HomeMy WebLinkAbout3920 Reed StreetINSPECTION RECORD
Inspection online form: http://www.ci.wheatridge.co.us/inspection
Cancellations must be submitted via the online form before 8 a.m. the day of the inspection
Inspections will not be performed unless this card is posted on the project site
Request an inspection before MIDNIGHT (11:59 PM) to receive an inspection the following business day
_j
PERMIT: ill' ADDRESS: G'� ?r t _ JOB CODE:
Foundation Inspections
Date
InsInt ectactor
Comments' t}i
102 Caissons / Piers
103 Footing / P.E. Letter
104 Foundation Setback Cert.
105 Stem Walls
106 Foundation wall Insulation
Do Not Pour Concrete Prior To Approval Of The Above Inspections
Underground / Slab Inspections
Date
Inspector
Initials
Comments
201 Electrical / Cable/ Conduit
202 Sewer Underground Int.
203 Sewer Underground Ext.
204 Plumbing Underground Int.
205 Plumbing Underground Ext.
206 Water Underground
>�
Do Not Cover Underground or Below / In -Slab Work Prior To Approval Of The Above Inspections
Rough Inspection
Date
Inspector
Initials
Comments
301 Rough Framing
302 Wall Sheathing
303 Roof Sheathing
304 Sheer Inspection
305 Insulation
306 Mid -Roof
>�
307 Metal / Lath / Stucco
308 Rough Electrical Residential
309 Rough Electrical Commercial
310 Electrical Meter Residential
311 Electrical Meter Commercial
312 Temp. Const. Meter
313 Rough Plumbing Residential
314 Rough Plumbing Commercial
315 Shower Pan
SEE OVER FOR ADDITIONAL INSPECTIONS
PERMIT: f(, ADDRESS: t to � JOB CODE:
Rough Inspection (continued)
Date
Inspector
Initials
Comments
316 Rough Mechanical Residential
317 Rough Mechanical Commercial
318 Boiler / Furnace
319 Hot water tank
320 Drywall screw and Nail
321 Moisture board / shower walls
322 Rough Grading
323 Miscellaneous
Final Inspections
Date
Inspector
Initials
Comments
401 Gasline
402 Gas Meter Release
403 Final Electrical Residential
404 Final Electrical Commercial
405 Final Mechanical Residential
406 Final Mechanical Commercial
407 Final Plumbing Residential
408 Final Plumbing Commercial
409 Final Roof{;'E
410 Final Window/Door
411 Landscape/Park/Planning`
Inspections from these entities shall be requested
one week in advance.
*For landscaping and parking inspections please
call 303-235-2846
**For ROW and drainage inspections please call
303-235-2861
***For fire inspections please contact the Fire
Protection District for your project.
412 Row/Drainage/Public Works**
413 Flood plain Inspection**
414 Fire Insp. / Fire Protection***
415 Public Works Final**
416 Storm Water Mgmt.**
417 Zoning Final Inspection*
418 Building Final Inspection
Note: All items must be completed and approved by Planning, Public Works, Fire and Building
before a Certificate of Occupancy is issued. Approval of the Final Building Inspection does not
constitute authorization of occupancy.
For Low Voltage permits please be sure that rough inspections are completed by the Fire District and
Electrical low voltage by the Building Division.
The City of Wheat Ridge
Third Party Form Check List
Property Address
Permit Number
Permit Issued Date — 2 i
Owner Information
Property Owner Information-�'
Property Owner Address
Inspector Information f
Inspection Company
inspector Name
Inspector Contact info.
Inspector Statement and Acknowledgement
* i hearby acknowledge the roof I am inspecting is 6/12 or over. All roofs
that are under 6/12 must be inspected by the City of Wheat Ridge Buiding Dept.
* I hearby acknowledge the roofing system for the referenced building has been inspected
and found to be in compliance with the minimum requirements of the 2012 IRC and 2012
IBC as well as all City of W4eat Ri Policies and Procedure and Manufacturer's
recommendation e ifi i 2�
Inspector: Date:
Property Owner Statement of Acknowledgement
*1 hearby acknowledge that I am the owner of the building referenced above and I give
my consent for the listed third -party inspection company to perform my roof inspection
in lieu of the City of Wheat Ride Bu'iding Division inspection.
Propery Owner/Agent: Date: D'� .� n
I
This original document and permit card, as well as the roofing check list, must be submitted tc
the Chief Building Official within seven days of the final inspection_
Drop off in person
Permit counter 2nd floor
7500 W. 29th Ave
Wheat Ridge CO 80033
Draft Date: 7/26/17
Please add note to reverse side
The City of Wheat Ridge
Inspection Check List notes
Mid -Roof
_hoof Inspectiart
__1 N/A [J Pass f ail
pass ❑ foal
Structural roof components
I'A X-111 I ail
Verify that no more than 2 layers of shingles exist
�',]/'A Pass latl
Flashing for roof and walls
Fa
If new sheathing is installed verify that it is listed in the
permit description (Valuation must be adjusted)
).'�J A Fail
Verify sheathing nail pattern ( See policy & Proceed ures)
J J Pass [I Fail
Crickets and saddles where needed
NSA Pa , s L] Fail
Verify B vent must have boot same gauge as pipe
1"11A Pass ❑ Fail
Verify vent caps
f'l /A Pass _j Fail
Verify no flashings are damaged or rusted
N/A rly;s F
.1 Fail
Step flashing shall be min. of 4x4 piece per shingle,
' '��rr'144 [ ] Fail
Verify Scuppers allow for proper drainage
_� N'/'A [-] Fail
Ice and water shield 2' in heated wall spaces
Pas' ❑ fail
Underlayments must follow 2012 IRC / 2012 IBC
Pas,, ❑ Fail
Verify roof slope for proper drainage
N/A ra S'Fail
Dripedge shall have min of 2" overlap
_J P1 Pass [,-] Faii
Dripedge should extend down min 2" past roof deck
pa'�' l
"'/%
" YJ
-
Diipedge shall be mechanicaly fastened 12" OC
rTA
90 1_13 roll roofing shall not be applied to roof slopes
less than 2:12 slope- Exception, detached garages,
patios, carports, open on three sides with min. slope of
N/A
I,1 Pass
112
Modified Bitumen, EPDM, TPO min slope 1/4:12 slope
III/A P'ns5
Above roof insulation R-25
r,"s LJ F--,il
Below roof residential R-38
N/A J Fiil
Below roof commercial R-32
(1)111"n 1--] Fal
Modified Bitumen, EPDM, TPO min slope 1/412 slope
must be installed in accordance with the manufacturers
specifications- Must have manufactures letter of
warranty with the address on the letter for final inspection
Metal Roof h ng
S
r]/A
Metal roof shingles shall not be installed on slope less
3:12
Pass Fail
Metal valley flashing shall be the same material as roof
VN/(1 P-, ❑ Fail
Metal valley flashing shall extend a min of 8" from the
centerline with a min. of 3/4 " high splash divoiler
rib built-in at the flow line with sections overlapping a
a min. of 4"
_Iije Roofs, Re Ly .
--Lr e rn e 11 b�
1 (JFoii
(c,lay and concrete the shall have a min. 2-1/2,12 slope
Slopes 4:12 and under require double underlayment,
The City of Wheat Ridge
Inspection Check List notes
Mid -Roof
Notes
Company Name:
Inspector signature:
Date of Inspection:
The City of Wheat Ridge
Third Party Form Check List
Property Address 3cr'---U 2�
Permit Number
Permit Issued Date 4�7
Owner Information
Property Owner information
-_— L—,—
Property Owner Address C)
Inspector Information
Inspection Company
—_ =
Inspector Name
Inspector Contact info.
Inspector Statement an,d.Acknowledaernent
I Nearby acknowledge the roof I am inspecting is 6/12 or over. All roofs
that are under 6/12 must be inspected by the City of Wheat Ridge Buiding Dept.
* I Nearby acknowledge the roofing system for the referenced building has been inspected
and found to be in compliance with the minimum requirements of the 2012 IRC and 2012
IBC as well as all City of at Ridge Policies and Procedure and Manufacturers
recommendation n s 'fi tions.
Inspector: Date:
Property Owner Statpinkent of Acknowledgement
*1 hearby acknowledge that I am the owner of the building referenced above and I give
my consent for the listed third -party inspection company to perform my roof inspection
in lieu of the City of Wheatection.
Propery Owner/Agent: 7&== Date: r� /fig'
This original document and permit card, as well as the roofing check list, must be submitted tc
the Chief Building Official within seven days of the final inspection.
