expiration Date: Expiration Date;
ppproval: Approval: Approval:
.
(1) This permitwas fssued inaccordance wlth the provisions setforth In your application and is subjectto the laws of the State of
Coloredo and to the Zonfng Ragulatlons and Building Codes of Wheat Ridpe, Coloredo or any other applicable ordinances of
the City. (p) This pertnit shall expire if (A) the work authorized is not commenced within sixty (90) days trom issue date or (B) tha buildinA
authodzed is suspended or abandoned for a pedod of 180 days. -
(3) If this permit expires, a new perznit may ba acquired for a fse of one-half tha amount nortnally required, provided no changes
have been orwlll be made in the originel plans and speciflcatlons and any suspension or abandonment has not exceeded one
. (i)year.Ifchangeshavebeanorlfsuspensionorabandonmentexceedsone(1)year,fullfeesshallbepaidforanewpartnit.
(4) No work of any manner shall be done thatwili chen8a tha natural Flow of water causing a drainaga problem.
(5) Contractor shall no8ry the Bullding Inspector twenty-four (24) hours In advance for all {nspectlons and shali recalva vrtitten
approval on inspection card befora proceeding with successiva phases of the Job.
(6) The Issuance of a permit or the approval of drewfngs and speciflcaHons shall not be consWed to be a permit for, nor an
approval of, anyviolatlon of the provlsions of tha bullding codes or any other ordinance, law, rule or regulation. All plan review
is subJect to fleld Inspections.
Ghir?f Ruildina Official
~
T
~
Certificate of Completion
AND/OR
Compliance
CITY OF WHEAT RIDGE
7500 W. 29TH AVENUE
WHEAT RIDGE, COLORADO 80215
THIS CERTIFICATE VERIFIES THAT THE PROPERTY DESCRIBED BELOW, DOES
COMPLY WITH THE WHEAT RIDGE BUILDING CODE, ZONING AND OTHER
RELATED LAND USE AND DEVELOPMENT LAWS OF THE CITY OF WHEAT RIDGE
FOR THE FOLLOWING PURPOSE.
PERMIT # 14675
Remodel - RAC (East Units)
OWNER: Lag B'Omer Part.. C/o S. Makovsky-ADDRESS: 9830 I-70 Fr. Rd. S.
CONTRACTOR: Williams Construction Corp.
DATE 4/7/03 CHIEF BUILDING
ZONING ADNIINIS'
I'D
INSPECTIONS WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE BUILDING SITE
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
a)28,
WHEAT RIDGE, COLORADO
7500 WEST 29th AVENUE (303) 234-5933
INSPECTION RECORD
JOB ADDRESS 74iSv Gv.1- /O F.rf.ol a~p ~~J
TYPE
BUILDING PERMIT N0, DATE ISSUED (O( it 4!SZ-
OWNER
CONTRACTOR LZeI !flv7sh 5
CE3.ss
~j c/
Coy
SETBACKSFROM PROPERTYLINES:
NORTH
SOUTH
EAST WEST
INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB
INSPECTION DATE INSPECTOR
Foundations
Footings
Caissons
Reinforcing or Monolithic
Weatherproofing
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED
Concrete Slab Floor:
Electrical (Ground Work)
Plumbing (Ground Work)
'
Heating (Ground Work)
n y/, DO NOTYgUR FLOOR UNTIL ABOVE HAS BEEN SIGNED
Rough E ctrical
Rough Plumbing
Air Test Gas Piping
'
Rough Heating & Ventilation
Framing
Insulation
Drywall Nailing ` 1-14
Roofing
Refrigeration
Electrical Underground
Final
Electrical
_0
Plumbing L
Heating & Ventilation
Frame
R.O.W. & Drainage
Fire Department
~
Parking & Landscaping
OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF
OCCUPANCY IS ISSUED
PROTECT THIS CARD FROM THE WEATHER
Certificate of Completion
AND/OR
Compliance
CITY OF WHEAT RIDGE
7500 W. 29TH AVENUE
WHEAT RIDGE, COLORADO 80215
THIS CERTIFICATE VERIFIES THAT THE PROPERTY DESCRIBED BELOW, DOES
RE AT D LAND USE AND DEVELOPMENT LAWS OF OTHE CIT O Y OF WHEAT RIDGE
FOR THE FOLLOWING PURPOSE.
PERMIT # 14675
Rehabilitation Center Remodel
OWNER:
CONTRACTOR: Williams Construction Co .
DATE 4/9/03 CHIEF BUILDING OFFICIA
ZONING ADMINISTRATOR
O
83H1tf3M 3Hl W08=1 QaV3 SIHl 103101id
a3nssi si AONddnooo
=10 31V31=111830 lllNfl a3111W83d lON JIONtldfloo0
6 idsospuej g 6ui~asd
o luawl~edaa a~i~
r(o
a6euisja g 'M'O'Fi
d G/
!~i
o ZO 07 ,'rr awmj
uoileyluaA g 6uileaH
6uiqwnid
-
~7
?o i Z~ , ~eoulaal3
~
lew j
puna6aapun leou10913 'i
uoilma6upa
6uilooa
6uilisN Ilenv(iQ
uoilelnsul
6uiwea~
blbF ~
Fh"
,
.
z
uoilaIiluaA Ig 6wye8H y6nod
6uidid seE) isal jiy
pjl
e 6uiqwnld y6nod
jeoialoa y6nod
O3NUS N338 SVH 3n08V IIlNnFJOO-ijki(led~-'YOnJ dQ'tl-(/ W~ ~
(~joM punao) 6uileaH
d (~joM punaE)) 6wqwnld
(~joM punaE)) leoul0013
aoolzi 9EIS alaAouoo
O3NJIS N338 St/H 3A08V IIlNn313a3N03 OnJ dflOd
6wloadaaylea/N
oiyl!louoW ao 6uioao;waa
suossieo
s6wlooA
suoilepunoj
dOl33dSNI I 31VQ I N01103dSNj
80f SIHl Ol eJNINIb'la3d S33VdS TlV NeJIS 1Sf1W a0103dSNI
1S3M 1SV3 H1f10S H1HON ~S3NIl A1FJ3dOFJd WOkij SNOV813S
~
aE1033H N01133dSN
££65-b£Z (EOE)
3f1N3Ad 416Z 1S3M 0051
Oavu0=l0o`3Jaw lV3HM
SN01133dSNl a0-A Q3a1f103a 33IlON Saf10H tpZ
311S JNlallfl8 3Hl NO a31SOd SI abVO SIHl
SS3lNf1 3aVW 38 lON IIIM SN01103dSNl
Certificate of Completion
AND/OR
Compliance
CITY OF WHEAT RIDGE
7500 W. 29TH AVENUE
' WHEAT RIDGE, COLORADO 80215
THIS CERTIFICATE VERIFIES THAT THE PROPERTY DESCRIBED BELOW, DOES
COMPLY WITH THE WHEAT RIDGE BUILDING CODE, ZONING AND OTHER
RELATED LAND USE AND DEVELOPMENT LAWS OF THE CITY OF WHEAT RIDGE
FOR THE FOLLOWING PURPOSE.
PERMIT # 13510
Office/Warehouse "Shell Only"
OWNER: RW Holdings ADDRESS: 11919 W. I-70 Fr. Rd. North
PROPERTY ADDRESS: 11919 W I-70 Fr. Rd North Wheat Ridge CO 80033
CONTRACTOR: MDR DesiQns LLC
DATE 4/25/04 CHIEF BLTILDING OFFICIAL
ZONING ADMINISTRATOR
0
,
INSPECTIONS WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE BUILDING SITE
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
WHEAT RIDGE, COLORADO
7500 WEST 29th AVENUE (303) 234-5933
INSPECTION RECORD
JOB ADDRESS
BUILDING PE~RMIT N0. DATE ISSUED OCCUPAN
nwuoo GJ /t , I.~ z' /
CONTRACTOR l L ! L . ) iLf ~
SETBACKS FROM PROPERTY LINES: NORTH
SOUTH EAST WEST
INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB
INSPECTION
DATE
INSPECTOR
Foundations
Footings
Caissons
Reinforcing or Monolithic
Weatherproofing
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED
. •,Concrete Slab Floor. r. . , ~ ~ Lf" ~ - - ~ i~a : ~ ; r , • -
Electrical (Ground Work)
Plumbing (Ground Work)
z.
Heating (Ground Work)
DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED
Rough Electrical ' i Lt k >
Rough Plumbing 3/
Air Test Gas Piping V
Rough Heating & Ventilation
(above must be signed prior to framing inspection)
= e~ od
Framing
Insulation
Drywall nailin9 tw- 1
w
Roofing
Refrigeration
Electrical underground
Finai
Electrical ~r
-z r0
Plumbin
Heatin & Ventiiation
c ~
Frame
R.O.W. & Drainage
Fire Department
Parking & Landscaping
C~•
OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF
OCCUPANCY IS ISSUED
PROTECT THiS CARD FFiONi THE WEATHER
f; 1
T[i~
n.:~~
qTpla
CONSTRUCTION CHANGE DIRECTIVE
O WNER
ARCHITECT
CONTRACTOR
FIELD
OTHER
PROJECT:
(Name, address)
Exempla Lutheran Rehabilitation Center
9830 west I-70 Service Road
Wheat Ridge, CO 80033
TO CONTRACTOR:
(Name, Address)
Williams Constmction
955 S. Kipling Parkway
Lakewood, CO 80226
DIRECTIVE NO:
DATE:
Ol
February 25, 2003
ARCHITECT'S PROJECT NO: 104-1300-17603
CONTRACT DATE:
CONTRACT FOR: GENERAL CONSTRUCTION
Yoa are herb directed to make the followin chan e(s) to the conlract:
Move the exterior doot in the south wall of the building to the western most structural bay, thereby missing the lateral
bracing.
/
PROPOSED ADJUSTMENTS
1. The proposed basis of adjustment to the Contract Sum or Guaranteed Maximum Price is:
❑ Lump Sum (ioccease) (decrease) of $
❑ Unit Price of $ per
,J/ As provided in Subparagraph 73.6 of AIA Document A201, 1997 editic
❑ As follows:
2. The Contract time is proposed to (be adjusted)(remain unchanged). The proposed adjustmeny if any is (au increase of
days) (a decrease of days).
When signed by the Ownec and Architect, Received by the Contractor, this document becomes effective immediately as a Construction Change
Direc[ive (CCD) and the Contractor shall proceed with the changes as described above.
Exemnla Facili[ies Manaeement
ARCHITECT
Tana Morales
B
~
DATE:
OWNER
CONTRACTOR
BY Q "~BY -
DATE: DATE:
~
Z
~
0
5
W
V
W
~R
V
O
Q
7
Ln
°
~
a ~
`
_
b
C')
w
0
N
a
M~
"v' O
~
~
i
U
O
~
'O >
C O
e0 Of
d ;
N R
d r
~
G N
d y
L ~
M
C cc
i U
' o
~
Y C
N .0
N A
« 0
.5
d rn
~ c
y O
C p
y T ~
~ R d
l0 9 Y ~
y 9
N
O ~ OI
J ~ y C
0 Ltd
N
C
O
r
F
O
>
C O
O v
01 y
yl y
C
r w
d V
~
o 4)
V.a
m
E
C
n
o >
c 0
T =
d C
d O
L V
d y
W 0
~i
~ d
L
3
i
rn
c
v
~
m
0
r
G
F
W
>
w
~
O
0
p
¢
3
¢
LL
~183o w I-~o
Exemrila
pr: r r, 1 r t; c aR e
Addendum #02
PRO.JECT: ELRC Renovation, 2002
DATE: December 9. 2002
This Addendum beconles part of the Contract Documents and shall be acknowledged on the Bid
Porm. All parts of the original specifications and drawings shall remain in force except as noted
below:
DRAWINGS
►TEM 1: Sheet A2.1
Relocate demising wall to utilize existing partition. Maintain I-hour construction per partition A3S see
attachment A2.
ITEM 2: Sheet A2.1
Omit new door from Treatment, room no. 303. See Sheet A3 for egress study.
End of Addendum #02
Tana M. *
1Aorrln
306742 ,
IZIq
Page I of I Addendum 401
NEW CONSTRUCTION PLAN
SCALE: 1/8" = 1'-0"
ELRC RENOVATION, 2002
EXEMPLA Healthcare
PnGE
sHEer PARTIAL FLOOR PLAN
No.
XEMPLA LUTHERAN REHAB CENTER
C
Facilities Management Dept.
A2
ROAD
DETAIL 01/n2.1
,
9830 WEST I-70 FRONTAGE
8300 WEST 38TH AVENUE
.
WHEAT RIDGE, CO 80033
NhiEAT RIDGE, CO 80033
DATE 12/9/02
T
am
m
~
r
D
Z
~ ~ 7 0
a ~ i 9
I
~
~ D
mn y 0
A
pp D
mm n
~
N~ y
m~ i
c y
A
in o
I ~
m
a
n
0
I
~
I I
(
z
Ci 4i
Ci
ei
z
m
K
9~
C9
!
i ~
1
1
$
-
i
r
'
M
M
E
~
~
r
~
v
O
y
P
~
~
O
O
~
~
P
~
p
P
~
e
~
~
b
~
d
d
d
~
~
'
e
~
S
~
e
d
~
~
i
>
ELFC RENOVATION, 3002
Center
h
b
R
h
w aw wwms1'..19'v.
W
a
o
\
a
.
e
eran
Exempla Lut
9830 Went I-70 Fronlage Road, 1Mmt RiEge. CO 80033
aae-swe
EXEMPLA Healthcare
fAflllflfSMallagC111Cl1f nlpl.
1/1
eeao wESr i-io raoHTncE aano
~
WMEAiRIDGECOLORAOO800J3
Z
(303)425-2100 F/~X4fi]d85<
r
~
L
~
~
0
Z
~
~
J
W
/W~
N Q
M W
N =
M U.
o
V
•
t
W
V
~
pp-
c
O
W
L
V
q
~
`J
l~0
d
~
0
J
a
O
M1.1
v >
C O
10 OI
N N
d 3
N m
d ~
a~
d
~
d~
r
Y C
(a
c ~
l0
V V
Y Q
~ c
M
N o
W ~
O
>
d rn
~ c
ao
w _
c o
~ L
42 E
r C ~
> F ~
l0 y C
L > C
t d
OJ
C
O
Y
N
O
>
C O
rn~
d FL
w c
GI L
Y O
~ v
`o d
U 9
« £
c
a~ d
Y= a
o >
c W
t
a
~ c
L
d
V L
~ O
:3 U
>0 d
r
3
~a
el
~
c
9
m
a
M
C
H
W
0
W
~
H
Z
G
~
3
¢
0
Arvada Fire Protection District , g
~W-
Division ot Fire Prevention Review Comments
Plan ~ ~ ~
Date: Reviewed 8y• ~
Name Of Project:
Address:
Occupancy Class:!E~ g~ Footage
2. Exits:
Sprinicier System Yes No Fire Alarm System Yes ~
1. site:
1• " The address shall be posted on a s and
temporary basi
shall be permanently affixed to ilding in a
the bu
minimum of 4 inch numbers on a cting background.
ontras
UFC 97 901.4.4. Amended.
