Loading...
HomeMy WebLinkAbout3800 Zephyr StreetMay 26, 1998 Mr. Anson Andrew, P.E. Futura Engineering, Inc. 12741 East Colfax Avenue, Suite 126 Englewood, Colorado 80111 Re: Zephyr Medical Commons Phases 3& 4, 3800 Zephyr Street_- Approval of Final Drainage Report, Street Construction Drawings and Grading/Erosion Control Plan Dear Mr. Andrew, This letter is to inform you that the final drainage report, street construction plans, and the grading/erosion control plan for the above referenced project have been reviewed and approved for construction. Please be aware of the following items regarding the construction of the project: 1. The proposed drainage facilities shall be constructed and approved by the City of Wheat Ridge prior to issuance of the Temporary Certificate of Occupancy. 2. Erosion control for the project shall be placed in conformance with the approved drainage/erosion control plan and shall be maintained as needed during the course of construction. 3. All drainage improvements shall be constructed in conformance with the approved drainage report and plan. 4. It will be the responsibility of the contractor for the project to repair any damage to the existing public improvements on Zephyr Drive and/or West 38`h and West 39c" Avenues as a result of related construction traffic in the area..Also, the contractor will be responsible for maintaining Zephyr Drive, West 38`h and West 39th Avenues on a regular basis such they are free of construction debris and tracking from construction traffic accessing the site. Mr. Anson Andrew, P.E. Futura Eng., Inc. Page 2 5. Upon completion of the drainage improvements the engineer, Mr. Anson Andrew, P.E., Futura Engineering, Inc. shall provide to the City of Wheat Ridge a letter of certification stating that the various improvements, as defined in the drainage report and plan, have been accurately surveyed to confirm that their construction is in accordance with these documents. The certification letter shall be written and stamped by the engineer who prepared the drainage report, and shall be submitted for review and approval by the City prior to issuance of a Certificate of Occupancy. If you have any questions, please contact me at 235-2868. Sincerely, Greg Knudson, M.P.A. Development Review Engineer cc: Bob Goebel, Public Works Director Alan White, Planning & Development Director Dave Kotecki, Sr. Project Engineer Steve Nguyen, Traffic Engineer Meredith Reckert, Senior Planner John McGuire, City Surveyor Reid Gamberg, DRG & Assoc. File