Drop off in person
Permit counter 2nd floor
7500 W. 29th Ave
Wheat Ridge Co 80033
Draft Date: 7/26/17
Please add note to reverse side
The City of Wheat Ridge
Inspection Check List notes
Final Roof
Roof Inspel,tion
❑ N/A
❑ Pass
Fail
i ll/A
❑
❑ Pass
❑ Fail
Structural roof components
N/A
Pass
❑ Fail
Verify that no more than 2 layers of shingles exist
❑ N/A
Pass
❑ Fail
Flashing for roof and walls
❑ Pass
[] Fail
If new sheathing is installed verify that it is listed in the
� %
�YJ N/A
El Pass
❑ Fail
permit description (Valuation must be adjusted)
Verify sheahing nail pattern ( See policy & Proceedures)
N/A
Pass
Fail
Crickets and saddles where needed
❑ N/A
(Pass
❑ Fail
Verify B vent must have boot same gauge as pipe
❑ N/A
[K'Pass
[J Fail
Verify vent caps
L] ] N/A
� Pass
[] Fail
Verify no flashings are damaged or rusted
❑ N/A
N/A
Pass
Pass
[] Fail
[]
Step flashing shall be min. of 4x4 piece per shingle
Fail
Verify scuppers allow for proper drainage
❑ N/A
❑
Pass
Pass
❑ Fail
Ice and water shield 2' in heated wall spaces
N/A
❑ Fail
Underlayments must follow 2012 IRC / 2012 IBC
❑ N/A
` Pass
❑ Fail
Verify roof slope for proper drainage
❑ N/A
Pass
[] Fail
Dripedge shall have min of 2" overlap
❑ N/A
Pass
[] Fail
Dripedge should extend down min 2" past roof deck
❑ N/A
Pass
[] Fail
Dripedge shall be mechanicaly fastened 12" OC
N/A
Pass
❑ Fail
90 LB roll roofing shall not be applied to roof slopes
less than 2:12 slope: Exception, detached garages,
patios, carports, open on three sides with min. slope of
1:12
tt
1 N;A
LJPass
[] Fail
Modified Bitumen, EPDM, TPO min slope 1/4:12 slope
Qv N/A
❑ Pass
[] Fail
Above roof insulation R-25
�f N/A
❑ Pass
[] Fail
Below roof residential R-38
N/A
❑ Pass
[] Fail
Below roof commercial R-32
N/A
❑ Pass
❑ Fail
Modified Bitumen, EPDM, TPO min slope 1/4:12 slope
must be installed in accordance with the manufacturers
specifications- Must have manufactures letter of
warranty with the address on the letter for final inspection
Metal Roof *shingles Rectuiremen�ts
�j
I N/A
❑ Pass
❑ Fail
Metal roof shingles shall not be installed on slope less
N/A
0 -Pass
❑ Fail
3:12
Metal valley flashing shall be the same material as roof
iJJ N/A
❑ Pass
❑ Fail
Metal valley flashing shall extend a min of 8" from the
centerline with a min. of 3/4 " high splash diverter
rib built-in at the flow line with sections overlapping a
a min. of 4"
Tile Roofs Ft�ements
N/A
I
❑ Pass
[1 Fail
Clay and concrete tile shall have a min. 2-1/2:12 slope
Slopes 4:12 and under require double underlayment
The City of Wheat Ridge
Inspection Check List notes
Final Roof
Motes
Company Name: 1
__J!M�A
[50tr of inspection:
*** CONDITIONS ***
Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be
required for both the midroof and final inspections. The 3rd party inspection report AND
THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat
Ridge. The report MUST BE SIGNED by the Homeowner.
REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec.
R806. The installation of ridge venting requires the installation or existence of soffit
venting. For calculation purposes, one hat or turtle vent equal to one-half of one square
foot of opening.
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name) roof
covering" is required to be on site at the time of final inspection.
City of Wheat Ridge
Residential Roofing PERMIT - 201801163
PERMIT NO:
201801163 ISSUED:
04/25/2018
JOB ADDRESS:
3920 Reed ST EXPIRES:
04/25/2019
JOB DESCRIPTION:
Reroof remove and install Cedur Synthetic Roofing
Shakes with 11 squares.
Pitch 6/12.
*Please provide manufacturer's installation spec. sheets. 3rd Party
Inspector Required*
*** CONTACTS ***
OWNER (970)250-5727 CUSTODIO JOSEPH M
SUB (303)218-6655 Zac Bardy 170212 Band -Timm Const. Holds Corpo
*** PARCEL INFO
***
ZONE CODE:
UA / Unassigned USE:
UA / Unassigned
SUBDIVISION CODE: 2405 / BARTHS, COULEHAN GRANGE, WHEAT BLOCK/LOT#:
0 /
*** FEE SUMMARY
*** ESTIMATED PROJECT VALUATION:
10,000.00
FEES
Total Valuation
0.00
Use Tax
210.00
Permit Fee
204.30
** TOTAL **
414.30
*** COMMENTS ***
*** CONDITIONS ***
Midroof & Final Roof inspections for ROOFS 6/12 PITCH & OVER: 3rd party inspection will be
required for both the midroof and final inspections. The 3rd party inspection report AND
THE ORIGINAL PERMIT CARD needs to be dropped off to the Permit Desk at the City of Wheat
Ridge. The report MUST BE SIGNED by the Homeowner.
REGARDING ROOF VENTILATION: Roof ventilation shall comply with IBC Sec. 1203.2 or IRC Sec.
R806. The installation of ridge venting requires the installation or existence of soffit
venting. For calculation purposes, one hat or turtle vent equal to one-half of one square
foot of opening.
Effective December 1, 2014, asphalt shingle installations require an approved midroof
inspection, conducted when 25-75 percent of the roof covering is installed, prior to final
approval. Installation of roof sheathing (new or overlay) is required on the entire roof
when spaced or board sheathing with ANY gap exceeding one half inch exists. Sheathing and
mid -roofs may be called in at the same time, one hundred percent of the sheathing must be
complete and 25-75 percent of the mid -roof may be complete. Asphalt shingles are required
to be fastened to the roof deck with a minimum of 6 nails per shingle. Ice and water shield
is required. Eave and rake metal is required. A ladder extending 3 feet above the roof eave
and secured in place is required to be provided for all roof inspections. Roof ventilation
is required to comply with applicable codes and/or manufacturer installation instructions,
whichever is more stringent. In order to pass a final inspection of elastomeric or similar
type roof coverings, a letter of inspection and approval from the manufacturer technical
representative stating that "the application of the roof at (project address) has been
applied in accordance with the installation instruction for (roof material brand name) roof
covering" is required to be on site at the time of final inspection.
w City of Wheat Ridge
Residential Roofing PERMIT - 201801163
PERMIT NO: 201801163 ISSUED: 04/25/2018
JOB ADDRESS: 3920 Reed ST EXPIRES: 04/25/2019
JOB DESCRIPTION: Reroof remove and install Cedur Synthetic Roofing Shakes with 11 squares.
Pitch 6/12.
*Please provide manufacturer's installation spec. sheets. 3rd Party
Inspector Required*
I, by my signature, do hereby attest that the work to be performed shall comply with all accompanying approved plans and specifications,
applicable building codes, and all applicable municipal codes, policies and procedures, and that I am the legal owner or have been authorized
by the legal owner of the property and am authorized to obtain this permit and perform the work described and approved in conjunction with
this permit. I farther a t4hAt I am leg 'lly 3aorized to include all entities named within this document as parties to the work to be
prme ithat w rk to be perfo a is 'd isclosed in this document and/or its' accompanying a p ov/e'd plans and specifications.
Signature of OWNER or CONTRAC ircle one) Date
1. This permit was issued based on the infor ation provided in the permit application and accompanying plans and specifications and is
subject to the compliance with those documents, and all applicable statutes, ordinances, regulations, policies and procedures.
2. This. permit shall expire 365 days after the date of issuance regardless of activity. Requests for extension must be made in writing and
received prior to the date of expiration. An extension of no more than 180 days made be granted at the discretion of the Chief Building
Official and may be subject to a fee equal to one-half of the original permit fee.
3 If this permit expires, a new permit may be required to be obtained. Issuance of a new permit shall be subject to the standard
requirements, fees androcedures for approval of any new permit. Re -issuance or extension of expired permits is at the sole discretion of
the Chief Building Official and is not guaranteed.
4, No work of an manner shall be performed that shall results in a change of the natural flow of water without prior and specific approval.
5. The permit holder shall notify the Building and Inspection Services Division in accordance with established policy of all required
inspections and shall not proceed or conceal work without written approval of such work from the Building and Inspection Services
Division.
6. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, an violation of any provision of any
applicable code or any ordinance or regulation of this jurisdiction. Approval of work is subject to field inspection.
SigndtMe'df f Bifi1difig-MriciAl Date
REQUESTS MUST BE MADE BY 11:59PN ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
Update Effective October 12, 2017
Installation Recommendations
Introduction - Ce®UR'" Shakes
CeDURTM Shakes are inspired by the enduring beauty of natural cedar shakes. CeDURTM is
manufactured using state of the art polyurethane technology that was developed to withstand
harsh: fire, hail, wind, and UV conditions. Discerning property owners choose CeDURTM as the
low maintenance, high performance roofing product that enhances the beauty and value of their
property. The product combines the beauty of natural cedar shakes with unsurpassed durability
and ease of standard shakes installation methods. CeDURTM Shakes are a lightweight, fire, hail,
and wind resistant product that are ideal for projects that demand a natural cedar shake
appearance.
CeDURTM Shakes are
• UL 2218 Class 4 impact rated
• Class "A" Fire rated without the requirement of a special fire-resistant underlayment.
ASTM E108, UL 790
• Rated @ an insulation value of R > 2.0 R factor (approximately 20% greater than natural
Heavy Cedar Shakes)
• 115 mph wind resistant rated for the "Standard Application" — at a 10" exposure. ASTM
E330, UL 1897 (warrantied to 90mph)
• Above 115 mph wind resistance installations are considered "High Wind Application" —
consult CeDUR"
• Resistant to water absorption.
• Colored throughout for stability and uniformity at cuts. Solid product, no cavity back.
• Lightweight (170 lbs. per Square).
• Resistant to rot, moss, and insects
• CeDURTM Shakes are protected by a 50 Year Limited Material Warranty.
• ideal for new construction and re -roofing applications for residential and commercial
projects
Design
CeDURTM Shakes are a realistic synthetic shake alternative with a nominal 3/4" thick butt edge
which tapers to 1/8" thick. It is manufactured in three widths: 5'/4 ", 7'/4", and 12'/4" & four
natural wood colors. The shakes are reproductions of natural wood cedar shakes. CeDURTM
Shakes provide a personal preference option for architectural compatibility, roof appearance, fire
resistance and roofing weight. Refer to the CeDURTM Shakes Technical Specifications for details
and coverage based on exposure and spacing between shakes.
Page l
Update Effective October 12, 2017
Pitch
The minimum roof pitch for CeDURT"° Shakes is a 4:12 slope. Applications below 4:12 are
considered decorative. For pitches under 4:12, please consult CeDUR for proper installation
recommendations.