1• Exit doors in Group B, F, M, and S
provided with a key locking device
with a sign stating, "THIS DOOR IS
DURING BUSINESS HOURS. iF FOUND Lpi
DEPT. Signs are available from the
Charge.
UFC 97 1207.3. Amended.
Occupancies that are
shall be provided
TO REMAIN UNLOCKED
~-KED> CALL THE FIRE
Fire Dept. at No
2• When exit doors are used in pairs they shali ogen with
one operation. Edge or surface mounted flush bolts are
prohibited.
jlFC 97 1207.3
/
3. ~ Remaining exit doors shall be openable from the inside
without the use of lcey or special knowledge.
UFC 97 1207.3
4• Exit doors shall swing in the direction of exit travel
when serving any hazardous area or serving an occupant
load of more than 50 persons.
{JFC 97 1207.2.
5• Exit doors shall be distinguishable from adjacent
construction.
UFC 97 1207.6
7300 Kipling Street • Arvpda, Colorado 80005-3876 •(303) 463-7655 • Fax (303) 422-5549
Page Two
3. Corridors:
1. Exit corridors and openings shall be installed in
accordance with the Building Code.
UFC 97 1209.
4. Exit Signs:
1. Exit signs with battery back-up shall be installed at
required exit doorways and where necessary to clearly
indicate the direction of exit egress where the exit
serves an occupant load of 50 or more.
UFC 97 1212.3.
2. Provide additional exit signs at the following
locations. UFC 97 1212.3
3. \/Exit signs shown on the plans shall be subject to field
inspection. Additional signs may be required.
UFC 97 1212.3.
5. 7rovide ncy Lighting:
1. emergency lighting by night light or battery
pack units for an occupant load of 100 persons or less.
UFC 97 1211.1
2. Provide emergency lighting by battery pack units as the
occupant load exceeds 100 persons.
UFC 97 1211.1.
3. Emergency lighting shall be subject to field inspection.
Additional units may be required.
UFC 97 1211.1.
6. Fire tinguisher's:
1. Fire extinguisher's
10-1b ABC dry chemi
Office for number o
UFC 97 1002.1. Amen
7. Fire Protection Systems:
shall be a minimum of a 4-A rated,
cal unit. Contact the Fire Marshal's
f units and mounting locations.
ded.
1. Changes to the sprinkler system may be required due to
construction. A minimum of three sets of sprinkler plans
shall be submitted for review and comment prior to work
commencing. UFC 97 1001.5.1.
Page Three
2. work performed on sprinkler systems shall be from a State
of Colorado licensed sprinkler contractor.
3. A separate permit will be required to be obtained from the
City of Arvada Building Department.
8. Fire Detection and Alarm Systems:
1. Changes to the fire alarm system may be required due to
construction. Submit a minimum of three sets of plans
for review and comment prior to work commencing.
UFC 97 1007.3.1.
2. A separate permit for fire alarm system changes will need
to be obtained from the City of Arvada Building
Department.
9. Electr'cal:
1._~ The owner needs to verify that sufficient electrical
receptacles have been provided as extension cords and
multiple adapters are not permitted, nor shall flexible
cords pass through walls, ceilings or doorways.
UFC 97 8506.3
2. Electrical disconnects shall be labeled with address and
unit number when instalied with multiple units.
UFC 97 8509.3.1. Amended.
3. Provide locks on circuit breakers providing power to
exit signs and night lights as specified in the
Electrical Code.
10. Gas Meters:
1. Gas meters shall be protected when subject to vehicle
damage.
UFC 97 1106.
2. Gas meters shall be identified as to the address and unit
number.
UFC 97 1106 Amended.
11. Inter;or Finish:
~
1. Carpeting shall be a minimum of a Class II Critical
Radiant Flux and documentation shall be provided prior
to installation.
UFC 97 Appendix IV-A.
Page Four
12. _ Additional Comments
11
13, v Any code requirements arising from construction will be
ddressed.
14. These comments shall remain with the approved plans at
he construction site.
15. Vx"C'ontact the Fire Marshal's Office at 43~ for
questions or additional information.
16. 7tions:
1. enty four hours notice
UFC 97 103.2.2.
is required for all inspections.
DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : 14675
BUILDING INSPECTION DIVISION - 235-2855 Date : 10/21/02
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215
Property Owner: LAG B'OMER PART., C/O S. MAKOVSKY
Property Address: 9830 W. I-70 FRNTGE RD. S.
Contractor License No. : 21396
Phone : 534-5005
Company : W ILLIAMS CONSTRUCTOIN CORP. Phone : 303-989-9009
OW NER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this pertnil application are accurate, and
do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or
covenants, easements or restrictions of record; that all measurements shown, and allegations
made are accurate; thal I have read and agree to abide by all conditions printed on this
application, and that I assume full responsibility for compliance with the Wheat Rid9e Building
Code (U.B.C.) and all other applica t Rid r' ces, for work under this permit.
(OWNER)(CONTRACTOR) SIGNEble DATEi0A2Q-L
Construction Value :
$80,000.00
Permit Fee :
$$53.75
Plan Review Fee :
$554.94
Use Tax :
$960.00
Total:
$2,368.69
Use:
Description : REHABILITATION CENTER REMODEL. REMOVE SHOWERS, ADD LAB, NEW FINISHES
BUILDING DEPARTMENT USE ONLY
:
Z6rii66,1COnma"Wh,. SIC: Sq. Ft.
Approval :
Zoning :
8~~~~64,00(:f' OK PER REDLINES
Approval: DM
,~I bticaMarl~$f~S'o~arrts';;
Approval :
Occupancy : Walls : Roof : Stories : Residential Units :
Electrical License No : 21417
Company:CUSTOM ELECTRICAL
CONTRACTORS
Expiration Date : 2/28/03
Approval :
Plumbing License No :18317
Company : Frontier Mechanical, Inc.
Expiration Date : 6/27I03
Approval :
Mechanical License No : 18317
Company : Frontier Mechanical,
Inc.
Expiration Date : 6/27/03
Approval:
(1) This permit was issued in accordance with the provisions set forth in yopur application and is subject to the laws of the State of Goloreao ano io me coning
Regulations and Building Code of Wheat Ritlge, Colorado or any other aOPlicable ordinances of ihe City. (2) This permit shall expire if (A) the work authorized is not commenced wilhin sixty (60) days from issue date or (B) the building authorizetl is susDended or
abandoned for a penod of 120 days.
(3) If this permit expires, a new permit may be acquired for a fee ot one-half the amount normally required, provided no changes have been or will be made in the
original plans and specifications and any suspension or abandonment has not exceeded one (7) year. If changes are made or if suspension or abandonment
ezceeds one (1) year, fu0 fees shall be paitl for a new permit.
(4) No work of any manner shall be done lhal will change the naNral Flow of water causing a drainage problem.
(5) Contrector shall notify the Building Inspector hvenry-four (24) hours in advance for all inspections and shall receive wrinen approval on inspection wrd before
proceediing with successive phases of the lob.
(6) The issuance of a PS" or ihe approval of drawings and specifcations shall not be construed to be a permit (or, nor an approval o(, any violation of the
provisions of t in cod r other ordinance, law, rule or regulation.
ChieFBu ' Irupeda'
THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR
CALL: 234-5933 24 HOURS PRIOR TO INSPECTION
Auilding Pennit Application
City of Wheat Ridge
Builtling PermitApplication
idepartment of Planning and Development
Building Inspection Line: 303.234.5933
~
Building Peimit Number:
Gty of W heat Ridge
;7500 West 29th Avenue
Wheat Ridge, CO 80215 303.235.2855
/
Date: 6~
/
,
Property Owner Jprx~- fne-YSlf,.jo `'ju SAaw~ vsk-~✓
_
:
Phone: f,~-S3y- va 5
'Property Address: i70 re";-Az;,e- (2-b
Contractor License No:
~panY: `(%a,v~r5
Pnone:
_._._:~W __._._w WWW______WW_____.mWW___. :W W
EOWNER/CONTRACTOR SIGNATURE aP UNDERSTANDING AND RGREEMENT
>:I hereby certify that the setback distances proposed by'this permit application are accurate,
;
and do notviolate applicable ordinances, rulesj or regulations of the City of Wheat Ridge or
COnStrUCtiOn VdIU@:
covenants, easements or restrictions of record; that all measurements shown, and
ll
m
d
e ac
t
Ehat I h
e read
d
l c
d
~S-~~ 7-5
Pel'fillt Fe2;
;a
egations
a
e ar
cura
e;
av
an
agree to abideby al
onditions printe
.
;
on this applications and that I assume full responsibility for compliance with the Wheat
PI811 R viPw Fee:
EtST
Ridge Building Code (U.B.C.) and all other applicable Wheat Ridge Ordinances, for work
USe TBx:
iunder tfris permit.
Total.
€(OWN CONTRACTOR) IGN
.
,
;Descnption: /K
¢lw~r+ a .2ss+o%C `.i
Q~ot
d a~
~
W_...::.~......_
_
.
.
- - Building Department Use Only
.
.
.
_
-
EZOning Comments:
?SIC: Sq.Ft.:
;Apprmal:
ti
Zoning: _
?I'dZ
!Buildin
Comments
O~L Cf' ~~i~Lt
IO
r- EC~
g
s
:
I
•
~
.
?APProvaL
`Public Works Comments:
!iAPprovaL• '
\ c~
-
Eiectrical Ucense No:
Plwnbing License No: MeChanical License No: {~~7
/
iCompany: 3
,
Company-'~ ~1G~iict~I.~s~;Company:~~.Y.r~eG~cvr7ic
T'
Expiration Date: =
; ;
•
Expiration Date: - ;F~cpiration Date:
ApprovaL ' iAPprovaL
APprovaL
(1) This pertnit was issued in acwrdance.with the pYOVisions set fath in yourapplicahon and is subject to tfie"laws"oT Ehe State oi Colorado and to the Zoning
Regulahons and Building Code of Wheat Ridge, Colaredo or any other applicable ordinances of the City. . (2) This permit sfiall ezpire if (A) the work authqnzed is nnt commenced within sizty (60) days from issue date or (8) tliebuilding authorized is suspended or
abandoned for a periotl of 120'days. '
w
fle:!//El/wwwrootlcitydev/building_percnit_application.htm (1 of 2) [7/2/2002 1022:41 AM]
Building Yexmit Application
(3) If this permit expires, anew permit maybe acquired fot a fee of one-half the amountoortnally reqwred, providednochaoges have been orwill'.bemade in the----
original plans and specifications and any suspension or abandonment has not exceeded one (1) year. If changes have been made or if suspension or_
abandonment exceeds one (i) year, full fees sHall be paid for a new permil.
(4) No work of any manner shall be done that will change the natural flow of water causing a drainage problem. . .
(5) Conhactor shall notiry the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive written approval on inspechon card befwe
proceedingwim successive phases oi tfhejob
(6) The issuance of a perrnit or ihe approval of drawings and specifications shall not be construed to be a permit fee, nor an-i.,approval of, any vwlation oi the'.
provisions of the huilding codes w any oiher ordinance, law, rule or regulation.
Chief Building Inspector
file:///El/wwwroot/citydev/building_permit. application.htm (2 of 2) [7/212002 1022:41 AM]
ExemDla
8300 West 38th Avenue
Wheat Ridge CO, 80033
October 10, 2002
In reply to: Phone message on October 9, 2002
Darin Morgan
City of Wheat Ridge, Planning & Development
Wheat Ridge Municipal Building
7500 W. 29th Avenue
Wheat Ridge, CO 80215-6713
Deaz Darin:
Subject: Exempla Lutheran Rehabilitation Center
This letter is in response to your request for a signed agreement that both tenants will not lock
the door between the suites, as it is a required means of egress from the Exempla Lutheran
Rehabilitation Center into the Rehabilitation Associates of Colorado suite.
The door currently has a passage latchset that cannot be locked, and there is no intention to
install a locking device of any kind on the door in the future.
Name Printed
Lvi C - u/2-11~
E e pla Lu ran Rehabilitation enter
6"J-0-
Associates of Colorado
CC: Facilities City Correspondance File
Exempla
8300 West 38th Avenue
Wheat Ridge CO, 80033
October 4, 2002
In reply to: Review Comments dated ] 0/04/02
City of Wheat Ridge, Planning & Development
Wheat Ridge Municipal Building
7500 W. 29th Avenue
Wheat Ridge, CO 80215-6713
To Whom It May Concern:
Subject: Exempla Lutheran Rehabilitation Center
This letter is in response to your comment, regarding the door between tenants not swinging in
the direction of egress. To darify, this is a pre-existing tenant separation that we aze reducing in
size. We are not attempting to create a new separation on this side of the building. The door in
question has a passage latchset, incapable of locking. In reviewing, NFPA 5-2.1.43, clearly
states that the door should open in the direction oF egress when used as an exit enclosure and the
following section 5-2.1.4.4 states that the door will not obstruct the width of a corridor by more
than one-half the width, I fully understand the position that you are taking. I find that NFPA 5-
2.4.3.6 states "Swinging fire doors shall be permitted in horizontal exits provided..." , with the
following exception:
Exception No 2.: Horizontal exit doors in corridors no greater than 6 ft (182 cm) wide in
existing buildings.
Since this is a pre-existing condition, and by swinging the door in the direction of egress, would
create potential hazard for patients entering exam rooms, without significant redesign of the
suite, I am asking that you consider the existing door be allowed to remain as is.
Your prompt reply is greatly appreciated.
Respectfully,
Tana Morales
Facility Architect
Exempla Healthcare
cc: File
Arvada Fire Protection District
Division of Fire Prevention
Plan Review Comments
Date:
Reviewed
Sy:
Name Of
Project: Fr
cuv.~\ L-N
, , ~ "r~~ `
Add re s s: 7"7 c`
Occupancy Class: 0) Square Footage \1.--~c: 13
SpriniCier System Yes ~NO Fire Alarm System Yes No
1. Site:
1.-Z The address shali be posted on a temporary basis and
shall be permanently affixed to the building in a
minimum of 4 inch numbers on a contrasting background.
UFC 97 901.4.4. Amended.
2. Exits:
1.__ZExit doors in Group B, F, M, and S Occupancies that are
provided with a key locking device shall be provided
with a sign stating, "THIS DOOR IS TO REMAIN UNLOCKED
DURING BUSIPIESS HOURS. IF FO{JND LOCKED, CALL THE FIRE
DEPT. Signs are available from the Fire Dept. at No
Charge.
UFC 97 1207.3. Amended.
2, V When exit doors are used in pairs they shall open with
one operation. Edge or surface mounted flush bolts are
prohibited.
