HomeMy WebLinkAbout3800 Zephyr StreetMay 26, 1998
Mr. Anson Andrew, P.E.
Futura Engineering, Inc.
12741 East Colfax Avenue, Suite 126
Englewood, Colorado 80111
Re: Zephyr Medical Commons Phases 3& 4, 3800 Zephyr Street_-
Approval of Final Drainage Report, Street Construction
Drawings and Grading/Erosion Control Plan
Dear Mr. Andrew,
This letter is to inform you that the final drainage report,
street construction plans, and the grading/erosion control plan
for the above referenced project have been reviewed and approved
for construction. Please be aware of the following items
regarding the construction of the project:
1. The proposed drainage facilities shall be constructed and
approved by the City of Wheat Ridge prior to issuance of the
Temporary Certificate of Occupancy.
2. Erosion control for the project shall be placed in conformance
with the approved drainage/erosion control plan and shall be
maintained as needed during the course of construction.
3. All drainage improvements shall be constructed in conformance
with the approved drainage report and plan.
4. It will be the responsibility of the contractor for the
project to repair any damage to the existing public
improvements on Zephyr Drive and/or West 38`h and West 39c"
Avenues as a result of related construction traffic in the
area..Also, the contractor will be responsible for maintaining
Zephyr Drive, West 38`h and West 39th Avenues on a regular
basis such they are free of construction debris and tracking
from construction traffic accessing the site.
Mr. Anson Andrew, P.E.
Futura Eng., Inc.
Page 2
5. Upon completion of the drainage improvements the engineer,
Mr. Anson Andrew, P.E., Futura Engineering, Inc. shall provide
to the City of Wheat Ridge a letter of certification stating
that the various improvements, as defined in the drainage
report and plan, have been accurately surveyed to confirm that
their construction is in accordance with these documents. The
certification letter shall be written and stamped by the
engineer who prepared the drainage report, and shall be
submitted for review and approval by the City prior to
issuance of a Certificate of Occupancy.
If you have any questions, please contact me at 235-2868.
Sincerely,
Greg Knudson, M.P.A.
Development Review Engineer
cc: Bob Goebel, Public Works Director
Alan White, Planning & Development Director
Dave Kotecki, Sr. Project Engineer
Steve Nguyen, Traffic Engineer
Meredith Reckert, Senior Planner
John McGuire, City Surveyor
Reid Gamberg, DRG & Assoc.
File