Roof Framing
CeDURT`" Shake's lightweight system allows direct replacement of existing roof systems without
the structural evaluations and enhancements necessary for heavier roofing products. This
product feature also holds true for new construction. No unusual design or engineering
considerations are required. CeDURTM Shakes weigh approximately 30% less than Asphalt
Architectural Shingles and less than natural Heavy Cedar Shakes. CeDURT" Shakes are
approximately 80% less than the weight of standard Concrete Roof Tile.
Decking
Install CeDURT" Shakes on solid decking consisting of either code -complying, 15/32" thick
American Plywood Association (APA) rated plywood, APA rated wood panels, or other building
materials meeting these minimum requirements in accordance with DOC PS -1.
Temperature/Cold Climates — Storage & Installation
CeDURT"' Shakes should be stored at temperatures above 40°F and pallets should not be stacked
more than two pallets high.
CeDURT°^ Shakes can be installed in temperatures as low as 20°F.
Underlayment (For pitches 6:12 and above)
No special underlayment is required for a Class a Fire rating One of the following base
underlayment's is required as part of the normal application process.
One layer of Number 30 base sheet conforming to ASTM D 226 covering the entire roof
deck; or alternatively, synthetic underlayment manufactured for and utilized for shingle
underlayment purposes. Verify with the manufacturer that the specific base sheet is water
resistant.
Ice Protection
In areas where the average daily temperature in January is 25°F (-4°C) or less, install an
ice barrier that consists a self -adhering polymer modified bitumen sheet in lieu of normal
underlayment at the eaves. Extend ice protection underlayment from the eaves edge to a
point at least 24 inches (610mm) inside the exterior wall line of the building.
Valley's
Install a high temperature ice/ water barrier that consists of a self -adhering polymer
modified bitumen sheet in lieu of normal underlayment at the valley's.
To assure proper horizontal alignment we recommend that chalk lines be snapped frequently.
These chalk lines should be placed on the underlayment so that the shakes are aligned by the tips
rather than the butts.
Chalk Lines should be snapped on the underlayment with the tips of the shakes following the
lines. Do not snap lines on the CeDURTM Shakes or use red chalk as the chalk may
permanently discolor the shakes.
Page 2
Update Effective October 12, 2017
Note: A base (dry in) underlayment may be installed covering the entire roof deck prior to the
CeDUR'" Shake installation assembly described above as a temporary dry -in if desired or if
required by local building codes. The CeDURT" roofing system can be installed over existing
temporary dry -in providing the material lays flat and tight to the roof deck.
Underlayment (For pitches between 4:12 and under 6:12)
In addition to one of the base sheet options described above, install one layer of ASTM D 226
type lI 36 -inch NO 30 underlayment at the eave line. After applying the starter shakes, a
minimum 18" wide strip of interlay of ASTM D 226 -type lI (ASTM D 4869) No. 30 shall be laid
over the top portion of the starter shakes, the butt end of the interlay course extending up-slope
onto the sheathing and/or dry -in, approximately 9 inches above the fascia (For a l inch
overhang). After installing the field shakes over the starter shakes, position the bottom edge of
the next interlay on the l 0 -inch line of the interlay previously installed, with successive courses
laid on the 10 -inch line (or less depending on roof layouts less than 10") Refer to the installation
diagram following the written text.
Note: Felt interlayment on the CeDURI" Shakes is to be installed so it does not extend below a
line that is twice the exposure above the butt (i.e. a 23.5" shakes at 10", exposure would have felt
applied 20" above the butt). No felt should be visible between the side joints of the shakes
(keyway). Refer to the CeDURT"° Shakes Technical Specification Details.
Starter
CeDURT'" Shakes *'Starter" is to be installed at all eave-lines. Butts of the starter shakes and first
course of CeDURT"' Shakes are to project equally beyond the finished fascia as determined by
conditions to insure proper water drainage. Typical installation is a3/4" - 1 inch (25.4 mm)
overhang. Where gutters are present. the overhang may be adjusted to insure proper water flow
into the gutters.
Secure each 15" CeDURTM Starter with four corrosive resistant fasteners.
Refer to the CeDUR"m Shakes Technical Specification Details.
Gable Ends - Rakes
Extend CeDURT"' Shakes approximately 3/4 inch over gable - rake ends.
Exposure
A 10" (254 mm) weather exposure for straight-line installations is standard, and has been used
for all calculations, testing and certifications, and the basis for the product warranty. When 1"
staggered installation is used, shakes exposure is laid at 9" (229 mm) exposure and random
shakes are at 10" (254 mm) exposure or 1 " (25.4 +/-) stagger. The maximum recommended
stagger is 2 inches (8" exposure).
Spacing (Keyway) & Joint Off -Set
CeDURTM Shakes are resistant to water absorption. Expansion and contraction due to temperature
or moisture content fluctuations (hot/cold, wet/dry or freeze/thaw) is negligible, thereby
Page 3
Update Effective October 12, 2017
permitting the choice of spacing between shakes to be based on roof appearance only. The
minimum standard keyway is '/Q" and the maximum standard keyway is 3/8".
Note: The number of CeDURT"' shakes per square are based on a nominal 3/8" keyway.
Off -Set joints between courses a minimum of 1 '/2".
Packaging
CeDURTM Shakes are packaged with 7 each of 5 '/4", 7 'A", and 12 '/4" wide -pieces per bundle
(total 21 pieces). The pieces are 23-1/2" length. When installed with a Standard 10" weather
exposure and a 3/8" keyway, 168 field pieces or 8 bundles will cover I roofing square (SQ).
Closer spacing between shakes will require additional field pieces.
Color
CeDUR" Shakes will, by design, shift color upon exposure to the sun. This color change takes
place gradually over a four to eight-week period (depending on time and intensity of sun
exposure) and then stabilizes at a weathered wood color for the life of the product.
Installation
CeDURT" Shakes are applied on solid sheathing / wood board and plank roof decks in the same
manner as wood shakes, in accordance with National Roofing Contractors Association (NRCA)
guidelines and applicable building codes. Refer to the detail schematics following the written
text.
Workability
CeDUIRTM Shakes may be sawn, planed, sanded, nailed, stapled, and/or screwed with common
roofing tools and materials. It will not split to width in the traditional wood shakes installation
manner due to its non-fibrous and uniform composition. The shakes can also be scored with a
utility knife and snapped at the score -line.
CeDURTM Shakes requires no sealing or treatment to cut edges due to their closed cell structure
which permits no significant water absorption.
Fastening — Standard Application
Secure each 5 'A" and 7 '/4" CeDURTM Shake with two corrosive resistant fasteners; and, each 12
'/4" CeDURTM Shake with three corrosive resistant fasteners.
Nails: minimum 11 -gauge shank and 5/16" head, ring shank roofing nails (1 3/4" in length
typically).
Staples: 15/16" CRN by 16 GA by (l -7/8" in length typically). Building code dependent.
Screws: Corrosive resistant screws with a minimum 5/16" head may also be used.
Fasten a minimum 1" from shakes edge and place in the fastening zone 1" above the butt line of
the course to follow. Fasteners shall be of sufficient length to fully penetrate a minimum of 3/4"
into and / or through the decking. Do not fasten through the void area between shakes and roof
deck unsupported by the CeDURT«' Shakes course below. Fasteners are to be driven flush to the
product surface; and, not over driven or under driven. Fasteners are to be driven perpendicular to
material face. Non-compliance to these fastening requirements may void the warranty.
Page 4
Update Effective October 12, 2017
Pre -formed one-piece units (10" (254 mm) exposure). Two concealed standard roofing
fasteners per side (see fastener section — increase length) are required at the over -lap. Install 1
layer of #30 felt under the hip & ridge pieces.
Pitch Range for Hip & Ridge - Factory Formed
4:12 — 7:12 Low Hip: Low Ridge.
Above 7:12 — 11:12 Low Hip: Medium Ridge.
Above 11:12 — 14:12 Medium Hip: High Ridge.
Above 14:12 — 21:12, Ridge to be field assembled per below instructions
Two Piece — Field Assembled
CeDUR" Shakes supplied for this Hip & Ridge option are 5 1/4" wide field pieces. The Weather
Exposure is the same as the field exposure of the roof shakes. Pieces are to be alternately lapped.
Standard roofing gauge fasteners of sufficient length to fully penetrate roof sheathing / boards is
required, placed two per side, driven a minimum of 1" from each edge, and 1" - 2" above the butt
line of the course to follow. Fasteners are to be concealed by the subsequent overlapping unit.
Install I layer of #310 felt under the ridge pieces. Refer to the Ce13URTM Shakes Technical
Specification Details.
12 -inch -wide - Piece Bundle (optional)
Bundles of 12" CeDURTM Shakes are available as an accessory option to provide additional
pieces for valley/hip cuts. This accessory option helps to minimize waste and facilitate job site
production.
Snow Brackets (Optional)
Standard snow brackets should be considered in areas with high snow load requirements.
Metal Flashing
Roof flashing shall not be less than No. 26 gage (0.019 inches - .048 mm) corrosion resistant
sheet metal.
Sections of flashing shall have an end lap of not less than 4 inches (102 mm).
Single crown (W) valley flashing shall extend 11 inches (279 mm) from the centerline each
way. A 36" minimum width, high-temperature self -adhered polymer modified bitumen
membrane underlayment shall be installed in the valley prior to valley metal installation.
Reference Detail # 2 on page # 8 for the two acceptable methods of valley metal installation:
Stripped in edge flanges or Hemmed edges secured with metal clips and fasteners which do not
penetrate the valley flashing.
Chimney / Skylight / Side Wall - Step Flashing
Step flashing is to extend not less than 5" under the shakes and not less than 5" up the vertical
surface that the shakes butt up against. A moisture -resistant barrier is to be installed between
galvanized flashing and vertical surfaces. When chimneys, curbs, skylights, or any vertical
protrusion through the roof are at least 30" wide. saddles or crickets are required. These flashings
are to extend not less than 10" under the shakes. In areas with adverse weather conditions,
extended metal flashing lengths and / or a 36" wide layer of pressure sensitive polymer modified
bitumen flashing strip -in sheet are required.