UFC 97 1207.3
3. V Remaining exit doors shall be openable from the inside
without the use of key or special icnowledge.
UFC 97 1207.3
4.Exit doors shall swing in the direction of exit travel
when serving any hazardous area or serving an occupant
load of more than 50 persons.
UFC 97 1207.2.
5. Exit doors shall be distinguishable from adjacent
construction.
UFC 97 1207.6
7300 Kipling Street • Arvada, Colorado 80005-3876 •(303) 463-7655 • Fax (303) 422-5549
Page Two
3. Corridors:
1. Exit corridors
accordance with
UFC 97 1209.
and openings shall be installed in
the Building Code.
4. Exit Signs:
1. V Exit signs with battery back-up shall be installed at
required exit doorways and where necessary to clearly
indicate the direction of exit egress where the exit
serves an occupant load of 50 or more.
UFC 97 1212.3.
2. Provide additional exit signs at the following
locations. UFC 97 1212.3
3. VZ Exit signs shown on the plans shall be subject to field
inspection. Additional signs may be required.
UFC 97 1212.3.
5. Emergency Lighting:
1. V Provide emergency lighting by night light or battery
pack units for an occupant load of 100 persons or less.
UFC 97 1211.1
2. Provide emergency lighting by battery pack units as the
occupant load exceeds 100 persons.
11FC 97 1211.1.
/
3. Emergency lighting shall be subject to field inspection.
Additional units may be required.
UFC 97 1211.1.
6. Fire,.Extinguisher's:
1. v,Fire extinguisher's shall be a minimum of a 4-A rated,
10-1b ABC dry chemical unit. Contact the Fire Marshal's
Office for number of units and mounting locations.
UFC 97 1002.1. Amended.
7. Fire Protection Systems:
1. Changes to the sprinkler system may be required due to
construction. A minimum of three sets of sprinkler plans
shall be submitted for review and comment prior to work
commencing. UFC 97 1001.5.1.
Page Three
2. Work performed on sprinkler systems shall be from a State
of Colorado licensed sprinkler contractor.
3. A separate permit will be required to be obtained from the
City of Arvada Building Department.
8. Fire Detection and Alarm Systems:
1. Changes to the fire alarm system may be required due to
construction. Submit a minimum oF three sets of plans
for review and canment prior to work commencing.
UFC 97 1007.3.1.
2. A separate permit for fire alarm system changes will need
to be obtained from the City of Arvada Building
Department.
9. Eiectricai:
1._'\!!f~The owner needs to verify that sufficient electrical
receptacles have been provided as extension cords and
multiple adapters are not permitted, nor shall flexible
cords pass through walis, ceilings or doorways.
UFC 97 8506.3
2• Electrical disconnects shall be labeled with address and
unit number when installed with multiple units.
UFC 97 8509.3.1. Amended.
3• V Provide locks on circuit breakers providing power to
exit signs and night lights as specified in the
Electrical Code.
10. Gas Meters:
1. Gas meters shall be protected when subject to vehicle
damage.
UFC 97 1106.
2. Gas meters shall be identified as to the address and unit
number.
UFC 97 1106 Amended.
il. Interior Finish:
1. V Carpeting shall be a minimum of a Class II Critical
Radiant Flur and documentation shall be provided prior
to installation.
UFC 97 Appendix IV-A.
Page Four
12. Additional Comments:
13. v Any code requirements arising from construction will be
addressed.
14.~ve,,~ These comments shall remain with the approved plans at
the construction site.
15.vz Contact the Fire Marshal's Office at 425-0850 for
questions or additional information.
16. Inspections:
1.~Twenty four hours notice is required for all inspections.
UFC 97 103.2.2.
09/17/2002 13:05
~
3038068060
RFCF~~E'n ,1'11!_ 0 1 2eo2
FRONTIER MECHANICUL
PAGE 01/01
~1-ORADO 80215
I 1 Ir~f " t ~I IBrMd!Y a v, , r 1, ny ~ l
Company : Frontier Mech~inical, Inc. CityLic: 18317
~ Address: 2771 W. Mansfield Ave Phone:806-5400
i City: Engiewood Stata CO Zip: 80110 Pax : 806-8060
I Date Issued : 6/27/02
~ Type of License:
~ ExplraEion Date : 6/27103
~ Hea6ng & Ventilation ConU'actor
Plumbing Contrador ~
~ CHIEF BUILDING INSPECTOR
CITY OF WIEqT RIDGE
06/21/02 3:07 P11 cdh
Frontier 17eclwnical
Frontier Mechanical, Inc.
2771 W. Mansfield Ave
Englewood, CO 60110
RECEIPT NO:COLa`M
. pUNr
Ft1SD CONTRACTOR'S LIfFTlSE
75.90
FtISD CANTRiC7DR'S LICBVSE
75.00
VAYHElVT RECEIVED plww
CK 67105 150.00
rora. iso. o0
. DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : 14606
BUILDING INSPECTION DIVISION - 235-2855
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215
Date : 10/8/02
Property Owner: R.A.C.
Property Address : 9830 I-70 FRONTAGE RD S.
Contractor License No. : 18363
Company : Williams Construction Corp.
Phone : 316-0900
Phone : 233 2145
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by lhis permit application are accurate, and
do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or
covenants, easements or restrictions of record; that all measurements shown, and allegations
made are accurate; that I have read and agree to abide by all conditions printed on this
application, and that I assume full responsibility for compliance with the Wheat Ridge Building
Code (U.B.C.) and all other applicable Whea ;Ritl9e orcJiqances, for work under this permit.
(OWNER)(CONTRACTOR) SIGNED DATE C'lil-Cn✓
Description : TENANT FINISH, ONE OFFICE, ONE RESTROOM
Construction Value :
$27,000.00
Permit Fee :
$411.95
Plan Review Fee :
$267.77
Use Tax :
$324.00
Total:
$1,003.72
Use :
BUILDING DEPARTMENT USE ONLY
xonirig.CCmments;SIC : Sq. Ft. :
Approval :
Zoning :
Buildir~g Cpjinments:
Approval : DM 10/8I02
PubItcVllorks eqmrqents;;
Approval:
Occupancy : Walls : Roof : Stories : Residential Units :
Electrical License No : 21417
Company : CUSTOM ELECTRICAL
CONTRACTORS
Plumbing License No :18317
Company : Frontier Mechanical, Inc
Mechanical License No : 18317
Company : Frontier Mechanical,
Inc.
Expiration Date : 2/28/03
Approval:
Expiration Date : 6/27/03
Approval:
Expiration Date : 6/27/03
Approval:
(i ) i nis permrt was issuetl m accortlancewith the provisions set forth in yopur application and is subject to the laws o! the State of Coloratlo and to the Zoning
Regulations and Building Code of W heat Ridge, Colorado or any other applicable ordinances of the City.
(2) This permit shall expire if (A) ihe work authorized is not commenced wilhin sixty (60) days from issue tlate or (B) the building authorizetl is suspended or
abandonetl for a period of 120 days.
(3) If this permit expires, a new permit may be acquiretl for a fee of one-half ihe amount normally required, provided no changes have been or will be made in the
original plans and specifcations and any suspension or abandonmenl has not exceeded one (1) year. If changes are made or if suspension or abandonment
exceeds one (7) year, full lees shall be paid for a new permit.
(4) No work of any manner shall be done ihat will change ihe natural Flow of water causing a drainage problem.
(5) Contractor shall noti(y the Building Inspador hventy-four (24) hours in advance (or all inspections and shall receive wntten approval on inspection card before
proceediing with successive phases of the job.
(6) The issuance of~it or the aPProval of drewings and specifcations shall not be construed to be a permit for, nor an aPProval of, any violation of the
provisions of the ild' g co es ny other ordinance, law, rule or regulation.
Chief BUilCIi~ IfSE70CA7f
THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR
CALL: 234-5933 24 HOURS PRIOR TO INSPECTION
DEPARTMEPTT OF PLANNING AND DEVELOPMENT
BUILDING INSPECTION LINE - 303-234-5933
CTTY OF WHEAT RIDGE
7500 R'EST 29'I`H AVENUE
WHEAT RIDGE, CO 80215 - (303-235-2555)
~~UCATION
Building Permit Number: N~0/-
Date:
Properry Owner: r-9'G
PropertyAddress: y(~36
Contractor License No.: S3 ip
soil+~---
/
OWNERUCONTRACTORSIGNATURE OFi1NDERSTANDINGAr7DAGREEMENI' r)
II
I hearby certify tha.t the setback AisWtces proposed by this pemut application are I
accurate, and do not violate applicable ordinances, iulav or regulations of the City
of Wheat Ridge or covenaxrts, easements or iestrictions of recorA; that all
meuuremevds shown, and allegations made ere accurate; that I have read and
agree to abide by all conditioru pruRed on this applications and t6z.t I assume full
tesponsibility foc compliance with the Wheat Ridge Bui(ding Code (U.B.C) and
all other applicable Wheat Ridge Ordinancu, for work underthis pemut.
(OWNERx ONTRACTO,R,/-~ I / ~i4TE 3
~ v~ U pL
l
Phone : ~~'3 - 3/ ~ -O ro
Phone: 3v 3 `j9 ov`~
;tion Value: 7( O`DV
Pernut Fee:
Plan Review Fee: Yes
T Tea Tax'
TOt31:
Description:
v
Electrical License No: 2
~
Plumbing License No: /Q 3l 7
Company:
Mechanical License No:
ompany:~
~.ey
/ g 3i -7
/1/Itckuti~<.`"1
Company:/
d~olirl~
C.
~`r~^r~k✓
~m
Expiration Date: Expiialion Date: Expirarion Date:
Approval: APProval: APProval:
(1) '['his pe[rsu[ was issued in accordance with fha prwisions sel for[h in your applica4on and is sub)ect to the laws of the State of Coloxado anA to tlhe Z"" "g
ReguW4ons and Building CoAe of Wheat Ridge, Colo[ado or any othu applicable ordinancu of lhe City.
(2) This pennit shall exp¢e if (A) the work auehonzed is not commenced within vxty (60) days from issve Aete or (B) Ihe builAin3 avikonzed is suspmdeA or
abandoned for a pedod of 120 days.
(3) If tlus pexmit ezpires, a new pumit may 6e acquired for a fee of one-half the amount no[mal(y' yqui[ed, yr ed m changes have baen oc will be meAe in
the ongmal plms and spa~calions and azry suspeasion or abando~unert has not erzceeded one 1 ear. If ch s tave been ot if suspPnsion or abandomnent
exceeds one (1) year, fiill fees skull be paid foc a new persnit.
(4) No urork of any menne[ shall be done Uhat will clunge fhe ctucal flow of water cauaing a drainage problem.
(5) ConhacW[ shell notify the Huilding Impector lwenty-four (24) hom in aMance foi all inipectioK and shall receive wntten epprovel on'vupec4on cazd before
pioceedingwifhsuccusivephesu ofthejob.
(6) The issuance of a pemut or Uie apyrwal of d[awings md specilicatioins shall not be coKtned to be a pemut foi, not an apprwal of, azryviola¢onofthe
provisioas~lv)taiildirg codu or azry other ordin-ce, law, oule or rogulation.
Chief Buildi Inspector
City of Wheat Riclge, Colorado
Bitild'vig Division ~
Plan Review Correction Notice
Address: 9830 W I-70 Frontage Rd South
O,wvncr: RAC Contractor: Williams Const.
Prujcet: Commercial Alteration Occupancy: B Valaution: $27,000
Dutc: October 2, 2002
1. Provide plumbing, mechanical and~tlectrical contractor information on application.
2. Label tempered glazing on plan Y~
3. Floor plan scale is incorrect. ✓
4. Entrance door to tenant space is to be provided with 54 inches clear between exterior wall and I/
proposed partition to meet accessibility requirements.
Please make these additions or corrections to the submittal and resubmit for review, if you have any
questions please contact me at 303-235-2853.
Thank You
Darin oFA rgan
Codes Admi str or
Arvada Fire Protection District
Division of Fire Prevention
Plan Review Comments
Date:
Z
Reviewed
BY:
Name
Of Project:
:4-
,1 -41._N_ AI
Address: M-• L"'1(`
Occupancy Class: V'') Square Footage \\._1c:'
Sprin{cier System Yes _Y~I_NO Fire Alarm System Yes Y_No
1. Site:
1.--Z The address shall be posted on a temporary basis and
shall be permanently affixed to the building in a
minimum of 4 inch numbers on a contrasting background.
UFC 97 901.4.4. Amended.
2. Exits:
1.--ZExit doors in Group B, F, M, and S Occupancies that are
provided with a key locking device shall be provided
with a sign stating, "THIS DOOR IS TO REMAIN UNLOCKED
DURING BUSiA1ESS HOURS. IF FO{lND LOCKED, CALL THE FIRE
DEPT. Signs are available from the Fire Dept. at No
Charge.
UFC 97 1207.3. Amended.
2, V When exit doors are used in pairs they shall open with
one operation. Edge or surface mounted flush bolts are
prohibited.
UFC 97 1207.3
3. V Remaining exit doors shall be openable from the inside
without the use of icey or special knowledge.
UFC 97 1207.3
4._-ZExit doors shall swing in the direction of exit travel
when serving any hazardous area or serving an occupant
load of more than 50 persons.
UFC 97 1207.2.
5. Exit doors shall be distinguishable from adjacent
construction.
UFC 97 1207.6
7300 Kipling Street • Arvada, Colorado 80005-3876 •(303) 463-7655 • Fax (303) 422-5549
Page Two
3. Corridors:
1. Exit corridors and openings shall be installed in
accordance with the Building Code.
UFC 97 1209.
4. Exit Signs:
1. V Exit signs with battery back-up shall be installed at
required exit doorways and where necessary to clearly
indicate the direction of exit egress where the exit
serves an occupant load of 50 or more.
UFC 97 1212.3.
2. Provide additional exit signs at the following
locations. UFC 97 1212.3
3. ~ Exit signs shown on the plans shall be subject to field
inspection. Additional signs may be required.
UFC 97 1212.3.
5. Emergency Lighting:
1. V provide emergency lighting by night light or battery
pack units for an occupant load of 100 persons or less.
UFC 97 1211.1
2. Provide emergency lighting by battery pack units as the
occupant load exceeds 100 persons.
sIFC 97 1211.1.
/
3. Emergency lighting shall be subject to field inspection.
Additional units may be required.
UFC 97 1211.1.
6. Fire Extinguisher's:
1. ~ Fire extinguisher's shall be a minimum of a 4-A rated,
10-1b ABC dry chemical unit. Contact the Fire Marshal's
Office for number of units and mounting locations.
UFC 97 1002.1. Amended.
7. Fire Protection Systems:
1. Changes to the sprinkler system may be required due to
construction. A minimum of three sets of sprinkler plans
shall be submitted for review and comment prior to work
commencing. UFC 97 1001.5.1.
Page Three
2. Work performed on sprinkler systems shall be from a State
of Colorado licensed sprinkler contractor.
3. A separate permit will be required to be obtained from the
City of Arvada Building Department.
8. Fire Detection and Alarm Systems:
1. Changes to the fire alarm system may be required due to
construction. Submit a minimum of three sets of plans
for review and comment prior to work commencing.
UFC 97 1007.3.1.
2. A separate permit for fire alarm system changes will need
to be obtained from the City of Arvada Building
Department.
9. Electrical:
1._jZThe owner needs to verify that sufficient electrical
receptacles have been provided as extension cords and
multiple adapters are not permitted, nor shall flexible
cords pass through wa11s, ceilings or doorways.
UFC 97 8506.3
2. Electrical disconnects shall be labeled with address and
unit number when installed with multiple units.
UFC 97 8509.3.1. Amended.
3. Provide locks on circuit breakers providing power to
exit signs and night lights as specified in the
Electrical Code.
10. Gas Meters:
1. Gas meters shall be protected when subject to vehicle
damage.
UFC 97 1106.
2. Gas meters shall be identified as to the address and unit
number.
UFC 97 1106 Amended.
11. Interior Finish:
i. V Carpeting shall be a minimum of a Class II Critical
Radiant Flux and documentation shall be provided prior
to installation.
UFC 97 Appendix IV-A.
Page Four
12. Additional Comments:
13. V Any code requirements arising from construction will be
addressed.
14.\xe, These comments shall remain with the approved plans at
the construction site.
15.~ Contact the Fire Marshal's Office at 425-0850 for
questions or additional information.
16. Inspections:
1.__ Z Twenty four hours notice
UFC 97 103.2.2.
is required for all inspections.
Jun 14 00 01:12p Bauen 303-295-3350 p•1
D'7~`7
~
t
, . . , a . . . . . 3M~s:x~~'' , ,•ifl~`.~~"&kseg~?ta h3irP:~°"='C3•;+^YS,. ;+T~9~$n3NFy P- v'+:^i?y1~[:Frur. . w
~
k
,.QEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number : 10576
BUI4DING INSPECTION LINE - 303-234-5933
ClTY OF WHEAT RIDGE Date : 5/25/2000
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215 - (303-235-2855)
Property Owner :
Property Address : 9830 W. I-70 FRONTAGE RD. S.
Contractor License No. : 19342
Phone : 467-4115
Company : Bauen Corporation, The Phone : 297 3311
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certlty that the setback distances proposed by this permit application are awurate,
and do nM violate applicable ordinancea, rules or regulations of the Cily of Wheat Ridge or
covenants, easaments or restrictions of 2cord; that all measurements shown, and allegations
made are accurete; that 1 have rcad and agrea to abide by all condRions printed on this
application, and that I assume fulF responsibili'. r kr wm yance wRh the Wheat Ridge Building
Code (U.B.C.) and all other epplicable Wh dge o(~ances, for work under this permd.
(OWNER)(CONTRACTOR) SIGNED
Construction Value :
$57,640.00
Permit Fee :
$699.75
Plan Review Fee :
$0.00
Use Tax :
$$64.60
Total:
$1,564.35
Use:
~
Description : Instail EDPM roof system over metal roof system using asAanurate insulation in ribs of inetal roof &
covering with 1!2" wood fiber & 3/8" dense deck gypsum
BUILDING DEPARTMENT USE ONLY
SIC : Sq. Ft. :
Approval: ~4N
Zoning
""~4tr ~~~u16
Approval : ~bmi~ d ~ ~a'°Aa~y,
errn~ resu ~ g~Plaa set ln~c~ ~ s~~the
Approval : hOm~~acc~~Yp~~°~a~ n
Occupancy : Walls : Roof : Stories : Residential Un°~+?tion,
Electrical License No : Plumbing License No : Mechanical License No :
Company : Company : Company :
Expiration Date : Expiration Date : Expirdtion Date :
Approval: Approval: Approval:
(1) Thls pamYt was laauetl In actortlance wiU the proviafons set rorth in yoWr applkatlon arW Is wE)ect to the laws W the Stete M Cobrado and to the Zoninq
Regulations and BwidlnCodeW Wheat Ridpe, Cobrado or eny other epplMable ordinances M the City. '
(2) is ae ~~re a(A) ~ rC authorizetl is nol commencetl within aizry (80) days fiom issue tlete or (8) the Duildirp autlwrizetl h suspentletl or
2
(3) If this pertnit expfres, a newpertM may be acquired tor a fee M one-heM the amount nortrialty required, piovided no charipea have been or wi11 be metle in the
originel pians and spadficatlons aiM any auspension or abantlonment has not exceatlad one (1) year. If chanpea are made w N suspension or abantlonment
exeeetla one (1) year, fWl fees shaA be paid for a new permit.
4 No woilc oi a~ry manner shaN be done that wiH change the natural Mow of water cauaing a dminage problem.
5 ConUacror ahaN notiry the BuilAinp Inspector lwenry-rour (24) houra in atlvence tor all (nspectlons antl ahall receive written approval on innpecbon card befae
proceediinp with aucceesive ohaees a me1oo. .
(6) Tha i.~ a e~n tha epproval o tlrewinge aiM apecifications ahall not he oonsWetl to be a peimk for, rror an approval of, arry violation of the pmvieions
oPthabu li Wher ortlinenm, lew, nik or reguletion.
Chief Building I eCtor
DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number :
BUILDING INSPECTION DIVISION - 235-2855
CITY OF WHEAT RIDGE Date :
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215 qppLICATIo N
Praperty Owner: EXIEHIPLa 14Fe~c~6Pg-F,
Property Address : 985c> \,J. 1 --[o ~ ~ 5ct-414 phone : 303 • 4fo7-44I S
Contractor License No. :
Company : 114e_ Phone :
3o3-Zq7•33~1
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certiry that the setback distanees proposed by this permit apvlication are accurete,
and do not violate applicable ordinances, rules or regulations of the City of 1Nheat Ridge or
covenants, easements or restnctions of record; that all measurements shown, and allegations
made are accurate; that I have read and agree to abitle by all contlitions pnnted on this
applica6on, and that I assume full resDOnsibiliry tor compliance wdh the Wheat Ridge Building
Cotle (U.B.C.) antl all other applicable Wheat Ridge ordinances, for work untler this pertnit.
(OWNER)(CONTR4CTOR) SIGNED pqTE
E Construction Value : S7,~qA
Permit Fee : ~ po is
Use Tax : $!dq-`-°
Total : $ t, 5Gell-ss
use:
Description : INgTA1k_ eppM ~p sYSTlar+ ovF~- ~-4E~'pcr ~zcpF ~{5-riEr-~
Li51N(a l~joC.YANl.114M1F-- IN--,-~GN IN R41y5 CF r-(t"-tPrL ~tc~pp ~ Goy~4hi(~
vi" Wcb7 f-13Fc2- { per45•pe4.K- 4~lJ5e.~H
BUILDING DEPARTMENT USE ONLY
Approval:
Zoning :
w -
Approval:
'jub ~W
Approval:
I Occupancy : Walls
51 ' ~ Sq. Ft. :
'l A H
j RECEIVED '
~ MAY 5 ?q~~
7
Roof: Stories:
Electrical License No
Company:
Expiretion Date :
Approval:
riumoing ucense No :
Company :
Mechanical License No
Company :
Expiretion Date :
Approval:
Expiretion Date :
Approval :
(1) Thls pemiit was issuetl in axorpance wiM pro prcYyi" set brN in yopur applintion antl u suOpC b Me lawa o! the Shte of Cobntlo anC ro Ne Zonmp
Regularions antl BuilCirg CoCe ot WNeat RiCga, CobraCO w arry other applinple pymancey pf pie Cny
(2) This pertnit shall apire il (A) the vrork auVronzeE ia rrot eommenceE witnfn yMy (80) Cays hom iswe Cote M(B) the builtling auMOirzetl is suspenEM or
abantloneC for a pMOp o! 120 Eays.
(3) o ninal~lan a a d es• a~p°~~t rtuy b° aryuimd for a fee W onMaN the amount mmuly repuheE. O~ov10eC no Uanges have Deen or will Ee mape in Ne
exceeai o~x t ~°dona an0 amy suapension or abantlonmmt has no[ uceeyep one (1) Year. tt Uanges am ma0e w if wspenalon w abo~onment
year. fuli fees ehall En pak (pr a new pemet
(a) No vrork W any manner ahall Oe tlone Mat will rhanye tlie mtural Ilow of water ausing a tlrainaye proDkm.
(5) Confrdctor anail noUN the Builtlirp Inspepq Mbnry-(our (24) Iqun in atlvance fer all mapeCions anE ahall rxeive writ(en aPPAvaI on inspecbon artl Defom
proteetliing witl+ auuasaiw Dnasea W iM ~ab.
(6) The issuance o( a pertnil ar pN ap0~+l a! tlrawinqs anC specifiopqis shall nol be con3WeC to De a pemtlt /or. nor an aPOroval af. any rola0on 0/ Cw pnviaani
of the builCing mtlp or arry oMer uyinance. law, iyte m rcqula0on. Chief Building Inspector
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
WHEAT RtDGE, CO 80215
Property Owner :
Property Address: 9830 I-70 FRONTAGE RD SO Phone : 431-0232
Contractor License No. : 19678
Company : Signs Plus, Inc/dba Signs West Express Phone : 422 2210
OWNERlCONTRACTOFt SIGMATURE OF UNDERSTANDING AND AGREEMENT
are
(OWNER)(CONTRACTOR)
Description :
Construcdon Value
Pertnk Fee
Plan Review Fee
Use Tax
Total
$2,500.00
$15.00
$0.00
$30.00
$45.00
3 DOUBLE FACE SIGN-TEMP 13 OZ WHITE VtNYI BANNER
AT BOTTOM
BUILDING DEPARTMENT USE ONLY
SIC : Sq. Ft. : 140
Approval : SM 9123197 SIGN SLEEVE MAY NOT BE PERMANENT
Zoning : G1
Approval:
Approval;
Occupancy : Walls
Roof : Stories : Residential Units :
Electrical License No : IqWgs Plumbing License No : Mechanipl License No :
Company : b~&ypexii- ~w- Company : Company :
Expiration Date : Expiretfon Date : Expiration Date :
Approval : Approval : ApProval :
rnis pem,rt was uauea In .awdance wan mB awiewns ee~ roM m yopur eaWwaftn ara uwba ro n,e iews a ma sm~e a caw~ao and ro mo zomny
neouusa,c aoa suaaq~coas awne.~~e, ca«aao or am omer eaWwwe ownaces a c+ty.
(2) This pemiit ahep wphe R(A the vrork a ia ~rot comme~ed wNhin eixly (80) tleys hom Isaue date or (B) the buBGrip eWwrized is auapenEad ar
aDantlwiod fot e pefbtl M 1 davs.
(3) It tMS Partnn eXWn4, a newpamdt mey be aawrea ror a fee m ono-nan me amoum nameW roaukea, provIdea no rnenoes nwe oaen a wn be meda in are
origin~ Wans e~M sPecHksGOnaand any a,uapansion a a0endonmeM has not exceetletl aw (1) Year. N YwnBes ere mada a M susPensbn w abandonmeM
exceeCa orro (7)Y~r. WN feesshaN be W~dpe~d for e new PertNL
(4) No work ot enry manner shaN 6a done.thaf will cMnpa the neWial lbw of watar cauaing a drahrega W~em
(5) Con6aetor aMN notlry the BulhWq Insoeclor M~onyfour (24) taurs in adverroo tor, all inspectlau and sheN rcahre wriftn approval on (nspeefion cartl before
pro~aAI Gq wIM auccesaive ptiasea ot the1ob
(6) The Iswamx of a pertmt a lhe epprova~~or drawIrps and aaedfirations enen 1rot be consmod ro be a peimn ror, rwr en approval m, airy waation w me provislons
of " bu din7 cades or azry adinance, law, mle a rc9uiallon. .
mcea proposea by thia. pertnit application rre
wea, rubs w regulatlons of the City of Wheat
sof reeoM; that all rrroasuremeMS shown, ani
and aCres M abWe by all condifions printed o
THIS PERMIT VALID QNLY WHEN SIGNED BY THE CHIEP BUILDINt3 lNSPECTOR AIJD MAYOR
CALL: 234-5833 24 HOURS PRIOR TO INSPECTION
DFPARTMENT OF PLANNING AND DEVELOPMENT
BUILDING INSPECTION DIVISION - 235-2855
CITY OF WHEAT RIDGE
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215
Property Owner :
Property Address :
Contractor License No. :
Company
.Z" 7v
sle.vs
Building Permit Number :
Date :
j~ FAC:7f1 S~s~t~i G-ES
Phone:
Phone :
OWNERlCONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT ~
Construction Vaiue P
I hereby certily that the setback distances proposed by this pertnit applieation are accurate, P0ftT111 F08 :
and do not violate applicable ordinances, rules or regulations of the City of Wheat Ridge or
covenancs, easements or resirictions of record; that all measurements shown, and allegations PIBn Revl@w Fe2 :
made are acwrate; that I have read and agree to abide by all wnditions printed on this application, and that I assume full responsibility for compliance with the Wheat Ridge Building Use Tax :
Code (U.B.CJ and all olher appliwble, eat id ordina ces, for ork under this pertni(.
(OWNER)(CONTRACTOR) SIGNED Total : S'L&~-~ _ a ~ Fy 4 ZaC/'S~ /✓~lt~ l f" C7 /
Description
/3 02. (.(//f1T~
BUILDING DEPARTMENT USE ONLY
Approval : AyK
Zoning : C t
Approval:
PUtili ~M -1
Approval :
Occupancy : Walls
SIC :
of Lic- riwnnww.nm~
-A•• ex- k.u..-
Sq. Ft. : 1404
Roof : Stories : Residential Units :
Electrical License No : Plumbing License No : Mechanical License No :
Company : Company : Company :
Expiration Date : Expiration Date : Expiration Date :
Approval: Approval: Approval:
10 lGP1~fi3~ROSMf88tl~f 11 BP.131T8!RS9~(CBtl~ 0 [WEfsSR§qU1m1w
(1) tTis pertnit was luued in aaortlance with the pmdsioas set farth in yopur applinUOn and Is suqect lo the Wwa o1 the SGte of ColooEO and to the Zoning
Requlations aM BuilCing Code ol Wheat RiEye, Colorado w any other applicable orUinaMes ol the Ciry.
(2) This permil shall expiro B(A) Ne work authonzed u not cammenced within sixty (60) tlays Irom issue date or (8) the W il0ing auNOrized is suspended ar
a W nEOMA lor a perioE ol 120 Cays.
p) II tnis pertnit e:0ires, a new permil may Oe acpuired lor a lee of one-hall the artaunl nomwlly required, OmvideE na Uanges have Eeen or vnll be maEe in the
on9inal Olans and specifwlions and any suspension ar aOanEOnment Iwi nol ezuMed one (1) year. If changes are made w if suspension or aDandonment
e:ceeds one (t) year, lull fces snall De paitl for a new permil.