Page 5
Update Effective October 12, 2017
Step flashing must be used where vertical surfaces occur in connection with slopes. Flashing is to
be formed of separate pieces, installed with each course of shakes, and lap no less than 3".
Counter -flashing is to be installed in a step manner to follow the joints of masonry and be
raggled into mortar joints / properly surface mounted.
Dormer Flashing
Dormer flashing shall run up not less than 6" under the shakes and a minimum of 5" up the
vertical interface. Windows, caps, and all other projections at points where rainwater
accumulates are to be protected with metal flashing. Metal flashing is to be extended up under
the shakes at the sidewalls and behind outside finish materials for a distance of at least 5". In
areas with adverse weather conditions, extended metal flashing height is recommended.
Pipe Flashing
All pipes projecting through roofs must have a deck flashing and be water proofed appropriately.
The flashing flanges are to extend out on the roof not less than 6". The flashing flanges are to be
of sufficient length to cover the shakes course below the pipe, and extend up under the butt of the
course above, as far as possible without being punctured by fasteners. Maintain a 1" (25.4 mm)
shakes clearance around the pipe projection.
Safety and Health
Occupational Safety and Hazard Administration (OSHA) prescribed safety standards, are to be
followed during product loading and installation; as well as and any subsequent roof traffic.
Product Dimensions
12114'
T�3/4",., 5
..,5114
12 1/4" Piece 7 1/4" Piece 5 1/4" Piece Starter
aa•
if F •,,.'`I
Hip & Ridge Low
Available Sizes & Installed Weight
34
Hip & Ridge Medium
Length
23
Width
''/a". 7 11//". 12 '/a'
Thickness
3/4" tapered to 1/8"
Installed Weight per 100 sq. fl.
170 lbs.
Pieces per Bundle
7 pieces each of 5
'/4". 7 ''/4". & 12 1/4"
shakes
Bundles per pallet
36
Hip & Ridge High
Coverage (based on 3/8" standard keyway)
10" Standard Exposure
SQ/Bundle 0.125
Pieces/SQ 168
SQ/8-Bundles 1
SQ/Pallet of 36 Bundle 4.5
Page 6
Update Effective October 12, 2017
CeDUR Diagrams — CeDUR installs in a similar fashion to Cedar Shakes
Use CeDUR material where Wood Shakes are referenced in the following drawings
(Used with permission from NRCA)
1.) Standard Field Lay -out Drawing
CeDUR Diacirarns -ry CeDUR installs in a similar fashion to Cedar Shakes
Use CeDUR materlal where wood shakes are referenced in the following drawings
.) Standard Field Lay -Out Drawing with int r me t
ave with water and ke-dam f b€ ction m mbraf e
Page 7
Update Effective October 12, 2017
2.) Valley Flashing Detail (Use either of the two options detailed below)
4*WkQNSR',0AUZf
MAL
wex
OPTION
VALLEY W -TA—'
;:MWATW MOM M-,
Zl� WCE SHEEr--uVri
VALLEY METALMOi R -.M*
PST P4 SSA,1A'W
4*WkQNSR',0AUZf
MAL
OPERVALLEY
WW0 SHK](C-14
3.) Cricket Flashing
SHE E I 44 -JAL COUN M PWLASttiN<�
STEP f-LA$40W, -430TH
stfks OF 041fANEY
j
X NN
1APINTERLAYMEN1
OVER FLASfING
C,'RJCW-T
f tASKING WTH HOA1,1EC)
(DCRI�llELFid HING AT MASONRY CHIMNEY LDGr----AX0tRtiff
SEA CXAWRIS
Page 8
wex
OPTION
OPERVALLEY
WW0 SHK](C-14
3.) Cricket Flashing
SHE E I 44 -JAL COUN M PWLASttiN<�
STEP f-LA$40W, -430TH
stfks OF 041fANEY
j
X NN
1APINTERLAYMEN1
OVER FLASfING
C,'RJCW-T
f tASKING WTH HOA1,1EC)
(DCRI�llELFid HING AT MASONRY CHIMNEY LDGr----AX0tRtiff
SEA CXAWRIS
Page 8
4.) Apron Flashing
SHEETACTAL _------ _.._.
COUNTERFLAS M,
X a�
h J
�F I
St$.FT-t<IFTAt. ATf:liN R.RE,ITM3L; Y3fYJtTSWixEfi '--&1EET-W rAL
th97i#HEl3h T7 E'O('�E SI (EL1+s 'w
g PRflN L.1 FWSHINr AT 11 S<jNRY 01111 EY
NOTES: Sintct �
). 7{%S CA•'.tAILAi"Fi IG1'*1AWV$iiF0.f FRE *IlTk:#.i3W:.�A YiA$'g.
T, Fmw-wkw4l L`d-<+kNEHY (lptyyay. ftm smir lE".-S +NIs (.C1r"31s,giAS4fitt} +il:y'4r+. VSiim m),*91V:;.Awx.,ti U4l #✓34YAt
AACV0ELTQk1% VEE�fi:P.?W_k6 C,,10Zrtil..T0,, CMffF L8XJRiS isEROsNihG
d -
PEFFATI)TWvZt om"To ui4' o3 CG?i:x At,CTKwi 'tatiSL1iA�'�TERf X1hSrt'iiT3�ih�.itEtaxxT:,T i.
CHIMNEY WITH CRICKET FLASHING
1192013 m i
<kwm-�-u sta;F 'YYdUi7 SHiC(C)-93
5.)Vent Pipe Flashing
V33iT tMfiDE PENS-MATSriti
N) " �...... � zbSiR:At:Ai} 5iSK Cj-'i2
Update Effective October 12, 2017
Page 9
6.) Sidewall Step Flashing
WALL Sr-MeO.-LA00W-5i -
W -IT $40 -NN ", CLAPM-f
Update Effective October 12, 2017
OC LAP V EP wL4ZOhs mN.
MMR.AYMWT AAO LwCERLAYW--N7
TU� LM WALL
5HVXr-*WrAL 6 1
CLX�',AT SACR
CoiRSE—VURMCIAL LSG
wt TC BE
TO ACC-CMACCATrz SAAKE
YXh. mr-k VIAT14N,;f, MC nno,"C,
INSIDEWALL FLASHING WITH TWU-PIECE COUNTERFLASHING
21113 NOT 01A ^ I -', ,�A, � WOOD SHr4C)-10
Page 10
7.) Curb Mounted Skylight Flashing
' f+t t .�+tr::'t ,n �3x.•=¥ K3 ut�:x H .< 1�-.ter,;:,
A �4'4A;��Y7iF �yy'3�yf ygayyy'lP++IIy�yy"OUAAFffA-yi°@T��yyr't)t,9PYy, T?�jti;.3�y,�td'?i �1 (�A.:✓�i�I�Aa:: iyrKf-42,sT�'$y
20 WOOD
Update Effective October 12, 2017
Page 11
8.) Headwall Flashing
TWQ-�PIS--e &--&Zr-kIS-AL
1:i -'W
0*4SRLAP
S�eET4-*TAL FIMII MA,
wrrH MEWAE—D C-�Se
EXTEND qSwJED
EDOE 10 C~AA
C*R MIK A'
A100C, sf-W.Es "I
IN-SqIIAYMSfa.
VftC-ZRLA'YVSMT
EI
0
Update Effective October 12, 2017
W.44--- SfDjftr-�f%S
NSI;7 S�IOAN IMI -P aL*J;"-y
GULnFfII4G'NW LAMM
AP? PaKlm
FAS'S'AaRs
T�" �C, Am — 7,
InHEADWALL FLASIMMG
17013 W,nr UM A A -N ICA x 94 K, WOOD SHK(C)-9.
Page 12
AND
Tg11 A.sEG tip AM"
I
T�" �C, Am — 7,
InHEADWALL FLASIMMG
17013 W,nr UM A A -N ICA x 94 K, WOOD SHK(C)-9.
Page 12
Lagenia Reimer
From:
no-reply@ci.wheatridge.co.us
Sent:
Wednesday, April 25, 2018 12:01 PM
To:
CommDev Permits
Subject:
Online Form Submittal: Residential Roofing Permit Application
Categories:
Gina
�o
Residential Roofing Permit Application
J
This application is exclusively for new permits for residential roofs and for licensed
contractors only. This type of permit is ONLY being processed online --do not come
—�
to City Hall to submit an application in person. Permits are processed and issued in
the order they are received and due to the volume of requests, time to process
varies and is subject to change. YOU WILL BE CONTACTED WHEN YOUR
PERMIT IS READY FOR PICK-UP AND WILL BE GIVEN A SPECIFIC DATE
AND TIME WINDOW TO COMPLETE THE TRANSACTION. You will be notified if
your contractor's license or insurance has expired, and you may update those
documents at the time you are issued your permit.
For all other requests:
Homeowners wishing to obtain a roofing permit must apply for the permit in person
at City Hall. Revisions to existing permits (for example, to add redecking) must be
completed in person at City Hall. All other non -roofing permits must be completed in
person at City Hall. The Building Division will be open from 7:30-10:30 a.m.,
Monday through Friday to process these types of requests.
THIS APPLICATION DOES NOT CONSTITUTE A PERMIT. DO NOT BEGIN
REROOFING UNTIL PERMIT HAS BEEN ISSUED.
Is this application for a Yes
residential roof?
How many dwelling units Single Family Home
are on the property?
PROPERTY INFORMATION
Property Address
Property Owner Name
Property Owner Phone
Number (enter WITH
dashes, eg 303-123-4567)
3920 Reed Street
Joe Custodil
970-250-5727
Property Owner Email Field not completed.
Address
Do you have a signed Yes
contract to reroof this
property?