(a) No wod of any manner shail Ue Cone lnal win change tne naWral Ilow ol waler wusing a Crainage pro0lem.
(5) Contractor shan notify the Builtlinq Insp~ tor twenry-lour (24) hours in aOvarKe lor all inspectbns anE shall receive wntlen approval on inspetlion wN belore
praeediinq with su¢essive phazes of t~e'oC.
(b) TTe issuance of a pcrmil ar the ap0mval o~Orawings anE spetiRwtians snall nol bc construed lo De a pertnil lor, nor an approval d, a(ry viNaGon ol the provisions
of t~e Gud0lnq Codes or any oUer oNinance, law, rule ot regulallon.
Chief Building Inspector For Mayor
TF11S PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR
CALL: 234-5933 24 HOURS PRIOR 1'O INSPECTION
w ~
e ~
N `1
„ . . . .
~
0
z
a ~
m it,
~ _
o ~
o ~ a
s~
Z
~ ■
re ~
<
A
m ~
N
V O
~
~
~
r
s~
sQ~ .
~--C
70
ITLil
3:11
1M
04
f ■
A
~
~
FUI
~
\
1
%4
_
_
v~
Z8'd SN9I5 67lf11N33 61060t2 S 85180 161Li168
~
DEPARTMENT OF COMMUNITY DEVELAPMENT
7500 wEST 29tn AvENUE BUILDING INSPECTION DIVISION
237-6944 ExT. 255 P.O. eox sse CITY OF WHEAT RIDGE, COLO.
PERMIT N0.
eYJ 'lJ~ ~
THIS PERMIT VALIO ONLY WHEN SIGNED BY THE CHIEF BUILDIN6 INSPECTOR AND RECEIPTED BEL7W.
APPL.iC 7ipF1 FOR MISC
30"B -~7D L~ ~
JOB ADDRESS
LANEOUS P]ERMI
WNER
/
CONTRACTOR ( I7 i
ADDRESS
Zf),- JD
~ Kd X7-
ADDRESS
PHONE ~ -
Z
ZIPCODE ROp:?6
GTV ZIP CODE
PHONE LICENSE NO. I
`%ONTRACT PRICE $ )
zy7/J ^
1. TVPE GrouAP , Wollgl Proieclina❑ O1Mr
SaDFeera
2. MATERIAL ~ Totol Squan Fad G D
SIGNS
P rmit No.
ILLUMINATION Yes~ NoW Typemiki ~ Elftt
3
_
.
.
4 SET BACK FROM PROPERTY LINE N_A'"' 5_ E_ W Zoi
(SOetity whith is }ront ) I)(J ❑ ❑ ❑
Apprwod,ZOne Inspector
DisoDMovsd
;~A
1. TYPE Solido Mon Thon 80% ODSnO Lou TAan 80% Open
MATERIAL HNpAt
3
FENCES
.
3 SET BACK FROM PROPERTY LINE N_ S_ E_ W Zone_
(Specity whieh if }ront) ❑ ❑ ❑ ❑
ApprwW,Zom Inmpeetw
DieaDMOVed
I
.
2
OTHER
3.
DRAW SKETCH OR SHOW BELOW, THE FENCE,SIGN,OR OTHER STRUCTURE, GIVII`n DISTANCES FROM PROPERTV LINES.
(SET84CKS OR GROJECTIONS INCIUDED)
SPECIFY NORTH
LRf1NT
STREETNAME-~'7D
SHOW DISTANCES FROM THE M41N BUILDING TUADJOINING NOUSES, STREETS, AND PROPERTY LINESiON IRREGULAR LATS, SHOW LEAST
DISTANCE TO PROPERTY LINES, NOT MAXIMUM OR qVERAGE DISTANCE.
CPf't_PCATiON FOR PLUMBfiVG; ELECTRICAL;MECNANICAL PERMIT
THIS APPLICATION WILL BECOME A PERMIT TO PERFORM THE INDICATED WORN ONLY UPON VALIDATION BY THE BUILDING INSPECTION DIVISION.
PERMIT WIL! EXP9RE 60 DAWS FROM DATE OF ISSUANCE !F WORK IS NOT STARTED WITHM THAT TIME.
ELECTRICAL PERMIT
STATE UCENSE N0.
-°:ilJ"wl?~~.IA;:•dVIRE.U`v°DERSREOfI_L'eGAi
PLUMBING PERMIT
STATE LICENSE N0.
FLOOR BSM IST 2N0 3RD 4TH
MECHANICAL PERMIT
N0. FLE4CirtbOtwGoi011PFOpans ElaeSdor
~,~p,
WATER CIDSET
FORCED AIR - BTU
TEMPORARY METER
WASH BOWL
HOT WATER - BTU
NEW SERVICE AMPS
BATH TUB
STEAM - BTU
CHANGE SERVICE-AMPS
SHOWER
AIR CONDITIONIN6-BTU
LIGHTING
SINK
OTHER
HEATING
GARBAGE DISP
REFFIGERATION SYSTEM
POWER SUB-CIFCUITS
WATER HEATER
Refri aronl Group
UTILITY(RANGE,DISPOSER,ETC.)
AUtO. WASHER
Po+nds Char e
FIXTURES
DISH WASHER
AUTOMATIC SPRINKLER SYSTEM
WIRING MOTORS B CONTROLS
F100R DRAIN
ELEVATOR
$IGNS
URINAL
TRANSFORMERS 9 RECTFIERS
SEWERS
ADDITION TO OLD WORK
OTHER
MOTORS OVER 1 HP
TOTAL FI%TURES
i i . . _
REMARKS
e tAot this applico-
wl
d
k
b
PERMIT FEE
p
no
e
y uc
I here
tion ia correct and undsrstand thot I
li-
til thi
USE TAX
s opv
eonnol start this project un
cotion it apOroved. I sholl tomply with
TOTAL FEE
ihe lowf of the Stote oT Colorodo and fo
fhe 2oninp Requlutiona and Buildinq
AppROVEI
An
i Rid
h
915RPPROVEf
y
pe.
ea
Code of the City af W
violation of the obova terme wi11 couse
CHIEF BUILD
i
immadiote revocotion of this vermit
.
i..._ i
7 V
$
~
AUD UNlE55 RECEIMED
K,T07S
X sa ?I
0 6 3a
INSPECTOR,City of Wheat Ridqe
.Dote Issued -7 7/ ~z
CALL 237-8944 EXT. 255
24 HOURS IN ADVANCE
FORINSPECTIONS
7500 WEST 29th AvENUE DEPARTMENT OF COMMUNITY DEVELOPMENT
BUILDING INSPECTION DIVISION PERMIT NO.'~
237-6944 EXT. 255 P.O. Box Bse CITY OF WHEAT RIDGE, COLO.
THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF UILDING INSPECTOR AND RECEIPTED BEL'JW.
3`}
JOB ADDRESS ION FOR,/v11SELLANEOUS P~Rty11T g /
rtd- OWNER
CONTRACTOR / I (L C~ ADDRESS
ADORESS,~ZA 7! PHONE
CITY pZIP CODE U CONTRACT PRICF g 00 , ZIP CODE
PHONE C.1~2 LICENSE NO. 3
1. TYPE GroundU Wall❑ Proisctinp❑ Othsr SaDFoee
2. MATERIAL
SIGNS 7otal Squon FNt
3. ILLUMINATION Yea❑ No❑ Typa Elxl, pennif No.
4 SET BACK FROM PROPERTY LINE N__ 5__ E__ W=
(SDeCify which ia front) ❑ ❑ ❑ 3 I. TYPE SolidU Mon TMn BO% OpenO Lns TI
0 MAT
FENCES
ERIAL
3. SET BACK FROM pRppERTY LINE
(Spstify whioh is }ront)
I.
OTHER 2
13.
INSPECTION TICKET
H_ 5_ E_ W JOB
ADDRESS ~9.3 Q
~
. DATE: BLDG. PERMITN V9.FC'
DRAW SKETCH OR SHOW BELOW,THE FENCE,SIGN,OR OTHERSTRUCTURE,GM
(SETBACK$ OR PROJECTpNS INCLUDEA)
PERMITM
BLDG. CONTR. k,
SUBCONTRACTOR
STREET
DATE INSP. REQ. S 0
TYPE OF INSP.
INSPECTION MADE
REMARKS 9'6-$4 96-4:LYL-
r3'1G--f(iY rUl cfg 171J Lc/q8 03
SHOW DISTANCES FROM TIiE MAtN BUILDING TUADJOINING HOUSES, STREETS, AN
DISTANCE TO PROPERTV LINES, NOT MA%IMUM OR AVERAGE DISTANCE. W.R. FORM 619
APPLICATIpN F0R PLUMBING; ELECTRICAL
THIS APPLICATION WILL BECOME A PERMIT TO PERFORM THE INDICATED WORK f
3'ERPAI7 W11L E%PIRE 60 DAYS FROM DA'fE OF ISSUANCE !F WC
U
ELECTRICAL PERMIT
STATE LICENSE N0.
PLUMBING PERM{. me~nArvIc;qL PtHMIT
STATE LICENSE N0.
AJafn?hJEnAWIREUWDF.S3SlZ.E311_LEGAL
NO.
FLOOR
WATER ClASE7
BSM
IST
2ND
3RD
4TH
NQ
FUEI<CkcNQ»qlPlopuw EI Sola
FORCED AIR BTU
TEMPORARY METER
WASH BOWL
HOT WATER - BTU
NEW SERVICE AMPS
BATH TUB
STEAM - BTU
CHANGE SERVICE-AMPS
$HpWER
AIR CONDITIONING-8TU
LIGHTING
SINK
OTHER
HEATING
GARBAGE DISF
REFRIGERATION SVSTEM
POWER SUB-CIFCUITS
UTILITY(RANGE,DISPOSER,E7C.)
WATER HEATER
AUTO. WASHER
Ratri eront Goup
PounAt CMr s
FIXTURES
DISH WASHER
AUTOMATIC SPRINKLER SYSTEM
WIRING MOTOFtS d LONTROLS
FIDOR DRAIN
ELEVATOR
SIGNS
URINAL
TRANSFORMERS 9 RECTFIERS
SEWERS
ADDITION TO OLD WORK
OTHER
MOTORS OVER I HP
TOTAL FI7(TURES
I hsreby ocknowledqe that this applico-
fion u torrect and undenfand thot I
eonnof ifart this projsct until this appli-
Cation ie approved. I shall comply with
ehe lowa of Ihe Stote of Colorado and to
ihs ZoninQ Requlations ond Buildinq
Code ofine City oi Wneat RieQe. Any
violation ot the obove terms will couse
'mmediote revoeation_of this permil.
Beenb 9i0na1me
PERMIT FEE
USE TAX ~ 3s 6d
TOTAL FEE / 9 , 6 d
CHIEF BUILDING If4SPECTOR,City of Wheat Ridqe
Dafe Issued/
OT VALID UNLESS RECEIPTE
I'llifumilln
~ iiiL- 8S'~F
CALL 237-8944 EXT. 255
24 HOURS IN ADVANCE
FORINSPECTIONS
oEnrrtNUrsEn
M911/17329
E
r
r
S
B
I
O
~
~
m
a
a~o
~
0
0
0
9 s
m
0 a
9
~
o
m
~ ~
~ a
s
~D
~ O
L~ Z
N
M
~
'
e m'
c
a
ro
co
m m
W
N
0~
N
m
o
r
gm
£
~
~
~
a ~
B
H
7d
3
P
~
7
~
y
.
~
m
I~-+
~
O'
3 '
o
m
M
O
R
F+
w
m
~
~ m
F+
00
P.
O
N
(D
O
O
rt
.7
~ fP
w
°
w
~
a
w
H
y n
q
cn
rt
o
p
F
•
w
a
O
a
~
N
c
N
v
n
~
o
m
00
w
w
~
N
O
O
~
m
~
N
n
I
m
v
o
~
F
'i
O
rt
w
ID
[
.~~.m 3
m
Gp~ ~
moco
m m ~ m
M mmm
p_ <
3 a~m
~m-
~ o y ~
S~S»
~NmS
a o3 m
~ » c
y~a
m a So
4
p 0 a ~
~m0»
n°oa
mm,
n2O
mn-
mmm
ngm
m 69
mQ'o
m
°o
9 m
n
m~5
m
m p Q
03=
n
mfo
0Jj
~
O me
O
~
~
f
0
»
T
0
~ n
»v55~~~
~ ~ T
m '
=
('1~
0
0
m m 1
o°
° O
~ m
m°
O
h
~
\ l
~
H
~
^H
yM
L J
loli
0
C:
a
z
~
DEPARTMENT OF COMMUNITY DEVELOPMENT M91~/17329
7500 WEST 29tn AVENUE BUILDING INSPECTION DIVISION PERMIT N0.
237-6944 Ex7. 255 P.O. eOX 638 CITY OF WHEAT RIDGE, COLO.
THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR ANC RECEIPTED BEl9W.
JOB ADDRESS
PERMIT FEE
usE Tax
TOTAL FEE
APPROVED
CONTRACTOR T--maovS ADDRESS 9IT30 (J. <'>O St'" .C, WD.
ADDRES~ (-'-~T PHONE S~1U-11102 ZIPCODE 'OORj
CITY ZIP CODE CONTRACT PRICE $
PHONE LICENSE NO. LL~1LL_ DATE
1. TYPE Ground ❑ Woll❑ Proiecfin0❑ Other S a D Feee
2. MATERIAL Totnl Spuon Fset
SiGNS 3. ILLUMINATION Ye+❑ No❑ TyDe EIKf Permif No.
4 SET BACK FROM PROPERTV LINE N_ 5_ E- W Zone_ Apprwed,2one lnspeefor
(Specily whicn ie front ) ❑ ❑ ❑ ❑ Di3aDDroved
1. TYPE Solido Mon 7hon BO% ODen❑ Len Then 80% Opm
FENCES MATERIAL
3. SET BACK FROM PROPERTY LINE
(SOecify whitA b ironf)
1. ~i7tl/.'id1L - jUOJJ'2
OTHER 2, ~rcdim.t,e.c. 010,41f
3. 0/' r,
_ HeipM
N_ S_ E_ W zan•_ nvp.w.e,zon• io.v.c+a
❑ ❑ ❑ ❑ DiaapDrovad
DRAW SKETCH OR SHOW BELOW, THE FENCE,SIGN,OR OTHER STRUCTURE,GIVII:v DI5T4NCES FROM PROPERTY LINES.