Applications cannot be
submitted without an
executed contract
attached below.
Attach Copy of Executed IMG 0859.JPG
Contract
CONTRACTOR INFORMATION
Contractor Business Band -Timm
Name
Contractor's License 170212
Number (This is a 5 or 6
digit number for the City
of Wheat Ridge)
Contractor Phone 303-218-6655
Number (enter WITH
dashes, eg 303-123-4567)
Contractor Address 10210 Progress Lane Parker, Colorado 80134
(Primary address of your
business)
Contractor Email Address info@roofingmadesimple.com
Retype Contractor Email info@roofingmadesimple.com
Address
DESCRIPTION OF WORK
TOTAL SQUARES of 11
the entire scope of work:
Project Value (contract 10,000
value or cost of ALL
materials and labor)
Are you re -decking the No
roof?
Is the permit for a flat Pitched roof (2:12 pitch or greater)
roof, pitched roof, or
2
both? (check all that
apply)
What is the specific pitch
of the PITCHED roof?
How many squares are
part of the PITCHED
roof?
Describe the roofing
materials for the
PITCHED roof:
Type of material for the
PITCHED roof:
If "Other" is selected
above, describe here:
Provide any additional
detail here on the
description of work. (Is
this for a house or
garage? Etc)
6/12
11
Cedur Synthetic Roofing Shakes
Other
House
Complete Re Roof
SIGNATURE OF UNDERSTANDING AND AGREEMENT
I assume full
responsibility for
compliance with
applicable City of Wheat
Ridge codes and
ordinances for work
under any permit
issued based on this
application.
I understand that this
application is NOT a
permit. I understand I will
be contacted by the City
to pay for and pick up the
permit for this property.
I understand that work
may not begin on this
property until a permit
has been issued and
posted on the property.
Yes
Yes
Yes
3
I certify that I have been Yes
authorized by the legal
owner of the property to
submit this application
and to perform the work
described above.
I attest that everything Yes
stated in this application
is true and correct and
that falsifying
information in this
application is an act of
fraud and may be
punishable by fine,
imprisonment, or both.
Name of Applicant Zac Bandy
Email not displaying correctly? View it in your browser.
FOR OFFICE USE ONLY
City of trate:
?�?7Wh6at id le
COMMUNiTy DEVEl.0PTCNT__"ggPtawper aaft #
Building & Inspection Services Division S q L�,
7500 W. 29 Ave., Wheat Ridge, CO, 80033 Mara Review
Office, 303-235-2855 * Fax. 303-237-8929
Inspection Lina. 303-234.5933
Building er it Application
Property Address.- 2-a ac� �
Props, ty Owner (please print). o d i o Phone: S2.,.. 7
Property Owner Smell.- -I',504
Mailing Address: (if different than property address)
Address: S
Cit State, Zip:
Arch tectlEngin r E-mail.- Phone.-
Contractor:
!ho xContr i ter:
Contractors City License phone. la -4 01
Contractor E-mail Address: 42
Sulo Contractors-.
Electrical: Plumbing: Mechanical:
W.R. City License # W.R.City License # W.R. City License ##
Other City Licensed Sub: Other City Licensed Sub.
City License At City License ##
Complete all information on BOTH sides of this form
lr g � • s ,�
0 NEW COMMERCIAL STRUCTURE
OTHER ELECTRICAL SERVICE UPGRADE
NEW RESIDENTIAL STRUCTURE COMMERCIAL ROOFING
COMMERCIAL ADDITION RESIDENTIAL ROOFING
RESDENTIAL ADDITION WINDOW REPLACEMENT
COMMERCIAL ACCESSORY STRUCTURE (Garage, shed, deck, etc.)
RESIDENTIAL CESSORY STRUCTURE (Garage, shed, deck, etc.)
MECHANICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
PLUMBING SYSTF-MiAOPLIANCE REPAIR or REPLACMENT
ELECTRICAL SYSTEM/APPLIANCE REPAIR or REPLACEMENT
(Describe),
Sq, FULF Stu's Gallons
Amps Squares Other
INSPECTION RECORD Occupancy/Type
INSPECTION LINE: (303) 234 -5933
Inspections will not be made unless this card is posted on the building site
Call by 3:00 PM to receive inspection the following business day.
h l / /'
I v4 v 6—Llu UUYV
INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB J
FOUNDATION INSPECTIONS
DATE
INSPECTOR.
INITIALS
COMMENTS:
Footings /Caissons
Stemwall / (CEG) Concrete
Encased Ground
Reinforcing or Monolithic
Weatherproof/ French Drain
Sewer Service Lines
Water Service Lines
INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS
SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS.
YUUK NO I QNURETE UNTIL ABOVE HAS BEEN SIGNED
CONCRETE SLAB FLOOR
Electrical (Underground) -
Plumbing (Underground)
ROUGHS
Lath / Wall tie
Mid -Roof
Electrical Service
Rough Electric
Gas Piping
Rough Mechanical
Framing
Insulation
Drywall Screw
INSPECTIONS
- FINALS
Electrical
Plumbing
Mechanical
Roof
Building Final
Fire Department
R.O.W & Drainage
INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLICE WORKS
SHOULD BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS.
Parking & Landscaping
"NOTE: ALL ITEMS MUST BE COMPLETED AND APPROVED BY PLANNING AND ZONING, BUILDING AND PUBLIC WORKS BEFORE A
CERTIFICATE OF OCCUPANCY IS ISSUED. FINAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTEAUTHORIZATION
OF A CERTIFICATE OF OCCUPANCY NOR PERMISSION FOR OCCUPANCY.
e.
OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF OCCUPANCY IS ISSUED
PROTECT THIS CARD FROM THE WEATHER
c,
` 4
CITY OF WHEAT RIDGE
00 Building Inspection Division
(303) 234 -5933 Inspection line
(303) 235 -2855 Office ' (303) 237- -8929 Fax
INSPECTION NOTICE
Inspection Type 45 , WQ
Job Address 3?Xg AOso sa°
Permit Number le .
xL
F.
o No one available for inspection: Time PM
Re- Inspection required: Yes
When corrections have been made, call for re- inspection at 303- 234 -5933
Date: Inspector:
DO NOT REMOVE THIS NOTICE
" 4' City of Wheat Ridge
.�
Residential Electric PERMIT - 102350
PERMIT NO: 102350
ISSUED: 10/11/2010
JOB ADDRESS: 3920 REED ST
EXPIRES: 10/11/2011
DESCRIPTION: 200 amp service change
-- * ** CONTACTS * **
owner 303/341 -8712 Joe Costanco
sub 720/219 -1383 Scott Berkman
08 -0190 Current Installations LLC
** PARCEL INFO **
ZONE CODE: UA
USE: UA
SUBDIVISION: 0363
BLOCK /LOT #: 0/
** FEE SUMMARY **
ESTIMATED
PROJECT VALUATION: 2,250.00
FEES
Permit Fee
93.35
Total Valuation
.00
Use Tax
40.50
** TOTAL **
133.85
Conditions:
Must comply w/ 2006 IRC & 2005 NEC.
Subject to field inspections.
I hereby certify tha the setback distances proposed by this permit application are accurate, and do not violate applicable
ordinances, rules 5f regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all
measurements show/, and allegations made are accurate; that I have read and agree to abide by all conditions printed on this
application a hat I assume full responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other
applicabl t 'dge Ord i es, for work under i permit. Plans subject to field inspection.
-
Signature o contractor /owner date
1. This permit was issued in accordance with the provisions set forth in your application and is subject to the laws of the
State. of Colorado and to the Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable
ordinances of the City.
2. This permit shall expire 180 days from the issue date. Requests for an extension must be received prior to expiration
date. An extension may be granted at the discretion of the Building Official.
3. If this permit expires, a new permit may be acquired for a fee of one -half the amount normally required, provided no
changes have been or will be made in the original plans and specifications and any suspension or abandonment has not
exceeded one (1) year. If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall
be paid for a new permit.
4. No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
S. Contractor shall notify the Building Inspector twenty -four (24) hours in advance for all inspections and shall receive
written approval on inspection card before proceeding with successive phases of the job.
6. The issuance of a permit or the approval of drawings and specifications shall not be construed to be a permit for, nor
an approval of y violation of the provisions of the building codes or any other ordinance, law, rule or regulation.
All p is subject to field inspections.
Signatur of ief Building Official date
INSPE TION REQUEST LINE: (303)234 -5933 BUILDING OFFICE: (303)235 -2855
REQUESTS MUST BE MADE BY 3PM ANY BUSINESS DAY FOR INSPECTION THE FOLLOWING BUSINESS DAY.
c ilk ui
�Stl,t.71
iltaf7 k
Building 8: Inspection Services Division Permit
7500 W. 29 Ave., Wheat Ridge, CO 80033
Office: 303- 235 -2855 * Fax` 303- 237 -8929
Inspection Line: 303 -234 -5933
(q Building Permit Application
7'Toperty Adtlg:ess:
Property Owner (please print):_ - oe- /�O, 4 *'i Ly __ _Pho 303
Mailing Address: (if different than property address)
Address:
City, State, Zip:
Crinitractar: �u f /c«. � Kf f «��sc,� D r �L 7 - -- - —
Contractors City License #: Phone: 72.6
Sub)Go »�racfi®rs --.
Electrical: Plumbing: Mechanical:
City License # City License # City License #
pesc 633 i fiw h(�± awlC
CA_ 0.442 C. , " Contract Value:
J (fir 0�_�
2Z70,4 M p
Review Fee (due . at time of submittal):
Squares BTU's Gallons Amps DO Sq Ft. $
O WNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit . application are accurate and do not violate applicable ordinances,
roles or regulations of the City . of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown and
allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full
responsibility for compliance with applicable City of Wheat Ridge codes and ordinances for work under any permit issued based on
this application; that I am the legal owner . or have been authorized by the legal owner of the property to perform the described work
and am also authorized by the legal owner of any entity included on this application to list that entity on this application.
CIRCLE ONE: (OWNER)) (C CT or (AUTHORIZED REPRESENTAT of ER) (CONTRACTO -
PRINT NAME: �� r ` �M ®^ SIGNATURE: DATE:
ONING COMF�i ENTS � � ? r� i� �, ° � � � � . � ✓ " �- � � < - L
,. � 1" ✓ < s. < ,,.' s .r /v r ✓' ? � x }^J"! ✓/ G u / `'v? w^ +} r it �'
r r .�011)It,� ✓ 5 ': `� ". �,- } y - }' f fT �, G ?✓•.�{.,- �1r✓ ? �xss ✓ ci �'��✓ fl t'aS'� "H�`/ =
i ✓,+,. r,s x � r z r rr j t -^'. � 3 ss �i s t ar x/ {�'; ✓� � � ���,� � r }{ s r r ? t �? sr^r .
t .1 s v�/ � � r � �� R +� } 1 /-r ? .<�a � �yis'�"�#'"'''r Y ✓�` ;S�w 2u ,�k`ei c E g
r 13e fewer ?r sS r F 5 i v, rl ✓ cr ?� _! � y -� ✓ h.�-r
t % s'fiF.. K�Yr �/' �G 3a�? � ..l Y !�, Z f'.l�'>%('l ` 3 `. : , � ✓N ,� J. a-- � /y � l C F�
l' ✓n 4 i r c r r"b a �`" r � t✓ �� � Y �'" w�,,r9�y u5 .��
I I J � � J ,,. � � ✓ fie. � �• ✓��1����t °'f�rUyU / ,W ✓:+�V"�'r ���) %
Y : ✓ i ✓ t ? ✓. J / �✓ y�s,lu < � S ,-ri ✓ r;'� w c Ci � � "�G y'u.r`e^"^ } 4ry r F E,
- .✓., .u;:_,�. ... �/✓i ,r.,,. , <.r .. ✓, % -.. os., N,br - � .�,a.:+r� �/c r�C- :.�n'.a�erb...✓� �sr"�.�'sd° 67+' �". �;; ...;c:",�.r
1 �.,. kr a,�. ✓, F.Y_,� �' }�., ✓s .. 4 i, x .. � i._ r.. Sw_ #+a ..ya✓ . ✓1;., .. ,,,viml
FIRE DEPARTMENT ❑ apprflvedw7gomm6u4s ❑ dlsapprgved, Q no7a�ew teq�ired Dldg Valuation $ LudU • u U
ct of
v
heat idg�
-- ' DEVELOPMENT
Building & Inspection Services Division
7500 W. 29" Ave., Wheat Ridge, CO 80033
Office: 303 - 235 -2855 * Fax: 303 - 237 -8929
Inspection Line: 303 - 234 -5933
Building ( Permit Application t
Property Ad'dr_ess: 7 Zc� '�C'�X } 4
Property Owner (please print): r J' }t� Phone: ��? -•��j5 %j;
Mailing Address: (if different than property address)
Address:
City, State, Zip: (I
Contractor:
Contractors City License #: Phone:
4"C404400*
0*
Electrical: Plumbing: Mechanical:
City License # City License# City License #
De §r;nlafio:ro �f work
�t c r t� (iJCr� 5 t v c Ld
Contract Value:
$ `0. a "M
Review Fee (due at time of submittal):
Squares —Li— BTU's Gallons Amps Sq Ft. $
OWNER/CONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate and do not violate applicable ordinances,
rules or regulations of the City of Wheat Ridge or covenants; easements or restrictions of records that all measurements shown and
allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume full
.responsibility for compliance with applicable City of Wheat Ridge . codes and ordinances for work under any permit issued based on
this application; that I am the legal owner or have been authorized by the legal owner of the property to perform the described work
and am also authorized by the legal owner of any entity included on this application to list that entity . on this application.
CIRCLEONE (OWNER) (CONT or (AUTHORIZED REPRESENTATIVO (O ) (CONTRACTOR)
PRINT NAME: AU C Vf L� SIGNATURE: f / DATE: 7 —20 - I
✓` r `DEPA��2TMEMTUSF01�1 -Y ' ' U � r�
ZONING COMMENT$ 'c r � r r -� -` ''C" 5 ,�,�, r r ����- �%x � ✓�� � r �
✓ �Ze�t Ip� ��x / ✓rl r rY � J. ^j '^" lx ✓ s,5"'`�' �C`� c-� '�s'"s, ✓. > ✓ �, � f / r ✓ 1{
y RBVJOwej' '` ✓ ✓ of ✓"'' i ✓r ✓ r �✓ S � a i f � ✓ ✓ � ✓ � s�rk✓r
✓�✓ 5 i ��� � l � S Y ✓✓ f c rGr ✓q �+1! r�� Z tvi � a e r/✓'�'��
�UILD)NG DEP/�RTNIENT GOMYy1E�T?S ✓ 2a` r � ✓, ✓ `, y I �✓ � G� � ,/" �` � � `�� ✓ -
'� ✓RSYleSI'er' r'✓ ✓ ,' /r, G r ? ✓ r >v C
✓e ✓ l ✓ �'+j�o�i� �� - ice rr ✓"y r'E( ✓
a r �✓r ✓ f �{ �✓', r, ✓ / . x a ✓ i slr � / 'w � 9 s
r PUB11C WORKS CQIU7MRNT5 % � z � � ' `� ✓ i ra � r � :-� -✓ ,yp�CCl1PA1�111�Y -
.ReVi ✓ ✓i r y � ����,,,� ✓ , ? r ,' rr
Y
✓ JYREbEPARTMEN7; D approved v✓/ com�pej7ts D disapproved ❑ ijo re`�uiev/ regiured Bldg Valuation $
a s CITY OF WHEAT RIDGE
Building Inspection Division
(303) 234 -5933 Inspection line
3?
( 303) 235 -2855 Office • (303) 237 -8929 Fax
INSPECTION NOTICE
Inspection Type: �ttl.�G QG=
Job Address: 92 c 7'
Permit Number: 1,9 11 VS
❑ No one available for inspection: Time AM PM
Re- Inspection required: Yes No
" When corrections have been made, caff for re- inspection at 303-234-5933
Date: O Inspector
DO NOT REMOVE THIS NOTICE
♦ i CITY OF WHEAT RIDGE
Building Inspection Division
�r (303) 234 -5933 Inspection line
(303) 235 -2855 Office • (303) 237-8929 Fax
INSPECTION NOTICE
Inspection Type: f�
Job Address >y, L
Permit Number: Number: /n ( 1'2� 9
❑ No one available for inspection: Time i 5 AM/PM
Re- Inspection required: Yes No
When corrections have been made, call for re inspection at 303 - 234 - 5933
Date: Inspector: x
DO NOT REMOVE THIS NOTICE
t,
INSPECTION RECORD
Occupancy/Type
Y,
®'INSPECTION LINE: (303) 234 -5933
Inspections will not be made unless this card is posted on the building site
w Call by 3:00 PM to receive inspection the following business day.
INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB
FOUNDATION. INSPECTIONS ':.
.DATE
INSPECTOR '
INITIALS
COMMENTS:
- .Footings /Caissons.
Stemwall I (CEG) Concrete. -
Encased Ground '.
Reinforcing or Monolithic
-
-
WeatherproofIFrenchDrain
- -.
Sewer Service Lines
Water Service Lines
INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLIC WORKS SHOULD
BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS.
ROUGHS
Sheathing
Lath V\ a I ne
Mid -Roof
Electrical Service
Rough . Electric
Rough: Plumbing
Gas Piping
Rough Mechanical
ABOVE INSPECTIONS TO BE SIGNED PRIOR TO PROCEEDING
Framing
Insulation
Drywall Screw I
FINALS
.Electrical
'
Plumbing
Mechanical
Roof
Building Final
Fire Department
R.O. W & Drainage '.
INSPECTIONS FOR PLANNING & ZONING, FIRE AND PUBLIC WORKS SHOULD
BE CALLED AT LEAST ONE WEEK PRIOR TO FINAL INSPECTIONS.
Parking & Landscaping
_
"NOTE: ALL ITEMS MUST BE. COMPLETED AND APPROVED BY PLANNING AND ZONING, . BUILDING AND PUBLIC .WORKS BEFORE A
CERTIFICATE OF OCCUPANCY IS ISSUED.'FINAL INSPECTION BY THE BUILDING DIVISION DOES NOT CONSTITUTE AUTHORIZATION '
OF A CERTIFICATE OF OCCUPANCY. NOR PERMISSION FOR OCCUPANCY..
OCCUPANCY NOT PERMITTED UNTIL CERTIFICATE OF OCCUPANCY IS ISSUED
PROTECT THIS CARD FROM THE WEATHER
City of Wheat Ridge
PERMIT NO: 101148
JOB ADDRESS: 3920 REED ST
a - DESCRIPTION: Reroof 14 sqs and redeck
Fee 1
fee,additiona
Valuation
Lx
x additional
SAL x x.: 2
�cblw - ) , �l-�'�
6 ��
De
IN CTION REQUEST LINE: (303)234 -5933 BUILDING OFFICE:: (303)235 -2855'
78.00
De
IN CTION REQUEST LINE: (303)234 -5933 BUILDING OFFICE:: (303)235 -2855'
City of Wheat Ridge
sidential Roofing PERMIT - 101148
ISSUED: 05/05/2010
ED ST EXPIRES: 11/01/2010
'RIPTION: Reroof 14 sqs
CONTACTS
)wner 303/467-1579, Joe Custodio
, ub
303/458-0727 Derek Hendricks 06-0033 Brickey Construction
PARCEL INFO
;ONE:. CODE: UA USE: UA
3UBDIVISION: 0363 BLOCK/LOT#: 0/
FEE SUMMARY ESTIMATED PROJECT VALUATION: 2,478.00
1 FEES
Permit Fee 108.30
Total Valuation .00
Use Tax 44 60 7
** TOTAL 152'90 " V11
'onditions;
nails per shingle is required. Ice dam membrane is required from eave edge to
inside exterior walls. Board sheathing with any gap greater than 1/2
. panel sheathing overlay on entire roof. Sheathing inspection is
. prior to covering. Midroof inspection is not required on permits
)urchased after 4/18/10. Contractor shall provide ladder for inspections.