(SETBACNS OR PROJECTIONS INCI.UDED)
i ~
J
Y
F
2
SPECIFY NORTM
8
In,
FOR
STREET NAME
SNOW DISTANCES FROM THE M41N BUILDING TQADJOINING MOUSES, STREETS, AND VROPERTY lINES; ON IRREGULAR LATS, SHOW LEAST
DISTANCE TO PROPERTY IINES,NOT MAXIMUM OR GVERAGE DISTANCE.
APPLICATION FOR PLUMBING; ELECTRICAL; MECHANICAL PERMIT
THIS APPLICATION WILL BECOME A PERMIT TO PERFORM THE INDICATED WORK ONLV UPON VAIIDATION BY THE BUILDING INSPECTION DIVISION.
PERMIT WILL EXPIFE 180 DAYS FROM THE DATE OF ISSUANCE IF WORK IS NOT STARTED WITHIN THAT TIME.
ELECTRICAL PERMIT
STATE LICENSE N0.
PLUMBING PERMIT
STATE LICENSE N0.
MECHANICAL PERMIT
ALUMINUMWIREUNDERSfZE81lLEGAI
FLOOR
BSM
IST
2ND
3RD
4TH
N0.
Fl1El;CircleQ4fwsdlPtoporr EIeeSolar
Np,
WATER CLASET
FORCED AIR - BTU
TEMPORARY METER
WASH BOWL
HOT WATER - BTU
NEW SERVICE - CMPS
BATH TUB
STEAM - BTU
CHANGE SERVICE-AMPS
SHOWER
AIR CONOITIONING-BTU
IIGNTING
SINK
OTHER
HEATING
GARBAfiE DISP
REFRIGERATION SYSTEM
POWER SU6-GFCUITS
WATER HEATER
Refri eiont Grap
UTILITY(RANGE,DISPOSER,ETC.)
AU?O.WASHER
Pounds CMr e
FI%TURES
DISH WASHER
AUTOMATIC SPRINKLER SYSTEM
WIRIN6 MOTORS 9 CONTROLS
FI.IXJR DRAIN
ELEVATOR
$ICaNS
URINAL
TRANSFORMERS 8 RECTFIERS
SEWERS
ADDITION TO OLD WORN
OTHER
MOTORS OVER I HP
TOTAL FI%TURES
I Mreby ocknowledqe that this apDlico-
tion it eorrect and understand thai I
tonnof Hart this projtlct until tt+is oppli-
tation is opOroved. I shall comply witA
the lowf oi the Slote oi Colorado ond ro
ths ZoninQ Repulationn ond Buildinq
Code ofthe City o! Wheaf Ridqe. Any
viololion of the above terme will couse
immediote revocafion of tnie permit
oe'ea s~c~aw,.
CHIEF BUILDIr
OWNER
~ NOT VAIiD UNLE55
yp W
~~38`>-1
/
d-
City of Wheat Ridqe
Date Issued
CALL 237-8944 EXT. 255
24 HOURS IN ADVANCE
FORINSPECTIONS
INSPECTIONS WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE BUILDING SITE
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
WHEAT RIDGE, COLORADO
7500 WEST 29th AVENUE
(303) 235-2855
INSPECTION RECORD
S-~ ar-.Pc C: -I', k_ Ac.-N i; , i ~ I.t~ 1 r~ ; ~ ; ~ •qf"', pti^!~ ~ zr~ -
JOB ADDRESS
BUILDING PERMIT NO. Mqi# 1739e DATEISSUED 9/4/91 rvPe occuanNCr
OWNER Lutheran Physical Rehab.
CONTRACTOR D. L. Timmons Company, 635 Canosa Ct. Denver, CO 80204 628-0852
SETBACKS FROM PROPERTY LINES: NORTH SOUTH EAST
West
INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB
INSPECTION
DATE
(NSPECTOR
Foundations
Footin s
Caissons
Reinforcin or Monolithic
Weather roofin
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED
Concrete Slab Floor:
Electrical Ground Work
Plumbin Ground Work
Heatin Ground Work
DO NOT POUR FL0PP UNTIL ABOVE HAS BEEN SIGNED
Rou h Electrical WP~ -
Rou h Plumbin
Air Test Gas Pi in
Rou h Heatin 8 Ventilation
labove must be sioned nrior to fiamina insnection)
Framin -1 -q~
d 1
Insulation
~
Dr wall nailin
Roofin
Refri eration
Electrical under round
Final
Electrical Fixtures
z
Plumbin Fixtures
Heatin & Ventilation
Q
Landsca e 8 Parkin
R.O.W. 8 Draina e
Fire De artment
Job Com leted
. /
UCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF
OCCUPANCY IS ISSUED
PROTECT THIS CARD FROM THE WEATHER
' - ri
t
INSPECTION TICKET
JOB
ADDRESS
DATE: BLDG. PERMIT#
BLDG. CONTR.
PERMIT#
SUBCONTRACTOR
DATE INSP. REQ. - 12-
TYPE OF INSR
INSPECTION MADE
REMARKS
W w
1
INSPECTION TICKET
JOB ADDRESS ~q ao ~
DATE: ~ ( 2- BLDG. PERMIT#
PERMIT# m 1t 1 L~
BLDG. CONTR.
SUBCONTRACTOR
DATE INSP. REQ. C~h
TYPE OF INSP.
INSPECTION MADE
REMAFKS
-
W.R. FORM 619
J
3,;~ 9
INSPECTION TICKET
td
JOB ADDRESS ~ '
471C) ~ ~
DATE: /O .3 BLDG. PERMIT# / 3Z
PERMIT#
BLDG. CONTR. rli ""~m'on'S
SUBCONTRACTOR
DATE INSP. REQ.
TYPE OF INSP. 4nal in s ~ INSPECTION MADE
REMARKS 190(t( DuS~
J~4o/a o Cvc~-~-
cwg/-w /rc,/
W.R. FORM 679
rva P h~ 501c.- U. a-s .i a.-s1n llcl
~
7500 WEST 29tn AVENUE
237-6944 EXT. 255 P.O. BOX 638
THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHfEF BUILDING INSPECTOR FND RECEIPTED BELOW.
APPUCATION FOR MISCELLANEOUS PERMII~~~~~~-~-/~~
JOBADDRESS 9830 I-70 Frontage Road _ OWNEF ~ _.4 G e__
CONTRACTOR Laser Electric, Inc. ADDRESS 7 J
C~1 U " ' ZIP CODE ~''C.'>
ADDRESS 2460 W. 26th Avenue, Suite 30-C PHONE %.~5
CITY Denver, CO ZIP CODE $0211 CONTRACT RICE $c -
455-4753 LICENSE NO. ~L46 DATE
PHONE
1. TVPE GrounE❑ Woll❑ Proiectinp❑ Other SaDFOee
2. MATERIAL Tofol Squan FeN
Ya❑ No❑ Type Eleef. Wrmit No.
3. ILLUMINATION
Zons._ AOMa~d.2on~ Inap~eta
4. SET BACK FROM PROPERTY LME N__ S Q E~ W❑ p~~Q~p,~d
fCn.nilv w11icA is tront) ❑ _ - .
I. TYPF
DEPARTMENT OF GOMMUNITY DEVELOPMENT pERMIT NO
BUILDWG INSPECTION DIVISION ME91(k4816
CITY OF WHEAT RIDGE, COLO.
_ • ' LI
FEh
INSPECTION TICKET
V
- INSPECTION TICKET
E_
a Joa y~ c(<.~7~ ) o ~ri ~
/ADDRESS
JOB /1 !~'/i-~-~G -
ADDRESS
OTF ~ Iroi E`~ r
yJ~ 9~✓f j-/0 BLDG. PERMITN
DATE:
~ ~ BLDG. PERMIT# ~11~= CTURI
~ DATE: pERMITM
PERMITB
-
BLDG. CONTR. ~
SUBCONTRACTOR
Y
DATE INSP. REQ.
~
/'~✓-4
TYPE OF INSP.
~
INSPECTION MADE -
2
/
REMARKS
sw
C
~
1 W.R. FOPM 6-19
~
57A
JMINUM WIRE UIJDER SIZE 8 ILLEG
TEMPORARY METER _
NEW SERVICE - AMPS
CHANGE SERVICE -AMPS _
LIGHTING
HEATING
pOWER SUB-CIFCUITS
iiTUirvfaANGE.DISPOSER,E
BO'NL
WIRING MOTOFtS Bi CONTROLS I FLOOR DRAIN
SEWERS
TO
Y LIN!
BLDG. CONTR.
SUBCONTRACTOR
DATE INSP. REQ.
TYPE OF INSP. ---Y-
INSPECTION MADE
Y LINI REMARKS (:57
fREE
pNCE Ui&,_
CTF W.R. FORM 619
ED W
ISSUF J ~
G PI
HOT
L~
I Mreby acknowledpe thot Mis oVGI'c°'
tion is correct ond understand tnat I
oannot ftart tAis Droject until thn oppli-
Cation is oDVroved. I shall comply wifA
the Iowf oi Ihe Sta1e ol Colorado ond fo
ths Zoninq Requlationa ond Buildinp
Code of the Uty of Wneat Ridpe. AnY
viololion ol the obova terms wdl cause
immediate revocotion of tnls permH
i~ -
"~'l'~✓ / "/~//,'C t~if/d/~/'~
)FOOBeeM' 9iona ur•
✓
PERMIT FEE
USE TAX
TOTAL FEE
APPROVED
96*101"Ro7m.
CHIEF BUILDI~
.or
NOT VA110 UNLE55 RE
e- 0- 5 Sai
J~o - C(d
$ 4'-5-9 r
City of Wheat Ridqe
CAL1237-8944 EXT.255
24 HOURS IN ADVANCE
FORINSPECTIONS
Date IssuPd~/
7500 WEST 29th AVENUE
237-6944 EXT. 255 P.O. BOX 638
nNlv WHEN
DEPARTMENT OF GOMMUNITY DEVELOPMENT
BUILDING INSPECTION DIVISION
CITY OF WHEAT RIDGE, COLO.
gY THE CHi
AND RELEIPTED_BELOW.
~
qn ~E? j/,f J~/~~ tJ•c F('~ ` .IOWNER i - -
JOB ADDRESS
CONTRACTOP
^ ' n / S~c ~ PHONE a •~L/~0~ ZIP CODE ~
ADDRESS g ~`~L
C~a2/~- CONTRACT PRICE $
CITY n < vv' ZIP CODE
~ y ~ DATE
PHONE LICENSE NO.
Wo~l❑ Proieelinp❑ Oth~r SaDFeeO
I. TYPE GrounO ❑ -
2. MATERIAL ~S
SIGNS 3. ILLUMINATION Y~lf-i N0o TYp°~
4. SET BACK FROM PROPERTY LINE N_- 5 E a W. INSPECTION TICKET
(Spxity whict+ie front) o ~ JOB
I. 7YPE SolidEl Mon Tnan 80% OvsnO la■s I ADDRESS
~ MATERIAL
FENCES 3 SET BACK FROM PROPERTY LINE N--- S- E--'- W
(Spscity whith is }ront) o E3 13
DATE: BLDG. PERMITN
I.
OTHER Z
3.
PERMIT#
BLDG. CONTR -~~4 ~
DRAW SKETCH OR SHOW 8E„OC,~fE~DEO) FENCE,SIGN,OR OTHER STRUCTURE, ci'
(SETBACKS OR PROJ"' SUBCONTRACTOR
DATE INSP. REQ
PERMIT N0. MM911k3764
7 3 3
TYPE OF INSP.~
INSPECTION MADE 2
REMARKS
~
STREET NAME
SHDS AINCE N TO SPROPERTY UNESBN0TD1MAX MUMJOR IAVERGE EDISTANCE
~
W.R.FORM &19
V
APPLICATION FOR PLUMBING; ELECTR
THIS APPLICATION EWILL RMIBT WI~LMEx PRE MBO DAYS FROM THE DATE OF SSUANCE IF WORK IS NOT STAPT, ~
ELECTRICAL pERM1T PLUMBING PERMIT
STATE LICENSE NO
STATE LICENSE N0. u0 FUE
TEMPORARY
WASH
DISH WASMER
9 CONTROlS FI.D(K+ DRP.IN
TRANSFORMERS 9 RECTFIERS
JCYVGw
ADOITION TO OLD WORK
OTMEH
TOiqL FIXTUR
MOTORS OVER I HP
,
~
4 K
-
~.,r •,~V ~K! i/`
.
T ,L,y //y~ " Y
!
,r~ ucr
-
REMARKS-~
~
r 0
,;✓~..~/Or ~
Yd'
~~jlu~~ U/
4C
~ S
'
~
PERMIT FEE
I Mreby acknowledqe tho~ t~is apD11C0'
t and understand ihai I
USE TAx
✓
~
tion n correc
connof starl fAie prOltlct untii Ihie oDD~~'
it~
l
TOTAL FEE
f o' VG
y w
wtion if oDGroved. I shall comp
the lowe of Ihe S1o1e of Colo~odo a~d 10
larions and Bwidin0
APPROVED
the ZoninQ Repu
. Q~Y
Code of t~e City of Wl+aof Ridqe
e
DISAPPROVED
CHIEF BUILDING
PECTOR, Cityof Wheat Ri qe
violotion ol tne above rorme wd~ caus
immediate revotation of t~is permil
~ ~
Date Issued
~OOliean Sipn r~
IN THAT TIME: ~ ~
MECHANICAL PERMIT
,C'vtMOnslGoflaQRWo^i
M RCED AIR - BTU
? WATER BTU
awu _ BTU
ALID UN
Ft q u07 S'
~'j-/~;-`r/1
CALL 237-8944 EXT. 255
24 HOURS IN ADVANCE
FORINSPECTIONS
O
N
(D
0
0
.V
7
N
a
m
0
0
,
❑ ❑ ❑
L
Z 03 ~
O' ~
o ~
'
1
D
_
m
a
m a
, m
p
~ ~
<
~
~
N
N ~
N N
m
~
~ O
N
C
~
❑ U
7
~
N
'a
fD
co ❑
0
v
o
~
7
'
~ N (D
N
~
n
Q~
3
m
❑
t
(D
'a
❑
a
~ ncn
'D
I
C
o'
0
C
>
O
N
~
~
N
❑
~
,
CD
o
0
:
;
v
n
0
0 F
O ~
oa C
X
--•~w n Z
rn 0 ~
~ 3
~ ((j) 10cn m
O~
Z ~a (D p
Z
O~o-°•m
I ~=.y;~
n ~ O p
m 'm
v
~
Property Owner :
Property Address : 9830 W I-70 Frontage Road Phone : 813-5415
Contractor License No. : 19973
Company : Century Signs, Inc. Phone : 741-4710
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certity Mat the setbadc distancss proposed by this parmk applicatlon are aaurate,
and do not vwlata applMable ordinances, ruks a regulatans of the City oT Wheet Ridge or
covenants, easements or restridions of record; that aN measuremanta ahown, and sllegations
made are accuraEe; that 1have road and agree to abide by all cond8ions priMed on this application, and that I i~ssume fWl reaponaibilily for compiiance wkh Ne Wheat Ridge BuiWhg
Code (U.B.CJ and all other applicabb Wheet Ridge ordinancea, for work under this permR.