;cheduled inspections that cannot be performed due to inclement weather must be
:ancelled prior to 8:30 a.m. on the day of inspection or a re-inspection fee
Till be assessed.
I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable
ordinances, rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record,a that all
measurements shown, and allegations made are accurate that I have read and agree to abide by all conditions printed on this
application and that I assume full,responsihility for compliance with the Wheat Ridge Building Code (I.B.C) and all other
applicable at R'�ces, for work under this permit. Plans subject to field inspection.
S1 . 1, . o
Signature of contractor /owner date
This permit was issued in accordance with the provisions set forth in your application and is subject to the laws of the
State of Colorado and to the Zoning Regulations and Building Codes of Wheat Ridge, Colorado or any other applicable
ordinances of the City.
This permit shall expire 180 days from the issue date. Requests for an extension must be received prior to expiration
date. An extension may be granted at the discretion of the Building official.
It this permit expires, :a new permit may be acquired for a fee of one-half the amount normally required, provided no
changes have been or will be made in the original plane Viand specifications and any suspension or abandonment has not
exceeded one (1) year If changes have been or if suspension or abandonment exceeds one (1) year, full fees shall
be paid for a new permit.
No work of any manner shall be done that will change the natural flow of water causing a drainage problem.
Contractor shall notify the Building Inspector twenty-four (24) hours in advance for all inspections and shall receive
written approval on inspection card before proceeding with successive phases of the job.
The issuance of a permit or the approval of drawings and specifications shall not be construed to be a permit for, nor
an lapproval of ' P y violation of the provisions of the building codes or any other ordinance, law, rule or regulation.
All plan Acv/pwsubject to field inspections.
05/05/2010 16:30 FAX 303 973505 8 BRICKY CONSTRUCTION Q003/003
IL A P
City of
C Y n'YD �Theat i e Date
Cn r�orn�Nr Permit #:
Building Division
7500 W. 29 Ave., Wheat Ridge, CO 80033
Office: 303- 235 - 2855' Fax: 303- 237 -8929
Inspection Line: 303- 234 -5933
Facsimile Building Permit Application
NNOMEMM �; s w
Property Owner (please print) Phone: g - i 4 1 - 1S
Mailing Address: (if different than property address)
Address:
City, State, Zip:
Contractor License #: f)laO033 Phone: Sa-2, - LiSB - D7 z I
on! any Name License #• Expiration Date: Trade/Profession: Approval:
U Of S ace description):
Construction Value: I
_lz pi cv,. I s to `� Plan Review (due at time ofsulNrrittap: S
�. art In yPrS
Sq. Ft. /L.Ft added: Squares 1� BTU's Gallons Amps
OWNERICONTRACTOR SIGNATURE OF UNDERSTANDING AND AGREEMENT
I hereby certify that the setback distances proposed by this permit application are accurate, and do not violate applicable ordinances,
rules or regulations of the City of Wheat Ridge or covenants, easements or restrictions of record; that all measurements shown, and
allegations made are accurate; that I have read and agree to abide by all conditions printed on this application and that I assume fug
responsibility for compliance with the Wheat Ridge Building Code (I.B.C) and all other applicable Wheat Ridge Ordinances, for work
under this permit. Plans subject to field Inspection.
CIRLCEONE: (OWNER) (CONTRACTOR) � := REPRFSE T 1 R) ( CONTRATOR)
PWNT NAME; tl, .J, �rn RE: !� �� — a
Bldg Valuation:
Credit Card Payment: Use credit card listed on file.
Print name: 1 &yvsy 41 ��__ Signature:
DEPARTMENT OF GOMMUNITY DEVELOPMENT
7500 WEST 29th AVENUE BUILDING INSPECTION DIVISION PERMIT N0. Mp94#3960
234-5933 P.O. BOX638 CITY OF WHEAT RIDGE, COLO.
THIS PERMIT VALID ONLY WHEN SIGNED BY ThiE CHIEF BUILDING INSPECTOR AND RECEIPTED BEL'JW.
1kU
3Q
r~rru~.ni ~viv vn nua~.o~~n~vcv~a r~nnau i
/I
C
/
~
I
JOBADDRESS
.
t
,
e~
1
iP
OWNER llOr
CONTRACTOR
ONt
!4 /~A`/
r-
nHl?Q
ADDRESS 39~a f~2'f 57~W~~A+~i(~~-1'P.
ADDRESS I
WO31
v46 ti
-PHONE ZIPCODE
CITY DKoO
/I1 'P"v f
I
J C!J
ZIp CODE gd 0 2U
CONTRACT PRICE $j 100. !T~
PHONE ya
`l -Q 7
Y9
LICENSE NO
DATE
.
1. TYPE Ground ❑ Woll❑ ProieclinQ❑ Ofhsr S or D Foes_
SIGN$
2. MATERIAL
ILLUMINATION Yea❑ No❑
3
Type
. Tofal Squoro Feet
Eieet
Parmif No.
.
4. SET BACK FROM PROPERTY LINE N
(Specify which is front)
_ S_ E
❑ ❑
-
❑
.
W Zone_ ADDrwad,ZOne Inspsotor
❑ DisapDrwed
1. TYPE Solid❑ More Thon 80°/a Openo
MATERIAL
Ls
sa Than 80% Open
HsiphT
FENCES
3. SET BACK FROM PROPERTY LINE N
(Specity whieA ie tronf)
_ S_ E
❑ ❑
_
❑
W Zons_ ADVrwW,Zone Inspaeta
❑ -0iaapproved
L
2
1
OTHER
3.
DRAW SKETCH OR SHOW BEIOW, THE FENCE,SIGN,OR OTHER STRUCTURE, GIViNu DISTANCES FROM PROPERTY LINES.
(SETBACNS OR PROJECTIONS INCLUDED) ~
SPECIFY NORTH
STREET NAME
SHOW DISTANCES FROM THE MAIN BUILDING TOADJOINING HOUSES, STREETS, AND PROPERTY LtNES;ON IRREGULAR IATS, SHOW LEAS7
DISTANCE TO PROPERTY LINES, NOT MAXIMUM OR AVERAGE DISTANCE.
APPLICATION FOR PLUMBING; ELECTRICAL; MECHANICAL PERMIT
THIS APPLICATION WILL BECOMEA PERMITTO PERFORM THE INDICATED WORK ONLY UPON VALIDATION BYTHE BUIIDING INSPECTION DIVISION.
PERMIT WILL EXPIRE 180 DAYS FfiOM THE DATE OF ISSUANCE IF WOfiK IS N0T STARTEO WITHIN THAT TIME.
ELECTRICAL PERMIT
STATE LICENSE N0.
PLUMBING PERMIT
STATE LICENSE N0.
MECHANICAL PERMIT
ALUMINUM WIRE UNDER $RE 8 ILLEGAL
FLOOR
BSM
I5T
2ND
3RD
4TH
N0.
FUELCiiclaOne Gai dl Propone Cod Elx Solar
Np,
WATER CLASET
FORCED AIR - BTU
TEMPORARY METER
WASH BOWL
HOT WATER - BTU
NEW SERVICE AMPS ~
BATH TUB
STEAM - BTU
CHANGE SERVICE-AMPS
SHOWER
AIR CONDiT10NINCa-BTU
IIGHTING
SINK
OTHER
HEATING
GARBAGE DISP
REFRIGERATION SYSTEM
POWER SUB-GFCUITS
WATER HEATER
Refri eront Group
UTILITY (RANGE, DISPOSER, ETC.)
AUTO.WASHER
FIXTURES
DISH WASHER
AUTOMATIC SPRINKLER SYSTEM
WIRING MOTORS B CONTROLS
FIDOR DRAIN
EL TOR
SIGNS
URINAL
S t
TRANSFORMERS 9 RECTFIERS
SEWERS
ADDITION TO OLD WORK
OTHER
MOTORS OVER I HP
TOTAL FIXTURES
I hereby acknowledqe thot this apDlico-
fion is eorrect ond understand thot I
eannot ttart thie projetf until thia oppli-
cotion it op0roved. I sholl comply with
ihe lowa of 1he Stote of Colorodo and to
}he Zoninp Requlotions ond Buildinq
Code ofthe City of Wheat Ridqe. Qny
violotion of the above ferms will cause
immediate revoeafion of this permH
PERMIT FEE ~f NOT VALID UNIESS RECEIPTED
USE TAX ~~F6f4
? ~Q
TOTAL FEE $
T-_ n~a r f A4
CHIEF BUILDIN~i11NSPECTOR,City of Cyheat Rid9e
V
CALL2345933
r~ 24 HOURS IN ADVANCE
Date Issued POR INSPECTIONS
AooJjeantf sior.wr.
BUILDING DEPARTMENT ; INSPECTION TICKET
237-6944 Ext. 255 JpB (l/
. . ADDRESS CITY OF WHEAT RIDGE ~
• r
Correction Notice
Job Located at ~..~7.~..~~...U......... ~.G
I have this day inspected this structure and these premises and
have tound the following violations of City and/or State laws
governing same:
...:.....8.o..h-:"i .~~......,~~...~.7.i
..........y.u -'L. k
.
.
You are hereby notified to correct tHe foregoing violations.
When corrections have been made, call for inspection.
i
C
Date.... .:~..J... c~ :..7.. ~ ~c.-,. _
.
' •i......... Inspector for Building Dept.
DO NOT REMOVE THIS TAG
'F. FONM WP6'33 ~
1 . . . . . . .
s
DATE: BLDG~PE MIT#~~~I7
BLDG. CONTR.
PERMIT#
SUBCONTRACTOR -r r?l DATE INSP. REQ.~ ~
TYPE OF INSP. ~ ~--'LO
INSPECTION MADE "
REMARKS 0 'S
(trN 6-It'-17 t v-t-l
W.R. FORM 6-19 /
INSPECTION TICKET
doa
ADDRESS 2 C~ eQe-T-CZ 5 f'
93 ~5~17
DATE: BLDG. PERMITN _
PERMITN
~
BLDG. CONTR. ^ ~ a SUBCONTRACTOR
DATE INSP. REQ. ~ a a
TYPE OF INSP. ! - [ J •
INSPECTION MADE f-2`3
REMARKS a \
W.R. FORM 6
DE^ARTrricNT OF COiv1MUiVi I Y D€VELOPMENT Mg
7500 weST 29tn AvENUE BUILDING INSPECTION DIVISION PERMIT N0. 15#93#5547
237-6944 ExT. 255 P.O. BOX 638 CITY OF WHEAT.RIDGE, COLO.
THIS PERMIT VAUD ONIY WHEN SIGNED BY TNE CHIEF BUILDING INSPECTOR AND RECEIPTED BELOW.
APPLICATION FOR MISCELLANEOUS PERMIT
JOBADDRESS 39z0 REED 5T_ I OWNER Martha Ku¢ler
CONTRACTOR DICKS ELECTRIC CQ,_.___,_
Aooaess 5708 W.38th Ave
CITY (Mlg) DENVER ZIPCODE80212-7125
PHONE 424-9284 LICENSE NO. 517
ADDRESS .3920 REED ST _
PHONE 424-3545 ZIPCODE80033
CoNTRACT PRICE $950. 00
DATE Aueust 20 1993
TYPE Ground ❑
1
Woll❑
Proiecfinq❑
01her
S or O Foce
SIGNS
.
2. MATERIAL
I
MINATION Y
❑ N
L
❑
T
e
Total Squara Feet
Elact
Permit No
.
ee
o
3.
U
L
4. SET BACK FROM PROPERTY LINE N
(SOecify which is froni)
yp
_
❑
S_ E
❑
_ W
❑ ❑
.
Zone_
.
Apprwad, Zone Inspeetor
DisapDrwed
1. TYPE Solid❑ More Than 80% Open❑
?
MATERIAL
Lass Than 80% Open
Hsight
FENCES
.
3. SET BACK FROM PROPERTY LINE N
(SOecify whieh iafront)
_
❑
S_ E
❑
_ W
❑ ❑
Zcne_
Approved,Zone Inspeeta
Disopproved
I
.
2
OTHER
a
.
DRAW SKETCH OF2 SHOW BELOW, THE FENCE,SIGN,OR OTHER STRUCTURE, GIVIhG DISTANCES FROM PROPERTY LINES.
(SETBACKS OR PROJECTIONS INCLUDED)
~
SPECIFY NORTH
STREET NAME
SHOW DISTANCE$ FROM THE MAIN BUILDING TOADJOINING HOUSES,STREETS, APlD PROPERTY LINI IRREGULAR LOTS,SHOW LEAST
DISTANCE TO PROPERTY LINES,NOT MA%IMUM OR AVERAGE DISTANCE.
APPLICATION FOR PLUMBING; ELECTRICAL; MECHANICAL PERMIT
THIS APPLICATION WILL BECOME A PERMIT TO PERFORM THE INDICATED WORK ONLY UPON VALIDATION BY THE BUILDING INSPECTION DIVISION.
PERMIT WILL EXPIRE 780 OAYS FROM THE DATE OF ISSUANCE If WORK IS NOT STARTED WITHIN THAT TIME.
ELECTRICAL PERMIT
STATE LICENSE N0. 627
PLUMBING PERMIT
STATE LICENSE N0.
MECHANICAL PERMIT
ALUMINUMWIREUNDERSIZE8ILLEGAL
FLOOR
BSM
IST
2ND
3RD
4TH
N0.
FlffL:Ci1UeOneGo6q1PropnneLoolElxS0lor
Np,
WATER CIASET
FORCEO AIR - BTU
TEMPORARY METER
WASH BOWL
HOT WATER - BTU
NEW SERVICE - AMPS
BA1H TUB
STEAM - 8TU
1
CHANGE SERVICE-AMPS lOO
SHOWER
AIR CONOITIONING-BN
L16HTING
SINK
OTHER
HEATING
GARBAGE DISF
REFRIGERATION SYSTEM
POWER SUB-CIFCUITS
WATER HEATER
Reiri erant Group
4
UTILI7Y(RANGE,DISPO5ER,ETCJ
AUTO. WASHER
Pounds Char e
FIXTURES
DISH WASHER
AUTOMATIC SPRINKLER SYSTEM
WIRING MOTORS 8 CONTROLS
FIDOR DRAIN
EIEVATOR
SIGNS
URINAL
TRANSFORMERS 9 RECTFIERS
SEWERS
ADDITION TO OLD WORK
OTHER
MOTORS OVER I HP
TOTAL FIXTURES
REMARKS
I hereby ocknowledga thot this appllca-
fion is Correct and understand thot I
connof stort this projbct unfil this appli-
cotion is approved. I sholl comply wifh
the lawe of ihe Stote of Colorado and to
fhe ZoninQ Repulations and BuiidinQ
Code ofthe City of Wheat Ridqe. Any
violation of the above terma wili causa
immediate revocotion of this permit
PERMIT FEE 18. 00 NOT VALID UNLESS RECEII
72 /•t 570 9 $
USE TAX5ales Tax Lic.
4nQZQo
TOTAL FEE $ 18.00 TM
APPROVED
CHIEF BUILDINQ\INSPECTOR,Cityof WheaYRidqe
Date Issued
CJ ~d ~7 ~
CALL 237-8944 EXT. 255
24 HOURS IN ADVANCE
FORINSPECTIONS
40CficanU 9ipnebre
DEPARTMENT 0F COMMUNIYY DEVELOPMENT M911I164S1
7500 WEST 29th AVENUE BUILDING INSPECTION DIVISION PERMIT N0.
237-6944 ExT. 255 P.O. Box sse CITY OF WHEAT RIDGE, COLO.
THIS PERMIT VAIID ONLY WHEN SIGNED 8Y THE CHIEF BUILDING INSPECTOR AND RECEIPTED BELOW.
PLI FOR MiSCELLANEOUS PERMIT
JOB ADDRESS _°1Q I OWNER ~_ff.
CONTRACTOR ADDRE55 -
ADDRESS PHONE ZIP CODE glg&~_
CITY 'r ~ZIP CODE ~ V CONTRACT PRICE $
PHONE ~ r L I C E N S E NO. ~y~
I. TYPE Ground❑ Woll❑ ProitetinQ❑ Othsr SaDFOee
2. MATERIAL Totol Squara Feet
SIGNS 3. ILLUMINATION Yea❑ No❑ Type Eletf. Parmil No.
4 SET BACK FROM PROPERTY LINE N_ S_ E_ WZone_ ADOrovad, Zone Inspeetor
1. TYPE SolidU More Than 80% OpsnL_1 Latt Thon 80% Open
MATERIAL Heipht
FENCES 3 SET BACK FROM PROPER7Y LINE N_ S_ E_ W Zons_ Apprwsd,Zons Impecta
(Specify whieA ie tront) ❑ ❑ ❑ ❑ Disopproved
r ~
i.
OTHER 2'
3.
DRAW SKETCH OR SHOW BELOW,THE FENCE,SIGN,OR OTHER STRUCTURE,GN11rv DISTANCES FROM PROPERTY LINES.
(SETBACKS OR PROJECTIONS INCLUDED) .
~
INSPECTION TICKET
STREET NAME
SHOW DISTANCES FROM THE MAIN BUILDING TUADJOINING HOUSES, STREf
DISTANCE TO PROPERTY IINES,NOT MAXIMUM OR AVERAGE DISTANC
JOB
ADDRESS
DATE: JL.L-BLDG. PERMIT#
PERMIT#
BLDG. CONTR. -
APPLICATION FOR PLUMBING; EI.ECl
THIS APPLICATION WILL BECOME A PERMtT TO PERFORM THE INDICATED' SUBCONTRACTOR ~ >ION.
PERMIT WILL EXPIRE 60 DAYS FROM DATE OF ISSUANCI _
ELECTRICAL PERMIT
STATE LiCENSE N0.
UMIPIUA4 WiRE UNDER SiZE 8 ILLEI
TEMPORARY METER
NEW SERVICE . - AMPS
CHANGE SERVICE-AMPS
LIGHTING
HEATING
POWER SUB-CIRCUITS
UTILITY (RANGE, OISPOSER, E
FIXTURES
WIRING MOTORS d CONTROLS
SIGNS
7RGNSFORMERS 9 RECTFIER
PLUMBING DATE INSP.
STATE LICENSE N0.
DISH
TYPE OF IP
INSPECTIO
REMARKS
W.R. FORM E19
I hereby acknowledqe tha1 this applica-
ti0n i5 Corrett and understand that I
eannot starf this projecf until thia appli-
Cafion in apDroved. I shall eomply with
the lawa of the Stote of Colorado and to
ihe ZoninQ Requlations and Buildinq
Code offhe Cify ot Wheof Ridqe. Any
violation of the above tarms will cause
immediate revocotion of this permit.
PERMIT FEE (J 11 V(J
USE TAX - p('~
TOTAL FEE s Jq. gD
APPROVED
DISAPPROVED
CHIEF BUILDING NSPECTOR,City of Wheai Ridqe
Date Issued -A p- 2~ ~ A 01 /
!0 el/
1ll,RI
3996v
CAL1237-8944 EXT.255
24 HOURS IN ADVANCE
FORINSPECTIONS
c