(OWNER)(CONTRACTOR) SIGNED DATE
Use:
Description : Fabricate & install replacement signs for 7' x 20' pylon sign, & panchannel letters for bldg.
Approval : SM
Zoning : C-1
Approval:
Approval :
Occupancy : Walls
BUILDING DEPARTMENT USE ONLY
SIC : Sq. Ft. :
freestanding sign will use exisdng poles, wali sign complies with sq.
ft.
Roof : Stories : Residential Units :
Eleetrical License No :
Company :
Expiration Date :
Approval :
Plumbing License No :
Company :
Mechanical License No :
Compaoy :
Expiration Date :
Approval :
ConstrucHOn Value
Permit Fee
Plan Review Fee
Use Tax
Total
$15,700.00
$30.00
$0.00
$236.00
$266.00
Expiration Date :
Approvai :
(1) This pemYt wae lenuetl In accordance wIN the provisiwns set WM In yapur epplketlon and is wbied to the lawa of the Smte of Cobrstlo entl ~ the Zrninp
Regulatlona erq ButlNfq Cotls of Wheet~ Ritlg ~coloiado w anr oNer eppliceble atlinancea athe Cily. (2) This pemtlt Bhaq ezplrc H(A Mre wMk e tl~oriz la not commenceC withm elzty (80) Gaya hom iseue tlate or (B) the buiWirq autliaizetl Is suspentled w
ebandoMd tot e pBAOd Of dsya.
(3) If ihispermlt expires, a new Dertn~l meY be ac9uiredfor a he W one-heH the amount normaly reQUire4 oroviaetl no charpes heve been w w~71 be maCe In the
ongmal pians an0 epedficefwns arM anry suapension ar abantlonmeM hae rat exceeded one (1) year. 1t Menges aro made a tt suspenabn a abantlonmeM
exteeEB One (1) Year. fWl few ehNi Ds PeW for e new PertnH.
(4) No work d arry mannu alietl be Cma Matwid chanpe the rretuial Ibw Mwater caus" a drainage proDkm.
(5) ConUactor shell notltytlre BWWinp In r tweMy-Mur (24) hours in advanee fa all mapeetlaia eiW ahell recelve wriGen appmval on Nspeetion mrd before
tohroecaentluIhq wIM successivs ohneee Me
(6) Ia
l~np ~mEes~a s~~ aCins~ni~"~"aw~ mb o re0uo~~s snaii na ne wnawed ro ne a permn ror, nor en e~rwai m, aro viaauon a ure Prov~ions
M the bWb
4 .r) ,r J~~~ f~
Chief Building Inspector
THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR
CALL: 2345933 24 HOURS PRIOR TO INSPECTION
DEPARTMENT OF PLANNING AND DEVELOPMENT Building Permit Number :
BUILDING INSPECTION DIVISION - 235-2855
CITY OF WHEAT RIDGE Date :
7500 WEST 29TH AVENUE
WHEAT RIDGE, CO 80215
Property Owner : E?Ce/ihjpl_~r- ~%c2z~ Property Address : qe.~0 ~~f ~`70,~7"' ~ Phone
Contrector License No. : ~~f 73)
Company : S!~l;a, `/~G • Phone :
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT Construction Value :/S, 740-
I hereby certify that the setback distances proposed by this pertnil aDPlieation are accurate, PgfR111 FCe
and do not violate applicable oMinances, rules or regulations of the Ciry of Wheat Ridge or
covenants, easements or restridions of record; that all measurements shown, and allegations
made are accurate; that I have read and ayree to abide by all conditions printed on this Use TaX :
appliwtion, and that I assume full responsibility for compliance with the Wheat Ridge Building
Code (U.B.C.) and all ather applicable Whe t Ridge ordinance,(or work under this pertnit. TOt81 : $0.00 .
(OWNER)(CONTRACTOR) SIGNED DATE fz USe : ~ O(~
Description ~
7'X2v'~lov, ~.n.c~ ZctY'¢~o 1.
~6t~s . .See .r~torclud~ra.ws
BUILDING EPARTMENT USE ONLY
SIG Sq. Fl : ~L1D
~fApprCb' ov~al : U--X-
Zoning
amra~ t~~.ay.e ~ ~
,
-Approval: ~ , -
Approval
Occupancy : Walls : Roof : Stories , esid ' :Units :
Electrical License No : Plumbing License No : Mechanical License No :
Company : Company : Company :
Expiretion Date : Expiration Date : Expiration Date :
Approval : Approval : Approval :
(1) 7Tis permit was IssueE N axadance with the piwisions sM lorth In yopur apqicadon and Is su0ject to Ne laws ol the State ol CobnOO antl to the Zoninq
RegulaUons anC Buildiny Code of Wheat Rid9e, Cob2Co a any oNer applKable atlinances ol the Cily.
(2) This pemN slwll ezpire d(A) the work a Wwnzed is ml wmnxnced wnlum sbM (60) days hom Issue Oaie a(8) the buddhq auUaAzed is auspended or
aEandoned la a peAOd of 120 days.
(7) If Nis pemM expires, e new pemut may be eCqulfeO Iw a fee 01 ane-haN Ne atrounl rwmully fequired, proviEeC no Uanges have been of Will be maEe in the
original plaro and speafirations and airy suspension u abandonmeni has mt exceeCeE one (t) year. II Cwnges are made a if wspensbn or a0andonment
ezceeds ax (1) year, NII tees shall be pal0 !or a new Pem,ii
(4) No work of arry manner shaU be done thal will thanqe the natural flow ol waler wusing a 02inage poblem.
(5) Contraclw sfull raGh Ne Builtlin9 Inspecto r lwenry•lour (24) Irours in aavance ta ail inspections ana snan receive wrinen aOWn"+l m inspecUOn nrE belore
orxeedmg wah su~cesslveph axs ot Ne~o6
(e) 7ne issuance,~/ a pemut a tha apqoval o! tlrnNnqs anE spedfKa6ons shall nol be mnsWed lo be a permil lu, nor an approval o( any vlolalion W the proWsbne
. d the buildirtycoEes a arry otner oreinance, ww, ruie w repuWiwn. ^
7 45"C/
Chie w ding Inspector For Mayor
THIS PERMIT VALID ONLY WHEN SIGNED BY THE CHIEF BUILDING INSPECTOR AND MAYOR
CALL: 234-5933 24 HOURS PRIOR TO INSPECTION
`~A
04i30i98 13132 S 7709019
0lMN1TMENT OF
rypW~~•,w~n~YEMUE WLqNO
tSrgm v o Wt W CITY OF
CENTURV SIGNS P.02
PENMIT N0. MiQ0~:~37
im Aowclm . • uccak W &J
T~'3r~• -
apnwe~a. ~ " ~ _ s i
71~
w1u[TjpGAsGIIqLJ qMl . '.i.p...~---
. i. TMl QUM~ MN My7M ryo
~ T
~wi}-~-_ iw. u i
saa . ww.unar' M.O 1~'
•~c.u~aK.wr~ort~rr us w... ~ r i-~- W- -m
4 rrn w rw• *wlcx o~C] t"" nmft 90K ow~-
erat[~u~_
► - ' [~w_._ 1r.~NM~Mxwrwa+«
n~ 1. ~[f WIA
Mdt
~ I
ar~ IKt+a a*nw uta.na rcrx,ww,a mMUF1mucrux,aw+o oau~cu ~■or narc 'o✓
a p~qsereur rnlOto) .
tf s;.4'Ab,~w /92Am+°' ~
S~Q
f '
91GY 61pAM7[~ PIM 7K MIW MIILCMfOM.IdWO Npllf/.i111Fttf,rD M10~GTY L1MEi1~~11[Wl
. . m MO~EIIf'I LNf.lqt MANMA OR /Yl11d0E OMfMICt. '._y-..
Mq,ICATION FOR 0.UMtMNG1 ELWRICAL:MU:NANICW- F"iMlt
~M rK,^E:ti pN1tJ~',.
d
K
W
~
~
~
x ~ u
ro ncRr
ai ~
rws •rKIWrqw wr.t. Mecalc A nVMMMi w w.~raM iXC Mbfar[o w
~C
tMT
1
y
0
KIYTMxL[KMEqOMtF11WMTL
.
MF7CMD.4ICALP[.It'!Y
A
PERMNT
WM
. . ELECTWAL PERNNT .
, . iu7El~ctNlExJ.
ST~iC LICCM4 MQ ~ r1X 1 y
ti isc
`
Il/ Vn
f ss
M n FT
H0
.
IUR~'GPI.R/MCTCp
~
GMNiEtCNWCL•~WS
0_rP..H •
~
~rt~~nw anYJ$W Wi►
~ MMTk !EA'Rfl
2
. .
c
,
10wL11 Mill•WCUi~
~..v. ~
1 .
~
rrN _ ~
I moMP M~
-qM n "/al1 •
iMmN MNIYMI
ONiM U NNFI
. tMNNHIMI
1M ZwM bok
. GfN d tM Nli
rINs11M N IM
PERMIt rEe 'Y--
aEF"vm
iwi Mu.rrli.r
anlond roat t
U!E TAX - _ ~
OL
p111n1111rU ONIF
I
`
hNl amNr run
TOTAL iEE
•
4
dCNer*N~N
. . .
. .
(1UG
M tie~ b11rM1
MN~ ~iN~, AM .
lPEC7 ~CiIY O} N'M7~7aeN
~
_
I~
t'v tr
:
1 NrM ~III MoN
X
;
.
od
i
;
05i83i98 85:38 $ 7709019 CENTURV SIGNS
Century Signs, Inc.
FAX TRANSMITTAI.
To: 5--Z-98'
Flromt _ 0~~ ~ Fax N: 211' 2 AS ]
Wc are sending you / pngea, iacludiag lhla cover shat. It you do
not recdve all the psges, or I[ you enoounler pny d[tfipilties with thls
lransmlttal, pleaw ca11303-721-6301 Immediately. Our FAX number Is
303-770.9019.
P.B1
4715 South Xanthle Street . Denvor, Coloredo 00237 Telephona (303) 721 •8301
k ~ ~A,
F- c d m
Z O G U
Oro
f• • N
Q~dN
W ~ N M
Q (D ► ~
F aM «
Z yma~
C C1 U
2~a o
O -a N n
W •7 M N
> m M
W "i
o M
F O
Z
~
~
~
O
U
V
~
~ Q
, h
~
~
T n
H E
a =
v)
o z
Z
v •w
d
a
c
N
N
~
L
Q
L
C
Ll.I
V
O
Z
Z
O
W
a
r~
O
e
h
4
~
v
2~
~
Q
'N
~
S
~
E
F-
C
0
U
N
a
N
C
~
0
~
~
m
>
(0
N
C
O
O
Z
❑
N
N
}
~
~
Q
~
c
O
U
N
d
N
C
N
w
~
~
~
h
v
N
0
~
~
O
u
v
N
c
~
`o
~
R
U
v
R
~
c
d
~
>
m
t
e
0
w
~
U
C
N
3
.
O
U
N
d
~
~
n
0
op.
~
v
N
m
0
_
e ~r ~ •
~ •
~
J
0~ i~ t, ~~W
~ ~
-
~ ~
"'---v-. w ~ Z~
' a ~ I t, ~a
J i / ~ . w ai ~ ~ 1 TOW VARIES of
° r ' r a, a
r . _ r ~ ~ - i
- ,r ~ 5106
1 i ~ - - ~ I f
_
1 - 1
MATCH ECiSTING_Cl~~f'+6""" Q ~ 4 3 ~ ~ _ _ -a j ~ 3
8 _ . _ o _ - - _ _ ~ S , N 5101.34 RE ~ 2 „ ~ 5104 ~ y, ~ 2 ~ aI ~o
~ ~ MOVE AND 5085.25 REPLa,CE TYP OS a
183.63 E i cuRe _ ~ EL 5108.20 ; ~ . 2,~ N 5095.36 N 50B 1.65
i E 5166J2 E 5221.09 'I i i
EL 5108.20 ~ ~ EL 5106:0 D
~ 670"
r N 50805 ' MATCH ECISTING CURB ~ 50 E 5166.39 c,' ._,.l
~ 5~0 - - - EL 5108.00 ~ ~ ~ E~ 054=1.5" C US ED ROCK OR AE E
,t, I t / ~'3 , ~
1M/t5 I
51r;.~0 _ . E 1 ~ ~ CANS ~ ~ TRH / _ 5toa ,
~ I _ _
, _ ~
-•165. l .i _ ; ~ i SECTIQN A-A
~ u .18.5u- _ ~ 1~~ t ~ i
I I ( 'I
~ I ~ t j 1 ~ I ~ 4&" VALLEY GUTTER E _ ______.j 24" TYPE II GUTTER 24" TYPE II GUTTER
I i ~ i ~1 : -_1__-- 2~+ ! .NF j
OUTFLOW _ _ _ _ _ i_ 1 ~ ~ -
' ~ _ 1 ~ } ~ - - _ _ _ 4 A ~L ~ ~ ~ cPH T 1 1 ~2" i 1
i ~ BIB + ON CURB ~ j ~ ~ , 7 ~ ~ Q ~ --i . _ i 2 ~ -t _ c
El 5109.5 'i ' ~ ~ ! cv ~ - i ~ T ~xB WIRE M .~LQ
~ , ~ i ~ _ _l- j ~ ~ ~ I ~
i ' ~ i ~ ~ I } I ~~~~~o A r~
~ _ ~ ~ 3 y i
I ~ 1 in
i..~., ~ t ~ I I . _ ____J 1_ro_ _ .
3 C~ ~IQ I ~
' i { ~F ~ ~ ? ~ 1~" TYPE .GUTTER ~ 18" TYPE IGUTTER
i s I a OUTFLOW I INFLOvU
t i i I I i ~ 1~ E L 5 t 06 ~ I T
~ ; i i f I ____J T__..-Y_ 4
a ! ~ ' II ' ~ ~ q'
~ : _ I ~ u ^ , ~ 1 i I i ~.t_.,.1 v I\ L_.. I r ~1 ~J I v i ~L_._ I V L~ - „ Q ~ li r ~ ~ , ~ GG~.~= 1.~ ~~RAVEL ~ ~ ~ , i ; - - _ _ ;
~ I r I _ ~ i i ~ r ~ ~
i~ ~ i f ~ ~ ~ ~ ~
_ ~ ~ ~ r~,,, ~ ~
~ ~ '
N j -r, o ~ ~ c~ r ~
~ ~ i w r E t z ~ Q EXTEND NEW ASPHALT TO EDGE OF BLDG - _ - _ ____e-._ _ ~ _ I ~ ~ ~
h4 f,. _ _ . ~ I , p EL 51 t0 '
~fl8 _ . ~ ~ w ~5 v--" I .,t~,r j-- ~ - ____.__-._J I ~ 0.--'' r 5107.50
e.o _ _ ~ - ~ r 76 - S t 06.5 4 ~
1 ~ ~ - - - - slm.oo ~ X y
I I 6-'' r' ~ ~ ~ - v _ _ _ _ _ _ _ _ ToP_oF cRAVE~ E~ stos _ ~ _ _ _ _ CONCRETE LID EL 51O6.a
~ NEW-'flPF j v f H-20 RATING REQUIRED
° ?,,f N ~92t 06 5103,0 - E 5222.46 _ a n._ ~ #4 TYP ~ __.~_._e__ hanntuni c' no~n~inir anfn nrnrrn
_ -.~p o rr . ~ v_ . _ _ _ ,r' i MBER EL ~a107.00 - _ ~ ~ ~ N 49 t s. s6 S 8 9 2 2' 15 ~d REF~DVE 1~rlsi7NC ~ri
r„ ~ i ' / - ~ - E 5 t 22.47 - CURB AND REPLACE W~_T1GPE Ih'CURB ~ _ I ; ~ 00 ~ EL 5106.75 ~ OO.QD- REMOyE..~l$TING~°GRAVEL AS NECESSARY
t t 570 ~ , --AND REGRADE TO TOP OF CURB, REPLACE GRAVEL
{ ,.f y/ . t ( ~ ~
5 r~ S _
1 i j ~ ~ ~ ~ I ti„ ~
~ 1 ~ 1~1 ~ - ~ / ~ s ~
~ ~ _ BUDDING 1 E , ~ ~ ~ i
~ , I ~ I a C_7 I
• 1 1
I ~ ~ ~ r`~ ~'j-" REGRADE TO TOP OF CURB a I i ho C~1. DRY SEED i
I 1 i ~ END Olr NEW ASPHALT ~ . _.,~46 i
~ _ / o l _ _ r
t I ~ ~ ~ Q
, ' 12" CONCRETE WALL TOW EL 5106 ' ' 0 ~ Tyr ~ c ~1a - _ ry~G
_ _ _ - ~ 101,10 _ . , N 4860,98 ~ • ~5~ ~
6i • ~ 5104 ___-------------m------ E-5050~~- f ~ N 4860.15 ~ EL 5106.04 ~ ~j ~ ! GENERAL NOTES I I'' , ~ ~ ~
i ~ ~ ~ E 4957.84 i / ~ , U ~ 5..19,694 _ I i j ~ ~
A i i i 5104 ,''f 1 I _ ~ ~ o I a i - - , ~ ~ ~ ~ W I ~ 1. ALL CONSfiRU TION W i
! ; I " ~ ~ ~ ~ - ~~.5~0 ~ ~ ~ ILL CONFORM TO THE REVISED I ~ i ,I I ~ ~ ~ _ i , _ - ~ f GATED J11~4E 28, 1993 AND ADDENDUM A DATED J~
dd I r5 ~ - i ~N 4835.31 N 4835.56 j N 48~j5.87 ~
~ ~ 6 4977.98 E 5068.84 5036.71 I r ~ ~ ~ ?~I ~ i_____ __._-------__~_..~W__.~~.:~„> . ~ 2. ALL CONC~ETI SMALL BE 3500 PSi UNLESS OTHERWI'
I ~ ~ ~ ~ ~ -ti 5100 I j ' 9 00 0
1 ( rt ~ i - ~ € ~..x' ~----~E -~---~F-~-~---~f-~F---- ~ ~ ~ i ~ ~ ` ( 3. CONTRACTOR WILL VERIFY ALL UTILITIES PRIOR TO C01
_________________________.a ~ / E ~ r ; ~ ~p N 4810.97 N _ i 481 1-- ~ ~ , D. 5 ~ , UTILITY NOTIFICATION 534-670 - ~ 0 (2 DAY NOTICED RE
I ~ i i ~~"9~E 4956.25 EL55~06 5 ~ i ~ - r---~ t I ; : .6D ~
(~,~~I, r EL 5106.00 ~ 56 i ~ , ~4.__________~_._________-._-__.______ . ~ g108. ~ I ii ~
~ ~ ( ~ 12" eoNCRETE wa~L TDW EL 51~D6 - - 4, CONTRACTOR fS RESPONSIBLE F~-OR COORDINATION W'" i I i z _ ir1 ~ ~ I A D r, 106.___-_. N ADJACENT PROPERTY OWNERS T
~ ( ; I _ ~ t _ _ 0 MINIM~~E DL~T1 i
j I ~ L_,~___ _ _ _ ~ _.____~_?-~51 ~ .v_ . _ _ : ~ = ~ 5. ALL OFFSIDE WORK iS SUBJECT TO WRITTEN AUTHORIZE u
4i9ss6 THE A JAC -E 5t23.~4 t D ANT PROPERTY OWNER AND IS TO BE FURf'
TYPE ~ CURB~'~ ~ ~ ° r , ~ E:L. 5169.50 t S 8~ ~3 ~ 7 W! ~ 4' vazl_EY GUTTER THE PROPERTY OWNER OR AGENT.
~ t
~,~.~a
SAW GUT EXISTING
PAVEMENT S~oNP,i ' {98.30 I-70 FRONTAGE ROAD I
I j } L_ 1U1ltL1\.~~\` _ s
i 20 40 60 C TENTlO1~,~PARKING IMPROVEMENTS PLAN) PROJECT
I
SCALE OF FEET i TYPICAL SECTION -~t~'AN IIYil
E DESIGN
NTH i ORAF LING
(CHECr ED i j I DATE: JUL 1994 DWNG. NO. 1 OF 1
I
~ 30'x? ~ ~ i.:~'~.r{"t~~ .r".
r . ~'~$irlftC,. rr - 1
C: ~ .Jt ~ f~
" ~ J ~ a
~ ,
1__._.. ~ ' ~ i ~ ~ ~ i
`°h ~ ( r" /~'"'.F~~P ++'e/~`~.,,,u' ,+"'r fib f'7'°'° ~.`r<' ""s.,a,. rP'c~ ~ f
i I _
I ~ ~ ~ + ~f1C.~ !LL UPT ~ 63.
a~n t ~r~a emen en er ~ ~ , f
_ F
, ~t~~F, i~_ ~ w, , ~ ~ -
i :r ~ t
~ 1 f , ~ ~ ~
i ~ ~ i
i I. i
i i
_ ~ , i ~t ~ ~ ~ ' ~ ~ ;
t ~i ~ i
i ' E r~ f i ~ I
~ I
i
i I
i r
~ ' t ~
_ _ _
AP
S. , ' 4 ..i-_.
J ,
1 _ i r~~ t
-1~ ~
. Pia
~i~ned...
i _
_ _ - -
i
'his design is khe exclu~ivB pPbpert
C,enttary Signs, Inc., and cannot be reprndi
~ f , ,.J i , slthe~ kn whale ar iri park wikhouk 1
written consent. ~ ~
t APPRC VEf? BY: 5CAL.6i~,,^ty.~~~~ DRA~+
6RAS~
7T Y 2: PFINTEU Gtd Nn. t(~7gN GLEARPPIi~7 <
J _
i
f ~ ~ ~ ~ I
f ~ ~
l f I j i y j
~I I /
f I L_-_ ~ ~I ~
- ,.a I I~ i l i
I ! I ----t-- 10 I~
i a 1 i~
I; ii ~ _ D ~ I~ 'i i
;a ~I j ii l
r
I ~ I
~ ~ ~ ~ r i I i ii ~
~~I ~ ~ ~ ____I T.__.
I ~ ~ -r------___.__. ~ , ~
i E l~
I
i
i (w
^f , fyi
M
i
~ o~ 1
i
~ 1
'
I
~ I t
jai ~
1
i I I
~ - - ~ I
~ ;
_.._v~____ ~
e t
w i
in ~ __._r__ i i j _r _
~ ~ L _ _ = 1 ~ i
j ,hw~ i ~ ~
( r~ ~ 1 ~ ;
1 ~ ~ i ~ ~ t
d ~
t ~ ~
_1___v_~.~. ~
_ _ _r .~__.._.a~ _
~ ~ ~ t ,
~ ~i I ~"S, ~ ~3 I G
~_.___~~___w.._._.~.~. _ a__~.__.__.._.~___..________~_._w.._____.___ I
' f rDDm' Conference Rooms and Office Staf
- ~~~t~y iert,tla~ nm,b
~ t~ut~ {Kiilbd ie N rueor~4 m.
flew 3 Sl8 s.5. and S18 p, brd. partitions to ex. ceiling syste Nevi ~ 5l8 ss. and 5f 8 gyp. brd. partit~Dns ~ 9g ~~wou~:,~a,~~,,,~~a~„,~ ~ nd attenuatian insulation inside new wa11s. insta 1 sound attanua~tion insulation inside n
Its~elit~di ~ n s~ a~~ s 0 l~
~~,~.,I~~. ~ nd an@ls on interiorsldes of new conference room and RemD~eir@lobate existin track 1i htin as r +~r Inst-all 112 homosote sou p g g g i
cate NV su land return ri?les as n ~h11t1Ul,,99.~gbtwtbk new Dfflce under new gyp.brd,. Re1D AC pp y 9
i n ou ide of new wa?ls 4'. t install 4 sound attenuation blankets above ex, veil ng a is exist ng cellingsto remain, repair as necess 110 dwlb f~Nt 11tH
ilia the at ex. rid insid@ of new conf. rm. and office, ex. rid is to remain. lbstal ~hr@~ fixed ~rindows in West wail of Remove ex. ce g g g
a ukrMA~ arn~tt Sao 14t ~,<~~~~~I,x~~~,~~, ~ i in ide conf.rm. and aff ice at 8' a.f.f. with iddl w w centered at existi~ dD « lnsta?l new ceding system to match ex 5t g ins m e indo tD be g
j r ware tD m8
4 sound blankets fnsta ?new door, frame, and ha d ~ ~
i Remove/relDCate ex~st7n track l~ ht~n a5 necessary to clear new walls typ. both areas }nsta,~ outlets ar~d telephDne stubups to abD~ 9 9 9 ~
Df construction. PrDV,d@ n@w recessed 2 X 4 f?DUrescent ~gl
i areas: Provide new recessed 2' ~ 4' flourescent light fixtures in cDnf.rm, and Dffiee as nec. to ?~stail light switdb~es at ?DCations shawn. Generai Votes BDth
pro ide adequat 9 9
~ n dimmer verif si~in and
P aide car et~ rDtect~on Burin c~nstruetian.Relocate two strips of traak lighting into new conf. rm a y g ra p p g
w .C.. Provide dust barriers Burin construction ~raund both areas, location 1 G g I
' w is doors doDr fremes to match existln . Relocate HVAC suppl and return grill@s as necessary for new constructiDn, provide Pant al g y
veb tD match existin . additional suppl and returns if required. instal? co ase g y
' i w' u l cDntrol into new ceilin of conf. rm. duct exhaust ' ite rnana ement 24 hours in adyan`ce. l~stall exhaust fan nth ariab @ g a Schedule a~~ outages with Dns g r
°'n r air all ceilin s as r@ aired iron construction. trirDU h roof rovide all necessar roDf 'acks, dampers etc.. Provide new cEiiing t~il@ to m,stch exists g, ep g q g , p y l
' ew dDDrS frames and hardware to match existin rovide lockset at office door. Protect all e~istin iinlshes. ~n5tall n 9~ P
v' n u of areas. insta?1 outlets and telephDne stubups to abDVe ceilings at locations shDwn. Pro id@ .daily pleb p
l~stall li ht switches at locations shown. 9
f
~ . heet ~1 1,~ ! n ~ t
i ~ li"1~~ y a ~ S ~
~ ~ 1 9 ~ r ~ i5SDe5 and REV1si0nS. ~ ~ p d r~ ~ G V
1 ~ 'J ~ U l j I l ~ 'v _
____.,~.v....__._~._..~,.~.~.__-.._..._..~...__.__r~m_....mn.~_..v._..____.__,_______~........a,..~.._.__._.~..___~_~. ----.---...~......w_.____..__..~._._._.___,~.___,.~......~_.__.__._..~.__~__._~__..~___~~__..._.~_._~____.,..~._.__.___________.~_._._~__.~...__ ________.m..._ _ r^_~..__ ~ _ _
Lt, 1t
$ign~d C~ ~1 ~
P~ .Checker
i
z1J*`
i
L
2010 rt
I
{
i
i
-R'EmU 1`I7' zt X Z57',"Jf CT G L~ 1 Y E"T U fri l 1~; (t G t X ~Y ~t '
CJLl1tr- >=7tZl~,
UlE~mF'Lk1' ~UL7?~ l CLUE ~Z_--7 57 77c#1(~ ~r,Af i'% GDP1,<
~iL7~J~,~ E.' X63 D Z Ted L Cyl~? xi tr2 ~f5 ~ ; u' ~L c v PA
L/614r- .s1~10 7-ZD(7 U/EC 77? 1n Oq i-4 dVI L-61 6,
Century Signs, Inc.
This design is the exclusive property of
Century Signs, Inc., and cannot be reproduced
either in whole or in part without their
written consent.
_ j II
2~ ! o" -t~-' J
V4 77
- - 1~D7~, ~tJ2v ~ " ,~`~u/2~~ 7'7) ~r~%~1f=`,~ ~~:Jl'~:1"✓!~~/l~
LTHCARE
r L7Lw-/' ~ ! r~ = - ft-t"', G -5-1
f „
_
_ 3 U) L O I A/Er del D U~f7 / k ? i~c
/2Lb V.
~a~r, -ALU~r r ~1r CZ
17-,A?GTNGa~t, % x~ G2~ nl 3(--3 S°(o Z),0,4civc VfAft// COPY,..
Alo /LLtJnI/Alt}TIL~/f.,.
'4 Z- 114,1171-
X nIR~~a i su[ rzl n/ BZ
L),;7 _7Z, /37 7-X'444f Lj.,,G-r2-- V;X-) _ Care r
E E- I 7-EA -1
LiL - L' 4A/ -144AlXIEZ Z-E-r72EA-~.> Lt,)1T~ ✓5 R?LU1Y/F-1EJ~ ,edk!f
l ~'F'ROt1~.C ~CZtJ~f7~' TFfl9".':~'t.~rr.
7.Uffr~"~' (o'J!1/~+^ iLLe//r'le/'JC°'t7UA.id>IUD VL%Trr
Xa~JPC P.' ~v~rp < i` v~ _sb 3v; -157 Thar%<<C~cer:'`_ YirJ> orgy -
77-Af iEl: ~RE7l~ 3~3G-?~(~ TC'KfF1SLuGtX1 r VIA)
<b MRIGHT 199P
Century Signs, Inc.
This design is the exclusive property of
Century Signs, Inc., and cannot be reproduced
V, either in whole or in part without their
written consent.
,-t
7,,6;
Vc-